Sample records for resources management plan

  1. Natural Resource Management Plan Update

    E-Print Network [OSTI]

    Homes, Christopher C.

    wood industry, some farming in area of Solar Farm 3 #12;History of Natural Resource Management Formal

  2. Hanford cultural resources management plan

    SciTech Connect (OSTI)

    Chatters, J.C. (ed.)

    1989-06-01T23:59:59.000Z

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  3. Nevada Test Site Resource Management Plan

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  4. BSBA IN MANAGEMENT -HUMAN RESOURCE MANAGEMENT SPECIALIZATION ASSESSMENT PLAN

    E-Print Network [OSTI]

    Gallo, Linda C.

    BSBA IN MANAGEMENT - HUMAN RESOURCE MANAGEMENT SPECIALIZATION ASSESSMENT PLAN (REV. 7 in Human Resource Management (HRM), the goal is to provide a foundation of all areas of human resources countries. · Content Delivered in: MGT 350, MGT 405, & MGT 357. · Assessment Method: Culminating exam

  5. Project Management Plan Project Title: Natural Resources Management

    E-Print Network [OSTI]

    US Army Corps of Engineers

    DEFINITION. The NRM Gateway is a knowledge management resource, designed to serve the needs of the NRMP; Preserve institutional knowledge; Develop practical and agency-approved webpages that provide usefulProject Management Plan Project Title: Natural Resources Management (NRM) Gateway Website

  6. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect (OSTI)

    Julie Braun Williams

    2013-02-01T23:59:59.000Z

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

  7. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect (OSTI)

    Lowrey, Diana Lee

    2011-02-01T23:59:59.000Z

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

  8. Idaho National Laboratory Cultural Resource Management Plan

    SciTech Connect (OSTI)

    Lowrey, Diana Lee

    2009-02-01T23:59:59.000Z

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

  9. Water resource management planning guide for Savannah River Plant

    SciTech Connect (OSTI)

    Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.); Gordon, D.E. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant)

    1988-10-01T23:59:59.000Z

    The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

  10. Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources

    E-Print Network [OSTI]

    Guiltinan, Mark

    v.08.2011 Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources to nutrient management specialists. These resources serve two purposes: Education. These factsheets and publications are selected to supplement

  11. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect (OSTI)

    NONE

    2000-01-01T23:59:59.000Z

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  12. BLM - Approved Resource Management Plan Amendments/Record of...

    Open Energy Info (EERE)

    Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference LibraryAdd to...

  13. Natural Resource Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    green, T.

    2011-08-15T23:59:59.000Z

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

  14. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    GREEN,T.ET AL.

    2003-12-31T23:59:59.000Z

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  15. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    DAVIS, M.

    2005-04-01T23:59:59.000Z

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  16. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    SciTech Connect (OSTI)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01T23:59:59.000Z

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  17. Resource management plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))

    1992-06-01T23:59:59.000Z

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

  18. Management Plan Management Plan

    E-Print Network [OSTI]

    Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids

  19. Environmental Guidelines for Development of Cultural Resource Management Plans--Update

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-09-22T23:59:59.000Z

    This Guide provides guidelines for the development of an individual Cultural Resource Management Plan for each DOE facility and program. Canceled by DOE N 251.82.

  20. State Solid Waste Management and Resource Recovery Plan (Montana)

    Broader source: Energy.gov [DOE]

    The State supports the "good management of solid waste and the conservation of natural resources through the promotion or development of systems to collect, separate, reclaim, recycle, and dispose...

  1. Environmental guidelines for development of Cultural Resource Management plans. Final report

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The purpose of this document is to provide guidelines to the DOE field managements with responsibility for the development of an individual Cultural Resource Management Plan for each DOE facility and program.

  2. Information Resources Management Strategic Plan FY2014-2018

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov.Energy02.pdf7 OPAM Flash2011-37EnergySubmitRoad2007Department, 2008 TO:Plan

  3. North Slope Decision Support for Water Resource Planning and Management

    SciTech Connect (OSTI)

    Schnabel, William; Brumbelow, Kelly

    2013-03-31T23:59:59.000Z

    The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaskas North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaskas North Slope.

  4. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  5. Rangeland Resource Management for Texans: Strategic Planning for Success (Spanish)

    E-Print Network [OSTI]

    Fox, William E.

    2004-12-22T23:59:59.000Z

    esas desviaciones no causen tanto da?o como para hacer que sus metas sean inalcanzables. Tener un plan a seguir, bien elaborado puede hacer la toma diaria de decisiones un poco menos dificil. Estableciendo Planes de Contingencia Un administrador sabio...

  6. Recommended Academic Plan for the Environmental Resource Management -Soil Science Option (E R M/SOIL)

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for the Environmental Resource Management - Soil Science Option (E R M/SOIL of Calculus I or MATH 140* (GQ) Calculus With Analytic Geometry I 4 SOILS 101 (GN) Introductory Soil Science 3 AG 150S (First-Year Seminar) Be a Master Student! 2 SOILS 102 Introductory Soil Science Laboratory 1

  7. Rangeland Resource Management for Texans: Strategic Planning for Success

    E-Print Network [OSTI]

    Fox, William E.

    2002-03-04T23:59:59.000Z

    are. The mission should neither limit nor overextend the enterprise. It should be as broad as possible without being unrealistic. Setting Goals Once you have defined your mission you can set goals for fulfilling that mission. The best goals are SMART... attainable? How would you measure success or track progress toward such goals? An example of a SMART goal might be: ?To sustain the resource so that it maintains a 1,200 AU per year productiv- ity over my lifetime.? It is specific. It is measurable over...

  8. Information Resources Management Strategic Plan Appendix FY2014-2018

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov.Energy02.pdf7 OPAM Flash2011-37EnergySubmitRoad2007Department, 2008 TO:

  9. India-Natural Resource Management Plan | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation, search OpenEIHesperia,IDGWP WindSatelliteInSAR JumpRenewable Energy

  10. Glenwood Springs Resource Management Plan (1984) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG Contracting Jump to:Echo, Maryland:Glenwillow, Ohio:

  11. CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2 Chg U.S. S p e c t

  12. CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2 Chg U.S. S p e c t i R y R y

  13. Title 43 CFR 1610 Resource Management Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <MaintainedInformationThePty LtdOpen Energy

  14. DOD Instruction 4715.03 - Integrated Natural Resources Management Plan

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew|CoreCpWingCushing,DADEVELOPMENTItalyIP(INRMP)

  15. Local government involvement in long term resource planning for community energy systems. Demand side management

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  16. Avista 2011 Integrated Resource Plan Clint Kalich

    E-Print Network [OSTI]

    Avista 2011 Integrated Resource Plan Clint Kalich Manager, Resource Planning & Power Supply Other #12;Conservation Avoided Cost Calculations For 1 MW Measure With Flat Delivery Item $/MWh Energy

  17. Identification of Management and Planning Problems of Urban Water Resources in the Metropolitan Area of Greater San Antonio

    E-Print Network [OSTI]

    Garner, K.; Shih, C. S.

    including the inventory and planning control for both surface and ground Water Resource Management of the San Antonio area are presented. Emphasis has been placed upon the identification of the probabilistic nature of various decision-making parameters...

  18. OFFICE OF RESOURCE PLANNING OPERATING BUDGET UNIT

    E-Print Network [OSTI]

    Leng, Chenlei

    OFFICE OF RESOURCE PLANNING Manager Sarah Teo OPERATING BUDGET UNIT Deputy Director (Operating, Strategic Initiatives & Consolidated Budgets) Tay Sok Kian Senior Director Ajith Prasad Senior Associate Initiatives & Research Budgets: (Planning & Budget Management) Revenue Policies & Planning: (Grants

  19. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  20. Information resources management long-range plan, FY1994--1998

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  1. Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-05-16T23:59:59.000Z

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

  2. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-07-11T23:59:59.000Z

    Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

  3. Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields in New Mexico and Wyoming

    SciTech Connect (OSTI)

    Eckerle, William; Hall, Stephen

    2005-12-30T23:59:59.000Z

    In 2002, Gnomon, Inc., entered into a cooperative agreement with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) for a project entitled, Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields in New Mexico and Wyoming (DE-FC26-02NT15445). This project, funded through DOEs Preferred Upstream Management Practices grant program, examined cultural resource management practices in two major oil- and gas-producing areas, southeastern New Mexico and the Powder River Basin of Wyoming (Figure 1). The purpose of this project was to examine how cultural resources have been investigated and managed and to identify more effective management practices. The project also was designed to build information technology and modeling tools to meet both current and future management needs. The goals of the project were described in the original proposal as follows: Goal 1. Create seamless information systems for the project areas. Goal 2. Examine what we have learned from archaeological work in the southeastern New Mexico oil fields and whether there are better ways to gain additional knowledge more rapidly or at a lower cost. Goal 3. Provide useful sensitivity models for planning, management, and as guidelines for field investigations. Goal 4. Integrate management, investigation, and decision- making in a real-time electronic system. Gnomon, Inc., in partnership with the Wyoming State Historic Preservation Office (WYSHPO) and Western GeoArch Research, carried out the Wyoming portion of the project. SRI Foundation, in partnership with the New Mexico Historic Preservation Division (NMHPD), Statistical Research, Inc., and Red Rock Geological Enterprises, completed the New Mexico component of the project. Both the New Mexico and Wyoming summaries concluded with recommendations how cultural resource management (CRM) processes might be modified based on the findings of this research.

  4. ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING

    SciTech Connect (OSTI)

    Peggy Robinson

    2005-07-01T23:59:59.000Z

    This report summarizes activities that have taken place in the last six (6) months (January 2005-June 2005) under the DOE-NETL cooperative agreement ''Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields, New Mexico and Wyoming'' DE-FC26-02NT15445. This project examines the practices and results of cultural resource investigation and management in two different oil and gas producing areas of the United States: southeastern New Mexico and the Powder River Basin of Wyoming. The project evaluates how cultural resource investigations have been conducted in the past and considers how investigation and management could be pursued differently in the future. The study relies upon full database population for cultural resource inventories and resources and geomorphological studies. These are the basis for analysis of cultural resource occurrence, strategies for finding and evaluating cultural resources, and recommendations for future management practices. Activities can be summarized as occurring in either Wyoming or New Mexico. Gnomon as project lead, worked in both areas.

  5. ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING

    SciTech Connect (OSTI)

    Peggy Robinson

    2004-01-01T23:59:59.000Z

    This report contains a summary of activities of Gnomon, Inc. and five subcontractors that have taken place during the second six months (July 1, 2003-December 31, 2003) under the DOE-NETL cooperative agreement: ''Adaptive Management and Planning Models for Cultural Resources in Oil & Gas Fields in New Mexico and Wyoming'', DE-FC26-02NT15445. Although Gnomon and all five subcontractors completed tasks during these six months, most of the technical experimental work was conducted by the subcontractor, SRI Foundation (SRIF). SRIF created a sensitivity model for the Loco Hills area of southeastern New Mexico that rates areas as having a very good chance, a good chance, or a very poor chance of containing cultural resource sites. SRIF suggested that the results of the sensitivity model might influence possible changes in cultural resource management (CRM) practices in the Loco Hills area of southeastern New Mexico.

  6. An approach to understanding, representing, and managing uncertainty in integrated resource planning

    SciTech Connect (OSTI)

    Tonn, B.E. [Oak Ridge National Lab., TN (United States); Schaffhauser, A.J. [Tennessee Univ., Knoxville, TN (United States)

    1994-12-01T23:59:59.000Z

    This report addresses the issue of uncertainty in integrated resource planning (IRP). IRP is a process employed by electric utilities, often at the bellest of Public Utility Commissions (PUCs), to evaluate the acquisition of resources to meet forecast energy demands and other criteria such as energy efficiency and fuel diversity. Uncertainty plagues the preparation of IRPs, from forecasting energy prices and electricity demand to estimating costs and benefits expected from new resource acquisitions. As a result all those involved in the IRP process (including PUC commissioners and staff, utility decision makers, IRP analysts, and experts in particular areas) need to appreciate how uncertainty affects IRP and learn about available techniques to reduce its effects.

  7. Primer on gas integrated resource planning

    SciTech Connect (OSTI)

    Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S. [Lawrence Berkeley Lab., CA (United States)

    1993-12-01T23:59:59.000Z

    This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

  8. What is a business plan? A business plan is a tool used to organize a business idea, resources, management and clients. The tool is meant to plan

    E-Print Network [OSTI]

    Johnson, Eric E.

    at by investors very carefully. It should detail costs, expenses, capital, break-even analysis, estimated cash1 What is a business plan? A business plan is a tool used to organize a business idea, resources do you get the product to your client(s)? What are the costs to make the product? What should

  9. LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAHS UINTA BASIN

    SciTech Connect (OSTI)

    Keiter, Robert; Ruple, John; Holt, Rebecca; Tanana, Heather; McNeally, Phoebe; Tribby, Clavin

    2012-10-01T23:59:59.000Z

    Utah is rich in oil shale and oil sands resources. Chief among the challenges facing prospective unconventional fuel developers is the ability to access these resources. Access is heavily dependent upon land ownership and applicable management requirements. Understanding constraints on resource access and the prospect of consolidating resource holdings across a fragmented management landscape is critical to understanding the role Utahs unconventional fuel resources may play in our nations energy policy. This Topical Report explains the historic roots of the crazy quilt of western land ownership, how current controversies over management of federal public land with wilderness character could impact access to unconventional fuels resources, and how land exchanges could improve management efficiency. Upon admission to the Union, the State of Utah received the right to title to more than one-ninth of all land within the newly formed state. This land is held in trust to support public schools and institutions, and is managed to generate revenue for trust beneficiaries. State trust lands are scattered across the state in mostly discontinuous 640-acre parcels, many of which are surrounded by federal land and too small to develop on their own. Where state trust lands are developable but surrounded by federal land, federal land management objectives can complicate state trust land development. The difficulty generating revenue from state trust lands can frustrate state and local government officials as well as citizens advocating for economic development. Likewise, the prospect of industrial development of inholdings within prized conservation landscapes creates management challenges for federal agencies. One major tension involves whether certain federal public lands possess wilderness character, and if so, whether management of those lands should emphasize wilderness values over other uses. On December 22, 2010, Secretary of the Interior Ken Salazar issued Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Orders implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 are unlikely to profoundly impact oil shale development within Utahs Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those resources found in the southern part of the state. Management requirements independent of l

  10. Resource assessment/commercialization planning meeting

    SciTech Connect (OSTI)

    None

    1980-01-24T23:59:59.000Z

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  11. CULTURAL RESOURCES SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS

    E-Print Network [OSTI]

    D installations. SERVICES Planning level surveys for archaeological resources, traditional cultural properties and structures Integrated Cultural Resource Management Plans (ICRMPs) Archaeological resource monitoringCULTURAL RESOURCES SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML | 1490

  12. Forest Resources and Management

    E-Print Network [OSTI]

    Forest Resources and Management Centre for The Centre for Forest Resources and Management aims the forest resource. Our aim is that British forests from their creation to maturity and regeneration-energy development, forest resource forecasting, genetic improvement, woodland regeneration and creation, management

  13. Project Management Plan Resident Management System (RMS)

    E-Print Network [OSTI]

    US Army Corps of Engineers

    1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

  14. Waste Management Quality Assurance Plan

    E-Print Network [OSTI]

    Waste Management Group

    2006-01-01T23:59:59.000Z

    Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

  15. Community Energy Stategic Planning Resources

    Broader source: Energy.gov (indexed) [DOE]

    Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

  16. BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN

    E-Print Network [OSTI]

    Florida, University of

    BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

  17. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    E-Print Network [OSTI]

    Barbose, Galen

    2009-01-01T23:59:59.000Z

    Cost and Risk: The Treatment of Renewable Energy in Westernand Risk Management in the US Electricity Sector, Energyhow energy planners might better address and manage the risk

  18. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    Cost and Risk: The Treatment of Renewable Energy in Westernand Risk Management in the US Electricity Sector, Energyhow energy planners might better address and manage the risk

  19. Evolution and Evaluation of the Active Management Area Management Plans

    E-Print Network [OSTI]

    Fay, Noah

    Evolution and Evaluation of the Active Management Area Management Plans FINAL January 2008 Sharon B with a grant from the Arizona Water Institute and by the Arizona Department of Water Resources #12;Evolution 1 Methodology 2 Management Plan Purpose and Intent 4 Evolution and Evaluation of the Management Plan

  20. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24T23:59:59.000Z

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

  1. 194 / JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT / JULY/AUGUST 1999 INDICATORS OF IMPACTS OF GLOBAL CLIMATE CHANGE ON U.S.

    E-Print Network [OSTI]

    Vogel, Richard M.

    194 / JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT / JULY/AUGUST 1999 INDICATORS OF IMPACTS of the indicators, regional reservoir storage vulnerability, is a particularly useful index summarizing (U.S.) to investigate the integrated impacts of potential global warming on water resources. Impacts

  2. MOWII Webinar: Wind Development Cultural Resource Management

    Broader source: Energy.gov [DOE]

    During the planning stages, wind energy development can be affected by the regulatory process relative to cultural resource management issues. Section 106 of the National Historic Preservation Act ...

  3. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    planning. First, early retirement of a utilitys own coal-would justify the early retirement of their own coal-fired

  4. Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States

    E-Print Network [OSTI]

    Barbose, Galen

    2009-01-01T23:59:59.000Z

    planning. First, early retirement of a utilitys own coal-would justify the early retirement of their own coal-fired

  5. Best Management Practice #1: Water Management Planning

    Broader source: Energy.gov [DOE]

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  6. Energy planning and management plan

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  7. Integrated Resource Planning: A Dialogue with ELCON

    E-Print Network [OSTI]

    Treadway, N.; Torrent, G.

    the building of generating units. Planning decisions would now include alternative energy sources 2 and demand side management. Also very important in the IRP process is the evaluation of external impacts of any planning decision with a special focus... and demand resources in electricity markets. In this paper we provide a definition of that concept and discuss two of its main features: Demand-side Management programs and environmental externalities. We also examine a number of positions taken by ELCON...

  8. Community Energy Strategic Planning Resources

    Broader source: Energy.gov [DOE]

    Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

  9. DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan

    E-Print Network [OSTI]

    DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN............................................... 38 5.5.2. Consistency with the Clean Water Act, Total Maximum Daily Loads and Existing Water Quality

  10. Journal of Water Resources Planning and Management, Vol. 125, No. 3, pp. 143-153, May/June 1999 Some Derived Operating Rules for Reservoirs

    E-Print Network [OSTI]

    Pasternack, Gregory B.

