National Library of Energy BETA

Sample records for restoration task force

  1. Army Energy Initiatives Task Force

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Army Energy Initiatives Task Force.

  2. Fuel oil quality task force

    SciTech Connect (OSTI)

    Laisy, J.; Turk, V.

    1997-09-01

    In April, 1996, the R.W. Beckett Corporation became aware of a series of apparently unrelated symptoms that made the leadership of the company concerned that there could be a fuel oil quality problem. A task force of company employees and industry consultants was convened to address the topic of current No. 2 heating oil quality and its effect on burner performance. The task force studied changes in fuel oil specifications and trends in properties that have occurred over the past few years. Experiments were performed at Beckett and Brookhaven National Laboratory to understand the effect of changes in some fuel oil properties. Studies by other groups were reviewed, and field installations were inspected to gain information about the performance of fuel oil that is currently being used in the U.S. and Canada. There was a special concern about the use of red dye in heating oils and the impact of sulfur levels due to the October, 1993 requirement of low sulfur (<0.05%) for on-highway diesel fuel. The results of the task force`s efforts were published in July, 1996. The primary conclusion of the task force was that there is not a crisis or widespread general problem with fuel oil quality. Localized problems that were seen may have been related to refinery practices and/or non-traditional fuel sources. System cleanliness is very important and the cause of many oil burner system problems. Finally, heating oil quality should get ongoing careful attention by Beckett engineering personnel and heating oil industry groups.

  3. Nuclear Radiological Threat Task Force Established | National...

    National Nuclear Security Administration (NNSA)

    Nuclear Radiological Threat Task Force Established Washington, DC NNSA's Administrator Linton Brooks announces the establishment of the Nuclear Radiological Threat Reduction Task ...

  4. Weardale Task Force | Open Energy Information

    Open Energy Info (EERE)

    that is developing a sustainable community in the East gate area which will be run on wind, solar, biomass, geothermal and hydro power. References: Weardale Task Force1...

  5. Interagency Energy Management Task Force Members

    Broader source: Energy.gov [DOE]

    The Interagency Energy Management Task Force is led by the Federal Energy Management Program director. Members include energy and sustainability managers from federal agencies.

  6. Muon Collider Task Force Report

    SciTech Connect (OSTI)

    Ankenbrandt, C.; Alexahin, Y.; Balbekov, V.; Barzi, E.; Bhat, C.; Broemmelsiek, D.; Bross, A.; Burov, A.; Drozhdin, A.; Finley, D.; Geer, S.; /Fermilab /Argonne /Brookhaven /Jefferson Lab /LBL, Berkeley /MUONS Inc., Batavia /UCLA /UC, Riverside /Mississippi U.

    2007-12-01

    Muon Colliders offer a possible long term path to lepton-lepton collisions at center-of-mass energies {radical}s {ge} 1 TeV. In October 2006 the Muon Collider Task Force (MCTF) proposed a program of advanced accelerator R&D aimed at developing the Muon Collider concept. The proposed R&D program was motivated by progress on Muon Collider design in general, and in particular, by new ideas that have emerged on muon cooling channel design. The scope of the proposed MCTF R&D program includes muon collider design studies, helical cooling channel design and simulation, high temperature superconducting solenoid studies, an experimental program using beams to test cooling channel RF cavities and a 6D cooling demonstration channel. The first year of MCTF activities are summarized in this report together with a brief description of the anticipated FY08 R&D activities. In its first year the MCTF has made progress on (1) Muon Collider ring studies, (2) 6D cooling channel design and simulation studies with an emphasis on the HCC scheme, (3) beam preparations for the first HPRF cavity beam test, (4) preparations for an HCC four-coil test, (5) further development of the MANX experiment ideas and studies of the muon beam possibilities at Fermilab, (6) studies of how to integrate RF into an HCC in preparation for a component development program, and (7) HTS conductor and magnet studies to prepare for an evaluation of the prospects for of an HTS high-field solenoid build for a muon cooling channel.

  7. FAQS Job Task Analyses- Environmental Restoration

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  8. Clinch River MRS Task Force Recommendations

    Broader source: Energy.gov [DOE]

    The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the...

  9. Climate Change Task Force Webinar Series | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State, Local, and Tribal Leaders Task Force on Climate Preparedness and Resilience. ... Task Force on Climate Preparedness and Resilience, established by an Executive Order in ...

  10. Task Force on Climate Preparedness and Resilience Announces Tribal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Force on Climate Preparedness and Resilience Announces Tribal Climate Resilience Program Task Force on Climate Preparedness and Resilience Announces Tribal Climate Resilience ...

  11. Linkage to Previous International PV Module QA Task Force Workshops...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Linkage to Previous International PV Module QA Task Force Workshops: Proposal for Rating System Linkage to Previous International PV Module QA Task Force Workshops: Proposal for ...

  12. Collaborative Utility Task Force Partners with DOE to Develop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure Collaborative Utility Task Force Partners with DOE to ...

  13. Federal Task Force Sends Recommendations to President on Fostering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology ...

  14. Departmental Response: SEAB Task Force Recommendations on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Departmental Response: SEAB Task Force Recommendations on Technology Development for Environmental Management Introduction In May 2014, Energy Secretary Ernest Moniz charged the Secretary of Energy Advisory Board (SEAB) to provide advice as to how the United States (U.S.) Department of Energy (DOE) could more effectively ensure the development of technology necessary for the Office of Environmental Management (EM) to complete its mission, cleanup of legacy waste sites. The SEAB formed a Task

  15. U.S. Transport Task Force 2010

    SciTech Connect (OSTI)

    Diamond, P.H.

    2011-09-21

    The Transport Task Force (TTF) Meeting is a venue for vigorous scientific discourse and discussion on topics in transport and turbulence in fusion plasmas. Its participation is international. The 2010 meeting was highly effective, with 139 registered participants and 131 presentations. This is remarkable for an even year (IAEA year) meeting. The meeting clearly fostered progress in understanding and control of turbulent transport.

  16. Federal Smart Grid Task Force | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Smart Grid Task Force Federal Smart Grid Task Force Task Force Background The Federal Smart Grid Task Force was established under Title XIII of the Energy Independence and Security Act of 2007 (EISA) and includes experts from eleven Federal agencies. The Department of Energy is represented by the Office of Electricity Delivery and Energy Reliability which is the Task Force lead, as well as the Office of Energy Efficiency and Renewable Energy and the National Energy Technology Laboratory.

  17. Interagency Energy Management Task Force Members | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interagency Energy Management Task Force Members Interagency Energy Management Task Force Members The Interagency Energy Management Task Force is led by the Federal Energy Management Program director. Members include energy and sustainability managers from federal agencies. Task Force Executive Director Dr. Timothy Unruh U.S. Department of Energy 202-586-5772 Task Force Members Organization Primary Contact Alternate Contact General Services Administration Mark Ewing Karren Curran National

  18. Illinois task force on global climate change

    SciTech Connect (OSTI)

    Griffin, B.S.

    1996-12-31

    The purpose of this report is to document progress in the areas of national policy development, emissions reduction, research and education, and adaptation, and to identify specific actions that will be undertaken to implement the Illinois state action plan. The task force has been tracking national and international climate change policy, and helping shape national policy agenda. Identification and implementation of cost-effective mitigation measures has been performed for emissions reduction. In the area of research and education, the task force is developing the capacity to measure climate change indicators, maintaining and enhancing Illinois relevant research, and strengthening climate change education. Activities relevant to adaptation to new policy include strengthening water laws and planning for adaptation. 6 figs., 4 tabs.

  19. Clean Air Task Force CATF | Open Energy Information

    Open Energy Info (EERE)

    Force (CATF) Place: Boston, Massachusetts Zip: 2108 Product: Massachusetts-based scientific research and legal advocacy center. References: Clean Air Task Force (CATF)1 This...

  20. Interagency Energy Management Task Force | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Management Task Force Interagency Energy Management Task Force The Federal Interagency Energy Management Task Force was created by the Federal Energy Management Improvement Act of 1988 to coordinate federal government activities that encourage energy conservation and energy efficiency. Led by the Federal Energy Management Program director and composed of federal energy managers, this task force serves as a forum for: Sharing lessons learned across agencies Providing analysis on technical

  1. V.P. Biden Hosts the Middle Class Task Force

    Broader source: Energy.gov [DOE]

    Secretary Chu will join Vice President Biden at the White House as he hosts a Middle Class Task Force event.

  2. Draft Report of the Task Force on Methane Hydrates

    Broader source: Energy.gov [DOE]

    This report presents the findings and recommendations for the Secretary of Energy Advisory Board (SEAB) Task Force on Methane Hydrates.

  3. GeoVision Study Task Forces | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Study Task Forces GeoVision Study Task Forces The Energy Department's GeoVision Study is undertaking rigorous analysis in seven specific topic areas that are led by team members from our national labs. Each task force will produce a deliverable required by the scope of the project. Task forces will be coordinated by the National Renewable Energy Laboratory. I. Exploration: Lab Lead - Lawrence Berkeley National Laboratory How geothermal resources are identified today Exploration costs and risks

  4. Report of the Task Force on Methane Hydrates

    Broader source: Energy.gov [DOE]

    This report presents the findings and recommendations for the Secretary of Energy Advisory Board (SEAB) Task Force on Methane Hydrates.

  5. Interagency Energy Management Task Force | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the Federal Energy Management Program » Interagency Energy Management Task Force Interagency Energy Management Task Force The Federal Interagency Energy Management Task Force was created by the Federal Energy Management Improvement Act of 1988 to coordinate federal government activities that encourage energy conservation and energy efficiency. Led by the Federal Energy Management Program director and composed of federal energy managers, this task force serves as a forum for: Sharing

  6. Nuclear Radiological Threat Task Force Established | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Radiological Threat Task Force Established Nuclear Radiological Threat Task Force Established Washington, DC NNSA's Administrator Linton Brooks announces the establishment of the Nuclear Radiological Threat Reduction Task Force (NRTRTF) to combat the threats posed by radiological dispersion devices or "dirty bombs."

  7. CCS Task Force - Executive Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CCS Task Force - Executive Summary CCS Task Force - Executive Summary CCS Task Force - Executive Summary (90.47 KB) More Documents & Publications CCSTF - Final Report Before the Senate Energy and Natural Resources Committee Before the House Science, Space, and Technology Subcommittee on Energy and Environment

  8. U.S. - Canada Power System Outage Task Force: Final Report on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the ...

  9. Transport Task Force (TTF) 2011 | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 6, 2011, 9:00am to April 9, 2011, 5:00pm Conference Bahia Resort Hotel San Diego, CA USA Transport Task Force (TTF) 2011 The ultimate goal of the work of the Transport Task...

  10. Task Force on Biofuels Infrastructure | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Force on Biofuels Infrastructure Task Force on Biofuels Infrastructure Under the federal Renewable Fuels Standard (RFS) adopted in 2005 and amended in 2007, the United States is committed to a substantial (five-fold) increase in its use of biofuels by 2022. The National Commission on Energy Policy (NCEP) convened a Biofuels Infrastructure Task Force in 2008 to examine the infrastructure implications of this relatively swift and unprecedented shift in the composition of the nation's

  11. Federal Task Force Sends Recommendations to President on Fostering Clean

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coal Technology | Department of Energy Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology August 12, 2010 - 12:00am Addthis WASHINGTON - President Obama's Interagency Task Force on Carbon Capture and Storage (CCS), co-chaired by the U.S. Environmental Protection Agency (EPA) and the Department of Energy (DOE), delivered a series of recommendations to the president today on

  12. Microsoft Word - Energy Code Enforcement Funding Task Force - Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    [Final].docx | Department of Energy Energy Code Enforcement Funding Task Force - Fact Sheet [Final].docx Microsoft Word - Energy Code Enforcement Funding Task Force - Fact Sheet [Final].docx Microsoft Word - Energy Code Enforcement Funding Task Force - Fact Sheet [Final].docx (221.19 KB) More Documents & Publications Sonoma County Solar Implementation Plan Final Report - Grow Solar Wisconsin Team Energy Industry Days Additional Information

  13. University Research Reactor Task Force to the Nuclear Energy Research

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advisory Committee | Department of Energy University Research Reactor Task Force to the Nuclear Energy Research Advisory Committee University Research Reactor Task Force to the Nuclear Energy Research Advisory Committee In mid-February, 2001 The University Research Reactor (URR) Task Force (TF), a sub-group of the Department of Energy (DOE) Nuclear Energy Research Advisory Committee (NERAC), was asked to: * Analyze information collected by DOE, the NERAC "Blue Ribbon Panel,"

  14. Collaborative Utility Task Force Partners with DOE to Develop Cyber

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Requirements for Advanced Metering Infrastructure | Department of Energy Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure The Advanced Metering Infrastructure Security (AMI-SEC) Task Force announces the release of the AMI System Security Requirements, a first-of-its-kind for the

  15. Hydropower Vision Task Force Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Hydropower Vision Task Force Charter.pdf More Documents & Publications State Energy Advisory Board November 2011 Meeting Guide to Community Energy Strategic Planning State ...

  16. Interagency Task Force Report on Agency Recommendations, Conditions...

    Open Energy Info (EERE)

    Agriculture, Environmental Protection Agency, Advisory Council on Historic Preservation (Work Group on the Coordination of Federal Mandates). 2001. Interagency Task Force Report...

  17. Sandia Energy - New Mexico Renewable Energy Storage Task Force

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Renewable Energy Storage Task Force Home Infrastructure Security Renewable Energy Energy Partnership News News & Events Energy Storage Systems Energy Storage New Mexico Renewable...

  18. Transmission Services WIST Task Force Dynamic Transfer Capability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ("WIST"), a Task Force of technical staff primarily from Northwest and California transmission providers and sub-regional entities, completed a report documenting Phase 1 of its...

  19. Report of the Task Force on Statewide Transmission Siting and...

    Open Energy Info (EERE)

    the Task Force on Statewide Transmission Siting and Permitting (Colorado). NA: Colorado Public Utilities Commission. Retrieved from "http:en.openei.orgwindex.php?titleReport...

  20. October 9, 2014- SEAB Task Force Meeting

    Broader source: Energy.gov [DOE]

    SECRETARY OF ENERGY ADVISORY BOARDTask Force Meeting on Technology Development for Environmental Management (EM)

  1. ARI Task Force, ECA Work to Stimulate Regional Economies

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – DOE’s Asset Revitalization Initiative (ARI) Task Force met with the Energy Communities Alliance (ECA) this week to advance the Department’s processes for transferring excess land...

  2. Report of the SEAB Hubs+ Task Force | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    the new Funding Constructs for Energy Research and Development (R&D) in the Department of Energy. The Task Force was charged with assisting the DOE in evaluating the management and...

  3. Asset Revitalization Initiative Task Force Issues Its Second Report

    Broader source: Energy.gov [DOE]

    The Asset Revitalization Initiative (ARI) Task Force is pleased to announce the release of its second report providing information to the public on historic actions to reuse U.S. Department of...

  4. The Secretary of Energy Advisory Board Task Force to Support...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... SEAB Hubs + Report DOE Response to SEAB Hubs+ Report SEAB Task Force on HubsEFRCsBRCsARPA-E Members: Cherry Murray, Harvard University, TF Chair, * Rafael Bras, Georgia ...

  5. Colorado - Report of the Task Force on Statewide Transmission...

    Open Energy Info (EERE)

    Colorado - Report of the Task Force on Statewide Transmission Siting and Permitting Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Colorado - Report of...

  6. Report of the Fermilab ILC Citizens' Task Force

    SciTech Connect (OSTI)

    2008-06-01

    Fermi National Accelerator Laboratory convened the ILC Citizens' Task Force to provide guidance and advice to the laboratory to ensure that community concerns and ideas are included in all public aspects of planning and design for a proposed future accelerator, the International Linear Collider. In this report, the members of the Task Force describe the process they used to gather and analyze information on all aspects of the proposed accelerator and its potential location at Fermilab in northern Illinois. They present the conclusions and recommendations they reached as a result of the learning process and their subsequent discussions and deliberations. While the Task Force was charged to provide guidance on the ILC, it became clear during the process that the high cost of the proposed accelerator made a near-term start for the project at Fermilab unlikely. Nevertheless, based on a year of extensive learning and dialogue, the Task Force developed a series of recommendations for Fermilab to consider as the laboratory develops all successor projects to the Tevatron. The Task Force recognizes that bringing a next-generation particle physics project to Fermilab will require both a large international effort and the support of the local community. While the Task Force developed its recommendations in response to the parameters of a future ILC, the principles they set forth apply directly to any large project that may be conceived at Fermilab, or at other laboratories, in the future. With this report, the Task Force fulfills its task of guiding Fermilab from the perspective of the local community on how to move forward with a large-scale project while building positive relationships with surrounding communities. The report summarizes the benefits, concerns and potential impacts of bringing a large-scale scientific project to northern Illinois.

  7. First interim report of the Federal Fleet Conversion Task Force

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The Federal Fleet Conversion Task Force was created by Executive Order 12844, signed by President Clinton on April 21, 1993. In the Order, the President directed that purchases of alternative fueled vehicles by the Federal Government be substantially increased beyond the levels required by current law. The President charged the Task Force with developing recommendations for carrying out the Executive Order, with special emphasis on setting a course that will lead to the widespread use of alternative fueled vehicles by Federal, State, and local government fleets, by private fleets and, ultimately, by individuals. The chief recommendation of the Task Force is the establishment of a Presidential Clean Cities Initiative. To support creation of the Presidential Initiative, the Task Force identified 38 cities and regions, prioritized into three tiers, for concentrating the Initiative`s efforts in Fiscal Years 1994 through 1996. This concentration of effort is key to the effectiveness of the Initiative. The 38 cities and regions would receive priority funding for Federal vehicle purchases and for infrastructure development. In addition, the Task Force has made specific recommendations for overcoming numerous regulatory, economic, and technical barriers that have slowed the introduction of alternative fueled vehicles into general use.

  8. Secretary of Energy Advisory Board (SEAB) Task Force on EM Technology...

    Energy Savers [EERE]

    Secretary of Energy Advisory Board (SEAB) Task Force on EM Technology Development Secretary of Energy Advisory Board (SEAB) Task Force on EM Technology Development Presentation...

  9. The Secretary of Energy Advisory Board (SEAB) Task Force on DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Secretary of Energy Advisory Board (SEAB) Task Force on DOE National Laboratories The Secretary of Energy Advisory Board (SEAB) Task Force on DOE National Laboratories The...

  10. Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The natural resources of the Gulf’s ecosystem are vital to many of the region’s industries that directly support economic progress and job creation, including tourism and recreation, seafood...

  11. Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    industries that directly support economic progress and job creation, including tourism and recreation, seafood production and sales, energy production and navigation and commerce. ...

  12. Operation Ivy. Joint Task Force 132, 1952. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    This report covers the activities of the Joint Task Force 132 in Operation Ivy, in 1952 at Eniwetok Atoll. Shots Mike and King were detonated in conjunction with eleven experimental programs. This report describes the device, weapon, and experimental programs, giving as many preliminary conclusions as can be drawn from early analysis of the data.

  13. Department of Energy Establishes Asset Revitalization Task Force

    Broader source: Energy.gov [DOE]

    Washington, D.C. – Secretary of Energy Steven Chu today announced the establishment of a Task Force on Asset Revitalization to facilitate a discussion among the Department of Energy, communities around DOE sites, nonprofits, tribal governments, the private sector and other stakeholders to identify reuse approaches as environmental cleanup efforts reach completion.

  14. Urban Consortium Energy Task Force - Year 21 Final Report

    SciTech Connect (OSTI)

    2003-04-01

    The Urban Consortium Energy Task Force (UCETF), comprised of representatives of large cities and counties in the United States, is a subgroup of the Urban Consortium, an organization of the nation's largest cities and counties joined together to identify, develop and deploy innovative approaches and technological solutions to pressing urban issues.

  15. U.S. - Canada Power System Outage Task Force: Final Report on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Task Force Recommendations | Department of Energy - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan,

  16. Sandia-Power Surety Task Force Hawaii foam analysis.

    SciTech Connect (OSTI)

    McIntyre, Annie

    2010-11-01

    The Office of Secretary of Defense (OSD) Power Surety Task Force was officially created in early 2008, after nearly two years of work in demand reduction and renewable energy technologies to support the Warfighter in Theater. The OSD Power Surety Task Force is tasked with identifying efficient energy solutions that support mission requirements. Spray foam insulation demonstrations were recently expanded beyond field structures to include military housing at Ft. Belvoir. Initial results to using the foam in both applications are favorable. This project will address the remaining key questions: (1) Can this technology help to reduce utility costs for the Installation Commander? (2) Is the foam cost effective? (3) What application differences in housing affect those key metrics? The critical need for energy solutions in Hawaii and the existing relationships among Sandia, the Department of Defense (DOD), the Department of Energy (DOE), and Forest City, make this location a logical choice for a foam demonstration. This project includes application and analysis of foam to a residential duplex at the Waikulu military community on Oahu, Hawaii, as well as reference to spray foam applied to a PACOM facility and additional foamed units on Maui, conducted during this project phase. This report concludes the analysis and describes the utilization of foam insulation at military housing in Hawaii and the subsequent data gathering and analysis.

  17. The Secretary of Energy Advisory Board (SEAB) Task Force on Methane

    Energy Savers [EERE]

    Hydrates | Department of Energy Methane Hydrates The Secretary of Energy Advisory Board (SEAB) Task Force on Methane Hydrates The Secretary of Energy Advisory Board (SEAB) Task Force on Methane Hydrates is composed of SEAB members and independent experts charged with recommending a framework for DOE methane hydrate research programs. Purpose of the Task Force: The purpose of this task force is to provide a framework for DOE's pre-commercial methane hydrate research effort, in particular, the

  18. Interagency Task Force on Carbon Capture and Storage | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interagency Task Force on Carbon Capture and Storage Interagency Task Force on Carbon Capture and Storage On February 3, 2010, President Obama sent a memorandum to the heads of fourteen Executive Departments and Federal Agencies establishing an Interagency Task Force on Carbon Capture and Storage. The goal was to develop a comprehensive and coordinated Federal strategy to speed the commercial development and deployment of clean coal technologies. The Task Force, co-chaired by the Department of

  19. Interim Report of the Task Force on DOE National Laboratories | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Interim Report of the Task Force on DOE National Laboratories Interim Report of the Task Force on DOE National Laboratories The SEAB Task Force on DOE National Laboratories was established by the Secretary of Energy on June 16, 2014, to provide advice, guidance, and recommendations on important issues related to improving the health and management of the labs. The Task Force has been charged to review past studies, Congressional reports and direction, and Departmental deliberations

  20. Secretary of Energy Advisory Board (SEAB) Task Force on EM Technology Development

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by Gerald Boyd, Vice President, Stoller Newport News Nuclear; Task Force Member.

  1. January 6, 2014 SEAB FracFocus 2.0 Task Force Meeting

    Broader source: Energy.gov [DOE]

    SECRETARY OF ENERGY ADVISORY BOARDFRACFOCUS 2.0 TASK FORCE MEETINGJanuary 6, 20141000 Independence Avenue, SW, Washington, DC

  2. Government Applications Task Force ground truth study of WAG 4

    SciTech Connect (OSTI)

    Evers, T.K.; Smyre, J.L.; King, A.L.

    1997-06-01

    This report documents the Government Applications Task Force (GATF) Buried Waste Project. The project was initiated as a field investigation and verification of the 1994 Strategic Environmental Research and Development Program`s (SERDP) Buried Waste Identification Project results. The GATF project team included staff from three US Department of Energy (DOE) Laboratories [Oak Ridge National Laboratory (ORNL), Los Alamos National Laboratory (LANL), and the Savannah River Technology Center (SRTC)] and from the National Exploitation Laboratory. Similar studies were conducted at each of the three DOE laboratories to demonstrate the effective use of remote sensing technologies. The three locations were selected to assess differences in buried waste signatures under various environmental conditions (i.e., climate, terrain, precipitation, geology, etc.). After a brief background discussion of the SERDP Project, this report documents the field investigation (ground truth) results from the 1994--1995 GATF Buried Waste Study at ORNL`s Waste Area Grouping (WAG) 4. Figures for this report are located in Appendix A.

  3. The Secretary of Energy Advisory Board (SEAB) Task Force on Next Generation

    Energy Savers [EERE]

    High Performance Computing | Department of Energy Next Generation High Performance Computing The Secretary of Energy Advisory Board (SEAB) Task Force on Next Generation High Performance Computing The Secretary of Energy Advisory Board (SEAB) Task Force on Next Generation High Performance Computing is composed of SEAB members and independent experts charged with reviewing the mission and national capabilities related to next generation high performance computing. The Task Force will examine

  4. Updates on the Interagency Task Force on Natural Gas Storage Safety -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working with Stakeholders | Department of Energy Updates on the Interagency Task Force on Natural Gas Storage Safety - Working with Stakeholders Updates on the Interagency Task Force on Natural Gas Storage Safety - Working with Stakeholders June 7, 2016 - 1:11pm Addthis Updates on the Interagency Task Force on Natural Gas Storage Safety – Working with Stakeholders Franklin (Lynn) Orr Franklin (Lynn) Orr Under Secretary for Science and Energy Marie Therese Dominguez Marie Therese

  5. The Secretary of Energy Advisory Board (SEAB) Task Force on Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Management Program (FEMP) and recommending a set of actions to advance it. The Task Force's work should be based on information provided by DOE's FEMP and related programs, ...

  6. Report of the Task Force on FracFocus 2.0 | Department of Energy

    Energy Savers [EERE]

    Task Force on FracFocus 2.0 Report of the Task Force on FracFocus 2.0 This report presents the findings and recommendations for the Secretary of Energy Advisory Board (SEAB) Task Force on FracFocus. The Task Force was charged with reviewing how FracFocus 2.0 houses the information Federal and State regulatory agencies require as part of their regulatory functions with regard to disclosure of the composition and quantities of fracturing fluids injected into unconventional oil and gas wells. This

  7. July 15, 2014 SEAB Task Force Meeting on Technology Development for Environmental Management

    Broader source: Energy.gov [DOE]

    The SEAB Task Force on Technology Development for Environmental Management met at U.S. Department of Energy in Washington, DC.

  8. The Secretary of Energy Advisory Board (SEAB) Task Force on Nuclear Nonproliferation

    Broader source: Energy.gov [DOE]

    The Secretary of Energy Advisory Board (SEAB) Task Force on Nuclear Nonproliferation comprises SEAB members and individuals with expertise and experience in the technologies, institutions, and...

  9. Linkage to Previous International PV Module QA Task Force Workshops; Proposal for Rating System (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.; Wohlgemuth, J.; Sample, T.; Yamamichi, M.; Kondo, M.

    2013-05-01

    This presentation gives the historical background of the creation of the International PV QA Task Force as an introduction to the PV Module Reliability Workshop.

  10. The NEPA Task Force Report to the Council on Environmental Quality: Modernizing NEPA Implementation (CEQ, 2003)

    Broader source: Energy.gov [DOE]

    This report presents the results of research and consultations by the National Environmental Policy Task Force concerning the implementation of the environmental impact analysis requirement of the National Environmental Policy Act (NEPA). The task force interviewed federal agencies; reviewed public comments, literature, reports, and case studies; and spoke with individuals and representatives from federal, state, and local governments, tribes, and interest groups.

  11. January 6, 2014 SEAB FracFocus 2.0 Task Force Meeting Minutes

    Broader source: Energy.gov [DOE]

    The SEAB FracFocus 2.0 Task Force, chaired by John Deutch, held its first meeting on January 6, 2014.  The Task Force is charged with reviewing how FracFocus 2.0 houses the information Federal and...

  12. Appendix 3. Task Force Meeting Agendas and Materials Reviewed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Force Meeting Agenda December 3-4, 2013 Lawrence Livermore National Laboratory HPCIC, Yosemite Room 7000 East Avenue Livermore, CA Tuesday, December 3 4:00-4:15 PM Introductions ...

  13. The Secretary of Energy Advisory Board Task Force to Support Evaluation of

    Energy Savers [EERE]

    the New Funding Constructs for Energy Research and Development (R&D) in the Department of Energy | Department of Energy Task Force to Support Evaluation of the New Funding Constructs for Energy Research and Development (R&D) in the Department of Energy The Secretary of Energy Advisory Board Task Force to Support Evaluation of the New Funding Constructs for Energy Research and Development (R&D) in the Department of Energy The Secretary of Energy Advisory Board Task Force to

  14. Blackout 2003: U.S. - Canada Task Force Presents Final Report...

    Energy Savers [EERE]

    U.S. Secretary of Energy, and the Honorable R. John Efford, Minister of Natural Resources Canada, released the Final Report of the U.S. -Canada Power System Outage Task Force. ...

  15. The Secretary of Energy Advisory Board (SEAB) Task Force on DOE National Laboratories

    Broader source: Energy.gov [DOE]

    The Secretary of Energy Advisory Board (SEAB) Task Force on DOE National Laboratories (Labs) was created to provide advice, guidance, and recommendations on important issues related to improving...

  16. The Secretary of Energy Advisory Board (SEAB) Task Force on FracFocus 2.0

    Broader source: Energy.gov [DOE]

    The Secretary of Energy Advisory Board (SEAB) Task Force on FracFocus 2.0 is composed of individuals with expertise and experience charged with reviewing how FracFocus 2.0 houses the information...

  17. Blackout 2003: Conference for public review draft report on implementation of the task force recommendations

    Broader source: Energy.gov [DOE]

    On Thursday, June 22, in Washington, D.C., the U.S.-Canada Power System Outage Task Force will hold a conference for stakeholders and the public to comment on the draft of the final report of the...

  18. The Secretary of Energy Advisory Board (SEAB) Task Force to Support the Quadrennial Energy Review Process

    Broader source: Energy.gov [DOE]

    The Secretary of Energy Advisory Board (SEAB) Task Force to support the Quadrennial Energy Review Process is composed of SEAB members and independent experts, with experience in energy policy and...

  19. Microsoft Word - SEAB Lab Task Force Interim Report Final.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Secretary of Energy Task Force on DOE National Laboratories June 17, 2015 This page intentionally left blank 1 EXECUTIVE SUMMARY This interim report of the Secretary of Energy Advisory Board (SEAB) National Laboratory Task Force (TF) identifies the constraints on and evaluates the effectiveness of laboratory operations that impact the performance and efficiency of the DOE national laboratories. The TF stresses the overriding importance of two actions: clarifying the authorities and

  20. Report of the Infrastructure Task Force of the Nuclear Energy Research

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advisory Committee | Department of Energy Report of the Infrastructure Task Force of the Nuclear Energy Research Advisory Committee Report of the Infrastructure Task Force of the Nuclear Energy Research Advisory Committee On October 1, 2002 the DOE Nuclear Energy Research Advisory Committee was asked to provide specific, focused updates to its Nuclear Science and Technology Infrastructure Roadmap and review the specific issues at the DOE key nuclear energy research and development (R&D)

  1. Final Strategic Plan Released by Gulf Coast Ecosystem Restoration Taskforce

    Office of Energy Efficiency and Renewable Energy (EERE)

    Today (December 5) the Gulf Coast Ecosystem Restoration Task Force released its final strategy for long-term restoration in the Gulf, a path forward based on input from states, tribes, federal...

