Powered by Deep Web Technologies
Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Annual Energy Outlook Retrospective Review  

Reports and Publications (EIA)

The Annual Energy Outlook Retrospective Review provides a yearly comparison between realized energy outcomes and the Reference case projections included in previous Annual Energy Outlooks (AEO) beginning with 1982. This edition of the report adds the AEO 2012 projections and updates the historical data to incorporate the latest data revisions.

2014-01-01T23:59:59.000Z

2

DOE Retrospective Review Plan Report  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOEDOEAVAILABLEDepartmentProgram RequirementsReport

3

Notice of Availability of Preliminary Plan for Retrospective...  

Energy Savers [EERE]

Analysis of Existing Rules Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Through this notice, the Department of Energy (DOE) announces...

4

Independent Scientific Review Panel Retrospective Report 1997 2005  

E-Print Network [OSTI]

Independent Scientific Review Panel Retrospective Report 1997 ­ 2005 ISRP 2005-14 August 31, 2005 graphics used in this report. #12;ISRP Retrospective Report 1997 - 2005 Executive Summary.....................................................................

5

Department of Energy Retrospective Plan Update as of February 2015 |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealing WithDevelopmentReport and AgencyResponse to

6

Sealed source peer review plan  

SciTech Connect (OSTI)

Sealed sources are known quantities of radioactive materials that have been encapsulated in quantities that produce known radiation fields. Sealed sources have multiple uses ranging from instrument calibration sources to sources that produce radiation fields for experimental applications. The Off-Site Source Recovery (OSR) Project at Los Alamos National Laboratory (LANL), created in 1999, under the direction of the Waste Management Division of the U.S. Department of Energy (DOE) Albuquerque has been assigned the responsibility to recover and manage excess and unwanted radioactive sealed sources from the public and private sector. LANL intends to ship drums containing qualified sealed sources to the Waste Isolation Pilot Plant (WIPP) for disposal. Prior to shipping, these drums must be characterized with respect to radiological content and other parameters. The U. S. Environmental Protection Agency (EPA) requires that ten radionulcides be quantified and reported for every container of waste to be disposed in the WIPP. The methods traditionally approved by the EPA include non-destructive assay (NDA) in accordance with Appendix A of the Contact-Handled Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (DOE, 2002) (CH WAC). However, because of the nature and pedigree of historical records for sealed sources and the technical infeasibility of performing NDA on these sources, LANL proposes to characterize the content of these waste drums using qualified existing radiological data in lieu of direct measurement. This plan describes the process and documentation requirements for the use of the peer review process to qualify existing data for sealed radiological sources in lieu of perfonning radioassay. The peer review process will be performed in accordance with criteria provided in 40 CFR {section} 194.22 which specifies the use of the NUREG 1297 guidelines. The plan defines the management approach, resources, schedule, and technical requirements for the subject peer review.

Feldman, Alexander [Los Alamos National Laboratory; Leonard, Lee [RETIRED; Burns, Ron [CONTRACTOR

2009-01-01T23:59:59.000Z

7

DOE Retrospective Review Plan and Burden Reduction Report  

Energy Savers [EERE]

August 2014 Newly Added Actions Agency Sub-agency RIN OMB Control Number Title of Initiative RulelCR Brief Description Actual or Target Completion Date Anticipated savings in...

8

DOE Retrospective Review Plan and Burden Reduction Report  

Broader source: Energy.gov (indexed) [DOE]

a negotiated rulemaking, DOE seeks to achieve a consensus standard that brings all interest groups together and achieves the appropriate balance between energy savings and...

9

DOE Retrospective Review Plan Report May 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy SecretaryEnergy 2. The2013.

10

DOE Retrospective Review Plan and Burden Reduction Report - December 18,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy SecretaryEnergy 2. The2013.2012 |

11

DOE Retrospective Review Plan and Burden Reduction Report | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy SecretaryEnergy 2.

12

DOE Retrospective Review Plan and Burden Reduction Report  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOEDOEAVAILABLEDepartmentProgram

13

DOE Retrospective Review Plan and Burden Reduction Report  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOEDOEAVAILABLEDepartmentProgramJanuary 2014 Agency/

14

DOE Retrospective Review Plan and Burden Reduction Report  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOEDOEAVAILABLEDepartmentProgramJanuary 2014February

15

DOE Retrospective Review Plan and Burden Reduction Report  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramof Energy ClimateConditionersResponseAugust 2014

16

2008 Residential2008 Residential Energy Plan ReviewEnergy Plan Reviewe gy la eviewe gy la eview  

E-Print Network [OSTI]

2008 Residential2008 Residential Energy Plan ReviewEnergy Plan Reviewe gy la eviewe gy la eview #12;2008 Residential Energy Plan2008 Residential Energy Plan Review ChecklistReview Checklist Simplification ChecklistsOther Available Checklists 2005 and 2008 Residential Energy Documentation2005 and 2008 Residential

17

Standard Review Plan for In Situ Leach Uranium  

E-Print Network [OSTI]

NUREG-1569 Standard Review Plan for In Situ Leach Uranium Extraction License Applications Final Washington, DC 20555-0001 #12;NUREG-1569 Standard Review Plan for In Situ Leach Uranium Extraction License OF A STANDARD REVIEW PLAN (NUREG­1569) FOR STAFF REVIEWS FOR IN SITU LEACH URANIUM EXTRACTION LICENSE

18

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network [OSTI]

a detailed cost estimate. F. PROJECT PLANNING GUIDE (PPG): This document is required for all State fundedCAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised June 2011) ___________________________________________________________________________________________ I. INTRODUCTION An effective major capital planning and review process will: Encourage appropriate

California at Santa Barbara, University of

19

Methylene Chloride Management Plan Review and Approval Authority  

E-Print Network [OSTI]

-8172 (Medical Consultation and Evaluation) Facilities Management Work Control Center (301) 405-2222 (RepairMETHYLENE CHLORIDE MANAGEMENT PLAN #12;#12;Methylene Chloride Management Plan Review and Approval Date #12;ii Methylene Chloride Management Plan #12;Methylene Chloride Management Plan Table of Contents

Rubloff, Gary W.

20

Application Review Evaluation Workforce Planning | 408-924-2250  

E-Print Network [OSTI]

Application Review Evaluation Workforce Planning | 408-924-2250 HR: 5/2/2013 Instructions: Fill out one form for each application referred by Workforce Planning. Use the pre-approved screening criteria

Eirinaki, Magdalini

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Retrospective Estimation of the Quality of Intensity-Modulated Radiotherapy Plans for Lung Cancer  

E-Print Network [OSTI]

This study estimated the planning quality of intensity-modulated radiotherapy in 42 lung cancer cases to provide preliminary data for the development of a planning quality assurance algorithm. Organs in or near the thoracic cavity (ipsilateral lung, contralateral lung, heart, liver, esophagus, spinal cord, and bronchus) were selected as organs at risk (OARs). Radiotherapy plans were compared using the conformity index (CI), coverage index (CVI), and homogeneity index (HI) of the planning target volume (PTV), OAR-PTV distance and OAR-PTV overlap volume, and the V10Gy, V20Gy, and equivalent uniform dose (EUD) of the OARs. The CI, CVI, and HI of the PTV were 0.54 - 0.89 , 0.90 - 1.00 , and 0.11 - 0.41, respectively. The mean EUDs (V10Gy, V20Gy) of the ipsilateral lung, contralateral lung, esophagus, cord, liver, heart, and bronchus were 8.07 Gy (28.06, 13.17), 2.59 Gy (6.53, 1.18), 7.02 Gy (26.17, 12.32), 3.56 Gy (13.56, 4.48), 0.72 Gy (2.15, 0.91), 5.14 Gy (19.68, 8.62), and 10.56 Gy (36.08, 19.79), respectivel...

Koo, Jihye; Chung, Weon Kuu; Kim, Dong Wook

2015-01-01T23:59:59.000Z

22

Climate Action Planning: A Review of Best Practices, Key Elements...  

Open Energy Info (EERE)

Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment Jump to:...

23

Standard Review Plan Preparation for Facility Operations Strengthening...  

Office of Environmental Management (EM)

Planning and Conducting Readiness Reviews DOE O 422.1, Admin Chg 1, Conduct of Operations, June 2013 DOE O 426.2, Personnel Selection, Training, Qualification, and...

24

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

Independent Scientific Review Panel for the Northwest Power Planning Council 851 SW 6th Avenue, Suite 1100 Portland, Oregon 97204 isrp@nwppc.org Review of Idaho Supplementation Studies (IDFG 2003-8 May 22, 2003 #12;ISRP 2003-8 ISS Review i ISRP Review of Idaho Supplementation Studies Contents

25

The American Board of Radiology Holman Research Pathway: 10-Year Retrospective Review of the Program and Participant Performance  

SciTech Connect (OSTI)

Introduction: In 1999, the American Board of Radiology (ABR) implemented an innovative training program track in diagnostic radiology (DR) and radiation oncology (RO) designed to stimulate development of a cadre of future academic researchers and educators in the 2 disciplines. The program was designated the Holman Research Pathway (HRP). An in-depth retrospective review of initial certification examination performance, post-training career choices, and academic productivity has not been written. This report represents a 10-year retrospective review of post-training performance of a cohort of trainees who have had sufficient time to complete their training and initial certification process and to enter practice. Methods and Materials: All pertinent proceedings of the ABR and Accreditation Council for Graduate Medical Education (ACGME) Residency Review Committees for DR and RO between 1997 and May 2011 were reviewed. Thirty-four HRP candidates who fulfilled the established evaluation criteria were identified, and their ABR data files were analyzed regarding performance on the qualifying and certifying examinations. All candidates were contacted directly to obtain a current curriculum vitae. Results: Twenty candidates in RO and 14 candidates in DR were identifiable for review. All candidates attained initial certification. At the time of analysis, 23 of 33 (66.6%) candidates were employed in full-time academic practice (1 DR candidate remained in a fellowship and was not evaluated regarding employment status). Fifteen of 20 (75%) RO candidates were in faculty positions compared with 7 of 13 (53.8%) DR trainees. Additional academic productivity metrics are reported. Conclusions: A high percentage of HRP trainees remained in academic practice and demonstrated significant academic productivity as measured by manuscript authorship and research support. Additional time and observation will be needed to determine whether these findings will be sustained by past, current, and future HRP trainees.

Wallner, Paul E., E-mail: pwallner@theabr.org [21st Century Oncology, LLC, Fort Myers, Florida, and American Board of Radiology, Tucson, Arizona (United States); Ang, K. Kian [University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Zietman, Anthony L. [Harvard Medical School and Massachusetts General Hospital, Boston, Massachusetts (United States)] [Harvard Medical School and Massachusetts General Hospital, Boston, Massachusetts (United States); Harris, Jay R. [Harvard Medical School and Dana-Farber Cancer Institute, Boston, Massachusetts (United States)] [Harvard Medical School and Dana-Farber Cancer Institute, Boston, Massachusetts (United States); Ibbott, Geoffrey S. [University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Mahoney, Mary C. [University of Cincinnati Medical Center, Cincinnati, Ohio (United States)] [University of Cincinnati Medical Center, Cincinnati, Ohio (United States); Mezwa, Duane G. [Oakland University William Beaumont School of Medicine, Royal Oaks, Michigan (United States)] [Oakland University William Beaumont School of Medicine, Royal Oaks, Michigan (United States); Wilson, Lynn D. [Yale University School of Medicine, New Haven, Connecticut (United States)] [Yale University School of Medicine, New Haven, Connecticut (United States); Becker, Gary J. [American Board of Radiology, Tucson, Arizona (United States)] [American Board of Radiology, Tucson, Arizona (United States)

2013-01-01T23:59:59.000Z

26

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

publications.html PG&E. 2007a. WECC Regional PlanningCalifornia Electric: WECC Regional Planning Project,Presentation January 23,2008 WECC Regional Planning Review

Mills, Andrew D.

2009-01-01T23:59:59.000Z

27

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

Independent Scientific Review Panel for the Northwest Power Planning Council Preliminary Review to ISRP comments requested Report Page # 24001 Lake Pend Oreille Predation Research Idaho Fish and Game No and conserve high priority bull and westslope cutthroat trout habitat in Trestle Creek. Idaho Department

28

Caries Incidence in Healthy Siblings of Children with Autism Spectrum Disorder: A Retrospective Chart Review  

E-Print Network [OSTI]

dental practice in Coppell, Texas that treats autistic children and their siblings. Forty-five charts of healthy siblings of children with ASD and 43 charts of age-matched, healthy-healthy sibling pairs were reviewed. The number of decayed, missing...

Zarrabi, Sameen

2013-12-10T23:59:59.000Z

29

C-Division annual review and operating plan, August 1990  

SciTech Connect (OSTI)

The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

Morse, N.R.

1990-11-01T23:59:59.000Z

30

DOE Retrospective Review Plan and Burden Reduction Report July 29, 2013 |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy SecretaryEnergy 2. The2013.2012

31

Standard Review Plan | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the AmericasDOE-STD-3020-2005Code of Record Standard Review

32

EXECUTIVE SUMMARY A Review of Water Conservation Planning for the  

E-Print Network [OSTI]

to maintain critical water flows for downstream ecosystems, the Florida Department of Environmental Protection by incorporating the full benefits of water recycling and reuse. Analysis underestimates economic valueEXECUTIVE SUMMARY A Review of Water Conservation Planning for the Atlanta, Georgia Region (August

33

Standard review plan for dry cask storage systems. Final report  

SciTech Connect (OSTI)

The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

NONE

1997-01-01T23:59:59.000Z

34

Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2  

SciTech Connect (OSTI)

The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

Not Available

1993-12-01T23:59:59.000Z

35

Common Planning, Budget, and Review Terms Office of Planning, Budget, and Review, LM132 1 of 5 updated 11-7-07  

E-Print Network [OSTI]

Common Planning, Budget, and Review Terms Office of Planning, Budget, and Review, LM132 1 of 5 updated 11-7-07 Adopted Budget the Board approved budget for any given fiscal year; the budget at the beginning of the fiscal year Auxiliary Budgets/Activity - budgets and associated activity that provide self

Galles, David

36

ISRP 2005-14: Retrospective Report -Executive Summary ISRP Retrospective Report 1997 -2005  

E-Print Network [OSTI]

ISRP 2005-14: Retrospective Report - Executive Summary ISRP Retrospective Report 1997 - 2005 major sections. The first section discusses the ISRP review process from 1997 through 2005 and its

37

ISRP 2005-14: Retrospective Report -Appendix Appendix. The Evolution of Scientific Review in the Fish and  

E-Print Network [OSTI]

to include peer review in the operating policies of federal funding agencies and the need for other reforms

38

Standard review plan for reviewing safety analysis reports for dry metallic spent fuel storage casks  

SciTech Connect (OSTI)

The Cask Standard Review Plan (CSRP) has been prepared as guidance to be used in the review of Cask Safety Analysis Reports (CSARs) for storage packages. The principal purpose of the CSRP is to assure the quality and uniformity of storage cask reviews and to present a well-defined base from which to evaluate proposed changes in the scope and requirements of reviews. The CSRP also sets forth solutions and approaches determined to be acceptable in the past by the NRC staff in dealing with a specific safety issue or safety-related design area. These solutions and approaches are presented in this form so that reviewers can take consistent and well-understood positions as the same safety issues arise in future cases. An applicant submitting a CSAR does not have to follow the solutions or approaches presented in the CSRP. However, applicants should recognize that the NRC staff has spent substantial time and effort in reviewing and developing their positions for the issues. A corresponding amount of time and effort will probably be required to review and accept new or different solutions and approaches.

Not Available

1988-01-01T23:59:59.000Z

39

Review of the Waste Isolation Pilot Plant Work Planning and Control...  

Office of Environmental Management (EM)

Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of...

40

EXTERNAL PEER REVIEW REPORT Sabine-Neches Waterway (SNWW) Channel Improvement Plan (CIP) Draft Feasibility  

E-Print Network [OSTI]

FINAL EXTERNAL PEER REVIEW REPORT for Sabine-Neches Waterway (SNWW) Channel Improvement Plan (CIP Review Comments from the SNWW CIP Feasibility Study and DEIS External Peer Review Panel................ 3 Table 3. External Peer Reviewer Panel for the SNWW CIP Feasibility Study and DEIS: Technical

US Army Corps of Engineers

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Implementation plan for WRAP Module 1 operational readiness review  

SciTech Connect (OSTI)

The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

Irons, L.G.

1994-11-04T23:59:59.000Z

42

Site Visit Report - Independent Oversight Review of Work Planning...  

Broader source: Energy.gov (indexed) [DOE]

representatives participate in daily work planning meetings; and instituting Conduct of Operations training for front line managers and Facility Managers. PRS also began...

43

Venus Technology Plan: 2014 (Draft for Community Review--March 12, 2014)  

E-Print Network [OSTI]

Venus Technology Plan: 2014 (Draft for Community Review--March 12, 2014) #12; ii Venus Technology Plan At the last VEXAG meeting in November 2013, it was resolved to update the scientific as Planetary Decadal Survey priorities, and (3) develop a white paper on technologies for Venus missions. Here

Rathbun, Julie A.

44

Comparisons of ANSI standards cited in the NRC standard review plan, NUREG-0800 and related documents  

SciTech Connect (OSTI)

This report provides the results of comparisons of the cited and latest versions of ANSI standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.

Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

45

Comparisons of ASTM standards cited in the NRC standard review plan, NUREG-0800 and related documents  

SciTech Connect (OSTI)

This report provides the results of comparisons of the cited and latest versions of ASTM standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.

Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Pawlowski, R.A.; Spiesman, J.B.

1995-10-01T23:59:59.000Z

46

Review of Commercial Grade Dedication Plans for the Safety Instrumente...  

Broader source: Energy.gov (indexed) [DOE]

Review Board William Eckroade John Boulden Thomas Staker Michael Kilpatrick George Armstrong Al Gibson Robert Nelson Independent Oversight Site Lead for SRS Phil Aiken...

47

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

of NMFS Proposal "Evaluate Hatchery Reform Principles" Dear Mr. Cassidy: This letter constitutes the ISRP's review of the revised National Marine Fisheries Service's proposal "Evaluate Hatchery Reform Principles

48

Review of the Headquarters Facilities Emergency Response Plans  

Energy Savers [EERE]

this review have comprehensive fire alarm systems that are automatically activated by heat, smoke, or fire suppression system activity or by manual pull stations. Manual pull...

49

Office of Enterprise Assessments Targeted Review of Work Planning...  

Energy Savers [EERE]

noted previously, the WRPS technical procedure process provides a comprehensive system for developing, reviewing, approving, using, and modifying procedures. This process...

50

REVIEW ARTICLE Models to support cropping plan and crop rotation decisions.  

E-Print Network [OSTI]

. To support farmers and efficiently allocate scarce resources, decision support models are developed. DecisionREVIEW ARTICLE Models to support cropping plan and crop rotation decisions. A review Jérôme Dury /Published online: 8 July 2011 # INRA and Springer Science+Business Media B.V. 2011 Abstract Farmers must

Paris-Sud XI, Université de

51

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an indepen dent

52

Nuclear Waste Technical Review Board Strategic Plan for FY 2001-2006  

E-Print Network [OSTI]

Appendix G Nuclear Waste Technical Review Board Strategic Plan for FY 2001-2006 (Revised March 2001) Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established as an independent agency of the United States Government on December 22, 1987, in the Nuclear Waste Policy Amendments Act

53

U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established of Energy Mission The Board's mission, established in the Nuclear Waste Policy Amendments Act (NWPAA

54

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an independent

55

Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)  

SciTech Connect (OSTI)

Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

Cooper, W.E.

2000-09-29T23:59:59.000Z

56

Nuclear Waste Technical Review Board Strategic Plan FY 20082013  

E-Print Network [OSTI]

on compliance activities, in conduct- ing its evaluation, the Board will encourage DOE through its science its review of DOE activities into three technical areas: preclosure operations, including surface-facility design and operations and the transport of spent nuclear fuel and high-level radioactive waste from

57

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunning jobsOPERATING PLAN 573.1-207

58

Reviewing Measurement and Verification Plans for Federal ESPC Projects  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l LPROJECTS IN RENEWABLEOperated inFebruaryReviewing Measurement &

59

Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiments)  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

Cooper, W.E.

2000-09-29T23:59:59.000Z

60

Plan of Action: JASPER Management Prestart Review (Surrogate Material Experiment)  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory (LLNL) Joint Actinide Shock Physics Experimental Research (JASPER) Facility is being developed at the Nevada Test Site (NTS) to conduct shock physics experiments on special nuclear material and other actinide materials. JASPER will use a two-stage, light-gas gun to shoot projectiles at actinide targets. Projectile velocities will range from 1 to 8 km/s, inducing pressures in the target material up to 6 Mbar. The JASPER gas gun has been designed to match the critical dimensions of the two-stage, light-gas gun in Building 341 of LLNL. The goal in copying the LLNL gun design is to take advantage of the extensive ballistics database that exists and to minimize the effort spent on gun characterization in the initial facility start-up. A siting study conducted by an inter-Laboratory team identified Able Site in Area 27 of the NTS as the best location for the JASPER gas gun. Able Site consists of three major buildings that had previously been used to support the nuclear test program. In April 1999, Able Site was decommissioned as a Nuclear Explosive Assembly Facility and turned back to the DOE for other uses. Construction and facility modifications at Able Site to support the JASPER project started in April 1999 and were completed in September 1999. The gas gun and the secondary confinement chamber (SCC) were installed in early 2000. During the year, all facility and operational systems were brought on line. Initial system integration demonstrations were completed in September 2000. The facility is anticipated to be operational by August 2001, and the expected life cycle for the facility is 10 years. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. The review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before the formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating SNM into future experiments, the team will convene again as part of the process of authorizing those activities.