    1 Journal of Water Resources Planning and Management, Vol. 125, No. 3, pp. 143-153, May/June 1999 for reservoirs in series and in parallel for water supply, flood control, hydropower, water quality-term operation for hydropower production and energy storage. For reservoirs in parallel, additional new special

  11. Proposed Resource Management Plan/Final Environmental Impact Statement for the Ely District

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNL 2001a,Summary; i-C C1 1 1 14Ely

  12. BLM - Approved Resource Management Plan Amendments/Record of Decision for

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions Inc Jump to:AurigaPlantillas JumpBESolar Energy Development in

  13. Public involvement in integrated resource planning: A study of demand-side management collaboratives

    SciTech Connect (OSTI)

    Raab, J. (Raab (J.), Boston, MA (United States)); Schweitzer, M. (Oak Ridge National Lab., TN (United States))

    1992-02-01T23:59:59.000Z

    Many utilities and nonutility parties (NUPs) across the country have tried a new approach to reaching agreement on Demand-Side Management (DSM) program design and policy issues. Through this, which is called the DSM collaborative process, parties who have often been adversaries in the past attempt to reach consensus rather than using traditional litigation to resolve differences. We examined nine cases of DSM collaboration involving 24 utilities and approximately 50 NUPs in 10 states. This is the first comprehensive, in-depth review and assessment of collaboratives and it allows conclusions to be drawn about the collaborative process and the factors that contribute to successful efforts of this type. Collaboratives are described in terms of four major contextual and organizational characteristics: regulatory and legal history, parties involved and parties excluded, collaborative scope, and the collaborative process itself.

  14. Groundwater protection management program plan

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  15. Resource management plan for the Oak Ridge Reservation. Volume 29, Rare plants on the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Cunningham, M. [Science Applications International Corp., Oak Ridge, TN (United States); Pounds, L. [Tennessee Univ., Knoxville, TN (United States); Oberholster, S. [USDA Forest Service, Montgomery, AL (United States); Parr, P.; Mann, L. [Oak Ridge National Lab., TN (United States); Edwards, L. [Clemson Univ., SC (United States). Dept. of Forestry; Rosensteel, B. [JAYCOR Environmental, Vienna, VA (United States)

    1993-08-01T23:59:59.000Z

    Rare plant species listed by state or federal agencies and found on or near the Department of Energy`s Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated.

  16. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

    2008-02-01T23:59:59.000Z

    The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to actively assess carbon regulatory risk within their resource planning processes, and to evaluate options for mitigating that risk. However, given the relatively recent emergence of this issue and the rapidly changing political landscape, methods and assumptions used to analyze carbon regulatory risk, and the impact of this analysis on the selection of a preferred resource portfolio, vary considerably across utilities. In this study, we examine the treatment of carbon regulatory risk in utility resource planning, through a comparison of the most-recent resource plans filed by fifteen investor-owned and publicly-owned utilities in the Western U.S. Together, these utilities account for approximately 60percent of retail electricity sales in the West, and cover nine of eleven Western states. This report has two related elements. First, we compare and assess utilities' approaches to addressing key analytical issues that arise when considering the risk of future carbon regulations. Second, we summarize the composition and carbon intensity of the preferred resource portfolios selected by these fifteen utilities and compare them to potential CO2 emission benchmark levels.

  17. Human Resource Management Delegation

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-06-28T23:59:59.000Z

    The notice is to clarifies and updates existing Human Resource Management Delegation Authorities and the levels to which they are delegated. Expired 6-28-97. Does not cancel any directives.

  18. Management Plan Supplement Yakima Subbasin Plan

    E-Print Network [OSTI]

    #12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

  19. Integrated Resource Planning Model (IRPM)

    SciTech Connect (OSTI)

    Graham, T. B.

    2010-04-01T23:59:59.000Z

    The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

  20. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  1. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  2. RENEWABLE ENERGY RESOURCES PROCUREMENT PLAN This Renewable Energy Resources Procurement Plan ("RPS Procurement Plan" or

    E-Print Network [OSTI]

    : Eligible Renewable Energy Resources Biodiesel Fuel cells using renewable fuels Ocean wave, ocean thermalRENEWABLE ENERGY RESOURCES PROCUREMENT PLAN This Renewable Energy Resources Procurement Plan ("RPS California's electric utilities and other retail sellers to procure eligible renewable energy resources so

  3. Energy Management and Conservation Plan

    E-Print Network [OSTI]

    Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

  4. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    with New Renewable Resources 18Portfolios with New Renewable Resources No. of Candidateportfolios with new renewable resources comprising, at most,

  5. Performance Demonstration Program Management Plan

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2005-07-01T23:59:59.000Z

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organizations quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  6. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  7. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  8. Massachusetts Ocean Management Plan (Massachusetts)

    Broader source: Energy.gov [DOE]

    The Massachusetts Ocean Act of 2008 required the states Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

  9. Rangeland Resource Management for Texans: Total Resource Management

    E-Print Network [OSTI]

    Hanselka, C. Wayne; Fox, William E.; White, Larry D.

    2004-03-26T23:59:59.000Z

    The Total Resource Management approach helps ranchers make strategic, tactical and operational decisions for the best, most cost-effective use of resources. This publication offers step-by-step directions for implementing TRM for a profitable...

  10. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    expiring geothermal, small hydro, and biomass contracts).Plan Needs Geothermal Small Hydro or Upgrade Biomass Windwith geothermal, and four with small hydro or upgrades to

  11. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    Plan Needs Geothermal Small Hydro or Upgrade Biomass Windwith geothermal, and four with small hydro or upgrades toexpiring geothermal, small hydro, and biomass contracts).

  12. Project Management Plan Solution Stabilization

    SciTech Connect (OSTI)

    SATO, P.K.

    1999-08-31T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  13. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

  14. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

  15. Project Management Plan Chinese Food

    E-Print Network [OSTI]

    Igusa, Kiyoshi

    impact of this project? Data management: How do we collect, preserve and sort all of the files? Which special equipment, facilities needed or wanted? According to http://project-management-knowledge.com/ weProject Management Plan Chinese Food According to NSF, the basic elements of a project management

  16. UNC Charlotte Government Property Management Plan 1 Government Property Management Plan

    E-Print Network [OSTI]

    Howitt, Ivan

    . MANAGEMENT AND ACQUISITION Under the University's property management system, the Materials ManagementUNC Charlotte Government Property Management Plan 1 Government Property Management Plan Initially approved: 21 October 2011 Updated: August 24, 2012 SCOPE This Government Property Management Plan applies

  17. Resource portfolio management: bundling process

    E-Print Network [OSTI]

    Worthington, William John

    2009-05-15T23:59:59.000Z

    Managers within firms seek to align their portfolio of capabilities to best respond to their competitive environment. Processes used by firms to acquire resources, bundle those resources into capabilities, and then leverage those capabilities...

  18. Information resource management concepts for records managers

    SciTech Connect (OSTI)

    Seesing, P.R.

    1992-10-01T23:59:59.000Z

    Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management`s goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

  19. Environmental Management System Plan

    E-Print Network [OSTI]

    Fox, Robert

    2009-01-01T23:59:59.000Z

    Management Program, R-3 Environmental Management SystemEnvironmental policy 3. Environmental aspects 4. Legal andObjectives, targets, and Environmental Management Programs

  20. Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans

    E-Print Network [OSTI]

    Barbose, Galen

    2008-01-01T23:59:59.000Z

    Cost and Risk: The Treatment of Renewable Energy in Westernand Risk Management in the US Electricity Sector, Energyof energy efficiency in mitigating carbon regulatory risk (

  1. Information resource management concepts for records managers

    SciTech Connect (OSTI)

    Seesing, P.R.

    1992-10-01T23:59:59.000Z

    Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management's goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

  2. Supply-side Resources & Planning Assumptions

    E-Print Network [OSTI]

    - station Solar PV (from 6th Plan) 25 MW dc/20 MW net ac output using flat plate non concentrating single) Storage Resource assessment data needs and applications R d f t Resources proposed for assessment Forecasts ProCost 46/19/2013 #12;6/19/2013 3 Resource data & planning assumptions Reference plant (New

  3. Records Management Plan Lawrence Berkeley National Laboratory

    E-Print Network [OSTI]

    Records Management Plan Page 1 Lawrence Berkeley National Laboratory Environment, Health and Safety Division Environmental Services Group Environmental Restoration Program Records Management Plan May 2007 #12;#12;Records Management Plan Page 3 TABLE OF CONTENTS 1 INTRODUCTION

  4. Environmental Management System Plan

    E-Print Network [OSTI]

    Fox, Robert

    2009-01-01T23:59:59.000Z

    and locations chemicals are used as well as information about emergency plans and procedures. The current Hazardous

  5. Ground water protection management program plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

  6. AVLIS production plant waste management plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15T23:59:59.000Z

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  7. Resources for Fleet Managers

    Broader source: Energy.gov [DOE]

    Fleet managers will benefit from the lower fuel costs, more reliable fuel prices, and lower emissions that come from using alternative fuels and advanced technologies made possible through the work...

  8. The process of integrated resource planning for electric utilities

    SciTech Connect (OSTI)

    Schweitzer, M.; Hirst, E. (Oak Ridge National Lab., TN (USA)); Yourstone, E. (Yourstone (Evelin), Albuquerque, NM (USA))

    1990-01-01T23:59:59.000Z

    This paper identifies six key issues in utility integrated resource planning that are expected to influence a plan's societal value and discusses the first four, which are related to the planning process. They are: (1) the relative emphasis placed on supply- and demand-side resources throughout the planning process; (2) the breadth of inputs considered during plan preparation from various in-house departments and non-utility interests; (3) the criteria used to select options for resource plans; and (4) the uncertainty analyses used and their application to the resource selection process. A number of opportunities exist for utilities and their regulators to improve the planning process in order to increase the value of the resource plans that are produced. Specifically, utilities and/or their state regulatory agencies can: (1) conduct comprehensive assessments of demand-side management (DSM) resources, avoid unduly restrictive screening methods, and expand data collection efforts concerning current energy-use patterns and existing DSM program performance; (2) increase the involvement of regulators and other interested non-utility parties in the resource planning process through mechanisms such as public meeting and the establishment of technical advisory boards; (3) when evaluating the cost-effectiveness of potential demand-side resources, use the Total Resource Cost Test or Societal Test instead of the more restrictive Ratepayer Impact Test, consider the environmental effects of the resources considered, and examine the effects of the entire mix of resource selection criteria used; and (4) focus uncertainty analysis on key uncertainties over the short-term time horizon and make sure that the results of this analysis are used in resource selection. 20 refs., 1 fig.

  9. Material Stabilization Project Management Plan

    SciTech Connect (OSTI)

    SPEER, D.R.

    1999-09-01T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

  10. Underground storage tank management plan

    SciTech Connect (OSTI)

    NONE

    1994-09-01T23:59:59.000Z

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  11. The Waste Management Quality Assurance Implementing Management Plan (QAIMP)

    E-Print Network [OSTI]

    Albert editor, R.

    2009-01-01T23:59:59.000Z

    DIVISION Waste Management Quality Assurance ImplementingI I IMPLEMENTING MANAGEMENT QUALITY PLAN ASSURANCE I lilillI WM-QAIMP Waste Management Quality Assurance Implementing

  12. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-29T23:59:59.000Z

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

  13. Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30T23:59:59.000Z

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

  14. UNIVERSITY OF TECHNOLOGY, SYDNEY PRIVACY MANAGEMENT PLAN

    E-Print Network [OSTI]

    University of Technology, Sydney

    1 UNIVERSITY OF TECHNOLOGY, SYDNEY PRIVACY MANAGEMENT PLAN Title: A Management Plan to comply a Privacy Management Plan in operation by the effective date. A Plan is a statement of how the agency storage (such as paper files) but also electronic records, video recordings, biometric information

  15. State Lands Management Plan Rosemary Hill Observatory

    E-Print Network [OSTI]

    Slatton, Clint

    resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

  16. Demil planning and management system

    SciTech Connect (OSTI)

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C. [Argonne National Lab., IL (United States); Golden, R.E. [Army Pacific, Fort Shafter, HI (United States); Fuller, R. [Army Industrial Operations Command, Rock Island, IL (United States). National Maintenance Point Branch

    1997-08-01T23:59:59.000Z

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  17. PRC Contract Management Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPO Website Directory PPPO Website DirectoryBOE88952

  18. PROJECT MANAGEMENT PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPO Website Directory PPPO WebsitePREP |Dan5,

  19. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign: Potential ApplicationYu,Energy Innovation

  20. Carbon Management Plan 1. Executive summary 5

    E-Print Network [OSTI]

    Haase, Markus

    Carbon Management Plan June 2011 #12;2 #12;3 CONTENTS 1. Executive summary 5 2. Introduction 15 3. Background and context 16 4. Carbon management strategy 18 5. Carbon emissions baseline and projections 22 6. Past actions and achievements 30 7. Carbon Management Plan implementation 33 8. Carbon Management Plan

  1. A reservoir management plan

    SciTech Connect (OSTI)

    Allis, R.G.

    1989-06-16T23:59:59.000Z

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  2. Energy Emergency Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-07-08T23:59:59.000Z

    To establish the administrative and operational framework of the Energy Emergency Management System (EEMS), and to establish the general criteria for the development and coordination of the Department's energy emergency planning activities. Cancels DOE 5500.8. Canceled by DOE O 151.1 of 9-25-95.

  3. Human Resources, Safety & Risk Management

    E-Print Network [OSTI]

    1 Human Resources, Safety & Risk Management 1600 Holloway Avenue, ADM 252 San Francisco, California OF RISK AND AGREEMENT TO PAY CLAIMS Activity: San Francisco State University Campus Recreation Department participating in this Activity. I am aware of the risks associated with traveling to/from and participating

  4. Contract Management Plan Outline

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1.SpaceFluor FederalEnergy Contract Awarded toTABLE OF

  5. National conference on integrated resource planning: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  6. National conference on integrated resource planning: Proceedings

    SciTech Connect (OSTI)

    Not Available

    1991-12-31T23:59:59.000Z

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

  7. Energy Efficiency in Western Utility Resource Plans Implications...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments...

  8. Optimization Online - Operations Risk Management by Planning ...

    E-Print Network [OSTI]

    Emmanuel Fragnire

    2007-08-01T23:59:59.000Z

    Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragnire(Emmanuel.Fragniere ***at***...

  9. Configuration Management Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    & Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration...

  10. Solid Waste Management Plan. Revision 4

    SciTech Connect (OSTI)

    NONE

    1995-04-26T23:59:59.000Z

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  11. ENTERPRISE RISK MANAGEMENT PLAN Texas Transportation Institute

    E-Print Network [OSTI]

    1 ENTERPRISE RISK MANAGEMENT PLAN Texas Transportation Institute The Texas A&M University System and a member of The Texas A&M University System. This document sets forth TTI's risk management plan and our strategy for enterprise risk management. This plan is intended to complement and expand upon the Institute

  12. Los Alamos National Laboratory compliance with cultural resource management legislation

    SciTech Connect (OSTI)

    Olinger, C.E.; Rea, K.H.

    1984-01-01T23:59:59.000Z

    Cultural resources management is one aspect of NEPA-induced legislation increasingly affecting federal land managers. A number of regulations, some of them recent, outline management criteria for protecting cultural resources on federal land. Nearly all construction projects at the 11,135 hectare Los Alamos National Laboratory in northern New Mexico are affected by cultural resource management requirements. A substantial prehistoric Puebloan population occupied the Laboratory area from the 13th to the early 16th centuries. Grazing, timbering, and homesteading followed Indian occupation. Therefore, archaeological and historical ruins and artifacts are abundant. The Laboratory has developed a cultural resources management program which meets both legal and project planning requirements. The program operates in coordination with the New Mexico State Historical Preservation Office. Major elements of the Laboratory program are illustrated by a current project involving relocation of a homesteader's cabin located on land required for a major new facility. The Laboratory cultural resource management program couples routine oversight of all engineering design projects with onsite resource surveys and necessary mitigation prior to construction. The Laboratory has successfully protected major archaeological and historical ruins, although some problems remain. The cultural resource program is intended to be adjustable to new needs. A cultural resource management plan will provide long-term management guidance.

  13. University of Aberdeen Carbon Management Plan

    E-Print Network [OSTI]

    Levi, Ran

    of Aberdeen is committed to reducing its carbon footprint and to playing its part in limiting the worstUniversity of Aberdeen Carbon Management Plan Higher Education Carbon Management Programme working with Page 1 The University of Aberdeen Carbon Management Programme Carbon Management Plan (CMP

  14. ICDF Complex Operations Waste Management Plan

    SciTech Connect (OSTI)

    W.M. Heileson

    2006-12-01T23:59:59.000Z

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  15. Materials Sciences Division Integrated Safety Management Plan

    E-Print Network [OSTI]

    Materials Sciences Division Integrated Safety Management Plan Revised: February 9, 2012 Prepared by: signed Feb. 9, 2012 Rick Kelly, Facility/EH&S Manager Submitted by: signed Feb. 9, 2012 Miquel Salmeron.1 RESPONSIBILITY AND AUTHORITY THROUGH LINE MANAGEMENT............................................................5

  16. School Of Resource and Environmental Management

    E-Print Network [OSTI]

    conservation, sustainable resource management, and environmental monitoring. Students will learn aboutSchool Of Resource and Environmental Management SIMON FRASER UNIVERSITY Sessional Instructor the implications of uncertainty in the interpretation of ecological data and environmental decision making

  17. Effects of Brush Management on Water Resources

    E-Print Network [OSTI]

    Jones, C. Allan; Gregory, Lucas

    TR-338 2008 Effects of Brush Management on Water Resources By: C. Allan Jones and Lucas Gregory, Texas Water Resources Institute, Texas A&M AgriLife Texas Water Resources Institute Technical Report... November 2008 Effects of Brush Management on Water Resources By Allan Jones and Lucas Gregory Texas Water Resources Institute Texas A&M AgriLife November 2008 TR-338 2008 1 Summary ? For several decades, land managers have cleared brush...

  18. Hanford site ground water protection management plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities.

  19. NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop

    SciTech Connect (OSTI)

    Renne, D.

    2008-10-29T23:59:59.000Z

    Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

  20. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1992-12-01T23:59:59.000Z

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  1. Oak Ridge Reservation Waste Management Plan

    SciTech Connect (OSTI)

    Turner, J.W. [ed.

    1995-02-01T23:59:59.000Z

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  2. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  3. WATER RESOURCES PLANNING ACT Q:\\COMP\\WATER1\\WRPA

    E-Print Network [OSTI]

    US Army Corps of Engineers

    103 WATER RESOURCES PLANNING ACT Q:\\COMP\\WATER1\\WRPA December 29, 2000 #12;Q:\\COMP\\WATER1\\WRPA December 29, 2000 #12;105 WATER RESOURCES PLANNING ACT [As Amended Through P.L. 106580, Dec. 29, 2000 planning of water and related land resources, through the establishment of a water resources council

  4. A good integrated resource plan: Guidelines for electric utilities and regulators

    SciTech Connect (OSTI)

    Hirst, E.

