  1. Transuranic (TRU) Waste Phase I Retrieval Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    1999-08-27

    Phase I retrieval of post-1970 TRU wastes from burial ground 218-W-4C can be done in a safe, efficient, and cost-effective manner. Initiating TRU retrieval by retrieving uncovered drums from Trenches 1, 20, and 29, will allow retrieval to begin under the current SWBG safety authorization basis. The retrieval of buried drums from Trenches 1, 4, 20, and 29, which will require excavation, will commence once the uncovered drum are retrieved. This phased approach allows safety analysis for drum venting and drum module excavation to be completed and approved before the excavation proceeds. In addition, the lessons learned and the operational experience gained from the retrieval of uncovered drums can be applied to the more complicated retrieval of the buried drums. Precedents that have been set at SRS and LANL to perform retrieval without a trench cover, in the open air, should be followed. Open-air retrieval will result in significant cost savings over the original plans for Phase I retrieval (Project W-113). Based on LANL and SRS experience, open-air retrieval will have no adverse impacts to the environment or to the health and safety of workers or the public. Assaying the waste in the SWBG using a mobile assay system, will result in additional cost savings. It is expected that up to 50% of the suspect-TRU wastes will assay as LLW, allowing those waste to remain disposed of in the SWBG. Further processing, with its associated costs, will only occur to the portion of the waste that is verified to be TRU. Retrieval should be done, to the extent possible, under the current SWBG safety authorization basis as a normal part of SWBG operations. The use of existing personnel and existing procedures should be optimized. By working retrieval campaigns, typically during the slow months, it is easier to coordinate the availability of necessary operations personnel, and it is easier to coordinate the availability of a mobile assay vendor.

  2. Transuranic (TRU) Waste Phase I Retrieval Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-09-28

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval scenario similar to those used for TRU drum retrieval at LANL and SRS. Phase I retrieval consists of the activities associated with the assessment of approximately 10,000 55-gallon drums of suspect TRU-waste in burial ground 218-W-4C and the retrieval of those drums verified to contain TRU waste. Four of the trenches in 218-W-4C (Trenches 1, 4, 20, and 29) are prime candidates for Phase I retrieval because they contain large numbers of suspect TRU drums, stacked from 2 to 5 drums high, on an asphalt pad. In fact, three of the trenches (Trenches 1 , 20, and 29) contain waste that has not been covered with soil, and about 1500 drums can be retrieved without excavation. The other three trenches in 218-W-4C (Trenches 7, 19, and 24) are not candidates for Phase I retrieval because they contain significant numbers of boxes. Drums will be retrieved from the four candidate trenches, checked for structural integrity, overpacked, if necessary, and assayed at the burial

  3. Single Shell Tank (SST) Retrieval Project Plan for Tank 241-C-104 Retrieval

    SciTech Connect (OSTI)

    DEFIGH PRICE, C.

    2000-09-20

    In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System'' will provide systems for retrieval and transfer of radioactive waste from tank 241-C-104 (C-104) to the DST staging tank 241-AY-101 (AY-101). At the conclusion of Project W-523, a retrieval system will have been designed and tested to meet the requirements for Acceptance of Beneficial Use and been turned over to operations. Completion of construction and operations of the C-104 retrieval system will meet the recently proposed near-term Tri-Party Agreement milestone, M-45-03F (Proposed Tri-Party Agreement change request M-45-00-01A, August, 30 2000) for demonstrating limits of retrieval technologies on sludge and hard heels in SSTs, reduce near-term storage risks associated with aging SSTs, and provide feed for the tank waste treatment plant. This Project Plan documents the methodology for managing Project W-523; formalizes responsibilities; identifies key interfaces required to complete the retrieval action; establishes the technical, cost, and schedule baselines; and identifies project organizational requirements pertaining to the engineering process such as environmental, safety, quality assurance, change control, design verification, testing, and operational turnover.

  4. Tank waste remediation system tank waste retrieval risk management plan

    SciTech Connect (OSTI)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  5. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    SciTech Connect (OSTI)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D; Falter, Diedre D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. This review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.

  6. OSTI highlights "AEC Information Retrieval Experiment" | OSTI...

    Office of Scientific and Technical Information (OSTI)

    OSTI has featured the AEC experiment at its DOE R&D Accomplishments Web site. DOE R&D Accomplishments is a central forum for information about the outcomes of past DOE R&D that ...

  7. Tank waste remediation system retrieval and disposal mission waste feed delivery plan

    SciTech Connect (OSTI)

    Potter, R.D.

    1998-01-08

    This document is a plan presenting the objectives, organization, and management and technical approaches for the Waste Feed Delivery (WFD) Program. This WFD Plan focuses on the Tank Waste Remediation System (TWRS) Project`s Waste Retrieval and Disposal Mission.

  8. Hanford contact-handled transuranic drum retrieval project planning document

    SciTech Connect (OSTI)

    DEMITER, J.A.

    1998-11-17

    The Hanford Site is one of several US Department of Energy (DOE) sites throughout the US that has generated and stored transuranic (TRU) wastes. The wastes were primarily placed in 55-gallon drums, stacked in trenches, and covered with soil. In 1970, the Nuclear Regulatory Commission ordered that TRU wastes be segregated from other radioactive wastes and placed in retrievable storage until such time that the waste could be sent to a geologic repository and permanently disposed. Retrievable storage also defined container storage life by specifying that a container must be retrievable as a contamination-free container for 20 years. Hanford stored approximately 37,400 TRU containers in 20-year retrievable storage from 1970 to 1988. The Hanford TRU wastes placed in 20-year retrievable storage are considered disposed under existing Resource Conservation and Recovery Act (RCRA) regulations since they were placed in storage prior to September 1988. The majority of containers were 55-gallon drums, but 20-year retrievable storage includes several TRU wastes covered with soil in different storage methods.

  9. Tank 241-C-106 waste retrieval sluicing system process control plan

    SciTech Connect (OSTI)

    Carothers, K.G.

    1998-07-25

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity.

  10. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect (OSTI)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  11. Tank Waste Remediation System (TWRS) Retrieval Authorization Basis Amendment Task Plan

    SciTech Connect (OSTI)

    HARRIS, J.P.

    1999-08-31

    This task plan is a documented agreement between Nuclear Safety and Licensing and Retrieval Engineering. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Delivery Program, Project W-211, Project W-521, and Project W-522.

  12. Tank Waste Remediation System (TWRS) Retrieval Authorization Basis Amendment Task Plan

    SciTech Connect (OSTI)

    HARRIS, J.P.

    2000-03-27

    This task plan is a documented agreement between Nuclear Safety and Licensing and Retrieval Engineering. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Delivery Program, Project W-211, Project W-521, and Project W-522.

  13. Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary

    SciTech Connect (OSTI)

    1987-03-01

    This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

  14. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-04-19

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.

  15. Safety plan for the cooperative telerobotic retrieval system equipment development area

    SciTech Connect (OSTI)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  16. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    SciTech Connect (OSTI)

    BUSSELL, J.H.

    1999-08-02

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K compliance for Project W-151, Tank 101-AZ Waste Retrieval System. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. Two mixer pumps and instrumentation have been or are planned to be installed in waste tank 101-AZ to demonstrate solids mobilization. The information and experience gained during this process test will provide data for comparison with sludge mobilization prediction models and provide indication of the effects of mixer pump operation on an Aging Waste Facility tank. A limited description of system dates, functions, interfaces, potential Y2K problems, and date resolutions is presented. The project is presently on hold, and definitive design and procurement have been completed. This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  17. TWRS retrieval and storage mission, immobilized low-activity waste disposal plan

    SciTech Connect (OSTI)

    Shade, J.W.

    1998-01-07

    The TWRS mission is to store, treat, and immobilize highly radioactive Hanford waste (current and future tank waste and the encapsulated cesium and strontium) in a safe, environmentally sound, and cost-effective manner (TWRS JMN Justification for mission need). The mission includes retrieval, pretreatment, immobilization, interim storage and disposal, and tank closure. As part of this mission, DOE has established the TWRS Office to manage all Hanford Site tank waste activities. The TWRS program has identified the need to store, treat, immobilize, and dispose of the highly radioactive Hanford Site tank waste and encapsulated cesium and strontium materials in an environmentally sound, safe, and cost-effective manner. To support environmental remediation and restoration at the Hanford Site a two-phase approach to using private contractors to treat and immobilize the low-activity and high-level waste currently stored in underground tanks is planned. The request for proposals (RFP) for the first phase of waste treatment and immobilization was issued in February 1996 (Wagoner 1996) and initial contracts for two private contractor teams led by British Nuclear Fuels Ltd. and Lockheed-Martin Advanced Environmental Services were signed in September 1996. Phase 1 is a proof-of-concept and commercial demonstration effort to demonstrate the technical and business feasibility of using private facilities to treat Hanford Site waste, maintain radiological, nuclear, process, and occupational safety; and maintain environmental protection and compliance while reducing lifecycle costs and waste treatment times. Phase 1 production of ILAW is planned to begin in June 2002 and could treat up to about 13 percent of the waste. Phase 1 production is expected to be completed in 2007 for minimum order quantities or 2011 for maximum order quantities. Phase 2 is a full-scale production effort that will begin after Phase 1 and treat and immobilize most of the waste. Phase 2 production is

  18. ARM West Antarctic Radiation Experiment (AWARE) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 ARM West Antarctic Radiation Experiment (AWARE) Science Plan D Lubin J Verlinde DH ... DOESC-ARM-15-040 ARM West Antarctic Radiation Experiment (AWARE) Science Plan D Lubin J ...

  19. Experiment Science Plan D Turner D Parsons B Geerts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plains Elevated Convection at Night (PECAN) Experiment Science Plan D Turner D Parsons B ... DOESC-ARM-14-035 Plains Elevated Convection at Night (PECAN) Experiment Science Plan ...

  20. TWRS retrieval and disposal mission, immobilized high-level waste storage plan

    SciTech Connect (OSTI)

    Calmus, R.B.

    1998-01-07

    This project plan has a two fold purpose. First, it provides a plan specific to the Hanford Tank Waste Remediation System (TWRS) Immobilized High-Level Waste (EMW) Storage Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestone M-90-01 (Ecology et al. 1996) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan. Second, it provides an upper tier document that can be used as the basis for future subproject line item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 (DOE 1992a) and 430.1 (DOE 1995)). The format and content of this project plan are designed to accommodate the plan`s dual purpose. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.

  1. TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan

    SciTech Connect (OSTI)

    BURBANK, D.A.

    1999-09-01

    This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as the basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.

  2. Planning for an integrated research experiment

    SciTech Connect (OSTI)

    Barnard, J.J.; Ahle, L.E.; Bangerter, R.O.; Bieniosek, F.M.; Celata, C.M.; Faltens, A.; Friedman, A.; Grote, D.P.; Haber, I.; Henestroza, E.; Kishek, R.A.; de Hoon, M.J.L.; Karpenko, V.P.; Kirhek, R.A.; Kwan, J.W.; Lee, E.P.; Logan, B.G.; Lund, S.M.; Meier, W.R.; Molvik, A.W.; Sangster, T.C.; Seidl, P.A.; Sharp, W.M.

    2001-03-25

    We describe the goals and research program leading to the Heavy Ion Integrated Research Experiment (IRE). We review the basic constraints which lead to a design and give examples of parameters and capabilities of an IRE. We also show design tradeoffs generated by the systems code IBEAM.

  3. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  4. Tank waste remediation system retrieval and disposal mission authorization basis amendment task plan

    SciTech Connect (OSTI)

    Goetz, T.G.

    1998-01-08

    This task plan is a documented agreement between Nuclear Safety and Licensing and the Process Development group within the Waste Feed Delivery organization. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Waste Delivery Program, Project W-211, and Project W-TBD.

  5. Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan

    Office of Scientific and Technical Information (OSTI)

    (Program Document) | SciTech Connect Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan Citation Details In-Document Search Title: Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan Clouds over the Southern Ocean are poorly represented in present day reanalysis products and global climate model simulations. Errors in top-of-atmosphere (TOA) broadband radiative fluxes in this region are among the largest globally, with large implications for modeling both

  6. Planning for an Integrated Research Experiment

    SciTech Connect (OSTI)

    Barnard, J.J.; Ahle, L.E.; Bangerter, R.O.; Bieniosek, F.M.; Celata, C.M.; Faltens, A.; Friedman, A.; Grote, D.P.; Haber, I.; Henestroza, E.; Kishek, R.A.; de Hoon, M.J.L.; Karpenko, V.P.; Kwan, J.W.; Lee, E.P.; Logan, B.G.; Lund, S.M.; Meier, W.R.; Molvik, A.W.; Sangster, T.C.; Seidl, P.A.; Sharp, W.M.

    2000-09-15

    The authors describe the goals and research program leading to the Heavy Ion Integrated Research Experiment (IRE). They review the basic constraints which lead to a design and give examples of parameters and capabilities of an IRE. We also show design tradeoffs generated by the systems code IBEAM. A multi-pronged Phase 1 research effort is laying the groundwork for the Integrated Research Experiment. Experiment, technology development, theory, simulation, and systems studies are all playing major roles in this Phase I research. The key research areas are: (1) Source and injector (for investigation of a high brightness, multiple beam, low cost injector); (2) High current transport (to examine effects at full driver-scale line charge density, including the maximization of the beam filling-factor and control of electrons); (3) Enabling technology development (low cost and high performance magnetic core material, superconducting magnetic quadrupole arrays, insulators, and pulsers); and (4) Beam simulations and theory (for investigations of beam matching, specification of accelerator errors, studies of emittance growth, halo, and bunch compression, in the accelerator, and neutralization methods, stripping effects, spot size minimization in the chamber); and (5) Systems optimization (minimization of cost and maximization of pulse energy and beam intensity). They have begun the process of designing, simulating, and optimizing the next major heavy-ion induction accelerator, the IRE. This accelerator facility will, in turn, help provide the basis to proceed to the next step in the development of IFE as an attractive source of fusion energy.

  7. Evolving treatment plan quality criteria from institution-specific experience

    SciTech Connect (OSTI)

    Ruan, D.; Shao, W.; DeMarco, J.; Tenn, S.; King, C.; Low, D.; Kupelian, P.; Steinberg, M.

    2012-05-15

    Purpose: The dosimetric aspects of radiation therapy treatment plan quality are usually evaluated and reported with dose volume histogram (DVH) endpoints. For clinical practicality, a small number of representative quantities derived from the DVH are often used as dose endpoints to summarize the plan quality. National guidelines on reference values for such quantities for some standard treatment approaches are often used as acceptance criteria to trigger treatment plan review. On the other hand, treatment prescription and planning approaches specific to each institution warrants the need to report plan quality in terms of practice consistency and with respect to institution-specific experience. The purpose of this study is to investigate and develop a systematic approach to record and characterize the institution-specific plan experience and use such information to guide the design of plan quality criteria. In the clinical setting, this approach will assist in (1) improving overall plan quality and consistency and (2) detecting abnormal plan behavior for retrospective analysis. Methods: The authors propose a self-evolving methodology and have developed an in-house prototype software suite that (1) extracts the dose endpoints from a treatment plan and evaluates them against both national standard and institution-specific criteria and (2) evolves the statistics for the dose endpoints and updates institution-specific criteria. Results: The validity of the proposed methodology was demonstrated with a database of prostate stereotactic body radiotherapy cases. As more data sets are accumulated, the evolving institution-specific criteria can serve as a reliable and stable consistency measure for plan quality and reveals the potential use of the ''tighter'' criteria than national standards or projected criteria, leading to practice that may push to shrink the gap between plans deemed acceptable and the underlying unknown optimality. Conclusions: The authors have developed

  8. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    SciTech Connect (OSTI)

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  9. The Sao Paulo Microtron: Equipment and Planned Experiments

    SciTech Connect (OSTI)

    Martins, M. N.; Maidana, N. L.; Vanin, V. R.

    2007-10-26

    The Linear Accelerator Laboratory (LAL) of the Instituto de Fisica da Universidade de Sao Paulo (IFUSP) is building a two-stage racetrack microtron, which will generate continuous wave electron beams with energies up to 38 MeV. This paper describes the characteristics of the accelerator, and reports on the experimental equipment that will be available in order to pursue the photonuclear physics research program. Operation will begin with the first stage (5 MeV), and concentrate on NRF (Nuclear Resonance Fluorescence) measurements and radiation physics studies. Planned experiments for the second stage explore the cw character of the beam on coincidence experiments. A photon tagger has been already tested with radioactive sources and is ready to be installed. Gamma and neutron detector arrays are being developed for the detailed study of photoneutron reactions. Plans include the study of NRF and pygmy resonances, near the neutron binding energy.

  10. Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    82 Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan RT Marchand SP Alexander A Protat December 2015 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

  11. Experiment operations plan for the TH-2 experiment in the NRU reactor. [PWR; BWR

    SciTech Connect (OSTI)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for TH-2--the second experiment in the series of thermal-hydraulic tests conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. The major objective of TH-2 was to develop the experiment reflood control parameters and the procedures to be used in subsequent experiments in this program. In this experiment, the data acquisition and control system was used to control the fuel cladding temperature during a simulated LOCA by using variable reflood coolant flow.

  12. Experiment operations plan for the MT-4 experiment in the NRU reactor. [PWR

    SciTech Connect (OSTI)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Marshall, R.K.; Hesson, G.M.; Webb, B.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for MT-4 - the fourth materials deformation experiment conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. A major objective of MT-4 was to simulate a pressurized water reactor LOCA that could induce fuel rod cladding deformation and rupture due to a short-term adiabatic transient and a peak fuel cladding temperature of 1200K (1700/sup 0/F).

  13. Planning the Next Generation of Arctic Ecosystem Experiments

    SciTech Connect (OSTI)

    Hinzman, Larry D [International Arctic Research Center; Wilson, Cathy [Los Alamos National Laboratory (LANL)

    2011-01-01

    Climate Change Experiments in High-Latitude Ecosystems; Fairbanks, Alaska, 13-14 October 2010; A 2-day climate change workshop was held at the International Arctic Research Center, University of Alaska Fairbanks. The workshop, sponsored by Biological and Environmental Research, Office of Science, U.S. Department of Energy (DOE), was attended by 45 subject matter experts from universities, DOE national laboratories, and other federal and nongovernmental organizations. The workshop sought to engage the Arctic science community in planning for a proposed Next-Generation Ecosystem Experiments (NGEE-Arctic) project in Alaska (http:// ngee.ornl.gov/). The goal of this activity is to provide data, theory, and models to improve representations of high-latitude terrestrial processes in Earth system models. In particular, there is a need to better understand the processes by which warming may drive increased plant productivity and atmospheric carbon uptake and storage in biomass and soils, as well as those processes that may drive an increase in the release of methane (CH{sub 4}) and carbon dioxide (CO{sub 2}) through microbial decomposition of soil carbon stored in thawing permafrost. This understanding is required to quantify the important feedback mechanisms that define the role of terrestrial processes in regional and global climate.

  14. Combined Retrieval, Microphysical Retrievals and Heating Rates

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Feng, Zhe

    2013-02-22

    Microphysical retrievals and heating rates from the AMIE/Gan deployment using the PNNL Combined Retrieval.

  15. Combined Retrieval, Microphysical Retrievals and Heating Rates

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Feng, Zhe

    Microphysical retrievals and heating rates from the AMIE/Gan deployment using the PNNL Combined Retrieval.

  16. ARM-99-005 Science and Experiment Plan Spring 1999 Flight Series

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM - UAV Atmospheric Radiation Measurement - Unmanned Aerospace Vehicle Science and Experiment Plan Spring 1999 Flight Series Robert Ellingson and Tim Tooman, eds. Version 1.2 - ...

  17. MRS Action Plan Task B report: Analyses of alternative designs and operating approaches for a Monitored Retrievable Storage Facility

    SciTech Connect (OSTI)

    Woods, W.D.; Jowdy, A.K.; Keehn, C.H.; Gale, R.M.; Smith, R.I.

    1988-12-01

    The Nuclear Waste Policy Amendments Act (NWPAA) instituted a number of changes in the DOE commercial nuclear waste management system. After passage of the Act, the DOE initiated a number of systems studies to reevaluate the role of Monitored Retrievable Storage (MRS) within the federal waste management system. This report summarizes the results of a study to determine the schedules and costs of developing those MRS facilities needed under a number of scenarios, with differing functions allocated to the MRS and/or different spent fuel acceptance schedules. Nine cases were defined for the system study, seven of which included an MRS Facility. The study cases or scenarios evaluated varied relative to the specific functions to be performed at the MRS. The scenarios ranged in magnitude from storage and shipment of bare, intact spent fuel to consolidating the spent fuel into repository emplacement containers prior to storage and shipment. Each scenario required specific modifications to be made to the design developed for the MRS proposal to Congress (the Conceptual Design Report). 41 figs., 326 tabs.

  18. Ganges Valley Aerosol Experiment: Science and Operations Plan

    SciTech Connect (OSTI)

    Kotamarthi, VR

    2010-06-21

    The Ganges Valley region is one of the largest and most rapidly developing sections of the Indian subcontinent. The Ganges River, which provides the region with water needed for sustaining life, is fed primarily by snow and rainfall associated with Indian summer monsoons. Impacts of changes in precipitation patterns, temperature, and the flow of the snow-fed rivers can be immense. Recent satellite-based measurements have indicated that the upper Ganges Valley has some of the highest persistently observed aerosol optical depth values. The aerosol layer covers a vast region, extending across the Indo-Gangetic Plain to the Bay of Bengal during the winter and early spring of each year. The persistent winter fog in the region is already a cause of much concern, and several studies have been proposed to understand the economic, scientific, and societal dimensions of this problem. During the INDian Ocean EXperiment (INDOEX) field studies, aerosols from this region were shown to affect cloud formation and monsoon activity over the Indian Ocean. This is one of the few regions showing a trend toward increasing surface dimming and enhanced mid-tropospheric warming. Increasing air pollution over this region could modify the radiative balance through direct, indirect, and semi-indirect effects associated with aerosols. The consequences of aerosols and associated pollution for surface insolation over the Ganges Valley and monsoons, in particular, are not well understood. The proposed field study is designed for use of (1) the ARM Mobile Facility (AMF) to measure relevant radiative, cloud, convection, and aerosol optical characteristics over mainland India during an extended period of 912 months and (2) the G-1 aircraft and surface sites to measure relevant aerosol chemical, physical, and optical characteristics in the Ganges Valley during a period of 612 weeks. The aerosols in this region have complex sources, including burning of coal, biomass, and biofuels; automobile

  19. Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan

    SciTech Connect (OSTI)

    Marchand, RT; Protat, A; Alexander, SP

    2015-12-01

    Clouds over the Southern Ocean are poorly represented in present day reanalysis products and global climate model simulations. Errors in top-of-atmosphere (TOA) broadband radiative fluxes in this region are among the largest globally, with large implications for modeling both regional and global scale climate responses (e.g., Trenberth and Fasullo 2010, Ceppi et al. 2012). Recent analyses of model simulations suggest that model radiative errors in the Southern Ocean are due to a lack of low-level postfrontal clouds (including clouds well behind the front) and perhaps a lack of supercooled liquid water that contribute most to the model biases (Bodas-Salcedo et al. 2013, Huang et al. 2014). These assessments of model performance, as well as our knowledge of cloud and aerosol properties over the Southern Ocean, rely heavily on satellite data sets. Satellite data sets are incomplete in that the observations are not continuous (i.e., they are acquired only when the satellite passes nearby), generally do not sample the diurnal cycle, and view primarily the tops of cloud systems (especially for the passive instruments). This is especially problematic for retrievals of aerosol, low-cloud properties, and layers of supercooled water embedded within (rather than at the top of) clouds, as well as estimates of surface shortwave and longwave fluxes based on these properties.

  20. Password Retriever

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAMD Home | Microfabrication Home Password Retriever Please, enter in your email address below and hit the Get Password button. Your UserID and password will be emailed to you ...

  1. Plains Elevated Convection at Night (PECAN) Experiment Science Plan

    SciTech Connect (OSTI)

    Turner, D; Parsons, D; Geerts, B

    2015-03-01

    The Plains Elevated Convection at Night (PECAN) experiment is a large field campaign that is being supported by the National Science Foundation (NSF) with contributions from the National Oceanic and Atmospheric Administration (NOAA), the National Atmospheric and Space Administration (NASA), and the U.S. Department of Energy (DOE). The overarching goal of the PECAN experiment is to improve the understanding and simulation of the processes that initiate and maintain convection and convective precipitation at night over the central portion of the Great Plains region of the United States (Parsons et al. 2013). These goals are important because (1) a large fraction of the yearly precipitation in the Great Plains comes from nocturnal convection, (2) nocturnal convection in the Great Plains is most often decoupled from the ground and, thus, is forced by other phenomena aloft (e.g., propagating bores, frontal boundaries, low-level jets [LLJ], etc.), (3) there is a relative lack of understanding how these disturbances initiate and maintain nocturnal convection, and (4) this lack of understanding greatly hampers the ability of numerical weather and climate models to simulate nocturnal convection well. This leads to significant uncertainties in predicting the onset, location, frequency, and intensity of convective cloud systems and associated weather hazards over the Great Plains.

  2. MTX (Microwave Tokamak Experiment) facility and machine grounding plan

    SciTech Connect (OSTI)

    Bell, H.H.; Rice, B.W.; Petersen, D.E.; Herrera, C.H.

    1987-10-07

    A key issue in the design of fusion research experiments and their related facilities is the control of ground currents. Because of the large magnetic field, high voltages and high currents present in most of these installations, it is essential to avoid ground loops, and to control ground currents during both normal operations and fault conditions. This paper describes the grounding policy that was developed for MTX. The vault area was divided into zones, and each of the four walls was treated as a separate grounding area. Cable runs and magnet buss bars were run into the machine radially. The paper also describes the steps taken to isolate diagnostic signals and power for pumps and instruments. The paper outlines some of the field calculations used to predict problem areas, and to reveal voltage isolation levels that were required. The paper includes the active ground fault detection system used to insure the integrity of the ground system. 2 refs., 5 figs.

  3. EM-21 Retrieval Knowledge Center: Waste Retrieval Challenges

    SciTech Connect (OSTI)

    Fellinger, Andrew P.; Rinker, Michael W.; Berglin, Eric J.; Minichan, Richard L.; Poirier, Micheal R.; Gauglitz, Phillip A.; Martin, Bruce A.; Hatchell, Brian K.; Saldivar, Eloy; Mullen, O Dennis; Chapman, Noel F.; Wells, Beric E.; Gibbons, Peter W.

    2009-04-10

    EM-21 is the Waste Processing Division of the Office of Engineering and Technology, within the U.S. Department of Energys (DOE) Office of Environmental Management (EM). In August of 2008, EM-21 began an initiative to develop a Retrieval Knowledge Center (RKC) to provide the DOE, high level waste retrieval operators, and technology developers with centralized and focused location to share knowledge and expertise that will be used to address retrieval challenges across the DOE complex. The RKC is also designed to facilitate information sharing across the DOE Waste Site Complex through workshops, and a searchable database of waste retrieval technology information. The database may be used to research effective technology approaches for specific retrieval tasks and to take advantage of the lessons learned from previous operations. It is also expected to be effective for remaining current with state-of-the-art of retrieval technologies and ongoing development within the DOE Complex. To encourage collaboration of DOE sites with waste retrieval issues, the RKC team is co-led by the Savannah River National Laboratory (SRNL) and the Pacific Northwest National Laboratory (PNNL). Two RKC workshops were held in the Fall of 2008. The purpose of these workshops was to define top level waste retrieval functional areas, exchange lessons learned, and develop a path forward to support a strategic business plan focused on technology needs for retrieval. The primary participants involved in these workshops included retrieval personnel and laboratory staff that are associated with Hanford and Savannah River Sites since the majority of remaining DOE waste tanks are located at these sites. This report summarizes and documents the results of the initial RKC workshops. Technology challenges identified from these workshops and presented here are expected to be a key component to defining future RKC-directed tasks designed to facilitate tank waste retrieval solutions.

  4. ARESE (ARM Enhanced Shortwave Experiment) Science Plan [Atmospheric Radiation Program

    SciTech Connect (OSTI)

    Valero, F.P.J.; Schwartz, S.E.; Cess, R.D.; Ramanathan, V.; Collins, W.D.; Minnis, P.; Ackerman, T.P.; Vitko, J.; Tooman, T.P.

