Sample records for reserve petroleum reserves

  1. Strategic Petroleum Reserve

    Broader source: Energy.gov (indexed) [DOE]

    Strategic Petroleum Reserve Emergency Crude Oil Supply Requests Points of Contact Program Office - Washington Jim Gruber (202) 586-1547 James.Gruber@hq.doe.gov Nate Harvey (202)...

  2. Naval petroleum reserves

    SciTech Connect (OSTI)

    Not Available

    1981-01-01T23:59:59.000Z

    A hearing to consider two bills (S. 1744 and H.R. 3023) authorizing appropriations to operate the Naval Petroleum Reserve during fiscal 1982 brought testimony from officials of the Departments of Energy and Defense; from Chevron, USA; and from the Independent Refiners Association. Both bills authorize $228,463,000, of which $2.56 million will be available for the naval oil shale reserves and the remainder for the naval petroleum reserves. Chevron spokesmen noted that 8-11 months were required to reach full production at the Elk Hills site rather than the 60-90 days estimated by DOE, although both Chevron and the Independent Refiners Association of the west coast support the President's decision that it is in the national interest to continue the production of crude from naval petroleum reserves for the next three years.

  3. Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    Not Available

    1991-02-15T23:59:59.000Z

    According to amendments to the Energy Policy and Conservation Act the target size of the Strategic Petroleum Reserve is increased to 1 billion barrels, storage of oil not owned by the Federal Government is authorized, and the Reserve may be drawn down to alleviate an interruption in domestic supply. Congress appropriated $200.6 million for Strategic Petroleum Reserve storage facilities development, operation, and management during FY 1991. During calendar year 1990, 9.8 million barrels of crude oil were acquired for the Strategic Petroleum Reserve. However, this quantity was offset by the sale of 3.9 million barrels during a test sale of the Reserve's oil in the fourth quarter. As of December 31, 1990, the Strategic Petroleum Reserve crude oil inventory was 585.7 million barrels, a net increase of 5.8 million barrels over the 1989 year-end inventory of 579.9 million barrels. The Department has completed all major surface construction at the six SPR facilities, and cavern development is in progress to achieve 750 million barrels of storage by the end of 1991. During 1990, the Department of Energy conducted a test sale of Strategic Petroleum Reserve crude oil (TEST SALE-90) to demonstrate the Reserve's drawdown and distribution capabilities. The test commenced on September 28, 1990, with the issuance of a Notice of Sale. Offers to purchase the oil were received on October 5, 1990 and contracts were awarded to eleven companies for a total of 3.925 million barrels by October 18, 1990. Deliveries of the oil to the purchasers commenced on October 19, 1990, and all deliveries were completed by December 2, 1990. The report gives details on all of these activities. 8 figs., 11 tabs.

  4. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1990-08-15T23:59:59.000Z

    The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on Activities undertaken with respect to the Strategic Petroleum Reserve. This August 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1990, through June 30, 1990. 3 tabs.

  5. Naval Petroleum Reserve No. 1

    SciTech Connect (OSTI)

    Not Available

    1990-01-01T23:59:59.000Z

    For several years, the administration has proposed selling the government's ownership interest in the Naval Petroleum Reserves, arguing that it would help reduce the federal budget deficit. The administration's latest proposal calls for the sale of reserves in fiscal year 1990. DOE estimates that if the reserves are sold in 1990, proceeds would amount to about $3.4 billion. The Naval Petroleum Reserve at Elk Hills, California, is the largest of the reserves. This report has reviewed and analyzed the new reserve data and found that DOE's reserve estimates for Elk Hills are still neither accurate nor up-to-date.

  6. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1992-11-15T23:59:59.000Z

    The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on activities undertaken with respect to the Strategic Petroleum Reserve. Since the Strategic Petroleum Reserve crude oil storage facilities program for the 750 million barrels was completed in 1991, this November 15, 1992, Strategic Petroleum Reserve Quarterly Report focuses on activities related primarily to the status of storage facilities, oil acquisition, budget and costs of the Reserve during the period July 1, 1992, through September 30, 1992.

  7. Strategic petroleum reserve: Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1989-05-15T23:59:59.000Z

    This May 15, 1989, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period January 1, 1989 through March 31, 1989.

  8. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1989-08-15T23:59:59.000Z

    This August 15, 1989, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1989 through June 30, 1989.

  9. Strategic petroleum reserve: Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1988-11-15T23:59:59.000Z

    This November 15, 1988, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period July 1, 1988 through September 30, 1988.

  10. The Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    Not Available

    1991-01-01T23:59:59.000Z

    The Strategic Petroleum Reserve program was set into motion by the 1975 Energy Policy and Conservation Act (EPCA). By 1990, 590 million barrels of oil had been placed in storage. Salt domes along the Gulf Coast offered ideal storage. Both sweet'' and sour'' crude oil have been acquired using various purchase options. Drawdown, sale, and distribution of the oil would proceed according to guidelines set by EPCA in the event of a severe energy supply disruption. (SM)

  11. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1990-05-15T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) was created to reduce the impact of disruptions in petroleum supplies and to carry out obligations of the United States under the Agreement on an International Energy Program. This May 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period January 1, 1990 through March 31, 1990. 3 tabs.

  12. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1991-08-15T23:59:59.000Z

    This August 15, 1991, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period April 1, 1991, through June 30, 1991. The Strategic Petroleum Reserve storage facilities development program is proceeding on schedule. The Reserve's capacity is currently 726 million barrels. A total of 5.5 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending June 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of June 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. The reorganization of the Office of the Strategic Petroleum Reserve became effective June 28, 1991. Under the new organization, the Strategic Petroleum Reserve Project Management Office in Louisiana will report to the Strategic Petroleum Reserve Program Office in Washington rather than the Oak Ridge Field Office in Tennessee. 2 tabs.

  13. Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    Not Available

    1992-02-17T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) facilities development for the authorized 750 million barrel program was completed in 1991. Expansion of the SPR's offsite commercial distribution capacity to 4.3 million barrels per day is in progress. During calendar year 1991, the SPR's crude oil storage capacity increased by 61 million barrels with the completion of caverns at the Big Hill and Bayou Choctaw sites. On January 16, 1991, in conjunction with the beginning of Operation Desert Storm, President Bush ordered a drawdown and distribution of Strategic Petroleum Reserve oil as part of a coordinated contingency plan agreed to by member countries of the International Energy Agency. The Department successfully conducted the drawdown during the period January 17 through March 31 and delivered a total of 17.2 million barrels of crude oil to 13 purchasers. There were no crude oil deliveries to the SPR during the year ending December 31, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of December 31, 1991, the SPR inventory was 568.5 million barrels.

  14. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    NONE

    1995-11-15T23:59:59.000Z

    The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current storage capacity and ullage available; current status of the Strategic Petroleum Reserve storage facilities, major projects and the acquisition of petroleum products; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  15. Strategic petroleum reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1991-05-15T23:59:59.000Z

    This Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period January 1, 1991, through March 31, 1991. A special section is also included discussing the January 1991 drawdown and distribution of crude oil. 8 tabs.

  16. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1992-08-15T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) was created pursuant to the Energy Policy and Conservation Act (EPCA) Public Law 94-163, approved on December 22, 1975, and extended in July 1985, June 1989, March 1990, and September 1990, to reduce the impact of disroptions in petroleum supplies and to carry out obligations of the United States under the Agreement on an International Energy Program. The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on activities undertaken with respect to the Strategic Petroleum Reserve. Since the Strategic Petroleum Reserve crude oil storage facilities program for the 750 minion barrels was completed in 1991, this August 15, 1992, Strategic Petroleum Reserve Quarterly Report focuses on activities related primarily to the storage facilities status, oil acquisition, budget, and cost of the Reserve during the period April 1, 1992, through June 30, 1992.

  17. Strategic petroleum reserve: Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1987-11-15T23:59:59.000Z

    The August 15, 1987, Strategic Petroleum Reserve Quarterly Report describes activities undertaken with respect to the development of the Reserve during the period April 1, 1987 through June 30, 1987. The program background and major activities of this quarter are briefly discussed. Other topics are site development; oil acquisition; information on the budget and cost of the reserve; and other program items. During the second quarter of 1987, Strategic Petroleum Reserve storage capacity reached 570 million barrels. At Bryan Mound, final corrective leaching was completed in Cavern 5 whose conversion from sweet to sour crude oil storage is proceeding on schedule. At West Hackberry, leaching was completed for Cavern 115 and proceeded in the four remaining caverns still under development. At the Bayou Choctaw site, Cavern 17 oil fill was initiated; this 10-million-barrel cavern currently contains over five million barrels of oil. At Big Hill, construction has progressed to the point that attainment of leaching capability by the end of September is on schedule. The total inventory of crude oil stored in the Strategic Petroleum Reserve reached 527,186,515 barrels during the quarter ending June 30, 1987. The average fill rate during the quarter was 79,119 barrels per day, and the weighted average delivered price during this quarter was $19.17 per barrel. Funds available for obligation in fiscal year 1987 include $526 million in the SPR Petroleum Account for the acquisition and transportation of crude oil and $262 million in the Strategic Petroleum Reserve Account for activities associated with storage facilities development and the operation and management of the Strategic Petroleum Reserve. Approximately $23 million of Strategic Petroleum Reserve Account funds will be carried over to reduce new budget authority required for the account in fiscal year 1988.

  18. Strategic petroleum reserve: Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1988-08-15T23:59:59.000Z

    This report describes activities undertaken with respect to the development of the Reserve. The introduction and summary briefly discuss program background and major activities of the quarter. Section II describes site development. Oil acquisition activities are reported in Section III. Information on the budget and cost of the Reserve is contained in Section IV. Strategic Petroleum Reserve storage capacity reached 581.3 million barrels. The total inventory of crude oil stored in the Strategic Petroleum Reserve reached 550, 055,724 barrels. The average fill rate during the quarter was 56,239 barrels per day, and the weighted average delivered price during this quarter was $15.99 per barrel. The average fill rate through the third quarter of fiscal year 1988 was 59,000 barrels per day. Funds available for obligation in fiscal year 1988 include $439 million in the SPR Petroleum Account for the acquisition and transportation of crude oil and $232 million in the Strategic Petroleum Reserve Account for activities associated with storage facilities development and the operation and management of the Strategic Petroleum Reserve.

  19. Strategic petroleum reserve. Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1994-05-15T23:59:59.000Z

    The Strategic Petroleum Reserve serves as one of our most important investments in reducing the Nation`s vulnerability to oil supply disruptions. Its existence provides an effective response mechanism should a disruption occur and a formidable deterrent to the use of oil as a political instrument. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975, (Public Law 94-163) as amended, to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the first quarter of calendar year 1994, including: (1) inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; (2) fill rate for the current quarter and projected fill rate for the next calendar quarter; (3) average price of the petroleum products acquired during the calendar quarter; (4) current and projected storage capacity; (5) analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; (6) funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and (7) major environmental actions completed, in progress, or anticipated.

  20. Strategic petroleum reserve. Quarterly report

    SciTech Connect (OSTI)

    NONE

    1995-08-15T23:59:59.000Z

    The Strategic Petroleum Reserve reduces the Nation`s vulnerability to oil supply disruptions. Its existence provides a formidable deterrent to the use of oil as a political instrument and an effective response mechanism should a disruption occur. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163). Its purposes are to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the United States under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1995, including: inventory of petroleum products stored in the Reserve; current and projected storage capacity, analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  1. Naval Petroleum Reserves | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Naval Petroleum Reserves For much of the 20th century, the Naval Petroleum and Oil Shale Reserves served as a contingency source of fuel for the Nation's military. All that...

  2. Strategic Petroleum Reserve quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-08-15T23:59:59.000Z

    This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  3. Strategic Petroleum Reserve. Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1994-11-15T23:59:59.000Z

    This report summarizes the activities undertaken by the Strategic Petroleum Reserve during the third quarter of calendar year 1994. It addresses issues relative to storage facilities in Texas and Louisiana and include information on fill rate; average price of products purchased; current and projected storage capacity of each facility; analyses of existing or anticipated problems with the acquisition and storage or petroleum products; budgets established for the operation of each facility during the quarter and total; and major environmental actions completed, in progress, or anticipated. The report also briefly discusses two problems which have temporarily reduced the Reserve`s oil inventory for drawdown. These problems are a higher-than-normal gas content and elevated temperatures of crude at other facilities.

  4. Strategic petroleum reserve annual report

    SciTech Connect (OSTI)

    NONE

    1996-02-15T23:59:59.000Z

    Section 165 of the Energy Policy and Conservation Act (Public Law 94- 163), as amended, requires the Secretary of Energy to submit annual reports to the President and the Congress on activities of the Strategic Petroleum Reserve (SPR). This report describes activities for the year ending December 31, 1995.

  5. World petroleum resources and reserves

    SciTech Connect (OSTI)

    Riva, J.P. Jr.

    1983-01-01T23:59:59.000Z

    Up to 1965 the world produced and consumed only 10% of the oil available on this planet; between 1965 and 2040 we will use up 80% of the remaining reserves, leaving only 10% of the resource for the years to follow. Clearly, the epoch of petroleum is a transitory one. Nevertheless, petroleum is at present the most important component of the energy base supporting the industrialized world. This book describes and analyzes the geological basis for the current world petroleum situation. Mr. Riva exaplains the formation and accumulation of conventional and unconventional oil and gas, methods used by geologists in search for petroleum and petroleum-containing basins, and techniques for petroleum production. He then discusses the uneven distribution of the world's oil, focusing on the Arabian-Iranian basin, which contains half of the world's known recoverable reserves, and examines the petroleum prospects in several distinctly different areas of the world. The United States is presented as an example of an area in general decline already exhaustively explored. In contrast, the case study of the Soviet petroleum industry and a geological assessment of Soviet production prospects show a region at the peak of its oil production, with its decline about to begin. He chooses Indonesia as the focus for a typical Southeast Asian petroleum history and develops a profile of Mexico's petroleum situation as an example of an area with increasing production potential. Mr. Riva concludes with an assessment of the prospects for future world petroleum discoveries and a geologically based estimate of the earth's total original stock of recoverable petroleum.

  6. Strategic Petroleum Reserve annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-02-16T23:59:59.000Z

    During 1992 the Department continued planning activities for the expansion of the Strategic Petroleum Reserve to one billion barrels. A draft Environmental Impact Statement for the five candidate sites was completed in October 1992, and a series of public hearings was held during December 1992. Conceptual design engineering activities, life cycle cost estimates and geotechnical studies to support the technical requirements for an Strategic Petroleum Reserve Plan Amendment were essentially completed in December 1992. At the end of 1992, the Strategic Petroleum Reserve crude oil inventory was 574.7 million barrels and an additional 1.7 million barrels was in transit to the Reserve. During 1992 approximately 6.2 million barrels of crude oil were acquired for the Reserve. A Department of Energy Tiger Team Environmental, Safety and Health (ES&H) Assessment was conducted at the Strategic Petroleum Reserve from March 9 through April 10, 1992. In general, the Tiger Team found that Strategic Petroleum Reserve activities do not pose undue environmental, safety or health risks. The Strategic Petroleum Reserve`s Final Corrective Action Plan, prepared in response to the Tiger Team assessment, was submitted for Department approval in December 1992. On November 18, 1992, the Assistant Secretary for Fossil Energy selected DynMcDennott Petroleum Operations Company to provide management and operating services for the Strategic Petroleum Reserve for a period of 5 years commencing April 1, 1993. DynMcDermott will succeed Boeing Petroleum Services, Inc.

  7. Strategic Petroleum Reserve. Quarterly report

    SciTech Connect (OSTI)

    Not Available

    1993-11-15T23:59:59.000Z

    The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. This Quarterly Report highlights activities undertaken during the third quarter of calendar year 1993, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity and plans to accelerate the acquisition or construction of such capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated. Samples of the oil revealed two problems that, although readily correctable, have reduced the availability of some of the oil inventory for drawdown in the near-term. These problems are: (1) a higher-than-normal gas content in some of the crude oil, apparently from years of intrusion of methane form the surrounding salt formation; and (2) elevated temperatures of some of the crude oil, due to geothermal heating, that has increased the vapor pressure of the oil. Investigations are proceeding to determine the extent to which gas intrusion and geothermal heating are impacting the availability of oil for drawdown. Preliminary designs have been developed for systems to mitigate both problems.

  8. DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 January 2, 2009 -...

  9. Naval Petroleum Reserve No. 3 Disposition Decision Analysis and...

    Energy Savers [EERE]

    Naval Petroleum Reserve No. 3 Disposition Decision Analysis and Timeline Naval Petroleum Reserve No. 3 Disposition Decision Analysis and Timeline This Report to Congress provides a...

  10. Strategic Petroleum Reserve: Annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1994-02-16T23:59:59.000Z

    Section 165 of the Energy Policy and Conservation Act (Public Law 94-163), as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities of the Strategic Petroleum Reserve. This report combines the fourth quarter 1993 Quarterly Report with the 1993 Annual Report. Key activities described include appropriations; life extension planning; expansion planning; Strategic Petroleum Reserve oil acquisition; the oil stabilization program; and the refined petroleum product reserve test programs. Sections of this report also describe the program mission; the storage facility development program; environmental compliance; budget and finance; and drawdown and distribution.