    1992-12-01T23:59:59.000Z

    Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively. Key characteristics of this planning approach include: explicit consideration and fair treatment of a wide variety of demand and supply options, consideration of the environmental and other social costs of providing energy services, public participation in the development of the resource plan, and analysis of the uncertainties associated with different external factors and resource options. Integrated resource planning differs from traditional planning in the types and scope of resources considered, the owners of the resources, the organizations involved in resource planning, and the criteria for resource selection. This report presents suggestions to utilities on how to conduct such planning and what to include in their resource-planning reports. These suggestions are based on a review of about 50 resource plans as well as discussions with and presentations to regulators and utilities. The suggestions cover four broad topics; the technical competence with which the plan was developed; the adequacy, detail, and consistency (with the long-term plan) of the short-term action plan; the extent to which the interests of various stakeholders was considered, both in public participation in plan development and in the variety of resource plans developedand assessed; and the clarity and comprehensiveness of the utility's report on its plan. Technical competence includes energy and demand forecasts, assessment of supply and demand resources, resource integration, and treatment of uncertainty. Issues associated with forecasts include forecasting approaches; links between the forecasts of energy use and peak demands; and links between the forecasts and the effects of past, present, and future demand-side management programs.

  5. A good integrated resource plan: Guidelines for electric utilities and regulators

    SciTech Connect (OSTI)

    Hirst, E.

    1992-12-01T23:59:59.000Z

    Integrated resource planning helps utilities and state regulatory commissions consistently assess a broad range of demand and supply resources to meet customer energy-service needs cost-effectively. Key characteristics of this planning approach include: explicit consideration and fair treatment of a wide variety of demand and supply options, consideration of the environmental and other social costs of providing energy services, public participation in the development of the resource plan, and analysis of the uncertainties associated with different external factors and resource options. Integrated resource planning differs from traditional planning in the types and scope of resources considered, the owners of the resources, the organizations involved in resource planning, and the criteria for resource selection. This report presents suggestions to utilities on how to conduct such planning and what to include in their resource-planning reports. These suggestions are based on a review of about 50 resource plans as well as discussions with and presentations to regulators and utilities. The suggestions cover four broad topics; the technical competence with which the plan was developed; the adequacy, detail, and consistency (with the long-term plan) of the short-term action plan; the extent to which the interests of various stakeholders was considered, both in public participation in plan development and in the variety of resource plans developedand assessed; and the clarity and comprehensiveness of the utility`s report on its plan. Technical competence includes energy and demand forecasts, assessment of supply and demand resources, resource integration, and treatment of uncertainty. Issues associated with forecasts include forecasting approaches; links between the forecasts of energy use and peak demands; and links between the forecasts and the effects of past, present, and future demand-side management programs.

  6. Vice President, Planning and Asset Management

    Broader source: Energy.gov [DOE]

    THIS VACANCY ANNOUNCEMENT HAS BEEN MODIFIED TO EXTEND THE CLOSING DATE TO 7/10/2015. Planning and Asset Management is responsible for overseeing Bonneville Power Administration's transmission...

  7. Storm Water Management Plan Program (Nebraska)

    Broader source: Energy.gov [DOE]

    This legislation implements the National Pollutant Discharge Elimination System Requirements, and encourages cities and counties to create stormwater management plans in order to receive grant...

  8. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other NewsSpin andInterim Data Changes Performance Management

  9. 2011-2015 Human Capital Management Plan

    Broader source: Energy.gov [DOE]

    The Office of Legacy Management (LM) needs skilled and engaged staff to accomplish our mission and carry out our responsibilities to the American people. This Human Capital Management Plan (HCMP or...

  10. Managing renewable resources via Collective Intelligence

    E-Print Network [OSTI]

    Boschetti, Fabio

    Managing renewable resources via Collective Intelligence Brede, M., F. Boschetti, and D. Mc.Brede,Fabio.Boschetti,David.Mcdonald]@csiro.au Keywords: ABM, Game Theory, Resource Exploitation, Optimisation. EXTENDED ABSTRACT In a recent set of work, 2001; Wolpert et al, 2004) into resource management modelling. These tools were designed to minimise

  11. FY 1991--FY 1995 Information Technology Resources Long-Range Plan

    SciTech Connect (OSTI)

    Not Available

    1989-12-01T23:59:59.000Z

    The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

  12. Community Energy Planning A Resource Guide for Remote Communities...

    Open Energy Info (EERE)

    Canada Jump to: navigation, search Name Community Energy Planning A Resource Guide for Remote Communities in Canada AgencyCompany Organization Natural Resources Canada Sector...

  13. Operational efficiency through resource planning optimization and work process improvement

    E-Print Network [OSTI]

    Balwani, Siddharth (Siddharth Vashdev)

    2012-01-01T23:59:59.000Z

    This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

  14. Risk Management Department of Human Resource Services

    E-Print Network [OSTI]

    de Lijser, Peter

    Risk Management Department of Human Resource Services Workers' Compensation Update INJURY to identify and address potential safety hazards. It also assists Risk Management staff determine in a timely manager or supervisor will contact Risk Management to arrange transportation. An employee who needs

  15. Risk Management Department of Human Resource Services

    E-Print Network [OSTI]

    de Lijser, Peter

    Risk Management Department of Human Resource Services Workers' Compensation Update RETURN TO WORK or supervisor upon returning to work. The manager or supervisor should fax a copy of the release to Risk, the University's Workers' Compensation Program Manager, at extension 2824 or visit the Risk Management Website

  16. Draft Management Plan Upper Snake Province

    E-Print Network [OSTI]

    .......................................................................................4-5 Consistency with Idaho's Water Quality Management Plan...........................4-5 303(dDraft Management Plan Upper Snake Province Submitted To The Northwest Power and Conservation Quality Anti-Degradation Policy (39-3603) ............................................4-8 ESA and CWA

  17. Social Impact Management Plans: Innovation in corporate and public policy

    SciTech Connect (OSTI)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15T23:59:59.000Z

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes assessment, management and monitoring to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: Social impact management plans are effective strategies to manage social issues. They are developed in partnership with regulatory agencies, investors and community. SIMPs link assessment to ongoing management and address social and community issues. SIMPs clarify responsibilities in the management of impacts, opportunities and risks. SIMPs demonstrate a shift to include management as a core component of SIA practice.

  18. Integrated system dynamics toolbox for water resources planning.

    SciTech Connect (OSTI)

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David (University of New Mexico, Albuquerque, NM); Chemak, Janie (University of New Mexico, Albuquerque, NM); Cockerill, Kristan (Cockeril Consulting, Boone, NC); Aragon, Carlos (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Roach, Jesse

    2006-12-01T23:59:59.000Z

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.

  19. Managing talent flow. 2006 Energy and Resources

    E-Print Network [OSTI]

    and market growth in mining, utilities, oil and gas have been relatively stagnant, prompting many youngManaging talent flow. 2006 Energy and Resources Talent Pulse Survey Report Consulting #12;Executive ................................................................ 13 Contents #12;1 Managing talent flow 2006 Energy and Resources Talent Pulse Survey Report 2006

  20. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect (OSTI)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20T23:59:59.000Z

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  1. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  2. Idaho National Laboratory Cultural Resource Management Annual Report FY 2006

    SciTech Connect (OSTI)

    Clayton F. Marler; Julie Braun; Hollie Gilbert; Dino Lowrey; Brenda Ringe Pace

    2007-04-01T23:59:59.000Z

    The Idaho National Laboratory Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500-year span of human occupation in the region. As a federal agency, the Department of Energy Idaho Operations Office has legal responsibility for the management and protection of those resources and has delegated these responsibilities to its primary contractor, Battelle Energy Alliance (BEA). The INL Cultural Resource Management Office, staffed by BEA professionals, is committed to maintaining a cultural resource management program that accepts these challenges in a manner reflecting the resources importance in local, regional, and national history. This annual report summarizes activities performed by the INL Cultural Resource Management Office staff during Fiscal Year 2006. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be both informative to internal and external stakeholders, and to serve as a planning tool for future cultural resource management work to be conducted on the INL.

  3. Risk Management Department of Human Resource Services

    E-Print Network [OSTI]

    de Lijser, Peter

    Risk Management Department of Human Resource Services Workers' Compensation Update WORKERS and are available by contacting the Risk Management department. Please do not add this form to any packets kept' COMPENSATION PHARMACY BENEFIT MANAGEMENT PROGRAM The California State University system has partnered

  4. HUMAN RESOURCES WORKING GROUP: ACTION PLAN VISION PRIORITY: MAXIMIZING OUR HUMAN RESOURCES

    E-Print Network [OSTI]

    Sheridan, Jennifer

    HUMAN RESOURCES WORKING GROUP: ACTION PLAN VISION PRIORITY: MAXIMIZING OUR HUMAN RESOURCES, and student body." From David Ward, "A Vision for the Future," p. 9. This document lists the human-resource goals and plans of the Office of Human Resources, the Equity and Diversity Resource Center

  5. CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan

    E-Print Network [OSTI]

    CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan 5.1 Vision The Willamette Subbasin Plan Oversight drafted the following vision: Willamette Basin citizens from all walks of life prize and enjoy a quilt-work of natural areas, working landscapes, and distinctive communities, from the crest of the Coast Range

  6. Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that

    E-Print Network [OSTI]

    Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that describes (1) the investigator's commitment to the funder's Data Policy and (2) how the investigator plans to manage the data

  7. Integrated Safety Management System as the Basis for Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development Integrated Safety Management System as the Basis for Work Planning and...

  8. MIDDLE SNAKE SUBBASINS MANAGEMENT PLAN SUPPLEMENT PRIORITIZED IMPLEMENTATION

    E-Print Network [OSTI]

    MIDDLE SNAKE SUBBASINS MANAGEMENT PLAN SUPPLEMENT ­ PRIORITIZED IMPLEMENTATION NOVEMBER 24, 2004/Browsing..........................................................................................9 Key Limiting Factor #5: Water Quality............................................................................................................................11 Management Plan Considerations

  9. System integration test plan for HANDI 2000 business management system

    SciTech Connect (OSTI)

    Wilson, D.

    1998-08-24T23:59:59.000Z

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  10. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    Green,T.

    2009-10-23T23:59:59.000Z

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

  11. Combining Representations from Manufacturing, Machine Planning, and Manufacturing Resource Planning (MRP)

    E-Print Network [OSTI]

    Cook, Diane J.

    -time controller. The controller uses four matrices: Fv and Sv describe ordering constraints between plan by allowing limited production capacity Inputs to Control System Researchers studying issues in intelligentCombining Representations from Manufacturing, Machine Planning, and Manufacturing Resource Planning

  12. Energy resource management for energy-intensive manufacturing industries

    SciTech Connect (OSTI)

    Brenner, C.W.; Levangie, J.

    1981-10-01T23:59:59.000Z

    A program to introduce energy resource management into an energy-intensive manufacturing industry is presented. The food industry (SIC No. 20) was chosen and 20 companies were selected for interviews, but thirteen were actually visited. The methodology for this program is detailed. Reasons for choosing the food industry are described. The substance of the information gained and the principal conclusions drawn from the interviews are given. Results of the model Energy Resource Management Plan applied to three companies are compiled at length. Strategies for dissemination of the information gained are described. (MCW)

  13. Integrating Knowledge Management and Human Resources via Skill Management

    E-Print Network [OSTI]

    Appelrath, Hans-Jrgen

    Integrating Knowledge Management and Human Resources via Skill Management Norbert Gronau. The human resources department can look for certain skills and compare the skills of an employee [Kreitmeier et al. 2000]. The company is able to save costs that otherwise apply to placing adverts for job

  14. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect (OSTI)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01T23:59:59.000Z

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  15. HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program

    E-Print Network [OSTI]

    HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency-Arriving Summer/Fall Chinook 97 Table B.5 Tribal Incidental Take Thresholds for ESA-Listed 98 Upper Columbia River

  16. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26T23:59:59.000Z

    Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

  17. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26T23:59:59.000Z

    The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

  18. Imnaha Subbasin Management Plan Subbasin Lead Entity

    E-Print Network [OSTI]

    Imnaha Subbasin Management Plan May 2004 Written by Ecovista Subbasin Lead Entity: Nez Perce Tribe....................................................................................... 6 1.2.4 Ecovista Website Information.......................................................................... 59 4.3 Terrestrial Data and Information Gaps

  19. MSU Departmental Assessment Plan Department: Land Resources and Environmental Sciences

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2007-2009 Department: Land Resources and Environmental Sciences (cross-college) #12;Student Outcomes Assessment Plan Land Resources and Environmental Sciences Department The Department of Land Resources and Environmental Sciences (LRES) will undertake a continuing assessment

  20. Warner College of Natural Resources 2005-2010 Strategic Plan

    E-Print Network [OSTI]

    of renewable and non-renewable resources. #12;SOCIETAL GOALS Human dimensions (human understandingWarner College of Natural Resources 2005-2010 Strategic Plan Executive Summary #12;WARNER COLLEGE OF NATURAL RESOURCES 2005-2010 STRATEGIC PLAN Executive Summary Our Vision To be the global leader

  1. Strategic Planning System for Exotic Game Management

    E-Print Network [OSTI]

    Lubbering, Jeanne Marie Petrofes

    1988-01-01T23:59:59.000Z

    STRATEGIC PLANNING SYSTEM FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Submitted to the Office of Graduate Studies of Texas ASM University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE December 1988 Major Subject: Range Science STRATEGIC PLANNING FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Approved as to style and content by: J ry W. uth (Ch ir of Committee) Steve Archer (Member) Duane C...

  2. aid resource planning: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Planning Problems of Urban Water Resources in the Metropolitan Area of Greater San Antonio Texas A&M University - TxSpace Summary: including the inventory and planning...

  3. Department of Energy Management of Cultural Resources

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-02T23:59:59.000Z

    The purpose of this Policy is to ensure that Department of Energy (DOE) programs, including the National Nuclear Security Administration (NNSA), and field elements integrate cultural resources management into their missions and activities. Certified 1-28-11. No cancellation.

  4. Puget Sound Energy- Resource Conservation Manager Program

    Broader source: Energy.gov [DOE]

    Puget Sound Energy's (PSE) Resource Conservation Manager Program (RCM) provides funding and support to customers who hire a RCM. The role of an RCM is to increase efficiency by focusing on...

  5. Resource Management and Containment for Active Services

    E-Print Network [OSTI]

    Mills Advanced Networking Technologies Division National Inst. Of Standards and Technology Gaithersburg of activity in standards groups (IETF, JAVA community). Same resource problems as traditional Active Nets APIs JAIN Service APIs Session Initiation Protocol (SIP) Event / Service Manager Interface Soft

  6. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect (OSTI)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01T23:59:59.000Z

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

  7. Idaho National Laboratory Cultural Resource Management Annual Report FY 2007

    SciTech Connect (OSTI)

    Julie Braun; Hollie Gilbert; Dino Lowrey; Clayton Marler; Brenda Pace

    2008-03-01T23:59:59.000Z

    The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500-year span of human land use in the region. As a federal agency, the Department of Energy Idaho Operations Office has legal responsibility for the management and protection of those resources and has delegated these responsibilities to its primary contractor, Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts these challenges in a manner reflecting the resources importance in local, regional, and national history. This annual report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2007. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be both informative to internal and external stakeholders, and to serve as a planning tool for future cultural resource management work to be conducted on the INL.

  8. John Angelis named Manager, Information Resource Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron beam chargesJenniferJohann Deisenhofer,ANames John

  9. Utilities Department Resource Management Division

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTri Global Energy LLCEnergy)PeteforsythUtah/Wind Resources/FullDepartment

  10. Rangeland Resource Management for Texans: Why are Goals Important for Natural Resource Management?

    E-Print Network [OSTI]

    White, Larry D.; Fox, William E.

    2002-04-29T23:59:59.000Z

    This publication discusses the need for rangeland resource managers to set goals and then to take the correct actions to achieve those goals....

  11. UNC CHARLOTTE EXPORT MANAGEMENT PLAN JULY 25, 2012 Page 1 of 21 Export Management Plan

    E-Print Network [OSTI]

    Howitt, Ivan

    UNC CHARLOTTE EXPORT MANAGEMENT PLAN JULY 25, 2012 Page 1 of 21 Export Management Plan I. Export laws and regulations are the bases for restricting use and access to this information. In particular, a "deemed export" (one requiring a license and imposing access restrictions) exists whenever

  12. 6 Management Plan 6.1.1 Introduction

    E-Print Network [OSTI]

    management). The management plan is made up of six components: 1) the vision for the subbasin; 2) the working management is used to respond to the outcomes of these "tests" of "working hypotheses." Hypotheses192 6 Management Plan 6.1.1 Introduction Emphasis in this management plan is placed on selected

  13. Assessing the Situation at El Pilar: Chronology, Survey, Conservation, and Management Planning for the 21st Century

    E-Print Network [OSTI]

    Ford, Anabel; Wernecke, Clark

    2000-01-01T23:59:59.000Z

    plan, critical to resource management, and imperative to archaeological study of the urban qualities of ancient El Pilar, the complete survey

  14. FORMALDEHYDE Formaldehyde Management Plan i

    E-Print Network [OSTI]

    Rubloff, Gary W.

    )5-3960 (Industrial Hygiene, Biological Safety, Occupational Safety, Hazardous Waste Management, Fire Protection Prepared by: Industrial Hygienist Date Reviewed and Approved by: Chair- UM EH&S Operations Committee Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 PERSONAL HYGIENE PRACTICES

  15. ENVIRONMENTAL STUDIES PROGRAM RENEWABLE RESOURCES & ENERGY POLICY & MANAGEMENT SPECIALIST

    E-Print Network [OSTI]

    Martin, Jeff

    ENVIRONMENTAL STUDIES PROGRAM RENEWABLE RESOURCES & ENERGY POLICY & MANAGEMENT SPECIALIST to research and teaching in areas of renewable energy, resource management and environmental policy

  16. Community-Based Forest (Natural) Resource Management: A Path...

    Open Energy Info (EERE)

    Based Forest (Natural) Resource Management: A Path to Sustainable Environment and Development Jump to: navigation, search Name Community-Based Forest (Natural) Resource Management:...

  17. Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla

    E-Print Network [OSTI]

    Browne, James C.

    Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla University of Texas describes a taxonomy for classifying resource management architectures and presents the survey of resource of grid resource management systems; section 4 presents the survey of resource management in popular grid

  18. MSU Departmental Assessment Plan Department: Land Resources and Environmental Sciences

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    MSU Departmental Assessment Plan 2009-2010 Department: Land Resources and Environmental Sciences: Ecology and Environmental Sciences (cross-college) #12;Student Outcomes Assessment Plan Land Resources Department Head: Tracy M. Sterling Assessment Coordinator: Cathy Zabinski Degrees/Majors/Options Offered

  19. BUSINESS CONTINUITY PLANNING RESOURCES FOR SMALL-AND MEDIUM-

    E-Print Network [OSTI]

    BUSINESS CONTINUITY PLANNING RESOURCES FOR SMALL- AND MEDIUM- SIZED BUSINESSES May 2010 Prepared and supported by the Northwest Regional Technology Center for Homeland Security Business Continuity Planning Resources for Small- and Medium- Sized Businesses KS Judd AM Lesperance May 14, 2010 #12;DISCLAIMER

  20. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  1. Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)

    SciTech Connect (OSTI)

    Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

    2014-01-01T23:59:59.000Z

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  2. PFP Interface identification and management planning guide

    SciTech Connect (OSTI)

    SINCLAIR, J.C.

    1999-05-20T23:59:59.000Z

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required.

  3. INEEL Cultural Resource Management Program Annual Report - 2004

    SciTech Connect (OSTI)

    Clayton F. Marler

    2005-01-01T23:59:59.000Z

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.