Cooper, W E

2000-12-05T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Environmental Assessment/Regulatory Impact Review AMENDMENT 45 TO THE FISHERY MANAGEMENT PLAN  

E-Print Network [OSTI]

Environmental Assessment/Regulatory Impact Review FOR AMENDMENT 45 TO THE FISHERY MANAGEMENT PLAN it would conflict with the Bering Sea non-roe season. At its January 1996 meeting, the Council considered/C Regulatory Areas must be made. Amendment 19 to the FMP, implemented as a measure to prevent roe stripping

62

Stock Take Summary 2009 A Review of Progress Against the Manchester 2015 Strategic Plan  

E-Print Network [OSTI]

Stock Take Summary 2009 A Review of Progress Against the Manchester 2015 Strategic Plan #12;The 2009 Stock Take Report provides a detailed appraisal of progress against the nine Strategic Goals of the University's performance over the previous 12 months. In relation to accountability, each Stock Take Report

Heil, Matthias

63

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20032008  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2003­2008 Statement of the Chairman The Nuclear Waste Policy Amendments Act of 1987 directed the U.S. Department as the location of a permanent repository for dis posing of spent nuclear fuel and high-level radioactive waste

64

Letter and Sampling Plan: Soils Review Sampling Plan for the Southeast Drainage and Sampling Notification.  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$ EGcG ENERGYELIkNATIONHEALXH:LTS Plan WorkshopI9 I

65

Technical issues related to NUREG 0800, Chapter 18: Human Factors Engineering/Standard Review Plan  

SciTech Connect (OSTI)

The revision of Chapter 18 of NUREG 0800, Human Factors Engineering Standard Review Plan (SRP) will be based on SECY 82-111 and guidance contained in NUREG 0700, NUREG 0801 and NUREG 0835, plus other references. In conducting field reviews of control rooms, the NRC has identified technical issues which can be used to enhance the development of the revised version of NUREG 0800, and to establish priorities among the list of possible Branch Technical Positions (BTP) in NUREG 0800, Rev. 0, Table 18.0-2. This report is a compilation of comments and suggestions from the people who used NUREG 0700 in the Control Room field reviews. This information was used to establish possible BTP topic priorities so that the most important BTPs could be issued first. The comments and suggestions are included for HFEB review in conjunction with the table of priorities.

Savage, J.W.

1982-11-05T23:59:59.000Z

66

Review of the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education and State Agencies  

E-Print Network [OSTI]

This report provides a concise review of the Energy Systems Laboratory's experience in evaluating the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education & State Agencies (Texas Health...

Claridge, D. E.; Haberl, J. S.; Yazdani, B. L.; Zilbershtein, G.

2013-01-01T23:59:59.000Z

67

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 2177 Review of Reactive Power Planning: Objectives,  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 2177 Review of Reactive Power Member, IEEE, and Leon M. Tolbert, Senior Member, IEEE Abstract--The key of reactive power planning (RPP), or Var planning, is the optimal allocation of reactive power sources con- sidering location and size

Tolbert, Leon M.

68

Comparisons of ANS, ASME, AWS, and NFPA standards cited in the NRC standard review plan, NUREG-0800, and related documents  

SciTech Connect (OSTI)

This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC`s Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.

Ankrum, A.R.; Bohlander, K.L.; Gilbert, E.R.; Spiesman, J.B. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

69

File:Temporary storage plan review check list.pdf | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf Jump to: navigation,storage plan review check list.pdf Jump

70

Review of Jamaica Public Service Company, Ltd. least-cost expansion plan.  

SciTech Connect (OSTI)

Argonne National Laboratory has been asked to review the least-cost expansion plan (LCEP) of the Jamaica Public Service Company, Ltd. (JPSCo). The material that has been initially provided to Argonne included: (1) An electronic copy of the data and results from JPSCo's running the WASP electric system expansion planning model, (2) Approximately 20 pages of a document 'JPSCo Generation Expansion Plan', marked 'DRAFT 002', date unknown, and (3) The report 'JPSCo Least Cost Generation Expansion Plans, (1999-2009)', January 1999. It was noticed that the 20 pages from the 'DRAFT 002' document were different from the January 1999 report. An explanation was provided to Argonne that the excerpt was from an earlier draft and that the review should focus on the January 1999 report. Further, the electronic copy of the WASP case did not correspond to either the January 1999 report or to the 20-page excerpt. Again, the reason for these discrepancies was that the WASP case provided to Argonne was an earlier case and not the final one that was presented in the report. Based on the review of the available material, Argonne experts have prepared and submitted to the National Investment Bank of Jamaica (NIBJ) a preliminary draft report containing the initial findings, comments, questions and observations. As many of the comments and questions raised in the preliminary review needed to be discussed with the appropriate staff of JPSCo and other Jamaican experts, a 3-day mission to Jamaica was carried out by one Argonne expert (V. Koritarov) in the period July 20-23, 1999. Besides JPSCo experts, the discussions and the review of the LCEP during the mission included several experts from NIBJ, Ministry of Energy, and the Petroleum Corporation of Jamaica. Mr. Koritarov also worked with the JPSCo technical staff to reconstruct the WASP base case that was used as a basis for the January 1999 report. The first step was to verify that the results obtained after the resimulation of this case were identical to those presented in the January 1999 report. Then, in the next step, the Argonne expert and JPSCo team reviewed this case in detail and performed certain modifications and improvements of data where necessary. These modifications and data adjustments resulted in a new base case that served as a basis for further review and for the sensitivity analyses. Several sensitivity analyses were performed together with JPSCo experts and the results were discussed with the JPSCo management and other Jamaican experts at the end of the mission. Additional sensitivity analyses, as well as the cases for high and low load forecasts, were conducted by Mr. Koritarov after returning from Jamaica. The main findings of the review and issues that have been discussed with the Jamaican team can be summarized.

Koritarov, V.; Buehring, W.; Cirillo, R.; Decision and Information Sciences

2008-02-28T23:59:59.000Z

71

AHAM Retrospective Preliminary Plan | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014DepartmentI325DOE Verification Test

72

NASA -RETROSPECTIVE PLAN PROGRESS January 2013  

E-Print Network [OSTI]

of Utility Services, part 1846, Quality Assurances, part 1851, Use of Government Sources by Contractors, committees, boards, and panels established to govern and support decision making. General information about disadvantaged business, HUBZone small business, women-owned small business concerns, veteran-owned small

Waliser, Duane E.

73

Hipparcos: a Retrospective  

E-Print Network [OSTI]

The Hipparcos satellite was launched in 1989. It was the first, and remains to date the only, attempt at performing large-scale astrometric measurements from space. Hipparcos marked a fundamentally new approach to the field of astrometry, revolutionising our knowledge of the positions, distances, and space motions of the stars in the solar neighbourhood. In this retrospective, I look back at the processes which led to the mission's acceptance, provide a short summary of the underlying measurement principles and the experiment's scientific achievements, and a conclude with a brief summary of its principal legacy - the Gaia mission.

Perryman, Michael

2011-01-01T23:59:59.000Z

74

Electron Paramagnetic Resonance Retrospective Dosimetry  

SciTech Connect (OSTI)

Necessity for, principles of, and general concepts of the electron paramagnetic resonance (EPR) retrospective dosimetry are presented. Also presented and given in details are examples of EPR retrospective dosimetry applications in tooth enamel, bone, and fingernails with focus on general approaches for solving technical and methodological problems. Advantages, drawbacks, and possible future developments are discussed and an extensive bibliography on EPR retrospective dosimetry is provided.

Romanyukha, Alex [Naval Dosimetry Center, 8901 Wisconsin Ave., Bethesda, MD, 20889 (United States); Trompier, Francois [Institute for Radiological Protection and Nuclear Safety, Fontenay-aux-Roses, France 92262 (France)

2011-05-05T23:59:59.000Z

75

ISRP Retrospective Report:ISRP Retrospective Report: 19971997 20052005  

E-Print Network [OSTI]

.D., NPCC #12;ISRP RetrospectiveISRP Retrospective ·· Presents an overview of ISRP activities from 1997 toPresents an overview of ISRP activities from 1997 to 2005 and evaluates the cumulative effect of our2005 and evaluates

76

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

SciTech Connect (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

77

Road-corridor planning in the EIA procedure in Spain. A review of case studies  

SciTech Connect (OSTI)

The assessment of different alternatives in road-corridor planning must be based on a number of well-defined territorial variables that serve as decision making criteria, and this requires a high-quality preliminary environmental assessment study. In Spain the formal specifications for the technical requirements stipulate the constraints that must be considered in the early stages of defining road corridors, but not how they should be analyzed and ranked. As part of the feasibility study of a new road definition, the most common methodology is to establish different levels of Territorial Carrying Capacity (TCC) in the study area in order to summarize the territorial variables on thematic maps and to ease the tracing process of road-corridor layout alternatives. This paper explores the variables used in 22 road-construction projects conducted by the Ministry of Public Works that were subject to the Spanish EIA regulation and published between 2006 and 2008. The aim was to evaluate the quality of the methods applied and the homogeneity and suitability of the variables used for defining the TCC. The variables were clustered into physical, environmental, land-use and cultural constraints for the purpose of comparing the TCC values assigned in the studies reviewed. We found the average quality of the studies to be generally acceptable in terms of the justification of the methodology, the weighting and classification of the variables, and the creation of a synthesis map. Nevertheless, the methods for assessing the TCC are not sufficiently standardized; there is a lack of uniformity in the cartographic information sources and methodologies for the TCC valuation. -- Highlights: We explore 22 road-corridor planning studies subjected to the Spanish EIA regulation. We analyze the variables selected for defining territorial carrying capacity. The quality of the studies is acceptable (methodology, variable weighting, mapping). There is heterogeneity in the methods for territorial carrying capacity valuation.

Loro, Manuel, E-mail: manuel.loro@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain) [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Arce, Rosa M., E-mail: rosa.arce.ruiz@upm.es [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Ortega, Emilio, E-mail: e.ortega@upm.es [Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain) [Transport Research Centre (TRANSyT-UPM) Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s/n, 28040 Madrid (Spain); Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s/n, 28040 Madrid (Spain); Department of Construction and Rural Roads, Forestry Engineering School, Universidad Politcnica de Madrid, Ciudad Universitaria s/n, 28040 Madrid (Spain); and others

2014-01-15T23:59:59.000Z

78

A Retrospective Review of Supratherapeutic Modafinil Exposures  

E-Print Network [OSTI]

as a heart rate >100 bpm, and hypertension was defined as aand ranged from 101 to 168 bpm. Hypertension occurred in sixrevealed a heart rate of 64 bpm and blood pressure of 137/78

Carstairs, Shaun D.; Urquhart, Andrew; Hoffman, Justin; Clark, Richard F.; Cantrell, F. Lee

2010-01-01T23:59:59.000Z

79

Annual Energy Outlook Retrospective Review - Energy Information  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperativeA2. World liquids consumption by9 U.S. Energy Information6

80

Plan  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH LAS VEGAS POLICESpecialPiprocess or

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

82

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2007. Inclusion of Wind in the MISO Transmission Expansionhttp://www.jcspstudy.org/ Midwest ISO (MISO). 2007. Midwest+Planning Midwest ISO (MISO). 2003. Midwest Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

83

Status Update on Action 2c: Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Bradley K. Davy, Director, Office of Worker Safety and Health Assistance, HS. Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity- Level Work Planning and Control. DOE CRAD Development Approach.

84

Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 1  

SciTech Connect (OSTI)

Performance-Based Ratemaking (PBR) is a form of utility regulation that strengthens the financial incentives to lower rates, lower costs, or improve nonprice performance relative traditional regulation, which the authors call cost-of-service, rate-of-return (COS/ROR) regulation. Although the electric utility industry has considerable experience with incentive mechanisms that target specific areas of performance, implementation of mechanisms that cover a comprehensive set of utility costs or services is relatively rare. In recent years, interest in PBR has increased as a result of growing dissatisfaction with COS/ROR and as a result of economic and technological trends that are leading to more competition in certain segments of the electricity industry. In addition, incentive regulation has been used with some success in other public utility industries, most notably telecommunications in the US and telecommunications, energy, and water in the United Kingdom. In this report, the authors analyze comprehensive PBR mechanisms for electric utilities in four ways: (1) they describe different types of PBR mechanisms, (2) they review a sample of actual PBR plans, (3) they consider the interaction of PBR and utility-funded energy efficiency programs, and (4) they examine how PBR interacts with electric utility resource planning and industry restructuring. The report should be of interest to technical staff of utilities and regulatory commissions that are actively considering or designing PBR mechanisms. 16 figs., 17 tabs.

Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.; Hill, L.J. [Lawrence Berkeley Lab., CA (United States). Energy and Environment Div.]|[Oak Ridge National Lab., TN (United States). Energy Div.

1995-11-01T23:59:59.000Z

85

Retrospective on Aurora Hari Balakrishnan  

E-Print Network [OSTI]

Retrospective on Aurora Hari Balakrishnan± , Magdalena Balazinska± , Don Carney§ , Uur ?etintemel the key lessons we learned throughout the design and implementation of the Aurora stream processing engine. For the past two years, we have built five stream-based applications using Aurora. We first describe in detail

Cherniack, Mitch

86

Uncertainty and Sensitivity Analyses Plan. Draft for Peer Review: Hanford Environmental Dose Reconstruction Project  

SciTech Connect (OSTI)

Hanford Environmental Dose Reconstruction (HEDR) Project staff are developing mathematical models to be used to estimate the radiation dose that individuals may have received as a result of emissions since 1944 from the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. An uncertainty and sensitivity analyses plan is essential to understand and interpret the predictions from these mathematical models. This is especially true in the case of the HEDR models where the values of many parameters are unknown. This plan gives a thorough documentation of the uncertainty and hierarchical sensitivity analysis methods recommended for use on all HEDR mathematical models. The documentation includes both technical definitions and examples. In addition, an extensive demonstration of the uncertainty and sensitivity analysis process is provided using actual results from the Hanford Environmental Dose Reconstruction Integrated Codes (HEDRIC). This demonstration shows how the approaches used in the recommended plan can be adapted for all dose predictions in the HEDR Project.

Simpson, J.C.; Ramsdell, J.V. Jr.

1993-04-01T23:59:59.000Z

87

Comparative Review of a Dozen National Energy Plans: Focus on Renewable and Efficient Energy  

SciTech Connect (OSTI)

Dozens of groups have submitted energy, environmental, and economic recovery plans for consideration by the Obama administration and the 111th Congress. This report provides a comparative analysis of 12 national proposals, focusing especially on energy efficiency (EE) and renewable energy (RE) market and policy issues.

Logan, J.; James, T. L.

2009-03-01T23:59:59.000Z

88

Geothermal Program Review XII: proceedings. Geothermal Energy and the President's Climate Change Action Plan  

SciTech Connect (OSTI)

Geothermal Program Review XII, sponsored by the Geothermal Division of US Department of Energy, was held April 25--28, 1994, in San Francisco, California. This annual conference is designed to promote effective technology transfer by bringing together DOE-sponsored researchers; utility representatives; geothermal energy developers; suppliers of geothermal goods and services; representatives from federal, state, and local agencies; and others with an interest in geothermal energy. In-depth reviews of the latest technological advancements and research results are presented during the conference with emphasis on those topics considered to have the greatest potential to impact the near-term commercial development of geothermal energy.

Not Available

1994-12-31T23:59:59.000Z

89

LIST OF DECOMMISSIONING LESSONS-LEARNED IN SUPPORT OF THE DEVELOPMENT OF A STANDARD REVIEW PLAN FOR NEW REACTOR LICENSING  

E-Print Network [OSTI]

Staff in the Division of New Reactor Licensing (DNRL) requested assistance from the Division of Waste Management and Environmental Protection (DWMEP) in the development of a standard review plan (SRP) for the licensing of new reactor facilities. Specifically, DNRL staff requested a list of high-level decommissioning lessons-learned that new applicants for a reactor license should address in order to minimize, to the extent practicable, contamination of the facility and the environment, facilitate eventual decommissioning, and minimize, to the extent practicable, the generation of radioactive waste. DWMEP staff met with your staff several times to discuss and clarify the requested input. This requested information is provided in Enclosure 1. I would like to bring to your attention other sources of decommissioning lessons-learned. The list of lessons-learned provided in Enclosure 1 is a subset of a much larger set of decommissioning lessons-learned. DWMEP developed the list in Enclosure 1 by reviewing the lessons-learned described in other documents (Enclosure 2) and selecting those it felt were most significant, based on DWMEP decommissioning experience. Additionally, the Electric Power Research Institute (EPRI) has developed decommissioning lessons-learned. DWMEP has not reviewed those lessons-learned because they are considered proprietary information by EPRI. DWMEP staff also developed a comprehensive bibliography of documents containing decommissioning lessons-learned. The bibliography is posted on the Nuclear Regulatory Commissions public website. CONTACT: Rafael L. Rodriguez, NMSS/DWMEP

Memorandum To; David B. Matthews; Elmo E. Collins

2006-01-01T23:59:59.000Z

90

Review of Utility Resource Plans in the West: Resource Strategies for a  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReplyofRetiring ProcurementReturnReview of

91

Review: ??????? ????: ????????????????? ??????? ?????? ?. ?. ????????? ?????. ?????? ?? ??????? ? ??????????? ??????????  

E-Print Network [OSTI]

145 Ocene, zapiski, poro?ila Reviews, Notes, Reports ??????? ????: ????????- ????????? ??????? ?????? ?. ?. ????????? ?????. ?????? ?? ??????? ? ??????????? ??????????. ?????-?????????, 2008. 247 ?. ? ?????????? ??????? ???? ????...- ??????, ???????????????? ?????? 146 Slavia Centralis 1/2011 Ocene, zapiski, poro?ila Reviews, Notes, Reports ????????? ?? ? ????????? ????? ? ????, ? ???????? ?? ?????? ?????- ????????? ??????????? ?????? ????. ??? ???????? ?? ?????????? ???...

????????, ??????????; Toichkina, Aleksandra

2011-01-01T23:59:59.000Z

92

Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational Energy AgencyImpactSouthDepartment of09-01SpecialStandard Review

93

Draft Columbia River Basin Research Plan NOTE: This DRAFT document has not been reviewed or endorsed by the  

E-Print Network [OSTI]

and Conservation Council April 2005 #12;ii Table of Contents I. Planning for the Future, Taking Stock Program 98 #12;1 I. Planning for the Future, Taking Stock of the Present Introduction This Research Plan

94

602 IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS--PART C: APPLICATIONS AND REVIEWS, VOL. 37, NO. 4, JULY 2007 Planning Product Configurations Based on Sales Data  

E-Print Network [OSTI]

602 IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS--PART C: APPLICATIONS AND REVIEWS, VOL. 37, NO. 4, JULY 2007 Planning Product Configurations Based on Sales Data Andrew Kusiak, Member, IEEE customization. Delivering products that meet the require- ments of individual customers complicates

Kusiak, Andrew

95

Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993  

SciTech Connect (OSTI)

In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue to analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.

Jannik, G.T. [comp.; Mamatey, A.; Arnett, M.

1993-10-05T23:59:59.000Z

96

* This reference number refers to the recommendation number given in the EPSRC/STFC Review of Nuclear Physics and Nuclear Engineering Report Action Plan for the EPSRC/STFC Review of Nuclear Physics and Nuclear Engineering  

E-Print Network [OSTI]

of Nuclear Physics and Nuclear Engineering Report Action Plan for the EPSRC/STFC Review of Nuclear Physics and Nuclear Engineering Preface This document will outline the recommendations in order of importance skills provision in nuclear engineering and related areas. Although these two areas have significant

97

A retrospective of VAWT technology.  

SciTech Connect (OSTI)

The study of Vertical-Axis Wind Turbine (VAWT) technology at Sandia National Laboratories started in the 1970's and concluded in the 1990's. These studies concentrated on the Darrieus configurations because of their high inherent efficiency, but other configurations (e.g., the Savonius turbine) were also examined. The Sandia VAWT program culminated with the design of the 34-m 'Test Bed' Darrieus VAWT. This turbine was designed and built to test various VAWT design concepts and to provide the necessary databases to validate analytical design codes and algorithms. Using the Test Bed as their starting point, FloWind Corp. developed a commercial VAWT product line with composite blades and an extended height-to-diameter ratio. The purpose of this paper is to discuss the design process and results of the Sandia 34-m VAWT Test Bed program and the FloWind prototype development program with an eye toward future offshore designs. This paper is our retrospective of the design, analysis, testing and commercial process. Special emphasis is given to those lessons learned that will aid in the development of an off-shore VAWT.