    1995-09-27

    Several recent studies have indicated that cloudy atmospheres may absorb significantly more solar radiation than currently predicted by models. The magnitude of this excess atmospheric absorption, is about 50% more than currently predicted and would have major impact on our understanding of atmospheric heating. Incorporation of this excess heating into existing general circulation models also appears to ameliorate some significant shortcomings of these models, most notably a tendency to overpredict the amount of radiant energy going into the oceans and to underpredict the tropopause temperature. However, some earlier studies do not show this excess absorption and an underlying physical mechanism that would give rise to such absorption has yet to be defined. Given the importance of this issue, the Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) program is sponsoring the ARM Enhanced Shortwave Experiment (ARESE) to study the absorption of solar radiation by clear and cloudy atmospheres. The experimental results will be compared with model calculations. Measurements will be conducted using three aircraft platforms (ARM-UAV Egrett, NASA ER-2, and an instrumented Twin Otter), as well as satellites and the ARM central and extended facilities in North Central Oklahoma. The project will occur over a four week period beginning in late September, 1995. Spectral broadband, partial bandpass, and narrow bandpass (10nm) solar radiative fluxes will be measured at different altitudes and at the surface with the objective to determine directly the magnitude and spectral characteristics of the absorption of shortwave radiation by the atmosphere (clear and cloudy). Narrow spectral channels selected to coincide with absorption by liquid water and ice will help in identifying the process of absorption of radiation. Additionally, information such as water vapor profiles, aerosol optical depths, cloud structure and ozone profiles, needed to use as input in radiative

  5. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  6. Integrating impact assessment and conflict management in urban planning: Experiences from Finland

    SciTech Connect (OSTI)

    Peltonen, Lasse; Sairinen, Rauno

    2010-09-15

    The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impact assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.

  7. Virtual LIDAR Model Helps Researchers Plan for Wake Steering Experiment at

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWiFT Model Helps Researchers Plan for Wake Steering Experiment at SWiFT - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear

  8. Virtual LIDAR model helps researchers plan for the Wake Steering Experiment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at SWiFT model helps researchers plan for the Wake Steering Experiment at SWiFT - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing

  9. Hanford Tank Waste Retrieval,

    Office of Environmental Management (EM)

    Tank Waste Retrieval, Treatment, and Disposition Framework September 24, 2013 U.S. Department of Energy Washington, D.C. 20585 Hanford Tank Waste Retrieval, Treatment, and ...

  10. Retrieval Activities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Farms Retrieval Activities Office of River Protection Tank Farms Retrieval Activities PHOENIX - Tank Monitoring Waste Treatment & Immobilization Plant 222-S Laboratory 242-A...

  11. NSR Key Number Retrieval

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NSR Key Number Retrieval Pease enter key in the box Submit

  12. Single-shell tank retrieval program mission analysis report

    SciTech Connect (OSTI)

    Stokes, W.J.

    1998-08-11

    This Mission Analysis Report was prepared to provide the foundation for the Single-Shell Tank (SST) Retrieval Program, a new program responsible for waste removal for the SSTS. The SST Retrieval Program is integrated with other Tank Waste Remediation System activities that provide the management, technical, and operations elements associated with planning and execution of SST and SST Farm retrieval and closure. This Mission Analysis Report provides the basis and strategy for developing a program plan for SST retrieval. This Mission Analysis Report responds to a US Department of Energy request for an alternative single-shell tank retrieval approach (Taylor 1997).

  13. STORMVEX: The Storm Peak Lab Cloud Property Validation Experiment Science and Operations Plan

    SciTech Connect (OSTI)

    Mace, J; Matrosov, S; Shupe, M; Lawson, P; Hallar, G; McCubbin, I; Marchand, R; Orr, B; Coulter, R; Sedlacek, A; Avallone, L; Long, C

    2010-09-29

    During the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX), a substantial correlative data set of remote sensing observations and direct in situ measurements from fixed and airborne platforms will be created in a winter season, mountainous environment. This will be accomplished by combining mountaintop observations at Storm Peak Laboratory and the airborne National Science Foundation-supported Colorado Airborne Multi-Phase Cloud Study campaign with collocated measurements from the second ARM Mobile Facility (AMF2). We describe in this document the operational plans and motivating science for this experiment, which includes deployment of AMF2 to Steamboat Springs, Colorado. The intensive STORMVEX field phase will begin nominally on 1 November 2010 and extend to approximately early April 2011.

  14. A detection-level hazardous waste ground-water monitoring compliance plan for the 200 areas low-level burial grounds and retrievable storage units

    SciTech Connect (OSTI)

    Not Available

    1987-02-01

    This plan defines the actions needed to achieve detection-level monitoring compliance at the Hanford Site 200 Areas Low-Level Burial Grounds (LLBG) in accordance with the Resource Conservation and Recovery Act (RCRA). Compliance will be achieved through characterization of the hydrogeology and monitoring of the ground water beneath the LLBG located in the Hanford Site 200 Areas. 13 refs., 20 figs.

  15. Fuel Retrieval System Design Verification Report

    SciTech Connect (OSTI)

    GROTH, B.D.

    2000-04-11

    The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway. Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR). A Design Verification Status Questionnaire, Table 1, is included which addresses Corrective Action SNF-EG-MA-EG-20000060, Item No.9 (Miller 2000).

  16. ARM - PI Product - Combined Retrieval, Microphysical Retrievals & Heating

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates ProductsCombined Retrieval, Microphysical Retrievals & Heating Rates ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Combined Retrieval, Microphysical Retrievals & Heating Rates [ research data - ASR funded ] The PNNL Combined Remote Sensor retrieval algorithm (CombRet) is designed to retrieve cloud and precipitation properties for all sky conditions. The retrieval is based on a

  17. Fuel Retrieval System (FRS) Design Verification

    SciTech Connect (OSTI)

    YANOCHKO, R.M.

    2000-01-27

    This document was prepared as part of an independent review to explain design verification activities already completed, and to define the remaining design verification actions for the Fuel Retrieval System. The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR).

  18. SU-E-T-413: Experience-Based VMAT Plan Quality Database

    SciTech Connect (OSTI)

    Bernstein, K; Kalach, N; Wolthuis, B; Tai, C; Kravchuk, A; Bernstein, E

    2014-06-01

    Purpose: To quantify VMAT plan quality using a retrospective study of over 200 clinical treated VMAT plans created using the Eclipse Treatment Planning System to create benchmarks of plan quality for a few categories of treatment sites. Methods: Using a controlled phantom geometry, various dosimetric indices were investigated to quantify dosimetric plan quality as a function of isocenter displacement from center of mass, average path length, number of arcs and PTV proximity to critical structures. Beginning with published dosimetry indices from SRS and SBRT evaluations, UDI (Unified Dosimetry Index) and modified UDI were tested before creating a new factor VMAT-DI. VMAT-DI was developed within boundaries of this project and it includes renormalized factors of conformity index, coverage index, modified gradient index and homogeneity index as well as indices based on routine clinical practice such as absolute dose max index. The plans were then evaluated using the VMAT-DI such that benchmarks for planning could be created. Results: The majority of the plans evaluated could be assigned VMAT-DI values within a range for each treatment site. However, the outliers were results of difficult planning parameters such as very irregular targets, inhomogeneities or difficult to achieve critical structure constraints. To effectively use VMAT-DI for guidance, especially for prediction of the plan quality for body sites new to the practice, VMATDI database needs to be subdivided by target complexity and by body site index/average path length factor. Conclusion: An experienced-based VMAT-DI database can be used to help analyze plans before evaluation by the physician to show that it adheres to the clinical standards of previously treated VMAT plans which will make a guideline for concluding the optimization. The introduction of institution-wide clinical planning protocols, standardizing OAR naming and constraints will make it possible to incorporate a cumulative critical structure

  19. Efficient Graffiti Image Retrieval

    SciTech Connect (OSTI)

    Yang, Chunlei; Wong, Pak C.; Ribarsky, William; Fan, Jianping

    2012-07-05

    Research of graffiti character recognition and retrieval, as a branch of traditional optical character recognition (OCR), has started to gain attention in recent years. We have investigated the special challenge of the graffiti image retrieval problem and propose a series of novel techniques to overcome the challenges. The proposed bounding box framework locates the character components in the graffiti images to construct meaningful character strings and conduct image-wise and semantic-wise retrieval on the strings rather than the entire image. Using real world data provided by the law enforcement community to the Pacific Northwest National Laboratory, we show that the proposed framework outperforms the traditional image retrieval framework with better retrieval results and improved computational efficiency.

  20. Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Burman, S.N.; Uziel, M.S.

    1995-12-01

    The Lockheed Martin Energy Systems, Inc., (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of the policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  1. Retrieval options study

    SciTech Connect (OSTI)

    Not Available

    1980-03-01

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval; (same as emplacement, variably slower depending on repository/canister condition).

  2. Dose planning objectives in anal canal cancer IMRT: the TROG ANROTAT experience

    SciTech Connect (OSTI)

    Brown, Elizabeth; Cray, Alison; Haworth, Annette; Chander, Sarat; Lin, Robert; Subramanian, Brindha; Ng, Michael

    2015-06-15

    Intensity modulated radiotherapy (IMRT) is ideal for anal canal cancer (ACC), delivering high doses to irregular tumour volumes whilst minimising dose to surrounding normal tissues. Establishing achievable dose objectives is a challenge. The purpose of this paper was to utilise data collected in the Assessment of New Radiation Oncology Treatments and Technologies (ANROTAT) project to evaluate the feasibility of ACC IMRT dose planning objectives employed in the Australian situation. Ten Australian centres were randomly allocated three data sets from 15 non-identifiable computed tomography data sets representing a range of disease stages and gender. Each data set was planned by two different centres, producing 30 plans. All tumour and organ at risk (OAR) contours, prescription and dose constraint details were provided. Dose–volume histograms (DVHs) for each plan were analysed to evaluate the feasibility of dose planning objectives provided. All dose planning objectives for the bone marrow (BM) and femoral heads were achieved. Median planned doses exceeded one or more objectives for bowel, external genitalia and bladder. This reached statistical significance for bowel V30 (P = 0.04), V45 (P < 0.001), V50 (P < 0.001), external genitalia V20 (P < 0.001) and bladder V35 (P < 0.001), V40 (P = 0.01). Gender was found to be the only significant factor in the likelihood of achieving the bowel V50 (P = 0.03) and BM V30 constraints (P = 0.04). The dose planning objectives used in the ANROTAT project provide a good starting point for ACC IMRT planning. To facilitate clinical implementation, it is important to prioritise OAR objectives and recognise factors that affect the achievability of these objectives.

  3. Engineering test plan for field radionuclide migration experiments in climax granite

    SciTech Connect (OSTI)

    Isherwood, D.; Raber, E.; Stone, R.; Lord, D.; Rector, N.; Failor, R.

    1982-05-01

    This Engineering Test Plan (ETP) describes field studies of radionuclide migration in fractured rock designed for the Climax grainite at the Nevada Test Site. The purpose of the ETP is to provide a detailed written document of the method of accomplishing these studies. The ETP contains the experimental test plans, an instrumentation plan, system schematics, a description of the test facility, and a brief outline of the laboratory support studies needed to understand the chemistry of the rock/water/radionuclide interactions. Results of our initial hydrologic investigations are presented along with pretest predictions based on the hydrologic test results.

  4. Monitored Retrievable Storage Background

    Broader source: Energy.gov [DOE]

    `The U.S. Government is seeking a site for a monitored retrievable storage facility (MRS). Employing proven technologies used in this country and abroad, the MRS will be an Integral part of the...

  5. Environmental planning as a tool for economic development: The black brook watershed experience

    SciTech Connect (OSTI)

    Ryner, P.C.; Heller, G.B.

    1995-12-01

    The Keene, New Hampshire Planning Department has attempted to use environmental planning as a tool to facilitate industrial development of the Black Brook Watershed. The City has established detailed modeling of drainage, floodplains and groundwater, and has placed that information on accurate computer-based maps. When provided to developers at the beginning of the development process, this environmental information expidites design and permitting while also improving the likelihood of protecting sensitive environmental areas. Starting in 1987 as part of a Master Plan revision process, the Planning Department decided to concentrate on the Black Brook Watershed in northwestern Keene as a target area for a new approach to economic development and environmental protection. The entire watershed was chosen as the boundary for this study area and detailed studies were conducted. During this effort the City formulated a new Economic Development Master Plan which called for the creation of approximately 300 acres of new industrial development within the next ten years. The Black Brook basin was identified as the preferred site. Because of pro-active environmental planning, the City is now able to work in active, cooperative partnership with the private sector in the development of this area. It is clear from this first specific development project that the project development and permitting process will be shortened by at least 60 days, and a minimum of $5,000 to $10,000 in preliminary site information costs will be saved. The availability of good information on wetlands and floodplains has already had a dramatic impact upon proposed site design and has achieved the desired objective of avoiding these sensitive areas whenever possible. The City is now working on the design of an Industrial Design and Permitting System which will be applied to the entire City, based upon what has been learned from this effort.

  6. Quality assurance plan for the molten salt reactor experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-02-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by Molten Salt Reactor Experiment (MSRE) Remediation Project personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description, Y/QD-15 Rev. 2 (Martin Marietta Energy Systems, Inc., 1995) and Environmental Management and Enrichment Facilities Work Smart Standards. This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRE Remediation Project. This QAP will be periodically reviewed, revised, and approved as necessary. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  7. Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information

    Open Energy Info (EERE)

    Mitigation Action Plans and Scenarios (MAPS) (Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) Jump to: navigation, search Retrieved from "http:...

  8. ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks-Egypt-Low Carbon Growth Planning Support Redirect page Jump to: navigation, search REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:...

  9. South Africa-National Development Plan: Vision for 2030 | Open...

    Open Energy Info (EERE)

    Development Plan" Retrieved from "http:en.openei.orgwindex.php?titleSouthAfrica-NationalDevelopmentPlan:Visionfor2030&oldid391220" Feedback Contact needs...

  10. Status of the direct absorption receiver panel research experiment: Salt flow and solar test requirements and plans

    SciTech Connect (OSTI)

    Tyner, C.E.

    1989-03-01

    The Panel Research Experiment (PRE) is the first large-scale solar test of the molten nitrate salt direct absorption receiver (DAR) concept. The purpose of the PRE is to demonstrate the engineering feasibility and practicality of the DAR. We will conduct the test at the Central Receiver Test Facility in Albuquerque in two phases: salt flow testing and solar testing. This is a working document to define PRE test objectives and requirements, document the test hardware design, and define test plans. 13 refs., 12 figs., 1 tab.

  11. Status and Planned Experiments of the Hiradmat Pulsed Beam Material Test Facility at CERN SPS

    SciTech Connect (OSTI)

    Charitonidis, Nikolaos; Efthymiopoulos, Ilias; Fabich, Adrian; Meddahi, Malika; Gianfelice-Wendt, Eliana

    2015-06-01

    HiRadMat (High Irradiation to Materials) is a facility at CERN designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies (e.g. vacuum windows, shock tests on high power targets, collimators) can be tested. The beam parameters (SPS 440 GeV protons with a pulse energy of up to 3.4 MJ, or alternatively lead/argon ions at the proton equivalent energy) can be tuned to match the needs of each experiment. It is a test area designed to perform single pulse experiments to evaluate the effect of high-intensity pulsed beams on materials in a dedicated environment, excluding long-time irradiation studies. The facility is designed for a maximum number of 1016 protons per year, in order to limit the activation of the irradiated samples to acceptable levels for human intervention. This paper will demonstrate the possibilities for research using this facility and go through examples of upcoming experiments scheduled in the beam period 2015/2016.

  12. Recent experience in planning, packaging and preparing noncommercial spent fuel for shipment in the United States

    SciTech Connect (OSTI)

    Shappert, L.B.; Parks, C.V.; Turner, D.W.; Aramayo, G.A.

    1998-05-01

    The US Department of Energy-Headquarters (DOE-HQ) has issued a Record of Decision (ROD) which identified the plan to be followed in managing spent nuclear fuel (SNF) belonging to the Department. As a result, the aluminum-clad fuels stored at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, were directed to be shipped to the Savannah River Site (SRS) near Aiken, South Carolina. The BMI-1 cask was chosen to make the shipments of SNF from dry storage that had to be placed in canisters. However, the Certificate of Compliance (COC) for the BMI-1 cask limited the fissile material loading to 800 g of unirradiated fissile material for the cask configuration chosen. Because about half of the canisters were already filled and sealed with more fissile material than was permitted by the COC, approval to make these shipments in the BMI-1 was requested from the Nuclear Regulatory Commission (NRC). A safety analysis showed that the shipments could be made safely under the conditions identified. The waiver was granted in September 1997 and the three shipments were successfully completed in January 1998.

  13. REMOTE RETRIEVING TOOL

    DOE Patents [OSTI]

    Fromm, L.W. Jr.

    1958-08-19

    A retrieving tool is described to securely grasp an object for emplacement in, or withdrawal from, an elongated tube. The object is grasped by hooks actuated by a wedge and cann mechanism. The mechanism on the end of a long rodlike structure is controlled by levers or bars at the access end of the tube. This device is particularly useful for positioning fuel elements within a reactor core.

  14. Storing and Retrieving Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage/Handling Storage/Handling Records Management Procedures for Storage, Transfer & Retrieval of Records from the Washington National Records Center (WNRC) or Legacy Management Business Center RETIREMENT OF RECORDS: 1. The Program Office originates the Records Transmittal and Receipt Form SF-135 (PDF, 107KB), and sends it to IM-23 at doerm@hq.doe.gov for approval. 2. IM-23 reviews the SF-135 for completeness/correctness and coordinates with the originating office by email if more

  15. ARM MJO Investigation Experiment on Gan Island (AMIE-Gan) Science Plan

    SciTech Connect (OSTI)

    Long, CL; Del Genio, A; Deng, M; Fu, X; Gustafson, W; Houze, R; Jakob, C; Jensen, M; Johnson, R; Liu, X; Luke, E; May, P; McFarlane, S; Minnis, P; Schumacher, C; Vogelmann, A; Wang, Y; Webster, P; Xie, S; Zhang, C

    2011-04-11

    The overarching campaign, which includes the ARM Mobile Facility 2 (AMF2) deployment in conjunction with the Dynamics of the Madden-Julian Oscillation (DYNAMO) and the Cooperative Indian Ocean experiment on intraseasonal variability in the Year 2011 (CINDY2011) campaigns, is designed to test several current hypotheses regarding the mechanisms responsible for Madden-Julian Oscillation (MJO) initiation and propagation in the Indian Ocean area. The synergy between the proposed AMF2 deployment with DYNAMO/CINDY2011, and the corresponding funded experiment on Manus, combine for an overarching ARM MJO Investigation Experiment (AMIE) with two components: AMF2 on Gan Island in the Indian Ocean (AMIE-Gan), where the MJO initiates and starts its eastward propagation; and the ARM Manus site (AMIE-Manus), which is in the general area where the MJO usually starts to weaken in climate models. AMIE-Gan will provide measurements of particular interest to Atmospheric System Research (ASR) researchers relevant to improving the representation of MJO initiation in climate models. The framework of DYNAMO/CINDY2011 includes two proposed island-based sites and two ship-based locations forming a square pattern with sonde profiles and scanning precipitation and cloud radars at both island and ship sites. These data will be used to produce a Variational Analysis data set coinciding with the one produced for AMIE-Manus. The synergy between AMIE-Manus and AMIE-Gan will allow studies of the initiation, propagation, and evolution of the convective cloud population within the framework of the MJO. As with AMIE-Manus, AMIE-Gan/DYNAMO also includes a significant modeling component geared toward improving the representation of MJO initiation and propagation in climate and forecast models. This campaign involves the deployment of the second, marine-capable, AMF; all of the included measurement systems; and especially the scanning and vertically pointing radars. The campaign will include sonde

  16. APEX: A Prime EXperiment at Jefferson Lab - Test Run Results and Full Run Plans; Update

    SciTech Connect (OSTI)

    Beacham, James

    2015-06-01

    APEX is an experiment at Thomas Jefferson National Accelerator Facility (JLab) in Virginia, USA, that searches for a new gauge boson (A') with sub-GeV mass and coupling to ordinary matter of g' ~ (10-6 - 10⁻²)e. Electrons impinge upon a fixed target of high-Z material. An A' is produced via a process analogous to photon bremsstrahlung, decaying to an e⁺+e⁻ pair. A test run was held in July of 2010, covering mA' = 175 to 250 MeV and couplings g'/e > 10⁻³. A full run is approved and will cover mA' ~ 65 to 525 MeV and g'/e > 2.3 x 10⁻⁴, and is expected to occur sometime in 2016 or 2017.

  17. Decision analysis of Hanford underground storage tank waste retrieval systems

    SciTech Connect (OSTI)

    Merkhofer, M.W.; Bitz, D.A.; Berry, D.L.; Jardine, L.J.

    1994-05-01

    A decision analysis approach has been proposed for planning the retrieval of hazardous, radioactive, and mixed wastes from underground storage tanks. This paper describes the proposed approach and illustrates its application to the single-shell storage tanks (SSTs) at Hanford, Washington.

  18. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  19. Environmental health and safety plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Burman, S.N.; Tiner, P.F.; Gosslee, R.C.

    1998-01-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to environmental protection and safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  20. Unvented Drum Handling Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-08-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  1. Radiation Therapy Planning for Early-Stage Hodgkin Lymphoma: Experience of the International Lymphoma Radiation Oncology Group

    SciTech Connect (OSTI)

    Maraldo, Maja V.; Dabaja, Bouthaina S.; Filippi, Andrea R.; Illidge, Tim; Tsang, Richard; Ricardi, Umberto; Petersen, Peter M.; Schut, Deborah A.; Garcia, John; Headley, Jayne; Parent, Amy; Guibord, Benoit; Ragona, Riccardo; Specht, Lena

    2015-05-01

    Purpose: Early-stage Hodgkin lymphoma (HL) is a rare disease, and the location of lymphoma varies considerably between patients. Here, we evaluate the variability of radiation therapy (RT) plans among 5 International Lymphoma Radiation Oncology Group (ILROG) centers with regard to beam arrangements, planning parameters, and estimated doses to the critical organs at risk (OARs). Methods: Ten patients with stage I-II classic HL with masses of different sizes and locations were selected. On the basis of the clinical information, 5 ILROG centers were asked to create RT plans to a prescribed dose of 30.6 Gy. A postchemotherapy computed tomography scan with precontoured clinical target volume (CTV) and OARs was provided for each patient. The treatment technique and planning methods were chosen according to each center's best practice in 2013. Results: Seven patients had mediastinal disease, 2 had axillary disease, and 1 had disease in the neck only. The median age at diagnosis was 34 years (range, 21-74 years), and 5 patients were male. Of the resulting 50 treatment plans, 15 were planned with volumetric modulated arc therapy (1-4 arcs), 16 with intensity modulated RT (3-9 fields), and 19 with 3-dimensional conformal RT (2-4 fields). The variations in CTV-to-planning target volume margins (5-15 mm), maximum tolerated dose (31.4-40 Gy), and plan conformity (conformity index 0-3.6) were significant. However, estimated doses to OARs were comparable between centers for each patient. Conclusions: RT planning for HL is challenging because of the heterogeneity in size and location of disease and, additionally, to the variation in choice of treatment techniques and field arrangements. Adopting ILROG guidelines and implementing universal dose objectives could further standardize treatment techniques and contribute to lowering the dose to the surrounding OARs.

  2. OAR - Division 100-Wildlife Diversity Plan | Open Energy Information

    Open Energy Info (EERE)

    availability: http:crossref.org Citation Retrieved from "http:en.openei.orgwindex.php?titleOAR-Division100-WildlifeDiversityPlan&oldid792434" Feedback Contact...

  3. Guidelines for Low Emission Land use Planning | Open Energy Informatio...

    Open Energy Info (EERE)

    and will provide guidance and the integration of a range of tools to develop REDD+ strategy documents or low emissions plans for AFOLU. References Retrieved from "http:...

  4. Mexico-IAEA Energy Planning | Open Energy Information

    Open Energy Info (EERE)

    IAEA is working with Mexico to Support Medium and Long Term Planning for the Expansion of Electricity Generation Capacity. References "IAEA Project database - Mexico" Retrieved...

  5. Cote d'Ivoire IAEA Energy Planning | Open Energy Information

    Open Energy Info (EERE)

    "IAEA Project Database" Retrieved from "http:en.openei.orgwindex.php?titleCoted%27IvoireIAEAEnergyPlanning&oldid328577" Feedback Contact needs updating Image...

  6. Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiments - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy

  7. CHALLENGES WITH RETRIEVING TRANSURANIC WASTE FROM THE HANFORD BURIAL GROUNDS

    SciTech Connect (OSTI)

    SWAN, R.J.; LAKES, M.E.

    2007-08-06

    The U.S. DOE's Hanford Reservation produced plutonium and other nuclear materials for the nation's defense starting in World War II. The defense mission generated wastes that were either retrievably stored (i.e. retrievably stored waste) and/or disposed of in burial grounds. Challenges have emerged from retrieving suspect TRU waste including adequacy of records, radiological concerns, container integrity, industrial hygiene and safety issues, the lack of processing/treatment facilities, and the integration of regulatory requirements. All retrievably stored waste is managed as mixed waste and assumed to be TRU waste, unless documented otherwise. Mixed waste is defined as radioactive waste that contains hazardous constituents. The Atomic Energy Act governs waste with radionuclides, and the Resource Conservation and Recovery Act (RCRA) governs waste with hazardous constituents. Waste may also be governed by the Toxic Substances Control Act (TSCA), and a portion may be managed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In 1970, TRU waste was required to be placed in 20-year retrievable storage and segregated from other Waste. Prior to that date, segregation did not occur. Because of the changing definition of TRU over the years, and the limitations of early assay equipment, all retrievably stored waste in the burial grounds is managed as suspect TRU. Experience has shown that some of this waste will be characterized as low-level (non-TRU) waste after assay. The majority of the retrieved waste is not amenable to sampling due to waste type and/or radiological issues. Key to waste retrieval and disposition are characterization, historical investigation and research, knowledge of past handling and packaging, as well as a broad understanding and application of the regulations.

  8. Experiment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MiniBooNE Experiment September, 2002 SeptemMyungkee Sung (LSU/MiniBooNE) 4th International Workshop on the Identification of Dark Matter Cosmologically Interesting Region; Hot Dark Matter? LSND Signal at High ∆m 2 KARMEN II narrowed the signal region MiniBooNE will fully address this signal. Neutrino Osillation at High ∆m 2 LSND: Searching for ν µ →ν e ν µ - From µ + decay at rest with endpoint energy 53 MeV L = 30m, L/E ~ 1m/MeV, 167 tons of Mineral Oil Look for ν e Appearance: ν

  9. Multimedia Information Retrieval Literature Review

    SciTech Connect (OSTI)

    Wong, Pak C.; Bohn, Shawn J.; Payne, Deborah A.

    2010-10-12

    This survey paper highlights some of the recent, influential work in multimedia information retrieval (MIR). MIR is a branch area of multimedia (MM). The young and fast-growing area has received strong industrial and academic support in the United States and around the world (see Section 7 for a list of major conferences and journals of the community). The term "information retrieval" may be misleading to those with different computer science or information technology backgrounds. As shown in our discussion later, it indeed includes topics from user interaction, data analytics, machine learning, feature extraction, information visualization, and more.

  10. Phase 2, Solid waste retrieval strategy

    SciTech Connect (OSTI)

    Johnson, D.M.

    1994-09-29

    Solid TRU retrieval, Phase 1 is scheduled to commence operation in 1998 at 218W-4C-T01 and complete recovery of the waste containers in 2001. Phase 2 Retrieval will recover the remaining buried TRU waste to be retrieved and provide the preliminary characterization by non-destructive means to allow interim storage until processing for disposal. This document reports on researching the characterization documents to determine the types of wastes to be retrieved and where located, waste configurations, conditions, and required methods for retrieval. Also included are discussions of wastes encompassed by Phase 2 for which there are valid reasons to not retrieve.

  11. Cloud-Scale Vertical Velocity and Turbulent Dissipation Rate Retrievals

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Shupe, Matthew

    Time-height fields of retrieved in-cloud vertical wind velocity and turbulent dissipation rate, both retrieved primarily from vertically-pointing, Ka-band cloud radar measurements. Files are available for manually-selected, stratiform, mixed-phase cloud cases observed at the North Slope of Alaska (NSA) site during periods covering the Mixed-Phase Arctic Cloud Experiment (MPACE, late September through early November 2004) and the Indirect and Semi-Direct Aerosol Campaign (ISDAC, April-early May 2008). These time periods will be expanded in a future submission.

  12. Cloud-Scale Vertical Velocity and Turbulent Dissipation Rate Retrievals

    SciTech Connect (OSTI)

    Shupe, Matthew

    2013-05-22

    Time-height fields of retrieved in-cloud vertical wind velocity and turbulent dissipation rate, both retrieved primarily from vertically-pointing, Ka-band cloud radar measurements. Files are available for manually-selected, stratiform, mixed-phase cloud cases observed at the North Slope of Alaska (NSA) site during periods covering the Mixed-Phase Arctic Cloud Experiment (MPACE, late September through early November 2004) and the Indirect and Semi-Direct Aerosol Campaign (ISDAC, April-early May 2008). These time periods will be expanded in a future submission.