  2. Conference-EC-US Task Force Joint US-EU Workshop on Metabolomics and Environmental Biotechnology

    SciTech Connect (OSTI)

    PI: Lily Y. Young Co-PI: Gerben J. Zylstra

    2009-06-04

    Since 1990, the EC-US Task Force on Biotechnology Research has been coordinating transatlantic efforts to guide and exploit the ongoing revolution in biotechnology and the life sciences. The Task Force was established in June 1990 by the European Commission and the White House Office of Science and Technology Policy. The Task Force has acted as an effective forum for discussion, coordination, and development of new ideas for the last 18 years. Task Force members are European Commission and US Government science and technology administrators who meet annually to enhance communication across the Atlantic, and to encourage collaborative research. Through sponsoring workshops, and other activities, the Task Force also brings together scientific leaders and early career researchers from both sides of the Atlantic to forecast research challenges and opportunities and to promote better links between researchers. Over the years, by keeping a focus on the future of science, the Task Force has played a key role in establishing a diverse range of emerging scientific fields, including biodiversity research, neuroinformatics, genomics, nanobiotechnology, neonatal immunology, transkingdom molecular biology, biologically-based fuels, and environmental biotechnology. The EC-US Task Force has sponsored a number of Working Groups on topics of mutual transatlantic interest. The idea to create a Working Group on Environmental Biotechnology research was discussed in the Task Force meeting of October 1993. The EC-US Working Group on Environmental Biotechnology set as its mission 'To train the next generation of leaders in environmental biotechnology in the United States and the European Union to work collaboratively across the Atlantic.' Since 1995, the Working Group supported three kinds of activities, all of which focus one early career scientists: (1) Workshops on the use of molecular methods and genomics in environmental biotechnology; (2) Short courses with theoretical, laboratory

  3. Data summary for the near-shore sediment characterization task of the Clinch River Environmental Restoration Program

    SciTech Connect (OSTI)

    Levine, D.A.; Hargrove, W.W.; Campbell, K.R.; Wood, M.A.; Rash, C.D.

    1994-10-01

    This report presents the results of the Near-Shore Sediment Characterization Task of the Clinch River Environmental Restoration Program (CR-ERP). The goals of the task were to (1) determine the extent to which near-shore surface sediments are contaminated by releases from the Oak Ridge Reservation (ORR) and (2) provide data for the Watts Bar Reservoir Interagency Permitting Group (WBRIPG) to evaluate the human health risks from exposure to sediments during and following dredging operations. The data collected for this task are also to be used in the Remedial Investigation/Feasibility Study (RLTS) for the CR-ERP operable units (Lower Watts Bar and Clinch River) to characterize the human health risk associated with exposure to near-shore sediments throughout the Watts Bar Reservoir.

  4. Task Force on Climate Preparedness and Resilience Announces Tribal Climate Resilience Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    On July 16, at the fourth and final meeting of the White House State, Local, and Tribal Leaders Task Force on Climate Preparedness and Resilience, the Administration announced the new Tribal Climate Resilience Program to help tribes prepare for climate change.

  5. Linkage to Previous International PV Module QA Task Force Workshops: Proposal for Rating System

    Broader source: Energy.gov [DOE]

    This PowerPoint presentation, focused on humidity, temperature and voltage testing, was originally presented at the NREL 2013 PV Module Reliability Workshop on Feb. 26-27, 2013 in Denver, CO. It summarizes the efforts of previous QA task forces and proposes a QA rating system to differentiate the relative durability of model designs.

  6. Direct space-charge effects on the ILC damping rings: Task ForceReport

    SciTech Connect (OSTI)

    Venturini, Marco; Oide, Katsunobu

    2006-02-28

    In 2005 a global effort was initiated to conduct studies for a baseline recommendation for the various components of the International Linear Collider (ILC). Work for the damping rings was subdivided in a number of tasks. This Report contains the contribution to this effort by the Authors as Coordinators of the Task Force on space charge. (A slightly reduced version of this document can also be found as part of the ''Configuration Studies and Recommendations for the ILC Damping Rings'', Edts. A. Wolski, et al., LBNL-59449.) The studies documented in this Report were carried out for several of the reference lattices considered for the baseline recommendation. Space charge effects were found to be quite noticeable in the lattices with the longest circumference. Although it does not appear that they could prevent operation of any machine having such lattices they do favor a choice of a ring design with shorter ({approx}6km) circumference at 5 GeV.

  7. Scientists to Meet in Carlsbad, NM for Hard Rock Lab Task Force

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists From Nine Countries to Converge On Carlsbad for Technical Meeting CARLSBAD, N.M., February 7, 2000 - Scientists from nine countries will converge on this southeastern New Mexico city February 7-10 to share their views during the 13 th Äspö Hard Rock Laboratory Task Force Meeting on Modelling of Groundwater Flow and Transport of Solutes. "Carlsbad is quickly becoming recognized as the international center for repository technology," said Dr. Inés Triay, manager of the U.S.

  8. International PV QA Task Force's Proposed Comparative Rating System for PV Modules: Preprint

    SciTech Connect (OSTI)

    Wohlgemuth, J.; Kurtz, S.

    2014-10-01

    The International PV Quality Assurance Task Force is developing a rating system that provides comparative information about the relative durability of PV modules. Development of accelerated stress tests that can provide such comparative information is seen as a major step toward being able to predict PV module service life. This paper will provide details of the ongoing effort to determine the format of such an overall module rating system. The latest proposal is based on using three distinct climate zones as defined in IEC 60721-2-1 for two different mounting systems. Specific stresses beyond those used in the qualification tests are being developed for each of the selected climate zones.

  9. Wind Supply Curves and Location Scenarios in the West: Summary of the Clean and Diverse Energy Wind Task Force Report; Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Parsons, B.; Shimshak, R.; Larson, D.; Carr, T.

    2006-06-01

    This paper presents supply curves and scenarios that were developed by the Wind Task Force. Much of this information has been adapted from the original Wind Task Force report.

  10. Information Technology and Community Restoration Studies/Task 1: Information Technology

    SciTech Connect (OSTI)

    Upton, Jaki F.; Lesperance, Ann M.; Stein, Steven L.

    2009-11-19

    Executive Summary The Interagency Biological Restoration Demonstration—a program jointly funded by the Department of Defense's Defense Threat Reduction Agency and the Department of Homeland Security's (DHS's) Science and Technology Directorate—is developing policies, methods, plans, and applied technologies to restore large urban areas, critical infrastructures, and Department of Defense installations following the intentional release of a biological agent (anthrax) by terrorists. There is a perception that there should be a common system that can share information both vertically and horizontally amongst participating organizations as well as support analyses. A key question is: "How far away from this are we?" As part of this program, Pacific Northwest National Laboratory conducted research to identify the current information technology tools that would be used by organizations in the greater Seattle urban area in such a scenario, to define criteria for use in evaluating information technology tools, and to identify current gaps. Researchers interviewed 28 individuals representing 25 agencies in civilian and military organizations to identify the tools they currently use to capture data needed to support operations and decision making. The organizations can be grouped into five broad categories: defense (Department of Defense), environmental/ecological (Environmental Protection Agency/Ecology), public health and medical services, emergency management, and critical infrastructure. The types of information that would be communicated in a biological terrorism incident include critical infrastructure and resource status, safety and protection information, laboratory test results, and general emergency information. The most commonly used tools are WebEOC (web-enabled crisis information management systems with real-time information sharing), mass notification software, resource tracking software, and NW WARN (web-based information to protect critical infrastructure

  11. Installation-Restoration Program. Phase 2. Confirmation/quantification stage 1 for Minot Air Force Base, Minot, North Dakota. Volume 2. Appendices A through F. Final report, September 1985-October 1988

    SciTech Connect (OSTI)

    Not Available

    1988-10-01

    This document in the appendices A-F for the Installation-Restoration Program Report concerning Minot Air Force Base. The overall objective of the Installation Restoration Program (IRP) Phase II investigation is to assess potential contamination at past hazardous-waste-disposal and spill sites on Air Force installations. A series of stages field investigations may be required to meet this objective. The purpose of this task is to undertake a field investigation at Minot AFB ND to: (1) confirm the presence or absence of contamination within the specified areas of investigation: (2) if possible, determine the extent and degree of contamination and the potential for migration of those contaminants in various environmental media; (3) identify public health and environmental hazards of migrating pollutants based on State or Federal standards for those contaminants; and (4) delineate additional investigations required beyond this stage to reach the Phase II objectives.

  12. Health and safety plan for operations performed for the Environmental Restoration Program. Task, OU 1-03 and OU 4-10 Track 2 investigations

    SciTech Connect (OSTI)

    Trippet, W.A. II; Reneau, M.; Morton, S.L.

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  13. NACE Task Force T-1 F-24 report on SSC resistance of weldments

    SciTech Connect (OSTI)

    Vitale, D.D.

    1998-12-31

    This report summarizes the testing program of NACE Task Force T-1 F-24 addressing the sulfide stress cracking resistance (SSC) of weldments. Three alloys were welded, postweld heat treated (PWHT), and tested for resistance to sulfide stress cracking (SSC) The alloys tested included AISI 4130, 2 1/4 Cr-1Mo, and Type 410 stainless steel. Resistance to SSC was evaluated using NACE TM0177 procedure. Performance of welded specimens was compared to base metal samples. The welding and PWHT procedures used were similar to those successfully used in industry practice today. With the exception of a lower strength, normalized, 2 1/4 Cr-1Mo weldments, the SSC of weldments was less than that of the base metal.

  14. Carbon Issues Task Force Report for the Idaho Strategic Energy Alliance

    SciTech Connect (OSTI)

    Travis L. Mcling

    2010-10-01

    The Carbon Issues Task Force has the responsibility to evaluate emissions reduction and carbon offset credit options, geologic carbon sequestration and carbon capture, terrestrial carbon sequestration on forest lands, and terrestrial carbon sequestration on agricultural lands. They have worked diligently to identify ways in which Idaho can position itself to benefit from potential carbon-related federal legislation, including identifying opportunities for Idaho to engage in carbon sequestration efforts, barriers to development of these options, and ways in which these barriers can be overcome. These are the experts to which we will turn when faced with federal greenhouse gas-related legislation and how we should best react to protect and provide for Idaho’s interests. Note that the conclusions and recommended options in this report are not intended to be exhaustive, but rather form a starting point for an informed dialogue regarding the way-forward in developing Idaho energy resources.

  15. Report of the Interagency Task Force on Carbon Capture and Storage

    SciTech Connect (OSTI)

    2010-08-01

    Carbon capture and storage (CCS) refers to a set of technologies that can greatly reduce carbon dioxide (CO{sub 2}) emissions from new and existing coal- and gas-fired power plants, industrial processes, and other stationary sources of CO{sub 2}. In its application to electricity generation, CCS could play an important role in achieving national and global greenhouse gas (GHG) reduction goals. However, widespread cost-effective deployment of CCS will occur only if the technology is commercially available and a supportive national policy framework is in place. In keeping with that objective, on February 3, 2010, President Obama established an Interagency Task Force on Carbon Capture and Storage composed of 14 Executive Departments and Federal Agencies. The Task Force, co-chaired by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), was charged with proposing a plan to overcome the barriers to the widespread, cost-effective deployment of CCS within ten years, with a goal of bringing five to ten commercial demonstration projects online by 2016. Composed of more than 100 Federal employees, the Task Force examined challenges facing early CCS projects as well as factors that could inhibit widespread commercial deployment of CCS. In developing the findings and recommendations outlined in this report, the Task Force relied on published literature and individual input from more than 100 experts and stakeholders, as well as public comments submitted to the Task Force. The Task Force also held a large public meeting and several targeted stakeholder briefings. While CCS can be applied to a variety of stationary sources of CO{sub 2}, its application to coal-fired power plant emissions offers the greatest potential for GHG reductions. Coal has served as an important domestic source of reliable, affordable energy for decades, and the coal industry has provided stable and quality high-paying jobs for American workers. At the same time, coal-fired power

  16. Compilation of reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    This report contains reports prepared for the Secretary of Energy Advisory Board Task Force on Radioactive Waste Management, from experts in the United States. The contents of the report focus mainly on public opinion, and government policies as perceived by the public.

  17. Installation restoration program. Phase I. Records search. Niagara Falls Air Force Reserve facility, New York

    SciTech Connect (OSTI)

    Not Available

    1983-12-01

    The Department of Defense (DOD) has developed a program to identify and evaluate past hazardous material disposal sites on DOD property, to control the migration of hazardous contaminants, and to control hazards to health or welfare that may result from these past disposal operations. This program is called the Installation Restoration Program (IRP). The IRP has four phases consisting of Phase I, Initial Assessment/Records Search; Phase II, Confirmation and Quantification; Phase III, Technology Base Development; and Phase IV, Operations/Remedial Measures. Niagara Falls AFRF is located in Niagara County, New York, approximately six miles northeast of the City of Niagara Falls and approximately fifteen miles north of Buffalo. The installation is currently comprised of 985 acres with a base population of approximately 2,560. The following areas were determined to have a sufficient potential to create environmental contamination and follow-on investigation is warranted: Bldg. 600 JP-4 Pipeline Leak; POL JP-4 Tank C; Landfill; BX MOGAS Tank Leak; NYANG Hazardous Waste Drum Storage; POL JP-4 Tank A; JP-4 Tank Truck Spill; Bldg. 202 Drum Storage Yard; Fire Training Facility No. 1, 2 and 3; Bldg. 850 Drum Storage Yard; and AFRES Hazardous Waste Drum Storage.

  18. U.S. Transport Task Force Meeting - April 2014 Final Report

    SciTech Connect (OSTI)

    Tynan, George R.

    2014-09-19

    The ultimate goal of the U.S. Transport Task Force is to develop a physics-based understanding of confinement and particle, momentum and heat transport in magnetic fusion devices. This understanding should be of sufficient depth that it allows the development of predictive models of plasma transport that can be validated against experiment, and then used to anticipate the future performance of burning plasmas in ITER, as well as to provide guidance to the design of next-step fusion nuclear science facilities. To achieve success in transport science, it is essential to characterize local fluctuations and transport in toroidal plasmas, to understand the basic mechanisms responsible for transport, and ultimately to control these transport processes. These goals must be pursued in multiple areas, including ion and electron thermal transport, particle and momentum transport, the physics of H-modes and the edge pedestal, Internal Transport Barriers, energetic particle transport and 3D effects on all the underlying transport processes. Demonstrating our understanding requires multiple, successful, quantitative tests of theory, simulation and modeling using experimental results in fusion-relevant and basic plasmas (i.e., verification and validation). The 2014 U.S. TTF meeting was held in April 2014 in San Antonio TX to provide a forum for leading scientists focused on the study of transport of particles, momentum and heat in fusion plasmas. Approximately 110 scientists from the US and several from the EU and from China attended and heard oral talks on recent transport results. Several poster sessions were also held. One day of plenary talks were followed by Breakout sessions and poster sessions that were held on focused topics, including L-H transition physics, energetic particles, transport in high performance plasmas, divertor particle and heat flux management and innovative divertor designs, fundamental turbulence studies, end edge transport shortfall. Most of the

  19. Defense Waste Processing Facility: Report of task force on options to mitigate the effect of nitrite on DWPF operations

    SciTech Connect (OSTI)

    Randall, D.; Marek, J.C.

    1992-03-01

    The possibility of accumulating ammonium nitrate (an explosive) as well as organic compounds in the DWPF Chemical Processing Cell Vent System was recently discovered. A task force was therefore organized to examine ways to avoid this potential hazard. Of thirty-two processing/engineering options screened, the task force recommended five options, deemed to have the highest technical certainty, for detailed development and evaluation: Radiolysis of nitrite in the tetraphenylborate precipitate slurry feed in a new corrosion-resistant facility. Construction of a Late Washing Facility for precipitate washing before transfer to the DWPF; Just-in-Time'' precipitation; Startup Workaround by radiolysis of nitrite in the existing corrosion-resistant Pump Pit tanks; Ammonia venting and organics separation in the DWPF; and, Estimated costs and schedules are included in this report.

  20. SciFri PM: Topics 03: The Global Task Force on Radiotherapy for Cancer Control: Core Investments

    SciTech Connect (OSTI)

    Van Dyk, J.; Jaffray, D. A.; MacPherson, M. S.

    2014-08-15

    The Union for International Cancer Control (UICC) is a membership-based, non-governmental organization with a mandate to to unite the cancer community to reduce the global cancer burden, to promote greater equity, and to integrate cancer control into the world health and development agenda. COMP is an associate member of the UICC. It is well recognized by the UICC that there are major gaps between high, and low and middle income countries, in terms of access to cancer services including access to radiation therapy. In this context, the UICC has developed a Global Task Force on Radiotherapy for Cancer Control with a charge to answer a single question: What does it cost to close the gap between what exists today and reasonable access to radiotherapy globally? The Task Force consists of leaders internationally recognized for their radiation treatment related expertise (radiation oncologists, medical physicists, radiation therapists) as well as those with global health and economics specialization. The Task Force has developed three working groups: (1) to look at the global burden of cancer; (2) to look at the infrastructure requirements (facilities, equipment, personnel); and (3) to consider outcomes in terms of numbers of lives saved and palliated patients. A report is due at the World Cancer Congress in December 2014. This presentation reviews the infrastructure considerations under analysis by the second work group. The infrastructure parameters being addressed include capital costs of buildings and equipment and operating costs, which include human resources, equipment servicing and quality control, and general overhead.

  1. NRC Fact-Finding Task Force report on the ATWS event at Salem Nuclear Generating Station, Unit 1, on February 25, 1983

    SciTech Connect (OSTI)

    Not Available

    1983-03-01

    An NRC Region I Task Force was established on March 1, 1983 to conduct fact finding and data collection with regard to the circumstances which led to an anticipated transient without scram (ATWS) event at the Public Service Electric and Gas Company's Salem Generating Station, Unit 1 on February 25, 1983. The charter of the Task Force was to determine the factual information pertinent to management and administrative controls which should have ensured proper operation of the reactor trip breakers in the solid state protection system. This report documents the findings of the Task Force along with its conclusions.

  2. Beryllium Health and Safety Committee Data Reporting Task Force White Paper #2 -- Uses of Uncensored Data

    SciTech Connect (OSTI)

    MacQueen, D H

    2007-10-10

    statistical comparisons described in the TS could be better implemented if analytical results, even when below a reporting limit, were to be reported by analytical laboratories. See Appendix 1 for a review of terminology related to reporting limits. The Beryllium Health and Safety Committee (BHSC) formed a Sampling and Analysis Subcommittee (SAS) in 2003. The SAS established a working group on accreditation and reporting limits. By 2006 it had become evident that the issues extended to data reporting as a whole. The SAS proposed to the BHSC the formation of a Data Reporting Task Force (DRTF) to consider issues related to data reporting. The BHSC Board agreed, and requested that the DRTF generate a white paper, to be offered by the BHSC to potential interested parties such as the DOE policy office that is responsible for beryllium health and safety policy. It was noted that additional products could include detailed guidance and potentially a journal article in the future. The SAS proposed that DRTF membership represent the affected disciplines (chemists, industrial hygiene professionals and statisticians, and the DOE office that is responsible for beryllium health and safety policy). The BHSC Board decided that DRTF membership should come from DOE sites, since the focus would be on reporting in the context of the TS and the Rule. The DRTF came into existence in late 2006. The DRTF membership includes industrial hygienists, analytical chemists and laboratory managers, members of the regulatory and oversight community, and environmental statisticians. A first White Paper, ''Summary of Issues and Path Forward'', was reviewed by the BHSC in March 2007 and issued by the DRTF in June 2007. It describes the charter of the DRTF, introduces some basic terminology (reproduced here in Appendix 1), lays out the issues the DRTF is expected to address, and describes a path forward for the DRTF's work. This first White Paper is available through the BHSC web site. This White Paper presents

  3. Hydropower Vision: Task Force Charter V2 06/09/2014 U.S. Department of Energy Wind and Water Power Technologies Office - Hydropower Vision Project 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydropower Vision: Task Force Charter V2 06/09/2014 U.S. Department of Energy Wind and Water Power Technologies Office - Hydropower Vision Project 1 Hydropower Vision: Task Force Charter Hydropower Vision Defined The U.S. Department of Energy (DOE) Wind and Water Power Technologies Office is looking toward the future of the hydropower community in developing a long-range national Hydropower Vision in close coordination with industry, agencies, and stakeholders. This landmark vision will

  4. Development of residential-conservation-survey methodology for the US Air Force. Interim report. Task two

    SciTech Connect (OSTI)

    Abrams, D. W.; Hartman, T. L.; Lau, A. S.

    1981-11-13

    A US Air Force (USAF) Residential Energy Conservation Methodology was developed to compare USAF needs and available data to the procedures of the Residential Conservation Service (RCS) program as developed for general use by utility companies serving civilian customers. Attention was given to the data implications related to group housing, climatic data requirements, life-cycle cost analysis, energy saving modifications beyond those covered by RCS, and methods for utilizing existing energy consumption data in approaching the USAF survey program. Detailed information and summaries are given on the five subtasks of the program. Energy conservation alternatives are listed and the basic analysis techniques to be used in evaluating their thermal performane are described. (MCW)

  5. Status Report on Activities of the Systems Assessment Task Force, OECD-NEA Expert Group on Accident Tolerant Fuels for LWRs

    SciTech Connect (OSTI)

    Bragg-Sitton, Shannon Michelle

    2015-09-01

    The Organization for Economic Cooperation and Development /Nuclear Energy Agency (OECD/NEA) Nuclear Science Committee approved the formation of an Expert Group on Accident Tolerant Fuel (ATF) for LWRs (EGATFL) in 2014. Chaired by Kemal Pasamehmetoglu, INL Associate Laboratory Director for Nuclear Science and Technology, the mandate for the EGATFL defines work under three task forces: (1) Systems Assessment, (2) Cladding and Core Materials, and (3) Fuel Concepts. Scope for the Systems Assessment task force includes definition of evaluation metrics for ATF, technology readiness level definition, definition of illustrative scenarios for ATF evaluation, parametric studies, and selection of system codes. The Cladding and Core Materials and Fuel Concepts task forces will identify gaps and needs for modeling and experimental demonstration; define key properties of interest; identify the data necessary to perform concept evaluation under normal conditions and illustrative scenarios; identify available infrastructure (internationally) to support experimental needs; and make recommendations on priorities. Where possible, considering proprietary and other export restrictions (e.g., International Traffic in Arms Regulations), the Expert Group will facilitate the sharing of data and lessons learned across the international group membership. The Systems Assessment Task Force is chaired by Shannon Bragg-Sitton (INL), while the Cladding Task Force will be chaired by a representative from France (Marie Moatti, Electricite de France [EdF]) and the Fuels Task Force will be chaired by a representative from Japan (Masaki Kurata, Japan Atomic Energy Agency [JAEA]). This report provides an overview of the Systems Assessment Task Force charter and status of work accomplishment.

  6. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    SciTech Connect (OSTI)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG&G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  7. Health and Safety Plan for Operations Performed for the Environmental Restoration Program: Task, Characterization of Potential Waste Sources at Auxiliary Reactor Area-1 Operable Unit 5--07 site ARA-02

    SciTech Connect (OSTI)

    Pickett, S.L.; Morton, S.L.

    1992-06-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the ERP. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  8. Sustainable energy for all. Technical report of task force 1 in support of the objective to achieve universal access to modern energy services by 2030

    SciTech Connect (OSTI)

    Birol, Fatih

    2012-04-15

    The UN Secretary General established the Sustainable Energy for All initiative in order to guide and support efforts to achieve universal access to modern energy, rapidly increase energy efficiency, and expand the use of renewable energies. Task forces were formed involving prominent energy leaders and experts from business, government, academia and civil society worldwide. The goal of the Task Forces is to inform the implementation of the initiative by identifying challenges and opportunities for achieving its objectives. This report contains the findings of Task Force One which is dedicated to the objective of achieving universal access to modern energy services by 2030. The report shows that universal energy access can be realized by 2030 with strong, focused actions set within a coordinated framework.

  9. ATLAS Metadata Task Force

    SciTech Connect (OSTI)

    ATLAS Collaboration; Costanzo, D.; Cranshaw, J.; Gadomski, S.; Jezequel, S.; Klimentov, A.; Lehmann Miotto, G.; Malon, D.; Mornacchi, G.; Nemethy, P.; Pauly, T.; von der Schmitt, H.; Barberis, D.; Gianotti, F.; Hinchliffe, I.; Mapelli, L.; Quarrie, D.; Stapnes, S.

    2007-04-04

    This document provides an overview of the metadata, which are needed to characterizeATLAS event data at different levels (a complete run, data streams within a run, luminosity blocks within a run, individual events).

  10. Urban energy management today: Ten year compendium of UCETF programs. Products and expertise of the Urban Consortium Energy Task Force, 1979--1989

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The reports listed in this Overview summarize projects conducted through the Urban Consortium Energy Task Force by local government staff who have defined and implemented many of the energy strategies described above. Reports from their projects illustrate effective approaches to plan and implement these strategies, as well as software tools, surveys, and technical instruments valuable to other local government officials conducting similar projects.

  11. Source evaluation report phase 2 investigation: Limited field investigation. Final report: United States Air Force Environmental Restoration Program, Eielson Air Force Base, Alaska

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This report describes the limited field investigation work done to address issues and answer unresolved questions regarding a collection of potential contaminant sources at Eielson Air Force Base (AFB), near Fairbanks, Alaska. These sources were listed in the Eielson AFB Federal Facility Agreement supporting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of the base. The limited field investigation began in 1993 to resolve all remaining technical issues and provide the data and analysis required to evaluate the environmental hazard associated with these sites. The objective of the limited field investigation was to allow the remedial project managers to sort each site into one of three categories: requiring remedial investigation/feasibility study, requiring interim removal action, or requiring no further remedial action.

  12. Defense Waste Processing Facility: Report of task force on options to mitigate the effect of nitrite on DWPF operations. Savannah River Site 200-S Area

    SciTech Connect (OSTI)

    Randall, D.; Marek, J.C.

    1992-03-01

    The possibility of accumulating ammonium nitrate (an explosive) as well as organic compounds in the DWPF Chemical Processing Cell Vent System was recently discovered. A task force was therefore organized to examine ways to avoid this potential hazard. Of thirty-two processing/engineering options screened, the task force recommended five options, deemed to have the highest technical certainty, for detailed development and evaluation: Radiolysis of nitrite in the tetraphenylborate precipitate slurry feed in a new corrosion-resistant facility. Construction of a Late Washing Facility for precipitate washing before transfer to the DWPF; ``Just-in-Time`` precipitation; Startup Workaround by radiolysis of nitrite in the existing corrosion-resistant Pump Pit tanks; Ammonia venting and organics separation in the DWPF; and, Estimated costs and schedules are included in this report.

  13. Interim report of the interagency coal export task force: draft for public comment. [Trade by country 1960-1979; general forecasting to 1985, 1990 and 2000

    SciTech Connect (OSTI)

    1981-01-01

    The Interagency Coal Export Task Force was formed in the Spring of 1980 at the direction of the President, in support of the international efforts of the United States, encouraging the use of coal. Its purpose was to report on possible courses of action to increase United States steam coal exports in a manner consistent with other national policies, including our commitment to environmental protection. The Task Force assembled existing data, developed significant new information regarding the international coal market and undertook analyses of apparent problems underlying coal exports. The Task Force contributed to a public awareness of the fact that increased coal exports will serve both the domestic and international interests of the United States. Based upon extensive, independent field studies in Europe and the Far East, the Task Force concludes that there will be significant growth in world demand for steam coal. Such growth has already begun, has contributed to the almost seven-fold increase in United States overseas steam coal exports for 1990 over 1979, and is expected to continue beyond the end of this century. The growth in world steam coal trade projected in the report does not guarantee United States coal exporters a large or expanding share of the market. The United States' role depends on the buying strategies of the consuming countries, the policies and prices of competing exporters, and the actions taken by the United States to maintain reasonable prices, prompt delivery and dependable quality. Projections of United States steam coal exports, therefore, rest upon a number of highly uncertain factors which are discussed in some detail.

  14. Oak Ridge Reservation volume I. Y-12 mercury task force files: A guide to record series of the Department of Energy and its contractors

    SciTech Connect (OSTI)

    1995-02-17

    The purpose of this guide is to describe each of the series of records identified in the documents of the Y-12 Mercury Task Force Files that pertain to the use of mercury in the separation and enrichment of lithium isotopes at the Department of Energy`s (DOE) Y-12 Plant in Oak Ridge, Tennessee. History Associates Incorporated (HAI) prepared this guide as part of DOE`s Epidemiologic Records Inventory Project, which seeks to verify and conduct inventories of epidemiologic and health-related records at various DOE and DOE contractor sites. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project. Specific attention will be given to the history of the DOE-Oak Ridge Reservation, the development of the Y-12 Plant, and the use of mercury in the production of nuclear weapons during the 1950s and early 1960s. This introduction provides background information on the Y-12 Mercury Task Force Files, an assembly of documents resulting from the 1983 investigation of the Mercury Task Force into the effects of mercury toxicity upon workplace hygiene and worker health, the unaccountable loss of mercury, and the impact of those losses upon the environment. This introduction also explains the methodology used in the selection and inventory of these record series. Other topics include the methodology used to produce this guide, the arrangement of the detailed record series descriptions, and information concerning access to the collection.

  15. Installation-Restoration Program. Phase 2. Confirmation/quantification, Stage 2 for Seymour Johnson Air Force Base, North Carolina. Volume 1. Final report, July 1986-November 1988

    SciTech Connect (OSTI)

    Alexander, W.J.; Winters, S.L.; Guthrie, S.A.

    1988-11-01

    A Phase II, Stage 2 survey has been conducted at the Seymour Johnson Air Force Base under the Department of Defense's Installation Restoration Program (IRP). Six sites were identified by the Air Force for further study and include: Fire Training Area No. 3 (Site 1); Landfill No. 4 (Site 2); Landfill No. 1 (Site 3); Landfill No. 3 (Site 4); DPDO Waste Storage Area (Site 5); and Coal Pile Storage Area (Site 6). The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of new monitoring wells, resampling of selected Stage 1 monitoring wells, and the analysis of soil and water samples. A thin surficial aquifer was encountered at shallow depths beneath the sites that border the southeastern side of Stoney Creek. The surficial aquifer is contaminated at Sites 1, 2, 4, and 5 as a result of Base activities. Ground-water flow in the surficial aquifer is primarily horizontal and discharges into Stoney Creek along the northwestern limit of the Base. The major environmental concern revealed by this evaluation is the potential discharge of contaminated water from the surficial aquifer into Stoney Creek.

  16. Activities of the Oil Implementation Task Force, December 1990--February 1991; Contracts for field projects and supporting research on enhanced oil recovery, April--June 1990

    SciTech Connect (OSTI)

    Tiedemann, H.A. )

    1991-03-01

    The Oil Implementation Task Force was appointed to implement the US DOE's new oil research program directed toward increasing domestic oil production by expanded research on near- or mid-term enhanced oil recovery methods. An added priority is to preserve access to reservoirs that have the largest potential for oil recovery, but that are threatened by the large number of wells abandoned each year. This report describes the progress of research activities in the following areas: chemical flooding; gas displacement; thermal recovery; resource assessment; microbial technology; geoscience technology; and environmental technology. (CK)

  17. Activities of the Oil Implementation Task Force; Contracts for field projects and supporting research on enhanced oil recovery, July--September 1990

    SciTech Connect (OSTI)

    Tiedemann, H.A. )

    1991-05-01

    The report contains a general introduction and background to DOE's revised National Energy Strategy Advanced Oil Recovery Program and activities of the Oil Implementation Task Force; a detailed synopsis of the symposium, including technical presentations, comments and suggestions; a section of technical information on deltaic reservoirs; and appendices containing a comprehensive listing of references keyed to general deltaic and geological aspects of reservoirs and those relevant to six selected deltaic plays. Enhanced recovery processes include chemical floodings, gas displacement, thermal recovery, geoscience, and microbial recovery.

  18. Sustainable energy for all. Technical report of task force 2 in support of doubling the global rate of energy efficiency improvement and doubling the share of renewable energy in the global energy mix by 2030

    SciTech Connect (OSTI)

    Nakicenovic, Nebojsa; Kammen, Daniel; Jewell, Jessica

    2012-04-15

    The UN Secretary General established the Sustainable Energy for All initiative in order to guide and support efforts to achieve universal access to modern energy, rapidly increase energy efficiency, and expand the use of renewable energies. Task forces were formed involving prominent energy leaders and experts from business, government, academia and civil society worldwide. The goal of the Task Forces is to inform the implementation of the initiative by identifying challenges and opportunities for achieving its objectives. This report contains the findings of Task Force Two which is dedicated energy efficiency and renewable energy objectives. The report shows that doubling the rate of energy efficiency improvements and doubling the share of energy from renewable sources by 2030 is challenging but feasible if sufficient actions are implemented. Strong and well-informed government policies as well as extensive private investment should focus on the high impact areas identified by the task force.