  4. The role of strategic planning in emergency management

    SciTech Connect (OSTI)

    Douglas, N.B. [National Communications System, Arlington, VA (United States); Harrison, G.T. [Booz, Allen and Hamilton, Inc., McLean, VA (United States)

    1995-12-31T23:59:59.000Z

    Rapid technology development, competition for resources, and an increasing awareness of the global community are but a few of the many forces and trends affecting today`s Emergency Management Organizations. Implementing a continuous Strategic Planning process helps an Emergency Management Organization to formulate responses to issues such as those stated above. By continuously monitoring the forces and trends in its environment, the organization is able to succinctly identify its strategic issues and subsequently frame an appropriate infrastructure of goals, objectives, and strategies. Strategic Planning also holds significant potential for the emergency management community at large. The wide range of expertise and the inherent dependencies between Emergency Management Organizations at all levels of government -- including the local, national, and international arenas -- makes the emergency management community an ideal candidate to capitalize on the benefits resulting from joint strategic planning. The identification of common issues, priorities, and requirements provides the foundation for increased resource and information sharing, as well as the formulation of strategic partnerships between organizations to battle common threats.

  5. CRAD, Configuration Management Assessment Plan

    Broader source: Energy.gov [DOE]

    The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

  6. Annex 3 Resource Management Review The following questions will be addressed by the Resource Management Review

    E-Print Network [OSTI]

    Management Review: Work Breakdown Structure Is there a valid work breakdown structure? Does it coverAnnex 3 ­ Resource Management Review The following questions will be addressed by the Resource the complete project? Are there work package (WP) descriptions? Are these detailed enough? Do they have WP

  7. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2010-02-01T23:59:59.000Z

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  8. Water resources planning under climate change and variability

    E-Print Network [OSTI]

    O'Hara, Jeffrey Keith

    2007-01-01T23:59:59.000Z

    Scenario to Climatic Changes. Water Resources Management 19:2006) Quantifying the Urban Water Supply Impacts of Climateto the Shape of Supply? Water Demand Under Heterogeneous

  9. Utility Integrated Resource Planning: An Emerging Driver of New Renewable Generation in the Western United States

    E-Print Network [OSTI]

    Bolinger, Mark; Wiser, Ryan

    2005-01-01T23:59:59.000Z

    towards that portfolio. Renewable resources were once rarelyobjectively evaluate renewable resources. Planned Renewableamount of planned renewable resource additions. In the case

  10. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    E-Print Network [OSTI]

    Wiser, Ryan; Bolinger, Mark

    2005-01-01T23:59:59.000Z

    Planning with Renewable Resources. The Electricityindirect costs of renewable resources, as well as resourceamount of planned renewable resource additions. In the case

  11. State Lands Management Plan Randell Mound at Pineland

    E-Print Network [OSTI]

    Slatton, Clint

    resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

  12. State Lands Management Plan Clark Island at Cedar Key

    E-Print Network [OSTI]

    Slatton, Clint

    resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

  13. Project Hanford management contract quality improvement project management plan

    SciTech Connect (OSTI)

    ADAMS, D.E.

    1999-03-25T23:59:59.000Z

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  14. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    E-Print Network [OSTI]

    Bolinger, Mark; Wiser, Ryan

    2005-01-01T23:59:59.000Z

    Planning with Renewable Resources. The Electricity14 4.1 Renewable Resources20 5. Renewable Resource Cost and Performance

  15. Individual Development and Excutive Development Plan Resources

    Broader source: Energy.gov [DOE]

    According to OPM, an individual development plan (IDP) is a tool to assist employees in career and personal development. Its primary purpose is to help employees reach short and long-term career...

  16. Data Management Plan Types of Data

    E-Print Network [OSTI]

    Tam, Tin-Yau

    Data Management Plan Types of Data The research described herein will lead to the discovery of new will be followed by electrochemistry, Raman spectroscopy and optical spectroscopy. All data will be stored electronically in word processing documents. Data Standards All data will be stored in an electronic format

  17. Hanford emergency management plan - release 15

    SciTech Connect (OSTI)

    CARPENTER, G.A.

    1999-07-19T23:59:59.000Z

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  18. Office of Facilities Planning and Management

    E-Print Network [OSTI]

    Ford, James

    approved areas) Carbon Fooprint Reminders Less Energy Less Paper Less Water Timer installation (Department #12;Office of Facilities Planning and Management Carbon Footprint Reminders to ourselves Reminders & Ziplock (rinsed) Bubble Wrap NO Paper with food Paper cups (coffee, soda) Napkins Chip bags #12;Office

  19. Management and Performance PERFORMANCE REPORTING AND PLANNING

    E-Print Network [OSTI]

    Administration (FAA), the Aviation Safety #12;Management and Performance PERFORMANCE REPORTING AND PLANNING M on real flight datasets of at least 10 terabytes. NASA provided the capabilities to the Federal Aviation necessary to design radically new aviation systems, and enabling efficient, high-confidence design

  20. Annual Report Environmental Management Planning Committee

    E-Print Network [OSTI]

    ..........................................................................................................3 ENVIRONMENTAL MANAGEMENT PLAN (EMP) .....................................................4 ENERGY transport, this project will reduce greenhouse gas emissions and increase efficiency, and is the largest corporate bike fleet in Australia The ANU Ride2Uni program now has 450 members, up from 270 in 2004

  1. HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program

    E-Print Network [OSTI]

    HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency Take Thresholds for ESA-Listed 44 Upper Columbia River Steelhead Table 4. Tribal & Recreational Incidental Take Thresholds 45 for Unmarked Spring Chinook Table 5. Estimated Carrying Capacity of Natural

  2. 2004 Power Marketing Plan - Base Resource Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Terminates the existing contract amendments that provide for a customer's right to purchase power from Western after 2004. Execution of the Base Resource contract sustains a...

  3. Project management plan for Contract Management Information System (CONTRACT)

    SciTech Connect (OSTI)

    Severud, K.J.

    1995-01-27T23:59:59.000Z

    The office of the Vice President of A/E Construction for ICF Kaiser has requested that OSHA compliance statistics be made available to management for companies subcontracting to the ICF Kaiser Company. In addition, a need to better manage contract administrative data for the Contracts Administration and the Construction Management Projects organizations has been identified. The Contract Management Information System is being developed to achieve these objectives. This document provides a Project Management Plan for development of the Contract Management Administration System (CONTRACT) by Design Services DAD/CAE Support. The Project Management Plan describes the project work breakdown structure, safety and quality considerations, with associated cost, schedule and project management information. The CONTRACT System is intended to aid the ICF Kaiser divisions with tracking of A/E subcontractor information to include general contract administration information used by the Contracts Administration organization, contract and safety performance data used by the Construction Management Projects and office of the organization and Vice President of A/E Construction.

  4. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn Other NewsSpin andInterim Data Changes

  5. Site Management Plan Page 1

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthN V O'1 ~(3JlpV Project Proposal

  6. Tank Waste Remediation Systems (TWRS) Configuration Management Implementation Plan

    SciTech Connect (OSTI)

    WEIR, W.R.

    2000-12-18T23:59:59.000Z

    The Tank Waste Configuration Management (TWRS) Configuration Management Implementation Plan descibes the execution of the configuration management (CM) that the contractor uses to manage and integrate its programmatic and functional operations to perform work.

  7. Assessing integrated resource plans prepared by electric utilities

    SciTech Connect (OSTI)

    Hirst, E.; Schweitzer, M. (Oak Ridge National Lab., TN (USA)); Yourstone, E. (Yourstone (Evelin), Albuquerque, NM (USA)); Eto, J. (Lawrence Berkeley Lab., CA (USA))

    1990-02-01T23:59:59.000Z

    This report discusses guidelines for long-term resource plans, based on the written reports only. The word plan refers to both the program worked out beforehand to accomplish a goal and the report that describes the plan. The particular meaning should be clear from the context. The purpose of these guidelines is to assist PUC staff who review utility plans and utility staff who prepare such plans. These guidelines were developed at Oak Ridge National Laboratory with contributions from Lawrence Berkeley Laboratory. 45 refs.

  8. Quality of Service Resource Management Michael J. Katchabaw

    E-Print Network [OSTI]

    Katchabaw, Michael James

    into a working prototype management system. With this prototype system, extensive quality of service management management. iii #12; Keywords: Quality of service management, resource management, distributed systemsQuality of Service Resource Management by Michael J. Katchabaw Graduate Program in Computer Science

  9. Wildlife Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Giffen, Neil R [ORNL; Evans, James W. [TWRA; Parr, Patricia Dreyer [ORNL

    2007-10-01T23:59:59.000Z

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  10. Seventh Power Plan: Generating Resources Advisory

    E-Print Network [OSTI]

    's Seventh Power Plan. Included feedback and ideas from regional entities Council Members prioritized list of topics Council Members prioritized list of topics and identified four to focus on early in the process 2; strategies to help meet those needs Customer demand response, including its potential as a source of peaking

  11. Criteria for an effective water resource planning process

    E-Print Network [OSTI]

    Bowers, James Myron

    1961-01-01T23:59:59.000Z

    In examining the present status of water resource planning in the Pacific Northwest, numerous critical inadequacies become readily apparent. One method of minimizing some of these inadequacies is through administrative ...

  12. 2011 Annual Planning Summary for Office of Legacy Management...

    Office of Environmental Management (EM)

    Summary for Legacy Management (LM) 2013 Annual Planning Summary for the Office of Legacy Management 2012 Independent Communication and Outreach Stakeholder Satisfaction Survey...

  13. Resource-Optimal Planning For An Autonomous Planetary Vehicle

    E-Print Network [OSTI]

    Della Penna, Giuseppe; Magazzeni, Daniele; Mercorio, Fabio; 10.5121/ijaia.2010.1302

    2010-01-01T23:59:59.000Z

    Autonomous planetary vehicles, also known as rovers, are small autonomous vehicles equipped with a variety of sensors used to perform exploration and experiments on a planet's surface. Rovers work in a partially unknown environment, with narrow energy/time/movement constraints and, typically, small computational resources that limit the complexity of on-line planning and scheduling, thus they represent a great challenge in the field of autonomous vehicles. Indeed, formal models for such vehicles usually involve hybrid systems with nonlinear dynamics, which are difficult to handle by most of the current planning algorithms and tools. Therefore, when offline planning of the vehicle activities is required, for example for rovers that operate without a continuous Earth supervision, such planning is often performed on simplified models that are not completely realistic. In this paper we show how the UPMurphi model checking based planning tool can be used to generate resource-optimal plans to control the engine of ...

  14. AVLIS Production Plant Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15T23:59:59.000Z

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  15. VA Energy Management Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VA Energy Management Action Plan VA Energy Management Action Plan Presentation covers the FUPWG Meeting, held on May 1-2, 2007 in Cape Canaveral, Florida. fupwgccdemers.pdf More...

  16. Treatment of Solar Generation in Electric Utility Resource Planning

    SciTech Connect (OSTI)

    Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

    2013-10-01T23:59:59.000Z

    Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

  17. Developing an integrated resource plan and planning process at Puget Power

    SciTech Connect (OSTI)

    Hirst, E.; Knutsen, C.

    1987-01-01T23:59:59.000Z

    This paper discusses the progress that Puget Sound Power and Light Company has made in pursuing a new project, Demand and Resource Evaluation (DARE), which began in early 1986. The purposes of DARE are to strengthen the integrated planning process within Puget Power and to develop an integrated resource plan for Puget Power.

  18. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  19. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  20. NARSTO Quality Planning and Data Management Handbooks Executive Summary

    E-Print Network [OSTI]

    'existingqualityassuranceprograms. The first of the three documents, the NARSTO Quality Systems Management Plan (QSMP), is the umbrella underNARSTO Quality Planning and Data Management Handbooks Executive Summary This brief Executive, and guidance documents for quality planning and data management. NARSTO is a non-binding, tri-national public

  1. Act 38 Record Keeping Checklist Pennsylvania's Nutrient Management Plans

    E-Print Network [OSTI]

    Guiltinan, Mark

    March 2007 Act 38 Record Keeping Checklist Pennsylvania's Nutrient Management Plans The following group listed in the nutrient management plan. To fulfill Act 38 record keeping requirements a file in the nutrient management plan. In addition, the following land application information must be recorded annually

  2. SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning

    E-Print Network [OSTI]

    Squire, Larry R.

    SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help is subject to change without notice. #12;Morehead Associates Page 2 of 115 Manager's Guide to Survey Feedback;Morehead Associates Page 3 of 115 Manager's Guide to Survey Feedback and Action Planning Action Planning

  3. Template for NSF Data Management Plan In general, the data management plan should answer these two questions

    E-Print Network [OSTI]

    He, Chuan

    Template for NSF Data Management Plan In general, the data management plan should answer these two. Expected Data Describe the types of data, samples, physical collections, survey responses, interviews

  4. Cesium legacy safety project management work plan

    SciTech Connect (OSTI)

    Durham, J.S.

    1998-04-21T23:59:59.000Z

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  5. Cultural resource management: The risk of compliance

    SciTech Connect (OSTI)

    Curtis, S.A.

    1994-02-01T23:59:59.000Z

    The statutory mandate for federal agencies to involve American Indians in the management of cultural resources may create a cultural risk for the people those statutes are intended to protect. A conceptual framework is given to help understand this dilemma. Factors that can exacerbate the severity of the adverse cultural impacts for tribal people are also examined. Policy recommendations are offered for reducing tensions among an the participants in the statutory process.

  6. COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material

    E-Print Network [OSTI]

    Simaan, Nabil

    COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material resources throughout the life of a project by using modern management. Today's construction engineers and managers are faced with unprecedented challenges in planning

  7. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  8. Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management

    SciTech Connect (OSTI)

    A. David Lester

    2008-10-17T23:59:59.000Z

    The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

  9. 5 Management Plan The management plan described in this section is a culmination of extraordinary efforts by the

    E-Print Network [OSTI]

    work together to "derive" and establish the key elements of the Management Plan. Assessment290 5 Management Plan The management plan described in this section is a culmination as a laborious result of carrying out the assessment and inventory work and formation of the vision, goals

  10. Local government involvement in long term resource planning for community energy systems

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

  11. Strategic Energy Management Plan for the 1990's

    E-Print Network [OSTI]

    Fiorino, D. P.; Priest, J. W.

    1987-01-01T23:59:59.000Z

    This paper describes the strategic energy management plan implemented by the Defense Systems and Electronics Group (DSEG) of Texas Instruments (TI) to enable it to meet its energy management challenge into the 1990's. The strategic energy management...

  12. Strategic Energy Management Plan for the 1990's

    E-Print Network [OSTI]

    Fiorino, D. P.; Priest, J. W.

    1987-01-01T23:59:59.000Z

    This paper describes the strategic energy management plan implemented by the Defense Systems and Electronics Group (DSEG) of Texas Instruments (TI) to enable it to meet its energy management challenge into the 1990's. The strategic energy management...

  13. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    SciTech Connect (OSTI)

    Warner, B

    2002-04-25T23:59:59.000Z

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

  14. Paducah Site Management Plan | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM5 Accretion-of-DutiesPROPERTY3-0127 -PotentialSiteManagement

  15. The role of competitive forces in integrated resource planning

    SciTech Connect (OSTI)

    Kahn, E.; Goldman, C.

    1991-10-01T23:59:59.000Z

    In this report, we study the potential for competitive forces to enhance the efficiency of integrated resource planning and produce consumer cost reductions. We examine the efficiency gains from competition in the private power market, and ask whether similar forces can be successful on the demand-side of the market. The goal of this analysis is to identify and elucidate options available to state Public Utility Commissions (PUCs) to support competition in utility demand-side management programs to achieve efficiencies similar to those being achieved through development of competitive forces on the supply-side of the industry. We consider the entire market structure from upstream suppliers to distribution intermediaries to ultimate consumers. The market structure differs substantially between the demand-side and the supply-side of the electricity market. Demand-site electricity markets have a longer distribution chain and more intermediaries than the supply-side, which is attributable in part to the ultimately retail nature of demand and the wholesale nature of supply, and in part indicates market failures.

  16. Natural resource management activities at the Savannah River Site. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-07-01T23:59:59.000Z

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  17. Planning vs. dynamic control: Resource allocation in corporate clouds

    E-Print Network [OSTI]

    Cengarle, Mara Victoria

    in a static way such that energy costs are minimized. Live migration technology allows for dynamic resource workloads of transactional business applications dynamic resource allocation does not increase energy operational and management costs. Virtual- ization allows splitting and assigning physical servers to virtual

  18. UMTRA Project Office Records Management Plan

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office maintains two distinct records handling areas. One of the areas is maintained by a Technical Assistance Contractor (TAC), and is referred to as the UMTRA Project Document Control Center (UPDCC). The UPDCC manages all UMTRA records except those dealing with contracts, personnel, budgeting, finance, and any other documents which are of a purely administrative nature. The second area, the UMTRA Project Administrative Files Collection (UPAFC), contains all those records listed above that are not managed by the UPDCC. This Records Management Plan (RMP) for the UPAFC will be the framework for identifying the elements and activities that relate to the management and operational aspects involved in the handling of UPAFC. Guidelines for the program will be obtained from US Department of Energy (DOE) Orders. DOE Orders implement the guidelines issued by the National Archives and Records Administration (NARA), the final authority for records management. The RMP will address the life cycle of records, including their creation, maintenance, use, and disposition.

  19. Human Resources Staffing Plan for the Tank Farm Contractor

    SciTech Connect (OSTI)

    BOSLEY, J.W.

    2000-04-22T23:59:59.000Z

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline.

  20. Driving Resource Management With ApplicationLevel Quality of Service

    E-Print Network [OSTI]

    Katchabaw, Michael James

    Driving Resource Management With ApplicationLevel Quality of Service Specifications Michael Jdriven approach to resource management to support quality of service. We present our general strategy, the design resource management. Appeared in Decision Support Systems Journal, Volume 28, Elsevier Science Press, 2000

  1. DOE-ORP Contract Management Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOffice ofHale Plan24,7, 2012 Bill Taylor,ORP

  2. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26T23:59:59.000Z

    The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

  3. EIS-0182: Western Area Power Administration Energy Planning and Management Program

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

  4. Arid Lands Ecology Facility management plan

    SciTech Connect (OSTI)

    None

    1993-02-01T23:59:59.000Z

    The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

  5. Employment Opportunity at Plan-It Geo Natural Resources Technician ($13-16/hour dep. on qualifications/experience)

    E-Print Network [OSTI]

    , water resources analysis, and decision support systems. We are seeking a full-time, entry-level team or background in forestry, urban ecology, ecosystems management, water/natural resources inventory, or land use involving GIS, remote sensing, and web- based solutions for urban forest planning, cost/benefit analysis

  6. An Incentive Compatible Mechanism for Distributed Resource Planning

    E-Print Network [OSTI]

    Wu, David

    process and their economic incentives. If agents are not provided with proper incentives, they mayAn Incentive Compatible Mechanism for Distributed Resource Planning Erhan Kutanoglu Department is that without proper incentives, agents may not reveal this information trufully and they may not behave

  7. Water Management Plans for Surface Coal Mining Operations (North Dakota)

    Broader source: Energy.gov [DOE]

    A water management plan is required for all surface coal mining operations. This plan must be submitted to the State Engineer of the State Water Commission at the same time a surface mining permit...

