Powered by Deep Web Technologies
Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

E-Print Network 3.0 - avec audition publique Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

audition publique Search Powered by Explorit Topic List Advanced Search Sample search results for: avec audition publique Page: << < 1 2 3 4 5 > >> 1 COMPORTEMENT DES AUDITES DANS...

2

Energy Audit Results for Residential Building Energy Efficiency  

E-Print Network (OSTI)

Energy Audit Results for Residential Building Energy Efficiency Forrest City Phases I and II This report analyses complete energy audit results from 28 homes within the Forest City residential complex. Relationships between temperature, humidity, comfort, and energy consumption are detailed. Recommendations

3

Changes in environmental auditing resulting from ISO 14000  

SciTech Connect

With the adoption of ISO 14000 a significant new element has been introduced into the environmental programs in the workplace. This element is the ISO management system. The management system provides a structure and process to control all aspects of the environmental program, and provide management with the information they need to set priorities and make decisions on the business`s operations. The ISO 14000 management system consists of four elements in a continuous cycle of Plan-Do-Check-Act and it acts as an umbrella process to integrate all the aspects of the company`s environmental management and control system into a cohesive program that provides management with: the information they need to make decisions, a way of verifying that the decisions are having the desired effect, and a process to continuously improve on environmental performance. A significant component of the Check element of the ISO management system cycle is the audit program. This program provides management with information on; the completeness of the environmental programs in place, the adequacy of the resources in place to manage environmental performance, the level of implementation of the environmental programs, and the degree of compliance with the company`s standards and the applicable regulations. The audit program must be managed the same as any other of the components of the environmental program and it is made up of several components, including: Audit Management Process and Resources; Conducting the Audits; Auditor Training; Audit Protocols; Audit Reporting Structure; Corrective Action Development, Reporting and Monitoring; Feedback System; Management Reporting Structure; and Program Quality Assurance. While the audit program is only one element of a complete environmental program, no program is complete without an effective audit function.

Sanderson, J. [Nova Corp., Calgary, Alberta (Canada)

1997-12-31T23:59:59.000Z

4

Download  

Science Journals Connector (OSTI)

stability. These background measurements were subtracted from the experimental results to account .... spherical (bubbles and other small hydrosols) and non-.

2007-12-18T23:59:59.000Z

5

Download  

Science Journals Connector (OSTI)

The analytical results support the view that boron is ... ments have radioactive isotopes which could eventually find .... lqor the involatile clement determination.

6

Download  

Science Journals Connector (OSTI)

Jan 19, 1978 ... winds. This upwelling coincides with re- duced river flow into estuaries bordering the ocean. As a result ... industrialized with pulp mills, forest-.

2000-01-09T23:59:59.000Z

7

Download  

Science Journals Connector (OSTI)

chloride and calcium ions on complex formation of Cd-EDTA in sodium chloride solutions has been investigated and the results indicate that the degree of ...

2000-02-14T23:59:59.000Z

8

Download  

Science Journals Connector (OSTI)

cold water mass midway out on the shelf and a warm water mass near the shelf edge. Occasional shifts in location of these masses result in wide temperature ...

9

Download  

Science Journals Connector (OSTI)

Wild Life Management,. Rhodesia ... and turbines results in considerable varia- ..... while for the remaining months of the year ..... mary source of this gas.

2000-02-13T23:59:59.000Z

10

Download  

Science Journals Connector (OSTI)

marine fishcrics science results as much from differing management ... vative. Fisheries managers need to under- ... parative approach has been used with es-.

2000-03-03T23:59:59.000Z

11

Download  

Science Journals Connector (OSTI)

Oct 22, 1982 ... from the Kruskal-Wallis test relating bird densities to prey patch classes. Deleting these data did not change the results. More murres.

2000-02-09T23:59:59.000Z

12

Download  

Science Journals Connector (OSTI)

Rhode Island and Massachusetts coast. It ... the seasonal changes in solar radiation, air Narragansett Bay and the ... of solar heating had resulted in a thicker.

2000-02-13T23:59:59.000Z

13

Download  

Science Journals Connector (OSTI)

Norw. North Polar. Exped., 1893-1896, Sci. Results 5(16): l-22. RODHE, W. 1955. Can plankton production pro- ceed during winter darkness in subarctic lakes?

1999-12-25T23:59:59.000Z

14

Download  

Science Journals Connector (OSTI)

migrated toward the anode and different mo- bilities frequently resulted in fractionation of mixtures of different genera. Organic debris, clay particles, and bacteria ...

1999-12-25T23:59:59.000Z

15

Download  

Science Journals Connector (OSTI)

productivity as a result of the reduced vertical mixing, occurred both in Lake Tanganyika and in ..... over the past century, and the earth's energy imbalance is.

2009-10-26T23:59:59.000Z

16

Download  

Science Journals Connector (OSTI)

in total darkness (Kruskal-Wallis, P = 0.37). The results of this experiment in the plank- ton tower show no influence of internal rhythms on DVM behavior.

17

Download  

E-Print Network (OSTI)

Aug 15, 2008 ... We build on this observation and design a MILP model to find better disjunctions. ...... while the vertical axis reports the sum of the positive (broken line) ... lation drastically resulting in a huge computational overhead which is ...

2008-08-15T23:59:59.000Z

18

Download  

Science Journals Connector (OSTI)

a high-volume, battery-powered bilge pump to sample 10 liters of water at 1 -m .... scales and in the presence of strong thermal stratification. The results also ...

2000-03-10T23:59:59.000Z

19

Download  

Science Journals Connector (OSTI)

The reservoir is the most upstream in a cascade of three reservoirs referred to as the Hells ...... error bars indicate the results of different gas-transfer models (see text). Fmix error bars indicate ..... properties in a natural system. Proceedings of ...

2007-08-13T23:59:59.000Z

20

E-Print Network 3.0 - audit mheausers manual Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

08... .1 Audit Requirement 2.2 Role of the Auditor Page 3 Page 3 Page 3 3. Procedure 3.1 Auditor Qualifications 3... .2 Audit Plan 3.3 Physical Audit Process 3.4 Audit Findings...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Audit Manual (Release 8)  

Energy Savers (EERE)

on prior audit recommendations. However, OA auditors should exercise due professional care by ensuring that they have considered the results of prior audit work and have...

22

The Results (Lessons Learned) of More than 110 Energy Audits for Manufacturers by the Louisiana Industrial Assessment Center  

E-Print Network (OSTI)

This paper and discussion presents the summary and results of energy audits or assessments conducted by the University of Louisiana Lafayette Industrial Assessment Center, which is sponsored by the US Department of Energy, for the first four years...

Kozman, T.; Davies, T.; Reynolds, C.; O'Quin, R.; DaCosta, J.; Galti, T.; Pechon, C.; Stutes, K.

2005-01-01T23:59:59.000Z

23

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing  

E-Print Network (OSTI)

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing

Colorado at Boulder, University of

24

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing  

E-Print Network (OSTI)

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing

Colorado at Boulder, University of

25

E-Print Network 3.0 - audit tool odit Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Sciences, Texas Tech University Collection: Biology and Medicine 15 Auditing in Egypt: A Study of Challenges, Problems, and Possibility of an Automatic Formulation of the...

26

E-Print Network 3.0 - audit code frapcon Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

of Mathematics, University of Western Ontario Collection: Mathematics 25 Auditing in Egypt: A study of the legal Framework and professional standards Summary: code of ethics of...

27

E-Print Network 3.0 - audit fees evidence Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Alberta Collection: Chemistry ; Biology and Medicine 2 Auditing in Egypt: A Study of Challenges, Problems, and Possibility of an Automatic Formulation of the...

28

E-Print Network 3.0 - audits Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Source: Iowa State University, Office of Biorenewables Programs Collection: Renewable Energy 27 Internal Audit Department Page 1 of 6 Virginia Polytechnic Institute and State...

29

E-Print Network 3.0 - auditing Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Source: Iowa State University, Office of Biorenewables Programs Collection: Renewable Energy 27 Internal Audit Department Page 1 of 6 Virginia Polytechnic Institute and State...

30

E-Print Network 3.0 - audit office tens Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Fact Summary University Actions Taken as of Summary: . The Audit assertion that more than ten million dollars of University expenses was reimbursed... at the Bursar's office....

31

Audit Resolution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's WinSAGA System for Department's WinSAGA System for Energy Grants Management Under the Recovery Act OAS-RA-10-05 March 2010 Department of Energy Washington, DC 20585 March 25, 2010 MEMORANDUM FOR THE ASSISTANT SECRETARY, ENERGY EFFICIENCY AND RENEWABLE ENERGY FROM: Rickey R. Hass Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Management Controls over the Department's WinSAGA System for Energy Grants Management Under the Recovery Act" BACKGROUND As a result of the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of Energy (Department) received $8.1 billion for formula grant programs supporting

32

External audit of clinical practice and medical decision making in a new Asian oncology center: Results and implications for both developing and developed nations  

SciTech Connect

Purpose: The external audit of oncologist clinical practice is increasingly important because of the incorporation of audits into national maintenance of certification (MOC) programs. However, there are few reports of external audits of oncology practice or decision making. Our institution (The Cancer Institute, Singapore) was asked to externally audit an oncology department in a developing Asian nation, providing a unique opportunity to explore the feasibility of such a process. Methods and Materials: We audited 100 randomly selected patients simulated for radiotherapy in 2003, using a previously reported audit instrument assessing clinical documentation/quality assurance and medical decision making. Results: Clinical documentation/quality assurance, decision making, and overall performance criteria were adequate 74.4%, 88.3%, and 80.2% of the time, respectively. Overall 52.0% of cases received suboptimal management. Multivariate analysis revealed palliative intent was associated with improved documentation/clinical quality assurance (p = 0.07), decision making (p 0.007), overall performance (p = 0.003), and optimal treatment rates (p 0.07); non-small-cell lung cancer or central nervous system primary sites were associated with better decision making (p = 0.001), overall performance (p = 0.03), and optimal treatment rates (p = 0.002). Conclusions: Despite the poor results, the external audit had several benefits. It identified learning needs for future targeting, and the auditor provided facilitating feedback to address systematic errors identified. Our experience was also helpful in refining our national revalidation audit instrument. The feasibility of the external audit supports the consideration of including audit in national MOC programs.

Shakespeare, Thomas P. [North Coast Cancer Institute, Coffs Harbour, Sydney, NSW (Australia) and Cancer Institute (Singapore)]. E-mail: ThomasShakespeare@gmail.com; Back, Michael F. [Cancer Institute (Singapore); Lu, Jiade J. [Cancer Institute (Singapore); Lee, Khai Mun [Cancer Institute (Singapore); Mukherjee, Rahul K. [Cancer Institute (Singapore)

2006-03-01T23:59:59.000Z

33

The quality of dental radiography in the Czech Republic?results of a TLD and film postal audit  

Science Journals Connector (OSTI)

......Therefore, an independent postal audit to be performed every 2 y was...MATERIALS AND METHODS The audits aim at checking the whole radiographic...check only the ESAK. For the audit, a dentist receives a dosimetric...system is calibrated in the energy region corresponding to tube......

Leos Novák

2006-09-01T23:59:59.000Z

34

Audits that Make a Difference  

SciTech Connect

This paper presents guidance on how to perform internal audits that get management's attention and result in effective corrective action. It assumes that the reader is already familiar with the basic constructs of auditing and knows how to perform them. Instead, it focuses on additional techniques that have proven to be effective in our internal auditing program. Examples using a theoretical audit of a calibration program are included.

Malsbury, Judith

1999-02-01T23:59:59.000Z

35

Audit Memo Template  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2013 May 1, 2013 MEMORANDUM FOR THE ACTING SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: External Peer Review Report on the Office of Audits The Government Auditing Standards, issued by the Comptroller General of the United States, prescribe that all audit organizations must have an external peer review performed by an independent organization once every 3years. Earlier this year, the Treasury Inspector General for Tax Administration (TIGTA) conducted the required peer review of my Office of Audits. It is our responsibility, under the Government Auditing Standards, to circulate the results of the peer review to the responsible agency head and to the members of Congress. Attached for your information is a copy of the recently completed peer review. I am pleased to

36

Downloads Feed  

NLE Websites -- All DOE Office Websites (Extended Search)

5:57:00 -0600 Wed, 08 Jan 2014 5:57:00 -0600 Wed, 08 Jan 2014 15:59:46 -0600 HIPAA Authorization for Release of Information (ANL-1008) http://www.anl.gov/downloads/hipaa-authorization-release-information-anl-1008 Request for release of health-related information to Argonne for resolution of a healthcare plan claim January 8, 2014 Downloads Feed Key Facts about Argonne National Laboratory http://www.anl.gov/downloads/key-facts-about-argonne-national-laboratory December 16, 2013 Downloads Feed FY14 Argonne Site Sustainability Plan http://www.anl.gov/downloads/fy14-argonne-site-sustainability-plan December 6, 2013 Downloads Feed Blue Cross Blue Shield of Illinois PPO Claim Form http://www.anl.gov/downloads/blue-cross-blue-shield-illinois-ppo-claim-form November 25, 2013 Downloads Feed Key Facts about the Computing, Environment

37

Evaluation of steam path audits  

SciTech Connect

Tri-State Generation and Transmission association is the operating agent for the 1350 megawatt Craig Generating Station, located in northwestern Colorado. Tri-State has recently incorporated turbine steam path audits into their aggressive performance improvement program. The intent of the audits are to quantify and attain the most cost effective increase in turbine performance as a result of a major outage. Valuable information about performance losses in the turbine has been obtained from steam path audits conducted on the three Craig Units. However, accurate audit results often depend on the quality of measurements and the experience of the auditor. Without a second method to verify the results of a steam path audit, repairs might be performed on a non-cost effective basis, or significant performance degradations might be overlooked. In addition, an inaccurate audit may lead to erroneous expectations for performance improvements resulting from the maintenance performed during the outage.

Caudill, M.B. [Tri-State Generation and Transmission Association, Inc., Montrose, CO (United States); Griebenow, R.D. [SAIC, Huntersville, NC (United States)

1995-06-01T23:59:59.000Z

38

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands  

E-Print Network (OSTI)

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.1 Process Memory

Colorado at Boulder, University of

39

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands  

E-Print Network (OSTI)

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.1 Process Memory Download Commands. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Astronomy Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.1 Process Memory

Colorado at Boulder, University of

40

Infrared Audit  

Science Journals Connector (OSTI)

The infrared audit is a technique of investigation that allows ... a surface. Applications of thermography in the energy fields are very widespread, since through such ... . This chapter describes the application...

Giuliano Dall’O’

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Internal Audit Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Internal Audit Services Internal Audit Services Berkeley Lab Internal Audit Services Internal Audit Services Berkeley Lab Contacts Organizational Chart IAS Search Staff Only Lab Search Phone Book A-Z Index Privacy and Security Notice "Internal Auditing is an independent, objective assurance and consulting activity designed to add value and improve an organization's operations. It helps an organization accomplish its objectives by bringing a systematic, disciplined approach to evaluate and improve the effectiveness of risk management, control and governance processes." The Institute of Internal Auditors Standards for the Professional Practice of Internal Auditing About IAS | Audit Committee | Audit Planning | Ethics & Investigations | External Audit Coordination Advisory Services | Other Relevant Audit Links | Contacts | Organizational

42

Audit Followup 020904  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Resolution Audit Resolution Process DOE/IG-0639 February 2004 Audit Resolution Process Details of Finding ........................................................................1 Recommendations and Comments .............................................5 Appendices 1. Objective, Scope, and Methodology ......................................6 2. Prior Audit Reports .................................................................7 3. Management Comments ........................................................8 THE DEPARTMENT'S AUDIT RESOLUTION PROCESS TABLE OF CONTENTS Page 1 Recommendation Resolution and Closure Process The Department of Energy's (Department) current audit resolution process does not always ensure timely and appropriate closure of audit

43

Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audits Audits Audits The Audit Resolution team (AR Team) manages the audit coordination and resolution activities for the Office of Energy Efficiency and Renewable Energy (EERE). They coordinate Recovery Act audits, non-Recovery Act audits, Single Audits and the execution of audit resolution and follow-up activities. The AR Team reviews, and evaluates program operations, activities, and internal controls to ensure effective controls and compliance with policies and best practice. The AR Team collects and validates corrective action data and artifacts to support closure of audit recommendations. Responsibilities Resolves and coordinates all audits Updates all audit statuses on relevant enterprise tracking systems Follows up and coordinates with program offices and field elements

44

Audit Manual | Department of Energy  

Office of Environmental Management (EM)

Audit Manual 2009 Office of Inspector General Audit Manual Audit Manual More Documents & Publications Attachment FY2011-46(1) OPAM Audit Peer Review 2009 Audit Report: OAS-L-04-13...

45

Audit Resolution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science's Office of Science's Management of Information Technology Resources DOE/IG-0831 November 2009 Department of Energy Washington, DC 20585 November 20, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: Audit Report on "The Office of Science's Management of Information Technology Resources" BACKGROUND The Department of Energy's Office of Science (Science) and its facility contractors are aggressive users of information technology (IT) to support fundamental research in areas such as energy, environmental remediation and computational sciences. Of its $4 billion Fiscal Year 2008 budget, Science spent about $287 million to manage its IT program. This included cyber security activities, acquisition of hardware and software, and support

46

Audit Report: OAS-L-03-15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Audit Report: OAS-L-03-15 April 18, 2003 Audit of the Weatherization Assistance Program The purpose of this report is to inform you of the results of our audit of the...

47

Audit Report: OAS-L-03-13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Audit Report: OAS-L-03-13 April 22, 2003 Audit of Performance Measures in the Office of Science The purpose of this report is to inform you of the results of our audit of Office...

48

NDB Download  

NLE Websites -- All DOE Office Websites (Extended Search)

Download Data from FTP Server Download Data from FTP Server Dowload NDB ID to PDB ID mapping (tsv format) Coordinate Files na-biol. Coordinate files (PDB format) for one biological assembly of nucleic acid-containing structures determined by x-ray crystallography. na-deposited. Coordinate files (PDB format) for the asymmetric unit of nucleic acid-containing structures determined by x-ray crystallography. The chirality has been corrected for these structures. na-mmcif. Coordinate files (mmCIF format) for the asymmetric unit of nucleic acid-containing structures determined by x-ray crystallography in mmCIF format. na-nmr. Copies of the coordinate files released by the PDB for nucleic acid-containing structures determined by NMR. na-nmr-mmcif. Coordinate files (mmCIF format) for nucleic

49

Download Fuel Economy Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Download Fuel Economy Data Download Fuel Economy Data Fuel economy data are the result of vehicle testing done at the Environmental Protection Agency's National Vehicle and Fuel Emissions Laboratory in Ann Arbor, Michigan, and by vehicle manufacturers with oversight by EPA. 2013 Ford C-MAX Hybrid Data Revised (August 15, 2013) 2011-2013 Hyundai and Kia data revised (November 2, 2012) Downloadable Fuel Economy Data Find and Compare Cars data - MPG data for all 1984-2014 vehicles (Updated: Friday December 20 2013) For Developers: Fueleconomy.gov Web Services CSV: /feg/epadata/vehicles.csv.zip (Documentation) XML: /feg/epadata/vehicles.xml.zip (Documentation) Fuel Economy Datafile* Fuel Economy Guide Adobe Acrobat Icon Green Vehicle Guide Datafile Green Vehicle Guide Adobe Acrobat Icon

50

Audit Resolution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industrial Carbon Capture and Industrial Carbon Capture and Storage Program Funded by the American Recovery and Reinvestment Act OAS-RA-13-15 March 2013 Department of Energy Washington, DC 20585 March 21, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Industrial Carbon Capture and Storage Program Funded by the American Recovery and Reinvestment Act" INTRODUCTION AND OBJECTIVE The Department of Energy received nearly $1.5 billion through the American Recovery and Reinvestment Act of 2009 (Recovery Act) to invest in clean industrial technologies and sequestration projects through the Industrial Carbon Capture and Storage Program (Carbon Program). The National Energy Technology Laboratory awarded 46 cooperative agreements to a

51

Audit Resolution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Virginia West Virginia OAS-RA-11-09 June 2011 Department of Energy Washington, DC 20585 June 13, 2011 MEMORANDUM FOR THE ACTING ASSISTANT SECRETARY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Weatherization Assistance Program Funded under the American Recovery and Reinvestment Act in the State of West Virginia" BACKGROUND The Department of Energy's Weatherization Assistance Program (Weatherization Program) received $5 billion under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to improve the energy efficiency of residences owned or occupied by low-income persons. The Department subsequently awarded a three-year Recovery Act Weatherization Program grant of

52

Audit Resolution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accounting and Reporting for the Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients OAS-RA-10-06 April 2010 Department of Energy Washington, DC 20585 April 1, 2010 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients" BACKGROUND The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act

53

Internal Audit Preparation Worksheet  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Internal Audit Preparation Job Aid 11_0304 Page 1 of 5 2 Internal Audit Preparation Job Aid 11_0304 Page 1 of 5 EOTA - Business Form Document Title: Internal Audit Preparation Job Aid Document Number: F-012 Rev. 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-007, Internal Audit Process Notify of Changes: Internal Auditors Referenced Document(s): F-011 Internal Audit Report F-012 Internal Audit Preparation Job Aid 11_0304 Page 2 of 5 Revision History: Rev. Description of Change A Initial Release 11_0304 Change title from Worksheet to Job Aid and changed revision from alpha to numeric for consistency. F-012 Internal Audit Preparation Job Aid 11_0304 Page 3 of 5 Internal Audit Preparation Worksheet F-012 Internal Audit Preparation Job Aid 11_0304 Page 4 of 5

54

Internal Audit Preparation Worksheet  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Vendor Audit Schedule 07_1211 1 of 3 9 Vendor Audit Schedule 07_1211 1 of 3 EOTA - Business Form Document Title: Vendor Audit Schedule Document Number: ADMF-009 Rev. 07_1211 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ADMP-002 Notify of Changes: MGT ADM Referenced Document(s): N/A ADMF-009 Vendor Audit Schedule 07_1211 2 of 3 Revision History: Rev. Description of Change A Initial Release 07_1211 Changed some formatting of form. ADMF-009 Vendor Audit Schedule 07_1211 3 of 3 Vendor Audit Schedule Audit #: Enter Company: Criteria: ISO 9001:2008 Standard Date: Team: Audit Lead: Objective: Scope: 1) Business/Quality System 2) Vendor Process 3) Order Processing Day/Date: Enter Arrive @ Facility

55

Audit Report: IG-0382 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2 Audit Report: IG-0382 December 1, 1995 Audit of the Department of Energy's Site Safeguards and Security Plans Audit Report: IG-0382 More Documents & Publications Audit Report:...

56

Ordering Procedures for Contract Audit Services | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ordering Procedures for Contract Audit Services Ordering Procedures for Contract Audit Services Contract Audit Services Ordering Procedures for Contract Audit Services More...

57

Audit Report: IG-0405 | Department of Energy  

Energy Savers (EERE)

05 Audit Report: IG-0405 May 20, 1997 Audit of the Savannah River Site's Quality Control Program for Groundwater Sampling Audit Report: IG-0405 More Documents & Publications Audit...

58

Audit Report: IG-0692 | Department of Energy  

Energy Savers (EERE)

IG-0692 Audit Report: IG-0692 July 8, 2005 Management of Fossil Energy Cooperative Agreements Audit Report: IG-0692 More Documents & Publications Audit Report: IG-0670 Audit...

59

Audit Report: IG-0396 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96 Audit Report: IG-0396 September 13, 1996 Audit of the Department of Energy's Contractor Liability Insurance Costs Audit Report: IG-0396 More Documents & Publications Audit...

60

Audit Report: IG-0375 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Audit Report: IG-0375 June 20, 1995 Audit of the Department of Energy's Management of Precious Metals Audit Report: IG-0375 More Documents & Publications Audit Report:...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Audit Report: IG-0407 | Department of Energy  

Office of Environmental Management (EM)

Audit Report: IG-0407 Audit Report: IG-0407 June 17, 1997 Audit of the Department of Energy's Scientific and Technical Information Process Audit Report: IG-0407 More Documents &...

62

Analytical laboratory quality audits  

SciTech Connect

Analytical Laboratory Quality Audits are designed to improve laboratory performance. The success of the audit, as for many activities, is based on adequate preparation, precise performance, well documented and insightful reporting, and productive follow-up. Adequate preparation starts with definition of the purpose, scope, and authority for the audit and the primary standards against which the laboratory quality program will be tested. The scope and technical processes involved lead to determining the needed audit team resources. Contact is made with the auditee and a formal audit plan is developed, approved and sent to the auditee laboratory management. Review of the auditee's quality manual, key procedures and historical information during preparation leads to better checklist development and more efficient and effective use of the limited time for data gathering during the audit itself. The audit begins with the opening meeting that sets the stage for the interactions between the audit team and the laboratory staff. Arrangements are worked out for the necessary interviews and examination of processes and records. The information developed during the audit is recorded on the checklists. Laboratory management is kept informed of issues during the audit so there are no surprises at the closing meeting. The audit report documents whether the management control systems are effective. In addition to findings of nonconformance, positive reinforcement of exemplary practices provides balance and fairness. Audit closure begins with receipt and evaluation of proposed corrective actions from the nonconformances identified in the audit report. After corrective actions are accepted, their implementation is verified. Upon closure of the corrective actions, the audit is officially closed.

Kelley, William D.

2001-06-11T23:59:59.000Z

63

JULY 27, 2010 AUDIT REPORT  

E-Print Network (OSTI)

JULY 27, 2010 AUDIT REPORT REPORT NO. IG-10-017 (ASSIGNMENT NO. A-09-009-05) OFFICE OF AUDITS AUDIT Administration #12;#12;JULY 27, 2010 REPORT NO. IG-10-017 OVERVIEW AUDIT OF NASA'S RECOVERY ACT PROCUREMENT Act requirements and with NASA and OMB guidance. We performed our audit work at four NASA Centers

Christian, Eric

64

HOSPITAL ENERGY AUDITS: A BIBLIOGRAPHY  

E-Print Network (OSTI)

J.W. "Professional Energy Audit Points Way to $100,0001974 February; 18:57-9. "Energy Audit Procedures. Ii FederalConsultants, Inc. "The Energy Audit: Energy Management."