  13. Can I solve my structure by SAD phasing? Planning an experiment, scaling data and evaluating the useful anomalous correlation and anomalous signal

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Terwilliger, Thomas C.; Bunkóczi, Gábor; Hung, Li-Wei; Zwart, Peter H.; Smith, Janet L.; Akey, David L.; Adams, Paul D.

    2016-03-01

    A key challenge in the SAD phasing method is solving a structure when the anomalous signal-to-noise ratio is low. Here, we describe algorithms and tools for evaluating and optimizing the useful anomalous correlation and the anomalous signal in a SAD experiment. A simple theoretical framework [Terwilliger et al.(2016),Acta Cryst.D72, 346–358] is used to develop methods for planning a SAD experiment, scaling SAD data sets and estimating the useful anomalous correlation and anomalous signal in a SAD data set. Thephenix.plan_sad_experimenttool uses a database of solved and unsolved SAD data sets and the expected characteristics of a SAD data set to estimatemore » the probability that the anomalous substructure will be found in the SAD experiment and the expected map quality that would be obtained if the substructure were found. Thephenix.scale_and_mergetool scales unmerged SAD data from one or more crystals using local scaling and optimizes the anomalous signal by identifying the systematic differences among data sets, and thephenix.anomalous_signaltool estimates the useful anomalous correlation and anomalous signal after collecting SAD data and estimates the probability that the data set can be solved and the likely figure of merit of phasing.« less

  14. Early Commissioning Experience and Future Plans for the 12 GeV Continuous Electron Beam Accelerator Facility

    SciTech Connect (OSTI)

    Spata, Michael F.

    2014-12-01

    Jefferson Lab has recently completed the accelerator portion of the 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility. All 52 SRF cryomodules have been commissioned and operated with beam. The initial beam transport goals of demonstrating 2.2 GeV per pass, greater than 6 GeV in 3 passes to an existing experimental facility and greater than 10 GeV in 5-1/2 passes have all been accomplished. These results along with future plans to commission the remaining beamlines and to increase the performance of the accelerator to achieve reliable, robust and efficient operations at 12 GeV are presented.

  15. Energy Planning

    Broader source: Energy.gov (indexed) [DOE]

    Energy Planning Agenda * What is energy planning? * The process * The plan * Strategic Energy Planning (SEP) Workbook * Other resources 2 What is Energy Planning? * Brings desired ...

  16. Planning for hybrid-cycle OTEC experiments using the HMTSTA test facility at the Natural Energy Laboratory of Hawaii

    SciTech Connect (OSTI)

    Panchal, C.; Rabas, T.; Genens, L.

    1989-01-01

    The US Department of Energy has built an experimental apparatus for studying the open-cycle Ocean Thermal Energy Conversion (OC-OTEC) system. Experiments using warm and cold seawater are currently uderway to validate the performance predictions for an OC-TEC flash evaporator, surface condenser, and direct-contact condenser. The hybrid cycle is another OTEC option that produces both power and desalinated water, it is comparable in capital cost to OC-OTEC, and it eliminates the problems associated with the large steam turbine. Means are presented in this paper for modifying the existing apparatus to conduct similar experiments on hybrid-cycle OTEC heat exchangers. These data are required to validate predictive methods of the components and for the system integration that were identified in an earlier study of hybrid-cycle OTEC power plants. 7 refs., 4 figs., 2 tabs.

  17. AMIE (ARM MJO Investigation Experiment): Observations of the Madden-Julian Oscillation for Modeling Studies Science Plan

    SciTech Connect (OSTI)

    Long, C; Del Genio, A; Gustafson, W; Houze, R; Jakob, C; Jensen, M; Klein, S; Leung, L Ruby; Liu, X; Luke, E; May, P; McFarlane, S; Minnis, P; Schumacher, C; Vogelmann, A; Wang, Y; Wu, X; Xie, S

    2010-03-22

    Deep convection in the tropics plays an important role in driving global circulations and the transport of energy from the tropics to the mid-latitudes. Understanding the mechanisms that control tropical convection is a key to improving climate modeling simulations of the global energy balance. One of the dominant sources of tropical convective variability is the Madden-Julian Oscillation (MJO), which has a period of approximately 30–60 days. There is no agreed-upon explanation for the underlying physics that maintain the MJO. Many climate models do not show well-defined MJO signals, and those that do have problems accurately simulating the amplitude, propagation speed, and/or seasonality of the MJO signal. Therefore, the MJO is a very important modeling target for the ARM modeling community geared specifically toward improving climate models. The ARM MJO Investigation Experiment (AMIE) period coincides with a large international MJO initiation field campaign called CINDY2011 (Cooperative Indian Ocean experiment on intraseasonal variability in the Year 2011) that will take place in and around the Indian Ocean from October 2011 to January 2012. AMIE, in conjunction with CINDY2011 efforts, will provide an unprecedented data set that will allow investigation of the evolution of convection within the framework of the MJO. AMIE observations will also complement the long-term MJO statistics produced using ARM Manus data and will allow testing of several of the current hypotheses related to the MJO phenomenon. Taking advantage of the expected deployment of a C-POL scanning precipitation radar and an ECOR surface flux tower at the ARM Manus site, we propose to increase the number of sonde launches to eight per day starting in about mid-October of the field experiment year, which is climatologically a period of generally suppressed conditions at Manus and just prior to the climatologically strongest MJO period. The field experiment will last until the end of the MJO

  18. Study to develop an inspection, maintenance, and repair plan for OTEC (Ocean Thermal Energy Conversion) modular experiment plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The inspection, maintenance and repair (IM and R) of the Ocean Thermal Energy Conversion (OTEC) Modular Experiment Plant (Pilot Plant) have been studied in two phases: Task I and Task II. Task I phase developed IM and R identification forms, identified requirements for routine and post casualty IM and R, and categorized and outlined potential procedures to perform IM and R activities. The efforts of the Task II phase have been directed to meet the following objectives: to provide feedback to the OTEC marine systems designs to assure that such designs reflect appropriate consideration of IM and R methods and unit costs, resulting in designs with reduced life cycle costs; to include technical information concerning OTEC IM and R possibilities to NOAA/DOE; to outline a basis in which the anticipated IM and R contributions to life cycle costs can be developed for any specific OTEC plant design; to identify IM and R methods within the state-of-the-art in the offshore industry; to determine the application of potential IM and R procedures for the commercial operation of OTEC 10/40 Pilot Plant(s); and input into the US government formulation of statutory and regulatory IM and R requirements for OTEC plants.

  19. Internationally monitored retrievable storage system

    SciTech Connect (OSTI)

    Hafele, W.

    1996-12-31

    The proposed internationally monitored retrievable storage system (IMRSS) is intended to provide an orderly and secure alternative to continuation of the current individualistic spent-fuel management trends in nuclear-power countries. The IMRSS concept, in its broadest terms, proposes that an international entity undertake the management responsibility for spent fuel after its discharge from power plant cooling ponds. The IMRSS envisages international management of a small number of surface (or near-surface) storage facilities distributed globally (in major nuclear countries and elsewhere) and a transportation system between nuclear plants and the storage facilities. The International Atomic Energy Agency (IAEA) would maintain responsibility for adherence to safeguards criteria. The IMRSS operation would be similar to that of an international bank, with each nation maintaining title to its spent fuel and able to withdraw it for peaceful purposes. The system would provide transparency, accountability, and security. The IMRSS would be a step to establishing an inter- national regime for the prudent management of spent fuel and excess civilian plutonium. The IMRSS concept has been studied in three international workshops. Among the major issues that have been addressed are the global distribution of spent fuel if current trends continue, the need for international criteria and management to ensure public health and nonproliferation, the value of spent-fuel retrievability, the future role of a plutonium resource in the fuel cycle, the operating format of a practical IMRSS, and the integration of an IMRSS with existing geopolitical agreements and arrangements.

  20. Waste Stream Generated and Waste Disposal Plans for Molten Salt Reactor Experiment at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Haghighi, M. H.; Szozda, R. M.; Jugan, M. R.

    2002-02-26

    The Molten Salt Reactor Experiment (MSRE) site is located in Tennessee, on the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR), south of the Oak Ridge National Laboratory (ORNL) main plant across Haw Ridge in Melton Valley. The MSRE was run by ORNL to demonstrate the desirable features of the molten-salt concept in a practical reactor that could be operated safely and reliably. It introduced the idea of a homogeneous reactor using fuel salt media and graphite moderation for power and breeder reactors. The MSRE reactor and associated components are located in cells beneath the floor in the high-bay area of Building 7503 (Figure 1). The reactor was operated from June 1965 to December 1969. When the reactor was shut down, fuel salt was drained from the reactor circuit to two drain tanks. A ''clean'' salt was then circulated through the reactor as a decontamination measure and drained to a third drain tank. When operations ceased, the fuel and flush salts were allowed t o cool and solidify in the drain tanks. At shutdown, the MSRE facility complex was placed in a surveillance and maintenance program. As a result of the S&M program, it was discovered in 1994 that gaseous uranium (233U/232U) hexafluoride (UF6) had moved throughout the MSRE process systems. The UF6 was generated when radiolysis of the fluorine salts caused the individual constituents to dissociate to their component atoms, including free fluorine.Some of the free fluorine combined with uranium fluorides (UF4) in the salt to form UF6. UF6 is gaseous at slightly above ambient temperatures; thus, periodic heating of the fuel salts (which was intended to remedy the radiolysis problems) and simple diffusion had allowed the UF6 to move out of the salt and into the process systems of MSRE.

  1. Surface Radiation Budget from ARM Satellite Retrievals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Surface Radiation Budget from ARM Satellite Retrievals P. Minnis, D. P. Kratz, and T. P. ... Hampton, Virginia Introduction Since the Atmospheric Radiation Measurement (ARM) Program ...

  2. ARM - Publications: Science Team Meeting Documents: Retrievals...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    radar (MMCR) and oxygen-A band. The oxygen-A band measurement with photon path length information provides additional constraints on the radar retrieval, resulting more...

  3. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  4. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final

  5. Improvement of Stent Retriever Design and Efficacy of Mechanical Thrombectomy in a Flow Model

    SciTech Connect (OSTI)

    Wenger, Katharina; Nagl, Frank; Wagner, Marlies Berkefeld, Joachim

    2013-02-15

    In vitro experiments were performed to evaluate the efficacy of mechanical intracranial thrombectomy comparing the newly developed Aperio stent retriever and standard devices for stroke treatment. The Aperio (A), with an increased working length of 4 cm and a special cell design for capturing and withholding clots, was compared to three benchmark devices: the Solitaire retrievable stent (B), the Merci X6 (C), and the Merci L5 retriever (D). In a vascular glass model with pulsatile flow, reminiscent of the M1 segment of the middle cerebral artery, we repeatedly induced occlusion by generating thrombi via a modified Chandler loop system. The numbers of recanalization attempts, peripheral embolizations, and recanalizations at the site of occlusion were recorded during 10 retrieval experiments with each device. Eleven devices were able to remove the blood clots from the occluded branch. In 34 of 40 experiments, restoration of flow was obtained in 1-3 attempts. The main differences between the study devices were observed in terms of clot withholding and fragmentation during retrieval. Although there was only one fragmentation recorded for device A, disengagement of the whole clot or peripheral embolization of fragments occurred more frequently (5-7 times) with devices B, C, and D. In a vascular model, the design of device A was best at capturing and withholding thrombi during retrieval. Further study will be necessary to see whether this holds true in clinical applications.

  6. Coplanar Doppler Lidar Retrieval of Rotors from T-REX

    SciTech Connect (OSTI)

    Hill, Michael; Calhoun, Ron; Fernando, H. J. S.; Wieser, Andreas; Dornbrack, Andreas; Weissmann, Martin; Mayr, G.; Newsom, Rob K.

    2010-03-01

    Two coherent Doppler lidars were deployed during the Terrain-induced Rotor EXperiment (T-REX). Coplanar Range Height Indicator (RHI) scans by the lidars (along the same azimuthal angle) allowed retrieval of two-dimensional velocity vectors on a vertical/cross-barrier plane using the least squares method. Vortices are shown to evolve and advect in the flow field, allowing analysis of their behavior in the mountain-wave-boundary layer system. The locations, magnitudes, and evolution of the vortices can be studied through calculated fields of velocity, vorticity, streamlines, and swirl. Two classes of vortical motions are identified: rotors and sub-rotors, which differ in scale and behavior. The level of coordination of the two lidars and the nature of the output (i.e., in range-gates) creates inherent restrictions on the spatial and temporal resolution of retrieved fields.

  7. Estimating Missing Features to Improve Multimedia Information Retrieval

    SciTech Connect (OSTI)

    Bagherjeiran, A; Love, N S; Kamath, C

    2006-09-28

    Retrieval in a multimedia database usually involves combining information from different modalities of data, such as text and images. However, all modalities of the data may not be available to form the query. The retrieval results from such a partial query are often less than satisfactory. In this paper, we present an approach to complete a partial query by estimating the missing features in the query. Our experiments with a database of images and their associated captions show that, with an initial text-only query, our completion method has similar performance to a full query with both image and text features. In addition, when we use relevance feedback, our approach outperforms the results obtained using a full query.

  8. Project Specific Quality Assurance Plan (QAPP)

    SciTech Connect (OSTI)

    Huston, J.J.

    1994-11-01

    The Project QAPP`s describe the program and the planned actions which WHC will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C. The Project involves retrieving the high-heat waste from Tank 241-C-106 to close the safety issue associate with the tank, demonstrate initial waste retrieval technology for a Single Shell Tank, and provide feed for the Hanford Waste Vitrification Plant.

  9. Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk

    SciTech Connect (OSTI)

    Hall, C.E.

    1998-01-09

    Before RL can authorize proceeding with Phase 1B, the PHMC team must demonstrate its readiness to retrieve and deliver the waste to the private contractors and to receive and dispose of the products and byproducts returned from the treatment. The PHMC team has organized their plans for providing these vitrification-support services into the Retrieval and Disposal Mission within the Tank Waste Remediation System (TWRS) Program.

  10. Development and application of new methods to retrieve vertical...

    Office of Scientific and Technical Information (OSTI)

    information, so developments of remote sensing methods for retrievals of parameters in precipitating cloud condition was essential. Providing modelers with retrieval results ...

  11. Development and application of new methods to retrieve vertical...

    Office of Scientific and Technical Information (OSTI)

    methods for retrievals of parameters in precipitating cloud condition was essential. Providing modelers with retrieval results was also one of the key objectives of this research ...

  12. Aerosol Retrievals from ARM SGP MFRSR Data (Dataset) | Data Explorer

    Office of Scientific and Technical Information (OSTI)

    Aerosol Retrievals from ARM SGP MFRSR Data Title: Aerosol Retrievals from ARM SGP MFRSR Data The Multi-Filter Rotating Shadowband Radiometer (MFRSR) makes precise simultaneous ...

  13. ARM Cloud Retrieval Ensemble Data Set (ACRED) (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    The techniques used for the nine cloud retrievals are briefly described in this document. This document also outlines the ACRED data availability, variables, and the nine retrieval ...

  14. ARM: Microwave Radiometer Retrievals (MWRRET) of Cloud Liquid...

    Office of Scientific and Technical Information (OSTI)

    Microwave Radiometer Retrievals (MWRRET) of Cloud Liquid Water and Precipitable Water Vapor Title: ARM: Microwave Radiometer Retrievals (MWRRET) of Cloud Liquid Water and ...

  15. Hanford Tank Waste Retrieval, Treatment and Disposition Framework...

    Office of Environmental Management (EM)

    Hanford Tank Waste Retrieval, Treatment and Disposition Framework Hanford Tank Waste Retrieval, Treatment and Disposition Framework Completing the Office of River Protection (ORP) ...

  16. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office...

  17. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  18. ARM - Publications: Science Team Meeting Documents: Retrieval...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Retrieval of optical thickness of low-level water cloud using the MSG multi-channel data Inoue, Toshiro MRIJMA We studied the optical thickness of low-level water cloud using MSG...

  19. Environmental impacts of proposed Monitored Retrievable Storage

    SciTech Connect (OSTI)

    Scharber, Wayne K.; Macintire, H. A.; Davis, Paul E.; Cothron, Terry K.; Stephens, Barry K.; Travis, Norman; Walter, George; Mobley, Mike

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  20. Technical requirements specification for tank waste retrieval

    SciTech Connect (OSTI)

    Lamberd, D.L.

    1996-09-26

    This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

  1. SU-E-T-213: Initial Experience with VMAT Plan and Delivery Verification Using a DICOM-RT Framework and Linac Delivery Log Files

    SciTech Connect (OSTI)

    Reynolds, R; Pompos, A; Gu, X; Jiang, S; Stojadinovic, S

    2014-06-01

    Purpose: Mobius3D/MobiusFX (M3D/MFX), a commercial DICOM-RT based plan and delivery verification system, was used to compare calculated and delivered volumetric modulated arc therapy (VMAT) dose distributions using TrueBeam delivery log files (TrajectoryLogs). Methods: M3D/MFX utilizes measured linac commissioning data to generate institution specific beam models for evaluating planned and delivered dose distributions. 30 RapidArc prostate plans and 30 head and neck SmartArc plans were used in this study. For every plan, CT images, contoured structure sets, RT-plan, and RT-dose files were exported to M3D, which recalculated the patients’ planning CT dose distributions using a collapsed-cone-convolutionsuperposition algorithm. MFX utilized the acquired TrajectoryLogs to compute patients’ delivered dose distributions based on actual treatment delivery parameters. The agreement between computed and delivered dose distributions was evaluated utilizing a (3%, 3mm) global 3D-gamma analysis and dose-volume histogram changes for targets and organs at risk. Results: Excellent 3D-gamma agreements were observed for all VMAT plans. On average, for computed and delivered RapidArc and SmartArc plans the gamma passing rates were (99.0%±1.4%) and (96.8%±1.8%), respectively. The average difference for primary target prescription dose percent-coverage between calculated and delivered plans was (− 0.09%±2.52%) for RapidArc and (−2.71%±4.62%) for SmartArc cases. Similarly, the planning target mean dose differences were (1.38%±0.96%) for RapidArc and (1.17%±0.72%) for SmartArc plans. For the prostate plans, the calculated and delivered variations of the maximum dose for a 2cc volume for bladder and rectum were (1.32%±1.26%) and (0.65%±1.44%), respectively. The spinal-cord 2cc maximum dose differences of (3.26%±1.68%) were observed for the SmartArc plans. Conclusions: Clinical quality assurance practice based on linac treatment log files for verification of delivered 3D

  2. Zenith Radiance Retrieval of Cloud Properties

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    retrievals of cloud properties from the AMF/COPS campaign Preliminary retrievals of cloud properties from the AMF/COPS campaign Christine Chiu, UMBC/JCET Alexander Marshak, GSFC Yuri Knyazikhin, Boston University Warren Wiscombe, GSFC Christine Chiu, UMBC/JCET Alexander Marshak, GSFC Yuri Knyazikhin, Boston University Warren Wiscombe, GSFC The cloud optical properties of interest are: The cloud optical properties of interest are: * Cloud optical depth τ - the great unknown * Radiative cloud

  3. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  4. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ

    2008-07-10

    management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its

  5. DOE Integrated Safeguards and Security (DISS) historical document archival and retrieval analysis, requirements and recommendations

    SciTech Connect (OSTI)

    Guyer, H.B.; McChesney, C.A.

    1994-10-07

    The overall primary Objective of HDAR is to create a repository of historical personnel security documents and provide the functionality needed for archival and retrieval use by other software modules and application users of the DISS/ET system. The software product to be produced from this specification is the Historical Document Archival and Retrieval Subsystem The product will provide the functionality to capture, retrieve and manage documents currently contained in the personnel security folders in DOE Operations Offices vaults at various locations across the United States. The long-term plan for DISS/ET includes the requirement to allow for capture and storage of arbitrary, currently undefined, clearance-related documents that fall outside the scope of the ``cradle-to-grave`` electronic processing provided by DISS/ET. However, this requirement is not within the scope of the requirements specified in this document.

  6. Tank waste remediation system simulation analysis retrieval model

    SciTech Connect (OSTI)

    Fordham, R.A.

    1996-09-30

    The goal of simulation was to test tll(., consequences of assumptions. For the TWRS SIMAN Retrieval Model, l@lie specific assumptions are primarily defined with respect to waste processing arid transfer timing. The model tracks 73 chem1913ical constituents from underground waste tanks to glass; yet, the detailed (@hemistrv and complete set of unit operations of the TWRS process flow sheet are represented only at the level necessary to define the waste processing and transfer logic and to estimate the feed composition for the treatment facilities. Tlierefor(,, the model should net be regarded as a substitute for the TWRS process flow sheet. Pra(!ticallv the model functions as a dyrt(imic extension of the flow sheet model. I I The following sections present the description, assunipt@ions, architecture, arid evalua- tion of the TWRS SIMAN Retrieval Model. Section 2 describes the model in terms of an overview of the processes represented. Section 3 presents the assumptions for the simulation model. Specific assumptions 9.tt(l parameter values used in the model are provided for waste retrieval, pretreatment, low-level waste (LLNN7) immobilization, and high-level waste (HLW) immobilization functions. Section 4 describes the model in terms of its functional architec- rare to d(@fine a basis for a systematic evaluation of the model. Finally, Section 5 documents an independent test and evaluation of the niodel`s performance (i.e., the verification and validation). Additionally, Appendix A gives a complete listing of the tank inventory used. Appendix B documents the verification and validation plan that was used for the (Section 5) evaluation work. A description and listing of all the model variables is given in Appendix C along with a complete source listing.

  7. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  8. AEC Experiment Establishes Computer Link Between California and...

    Office of Scientific and Technical Information (OSTI)

    The experiment was conducted using a special information retrieval language known as RECON, which was developed for NASA at the Lockheed Palo Alto Research Laboratory. The AEC over ...

  9. ARM - SPARTICUS Planning - Data Plots

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurements SGP Data Plots NASA Data Plots ARM Data Discovery Browse Data Experiment Planning SPARTICUS Proposal Abstract Science Questions Science and Operations (PDF, 1.01M)...

  10. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  11. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Vision Plan The Lab offers employees and their eligible dependents free vision coverage through Vision Service Plan (VSP). The plan covers exams, contact lenses, eyeglass lenses and frames. Participants can use any provider but VSP network providers offer the best value and will file the claim

  12. Low-level waste feed staging plan

    SciTech Connect (OSTI)

    Certa, P.J.; Grams, W.H.; McConville, C.M.; L. W. Shelton, L.W.; Slaathaug, E.J., Westinghouse Hanford

    1996-08-12

    The `Preliminary Low-Level Waste Feed Staging Plan` was updated to reflect the latest requirement in the Tank Waste Remediation Privatization Request for Proposals (RFP) and amendments. The updated plan develops the sequence and transfer schedule for retrieval of DST supernate by the management and integration contractor and delivery of the staged supernate to the private low-activity waste contractors for treatment. Two DSTs are allocated as intermediate staging tanks. A transfer system conflict analysis provides part of the basis for determining transfer system upgrade requirements to support both low-activity and high-level waste feed delivery. The intermediate staging tank architecture and retrieval system equipment are provided as a planning basis until design requirements documents are prepared. The actions needed to successfully implement the plan are identified. These include resolution of safety issues and changes to the feed envelope limits, minimum order quantities, and desired batch sizes.

  13. Partnership Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Plan July 2016 July 2016 Page 1 U.S. DRIVE Partnership Plan Table of Contents Foreword ....................................................................................................................................................... 2 Definition ...................................................................................................................................................... 3 Partners

  14. SU-E-I-97: Smart Auto-Planning Framework in An EMR Environment (SAFEE)

    SciTech Connect (OSTI)

    Zhang, B; Chen, S; Mutaf, Y; Prado, K; D'Souza, W

    2014-06-01

    Purpose: Our Radiation Oncology Department uses clinical practice guidelines for patient treatment, including normal tissue sparing and other dosimetric constraints. These practice guidelines were adapted from national guidelines, clinical trials, literature reviews, and practitioner's own experience. Modern treatment planning systems (TPS) have the capability of incorporating these practice guidelines to automatically create radiation therapy treatment plans with little human intervention. We are developing a software infrastructure to integrate clinical practice guidelines and radiation oncology electronic medical record (EMR) system into radiation therapy treatment planning system (TPS) for auto planning. Methods: Our Smart Auto-Planning Framework in an EMR environment (SAFEE) uses a software pipeline framework to integrate practice guidelines,EMR, and TPS together. The SAFEE system starts with retrieving diagnosis information and physician's prescription from the EMR system. After approval of contouring, SAFEE will automatically create plans according to our guidelines. Based on clinical objectives, SAFEE will automatically select treatment delivery techniques (such as, 3DRT/IMRT/VMAT) and optimize plans. When necessary, SAFEE will create multiple treatment plans with different combinations of parameters. SAFEE's pipeline structure makes it very flexible to integrate various techniques, such as, Model-Base Segmentation (MBS) and plan optimization algorithms, e.g., Multi-Criteria Optimization (MCO). In addition, SAFEE uses machine learning, data mining techniques, and an integrated database to create clinical knowledgebase and then answer clinical questions, such as, how to score plan quality or how volume overlap affects physicians' decision in beam and treatment technique selection. Results: In our institution, we use Varian Aria EMR system and RayStation TPS from RaySearch, whose ScriptService API allows control by external programs. These applications are

  15. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  16. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    SciTech Connect (OSTI)

    Boston, H.L.

    1998-01-07

    This memorandum provides a summary of PHMC [Project Hanford Management Contract] team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to-proceed, a summary of the PHMC team readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  17. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    SciTech Connect (OSTI)

    Jordan, K.N.

    1998-01-09

    This memorandum provides a summary of PHMC (Project Hanford Management Contract) team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to proceed, a summary of the PHMC readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  18. Waste Emplacement/Retrieval System Description Document

    SciTech Connect (OSTI)

    Eric Loros

    2001-07-25

    The Waste Emplacement/Retrieval System transports Waste Packages (WPs) from the Waste Handling Building (WHB) to the subsurface area of emplacement, and emplaces the WPs once there. The Waste Emplacement/Retrieval System also, if necessary, removes some or all of the WPs from the underground and transports them to the surface. Lastly, the system is designed to remediate abnormal events involving the portions of the system supporting emplacement or retrieval. During emplacement operations, the system operates on the surface between the WHB and North Portal, and in the subsurface in the North Ramp, access mains, and emplacement drifts. During retrieval or abnormal conditions, the operations areas may also extend to a surface retrieval storage site and South Portal on the surface, and the South Ramp in the subsurface. A typical transport and emplacement operation involves the following sequence of events. A WP is loaded into a WP transporter at the WHB, and coupled to a pair of transport locomotives. The locomotives transport the WP from the WHB, down the North Ramp, and to the entrance of an emplacement drift. Once docked at the entrance of the emplacement drift, the WP is moved outside of the WP transporter, and engaged by a WP emplacement gantry. The WP emplacement gantry lifts the WP, and transports it to its emplacement location, where the WP is then lowered to its final resting position. The WP emplacement gantry remains in the drift while the WP transporter is returned to the WHB by the locomotives. When the transporter reaches the WHB, the sequence of operations is repeated. Retrieval of all the WPs, or a large group of WPs, under normal conditions is achieved by reversing the emplacement operations. Retrieval of a small set of WPs, under normal or abnormal conditions, is known as recovery. Recovery performed under abnormal conditions will involve a suite of specialized equipment designed to perform a variety of tasks to enable the recovery process. Recovery

  19. ARM - PI Product - In-Situ Data for Microphysical Retrievals: TC4, 2007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ProductsIn-Situ Data for Microphysical Retrievals: TC4, 2007 Citation DOI: 10.5439/1244832 [ What is this? ] ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : In-Situ Data for Microphysical Retrievals: TC4, 2007 [ ARM research ] This data set is derived from measurements collected in situ by the NASA DC8 during the Tropical Cloud Climate Composition Coupling Experiment (TC4) that was conducted during July

  20. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  1. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  2. Using an Innovative Technique to Retrieve Oil in Lawrence County...

    Energy Savers [EERE]

    Using an Innovative Technique to Retrieve Oil in Lawrence County, Illinois Using an Innovative Technique to Retrieve Oil in Lawrence County, Illinois April 25, 2012 - 5:07pm ...