  11. Strategic Petroleum Reserve: Annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1988-02-15T23:59:59.000Z

    This report briefly covers the program legislation and the Strategic Petroleum Reserve Plan and its amendments. The current status of the Strategic Petroleum Reserve is outlined in Section II and the appropriations, budget and finances to date are provided in Section III. Section IV addresses organization, management, and contractor support. A discussion of the drawdown system and vulnerability impact are set forth in Section V. The Appendix contains detailed information on the status of each Strategic Petroleum Reserve site and crude oil specificcations. 8 figs., 8 tabs.

  12. EIS-0034: Strategic Petroleum Reserve, Expansion of Reserve, Supplemental

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserve (SPR) developed this SEIS to address the environmental impacts of expanding the SPR to store 1,000 million barrels of oil. The final programmatic EIS (FEA-FES-76-2), addressed the environmental impacts of storing 500 million barrels of oil.

  13. Strategic petroleum reserve crude oil assays

    SciTech Connect (OSTI)

    Not Available

    1991-11-01T23:59:59.000Z

    This booklet provides background information on the purchase of crude oils for the Strategic Petroleum Reserve (SPR), procedures used to assess quality of the stored petroleum, and methods used in generating assays of the various streams which may be sold. Current assays of the eight SPR crude oil streams are included.

  14. Strategic Petroleum Reserve annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1989-02-16T23:59:59.000Z

    Section 165 of the Energy Policy and Conservation Act of 1975, as amended, requires the Secretary of Energy to submit annual and quarterly reports to the President and the Congress on activities to develop the Strategic Petroleum Reserve. Additional prospective information related to the development and fill of the Strategic Petroleum Reserve is required by the Omnibus Budget Reconciliation Act of 1986. This report combines the fourth quarter 1988 Quarterly Report with the 1988 Annual Report. Topics addressed include: storage facilities development; oil acquisition and transportation; budget and finance; drawdown and distribution system and vulnerability impact; other project activities.

  15. Strategic petroleum reserve planning and modeling

    SciTech Connect (OSTI)

    Leiby, P.N.

    1996-06-01T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) is a government-owned stockpile of crude oil intended to serve as a buffer against possible oil market disruptions. The overall purpose of this project is to develop and apply improved models and tools for SPR management. Current project efforts emphasize developing new modeling tools to explicitly and flexibly portray oil market uncertainty and SPR planning risk.

  16. Reserves

    E-Print Network [OSTI]

    Miles, James

    2006-10-05T23:59:59.000Z

    Oct 5, 2006 ... Statutory reserve using methods specified by state insurance .... after the valuation date is discounted with interest to the date of valuation.

  17. Energy policy examined as strategic petroleum reserve is extended

    SciTech Connect (OSTI)

    Yates, M.

    1990-10-11T23:59:59.000Z

    This article reviews the agreement to extent the Strategic Petroleum Reserve (SRV) for 4 more years to 1994, include in the reserve refined products,allows drawdown of reserves without a severe energy supply emergency', allows lease of reserves instead of purchase, allows for testing of drawdown capabilities. Also addressed is the call by political leaders for the development of a national energy policy.

  18. Filling the Strategic Petroleum Reserve | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1999, the Clinton Administration announced a new plan to resume fill of the Strategic Petroleum Reserve with federal royalty oil from production in the Central Gulf of Mexico....

  19. Department of Energy, Office of Naval Petroleum & Oil Shale Reserves

    Broader source: Energy.gov (indexed) [DOE]

    Items that may be marked "disposrtron not Office of Naval Petroleum & Oil Shale Reserves approved" or "withdrawn" In column 10 4 Nameof Personwith whom to confer 5...

  20. Strategic Petroleum Reserve. Annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1992-02-17T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) facilities development for the authorized 750 million barrel program was completed in 1991. Expansion of the SPR`s offsite commercial distribution capacity to 4.3 million barrels per day is in progress. During calendar year 1991, the SPR`s crude oil storage capacity increased by 61 million barrels with the completion of caverns at the Big Hill and Bayou Choctaw sites. On January 16, 1991, in conjunction with the beginning of Operation Desert Storm, President Bush ordered a drawdown and distribution of Strategic Petroleum Reserve oil as part of a coordinated contingency plan agreed to by member countries of the International Energy Agency. The Department successfully conducted the drawdown during the period January 17 through March 31 and delivered a total of 17.2 million barrels of crude oil to 13 purchasers. There were no crude oil deliveries to the SPR during the year ending December 31, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of December 31, 1991, the SPR inventory was 568.5 million barrels.

  1. Annual report of operations. [Naval Petroleum Reserves No. 1, 2, 3; oil shale reserves

    SciTech Connect (OSTI)

    Not Available

    1980-01-01T23:59:59.000Z

    The Naval Petroleum and Oil Shale Reserves during FY 1980 deliver 59,993,213 bbl of crude oil and substantial quantities of natural gas, butane, propane and natural gasoline to the United States market. During September, Naval Petroleum Reserve oil was utilized to resume filling the Strategic Petroleum Reserve. During FY 1980, Naval Petroleum Reserve No. 1, Elk Hills, became the largest producing oil field in California and the second largest producing field in the United States. Production at the end of September was 165,000 bbl/d; production is expected to peak at about 190,000 bbl/d early in calender year 1982. Production from Naval Petroleum Reserves Nos. 2 and 3 in California and Wyoming, contributed 1,101,582 and 1,603,477 bbl of crude oil to the market, respectively. Enhanced oil recovery work has been inititated at Naval Petroleum Reserve no. 3. Total revenues from the Naval Petroleum Reserves during FY 1980 were 1.6 billion. The three Naval Oil Shale Reserves in Colorado and Utah have substantial potential. In addition to containing approximately 2.5 billion bbl recoverable shale oil. They probably contain significant quantities of conventional oil and gas.

  2. Exemplary Hurricane Damage Cleanup Earns Petroleum Reserve Coveted Environmental Award

    Broader source: Energy.gov [DOE]

    An exceptional waste management project at a Texas Strategic Petroleum Reserve site following Hurricane Ike in 2008 has won a DOE Environmental Sustainability (EStar) Award for Waste/Pollution Prevention.

  3. Strategic Petroleum Reserve quarterly report, July 1--September 30, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-11-15T23:59:59.000Z

    The Strategic Petroleum Reserve crude oil storage development program for 750 million barrels was completed this quarter. The final 2.3 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. The Department's competitive Invitation for Bids (IFB) for the sale of the Sulphur Mines facility as an operating petroleum storage site elicited no bids. The IFB was received by 85 firms. Discussions with the General Services Administration (GSA) regarding the transfer of the property to GSA will be initiated in the next quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending September 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of September 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. (VC)

  4. Strategic Petroleum Reserve quarterly report, July 1--September 30, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-11-15T23:59:59.000Z

    The Strategic Petroleum Reserve crude oil storage development program for 750 million barrels was completed this quarter. The final 2.3 million barrels of new gross cavern volume was developed at Big Hill and Bayou Choctaw during the quarter. The Department`s competitive Invitation for Bids (IFB) for the sale of the Sulphur Mines facility as an operating petroleum storage site elicited no bids. The IFB was received by 85 firms. Discussions with the General Services Administration (GSA) regarding the transfer of the property to GSA will be initiated in the next quarter. There were no crude oil deliveries to the Strategic Petroleum Reserve during the calendar quarter ending September 30, 1991. Acquisition of crude oil for the Reserve has been suspended since August 2, 1990, following the invasion of Kuwait by Iraq. As of September 30, 1991, the Strategic Petroleum Reserve inventory was 568.5 million barrels. (VC)

  5. Strategic petroleum reserve: Quarterly report, August 15, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-15T23:59:59.000Z

    The Strategic Petroleum Reserve serves as one of the most important investments in reducing the Nation`s vulnerability to oil supply disruptions. Its existence provides an effective response mechanism should a disruption occur and a formidable deterrent to the use of oil as a political instrument. The Strategic Petroleum Reserve was created pursuant to the Energy Policy and Conservation Act of December 22, 1975 (Public Law 94-163), as amended, to reduce the impact of disruptions in supplies of petroleum products and to carry out obligations of the US under the Agreement on an International Energy Program. Section 165(a) of the Act requires the submission of Annual Reports and Section 165(b)(1) requires the submission of Quarterly Reports. This Quarterly Report highlights activities undertaken during the second quarter of calendar year 1994, including: inventory of petroleum products stored in the Reserve, under contract and in transit at the end of the calendar quarter; fill rate for the current quarter and projected fill rate for the next calendar quarter; average price of the petroleum products acquired during the calendar quarter; current and projected storage capacity; analysis of existing or anticipated problems with the acquisition and storage of petroleum products, and future expansion of storage capacity; funds obligated by the Secretary from the SPR Petroleum Account and the Strategic Petroleum Reserve Account during the prior calendar quarter and in total; and major environmental actions completed, in progress, or anticipated.

  6. Naval Petroleum Reserve No. 1: an assessment of production alternatives

    SciTech Connect (OSTI)

    Not Available

    1984-07-30T23:59:59.000Z

    Under existing legislation, every 3 years the President must decide whether to shut-in or continue production of the Naval Petroleum Reserve No. 1 (NPR-1) oil field at Elk Hills, California. The current authorization for production expires on April 5, 1985. GAO discusses the geologic, budgetary, local economic, and national security implications of three production alternatives for NPR-1: continued production, shut-in, and partial shut in. In addition, GAO discusses the advantages and disadvantages of establishing a Defense Petroleum Reserve, a crude oil reserve for the military, using part of the revenues from continued production at NPR-1 to fund it. During the course of its review, GAO found that production rates at Elk Hills may be too high, causing problems within the reserve that could decrease ultimate recovery of oil by about 139 million barrels. The Department of Energy plans to analyze this situation and, if need be, adjust the rate. 2 figures, 2 tables.

  7. Tiger Team Assessment of the Naval Petroleum Reserves in California

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Naval Petroleum Reserves in California (NPRC) which consists of Naval Petroleum Reserve Number 1 (NPR-1), referred to as the Elk Hills oil field and Naval Petroleum Reserve Number 2 (NPR-2), referred to as the Buena Vista oil field, each located near Bakersfield, California. The Tiger Team Assessment was conducted from November 12 to December 13, 1991, under the auspices of DOE's Office of Special Projects (OSP) under the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES H), and quality assurance (OA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, State of California, and local regulations; applicable DOE Orders; best management practices; and internal NPRC requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of DOE/NPRC, CUSA, and BPOI management of the ES H/QA programs was conducted.

  8. Naval Petroleum Reserves: assessment of alternative operating strategies beyond 1982

    SciTech Connect (OSTI)

    Gsellman, L.R.; Mendis, M.S.; Rosenberg, J.I.

    1981-08-01T23:59:59.000Z

    Legislation authorizing production from two Naval Petroleum Reserves, i.e., NPR-1 (Elk Hills, California) and NPR-3 (Teapot Dome, Wyoming), expires in 1982. This paper presents an assessment of the trade-offs of extending production or returning to a shut-in status. Strategic, economic, and energy factors at the national, regional, and local levels are considered. The results of the study indicate that the only major local impact of shut-in will be on small refineries near NPR-1. At the national level, shut-in increases the size of the national petroleum reserve system. However, economic losses as measured by changes in the present value of real GNP also occur. The estimate of the increase in the size of the national petroleum reserve with shut-in of the NPRs was found to be most sensitive to the assumed length of future import interruptions.

  9. Tiger Team Assessment of the Naval Petroleum Reserves in California

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Naval Petroleum Reserves in California (NPRC) which consists of Naval Petroleum Reserve Number 1 (NPR-1), referred to as the Elk Hills oil field and Naval Petroleum Reserve Number 2 (NPR-2), referred to as the Buena Vista oil field, each located near Bakersfield, California. The Tiger Team Assessment was conducted from November 12 to December 13, 1991, under the auspices of DOE`s Office of Special Projects (OSP) under the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES&H), and quality assurance (OA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, State of California, and local regulations; applicable DOE Orders; best management practices; and internal NPRC requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of DOE/NPRC, CUSA, and BPOI management of the ES&H/QA programs was conducted.

  10. Audit of staffing requirements for the Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    NONE

    1995-03-29T23:59:59.000Z

    The Department of Energy`s (Department) Strategic Petroleum Reserve (Reserve) is responsible for storing large quantities of crude oil, currently about 592 million barrels, to reduce the impact of any future supply disruptions. The Reserve facilities consist of a marine terminal and five underground storage sites located in Louisiana and Texas, and program and administrative offices in New Orleans and Washington, DC. At May 31, 1994, 1,692 Departmental and contractor personnel were employed in the operation, maintenance, and administration of Reserve activities and the Fiscal Year 1994 Congressional Appropriation was about $207 million. The audit was requested by the Deputy Secretary of Energy to assist Departmental management in evaluating the human resources required to meet Reserve program requirements. Specifically, the objective of the audit was to determine whether current staffing levels for the Reserve were necessary to effectively and efficiently accomplish current and future anticipated mission requirements. The Secretary`s goal of having the Department and its contractors embrace the best management practices in other Government agencies and industry to improve processes and eliminate waste has not been fully realized by Reserve management. We identified industry performance levels and staffing practices that, if achieved by the Reserve, could enable the Reserve to eliminate approximately 329 positions in eight functional areas with potential annual savings of about $16 million. Our analysis indicated that additional staffing reductions are possible over the long term through further application of industry practices and decreases in the number of managers. However, such staffing reductions will require further analysis by management to determine the specific number of staffing reductions that are attainable. The actual staffing reductions realized by the Reserve will be heavily influenced by several factors.

  11. Strategic Petroleum Reserve annual report for calendar year 1998

    SciTech Connect (OSTI)

    NONE

    1998-12-31T23:59:59.000Z

    The Strategic Petroleum Reserve was established in 1975 as an emergency response to the 1973 Arab oil embargo. It is authorized by the Energy Policy and Conservation Act (EPCA), and by the comprehensive energy plans of all Administrations since 1975, in recognition of the long-term dependence of the US on imported crude oil and petroleum products. Section 165 of EPCA requires the Secretary of Energy to submit an Annual Report to the President and the Congress. On May 13, 1998, the Department published a Statement of Administration Policy which reaffirmed its commitment to maintain a Government-owned and controlled, centrally located Strategic Petroleum Reserve of crude oil. The Reserve is to be used solely for responding to the types of severe oil supply interruptions presently contemplated in EPCA. Over the past twenty years, the Reserve has grown as large as 592 million barrels--a peak reached in 1994. From 1994 to 1996, nearly 28 million barrels were sold to raise revenues for the U S Treasury. As of December 31, 1998, the crude oil inventory was 561,108,127 barrels which equated to 60 days of net oil imports during 1998. The US now relies on a combination of both the Reserve and private stocks to meet its oil storage obligations to the International Energy Agency.

  12. Logistics of the US Strategic Petroleum Reserve in the world petroleum market: 1990-2000

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    The report discusses whether the Strategic Petroleum Reserve will be sufficient to deal with potential supply disruptions during the 1990s. The study concerns itself with the topics deemed of most importance for critical policy decisions with respect to the logistics of the reserve.

  13. Strategic Petroleum Reserve | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary900Steep SlopeStochastic WeeklyStoresStrategicReserve

  14. Strategic Petroleum Reserve quarterly report, (January 1, 1992--March 31, 1992)

    SciTech Connect (OSTI)

    Not Available

    1992-05-15T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) was created pursuant to the Energy Policy and Conservation Act (Public Law 94-163), approved on December 22, 1975, and extended in July 1985, June 1989, March 1990, and September 1990, to reduce the impact of disruptions in petroleum supplies and to carry out obligations of the United States under the Agreement on an International Energy Program. The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on activities undertaken with respect to the Strategic Petroleum Reserve. Since the Strategic Petroleum Reserve crude oil storage program for the 750 million barrels was completed in 1991, this May 15, 1992, Strategic Petroleum Reserve Quarterly Report focuses on activities related primarily to the storage facilities status, oil acquisition, budget, and cost of the Reserve during the period January 1, 1992, through March 31, 1992. On February 24, 1992, Secretary James D. Watkins announced that he had directed the Department to reenter the international spot market to resume fill of the Strategic Petroleum Reserve. Oil purchases for the Strategic Petroleum Reserve were suspended on August 2, 1990, when Iraq's invasion of Kuwait raised concerns about the stability of world petroleum supplies. On March 17, 1992, a solicitation for offers to deliver crude oil to the Reserve was issued by the Defense Fuel Supply Center, the Department's crude oil purchasing agent for the Strategic Petroleum Reserve.