  19. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    SciTech Connect (OSTI)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.

  20. [Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 3, Sampling and analysis plan (SAP): Phase 1, Task 4, Field Investigation: Draft

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    In April 1990, Wright-Patterson Air Force Base (WPAFB), initiated an investigation to evaluate a potential Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action to prevent, to the extent practicable, the offsite migration of contaminated ground water from WPAFB. WPAFB retained the services of the Environmental Management Operations (EMO) and its principle subcontractor, International Technology Corporation (IT) to complete Phase 1 of the environmental investigation of ground-water contamination at WPAFB. Phase 1 of the investigation involves the short-term evaluation and potential design for a program to remove ground-water contamination that appears to be migrating across the western boundary of Area C, and across the northern boundary of Area B along Springfield Pike. Primarily, Task 4 of Phase 1 focuses on collection of information at the Area C and Springfield Pike boundaries of WPAFB. This Sampling and Analysis Plan (SAP) has been prepared to assist in completion of the Task 4 field investigation and is comprised of the Quality Assurance Project Plan (QAPP) and the Field Sampling Plan (FSP).

  1. Task force cover.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Conduct early risk studiesrun analyses and get independent review. Use holistic approach to establish criteria and end states prior to starting work. (Look at whole picture, not ...

  2. Biofuels Task Force.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Brian Hazen-Manager, Advanced Technologies & Alternative ... import volumes, Flex-Fuel Vehicle (FFV) production, and ... Figure 4 shows recent trends in rail shipments of ethanol ...

  3. SEAB Subcommittees and Task Forces

    Office of Energy Efficiency and Renewable Energy (EERE)

    SEAB has four standing subcommittees that provide advice and recommendations to the Secretary on the Department's four major mission areas: science; energy; nuclear security; and environmental...

  4. [Environmental investigation of ground water contamination at Wright-Patterson Air Force Base, Ohio]. Volume 2, Work plan: Phase 1, Task 4, Field Investigation: Draft

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    In April 1990 Wright-Patterson Air Force Base (WPAFB) initiated an investigation to evaluate a potential CERCLA removal action to prevent, to the extent practicable, the migration of ground-water contamination in the Mad River Valley Aquifer within and across WPAFB boundaries. The action will be based on a Focused Feasibility Study with an Action Memorandum serving as a decision document that is subject to approval by the Ohio Environmental Protection Agency. The first phase (Phase 1) of this effort involves an investigation of ground-water contamination migrating across the southwest boundary of Area C and across Springfield Pike adjacent to Area B. Task 4 of Phase 1 is a field investigation to collect sufficient additional information to evaluate removal alternatives. The field investigation will provide information in the following specific areas of study: water-level data which will be used to permit calibration of the ground-water flow model to a unique time in history; and ground-water quality data which will be used to characterize the current chemical conditions of ground water.

  5. Activities of the Oil Implementation Task Force, reporting period March--August 1991; Contracts for field projects and supporting research on enhanced oil recovery, reporting period October--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    Activities of DOE's Oil Implementation Task Force for the period March--August 1991 are reviewed. Contracts for fields projects and supporting research on enhanced oil recovery are discussed, with a list of related publications given. Enhanced recovery processes covered include chemical flooding, gas displacement, thermal recovery, and microbial recovery.

  6. Installation-Restoration Program. Phase 2. Confirmation quantification. Stage 2 for MacDill Air Force Base, Florida. Volume 1. Final report, June 1986-July 1988

    SciTech Connect (OSTI)

    Not Available

    1988-07-22

    An Installation-Restoration Program (IRP) Phase II, Stage 2 investigation was conducted at MacDill AFB and Avon Park AFR, Florida, to confirm the presence or absence of contamination at twelve sites. Eight of the twelve sites were previously investigated under Phase II, Stage I efforts. Four sites had not previously been investigated under Phase II efforts. A field program was conducted, consisting of geophysical surveys, the drilling and installation of 28 monitoring wells, an aquifer pumping test in the surficial aquifer, and the collection and analysis of ground water, surface water, and sediment samples. At MacDill AFB, no significant contaminants were found at two of the sites. These sites were recommended for no further action. At three other sites no significant contamination was found but other evidence suggested that additional study should be considered before specific action at these sites is recommended. Significant contamination was found at three sites and these sites were recommended for additional investigation. One site at MacDill AFB was recommended for remedial action. At Avon Park AFR, all three sites showed no significant contamination and were recommended for no further action.

  7. Installation-Restoration Program. Phase 2. Confirmation quantification. Stage 2 for MacDill Air Force Base, Florida. Volume 2. Final report, June 1986-July 1988

    SciTech Connect (OSTI)

    Not Available

    1988-07-22

    An Installation-Restoration Program (IRP) Phase II, Stage 2 investigation was conducted at MacDill AFB and Avon Park AFR, Florida, to confirm the presence or absence of contamination at twelve sites. Eight of the twelve sites were previously investigated under Phase II, Stage 1 efforts. Four sites had not previously been investigated under Phase II efforts. A field program was conducted, consisting of geophysical surveys, the drilling and installation of 28 monitoring wells, an aquifer pumping test in the surficial aquifer, and the collection and analysis of ground water, surface water, and sediment samples. At MacDill AFB, no significant contaminants were found at two of the sites. These sites were recommended for no further action. At three other sites no significant contamination was found but other evidence suggested that additional study should be considered before specific action at these sites is recommended. Significant contamination was found at three sites and these sites were recommended for additional investigation. One site at MacDill AFB was recommended for remedial action. At Avon Park AFR, all three sites showed no significant contamination and were recommended for no further action.

  8. Task Cover

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SOLICITATION NO. DE-SOL-0003641 Exhibit G The following item(s) are contained in this file: ITEM NAME NO. OF PAGES(S) Sample Task Order 1 Site Support Services 14 Sample Task Order 2 Health Program Services 16 Sample Task Order 3 Janitorial Services (including Child 30 Care Center Cleaning Standards) Task Order Transition 4 DE-SOL-0003641 Sample Task Order 1 (including Exhibit I) SAMPLE TASK ORDER 1 SITE OPERATIONS SUPPORT TASK ORDER REQUEST INFORMATION: a) Task Order Period of Performance -

  9. TASK ORDER

    National Nuclear Security Administration (NNSA)

    NA0000XXX Task Order No: DE-DT000XXXX Statement of Work August 7, 2015 Task Order Title: Design, Integration, Construction, Communications, and Engineering (DICCE) Services for Port of Cat Lai, Vietnam. Scope: The Contractor shall design, construct, and integrate fully functional portal monitor and communications systems at designated sites in Vietnam. * Port of Cat Lai Requirements Documents: The following task order requirements describe key milestones and deliverables. For a more complete

  10. Task Cover

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The task involves 1) occupational medicine; 2) Wellness; 3) Ergonomics; 4) Industrial Hygiene; 5) Personal Exposure and Workplace Monitoring; 6) Ventilation Program; 7) Radiation; ...

  11. DOE Awards Contract to Restoration Services, Inc. for Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Services at Portsmouth Site | Department of Energy Contract to Restoration Services, Inc. for Environmental Technical Services at Portsmouth Site DOE Awards Contract to Restoration Services, Inc. for Environmental Technical Services at Portsmouth Site June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Restoration Services, Inc. (RSI), has been awarded a task order for environmental technical services supporting the remediation

  12. Climate Change Task Force Webinar Series

    Broader source: Energy.gov [DOE]

    The four-part Climate Change Impacts and Indian Country webinar series provided tribal leaders an opportunity to share their insights, experiences, and ideas with President Obamas State, Local,...

  13. Task force appendix cover.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... * Central Plateau in context with the rest of the world * What about flooding ... Central Plateau as storage so that the rest of Hanford can be safe * Treaty rights - ...

  14. Task Force Approach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Breaking Down Stovepipes: This includes activities such as our coordination with other DOE wide teams such as the NEPA six sigma team and the Facilities and Infrastructure Steering ...

  15. Report of the Hubs+ Task Force

    Broader source: Energy.gov [DOE]

    SEAB findings and recommendations related to the management and early progress of these new management and funding mechanisms in the Department.

  16. NM Renewable Energy Storage Task Force

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering ...

  17. Task Group 9 Update (Presentation)

    SciTech Connect (OSTI)

    Bosco, N.

    2014-04-01

    This presentation is a brief update of IEC TC82 QA Task Force, Group 9. Presented is an outline of the recently submitted New Work Item Proposal (NWIP) for a Comparative Thermal Cycling Test for CPV Modules to Differentiate Thermal Fatigue Durability.

  18. Small Business Issues for Environmental Restoration Acquisitions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions ...

  19. Restore: Modeling Repair and Restoration Processes | Argonne National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Restore: Modeling Repair and Restoration Processes Restore: Modeling Repair and Restoration Processes Argonne's Restore software models complex sets of steps required to accomplish a goal, such as repairing a ruptured natural gas pipeline, when the time required to complete a step may be uncertain. For example, external conditions (i.e., the time of day, weather, and availability of crew) may affect one or more of the steps required to accomplish a goal. Therefore,

  20. protective force

    National Nuclear Security Administration (NNSA)

    ntex%20-%20protective%20force%20-%20edited.jpg" alt"successfully completed a recent assessment by the U.S. Department " >

    Members of Pantex's Protective Force on...

  1. Columbia Estuary Ecosystem Restoration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Columbia Estuary Ecosystem Restoration Program Finding of No Significant Impact page 1 Columbia Estuary Ecosystem Restoration Program Finding of No Significant Impact Bonneville Power Administration DOE/EA-2006 July 2016 SUMMARY Bonneville Power Administration (BPA) announces its environmental findings for the Columbia Estuary Ecosystem Restoration Program. The ongoing program, implemented by BPA and United States Army Corps of Engineers (Corps), involves activities and projects to restore

  2. Adaptive wiener image restoration kernel

    DOE Patents [OSTI]

    Yuan, Ding

    2007-06-05

    A method and device for restoration of electro-optical image data using an adaptive Wiener filter begins with constructing imaging system Optical Transfer Function, and the Fourier Transformations of the noise and the image. A spatial representation of the imaged object is restored by spatial convolution of the image using a Wiener restoration kernel.

  3. Engineering approaches to ecosystem restoration

    SciTech Connect (OSTI)

    Hayes, D.F.

    1998-07-01

    This proceedings CD ROM contains 127 papers on developing and evaluating engineering approaches to wetlands and river restoration. The latest engineering developments are discussed, providing valuable insights to successful approaches for river restoration, wetlands restoration, watershed management, and constructed wetlands for stormwater and wastewater treatment. Potential solutions to a wide variety of ecosystem concerns in urban, suburban, and coastal environments are presented.

  4. Hurricane Response and Restoration

    Broader source: Energy.gov [DOE]

    Despite all of ISER’s efforts to promote reliability and resiliency in the energy sector, domestic and global events will occur that will disrupt the sector and ISER must always be prepared to respond. In the face of both manmade and natural disasters, ISER applies cutting edge technical solutions and emergency management expertise to help overcome challenges inherent in quickly restoring an incredibly complex U.S. energy system.

  5. TaskFarmer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TaskFarmer TaskFarmer TaskFarmer is a utility developed in-house at NERSC to farm tasks onto a compute node - these can be single- or multi-core tasks. It tracks which tasks have completed successfully, and allows straightforward re-submission of failed or un-run jobs from a task list. The base functionality is contained within the runcommands.sh script which is provided by Taskfarmer. The script will be added to your path after loading the Taskfarmer module. This script launches a server on the

  6. OOTW Force Design Tools

    SciTech Connect (OSTI)

    Bell, R.E.; Hartley, D.S.III; Packard, S.L.

    1999-05-01

    This report documents refined requirements for tools to aid the process of force design in Operations Other Than War (OOTWs). It recommends actions for the creation of one tool and work on other tools relating to mission planning. It also identifies the governmental agencies and commands with interests in each tool, from whom should come the user advisory groups overseeing the respective tool development activities. The understanding of OOTWs and their analytical support requirements has matured to the point where action can be taken in three areas: force design, collaborative analysis, and impact analysis. While the nature of the action and the length of time before complete results can be expected depends on the area, in each case the action should begin immediately. Force design for OOTWs is not a technically difficult process. Like force design for combat operations, it is a process of matching the capabilities of forces against the specified and implied tasks of the operation, considering the constraints of logistics, transport and force availabilities. However, there is a critical difference that restricts the usefulness of combat force design tools for OOTWs: the combat tools are built to infer non-combat capability requirements from combat capability requirements and cannot reverse the direction of the inference, as is required for OOTWs. Recently, OOTWs have played a larger role in force assessment, system effectiveness and tradeoff analysis, and concept and doctrine development and analysis. In the first Quadrennial Defense Review (QDR), each of the Services created its own OOTW force design tool. Unfortunately, the tools address different parts of the problem and do not coordinate the use of competing capabilities. These tools satisfied the immediate requirements of the QDR, but do not provide a long-term cost-effective solution.

  7. air force

    National Nuclear Security Administration (NNSA)

    en NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range http:nnsa.energy.govmediaroompressreleases...

  8. Hangman Restoration Project : Annual Report, August 1, 2001 - July 31, 2002.

    SciTech Connect (OSTI)

    Green, Gerald I.; Coeur D'Alene Tribe.

    2002-06-01

    The construction of hydroelectric facilities in the Columbia Basin resulted in the extirpation of anadromous fish stocks in Hangman Creek and its tributaries within the Coeur d'Alene Reservation. Thus, the Coeur d'Alene Indian Tribe was forced to rely more heavily on native fish stocks such as redband trout (Oncorhynchus mykiss garideini), westslope cutthroat trout (O. clarki lewisii) and bull trout (Salvelinus confluentus) as well as local wildlife populations. Additionally, the Tribe was forced to convert prime riparian habitat into agricultural lands to supply sustenance for their changed needs. Wildlife habitats within the portion of the Hangman Creek Watershed that lies within the Coeur d'Alene Indian Reservation have been degraded from a century of land management practices that include widespread conversion of native habitats to agricultural production and intensive silvicultural practices. Currently, wildlife and fish populations have been marginalized and water quality is significantly impaired. In the fall of 2000 the Coeur d'Alene Tribe Wildlife Program, in coordination with the Tribal Fisheries Program, submitted a proposal to begin addressing the degradations to functioning habitats within the Coeur d'Alene Reservation in the Hangman Watershed. That proposal led to the implementation of this project during BPA's FY2001 through FY2003 funding cycle. The project is intended to protect, restore and/or enhance priority riparian, wetland and upland areas within the headwaters of Hangman Creek and its tributaries in order to promote healthy self-sustaining fish and wildlife populations. A key goal of this project is the implementation of wildlife habitat protection efforts in a manner that also secures areas with the potential to provide stream and wetland habitats essential to native salmonid populations. This goal is critical in our efforts to address both resident fish and wildlife habitat needs in the Hangman Watershed. All proposed implementation

  9. Task Time Tracker

    Energy Science and Technology Software Center (OSTI)

    2013-07-24

    This client-side web app tracks the amount of time spent on arbitrary tasks. It allosw the creation of an unlimited number of arbitrarily named tasks ans via simple interactions, tracks the amount of time spent working on the drfined tasks.

  10. Force sensor

    DOE Patents [OSTI]

    Grahn, A.R.

    1993-05-11

    A force sensor and related method for determining force components is described. The force sensor includes a deformable medium having a contact surface against which a force can be applied, a signal generator for generating signals that travel through the deformable medium to the contact surface, a signal receptor for receiving the signal reflected from the contact surface, a generation controller, a reception controller, and a force determination apparatus. The signal generator has one or more signal generation regions for generating the signals. The generation controller selects and activates the signal generation regions. The signal receptor has one or more signal reception regions for receiving signals and for generating detections signals in response thereto. The reception controller selects signal reception regions and detects the detection signals. The force determination apparatus measures signal transit time by timing activation and detection and, optionally, determines force components for selected cross-field intersections. The timer which times by activation and detection can be any means for measuring signal transit time. A cross-field intersection is defined by the overlap of a signal generation region and a signal reception region.

  11. Force sensor

    DOE Patents [OSTI]

    Grahn, Allen R.

    1993-01-01

    A force sensor and related method for determining force components. The force sensor includes a deformable medium having a contact surface against which a force can be applied, a signal generator for generating signals that travel through the deformable medium to the contact surface, a signal receptor for receiving the signal reflected from the contact surface, a generation controller, a reception controller, and a force determination apparatus. The signal generator has one or more signal generation regions for generating the signals. The generation controller selects and activates the signal generation regions. The signal receptor has one or more signal reception regions for receiving signals and for generating detections signals in response thereto. The reception controller selects signal reception regions and detects the detection signals. The force determination apparatus measures signal transit time by timing activation and detection and, optionally, determines force components for selected cross-field intersections. The timer which times by activation and detection can be any means for measuring signal transit time. A cross-field intersection is defined by the overlap of a signal generation region and a signal reception region.

  12. Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes requirements for management and operation of the DOE Protective Force (PF), establishes requirements for firearms operations and defines the firearms courses of fire. Cancels: DOE M 473.2-1A DOE M 473.2-2

  13. Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-07

    The manual establishes requirements for management and operation of the DOE Protective Force, establishes requirements for firearms operations and defines the firearms courses of fire. Chg 1 dated 3/7/06. DOE M 470.4-3A cancels DOE M 470.4-3, Chg 1, Protective Force, dated 3-7-06, Attachment 2, Contractor Requirement Document (CRD) only (except for Section C). Chg 1, dated 3-7-06, cancels DOE M 470.4-3

  14. Environmental Restoration Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Restoration Strategic Plan Environmental Restoration Strategic Plan Environmental Restoration Strategic Plan, remediating the Nuclear Weapons Complex, August 1995, environmental_restoration_strategic_plan.pdf Environmental Restoration Strategic Plan (1.46 MB) More Documents & Publications FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 Audit Report: IG-0528 Office of Information Resources (MA-90)

  15. The cost of wetland creation and restoration. Final report

    SciTech Connect (OSTI)

    King, D.; Bohlen, C.

    1995-08-01

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  16. Basic research for environmental restoration

    SciTech Connect (OSTI)

    Not Available

    1990-12-01

    The Department of Energy (DOE) is in the midst of a major environmental restoration effort to reduce the health and environmental risks resulting from past waste management and disposal practices at DOE sites. This report describes research needs in environmental restoration and complements a previously published document, DOE/ER-0419, Evaluation of Mid-to-Long Term Basic Research for Environmental Restoration. Basic research needs have been grouped into five major categories patterned after those identified in DOE/ER-0419: (1) environmental transport and transformations; (2) advanced sampling, characterization, and monitoring methods; (3) new remediation technologies; (4) performance assessment; and (5) health and environmental effects. In addition to basic research, this document deals with education and training needs for environmental restoration. 2 figs., 6 tabs.

  17. Department of Energy Establishes Asset Revitalization Task Force...

    Office of Environmental Management (EM)

    nonprofits, tribal governments, the private sector and other stakeholders to identify ... nonprofits, tribal governments, the private sector and other stakeholders to leverage ...

  18. White House Climate Task Force Tribal Leaders Listening Session

    Broader source: Energy.gov [DOE]

    On Wednesday, February 12, Karen Diver, Chairwoman of the Fond du Lac Band of Lake Superior Chippewa, and Reggie Joule, Mayor of Alaska’s Northwest Arctic Borough, both of whom are members of...

  19. Report of the task force on SSC commissioning and operations

    SciTech Connect (OSTI)

    1985-07-01

    In 1985 January a Taskforce was organized to study the impact of magnet design on the commissioning and operation of the SSC. The results of the study, in the form of this report, are intended as one of several sources of input for the Magnet Type Selection Committee. Other major input will come from the Magnet Taskforce, the Test String Taskforce, the Cost Estimating Taskforce, and other study groups. All of these efforts will culminate in a magnet type selection, after which concentrated R&D on the selected magnet can commence. The study began with a one-week workshop, held on the UC Berkeley campus in 1985 January 14--18. An interim report of the Taskforce, based on the results of the Workshop, was published on 1985 January 28 (SSC-05). With very few exceptions, the work of the Taskforce was carried out by the participants in the Workshop, both during the workshop and in the subsequent weeks. This report is the collective effort of that group, whose very substantial contribution of time, effort, and thought is gratefully acknowledged.

  20. Federal Task Force Sends Recommendations to President on Fostering...

    Office of Environmental Management (EM)

    CCS is a group of technologies for capturing, compressing, transporting and permanently storing power plant and industrial source emissions of carbon dioxide. Rapid development and ...

  1. Northeast High-Level Radioactive Waste Transportation Task Force Agenda |

    Office of Environmental Management (EM)

    Synchrophasor Technology and Renewables Integration | Department of Energy Report - Synchrophasor Technology and Renewables Integration North American SynchroPhasor Initiative (NASPI) Technical Report - Synchrophasor Technology and Renewables Integration This technical report was developed in June 2012 by the North American SynchroPhasor Initiative, a collaboration between the North American electric industry (utilities, grid operators, vendors and consultants), the North American Electric

  2. Microsoft Word - Energy Code Enforcement Funding Task Force ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documents & Publications Webinar: Residential Energy Code Compliance National Electric Transmission Congestion Study - Draft for Public Comment August 2014 QER - Comment of IEEE

  3. Report of the Task Force on Nuclear Nonproliferation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    examining DOE's current areas of emphasis and potential misalignment, recommending actionable improvements, and suggesting how to overcome obstacles to successful implementation. ...

  4. Updates on the Interagency Task Force on Natural Gas Storage...

    Office of Environmental Management (EM)

    ... for Disease Control (CDC) have been in close contact with state and local officials in California as they study the health and environmental impacts of the Aliso Canyon leak. ...

  5. Department of Energy Establishes Asset Revitalization Task Force

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Corporate Overview - 2012 Department of Energy Corporate Overview - 2012 This book provides an overview of the Department of Energy (DOE). The opening sections describe the mission areas, organizational structure and upcoming critical issues of the Department, followed by brief descriptions of DOE's goals and programs. Later sections provide overviews of the Department's budget, staffing, contract management, project management, Congressional jurisdiction, Government Accountability Office (GAO)

  6. APPE forms task force to look at pipelines

    SciTech Connect (OSTI)

    1994-06-29

    The Association of Petrochemicals Producers in Europe (APPE; Brussels) is embarking on an initiative to help with restructuring. Speaking at the recent meeting of the European Chemical Industry Council in Cernobbio, Italy, Jukka Viinanen, president of APPE, said that although the initial ethylene restructuring plan collapsed, {open_quotes}it was not a complete failure.{close_quotes} The association Viinanen says, is continuing to find ways and means to improve the situation. {open_quotes}One of the things that APPE is now doing is to study carefully the [ethylene] pipeline system.{close_quotes}

  7. Interim Report of the Task Force on Nuclear Nonproliferation | Department

    Energy Savers [EERE]

    Integrated Safety Management (ISM) Integrated Safety Management (ISM) The objective of ISM is to perform work in a safe and environmentally sound manner. More specifically, as described in DOE P 450.4, Safety Management System Policy: "The Department and Contractors must systematically integrate safety into management and work practices at all levels so that missions are accomplished while protecting the public, the worker, and the environment. This is to be accomplished through effective

  8. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations

    Office of Environmental Management (EM)

    Number Program Title Activities Allowed or Unallowed Allowable Costs/Cost Principles Cash Management Davis Bacon Act Eligibility Equipment and Real Property Management Matching, Level of Effort, Earmarking Period of Availability of Federal Funds Procurement/ Suspension/ Debarment Program Income Real Property Acquisition/ Relocation Reporting Subrecipient Monitoring NEPA National Historic Preservation Act Special Tests and Provisions 81.036 Inventions and Innovations Yes Yes Yes Yes Yes Yes Yes

  9. July 15, 2014 SEAB Task Force Meeting on Technology Development...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Overview of Proposed "DARPA-Inspired" Approach to EM Technology Development (Download) 11:00AM-12:00PM Terry Michalske - Director, Savannah River National Lab (SRNL) Public Comment ...

  10. Northeast High-Level Radioactive Waste Transportation Task Force...

    Office of Environmental Management (EM)

    members & alternates appointment status Legislative Liaisons Staff ... (by speaker phone) 1:45 p.m. Update: Decommissioning Plant Coalition Nuclear Waste ...

  11. Beryllium Health and Safety Committee Data Reporting Task Force

    SciTech Connect (OSTI)

    MacQueen, D H

    2007-02-21

    On December 8, 1999, the Department of Energy (DOE) published Title 10 CFR 850 (hereafter referred to as the Rule) to establish a chronic beryllium disease prevention program (CBDPP) to: {sm_bullet} reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, {sm_bullet} minimize the levels of, and potential for, expos exposure to beryllium, and {sm_bullet} establish medical surveillance requirements to ensure early detection of the disease.

  12. Appendix 2. Task Force Members Biographies Cherry A. Murray...

    Office of Environmental Management (EM)

    ... in 1977. She received her Ph.D. in atomic physics from the University of ... Deputy Project Manager for the Fermi Gamma Ray Space Telescope 2004-2005. In 2007 she was ...

  13. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Planning Project Overview Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan...

  14. Report of the Task Force on Next Generation High Performance...

    Office of Environmental Management (EM)

    computing ecosystem, which includes investment in people, and in mathematics, computer science, software engineering, basic sciences, and materials science and engineering. ...

  15. Federal Smart Grid Task Force | Department of Energy

    Energy Savers [EERE]

    Department of Agriculture (USDA) - Rural Utility Service (RUS) Department of Defense (DOD) Federal Communications Commission (FCC) National Oceanic and Atmospheric Administration ...

  16. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  17. PROJECT TASK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PROJECT TASK STATEMENT BETWEEN Sandia Corporation AND British East India Company a corporation of the United Kingdom having a principal office in London, United Kingdom (hereinafter "Participant") Geothermal Dynamics This Project Task Statement (PTS) is under the authority and subject to all terms and conditions of Cooperative Research and Development Agreement (CRADA) No. SC##/####.##.##. A. PURPOSE Sandia National Laboratories (Sandia) and the British East India Company (BEIC) are

  18. Lift Forces

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lift Forces in Bubbly Flows Thomas Daly ∗ , Sreekanth Pannala † , Arthur Ruggles ∗ ∗ Department of Nuclear Engineering, University of Tennessee, 315 Pasqua Engineering Building, Knoxville, TN, 37996-2300 † Oak Ridge National Laboratory, P.O. Box 2008, Bldg. 5700, MS 6164 Oak Ridge, TN 37831-6164 tdaly1@utk.edu, pannalas@ornl.gov, aruggles@utk.edu INTRODUCTION Multiphase flows are found in a variety of engineering systems, two of the most notable categories being energy pro- duction and

  19. Environmental Restoration Quality Program Plan

    SciTech Connect (OSTI)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  20. Restoring Detroit's Street Lighting System

    SciTech Connect (OSTI)

    Kinzey, Bruce R.

    2015-10-21

    The City of Detroit is undertaking a comprehensive restoration of its street lighting system that includes transitioning the existing high-pressure sodium (HPS) sources to light-emitting diode (LED). Detroit’s well-publicized financial troubles over the last several years have added many hurdles and constraints to this process. Strategies to overcome these issues have largely been successful, but have also brought some mixed results. This document provides an objective review of the circumstances surrounding the system restoration, the processes undertaken and decisions made, and the results so far.

  1. Health and safety plan for operations performed for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Trippet, W.A. II ); Reneau, M.; Morton, S.L. )

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  2. Chizu Task Mapping Tool

    Energy Science and Technology Software Center (OSTI)

    2014-07-01

    Chizu is a tool for Mapping MPI processes or tasks to physical processors or nodes for optimizing communication performance. It takes the communication graph of a High Performance Computing (HPC) application and the interconnection topology of a supercomputer as input. It outputs a new MPI rand to processor mapping, which can be used when launching the HPC application.

  3. Technology needs for environmental restoration remedial action. Environmental Restoration Program

    SciTech Connect (OSTI)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  4. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  5. Restoration Monitoring-A Simple Photo Monitoring Method | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Restoration Monitoring-A Simple Photo Monitoring Method Restoration Monitoring-A Simple Photo Monitoring Method Restoration Monitoring-A Simple Photo Monitoring Method PDF icon ...

  6. Environmental Security and Restoration | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Security & Restoration Argonne's work in environmental security and restoration addresses soil, surface water, sediment, and groundwater at contaminated sites. Argonne's work in environmental restoration addresses soil, surface water, sediment, and groundwater at contaminated sites, starting with environmental evaluations and planning projects. Assessments are also conducted of approaches for long-term stewardship of remediated sites with residual contamination. Remedies range

  7. FAQS Reference Guide – Environmental Restoration

    Broader source: Energy.gov [DOE]

    This reference guide addresses the competency statements in the November 2002 edition of DOE-STD-1157-2002, Environmental Restoration Functional Area Qualification Standard.

  8. AWARD FEE DETERMINATION SCORECARD Contractor: Restoration Services...

    Office of Environmental Management (EM)

    Basis of Evaluation: FY14 Award Fee Plan for Restoration Services, Inc.; Portsmouth Environmental Technical Services II Award Fee Available: 349,708.00 Award Fee Earned:...

  9. Environmental Restoration and Performance-Based Remediation....

    Broader source: Energy.gov (indexed) [DOE]

    Policy Flash Environmental Restoration and Performance-Based Remediation. . . More Documents & Publications Oversight of Performance-based Contracts CRAD, Performance-Based...

  10. Sandia Energy - IEA PVPS Task 13 Activities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IEA PVPS Task 13 Activities Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Modeling & Analysis IEA PVPS Task 13 Activities IEA PVPS Task 13...

  11. Task automation in a successful industrial telerobot

    SciTech Connect (OSTI)

    Spelt, P.F.; Jones, S.L.

    1994-01-01

    In this paper, we discuss cooperative work by Oak Ridge National Laboratory and Remotec{trademark}, Inc., to automate components of the operator`s workload using Remotec`s Andros telerobot, thereby providing an enhanced user interface which can be retroll to existing fielded units as well as being incorporated into now production units. Remotec`s Andros robots are presently used by numerous electric utilities to perform tasks in reactors where substantial exposure to radiation exists, as well as by the armed forces and numerous law enforcement agencies. The automation of task components, as well as the video graphics display of the robot`s position in the environment, will enhance all tasks performed by these users, as well as enabling performance in terrain where the robots cannot presently perform due to lack of knowledge about, for instance, the degree of tilt of the robot. Enhanced performance of a successful industrial mobile robot leads to increased safety and efficiency of performances in hazardous environments. The addition of these capabilities will greatly enhance the utility of the robot, as well as its marketability.

  12. Restoration of the Potosi Dynamic Model 2010

    SciTech Connect (OSTI)

    Adushita, Yasmin; Leetaru, Hannes

    2014-09-30

    falls within the tubing erosional velocity limit. After 30 years, the plume extends 15 miles (24 km) in E-W and 14 miles (22 km) in N-S directions. After injection is completed, the plume continues to migrate laterally, mainly driven by the remaining pressure gradient. After 100 years post-injection, the plume extends 17 miles (27 km) in E-W and 15 miles (24 km) in N-S directions. The increase of reservoir pressure at the end of injection is approximately 370 psia around the injector and gradually decreases away from the well. The reservoir pressure increase is less than 30 psia beyond 14 miles (22 km) away from injector. The initial reservoir pressure is restored after approximately 20 years post-injection. This result, however, is associated with uncertainties on the boundary conditions, and a sensitivity analysis could be considered for the succeeding tasks. It is important to remember that the respective plume extent and areal pressure increase corresponds to an injection of 43 Mt CO2. Should the targeted cumulative injection of 96 Mt be achieved; a much larger plume extent and areal pressure increase could be expected. Re-evaluating the permeability modeling, vugs and heterogeneity distributions, and relative permeability input could be considered for the succeeding Potosi formation evaluations. A simulation using several injectors could also be considered to determine the required number of wells to achieve the injection target while taking into account the pressure interference.