Ashwill, Thomas D.; Sutherland, Herbert J. (HJS Consulting, Albuquerque, NM); Berg, Dale E.

2012-01-01T23:59:59.000Z

98

DOE Preliminary Plan for Retrospective Analysis of Existing Rules |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at MultipleorderNuclearThis factCarbon-CaptureAPGA Email

99

Preliminary Plan for Retrospective Analysis of Existing Rules  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21,- EA-1999-07 |EA-2005-03|EA-97-12 |98-09

100

Notice of Availability of Preliminary Plan for Retrospective Analysis of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment of Energy Advanced FramingBoost |Draft Environmental

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

AHRI Preliminary Plan for Retrospective Analysis | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials2014 ChiefEnergy Furnace NOPR,Communication AHAM ExAHRI

102

STANDARD REVIEW PLAN  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13 Page 1 of 1 ThisAprilOCTOBER 2-3,Strengthening

103

STANDARD REVIEW PLAN  

Office of Environmental Management (EM)

phase of the project or the maturity of the design? SG The safety-in-design approach and philosophy is described or defined (e.g., assurance of protection of public from...

104

Standard Review Plan Overview  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational Energy AgencyImpactSouthDepartment of09-01Special

105

Motion Planning ! Jana Kosecka!  

E-Print Network [OSTI]

1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

Kosecka, Jana

106

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2  

SciTech Connect (OSTI)

NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

NONE

1996-02-01T23:59:59.000Z

107

Performance-based ratemaking for electric utilities: Review of plans and analysis of economic and resource-planning issues. Volume 2, Appendices  

SciTech Connect (OSTI)

This document contains summaries of the electric utilities performance-based rate plans for the following companies: Alabama Power Company; Central Maine Power Company; Consolidated Edison of New York; Mississippi Power Company; New York State Electric and Gas Corporation; Niagara Mohawk Power Corporation; PacifiCorp; Pacific Gas and Electric; Southern California Edison; San Diego Gas & Electric; and Tucson Electric Power. In addition, this document also contains information about LBNL`s Power Index and Incentive Properties of a Hybrid Cap and Long-Run Demand Elasticity.

Comnes, G.A.; Stoft, S.; Greene, N. [Lawrence Berkeley Lab., CA (United States); Hill, L.J. [Oak Ridge National Lab., TN (United States)

1995-11-01T23:59:59.000Z

108

Book Review: Radiological Conditions in the Dnieper River Basin: Assessment by an International Expert Team and Recommendations for an Action Plan  

SciTech Connect (OSTI)

This article is a book review of a report from the International Atomic Energy Agency that was prepared by a team of scientists from Belarus, the Russian Federation, and Ukraine as an assessment of radiological contamination of the Dnieper River, which flows through these three countries. The topics covered begin with radioactive sources (actual and potential) including areas affected by the Chernobyl nuclear accident, nuclear power plants along the river and its tributaries, uranium mining and ore processing, radioactive waste storage and disposal sites, and non-power sources, such as medicine, industry, and research. The report continues with an assessment of human exposures to radiation from these sources. An additional area of consideration is radiological hot spots in the region. The report finishes with conclusions and recommendations to the regional governments for a strategic action plan and individual government national plans.

Napier, Bruce A.

2007-12-31T23:59:59.000Z

109

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

110

2014 Headquarters Facilities Master Security Plan - Chapter 7...  

Office of Environmental Management (EM)

7, Surveys and Reviews 2014 Headquarters Facilities Master Security Plan - Chapter 7, Surveys and Reviews June 2014 2014 Headquarters Facilities Master Security Plan - Chapter 7,...

111

SOLERAS - Saudi University Solar Cooling Laboratories Project: King Faisal University. Design analysis study. Volume 1. Design review report, data acquisition plan and experimental plan  

SciTech Connect (OSTI)

Four preliminary passive solar dwelling design concepts were developed based upon previously established climatic design criteria and an identification of applicable passive cooling strategies was made. These were quantitatively compared for their thermal performance based upon a computer program. The selected concept was optimized and preliminary construction drawings and details were submitted for review by SOLERAS. This report deals with the further refinement and development of the design concept and improvements of the performance of the selected passive elements. The final design has been detailed for actual construction and monitoring at the King Faisal University Dammam Campus. In addition this report addresses the comparative evaluation of the previous design concepts utilizing more rigorous computer simulation methods.

Not Available

1986-01-01T23:59:59.000Z

112

Reducing Regulatory Burden - EO 13563 Retrospective Review | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |Rebecca MatulkaDeliveryUpdated NovemberChallenges. |of

113

Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartment ofColumbusReport #Study | Department of

114

INVESTIGATION Retrospective View of North American Potato  

E-Print Network [OSTI]

INVESTIGATION Retrospective View of North American Potato (Solanum tuberosum L.) Breeding in the 20, Madison, Wisconsin, 53706 ABSTRACT Cultivated potato (Solanum tuberosum L.), a vegetatively propagated explore the effects of potato breeding at the genome level, we used 8303 single-nucleotide polymorphism

Douches, David S.

115

Articles Intercomparison of Retrospective Radon Detectors  

E-Print Network [OSTI]

We performed both a laboratory and a field intercompanison of two novel glass-based retrospective radon detectors previously used in major radon case-control studies performed in Missouri and Iowa. The new detectors estimate retrospective residential radon exposure from the accumulation of a long-lived radon decay product, 210Pb, in glass. The detectors use track registration material in direct contact with glass surfaces to measure the a-emission of a 210Pb-decay product, 210Po. The detector's track density generation rate (tracks per square centimeter per hour) is proportional to the sur6ce a-activity. In the absence of other strong sources of a-emission in the glass, the implanted surface a-activity should be proportional to the accumulated 210Po, and hence to the cumulative radon gas exposure. The goals of the intercomparison were to a) perform collocated measurements using two different glass-based retrospective radon detectors in a controlled laboratory environment to compare their relative response to implanted polonium in the absence of environmental variation, b) perform collocated measurements using two different retrospective radon progeny detectors in a variety of residential settings to compare their detection of glass-implanted polonium activities, and c) examne the correlation between track density rates and contemporary radon gas concentrations. The laboratory results suggested that the materials

R. William Field; Daniel J. Steck; Mary Ann Parkhurst; Judy A. Mahaffey; Michael C. R. Alavanja

116

Timed CSP: A Retrospective Joel Ouaknine 1  

E-Print Network [OSTI]

powerful: by syntactically transforming a Timed CSP process into a CSP one (essentially dropping all WAITAPC 2005 Timed CSP: A Retrospective Jo¨el Ouaknine 1 Oxford University Computing Laboratory, UK Timed CSP, from its inception nearly twenty years ago to very recent semantical and algorithmic

Ouaknine, Joël

117

Introductory materials for committee members: 1) instructions for the Los Alamos National Laboratory fiscal year 2010 capability reviews 2) NPAC strategic capability planning 3) Summary self-assessment for the nuclear and particle physics, astrophysics an  

SciTech Connect (OSTI)

Los Alamos National Laboratory (LANL) uses external peer review to measure and continuously improve the quality of its science, technology and engineering (STE). LANL uses capability reviews to assess the STE quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. STE capabilities are define to cut across directorates providing a more holistic view of the STE quality, integration to achieve mission requirements, and mission relevance. The scope of these capabilities necessitate that there will be significant overlap in technical areas covered by capability reviews (e.g., materials research and weapons science and engineering). In addition, LANL staff may be reviewed in different capability reviews because of their varied assignments and expertise. LANL plans to perform a complete review of the Laboratory's STE capabilities (hence staff) in a three-year cycle. The principal product of an external review is a report that includes the review committee's assessments, commendations, and recommendations for STE. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). This report will be used by Laboratory Management for STE assessment and planning. The report is also provided to the Department of Energy (DOE) as part of LANL's Annual Performance Plan and to the Los Alamos National Security (LANS) LLC's Science and Technology Committee (STC) as part of its responsibilities to the LANS Board of Governors.

Redondo, Antonio [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

118

Evolving treatment plan quality criteria from institution-specific experience  

SciTech Connect (OSTI)

Purpose: The dosimetric aspects of radiation therapy treatment plan quality are usually evaluated and reported with dose volume histogram (DVH) endpoints. For clinical practicality, a small number of representative quantities derived from the DVH are often used as dose endpoints to summarize the plan quality. National guidelines on reference values for such quantities for some standard treatment approaches are often used as acceptance criteria to trigger treatment plan review. On the other hand, treatment prescription and planning approaches specific to each institution warrants the need to report plan quality in terms of practice consistency and with respect to institution-specific experience. The purpose of this study is to investigate and develop a systematic approach to record and characterize the institution-specific plan experience and use such information to guide the design of plan quality criteria. In the clinical setting, this approach will assist in (1) improving overall plan quality and consistency and (2) detecting abnormal plan behavior for retrospective analysis. Methods: The authors propose a self-evolving methodology and have developed an in-house prototype software suite that (1) extracts the dose endpoints from a treatment plan and evaluates them against both national standard and institution-specific criteria and (2) evolves the statistics for the dose endpoints and updates institution-specific criteria. Results: The validity of the proposed methodology was demonstrated with a database of prostate stereotactic body radiotherapy cases. As more data sets are accumulated, the evolving institution-specific criteria can serve as a reliable and stable consistency measure for plan quality and reveals the potential use of the ''tighter'' criteria than national standards or projected criteria, leading to practice that may push to shrink the gap between plans deemed acceptable and the underlying unknown optimality. Conclusions: The authors have developed a rationale to improve plan quality and consistency, by evolving the plan quality criteria from institution-specific experience, complementary to national standards. The validity of the proposed method was demonstrated with a prototype system on prostate stereotactic body radiotherapy (SBRT) cases. The current study uses direct and indirect DVH endpoints for plan quality evaluation, but the infrastructure proposed here applies to general outcome data as well. The authors expect forward evaluation together with intelligent update based on evidence-based learning, which will evolve the clinical practice for improved efficiency, consistency, and ultimately better treatment outcome.

Ruan, D.; Shao, W.; DeMarco, J.; Tenn, S.; King, C.; Low, D.; Kupelian, P.; Steinberg, M. [Department of Radiation Oncology, University of California, Los Angeles, California 90095 (United States)

2012-05-15T23:59:59.000Z

119

Waste Package Materials Performance Peer Review | Department...  

Broader source: Energy.gov (indexed) [DOE]

Waste Package Materials Performance Peer Review Waste Package Materials Performance Peer Review A consensus peer review of the current technical basis and the planned experimental...

120

FORMALDEHYDE Formaldehyde Management Plan i  

E-Print Network [OSTI]

and Evaluation) Facilities Management Work Control Center (40)5-2222 (Repair of Facility Equipment DeficienciesFORMALDEHYDE MANAGEMENT PLAN #12;Formaldehyde Management Plan i Review and Approval Authority Formaldehyde Management Plan this page intentionally blank #12;Formaldehyde Management Plan iii Table

Rubloff, Gary W.

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Plan generation strategies for a knowledge based process planning system  

E-Print Network [OSTI]

-12. Checking Manufacturability at Site 3-13. Plan Alternate Process 3-14. Review Plans Critically 3-15. Plan Refinement 3-16. Evaluation of Plans 45 47 48 49 50 52 3-17. Detail Plan 53 3-18. Understanding Part Features 55 3-19. Evolving... manufacturing system where quick decisions have to be made on the shop when production is interrupted for contingencies. 15 2. 3. 2 The Generative Approach A generative process planning system synthesizes new process plans automatically. It enables...

Hari, Umesh

1993-01-01T23:59:59.000Z

122

A Retrospective Filter Trust Region Algorithm For Unconstrained ...  

E-Print Network [OSTI]

In this paper, we propose a retrospective filter trust re- gion algorithm for .... [33] present the self-adaptive trust region methods and give some discussions about

2010-01-05T23:59:59.000Z

123

Retrospective Benefit-Cost Evaluation of DOE Investment in Photovoltai...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Retrospective Benefit-Cost Evaluation of DOE Investment in Photovoltaic Energy Systems solarpv.pdf More Documents & Publications SunShot Vision Study: February 2012 (Book),...

124

aluminium sulphate retrospective: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

was created from the Eta Data Assimilation System Robock, Alan 178 Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked...

125

antidiabetes drugs retrospective: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

set was created from the Eta Data Assimilation System Robock, Alan 99 Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked...

126

appendicitis retrospective analysis: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

was created from the Eta Data Assimilation System Robock, Alan 120 Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked...

127

acute appendicitis retrospective: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

set was created from the Eta Data Assimilation System Robock, Alan 89 Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked...

128

adults retrospective cohort: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

was created from the Eta Data Assimilation System Robock, Alan 140 Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked...

129

apheresis retrospective analysis: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

set was created from the Eta Data Assimilation System Robock, Alan 93 Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked...

130

IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS--PART C: APPLICATIONS AND REVIEWS, VOL. 33, NO. 3, AUGUST 2003 413 A Secure PLAN  

E-Print Network [OSTI]

. 3, AUGUST 2003 413 A Secure PLAN Michael Hicks, Angelos D. Keromytis, and Jonathan M. Smith Abstract

Yang, Junfeng

131

Independent Oversight Review, Livermore Site Office - October...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

National Laboratory Activity-level Work Planning & Control Office of Environmental Management Work Planning and Control Oversight Enterprise Assessments Targeted Review,...

132

2010 Annual Planning Summary for Stanford Linear Accelerator...  

Energy Savers [EERE]

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Stanford Linear Accelerator Center...

133

APS Safety Plan Review Committee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

members are appointed by the AES Division Director. The current members of the SPRC are: Bruce Glagola AES - Chair Edmund Chang AES Paul Rossi XSD Steve Davey AES Nena Moonier AES...

134

ORISE: Scientific Peer Review Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACKRadiological program assessmentResearchScience

135

Planning and Conducting Readiness Reviews  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21, 2015 7:00AM to 10:30AM EDT| Department3006-2010

136

A study of IMRT planning parameters on planning efficiency, delivery efficiency, and plan quality  

SciTech Connect (OSTI)

Purpose: To improve planning and delivery efficiency of head and neck IMRT without compromising planning quality through the evaluation of inverse planning parameters.Methods: Eleven head and neck patients with pre-existing IMRT treatment plans were selected for this retrospective study. The Pinnacle treatment planning system (TPS) was used to compute new treatment plans for each patient by varying the individual or the combined parameters of dose/fluence grid resolution, minimum MU per segment, and minimum segment area. Forty-five plans per patient were generated with the following variations: 4 dose/fluence grid resolution plans, 12 minimum segment area plans, 9 minimum MU plans, and 20 combined minimum segment area/minimum MU plans. Each plan was evaluated and compared to others based on dose volume histograms (DVHs) (i.e., plan quality), planning time, and delivery time. To evaluate delivery efficiency, a model was developed that estimated the delivery time of a treatment plan, and validated through measurements on an Elekta Synergy linear accelerator. Results: The uncertainty (i.e., variation) of the dose-volume index due to dose calculation grid variation was as high as 8.2% (5.5 Gy in absolute dose) for planning target volumes (PTVs) and 13.3% (2.1 Gy in absolute dose) for planning at risk volumes (PRVs). Comparison results of dose distributions indicated that smaller volumes were more susceptible to uncertainties. The grid resolution of a 4 mm dose grid with a 2 mm fluence grid was recommended, since it can reduce the final dose calculation time by 63% compared to the accepted standard (2 mm dose grid with a 2 mm fluence grid resolution) while maintaining a similar level of dose-volume index variation. Threshold values that maintained adequate plan quality (DVH results of the PTVs and PRVs remained satisfied for their dose objectives) were 5 cm{sup 2} for minimum segment area and 5 MU for minimum MU. As the minimum MU parameter was increased, the number of segments and delivery time were decreased. Increasing the minimum segment area parameter decreased the plan MU, but had less of an effect on the number of segments and delivery time. Our delivery time model predicted delivery time to within 1.8%. Conclusions: Increasing the dose grid while maintaining a small fluence grid allows for improved planning efficiency without compromising plan quality. Delivery efficiency can be improved by increasing the minimum MU, but not the minimum segment area. However, increasing the respective minimum MU and/or the minimum segment area to any value greater than 5 MU and 5 cm{sup 2} is not recommended because it degrades plan quality.

Mittauer, Kathryn [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 and J. Crayton Pruitt Family Department of Biomedical Engineering, University of Florida, Gainesville, Florida 32611 (United States); Lu Bo; Yan Guanghua; Kahler, Darren; Amdur, Robert; Liu Chihray [Department of Radiation Oncology, College of Medicine, University of Florida, Gainesville, Florida 32603 (United States); Gopal, Arun [Department of Radiation Oncology, New York-Presbyterian Hospital, Columbia University, New York, New York 10032 (United States)

2013-06-15T23:59:59.000Z

137

Health, Ageing and Ethnicity: A Retrospective and Prospects  

E-Print Network [OSTI]

Health, Ageing and Ethnicity: A Retrospective and Prospects Naina Patel, PhD. Dr. Patel called Minority Elderly Care (MEC) under the EC 5th Framework Research Programme. Formerly the UK

138

Climate Action Plans and Long-Range Transportation  

E-Print Network [OSTI]

Climate Action Plans and Long-Range Transportation Plans in the Pacific Northwest: A Review Climate Change and Impacts Mitigation versus Adaptation Impacts of Climate Change: Nation & the Pacific Northwest Climate Change Planning Efforts Transportation Sector Response - Survey Recommendations Continued

Bertini, Robert L.

139

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

140

Retrospective examination of geothermal environmental assessments  

SciTech Connect (OSTI)

Since 1976, the Department of Energy (DOE) has supported a variety of programs and projects dealing with the exploration, development, and utilization of geothermal energy. This report presents an overview of the environmental impacts associated with these efforts. Impacts that were predicted in the environmental analyses prepared for the programs and projects are reviewed and summarized, along with measures that were recommended to mitigate these impacts. Also, for those projects that have gone forward, actual impacts and implemented mitigation measures are reported, based on telephone interviews with DOE and project personnel. An accident involving spills of geothermal fluids was the major environmental concern associated with geothermal development. Other important considerations included noise from drilling and production, emissions of H/sub 2/S and cooling tower drift, disposal of solid waste (e.g., from H/sub 2/S control), and the cumulative effects of geothermal development on land use and ecosystems. Mitigation measures were frequently recommended and implemented in conjunction with noise reduction; drift elimination; reduction of fugitive dust, erosion, and sedimentation; blowout prevention; and retention of wastes and spills. Monitoring to resolve uncertainties was often implemented to detect induced seismicity and subsidence, noise, drift deposition, concentrations of air and water pollutants, and effects on groundwater. The document contains an appendix, based on these findings, which outlines major environmental concerns, mitigation measures, and monitoring requirements associated with geothermal energy. Sources of information on various potential impacts are also listed.

Webb, J.W.; Eddlemon, G.K.; Reed, A.W.

1984-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

142

A Review of the Department of Energys Implementation of Executive Order 12898 and Recommendations for a Second Five-Year Strategic Plan  

Broader source: Energy.gov [DOE]

At the request of the U.S Department of Energys Office of Legacy Management, the Medical University of South Carolina (MUSC) performed a historical review of the Offices implementation of...

143

Independent Scientific Review Panel for the Northwest Power & Conservation Council  

E-Print Network [OSTI]

at themes that emerged in previous ISRP retrospectives, examining a subset of projects that were reviewed population benefits. However, demonstrations of population benefits at the watershed scale using approaches

144

Author Retrospective for Energy Conservation Techniques for Disk  

E-Print Network [OSTI]

Author Retrospective for Energy Conservation Techniques for Disk Array-based Servers Eduardo original paper ti- tled "Energy Conservation Techniques for Disk Array-based Servers", which was published.1145/2591635.2591666 Categories and Subject Descriptors D.4 [Operating systems]: Storage management Keywords Energy conservation

Bianchini, Ricardo

145

Timed CSP: A Retrospective Jo el Ouaknine 1  

E-Print Network [OSTI]

powerful: by syntactically transforming a Timed CSP process into a CSP one (essentially dropping all WAITAPC 2005 Timed CSP: A Retrospective Jo? el Ouaknine 1 Oxford University Computing Laboratory, UK Timed CSP, from its inception nearly twenty years ago to very recent semantical and algorithmic

Ouaknine, Joël

146

Quality assurance of HDR prostate plans: Program implementation at a community hospital  

SciTech Connect (OSTI)

Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

Rush, Jennifer B. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States); Thomas, Michael D. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States)]. E-mail: mthomas@hprhs.com

2005-01-01T23:59:59.000Z

147

Enterprise Assessments Targeted Review,Y-12 National Security...  

Office of Environmental Management (EM)

Y-12 National Security Complex - March 2015 Enterprise Assessments Targeted Review,Y-12 National Security Complex - March 2015 March 2015 Targeted Review of Work Planning and...

148

A.O. Smith Corporation Response to Preliminary Plan for Retrospective  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014DepartmentI325 8 (8-89) EFG (07-90) United

149

American particle and nuclear physics planning  

SciTech Connect (OSTI)

In the United States the planning process relevant to future deep inelastic scattering involves both the high energy physics and nuclear physics funding and the two communities. In Canada there is no such split between the communities. Within the past two years there have been several planning initiatives and there may be more to come. We review the current status of both the planning and the plans.

