National Library of Energy BETA

Sample records for retrievals experiment planning

  1. Transuranic (TRU) Waste Phase I Retrieval Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    1999-08-27

    Phase I retrieval of post-1970 TRU wastes from burial ground 218-W-4C can be done in a safe, efficient, and cost-effective manner. Initiating TRU retrieval by retrieving uncovered drums from Trenches 1, 20, and 29, will allow retrieval to begin under the current SWBG safety authorization basis. The retrieval of buried drums from Trenches 1, 4, 20, and 29, which will require excavation, will commence once the uncovered drum are retrieved. This phased approach allows safety analysis for drum venting and drum module excavation to be completed and approved before the excavation proceeds. In addition, the lessons learned and the operational experience gained from the retrieval of uncovered drums can be applied to the more complicated retrieval of the buried drums. Precedents that have been set at SRS and LANL to perform retrieval without a trench cover, in the open air, should be followed. Open-air retrieval will result in significant cost savings over the original plans for Phase I retrieval (Project W-113). Based on LANL and SRS experience, open-air retrieval will have no adverse impacts to the environment or to the health and safety of workers or the public. Assaying the waste in the SWBG using a mobile assay system, will result in additional cost savings. It is expected that up to 50% of the suspect-TRU wastes will assay as LLW, allowing those waste to remain disposed of in the SWBG. Further processing, with its associated costs, will only occur to the portion of the waste that is verified to be TRU. Retrieval should be done, to the extent possible, under the current SWBG safety authorization basis as a normal part of SWBG operations. The use of existing personnel and existing procedures should be optimized. By working retrieval campaigns, typically during the slow months, it is easier to coordinate the availability of necessary operations personnel, and it is easier to coordinate the availability of a mobile assay vendor.

  2. Transuranic (TRU) Waste Phase I Retrieval Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-09-28

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval scenario similar to those used for TRU drum retrieval at LANL and SRS. Phase I retrieval consists of the activities associated with the assessment of approximately 10,000 55-gallon drums of suspect TRU-waste in burial ground 218-W-4C and the retrieval of those drums verified to contain TRU waste. Four of the trenches in 218-W-4C (Trenches 1, 4, 20, and 29) are prime candidates for Phase I retrieval because they contain large numbers of suspect TRU drums, stacked from 2 to 5 drums high, on an asphalt pad. In fact, three of the trenches (Trenches 1 , 20, and 29) contain waste that has not been covered with soil, and about 1500 drums can be retrieved without excavation. The other three trenches in 218-W-4C (Trenches 7, 19, and 24) are not candidates for Phase I retrieval because they contain significant numbers of boxes. Drums will be retrieved from the four candidate trenches, checked for structural integrity, overpacked, if necessary, and assayed at the burial

  3. Single Shell Tank (SST) Retrieval Project Plan for Tank 241-C-104 Retrieval

    SciTech Connect (OSTI)

    DEFIGH PRICE, C.

    2000-09-20

    In support of the SST Interim Closure Project, Project W-523 ''Tank 241-C-104 Waste Retrieval System'' will provide systems for retrieval and transfer of radioactive waste from tank 241-C-104 (C-104) to the DST staging tank 241-AY-101 (AY-101). At the conclusion of Project W-523, a retrieval system will have been designed and tested to meet the requirements for Acceptance of Beneficial Use and been turned over to operations. Completion of construction and operations of the C-104 retrieval system will meet the recently proposed near-term Tri-Party Agreement milestone, M-45-03F (Proposed Tri-Party Agreement change request M-45-00-01A, August, 30 2000) for demonstrating limits of retrieval technologies on sludge and hard heels in SSTs, reduce near-term storage risks associated with aging SSTs, and provide feed for the tank waste treatment plant. This Project Plan documents the methodology for managing Project W-523; formalizes responsibilities; identifies key interfaces required to complete the retrieval action; establishes the technical, cost, and schedule baselines; and identifies project organizational requirements pertaining to the engineering process such as environmental, safety, quality assurance, change control, design verification, testing, and operational turnover.

  4. Tank waste remediation system tank waste retrieval risk management plan

    SciTech Connect (OSTI)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  5. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    SciTech Connect (OSTI)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D; Falter, Diedre D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. This review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.

  6. OSTI highlights "AEC Information Retrieval Experiment" | OSTI...

    Office of Scientific and Technical Information (OSTI)

    OSTI has featured the AEC experiment at its DOE R&D Accomplishments Web site. DOE R&D Accomplishments is a central forum for information about the outcomes of past DOE R&D that ...

  7. Tank waste remediation system retrieval and disposal mission waste feed delivery plan

    SciTech Connect (OSTI)

    Potter, R.D.

    1998-01-08

    This document is a plan presenting the objectives, organization, and management and technical approaches for the Waste Feed Delivery (WFD) Program. This WFD Plan focuses on the Tank Waste Remediation System (TWRS) Project`s Waste Retrieval and Disposal Mission.

  8. Hanford contact-handled transuranic drum retrieval project planning document

    SciTech Connect (OSTI)

    DEMITER, J.A.

    1998-11-17

    The Hanford Site is one of several US Department of Energy (DOE) sites throughout the US that has generated and stored transuranic (TRU) wastes. The wastes were primarily placed in 55-gallon drums, stacked in trenches, and covered with soil. In 1970, the Nuclear Regulatory Commission ordered that TRU wastes be segregated from other radioactive wastes and placed in retrievable storage until such time that the waste could be sent to a geologic repository and permanently disposed. Retrievable storage also defined container storage life by specifying that a container must be retrievable as a contamination-free container for 20 years. Hanford stored approximately 37,400 TRU containers in 20-year retrievable storage from 1970 to 1988. The Hanford TRU wastes placed in 20-year retrievable storage are considered disposed under existing Resource Conservation and Recovery Act (RCRA) regulations since they were placed in storage prior to September 1988. The majority of containers were 55-gallon drums, but 20-year retrievable storage includes several TRU wastes covered with soil in different storage methods.

  9. Tank 241-C-106 waste retrieval sluicing system process control plan

    SciTech Connect (OSTI)

    Carothers, K.G.

    1998-07-25

    Project W-320 has installed the Waste Retrieval Sluicing System at the 200 East Area on the Hanford Site to retrieve the sludge from single-shell tank 241-C-106 and transfer it into double-shell tank 241-AY-102. Operation of the WRSS process will resolve the high-heat safety issue for tank 241-C-106 and demonstrate a technology for the retrieval of single-shell tank wastes. This process control plan coordinates the technical operating requirements (primarily mass transfer, temperature, and flammable gas) for the sluicing operation and provides overall technical guidance for the retrieval activity.

  10. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect (OSTI)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  11. Tank Waste Remediation System (TWRS) Retrieval Authorization Basis Amendment Task Plan

    SciTech Connect (OSTI)

    HARRIS, J.P.

    1999-08-31

    This task plan is a documented agreement between Nuclear Safety and Licensing and Retrieval Engineering. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Delivery Program, Project W-211, Project W-521, and Project W-522.

  12. Tank Waste Remediation System (TWRS) Retrieval Authorization Basis Amendment Task Plan

    SciTech Connect (OSTI)

    HARRIS, J.P.

    2000-03-27

    This task plan is a documented agreement between Nuclear Safety and Licensing and Retrieval Engineering. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Delivery Program, Project W-211, Project W-521, and Project W-522.

  13. Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary

    SciTech Connect (OSTI)

    1987-03-01

    This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

  14. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-04-19

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.

  15. Safety plan for the cooperative telerobotic retrieval system equipment development area

    SciTech Connect (OSTI)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  16. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    SciTech Connect (OSTI)

    BUSSELL, J.H.

    1999-08-02

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K compliance for Project W-151, Tank 101-AZ Waste Retrieval System. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. Two mixer pumps and instrumentation have been or are planned to be installed in waste tank 101-AZ to demonstrate solids mobilization. The information and experience gained during this process test will provide data for comparison with sludge mobilization prediction models and provide indication of the effects of mixer pump operation on an Aging Waste Facility tank. A limited description of system dates, functions, interfaces, potential Y2K problems, and date resolutions is presented. The project is presently on hold, and definitive design and procurement have been completed. This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems.

  17. TWRS retrieval and storage mission, immobilized low-activity waste disposal plan

    SciTech Connect (OSTI)

    Shade, J.W.

    1998-01-07

    The TWRS mission is to store, treat, and immobilize highly radioactive Hanford waste (current and future tank waste and the encapsulated cesium and strontium) in a safe, environmentally sound, and cost-effective manner (TWRS JMN Justification for mission need). The mission includes retrieval, pretreatment, immobilization, interim storage and disposal, and tank closure. As part of this mission, DOE has established the TWRS Office to manage all Hanford Site tank waste activities. The TWRS program has identified the need to store, treat, immobilize, and dispose of the highly radioactive Hanford Site tank waste and encapsulated cesium and strontium materials in an environmentally sound, safe, and cost-effective manner. To support environmental remediation and restoration at the Hanford Site a two-phase approach to using private contractors to treat and immobilize the low-activity and high-level waste currently stored in underground tanks is planned. The request for proposals (RFP) for the first phase of waste treatment and immobilization was issued in February 1996 (Wagoner 1996) and initial contracts for two private contractor teams led by British Nuclear Fuels Ltd. and Lockheed-Martin Advanced Environmental Services were signed in September 1996. Phase 1 is a proof-of-concept and commercial demonstration effort to demonstrate the technical and business feasibility of using private facilities to treat Hanford Site waste, maintain radiological, nuclear, process, and occupational safety; and maintain environmental protection and compliance while reducing lifecycle costs and waste treatment times. Phase 1 production of ILAW is planned to begin in June 2002 and could treat up to about 13 percent of the waste. Phase 1 production is expected to be completed in 2007 for minimum order quantities or 2011 for maximum order quantities. Phase 2 is a full-scale production effort that will begin after Phase 1 and treat and immobilize most of the waste. Phase 2 production is

  18. ARM West Antarctic Radiation Experiment (AWARE) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 ARM West Antarctic Radiation Experiment (AWARE) Science Plan D Lubin J Verlinde DH ... DOESC-ARM-15-040 ARM West Antarctic Radiation Experiment (AWARE) Science Plan D Lubin J ...

  19. Experiment Science Plan D Turner D Parsons B Geerts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plains Elevated Convection at Night (PECAN) Experiment Science Plan D Turner D Parsons B ... DOESC-ARM-14-035 Plains Elevated Convection at Night (PECAN) Experiment Science Plan ...

  20. TWRS retrieval and disposal mission, immobilized high-level waste storage plan

    SciTech Connect (OSTI)

    Calmus, R.B.

    1998-01-07

    This project plan has a two fold purpose. First, it provides a plan specific to the Hanford Tank Waste Remediation System (TWRS) Immobilized High-Level Waste (EMW) Storage Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestone M-90-01 (Ecology et al. 1996) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan. Second, it provides an upper tier document that can be used as the basis for future subproject line item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 (DOE 1992a) and 430.1 (DOE 1995)). The format and content of this project plan are designed to accommodate the plan`s dual purpose. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.

  1. TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan

    SciTech Connect (OSTI)

    BURBANK, D.A.

    1999-09-01

    This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as the basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.

  2. Planning for an integrated research experiment

    SciTech Connect (OSTI)

    Barnard, J.J.; Ahle, L.E.; Bangerter, R.O.; Bieniosek, F.M.; Celata, C.M.; Faltens, A.; Friedman, A.; Grote, D.P.; Haber, I.; Henestroza, E.; Kishek, R.A.; de Hoon, M.J.L.; Karpenko, V.P.; Kirhek, R.A.; Kwan, J.W.; Lee, E.P.; Logan, B.G.; Lund, S.M.; Meier, W.R.; Molvik, A.W.; Sangster, T.C.; Seidl, P.A.; Sharp, W.M.

    2001-03-25

    We describe the goals and research program leading to the Heavy Ion Integrated Research Experiment (IRE). We review the basic constraints which lead to a design and give examples of parameters and capabilities of an IRE. We also show design tradeoffs generated by the systems code IBEAM.

  3. Tank waste remediation system retrieval and disposal mission authorization basis amendment task plan

    SciTech Connect (OSTI)

    Goetz, T.G.

    1998-01-08

    This task plan is a documented agreement between Nuclear Safety and Licensing and the Process Development group within the Waste Feed Delivery organization. The purpose of this task plan is to identify the scope of work, tasks and deliverables, responsibilities, manpower, and schedules associated with an authorization basis amendment as a result of the Waste Feed Waste Delivery Program, Project W-211, and Project W-TBD.

  4. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect (OSTI)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  5. Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan

    Office of Scientific and Technical Information (OSTI)

    (Program Document) | SciTech Connect Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan Citation Details In-Document Search Title: Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan Clouds over the Southern Ocean are poorly represented in present day reanalysis products and global climate model simulations. Errors in top-of-atmosphere (TOA) broadband radiative fluxes in this region are among the largest globally, with large implications for modeling both

  6. Planning for an Integrated Research Experiment

    SciTech Connect (OSTI)

    Barnard, J.J.; Ahle, L.E.; Bangerter, R.O.; Bieniosek, F.M.; Celata, C.M.; Faltens, A.; Friedman, A.; Grote, D.P.; Haber, I.; Henestroza, E.; Kishek, R.A.; de Hoon, M.J.L.; Karpenko, V.P.; Kwan, J.W.; Lee, E.P.; Logan, B.G.; Lund, S.M.; Meier, W.R.; Molvik, A.W.; Sangster, T.C.; Seidl, P.A.; Sharp, W.M.

    2000-09-15

    The authors describe the goals and research program leading to the Heavy Ion Integrated Research Experiment (IRE). They review the basic constraints which lead to a design and give examples of parameters and capabilities of an IRE. We also show design tradeoffs generated by the systems code IBEAM. A multi-pronged Phase 1 research effort is laying the groundwork for the Integrated Research Experiment. Experiment, technology development, theory, simulation, and systems studies are all playing major roles in this Phase I research. The key research areas are: (1) Source and injector (for investigation of a high brightness, multiple beam, low cost injector); (2) High current transport (to examine effects at full driver-scale line charge density, including the maximization of the beam filling-factor and control of electrons); (3) Enabling technology development (low cost and high performance magnetic core material, superconducting magnetic quadrupole arrays, insulators, and pulsers); and (4) Beam simulations and theory (for investigations of beam matching, specification of accelerator errors, studies of emittance growth, halo, and bunch compression, in the accelerator, and neutralization methods, stripping effects, spot size minimization in the chamber); and (5) Systems optimization (minimization of cost and maximization of pulse energy and beam intensity). They have begun the process of designing, simulating, and optimizing the next major heavy-ion induction accelerator, the IRE. This accelerator facility will, in turn, help provide the basis to proceed to the next step in the development of IFE as an attractive source of fusion energy.

  7. Evolving treatment plan quality criteria from institution-specific experience

    SciTech Connect (OSTI)

    Ruan, D.; Shao, W.; DeMarco, J.; Tenn, S.; King, C.; Low, D.; Kupelian, P.; Steinberg, M.

    2012-05-15

    Purpose: The dosimetric aspects of radiation therapy treatment plan quality are usually evaluated and reported with dose volume histogram (DVH) endpoints. For clinical practicality, a small number of representative quantities derived from the DVH are often used as dose endpoints to summarize the plan quality. National guidelines on reference values for such quantities for some standard treatment approaches are often used as acceptance criteria to trigger treatment plan review. On the other hand, treatment prescription and planning approaches specific to each institution warrants the need to report plan quality in terms of practice consistency and with respect to institution-specific experience. The purpose of this study is to investigate and develop a systematic approach to record and characterize the institution-specific plan experience and use such information to guide the design of plan quality criteria. In the clinical setting, this approach will assist in (1) improving overall plan quality and consistency and (2) detecting abnormal plan behavior for retrospective analysis. Methods: The authors propose a self-evolving methodology and have developed an in-house prototype software suite that (1) extracts the dose endpoints from a treatment plan and evaluates them against both national standard and institution-specific criteria and (2) evolves the statistics for the dose endpoints and updates institution-specific criteria. Results: The validity of the proposed methodology was demonstrated with a database of prostate stereotactic body radiotherapy cases. As more data sets are accumulated, the evolving institution-specific criteria can serve as a reliable and stable consistency measure for plan quality and reveals the potential use of the ''tighter'' criteria than national standards or projected criteria, leading to practice that may push to shrink the gap between plans deemed acceptable and the underlying unknown optimality. Conclusions: The authors have developed

  8. Project specific quality assurance plan, W-151, Tank 241-AZ-101 waste retrieval system. Revision 2

    SciTech Connect (OSTI)

    Manthei, M.E.

    1994-11-21

    This project specific quality assurance program plan establishes the responsibility for the implementation of QA requirements, defines and documents the QA requirements associated with design, procurement, and construction, and defines and documents the degree of QA reviews and verifications on the design and construction necessary to assure compliance to project and DOE requirements. Revision 2 updates the QAPP to provide concurrence with approved work scope deletion. In addition, the Quality Assurance Program Index is being updated to reflect the current Quality Assurance Program requirements per DOE Order 5700.6C.

  9. The Sao Paulo Microtron: Equipment and Planned Experiments

    SciTech Connect (OSTI)

    Martins, M. N.; Maidana, N. L.; Vanin, V. R.