  8. Management and operating contractor plan for transition to the project Hanford Management Contractor

    SciTech Connect (OSTI)

    Waite, J.L., Westinghouse Hanford

    1996-06-27T23:59:59.000Z

    This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

  9. Strategic Energy Management Plan For Fort Buchanan, Puerto Rico

    SciTech Connect (OSTI)

    Parker, Steven A.; Hunt, W. D.

    2001-10-31T23:59:59.000Z

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

  10. area management plan: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 NEW RIVER AREA OF CRITICAL ENVIRONMENTAL CONCERN MANAGEMENT PLAN CiteSeer Summary: New River is a dynamic, ever-changing system influenced by biological, climatological,...

  11. Spent Nuclear Fuel project integrated safety management plan

    SciTech Connect (OSTI)

    Daschke, K.D.

    1996-09-17T23:59:59.000Z

    This document is being revised in its entirety and the document title is being revised to ``Spent Nuclear Fuel Project Integrated Safety Management Plan.

  12. California Groundwater Management Plans | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainableCSL Gas Recovery Biomass16 2013Management86 Jump to:OtherOther:

  13. Project Management Plan - Small Producers Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report:Project ManagementRPSEA

  14. Integrated Planning and Management for Urban Water Supplies

    E-Print Network [OSTI]

    Pasternack, Gregory B.

    Positions for Water Supply Reliability ................................. 15 4 Shortage Management Modeling.2: Diagram of Water Supply Reliability Model Structure ..................49 5.3: Steps Used in ShortageIntegrated Planning and Management for Urban Water Supplies Considering Multiple Uncertainties Jay

  15. Overview of the Environmental and Water Resources Institute's "Guidelines For Integrated Water Resources Management" Project

    SciTech Connect (OSTI)

    Gerald Sehlke

    2005-03-01T23:59:59.000Z

    Integrated Water Resources Management is a systematic approach to optimizing our understanding, control and management of water resources within a basin to meet multiple objectives. Recognition of the need for integrating water resources within basins is not unique to the Environmental and Water Resources Institutes Integrated Water Resources Management Task Committee. Many individuals, governments and other organizations have attempted to develop holistic water resources management programs. In some cases, the results have been very effective and in other cases, valiant attempts have fallen far short of their initial goals. The intent of this Task Committee is to provide a set of guidelines that discusses the concepts, methods and tools necessary for integrating and optimizing the management of the physical resources and to optimize and integrate programs, organizations, infrastructure, and socioeconomic institutions into comprehensive water resources management programs.

  16. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect (OSTI)

    Childs, Allen

    2002-03-01T23:59:59.000Z

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  17. Resources Annotation, Retrieval and Presentation: a Semantic Annotation Management System

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    for the management of metadata records, each attribute of the record being represented by one or more triples to the resource management system itself. Expressing metadata records in RDF allows us to see metadata as semanticResources Annotation, Retrieval and Presentation: a Semantic Annotation Management System M. Albert

  18. Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies University Context 2006 #12;#12;Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies admitting or employing units or to the Equity and Diversity Resource Center, 179A Bascom Hall, 608/263- 2378

  19. University of Glasgow Carbon Management Programme Carbon Management Plan working with

    E-Print Network [OSTI]

    Mottram, Nigel

    fully in the initiatives which will help us reduce our carbon footprint and combat climate changeUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon Management Programme Carbon Management Plan (CMP) Albert Young, 3 November 2009 #12;University of Glasgow

  20. Proposed resource evaluation plan. Salton Sea scientific drilling program

    SciTech Connect (OSTI)

    Not Available

    1985-03-01T23:59:59.000Z

    The report presents a plan for evaluating the deep geothermal resource in the Salton Sea area of Imperial County, California. The plan is divided into two testing programs, followed by the modeling and evaluation of the underground geothermal resource. The testing program related to geological data collection includes acquiring and analyzing the core, running geophysical and temperature/pressure logs in both the deep well and the injection well, and carrying out extensive mud-logging activities. The flow testing program includes temperature, pressure, and flow measurements made in the well and surface facilities. Sampling and analysis of fluid and scale both in the well and at the surface facilities will also be carried out. 6 refs., 7 figs., 7 tabs. (ACR)

  1. Louisiana Solid Waste Management and Resource Recovery Law (Louisiana)

    Broader source: Energy.gov [DOE]

    The Louisiana Department of Environmental Quality manages solid waste for the state of Louisiana under the authority of the Solid Waste Management and Resource Recover Law. The Department makes...

  2. Owyhee Subbasin Plan Chapter 4 Owyhee Management Plan

    E-Print Network [OSTI]

    & Game Ray Lister, Bureau of Land Management Allyn Meuleman, U.S. Bureau of Reclamation Bradley, Bureau of Land Management Pam Druliner, Bureau of Land Management Tim Dykstra, Biologist, Shoshone Inter-Tribal Fish Commission Brent Grasty, Bureau of Land Management Tracy Hillman, Principal

  3. Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily

    E-Print Network [OSTI]

    Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily Load for Flathead Lake, Montana. #12;11/01/01 DRAFT i October 30, 2001 Draft Nutrient Management Plan and Total Maximum Daily Load..............................................................................................................................2-11 SECTION 3.0 APPLICABLE WATER QUALITY STANDARDS

  4. Lead Exposure Management Plan 1.0. Policy

    E-Print Network [OSTI]

    de Lijser, Peter

    Lead Exposure Management Plan 1.0. Policy CSUF has developed the Lead Exposure Management Plan to reduce occupational and environmental exposure to lead, a potent neurotoxin and carcinogen that causes considers the nature of the task involved, confirmed and presumed exposures, and the lead content

  5. Industrial Engineering & ManagementStrategic Plan 2014-2018

    E-Print Network [OSTI]

    Piao, Daqing

    Industrial Engineering & ManagementStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Industrial Engineering and Management at Oklahoma State University and first Ph.D. in 1960. This School has been represented and led by giants in Industrial Engineering

  6. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  7. TOPIC REVIEWS IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT

    E-Print Network [OSTI]

    Mcilwain, Jenny

    of Technology Assessment of the U. S. Congress as part of a broader study of renewable resource management for U of Introduced Animal Species on Renewable Resources in the U. S.-Affiliated Pacific Islands, by LUCIUS G

  8. ORIGINAL PAPER Resource management and fertility in Mexico's Sian

    E-Print Network [OSTI]

    Lopez-Carr, David

    Fishing Á Resource management Á Population Á Environment Á Mexico Á Latin America Á Caribbean Introduction (Brown 1997). Regulating human fertility and the extraction of non- renewable resources are logical

  9. Vermont Agency of Natural Resources Wastewater Management Division...

    Open Energy Info (EERE)

    Vermont Agency of Natural Resources Wastewater Management Division Water Pollution Control Permit Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  10. adaptive resource management: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT Biology and Medicine Websites Summary: of Technology Assessment of the U. S. Congress as part of a broader study of renewable...

  11. aquatic resource management: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT Biology and Medicine Websites Summary: of Technology Assessment of the U. S. Congress as part of a broader study of renewable...

  12. air resource management: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT Biology and Medicine Websites Summary: of Technology Assessment of the U. S. Congress as part of a broader study of renewable...

  13. Data Management Resources at the Office of Science User Facilities...

    Office of Science (SC) Website

    Data Management Resources National Energy Research Scientific Computing Center (NERSC) LBNL Link External link Argonne Leadership Computing Facility (ALCF) ANL Link External link...

  14. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2002-03-01T23:59:59.000Z

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

  15. Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

  16. Rainwater Wildlife Area Management Plan : Executive Summary.

    SciTech Connect (OSTI)

    Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

    2002-02-01T23:59:59.000Z

    The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

  17. Amarillo National Resource Center for Plutonium 1999 plan

    SciTech Connect (OSTI)

    NONE

    1999-01-30T23:59:59.000Z

    The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage.

  18. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    None

    2005-03-02T23:59:59.000Z

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.

  19. Resource Recovery and Management Act (Florida)

    Broader source: Energy.gov [DOE]

    The Department of Environmental Protection administers the state solid and hazardous waste management programs. The programs aim to:...

  20. Risk Management Plan Electron Beam Ion Source Project

    E-Print Network [OSTI]

    Risk Management Plan for the Electron Beam Ion Source Project (EBIS) Project # 06-SC-002. There are three specific areas of risk that can be controlled and managed by the EBIS Project team and these are and operations. The BNL ISM clearly indicates that risk management is everybody's business and will be factored

  1. Environmental Science and Resource Management Undergraduate Student Learning Objectives

    E-Print Network [OSTI]

    Anderson, Richard

    Environmental Science and Resource Management Undergraduate Student Learning Objectives Students completing the B.S. in Environmental Science and Resource Management will have the following: KNOWLEDGE SETS and environmental ethics. · Understand application of ecosystem and social concepts along the urban to wildland

  2. A Smart Energy System: Distributed Resource Management, Control and Optimization

    E-Print Network [OSTI]

    Beigl, Michael

    A Smart Energy System: Distributed Resource Management, Control and Optimization Yong Ding, Student of distributed energy resource and consumption management, which proposes to design a networked and embedded platform for realizing a dynamic energy mix and optimizing the energy consumption dy- namically. Based

  3. Towards Interoperability of ISO Standards for Language Resource Management

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    Towards Interoperability of ISO Standards for Language Resource Management Kiyong Lee Korea.romary@loria.fr Abstract This paper reviews and evaluates some of the ISO documents for language resource management. Being developed under ISO/TC 37/SC 4, these documents are at the last stage of approval and publication as interna

  4. TWRS systems engineering software configuration management plan

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-09T23:59:59.000Z

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  5. NREL Webinar: Treatment of Solar Generation in Electric Utility Resource Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    In this free webinar, you will hear how utilities are incorporating solar generation into their resource planning processes.

  6. Civil Works Planning Overview Civil Works (CW) Planning offers a structured, rational approach to solving water resources

    E-Print Network [OSTI]

    US Army Corps of Engineers

    , the current design and construction program is largely a result of project authorizations. Planning); and several implementing policies. CW Planning is the start of the "pipeline" for addressing water resources

  7. The Commission Forecast 1992 Report: Important Resource Planning Issues

    E-Print Network [OSTI]

    Adib, P.

    -side management (DSM) programs, power plant life extension, purchased power from other utilities, and TABLE 4 Installed Capacity by Service Areas (MW) Utility 1991 Utility 2001 PUC 2001 TU Electric 19,928 HL&P 13,584 CPL 4,398 CPS 3,901 GSU 6... rate classes. 73 ESL-IE-92-04-12 Proceedings from the 14th National Industrial Energy Technology Conference, Houston, TX, April 22-23, 1992 PLANNING ISSUES The Commission staff predicts that present generating reserves, including plants under...

  8. Numerical Analysis of Non-Constant Discounting with an Application to Renewable Resource Management

    E-Print Network [OSTI]

    Fujii, Tomoki; Karp, Larry

    2006-01-01T23:59:59.000Z

    AND K. G. L OFGREN (2000): Renewable Resources and Economican Application to Renewable Resource Management Tomoki Fujiiwith an Application to Renewable Resource Management Tomoki

  9. Los Alamos National Laboratory emergency management plan. Revision 1

    SciTech Connect (OSTI)

    Ramsey, G.F.

    1998-07-15T23:59:59.000Z

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  10. UW-Madison Records Management Public Records Campus Resources

    E-Print Network [OSTI]

    Sheridan, Jennifer

    UW-Madison Records Management Public Records Campus Resources Attached are some documents which are on the UW-Madison Records management website regarding Public Records, Email and Retention schedules. (May/ This one is about 20 minutes long. Both of these can also be access through the UW Records Management

  11. Managing Variable Energy Resources to Increase Renewable Electricity's

    E-Print Network [OSTI]

    Managing Variable Energy Resources to Increase Renewable Electricity's Contribution to the Grid P o Contribution of Renewable Energy to Total Electricity Generation? 15 ManaGInG VaRIablE EnERGy REsouRCEs 16 What l i c y m a k e r G u i d e #12;Variable energy resources, such as wind power, now produce about 3

  12. University of Dundee Carbon Management Plan

    E-Print Network [OSTI]

    Davidson, Fordyce A.

    Carbon Management Strategy 2.1 Our low carbon vision 6 2.2 Context and drivers for Carbon Management 6 2 and sources of funding 18 6 Actions to Embed Carbon Management in Your Organisation 19 6.1 Corporate Strategy Appendix A: Carbon Management Matrix - Embedding 23 Appendix B: Energy Prices 24 #12;3 FOREWORD FROM

  13. Dynamic Resource Management in Energy Constrained Heterogeneous Computing

    E-Print Network [OSTI]

    Maciejewski, Anthony A.

    Dynamic Resource Management in Energy Constrained Heterogeneous Computing Systems Using Voltage) in a manner that exploits the heterogeneity of the resources and tasks while considering the energy the resources are wireless and mobile, the limited battery capacity becomes a constraint and power or energy

  14. ECOSystem: Managing Energy as a First Class Operating System Resource

    E-Print Network [OSTI]

    Vahdat, Amin

    ECOSystem: Managing Energy as a First Class Operating System Resource Heng Zeng, Carla S. Ellis design. This paper explores how to support energy as a first-class operating system resource. En- ergy the limited energy resource among competing tasks. 1. INTRODUCTION Traditionally, the operating system plays

  15. Optimization for recipe-based, diet-planning inventory management

    E-Print Network [OSTI]

    Kang, Sheng

    2010-01-01T23:59:59.000Z

    This thesis presents a new modeling framework and research methodology for the study of recipe-based, diet-planning inventory management. The thesis begins with an exploration on the classic optimization problem - the diet ...

  16. FY 1999 Spent Nuclear Fuel Interim Management Plan

    SciTech Connect (OSTI)

    Dupont, M.

    1998-12-21T23:59:59.000Z

    This document has been prepared to present in one place the near and long-term plans for safe management of SRS SNF inventories until final disposition has been identified and implemented.

  17. Managing the Transition State for Energy Strategic Planning

    E-Print Network [OSTI]

    Koehler, T. A.

    MANAGING THE TRANSITION STATE FOR ENERGY STRATEGIC PLANNING a Thomas A. Koehler Eastman Kodak Company Rochester, New York ABSTRACT Corporate energy conservation programs have made substantial gains in reducing energy consumption during... the last decade. The responses to survive the mid-1970's global energy uncertainties were made in a crisis environment. Now, there is a transition from energy conservation to energy strategic planning. Energy engineers and managers need to im prove...

  18. 2012 Annual Planning Summary for Legacy Management

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

  19. Program Academic Quality Plan Department of Construction Management

    E-Print Network [OSTI]

    Moore, Paul A.

    Program Academic Quality Plan Department of Construction Management Bowling Green State University://www.bgsu.edu/colleges/technology/undergraduate/cmt/index.html Integral in this effort is our Program Academic Quality Plan. I. Bowling Green State University Mission Bowling Green State University provides educational experiences inside and outside the classroom

  20. Managing Energy and Server Resources in Hosting Centers Jeffrey S. Chase, Darrell C. Anderson, Prachi N. Thakar, Amin M. Vahdat

    E-Print Network [OSTI]

    Sirer, Emin Gun

    of delivered performance. The system continuously moni- tors load and plans resource allotments by estimating bandwidth) to insulate its customers from demand surges and capital costs for excess capacity. HostingManaging Energy and Server Resources in Hosting Centers Jeffrey S. Chase, Darrell C. Anderson

  1. Department of Energy Environment, Safety and Health Management Plan. Fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This report describes efforts by the Department of Energy (DOE) to effectively plan for environment, safety and health activities that protect the environment, workers and the public from harm. This document, which covers fiscal year 1996, reflects planning by operating contractors and Program Offices in early 1994, updated to be consistent with the President`s FY 1996 budget submittal to Congress, and subsequent Department of Energy Program refinements. Prior to 1992, only a small number of facilities had a structured process for identifying environment, safety and health (ES and H) needs, reporting the costs (in both direct and indirect budgets) of ES and H requirements, prioritizing and allocating available resources, and efficiently communicating this information to DOE. Planned costs for ES and H activities were usually developed as an afterthought to program budgets. There was no visible, consistently applied mechanism for determining the appropriate amount of resources that should be allocated to ES and H, or for assuring that significant ES and H vulnerabilities were planned to be funded. To address this issue, the Secretary (in November 1991) directed DOE to develop a Safety and Health Five-Year Plan to serve as a line management tool to delineate DOE-wide programs to reduce and manage safety and health risks, and to establish a consistent framework for risk-based resource planning and allocation.

  2. RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING

    E-Print Network [OSTI]

    Maranas, Costas

    RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman valuations and a risk management analysis for balancing risk versus reward tradeoffs. The resulting valuation that minimize risk for a specified level of return, to begin Phase I clinical testing from a set of candidate

  3. Management Plan Large-Area Time-of-Flight System

    E-Print Network [OSTI]

    Llope, William J.

    Management Plan for the Large-Area Time-of-Flight System for STAR at Brookhaven National Laboratory For the U.S. Department of Energy Office of Science Office of Nuclear Physics December 1, 2005 #12;2 STAR Project Manager Timothy Hallman STAR Spokesman Brookhaven National Lab approval: Thomas Ludlam BNL Project

  4. Carbon Management Plan for the Exeter Campuses 2010-2020

    E-Print Network [OSTI]

    Bearhop, Stuart

    Programme www.exeter.ac.uk/sustainability #12;Version 2010v1 dated 8/03/2011 Page 2 Owner G Whitehouse Energy Manager Carbon Management Plan 2010 - 2020 Contents 1 Forewords 1.1 Foreword from the Vice Drivers 3.4.2 National Drivers - Legislation 3.4.3 National Drivers Government Strategy for Carbon

  5. Water Management Plan for Fort Buchanan, Puerto Rico

    SciTech Connect (OSTI)

    Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine

    2004-06-01T23:59:59.000Z

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.

  6. Dynamic resource allocation for energy management in data centers

    E-Print Network [OSTI]

    Rincon Mateus, Cesar Augusto

    2009-05-15T23:59:59.000Z

    In this dissertation we study the problem of allocating computational resources and managing applications in a data center to serve incoming requests in such a way that the energy usage, reliability and quality of service considerations are balanced...

  7. Occupational Pension Schemes and Human Resource Management: Some Survey Evidence

    E-Print Network [OSTI]

    White, Phil; Terry, N

    1997-01-01T23:59:59.000Z

    Definitions of Human Resource Management (HRM) have been both numerous and multifaceted and various classifications have been arranged to try to capture the essence of HRM. Although there is not one rigid "HRM position", it does appear...

  8. CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I

    SciTech Connect (OSTI)

    Denney, R.D.

    1995-10-01T23:59:59.000Z

    The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP.