Montgomery, Hugh E. [JLAB

2014-10-01T23:59:59.000Z

150

Retrospective dosimetry analyses of reactor vessel cladding samples  

SciTech Connect (OSTI)

Reactor pressure vessel cladding samples for Ringhals Units 3 and 4 in Sweden were analyzed using retrospective reactor dosimetry techniques. The objective was to provide the best estimates of the neutron fluence for comparison with neutron transport calculations. A total of 51 stainless steel samples consisting of chips weighing approximately 100 to 200 mg were removed from selected locations around the pressure vessel and were sent to Pacific Northwest National Laboratory for analysis. The samples were fully characterized and analyzed for radioactive isotopes, with special interest in the presence of Nb-93m. The RPV cladding retrospective dosimetry results will be combined with a re-evaluation of the surveillance capsule dosimetry and with ex-vessel neutron dosimetry results to form a comprehensive 3D comparison of measurements to calculations performed with 3D deterministic transport code. (authors)

Greenwood, L. R.; Soderquist, C. Z. [Battelle Pacific Northwest National Laboratory, Richland, WA 99352 (United States); Fero, A. H. [Westinghouse Electric Company, Cranberry Twp., PA 16066 (United States)

2011-07-01T23:59:59.000Z

151

Divisional Space Review and Development of a  

E-Print Network [OSTI]

Divisional Space Review and Development of a Master Plan Abbreviated Report: Executive Summary 2009 #12;EXECUTIVE SUMMARY The Space Review Committee was established by Dean Cristina Amon of the Committee for the Divisional Space Review and Development of a Master Plan. Section A provides valuable

152

Institutional Plan FY 2003 - 2007  

SciTech Connect (OSTI)

The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and operations goals. The Initiatives section describes some of the specific new research programs representing major long-term opportunities for the Department of Energy and Berkeley Lab. The Operations Strategic Planning section describes our strategic thinking in the areas of human resources; site and cyber security; workforce diversity; communications and trust; integrated safety management; and technology transfer activities. The Infrastructure Strategic Planning section describes Berkeley Lab's facilities planning process and our site and facility needs. The Summary of Major Issues section provides context for discussions at the Institutional Planning On-Site Review. The Resource Projections are estimates of required budgetary authority for Berkeley Lab's research programs.

Chartock, Michael; Hansen, Todd

2003-01-27T23:59:59.000Z

153

Independent Oversight Review, Savannah River Site- August 2011  

Broader source: Energy.gov [DOE]

Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

154

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

a single BPA data repository * Data quality improvements * Improve model alignment with WECC planning data * Improve WECC base case coordination * Align the BPA data model with...

155

Planning Theory as an Institutional Innovation: Diverse Approaches and Nonlinear Trajectory of  

E-Print Network [OSTI]

that the profession of planning was created as a response to social demand. Planning functions as an institutional of the Evolution of Planning Theory Tingwei Zhang Published in CITY PLANNING REVIEW, 2006, Vol. 30 (8) 9-18 Best American planning experiences with Chinese planning practices in the last 50 years, the author argues

Illinois at Chicago, University of

156

Potential of Hybrid Computational Phantoms for Retrospective Heart Dosimetry After Breast Radiation Therapy: A Feasibility Study  

SciTech Connect (OSTI)

Purpose: Current retrospective cardiovascular dosimetry studies are based on a representative patient or simple mathematic phantoms. Here, a process of patient modeling was developed to personalize the anatomy of the thorax and to include a heart model with coronary arteries. Methods and Materials: The patient models were hybrid computational phantoms (HCPs) with an inserted detailed heart model. A computed tomography (CT) acquisition (pseudo-CT) was derived from HCP and imported into a treatment planning system where treatment conditions were reproduced. Six current patients were selected: 3 were modeled from their CT images (A patients) and the others were modelled from 2 orthogonal radiographs (B patients). The method performance and limitation were investigated by quantitative comparison between the initial CT and the pseudo-CT, namely, the morphology and the dose calculation were compared. For the B patients, a comparison with 2 kinds of representative patients was also conducted. Finally, dose assessment was focused on the whole coronary artery tree and the left anterior descending coronary. Results: When 3-dimensional anatomic information was available, the dose calculations performed on the initial CT and the pseudo-CT were in good agreement. For the B patients, comparison of doses derived from HCP and representative patients showed that the HCP doses were either better or equivalent. In the left breast radiation therapy context and for the studied cases, coronary mean doses were at least 5-fold higher than heart mean doses. Conclusions: For retrospective dose studies, it is suggested that HCP offers a better surrogate, in terms of dose accuracy, than representative patients. The use of a detailed heart model eliminates the problem of identifying the coronaries on the patient's CT.

Moignier, Alexandra, E-mail: alexandra.moignier@irsn.fr [Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France)] [Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France); Derreumaux, Sylvie; Broggio, David; Beurrier, Julien [Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France)] [Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France); Chea, Michel; Boisserie, Gilbert [Groupe Hospitalier Pitie Salpetriere, Service de Radiotherapie, Paris (France)] [Groupe Hospitalier Pitie Salpetriere, Service de Radiotherapie, Paris (France); Franck, Didier; Aubert, Bernard [Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France)] [Institut de Radioprotection et de Surete Nucleaire, Fontenay-aux-Roses (France); Mazeron, Jean-Jacques [Groupe Hospitalier Pitie Salpetriere, Service de Radiotherapie, Paris (France)] [Groupe Hospitalier Pitie Salpetriere, Service de Radiotherapie, Paris (France)

2013-02-01T23:59:59.000Z

157

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December, 2014 Review of the Waste Isolation Pilot Plant Conduct of Maintenance Recovery Plan The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department...

158

Enterprise Assessments Review, Waste Isolation Pilot Plant -...  

Energy Savers [EERE]

December 2014 Review of the Waste Isolation Pilot Plant Recovery Plan for Operating Diesel Equipment with Available Underground Airflows. The Office of Nuclear Safety and...

159

ACQUISITION PLANNING  

Office of Environmental Management (EM)

7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition...

160

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

162

Summary - System Planning for Low-Activity Waste Treatment at...  

Office of Environmental Management (EM)

Management (DOE-EM) External Technical Review of System Planning for Low-Activity Waste Treatment at Hanford Why DOE-EM Did This Review Construction of the facilities of...

163

Facilities Operations, Planning, and Engineering Services  

E-Print Network [OSTI]

Facilities Operations, Planning, and Design Engineering Services Energy Management & Water and In- house Engineering Mechanical Electrical Engineering Data Analysis Construction Services In Conservation Capital Project-Bldg Systems Review Commissioning BSL3/DLAM Engineer Building Systems Engineering

McLaughlin, Richard M.

164

Building Emergency Plan - Department of Mathematics, Purdue ...  

E-Print Network [OSTI]

Aug 30, 2013 ... Campus Emergency Preparedness and Planning Office for review, distribution to the fire ... 7) Assist those who need help, but do not put yourself at risk attempting to ..... them inform emergency personnel of your location.

Physical Facilities

2013-11-12T23:59:59.000Z

165

Kaons - Recent Results and Future Plans  

E-Print Network [OSTI]

Recent results and future plans of kaon physics are reviewed. Topics include CP violation, rare decays, light neutral-boson search, lepton flavor universality, and CPT and QM tests.

T. K. Komatsubara

2010-06-22T23:59:59.000Z

166

A retrospective study on changes in residents' physical activities, social  

E-Print Network [OSTI]

,?, Chia-Yuan Yu b, Chanam Lee b, Zhipen a Department of Architecture, Center for Health Systems & Design, Texas A&M University, 313 b Department of Landscape Architecture and Urban Planning, Center for Health Systems & Dessearch Supplement. 891@neo...

Zhu, Xuemei; Yu, Chia-Yuan; Lee, Chanam; Lu, Zhipeng; Mann, George

2014-01-01T23:59:59.000Z

167

Groundwater protection management program plan  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

168

Chemical Hygiene Plan For University of Florida  

E-Print Network [OSTI]

Chemical Hygiene Plan For University of Florida Laboratories This is a site specific Chemical Reviewed August 2007 Revised August 2007 #12;2 I. Introduction This Chemical Hygiene Plan has been with UF laboratory chemical operations and is intended to meet the requirements of the OSHA Laboratory

Slatton, Clint

169

Supplement to The Imnaha Subbasin Plan Introduction  

E-Print Network [OSTI]

2004 draft Imnaha Subbasin Assessment and Imnaha Subbasin Management Plan (available at www in these documents. This supplement was reviewed by the Imnaha Technical and Planning Teams during the fall of 2004. This supplement is presented in four sections that correspond to information requested by the Northwest Power

170

Annual Energy Outlook Retrospective Review: Evaluation of 2014 and Prior Reference Case Projections  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781Title: Telephone:shortOil and Natural GasAnnual Energy Outlook

171

REVIEW ARTICLES Fusion plasma experiments on TFTR: A 20 year retrospective*  

E-Print Network [OSTI]

and the behavior of energetic particles. The progress has been the result of the construction of new facilities University, Princeton, New Jersey 08543 Received 19 November 1997; accepted 13 January 1998 The Tokamak of energetic alpha particles, spanned over two decades from conception to completion. During the design of TFTR

172

E-Print Network 3.0 - approaches retrospective comparison Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

appliance remanufacturing relative to purchasing Summary: . 2. Retrospective life cycle energy comparison of a newly produced dishwasher and a remanufactured... the life cycle...

173

E-Print Network 3.0 - aircraft retrospective cohort Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or cross-sectional or retrospective or prospective in the bottom row of your search. Retrieving Research Source: MacMillan, Andrew - Department of Biochemistry,...

174

Medical Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubey MathematicaMeasuringMedical Plans Medical Plans

175

Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBiSiteNeutronStrategic Plan The strategic planning process1/7/2010

176

planning for emergencies  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF8/%2A ennike |1/%2A en Planning for

177

Cogeneration Planning  

E-Print Network [OSTI]

cogeneration projects for its plants. Of concern to us are rapidly escalating electrical costs plus concern about the future of some utilities to maintain reserve capacity. Our review to date revolves around (1) obtaining low-cost reliable fuel supplies...

Mozzo, M. A. Jr.

178

REVIEW PAPER Ecosystem Impacts of Geoengineering: A Review for Developing  

E-Print Network [OSTI]

REVIEW PAPER Ecosystem Impacts of Geoengineering: A Review for Developing a Science Plan Lynn M September 2011 / Accepted: 31 January 2012 / Published online: 20 March 2012 Abstract Geoengineering methods and functioning in some regions. Two types of geoengineering activities that have been proposed are: carbon

Jackson, Robert B.

179

INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT  

SciTech Connect (OSTI)

The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

2011-05-31T23:59:59.000Z

180

University of Tennessee Health Science Center Emergency Evacuation Plan  

E-Print Network [OSTI]

location outside your building. Review your operations to determine which critical operating systems may for distribution and review by employees. Conduct training in plan requirements with all building occupants. Ensure training records, using the training form in the plan appendix. #12;2 Conduct periodic evacuation drills

Cui, Yan

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Plan Your School Visit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit...

182

Milestone Plan Process Improvement  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the...

183

Energy planning and management plan  

SciTech Connect (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

184

Chandler- Expedited Plan Review for Green Buildings  

Broader source: Energy.gov [DOE]

The mayor and city council of Chandler, AZ adopted Resolution 4199 in June 2008, establishing incentives for green building in the private sector. Permit applications for buildings registered with...

185

Nuclear Waste Technical Review Board Performance Plan  

E-Print Network [OSTI]

to disposing of spent nuclear fuel and high-level radioactive waste were set forth by Congress in the NWPA. The goals are to develop a repository or repositories for disposing of high-level radioactive waste spent nuclear fuel and high- level radioactive waste. The Board's general goals and strategic objectives

186

Standard Review Plan - Overview | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverview * AnalyzerNano Olivines8forCode

187

SITE PLAN REVIEW REGULATIONS DURHAM, NEW HAMPSHIRE  

E-Print Network [OSTI]

, or institution. 3.02 Definitions (Amended July 14, 2010) Best Management Practices (BMP): Methods and means that have been determined to be the most effective, practical approaches of preventing or reducing pollution to buildings or other structures, mining, dredging, filling, grading, paving, excavation, or drilling

188

Boston College Comprehensive Emergency Management Plan January 2014 BOSTON COLLEGE  

E-Print Network [OSTI]

. Preparedness is operationally focused on establishing guidelines, plans, procedures, protocols, and standards Operations Center 27 Appendix G Acronyms 28 Campus Map 29 Addendum Detailed Operation Procedures (under 9 Meetings 10 Plans Development and Maintenance 10 Plan Review, Testing, and Exercises 11 Training

Huang, Jianyu

189

Closing the Competitive Gap: A Retrospective Analysis of  

E-Print Network [OSTI]

of an economic evaluation of the Advanced Technology Program's (ATP's) "two-millimeter project" (2mm project of the ATP 2mm Project Prepared for Economic Assessment Office Advanced Technology Program National Institute and Planning, Massachusetts Institute of Technology, krp@mit.edu Nicolas O. Rockler, Regional Economic

190

Lafayette Metropolitan Planning Organization 2030 Transportation Plan  

E-Print Network [OSTI]

And Development Lafayette Metropolitan Planning Organization 2030 Transportation Plan DRAFT FINAL REPORT Prepared by Neel-Schaffer, Inc... ? 2020 DEFICIENCIES ........................................................................................... 51 FIGURE 11 ? 2030 DEFICIENCIES ........................................................................................... 52 FIGURE 12...

Lafayette Metropolitan Planning Organization

2010-10-31T23:59:59.000Z

191

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

192

Transjugular Intrahepatic Portosystemic Shunt for Treatment of Cirrhosis-related Chylothorax and Chylous Ascites: Single-institution Retrospective Experience  

SciTech Connect (OSTI)

PurposeTo investigate the efficacy and safety of the use of transjugular intrahepatic portosystemic shunt (TIPS) creation to treat cirrhosis-related chylous collections (chylothorax and chylous ascites).MethodsWe retrospectively reviewed data from four patients treated for refractory cirrhosis-related chylous collections with TIPS at our institution over an 8 year period.ResultsOne patient had chylothorax, and three patients had concomitant chylothorax and chylous ascites. There were no major complications, and the only procedure-related complications occurred in two patients who had mild, treatable hepatic encephalopathy. All patients had improvement as defined by decreased need for thoracentesis or paracentesis, with postprocedure follow-up ranging from 19 to 491 days.ConclusionTIPS is a safe procedure that is effective in the treatment of cirrhosis-related chylous collections.

Kikolski, Steven G., E-mail: skikolski@ucsd.edu; Aryafar, Hamed, E-mail: haryafar@ucsd.edu; Rose, Steven C., E-mail: scrose@ucsd.edu [University of California San Diego Health Sciences, Department of Radiology (United States); Roberts, Anne C., E-mail: acroberts@ucsd.edu [University of California San Diego Health Sciences, Department of Vascular and Interventional Radiology (United States); Kinney, Thomas B., E-mail: tbkinney@ucsd.edu [University of California San Diego Health Sciences, Department of Radiology (United States)

2013-08-01T23:59:59.000Z

193

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

194

Plans, Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design Passive SolarCenterYou are here: SN Home page|Plans,

195

Program Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins GeraldDuncan McBranchProgram Planning at

196

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan Print

197

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout » Staff125,849| OSTI, US Dept ofStrategic Plan

198

Venus Technology Plan Venus Technology Plan  

E-Print Network [OSTI]

Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

Rathbun, Julie A.

199

UNBC Library External Review 2012 Library Response  

E-Print Network [OSTI]

UNBC Library External Review 2012 Library Response November 2, 2012 An external review was conducted of the UNBC Library services in April 2012 by Dr. Vicki Williamson of University of Saskatchewan is available at https://library.unbc.ca/external- review/ . Below is the Library's planned followup

Northern British Columbia, University of

200

Independent Oversight Review of the NNSA Production Office Readiness...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RR Readiness Review SAA Startup Approval Authority SIAP Site Integrated Assessment Plan SME Subject Matter Expert SNR Startup Notification Report SSTA Senior Scientific Technical...

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Volume II, Environment, Safety, and Health Special Review of...  

Broader source: Energy.gov (indexed) [DOE]

Safety, and Health Special Review, Department of Energy Laboratories - August 2008 Nanomaterials Safety Implementation Plan, Ames Laboratory Approaches to Safe Nanotechnology...

202

2013 Annual Merit Review Results Report - Technology Integration  

Broader source: Energy.gov (indexed) [DOE]

technical accomplishments included analysis, education and outreach, website and social media engagement, and the completion of the final plan. The reviewer commented in...

203

How to Interpret Thyroid Biopsy Results: A Three-Year Retrospective Interventional Radiology Experience  

SciTech Connect (OSTI)

Results of thyroid biopsy determine whether thyroid nodule resection is appropriate and the extent of thyroid surgery. At our institution we use 20/22-gauge core biopsy (CBx) in conjunction with fine-needle aspiration (FNA) to decrease the number of passes and improve adequacy. Occasionally, both ultrasound (US)-guided FNA and CBx yield unsatisfactory specimens. To justify clinical recommendations for these unsatisfactory thyroid biopsies, we compare rates of malignancy at surgical resection for unsatisfactory biopsy results against definitive biopsy results. We retrospectively reviewed a database of 1979 patients who had a total of 2677 FNA and 663 CBx performed by experienced interventional radiologists under US guidance from 2003 to 2006 at a tertiary-care academic center. In 451 patients who had surgery following biopsy, Fisher's exact test was used to compare surgical malignancy rates between unsatisfactory and malignant biopsy cohorts as well as between unsatisfactory and benign biopsy cohorts. We defined statistical significance at P = 0.05. We reported an overall unsatisfactory thyroid biopsy rate of 3.7% (100/2677). A statistically significant higher rate of surgically proven malignancies was found in malignant biopsy patients compared to unsatisfactory biopsy patients (P = 0.0001). The incidence of surgically proven malignancy in unsatisfactory biopsy patients was not significantly different from that in benign biopsy patients (P = 0.8625). In conclusion, an extremely low incidence of malignancy was associated with both benign and unsatisfactory thyroid biopsy results. The difference in incidence between these two groups was not statistically significant. Therefore, patients with unsatisfactory biopsy specimens can be reassured and counseled accordingly.

Oppenheimer, Jason D., E-mail: j-oppenheimer@md.northwestern.edu; Kasuganti, Deepa; Nayar, Ritu; Chrisman, Howard B.; Lewandowski, Robert J.; Nemcek, Albert A.; Ryu, Robert K., E-mail: rryu@nmff.or [Northwestern Medical Faculty Foundation, Department of Radiology (United States)

2010-08-15T23:59:59.000Z

204

Lifecycle Environments: A Retrospective View of the Contributions of Leon J.  

E-Print Network [OSTI]

Lifecycle Environments: A Retrospective View of the Contributions of Leon J. Osterweil Lori A@cs.umass.edu Abstract Throughout his career, Leon Osterweil has made significant contribu- tions that have impacted

Massachusetts at Amherst, University of

205

Retrospective Benefit-Cost Evaluation of U.S. DOE Geothermal...  

Office of Environmental Management (EM)

Technologies R&D Program Investments Retrospective Benefit-Cost Evaluation of U.S. DOE Geothermal Technologies R&D Program Investments: Impacts of a Cluster of Energy...

206

Landscape and Home: A Sense of Place in Wisconsin Gaylord Nelson Retrospective Lecture Series  

E-Print Network [OSTI]

Landscape and Home: A Sense of Place in Wisconsin Gaylord Nelson Retrospective Lecture Series be willing to launch this lecture series on "Landscape and Home, a Sense of Place in Wisconsin," they were

Sheridan, Jennifer

207

E-Print Network 3.0 - anal cancer retrospective Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: anal cancer retrospective Page: << < 1 2 3 4 5 > >> 1 Cell Cycle 3:6, 823-828; June 2004; 2004...

208

A reservoir management plan  

SciTech Connect (OSTI)

There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

Allis, R.G.

1989-06-16T23:59:59.000Z

209

Review of Nevada Site Office Criticality Safety Assessments at the Criticality Experiments Facility and Training Assembly for Criticality Safety and Appraisal of the Criticality Experiments Facility Startup Plan, October 2011  

Broader source: Energy.gov [DOE]

This report provides the results of an independent oversight review of criticality safety assessment activities conducted by the Department of Energy's (DOE) Nevada Site Office

210

Hanford Site Development Plan  

SciTech Connect (OSTI)

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

211

2030 OCARTS Plan Report  

E-Print Network [OSTI]

......................................Director of Planning & Program Development Pearlie Tiggs................................................................... Community Planner 2030 OCARTS Plan Report Table of Contents PART 1 INTRODUCTION........................................................................ 1 Federal Legislation.......................................................................... 1 Purpose of the Plan Report and Relationship to other Plan Documents............. 3 Organization of the Transportation Planning Process...

Association of Central Oklahoma Governments

212

11.479 Water and Sanitation Infrastructure Planning in Developing Countries, Spring 2004  

E-Print Network [OSTI]

Policy and planning for the provision of water supply and sanitation services in developing countries. Reviews available technologies, but emphasizes the planning and policy process, including economic, social, environmental, ...