  3. Hanford Tank Farm Workers Begin Tank Waste Retrieval Ahead of...

    Office of Environmental Management (EM)

    Tank Farm Workers Begin Tank Waste Retrieval Ahead of Schedule Hanford Tank Farm Workers Begin Tank Waste Retrieval Ahead of Schedule March 16, 2016 - 12:35pm Addthis Workers ...

  4. Guideline For Retrieving Customer Usage Data From Utilities

    Broader source: Energy.gov [DOE]

    This webinar, held on Dec. 16, 2010, provides information for utilities interested in retrieving data on customer usage.

  5. Creation of the dam for the No. 2 Kambaratinskaya HPP by large-scale blasting: analysis of planning experience and lessons learned

    SciTech Connect (OSTI)

    Shuifer, M. I.; Argal, E. S.

    2012-05-15

    Results of complex instrument observations and video taping during large-scale blasts detonated for creation of the dam at the No. 2 Kambaratinskaya HPP on the Naryn River in the Kyrgyz Republic are analyzed. Tests of the energy effectiveness of the explosives are evaluated, characteristics of LSB manifestations in seismic and air waves are revealed, and the shaping and movement of the rock mass are examined. A methodological analysis of the planning and production of the LSB is given.

  6. Retrieval Of Final Stored Radioactive Waste Resumes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits » Retirement Retirement Retirement Plans Your appointment type determines your eligibility for retirement coverage similar to the eligibility requirements for enrollment in the insurance programs. If your appointment confers eligibility you will automatically be enroll in the applicable retirement plan which is determined by your date of hire. Your servicing HR office is responsible for determining the applicable retirement plan for you. There are various retirement plans and types the

  7. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    SciTech Connect (OSTI)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  8. Waste Emplacement/Retrieval System Description Document

    SciTech Connect (OSTI)

    2000-10-12

    The Waste Emplacement/Retrieval System transports Waste Packages (WPs) from the Waste Handling Building (WHB) to the subsurface area of emplacement, and emplaces the WPs once there. The system also, if necessary, removes some or all of the WPs from the underground and transports them to the surface. Lastly, the system is designed to remediate abnormal events involving the portions of the system supporting emplacement or retrieval. During emplacement operations, the system operates on the surface between the WHB and North Portal, and in the subsurface in the North Ramp, access mains, and emplacement drifts. During retrieval or abnormal conditions, the operations areas may also extend to a surface retrieval storage site and South Portal on the surface, and the South Ramp in the subsurface. A typical transport and emplacement operation involves the following sequence of events. A WP is loaded into a WP transporter at the WHB, and coupled to a pair of transport locomotives. The locomotives transport the WP from the WHB, down the North Ramp, and to the entrance of an emplacement drift. Once docked at the entrance of the emplacment drift, the WP is moved outside of the WP transporter, and engaged by a WP emplacement gantry. The gantry lifts the WP, and transports it to its emplacement location, where the WP is then lowered to its final resting position. The gantry remains in the drift while the WP transporter is returned to the WHB by the locomotives. When the transporter reaches the WHB, the sequence of operations is repeated. Retrieval of all the WPs, or a large group of WPs, under normal conditions is achieved by reversing the emplacement operations. Retrieval of a small set of WPs, under normal or abnormal conditions, is known as recovery. Recovery performed under abnormal conditions will involve a suite of specialized equipment designed to perform a variety of tasks to enable the recovery process. Recovery after abnormal events may require clearing of equipment

  9. Aerosol Retrievals from ARM SGP MFRSR Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Alexandrov, Mikhail

    2008-01-15

    The Multi-Filter Rotating Shadowband Radiometer (MFRSR) makes precise simultaneous measurements of the solar direct normal and diffuse horizontal irradiances at six wavelengths (nominally 415, 500, 615, 673, 870, and 940 nm) at short intervals (20 sec for ARM instruments) throughout the day. Time series of spectral optical depth are derived from these measurements. Besides water vapor at 940 nm, the other gaseous absorbers within the MFRSR channels are NO2 (at 415, 500, and 615 nm) and ozone (at 500, 615, and 670 nm). Aerosols and Rayleigh scattering contribute atmospheric extinction in all MFRSR channels. Our recently updated MFRSR data analysis algorithm allows us to partition the spectral aerosol optical depth into fine and coarse modes and to retrieve the fine mode effective radius. In this approach we rely on climatological amounts of NO2 from SCIAMACHY satellite retrievals and use daily ozone columns from TOMS.

  10. CD DVD Retrieval | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CD DVD Retrieval Publications KMD Contacts Project Summaries EPAct 2005 Arctic Energy Office Announcements Software Stripper Wells The user can download the complete CD/DVD via zip files, or if applicable use the interactive webpages to review the content online. Users can also request mailed copies of the media using the NETL CD-DVD ordering system. CD Image Title: Naturally Fracture Reservoir Simulator: FRACGEN & NFFLOW Info: The DOE sponsored a project to simulate the behavior of tight,

  11. Bin Set 1 Calcine Retrieval Feasibility Study

    SciTech Connect (OSTI)

    R. D. Adams; S. M. Berry; K. J. Galloway; T. A. Langenwalter; D. A. Lopez; C. M. Noakes; H. K. Peterson; M. I. Pope; R. J. Turk

    1999-10-01

    At the Department of Energy's Idaho Nuclear Technology and Engineering Center, as an interim waste management measure, both mixed high-level liquid waste and sodium bearing waste have been solidified by a calculation process and are stored in the Calcine Solids Storage Facilities. This calcined product will eventually be treated to allow final disposal in a national geologic repository. The Calcine Solids Storage Facilities comprise seven ''bit sets.'' Bin Set 1, the first to be constructed, was completed in 1959, and has been in service since 1963. It is the only bin set that does not meet current safe-shutdown earthquake seismic criteria. In addition, it is the only bin set that lacks built-in features to aid in calcine retrieval. One option to alleviate the seismic compliance issue is to transport the calcine from Bin Set 1 to another bin set which has the required capacity and which is seismically qualified. This report studies the feasibility of retrieving the calcine from Bi n Set 1 and transporting it into Bin Set 6 which is located approximately 650 feet away. Because Bin Set 1 was not designed for calcine retrieval, and because of the high radiation levels and potential contamination spread from the calcined material, this is a challenging engineering task. This report presents preconceptual design studies for remotely-operated, low-density, pneumatic vacuum retrieval and transport systems and equipment that are based on past work performed by the Raytheon Engineers and Constructors architectural engineering firm. The designs presented are considered feasible; however, future development work will be needed in several areas during the subsequent conceptual design phase.

  12. Microsoft Word - HABAdv #233_System Plan Rev4_Planning Rev5.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Subject: Tank Waste System Plan Rev 4 & Planning for Rev 5 Adopted: June 4, 2010 Page 1 June 4, 2010 Shirley Olinger, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: Tank Waste System Plan Revision 4 and Planning Assumptions for Revision 5 Dear Ms. Olinger and Ms. Hedges, Background Safe tank waste retrieval, treatment

  13. Engineering development of waste retrieval end effectors for the Oak Ridge gunite waste tanks

    SciTech Connect (OSTI)

    Mullen, O.D.

    1997-05-01

    The Gunite and Associated Tanks Treatability Study at Oak Ridge National Laboratory selected the waterjet scarifying end effector, the jet pump conveyance system, and the Modified Light Duty Utility Arm and Houdini Remotely Operated Vehicle deployment and manipulator systems for evaluation. The waterjet-based retrieval end effector had been developed through several generations of test articles targeted at deployment in Hanford underground storage tanks with a large robotic arm. The basic technology had demonstrated effectiveness at retrieval of simulants bounding the foreseen range of waste properties and indicated compatibility with the planned deployment systems. The Retrieval Process Development and Enhancements team was tasked with developing a version of the retrieval end effector tailored to the Oak Ridge tanks, waste and deployment platforms. The finished prototype was delivered to PNNL and subjected to a brief round of characterization and performance testing at the Hydraulic Testbed prior to shipment to Oak Ridge. It has undergone extensive operational testing in the Oak Ridge National Laboratory Tanks Technology Cold Test Facility and performed well, as expected. A second unit has been delivered outfitted with the high pressure manifold.

  14. Using ARM Data to Evaluate Satellite Surface Solar Flux Retrievals

    SciTech Connect (OSTI)

    Hinkelman, L.M.; Stackhouse, P.W.; Young, D.F.; Long, C.N.; Rutan, D.

    2005-03-18

    The accurate, long-term radiometric data collected by Atmospheric Radiation Measurement (ARM) has become essential to the evaluation of surface radiation budget data from satellites. Since the spatial and temporal characteristics of data from these two sources are very different, the comparisons are typically made for long-term average values. While such studies provide a general indication of the quality of satellite flux products, more detailed analysis is required to understand specific retrieval algorithm weaknesses. Here we show how data from the ARM shortwave flux analysis (SFA) value added product (VAP) are being used to assess solar fluxes in the Global Energy and Water Cycle Experiment (GEWEX) Surface Radiation Budget (SRB), release 2.5.

  15. Tank waste remediation system retrieval and disposal mission key enabling assumptions

    SciTech Connect (OSTI)

    Baldwin, J.H.

    1998-01-09

    An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed. An analysis of the programmatic, management and technical activities necessary to declare Readiness to Proceed with execution of the mission demonstrates that the system, people, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2002. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed, transfer piping routes were mapped on it, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define work scope in greater detail, cost estimates and associated year by year financial analyses were completed. Personnel training, qualifications, management systems and procedures were reviewed and shown to be in place and ready to support the Phase 1B mission. Key assumptions and risks that could negatively impact mission success were evaluated and appropriate mitigative actions plans were planned and scheduled.

  16. Retrieval of Urban Boundary Layer Structures from Doppler Lidar Data. Part I: Accuracy Assessment

    SciTech Connect (OSTI)

    Xia, Quanxin; Lin, Ching Long; Calhoun, Ron; Newsom, Rob K.

    2008-01-01

    Two coherent Doppler lidars from the US Army Research Laboratory (ARL) and Arizona State University (ASU) were deployed in the Joint Urban 2003 atmospheric dispersion field experiment (JU2003) held in Oklahoma City. The dual lidar data are used to evaluate the accuracy of the four-dimensional variational data assimilation (4DVAR) method and identify the coherent flow structures in the urban boundary layer. The objectives of the study are three-fold. The first objective is to examine the effect of eddy viscosity models on the quality of retrieved velocity data. The second objective is to determine the fidelity of single-lidar 4DVAR and evaluate the difference between single- and dual-lidar retrievals. The third objective is to correlate the retrieved flow structures with the ground building data. It is found that the approach of treating eddy viscosity as part of control variables yields better results than the approach of prescribing viscosity. The ARL single-lidar 4DVAR is able to retrieve radial velocity fields with an accuracy of 98% in the along-beam direction and 80-90% in the cross-beam direction. For the dual-lidar 4DVAR, the accuracy of retrieved radial velocity in the ARL cross-beam direction improves to 90-94%. By using the dual-lidar retrieved data as a reference, the single-lidar 4DVAR is able to recover fluctuating velocity fields with 70-80% accuracy in the along-beam direction and 60-70% accuracy in the cross-beam direction. Large-scale convective roll structures are found in the vicinity of downtown airpark and parks. Vortical structures are identified near the business district. Strong updrafts and downdrafts are also found above a cluster of restaurants.

  17. Radioactive waste shipments to Hanford retrievable storage from Babcock and Wilcox, Leechburg, Pennsylvania

    SciTech Connect (OSTI)

    Duncan, D.R.

    1994-02-14

    This report characterizes, as far as possible, the solid radioactive wastes generated by Babcock and Wilcox`s Park Township Plutonium Facility near Leechburg, Pennsylvania that were sent to retrievable storage at the Hanford Site. Solid waste as defined in this document is any containerized or self-contained material that has been declared waste. The objective is a description of characteristics of solid wastes that are or will be managed by the Restoration and Upgrades Program; gaseous or liquid effluents are discussed only at a summary level This characterization is of particular interest in the planning of transuranic (TRU) waste retrieval operations, including the Waste Receiving and Processing (WRAP) Facility, because Babcock and Wilcox generated greater than 2.5 percent of the total volume of TRU waste currently stored at the Hanford Site.

  18. Tank waste remediation system retrieval and disposal mission phase 1 financial analysis

    SciTech Connect (OSTI)

    Wells, M.W.

    1998-01-09

    The purpose of the Tank Waste Remediation System (TWRS) Retrieval and Disposal Mission Phase 1 Financial Analysis is to provide a quantitative and qualitative cost and schedule risk analysis of HNF-1946, Tank Waste Remediation System Retrieval and Disposal Mission Initial Updated Baseline (Swita et al. 1998). The Updated Baseline (Section 3.0) is compared to the current TWRS Project Multi-Year Work Plan (MYWP) for fiscal year (FY) 1998 and target budgets for FY 1999 through FY 2011 (Section 4.1). The analysis then evaluates the executability of HNF-1946 (Sections 4.2 through 4.5) and recommends a path forward for risk mitigation (Sections 4.6, 4.7, and 5.0). A sound systems engineering approach was applied to understand and analyze the Phase 1B Retrieval and Disposal mission. Program and Level 1 Logics were decomposed to Level 8 of the Work Breakdown Structure (WBS) where logic was detailed, scope was defined, detail durations and estimates prepared, and resource loaded schedules developed. Technical Basis Review (TBR) packages were prepared which include this information and, in addition, defined the enabling assumptions for each task, and the risks associated with performance. This process is discussed in Section 2.1. Detailed reviews at the subactivity within the Level 1 Logic TBR levels were conducted to provide the recommended solution to the Phase 1B Retrieval and Disposal Mission. Independent cost analysis and risk assessments were performed by members of the Lockheed Martin Hanford Corporation (LMHC) Business Management and Chief Financial Officer organization along with specialists in risk analysis from TRW, Inc. and Lockheed Martin Energy Systems. The process evaluated technical, schedule, and cost risk by category (program specific fixed and variable, integrated program, and programmatic) based on risk certainly from high probability well defined to very low probability that is not bounded or priceable as discussed in Section 2.2. The results have been

  19. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  20. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 ACTION PLAN 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this action plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and the Washington State Hazardous Waste Management Act. All actions required to be taken pursuant to this Agreement shall be taken in accordance

  1. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Environmental Management (EM)

    ... ideas, consider safe solutions to problems, and use the collective experience ... hazmat security plans; and emergency response planning as required in 49 CFR 173. There ...

  2. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  3. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  4. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 05.18.16 *Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Advice [X] 2. Critical Infrastructure Updates *RAP/HSEP/TWC Advice [X] 3. PFP Progress *RAP/HSEP Agency briefing X 4. Sludge retrieval RAP Agency briefing X 5. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [X] 6. Risk-based retrieval,

  5. Optics Supply Planning System

    SciTech Connect (OSTI)

    Gaylord, J

    2009-04-30

    at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

  6. Subsea well with retrievable piping deck

    SciTech Connect (OSTI)

    Pokladnik, R.L.; Valka, W.A.

    1984-03-27

    An apparatus and method for drilling and completing a subsea well located at the seabed using a retrievable piping deck. The apparatus includes a template supported on the seabed, the retrievable piping deck supported on the template, a plurality of wellheads supported on the template and a plurality of Christmas trees supported on the wellheads. The piping deck has preinstalled flow lines and hydraulic lines to conduct well fluid from the Christmas trees to the surface and to conduct hydraulic control fluid from the surface to the trees. In addition to the Christmas trees, a well fluid manifold and a gaseous-liquid component separator can be supported on the template. The fluid connections between the Christmas trees and the hydraulic and flow lines and between the manifold and separator and the hydraulic and flow lines are accomplished by vertically oriented stab-in connectors. After installation of the template and drilling of the wells, the piping deck is lowered independently to the template and coupled thereto and then the Christmas trees and manifold-separator are lowered to the template and into fluid communication with the piping deck hydraulic and flow lines.

  7. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain

    2012-07-01

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear

  8. Posters Radar/Radiometer Retrievals of Cloud Liquid Water and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for retrieving cloud liquid water content and drizzle characteristics using a K -band Doppler radar (Kropfli et al. 1990) and microwave radiometer (Hogg et al. 1983). The...

  9. Using ARM data to correct plane-parallel satellite retrievals...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Using ARM data to correct plane-parallel satellite retrievals of cloud properties Dong, Xiquan University of North Dakota Minnis, Patrick NASA Langley Research Center Xi, Baike...

  10. Detecting Cirrus-Overlapping-Water Clouds and Retrieving their...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clouds and Retrieving their Optical Properties Using MODIS Data F.-L. Chang and Z. Li Earth System Science Interdisciplinary Center University of Maryland College...

  11. Modification and Application of a New Method for Retrieving Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of a New Method for Retrieving Water-Cloud Microphysics Vertical Profile F.-L Chang and Z. Li Earth System Science Interdisciplinary Center University of Maryland College...

  12. Retrieval Of Final Stored Radioactive Waste Resumes | Department...

    Office of Environmental Management (EM)

    Among the extensive engineered controls that have been put in place to protect workers is the Retrieval Containment Enclosure wall that isolates the remaining waste from the rest ...

  13. MBL Drizzle Properties and Their Impact on Cloud Property Retrieval

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    layer drizzle properties and their impact on cloud property retrieval." Atmospheric Measurement Techniques, 8, doi:10.5194amt-8-3555-2015. Contributors Xiquan Dong,...

  14. Validation of TES Temperature and Water Vapor Retrievals with...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The primary objective of the TES (Tropospheric Emission Spectrometer) instrument on the Aura spacecraft is the retrieval of trace gases, especially water vapor and ozone. The TES...

  15. Retrieval and Repackaging of RH-TRU Waste - General Presentation...

    Office of Environmental Management (EM)

    Retrieval and Repackaging of RH-TRU Waste- GENERAL PRESENTATION MODULAR HOT CELL TECHNOLOGY AREVA FEDERAL SERVICES - OAK RIDGE, TN - GENERAL PRESENTATION OF MODULAR HOT CELL ...

  16. ARM - Publications: Science Team Meeting Documents: AIRS retrievals...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AIRS retrievals of atmospheric profiles of temperature and humidity - comparisons with radiosondes and ship-based remote sensing during AEROSE Minnett, Peter University of Miami...

  17. Engineer/constructor description of work for Tank 241-SY-102 retrieval system, project W-211, initial tank retrieval systems

    SciTech Connect (OSTI)

    Rieck, C.A.

    1996-02-01

    This document provides a description of work for the design and construction of a waste retrieval system for Tank 241-SY-102. The description of work includes a working estimate and schedule, as well as a narrative description and sketches of the waste retrieval system. The working estimate and schedule are within the established baselines for the Tank 241-SY-102 retrieval system. The technical baseline is provided in Functional Design Criteria, WHC-SD-W211-FDC-001, Revision 2.

  18. Techniques for Intravascular Foreign Body Retrieval

    SciTech Connect (OSTI)

    Woodhouse, Joe B.; Uberoi, Raman

    2013-08-01

    As endovascular therapies increase in frequency, the incidence of lost or embolized foreign bodies is increasing. The presence of an intravascular foreign body (IFB) is well recognized to have the potential to cause serious complications. IFB can embolize and impact critical sites such as the heart, with subsequent significant morbidity or mortality. Intravascular foreign bodies most commonly result from embolized central line fragments, but they can originate from many sources, both iatrogenic and noniatrogenic. The percutaneous approach in removing an IFB is widely perceived as the best way to retrieve endovascular foreign bodies. This minimally invasive approach has a high success rate with a low associated morbidity, and it avoids the complications related to open surgical approaches. We examined the characteristics, causes, and incidence of endovascular embolizations and reviewed the various described techniques that have been used to facilitate subsequent explantation of such materials.

  19. EMSL Contribution Plan

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-12-01

    This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2

  20. Storage and retrieval of large digital images

    DOE Patents [OSTI]

    Bradley, Jonathan N.

    1998-01-01

    Image compression and viewing are implemented with (1) a method for performing DWT-based compression on a large digital image with a computer system possessing a two-level system of memory and (2) a method for selectively viewing areas of the image from its compressed representation at multiple resolutions and, if desired, in a client-server environment. The compression of a large digital image I(x,y) is accomplished by first defining a plurality of discrete tile image data subsets T.sub.ij (x,y) that, upon superposition, form the complete set of image data I(x,y). A seamless wavelet-based compression process is effected on I(x,y) that is comprised of successively inputting the tiles T.sub.ij (x,y) in a selected sequence to a DWT routine, and storing the resulting DWT coefficients in a first primary memory. These coefficients are periodically compressed and transferred to a secondary memory to maintain sufficient memory in the primary memory for data processing. The sequence of DWT operations on the tiles T.sub.ij (x,y) effectively calculates a seamless DWT of I(x,y). Data retrieval consists of specifying a resolution and a region of I(x,y) for display. The subset of stored DWT coefficients corresponding to each requested scene is determined and then decompressed for input to an inverse DWT, the output of which forms the image display. The repeated process whereby image views are specified may take the form an interaction with a computer pointing device on an image display from a previous retrieval.

  1. Storage and retrieval of large digital images

    DOE Patents [OSTI]

    Bradley, J.N.

    1998-01-20

    Image compression and viewing are implemented with (1) a method for performing DWT-based compression on a large digital image with a computer system possessing a two-level system of memory and (2) a method for selectively viewing areas of the image from its compressed representation at multiple resolutions and, if desired, in a client-server environment. The compression of a large digital image I(x,y) is accomplished by first defining a plurality of discrete tile image data subsets T{sub ij}(x,y) that, upon superposition, form the complete set of image data I(x,y). A seamless wavelet-based compression process is effected on I(x,y) that is comprised of successively inputting the tiles T{sub ij}(x,y) in a selected sequence to a DWT routine, and storing the resulting DWT coefficients in a first primary memory. These coefficients are periodically compressed and transferred to a secondary memory to maintain sufficient memory in the primary memory for data processing. The sequence of DWT operations on the tiles T{sub ij}(x,y) effectively calculates a seamless DWT of I(x,y). Data retrieval consists of specifying a resolution and a region of I(x,y) for display. The subset of stored DWT coefficients corresponding to each requested scene is determined and then decompressed for input to an inverse DWT, the output of which forms the image display. The repeated process whereby image views are specified may take the form an interaction with a computer pointing device on an image display from a previous retrieval. 6 figs.

  2. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through The Hartford. These income protection plans will pay a percentage of your salary when you are unable to work due to illness or injury. Resources STD highlight sheet ...

  3. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of financial resources and the latest financial tools to make saving for retirement easy. ... This plan allows you to save and invest a piece of your paycheck before taxes are taken ...

  4. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  5. Secure Retrieval of FFTF Testing, Design, and Operating Information

    SciTech Connect (OSTI)

    Butner, R. Scott; Wootan, David W.; Omberg, Ronald P.; Makenas, Bruce J.; Nielsen, Deborah

    2009-10-01

    . Accomplishments include secure retrieval of: more than 400 boxes of FFTF information, several hundred microfilm reels including Clinch River Breeder Reactor (CRBR) information, and 40 boxes of information on the Fuels and Materials Examination Facility (FMEF). All information preserved to date is now being stored and categorized consistent with the IAEA international standardized taxonomy. Earlier information largely related to irradiation testing is likewise being categorized. The fuel test results information exists in several different formats depending upon the final stage of the test evaluation. In some cases there is information from both non-destructive and destructive examination while in other cases only non-destructive results are available. Non-destructive information would include disassembly records, dimensional profilometry, gamma spectrometry, and neutron radiography. Information from destructive examinations would include fission gas analysis, metallography, and photomicrographs. Archiving of FFTF data, including both the reactor plant and the fuel test information, is being performed in coordination with other data archiving efforts underway under the aegis of the AFCI program. In addition to the FFTF efforts, archiving of data from the EBR-II reactor is being carried out by INL. All material at risk associated with FFTF documentation has been secured in a timely manner consistent with the stated plan. This documentation is now being categorized consistent with internationally agreed upon IAEA standards. Documents are being converted to electronic format for transfer to a large searchable electronic database being developed by INL. In addition, selected FFTF information is being used to generate test cases for large-scale simulation modeling efforts and for providing Design Data Need (DDN) packages as requested by the AFCI program.

  6. Integration of Biodiversity into National Forestry Planning:...

    Open Energy Info (EERE)

    Biodiversity into National Forestry Planning: An Annotated Bibliography of Web-Based Resources, Methods, Experiences, and Case Studies Jump to: navigation, search Tool Summary...

  7. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  8. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    SciTech Connect (OSTI)

    BURKE CA; LANDON MR; HANSON CE

    2012-01-30

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  9. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    SciTech Connect (OSTI)

    BURKE CA; LANDON MR; HANSON CE

    2011-11-08

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are beinglhave been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  10. Development and Deployment of the Mobile Arm Retrieval System (MARS) - 12187

    SciTech Connect (OSTI)

    Burke, Christopher A.; Landon, Matthew R.; Hanson, Carl E.

    2012-07-01

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012. (authors)

  11. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 Work Plan Working draft - reflects comments received from PIC, HSEP, TWC and RAP committees (updated October 22, 2015) 1 Hanford Advisory Board Draft Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area

  12. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  13. High performance gamma measurements of equipment retrieved from Hanford high-level nuclear waste tanks

    SciTech Connect (OSTI)

    Troyer, G.L.

    1997-03-17

    The cleanup of high level defense nuclear waste at the Hanford site presents several progressive challenges. Among these is the removal and disposal of various components from buried active waste tanks to allow new equipment insertion or hazards mitigation. A unique automated retrieval system at the tank provides for retrieval, high pressure washing, inventory measurement, and containment for disposal. Key to the inventory measurement is a three detector HPGe high performance gamma spectroscopy system capable of recovering data at up to 90% saturation (200,000 counts per second). Data recovery is based on a unique embedded electronic pulser and specialized software to report the inventory. Each of the detectors have different shielding specified through Monte Carlo simulation with the MCNP program. This shielding provides performance over a dynamic range of eight orders of magnitude. System description, calibration issues and operational experiences are discussed.

  14. Information retrieval system: impacts of water-level changes on uses of federal storage reservoirs of the Columbia River.

    SciTech Connect (OSTI)

    Fickeisen, D.H.; Cowley, P.J.; Neitzel, D.A.; Simmons, M.A.

    1982-09-01

    A project undertaken to provide the Bonneville Power Administration (BPA) with information needed to conduct environmental assessments and meet requirements of the National Environmental Policy Act (NEPA) and the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act) is described. Access to information on environmental effects would help BPA fulfill its responsibilities to coordinate power generation on the Columbia River system, protect uses of the river system (e.g., irrigation, recreation, navigation), and enhance fish and wildlife production. Staff members at BPA identified the need to compile and index information resources that would help answer environmental impact questions. A computer retrieval system that would provide ready access to the information was envisioned. This project was supported by BPA to provide an initial step toward a compilation of environmental impact information. Scientists at Pacific Northwest Laboratory (PNL) identified, gathered, and evaluated information related to environmental effects of water level on uses of five study reservoirs and developed and implemented and environmental data retrieval system, which provides for automated storage and retrieval of annotated citations to published and unpublished information. The data retrieval system is operating on BPA's computer facility and includes the reservoir water-level environmental data. This project was divided into several tasks, some of which were conducted simultaneously to meet project deadlines. The tasks were to identify uses of the five study reservoirs, compile and evaluate reservoir information, develop a data entry and retrieval system, identify and analyze research needs, and document the data retrieval system and train users. Additional details of the project are described in several appendixes.

  15. AMIE (ACRF MJO Investigation Experiment)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AMIE (ACRF MJO Investigation Experiment) Planning Meeting AMIE Science Steering Committee Chuck Long, Tony DelGenio, Bill Gustafson, Bob Houze, Mike Jensen, Steve Klein, Ruby...

  16. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  17. Mixer pump test plan for double shell tank AZ-101

    SciTech Connect (OSTI)

    STAEHR, T.W.

    1999-05-12

    Mixer pump systems have been chosen as the method for retrieval of tank wastes contained in double shell tanks at Hanford. This document describes the plan for testing and demonstrating the ability of two 300 hp mixer pumps to mobilize waste in tank AZ-101. The mixer pumps, equipment and instrumentation to monitor the test were installed by Project W-151.

  18. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  19. Tank waste remediation system retrieval and disposal mission key enabling assumptions

    SciTech Connect (OSTI)

    Baldwin, J.H.

    1998-01-05

    An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. The review showed that since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farm structure and configurations and work scope and costs has been established itself as part of the culture within TWRS. An analysis of the programmatic, management and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, people and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2OO2. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed. Transfer piping routes were mapped out, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define work scope in greater detail, cost estimates and associated year by year financial analyses were completed. TWRS personnel training, qualifications, management systems and procedures were reviewed and shown to be in place and ready to support the Phase 1B mission. Key assumptions and risks that could negatively impact mission success were evaluated and appropriate mitigative actions plans were planned and scheduled.