Pollack, R. I.

2011-01-01T23:59:59.000Z

65

Fermilab | Directorate | Internal Audit Services | Risk Assessment and  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment and Planning Risk Assessment and Planning How are topics selected for an internal audit? A Year At A Glance Throughout the year we collect ideas and input from the Board of Directors Audit Committee, Management, DOE Fermi Site Office and DOE Office of Inspector General. We also reference the Contractor Assurance System (CAS) web pages for information about the structure of the systems. In addition, CAS (management system) owners are interviewed with respect to Internal Audit's risk assessments and audit plans. We prepare reports that summarize the results of individual audits, as well issue an annual report of activities. Internal audit reports are distributed as they are issued, to a wide audience including the Audit Committee, Management, the DOE Fermi Site Office, the DOE Chicago Office,

66

An Olefin Unit's Energy Audit and Implementation  

E-Print Network (OSTI)

-year $44 million capital program which resulted from the Audit. Reorganization of the Olefin unit technical staff to complete the energy conservation program is covered. Several techniques being used to insure operator and maintenance commitment to energy...

Buehler, J. H.

1979-01-01T23:59:59.000Z

67

Evaluations of energy audits and the regulator  

Science Journals Connector (OSTI)

The empirical basis of this article is the energy audit evaluations carried out by AKF over the last decade. These evaluations were undertaken in a rather traditional manner as “assessment of the outcome of an intervention”, the aim being to answer the question: “How much energy was saved as a result of the audit, and what was the result from an economic viewpoint?” To a varying degree, information on the decision-making process within the audit schemes (e.g. control and sanctions) and the organisational context was also included. The present article briefly describes the evaluations, then analyses the resulting response by the energy authorities using three decision-making theories: the rational model for decisions, Wilson's dynamic model, and Stigler's agency capture model. It is demonstrated that these three models together explain the fate of the evaluated audit schemes, e.g. why loss-making schemes have been upheld or expanded.

Anders Larsen; Mette Jensen

1999-01-01T23:59:59.000Z

68

Audit Report - Department of Energy's Isotope Development and Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit, OAS-FS-13-09  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audits and Inspections Audits and Inspections Audit Report Department of Energy's Isotope Development and Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit OAS-FS-13-09 January 2013 MEMORANDUM FOR THE DIRECTOR, OFFICE OF SCIENCE FROM: Daniel M. Weeber Assistant Inspector General for Office of Inspector General SUBJECT: INFORMATION Production for Research and Applications Program's Fiscal Year 2010 Balance Sheet Audit The attached report presents the results of the independent certified public accountants' audit of the Department of Energy's Isotope Development and Production for Research and Applications Program's (Isotope Program) and 2009. The Office of Inspector General (OIG) engaged the independent public accounting firm of

69

Eastern Audits Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Plan for FY 2014 Work Plan for FY 2014 Eastern Audits Division  Follow-up of the Reindustrialization Program at East Tennessee Technology Park  Audit of the Department's Management of High-Risk Property  Audit of the Department's Efforts to Reduce Mercury Contamination at the Y-12 National Security Complex  Non-conforming Equipment and Parts at the Savannah River Site  Audit of the Department's Facility Contractors' Use of No Bid Subcontracts  Decontamination and Decommissioning Activities at the Oak Ridge National Laboratory  The Department's Audit Resolution and Follow-up Process  Legacy Management Activities at Selected Sites  Department's Contract Awards Made to Alaska Native Corporation  Readiness of the Saltstone Disposal Facility at the Savannah River Site

70

Assessor Training Internal Audits and  

E-Print Network (OSTI)

NVLAP Assessor Training Internal Audits and Management Reviews #12;Assessor Training 2009, quarterly, etc., schedule throughout the year #12;Assessor Training 2009: Internal Audits and Management a copy of the full internal audit schedule. #12;Assessor Training 2009: Internal Audits and Management

71

BOARD OF GOVERNORS Audit Committee  

E-Print Network (OSTI)

with the independent auditor to: - review the audit plan, including approach to evaluating internal control prior - review and approve annually, Internal Audit's risk-based audit plans; - review and approve the performance of the external auditors, (4) internal audit function, and (5) compliance with legal, regulatory

Brownstone, Rob

72

Part I, General Audit Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and subrecipients of and subrecipients of federal financial assistance from the Department of Energy (DOE). Such compliance audits must be conducted in accordance with the requirements and guidance set forth in Statement on Auditing Standards No. 117, Compliance Audits (SAS 117) and generally accepted government auditing standards (GAGAS). See section C below for more detail. The audit procedures provided in this Audit Program are the minimum necessary for uniform and consistent audit coverage. Auditors conducting audits of entities subject to the requirements of Office of Management and Budget (OMB) Circular No. A-133, Audits of States, Local Governments and Non-Profit Organizations, should not use this Audit Program and should instead refer to the Circular and the

73

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

74

AIRMaster: Compressed air system audit software  

SciTech Connect

The project goal was to develop a software tool, AIRMaster, and a methodology for performing compressed air system audits. AIRMaster and supporting manuals are designed for general auditors or plant personnel to evaluate compressed air system operation with simple instrumentation during a short-term audit. AIRMaster provides a systematic approach to compressed air system audits, analyzing collected data, and reporting results. AIRMaster focuses on inexpensive Operation and Maintenance (O and M) measures, such as fixing air leaks and improving controls that can significantly improve performance and reliability of the compressed air system, without significant risk to production. An experienced auditor can perform an audit, analyze collected data, and produce results in 2--3 days. AIRMaster reduces the cost of an audit, thus freeing funds to implement recommendations. The AIRMaster package includes an Audit Manual, Software and User's manual, Analysis Methodology Manual, and a Case Studies summary report. It also includes a Self-Guided Tour booklet to help users quickly screen a plant for efficiency improvement potentials, and an Industrial Compressed Air Systems Energy Efficiency Guidebook. AIRMaster proved to be a fast and effective audit tool. In sever audits AIRMaster identified energy savings of 4,056,000 kWh, or 49.2% of annual compressor energy use, for a cost savings of $152,000. Total implementation costs were $94,700 for a project payback period of 0.6 years. Available airflow increased between 11% and 51% of plant compressor capacity, leading to potential capital benefits from 40% to 230% of first year energy savings.

Wheeler, G.M.; Bessey, E.G.; McGill, R.D.; Vischer, K.

1997-07-01T23:59:59.000Z

75

Audit Report: IG-0370 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Audit Report: IG-0370 March 29, 1995 Audit of Staffing Requirements for the Strategic Petroleum Reserve Audit Report: IG-0370 More Documents & Publications Inspection Report:...

76

Audit Report: IG-0379 | Department of Energy  

Energy Savers (EERE)

79 Audit Report: IG-0379 September 8, 1995 Report on Audit of Bonneville Power Administration's Energy Resource Programs Audit Report: IG-0379 More Documents & Publications...

77

Audit Report: IG-0380 | Department of Energy  

Energy Savers (EERE)

0 Audit Report: IG-0380 October 11, 1995 Audit of the Department of Energy's Transportation Accident Resistant Container Program Audit Report: IG-0380 More Documents & Publications...

78

Audit Report: IG-0387 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

87 Audit Report: IG-0387 March 22, 1996 Report on Audit of Architect and Engineering Costs at the Idaho National Engineering Laboratory Audit Report: IG-0387 More Documents &...

79

Audit Report: IG-0402 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Audit Report: IG-0402 April 1, 1997 Audit of the Management of the Department of Energy's Leased Administrative Facilities Audit Report: IG-0402 More Documents & Publications...

80

Audit Report: IG-0390 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Audit Report: IG-0390 May 8, 1996 Department of Energy Management and Operating Contractor Available Fees Audit Report: IG-0390 More Documents & Publications Audit Report:...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

INFILTRATION MEASUREMENTS IN AUDIT AND RETROFIT PROGRAMS  

E-Print Network (OSTI)

Energy Agency (IEA) Energy Audit Workshop, Elsinore,13-15, 1981. (IEA) Energy Audit INFILTRATION MEASUREMENTS INThe first is an energy audit to determine economically

Grimsrud, D.T.

2014-01-01T23:59:59.000Z

82

Audit Report: IG-0404 | Department of Energy  

Office of Environmental Management (EM)

IG-0404 Audit Report: IG-0404 May 7, 1997 Audit of Department of Energy Contractor Occupational Injury and Illness Reporting Practices Audit Report: IG-0404 More Documents &...

83

Audit Report: IG-0395 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Audit Report: IG-0395 August 19, 1996 Audit of the Department of Energy's User Facilities Audit Report: IG-0395 More Documents & Publications Semiannual Report to Congress: April...

84

Audit Report: IG-0411 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Audit Report: IG-0411 August 13, 1997 Audit of the Contractor Incentive Programs at the Rocky Flats Environmental Technology Site Audit Report: IG-0411 More Documents &...

85

NSTec Internal Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Government Department of Energy Memorandum DATE: June 8, 2011 Audit Report Number: OAS- L-11-04 REPLY TO ATTN OF: IG-36 (A10LV009) SUBJECT: Audit Report on the "Follow-up Audit of National Nuclear Security Administration's Nuclear Explosive Safety Study Program" TO: Manager, Pantex Site Office INTRODUCTION AND OBJECTIVE One of the primary missions of the Department of Energy's (Department) National Nuclear Security Administration (NNSA) is to maintain the safety, security, and reliability of the nation's nuclear weapons stockpile. Many of the nuclear explosive operations related to this mission, including assembly, disassembly, surveillance, refurbishment, and dismantlement of nuclear weapons, are performed at the Pantex Plant

86

Remote auditing of radiotherapy facilities using optically stimulated luminescence dosimeters  

SciTech Connect

Purpose: On 1 July 2012, the Australian Clinical Dosimetry Service (ACDS) released its Optically Stimulated Luminescent Dosimeter (OSLD) Level I audit, replacing the previous TLD based audit. The aim of this work is to present the results from this new service and the complete uncertainty analysis on which the audit tolerances are based. Methods: The audit release was preceded by a rigorous evaluation of the InLight® nanoDot OSLD system from Landauer (Landauer, Inc., Glenwood, IL). Energy dependence, signal fading from multiple irradiations, batch variation, reader variation, and dose response factors were identified and quantified for each individual OSLD. The detectors are mailed to the facility in small PMMA blocks, based on the design of the existing Radiological Physics Centre audit. Modeling and measurement were used to determine a factor that could convert the dose measured in the PMMA block, to dose in water for the facility's reference conditions. This factor is dependent on the beam spectrum. The TPR{sub 20,10} was used as the beam quality index to determine the specific block factor for a beam being audited. The audit tolerance was defined using a rigorous uncertainty calculation. The audit outcome is then determined using a scientifically based two tiered action level approach. Audit outcomes within two standard deviations were defined as Pass (Optimal Level), within three standard deviations as Pass (Action Level), and outside of three standard deviations the outcome is Fail (Out of Tolerance). Results: To-date the ACDS has audited 108 photon beams with TLD and 162 photon beams with OSLD. The TLD audit results had an average deviation from ACDS of 0.0% and a standard deviation of 1.8%. The OSLD audit results had an average deviation of ?0.2% and a standard deviation of 1.4%. The relative combined standard uncertainty was calculated to be 1.3% (1?). Pass (Optimal Level) was reduced to ?2.6% (2?), and Fail (Out of Tolerance) was reduced to >3.9% (3?) for the new OSLD audit. Previously with the TLD audit the Pass (Optimal Level) and Fail (Out of Tolerance) were set at ?4.0% (2?) and >6.0% (3?). Conclusions: The calculated standard uncertainty of 1.3% at one standard deviation is consistent with the measured standard deviation of 1.4% from the audits and confirming the suitability of the uncertainty budget derived audit tolerances. The OSLD audit shows greater accuracy than the previous TLD audit, justifying the reduction in audit tolerances. In the TLD audit, all outcomes were Pass (Optimal Level) suggesting that the tolerances were too conservative. In the OSLD audit 94% of the audits have resulted in Pass (Optimal level) and 6% of the audits have resulted in Pass (Action Level). All Pass (Action level) results have been resolved with a repeat OSLD audit, or an on-site ion chamber measurement.

Lye, Jessica, E-mail: jessica.lye@arpansa.gov.au; Dunn, Leon; Kenny, John; Alves, Andrew [Australian Clinical Dosimetry Service, Yallambie, Victoria 3085 (Australia)] [Australian Clinical Dosimetry Service, Yallambie, Victoria 3085 (Australia); Lehmann, Joerg; Williams, Ivan [Australian Clinical Dosimetry Service, Yallambie, Victoria 3085, Australia and School of Applied Science, RMIT University, Melbourne 3000 (Australia)] [Australian Clinical Dosimetry Service, Yallambie, Victoria 3085, Australia and School of Applied Science, RMIT University, Melbourne 3000 (Australia); Kron, Tomas [School of Applied Science, RMIT University, Melbourne 3000, Australia and Peter MacCallum Cancer Centre, Melbourne 3008 (Australia)] [School of Applied Science, RMIT University, Melbourne 3000, Australia and Peter MacCallum Cancer Centre, Melbourne 3008 (Australia); Oliver, Chris; Butler, Duncan; Johnston, Peter [Australian Radiation Protection and Nuclear Safety Agency, Yallambie, Victoria 3085 (Australia)] [Australian Radiation Protection and Nuclear Safety Agency, Yallambie, Victoria 3085 (Australia); Franich, Rick [School of Applied Science, RMIT University, Melbourne 3000 (Australia)] [School of Applied Science, RMIT University, Melbourne 3000 (Australia)

2014-03-15T23:59:59.000Z

87

Total assessment audits (TAA) in Iowa  

SciTech Connect

Traditionally, energy, waste reduction and productivity audits are performed for a manufacturing facility independent of one another. Auditors generally deliver recommendations for improvement based on their specialized expertise (energy, waste reduction, productivity, etc.) without regard to how those recommendations may impact other, sometimes less obvious, subsystems or processes within the facility. The audits are typically performed in isolation from the plant upper management and commonly without adequate knowledge of how inherent interrelated operational constraints may directly or indirectly influence the success of audit recommendations. The Total Assessment Audit (TAA) concept originated from the belief that a manufacturing facility is better served using a holistic approach to problem solving rather than the more conventional isolated approach. The total assessment audit methodology partners the upper management team of a company with a multi-disciplined team of industry-specific specialists to collectively ascertain the core opportunities for improvement in the company and then to formulate a company oriented continuous improvement plan. Productivity, waste reduction, and energy efficiency objectives are seamlessly integrated into a single service delivery with the TAA approach. Nontraditional audit objectives that influence profitability and competitiveness such as business management practices, employee training, human resource issues, etc. are also subject to evaluation in a TAA. The underlying premise of this approach is that the objectives are interrelated and that simultaneous evaluation will province synergistic results. Ultimately, it is believed that the TAA approach can motivate a manufacturer to implement improvements it might not otherwise pursue if it were focused only on singular objectives.

Haman, W.G.

1999-07-01T23:59:59.000Z

88

Energy Audit Equipment  

E-Print Network (OSTI)

The tools (equipment) needed to perform an energy audit include those items which assist the auditor in measuring the energy used by equipment or lost in inefficiency. Each tool is designed for a specific measurement. They can be inexpensive simple...

Phillips, J.

2012-01-01T23:59:59.000Z

89

Southwestern Federal Power System's Fiscal Year 2011 Financial Statement Audit, OAS-FS-13-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Federal Power Southwestern Federal Power System's Fiscal Year 2011 Financial Statement Audit OAS-FS-13-06 November 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 November 29, 2012 MEMORANDUM FOR THE ADMINISTRATOR, SOUTHWESTERN POWER ADMINISTRATION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Southwestern Federal Power System's Fiscal Year 2011 Financial Statement Audit" The attached report presents the results of the independent certified public accountants' audit of the Southwestern Federal Power System's (SWFPS) combined balance sheets, as of September 30,

90

Oneida Tribe Energy Audits  

SciTech Connect

Project funding energy audits of 44 Tribally owned buildings operated by the Oneida Tribe of Indians of WI. Buildings were selected for their size, age, or known energy concerns and total over 1 million square feet. Audits include feasibility studies, lists of energy improvement opportunities, and a strategic energy plan to address cost effective ways to save energy via energy efficiency upgrades over the short and long term.

Olson, Ray [Energy Controls Manager; Schubert, Eugene [Policy Analyst

2014-08-15T23:59:59.000Z

91

Southwestern Federal Power System's Fiscal Year 2012 Financial Statement Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Federal Power Southwestern Federal Power System's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-13 August 2013 Department of Energy Washington, DC 20585 August 12, 2013 MEMORANDUM FOR THE ADMINISTRATOR, SOUTHWESTERN POWER ADMINISTRATION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Southwestern Federal Power System's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Southwestern Federal Power System's (SWFPS) combined balance sheets, as of September 30, 2012 and 2011, and the related combined statements of changes in

92

Audit Report: OAS-L-03-20 | Department of Energy  

Energy Savers (EERE)

Audit Report: OAS-L-03-20 September 11, 2003 Audit of Procurement Administration at the Oak Ridge National Laboratory The purpose of this report is to inform you of the results...

93

Audit Report: OAS-L-03-11 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 Audit Report: OAS-L-03-11 February 26, 2003 Audit of the Office of Science Infrastructure Modernization Initiatives The purpose of this report is to inform you of the results of...

94

Audit Report: OAS-L-03-10 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Audit Report: OAS-L-03-10 February 19, 2003 Audit of the Research and Development Investment Criteria for Fossil Energy The purpose of this report is to inform you of the results...

95

Audit Report: OAS-L-04-04 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

report is to inform you of the results of our audit of the U.S. Large Hadron Collider (LHC) Program. The audit was initiated in June 2003, and fieldwork was conducted through...

96

Audit Report: IG-0376 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Audit Report: IG-0376 August 2, 1995 Audit of Program Administration by the Office of Energy Research Audit Report: IG-0376 More Documents & Publications Audit Report: IG-0407...

97

Writing audit findings: Be reasonable  

SciTech Connect

A customary approach to auditing and reporting deficiencies is to keep a running list of those that are found, evaluate the severity of each, and based on the evidence, document findings or observations or concerns in an audit report. The report is issued and the auditee is normally requested to address root cause'' as part of their corrective action. This paper describes a root problems'' approach to documenting audit findings that is designed not only to put the QA auditor in a more favorable light, but to more effectively enable the auditee to identify root cause and meaningful corrective action. The positive results of this approach are considerable. You will have fewer findings but those you do have will be substantial. You will cite requirements that sound reasonable and make arguments difficult. If some of the supporting deficiencies (examples) prove to be incorrect, you will still have ample support for the original finding. You will be seen as reasonable individual who can help lead the auditee towards identification of root cause without taking away part of the responsibility. You even have a fair chance of fostering a sense of commitment to quality improvement on the auditee's part. This in itself, is its own reward.

Girvin, N.W.

1992-05-01T23:59:59.000Z

98

Writing audit findings: Be reasonable!  

SciTech Connect

A customary approach to auditing and reporting deficiencies is to keep a running list of those that are found, evaluate the severity of each, and based on the evidence, document findings or observations or concerns in an audit report. The report is issued and the auditee is normally requested to address ``root cause`` as part of their corrective action. This paper describes a ``root problems`` approach to documenting audit findings that is designed not only to put the QA auditor in a more favorable light, but to more effectively enable the auditee to identify root cause and meaningful corrective action. The positive results of this approach are considerable. You will have fewer findings but those you do have will be substantial. You will cite requirements that sound reasonable and make arguments difficult. If some of the supporting deficiencies (examples) prove to be incorrect, you will still have ample support for the original finding. You will be seen as reasonable individual who can help lead the auditee towards identification of root cause without taking away part of the responsibility. You even have a fair chance of fostering a sense of commitment to quality improvement on the auditee`s part. This in itself, is its own reward.

Girvin, N.W.

1992-05-01T23:59:59.000Z

99

Fermilab | Directorate | Internal Audit Services | Internal Audit Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Internal Audit Process Internal Audit Process What happens during an internal audit? Announcement Before an audit begins, we distribute an announcement letter to those who will serve as our primary audit contacts. The letter briefly outlines the preliminary audit objectives, and the general audit process. Planning Planning is the first phase of the audit. During planning, we review policies and procedures in order to gain an understanding of how work is accomplished. We typically conduct several transaction walk-throughs by tracing transactions from beginning to end. Policies, procedures, walk-throughs, and discussions with personnel enable us to identify controls and assess associated risks. The planning phase helps us fine-tune our approach and finalize our work program. It is our goal to use electronic data whenever possible. Frequently we

100

Small Business Energy Audit Program  

Energy.gov (U.S. Department of Energy (DOE))

This matching grant provides 75% for a level 2 energy audit up to a maximum of $2,500. A Level 2 Energy audit will include quantifications of energy users and losses through a detailed review and...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Compressed Air Audits using AIRMaster  

E-Print Network (OSTI)

Air compressors are a significant industrial energy user and therefore a prime target for industrial energy audits. The project goal was to develop a software tool, AIRMaster, and supporting methodology for performing compressed air system audits...

Wheeler, G. M.; McGill, R. D.; Bessey, E. G.; Vischer, K.

102

Kirloskar unveils energy audit website  

Science Journals Connector (OSTI)

Kirloskar Brothers Ltd (KBL) has launched an energy audit services website for pumps and motors at www.pumpenergyaudit.com.

2011-01-01T23:59:59.000Z

103

Sexy Audits and the Single Ballot Election Verification Network Annual Conference  

E-Print Network (OSTI)

Sexy Audits and the Single Ballot Election Verification Network Annual Conference Washington, DC 25 is wrong. Compliance audits vs. materiality audits. 5 #12;California AB 2023 (Salda~na, sponsored by So of, and public confidence in, election results. The Secretary of State is encouraged to include urban

Stark, Philip B.

104

Energy Metering Audit Procedure  

E-Print Network (OSTI)

Energy Meterilg Audtt Procedure Wiliam S Whitaker Engineering Specialist T X E INC. laPorte Texas INTROOUCI'ION This paper describes the recent audit of the utility distriooticn meters in a petrochanica1 plant. These meters measure the steam..., cx:ndensate, natural gas, water, nitrogen and air flCMS to the different process units within the plant. This audit started as an attellPt to resolve discrepan::ies between the 650 PSIG steam distriootion and supply meters. Theoretically the sum...

Whitaker, W. S.

