Natural Resource Management Plan Update  

E-Print Network [OSTI]

wood industry, some farming in area of Solar Farm 3 #12;History of Natural Resource Management Formal

Homes, Christopher C.

2

SNL/CA Cultural Resources Management Plan.  

SciTech Connect (OSTI)

The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

Larsen, Barbara L.

2005-11-01T23:59:59.000Z

3

Hanford cultural resources management plan  

SciTech Connect (OSTI)

As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

Chatters, J.C. (ed.)

1989-06-01T23:59:59.000Z

4

Nevada Test Site Resource Management Plan  

SciTech Connect (OSTI)

The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

NONE

1998-12-01T23:59:59.000Z

5

BSBA IN MANAGEMENT -HUMAN RESOURCE MANAGEMENT SPECIALIZATION ASSESSMENT PLAN  

E-Print Network [OSTI]

BSBA IN MANAGEMENT - HUMAN RESOURCE MANAGEMENT SPECIALIZATION ASSESSMENT PLAN (REV. 7 in Human Resource Management (HRM), the goal is to provide a foundation of all areas of human resources countries. · Content Delivered in: MGT 350, MGT 405, & MGT 357. · Assessment Method: Culminating exam

Gallo, Linda C.

6

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Julie Braun Williams

2013-02-01T23:59:59.000Z

7

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2011-02-01T23:59:59.000Z

8

Idaho National Laboratory Cultural Resource Management Plan  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices provides important details that support the main text.

Lowrey, Diana Lee

2009-02-01T23:59:59.000Z

9

Water Resource Planning and Management using Motivated Machine JANUSZ STARZYK  

E-Print Network [OSTI]

1 Water Resource Planning and Management using Motivated Machine Learning JANUSZ STARZYK School@ohio.edu Abstract Water resources planning and management require problem resolution and optimized use of resources. Since many objectives in water management are conflicting, it is hard to devise one optimum strategy

Starzyk, Janusz A.

10

BNL-100708-2013 Cultural Resource Management Plan  

E-Print Network [OSTI]

BNL-100708-2013 Cultural Resource Management Plan for Brookhaven National Laboratory May 2013 of this manuscript, or allow others to do so, for United States Government purposes. #12;Cultural Resource Management Cultural Resources CRC Cultural Resources Coordinator CRM Cultural Resource Management CRMP Cultural

11

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect (OSTI)

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

12

Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources  

E-Print Network [OSTI]

v.08.2011 Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources to nutrient management specialists. These resources serve two purposes: Education. These factsheets and publications are selected to supplement

Guiltinan, Mark

13

BLM - Approved Resource Management Plan Amendments/Record of...  

Open Energy Info (EERE)

Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference LibraryAdd to...

14

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

15

NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

GREEN,T.ET AL.

2003-12-31T23:59:59.000Z

16

CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

DAVIS, M.

2005-04-01T23:59:59.000Z

17

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

18

Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan  

SciTech Connect (OSTI)

A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

1992-06-01T23:59:59.000Z

19

Resource management plan for the Oak Ridge Reservation  

SciTech Connect (OSTI)

A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.

Parr, P.D. (Oak Ridge National Lab., TN (United States)); Evans, J.W. (Tennessee Wildlife Resources Agency, Knoxville, TN (United States))

1992-06-01T23:59:59.000Z

20

Environmental Guidelines for Development of Cultural Resource Management Plans--Update  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides guidelines for the development of an individual Cultural Resource Management Plan for each DOE facility and program. Canceled by DOE N 251.82.

2004-09-22T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

State Solid Waste Management and Resource Recovery Plan (Montana)  

Broader source: Energy.gov [DOE]

The State supports the "good management of solid waste and the conservation of natural resources through the promotion or development of systems to collect, separate, reclaim, recycle, and dispose...

22

Information Resources Management Strategic Plan Appendix FY2014-2018  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting Thomas F.Needs for Energy, 2008Plan

23

Information Resources Management Strategic Plan FY2014-2018  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting Thomas F.Needs for Energy,

24

Decision Analysis on Water Resources Planning and Management for an Arid Metropolitan Center in West Texas  

E-Print Network [OSTI]

TR- 54 1973 Decision Analysis on Water Recourses Planning and Management for an Arid Metropolitan Center in West Texas C.S. Shih J.H. Dean Texas Water Resources Institute Texas A...

Shih, C. S.; Dean, J. H.

25

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

26

North Slope Decision Support for Water Resource Planning and Management  

SciTech Connect (OSTI)

The objective of this project was to enhance the water resource decision-making process with respect to oil and gas exploration/production activities on Alaskas North Slope. To this end, a web-based software tool was developed to allow stakeholders to assemble, evaluate, and communicate relevant information between and amongst themselves. The software, termed North Slope Decision Support System (NSDSS), is a visually-referenced database that provides a platform for running complex natural system, planning, and optimization models. The NSDSS design was based upon community input garnered during a series of stakeholder workshops, and the end product software is freely available to all stakeholders via the project website. The tool now resides on servers hosted by the UAF Water and Environmental Research Center, and will remain accessible and free-of-charge for all interested stakeholders. The development of the tool fostered new advances in the area of data evaluation and decision support technologies, and the finished product is envisioned to enhance water resource planning activities on Alaskas North Slope.

Schnabel, William; Brumbelow, Kelly

2013-03-31T23:59:59.000Z

27

Towards an Integrated Planning and Adaptive Resource Management Architecture for Distributed Real-time Embedded Systems  

E-Print Network [OSTI]

conditions change. Key challenges in managing open DRE systems in- clude effective planning and online management of system resources to accommodate for changing mission goals, en- vironmental conditions- source management to control and ensure efficient function- ing of open DRE systems. 1 Introduction

Koutsoukos, Xenofon D.

28

Glenwood Springs Resource Management Plan (1984) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio: Energy Resources Jump to: navigation,Open EnergyAmendments Jump

29

Title 43 CFR 1610 Resource Management Planning | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-gTaguspark JumpDetective: Terminology and Index Jump to:Resource

30

Provides overall leadership for and management of the University's human resources strategy. Responsible for planning, organizing, directing, implementing, and administering human resources strategy, policies and  

E-Print Network [OSTI]

Provides overall leadership for and management of the University's human resources strategy. Responsible for planning, organizing, directing, implementing, and administering human resources strategy resource matters; collaborates with senior leaders to build a performance based culture that emphasizes

Dasgupta, Dipankar

31

India-Natural Resource Management Plan | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: Eden Prairie, Minnesota Zip: 55344

32

Recommended Academic Plan for the Environmental Resource Management -Soil Science Option (E R M/SOIL)  

E-Print Network [OSTI]

Recommended Academic Plan for the Environmental Resource Management - Soil Science Option (E R M/SOIL of Calculus I or MATH 140* (GQ) Calculus With Analytic Geometry I 4 SOILS 101 (GN) Introductory Soil Science 3 AG 150S (First-Year Seminar) Be a Master Student! 2 SOILS 102 Introductory Soil Science Laboratory 1

Omiecinski, Curtis

33

CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME | NationalTbilisi08 to17 2.7

34

CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICEACME | NationalTbilisi08 to17 2.7 i R y R y

35

DOD Instruction 4715.03 - Integrated Natural Resources Management Plan  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003)CrowleyEnergyMasse) Jump to:DEXAScreening Tool Jump(INRMP)

36

Rangeland Resource Management for Texans: Strategic Planning for Success  

E-Print Network [OSTI]

are. The mission should neither limit nor overextend the enterprise. It should be as broad as possible without being unrealistic. Setting Goals Once you have defined your mission you can set goals for fulfilling that mission. The best goals are SMART... attainable? How would you measure success or track progress toward such goals? An example of a SMART goal might be: ?To sustain the resource so that it maintains a 1,200 AU per year productiv- ity over my lifetime.? It is specific. It is measurable over...

Fox, William E.

2002-03-04T23:59:59.000Z

37

Local government involvement in long term resource planning for community energy systems. Demand side management  

SciTech Connect (OSTI)

A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

Not Available

1992-03-01T23:59:59.000Z

38

Identification of Management and Planning Problems of Urban Water Resources in the Metropolitan Area of Greater San Antonio  

E-Print Network [OSTI]

including the inventory and planning control for both surface and ground Water Resource Management of the San Antonio area are presented. Emphasis has been placed upon the identification of the probabilistic nature of various decision-making parameters...

Garner, K.; Shih, C. S.

39

OFFICE OF RESOURCE PLANNING OPERATING BUDGET UNIT  

E-Print Network [OSTI]

OFFICE OF RESOURCE PLANNING Manager Sarah Teo OPERATING BUDGET UNIT Deputy Director (Operating, Strategic Initiatives & Consolidated Budgets) Tay Sok Kian Senior Director Ajith Prasad Senior Associate Initiatives & Research Budgets: (Planning & Budget Management) Revenue Policies & Planning: (Grants

Leng, Chenlei

40

Business Planning Resources  

Broader source: Energy.gov [DOE]

Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Information resources management long-range plan, FY1994--1998  

SciTech Connect (OSTI)

This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

Not Available

1993-04-01T23:59:59.000Z

42

Managing Carbon Regulatory Risk in Utility Resource Planning:Current Practices in the Western United States  

SciTech Connect (OSTI)

Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. Assuch, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-05-16T23:59:59.000Z

43

Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States  

SciTech Connect (OSTI)

Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demand-side resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers who are seeking to minimize the compliance costs associated with future carbon regulations.

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-07-11T23:59:59.000Z

44

Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields in New Mexico and Wyoming  

SciTech Connect (OSTI)

In 2002, Gnomon, Inc., entered into a cooperative agreement with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) for a project entitled, Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields in New Mexico and Wyoming (DE-FC26-02NT15445). This project, funded through DOEs Preferred Upstream Management Practices grant program, examined cultural resource management practices in two major oil- and gas-producing areas, southeastern New Mexico and the Powder River Basin of Wyoming (Figure 1). The purpose of this project was to examine how cultural resources have been investigated and managed and to identify more effective management practices. The project also was designed to build information technology and modeling tools to meet both current and future management needs. The goals of the project were described in the original proposal as follows: Goal 1. Create seamless information systems for the project areas. Goal 2. Examine what we have learned from archaeological work in the southeastern New Mexico oil fields and whether there are better ways to gain additional knowledge more rapidly or at a lower cost. Goal 3. Provide useful sensitivity models for planning, management, and as guidelines for field investigations. Goal 4. Integrate management, investigation, and decision- making in a real-time electronic system. Gnomon, Inc., in partnership with the Wyoming State Historic Preservation Office (WYSHPO) and Western GeoArch Research, carried out the Wyoming portion of the project. SRI Foundation, in partnership with the New Mexico Historic Preservation Division (NMHPD), Statistical Research, Inc., and Red Rock Geological Enterprises, completed the New Mexico component of the project. Both the New Mexico and Wyoming summaries concluded with recommendations how cultural resource management (CRM) processes might be modified based on the findings of this research.

Eckerle, William; Hall, Stephen

2005-12-30T23:59:59.000Z

45

ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING  

SciTech Connect (OSTI)

This report summarizes activities that have taken place in the last six (6) months (January 2005-June 2005) under the DOE-NETL cooperative agreement ''Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields, New Mexico and Wyoming'' DE-FC26-02NT15445. This project examines the practices and results of cultural resource investigation and management in two different oil and gas producing areas of the United States: southeastern New Mexico and the Powder River Basin of Wyoming. The project evaluates how cultural resource investigations have been conducted in the past and considers how investigation and management could be pursued differently in the future. The study relies upon full database population for cultural resource inventories and resources and geomorphological studies. These are the basis for analysis of cultural resource occurrence, strategies for finding and evaluating cultural resources, and recommendations for future management practices. Activities can be summarized as occurring in either Wyoming or New Mexico. Gnomon as project lead, worked in both areas.

Peggy Robinson

2005-07-01T23:59:59.000Z

46

Information Resources Security Planning and Policy Committee -UTDPP1003  

E-Print Network [OSTI]

Information Resources Security Planning and Policy Committee - UTDPP1003 Policy Charge IR Security Planning and Policy Committee Policy Statement The Information Resources Planning, and Policy a security plan to protect information identified as confidential, sensitive or both. 3. Assign management

O'Toole, Alice J.

47

ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING  

SciTech Connect (OSTI)

This report contains a summary of activities of Gnomon, Inc. and five subcontractors that have taken place during the first six months of 2004 (January 1, 2004-June 30, 2004) under the DOE-NETL cooperative agreement: ''Adaptive Management and Planning Models for Cultural Resources in Oil & Gas Fields in New Mexico and Wyoming'', DE-FC26-02NT15445. Although Gnomon and all five subcontractors completed tasks during these six months, most of the technical experimental work was conducted by the subcontractor, SRI Foundation (SRIF). SRIF created a sensitivity model for the Azotea Mesa area of southeastern New Mexico that rates areas as having a very good chance, a good chance, or a very poor chance of containing cultural resource sites. SRIF suggested that the results of the sensitivity model might influence possible changes in cultural resource management (CRM) practices in the Azote Mesa area of southeastern New Mexico.

Peggy Robinson

2004-07-01T23:59:59.000Z

48

ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL & GAS FIELDS IN NEW MEXICO AND WYOMING  

SciTech Connect (OSTI)

This report contains a summary of activities of Gnomon, Inc. and five subcontractors that have taken place during the second six months (July 1, 2003-December 31, 2003) under the DOE-NETL cooperative agreement: ''Adaptive Management and Planning Models for Cultural Resources in Oil & Gas Fields in New Mexico and Wyoming'', DE-FC26-02NT15445. Although Gnomon and all five subcontractors completed tasks during these six months, most of the technical experimental work was conducted by the subcontractor, SRI Foundation (SRIF). SRIF created a sensitivity model for the Loco Hills area of southeastern New Mexico that rates areas as having a very good chance, a good chance, or a very poor chance of containing cultural resource sites. SRIF suggested that the results of the sensitivity model might influence possible changes in cultural resource management (CRM) practices in the Loco Hills area of southeastern New Mexico.

Peggy Robinson

2004-01-01T23:59:59.000Z

49

An approach to understanding, representing, and managing uncertainty in integrated resource planning  

SciTech Connect (OSTI)

This report addresses the issue of uncertainty in integrated resource planning (IRP). IRP is a process employed by electric utilities, often at the bellest of Public Utility Commissions (PUCs), to evaluate the acquisition of resources to meet forecast energy demands and other criteria such as energy efficiency and fuel diversity. Uncertainty plagues the preparation of IRPs, from forecasting energy prices and electricity demand to estimating costs and benefits expected from new resource acquisitions. As a result all those involved in the IRP process (including PUC commissioners and staff, utility decision makers, IRP analysts, and experts in particular areas) need to appreciate how uncertainty affects IRP and learn about available techniques to reduce its effects.

Tonn, B.E. [Oak Ridge National Lab., TN (United States); Schaffhauser, A.J. [Tennessee Univ., Knoxville, TN (United States)

1994-12-01T23:59:59.000Z

50

Primer on gas integrated resource planning  

SciTech Connect (OSTI)

This report discusses the following topics: gas resource planning: need for IRP; gas integrated resource planning: methods and models; supply and capacity planning for gas utilities; methods for estimating gas avoided costs; economic analysis of gas utility DSM programs: benefit-cost tests; gas DSM technologies and programs; end-use fuel substitution; and financial aspects of gas demand-side management programs.

Goldman, C.; Comnes, G.A.; Busch, J.; Wiel, S. [Lawrence Berkeley Lab., CA (United States)

1993-12-01T23:59:59.000Z

51

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

52

What is a business plan? A business plan is a tool used to organize a business idea, resources, management and clients. The tool is meant to plan  

E-Print Network [OSTI]

at by investors very carefully. It should detail costs, expenses, capital, break-even analysis, estimated cash1 What is a business plan? A business plan is a tool used to organize a business idea, resources do you get the product to your client(s)? What are the costs to make the product? What should

Johnson, Eric E.

53

LANDS WITH WILDERNESS CHARACTERISTICS, RESOURCE MANAGEMENT PLAN CONSTRAINTS, AND LAND EXCHANGES: CROSS-JURISDICTIONAL MANAGEMENT AND IMPACTS ON UNCONVENTIONAL FUEL DEVELOPMENT IN UTAHS UINTA BASIN  

SciTech Connect (OSTI)

Utah is rich in oil shale and oil sands resources. Chief among the challenges facing prospective unconventional fuel developers is the ability to access these resources. Access is heavily dependent upon land ownership and applicable management requirements. Understanding constraints on resource access and the prospect of consolidating resource holdings across a fragmented management landscape is critical to understanding the role Utahs unconventional fuel resources may play in our nations energy policy. This Topical Report explains the historic roots of the crazy quilt of western land ownership, how current controversies over management of federal public land with wilderness character could impact access to unconventional fuels resources, and how land exchanges could improve management efficiency. Upon admission to the Union, the State of Utah received the right to title to more than one-ninth of all land within the newly formed state. This land is held in trust to support public schools and institutions, and is managed to generate revenue for trust beneficiaries. State trust lands are scattered across the state in mostly discontinuous 640-acre parcels, many of which are surrounded by federal land and too small to develop on their own. Where state trust lands are developable but surrounded by federal land, federal land management objectives can complicate state trust land development. The difficulty generating revenue from state trust lands can frustrate state and local government officials as well as citizens advocating for economic development. Likewise, the prospect of industrial development of inholdings within prized conservation landscapes creates management challenges for federal agencies. One major tension involves whether certain federal public lands possess wilderness character, and if so, whether management of those lands should emphasize wilderness values over other uses. On December 22, 2010, Secretary of the Interior Ken Salazar issued Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Orders implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 are unlikely to profoundly impact oil shale development within Utahs Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those resources found in the southern part of the state. Management requirements independent of l

Keiter, Robert; Ruple, John; Holt, Rebecca; Tanana, Heather; McNeally, Phoebe; Tribby, Clavin

2012-10-01T23:59:59.000Z

54

Resource assessment/commercialization planning meeting  

SciTech Connect (OSTI)

The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

None

1980-01-24T23:59:59.000Z

55

Project Management Plan Resident Management System (RMS)  

E-Print Network [OSTI]

1 Project Management Plan Resident Management System (RMS) And Quality Control System (QCS Resident Management System.........................................................................................................3 Project Management Plan - Purpose

US Army Corps of Engineers

56

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

Revision 6 Waste Management Quality Assurance Plan Waste6 WM QA Plan Waste Management Quality Assurance Plan LBNL/4 Management Quality Assurance

Waste Management Group

2006-01-01T23:59:59.000Z

57

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

58

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN  

E-Print Network [OSTI]

BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PL LDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A R RISK MANAGEMENT PLAN BUILDING A RISK MANAGEMENT PLAN BUILDIN T PLAN BUILDING A RISK MANAGEMENT PLAN BUILDING A RISK MANAGEM

Florida, University of

59

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

E-Print Network [OSTI]

Table 4. Table 5. Table 6. Utility Resource Plans Included2 Carbon Emission Price Projections in Utility11 Utility Approaches to Incorporating Energy Efficiency

Barbose, Galen

2008-01-01T23:59:59.000Z

60

Environmental Management System Plan  

SciTech Connect (OSTI)

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environm

Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

2009-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Operating System Resource Management  

E-Print Network [OSTI]

Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location constrained. This talk will propose a scheme for addressing the operating system resource management problem Sciences Seminar Series presents Pacific Northwest National Laboratory Resource management is the dynamic

62

194 / JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT / JULY/AUGUST 1999 INDICATORS OF IMPACTS OF GLOBAL CLIMATE CHANGE ON U.S.  

E-Print Network [OSTI]

194 / JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT / JULY/AUGUST 1999 INDICATORS OF IMPACTS of the indicators, regional reservoir storage vulnerability, is a particularly useful index summarizing (U.S.) to investigate the integrated impacts of potential global warming on water resources. Impacts

Vogel, Richard M.

63

Best Management Practice #1: Water Management Planning  

Broader source: Energy.gov [DOE]

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

64

Forest Resources and Management  

E-Print Network [OSTI]

a sustainable bio-energy industry. Timber is an ideal construction material. Centre for Forest ResourcesForest Resources and Management Centre for The Centre for Forest Resources and Management aims the forest resource. Our aim is that British forests ­ from their creation to maturity and regeneration

65

EEO Management Plan 20072010 September 2007 1  

E-Print Network [OSTI]

EEO Management Plan 2007­2010 September 2007 1 EEO Management Plan 2007-2010 Part 9A of the Anti-Discrimination Act (1977) and the Equal Opportunity for Women in the Workplace Act 1999, the EEO Management Plan awarded annually by EOWA) CDPS Cultural Diversity Priorities Statement HRS Human Resource Services ODU

Dunstan, Neil

66

Energy planning and management plan  

SciTech Connect (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

67

CULTURAL RESOURCES SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS  

E-Print Network [OSTI]

CULTURAL RESOURCES SERVICES CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS CEMML | 1490) provides assistance to military land managers for technical support in cultural resources management planning and compliance. The goal is to ensure that these diverse, nonrenewable resources are adequately

68

Environmental Resource Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Resource Management This division delivers science-based engineering solutions to meet regional and national energy, water and other critical environmental...