  9. Office of Human Resources -Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT

    E-Print Network [OSTI]

    Yener, Aylin

    the work of two (2) or more employees · Majority of time is spent directly managing people (i.e. over 50Office of Human Resources - Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT Typically includes, but is not limited to activities such as: Manages direct reports where primary duty

  10. Total Quality Management: Managing the Human Dimension in Natural Resource Agencies1

    E-Print Network [OSTI]

    Standiford, Richard B.

    Total Quality Management: Managing the Human Dimension in Natural Resource Agencies1 Denzil Verardo business is conducted in the public sector, and Total Quality Management (TQM) can be the avenue relationships within the DPR and make recommendations for change. Total Quality Management team practices were

  11. 2011-2015 Human Capital Management Plan

    Broader source: Energy.gov (indexed) [DOE]

    in the number of sites and the significant differences between managing Uranium Mill Tailings Radiation Control Act (UMTRCA) sites; Comprehensive Environmental Response,...

  12. Idaho National Laboratory Cultural Resource Management Office FY 2010 Activity Report

    SciTech Connect (OSTI)

    Hollie K. Gilbert; Clayton F. Marler; Christina L. Olson; Brenda R. Pace; Julie Braun Williams

    2011-09-01T23:59:59.000Z

    The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500 year span of human land use in the region. As a federal agency, the Department of Energy, Idaho Operations Office (DOE-ID) has legal responsibility for the management and protection of the resources and has contracted these responsibilities to Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts the challenge of preserving INL cultural resources in a manner reflecting their importance in local, regional, and national history. This report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2010. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be informative to both internal and external stakeholders and to serve as a planning tool for future INL cultural resource management work.

  13. Idaho National Laboratory Cultural Resource Management Office FY 2011 Activity Report

    SciTech Connect (OSTI)

    Julie Braun Williams; Brenda R. Pace; Hollie K. Gilbert; Christina L. Olson

    2012-09-01T23:59:59.000Z

    The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500 year span of human land use in the region. As a federal agency, the Department of Energy, Idaho Operations Office (DOE-ID) has legal responsibility for the management and protection of the resources and has contracted these responsibilities to Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts the challenge of preserving INL cultural resources in a manner reflecting their importance in local, regional, and national history. This report is intended as a stand-alone document that summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2011. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be informative to both internal and external stakeholders, serve as a planning tool for future INL cultural resource management work, and meet an agreed upon legal requirement.

  14. TWRS safety and technical integration risk management plan

    SciTech Connect (OSTI)

    Fordham, R.A.

    1996-03-12T23:59:59.000Z

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization.

  15. SECTION 10 Table of Contents 10 Coeur d' Alene Subbasin Management Plan ...............................................2

    E-Print Network [OSTI]

    and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can10-1 SECTION 10 ­ Table of Contents 10 Coeur d' Alene Subbasin Management Plan....................................................................................................................35 #12;10-2 10 Coeur d' Alene Subbasin Management Plan The Coeur d' Alene Subbasin Management Plan

  16. SECTION 26 Table of Contents 26 Spokane Subbasin Management Plan .........................................................2

    E-Print Network [OSTI]

    Work Teams and the process used to develop and adopt the management plan can be found in Section 126-1 SECTION 26 ­ Table of Contents 26 Spokane Subbasin Management Plan .........................................................................27 #12;26-2 26 Spokane Subbasin Management Plan The Spokane Subbasin Management Plan was developed

  17. SECTION 18 Table of Contents 18 Pend Oreille Subbasin Management Plan....................................................2

    E-Print Network [OSTI]

    of the Subbasin Work Teams and the process used to develop and adopt the management plan can be found in Section 118-1 SECTION 18 ­ Table of Contents 18 Pend Oreille Subbasin Management Plan;18-2 18 Pend Oreille Subbasin Management Plan The Pend Oreille Subbasin Management Plan was developed

  18. SECTION 50 Table of Contents 50 Lake Rufus Woods Management Plan .........................................................2

    E-Print Network [OSTI]

    and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can50-1 SECTION 50 ­ Table of Contents 50 Lake Rufus Woods Management Plan .........................................................................28 #12;50-2 50 Lake Rufus Woods Management Plan The Lake Rufus Woods Subbasin Management Plan

  19. SECTION 34 Table of Contents 34 Upper Columbia Management Plan..............................................................2

    E-Print Network [OSTI]

    and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can34-1 SECTION 34 ­ Table of Contents 34 Upper Columbia Management Plan .........................................................................25 #12;34-2 34 Upper Columbia Management Plan The Upper Columbia Subbasin Management Plan

  20. SECTION 42 Table of Contents 42 San Poil Subbasin Management Plan ..........................................................2

    E-Print Network [OSTI]

    of the Subbasin Work Teams and the process used to develop and adopt the management plan can be found in Section 142-1 SECTION 42 ­ Table of Contents 42 San Poil Subbasin Management Plan .........................................................................22 #12;42-2 42 San Poil Subbasin Management Plan The San Poil Subbasin Management Plan was developed

  1. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Broader source: Energy.gov [DOE]

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  2. EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. EM officials wrote a chapter of a recently published book, Managing Nuclear Projects A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and lessons learned. Authors from France, Germany, Argentina, Belgium, Finland, Austria, and the U.S. contributed to the book.

  3. Standardization of an API for Distributed Resource Management Peter Troger

    E-Print Network [OSTI]

    Weske, Mathias

    Standardization of an API for Distributed Resource Management Systems Peter Troger Hasso concepts of the finalized API, and explain is- sues and findings with the standardization Management Application API (DRMAA) specification is a software standard de- veloped in the Open Grid Forum

  4. Water resources planning under climate change and variability

    E-Print Network [OSTI]

    O'Hara, Jeffrey Keith

    2007-01-01T23:59:59.000Z

    transfers or options. Demand-side management includes thepricing schemes, and demand-side management for urban water,of alternate demand side management, particularly

  5. Efficient Resource Management for Cloud Computing Environments

    E-Print Network [OSTI]

    in today's society is generated from fossil fuels which produce harmful CO2 emissions. Therefore becoming increasingly important in a world with limited energy resources and an ever-rising demand for more power, storage, platforms, and services are deliv- ered on demand to external customers over

  6. Project Management Plan (PMP) for International Atomic Energy Agency (IAEA) Safeguards Project

    SciTech Connect (OSTI)

    BARTLETT, W.D.

    1999-09-14T23:59:59.000Z

    This plan presents the overall objectives, description, justification and planning for the PFP IAEA project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP) HNF-3617 Rev 0.

  7. "Modeling for effective and sustainable water resources management."

    E-Print Network [OSTI]

    Acton, Scott

    "Modeling for effective and sustainable water resources management." Teresa Culver Associate Professor tculver@virginia.edu ce.virginia.edu/faculty/culvert.html Dept. of Civil & Environmental Engineering University of Virginia Charlottesville, VA 434.982.6375 Environmental & Water Resources Group We

  8. Center for Environmental Management of Military Lands (970) 491-2748 cemml@cemml.colostate.edu

    E-Print Network [OSTI]

    in cultural resources management planning and compliance. The goal is to ensure that these diverse services: Planning level surveys for archaeological resources, traditional cultural properties and structures Integrated Cultural Resource Management Plans (ICRMPs) Archaeological resource monitoring

  9. NATURAL RESOURCE RECREATION Graduates work in a variety of federal, state, and local resource manage-

    E-Print Network [OSTI]

    resource manage- ment agencies, nonpro t environmental conservation and education organi- zations Environmental Educator Environmental Technician Event Coordinator Event Specialist Field Crew Field Instructor Guide Wilderness Ranger Wilderness Technician A-1 Wildwater Admiralty Environmental Adventures Cross

  10. Final Project Plan/Project Management Plan, January 1995.

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling7111AWell:F E ," POST 2,000LIST OF ACRONYMS

  11. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01T23:59:59.000Z

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  12. Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site

    SciTech Connect (OSTI)

    C. A. Wills

    2001-03-01T23:59:59.000Z

    The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan.

  13. Lake Chelan Fishery Management Plan Washington Department of Fish and Wildlife

    E-Print Network [OSTI]

    ........................................................... Monitoring changes in cutthroat and rainbow trout management........ Creel survey methods1 Appendix D Lake Chelan Fishery Management Plan Washington Department of Fish and Wildlife 2002 #12;2 LAKE CHELAN FISHERY MANAGEMENT PLAN TABLE OF CONTENTS ACKNOWLEDGEMENTS

  14. Texas Facilities Commission's Facility Management Strategic Plan

    E-Print Network [OSTI]

    Ramirez, J. A.

    , Texas, November 17 - 19, 2009 Facility Strategic Plan ?High Performance Building Approach ? Envelope ? Load Reduction ? (Re)Design ? Advanced Tactics ?Building Automation ? Sub-metering ? Controls ?Commissioning ? Assessment ? Continuous ?Facility... International Conference for Enhanced Building Operations, Austin, Texas, November 17 - 19, 2009 Commissioning Assessment ?30 buildings ?CC Opportunities ?O&M Improvements ?Energy/Capital Improvement Opportunities ?Quick Payback Implementation ?Levering DM...

  15. Management and Performance PERFORMANCE REPORTING AND PLANNING

    E-Print Network [OSTI]

    Waliser, Duane E.

    2015 Performance Plan, starting with the currently reported year of FY 2013 and spanning backward from FY 2008 to FY 2012, go to http://www.nasa.gov/about/budget/PAR_Reports.html. The combined report 2014 and/or FY 2015. The performance goal summary is followed by: · The annual performance indicators

  16. Disruption Management ( Operations Research between planning ...

    E-Print Network [OSTI]

    In ship-building , production plans usually allo w some fl exibility. ... creasing the cost of production gives rise to an increased demand for robustness in ..... H o w ever , from the passenger side it is the w orst option , since a group of customers.

  17. Oak Ridge National Laboratory Waste Management Plan. Revision 1

    SciTech Connect (OSTI)

    Forgy, Jr., J. R.

    1991-12-01T23:59:59.000Z

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  18. Deputy Director for Resource Management Staff Jobs

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron4 Self-Scrubbing:,,of ScienceCurrent ProjectsResearch(SC) HomeScience

  19. Project Management Resources | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO Overview OCHCODepartment ofRecipientsand Project AnalysisID Project Name

  20. Office of Resource Management | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732onMake YourDepartment ofC TEnergy Nuclear

  1. ORISE: National Security and Emergency Management Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparencyDOE ProjectCrisisIndependentThe(MARSSIM)ORISE

  2. Vehicle Technologies Office: Resources for Sustainability Managers |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015ofDepartment of Energy MicrosoftVOLUME I AThe VehicleSeveralEnergy

  3. Environmental Resources Management ERM | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazel Crest,EnergySerranopolisEnviroMission Ltd JumpFundEnvironmentaldo:

  4. DOE Human Resources Management Division - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMFormsGas SeparationsRelevant toSiteCurrentAdvanced

  5. Environmental and Resource Studies -Canadian Studies 250 Environmental and Resource Management: Canadian Perspectives

    E-Print Network [OSTI]

    Fox, Michael

    in the ground, or what level of "harvesting" is the highest that can be sustained without damage to the resource to human beings? The course combines a discussion of theoretical approaches to managing renewable and non-renewable resources: energy, agriculture, parks, forests, water and watersheds, fisheries, and wildlife. The course

  6. Appalachian State University Water Resources Planning Committee Impacts of Urbanization on Headwater

    E-Print Network [OSTI]

    Thaxton, Christopher S.

    Temperature surges (Summer Months): Contact and runoff from impervious surfaces during afternoon rain storms by groundwater influx UPSTREAM MIDSTREAM DOWNSTREAM #12;Appalachian State University Water Resources Planning

  7. University of Surrey Carbon Management Plan

    E-Print Network [OSTI]

    Doran, Simon J.

    and embed within all aspects of our business energy and carbon reduction behaviours and initiatives. 3) To reduce our costs of energy, reduce risks and prepare the University Managing Price Volatility and putting, Impact of CRC 2.4 Reduced Consumption, Emission & Cost 2.5 Reputational Drivers 3.0 University Carbon

  8. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01T23:59:59.000Z

    Goal.6 Figure 2-2. Accounting for Energy Efficiency2-3. Accounting for Energy Efficiency Resources in LoadFigure 3-1. Plan Energy Efficiency Program Effects: Annual

  9. Strategic Planning -College -Agricultural Sciences & Natural Resources Unit Assessment Report -Four Column

    E-Print Network [OSTI]

    Zhang, Yuanlin

    Strategic Planning - College - Agricultural Sciences & Natural Resources Unit Assessment Report - Four Column Texas Tech University Priorities Means of Assessment & Criteria / Tasks Results Action & Natural Resources - 2013 Priority 1_Increase Enrollment and Promote Student Success (CASNR - Outcome 1

  10. Introducing the use of integrated Decision Support System in Natural Resources Planning

    E-Print Network [OSTI]

    Park, Hye Yeon, S.M. Massachusetts Institute of Technology

    2008-01-01T23:59:59.000Z

    The target subject of Natural Resources Planning (NRP) includes various systems and their elements, all of which are centered around the natural resource system. Given this characteristic complexity and a high degree of ...

  11. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-07-01T23:59:59.000Z

    The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

  12. Management implementation plan for a safety analysis and review system

    SciTech Connect (OSTI)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01T23:59:59.000Z

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply.

  13. NEW - DOE O 350.1 Chg 5, Contractor Human Resource Management Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  14. Information Technology Standards Program management plan

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  15. Puget Sound Dredged Disposal Analysis: Management plan assessment report. Dredged Material Management Year 1990

    SciTech Connect (OSTI)

    Not Available

    1991-03-01T23:59:59.000Z

    Puget Sound Dredged Disposal Analysis (PSDDA) is an interagency program for the management of unconfined, open-water disposal of dredged material into Puget Sound, Washington. The Management Plans for the PSDDA program identify disposal sites, describe dredged material evaluation procedures, and establish site monitoring and management practices. The plans also commit the involved agencies to a cooperative annual review process which evaluates disposal site use and conditions, dredged material testing results, and new scientific information, in order to determine if changes to the evaluation procedures and/or disposal site management practices are needed. Sampling was conducted to determine any chemical/biological contamination.

  16. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  17. A Statewide Pest Management Plan for Texas.

    E-Print Network [OSTI]

    1981-01-01T23:59:59.000Z

    . TAEX. Ama- rillo Reyes, Mr. Lucas, Research Scientist-Field Crops, TAES. Corpus Christi Rice, Mr. Marlin E.. Extension Agent-Entomology (Pest Manage- ment). TAEX, Wharton Robinson, Dr. James V., Area Extension Entomologist, TAEX. Overton Rogers... insect field scouts who systematically inspected farm crops for insects and their damage, beneficial insects and the progress of plant fruiting. The field scouting demonstration encompassed 6,000 to 15,000 crop acres within the 2- to 3-county areas...

  18. Technical assistance contractor Management Plan. Final [report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  19. Emergency Management: Facility Emergency Plan Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContractElectron-State Hybridization inperspectivesCommunications20,

  20. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    SciTech Connect (OSTI)

    Childs, Allen B.

    2002-02-01T23:59:59.000Z

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.

  1. Apparatus and method for managing digital resources by passing digital resource tokens between queues

    DOE Patents [OSTI]

    Crawford, Henry J. (Berkeley, CA); Lindenstruth, Volker (El Cerrito, CA)

    1999-01-01T23:59:59.000Z

    A method of managing digital resources of a digital system includes the step of reserving token values for certain digital resources in the digital system. A selected token value in a free-buffer-queue is then matched to an incoming digital resource request. The selected token value is then moved to a valid-request-queue. The selected token is subsequently removed from the valid-request-queue to allow a digital agent in the digital system to process the incoming digital resource request associated with the selected token. Thereafter, the selected token is returned to the free-buffer-queue.

  2. Apparatus and method for managing digital resources by passing digital resource tokens between queues

    DOE Patents [OSTI]

    Crawford, H.J.; Lindenstruth, V.

    1999-06-29T23:59:59.000Z

    A method of managing digital resources of a digital system includes the step of reserving token values for certain digital resources in the digital system. A selected token value in a free-buffer-queue is then matched to an incoming digital resource request. The selected token value is then moved to a valid-request-queue. The selected token is subsequently removed from the valid-request-queue to allow a digital agent in the digital system to process the incoming digital resource request associated with the selected token. Thereafter, the selected token is returned to the free-buffer-queue. 6 figs.

  3. Integrated safeguards and security management plan

    SciTech Connect (OSTI)

    Bowen, Sue, editor

    2001-04-16T23:59:59.000Z

    Berkeley Lab is committed to scientific excellence and stewardship of its assets. While security principles apply to all work performed at the Laboratory, their implementation is flexible. Berkeley Lab adheres to the following principles: Line management owns security; Security roles and responsibilities are clearly defined and communicated; Security functions are integrated; An open environment supports the Laboratory's Mission; The security program must support the scientific and operational missions of the Laboratory and must be value added; and Security controls are tailored to individual and facility requirements.

  4. Strategic Energy Management Plan for the Santa Ynez Band of Chumash...

    Office of Scientific and Technical Information (OSTI)

    Strategic Energy Management Plan for the Santa Ynez Band of Chumash Indians Re-direct Destination: This plan outlines the Santa Ynez Band of Chumash Indians' comprehensive energy...

  5. Recommended Academic Plan for Agricultural Systems Management (ASM) University Park

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for Agricultural Systems Management (ASM) University Park Effective requirements. GWS, GHA, GQ, GN, GA, GH, and GS are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States

  6. Recommended Academic Plan for Agricultural Systems Management (ASM) Commonwealth Campuses

    E-Print Network [OSTI]

    Omiecinski, Curtis

    Recommended Academic Plan for Agricultural Systems Management (ASM) Commonwealth Campuses Effective Education requirements. GWS, GHA, GQ, GN, GA, GH, and GS are codes used to identify General Education requirements. US, IL, and US;IL are codes used to designate courses that satisfy University United States

  7. ARM - Data Management and Documentation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492air Comments? We would love to heargovInstrumentstdmaDaily Report Archive Related

  8. Contract Management Plan Outline | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613PortsmouthBartlesvilleAbout » Contact Us Contact UsEnergy Awarded to Small

  9. LFRG Program Management Plan | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732on ArmedManufacturingJune 17, 2015 -EnergyCharter

  10. Project Management Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 | Department ofPlantLong Island HTS -PublicationThe

  11. MA - Office of Management - Energy Conservation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil & Gas »ofMarketing |Prepare For more(Version 3.0) | DepartmentMA

  12. Software Configuration Management Plan | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Site EnvironmentalEnergySafely Delivering DOE'sEnergy3 SGIGof EnergySofiaSoftware

  13. LPP Risk Management Plan | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked Questions for DOEtheInspection15Department10PM toON5 LMTrade |Truck into then

  14. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM Flash2011-12Approvedof6, 1945: Trinityof EnergyLED LightingD C

  15. Emergency Management: Facility Emergency Plan Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContractElectron-State Hybridization inperspectivesCommunications20, 130 ,131

  16. Emergency Management: Facility Emergency Plan Template

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContractElectron-State Hybridization inperspectivesCommunications20, 130

  17. OSU Human Resources 106 Whitehurst, Stillwater, Oklahoma 74078 (405) 744-5449 OKLAHOMA COLLEGE SAVINGS PLAN

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    OSU Human Resources 106 Whitehurst, Stillwater, Oklahoma 74078 (405) 744-5449 OKLAHOMA COLLEGE SAVINGS PLAN The Oklahoma College Savings Plan (OCSP) provides OSU employees with a way to save and in certain situations abroad. Advantages of Using the Oklahoma College Savings Plan to Save for College

  18. Mississippi Water Resources Research Institute Annual Technical Report

    E-Print Network [OSTI]

    include: water quality, surface and groundwater management, water quality management and water resources Category: Water Quality Focus Category: Wetlands, Water Quality, Management and Planning Descriptors; to assist state agencies in the development and maintenance of a state water management plan

  19. active adaptive management: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begun to embrace the concept adaptive management as an alternative to traditional natural resource planning and management models. Adaptive management may provide BLM managers ......