  15. Strategic Petroleum Reserve quarterly report, (July 1, 1990--September 30, 1990)

    SciTech Connect (OSTI)

    Not Available

    1990-11-15T23:59:59.000Z

    This November 15, 1990, Strategic Petroleum Reserve Quarterly Report describes activities related to the site development, oil acquisition, budget and cost of the Reserve during the period July 1, 1990, through September 30, 1990. 4 tabs.

  16. EIS-0075: Strategic Petroleum Reserve, New Orleans, Louisiana (September 2009)

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserve (SPR) Office developed this EIS to assess the environmental impacts of expanding the existing SPR storage capacity from 538 million to 750 million barrels of storage and increasing the drawdown capability from 3.5 million to 4.5 million barrels per day. This EIS incorperates two previously issued EISs: DOE/EIS-0021, Seaway Group of Salt Domes, and DOE/EIS-0029, Texoma Group of Salt Domes.

  17. Analysis of Strategic Petroleum Reserve bubble point pressure data

    SciTech Connect (OSTI)

    Lott, S.E.

    1996-05-01T23:59:59.000Z

    Mathematical models are presented to predict the bubble pressure for 481 cavern oil samples withdrawn from the Bryan Mound, West Hackberry, Big Hill, and Bayou Choctaw Strategic Petroleum Reserve sites. The predicted bubble point pressure is compared to experimentally measured bubble point pressure to resolve potential sources of error introduced to the experimental analysis. In order to gain a higher level of confidence in the measurement of the bubble point pressure, a stochastic analysis of the data is recommended in the future.

  18. Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1996-12-31T23:59:59.000Z

    During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

  19. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31T23:59:59.000Z

    During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

  20. Naval Petroleum Reserve No. 1 (Elk Hills): Supplemental environmental impact statement. Record of decision

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    Pursuant to the Council on Environmental Quality regulations, which implement the procedural provisions of the National Environmental Policy Act, and the US Department of Energy National Environmental Policy Act regulations, the Department of Energy, Office of Fossil Energy, is issuing a Record of Decision on the continued operation of Naval Petroleum Reserve No. 1, Kern County, California. The Department of Energy has decided to continue current operations at Naval Petroleum Reserve No. 1 and implement additional well drilling, facility development projects and other activities necessary for continued production of Naval Petroleum Reserve No. 1 in accordance with the requirements of the Naval Petroleum Reserves Production Act of 1976. The final Supplemental Environmental Impact Statement, entitled ``Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California (DOE/SEIS-0158),`` was released on September 3, 1993.

  1. EIS-0165: Strategic Petroleum Reserve Alabama, Louisiana, Mississippi, and Texas

    Broader source: Energy.gov [DOE]

    This EIS assesses the impacts of construction and operation for the range of alternatives being considered and focuses on oil and brine spill risk and impacts of brine disposal. The proposed action entails the development of a plan for 250 million barrels of new crude oil storage capacity in two Gulf Coast salt domes to expand the Strategic. Petroleum Reserve pursuant to Congressional directive (PL I 01-383 and PL 101-512). Storage capacity would he developed by solution-mining the salt which would require about two billion barrels of surface water and would generate about two billion barrels of salt brine.

  2. Optimal Strategic Petroleum Reserve Policies: A Steady State Analysis Author(s): Shmuel S. Oren and Shao Hong Wan

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Optimal Strategic Petroleum Reserve Policies: A Steady State Analysis Author(s): Shmuel S. Oren.S.A. OPTIMAL STRATEGIC PETROLEUM RESERVE POLICIES: A STEADY STATE ANALYSIS* SHMUEL S. OREN AND SHAO HONG WAN Petroleum Reserve (SPR) under a variety of supply and demand conditions. The optimal policy variables

  3. Allowable pillar to diameter ratio for strategic petroleum reserve caverns.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Park, Byoung Yoon

    2011-05-01T23:59:59.000Z

    This report compiles 3-D finite element analyses performed to evaluate the stability of Strategic Petroleum Reserve (SPR) caverns over multiple leach cycles. When oil is withdrawn from a cavern in salt using freshwater, the cavern enlarges. As a result, the pillar separating caverns in the SPR fields is reduced over time due to usage of the reserve. The enlarged cavern diameters and smaller pillars reduce underground stability. Advances in geomechanics modeling enable the allowable pillar to diameter ratio (P/D) to be defined. Prior to such modeling capabilities, the allowable P/D was established as 1.78 based on some very limited experience in other cavern fields. While appropriate for 1980, the ratio conservatively limits the allowable number of oil drawdowns and hence limits the overall utility and life of the SPR cavern field. Analyses from all four cavern fields are evaluated along with operating experience gained over the past 30 years to define a new P/D for the reserve. A new ratio of 1.0 is recommended. This ratio is applicable only to existing SPR caverns.

  4. Strategic Petroleum Reserve quarterly report, [January 1, 1992--March 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-05-15T23:59:59.000Z

    The Strategic Petroleum Reserve (SPR) was created pursuant to the Energy Policy and Conservation Act (Public Law 94-163), approved on December 22, 1975, and extended in July 1985, June 1989, March 1990, and September 1990, to reduce the impact of disruptions in petroleum supplies and to carry out obligations of the United States under the Agreement on an International Energy Program. The Strategic Petroleum Reserve Quarterly Report is submitted in accordance with section 165(b) of the Energy Policy and Conservation Act, as amended, which requires that the Secretary of Energy submit quarterly reports to Congress on activities undertaken with respect to the Strategic Petroleum Reserve. Since the Strategic Petroleum Reserve crude oil storage program for the 750 million barrels was completed in 1991, this May 15, 1992, Strategic Petroleum Reserve Quarterly Report focuses on activities related primarily to the storage facilities status, oil acquisition, budget, and cost of the Reserve during the period January 1, 1992, through March 31, 1992. On February 24, 1992, Secretary James D. Watkins announced that he had directed the Department to reenter the international spot market to resume fill of the Strategic Petroleum Reserve. Oil purchases for the Strategic Petroleum Reserve were suspended on August 2, 1990, when Iraq`s invasion of Kuwait raised concerns about the stability of world petroleum supplies. On March 17, 1992, a solicitation for offers to deliver crude oil to the Reserve was issued by the Defense Fuel Supply Center, the Department`s crude oil purchasing agent for the Strategic Petroleum Reserve.

  5. Habitat restoration on naval petroleum reserves in Kern County, California

    SciTech Connect (OSTI)

    Anderson, D.C. [EG& G Energy Measurements, Inc., Tupman, CA (United States)

    1990-12-31T23:59:59.000Z

    One of several task performed under contract to the Department of Energy (DOE) by EG & G Energy Measurements as part of the endangered species program is the restoration of abandoned well pads, roads, pipelines and soil borrow sites resulting from oil and gas production activities on Naval Petroleum Reserves in California (NPRC). Naval Petroleum Reserves in California is located in the Elk Hills approximately 30 miles southwest of Bakersfield in the rain shadow of the coastal range. Annual precipitation is approximately five inches. Reclamation of disturbed habitat on NPRC began with research plots and test trials in the early 1980s. Full scale reclamation began in 1985 and has continued through the 1989 planting season. Almost 700 acres have been revegetated, which represents over 1,200 sites distributed over the 47,250 acres of NPRC and averaging less than .75 acre in size. Monitoring of the sites began in 1987 to establish reclamation success and evaluate reclamation techniques. Reclamation objectives include the improvement of wildlife habitat for four endangered species living on NPRC, and the protection of the soils from wind and water erosion on the disturbed sites.

  6. 1989 Annual environmental report for the Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    Not Available

    1990-06-01T23:59:59.000Z

    This report, provided annually, summarizes monitoring data collected to assess Strategic Petroleum Reserve (SPR) impacts on the environment. The report serves as a management tool for mitigating such impacts, thus serving the public interest by ensuring environmentally sound operation of the Strategic Petroleum Reserve (SPR). Included is a description of each site's environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1989. The active permits and the results of the environmental monitoring program (i.e., air, surface water, groundwater, and waste discharges) are discussed by site. The quality assurance program is presented which includes results from laboratory and field audits and studies performed internally and by regulatory agencies. In general, no significant adverse environmental impact resulted from SPR activities during 1989, except for a brine release from a pipeline perforation south of the Bryan Mound site adversely affecting a small area of marsh vegetation which is recovering at this time. 22 refs., 15 figs., 17 tabs.

  7. Naval petroleum reserves: Sales procedures and prices received for Elk Hills oil

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    The Congress expressed concern about the Department of Energy's actions in selling oil from the Elk Hills Naval Petroleum Reserve at what appeared to be unreasonably low prices. DOE officials believe that Naval Petroleum Reserve oil has been and is currently being produced at the appropriate rate and that no recoverable oil has been lost. This fact sheet provides information on the basis for the procedures followed by DOE in selling Naval Petroleum Reserve oil and sales data for the period extending from October 1985 through April 1986.

  8. EA-1236: Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, WY

    Broader source: Energy.gov [DOE]

    Final Sitewide Environmental Assessment (EA) This Sitewide EA evaluates activities that DOE would conduct in anticipation of possible transfer of Naval Petroleum Reserve No. 3 (NPR-3) out of Federal operation.

  9. EIS-0010: Strategic Petroleum Reserves, Sulphur Mines Salt Dome, Calcasieu Parish, Louisiana

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserves prepared this EIS to assess the environmental impacts of the proposed storage of 24 million barrels of crude oil at the Sulphur Mines salt dome located in Calcasieu Parish, Louisiana, including construction and operation impacts.

  10. EIS-0158: Sale of the Naval Petroleum Reserve No. 1 at Elk Hills, California (1997)

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to assess the potential environmental impacts of the continued operation of the Naval Petroleum Reserve No. 1 at the Maximum Efficient Rate authorized by Public Law 94-258.

  11. EIS-0385: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi

    Broader source: Energy.gov [DOE]

    DOE announced the cancellation of a supplemental environmental impact statement for certain facilities associated with the 2007 selection of Richton, Mississippi, as the location of a new storage site for expanding the Strategic Petroleum Reserve.

  12. US Department of Energy Naval petroleum reserve number 1. Financial statement audit

    SciTech Connect (OSTI)

    NONE

    1997-03-01T23:59:59.000Z

    The Naval Petroleum and Oil Shale Reserves (NPOSR) produces crude oil and associated hydrocarbons from the Naval Petroleum Reserves (NPR) numbered 1, 2, and 3, and the Naval Oil Shale Reserves numbered 1, 2, and 3 in a manner to achieve the greatest value and benefits to the United States taxpayer. NPOSR was established by a series of Executive Orders in the early 1900s as a future source of liquid fuels for the military. NPOSR remained largely inactive until Congress, responding to the Arab oil embargo of 1973-74, passed the Naval Petroleum Reserves Production Act of 1976. The law authorized production for six years. Thereafter, NPOSR production could be reauthorized by the President in three-year increments. Since enactment of the law, every President has determined that continuing NPOSR production is in the nation`s best interest. NPOSR currently is authorized to continue production through April 5, 2000.

  13. Horizontal wells improve recovery at the Elk Hills Petroleum Reserve

    SciTech Connect (OSTI)

    Rintoul, B.

    1995-11-01T23:59:59.000Z

    In 1988 the US Department of Energy and Bechtel implemented a program to slow production declines in the Elk Hills 26R pool sand of the Naval Petroleum Reserve No. 1. It was also hoped horizontal wells would increase the production rate, decrease gas production and extend economic life of the reservoir. The Stevens sand pool targeted for the project is a high-quality, sand-rich turbidite channel system encapsulated within Miocene Monterey siliceous shales, mudstones and associated sediments. The pool is about 3-miles long by 3/4-mile wide. The paper describes the specifications and drilling of the first four out of the 14 horizontal wells drilled at this facility. Horizontal drilling technology has completely altered the future of the 26R pool. In 1980 estimated ultimate recovery (EUR) from the sand was 211 million bbl. With the latest horizontal well drilling campaign, the pool is expected to pass that estimate in 1997 when oil production is forecasted to be at least 13,000 b/d. EUR form the 26R sand now is more than 250 million bbl, and even that estimate is being revised upward.

  14. Strategic Petroleum Reserve site environmental report for calendar year 1997

    SciTech Connect (OSTI)

    NONE

    1998-11-01T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts for the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a describe of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1997. Two of these highlights include decommissioning of the Weeks Island site, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 12.6 million m{sup 3} (79.3 million barrels) of crude oil inventory at the Big Hill and Bryan Mound facilities.

  15. Three dimensional simulation for Big Hill Strategic Petroleum Reserve (SPR).

    SciTech Connect (OSTI)

    Ehgartner, Brian L. (Sandia National Laboratories, Albuquerque, NM); Park, Byoung Yoon; Sobolik, Steven Ronald (Sandia National Laboratories, Albuquerque, NM); Lee, Moo Yul (Sandia National Laboratories, Albuquerque, NM)

    2005-07-01T23:59:59.000Z

    3-D finite element analyses were performed to evaluate the structural integrity of caverns located at the Strategic Petroleum Reserve's Big Hill site. State-of-art analyses simulated the current site configuration and considered additional caverns. The addition of 5 caverns to account for a full site and a full dome containing 31 caverns were modeled. Operations including both normal and cavern workover pressures and cavern enlargement due to leaching were modeled to account for as many as 5 future oil drawdowns. Under the modeled conditions, caverns were placed very close to the edge of the salt dome. The web of salt separating the caverns and the web of salt between the caverns and edge of the salt dome were reduced due to leaching. The impacts on cavern stability, underground creep closure, surface subsidence and infrastructure, and well integrity were quantified. The analyses included recently derived damage criterion obtained from testing of Big Hill salt cores. The results show that from a structural view point, many additional caverns can be safely added to Big Hill.

  16. Analysis of cavern shapes for the strategic petroleum reserve.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Sobolik, Steven Ronald

    2006-07-01T23:59:59.000Z

    This report presents computational analyses to determine the structural integrity of different salt cavern shapes. Three characteristic shapes for increasing cavern volumes are evaluated and compared to the baseline shape of a cylindrical cavern. Caverns with enlarged tops, bottoms, and mid-sections are modeled. The results address pillar to diameter ratios of some existing caverns in the system and will represent the final shape of other caverns if they are repeatedly drawn down. This deliverable is performed in support of the U.S. Strategic Petroleum Reserve. Several three-dimensional models using a close-packed arrangement of 19 caverns have been built and analyzed using a simplified symmetry involving a 30-degree wedge portion of the model. This approach has been used previously for West Hackberry (Ehgartner and Sobolik, 2002) and Big Hill (Park et al., 2005) analyses. A stratigraphy based on the Big Hill site has been incorporated into the model. The caverns are modeled without wells and casing to simplify the calculations. These calculations have been made using the power law creep model. The four cavern shapes were evaluated at several different cavern radii against four design factors. These factors included the dilatant damage safety factor in salt, the cavern volume closure, axial well strain in the caprock, and surface subsidence. The relative performance of each of the cavern shapes varies for the different design factors, although it is apparent that the enlarged bottom design provides the worst overall performance. The results of the calculations are put in the context of the history of cavern analyses assuming cylindrical caverns, and how these results affect previous understanding of cavern behavior in a salt dome.

  17. Strategic Petroleum Reserve Site Environmental Report for calendar year 1994

    SciTech Connect (OSTI)

    NONE

    1995-05-31T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. The SER, provided annually in accordance with Department of Energy DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the Strategic Petroleum Reserve (SPR) impacts the environment. This report (SER) provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1994. Two of these highlights include decommissioning of the Weeks Island facility (disposition of 73 million barrels of crude oil inventory) as well as the degasification of up to 144 million barrels of crude oil inventory at the Bayou Choctaw, Big Hill, Bryan Mound, and West Hackberry facilities. The decision to decommission the Weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Degasifying the crude oil is required to reduce potentially harmful emissions that would occur during oil movements. With regard to still another major environmental action, 43 of the original 84 environmental findings from the 1992 DOE Tiger Team Assessment were closed by the end of 1994. Spills to the environment, another major topic, indicates a positive trend. Total volume of oil spilled in 1994 was only 39 barrels, down from 232 barrels in 1993, and the total volume of brine spilled was only 90 barrels, down from 370 barrels in 1993. The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to nine in 1994.

  18. Strategic petroleum reserve site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    NONE

    1996-05-31T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Included in this report is a description of each site`s environment, an overview of the Strategic Petroleum Reserve (SPR) environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1995. Two of these highlights include decommissioning of 3 the weeks Island facility, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 4.5 million m{sup 3} (30 million barrels) of crude oil inventory at the Bryan Mound and West Hackberry facilities. The decision to decommission the weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Transfer of Weeks Island oil began in November, 1995 with 2.0 million m{sup 3} (12.5 million barrels) transferred by December 31, 1995. Degasifying the crude oil is a major pollution prevention initiative because it will reduce potentially harmful emissions that would occur during oil movements by three or more orders of magnitude. Spills to the environment, another major topic, indicates a positive trend. There were only two reportable oil and three reportable brine spills during 1995, down from a total of 10 reportable spills in 1994. Total volume of oil spilled in 1995 was 56.3 m{sup 3} (354 barrels), and the total volume of brine spilled was 131.1 m{sup 3} (825 barrels). The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to five in 1995. All of the spills were reported to appropriate agencies and immediately cleaned up, with no long term impacts observed.