105

Audit Report: IG-0520 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 Audit Report: IG-0520 August 31, 2001 Peer-Reviewed Scientific Literature Generated at the Department's Light Sources The Department of Energy (Department) operates four light source facilities which are used to conduct experiments in disciplines such as chemistry, biology, and physics. In Fiscal Year (FY) 2000, the light sources, located at Argonne National Laboratory, Brookhaven National Laboratory, Lawrence Berkeley National Laboratory, and the Stanford Linear Accelerator Center, received $172 million in funding and served over 5,000 users. Research performed at the light sources resulted in the publication of over 540 peer-reviewed scientific journal articles in FY 2000. Audit Report: IG-0520 More Documents & Publications Audit Report: WR-B-02-02

106

Audit Report: IG-0412 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Audit Report: IG-0412 October 20, 1997 Audit of the Contractor Incentive Program at the Nevada Operations Office The Department of Energy (Department) is using performance-based contracts to address problems associated with its traditional management and operating contracts. Under this approach, contractor performance is to be evaluated against performance measures which are clearly stated, results-oriented, and established prior to performance. The performance measures, which reflect the Department's expectations of the contractor, are the basis for rewarding superior contractor performance through the use of incentive fees. The purpose of our audit was to determine whether performance-based contracting, as incorporated in the Bechtel Nevada Corporation (Bechtel) contract for the management of the Department's

107

Energy Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Audits Energy Audits Energy Audits September 9, 2008 - 11:30am Addthis John Lippert What does this mean for me? Energy audits can help you determine whether your home wastes energy, and pinpoint where energy is lost -- so you can evaluate what measures you can take to make your home more energy efficient. Autumn officially begins soon, and with it comes cooler weather and fewer hours of daylight. Fall is a great time to start thinking of a home energy audit so that you can prepare your home for winter, saving energy and money in the process. The main purpose of an energy audit is to determine whether your home wastes energy, and to pinpoint where energy is being lost so you can evaluate what measures you can take to make your home more energy efficient. Audits also determine the efficiency of your home's heating

108

Energy Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Audits Energy Audits Energy Audits September 9, 2008 - 11:30am Addthis John Lippert What does this mean for me? Energy audits can help you determine whether your home wastes energy, and pinpoint where energy is lost -- so you can evaluate what measures you can take to make your home more energy efficient. Autumn officially begins soon, and with it comes cooler weather and fewer hours of daylight. Fall is a great time to start thinking of a home energy audit so that you can prepare your home for winter, saving energy and money in the process. The main purpose of an energy audit is to determine whether your home wastes energy, and to pinpoint where energy is being lost so you can evaluate what measures you can take to make your home more energy efficient. Audits also determine the efficiency of your home's heating

109

Audit of the DOE's Commercial Laboratory Quality Assurance Evaluation Program, IG-0374  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 1995 20, 1995 IG-1 INFORMATION: "Audit of the Department of Energy's Commercial Laboratory Quality Assurance Evaluation Program" The Secretary BACKGROUND: The audit was undertaken because of problems identified during prior Office of Inspector General audit work. This audit work identified problems related to quality assurance at both subcontract commercial laboratories and M&O contractor operated laboratories. DISCUSSION: The audit disclosed that contractors conducted redundant quality assurance evaluations of commercial laboratories, did not evaluate others, applied standards inconsistently, produced inconsistent results, and did not communicate those results among contractors. We found that 103 of the 206 quality

110

Audit Report: IG-0627 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Audit Report: IG-0627 November 24, 2003 Federal Energy Regulatory Commission's Performance Management The Federal Energy Regulatory Commission, as an independent, five-member body, regulates certain aspects of the oil, natural gas, and electricity industries, and licenses hydroelectric projects. As required by the Government Performance and Results Act of 1993, the Commission developed performance goals in four major areas to help guide mission accomplishment: Energy Infrastructure, Competitive Markets, Market Oversight, and Resource Management. In support of its goals, the Commission established about 45 annual performance measures and a number of related targets. Audit Report: IG-0627 More Documents & Publications Semiannual Report to Congress: October 1, 2003 - March 31, 2004

111

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 8190 of 9,640 results. 81 - 8190 of 9,640 results. Download Audit Report: WR-B-96-04 Audit of Fuel Processing Restoration Property http://energy.gov/ig/downloads/audit-report-wr-b-96-04 Download Audit Report: WR-B-95-08 Audit of Subsidized Ancillary Services at the Nevada Test Site http://energy.gov/ig/downloads/audit-report-wr-b-95-08 Download Audit Report: AP-B-95-02 Audit of Selected Aspects of the Unclassified Computer Security Program at a DOE Headquarters Computing Facility http://energy.gov/ig/downloads/audit-report-ap-b-95-02 Download Audit Report: ER-B-95-04 Audit of the Replacement High Level Waste Evaporator at Savannah River http://energy.gov/ig/downloads/audit-report-er-b-95-04 Download Audit Report: IG-0368 Audit of the Richland Operations Office Site Characterization Program

112

Sharon Kurek, CPA, CFE Director of Internal Audit Definition of Internal Auditing  

E-Print Network (OSTI)

Sharon Kurek, CPA, CFE ­ Director of Internal Audit #12;· Definition of Internal Auditing · Scope

Buehrer, R. Michael

113

Audit Report: IG-0753  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resolution of Significant Finding Resolution of Significant Finding Investigation Recommendations DOE/IG- November 2002 U.S. Department of Energy Office of Inspector General Office of Audit Services Recovery of Costs for the Proprietary Use of the Advanced Photon Source DOE/IG-0753 January 2007 Department of Energy Washing<~n, DC 20585 January 11, 2007 MEMORANDUM FOR TEE SECRETARY FROM: Greg + ? * y . n e man Inspector General SUBJECT: INFORMATION: Audit Report on "Recovery of Costs for the Proprietary Use of the Advanced Photon Source1' BACKGROUND The Department of Energy is responsible for the operation of the Advanced Photon Source, a light source user facility at the Argonne National Laboratory. The facility was, until recently, operated for the Department by the University of Chicago. It is currently

114

Downloads | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Downloads Downloads Topic - Any - General Argonne Information -Awards -Honors Energy -Energy efficiency --Vehicles ---Alternative fuels ---Automotive engineering ---Biofuels ---Diesel ---Electric drive technology ---Fuel economy ---Fuel injection ---Heavy-duty vehicles ---Hybrid & electric vehicles ---Hydrogen & fuel cells ---Internal combustion ---Maglev systems ---Powertrain research ---Vehicle testing --Building design ---Construction ---Industrial heating & cooling ---Industrial lighting --Manufacturing -Energy sources --Renewable energy ---Bioenergy ---Geothermal energy ---Hydropower ---Solar energy ---Wind energy --Fossil fuels ---Coal ----Carbon capture & sequestration ---Oil ---Natural Gas --Hydrogen --Nuclear energy ---Nuclear energy modeling & simulation ---Nuclear fuel cycle ----Geology & disposal

115

Audit Report: IG-0743 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Audit Report: IG-0743 October 18, 2006 Remediation of the Waste Burial Grounds at the Hanford Site Audit Report: IG-0743 More Documents & Publications Audit Report: OAS-RA-L-11-08...

116

Audit Report: IG-0447 | Department of Energy  

Energy Savers (EERE)

47 Audit Report: IG-0447 July 7, 1999 The U.S. Department of Energy's Audit Follow-up Process Audit follow-up is an integral part of good management. According to Office of...

117

Audit Report: IG-0399 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Audit Report: IG-0399 January 8, 1997 Audit of the U.S. Department of Energy's Identification and Disposal of Nonessential Land Audit Report: IG-0399 More Documents &...

118

Audit Report: IG-0394 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Audit Report: IG-0394 August 19, 1996 Special Audit of Pension Plans for Department of Energy Contract Employees of the University of California Audit Report: IG-0394 More...

119

Audit Report: IG-0766 | Department of Energy  

Energy Savers (EERE)

Audit Report: IG-0766 Audit Report: IG-0766 May 24, 2007 The Department's Audit Resolution and Follow-up Process Over the years, the Office of Inspector General has issued findings...

120

Wayne State University Office of Internal Audit  

E-Print Network (OSTI)

P. Hafner, CIA, CBA Forensic Audit Director Fannie Moore CFE, CFCI Staff Auditor Feiling Li, CIA, CFE, MBA Forensic Auditor Associate Director Lori Tesch CPA, CFE, CFF, FCPA Operational Audit Director Janice SantosCarlini CPA, CA, CFE, MBA Audit

Cinabro, David

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Audit Report: OAS-FS-07-02 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OAS-FS-07-02 OAS-FS-07-02 Audit Report: OAS-FS-07-02 November 13, 2006 Report on the Department of Energy's Fiscal Year 2006 Consolidated Balance Sheet In response to requirements established by the Government Management Reform Act of 1994, the Office of Inspector General engages the independent public accounting for of KMPG LLP to audit the Department of Energy's Fiscal Year (FY) 2006 consolidated balance sheet. The contractor was engages to audit only the balance sheet because a material weakness in financila control and reporting resulted in a disclaimer of opinion on the FY 2005 Audit of the Department's Consolidated Financial Statements. Audit Report: OAS-FS-07-02 More Documents & Publications Financial Statement: OAS-FS-07-02 Audit Report: OAS-FS-12-04 Audit Report: OAS-FS-11-04

122

Audit Report: OAS-FS-09-06 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Audit Report: OAS-FS-09-06 August 26, 2009 Uranium Enrichment Decontamination and Decommissioning Fund's Fiscal Year 2006 and 2005 Financial Statement Audit The attache report presents the results of the independent certified public accountants' audit of the United States Department of Energy's Uranium Enrichment Decontamination Decommissioning Fund's (D&D Fund) Fiscal Year (FY) 2006 and 2005 balance sheets and the related statements of net cost, changes in net position (deficit), budgetary resources and financing. Audit Report: OAS-FS-09-06 More Documents & Publications Audit Report: OAS-FS-10-05 Uranium Enrichment Decontamination and Decommissioning Fund's Fiscal Year 2008 and 2007 Financial Statement Audit, OAS-FS-10-05 Audit Report: OAS-FS-13

123

For-Profit Audit Guidance (FY 2010) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

For-Profit Audit Guidance (FY 2010) For-Profit Audit Guidance (FY 2010) Coverage of Independent Audits of For-Profit Firms Audits for For-Profit Firms FAQ Part I, General Audit...

124

Audit Report: IG-0416 | Department of Energy  

Office of Environmental Management (EM)

6 Audit Report: IG-0416 December 23, 1997 Audit of Support Services Subcontracts at Argonne National Laboratory Departmental policy prohibits the use of subcontracts awarded by...

125

Audit Report: IG-0366 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-0366 February 15, 1995 Audit of Management of the Site Characterization Program at Yucca Mountain Audit Report: IG-0366 More Documents & Publications EIS-0250-S1: Draft...

126

Audit Report: IG-0799 | Department of Energy  

Office of Environmental Management (EM)

799 Audit Report: IG-0799 July 31, 2008 Sandia National Laboratories Nuclear Weapons Safety Program (U) The following is an unclassified summary of the classified Audit Report on...

127

Audit Report: IG-0702 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

IG-0702 September 30, 2005 Use of Performance Based Incentives by the Office of Civilian Radioactive Waste Management Audit Report: IG-0702 More Documents & Publications Audit...

128

Rural Development Energy Audit & Renewable Energy Development...  

Office of Environmental Management (EM)

Rural Development Energy Audit & Renewable Energy Development Assistance Webinar Rural Development Energy Audit & Renewable Energy Development Assistance Webinar January 21, 2015...

129

Audit Report: IG-0860 | Department of Energy  

Energy Savers (EERE)

Audit Report: IG-0860 Audit Report: IG-0860 February 28, 2012 The Department of Energy's Implementation of Homeland Security Presidential Directive 12 Homeland Security...

130

ENERGY AUDIT of GEFLE VAPEN.  

E-Print Network (OSTI)

?? The energy audit is a very interesting and complex work. The building energy audit is defined as a process to evaluate where the energy… (more)

Sui, Chen

2009-01-01T23:59:59.000Z

131

Audit Report: IG-0417 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Audit Report: IG-0417 March 13, 1998 Audit of the Department of Energy's Management of Research and Development Integration The Congress, independent task forces, and advisory...

132

Audit Report: IG-0789 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89 Audit Report: IG-0789 March 13, 2008 Audit Report on Management of the Department's Publicly Accessible Websites The Department of Energy and its prime contractors operate...

133

Audit Report: IG-0740 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Audit Report: IG-0740 September 26, 2006 The National Nuclear Security Administration's B61 Spin RocketMotor Project Audit Report: IG-0740 More Documents & Publications The...

134

Sault Tribe Building Efficiency Energy Audits  

SciTech Connect

The Sault Ste. Marie Tribe of Chippewa Indians is working to reduce energy consumption and expense in Tribally-owned governmental buildings. The Sault Ste. Marie Tribe of Chippewa Indians will conduct energy audits of nine Tribally-owned governmental buildings in three counties in the Upper Peninsula of Michigan to provide a basis for evaluating and selecting the technical and economic viability of energy efficiency improvement options. The Sault Ste. Marie Tribe of Chippewa Indians will follow established Tribal procurement policies and procedures to secure the services of a qualified provider to conduct energy audits of nine designated buildings. The contracted provider will be required to provide a progress schedule to the Tribe prior to commencing the project and submit an updated schedule with their monthly billings. Findings and analysis reports will be required for buildings as completed, and a complete Energy Audit Summary Report will be required to be submitted with the provider?s final billing. Conducting energy audits of the nine governmental buildings will disclose building inefficiencies to prioritize and address, resulting in reduced energy consumption and expense. These savings will allow Tribal resources to be reallocated to direct services, which will benefit Tribal members and families.

Holt, Jeffrey W.

2013-09-26T23:59:59.000Z

135

Environmental audit, Bonneville Power Administration, lower Columbia area  

SciTech Connect

This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

Not Available

1990-11-01T23:59:59.000Z

136

Audit Report: IG-0439 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-0439 IG-0439 Audit Report: IG-0439 February 4, 1999 The U. S. Department of Energy's Implementation of the Government Performance and Results Act The Government Performance and Results Act of 1993 (Results Act) was enacted to improve Federal program effectiveness and public accountability by promoting a new focus on results-oriented management. The Results Act requires plans that define the mission, long-term goals, and shorter-term performance measures. Further, the Act envisions that there will be an apparent relationship between this information and specific activities listed in the Department's budget requests. Taken together, these elements should clearly describe the outputs and outcomes the Department expects to deliver for the resources expended. The objectives of this audit

137

Audit Report: IG-0439 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

39 39 Audit Report: IG-0439 February 4, 1999 The U. S. Department of Energy's Implementation of the Government Performance and Results Act The Government Performance and Results Act of 1993 (Results Act) was enacted to improve Federal program effectiveness and public accountability by promoting a new focus on results-oriented management. The Results Act requires plans that define the mission, long-term goals, and shorter-term performance measures. Further, the Act envisions that there will be an apparent relationship between this information and specific activities listed in the Department's budget requests. Taken together, these elements should clearly describe the outputs and outcomes the Department expects to deliver for the resources expended. The objectives of this audit

138

EPA clarifies its environmental auditing policy  

SciTech Connect

EPA's audit policy is entitled ''Environmental Auditing Policy Statement.'' EPA's current policy is intended to encourage regulated entities to develop, implement and periodically upgrade environmental auditing programs. The policy outlines the elements EPA believes must be included in an audit program if it is to be effective. These include: Explicit top management support for environmental auditing and commitment to follow up on audit findings; An environmental auditing function independent of auditing activities; Adequate team staffing and auditor training; Explicit audit program objectives, scope, resources and frequency; A process that collects, analyzes, interprets and documents information sufficient to achieve audit objectives. A process that includes specific procedure to prepare promptly candid, clear and appropriate written reports on audit findings, corrective actions and schedules for implementation; and A process that includes quality assurance procedures.

Bergeson, L.L.

1994-10-01T23:59:59.000Z

139

Audit Report: IG-0749  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Science, Energy, Science, and Environment Sites' Implementation of the Design Basis Threat DOE/IG-0749 December 2006 Department of Energy Washington, DC 20585 December 14, 2006 MEMORANDUM FOR .13HEfiECREJARY 4 - Crregor . Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "'I'he Department's Energy, Science, and Environment Sites' Implenneritation of the Design Basis Threat" BACKGROUND 'Phe Department of Energy uses the "Design Basis Threat" (DBT) process to guide and manage its safeguards and security program throughout the complex. The DBT identifies the most credible threats posed by adversaries to highly sensitive and classified Departmental qssets and operations. In essence, the DBT sets the standards that site

140

Audit Report: IG-0773  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Confirmatory Bioassay Testing at Confirmatory Bioassay Testing at Selected Sites DOE/IG-0773 August 2007 Department of Energy Washington, DC 20585 August 17, 2007 MEMORANDUM FOR FROM: Inspector General S U BJ ECT: INFORMATION: Audit Report on "Confirmatory Bioassay Testing at Selected Sites" BACKGROUND The Department of Energy maintains a significant inventory of radioactive substances at facilities throughout the United States. To help ensure the safety of its workforce, the Department established a two-tiered approach to biological or "bioassay" testing of workers to determine whether and to what extent they may have absorbed radioactive material. The more intense process mandates biological testing and applies to the

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Audit Report: IG-0758  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2007 2, 2007 MEMORANDUM FOR FROM: Inspector General SUBJECT: INFORMATION: Audit Report on "The National Nuclear Security Administration's Implementation of the Federal Information Security Management Act" BACKGROUND The National Nuclear Security Administration's (NNSA) mission includes maintaining and enhancing the U.S. nuclear weapons stockpile, reducing global danger from weapons of mass destruction, and providing safe and effective nuclear propulsion. To achieve its mission goals, the NNSA utilizes many classified and unclassified computer networks and individual systems. Given the sensitivity of the infonnation residing on these networks and systems, strong cyber security measures are essential for protecting operational, personally identifiable, and other critical data from compromise. In Fiscal

142

Audit Report: IG-0805  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Practice at the Southeastern, Practice at the Southeastern, Southwestern, and Western Area Power Administrations DOE/IG-0805 November 2008 Department of Energy Washington, DC 2 0 5 8 5 November 2 0 , 2008 MEMORANDUM FOR FROM: lnspector General SUBJECT: Audit Report on "Cyber Security Risk Management Practices at the Southeastern, Southwestern, and Western Area Power Administrations" BACKGROUND The Southeastern, Southwestern, and Western Area Power Administrations provide electrical power to customers in 29 states. To support this critical function, the Power Marketing Administrations (PMAs) utilize infornlation systems to conduct various activities, including financial management, marketing, and transferring wholesale electrical power across the Nation's electrical grids. In particular, Southwestern and

143

Audit Report: IG-0807  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Practices at the Bonneville Power Practices at the Bonneville Power Administration DOE/IG-0807 December 2008 Department of Energy Washington, DC 20585 December 9, 2 0 0 8 MEMORANDUM FOR THE SECRETARY FROM: Inspector General SUBJECT: Audit Report on "Cyber Security Risk Management Practices at the Bonneville Power Administration" BACKGROUND The Bonneville Power Administration (Bonneville) provides electrical power to millions of custoniers in eight states in the Pacific Northwest. To support this critical function, Bonneville makes extensive use of a number of information systems to conduct various activities, including financial management, operation of extensive electricity transmission systems, and marketing and transferring wholesale electrical power. Some of

144

Audit Report: IG-0787  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department's Cyber Security The Department's Cyber Security Incident Management Program DOE/IG-0787 January 2008 Department sf Energy Washington, DC 20585 January 1 6 , 2008 MEMORANDUM FOR THE, SECRETARY FROM: /%* Greg y H. riedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department's Cyber Security Incident Management Program'' BACKGROUND The Department of Energy operates numerous interconnected computer networks and systems to help accon~plish its strategic missions in the areas of energy, defense, science, and the environment. These systems are frequently subjected to sophisticated cyber attacks that could potentially affect the Department's ability to carry out its mission. During Fiscal Year 2006, the Department experienced 132 incidents of sufficient severity

145

Audit Report: OAS-FS-11-02 | Department of Energy  

Office of Environmental Management (EM)

the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related...

146

Audit Report: OAS-FS-09-02 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

presents the results of the independent certified public accoutants' audit of the Federal Energy Regulatory Commission (Commission) Fiscal Year 2008 and 2007 balance sheet and the...

147

Building Energy Software Tools Directory: National Energy Audit (NEAT)  

NLE Websites -- All DOE Office Websites (Extended Search)

National Energy Audit (NEAT) National Energy Audit (NEAT) A user-friendly, advanced computer audit, the National Energy Audit Tool (NEAT) has been developed by the Buildings Technology Center at Oak Ridge National Laboratory (ORNL) for the U.S. Department of Energy�s (DOE�s) Weatherization Assistance Program. The computer program is designed for use by State agencies and utilities to determine the most cost-effective retrofit measures for single-family and small multi-family site-built homes to increase the energy efficiency and comfort levels. Examines over 45 envelope, equipment, and baseload measures ranked by SIR after accounting for their interactions. Version 7.x, available in 2001, is fully Windows� compatible with data base format storage of all information and results.

148

Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity. To fulfill the Office of Inspector General's audit responsibilities, we contracted with the independent public accounting firm of KPMG LLP (KPMG) to conduct the audit, subject to our review. KPMG is responsible for expressing an opinion on the

149

Environmental audit of the Savannah River Ecology Laboratory (SREL)  

SciTech Connect

This report documents the results of the environmental audit conducted at the Savannah River Ecology Laboratory (SREL) at the Savannah River Site (SRS), principally in Aiken and Barnwell Counties, South Carolina. The audit was conducted by the US Department of Energy`s (DOE`s), Office of Environmental Audit (EH-24), beginning September 13, 1993, and ending September 23, 1993. The scope of the audit at SREL was comprehensive, addressing environmental activities in the technical areas of air; surface water/drinking water; groundwater/soil, sediment, and biota; waste management; toxic and chemical materials; inactive Waste sites; radiation; quality assurance; and environmental management. Specifically assessed was the compliance of SREL operations and activities with Federal, state, and local regulations; DOE Orders; and best management practices.

Not Available

1993-09-01T23:59:59.000Z

150

Environmental auditing of dross tollers: What can the toller expect  

SciTech Connect

The tolling, or processing for a fixed fee, of aluminum drosses to recover the metal units is a common practice in the Aluminum Industry. The Dross Toller is acting for the owner, and since most dross processes result in material going to landfill, it is important for the owner of the dross to insure that the toller is processing the material and handling waste disposal in an environmentally responsible manner. The paper discusses the Dross Toller Audit Program, first from the Reynolds Metals Company perspective. Included are the reasons the company deems it necessary to audit and a description of the items covered during the audit. Finally, there will be a discussion of the audit from the Tollers perspective -- what the Toller can expect when the auditor arrives.

Gwinner, D.S. [Reynolds Metals Co., Richmond, VA (United States)

1995-12-31T23:59:59.000Z

151

Audits & Inspections | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Audits & Inspections Audits & Inspections Audits & Inspections Audits & Inspections The Office of Audits and Inspections provides all internal and contracted audit activities, inspections, and reviews for Department programs and operations, including the National Nuclear Security Administration (NNSA) and the Federal Energy Regulatory Commission (FERC). The Office also performs all OIG intelligence oversight and reporting as required by Executive Order and statue. The Office works as an agent for positive change and continuous improvement in the Department's management and program operations; and strives to provide reliable, credible financial and performance information to senior Department management, the Congress and taxpayers. The Office of Audits and Inspections consists of a Headquarters

152

Routine environmental audit of the Sandia National Laboratories, California, Livermore, California  

SciTech Connect

This report documents the results of the Routine Environmental Audit of the Sandia National Laboratories, Livermore, California (SNL/CA). During this audit the activities the Audit Team conducted included reviews of internal documents and reports from preview audits and assessments; interviews with US Department of Energy (DOE), State of California regulators, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted from February 22 through March 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements. The audit`s functional scope was comprehensive and included all areas of environmental management and a programmatic evaluation of NEPA and inactive waste sites.

Not Available

1994-03-01T23:59:59.000Z

153

A Guide to Energy Audits  

SciTech Connect

Energy audits are a powerful tool for uncovering operational and equipment improvements that will save energy, reduce energy costs, and lead to higher performance. Energy audits can be done as a stand-alone effort or as part of a larger analysis across a group of facilities, or across an owner's portfolio. The purpose of an energy audit (sometimes called an 'energy assessment' or 'energy study') is to determine where, when, why and how energy is used in a facility, and to identify opportunities to improve efficiency. Energy auditing services are offered by energy services companies (ESCOs), energy consultants and engineering firms. The energy auditor leads the audit process but works closely with building owners, staff and other key participants throughout to ensure accuracy of data collection and appropriateness of energy efficiency recommendation. The audit typically begins with a review of historical and current utility data and benchmarking of your building's energy use against similar buildings. This sets the stage for an onsite inspection of the physical building. The main outcome of an energy audit is a list of recommended energy efficiency measures (EEMs), their associated energy savings potential, and an assessment of whether EEM installation costs are a good financial investment.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

154

Audit Report: IG-0419 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19 19 Audit Report: IG-0419 April 6, 1998 The Department of Energy's Peer Review Practices Fulfilling the requirements of the Government Performance and Results Act of 1993 has presented Federal science agencies with the challenge of defining ways to quantify and evaluate the outcomes of research. Measuring research program performance is particularly important for the Department of Energy because of its substantial investment (approximately $7 billion in Fiscal Year 1996) in research and development activities. The Research Roundtable, in 1995, observed that the results of research could be evaluated using the performance indicators of relevance, productivity, and quality. One method for doing so is formal, objective evaluation by independent reviewers, or peer review. The objective of the audit was to

155

Steam Path Audits on Industrial Steam Turbines  

E-Print Network (OSTI)

steam Path Audits on Industrial steam Turbines DOUGLAS R. MITCHELL. ENGINEER. ENCOTECH, INC., SCHENECTADY, NEW YORK ABSTRACT The electric utility industry has benefitted from steam path audits on steam turbines for several years. Benefits... not extend the turbine outage. To assure that all of the turbine audit data are available, the audit engineer must be at the turbine site the day the steam path is first exposed. A report of the opening audit findings is generated to describe the as...

Mitchell, D. R.

156

Preparation for a Software Quality Audit | Department of Energy  

Office of Environmental Management (EM)

Preparation for a Software Quality Audit Preparation for a Software Quality Audit This document will enable a site to prepare for a software quality audit by providing specific...

157

The audit checklist: Your key to audit success  

SciTech Connect

As the old saying goes, If you have no objective, any road will take your there.'' So it is with the audit checklist. The checklist is the primary tool for providing order to Quality Assurance audit activities. With a well-planned and well-defined checklist, success is achievable. Without a checklist, the auditor has a disjointed, disorganized activity and no place to document his or her failed efforts. A number of formal quality programs which include audits as one of their program elements require the audit to be performed using a checklist or procedures to document what the auditor reviewed and what he or she found. It is the intent of this paper to provide the reader with the some insight as to the value of the checklist; the varieties of checklists that can be constructed; the pitfalls of improper application; and the success that can be achieved when the checklist has been properly researched, developed, and deployed.

Maday, J.H. Jr.

1992-02-01T23:59:59.000Z

158

The audit checklist: Your key to audit success  

SciTech Connect

As the old saying goes, ``If you have no objective, any road will take your there.`` So it is with the audit checklist. The checklist is the primary tool for providing order to Quality Assurance audit activities. With a well-planned and well-defined checklist, success is achievable. Without a checklist, the auditor has a disjointed, disorganized activity and no place to document his or her failed efforts. A number of formal quality programs which include audits as one of their program elements require the audit to be performed using a checklist or procedures to document what the auditor reviewed and what he or she found. It is the intent of this paper to provide the reader with the some insight as to the value of the checklist; the varieties of checklists that can be constructed; the pitfalls of improper application; and the success that can be achieved when the checklist has been properly researched, developed, and deployed.

Maday, J.H. Jr.

1992-02-01T23:59:59.000Z

159

Effects of 'Limited Product Line Audits'  

E-Print Network (OSTI)

changes required in piping or storage • Replace failed compressor with new similar unit – 5% gain in efficiency. What Kind of Financial Results Can Be Expected from a Professional Compressed Air System Audit? Compressed air is a very... inefficient transfer of energy. The minimum ratio in the normal 100- psig class air system requires about 8 hp of electrical energy to create 1 hp of work with compressed air. Broad experience has shown us processes that require from 15 hp up to 70 hp...

Van Ormer, H.

2006-01-01T23:59:59.000Z

160

Auditing RLAs Statistics Party-List Audits D'Hondt BPA Denmark Risk-Limiting Audits for Party-List Elections  

E-Print Network (OSTI)

Auditing RLAs Statistics Party-List Audits D'Hondt BPA Denmark Risk-Limiting Audits for Party of Denmark Copenhagen, Denmark 21 November 2013 #12;Auditing RLAs Statistics Party-List Audits D'Hondt BPA Statistics Party-List Audits D'Hondt BPA Denmark All vote counting methods can make mistakes · Most concerns

Stark, Philip B.