69

ADAPTIVE MANAGEMENT AND PLANNING MODELS FOR CULTURAL RESOURCES IN OIL AND GAS IN NEW MEXICO AND WYOMING  

SciTech Connect (OSTI)

This report contains a summary of activities of Gnomon, Inc. and five sub-contractors that have taken place during the first six months (January 1, 2003--June 30, 2003) under the DOE-NETL cooperative agreement: ''Adaptive Management and Planning Models for Cultural Resources in Oil & Gas Fields in New Mexico and Wyoming'', DE-FC26-02NT15445. Gnomon, Inc. and all five (5) subcontractors have agreed on a process for the framework of this two-year project. They have also started gathering geomorphological information and entering cultural resource data into databases that will be used to create models later in the project. This data is being gathered in both the Power River Basin of Wyoming, and the Southeastern region of New Mexico. Several meetings were held with key players in this project to explain the purpose of the research, to obtain feedback and to gain support. All activities have been accomplished on time and within budget with no major setbacks.

Peggy Robinson

2003-07-25T23:59:59.000Z

70

Integrated Resource Planning: A Dialogue with ELCON  

E-Print Network [OSTI]

the building of generating units. Planning decisions would now include alternative energy sources 2 and demand side management. Also very important in the IRP process is the evaluation of external impacts of any planning decision with a special focus... and demand resources in electricity markets. In this paper we provide a definition of that concept and discuss two of its main features: Demand-side Management programs and environmental externalities. We also examine a number of positions taken by ELCON...

Treadway, N.; Torrent, G.

71

Community Energy Strategic Planning Resources  

Broader source: Energy.gov [DOE]

Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

72

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

73

Proposed Resource Management Plan/Final Environmental Impact Statement for the Ely District  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronicNORTH LAS VEGASEly District Record of

74

BLM - Approved Resource Management Plan Amendments/Record of Decision for  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 EastMaine: EnergyAustin Energy Place: TexasAvoyellesdeA SBIOPARSolar Energy

75

Groundwater protection management program plan  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

76

Public involvement in integrated resource planning: A study of demand-side management collaboratives  

SciTech Connect (OSTI)

Many utilities and nonutility parties (NUPs) across the country have tried a new approach to reaching agreement on Demand-Side Management (DSM) program design and policy issues. Through this, which is called the DSM collaborative process, parties who have often been adversaries in the past attempt to reach consensus rather than using traditional litigation to resolve differences. We examined nine cases of DSM collaboration involving 24 utilities and approximately 50 NUPs in 10 states. This is the first comprehensive, in-depth review and assessment of collaboratives and it allows conclusions to be drawn about the collaborative process and the factors that contribute to successful efforts of this type. Collaboratives are described in terms of four major contextual and organizational characteristics: regulatory and legal history, parties involved and parties excluded, collaborative scope, and the collaborative process itself.

Raab, J. [Raab (J.), Boston, MA (United States); Schweitzer, M. [Oak Ridge National Lab., TN (United States)

1992-02-01T23:59:59.000Z

77

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

78

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

SciTech Connect (OSTI)

The long economic lifetime and development lead-time of many electric infrastructure investments requires that utility resource planning consider potential costs and risks over a lengthy time horizon. One long-term -- and potentially far-reaching -- risk currently facing the electricity industry is the uncertain cost of future carbon dioxide (CO2) regulations. Recognizing the importance of this issue, many utilities (sometimes spurred by state regulatory requirements) are beginning to actively assess carbon regulatory risk within their resource planning processes, and to evaluate options for mitigating that risk. However, given the relatively recent emergence of this issue and the rapidly changing political landscape, methods and assumptions used to analyze carbon regulatory risk, and the impact of this analysis on the selection of a preferred resource portfolio, vary considerably across utilities. In this study, we examine the treatment of carbon regulatory risk in utility resource planning, through a comparison of the most-recent resource plans filed by fifteen investor-owned and publicly-owned utilities in the Western U.S. Together, these utilities account for approximately 60percent of retail electricity sales in the West, and cover nine of eleven Western states. This report has two related elements. First, we compare and assess utilities' approaches to addressing key analytical issues that arise when considering the risk of future carbon regulations. Second, we summarize the composition and carbon intensity of the preferred resource portfolios selected by these fifteen utilities and compare them to potential CO2 emission benchmark levels.

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-02-01T23:59:59.000Z

79

Resource management plan for the Oak Ridge Reservation. Volume 29, Rare plants on the Oak Ridge Reservation  

SciTech Connect (OSTI)

Rare plant species listed by state or federal agencies and found on or near the Department of Energy`s Oak Ridge Reservation (ORR) are identified. Seventeen species present on the ORR are listed by the Tennessee Department of Environment and Conservation as either endangered, threatened, or of special concern. Four of these are under review by the US Fish and Wildlife Service for possible listing as threatened or endangered species. Ten species listed by the state occur near and may be present on the ORR; four are endangered in Tennessee, and one is a candidate for federal listing. A range of habitats supports the rare taxa on the ORR: River bluffs, calcareous barrens, wetlands, and deciduous forest. Sites for listed rare species on the ORR have been designated as Research Park Natural Areas. Consideration of rare plant habitats is an important component of resource management and land-use planning; protection of rare species in their natural habitat is the best method of ensuring their long-term survival. In addition, the National Environmental Policy Act requires that federally funded projects avoid or mitigate impacts to listed species. The list of rare plant species and their location on the ORR should be considered provisional because the entire ORR has not been surveyed, and state and federal status of all species continues to be updated.

Cunningham, M. [Science Applications International Corp., Oak Ridge, TN (United States); Pounds, L. [Tennessee Univ., Knoxville, TN (United States); Oberholster, S. [USDA Forest Service, Montgomery, AL (United States); Parr, P.; Mann, L. [Oak Ridge National Lab., TN (United States); Edwards, L. [Clemson Univ., SC (United States). Dept. of Forestry; Rosensteel, B. [JAYCOR Environmental, Vienna, VA (United States)

1993-08-01T23:59:59.000Z

80

FORMALDEHYDE Formaldehyde Management Plan i  

E-Print Network [OSTI]

and Evaluation) Facilities Management Work Control Center (40)5-2222 (Repair of Facility Equipment DeficienciesFORMALDEHYDE MANAGEMENT PLAN #12;Formaldehyde Management Plan i Review and Approval Authority Formaldehyde Management Plan this page intentionally blank #12;Formaldehyde Management Plan iii Table

Rubloff, Gary W.

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Evolution and Evaluation of the Active Management Area Management Plans  

E-Print Network [OSTI]

on Management Plan Information 29 Municipal 29 Agricultural 30 Industrial 31 Water Budgets 32 Other Summary 46 Appendix C: Tucson AMA 2006 Water Budget 48 Appendix D: Groundwater Management Plan Legislative of the Arizona Groundwater Management Act (GMA), the Arizona Department of Water Resources (ADWR

Fay, Noah

82

Human Resource Management Delegation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The notice is to clarifies and updates existing Human Resource Management Delegation Authorities and the levels to which they are delegated. Expired 6-28-97. Does not cancel any directives.

1996-06-28T23:59:59.000Z

83

Production System Planning for Natural Resource Conservation in a Micro-Watershed  

E-Print Network [OSTI]

Production System Planning for Natural Resource Conservationa case study watershed. Production Systems Planning (PSP) isWatershed Management, Production Systems Planning (PSP)

Ramakrishna, Nallathiga

2003-01-01T23:59:59.000Z

84

Management Plan Supplement Yakima Subbasin Plan  

E-Print Network [OSTI]

#12;Management Plan Supplement Yakima Subbasin Plan November 26, 2004 Prepared for the Presented's subbasin planning process is iterative and designed within an adaptive management framework. Management is comprised of elected officials from local governments throughout the subbasin, and meets regularly to work

85

Performance Management Plan  

SciTech Connect (OSTI)

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

86

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

1996-09-30T23:59:59.000Z

87

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

88

John Day Subbasin Revised Draft Plan March 15, 2005 5. Management Plan  

E-Print Network [OSTI]

John Day Subbasin Revised Draft Plan March 15, 2005 224 5. Management Plan The Management Plan land managers, makes efficient use of resources and respects property rights. The result will be sustainable, resource-based activities that contribute to the social, cultural and economic well

89

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

90

Energy Management and Conservation Plan  

E-Print Network [OSTI]

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

91

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

E-Print Network [OSTI]

energy efficiency and renewable resources, which serves onewith New Renewable Resources 18Portfolios with New Renewable Resources No. of Candidate

Barbose, Galen

2008-01-01T23:59:59.000Z

92

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

E-Print Network [OSTI]

with New Renewable Resources 18Portfolios with New Renewable Resources No. of Candidateportfolios with new renewable resources comprising, at most,

Barbose, Galen

2008-01-01T23:59:59.000Z

93

Performance Demonstration Program Management Plan  

SciTech Connect (OSTI)

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organizations quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

94

Module title Human Resource Management Module code INT3604  

E-Print Network [OSTI]

working and the positive management of conflict and cultural difference Syllabus plan Syllabus planModule title Human Resource Management Module code INT3604 Academic year(s) 2013/4 Credits 15 Basic in the context of human resource management principles and practice as currently applied within organisations

Mumby, Peter J.

95

Information Resources Security Planning and Policy Committee -UTDPP1003  

E-Print Network [OSTI]

Information Resources Security Planning and Policy Committee - UTDPP1003 Policy Charge IR Security it is confidential, sensitive, both or neither. 2. Prepare a security plan to protect information identified as confidential, sensitive or both. 3. Assign management responsibility for implementing the security plan. 4

O'Toole, Alice J.

96

Massachusetts Ocean Management Plan (Massachusetts)  

Broader source: Energy.gov [DOE]

The Massachusetts Ocean Act of 2008 required the states Secretary of Energy and Environmental Affairs to develop a comprehensive ocean management plan for the state by the end of 2009. That plan...

97

Waste Isolation Pilot Plant, Land Management Plan  

SciTech Connect (OSTI)

To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

Not Available

1993-12-01T23:59:59.000Z

98

Project Management Plan  

SciTech Connect (OSTI)

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

99

Rangeland Resource Management for Texans: Total Resource Management  

E-Print Network [OSTI]

The Total Resource Management approach helps ranchers make strategic, tactical and operational decisions for the best, most cost-effective use of resources. This publication offers step-by-step directions for implementing TRM for a profitable...

Hanselka, C. Wayne; Fox, William E.; White, Larry D.

2004-03-26T23:59:59.000Z

100

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

E-Print Network [OSTI]

Plan Needs Geothermal Small Hydro or Upgrade Biomass Windwith geothermal, and four with small hydro or upgrades toexpiring geothermal, small hydro, and biomass contracts).

Barbose, Galen

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Project Management Plan Solution Stabilization  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

SATO, P.K.

1999-08-31T23:59:59.000Z

102

UNC Charlotte Government Property Management Plan 1 Government Property Management Plan  

E-Print Network [OSTI]

. MANAGEMENT AND ACQUISITION Under the University's property management system, the Materials ManagementUNC Charlotte Government Property Management Plan 1 Government Property Management Plan Initially approved: 21 October 2011 Updated: August 24, 2012 SCOPE This Government Property Management Plan applies

Howitt, Ivan

103

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

1996-09-30T23:59:59.000Z

104

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

1996-09-30T23:59:59.000Z

105

Environmental Management System Plan  

E-Print Network [OSTI]

Management Program, R-3 Environmental Management SystemEnvironmental policy 3. Environmental aspects 4. Legal andObjectives, targets, and Environmental Management Programs

Fox, Robert

2009-01-01T23:59:59.000Z

106

Information resource management concepts for records managers  

SciTech Connect (OSTI)

Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management`s goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

Seesing, P.R.

1992-10-01T23:59:59.000Z

107

Waste Management Program management plan. Revision 1  

SciTech Connect (OSTI)

As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

NONE

1997-02-01T23:59:59.000Z

108

Information resource management concepts for records managers  

SciTech Connect (OSTI)

Information Resource Management (ERM) is the label given to the various approaches used to foster greater accountability for the use of computing resources. It is a corporate philosophy that treats information as it would its other resources. There is a reorientation from simply expenditures to considering the value of the data stored on that hardware. Accountability for computing resources is expanding beyond just the data processing (DP) or management information systems (MIS) manager to include senior organization management and user management. Management's goal for office automation is being refocused from saving money to improving productivity. A model developed by Richard Nolan (1982) illustrates the basic evolution of computer use in organizations. Computer Era: (1) Initiation (computer acquisition), (2) Contagion (intense system development), (3) Control (proliferation of management controls). Data Resource Era: (4) Integration (user service orientation), (5) Data Administration (corporate value of information), (6) Maturity (strategic approach to information technology). The first three stages mark the growth of traditional data processing and management information systems departments. The development of the IRM philosophy in an organization involves the restructuring of the DP organization and new management techniques. The three stages of the Data Resource Era represent the evolution of IRM. This paper examines each of them in greater detail.

Seesing, P.R.

1992-10-01T23:59:59.000Z

109

Supply-side Resources & Planning Assumptions  

E-Print Network [OSTI]

- station Solar PV (from 6th Plan) 25 MW dc/20 MW net ac output using flat plate non concentrating single) Storage Resource assessment data needs and applications R d f t Resources proposed for assessment Forecasts ProCost 46/19/2013 #12;6/19/2013 3 Resource data & planning assumptions Reference plant (New

110

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

E-Print Network [OSTI]

carbon intensity of utilities preferred resource portfolios to EIAs projectionscarbon intensity of the utilities preferred portfolios and EIAs projectioncarbon intensity of the set of utility preferred portfolios and EIAs projections

Barbose, Galen

2008-01-01T23:59:59.000Z

111

8 Management Plan 8.1.1 Introduction  

E-Print Network [OSTI]

management and use of natural resources including reliable water supplies, fish and wildlife populations145 8 Management Plan 8.1.1 Introduction The information below will be used by subbasin planners that will aid in the recovery of focal species. The management plan is made up of five components: the vision

112

Ground water protection management program plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

113

Resources for Fleet Managers  

Broader source: Energy.gov [DOE]

Fleet managers will benefit from the lower fuel costs, more reliable fuel prices, and lower emissions that come from using alternative fuels and advanced technologies made possible through the work...

114

Material Stabilization Project Management Plan  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

SPEER, D.R.

1999-09-01T23:59:59.000Z

115

Environmental Management System Plan  

E-Print Network [OSTI]

management Water conservation LBNLs approach to sustainable environmentalWater Discharges) of Introduction Environmental Managementenvironmental compliance programs, such as air and water quality, as well as less traditional programs, such as wildland fire management,

Fox, Robert

2009-01-01T23:59:59.000Z

116

Planning and Managing Pesticide Stores  

E-Print Network [OSTI]

1 Planning and Managing Pesticide Stores 231 Corstorphine Road Edinburgh EH12 7AT www not provide a specific training course on pesticide stores, basic store criteria and management are described. The forest industry must be able to demonstrate to regulators such as the Health and Safety Executive (HSE

117

Underground storage tank management plan  

SciTech Connect (OSTI)

The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

NONE

1994-09-01T23:59:59.000Z

118

Environmental Management System Plan  

E-Print Network [OSTI]

Water Discharges) of Introduction Environmental Managementmanagement Water conservation LBNLs approach to sustainable environmentalEnvironmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: Protect the air, water,

Fox, Robert

2009-01-01T23:59:59.000Z

119

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

DIVISION Waste Management Quality Assurance ImplementingI I IMPLEMENTING MANAGEMENT QUALITY PLAN ASSURANCE I lilillI WM-QAIMP Waste Management Quality Assurance Implementing

Albert editor, R.

2009-01-01T23:59:59.000Z

120

Solid Waste Management Program Plan  

SciTech Connect (OSTI)

The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

Duncan, D.R.

1990-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan  

SciTech Connect (OSTI)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ``Characterization of Hazardous Waste Sites`` has been liberally adapted for use in this RFI Program Plan.

Not Available

1989-06-30T23:59:59.000Z

122

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

1996-09-29T23:59:59.000Z

123

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

1996-09-30T23:59:59.000Z

124

State Lands Management Plan Rosemary Hill Observatory  

E-Print Network [OSTI]

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

125

Demil planning and management system  

SciTech Connect (OSTI)

The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C. [Argonne National Lab., IL (United States); Golden, R.E. [Army Pacific, Fort Shafter, HI (United States); Fuller, R. [Army Industrial Operations Command, Rock Island, IL (United States). National Maintenance Point Branch

1997-08-01T23:59:59.000Z

126

Contract Management Plan Outline  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContacts

127

NNSA Releases Annual Stockpile Stewardship & Management Plan...  

National Nuclear Security Administration (NNSA)

Plan NNSA Releases Annual Stockpile Stewardship & Management Plan Press Release Mar 19, 2015 Annual Report Provides Insight into Vital National Security Programs WASHINGTON, DC -...

128

A reservoir management plan  

SciTech Connect (OSTI)

There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

Allis, R.G.

1989-06-16T23:59:59.000Z

129

Energy Emergency Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the administrative and operational framework of the Energy Emergency Management System (EEMS), and to establish the general criteria for the development and coordination of the Department's energy emergency planning activities. Cancels DOE 5500.8. Canceled by DOE O 151.1 of 9-25-95.

1992-07-08T23:59:59.000Z

130

Digital Data Management Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesData FilesShape,Physics DiagnosticsMicrochips.inDigging

131

PRC Contract Management Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven Ashby Dr. Steven AshbystationAbout UsBOE Reserve88952

132

National conference on integrated resource planning: Proceedings  

SciTech Connect (OSTI)

Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

Not Available

1991-01-01T23:59:59.000Z

133

National conference on integrated resource planning: Proceedings  

SciTech Connect (OSTI)

Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

Not Available

1991-12-31T23:59:59.000Z

134

Environmental Planning and Resource Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing Zirconia

135

Workforce Management Office WORKFORCE AND SUCCESSION PLANNING  

E-Print Network [OSTI]

2012 Workforce Management Office NOAA 1/1/2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps #12;Workforce & Succession Planning Toolkit NOAA Workforce .......................................................................................................3 Workforce Planning

136

Configuration Management Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration...

137

Optimization Online - Operations Risk Management by Planning ...  

E-Print Network [OSTI]

Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragni re(Emmanuel.Fragniere ***at***...

Emmanuel Fragni re

2007-08-01T23:59:59.000Z

138

Solid Waste Management Plan. Revision 4  

SciTech Connect (OSTI)

The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

NONE

1995-04-26T23:59:59.000Z

139

Waste Management Quality Assurance Plan  

SciTech Connect (OSTI)

The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

Waste Management Group

2006-08-14T23:59:59.000Z

140

Los Alamos National Laboratory compliance with cultural resource management legislation  

SciTech Connect (OSTI)

Cultural resources management is one aspect of NEPA-induced legislation increasingly affecting federal land managers. A number of regulations, some of them recent, outline management criteria for protecting cultural resources on federal land. Nearly all construction projects at the 11,135 hectare Los Alamos National Laboratory in northern New Mexico are affected by cultural resource management requirements. A substantial prehistoric Puebloan population occupied the Laboratory area from the 13th to the early 16th centuries. Grazing, timbering, and homesteading followed Indian occupation. Therefore, archaeological and historical ruins and artifacts are abundant. The Laboratory has developed a cultural resources management program which meets both legal and project planning requirements. The program operates in coordination with the New Mexico State Historical Preservation Office. Major elements of the Laboratory program are illustrated by a current project involving relocation of a homesteader's cabin located on land required for a major new facility. The Laboratory cultural resource management program couples routine oversight of all engineering design projects with onsite resource surveys and necessary mitigation prior to construction. The Laboratory has successfully protected major archaeological and historical ruins, although some problems remain. The cultural resource program is intended to be adjustable to new needs. A cultural resource management plan will provide long-term management guidance.

Olinger, C.E.; Rea, K.H.