  19. Strategic petroleum reserve caverns casing damage update 1997

    SciTech Connect (OSTI)

    Munson, D.E.; Molecke, M.A.; Neal, J.T. [and others

    1998-01-01T23:59:59.000Z

    Hanging casing strings are used for oil and brine transfer in the domal salt storage caverns of the Strategic Petroleum Reserve (SPR). Damage to these casings is of concern because hanging string replacement is costly and because of implications on cavern stability. Although the causes of casing damage are not always well defined, many events leading to damage are assumed to be the result of salt falls impacting the hanging strings. However, in some cases, operational aspects may be suspected. The history of damage to hanging strings is updated in this study to include the most recent events. Potential general domal and local operational and material factors that could influence the tendency for caverns to have salt falls are examined in detail. As a result of this examination, general factors, such as salt dome anomalies and crude type, and most of the operational factors, such as geometry, location and depressurizations, are not believed to be primary causes of casing damage. Further analysis is presented of the accumulation of insolubles during cavern solutioning and accumulation of salt fall material on the cavern floor. Inaccuracies in sump geometry probably make relative cavern insolubles contents uncertain. However, determination of the salt fall accumulations, which are more accurate, suggest that the caverns with the largest salt fall accumulations show the greatest number of hanging string events. There is good correlation between the accumulation rate and the number of events when the event numbers are corrected to an equivalent number for a single hanging string in a quiescent, operating cavern. The principal factor that determines the propensity for a cavern to exhibit this behavior is thought to be the effect of impurity content on the fracture behavior of salt.

  20. Quantifying VOC emissions for the strategic petroleum reserve.

    SciTech Connect (OSTI)

    Knowlton, Robert G.; Lord, David L.

    2013-06-01T23:59:59.000Z

    A very important aspect of the Department of Energy's (DOE's) Strategic Petroleum Reserve (SPR) program is regulatory compliance. One of the regulatory compliance issues deals with limiting the amount of volatile organic compounds (VOCs) that are emitted into the atmosphere from brine wastes when they are discharged to brine holding ponds. The US Environmental Protection Agency (USEPA) has set limits on the amount of VOCs that can be discharged to the atmosphere. Several attempts have been made to quantify the VOC emissions associated with the brine ponds going back to the late 1970's. There are potential issues associated with each of these quantification efforts. Two efforts were made to quantify VOC emissions by analyzing VOC content of brine samples obtained from wells. Efforts to measure air concentrations were mentioned in historical reports but no data have been located to confirm these assertions. A modeling effort was also performed to quantify the VOC emissions. More recently in 2011- 2013, additional brine sampling has been performed to update the VOC emissions estimate. An analysis of the statistical confidence in these results is presented here. Arguably, there are uncertainties associated with each of these efforts. The analysis herein indicates that the upper confidence limit in VOC emissions based on recent brine sampling is very close to the 0.42 ton/MMB limit used historically on the project. Refining this estimate would require considerable investment in additional sampling, analysis, and monitoring. An analysis of the VOC emissions at each site suggests that additional discharges could be made and stay within current regulatory limits.

  1. Mitigation action plan sale of Naval Petroleum Reserve No. 1 (Elk Hills) Kern County, California

    SciTech Connect (OSTI)

    NONE

    1998-01-01T23:59:59.000Z

    Naval Petroleum Reserve No. 1 (NPR-1, also called {open_quotes}Elk Hills{close_quotes}), a Federally-owned oil and gas production field in Kern County, California, was created by an Executive Order issued by President Taft on September 2, 1912. He signed another Executive Order on December 13, 1912, to establish Naval Petroleum Reserve No. 2 (NPR-2), located immediately south of NPR-1 and containing portions of the town of Taft, California. NPR-1 was not developed until the 1973-74 oil embargo demonstrated the nation`s vulnerability to oil supply interruptions. Following the embargo, Congress passed the Naval Petroleum Reserves Production Act of 1976 which directed that the reserve be explored and developed to its fall economic potential at the {open_quotes}maximum efficient rate{close_quotes} (MER) of production. Since Elk Hills began full production in 1976, it has functioned as a commercial operation, with total revenues to the Federal government through FY 1996 of $16.4 billion, compared to total exploration, development and production costs of $3.1 billion. In February 1996, Title 34 of the National Defense Authorization Act for Fiscal Year 1996 (P.L. 104-106), referred to as the Elk Hills Sales Statute, directed the Secretary of Energy to sell NPR-1 by February 10, 1998.The Secretary was also directed to study options for enhancing the value of the other Naval Petroleum and Oil Shale Reserve properties such as NPR-2, located adjacent to NPR-1 in Kern County- Naval Petroleum Reserve No. 3 (NPR-3) located in Natrona County, Wyoming; Naval Oil Shale Reserves No. 1 and No. 3 (NOSR-1 and NOSR-3) located in Garfield County, Colorado; and Naval Oil Shale Reserve No. 2 (NOSR-2) located in Uintah and Carbon Counties, Utah. The purpose of these actions was to remove the Federal government from the inherently non-Federal function of operating commercial oil fields while making sure that the public would obtain the maximum value from the reserves.

  2. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31T23:59:59.000Z

    During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program`s oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994.

  3. Report to the Congress on alternative methods for the Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    Not Available

    1990-02-01T23:59:59.000Z

    The purpose of this study is to fulfill the requirements of Public Law No. 101-46, approved June 30, 1989. The study describes and evaluates alternative methods for financing the future expansion of the Strategic petroleum Reserve (SPR), both to the current target level of 750 million barrels and to potential future levels of up to one billion barrels.

  4. EIS-0001: Strategic Petroleum Reserve, Bryan Mound Salt Dome, Brazoria County, Texas

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserve prepared this SEIS to address the environmental impacts of construction and operation of two types of brine disposal systems and a new water supply system. This EIS supplements FES 76/77-6, Bryan Mound Storage Site.

  5. A critical review of methods used in the estimation of natural gas reserves: Natural gas reserves in the state of Texas. Some educational prerequisites in the field of petroleum economics and evaluation.

    E-Print Network [OSTI]

    Crichton, John Alston

    1953-01-01T23:59:59.000Z

    A CRITICAL REVIEW OF METHODS USED IN THE ESTIMATION OF NATURAL GAS RESERVES NATURAL GAS RESERVES IN THE SI'AT. S OF TEXAS SOME EDUCATIONAL PREREQUISITES IN THE FIELD OF PETROLEUM ECONOMICS AND EVAI UATION Sy John Alston Crichton... ENGINEERING TABLE of CONTENTS ~Pa e A CRITICAL REVIEW OF METHODS USED IN THE ESTIMATION OF NATURAL GAS RESERVES Abstract Introdu=tion History of the Estimation of Gas Reserves Present Methods of Estimating Gas Reserves Meth& ds of Estimating Non...

  6. Tiger Team Assessment of the Navel Petroleum and Oil Shale Reserves Colorado, Utah, and Wyoming

    SciTech Connect (OSTI)

    Not Available

    1992-07-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Naval Petroleum Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW). NPOSR-CUW consists of Naval Petroleum Reserve Number 3 located near Casper, Wyoming; Naval Oil Shale Reserve Number I and Naval Oil Shale Reserve Number 3 located near Rifle, Colorado; and Naval Oil Shale Reserve Number 2 located near Vernal, Utah, which was not examined as part of this assessment. The assessment was comprehensive, encompassing environment, safety, and health (ES H) and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal NPOSR-CUW requirements was assessed. The NPOSR-CUW Tiger Team Assessment is part of a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and contractor ES H management programs, response actions to address the identified problem areas, and DOE-wide ES H compliance trends and root causes.

  7. Technical Safety Appraisal of the Naval Petroleum Reserve No. 1, Elk Hills, California

    SciTech Connect (OSTI)

    Not Available

    1990-02-01T23:59:59.000Z

    This report presents the results of a focused Technical Safety Appraisal (TSA) of the Naval Petroleum Reserve No. 1 (NPR-1), Elk Hills, California, conducted during November 27 through December 8, 1989. The Department of Energy (DOE) program organization responsible for NPR-1 is the Assistant Secretary for Fossil Energy (FE); the responsible Field Office is the Naval Petroleum Reserves California (NPRC) Office. This appraisal is an application of the program that was initiated in 1985 to strengthen the DOE Environment, Safety and Health Program. The appraisal was conducted by the staff of the DOE Assistant Secretary for Environment, Safety and Health (EH), Office of Safety Appraisals, with support from experts in specific appraisal areas, including a number from the petroleum industry, and a liaison representative from FE. The Senior EH Manager for the appraisal was Mr. Robert Barber, Acting Director, Office of Compliance Programs; the Team Leader was Dr. Owen Thompson, Office of Safety Appraisals.

  8. U.S. strategic petroleum reserve Big Hill 114 leak analysis 2012.

    SciTech Connect (OSTI)

    Lord, David L.; Roberts, Barry L.; Lord, Anna C. Snider; Sobolik, Steven Ronald; Park, Byoung Yoon; Rudeen, David Keith [GRAM, Inc., Albuquerque, NM

    2013-06-01T23:59:59.000Z

    This report addresses recent well integrity issues related to cavern 114 at the Big Hill Strategic Petroleum Reserve site. DM Petroleum Operations, M&O contractor for the U.S. Strategic Petroleum Reserve, recognized an apparent leak in Big Hill cavern well 114A in late summer, 2012, and provided written notice to the State of Texas as required by law. DM has since isolated the leak in well A with a temporary plug, and is planning on remediating both 114 A- and B-wells with liners. In this report Sandia provides an analysis of the apparent leak that includes: (i) estimated leak volume, (ii) recommendation for operating pressure to maintain in the cavern between temporary and permanent fixes for the well integrity issues, and (iii) identification of other caverns or wells at Big Hill that should be monitored closely in light of the sequence of failures there in the last several years.

  9. EIS-0029: Strategic Petroleum Reserve, Texoma Group Salt Domes, Cameron and Calcasieu Parishes, Louisiana and Jefferson County, TX

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserves developed this EIS to analyze the environmental impacts which could occur during site preparation and operation of oil storage facilities at each of four proposed candidate sites in the Texoma Group of salt domes.

  10. Report to the Congress on alternative financing methods for the Strategic Petroleum Reserve

    SciTech Connect (OSTI)

    Not Available

    1990-02-01T23:59:59.000Z

    Under current practice, the Federal Government owns the Strategic Petroleum Reserve (SPR) crude oil and the storage facilities. The funds to acquire and maintain the reserve generally have been derived from normal Federal budget resources; $20 billion in appropriated funds have thus far been made available. During 1989, in Public Law No. 101-46, the Congress extended the EPCA authorities until April 1, 1990 and required the Department of Energy (DOE) to conduct a study of alternative ways of financing the reserve, with a final report on the study to be submitted by February 1, 1990. The Administration decided to undertake the study of alternative SPR financing methods in conjunction with a parallel study of SPR size, through an Interagency Steering group, chaired by the DOE Deputy Under Secretary. Day-to-day responsibility for the study was assigned to an Interagency Working Group comprised of representatives of interested Federal agencies. Study activities are described. 4 tabs.

  11. Investigation on the continued production of the Naval Petroleum Reserves beyond April 5, 1991

    SciTech Connect (OSTI)

    Not Available

    1990-09-01T23:59:59.000Z

    The authority to produce the Naval Petroleum Reserves (NPRs) is due to expire in April 1991, unless extended by Presidential finding. As provided in the Naval Petroleum Reserves Production act of 1976 (Public Law 94-258), the President may continue production of the NPRs for a period of up to three years following the submission to Congress, at least 180 days prior to the expiration of the current production period, of a report that determines that continued production of the NPRs is necessary and a finding by the President that continued production is in the national interest. This report assesses the need to continue production of the NPRs, including analyzing the benefits and costs of extending production or returning to the shut-in status that existed prior to 1976. This continued production study considers strategic, economic, and energy issues at the local, regional, and national levels. 15 figs., 13 tabs.

  12. Another look at the strategic petroleum reserve: Should its oil holdings be privatized?

    SciTech Connect (OSTI)

    Blumstein, C. [Univ. of California, Berkeley, CA (United States)] [Univ. of California, Berkeley, CA (United States); Komor, P. [E Source, Inc., Boulder, CO (United States)] [E Source, Inc., Boulder, CO (United States)

    1996-12-31T23:59:59.000Z

    The sharp increases in crude oil prices in the 1970`s unleashed a gusher of economic and policy analyses concerning energy security. A consensus emerged concerning the desirability of building and using a large stock of oil to cushion the effects of a sudden loss of oil supply. The author examines the validity of this large stock of oil considering changes in the oil market and whether the oil holdings of the Strategic Petroleum Reserve should be privatized. 12 refs.

  13. U.S. Department of Energy Naval Petroleum and Oil Shale Reserves combined financial statements, September 30, 1996 and 1995

    SciTech Connect (OSTI)

    NONE

    1997-03-01T23:59:59.000Z

    The Naval Petroleum and Oil Shale Reserves (NPOSR) produces crude oil and associated hydrocarbons from the Naval Petroleum Reserves (NPR) numbered 1, 2, and 3, and the Naval Oil Shale Reserves (NOSR) numbered 1, 2, and 3 in a manner to achieve the greatest value and benefits to the US taxpayer. NPOSR consists of the Naval Petroleum Reserve in California (NPRC or Elk Hills), which is responsible for operations of NPR-1 and NPR-2; the Naval Petroleum Oil Shale Reserve in Colorado, Utah, and Wyoming (NPOSR-CUW), which is responsible for operations of NPR-3, NOSR-1, 2, and 3 and the Rocky Mountain Oilfield Testing Center (RMOTC); and NPOSR Headquarters in Washington, DC, which is responsible for overall program direction. Each participant shares in the unit costs and production of hydrocarbons in proportion to the weighted acre-feet of commercially productive oil and gas formations (zones) underlying the respective surface lands as of 1942. The participating shares of NPR-1 as of September 30, 1996 for the US Government and Chevron USA, Inc., are listed. This report presents the results of the independent certified public accountants` audit of the Department of Energy`s (Department) Naval Petroleum and Oil Shale Reserves (NPOSR) financial statements as of September 30, 1996.

  14. EIS-0158-S2: Supplemental Environmental Impact Statement Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement, the supplement to DOE/EIS-0158, to analyze the environmental and socioeconomic impacts of the sale of Naval Petroleum Reserve No. 1 in Kern County, California to Occidental Petroleum Corporation.

  15. Characteristics of North Sea oil reserve appreciation

    E-Print Network [OSTI]

    Watkins, G. C.

    2000-01-01T23:59:59.000Z

    In many petroleum basins, and especially in more mature areas, most reserve additions consist of the growth over time of prior discoveries, a phenomenon termed reserve appreciation. This paper concerns crude oil reserve ...

  16. Report to Congress on the feasibility of establishing a heating oil component to the Strategic Petroleum Reserve. Volume 2: Appendices

    SciTech Connect (OSTI)

    NONE

    1998-06-01T23:59:59.000Z

    Nine appendices to the main report are included in this volume. They are: Northeastern US distillate supply systems; New England fuel oil storage capacities and inventories; Characteristics of the northeast natural gas market; Documentation of statistical models and calculation of benefits; Regional product reserve study; Other countries` experience with refined product storage; Global refining supply demand appraisal; Summary of federal authorities relevant to the establishment of petroleum product reserves; Product stability and turnover requirements.

  17. Office of Petroleum Reserves Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOilNEWResponse toOctober 2014 National,2008 MelanieEnergyPetroleum

  18. Petroleum Reserves Vision, Mission and Goals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOilNEWResponse(Expired) |CERCLACompensationSafety,B. LyonsPetroleum

  19. Report to Congress on the feasibility of establishing a heating oil component to the Strategic Petroleum Reserve. Volume 1

    SciTech Connect (OSTI)

    NONE

    1998-06-01T23:59:59.000Z

    In the Autumn of 1996, consumers and Members of Congress from the Northeast expressed concern about high prices for heating oil and historically low levels of inventories. Some Members of Congress advocated building a Federal inventory of heating oil as part of the Strategic Petroleum Reserve (SPR). Regional reserves are authorized as part of the SPR for import dependent regions by the Energy Policy and Conservation Act. In response, the Department of Energy (DOE) proposed a series of studies related to heating fuels, including a study of the desirability, feasibility, and cost of creating a Federal reserve containing distillate fuel. This report documents that study.

  20. Influence of physiography and vegetation on small mammals at the Naval Petroleum Reserves, California

    SciTech Connect (OSTI)

    Cypher, B.L.

    1995-02-13T23:59:59.000Z

    Influence of physiography and vegetation on small mammal abundance and species Composition was investigated at Naval Petroleum Reserve No. 1 in California to assess prey abundance for Federally endangered San Joaquin kit foxes (Vulpes macrotis mutica) and to assess the distribution of two Federal candidate species, San Joaquin antelope squirrels (Ammospermophilus nelsoni) and short-nosed kangaroo rats (Dinodomys nitratoides brevinasus). The specific objectives of this investigation were to determine whether small mammal abundance and community composition varied with north-south orientation, terrain, ground cover, and Cypher shrub density, and whether these factors influenced the distribution and abundance of San Joaquin antelope squirrels and short-nosed kangaroo rats.