Davis, Jennifer

213

STAKING SPACE : planning, public space, and visions of the subaltern in the context of Kabul  

E-Print Network [OSTI]

This thesis will review how public spaces in Kabul, Afghanistan will be affected by plans for development and formalization under proposed city plans. The core argument is that these processes of development under guises ...

Adina, Seema Ghizala

2012-01-01T23:59:59.000Z

214

Management Plan Supplement Yakima Subbasin Plan  

E-Print Network [OSTI]

#12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

215

Strategic Energy Planning Webinar  

Broader source: Energy.gov [DOE]

Attendees will learn about developing a strategic energy plan, identifying key aspects of successful energy planning, and using available information and resources, including archived webinars in...

216

Accidental Death & Dismemberment Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

217

Strategic Health Workforce Planning  

E-Print Network [OSTI]

May 11, 2013 ... Health workforce planning plays a key role in the United States and ... workforce plans should account for lags implied by training new...

2013-05-11T23:59:59.000Z

218

EMEF DMC EFS-95-004 GDP TURNOVER CONTINGENCY PLANNING POWER CONTRACTIN...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

111111111111111111111111 EMEF DMC EFS-95-004 GDP TURNOVER CONTINGENCY PLANNING POWER CONTRACTING OPTIONS This document is approved f()i puolic release per review by: er "-...

219

Develop an Institutional Change Action Plan for Sustainability  

Broader source: Energy.gov [DOE]

After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

220
Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

UNIV Halll Building Emergency Plan - Department of Mathematics ...  

E-Print Network [OSTI]

Jan 22, 2014 ... Campus Emergency Preparedness and Planning Office for review, distribution to the fire .... 7) Assist those who need help, but do not put yourself at risk attempting to ..... them inform emergency personnel of your location.

Physical Facilities

2014-01-30T23:59:59.000Z

222

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

223

Intermountain Province Subbasin Plan  

E-Print Network [OSTI]

, and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

224

Underground storage tank management plan  

SciTech Connect (OSTI)

The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

NONE

1994-09-01T23:59:59.000Z

225

Systematic Approach for Decommissioning Planning and Estimating  

SciTech Connect (OSTI)

Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

Dam, A. S.

2002-02-26T23:59:59.000Z

226

Progress Report on Power Division Work Plan  

E-Print Network [OSTI]

technologies Data development for the WECC/TEPPC 2020 transmission assessment 7 #12;Bonneville Resource of adequacy methodology Work with WECC and NERC on assessments 9 #12;Demand Response & Smart Grid Review Participation in WECC Transmission Expansion Planning Policy Committee (TEPPC) Provided PNW load forecast

227

National Ignition Facility Title II Design Plan  

SciTech Connect (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

228

FIRE Project Action Plan in Response to  

E-Print Network [OSTI]

. The project should review other mission statements from the Office of Science in order to understand better, the Next Generation Space Telescope, etc. The project will also solicit input from the science community1 FIRE Project Action Plan in Response to Next Step Options Program Advisory Committee Report (PAC1

229

SMART WATER GRID PLAN B TECHNICAL REPORT  

E-Print Network [OSTI]

SMART WATER GRID PLAN B TECHNICAL REPORT FALL 2014 PREPARED BY: OLGA MARTYUSHEVA IN PARTIAL demand linked to the global population increase. A Smart Water Grid (SWG) is a two-way real time network, and others. A review of the benefits of Smart Water Grids is presented in the context of water conservation

Julien, Pierre Y.

230

Coal development plans in southeast Asia  

SciTech Connect (OSTI)

The author reviews coal production and consumption over recent years in Indonesia, Thailand and the Philippines. Projections of coal supply and demand for these countries to 1995 are also shown. Over-ambitious plans have been announced during the past 5 years, which have mostly been revised downwards. An attempt is made to provide realistic figures.

Lootens, D.J.

1985-09-01T23:59:59.000Z

231

Brian Fitzpatrick Page 1 4/4/2007 SUSTAINABILITY PLAN  

E-Print Network [OSTI]

) is in the unique position to educate the next generation of the professional workforce in sustainable practicesBrian Fitzpatrick Page 1 4/4/2007 SUSTAINABILITY PLAN April 2005 #12;Brian Fitzpatrick Page 2 4/4/2007 DATE: AGENCY COORDINATOR: PHONE: EMAIL: This Sustainability Plan has been reviewed and approved

Massachusetts at Amherst, University of

232

Ark-Tex Area Regional Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. ARK-TEX AREA REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN Developed for: ARK-TEX COUNCIL OF GOVERNMENTS By: KFH Group, Incorporated In Association with: Kimley-Horn and Associates, Inc.................................................................................................................................1 PLAN PROCESS .............................................................................................................................2 REVIEW OF EXISTING SERVICES...

Ark-Tex Council of Governments

2006-11-30T23:59:59.000Z

233

Department of Recreation, Park and Tourism Sciences Academic Program Review  

E-Print Network [OSTI]

University). The review team is charged with evaluating the following a) the efficiency and effectiveness program (Professional Event Manager). Section 2 provides a description of the organizational context-financial plans, b) financial plans, and c) action plans for individual projects. The Department organizational

234

NIMH CRADAs Review and Approval Process  

E-Print Network [OSTI]

NIMH CRADAs Review and Approval Process Initiation · Principle Investigators (PIs) from both parties jointly develop a Research Plan (using NIH CRADA Subcommittee guidelines) and determine). · Collaborating party concurrently reviews CRADA boilerplate and contacts TDC with any questions or areas

Baker, Chris I.

235

WASC EDUCATIONAL EFFECTIVENESS REVIEW EDUCATIONAL EFFECTIVENESS APPROACH  

E-Print Network [OSTI]

of institutional review and planning within which we address the educational effectiveness of our programs. In our our students, our courses, and our programs to assure continued and enhanced educational vitalityWASC EDUCATIONAL EFFECTIVENESS REVIEW EDUCATIONAL EFFECTIVENESS APPROACH UC Santa Cruz ... ranked

California at Santa Cruz, University of

236

Refer to the Introduction pages for an explanation of the benefit plan charts. Page 1May 12, 2011  

E-Print Network [OSTI]

, coinsurance and deductibles information for your health plan. It does not list the exclusions and limitations the complete terms and conditions of your Health Net coverage. It is important for you to thoroughly review the EOC for your plan. Health Net HMO Plan Chart (NG) Plan 5KC 5KC 7/1/2011 PROFESSIONAL SERVICES Visit

Mullins, Dyche

237

Performance Demonstration Program Management Plan  

SciTech Connect (OSTI)

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organizations quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

238

65 Contingency Planning Issues CONTINGENCY PLANNING ISSUES  

E-Print Network [OSTI]

. The plan relies on a mixed strategy response to an energy shortage. The plan uses a free market approach to local jurisdic- tions, economic considerations, revisions to the California Energy Shortage Contingency multiple jurisdictions or agencies. LOCAL GOVERNMENT ASSISTANCE PROGRAM The purpose of the Energy

239

CPM's 20th Anniversary: A Statistical Retrospective Elena Yavorska Harris1  

E-Print Network [OSTI]

CPM's 20th Anniversary: A Statistical Retrospective Elena Yavorska Harris1 , Thierry Lecroq2, Lille and J.-V.Poncelet Lab, Moscow) and INRIA Lille ­ Nord Europe 1 Introduction This year the Annual, pp. 1­11, 2009. c Springer-Verlag Berlin Heidelberg 2009 #12;2 E.Y. Harris et al. Table 1. Locations

Lonardi, Stefano

240

MODIFICATION OF SHIRT BUTTONS FOR RETROSPECTIVE RADIATION DOSIMETRY AFTER A RADIOLOGICAL EVENT  

E-Print Network [OSTI]

Note MODIFICATION OF SHIRT BUTTONS FOR RETROSPECTIVE RADIATION DOSIMETRY AFTER A RADIOLOGICAL EVENT. Health Phys. 100(5):542­547; 2011 Key words: detector, thermoluminescent; dosimetry, person- nel, such as use of a radiological dispersal device (RDD or "dirty bomb"), an improvised nuclear device (IND

Brenner, David Jonathan

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Sea level rise implications on shoreline changes: expectations from a retrospective analysis  

E-Print Network [OSTI]

Sea level rise implications on shoreline changes: expectations from a retrospective analysis Gonéri de Recherche et de Formation en Calcul Scientifique (Cerfacs) Sea level rise is a major consequence level rise is up to 3 times the global mean rate (estimated as 3.5 mm per year since the early 1990s

Paris-Sud XI, Université de

242

Regulation as Retrospective Ethnography: Mobile Money and the Arts of Cash  

E-Print Network [OSTI]

r-~,. Regulation as Retrospective Ethnography: Mobile Money and the Arts of Cash Bill Maurer Often proscriptions regarding the disclosure of cerlain transactions, and multi-per- son sharing of money and mobiles, an account we might set alongside other fonns of data on use cases for mobile and money. It argues

Brody, James P.

243

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

Kosecka, Jana

244

Virginia Energy Plan (Virginia)  

Broader source: Energy.gov [DOE]

The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the states energy picture through an examination of the states primary energy...

245

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

246

Sustainabiliity Sustainability Plan  

E-Print Network [OSTI]

Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

Heller, Barbara

247

Hoisting & Rigging Lift Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 3 of 3 Guidelines for Generating a Rigging Sketch The lift plan required a rigging sketch or...

248

Retrospective radon progeny measurements through measurements of 210 activities on glass objects using stacked LR 115 detectors  

E-Print Network [OSTI]

Retrospective radon progeny measurements through measurements of 210 Po activities on glass objects 2 September 2008 PACS: 29.40 23.60 Keywords: Radon Radon progeny 210 Po Implantation Retrospective for determining 210 Po activity in glass surfaces after deposition of short-lived radon progeny. The sensitivities

Yu, K.N.

249

Training Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

250

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

Waste Management Group

2006-01-01T23:59:59.000Z

251

Business Planning Resources  

Broader source: Energy.gov [DOE]

Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

252

Greensburg Sustainable Comprehensive Plan  

High Performance Buildings Database

Greensburg, KS In October 2007, the architectural and planning firm, BNIM, was selected formally by the City of Greensburg, with support from the USDA, to prepare the first phase of a comprehensive master plan to rebuild the city, which provides a framework for the rebuilding of Greensburg based around the principles of economic, social and environmental sustainability. The BNIM Planning team presented the final draft of Greensburg's Comprehensive Plan to the City Council and to a public hearing on January 16, 2008.

253

Quality Planning Handbook VERSION 1.0 November 22, 1999, 1998  

E-Print Network [OSTI]

Report DQOs Data Quality Objectives GIS Geographic Information System MSR Management Systems Review Performance Evaluation QA Quality Assurance QC Quality Control QSMP Quality Systems Management Plan PQMP Program Quality Management Plans QIWP Quality Integrated Work Plan QSSC Quality Systems Science Center R

254

Multiperiod Refinery Planning Optimization  

E-Print Network [OSTI]

Multiperiod Refinery Planning Optimization with Nonlinear CDU Models Abdulrahman Alattas, Advisor #12;Refinery Planning Model Development 2 Extension to Multiperiod Planning #12;3 Multiperiod Refinery: refinery configuration Determine · What crude oil to process and in which time period? · The quantities

Grossmann, Ignacio E.

255

University Libraries Technology Plan  

E-Print Network [OSTI]

Libraries Bowling Green State University #12;Table of Contents Introduction ..................................................................19 Page 2 of 19 Technology Plan, 2003-2005 University Libraries Bowling Green State University #12University Libraries Technology Plan 2003-2005 Page 1 of 19 Technology Plan, 2003-2005 University

Moore, Paul A.

256

University of Operations Plan  

E-Print Network [OSTI]

Management Plan Office of Campus and Public Safety University of Delaware Critical Incident Management Plan Management Plan Office of Campus and Public Safety - 4 - University of Delaware Critical Incident Management and Public Safety - 5 - County of New Castle CD-30 911 Center/Communications CD-31 Department of Police CD-32

Firestone, Jeremy

257

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

Kosecka, Jana

258

Corporate and Business Plan  

E-Print Network [OSTI]

Corporate and Business Plan 2010-2011 #12;Main addresses Forest Research Alice Holt Lodge Farnham Research's Business Plan 2010-2011 ..........................12 Table Contents Table 1 - Income This Corporate and Business Plan sets out FR's aims and strategic objectives. It describes the Key Performance

259

Peer Review Summary Document (12/20/2011)  

E-Print Network [OSTI]

Peer Review Summary Document (12/20/2011) Peer Review Plan http://www.usgs.gov/peer_review/docs/white-mesa_uranium Migration of Radionuclides and Trace Elements from the White Mesa Uranium Mill to the Ute Mountain Ute with the USGS Utah Water Science Center. MS degree in Geology from the University of Utah followed by 22 years

Torgersen, Christian

260

Business Plans for Agricultural Producers  

E-Print Network [OSTI]

Natural resources Z Strengths, weaknesses, opportunities ? and threats (SWOT) Mission statement ? Objectives and goals ? Production plan ? Financial plan ? Market plan ? Legal and liability issues ? Insurance ? Succession and estate planning...

McCorkle, Dean; Bevers, Stan

2008-10-17T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

262

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

263

Independent Oversight Follow-up Review of Activity Level Implementation of Radiation Controls and Radiological Work Planning at the Materials and Fuels Complex of the Idaho Site, January 2014  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: AlternativeEnvironment, Safety andGeothermalGreen link to facebookCapitalof theFollow-Up Review of

264

Operating plan FY 1998  

SciTech Connect (OSTI)

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

265

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

266

Document Reviews  

Broader source: Energy.gov [DOE]

The Office of Document Reviews, within the Office of Health, Safety and Security information and document declassification efforts promote the release of information needed by an informed citizenry...

267

Waste Management Quality Assurance Plan  

SciTech Connect (OSTI)

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

268

Vehicle Technologies Office Merit Review 2014: Pennsylvania Partnership for Promoting Natural Gas Vehicles  

Broader source: Energy.gov [DOE]

Presentation given by Delaware Valley Regional Planning Commission at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

269

Report of the Blue Ribbon Panel on the Review of the Radiation...  

Broader source: Energy.gov (indexed) [DOE]

October 11, 1995 This report summarizes the findings of the Blue Ribbon Panel's review of the RERF scientific projects and future research plans The report recommended that the...

270

Estimated cumulative radiation dose from PET/CT in children with malignancies: a 5-year retrospective review  

E-Print Network [OSTI]

EE, Thomas SR et al (2002) MIRD dose estimate report No. 19:of a mathematical phantom (MIRD phantom) by a range of CTselect using a diagram of the MIRD phantom provided. Based

2010-01-01T23:59:59.000Z

271

Shai Agassi's story of his evolving personal interest in energy issues, and the evolv-ing business plan of his electric vehicle company, Better Place, provides an impor-  

E-Print Network [OSTI]

plan of his electric vehicle company, Better Place, provides an impor- tant lens on the pace short-lived efforts at developing electric vehicles. All this can be seen, in retrospect, as a clarion electric vehicles--is notable and challenging at the same time. The benefit of pure EV technology

Kammen, Daniel M.

272

Waste minimization and pollution prevention awareness plan. Revision 1  

SciTech Connect (OSTI)

The purpose of this plan is to document Lawrence Livermore National Laboratory (LLNL) projections for present and future waste minimization and pollution prevention. The plan specifies those activities and methods that are or will be used to reduce the quantity and toxicity of wastes generated at the site. It is intended to satisfy Department of Energy (DOE) requirements. This Waste Minimization and Pollution Prevention Awareness Plan provides an overview of projected activities from FY 1994 through FY 1999. The plans are broken into site-wide and problem-specific activities. All directorates at LLNL have had an opportunity to contribute input, estimate budgets, and review the plan. In addition to the above, this plan records LLNL`s goals for pollution prevention, regulatory drivers for those activities, assumptions on which the cost estimates are based, analyses of the strengths of the projects, and the barriers to increasing pollution prevention activities.

Not Available

1994-07-01T23:59:59.000Z

273

IDC Integrated Master Plan.  

SciTech Connect (OSTI)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

274

National conference on integrated resource planning: Proceedings  

SciTech Connect (OSTI)

Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

Not Available

1991-01-01T23:59:59.000Z

275

National conference on integrated resource planning: Proceedings  

SciTech Connect (OSTI)

Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

Not Available

1991-12-31T23:59:59.000Z

276

CROSSFLOW FILTRATON: LITERATURE REVIEW  

SciTech Connect (OSTI)

As part of the Filtration task EM-31, WP-2.3.6, which is a joint effort between Savannah River National Laboratory (SRNL) and the Pacific Northwest National Laboratory (PNNL), tests were planned to evaluate crossflow filtration in order to the improve the use of existing hardware in the waste treatment plants at both the Department of Energy (DOE) Savannah River Site (SRS) and Hanford Site. These tests included experiments to try different operating conditions and additives, such as filter aids, in order to create a more permeable filter cake and improve the permeate flux. To plan the SRNL tests a literature review was performed to provide information on previous experiments performed by DOE laboratories, and by academia. This report compliments PNNL report (Daniel, et al 2010), and is an attempt to try and capture crossflow filtration work performed in the past that provide a basis for future testing. However, not all sources on crossflow filtration could be reviewed due to the shear volume of information available. In this report various references were examined and a representative group was chosen to present the major factors that affect crossflow filtration. The information summarized in this review contains previous operating conditions studied and their influence on the rate of filtration. Besides operating conditions, other attempted improvements include the use of filter aids, a pre-filtration leaching process, the backpulse system, and various types of filter tubes and filter coatings. The results from past research can be used as a starting point for further experimentation that can result in the improvement in the performance of the crossflow filtration. The literature reviewed in this report indicates how complex the crossflow issues are with the results of some studies appearing to conflict results from other studies. This complexity implies that filtration of mobilized stored waste cannot be explained in a simple generic sense; meaning an empirical model develop from one waste-filter combination will more than likely not be applicable to another combination. It appears that filtration performance varies as wide as the range of the types of slurry wastes that exist. However, conclusions can be elicited from existing information so that filter performance can be better understood, and hopefully improved. Those conclusions and recommendations for the planned tests are listed.

Duignan, M.

2011-01-01T23:59:59.000Z

277

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

278

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

279

Individual Development Plan  

Broader source: Energy.gov [DOE]

To be effective, training decisions made at the organizational and departmental levels must be informed by the needs of the individual. An individual development plan (IDP) is cooperatively...

280

Microsoft Word - prjct planning  

Broader source: Energy.gov (indexed) [DOE]

activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies,...

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

MITG Test Plan  

SciTech Connect (OSTI)

The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

Eck, Marshall B.

1981-08-01T23:59:59.000Z

282

Community Relations Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public...

283

Climate Action Plan (Virginia)  

Broader source: Energy.gov [DOE]

Governor Timothy M. Kaine established the Governor's Commission on Climate Change in December 2007. The commission prepared a plan for Virginia that identified ways to reduce greenhouse gas...

284

Climate Action Plan (Kentucky)  

Broader source: Energy.gov [DOE]

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

285

State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

286

LBNL Institutional Plan, FY 1996--2001. Draft  

SciTech Connect (OSTI)

The FY 1996-2001 Institutional Plan provides an overview of the Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It also summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.

NONE

1995-06-01T23:59:59.000Z

287

1987 DOE review: First collider run operation  

SciTech Connect (OSTI)

This review covers the operations of the first run of the 1.8 TeV superconducting super collider. The papers enclosed cover: PBAR source status, fixed target operation, Tevatron cryogenic reliability and capacity upgrade, Tevatron Energy upgrade progress and plans, status of the D0 low beta insertion, 1.8 K and 4.7 K refrigeration for low-..beta.. quadrupoles, progress and plans for the LINAC and booster, near term and long term and long term performance improvements.

Childress, S.; Crawford, J.; Dugan, G.; Edwards, H.; Finley, D.A.; Fowler, W.B.; Harrison, M.; Holmes, S.; Makara, J.N.; Malamud, E.

1987-05-01T23:59:59.000Z

288

Associate at the American Planning Association. Planning for Solar Energy  

E-Print Network [OSTI]

There is a growing desire among communities to become more sustainable. Energy conservation and renewable energy production (including solar energy) play a significant role in community sustainability goals. Public officials and engaged citizens have many opportunities throughout the planning process to help support and advance solar energy initiatives in their communities. LONG-RANGE COMMUNITY VISIONING AND GOAL SETTING Community visioning is often the first step in developing any type of community plan, for establishing new standards, policies, and incentives, for doing development work, and for making public investment decisions. Whether part of a planning process or on its own, visioning is an important first chance to identify new opportunities and prioritiesincluding those related to solar energy. Planners often conduct visioning exercises that produce a communitys long-term goals and objectives. By expressing their views of renewable energy generation during these visioning exercises (including responding to surveys and participating in visioning meetings), citizens enable planners to gauge the level of awareness and importance of solar energy in the community. Planners use this information to develop policies and action items for the community. Once a community agrees upon its long-range goals and objectives, municipal officials should look to them when reviewing development proposals, making budget decisions, and performing other related tasks. Both citizens and public officials should use these visioning meetings to discuss how solar energy is connected to other community goals and values and how solar energy could help achieve other community goals. A PV System installed on a residence. (Photo credit:

This Pas; Quicknotes Erin Musiol

289

Radiological Work Planning and Procedures  

E-Print Network [OSTI]

Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

Kurtz, J E

2000-01-01T23:59:59.000Z

290

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

291

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Integrated accessibility strategy and design Legibility Integrated activity Shared spaces Strategy 1: Policy Pedestrian planning as constituency buildingIntegrated activity study Inclusive road designation WikiPlaces pedestrian network mapping Vernacular placemaking and Asian shared street design Pedestrian planning as constituency building

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

292

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600-2006-014 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION Jackalyne Pfannenstiel Chairman James D Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared

293

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

294

Hanford facility contingency plan  

SciTech Connect (OSTI)

The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

Sutton, L.N.