  13. PV QA Task Group #2: Thermal and Mechanical Fatigue Including Vibration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy QA Task Group #2: Thermal and Mechanical Fatigue Including Vibration PV QA Task Group #2: Thermal and Mechanical Fatigue Including Vibration Presented at the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado pvmrw13_tmf_taskgroup2.pdf (500.28 KB) More Documents & Publications Linkage to Previous International PV Module QA Task Force Workshops: Proposal for Rating System Agenda for the PV Module Reliability Workshop, February 26 - 27 2013,

  14. ESPC ENABLE Draft Task Order

    Broader source: Energy.gov [DOE]

    Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project.

  15. Protective Force Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-30

    Provides detailed requirements to supplement DOE O 473.2, Protective Force Program, which establishes the requirements and responsibilities for management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Does not cancel other directives.

  16. Administering Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14

    The order provides requirements and responsibilities for administering work force discipline and corrective actions. Supersedes DOE O 3750.1.

  17. Fluid force transducer

    DOE Patents [OSTI]

    Jendrzejczyk, Joseph A.

    1982-01-01

    An electrical fluid force transducer for measuring the magnitude and direction of fluid forces caused by lateral fluid flow, includes a movable sleeve which is deflectable in response to the movement of fluid, and a rod fixed to the sleeve to translate forces applied to the sleeve to strain gauges attached to the rod, the strain gauges being connected in a bridge circuit arrangement enabling generation of a signal output indicative of the magnitude and direction of the force applied to the sleeve.

  18. Restoring Detroits Street Lighting System

    Energy Savers [EERE]

    Restoring Detroit's Street Lighting System September 2015 Bruce Kinzey PNNL- 24692 Restoring Detroit's Street Lighting System Bruce Kinzey September 2015 Prepared ...

  19. EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary...

    Energy Savers [EERE]

    73: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Summary Bonneville Power...

  20. EA-1974: Wallooskee-Youngs Confluence Restoration Project; Clatsop...

    Energy Savers [EERE]

    4: Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon EA-1974: Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Summary Bonneville ...

  1. A Review of Power Outages and Restoration Following the June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A Review of Power Outages and Restoration Following the June 2012 Derecho A Review of Power Outages and Restoration Following the June 2012 Derecho This report reviews power ...

  2. A Review of Power Outages and Restoration Following the June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 A Review of Power Outages and Restoration Following the June 2012 Derecho Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy ...

  3. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2006

    SciTech Connect (OSTI)

    Johnson, Gary E.; Borde, Amy B.; Dawley, Earl; Diefenderfer, Heida L.; Ebberts, Blaine D.; Putman, Douglas A.; Roegner, G. C.; Thom, Ronald M.; Vavrinec, John; Whiting, Allan H.

    2007-12-06

    This report is the third annual report of a six-year project to evaluate the cumulative effects of habitat restoration action in the Columbia River Estuary (CRE). The project is being conducted for the U.S. Army Corps of Engineers (Corps) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory, the Pt. Adams Biological Field Station of the National Marine Fisheries Service, and the Columbia River Estuary Study Taskforce. Measurement of the cumulative effects of ecological restoration projects in the Columbia River estuary is a formidable task because of the size and complexity of the estuarine landscape and the meta-populations of salmonids in the Columbia River basin. Despite the challenges presented by this system, developing and implementing appropriate indicators and methods to measure cumulative effects is the best way to enable estuary managers to track the overall effectiveness of investments in estuarine restoration projects. This project is developing methods to quantify the cumulative effects of multiple restoration activities in the CRE. The overall objectives of the 2006 study were to continue to develop techniques to assess cumulative effects, refine the standard monitoring protocols, and initiate development of an adaptive management system for Corps of Engineers’ habitat restoration monitoring efforts in the CRE. (The adaptive management effort will be reported at a later date.) Field studies during 2006 were conducted in tidal freshwater at Kandoll Farm on the lower Grays River and tidal brackish water at Vera Slough on Youngs Bay. Within each of area, we sampled one natural reference site and one restoration site. We addressed the overall objectives with field work in 2006 that, coupled with previous field data, had specific objectives and resulted in some important findings that are summarized here by chapter in this report. Each chapter of the report contains data on particular monitored variables for pre- and post-restoration

  4. The cost of wetland creation and restoration. Final report, [February 12, 1992--April 30, 1994]- Draft

    SciTech Connect (OSTI)

    King, D.; Costanza, R.

    1994-07-11

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  5. Summary - Operational Issues at the Environmental Restoration...

    Office of Environmental Management (EM)

    Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup...

  6. Environmental Restoration Disposal Facility - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Restoration Disposal Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  7. Economics in Criticality and Restoration of Energy Infrastructures.

    SciTech Connect (OSTI)

    Boyd, Gale A.; Flaim, Silvio J.; Folga, Stephen M.; Gotham, Douglas J.; McLamore, Michael R.; Novak, Mary H.; Roop, Joe M.; Rossmann, Charles G.; Shamsuddin, Shabbir A.; Zeichner, Lee M.; Stamber, Kevin L.

    2005-03-01

    Economists, systems analysts, engineers, regulatory specialists, and other experts were assembled from academia, the national laboratories, and the energy industry to discuss present restoration practices (many have already been defined to the level of operational protocols) in the sectors of the energy infrastructure as well as other infrastructures, to identify whether economics, a discipline concerned with the allocation of scarce resources, is explicitly or implicitly a part of restoration strategies, and if there are novel economic techniques and solution methods that could be used help encourage the restoration of energy services more quickly than present practices or to restore service more efficiently from an economic perspective. AcknowledgementsDevelopment of this work into a coherent product with a useful message has occurred thanks to the thoughtful support of several individuals:Kenneth Friedman, Department of Energy, Office of Energy Assurance, provided the impetus for the work, as well as several suggestions and reminders of direction along the way. Funding from DOE/OEA was critical to the completion of this effort.Arnold Baker, Chief Economist, Sandia National Laboratories, and James Peerenboom, Director, Infrastructure Assurance Center, Argonne National Laboratory, provided valuable contacts that helped to populate the authoring team with the proper mix of economists, engineers, and systems and regulatory specialists to meet the objectives of the work.Several individuals provided valuable review of the document at various stages of completion, and provided suggestions that were valuable to the editing process. This list of reviewers includes Jeffrey Roark, Economist, Tennessee Valley Authority; James R. Dalrymple, Manager of Transmission System Services and Transmission/Power Supply, Tennessee Valley Authority; William Mampre, Vice President, EN Engineering; Kevin Degenstein, EN Engineering; and Patrick Wilgang, Department of Energy, Office of

  8. Coulomb force as an entropic force

    SciTech Connect (OSTI)

    Wang Tower

    2010-05-15

    Motivated by Verlinde's theory of entropic gravity, we give a tentative explanation to the Coulomb's law with an entropic force. When trying to do this, we find the equipartition rule should be extended to charges and the concept of temperature should be reinterpreted. If one accepts the holographic principle as well as our generalizations and reinterpretations, then Coulomb's law, the Poisson equation, and the Maxwell equations can be derived smoothly. Our attempt can be regarded as a new way to unify the electromagnetic force with gravity, from the entropic origin. Possibly some of our postulates are related to the D-brane picture of black hole thermodynamics.

  9. Installation Restoration Program (IRP) preliminary assessment of the 154th air control squadron. 154th air control squadron, Kekkaha Armory, Hawaii Air National Guard, Kekaha, Kauai, Hawaii. Final report

    SciTech Connect (OSTI)

    1995-01-01

    The document identifies ANGRC attempt to assess possible Installation Restoration Program sites at the station. The process involves research via personal interviews, record searches, review historic data, assessing `As Built Drawings`, aerial photographs, and a site visit. Site investigations of hazardous wastes, installation restoration, soil pollution, site investigations, fuel contamination at air force facilities.

  10. Hill Air Force Base

    Broader source: Energy.gov [DOE]

    Energy savings performance contracting at Hill Air Force Base generated much interest during a recent training session on energy management that downlinked 12 Department of Defense sites. Energy...

  11. System restoration of a transmission network

    SciTech Connect (OSTI)

    Ebert, A.; Eppel, M.; Genthe, S.; Schwarzjirg, H.; Stark, J.; Werner, W. [Bayernwerke AG, Karlsfeld (Germany); [Siemens AG, Wien (Austria)

    1995-12-31

    In a large SCADA/EMS-System an Expertsystem for Fault Diagnosis and for System Restoration is integrated. The System Restoration covered by the Expertsystem gives assistance to the operator in any kind of blackout by presenting restoration plans. In case any number of busbars is outaged the system automatically determines the affected network areas and thereby the magnitude of the whole blackout. The restoration of the network is done in phases depending on the kind of blackout and is based on a global utility-strategy-plan. Within this scheme the detailed restoration plan is determined dynamically based on the actual situation and some predefinitions such as load priorities and power plants to be reenergized with priority. The described system covers all cases of blackouts by evaluating a plan based on the individual case. The Expertsystem is a hybrid system using an optimal power flow, too, and is fully integrated in the SCADA/EMS system. The plans of each phase are presented via the common MMI to the operator and supervised due to execution. The system distinguishes between operator wanted deviations and unwanted deviations during execution. Thus the operator at any time can continue as he likes.

  12. NREL Job Task Analysis: Quality Control Inspector

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Task 1: Maintain professional credentials Task 2: Confirm the allocation of ... * Conduct random sampling of worker credentials * Observe the workers * Interview the ...

  13. Protective Force Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-12-20

    Provides detailed requirements to supplement DOE O 473.2, PROTECTIVE FORCE PROGRAM, which establishes the requirements and responsibilities for management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Change 1 revised pages in Chapters IV and VI on 12/20/2001.

  14. EA-2006: Columbia Estuary Ecosystem Restoration Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, preparing a programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence through breaching dikes and levees; partial reconnection of tidal influence through culverts, bridges, and tidegates; enhancement of the quantity and quality of tidal channels; removal of invasive species; and restoration of riparian habitat conditions, such as planting native vegetation.

  15. Process for restoring membrane permeation properties

    DOE Patents [OSTI]

    Pinnau, Ingo; Toy, Lora G.; Casillas, Carlos G.

    1997-05-20

    A process for restoring the selectivity of high-flee-volume, glassy polymer membranes for condensable components over less-condensable components or non-condensable components of a gas mixture. The process involves exposing the membrane to suitable sorbent vapor, such as propane or butane, thereby reopening the microvoids that make up the free volume. The selectivity of an aged membrane may be restored to 70-100% of its original value. The selectivity of a membrane which is known to age over time can also be maintained by keeping the membrane in a vapor environment when it is not in use.

  16. Process for restoring membrane permeation properties

    DOE Patents [OSTI]

    Pinnau, I.; Toy, L.G.; Casillas, C.G.

    1997-05-20

    A process is described for restoring the selectivity of high-free-volume, glassy polymer membranes for condensable components over less-condensable components or non-condensable components of a gas mixture. The process involves exposing the membrane to suitable sorbent vapor, such as propane or butane, thereby reopening the microvoids that make up the free volume. The selectivity of an aged membrane may be restored to 70--100% of its original value. The selectivity of a membrane which is known to age over time can also be maintained by keeping the membrane in a vapor environment when it is not in use. 8 figs.

  17. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  18. Task

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Noise exposure d) Application of cold coal tar coating to asphalt * Dermal contact ... up of high concentrations of carbon monoxide gas CO andor other by-products of combustion. ...

  19. Task

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IH Activity/Hazard Table - Does not include all construction activities. Review the rules of use on Page 1 before determining the applicable controls required for your work. 1/4/2016 REV 10 1 Rules for the use of this table 1. DO NOT just copy from the table without modifying the hazards and control sets to the specific scope of work, means and methods of how work will be performed, applying the requirements of approved CSSPs, and duration, frequency, location, and extent of work to be

  20. FAQS Job Task Analyses- Radiation Protection

    Office of Energy Efficiency and Renewable Energy (EERE)

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  1. FAQS Job Task Analyses- Nuclear Safety Specialist

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  2. FAQS Job Task Analyses- Facility Representative

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  3. FAQS Job Task Analyses- Technical Program Manager

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  4. FAQS Job Task Analyses- General Technical Base

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  5. FAQS Job Task Analyses- Quality Assurance

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  6. FAQS Job Task Analyses- Weapons Quality Assurance

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  7. FAQS Job Task Analyses- Environmental Compliance

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  8. FAQS Job Task Analyses- Deactivation and Decommissioning

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  9. FAQS Job Task Analyses- Occupational Safety

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  10. FAQS Job Task Analyses- Emergency Management

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  11. FAQS Job Task Analyses- Technical Training

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  12. FAQS Job Task Analyses- DOE Aviation Manager

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  13. Functional Area Qualification Standard Job Task Analyses

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  14. FAQS Job Task Analyses- Safeguards and Security

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  15. FAQS Job Task Analyses- Chemical Processing

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  16. FAQS Job Task Analyses- Construction Management

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  17. FAQS Job Task Analyses- Industrial Hygiene

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  18. FAQS Job Task Analyses- Criticality Safety

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  19. JGI's Carbon Cycling Studies on Restored Marshes

    SciTech Connect (OSTI)

    Tringe, Susannah; Theroux, Susanna

    2015-06-02

    DOE Joint Genome Institute Metagenome Program Head, Susannah Tringe, and postdoc, Susie Theroux, discuss the lessons to be learned from studying the microbial diversity of marshes that have been converted to other uses, and are now being restored, as well as the potential impacts on the global carbon cycle.

  20. Method of restoring degraded solar cells

    DOE Patents [OSTI]

    Staebler, D.L.

    1983-02-01

    Amorphous silicon solar cells have been shown to have efficiencies which degrade as a result of long exposure to light. Annealing such cells in air at a temperature of about 200 C for at least 30 minutes restores their efficiency. 2 figs.

  1. NFWF Five Star & Urban Waters Restoration Program

    Broader source: Energy.gov [DOE]

    The National Fish and Wildlife Foundation (NFWF) is accepting applications for up to $2.1 million to develop community capacity to sustain local natural resources for future generations by providing modest financial assistance to diverse local partnership for wetland, riparian, forest and coastal habitat restoration, urban wildlife conservation, stormwater management as well as outreach, education and stewardship.

  2. Method of restoring degraded solar cells

    DOE Patents [OSTI]

    Staebler, David L.

    1983-01-01

    Amorphous silicon solar cells have been shown to have efficiencies which degrade as a result of long exposure to light. Annealing such cells in air at a temperature of about 200.degree. C. for at least 30 minutes restores their efficiency.

  3. Wind River Watershed Restoration: 1999 Annual Report.

    SciTech Connect (OSTI)

    Connolly, Patrick J.

    2001-09-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its first year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey--Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW). Following categories given in the FY1999 Statement of Work, the broad categories, the related objectives, and the entities associated with each objective (lead entity in boldface) were as follows: Coordination--Objective 1: Coordinate the Wind River watershed Action Committee (AC) and Technical Advisory Committee (TAC) to develop a prioritized list of watershed enhancement projects. Monitoring--Objective 2: Monitor natural production of juvenile, smolt, and adult steelhead in the Wind River subbasin. Objective 3: Evaluate physical habitat conditions in the Wind River subbasin. Assessment--Objective 4: Assess watershed health using an ecosystem-based diagnostic model that will provide the technical basis to prioritize out-year restoration projects. Restoration--Objective 5: Reduce road related sediment sources by reducing road densities to less than 2 miles per square mile. Objective 6: Rehabilitate riparian corridors, flood plains, and channel morphology to reduce maximum water temperatures to less than 61 F, to increase bank stability to greater than 90%, to reduce bankfull width to depth ratios to less than 30, and to provide natural levels of pools and cover for fish. Objective 7: Maintain and evaluate passage for adult and juvenile steelhead at artificial barriers. Education

  4. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect (OSTI)

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  5. Reduction-in-Force

    Broader source: Energy.gov [DOE]

    Reduction in force (RIF) is a set of regulations and procedures that are used to determine whether an employee keeps his or her present position, or whether the employee has a right to another...

  6. Protective Force Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-02-13

    To prescribe Department of Energy policy, responsibilities, and requirements for the management and operation of the Protective Force Program. Chg 1 dated 2-13-95. Cancels DOE O 5632.7 and DOE O 5632.8.

  7. Three-body forces

    SciTech Connect (OSTI)

    Nefkens, B.M.K.

    1986-10-15

    A review of current knowledge of three-body forces from experimental and theoretical standpoints is given. The 3-H and 3-He nuclei are discussed. Also, nucleon scattering from deuterium is discussed. (AIP)

  8. Federal Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-07-15

    This Manual establishes requirements for the management and operation of the Department of Energy (DOE) Federal protective forces (FPFs). Cancels DOE M 470.4-3, Chg 1. Canceled by DOE O 473.3.

  9. Pacific Lamprey Research and Restoration : Annual Report 1996.

    SciTech Connect (OSTI)

    Jackson, Aaron D.

    1997-01-01

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations. The Pacific lamprey is an important part of the food web of North Pacific ecosystems, both as predator and prey. Lamprey (a.k.a. eels) are also a valuable food and culture resource for American Indian Tribes of the Pacific Northwest. Depressed Pacific lamprey runs have impacted treaty secured fishing opportunities by forcing tribal members to gather this traditional food in lower Columbia River locations. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of The Umatilla Indian Reservation, the Columbia River Intertribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam. The initial objectives of the project are to determine the past and current abundance of Pacific lamprey stocks in major mid Columbia tributaries and at various hydroelectric facilities, and to determine factors limiting Pacific lamprey abundance and distribution. Ultimately, Pacific lamprey restoration plans will be developed and implemented. Part (A)-CTUIR: (1) determine past and present abundance and distribution in NE Oregon and SE Washington tributaries; and (2) determine limiting habitat factors. Part (B)-CRITFC: (1) adult abundance monitoring at Columbia and Snake River dams; (2) juvenile abundance monitoring at Columbia and Snake River dams; and (3) juvenile passage impediments and needed improvements at Columbia and Snake River dams. Part (C)- OSU: (1) adult passage impediments and needed improvements at Columbia and Snake River dams; and (2) juvenile passage impediments and needed improvements at Columbia and Snake River dams.

  10. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    SciTech Connect (OSTI)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP) that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological

  11. Operational Issues at the Environmental Restoration Disposal Facility at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford | Department of Energy Operational Issues at the Environmental Restoration Disposal Facility at Hanford Operational Issues at the Environmental Restoration Disposal Facility at Hanford Full Document and Summary Versions are available for download Operational Issues at the Environmental Restoration Disposal Facility at Hanford (238.34 KB) Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford (56.27 KB) More Documents & Publications Idaho

  12. REMEDIATE AND RESTORE GROUNDWATER TO HIGHEST BENEFICIAL USE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REMEDIATE AND RESTORE GROUNDWATER TO HIGHEST BENEFICIAL USE ■ Groundwater is to be cleaned up and restored to the highest bene cial use.* ■ Restoration should be within a reasonable time frame, commensurate with risk and Tri-Party Agreement timelines. ■ Ongoing groundwater remediation activities and review processes should be fully funded. ■ Technology development should continually be pursued to remediate and restore groundwater to highest bene cial use.* ■ The public and tribes must

  13. The Use of Ecological Restoration Principles To Achieve Remedy Protection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at the Fernald Preserve and Weldon Spring Sites | Department of Energy The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites The Use of Ecological Restoration Principles To Achieve

  14. Enforcement Letter, Fernald Environmental Restoration- September 12, 1996

    Broader source: Energy.gov [DOE]

    Issued to the Fernald Environmental Restoration Management Corporation related to the Radiation Control Technician Training Program at the Fernald Site

  15. Technology needs for environmental restoration remedial action

    SciTech Connect (OSTI)

    Watson, J.S.

    1992-11-01

    This report summarizes the current view of the most important technology needs for the US Department of Energy (DOE) facilities operated by Martin Marietta Energy Systems, Inc. These facilities are the Oak Ridge National Laboratory, the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, the Paducah Gaseous Diffusion Plant, and the Portsmouth Gaseous Diffusion Plant. The sources of information used in this assessment were a survey of selected representatives of the Environmental Restoration (ER) programs at each facility, results from a questionnaire distributed by Geotech CWM, Inc., for DOE, and associated discussions with individuals from each facility. This is not a final assessment, but a brief look at an ongoing assessment; the needs will change as the plans for restoration change and, it is hoped, as some technical problems are solved through successful development programs.

  16. Big Canyon Creek Ecological Restoration Strategy.

    SciTech Connect (OSTI)

    Rasmussen, Lynn; Richardson, Shannon

    2007-10-01

    He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe

  17. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  18. Small Business Issues for Environmental Restoration Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement

  19. Russian: United States Environmental Restoration Workshop

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The Russian - United States Environmental Restoration Workshop, held in Washington, D.C., and Richland, Washington, from April 5 through 18, 1993, was the first extended collaborative information exchange between the US Department of Energy (DOE) and Russian scientists at the site level. In addition to the Russian scientists, workshop participants included scientists and staff from DOE, Pacific Northwest Laboratory (PNL), Westinghouse Hanford Company (WHC), the US Environmental Training Institute (USETI), universities, and the private sector. The first week (April 5 through 10) of the workshop took place in Washington, D.C., where the Russian and US participants were presented with a US perspective on environmental restoration and remediation issues from representatives in DOE and the US Environmental Protection Agency (EPA). The second week (April 11 through 18) occurred in Richland, Washington, where the participants were presented with site-specific environmental restoration and remediation issues related to Hanford Site cleanup. This report is a compilation of the presentations, discussions, and experiences shared during the second week of the workshop in Richland, Washington.

  20. Strategic planning for power system restorations

    SciTech Connect (OSTI)

    Bent, Russell W; Van Hententyck, Pascal; Coffrin, Carleton

    2010-10-12

    This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

  1. Work Force Restructuring Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to

  2. Fault-tolerant dynamic task graph scheduling

    SciTech Connect (OSTI)

    Kurt, Mehmet C.; Krishnamoorthy, Sriram; Agrawal, Kunal; Agrawal, Gagan

    2014-11-16

    In this paper, we present an approach to fault tolerant execution of dynamic task graphs scheduled using work stealing. In particular, we focus on selective and localized recovery of tasks in the presence of soft faults. We elicit from the user the basic task graph structure in terms of successor and predecessor relationships. The work stealing-based algorithm to schedule such a task graph is augmented to enable recovery when the data and meta-data associated with a task get corrupted. We use this redundancy, and the knowledge of the task graph structure, to selectively recover from faults with low space and time overheads. We show that the fault tolerant design retains the essential properties of the underlying work stealing-based task scheduling algorithm, and that the fault tolerant execution is asymptotically optimal when task re-execution is taken into account. Experimental evaluation demonstrates the low cost of recovery under various fault scenarios.

  3. Work Force Discipline

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-03-23

    The order provides guidance and procedures and states responsibilities for maintaining work force discipline in DOE. Chg 1, dated 3-11-85; Chg 2, dated 1-6-86; Chg 3, dated 3-21-89; Chg 4, dated 8-2-90; Chg 5, dated 3-9-92; Chg 6, dated 8-21-92, cancels Chg 5.

  4. Protective Force Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-30

    Establishes policy, requirements, responsibilities, and authorities, for the management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Extended until 7-7-06 by DOE N 251.64, dated 7-7-05 Cancels: DOE 5632.7A

  5. Direct Aerosol Forcing Uncertainty

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Mccomiskey, Allison

    2008-01-15

    Understanding sources of uncertainty in aerosol direct radiative forcing (DRF), the difference in a given radiative flux component with and without aerosol, is essential to quantifying changes in Earth's radiation budget. We examine the uncertainty in DRF due to measurement uncertainty in the quantities on which it depends: aerosol optical depth, single scattering albedo, asymmetry parameter, solar geometry, and surface albedo. Direct radiative forcing at the top of the atmosphere and at the surface as well as sensitivities, the changes in DRF in response to unit changes in individual aerosol or surface properties, are calculated at three locations representing distinct aerosol types and radiative environments. The uncertainty in DRF associated with a given property is computed as the product of the sensitivity and typical measurement uncertainty in the respective aerosol or surface property. Sensitivity and uncertainty values permit estimation of total uncertainty in calculated DRF and identification of properties that most limit accuracy in estimating forcing. Total uncertainties in modeled local diurnally averaged forcing range from 0.2 to 1.3 W m-2 (42 to 20%) depending on location (from tropical to polar sites), solar zenith angle, surface reflectance, aerosol type, and aerosol optical depth. The largest contributor to total uncertainty in DRF is usually single scattering albedo; however decreasing measurement uncertainties for any property would increase accuracy in DRF. Comparison of two radiative transfer models suggests the contribution of modeling error is small compared to the total uncertainty although comparable to uncertainty arising from some individual properties.

  6. Contractor Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-11-05

    This Manual establishes requirements for the management and operation of the U.S. Department of Energy contractor protective forces. Cancels: DOE M 470.4-3 Chg 1, CRD (Attachment 2) only, except for Section C. Canceled by DOE O 473.3.

  7. The parallel approach to force/position control of robotic manipulators

    SciTech Connect (OSTI)

    Chiaverini, S.; Sciavicco, L.

    1993-08-01

    Force/position control strategies provide an effective framework to deal with tasks involving interaction with the environment. In this paper the parallel approach to force/position control of robotic manipulators is presented. It allows a complete use of the available sensor measurements by operating the control action in a full-dimensional space without using selection matrices. Conflicting situations between the position and force tasks are managed using a priority strategy: the force control loop is designed to prevail over the position control loop. This choice ensures limited deviations from the prescribed force trajectory in every situation, guaranteeing automatic recovery from unplanned collisions. A dynamic force/position parallel control law is presented and its performance in presence of an elastic environment is analyzed; simplification of the dynamic control law is also discussed leading to a PID-type parallel controller. Two case studies are worked out that show the effectiveness of the approach in application to an industrial robot.

  8. Planning aquatic ecosystem restoration monitoring programs

    SciTech Connect (OSTI)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  9. FAQS Qualification Card – Environmental Restoration

    Broader source: Energy.gov [DOE]

    A key element for the Department’s Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA).

  10. Force Modulator System

    SciTech Connect (OSTI)

    Redmond Clark

    2009-04-30

    Many metal parts manufacturers use large metal presses to shape sheet metal into finished products like car body parts, jet wing and fuselage surfaces, etc. These metal presses take sheet metal and - with enormous force - reshape the metal into a fully formed part in a manner of seconds. Although highly efficient, the forces involved in forming metal parts also damage the press itself, limit the metals used in part production, slow press operations and, when not properly controlled, cause the manufacture of large volumes of defective metal parts. To date, the metal-forming industry has not been able to develop a metal-holding technology that allows full control of press forces during the part forming process. This is of particular importance in the automotive lightweighting efforts under way in the US automotive manufacturing marketplace. Metalforming Controls Technology Inc. (MC2) has developed a patented press control system called the Force Modulator that has the ability to control these press forces, allowing a breakthrough in stamping process control. The technology includes a series of hydraulic cylinders that provide controlled tonnage at all points in the forming process. At the same time, the unique cylinder design allows for the generation of very high levels of clamping forces (very high tonnages) in very small spaces; a requirement for forming medium and large panels out of HSS and AHSS. Successful production application of these systems testing at multiple stamping operations - including Ford and Chrysler - has validated the capabilities and economic benefits of the system. Although this technology has been adopted in a number of stamping operations, one of the primary barriers to faster adoption and application of this technology in HSS projects is system cost. The cost issue has surfaced because the systems currently in use are built for each individual die as a custom application, thus driving higher tooling costs. This project proposed to better

  11. TEXT Pro Force Training

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Basic Protective Force Training Program DOE/IG-0641 March 2004 * None of the 10 sites included instruction in rappelling even though it was part of the special response team core curriculum and continued to be offered by the Nonprolif- eration and National Security Institute; * Only one site conducted basic training on use of a shotgun, despite the fact that a num- ber of sites used the weapon for breaching exercises and other purposes; and, * Seven of the sites modified prescribed training

  12. ARMY SERVICE FORCES

    Office of Legacy Management (LM)

    ARMY SERVICE FORCES ' -, 1 MANHATTAN ENGINEER DISTRICT --t 4 IN "LPLI RC,' LR io EIDM CIS INTELLIGENCE AND SECURITY DIVISION CHICAGO BRANCH OFFICE i ., -,* - P. 0. Box 6770-A I ' 1 .' CHICAGO 80. ILLINOIS /lvb 15 February 1945 Subject: shipment Security Survey at &Uinckrodt Chemical Works. MEMORANDUM to the Officer in Charge. 1. The Mallinckrodt Chemical Works, St. Louis, Missouri, was contacted by the undersigned on 16 November 1944, for the purpose of -king an investigation to

  13. FAQS Job Task Analyses Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form FAQS Job Task Analyses Form Step 1, Identify and evaluate tasks; Step 2, Identify and evaluate competencies; and Step 3, Evaluate linkage between tasks and competencies. FAQS Job Task Analyses Form (18.57 KB) More Documents & Publications FAQS Job Task Analyses - Emergency Management FAQS Job Task Analyses - Environmental Compliance FAQS Job Task Analyses - Chemical Processing

  14. Assessing data quality for a federal environmental restoration project: Rationalizing the requirements of multiple clients

    SciTech Connect (OSTI)

    Kiszka, V.R.; Carlsen, T.M.

    1994-07-01

    Most environmental restoration projects at federal facilities face the difficult task of melding the quality assurance (QA) requirements of multiple clients, as well as dealing with historical data that are often of unknown quality. At Lawrence Livermore National Laboratory (LLNL), we have successfully integrated the requirements of our multiple clients by carefully developing a QA program that efficiently meets our clients` needs. The Site 300 Experimental Test Site is operated by LLNL in support of its national defense program. The responsibility for conducting environmental contaminant investigations and restoration at Site 300 is vested in the Site 300 Environmental Restoration Project (Site 300 ERP) of LLNL`s Environmental Restoration Division. LLNL Site 300 ERP must comply with the QA requirements of several clients, which include: the LLNL Environmental Protection Department, the DOE, the US Environmental Protection Agency-Region IX (EPA), the California Regional Water Quality Control Board -- Central Valley Region, and the California Department of Toxic Substances Control. This comprehensive QA program was used to determine the acceptability of historical data. The Site 300 ERP began soil and ground water investigations in 1982. However, we did not begin receiving analytical quality assurance/quality control (QA/QC) data until 1989; therefore, the pre-1989 data that were collected are of unknown quality. The US EPA QAMS-005/80 defines data quality as the totality of features and characteristics of data that bears on its ability to satisfy a given purpose. In the current context, the characteristics of major importance are accuracy, precision, completeness, representativeness, and comparability. Using our established QA program, we determined the quality of this historical data based on its comparability to the post-1989 data. By accepting this historical data, we were able to save a considerable amount of money in recharacterization costs.

  15. Environmental Restoration Program Document Control Plan

    SciTech Connect (OSTI)

    Montgomery, L.M.

    1993-09-01

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  16. Infrastructure Security and Energy Restoration (ISER) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Infrastructure Security and Energy Restoration (ISER) Infrastructure Security and Energy Restoration (ISER) Infrastructure Security and Energy Restoration (ISER) Helping to Ensure a Secure and Reliable Flow of Energy to the Nation Applying the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure. We work with the Department of Homeland Security, the Federal Energy Regulatory

  17. Trestle Bay Restoration Project Draft Feasibility Study and Draft

    Broader source: Energy.gov (indexed) [DOE]

    Local Operating Procedures for Endangered Species to Administer Stream Restoration and Fish Passage Improvement Actions Authorized or Carried Out by the U.S. Army Corps of...

  18. Contractor: Restoration Services, Inc. Contract: DE-EM0002639

    Office of Environmental Management (EM)

    Restoration Services, Inc. Contract: DE-EM0002639 Award Fee Evaluation Period 2 Determination Scorecard Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September ...

  19. Montana Watershed Restoration Plans Wiki | Open Energy Information

    Open Energy Info (EERE)

    Plans Wiki Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Montana Watershed Restoration Plans Wiki Abstract Provides an overview of...