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

University of Aberdeen Carbon Management Plan  

E-Print Network [OSTI]

of Aberdeen is committed to reducing its carbon footprint and to playing its part in limiting the worstUniversity of Aberdeen Carbon Management Plan Higher Education Carbon Management Programme working with Page 1 The University of Aberdeen Carbon Management Programme Carbon Management Plan (CMP

Levi, Ran

142

ICDF Complex Operations Waste Management Plan  

SciTech Connect (OSTI)

This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

W.M. Heileson

2006-12-01T23:59:59.000Z

143

Materials Sciences Division Integrated Safety Management Plan  

E-Print Network [OSTI]

Materials Sciences Division Integrated Safety Management Plan Revised: February 9, 2012 Prepared by: signed Feb. 9, 2012 Rick Kelly, Facility/EH&S Manager Submitted by: signed Feb. 9, 2012 Miquel Salmeron.1 RESPONSIBILITY AND AUTHORITY THROUGH LINE MANAGEMENT............................................................5

144

Managing talent flow. 2006 Energy and Resources  

E-Print Network [OSTI]

Managing talent flow. 2006 Energy and Resources Talent Pulse Survey Report Consulting #12;Executive ................................................................ 13 Contents #12;1 Managing talent flow 2006 Energy and Resources Talent Pulse Survey Report 2006 strategy. 1 #12;2 Managing talent flow 2006 Energy and Resources Talent Pulse Survey Report Key findings

145

Community-based Natural Resource Management  

E-Print Network [OSTI]

with respect to access, use or management of a resource (e.g. grass, water, trees, wildlife) #12;Right to sellCommunity-based Natural Resource Management: State of the Science--Global Perspectives María E stocking rates to within carrying capacity) Management Obtain resource units (e.g. hunt wildlife, graze

146

Effects of Brush Management on Water Resources  

E-Print Network [OSTI]

TR-338 2008 Effects of Brush Management on Water Resources By: C. Allan Jones and Lucas Gregory, Texas Water Resources Institute, Texas A&M AgriLife Texas Water Resources Institute Technical Report... November 2008 Effects of Brush Management on Water Resources By Allan Jones and Lucas Gregory Texas Water Resources Institute Texas A&M AgriLife November 2008 TR-338 2008 1 Summary ? For several decades, land managers have cleared brush...

Jones, C. Allan; Gregory, Lucas

147

Paducah Site Management Plan | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiativesNationalNuclearRocky Mountain OTCAnnualEnd StateManagement Plan

148

NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop  

SciTech Connect (OSTI)

Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

Renne, D.

2008-10-29T23:59:59.000Z

149

Oak Ridge National Laboratory Waste Management Plan  

SciTech Connect (OSTI)

The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1992-12-01T23:59:59.000Z

150

Oak Ridge Reservation Waste Management Plan  

SciTech Connect (OSTI)

This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

Turner, J.W. [ed.

1995-02-01T23:59:59.000Z

151

WATER RESOURCES PLANNING ACT Q:\\COMP\\WATER1\\WRPA  

E-Print Network [OSTI]

103 WATER RESOURCES PLANNING ACT Q:\\COMP\\WATER1\\WRPA December 29, 2000 #12;Q:\\COMP\\WATER1\\WRPA December 29, 2000 #12;105 WATER RESOURCES PLANNING ACT [As Amended Through P.L. 106­580, Dec. 29, 2000 planning of water and related land resources, through the establishment of a water resources council

US Army Corps of Engineers

152

Storm Water Management Plan Program (Nebraska)  

Broader source: Energy.gov [DOE]

This legislation implements the National Pollutant Discharge Elimination System Requirements, and encourages cities and counties to create stormwater management plans in order to receive grant...

153

Disruption Management | Operations Research between planning ...  

E-Print Network [OSTI]

record: it can deliver high quality solutions for planning problems. Impor- ..... Disruption management systems face a number of challenges, some of which have.

154

School Of Resource and Environmental Management  

E-Print Network [OSTI]

School Of Resource and Environmental Management SIMON FRASER UNIVERSITY Sessional Instructor of topics in natural resource management (e.g. ecology, fisheries, forestry, water management Position ­ Spring 2014 ­ REM 412: Environmental Modelling- Applications are invited for one-term sessional

155

Human Resource Management: Employee Compensation Guide  

E-Print Network [OSTI]

Human Resource Management: Employee Compensation Guide Risk Management *Extension Agricultural Economist, Kansas State University Agricultural Experiment Station and Cooperative Extension Service; and Extension Program Specialist III.... ?Employee Compensation and Job Satisfaction on Dairy Farms in the Northeast.? April 1999. Cornell University, RB99-02. Kansas Department of Human Resources. Kansas Wage Survey, 1996 Edition. Rosenberg, Howard. ?Labor Management Decisions.? University...

Fogleman, Sarah L.; McCorkle, Dean

2009-04-08T23:59:59.000Z

156

Managing renewable resources via Collective Intelligence  

E-Print Network [OSTI]

Managing renewable resources via Collective Intelligence Brede, M., F. Boschetti, and D. Mc.Brede,Fabio.Boschetti,David.Mcdonald]@csiro.au Keywords: ABM, Game Theory, Resource Exploitation, Optimisation. EXTENDED ABSTRACT In a recent set of work, 2001; Wolpert et al, 2004) into resource management modelling. These tools were designed to minimise

Boschetti, Fabio

157

FY 1991--FY 1995 Information Technology Resources Long-Range Plan  

SciTech Connect (OSTI)

The Department of Energy has consolidated its plans for Information Systems, Computing Resources, and Telecommunications into a single document, the Information Technology Resources Long-Range Plan. The consolidation was done as a joint effort by the Office of ADP Management and the Office of Computer Services and Telecommunications Management under the Deputy Assistant Secretary for Administration, Information, and Facilities Management. This Plan is the product of a long-range planning process used to project both future information technology requirements and the resources necessary to meet those requirements. It encompasses the plans of the various organizational components within the Department and its management and operating contractors over the next 5 fiscal years, 1991 through 1995.

Not Available

1989-12-01T23:59:59.000Z

158

Operational efficiency through resource planning optimization and work process improvement  

E-Print Network [OSTI]

This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

Balwani, Siddharth (Siddharth Vashdev)

2012-01-01T23:59:59.000Z

159

Risk Management Department of Human Resource Services  

E-Print Network [OSTI]

Risk Management Department of Human Resource Services Workers' Compensation Update RETURN TO WORK or supervisor upon returning to work. The manager or supervisor should fax a copy of the release to Risk, the University's Workers' Compensation Program Manager, at extension 2824 or visit the Risk Management Website

de Lijser, Peter

160

Draft Management Plan Upper Snake Province  

E-Print Network [OSTI]

.......................................................................................4-5 Consistency with Idaho's Water Quality Management Plan...........................4-5 303(dDraft Management Plan Upper Snake Province Submitted To The Northwest Power and Conservation Quality Anti-Degradation Policy (39-3603) ............................................4-8 ESA and CWA

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Office of Facilities Planning and Management  

E-Print Network [OSTI]

Office of Facilities Planning and Management Building Best Practices Through Energy Efficiency;Office of Facilities Planning and Management Recycling Plastics All Bottles and Cans Plastic Metal Glass All #1 and #2 Plastics Eg. Some salad containers NO Styrofoam Lab glass (including test tubes

Ford, James

162

Social Impact Management Plans: Innovation in corporate and public policy  

SciTech Connect (OSTI)

Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes assessment, management and monitoring to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: Social impact management plans are effective strategies to manage social issues. They are developed in partnership with regulatory agencies, investors and community. SIMPs link assessment to ongoing management and address social and community issues. SIMPs clarify responsibilities in the management of impacts, opportunities and risks. SIMPs demonstrate a shift to include management as a core component of SIA practice.

Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

2013-11-15T23:59:59.000Z

163

Automated transportation management system (ATMS) software project management plan (SPMP)  

SciTech Connect (OSTI)

The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

Weidert, R.S., Westinghouse Hanford

1996-05-20T23:59:59.000Z

164

Integrated system dynamics toolbox for water resources planning.  

SciTech Connect (OSTI)

Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.

Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David (University of New Mexico, Albuquerque, NM); Chemak, Janie (University of New Mexico, Albuquerque, NM); Cockerill, Kristan (Cockeril Consulting, Boone, NC); Aragon, Carlos (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining (NM-TECH), Socorro, NM); Roach, Jesse

2006-12-01T23:59:59.000Z

165

Technical Assistance Contractor management plan. Revision 1  

SciTech Connect (OSTI)

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

NONE

1995-08-01T23:59:59.000Z

166

Idaho National Laboratory Cultural Resource Management Annual Report FY 2006  

SciTech Connect (OSTI)

The Idaho National Laboratory Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500-year span of human occupation in the region. As a federal agency, the Department of Energy Idaho Operations Office has legal responsibility for the management and protection of those resources and has delegated these responsibilities to its primary contractor, Battelle Energy Alliance (BEA). The INL Cultural Resource Management Office, staffed by BEA professionals, is committed to maintaining a cultural resource management program that accepts these challenges in a manner reflecting the resources importance in local, regional, and national history. This annual report summarizes activities performed by the INL Cultural Resource Management Office staff during Fiscal Year 2006. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be both informative to internal and external stakeholders, and to serve as a planning tool for future cultural resource management work to be conducted on the INL.

Clayton F. Marler; Julie Braun; Hollie Gilbert; Dino Lowrey; Brenda Ringe Pace

2007-04-01T23:59:59.000Z

167

SUGGESTED THREE-YEAR GRADUATION PLAN Human Development and Family Studies Case Management  

E-Print Network [OSTI]

Development 3 See note 1 on page 2 HDFS 25512 Management of Family Resources 3 HDFS 34031 Cultural DiversitySUGGESTED THREE-YEAR GRADUATION PLAN Human Development and Family Studies ­Case Management THREE-YEAR GRADUATION PLAN Human Development and Family Studies ­Case Management for Individuals

Sheridan, Scott

168

CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan  

E-Print Network [OSTI]

CH 5 MANAGEMENT PLAN.DOC 5-1 5 Management Plan 5.1 Vision The Willamette Subbasin Plan Oversight drafted the following vision: Willamette Basin citizens from all walks of life prize and enjoy a quilt-work of natural areas, working landscapes, and distinctive communities, from the crest of the Coast Range

169

HUMAN RESOURCES WORKING GROUP: ACTION PLAN VISION PRIORITY: MAXIMIZING OUR HUMAN RESOURCES  

E-Print Network [OSTI]

HUMAN RESOURCES WORKING GROUP: ACTION PLAN VISION PRIORITY: MAXIMIZING OUR HUMAN RESOURCES, and student body." From David Ward, "A Vision for the Future," p. 9. This document lists the human-resource goals and plans of the Office of Human Resources, the Equity and Diversity Resource Center

Sheridan, Jennifer

170

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that  

E-Print Network [OSTI]

Data Management Plan (outline) The Data Management Plan (DMP) for a proposal is a two-page document that describes (1) the investigator's commitment to the funder's Data Policy and (2) how the investigator plans to manage the data

171

Rock Art in the Public Trust: Managing Prehistoric Rock Art on Federal Land  

E-Print Network [OSTI]

must have a Cultural Resources Management Plan (CRMP) into as a Cultural Resources Management Plan, or CRMP. ThoseIntegrated Cultural Resources Management Plan, or ICRMP. As

Hale, John Patrick

2010-01-01T23:59:59.000Z

172

2010 Annual Planning Summary for Civilian Radioactive Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

Civilian Radioactive Waste Management (CRWM) 2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM) Annual Planning Summaries briefly describe the status of...

173

MIDDLE SNAKE SUBBASINS MANAGEMENT PLAN SUPPLEMENT PRIORITIZED IMPLEMENTATION  

E-Print Network [OSTI]

MIDDLE SNAKE SUBBASINS MANAGEMENT PLAN SUPPLEMENT ­ PRIORITIZED IMPLEMENTATION NOVEMBER 24, 2004/Browsing..........................................................................................9 Key Limiting Factor #5: Water Quality............................................................................................................................11 Management Plan Considerations

174

Integrated Safety Management System as the Basis for Work Planning...  

Broader source: Energy.gov (indexed) [DOE]

Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development Integrated Safety Management System as the Basis for Work Planning and...

175

System integration test plan for HANDI 2000 business management system  

SciTech Connect (OSTI)

This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

Wilson, D.

1998-08-24T23:59:59.000Z

176

Methylene Chloride Management Plan Review and Approval Authority  

E-Print Network [OSTI]

-8172 (Medical Consultation and Evaluation) Facilities Management Work Control Center (301) 405-2222 (RepairMETHYLENE CHLORIDE MANAGEMENT PLAN #12;#12;Methylene Chloride Management Plan Review and Approval Date #12;ii Methylene Chloride Management Plan #12;Methylene Chloride Management Plan Table of Contents

Rubloff, Gary W.

177

Wildland Fire Management Plan for Brookhaven National Laboratory  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.

Green,T.

2009-10-23T23:59:59.000Z

178

Energy resource management for energy-intensive manufacturing industries  

SciTech Connect (OSTI)

A program to introduce energy resource management into an energy-intensive manufacturing industry is presented. The food industry (SIC No. 20) was chosen and 20 companies were selected for interviews, but thirteen were actually visited. The methodology for this program is detailed. Reasons for choosing the food industry are described. The substance of the information gained and the principal conclusions drawn from the interviews are given. Results of the model Energy Resource Management Plan applied to three companies are compiled at length. Strategies for dissemination of the information gained are described. (MCW)

Brenner, C.W.; Levangie, J.

1981-10-01T23:59:59.000Z

179

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency-Arriving Summer/Fall Chinook 97 Table B.5 Tribal Incidental Take Thresholds for ESA-Listed 98 Upper Columbia River

180

Project Management Plan Examples 1- 80  

Broader source: Energy.gov [DOE]

The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. Thedescriptions below should be used to navigate to the subject of...

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Imnaha Subbasin Management Plan Subbasin Lead Entity  

E-Print Network [OSTI]

Imnaha Subbasin Management Plan May 2004 Written by Ecovista Subbasin Lead Entity: Nez Perce Tribe....................................................................................... 6 1.2.4 Ecovista Website Information.......................................................................... 59 4.3 Terrestrial Data and Information Gaps

182

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

2005-08-26T23:59:59.000Z

183

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

2005-08-26T23:59:59.000Z

184

1. Emergency Management Plan ACTIVE SHOOTER RESPONSE  

E-Print Network [OSTI]

1. Emergency Management Plan ACTIVE SHOOTER RESPONSE #12;The world has changed!The world has ­ But can transition to one of these #12;Why is this Necessary? Within the last five years, there have been

185

Integrating Knowledge Management and Human Resources via Skill Management  

E-Print Network [OSTI]

Integrating Knowledge Management and Human Resources via Skill Management Norbert Gronau. The human resources department can look for certain skills and compare the skills of an employee [Kreitmeier et al. 2000]. The company is able to save costs that otherwise apply to placing adverts for job

Appelrath, Hans-Jrgen

186

Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems  

SciTech Connect (OSTI)

This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

2013-01-01T23:59:59.000Z

187

Strategic Planning System for Exotic Game Management  

E-Print Network [OSTI]

STRATEGIC PLANNING SYSTEM FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Submitted to the Office of Graduate Studies of Texas ASM University in partial fulfillment of the requirements for the degree of MASTER... OF SCIENCE December 1988 Major Subject: Range Science STRATEGIC PLANNING FOR EXOTIC GAME MANAGEMENT A Thesis by JEANNE MARIE PETROFES LUBBERING Approved as to style and content by: J ry W. uth (Ch ir of Committee) Steve Archer (Member) Duane C...

Lubbering, Jeanne Marie Petrofes

1988-01-01T23:59:59.000Z

188

Resource portfolio management: bundling process  

E-Print Network [OSTI]

of the crisis, even if the crisis is not as serious as initially thought, thereby turning the distraction into the real threat. Environmental scanning (Hambrick, 1981, 1982) theory predicts that managers will focus their attention on the external forces...

Worthington, William John

2009-05-15T23:59:59.000Z

189

Warner College of Natural Resources 2005-2010 Strategic Plan  

E-Print Network [OSTI]

of renewable and non-renewable resources. #12;SOCIETAL GOALS Human dimensions (human understandingWarner College of Natural Resources 2005-2010 Strategic Plan Executive Summary #12;WARNER COLLEGE OF NATURAL RESOURCES 2005-2010 STRATEGIC PLAN Executive Summary Our Vision To be the global leader

190

MSU Departmental Assessment Plan Department: Land Resources and Environmental Sciences  

E-Print Network [OSTI]

MSU Departmental Assessment Plan 2007-2009 Department: Land Resources and Environmental Sciences (cross-college) #12;Student Outcomes Assessment Plan Land Resources and Environmental Sciences Department The Department of Land Resources and Environmental Sciences (LRES) will undertake a continuing assessment

Maxwell, Bruce D.

191

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network [OSTI]

AND PLANNING M&P-144 the Agency's workforce is well informed of major Agency initiatives and human capitalManagement and Performance PERFORMANCE REPORTING AND PLANNING M&P-143 Strategic Goal 5: Enable.1: IDENTIFY, CULTIVATE, AND SUSTAIN A DIVERSE WORKFORCE AND INCLUSIVE WORK ENVIRONMENT THAT IS NEEDED

192

ORNL long-range environmental and waste management plan  

SciTech Connect (OSTI)

This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

1989-09-01T23:59:59.000Z

193

WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.  

SciTech Connect (OSTI)

This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.

ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

2003-09-01T23:59:59.000Z

194

Electronic Resource Management Systems From ILS Vendors  

E-Print Network [OSTI]

For several years libraries, especially larger libraries and research libraries, have been more and more desperately seeking systems and tools to help them manage electronic resources for several years. To date, most ...

Duranceau, Ellen

195

Puget Sound Energy- Resource Conservation Manager Program  

Broader source: Energy.gov [DOE]

Puget Sound Energy's (PSE) Resource Conservation Manager Program (RCM) provides funding and support to customers who hire a RCM. The role of an RCM is to increase efficiency by focusing on...

196

Department of Energy Management of Cultural Resources  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Policy is to ensure that Department of Energy (DOE) programs, including the National Nuclear Security Administration (NNSA), and field elements integrate cultural resources management into their missions and activities. Certified 1-28-11. No cancellation.

2001-05-02T23:59:59.000Z

197

School Of Resource and Environmental Management  

E-Print Network [OSTI]

Ecology. Course description REM 311 will examine the ecological processes governing the dynamics of populations, with an emphasis on how our understanding of these processes is applied in contemporary conservation, sustainable resource management, and environmental monitoring. Students will learn about

198

Idaho National Laboratory Cultural Resource Management Annual Report FY 2007  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500-year span of human land use in the region. As a federal agency, the Department of Energy Idaho Operations Office has legal responsibility for the management and protection of those resources and has delegated these responsibilities to its primary contractor, Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts these challenges in a manner reflecting the resources importance in local, regional, and national history. This annual report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2007. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be both informative to internal and external stakeholders, and to serve as a planning tool for future cultural resource management work to be conducted on the INL.

Julie Braun; Hollie Gilbert; Dino Lowrey; Clayton Marler; Brenda Pace

2008-03-01T23:59:59.000Z

199

John Angelis named Manager, Information Resource Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson LabJeffersonStandards andJianzhiAboutJoeJohn A.

200

College of Agricultural Sciences and Natural Resources Curriculum Committee Planning and Transition Meeting  

E-Print Network [OSTI]

College of Agricultural Sciences and Natural Resources Curriculum Committee Planning and Transition and how they can be of relevance to contemporary issues of Great Plains land management and resource considerable ecological and cultural diversity, encompassing more than 600 million acres which have been

Powers, Robert

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

2011-2015 Human Capital Management Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

This Human Capital Management Plan (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. 2011-2015 Human Capital Management Plan More...