    2007-10-26

    The Linear Accelerator Laboratory (LAL) of the Instituto de Fisica da Universidade de Sao Paulo (IFUSP) is building a two-stage racetrack microtron, which will generate continuous wave electron beams with energies up to 38 MeV. This paper describes the characteristics of the accelerator, and reports on the experimental equipment that will be available in order to pursue the photonuclear physics research program. Operation will begin with the first stage (5 MeV), and concentrate on NRF (Nuclear Resonance Fluorescence) measurements and radiation physics studies. Planned experiments for the second stage explore the cw character of the beam on coincidence experiments. A photon tagger has been already tested with radioactive sources and is ready to be installed. Gamma and neutron detector arrays are being developed for the detailed study of photoneutron reactions. Plans include the study of NRF and pygmy resonances, near the neutron binding energy.

  10. Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    82 Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan RT Marchand SP Alexander A Protat December 2015 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

  11. Experiment operations plan for the TH-2 experiment in the NRU reactor. [PWR; BWR

    SciTech Connect (OSTI)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for TH-2--the second experiment in the series of thermal-hydraulic tests conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. The major objective of TH-2 was to develop the experiment reflood control parameters and the procedures to be used in subsequent experiments in this program. In this experiment, the data acquisition and control system was used to control the fuel cladding temperature during a simulated LOCA by using variable reflood coolant flow.

  12. Experiment operations plan for the MT-4 experiment in the NRU reactor. [PWR

    SciTech Connect (OSTI)

    Russcher, G.E.; Wilson, C.L.; Parchen, L.J.; Marshall, R.K.; Hesson, G.M.; Webb, B.J.; Freshley, M.D.

    1983-06-01

    A series of thermal-hydraulic and cladding materials deformation experiments were conducted using light-water reactor fuel bundles as part of the Pacific Northwest Laboratory Loss-of-Coolant Accident (LOCA) Simulation Program. This report is the formal operations plan for MT-4 - the fourth materials deformation experiment conducted in the National Research Universal (NRU) reactor, Chalk River, Ontario, Canada. A major objective of MT-4 was to simulate a pressurized water reactor LOCA that could induce fuel rod cladding deformation and rupture due to a short-term adiabatic transient and a peak fuel cladding temperature of 1200K (1700/sup 0/F).

  13. Planning the Next Generation of Arctic Ecosystem Experiments

    SciTech Connect (OSTI)

    Hinzman, Larry D [International Arctic Research Center; Wilson, Cathy [Los Alamos National Laboratory (LANL)

    2011-01-01

    Climate Change Experiments in High-Latitude Ecosystems; Fairbanks, Alaska, 13-14 October 2010; A 2-day climate change workshop was held at the International Arctic Research Center, University of Alaska Fairbanks. The workshop, sponsored by Biological and Environmental Research, Office of Science, U.S. Department of Energy (DOE), was attended by 45 subject matter experts from universities, DOE national laboratories, and other federal and nongovernmental organizations. The workshop sought to engage the Arctic science community in planning for a proposed Next-Generation Ecosystem Experiments (NGEE-Arctic) project in Alaska (http:// ngee.ornl.gov/). The goal of this activity is to provide data, theory, and models to improve representations of high-latitude terrestrial processes in Earth system models. In particular, there is a need to better understand the processes by which warming may drive increased plant productivity and atmospheric carbon uptake and storage in biomass and soils, as well as those processes that may drive an increase in the release of methane (CH{sub 4}) and carbon dioxide (CO{sub 2}) through microbial decomposition of soil carbon stored in thawing permafrost. This understanding is required to quantify the important feedback mechanisms that define the role of terrestrial processes in regional and global climate.

  14. Combined Retrieval, Microphysical Retrievals and Heating Rates

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Feng, Zhe

    2013-02-22

    Microphysical retrievals and heating rates from the AMIE/Gan deployment using the PNNL Combined Retrieval.

  15. Combined Retrieval, Microphysical Retrievals and Heating Rates

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Feng, Zhe

    Microphysical retrievals and heating rates from the AMIE/Gan deployment using the PNNL Combined Retrieval.

  16. ARM-99-005 Science and Experiment Plan Spring 1999 Flight Series

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM - UAV Atmospheric Radiation Measurement - Unmanned Aerospace Vehicle Science and Experiment Plan Spring 1999 Flight Series Robert Ellingson and Tim Tooman, eds. Version 1.2 - ...

  17. MRS Action Plan Task B report: Analyses of alternative designs and operating approaches for a Monitored Retrievable Storage Facility

    SciTech Connect (OSTI)

    Woods, W.D.; Jowdy, A.K.; Keehn, C.H.; Gale, R.M.; Smith, R.I.

    1988-12-01

    The Nuclear Waste Policy Amendments Act (NWPAA) instituted a number of changes in the DOE commercial nuclear waste management system. After passage of the Act, the DOE initiated a number of systems studies to reevaluate the role of Monitored Retrievable Storage (MRS) within the federal waste management system. This report summarizes the results of a study to determine the schedules and costs of developing those MRS facilities needed under a number of scenarios, with differing functions allocated to the MRS and/or different spent fuel acceptance schedules. Nine cases were defined for the system study, seven of which included an MRS Facility. The study cases or scenarios evaluated varied relative to the specific functions to be performed at the MRS. The scenarios ranged in magnitude from storage and shipment of bare, intact spent fuel to consolidating the spent fuel into repository emplacement containers prior to storage and shipment. Each scenario required specific modifications to be made to the design developed for the MRS proposal to Congress (the Conceptual Design Report). 41 figs., 326 tabs.

  18. Ganges Valley Aerosol Experiment: Science and Operations Plan

    SciTech Connect (OSTI)

    Kotamarthi, VR

    2010-06-21

    The Ganges Valley region is one of the largest and most rapidly developing sections of the Indian subcontinent. The Ganges River, which provides the region with water needed for sustaining life, is fed primarily by snow and rainfall associated with Indian summer monsoons. Impacts of changes in precipitation patterns, temperature, and the flow of the snow-fed rivers can be immense. Recent satellite-based measurements have indicated that the upper Ganges Valley has some of the highest persistently observed aerosol optical depth values. The aerosol layer covers a vast region, extending across the Indo-Gangetic Plain to the Bay of Bengal during the winter and early spring of each year. The persistent winter fog in the region is already a cause of much concern, and several studies have been proposed to understand the economic, scientific, and societal dimensions of this problem. During the INDian Ocean EXperiment (INDOEX) field studies, aerosols from this region were shown to affect cloud formation and monsoon activity over the Indian Ocean. This is one of the few regions showing a trend toward increasing surface dimming and enhanced mid-tropospheric warming. Increasing air pollution over this region could modify the radiative balance through direct, indirect, and semi-indirect effects associated with aerosols. The consequences of aerosols and associated pollution for surface insolation over the Ganges Valley and monsoons, in particular, are not well understood. The proposed field study is designed for use of (1) the ARM Mobile Facility (AMF) to measure relevant radiative, cloud, convection, and aerosol optical characteristics over mainland India during an extended period of 912 months and (2) the G-1 aircraft and surface sites to measure relevant aerosol chemical, physical, and optical characteristics in the Ganges Valley during a period of 612 weeks. The aerosols in this region have complex sources, including burning of coal, biomass, and biofuels; automobile

  19. Macquarie Island Cloud and Radiation Experiment (MICRE) Science Plan

    SciTech Connect (OSTI)

    Marchand, RT; Protat, A; Alexander, SP

    2015-12-01

    Clouds over the Southern Ocean are poorly represented in present day reanalysis products and global climate model simulations. Errors in top-of-atmosphere (TOA) broadband radiative fluxes in this region are among the largest globally, with large implications for modeling both regional and global scale climate responses (e.g., Trenberth and Fasullo 2010, Ceppi et al. 2012). Recent analyses of model simulations suggest that model radiative errors in the Southern Ocean are due to a lack of low-level postfrontal clouds (including clouds well behind the front) and perhaps a lack of supercooled liquid water that contribute most to the model biases (Bodas-Salcedo et al. 2013, Huang et al. 2014). These assessments of model performance, as well as our knowledge of cloud and aerosol properties over the Southern Ocean, rely heavily on satellite data sets. Satellite data sets are incomplete in that the observations are not continuous (i.e., they are acquired only when the satellite passes nearby), generally do not sample the diurnal cycle, and view primarily the tops of cloud systems (especially for the passive instruments). This is especially problematic for retrievals of aerosol, low-cloud properties, and layers of supercooled water embedded within (rather than at the top of) clouds, as well as estimates of surface shortwave and longwave fluxes based on these properties.

  20. Password Retriever

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CAMD Home | Microfabrication Home Password Retriever Please, enter in your email address below and hit the Get Password button. Your UserID and password will be emailed to you ...

  1. Plains Elevated Convection at Night (PECAN) Experiment Science Plan

    SciTech Connect (OSTI)

    Turner, D; Parsons, D; Geerts, B

    2015-03-01

    The Plains Elevated Convection at Night (PECAN) experiment is a large field campaign that is being supported by the National Science Foundation (NSF) with contributions from the National Oceanic and Atmospheric Administration (NOAA), the National Atmospheric and Space Administration (NASA), and the U.S. Department of Energy (DOE). The overarching goal of the PECAN experiment is to improve the understanding and simulation of the processes that initiate and maintain convection and convective precipitation at night over the central portion of the Great Plains region of the United States (Parsons et al. 2013). These goals are important because (1) a large fraction of the yearly precipitation in the Great Plains comes from nocturnal convection, (2) nocturnal convection in the Great Plains is most often decoupled from the ground and, thus, is forced by other phenomena aloft (e.g., propagating bores, frontal boundaries, low-level jets [LLJ], etc.), (3) there is a relative lack of understanding how these disturbances initiate and maintain nocturnal convection, and (4) this lack of understanding greatly hampers the ability of numerical weather and climate models to simulate nocturnal convection well. This leads to significant uncertainties in predicting the onset, location, frequency, and intensity of convective cloud systems and associated weather hazards over the Great Plains.

  2. MTX (Microwave Tokamak Experiment) facility and machine grounding plan

    SciTech Connect (OSTI)

    Bell, H.H.; Rice, B.W.; Petersen, D.E.; Herrera, C.H.

    1987-10-07

    A key issue in the design of fusion research experiments and their related facilities is the control of ground currents. Because of the large magnetic field, high voltages and high currents present in most of these installations, it is essential to avoid ground loops, and to control ground currents during both normal operations and fault conditions. This paper describes the grounding policy that was developed for MTX. The vault area was divided into zones, and each of the four walls was treated as a separate grounding area. Cable runs and magnet buss bars were run into the machine radially. The paper also describes the steps taken to isolate diagnostic signals and power for pumps and instruments. The paper outlines some of the field calculations used to predict problem areas, and to reveal voltage isolation levels that were required. The paper includes the active ground fault detection system used to insure the integrity of the ground system. 2 refs., 5 figs.

  3. EM-21 Retrieval Knowledge Center: Waste Retrieval Challenges

    SciTech Connect (OSTI)

    Fellinger, Andrew P.; Rinker, Michael W.; Berglin, Eric J.; Minichan, Richard L.; Poirier, Micheal R.; Gauglitz, Phillip A.; Martin, Bruce A.; Hatchell, Brian K.; Saldivar, Eloy; Mullen, O Dennis; Chapman, Noel F.; Wells, Beric E.; Gibbons, Peter W.

    2009-04-10

    EM-21 is the Waste Processing Division of the Office of Engineering and Technology, within the U.S. Department of Energys (DOE) Office of Environmental Management (EM). In August of 2008, EM-21 began an initiative to develop a Retrieval Knowledge Center (RKC) to provide the DOE, high level waste retrieval operators, and technology developers with centralized and focused location to share knowledge and expertise that will be used to address retrieval challenges across the DOE complex. The RKC is also designed to facilitate information sharing across the DOE Waste Site Complex through workshops, and a searchable database of waste retrieval technology information. The database may be used to research effective technology approaches for specific retrieval tasks and to take advantage of the lessons learned from previous operations. It is also expected to be effective for remaining current with state-of-the-art of retrieval technologies and ongoing development within the DOE Complex. To encourage collaboration of DOE sites with waste retrieval issues, the RKC team is co-led by the Savannah River National Laboratory (SRNL) and the Pacific Northwest National Laboratory (PNNL). Two RKC workshops were held in the Fall of 2008. The purpose of these workshops was to define top level waste retrieval functional areas, exchange lessons learned, and develop a path forward to support a strategic business plan focused on technology needs for retrieval. The primary participants involved in these workshops included retrieval personnel and laboratory staff that are associated with Hanford and Savannah River Sites since the majority of remaining DOE waste tanks are located at these sites. This report summarizes and documents the results of the initial RKC workshops. Technology challenges identified from these workshops and presented here are expected to be a key component to defining future RKC-directed tasks designed to facilitate tank waste retrieval solutions.

  4. ARESE (ARM Enhanced Shortwave Experiment) Science Plan [Atmospheric Radiation Program

    SciTech Connect (OSTI)

    Valero, F.P.J.; Schwartz, S.E.; Cess, R.D.; Ramanathan, V.; Collins, W.D.; Minnis, P.; Ackerman, T.P.; Vitko, J.; Tooman, T.P.

    1995-09-27

    Several recent studies have indicated that cloudy atmospheres may absorb significantly more solar radiation than currently predicted by models. The magnitude of this excess atmospheric absorption, is about 50% more than currently predicted and would have major impact on our understanding of atmospheric heating. Incorporation of this excess heating into existing general circulation models also appears to ameliorate some significant shortcomings of these models, most notably a tendency to overpredict the amount of radiant energy going into the oceans and to underpredict the tropopause temperature. However, some earlier studies do not show this excess absorption and an underlying physical mechanism that would give rise to such absorption has yet to be defined. Given the importance of this issue, the Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) program is sponsoring the ARM Enhanced Shortwave Experiment (ARESE) to study the absorption of solar radiation by clear and cloudy atmospheres. The experimental results will be compared with model calculations. Measurements will be conducted using three aircraft platforms (ARM-UAV Egrett, NASA ER-2, and an instrumented Twin Otter), as well as satellites and the ARM central and extended facilities in North Central Oklahoma. The project will occur over a four week period beginning in late September, 1995. Spectral broadband, partial bandpass, and narrow bandpass (10nm) solar radiative fluxes will be measured at different altitudes and at the surface with the objective to determine directly the magnitude and spectral characteristics of the absorption of shortwave radiation by the atmosphere (clear and cloudy). Narrow spectral channels selected to coincide with absorption by liquid water and ice will help in identifying the process of absorption of radiation. Additionally, information such as water vapor profiles, aerosol optical depths, cloud structure and ozone profiles, needed to use as input in radiative

  5. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  6. Integrating impact assessment and conflict management in urban planning: Experiences from Finland

    SciTech Connect (OSTI)

    Peltonen, Lasse; Sairinen, Rauno

    2010-09-15

    The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impact assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.

  7. Retrieval Activities - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Farms Retrieval Activities Office of River Protection Tank Farms Retrieval Activities PHOENIX - Tank Monitoring Waste Treatment & Immobilization Plant 222-S Laboratory 242-A...

  8. Hanford Tank Waste Retrieval,

    Office of Environmental Management (EM)

    Tank Waste Retrieval, Treatment, and Disposition Framework September 24, 2013 U.S. Department of Energy Washington, D.C. 20585 Hanford Tank Waste Retrieval, Treatment, and ...

  9. Virtual LIDAR Model Helps Researchers Plan for Wake Steering Experiment at

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWiFT Model Helps Researchers Plan for Wake Steering Experiment at SWiFT - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear

  10. Virtual LIDAR model helps researchers plan for the Wake Steering Experiment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at SWiFT model helps researchers plan for the Wake Steering Experiment at SWiFT - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing

  11. NSR Key Number Retrieval

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NSR Key Number Retrieval Pease enter key in the box Submit

  12. Single-shell tank retrieval program mission analysis report

    SciTech Connect (OSTI)

    Stokes, W.J.

    1998-08-11

    This Mission Analysis Report was prepared to provide the foundation for the Single-Shell Tank (SST) Retrieval Program, a new program responsible for waste removal for the SSTS. The SST Retrieval Program is integrated with other Tank Waste Remediation System activities that provide the management, technical, and operations elements associated with planning and execution of SST and SST Farm retrieval and closure. This Mission Analysis Report provides the basis and strategy for developing a program plan for SST retrieval. This Mission Analysis Report responds to a US Department of Energy request for an alternative single-shell tank retrieval approach (Taylor 1997).

  13. STORMVEX: The Storm Peak Lab Cloud Property Validation Experiment Science and Operations Plan

    SciTech Connect (OSTI)

    Mace, J; Matrosov, S; Shupe, M; Lawson, P; Hallar, G; McCubbin, I; Marchand, R; Orr, B; Coulter, R; Sedlacek, A; Avallone, L; Long, C

    2010-09-29

    During the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX), a substantial correlative data set of remote sensing observations and direct in situ measurements from fixed and airborne platforms will be created in a winter season, mountainous environment. This will be accomplished by combining mountaintop observations at Storm Peak Laboratory and the airborne National Science Foundation-supported Colorado Airborne Multi-Phase Cloud Study campaign with collocated measurements from the second ARM Mobile Facility (AMF2). We describe in this document the operational plans and motivating science for this experiment, which includes deployment of AMF2 to Steamboat Springs, Colorado. The intensive STORMVEX field phase will begin nominally on 1 November 2010 and extend to approximately early April 2011.