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Audit Report: IG-0750  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Regulatory Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams DOE/IG-0750 December 2006 Department of Energy Washington, DC 20585 December 18, 2006 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY FROM: Inspector General SUBJECT: INFORMATION: Audit Report on "The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams" BACKGROUND Pursuant to the Federal Power Act, the Federal Energy Regulatory Commission (FERC) regulates certain aspects of non-Federal hydroelectric dams. FERC is required to ensure the safety, stability. and integrity of these dams with the goal of protecting life, health, and property from, among other things, instances of sabotage and vandalism. To meet these requirements, FERC developed its Dam Safety and Security Programs to inspect and review

162

Audit Report: IG-0771  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Security Over Personally Identifiable Security Over Personally Identifiable Information DOE/IG-0771 July 2007 Department of Energy 'Sv'ashinyton, DC 20585 J u l y 30, 2007 MEMORAhTDUM FOR FROM: inspector General SUBJECT: INFORMATION: Audit Report on "Security over Personally Identifiable Information" Industry experts have reported that more than 100 million personal privacy records have been lost or stolen over the past two years, including information maintained by corporations, educational institutions, and Federal government agencies. In fact, over the past several years, the Department of Energy has experienced the loss of personal privacy records. On June 23,2006, in response to security incidents involving the loss or compromise of sensitive personal information by several Federal agencies, the Office of

163

Audit Report: IG-0752  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certification and Accreditation of Certification and Accreditation of Unclassified Information Systems DOE/IG-0752 January 2007 Department of Energy Washington, DC 20585 January 3, 2007 MEMORANDUM FOR THF, SECRETARY / k c , A ~ n 1 7 FROM: Greg ry H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Certification and Accreditation of Unclassified Information Systems" BACKGROUND Inforn~ation systems are essential to accomplishing the Department of Energy's environmental, energy, and national security-related missions. Actions to protect these systems from increasingly sophisticated attacks have become critically important to the Department and each of its subordinate organizations. The certification and accreditation (C&A) process, required by Federal law and Departmental guidance, is designed to

164

Audit Report: IG-0743  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 - &i Grounds at the Hanford Site October 2006 Department of Energy Washington, DC 20585 October 18, 2006 MEMOKilNDUM FOR THE SECRETARY FROM: reg ry . Friedman Ajakcl, Inspector General SIJBJ EC-1': INFORMATION: Audit Report on " Kemediatio~i of the Waste Burla1 Grounds at the Hanford Site" BACKGKOUN D In the lc!50's and 19601s, operations at the Department of Energy's Hanfortl. Washington Site gencr;ltcd large amounts of radioactive waste. tianford cstuhlished waste burial grounds, designated as sites 6 1 8- I O and 6 18- 1 1 , which received n ~ ~ c l e n r waste from fuel Libric,ltion research and developn~ent activities during this period. Based on historical inl<,rniation available about the origin of the waste, the burial gl-ounds,

165

Audit Report: IG-0786  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy's Receipt of Department of Energy's Receipt of Royalty Oil DOE/IG-0786 January 2008 Department of Energy Washington, DC 20585 January 4 , 2008 MEMORANDUM FOR THE SECRETARY FROM: reg y . rledman Inspector General SUBJECT: INFORMATION: Audit Report on the "Department of Energy's Receipt of Royalty Oil" BACKGROUND The Department of Energy's Strategic Petroleum Reserve is a critical component of this Nation's energy security strategy. Established in 1975 in the aftermath of the oil embargo, the Reserve is one of the primary means of assuring U.S. energy stability and security in the event of a petroleum production or import disruption. The Department of Interior operates a Royalty-in-Kind program designed to handle oil

166

Audit Report: IG-0781  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Continuity of Operations at Bonneville Power Administration DOE/IG-0781 November 2007 Department of Energy Washington, DC 20585 November 6 , 2007 MEMORANDUM FOR THE ADMINISTRATOR, BONNEVILLE POWER ADMNISTRATION - 2 L ~ ; ; K L & L ~ , ; / FROM: Grego d H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Continuity of Operations at Bonneville Power Administration" BACKGROUND 'lhe Bonneville Power Administration (Bonneville) markets and delivers wholesale hydroelectric power. Currently, Bonneville provides about 40 percent of the power sold in the Pacific Northwest region of the U.S. and it operates over three-fourths of the region's high-voltage transmission facilities. In the event of a major disruption to its nonnal operations, Bonneville must be prepared

167

Audit Report: IG-0783  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Beryllium Surface Contamination at Beryllium Surface Contamination at the Y-12 National Security Complex DOE/IG-0783 December 2007 Department of Energy Washington, DC 20585 December 1 7 , 2007 MEMORANDUM FOR TI4 SECRETARY FROM: Gregory &- H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Beryllium Surface Contamination at the Y- 12 National Security Complex" INTRODUCTION AND OBJECTIVE Since the 1950s, beryllium processing has been an important part of the mission of the Department of Energy's Y- 12 National Security Complex in Oak Ridge, Tennessee. Y-12 has made widespread use of beryllium in its activities. As a consequence, the Department's worker safety programs have recognized the possibility that beryllium remains in buildings as

168

Audit Report: IG-0768  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Contractor Acquisition and Facility Contractor Acquisition and Management of Information Technology Hardware DOE/IG-0768 June 2007 Department of Energy Washington, DC 20585 J u n e 2 2 , 2007 MEMORANDUM FOR THE SECRETARY FROM: + e Greg ry . n e man Inspector General SUBJECT: INFORMATION: Audit Report on "Facility Contractor Acquisition and Management of Information Technology Hardware" BACKGROUND The Department of Energy relies heavily on information technology (IT) to accomplish its science, weapons, energy supply and environmental mission objectives. In the past three years, the Department has spent more than $400 million on IT hardware to facilitate these efforts. Items routinely acquired by the Department included desktop and laptop computers and associated peripherals, personal digital assistants, and network

169

Audit Report: IG-0810  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potential Uses for Depleted Uranium Potential Uses for Depleted Uranium Oxide DOE/IG-0810 January 2009 Department of Energy Washington, DC 20585 January 9 , 2009 MEMORANDUM FOR - I THYSECRETARY - FROM: Inspector General SUBJECT': INFORMATION: Audit Report on "Potential Uses For Depleted Uranium Oxide" BACKGROUND The Department of Energy's Office of Environmental Management (EM) manages approximately 700,000 metric tons of depleted uranium hexafluoride at the gaseous diffusion plants located near Paducah, Kentucky. and Portsmouth, Ohio. It plans to convert the depleted uranium hexafluoride to a stable material. The conversion process will produce approximately 55 1,000 metric tons of depleted uranium oxide - a relatively stable form that can be handled and disposed of by direct burial or, potentially, used in

170

Behavioral Perspectives on Home Energy Audits: The Role of Auditors, Labels, Reports, and Audit Tools on Homeowner Decision Making  

E-Print Network (OSTI)

Perspectives  on  Home  Energy  Audits         Page   158  in  the  effect  of  home  energy  audits:  Theory  and  Perspectives  on  Home  Energy  Audits         Page   159  

Ingle, Aaron

2013-01-01T23:59:59.000Z

171

Audit Report: IG-0839 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Audit Report: IG-0839 September 20, 2010 Environment and Worker Safety Control Systems at the National Nuclear Security Administration's Kansas City Plant The Department of Energy's National Nuclear Security Administration's Kansas City Plant is located within the Bannister Federal Complex in Kansas City, Missouri, which also houses the General Services Administration and other agencies. Current and former employees and families of former employees of the Bannister Complex have recently raised concerns about serious illnesses, in some cases leading to death, resulting from exposure to toxins at the Complex. Due to the seriousness of the health issues that were raised, the Office of Inspector General initiated an audit to determine whether the Kansas City Plant had controls in place to protect

172

Audit Report: IG-0512 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Audit Report: IG-0512 July 10, 2001 Recruitment and Retention of Scientific and Technical Personnel The Department of Energy (Department), as a result of budget reduction and Government-wide downsizing goals, reduced Federal staff by about 24 percent between 1995 and 1998. This massive downsizing created mission-critical staffing needs in a number of technical areas. As of May 2001, the Department's Federal workforce consisted of about 9,900 permanent employees, including about 4,600 scientific and technical staff. In a November 2000 report, the Office of Inspector General identified Human Capital as one of the most significant challenges facing the Department. The purpose of this audit was to determine whether the Department has been able to recruit and retain scientific and technical personnel.

173

Audit Report: IG-0501 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Audit Report: IG-0501 May 2, 2001 Remediation and Closure of the Miamisburg Environmental Management Project With the end of the cold war, the Miamisburg Environmental Management Project (MEMP), formerly known as the Mound Plant, was transferred by the Department of Energy (Department), from Defense Programs to Environmental Management. The emphasis at MEMP is now accelerated cleanup and transition of facilities and property to the local community. Congress requires the Department to request adequate funding to keep the project on schedule for closure by 2006 or earlier. Under these provisions, any savings resulting from the accelerated closure of the MEMP can be retained and used for cleanup activities at other Department closure sites. Audit Report: IG-0501

174

INTERNAL AUDIT ACTIVITY ANNUAL REPORT  

E-Print Network (OSTI)

to another great year! Sincerely, Stacie Tronto, MBA, CISA, CIA, CFE Chief Audit Officer/Executive Director), and Certified Fraud Examiner (CFE). Three employees have a Master of Business Administration (MBA) degree

175

Multiple hypothesis evaluation in auditing  

E-Print Network (OSTI)

In many audit tasks, auditors evaluate multiple hypotheses to diagnose the situation. Research suggests this is a complex task that individuals have difficulty performing. Further, there is little guidance in professional ...

Srivastava, Rajendra P.; Wright, Arnold; Mock, Theodore J.

2002-11-01T23:59:59.000Z

176

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 28550 of 28,560 results. 41 - 28550 of 28,560 results. Download Audit Evaluation Report: IG-0830 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2009 http://energy.gov/ig/downloads/audit-evaluation-report-ig-0830 Download Audit Report: WR-B-98-01 Audit Of The Radioactive Liquid Waste Treatment Facility Operations At The Los Alamos National Labratory http://energy.gov/ig/downloads/audit-report-wr-b-98-01 Download Audit Report: IG-0607 Plutonium-238 Production http://energy.gov/ig/downloads/audit-report-ig-0607 Download US-China clean energy report http://energy.gov/pi/office-policy-and-international-affairs/downloads/us-china-clean-energy-report Download Audit Report: CR-B-97-04 Audit of Controls Over the ADP Support Services Contract http://energy.gov/ig/downloads/audit-report-cr-b-97-04-0

177

Alternative Fuels Data Center: Video Download Help  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

AFDC » Case Studies AFDC » Case Studies Printable Version Share this resource Send a link to Alternative Fuels Data Center: Video Download Help to someone by E-mail Share Alternative Fuels Data Center: Video Download Help on Facebook Tweet about Alternative Fuels Data Center: Video Download Help on Twitter Bookmark Alternative Fuels Data Center: Video Download Help on Google Bookmark Alternative Fuels Data Center: Video Download Help on Delicious Rank Alternative Fuels Data Center: Video Download Help on Digg Find More places to share Alternative Fuels Data Center: Video Download Help on AddThis.com... Video Download Help Learn how to download, watch, burn, and share videos. Download Videos To download videos for a PC, right-click a Windows Media Video (WMV) link and select "Save Target As..." from the shortcut menu.

178

Alternative Fuels Data Center: Data Downloads  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Tools Tools Printable Version Share this resource Send a link to Alternative Fuels Data Center: Data Downloads to someone by E-mail Share Alternative Fuels Data Center: Data Downloads on Facebook Tweet about Alternative Fuels Data Center: Data Downloads on Twitter Bookmark Alternative Fuels Data Center: Data Downloads on Google Bookmark Alternative Fuels Data Center: Data Downloads on Delicious Rank Alternative Fuels Data Center: Data Downloads on Digg Find More places to share Alternative Fuels Data Center: Data Downloads on AddThis.com... Data Downloads To download data related to alternative fuels and advanced vehicles, follow the steps below. Step 1. Choose data to download Choose the dataset and file format you want to download. Dataset: Select dataset Alternative fuel stations

179

Building Energy Software Tools Directory: AUDIT  

NLE Websites -- All DOE Office Websites (Extended Search)

AUDIT AUDIT AUDIT logo. Calculates monthly and annual heating and cooling costs for residential and light commercial buildings. Virtually any type of cooling and heating system can be simulated by AUDIT including standard DX, evaporative, air source heat pumps, water source heat pumps, and all types of fossil fueled furnaces and boilers (both modulating and on/off controlled). An optional version of AUDIT with appliance capabilities can calculate appliance and hot water energy use as well. AUDIT uses monthly bin weather data and full load cooling hours in its calculations. Weather data for hundreds of cities throughout the world are built-in to AUDIT and additional weather data can be easily added. Along with calculating energy costs, AUDIT also performs an economic analysis that allows you to compare system types and costs over

180

Audit Report: IG-0418 | Department of Energy  

Office of Environmental Management (EM)

18 Audit Report: IG-0418 March 13, 1998 Audit of Alternatives to Testing at the Tonopah Test Range The Office of Inspector General has issued several recent reports concerning ways...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Audit Report: IG-0435 | Department of Energy  

Energy Savers (EERE)

Audit Report: IG-0435 Audit Report: IG-0435 January 7, 1999 Review of the U.S. Department of Energy's Aircraft Activities On October 19, 1998, you asked that the Office of...

182

Audit Report: IG-0429 | Department of Energy  

Energy Savers (EERE)

Audit Report: IG-0429 Audit Report: IG-0429 October 16, 1998 The U.S. Department of Energy's X-Change 1997: The Global D&D Marketplace Conference The Department of Energy and...

183

Audit Report: IG-0443 | Department of Energy  

Office of Environmental Management (EM)

443 Audit Report: IG-0443 April 5, 1999 Audit of the U.S. Department of Energy's Funds Distribution and Control System at the Federal Energy Technology Center In Fiscal Year 1998,...

184

Methods of Energy Auditing for Dwellings  

Science Journals Connector (OSTI)

Basic methods are given for energy auditing on dwellings. The heat-transfer resistances of ... structures are basic characteristics to be determined in energy auditing for dwellings and industrial buildings. Deta...

N. I. Khanov; L. A. Semenov; Yu. A. Chistyakov

2002-06-01T23:59:59.000Z

185

Writing User-Friendly Energy Audit Reports  

E-Print Network (OSTI)

Energy audits don't save money and energy for companies unless the recommendations are implemented. Audit reports should be designed to encourage implementation, but often they impede it instead. In this paper, the authors discuss their experience...

Capehart, L. C.; Capehart, B. L.

186

Our Favorite Energy Management Opportunities: A Review of Over 150 Energy Audits of Industrial Firms  

E-Print Network (OSTI)

conducted. A data base has been constructed containing the results of the audits. On the average, the audits have identified savings of 15% of present energy costs and implementation rates are about 60%. (A recent job change is expanding these activities...

Webb, R. E.; Lewis, M.; Spivey, V.; Knight, N.; Turner, W. C.

187

Does Customer Auditing Help Chinese Workers?  

E-Print Network (OSTI)

Does Customer Auditing Help Chinese Workers? Guojun He* andgovernment training and help, (4) fines and punishments, (5)

He, Goujun; Perloff, Jeffrey M.

2012-01-01T23:59:59.000Z

188

Audit Savvy Session 2.1  

E-Print Network (OSTI)

/sponsor audits · Desk reviews · Investigations · Quarterly reports are audits too! 7/28/2010 July 2010 - Audit transfers cannot be used as a management tool · Must meet the A-21 test of being reasonable, allocable · Help determine releva

Firestone, Jeremy

189

Auditing a database under retention policies  

Science Journals Connector (OSTI)

Auditing the changes to a database is critical for identifying malicious behavior, maintaining data quality, and improving system performance. But an accurate audit log is an historical record of the past that can also pose a serious threat to privacy. ... Keywords: Auditing, Privacy, Retention policy

Wentian Lu; Gerome Miklau; Neil Immerman

2013-04-01T23:59:59.000Z

190

Final Draft of RACER Audit  

SciTech Connect

This document describes the approach Waste and Environmental Services - Environmental Data and Analysis plans to take to resolve the issues presented in a recent audit of the WES-EDA Environmental Database relative to the RACER database. A majority of the issues discovered in the audit will be resolved in May 2011 when the WES-EDA Environmental Database, along with other LANL databases, are integrated and moved to a new vendor providing an Environmental Information Management (EIM) system that allows reporting capabilities for all users directly from the database. The EIM system will reside in a publicly accessible LANL cloud-based software system. When this transition occurs, the data quality, completeness, and access will change significantly. In the remainder of this document, this new structure will be referred to as the LANL Cloud System In general, our plan is to address the issues brought up in this audit in three ways: (1) Data quality issues such as units and detection status, which impinge upon data usability, will be resolved as soon possible so that data quality is maintained. (2) Issues requiring data cleanup, such as look up tables, legacy data, locations, codes, and significant data discrepancies, will be addressed as resources permit. (3) Issues associated with data feed problems will be eliminated by the LANL Cloud System, because there will be no data feed. As discussed in the paragraph above, in the future the data will reside in a publicly accessible system. Note that report writers may choose to convert, adapt, or simplify the information they receive officially through our data base, thereby introducing data discrepancies between the data base and the public report. It is not always possible to incorporate and/or correct these errors when they occur. Issues in the audit will be discussed in the order in which they are presented in the audit report. Clarifications will also be noted as the audit report was a draft document, at the time of this response.

Paige, Karen Schultz [Los Alamos National Laboratory; Gomez, Penelope E. [Los Alamos National Laboratory

2011-01-01T23:59:59.000Z

191

For Profit Audits - Information Related to 12/21/11 Federal Register Notice  

NLE Websites -- All DOE Office Websites (Extended Search)

For Profit Audits - Information Related to 12/21/11 Federal For Profit Audits - Information Related to 12/21/11 Federal Register Notice For Profit Audits - Information Related to 12/21/11 Federal Register Notice Attached are copies of the 7 comments received to Federal Register notice Document Number 2011-32622, a copy of the matrix of the comments, a copy of DOE's responses to the comments, and marked up versions of the draft guidance showing the content changes to Parts I and II of guidance which were made as a result of the comments received. There were no changes to Parts III and IV of the guidance as a result of the comments received. For-profit comments and responses_final april 2012.pdf For-Profit_Audit_Guidance_(Part_I)_2011 editted 042612_1.pdf For-Profit_Audit_General_Compliance_Supplement_(Part_II)_2011 editted

192

Audit Report: IG-0413 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Audit Report: IG-0413 October 17, 1997 Audit of Funding for Advanced Radioisotope Power Systems The Department of Energy's (Department) Advanced Radioisotope Power Systems Program maintains the sole national capability and facilities to produce radioisotope power systems for the National Aeronautics and Space Administration (NASA), the Department of Defense, and other Federal agencies. For the past seven years the program emphasis has been on providing power systems for NASA's Cassini mission to Saturn, which was launched earlier this month. We initiated this audit to determine whether the Department received proper reimbursement from NASA for the radioisotope power systems produced. Audit Report: IG-0413 More Documents & Publications Audit Report: IG-0540

193

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 22420 of 29,416 results. 11 - 22420 of 29,416 results. Download Microsoft Word- 1 Million Electric Vehicle Report Final http://energy.gov/downloads/microsoft-word-1-million-electric-vehicle-report-final Download Z:\ENROLL\H1.ENR http://energy.gov/downloads/zenrollh1enr Download Audit Report: IG-0546 Accounting for Sealed Sources of Nuclear Material Provided to Foreign Countries http://energy.gov/ig/downloads/audit-report-ig-0546 Download Audit Report: ER-B-97-01 Audit of Economic Development Grants and a Cooperative Agreement with East Tennessee Not-For-Profit Organizations http://energy.gov/ig/downloads/audit-report-er-b-97-01 Download Audit Report: CR-B-97-01 Audit of Department of Energy's Warehouse Space http://energy.gov/ig/downloads/audit-report-cr-b-97-01 Download Diversity and Inclusion Strategic Plan 2012- 2015

194

Audit Report: IG-0545 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Audit Report: IG-0545 March 20, 2002 Cyber-Related Critical Infrastructure Identification and Protection Measures In recent years, critical infrastructure protection has taken on increasing national importance as attacks and resulting damage to the country's critical cyber interests have increased. In 1998, in response to these threats, the Administration issued a directive to demonstrate the Federal government's commitment to protecting critical assets. More recently, President Bush signaled his support for critical infrastructure protection efforts by issuing Executive Order 13231, Critical Infrastructure Protection in the Information Age. The President's order seeks to strengthen the protection of critical information systems, including emergency preparedness communications, and the physical assets that support

195

Audit Report: IG-0509 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Audit Report: IG-0509 June 28, 2001 Report on the Integrated Planning, Accountability, and Budgeting System - Information System The Department of Energy (Department) is responsible for the world's largest environmental remediation program resulting from the legacy of this Nation's nuclear weapons program and government-sponsored nuclear energy research activities. About $6 billion, or one-third of the Department's annual budget, is devoted to this critical mission component. To support its mission, the Department's Office of Environmental Management (EM) developed a corporate-level project management system known as the Integrated Planning, Accountability, and Budgeting System - Information System (IPABS-IS). This system, coupled with the EM Corporate Database, was

196

Audit Report: IG-0483 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Audit Report: IG-0483 September 22, 2000 The Department's "Implementation of Presidential Decision Directive 63, Critical Infrastructure Protection" In 1997, a Presidential Commission on Critical Infrastructure Protection concluded that the national critical infrastructures - energy, banking, transportation, vital human services, and telecommunications - were vulnerable to attack through the malicious use of commonly available tools. On May 22, 1998, as a result of the Commission's findings, the President issued Presidential Decision Directive 63 (PDD 63), Critical Infrastructure Protection. PDD 63 required Federal agencies to take action to eliminate significant vulnerabilities, especially cyber-related, and to assure the continuity and viability of the nation's critical infrastructures. The

197

Audit Report: IG-0840 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40 40 Audit Report: IG-0840 September 23, 2010 The Department of Energy's Audit Resolution and Follow-up Process The Department of Energy's audit resolution and follow-up process provides an important mechanism for assisting management in improving the performance of the Department and its programs. Over the last 5 years, the Office of Inspector General (OIG) has completed over 350 audits, which included recommendations for corrective actions or improvements in programs, operations, and management functions. Ensuring that these recommendations are addressed and resolved timely is a critical component of the audit process. With this goal in mind, Department Order 224.3, Audit Resolution and Followup Program, generally requires that audit reports and all associated recommendations be closed within one year and that

198

Conducting Your Own Energy Audit  

E-Print Network (OSTI)

Why should you or anyone be interested in conducting a time intensive energy audit. What equipment is needed? When should you get started? Who should do it? The answer to Why is that energy costs are cutting into a company’s profit every minute...

Phillips, J.

2008-01-01T23:59:59.000Z

199

Auditing of Programs and Operations  

Directives, Delegations, and Requirements

To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Cancels DOE O 224.2.

2007-11-09T23:59:59.000Z

200

Energy audit of irrigation networks  

Science Journals Connector (OSTI)

The relationship between water and energy in water distribution systems (WDS) has been a growing concern among energy and water experts. Among the different strategies to improve water–energy efficiency in water distribution networks, energy audits are of paramount importance as they quantify water flow requirements, the amount of energy consumed to meet demand and leakage and friction losses. Previous work has presented the energy audit process for urban WDS and this energy audit is extended to irrigation networks here. This work analyses the most common types of irrigation emitters (sprinklers and pressure compensating and non-pressure compensating drippers), hydrant specifications, irrigation management systems (on-demand or rigid scheduled), and energy losses due to friction in pipes, control valves and irrigation hydrants. The energy audit does not assess whether management of the network is optimal, but analyses the energy consumption. Some of the performance indicators have already been defined for agricultural water networks, some are identical to those of urban WDS, but in addition, a new one is presented that disaggregates the energy dissipated into three terms, energy losses in pipelines, in hydraulic valves and in irrigation hydrants. These indicators show information necessary to better understand the performance of the irrigation network under study, to carry out a deep analysis of energy consumption and to allow for comparison with similar systems. The paper presents the analysis of a real case study conducted on the irrigation network of the garden of the Universidad Politécnica de Valencia.

Miguel A. Pardo; Juan Manzano; Enrique Cabrera; Jorge García-Serra

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Energy Audits of Local Government Buildings (Louisiana DNR)  

E-Print Network (OSTI)

to their buildings in the form of a written audit report resulting from an on-site survey of each building. The reports are provided at no cost to the local government. Because funds available to local governments for implementation of energy conservation... number of clients with detailed audit reports requiring a large number of professional and clerical man-hours per report, and serving a large number of clients with less detailed reports that require fewer man-hours for site visits, analysis...

Bruce, A. C.; Lowther, J. D.; Tarver, E.

1987-01-01T23:59:59.000Z

202

Southwestern Federal Power System's Fiscal Year 2010 Financial Statement Audit, OAS-FS-12-10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Financial 10 Financial Statement Audit OAS-FS-12-10 July 2012 Department of Energy Washington, DC 20585 July 30, 2012 MEMORANDUM FOR THE ADMINISTRATOR, SOUTHWESTERN POWER ADMINISTRATION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Southwestern Federal Power System's Fiscal Year 2010 Financial Statement Audit The attached report present the results of the independent certified public accountants' audit of the Southwestern Federal Power System's (SWFPS) combined balance sheets, as of September 30, 2010 and 2009, and the related combined statements of revenues and expenses, changes in net Federal investment and cash flows. To fulfill the Office of Inspector General's (OIG) audit responsibilities, we contracted with the

203

Department of Energy's Nuclear Waste Fund's Fiscal Year 2012 Financial Statement Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Nuclear Waste Fund's Fiscal Year 2012 Financial Statements OAS-FS-13-05 November 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 November 28, 2012 MEMORANDUM FOR THE DIRECTOR, OFFICE OF STANDARD CONTRACT MANAGEMENT, OFFICE OF GENERAL COUNSEL FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Department of Energy's Nuclear Waste Fund's Fiscal Year 2012 Financial Statement Audit" The attached report presents the results of the independent certified public accountants' audit of the Department of Energy's Nuclear Waste Fund's (Fund) Fiscal Year 2012 balance sheet and the

204

Audit Report: ER-B-97-02 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Audit Report: ER-B-97-02 February 14, 1997 Audit of the Department of Energy's Grant for Economic Development at the Mound Plant The downsizing of the Department of Energy's (Department) facilities as a result of the end of the Cold War had a negative impact on communities that were heavily dependent on the Department's operations for economic stability. To lessen the impact, the Department provided financial assistance to local communities through Federal grants and cooperative agreements. The objective of this audit was to determine whether funding provided for economic development at the Mound Plant was used for the Department's intended purposes. Audit Report: ER-B-97-02 More Documents & Publications Audit of Shutdown and Transition of the Mound Plant, IG-0408

205

Downloads: August 6-8, 2013 National Veterans Small Business...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Downloads: August 6-8, 2013 National Veterans Small Business Conference Downloads: August 6-8, 2013 National Veterans Small Business Conference Download materials from the August...