202

Water Resources Management Practicum 2006 Nelson Institute for Environmental Studies  

E-Print Network [OSTI]

2007 Water Resources Management Practicum 2006 Nelson Institute for Environmental Studies for Environmental Studies, 608/262-7996. The Water Resources Management Practicum is a regular part for Monona Bay, Madison, Wisconsin #12;Water Resources Management Practicum Nelson Institute

Sheridan, Jennifer

203

The plan as a cognitive-resource-saving tool 1 The plan as a cognitive-resource-saving tool: planning and anticipation,  

E-Print Network [OSTI]

The plan as a cognitive-resource-saving tool 1 The plan as a cognitive-resource-saving tool, 33076 Bordeaux, France. hal-00675426,version1-1Mar2012 #12;The plan as a cognitive-resource-saving tool is user-centred: the understanding of the cognitive mechanisms underlying the anticipation process allows

Paris-Sud XI, Université de

204

6 Management Plan 6.1.1 Introduction  

E-Print Network [OSTI]

management). The management plan is made up of six components: 1) the vision for the subbasin; 2) the working management is used to respond to the outcomes of these "tests" of "working hypotheses." Hypotheses192 6 Management Plan 6.1.1 Introduction Emphasis in this management plan is placed on selected

205

Utilities Department Resource Management Division  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: Salt Lake City, Utah Zip: 84111Jump to: navigation,Department

206

ENVIRONMENTAL STUDIES PROGRAM RENEWABLE RESOURCES & ENERGY POLICY & MANAGEMENT SPECIALIST  

E-Print Network [OSTI]

ENVIRONMENTAL STUDIES PROGRAM RENEWABLE RESOURCES & ENERGY POLICY & MANAGEMENT SPECIALIST to research and teaching in areas of renewable energy, resource management and environmental policy

Martin, Jeff

207

Oak Ridge National Laboratory Waste Management Plan  

SciTech Connect (OSTI)

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

208

2013 Strategic Planning Initiative Market/Demand Resources Index of Resources  

E-Print Network [OSTI]

Workforce Profile 16. WWAMI Physician Workforce 2005 17. UA Expanding Access to Health Programs (EAHP) Plan 18. State Health Care Workforce Development Planning Grant Planning Alaska's Health Workforce FINAL;2013 Strategic Planning Initiative Market/Demand Resources Title: 2009 Alaska Health Workforce Vacancy Study

Pantaleone, Jim

209

MSU Departmental Assessment Plan Department: Land Resources and Environmental Sciences  

E-Print Network [OSTI]

MSU Departmental Assessment Plan 2009-2010 Department: Land Resources and Environmental Sciences: Ecology and Environmental Sciences (cross-college) #12;Student Outcomes Assessment Plan Land Resources Department Head: Tracy M. Sterling Assessment Coordinator: Cathy Zabinski Degrees/Majors/Options Offered

Maxwell, Bruce D.

210

BUSINESS CONTINUITY PLANNING RESOURCES FOR SMALL-AND MEDIUM-  

E-Print Network [OSTI]

BUSINESS CONTINUITY PLANNING RESOURCES FOR SMALL- AND MEDIUM- SIZED BUSINESSES May 2010 Prepared and supported by the Northwest Regional Technology Center for Homeland Security Business Continuity Planning Resources for Small- and Medium- Sized Businesses KS Judd AM Lesperance May 14, 2010 #12;DISCLAIMER

211

Treatment of Solar Generation in Electric Utility Resource Planning (Presentation)  

SciTech Connect (OSTI)

Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. Through interviews and a questionnaire, the authors gathered information on utility supply planning and how solar is represented. Utilities were asked to provide their resource planning process details, key assumptions (e.g. whether DG is represented as supply or negative load), modeling methodology (e.g. type of risk analytics and candidate portfolio development), capacity expansion and production simulation model software, and solar project representation (project size, capacity value and integration cost adder). This presentation aims to begin the exchange of information between utilities, regulators and other stakeholders by capturing utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

Cory, K.; Sterling, J.; Taylor, M.; McLaren, J.

2014-01-01T23:59:59.000Z

212

The role of strategic planning in emergency management  

SciTech Connect (OSTI)

Rapid technology development, competition for resources, and an increasing awareness of the global community are but a few of the many forces and trends affecting today`s Emergency Management Organizations. Implementing a continuous Strategic Planning process helps an Emergency Management Organization to formulate responses to issues such as those stated above. By continuously monitoring the forces and trends in its environment, the organization is able to succinctly identify its strategic issues and subsequently frame an appropriate infrastructure of goals, objectives, and strategies. Strategic Planning also holds significant potential for the emergency management community at large. The wide range of expertise and the inherent dependencies between Emergency Management Organizations at all levels of government -- including the local, national, and international arenas -- makes the emergency management community an ideal candidate to capitalize on the benefits resulting from joint strategic planning. The identification of common issues, priorities, and requirements provides the foundation for increased resource and information sharing, as well as the formulation of strategic partnerships between organizations to battle common threats.

Douglas, N.B. [National Communications System, Arlington, VA (United States); Harrison, G.T. [Booz, Allen and Hamilton, Inc., McLean, VA (United States)

1995-12-31T23:59:59.000Z

213

INEEL Cultural Resource Management Program Annual Report - 2004  

SciTech Connect (OSTI)

As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The Idaho National Engineering and Environmental Laboratory Site is located in southeastern Idaho, and is home to vast numbers and a wide variety of important cultural resources representing at least 13,000-year span of human occupation in the region. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these resources with the management and ongoing operation of an active scientific laboratory, while also cleaning up the waste left by past programs and processes. The Department of Energy Idaho Operations Office has administrative responsibility for most of the Site, excluding lands and resources managed by the Naval Reactors Facility and (in 2004) Argonne National Laboratory-West. The Department of Energy is committed to a cultural resource program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative requirements. This annual report is an overview of Cultural Resource Management Program activities conducted during Fiscal Year 2004 and is intended to be both informative to external stakeholders and to serve as a planning tool for future cultural resource management work to be conducted on the Site.

Clayton F. Marler

2005-01-01T23:59:59.000Z

214

Virginia Wetlands Report Center for Coastal Resources Management www.ccrm.vims.edu  

E-Print Network [OSTI]

Virginia Wetlands Report Center for Coastal Resources Management www.ccrm.vims.edu Volume 26, Issue things, requires VIMS to provide Comprehensive Coastal Resource Management Plans (CCRMP) for each these requests to dawnf@ vims.edu. Looking forward to hearing from you. Thanks. #12;2 BMPs for Erosion Control

215

CRAD, Configuration Management Assessment Plan  

Broader source: Energy.gov [DOE]

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

216

Utility Integrated Resource Planning: An Emerging Driver of New Renewable Generation in the Western United States  

E-Print Network [OSTI]

towards that portfolio. Renewable resources were once rarelyobjectively evaluate renewable resources. Planned Renewableamount of planned renewable resource additions. In the case

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

217

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

E-Print Network [OSTI]

Planning with Renewable Resources. The Electricityindirect costs of renewable resources, as well as resourceamount of planned renewable resource additions. In the case

Wiser, Ryan; Bolinger, Mark

2005-01-01T23:59:59.000Z

218

Annex 3 Resource Management Review The following questions will be addressed by the Resource Management Review  

E-Print Network [OSTI]

Management Review: Work Breakdown Structure Is there a valid work breakdown structure? Does it coverAnnex 3 ­ Resource Management Review The following questions will be addressed by the Resource the complete project? Are there work package (WP) descriptions? Are these detailed enough? Do they have WP

219

The University of Montana continues its commitment to increased accountability and linkage of Planning, Resource Allocation, and Assessment. This second annual Institutional Assessment Report illustrates not only that commitment,  

E-Print Network [OSTI]

of Planning, Resource Allocation, and Assessment. This second annual Institutional Assessment Report. Strategic planning, budgeting, implementation, and assessment are essential components of the resource illustrates not only that commitment, but also the positive outcomes of strategic resource management

Vonessen, Nikolaus

220

State Lands Management Plan Randell Mound at Pineland  

E-Print Network [OSTI]

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

State Lands Management Plan Clark Island at Cedar Key  

E-Print Network [OSTI]

resources . . . . . . . . . 21. Plans for Non-renewable Natural and Cultural Resources . . . . 22 and Improvements . . . . . . . . . 4. Proximity to Significant Public Resources . . . . . . . . . . . 5 RESOURCES . . . . . . . . . . . . . . 8. Resources Listed in the Florida Natural Areas Inventory . . . . 9

Slatton, Clint

222

Project Hanford management contract quality improvement project management plan  

SciTech Connect (OSTI)

On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

ADAMS, D.E.

1999-03-25T23:59:59.000Z

223

Water resources planning under climate change and variability  

E-Print Network [OSTI]

Scenario to Climatic Changes. Water Resources Management 19:2006) Quantifying the Urban Water Supply Impacts of Climateto the Shape of Supply? Water Demand Under Heterogeneous

O'Hara, Jeffrey Keith

2007-01-01T23:59:59.000Z

224

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

E-Print Network [OSTI]

Planning with Renewable Resources. The Electricity14 4.1 Renewable Resources20 5. Renewable Resource Cost and Performance

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

225

Individual Development and Excutive Development Plan Resources  

Broader source: Energy.gov [DOE]

According to OPM, an individual development plan (IDP) is a tool to assist employees in career and personal development. Its primary purpose is to help employees reach short and long-term career...

226

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency Take Thresholds for ESA-Listed 44 Upper Columbia River Steelhead Table 4. Tribal & Recreational Incidental Take Thresholds 45 for Unmarked Spring Chinook Table 5. Estimated Carrying Capacity of Natural

227

Water quality management plan for Cherokee Reservoir  

SciTech Connect (OSTI)

The management plan provides an assessment of Cherokee Reservoir's current water quality, identifies those factors which affect reservoir water quality, and develops recommendations aimed at restoring or maintaining water quality at levels sufficient to support diverse beneficial uses. 20 references, 8 figures, 15 tables. (ACR)

Not Available

1984-01-01T23:59:59.000Z

228

Data Management Plan Types of Data  

E-Print Network [OSTI]

Data Management Plan Types of Data The research described herein will lead to the discovery of new will be followed by electrochemistry, Raman spectroscopy and optical spectroscopy. All data will be stored electronically in word processing documents. Data Standards All data will be stored in an electronic format

Tam, Tin-Yau

229

Agricultural Systems Management UNOFFICIAL DEGREE PLAN  

E-Print Network [OSTI]

Agricultural Systems Management UNOFFICIAL DEGREE PLAN STUDENT'S NAME: Catalog 2011 STUDENT'S ID 310 (2-2) 3 AGSM 301; AGEC 330 STAT 302 (3-0) or MATH 141 Tech. Elective3 3 STAT 303 (3-0) 3 MATH 141

230

Hanford emergency management plan - release 15  

SciTech Connect (OSTI)

The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

CARPENTER, G.A.

1999-07-19T23:59:59.000Z

231

Site Management Plan Page 1  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C.Green River, Utah,Tuba City,'1 ~(3JlpV40s

232

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land SurfaceVirus-Infected Macaques through Functional Genomics and

233

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared Land SurfaceVirus-Infected Macaques through Functional Genomics and

234

Environmental restoration and remediation technical data management plan  

SciTech Connect (OSTI)

The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

Key, K.T.; Fox, R.D.

1994-02-01T23:59:59.000Z

235

Workplan and Annex: Solar Resource Knowledge Management  

SciTech Connect (OSTI)

''Solar Resource Knowledge Management'' will be a new task under the International Energy Agency's Solar Heating and Cooling Programme. The task development has involved researchers from Germany, France, Switzerland, Spain, Portugal, Italy, Canada, the U.S. that have been engaged in the use of satellite imagery to develop solar resource maps and datasets around the world. The task will address three major areas: (1) ''Benchmarking'' of satellite-based solar resource methods so that resource information derived from approaches developed in one country or based on a specific satellite can be quantitatively intercompared with methods from other countries using different satellites, as well as with ground data; (2) Data archiving and dissemination procedures, especially focusing on access to the data by end users; and (3) basic R&D for improving the reliability and usability of the data, and for examining new types of products important to the solar industry, such as solar resource forecasts.

Renne, D.

2005-01-01T23:59:59.000Z

236

Avista 2011 Integrated Resource Plan Clint Kalich  

E-Print Network [OSTI]

prices Slower load growth Continued gas reliance Less wind More conservation and bigger budgets Existing Resources Avista Load Forecast Energy, Capacity, & RPS Balances New Resource Options & Costs Cost Negative Price Duration Curve -40 -35 -30 -25 -20 -15 -10 -5 0 0.0% 0.5% 1.0% 1.5% 2.0% 2.5% 3.0% 3

237

Wildlife Management Plan for the Oak Ridge Reservation  

SciTech Connect (OSTI)

This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

Giffen, Neil R [ORNL; Evans, James W. [TWRA; Parr, Patricia Dreyer [ORNL

2007-10-01T23:59:59.000Z

238

Quality of Service Resource Management Michael J. Katchabaw  

E-Print Network [OSTI]

into a working prototype management system. With this prototype system, extensive quality of service management management. iii #12; Keywords: Quality of service management, resource management, distributed systemsQuality of Service Resource Management by Michael J. Katchabaw Graduate Program in Computer Science

Katchabaw, Michael James

239

Resource-Optimal Planning For An Autonomous Planetary Vehicle  

E-Print Network [OSTI]

Autonomous planetary vehicles, also known as rovers, are small autonomous vehicles equipped with a variety of sensors used to perform exploration and experiments on a planet's surface. Rovers work in a partially unknown environment, with narrow energy/time/movement constraints and, typically, small computational resources that limit the complexity of on-line planning and scheduling, thus they represent a great challenge in the field of autonomous vehicles. Indeed, formal models for such vehicles usually involve hybrid systems with nonlinear dynamics, which are difficult to handle by most of the current planning algorithms and tools. Therefore, when offline planning of the vehicle activities is required, for example for rovers that operate without a continuous Earth supervision, such planning is often performed on simplified models that are not completely realistic. In this paper we show how the UPMurphi model checking based planning tool can be used to generate resource-optimal plans to control the engine of ...

Della Penna, Giuseppe; Magazzeni, Daniele; Mercorio, Fabio; 10.5121/ijaia.2010.1302

2010-01-01T23:59:59.000Z

240

Criteria for an effective water resource planning process  

E-Print Network [OSTI]

In examining the present status of water resource planning in the Pacific Northwest, numerous critical inadequacies become readily apparent. One method of minimizing some of these inadequacies is through administrative ...

Bowers, James Myron

1961-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Hawaii Bioenergy Master Plan Land and Water Resources  

E-Print Network [OSTI]

Hawaii Bioenergy Master Plan Land and Water Resources Submitted to Hawaii Natural Energy Institute, SLH 2007, Part III, "The primary objective of the bioenergy master plan shall be to develop a Hawaii of any bioenergy crops in Hawaii is the availability of the land and water necessary to produce

242

Treatment of Solar Generation in Electric Utility Resource Planning  

SciTech Connect (OSTI)

Today's utility planners have a different market and economic context than their predecessors, including planning for the growth of renewable energy. State and federal support policies, solar photovoltaic (PV) price declines, and the introduction of new business models for solar PV 'ownership' are leading to increasing interest in solar technologies (especially PV); however, solar introduces myriad new variables into the utility resource planning decision. Most, but not all, utility planners have less experience analyzing solar than conventional generation as part of capacity planning, portfolio evaluation, and resource procurement decisions. To begin to build this knowledge, utility staff expressed interest in one effort: utility exchanges regarding data, methods, challenges, and solutions for incorporating solar in the planning process. Through interviews and a questionnaire, this report aims to begin this exchange of information and capture utility-provided information about: 1) how various utilities approach long-range resource planning; 2) methods and tools utilities use to conduct resource planning; and, 3) how solar technologies are considered in the resource planning process.

Sterling, J.; McLaren, J.; Taylor, M.; Cory, K.

2013-10-01T23:59:59.000Z

243

A Spatial Planning and Analysis System for Wildland Fire Management  

E-Print Network [OSTI]

STARFIRE 11/29/2011 A Spatial Planning and Analysis System for Wildland Fire Management Welcome is an advanced and powerful spatial fire management planning and analysis system which is designed to provide visual and analytic support for fire management planning, decisions and communication. The system

244

NARSTO Quality Planning and Data Management Handbooks Executive Summary  

E-Print Network [OSTI]

'existingqualityassuranceprograms. The first of the three documents, the NARSTO Quality Systems Management Plan (QSMP), is the umbrella underNARSTO Quality Planning and Data Management Handbooks Executive Summary This brief Executive, and guidance documents for quality planning and data management. NARSTO is a non-binding, tri-national public

245

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect (OSTI)

The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

246

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect (OSTI)

The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

247

Agricultural Systems Management UNOFFICIAL DEGREE PLAN  

E-Print Network [OSTI]

Agricultural Systems Management UNOFFICIAL DEGREE PLAN STUDENT'S NAME: Catalog 2013 STUDENT'S ID AGSM 315 (2-2) 3 PHYS 201 AGEC 340 (3-0) 3 U3/U4 AGSM 325 (2-2) 3 STAT 302 (3-0) or MATH 141 Tech. Elective3 3 STAT 303 (3-0) 3 MATH 141 15 Am. Hist. Elect1 (3-0) 3 15 SENIOR AGEC 315 (3-0) or U3/U4 AGSM

Behmer, Spencer T.

248

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

E-Print Network [OSTI]

in their treatment of renewable resources and the costs andPlanning with Renewable Resources. The Electricityindirect costs of renewable resources, as well as resource

Wiser, Ryan; Bolinger, Mark

2005-01-01T23:59:59.000Z

249

COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material  

E-Print Network [OSTI]

COORDINATING HUMAN AND MATERIAL RESOURCES Construction project management is the art of directing and coordinating human and material resources throughout the life of a project by using modern management. Today's construction engineers and managers are faced with unprecedented challenges in planning

Simaan, Nabil

250

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

251

Cultural resource management: The risk of compliance  

SciTech Connect (OSTI)

The statutory mandate for federal agencies to involve American Indians in the management of cultural resources may create a cultural risk for the people those statutes are intended to protect. A conceptual framework is given to help understand this dilemma. Factors that can exacerbate the severity of the adverse cultural impacts for tribal people are also examined. Policy recommendations are offered for reducing tensions among an the participants in the statutory process.

Curtis, S.A.

1994-02-01T23:59:59.000Z

252

5 Management Plan The management plan described in this section is a culmination of extraordinary efforts by the  

E-Print Network [OSTI]

work together to "derive" and establish the key elements of the Management Plan. Assessment290 5 Management Plan The management plan described in this section is a culmination as a laborious result of carrying out the assessment and inventory work and formation of the vision, goals

253

MA - Office of Management - Energy Conservation Plan  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUAL REPORTMA Energy Conservation Plan January 2010 1 Office

254

Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management  

SciTech Connect (OSTI)

The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

A. David Lester

2008-10-17T23:59:59.000Z

255

Local government involvement in long term resource planning for community energy systems  

SciTech Connect (OSTI)

A program was developed to coordinate governmental, research, utility, and business energy savings efforts, and to evaluate future potential actions, based on actual field data obtained during the implementation of Phase I of the State Resource Plan. This has lead to the establishment of a state conservation and energy efficiency fund for the purpose of establishing a DSM Program. By taking a state wide perspective on resource planning, additional savings, including environmental benefits, can be achieved through further conservation and demand management. This effort has already blossomed into a state directive for DSM programs for the natural gas industry.

Not Available

1992-03-01T23:59:59.000Z

256

Strategic Energy Management Plan for the 1990's  

E-Print Network [OSTI]

This paper describes the strategic energy management plan implemented by the Defense Systems and Electronics Group (DSEG) of Texas Instruments (TI) to enable it to meet its energy management challenge into the 1990's. The strategic energy management...

Fiorino, D. P.; Priest, J. W.

1987-01-01T23:59:59.000Z

257

2004 Power Marketing Plan - Base Resource Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience hands-on halloweenReliable7O(α, X)CJune

258

National Ignition Facility Cryogenic Target Systems Interim Management Plan  

SciTech Connect (OSTI)

Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety & Health (ES&H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for delivering this system will be decided at the national level, based on experiment campaign requirement dates that will be derived through this process. The current milestone date for achieving indirect-drive ignition on the NIF is December 2010. Maintaining this milestone requires that the cryogenic systems be complete and available for fielding experiments early enough that the planned experimental campaigns leading up to ignition can be carried out. The capability of performing non-ignition cryogenic experiments is currently required by March 2006, when the NIF's first cluster of beams is operational. Plans for cryogenic and non-cryogenic experiments on the NIF are contained in NNSA's Campaign 10 Program Plans for Ignition (MTE 10.1) and High Energy Density Sciences (MTE 10.2). As described in this document, the NCTS Program Manager is responsible for managing NIF Cryogenic Target Systems development, engineering, and deployment. Through the NIF Director, the NCTS Program Manager will put in place an appropriate Program Execution Plan (draft attached) at a later time consistent with the maturing and funding these efforts. The PEP will describe management methods for carrying out these activities.

Warner, B

2002-04-25T23:59:59.000Z

259

Natural resource management activities at the Savannah River Site. Environmental Assessment  

SciTech Connect (OSTI)

This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

Not Available

1993-07-01T23:59:59.000Z

260

UMTRA Project Office Records Management Plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office maintains two distinct records handling areas. One of the areas is maintained by a Technical Assistance Contractor (TAC), and is referred to as the UMTRA Project Document Control Center (UPDCC). The UPDCC manages all UMTRA records except those dealing with contracts, personnel, budgeting, finance, and any other documents which are of a purely administrative nature. The second area, the UMTRA Project Administrative Files Collection (UPAFC), contains all those records listed above that are not managed by the UPDCC. This Records Management Plan (RMP) for the UPAFC will be the framework for identifying the elements and activities that relate to the management and operational aspects involved in the handling of UPAFC. Guidelines for the program will be obtained from US Department of Energy (DOE) Orders. DOE Orders implement the guidelines issued by the National Archives and Records Administration (NARA), the final authority for records management. The RMP will address the life cycle of records, including their creation, maintenance, use, and disposition.