  14. A detection-level hazardous waste ground-water monitoring compliance plan for the 200 areas low-level burial grounds and retrievable storage units

    SciTech Connect (OSTI)

    Not Available

    1987-02-01

    This plan defines the actions needed to achieve detection-level monitoring compliance at the Hanford Site 200 Areas Low-Level Burial Grounds (LLBG) in accordance with the Resource Conservation and Recovery Act (RCRA). Compliance will be achieved through characterization of the hydrogeology and monitoring of the ground water beneath the LLBG located in the Hanford Site 200 Areas. 13 refs., 20 figs.

  15. Fuel Retrieval System Design Verification Report

    SciTech Connect (OSTI)

    GROTH, B.D.

    2000-04-11

    The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway. Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR). A Design Verification Status Questionnaire, Table 1, is included which addresses Corrective Action SNF-EG-MA-EG-20000060, Item No.9 (Miller 2000).

  16. ARM - PI Product - Combined Retrieval, Microphysical Retrievals & Heating

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates ProductsCombined Retrieval, Microphysical Retrievals & Heating Rates ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Combined Retrieval, Microphysical Retrievals & Heating Rates [ research data - ASR funded ] The PNNL Combined Remote Sensor retrieval algorithm (CombRet) is designed to retrieve cloud and precipitation properties for all sky conditions. The retrieval is based on a

  17. Fuel Retrieval System (FRS) Design Verification

    SciTech Connect (OSTI)

    YANOCHKO, R.M.

    2000-01-27

    This document was prepared as part of an independent review to explain design verification activities already completed, and to define the remaining design verification actions for the Fuel Retrieval System. The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR).

  18. SU-E-T-413: Experience-Based VMAT Plan Quality Database

    SciTech Connect (OSTI)

    Bernstein, K; Kalach, N; Wolthuis, B; Tai, C; Kravchuk, A; Bernstein, E

    2014-06-01

    Purpose: To quantify VMAT plan quality using a retrospective study of over 200 clinical treated VMAT plans created using the Eclipse Treatment Planning System to create benchmarks of plan quality for a few categories of treatment sites. Methods: Using a controlled phantom geometry, various dosimetric indices were investigated to quantify dosimetric plan quality as a function of isocenter displacement from center of mass, average path length, number of arcs and PTV proximity to critical structures. Beginning with published dosimetry indices from SRS and SBRT evaluations, UDI (Unified Dosimetry Index) and modified UDI were tested before creating a new factor VMAT-DI. VMAT-DI was developed within boundaries of this project and it includes renormalized factors of conformity index, coverage index, modified gradient index and homogeneity index as well as indices based on routine clinical practice such as absolute dose max index. The plans were then evaluated using the VMAT-DI such that benchmarks for planning could be created. Results: The majority of the plans evaluated could be assigned VMAT-DI values within a range for each treatment site. However, the outliers were results of difficult planning parameters such as very irregular targets, inhomogeneities or difficult to achieve critical structure constraints. To effectively use VMAT-DI for guidance, especially for prediction of the plan quality for body sites new to the practice, VMATDI database needs to be subdivided by target complexity and by body site index/average path length factor. Conclusion: An experienced-based VMAT-DI database can be used to help analyze plans before evaluation by the physician to show that it adheres to the clinical standards of previously treated VMAT plans which will make a guideline for concluding the optimization. The introduction of institution-wide clinical planning protocols, standardizing OAR naming and constraints will make it possible to incorporate a cumulative critical structure

  19. Efficient Graffiti Image Retrieval

    SciTech Connect (OSTI)

    Yang, Chunlei; Wong, Pak C.; Ribarsky, William; Fan, Jianping

    2012-07-05

    Research of graffiti character recognition and retrieval, as a branch of traditional optical character recognition (OCR), has started to gain attention in recent years. We have investigated the special challenge of the graffiti image retrieval problem and propose a series of novel techniques to overcome the challenges. The proposed bounding box framework locates the character components in the graffiti images to construct meaningful character strings and conduct image-wise and semantic-wise retrieval on the strings rather than the entire image. Using real world data provided by the law enforcement community to the Pacific Northwest National Laboratory, we show that the proposed framework outperforms the traditional image retrieval framework with better retrieval results and improved computational efficiency.

  20. Health and safety plan for the Molten Salt Reactor Experiment remediation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Burman, S.N.; Uziel, M.S.

    1995-12-01

    The Lockheed Martin Energy Systems, Inc., (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of the policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  1. Retrieval options study

    SciTech Connect (OSTI)

    Not Available

    1980-03-01

    This Retrieval Options Study is part of the systems analysis activities of the Office of Nuclear Waste Isolation to develop the scientific and technological bases for radioactive waste repositories in various geologic media. The study considers two waste forms, high level waste and spent fuel, and defines various classes of waste retrieval and recovery. A methodology and data base are developed which allow the relative evaluation of retrieval and recovery costs and the following technical criteria: safety; technical feasibility; ease of retrieval; probable intact retrieval time; safeguards; monitoring; criticality; and licensability. A total of 505 repository options are defined and the cost and technical criteria evaluated utilizing a combination of facts and engineering judgments. The repositories evaluated are selected combinations of the following parameters: Geologic Media (salt, granite, basalt, shale); Retrieval Time after Emplacement (5 and 25 years); Emplacement Design (nominal hole, large hole, carbon steel canister, corrosion resistant canister, backfill in hole, nominal sleeves, thick wall sleeves); Emplacement Configuration (single vertical, multiple vertical, single horizontal, multiple horizontal, vaults; Thermal Considerations; (normal design, reduced density, once-through ventilation, recirculated ventilation); Room Backfill; (none, run-of-mine, early, 5 year delay, 25 year delay, decommissioned); and Rate of Retrieval; (same as emplacement, variably slower depending on repository/canister condition).

  2. Dose planning objectives in anal canal cancer IMRT: the TROG ANROTAT experience

    SciTech Connect (OSTI)

    Brown, Elizabeth; Cray, Alison; Haworth, Annette; Chander, Sarat; Lin, Robert; Subramanian, Brindha; Ng, Michael

    2015-06-15

    Intensity modulated radiotherapy (IMRT) is ideal for anal canal cancer (ACC), delivering high doses to irregular tumour volumes whilst minimising dose to surrounding normal tissues. Establishing achievable dose objectives is a challenge. The purpose of this paper was to utilise data collected in the Assessment of New Radiation Oncology Treatments and Technologies (ANROTAT) project to evaluate the feasibility of ACC IMRT dose planning objectives employed in the Australian situation. Ten Australian centres were randomly allocated three data sets from 15 non-identifiable computed tomography data sets representing a range of disease stages and gender. Each data set was planned by two different centres, producing 30 plans. All tumour and organ at risk (OAR) contours, prescription and dose constraint details were provided. Dose–volume histograms (DVHs) for each plan were analysed to evaluate the feasibility of dose planning objectives provided. All dose planning objectives for the bone marrow (BM) and femoral heads were achieved. Median planned doses exceeded one or more objectives for bowel, external genitalia and bladder. This reached statistical significance for bowel V30 (P = 0.04), V45 (P < 0.001), V50 (P < 0.001), external genitalia V20 (P < 0.001) and bladder V35 (P < 0.001), V40 (P = 0.01). Gender was found to be the only significant factor in the likelihood of achieving the bowel V50 (P = 0.03) and BM V30 constraints (P = 0.04). The dose planning objectives used in the ANROTAT project provide a good starting point for ACC IMRT planning. To facilitate clinical implementation, it is important to prioritise OAR objectives and recognise factors that affect the achievability of these objectives.

  3. Engineering test plan for field radionuclide migration experiments in climax granite

    SciTech Connect (OSTI)

    Isherwood, D.; Raber, E.; Stone, R.; Lord, D.; Rector, N.; Failor, R.

    1982-05-01

    This Engineering Test Plan (ETP) describes field studies of radionuclide migration in fractured rock designed for the Climax grainite at the Nevada Test Site. The purpose of the ETP is to provide a detailed written document of the method of accomplishing these studies. The ETP contains the experimental test plans, an instrumentation plan, system schematics, a description of the test facility, and a brief outline of the laboratory support studies needed to understand the chemistry of the rock/water/radionuclide interactions. Results of our initial hydrologic investigations are presented along with pretest predictions based on the hydrologic test results.

  4. Monitored Retrievable Storage Background

    Broader source: Energy.gov [DOE]

    `The U.S. Government is seeking a site for a monitored retrievable storage facility (MRS). Employing proven technologies used in this country and abroad, the MRS will be an Integral part of the...

  5. Environmental planning as a tool for economic development: The black brook watershed experience

    SciTech Connect (OSTI)

    Ryner, P.C.; Heller, G.B.

    1995-12-01

    The Keene, New Hampshire Planning Department has attempted to use environmental planning as a tool to facilitate industrial development of the Black Brook Watershed. The City has established detailed modeling of drainage, floodplains and groundwater, and has placed that information on accurate computer-based maps. When provided to developers at the beginning of the development process, this environmental information expidites design and permitting while also improving the likelihood of protecting sensitive environmental areas. Starting in 1987 as part of a Master Plan revision process, the Planning Department decided to concentrate on the Black Brook Watershed in northwestern Keene as a target area for a new approach to economic development and environmental protection. The entire watershed was chosen as the boundary for this study area and detailed studies were conducted. During this effort the City formulated a new Economic Development Master Plan which called for the creation of approximately 300 acres of new industrial development within the next ten years. The Black Brook basin was identified as the preferred site. Because of pro-active environmental planning, the City is now able to work in active, cooperative partnership with the private sector in the development of this area. It is clear from this first specific development project that the project development and permitting process will be shortened by at least 60 days, and a minimum of $5,000 to $10,000 in preliminary site information costs will be saved. The availability of good information on wetlands and floodplains has already had a dramatic impact upon proposed site design and has achieved the desired objective of avoiding these sensitive areas whenever possible. The City is now working on the design of an Industrial Design and Permitting System which will be applied to the entire City, based upon what has been learned from this effort.

  6. Quality assurance plan for the molten salt reactor experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-02-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by Molten Salt Reactor Experiment (MSRE) Remediation Project personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description, Y/QD-15 Rev. 2 (Martin Marietta Energy Systems, Inc., 1995) and Environmental Management and Enrichment Facilities Work Smart Standards. This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRE Remediation Project. This QAP will be periodically reviewed, revised, and approved as necessary. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  7. ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks-Egypt-Low Carbon Growth Planning Support Redirect page Jump to: navigation, search REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:...

  8. Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information

    Open Energy Info (EERE)

    Mitigation Action Plans and Scenarios (MAPS) (Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) Jump to: navigation, search Retrieved from "http:...

  9. South Africa-National Development Plan: Vision for 2030 | Open...

    Open Energy Info (EERE)

    Development Plan" Retrieved from "http:en.openei.orgwindex.php?titleSouthAfrica-NationalDevelopmentPlan:Visionfor2030&oldid391220" Feedback Contact needs...

  10. Status of the direct absorption receiver panel research experiment: Salt flow and solar test requirements and plans

    SciTech Connect (OSTI)

    Tyner, C.E.

    1989-03-01

    The Panel Research Experiment (PRE) is the first large-scale solar test of the molten nitrate salt direct absorption receiver (DAR) concept. The purpose of the PRE is to demonstrate the engineering feasibility and practicality of the DAR. We will conduct the test at the Central Receiver Test Facility in Albuquerque in two phases: salt flow testing and solar testing. This is a working document to define PRE test objectives and requirements, document the test hardware design, and define test plans. 13 refs., 12 figs., 1 tab.

  11. Status and Planned Experiments of the Hiradmat Pulsed Beam Material Test Facility at CERN SPS

    SciTech Connect (OSTI)

    Charitonidis, Nikolaos; Efthymiopoulos, Ilias; Fabich, Adrian; Meddahi, Malika; Gianfelice-Wendt, Eliana

    2015-06-01

    HiRadMat (High Irradiation to Materials) is a facility at CERN designed to provide high-intensity pulsed beams to an irradiation area where material samples as well as accelerator component assemblies (e.g. vacuum windows, shock tests on high power targets, collimators) can be tested. The beam parameters (SPS 440 GeV protons with a pulse energy of up to 3.4 MJ, or alternatively lead/argon ions at the proton equivalent energy) can be tuned to match the needs of each experiment. It is a test area designed to perform single pulse experiments to evaluate the effect of high-intensity pulsed beams on materials in a dedicated environment, excluding long-time irradiation studies. The facility is designed for a maximum number of 1016 protons per year, in order to limit the activation of the irradiated samples to acceptable levels for human intervention. This paper will demonstrate the possibilities for research using this facility and go through examples of upcoming experiments scheduled in the beam period 2015/2016.

  12. REMOTE RETRIEVING TOOL

    DOE Patents [OSTI]

    Fromm, L.W. Jr.

    1958-08-19

    A retrieving tool is described to securely grasp an object for emplacement in, or withdrawal from, an elongated tube. The object is grasped by hooks actuated by a wedge and cann mechanism. The mechanism on the end of a long rodlike structure is controlled by levers or bars at the access end of the tube. This device is particularly useful for positioning fuel elements within a reactor core.

  13. Storing and Retrieving Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage/Handling Storage/Handling Records Management Procedures for Storage, Transfer & Retrieval of Records from the Washington National Records Center (WNRC) or Legacy Management Business Center RETIREMENT OF RECORDS: 1. The Program Office originates the Records Transmittal and Receipt Form SF-135 (PDF, 107KB), and sends it to IM-23 at doerm@hq.doe.gov for approval. 2. IM-23 reviews the SF-135 for completeness/correctness and coordinates with the originating office by email if more

  14. Recent experience in planning, packaging and preparing noncommercial spent fuel for shipment in the United States

    SciTech Connect (OSTI)

    Shappert, L.B.; Parks, C.V.; Turner, D.W.; Aramayo, G.A.

    1998-05-01

    The US Department of Energy-Headquarters (DOE-HQ) has issued a Record of Decision (ROD) which identified the plan to be followed in managing spent nuclear fuel (SNF) belonging to the Department. As a result, the aluminum-clad fuels stored at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, were directed to be shipped to the Savannah River Site (SRS) near Aiken, South Carolina. The BMI-1 cask was chosen to make the shipments of SNF from dry storage that had to be placed in canisters. However, the Certificate of Compliance (COC) for the BMI-1 cask limited the fissile material loading to 800 g of unirradiated fissile material for the cask configuration chosen. Because about half of the canisters were already filled and sealed with more fissile material than was permitted by the COC, approval to make these shipments in the BMI-1 was requested from the Nuclear Regulatory Commission (NRC). A safety analysis showed that the shipments could be made safely under the conditions identified. The waiver was granted in September 1997 and the three shipments were successfully completed in January 1998.

  15. ARM MJO Investigation Experiment on Gan Island (AMIE-Gan) Science Plan

    SciTech Connect (OSTI)

    Long, CL; Del Genio, A; Deng, M; Fu, X; Gustafson, W; Houze, R; Jakob, C; Jensen, M; Johnson, R; Liu, X; Luke, E; May, P; McFarlane, S; Minnis, P; Schumacher, C; Vogelmann, A; Wang, Y; Webster, P; Xie, S; Zhang, C

    2011-04-11

    The overarching campaign, which includes the ARM Mobile Facility 2 (AMF2) deployment in conjunction with the Dynamics of the Madden-Julian Oscillation (DYNAMO) and the Cooperative Indian Ocean experiment on intraseasonal variability in the Year 2011 (CINDY2011) campaigns, is designed to test several current hypotheses regarding the mechanisms responsible for Madden-Julian Oscillation (MJO) initiation and propagation in the Indian Ocean area. The synergy between the proposed AMF2 deployment with DYNAMO/CINDY2011, and the corresponding funded experiment on Manus, combine for an overarching ARM MJO Investigation Experiment (AMIE) with two components: AMF2 on Gan Island in the Indian Ocean (AMIE-Gan), where the MJO initiates and starts its eastward propagation; and the ARM Manus site (AMIE-Manus), which is in the general area where the MJO usually starts to weaken in climate models. AMIE-Gan will provide measurements of particular interest to Atmospheric System Research (ASR) researchers relevant to improving the representation of MJO initiation in climate models. The framework of DYNAMO/CINDY2011 includes two proposed island-based sites and two ship-based locations forming a square pattern with sonde profiles and scanning precipitation and cloud radars at both island and ship sites. These data will be used to produce a Variational Analysis data set coinciding with the one produced for AMIE-Manus. The synergy between AMIE-Manus and AMIE-Gan will allow studies of the initiation, propagation, and evolution of the convective cloud population within the framework of the MJO. As with AMIE-Manus, AMIE-Gan/DYNAMO also includes a significant modeling component geared toward improving the representation of MJO initiation and propagation in climate and forecast models. This campaign involves the deployment of the second, marine-capable, AMF; all of the included measurement systems; and especially the scanning and vertically pointing radars. The campaign will include sonde

  16. APEX: A Prime EXperiment at Jefferson Lab - Test Run Results and Full Run Plans; Update

    SciTech Connect (OSTI)

    Beacham, James

    2015-06-01

    APEX is an experiment at Thomas Jefferson National Accelerator Facility (JLab) in Virginia, USA, that searches for a new gauge boson (A') with sub-GeV mass and coupling to ordinary matter of g' ~ (10-6 - 10⁻²)e. Electrons impinge upon a fixed target of high-Z material. An A' is produced via a process analogous to photon bremsstrahlung, decaying to an e⁺+e⁻ pair. A test run was held in July of 2010, covering mA' = 175 to 250 MeV and couplings g'/e > 10⁻³. A full run is approved and will cover mA' ~ 65 to 525 MeV and g'/e > 2.3 x 10⁻⁴, and is expected to occur sometime in 2016 or 2017.