  1. An analysis of increasing the size of the strategic petroleum reserve to one billion barrels

    SciTech Connect (OSTI)

    Not Available

    1990-01-01T23:59:59.000Z

    The Department of Energy's Office of Energy Emergency Policy and Evaluation requested that the Energy Information Administration complete an analysis of the proposed expansion in the Strategic Petroleum Reserve (SPR) from its currently planned size of 750 million barrels to 1000 million barrels. Because the SPR contains only 580 million barrels at this point in time, the benefits and costs of increasing the SPR from 600 to 750 million barrels were also estimated. This report documents the assumptions, methodology, and results of the analysis. 17 figs., 15 tabs.

  2. Update of assessment of geotechnical risks, strategic petroleum reserve, Weeks Island site

    SciTech Connect (OSTI)

    Bauer, S.J. [ed.

    1994-12-01T23:59:59.000Z

    This report is a critical reassessment of the geotechnical risks of continuing oil storage at the Weeks Island Strategic Petroleum Reserve site. It reviews all previous risk abatement recommendations, subsequent mitigative actions, and new information. Of increased concern, due to the discovery of a surface levels, is the long term maintainability of the mine as an oil storage repository. Mine operational changes are supported in order to facilitate monitoring of water entry diagnostics. These changes are also intended to minimize the volume in the mine available for water entry. Specific recommendations are made to implement the mine changes.

  3. Drawdown and distribution management manual for the Strategic Petroleum Reserve. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    The Drawdown Distribution Management Manual (DDMM) provides a comprehensive guide to the planning, preparation, and operational processes associated with an Strategic Petroleum Reserve (SPR) system response to an energy emergency. Although parts of the process may be unique to a particular situation, the manual describes a complete nominal response process by including those activities that would be common to most situations. While many of the same operational functions would apply, this process is not yet designed to fully accomodate SPR activities associated with the drawdown and delivery of crude oil which DOE has acquired and stored in the SPR on behalf of the Department of Defense (DOD).

  4. Endangered Species Program, Naval Petroleum Reserves in California. Annual report FY93

    SciTech Connect (OSTI)

    NONE

    1995-02-01T23:59:59.000Z

    The Naval Petroleum Reserves in California (NPRC) are operated by the US Department of Energy (DOE) and Chevron USA. Production Company (CPDN). Four federally-listed endangered animal species and one federally-threatened plant species are known to occur on NPRC: San Joaquin kit fox, blunt-nosed leopard lizard, giant kangaroo rat, Tipton kangaroo rat, and Hoover`s wooly-star. All five are protected under the Endangered Species Act of 1973, which declares that it is ``...the policy of Congress that all Federal departments and agencies shall seek to conserve endangered species and threatened species and shall utilize their authorities in furtherance of the purposes of the Act.`` DOE is also obliged to determine whether actions taken by their lessees on Naval Petroleum Reserve No. 2 will have any effects on endangered species or their habitats. The major objective of the EG&G Energy Measurements, Inc. Endangered Species Program on NPRC is to provide DOE with the scientific expertise necessary for compliance with the Endangered Species Act. The specific objective of this report is to summarize progress and results of the Endangered Species Program made during fiscal year 1993.

  5. Endangered species and cultural resources program, Naval Petroleum Reserves in California, annual report FY97

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    The Naval Petroleum Reserves in California (NPRC) are oil fields administered by the DOE in the southern San Joaquin Valley of California. Four federally endangered animal species and one federally threatened plant species are known to occur on NPRC: San Joaquin kit fox (Vulpes macrotis mutica), blunt-nosed leopard lizard (Gambelia silus), giant kangaroo rat (Dipodomys ingens), Tipton kangaroo rat (Dipodomys nitratoides), and Hoover`s wooly-star (Eriastrum hooveri). All five are protected under the Endangered Species Act (ESA) of 1973. The DOE/NPRC is obliged to determine whether actions taken by their lessees on Naval Petroleum Reserve No. 2 (NPR-2) will have any effects on endangered species or their habitats. The primary objective of the Endangered Species and Cultural Resources Program is to provide NPRC with the scientific expertise necessary for compliance with the ESA, the National Environmental Policy Act (NEPA), and the National Historic Preservation Act (NHPA). The specific objective of this report is to summarize progress, results, and accomplishments of the program during fiscal year 1997 (FY97).

  6. Expansion analyses of strategic petroleum reserve in Bayou Choctaw : revised locations.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Park, Byoung Yoon

    2010-11-01T23:59:59.000Z

    This report summarizes a series of three-dimensional simulations for the Bayou Choctaw Strategic Petroleum Reserve. The U.S. Department of Energy plans to leach two new caverns and convert one of the existing caverns within the Bayou Choctaw salt dome to expand its petroleum reserve storage capacity. An existing finite element mesh from previous analyses is modified by changing the locations of two caverns. The structural integrity of the three expansion caverns and the interaction between all the caverns in the dome are investigated. The impacts of the expansion on underground creep closure, surface subsidence, infrastructure, and well integrity are quantified. Two scenarios were used for the duration and timing of workover conditions where wellhead pressures are temporarily reduced to atmospheric pressure. The three expansion caverns are predicted to be structurally stable against tensile failure for both scenarios. Dilatant failure is not expected within the vicinity of the expansion caverns. Damage to surface structures is not predicted and there is not a marked increase in surface strains due to the presence of the three expansion caverns. The wells into the caverns should not undergo yield. The results show that from a structural viewpoint, the locations of the two newly proposed expansion caverns are acceptable, and all three expansion caverns can be safely constructed and operated.

  7. EIS-0021: Strategic Petroleum Reserve, Seaway Group Salt Domes, Brazoria County, Texas (also see EIS-0075-S and EIS-0029)

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Strategic Petroleum Reserve Office developed this statement to analyze the environmental impacts which would occur during site preparation and operation of oil storage facilities at each of five proposed candidate sites in the Seaway Group of salt domes.

  8. EIS-0020: Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California

    Broader source: Energy.gov [DOE]

    The Office of Naval Petroleum and Oil Shale Reserves developed this supplemental statement to evaluate the environmental impacts associated with a modified design of a proposed 250,000 barrels per day crude oil conveyance system from Navel Petroleum Reserve No. 1 to connect to the proposed SOHIO West Coast to Midcontinent Pipeline at Rialto, California. This SEIS is a supplement to DOE/EIS-0020, Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California.

  9. Resumption of SPR US Strategic Petroleum Reserve fill attached to synfuels bill

    SciTech Connect (OSTI)

    Not Available

    1980-06-23T23:59:59.000Z

    House-Senate conferees approved a bill which would establish a $20 billion US Synthetic Fuels Corp., a $3.1 billion bank to fund energy conservation and solar energy projects, a $1.4 billion biomass-to-energy program, and other energy conservation and production measures. An order requiring the filling of the SPR at a minimum average rate of 100,000 bbl/day beginning 10/1/80 was attached to the bill. If that rate is not achieved, the SPR measure requires that Elk Hills, Calif., field crude be sold or exchanged to acquire other crude for the SPR. Some OPEC members have threatened to reduce their output if the US buys oil for storage. The SPR measure will increase US refiners' crude-acquisition costs by $0.04/gal, which will be passed along to purchasers. The SPR goal is 750 million bbl of crude; current capacity is 250 million bbl, with only 91.7 million bbl in place. A House subcommittee issued a report recommending that the 118,000 bbl/day oil production from US National Petroleum Reserves (NPR) be reserved for the US Department of Defense (DOD) and stored in the SPR, but criticizing DOD for inefficiencies in its energy office, inadequate conversion to coal, and inadequate storage facilities.

  10. Chemistry and mineralogy of samples from the strategic petroleum reserve Bryan Mound site

    SciTech Connect (OSTI)

    Bild, R. W.

    1980-08-01T23:59:59.000Z

    The goal of the Strategic Petroleum Reserve (SPR) program is to protect the United States from a temporary cutoff of imported crude oil by stockpiling a reserve of oil in caverns in Gulf Coast salt domes. Some suitable caverns already exist as a result of solution mining activities by commercial mining companies. Most of the caverns for the program, however, will be solution mined specifically for the SPR program. The tasks assigned to Sandia National Laboratories include conducting a geotechnical program and providing interim technical support for the leaching of the first five caverns in the Bryan Mound, Texas, salt dome. This report describes chemical, mineralogical and petrological work done at Sandia as of May 1, 1980 in support of Bryan Mound activities. Samples of Bryan Mound salt cores, sidewall samples and drill cuttings have been subjected to chemical, mineralogical and petrographic analysis. Halite (NaCl) was the major mineral in all samples with anhydrite (CaSO/sub 4/) a common accessory. Minor or trace sylvite (KCl) and quartz (SiO/sub 2/) were detected in some sidewall samples. Other minor minerals found in drill cuttings included quartz; mixed carbonates of Fe, Ca and Mg; and several iron oxides. Possibly the carbonates are reaction products with the basic drilling mud or possibly pieces of caprock which contaminated the cuttings. The iron oxides were probably produced by corrosion of the drill stem or bit. Densities of several core samples were determined and insoluble residue was counted for radioactivity.

  11. Strategic Petroleum Reserve (SPR) geological site characterization report, Big Hill Salt Dome

    SciTech Connect (OSTI)

    Hart, R.J.; Ortiz, T.S.; Magorian, T.R.

    1981-09-01T23:59:59.000Z

    Geological and geophysical analyses of the Big Hill Salt Dome were performed to determine the suitability of this site for use in the Strategic Petroleum Reserve (SPR). Development of 140 million barrels (MMB) of storage capacity in the Big Hill Salt Dome is planned as part of the SPR expansion to achieve 750 MMB of storage capacity. Objectives of the study were to: (1) Acquire, evaluate, and interpret existing data pertinent to geological characterization of the Big Hill Dome; (2) Characterize the surface and near-surface geology and hydrology; (3) Characterize the geology and hydrology of the overlying cap rock; (4) Define the geometry and geology of the dome; (5) Determine the feasibility of locating and constructing 14 10-MMB storage caverns in the south portion of the dome; and (6) Assess the effects of natural hazards on the SPR site. Recommendations are included. (DMC)

  12. Naval petroleum reserves: Preliminary analysis of future net revenues from Elk Hills production

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    This is an interim report on the present value of the net revenues from Elk Hills Naval Petroleum Reserve. GAO calculated alternative present values of the net revenues applying (1) low, medium, and high forecasts of future crude oil prices and (2) alternative interest rates for discounting the future net revenues to their present values. The calculations are sensitive to both the oil price forecasts and discount rates used; they are preliminary and should be used with caution. They do not take into account possible added tax revenues collected by the government if Elk Hills were sold nor varying production levels and practices, which could either increase or decrease the total amount of oil that can be extracted.

  13. Brine-in-crude-oil emulsions at the Strategic Petroleum Reserve.

    SciTech Connect (OSTI)

    Nemer, Martin B.; Lord, David L.; MacDonald, Terry L.

    2013-10-01T23:59:59.000Z

    Metastable water-in-crude-oil emulsion formation could occur in a Strategic Petroleum Reserve (SPR) cavern if water were to flow into the crude-oil layer at a sufficient rate. Such a situation could arise during a drawdown from a cavern with a broken-hanging brine string. A high asphaltene content (> 1.5 wt %) of the crude oil provides the strongest predictor of whether a metastable water-in-crude-oil emulsion will form. However there are many crude oils with an asphaltene content > 1.5 wt % that don't form stable emulsions, but few with a low asphaltene content that do form stable emulsions. Most of the oils that form stable emulsions are %E2%80%9Csour%E2%80%9D by SPR standards indicating they contain total sulfur > 0.50 wt %.

  14. Naval Petroleum Reserves: assessment of alternative operating strategies beyond 1982. Analysis and supporting data

    SciTech Connect (OSTI)

    Gsellman, L.R.; Mendis, M.S.; Rosenberg, J.I.

    1981-06-01T23:59:59.000Z

    Legislation authorizing production from two of the Naval Petroleum Reserves, i.e., NPR-1 (Elk Hills, California) and NPR-3 (Teapot Dome, Wyoming), expires in 1982. This paper presents analyses and supporting data concerning the trade-offs of extending production or returning to a shut-in status in order to provide the Department of Energy with information needed to formulate a recommendation. The primary objective of the study is to evaluate a range of possible futures (through 1990) to determine technical, economic, energy, strategic and political trade-offs between the two options. A secondary objective is to develop a data base for use by DOE to respond to questions and issues raised by interested parties during executive branch and Congressional reviews.

  15. Naval petroleum reserves: Oil sales procedures and prices at Elk Hills, April through December 1986

    SciTech Connect (OSTI)

    Not Available

    1987-01-01T23:59:59.000Z

    The Elk Hills Naval Petroleum Reserve is located near Bakersfield, California and ranks seventh among domestic producing oil fields. In Feb. 1986 the Department of Energy awarded contracts to 16 companies for the sale of about 82,000 barrels per day of NPR crude oil between April and September 1986. These companies bid a record high average discount of $4.49 from DOE's base price. The discounts ranged from $0.87 to $6.98 per barrel. These contracts resulted in DOE selling Elk Hills oil as low as $3.91 per barrel. Energy stated that the process for selling from NPR had gotten out of step with today's marketplace. Doe subsequently revised its sales procedures which requires bidders to submit a specific price for the oil rather than a discount to a base price. DOE also initiated other efforts designed to avoid future NPR oil sales at less than fair market value.

  16. Environmental Survey preliminary report, Naval Petroleum Reserves in California (NPRC), Tupman, California

    SciTech Connect (OSTI)

    Not Available

    1989-02-01T23:59:59.000Z

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Naval Petroleum Reserves 1 (NPR-1) and 2 (NPR-2) in California (NPRC), conducted May 9--20, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPRC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at NPRC, and interviews with site personnel. 120 refs., 28 figs., 40 tabs.

  17. U.S. Strategic Petroleum Reserve Vapor Pressure Committee 2009 annual report.

    SciTech Connect (OSTI)

    Allen, Ray (Allen Energy Services, Inc., Longview, TX); Eldredge, Lisa (DynMcDermott Petroleum Operations, Harahan, LA); DeLuca, Charles (DynMcDermott Petroleum Operations, Harahan, LA); Mihalik, Patrick (DynMcDermott Petroleum Operations, Harahan, LA); Maldonado, Julio (U.S. Department of Energy, Harahan, LA); Lord, David L.; Rudeen, David Keith (GRAM, Inc., Albuquerque, NM); Berndsen, Gerard (U.S. Department of Energy, Harahan, LA)

    2010-05-01T23:59:59.000Z

    This report comprises an annual summary of activities under the U.S. Strategic Petroleum Reserve (SPR) Vapor Pressure Committee in FY2009. The committee provides guidance to senior project management on the issues of crude oil vapor pressure monitoring nd mitigation. The principal objectives of the vapor pressure program are, in the event of an SPR drawdown, to minimize the impact on the environment and assure worker safety and public health from crude oil vapor emissions. The annual report reviews key program areas ncluding monitoring program status, mitigation program status, new developments in measurements and modeling, and path forward including specific recommendations on cavern sampling for the next year. The contents of this report were first presented to SPR senior anagement in December 2009, in a deliverable from the vapor pressure committee. The current SAND report is an adaptation for the Sandia technical audience.

  18. Strategic Petroleum Reserve equation of state model development : current performance against measured data.

    SciTech Connect (OSTI)

    Lord, David L.; Rudeen, David Keith (GRAM, Inc., Albuquerque, NM)

    2010-07-01T23:59:59.000Z

    This report documents the progression of crude oil phase behavior modeling within the U.S. Strategic Petroleum Reserve vapor pressure program during the period 2004-2009. Improvements in quality control on phase behavior measurements in 2006 coupled with a growing body of degasification plant operations data have created a solid measurement baseline that has served to inform and significantly improve project understanding on phase behavior of SPR oils. Systematic tuning of the model based on proven practices from the technical literature have shown to reduce model bias and match observed data very well, though this model tuning effort is currently in process at SPR and based on preliminary data. The current report addresses many of the steps that have helped to build a strong baseline of data coupled with sufficient understanding of model features so that calibration is possible.

  19. Site geotechnical considerations for expansion of the Strategic Petroleum Reserve (SPR) to one billion barrels

    SciTech Connect (OSTI)

    Neal, J.T. (Sandia National Labs., Albuquerque, NM (United States)); Whittington, D.W. (USDOE Strategic Petroleum Reserve Project Management Office, New Orleans, LA (United States)); Magorian, T.R. (Magorian (Thomas R.), Amherst, NY (United States))

    1991-01-01T23:59:59.000Z

    Eight Gulf Coast salt domes have emerged as candidate sites for possible expansion of the Strategic Petroleum Reserve (SPR) to one billion barrels. Two existing SPR sites, Big Hill, TX, and Weeks Island, LA, are among the eight that are being considered. To achieve the billion barrel capacity, some 25 new leached caverns would be constructed, and would probably be established in two separate sites in Louisiana and Texas because of distribution requirements. Geotechnical factors involved in siting studies have centered first and foremost on cavern integrity and environmental acceptability, once logistical suitability is realized. Other factors have involved subsidence and flooding potential, loss of coastal marshlands, seismicity, brine injection well utility, and co-use by multiple operators. 5 refs., 11 figs., 2 tabs.