  20. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  1. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  2. ARM - PI Product - Cloud Property Retrieval Products for Graciosa Island,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Azores ProductsCloud Property Retrieval Products for Graciosa Island, Azores ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Cloud Property Retrieval Products for Graciosa Island, Azores [ research data - ASR funded ] The motivation for developing this product was to use the Dong et al. 1998 method to retrieve cloud microphysical properties, such as cloud droplet effective radius, cloud droplets

  3. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    SciTech Connect (OSTI)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  4. Project management plan for project W-320, tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  5. Plan Your Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visit Plan your visit to the museum Experience 40 interactive exhibits revealing nuclear defense history and the research in life sciences, material sciences, space, supercomputing, energy and the environment. August 18, 2014 Visitor in an interactive exhibit Contact Us thumbnail of Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Bradbury Science Museum, 1350 Central Avenue Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Open every day except Thanksgiving, Christmas, and New

  6. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sectors. BBEE programs are growing in prominence around the country, using a substantial body of knowledge and experience associated with behavior change that is rooted in the...

  7. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  8. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  9. ARM Cloud Retrieval Ensemble Data Set (ACRED) (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: ARM Cloud Retrieval Ensemble Data Set (ACRED) ... This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and ...

  10. Joint retrievals of cloud and drizzle in marine boundary layer...

    Office of Scientific and Technical Information (OSTI)

    Specifically, the vertical structure of droplet size and water content of both cloud and ... cumulus under stratocumulus, where cloud water path is retrieved with an error of 31 g ...

  11. Innovative Idaho Site Crews Find Ways to Make Waste Retrieval...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    crews safely remove the final box from Pad 1, Cell 2 located in the Transuranic Storage Area Retrieval Enclosure. On the left, the original box was degraded and could not be ...

  12. ARM - Evaluation Product - MWR Retrievals of Cloud Liquid Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ProductsMWR Retrievals of Cloud Liquid Water and Water Vapor ARM Data Discovery Browse Data Documentation Use the Data File Inventory tool to view data availability at the file...

  13. Retrieval/ex situ thermal treatment scoring interaction report

    SciTech Connect (OSTI)

    Raivo, B.D.; Richardson, J.G.

    1993-11-01

    A retrieval/ex situ thermal treatment technology process for the Idaho National Engineering Laboratory transuranic waste pits and trenches is present. A system performance score is calculated, and assumptions, requirements, and reference baseline technologies for all subelements are included.

  14. EM's Office of River Protection Completes Waste Retrieval in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retrieval activities began in April 2014 using an enhanced-reach sluicer, a tool lowered into the underground tank that sprays liquid, mainly recycled waste, through a nozzle at ...

  15. Slurry Retrieval, Pipeline Transport & Plugging and Mixing Workshop

    Office of Environmental Management (EM)

    Gary L. Smith - Office of Waste Processing (EM-21) Slurry Retrieval, Pipeline Transport & Plugging and Mixing Workshop 1 Dr. Gary L. Smith - Office of Waste Processing (EM-21) Dr. ...

  16. Environmental impacts of proposed Monitored Retrievable Storage. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  17. Cloud Property Retrieval Products for Graciosa Island, Azores...

    Office of Scientific and Technical Information (OSTI)

    We had been using this method to retrieve cloud microphysical properties over ARM SGP and NSA sites. We also modified the method for the AMF at Shouxian, China and some IOPs, e.g. ...

  18. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  19. TWP-ICE Operations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Plan Peter May, Jim Mather, Christian Jakob, Jay Mace, Greg McFarquhar With contributions from many people Overview The TWPICE experiment will take place from January 21, 2006 through February 13, 2006. During this period, there will be a substantial ground and sea based component as well as NASA, ARM, ARA and UK aircraft. The UK aircraft will also be participating in an experiment in Darwin during November- December 2005. This earlier experiment also involves aircraft associated with

  20. Consistent satellite XCO2 retrievals from SCIAMACHY and GOSAT using the BESD algorithm

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Heymann, J.; Reuter, M.; Hilker, M.; Buchwitz, M.; Schneising, O.; Bovensmann, H.; Burrows, J. P.; Kuze, A.; Suto, H.; Deutscher, N. M.; et al

    2015-02-13

    due to a still non-perfect BESD retrieval algorithm, which will be continuously improved in the future. Our overarching goal is to generate a satellite-derived XCO2 data set appropriate for climate and carbon cycle research covering the longest possible time period. We therefore also plan to extend the existing SCIAMACHY and GOSAT data set discussed here by using also data from other missions (e.g., OCO-2, GOSAT-2, CarbonSat) in the future.« less

  1. Hanford Tank Waste Retrieval, Treatment, and Disposition Framework |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hanford Tank Waste Retrieval, Treatment, and Disposition Framework Hanford Tank Waste Retrieval, Treatment, and Disposition Framework Forty years of plutonium production at the Hanford Site has yielded a challenging nuclear waste legacy approximately 56 million gallons of radioactive and chemical wastes stored in 177 underground tanks (tank farms) located on Hanford's Central Plateau. The mission of the U.S. Department of Energy (DOE) Office of River Protection (ORP) is

  2. Laboratory issues statement on Los Alamos historical document retrieval and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assessment report Historical document retrieval and assessment report Laboratory issues statement on Los Alamos Historical Document Retrieval and Assessment report This is an important document, and we take it seriously. June 25, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  3. An Evaluation of MWR Retrievals of Liquid Water Path

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evaluation of MWR Retrievals of Liquid Water Path and Precipitable Water Vapor R. T. Marchand and T. P. Ackerman Pacific Northwest National Laboratory Richland, Washington Introduction This paper offers some observations on the quality of Microwave Radiometer (MWR) retrievals of precipitable water vapor (PWV) and liquid water path (LWP). The paper shows case study comparisons between the standard "statistical" approach and those obtained using an iterative solution of the microwave

  4. SNF fuel retrieval sub project safety analysis document

    SciTech Connect (OSTI)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  5. Visualizing and improving the robustness of phase retrieval algorithms

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Tripathi, Ashish; Leyffer, Sven; Munson, Todd; Wild, Stefan M.

    2015-06-01

    Coherent x-ray diffractive imaging is a novel imaging technique that utilizes phase retrieval and nonlinear optimization methods to image matter at nanometer scales. We explore how the convergence properties of a popular phase retrieval algorithm, Fienup's HIO, behave by introducing a reduced dimensionality problem allowing us to visualize and quantify convergence to local minima and the globally optimal solution. We then introduce generalizations of HIO that improve upon the original algorithm's ability to converge to the globally optimal solution.

  6. Cloud Property Retrieval Products for Graciosa Island, Azores

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Dong, Xiquan

    The motivation for developing this product was to use the Dong et al. 1998 method to retrieve cloud microphysical properties, such as cloud droplet effective radius, cloud droplets number concentration, and optical thickness. These retrieved properties have been used to validate the satellite retrieval, and evaluate the climate simulations and reanalyses. We had been using this method to retrieve cloud microphysical properties over ARM SGP and NSA sites. We also modified the method for the AMF at Shouxian, China and some IOPs, e.g. ARM IOP at SGP in March, 2000. The ARSCL data from ARM data archive over the SGP and NSA have been used to determine the cloud boundary and cloud phase. For these ARM permanent sites, the ARSCL data was developed based on MMCR measurements, however, there were no data available at the Azores field campaign. We followed the steps to generate this derived product and also include the MPLCMASK cloud retrievals to determine the most accurate cloud boundaries, including the thin cirrus clouds that WACR may under-detect. We use these as input to retrieve the cloud microphysical properties. Due to the different temporal resolutions of the derived cloud boundary heights product and the cloud properties product, we submit them as two separate netcdf files.

  7. Cloud Property Retrieval Products for Graciosa Island, Azores

    SciTech Connect (OSTI)

    Dong, Xiquan

    2014-05-05

    The motivation for developing this product was to use the Dong et al. 1998 method to retrieve cloud microphysical properties, such as cloud droplet effective radius, cloud droplets number concentration, and optical thickness. These retrieved properties have been used to validate the satellite retrieval, and evaluate the climate simulations and reanalyses. We had been using this method to retrieve cloud microphysical properties over ARM SGP and NSA sites. We also modified the method for the AMF at Shouxian, China and some IOPs, e.g. ARM IOP at SGP in March, 2000. The ARSCL data from ARM data archive over the SGP and NSA have been used to determine the cloud boundary and cloud phase. For these ARM permanent sites, the ARSCL data was developed based on MMCR measurements, however, there were no data available at the Azores field campaign. We followed the steps to generate this derived product and also include the MPLCMASK cloud retrievals to determine the most accurate cloud boundaries, including the thin cirrus clouds that WACR may under-detect. We use these as input to retrieve the cloud microphysical properties. Due to the different temporal resolutions of the derived cloud boundary heights product and the cloud properties product, we submit them as two separate netcdf files.

  8. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide. In his

  9. Note: Phase retrieval method for analyzing single-phase displacement interferometry data

    SciTech Connect (OSTI)

    Chen, X. H.; Zeng, X. L.; Fan, D.; Liu, Q. C.; Bie, B. X.; Zhou, X. M. Luo, S. N.

    2014-02-15

    We present a phase retrieval method (PRM) for analyzing single-phase displacement interferometry measurements on rapidly changing velocity histories, including photon Doppler velocimetry (PDV). PRM identifies the peaks and valleys as well as zero-crossing points in a PDV time series, performs normalization and extracts point-by-point phase and thus velocity information. PRM does not require a wide time window as in sliding window Fourier transformation, and thus improves the effective temporal resolution. This method is implemented in analyzing PDV data obtained from gas gun experiments, and validated against simultaneous measurements with velocity interferometer system for any reflector.

  10. Tank waste remediation system engineering plan

    SciTech Connect (OSTI)

    Rifaey, S.H.

    1998-01-09

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

  11. ARM: Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Maria Cadeddu

    Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

  12. ARM: Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Maria Cadeddu

    2004-02-19

    Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

  13. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 24, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Informational x x 2. 100 D/H Proposed Plan RAP Informational x x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. 324 Waste Sites RAP Informational 5. 618-10 VPU remediation RAP Informational 6. Central Plateau Inner Area Guidelines RAP Informational x 7. ERDF RAP

  14. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adopted by the Hanford Advisory Board on 11/5/2015, updated 12/21/15 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview and RAP Issue Manager Assignments) Topic Committee Assignment Issue Managers (lead noted in bold) Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Mattson, Suyama x 2. 100 D/H Proposed Plan RAP Engstrom, Mattson, Garnant, Leckband x 3. 100-N Proposed Plan RAP Cimon, Mattson x 4. Central Plateau Inner Area Guidelines RAP Cimon, Catrell,

  15. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2015June 18, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  16. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated December 21, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  17. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    SciTech Connect (OSTI)

    KIRKBRIDE, R.A.

    2000-04-19

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

  18. Tank Waste Retrieval Lessons Learned at the Hanford Site

    SciTech Connect (OSTI)

    Dodd, R.A.

    2008-07-01

    One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA

  19. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  20. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  1. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  2. DOE CONTRACTOR PENSION PLANS

    Broader source: Energy.gov (indexed) [DOE]

    ... plan(s) to maximize the contribution predictability (i.e. forecasting accuracy) and contain current and future costs, to include rationale for selection of all plan assumptions ...

  3. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  4. Innovative Idaho Site Crews Find Ways to Make Waste Retrieval Safer, More

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficient | Department of Energy Innovative Idaho Site Crews Find Ways to Make Waste Retrieval Safer, More Efficient Innovative Idaho Site Crews Find Ways to Make Waste Retrieval Safer, More Efficient June 30, 2015 - 12:00pm Addthis Advanced Mixed Waste Treatment Project retrieval crews safely remove the final box from Pad 1, Cell 2 located in the Transuranic Storage Area Retrieval Enclosure. On the left, the original box was degraded and could not be retrieved intact, so crews removed its

  5. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    SciTech Connect (OSTI)

    Berglin, E.J.

    1998-02-05

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  6. TANK FARM RETRIEVAL LESSONS LEARNED AT THE HANFORD SITE

    SciTech Connect (OSTI)

    DODD RA

    2008-01-22

    One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST saltcake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the TriParty Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U. S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 fe in 530,000 gallon or larger tanks; 30 fe in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an

  7. SLUDGE RETRIEVAL FROM HANFORD K WEST BASIN SETTLER TANKS

    SciTech Connect (OSTI)

    ERPENBECK EG; LESHIKAR GA

    2011-01-13

    In 2010, an innovative, remotely operated retrieval system was deployed to successfully retrieve over 99.7% of the radioactive sludge from ten submerged tanks in Hanford's K-West Basin. As part of K-West Basin cleanup, the accumulated sludge needed to be removed from the 0.5 meter diameter by 5 meter long settler tanks and transferred approximately 45 meters to an underwater container for sampling and waste treatment. The abrasive, dense, non-homogeneous sludge was the product of the washing process of corroded nuclear fuel. It consists of small (less than 600 micron) particles of uranium metal, uranium oxide, and various other constituents, potentially agglomerated or cohesive after 10 years of storage. The Settler Tank Retrieval System (STRS) was developed to access, mobilize and pump out the sludge from each tank using a standardized process of retrieval head insertion, periodic high pressure water spray, retraction, and continuous pumping of the sludge. Blind operations were guided by monitoring flow rate, radiation levels in the sludge stream, and solids concentration. The technology developed and employed in the STRS can potentially be adapted to similar problematic waste tanks or pipes that must be remotely accessed to achieve mobilization and retrieval of the sludge within.

  8. Memorandum of understanding for the TWRS characterization retrieval project

    SciTech Connect (OSTI)

    JO, J.

    1999-02-24

    During fiscal year 1999, various programs and projects will require analyses from the 222-S Laboratory. In order to prioritize and successfully meet the analytical demands of all the customers, multiple organizations across the Tank Waste Remediation System (TWRS) must work together. One of the projects that will require analyses from the 222-S Laboratory is the retrieval project. Successful completion of retrieval project objectives requires cooperation among four TWRS organizations. The requirements and expectations regarding retrieval project analytical work were examined in order to define roles and responsibilities for each of these TWRS organizations. This memorandum of understanding (MOU) documents the results of this review and establishes the roles and responsibilities. This MOU is subdivided into three sections, the first of which is this introduction. Section 2 provides a summary of the overall roles and responsibilities with respect to retrieval project analytical work for the four TWRS organizations involved. The final section describes the individual interfaces involved in performing retrieval project analytical work, and discusses the roles and responsibilities with respect to each individual interface.

  9. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings

    SciTech Connect (OSTI)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 2 provides the complete set of the Detail Design drawings along with a listing of the drawings. Once approved by WHC, these drawings will be issued and baselined for the Title 3 construction effort.

  10. Advanced Waste Retrieval System. Innovative Technology Summary Report

    SciTech Connect (OSTI)

    2001-09-01

    At West Valley, following the baseline removal operations, bulk waste retrieval methods may be augmented if required, with the deployment of the Advanced Waste Retrieval System (AWRS). The AWRS is a hydraulic boom mounted on a trolley on the Mast-Mounted Tool Delivery System. The boom is about 15 ft long with a pan and tilt mechanism at the end. On the end is a steam jet with a suction tool that can reach down around the tank internal structure and vacuum up zeolite or sludge off the bottom of the tank from a thirty-foot diameter reach. A grinder is included topside in the discharge path to pulverize the zeolite so it can be readily retrieved from the destination tank.

  11. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  12. Retrieving moisture profiles from precipitable water measurements using a variational data assimilation approach

    SciTech Connect (OSTI)

    Guo, Y.R.; Zou, X.; Kuo, Y.H.

    1996-04-01

    Atmospheric moisture distribution is directly related to the formation of clouds and precipitation and affects the atmospheric radiation and climate. Currently, several remote sensing systems can measure precipitable water (PW) with fairly high accuracy. As part of the development of an Integrated Data Assimilation and Sounding System in support of the Atmospheric Radiation Measurement Program, retrieving the 3-D water vapor fields from PW measurements is an important problem. A new four dimensional variational (4DVAR) data assimilation system based on the Penn State/National Center for Atmospheric Research (NCAR) mesoscale model (MM5) has been developed by Zou et al. (1995) with the adjoint technique. In this study, we used this 4DVAR system to retrieve the moisture profiles. Because we do not have a set of real observed PW measurements now, the special soundings collected during the Severe Environmental Storm and Mesoscale Experiment (SESAME) in 1979 were used to simulate a set of PW measurements, which were then assimilated into the 4DVAR system. The accuracy of the derived water vapor fields was assessed by direct comparison with the detailed specific humidity soundings. The impact of PW assimilation on precipitation forecast was examined by conducting a series of model forecast experiments started from the different initial conditions with or without data assimilation.

  13. ARM - PI Product - AERIoe Thermodynamic Profile and Cloud Retrieval for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MC3E Garber X-band site (I5) Garber X-band site (I5) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : AERIoe Thermodynamic Profile and Cloud Retrieval for MC3E Garber X-band site (I5) [ ARM research ] The AERIoe algorithm retrieves profiles of temperature and water vapor mixing ratio, together with cloud properties for a single-layer cloud (i.e., LWP, effective radius), from AERI-observed infrared

  14. ARM - PI Product - AERIoe Thermodynamic Profile and Cloud Retrieval for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MC3E Lamont X-band site (I6) Lamont X-band site (I6) ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : AERIoe Thermodynamic Profile and Cloud Retrieval for MC3E Lamont X-band site (I6) [ ARM research ] The AERIoe algorithm retrieves profiles of temperature and water vapor mixing ratio, together with cloud properties for a single-layer cloud (i.e., LWP, effective radius), from AERI-observed infrared

  15. ARM - PI Product - Aerosol Retrievals from ARM SGP MFRSR Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ProductsAerosol Retrievals from ARM SGP MFRSR Data ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Aerosol Retrievals from ARM SGP MFRSR Data The Multi-Filter Rotating Shadowband Radiometer (MFRSR) makes precise simultaneous measurements of the solar direct normal and diffuse horizontal irradiances at six wavelengths (nominally 415, 500, 615, 673, 870, and 940 nm) at short intervals (20 sec for ARM

  16. Evaluating cloud retrieval algorithms with the ARM BBHRP framework

    SciTech Connect (OSTI)

    Mlawer,E.; Dunn,M.; Mlawer, E.; Shippert, T.; Troyan, D.; Johnson, K. L.; Miller, M. A.; Delamere, J.; Turner, D. D.; Jensen, M. P.; Flynn, C.; Shupe, M.; Comstock, J.; Long, C. N.; Clough, S. T.; Sivaraman, C.; Khaiyer, M.; Xie, S.; Rutan, D.; Minnis, P.

    2008-03-10

    Climate and weather prediction models require accurate calculations of vertical profiles of radiative heating. Although heating rate calculations cannot be directly validated due to the lack of corresponding observations, surface and top-of-atmosphere measurements can indirectly establish the quality of computed heating rates through validation of the calculated irradiances at the atmospheric boundaries. The ARM Broadband Heating Rate Profile (BBHRP) project, a collaboration of all the working groups in the program, was designed with these heating rate validations as a key objective. Given the large dependence of radiative heating rates on cloud properties, a critical component of BBHRP radiative closure analyses has been the evaluation of cloud microphysical retrieval algorithms. This evaluation is an important step in establishing the necessary confidence in the continuous profiles of computed radiative heating rates produced by BBHRP at the ARM Climate Research Facility (ACRF) sites that are needed for modeling studies. This poster details the continued effort to evaluate cloud property retrieval algorithms within the BBHRP framework, a key focus of the project this year. A requirement for the computation of accurate heating rate profiles is a robust cloud microphysical product that captures the occurrence, height, and phase of clouds above each ACRF site. Various approaches to retrieve the microphysical properties of liquid, ice, and mixed-phase clouds have been processed in BBHRP for the ACRF Southern Great Plains (SGP) and the North Slope of Alaska (NSA) sites. These retrieval methods span a range of assumptions concerning the parameterization of cloud location, particle density, size, shape, and involve different measurement sources. We will present the radiative closure results from several different retrieval approaches for the SGP site, including those from Microbase, the current 'reference' retrieval approach in BBHRP. At the NSA, mixed-phase clouds and

  17. Maintenance study for W-340 Waste Retrieval System

    SciTech Connect (OSTI)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System.

  18. DOE Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Plans DOE Plans DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration Strategic Plan (PDF) DOE Chief Information Officer Strategic Plan Chicago Strategic Plan (PDF)

  19. CRAD, Criticality Safety- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Criticality Safety program at the Idaho Accelerated Retrieval Project Phase II.

  20. CRAD, Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Management at the Idaho Accelerated Retrieval Project Phase II.

  1. TECHNOLOGY SUMMARY ADVANCING TANK WASTE RETRIEVAL AND PROCESSING

    SciTech Connect (OSTI)

    SAMS TL; MENDOZA RE

    2010-08-11

    This technology overview provides a high-level summary of technologies being investigated and developed by Washington River Protection Solutions (WRPS) to advance Hanford Site tank waste retrieval and processing. Technology solutions are outlined, along with processes and priorities for selecting and developing them.

  2. Status report on SIRS: sorption information retrieval system

    SciTech Connect (OSTI)

    Hostetler, D.D.; Serne, R.J.; Baldwin, A.J.; Petrie, G.M.

    1980-11-01

    Two major uses were identified for the Sorption Information Retrieval System: (1) to aid geochemists in the elucidation of sorption mechanisms; and (2) to aid safety assessment modelers in selection of Kds for any given scenerio. Other benefits such as providing an auditable vehicle for the Kd selection were also discussed.

  3. Hanford Site Shares Lessons Learned in Retrieving Highly Radioactive Material

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (Richland) and its contractor, CH2M HILL Plateau Remediation Company (CH2M HILL), welcomed staff from the Oak Ridge Office of Environmental Management Transuranic (TRU) waste processing team in Tennessee to the Hanford site recently to share lessons learned in the retrieval and processing of highly radioactive material, called sludge.

  4. CRAD, Occupational Safety & Health- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Occupational Safety and Industrial Hygiene Program at the Idaho Accelerated Retrieval Project Phase II.

  5. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  6. CRAD, Fire Protection- Idaho Accelerated Retrieval Project Phase II

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Fire Protection program at the Idaho Accelerated Retrieval Project Phase II.

  7. CRAD, Engineering- Idaho Accelerated Retrieval Project Phase II

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Engineering program at the Idaho Accelerated Retrieval Project Phase II.

  8. CRAD, Safety Basis- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Safety Basis at the Idaho Accelerated Retrieval Project Phase II.

  9. CRAD, Quality Assurance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Quality Assurance Program at the Idaho Accelerated Retrieval Project Phase II.

  10. CRAD, Emergency Management- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Emergency Management program at the Idaho Accelerated Retrieval Project Phase II.

  11. CRAD, Training- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Training Program at the Idaho Accelerated Retrieval Project Phase II.

  12. CRAD, Conduct of Operations- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February, 2006 Commencement of Operations assessment of the Conduct of Operations program at the Idaho Accelerated Retrieval Project Phase II.

  13. CRAD, Radiological Controls- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Radiation Protection Program at the Idaho Accelerated Retrieval Project Phase II.

  14. Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Presentation Agenda * Strategic Energy Planning - Strategic Energy Planning (SEP) Workbook - What is it? - The process - The plan * Activity 2 1/28/2016 2 Strategic Energy Plan and Planning Handbook * Provides a step-by-step process that Tribes may wish to use as a road map for discussion and decisions related to strategic energy planning and energy project prioritization * Includes blank text boxes for communities to input their own information and outcomes from energy

  15. GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN

    SciTech Connect (OSTI)

    CANTRELL KJ; CONNELLY MP

    2010-03-09

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  16. Technical WOrk Plan for: Construction Effects Monitoring

    SciTech Connect (OSTI)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  17. Pandemic Influenza Pediatric Office Plan Template

    SciTech Connect (OSTI)

    HCTT CHE

    2010-01-01

    This is a planning tool developed by pediatric stakeholders that is intended to assist pediatric medical offices that have no pandemic influenza plan in place, but may experience an increase in patient calls/visits or workload due to pandemic influenza.

  18. 2014 National Clean Energy Business Plan Competition

    Broader source: Energy.gov [DOE]

    Now in its third year, the National Clean Energy Business Plan Competition is helping energy entrepreneurs get the funding and experience they need to expand operations and advance their technology.

  19. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  20. Phase retrieval with the transport-of-intensity equation in an arbitrarily-shaped aperture by iterative discrete cosine transforms

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Huang, Lei; Zuo, Chao; Idir, Mourad; Qu, Weijuan; Asundi, Anand

    2015-04-21

    A novel transport-of-intensity equation (TIE) based phase retrieval method is proposed with putting an arbitrarily-shaped aperture into the optical wavefield. In this arbitrarily-shaped aperture, the TIE can be solved under non-uniform illuminations and even non-homogeneous boundary conditions by iterative discrete cosine transforms with a phase compensation mechanism. Simulation with arbitrary phase, arbitrary aperture shape, and non-uniform intensity distribution verifies the effective compensation and high accuracy of the proposed method. Experiment is also carried out to check the feasibility of the proposed method in real measurement. Comparing to the existing methods, the proposed method is applicable for any types of phasemore » distribution under non-uniform illumination and non-homogeneous boundary conditions within an arbitrarily-shaped aperture, which enables the technique of TIE with hard aperture become a more flexible phase retrieval tool in practical measurements.« less

  1. Third Buried Waste Retrieval Project under way at DOE Idaho Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Third Buried Waste Retrieval Project under way at DOE Idaho Site The Idaho Cleanup Project has recently begun removing Cold War weapons waste from a third retrieval area at the ...

  2. Retrieval of Hanford Single Shell Nuclear Waste Tanks using Technologies Foreign and Domestic

    SciTech Connect (OSTI)

    EACKER, J.A.; GIBBONS, P.W.

    2003-01-01

    The Hanford Site is accelerating its SST retrieval mission. One aspect of this acceleration is the identification of new baseline retrieval technologies that can be applied to all tank conditions for salt & sludge wastes in both sound & leaking tanks.

  3. Tanks Focus Area retrieval process development and enhancements FY96 technology development summary report

    SciTech Connect (OSTI)

    Rinker, M.W.; Bamberger, J.A.; Hatchell, B.K.

    1996-09-01

    The Retrieval Process Development and Enhancements (RPD&E) activities are part of the Retrieval and Closure Program of the U.S. Department of Energy (DOE) EM-50 Tanks Focus Area. The purposes of RPD&E are to understand retrieval processes, including emerging and existing technologies, and to gather data on those processes, so that end users have the requisite technical basis to make retrieval decisions. Work has been initiated to support the need for multiple retrieval technologies across the DOE complex. Technologies addressed during FY96 focused on enhancements to sluicing, borehole mining, confined sluicing retrieval end effectors, the lightweight scarifier, and pulsed air mixing. Furthermore, a decision tool and database have been initiated to link retrieval processes with tank closure to assist end users in making retrieval decisions.

  4. DOE/SC-ARM-TR-099 ARM Cloud Retrieval Ensemble Data Set

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    99 ARM Cloud Retrieval Ensemble Data Set (ACRED) C Zhao MP Jensen S Xie GG Mace SA Klein ... DOESC-ARM-TR-099 ARM Cloud Retrieval Ensemble Data Set (ACRED) C Zhao, Lawrence Livermore ...

  5. Development of NEXRAD Wind Retrievals as Input to Atmospheric Dispersion Models

    SciTech Connect (OSTI)

    Fast, Jerome D.; Newsom, Rob K.; Allwine, K Jerry; Xu, Qin; Zhang, Pengfei; Copeland, Jeffrey H.; Sun, Jenny

    2007-03-06

    The objective of this study is to determine the feasibility that routinely collected data from the Doppler radars can appropriately be used in Atmospheric Dispersion Models (ADMs) for emergency response. We have evaluated the computational efficiency and accuracy of two variational mathematical techniques that derive the u- and v-components of the wind from radial velocities obtained from Doppler radars. A review of the scientific literature indicated that the techniques employ significantly different approaches in applying the variational techniques: 2-D Variational (2DVar), developed by NOAAs (National Oceanic and Atmospheric Administration's) National Severe Storms Laboratory (NSSL) and Variational Doppler Radar Analysis System (VDRAS), developed by the National Center for Atmospheric Research (NCAR). We designed a series of numerical experiments in which both models employed the same horizontal domain and resolution encompassing Oklahoma City for a two-week period during the summer of 2003 so that the computed wind retrievals could be fairly compared. Both models ran faster than real-time on a typical single dual-processor computer, indicating that they could be used to generate wind retrievals in near real-time. 2DVar executed ~2.5 times faster than VDRAS because of its simpler approach.