  17. Decision analysis of Hanford underground storage tank waste retrieval systems

    SciTech Connect (OSTI)

    Merkhofer, M.W.; Bitz, D.A.; Berry, D.L.; Jardine, L.J.

    1994-05-01

    A decision analysis approach has been proposed for planning the retrieval of hazardous, radioactive, and mixed wastes from underground storage tanks. This paper describes the proposed approach and illustrates its application to the single-shell storage tanks (SSTs) at Hanford, Washington.

  18. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  19. Environmental health and safety plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Burman, S.N.; Tiner, P.F.; Gosslee, R.C.

    1998-01-01

    The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Molten Salt Reactor Experiment (MSRE) facility at the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) are guided by an overall plan and consistent proactive approach to environmental protection and safety and health (S and H) issues. The policy and procedures in this plan apply to all MSRE operations. The provisions of this plan are to be carried out whenever activities are initiated at the MSRE that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and the best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air.

  20. Unvented Drum Handling Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-08-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  1. Radiation Therapy Planning for Early-Stage Hodgkin Lymphoma: Experience of the International Lymphoma Radiation Oncology Group

    SciTech Connect (OSTI)

    Maraldo, Maja V.; Dabaja, Bouthaina S.; Filippi, Andrea R.; Illidge, Tim; Tsang, Richard; Ricardi, Umberto; Petersen, Peter M.; Schut, Deborah A.; Garcia, John; Headley, Jayne; Parent, Amy; Guibord, Benoit; Ragona, Riccardo; Specht, Lena

    2015-05-01

    Purpose: Early-stage Hodgkin lymphoma (HL) is a rare disease, and the location of lymphoma varies considerably between patients. Here, we evaluate the variability of radiation therapy (RT) plans among 5 International Lymphoma Radiation Oncology Group (ILROG) centers with regard to beam arrangements, planning parameters, and estimated doses to the critical organs at risk (OARs). Methods: Ten patients with stage I-II classic HL with masses of different sizes and locations were selected. On the basis of the clinical information, 5 ILROG centers were asked to create RT plans to a prescribed dose of 30.6 Gy. A postchemotherapy computed tomography scan with precontoured clinical target volume (CTV) and OARs was provided for each patient. The treatment technique and planning methods were chosen according to each center's best practice in 2013. Results: Seven patients had mediastinal disease, 2 had axillary disease, and 1 had disease in the neck only. The median age at diagnosis was 34 years (range, 21-74 years), and 5 patients were male. Of the resulting 50 treatment plans, 15 were planned with volumetric modulated arc therapy (1-4 arcs), 16 with intensity modulated RT (3-9 fields), and 19 with 3-dimensional conformal RT (2-4 fields). The variations in CTV-to-planning target volume margins (5-15 mm), maximum tolerated dose (31.4-40 Gy), and plan conformity (conformity index 0-3.6) were significant. However, estimated doses to OARs were comparable between centers for each patient. Conclusions: RT planning for HL is challenging because of the heterogeneity in size and location of disease and, additionally, to the variation in choice of treatment techniques and field arrangements. Adopting ILROG guidelines and implementing universal dose objectives could further standardize treatment techniques and contribute to lowering the dose to the surrounding OARs.

  2. Guidelines for Low Emission Land use Planning | Open Energy Informatio...

    Open Energy Info (EERE)

    and will provide guidance and the integration of a range of tools to develop REDD+ strategy documents or low emissions plans for AFOLU. References Retrieved from "http:...

  3. Mexico-IAEA Energy Planning | Open Energy Information

    Open Energy Info (EERE)

    IAEA is working with Mexico to Support Medium and Long Term Planning for the Expansion of Electricity Generation Capacity. References "IAEA Project database - Mexico" Retrieved...

  4. OAR - Division 100-Wildlife Diversity Plan | Open Energy Information

    Open Energy Info (EERE)

    availability: http:crossref.org Citation Retrieved from "http:en.openei.orgwindex.php?titleOAR-Division100-WildlifeDiversityPlan&oldid792434" Feedback Contact...

  5. Cote d'Ivoire IAEA Energy Planning | Open Energy Information

    Open Energy Info (EERE)

    "IAEA Project Database" Retrieved from "http:en.openei.orgwindex.php?titleCoted%27IvoireIAEAEnergyPlanning&oldid328577" Feedback Contact needs updating Image...

  6. Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiments - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy

  7. CHALLENGES WITH RETRIEVING TRANSURANIC WASTE FROM THE HANFORD BURIAL GROUNDS

    SciTech Connect (OSTI)

    SWAN, R.J.; LAKES, M.E.

    2007-08-06

    The U.S. DOE's Hanford Reservation produced plutonium and other nuclear materials for the nation's defense starting in World War II. The defense mission generated wastes that were either retrievably stored (i.e. retrievably stored waste) and/or disposed of in burial grounds. Challenges have emerged from retrieving suspect TRU waste including adequacy of records, radiological concerns, container integrity, industrial hygiene and safety issues, the lack of processing/treatment facilities, and the integration of regulatory requirements. All retrievably stored waste is managed as mixed waste and assumed to be TRU waste, unless documented otherwise. Mixed waste is defined as radioactive waste that contains hazardous constituents. The Atomic Energy Act governs waste with radionuclides, and the Resource Conservation and Recovery Act (RCRA) governs waste with hazardous constituents. Waste may also be governed by the Toxic Substances Control Act (TSCA), and a portion may be managed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In 1970, TRU waste was required to be placed in 20-year retrievable storage and segregated from other Waste. Prior to that date, segregation did not occur. Because of the changing definition of TRU over the years, and the limitations of early assay equipment, all retrievably stored waste in the burial grounds is managed as suspect TRU. Experience has shown that some of this waste will be characterized as low-level (non-TRU) waste after assay. The majority of the retrieved waste is not amenable to sampling due to waste type and/or radiological issues. Key to waste retrieval and disposition are characterization, historical investigation and research, knowledge of past handling and packaging, as well as a broad understanding and application of the regulations.

  8. Experiment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MiniBooNE Experiment September, 2002 SeptemMyungkee Sung (LSU/MiniBooNE) 4th International Workshop on the Identification of Dark Matter Cosmologically Interesting Region; Hot Dark Matter? LSND Signal at High ∆m 2 KARMEN II narrowed the signal region MiniBooNE will fully address this signal. Neutrino Osillation at High ∆m 2 LSND: Searching for ν µ →ν e ν µ - From µ + decay at rest with endpoint energy 53 MeV L = 30m, L/E ~ 1m/MeV, 167 tons of Mineral Oil Look for ν e Appearance: ν

  9. Multimedia Information Retrieval Literature Review

    SciTech Connect (OSTI)

    Wong, Pak C.; Bohn, Shawn J.; Payne, Deborah A.

    2010-10-12

    This survey paper highlights some of the recent, influential work in multimedia information retrieval (MIR). MIR is a branch area of multimedia (MM). The young and fast-growing area has received strong industrial and academic support in the United States and around the world (see Section 7 for a list of major conferences and journals of the community). The term "information retrieval" may be misleading to those with different computer science or information technology backgrounds. As shown in our discussion later, it indeed includes topics from user interaction, data analytics, machine learning, feature extraction, information visualization, and more.

  10. Phase 2, Solid waste retrieval strategy

    SciTech Connect (OSTI)

    Johnson, D.M.

    1994-09-29

    Solid TRU retrieval, Phase 1 is scheduled to commence operation in 1998 at 218W-4C-T01 and complete recovery of the waste containers in 2001. Phase 2 Retrieval will recover the remaining buried TRU waste to be retrieved and provide the preliminary characterization by non-destructive means to allow interim storage until processing for disposal. This document reports on researching the characterization documents to determine the types of wastes to be retrieved and where located, waste configurations, conditions, and required methods for retrieval. Also included are discussions of wastes encompassed by Phase 2 for which there are valid reasons to not retrieve.

  11. Cloud-Scale Vertical Velocity and Turbulent Dissipation Rate Retrievals

    SciTech Connect (OSTI)

    Shupe, Matthew

    2013-05-22

    Time-height fields of retrieved in-cloud vertical wind velocity and turbulent dissipation rate, both retrieved primarily from vertically-pointing, Ka-band cloud radar measurements. Files are available for manually-selected, stratiform, mixed-phase cloud cases observed at the North Slope of Alaska (NSA) site during periods covering the Mixed-Phase Arctic Cloud Experiment (MPACE, late September through early November 2004) and the Indirect and Semi-Direct Aerosol Campaign (ISDAC, April-early May 2008). These time periods will be expanded in a future submission.

  12. Cloud-Scale Vertical Velocity and Turbulent Dissipation Rate Retrievals

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Shupe, Matthew

    Time-height fields of retrieved in-cloud vertical wind velocity and turbulent dissipation rate, both retrieved primarily from vertically-pointing, Ka-band cloud radar measurements. Files are available for manually-selected, stratiform, mixed-phase cloud cases observed at the North Slope of Alaska (NSA) site during periods covering the Mixed-Phase Arctic Cloud Experiment (MPACE, late September through early November 2004) and the Indirect and Semi-Direct Aerosol Campaign (ISDAC, April-early May 2008). These time periods will be expanded in a future submission.

  13. Can I solve my structure by SAD phasing? Planning an experiment, scaling data and evaluating the useful anomalous correlation and anomalous signal

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Terwilliger, Thomas C.; Bunkóczi, Gábor; Hung, Li-Wei; Zwart, Peter H.; Smith, Janet L.; Akey, David L.; Adams, Paul D.

    2016-03-01

    A key challenge in the SAD phasing method is solving a structure when the anomalous signal-to-noise ratio is low. Here, we describe algorithms and tools for evaluating and optimizing the useful anomalous correlation and the anomalous signal in a SAD experiment. A simple theoretical framework [Terwilliger et al.(2016),Acta Cryst.D72, 346–358] is used to develop methods for planning a SAD experiment, scaling SAD data sets and estimating the useful anomalous correlation and anomalous signal in a SAD data set. Thephenix.plan_sad_experimenttool uses a database of solved and unsolved SAD data sets and the expected characteristics of a SAD data set to estimatemore » the probability that the anomalous substructure will be found in the SAD experiment and the expected map quality that would be obtained if the substructure were found. Thephenix.scale_and_mergetool scales unmerged SAD data from one or more crystals using local scaling and optimizes the anomalous signal by identifying the systematic differences among data sets, and thephenix.anomalous_signaltool estimates the useful anomalous correlation and anomalous signal after collecting SAD data and estimates the probability that the data set can be solved and the likely figure of merit of phasing.« less

  14. Early Commissioning Experience and Future Plans for the 12 GeV Continuous Electron Beam Accelerator Facility

    SciTech Connect (OSTI)

    Spata, Michael F.

    2014-12-01

    Jefferson Lab has recently completed the accelerator portion of the 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility. All 52 SRF cryomodules have been commissioned and operated with beam. The initial beam transport goals of demonstrating 2.2 GeV per pass, greater than 6 GeV in 3 passes to an existing experimental facility and greater than 10 GeV in 5-1/2 passes have all been accomplished. These results along with future plans to commission the remaining beamlines and to increase the performance of the accelerator to achieve reliable, robust and efficient operations at 12 GeV are presented.

  15. Energy Planning

    Broader source: Energy.gov (indexed) [DOE]

    Energy Planning Agenda * What is energy planning? * The process * The plan * Strategic Energy Planning (SEP) Workbook * Other resources 2 What is Energy Planning? * Brings desired ...

  16. Planning for hybrid-cycle OTEC experiments using the HMTSTA test facility at the Natural Energy Laboratory of Hawaii

    SciTech Connect (OSTI)

    Panchal, C.; Rabas, T.; Genens, L.

    1989-01-01

    The US Department of Energy has built an experimental apparatus for studying the open-cycle Ocean Thermal Energy Conversion (OC-OTEC) system. Experiments using warm and cold seawater are currently uderway to validate the performance predictions for an OC-TEC flash evaporator, surface condenser, and direct-contact condenser. The hybrid cycle is another OTEC option that produces both power and desalinated water, it is comparable in capital cost to OC-OTEC, and it eliminates the problems associated with the large steam turbine. Means are presented in this paper for modifying the existing apparatus to conduct similar experiments on hybrid-cycle OTEC heat exchangers. These data are required to validate predictive methods of the components and for the system integration that were identified in an earlier study of hybrid-cycle OTEC power plants. 7 refs., 4 figs., 2 tabs.

  17. AMIE (ARM MJO Investigation Experiment): Observations of the Madden-Julian Oscillation for Modeling Studies Science Plan

    SciTech Connect (OSTI)

    Long, C; Del Genio, A; Gustafson, W; Houze, R; Jakob, C; Jensen, M; Klein, S; Leung, L Ruby; Liu, X; Luke, E; May, P; McFarlane, S; Minnis, P; Schumacher, C; Vogelmann, A; Wang, Y; Wu, X; Xie, S

    2010-03-22

    Deep convection in the tropics plays an important role in driving global circulations and the transport of energy from the tropics to the mid-latitudes. Understanding the mechanisms that control tropical convection is a key to improving climate modeling simulations of the global energy balance. One of the dominant sources of tropical convective variability is the Madden-Julian Oscillation (MJO), which has a period of approximately 30–60 days. There is no agreed-upon explanation for the underlying physics that maintain the MJO. Many climate models do not show well-defined MJO signals, and those that do have problems accurately simulating the amplitude, propagation speed, and/or seasonality of the MJO signal. Therefore, the MJO is a very important modeling target for the ARM modeling community geared specifically toward improving climate models. The ARM MJO Investigation Experiment (AMIE) period coincides with a large international MJO initiation field campaign called CINDY2011 (Cooperative Indian Ocean experiment on intraseasonal variability in the Year 2011) that will take place in and around the Indian Ocean from October 2011 to January 2012. AMIE, in conjunction with CINDY2011 efforts, will provide an unprecedented data set that will allow investigation of the evolution of convection within the framework of the MJO. AMIE observations will also complement the long-term MJO statistics produced using ARM Manus data and will allow testing of several of the current hypotheses related to the MJO phenomenon. Taking advantage of the expected deployment of a C-POL scanning precipitation radar and an ECOR surface flux tower at the ARM Manus site, we propose to increase the number of sonde launches to eight per day starting in about mid-October of the field experiment year, which is climatologically a period of generally suppressed conditions at Manus and just prior to the climatologically strongest MJO period. The field experiment will last until the end of the MJO

  18. Internationally monitored retrievable storage system

    SciTech Connect (OSTI)

    Hafele, W.

    1996-12-31

    The proposed internationally monitored retrievable storage system (IMRSS) is intended to provide an orderly and secure alternative to continuation of the current individualistic spent-fuel management trends in nuclear-power countries. The IMRSS concept, in its broadest terms, proposes that an international entity undertake the management responsibility for spent fuel after its discharge from power plant cooling ponds. The IMRSS envisages international management of a small number of surface (or near-surface) storage facilities distributed globally (in major nuclear countries and elsewhere) and a transportation system between nuclear plants and the storage facilities. The International Atomic Energy Agency (IAEA) would maintain responsibility for adherence to safeguards criteria. The IMRSS operation would be similar to that of an international bank, with each nation maintaining title to its spent fuel and able to withdraw it for peaceful purposes. The system would provide transparency, accountability, and security. The IMRSS would be a step to establishing an inter- national regime for the prudent management of spent fuel and excess civilian plutonium. The IMRSS concept has been studied in three international workshops. Among the major issues that have been addressed are the global distribution of spent fuel if current trends continue, the need for international criteria and management to ensure public health and nonproliferation, the value of spent-fuel retrievability, the future role of a plutonium resource in the fuel cycle, the operating format of a practical IMRSS, and the integration of an IMRSS with existing geopolitical agreements and arrangements.

  19. Study to develop an inspection, maintenance, and repair plan for OTEC (Ocean Thermal Energy Conversion) modular experiment plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The inspection, maintenance and repair (IM and R) of the Ocean Thermal Energy Conversion (OTEC) Modular Experiment Plant (Pilot Plant) have been studied in two phases: Task I and Task II. Task I phase developed IM and R identification forms, identified requirements for routine and post casualty IM and R, and categorized and outlined potential procedures to perform IM and R activities. The efforts of the Task II phase have been directed to meet the following objectives: to provide feedback to the OTEC marine systems designs to assure that such designs reflect appropriate consideration of IM and R methods and unit costs, resulting in designs with reduced life cycle costs; to include technical information concerning OTEC IM and R possibilities to NOAA/DOE; to outline a basis in which the anticipated IM and R contributions to life cycle costs can be developed for any specific OTEC plant design; to identify IM and R methods within the state-of-the-art in the offshore industry; to determine the application of potential IM and R procedures for the commercial operation of OTEC 10/40 Pilot Plant(s); and input into the US government formulation of statutory and regulatory IM and R requirements for OTEC plants.