  20. Secondary succession, community assembly and restoration in grasslands and savannas.

    SciTech Connect (OSTI)

    Foster, Bryan, L.; Aschenbach, Todd

    2010-02-01

    A final report made to the US Forest Service that addresses savannah restoration research findings from research conducted at the Savannah River Site in South Carolina.

  1. The Potential for Renewable Energy Development to Benefit Restoration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Potential for Renewable Energy Development to Benefit Restoration of the Salton Sea: ... and Marc Melaina National Renewable Energy Laboratory Technical Report NREL...

  2. SolarPower Restoration Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    Solar Product: SolarPower Restoration Systems is pursuing Building Integrated Photovoltaics (BIPV) systems and large scale Photovoltaic Power (PV) Array Systems over concrete...

  3. Microsoft Word - WM Paper - Eco-Restoration Final.doc

    Broader source: Energy.gov (indexed) [DOE]

    Compensation and Liability Act (CERCLA). WM2008 Conference, February 24-28, 2008, Phoenix, AZ Remedial activities and subsequent ecological restoration have converted the site...

  4. Restoration Prioritization Toolset: Documentation and Users Guides 2007

    SciTech Connect (OSTI)

    Judd, Chaeli; Woodruff, Dana L.; Thom, Ronald M.; Anderson, Michael G.; Borde, Amy B.

    2007-10-26

    This users guide provides technical background and details on the Restoration Prioritization Toolset developed for GoMRC as well as instructions for use.

  5. Atomic Force Microscope

    SciTech Connect (OSTI)

    Day, R.D.; Russell, P.E.

    1988-12-01

    The Atomic Force Microscope (AFM) is a recently developed instrument that has achieved atomic resolution imaging of both conducting and non- conducting surfaces. Because the AFM is in the early stages of development, and because of the difficulty of building the instrument, it is currently in use in fewer than ten laboratories worldwide. It promises to be a valuable tool for obtaining information about engineering surfaces and aiding the .study of precision fabrication processes. This paper gives an overview of AFM technology and presents plans to build an instrument designed to look at engineering surfaces.

  6. Joint Outreach Task Group Calendar: September 2013

    Broader source: Energy.gov [DOE]

    Joint Outreach Task Group (JOTG)has created a monthly calendar of community events to facilitate interagency and community involvement in these events. September 2013

  7. NREL Job Task Analysis: Quality Control Inspector

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2011-05-01

    A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence.

  8. NREL Job Task Analysis: Energy Auditor

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2011-05-01

    A summary of job task analyses for the position of energy auditor when evaluating a residence before and during weatherization work.

  9. Miniature quartz resonator force transducer

    DOE Patents [OSTI]

    EerNisse, E.P.

    The invention relates to a piezoelectric quartz force transducer having the shape of a double-ended tuning fork.

  10. Miniature quartz resonator force transducer

    DOE Patents [OSTI]

    Eer Nisse, Errol P.

    1980-01-01

    The invention relates to a piezoelectric quartz force transducer having the shape of a double-ended tuning fork.

  11. Force-Field Parameter Fitter

    Energy Science and Technology Software Center (OSTI)

    2015-05-27

    ParFit is a flexible and extendable framework and library of classes for fitting force-field parameters to data from high-level ab-initio calculations on the basis of deterministic and stochastic algorithms. Currently, the code is fitting MM3 and Merck force-field parameters but could easily extend to other force-field types.

  12. Report of the Task Force on Technology Development for Environmental Management

    Broader source: Energy.gov [DOE]

    SEAB findings and recommendations on the value of a renewed environmental management science and technology development effort and how such a program would be structured.

  13. THE SECRETARY OF ENERGY ADVISORY BOARD (SEAB) TASK FORCE ON BIOMEDICAL

    Energy Savers [EERE]

    INSTITUTIONAL ORIGINS OF THE DEPARTMENT OF ENERGY ManhattanEngineerDistrict (1942-1946) Ex ExecutiveOfficeof thePresident EnergyPolicyOffice(1973) Federal * .,.-, Office (1973-1974) AtomicEnergyCommission (1947 -1975) Federal Energy Administration (1974) -1977) Energy Research and DevelopmentAdministration3 (1975 - 1977) INCLUDES 1sPECIALEnergy Office ( t7J) tklr ... Energy Office(lt13) 2 Trea y-EnergyOffice ._ 011 Import Ad I 1 ,..,_All_ fMruC**n**'" 01or11 Oooa ... ,._.,. Oil and Gas 3

  14. The Secretary of Energy Advisory Board (SEAB) Task Force on CO2 Utilization

    Energy Savers [EERE]

    Department of Energy The SUN Project Enhances STEM Education for Native American Youth The SUN Project Enhances STEM Education for Native American Youth April 2, 2014 - 1:25pm Addthis The SUN Project Enhances STEM Education for Native American Youth Annie Whatley Annie Whatley Deputy Director, Office of Minority Education and Community Development Last October, the Department of Energy awarded the American Indian Science and Engineering Society (AISES) a grant to implement a new program

  15. West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force

    Broader source: Energy.gov [DOE]

    Presentation made by Raymond C. Vaughan for the NTSF annual meeting held from May 14-16, 2013 in Buffalo, NY. 

  16. The Secretary of Energy Advisory Board (SEAB) Task Force to Support...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Steven Specker, Former President, EPRI Dr. Susan Tierney, Analysis Group Dan Yergin (ex-officio), IHS Cambridge Energy Research Associates* *SEAB Member Designated Federal Officer: ...

  17. The Secretary of Energy Advisory Board (SEAB) Task Force on Biomedical...

    Broader source: Energy.gov (indexed) [DOE]

    range of scales Instruments and methods for observing and measuring the functions and dynamics of large biomolecules, including multi-molecular complexes Material sciences and...

  18. Report of the Interagency Task Force on High Energy Density Physics

    SciTech Connect (OSTI)

    2007-08-01

    Identifies the needs for improving Federal stewardship of specific aspects of high energy density physics, particularly the study of high energy density plasmas in the laboratory, and strengthening university activities in this latter discipline. The report articulates how HEDP fits into the portfolio of federally funded missions and includes agency actions to be taken that are necessary to further this area of study consistent with Federal priorities and plans, while being responsive to the needs of the scientific community.

  19. Nanotechnology applications to desalination : a report for the joint water reuse & desalination task force.

    SciTech Connect (OSTI)

    Brady, Patrick Vane; Mayer, Tom; Cygan, Randall Timothy

    2011-01-01

    Nanomaterials and nanotechnology methods have been an integral part of international research over the past decade. Because many traditional water treatment technologies (e.g. membrane filtration, biofouling, scale inhibition, etc.) depend on nanoscale processes, it is reasonable to expect one outcome of nanotechnology research to be better, nano-engineered water treatment approaches. The most immediate, and possibly greatest, impact of nanotechnology on desalination methods will likely be the development of membranes engineered at the near-molecular level. Aquaporin proteins that channel water across cell membranes with very low energy inputs point to the potential for dramatically improved performance. Aquaporin-laced polymer membranes and aquaporin-mimicking carbon nanotubes and metal oxide membranes developed in the lab support this. A critical limitation to widespread use of nanoengineered desalination membranes will be their scalability to industrial fabrication processes. Subsequent, long-term improvements in nanoengineered membranes may result in self-healing membranes that ideally are (1) more resistant to biofouling, (2) have biocidal properties, and/or (3) selectively target trace contaminants.

  20. Microsoft Word - SEAB Lab Task Force Interim Report Final.docx

    Office of Environmental Management (EM)

    ... These investments, over many years, led to higher-resolution static images from a miniaturized package (miniSAR) deployed on unmanned aerial vehicles, advanced imaging of moving ...

  1. Report of the Secretary of Energy Task Force on DOE National...

    Broader source: Energy.gov (indexed) [DOE]

    ... These investments, over many years, led to higher-resolution static images from a miniaturized package (miniSAR) deployed on unmanned aerial vehicles, advanced imaging of moving ...

  2. Report of the Secretary of Energy Task Force on DOE National Laboratories

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies. STEAM TIP SHEET #20 Replace Pressure-Reducing Valves with Backpressure Turbogenerators (January 2012) (451.58 KB) More Documents & Publications Consider Installing High-Pressure Boilers with Backpressure Turbine-Generators How to Calculate the True Cost of Steam Steam System Survey Guide Energy

    Belt drives

  3. Secretary of Energy Advisory Board to Discuss Hubs+ and FracFocus Task Force Final Reports

    Broader source: Energy.gov [DOE]

    Washington, D.C. – On Friday, March 28, 2014, the Secretary of Energy Advisory Board (SEAB), which provides advice and recommendations on the Department’s activities, will meet to discuss and take...

  4. Dutchess County Resource Recovery Task Force report: Dutchess County Pyrolysis Program

    SciTech Connect (OSTI)

    None

    1980-07-01

    Dutchess County initiated development of a long-range master plan for Solid Waste Management in 1971. The plan included development of a resource recovery facility to service the municipalities in the County population center. Based on early recommendations, a pyrolysis facility employing Purox technology was to be implemented. A feasibility study, paid for by County funds was completed in 1975. The study provided siting recommendations, estimation of available waste, and preliminary facility design. Because of various considerations, the project was not developed. Under the Department of Energy grant, the County reassessed the feasibility of a resource recovery facility, with emphasis on confirming previous conclusions supporting the Purox technology, waste availability, energy recovery and sale and siting of the plant. The conclusions reached in the new study were: a resource recovery facility is feasible for the County; sufficient waste for such a facility is available and subject to control; While Purox technology was feasible it is not the most appropriate available technoloy for the County; that mass burning with steam recovery is the most appropriate technology; and that resource recovery while presently more expensive than landfilling, represents the only cost effective, energy efficient, and environmentally sound way to handle the solid waste problem in the County.

  5. SECRETARY OF ENERGY ADVISORY BOARD (SEAB) TASK FORCE ON THE FUTURE OF

    Energy Savers [EERE]

    SEAB_Minutes_1_20_11.pdf SEAB_Minutes_1_20_11.pdf (211.5 KB) More Documents & Publications January2011SEAB_Agenda.pdf Secretary of Energy Advisory Board - July 20, 2011 Meeting Minutes Secretary of Energy Advisory Board - August 15, 2011 Meeting Minutes of Energy

    SECA Fuel Cell Program Moves Two Key Projects Into Next Phase SECA Fuel Cell Program Moves Two Key Projects Into Next Phase February 5, 2009 - 12:00pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) has

  6. The Secretary of Energy Advisory Board (SEAB) Task Force on Technology Development for Environmental Management

    Broader source: Energy.gov [DOE]

    While the Department's Office of Environmental Management (EM) has made significant progress in closing a number of projects, many of the most challenging projects remain and will for decades to...

  7. Secretary of Energy Advisory Board FracFocus2.0 Task Force Public Meeting

    Broader source: Energy.gov (indexed) [DOE]

    Delivered | Department of Energy Thank you, Tanaka-san. We do indeed have a history together. In fact, his kind introduction was simply a repayment for my kind introduction of him at MIT a few years ago. I also want to thank Chairman Hanyu for his remarks, and for the hospitality of the Sasakawa Peace Foundation for hosting this event. I'll also go back with Mr. Tanaka and just note that it was a pleasure, certainly, working with him at the IEA and of course subsequently, and I just want to

  8. The Secretary of Energy Advisory Board (SEAB) Task Force on Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maloney, CH2M Hill Gerald Boyd, SM Stoller Corporation * SEAB Member DESIGNATED FEDERAL OFFICIAL: Corey Williams-Allen, Deputy Director, Office of Secretaral Boards and Councils

  9. Secretary of Energy Advisory Board (SEAB) Task Force on the Future...

    Broader source: Energy.gov (indexed) [DOE]

    the Future of Nuclear Power is composed of SEAB members and independent experts. Nuclear ... costs with other countries such as China, France, India, Japan, Russia, and South Korea ...

  10. The Secretary of Energy Advisory Board (SEAB) Task Force on Next...

    Office of Environmental Management (EM)

    Related basic research necessary to enable next generation high performance computing (e.g. mathematics, computer science, etc., including quantum and superconducting computing). ...

  11. TASK 2: QUENCH ZONE SIMULATION

    SciTech Connect (OSTI)

    Fusselman, Steve

    2015-09-30

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. A key feature of the AR gasifier design is the transition from the gasifier outlet into the quench zone, where the raw syngas is cooled to ~ 400°C by injection and vaporization of atomized water. Earlier pilot plant testing revealed a propensity for the original gasifier outlet design to accumulate slag in the outlet, leading to erratic syngas flow from the outlet. Subsequent design modifications successfully resolved this issue in the pilot plant gasifier. In order to gain greater insight into the physical phenomena occurring within this zone, AR developed a cold flow simulation apparatus with Coanda Research & Development with a high degree of similitude to hot fire conditions with the pilot scale gasifier design, and capable of accommodating a scaled-down quench zone for a demonstration-scale gasifier. The objective of this task was to validate similitude of the cold flow simulation model by comparison of pilot-scale outlet design performance, and to assess demonstration scale gasifier design feasibility from testing of a scaled-down outlet design. Test results did exhibit a strong correspondence with the two pilot scale outlet designs, indicating credible similitude for the cold flow simulation device. Testing of the scaled-down outlet revealed important considerations in the design and operation of the demonstration scale gasifier, in particular pertaining to the relative momentum between the downcoming raw syngas and the sprayed quench water and associated impacts on flow patterns within the quench zone. This report describes key findings from the test program, including assessment of pilot plant configuration simulations relative to actual

  12. Normal Force and Drag Force in Magnetorheological Finishing

    SciTech Connect (OSTI)

    Miao, C.; Shafrir, S.N.; Lambropoulos, J.C.; Jacobs, S.D.

    2010-01-13

    The material removal in magnetorheological finishing (MRF) is known to be controlled by shear stress, tau, which equals drag force, Fd, divided by spot area, As. However, it is unclear how the normal force, Fn, affects the material removal in MRF and how the measured ratio of drag force to normal force Fd/Fn, equivalent to coefficient of friction, is related to material removal. This work studies, for the first time for MRF, the normal force and the measured ratio Fd/Fn as a function of material mechanical properties. Experimental data were obtained by taking spots on a variety of materials including optical glasses and hard ceramics with a spot-taking machine (STM). Drag force and normal force were measured with a dual load cell. Drag force decreases linearly with increasing material hardness. In contrast, normal force increases with hardness for glasses, saturating at high hardness values for ceramics. Volumetric removal rate decreases with normal force across all materials. The measured ratio Fd/Fn shows a strong negative linear correlation with material hardness. Hard materials exhibit a low coefficient of friction. The volumetric removal rate increases with the measured ratio Fd/Fn which is also correlated with shear stress, indicating that the measured ratio Fd/Fn is a useful measure of material removal in MRF.

  13. Fernald Preserve 2015 Site Environmental Report Appendix D Environmental Restoration

    Office of Legacy Management (LM)

    Restoration This page intentionally left blank U.S. Department of Energy Fernald Preserve 2015 Site Environmental Report May 2016 Doc. No. S13591 Page D-i Contents Abbreviations ............................................................................................................................. D-iii Measurement Abbreviations ...................................................................................................... D-iii D.1.0 Ecological Restoration Monitoring

  14. Task mapping for non-contiguous allocations.

    SciTech Connect (OSTI)

    Leung, Vitus Joseph; Bunde, David P.; Ebbers, Johnathan; Price, Nicholas W.; Swank, Matthew; Feer, Stefan P.; Rhodes, Zachary D.

    2013-02-01

    This paper examines task mapping algorithms for non-contiguously allocated parallel jobs. Several studies have shown that task placement affects job running time for both contiguously and non-contiguously allocated jobs. Traditionally, work on task mapping either uses a very general model where the job has an arbitrary communication pattern or assumes that jobs are allocated contiguously, making them completely isolated from each other. A middle ground between these two cases is the mapping problem for non-contiguous jobs having a specific communication pattern. We propose several task mapping algorithms for jobs with a stencil communication pattern and evaluate them using experiments and simulations. Our strategies improve the running time of a MiniApp by as much as 30% over a baseline strategy. Furthermore, this improvement increases markedly with the job size, demonstrating the importance of task mapping as systems grow toward exascale.

  15. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    SciTech Connect (OSTI)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  16. Silicone injection restores failing submarine cables

    SciTech Connect (OSTI)

    Tilstra, M.

    1995-12-01

    Faced with the prospect of replacing nearly 10 miles of aging undersea cables, Orcas Power & Light Co (Opalco) elected instead to inject silicone into as many of the cables as possible. Silicone injection has been used extensively on underground residential distribution (URD) and feeder cables, but only two underwater cables had previously been injected: a feeder cable for Florida Power Corp under an intercoastal waterway and a cable for Washington Water Power Co under a lake in western Idaho. The compound restores power cables damaged by water treeing and prevents further water damage. Selection criteria included age, type, and whether the cables had ever been spliced. Older, soldered, hand-wrapped splices were avoided as they block the CableCure fluid from flowing through. This makes the cable uninjectable unless the splices are replaced with the molded type. The first cables chosen for injection were between 15 and 30 years old and clear of soldered splices. They also were free from faults. 4 figs.

  17. Force Control and Nonlinear Master-Slave Force Profile to Manage an Admittance Type Multi-Fingered Haptic User Interface

    SciTech Connect (OSTI)

    Anthony L. Crawford

    2012-08-01

    Natural movements and force feedback are important elements in using teleoperated equipment if complex and speedy manipulation tasks are to be accomplished in remote and/or hazardous environments, such as hot cells, glove boxes, decommissioning, explosives disarmament, and space to name a few. In order to achieve this end the research presented in this paper has developed an admittance type exoskeleton like multi-fingered haptic hand user interface that secures the users palm and provides 3-dimensional force feedback to the users fingertips. Atypical to conventional haptic hand user interfaces that limit themselves to integrating the human hands characteristics just into the systems mechanical design this system also perpetuates that inspiration into the designed user interfaces controller. This is achieved by manifesting the property differences of manipulation and grasping activities as they pertain to the human hand into a nonlinear master-slave force relationship. The results presented in this paper show that the admittance-type system has sufficient bandwidth that it appears nearly transparent to the user when the user is in free motion and when the system is subjected to a manipulation task, increased performance is achieved using the nonlinear force relationship compared to the traditional linear scaling techniques implemented in the vast majority of systems.

  18. Implementation of basic studies in the ecological restoration of surface-mined land

    SciTech Connect (OSTI)

    Tischew, S.; Kirmer, A.

    2007-06-15

    This paper focuses on attempts to encourage a new state of the art in the ecological restoration of surface-mined land in Germany. On most of these sites, the application of traditional recultivation methods often destroys valuable ecological potential by leveling of the surface, ameliorating of nutrient-poor substrates, and seeding or planting of species not suited to the present habitat conditions. Many studies have shown that even highly disturbed ecosystems, such as large mining areas, can regenerate spontaneously over long-term periods. Colonization processes were influenced by the availability of diaspore sources as well as the suitability of sites for establishment. The predictability of succession could be improved by the identification of switch points in successional pathways depending on age and conditions of the sites. Based on the developmental potential, orientation by nature and biodiversity are selected as main targets for priority areas for nature conservation in mining sites. On priority areas restoration measures must be restricted to the use of near-natural methods (e.g., application of fresh, diaspore-rich plant clipping material, dumping of overburden with seed bank and vegetative propagules, seeding of site-specific, local seed mixtures) that are very successful in preventing erosion and accelerating vegetation development. Despite the success of these methods, the transfer of knowledge between scientists, practitioners, and administrative organizations has proved to be insufficient. Therefore, one of the main tasks in ecological restoration must be the inclusion of all stakeholders involved in decision-making processes and the establishment of a network of excellence to enhance the exchange of knowledge.

  19. Task Order Price Evaluation Worksheet for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Order Price Evaluation Worksheet for ESPCs Task Order Price Evaluation Worksheet for ESPCs Document lists a series of site-specific proposal data questions to answer for a task order. Download the Task Order Price Evaluation Worksheet. (73 KB) More Documents & Publications Task Order Price Evaluation Worksheet for Super ESPC Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) ESPC Task Order Financial Schedules (IDIQ Attachment J-6)

  20. Air Force Renewable Energy Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation covers Air Force Renewable Energy Programs and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  1. Force As A Momentum Current

    SciTech Connect (OSTI)

    Munera, Hector A.

    2010-07-28

    Advantages of a neo-Cartesian approach to classical mechanics are noted. If conservation of linear momentum is the fundamental principle, Newton's three laws become theorems. A minor paradox in static Newtonian mechanics is identified, and solved by reinterpreting force as a current of momentum. Contact force plays the role of a mere midwife in the exchange of momentum; however, force cannot be eliminated from physics because it provides the numerical value for momentum current. In this sense, in a neo-Cartesian formulation of mechanics the concept of force becomes strengthened rather than weakened.

  2. Continuous Forcing Data, Darwin, Australia

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jakob, Christian

    2010-09-22

    Long term, large scale continuous forcing data set for three complete wet seasons (2004-2005, 2005-2006 and 2006-2007) in Darwin, Australia.

  3. Continuous Forcing Data, Darwin, Australia

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jakob, Christian

    Long term, large scale continuous forcing data set for three complete wet seasons (2004-2005, 2005-2006 and 2006-2007) in Darwin, Australia.

  4. Sensing mode atomic force microscope

    DOE Patents [OSTI]

    Hough, Paul V. C.; Wang, Chengpu

    2006-08-22

    An atomic force microscope is described having a cantilever comprising a base and a probe tip on an end opposite the base; a cantilever drive device connected to the base; a magnetic material coupled to the probe tip, such that when an incrementally increasing magnetic field is applied to the magnetic material an incrementally increasing force will be applied to the probe tip; a moveable specimen base; and a controller constructed to obtain a profile height of a specimen at a point based upon a contact between the probe tip and a specimen, and measure an adhesion force between the probe tip and the specimen by, under control of a program, incrementally increasing an amount of a magnetic field until a release force, sufficient to break the contact, is applied. An imaging method for atomic force microscopy involving measuring a specimen profile height and adhesion force at multiple points within an area and concurrently displaying the profile and adhesion force for each of the points is also described. A microscope controller is also described and is constructed to, for a group of points, calculate a specimen height at a point based upon a cantilever deflection, a cantilever base position and a specimen piezo position; calculate an adhesion force between a probe tip and a specimen at the point by causing an incrementally increasing force to be applied to the probe tip until the probe tip separates from a specimen; and move the probe tip to a new point in the group.

  5. Sensing mode atomic force microscope

    DOE Patents [OSTI]

    Hough, Paul V.; Wang, Chengpu

    2004-11-16

    An atomic force microscope is described having a cantilever comprising a base and a probe tip on an end opposite the base; a cantilever drive device connected to the base; a magnetic material coupled to the probe tip, such that when an incrementally increasing magnetic field is applied to the magnetic material an incrementally increasing force will be applied to the probe tip; a moveable specimen base; and a controller constructed to obtain a profile height of a specimen at a point based upon a contact between the probe tip and a specimen, and measure an adhesion force between the probe tip and the specimen by, under control of a program, incrementally increasing an amount of a magnetic field until a release force, sufficient to break the contact, is applied. An imaging method for atomic force microscopy involving measuring a specimen profile height and adhesion force at multiple points within an area and concurrently displaying the profile and adhesion force for each of the points is also described. A microscope controller is also described and is constructed to, for a group of points, calculate a specimen height at a point based upon a cantilever deflection, a cantilever base position and a specimen piezo position; calculate an adhesion force between a probe tip and a specimen at the point by causing an incrementally increasing force to be applied to the probe tip until the probe tip separates from a specimen; and move the probe tip to a new point in the group.

  6. Interactive long-term simulation for power system restoration planning

    SciTech Connect (OSTI)

    Fountas, N.A.; Hatziargyriou, N.D. [National Technical Univ., Athens (Greece)] [National Technical Univ., Athens (Greece); Orfanogiannis, C.; Tasoulis, A. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

    1997-02-01

    The problem of restoring a power system following a complete blackout is complex and multi-faceted. Many control actions have to be performed on time, while constraints such as power balance and system stability have to be carefully respected. In this paper, the application of long-term dynamic analysis in studying frequency and voltage responses due to load and generation mismatches in isolated systems or during extension of the existing system in the restoration phase is presented. Simulation results covering the main steps of the Hellenic power system restoration process following a recent total blackout are presented and discussed.

  7. Environmental Restoration Remedial Action Quality Assurance Requirements Document

    SciTech Connect (OSTI)

    Cote, R.F.

    1991-09-01

    The Environmental Restoration Remedial Action Quality Assurance Requirements Document defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. 18 refs.

  8. Task Order Awarded for Environmental Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for environmental technical services to Professional Project Services, Inc., of Oak Ridge, TN, for support services at the Paducah Gaseous Diffusion Plant located near Paducah, KY.

  9. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    SciTech Connect (OSTI)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  10. Secretary Chu: President's Energy Budget Creates Jobs, Restores America's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Scientific Leadership and Puts Nation on the Path to Energy Independence | Department of Energy Chu: President's Energy Budget Creates Jobs, Restores America's Scientific Leadership and Puts Nation on the Path to Energy Independence Secretary Chu: President's Energy Budget Creates Jobs, Restores America's Scientific Leadership and Puts Nation on the Path to Energy Independence May 7, 2009 - 12:00am Addthis Washington D.C. --- U.S. Energy Secretary Steven Chu today detailed President Barack

  11. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  12. Energy Department and Federal Efforts to Support Utility Power Restoration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efforts | Department of Energy Federal Efforts to Support Utility Power Restoration Efforts Energy Department and Federal Efforts to Support Utility Power Restoration Efforts October 31, 2012 - 5:19pm Addthis 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of

  13. DOE model conference on waste management and environmental restoration

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  14. Supplemental site inspection for Air Force Plant 59, Johnson City, New York, Volume 3: Appendices F-Q

    SciTech Connect (OSTI)

    Nashold, B.; Rosenblatt, D.; Hau, J.

    1995-08-01

    This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earlier investigations. This volume consists of appendices F-Q, which contain the analytical data from the site characterization.

  15. NREL Job Task Analysis: Retrofit Installer Technician | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Retrofit Installer Technician A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence. 51671.pdf (341.28 KB) More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician (Revised) NREL Job Task Analysis: Energy Auditor NREL Job Task Analysis: Quality Control Inspector

  16. FAQS Job Task Analyses - Safeguards and Security General Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Security General Technical Base FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a...

  17. H2FIRST Hydrogen Contaminant Detector Task: Requirements Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Contaminant Detector Task Requirements Document and Market Survey Danny Terlip, ... California 94550 www.sandia.gov H2FIRST Hydrogen Contaminant Detector Task Requirements ...

  18. Descriptions of ESPC Task Order Schedules and Placement of Pricing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Document provides task order ...

  19. FAQS Job Task Analyses - Fire Protection Engineering | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fire Protection Engineering FAQS Job Task Analyses - Fire Protection Engineering FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job ...

  20. U.S. Support Program tasks

    SciTech Connect (OSTI)

    Langner, D.G.

    1998-09-01

    In the fall of 1993, President Clinton announced before the United Nations General Assembly, that the US would voluntarily offer excess fissile material of weapons origin to International Atomic Energy Agency (IAEA) safeguards. There are presently five US Support Program tasks at work. Three are complete, and two are underway. Reports are available from two of the completed SP-1s; a draft is in preparation for the third. These tasks are: (1) plutonium scrap multiplicity counter at Hanford; (2) calorimeter authentication at Hanford; (3) large neutron multiplicity counter at Rocky Flats; (4) calorimeter authentication at Rocky Flats; and (5) safeguards approach support at the APSF, SRS. The status of the first four tasks above is described here. Information on the work at Savannah River is contained in a separate paper.

  1. Incorporating Biodiversity Considerations Into Environmental...

    Office of Environmental Management (EM)

    Habitat Evaluation: Guidance for the Review of Environmental Impact Assessment Documents (EPA, 1993) Final Gulf Coast Ecosystem Restoration Task Force Strategic Plan Our Commitment ...

  2. A general protocol for restoration of entire river catchments

    SciTech Connect (OSTI)

    Stanford, J.A.; Frissell, C.A.; Ward, J.V.; Coutant, C.C.; Williams, R.N.; Lichatowich, J.A.

    1996-05-28

    Large catchment basins may be viewed as ecosystems with interactive natural and cultural attributes. Stream regulation severs ecological connectivity between channels and flood plains by reducing the range of natural flow and temperature variation, reduces the capacity of the ecosystem to sustain native biodiversity and bioproduction and promotes proliferation of non-native biota. However, regulated rivers regain normative attributes, which promote recovery of native biota, as distance from the dam increases and in relation to the mode of regulation. Therefore, reregulation of flow and temperature to normative pattern, coupled with elimination of pollutants and constrainment of nonnative biota, can naturally restore damaged habitats from headwaters to mouth. The expectation is rapid recovery of depressed populations of native species. The protocol requires: restoration of seasonal temperature patterns; restoration of peak flows needed to reconnect and periodically reconfigure channel and floodplain habitats; stabilization of base flows to revitalize the shallow water habitats; maximization of dam passage to allow restoration of metapopulation structure; change in the management belief system to rely on natural habitat restoration as opposed to artificial propagation, installation of artificial instream structures (river engineering) and artificial food web control; and, practice of adaptive ecosystem management.

  3. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    SciTech Connect (OSTI)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  4. NREL Job Task Analysis: Crew Leader | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crew Leader NREL Job Task Analysis: Crew Leader A summary of job task analyses for the position of crew leader when conducting weatherization work on a residence. NREL Job Task Analysis: Crew Leader (284.29 KB) More Documents & Publications Training Self-Assessment NREL Job Task Analysis: Quality Control Inspector

  5. NREL Job Task Analysis: Energy Auditor | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Auditor NREL Job Task Analysis: Energy Auditor A summary of job task analyses for the position of energy auditor when evaluating a residence before and during weatherization work. NREL Job Task Analysis: Energy Auditor (352.27 KB) More Documents & Publications NREL Job Task Analysis: Quality Control Inspector Training Self-Assessment

  6. FAQS Job Task Analyses- NNSA Package Certification Engineer

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  7. FAQS Job Task Analyses- Electrical Systems and Safety Oversight

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  8. FAQS Job Task Analyses- Confinement Ventilation and Process Gas Treatment

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  9. FAQS Job Task Analyses- DOE Aviation Safety Officer

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  10. FAQS Job Task Analyses- Senior Technical Safety Manager

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  11. FAQS Job Task Analyses- Civil/Structural Engineering

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  12. FAQS Job Task Analyses- Nuclear Explosive Safety Study

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  13. FAQS Job Task Analyses- Safeguards and Security General Technical Base

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  14. Hangman Restoration Project Year-End Report FY2008.

    SciTech Connect (OSTI)

    Coeur d'Alene Tribe Department of Natural Resources.

    2008-11-12

    This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

  15. Initial validation of FORCE2

    SciTech Connect (OSTI)

    Burge, S.W.

    1991-06-01

    Erosion has been identified as one of the significant design issues in fluid beds. A cooperative R&D venture of industry, research, and government organizations was recently formed to meet the industry need for a better understanding of erosion in fluid beds. Research focussed on bed hydrodynamics, which are considered to be the primary erosion mechanism. As part of this work, ANL developed an analytical model (FLUFIX) for bed hydrodynamics. Partial validation was performed using data from experiments sponsored by the research consortium. Development of a three-dimensional fluid bed hydrodynamic model was part of Asea-Babcock`s in-kind contribution to the R&D venture. This model, FORCE2, was developed by Babcock & Wilcox`s Research and Development Division existing B&W program and on the gas-solids modeling and was based on an existing B&W program and on the gas-solids modeling technology developed by ANL and others. FORCE2 contains many of the features needed to model plant size beds and, therefore can be used along with the erosion technology to assess metal wastage in industrial equipment. As part of the development efforts, FORCE2 was partially validated using ANL`s two-dimensional model, FLUFIX, and experimental data. Time constraints as well as the lack of good hydrodynamic data, particularly at the plant scale, prohibited a complete validation of FORCE2. This report describes this initial validation of FORCE2.