  20. adaptive management tool: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    management as an alternative to traditional natural resource planning and management models. Adaptive management may provide BLM managers ... Brandenburg, Peter (Peter J.)...

  1. adaptive management department: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begun to embrace the concept adaptive management as an alternative to traditional natural resource planning and management models. Adaptive management may provide BLM managers ......

  2. A CULTURAL RESOURCES MONITORING AND DISCOVERY PLAN FOR MAINTENANCE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to potential discovery situations and to evaluate the discoveries eligibility for NRHP listing. FINAL Monitoring and Discovery Plan 12 EPG Western Area Power Administration...

  3. Wildland Fire Management Plan for Brookhaven National Laboratory

    SciTech Connect (OSTI)

    Schwager, K.; Green, T. M.

    2014-10-01T23:59:59.000Z

    The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildlandfire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled prescribed fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.

  4. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2008-09-01T23:59:59.000Z

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  5. Museum-on-Demand: Dynamic management of resources

    E-Print Network [OSTI]

    Celentano, Augusto

    1 Museum-on-Demand: Dynamic management of resources in World Wide Web museums Fabrizio Furano: Given the problem of building virtual museums, this paper discusses the tasks of retrieving, assembling. A virtual museum construction approach is pre- sented, in which a comprehensive database and a complex

  6. GIS IN LAND RESOURCE MANAGEMENT Distance Education Section

    E-Print Network [OSTI]

    Ma, Lena

    : In this course you will gain ample hands-on experience in using ArcGIS and geospatial analysis using real information system (GIS) and geospatial methods as applied to land resource management issues. GOOD TO KNOW projects and find solutions to geospatial problems. OTHER INFORMATION: The course counts towards the ICGIS

  7. Managing Network Resources in Condor Jim Basney and Miron Livny

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    usage in Condor. By managing network resources, these mechanisms provide administrative control over administrative network policies and to ensure that applications receive sufficient network capac- ity to compute provide statistics to the Condor administrator about how Condor ap- plications are using the network

  8. Managing Network Resources in Condor Jim Basney and Miron Livny

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    usage in Condor. By managing network resources, these mechanisms provide administrative control over administrative network policies and to ensure that applications receive sufficient network capac ity to compute provide statistics to the Condor administrator about how Condor ap plications are using the network

  9. Joint Energy Management and Resource Allocation in Rechargeable Sensor Networks

    E-Print Network [OSTI]

    Sinha, Prasun

    Joint Energy Management and Resource Allocation in Rechargeable Sensor Networks Ren-Shiou Liu CSE, The Ohio State University Email: rsliu@cse.ohio-state.edu Prasun Sinha CSE, The Ohio State University Email: prasun@cse.ohio-state.edu Can Emre Koksal ECE, The Ohio State University Email: koksal

  10. SNES 2000: Environmental Sciences Colloquium Water Resource Management

    E-Print Network [OSTI]

    Keinan, Alon

    SNES 2000: Environmental Sciences Colloquium Fall 2011 Water Resource Management Friday afternoons credit (required for SNES SO/SR, credit optional for others) The Environmental Sciences Colloquium is open to the entire Cornell community and the public. Contemporary environmental issues pose complex

  11. Towards All-IP Wireless Networks: Architectures and Resource Management

    E-Print Network [OSTI]

    Boutaba, Raouf

    Towards All-IP Wireless Networks: Architectures and Resource Management Mechanism Majid Ghaderi-IP network integrating different wireless technologies using IP and its associated service models. The first to facilitate the integration of wireless LAN and 3G cellular networks towards a uniform architecture for all

  12. Resource Management for Fading Wireless Channels with Energy Harvesting Nodes

    E-Print Network [OSTI]

    Ulukus, Sennur

    Resource Management for Fading Wireless Channels with Energy Harvesting Nodes Omur Ozel1 , Kaya of these systems is the fact that the nodes can harvest energy throughout the duration in which communication takes place. As such, transmission policies of the nodes need to adapt to these harvested energy arrivals

  13. Strategies for Energy Efficient Resource Management of Hybrid Programming Models

    E-Print Network [OSTI]

    1 Strategies for Energy Efficient Resource Management of Hybrid Programming Models Dong Li Member, with the accelerating adoption of hybrid programming models, we increasingly need improved energy efficiency in hybrid hybrid programming models that use both message-passing and shared- memory, due to the increasing

  14. Hierarchical Architecture for Real-Time Adaptive Resource Management

    E-Print Network [OSTI]

    Cardei, Ionut

    , Mihaela Cardei1 , Allalaghatta Pavan2 Honeywell Technology Center 3660 Technology Drive, Minneapolis, MN 55418, USA 1 {ionut, mihaela}@cs.umn.edu, 2 {jha, pavan}@htc.honeywell.com Abstract. This paper presents the Real Time Adaptive Resource Management system (RTARM1 ), developed at the Honeywell Technology Center

  15. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect (OSTI)

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01T23:59:59.000Z

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current resource plans can be used to support region-wide resource assessment and tracking of state/utility progress in meeting the WGA's energy-efficiency goals (WGA 2004); and (3) offer recommendations on information and documentation of energy-efficiency resources that should be included in future resource plans to facilitate comparative review and regional coordination. The scope of this report covers projected electric end-use efficiency investments reported in all Western utility resource plans that were publicly available as of February 2006. While a few utilities included additional demand-side resources, such as demand response, in their plans, we do not report that information. However, many of the issues and recommendations in reference to energy efficiency in this report are relevant to other demand-side resources as well. This report is organized as follows. Section 2 outlines the data sources and approach used in this study and conceptualizes methods and metrics for tracking energy-efficiency resources over time. Section 3 presents results from the review of the utility resource plans. Important issues encountered in reviewing the resource plans are discussed in section 4. Finally, section 5 concludes with recommendations for improving the tracking and reporting of energy efficiency in forthcoming resource plans.

  16. Production Experiences with the Cray-Enabled TORQUE Resource Manager

    SciTech Connect (OSTI)

    Ezell, Matthew A [ORNL] [ORNL; Maxwell, Don E [ORNL] [ORNL; Beer, David [Adaptive Computing] [Adaptive Computing

    2013-01-01T23:59:59.000Z

    High performance computing resources utilize batch systems to manage the user workload. Cray systems are uniquely different from typical clusters due to Cray s Application Level Placement Scheduler (ALPS). ALPS manages binary transfer, job launch and monitoring, and error handling. Batch systems require special support to integrate with ALPS using an XML protocol called BASIL. Previous versions of Adaptive Computing s TORQUE and Moab batch suite integrated with ALPS from within Moab, using PERL scripts to interface with BASIL. This would occasionally lead to problems when all the components would become unsynchronized. Version 4.1 of the TORQUE Resource Manager introduced new features that allow it to directly integrate with ALPS using BASIL. This paper describes production experiences at Oak Ridge National Laboratory using the new TORQUE software versions, as well as ongoing and future work to improve TORQUE.

  17. SAPHIRE 8 Software Configuration Management Plan

    SciTech Connect (OSTI)

    Curtis Smith

    2010-01-01T23:59:59.000Z

    The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

  18. Managing Floods and Resources at the Arroyo Las Positas

    SciTech Connect (OSTI)

    Sanchez, L; Van Hattem, M; Mathews, S

    2002-03-05T23:59:59.000Z

    Engineers and water resource professionals are challenged with protecting facilities from flood events within environmental resource protection, regulatory, and economic constraints. One case in point is the Arroyo Las Positas (ALP), an intermittent stream that traverses the Lawrence Livermore National Laboratory (LLNL) in Livermore, California. Increased runoff from post-drought rainfall, upstream development, and new perennial discharges from LLNL activities have resulted in increased dry weather flows and wetland vegetation. These new conditions have recently begun to provide improved habitat for the federally threatened California red-legged frog (Rana aurora draytonii; CRLF), but the additional vegetation diminishes the channel's drainage capacity and increases flood risk. When LLNL proposed to re-grade the channel to reestablish the 100-year flood capacity, traditional dredging practices were no longer being advocated by environmental regulatory agencies. LLNL therefore designed a desilting maintenance plan to protect LLNL facility areas from flooding, while minimizing impacts to wetland resources and habitat. The result was a combination of structural upland improvements and the ALP Five Year Maintenance Plan (Maintenance Plan), which includes phased desilting in segments so that the entire ALP is desilted after five years. A unique feature of the Maintenance Plan is the variable length of the segments designed to minimize LLNL's impact on CRLF movement. State and federal permits also added monitoring requirements and additional constraints on desilting activities. Two years into the Maintenance Plan, LLNL is examining the lessons learned on the cost-effectiveness of these maintenance measures and restrictions and reevaluating the direction of future maintenance activities.

  19. Fluid management plan for the Project Shoal Area Offsites Subproject

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject`s Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria.

  20. Site action plan for maintenance management program. Revision D

    SciTech Connect (OSTI)

    Pearson, A.W.

    1993-11-30T23:59:59.000Z

    (DOE) Order 4330.4B, ``Maintenance Management Program`` requires each site to develop a Site Action Plan for implementing a Maintenance Management Program. Nonnuclear facilities are required to address the 32 elements of Chapter 1: Guidelines for the Conduct of Maintenance at DOE Nonnuclear Facilities. This document details the degree of implementation for each element, and the Martin Marietta Specialty Components, Inc., plan for implementation of the items which remain to be completed. The original Pinellas Plant Maintenance Management Program Site Action Plan (Issue A) was completed March 27, 1991. The format was modified per DOE request and it was resubmitted as Issue B and approved by AL September 16, 1991. Issue C was submitted, and approved December 20, 1992. The most significant achievement during FY-93 were the implementation of plant wide Graded Approach, and Configuration Control programs. The methodologies for performing these activities were developed, and pilot programs were implemented to verify their effectiveness. Plant wide implementation of both programs is progressing on a high priority basis. The formalized method for grading equipment and facilities provides a basis for establishing uniform, risk based priorities. The risks involved are environment, safety, health and programmatic mission. Other achievements for FY-93, include the establishment of procedures for the decommissioning, and down-grading of facilities, improved work control, improved work performance reporting, improved quality plans, and improved operating procedures.

  1. Scenario Planning as the Development of Leadership Capability and Capacity; and Virtual Human Resource Development

    E-Print Network [OSTI]

    McWhorter, Rochell 1963-

    2011-08-03T23:59:59.000Z

    SCENARIO PLANNING AS THE DEVELOPMENT OF LEADERSHIP CAPABILITY AND CAPACITY; AND VIRTUAL HUMAN RESOURCE DEVELOPMENT A Dissertation by ROCHELL RAE MCWHORTER Submitted to the Office of Graduate Studies of Texas A&M University... Capability and Capacity; and Virtual Human Resource Development Copyright 2011 Rochell Rae McWhorter SCENARIO PLANNING AS THE DEVELOPMENT OF LEADERSHIP CAPABILITY AND CAPACITY; AND VIRTUAL HUMAN RESOURCE DEVELOPMENT A Dissertation...

  2. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect (OSTI)

    Miller, S.J.

    1995-11-01T23:59:59.000Z

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  3. Uncertainty Management in Optimal Disassembly Planning through Learning-based Strategies

    E-Print Network [OSTI]

    Reveliotis, Spiridon "Spyros"

    literature. Keywords: disassembly planning, product recovery, uncertainty management, reinforce- ment technical area of production system modelling, analysis and control. One particular theme that is emergingUncertainty Management in Optimal Disassembly Planning through Learning-based Strategies Spyros A

  4. Best Management Practice #1: Water Management Planning | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergy Christopher| Departmentof Energy 12:Energy 1:

  5. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect (OSTI)

    Myrick, T.E.

    1984-09-01T23:59:59.000Z

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  6. Tank monitor and control system (TMACS) software configuration management plan

    SciTech Connect (OSTI)

    GLASSCOCK, J.A.

    1999-05-13T23:59:59.000Z

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments.

  7. Planning for Mining Operations with Time and Resource Constraints

    E-Print Network [OSTI]

    Nir Lipovetzky

    2014-02-05T23:59:59.000Z

    Feb 5, 2014 ... Abstract: We study a daily mine planning problem where, given a set of blocks we wish to mine, our task is to generate a mining sequence for...

  8. Excess Uranium Inventory Management Plan | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Departmentof1-SCORECARD-09-21-11AprilWednesday,Technology LaboratoryPlan

  9. Planning for an Energy Management System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOilNEWResponse(Expired)of EnergyPlanned Audits andOne Planning

  10. Plan for Quality Management 2007-2010 THE UNIVERSITY OF GOTHENBURG

    E-Print Network [OSTI]

    Johannesson, Henrik

    Plan for Quality Management 2007-2010 THE UNIVERSITY OF GOTHENBURG Contents Preface 4 Purpose 5 Points of Departure 6 Specific Activities during 2007-2010 8 PREFACE This plan for quality management. In the plan, significant principles for quality management are described, as are a number of specific

  11. Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological

    E-Print Network [OSTI]

    Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey;#12;Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014: U.S. Geological

  12. Conference Topic: Integrated Water Resources and Coastal Areas Management National Water Information Systems: A Tool to Support Integrated Water Resources

    E-Print Network [OSTI]

    Barthelat, Francois

    of compartmentalized data, lack of central storage, and limited access to data for decision-making in water managementConference Topic: Integrated Water Resources and Coastal Areas Management National Water Information Systems: A Tool to Support Integrated Water Resources Management in the Caribbean Marie-Claire St

  13. Integrated Waste Treatment Unit GFSI Risk Management Plan

    SciTech Connect (OSTI)

    W. A. Owca

    2007-06-21T23:59:59.000Z

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

  14. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    SciTech Connect (OSTI)

    ROGERS, P.M.

    2000-06-01T23:59:59.000Z

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  15. Bay Resource Management Center Biomass Facility | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon, France:Barstow, California:BaselineResource Management

  16. FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT MEASURES FOR FLOOD MANAGEMENT SYSTEMS1

    E-Print Network [OSTI]

    Tullos, Desiree

    FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT variability/change; risk assessment; flood management; water resources flexibility.) DiFrancesco, Kara N of Assessment Measures for Flood Management Systems. Journal of the American Water Resources Association (JAWRA

  17. Pinellas Plant contingency plan for the hazardous waste management facility

    SciTech Connect (OSTI)

    NONE

    1988-04-01T23:59:59.000Z

    Subpart D of Part 264 (264.50 through .56) of the Resource Conservation and Recovery Act (RCRA) regulations require that each facility maintain a contingency plan detailing procedures to {open_quotes}minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water.{close_quotes}

  18. Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

  19. Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)

    SciTech Connect (OSTI)

    Higginson, M.C.

    1994-10-01T23:59:59.000Z

    The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

  20. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    SciTech Connect (OSTI)

    Morrison, M.I. [Midwest Technical Inc., Oak Ridge, Tennessee (United States); McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D. [Oak Ridge National Lab., TN (United States)

    1995-02-01T23:59:59.000Z

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections.

  1. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Riddle, Donna L.

    2007-05-03T23:59:59.000Z

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

  2. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    SciTech Connect (OSTI)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    2003-01-01T23:59:59.000Z

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

  3. Course helps professionals develop watershed protection plans: Texas water resources professionals gather

    E-Print Network [OSTI]

    Jensen, Ric

    2008-01-01T23:59:59.000Z

    tx H2O | pg. 6 Story by Ric Jensen Course helps professionals develop watershed protection plans | pg. 6 tx H2O | pg. 7 W ater resources professionals wanting training on watershed protection plan development are benefiting from a course... Casebolt of Texas State Soil and Water Conservation Board, Lucas Gregory of Texas Water Resources Institute, Vanessa Escobar of the Texas Water Development Board, and Ernest Moran of the San Antonio River Author- ity calculate load duration curves...

  4. RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS

    E-Print Network [OSTI]

    RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML assessments · Rangeland health assessments #12;RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL

  5. Vermont Agency of Natural Resources Wastewater Management Division Water

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planning methodologiesVenkataraya Fibres2072286°,Open

  6. Course helps professionals develop watershed protection plans: Texas water resources professionals gather

    E-Print Network [OSTI]

    Jensen, Ric

    2008-01-01T23:59:59.000Z

    tx H2O | pg. 6 Story by Ric Jensen Course helps professionals develop watershed protection plans | pg. 6 tx H2O | pg. 7 W ater resources professionals wanting training on watershed protection plan development are benefiting from a course...

  7. Business Continuity Planning Resources for Small- and Medium-Sized Businesses

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14T23:59:59.000Z

    This document/memo summarizes existing resources and guidance on business continuity planning for small- to medium-sized businesses. DTRA will share this information with large commercial businesses who identified the need to help their suppliers and other key collaborators prepare business continuity plans in order to speed recovery from a wide-area bioterrorism incident.

  8. Wildlife management plan, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    O'Farrell, T.P.; Scrivner, J.H.

    1987-01-01T23:59:59.000Z

    Under the Naval Petroleum Act of 1976, Congress directed the Secretary of the Navy and subsequently the Secretary of Energy, to produce petroleum products from Naval Petroleum Reserve No. 1 (NPR-1) in Kern County, California, at the maximum efficient rate consistent with sound engineering practices. Because of the presence of two endangered species and the quality, quantity, and contiguous nature of habitat on NPR-1, the area is unique and management of its resources deserves special attention. The purpose of this wildlife management plan is to: (1) draw together specific information on NPR-1 wildlife resources; (2) suggest management goals that could be implemented, which if achieved, would result in diverse, healthy wildlife populations; and (3) reinitiate cooperative agreements between the US Department of Energy (DOE) and other conservation organizations regarding the management of wildlife on NPR-1. NPR-1 supports an abundant and diverse vertebrate fauna. Twenty-five mammalian, 92 avian, eight reptilian, and two amphibian species have been observed on Elk Hills. Of these, three are endangered (San Joaquin kit fox, Vulpes macrotis mutica; giant kangaroo rat, Dipodomys ingens; blunt-nosed leopard lizard, Gambelia silus). Nine vertebrates, six invertebrates, and four plant species known to occur or suspected of occurring on Elk Hills are potential candidates for listing. A major objective of this management plan is to minimize the impact of petroleum development activities on the San Joaquin kit fox, giant kangaroo rat, blunt-nosed leopard lizard, and their essential habitats. This will mainly be achieved by monitoring the status of these species and their habitat and by restoring disturbed habitats. In general, management policies designed to benefit the above three species and other species of concern will also benefit other wildlife inhabiting NPR-1.