  20. Waste Stream Generated and Waste Disposal Plans for Molten Salt Reactor Experiment at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Haghighi, M. H.; Szozda, R. M.; Jugan, M. R.

    2002-02-26

    The Molten Salt Reactor Experiment (MSRE) site is located in Tennessee, on the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR), south of the Oak Ridge National Laboratory (ORNL) main plant across Haw Ridge in Melton Valley. The MSRE was run by ORNL to demonstrate the desirable features of the molten-salt concept in a practical reactor that could be operated safely and reliably. It introduced the idea of a homogeneous reactor using fuel salt media and graphite moderation for power and breeder reactors. The MSRE reactor and associated components are located in cells beneath the floor in the high-bay area of Building 7503 (Figure 1). The reactor was operated from June 1965 to December 1969. When the reactor was shut down, fuel salt was drained from the reactor circuit to two drain tanks. A ''clean'' salt was then circulated through the reactor as a decontamination measure and drained to a third drain tank. When operations ceased, the fuel and flush salts were allowed t o cool and solidify in the drain tanks. At shutdown, the MSRE facility complex was placed in a surveillance and maintenance program. As a result of the S&M program, it was discovered in 1994 that gaseous uranium (233U/232U) hexafluoride (UF6) had moved throughout the MSRE process systems. The UF6 was generated when radiolysis of the fluorine salts caused the individual constituents to dissociate to their component atoms, including free fluorine.Some of the free fluorine combined with uranium fluorides (UF4) in the salt to form UF6. UF6 is gaseous at slightly above ambient temperatures; thus, periodic heating of the fuel salts (which was intended to remedy the radiolysis problems) and simple diffusion had allowed the UF6 to move out of the salt and into the process systems of MSRE.

  1. Surface Radiation Budget from ARM Satellite Retrievals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Surface Radiation Budget from ARM Satellite Retrievals P. Minnis, D. P. Kratz, and T. P. ... Hampton, Virginia Introduction Since the Atmospheric Radiation Measurement (ARM) Program ...

  2. ARM - Publications: Science Team Meeting Documents: Retrievals...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    radar (MMCR) and oxygen-A band. The oxygen-A band measurement with photon path length information provides additional constraints on the radar retrieval, resulting more...

  3. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  4. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final

  5. Improvement of Stent Retriever Design and Efficacy of Mechanical Thrombectomy in a Flow Model

    SciTech Connect (OSTI)

    Wenger, Katharina; Nagl, Frank; Wagner, Marlies Berkefeld, Joachim

    2013-02-15

    In vitro experiments were performed to evaluate the efficacy of mechanical intracranial thrombectomy comparing the newly developed Aperio stent retriever and standard devices for stroke treatment. The Aperio (A), with an increased working length of 4 cm and a special cell design for capturing and withholding clots, was compared to three benchmark devices: the Solitaire retrievable stent (B), the Merci X6 (C), and the Merci L5 retriever (D). In a vascular glass model with pulsatile flow, reminiscent of the M1 segment of the middle cerebral artery, we repeatedly induced occlusion by generating thrombi via a modified Chandler loop system. The numbers of recanalization attempts, peripheral embolizations, and recanalizations at the site of occlusion were recorded during 10 retrieval experiments with each device. Eleven devices were able to remove the blood clots from the occluded branch. In 34 of 40 experiments, restoration of flow was obtained in 1-3 attempts. The main differences between the study devices were observed in terms of clot withholding and fragmentation during retrieval. Although there was only one fragmentation recorded for device A, disengagement of the whole clot or peripheral embolization of fragments occurred more frequently (5-7 times) with devices B, C, and D. In a vascular model, the design of device A was best at capturing and withholding thrombi during retrieval. Further study will be necessary to see whether this holds true in clinical applications.

  6. Coplanar Doppler Lidar Retrieval of Rotors from T-REX

    SciTech Connect (OSTI)

    Hill, Michael; Calhoun, Ron; Fernando, H. J. S.; Wieser, Andreas; Dornbrack, Andreas; Weissmann, Martin; Mayr, G.; Newsom, Rob K.

    2010-03-01

    Two coherent Doppler lidars were deployed during the Terrain-induced Rotor EXperiment (T-REX). Coplanar Range Height Indicator (RHI) scans by the lidars (along the same azimuthal angle) allowed retrieval of two-dimensional velocity vectors on a vertical/cross-barrier plane using the least squares method. Vortices are shown to evolve and advect in the flow field, allowing analysis of their behavior in the mountain-wave-boundary layer system. The locations, magnitudes, and evolution of the vortices can be studied through calculated fields of velocity, vorticity, streamlines, and swirl. Two classes of vortical motions are identified: rotors and sub-rotors, which differ in scale and behavior. The level of coordination of the two lidars and the nature of the output (i.e., in range-gates) creates inherent restrictions on the spatial and temporal resolution of retrieved fields.

  7. Estimating Missing Features to Improve Multimedia Information Retrieval

    SciTech Connect (OSTI)

    Bagherjeiran, A; Love, N S; Kamath, C

    2006-09-28

    Retrieval in a multimedia database usually involves combining information from different modalities of data, such as text and images. However, all modalities of the data may not be available to form the query. The retrieval results from such a partial query are often less than satisfactory. In this paper, we present an approach to complete a partial query by estimating the missing features in the query. Our experiments with a database of images and their associated captions show that, with an initial text-only query, our completion method has similar performance to a full query with both image and text features. In addition, when we use relevance feedback, our approach outperforms the results obtained using a full query.

  8. Project Specific Quality Assurance Plan (QAPP)

    SciTech Connect (OSTI)

    Huston, J.J.

    1994-11-01

    The Project QAPP`s describe the program and the planned actions which WHC will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C. The Project involves retrieving the high-heat waste from Tank 241-C-106 to close the safety issue associate with the tank, demonstrate initial waste retrieval technology for a Single Shell Tank, and provide feed for the Hanford Waste Vitrification Plant.

  9. Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk

    SciTech Connect (OSTI)

    Hall, C.E.

    1998-01-09

    Before RL can authorize proceeding with Phase 1B, the PHMC team must demonstrate its readiness to retrieve and deliver the waste to the private contractors and to receive and dispose of the products and byproducts returned from the treatment. The PHMC team has organized their plans for providing these vitrification-support services into the Retrieval and Disposal Mission within the Tank Waste Remediation System (TWRS) Program.

  10. Hanford Tank Waste Retrieval, Treatment and Disposition Framework...

    Office of Environmental Management (EM)

    Hanford Tank Waste Retrieval, Treatment and Disposition Framework Hanford Tank Waste Retrieval, Treatment and Disposition Framework Completing the Office of River Protection (ORP) ...

  11. ARM Cloud Retrieval Ensemble Data Set (ACRED) (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    The techniques used for the nine cloud retrievals are briefly described in this document. This document also outlines the ACRED data availability, variables, and the nine retrieval ...

  12. Development and application of new methods to retrieve vertical...

    Office of Scientific and Technical Information (OSTI)

    information, so developments of remote sensing methods for retrievals of parameters in precipitating cloud condition was essential. Providing modelers with retrieval results ...

  13. Development and application of new methods to retrieve vertical...

    Office of Scientific and Technical Information (OSTI)

    methods for retrievals of parameters in precipitating cloud condition was essential. Providing modelers with retrieval results was also one of the key objectives of this research ...

  14. Aerosol Retrievals from ARM SGP MFRSR Data (Dataset) | Data Explorer

    Office of Scientific and Technical Information (OSTI)

    Aerosol Retrievals from ARM SGP MFRSR Data Title: Aerosol Retrievals from ARM SGP MFRSR Data The Multi-Filter Rotating Shadowband Radiometer (MFRSR) makes precise simultaneous ...

  15. ARM: Microwave Radiometer Retrievals (MWRRET) of Cloud Liquid...

    Office of Scientific and Technical Information (OSTI)

    Microwave Radiometer Retrievals (MWRRET) of Cloud Liquid Water and Precipitable Water Vapor Title: ARM: Microwave Radiometer Retrievals (MWRRET) of Cloud Liquid Water and ...

  16. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office...

  17. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  18. Technical requirements specification for tank waste retrieval

    SciTech Connect (OSTI)

    Lamberd, D.L.

    1996-09-26

    This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

  19. Environmental impacts of proposed Monitored Retrievable Storage

    SciTech Connect (OSTI)

    Scharber, Wayne K.; Macintire, H. A.; Davis, Paul E.; Cothron, Terry K.; Stephens, Barry K.; Travis, Norman; Walter, George; Mobley, Mike

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  20. ARM - Publications: Science Team Meeting Documents: Retrieval...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Retrieval of optical thickness of low-level water cloud using the MSG multi-channel data Inoue, Toshiro MRIJMA We studied the optical thickness of low-level water cloud using MSG...

  1. SU-E-T-213: Initial Experience with VMAT Plan and Delivery Verification Using a DICOM-RT Framework and Linac Delivery Log Files

    SciTech Connect (OSTI)

    Reynolds, R; Pompos, A; Gu, X; Jiang, S; Stojadinovic, S

    2014-06-01

    Purpose: Mobius3D/MobiusFX (M3D/MFX), a commercial DICOM-RT based plan and delivery verification system, was used to compare calculated and delivered volumetric modulated arc therapy (VMAT) dose distributions using TrueBeam delivery log files (TrajectoryLogs). Methods: M3D/MFX utilizes measured linac commissioning data to generate institution specific beam models for evaluating planned and delivered dose distributions. 30 RapidArc prostate plans and 30 head and neck SmartArc plans were used in this study. For every plan, CT images, contoured structure sets, RT-plan, and RT-dose files were exported to M3D, which recalculated the patients’ planning CT dose distributions using a collapsed-cone-convolutionsuperposition algorithm. MFX utilized the acquired TrajectoryLogs to compute patients’ delivered dose distributions based on actual treatment delivery parameters. The agreement between computed and delivered dose distributions was evaluated utilizing a (3%, 3mm) global 3D-gamma analysis and dose-volume histogram changes for targets and organs at risk. Results: Excellent 3D-gamma agreements were observed for all VMAT plans. On average, for computed and delivered RapidArc and SmartArc plans the gamma passing rates were (99.0%±1.4%) and (96.8%±1.8%), respectively. The average difference for primary target prescription dose percent-coverage between calculated and delivered plans was (− 0.09%±2.52%) for RapidArc and (−2.71%±4.62%) for SmartArc cases. Similarly, the planning target mean dose differences were (1.38%±0.96%) for RapidArc and (1.17%±0.72%) for SmartArc plans. For the prostate plans, the calculated and delivered variations of the maximum dose for a 2cc volume for bladder and rectum were (1.32%±1.26%) and (0.65%±1.44%), respectively. The spinal-cord 2cc maximum dose differences of (3.26%±1.68%) were observed for the SmartArc plans. Conclusions: Clinical quality assurance practice based on linac treatment log files for verification of delivered 3D

  2. Zenith Radiance Retrieval of Cloud Properties

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    retrievals of cloud properties from the AMF/COPS campaign Preliminary retrievals of cloud properties from the AMF/COPS campaign Christine Chiu, UMBC/JCET Alexander Marshak, GSFC Yuri Knyazikhin, Boston University Warren Wiscombe, GSFC Christine Chiu, UMBC/JCET Alexander Marshak, GSFC Yuri Knyazikhin, Boston University Warren Wiscombe, GSFC The cloud optical properties of interest are: The cloud optical properties of interest are: * Cloud optical depth τ - the great unknown * Radiative cloud

  3. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  4. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect (OSTI)

    CERTA PJ

    2008-07-10

    management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its

  5. DOE Integrated Safeguards and Security (DISS) historical document archival and retrieval analysis, requirements and recommendations

    SciTech Connect (OSTI)

    Guyer, H.B.; McChesney, C.A.

    1994-10-07

    The overall primary Objective of HDAR is to create a repository of historical personnel security documents and provide the functionality needed for archival and retrieval use by other software modules and application users of the DISS/ET system. The software product to be produced from this specification is the Historical Document Archival and Retrieval Subsystem The product will provide the functionality to capture, retrieve and manage documents currently contained in the personnel security folders in DOE Operations Offices vaults at various locations across the United States. The long-term plan for DISS/ET includes the requirement to allow for capture and storage of arbitrary, currently undefined, clearance-related documents that fall outside the scope of the ``cradle-to-grave`` electronic processing provided by DISS/ET. However, this requirement is not within the scope of the requirements specified in this document.

  6. Tank waste remediation system simulation analysis retrieval model

    SciTech Connect (OSTI)

    Fordham, R.A.

    1996-09-30

    The goal of simulation was to test tll(., consequences of assumptions. For the TWRS SIMAN Retrieval Model, l@lie specific assumptions are primarily defined with respect to waste processing arid transfer timing. The model tracks 73 chem1913ical constituents from underground waste tanks to glass; yet, the detailed (@hemistrv and complete set of unit operations of the TWRS process flow sheet are represented only at the level necessary to define the waste processing and transfer logic and to estimate the feed composition for the treatment facilities. Tlierefor(,, the model should net be regarded as a substitute for the TWRS process flow sheet. Pra(!ticallv the model functions as a dyrt(imic extension of the flow sheet model. I I The following sections present the description, assunipt@ions, architecture, arid evalua- tion of the TWRS SIMAN Retrieval Model. Section 2 describes the model in terms of an overview of the processes represented. Section 3 presents the assumptions for the simulation model. Specific assumptions 9.tt(l parameter values used in the model are provided for waste retrieval, pretreatment, low-level waste (LLNN7) immobilization, and high-level waste (HLW) immobilization functions. Section 4 describes the model in terms of its functional architec- rare to d(@fine a basis for a systematic evaluation of the model. Finally, Section 5 documents an independent test and evaluation of the niodel`s performance (i.e., the verification and validation). Additionally, Appendix A gives a complete listing of the tank inventory used. Appendix B documents the verification and validation plan that was used for the (Section 5) evaluation work. A description and listing of all the model variables is given in Appendix C along with a complete source listing.

  7. AEC Experiment Establishes Computer Link Between California and...

    Office of Scientific and Technical Information (OSTI)

    The experiment was conducted using a special information retrieval language known as RECON, which was developed for NASA at the Lockheed Palo Alto Research Laboratory. The AEC over ...

  8. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  9. ARM - SPARTICUS Planning - Data Plots

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurements SGP Data Plots NASA Data Plots ARM Data Discovery Browse Data Experiment Planning SPARTICUS Proposal Abstract Science Questions Science and Operations (PDF, 1.01M)...

  10. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Vision Plan The Lab offers employees and their eligible dependents free vision coverage through Vision Service Plan (VSP). The plan covers exams, contact lenses, eyeglass lenses and frames. Participants can use any provider but VSP network providers offer the best value and will file the claim

  11. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  12. Low-level waste feed staging plan

    SciTech Connect (OSTI)

    Certa, P.J.; Grams, W.H.; McConville, C.M.; L. W. Shelton, L.W.; Slaathaug, E.J., Westinghouse Hanford

    1996-08-12

    The `Preliminary Low-Level Waste Feed Staging Plan` was updated to reflect the latest requirement in the Tank Waste Remediation Privatization Request for Proposals (RFP) and amendments. The updated plan develops the sequence and transfer schedule for retrieval of DST supernate by the management and integration contractor and delivery of the staged supernate to the private low-activity waste contractors for treatment. Two DSTs are allocated as intermediate staging tanks. A transfer system conflict analysis provides part of the basis for determining transfer system upgrade requirements to support both low-activity and high-level waste feed delivery. The intermediate staging tank architecture and retrieval system equipment are provided as a planning basis until design requirements documents are prepared. The actions needed to successfully implement the plan are identified. These include resolution of safety issues and changes to the feed envelope limits, minimum order quantities, and desired batch sizes.

  13. Partnership Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Plan July 2016 July 2016 Page 1 U.S. DRIVE Partnership Plan Table of Contents Foreword ....................................................................................................................................................... 2 Definition ...................................................................................................................................................... 3 Partners

  14. SU-E-I-97: Smart Auto-Planning Framework in An EMR Environment (SAFEE)

    SciTech Connect (OSTI)

    Zhang, B; Chen, S; Mutaf, Y; Prado, K; D'Souza, W

    2014-06-01

    Purpose: Our Radiation Oncology Department uses clinical practice guidelines for patient treatment, including normal tissue sparing and other dosimetric constraints. These practice guidelines were adapted from national guidelines, clinical trials, literature reviews, and practitioner's own experience. Modern treatment planning systems (TPS) have the capability of incorporating these practice guidelines to automatically create radiation therapy treatment plans with little human intervention. We are developing a software infrastructure to integrate clinical practice guidelines and radiation oncology electronic medical record (EMR) system into radiation therapy treatment planning system (TPS) for auto planning. Methods: Our Smart Auto-Planning Framework in an EMR environment (SAFEE) uses a software pipeline framework to integrate practice guidelines,EMR, and TPS together. The SAFEE system starts with retrieving diagnosis information and physician's prescription from the EMR system. After approval of contouring, SAFEE will automatically create plans according to our guidelines. Based on clinical objectives, SAFEE will automatically select treatment delivery techniques (such as, 3DRT/IMRT/VMAT) and optimize plans. When necessary, SAFEE will create multiple treatment plans with different combinations of parameters. SAFEE's pipeline structure makes it very flexible to integrate various techniques, such as, Model-Base Segmentation (MBS) and plan optimization algorithms, e.g., Multi-Criteria Optimization (MCO). In addition, SAFEE uses machine learning, data mining techniques, and an integrated database to create clinical knowledgebase and then answer clinical questions, such as, how to score plan quality or how volume overlap affects physicians' decision in beam and treatment technique selection. Results: In our institution, we use Varian Aria EMR system and RayStation TPS from RaySearch, whose ScriptService API allows control by external programs. These applications are

  15. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  16. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    SciTech Connect (OSTI)

    Boston, H.L.