  16. Sensing mode atomic force microscope

    DOE Patents [OSTI]

    Hough, Paul V. C.; Wang, Chengpu

    2003-01-01

    An atomic force microscope utilizes a pulse release system and improved method of operation to minimize contact forces between a probe tip affixed to a flexible cantilever and a specimen being measured. The pulse release system includes a magnetic particle affixed proximate the probe tip and an electromagnetic coil. When energized, the electromagnetic coil generates a magnetic field which applies a driving force on the magnetic particle sufficient to overcome adhesive forces exhibited between the probe tip and specimen. The atomic force microscope includes two independently displaceable piezo elements operable along a Z-axis. A controller drives the first Z-axis piezo element to provide a controlled approach between the probe tip and specimen up to a point of contact between the probe tip and specimen. The controller then drives the first Z-axis piezo element to withdraw the cantilever from the specimen. The controller also activates the pulse release system which drives the probe tip away from the specimen during withdrawal. Following withdrawal, the controller adjusts the height of the second Z-axis piezo element to maintain a substantially constant approach distance between successive samples.

  17. Environmental guidance for public participation in environmental restoration activities

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    The US Department of Energy (DOE) is issuing this document, entitled Guidance on Public Participation for US Department of Energy Environmental Restoration Activities, to summarize policy and provide guidance for public participation in environmental restoration activities at DOE Headquarters, Field Offices, facilities, and laboratories. While the Office of Environmental Restoration and Waste Management (EM) has environmental restoration responsibility for the majority of DOE sites and facilities, other DOE Project Offices have similar responsibilities at their sites and facilities. This guidance is applicable to all environment restoration activities conducted by or for DOE under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA); the Resource Conservation and Recovery Act of 1976 (RCRA) as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA) (corrective actions only); and the National Environmental Policy Act of 1969 (NEPA). This guidance also is applicable to CERCLA remedial action programs under the Uranium Mill Tailings Radiation Control Act of 1978 and the Formerly Utilized Sites Remedial Action Program, where DOE is the designated lead. The primary objectives of this guidance document are as follows: acclimate DOE staff to a changing culture that emphasizes the importance of public participation activities; provide direction on implementing these public participation activities; and, provide consistent guidance for all DOE Field Offices and facilities. The purpose of this document is to provide guidance on conducting effective public participation activities for environmental restoration activities under CERCLA; RCRA corrective actions under sections 3004(u), 3004(v), and 3008(h); and NEPA public participation activities.

  18. June 11, 2009, HSS/Union Task Meeting on 2009 HSS/Union Task Progress - Task Leads Schedule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    05-09 TASK PLAN/SCHEDULE I. TRAINING REQUIREMENTS A. Identify basic DOE site access requirements [Leads: NTC/SMWIA/HS-10] What are the common general training requirements necessary to work at DOE sites. Jul 09 - Oct 09 1. Collect data from existing resources; research successful models, determine application to DOE 2. Compare NTC site visit results 3. Develop general requirements findings proposal and a matrix of recommended coursework Dec 09 4. Identify process for

  19. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

  20. Materials and methods for autonomous restoration of electrical conductivity

    DOE Patents [OSTI]

    Blaiszik, Benjamin J; Odom, Susan A; Caruso, Mary M; Jackson, Aaron C; Baginska, Marta B; Ritchey, Joshua A; Finke, Aaron D; White, Scott R; Moore, Jeffrey S; Sottos, Nancy R; Braun, Paul V; Amine, Khalil

    2014-03-25

    An autonomic conductivity restoration system includes a solid conductor and a plurality of particles. The particles include a conductive fluid, a plurality of conductive microparticles, and/or a conductive material forming agent. The solid conductor has a first end, a second end, and a first conductivity between the first and second ends. When a crack forms between the first and second ends of the conductor, the contents of at least a portion of the particles are released into the crack. The cracked conductor and the released contents of the particles form a restored conductor having a second conductivity, which may be at least 90% of the first conductivity.

  1. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can ... to provide approval for NNSA work force restructurings in consultation with LM 501 ...

  2. FAQS Job Task Analyses - Instrument and Controls | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Instrument and Controls FAQS Job Task Analyses - Instrument and Controls FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies. FAQS JTA - Instrument and

  3. Automatic HTS force measurement instrument

    DOE Patents [OSTI]

    Sanders, Scott T.; Niemann, Ralph C.

    1999-01-01

    A device for measuring the levitation force of a high temperature superconductor sample with respect to a reference magnet includes a receptacle for holding several high temperature superconductor samples each cooled to superconducting temperature. A rotatable carousel successively locates a selected one of the high temperature superconductor samples in registry with the reference magnet. Mechanism varies the distance between one of the high temperature superconductor samples and the reference magnet, and a sensor measures levitation force of the sample as a function of the distance between the reference magnet and the sample. A method is also disclosed.

  4. Automatic HTS force measurement instrument

    DOE Patents [OSTI]

    Sanders, S.T.; Niemann, R.C.

    1999-03-30

    A device is disclosed for measuring the levitation force of a high temperature superconductor sample with respect to a reference magnet includes a receptacle for holding several high temperature superconductor samples each cooled to superconducting temperature. A rotatable carousel successively locates a selected one of the high temperature superconductor samples in registry with the reference magnet. Mechanism varies the distance between one of the high temperature superconductor samples and the reference magnet, and a sensor measures levitation force of the sample as a function of the distance between the reference magnet and the sample. A method is also disclosed. 3 figs.

  5. Final report on the Pathway Analysis Task

    SciTech Connect (OSTI)

    Whicker, F.W.; Kirchner, T.B.

    1993-04-01

    The Pathway Analysis Task constituted one of several multi-laboratory efforts to estimate radiation doses to people, considering all important pathways of exposure, from the testing of nuclear devices at the Nevada Test Site (NTS). The primary goal of the Pathway Analysis Task was to predict radionuclide ingestion by residents of Utah, Nevada, and portions of seven other adjoining western states following radioactive fallout deposition from individual events at the NTS. This report provides comprehensive documentation of the activities and accomplishments of Colorado State University`s Pathway Analysis Task during the entire period of support (1979--91). The history of the project will be summarized, indicating the principal dates and milestones, personnel involved, subcontractors, and budget information. Accomplishments, both primary and auxiliary, will be summarized with general results rather than technical details being emphasized. This will also serve as a guide to the reports and open literature publications produced, where the methodological details and specific results are documented. Selected examples of results on internal dose estimates are provided in this report because the data have not been published elsewhere.

  6. Casimir force in absorbing multilayers

    SciTech Connect (OSTI)

    Tomas, M.S.

    2002-11-01

    The Casimir effect in a dispersive and absorbing multilayered system is considered adopting the (net) vacuum-field pressure point of view to the Casimir force. Using the properties of the macroscopic field operators appropriate for absorbing systems and a convenient compact form of the Green function for a multilayer, a straightforward and transparent derivation of the Casimir force in a lossless layer of an otherwise absorbing multilayer is presented. The resulting expression, in terms of the reflection coefficients of the surrounding stacks of layers, is of the same form as that obtained by Zhou and Spruch for a purely dispersive multilayer using the (surface) mode summation method [Phys. Rev. A 52, 297 (1995)]. Owing to the recursion relations that the generalized Fresnel coefficients satisfy, this result can be applied to more complex systems with planar symmetry. This is illustrated by calculating the Casimir force on a dielectric (metallic) slab in a planar cavity with realistic mirrors. Also, a relationship between the Casimir force and energy in two different layers is established.

  7. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect (OSTI)

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  8. Environmental Restoration Program Roadmap: Strategic program plan. Addendum 1

    SciTech Connect (OSTI)

    1992-12-11

    This Addendum to the Portsmouth (PORTS) Environmental Restoration (ER) Roadmap expands on the FY 1992 strategic plan for PORTS by providing human resource loading, ADS linkages to resolution activities, and technology development information. Each of these topics is presented in a separate section.

  9. Microbial diversity in restored wetlands of San Francisco Bay

    SciTech Connect (OSTI)

    Theroux, Susanna; Hartman, Wyatt; He, Shaomei; Tringe, Susannah

    2013-12-09

    Wetland ecosystems may serve as either a source or a sink for atmospheric carbon and greenhouse gases. This delicate carbon balance is influenced by the activity of belowground microbial communities that return carbon dioxide and methane to the atmosphere. Wetland restoration efforts in the San Francisco Bay-Delta region may help to reverse land subsidence and possibly increase carbon storage in soils. However, the effects of wetland restoration on microbial communities, which mediate soil metabolic activity and carbon cycling, are poorly studied. In an effort to better understand the underlying factors which shape the balance of carbon flux in wetland soils, we targeted the microbial communities in a suite of restored and historic wetlands in the San Francisco Bay-Delta region. Using DNA and RNA sequencing, coupled with greenhouse gas monitoring, we profiled the diversity and metabolic potential of the wetland soil microbial communities along biogeochemical and wetland age gradients. Our results show relationships among geochemical gradients, availability of electron acceptors, and microbial community composition. Our study provides the first genomic glimpse into microbial populations in natural and restored wetlands of the San Francisco Bay-Delta region and provides a valuable benchmark for future studies.

  10. Task 8 - Management and Reporting. Semiannual report, November 1, 1996--March 31, 1997

    SciTech Connect (OSTI)

    Daly, Daniel J.; Erickson, Thomas A.

    1997-12-31

    The task of restoring nuclear defense complex sites under the U.S. Department of Energy (DOE) Environmental Management (EM) Program presents an unprecedented challenge to the environmental restoration community. Effective and efficient cleanup requires the timely development or modification of novel cleanup technologies applicable to radioactive wastes. Fostering the commercialization of these innovative technologies is the mission of EM-5O, the EM Program Office of Science and Technology. DOE`s Federal Energy Technology Center (FETC) pursues activities integral to the EM-5O mission through its Cooperative Agreement with the EM Office of Science and Technology. On the road to commercialization, innovative technologies must overcome significant barriers with respect to technical issues, proof of performance, partnering, capitalization, and regulatory acceptance. The Energy {ampersand} Environmental Research Center (EERC), a not for profit, contract supported organization focused on research, development, demonstration, and commercialization (RDD{ampersand}C) of energy and environmental technologies, has entered the third year of a Cooperative Agreement with FETC designed to (1) overcome key barriers through technical support, real world demonstrations, and partnering; and (2) support the integration and deployment of winner technologies at EM sites. These activities, along with program management, make up the program areas of the FETC- EERC EM Cooperative Agreement (EMCA): Technology Commercialization, Technology Integration, and Management and Reporting.

  11. Solvent-induced forces in protein folding

    SciTech Connect (OSTI)

    Ben-Naim, A. (Hebrew Univ., Jerusalem (Israel))

    1990-08-23

    The solvent-induced forces between various groups on the protein are examined. It is found that the intramolecular hydrophilic forces are likely to be the strongest forces mediated through the solvent. It is argued that these are probably the most important solvent-induced driving forces in the process of protein folding.

  12. NREL Job Task Analysis: Crew Leader

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crew Leader Chuck Kurnik National Renewable Energy Laboratory Cynthia Woodley Professional Testing Inc. Technical Report NREL/TP-7A20-51673 May 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 NREL Job Task Analysis: Crew Leader Chuck

  13. H2FIRST Reference Station Design Task: Project Deliverable 2...

    Energy Savers [EERE]

    Reference Station Design Task: Project Deliverable 2-2 H2FIRST Reference Station Design Task: Project Deliverable 2-2 This H2FIRST project report, published in April 2015, presents ...

  14. Task Order Awarded for Moab Uranium Mill Tailings Remedial Action...

    Office of Environmental Management (EM)

    Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On ...

  15. DOE Awards Research and Systems Engineering Task Order | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Systems Engineering Task Order DOE Awards Research and Systems Engineering Task Order March 28, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 ...

  16. NREL Job Task Analysis: Quality Control Inspector | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control Inspector NREL Job Task Analysis: Quality Control Inspector A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence. NREL Job Task Analysis: Quality Control Inspector (332.56 KB) More Documents & Publications Training Self-Assessment Preparing for the Quality Control Inspector Certification Exam NREL Job Task Analysis: Energy Auditor

  17. NREL Job Task Analysis: Retrofit Installer Technician (Revised) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Retrofit Installer Technician (Revised) NREL Job Task Analysis: Retrofit Installer Technician (Revised) A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence. retrofit_installer_jta_04112012.pdf (518.38 KB) More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Energy Auditor Training Self-Assessment

  18. NREL Job Task Analysis: Retrofit Installer Technician (Revised)

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2012-04-01

    A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

  19. Employee Job Task Analysis (EJTA) PIA, Richland Operations Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office (58.17 KB) More Documents & Publications Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Injury & Illness System (01&15) PIA, Idaho National Laboratory PIA - GovTrip (DOE data)

  20. Kelvin Probe Force Microscopy in liquid using Electrochemical Force Microscopy

    SciTech Connect (OSTI)

    Collins, Liam; Jesse, Stephen; Kilpatrick, J.; Tselev, Alexander; Okatan, Mahmut Baris; Kalinin, Sergei V.; Rodriguez, Brian

    2015-01-01

    Conventional closed loop-Kelvin probe force microscopy (KPFM) has emerged as a powerful technique for probing electric and transport phenomena at the solid-gas interface. The extension of KPFM capabilities to probe electrostatic and electrochemical phenomena at the solid–liquid interface is of interest for a broad range of applications from energy storage to biological systems. However, the operation of KPFM implicitly relies on the presence of a linear lossless dielectric in the probe-sample gap, a condition which is violated for ionically-active liquids (e.g., when diffuse charge dynamics are present). Here, electrostatic and electrochemical measurements are demonstrated in ionically-active (polar isopropanol, milli-Q water and aqueous NaCl) and ionically-inactive (non-polar decane) liquids by electrochemical force microscopy (EcFM), a multidimensional (i.e., bias- and time-resolved) spectroscopy method. In the absence of mobile charges (ambient and non-polar liquids), KPFM and EcFM are both feasible, yielding comparable contact potential difference (CPD) values. In ionically-active liquids, KPFM is not possible and EcFM can be used to measure the dynamic CPD and a rich spectrum of information pertaining to charge screening, ion diffusion, and electrochemical processes (e.g., Faradaic reactions). EcFM measurements conducted in isopropanol and milli-Q water over Au and highly ordered pyrolytic graphite electrodes demonstrate both sample- and solvent-dependent features. Finally, the feasibility of using EcFM as a local force-based mapping technique of material-dependent electrostatic and electrochemical response is investigated. The resultant high dimensional dataset is visualized using a purely statistical approach that does not require a priori physical models, allowing for qualitative mapping of electrostatic and electrochemical material properties at the solid–liquid interface.

  1. Kelvin Probe Force Microscopy in liquid using Electrochemical Force Microscopy

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Collins, Liam; Jesse, Stephen; Kilpatrick, J.; Tselev, Alexander; Okatan, Mahmut Baris; Kalinin, Sergei V.; Rodriguez, Brian

    2015-01-01

    Conventional closed loop-Kelvin probe force microscopy (KPFM) has emerged as a powerful technique for probing electric and transport phenomena at the solid-gas interface. The extension of KPFM capabilities to probe electrostatic and electrochemical phenomena at the solid–liquid interface is of interest for a broad range of applications from energy storage to biological systems. However, the operation of KPFM implicitly relies on the presence of a linear lossless dielectric in the probe-sample gap, a condition which is violated for ionically-active liquids (e.g., when diffuse charge dynamics are present). Here, electrostatic and electrochemical measurements are demonstrated in ionically-active (polar isopropanol, milli-Q watermore » and aqueous NaCl) and ionically-inactive (non-polar decane) liquids by electrochemical force microscopy (EcFM), a multidimensional (i.e., bias- and time-resolved) spectroscopy method. In the absence of mobile charges (ambient and non-polar liquids), KPFM and EcFM are both feasible, yielding comparable contact potential difference (CPD) values. In ionically-active liquids, KPFM is not possible and EcFM can be used to measure the dynamic CPD and a rich spectrum of information pertaining to charge screening, ion diffusion, and electrochemical processes (e.g., Faradaic reactions). EcFM measurements conducted in isopropanol and milli-Q water over Au and highly ordered pyrolytic graphite electrodes demonstrate both sample- and solvent-dependent features. Finally, the feasibility of using EcFM as a local force-based mapping technique of material-dependent electrostatic and electrochemical response is investigated. The resultant high dimensional dataset is visualized using a purely statistical approach that does not require a priori physical models, allowing for qualitative mapping of electrostatic and electrochemical material properties at the solid–liquid interface.« less

  2. Task Decomposition in Human Reliability Analysis

    SciTech Connect (OSTI)

    Boring, Ronald Laurids; Joe, Jeffrey Clark

    2014-06-01

    In the probabilistic safety assessments (PSAs) used in the nuclear industry, human failure events (HFEs) are determined as a subset of hardware failures, namely those hardware failures that could be triggered by human action or inaction. This approach is top-down, starting with hardware faults and deducing human contributions to those faults. Elsewhere, more traditionally human factors driven approaches would tend to look at opportunities for human errors first in a task analysis and then identify which of those errors is risk significant. The intersection of top-down and bottom-up approaches to defining HFEs has not been carefully studied. Ideally, both approaches should arrive at the same set of HFEs. This question remains central as human reliability analysis (HRA) methods are generalized to new domains like oil and gas. The HFEs used in nuclear PSAs tend to be top-down— defined as a subset of the PSA—whereas the HFEs used in petroleum quantitative risk assessments (QRAs) are more likely to be bottom-up—derived from a task analysis conducted by human factors experts. The marriage of these approaches is necessary in order to ensure that HRA methods developed for top-down HFEs are also sufficient for bottom-up applications.

  3. Employee Job Task Analysis (EJTA) - HPMC Occupational Health Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Occupational Health Services > Employee Job Task Analysis (EJTA) Occupational Health Services Behavioral Health Services Beryllium Beryllium-Associated Worker Registry Employee Job Task Analysis (EJTA) Environmental Management System (EMS) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Return to Work Risk Communication Employee Job Task Analysis (EJTA) Email Email Page | Print Print Page | Text Increase

  4. Richland Environmental Restoration Project management action process document

    SciTech Connect (OSTI)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  5. Assessment and evaluation of technologies for environmental restoration. Progress report

    SciTech Connect (OSTI)

    Uzochukwu, G.A.

    1999-01-15

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  6. Assessment and evaluation of technologies for environmental restoration. Progress report

    SciTech Connect (OSTI)

    Uzochukwu, G. A.

    2000-06-30

    Nuclear and commercial non-nuclear technologies that have the potential of meeting the environmental restoration objectives of the Department of Energy are being evaluated. A detailed comparison of innovative technologies available will be performed to determine the safest and most economical technology for meeting these objectives. Information derived from this effort will be matched with the multi-objective of the environmental restoration effort to ensure that the best, most economical, and the safest technologies are used in decision making at USDOE-SRS. Technology-related variables will be developed and the resulting data formatted and computerized for multimedia systems. The multimedia system will be made available to technology developers and evaluators to ensure that the safest and most economical technologies are developed for use at SRS and other DOE sites.

  7. Two decades of prairie restoration at Fermilab, Batavia, Illinois

    SciTech Connect (OSTI)

    Betz, R.F.; Lootens, R.J.; Becker, M.K.

    1996-12-31

    Successional Restoration is the method being used to restore the prairie at Fermilab on the former agricultural fields. This involves an initial planting, using aggressive species that have wide ecological tolerances which will grow well on abandoned agricultural fields. Collectively, these species are designated as the prairie matrix. The species used for this prairie matrix compete with and eventually eliminate most weedy species. They also provide an adequate fuel load capable of sustaining a fire within a few years after a site has been initially planted. Associated changes in the biological and physical structure of the soil help prepare the way for the successful introduction of plants of the later successional species. Only after the species of the prairie matrix are well established, is the species diversity increased by introducing species with narrower ecological tolerances. These species are thus characteristic of the later successional stages.

  8. Hickam Air Force Base | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Validation » Hickam Air Force Base Hickam Air Force Base Photo of hybrid fuel cell bus at Hickam Air Force Base Hickam Air Force Base spans 2,850 acres in Honolulu, Hawaii. The military base is home to the 15th Airlift Wing, the Hawaii Air National Guard, and the Pacific Air Forces headquarters. With support from the Hawaii Center for Advanced Transportation Technologies and the Air Force Advanced Power Technology Office, Hickam added a fuel cell hybrid electric bus to its fleet in

  9. Restoration of surface-mined lands with rainfall harvesting

    SciTech Connect (OSTI)

    Sauer, R.H.; Rickard, W.H.

    1982-12-01

    Strip mining for coal in the arid western US will remove grazing land as energy demands are met. Conventional resotration usually includes leveling the spoil banks and covering them with top soil, fertilizing, seeding and irrigation with well or river water. An overview of research on an alternate method of restoring this land is reported. From 1976 through 1981 studies were conducted on the use of water harvesting, the collection and use of rainfall runoff, to restore the vegetative productivity of strip mined lands in arid regions. These studies tested the technical and economic feasibility of using partially leveled spoil banks at strip mines as catchment areas to collect and direct runoff to the topsoiled valley floor where crops were cultivated. Information was collected on the efficiency of seven treatments to increase runoff from the catchment areas and on the productivity of seven crops. The experiments were conducted in arid areas of Washington, Arizona, and Colorado. It was concluded that water harvesting can replace or augment expensive and inadequate supplies of well and river water in arid regions with a suitable climate. These studies showed that some treatments provided adequate runoff to produce a useful crop in the valleys, thus making this alternative approach to restoration technically feasible. This approach was also potentially economically feasible where the treatment costs of the catchment areas were low, the treatment was effective, the crop was productive and valuable, and earthmoving costs were lower than with conventional restoration involving complete leveling of spoil banks. It was also concluded that water harvesting can be made more effective with further information on catchment area treatments, which crops are most adaptable to water harvesting, the optimum incline of the catchment areas and climatic influences on water harvesting.

  10. Nevada Environmental Restoration Project Amchitka Mud Pit Sites

    Office of Legacy Management (LM)

    Amchitka Mud Pit Sites 2006 Post-Closure Monitoring and Inspection Report Amchitka Island, Alaska Revision No.: 0 September 2006 Environmental Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office, Available for public sale, in paper, from: U.S. Department of Cornrn&ce National Technical Information Service 5285 Port Royal Road Springfield, VA 22 1 6 1 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis. aov Online ordering:

  11. Nevada Environmental Restoration Project Natfonal Nuclenr Security Adminlstratlon

    Office of Legacy Management (LM)

    Natfonal Nuclenr Security Adminlstratlon Amchitka Island Surface Closure Report Revision No.: 1 July 2003 Approved for public release; further dissemination unlimited. Environmental Restoration L Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22 16 1 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@,ntis,fedworld.~ov Online ordering: htt~:/hZww.ntis.~ov/ordering. htm Available electronically at

  12. Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year-in-Review: 2010 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S. Department of Energy August 2011 OE/ISER Report 8/31/11 i For Further Information This report was prepared by the Office of Electricity Delivery and Energy Reliability under the direction of Patricia Hoffman, Assistant Secretary, and William Bryan, Deputy Assistant Secretary. Specific questions about information in this report

  13. Spectral restoration in high resolution electron energy loss spectroscopy based on iterative semi-blind Lucy-Richardson algorithm applied to rutile surfaces

    SciTech Connect (OSTI)

    Lazzari, Rmi Li, Jingfeng Jupille, Jacques

    2015-01-15

    A new spectral restoration algorithm of reflection electron energy loss spectra is proposed. It is based on the maximum likelihood principle as implemented in the iterative Lucy-Richardson approach. Resolution is enhanced and point spread function recovered in a semi-blind way by forcing cyclically the zero loss to converge towards a Dirac peak. Synthetic phonon spectra of TiO{sub 2} are used as a test bed to discuss resolution enhancement, convergence benefit, stability towards noise, and apparatus function recovery. Attention is focused on the interplay between spectral restoration and quasi-elastic broadening due to free carriers. A resolution enhancement by a factor up to 6 on the elastic peak width can be obtained on experimental spectra of TiO{sub 2}(110) and helps revealing mixed phonon/plasmon excitations.

  14. Geothermal Well Site Restoration and Plug and Abandonment of Wells

    SciTech Connect (OSTI)

    Rinehart, Ben N.

    1994-08-01

    A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana-the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete, utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports and procedures, daily workover and current conditions report, and cost and salvage reports. Site locations, grid maps, and photographs are provided.

  15. Restoration and analysis of amateur movies from the Kennedy assassination

    SciTech Connect (OSTI)

    Breedlove, J.R.; Cannon, T.M.; Janney, D.H.; Kruger, R.P.; Trussell, H.J.

    1980-01-01

    Much of the evidence concerning the assassination of President Kennedy comes from amateur movies of the presidential motorcade. Two of the most revealing movies are those taken by the photographers Zapruder and Nix. Approximately 180 frames of the Zapruder film clearly show the general relation of persons in the presidential limousine. Many of the frames of interest were blurred by focus problems or by linear motion. The method of cepstral analysis was used to quantitatively measure the blur, followed by maximum a posteriori (MAP) restoration. Descriptions of these methods, complete with before-and-after examples from selected frames are given. The frames were then available for studies of facial expressions, hand motions, etc. Numerous allegations charge that multiple gunmen played a role in an assassination plot. Multispectral analyses, adapted from studies of satellite imagery, show no evidence of an alleged rifle in the Zapruder film. Lastly, frame-averaging is used to reduce the noise in the Nix movie prior to MAP restoration. The restoration of the reduced-noise average frame more clearly shows that at least one of the alleged gunmen is only the light-and-shadow pattern beneath the trees.

  16. Proceedings of the Columbia River Estuary Conference on Ecosystem Restoration.

    SciTech Connect (OSTI)

    U.S. Bonneville Power Administration

    2008-08-01

    The 2008 Columbia River Estuary Conference was held at the Liberty Theater in Astoria, Oregon, on April 19-20. The conference theme was ecosystem restoration. The purpose of the conference was to exchange data and information among researchers, policy-makers, and the public, i.e., interrelate science with management. Conference organizers invited presentations synthesizing material on Restoration Planning and Implementation (Session 1), Research to Reduce Restoration Uncertainties (Session 2), Wetlands and Flood Management (Session 3), Action Effectiveness Monitoring (Session 4), and Management Perspectives (Session 5). A series of three plenary talks opened the conference. Facilitated speaker and audience discussion periods were held at the end of each session. Contributed posters conveyed additional data and information. These proceedings include abstracts and notes documenting questions from the audience and clarifying answers from the presenter for each talk. The proceedings also document key points from the discussion periods at the end of each session. The conference program is outlined in the agenda section. Speaker biographies are presented in Appendix A. Poster titles and authors are listed in Appendix B. A list of conference attendees is contained in Appendix C.

  17. Vehicle routing for the last mile of power system restoration

    SciTech Connect (OSTI)

    Bent, Russell W; Coffrin, Carleton; Van Hentenryck, Pascal

    2010-11-23

    This paper studied a novel problem in power system restoration: the Power Restoration Vehicle Routing Problem (PRVRP). The goal of PRVRPs is to decide how coordinate repair crews effectively in order to recover from blackouts as fast as possible after a disaster has occurred. PRVRPs are complex problems that combine vehicle routing and power restoration scheduling problems. The paper proposed a multi-stage optimization algorithm based on the idea of constraint injection that meets the aggressive runtime constraints necessary for disaster recovery. The algorithms were validated on benchmarks produced by the Los Alamos National Laboratory, using the infrastructure of the United States. The disaster scenarios were generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. Experimental results show that the constraint-injection algorithms can reduce the blackouts by 50% or more over field practices. Moreover, the results show that the constraint-injection algorithm using large neighborhood search over a blackbox simulator provide competitive quality and scales better than using a MIP solver on the subproblems.

  18. SAVANNAH RIVER SITE FORCE REPORT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FORCE REPORT 3rd Quarter - FY 2016 Data Date:June 30, 2016 Feds/ Prime Contract 1st Tier Teaming Subs Staff Aug / Support Service Craft / Union Hall / Trades Part Time / Limited Service Site TOTAL Federal Organizations DOE-SR 269 7 62 - - 338 DOE-OIG-SR 15 1 - - - 16 NNSA-SRFO 24 1 - 25 NNSA APM 20 2 12 - - 34 NNSA NA-23 10 - 3 - - 13 EM Only Total 269 8 62 - - 339 NNSA Only Total 54 2 16 - - 72 Other Funding Total 15 - - - - 15 Federal Total 338 10 78 - - 426 SRS Contracts SRNS 4,644 - 359 317

  19. ARMY SERiWE FORCES

    Office of Legacy Management (LM)

    ' This doc~omnt consists tif-..$---..-- PaWs ?5-i3s4 " No.,J ______ d&---.copies. series.-f;;i, ' ARMY SERiWE FORCES UNITED STATES ' ENGINEER OFFICE MANHP.~AN Dwmtcr CHIWOO A\RU o,,,c* P. 0. 90x 3140 A CHICA so, ILrlNole 20 June 1945 F' '2 0 Subject: Licenae Agreement - International Pulverizing Corporation - Subcoritract #7401-37-82. To: The District~Eqinssr, U. S. Engineer Office, Manhattan District, Oak Ridge, Tennessee. Attention: Contract Section. As llsted'below, there are

  20. Link Force Holdings Ltd | Open Energy Information

    Open Energy Info (EERE)

    search Name: Link Force Holdings Ltd Place: China Product: China-based energy saving LED street light maker. References: Link Force Holdings Ltd1 This article is a stub. You...

  1. US Wind Force LLC | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: US Wind Force LLC Place: Wexford, Pennsylvania Zip: PA 15090-9 Sector: Wind energy Product: US Wind Force, LLC is an independent, privately...

  2. ESPC Success Story - Dyess Air Force Base

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DYESS AIR FORCE BASE DYESS, TEXAS Water Conservation and Green Energy ESPC SUCCESS STORY Dyess Air Force Base and surrounding west Texas has been under extreme-drought water ...

  3. U.S. Air Force (USAF) Air Force Research Laboratory (AFRL)

    Broader source: Energy.gov (indexed) [DOE]

    Benjamin Leever U.S. Air Force (USAF) Air Force Research Laboratory (AFRL) DOE - DoD ... level - Fourth level Fifth level - - - DOD Application Commercial Counterparts Sensor ...

  4. Task 3 - RMC method validation project report

    SciTech Connect (OSTI)

    Sarkinen, R.A.

    1996-08-01

    The EPRI Substation Reliability Centered Maintenance Project Task 3 uses utility data to validate the RCM process for maintenance in substations. At BPA, this project was used to validate the RCM method for a preventive maintenance program for substations. This project was performed by an RCM technical team and all maintenance personnel at the Chemawa Maintenance District Headquarters. The system chosen for, this project involved four transmission lines that feeds 230 kV Santiam Substation. This report explains the process for the system approach-used for the Santiam project and a summary of the results. The current preventive maintenance program is primarily based on time. The RCM approach for a preventive maintenance program realized significant savings.

  5. September 2012, Work Force Retention Work Group Status Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Force Retention Work Group Status Overview 2 Subgroups: Pro-Force and Non-Pro-Force Pro-Force Subgroup: Accomplishments: 1. Completion of 10 CFR 1046 Protective Force ...

  6. DESIGN AND CONSTRUCTION OF A FORCE-REFLECTING TELEOPERATION SYSTEM

    SciTech Connect (OSTI)

    M.A. Ebadian, Ph.D.