  20. Occurrence and distribution of special status plant species on the Naval Petroleum Reserves in California

    SciTech Connect (OSTI)

    Anderson, D.C.; Cypher, B.L.; Holmstead, G.L.; Hammer, K.L.; Frost, N.

    1994-10-01T23:59:59.000Z

    Several special status plant species occur or potentially occur at the Naval Petroleum Reserves in California (NPRC). Special status species are defined as those species that are either federally listed as endangered or threatened, or candidate taxa. Candidate species are classified as Category 1 or Category 2. Category 1 taxa are those species for which there is sufficient evidence to support listing, while Category 2 taxa are those species for which listing may possibly be appropriate, but for which sufficient data are lacking to warrant immediate listing. Determining the presence and distribution of these species on NPRC is necessary so that appropriate conservation or protection measures can be implemented. In the spring of 1988, a survey of Naval Petroleum Reserve No. 1 (NPR-1) was conducted to determine the occurrence of Hoover`s wooly-star (Eriastrum hooveri), Kern Mallow (Eremalche kemensis), San Joaquin wooly-threads (Lembertia congdonii), and California jewelflower (Caulanthus califonicus), all listed by the US Fish and Wildlife Service (FWS) as Category 2 species at that time. Of the four species, only Hoover`s wooly-star was found. It was concluded that Kern mallow and San Joaquin wooly-threads could potentially be found on NPR-1, but habitat for California jewelflower did not occur on NPR-1 and its occurrence was unlikely. As part of an ongoing effort to document the presence or absence of sensitive plant species on NPRC, surveys for species other than Hoover`s wooly-star were conducted in the spring of 1993. Abundant spring rains in 1993 created favorable growing conditions for annual forbs. Surveys in 1993 focused on potential habitat of several endangered and candidate species. The results of those surveys are presented in this report.

  1. Three-dimensional representations of salt-dome margins at four active strategic petroleum reserve sites.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Stein, Joshua S.

    2003-01-01T23:59:59.000Z

    Existing paper-based site characterization models of salt domes at the four active U.S. Strategic Petroleum Reserve sites have been converted to digital format and visualized using modern computer software. The four sites are the Bayou Choctaw dome in Iberville Parish, Louisiana; the Big Hill dome in Jefferson County, Texas; the Bryan Mound dome in Brazoria County, Texas; and the West Hackberry dome in Cameron Parish, Louisiana. A new modeling algorithm has been developed to overcome limitations of many standard geological modeling software packages in order to deal with structurally overhanging salt margins that are typical of many salt domes. This algorithm, and the implementing computer program, make use of the existing interpretive modeling conducted manually using professional geological judgement and presented in two dimensions in the original site characterization reports as structure contour maps on the top of salt. The algorithm makes use of concepts of finite-element meshes of general engineering usage. Although the specific implementation of the algorithm described in this report and the resulting output files are tailored to the modeling and visualization software used to construct the figures contained herein, the algorithm itself is generic and other implementations and output formats are possible. The graphical visualizations of the salt domes at the four Strategic Petroleum Reserve sites are believed to be major improvements over the previously available two-dimensional representations of the domes via conventional geologic drawings (cross sections and contour maps). Additionally, the numerical mesh files produced by this modeling activity are available for import into and display by other software routines. The mesh data are not explicitly tabulated in this report; however an electronic version in simple ASCII format is included on a PC-based compact disk.

  2. Wildlife management plan, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    O'Farrell, T.P.; Scrivner, J.H.

    1987-01-01T23:59:59.000Z

    Under the Naval Petroleum Act of 1976, Congress directed the Secretary of the Navy and subsequently the Secretary of Energy, to produce petroleum products from Naval Petroleum Reserve No. 1 (NPR-1) in Kern County, California, at the maximum efficient rate consistent with sound engineering practices. Because of the presence of two endangered species and the quality, quantity, and contiguous nature of habitat on NPR-1, the area is unique and management of its resources deserves special attention. The purpose of this wildlife management plan is to: (1) draw together specific information on NPR-1 wildlife resources; (2) suggest management goals that could be implemented, which if achieved, would result in diverse, healthy wildlife populations; and (3) reinitiate cooperative agreements between the US Department of Energy (DOE) and other conservation organizations regarding the management of wildlife on NPR-1. NPR-1 supports an abundant and diverse vertebrate fauna. Twenty-five mammalian, 92 avian, eight reptilian, and two amphibian species have been observed on Elk Hills. Of these, three are endangered (San Joaquin kit fox, Vulpes macrotis mutica; giant kangaroo rat, Dipodomys ingens; blunt-nosed leopard lizard, Gambelia silus). Nine vertebrates, six invertebrates, and four plant species known to occur or suspected of occurring on Elk Hills are potential candidates for listing. A major objective of this management plan is to minimize the impact of petroleum development activities on the San Joaquin kit fox, giant kangaroo rat, blunt-nosed leopard lizard, and their essential habitats. This will mainly be achieved by monitoring the status of these species and their habitat and by restoring disturbed habitats. In general, management policies designed to benefit the above three species and other species of concern will also benefit other wildlife inhabiting NPR-1.

  3. Final sitewide environmental assessment for continued development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

    SciTech Connect (OSTI)

    NONE

    1995-07-01T23:59:59.000Z

    The Secretary of Energy is required by law to explore, prospect, conserve, develop, use, and operate the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum Reserves Production Act of 1976 (Public Law 94-258), requires that the Naval Petroleum Reserves be produced at their maximum efficient rate (MER), consistent with sound engineering practices, for a period of six years. To fulfill this mission, DOE is proposing continued development activities which would include the drilling of approximately 250 oil production and injection (gas, water, and steam) wells, the construction of between 25 and 30 miles of associated gas, water, and steam pipelines, the installation of several production and support facilities, and the construction of between 15 and 20 miles of access roads. These drilling and construction estimates include any necessary activities related to the operation of the Rocky Mountain Oilfield Testing Center (RMOTC). The purpose of RMOTC will be to provide facilities and necessary support to government and private industry for testing and evaluating new oilfield and environmental technologies, and to transfer these results to the petroleum industry through seminars and publications. Continued development activities either have no potential to result in adverse environmental impacts or would only result in adverse impacts that could be readily mitigated. The small amounts of disturbed surface area will be reclaimed to its original natural state when production operations terminate. The preparation of an environmental impact statement is not required, and the DOE is issuing this Finding of No Significant Impact (FONSI). 73 refs.

  4. EA-1956: Site-Wide Environmental Assessment for the Divestiture of Rocky Mountain Oilfield Testing Center and Naval Petroleum Reserve No. 3, Natrona County, Wyoming

    Broader source: Energy.gov [DOE]

    DOE prepared an EA that assesses the potential environmental impacts of the proposed discontinuation of DOE operations at the Rocky Mountain Oilfield Testing Center (RMOTC) and the proposed divestiture of Naval Petroleum Reserve Number 3 (NPR-3)

  5. EIS-0024: Strategic Petroleum Reserve, Capline Group Salt Domes, Iberia, Napoleonville, Weeks Island Expansion, Bayou Choctaw Expansion, Chacahoula- Iberia, Iberville, and Lafourche Parishes, Louisiana

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserves developed this EIS to analyze the environmental impacts which would occur during site preparation and operation of oil storage facilities at each of five proposed candidate sites in the Capline Group of salt domes.

  6. Production accounting and controls at the Naval Petroleum Reserve No. 1, Elk Hills, California

    SciTech Connect (OSTI)

    Not Available

    1987-07-17T23:59:59.000Z

    Purpose of the audit was to determine if the Reserve's crude oil and gas products were properly accounted for and controlled from well-head to ultimate use or sale and physical controls and security measures at the Reserve were sufficient to ensure that Government assets were safeguarded as required. Our review showed that the Reserve used sales rather than actual production as the basis for its production accounting process. This method of accounting gave the Reserve only an approximation of the oil and gas it produced. Security measures had been significantly improved since the Reserve was opened; however, there were certain well and tank site areas which were not adequately secured and safeguarded against loss. During the course of the audit, management took prompt action to enhance security procedures.

  7. Reservoir analysis study, Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 2 report, Volume 1

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    Jerry R. Bergeso and Associates, Inc. (Bergeson) has completed Phase II of the Reservoir Analysis, Naval Petroleum Reserve Number 1, Elk Hills Oilfield, California. The objectives for this phase of the study included the establishment of revised estimates of the original oil and gas-in-place for each of the zones/reservoirs, estimation of the remaining proved developed, proved undeveloped, probable and possible reserves, and assessment of the effects of historical development and production operations and practices on recoverable reserves. Volume one contains the following: summary; introduction; and reservoir studies for tulare, dry gas zone, eastern shallow oil zone, western shallow oil zone, and Stevens --MBB/W31S, 31S NA/D.

  8. West Hackberry Strategic Petroleum Reserve site brine-disposal monitoring, Year I report. Volume III. Biological oceanography. Final report

    SciTech Connect (OSTI)

    DeRouen, L.R.; Hann, R.W.; Casserly, D.M.; Giammona, C.; Lascara, V.J. (eds.)

    1983-02-01T23:59:59.000Z

    The Department of Energy's Strategic Petroleum Reserve Program began discharging brine into the Gulf of Mexico from its West Hackberry site near Cameron, Louisiana in May 1981. The brine originates from underground salt domes being leached with water from the Intracoastal Waterway, making available vast underground storage caverns for crude oil. The effects of brine discharge on aquatic organisms are presented in this volume. The topics covered are: benthos; nekton; phytoplankton; zooplankton; and data management.

  9. Naval Petroleum Reserve Number 1 financial statements September 30, 1997 and 1996 (with independent auditors` report thereon)

    SciTech Connect (OSTI)

    NONE

    1997-12-31T23:59:59.000Z

    The Naval Petroleum and Oil Shale Reserves (NPOSR) produces crude oil and associated hydrocarbons from the Naval Petroleum Reserve No. 1 (NPR-1) in a manner to achieve the greatest value and benefits to the US taxpayer. As required by the 1996 National Defense Authorization Act, the Department of Energy offered NPR-1 for sale during FY 1997. DOE structured the sale so as to offer two types of ownership segments: one operatorship segment, consisting of 74% of the US interest in NPR-1, and 13 nonoperating segments, each consisting of 2% of the US interest. Potential purchasers could bid on one, some, or all of the segments. If a single purchaser wanted to buy all of the Government`s interest, then its bid would have to exceed the total of the highest bids for all of the individual segments. Bids were due October 1, 1997, at which time DOE received 22 bids from 15 parties acting alone or in concert. The report and management letter present the results of the independent certified public accountants` audits of the Department of Energy`s Naval Petroleum Reserve Number 1 (NPR-1) financial statements as of, and for the years ended, September 30, 1997 and 1996.

  10. Reservoir analysis study, Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 2 report, Executive summary

    SciTech Connect (OSTI)

    Not Available

    1988-07-01T23:59:59.000Z

    The Naval Petroleum Reserve No. 1 (Elk Hills) is located in Kern County, California, and is jointly owned by the US Department of Energy and Chevron USA Inc. The Elk Hills Field is presently producing oil and gas from five geologic zones. These zones contain a number of separate and geologically complex reservoirs. Considerable field development and production of oil and gas have occurred since initial estimates of reserves were made. Total cumulative field production through December 1987 is 850 MMBbls of oil, 1.2 Tcf of gas and 648.2 MMBbls of water. In December 1987, field producing rates expressed on a calendar day basis amounted to 110,364 BOPD, 350,946 Mcfd and 230,179 BWPD from 1157 producers. In addition, a total of two reservoirs have gas injection in progress and four reservoirs have water injection in progress and four reservoirs have water injection in progress. Cumulative gas and water injection amounted to 586 Bcf of gas and 330 MMB of water. December 1987 gas and water injection rates amounted to 174 MMcfd and 234 MBWPD, into 129 injectors. In addition, a steamflood pilot program is currently active in the Eastern Shallow Oil Zone. Jerry R. Bergeson and Associates, Inc. (Bergeson) has completed Phase II of the Reservoir Analysis, Naval Petroleum Reserve Number 1, Elk Hills Oilfield, California. The objectives for this phase of the study included the establishment of revised estimates of the original oil and gas-in-place for each of the zones/reservoirs, estimation of the remaining proved developed, proved undeveloped, probable and possible reserves, and assessment of the effects of historical development and production operations and practices on recoverable reserves. 28 figs., 37 tabs.

  11. Environmental assessment of oil degasification at four Strategic Petroleum Reserve facilities in Texas and Louisiana

    SciTech Connect (OSTI)

    Not Available

    1994-09-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) proposes to treat gassy oil at four Strategic Petroleum Reserve (SPR) storage sites to lower the gas content of the stored crude oil and help ensure safe transfer of the oil during drawdown. The crude oil is stored underground in caverns created in salt domes. The degree of gassiness of the oil varies substantially among sites and among caverns within a site. This environmental assessment describes the proposed degasification operation, its alternatives, and potential environmental impacts. The need for degasification has arisen because over time, gases, principally methane and nitrogen, have migrated into and become dissolved in the stored crude oil. This influx of gas has raised the crude oil vapor pressure above limits required by safety and emission guidelines. When oil is drawn from the caverns, excess gases may come out of solution. Based on preliminary data from an ongoing sampling program, between 200 and 350 million of the 587 million barrels of crude oil stored at these four sites would require processing to remove excess gas. Degasification, a commonly used petroleum industry process, would be done at four crude oil storage facilities: Bryan Mound and Big Hill in Texas, and West Hackberry and Bayou Choctaw in Louisiana. DOE would use a turnkey services contract for engineering, procurement, fabrication, installation, operation and maintenance of two degasification plants. These would be installed initially at Bryan Mound and West Hackberry. Degasification would be complete in less than three years of continuous operations. This report summarizes the environmental impacts of this gasification process.

  12. Summary of Degas II performance at the US Strategic Petroleum Reserve Big Hill site.

    SciTech Connect (OSTI)

    Rudeen, David K. (GRAM, Inc., Albuquerque, NM); Lord, David L.

    2007-10-01T23:59:59.000Z

    Crude oil stored at the US Strategic Petroleum Reserve (SPR) requires mitigation procedures to maintain oil vapor pressure within program delivery standards. Crude oil degasification is one effective method for lowering crude oil vapor pressure, and was implemented at the Big Hill SPR site from 2004-2006. Performance monitoring during and after degasification revealed a range of outcomes for caverns that had similar inventory and geometry. This report analyzed data from SPR degasification and developed a simple degas mixing (SDM) model to assist in the analysis. Cavern-scale oil mixing during degassing and existing oil heterogeneity in the caverns were identified as likely causes for the range of behaviors seen. Apparent cavern mixing patterns ranged from near complete mixing to near plug flow, with more mixing leading to less efficient degassing due to degassed oil re-entering the plant before 100% of the cavern oil volume was processed. The report suggests that the new cavern bubble point and vapor pressure regain rate after degassing be based on direct in-cavern measurements after degassing as opposed to using the plant outlet stream properties as a starting point, which understates starting bubble point and overstates vapor pressure regain. Several means to estimate the cavern bubble point after degas in the absence of direct measurement are presented and discussed.

  13. Naval Petroleum Reserves in California site environmental report for calendar year 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    This summary for Naval Petroleum Reserves in California (NPRC) is divided into NPR-1 and NPR-2. Monitoring efforts at NPR-1 include handling and disposal of oilfield wastes; environmental preactivity surveys for the protection of endangered species and archaeological resources; inspections of topsoil stockpiling; monitoring of revegetated sites; surveillance of production facilities for hydrocarbons and oxides of nitrogen (NO{sub x}) emissions; monitoring of oil spill prevention and cleanup; and monitoring of wastewater injection. No major compliance issues existed for NPR-1 during 1989. Oil spills are recorded, reviewed for corrective action, and reported. Environmental preactivity surveys for proposed projects which may disturb or contaminate the land are conducted to prevent damage to the federally protected San Joaquin kit fox, blunt-nosed leopard lizard, Tipton kangaroo rat and the giant kangaroo rat. Projects are adjusted or relocated as necessary to avoid impact to dens, burrows, or flat-bottomed drainages. A major revegetation program was accomplished in 1989 for erosion control enhancement of endangered species habitat. The main compliance issue on NPR-2 was oil and produced water discharges into drainages by lessees. An additional compliance issue on NPR-2 is surface refuse from past oilfield operations. 17 refs.