    1998-01-07

    This memorandum provides a summary of PHMC [Project Hanford Management Contract] team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to-proceed, a summary of the PHMC team readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  17. Tank waste remediation system retrieval and disposal mission readiness-to-proceed memorandum

    SciTech Connect (OSTI)

    Jordan, K.N.

    1998-01-09

    This memorandum provides a summary of PHMC (Project Hanford Management Contract) team work scope for the Phase 1 TWRS Retrieval and Disposal Mission, a declaration of readiness-to proceed, a summary of the PHMC readiness evaluation process, summary results of a structured independent appraisal and financial analysis including information associated with assumptions, risks, and recommendations and, a summary of program plans for the PHMC team`s component of the Phase 1 Mission.

  18. Waste Emplacement/Retrieval System Description Document

    SciTech Connect (OSTI)

    Eric Loros

    2001-07-25

    The Waste Emplacement/Retrieval System transports Waste Packages (WPs) from the Waste Handling Building (WHB) to the subsurface area of emplacement, and emplaces the WPs once there. The Waste Emplacement/Retrieval System also, if necessary, removes some or all of the WPs from the underground and transports them to the surface. Lastly, the system is designed to remediate abnormal events involving the portions of the system supporting emplacement or retrieval. During emplacement operations, the system operates on the surface between the WHB and North Portal, and in the subsurface in the North Ramp, access mains, and emplacement drifts. During retrieval or abnormal conditions, the operations areas may also extend to a surface retrieval storage site and South Portal on the surface, and the South Ramp in the subsurface. A typical transport and emplacement operation involves the following sequence of events. A WP is loaded into a WP transporter at the WHB, and coupled to a pair of transport locomotives. The locomotives transport the WP from the WHB, down the North Ramp, and to the entrance of an emplacement drift. Once docked at the entrance of the emplacement drift, the WP is moved outside of the WP transporter, and engaged by a WP emplacement gantry. The WP emplacement gantry lifts the WP, and transports it to its emplacement location, where the WP is then lowered to its final resting position. The WP emplacement gantry remains in the drift while the WP transporter is returned to the WHB by the locomotives. When the transporter reaches the WHB, the sequence of operations is repeated. Retrieval of all the WPs, or a large group of WPs, under normal conditions is achieved by reversing the emplacement operations. Retrieval of a small set of WPs, under normal or abnormal conditions, is known as recovery. Recovery performed under abnormal conditions will involve a suite of specialized equipment designed to perform a variety of tasks to enable the recovery process. Recovery

  19. ARM - PI Product - In-Situ Data for Microphysical Retrievals: TC4, 2007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ProductsIn-Situ Data for Microphysical Retrievals: TC4, 2007 Citation DOI: 10.5439/1244832 [ What is this? ] ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : In-Situ Data for Microphysical Retrievals: TC4, 2007 [ ARM research ] This data set is derived from measurements collected in situ by the NASA DC8 during the Tropical Cloud Climate Composition Coupling Experiment (TC4) that was conducted during July

  20. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  1. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  2. Using an Innovative Technique to Retrieve Oil in Lawrence County...

    Energy Savers [EERE]

    Using an Innovative Technique to Retrieve Oil in Lawrence County, Illinois Using an Innovative Technique to Retrieve Oil in Lawrence County, Illinois April 25, 2012 - 5:07pm ...

  3. Hanford Tank Farm Workers Begin Tank Waste Retrieval Ahead of...

    Office of Environmental Management (EM)

    Tank Farm Workers Begin Tank Waste Retrieval Ahead of Schedule Hanford Tank Farm Workers Begin Tank Waste Retrieval Ahead of Schedule March 16, 2016 - 12:35pm Addthis Workers ...

  4. Guideline For Retrieving Customer Usage Data From Utilities

    Broader source: Energy.gov [DOE]

    This webinar, held on Dec. 16, 2010, provides information for utilities interested in retrieving data on customer usage.

  5. Creation of the dam for the No. 2 Kambaratinskaya HPP by large-scale blasting: analysis of planning experience and lessons learned

    SciTech Connect (OSTI)

    Shuifer, M. I.; Argal, E. S.

    2012-05-15

    Results of complex instrument observations and video taping during large-scale blasts detonated for creation of the dam at the No. 2 Kambaratinskaya HPP on the Naryn River in the Kyrgyz Republic are analyzed. Tests of the energy effectiveness of the explosives are evaluated, characteristics of LSB manifestations in seismic and air waves are revealed, and the shaping and movement of the rock mass are examined. A methodological analysis of the planning and production of the LSB is given.

  6. Retrieval Of Final Stored Radioactive Waste Resumes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits » Retirement Retirement Retirement Plans Your appointment type determines your eligibility for retirement coverage similar to the eligibility requirements for enrollment in the insurance programs. If your appointment confers eligibility you will automatically be enroll in the applicable retirement plan which is determined by your date of hire. Your servicing HR office is responsible for determining the applicable retirement plan for you. There are various retirement plans and types the

  7. Quality assurance plan for the Molten Salt Reactor Experiment Remediation Project at the Oak Ridge National Laboratory. Phase 1 -- Interim corrective measures and Phase 2 -- Purge and trap reactive gases

    SciTech Connect (OSTI)

    1995-11-01

    This Quality Assurance Plan (QAP) identifies and describes the systems utilized by the Molten Salt Reactor Experiment Remediation Project (MSRERP) personnel to implement the requirements and associated applicable guidance contained in the Quality Program Description Y/QD-15 Rev. 2 (Energy Systems 1995f). This QAP defines the quality assurance (QA) requirements applicable to all activities and operations in and directly pertinent to the MSRERP Phase 1--Interim Corrective Measures and Phase 2--Purge and Trap objectives. This QAP will be reviewed, revised, and approved as necessary for Phase 3 and Phase 4 activities. This QAP identifies and describes the QA activities and procedures implemented by the various Oak Ridge National Laboratory support organizations and personnel to provide confidence that these activities meet the requirements of this project. Specific support organization (Division) quality requirements, including the degree of implementation of each, are contained in the appendixes of this plan.

  8. Waste Emplacement/Retrieval System Description Document

    SciTech Connect (OSTI)

    2000-10-12

    The Waste Emplacement/Retrieval System transports Waste Packages (WPs) from the Waste Handling Building (WHB) to the subsurface area of emplacement, and emplaces the WPs once there. The system also, if necessary, removes some or all of the WPs from the underground and transports them to the surface. Lastly, the system is designed to remediate abnormal events involving the portions of the system supporting emplacement or retrieval. During emplacement operations, the system operates on the surface between the WHB and North Portal, and in the subsurface in the North Ramp, access mains, and emplacement drifts. During retrieval or abnormal conditions, the operations areas may also extend to a surface retrieval storage site and South Portal on the surface, and the South Ramp in the subsurface. A typical transport and emplacement operation involves the following sequence of events. A WP is loaded into a WP transporter at the WHB, and coupled to a pair of transport locomotives. The locomotives transport the WP from the WHB, down the North Ramp, and to the entrance of an emplacement drift. Once docked at the entrance of the emplacment drift, the WP is moved outside of the WP transporter, and engaged by a WP emplacement gantry. The gantry lifts the WP, and transports it to its emplacement location, where the WP is then lowered to its final resting position. The gantry remains in the drift while the WP transporter is returned to the WHB by the locomotives. When the transporter reaches the WHB, the sequence of operations is repeated. Retrieval of all the WPs, or a large group of WPs, under normal conditions is achieved by reversing the emplacement operations. Retrieval of a small set of WPs, under normal or abnormal conditions, is known as recovery. Recovery performed under abnormal conditions will involve a suite of specialized equipment designed to perform a variety of tasks to enable the recovery process. Recovery after abnormal events may require clearing of equipment

  9. Aerosol Retrievals from ARM SGP MFRSR Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Alexandrov, Mikhail

    2008-01-15

    The Multi-Filter Rotating Shadowband Radiometer (MFRSR) makes precise simultaneous measurements of the solar direct normal and diffuse horizontal irradiances at six wavelengths (nominally 415, 500, 615, 673, 870, and 940 nm) at short intervals (20 sec for ARM instruments) throughout the day. Time series of spectral optical depth are derived from these measurements. Besides water vapor at 940 nm, the other gaseous absorbers within the MFRSR channels are NO2 (at 415, 500, and 615 nm) and ozone (at 500, 615, and 670 nm). Aerosols and Rayleigh scattering contribute atmospheric extinction in all MFRSR channels. Our recently updated MFRSR data analysis algorithm allows us to partition the spectral aerosol optical depth into fine and coarse modes and to retrieve the fine mode effective radius. In this approach we rely on climatological amounts of NO2 from SCIAMACHY satellite retrievals and use daily ozone columns from TOMS.

  10. Bin Set 1 Calcine Retrieval Feasibility Study

    SciTech Connect (OSTI)

    R. D. Adams; S. M. Berry; K. J. Galloway; T. A. Langenwalter; D. A. Lopez; C. M. Noakes; H. K. Peterson; M. I. Pope; R. J. Turk

    1999-10-01

    At the Department of Energy's Idaho Nuclear Technology and Engineering Center, as an interim waste management measure, both mixed high-level liquid waste and sodium bearing waste have been solidified by a calculation process and are stored in the Calcine Solids Storage Facilities. This calcined product will eventually be treated to allow final disposal in a national geologic repository. The Calcine Solids Storage Facilities comprise seven ''bit sets.'' Bin Set 1, the first to be constructed, was completed in 1959, and has been in service since 1963. It is the only bin set that does not meet current safe-shutdown earthquake seismic criteria. In addition, it is the only bin set that lacks built-in features to aid in calcine retrieval. One option to alleviate the seismic compliance issue is to transport the calcine from Bin Set 1 to another bin set which has the required capacity and which is seismically qualified. This report studies the feasibility of retrieving the calcine from Bi n Set 1 and transporting it into Bin Set 6 which is located approximately 650 feet away. Because Bin Set 1 was not designed for calcine retrieval, and because of the high radiation levels and potential contamination spread from the calcined material, this is a challenging engineering task. This report presents preconceptual design studies for remotely-operated, low-density, pneumatic vacuum retrieval and transport systems and equipment that are based on past work performed by the Raytheon Engineers and Constructors architectural engineering firm. The designs presented are considered feasible; however, future development work will be needed in several areas during the subsequent conceptual design phase.

  11. CD DVD Retrieval | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CD DVD Retrieval Publications KMD Contacts Project Summaries EPAct 2005 Arctic Energy Office Announcements Software Stripper Wells The user can download the complete CD/DVD via zip files, or if applicable use the interactive webpages to review the content online. Users can also request mailed copies of the media using the NETL CD-DVD ordering system. CD Image Title: Naturally Fracture Reservoir Simulator: FRACGEN & NFFLOW Info: The DOE sponsored a project to simulate the behavior of tight,

  12. Engineering development of waste retrieval end effectors for the Oak Ridge gunite waste tanks

    SciTech Connect (OSTI)

    Mullen, O.D.

    1997-05-01

    The Gunite and Associated Tanks Treatability Study at Oak Ridge National Laboratory selected the waterjet scarifying end effector, the jet pump conveyance system, and the Modified Light Duty Utility Arm and Houdini Remotely Operated Vehicle deployment and manipulator systems for evaluation. The waterjet-based retrieval end effector had been developed through several generations of test articles targeted at deployment in Hanford underground storage tanks with a large robotic arm. The basic technology had demonstrated effectiveness at retrieval of simulants bounding the foreseen range of waste properties and indicated compatibility with the planned deployment systems. The Retrieval Process Development and Enhancements team was tasked with developing a version of the retrieval end effector tailored to the Oak Ridge tanks, waste and deployment platforms. The finished prototype was delivered to PNNL and subjected to a brief round of characterization and performance testing at the Hydraulic Testbed prior to shipment to Oak Ridge. It has undergone extensive operational testing in the Oak Ridge National Laboratory Tanks Technology Cold Test Facility and performed well, as expected. A second unit has been delivered outfitted with the high pressure manifold.

  13. Microsoft Word - HABAdv #233_System Plan Rev4_Planning Rev5.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Subject: Tank Waste System Plan Rev 4 & Planning for Rev 5 Adopted: June 4, 2010 Page 1 June 4, 2010 Shirley Olinger, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Jane Hedges, Program Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: Tank Waste System Plan Revision 4 and Planning Assumptions for Revision 5 Dear Ms. Olinger and Ms. Hedges, Background Safe tank waste retrieval, treatment

  14. Using ARM Data to Evaluate Satellite Surface Solar Flux Retrievals

    SciTech Connect (OSTI)

    Hinkelman, L.M.; Stackhouse, P.W.; Young, D.F.; Long, C.N.; Rutan, D.

    2005-03-18

    The accurate, long-term radiometric data collected by Atmospheric Radiation Measurement (ARM) has become essential to the evaluation of surface radiation budget data from satellites. Since the spatial and temporal characteristics of data from these two sources are very different, the comparisons are typically made for long-term average values. While such studies provide a general indication of the quality of satellite flux products, more detailed analysis is required to understand specific retrieval algorithm weaknesses. Here we show how data from the ARM shortwave flux analysis (SFA) value added product (VAP) are being used to assess solar fluxes in the Global Energy and Water Cycle Experiment (GEWEX) Surface Radiation Budget (SRB), release 2.5.

  15. Tank waste remediation system retrieval and disposal mission key enabling assumptions

    SciTech Connect (OSTI)

    Baldwin, J.H.

    1998-01-09

    An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed. An analysis of the programmatic, management and technical activities necessary to declare Readiness to Proceed with execution of the mission demonstrates that the system, people, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2002. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed, transfer piping routes were mapped on it, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define work scope in greater detail, cost estimates and associated year by year financial analyses were completed. Personnel training, qualifications, management systems and procedures were reviewed and shown to be in place and ready to support the Phase 1B mission. Key assumptions and risks that could negatively impact mission success were evaluated and appropriate mitigative actions plans were planned and scheduled.

  16. Retrieval of Urban Boundary Layer Structures from Doppler Lidar Data. Part I: Accuracy Assessment

    SciTech Connect (OSTI)

    Xia, Quanxin; Lin, Ching Long; Calhoun, Ron; Newsom, Rob K.

    2008-01-01

    Two coherent Doppler lidars from the US Army Research Laboratory (ARL) and Arizona State University (ASU) were deployed in the Joint Urban 2003 atmospheric dispersion field experiment (JU2003) held in Oklahoma City. The dual lidar data are used to evaluate the accuracy of the four-dimensional variational data assimilation (4DVAR) method and identify the coherent flow structures in the urban boundary layer. The objectives of the study are three-fold. The first objective is to examine the effect of eddy viscosity models on the quality of retrieved velocity data. The second objective is to determine the fidelity of single-lidar 4DVAR and evaluate the difference between single- and dual-lidar retrievals. The third objective is to correlate the retrieved flow structures with the ground building data. It is found that the approach of treating eddy viscosity as part of control variables yields better results than the approach of prescribing viscosity. The ARL single-lidar 4DVAR is able to retrieve radial velocity fields with an accuracy of 98% in the along-beam direction and 80-90% in the cross-beam direction. For the dual-lidar 4DVAR, the accuracy of retrieved radial velocity in the ARL cross-beam direction improves to 90-94%. By using the dual-lidar retrieved data as a reference, the single-lidar 4DVAR is able to recover fluctuating velocity fields with 70-80% accuracy in the along-beam direction and 60-70% accuracy in the cross-beam direction. Large-scale convective roll structures are found in the vicinity of downtown airpark and parks. Vortical structures are identified near the business district. Strong updrafts and downdrafts are also found above a cluster of restaurants.

  17. Radioactive waste shipments to Hanford retrievable storage from Babcock and Wilcox, Leechburg, Pennsylvania

    SciTech Connect (OSTI)

    Duncan, D.R.

    1994-02-14

    This report characterizes, as far as possible, the solid radioactive wastes generated by Babcock and Wilcox`s Park Township Plutonium Facility near Leechburg, Pennsylvania that were sent to retrievable storage at the Hanford Site. Solid waste as defined in this document is any containerized or self-contained material that has been declared waste. The objective is a description of characteristics of solid wastes that are or will be managed by the Restoration and Upgrades Program; gaseous or liquid effluents are discussed only at a summary level This characterization is of particular interest in the planning of transuranic (TRU) waste retrieval operations, including the Waste Receiving and Processing (WRAP) Facility, because Babcock and Wilcox generated greater than 2.5 percent of the total volume of TRU waste currently stored at the Hanford Site.