    1999-01-01

    For certain applications, such as space servicing, undersea operations, and hazardous material handling tasks in nuclear reactors, the environments can be uncertain, complex, and hazardous. Lives may be in danger if humans were to work under these conditions. As a result, a man-machine system--a teleoperator system--has been developed to work in these types of environments. In a typical teleoperator system, the actual system operates at a remote site; the operator located away from this system usually receives visual information from a video image and/or graphical animation on the computer screen. Additional feedback, such as aural and force information, can significantly enhance performance of the system. Force reflection is a type of feedback in which forces experienced by the remote manipulator are fed back to the manual controller. Various control methods have been proposed for implementation on a teleoperator system. In order to examine different control schemes, a one Degree-Of-Freedom (DOF) Force-Reflecting Manual Controller (FRMC) is constructed and integrated into a PC. The system parameters are identified and constructed as a mathematical model. The Proportional-Integral-Derivative (PID) and fuzzy logic controllers are developed and tested experimentally. Numerical simulation results obtained from the mathematical model are compared with those of experimental data for both types of controllers. In addition, the concept of a telesensation system is introduced. A telesensation system is an advanced teleoperator system that attempts to provide the operator with sensory feedback. In this context, a telesensation system integrates the use of a Virtual Reality (VR) unit, FRMC, and Graphical User Interface (GUI). The VR unit is used to provide the operator with a 3-D visual effect. Various commercial VR units are reviewed and features compared for use in a telesensation system. As for the FRMC, the conceptual design of a 3-DOF FRMC is developed in an effort to

  7. Micromechanism linear actuator with capillary force sealing

    DOE Patents [OSTI]

    Sniegowski, Jeffry J.

    1997-01-01

    A class of micromachine linear actuators whose function is based on gas driven pistons in which capillary forces are used to seal the gas behind the piston. The capillary forces also increase the amount of force transmitted from the gas pressure to the piston. In a major subclass of such devices, the gas bubble is produced by thermal vaporization of a working fluid. Because of their dependence on capillary forces for sealing, such devices are only practical on the sub-mm size scale, but in that regime they produce very large force times distance (total work) values.

  8. Electrostatic microvalves utilizing conductive nanoparticles for improved speed, lower power, and higher force actuation.

    SciTech Connect (OSTI)

    Ten Eyck, Gregory A.; Branson, Eric D.; Kenis, Paul J. A.; Desai, Amit; Schudel, Ben; Givler, Richard C.; Tice, Josh; Collord, Andrew; Apblett, Christopher Alan; Cook, Adam W.

    2009-09-01

    We have designed and built electrostatically actuated microvalves compatible with integration into a PDMS based microfluidic system. The key innovation for electrostatic actuation was the incorporation of carbon nanotubes into the PDMS valve membrane, allowing for electrostatic charging of the PDMS layer and subsequent discharging, while still allowing for significant distention of the valveseat for low voltage control of the system. Nanoparticles were applied to semi-cured PDMS using a stamp transfer method, and then cured fully to make the valve seats. DC actuation in air of these valves yielded operational voltages as low as 15V, by using a supporting structure above the valve seat that allowed sufficient restoring forces to be applied while not enhancing actuation forces to raise the valve actuation potential. Both actuate to open and actuate to close valves have been demonstrated, and integrated into a microfluidic platform, and demonstrated fluidic control using electrostatic valves.

  9. Hyperbaric Hydrothermal Atomic Force Microscope

    DOE Patents [OSTI]

    Knauss, Kevin G.; Boro, Carl O.; Higgins, Steven R.; Eggleston, Carrick M.

    2003-07-01

    A hyperbaric hydrothermal atomic force microscope (AFM) is provided to image solid surfaces in fluids, either liquid or gas, at pressures greater than normal atmospheric pressure. The sample can be heated and its surface imaged in aqueous solution at temperatures greater than 100.degree. C. with less than 1 nm vertical resolution. A gas pressurized microscope base chamber houses the stepper motor and piezoelectric scanner. A chemically inert, flexible membrane separates this base chamber from the sample cell environment and constrains a high temperature, pressurized liquid or gas in the sample cell while allowing movement of the scanner. The sample cell is designed for continuous flow of liquid or gas through the sample environment.

  10. Hyperbaric hydrothermal atomic force microscope

    DOE Patents [OSTI]

    Knauss, Kevin G.; Boro, Carl O.; Higgins, Steven R.; Eggleston, Carrick M.

    2002-01-01

    A hyperbaric hydrothermal atomic force microscope (AFM) is provided to image solid surfaces in fluids, either liquid or gas, at pressures greater than normal atmospheric pressure. The sample can be heated and its surface imaged in aqueous solution at temperatures greater than 100.degree. C. with less than 1 nm vertical resolution. A gas pressurized microscope base chamber houses the stepper motor and piezoelectric scanner. A chemically inert, flexible membrane separates this base chamber from the sample cell environment and constrains a high temperature, pressurized liquid or gas in the sample cell while allowing movement of the scanner. The sample cell is designed for continuous flow of liquid or gas through the sample environment.

  11. Dark Forces At The Tevatron

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Buckley, Matt; Fileviez Perez, Pavel; Hooper, Dan; Neil, Ethan

    2011-08-19

    A simple explanation of the W + dijet excess recently reported by the CDF collaboration involves the introduction of a new gauge boson with sizable couplings to quarks, but with no or highly suppressed couplings to leptons. Anomaly-free theories which include such a leptophobic gauge boson must also include additional particle content, which may include a stable and otherwise viable candidate for dark matter. Based on the couplings and mass of the Z` required to generate the CDF excess, we predict such a dark matter candidate to possess an elastic scattering cross section with nucleons on the order of σmore » ~ 10-40 cm2, providing a natural explanation for the signals reported by the CoGeNT and DAMA/LIBRA collaborations. In this light, CDF may be observing the gauge boson responsible for the force which mediates the interactions between the dark and visible matter of our universe.« less

  12. June 11, 2009, HSS/Union Task Meeting on 2009 HSS/Union Task Progress - Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06-05-09 HSS/Union Working Group Meeting June 11, 2009 1:00 - 2:30 pm EST FORS 7E-069 Call-in: 301-903-0688 SUBJECT: 2009 HSS/Union Task Progress Union Working Group Participants: 2008 Topical Union Leads Ron Ault/Tom Schaffer..................AFL-CIO Metal Trades Department Pete Stafford...................................... Building and Construction Trades Department Center for Construction Research & Training (BCTD CPWR) Chico McGill/Dennis Phelps............International Brotherhood of

  13. June 11, 2009, HSS/Union Task Meeting on 2009 HSS/Union Task Progress - Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    23-09 HSS/Union Working Group Meeting 2009 HSS/Union Task Progress and Next Steps June 11, 2009 In introductory remarks, Glenn Podonsky, Chief Health, Safety and Security Officer, underscored HSS's commitment to engage in this collective effort with the Unions and stakeholders to improve worker health, safety and security across the DOE Complex. He provided an overview of the past several years of the HSS Focus Group effort in which the worker, through Union representatives and stakeholders,

  14. Pacific Lamprey Research and Restoration : Annual Report 1997.

    SciTech Connect (OSTI)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  15. EIS-0425: Mid-Columbia Coho Restoration, Washington

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of DOE’s Bonneville Power Administration’s proposal to fund the construction, operation, and maintenance of a coho salmon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action would involve building a new, small, in-basin adult holding/spawning, incubation and rearing facility on the Wenatchee River at one of two potential sites; and constructing and improving several sites in both the Wenatchee and Methow river basins in north central Washington State.

  16. EA-2027: Steigerwald Floodplain Restoration Project; Clark County, Washington

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) is preparing an EA that analyzes the potential environmental impacts of a proposal to restore floodplain connectivity to the Columbia River within the Steigerwald Lake National Wildlife Refuge. The proposed project would involve reconnecting Gibbons Creek to the Columbia River by breaching a U.S. Army Corps of Engineers' levee; removing a diversion structure, fish ladder, elevated channel, and water control structure; replacing a state highway bridge; constructing a setback levee; enhancing approximately two miles of wetland channels; and re-establishing the site's riparian forest. BPA’s proposed action is to fund the proposal.

  17. In-Medium Vector Mesons, Dileptons and Chiral Restoration

    SciTech Connect (OSTI)

    Rapp, Ralf

    2010-12-28

    Medium modifications of the electromagnetic spectral function in hadronic and quark-gluon matter are reviewed. A strong broadening of the {rho} meson, which dominates the spectral function in the low-mass regime, is quantitatively consistent with dilepton excess spectra measured in photoproduction off cold nuclei (CLAS/JLab) and in fixed-target ultrarelativistic heavy-ion collisions (NA45,NA60/CERN-SPS). The large excess observed by PHENIX at RHIC remains unexplained to date, but is most likely not due to emission from the Quark-Gluon Plasma. Connections to thermal lattice QCD promise progress in the search for chiral symmetry restoration.

  18. Environmental Restoration Disposal Facility (Project W-296) Safety Assessment

    SciTech Connect (OSTI)

    Armstrong, D.L.

    1994-08-01

    This Safety Assessment is based on information derived from the Conceptual Design Report for the Environmental Restoration Disposal Facility (DOE/RL 1994) and ancillary documentation developed during the conceptual design phase of Project W-296. The Safety Assessment has been prepared to support the Solid Waste Burial Ground Interim Safety Basis document. The purpose of the Safety Assessment is to provide an evaluation of the design to determine if the process, as proposed, will comply with US Department of Energy (DOE) Limits for radioactive and hazardous material exposures and be acceptable from an overall health and safety standpoint. The evaluation considered affects on the worker, onsite personnel, the public, and the environment.

  19. Blackout 2003: U.S.- Canada Task Force Presents Final Report onBlackout of August 2003

    Broader source: Energy.gov [DOE]

    August 14, 2003, saw the worst blackout in North American history. Today, Spencer Abraham, U.S. Secretary of Energy, and the Honorable R. John Efford, Minister of Natural Resources Canada, released...

  20. Engineering task plan for five portable exhausters

    SciTech Connect (OSTI)

    Rensink, G.E.

    1997-10-01

    Exhausters will be employed to ventilate certain single-shell tanks (SSTs) during salt well pumping campaigns. Active ventilation is necessary to reduce the potential flammable gas inventory (LANL 1996a) in the dome space that may accumulate during steady-state conditions or during/after postulated episodic gas release events. The tanks described in this plan support the activities required to fabricate and test three 500 cfm portable exhausters in the 200 W area shops, and to procure, design, fabricate and test two 1000 cfm units. Appropriate Notice of Construction (NOC) radiological and toxic air pollutant permits will be obtained for the portable exhausters. The portable exhauster design media to be employed to support this task was previously developed for the 241-A-101 exhauster. The same design as A101 will be fabricated with only minor improvements to the design based upon operator input/lessons learned. The safety authorization basis for this program effort will follow SAD 36 (LANL 1996b), and each tank will be reviewed against this SAD for changes or updates. The 1000 cfm units will be designed by the selected offsite contractor according to the specification requirements in KHC-S-O490. The offsite units have been specified to utilize as many of the same components as the 500 cfm units to ensure a more cost effective operation and maintenance through the reduction of spare parts and additional procedures.

  1. Hanford Waste Treatment Plant Support Task Order Modified | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Waste Treatment Plant Support Task Order Modified Hanford Waste Treatment Plant Support Task Order Modified March 11, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a modification to a task order to Aspen Resources Limited, Inc. of Boulder, Colorado for support of the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site. The modification increased the value of the

  2. Energy Department Awards First Major Task Order Under Streamlined

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracting System | Department of Energy First Major Task Order Under Streamlined Contracting System Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up WASHINGTON, DC - The Department of Energy (DOE) has awarded a Task Order for an estimated $19.4 million to LATA-SHARP Remediation Services, LLC for the completion of clean-up activities at the Ashtabula Closure Project (ACP)

  3. Task 8 - management and reporting. Semi-annual report April 1--September 30, 1996

    SciTech Connect (OSTI)

    1997-05-01

    The task of restoring nuclear defense complex sites under the U.S. Department of Energy (DOE) Environmental Management (EM) program presents an unprecedented challenge to the environmental restoration community. Effective and efficient cleanup requires the timely development or modification of novel cleanup technologies applicable to radioactive wastes. Fostering the commercialization of these innovative technologies is the mission of EM-50, the EM Program Office of Science and Technology. DOE`s Morgantown Energy Technology Center (METC) pursues activities integral to the EM-50 mission through its Cooperative Agreement with the EM Office of Science and Technology. The advancement of innovative technologies is often arrested at the {open_quotes}valley of death,{close_quotes} the general term for barriers to demonstration and commercialization. Alternatively, commercialization and deployment are impacted by a lack of clear choices among competing technologies. The Energy & Environmental Research Center (EERC), a not-for-profit, contract-supported organization focused on research, development, demonstration, and commercialization (RDD&C) of energy and environmental technologies, is in the second year of a Cooperative Agreement with METC designed (1) to deliver EM technologies into the commercial marketplace through a unique combination of technical support, real-world demonstrations, and brokering; (2) to facilitate decisions regarding deployment and support for commercialization by providing comparative performance data through systems analysis; and (3) to support the integration and deployment of {open_quotes}winner{close_quotes} technologies at EM sites. These activities, along with program management, make up the four program areas of the METC-EERC EM Cooperative Agreement (EMCA): Technology Commercialization, Systems Engineering, Technology Integration, and Management and Reporting.

  4. Task Order Price Evaluation Worksheet for SUPER ESPC

    Broader source: Energy.gov [DOE]

    Document provides a worksheet for evaluating price for a task order as part of a Super Energy Savings Performance Contract (ESPC).

  5. DOE Awards Research and Systems Engineering Task Order | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Research and Systems Engineering Task Order DOE Awards Research and Systems Engineering Task Order April 28, 2016 - 2:00pm Addthis Media Contact: Lynette Chafin (513) 246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a task order to the MITRE Corporation, of McLean Virginia. MITRE will provide research and development in support of DOE's Office of Environmental Management. The task order has an approximate value of $1.176 million,

  6. Design issues in the semantics and scheduling of asynchronous tasks.

    SciTech Connect (OSTI)

    Olivier, Stephen L.

    2013-07-01

    The asynchronous task model serves as a useful vehicle for shared memory parallel programming, particularly on multicore and manycore processors. As adoption of model among programmers has increased, support has emerged for the integration of task parallel language constructs into mainstream programming languages, e.g., C and C++. This paper examines some of the design decisions in Cilk and OpenMP concerning semantics and scheduling of asynchronous tasks with the aim of informing the efforts of committees considering language integration, as well as developers of new task parallel languages and libraries.

  7. Energy Department Awards First Major Task Order Under Streamlined...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up ...

  8. Authorize_Changes_Contractor_Work_Force_Restructuring_Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AuthorizeChangesContractorWorkForceRestructuringPolicy.pdf AuthorizeChangesContractorWorkForceRestructuringPolicy.pdf PDF icon AuthorizeChangesContractorWorkForceR...

  9. Gasification Studies Task 4 Topical Report

    SciTech Connect (OSTI)

    Whitty, Kevin; Fletcher, Thomas; Pugmire, Ronald; Smith, Philip; Sutherland, James; Thornock, Jeremy; Boshayeshi, Babak; Hunsacker, Isaac; Lewis, Aaron; Waind, Travis; Kelly, Kerry

    2014-02-01

    A key objective of the Task 4 activities has been to develop simulation tools to support development, troubleshooting and optimization of pressurized entrained-flow coal gasifiers. The overall gasifier models (Subtask 4.1) combine submodels for fluid flow (Subtask 4.2) and heat transfer (Subtask 4.3) with fundamental understanding of the chemical processes (Subtask 4.4) processes that take place as coal particles are converted to synthesis gas and slag. However, it is important to be able to compare predictions from the models against data obtained from actual operating coal gasifiers, and Subtask 4.6 aims to provide an accessible, non-proprietary system, which can be operated over a wide range of conditions to provide well-characterized data for model validation. Highlights of this work include: • Verification and validation activities performed with the Arches coal gasification simulation tool on experimental data from the CANMET gasifier (Subtask 4.1). • The simulation of multiphase reacting flows with coal particles including detailed gas-phase chemistry calculations using an extension of the one-dimensional turbulence model’s capability (Subtask 4.2). • The demonstration and implementation of the Reverse Monte Carlo ray tracing (RMCRT) radiation algorithm in the ARCHES code (Subtask 4.3). • Determination of steam and CO{sub 2} gasification kinetics of bituminous coal chars at high temperature and elevated pressure under entrained-flow conditions (Subtask 4.4). In addition, attempts were made to gain insight into the chemical structure differences between young and mature coal soot, but both NMR and TEM characterization efforts were hampered by the highly reacted nature of the soot. • The development, operation, and demonstration of in-situ gas phase measurements from the University of Utah’s pilot-scale entrained-flow coal gasifier (EFG) (Subtask 4.6). This subtask aimed at acquiring predictable, consistent performance and characterizing the

  10. Casimir force between integrable and chaotic pistons

    SciTech Connect (OSTI)

    Alvarez, Ezequiel; Mazzitelli, Francisco D.; Wisniacki, Diego A. [Departamento de Fisica, Facultad de Ciencias Exactas y Naturales Universidad de Buenos Aires, and Instituto de Fisica de Buenos Aires, Concejo Nacional de Investigaciones Cientificas y Tecnicas, Ciudad Universitaria, Pabellon I, 1428 Buenos Aires (Argentina); Monastra, Alejandro G. [Gerencia de Investigacion y Aplicaciones, Comision Nacional de Energia Atomica, Concejo Nacional de Investigaciones Cientificas y Tecnicas, Avenida General Paz 1499, 1650 San Martin (Argentina)

    2010-11-15

    We have computed numerically the Casimir force between two identical pistons inside a very long cylinder, considering different shapes for the pistons. The pistons can be considered quantum billiards, whose spectrum determines the vacuum force. The smooth part of the spectrum fixes the force at short distances and depends only on geometric quantities like the area or perimeter of the piston. However, correcting terms to the force, coming from the oscillating part of the spectrum which is related to the classical dynamics of the billiard, could be qualitatively different for classically integrable or chaotic systems. We have performed a detailed numerical analysis of the corresponding Casimir force for pistons with regular and chaotic classical dynamics. For a family of stadium billiards, we have found that the correcting part of the Casimir force presents a sudden change in the transition from regular to chaotic geometries. This suggests that there could be signatures of quantum chaos in the Casimir effect.

  11. Site descriptions of environmental restoration units at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Kuhaida, A.J. Jr.; Parker, A.F.

    1997-02-01

    This report provides summary information on Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) sites as listed in the Oak Ridge Reservation Federal Facility Agreement (FFA), dated January 1, 1992, Appendix C. The Oak Ridge National Laboratory was built in 1943 as part of the World War II Manhattan Project. The original mission of ORNL was to produce and chemically separate the first gram-quantities of plutonium as part of the national effort to produce the atomic bomb. The current mission of ORNL is to provide applied research and development in support of the U.S. Department of Energy (DOE) programs in nuclear fusion and fission, energy conservation, fossil fuels, and other energy technologies and to perform basic scientific research in selected areas of the physical, life, and environmental sciences. ER is also tasked with clean up or mitigation of environmental impacts resulting from past waste management practices on portions of the approximately 37,000 acres within the Oak Ridge Reservation (ORR). Other installations located within the ORR are the Gaseous Diffusion Plant (K-25) and the Y-12 plant. The remedial action strategy currently integrates state and federal regulations for efficient compliance and approaches for both investigations and remediation efforts on a Waste Area Grouping (WAG) basis. As defined in the ORR FFA Quarterly Report July - September 1995, a WAG is a grouping of potentially contaminated sites based on drainage area and similar waste characteristics. These contaminated sites are further divided into four categories based on existing information concerning whether the data are generated for scoping or remedial investigation (RI) purposes. These areas are as follows: (1) Operable Units (OU); (2) Characterization Areas (CA); (3) Remedial Site Evaluation (RSE) Areas; and (4) Removal Site Evaluation (RmSE) Areas.

  12. Reengineering of Analytical Data Management for the Environmental Restoration Project at Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Bolivar, S.; Dorries, A.; Nasser, K.; Scherma, S.

    2003-02-27

    The Environmental Restoration (ER) Project at Los Alamos National Laboratory (LANL) is responsible for the characterization, clean up, and monitoring of over 2,124 identified potential release sites (PRS). These PRSs have resulted from operations associated with weapons and energy related research which has been conducted at LANL since 1942. To accomplish mission goals, the ER Project conducts field sampling to determine possible types and levels of chemical contamination as well as their geographic extent. Last fiscal year, approximately 4000 samples were collected during ER Project field sampling campaigns. In the past, activities associated with field sampling such as sample campaign planning, paperwork, shipping and analytical laboratory tracking; verification and order fulfillment; validation and data quality assurance were performed by multiple groups working with a variety of software applications, databases and hard copy reports. This resulted in significant management and communication difficulties, data delivery delays, and inconsistent processes; it also represented a potential threat to overall data integrity. Creation of an organization, software applications and a data process that could provide for cost-effective management of the activities and data mentioned above became a management priority, resulting in a development of a reengineering task. This reengineering effort--currently nearing completion--has resulted in personnel reorganization, the development of a centralized data repository, and a powerful web-based sample management system that allows for an appreciably streamlined and more efficient data process. These changes have collectively cut data delivery times, allowed for larger volumes of samples and data to be handled with fewer personnel, and resulted in significant cost savings. This paper will provide a case study of the reengineering effort undertaken by the ER Project of its analytical data management process. It includes

  13. DOE Transfers $5 million to NREL, Jobs to be Restored | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Transfers $5 million to NREL, Jobs to be Restored DOE Transfers $5 million to NREL, Jobs to be Restored February 20, 2006 - 12:06pm Addthis WASHINGTON, DC - At the direction of Energy Secretary Samuel W. Bodman, $5 million was transferred to Midwest Research Institute, the operating contractor for the Department of Energy's (DOE) National Renewable Energy Laboratory (NREL), over the weekend. DOE has been informed that the NREL lab director will use these funds to immediately restore

  14. 2011-08 "Restore User Confidence in the Risk Analysis, Communication,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation, and Reduction (RACER) Database" | Department of Energy 8 "Restore User Confidence in the Risk Analysis, Communication, Evaluation, and Reduction (RACER) Database" 2011-08 "Restore User Confidence in the Risk Analysis, Communication, Evaluation, and Reduction (RACER) Database" This recommendation will ensure restoration of public confidence in a database that has been presented as a reliable tool for the public to understand the status of samples from the

  15. Protective Forces | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Protective Forces NNSA has some of the best trained and best equipped forces protecting its nuclear weapons and material. Since the events of September 11, 2001, NNSA has hired additional armed security police officers. It has also shifted towards a paramilitary, "tactical response force" that utilizes a robust mix of offensive and defensive qualified officers who are well-trained in small team and weapons tactics. It has improved its training capabilities by expanding training ranges

  16. ARM - PI Product - Direct Aerosol Forcing Uncertainty

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ProductsDirect Aerosol Forcing Uncertainty ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Direct Aerosol Forcing Uncertainty Understanding sources of uncertainty in aerosol direct radiative forcing (DRF), the difference in a given radiative flux component with and without aerosol, is essential to quantifying changes in Earth's radiation budget. We examine the uncertainty in DRF due to measurement

  17. NONLINEAR FORCE PROFILE USED TO INCREASE THE PERFORMANCE OF A HAPTIC USER INTERFACE FOR TELEOPERATING A ROBOTIC HAND

    SciTech Connect (OSTI)

    Anthony L. Crawford

    2012-07-01

    MODIFIED PAPER TITLE AND ABSTRACT DUE TO SLIGHTLY MODIFIED SCOPE: TITLE: Nonlinear Force Profile Used to Increase the Performance of a Haptic User Interface for Teleoperating a Robotic Hand Natural movements and force feedback are important elements in using teleoperated equipment if complex and speedy manipulation tasks are to be accomplished in hazardous environments, such as hot cells, glove boxes, decommissioning, explosives disarmament, and space. The research associated with this paper hypothesizes that a user interface and complementary radiation compatible robotic hand that integrates the human hand’s anthropometric properties, speed capability, nonlinear strength profile, reduction of active degrees of freedom during the transition from manipulation to grasping, and just noticeable difference force sensation characteristics will enhance a user’s teleoperation performance. The main contribution of this research is in that a system that concisely integrates all these factors has yet to be developed and furthermore has yet to be applied to a hazardous environment as those referenced above. In fact, the most prominent slave manipulator teleoperation technology in use today is based on a design patented in 1945 (Patent 2632574) [1]. The robotic hand/user interface systems of similar function as the one being developed in this research limit their design input requirements in the best case to only complementing the hand’s anthropometric properties, speed capability, and linearly scaled force application relationship (e.g. robotic force is a constant, 4 times that of the user). In this paper a nonlinear relationship between the force experienced between the user interface and the robotic hand was devised based on property differences of manipulation and grasping activities as they pertain to the human hand. The results show that such a relationship when subjected to a manipulation task and grasping task produces increased performance compared to the

  18. Piezoresponse Force Microscopy: A Window into Electromechanical...

    Office of Scientific and Technical Information (OSTI)

    Behavior at the Nanoscale Citation Details In-Document Search Title: Piezoresponse Force Microscopy: A Window into Electromechanical Behavior at the Nanoscale Authors: Bonnell, ...

  19. Sandia Energy - Air Force Research Laboratory Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from the Air Force Research Laboratory in Albuquerque utilized the site at the National Solar Thermal Test Facility to evaluate seismic and optical activity from explosives set...

  20. Sandia Energy - Air Force Research Laboratory Testing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Air Force Research Laboratory (AFRL) in Albuquerque utilized the site at the National Solar Thermal Test Facility (NSTTF) to evaluate seismic and optical activity from...

  1. NREL: Measurements and Characterization - Atomic Force Microscopy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Atomic Force Microscopy Atomic Force Microscopy (AFM) operates in several modes. In contact mode, a tip that is attached to a cantilever is scanned over the sample surface, while the force between tip and sample is measured. While the tip is scanned laterally, the force is kept constant by moving the cantilever/tip assembly up and down, so that the deflection of the cantilever is kept constant. The vertical movement of the cantilever/tip assembly is recorded and used to generate an image of the

  2. Elastic actuator for precise force control

    DOE Patents [OSTI]

    Pratt, G.A.; Williamson, M.M.

    1997-07-22

    The invention provides an elastic actuator consisting of a motor and a motor drive transmission connected at an output of the motor. An elastic element is connected in series with the motor drive transmission, and this elastic element is positioned to alone support the full weight of any load connected at an output of the actuator. A single force transducer is positioned at a point between a mount for the motor and an output of the actuator. This force transducer generates a force signal, based on deflection of the elastic element, that indicates force applied by the elastic element to an output of the actuator. An active feedback force control loop is connected between the force transducer and the motor for controlling the motor. This motor control is based on the force signal to deflect the elastic element an amount that produces a desired actuator output force. The produced output force is substantially independent of load motion. The invention also provides a torsional spring consisting of a flexible structure having at least three flat sections each connected integrally with and extending radially from a central section. Each flat section extends axially along the central section from a distal end of the central section to a proximal end of the central section. 30 figs.

  3. Elastic actuator for precise force control

    DOE Patents [OSTI]

    Pratt, Gill A.; Williamson, Matthew M.

    1997-07-22

    The invention provides an elastic actuator consisting of a motor and a motor drive transmission connected at an output of the motor. An elastic element is connected in series with the motor drive transmission, and this elastic element is positioned to alone support the full weight of any load connected at an output of the actuator. A single force transducer is positioned at a point between a mount for the motor and an output of the actuator. This force transducer generates a force signal, based on deflection of the elastic element, that indicates force applied by the elastic element to an output of the actuator. An active feedback force control loop is connected between the force transducer and the motor for controlling the motor. This motor control is based on the force signal to deflect the elastic element an amount that produces a desired actuator output force. The produced output force is substantially independent of load motion. The invention also provides a torsional spring consisting of a flexible structure having at least three flat sections each connected integrally with and extending radially from a central section. Each flat section extends axially along the central section from a distal end of the central section to a proximal end of the central section.

  4. Clark Fork River Delta Restoration Project 1 Finding of No Significant...

    Broader source: Energy.gov (indexed) [DOE]

    findings for its proposal to provide partial funding to the Idaho Department of Fish and Game's (IDFG) Clark Fork River Delta Restoration Project. The project would involve...

  5. 2011-08 "Restore User Confidence in the Risk Analysis, Communication...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Reduction (RACER) Database" 2011-08 "Restore User Confidence in the Risk Analysis, Communication, Evaluation, and Reduction (RACER) Database" This recommendation will ...

  6. Project Design Concept for Transfer Piping For Project W-314 Tank Farm Restoration and Safe Operations

    SciTech Connect (OSTI)

    MCGREW, D.L.

    1999-09-28

    This Project Design Concept represents operational requirements for design of transfer piping system for Phase I of Project W-314, Tank Farm Restoration and Safe Operation Upgrades.

  7. Task 8 -- Design and test of critical components

    SciTech Connect (OSTI)

    Chance, T.F.

    1996-11-01

    This report covers tasks 8.1, 8.1.1, and 8.2. The primary objective of Task 8.1, Particulates Flow Deposition, is to characterize the particulate generated in an operating gas turbine combined cycle (GTCC) power plant whose configuration approximates that proposed for an ATS power plant. In addition, the task is to evaluate the use of full-flow filtering to reduce the steam particulate loads. Before the start of this task, GE had already negotiated an agreement with the candidate power plant, piping and a filter unit had already been installed at the power plant site, and major elements of the data acquisition system had been purchased. The objective of Task 8.1.1, Coolant Purity, is to expose typical ATS gas turbine airfoil cooling channel geometries to real steam flow to determine whether there are any unexpected deposit formations. The task is a static analog of the centrifugal deposition rig trials of Task 8.2, in which a bucket channel return bend is exposed to steam flow. Two cooling channel geometries are of primary interest in this static exposure. The primary objective of Task 8.2, Particle Centrifugal Sedimentation, is to determine the settling characteristics of particles in a cooling stream from an operating gas turbine combined cycle (GTCC) power plant when that stream is ducted through a passage experiencing the G-loads expected in a simulated bucket channel specimen representative of designs proposed for an ATS gas turbine.

  8. DOE Awards Task Order for Lexington Project Office Audit

    Broader source: Energy.gov [DOE]

    Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

  9. Characterizing and Mitigating Work Time Inflation in Task Parallel Programs

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Olivier, Stephen L.; de Supinski, Bronis R.; Schulz, Martin; Prins, Jan F.

    2013-01-01

    Task parallelism raises the level of abstraction in shared memory parallel programming to simplify the development of complex applications. However, task parallel applications can exhibit poor performance due to thread idleness, scheduling overheads, and work time inflation – additional time spent by threads in a multithreaded computation beyond the time required to perform the same work in a sequential computation. We identify the contributions of each factor to lost efficiency in various task parallel OpenMP applications and diagnose the causes of work time inflation in those applications. Increased data access latency can cause significant work time inflation in NUMAmore » systems. Our locality framework for task parallel OpenMP programs mitigates this cause of work time inflation. Our extensions to the Qthreads library demonstrate that locality-aware scheduling can improve performance up to 3X compared to the Intel OpenMP task scheduler.« less

  10. Ecological risks of DOE`s programmatic environmental restoration alternatives

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

  11. Restoration of abandoned mine lands through cooperative coal resource evaluations

    SciTech Connect (OSTI)

    Hoskins, D.M.; Smith, M.

    1996-12-31

    The public reclamation cost of reclaiming all of Pennsylvania`s abandoned mine lands is estimated at $15 billion. Drainage from abandoned mines poses another $5 billion water pollution clean-up problem. Although it is unlikely that public reclamation alone could ever tackle these problems, much can be done to alleviate the nuisances through the remining of previously mined areas to recover remaining reserves, restore the land and improve water quality in the same process. Remining of priority areas is encouraged through a new Pennsylvania policy which provides incentives to mining companies. One incentive, initiated under Pennsylvania`s comprehensive mine reclamation strategy, is to identify and geologically map reminable coal resources in selected watersheds, and then to expedite mine permitting in these watersheds. At present, two such priority watersheds, Little Toby Creek in Elk County and Tangascootak Creek in Clinton County, are the focus of geologic map compilation based on recent quadrangle mapping, or new, directed, geologic mapping, including new research core drilling to establish the geologic stratigraphic framework. In order to maximize environmental benefits the comprehensive mine reclamation strategy identifies watersheds which are affected by acid mine drainage (AMD), but that are reasonably capable of restoration, if sufficient coal reserves remain. Pennsylvania`s geochemical quality database of rock overburden, in combination with detailed coal resource mapping by the Pennsylvania Geological Survey, and the cooperation of coal companies and leaseholders, is being used by the Department of Environmental Protection (DEP) to identify and design remining projects which will not only allow the recovery of coal resources, but will also improve the water quality through a variety of innovative mining techniques.