1996-07-01T23:59:59.000Z

295

Supporting Document Strategic Plan  

E-Print Network [OSTI]

1 Supporting Document Strategic Plan 20132020 #12;2 Supporting Document Strategic Plan 2013 more critical to the University's future than was the case in 2005. The purpose of this document are summarised via a SWOT analysis in Appendix 1. This document should therefore be read in conjunction

Auckland, University of

296

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

well because of its people, business market and industry; it is always a good idea to be on the lookout for new markets and clients in other industries and markets. Transmission planning has always been a steady market for the electrical industry...

Tu, Linh

2006-12-15T23:59:59.000Z

297

Transportation Institutional Plan  

SciTech Connect (OSTI)

This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

Not Available

1986-08-01T23:59:59.000Z

298

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

299

South Texas Planning Region Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December.................................................................................................................................1 PLAN PROCESS .............................................................................................................................3 GOALS AND OBJECTIVES...

South Texas Development Council Economic Development Program

2006-12-15T23:59:59.000Z

300

The Sellafield Plan - 12458  

SciTech Connect (OSTI)

The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear missions in West Cumbria. (authors)

Irving, Iain [Stakeholder Relations Director, Sellafield Ltd, Cumbria (United Kingdom)

2012-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN  

E-Print Network [OSTI]

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

Florida, University of

302

Argonne National Laboratory institutional plan FY 2001--FY 2006.  

SciTech Connect (OSTI)

This Institutional Plan describes what Argonne management regards as the optimal future development of Laboratory activities. The document outlines the development of both research programs and support operations in the context of the nation's R and D priorities, the missions of the Department of Energy (DOE) and Argonne, and expected resource constraints. The Draft Institutional Plan is the product of many discussions between DOE and Argonne program managers, and it also reflects programmatic priorities developed during Argonne's summer strategic planning process. That process serves additionally to identify new areas of strategic value to DOE and Argonne, to which Laboratory Directed Research and Development funds may be applied. The Draft Plan is provided to the Department before Argonne's On-Site Review. Issuance of the final Institutional Plan in the fall, after further comment and discussion, marks the culmination of the Laboratory's annual planning cycle. Chapter II of this Institutional Plan describes Argonne's missions and roles within the DOE laboratory system, its underlying core competencies in science and technology, and six broad planning objectives whose achievement is considered critical to the future of the Laboratory. Chapter III presents the Laboratory's ''Science and Technology Strategic Plan,'' which summarizes key features of the external environment, presents Argonne's vision, and describes how Argonne's strategic goals and objectives support DOE's four business lines. The balance of Chapter III comprises strategic plans for 23 areas of science and technology at Argonne, grouped according to the four DOE business lines. The Laboratory's 14 major initiatives, presented in Chapter IV, propose important advances in key areas of fundamental science and technology development. The ''Operations and Infrastructure Strategic Plan'' in Chapter V includes strategic plans for human resources; environmental protection, safety, and health; site and facilities; security, export control, and counterintelligence; information management; communications, outreach, and community affairs; performance-based management; and productivity improvement and overhead cost reduction. Finally, Chapter VI provides resource projections that are a reasonable baseline for planning the Laboratory's future.

Beggs, S.D.

2000-12-07T23:59:59.000Z

303

Energy Efficiency Market Sustainable Business Planning | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning, a presentation...

304

2012 DOE Strategic Sustainability Performance Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

305

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and  

E-Print Network [OSTI]

SAFETY COMMITTEE ANNUAL PLAN TEMPLATE The safety committee and the unit administration work together in promoting the unit's safety and health efforts. The Safety Committee Annual Plan provides. Supervisors can review the plan with new employees during their safety orientation. 3. Safety committee

Collins, Gary S.

306

Public affairs plan  

SciTech Connect (OSTI)

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

Not Available

1994-09-01T23:59:59.000Z

307

Human-system interface design review guideline -- Reviewer`s checklist: Final report. Revision 1, Volume 2  

SciTech Connect (OSTI)

NUREG-0700, Revision 1, provides human factors engineering (HFE) guidance to the US Nuclear Regulatory Commission staff for its: (1) review of the human system interface (HSI) design submittals prepared by licensees or applications for a license or design certification of commercial nuclear power plants, and (2) performance of HSI reviews that could be undertaken as part of an inspection or other type of regulatory review involving HSI design or incidents involving human performance. The guidance consists of a review process and HFE guidelines. The document describes those aspects of the HSI design review process that are important to the identification and resolution of human engineering discrepancies that could adversely affect plant safety. Guidance is provided that could be used by the staff to review an applicant`s HSI design review process or to guide the development of an HSI design review plan, e.g., as part of an inspection activity. The document also provides detailed HFE guidelines for the assessment of HSI design implementations. NUREG-0700, Revision 1, consists of three stand-alone volumes. Volume 2 is a complete set of the guidelines contained in Volume 1, Part 2, but in a checklist format that can be used by reviewers to assemble sets of individual guidelines for use in specific design reviews. The checklist provides space for reviewers to enter guidelines evaluations and comments.

NONE

1996-06-01T23:59:59.000Z

308

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

309

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

310

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

311

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

312

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

313

Planning for Years to Come  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

314

Transition Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

315

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning  

E-Print Network [OSTI]

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning George into a microphone. Over thirteen hours of inter- action have been collected and transcribed (see (Gross, Allen

Ferguson, George

316

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

317

Developing a Marketing Plan  

E-Print Network [OSTI]

Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

2009-03-02T23:59:59.000Z

318

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

319

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Rukmana, Deden. Street Vendors and Planning in IndonesianYatmo, Yandi Andri. Street Vendors as 'Out of Place' UrbanYatmo, Yandi Andri. Street Vendors as 'Out of Place' Urban

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

320

CURRICULUM VITAE RESEARCH PLAN  

E-Print Network [OSTI]

CURRICULUM VITAE & RESEARCH PLAN Erik Schwartz Sørensen Ph. D. Theoretical Condensed Matter Physics Contents Curriculum vitae 3 Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Recent Invited Talks 21 Referees 22 #12; Erik Sørensen February 19, 2001 3 Curriculum vitae

Sørensen, Erik S.

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Constraints and AI Planning  

E-Print Network [OSTI]

Tackling real-world problems often requires to take various types of constraints into account. Such constraint types range from simple numerical comparators to complex resources. This article describes how planning techniques ...

Nareyek, A; Freuder, E C; Fourer, R; Giunchiglia, R P; Kautz, H; Rintanen, J; Tate, Austin

2005-01-01T23:59:59.000Z

322

Strategic Plan: Implementation and  

E-Print Network [OSTI]

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

Nguyen, Danh

323

Business Entity Planning  

E-Print Network [OSTI]

There are a number of ways farm and ranch businesses can be structured, including partnerships, corporations, limited liability companies, and others. This publication explains how the structure of a business affects estate planning, management...

Thompson, Bill; Hayenga, Wayne

2008-10-10T23:59:59.000Z

324

Planning a Prescribed Burn  

E-Print Network [OSTI]

This leaflet explains how to plan for adequate fuel for a prescribed burn, control the fire, notify the proper authority, manage the burn itself, and conduct follow-up management. A ranch checklist for prescribed burning is included....

Hanselka, C. Wayne

2009-04-01T23:59:59.000Z

325

Technical Planning Basis  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

2007-07-11T23:59:59.000Z

326

Climate Action Plan (Maine)  

Broader source: Energy.gov [DOE]

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

327

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

328

Retrospection of Chernobyl nuclear accident for decision analysis concerning remedial actions in Ukraine  

SciTech Connect (OSTI)

It is considered the efficacy of decisions concerning remedial actions when of-site radiological monitoring in the early and (or) in the intermediate phases was absent or was not informative. There are examples of such situations in the former Soviet Union where many people have been exposed: releases of radioactive materials from 'Krasnoyarsk-26' into Enisey River, releases of radioactive materials from 'Chelabinsk-65' (the Kishtim accident), nuclear tests at the Semipalatinsk Test Site, the Chernobyl nuclear accident etc. If monitoring in the early and (or) in the intermediate phases is absent the decisions concerning remedial actions are usually developed on the base of permanent monitoring. However decisions of this kind may be essentially erroneous. For these cases it is proposed to make retrospection of radiological data of the early and intermediate phases of nuclear accident and to project decisions concerning remedial actions on the base of both retrospective data and permanent monitoring data. In this Report the indicated problem is considered by the example of the Chernobyl accident for Ukraine. Their of-site radiological monitoring in the early and intermediate phases was unsatisfactory. In particular, the pasture-cow-milk monitoring had not been made. All official decisions concerning dose estimations had been made on the base of measurements of {sup 137}Cs in body (40 measurements in 135 days and 55 measurements in 229 days after the Chernobyl accident). For the retrospection of radiological data of the Chernobyl accident dynamic model has been developed. This model has structure similar to the structure of Pathway model and Farmland model. Parameters of the developed model have been identified for agricultural conditions of Russia and Ukraine. By means of this model dynamics of 20 radionuclides in pathways and dynamics of doses have been estimated for the early, intermediate and late phases of the Chernobyl accident. The main results are following: - During the first year after the Chernobyl accident 75-93% of Commitment Effective Dose had been formed; - During the first year after the Chernobyl accident 85-90% of damage from radiation exposure had been formed. During the next 50 years (the late phase of accident) only 10-15% of damage from radiation exposure will have been formed; - Remedial actions (agricultural remedial actions as most effective) in Ukraine are intended for reduction of the damage from consumption of production which is contaminated in the late phase of accident. I.e. agricultural remedial actions have been intended for minimization only 10 % of the total damage from radiation exposure; - Medical countermeasures can minimize radiation exposure damage by an order of magnitude greater than agricultural countermeasures. - Thus, retrospection of nuclear accident has essentially changed type of remedial actions and has given a chance to increase effectiveness of spending by an order of magnitude. This example illustrates that in order to optimize remedial actions it is required to use data of retrospection of nuclear accidents in all cases when monitoring in the early and (or) intermediate phases is unsatisfactory. (author)

Georgievskiy, Vladimir [Russian Research Center 'Kurchatov Insitute', Kurchatov Sq., 1, 123182 Moscow (Russian Federation)

2007-07-01T23:59:59.000Z

329

Environmental implementation plan  

SciTech Connect (OSTI)

In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

Peterson, G.L.

1994-10-04T23:59:59.000Z

330

Metropolitan Transportation Plan 2035  

E-Print Network [OSTI]

Adopted by the Tyler Area MPO Policy Committee December 4, 2009 METROPOLITAN TRANSPORTATION PLAN 2035 Revised April 22, 2010 Adopted by the Tyler Area MPO Policy Committee December 4, 2009 Amended/Revised April 22, 2010 Prepared by: Bucher..., Willis, and Ratliff Corporation 1828 East Southeast Loop 323, Suite 202 Tyler, Texas 75701 903.581.7844 This Document Serves as an Update to the Tyler Area Metropolitan Transportation Plan 2030. Portions of that Document were Unchanged and Appear...

Tyler Area Metropolitan Planning Organization

2009-12-04T23:59:59.000Z

331

Public affairs plan  

SciTech Connect (OSTI)

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies.

NONE

1995-09-01T23:59:59.000Z

332

Hot Springs Metropolitan Planning Organization 2030 Long Range Transportation Plan  

E-Print Network [OSTI]

Hot Springs Area Metropolitan Planning Organization 100 Broadway Terrace Hot Springs, Arkansas 71901 Adopted November 3, 2005 HSA-MPO 2030 LRTPii Participating Agencies Garland County Hot... Federal Highway Administration Federal Transit Administration 2030 Long Range Transportation Plan for the Hot Springs Area Metropolitan Planning Organization This LRTP has been funded with federal Metropolitan Planning (PL) funds through...

Hot Springs Metropolitan Planning Organization

2005-11-03T23:59:59.000Z

333

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

334

OSU Bicycle Plan 2/10 OSU Bicycle Plan  

E-Print Network [OSTI]

OSU Bicycle Plan 2/10 DRAFT OSU Bicycle Plan Introduction Goals and Performance Measures (statistics and data points) Bicycle Network (circulation and parking) Bicycle Programs (incentives, outreach, education and enforcement) Improvement Plan #12;OSU Bicycle Plan 2/10 Introduction The 2010 Oregon State

Escher, Christine

335

Charmonium Review  

E-Print Network [OSTI]

During the last few years there has been a renaissance in charm and charmonium spectroscopy with higher precision measurements at the $\\psi^{'}$ and $\\psi(3770)$ coming from BESII and CLEOc and many new discoveries coming from B-factories. In this paper, I will review the status of $\\psi(3770)$ and below.

Frederick A. Harris

2006-10-06T23:59:59.000Z

336

Pulsed Power Peer Review Committee Report  

SciTech Connect (OSTI)

In 1993, the Government Performance and Results Act (GPRA, PL 103-62) was enacted. GPRA, which applies to all federal programs, has three components: strategic plans, annual performance plans, and metrics to show how well annual plans are being followed. As part of meeting the GRPA requirement in FY2000, a 14-member external peer review panel (the Garwin Committee) was convened on May 17-19, 2000 to review Sandia National Laboratories' Pulsed Power Programs as a component of the Performance Appraisal Process negotiated with the Department of Energy (DOE). The scope of the review included activities in inertial confinement fission (ICF), weapon physics, development of radiation sources for weapons effects simulation, x-ray radiography, basic research in high energy density physics (HEDP), and pulsed power technology research and development. In his charge to the committee, Jeffrey Quintenz, Director of Pulsed Power Sciences (1600) asked that the review be based on four criteria (1) quality of science, technology, and engineering, (2) programmatic performance, management, and planning, (3) relevance to national needs and agency missions, and (4) performance in the operation and construction of major research facilities. In addition, specific programmatic questions were posed by the director and by the DOE-Defense Programs (DP). The accompanying report, produced as a SAND document, is the report of the committee's findings.

BLOOMQUIST,DOUGLAS D.

2000-12-01T23:59:59.000Z

337

Year in Review 2007 GoddardView  

E-Print Network [OSTI]

Year in Review 2007 GoddardView National Aeronautics and Space Administration www.nasa.gov Volume 4, to stunning images from the highest-resolution satellite data products ever realized, to a visit from Security staff did a marvelous job in planning and coordinating the efforts of at least six different

Christian, Eric

338

Rulison Monitoring Plan  

SciTech Connect (OSTI)

The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

None

2010-07-01T23:59:59.000Z

339

Independent Scientific Review Panel for the Northwest Power & Conservation Council  

E-Print Network [OSTI]

Scientific Review Panel (ISRP) conduct a review of the Spring Chinook Hatchery Program of the Lower Snake River Compensation Plan (LSRCP). The LSRCP was authorized by Congress in 1976 to conduct fish hatchery operations to produce a return of 58,700 adult spring/summer Chinook salmon above Lower Granite Dam after

340

COLORADO STATE UNIVERSITY Research Integrity & Compliance Review Office (RICRO)  

E-Print Network [OSTI]

COLORADO STATE UNIVERSITY Research Integrity & Compliance Review Office (RICRO) Assistant of the Research Integrity and Compliance Review Office (RICRO) is responsible for a broad range of duties to the campus community and visitors to campus. #12; Ability to successfully plan and prepare for as well as set

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Independent Scientific Review Panel for the Northwest Power & Conservation Council  

E-Print Network [OSTI]

Independent Scientific Review Panel for the Northwest Power & Conservation Council 851 SW 6 th the Idaho Department of Fish and Game's Master Plan for the Snake River Sockeye Program (#2007's responses to the Step 1 scientific review elements specified by the Council. Although this is a Step 1

342

Forestry Commission England Corporate Plan  

E-Print Network [OSTI]

Forestry Commission England Corporate Plan 2011-15 This is the Corporate Plan for the Forestry Commission in England. It is one of a suite of plans including those for Forestry Commission (GB) and Forest Research. Page 1Forestry Commission England Corporate Plan 2011-15 #12;Page 2Forestry Commission England

343

Windward Community College Strategic Plan  

E-Print Network [OSTI]

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

344

UNL CAMPUS & LANDSCAPE MASTER PLANS  

E-Print Network [OSTI]

are to both support the upkeep and maintenance of existing landscapes on campus and to support the designPLAN BIG UNL CAMPUS & LANDSCAPE MASTER PLANS NOVEMBER 2013 #12;#12;PLAN BIG ARCHITECTURAL AND LANDSCAPE GUIDELINES #12;4 #12;5 TABLE OF CONTENTS INTRODUCTION Purpose and Introduction 6 The Plan Big

Farritor, Shane

345

Optimal Interdiction of Attack Plans Joshua Letchford  

E-Print Network [OSTI]

Economics, Security, Algorithms Keywords Game theory, security, planning, plan interdiction 1. INTRODUCTION

Vorobeychik, Eugene

346

CASL Validation Data: An Initial Review  

SciTech Connect (OSTI)

The study aims to establish a comprehensive view of data needed for supporting implementation of the Consortium of Advanced Simulation of LWRs (CASL). Insights from this review (and its continual refinement), together with other elements developed in CASL, should provide the foundation for developing the CASL Validation Data Plan (VDP). VDP is instrumental to the development and assessment of CASL simulation tools as predictive capability. Most importantly, to be useful for CASL, the VDP must be devised (and agreed upon by all participating stakeholders) with appropriate account for nature of nuclear engineering applications, the availability, types and quality of CASL-related data, and novelty of CASL goals and its approach to the selected challenge problems. The initial review (summarized on the January 2011 report version) discusses a broad range of methodological issues in data review and Validation Data Plan. Such a top-down emphasis in data review is both needed to see a big picture on CASL data and appropriate when the actual data are not available for detailed scrutiny. As the data become available later in 2011, a revision of data review (and regular update) should be performed. It is expected that the basic framework for review laid out in this report will help streamline the CASL data review in a way that most pertinent to CASL VDP.

Nam Dinh

2011-01-01T23:59:59.000Z

347

Ocean Studies Board annual report 1989 and future plans  

SciTech Connect (OSTI)

The major activities of the Ocean Studies Board of the National Research Council for 1989 are reviewed. The following are discussed: the Navy Panel, the CO2 Panel, the Committee on the Ocean's Role in Global Change, the Committee on the Coastal Ocean, the Workshop on Issues of U.S. Marine Fisheries, and the Continental Margins Workshop Committee. Future plans are covered.

Not Available

1990-01-01T23:59:59.000Z

348

Experimental Test Plan DOE Tidal and River Reference Turbines  

SciTech Connect (OSTI)

Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

2012-09-01T23:59:59.000Z

349

Facilities Division ISM Plan 2009 1.0 Purpose  

E-Print Network [OSTI]

://www.lbl.gov/ehs/pub3000/ Operating & Quality Management Plan, Rev. 9 LBNL/PUB-3111 (http://www.7 Student Safety 3.8 Division Safety Coordinator 3.9. Safety Review Committee Member 3.10 Building Manager.g.,HMS system) 5.2 Work Requiring Specific Authorization (e.g., list Group JHAs, point to system) 6

350

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

351

Optimal Model-Based Production Planning  

E-Print Network [OSTI]

1 Optimal Model-Based Production Planning for Refinery Operation Abdulrahman Alattas Advisor;2 Outline Introduction Problem Statement Refinery Planning Model Development LP Planning Models NLP Planning Models Conclusion #12;3 Introduction Refinery production planning models Optimizing refinery

Grossmann, Ignacio E.

352

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

353

One-on-one guidance from Fidelity. We can help make your future plans possible.  

E-Print Network [OSTI]

One-on-one guidance from Fidelity. We can help make your future plans possible. Fidelity has over institutions, we're committed to helping you meet your goals. Matt Waterloo, your dedicated Fidelity Workplace Planning and Guidance Consultant, is ready to help you: · Manage your retirement savings goals · Review

Firestone, Jeremy

354

Retrospective Analysis of Communication Events - Understanding the Dynamics of Collaborative Multi-Party Discourse  

SciTech Connect (OSTI)

This research is aimed at understanding the dynamics of collaborative multi-party discourse across multiple communication modalities. Before we can truly make sig-nificant strides in devising collaborative communication systems, there is a need to understand how typical users utilize com-putationally supported communications mechanisms such as email, instant mes-saging, video conferencing, chat rooms, etc., both singularly and in conjunction with traditional means of communication such as face-to-face meetings, telephone calls and postal mail. Attempting to un-derstand an individuals communications profile with access to only a single modal-ity is challenging at best and often futile. Here, we discuss the development of RACE Retrospective Analysis of Com-munications Events a test-bed prototype to investigate issues relating to multi-modal multi-party discourse.