206

The University of Texas Office of Internal Audits  

E-Print Network (OSTI)

Procured in Fiscal Year 2013 31 VII. Reporting Suspected Fraud and Abuse 32 The University of Texas to post the Internal Audit Plan, Internal Audit Annual Report, and Other Audit Information on the Internet the Internal Audit Annual Report on the Office of Internal Audits' internet Web site, http

Texas at Austin, University of

207

Fiscal Year 2011 Audit of the Work Performed Under the Work for Others Program at the Lawrence Berkeley National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Fiscal Year 2011 Audit of the Work Performed Under the Work for Others Program at the Lawrence Berkeley National Laboratory OAS-L-13-10 June 2013 Department of Energy Washington, DC 20585 June 24, 2013 MEMORANDUM FOR THE MANAGER, BERKLEY SITE OFFICE FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Fiscal Year 2011 Audit of the Work Performed Under the Work for Others Program at the Lawrence Berkeley National Laboratory" BACKGROUND The attached report presents the results of the audit of Lawrence Berkeley National Laboratory's (Berkeley) Work for Others (WFO) Program. The Office of Inspector General contracted with

208

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 25710 of 26,764 results. 01 - 25710 of 26,764 results. Download Audit Report: OAS-L-07-18 Executive Compensation at Brookhaven National Laboratory http://energy.gov/ig/downloads/audit-report-oas-l-07-18 Download Audit Report: OAS-L-07-19 Executive Compensation at Selected Office of Science Sites http://energy.gov/ig/downloads/audit-report-oas-l-07-19 Download Audit Report: OAS-L-06-03 Defense Waste Processing Facility Operations at the Savannah River Site http://energy.gov/ig/downloads/audit-report-oas-l-06-03 Download Audit Report: OAS-L-06-07 The Department's Management of United States Enrichment Corporation Site Services http://energy.gov/ig/downloads/audit-report-oas-l-06-07 Download Audit Report: OAS-L-06-12 Sandia National Laboratories' Safeguards and Security Path Forward Management Plan

209

The Federal Energy Regulatory Commission's Fiscal Year 2011 Financial Statement Audit, OAS-FS-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Financial Statement Audit OAS-FS-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2011 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission (Commission) Fiscal Year 2011 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity.

210

The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit, OAS-FS-13-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Regulatory Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-03 November 2012 Department of Energy Washington, DC 20585 November 15, 2012 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) balance sheets as of September 30, 2012 and 2011, and the related statements of net costs, changes in net position, budgetary

211

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 31880 of 31,917 results. 71 - 31880 of 31,917 results. Download Audit Report: OAS-B-03-03 Infrastructure Improvements at the Hanford Site http://energy.gov/ig/downloads/audit-report-oas-b-03-03 Download Audit Report: WR-B-00-06 Hanford Site Radiation and Hazardous Waste Training http://energy.gov/ig/downloads/audit-report-wr-b-00-06 Download Audit Report: IG-0505 Utilization of the Department's Low-Level Waste Disposal Facilities http://energy.gov/ig/downloads/audit-report-ig-0505 Download Audit Report: OAS-M-09-02 Management Controls over the Use of Service Contracts at the Office of River Protection http://energy.gov/ig/downloads/audit-report-oas-m-09-02 Download EA-1429-SA-01: Supplement Analysis Security Perimeter Project http://energy.gov/nepa/downloads/ea-1429-sa-01-supplement-analysis

212

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 4950 of 9,640 results. 41 - 4950 of 9,640 results. Download Audit Report: IG-0611 Waste Reduction Plans for the Advanced Mixed Waste Treatment Project at the Idaho National Engineering and Environmental Laboratory http://energy.gov/ig/downloads/audit-report-ig-0611 Download Audit Report: ER-B-00-02 Security Overtime at the Oak Ridge Operations Office http://energy.gov/ig/downloads/audit-report-er-b-00-02 Download Audit Report: IG-0710 Management of Facility Contractors Assigned to the Washington, D.C. Area http://energy.gov/ig/downloads/audit-report-ig-0710 Download Audit Report: IG-0673 Transuranic Waste Management at Los Alamos National Laboratory http://energy.gov/ig/downloads/audit-report-ig-0673 Download DOE Site Facility Management Contracts Internet Posting http://energy.gov/management/downloads/doe-site-facility-management-contracts-internet-posting

213

Energy Audits in Process Units  

E-Print Network (OSTI)

:$M:.:....-_ Yrs. ---:%:::....__ Plant Dept M 3 Btu/yr $ 1112 Feed Clr Bypass 80 85 40 -0- 0.0 100 80 85 40 -0 1121 Feed Points 180 300 62 -0- 0.0 90 260 385 102 -0 1124 Raw Mtl Hx 500 600 300 20 0.1 50 760 985 402 20 115 Vacuum Pump 3.6 95 1110 200-lb Cond..., There are some key words in this definition; if it is assumed that the members of the audit team the first is "in-depth". An audit of this sort are devoting 30-50% of their time to this responsi is not a superficial review; it does require a bility...

Corwin, J. D.

1980-01-01T23:59:59.000Z

214

1. Revised Guide Chapter 70.4, Cooperative Audit Strategy:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revised Guide Chapter 70.4, Cooperative Audit Strategy: Revised Guide Chapter 70.4, Cooperative Audit Strategy: Establishes a requirement for the contractor to provide an Internal Audit Design for each 5-year period of a contract. The design is to consist of: (1) Organizational placement of the internal audit function to assure functional independence; (2) Size, experience, and educational requirements of audit staff; (3) Audit standards to be applied; (4) (5) (6) allo (7) a. Plan for internal audit function over 5-year period; Plan for audit of allowable costs; Use ofDCAA for supplementing audit of prime or subcontract wable costs; and Schedule for peer review. b. Provides detailed standards for the Annual Audit Plan. c. Provides detailed standards for the Annual Audit Report. 2.AL 2005-04, Class Deviation to Reflect Changes to the Cooperative Audit Strategy,

215

Industrial Energy Audit Basics by an Energy Auditor  

E-Print Network (OSTI)

The purpose of an energy audit is the first step in energy cost control. There are two types of energy audits – Traditional and Investment grades. The process of an energy audit consists of collecting and then processing data, specifying changes...

Phillips, J.

2007-01-01T23:59:59.000Z

216

Preparation for a Software Quality Audit, SQAS | Department of...  

Energy Savers (EERE)

Audit, SQAS Preparation for a Software Quality Audit, SQAS This document will enable a site to prepare for a software quality audit by providing specific guidance. It will also...

217

Coverage of Independent Audits of For-Profit Firms  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

audit, he or she must consider the nature, timing, and extent of his or her own auditing procedures, to avoid unnecessary duplication of the DCAA effort. PART 2. AUDIT OBJECTIVES...

218

#AskEnergySaver: Home Energy Audits | Department of Energy  

Office of Environmental Management (EM)

Energy Audits AskEnergySaver: Home Energy Audits January 24, 2014 - 5:48pm Addthis A home energy audit is the first step to improving your home's energy efficiency. Making energy...

219

Audit unto others hor ellipsis  

SciTech Connect

My first encounter with a quality assurance auditor is reminiscent of an old Dodge commercial. You remember The old sheriff, masked in mirrored sunglasses, paunch hanging over his gun belt, prophesying, You're in a heap o' trouble boy '' Well, my auditor could have been kin to the sheriff; they had the same posture, attitude, and mirrored sunglasses. Plus, my auditor wore a black leather vest and sported a Buffalo Bill'' goatee. While certainly memorable, both gentlemen were far from pleasant. I'm fairly certain that the compliance auditor of old deserved this perceived association with his law enforcement counterpart. Both believed in enforcing the letter of the law, or their interpretations of it. Neither seemed capable of exercising interpretive powers, but instead relied on winning through intimidation, possibly with an eye toward claiming some version of a monthly Quota Award. Is the auditor of today any better perceived Because this first encounter of the worst kind'' made a lasting impression on me, I have dedicated considerable time and effort trying to avoid being perceived as another sheriff when I conduct audits. In my auditing career, I am determined to capitalize on each opportunity to turn negative situations, as experienced by the auditee, into meaningful opportunities for improved performance. I want to treat the auditee the way I want to be treated when I am being audited. (author)

Maday, J.H. Jr.

1992-05-01T23:59:59.000Z

220

Downloads & Patient Materials - HPMC Occupational Health Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Health Education & Wellness Downloads & Patient Materials Ergonomics Fitness & Exercise Men's Health Nutrition Women's Health Health & Productivity Health Calculators &...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Audit Report: IG-0631 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Audit Report: IG-0631 December 12, 2003 Implementation of Indications, Warning, Analysis and Reporting Capability A significant number of the Department of Energy (Department) sites were not taking appropriate action to report computer attacks, probes, or compromises. Specifically, computer incidents were not always being reported to the Computer Incident Advisory Capability (CIAC) as required by Departmental guidance. Office of Inspector General Technology Crimes Section (Technology Crimes) and Federal counterintelligence officials were also not always notified of incidents as appropriate. Audit Report: IG-0631 More Documents & Publications Audit Report: IG-0500 The Department's Cyber Security Incident Management Program, IG-0787 Audit Report: IG-0787

222

Audit Report: IG-0881 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: IG-0881 Audit Report: IG-0881 Audit Report: IG-0881 February 19, 2013 National Nuclear Security Administration Contractor Governance Since July 2007, the Department of Energy (Department) and the National Nuclear Security Administration (NNSA) have required contractors to implement self-assessment systems to measure performance and help ensure effective and efficient mission accomplishment. In essence, contractors assessed and evaluated their own performance with some level of Federal oversight. Our audit found that despite at least 5 years of effort, NNSA and its support offices and site contractors had not yet implemented fully functional and effective contractor assurance systems. During recent Office of Inspector General (OIG) reviews, we identified significant

223

Audit Report: IG-0641 | Department of Energy  

Energy Savers (EERE)

is the cadre of over 4,000 armed personnel responsible for securing the Department's nuclear materials, weapons, and national security-related information. Audit Report:...

224

Audit Report: IG-0451 | Department of Energy  

Energy Savers (EERE)

51 Audit Report: IG-0451 August 13, 1999 Waste Incineration at the Oak Ridge Reservation The Toxic Substances Control Act (TSCA) Incinerator is located at the East Tennessee...

225

Audit Report: IG-0737 | Department of Energy  

Energy Savers (EERE)

37 Audit Report: IG-0737 September 6, 2006 Beryllium Controls at the Oak Ridge National Laboratory The Oak Ridge National Laboratory (Laboratory) did not properly manage activities...

226

Audit Resolution and Follow-Up Program  

Directives, Delegations, and Requirements

This Order establishes requirements and responsibilities for the management of open audits, findings, and recommendations. Cancels DOE 2300.1B.

2005-01-24T23:59:59.000Z

227

Audit Report: IG-0669 | Department of Energy  

Office of Environmental Management (EM)

9 Audit Report: IG-0669 December 14, 2004 Use and Management of Mobile Communications Services The acquisition and use of wireless or mobile communication devises for mission...

228

Review of Selected Home Energy Auditing Tools  

Energy.gov (U.S. Department of Energy (DOE))

This study reviews widely used energy audit tools that are used to evaluate home improvements and to maximize its operational and energy efficiency.

229

Audit Report: IG-0635 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Audit Report: IG-0635 January 13, 2004 Safeguards Over Sensitive Technology The Department of Energy's national laboratories have diverse missions that range from national...

230

Audit Report: IG-0566 | Department of Energy  

Office of Environmental Management (EM)

566 Audit Report: IG-0566 September 9, 2002 National Nuclear Security Administration's Test rediness Program Prior to 1992, the Department of Energy relied on underground testing...

231

Audit Report: IG-0391 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

IG-0391 June 6, 1996 Activities Designed to Recover the Taxpayers' Investment in the Clean Coal Technology Program Audit Report: IG-0391 More Documents & Publications Gregory H....

232

Audit Report: IG-0458 | Department of Energy  

Energy Savers (EERE)

58 Audit Report: IG-0458 February 15, 2000 In-Vitro Bioassay Services at Department of Energy Facilities Federal regulations require that routine bioassay programs be established...

233

Audit Report: IG-0689 | Department of Energy  

Energy Savers (EERE)

89 Audit Report: IG-0689 May 12, 2005 Selected Energy Efficiency and Renewable Energy Projects Energy Efficiency and Renewable Energy (EERE) project officials were not always...

234

Audit Report: IG-0761 | Department of Energy  

Office of Environmental Management (EM)

IG-0761 Audit Report: IG-0761 March 26, 2007 The Department of Energy's Management of Contractor Intergovernmental Personnel and Change of Station Assignments The Department of...

235

Audit Report: IG-0676 | Department of Energy  

Energy Savers (EERE)

6 Audit Report: IG-0676 February 14, 2005 Department of Energy Contractor Home Office Expenses Our review of five contracts for national laboratories and disclosed that the...

236

Audit Report: IG-0454 | Department of Energy  

Energy Savers (EERE)

4 Audit Report: IG-0454 December 15, 1999 Waste Incineration at the Idaho National Engineering and Environmental Laboratory The Waste Experimental Reduction Facility (WERF)...

237

Audit Report: IG-0453 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Audit Report: IG-0453 October 13, 1999 Waste Incineration at the Savannah River Site The Department constructed the Consolidated Incinerator Facility (CIF) at the Savannah River...

238

Audit Report: IG-0588 | Department of Energy  

Energy Savers (EERE)

588 Audit Report: IG-0588 March 3, 2003 Treatment of Mixed Incinerable Waste We found the Department of Energy (Department) was not treating its mixed incinerable solid waste...

239

Audit Report: IG-0613 | Department of Energy  

Energy Savers (EERE)

"remote-handled'. Audit Report: IG-0613 More Documents & Publications EIS-0200-SA-03: Supplement Analysis EIS-0026-SA-06: Supplement Analysis EIS-0026-SA-08: Supplemental Analysis...

240

Audit Report: IG-0630 | Department of Energy  

Office of Environmental Management (EM)

policy, the goal of the Department's effort is to make biomass energy a cost-competitive alternative to traditional energy sources. Audit Report: IG-0630 More Documents &...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Audit Report: IG-0879 | Department of Energy  

Energy Savers (EERE)

IG-0879 Audit Report: IG-0879 December 21, 2012 Naval Reactors Information Technology System Development Efforts Our review identified continuing system development issues related...

242

Audit Peer Review 2012 | Department of Energy  

Energy Savers (EERE)

12 Audit Peer Review 2012 September 30, 2012 Subject: Department of Energy, Peer Review for the Fiscal Year Ending September 30, 2012 Reviewer: Treasury Inspector General for Tax...

243

Audit Peer Review 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Audit Peer Review 2009 September 30, 2009 Subject: Department of Energy, Peer Review for the Fiscal Year Ending September 30, 2009 Reviewer: Social Security Administration,...

244

Audit Report: IG-0550 | Department of Energy  

Energy Savers (EERE)

550 Audit Report: IG-0550 April 3, 2002 Disposition of the Department's Excess Facilities During the course of nuclear weapons production, the Department of Energy (Department) and...

245

Audit Report: IG-0511 | Department of Energy  

Energy Savers (EERE)

11 Audit Report: IG-0511 July 9, 2001 Research and Development at Lawrence Livermore National Laboratory Lawrence Livermore National Laboratory (Livermore), a major component of...

246

Audit/Investigation Records | Department of Energy  

Office of Environmental Management (EM)

Investigation Records AuditInvestigation Records This schedule covers records associated with investigations other than those performed by the Office of the Inspector General...

247

Audit Report: IG-0568 | Department of Energy  

Energy Savers (EERE)

68 Audit Report: IG-0568 September 13, 2002 Remote Access To Unclassified Information Systems Like most private sector and government organizations, the Department of Energy has an...

248

Audit Report: IG-0572 | Department of Energy  

Energy Savers (EERE)

572 Audit Report: IG-0572 November 4, 2002 Business Management Information System The Department of Energy began development of an integrated, agency-wide business information...

249

Audit Report: IG-0659 | Department of Energy  

Energy Savers (EERE)

659 Audit Report: IG-0659 August 16, 2004 The Stabilization of Nuclear Materials at Los Alamos National Laboratory In 1994, the Defense Nuclear Facilities Safety Board recommended...

250

Energy Audit of a Water System Network  

Science Journals Connector (OSTI)

The energy audit of water networks has to be focused... i - Operational schedule of pumping stations and available storage to atte...

Edmundo Koelle

1995-01-01T23:59:59.000Z

251

Audit Report: IG-0494 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Audit Report: IG-0494 February 13, 2001 The U.S. Department of Energy's Corporate Human Resource Information System The Department of Energy maintains integrated human resource...

252

Audit Report: IG-0541 | Department of Energy  

Office of Environmental Management (EM)

1 Audit Report: IG-0541 January 15, 2002 Remediation and Closure of the Ashtabula Environmental Management Project The RMI Titanium Company's Earthline Technology Division (RMI) is...

253

Audit Report: IG-0710 | Department of Energy  

Energy Savers (EERE)

10 Audit Report: IG-0710 November 17, 2005 Management of Facility Contractors Assigned to the Washington, D.C. Area Although specifically required by existing policy, program...

254

The Energy Audit Process & State Applications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Energy Audit Process & State Applications May 23 rd , 2013 DOE's State and Local Technical Assistance Program 2 DOE's Technical Assistance Program * Strategic Energy Planning *...

255

Audit Report: IG-0489 | Department of Energy  

Office of Environmental Management (EM)

9 Audit Report: IG-0489 November 28, 2000 AmericiumCurium Vitrification Project At The Savannah River Site In 1994, the Defense Nuclear Facilities Safety Board (DNFSB) recommended...

256

Audit Report: IG-0558 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Audit Report: IG-0558 June 7, 2002 Cost Sharing at the Ashtabula Environmental Management Project From 1952 through 1988, RMI Titanium Company (RMI), a private company, performed...

257

Audit Report: IG-0581 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 Audit Report: IG-0581 January 2, 2003 National Nuclear Security Administration's Nuclear Explosive Safety Study Program To ensure the protection of the public, employees,...

258

Audit Report: IG-0549 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

at the Idaho site. Audit Report: IG-0549 More Documents & Publications EIS-0287: Final Environmental Impact Statement EIS-0287: Idaho High-Level Waste and Facilities Disposition...

259

Audit Report: OAS-FS-11-06 | Department of Energy  

Energy Savers (EERE)

Report: OAS-FS-11-06 Audit Report: OAS-FS-11-06 April 7, 2011 Department of Energy Isotope Program's Fiscal Year 2007 The attached report presents the results of the...

260

Audit Report: OAS-RA-10-05 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

OAS-RA-10-05 Audit Report: OAS-RA-10-05 March 25, 2010 Management Controls over the Department's WinSAGA System for Energy Grants Management Under the Recovery Act As a result of...

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Oak Ridge National Laboratory - Audit and Oversight Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Internal Audit Directorate Administrative information for the Internal Audit Directorate is provided below. Contacts C. Gail Lewis, CIA, CISA, CFE, CPA (inactive) - IAD Director...

262

Ind.Audit Guide June 13_b.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Industrial Audit Guidebook A Guidebook for Performing Walk-through Energy Audits of Industrial Facilities Bonneville Power Administration 2 Table of Contents Section Page 1. How to...

263

Energy Audit and Retro-Commissioning Policies for Public and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings...

264

Energy Audit and Retro-Commissioning Policies for Public and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings U.S. Department...

265

Cyber Security Audit and Attack Detection Toolkit: Bandolier...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cyber Security Audit and Attack Detection Toolkit: Bandolier and Portaledge, March 2010 Cyber Security Audit and Attack Detection Toolkit: Bandolier and Portaledge, March 2010 This...

266

Audit Manual release 3.0  

SciTech Connect

This manual consolidates into one document the policies, procedures, standards, technical guidance and other techniques to be followed by the Assistant Inspector General for Audits and staff in planning and conducting audit work within DOE and in preparing related reports on behalf of the Office of Inspector General.

Not Available

1993-12-01T23:59:59.000Z

267

Why Audit? NY SD 7 Legislation Risk-limiting audits Ballot-level audits AUDITS: THE AFTER-MATH OF ELECTION  

E-Print Network (OSTI)

-MATH OF ELECTION REFORM Conference on Innovative Electoral Reforms and Strategies Philip B. Stark Department by hand. · Other reasons too: process improvement, deterrence, etc. · Compliance audits vs. materiality by hand. · Other reasons too: process improvement, deterrence, etc. · Compliance audits vs. materiality

Stark, Philip B.

268

Updating Texas Energy Cost Containment Audit Reports  

E-Print Network (OSTI)

moneys in a program known as LoanSTAR. Due to the time between the audits and availability of funds, update of the reports for current energy and equipment cost, and for accomplishment of projects was necessary. Audits in 1984 and 1986 identified total...

Burke, T. E.; Heffington, W. M.

1989-01-01T23:59:59.000Z

269

Pitfalls in Building and HVAC Audits  

E-Print Network (OSTI)

The purpose of an energy audit is to identify and analyze areas of energy consumption and to propose methods of conservation. In the process of completing an audit the following areas of consumption should be considered: 0 Building Envelope 0 Air...

Gidwani, B. N.