  6. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 8/31/2016 * Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Agency briefing, advice [x] 2. Sludge retrieval RAP Agency briefing x x 3. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [x] 4. River Corridor updates RAP Agency briefing 5. Groundwater updates RAP Agency briefing x x x x 6. Central

  7. Tax-Advantaged Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tax-Advantaged Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow....

  8. VULCAN celebrates completion and develops future plans (Journal...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 70 PLASMA PHYSICS AND FUSION TECHNOLOGY; VULCAN FACILITY; TECHNOLOGY ASSESSMENT; EXPERIMENT PLANNING Word Cloud ...

  9. River Protection Project (RPP) Tank Waste Retrieval and Disposal Mission Technical Baseline Summary Description

    SciTech Connect (OSTI)

    DOVALLE, O.R.

    1999-12-29

    This document is one of the several documents prepared by Lockheed Martin Hanford Corp. to support the U. S. Department of Energy's Tank Waste Retrieval and Disposal mission at Hanford. The Tank Waste Retrieval and Disposal mission includes the programs necessary to support tank waste retrieval; waste feed, delivery, storage, and disposal of immobilized waste; and closure of the tank farms.

  10. Process Description for the Retrieval of Earth Covered Transuranic (TRU) Waste Containers at the Hanford Site

    SciTech Connect (OSTI)

    DEROSA, D.C.

    2000-01-13

    This document describes process and operational options for retrieval of the contact-handled suspect transuranic waste drums currently stored below grade in earth-covered trenches at the Hanford Site. Retrieval processes and options discussed include excavation, container retrieval, venting, non-destructive assay, criticality avoidance, incidental waste handling, site preparation, equipment, and shipping.

  11. Consistent satellite XCO2 retrievals from SCIAMACHY and GOSAT using the BESD algorithm

    SciTech Connect (OSTI)

    Heymann, J.; Reuter, M.; Hilker, M.; Buchwitz, M.; Schneising, O.; Bovensmann, H.; Burrows, J. P.; Kuze, A.; Suto, H.; Deutscher, N. M.; Dubey, M. K.; Griffith, D. W. T.; Hase, F.; Kawakami, S.; Kivi, R.; Morino, I.; Petri, C.; Roehl, C.; Schneider, M.; Sherlock, V.; Sussmann, R.; Velazco, V. A.; Warneke, T.; Wunch, D.

    2015-02-13

    -perfect collocation (2 h, 10 10 around TCCON sites), i.e., the observed air masses are not exactly identical, but likely also due to a still non-perfect BESD retrieval algorithm, which will be continuously improved in the future. Our overarching goal is to generate a satellite-derived XCO2 data set appropriate for climate and carbon cycle research covering the longest possible time period. We therefore also plan to extend the existing SCIAMACHY and GOSAT data set discussed here by using also data from other missions (e.g., OCO-2, GOSAT-2, CarbonSat) in the future.

  12. ENERGY Workforce Restructuring Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENERGY Workforce Restructuring Plan for the Idaho Operations Office March 2016 WORKFORCE RESTRUCTURING PLAN For the Idaho Operations Office Table of Contents I. INTRODUCTION...................................................................................................................................................... 1 Executive Summary ................................................................................................................................................ 1

  13. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Storm Water Documents Individual Permit NPDES No. NM0030759 (pdf) Storm Water Plans Site Discharge Pollution Prevention Plan (SDPPP) Volume 1 - Los AlamosPueblo...

  14. Microsoft Word - 2015_0914_FY2016HABWorkPlan_v1.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board Fiscal Year 2016 Work Plan Updated October 22, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6.

  15. Recommendations on the proposed Monitored Retrievable Storage Facility

    SciTech Connect (OSTI)

    Not Available

    1985-10-01

    Following the Department of Energy's announcement in April 1985 that three Tennessee sites were to be considered for the Monitored Retrievable Storage facility, Governor Lamar Alexander initiated a review of the proposal to be coordinated by his Safe Growth Team. Roane County and the City of Oak Ridge, the local governments sharing jurisdiction over DOE's primary and secondary sites, were invited to participate in the state's review of the MRS proposal. Many issues related to the proposed MRS are being considered by the Governor's Safe Growth Team. The primary objective of the Clinch River MRS Task Force has been to determine whether the proposed Monitored Retrievable Storage facility should be accepted by the local governments, and if so, under what conditions. The Clinch River MRS Task Force is organized into an Executive Committee cochaired by the Roane County Executive and Mayor of Oak Ridge and three Study Groups focusing on environmental (including health and safety), socioeconomic, and transportation issues.

  16. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    SciTech Connect (OSTI)

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  17. Radiosonde observations at Pt. Reyes and cloud properties retrieved from

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GOES-WEST Radiosonde observations at Pt. Reyes and cloud properties retrieved from GOES-WEST Inoue, Toshiro MRI/JMA Category: Field Campaigns Low-level cloud formed off the west coast of continents plays an important role in general circulation and climate. Marine Stratus Radiation Aerosol and Drizzle (MASRAD) was conducted at the ARM mobile site deployed at Pt Reyes, California during April to September. Here, we studied the relationship between meteorological parameters observed by GPS

  18. Retrieval of buried depleted uranium from the T-1 trench

    SciTech Connect (OSTI)

    Burmeister, M.; Castaneda, N.; Greengard, T. |; Hull, C.; Barbour, D.; Quapp, W.J.

    1998-07-01

    The Trench 1 remediation project will be conducted this year to retrieve depleted uranium and other associated materials from a trench at Rocky Flats Environmental Technology Site. The excavated materials will be segregated and stabilized for shipment. The depleted uranium will be treated at an offsite facility which utilizes a novel approach for waste minimization and disposal through utilization of a combination of uranium recycling and volume efficient uranium stabilization.

  19. ARM - Publications: Science Team Meeting Documents: Autonomous Retrieval of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cloud and Aerosol Properties from ARM Micropulse Lidar Autonomous Retrieval of Cloud and Aerosol Properties from ARM Micropulse Lidar Flynn, Connor Pacific Northwest National Laboratory Christy, Jason Columbia University Beus, Sherman PNNL Micropulse Lidar (MPL) have been a core component of ARM active remote sensing for more than a decade. To date, autonomous value-added products developed from the MPL have focused strictly on determination of cloud base and cloud boundaries. We present

  20. System to control contamination during retrieval of buried TRU waste

    DOE Patents [OSTI]

    Menkhaus, D.E.; Loomis, G.G.; Mullen, C.K.; Scott, D.W.; Feldman, E.M.; Meyer, L.C.

    1993-04-20

    A system is described to control contamination during the retrieval of hazardous waste comprising an outer containment building, an inner containment building, within the outer containment building, an electrostatic radioactive particle recovery unit connected to and in communication with the inner and outer containment buildings, and a contaminate suppression system including a moisture control subsystem, and a rapid monitoring system having the ability to monitor conditions in the inner and outer containment buildings.

  1. System to control contamination during retrieval of buried TRU waste

    DOE Patents [OSTI]

    Menkhaus, Daniel E.; Loomis, Guy G.; Mullen, Carlan K.; Scott, Donald W.; Feldman, Edgar M.; Meyer, Leroy C.

    1993-01-01

    A system to control contamination during the retrieval of hazardous waste comprising an outer containment building, an inner containment building, within the outer containment building, an electrostatic radioactive particle recovery unit connected to and in communication with the inner and outer containment buildings, and a contaminate suppression system including a moisture control subsystem, and a rapid monitoring system having the ability to monitor conditions in the inner and outer containment buildings.

  2. Cloud Retrievals from Landsat-7 During ARESE II

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cloud Retrievals from Landsat-7 During ARESE II L. Oreopoulos, G. Wen, and A. Marshak Joint Center for Earth Systems Technology University of Maryland Baltimore County Baltimore, Maryland R. F. Cahalan National Aeronautics and Space Administration Goddard Space Flight Center Climate and Radiation Branch Greenbelt, Maryland D. Kratz National Aeronautics and Space Administration Langley Research Center Radiation and Aerosols Branch Hampton, Virginia Background on Landsat-7 While for most Landsat

  3. Well casing hanger and packoff running and retrieval tool

    SciTech Connect (OSTI)

    Pollock, J.R.; Valka, W.A.

    1992-04-21

    This patent describes a well tool for running a casing hanger and a packoff into, and retrieving a packoff from, a subsea wellhead. It comprises a tubular body including means to releasably connect a packoff to the body for running the packoff into a subsea wellhead; means to releasably connect a packoff to the body for retrieving the packoff from a subsea wellhead; means to relocate the packoff running means and the packoff retrieving means between their functional and non-functional positions; means to releasably connect a casing hanger to the body for running the hanger into a subsea wellhead; a tubular mandrel surrounded by and rotatable with respect to the body; means surrounding the mandrel for moving the casing hanger connection means into functional position; first anti-rotation means preventing relative rotation between the body and the means for moving the casing hanger connection means; second anti-rotation means for preventing relative rotation between connection means; second anti-rotation means for preventing relative rotation between the body and a casing hanger connected thereto: and means for connecting the mandrel to a pipe string for running the tool into a subsea wellhead.

  4. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  5. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION PLANNING ACQUISITION PLANNING PDF icon ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Policy Flash 2015-13 POLICY FLASH 2014-25 Revision to the...

  6. ACQUISITION PLANNING | Department of Energy

    Energy Savers [EERE]

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  7. Booster Neutrino Experiment - Introduction

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    close The MiniBooNE Experiment next The Oscillating Neutrino The first phase of the Booster Neutrino Experiment (BooNE) at the Fermi National Accelerator Laboratory is a smaller version of the final planned experiment, and has been dubbed "MiniBooNE." The physicists working on MiniBooNE are trying to find out more about the fundamental properties of neutrinos. But, what exactly is a neutrino? To answer that question, we need to look at what's called the Standard Model of particles and

  8. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    SciTech Connect (OSTI)

    Berglin, E.J.

    1997-07-31

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36`` diameter x 6` high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20` diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  9. EM-50 Tanks Focus Area retrieval process development and enhancements. FY97 technology development summary report

    SciTech Connect (OSTI)

    Rinker, M.W.; Bamberger, J.A.; Alberts, D.G.

    1997-09-01

    The Retrieval Process Development and Enhancements (RPD and E) activities are part of the US Department of Energy (DOE) EM-50 Tanks Focus Area, Retrieval and Closure program. The purpose of RPD and E is to understand retrieval processes, including emerging and existing technologies, and to gather data on these processes, so that end users have requisite technical bases to make retrieval decisions. Technologies addressed during FY97 include enhancements to sluicing, the use of pulsed air to assist mixing, mixer pumps, innovative mixing techniques, confined sluicing retrieval end effectors, borehole mining, light weight scarification, and testing of Russian-developed retrieval equipment. Furthermore, the Retrieval Analysis Tool was initiated to link retrieval processes with tank waste farms and tank geometric to assist end users by providing a consolidation of data and technical information that can be easily assessed. The main technical accomplishments are summarized under the following headings: Oak Ridge site-gunite and associated tanks treatability study; pulsed air mixing; Oak Ridge site-Old Hydrofracture Facility; hydraulic testbed relocation; cooling coil cleaning end effector; light weight scarifier; innovative tank mixing; advanced design mixer pump; enhanced sluicing; Russian retrieval equipment testing; retrieval data analysis and correlation; simulant development; and retrieval analysis tool (RAT).

  10. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  11. California Maritime Academy: Business Plan

    Broader source: Energy.gov (indexed) [DOE]

    ... Solving Energy Poverty With Solar Light Bulbs: Nokero Product Review. CleanTechnica. Retrieved January 2, 2014, from http:cleantechnica.com20131016solving- energy-poverty-wit...

  12. Ecology WTP Recovery Plan comments ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOCUMENTS. 9302000 and annually thereafter. M-45-00C COMPLETE RENEGOTIATION OF SECOND PHASE (I.E., 9302006 THROUGH 9302015) SST WASTE RETRIEVAL ACTIVITIES. THESE...

  13. Tribal Strategic Energy Plan and Planning Handbook

    Broader source: Energy.gov [DOE]

    The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

  14. Alaska Strategic Energy Plan and Planning Handbook

    Broader source: Energy.gov [DOE]

    The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

  15. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    SciTech Connect (OSTI)

    1985-09-01

    In April 1985, the Department of Energy (DOE) selected the Clinch River site as its preferred site for the construction and operation of the monitored retrievable storage (MRS) facility (USDOE, 1985). In support of the DOE MRS conceptual design activity, available data describing the site have been gathered and analyzed. A composite geotechnical description of the Clinch River site has been developed and is presented herein. This report presents Clinch River site description data in the following sections: general site description, surface hydrologic characteristics, groundwater characteristics, geologic characteristics, vibratory ground motion, surface faulting, stability of subsurface materials, slope stability, and references. 48 refs., 35 figs., 6 tabs.

  16. Rapid automatic keyword extraction for information retrieval and analysis

    DOE Patents [OSTI]

    Rose, Stuart J; Cowley,; Wendy E; Crow, Vernon L; Cramer, Nicholas O

    2012-03-06

    Methods and systems for rapid automatic keyword extraction for information retrieval and analysis. Embodiments can include parsing words in an individual document by delimiters, stop words, or both in order to identify candidate keywords. Word scores for each word within the candidate keywords are then calculated based on a function of co-occurrence degree, co-occurrence frequency, or both. Based on a function of the word scores for words within the candidate keyword, a keyword score is calculated for each of the candidate keywords. A portion of the candidate keywords are then extracted as keywords based, at least in part, on the candidate keywords having the highest keyword scores.

  17. Secure quantum private information retrieval using phase-encoded queries

    SciTech Connect (OSTI)

    Olejnik, Lukasz

    2011-08-15

    We propose a quantum solution to the classical private information retrieval (PIR) problem, which allows one to query a database in a private manner. The protocol offers privacy thresholds and allows the user to obtain information from a database in a way that offers the potential adversary, in this model the database owner, no possibility of deterministically establishing the query contents. This protocol may also be viewed as a solution to the symmetrically private information retrieval problem in that it can offer database security (inability for a querying user to steal its contents). Compared to classical solutions, the protocol offers substantial improvement in terms of communication complexity. In comparison with the recent quantum private queries [Phys. Rev. Lett. 100, 230502 (2008)] protocol, it is more efficient in terms of communication complexity and the number of rounds, while offering a clear privacy parameter. We discuss the security of the protocol and analyze its strengths and conclude that using this technique makes it challenging to obtain the unconditional (in the information-theoretic sense) privacy degree; nevertheless, in addition to being simple, the protocol still offers a privacy level. The oracle used in the protocol is inspired both by the classical computational PIR solutions as well as the Deutsch-Jozsa oracle.

  18. Drift-scale thermomechanical analysis for the retrievability systems study

    SciTech Connect (OSTI)

    Tsai, F.C.

    1996-04-01

    A numerical method was used to estimate the stability of potential emplacement drifts without considering a ground support system as a part of the Thermal Loading Systems Study for the Yucca Mountain Site Characterization Project. The stability of the drift is evaluated with two variables: the level of thermal loading and the diameter of the emplacement drift. The analyses include the thermomechanical effects generated by the excavation of the drift, subsequently by the thermal loads from heat-emitting waste packages, and finally by the thermal reduction resulting from rapid cooling ventilation required for the waste retrieval if required. The Discontinuous Deformation Analysis (DDA) code was used to analyze the thermomechanical response of the rock mass of multiple blocks separated by joints. The result of this stability analysis is used to discuss the geomechanical considerations for the advanced conceptual design (ACD) with respect to retrievability. In particular, based on the rock mass strength of the host rock described in the current version of the Reference Information Base, the computed thermal stresses, generated by 111 MTU/acre thermal loads in the near field at 100 years after waste emplacement, is beyond the criterion for the rock mass strength used to predict the stability of the rock mass surrounding the emplacement drift.

  19. Recommendations on the proposed Monitored Retrievable Storage Facility

    SciTech Connect (OSTI)

    Not Available

    1985-10-01

    Following the Department of Energy`s announcement in April 1985 that three Tennessee sites were to be considered for the Monitored Retrievable Storage facility, Governor Lamar Alexander initiated a review of the proposal to be coordinated by his Safe Growth Team. Roane County and the City of Oak Ridge, the local governments sharing jurisdiction over DOE`s primary and secondary sites, were invited to participate in the state`s review of the MRS proposal. Many issues related to the proposed MRS are being considered by the Governor`s Safe Growth Team. The primary objective of the Clinch River MRS Task Force has been to determine whether the proposed Monitored Retrievable Storage facility should be accepted by the local governments, and if so, under what conditions. The Clinch River MRS Task Force is organized into an Executive Committee cochaired by the Roane County Executive and Mayor of Oak Ridge and three Study Groups focusing on environmental (including health and safety), socioeconomic, and transportation issues.

  20. Decommissioning Plan RM

    Broader source: Energy.gov [DOE]

    The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

  1. Sample Project Execution Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  2. Climate Change Adaptation Planning

    Broader source: Energy.gov [DOE]

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  3. State Energy Strategic Plans

    Broader source: Energy.gov [DOE]

    Most state energy offices across the country are required to have current and long-term strategic energy management plans in place. These strategic plans help to ensure that state agencies are...

  4. National Ignition Facility Configuration Management Plan

    SciTech Connect (OSTI)

    Cabral, S G; Moore, T L

    2002-10-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  5. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  6. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  7. Biennial Plan Summary

    National Nuclear Security Administration (NNSA)

    ` Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary Report to Congress March 2016 National Nuclear Security Administration United States Department of Energy Washington, DC 20585 Department of Energy/National Nuclear Security Administration | March 2016 Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary | Page i Message from the Administrator This Department of Energy's (DOE) National Nuclear Security Administration (NNSA) Fiscal

  8. OREM Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Oak Ridge Office of Environmental Management's Program Plan discusses the vision, goals, and strategy for 2014-2024.

  9. EERE Strategic Plan Briefing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Strategic Plan Briefing 2 EERE Strategic Plan 3 Strategic Plan Input 4 Strategic Plan Implementation 5 A strong and prosperous America, powered by clean, affordable, and secure energy EERE Vision 6 To create and sustain American leadership in the transition to a global clean energy economy EERE Mission 7 EERE Organizational Principles * Economic Prosperity * Affordability * Reduced Environmental Impact * Energy Security * Consumer Choice 8 EERE Five Core Questions * Impact Is this a

  10. Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extends Community Commitment Plan September 18, 2012 LANS Board of Governors extends Community Commitment Plan The Los Alamos National Security, LLC Board of Governors recently voted to extend its Community Commitment Plan for one year. The plan invests $3 million of the company's management fee each year in regional education, economic development and community giving programs. It is managed by LANL's Community Programs Office and was launched in 2006 when LANS won the prime contract to manage

  11. Management and Retrieval of Historical Nuclear Waste Previously Prepared and Concreted for Sea Disposal

    SciTech Connect (OSTI)

    Abbott, H.; Davies, E.

    2002-02-27

    This paper describes the approach of dealing with an historic legacy of pharmaceutical manufacturing operations, which arose as a result of the temporary cessation of sea disposal in 1983. The result of that cessation was an accumulation of 1,000 reinforced concrete lined steel drums containing intermediate level nuclear waste of mixed chemical and physical form. Included are the steps taken which established a policy, the resulting strategy and the unique and innovative means by which the plan was implemented. The objective was to reduce the financial liability of the waste contained within the drums by removing those portions that had already decayed, segregating the waste in terms of non disposable and disposable isotopes, size reduction and long-term storage of the residues in a retrievable waste form. As part of this process the Company established a UK strategy which would ensure that the Company was self sufficient in radioactive waste handling storage facilities until the provision of a national facility, currently predicted to be approximately 2040.

  12. Tank waste remediation system retrieval and disposal mission initial updated baseline summary

    SciTech Connect (OSTI)

    Swita, W.R.

    1998-01-09

    This document provides a summary of the Tank Waste Remediation System (TWRS) Retrieval and Disposal Mission Initial Updated Baseline (scope, schedule, and cost), developed to demonstrate Readiness-to-Proceed (RTP) in support of the TWRS Phase 1B mission. This Updated Baseline is the proposed TWRS plan to execute and measure the mission work scope. This document and other supporting data demonstrate that the TWRS Project Hanford Management Contract (PHMC) team is prepared to fully support Phase 1B by executing the following scope, schedule, and cost baseline activities: Deliver the specified initial low-activity waste (LAW) and high-level waste (HLW) feed batches in a consistent, safe, and reliable manner to support private contractors` operations starting in June 2002; Deliver specified subsequent LAW and HLW feed batches during Phase 1B in a consistent, safe, and reliable manner; Provide for the interim storage of immobilized HLW (IHLW) products and the disposal of immobilized LAW (ILAW) products generated by the private contractors; Provide for disposal of byproduct wastes generated by the private contractors; and Provide the infrastructure to support construction and operations of the private contractors` facilities.

  13. Tank waste remediation system retrieval and disposal mission -- Phase 1: Financial analysis

    SciTech Connect (OSTI)

    Bickford, J.C.

    1998-01-06

    In Section 1.0, an overview of the Financial Analysis was provided and summarized in Table 1 for both the Retrieval and Disposal program and the TWRS project life cycle. A table recaps the pre-Phase 1B analysis budget requirements as discussed in previous sections. Another table in this section shows a similar build-up of costs and the impact of proposed offsets and increases to the pre-Phase 1B analysis. The issues concerning the increased requirements in FY 1998/1999 and the recommended adjustments were discussed. The Phase 1B Program as recommended is achievable. Specific recommendations are as follows: (a) Adopt the revised project baseline as presented in the cited tables; (b) Incorporate the $248.5 million in allowances for risk into the baseline; (c) Develop detailed action plans to realize the costs reduction opportunities; (d) Incorporate site indirect and benefits reduction rates into baseline; (e) Delay non-critical path scope which can be moved beyond FY 1999, as indicated: and (f) Renegotiate the Tri-Party Agreement milestones associated with the current compliance unfunded list for FY 1998.

  14. Long Length Contaminated Equipment Retrieval System Receiver Trailer and Transport Trailer Operations and Maintenance Manual

    SciTech Connect (OSTI)

    DALE, R.N.

    2000-05-01

    A system to accommodate the removal of long-length contaminated equipment (LLCE) from Hanford underground radioactive waste storage tanks was designed, procured, and demonstrated, via a project activity during the 1990s. The system is the Long Length Contaminated Equipment Removal System (LLCERS). LLCERS will be maintained and operated by Tank Farms Engineering and Operations organizations and other varied projects having a need for the system. The responsibility for the operation and maintenance of the LLCERS Receiver Trailer (RT) and Transport Trailer (TT) resides with the RPP Characterization Project Operations organization. The purpose of this document is to provide vendor supplied operating and maintenance (O & M) information for the RT and TT in a readily retrievable form. This information is provided this way instead of in a vendor information (VI) file to maintain configuration control of the operations baseline as described in RPP-6085, ''Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers''. Additional Operations Baseline documents are identified in RPP-6085.

  15. DOE - NNSA/NFO -- Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Strategic Plan The primary role of the Nevada Field Office is to ensure the successful accomplishment of assigned activities in a safe, secure, efficient, and environmentally responsible manner. Nevada Field Office current missions are: National Security - Support the Stockpile Stewardship Program through subcritical and other weapons physics experiments, nuclear test readiness, emergency management, training and

  16. Tank waste remediation system configuration management implementation plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  17. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  18. Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  19. Hanford Waste Transfer Planning and Control - 13465

    SciTech Connect (OSTI)

    Kirch, N.W.; Uytioco, E.M.; Jo, J. [Washington River Protection Solutions, LLC, Richland, Washington (United States)] [Washington River Protection Solutions, LLC, Richland, Washington (United States)

    2013-07-01

    Hanford tank waste cleanup requires efficient use of double-shell tank space to support single-shell tank retrievals and future waste feed delivery to the Waste Treatment and Immobilization Plant (WTP). Every waste transfer, including single-shell tank retrievals and evaporator campaign, is evaluated via the Waste Transfer Compatibility Program for compliance with safety basis, environmental compliance, operational limits and controls to enhance future waste treatment. Mixed radioactive and hazardous wastes are stored at the Hanford Site on an interim basis until they can be treated, as necessary, for final disposal. Implementation of the Tank Farms Waste Transfer Compatibility Program helps to ensure continued safe and prudent storage and handling of these wastes within the Tank Farms Facility. The Tank Farms Waste Transfer Compatibility Program is a Safety Management Program that is a formal process for evaluating waste transfers and chemical additions through the preparation of documented Waste Compatibility Assessments (WCA). The primary purpose of the program is to ensure that sufficient controls are in place to prevent the formation of incompatible mixtures as the result of waste transfer operations. The program defines a consistent means of evaluating compliance with certain administrative controls, safety, operational, regulatory, and programmatic criteria and specifies considerations necessary to assess waste transfers and chemical additions. Current operations are most limited by staying within compliance with the safety basis controls to prevent flammable gas build up in the tank headspace. The depth of solids, the depth of supernatant, the total waste depth and the waste temperature are monitored and controlled to stay within the Compatibility Program rules. Also, transfer planning includes a preliminary evaluation against the Compatibility Program to assure that operating plans will comply with the Waste Transfer Compatibility Program. (authors)

  20. MWRRET Value-Added Product: The Retrieval of Liquid Water Path...

    Office of Scientific and Technical Information (OSTI)

    public from the National Technical Information Service, Springfield, VA at www.ntis.gov. ... microwave radiometer (MWR) Retrieval (MWRRET) value-added product (VAP) algorithm. ...

  1. MWRRET Value-Added Product: The Retrieval of Liquid Water Path...

    Office of Scientific and Technical Information (OSTI)

    MWRRET Value-Added Product: The Retrieval of Liquid Water Path and Precipitable Water Vapor from Microwave Radiometer (MWR) Data Sets (Revision 2) Citation Details In-Document ...

  2. Radiology-led Follow-up System for IVC Filters: Effects on Retrieval Rates and Times

    SciTech Connect (OSTI)

    Lee, L.; Taylor, J.; Munneke, G.; Morgan, R.; Belli, A.-M.

    2012-04-15

    Purpose: Successful IVC filter retrieval rates fall with time. Serious complications have been reported following attempts to remove filters after 3-18 months. Failed retrieval may be associated with adverse clinical sequelae. This study explored whether retrieval rates are improved if interventional radiologists organize patient follow-up, rather than relying on the referring clinicians. Methods: Proactive follow-up of patients who undergo filter placement was implemented in May 2008. At the time of filter placement, a report was issued to the referring consultant notifying them of the advised timeframe for filter retrieval. Clinicians were contacted to arrange retrieval within 30 days. We compared this with our practice for the preceding year. Results: The numbers of filters inserted during the two time periods was similar, as were the numbers of retrieval attempts and the time scale at which they occurred. The rate of successful retrievals increased but not significantly. The major changes were better documentation of filter types and better clinical follow-up. After the change in practice, only one patient was lost to follow-up compared with six the preceding year. Conclusions: Although there was no significant improvement in retrieval rates, the proactive, radiology-led approach improved follow-up and documentation, ensuring that a clinical decision was made about how long the filter was required and whether retrieval should be attempted and ensuring that patients were not lost to follow-up.

  3. The Dependence of Cirrus Cloud-Property Retrievals on Size-Distributio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    path (IWP), effective particle size (Deff), and visible extinction optical thickness (tau). During this past year we began comparing our cirrus retrieval results with aircraft...