Not Available

1993-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE Real Property Asset Management Plan 2005 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2atReal_Property_Asset_Managment_Plan_AMP_Report_Aug05.pdf More

262

Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies  

E-Print Network [OSTI]

Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies University Context 2006 #12;#12;Water Resources Management Practicum 2005 Nelson Institute for Environmental Studies/263-2741 (voice/TDD), for information and referral. The Water Resources Management Practicum is a regular part

Sheridan, Jennifer

263

Driving Resource Management With ApplicationLevel Quality of Service  

E-Print Network [OSTI]

Driving Resource Management With ApplicationLevel Quality of Service Specifications Michael Jdriven approach to resource management to support quality of service. We present our general strategy, the design resource management. Appeared in Decision Support Systems Journal, Volume 28, Elsevier Science Press, 2000

Katchabaw, Michael James

264

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE  

E-Print Network [OSTI]

The University of Oklahoma OU RETIREMENT PLANS MANAGEMENT COMMITTEE March 30, 2011 President Boren established the OU Retirement Plans Management Committee to identify ways for OU to help increase its,000 OU employees participating in the retirement savings plans. A transition period to the master

Oklahoma, University of

265

James F. Argue Nuclear Engineering and Planning Manager  

E-Print Network [OSTI]

James F. Argue Nuclear Engineering and Planning Manager Portsmouth Naval Shipyard Naval Sea Systems Command In June of 2003 Mr. Argue was assigned as the Nuclear Engineering and Planning Manager, a Senior Executive position. Mr. Argue is the head of the Nuclear Engineering and Planning Department

266

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

2005-08-26T23:59:59.000Z

267

EIS-0182: Western Area Power Administration Energy Planning and Management Program  

Broader source: Energy.gov [DOE]

The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

268

California Groundwater Management Plans | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin: EnergyBoston Areais3: Crystalline RockCaldera2California EndangeredCodePlans

269

Carbon Management Plan for the Exeter Campuses 2010-2020  

E-Print Network [OSTI]

and Awards 3.4.6 Local Drivers 4 Carbon Management Strategy 4.1 Vision 4.2 University Strategic Plan 4 Energy Manager Carbon Management Plan 2010 - 2020 Contents 1 Forewords 1.1 Foreword from the Vice Drivers 3.4.2 National Drivers - Legislation 3.4.3 National Drivers Government Strategy for Carbon

Bearhop, Stuart

270

Arid Lands Ecology Facility management plan  

SciTech Connect (OSTI)

The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

None

1993-02-01T23:59:59.000Z

271

Employment Opportunity at Plan-It Geo Natural Resources Technician ($13-16/hour dep. on qualifications/experience)  

E-Print Network [OSTI]

, water resources analysis, and decision support systems. We are seeking a full-time, entry-level team or background in forestry, urban ecology, ecosystems management, water/natural resources inventory, or land use involving GIS, remote sensing, and web- based solutions for urban forest planning, cost/benefit analysis

272

Water Management Plans for Surface Coal Mining Operations (North Dakota)  

Broader source: Energy.gov [DOE]

A water management plan is required for all surface coal mining operations. This plan must be submitted to the State Engineer of the State Water Commission at the same time a surface mining permit...

273

Utility Integrated Resource Planning: An Emerging Driver of New Renewable Generation in the Western United States  

E-Print Network [OSTI]

in their treatment of renewable resources and the costs andtowards that portfolio. Renewable resources were once rarelyobjectively evaluate renewable resources. Planned Renewable

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

274

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

E-Print Network [OSTI]

Planning with Renewable Resources. The Electricityin their treatment of renewable resources and the costs andcost and value of renewable resources, and reflect the fact

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

275

Management and operating contractor plan for transition to the project Hanford Management Contractor  

SciTech Connect (OSTI)

This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

Waite, J.L., Westinghouse Hanford

1996-06-27T23:59:59.000Z

276

An Incentive Compatible Mechanism for Distributed Resource Planning  

E-Print Network [OSTI]

process and their economic incentives. If agents are not provided with proper incentives, they mayAn Incentive Compatible Mechanism for Distributed Resource Planning Erhan Kutanoglu Department is that without proper incentives, agents may not reveal this information trufully and they may not behave

Wu, David

277

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

278

Strategic Energy Management Plan For Fort Buchanan, Puerto Rico  

SciTech Connect (OSTI)

This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Strategic Energy Management Plan for the Site. A strategy has been developed with three major elements in mind: 1) development of a strong foundation from which to build, 2) understanding technologies that are available, and 3) exploring financing options to fund the implementation of improvements. The objective of this report is to outline a strategy that can be used by Fort Buchanan to further establish an effective energy management program. Once a strategy is accepted, the next step is to take action. Some of the strategies defined in this Plan may be implemented directly. Other strategies may require the development of a more sophisticated tactical, or operational, plan to detail a roadmap that will lead to successful realization of the goal. Similarly, some strategies are not single events. Rather, some strategies will require continuous efforts to maintain diligence or to change the culture of the Base occupants and their efforts to conserve energy resources.

Parker, Steven A.; Hunt, W. D.

2001-10-31T23:59:59.000Z

279

area management plan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 NEW RIVER AREA OF CRITICAL ENVIRONMENTAL CONCERN MANAGEMENT PLAN CiteSeer Summary: New River is a dynamic, ever-changing system influenced by biological, climatological,...

280

Spent Nuclear Fuel project integrated safety management plan  

SciTech Connect (OSTI)

This document is being revised in its entirety and the document title is being revised to ``Spent Nuclear Fuel Project Integrated Safety Management Plan.

Daschke, K.D.

1996-09-17T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Integrated Planning and Management for Urban Water Supplies  

E-Print Network [OSTI]

Positions for Water Supply Reliability ................................. 15 4 Shortage Management Modeling.2: Diagram of Water Supply Reliability Model Structure ..................49 5.3: Steps Used in ShortageIntegrated Planning and Management for Urban Water Supplies Considering Multiple Uncertainties Jay

Pasternack, Gregory B.

282

Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.  

SciTech Connect (OSTI)

This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

Childs, Allen

2002-03-01T23:59:59.000Z

283

The Water Resources Management (WRM) program is an interdisciplinary course of study leading to an M.S. degree in environmental studies. Degree requirements include a group  

E-Print Network [OSTI]

#12;Preface The Water Resources Management (WRM) program is an interdisciplinary course of study Leaf (Chapters 1, 2 and 5) Geology, Water Resources Management andrew.t.leaf@gmail.com Amanda Perdzock and Regional Planning michelle.3.scott@gmail.com Benjamin Tansey (Chapter 7) Water Resources Management tansy

Sheridan, Jennifer

284

Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla  

E-Print Network [OSTI]

Survey and Taxonomy of Grid Resource Management Systems Chaitanya Kandagatla University of Texas, Austin Abstract The resource management system is the central component of a grid system. This paper management architectures of popular contemporary grid systems. 1. Introduction Grid systems are inter

Browne, James C.

285

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

286

Resources Annotation, Retrieval and Presentation: a Semantic Annotation Management System  

E-Print Network [OSTI]

Resources Annotation, Retrieval and Presentation: a Semantic Annotation Management System M. Albert@univ-brest.fr ABSTRACT This paper addresses the problem of the management of resources metadata. A variety of responses resources that enable more intelligent information discovery systems [1]. According to [1], a metadata

Paris-Sud XI, Universit de

287

Industrial Engineering & ManagementStrategic Plan 2014-2018  

E-Print Network [OSTI]

Industrial Engineering & ManagementStrategic Plan 2014-2018 College of Engineering, Architecture & Technology #12;Strategic Plan 2014-2018 Industrial Engineering and Management at Oklahoma State University and first Ph.D. in 1960. This School has been represented and led by giants in Industrial Engineering

Piao, Daqing

288

Uranium Mill Tailings Remedial Action Project surface project management plan  

SciTech Connect (OSTI)

This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

Not Available

1994-09-01T23:59:59.000Z

289

Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily  

E-Print Network [OSTI]

Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily Load for Flathead Lake, Montana. #12;11/01/01 DRAFT i October 30, 2001 Draft Nutrient Management Plan and Total Maximum Daily Load..............................................................................................................................2-11 SECTION 3.0 APPLICABLE WATER QUALITY STANDARDS

290

Mitch S. Daugherty Nuclear Engineering and Planning Manager  

E-Print Network [OSTI]

Mitch S. Daugherty Nuclear Engineering and Planning Manager Naval Sea Systems Command, Norfolk Naval Shipyard Mitch Daugherty is the Nuclear Engineering and Planning Manager and the senior civilian. Daugherty also headed the Nuclear Refueling Division, the Nuclear Test Engineering Division, and the Nuclear

291

Proposed resource evaluation plan. Salton Sea scientific drilling program  

SciTech Connect (OSTI)

The report presents a plan for evaluating the deep geothermal resource in the Salton Sea area of Imperial County, California. The plan is divided into two testing programs, followed by the modeling and evaluation of the underground geothermal resource. The testing program related to geological data collection includes acquiring and analyzing the core, running geophysical and temperature/pressure logs in both the deep well and the injection well, and carrying out extensive mud-logging activities. The flow testing program includes temperature, pressure, and flow measurements made in the well and surface facilities. Sampling and analysis of fluid and scale both in the well and at the surface facilities will also be carried out. 6 refs., 7 figs., 7 tabs. (ACR)

Not Available

1985-03-01T23:59:59.000Z

292

Louisiana Solid Waste Management and Resource Recovery Law (Louisiana)  

Broader source: Energy.gov [DOE]

The Louisiana Department of Environmental Quality manages solid waste for the state of Louisiana under the authority of the Solid Waste Management and Resource Recover Law. The Department makes...

293

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network [OSTI]

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

294

Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.  

SciTech Connect (OSTI)

This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.

Childs, Allen B.

2002-03-01T23:59:59.000Z

295

TOPIC REVIEWS IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT  

E-Print Network [OSTI]

of Technology Assessment of the U. S. Congress as part of a broader study of renewable resource management for U of Introduced Animal Species on Renewable Resources in the U. S.-Affiliated Pacific Islands, by LUCIUS G

Mcilwain, Jenny

296

ORIGINAL PAPER Resource management and fertility in Mexico's Sian  

E-Print Network [OSTI]

Fishing Á Resource management Á Population Á Environment Á Mexico Á Latin America Á Caribbean Introduction (Brown 1997). Regulating human fertility and the extraction of non- renewable resources are logical

Lopez-Carr, David

297

Data Management Resources at the Office of Science User Facilities...  

Office of Science (SC) Website

Data Management Resources National Energy Research Scientific Computing Center (NERSC) LBNL Link External link Argonne Leadership Computing Facility (ALCF) ANL Link External link...

298

adaptive resource management: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT Biology and Medicine Websites Summary: of Technology Assessment of the U. S. Congress as part of a broader study of renewable...

299

aquatic resource management: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IN INSULAR RESOURCE DEVELOPMENT AND MANAGEMENT Biology and Medicine Websites Summary: of Technology Assessment of the U. S. Congress as part of a broader study of renewable...

300

Virginia Wetlands Report Center for Coastal Resources Management www.ccrm.vims.edu  

E-Print Network [OSTI]

Virginia Wetlands Report Center for Coastal Resources Management www.ccrm.vims.edu Volume 27, Issue: WORKSHOPANNOUNCEMENT Planning for the Future Thursday, May 24, 2012 at VIMS See inside for information & registration 76, require VIMS to conduct a study of strategies to address recurrent flooding. The study area

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

RESOURCE INVENTORY AND MONITORING CENTER FOR ENVIRONMENTAL MANAGEMENT OF MILITARY LANDS  

E-Print Network [OSTI]

of monitoring intensity with program needs · Integration with resource management plans and NEPA documents I and interfaces · GPS applications and data dictionary development · Data quality assurance and control, and data collection technology is used to support this process. Results also can be integrated with GIS

302

Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

303

PROGRAMMATIC AGREEMENT OPERATION AND MANAGEMENT OF THE  

E-Print Network [OSTI]

9. Main Stem Reservoirs Cultural Resources Management Plans ........................................ 7 10. Five-Year Cultural Resources Implementation Plan ........................................................................................ 11 15. Cultural Resource Education Program

US Army Corps of Engineers

304

Rainwater Wildlife Area Management Plan : Executive Summary.  

SciTech Connect (OSTI)

The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Act directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.

Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.

2002-02-01T23:59:59.000Z

305

Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West  

SciTech Connect (OSTI)

Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-07-11T23:59:59.000Z

306

Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West  

SciTech Connect (OSTI)

Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

Barbose, Galen; Wiser, Ryan; Phadke, Amol; Goldman, Charles

2008-08-01T23:59:59.000Z

307

Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.

None

2005-03-02T23:59:59.000Z

308

Native American Initiative Short Course Management Plan  

SciTech Connect (OSTI)

A training program is outlined for members of Native American tribes having an interest in working in the oil and gas industry. Also, the program will assist tribes whose lands have oil and gas resources to become more familiar with the industry and technology necessary to develop their resources. The proposed program will contribute to meeting the goals of the U.S. Department of Energy's (DOE) Domestic Oil and Gas Initiative to help Native American tribes become more self-sufficient in developing and managing their resources through training in cost-effective, improved technologies for hydrocarbon production that will meet environmental regulations. The training program outlined is for adult tribal representatives who are responsible for managing tribal mineral holdings or setting policy, or who work in the oil and gas industry. The course content is in response to a survey that was developed by BDM-Oklahoma and sent in the spring of 1995 to 26 tribes or tribal agencies which were identified through previous contact with DOE. Tribes were asked to indicate course content needs, levels, preferred time of year, and location. Six tribes responded with specific recommendations and needs. These tribes include the Osage, Creek, Pueblo, Cherokee, St. Regis Mohawk, Northern Arapaho, and Ute Mountain Ute. The results of the survey are included in a table.The training will be conducted at various locations by BDM-Oklahoma technical staff, which , includes geologists, exploration and drilling specialists, oil and gas production specialists, environmental policy specialists, and contract specialists. The proposed training schedule offers three workshops per year and includes those courses identified in the survey by the tribes. The schedule initially proposed in April 1995 has been modified in order to offer training identified by the tribes in the most cost-effective manner. Participants will be able to take two courses, and travel costs will be minimized. A schedule is included in Table 2-1. Contracts have been initiated with several tribes to schedule a training workshop at various tribal locations. Currently, discussions are underway with the Hopi, Ute, Apache, and Osage tribes. Each of the tribal leaders are presenting the training program to their respective councils. The training offered will be a continuation of the workshop started in October, 1996. Modifications to the course content will be integrated into the presentations to meet specific tribal needs. These special technology needs will be identified through discussions with tribal leaders and council members.

Carroll, H.B.

1999-04-27T23:59:59.000Z

309

Amarillo National Resource Center for Plutonium 1999 plan  

SciTech Connect (OSTI)

The purpose of the Amarillo National Resource Center for Plutonium is to serve the Texas Panhandle, the State of Texas and the US Department of Energy by: conducting scientific and technical research; advising decision makers; and providing information on nuclear weapons materials and related environment, safety, health, and nonproliferation issues while building academic excellence in science and technology. This paper describes the electronic resource library which provides the national archives of technical, policy, historical, and educational information on plutonium. Research projects related to the following topics are described: Environmental restoration and protection; Safety and health; Waste management; Education; Training; Instrumentation development; Materials science; Plutonium processing and handling; and Storage.

NONE

1999-01-30T23:59:59.000Z

310

Resource Recovery and Management Act (Florida)  

Broader source: Energy.gov [DOE]

The Department of Environmental Protection administers the state solid and hazardous waste management programs. The programs aim to:...

311

Environmental Science and Resource Management Undergraduate Student Learning Objectives  

E-Print Network [OSTI]

Environmental Science and Resource Management Undergraduate Student Learning Objectives Students completing the B.S. in Environmental Science and Resource Management will have the following: KNOWLEDGE SETS and environmental ethics. · Understand application of ecosystem and social concepts along the urban to wildland

Anderson, Richard

312

Towards Interoperability of ISO Standards for Language Resource Management  

E-Print Network [OSTI]

Towards Interoperability of ISO Standards for Language Resource Management Kiyong Lee Korea.romary@loria.fr Abstract This paper reviews and evaluates some of the ISO documents for language resource management. Being developed under ISO/TC 37/SC 4, these documents are at the last stage of approval and publication as interna

Paris-Sud XI, Universit de

313

A Smart Energy System: Distributed Resource Management, Control and Optimization  

E-Print Network [OSTI]

A Smart Energy System: Distributed Resource Management, Control and Optimization Yong Ding, Student of distributed energy resource and consumption management, which proposes to design a networked and embedded platform for realizing a dynamic energy mix and optimizing the energy consumption dy- namically. Based

Beigl, Michael

314

NREL Webinar: Treatment of Solar Generation in Electric Utility Resource Planning  

Office of Energy Efficiency and Renewable Energy (EERE)

In this free webinar, you will hear how utilities are incorporating solar generation into their resource planning processes.

315

Civil Works Planning Overview Civil Works (CW) Planning offers a structured, rational approach to solving water resources  

E-Print Network [OSTI]

, the current design and construction program is largely a result of project authorizations. Planning); and several implementing policies. CW Planning is the start of the "pipeline" for addressing water resources

US Army Corps of Engineers

316

The Commission Forecast 1992 Report: Important Resource Planning Issues  

E-Print Network [OSTI]

-side management (DSM) programs, power plant life extension, purchased power from other utilities, and TABLE 4 Installed Capacity by Service Areas (MW) Utility 1991 Utility 2001 PUC 2001 TU Electric 19,928 HL&P 13,584 CPL 4,398 CPS 3,901 GSU 6... rate classes. 73 ESL-IE-92-04-12 Proceedings from the 14th National Industrial Energy Technology Conference, Houston, TX, April 22-23, 1992 PLANNING ISSUES The Commission staff predicts that present generating reserves, including plants under...

Adib, P.

317

Los Alamos National Laboratory emergency management plan. Revision 1  

SciTech Connect (OSTI)

The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

Ramsey, G.F.

1998-07-15T23:59:59.000Z

318

Numerical Analysis of Non-Constant Discounting with an Application to Renewable Resource Management  

E-Print Network [OSTI]

AND K. G. L OFGREN (2000): Renewable Resources and Economican Application to Renewable Resource Management Tomoki Fujiiwith an Application to Renewable Resource Management Tomoki

Fujii, Tomoki; Karp, Larry

2006-01-01T23:59:59.000Z

319

Managing Variable Energy Resources to Increase Renewable Electricity's  

E-Print Network [OSTI]

Managing Variable Energy Resources to Increase Renewable Electricity's Contribution to the Grid P o Contribution of Renewable Energy to Total Electricity Generation? 15 ManaGInG VaRIablE EnERGy REsouRCEs 16 What l i c y m a k e r G u i d e #12;Variable energy resources, such as wind power, now produce about 3

320

MANAGED OBJECT PATTERN Class Behavioral Provide direct control of individual resources in a managed system. The Managed Object  

E-Print Network [OSTI]

in a managed system. The Managed Object provides a one-to-one mapping to the manageable entities, as well system, in which case the Manager-Agent pattern might be more appropriate). #12;2 / 4 Structure management systems to learn about the contents of the MIB. · Managed Object - Represents a single resource

Keller, Rudolf K.

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

UW-Madison Records Management Public Records Campus Resources  

E-Print Network [OSTI]

UW-Madison Records Management Public Records Campus Resources Attached are some documents which website at: http://archives.library.wisc.edu/records/resource.html#tutorials PRB Memo on Social Media IT policies http://www.cio.wisc.edu/policies/ Appropriate Use of Information Technology Resources http

Sheridan, Jennifer

322

FY 1999 Spent Nuclear Fuel Interim Management Plan  

SciTech Connect (OSTI)

This document has been prepared to present in one place the near and long-term plans for safe management of SRS SNF inventories until final disposition has been identified and implemented.

Dupont, M.

1998-12-21T23:59:59.000Z

323

Economic and Hydrologic Implications of Proposed Edwards Aquifer Management Plans  

E-Print Network [OSTI]

, according to Texas water law, ground water is a property right vested with the land owner. Throughout at least the past two decades, attempts to negotiate voluntary management plans to restrict pumpage have been unsuccessful, even though demand is projected...

Dillon, Carl R.; Jones, Lonnie L.; Williams, R. Lynn; Jordan, Wayne R.; McCarl, Bruce A.