1985-01-01T23:59:59.000Z

270

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 26540 of 26,764 results. 31 - 26540 of 26,764 results. Download Audit Report: IG-0574 Calutron Isotope Production Capabilities http://energy.gov/ig/downloads/audit-report-ig-0574 Download Audit Report: IG-0571 Idaho Settlement Agreement Activities http://energy.gov/ig/downloads/audit-report-ig-0571 Download Internal Controls Over Sensitive Compartmented Information Access for Selected Field Intelligence Elements, IG-0796 http://energy.gov/ig/downloads/internal-controls-over-sensitive-compartmented-information-access-selected-field-0 Download Audit Report: ER-B-98-01 Audit of the Deactivation, Decontamination, and Disposal of Surplus Facilities at the Savannah River Site http://energy.gov/ig/downloads/audit-report-er-b-98-01 Download Audit Report: IG-0775 National Nuclear Security Administration's Construction of

271

Home Energy Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Weatherization » Home Energy Audits Weatherization » Home Energy Audits Home Energy Audits A home energy checkup helps owners determine where their house is losing energy and money - and how such problems can be corrected to make the home more energy efficient. A professional technician -- often called an energy auditor -- can give your home a checkup. Items shown here include checking for leaks, examining insulation, inspecting the furnace and ductwork, performing a blower door test and using an infrared camera. Learn more about a professional home energy audit. A home energy audit, also known as a home energy assessment, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you

272

Audit Report: IG-0425 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Audit Report: IG-0425 August 20, 1998 The U.S. Department of Energy's Facility Reuse at the Rocky Flats Environmental Technology Site For several decades, the Rocky Flats Environmental Technology Site (Site) operated as part of the Nation's nuclear weapons production complex. In 1989, however, the Department of Energy (DOE) ceased production at the Site and, by 1992, DOE began transitioning Rocky Flats to a cleanup mode. DOE's goal is to convert the Site to beneficial use in a manner that is safe, environmentally and socially responsible, physically secure, and economical. We initiated this audit to determine whether the Site was maximizing its reuse of excess facilities. Audit Report: IG-0425 More Documents & Publications Audit Report: WR-B-00-02 Audit Report: IG-0612

273

Professional Home Energy Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Professional Home Energy Audits Professional Home Energy Audits Professional Home Energy Audits November 26, 2013 - 4:59pm Addthis Learn about the steps and benefits of a comprehensive home energy assessment in this video. Read the text version. What does this mean for me? A professional energy audit gives you a thorough picture of where your home is losing energy and what you can do to save money. You can save 5%-30% on your energy bill by making upgrades following a home energy assessment. You may be eligible for state, local, or utility incentives to assist with your home energy audit. Visit the Database of State Incentives for Renewables and Efficiency to find out. How does it work? An energy auditor will walk through your home, review your bills, and conduct a blower door test or thermographic scan.Some utilities offer

274

Audit Report: IG-0426 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Audit Report: IG-0426 September 3, 1998 Disposal of Low-Level and Low-Level Mixed Waste The Department of Energy (Department) is faced with the legacy of thousands of contaminated areas and buildings and large volumes of "backlog" waste requiring disposal. Waste management and environmental restoration activities have become central to the Department's mission. One of the Department's priorities is to clean up former nuclear weapons sites and find more effective and timely methods for disposing of nuclear waste. This audit focused on determining if the Department was disposing of low-level and low-level mixed waste in the most cost-effective manner. Audit Report: IG-0426 More Documents & Publications Audit Report: IG-0527 Audit Letter Report: OAS-L-09-17

275

Audit Report: IG-0816 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: IG-0816 Audit Report: IG-0816 Audit Report: IG-0816 June 23, 2009 Fire Protection Deficiencies at Los Alamos National Laboratory The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. Topic: National Security and Safety Audit Report: IG-0816 More Documents & Publications Audit Report: IG-0837

276

Audits for For-Profit Firms FAQ  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Updated 12/31/2010) (Updated 12/31/2010) The U.S. Department of Energy ("DOE") is providing the following information to assist for-profit recipients of DOE awards in complying with the audit requirements of 10 CFR 600.316. Additional guidance, including the detailed compliance requirements and suggested audit procedures, will be forthcoming from DOE. 1. Q: Are for-profit entities that receive federal awards from DOE required to have compliance audits? Are sub- awardees required to have compliance audits? A: Yes. Under Regulation 10 CFR 600.316, a for-profit entity is required to have a compliance audit for any fiscal year it expends $500,000 or more in financial assistance awards 1 provided by any component of the U.S. Department of Energy. This requirement also applies to sub-awardees that receive DOE funds through a pass-

277

Audit Report: IG-0441 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Audit Report: IG-0441 March 16, 1999 Cost Sharing at Basic Energy Sciences' User Facilities The Department of Energy's Office of Basic Energy Sciences (BES) funds the construction and operation of 17 designated user facilities that are recognized as being critical to scientific research. BES provides the base-operating budget for its user facilities and generally makes the facilities available on a no-charge basis to all qualified researchers. The objective of the audit was to determine whether the Department could enhance scientific research at BES user facilities by seeking more opportunities for cost sharing. Audit Report: IG-0441 More Documents & Publications Audit Report: IG-0562 Audit Report: IG-0753 Semiannual Report to Congress: October 1, 1998 - March 31

278

Audit Report: IG-0486 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Audit Report: IG-0486 October 27, 2000 Federal Energy Regulatory Commission's Dam Safety Program Under the Federal Power Act, as amended, the Federal Energy Regulatory Commission (Commission) is responsible for ensuring that over 2,500 non-Federal hydroelectric dams under its jurisdiction are properly constructed, operated and maintained. To determine whether the dams' physical structures are maintained in a safe manner to protect the public, the Commission performs onsite inspections to identify evidence of damage or other conditions that could impair proper project operation or violate license requirements. Audit Report: IG-0486 More Documents & Publications Audit Report: IG-0750 Audit Report: IG-0744 Follow-up Audit on Stockpile Surveillance Testing, IG-0744

279

Audit Report: IG-0425 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25 25 Audit Report: IG-0425 August 20, 1998 The U.S. Department of Energy's Facility Reuse at the Rocky Flats Environmental Technology Site For several decades, the Rocky Flats Environmental Technology Site (Site) operated as part of the Nation's nuclear weapons production complex. In 1989, however, the Department of Energy (DOE) ceased production at the Site and, by 1992, DOE began transitioning Rocky Flats to a cleanup mode. DOE's goal is to convert the Site to beneficial use in a manner that is safe, environmentally and socially responsible, physically secure, and economical. We initiated this audit to determine whether the Site was maximizing its reuse of excess facilities. Audit Report: IG-0425 More Documents & Publications Audit Report: IG-0612 Audit Report: WR-B-00-02

280

Professional Home Energy Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Professional Home Energy Audits Professional Home Energy Audits Professional Home Energy Audits November 26, 2013 - 4:59pm Addthis Learn about the steps and benefits of a comprehensive home energy assessment in this video. Read the text version. What does this mean for me? A professional energy audit gives you a thorough picture of where your home is losing energy and what you can do to save money. You can save 5%-30% on your energy bill by making upgrades following a home energy assessment. You may be eligible for state, local, or utility incentives to assist with your home energy audit. Visit the Database of State Incentives for Renewables and Efficiency to find out. How does it work? An energy auditor will walk through your home, review your bills, and conduct a blower door test or thermographic scan.Some utilities offer

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Audit Report: IG-0565 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Audit Report: IG-0565 August 27, 2002 Salt Processing Project at the Savannah River Site As a result of Cold War weapons production, the Department of Energy accumulated millions of gallons of high-level waste that now require treatment and final disposal. At the Department's Savannah River Site, there are approximately 38 million gallons of high-level waste, including 35 million gallons of salt waste and 3 million gallons of sludge. To treat the salt waste, the Department originally planned to process the waste through the Savannah River Site's In-Tank Precipitation Facility so that cesium and other radionuclides could be removed. However, in February 1998, the Department suspended operation of the In-Tank Precipitation Facility because it could not be operated safely.

282

Audit Report: IG-0739 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

739 739 Audit Report: IG-0739 September 20, 2006 Performance-Based Contract Incentives at the Hanford Site In 2002. the Office of Environmental Management (EM) directed its field organization LO ensure thar the structure of environmental remediation contracts emphasized he completior~o f specific tasks. Many of these tasks were acknowledged to be a,,~ oressive and technologically challenging. As part of this initiative, EM'S field activities at the Hanford Washington site, the Richland Operations Office (Richland) and the Office of River Protection (ORP), incorporated results-oriented work scopes in the~cro ntracts and increased the potential fees that the contractors could earn for completing especially challenging work. Richland, for example, accelerated work on at least ten majrjor projects. It also increased the

283

Audit Report: IG-0739 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Audit Report: IG-0739 September 20, 2006 Performance-Based Contract Incentives at the Hanford Site In 2002. the Office of Environmental Management (EM) directed its field organization LO ensure thar the structure of environmental remediation contracts emphasized he completior~o f specific tasks. Many of these tasks were acknowledged to be a,,~ oressive and technologically challenging. As part of this initiative, EM'S field activities at the Hanford Washington site, the Richland Operations Office (Richland) and the Office of River Protection (ORP), incorporated results-oriented work scopes in the~cro ntracts and increased the potential fees that the contractors could earn for completing especially challenging work. Richland, for example, accelerated work on at least ten majrjor projects. It also increased the

284

Audit Report: IG-0450 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 Audit Report: IG-0450 July 26, 1999 The U.S. Department of Energy's Non-Nuclear Materials Inventory at the Kansas City Plant The Department of Energy (Department) maintains the majority of non-nuclear components of nuclear weapons at its Kansas City Plant. Allied Signal Federal Manufacturing and Technologies (Allied Signal) manages and operates the plant, while the Albuquerque Operations Office and its Kansas City Area Office are responsible for administering the contract with Allied Signal. In recent years, the United States has significantly reduced the number of weapons maintained in the stockpile. As a result, a large quantity of non-nuclear materials accumulated at the Kansas City Plant. The value of the inventory, as of October 1998, was $575 million. The objective of this

285

Audit Report: IG-0599 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Audit Report: IG-0599 May 22, 2003 Dual Axis Radiographic Hydrodynamic Test Facility The Dual Axis Radiographic Hydrodynamic Test (DARHT) facility is an experimental facility of the Stockpile Stewardship Program. The facility will provide high-speed, high-resolution flash radiographs to diagnose the results of hydrodynamic tests and dynamic experiments. Construction of DARHT began in 1988. Since that time, the project has undergone several baseline changes impacting different technical aspects of the project. Original plans called for the development of two single-pulse axes with similar capabilities at a cost of $30 million. In 1998, the scope was changed to expand the capability of the second axis while at the same time increasing the cost to $270 million. The following photograph shows DARHT's

286

Audit Report: IG-0834 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Audit Report: IG-0834 February 18, 2010 The Disposition of Uranium-233 at Oak Ridge National Laboratory As a result of the Department of Energy's nuclear weapons program legacy, its Oak Ridge National Laboratory (ORNL) stores about 1.4 metric tons of uranium containing 450 kilograms of uranium-233 (U-233). The material is currently stored in a deteriorating facility at ORNL that is over 60 years old. Because of its highly radioactive and dangerous properties, the U-233 is stored in a shielded storage location and must be handled in hot cells to protect workers from exposure. Since there were no programmatic uses for the material, the Department initiated efforts to dispose of it in 2001. In 2003, however, the conferees to the Fiscal Year 2003 Omnibus Appropriations

287

Audit Report: IG-0655 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Audit Report: IG-0655 July 22, 2004 Groundwater Remediation Activities at Hanford Fifty years of defense production has resulted in significant subsurface contamination at the Department of Energy's Hanford Site. An estimated 450 billion galls of liquid waste, some containing radionuclides and hazardous chemicals, have been released to the ground at Hanford since 1944. Much of the contamination remains above the groundwater in the vadose zone, the region between the land surface and underlying groundwater, but some has reached Hanford's groundwater. The Richarland Operations Office estimated that 80 square miles of Hanford's ground water had contaminated levels greated than Federal and State drinking water standards. Although groundwater at Hanford is not a primary source of drinking water, it does

288

Audit Report: IG-0690 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Audit Report: IG-0690 May 20, 2005 Contractor Post-Retirement Health Benefits at the Oak Ridge Reservation The Department of Energy (Department), including the National Requirements Nuclear Security Administration (NNSA), was inconsistent in its reimbursement for contractor post-retirement health benefit costs. Further, as a result of these inconsistencies, contractors were reimbursed for unreasonable costs. Specifically, while NNSA reimbursed BWXT Y-12, LLC (BWXT Y-12) for the post-retirement health benefits of corporate transferees, the Oak Ridge Operations Office (Operations Office) disallowed similar costs from the Bechtel Jacobs Company, LLC (Bechtel Jacobs) contract for the East Tennessee Technology Park and denied a request from UT-Battelle, LLC (UT-Battelle), to provide similar benefits for the

289

Audit Report: IG-0750 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-0750 IG-0750 Audit Report: IG-0750 December 18, 2006 The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams Pursuant to the Federal Power Act, the Federal Energy Regulatory Commission (FERC) regulates certain aspects of non-Federal hydroelectric dams. FERC is required to ensure the safety, stability. and integrity of these dams with the goal of protecting life, health, and property from, among other things, instances of sabotage and vandalism. To meet these requirements, FERC developed its Dam Safety and Security Programs to inspect and review safety and security efforts for about 2,600 dams. Of this number, over 900 are considered so significant or high hazard that if breached, loss of life and substantial economic and energy production disruption could result.

290

Audit Report: IG-0490 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Audit Report: IG-0490 November 28, 2000 Containers Suitable for Shipping Fissile Material As a result of its weapons program activities, the Department of Energy (Department) has a significant inventory of surplus fissile materials. Within the Department, the National Nuclear Security Administration and the Office of Environmental Management are responsible for managing this inventory, including its protection and disposal. To accomplish these objectives, the Department has established a program to ship the fissile materials, including surplus pits and plutonium metals, oxides, fluorides, and residues, from several Department facilities to a final designated disposition location. The various fissile materials are to be shipped in Type B containers certified by the Department or the Nuclear Regulatory

291

Audit Report: IG-0490 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90 90 Audit Report: IG-0490 November 28, 2000 Containers Suitable for Shipping Fissile Material As a result of its weapons program activities, the Department of Energy (Department) has a significant inventory of surplus fissile materials. Within the Department, the National Nuclear Security Administration and the Office of Environmental Management are responsible for managing this inventory, including its protection and disposal. To accomplish these objectives, the Department has established a program to ship the fissile materials, including surplus pits and plutonium metals, oxides, fluorides, and residues, from several Department facilities to a final designated disposition location. The various fissile materials are to be shipped in Type B containers certified by the Department or the Nuclear Regulatory

292

Audit Report: IG-0487 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Audit Report: IG-0487 October 31, 2000 The Restructure of Security Services by the Oak Ridge Operations Office In Fiscal Year (FY) 1998, the Oak Ridge Operations Office (Operations Office) decided to restructure its security services in an effort to reduce cost, gain more administrative control, and to capitalize on the efficiencies associated with a centralized approach to security. This new approach was thoroughly vetted with senior Department officials at Headquarters. To achieve its objectives, in FY 2000 the Operations Office awarded a 3-year base term contract for security services valued at $218 million to Wackenhut Services, Incorporated (Wackenhut). In its analysis justifying the new approach, the Operations Office estimated that cost savings of approximately $5 million a year would result from this new

293

Audit Report: IG-0510 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Audit Report: IG-0510 July 9, 2001 Use of Performance-Based Incentives at Selected Departmental Sites The Department of Energy (Department) began to incorporate performance-based incentive fees into its major management contracts after the 1994 Contract Reform report recommended the use of performancebased management contracts. The performance-based incentive approach ties elements of the contractor's profits to the achievement of specific technical performance objectives, delivery schedules, or cost control objectives. Thus, fees paid to contractors should bear a direct relationship to performance and require that each incentive have objective performance metrics and an objective evaluation of contractor performance. Successful use of performance-based incentives should also result in

294

Audit Report on "The Department's Management of Nuclear Materials Provided to Domestic Licensees"  

SciTech Connect

The objective if to determine whether the Department of Energy (Department) was adequately managing its nuclear materials provided to domestic licensees. The audit was performed from February 2007 to September 2008 at Department Headquarters in Washington, DC, and Germantown, MD; the Oak Ridge Office and the Oak Ridge National Laboratory in Oak Ridge, TN. In addition, we visited or obtained data from 40 different non-Departmental facilities in various states. To accomplish the audit objective, we: (1) Reviewed Departmental and Nuclear Regulatory Commission (NRC) requirements for the control and accountability of nuclear materials; (2) Analyzed a Nuclear Materials Management and Safeguards System (NMMSS) report with ending inventory balances for Department-owned nuclear materials dated September 30, 2007, to determine the amount and types of nuclear materials located at non-Department domestic facilities; (3) Held discussions with Department and NRC personnel that used NMMSS information to determine their roles and responsibilities related to the control and accountability over nuclear materials; (4) Selected a judgmental sample of 40 non-Department domestic facilities; (5) Met with licensee officials and sent confirmations to determine whether their actual inventories of Department-owned nuclear materials were consistent with inventories reported in the NMMSS; and, (6) Analyzed historical information related to the 2004 NMMSS inventory rebaselining initiative to determine the quantity of Department-owned nuclear materials that were written off from the domestic licensees inventory balances. This performance audit was conducted in accordance with generally accepted Government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objective. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives. The audit included tests of controls and compliance with laws and regulations related to managing the Department-owned nuclear materials provided to non-Departmental domestic licensees. Because our review was limited it would not necessarily have disclosed all internal control deficiencies that may have existed at the time of our audit. We examined the establishment of performance measures in accordance with Government Performance and Results Act of 1993, as they related to the audit objective. We found that the Department had established performance measures related to removing or disposing of nuclear materials and radiological sources around the world. We utilized computer generated data during our audit and performed procedures to validate the reliability of the information as necessary to satisfy our audit objective. As noted in the report, we questioned the reliability of the NMMSS data.

None

2009-02-01T23:59:59.000Z

295

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 26690 of 31,917 results. 81 - 26690 of 31,917 results. Download http://energy.gov/downloads/0 Download Lignol Innovations Inc http://energy.gov/downloads/lignol-innovations-inc Download Pacific Ethanol, Inc http://energy.gov/downloads/pacific-ethanol-inc-2 Download Applicant Organization: http://energy.gov/downloads/applicant-organization-2 Download Pacific Ethanol, Inc http://energy.gov/downloads/pacific-ethanol-inc-4 Download Interested_Parties_Boone_030809.pdf http://energy.gov/downloads/interestedpartiesboone030809pdf Download Audit Report: IG-0758 The National Nuclear Security Administration's Implementation of the Federal Information Security Management Act http://energy.gov/ig/downloads/audit-report-ig-0758 Download Audit Report: IG-0666 Audit Report on "The Los Alamos Neutron Science Center

296

Clinical audit: development of the criteria of good practices  

Science Journals Connector (OSTI)

......audit is a systematic review of the procedures in...quality audits. Among the regulatory efforts, the Council...audit is a systematic review of the procedures in...A sample of treatment plans would then be checked...audit is a systematic review of the procedures in......

S. Soimakallio; A. Alanen; H. Järvinen; A. Ahonen; K. Ceder; T. Lyyra-Laitinen; M. Paunio; T. Sinervo; T. Wigren

2011-09-01T23:59:59.000Z

297

Audit Report: AP-FS-97-02  

Energy.gov (U.S. Department of Energy (DOE))

Audit of Departmental Integrated Standardized Core Accounting System (DISCAS) Operations at Selected Field Sites

298

Audit Report: OAS-FS-13-08 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Audit Report: OAS-FS-13-08 December 17, 2012 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 KPMG, LLP noted certain matters involving internal control and other operational matters during their audit of the Department of Energy's (Department) Consolidated Financial Statements for Fiscal Year (FY) 2012. These matters are intended to improve the Department's internal controls or result in other operational efficiencies. The management letter contains 16 new findings and 7 repeat findings that were issued during the course of the FY 2012 Audit of the Department's Consolidated Financial Statements. Management generally concurred with and provided planned corrective actions for most of the recommendations

299

Audit Report: OAS-FS-12-03 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Audit Report: OAS-FS-12-03 November 2, 2011 The Department of Energy's Nuclear Waste Fund's Fiscal Year 2011 Financial Statements The attached report presents the results of the independent certified public accountants' audit of the Department of Energy's Nuclear Waste Fund's (Fund) Fiscal Year 2011 balance sheet and the related statements of net cost, changes in net position, and budgetary resources.To fulfill the Office of Inspector General's audit responsibilities, we contracted with the independent public accounting firm of KPMG LLP (KPMG) to conduct the audit, subject to our review. KPMG is responsible for expressing an opinion on the Fund's financial statements and reporting on applicable internal controls and compliance with laws and regulations. The Office of Inspector

300

Audit Report: OAS-FS-13-13 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

3-13 3-13 Audit Report: OAS-FS-13-13 August 12, 2013 Southwestern Federal Power System's Fiscal Year 2012 Financial Statement Audit We contracted with the independent public accounting firm of KPMG LLP (KPMG) to conduct the audit the Southwestern Federal Power System's (SWFPS) financial statements and reporting on applicable internal controls and compliance with laws and regulations. KPMG concluded that the combined financial statements present fairly, in all material respects, the respective financial position of the SWFPS as of September 30, 2012 and 2011, and the results of its operations and its cash flow for the years then ended, in conformity with U.S. generally accepted accounting principles. The audit identified an internal control deficiency over Accounting for

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Audit Report: OAS-M-12-05 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: OAS-M-12-05 Audit Report: OAS-M-12-05 Audit Report: OAS-M-12-05 June 29, 2012 Office of Secure Transportation Capabilities The National Nuclear Security Administration's (NNSA) Office of Secure Transportation (OST) is responsible for safely and securely transporting nuclear weapons, weapon components and special nuclear material for customers such as the Department of Energy, Department of Defense and the Nuclear Regulatory Commission. The demand for OST services is expected to increase significantly over the next 7 years as a result of current Presidential initiatives and international nonproliferation efforts. OST forecasts show an increase in mission demand through 2019. Due to the importance of OST's mission to safely and securely transport nuclear weapons, we performed this audit to evaluate the challenges OST faces in

302

Audit Report: OAS-FS-13-08 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OAS-FS-13-08 OAS-FS-13-08 Audit Report: OAS-FS-13-08 December 17, 2012 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 KPMG, LLP noted certain matters involving internal control and other operational matters during their audit of the Department of Energy's (Department) Consolidated Financial Statements for Fiscal Year (FY) 2012. These matters are intended to improve the Department's internal controls or result in other operational efficiencies. The management letter contains 16 new findings and 7 repeat findings that were issued during the course of the FY 2012 Audit of the Department's Consolidated Financial Statements. Management generally concurred with and provided planned corrective actions for most of the recommendations

303

Energy Audit Practices in China: National and Local Experiences and Issues  

E-Print Network (OSTI)

forthcoming. Industrial Energy Audit Guidebook: Guidelines2009. “China Enterprise Energy Audits: Current Status andOverview of Enterprise Energy Audits, August 21, 2006.

Shen, Bo

2011-01-01T23:59:59.000Z

304

Energy Audit Practices in China: National and Local Experiences and Issues  

E-Print Network (OSTI)

of Understanding about Energy Audit,” Energy Conservation2009. “China Enterprise Energy Audits: Current Status andReviewing Enterprise Energy Audit Report and Energy Saving

Shen, Bo

2013-01-01T23:59:59.000Z

305

Improving Energy Efficiency of Compressed Air System Based on System Audit  

E-Print Network (OSTI)

50 compressed air system energy audits completed by Shanghai50 compressed air system energy audits completed by Shanghaiof compressed air energy audits conducted by the Shanghai

Shanghai, Hongbo Qin; McKane, Aimee

2008-01-01T23:59:59.000Z

306

FRA, LLC Internal Audit Charter  

NLE Websites -- All DOE Office Websites (Extended Search)

I. In I. In A. M policies a office wh Laborator FRA Aud the Board performan Prime Co B. O FRA and Practice Auditors, 1 2 3 4 5 C. A the FRA access to their miss full and p concerns nternal Aud Mission. All and controls hich reports a ry, works in dit Committe d of Directo nce of the in ontract betwe Objectives. T d Laboratory of Internal , that: . Internal a protecting . Internal ac unallowab . Operation i.e., opera . Appropria . Internal co assure effi security. Authority. Th President an all FRA per sion to the ex private acces and findings dit Charter: Fermi Resea are subject t administrativ consultation ee. This prov ors, with an nternal contro een FRA and The objective managemen Auditing an accounting c g the assets of ccounting co ble costs.

307

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 2530 of 26,777 results. 21 - 2530 of 26,777 results. Download Audit Report: OAS-FS-12-04 Information Technology Management Letter on the Audit of the Department of Energy's Consolidated Balance Sheet for Fiscal Year 2011 (OUO Not Available for Viewing) http://energy.gov/ig/downloads/audit-report-oas-fs-12-04 Download Audit Report: OAS-FS-11-04 Information Technology Management Letter on the Audit of the Department of Energy's Consolidated Balance Sheet for Fiscal Year 2010 (OUO Not Available for Viewing) http://energy.gov/ig/downloads/audit-report-oas-fs-11-04 Download Audit Report: OAS-FS-14-04 Federal Energy Regulatory Commission's Fiscal Year 2013 Financial Statement Audit http://energy.gov/ig/downloads/audit-report-oas-fs-14-04 Download Mirant Reply to Comments re Special Environmental Analysis,

308

Comprehensive baseline environmental audit of former underground test areas in Colorado, Nevada, and New Mexico  

SciTech Connect

This report documents the results of the Comprehensive Baseline Environmental Audit of Former Underground Test Areas (FUTAS) in the States of Colorado, Nevada, and New Mexico. DOE and contractor systems for management of environmental protection activities on the Nevada Test Site (NTS) were not within the scope of the audit. The audit was conducted May 16-May 26, 1994, by the Office of Environmental Audit (EH-24). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program{close_quotes}, establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is to enhance environmental protection and minimize risk to public health and the environment. EH-24 accomplishes its mission using systematic and periodic evaluations of DOE`s environmental programs within line organizations and supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. These evaluations function as a vehicle through which the Secretary and program managers are apprised of the status and vulnerabilities of Departmental environmental activities and environmental management systems. Several types of evaluations are conducted, including: (1) comprehensive baseline environmental audits; (2) routine environmental audits; (3) environmental management assessments; and (4) special issue reviews.