  9. Obtaining and Ensuring Persistence of O&M Savings Through Resource Conservation Management

    E-Print Network [OSTI]

    Miller, W.

    2001-01-01T23:59:59.000Z

    OBTAINING AND ENSURING PERSISTENCE OF O&M SAVINGS THROUGH RESOURCE CONSERVATION MANAGEMENT WILL MILLER ASSOCIATE DIRECTOR ? TECHNICAL SERVICES PORTLAND ENERGY CONSERVATION, INC. (PECI) PORTLAND, OREGON ABSTRACT Resource conservation management is a...

  10. PUREX/UO{sub 3} deactivation project management plan

    SciTech Connect (OSTI)

    Washenfelder, D.J.

    1993-12-01T23:59:59.000Z

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  11. DOE/SC-ARM-14-008 Data Management Facility Operations Plan NN Keck

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOffice ofHale Plan24,7,INL is6 ARM2034241578

  12. LLNL Site 200 Risk Management PlanAgust 2008

    SciTech Connect (OSTI)

    Pinkston, D; Johnson, M

    2008-07-30T23:59:59.000Z

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES&H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March 2008, has been included as an appendix to the RMP Supplemental Information document. LLNL Site 200 is a research and development laboratory with infrastructure necessary to support its operations and personnel. Research and development activities at LLNL are focused on stockpile stewardship; achieving robust and vital scientific, engineering, and manufacturing capability; inertial confinement fusion; laser technology; materials and process science; computational and information sciences; basic sciences; engineering sciences; and biological sciences. Based upon CalARP Program regulations, guidance found in California Accidental Release Prevention Program (CalARP) Administering Guidance, Chapter 1, a review of facility specific documents, accident analyses summarized in this document & detailed in the LLNL Site 200 RMP Supporting Information document, LLNL has determined that each process meeting the CalARP threshold criteria meets the requirements for CalARP Program Level 1. In accordance with CalARP regulations, LLNL considers the natural segmentation of processes at Site 200 to be on a building basis and therefore consideration of inventory should be on a building basis rather than a 'site-wide' basis. Only those materials identified as equal to as or greater than the threshold quantities for the CalARP program on a building (process) level are reflected in this document. As such, materials and quantities reported in this document on a building (process) level will vary from materials and quantities reported in the LLNL Hazardous Materials Business Plan, Acutely Hazardous Material Registration Form on a site-wide level. For each process involving regulated quantities of lithium hydride, worst case accident analysis shows that the toxic endpoint lies within the site boundaries. These analyses document that the nearest public receptor is beyond the distance to a toxic or flammable endpoint. Refer to the LLNL Site 200 RMP Supporting Information document for a more detailed explanation of the worst case accident analyses for these processes. For the process involvin

  13. Westinghouse Hanford Company FY 1996 Materials Management Plan (MMP)

    SciTech Connect (OSTI)

    Higginson, M.C.

    1995-12-01T23:59:59.000Z

    The safe and sound operation of facilities and the storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The assumptions, plans and Special Nuclear Material (SNM) inventory summaries contained in this document were prepared for Department of Energy (DOE) use for interim and long- range planning. In accordance with Richland DOE field office (DOE-RL) direction, year-end inventory values were not projected over an 11 year period, as historically done in previous MMP documents. This decision was made since significant SNM movements to or from Hanford are not projected in the foreseeable future. Instead, the inventory summaries within this document reflect an ``as of date`` of June 30, 1995.

  14. Information Resources Management Strategic Plan Appendix FY2014...

    Office of Environmental Management (EM)

    develop a governance model that provides a forum for discussing and adjudicating corporate requirements, policies, and standards. The resulting IT governance board will...

  15. Using Internet Mapping to Assist Natural Resource Planning & Management

    E-Print Network [OSTI]

    Houts, Michael

    2013-03-13T23:59:59.000Z

    GIS/Remote Sensing Specialist, KS Department of Wildlife & Parks, KS Applied Remote Sensing & KS Biological Survey...

  16. Rangeland Resource Management for Texans: Strategic Planning for Success (Spanish)

    E-Print Network [OSTI]

    Fox, William E.

    2004-12-22T23:59:59.000Z

    podr? relacionar con otras metas siempre y cuando no haya otras metas contradicto- rias. Y puede rastrearse porque las UA por a?o anuales se pueden medir cada a?o para ver si se est? cumpliendo la meta. Considerando el Ambiente Cuando haya establecido... brecha se puede cerrar, quiz?s por medio de expansi?n o diversificaci?n, el siguiente paso es desarrollar estrategias ade- cuadas para alcanzar las metas. Este es el nivel de planeaci?n en donde se toman las decisiones operativas diarias. No hay estrate...

  17. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  18. A Taxonomy and Survey of Grid Resource Management Systems Klaus Krauter1

    E-Print Network [OSTI]

    Buyya, Rajkumar

    1 A Taxonomy and Survey of Grid Resource Management Systems Klaus Krauter1 , Rajkumar Buyya2. In this paper, we develop a comprehensive taxonomy for describing resource management architectures. We use this taxonomy in identifying approaches followed in the implementation of real resource management systems

  19. Pottebaum et al. Event Definition for Intelligent Resource Management Event Definition for the Application of Event

    E-Print Network [OSTI]

    Paliouras, George

    of resource management (use case and demand side) and event processing (technology and supply side). MethodsPottebaum et al. Event Definition for Intelligent Resource Management Event Definition for the Application of Event Processing to Intelligent Resource Management Jens Pottebaum University of Paderborn, C

  20. Management of oil pollution of natural resources in Nigeria

    SciTech Connect (OSTI)

    Ikporukpo, C.O.

    1985-04-01T23:59:59.000Z

    Oil spillages are prominent features of petroleum exploitation in Nigeria. For instance, within the decade 1970-1980, the country experienced 18 major spills. Oil pollution adversely affects the water and soil resources of the petroleum-producing Niger Delta. There have been attempts to manage the increasing menace of oil spills, and two strategies may be identified. These are the legislative and the project implementation approaches. The first approach relies on preventative laws, while the second, more or less curative, depends on the implementation of projects for the monitoring, control, and clearance of spilled oil. There are various problems in the effective operation of both strategies, and the persistence of spills, many of them avoidable, tends to indicate lapses in the management attempts. 12 references, 4 tables.

  1. ENVIRONMENTAL PLANNING / NEPA SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS

    E-Print Network [OSTI]

    ENVIRONMENTAL PLANNING / NEPA SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML@cemml.colostate.edu | http://www.cemml.colostate.edu Effective environmental planning and management of military and testing. The Center develops environmental planning documents for installations to incorporate

  2. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01T23:59:59.000Z

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  3. Management and overview Quality Assurance Program Plan. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1986-08-01T23:59:59.000Z

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

  4. Appropriate Technologies and Systems to respond to Climate Change, Improved Water Resources Management, Waste Management and Sanitation

    E-Print Network [OSTI]

    Barthelat, Francois

    Resources Management, Waste Management and Sanitation A Review of Water Information Systems in the English availability, quality, use and demand. In this regard, Water Information Systems play a key role in the management of the resource. This paper examines the water information systems of St. Lucia, Jamaica

  5. Excess Uranium Inventory Management Plan 2008 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Departmentof1-SCORECARD-09-21-11AprilWednesday,Technology Laboratory

  6. SES Performance Management System Plan Training | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR -DepartmentRetailEnergySEA-04:SECURITYIndustryMarchPlan

  7. ADEQ Nonpoint Source State Management Plan | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1 WindtheEnergySulfonate as aAABWaste Handbook Jump to:Plan Jump

  8. EFCOG Integrated Safety Management Work Planning and Control | Department

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan Department ofNotices | Department of36CoolEERE Website Contact4of

  9. Utah Nonpoint Source Pollution Management Plan | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planning methodologies and tools |UC 54-2Full Proof ofUtah

  10. Utility Integrated Resource Planning: An Emerging Driver of NewRenewable Generation in the Western United States

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan

    2005-09-25T23:59:59.000Z

    In the United States, markets for renewable generation--especially wind power--have grown substantially in recent years. This growth is typically attributed to technology improvements and resulting cost reductions, the availability of federal tax incentives, and aggressive state policy efforts. But another less widely recognized driver of new renewable generation is poised to play a major role in the coming years: utility integrated resource planning (IRP). Common in the late-1980s to mid-1990s, but relegated to lesser importance as many states took steps to restructure their electricity markets in the late-1990s, IRP has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions such as the western United States, where retail competition has failed to take root. As practiced in the United States, IRP is a formal process by which utilities analyze the costs, benefits, and risks of all resources available to them--both supply- and demand-side--with the ultimate goal of identifying a portfolio of resources that meets their future needs at lowest cost and/or risk. Though the content of any specific utility IRP is unique, all are built on a common basic framework: (1) development of peak demand and load forecasts; (2) assessment of how these forecasts compare to existing and committed generation resources; (3) identification and characterization of various resource portfolios as candidates to fill a projected resource deficiency; (4) analysis of these different ''candidate'' resource portfolios under base-case and alternative future scenarios; and finally, (5) selection of a preferred portfolio, and creation of a near-term action plan to begin to move towards that portfolio. Renewable resources were once rarely considered seriously in utility IRP. In the western United States, however, the most recent resource plans call for a significant amount of new wind power capacity. These planned additions appear to be motivated by the improved economics of wind power, an emerging understanding that wind integration costs are manageable, and a growing acceptance of wind by electric utilities. Equally important, utility IRPs are increasingly recognizing the inherent risks in fossil-based generation portfolios--especially natural gas price risk and the financial risk of future carbon regulation--and the benefits of renewable energy in mitigating those risks. This article, which is based on a longer report from Berkeley Lab,i examines how twelve investor-owned utilities (IOUs) in the western United States--Avista, Idaho Power, NorthWestern Energy (NWE), Portland General Electric (PGE), Puget Sound Energy (PSE), PacifiCorp, Public Service Company of Colorado (PSCo), Nevada Power, Sierra Pacific, Pacific Gas & Electric (PG&E), Southern California Edison (SCE), and San Diego Gas & Electric (SDG&E)--treat renewable energy in their most recent resource plans (as of July 2005). In aggregate, these twelve utilities supply approximately half of all electricity demand in the western United States. In reviewing these plans, our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable generation in the United States, and (2) to suggest possible improvements to the methods used to evaluate renewable generation as a resource option. As such, we begin by summarizing the amount and types of new renewable generation planned as a result of these twelve IRPs. We then offer observations about the IRP process, and how it might be improved to more objectively evaluate renewable resources.

  11. Energy Efficiency in Western Utility Resource Plans Implications for

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of Year 2010 SNFEnergy Policy Act ofRegional Assessments and

  12. Impacts of Demand-Side Resources on Electric Transmission Planning |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To:Department ofOralGovernmentStandardsIdahoby4and Example |June 24,

  13. Alaska Department of Natural Resources Land Use Planning Webpage | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seiki G60Alameda County,90DEC Water

  14. Alaska Department of Natural Resources Land Use Plans | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seiki G60Alameda County,90DEC WaterInformation

  15. Colorado Division of Water Resources Substitute Water Supply Plans Webpage

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CERCollier Technologies IncCity,PublishedColorado| Open

  16. Quality Work Plan Checklist and Resources - Section 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+18, 2012 Qualified Energy Conservation BondEnergyQuality Quality

  17. Quality Work Plan Checklist and Resources - Section 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+18, 2012 Qualified Energy Conservation BondEnergyQuality Quality

  18. Quality Work Plan Checklist and Resources - Section 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+18, 2012 Qualified Energy Conservation BondEnergyQuality Quality

  19. Quality Work Plan Checklist and Resources - Section 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+18, 2012 Qualified Energy Conservation BondEnergyQuality Quality

  20. Project management plan for project W-320, tank 241-C-106 sluicing

    SciTech Connect (OSTI)

    Leliefeld, K.W.

    1996-02-02T23:59:59.000Z

    This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

  1. Transfer Guide: Forest Management -1 -Revised: 10 August 2012 TRANSFER GUIDE AND PLANNING WORKSHEET

    E-Print Network [OSTI]

    Transfer Guide: Forest Management - 1 - Revised: 10 August 2012 TRANSFER GUIDE AND PLANNING management concentration This planning worksheet represents a guide for community college students-Hrs Grade MAT 125 Survey of Calculus 4 #12;Transfer Guide: Forest Management - 2 - Revised: 10 August 2012

  2. Protection of Forest Resources (Montana)

    Broader source: Energy.gov [DOE]

    This statute addresses the conservation and protection of forest resources by encouraging the use of land management best practices pertaining to soil erosion, timber sale planning, associated road...

  3. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    SciTech Connect (OSTI)

    MCCARTHY, M.M.

    1999-08-01T23:59:59.000Z

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  4. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  5. Human Capital Management Plan Fiscal Years 2003- 2010

    SciTech Connect (OSTI)

    none,

    2000-03-09T23:59:59.000Z

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Westerns workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Westerns human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Westerns human capital needs. The team used the assessment to draft a framework that addresses the most critical human capital challenges in Western. Comments on the draft plan were then solicited from Westerns EEO committees and managers and supervisors. The framework outlines seven initiatives for implementation: 1) Develop a human capital plan linked to Westerns strategic goals. 2) Develop and implement a Westernwide workforce planning program. 3) Establish a succession planning program. 4) Create and foster a workplace environment that will attract and retain talented employees. 5) Establish a Western-wide recruitment program. 6) Develop a training program on human capital management for managers and supervisors. 7) Develop pay options for improving the link between pay and performance. Our goal in developing this plan is to help Western achieve its mission to be a premier power marketing and transmission organization. This plan serves as a first step in addressing Westerns human capital issues in the next decade.

  6. Graduate Assessment Strategies 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The

    E-Print Network [OSTI]

    Graduate Assessment Strategies Resources: 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The graduate level assessment plans from OSU may be particularly helpful: http://oregonstate.edu/admin/aa/apaa/assessment/graduate-assessment/graduate- assessment-plans 2. A list of best practices is online at http://inside.mines.edu/UserFiles/File/Assessment

  7. University of Oklahoma Office of Human Resources Sample Performance Evaluation and Development Planning Document For Monthly Staff

    E-Print Network [OSTI]

    Oklahoma, University of

    & Financial / Budget Management - Ability and extent to which the individual defines a project, gathers Planning Document For Monthly Staff For use with the administrative, professional, managerial, other monthly (exempt) staff. 1. The original Performance Evaluation and Development Planning Document

  8. Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan

    2005-08-10T23:59:59.000Z

    Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

  9. Rangeland Drought Management for Texans: Planning: The Key to Surviving Drought

    E-Print Network [OSTI]

    Hart, Charles R.; Carpenter, Bruce B.

    2001-05-02T23:59:59.000Z

    This publication outlines the steps that ranchers should take to survive a drought. Those steps include developing a plan for each enterprise of the operation, ranking strategic ranch goals, planning for resource flow, implementing and monitoring...

  10. Creating an urban deer-vehicle accident management plan using information from a town's GIS project

    E-Print Network [OSTI]

    Premo, Dean B.; Rogers, Elizabeth I.

    2001-01-01T23:59:59.000Z

    AN URBAN DEER-VEHICLE ACCIDENT MANAGEMENT PLAN USINGincrease in deer vehicle accidents. Given the Town'sof increased deer vehicle accidents which, in the past 10

  11. Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

    Broader source: Energy.gov [DOE]

    The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

  12. Office of Environmental Management Work Planning and Control Oversight |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM PolicyOf EnvironmentalGuide, July 29, 2009 |

  13. Mission Plan for the Civilian Radioactive Waste Management Program |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagement of the National 93-4Energy Minority-OwnedMinutes:Department

  14. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  15. An Implementation Plan for Integrated Control and Asset Management of Petroleum Production Facilities

    E-Print Network [OSTI]

    Taylor, James H.

    An Implementation Plan for Integrated Control and Asset Management of Petroleum Production management for the petroleum industry, which is very crucial for profitable oil and gas facilities operations, enhance safety, and improve product quality. Many research studies proposed different combinations

  16. Commercial and Industrial Base Intermittent Resource Management Pilot

    E-Print Network [OSTI]

    Kiliccote, Sila

    2011-01-01T23:59:59.000Z

    has been the dominant renewable resource in CaliforniasIntegration of Renewable Resources: Transmission andIntermittent renewable resources, variable generation,

  17. Managing natural resources for sustainable development. Special report

    SciTech Connect (OSTI)

    Chase, S.; Irving, E.; Long, N.; Pinkelman, J.

    1987-01-01T23:59:59.000Z

    The report presents an overview of A.I.D. efforts, which encompass a wide range of environmental issues and support environmental training, research, and institutional development. The report's opening section details A.I.D.'s efforts to enlist host-country support for environmental programs, with specific emphasis on improving natural resource management (especially in Africa), encouraging policy change, strengthening the private sector's environmental role, and preparing environmental profiles of host countries and helping them develop conservation strategies. The ensuing sections recount A.I.D. efforts in particular topics of environmental concern (biological diversity and environmental health and safety), critical ecological areas (coastal areas and forests and fragile lands), and specific country programs (reforestation in Haiti). A brief history of the evolution of the Agency's environmental strategy since 1976 is included.

  18. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01T23:59:59.000Z

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  19. 94-A13 Native American Initiative Short Course Management Plan

    SciTech Connect (OSTI)

    Carroll, Herbert B.; Johnson, William I.; Kokesh, Judith H.

    1999-04-27T23:59:59.000Z

    A training program conducted in Bartlesville by BDM-Oklahoma technical staff, which included geologists, geophysicists, exploration and drilling specialists, and environmental policy experts. The proposed training schedule offered four courses per year and included those coursed identified by the tribes in the survey. The training program was outlined for members of Native American Tribes whose lands have oil and gas resources. The proposed program contributed to meeting the goals of the U.S. Department of Energy's (DOE) Domestic Oil and Gas Initiative to help Native American tribes become more self-sufficient in developing and managing their resources through training in cost-effective, improved technologies for hydrocarbon production that will meet environmental regulations. The training program outlined was for adult tribal representatives who are responsible for managing tribal mineral holdings or setting policy, or who work in the oil and gas industry. The course content is in response to a survey that was developed by BDM-Oklahoma and sent in the Spring of 1995 to 26 tribal agencies identified through previous contact with DOE. Tribes were asked to indicate course content needs, levels, preferred time of year, and location. Six tribes responded with specific recommendations and needs. These tribes, were the Creek, Pueblo, Cherokee, St. Regis Mohawk, Northern Arapho, and Ute Mountain Ute.

  20. CloudPowerCap: Integrating Power Budget and Resource Management across a Virtualized Server Cluster

    E-Print Network [OSTI]

    Lu, Chenyang

    CloudPowerCap: Integrating Power Budget and Resource Management across a Virtualized Server Cluster not exceed the rack's provisioned power, it burdens the data center operator with managing the rack power for power cap management in a virtualized cluster. CloudPowerCap, closely integrated with a cloud resource