324

WIPP Facility Work Plan for Solid Waste Management Units  

SciTech Connect (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

325

Managing the Transition State for Energy Strategic Planning  

E-Print Network [OSTI]

MANAGING THE TRANSITION STATE FOR ENERGY STRATEGIC PLANNING a Thomas A. Koehler Eastman Kodak Company Rochester, New York ABSTRACT Corporate energy conservation programs have made substantial gains in reducing energy consumption during... the last decade. The responses to survive the mid-1970's global energy uncertainties were made in a crisis environment. Now, there is a transition from energy conservation to energy strategic planning. Energy engineers and managers need to im prove...

Koehler, T. A.

326

Knowledge and plan execution management in planning fire fighting operations  

E-Print Network [OSTI]

.dev@decsai.ugr.es Departmento de Ciencias de la Computaci´on e Inteligencia Artificial. E.T.S. Ingenieria Informatica] or civil [2] domains. These AI planning techniques are only the core of more complex architectures that may

Fernández Olivares, Juan

327

Program Academic Quality Plan Department of Construction Management  

E-Print Network [OSTI]

Program Academic Quality Plan Department of Construction Management Bowling Green State University://www.bgsu.edu/colleges/technology/undergraduate/cmt/index.html Integral in this effort is our Program Academic Quality Plan. I. Bowling Green State University Mission Bowling Green State University provides educational experiences inside and outside the classroom

Moore, Paul A.

328

Adaptive Resource Management Schemes for Web Services  

E-Print Network [OSTI]

are required. However, as the number of servers in web cluster systems increase, web cluster systems incur long and unpredictable delays to manage servers. This study presents the e?cient management schemes for web cluster systems. First of all, we propose an e... to the backend servers plays an important role in the overall system performance. In this study, we present a proactive request distribution (ProRD) to provide an intelligent distribution at the distributor. Second, we propose the heuristic memory management...

Lee, Heung Ki

2011-02-22T23:59:59.000Z

329

2012 Annual Planning Summary for Legacy Management  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

330

Finance and supply management project execution plan  

SciTech Connect (OSTI)

As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

BENNION, S.I.

1999-02-10T23:59:59.000Z

331

Managing Energy and Server Resources in Hosting Centers Jeffrey S. Chase, Darrell C. Anderson, Prachi N. Thakar, Amin M. Vahdat  

E-Print Network [OSTI]

of delivered performance. The system continuously moni- tors load and plans resource allotments by estimating bandwidth) to insulate its customers from demand surges and capital costs for excess capacity. HostingManaging Energy and Server Resources in Hosting Centers Jeffrey S. Chase, Darrell C. Anderson

Sirer, Emin Gun

332

DNFSB Recommendation 94-1 Hanford Site Integrated Stabilization Management Plan. Volume 2  

SciTech Connect (OSTI)

The Hanford Site Integrated Stabilization Management Plan (SISMP) was developed in support of the US Department of Energy`s (DOE) Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 Integrated Program Plan (IPP). Volume 1 of the SISMP identifies the technical scope and costs associated with Hanford Site plans to resolve concerns identified in DNFSB Recommendation 94-1. Volume 2 of the SISMP provides the Resource Loaded Integrated Schedules for Spent Nuclear Fuel Project and Plutonium Finishing Plant activities identified in Volume 1 of the SISMP. Appendix A provides the schedules and progress curves related to spent nuclear fuel management. Appendix B provides the schedules and progress curves related to plutonium-bearing material management. Appendix C provides programmatic logic diagrams that were referenced in Volume 1 of the SISMP.

Gerber, E.W.

1995-10-01T23:59:59.000Z

333

Risk Management Plan Electron Beam Ion Source Project  

E-Print Network [OSTI]

Risk Management Plan for the Electron Beam Ion Source Project (EBIS) Project # 06-SC-002 at Brookhaven National Laboratory Upton, NY For the U.S. Department of Energy Office of Science Office of Nuclear Physics (SC ­ 26) #12;1. Background and References 1.1 Background The EBIS Project will manage

334

RISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING  

E-Print Network [OSTI]

: 814-863-9958. Fax: 814-865-7846. In the pharmaceutical industry, the optimal management of the newRISK MANAGEMENT IN REAL OPTIONS BASED PHARMACEUTICAL PORTFOLIO PLANNING Michael J. Rogers, Anshuman incorporate a Monte Carlo simulation procedure to a stochastic optimization model (OptFolio) of pharmaceutical

Maranas, Costas

335

USDA / NRCS Waste Utilization Standard and Management Plans  

E-Print Network [OSTI]

)Waste Utilization Standard (633) Purposes Protect water quality. Provide fertility for crop, forageUSDA / NRCS Waste Utilization Standard and Management Plans Revised 7/05 Rick Leopold USDA / NRCS Bryan, TX #12;OutlineOutline Interactions with Nutrient Management Standard (590) Waste Utilization

Mukhtar, Saqib

336

CPP-603 Underwater Fuel Storage Facility Site Integrated Stabilization Management Plan (SISMP), Volume I  

SciTech Connect (OSTI)

The CPP-603 Underwater Fuel Storage Facility (UFSF) Site Integrated Stabilization Management Plan (SISMP) has been constructed to describe the activities required for the relocation of spent nuclear fuel (SNF) from the CPP-603 facility. These activities are the only Idaho National Engineering Laboratory (INEL) actions identified in the Implementation Plan developed to meet the requirements of the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1 to the Secretary of Energy regarding an improved schedule for remediation in the Defense Nuclear Facilities Complex. As described in the DNFSB Recommendation 94-1 Implementation Plan, issued February 28, 1995, an INEL Spent Nuclear Fuel Management Plan is currently under development to direct the placement of SNF currently in existing INEL facilities into interim storage, and to address the coordination of intrasite SNF movements with new receipts and intersite transfers that were identified in the DOE SNF Programmatic and INEL Environmental Restoration and Waste Management Environmental Impact Statement Record, of Decision. This SISMP will be a subset of the INEL Spent Nuclear Fuel Management Plan and the activities described are being coordinated with other INEL SNF management activities. The CPP-603 relocation activities have been assigned a high priority so that established milestones will be meet, but there will be some cases where other activities will take precedence in utilization of available resources. The Draft INEL Site Integrated Stabilization Management Plan (SISMP), INEL-94/0279, Draft Rev. 2, dated March 10, 1995, is being superseded by the INEL Spent Nuclear Fuel Management Plan and this CPP-603 specific SISMP.

Denney, R.D.

1995-10-01T23:59:59.000Z

337

2011-2015 Human Capital Management Plan  

Broader source: Energy.gov (indexed) [DOE]

to the American people. This (HCMP or Plan) shows how we intend to recruit, hire, train, develop, and retain such employees. Our differs from previous versions not only in...

338

Truthful resource management in wireless ad hoc networks  

E-Print Network [OSTI]

the truthful resource management that induces network nodes to reveal true information and stimulate cooperation. We propose the Transmission Power Recursive Auction Mechanism routing pro- tocol (TEAM) and the Truthful Topology Control mechanism (TRUECON...

Cai, Jianfeng

2005-11-01T23:59:59.000Z

339

SNES 2000: Environmental Sciences Colloquium Water Resource Management  

E-Print Network [OSTI]

SNES 2000: Environmental Sciences Colloquium Fall 2011 Water Resource Management Friday afternoons for first speaker September 9 The world water savings bank Mike Walter, Biological and Environmental, Biological and Environmental Engineering, Cornell University October 7 OPEN October 14 Water Quality

Keinan, Alon

340

Development of approaches to integrated water resources management  

E-Print Network [OSTI]

There is a growing need to manage water resources in a sustainable way, particularly in semi arid areas, with dramatic social and economic development as well as rapid population growth. Optimising water allocation in a ...

Geng, Guoting

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Office of Human Resources -Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT  

E-Print Network [OSTI]

the work of two (2) or more employees · Majority of time is spent directly managing people (i.e. over 50Office of Human Resources - Employment & Compensation 1 MANAGEMENT NON-MANAGEMENT Typically includes, but is not limited to activities such as: Manages direct reports where primary duty

Yener, Aylin

342

Total Quality Management: Managing the Human Dimension in Natural Resource Agencies1  

E-Print Network [OSTI]

Total Quality Management: Managing the Human Dimension in Natural Resource Agencies1 Denzil Verardo business is conducted in the public sector, and Total Quality Management (TQM) can be the avenue relationships within the DPR and make recommendations for change. Total Quality Management team practices were

Standiford, Richard B.

343

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314 [CANCELLED  

SciTech Connect (OSTI)

The W-314 configuration management (CM) plan describes the systems, processes and procedures for implementing CM.

MCGREW, D.L.

2001-01-12T23:59:59.000Z

344

SECTION 10 Table of Contents 10 Coeur d' Alene Subbasin Management Plan ...............................................2  

E-Print Network [OSTI]

and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can10-1 SECTION 10 ­ Table of Contents 10 Coeur d' Alene Subbasin Management Plan....................................................................................................................35 #12;10-2 10 Coeur d' Alene Subbasin Management Plan The Coeur d' Alene Subbasin Management Plan

345

SECTION 26 Table of Contents 26 Spokane Subbasin Management Plan .........................................................2  

E-Print Network [OSTI]

Work Teams and the process used to develop and adopt the management plan can be found in Section 126-1 SECTION 26 ­ Table of Contents 26 Spokane Subbasin Management Plan .........................................................................27 #12;26-2 26 Spokane Subbasin Management Plan The Spokane Subbasin Management Plan was developed

346

SECTION 18 Table of Contents 18 Pend Oreille Subbasin Management Plan....................................................2  

E-Print Network [OSTI]

of the Subbasin Work Teams and the process used to develop and adopt the management plan can be found in Section 118-1 SECTION 18 ­ Table of Contents 18 Pend Oreille Subbasin Management Plan;18-2 18 Pend Oreille Subbasin Management Plan The Pend Oreille Subbasin Management Plan was developed

347

SECTION 50 Table of Contents 50 Lake Rufus Woods Management Plan .........................................................2  

E-Print Network [OSTI]

and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can50-1 SECTION 50 ­ Table of Contents 50 Lake Rufus Woods Management Plan .........................................................................28 #12;50-2 50 Lake Rufus Woods Management Plan The Lake Rufus Woods Subbasin Management Plan

348

SECTION 34 Table of Contents 34 Upper Columbia Management Plan..............................................................2  

E-Print Network [OSTI]

and formation of the Subbasin Work Teams and the process used to develop and adopt the management plan can34-1 SECTION 34 ­ Table of Contents 34 Upper Columbia Management Plan .........................................................................25 #12;34-2 34 Upper Columbia Management Plan The Upper Columbia Subbasin Management Plan

349

SECTION 42 Table of Contents 42 San Poil Subbasin Management Plan ..........................................................2  

E-Print Network [OSTI]

of the Subbasin Work Teams and the process used to develop and adopt the management plan can be found in Section 142-1 SECTION 42 ­ Table of Contents 42 San Poil Subbasin Management Plan .........................................................................22 #12;42-2 42 San Poil Subbasin Management Plan The San Poil Subbasin Management Plan was developed

350

E-Print Network 3.0 - adaptive management plan Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: adaptive management plan Page: << < 1 2 3 4 5 > >> 1 Regional Water Management: Adapting to Uncertain Water Summary: & Implement Management Options Monitor &...

351

Idaho National Laboratory Cultural Resource Management Office FY 2010 Activity Report  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500 year span of human land use in the region. As a federal agency, the Department of Energy, Idaho Operations Office (DOE-ID) has legal responsibility for the management and protection of the resources and has contracted these responsibilities to Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts the challenge of preserving INL cultural resources in a manner reflecting their importance in local, regional, and national history. This report summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2010. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be informative to both internal and external stakeholders and to serve as a planning tool for future INL cultural resource management work.

Hollie K. Gilbert; Clayton F. Marler; Christina L. Olson; Brenda R. Pace; Julie Braun Williams

2011-09-01T23:59:59.000Z

352

Idaho National Laboratory Cultural Resource Management Office FY 2011 Activity Report  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) Site is home to vast numbers and a wide variety of important cultural resources representing at least a 13,500 year span of human land use in the region. As a federal agency, the Department of Energy, Idaho Operations Office (DOE-ID) has legal responsibility for the management and protection of the resources and has contracted these responsibilities to Battelle Energy Alliance (BEA). The BEA professional staff is committed to maintaining a cultural resource management program that accepts the challenge of preserving INL cultural resources in a manner reflecting their importance in local, regional, and national history. This report is intended as a stand-alone document that summarizes activities performed by the INL Cultural Resource Management Office (CRMO) staff during fiscal year 2011. This work is diverse, far-reaching and though generally confined to INL cultural resource compliance, also includes a myriad of professional and voluntary community activities. This document is intended to be informative to both internal and external stakeholders, serve as a planning tool for future INL cultural resource management work, and meet an agreed upon legal requirement.

Julie Braun Williams; Brenda R. Pace; Hollie K. Gilbert; Christina L. Olson

2012-09-01T23:59:59.000Z

353

Managing the earth's resources for today  

E-Print Network [OSTI]

involving TU Delft, Shell and TNO. This project was established for the purpose of boosting oil production by improving the flow of oil and water in oil reservoirs. TU Delft is also a participant in CATO, a consortium description and drilling techniques to field management and project economics. Reservoir Geology covers

Langendoen, Koen

354

Office of Resource Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen OwnedofDepartment ofJaredOakscience-based,OHAGasandSafety and SecurityResource

355

Project Management Plan (PMP) for International Atomic Energy Agency (IAEA) Safeguards Project  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the PFP IAEA project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP) HNF-3617 Rev 0.

BARTLETT, W.D.

1999-09-14T23:59:59.000Z

356

Stochastic Models and Analysis for Resource Management in Server Farms  

E-Print Network [OSTI]

farms. State-of-the-art servers come with multiple knobs to control energy consumption, but traditionalStochastic Models and Analysis for Resource Management in Server Farms Varun Gupta CMU-CS-11, Multi-server systems, Load balancing, Scheduling, M/G/k, Time-varying load, Energy management

357

EM Contributes Expertise to Comprehensive Resource on Managing Nuclear Projects  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. EM officials wrote a chapter of a recently published book, Managing Nuclear Projects A Comprehensive Management Resource, which covers a range of areas with emphasis on process, requirements and lessons learned. Authors from France, Germany, Argentina, Belgium, Finland, Austria, and the U.S. contributed to the book.

358

Water resources planning under climate change and variability  

E-Print Network [OSTI]

Water Reserves. Journal of Environmental Economics and ManagementWater Systems. Journal of Environmental Economics and ManagementWater Reserves. Journal of Environmental Economics and Management

O'Hara, Jeffrey Keith

2007-01-01T23:59:59.000Z

359

Water resources planning under climate change and variability  

E-Print Network [OSTI]

transfers or options. Demand-side management includes thepricing schemes, and demand-side management for urban water,of alternate demand side management, particularly

O'Hara, Jeffrey Keith

2007-01-01T23:59:59.000Z

360

DRAFT MANAGEMENT PLAN APPENDIX A-1 Contract Entities and Plan Participants  

E-Print Network [OSTI]

Province (USP) Plan in addition to those contracted by the Northwest Power and Conservation Council (NPCC of three primary elements: Part I. An Assessment of the current and potential physical and biological AND PLAN PARTICIPANTS BOI043620001.DOC/KG A1-2 IDFG organized a technical team of natural resource

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

"Modeling for effective and sustainable water resources management."  

E-Print Network [OSTI]

"Modeling for effective and sustainable water resources management." Teresa Culver Associate Professor tculver@virginia.edu ce.virginia.edu/faculty/culvert.html Dept. of Civil & Environmental Engineering University of Virginia Charlottesville, VA 434.982.6375 Environmental & Water Resources Group We

Acton, Scott

362

ORISE: National Security and Emergency Management Resources  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACK MappingHistory The OakMentor

363

Final Project Plan/Project Management Plan, January 1995.  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '* FEB1f\l p :.;LIST OF ACRONYMS

364

Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site  

SciTech Connect (OSTI)

The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan.

C. A. Wills

2001-03-01T23:59:59.000Z

365

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network [OSTI]

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Park Management ­ Bachelor of Science [EH

Sheridan, Scott

366

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management  

E-Print Network [OSTI]

SUGGESTED THREE-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation-YEAR GRADUATION PLAN Roadmap: Recreation, Park and Tourism Management ­ Recreation Management ­ Bachelor

Sheridan, Scott

367

Project management plan for Project W-320, Tank 241-C-106 sluicing  

SciTech Connect (OSTI)

This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987).

Phillips, D.R.

1994-12-01T23:59:59.000Z

368

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network [OSTI]

2015 Performance Plan, starting with the currently reported year of FY 2013 and spanning backward from FY 2008 to FY 2012, go to http://www.nasa.gov/about/budget/PAR_Reports.html. The combined report 2014 and/or FY 2015. The performance goal summary is followed by: · The annual performance indicators

Waliser, Duane E.

369

Disruption Management ( Operations Research between planning ...  

E-Print Network [OSTI]

In ship-building , production plans usually allo w some fl exibility. ... creasing the cost of production gives rise to an increased demand for robustness in ..... H o w ever , from the passenger side it is the w orst option , since a group of customers.

370

Oak Ridge National Laboratory Waste Management Plan. Revision 1  

SciTech Connect (OSTI)

The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

Not Available

1991-12-01T23:59:59.000Z

371

Vehicle Technologies Office: Resources for Sustainability Managers |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudha Patri Mechanicalof Energy

372

Deputy Director for Resource Management Staff Jobs  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 Industrial CarbonArticles News(SC) CCIScattering | U.S. DOE OfficeHome

373

Project Management Resources | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil'sofAppendix B, SeptemberandID Project Name FYProject

374

DOE Human Resources Management Division - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformationCenterResearchCASLNanoporousTestimonyContactWebsite AdministratorSite map

375

Environmental Resources Management ERM | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It isInformation ContractsCGNPC JVEnvergyInformationERM Jump to:

376

Environmental Studies and Planning Page 135Sonoma State University 2014-2015 Catalog ENVIRONMENTAL STUDIES AND PLANNING  

E-Print Network [OSTI]

and Restoration, Water Resources Management Programs Offered Bachelor of Arts in Environmental Studies Education Concentration Water Resources Management Bachelor of Science in Environmental Studies Energy Management and Design Water Resources Management Minor in Environmental Studies and Planning Elementary Teacher

Ravikumar, B.

377

Emergency Management: Facility Emergency Plan Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West Other SLAC Resources SLAC Site

378

Emergency Management: Facility Emergency Plan Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West Other SLAC Resources SLAC

379

Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies  

E-Print Network [OSTI]

Goal.6 Figure 2-2. Accounting for Energy Efficiency2-3. Accounting for Energy Efficiency Resources in LoadFigure 3-1. Plan Energy Efficiency Program Effects: Annual

Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

2006-01-01T23:59:59.000Z

380

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR 264.90 through 264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] 6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

NEW - DOE O 350.1 Chg 5, Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

382

Introducing the use of integrated Decision Support System in Natural Resources Planning  

E-Print Network [OSTI]

The target subject of Natural Resources Planning (NRP) includes various systems and their elements, all of which are centered around the natural resource system. Given this characteristic complexity and a high degree of ...

Park, Hye Yeon, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

383

Strategic Planning -College -Agricultural Sciences & Natural Resources Unit Assessment Report -Four Column  

E-Print Network [OSTI]

Strategic Planning - College - Agricultural Sciences & Natural Resources Unit Assessment Report - Four Column Texas Tech University Priorities Means of Assessment & Criteria / Tasks Results Action & Natural Resources - 2013 Priority 1_Increase Enrollment and Promote Student Success (CASNR - Outcome 1

Zhang, Yuanlin

384

Technical assistance contractor Management Plan. Final [report  

SciTech Connect (OSTI)

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

Not Available

1993-09-01T23:59:59.000Z

385

Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.  

SciTech Connect (OSTI)

This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.

Childs, Allen B.

2002-02-01T23:59:59.000Z

386

Conference Topic: Integrated Water Resources and Coastal Areas Management National Water Information Systems: A Tool to Support Integrated Water Resources  

E-Print Network [OSTI]

Conference Topic: Integrated Water Resources and Coastal Areas Management National Water Information Systems: A Tool to Support Integrated Water Resources Management in the Caribbean Marie-Claire St of Integrated Water Resources Management (IWRM) in the Caribbean and to address the problems

Barthelat, Francois

387

Emergency Management: Facility Emergency Plan Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for

388

Software Configuration Management Plan | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOEEnergy Smooth Brome Monitoring

389

Suggested Elements for a Data Management Plan | U.S. DOE Office...  

Office of Science (SC) Website

management of the research data including plans to reevaluate the costs and benefits of data sharing and preservation. Protection. A statement of plans, where appropriate and...