Not Available

1994-05-01T23:59:59.000Z

309

U.S. Department of Energy Office of Audit Services  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Challenges at the Management Challenges at the Department of Energy DOE/IG-0580 December 2002 Audit Report Federal Energy Regulatory Commission's Performance Management DOE/IG-0627 November 2003 Department of Energy Washington, DC 20585 November 24, 2003 MEMORANDUM FOR THE CHAI COMMISSION FROM: Gregory H. Friedman N, FEDERAL ENERGY REGULATORY Inspector General SUBJECT: INFORMATION: Audit Report on "Federal Energy Regulatory Commission's Performance Management" BACKGROUND The Federal Energy Regulatory Commission, as an independent, five-member body, regulates certain aspects of the oil, natural gas, and electricity industries, and licenses hydroelectric projects. As required by the Government Performance and Results Act of 1993, the Commission developed performance goals in four major areas to help guide

310

Audit Report: IG-0528 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Audit Report: IG-0528 October 5, 2001 Stockpile Surveillance Testing In 1993, the President and Congress reaffirmed the moratorium on underground nuclear testing and directed that a science-based Stockpile Stewardship Program be developed to maintain the nation's stockpile of nuclear weapons. The Department of Energy's (Department) plan for the Stockpile Stewardship Program describes it as one of the most complex, scientific-technical programs ever undertaken. The program consists of surveillance, experimentation, computation, and production. Its focus is to maintain "high confidence" in the safety and reliability of the stockpile without nuclear testing. Audit Report: IG-0528 More Documents & Publications Audit Report: IG-0744 Follow-up Audit on Stockpile Surveillance Testing, IG-0744

311

Home Energy Audits | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency » Homes » Home Weatherization » Home Energy Energy Efficiency » Homes » Home Weatherization » Home Energy Audits Home Energy Audits November 26, 2013 Professional Home Energy Audits A home energy audit is the first step to assessing how much energy your home consumes and to deciding what measures you can take to make your home more energy efficient. October 28, 2013 William Stewart, with Veterans Green Jobs, blows cellulose insulation in the interior walls of a Lakewood, Colorado, home. This home is part of the Energy Department's Weatherization Assistance Program that supports energy efficiency upgrades to low-income homes in Denver. | Photo courtesy of Dennis Schroeder, NREL. Weatherization Saves Families Energy and Money In honor of National Weatherization Day, we're highlighting how energy

312

Audit Report: IG-0623 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: IG-0623 Audit Report: IG-0623 Audit Report: IG-0623 October 14, 2003 Reindustrialization of the East Tennessee Technology Park The Community Reuse Organization of East Tennessee (CROET), with Bechtel Jacobs Company, LLC, (Bechtel Jacobs) assistance, has acted as a leasing agent to attract private companies interested in leasing buildings, space, and equipment at the East Tennessee Technology Park (ETTP). The Department of Energy (Department) leased facilities and equipment to CROET at no cost, and CROET sublet these facilities to commercial companies. CROET attracted tenants with innovative leasing arrangements such as favorable lease terms for buildings where commercial entities assumed some or all of the responsibility for cleanup activities. Audit Report: IG-0623

313

Audit Report: IG-0878 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: IG-0878 Audit Report: IG-0878 Audit Report: IG-0878 December 11, 2012 Follow-up Audit of the Department's Cyber Security Incident Management Program The Federal Information Security Management Act of 2002 requires each agency to implement procedures for detecting, reporting and responding to cyber security incidents, including notifying and consulting with the Federal information security incident center, law enforcement agencies and Inspectors General. To meet this requirement and counter the threat posed by cyber attacks, the Department's Office of the Chief Information Officer, the National Nuclear Security Administration (NNSA) and a number of field sites established organizations to provide expertise in preventing, detecting, responding to and recovering from cyber security incidents. In

314

Audit Report: IG-0554 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Audit Report: IG-0554 May 13, 2002 The Plutonium Stabilization and Packaging System at the Rocky Flats Environmental Technology Site From 1952 to 1989, the Rocky Flats Environmental Technology Site (Rocky Flats) produced nuclear weapons components for the Department of Energy. In January 1992, the primary mission of the site changed from nuclear weapons production to site cleanup and closure. A prerequisite to closure is the removal of 9,800 kilograms of plutonium metals and oxides stored at the site. Rocky Flats estimates that these metals and oxides will be packaged into 1,900 containers which, as currently planned, will be shipped to the Department's Savannah River Site. Audit Report: IG-0554 More Documents & Publications Audit Report: IG-0659 Audit Report: IG-0411

315

Audit Report: IG-0508 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Audit Report: IG-0508 July 27, 2001 Audit Report, Stocked Inventory at the Savannah River Site The Department of Energy's (Department) management and operating contractor at the Savannah River Site, Westinghouse Savannah River Company (Westinghouse), is responsible for managing the majority of the Department's missions and associated stocked inventory at the site. As of March 2001, Westinghouse maintained about 4.1 million items in its stocked inventory. These items have an acquisition value of about $64 million. Westinghouse estimated the cost directly related to storing these items to be about $700,000 annually. The objective of this audit was to evaluate Westinghouse's management of the stocked inventory at the Savannah River Site. Audit Report: IG-0508

316

Audit Report: IG-0528 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 Audit Report: IG-0528 October 5, 2001 Stockpile Surveillance Testing In 1993, the President and Congress reaffirmed the moratorium on underground nuclear testing and directed that a science-based Stockpile Stewardship Program be developed to maintain the nation's stockpile of nuclear weapons. The Department of Energy's (Department) plan for the Stockpile Stewardship Program describes it as one of the most complex, scientific-technical programs ever undertaken. The program consists of surveillance, experimentation, computation, and production. Its focus is to maintain "high confidence" in the safety and reliability of the stockpile without nuclear testing. Audit Report: IG-0528 More Documents & Publications Audit Report: IG-0744 Follow-up Audit on Stockpile Surveillance Testing, IG-0744

317

Audit Report: IG-0622 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

622 622 Audit Report: IG-0622 September 30, 2003 The Advanced Mixed Waste Treatment Facility Contract at the Idaho National Engineering and Environmental Laboratory In 1996, the Department of Energy awarded a $912 million fixed-price contract to BNFL, Inc. for services associated with a planned Advanced Mixed Waste Treatment Facility (AMWTF) at the Idaho National Engineering and Environmental Laboratory (INEEL). The bulk of this amount, $569 million, was for construction of the AMWTF and its processing equipment. Although construction of AMWTF was completed in December 2002, as of June 2003 the facility was not yet fully operational. Audit Report: IG-0622 More Documents & Publications Audit Report: IG-0611 Audit Report: IG-0649 Semiannual Report to Congress: April 1 to September 30, 2003

318

Audit Report: IG-0688 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Audit Report: IG-0688 May 3, 2005 National Nuclear Security Administration's Pit Disassembly and Conversion Facility In order to dispose of surplus plutonium, the National Nuclear Security Administration (NNSA) planned to construct two facilities at the Savannah River Site. The first facility, the Pit Disassembly and Conversion Facility (Conversion Facility), is designed to convert surplus nuclear weapon pits and plutonium metal into an oxide. The second facility, the Mixed Oxide Fuel Fabrication Facility (MOX Facility) will convert the plutonium oxide produced by the Conversion Facility into fuel for use in commercial nuclear power plants. Audit Report: IG-0688 More Documents & Publications Audit Report: IG-0713 EIS-0283-SA-02: Supplement Analysis Audit Report: IG-0618

319

Audit Report: IG-0816 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Audit Report: IG-0816 June 23, 2009 Fire Protection Deficiencies at Los Alamos National Laboratory The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. Topic: National Security and Safety Audit Report: IG-0816 More Documents & Publications Audit Report: IG-0837 Audit Report: OAS-M-13-04

320

Audit Report: IG-0502 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Audit Report: IG-0502 May 7, 2001 Sale of Land at Oak Ridge Under the Atomic Energy Act of 1954, the U.S. Department of Energy (Department) may sell land in the performance of identified programmatic functions. The functions specified in the Atomic Energy Act include encouraging scientific and industrial progress, controlling special nuclear material, encouraging utilization of atomic energy for peaceful purposes, promoting the common defense, and the administration of programs that implement these functions. The objective of this audit was to determine if the sale of land was an appropriate use of the special authorities granted under the Atomic Energy Act. Audit Report: IG-0502 More Documents & Publications Audit Report: IG-0399 EA-1113: Final Environmental Assessment (Addendum)

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Summary of Audit Report: IG-0772  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report U.S. Department of Energy Office of Inspector General Office of Audit Services The National Nuclear Security Administration's Management of Classified Weapons Parts DOE/IG-0772 July 2007 This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act This is ( I .sr~mmclry qf A ut fit Report IG-0 772, entitled "The Natiotoncl I Nucleclr Seczdritj' Administr~rtion's Munrcgement of Clnssrfieci Weapons Purls. " The complete report is not crvc~il~rhle for p~dhlic disclosu~e. BACKGROUND The Department of Energy's National Nuclear Security Administration (NNSA) maintains the safety, security, reliability and perfomiance of the United States nuclear

322

Audit Report: IG-0430 | Department of Energy  

Energy Savers (EERE)

0 Audit Report: IG-0430 November 5, 1998 The U.S. Department of Energy's Project Hanford Management Contract Costs and Performance To offset the negative impact of downsizing its...

323

Audit Report: IG-0514 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and jurisdiction over the land within the Monument, the Department of Interior's U.S. Fish and Wildlife Service manages about 84 percent of the land. The objective of the audit...

324

Audit Report: IG-0434 | Department of Energy  

Energy Savers (EERE)

4 Audit Report: IG-0434 December 18, 1998 Waste Inventory Data at Oak Ridge and Savannah River The Oak Ridge and Savannah River Operations Offices are responsible for maintaining...

325

Audit Report: IG-0727 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

7 Audit Report: IG-0727 May 12, 2006 Management of Spent Nuclear Fuel at the Savannah River Site The Department of Energy's (Department) spent nuclear fuel Operations program at...

326

Audit Report: IG-0467 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

7 Audit Report: IG-0467 April 6, 2000 The U.S. Department of Energy's Global Climate Change Activities The President's Climate Change Proposal of October 1997 and the United...

327

Audit Report: IG-0781 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Audit Report: IG-0781 November 6, 2007 Continuity of Operations at Bonneville Power Administration In the event of a major disruption to its nonnal operations, Bonneville must be...

328

Audit Report: IG-0664 | Department of Energy  

Office of Environmental Management (EM)

664 Audit Report: IG-0664 September 27, 2004 Property Disposals at the Yucca Mountain Project Yucca Mountain is located on the western edge of the Navada Test Site, approximately...

329

Model Investment Grade Audit and Project Proposal  

Energy.gov (U.S. Department of Energy (DOE))

Information and documents for conducting an investment grade audit to evaluate potential measures and presenting a project proposal for a set of bundled measures that deliver savings to pay for the project over the finance term.

330

Audit Report: IG-0420 | Department of Energy  

Office of Environmental Management (EM)

The purpose of the audit was to determine if the Department had fully examined the costs and benefits of siting a solar facility at the Nevada Test Site and at alternative...

331

Audit Report: IG-0505 | Department of Energy  

Energy Savers (EERE)

05 Audit Report: IG-0505 May 25, 2001 Utilization of the Department's Low-Level Waste Disposal Facilities Since the creation of the Department of Energy's nuclear weapons complex,...

332

Audit Report: IG-0553 | Department of Energy  

Office of Environmental Management (EM)

553 Audit Report: IG-0553 May 2, 2002 Alternative Fuels Use at the Department of Energy Since the 1970s, various strategies have been pursued to address concerns relating to U.S....

333

Audit Report: IG-0427 | Department of Energy  

Office of Environmental Management (EM)

7 Audit Report: IG-0427 September 11, 1998 The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs In Fiscal Year 1996, the Department's prime contractors...

334

Audit Report: IG-0560 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Audit Report: IG-0560 June 24, 2002 The Department of Energy's Tritium Extraction Facility On March 19, 2002, you asked the Office of Inspector General to conduct an expedited...

335

Audit Report: IG-0436 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Audit Report: IG-0436 January 19, 1999 The U.S. Department of Energy's Procurement and Assistance Data System The Procurement and Assistance Data System (PADS) is the...

336

Audit Report: IG-0546 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Audit Report: IG-0546 March 20, 2002 Accounting for Sealed Sources of Nuclear Material Provided to Foreign Countries Through the Atomic Energy Act of 1954, the Department of...

337

Towards robot audition Leslie S. Smith  

E-Print Network (OSTI)

Towards robot audition Leslie S. Smith Department of Computing Science and Mathematics, University in illumination, and auditory systems can detect changes in room reverberation. #12;2 Leslie S. Smith Another key

Smith, Leslie S.

338

Improvements and assessments of water auditing techniques  

E-Print Network (OSTI)

of unavoidable annual real losses (allowable leakage) for a system with varied pressure zones, and defining procedures for assessing customer meter accuracy for a system. Application of the improved IWA audit method to SAWS discovered that its system input volume...

Meyer, Sarah Ruth

2009-05-15T23:59:59.000Z

339

Energy Audits on Prince Edward Island  

E-Print Network (OSTI)

High energy costs and uncertain supplies force industrial operators to seek out energy waste to keep costs down. The Enersave for Industry and Commerce program assists Prince Edward Island industries through an energy audit and grant program. A...

Hall, N. G.; Gillis, D.

1980-01-01T23:59:59.000Z

340

Audit Report: IG-0647 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report: IG-0647 Audit Report: IG-0647 Audit Report: IG-0647 April 22, 2004 System Development Activities at Selected Management Contractors The Department of Energy relies extensively on information technology to manage its programs and functions. Systems and applications support virtually every aspect of the Department's diverse mission, covering activities ranging from business and financial processes to assuring the reliability of the Nation's nuclear stockpile. To place the magnitude of this effort in context, in Fiscal Year 2002, the Department expended $2.3 billion on information technology, or about 11 percent of its overall budget. Of this amount, $1.1 billion was specifically dedicated to resource development, modernization and enhancement. Audit Report: IG-0647

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

National Energy Audit (NEAT) | Open Energy Information  

Open Energy Info (EERE)

National Energy Audit (NEAT) National Energy Audit (NEAT) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: National Energy Audit Agency/Company /Organization: United States Department of Energy Partner: Oak Ridge National Laboratory Sector: Energy Focus Area: Buildings, Energy Efficiency Resource Type: Software/modeling tools User Interface: Desktop Application Website: apps1.eere.energy.gov/buildings/tools_directory/software.cfm/ID=304/pa Cost: Free Language: English References: http://apps1.eere.energy.gov/buildings/tools_directory/software.cfm/ID=304/pagename=alpha_list Logo: National Energy Audit The computer program is designed for use by State agencies and utilities to determine the most cost-effective retrofit measures for single-family and small multi-family site-built homes to increase the energy efficiency and

342

Election Auditing and Nonparametric Confidence Bounds  

E-Print Network (OSTI)

ballot measure in Marin County, CA, a November 2008 bond measure in Yolo County California, with audits · Random selection · Hypothesis testing framework: the math · The realities · Examples: 2008 Yolo Measure W

Stark, Philip B.

343

Review of Selected Home Energy Auditing Tools  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVIEW OF SELECTED HOME REVIEW OF SELECTED HOME ENERGY AUDITING TOOLS In Support of the Development of a National Building Performance Assessment and Rating Program Prepared for: The U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy Prepared by: SENTECH, Inc. (now part of SRA International, Inc.) November 2, 2010 TABLE OF CONTENTS TABLE OF CONTENTS ....................................................................................................... 2 1. EXECUTIVE SUMMARY .......................................................................................... 3 2. INTRODUCTION ............................................................................................................. 4 3. ENERGY AUDIT TOOL TYPES ................................................................................. 5

344

Cyber Security Audit and Attack Detection Toolkit  

SciTech Connect

This goal of this project was to develop cyber security audit and attack detection tools for industrial control systems (ICS). Digital Bond developed and released a tool named Bandolier that audits ICS components commonly used in the energy sector against an optimal security configuration. The Portaledge Project developed a capability for the PI Historian, the most widely used Historian in the energy sector, to aggregate security events and detect cyber attacks.

Peterson, Dale

2012-05-31T23:59:59.000Z

345

Download  

Science Journals Connector (OSTI)

S. Guarda prepared the media and maintained the cultures. .... the filtration tower, that excess media with traces of ...... L. Smith and M. H. Chanley [eds.], Culture ...

2000-03-19T23:59:59.000Z

346

Download  

Science Journals Connector (OSTI)

lowed by darkness (units given in list of symbols). ... the hypothesis lay in the discovery that the ..... scription based upon efficiency of energy conver- sion. J. Mar.

2000-03-10T23:59:59.000Z

347

Download  

Science Journals Connector (OSTI)

ways of matter and energy transfer (Fuhrman 1999; Wom- ..... for 2 h in the dark with Acridine Orange (0.025% final con- ..... Discovery Passage, Canada.

2004-02-26T23:59:59.000Z

348

Download  

Science Journals Connector (OSTI)

Jul 27, 1981 ... dark respiration is constant and that pho- torespiration represents an irrelevant loss of potential biomass or energy before it ... The discovery.

2000-02-08T23:59:59.000Z

349

Download  

Science Journals Connector (OSTI)

energy on this northern boundary of the. Southern Ocean still .... of the: data depend on the light- and dark- bottle 02 method ... Discovery Rept.,. 27 : 201-218.

2000-02-10T23:59:59.000Z

350

Download  

Science Journals Connector (OSTI)

1977) led to the discovery of the ubiq- uitous occurrence ... samples were stored in a dark, cool location. Fig. 1. ...... in nutrients though they lose in light energy.

2000-02-16T23:59:59.000Z

351

Download  

Science Journals Connector (OSTI)

energy accumulation and the utilization of these reserves for overwintering and ..... compensate for the lack of phytoplankton during the dark season to provide sufficient ..... Discovery. Rep. 14: 193-324. KATES, K., AND B. E. VOLCANI. 1966.

352

Download  

Science Journals Connector (OSTI)

Estuarine Research Center, Academy of Natural Sciences, 10545 Mackall Rd., ... rank or develop a hierarchy of factors contributing to settle- ment patterns (but see Wethey 1986). Lastly, larval settle- ment cues often co-vary (e.g. gas solubility with tempera- .... substrate, (E) gear-drive and faceplate attachment plate, (F) low.

2000-10-17T23:59:59.000Z

353

Download  

Science Journals Connector (OSTI)

creased understanding of the physics that drives the circulation and ... cesses on dissolved gas and nutrient dynamics also require the .... natural environments due to interference from .... the pre-exponential factor (=6.327 x 10Y8 m*. s-l) and

1999-12-22T23:59:59.000Z

354

Download  

Science Journals Connector (OSTI)

New production and production of large phytoplankton (>5. Frn) on the ... J. Plankton Res. ... trient concentrations from temperature and sigma-t in the upper.

355

Download  

Science Journals Connector (OSTI)

contrast, DOC production by phytoplankton was low, ranging from 3 to 7% of algal ..... bottles were then calculated from. A* = 4*{ewW - s>(t, - tJ - 1). (t2. - t,)(k - g>.

356

Download  

Science Journals Connector (OSTI)

ally under a low-power ( 15~ ) dissecting microscope. ...... paratively shallow water from a foot to six feet in ... (25 feet) but these stations included the areas of

357

Download  

Science Journals Connector (OSTI)

duce extreme types of aquatic environments that are well .... The residue was fused at 1,lOO”C and ... Si,) was dissolved in acid after fusion with LiBO,, and Si,.

358

Download  

Science Journals Connector (OSTI)

Jul 18, 1975 ... distinct bacterial types followed Michaelis-Mentcn ... Comparison of several different ccl1 types indi- ..... take by dil'fusion (Wright and Hobbie.

2000-01-05T23:59:59.000Z

359

Download  

Science Journals Connector (OSTI)

type and phenotype increases with the num- ... types at 16 different loci among 22 popu- lations of D. galeata ..... fusion with D. galeata mendotae. However,.

2000-03-18T23:59:59.000Z

360

Download  

Science Journals Connector (OSTI)

and J. Cook is greatly appreciated. Materials and naethods. AIthough mats in .... the agar would drive off most of the oxygen and the facultatively aerobic bacteria

2000-01-04T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Download  

Science Journals Connector (OSTI)

from numerous macromolecules in addition to peptidoglycan and are not solely from peptidoglycan. .... HCl and neutralized with a self-absorbed ion retardation resin (Kaiser and Benner 2000). ...... demonstrating that most DOM has been chemically altered ..... performance anion exchange chromatography and pulsed.

2007-12-18T23:59:59.000Z

362

Download  

Science Journals Connector (OSTI)

Jan 13, 1977 ... addition of 1.0 ml of pH 9.0 buffer with- ... resin (Bio-Rad) were prepared .... on AG l-X8 ion exchange was 96-102%, .... 4A), demonstrating the.

2000-01-08T23:59:59.000Z

363

Download  

Science Journals Connector (OSTI)

tutes of Health WP Grant 00936. \\Ve have .... cm) or a lot, depending on the care used. The overlying water ... chainfalls and considerable care in han- dling with ...

2000-02-10T23:59:59.000Z

364

Download  

Science Journals Connector (OSTI)

Jan 29, 1975 ... more long term intermittency of wind stress. ( Bakun and ... However, this idealized analysis of just .... sponds to interaction of life cycles of the.

2000-01-04T23:59:59.000Z

365

Download  

Science Journals Connector (OSTI)

A few prevalent symbiont types, or generalists, dominate the coral community of the southern GBR, whereas many .... most critical for locating a certain symbiont type (at the res- .... were performed on aligned data sets using PAUP 4.0b8 soft-.

2003-08-25T23:59:59.000Z

366

Download  

Science Journals Connector (OSTI)

The transfer process was performed in a clean room using clean hands-dirty hands techniques. This procedure is similar to that used by Back and Watras (

2000-10-21T23:59:59.000Z

367

Download  

Science Journals Connector (OSTI)

Records 92 - 835 ... indicate that at some stage ,of the lift history ... Mouthparts, gnathopods and first four .... Museum; also a large collection from Point Bar-.

2000-02-13T23:59:59.000Z

368

Download  

Science Journals Connector (OSTI)

Four fiber glass tanks (inside dimensions. 85 X 85 cm, ... closest to that of the seawater at the point of capture. ... bath at each of the four temperatures already mentioned ..... to its lift cycle. Rapp. Proces-Vcrbaux. Reunions, Conscil Perm. Intern.

369

Download  

Science Journals Connector (OSTI)

Oct 1, 1973 ... raminifera depends on four main factors: standing crop ... puu Point on the southeast coast of Oahu, ..... The details of the lift cycle of Amphiste-.

2000-01-03T23:59:59.000Z

370

Download  

Science Journals Connector (OSTI)

Oct 20, 1972 ... Power spectra present the changes in energy density occurring with the passage of a squall line, a fast-moving cold front, and steady winds.

1999-12-27T23:59:59.000Z

371

Download  

Science Journals Connector (OSTI)

Water Chemistry Laboratory,. University of Wisconsin, Madison. 53706. ABSTBACIY ... The importance of testing each species of plants separately is shown.

Orcas

2000-02-11T23:59:59.000Z

372

Download  

Science Journals Connector (OSTI)

Oct 18, 1977 ... Department of Botany, University of Wisconsin, Madison 53706 ... plants with laminar leaves, can be a sig- .... 2.96 IL 0.32. 790 ..... chemistry.

2000-01-08T23:59:59.000Z

373

Download  

Science Journals Connector (OSTI)

of Pelamb in the tropical Indian and Pacific Oceans is correlated with surface water temperatures ..... This front is a point of marked transition from greenish ...

2000-02-15T23:59:59.000Z

374

Download  

Science Journals Connector (OSTI)

Feb 6, 1991 ... point source of nutrients associated with a bird colony in eastern Florida ... Local variation around the nutrient point ..... 115 Indian Mound Trail.

2000-03-18T23:59:59.000Z

375

Download  

Science Journals Connector (OSTI)

in the Indian Ocean. J. Oceanogr. Sot. Japan 19: ... Point values from each depth were inte- grated to obtain ... the “fit” of the regression to the data points was r2.

2000-02-13T23:59:59.000Z

376

Download  

Science Journals Connector (OSTI)

University of Maryland Center for Environmental Science, Horn Point Laboratory, Cambridge, Maryland 21613 ...... Transfer of phosphorus from the Indian.

2007-12-18T23:59:59.000Z

377

Download  

Science Journals Connector (OSTI)

Pacific, and Indian Oceans. The more re- cent deep-water .... returned to Point Barrow. Nutrients were ... freezing point, is relatively dilute and well mixed down to ...

2000-02-13T23:59:59.000Z

378

Download  

Science Journals Connector (OSTI)

of living processes, it is a debatable point whether, for a given effort, .... like the Southern Indian Lake example (Na- ... Southern Indian Lake in proportion to al-.

2000-02-24T23:59:59.000Z

379

Download  

Science Journals Connector (OSTI)

Mar 18, 1975 ... Ahmcclabad 380 009 India. M. Koide and E. D. ... the Pacific, Atlantic, Indian, Arctic, and. Antarctic ..... other point inferred from Fig. 3a and b is ...

2000-01-04T23:59:59.000Z

380

Download  

Science Journals Connector (OSTI)

University of Leeds. Wellcome Marine Laboratory. Robin Hood's .... on nutrient control policies in Canada has some rather damning mass balance calculations.

1999-12-27T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Download  

Science Journals Connector (OSTI)

Jul 16, 1973 ... traction requires a sequence of solvents and, for a large number of samples, ... unlabeled red, brown, and green marine algae and eel grass for ...

382

Download  

Science Journals Connector (OSTI)

FROM DEAD GREEN ALGAL CELLS. II. ... microbial decomposition of dead green algal cells under .... the first solvent and n-butanol:acetic acid: water (4: 1: 1

1999-12-25T23:59:59.000Z

383

Download  

Science Journals Connector (OSTI)

by marine blue-green algae ( Stewart 1963) has recently been .... with acid solvents, it was necessary to ... five solvent systems, it was recorded as mannitol.

384

Download  

Science Journals Connector (OSTI)

Nov 3, 1975 ... rophyll from diatoms and blue-green algae, ... green algae tested giving 2-60 times more ... ever, none of these solvents remove the un-.

2000-01-05T23:59:59.000Z

385

Download  

Science Journals Connector (OSTI)

Jan 7, 1975 ... phorbins in organic solvents are well known. (Strain and .... green olive olive brown brown green blue- green brown. 17. 429. 16. 416. 19. 408.

2000-01-05T23:59:59.000Z

386

Download  

Science Journals Connector (OSTI)

solvent. This entire procedure is similar to an extraction process used by the ... None of the solvents used appre- ... band blue, green, and red filters was used.

387

Download  

Science Journals Connector (OSTI)

ABSTRACT. The green alga, Scenedesnzus sp., killed by freeze-drying, ... nitrogen from dead green algal cells under ..... sour after removal of solvent on a water.

1999-12-25T23:59:59.000Z

388

Download  

E-Print Network (OSTI)

Wachter for taking a lot of organizational stuff from my shoulders, our chair Winfried ...... To further improve efficiency, we only dualize those constraints in every ...

2012-06-11T23:59:59.000Z

389

Download  

Science Journals Connector (OSTI)

tric motor drives the platform at a speed of about 50 rpm, ... circular tank rests on the platform and holds the liquid ... the summertime, studies chemical and bo-.

2000-02-12T23:59:59.000Z

390

Download  

Science Journals Connector (OSTI)

Dec 28, 1983 ... A Transidyne General chemical microsensor .... trode that is insensitive to medium chemical com- ... the lack of a suitable platform for making.

2000-02-19T23:59:59.000Z

391

Download  

Science Journals Connector (OSTI)

Jun 10, 1974 ... the sensor cable. The observation platform ... ated with platform drift. The necessity to .... with many physical and chemical properties. (Mortland ...

2000-01-03T23:59:59.000Z

392

Download  

Science Journals Connector (OSTI)

Apr 25, 1975 ... chemical analyses of sediments (e.g. Hutch- inson and ... chemical and biological composition of .... platform of Cenozoic marinc limestone.

2000-01-04T23:59:59.000Z

393

Download  

Science Journals Connector (OSTI)

and his colleagues with the purified system from. Chlorella. ... and purification of enzymes from ... air--water interfaces, of various transfer processes, momentum ...

2000-01-11T23:59:59.000Z

394

Download  

Science Journals Connector (OSTI)

Mar 22, 1974 ... 139. WhTER FLOW. AMBIENT LIGE!T. SILICON PHOTOVOLTAIC. 0.430m PATH. CELL. LENGTH. LIGHT SOURCE. RECEIVER. PROJRCTOR.

2000-01-03T23:59:59.000Z

395

Download  

Science Journals Connector (OSTI)

surface water were generally high in winter and low in summer, primarily in response to the seasonality of biological ... The range of residence times for the total radionuclide inventories estimated from an .... uranium isotopes were then adsorbed onto cellulose Hy- ..... to an enrichment in the epilimnion and a depletion in.