Cowell, Andrew J.; Haack, Jereme N.; McColgin, Dave W.

2006-06-08T23:59:59.000Z

355

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

356

Energy Organizational Planning  

SciTech Connect (OSTI)

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

357

2013 Annual Merit Review Results Report - Merit Review Attendees...  

Broader source: Energy.gov (indexed) [DOE]

3 Annual Merit Review Results Report - Merit Review Attendees 2013 Annual Merit Review Results Report - Merit Review Attendees Merit review of DOE Vehicle Technologies research...

358

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

359

Strategic Planning for Landowners  

E-Print Network [OSTI]

Strategic Planning for Landowners Risk Management E-146 RM3-12.0 09-08 *Assistant Professor and Extension Economist?Management, and Extension Specialist?Risk Management, The Texas A&M System Strategic planning is a process that provides direction... the bottom up. Managers are also responsible for Jason L. Johnson and Wade Polk* 2 carrying out those required daily tasks. Land- owners are often both manager and employee, which demands a combination of vision and technical aptitude. Steps for Setting...

Johnson, Jason; Polk, Wade

2008-09-16T23:59:59.000Z

360

Performance Management Plan  

SciTech Connect (OSTI)

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Guam Strategic Energy Plan  

SciTech Connect (OSTI)

Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

Conrad, M. D.

2013-07-01T23:59:59.000Z

362

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

363

Career Planning - SRSCRO  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearchCASL Symposium: CelebratingMissionat|planning Career Planning

364

Peer Review Plan Date: 05/14/2013  

E-Print Network [OSTI]

uses, Atwood, Leesville, and Tappan Lakes may be used as a source of water for hydraulic fracturing. Because of the interest in hydraulic fracturing, this USGS report likely will be scrutinized by parties in the Muskingum Watershed both opposed to and in favor of hydraulic fracturing. Impact of Dissemination

Torgersen, Christian

365

City of Dallas- Green Building Expedited Plan Review  

Broader source: Energy.gov [DOE]

The Dallas Green Building Program establishes expedited permitting for green buildings. During Phase 1 of the program (October 1, 2009 - September 30, 2011), applicants must provide a checklist...

366

Review of the Portsmouth Gaseous Diffusion Plant Work Planning...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

William Eckroade John Boulden Thomas Staker William Miller Michael Kilpatrick George Armstrong Robert Nelson Independent Oversight Site Lead Joseph P. Drago Independent Oversight...

367

Article in Review, January 2005 Journal: Environment & Planning B'  

E-Print Network [OSTI]

) model. In order to test the best possible spatial configuration of the algorithm and its efficiency University, Department of Forestry and Natural Resources. E-mail: bpijanow@purdue.edu 3 Krannert Business 1 Assessing Multi-Agent Parcelization Performance in the MABEL Simulation Model using Monte Carlo

368

Peer Review Plan Date: 8/20/2012  

E-Print Network [OSTI]

of smallholder timber production under expanding Aa palm production in the Amazon Estuary. Subject and Purpose to its primary land use alternative in the Amazon Estuary, Aa palm fruit production. Net Present Value

Torgersen, Christian

369

Office of Enterprise Assessments Targeted Review of Work Planning...  

Office of Environmental Management (EM)

that includes thorough understanding of the technical basis for the work and a search for failure modes that can cause accidents to occur. Section 5.3 of Manual 471012...

370

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

Approach, for Determining the Effects of Hatchery Reforms on Extinction Risk and Recovery ................................................................................................................................. 2 Proposal 10: A Tool for Evaluating Risks and Benefits of Reform Actions in Hatchery Programs (WDFW)................................................................................................................................3 Proposal 13: Analytical Approach for Determination of Effects of Hatchery Reform on Extinction

371

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

Approach, for Determining the Effects of Hatchery Reforms on Extinction Risk and Recovery ................................................................................................................................. 2 Proposal 10: A Tool for Evaluating Risks and Benefits of Reform Actions in Hatchery Programs (WDFW)................................................................................................................................2 Proposal 13: Analytical Approach for Determination of Effects of Hatchery Reform on Extinction

372

Peer Review Plan Date: 7/23/14  

E-Print Network [OSTI]

--A Call for Action. Subject and Purpose: The 3D Elevation Program (3DEP) initiative includes a call for action to accelerate the collection of remotely sensed high-resolution data of two types: (1) high States, and a sample of private sector companies and Tribal and local governments. As proposed, the 3DEP

373

Conventional Transportation Planning Models: Review and Prospects for Alternatives  

E-Print Network [OSTI]

of 1964 ($ 375 m) Highway Oriented 1970s Oil Crisis, Back to the City Transit Oriented (Urban Mass-Aid Highway Act of 1956) 1960s Fiscal Crisis, Urban Exodus Suburbanization Urban Mass Transportation Act-Private Partnership 1990s Global Warming CAAA 1990, ISTEA 1991, TEA21 1998 2000s Alternative Energy Sources Terrorism

Nagurney, Anna

374

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

.................................................................................................................................................70 Palouse

375

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

................................................................................................................ 64 Palouse Subbasin

376

Peer Review Plan Date: 11/28/2013  

E-Print Network [OSTI]

the Endangered Species Act in 1975. In 2007, the Yellowstone grizzly bear population was delisted but subsequent

Torgersen, Christian

377

Enterprise Assessments Targeted Review, Work Planning and Control at the  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember 2011DistrictLLC | Department ofEnhancedHanford Tank

378

Independent Oversight Review of DOE Headquarters Emergency Response Plans  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofThe fullTreatment andof EnergyEmergencyand

379

Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21, 2015 7:00AM to 10:30AM EDT| Department

380

Review of the Headquarters Facilities Emergency Response Plans  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReplyofRetiringIndependent Oversight and Performance

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Reviewing Measurement and Verification Plans for Federal ESPC Projects |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReplyofRetiringIndependent Oversight and

382

Safety Design Strategy Standard Review Plan (SRP) | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13 Page 1 of 1  470.4-7 |Safety

383

Project Execution Plan Review Module (RM) | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergy ProgressProject

384

Planning and Conducting Readiness Reviews - DOE Directives, Delegations,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006Photovoltaic Theory and ModelingPink SkiesEXTERNALa HomeSmalland

385

Peer Review Plan Date: 6/27/12  

E-Print Network [OSTI]

production of natural gas using hydraulic fracturing (fracking). This report, which will be published

Torgersen, Christian

386

National Mitigation Planning in Agriculture: Review and Guidelines | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithun JumpMuscoy,Jump9 CaseNatEl

387

National integrated mitigation planning in agriculture: A review paper |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithun JumpMuscoy,Jump9InformationCenter Jump

388

Code of Record Standard Review Plan (SRP) | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartment of4CenterPointChristinaClayCoal to Liquids »

389

Standard Review Plan - Code of Record | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverview * AnalyzerNano Olivines8forCode of

390

Standard Review Plan (SRP) Modules | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |RegulationRenewable EnergySouthwest4, 2010The Standard Contracts Team

391

Accelerator and electrodynamics capability review  

SciTech Connect (OSTI)

Los Alamos National Laboratory (LANL) uses capability reviews to assess the science, technology and engineering (STE) quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). Laboratory Management will use this report for STE assessment and planning. LANL has defined fifteen STE capabilities. Electrodynamics and Accelerators is one of the seven STE capabilities that LANL Management (Director, PADSTE, technical Associate Directors) has identified for review in Fiscal Year (FY) 2010. Accelerators and electrodynamics at LANL comprise a blend of large-scale facilities and innovative small-scale research with a growing focus on national security applications. This review is organized into five topical areas: (1) Free Electron Lasers; (2) Linear Accelerator Science and Technology; (3) Advanced Electromagnetics; (4) Next Generation Accelerator Concepts; and (5) National Security Accelerator Applications. The focus is on innovative technology with an emphasis on applications relevant to Laboratory mission. The role of Laboratory Directed Research and Development (LDRD) in support of accelerators/electrodynamics will be discussed. The review provides an opportunity for interaction with early career staff. Program sponsors and customers will provide their input on the value of the accelerator and electrodynamics capability to the Laboratory mission.

Jones, Kevin W [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

392

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect (OSTI)

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

393

Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years.

Greager, E.M.

1997-12-11T23:59:59.000Z

394

Facility effluent monitoring plan for the plutonium uranium extraction facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

Wiegand, D.L.

1994-09-01T23:59:59.000Z

395

Impacted material placement plans  

SciTech Connect (OSTI)

Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility.

Hickey, M.J.

1997-01-29T23:59:59.000Z

396

Introduction to Transportation Planning  

E-Print Network [OSTI]

Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 on a Saturday night, transportation is not an objective in and of itself, but a means to carry out the functions of daily living (i.e., it's a "derived good"). As a consequence, the transportation systems we build

Tipple, Brett

397

PENSION PLAN INFORMATION SESSION  

E-Print Network [OSTI]

%)* QPP (20%) Personal Savings RRSP, TFSA Company Pension Plan (49%)** Government Benefits Personal.lastname@mcgill.ca). If you forget your McGill Username or McGill Password, try logging into Minerva with your 9-digit McGill ID number and PIN. Once you have logged in successfully, go to the Personal Menu > Password for Mc

Kambhampati, Patanjali

398

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

399

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

400

PNNL Campus Master Plan  

SciTech Connect (OSTI)

The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

Mosey, Whitney LC

2012-09-07T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Multispecies Conservation Planning  

E-Print Network [OSTI]

CHAPTER 3 Multispecies Conservation Planning on U.S. Federal Lands Barry R. Noon, Kevin S. McKelvey, and Brett G. Dickson Numerous laws directly, or indirectly, mandate the conservation of all species that govern the use of these same lands that are in conflict with a goal of maximizing the conservation

402

Conservation Plan Issues  

E-Print Network [OSTI]

1 Northwest Power and Conservation Council Plan Issues: Regional Surplus Northwest Power and Conservation Council What is the Issue? · Some have expressed concern about the surplus that is included lean on the market and be fine ­ Calls into question the aggressive pursuit of conservation

403

Gonzales Comprehensive Plan  

E-Print Network [OSTI]

Programs (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails............242 Environment.....245 Future Environment..........283 Policy Table.........288 Appendix....292 Urban Design...

Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

2013-01-01T23:59:59.000Z

404

Aerocapacitor commercialization plan  

SciTech Connect (OSTI)

The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

NONE

1995-09-12T23:59:59.000Z

405

Student Health Benefit Plan  

E-Print Network [OSTI]

and programs tailored to the needs of students. The SHBP coordinates care with University Health Services (UHS), UMass Amherst's fully accredited health center. UHS provides comprehensive primary care, walk-in care2 2013-2014 Student Health Benefit Plan (SHBP) Designed for the Students of Policy Period: August 1

Massachusetts at Amherst, University of

406

Search Criteria Health Plan  

E-Print Network [OSTI]

Search Criteria Location: Distance: Health Plan: Provider Type: San Diego, CA 92103 Within 10 miles another provider, you are seeking care from that provider, not from Anthem Blue Cross. The provider benefit decisions only and are not the provision of medical care. Anthem Blue Cross is not responsible for

Gleeson, Joseph G.

407

Business Services Strategic Plan  

E-Print Network [OSTI]

Business Services Strategic Plan Updated September 2008 New Synergies: Launching Tomorrow's Leaders Discovery with Delivery Meeting Global Challenges Excellence in Business and Support Services #12;Introduction The mission of Business Services at Purdue University is to enable, serve, and support others

Holland, Jeffrey

408

COMMUNITY WILDFIRE PROTECTION PLANS  

E-Print Network [OSTI]

natural resource knowledge and technical expertise to the planning process, particularly in the areas of GIS and mapping, vegetation management, assessment of values and risks and funding strategies. WHAT of the community, priorities for fuel treatment may include critical watersheds, public water and power facilities

409

Environmental Education Strategic Plan  

SciTech Connect (OSTI)

This document is designed to guide the Environmental Education and Development Branch (EM-522) of the EM Office of Technology (OTD) Development, Technology Integration and Environmental Education Division (EM-52) in planning and executing its program through EM staff, Operations Offices, National Laboratories, contractors, and others.

none,

1991-12-01T23:59:59.000Z

410

Action Plan Materials Science  

E-Print Network [OSTI]

sense, including all strata) has available to it a wide range of con- venient products which improve, improving companies' pros- pects and generating wealth without harming the environment. And allAction Plan 2010-2013 Materials Science Area EXECUTIVE SUMMARY #12;N.B.: If you require any further

Fitze, Patrick

411

Planning support systems for spatial planning through social learning  

E-Print Network [OSTI]

This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

Goodspeed, Robert (Robert Charles)

2013-01-01T23:59:59.000Z

412

Chemical Hygiene Plan i January 2013 Chemical Hygiene Plan  

E-Print Network [OSTI]

Chemical Hygiene Plan i January 2013 Chemical Hygiene Plan (CHP) (Appendix C in Lab Safety Manual........................................................................................................................1-1 Chapter 2: Chemical Hazard Communication....................................................................................2-1 Chapter 3: Classes of Hazardous Chemicals

Nizkorodov, Sergey

413

Architecture & Urban Planning College of Architecture & Urban Planning  

E-Print Network [OSTI]

Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 300 projects for the remainder of the term. 560 Macroecon Envir Bus 3.00 ADVISORY, ENFORCED 74595 P RW REC 451

Shyy, Wei

414

Architecture & Urban Planning College of Architecture & Urban Planning  

E-Print Network [OSTI]

Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 690 Arc is reserved for Executive MBA students only, and meets from 7/19- 9/6. 637 Macroecon Envir Bus 1.50 ADVISORY

Shyy, Wei

415

Radiological Work Planning and Procedure  

SciTech Connect (OSTI)

Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD.

KURTZ, J.E.

2000-01-01T23:59:59.000Z

416

Retrospective modeling of the merit-order effect on wholesale electricity prices from distributed photovoltaic generation in the  

E-Print Network [OSTI]

Retrospective modeling of the merit-order effect on wholesale electricity prices from distributed, the depression in wholesale prices has significant value. c 5 GW of solar generation would have saved $1.8 billion in the market over two years. c The depression of wholesale prices offsets the cost of support

Sandiford, Mike

417

Fuel Fabrication Capability Research and Development Plan  

SciTech Connect (OSTI)

The purpose of this document is to provide a comprehensive review of the mission of the Fuel Fabrication Capability (FFC) within the Global Threat Reduction Initiative Convert Program, along with research and development (R&D) needs that have been identified as necessary to ensuring mission success. The design and fabrication of successful nuclear fuels must be closely linked endeavors. Therefore, the overriding motivation behind the FFC R&D program described in this plan is to foster closer integration between fuel design and fabrication to reduce programmatic risk. These motivating factors are all interrelated, and progress addressing one will aid understanding of the others. The FFC R&D needs fall into two principal categories, 1) baseline process optimization, to refine the existing fabrication technologies, and 2) manufacturing process alternatives, to evaluate new fabrication technologies that could provide improvements in quality, repeatability, material utilization, or cost. The FFC R&D Plan examines efforts currently under way in regard to coupon, foil, plate, and fuel element manufacturing, and provides recommendations for a number of R&D topics that are of high priority but not currently funded (i.e., knowledge gaps). The plan ties all FFC R&D efforts into a unified vision that supports the overall Convert Program schedule in general, and the fabrication schedule leading up to the MP-1 and FSP-1 irradiation experiments specifically. The fabrication technology decision gates and down-selection logic and schedules are tied to the schedule for fabricating the MP-1 fuel plates, which will provide the necessary data to make a final fuel fabrication process down-selection. Because of the short turnaround between MP-1 and the follow-on FSP-1 and MP-2 experiments, the suite of specimen types that will be available for MP-1 will be the same as those available for FSP-1 and MP-2. Therefore, the only opportunity to explore parameter space and alternative processing is between now and 2016 when the candidate processes are down-selected in preparation for the MP-1, FSP-1, and MP-2 plate manufacturing campaigns. A number of key risks identified by the FFC are discussed in this plan, with recommended mitigating actions for those activities within FFC, and identification of risks that are impacted by activities in other areas of the Convert Program. The R&D Plan does not include discussion of FFC initiatives related to production-scale manufacturing of fuel (e.g., establishment of the Pilot Line Production Facility), rather, the goal of this plan is to document the R&D activities needed ultimately to enable high-quality and cost-effective production of the fuel by the commercial fuel fabricator. The intent is for this R&D Plan to be a living document that will be reviewed and updated on a regular basis (e.g., annually) to ensure that FFC R&D activities remain properly aligned to the needs of the Convert Program. This version of the R&D Plan represents the first annual review and revision.

Senor, David J.; Burkes, Douglas

2014-04-17T23:59:59.000Z

418

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

419

Massachusetts Ocean Management Plan (Massachusetts)  

Broader source: Energy.gov [DOE]

The Massachusetts Ocean Act of 2008 required the states Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

420

Climate Action Plan (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate change and the problems it poses. The Plan...

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Accessibility-based transit planning  

E-Print Network [OSTI]

A method for evaluating transit planning proposals using accessibility metrics is advanced in this research. A transit-accessibility model is developed intended for use by in-house transit agency planning staff as a ...

Busby, Jeffrey R

2004-01-01T23:59:59.000Z

422

Agricultural Sciences Strategic Plan 20082013  

E-Print Network [OSTI]

Actions 15 Facilities and Land--Progress and Further Planning 24 FiveYear Recycling Plan and Program.This daring concept has led to a nationwide system of colleges and universities that create new knowledge

Kaye, Jason P.

423

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

424

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and

CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

2009-09-15T23:59:59.000Z

425

RIVER PROTECTION PROJECT SYSTEM PLAN  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of

CERTA PJ

2008-07-10T23:59:59.000Z

426

NANA Strategic Energy Plan & Energy Options Analysis  

SciTech Connect (OSTI)

NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authoritys state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine. Biomass Feasibility analysis in the upper Kobuk; Run of the river hydroelectric development for the Upper Kobuk; Solar photovoltaic (PV) power demonstration projects for Noatak, Ambler, Selawik, Kiana, and Noorvik; Heat Recovery for several communities; In September 2008, the NRC team participated at the Alaska Rural Energy Conference in Girdwood, Alaska In November 2008, the NRC team gave a presentation on the NANA regional energy plans at a DOE Tribal Energy Program conference in Denver, Colorado. In January 2009, the final SEP report was submitted to NRC.

Jay Hermanson; Brian Yanity

2008-12-31T23:59:59.000Z

427

Best Management Practice #1: Water Management Planning  

Broader source: Energy.gov [DOE]

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

428

Space Conditioning Standing Technical Committee Strategic Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan This strategic plan document outlines the gaps, barriers, and opportunities identified by...

429

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

430

NERSC Strategic Plan Is Now Online  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. More NERSC...

431

NATIONAL PLAN TO ACHIEVE MARITIME DOMAIN AWARENESS  

E-Print Network [OSTI]

infrastructure following attack or similar disruption. · Maritime Transportation System Security Plan responds regarding the maritime domain. · Maritime Commerce Security Plan establishes a comprehensive plan to secure

Acton, Scott

432

Strategic Energy Planning | Department of Energy  

Office of Environmental Management (EM)

Resources Energy Resource Library Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy...

433

Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan  

SciTech Connect (OSTI)

The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: {center_dot}as a tool and process for achieving more sustainable and strategic planning; {center_dot}to determine the level of integration of SEA within the planning system; and, {center_dot}its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

Che Xiuzhen, E-mail: chexiuzhen@sohu.com [Shenzhen Academy of Environmental Science, Shenzhen, Guangdong (China); English, Alex [Centre for Strategic Economic Studies, Victoria University (Australia); Lu Jia [Shenzhen Urban Planning and Research Center, Shenzhen, Guangdong (China); Chen, Yongqin David [Department of Geography and Resource Management, Chinese University of Hong Kong, Hong Kong (Hong Kong); Centre of Strategic Environmental Assessment for China, Chinese University of Hong Kong, Hong Kong (Hong Kong)

2011-11-15T23:59:59.000Z

434

2030 Transportation and Mobility Plan  

E-Print Network [OSTI]

sections are as follows: 1. Introduction 2. Bi-State MPO Area Description 3. Planning Horizon Description and Data Projections 4. Long Range Plan Presentation 5. Plan Implementation and Monitoring Procedures 6. Bi-State MPO 2030 Transportation..., improved access at the Leigh Avenue/I-540 interchange, and the deployment of appropriate Intelligent Transportation Systems (ITS) projects. The Airport Master Plan Update has estimated a total airport improvement cost of $ 74,170,000 over a Three (3...