390

Apparatus and method for managing digital resources by passing digital resource tokens between queues  

DOE Patents [OSTI]

A method of managing digital resources of a digital system includes the step of reserving token values for certain digital resources in the digital system. A selected token value in a free-buffer-queue is then matched to an incoming digital resource request. The selected token value is then moved to a valid-request-queue. The selected token is subsequently removed from the valid-request-queue to allow a digital agent in the digital system to process the incoming digital resource request associated with the selected token. Thereafter, the selected token is returned to the free-buffer-queue. 6 figs.

Crawford, H.J.; Lindenstruth, V.

1999-06-29T23:59:59.000Z

391

Apparatus and method for managing digital resources by passing digital resource tokens between queues  

DOE Patents [OSTI]

A method of managing digital resources of a digital system includes the step of reserving token values for certain digital resources in the digital system. A selected token value in a free-buffer-queue is then matched to an incoming digital resource request. The selected token value is then moved to a valid-request-queue. The selected token is subsequently removed from the valid-request-queue to allow a digital agent in the digital system to process the incoming digital resource request associated with the selected token. Thereafter, the selected token is returned to the free-buffer-queue.

Crawford, Henry J. (Berkeley, CA); Lindenstruth, Volker (El Cerrito, CA)

1999-01-01T23:59:59.000Z

392

Integrated safeguards and security management plan  

SciTech Connect (OSTI)

Berkeley Lab is committed to scientific excellence and stewardship of its assets. While security principles apply to all work performed at the Laboratory, their implementation is flexible. Berkeley Lab adheres to the following principles: Line management owns security; Security roles and responsibilities are clearly defined and communicated; Security functions are integrated; An open environment supports the Laboratory's Mission; The security program must support the scientific and operational missions of the Laboratory and must be value added; and Security controls are tailored to individual and facility requirements.

Bowen, Sue, editor

2001-04-16T23:59:59.000Z

393

LFRG Program Management Plan | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiatives Initiatives ThroughEnergy Kicking the OilEffort

394

Contract Management Plan Outline | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract

395

LPP Risk Management Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOEWashington,LM-04-XXXX Office of Legacy6LOANLPP Risk

396

ARM - Data Management and Documentation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformationbudapest Comments? We would love toContact Information Related LinksDailyJuly 22,

397

LFRG Program Management Plan (LFRG PMP)  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | DepartmentEnergy Invitation toDepartment ofofD C 20585 MEMORANDUM

398

Project Management Plan - Small Producers Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProjectProjectProjectRPSEA

399

Mississippi Water Resources Research Institute Annual Technical Report  

E-Print Network [OSTI]

include: water quality, surface and groundwater management, water quality management and water resources Category: Water Quality Focus Category: Wetlands, Water Quality, Management and Planning Descriptors; to assist state agencies in the development and maintenance of a state water management plan

400

Appropriate Technologies and Systems to respond to Climate Change, Improved Water Resources Management, Waste Management and Sanitation  

E-Print Network [OSTI]

Resources Management, Waste Management and Sanitation A Review of Water Information Systems in the English to adequately manage the resource and institute measures to equitably allocate water among the various competing in the management of the resource. This paper examines the water information systems of St. Lucia, Jamaica

Barthelat, Francois

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

adaptive management tool: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management as an alternative to traditional natural resource planning and management models. Adaptive management may provide BLM managers ... Brandenburg, Peter (Peter J.)...

402

Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect (OSTI)

The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

NSTec Environmental Management

2008-09-01T23:59:59.000Z

403

Hanford Site waste management and environmental restoration integration plan  

SciTech Connect (OSTI)

The Hanford Site Waste Management and Environmental Restoration Integration Plan'' describes major actions leading to waste disposal and site remediation. The primary purpose of this document is to provide a management tool for use by executives who need to quickly comprehend the waste management and environmental restoration programs. The Waste Management and Environmental Restoration Programs have been divided into missions. Waste Management consists of five missions: double-shell tank (DST) wastes; single-shell tank (SST) wastes (surveillance and interim storage, stabilization, and isolation); encapsulated cesium and strontium; solid wastes; and liquid effluents. Environmental Restoration consists of two missions: past practice units (PPU) (including characterization and assessment of SST wastes) and surplus facilities. For convenience, both aspects of SST wastes are discussed in one place. A general category of supporting activities is also included. 20 refs., 14 figs., 7 tabs.

Merrick, D.L.

1990-04-30T23:59:59.000Z

404

University of Glasgow Carbon Management Programme Carbon Management Plan working with  

E-Print Network [OSTI]

carbon vision 11 2.3 Strategic themes 12 Targets and objectives 13 3 Emissions Baseline and Projections. Professor Anton Muscatelli, Principal Foreword from the Carbon Trust Cutting carbon emissions as partUniversity of Glasgow Carbon Management Programme Carbon Management Plan working with Page 1 Carbon

Mottram, Nigel

405

GIS IN LAND RESOURCE MANAGEMENT Distance Education Section  

E-Print Network [OSTI]

: In this course you will gain ample hands-on experience in using ArcGIS and geospatial analysis using real information system (GIS) and geospatial methods as applied to land resource management issues. GOOD TO KNOW projects and find solutions to geospatial problems. OTHER INFORMATION: The course counts towards the ICGIS

Ma, Lena

406

Managing Network Resources in Condor Jim Basney and Miron Livny  

E-Print Network [OSTI]

usage in Condor. By managing network resources, these mechanisms provide administrative control over administrative network policies and to ensure that applications receive sufficient network capac- ity to compute provide statistics to the Condor administrator about how Condor ap- plications are using the network

Wisconsin at Madison, University of

407

Managing Network Resources in Condor Jim Basney and Miron Livny  

E-Print Network [OSTI]

usage in Condor. By managing network resources, these mechanisms provide administrative control over administrative network policies and to ensure that applications receive sufficient network capac ity to compute provide statistics to the Condor administrator about how Condor ap plications are using the network

Wisconsin at Madison, University of

408

Tools of the Job Queries, Reports, Resources Account Management  

E-Print Network [OSTI]

Tools of the Job ­ Queries, Reports, Resources Account Management The minimum required review trans detail, Ledger, grants award, and Invoice tables. The invoice tables are used by the dean's office of a grant or contract such as the chartstring, begin date, end date, sponsor, etc. The ledger data contains

409

Museum-on-Demand: Dynamic management of resources  

E-Print Network [OSTI]

1 Museum-on-Demand: Dynamic management of resources in World Wide Web museums Fabrizio Furano: Given the problem of building virtual museums, this paper discusses the tasks of retrieving, assembling. A virtual museum construction approach is pre- sented, in which a comprehensive database and a complex

Celentano, Augusto

410

Data for Planning and Evaluation DEPARTMENT =150201 Parks Recreation and Tourism Management  

E-Print Network [OSTI]

Data for Planning and Evaluation DEPARTMENT =150201 Parks Recreation and Tourism Management Degrees N 103 79 89 111 13 #12;DEPARTMENT =150201 Parks Recreation and Tourism Management State

411

SAPHIRE 8 Software Configuration Management Plan  

SciTech Connect (OSTI)

The INL software developers use version control for both the formally released SAPHIRE versions, as well as for source code. For each formal release of the software, the developers perform an acceptance test: the software must pass a suite of automated tests prior to official release. Each official release of SAPHIRE is assigned a unique version identifier. The release is bundled into a standard installation package for easy and consistent set-up by individual users. Included in the release is a list of bug fixes and new features for the current release, as well as a history of those items for past releases. Each formal release of SAPHIRE will have passed an acceptance test. In addition to assignment of a unique version identifier for an official software release, each source code file is kept in a controlled library. Source code is a collection of all the computer instructions written by developers to create the finished product. The library is kept on a server, where back-ups are regularly made. This document describes the configuration management approach used as part of the SAPHIRE development.

Curtis Smith

2010-01-01T23:59:59.000Z

412

Waste Isolation Pilot Plant land management plan  

SciTech Connect (OSTI)

On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

NONE

1996-05-01T23:59:59.000Z

413

Water resources planning under climate change and variability  

E-Print Network [OSTI]

Environmental Economics and Management 34:207-227 Griffin RC, Mjelde JW (2000) Valuing WaterEnvironmental Economics and Management 40:37-55 Riley JG, Scherer CR (1979) Optimal WaterEnvironmental Economics and Management 26:19-30 Loucks DP, Stedinger JR, Haith DA (1981) Water

O'Hara, Jeffrey Keith

2007-01-01T23:59:59.000Z

414

Director Human Resources Assoc Director  

E-Print Network [OSTI]

Director ­ Human Resources Assoc Director Workforce Planning & Organisational Change Director) - Organisational change - Workforce planning - Grievance & performance mgt support - Performance management line and not a formal Branch ** Includes Classifications ANU Search Workforce Planning* Remunerations

Botea, Adi

415

Fluid management plan for the Project Shoal Area Offsites Subproject  

SciTech Connect (OSTI)

The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject`s Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria.

NONE

1996-08-01T23:59:59.000Z

416

Rangeland Resource Management for Texans: Why are Goals Important for Natural Resource Management? (Spanish)  

E-Print Network [OSTI]

intent? de nuevo? ?Qu? tienen que ver las preguntas anteriores con los pastizales y el manejo de recursos naturales? La funci?n principal de la administraci?n es identificar las metas (necesidades), desarrollar un plan, implementar el plan, asignar los... recursos y las actividades y alcanzar las metas. Para el propietario de un rancho, las ?necesidades? de mayor prioridad podr?an ser evitar la bancarrota durante el presente a?o, aumentar el patrimonio neto, mejorar los recursos del pastizal, los animales...

White, Larry D.; Fox, William E.

2005-02-17T23:59:59.000Z

417

Long-range master plan for defense transuranic waste management  

SciTech Connect (OSTI)

The Long Range Master Plan for the Defense Transuranic Waste Program (DTWP), or ''Master Plan,'' details current TRU waste management plans and serves as a framework for the DTWP. Not all final decisions concerning activities presented in the Master Plan have been made (e.g., land withdrawal legislation, the WIPP Compliance and Operational Plan and the TRUPACT Certificate of Compliance). It is the goal of the DTWP to end interim storage and achieve permanent disposal of TRU waste. To accomplish this goal, as much TRU waste as possible will be certified to meet the WIPP Acceptance Criteria (WAC). The certified waste will then be disposed of at WIPP. The small quantity of waste which is not practical to certify will be disposed of via alternative methods that require DOE Headquarters approval and shall comply with the National Environmental Policy Act requirements and EPA/State Regulations. The definition of TRU waste is ''without regard to source or form, waste that is contaminated with alpha-emitting transuranium radionuclides with half-lives greater than 20 years and concentrations greater than 100 nanocuries/gram (nCi/g) at the time of assay. Heads of Field Elements can determine that other alpha contaminated wastes, peculiar to a specific site, must be managed as transuranic waste.''

Not Available

1988-12-01T23:59:59.000Z

418

NYPA, Entergy begin nuclear management services plan  

SciTech Connect (OSTI)

The New York Power Authority (NYPA) and Entergy Corp. of New Orleans, La., announced recently the signing of a memorandum of understanding as a step toward a contract for Entergy to provide management services to NYPA`s two nuclear power plants. The agreement is the first of its kind. NYPA is the nation`s largest state-owned electric utility and supplier of one-quarter of New York`s electricity. Its nuclear plants are Indian Point 3 (IP3) in Buchanan, Westchester County, and James A. FitzPatrick in Scriba, Oswego County. Entergy is a utility holding company and its subsidiary, Entergy Operations Inc., is widely recognized as one of the leading nuclear operators in the United States. {open_quotes}NYPA`s nuclear plants are assets that belong to the people of New York,{close_quotes} said C.D. {open_quotes}Rapp{close_quotes} Rappleyea, NYPA`s chairman and CEO. {open_quotes}Our alliance with Entergy can provide the people of this state with added assurance that these plants will operate with the highest level of safety and efficiency.{close_quotes} FitzPatrick, an 800 MW boiling water reactor, has operated since 1975 and IP3, a 980 MW pressurized water reactor, since 1976. Although both are currently running well, they have had problems in recent years, and IP3 is on the US Nuclear Regulatory Commission`s (NRC) list of plants requiring increased regulatory attention. Entergy operated both types of reactors, has three single-unit sites like NYPA`s and is experienced in operating plants for different utility owners.

NONE

1996-10-01T23:59:59.000Z

419

Advanced Hybrid Particulate Collector Project Management Plan  

SciTech Connect (OSTI)

As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

Miller, S.J.

1995-11-01T23:59:59.000Z

420

Best Management Practice #1: Water Management Planning | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: ScopeDepartment ofEnergyBeowawe BinaryEnergy 1: Water

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

422

SPORT MANAGEMENT, RECREATION, AND TOURISM TOURISM, LEISURE, AND EVENT PLANNING (TLEP) MAJOR  

E-Print Network [OSTI]

1 SPORT MANAGEMENT, RECREATION, AND TOURISM DIVISION TOURISM, LEISURE, AND EVENT PLANNING (TLEP...................................................................................................................23 Examples of Tourism Field Experie

Moore, Paul A.

423

Rangeland Resource Management for Texans: Why are Goals Important for Natural Resource Management?  

E-Print Network [OSTI]

. Goals and objectives need to be SMART?S (spe- cific), M (measurable), A (attainable), R (related) and T (trackable). SMART goals establish priorities for allocating limited resources from an ecological, economic and socio- political perspective. Long...

White, Larry D.; Fox, William E.

2002-04-29T23:59:59.000Z

424

Plan for Quality Management 2007-2010 THE UNIVERSITY OF GOTHENBURG  

E-Print Network [OSTI]

Plan for Quality Management 2007-2010 THE UNIVERSITY OF GOTHENBURG Contents Preface 4 Purpose 5 Points of Departure 6 Specific Activities during 2007-2010 8 PREFACE This plan for quality management. In the plan, significant principles for quality management are described, as are a number of specific

Johannesson, Henrik

425

Integrated Waste Treatment Unit GFSI Risk Management Plan  

SciTech Connect (OSTI)

This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

W. A. Owca

2007-06-21T23:59:59.000Z

426

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect (OSTI)

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

427

FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT MEASURES FOR FLOOD MANAGEMENT SYSTEMS1  

E-Print Network [OSTI]

FLEXIBILITY IN WATER RESOURCES MANAGEMENT: REVIEW OF CONCEPTS AND DEVELOPMENT OF ASSESSMENT variability/change; risk assessment; flood management; water resources flexibility.) DiFrancesco, Kara N of Assessment Measures for Flood Management Systems. Journal of the American Water Resources Association (JAWRA

Tullos, Desiree

428

Management and Development of the Western Resources Project  

SciTech Connect (OSTI)

The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

Terry Brown

2009-03-09T23:59:59.000Z

429

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect (OSTI)

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

430

Westinghouse Hanford Company FY 1995 Materials Management Plan (MMP)  

SciTech Connect (OSTI)

The safe and sound operation of facilities and storage of nuclear material are top priorities within Hanford`s environmental management, site restoration mission. The projected materials estimates, based on the Materials Management Plan (MMP) assumptions outlined below, were prepared for Department of Energy (DOE) use in long-range planning. The Hanford MMP covers the period FY 1995 through FY 2005, as directed by DOE. All DOE Richland Operations (RL) Office facilities are essentially funded by the Office of Transition and Facilities Management, Environmental Restoration and Waste Management (EM). These facilities include PUREX, the UO{sub 3} plant, N-Reactor, T-Plant, K-Basins, FFTF, PFP and the 300 Area Fuel Fabrication facilities. Currently DP provides partial funding for the latter two facilities. Beginning in FY 1996 (in accordance with DOE-HQ MMP assumptions), EM will fund expenses related to the storage, monitoring, and safeguarding of all Special Nuclear Material (SNM) in the PFP. Ownership and costs related to movement and/or stabilization of that material will belong to EM programs (excluding NE material). It is also assumed that IAEA will take over inventory validation and surveillance of EM owned SNM at this time (FY 1996).

Higginson, M.C.

1994-10-01T23:59:59.000Z

431

Legacy Management CERCLA Sites. Quality Assurance Project Plan  

SciTech Connect (OSTI)

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

None

2007-05-03T23:59:59.000Z

432

Course helps professionals develop watershed protection plans: Texas water resources professionals gather  

E-Print Network [OSTI]

tx H2O | pg. 6 Story by Ric Jensen Course helps professionals develop watershed protection plans | pg. 6 tx H2O | pg. 7 W ater resources professionals wanting training on watershed protection plan development are benefiting from a course... AgriLife Research, the River Systems Institute at Texas State University, Texas Institute for Applied Environmental Research at Tarleton State University, and the U.S. Environmental Protection Agency (EPA) to create the Texas Watershed Planning...

Jensen, Ric

2008-01-01T23:59:59.000Z

433

Modelling Planning and Scheduling Problems with Time and Resources* ROMAN BARTK  

E-Print Network [OSTI]

Modelling Planning and Scheduling Problems with Time and Resources* ROMAN BARTÁK Department of sequencing operators to achieve some goal. In STRIPS- like planning, the operator is defined by pre-conditions and effects, i.e., the pre-conditions must be satisfied to use the operator, and the effects hold after using

Bartak, Roman

434

EFCOG Integrated Safety Management Work Planning and Control | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE ZeroThreeEnergy DrivingD EERE Program ManagementEERE4of Energy

435

Obtaining and Ensuring Persistence of O&M Savings Through Resource Conservation Management  

E-Print Network [OSTI]

OBTAINING AND ENSURING PERSISTENCE OF O&M SAVINGS THROUGH RESOURCE CONSERVATION MANAGEMENT WILL MILLER ASSOCIATE DIRECTOR ? TECHNICAL SERVICES PORTLAND ENERGY CONSERVATION, INC. (PECI) PORTLAND, OREGON ABSTRACT Resource conservation management is a...

Miller, W.

2001-01-01T23:59:59.000Z

436

PUREX/UO{sub 3} deactivation project management plan  

SciTech Connect (OSTI)

From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

Washenfelder, D.J.

1993-12-01T23:59:59.000Z

437

Systems Approaches and CommunitySystems Approaches and Community Approaches for Coastal PlanningApproaches for Coastal Planning  

E-Print Network [OSTI]

and Communities · Social/Economic/Cultural Environment · The Resource Management System: · Policy and Planning · Integrated Coastal Management · Development and Research #12;External Environment Policy and Planning Resource Management Resource Development Resource Research NATURAL ECOSYSTEM Community MANAGEMENT SYSTEM

Charles, Anthony

438

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

439

Planning vs. dynamic control: Resource allocation in corporate clouds  

E-Print Network [OSTI]

of the total op- erational costs of data centers [2]. It is predicted to reach around 4.5 percent of the whole in a static way such that energy costs are minimized. Live migration technology allows for dynamic resource utilization and fewer active servers. Overall, active servers are the main energy consumer · A. Wolke and M

Cengarle, María Victoria

440

Information Resources Management Strategic Plan Appendix FY2014...  

Office of Environmental Management (EM)

develop a governance model that provides a forum for discussing and adjudicating corporate requirements, policies, and standards. The resulting IT governance board will...

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Rangeland Resource Management for Texans: Strategic Planning for Success (Spanish)  

E-Print Network [OSTI]

podr? relacionar con otras metas siempre y cuando no haya otras metas contradicto- rias. Y puede rastrearse porque las UA por a?o anuales se pueden medir cada a?o para ver si se est? cumpliendo la meta. Considerando el Ambiente Cuando haya establecido... brecha se puede cerrar, quiz?s por medio de expansi?n o diversificaci?n, el siguiente paso es desarrollar estrategias ade- cuadas para alcanzar las metas. Este es el nivel de planeaci?n en donde se toman las decisiones operativas diarias. No hay estrate...

Fox, William E.

2004-12-22T23:59:59.000Z

442

Civilian radioactive waste management program plan. Revision 2  

SciTech Connect (OSTI)

This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

NONE

1998-07-01T23:59:59.000Z

443

Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan  

SciTech Connect (OSTI)

The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

Early, T.O.