396

Download  

Science Journals Connector (OSTI)

High rates of photosynthesis were well maintained over the main period of each exposure, despite the development of oxygen supersaturation. Lower rates ...

397

Download  

Science Journals Connector (OSTI)

The photosynthetic action spectrum was determined by measurement of the initial slope of the photosynthesis-irradiance curve every 25 nm from 400 to 675 nm ...

2000-02-28T23:59:59.000Z

398

Download  

Science Journals Connector (OSTI)

NOTES AND COMMENT. OBSERVATIONS ON THE VARIATION OF PLANKTONIC. PHOTOSYNTHESIS. WITH. LIGHT INTENSITY, USING BOTH THE O2 AND ...

1999-12-19T23:59:59.000Z

399

Download  

Science Journals Connector (OSTI)

Jun 4, 1996 ... Regulation and role of photosynthesis in the colonial symbiotic ciliate ... Symbiotic photosynthesis of the colonial ciliate Ophrydium versatile ...

400

Download  

Science Journals Connector (OSTI)

Aug 15, 1985 ... Photoadaptations of photosynthesis and carbon metabolism by ... For algae collected beneath the sea ice, photosynthesis generally saturated ...

2000-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Download  

Science Journals Connector (OSTI)

LIGHT ATTENUATORS FOR USE IN PHYTOPLANKTON PHOTOSYNTHESIS STUDIES. A study of the response of phytoplankton to variations of light intensity

1999-12-19T23:59:59.000Z

402

Download  

Science Journals Connector (OSTI)

Photosynthesis and light utilization in the Caribbean coral Montastraea faveolata recovering from a bleaching event. Aimé Rodr?guez-Román.

2006-10-04T23:59:59.000Z

403

Download  

Science Journals Connector (OSTI)

Mar 4, 1982 ... Notes. Photosynthesis of benthic microflora measured with high spatial resolution by the oxygen microprofile method: Capabilities and. 749.

2000-02-09T23:59:59.000Z

404

Download  

Science Journals Connector (OSTI)

53201. ABSTRACT. A numerical solution of Vollenweider's photosynthesis model is presented. This model provides for varying types and degrees of inhibition.

2000-02-12T23:59:59.000Z

405

Download  

Science Journals Connector (OSTI)

After 40 hr of darkness cultures show no signs of adaptation of photosynthesis to lower intensities. Attempts to reestablish growth after 100 hr failed.

406

Download  

Science Journals Connector (OSTI)

Apr 28, 1975 ... HESSLER, R. FL, J. D. ISAACS, AND E. L. MILLS. 1972. Giant amphipod from the .... depth that wind- and ship-induced cur- rents cannot cause ...

2000-01-04T23:59:59.000Z

407

Download  

Science Journals Connector (OSTI)

P. Frevert, Gregory Plowman, and Claudia Mills. Financial support has been given by ..... fected by factors such as wind and sinking protected against erosion by ...

2000-11-03T23:59:59.000Z

408

Download  

Science Journals Connector (OSTI)

Mar 5, 1982 ... G. Mills and E. Hoffman provided ... atures, bulkwater salinity, wind direction and speed ..... Summer wind patterns consisted of calm nights, light ...

2000-02-08T23:59:59.000Z

409

Download  

Science Journals Connector (OSTI)

and Civili 1991; Mills 1995; Brodeur et al. 2002). The occurrences of jellyfish .... Strong winds associated with the SW monsoon lead to high primary productivity.

2006-08-16T23:59:59.000Z

410

Download  

Science Journals Connector (OSTI)

time scales due to local wind events (c.g. Win- ant 1980) or to local effects of shoreline mor- ...... AND S. W. MILLS. 1992a. Active habitat selection by settling ...

1999-12-24T23:59:59.000Z

411

Download  

Science Journals Connector (OSTI)

lake has been de- scribed from the Australian region. Bayly .... lake is associated, in part, with geothermal heating. Monimolimnetic water is little more than ... level fell 2-3 m (L. Ryan, personal com- .... gions exported energy to downstream rc-.

1999-12-26T23:59:59.000Z

412

Download  

Science Journals Connector (OSTI)

When monochromatic light passes through a slit with an opening of the order .... erage in situ growth rate of 50 pm of length per day at 18°C (Lande ... of physics.

2000-01-04T23:59:59.000Z

413

Download  

Science Journals Connector (OSTI)

extracellular concentration or the rate of nutrient uptake. The model provides a useful ... lular compartments through which nutrient must pass before it becomes available ..... Department of Physics and Applied Physics. Strathclyde University.

414

Download  

Science Journals Connector (OSTI)

filtered and control LCs, which caused the sedimentation rates to increase during all the experiments, could not be attributed .... pass the 95-ym net while larger phytoplank- ton are retained ...... Lakes: Chemistry, geology, physics. Springer.

2000-03-06T23:59:59.000Z

415

Download  

Science Journals Connector (OSTI)

Aug 2, 1984 ... Center for Earth and Planetary Physics, Harvard University, Cambridge, Massachusetts 02 138. Abstract .... and distance along the axis of the Southwest Pass of ... Flow rates were steady for some time before and during.

2000-02-22T23:59:59.000Z

416

Download  

Science Journals Connector (OSTI)

valleys partially filled with stagnant ice, perennial lakes, seasonal melt ponds, and other periglacial features. The valley orien- tations, generally east-west, are a ...

2000-02-13T23:59:59.000Z

417

Download  

Science Journals Connector (OSTI)

Bacterial dissolved organic carbon demand in McMurdo Dry Valley lakes, Antarctica. Abstract—The ... xell, Hoare, and the east and west lobes of Lake Bonney,.

2001-06-21T23:59:59.000Z

418

Download  

Science Journals Connector (OSTI)

Mar 22, 1982 ... fresh specimens (Green 1957). The carot- enoid pigments ... Population oscillations and energy reserves in plankton. Cladocera and their ...

2000-02-24T23:59:59.000Z

419

Download  

Science Journals Connector (OSTI)

ied in space and time (Cummings et al. 1998 ..... a wide variety of resources such as living space, food, and refuge. .... Belle W. Baruch Library in Marine Sci-.

2001-11-07T23:59:59.000Z

420

Download  

Science Journals Connector (OSTI)

the space allowed for each topic did not always bear much relationship to its significance to ... and ecological library and consulted by most freshwater biologists.

2000-01-05T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Download  

Science Journals Connector (OSTI)

nological libraries. Botanists will also ... I would have preferred less space devoted to methods and ... dipped into, to be on the library shelves and pointed out to ...

2000-01-04T23:59:59.000Z

422

Download  

Science Journals Connector (OSTI)

his car to the Yale library. . . . I seem to remcmbcr that I was trying to find ... sions in both time and space are missing from our data. One striking phenomenon that.

2000-02-13T23:59:59.000Z

423

Download  

Science Journals Connector (OSTI)

space by physical features are characteristics of pop- ulations within species: .... It should be owned by every college library, no matter how small. As the authors ...

2000-03-05T23:59:59.000Z

424

Download  

Science Journals Connector (OSTI)

shiEts in half-wave potential with changes of pH and chl oridc concentration, they postulated that zinc in seawater exists mainly as the simple ion and as the ion.

2000-02-13T23:59:59.000Z

425

Download  

Science Journals Connector (OSTI)

Sep 29, 1975 ... Effects of polymeric charge variations on the proton-metal ion ... of soil extracts to bind metal ions is well chemical processes be evaluated.

2000-01-05T23:59:59.000Z

426

Download  

Science Journals Connector (OSTI)

Feb 25, 1974 ... NOTES. The effect of increases in the atmospheric carbon dioxide content on the carbonate ion concentration of surface ocean water at 25°C.

2000-01-03T23:59:59.000Z

427

Download  

Science Journals Connector (OSTI)

major dissolved constituents to such waters has received relatively scanty attention from limnologists. This paper records conccn- trations of total ions, Na, II

1999-12-13T23:59:59.000Z

428

Download  

Science Journals Connector (OSTI)

a significant decline in the carbonate ion concentration. (CO 22. 3 ) and ... and carbonate ions, respectively, and K9sp is the apparent solubility constant for ...

2006-04-12T23:59:59.000Z

429

Download  

Science Journals Connector (OSTI)

During work on the uptake of phosphate ions by clays and other minerals in sea ... Teflon resin adsorbed phosphate ions, but apparently at a slower rate than ...

430

Download  

Science Journals Connector (OSTI)

of ions, and the pT1 is slightly higher. The annual range of water temperature is from 10” to 36°C. In spring the surface may become as much as 5” warmer than ...

1999-12-16T23:59:59.000Z

431

Download  

Science Journals Connector (OSTI)

May 26, 1977 ... reduced sulfur an- ions, and organic matter. It works with pore water volumes as small as 1.0 ml, is rapid, precise, accurate, inexpensive, and.

2000-01-08T23:59:59.000Z

432

Download  

Science Journals Connector (OSTI)

Aug 8, 1994 ... Free aquo copper ion and zinc ion concentrations were determined in water samples ... plex interactions between trace metal ions, ligands, and.

433

Download  

Science Journals Connector (OSTI)

increase in concentration of calcium ions in freshwater recirculating over experimental surfaces. Stanton numbers. (St,,,, a dimensionless number giving the ratio ...

434

Download  

Science Journals Connector (OSTI)

1 This research was supported by U.S. Atomic. Energy Commission Contract No. ..... fects of tcmperaturc on orthophosphate ab- sorption by cxciscd corn roots.

2000-02-12T23:59:59.000Z

435

Download  

Science Journals Connector (OSTI)

Np [e.g. NpO,(CO,),“-] is quite possible. Similarly,. Fisher (1982) reported that phytoplankton cells had very low con- centration factors (~20) for Tc, which ex-.

2000-02-08T23:59:59.000Z

436

Download  

Science Journals Connector (OSTI)

precise (+ 20 nM, SD), however, even in the .... A + a - R = Np - Npo. AT .... 20. 25. Time (h). Time (h). Fig. 1. Time-course of surface experiments, station 202 and ...

2000-03-04T23:59:59.000Z

437

Download  

Science Journals Connector (OSTI)

portant in effecting heat and matter cx- change in ... the spacing between streaks produced by this mechanism should .... wrote : “The steam this morning covered about the whole .... welling in the streak zone had been pump- ing warm water to

2000-02-11T23:59:59.000Z

438

Download  

Science Journals Connector (OSTI)

Jan 4, 1985 ... lated lake in Norfolk, U.K. (National grid ref. TG 354196). It has an ..... uals) and neonate size (taken as the mini- mum size for free-swimming ...

2000-02-24T23:59:59.000Z

439

Download  

Science Journals Connector (OSTI)

Nov 13, 1990 ... microscopic fields (grid, 784 pm2; magnifi- cation, 984 x) or > 300 bacteria were ... Genetically labeled mini- cells, in an abundance equivalent ...

2000-03-18T23:59:59.000Z

440

Download  

Science Journals Connector (OSTI)

value, the control grid voltage being de- rived from ... the grid would not divert any of the small phototube .... range of depths as possible with the mini- mum of ...

1999-12-16T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Download  

Science Journals Connector (OSTI)

We found, however, that a mini- mum fresh-water rinse avoids the crystal ... brane ( type AA or HA, white, with grid). In order to obtain a random distribution.

1999-12-24T23:59:59.000Z

442

Download  

Science Journals Connector (OSTI)

tubes (piezometers) in a 3-by-3 grid pattern with centers 4 cm apart (Fig. 4). ..... groundwater flow using seepage meters and mini- piezometers. J. Geol. Educ.

2000-03-10T23:59:59.000Z

443

Download  

Science Journals Connector (OSTI)

5 m at all grid stations. Immediately ... grid were incubated for 24 h to eliminate time of day as a ..... for healthy diatoms of 0.05–0.1 might represent the mini-.

2003-08-25T23:59:59.000Z

444

Download  

Science Journals Connector (OSTI)

We found, however, that a mini- mum fresh-water ... brane ( type AA or HA, white, with grid). In order to obtain a ... offering a recognizable grid useful for counting.

1999-12-24T23:59:59.000Z

445

Download  

Science Journals Connector (OSTI)

just off the map to the north). Mount Vcniaminof undoubtedly dropped ... The beautiful cone of Mt. St. Augustine on an island in the mouth of Cook Inlet erupted

1999-12-13T23:59:59.000Z

446

Download  

Science Journals Connector (OSTI)

movement of the plume translocating coastal larvae off- shore, which also led to ..... Fellowship, Department of Marine Biology, James Cook Uni- versity of North ...

447

Download  

Science Journals Connector (OSTI)

Aug 24, 1981 ... off. Since preference for mosquitoes vs. Ceriodaphnia varied with mosquito size, it is likely that for each Notonectu instar. (II and older) th ere is ...

2000-02-08T23:59:59.000Z

448

Download  

Science Journals Connector (OSTI)

glucose, added combined nitrogen, light intensity, and temperature ... Rates of nitrogen fixation varied with light intensity. The rate ... of General Medical. Science ...

449

Download  

Science Journals Connector (OSTI)

Jan 2, 1996 ... matter in seawater and the atmosphere. Dimethylsulfide. (DMS) is ... considerable significance both in still water and in tur- bulent flow ..... under starvation and recovery conditions. ... derived cloud condensation nuclei. Nature

450

Download  

Science Journals Connector (OSTI)

Nov 15, 1980 ... water by Kalousek commutator technique. J. .... ble generator in a water reservoir and de- .... atmosphere by particles from bubbles in the sea.

2000-01-19T23:59:59.000Z

451

Download  

Science Journals Connector (OSTI)

removed by filtration, and the disc was dried and ..... formation and removal. ... the plot is additive, so that the top bar of the histogram indicates total frequency.

452

Download  

Science Journals Connector (OSTI)

Apr 15, 1986 ... phosphate by heating this vessel at 460°C. Total phosphorus and ..... termination of phosphorus in gasoline by flameless atomic absorption ...

2000-02-27T23:59:59.000Z

453

Download  

Science Journals Connector (OSTI)

June 1966 in conjunction with the Western Sections of the American Association for the Advancement of Science and the ... cember in Denver, Colorado.

454

Download  

Science Journals Connector (OSTI)

Dec 5, 1982 ... eral saline waters in western Victoria with partic- ular reference to ... vertebrates of a Colorado high mountain stream. Southwest. Nat. 25: 23-32 ...

2000-02-09T23:59:59.000Z

455

Download  

Science Journals Connector (OSTI)

longispina hybrids in Western Norway. Hydrobiologia 526: 55–62. KIEFER, F. 1978 ... littoral macrophyte zone of some Colorado lakes. Trans. Am. Microsc. Soc.

2006-10-05T23:59:59.000Z

456

Download  

Science Journals Connector (OSTI)

Department of Geological Sciences, Campus Box 250, University of Colorado, Boulder 80309. Abstract .... samples were collected from the western shore.

1999-12-22T23:59:59.000Z

457

Download  

Science Journals Connector (OSTI)

U.S. Geological Survey, Denver, Colorado 80225. Jon E. Sanger ... east to west, but the trend is less distinct. ... sota, and western South Dakota (Winter. 1977 ...

2000-02-08T23:59:59.000Z

458

Download  

Science Journals Connector (OSTI)

tude ponds in Colorado support two suites of epi- zoans. ... Program of the Colorado Natural Areas Program. .... western Baltic, infestations of this same epi-.

1999-12-22T23:59:59.000Z

459

Download  

Science Journals Connector (OSTI)

Colorado Division of Wildlife for monitoring salamander populations in western Colorado. Epibionts on zooplankton are thought to in- crease the visibility and ...

1999-12-24T23:59:59.000Z

460

Download  

Science Journals Connector (OSTI)

in sediments of three Colorado lakes. Benoit and Hemond (1987) showed that streams .... in four western Wash- ington lakes. Limnol. Oceanogr. 25: 240-247.

2000-02-28T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Download  

Science Journals Connector (OSTI)

in the western Baltic. Ophelia 31: 125–132. MORALES-BAQUERO, R. ... limitation in Colorado mountain lakes. Freshw. Biol. 20: 315–. 327. MURPHY, J., AND ...

2001-05-24T23:59:59.000Z

462

Download  

Science Journals Connector (OSTI)

subtracted and then smoothed with a 15-point moving poly- nomial fit (Savitsky ..... to develop an exponential model where the initial fluores- cence intensity (P)

463

Download  

Science Journals Connector (OSTI)

ocean surface to 5,000 m suggest a rapid decrease in the oxygen utilization rate from 300. ,ul O2 liter-' yr-l ... the construction of dynamic models of .... water temperatures under simulated in situ illumination ..... an automated Dumas procedure.

Orcas

2000-02-13T23:59:59.000Z

464

Download  

Science Journals Connector (OSTI)

considered valuable simulations of large sporadic eolian Fe dust deposition events .... depth (CTD) probe system model SBE 11 plus (Seabird ..... ranged from a rapid mean value of 2.5 h at inshore stations to a much ..... Automated determina-.

2010-05-21T23:59:59.000Z

465

Download  

Science Journals Connector (OSTI)

dataset or separately according to geographic region, less vari- ance was observed ...... has reported computing peaks in nuclear re- actor neutronic fluxes.

466

Download  

Science Journals Connector (OSTI)

Mar 31, 1980 ... condition and S. aZterni$oru production are related through a positive feedback loop. Re- .... Methods. Study area -Our investigations were carried out in the Great Sippewissett Salt ..... hydrogen peroxide production from the.

2000-01-18T23:59:59.000Z

467

Download  

Science Journals Connector (OSTI)

Nov 26, 1984 ... The rates of DMS production in the water column and its flux into the atmosphere across the ... traction methods are described in detail by. Froelich et al. (1983). ..... tion of hydrogen sulfide in natural waters. Limnol. Oceanogr.

2000-02-22T23:59:59.000Z

468

Download  

Science Journals Connector (OSTI)

level and rate of production or consumption of alkalinity in a .... alytical methods have changed during the ..... tal hydrogen sulfide production during sum-.

2000-03-03T23:59:59.000Z

469

Download  

Science Journals Connector (OSTI)

exchanged their data with us. Penny Chisholm, Alain. Soumia, and ... munities 4th Environment R&D Program under con- tract EV4V-0 11 -F. a-carotene, and ...

2000-03-10T23:59:59.000Z

470

Download  

Science Journals Connector (OSTI)

Dec 21, 1972 ... dicates whether the weaker gas vacuoles ... of cell turgor pressure, gas- ..... M. HALE. Department of Biology. Hostos Communit!y College ...

1999-12-28T23:59:59.000Z

471

Download  

Science Journals Connector (OSTI)

which oxygen gas, supplied under pressure from the surface (up ...... and gas exchange in Nova Scotia and Georgia salt- marsh muds. ... AND S. S. HALE. 1980.

2000-03-05T23:59:59.000Z

472

Download  

Science Journals Connector (OSTI)

About halE of the annual photosynthate .... gas-phase assay. Inoculated samples were ... gas-flow counter with Micromil window. The counting cfficicncy was ...

1999-12-26T23:59:59.000Z

473

Download  

Science Journals Connector (OSTI)

Jul 29, 1977 ... jar experiments similar to those of Hale. (1974). .... immediately after filtration by gas chro- matographic ... flange at the base) of Hale (1974) and.

2000-01-11T23:59:59.000Z

474

Download  

Science Journals Connector (OSTI)

respiration by plan ktonic organisms. Previous .... sary, data were converted to standard units of mass (pg C) and specific rates ..... cell size-a review. J. Phycol.

2000-03-06T23:59:59.000Z

475

Download  

Science Journals Connector (OSTI)

Review. Most manuscripts are sent initially to two referees; I have written ..... I plan to retire in June 1986, and the Society is inviting applications for the job of.

2000-02-13T23:59:59.000Z

476

Download  

Science Journals Connector (OSTI)

Jun 14, 1988 ... Editor Peter Jumars provided information relating to the review of ... will be to review the present status of the Society and to plan for the future.

477

Download  

Science Journals Connector (OSTI)

Sep 28, 1976 ... For filamentous blue-green algae of indefinite lengths, volumes ... of algae on the filters was relatively easy and ... oil immersion bright-field.

2000-01-08T23:59:59.000Z

478

Download  

Science Journals Connector (OSTI)

Jun 13, 1991 ... The higher feeding rate of M. afinis may explain its greater accumulation of .... sexually maturing animals (the year class born 1987 or before) in ...

2000-03-18T23:59:59.000Z

479

Download  

Science Journals Connector (OSTI)

Jul 3, 1972 ... the number of classes used for each estimate ... in a class can usually be determined from ... ficients of 0 or greater are obtained only if.

1999-12-27T23:59:59.000Z

480

Download  

Science Journals Connector (OSTI)

Sep 28, 1978 ... cantly greater relative amounts of pheopig- ments at 3.5 than at 0.5 h ... Vertical bars indicate range of G' values for each size class. SS-sunset;.

2000-01-09T23:59:59.000Z

Note: This page contains sample records for the topic "results download audit" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Download  

Science Journals Connector (OSTI)

(Natural History), London. 878 p. g15. A treatment of the ... Articles on the history and theory of underwater photography ... engineering. Philosophical. Library.

482

Download  

Science Journals Connector (OSTI)

... Tokyo University of Fisheries, 4-5-7 Konan, Minato-ku, Tokyo 108, Japan ... thetically active radiation (PAR) that is influenced by random cloud cover and that

483

Download  

Science Journals Connector (OSTI)

During a 23-d study of Lake Biwa, Japan (starting 23 August 1993), ...... Time series of lo-min-averaged mean and peak amphipod density and solar radiation.

484

Download  

Science Journals Connector (OSTI)

403) the Secchi disc disappears at about the level of 5% solar radiation (data of ..... structure of phytoplankton com- munity in some lakes of central Japan. Botan.

485

Download  

Science Journals Connector (OSTI)

Aug 20, 1973 ... the drum renders the system essentially spillproof, even ... IBP Handbook 16. Blackwell. MCKAY ... and the “critter catcher” of Powers and. Robertson ( 1965) ... rially affecting the operation of the device. In operation, water ...

2000-01-02T23:59:59.000Z

486

Download  

Science Journals Connector (OSTI)

1968. A practical handbook of seawater analysis. ... and lower buffer reservoirs and power supply as .... solve soluble anions in a single operation. It is not yet ... systems. Chem. Rev., 65 : 177-198. WILLIAMS, D. E., AND R. A. REISFELD. 1964.

2000-02-10T23:59:59.000Z

487

Download  

Science Journals Connector (OSTI)

Apr 24, 1981 ... RATE. Fig. 4. Light penetration at different depths in the water column. Measured before development of the algal bloQm, 17 April 1980 (0); ...

2000-01-19T23:59:59.000Z

488

Download  

Science Journals Connector (OSTI)

Oct 26, 1976 ... rates of 15N-labeled nitrate and am- monium were .... take rate for ammonium always exceeded .... rates of the 10% light-penetration depth.

2000-01-08T23:59:59.000Z

489

Download  

Science Journals Connector (OSTI)

We investigated the effect of seasonal environmental changes on the rate and ... to be controlled by oxygen and sulfate penetration, temperature, as well as ...

2005-10-25T23:59:59.000Z

490

Download  

Science Journals Connector (OSTI)

Nov 10, 1992 ... A spectrally averaged model of light penetration and photosynthesis. Thomas R. .... The maximum photosynthetic rate, PB,, is generally ...

1999-12-24T23:59:59.000Z

491

Download  

Science Journals Connector (OSTI)

Feb 6, 1979 ... Sciences Division, Department of Energy and Environment,. Brookhaven National Laboratory, Upton, New York 11973. Ahstruct. Based on ...

2000-01-12T23:59:59.000Z

492

Download  

Science Journals Connector (OSTI)

Jun 30, 1972 ... With a geared-down. ( 4 rpm ) electric motor and an eccentric wheel, a female of E. affinis, secured in a wire loop, was moved back and forth in.

1999-12-28T23:59:59.000Z

493

Download  

Science Journals Connector (OSTI)

market. Institute for Marine Studies. University of Washington. Seattle 98195. Wurren S. .... Increased energy costs have set in motion many changes, even in a

2000-01-09T23:59:59.000Z

494

Download  

Science Journals Connector (OSTI)

ture distribution and chemical composition of the waters ... temperature (56C at the depth of 1.32 m ) was reported ..... A sun-heated Antarctic lake. J. Gco- phys.

2000-02-13T23:59:59.000Z

495

Download  

Science Journals Connector (OSTI)

within sediment cores their distribution exhibited a 24-hr ... the setting sun has been discussed (Juday. 1921 .... ter temperature rises above 5C, the rhythm.

2000-02-11T23:59:59.000Z

496

Download  

Science Journals Connector (OSTI)

May 27, 1973 ... The vertical distribution of dissolved ox- ygcn in Lake ... cal distribution of temperature, and air ..... multiplied by the number of hours of sun-.

2000-01-03T23:59:59.000Z

497

Download  

Science Journals Connector (OSTI)

face distribution of epineustonic competent larvae of the gas- .... North-south wind speed (top panels) and 3 and 12 m depth temperature (bottom panels) registered during the .... larvae at the surface was observed a few hours before sun-.

tmiller@sun18

2002-06-25T23:59:59.000Z

498

Download  

Science Journals Connector (OSTI)

differing light regimes, as well as by temperatures of 5C or less, These critical low ... some offset stimulus from the setting sun. ..... Limnetic distribution and.

499

Download  

Science Journals Connector (OSTI)

vertical distribution of some common copepods in the Strait of ... posed, ranging from temperature or light gradients ... hole was completed as the sun was setting.

1999-12-25T23:59:59.000Z

500

Download  

Science Journals Connector (OSTI)

Phytoplankton distribution and photosynthesis dynamics in the Chubut River estuary. (Patagonia ... temperature, seasonal river runoff, and precipitation) and hydrodynamics (e.g. ...... from comparisons of shade and sun plants, p. 1–24. In N. R..

2009-10-12T23:59:59.000Z