  14. Environmental Survey preliminary report, Strategic Petroleum Reserve, Texas and Louisiana Gulf Coast

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Strategic Petroleum Reserve (SPR), located in Louisiana and Texas, and conducted in two segments from November 30 through December 11, 1987, and February 1 through 10, 1988. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with SPR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at SPR, and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the SPR Survey findings for inclusion into the Environmental Survey Summary Report. The Summary Report will reflect the final determinations of the SPR Survey and the other DOE site-specific Surveys. 200 refs., 50 figs., 30 tabs.

  15. Endangered species and cultural resources program Naval petroleum Reserves in California. Annual report FY96

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    In FY96, Enterprise Advisory Services, Inc. (EASI) continued to support efforts to protect endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on federal properties. Population monitoring activities were conducted for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover`s wooly-star. Kit fox abundance and distribution was assessed by live-trapping over a 329-km{sup 2} area. Kit fox reproduction and mortality were assessed by radiocollaring and monitoring 22 adults and two pups. Reproductive success and litter size were determined through live-trapping and den observations. Rates and sources of kit fox mortality were assessed by recovering dead radiocollared kit foxes and conducting necropsies to determine cause of death. Abundance of coyotes and bobcats, which compete with kit foxes, was determined by conducting scent station surveys. Kit fox diet was assessed through analysis of fecal samples collected from live-trapped foxes. Abundance of potential prey for kit foxes was determined by conducting transect surveys for lagornorphs and live-trapping small mammals.

  16. Strategic Petroleum Reserve annual site environmental report for calendar year 1992

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    This report, provided annually in accordance with DOE Order 5400.1, summarizes monitoring data collected to assess Strategic Petroleum Reserve (SPR) impacts on the environment. The report serves as a management tool for mitigating such impacts, thus serving the public interest by ensuring environmentally sound operation of the SPR. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1992. The active permits and the results of the environmental monitoring program (i.e., air, surface water, ground water, and water discharges) are discussed within each section by site. The quality assurance program is presented which includes results from laboratory and field audits and studies performed internally and by regulatory agencies. In general, no significant adverse environmental impact resulted from any SPR activities during 1992. Environmental areas of concern, such as potential ground water contamination, are fully addressed in the applicable section by site. The SPR continues to maintain an overall excellent environmental record.

  17. Final state of the Strategic Petroleum Reserve (SPR) Weeks Island Mine

    SciTech Connect (OSTI)

    MOLECKE,MARTIN A.

    2000-02-01T23:59:59.000Z

    This report documents the decommissioning and abandonment activities at the Weeks Island Strategic Petroleum Reserve (SPR) site, Iberia Parish, Louisiana, that were concluded in 1999. These activities required about six years of intense operational, engineering, geotechnical, and management support efforts, following initiation of site abandonment plans in 1994. The Weeks Island SPR mine stored about 72.5 million bbl of crude oil following oil fill in 1980--1982, until November 1995, when the DOE initiated oil drawdown procedures, with brine refill and oil skimming, and numerous plugging and sealing activities. About 98% of the crude oil was recovered and transferred to other SPR facilities in Louisiana and Texas; a small amount was also sold. This document summarizes recent pre- and post-closure: conditions of surface features at the site, including the sinkholes, the freeze wall, surface subsidence measurements and predictions; conditions within the SPR mine, including oil recovery, brine filling, and the Markel Wet Drift; risk assessment evaluations relevant to the decommissioning and long-term potential environmental impacts; continuing environmental monitoring activities at the site; and, an overview on the background and history of the Weeks Island SPR facility.

  18. Sinkhole progression at the Weeks Island, Louisiana, Strategic Petroleum Reserve (SPR) site

    SciTech Connect (OSTI)

    Neal, J.T.; Bauer, S.J.; Ehgartner, B.L. [Sandia National Labs., Albuquerque, NM (United States). Underground Storage Technology Dept.

    1995-11-01T23:59:59.000Z

    A sinkhole measuring 11 m (36 ft) across and 9 m (30 ft) deep was first observed in alluvium overlying the Weeks Island, Louisiana, salt dome in May 1992, but it was about a year old, based on initial surface appearance and subsequent reverse extrapolation of growth rates. A second and much smaller sinkhole was identified in early 1995, nearly three years later. Their position directly over the edges of the SPR oil storage chamber, a former room-and-pillar salt mine, caused apprehension. The association of sinkholes over mines is well established and this occurrence suggested that groundwater influx undoubtedly was causing salt dissolution at shallow depth, and associated collapse of soil at the surface. Leaks of groundwater into other salt mines in Louisiana and elsewhere led to flooding and eventual abandonment (Coates et al., 1981). Consequently, much attention has been and continues to be given to characterizing these sinkholes, and to mitigation. This paper summarizes current engineering geologic concepts, and briefly describes diagnostic and risk mitigation efforts being conducted by the US Department of Energy, operator of the Strategic Petroleum Reserve (Bauer et al., 1994).

  19. Results of the Weeks Island Strategic Petroleum Reserve Oil Leak Risk Assessment Study

    SciTech Connect (OSTI)

    Molecke, M.A.; Hinkebein, T.E.; Bauer, S.J.; Linn, J.K.

    1999-01-01T23:59:59.000Z

    This study evaluated multiple, long-term environmental oil-contamination risk scenarios that could result from the potential leakage of UP to 1.5 million barrels of crude oil entombed in the Weeks Island SPR mine following site decommissioning and abandonment, and up to 100 years thereafter. This risk assessment also provides continuity with similar risk evaluations performed earlier and documented in the 1995 DOE Environmental Assessment for Decommissioning the Strategic Petroleum Reserve Weeks Island Facility (EA). This current study was requested by the DOE to help them determine if their previous Finding of No Significant Impact (FONSI), in the EA, is still valid or needs to be rescinded. Based on the calculated environmental risk results (in terms of clean-up and remediation expenses) presented in this risk assessment, including the calculated average likelihoods of oil release and potential oil-leakage volumes, none of the evaluated risk events would appear to satisfy the definition of significant environmental impact in National Environmental Policy Act (NEPA) terminology. The DOE may combine these current results with their earlier evaluations and interpretations in the 1995 EA in order to assess whether the existing FONSI is still accurate, acceptable, and valid. However, from a risk evaluation standpoint, the assessment of impacts appears to be the same whether only 10,000 to 30,000 barrels of crude oil (as considered in the 1995 EA), or up to 1.5 million barrels of oil (as considered herein) are abandoned in the Weeks Island SPR facility.

  20. Interface modeling to predict well casing damage for big hill strategic petroleum reserve.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Park, Byoung Yoon

    2012-02-01T23:59:59.000Z

    Oil leaks were found in well casings of Caverns 105 and 109 at the Big Hill Strategic Petroleum Reserve site. According to the field observations, two instances of casing damage occurred at the depth of the interface between the caprock and top of salt. This damage could be caused by interface movement induced by cavern volume closure due to salt creep. A three dimensional finite element model, which allows each cavern to be configured individually, was constructed to investigate shear and vertical displacements across each interface. The model contains interfaces between each lithology and a shear zone to examine the interface behavior in a realistic manner. This analysis results indicate that the casings of Caverns 105 and 109 failed by shear stress that exceeded shear strength due to the horizontal movement of the top of salt relative to the caprock, and tensile stress due to the downward movement of the top of salt from the caprock, respectively. The casings of Caverns 101, 110, 111 and 114, located at the far ends of the field, are predicted to be failed by shear stress in the near future. The casings of inmost Caverns 107 and 108 are predicted to be failed by tensile stress in the near future.

  1. Report to the President on agreements and programs relating to the Naval Petroleum and Oil Shale Reserves

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    The Department of Energy monitors commercial natural gas production activities along the boundaries of Naval Oil Shale Reserve No. 1 and Naval Oil Shale Reserve No. 3, which are located in Garfield County, Colorado, and were created in the early part of this century to provide a future source of shale oil for the military. In response to the private sector`s drilling of natural gas wells along the south and southwest boundaries of the Reserves, which began in the early 1980`s, the Department developed a Natural Gas Protection Program to protect the Government`s resources from drainage due to the increasing number of commercial gas wells contiguous to Naval Oil Shale Reserve No. 3. This report provides an update of the Gas Protection Program being implemented and the agreements that have been placed in effect since December 19, 1991, and also includes the one communitized well containing Naval Petroleum Reserve No. 3 lands. The Protection Program employs two methods to protect the Government`s resources: (1) sharing with the private sector in the costs and production of wells by entering into ``communitization`` agreements; and (2) drilling wholly-owned Government wells to ``offset`` commercial wells that threaten to drain natural gas from the Reserves. The methods designed to protect the Government`s resources are achieving their objective of abating gas drainage and migration. As a result of the Protection Program, the Department of Energy is able to produce natural gas and either sell its share on the open market or transfer it for use at Government facilities. The Natural Gas Protection Program is a reactive, ongoing program that is continually revised as natural gas transportation constraints, market conditions, and nearby commercial production activities change.

  2. Phase II - final report study of alternatives for future operations of the naval petroleum and oil shale reserves NPR-3, Wyoming

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) has asked Gustavson Associates, Inc. to serve as an Independent Petroleum Appraiser under contract DE-AC01-96FE64202. This authorizes a study and recommendations regarding future development of Naval Petroleum Reserve No. 3 (NPR-3) in Natrona County, Wyoming. The report that follows is the Phase II Final Report for that study.

  3. Five-year resurvey for endangered species on Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    O'Farrell, T.P.; Mathews, N.E.

    1987-09-01T23:59:59.000Z

    A transect survey of Naval Petroleum Reserve No. 1 (NPR-1), Kern County, California, was conducted in 1984 to determine the distribution and relative abundance of endangered species and other wildlife. A total of 589.8 miles of transects were walked through approximately 47,235 acres in all or parts of 81 sections. A total of 16,401 observations of 58 species of wildlife were made which demonstrated the richness and abundance of wildlife on NPR-1 in spite of the intensity of recent petroleum developments. Although most construction activities associated with increased petroleum production took place between the first transect survey in 1979 and this resurvey, no adverse changes in relative densities of kit fox dens, prey base, or other wildlife were observed. NPR-1 should be resurveyed again in 1989. 33 refs., 5 figs., 13 tabs.

  4. Environmental Survey preliminary report, Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming, Casper, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1989-02-01T23:59:59.000Z

    This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW) conducted June 6 through 17, 1988. NPOSR consists of the Naval Petroleum Reserve No. 3 (NPR-3) in Wyoming, the Naval Oil Shale Reserves No. 1 and 3 (NOSR-1 and NOSR-3) in Colorado and the Naval Oil Shale Reserve No. 2 (NOSR-2) in Utah. NOSR-2 was not included in the Survey because it had not been actively exploited at the time of the on-site Survey. The Survey is being conducted by an interdisciplinary team of environmental specialists, lead and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPOSR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at NPOSR and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified at NOSR-3 during the on-site Survey. There were no findings associated with either NPR-3 or NOSR-1 that required Survey-related sampling and Analysis. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the Environmental Survey Summary report. The Summary Report will reflect the final determinations of the NPOSR-CUW Survey and the other DOE site-specific Surveys. 110 refs., 38 figs., 24 tabs.

  5. Greybull Sandstone Petroleum Potential on the Crow Indian Reservation, South-Central Montana

    SciTech Connect (OSTI)

    Lopez, David A.

    2002-05-13T23:59:59.000Z

    The focus of this project was to explore for stratigraphic traps that may be present in valley-fill sandstone at the top of the Lower Cretaceous Kootenai Formation. This sandstone interval, generally known as the Greybull Sandstone, has been identified along the western edge of the reservation and is a known oil and gas reservoir in the surrounding region. The Greybull Sandstone was chosen as the focus of this research because it is an excellent, well-documented, productive reservoir in adjacent areas, such as Elk Basin; Mosser Dome field, a few miles northwest of the reservation; and several other oil and gas fields in the northern portion of the Bighorn Basin.

  6. Temperatures and interval geothermal-gradient determinations from wells in National Petroleum Reserve in Alaska

    SciTech Connect (OSTI)

    Blanchard, D.C.; Tailleur, I.L.

    1983-12-15T23:59:59.000Z

    Temperature and related records from 28 wells in the National Petroleum Reserve in Alaska (NPRA) although somewhat constrained from accuracy by data gathering methods, extrapolate to undisturbed formation temperatures at specific depths below permafrost, and lead to calculated geothermal graidents between these depths. Tabulation of the results show that extrapolated undisturbed temperatures range from a minimum of 98/sup 0/F (37/sup 0/C) at 4000 feet (1220 m) to a maximum of 420/sup 0/F (216/sup 0/C) at 20,260 feet (6177 m) and that geothermal gradients range from 0.34/sup 0/F/100' (6/sup 0/C/km) between 4470 feet to 7975 feet (Lisburne No. 1) and 3.15/sup 0/F/100' (57/sup 0/C/km) between 6830 feet to 7940 feet (Drew Point No. 1). Essential information needed for extrapolations consists of: time-sequential bottom-hole temperatures during wire-line logging of intermediate and deep intervals of the borehole; the times that circulating drilling fluids had disturbed the formations; and the subsequent times that non-circulating drilling fluids had been in contact with the formation. In several wells presumed near direct measures of rock temperatures recorded from formation fluids recovered by drill stem tests (DST) across thin (approx. 10-20 foot) intervals are made available. We believe that the results approach actual values close enough to serve as approximations of the thermal regimes in appropriate future investigations. Continuous temperature logs obtained at the start and end of final logging operations, conductivity measurements, and relatively long-term measurements of the recovery from disturbance at shallow depths in many of the wells will permit refinements of our values and provide determination of temperatures at other depths. 4 references, 6 figures, 3 tables.

  7. Endangered species program Naval Petroleum Reserves in California. Annual report FY94

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    In FY94, EG and G Energy Measurements, Inc. (EG and G/EM) continued to support efforts to conserve endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on Federal properties. Population monitoring activities are conducted annually for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover`s wooly star. To mitigate impacts of oil field activities on listed species, 400 preactivity surveys covering approximately 315 acres were conducted in FY94. Mitigation measures implemented as a result of survey findings resulted in avoidance of incidental takes of listed species during construction activities. EG and G/EM also assisted with mitigating effects from third-party projects, primarily by conducting biological and cultural resource consultations with regulatory agencies. Third-party projects in FY94 included three pipeline projects and two well abandonment/clean-up projects. Cultural resource support provided to NPRC consisted primarily of conducting preliminary surveys for cultural resources, and preparing a Cultural Resource Management Plan and Programmatic Agreement for NPR-1. These two documents will be finalized in FY95. EG and G/EM has conducted an applied habitat reclamation program at NPRC since 1985. In FY94, an evaluation of revegetation rates on reclaimed and non-reclaimed disturbed lands was initiated to assess reclamation efficacy. Results will be used to direct future habitat reclamation efforts at NPRC. In addition to this effort, 347 reclaimed sites were assessed to evaluate reclamation success.

  8. Conservation plan for protected species on Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    Otten, M.R.M.; Cypher, B.L.

    1997-07-01T23:59:59.000Z

    Habitats in and around Naval Petroleum Reserve No. 1 (NPR-1) support populations of various vertebrates and plants, including a number of threatened and endangered species. Adequate conservation of habitats and species, particularly protected species, can be facilitated through development and implementation of management plans. This document provides a comprehensive plan for the conservation of protected species on NPR-1, through compliance with terms and conditions expressed in Biological Opinions rendered by the U.S. Fish and Wildlife Service for NPR-1 activities. Six conservation strategies by which threatened and endangered species have been, and will be, protected are described: population monitoring, mitigation strategies, special studies, operating guidelines and policies, information transfer and outreach, and the endangered species conservation area. Population monitoring programs are essential for determining population densities and for assessing the effects of oil field developments and environmental factors on protected species. Mitigation strategies (preactivity surveys and habitat reclamation) are employed to minimize the loss of important habitats components and to restore previously disturbed lands to conditions more suitable for species` use. A number of special studies were undertaken between 1985 and 1995 to investigate the effectiveness of a variety of population and habitat management techniques with the goal of increasing the density of protected species. Operating guidelines and policies governing routine oil field activities continue to be implemented to minimize the potential for the incidental take of protected species and minimize damage to wildlife habitats. Information transfer and outreach activities are important means by which technical and nontechnical information concerning protected species conservation on NPR-1 is shared with both the scientific and non-scientific public.

  9. Endangered species and cultural resources program, Naval Petroleum Reserves in California: Annual report FY95

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    In FY95, EG and G Energy Measurements, Inc. (EG and G/EM) continued to support efforts to protect endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on Federal properties. Population monitoring activities are conducted annually for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover`s wooly-star. To mitigate impacts of oil field activities on listed species, 674 preactivity surveys covering approximately 211 hectares (521 acres) were conducted in FY95. EG and G/EM also assisted with mitigating effects from third-party projects, primarily by conducting biological and cultural resource consultations with regulatory agencies. EG and G/EM has conducted an applied habitat reclamation program at NPRC since 1985. In FY95, an evaluation of revegetation rates on reclaimed and non-reclaimed disturbed lands was completed, and the results will be used to direct future habitat reclamation efforts at NPRC. In FY95, reclamation success was monitored on 50 sites reclaimed in 1985. An investigation of factors influencing the distribution and abundance of kit foxes at NPRC was initiated in FY94. Factors being examined include habitat disturbance, topography, grazing, coyote abundance, lagomorph abundance, and shrub density. This investigation continued in FY95 and a manuscript on this topic will be completed in FY96. Also, Eg and G/EM completed collection of field data to evaluate the effects of a well blow-out on plant and animal populations. A final report will be prepared in FY96. Finally, EG and G/EM completed a life table analysis on San Joaquin kit foxes at NPRC.