  18. Tank waste remediation system retrieval and disposal mission phase 1 financial analysis

    SciTech Connect (OSTI)

    Wells, M.W.

    1998-01-09

    The purpose of the Tank Waste Remediation System (TWRS) Retrieval and Disposal Mission Phase 1 Financial Analysis is to provide a quantitative and qualitative cost and schedule risk analysis of HNF-1946, Tank Waste Remediation System Retrieval and Disposal Mission Initial Updated Baseline (Swita et al. 1998). The Updated Baseline (Section 3.0) is compared to the current TWRS Project Multi-Year Work Plan (MYWP) for fiscal year (FY) 1998 and target budgets for FY 1999 through FY 2011 (Section 4.1). The analysis then evaluates the executability of HNF-1946 (Sections 4.2 through 4.5) and recommends a path forward for risk mitigation (Sections 4.6, 4.7, and 5.0). A sound systems engineering approach was applied to understand and analyze the Phase 1B Retrieval and Disposal mission. Program and Level 1 Logics were decomposed to Level 8 of the Work Breakdown Structure (WBS) where logic was detailed, scope was defined, detail durations and estimates prepared, and resource loaded schedules developed. Technical Basis Review (TBR) packages were prepared which include this information and, in addition, defined the enabling assumptions for each task, and the risks associated with performance. This process is discussed in Section 2.1. Detailed reviews at the subactivity within the Level 1 Logic TBR levels were conducted to provide the recommended solution to the Phase 1B Retrieval and Disposal Mission. Independent cost analysis and risk assessments were performed by members of the Lockheed Martin Hanford Corporation (LMHC) Business Management and Chief Financial Officer organization along with specialists in risk analysis from TRW, Inc. and Lockheed Martin Energy Systems. The process evaluated technical, schedule, and cost risk by category (program specific fixed and variable, integrated program, and programmatic) based on risk certainly from high probability well defined to very low probability that is not bounded or priceable as discussed in Section 2.2. The results have been

  19. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Environmental Management (EM)

    ... ideas, consider safe solutions to problems, and use the collective experience ... hazmat security plans; and emergency response planning as required in 49 CFR 173. There ...

  20. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  1. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 ACTION PLAN 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this action plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and the Washington State Hazardous Waste Management Act. All actions required to be taken pursuant to this Agreement shall be taken in accordance

  2. Subsea well with retrievable piping deck

    SciTech Connect (OSTI)

    Pokladnik, R.L.; Valka, W.A.

    1984-03-27

    An apparatus and method for drilling and completing a subsea well located at the seabed using a retrievable piping deck. The apparatus includes a template supported on the seabed, the retrievable piping deck supported on the template, a plurality of wellheads supported on the template and a plurality of Christmas trees supported on the wellheads. The piping deck has preinstalled flow lines and hydraulic lines to conduct well fluid from the Christmas trees to the surface and to conduct hydraulic control fluid from the surface to the trees. In addition to the Christmas trees, a well fluid manifold and a gaseous-liquid component separator can be supported on the template. The fluid connections between the Christmas trees and the hydraulic and flow lines and between the manifold and separator and the hydraulic and flow lines are accomplished by vertically oriented stab-in connectors. After installation of the template and drilling of the wells, the piping deck is lowered independently to the template and coupled thereto and then the Christmas trees and manifold-separator are lowered to the template and into fluid communication with the piping deck hydraulic and flow lines.

  3. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  4. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  5. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 05.18.16 *Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Advice [X] 2. Critical Infrastructure Updates *RAP/HSEP/TWC Advice [X] 3. PFP Progress *RAP/HSEP Agency briefing X 4. Sludge retrieval RAP Agency briefing X 5. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [X] 6. Risk-based retrieval,

  6. Optics Supply Planning System

    SciTech Connect (OSTI)

    Gaylord, J

    2009-04-30

    at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

  7. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain

    2012-07-01

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear

  8. Validation of TES Temperature and Water Vapor Retrievals with...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The primary objective of the TES (Tropospheric Emission Spectrometer) instrument on the Aura spacecraft is the retrieval of trace gases, especially water vapor and ozone. The TES...

  9. Retrieval and Repackaging of RH-TRU Waste - General Presentation...

    Office of Environmental Management (EM)

    Retrieval and Repackaging of RH-TRU Waste- GENERAL PRESENTATION MODULAR HOT CELL TECHNOLOGY AREVA FEDERAL SERVICES - OAK RIDGE, TN - GENERAL PRESENTATION OF MODULAR HOT CELL ...

  10. ARM - Publications: Science Team Meeting Documents: AIRS retrievals...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AIRS retrievals of atmospheric profiles of temperature and humidity - comparisons with radiosondes and ship-based remote sensing during AEROSE Minnett, Peter University of Miami...

  11. Posters Radar/Radiometer Retrievals of Cloud Liquid Water and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for retrieving cloud liquid water content and drizzle characteristics using a K -band Doppler radar (Kropfli et al. 1990) and microwave radiometer (Hogg et al. 1983). The...

  12. Using ARM data to correct plane-parallel satellite retrievals...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Using ARM data to correct plane-parallel satellite retrievals of cloud properties Dong, Xiquan University of North Dakota Minnis, Patrick NASA Langley Research Center Xi, Baike...

  13. Detecting Cirrus-Overlapping-Water Clouds and Retrieving their...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clouds and Retrieving their Optical Properties Using MODIS Data F.-L. Chang and Z. Li Earth System Science Interdisciplinary Center University of Maryland College...

  14. Modification and Application of a New Method for Retrieving Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of a New Method for Retrieving Water-Cloud Microphysics Vertical Profile F.-L Chang and Z. Li Earth System Science Interdisciplinary Center University of Maryland College...

  15. Retrieval Of Final Stored Radioactive Waste Resumes | Department...

    Office of Environmental Management (EM)

    Among the extensive engineered controls that have been put in place to protect workers is the Retrieval Containment Enclosure wall that isolates the remaining waste from the rest ...

  16. MBL Drizzle Properties and Their Impact on Cloud Property Retrieval

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    layer drizzle properties and their impact on cloud property retrieval." Atmospheric Measurement Techniques, 8, doi:10.5194amt-8-3555-2015. Contributors Xiquan Dong,...

  17. Engineer/constructor description of work for Tank 241-SY-102 retrieval system, project W-211, initial tank retrieval systems

    SciTech Connect (OSTI)

    Rieck, C.A.

    1996-02-01

    This document provides a description of work for the design and construction of a waste retrieval system for Tank 241-SY-102. The description of work includes a working estimate and schedule, as well as a narrative description and sketches of the waste retrieval system. The working estimate and schedule are within the established baselines for the Tank 241-SY-102 retrieval system. The technical baseline is provided in Functional Design Criteria, WHC-SD-W211-FDC-001, Revision 2.

  18. Techniques for Intravascular Foreign Body Retrieval

    SciTech Connect (OSTI)

    Woodhouse, Joe B.; Uberoi, Raman

    2013-08-01

    As endovascular therapies increase in frequency, the incidence of lost or embolized foreign bodies is increasing. The presence of an intravascular foreign body (IFB) is well recognized to have the potential to cause serious complications. IFB can embolize and impact critical sites such as the heart, with subsequent significant morbidity or mortality. Intravascular foreign bodies most commonly result from embolized central line fragments, but they can originate from many sources, both iatrogenic and noniatrogenic. The percutaneous approach in removing an IFB is widely perceived as the best way to retrieve endovascular foreign bodies. This minimally invasive approach has a high success rate with a low associated morbidity, and it avoids the complications related to open surgical approaches. We examined the characteristics, causes, and incidence of endovascular embolizations and reviewed the various described techniques that have been used to facilitate subsequent explantation of such materials.

  19. Storage and retrieval of large digital images

    DOE Patents [OSTI]

    Bradley, J.N.

    1998-01-20

    Image compression and viewing are implemented with (1) a method for performing DWT-based compression on a large digital image with a computer system possessing a two-level system of memory and (2) a method for selectively viewing areas of the image from its compressed representation at multiple resolutions and, if desired, in a client-server environment. The compression of a large digital image I(x,y) is accomplished by first defining a plurality of discrete tile image data subsets T{sub ij}(x,y) that, upon superposition, form the complete set of image data I(x,y). A seamless wavelet-based compression process is effected on I(x,y) that is comprised of successively inputting the tiles T{sub ij}(x,y) in a selected sequence to a DWT routine, and storing the resulting DWT coefficients in a first primary memory. These coefficients are periodically compressed and transferred to a secondary memory to maintain sufficient memory in the primary memory for data processing. The sequence of DWT operations on the tiles T{sub ij}(x,y) effectively calculates a seamless DWT of I(x,y). Data retrieval consists of specifying a resolution and a region of I(x,y) for display. The subset of stored DWT coefficients corresponding to each requested scene is determined and then decompressed for input to an inverse DWT, the output of which forms the image display. The repeated process whereby image views are specified may take the form an interaction with a computer pointing device on an image display from a previous retrieval. 6 figs.

  20. Storage and retrieval of large digital images

    DOE Patents [OSTI]

    Bradley, Jonathan N.

    1998-01-01

    Image compression and viewing are implemented with (1) a method for performing DWT-based compression on a large digital image with a computer system possessing a two-level system of memory and (2) a method for selectively viewing areas of the image from its compressed representation at multiple resolutions and, if desired, in a client-server environment. The compression of a large digital image I(x,y) is accomplished by first defining a plurality of discrete tile image data subsets T.sub.ij (x,y) that, upon superposition, form the complete set of image data I(x,y). A seamless wavelet-based compression process is effected on I(x,y) that is comprised of successively inputting the tiles T.sub.ij (x,y) in a selected sequence to a DWT routine, and storing the resulting DWT coefficients in a first primary memory. These coefficients are periodically compressed and transferred to a secondary memory to maintain sufficient memory in the primary memory for data processing. The sequence of DWT operations on the tiles T.sub.ij (x,y) effectively calculates a seamless DWT of I(x,y). Data retrieval consists of specifying a resolution and a region of I(x,y) for display. The subset of stored DWT coefficients corresponding to each requested scene is determined and then decompressed for input to an inverse DWT, the output of which forms the image display. The repeated process whereby image views are specified may take the form an interaction with a computer pointing device on an image display from a previous retrieval.

  1. EMSL Contribution Plan

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-12-01

    This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2

  2. Secure Retrieval of FFTF Testing, Design, and Operating Information

    SciTech Connect (OSTI)

    Butner, R. Scott; Wootan, David W.; Omberg, Ronald P.; Makenas, Bruce J.; Nielsen, Deborah

    2009-10-01

    . Accomplishments include secure retrieval of: more than 400 boxes of FFTF information, several hundred microfilm reels including Clinch River Breeder Reactor (CRBR) information, and 40 boxes of information on the Fuels and Materials Examination Facility (FMEF). All information preserved to date is now being stored and categorized consistent with the IAEA international standardized taxonomy. Earlier information largely related to irradiation testing is likewise being categorized. The fuel test results information exists in several different formats depending upon the final stage of the test evaluation. In some cases there is information from both non-destructive and destructive examination while in other cases only non-destructive results are available. Non-destructive information would include disassembly records, dimensional profilometry, gamma spectrometry, and neutron radiography. Information from destructive examinations would include fission gas analysis, metallography, and photomicrographs. Archiving of FFTF data, including both the reactor plant and the fuel test information, is being performed in coordination with other data archiving efforts underway under the aegis of the AFCI program. In addition to the FFTF efforts, archiving of data from the EBR-II reactor is being carried out by INL. All material at risk associated with FFTF documentation has been secured in a timely manner consistent with the stated plan. This documentation is now being categorized consistent with internationally agreed upon IAEA standards. Documents are being converted to electronic format for transfer to a large searchable electronic database being developed by INL. In addition, selected FFTF information is being used to generate test cases for large-scale simulation modeling efforts and for providing Design Data Need (DDN) packages as requested by the AFCI program.

  3. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through The Hartford. These income protection plans will pay a percentage of your salary when you are unable to work due to illness or injury. Resources STD highlight sheet ...

  4. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of financial resources and the latest financial tools to make saving for retirement easy. ... This plan allows you to save and invest a piece of your paycheck before taxes are taken ...

  5. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  6. Integration of Biodiversity into National Forestry Planning:...

    Open Energy Info (EERE)

    Biodiversity into National Forestry Planning: An Annotated Bibliography of Web-Based Resources, Methods, Experiences, and Case Studies Jump to: navigation, search Tool Summary...

  7. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    SciTech Connect (OSTI)

    BURKE CA; LANDON MR; HANSON CE

    2012-01-30

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  8. DEVELOPMENT AND DEPLOYMENT OF THE MOBILE ARM RETRIEVAL SYSTEM (MARS) - 12187

    SciTech Connect (OSTI)

    BURKE CA; LANDON MR; HANSON CE

    2011-11-08

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are beinglhave been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012.

  9. Development and Deployment of the Mobile Arm Retrieval System (MARS) - 12187

    SciTech Connect (OSTI)

    Burke, Christopher A.; Landon, Matthew R.; Hanson, Carl E.

    2012-07-01

    Washington River Protection Solutions (WRPS) is developing and deploying Mobile Arm Retrieval System (MARS) technologies solutions to support retrieval of radioactive and chemical waste from underground single shell storage tanks (SST) located at the Hanford Site, which is near Richland, Washington. WRPS has developed the MARS using a standardized platform that is capable of deploying multiple retrieval technologies. To date, WRPS, working with their mentor-protege company, Columbia Energy and Environmental Services (CEES), has developed two retrieval mechanisms, MARS-Sluicing (MARS-S) and MARS-Vacuum (MARS-V). MARS-S uses pressurized fluids routed through spray nozzles to mobilize waste materials to a centrally located slurry pump (deployed in 2011). MARS-V uses pressurized fluids routed through an eductor nozzle. The eductor nozzle allows a vacuum to be drawn on the waste materials. The vacuum allows the waste materials to be moved to an in-tank vessel, then extracted from the SST and subsequently pumped to newer and safer double shell tanks (DST) for storage until the waste is treated for disposal. The MARS-S system is targeted for sound SSTs (i.e., non leaking tanks). The MARS-V is targeted for assumed leaking tanks or those tanks that are of questionable integrity. Both versions of MARS are being/have been developed in compliance with WRPS's TFC-PLN-90, Technology Development Management Plan [1]. TFC-PLN-90 includes a phased approach to design, testing, and ultimate deployment of new technologies. The MARS-V is scheduled to be deployed in tank 241-C-105 in late 2012. (authors)

  10. High performance gamma measurements of equipment retrieved from Hanford high-level nuclear waste tanks

    SciTech Connect (OSTI)

    Troyer, G.L.

    1997-03-17

    The cleanup of high level defense nuclear waste at the Hanford site presents several progressive challenges. Among these is the removal and disposal of various components from buried active waste tanks to allow new equipment insertion or hazards mitigation. A unique automated retrieval system at the tank provides for retrieval, high pressure washing, inventory measurement, and containment for disposal. Key to the inventory measurement is a three detector HPGe high performance gamma spectroscopy system capable of recovering data at up to 90% saturation (200,000 counts per second). Data recovery is based on a unique embedded electronic pulser and specialized software to report the inventory. Each of the detectors have different shielding specified through Monte Carlo simulation with the MCNP program. This shielding provides performance over a dynamic range of eight orders of magnitude. System description, calibration issues and operational experiences are discussed.

  11. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 Work Plan Working draft - reflects comments received from PIC, HSEP, TWC and RAP committees (updated October 22, 2015) 1 Hanford Advisory Board Draft Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area

  12. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  13. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  14. AMIE (ACRF MJO Investigation Experiment)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AMIE (ACRF MJO Investigation Experiment) Planning Meeting AMIE Science Steering Committee Chuck Long, Tony DelGenio, Bill Gustafson, Bob Houze, Mike Jensen, Steve Klein, Ruby...

  15. Information retrieval system: impacts of water-level changes on uses of federal storage reservoirs of the Columbia River.

    SciTech Connect (OSTI)

    Fickeisen, D.H.; Cowley, P.J.; Neitzel, D.A.; Simmons, M.A.

    1982-09-01

    A project undertaken to provide the Bonneville Power Administration (BPA) with information needed to conduct environmental assessments and meet requirements of the National Environmental Policy Act (NEPA) and the Pacific Northwest Electric Power Planning and Conservation Act (Regional Act) is described. Access to information on environmental effects would help BPA fulfill its responsibilities to coordinate power generation on the Columbia River system, protect uses of the river system (e.g., irrigation, recreation, navigation), and enhance fish and wildlife production. Staff members at BPA identified the need to compile and index information resources that would help answer environmental impact questions. A computer retrieval system that would provide ready access to the information was envisioned. This project was supported by BPA to provide an initial step toward a compilation of environmental impact information. Scientists at Pacific Northwest Laboratory (PNL) identified, gathered, and evaluated information related to environmental effects of water level on uses of five study reservoirs and developed and implemented and environmental data retrieval system, which provides for automated storage and retrieval of annotated citations to published and unpublished information. The data retrieval system is operating on BPA's computer facility and includes the reservoir water-level environmental data. This project was divided into several tasks, some of which were conducted simultaneously to meet project deadlines. The tasks were to identify uses of the five study reservoirs, compile and evaluate reservoir information, develop a data entry and retrieval system, identify and analyze research needs, and document the data retrieval system and train users. Additional details of the project are described in several appendixes.