  12. MEAM interatomic force calculation subroutine for LAMMPS

    Energy Science and Technology Software Center (OSTI)

    2010-10-25

    Interatomic force and energy calculation subroutine tobe used with the molecular dynamics simulation code LAMMPS (Ref a.). The code evaluates the total energy and atomic forces (energy gradient) according to cubic spine-based variant (Ref b.) of the Modified Embedded Atom Method (MEAM).

  13. An improved proximity force approximation for electrostatics

    SciTech Connect (OSTI)

    Fosco, Cesar D.; Instituto Balseiro, Universidad Nacional de Cuyo, R8402AGP Bariloche ; Lombardo, Fernando C.; IFIBA ; Mazzitelli, Francisco D.

    2012-08-15

    A quite straightforward approximation for the electrostatic interaction between two perfectly conducting surfaces suggests itself when the distance between them is much smaller than the characteristic lengths associated with their shapes. Indeed, in the so called 'proximity force approximation' the electrostatic force is evaluated by first dividing each surface into a set of small flat patches, and then adding up the forces due two opposite pairs, the contributions of which are approximated as due to pairs of parallel planes. This approximation has been widely and successfully applied in different contexts, ranging from nuclear physics to Casimir effect calculations. We present here an improvement on this approximation, based on a derivative expansion for the electrostatic energy contained between the surfaces. The results obtained could be useful for discussing the geometric dependence of the electrostatic force, and also as a convenient benchmark for numerical analyses of the tip-sample electrostatic interaction in atomic force microscopes. - Highlights: Black-Right-Pointing-Pointer The proximity force approximation (PFA) has been widely used in different areas. Black-Right-Pointing-Pointer The PFA can be improved using a derivative expansion in the shape of the surfaces. Black-Right-Pointing-Pointer We use the improved PFA to compute electrostatic forces between conductors. Black-Right-Pointing-Pointer The results can be used as an analytic benchmark for numerical calculations in AFM. Black-Right-Pointing-Pointer Insight is provided for people who use the PFA to compute nuclear and Casimir forces.

  14. armed forces | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    armed forces CNS employees greet Honor Air veterans Y-12 Deputy Site Manager Gene Sievers, left, and ProForce's Neal Wolfenbarger pose for photo at McGhee Tyson Airport in Knoxville, TN, as Wolfenbarger waits on his uncle to return from Washington, D.C. Veterans Day is important to all Americans, but it carries an even more elevated meaning to those

  15. Macroscopic model of scanning force microscope

    DOE Patents [OSTI]

    Guerra-Vela, Claudio; Zypman, Fredy R.

    2004-10-05

    A macroscopic version of the Scanning Force Microscope is described. It consists of a cantilever under the influence of external forces, which mimic the tip-sample interactions. The use of this piece of equipment is threefold. First, it serves as direct way to understand the parts and functions of the Scanning Force Microscope, and thus it is effectively used as an instructional tool. Second, due to its large size, it allows for simple measurements of applied forces and parameters that define the state of motion of the system. This information, in turn, serves to compare the interaction forces with the reconstructed ones, which cannot be done directly with the standard microscopic set up. Third, it provides a kinematics method to non-destructively measure elastic constants of materials, such as Young's and shear modules, with special application for brittle materials.

  16. Measurement of tool forces in diamond turning

    SciTech Connect (OSTI)

    Drescher, J.; Dow, T.A.

    1988-12-01

    A dynamometer has been designed and built to measure forces in diamond turning. The design includes a 3-component, piezoelectric transducer. Initial experiments with this dynamometer system included verification of its predicted dynamic characteristics as well as a detailed study of cutting parameters. Many cutting experiments have been conducted on OFHC Copper and 6061-T6 Aluminum. Tests have involved investigation of velocity effects, and the effects of depth and feedrate on tool forces. Velocity has been determined to have negligible effects between 4 and 21 m/s. Forces generally increase with increasing depth of cut. Increasing feedrate does not necessarily lead to higher forces. Results suggest that a simple model may not be sufficient to describe the forces produced in the diamond turning process.

  17. Restoring Resiliency: Case Studies from Pacific Northwest Estuarine Eelgrass (Zostera marina L.) Ecosystems

    SciTech Connect (OSTI)

    Thom, Ronald M.; Diefenderfer, Heida L.; Vavrinec, John; Borde, Amy B.

    2012-01-01

    The purpose of many ecological restoration projects is to establish an ecosystem with fully developed structure and function that exhibits resistance to and resilience from disturbances. Coastal restoration projects in the Pacific Northwest provide opportunities to understand what is required to restore the resilience of eelgrass (Zostera marina L.) populations. Factors influencing resilience observed in three case studies of eelgrass restoration include minimum viable population, adaptations of transplant populations, and natural and anthropogenic disturbances at restoration sites. The evaluation of resiliency depends on selecting appropriate monitoring metrics and the frequency and duration of monitoring. Eelgrass area, cover and shoot density provide useful and reliable metrics for quantifying resilience of restored meadows. Further, five years of monitoring of these metrics provides data that can reasonably predict the long-term viability of a planted plot. Eelgrass appears to be a resilient ecosystem in general, though one that data suggest may exhibit tipping points brought about by compounded environmental conditions outside of its tolerance ranges. Explicit inclusion of resilience in the planning and practice of habitat restoration may reduce uncertainties and improve the performance of restored systems by increasing buffering capacity, nurturing sources of renewal (e.g., seeds and rhizomes), and managing for habitat forming and maintaining processes (e.g., sediment dynamics) at multiple scales.

  18. A Review of Power Outages and Restoration Following the June 2012 Derecho

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability has released a report that reviews power outages and restoration efforts following the June 29, 2012 Derecho and compares them to outages and restoration efforts following other spring and summer storms in the Ohio Valley and Mid-Atlantic regions.

  19. Environmental Restoration Site-Specific Plan for the Portsmouth Gaseous Diffusion Plant, FY 93

    SciTech Connect (OSTI)

    Not Available

    1993-01-15

    The purpose of this Site-Specific Plan (SSP) is to describe past, present, and future activities undertaken to implement Environmental Restoration and Waste Management goals at the Portsmouth Gaseous Diffusion Plant (PORTS). The SSP is presented in sections emphasizing Environmental Restoration description of activities, resources, and milestones.

  20. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10:00am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Firm-Fixed Unit Rate Task Order to Sage Energy Trading of Jenks, OK. Sage Energy Trading is a Woman Owned Small Business. The Task Order will have a maximum value of $3.5 million over 2 years. Work performed under this Task Order will be performed at the Portsmouth Gaseous Diffusion Plant in Piketon, OH. The contractor will be

  1. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Time and Materials Task Order to Industrial Economics, Incorporated, located in Cambridge, MA. Industrial Economics, Incorporated is a Small Business. The Task Order will have a maximum value of $1.77 million over 3 years. Work performed under this Task Order will be performed at the Los Alamos National Laboratory in Los Alamos, NM.

  2. Thermoacoustic engine simulations with lattice Boltzmann CFD. Tasks 3, 4 and 5 progress report

    SciTech Connect (OSTI)

    1995-02-06

    Advanced Projects Research Incorporated has completed tasks number 3, 4 and 5 of the specified tasks in the LANL subcontract. Task 3 required measurement of the acoustic attenuation for various thermoacoustic conditions and Task 4 involved the analysis of the energy transfer mechanisms for the geometries of Task 3. Finally, Task 5 specified that simulations of thermoacoustic engine configurations used at LANL were to be performed. Discussion of all 3 task results is presented.

  3. Command and Control Architectures for Autonomous Micro-Robotic Forces - FY-2000 Project Report

    SciTech Connect (OSTI)

    Dudenhoeffer, Donald Dean

    2001-04-01

    Advances in Artificial Intelligence (AI) and micro-technologies will soon give rise to production of large-scale forces of autonomous micro-robots with systems of innate behaviors and with capabilities of self-organization and real world tasking. Such organizations have been compared to schools of fish, flocks of birds, herds of animals, swarms of insects, and military squadrons. While these systems are envisioned as maintaining a high degree of autonomy, it is important to understand the relationship of man with such machines. In moving from research studies to the practical deployment of large-scale numbers of robots, one of critical pieces that must be explored is the command and control architecture for humans to re-task and also inject global knowledge, experience, and intuition into the force. Tele-operation should not be the goal, but rather a level of adjustable autonomy and high-level control. If a herd of sheep is comparable to the collective of robots, then the human element is comparable to the shepherd pulling in strays and guiding the herd in the direction of greener pastures. This report addresses the issues and development of command and control for largescale numbers of autonomous robots deployed as a collective force.

  4. Building Restoration Operations Optimization Model Beta Version 1.0

    Energy Science and Technology Software Center (OSTI)

    2007-05-31

    The Building Restoration Operations Optimization Model (BROOM), developed by Sandia National Laboratories, is a software product designed to aid in the restoration of large facilities contaminated by a biological material. BROOM’s integrated data collection, data management, and visualization software improves the efficiency of cleanup operations, minimizes facility downtime, and provides a transparent basis for reopening the facility. Secure remote access to building floor plans Floor plan drawings and knowledge of the HVAC system are criticalmore » to the design and implementation of effective sampling plans. In large facilities, access to these data may be complicated by the sheer abundance and disorganized state they are often stored in. BROOM avoids potentially costly delays by providing a means of organizing and storing mechanical and floor plan drawings in a secure remote database that is easily accessed. Sampling design tools BROOM provides an array of tools to answer the question of where to sample and how many samples to take. In addition to simple judgmental and random sampling plans, the software includes two sophisticated methods of adaptively developing a sampling strategy. Both tools strive to choose sampling locations that best satisfy a specified objective (i.e. minimizing kriging variance) but use numerically different strategies to do so. Surface samples are collected early in the restoration process to characterize the extent of contamination and then again later to verify that the facility is safe to reenter. BROOM supports sample collection using a ruggedized PDA equipped with a barcode scanner and laser range finder. The PDA displays building floor drawings, sampling plans, and electronic forms for data entry. Barcodes are placed on sample containers for the purpose of tracking the specimen and linking acquisition data (i.e. location, surface type, texture) to laboratory results. Sample location is determined by activating the integrated

  5. Sensing Current and Forces with SPM

    SciTech Connect (OSTI)

    Park, Jeong Y.; Maier, Sabine; Hendriksen, Bas; Salmeron, Miquel

    2010-07-02

    Atomic force microscopy (AFM) and scanning tunneling microscopy (STM) are well established techniques to image surfaces and to probe material properties at the atomic and molecular scale. In this review, we show hybrid combinations of AFM and STM that bring together the best of two worlds: the simultaneous detection of atomic scale forces and conduction properties. We illustrate with several examples how the detection of forces during STM and the detection of currents during AFM can give valuable additional information of the nanoscale material properties.

  6. air force | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    air force NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range WASHINGTON - The National Nuclear Security Administration (NNSA) and United States Air Force completed the third development flight test of a non-nuclear B61-12 nuclear gravity bomb at Tonopah Test Range in Nevada on October 20, 2015. "This demonstration of effective end-to-end system... The man who trains everyone on the bombs Mark Meyer, training coordinator and field

  7. Microsoft Word - Segment and Value Propositions Draft Task 6...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The data in-take interface needs to be smart and task ... this capital-investment-heavy industry minimize costs. ... and IT assets such as servers, cables, and power grids. ...

  8. Task Order Awarded for Audit and Review Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services.

  9. DOE Awards Task Order Modification for Support Services to Office...

    Office of Environmental Management (EM)

    Cincinnati - The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and ...

  10. Task Order Awarded for Technical Support Services | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 26, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 ... Services to be performed under the task order include: D&D strategic planning; D&D mission ...

  11. Competition Advocates and Task-Order and Delivery Order Ombudsman |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Acquisition Management Competition Advocates and Task-Order and Delivery Order Ombudsman There are two senior agency positions dedicated to ensuring full and open competition as a part of the federal contracting process: Competition Advocates and Task-Order and Delivery Order Ombudsman. Competition Advocates are responsible for: Promoting full and open competition; Promoting the acquisition of commercial items; Removing barriers to full and

  12. Joint Outreach Task Group Former Workers Screening Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Former Workers Screening Program Joint Outreach Task Group Former Workers Screening Program The Joint Outreach Task Group (JOTG) includes representatives from DOE, Department of Labor (DOL), the National Institute for Occupational Safety and Health (NIOSH), the Offices of the Ombudsman for DOL and NIOSH, and the DOE-funded FWP projects. The JOTG was established in 2009 under the premise that agencies/programs with common goals can work together by combining resources and coordinating

  13. Secretary Chu Tasks Environmental, Industry and State Leaders to Recommend

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Best Practices for Safe, Responsible Development of America's Onshore Natural Gas Resources | Department of Energy Tasks Environmental, Industry and State Leaders to Recommend Best Practices for Safe, Responsible Development of America's Onshore Natural Gas Resources Secretary Chu Tasks Environmental, Industry and State Leaders to Recommend Best Practices for Safe, Responsible Development of America's Onshore Natural Gas Resources May 5, 2011 - 12:00am Addthis Washington, D.C. -- U.S. Energy

  14. UniTech Task Order Modifications - DT0010421 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UniTech Task Order Modifications - DT0010421 DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives UniTech Task Order Modifications - DT0010421 Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 0006 The purpose of this modification is to provide $334,072.91 of incremental funding for the base period, for line item 0002 WRPS Laundry

  15. Heat pipe radiation cooling evaluation: Task 2 concept studies report

    SciTech Connect (OSTI)

    Silverstein, C.C.

    1991-10-01

    This report presents the result of Task 2, Concept Studies for Heat Pipe Radiation Cooling (HPRC), which was performed for Los Alamos National Laboratory under Contract 9-XT1-U9567. Studies under a prior contract defined a reference HPRC conceptual design for hypersonic aircraft engines operating at Mach 5 and an altitude of 80,000 ft. Task 2 involves the further investigation of heat pipe radiation cooling (HPRC) systems for additional design and operating conditions.

  16. SCM Forcing Data Derived from NWP Analyses

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Jakob, Christian

    2008-01-15

    Forcing data, suitable for use with single column models (SCMs) and cloud resolving models (CRMs), have been derived from NWP analyses for the ARM (Atmospheric Radiation Measurement) Tropical Western Pacific (TWP) sites of Manus Island and Nauru.

  17. Force 9 Energy | Open Energy Information

    Open Energy Info (EERE)

    9 Energy Jump to: navigation, search Name: Force 9 Energy Place: Amersham, United Kingdom Zip: HP7 0UT Sector: Wind energy Product: Joint owner of Abercairny windfarm development....

  18. Micromechanical apparatus for measurement of forces (Patent)...

    Office of Scientific and Technical Information (OSTI)

    deflection element (e.g. a ring or annulus) suspended above a substrate for deflection by an applied force, and one or more distance scales for optically measuring the deflection. ...

  19. Solar Trackers at Nellis Air Force Base

    Broader source: Energy.gov [DOE]

    This photograph features one of many SunPower T20 Tracker that are part of the 14.2-megawatt photovoltaic (PV) systems installed at Nellis Air Force Base in Nevada, which was the largest PV system...

  20. Interpretation of long-range interatomic force

    SciTech Connect (OSTI)

    Buldum, A.; Ciraci, S.; Fong, C.Y.; Nelson, J.S.

    1999-02-01

    Recent direct mechanical measurements of atomic force microscopy showed that the force between the silicon tip and the silicon sample is long range in the attractive region and its magnitude at maximum is relatively smaller. These features disagree with previous theoretical predictions based on the {ital ab initio} calculations. We investigated the nature of forces between a silicon tip and the silicon (111)-(2{times}1) surface by performing first-principles pseudopotential and classical molecular dynamics calculations and by calculating the van der Waals interaction. The first two methods give forces that are short range in nature. Fair agreement between the experiment and theory is obtained when the van der Waals interaction is included. The effect of the tip induced deformation is analyzed. {copyright} {ital 1999} {ital The American Physical Society}

  1. protective force | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    The Protective Force successfully completed a recent assessment by the U.S. Department of Energy's Office of Enterprise Assessments. The Pantex Plant recently hosted the U.S. ...

  2. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    SciTech Connect (OSTI)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie, bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.

  3. Restoring a disappearing ecosystem: the Longleaf Pine Savanna.

    SciTech Connect (OSTI)

    Harrington, Timothy B.; Miller, Karl V.; Park, Noreen

    2013-05-01

    Longleaf pine (Pinus palustris) savannas of the southeastern United States contain some of the worlds most diverse plant communities, along with a unique complement of wildlife. Their traditionally open canopy structure and rich understory of grasses and herbs were critical to their vigor. However, a long history of land-use practices such as logging, farming, and fire exclusion have reduced this once-widespread ecosystem to only 3 percent of its original range. At six longleaf pine plantations in South Carolina, Tim Harrington with the Pacific Northwest Research Station and collaborators with the Southern Research Station used various treatments (including prescribed burns, tree thinning, and herbicide applications) to alter the forest structure and tracked how successful each one was in advancing savanna restoration over a 14-year period. They found that typical planting densities for wood production in plantations create dense understory shade that excludes many native herbaceous species important to savannas and associated wildlife. The scientists found that although tree thinning alone did not result in sustained gains, a combination of controlled burning, thinning, and herbicide treatments to reduce woody plants was an effective strategy for recovering the savanna ecosystem. The scientists also found that these efforts must be repeated periodically for enduring benefits.

  4. Data Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  5. Restoration of Secondary Containment in Double Shell Tank (DST) Pits

    SciTech Connect (OSTI)

    SHEN, E.J.

    2000-10-05

    Cracks found in many of the double-shell tank (DST) pump and valve pits bring into question the ability of the pits to provide secondary containment and remain in compliance with State and Federal regulations. This study was commissioned to identify viable options for maintain/restoring secondary containment capability in these pits. The basis for this study is the decision analysis process which identifies the requirements to be met and the desired goals (decision criteria) that each option will be weighed against. A facilitated workshop was convened with individuals knowledgeable of Tank Farms Operations, engineering practices, and safety/environmental requirements. The outcome of this workshop was the validation or identification of the critical requirements, definition of the current problem, identification and weighting of the desired goals, baselining of the current repair methods, and identification of potential alternate solutions. The workshop was followed up with further investigations into the potential solutions that were identified in the workshop and through other efforts. These solutions are identified in the body of this report. Each of the potential solutions were screened against the list of requirements and only those meeting the requirements were considered viable options. To expand the field of viable options, hybrid concepts that combine the strongest features of different individual approaches were also examined. Several were identified. The decision analysis process then ranked each of the viable options against the weighted decision criteria, which resulted in a recommended solution. The recommended approach is based upon installing a sprayed on coating system.

  6. Restoration and testing of an HTS fault current controller

    SciTech Connect (OSTI)

    Waynert, J. A.; Boenig, H.; Mielke, C. H.; Willis, J. O.; Burley, B. L.

    2002-01-01

    A three-phase, 1200 A, 12.5 kV fault current controller using three HTS 4 mH coils, was built by industry and tested in 1999 at the Center Substation of Southern California Edison in Norwalk, CA. During the testing, it appeared that each of the three single-phase units had experienced a voltage breakdown, one externally and two internally. Los Alamos National Laboratory (LANL) was asked by DOE to restore the operation of the fault current controller provided the HTS coils had not been damaged during the initial substation tests. When the internally-failed coil vacuum vessels were opened it became evident that in these two vessels, a flashover had occurred at the high voltage bus section leading to the terminals of the superconducting coil. An investigation into the failure mechanism resulted in six possible causes for the flashover. Based on these causes, the high voltage bus was completely redesigned. Single-phase tests were successfully performed on the modified unit at a 13.7 kV LANL substation. This paper presents the postulated voltage flashover failure mechanisms, the new high voltage bus design which mitigates the failure mechanisms, the sequence of tests used to validate the new design, and finally, the results of variable load and short-circuit tests with the single-phase unit operating on the LANL 13.7 kV substation.

  7. Environmental monitoring, restoration and assessment: What have we learned

    SciTech Connect (OSTI)

    Gray, R.H.

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

  8. Attack optimization at moderate force levels

    SciTech Connect (OSTI)

    Canavan, G.H.

    1997-04-01

    Optimal offensive missile allocations for moderate offensive and defensive forces are derived and used to study their sensitivity to force structure parameters levels. It is shown that the first strike cost is a product of the number of missiles and a function of the optimum allocation. Thus, the conditions under which the number of missiles should increase or decrease in time is also determined by this allocation.

  9. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can make decision bit must notify DOE of intent of restructuring 101-200 employees DOE/NNSA field office is authorized to provide approval 201-500 employees LM is authorized to provide approval and NNSA Administrator is authorized to provide approval for NNSA work force restructurings in consultation with LM 501 and above employees Under Secretary/NNSA Administrator approval required

  10. Micromechanical apparatus for measurement of forces

    DOE Patents [OSTI]

    Tanner, Danelle Mary; Allen, James Joe

    2004-05-25

    A new class of micromechanical dynamometers has been disclosed which are particularly suited to fabrication in parallel with other microelectromechanical apparatus. Forces in the microNewton regime and below can be measured with such dynamometers which are based on a high-compliance deflection element (e.g. a ring or annulus) suspended above a substrate for deflection by an applied force, and one or more distance scales for optically measuring the deflection.

  11. San Joaquin River Up-Stream DO TMDL Project Task 4: MonitoringStudy Interim Task Report #3

    SciTech Connect (OSTI)

    Stringfellow, William; Borglin, Sharon; Dahlgren, Randy; Hanlon,Jeremy; Graham, Justin; Burks, Remie; Hutchinson, Kathleen

    2007-03-30

    The purpose of the Dissolved Oxygen Total Maximum Daily LoadProject (DO TMDLProject) is to provide a comprehensive understanding ofthe sources and fate of oxygen consuming materials in the San JoaquinRiver (SJR) watershed between Channel Point and Lander Avenue (upstreamSJR). When completed, this study will provide the stakeholders anunderstanding of the baseline conditions of the basin, provide input foran allocation decision, and provide the stakeholders with a tool formeasuring the impact of any waterquality management program that may beimplemented as part of the DO TMDL process. Previous studies haveidentified algal biomass as the most significant oxygen-demandingsubstance in the DO TMDL Project study-area between of Channel Point andLander Ave onthe SJR. Other oxygen-demanding substances found in theupstream SJR include ammonia and organic carbon from sources other thanalgae. The DO TMDL Project study-area contains municipalities, dairies,wetlands, cattle ranching, irrigated agriculture, and industries thatcould potentially contribute biochemical oxygen demand (BOD) to the SJR.This study is designed to discriminate between algal BOD and othersources of BOD throughout the entire upstream SJR watershed. Algalbiomass is not a conserved substance, but grows and decays in the SJR;hence, characterization of oxygen-demanding substances in the SJR isinherently complicated and requires an integrated effort of extensivemonitoring, scientific study, and modeling. In order to achieve projectobjectives, project activities were divided into a number of Tasks withspecific goals and objectives. In this report, we present the results ofmonitoring and research conducted under Task 4 of the DO TMDL Project.The major objective of Task 4 is to collect sufficient hydrologic (flow)and water quality (WQ) data to characterize the loading of algae, otheroxygen-demanding materials, and nutrients fromindividual tributaries andsub-watersheds of the upstream SJR between Mossdale and

  12. Ecological outcomes and evaluation of success in passively restored southeastern depressional wetlands.

    SciTech Connect (OSTI)

    De Steven, Diane; Sharitz, Rebecca R.; Barton, Christopher, D.

    2010-11-01

    Abstract: Depressional wetlands may be restored passively by disrupting prior drainage to recover original hydrology and relying on natural revegetation. Restored hydrology selects for wetland vegetation; however, depression geomorphology constrains the achievable hydroperiod, and plant communities are influenced by hydroperiod and available species pools. Such constraints can complicate assessments of restoration success. Sixteen drained depressions in South Carolina, USA, were restored experimentally by forest clearing and ditch plugging for potential crediting to a mitigation bank. Depressions were assigned to alternate revegetation methods representing desired targets of herbaceous and wet-forest communities. After five years, restoration progress and revegetation methods were evaluated. Restored hydroperiods differed among wetlands, but all sites developed diverse vegetation of native wetland species. Vegetation traits were influenced by hydroperiod and the effects of early drought, rather than by revegetation method. For mitigation banking, individual wetlands were assessed for improvement from pre-restoration condition and similarity to assigned reference type. Most wetlands met goals to increase hydroperiod, herb-species dominance, and wetland-plant composition. Fewer wetlands achieved equivalence to reference types because some vegetation targets were incompatible with depression hydroperiods and improbable without intensive management. The results illustrated a paradox in judging success when vegetation goals may be unsuited to system constraints.

  13. Waste generation forecast for DOE-ORO`s Environmental Restoration OR-1 Project: FY 1995-FY 2002, September 1994 revision

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    A comprehensive waste-forecasting task was initiated in FY 1991 to provide a consistent, documented estimate of the volumes of waste expected to be generated as a result of U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) Environmental Restoration (ER) OR-1 Project activities. Continual changes in the scope and schedules for remedial action (RA) and decontamination and decommissioning (D&D) activities have required that an integrated data base system be developed that can be easily revised to keep pace with changes and provide appropriate tabular and graphical output. The output can then be analyzed and used to drive planning assumptions for treatment, storage, and disposal (TSD) facilities. The results of this forecasting effort and a description of the data base developed to support it are provided herein. The initial waste-generation forecast results were compiled in November 1991. Since the initial forecast report, the forecast data have been revised annually. This report reflects revisions as of September 1994.

  14. Environmental Restoration/Waste Management - applied technology. Semiannual report, July 1992--June 1993, Volume 1, Number 2, and Volume 2, Number 1

    SciTech Connect (OSTI)

    Murphy, P.W.; Bruner, J.M.; Price, M.E.; Talaber, C.J.

    1993-12-31

    The Environmental Restoration/Waste Management-Applied Technology (ER/WM-AT) Program is developing restoration and waste treatment technologies needed for the ongoing environmental cleanup of the Department of Energy (DOE) complex and treatment technologies for wastes generated in the nuclear weapons production complex. These technologies can find application to similar problems nationally and even worldwide. They can be demonstrated at the Livermore site, which mirrors (on a small scale) many of the environmental and waste management problems of the rest of the DOE complex. Their commercialization should speed cleanup, and the scope of the task should make it attractive to US industry. The articles in this semi-annual report cover the following areas: ceramic final forms for residues of mixed waste treatment; treatment of wastes containing sodium nitrate; actinide volatility in thermal oxidation processes; in situ microbial filters for remediating contaminated soils; collaboration with scientists in the former Soviet Union on new ER/WM technologies; and fiber-optic sensors for chlorinated organic solvents.

  15. Development of a Hydrodynamic and Transport model of Bellingham Bay in Support of Nearshore Habitat Restoration

    SciTech Connect (OSTI)

    Wang, Taiping; Yang, Zhaoqing; Khangaonkar, Tarang

    2010-04-22

    root mean square error values for surface elevation, velocity, temperature, and salinity time series are 0.11 m, 0.10 m/s, 1.28oC, and 1.91 ppt, respectively. The model was able to reproduce the salinity and temperature stratifications inside Bellingham Bay. Wetting and drying processes in tidal flats in Bellingham Bay, Samish Bay, and Padilla Bay were also successfully simulated. Both model results and observed data indicated that water surface elevations inside Bellingham Bay are highly correlated to tides. Circulation inside the bay is weak and complex and is affected by various forcing mechanisms, including tides, winds, freshwater inflows, and other local forcing factors. The Bellingham Bay model solution was successfully linked to the NOAA oil spill trajectory simulation model General NOAA Operational Modeling Environment (GNOME). Overall, the Bellingham Bay model has been calibrated reasonably well and can be used to provide detailed hydrodynamic information in the bay and adjacent water bodies. While there is room for further improvement with more available data, the calibrated hydrodynamic model provides useful hydrodynamic information in Bellingham Bay and can be used to support sediment transport and water quality modeling as well as assist in the design of nearshore restoration scenarios.

  16. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    SciTech Connect (OSTI)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  17. Sandy River Delta Habitat Restoration : Annual Report, January 2008 - March 2009.

    SciTech Connect (OSTI)

    Dobson, Robin

    2009-09-11

    During the period 2008-2009, there were 2 contracts with BPA. One (38539) was dealing with the restoration work for 2007 and the other (26198) was an extension on the 2006 contract including the NEPA for Dam removal on the old channel of the Sandy River. For contract 38539, the Sandy River Delta Habitat Restoration project continued its focus on riparian hardwood reforestation with less emphasis on wetlands restoration. Emphasis was placed on Sundial Island again due to the potential removal of the dike and the loss of access in the near future. AshCreek Forest Management was able to leverage additional funding from grants to help finance the restoration effort; this required a mid year revision of work funded by BPA. The revised work not only continued the maintenance of restored hardwood forests, but was aimed to commence the restoration of the Columbia River Banks, an area all along the Columbia River. This would be the final restoration for Sundial Island. The grant funding would help achieve this. Thus by 2011, all major work will have been completed on Sundial Island and the need for access with vehicles would no longer be required. The restored forests continued to show excellent growth and development towards true riparian gallery forests. Final inter-planting was commenced, and will continue through 2010 before the area is considered fully restored. No new wetland work was completed. The wetlands were filled by pumping in early summer to augment the water levels but due to better rainfall, no new fuel was required to augment existing. Monitoring results continued to show very good growth of the trees and the restoration at large was performing beyond expectations. Weed problems continue to be the most difficult issue. The $100,000 from BPA planned for forest restoration in 2008, was augmented by $25,000 from USFS, $120,000 from OR150 grant, $18,000 from LCREP, and the COE continued to add $250,000 for their portion. Summary of the use of these funds are

  18. Dictionary construction in sparse methods for image restoration

    SciTech Connect (OSTI)

    Wohlberg, Brendt

    2010-01-01

    Sparsity-based methods have achieved very good performance in a wide variety of image restoration problems, including denoising, inpainting, super-resolution, and source separation. These methods are based on the assumption that the image to be reconstructed may be represented as a superposition of a few known components, and the appropriate linear combination of components is estimated by solving an optimization such as Basis Pursuit De-Noising (BPDN). Considering that the K-SVD constructs a dictionary which has been optimised for mean performance over a training set, it is not too surprising that better performance can be achieved by selecting a custom dictionary for each individual block to be reconstructed. The nearest neighbor dictionary construction can be understood geometrically as a method for estimating the local projection into the manifold of image blocks, whereas the K-SVD dictionary makes more sense within a source-coding framework (it is presented as a generalization of the k-means algorithm for constructing a VQ codebook), is therefore, it could be argued, less appropriate in principle, for reconstruction problems. One can, of course, motivate the use of the K-SVD in reconstruction application on practical grounds, avoiding the computational expense of constructing a different dictionary for each block to be denoised. Since the performance of the nearest neighbor dictionary decreases when the dictionary becomes sufficiently large, this method is also superior to the approach of utilizing the entire training set as a dictionary (and this can also be understood within the image block manifold model). In practical terms, the tradeoff is between the computational cost of a nearest neighbor search (which can be achieved very efficiently), or of increased cost at the sparse optimization.

  19. United States of America, Department of Energy Environmental Restoration and Waste Management Advisory Committee Public Meeting

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This report is a transcript of the public hearing of the US DOE Environmental Restoration and Waste Management Advisory Committee held in Golden, Colorado June 16--18, 1993.

  20. Preparation plan, preliminary safety documentation, tank farm restoration and safe operations, Project W-314

    SciTech Connect (OSTI)

    Kidder, R.J.

    1994-10-20

    This preparation plan is developed to establish planning for the preliminary safety documentation for Project W-314, {open_quotes}Tank Farm Restoration and Safe Operations.{close_quotes}