1994-05-01T23:59:59.000Z

444

Drought and Precipitation Monitoring for Enhanced Integrated Water Resources Management in the Caribbean  

E-Print Network [OSTI]

Drought and Precipitation Monitoring for Enhanced Integrated Water Resources Management for water resource management in Jamaica, Grenada and Guyana. A key element to ensuring the success for Water Resources Management, McGill University, Macdonald Campus, 21111 Lakeshore Rd., Ste. Anne de

Barthelat, Francois

445

Pottebaum et al. Event Definition for Intelligent Resource Management Event Definition for the Application of Event  

E-Print Network [OSTI]

of resource management (use case and demand side) and event processing (technology and supply side). MethodsPottebaum et al. Event Definition for Intelligent Resource Management Event Definition for the Application of Event Processing to Intelligent Resource Management Jens Pottebaum University of Paderborn, C

Paliouras, George

446

Management and overview Quality Assurance Program Plan. Revision 2  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

Not Available

1986-08-01T23:59:59.000Z

447

National ignition facility environment, safety, and health management plan  

SciTech Connect (OSTI)

The ES&H Management Plan describes all of the environmental, safety, and health evaluations and reviews that must be carried out in support of the implementation of the National Ignition Facility (NIF) Project. It describes the policy, organizational responsibilities and interfaces, activities, and ES&H documents that will be prepared by the Laboratory Project Office for the DOE. The only activity not described is the preparation of the NIF Project Specific Assessment (PSA), which is to be incorporated into the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (PEIS). This PSA is being prepared by Argonne National Laboratory (ANL) with input from the Laboratory participants. As the independent NEPA document preparers ANL is directly contracted by the DOE, and its deliverables and schedule are agreed to separately with DOE/OAK.

NONE

1995-11-01T23:59:59.000Z

448

Colorado Division of Water Resources Substitute Water Supply Plans Webpage  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreisVolcanicPowerRaft River 5 MWCommission| Open Energy

449

Resource planning for gas utilities: Using a model to analyze pivotal issues  

SciTech Connect (OSTI)

With the advent of wellhead price decontrols that began in the late 1970s and the development of open access pipelines in the 1980s and 90s, gas local distribution companies (LDCs) now have increased responsibility for their gas supplies and face an increasingly complex array of supply and capacity choices. Heretofore this responsibility had been share with the interstate pipelines that provide bundled firm gas supplies. Moreover, gas supply an deliverability (capacity) options have multiplied as the pipeline network becomes increasing interconnected and as new storage projects are developed. There is now a fully-functioning financial market for commodity price hedging instruments and, on interstate Pipelines, secondary market (called capacity release) now exists. As a result of these changes in the natural gas industry, interest in resource planning and computer modeling tools for LDCs is increasing. Although in some ways the planning time horizon has become shorter for the gas LDC, the responsibility conferred to the LDC and complexity of the planning problem has increased. We examine current gas resource planning issues in the wake of the Federal Energy Regulatory Commission`s (FERC) Order 636. Our goal is twofold: (1) to illustrate the types of resource planning methods and models used in the industry and (2) to illustrate some of the key tradeoffs among types of resources, reliability, and system costs. To assist us, we utilize a commercially-available dispatch and resource planning model and examine four types of resource planning problems: the evaluation of new storage resources, the evaluation of buyback contracts, the computation of avoided costs, and the optimal tradeoff between reliability and system costs. To make the illustration of methods meaningful yet tractable, we developed a prototype LDC and used it for the majority of our analysis.

Busch, J.F.; Comnes, G.A.

1995-11-01T23:59:59.000Z

450

Natural and Cultural Resources 6 2007 Site environmental report6-  

E-Print Network [OSTI]

a Natural Resource Management Plan (NRMP) (BNL 2003a). The NRMP describes the program strategy, ele- ments, and planned activities for managing the various resources found on site. 6.1.1 IdentificationandMapping An understanding of an environmental baseline is the foundation of natural resource management planning. BNL uses

451

Environmental Management and Planning Solutions, Inc | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It isInformation ContractsCGNPC JVEnvergyInformation Planning

452

Project management plan for project W-320, tank 241-C-106 sluicing  

SciTech Connect (OSTI)

This Project Management Plan establishes the organization, plans, and systems for management of Project W-320 as defined in DOE Order 4700.1, Project Management System (DOE 1987). The sluicing is for retrieving high-heat waste from single shell tank 241-C-106.

Leliefeld, K.W.

1996-02-02T23:59:59.000Z

453

Configuration Management Plan for Tank Farm Restoration and Safe Operations Project W-314  

SciTech Connect (OSTI)

The Configuration Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable configuration management practices described in HNF-0842, Volume 111, Section 3.1, ''Configuration Management Implementation''. This plan is tailored specifically for use by Project W-314.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

454

Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314  

SciTech Connect (OSTI)

The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

MCGREW, D.L.

2000-04-19T23:59:59.000Z

455

Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological  

E-Print Network [OSTI]

.....................................................................................................................................................1 Transition to Electronic Data ManagementQuality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey;#12;Quality-Assurance and Data Management Plan for Groundwater Activities by the U.S. Geological Survey

456

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect (OSTI)

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

457

Protection of Forest Resources (Montana)  

Broader source: Energy.gov [DOE]

This statute addresses the conservation and protection of forest resources by encouraging the use of land management best practices pertaining to soil erosion, timber sale planning, associated road...

458

Quality Work Plan Checklist and Resources - Section 1  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.Department ofchecklistpurposeVersion) |

459

Quality Work Plan Checklist and Resources - Section 2  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.Department ofchecklistpurposeVersion) |

460

Quality Work Plan Checklist and Resources - Section 3  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.Department ofchecklistpurposeVersion) |

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Quality Work Plan Checklist and Resources - Section 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol.Department ofchecklistpurposeVersion) |

462

Fact Sheet - Renewable Resource Integration Action Plan - June 20, 2006  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicy andExsolutionFES6FYRANDOM DRUG TESTING TheMay 2012 BIn August,On

463

Energy Efficiency in Western Utility Resource Plans Implications for  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program -Department oftoThese Web sitesEERE Technologies for Alaska Day

464

Alaska Department of Natural Resources Land Use Planning Webpage | Open  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasil JumpAerowattOpen2008District No 3formPermitsEnergy

465

Alaska Department of Natural Resources Land Use Plans | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWaterBrasil JumpAerowattOpen2008District No

466

E-Print Network 3.0 - annual performance plan Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Name: Management Major: BS BBA BA MANAGEMENT, ENTREPRENEURIAL... of strategic management, workforce planning and employment, human resource development, compensation Source: Boise...

467

Graduate Assessment Strategies 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The  

E-Print Network [OSTI]

Graduate Assessment Strategies Resources: 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The graduate level assessment plans from OSU may be particularly helpful: http://oregonstate.edu/admin/aa/apaa/assessment/graduate-assessment/graduate- assessment-plans 2. A list of best practices is online at http://inside.mines.edu/UserFiles/File/Assessment

468

Clemson University Preservation master Plan February 2009 JMa, Inc. Iv  

E-Print Network [OSTI]

survey and incorporating cultural landscapes as key resources Integrating preservation management Plan will assist Clemson University in its historic resource stewardship by augmenting and complementing existing campus planning and facilities documents by: Updating the existing historic resource

Duchowski, Andrew T.

469

Rangeland Drought Management for Texans: Planning: The Key to Surviving Drought  

E-Print Network [OSTI]

This publication outlines the steps that ranchers should take to survive a drought. Those steps include developing a plan for each enterprise of the operation, ranking strategic ranch goals, planning for resource flow, implementing and monitoring...

Hart, Charles R.; Carpenter, Bruce B.

2001-05-02T23:59:59.000Z

470

Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Broader source: Energy.gov [DOE]

The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

471

Creating an urban deer-vehicle accident management plan using information from a town's GIS project  

E-Print Network [OSTI]

AN URBAN DEER-VEHICLE ACCIDENT MANAGEMENT PLAN USINGincrease in deer vehicle accidents. Given the Town'sof increased deer vehicle accidents which, in the past 10

Premo, Dean B.; Rogers, Elizabeth I.

2001-01-01T23:59:59.000Z

472

Balancing Cost and Risk: The Treatment of Renewable Energy in Western Utility Resource Plans  

SciTech Connect (OSTI)

Markets for renewable energy have historically been motivated primarily by policy efforts, but a less widely recognized driver is poised to also play a major role in the coming years: utility integrated resource planning (IRP). Resource planning has re-emerged in recent years as an important tool for utilities and regulators, particularly in regions where retail competition has failed to take root. In the western United States, the most recent resource plans contemplate a significant amount of renewable energy additions. These planned additions--primarily coming from wind power--are motivated by the improved economics of wind power, a growing acceptance of wind by electric utilities, and an increasing recognition of the inherent risks (e.g., natural gas price risk, environmental compliance risk) in fossil-based generation portfolios. This report examines how twelve western utilities treat renewable energy in their recent resource plans. In aggregate, these utilities supply approximately half of all electricity demand in the western United States. Our purpose is twofold: (1) to highlight the growing importance of utility IRP as a current and future driver of renewable energy, and (2) to identify methodological/modeling issues, and suggest possible improvements to methods used to evaluate renewable energy as a resource option. Here we summarize the key findings of the report, beginning with a discussion of the planned renewable energy additions called for by the twelve utilities, an overview of how these plans incorporated renewables into candidate portfolios, and a review of the specific technology cost and performance assumptions they made, primarily for wind power. We then turn to the utilities' analysis of natural gas price and environmental compliance risks, and examine how the utilities traded off portfolio cost and risk in selecting a preferred portfolio.

Bolinger, Mark; Wiser, Ryan

2005-08-10T23:59:59.000Z

473

ADEQ Nonpoint Source State Management Plan | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights,Information Of TheFixed Logo: ACOREState Management

474

Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control  

Broader source: Energy.gov [DOE]

Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

475

BachelorofManagement InternationalManagement  

E-Print Network [OSTI]

on the official transcript (see Part 11 - Faculty of Management in the 2007/2008 Calendar). Program Planning Guide Management 3050/Political Science 3420 - Human Resource Management Management 3061 - Information Systems Environment Management 3640 - Cross-Cultural Management Practices Management 3660/Geography 3225 - Industrial

Seldin, Jonathan P.

476

PREPARED TESTIMONY OF ROBERT B. WEISENMILLER, PH.D. Qualifying Facilities: Resource Planning and Avoided Costs Methodology ................................ 1  

E-Print Network [OSTI]

Planning and Avoided Costs Methodology ................................ 1 Energy and Capacity Payments............................................................................. 15 Qualifying Facilities: Resource Planning and Avoided Costs Methodology 1. CPUC Order Instituting Testimony on Long Run Avoided Cost Methodology for the California Manufacturers Association, Department

477

Commercial and Industrial Base Intermittent Resource Management Pilot  

E-Print Network [OSTI]

Integration of Renewable Resources: Transmission andhas been the dominant renewable resource in CaliforniasIRR Integration of Renewable Resources MPM-RRD - Market

Kiliccote, Sila

2011-01-01T23:59:59.000Z

478

Commercial and Industrial Base Intermittent Resource Management Pilot  

E-Print Network [OSTI]

has been the dominant renewable resource in CaliforniasIntegration of Renewable Resources: Transmission andIntermittent renewable resources, variable generation,

Kiliccote, Sila

2011-01-01T23:59:59.000Z

479

Managing the Yellowstone River System with Place-based Cultural Data  

E-Print Network [OSTI]

resource management (NRM) and planning (e.g., community-based planning, watershed-based and collaborative management, others). By examining one decentralized riparian management planning effort along the Yellowstone River (Montana), this study finds...

Hall, Damon M.

2011-10-21T23:59:59.000Z

480

94-A13 Native American Initiative Short Course Management Plan  

SciTech Connect (OSTI)

A training program conducted in Bartlesville by BDM-Oklahoma technical staff, which included geologists, geophysicists, exploration and drilling specialists, and environmental policy experts. The proposed training schedule offered four courses per year and included those coursed identified by the tribes in the survey. The training program was outlined for members of Native American Tribes whose lands have oil and gas resources. The proposed program contributed to meeting the goals of the U.S. Department of Energy's (DOE) Domestic Oil and Gas Initiative to help Native American tribes become more self-sufficient in developing and managing their resources through training in cost-effective, improved technologies for hydrocarbon production that will meet environmental regulations. The training program outlined was for adult tribal representatives who are responsible for managing tribal mineral holdings or setting policy, or who work in the oil and gas industry. The course content is in response to a survey that was developed by BDM-Oklahoma and sent in the Spring of 1995 to 26 tribal agencies identified through previous contact with DOE. Tribes were asked to indicate course content needs, levels, preferred time of year, and location. Six tribes responded with specific recommendations and needs. These tribes, were the Creek, Pueblo, Cherokee, St. Regis Mohawk, Northern Arapho, and Ute Mountain Ute.

Carroll, Herbert B.; Johnson, William I.; Kokesh, Judith H.

1999-04-27T23:59:59.000Z

Note: This page contains sample records for the topic "resources management plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

An Economic, Hydrologic, and Environmental Assessment of Water Management Alternative Plans for the South Central Texas Region*1  

E-Print Network [OSTI]

An Economic, Hydrologic, and Environmental Assessment of Water Management Alternative Plans. The economic, hydrologic, and environmental consequences of the "best" choice of regional water management plan, and water management plans. #12;3 An Economic, Hydrologic, and Environmental Assessment of Water Management

McCarl, Bruce A.

482

Sustainable NREL - Site Sustainability Plan FY 2015 (Management Publication)  

SciTech Connect (OSTI)

NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

Not Available

2015-01-01T23:59:59.000Z

483

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect (OSTI)

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

484

Review of Utility Resource Plans in the West: Resource Strategies for a  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReplyofRetiring ProcurementReturnReview of

485

Test Planning and Test Resource Optimization for Droplet-Based Microfluidic Systems*  

E-Print Network [OSTI]

Test Planning and Test Resource Optimization for Droplet-Based Microfluidic Systems* Fei Su, Sule of droplet- based microfluidic systems for safety-critical biomedical applications. In order to ensure reliability, microsystems incorporating microfluidic components must be tested adequately. In this paper, we

Chakrabarty, Krishnendu

486

Make anthem.com your 24/7 resource for health plan information Anthem members  

E-Print Network [OSTI]

health care -- from doctors to dollars You should have the power to select your doctors, find the best prices on what you pay for health care services and choose how you get your health care informationMake anthem.com your 24/7 resource for health plan information Anthem members: Currently registered

487

Administrative & Business Services Strategic Plan for 2015 Evolution of A&BS Strategic Plan  

E-Print Network [OSTI]

: Simplification Goals and Principles Human Resources Initiatives, Policies, and Management Skills Development Analysis of Existing "Administrative Culture" Technology Upgrading Plan and Skills Development DelegationAdministrative & Business Services Strategic Plan for 2015 Evolution of A&BS Strategic Plan

Rose, Michael R.

488

SECTION 2 Table of Contents 2 Province Management Plan and Inventory....................................................2  

E-Print Network [OSTI]

2-1 SECTION 2 ­ Table of Contents 2 Province Management Plan and Inventory. The Oversight Committee for the Intermountain Province (IMP) has decided on a ten-year planning horizon, a provincial approach was taken to subbasin planning. As a result, this section of the document presents

489

Analysis of Landscape Character for Visual Resource Management1  

E-Print Network [OSTI]

in the comprehensive planning process, along with social planning and economic plan- ning. In all three types, Sinatra and Uban 1973). The Land Use Analysis Laboratory is an interdisciplinary research team with active) is a computer program for the static modeling and display of data on spatially-distributed land characteristics

Standiford, Richard B.

490

Virginia Wetlands Report Center for Coastal Resources Management www.ccrm.vims.edu  

E-Print Network [OSTI]

Virginia Wetlands Report Center for Coastal Resources Management www.ccrm.vims.edu Volume 25, Issue: WORKSHOPANNOUNCEMENT Coastal Management Decision Tools Thursday, April 22, 2010 at VIMS See inside for information

491

Savannah River Site Waste Management Program Plan, FY 1993. Revision 1  

SciTech Connect (OSTI)

The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

Not Available

1993-06-01T23:59:59.000Z

492

Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2  

SciTech Connect (OSTI)

The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

Not Available

1993-12-01T23:59:59.000Z

493

Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1  

SciTech Connect (OSTI)

The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

Not Available

1994-09-01T23:59:59.000Z

494

Geothermal Resource Area 6: Lander and Eureka Counties. Area development plan  

SciTech Connect (OSTI)

Geothermal Resource Area 6 includes Lander and Eureka Counties. There are several different geothermal resources ranging in temperature from 70/sup 0/F to in excess of 400/sup 0/F within this two county area. Eleven of these resources are considered major and have been selected for evaluation in this area development plan. The various potential uses of the energy found at each of the 11 resource sites were determined after evaluating the study area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities. These were then compared with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the geothermal sites considered are summarized.

Robinson, S.; Pugsley, M.

1981-01-01T23:59:59.000Z

495

Geothermal resource area 6: Lander and Eureka Counties. Area development plan  

SciTech Connect (OSTI)

Geothermal Resource Area 6 includes Lander and Eureka Counties. There are several different geothermal resources ranging in temperature from 70/sup 0/F to in excess of 400/sup 0/F within this two country area. Eleven of these resources are considered major and have been selected for evaluation in this Area Development Plan. The various potential uses of the energy found at each of the 11 resource sites were determined after evaluating the study area's physical characteristics, land ownership and land use patterns, existing population and projected growth rates, and transportation facilities. These were then compared with the site specific resource characteristics. The uses considered were divided into five main categories: electrical generation, space heating, recreation, industrial process heat, and agriculture. Within two of these categories certain subdivisions were considered separately. The findings about each of the 11 geothermal sites considered are summarized.

Pugsley, M.

1981-01-01T23:59:59.000Z

496

Addressing trend-related changes within cumulative effects studies in water resources planning  

SciTech Connect (OSTI)

Summarized herein are 28 case studies wherein trend-related causative physical, social, or institutional changes were connected to consequential changes in runoff, water quality, and riparian and aquatic ecological features. The reviewed cases were systematically evaluated relative to their identified environmental effects; usage of analytical frameworks, and appropriate models, methods, and technologies; and the attention given to mitigation and/or management of the resultant causative and consequential changes. These changes also represent important considerations in project design and operation, and in cumulative effects studies associated therewith. The cases were grouped into five categories: institutional changes associated with legislation and policies (seven cases); physical changes from land use changes in urbanizing watersheds (eight cases); physical changes from land use changes and development projects in watersheds (four cases); physical, institutional, and social changes from land use and related policy changes in river basins (three cases); and multiple changes within a comprehensive study of land use and policy changes in the Willamette River Basin in Oregon (six cases). A tabulation of 110 models, methods and technologies used in the studies is also presented. General observations from this review were that the features were unique for each case; the consequential changes were logically based on the causative changes; the analytical frameworks provided relevant structures for the studies, and the identified methods and technologies were pertinent for addressing both the causative and consequential changes. One key lesson was that the cases provide useful, real-world illustrations of the importance of addressing trend-related changes in cumulative effects studies within water resources planning. Accordingly, they could be used as an initial tool kit for addressing trend-related changes.

Canter, L.W., E-mail: envimptr@aol.com [University of Oklahoma, Norman, Oklahoma and President, Canter Associates, Inc., Horseshoe Bay, TX (United States); Chawla, M.K. [ERDC-CERL, U.S. Army Corps of Engineers, Champaign, IL (United States)] [ERDC-CERL, U.S. Army Corps of Engineers, Champaign, IL (United States); Swor, C.T. [Canter Associates, Inc., Frankewing, TN (United States)] [Canter Associates, Inc., Frankewing, TN (United States)

2014-01-15T23:59:59.000Z

497

Measuring the Potential to Adopt Self Governance for the Management of a Common Pool Resource  

E-Print Network [OSTI]

Self governance has proved to be a suitable instrument for the management of a common pool resource like fisheries. Under self governance, individuals organize themselves for the use of a resource, to deal with problems derived from the free access...

Colin Castillo, Sergio

2012-02-14T23:59:59.000Z

498

Trading zones : cooperating for water resource and ecosystem management when stakeholders have apparently irreconcilable differences .  

E-Print Network [OSTI]

??Disputes over the management of water resources in the United States often seem irreconcilable because stakeholders' differences in values, beliefs, and identities are so hard (more)

Fuller, Boyd

2006-01-01T23:59:59.000Z

499

History, historical archaeology, and cultural resource management: a case study from Jasper County, South Carolina.  

E-Print Network [OSTI]

??Virgil Noble (1996) has noted a deficiency in historical archaeological research within the sphere of cultural resource management, attributable to inadequacies within regulatory agencies, resulting (more)

Sawyer, Angus Caldwell

2008-01-01T23:59:59.000Z

500

Storm-water management for construction activities. Developing pollution prevention plans and best management practices  

SciTech Connect (OSTI)

The manual provides industrial facilities with comprehensive guidance on the development of storm water pollution prevention plans and identification of appropriate Best Management Practices (BMPs). It provides technical assistance and support to all facilities subject to pollution prevention requirements established under National Pollutant Discharge Elimination System (NPDES) permits for storm water point source discharges. EPA's storm water program significantly expands the scope and application of the existing NPDES permit system for municipal and industrial process wastewater discharges. It emphasizes pollution prevention and reflects a heavy reliance on BMPs to reduce pollutant loadings and improve water quality. The manual provides essential guidance in both of these areas.

Not Available

1992-09-01T23:59:59.000Z