  16. Mixer pump test plan for double shell tank AZ-101

    SciTech Connect (OSTI)

    STAEHR, T.W.

    1999-05-12

    Mixer pump systems have been chosen as the method for retrieval of tank wastes contained in double shell tanks at Hanford. This document describes the plan for testing and demonstrating the ability of two 300 hp mixer pumps to mobilize waste in tank AZ-101. The mixer pumps, equipment and instrumentation to monitor the test were installed by Project W-151.

  17. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  18. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  19. Tank waste remediation system retrieval and disposal mission key enabling assumptions

    SciTech Connect (OSTI)

    Baldwin, J.H.

    1998-01-05

    An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. The review showed that since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farm structure and configurations and work scope and costs has been established itself as part of the culture within TWRS. An analysis of the programmatic, management and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, people and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal mission requirements and evaluating the readiness of the TWRS contractor to supply waste feed to the private contractors in June 2OO2. The Phase 1 feed delivery requirements from the Private Contractor Request for Proposals were reviewed. Transfer piping routes were mapped out, existing systems were evaluated, and upgrade requirements were defined. Technical Basis Reviews were completed to define work scope in greater detail, cost estimates and associated year by year financial analyses were completed. TWRS personnel training, qualifications, management systems and procedures were reviewed and shown to be in place and ready to support the Phase 1B mission. Key assumptions and risks that could negatively impact mission success were evaluated and appropriate mitigative actions plans were planned and scheduled.

  20. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  1. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  2. ARM - PI Product - Cloud Property Retrieval Products for Graciosa Island,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Azores ProductsCloud Property Retrieval Products for Graciosa Island, Azores ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Cloud Property Retrieval Products for Graciosa Island, Azores [ research data - ASR funded ] The motivation for developing this product was to use the Dong et al. 1998 method to retrieve cloud microphysical properties, such as cloud droplet effective radius, cloud droplets

  3. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    SciTech Connect (OSTI)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  4. Project management plan for project W-320, tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Leliefeld, K.W.

    1996-02-02

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  5. Plan Your Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visit Plan your visit to the museum Experience 40 interactive exhibits revealing nuclear defense history and the research in life sciences, material sciences, space, supercomputing, energy and the environment. August 18, 2014 Visitor in an interactive exhibit Contact Us thumbnail of Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Bradbury Science Museum, 1350 Central Avenue Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Open every day except Thanksgiving, Christmas, and New

  6. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sectors. BBEE programs are growing in prominence around the country, using a substantial body of knowledge and experience associated with behavior change that is rooted in the...

  7. Slurry Retrieval, Pipeline Transport & Plugging and Mixing Workshop

    Office of Environmental Management (EM)

    Gary L. Smith - Office of Waste Processing (EM-21) Slurry Retrieval, Pipeline Transport & Plugging and Mixing Workshop 1 Dr. Gary L. Smith - Office of Waste Processing (EM-21) Dr. ...

  8. Environmental impacts of proposed Monitored Retrievable Storage. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-12-17

    This report describes environmental impacts from a proposed monitored retrievable storage facility for spent fuels to be located in Tennessee. Areas investigated include: water supply, ground water, air quality, solid waste management, and health hazards. (CBS)

  9. ARM Cloud Retrieval Ensemble Data Set (ACRED) (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: ARM Cloud Retrieval Ensemble Data Set (ACRED) ... This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and ...

  10. Joint retrievals of cloud and drizzle in marine boundary layer...

    Office of Scientific and Technical Information (OSTI)

    Specifically, the vertical structure of droplet size and water content of both cloud and ... cumulus under stratocumulus, where cloud water path is retrieved with an error of 31 g ...

  11. Innovative Idaho Site Crews Find Ways to Make Waste Retrieval...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    crews safely remove the final box from Pad 1, Cell 2 located in the Transuranic Storage Area Retrieval Enclosure. On the left, the original box was degraded and could not be ...

  12. ARM - Evaluation Product - MWR Retrievals of Cloud Liquid Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ProductsMWR Retrievals of Cloud Liquid Water and Water Vapor ARM Data Discovery Browse Data Documentation Use the Data File Inventory tool to view data availability at the file...

  13. Retrieval/ex situ thermal treatment scoring interaction report

    SciTech Connect (OSTI)

    Raivo, B.D.; Richardson, J.G.

    1993-11-01

    A retrieval/ex situ thermal treatment technology process for the Idaho National Engineering Laboratory transuranic waste pits and trenches is present. A system performance score is calculated, and assumptions, requirements, and reference baseline technologies for all subelements are included.

  14. Cloud Property Retrieval Products for Graciosa Island, Azores...

    Office of Scientific and Technical Information (OSTI)

    We had been using this method to retrieve cloud microphysical properties over ARM SGP and NSA sites. We also modified the method for the AMF at Shouxian, China and some IOPs, e.g. ...

  15. EM's Office of River Protection Completes Waste Retrieval in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retrieval activities began in April 2014 using an enhanced-reach sluicer, a tool lowered into the underground tank that sprays liquid, mainly recycled waste, through a nozzle at ...

  16. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  17. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  18. Consistent satellite XCO2 retrievals from SCIAMACHY and GOSAT using the BESD algorithm

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Heymann, J.; Reuter, M.; Hilker, M.; Buchwitz, M.; Schneising, O.; Bovensmann, H.; Burrows, J. P.; Kuze, A.; Suto, H.; Deutscher, N. M.; et al

    2015-02-13

    due to a still non-perfect BESD retrieval algorithm, which will be continuously improved in the future. Our overarching goal is to generate a satellite-derived XCO2 data set appropriate for climate and carbon cycle research covering the longest possible time period. We therefore also plan to extend the existing SCIAMACHY and GOSAT data set discussed here by using also data from other missions (e.g., OCO-2, GOSAT-2, CarbonSat) in the future.« less

  19. SNF fuel retrieval sub project safety analysis document

    SciTech Connect (OSTI)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  20. Hanford Tank Waste Retrieval, Treatment, and Disposition Framework |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hanford Tank Waste Retrieval, Treatment, and Disposition Framework Hanford Tank Waste Retrieval, Treatment, and Disposition Framework Forty years of plutonium production at the Hanford Site has yielded a challenging nuclear waste legacy approximately 56 million gallons of radioactive and chemical wastes stored in 177 underground tanks (tank farms) located on Hanford's Central Plateau. The mission of the U.S. Department of Energy (DOE) Office of River Protection (ORP) is

  1. Visualizing and improving the robustness of phase retrieval algorithms

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Tripathi, Ashish; Leyffer, Sven; Munson, Todd; Wild, Stefan M.

    2015-06-01

    Coherent x-ray diffractive imaging is a novel imaging technique that utilizes phase retrieval and nonlinear optimization methods to image matter at nanometer scales. We explore how the convergence properties of a popular phase retrieval algorithm, Fienup's HIO, behave by introducing a reduced dimensionality problem allowing us to visualize and quantify convergence to local minima and the globally optimal solution. We then introduce generalizations of HIO that improve upon the original algorithm's ability to converge to the globally optimal solution.

  2. An Evaluation of MWR Retrievals of Liquid Water Path

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evaluation of MWR Retrievals of Liquid Water Path and Precipitable Water Vapor R. T. Marchand and T. P. Ackerman Pacific Northwest National Laboratory Richland, Washington Introduction This paper offers some observations on the quality of Microwave Radiometer (MWR) retrievals of precipitable water vapor (PWV) and liquid water path (LWP). The paper shows case study comparisons between the standard "statistical" approach and those obtained using an iterative solution of the microwave

  3. Laboratory issues statement on Los Alamos historical document retrieval and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assessment report Historical document retrieval and assessment report Laboratory issues statement on Los Alamos Historical Document Retrieval and Assessment report This is an important document, and we take it seriously. June 25, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  4. TWP-ICE Operations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Plan Peter May, Jim Mather, Christian Jakob, Jay Mace, Greg McFarquhar With contributions from many people Overview The TWPICE experiment will take place from January 21, 2006 through February 13, 2006. During this period, there will be a substantial ground and sea based component as well as NASA, ARM, ARA and UK aircraft. The UK aircraft will also be participating in an experiment in Darwin during November- December 2005. This earlier experiment also involves aircraft associated with

  5. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  6. Cloud Property Retrieval Products for Graciosa Island, Azores

    SciTech Connect (OSTI)

    Dong, Xiquan

    2014-05-05

    The motivation for developing this product was to use the Dong et al. 1998 method to retrieve cloud microphysical properties, such as cloud droplet effective radius, cloud droplets number concentration, and optical thickness. These retrieved properties have been used to validate the satellite retrieval, and evaluate the climate simulations and reanalyses. We had been using this method to retrieve cloud microphysical properties over ARM SGP and NSA sites. We also modified the method for the AMF at Shouxian, China and some IOPs, e.g. ARM IOP at SGP in March, 2000. The ARSCL data from ARM data archive over the SGP and NSA have been used to determine the cloud boundary and cloud phase. For these ARM permanent sites, the ARSCL data was developed based on MMCR measurements, however, there were no data available at the Azores field campaign. We followed the steps to generate this derived product and also include the MPLCMASK cloud retrievals to determine the most accurate cloud boundaries, including the thin cirrus clouds that WACR may under-detect. We use these as input to retrieve the cloud microphysical properties. Due to the different temporal resolutions of the derived cloud boundary heights product and the cloud properties product, we submit them as two separate netcdf files.

  7. Cloud Property Retrieval Products for Graciosa Island, Azores

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Dong, Xiquan

    The motivation for developing this product was to use the Dong et al. 1998 method to retrieve cloud microphysical properties, such as cloud droplet effective radius, cloud droplets number concentration, and optical thickness. These retrieved properties have been used to validate the satellite retrieval, and evaluate the climate simulations and reanalyses. We had been using this method to retrieve cloud microphysical properties over ARM SGP and NSA sites. We also modified the method for the AMF at Shouxian, China and some IOPs, e.g. ARM IOP at SGP in March, 2000. The ARSCL data from ARM data archive over the SGP and NSA have been used to determine the cloud boundary and cloud phase. For these ARM permanent sites, the ARSCL data was developed based on MMCR measurements, however, there were no data available at the Azores field campaign. We followed the steps to generate this derived product and also include the MPLCMASK cloud retrievals to determine the most accurate cloud boundaries, including the thin cirrus clouds that WACR may under-detect. We use these as input to retrieve the cloud microphysical properties. Due to the different temporal resolutions of the derived cloud boundary heights product and the cloud properties product, we submit them as two separate netcdf files.

  8. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide. In his

  9. Note: Phase retrieval method for analyzing single-phase displacement interferometry data

    SciTech Connect (OSTI)

    Chen, X. H.; Zeng, X. L.; Fan, D.; Liu, Q. C.; Bie, B. X.; Zhou, X. M. Luo, S. N.

    2014-02-15

    We present a phase retrieval method (PRM) for analyzing single-phase displacement interferometry measurements on rapidly changing velocity histories, including photon Doppler velocimetry (PDV). PRM identifies the peaks and valleys as well as zero-crossing points in a PDV time series, performs normalization and extracts point-by-point phase and thus velocity information. PRM does not require a wide time window as in sliding window Fourier transformation, and thus improves the effective temporal resolution. This method is implemented in analyzing PDV data obtained from gas gun experiments, and validated against simultaneous measurements with velocity interferometer system for any reflector.

  10. ARM: Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Maria Cadeddu

    2004-02-19

    Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

  11. ARM: Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Maria Cadeddu

    Microwave Radiometer data (MWR Profiles - QME), water vapor, temp, cloud liquid water, precip water retrievals

  12. Tank waste remediation system engineering plan

    SciTech Connect (OSTI)

    Rifaey, S.H.

    1998-01-09

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

  13. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 24, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Informational x x 2. 100 D/H Proposed Plan RAP Informational x x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. 324 Waste Sites RAP Informational 5. 618-10 VPU remediation RAP Informational 6. Central Plateau Inner Area Guidelines RAP Informational x 7. ERDF RAP

  14. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adopted by the Hanford Advisory Board on 11/5/2015, updated 12/21/15 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview and RAP Issue Manager Assignments) Topic Committee Assignment Issue Managers (lead noted in bold) Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Mattson, Suyama x 2. 100 D/H Proposed Plan RAP Engstrom, Mattson, Garnant, Leckband x 3. 100-N Proposed Plan RAP Cimon, Mattson x 4. Central Plateau Inner Area Guidelines RAP Cimon, Catrell,

  15. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2015June 18, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  16. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated December 21, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  17. Tank Waste Retrieval Lessons Learned at the Hanford Site

    SciTech Connect (OSTI)

    Dodd, R.A.

    2008-07-01

    One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA

  18. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    SciTech Connect (OSTI)

    KIRKBRIDE, R.A.

    2000-04-19

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

  19. Innovative Idaho Site Crews Find Ways to Make Waste Retrieval Safer, More

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficient | Department of Energy Innovative Idaho Site Crews Find Ways to Make Waste Retrieval Safer, More Efficient Innovative Idaho Site Crews Find Ways to Make Waste Retrieval Safer, More Efficient June 30, 2015 - 12:00pm Addthis Advanced Mixed Waste Treatment Project retrieval crews safely remove the final box from Pad 1, Cell 2 located in the Transuranic Storage Area Retrieval Enclosure. On the left, the original box was degraded and could not be retrieved intact, so crews removed its

  20. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  1. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  2. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  3. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  4. DOE CONTRACTOR PENSION PLANS

    Broader source: Energy.gov (indexed) [DOE]

    ... plan(s) to maximize the contribution predictability (i.e. forecasting accuracy) and contain current and future costs, to include rationale for selection of all plan assumptions ...

  5. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    SciTech Connect (OSTI)

    Berglin, E.J.

    1998-02-05

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  6. TANK FARM RETRIEVAL LESSONS LEARNED AT THE HANFORD SITE

    SciTech Connect (OSTI)

    DODD RA

    2008-01-22

    One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST saltcake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the TriParty Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U. S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 fe in 530,000 gallon or larger tanks; 30 fe in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an

  7. Memorandum of understanding for the TWRS characterization retrieval project

    SciTech Connect (OSTI)

    JO, J.

    1999-02-24

    During fiscal year 1999, various programs and projects will require analyses from the 222-S Laboratory. In order to prioritize and successfully meet the analytical demands of all the customers, multiple organizations across the Tank Waste Remediation System (TWRS) must work together. One of the projects that will require analyses from the 222-S Laboratory is the retrieval project. Successful completion of retrieval project objectives requires cooperation among four TWRS organizations. The requirements and expectations regarding retrieval project analytical work were examined in order to define roles and responsibilities for each of these TWRS organizations. This memorandum of understanding (MOU) documents the results of this review and establishes the roles and responsibilities. This MOU is subdivided into three sections, the first of which is this introduction. Section 2 provides a summary of the overall roles and responsibilities with respect to retrieval project analytical work for the four TWRS organizations involved. The final section describes the individual interfaces involved in performing retrieval project analytical work, and discusses the roles and responsibilities with respect to each individual interface.

  8. SLUDGE RETRIEVAL FROM HANFORD K WEST BASIN SETTLER TANKS

    SciTech Connect (OSTI)

    ERPENBECK EG; LESHIKAR GA

    2011-01-13

    In 2010, an innovative, remotely operated retrieval system was deployed to successfully retrieve over 99.7% of the radioactive sludge from ten submerged tanks in Hanford's K-West Basin. As part of K-West Basin cleanup, the accumulated sludge needed to be removed from the 0.5 meter diameter by 5 meter long settler tanks and transferred approximately 45 meters to an underwater container for sampling and waste treatment. The abrasive, dense, non-homogeneous sludge was the product of the washing process of corroded nuclear fuel. It consists of small (less than 600 micron) particles of uranium metal, uranium oxide, and various other constituents, potentially agglomerated or cohesive after 10 years of storage. The Settler Tank Retrieval System (STRS) was developed to access, mobilize and pump out the sludge from each tank using a standardized process of retrieval head insertion, periodic high pressure water spray, retraction, and continuous pumping of the sludge. Blind operations were guided by monitoring flow rate, radiation levels in the sludge stream, and solids concentration. The technology developed and employed in the STRS can potentially be adapted to similar problematic waste tanks or pipes that must be remotely accessed to achieve mobilization and retrieval of the sludge within.

  9. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 2: Solid waste retrieval facilities -- Phase 1, detail design drawings

    SciTech Connect (OSTI)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 2 provides the complete set of the Detail Design drawings along with a listing of the drawings. Once approved by WHC, these drawings will be issued and baselined for the Title 3 construction effort.

  10. Advanced Waste Retrieval System. Innovative Technology Summary Report

    SciTech Connect (OSTI)

    2001-09-01

    At West Valley, following the baseline removal operations, bulk waste retrieval methods may be augmented if required, with the deployment of the Advanced Waste Retrieval System (AWRS). The AWRS is a hydraulic boom mounted on a trolley on the Mast-Mounted Tool Delivery System. The boom is about 15 ft long with a pan and tilt mechanism at the end. On the end is a steam jet with a suction tool that can reach down around the tank internal structure and vacuum up zeolite or sludge off the bottom of the tank from a thirty-foot diameter reach. A grinder is included topside in the discharge path to pulverize the zeolite so it can be readily retrieved from the destination tank.