  4. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  5. Next-Generation Search Engines for Information Retrieval

    SciTech Connect (OSTI)

    Devarakonda, Ranjeet; Hook, Leslie A; Palanisamy, Giri; Green, James M

    2011-01-01

    In the recent years, there have been significant advancements in the areas of scientific data management and retrieval techniques, particularly in terms of standards and protocols for archiving data and metadata. Scientific data is rich, and spread across different places. In order to integrate these pieces together, a data archive and associated metadata should be generated. Data should be stored in a format that can be retrievable and more importantly it should be in a format that will continue to be accessible as technology changes, such as XML. While general-purpose search engines (such as Google or Bing) are useful for finding many things on the Internet, they are often of limited usefulness for locating Earth Science data relevant (for example) to a specific spatiotemporal extent. By contrast, tools that search repositories of structured metadata can locate relevant datasets with fairly high precision, but the search is limited to that particular repository. Federated searches (such as Z39.50) have been used, but can be slow and the comprehensiveness can be limited by downtime in any search partner. An alternative approach to improve comprehensiveness is for a repository to harvest metadata from other repositories, possibly with limits based on subject matter or access permissions. Searches through harvested metadata can be extremely responsive, and the search tool can be customized with semantic augmentation appropriate to the community of practice being served. One such system, Mercury, a metadata harvesting, data discovery, and access system, built for researchers to search to, share and obtain spatiotemporal data used across a range of climate and ecological sciences. Mercury is open-source toolset, backend built on Java and search capability is supported by the some popular open source search libraries such as SOLR and LUCENE. Mercury harvests the structured metadata and key data from several data providing servers around the world and builds a

  6. Cross-language information retrieval using PARAFAC2.

    SciTech Connect (OSTI)

    Bader, Brett William; Chew, Peter; Abdelali, Ahmed; Kolda, Tamara Gibson

    2007-05-01

    A standard approach to cross-language information retrieval (CLIR) uses Latent Semantic Analysis (LSA) in conjunction with a multilingual parallel aligned corpus. This approach has been shown to be successful in identifying similar documents across languages - or more precisely, retrieving the most similar document in one language to a query in another language. However, the approach has severe drawbacks when applied to a related task, that of clustering documents 'language-independently', so that documents about similar topics end up closest to one another in the semantic space regardless of their language. The problem is that documents are generally more similar to other documents in the same language than they are to documents in a different language, but on the same topic. As a result, when using multilingual LSA, documents will in practice cluster by language, not by topic. We propose a novel application of PARAFAC2 (which is a variant of PARAFAC, a multi-way generalization of the singular value decomposition [SVD]) to overcome this problem. Instead of forming a single multilingual term-by-document matrix which, under LSA, is subjected to SVD, we form an irregular three-way array, each slice of which is a separate term-by-document matrix for a single language in the parallel corpus. The goal is to compute an SVD for each language such that V (the matrix of right singular vectors) is the same across all languages. Effectively, PARAFAC2 imposes the constraint, not present in standard LSA, that the 'concepts' in all documents in the parallel corpus are the same regardless of language. Intuitively, this constraint makes sense, since the whole purpose of using a parallel corpus is that exactly the same concepts are expressed in the translations. We tested this approach by comparing the performance of PARAFAC2 with standard LSA in solving a particular CLIR problem. From our results, we conclude that PARAFAC2 offers a very promising alternative to LSA not only for

  7. 2014 Energy Sector Specific Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sector-Specific Plan Energy Sector-Specific Plan 2015 ii Page intentionally left blank Energy Sector-Specific Plan 2015 iii TABLE OF CONTENTS PREFACE ......

  8. planning | OpenEI Community

    Open Energy Info (EERE)

    planning Home Jweers's picture Submitted by Jweers(88) Contributor 27 September, 2012 - 07:53 Detailed Planning Kicks Off planning Skype call this morning to discuss details. More...

  9. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  10. Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk

    SciTech Connect (OSTI)

    Hall, C.E.

    1998-01-06

    In September 1996, the US Department of Energy, Richland Operations Office (RL) initiated the first of a two-phase program to remediate waste storage in tanks at the Hanford Site in Washington State. Initiating the first phase, RL signed contracts with two private companies who agreed to receive and vitrify a portion of the tank waste in a demonstration and to return the vitrified product and by-products to the Project Management Hanford Contract (PHMC) team for disposition. The first phase of the overall remediation effort is a demonstration of treatment concepts, and the second phase includes treatment of the remaining tank wastes. The demonstration phase, Phase 1 of the project, is further subdivided into two parts, A and B. During Phase 1A, the vitrification contractors are to establish the technical, operational, regulatory, business, and financial elements required to provide treatment services on a fixed unit price basis. Phase 1A deliverables will be evaluated by RL to determine whether it is in the best interest of the government to have one or more vitrification contractors proceed with Phase 1B, in which 6% to 13% of the tank waste would be treated in the demonstration. In addition, before RL can authorize proceeding with Phase 1B, the PHMC team must demonstrate its readiness to retrieve and deliver the waste to the private contractor(s) and to receive and dispose of the products and by-products returned from the treatment. The PHMC team has organized their plans for providing these vitrification-support services into the Retrieval and Disposal Mission within the Tank Waste Remediation System (TWRS) Project. Three RL core teams were established to assist in evaluating the PHMC team`s readiness specifically in regard to three task areas: Waste feed delivery; Infrastructure and by-products delivery; and Immobilized products. The core teams each developed a set of criteria and plans to be used in evaluating the PHMC team`s readiness to proceed (RTP).

  11. ARM - MC3E Planning - Data Plots

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govField CampaignsMidlatitude Continental Convective Clouds Experiment (MC3E)Data Plots Related Links MC3E Home News News & Press MC3E Backgrounder (PDF, 1.61MB) SGP Images ARM flickr site Field Blog ARM Data Discovery Browse Data Deployment Operations Measurements Science Plan (PDF, 3.85 MB) Featured Data Plots SGP Data Plots (all) Experiment Planning Steering Committee Science Questions MC3E Proposal Abstract and Related Campaigns Meetings Cloud Life Cycle Working Group Contacts Michael

  12. Retrievable fuel pin end member for a nuclear reactor

    DOE Patents [OSTI]

    Rosa, Jerry M.

    1982-01-01

    A bottom end member (17b) on a retrievable fuel pin (13b) secures the pin (13b) within a nuclear reactor (12) by engaging on a transverse attachment rail (18) with a spring clip type of action. Removal and reinstallation if facilitated as only axial movement of the fuel pin (13b) is required for either operation. A pair of resilient axially extending blades (31) are spaced apart to define a slot (24) having a seat region (34) which receives the rail (18) and having a land region (37), closer to the tips (39) of the blades (31) which is normally of less width than the rail (18). Thus an axially directed force sufficient to wedge the resilient blades (31) apart is required to emplace or release the fuel pin (13b) such force being greater than the axial forces on the fuel pins (13b) which occur during operation of the reactor (12).

  13. A specialized framework for data retrieval Web applications

    SciTech Connect (OSTI)

    Jerzy Nogiec; Kelley Trombly-Freytag; Dana Walbridge

    2004-07-12

    Although many general-purpose frameworks have been developed to aid in web application development, they typically tend to be both comprehensive and complex. To address this problem, a specialized server-side Java framework designed specifically for data retrieval and visualization has been developed. The framework's focus is on maintainability and data security. The functionality is rich with features necessary for simplifying data display design, deployment, user management and application debugging, yet the scope is deliberately kept limited to allow for easy comprehension and rapid application development. The system clearly decouples the application processing and visualization, which in turn allows for clean separation of layout and processing development. Duplication of standard web page features such as toolbars and navigational aids is therefore eliminated. The framework employs the popular Model-View-Controller (MVC) architecture, but it also uses the filter mechanism for several of its base functionalities, which permits easy extension of the provided core functionality of the system.

  14. Method and apparatus for passive refrigerant retrieval and storage

    SciTech Connect (OSTI)

    Squire, D.C.

    1991-12-17

    This patent describes a method of retrieving and storing refrigerant from a cooling system being serviced of the type having a compressor for circulating a compressible refrigerant in a closed, pressurized system between a condenser and an evaporator to provide a cooling effect. It comprises: connecting one end of a refrigerant collector tube contained within a housing to the cooling system at the condenser outlet; connecting the interior of the housing to the compressor inlet; operating the cooling system compressor to pressurize refrigerant in the cooling system and pump the refrigerant into the collector tube; and discharging refrigerant from the collector tube into the housing interior through a metering valve where the refrigerant pressure is reduced and evaporates and cools the refrigerant remaining in the tube and the evaporated refrigerant is drawn into the compressor inlet whereby the refrigerant becomes trapped within the housing.

  15. Decontamination system study for the Tank Waste Retrieval System

    SciTech Connect (OSTI)

    Reutzel, T.; Manhardt, J.

    1994-05-01

    This report summarizes the findings of the Idaho National Engineering Laboratory`s decontamination study in support of the Tank Waste Retrieval System (TWRS) development program. Problems associated with waste stored in existing single shell tanks are discussed as well as the justification for the TWRS program. The TWRS requires a decontamination system. The subsystems of the TWRS are discussed, and a list of assumptions pertinent to the TWRS decontamination system were developed. This information was used to develop the functional and operational requirements of the TWRS decontamination system. The requirements were combined with a comprehensive review of currently available decontamination techniques to produced a set of evaluation criteria. The cleaning technologies and techniques were evaluated, and the CO{sub 2} blasting decontamination technique was chosen as the best technology for the TWRS.

  16. EM’s Office of River Protection Completes Waste Retrieval in Another Hanford Tank

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – The EM Office of River Protection (ORP) and its tank operations contractor Washington River Protection Solutions completed waste retrieval activities in tank C-102, marking the 14th single-shell tank retrieved at C tank farm at the Hanford Site.

  17. Performance Evaluation and Measurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 4 PEMP ORGANIZATION Fee Determining Official ... Evaluation and Measurement Plan (PEMP) is an award fee plan containing both ...

  18. Monitored retrievable storage submission to Congress: Volume 2, Environmental assessment for a monitored retrievable storage facility. [Contains glossary

    SciTech Connect (OSTI)

    1986-02-01

    This Environmental Assessment (EA) supports the DOE proposal to Congress to construct and operate a facility for monitored retrievable storage (MRS) of spent fuel at a site on the Clinch River in the Roane County portion of Oak Ridge, Tennessee. The first part of this document is an assessment of the value of, need for, and feasibility of an MRS facility as an integral component of the waste management system. The second part is an assessment and comparison of the potential environmental impacts projected for each of six site-design combinations. The MRS facility would be centrally located with respect to existing reactors, and would receive and canister spent fuel in preparation for shipment to and disposal in a geologic repository. 207 refs., 57 figs., 132 tabs.

  19. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2015 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  20. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory-Directed Research and Development Program FY2016 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2016 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including

  1. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2014 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  2. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  3. DOE Retro Analysis Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for

  4. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements between the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public Involvement PO Box 1663, MS M996 Los Alamos, NM 87544 (505) 667-0216 Email We welcome your comments and suggestions on how

  5. Plan Design Highlights for:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LEGAL NOTICES: Access federal and state legal notices related to your plan: deltadentalins.com/about/legal/index-enrollee.html 1 In Texas, Delta Dental Insurance Company offers a Dental Provider Organization (DPO) plan. 2 Enrollees are responsible for any coinsurance, deductible, amount over the plan maximum and charges for non-covered services. 3 Verify that your dentist is a contracted Delta Dental PPO network dentist before each appointment. 4 Applies only to procedures covered under your

  6. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Relations Plan Community Relations Plan The Laboratory maintains an open working relationship with communities and interested members of the public. August 1, 2013 Guests listen to Lab historian Ellen McGhee on tour of historical sites Guests listen to Laboratory historian Ellen McGhee on a tour of historical sites. What the plan does Establishes a productive government-to-government relationship with local tribes and pueblos Keeps communities and interested members of the public

  7. Gyroharmonic conversion experiments

    SciTech Connect (OSTI)

    Hirshfield, J.L.; LaPointe, M.A.; Ganguly, A.K. [Omega-P, Inc., New Haven, Connecticut 06520 (United States); LaPointe, M.A. [Yale University, New Haven, Connecticut 06511 (United States)

    1999-05-01

    Generation of high power microwaves has been observed in experiments where a 250{endash}350 kV, 20{endash}30 A electron beam accelerated in a cyclotron autoresonance accelerator (CARA) passes through a cavity tuned gyroharmonic) and at 8.6 GHz (3rd harmonic) will be described. Theory indicates that high conversion efficiency can be obtained for a high quality beam injected into CARA, and when mode competition can be controlled. Comparisons will be made between the experiments and theory. Planned 7th harmonic experiments will also be described, in which phase matching between the TE-72 mode at 20 GHz, and the TE-11 mode at 2.86 GHz, allows efficient 20 GHz co-generation within the CARA waveguide itself. {copyright} {ital 1999 American Institute of Physics.}

  8. Gyroharmonic conversion experiments

    SciTech Connect (OSTI)

    Hirshfield, J. L.; LaPointe, M. A. [Omega-P, Inc., New Haven, Connecticut 06520 (United States); Yale University, New Haven, Connecticut 06511 (United States); Ganguly, A. K. [Omega-P, Inc., New Haven, Connecticut 06520 (United States)

    1999-05-07

    Generation of high power microwaves has been observed in experiments where a 250-350 kV, 20-30 A electron beam accelerated in a cyclotron autoresonance accelerator (CARA) passes through a cavity tuned gyroharmonic) and at 8.6 GHz (3rd harmonic) will be described. Theory indicates that high conversion efficiency can be obtained for a high quality beam injected into CARA, and when mode competition can be controlled. Comparisons will be made between the experiments and theory. Planned 7th harmonic experiments will also be described, in which phase matching between the TE-72 mode at 20 GHz, and the TE-11 mode at 2.86 GHz, allows efficient 20 GHz co-generation within the CARA waveguide itself.

  9. Training Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for system/software development and installation Training Plan (63.82 KB) More Documents & Publications System Design Transition Plan Conversion Plan

  10. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Reciprocating Internal Combustion Engine Fossil Fuel Turbines Alaska Energy Statistics, 2011 4 Energy Costs Vary 5 Regional Energy Planning * Energy Pathways led to ...

  11. planning for emergencies

    National Nuclear Security Administration (NNSA)

    1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

  12. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by ... Laboratory Director, Operations Princeton Plasma Physics Laboratory December 2014 FY 2015 ...

  13. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  14. BPA Energy Efficiency Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

  15. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AEA is an independent and public corporation of the State of Alaska Created by ... for final draft development and interface with AkAES 7 Alaska's Energy Plans ...

  16. Site Sustainability Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Regional and Local Planning ......10.2 Emergency Response Procedures and ... the prospects and problems of post-remediation care ...

  17. DOE CONTRACTOR PENSION PLANS

    Energy Savers [EERE]

    Contractor's workforce and sponsors the employee pension and benefit plans; or (b) ... DOE-H-200x EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation ...

  18. DRAFT Bear Safety Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bear Safety Plan June 2010 NSAbspRev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility North Slope of AlaskaAdjacent Arctic Ocean (ACRFNSAAAO) Bear Safety ...

  19. STANDARD REVIEW PLAN

    Office of Environmental Management (EM)

    of Nuclear Facilities Standard Review Plan Safety Design Strategy January 2015 OFFICE OF ENVIRONMENTAL MANAGEMENT ... safety, environment, security, and quality assurance, ...

  20. Visual Sample Plan Flyer

    Office of Energy Efficiency and Renewable Energy (EERE)

    This flyer better explains that VSP is a free, easy-to-use software tool that supports development of optimal sampling plans based on statistical sampling theory.

  1. Long Range Development Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scientific missions. Science drives the Lab's development. LRDPs establish a framework of land-use principles and policies to guide future growth and change through 2025. The plan...

  2. Site Transition Plan Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Guidance Site Transition Plan Guidance Site Transition Plan Guidance PDF icon Site Transition Plan Guidance More Documents & Publications Development of Site Transition Plan, ...

  3. Tank waste remediation system retrieval and disposal mission readiness-to-proceed responses to internal independent assessment

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-01-06

    The US Department of Energy (DOE) is planning to make critical decisions during fiscal year (FY) 1998 regarding privatization contracts for the treatment of Hanford tank waste. Specifically, DOE, Richland Operations Office (RL), will make decisions related to proceeding with Phase 1 Privatization. In support of these decisions, the management and integration (M+I) contractor must be able to meet the requirements to support the Phase 1 privatization contractors. As part of the assessment of the Tank Waste Retrieval (TWR) Readiness-To-Proceed (RTP), an independent review of their process and products was required by the RL letter of August 8, 1997. The Independent Review Team reviewed the adequacy of the planning that has been done by the M+I contractor to validate that, if the plans are carried out, there is reasonable assurance of success. Overall, the RTP Independent Review Team concluded that, if the planning by the M+I contractor team is carried out with adequate funding, there is reasonable assurance that the M+I contractor will be able to deliver waste to the privatization contractor for the duration of Phase 1. This conclusion was based on addressing the recommendations contained in the Independent Review Team`s Final Report and in the individual Criteria and Review Approach (CRA) forms completed during the assessment. The purpose of this report is to formally document the independent assessment and the RTP team responses to the Independent Review Team recommendations. It also provides closure logics for selected recommendations from a Lockheed Martin Hanford Corporation (LMHC) internal assessment of the Technical Basis Review (TBR) packages. This report contains the RTP recommendation closure process (Section 2.0); the closure tables (Section 3.0) which provide traceability between each review team recommendation and its corresponding Project Hanford Management Contract closure logic; and two attachments that formally document the Independent Review Team

  4. Ecology WTP Recovery Plan comments ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SSTs are to be retrieved during the coming year from the pool of tanks approved by Ecology (Appendix I, Section 2.1.2) have already been established to maintain and monitor...

  5. Northern Arizona University: Business Plan

    Broader source: Energy.gov (indexed) [DOE]

    ... 13 REFERENCES Reuters Disaster Relief Statistics (n.d.), Reuters, Retrieved November 16, ... of Disaster Resilience in the Built Environment, Vol. 1 Iss: 1, pp.103 - 122 Henry, P. ...

  6. AMF Deployment, Graciosa Island, Azores

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graciosa Island Home Data Plots and Baseline Instruments Satellite Retrievals Experiment Planning CAP-MBL Proposal Abstract and Related Campaigns Science Questions Science Plan...

  7. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  8. Second ILAW Site Borehole Characterization Plan

    SciTech Connect (OSTI)

    SP Reidel

    2000-08-10

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive tank waste in the US. High-level radioactive waste has been stored at Hanford since 1944. Approximately 209,000 m{sup 3} (54 Mgal) of waste are currently stored in 177 tanks. Vitrification and onsite disposal of low-activity tank waste (LAW) are embodied in the strategy described in the Tri-Party Agreement. The tank waste is to be retrieved, separated into low- and high-level fractions, and then immobilized. The low-activity vitrified waste will be disposed of in the 200 East Area of the Hanford Site. This report is a plan to drill and characterize the second borehole for the Performance Assessment. The first characterization borehole was drilled in 1998. The plan describes data collection activities for determining physical and chemical properties of the vadose zone and saturated zone on the northeast side of the proposed disposal site. These data will then be used in the 2005 Performance Assessment.

  9. Hanford tanks initiative plan

    SciTech Connect (OSTI)

    McKinney, K.E.

    1997-07-01

    Abstract: The Hanford Tanks Initiative (HTI) is a five-year project resulting from the technical and financial partnership of the U.S. Department of Energy`s Office of Waste Management (EM-30) and Office of Science and Technology Development (EM-50). The HTI project accelerates activities to gain key technical, cost performance, and regulatory information on two high-level waste tanks. The HTI will provide a basis for design and regulatory decisions affecting the remainder of the Tank Waste Remediation System`s tank waste retrieval Program.

  10. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan (4.52 MB) More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  11. 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2012 Annual Plan Section 999: 2012 Annual Plan Section 999 - 2012 Annual Plan (3.97 MB) More Documents & Publications 2011 Annual Plan Sec. 999 Annual Plan 2012 2013 Annual Plan

  12. Ignition Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ignition experiments Ignition Experiments The goal of many NIF experiments is to create a self-sustaining "burn" of fusion fuel (the hydrogen isotopes deuterium and tritium) that produces as much or more energy than the energy required to initiate the fusion reaction-an event called ignition. In moving closer to achieving ignition, NIF researchers are fulfilling the vision of early laser pioneers who conceived of using the x rays generated by a powerful, brief laser pulse to fuse

  13. Workshop on the preparation of climate change action plans. Workshop summary

    SciTech Connect (OSTI)

    1999-05-24

    Over 130 participants from more than 27 countries shared experiences of developing and transition countries in preparation and development of their climate change national action plans. International experts guided countries in preparation of their climate change national action plans.

  14. Strategic Energy Planning

    Broader source: Energy.gov [DOE]

    Comprehensive strategic energy planning, whether at the state, local, or tribal level, is a critical building block for sound energy management and for advancing a clean energy economy in your jurisdiction. Use these resources—including step-by-step guides, tools, templates, trends, and examples—to develop a strategic energy plan.

  15. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  16. WREP Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  17. Single-shell tank closure work plan. Revision A

    SciTech Connect (OSTI)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  18. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    SciTech Connect (OSTI)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach to waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List

  19. Direct single-shot phase retrieval from the diffraction pattern of separated objects

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Leshem, Ben; Xu, Rui; Dallal, Yehonatan; Miao, Jianwei; Nadler, Boaz; Oron, Dan; Dudovich, Nirit; Raz, Oren

    2016-02-22

    The non-crystallographic phase problem arises in numerous scientific and technological fields. An important application is coherent diffractive imaging. Recent advances in X-ray free-electron lasers allow capturing of the diffraction pattern from a single nanoparticle before it disintegrates, in so-called ‘diffraction before destruction’ experiments. Presently, the phase is reconstructed by iterative algorithms, imposing a non-convex computational challenge, or by Fourier holography, requiring a well-characterized reference field. Here we present a convex scheme for single-shot phase retrieval for two (or more) sufficiently separated objects, demonstrated in two dimensions. In our approach, the objects serve as unknown references to one another, reducing themore » phase problem to a solvable set of linear equations. We establish our method numerically and experimentally in the optical domain and demonstrate a proof-of-principle single-shot coherent diffractive imaging using X-ray free-electron lasers pulses. Lastly, our scheme alleviates several limitations of current methods, offering a new pathway towards direct reconstruction of complex objects.« less

  20. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  1. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  2. Qualification of Three On-line Slurry Monitoring Devices for Application during Waste Retrieval Operations at DOE Sites

    SciTech Connect (OSTI)

    Bontha, Jagannadha R.; Bamberger, Judith A.; Hylton, Tom D.; May, T. H.

    2000-10-18

    Qualification of Three On-line Slurry Monitoring Devices for Application during Waste Retrieval Operations at DOE Sites

  3. ACQUISITION PLANNING | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning

    ACQUISITION PLANNING (742.74 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2015-13

  4. Monitored retrievable storage facility site screening and evaluation report

    SciTech Connect (OSTI)

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed site and facility designs...'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluated potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the task force presented in this report includes: site screening (Sections 3, 4, and 5), the MRS facilities which are to be sited are described; the criteria, process and outcome of the screening process is presented; and descriptions of the candidate MRS facility sites are given, and site evaluations (Sections 6 through 9) where the rational for the site evaluations are presented, along with each evaluation and findings of the Task Force.

  5. Numerical and experimental analysis of a retrievable offshore loading facility

    SciTech Connect (OSTI)

    Sterndorff, M.J.; O`Brien, P.

    1995-12-31

    ROLF (Retrievable Offshore Loading Facility) has been proposed as an alternative offshore oil export tanker loading system for the North Sea. The system consists of a flexible riser ascending from the seabed in a lazy wave configuration to the bow of a dynamically positioned tanker. In order to supplant and support the numerical analyses performed to design the system, an extensive model test program was carried out in a 3D offshore basin at scale 1:50. A model riser with properties equivalent to the properties of the oil filled prototype riser installed in seawater was tested in several combinations of waves and current. During the tests the forces at the bow of the tanker and at the pipeline end manifold were measured together with the motions of the tanker and the riser. The riser motions were measured by means of a video based 3D motion monitoring system. Of special importance was accurate determination of the minimum bending radius for the riser. This was derived based on the measured riser motions. The results of the model tests were compared to numerical analyses by an MCS proprietary riser analysis program.

  6. Nonlinear, noniterative, single-distance phase retrieval and developmental biology

    SciTech Connect (OSTI)

    Moosmann, Julian; Altapova, Venera; Haenschke, Daniel; Hofmann, Ralf; Baumbach, Tilo

    2012-05-17

    For coherent X-ray imaging, based on phase contrast through free-space Fresnel propagation, we discuss two noniterative, nonlinear approaches to the phase-retrieval problem from a single-distance intensity map of a pure-phase object. On one hand, a perturbative set-up is proposed where nonlinear corrections to the linearized transport-of-intensity situation are expanded in powers of the object-detector distance z and are evaluated in terms of the linear estimate. On the other hand, a nonperturbative projection algorithm, which is based on the (linear and local) contrast-transfer function (CTF), works with an effective phase in Fourier space. This effective phase obeys a modified CTF relation between intensity contrast at z > 0 and phase contrast at z= 0: Unphysical singularities of the local CTF model are cut off to yield 'quasiparticles' in analogy to the theory of the Fermi liquid. By identifying the positions of the zeros of the Fourier transformed intensity contrast as order parameters for the dynamical breaking of scaling symmetry we investigate the phase structure of the forward-propagation problem when interpreted as a statistical system. Results justify the quasiparticle approach for a wide range of intermediary phase variations. The latter algorithm is applied to data from biological samples recorded at the beamlines TopoTomo and ID19 at ANKA and ESRF, respectively.

  7. Sustainability Considerations in Spent Light-water Nuclear Fuel Retrievability

    SciTech Connect (OSTI)

    Wood, Thomas W.; Rothwell, Geoffrey

    2012-01-10

    This paper examines long-term cost differences between two competing Light Water Reactor (LWR) fuels: Uranium Oxide (UOX) and Mixed Uranium Oxide-Plutonium Oxide (MOX). Since these costs are calculated on a life-cycle basis, expected savings from lower future MOX fuel prices can be used to value the option of substituting MOX for UOX, including the value of maintaining access to the used UOX fuel that could be reprocessed to make MOX. The two most influential cost drivers are the price of natural uranium and the cost of reprocessing. Significant and sustained reductions in reprocessing costs and/or sustained increases in uranium prices are required to give positive value to the retrievability of Spent Nuclear Fuel. While this option has positive economic value, it might not be exercised for 50 to 200 years. Therefore, there are many years for a program during which reprocessing technology can be researched, developed, demonstrated, and deployed. Further research is required to determine whether the cost of such a program would yield positive net present value and/or increases the sustainability of LWR energy systems.

  8. Monitored Retrievable Storage facility site screening and evaluation report

    SciTech Connect (OSTI)

    none,

    1985-05-01

    The Nuclear Waste Policy Act of 1982 directs the Department of Energy to complete a detailed study of the need for and feasibility of, and to submit to the Congress a proposal for, the construction of one or more monitored retrievable storage facilities for high level radioactive waste and spent nuclear fuel.'' The Act directs that the proposal includes site specific designs. Further, the proposal is to include, for the first such facility, at least three alternative sites and at least five alternative combinations of such proposed sites and facility designs {hor ellipsis}'' as well as a recommendation of the combination among the alternatives that the Secretary deems preferable.'' An MRS Site Screening Task Force has been formed to help identify and evaluate potential MRS facility sites within a preferred region and with the application of a siting process and criteria developed by the DOE. The activities of the Task Force presented in this report, all site evaluations (sections 13 through 16) where the rationale for the site evaluations are presented, along with each evaluation and findings of the Task Force. This is Volume 3 of a three volume document. References are also included in this volume.

  9. Re-evaluation of monitored retrievable storage concepts

    SciTech Connect (OSTI)

    Fletcher, J.F.; Smith, R.I.

    1989-04-01

    In 1983, as a prelude to the monitored retrievable storage (MRS) facility conceptual design, the Pacific Northwest Laboratory (PNL) conducted an evaluation for the US Department of Energy (DOE) that examined alternative concepts for storing spent LWR fuel and high- level wastes from fuel reprocessing. The evaluation was made considering nine concepts for dry away-from-reactor storage. The nine concepts evaluated were: concrete storage cask, tunnel drywell, concrete cask-in-trench, open-cycle vault, metal casks (transportable and stationary), closed-cycle vault, field drywell, and tunnel-rack vault. The purpose and scope of the re-evaluation did not require a repetition of the expert-based examinations used earlier. Instead, it was based on more detailed technical review by a small group, focusing on changes that had occurred since the initial evaluation was made. Two additional storage concepts--the water pool and the horizontal modular storage vault (NUHOMS system)--were ranked along with the original nine. The original nine concepts and the added two conceptual designs were modified as appropriate for a scenario with storage capacity for 15,000 MTU of spent fuel. Costs, area requirements, and technical and historical data pertaining to MRS storage were updated for each concept.

  10. Retrieval Of Hanford's Single Shell Nuclear Waste Tanks Using Technologies Foreign And Domestic

    SciTech Connect (OSTI)

    Eacker, J. A.; Thompson, W. T.; Gibbons, P. W.

    2003-02-26

    Significant progress has been made on the Hanford single shell tank (SST) retrieval projects since they were initiated as part of the modified Hanford Federal Facility Agreement and Consent Order (Tri-party Agreement) in 2000. Four of the 149 SSTs at the U.S. Department of Energy (DOE) Office of River Protection (ORP) Hanford facility are being retrieved to meet Tri-Party Agreement commitments. An additional tank is being retrieved to demonstrate an alternate technical approach. As the Hanford Site transitions to an accelerated retrieval and closure mission, these methods will be the baseline methods for SST retrieval. The five SSTs are located within the Hanford 200- Area tank farms operated by CH2M HILL Hanford Group (CH2M HILL) for ORP. Included in this paper will be discussions on the technologies selected for retrieval of each tank; electrical resistance technologies that are being evaluated for ex-tank leak detection and monitoring; and the Cold Test Training Facility (CTTF) used for testing of and training on the different retrieval systems.