Bi-State Metropolitan Planning Organization

2006-08-11T23:59:59.000Z

435

Climate Action Plan (Manitoba, Canada)  

Broader source: Energy.gov [DOE]

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

436

Energy Management and Conservation Plan  

E-Print Network [OSTI]

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

437

Planning and Search Exam format  

E-Print Network [OSTI]

is the frame problem. Revision 5 #12;Exam topics: planning Classical planning. How the problem definitionPlanning and Search Revision Revision 1 #12;Outline Exam format Exam topics How to revise Revision 2 #12;Exam format 4 questions out of 6 same format as 2010-2011 and 2011-2012 exams (on G52PAS

Alechina, Natasha

438

Clean Energy Business Plan Competition  

ScienceCinema (OSTI)

Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

2013-05-29T23:59:59.000Z

439

BUSINESS PLAN SCHOLARSHIP COMPETITION ANNOUNCEMENT  

E-Print Network [OSTI]

BUSINESS PLAN SCHOLARSHIP COMPETITION ANNOUNCEMENT Established in late 2001, My Sister's House Sister's House is offering a business plan competition to local college and graduate students to identify. The business plan which should be conducted under the approval of a business or business related professor

California at Davis, University of

440

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

442

CIPS Validation Data Plan  

SciTech Connect (OSTI)

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

Nam Dinh

2012-03-01T23:59:59.000Z

443

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network [OSTI]

, efficient and cost effective manner; Maximize the capital dollars available to UCSB from all sources with other campuses for scarce resources.); Optimize the use of capital dollars; Establish a clear; whose total cost is over $400,000. #12;B. 5-YEAR STATE-FUNDED MAJOR CAPITAL IMPROVEMENT PROGRAM

California at Santa Barbara, University of

444

Business plan proposal  

E-Print Network [OSTI]

about you and your business. The following guideline has been provided to ensure that important points are included in the executive summary. Your business may believe that other information may be pertinent to the completion of the agribusiness plan..., partnership, corporation), if it is a merchandising, processing, or service related business. Is it a new business? an expansion? or a relocation? If it is a relocation, where are you currently located? Trace the history of your business: when was it formed...

Kucera, Carolyn

1991-01-01T23:59:59.000Z

445

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... when a motor fails and must either be replaced or repaired. This is represented visually in Figure 1. When purchasing a motor for a new application, time is usually available to consider various options. However, once a motor has failed...

Elliott, R. N.

446

Lubbock Metropolitan Transportation Plan  

E-Print Network [OSTI]

for Users (SAFETEA-LU) and its predecessors, the Transportation Equity Act for the 21st Century (TEA-21) and the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991, specified the transportation systems on which certain federal funds can... in Chapter 5 ? Streets and Highways; Chapter 6 ? Public Transportation; Chapter 7 ? Bicycle and Pedestrian Plan; Chapter 8 ? Lubbock International Airport and Chapter 9 ? Railroads and Trucking. Federally funded transit projects were developed...

Lubbock Metropolitan Planning Organization

2007-09-18T23:59:59.000Z

447

Pretreatment Technology Plan  

SciTech Connect (OSTI)

This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

1993-03-01T23:59:59.000Z

448

ARM - Lesson Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC : XDCResearch Related Information CollaborationsOrganizationLaboratoryPlans

449

Health impact assessment in planning: Development of the design for health HIA tools  

SciTech Connect (OSTI)

How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

Forsyth, Ann, E-mail: forsyth@cornell.ed [Cornell University, 106 West Sibley Hall, Ithaca, NY 14853 (United States); Slotterback, Carissa Schively, E-mail: cschively@umn.ed [Humphrey Institute of Public Affairs, University of Minnesota, 130 HHH Center, 301 19th Ave. S., Minneapolis, MN 55455 (United States); Krizek, Kevin J., E-mail: krizek@colorado.ed [Active Communities/Transportation (ACT) Research Group, University of Colorado, 1250 14th St. Denver, CO 80202 (United States)

2010-01-15T23:59:59.000Z

450

Project Management Plan  

SciTech Connect (OSTI)

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

451

TRUPACT-1 implementation plan  

SciTech Connect (OSTI)

TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

1985-09-01T23:59:59.000Z

452

Mobile systems capability plan  

SciTech Connect (OSTI)

This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

NONE

1996-09-01T23:59:59.000Z

453

WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

2003-09-01T23:59:59.000Z

454

FY 1994 Annual Work Plan  

SciTech Connect (OSTI)

In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

Not Available

1993-09-30T23:59:59.000Z

455

NIF Title III engineering plan  

SciTech Connect (OSTI)

The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

Deis, G

1998-06-01T23:59:59.000Z

456

Project Management Plan Solution Stabilization  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

SATO, P.K.

1999-08-31T23:59:59.000Z

457

Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-08-01T23:59:59.000Z

458

Wildland Fire Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

Green,T.

2009-10-23T23:59:59.000Z

459

RELIABILITY PLANNING IN DISTRIBUTED ELECTRIC ENERGY SYSTEMS  

E-Print Network [OSTI]

RESILIENCE; OR RELIABILITY SENSITIVITy .. RiskReliability Planning: Preliminary Definitions.Dioision, Ext. 6782 Reliability Planning in Distributed

Kahn, E.

2011-01-01T23:59:59.000Z

460

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not have detrimental effects on the environment. This EMP is to be reviewed annually and updated every three years unless otherwise requested by the DOE or contractor.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-02-19T23:59:59.000Z

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Plan B 2.0: Rescuing a Planet Under Stress and a Civilization in Trouble1 Gaylord Nelson Retrospective Lecture Series  

E-Print Network [OSTI]

. And with each wind farm, rooftop solar panel, paper recycling facility, bicycle path, and reforestation program, the new economy will be powered by abundant sources of renewable energy: wind, solar, geothermal

Sheridan, Jennifer

462

Potential Dosimetric Benefits of Four-Dimensional Radiation Treatment Planning  

SciTech Connect (OSTI)

Purpose: To determine the extent of dosimetric differences between conventional three-dimensional (3D) dose calculations and four-dimensional (4D) dose calculations based on deformation of organ models. Methods and Materials: Four-dimensional dose calculations were retrospectively performed on computed tomography data sets for 15 patients with Stage III non-small-cell lung cancer, using a model-based deformable registration algorithm on a research version of a commercial radiation treatment planning system. Target volume coverage and doses to critical structures calculated using the 4D methodology were compared with those calculated using conventional 3D methodology. Results: For 11 of 15 patients, clinical target volume coverage was comparable in the 3D and 4D calculations, whereas for 7 of 15 patients, planning target volume coverage was comparable. For the other patients, the 4D calculation indicated a difference in target volume dose sufficiently great to warrant replanning. No correlations could be established between differences in 3D and 4D calculations and gross tumor volume size or extent of motion. Negligible differences were observed between 3D and 4D dose-volume relationships for normal anatomic structures. Conclusions: Use of 4D dose calculations, when possible, helps ensure that target volumes will not be underirradiated when respiratory motion may affect the dose distribution.

Starkschall, George [Department of Radiation Physics, University of Texas M. D. Anderson Cancer Center, Houston, TX (United States)], E-mail: gstarksc@mdanderson.org; Britton, Keith [Department of Radiation Physics, University of Texas M. D. Anderson Cancer Center, Houston, TX (United States); Department of Radiation Oncology, University of Texas M. D. Anderson Cancer Center, Houston, TX (United States); McAleer, Mary F.; Jeter, Melenda D. [Department of Radiation Oncology, University of Texas M. D. Anderson Cancer Center, Houston, TX (United States); Kaus, Michael R.; Bzdusek, Karl [Philips Radiation Oncology Systems, Fitchburg, WI (United States); Mohan, Radhe [Department of Radiation Physics, University of Texas M. D. Anderson Cancer Center, Houston, TX (United States); Cox, James D. [Department of Radiation Oncology, University of Texas M. D. Anderson Cancer Center, Houston, TX (United States)

2009-04-01T23:59:59.000Z

463

Readiness Review Training - Development of Criteria And Review...  

Office of Environmental Management (EM)

Development of Criteria And Review Approach Documents Readiness Review Training - Development of Criteria And Review Approach Documents November 8-9, 2010 Readiness Review Training...

464

2014 Annual Merit Review Results Report - Merit Review Attendees...  

Energy Savers [EERE]

Merit Review Attendees 2014 Annual Merit Review Results Report - Merit Review Attendees Merit review of DOE Vehicle Technologies research activities 2014amr13.pdf More Documents...

465

TransBorder 2035 Metropolitan Transportation Plan  

E-Print Network [OSTI]

i TransBorder 2035 Metropolitan Transportation Plan November 16, 2007 El Paso Metropolitan Planning Organization www.elpasompo.org ii TransBorder 2035 Metropolitan Transportation Plan November 16, 2007... El Paso Metropolitan Planning Organization www.elpasompo.org iii TransBorder 2035 Metropolitan Transportation Plan November 16, 2007 El Paso Metropolitan Planning Organization www.elpasompo.org iv Trans...

El Paso Metropolitan Planning Organization

2007-11-16T23:59:59.000Z

466

Environmental Management System Plan  

SciTech Connect (OSTI)

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

467

ESnet Program Plan 1994  

SciTech Connect (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

468

A planning and delivery study of a rotational IMRT technique with burst delivery  

SciTech Connect (OSTI)

Purpose: A novel rotational IMRT (rIMRT) technique using burst delivery (continuous gantry rotation with beam off during MLC repositioning) is investigated. The authors evaluate the plan quality and delivery efficiency and accuracy of this dynamic technique with a conventional flat 6 MV photon beam. Methods: Burst-delivery rIMRT was implemented in a planning system and delivered with a 160-MLC linac. Ten rIMRT plans were generated for five anonymized patient cases encompassing head and neck, brain, prostate, and prone breast. All plans were analyzed retrospectively and not used for treatment. Among the varied plan parameters were the number of optimization points, number of arcs, gantry speed, and gantry angle range (alpha) over which the beam is turned on at each optimization point. Combined rotational/step-and-shoot rIMRT plans were also created by superimposing multiple-segment static fields at several optimization points. The rIMRT trial plans were compared with each other and with plans generated using helical tomotherapy and VMAT. Burst-mode rotational IMRT plans were delivered and verified using a diode array, ionization chambers, thermoluminescent dosimeters, and film. Results: Burst-mode rIMRT can achieve plan quality comparable to helical tomotherapy, while the former may lead to slightly better OAR sparing for certain cases and the latter generally achieves slightly lower hot spots. Few instances were found in which increasing the number of optimization points above 36, or superimposing step-and-shoot IMRT segments, led to statistically significant improvements in OAR sparing. Using an additional rIMRT partial arc yielded substantial OAR dose improvements for the brain case. Measured doses from the rIMRT plan delivery were within 4% of the plan calculation in low dose gradient regions. Delivery time range was 228-375 s for single-arc rIMRT 200-cGy prescription with a 300 MU/min dose rate, comparable to tomotherapy and VMAT. Conclusions: Rotational IMRT with burst delivery, whether combined with static fields or not, yields clinically acceptable and deliverable treatment plans.

Kainz, Kristofer; Chen, Guang-Pei; Chang, Yu-Wen; Prah, Douglas; Sharon Qi, X.; Shukla, Himanshu P.; Stahl, Johannes; Allen Li, X. [Department of Radiation Oncology, Medical College of Wisconsin, Milwaukee, Wisconsin 53226 (United States); Department of Radiation Oncology, University of Colorado Denver, Aurora, Colorado 80045 (United States); Siemens Oncology Care Systems, Concord, California 94520 (United States); Department of Radiation Oncology, Medical College of Wisconsin, Milwaukee, Wisconsin 53226 (United States)

2011-09-15T23:59:59.000Z

469

PETC Review  

SciTech Connect (OSTI)

This issue of the PETC Review is devoted to explaining how the private sector can do business with DOE-and with PETC in particular-and how DOE works with academia, industry, and state and local groups to accomplish objectives of mutual interest. Over the past several years, the notion of cost-sharing'' has been receiving increased attention. Indeed, cost-shared RD D is becoming the norm, not only within DOE but also among other government agencies, including the Department of Defense. It may surprise some of our readership to learn that RD D cost-sharing is not a new government policy. In fact, it has been part of the DOE Acquisition Regulations from their inception in 1977. In lay terms, cost participation, a general kind of cost-sharing, is required for RD D efforts in which the non-Federal participant's goal is commercialization or in situations for which it is reasonable to expect that economic benefits will accrue to the participant as a result of the work. The policy is quite flexible and states that the degree of non-DOEcost participation depends on a number of factors, including the nature of the work performed and the extent of the project risk. As competition for RD D funds increases, it is to be expected that cost-sharing requirements for development, and even for basic research, will increase. Nevertheless, we think that Federal support of RD D will continue to be necessary to maintain this country's leadership in science, technology, industry, and living standards.

Santore, R.R.; Blaustein, B.D.; Friedman, S.; Reiss, J.; Brown, J.; Price, M.M. (eds.)

1993-01-01T23:59:59.000Z

470

Guidance for Planning Exercises  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel Cell VehicleEnergyGreensburgUMTRCA Title I and TitleandPlanning,

471

Planning, Budget, and Analysis  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSalesOE0000652GrowE-mail onThe2 DOE11.4 Planning and

472

Plans, Updates, Regulatory Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006Photovoltaic Theory and ModelingPinkand Results Plans, Community,

473

ESnet Planning, Status,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct:DirectivesSAND2015-21271MostMirror ServersESnet Planning,

474

Strategic Plan: 2014 - 2018  

Gasoline and Diesel Fuel Update (EIA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines About U.S. NaturalA. Michael Schaal Director, Oil and10:InformationSteamStrategic Plan:

475

Decommissioning Plan RM  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE Zero EnergyData Center Optimization Plan3Energy 4, 2007:

476

Facility effluent monitoring plan for 242-A evaporator facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

Crummel, G.M.; Gustavson, R.D.

1995-02-01T23:59:59.000Z

477

Facility effluent monitoring plan for the 222-S Laboratory  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable Federal, State, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

Nickels, J.M.; Warwick, G.J.

1992-11-01T23:59:59.000Z

478

Fisheries Utilization Research-50 Years in Retrospect, Part II: The Enduring Research Themes  

E-Print Network [OSTI]

-produced fish. Finally, the fishery products used in pet foods are important as they relate to the health of millions of pets. In past years, I reviewed many reports of the fisheries chemists of the 1930's and 1940's not be said of botulism and several other unpleasant diseases related to fishery consumption

479

Book Review Review of German, Lin, Parson  

E-Print Network [OSTI]

of magmatic, tec- tonic, and hydrothermal processes. These are more than review papers, althoughBook Review Review of German, Lin, Parson (eds), `Mid-Ocean Ridges: Hydrothermal Interactions of Hydrothermal Cir- culation.' AGU Geophysical Mono- graph 148 is a series of papers prepared for and inspired

Fisher, Andrew

480

Functional Area Criteria & Review Approach Documents  

Broader source: Energy.gov [DOE]

CRADS provided on this page are provided as examples of functional area Objectives and Criteria used to evaluate how requirements are meet. They are only examples and should not be utilized as is. In accordance with DOE Standard 3006-2010, CRADs should be developed by team members to reflect the specifics of the proposed review (i.e., breadth and depth) as defined in the approved Plan of Action.

Note: This page contains sample records for the topic "retrospective review plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

MHD Technology Transfer, Integration and Review Committee  

SciTech Connect (OSTI)

This fifth semi-annual status report of the MHD Technology Transfer, Integration, and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1990 through September 1990. It includes summaries and minutes of committee meetings, progress summaries of ongoing Proof-of-Concept (POC) contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months.

Not Available

1992-01-01T23:59:59.000Z

482

Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.  

SciTech Connect (OSTI)

In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

1993-03-10T23:59:59.000Z

483

Review: Hijacking Sustainability  

E-Print Network [OSTI]

addressing the attack on sustainability, Sharon Beders 2002Review: Hijacking Sustainability By Adrian Parr Reviewed byParr, Adrian. Hijacking Sustainability. Cambridge, MA: MIT

Antonelli, Monika

2010-01-01T23:59:59.000Z

484

Waste classification sampling plan  

SciTech Connect (OSTI)

The purpose of this sampling is to explain the method used to collect and analyze data necessary to verify and/or determine the radionuclide content of the B-Cell decontamination and decommissioning waste stream so that the correct waste classification for the waste stream can be made, and to collect samples for studies of decontamination methods that could be used to remove fixed contamination present on the waste. The scope of this plan is to establish the technical basis for collecting samples and compiling quantitative data on the radioactive constituents present in waste generated during deactivation activities in B-Cell. Sampling and radioisotopic analysis will be performed on the fixed layers of contamination present on structural material and internal surfaces of process piping and tanks. In addition, dose rate measurements on existing waste material will be performed to determine the fraction of dose rate attributable to both removable and fixed contamination. Samples will also be collected to support studies of decontamination methods that are effective in removing the fixed contamination present on the waste. Sampling performed under this plan will meet criteria established in BNF-2596, Data Quality Objectives for the B-Cell Waste Stream Classification Sampling, J. M. Barnett, May 1998.

Landsman, S.D.

1998-05-27T23:59:59.000Z

485

Certified Professional in Supply Management (CPSM) Review Series: Exam 2: Effective Supply Management Performance  

E-Print Network [OSTI]

Materials and Inventory Management Organization/Department Assessment Planning Product and ServiceCertified Professional in Supply Management (CPSM) Review Series: Exam 2: Effective Supply Management Performance Dates: October 28, 2011 Location: Rutgers University Livingston Campus, Tillett Hall

486

Conduct of operations implementation plan  

SciTech Connect (OSTI)

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

487

Electric utility system master plan  

SciTech Connect (OSTI)

This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

Erickson, O.M.

1992-10-01T23:59:59.000Z

488

Facility effluent monitoring plan for the tank farms facilities  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

Bachand, D.D.; Crummel, G.M.

1995-05-01T23:59:59.000Z

489

Geothermal power development in Hawaii. Volume I. Review and analysis  

SciTech Connect (OSTI)

The history of geothermal exploration in Hawaii is reviewed briefly. The nature and occurrences of geothermal resources are presented island by island. An overview of geothermal markets is presented. Other topies covered are: potential markets of the identified geothermal areas, well drilling technology, hydrothermal fluid transport, overland and submarine electrical transmission, community aspects of geothermal development, legal and policy issues associated with mineral and land ownership, logistics and infrastructure, legislation and permitting, land use controls, Regulation 8, Public Utilities Commission, political climate and environment, state plans, county plans, geothermal development risks, and business planning guidelines.

Not Available

1982-06-01T23:59:59.000Z

490

Ocean Studies Board annual report 1989 and future plans  

SciTech Connect (OSTI)

The major activities of the Ocean Studies Board of the National Research Council for 1989 are reviewed. The following are discussed: the Navy Panel, the CO2 Panel, the Committee on the Ocean`s Role in Global Change, the Committee on the Coastal Ocean, the Workshop on Issues of U.S. Marine Fisheries, and the Continental Margins Workshop Committee. Future plans are covered.

Not Available

1990-12-31T23:59:59.000Z

491

Chemical Hygiene and Safety Plan  

E-Print Network [OSTI]

Preventive Maintenance .and Safet_l Plan 6. Preventive Maintenance Hazard ControlE-12, E-13, D-3 preventive maintenance, B-7, F-16 to F-18,

Ricks Editor, R.

2009-01-01T23:59:59.000Z

492

Community Energy Strategic Planning Resources  

Broader source: Energy.gov [DOE]

Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

493

Health & Safety Plan Last Updated  

E-Print Network [OSTI]

Health & Safety Plan Last Updated March 2008 1 #12;A. SCOPE AND RESPONSIBILITY....................................................................................................................................... 3 2. Safety and Health Policy...................................................................................................................... 3 4. Safety Coordinator

Anderson, Richard

494

Conversion Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

document the conversion plan that clearly defines the system or project's conversion procedures; outlines the installation of new and converted filesdatabases; coordinates the...

495

Hanford 200 Areas Development Plan  

SciTech Connect (OSTI)

The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

Rinne, C.A.; Daly, K.S.

1993-08-01T23:59:59.000Z

496

Groundwater Protection Plan (West Virginia)  

Broader source: Energy.gov [DOE]

Groundwater Protection Plans (GPPs) are required for all facilities having the potential to impact groundwater. They are preventive maintenance documents that cover all processes and materials at...

497

Emergency Readiness Assurance Plans (ERAPs)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

1997-08-21T23:59:59.000Z

498

Planning Water Use in California  

E-Print Network [OSTI]

the University of Maryland Water Policy Collaborative, 2006.FURTH ER READ ING California Department of Water Resources.California Water Plan Update 2005: A Framework for Action.

Eisenstein, William; Kondolf, G. Mathias

2008-01-01T23:59:59.000Z

499

National Grid Energy Efficiency Plans  

Broader source: Energy.gov [DOE]

Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

500

An information modeling framework for process planning  

E-Print Network [OSTI]

69 69 CHAPTER Page F G H Structure of Infons . The Model G. l. Process Plan G. 2. Process Plan Set G. 3. Process Plan Activity G. 4. Recursive Nature G. 5. Process Plan Set Element G. 6. Serial Process Plan Set . G. 7. Parallel Process... Knowle D. Implications of Dimensions and Tolerances E. Set-Up Planning F. Tool Path Planning G. Activity Parameter Specification 3. Observations of Situation Theoretic Modelling 4. Interaction Between Models A. Interaction in Terms of Databases B...

Atreya, Dinesh S.

1993-01-01T23:59:59.000Z