  11. Buried waste integrated demonstration FY 94 deployment plan

    SciTech Connect (OSTI)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document.

  12. Single-shell tank interim stabilization project plan

    SciTech Connect (OSTI)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  13. EMSL Strategic Plan 2008

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-08-15

    This Strategic Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

  14. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  15. Aspen, Colorado: Community Energy Strategic Planning Process | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Aspen, Colorado: Community Energy Strategic Planning Process Aspen, Colorado: Community Energy Strategic Planning Process This presentation features Lee Ledesma, utilities operations manager with the City of Aspen, Colorado. Ledesma provides an overview of the City of Aspen's experience in putting together a financing strategy for meeting community energy goals. View the presentation above or read the transcript.

  16. Functional design criteria, Project W-211, Initial Tank Retrieval Systems. Revision 1

    SciTech Connect (OSTI)

    Rieck, C.A.

    1995-02-07

    This document provides the technical baseline for retrieval of waste from ten double-shell tanks in the SY, AN, AP, AW, AY, and AZ tank farms. In order to retrieve waste from these tanks, systems are needed to mix the sludge with the supernate and pump the waste mixture from the tank. For 101-SY, the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The retrieval scope for the other nine tanks includes both the waste mixing and removal functions.

  17. EM-31 RETRIEVAL KNOWLEDGE CENTER MEETING REPORT: MOBILIZE AND DISLODGE TANK WASTE HEELS

    SciTech Connect (OSTI)

    Fellinger, A.

    2010-02-16

    The Retrieval Knowledge Center sponsored a meeting in June 2009 to review challenges and gaps to retrieval of tank waste heels. The facilitated meeting was held at the Savannah River Research Campus with personnel broadly representing tank waste retrieval knowledge at Hanford, Savannah River, Idaho, and Oak Ridge. This document captures the results of this meeting. In summary, it was agreed that the challenges to retrieval of tank waste heels fell into two broad categories: (1) mechanical heel waste retrieval methodologies and equipment and (2) understanding and manipulating the heel waste (physical, radiological, and chemical characteristics) to support retrieval options and subsequent processing. Recent successes and lessons from deployments of the Sand and Salt Mantis vehicles as well as retrieval of C-Area tanks at Hanford were reviewed. Suggestions to address existing retrieval approaches that utilize a limited set of tools and techniques are included in this report. The meeting found that there had been very little effort to improve or integrate the multiple proven or new techniques and tools available into a menu of available methods for rapid insertion into baselines. It is recommended that focused developmental efforts continue in the two areas underway (low-level mixing evaluation and pumping slurries with large solid materials) and that projects to demonstrate new/improved tools be launched to outfit tank farm operators with the needed tools to complete tank heel retrievals effectively and efficiently. This document describes the results of a meeting held on June 3, 2009 at the Savannah River Site in South Carolina to identify technology gaps and potential technology solutions to retrieving high-level waste (HLW) heels from waste tanks within the complex of sites run by the U. S. Department of Energy (DOE). The meeting brought together personnel with extensive tank waste retrieval knowledge from DOE's four major waste sites - Hanford, Savannah River

  18. Retrieval System for Calcined Waste for the Idaho Cleanup Project - 12104

    SciTech Connect (OSTI)

    Eastman, Randy L.; Johnston, Beau A.; Lower, Danielle E.

    2012-07-01

    This paper describes the conceptual approach to retrieve radioactive calcine waste, hereafter called calcine, from stainless steel storage bins contained within concrete vaults. The retrieval system will allow evacuation of the granular solids (calcine) from the storage bins through the use of stationary vacuum nozzles. The nozzles will use air jets for calcine fluidization and will be able to rotate and direct the fluidization or displacement of the calcine within the bin. Each bin will have a single retrieval system installed prior to operation to prevent worker exposure to the high radiation fields. The addition of an articulated camera arm will allow for operations monitoring and will be equipped with contingency tools to aid in calcine removal. Possible challenges (calcine bridging and rat-holing) associated with calcine retrieval and transport, including potential solutions for bin pressurization, calcine fluidization and waste confinement, are also addressed. The Calcine Disposition Project has the responsibility to retrieve, treat, and package HLW calcine. The calcine retrieval system has been designed to incorporate the functions and technical characteristics as established by the retrieval system functional analysis. By adequately implementing the highest ranking technical characteristics into the design of the retrieval system, the system will be able to satisfy the functional requirements. The retrieval system conceptual design provides the means for removing bulk calcine from the bins of the CSSF vaults. Top-down vacuum retrieval coupled with an articulating camera arm will allow for a robust, contained process capable of evacuating bulk calcine from bins and transporting it to the processing facility. The system is designed to fluidize, vacuum, transport and direct the calcine from its current location to the CSSF roof-top transport lines. An articulating camera arm, deployed through an adjacent access riser, will work in conjunction with the

  19. Mixture Experiments

    SciTech Connect (OSTI)

    Piepel, Gregory F.

    2007-12-01

    A mixture experiment involves combining two or more components in various proportions or amounts and then measuring one or more responses for the resulting end products. Other factors that affect the response(s), such as process variables and/or the total amount of the mixture, may also be studied in the experiment. A mixture experiment design specifies the combinations of mixture components and other experimental factors (if any) to be studied and the response variable(s) to be measured. Mixture experiment data analyses are then used to achieve the desired goals, which may include (i) understanding the effects of components and other factors on the response(s), (ii) identifying components and other factors with significant and nonsignificant effects on the response(s), (iii) developing models for predicting the response(s) as functions of the mixture components and any other factors, and (iv) developing end-products with desired values and uncertainties of the response(s). Given a mixture experiment problem, a practitioner must consider the possible approaches for designing the experiment and analyzing the data, and then select the approach best suited to the problem. Eight possible approaches include 1) component proportions, 2) mathematically independent variables, 3) slack variable, 4) mixture amount, 5) component amounts, 6) mixture process variable, 7) mixture of mixtures, and 8) multi-factor mixture. The article provides an overview of the mixture experiment designs, models, and data analyses for these approaches.

  20. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  1. Environmental monitoring plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  2. Standard Review Plan Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the

  3. Aquisition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aquisition Plan Aquisition Plan This template is used for documenting the plans for acquiring hardware, software and communications equipment for a systems development project. Aquisition Plan (51.82 KB) More Documents & Publications Feasibility Study Report Template System Design Training Plan

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  5. Gas generation matrix depletion quality assurance project plan

    SciTech Connect (OSTI)

    NONE

    1998-05-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP).

  6. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  7. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Supersedes DOE G 151.1-1, Volume 2.

  8. Community Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    path to achieve your desired energy future * Clarifies key performance indicators * Documents the game plan for short- and long-term success 3 And what does it do for you? vs. ...

  9. Draft Closure Plan

    Office of Environmental Management (EM)

    ATTACHMENT G.15 TECHNICAL AREA 54, AREA L OUTDOOR CONTAINER STORAGE UNIT CLOSURE PLAN Los Alamos National Laboratory Hazardous Waste Permit December 2014 TABLE OF CONTENTS LIST OF TABLES ....................................................................................................................................... iv LIST OF FIGURES ..................................................................................................................................... v 1.0 INTRODUCTION

  10. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  11. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2014 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER ... within the context of an integrated system of capture, transport, and storage ...

  12. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  13. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    ... Example 23 6.0 Project Execution 6.01 Work Specification and Planning with Safety ... All work will incorporate the core principles of Integrated Safety Management. 6.01.02 ...

  14. Planning for the future

    SciTech Connect (OSTI)

    Lesh, Pamela

    2009-06-15

    Four changes to integrated resource planning could significantly improve alignment between future utility spending and the forces and changes that are upending past preconceptions of how to predict future load. (author)

  15. SNL Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... of concern CRP Community Relations Plan DOD U.S. Department of Defense DOE U.S. ... Tours DOE and the Department of Defense (DOD) provide information about ongoing ...

  16. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  17. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  18. PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples

    Office of Environmental Management (EM)

    Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below ...

  19. Report: Strategic Planning Impacts

    Office of Environmental Management (EM)

    Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM

  20. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  1. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP)

  2. Career Planning - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    banner-career-planning Career Planning for the Nuclear Industry Some people are surprised to learn just how many types of careers exist in the nuclear industry. From construction of nuclear facilities to operation, maintenance and research, many types of skills are needed in Professional, Technician, Engineer and Craft categories. To see types of nuclear industry jobs, click here. To see descriptions of nuclear industry jobs, click here. Whether you are considering a career change or just

  3. Environmental implementation plan

    SciTech Connect (OSTI)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  4. TWRS safety management plan

    SciTech Connect (OSTI)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  5. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 DOE ORDER 436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by Princeton University for the U.S. Department of Energy under contract DE-AC02-09CH1 PLAN APPROVAL Robert S. Sheneman Deputy Head Environment, Safety, Health & Security Department Michael Viola Head, Facilities & Site Services Division Jerry D. Levine Head, Environment, Safety, Health & Security Department William B. Davis Head, Information Technology Department, CIO Michael D. Williams

  6. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's...

  7. System Plan Revision 5 + 6

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Revision 7 General Overview DaBrisha Smith (DOEORP) April 10, 2013 System Plan 101 * What is System Planning - A process used by organizations to design, analyze and define ...

  8. Workforce Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Workforce Planning is an integral part of the human capital planning process. The intent ... The purpose of the workforce Plan is to provide focus and direction to Human Resources ...

  9. Functions and requirements for 105-KE Basin sludge retrieval and packaging

    SciTech Connect (OSTI)

    Feigenbutz, L.V.

    1994-12-16

    Sludge, and the clouding due to sludge, interferes with basin operation and maintenance activities. This document defines the overall functions and requirements for sludge retrieval and packaging activities to be performed in the 105-KE Basin.

  10. Retrievals of Cloud Fraction and Cloud Albedo from Surface-based...

    Office of Scientific and Technical Information (OSTI)

    Ground-based radiation measurements have been widely conducted to gain information on ... Compared to Min2008 and Liu2011, the XL2013 retrieval of cloud albedo tends to be greater ...

  11. Evalution of long-term surface-retrieved cloud-droplet number...

    Office of Scientific and Technical Information (OSTI)

    Evalution of long-term surface-retrieved cloud-droplet number concentration with in situ aircraft observations Citation Details In-Document Search Title: Evalution of long-term ...

  12. Code System for Retrieving EXFOR Cross Section Data According to a Given Target Nucleus.

    Energy Science and Technology Software Center (OSTI)

    1985-10-10

    Version 00 X4R retrieves EXFOR data according to a given target nucleus, reaction type, year range and incident energy range. These are then converted to a data table form which can easily be processed by computer.

  13. Hanford Tank Initiative (HTI) & Acquire Commercial Technology for Retrieval Report & Database

    SciTech Connect (OSTI)

    SEDERBURG, J. P

    2000-08-31

    The data base is an annotated bibliography of technology evaluations and demonstrations conducted in previous years by the Hanford Tank Initiative (HTI) and the Acquire Commercial Technology for Retrieval (ACTR) programs.

  14. ARM - PI Product - MWR Retrievals of Cloud Liquid Water and Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govDataPI Data ProductsMWR Retrievals of Cloud Liquid Water and Water Vapor ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note below or call us...

  15. C-105 heel pit removed and C-105 dome cut paves way for new retrieval...

    Office of Scientific and Technical Information (OSTI)

    Program Document: C-105 heel pit removed and C-105 dome cut paves way for new retrieval technology Citation Details In-Document Search Title: C-105 heel pit removed and C-105 dome ...

  16. Transition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition Plan Transition Plan This template is used to define the objectives, resources, and plans for systems transition, e.g., scheduling the transition from acceptance testing to full operational status, identifying staffing and training needs for system operation and maintenance, planning for data migration, etc Transition Plan (35.86 KB) More Documents & Publications System Design Feasibility Study Report Template Configuration Management Plan

  17. Performance Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plans Performance Plans November 13, 2015 Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan November 6, 2014 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan December 13,

  18. MEASUREMENTS AND RETRIEVALS FROM A NEW 183-GHz WATER VAPOR RADIOMETER IN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    THE ARCTIC MEASUREMENTS AND RETRIEVALS FROM A NEW 183-GHz WATER VAPOR RADIOMETER IN THE ARCTIC Cadeddu, Maria Argonne National Laboratory Category: Instruments A new G-band (183 GHz) vapor radiometer (GVR), developed and built by Prosensing Inc. (http://www.prosensing.com), was deployed in Barrow, Alaska, in April 2005. The radiometer was deployed as part of the ongoing Atmospheric Radiation Measurement (ARM) program's effort to improve water vapor retrievals in the cold, dry Arctic

  19. An approach to interactive retrieval in face image databases based on semantic attributes

    SciTech Connect (OSTI)

    Gudivada, V.N.; Raghavan, V.V.; Seetharaman, G.S.

    1994-12-31

    Image Retrieval (IR) problem is concerned with retrieving images that are relevant to users` requests from a large collection of images, referred to as the image database. A taxonomy for and the limitations of the existing approaches for image retrieval are discussed. Also, to alleviate some of the problems associated with these approaches, a unified framework for retrieval in image databases for a class of application areas is proposed. The framework provides a taxonomy for image attributes and identifies four generic types of retrieval based on the attribute taxonomy. Semantic attributes play a central role in supporting one of those generic retrieval types, referred to as Retrieval by Semantic Attributes (RSA). Semantic attributes are those attributes the specification of which necessarily involves some subjectivity, imprecision, and/or uncertainty. In this paper, we introduce Personal Construct Theory (PCT) as a knowledge elicitation tool for systematically deriving semantic attributes to support RSA in image retrieval applications. As a case study, we use a prototype database system comprising of human face images. The knowledge elicited from the face images is stored in a matrix form which is referred to as repertory grid. We propose an algorithm for RSA based on the repertory grid. The algorithm incorporates user relevance judgments as a means to deal with the inherent problems associated with the specification of semantic attributes. The algorithm incorporates user relevance judgments as a means to deal with the inherent problems associated with the specification of semantic attributes. The algorithm is implemented and tested on the human face image database and the initial results are encouraging. In essence, we have developed an overall methodology/test bed to facilitate experimentation with different algorithms for RSA.

  20. Large-Scale Geospatial Indexing for Image-Based Retrieval and Analysis

    SciTech Connect (OSTI)

    Tobin Jr, Kenneth William; Bhaduri, Budhendra L; Bright, Eddie A; Cheriydat, Anil; Karnowski, Thomas Paul; Palathingal, Paul J; Potok, Thomas E; Price, Jeffery R

    2005-12-01

    We describe a method for indexing and retrieving high-resolution image regions in large geospatial data libraries. An automated feature extraction method is used that generates a unique and specific structural description of each segment of a tessellated input image file. These tessellated regions are then merged into similar groups and indexed to provide flexible and varied retrieval in a query-by-example environment.

  1. Analysis of Langley optical depth data, with aerosol and gas retrievals,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for the RSS 103 instrument in Barrow, Alaska Analysis of Langley optical depth data, with aerosol and gas retrievals, for the RSS 103 instrument in Barrow, Alaska Gianelli, Scott Columbia University - NASA/GISS Lacis, Andrew NASA/Goddard Institute for Space Studies Carlson, Barbara NASA/Goddard Institute for Space Studies Category: Aerosols Bimodal aerosol retrievals, and high-resolution retrevals of nitrogen dioxide, are performed on the Langley optical depth data from the RSS 103 device

  2. Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility. Phase 1

    SciTech Connect (OSTI)

    King, J.W.

    1993-08-01

    The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction.

  3. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides

  4. 2011 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2011 Annual Plan Section 999: 2011 Annual Plan Section 999: 2011 Annual Plan (5.47 MB) More Documents & Publications Recommendations: Draft 2008 Section 999 Annual Plan Sec. 999 Annual Plan 2012 UDAC Meeting - February 2011

  5. ARM - Lesson Plans: Air Pressure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teachers' Toolbox Lesson Plans Lesson Plans: Air Pressure Objective The objective of this ... Important Points to Understand Air has weight and exerts pressure on everything with which ...

  6. 2016 Plan Options for Retirees

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Options 2016 Plan Options for Retirees Information for LANS retirees Contacts Retiree Insurance Providers Non-Medicare retirees HDHP plan highlights (pdf) HDHP summary of benefits...

  7. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan - Other plans (SiteFacilities, WFD, etc) * Execute--perform technical & business functions - Management systems (CAS) * Check--measureanalyze & evaluate...

  8. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education ...

  9. Soboba Strategic Tribal Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    all tribal members past, present, and future. - Clean Water ... - The Final Strategic Energy Planning document ... work on an approved 12 month project implementation plan. ...

  10. NUGEX 2014 Meeting Planning Subcommittee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Meeting Planning Subcommittee NUGEX 2014 Meeting Planning Subcommittee Members Frank Tsung, UCLA (HEPFES) Gary Grest, Sandia (BES) Last edited: 2013-06-03 11:04:4...

  11. Realistic Financial Planning and Rapid

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Realistic Financial Planning and Rapid Modification to Project Execution are Essential ... Ignition Facility Title: Realistic Financial Planning and Rapid Modification to ...

  12. Status and Planned Experiments of the Hiradmat Pulsed Beam Material...

    Office of Scientific and Technical Information (OSTI)

    beams to an irradiation area where material samples as well as accelerator component assemblies (e.g. vacuum windows, shock tests on high power targets, collimators) can be tested. ...

  13. ARM Cloud Aerosol Precipitation Experiment (ACAPEX) Science Plan

    SciTech Connect (OSTI)

    Leung, L. R.; Prather, K.; Ralph, R.; Rosenfeld, D.; Spackman, R.; DeMott, P.; Fairall, C.; Fan, J.; Hagos, S.; Hughes, M.; Long, C.; Rutledge, S.; Waliser, D.; Wang, H.

    2014-09-01

    The western U.S. receives precipitation predominantly during the cold season when storms approach from the Pacific Ocean. The snowpack that accumulates during winter storms provides about 70-90% of water supply for the region. Understanding and modeling the fundamental processes that govern the large precipitation variability and extremes in the western U.S. is a critical test for the ability of climate models to predict the regional water cycle, including floods and droughts. Two elements of significant importance in predicting precipitation variability in the western U.S. are atmospheric rivers and aerosols. Atmospheric rivers (ARs) are narrow bands of enhanced water vapor associated with the warm sector of extratropical cyclones over the Pacific and Atlantic oceans. Because of the large lower-tropospheric water vapor content, strong atmospheric winds and neutral moist static stability, some ARs can produce heavy precipitation by orographic enhancement during landfall on the U.S. West Coast. While ARs are responsible for a large fraction of heavy precipitation in that region during winter, much of the rest of the orographic precipitation occurs in post-frontal clouds, which are typically quite shallow, with tops just high enough to pass the mountain barrier. Such clouds are inherently quite susceptible to aerosol effects on both warm rain and ice precipitation-forming processes.

  14. ARM West Antarctic Radiation Experiment (AWARE) Science Plan

    SciTech Connect (OSTI)

    Lubin, D; Bromwich, DH; Russell, LM; Verlinde, J; Vogelmann, AM

    2015-10-01

    West Antarctica is one of the most rapidly warming regions on Earth, and this warming is closely connected with global sea level rise. The discovery of rapid climate change on the West Antarctic Ice Sheet (WAIS) has challenged previous explanations of Antarctic climate change that focused on strengthening of circumpolar westerlies in response to the positive polarity trend in the Southern Annular Mode. West Antarctic warming does not yet have a comprehensive explanation: dynamical mechanisms may vary from one season to the next, and these mechanisms very likely involve complex teleconnections with subtropical and tropical latitudes. The prime motivation for this proposal is that there has been no substantial atmospheric science or climatological field work on West Antarctica since the 1957 International Geophysical Year and that research continued for only a few years. Direct meteorological information on the WAIS has been limited to a few automatic weather stations for several decades, yet satellite imagery and meteorological reanalyses indicate that West Antarctica is highly susceptible to advection of warm and moist maritime air with related cloud cover, depending on the location and strength of low pressure cells in the Amundsen, Ross, and Bellingshausen Seas. There is a need to quantify the role of these changing air masses on the surface energy balance, including all surface energy components and cloud-radiative forcing. More generally, global climate model simulations are known to perform poorly over the Antarctic and Southern Oceans, and the marked scarcity of cloud information at southern high latitudes has so far inhibited significant progress. Fortunately, McMurdo Station, where the Atmospheric Radiation Measurement Facility’s (ARM’s) most advanced cloud and aerosol instrumentation is situated, has a meteorological relationship with the WAIS via circulation patterns in the Ross and Amundsen Seas. We can therefore gather sophisticated data with cloud radars and high spectral resolution lidar and a complete aerosol suite at McMurdo that have relevance to the WAIS as well. At the same time, we will send basic radiometric, surface energy balance, and upper air equipment directly to the WAIS to make the first well calibrated climatological suite of measurements seen in this extremely remote but globally critical region in more than 40 years.

  15. ARM West Antarctic Radiation Experiment (AWARE) Science Plan...

    Office of Scientific and Technical Information (OSTI)

    The prime motivation for this proposal is that there has ... WAIS as well. At the same time, we will send basic ... Authors: Lubin, D 1 ; Bromwich, DH 2 ; Russell, LM 3 ; ...

  16. ARM Cloud Aerosol Precipitation Experiment (ACAPEX) Science Plan...

    Office of Scientific and Technical Information (OSTI)

    Because of the large lower-tropospheric water vapor content, strong atmospheric winds and neutral moist static stability, some ARs can produce heavy precipitation by orographic ...

  17. Federal Building Metering Implementation Plan Template | Department...

    Office of Environmental Management (EM)

    Implementation Plan Template Federal Building Metering Implementation Plan Template Document provides a template for a federal building metering implementation plan....

  18. WIPP - Passive Institutional Controls (PICs) Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plans Files below are in PDF format and can be viewed with Adobe Acrobat Reader. PICs Implementation Plan Permanent Markers Implementation Plan Permanent Markers Testing Plan

  19. Appendix K Disposal Cell Groundwater Monitoring Plan

    Office of Legacy Management (LM)

    K Disposal Cell Groundwater Monitoring Plan

  20. Strategic Energy Planning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Resources Strategic Energy Planning Resources Below are resources for Tribes on strategic energy planning. Learn more about strategic energy planning. ...

  1. Creating Sample Plans

    Energy Science and Technology Software Center (OSTI)

    1999-03-24

    The program has been designed to increase the accuracy and reduce the preparation time for completing sampling plans. It consists of our files 1. Analyte/Combination (AnalCombo) A list of analytes and combinations of analytes that can be requested of the onsite and offsite labs. Whenever a specific combination of analytes or suite names appear on the same line as the code number, this indicates that one sample can be placed in one bottle to bemore » analyzed for these paremeters. A code number is assigned for each analyte and combination of analytes. 2. Sampling Plans Database (SPDb) A database that contains all of the analytes and combinations of analytes along with the basic information required for preparing a sample plan. That basic information includes the following fields; matrix, hold time, preservation, sample volume, container size, if the bottle caps are taped, acceptable choices. 3. Sampling plans create (SPcreate) a file that will lookup information from the Sampling Plans Database and the Job Log File (JLF98) A major database used by Sample Managemnet Services for recording more than 100 fields of information.« less

  2. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  3. Current Schedule of Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    current schedule of experiments Current Schedule of Experiments Current Schedule of Experiments - Updated 4/2016

  4. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  5. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  6. LANS DB PENSION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANS Contract LANS Contract Information Management and Operating Contract for the Los Alamos National Laboratory For confirmation of Official Contract Provisions, call: Dan Saiz, Contract Specialist, M&O Contract Support Division at (505) 845-4024. Get Adobe Reader You will need Adobe Acrobat to read many of the files on this site. If you haven't already done so, please download the free Adobe Reader

    December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS

  7. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  8. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  9. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  10. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  11. Performance expectation plan

    SciTech Connect (OSTI)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  12. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  13. Recent Results and Future Plans for a 45 Actuator Adaptive X...

    Office of Scientific and Technical Information (OSTI)

    Optics Experiment at the Advanced Light Source Citation Details In-Document Search Title: Recent Results and Future Plans for a 45 Actuator Adaptive X-ray Optics Experiment at the ...

  14. Mescalero Apache Strategic Energy Plan

    Broader source: Energy.gov [DOE]

    Example of a tribal community strategic energy plan developed by the Mescalero Apache. Source: Kabotie Consulting.

  15. WRAP Module 1 waste characterization plan

    SciTech Connect (OSTI)

    Mayancsik, B.A.

    1995-01-23

    The purpose of this document is to present the characterization methodology for waste generated, processed, or otherwise the responsibility of the Waste Receiving and Processing (WRAP) Module 1 facility. The scope of this document includes all solid low level waste (LLW), transuranic (TRU), mixed waste (MW), and dangerous waste. This document is not meant to be all-inclusive of the waste processed or generated within WRAP Module 1, but to present a methodology for characterization. As other streams are identified, the method of characterization will be consistent with the other streams identified in this plan. The WRAP Module 1 facility is located in the 200 West Area of the Hanford Site. The facility`s function is two-fold. The first is to verify/characterize, treat and repackage contact handled (CH) waste currently in retrievable storage in the LLW Burial Grounds, Hanford Central Waste Complex, and the Transuranic Storage and Assay Facility (TRUSAF). The second is to verify newly generated CH TRU waste and LLW, including MW. The WRAP Module 1 facility provides NDE and NDA of the waste for both drums and boxes. The NDE is used to identify the physical contents of the waste containers to support waste characterization and processing, verification, or certification. The NDA results determine the radioactive content and distribution of the waste.

  16. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  17. Program Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications » Program Plans Program Plans This page contains summaries of planned activities for DOE's Fuel Cell Technologies Office. The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Office and the DOE offices of Nuclear Energy, Fossil Energy, and Science. It describes the Program's activities, the specific

  18. Multiwell experiment

    SciTech Connect (OSTI)

    Sattler, A.R.; Warpinski, N.R.; Lorenz, J.C.; Hart, C.M.; Branagan, P.T.

    1985-01-01

    The Multiwell Experiment is a research-oriented field laboratory. Its overall objectives are to characterize lenticular, low-permeability gas reservoirs and to develop technology for their production. This field laboratory has been established at a site in the east-central Piceance basin, Colorado. Here the Mesaverde formation lies at a depth of 4000 to 8250 ft. This interval contains different, distinct reservoir types depending upon their depositional environments. These different zones serve as the focus of the various testing and stimulation programs. Field work began in late 1981 and is scheduled through mid-1988. One key to the Multiwell Experiment is three closely spaced wells. Core, log, well testing, and well-to-well seismic data are providing a far better definition of the geological setting than has been available previously. The closely spaced wells also allow interference and tracer tests to obtain in situ reservoir parameters. The vertical variation of in situ stress throughout the intervals of interest is being measured. A series of stimulation experiments is being conducted in one well and the other two wells are being used as observation wells for improved fracture diagnostics and well testing. Another key to achieving the Multiwell Experiment objectives is the synergism resulting from a broad spectrum of activities: geophysical surveys, sedimentological studies, core and log analyses, well testing, in situ stress determination, stimulation, fracture diagnostics, and reservoir analyses. The results from the various activities will define the reservoir and the hydraulic fracture. These, in turn, define the net pay stimulated: the intersection of a hydraulic fracture of known geometry with a reservoir of known morphology and properties. Accomplishments of the past year are listed. 4 refs.

  19. SANE experiment

    SciTech Connect (OSTI)

    H. Baghdasaryan, SANE Collaboration

    2012-04-01

    The Spin Asymmetries of the Nucleon Experiment (SANE) is a measurement of parallel and near-perpendicular double spin asymmetries in an inclusive electron scattering. The main goal of the experiment was to measure A{sub {parallel}} and A{sub 80} and extract the spin asymmetries of the proton A{sub 1}{sup p}, A{sub 2}{sup p} and spin structure functions g{sub 1}{sup p} and g{sub 2}{sup p}. Using the Thomas Jefferson National Accelerator Facility's polarized electron beam and the University of Virginia's polarized frozen ammonia ({sup 14}NH{sub 3}) target in Hall C, the experiment ran in 2009, collecting data in a Q{sup 2} region from 2.5 to 6.5 GeV{sup 2} and between Bjorken x of 0.3 to 0.8. Particle detection was accomplished using the Big Electron Telescope Array (BETA), a novel non-magnetic detector. This talk will address the progress of the analysis designed to extract the proton spin asymmetries and structure functions. Preliminary results will be presented.

  20. Comprehensive facilities plan

    SciTech Connect (OSTI)

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.