  10. Analysis of crude oil vapor pressures at the U.S. Strategic Petroleum Reserve.

    SciTech Connect (OSTI)

    Rudeen, David Keith (GRAM, Inc., Albuquerque, NM); Lord, David L.

    2005-08-01T23:59:59.000Z

    Crude oil storage caverns at the U.S. Strategic Petroleum Reserve (SPR) are solution-mined from subsurface salt domes along the U.S. Gulf Coast. While these salt domes exhibit many attractive characteristics for large-volume, long-term storage of oil such as low cost for construction, low permeability for effective fluids containment, and secure location deep underground, they also present unique technical challenges for maintaining oil quality within delivery standards. The vapor pressures of the crude oils stored at SPR tend to increase with storage time due to the combined effects of geothermal heating and gas intrusion from the surrounding salt. This presents a problem for oil delivery offsite because high vapor-pressure oil may lead to excessive atmospheric emissions of hydrocarbon gases that present explosion hazards, health hazards, and handling problems at atmospheric pressure. Recognizing this potential hazard, the U.S. Department of Energy, owner and operator of the SPR, implemented a crude oil vapor pressure monitoring program that collects vapor pressure data for all the storage caverns. From these data, DOE evaluates the rate of change in vapor pressures of its oils in the SPR. Moreover, DOE implemented a vapor pressure mitigation program in which the oils are degassed periodically and will be cooled immediately prior to delivery in order to reduce the vapor pressure to safe handling levels. The work described in this report evaluates the entire database since its origin in 1993, and determines the current levels of vapor pressure around the SPR, as well as the rate of change for purposes of optimizing both the mitigation program and meeting safe delivery standards. Generally, the rate of vapor pressure increase appears to be lower in this analysis than reported in the past and, problematic gas intrusion seems to be limited to just a few caverns. This being said, much of the current SPR inventory exceeds vapor pressure delivery guidelines and must be degassed and cooled in order to meet current delivery standards.

  11. Field testing results for the strategic petroleum reserve pipeline corrosion control program

    SciTech Connect (OSTI)

    Buchheit, R.G.; Maestas, L.M.; Hinkebein, T.E.

    1998-02-01T23:59:59.000Z

    Results of two studies conducted as part of the Strategic Petroleum Reserve (SPR) Pipeline Corrosion Control Program are reported. These studies focused on evaluation of rotary-applied concrete materials for internal pipeline protection against the erosive and corrosive effects of flowing brine. The study also included evaluation of liners applied by hand on pipe pieces that cannot be lined by rotary methods. Such pipe pieces include tees, elbows and flanged pipe sections. Results are reported from a corrosion survey of 17 different liner formulations tested at the-Big-Rill SPR Site. Testing consisted of electrochemical corrosion rate measurements made on lined pipe sections exposed, in a test manifold, to flowing SPR generated fluids. Testing also involved cumulative immersion exposure where samples were exposed to static site-generated brine for increasing periods of time. Samples were returned to the laboratory for various diagnostic analyses. Results of this study showed that standard calcium silicate concrete (API RP10E) and a rotary calcium aluminate concrete formulation were excellent performers. Hand-lined pipe pieces did not provide as much corrosion protection. The focus of the second part of the study was on further evaluation of the calcium silicate, calcium aluminate and hand-applied liners in actual SPR equipment and service. It was a further objective to assess the practicality of electrochemical impedance spectroscopy (EIS) for field corrosion monitoring of concrete lined pipe compared to the more well-known linear polarization technique. This study showed that concrete linings reduced the corrosion rate for bare steel from 10 to 15 mils per year to 1 mil per year or less. Again, the hand-applied liners did not provide as much corrosion protection as the rotary-applied liners. The EIS technique was found to be robust for field corrosion measurements. Mechanistic and kinetic corrosion rate data were reliably obtained.

  12. Environmental assessment of the interim lease of a warehouse for the Strategic Petroleum Reserve in Jefferson Parish, Louisiana

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    The US Department of Energy (DOE) strategic Petroleum Reserve (SPR) proposes to lease an existing commercial warehouse for the storage, maintenance, and periodic readiness testing of 15 trailer-mounted 2000-horsepower diesel engine-driven pumps. These pumps are spares for the seven SPR sites. The warehouse to be selected will be in or near Harahan, Jefferson Parish, Louisiana near the SPR Project Management Office and the offices of the SPR Management and Operating contractor. Environmental impacts of the storing and testing of the pumps are outlined.

  13. Natural Reserve System UNIVERSITY OF CALIFORNIA

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Scripps Coastal Reserve Santa Barbara 29 Carpinteria Salt Marsh Reserve 30 Coal Oil Point Natural Reserve

  14. An evaluation of risk simulation models for reserve estimates

    E-Print Network [OSTI]

    Judah, Janeen Sue

    1983-01-01T23:59:59.000Z

    in estimating reserves for petroleum economic evaluations is an 1mportant everyday problem encountered by practicing petroleum engineers. This study addresses the problem of est1mating reserves for petroleum evaluations with little available data. The risk... to reserve est1mates. Latin Hypercube sampling is a relatively recent statistical development and has never before been applied to petroleum economic evaluations or petroleum risk simulators. The results show that simple random sampling is adequate...

  15. Joint environmental assessment for western NPR-1 3-dimensional seismic project at Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The Department of Energy (DOE), in conjunction with the Bureau of Land Management (BLM), has prepared an Environmental Assessment (DOE/EA-1124) to identify and evaluate the potential environmental impacts of the proposed geophysical seismic survey on and adjacent to the Naval Petroleum Reserve No.1 (NPR-1), located approximately 35 miles west of Bakersfield, California. NPR-1 is jointly owned and operated by the federal government and Chevron U.S.A. Production Company. The federal government owns about 78 percent of NPR-1, while Chevron owns the remaining 22 percent. The government`s interest is under the jurisdiction of DOE, which has contracted with Bechtel Petroleum Operations, Inc. (BPOI) for the operation and management of the reserve. The 3-dimensional seismic survey would take place on NPR-1 lands and on public and private lands adjacent to NPR-1. This project would involve lands owned by BLM, California Department of Fish and Game (CDFG), California Energy Commission (CEC), The Nature Conservancy, the Center for Natural Lands Management, oil companies (Chevron, Texaco, and Mobil), and several private individuals. The proposed action is designed to provide seismic data for the analysis of the subsurface geology extant in western NPR-1 with the goal of better defining the commercial limits of a currently producing reservoir (Northwest Stevens) and three prospective hydrocarbon bearing zones: the {open_quotes}A Fan{close_quotes} in Section 7R, the 19R Structure in Section 19R, and the 13Z Structure in Section 13Z. Interpreting the data is expected to provide NPR-1 owners with more accurate locations of structural highs, faults, and pinchouts to maximize the recovery of the available hydrocarbon resources in western NPR-1. Completion of this project is expected to increase NPR-1 recoverable reserves, and reduce the risks and costs associated with further exploration and development in the area.

  16. Audit of joint owner costing and billing practices, Naval Petroleum Reserve No. 1, Elk Hills, California

    SciTech Connect (OSTI)

    Richards, J.R.

    1986-01-13T23:59:59.000Z

    The review showed a need for the Department to revise and strengthen cash management and cost allocation procedures and practices for jointly shared Reserve operating costs funded by the Government. The procedures and practices in effect for processing Joint Owner costs, billings and collections do not permit the Government to receive full advantage of the time value of money paid in behalf of Chevron or provide for the full sharing of all costs incurred by the Government to absorb unnecessary interest and operating costs since assuming responsibility for funding Reserve operations in October 1975. It is estimated that the Department would benefit by over $3 million per year if our recommendations in these areas are fully implemented.

  17. Copyright 2001 All Rights Reserved Copyright 2001 All Rights Reserved

    E-Print Network [OSTI]

    Amaral, Luis A.N.

    Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001

  18. Copyright 2001. All Rights Reserved. Copyright 2001. All Rights Reserved.

    E-Print Network [OSTI]

    Kuhl, Michael E.

    Copyright 2001. All Rights Reserved. #12;Copyright 2001. All Rights Reserved. #12;Copyright 2001. All Rights Reserved. #12;Copyright 2001. All Rights Reserved. #12;Copyright 2001. All Rights Reserved. #12;Copyright 2001. All Rights Reserved. #12;Copyright 2001. All Rights Reserved. #12;Copyright

  19. Copyright 2001. All Rights Reserved. Copyright 2001. All Rights Reserved.

    E-Print Network [OSTI]

    Schultz, Ted

    Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright

  20. Copyright 2000 All Rights Reserved Copyright 2000 All Rights Reserved

    E-Print Network [OSTI]

    Kari, Lila

    Copyright 2000 All Rights Reserved #12;Copyright 2000 All Rights Reserved #12;Copyright 2000 All Rights Reserved #12;Copyright 2000 All Rights Reserved #12;Copyright 2000 All Rights Reserved #12;Copyright 2000 All Rights Reserved #12;Copyright 2000 All Rights Reserved #12;Copyright 2000

  1. Copyright 1997. All rights reserved. Copyright 1997. All rights reserved.

    E-Print Network [OSTI]

    Bataillon, Thomas

    Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12

  2. Petroleum production at maximum efficient rate, Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California. Draft Supplement to the 1979 Final Environmental Impact Statement

    SciTech Connect (OSTI)

    Not Available

    1992-05-01T23:59:59.000Z

    The proposed action involves the continued operation of the Naval Petroleum Reserve No. 1 (NPR-1) at the Maximum Efficiency Rate (MER) through the year approximately 2025 in accordance with the requirements of the Naval Petroleum Reserves Production Act of 1976 (P.L. 94-258). NPR-1 is a large oil and gas field comprising 74 square miles. MER production primarily includes continued operation and maintenance of existing facilities; a well drilling and abandonment program; construction and operation of future gas processing, gas compression, and steamflood, waterflood, cogeneration, and butane isomerization facilities; and continued implementation of a comprehensive environmental protection program. The basis for the draft environment impact statement (DSEIS) proposed action is the April 1989 NPR-1 Long Range Plan which describes a myriad of planned operational, maintenance, and development activities over the next 25--30 years. These activities include the continued operation of existing facilities; additional well drilling; expanded steamflood operations; expanded waterflood programs; expanded gas compression, gas lift, gas processing and gas injection; construction of a new cogeneration facility; construction of a new isobutane facility; and a comprehensive environmental program designed to minimize environmental impacts.

  3. Petroleum production at Maximum Efficient Rate Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California. Final Supplemental Environmental Impact Statement

    SciTech Connect (OSTI)

    Not Available

    1993-07-01T23:59:59.000Z

    This document provides an analysis of the potential impacts associated with the proposed action, which is continued operation of Naval Petroleum Reserve No. I (NPR-1) at the Maximum Efficient Rate (MER) as authorized by Public law 94-258, the Naval Petroleum Reserves Production Act of 1976 (Act). The document also provides a similar analysis of alternatives to the proposed action, which also involve continued operations, but under lower development scenarios and lower rates of production. NPR-1 is a large oil and gas field jointly owned and operated by the federal government and Chevron U.SA Inc. (CUSA) pursuant to a Unit Plan Contract that became effective in 1944; the government`s interest is approximately 78% and CUSA`s interest is approximately 22%. The government`s interest is under the jurisdiction of the United States Department of Energy (DOE). The facility is approximately 17,409 acres (74 square miles), and it is located in Kern County, California, about 25 miles southwest of Bakersfield and 100 miles north of Los Angeles in the south central portion of the state. The environmental analysis presented herein is a supplement to the NPR-1 Final Environmental Impact Statement of that was issued by DOE in 1979 (1979 EIS). As such, this document is a Supplemental Environmental Impact Statement (SEIS).

  4. US Department of Energy Naval Petroleum and Oil Shale Reserves combined financial statements and management overview and supplemental financial and management information, September 30, 1995 and 1994

    SciTech Connect (OSTI)

    NONE

    1996-02-15T23:59:59.000Z

    This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s (Department) Naval Petroleum and Oil Shale Reserves (NPOSR) financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on the NPOSR internal control structure and compliance with laws and regulations are also provided.

  5. Demand Response Spinning Reserve Demonstration

    E-Print Network [OSTI]

    2007-01-01T23:59:59.000Z

    F) Enhanced ACP Date RAA ACP Demand Response SpinningReserve Demonstration Demand Response Spinning Reservesupply spinning reserve. Demand Response Spinning Reserve

  6. Environmental Assessment on the leasing of the Strategic Petroleum Reserve, St. James Terminal, St. James Parish, Louisiana

    SciTech Connect (OSTI)

    NONE

    1995-01-01T23:59:59.000Z

    The US Department of Energy (DOE) proposes to lease the Strategic Petroleum Reserve`s (SPR) St. James Terminal to private industry. The St. James Terminal consists of six storage tanks, a pumping station, two maine docks and ancillary facilities. DOE believes that the St. James Terminal presents an opportunity to establish a government- industry arrangement that could more effectively use this asset to serve the nations`s oil distribution needs, reduce the operational cost of the SPR, and provide a source of revenue for the Government. DOE solicited interest in leasing its distribution facilities in a notice published March 16, 1994. In response, industry has expressed interest in leasing the St. James Terminal, as well as several DOE pipelines, to enhance the operation of its own facilities or to avoid having to construct new ones. Under such a lease, industry use would be subordinate to DOE use in the event of a national energy emergency. This Environmental Assessment describes the proposed leasing operation, its alternatives, and potential environmental impacts. Based on this analyses, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) OF 1969 and has issued the Finding of No Significant Impact (FONSI).

  7. Summary of events and geotechnical factors leading to decommissioning of the Strategic Petroleum Reserve (SPR) facility at Weeks Island, Louisiana

    SciTech Connect (OSTI)

    Neal, J.T. [ed.; Bauer, S.J.; Ehgartner, B.L. [and others

    1996-10-01T23:59:59.000Z

    A sinkhole discovered over the edge of the Strategic Petroleum Reserve storage facility at Weeks Island salt dome, Louisiana, led to decommissioning the site during 1995--1998, following extensive diagnostics in 1994. The sinkhole resulted from mine-induced fractures in the salt which took may years to develop, eventually causing fresh water to leak into the storage chamber and dissolve the overlying salt, thus causing overburden collapse into the void. Prior to initiating the oil removal, a freeze wall was constructed at depth around the sinkhole in 1995 to prevent water inflow; a freeze plug will remain in place until the mine is backfilled with brine in 1997--8, and stability is reached. Residual oil will be removed; environmental monitoring has been initiated and will continue until the facility is completely plugged and abandoned, and environmental surety is achieved.

  8. Audit of controls over crude oil production under Public Law 94-258 Naval Petroleum Reserve No. 1, Elk Hills, California. [Compliance with legislation

    SciTech Connect (OSTI)

    Not Available

    1986-04-25T23:59:59.000Z

    The Naval Petroleum Reserves Production Act of 1976 (Public Law 94-258) requires the Secretary to produce oil and gas from the Reserve at the Maximum Efficient Rate (MER) developed consistent with sound engineering practices. MER is defined as ''the maximum sustainable daily oil or gas rate from a reservoir which will permit economic development and depletion of that reservoir without detriment to the ultimate recovery.'' MER is determined through analyses and calculations using defined factors and parameters acquired through standard oil field testing procedures. Economic development and depletion of a reservoir without detriment to ultimate recovery means that production rates should not cause loss of originally obtainable petroleum and that revenues should exceed the cost of production. The purpose of the audit was to determine if the Department had adhered to the MER limitation on production at the Reserve as required by Public Law 94-258. Our review disclosed that production rates at the Reserve were not developed through engineering-based MER calculations. Production for the past seven years has exceeded the MER calculated by the Reserve's own engineers and principal consultants. According to studies prepared by the Department's technical engineers and consultants, between 90 and 130 million barrels of otherwise recoverable oil is at risk of being lost through overproduction over the life of the Reserve. Based on the average market value of $18 per barrel on March 6, 1986, the value of this oil was between $1.60 billion and $2.30 billion. We estimate that about half of the oil at risk of loss could yet be recovered if Reserve management develops and implements valid engineering-based MERs. 11 refs.

  9. S. 2375: a bill to disapprove of certain deferrals of Strategic Petroleum Reserve budget authority, to authorize additional appropriations with respect to the Strategic Petroleum Reserve, and to increase oil import fees. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, April 28, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    The purpose of this bill is to disapprove of certain deferrals of the Strategic Petroleum Reserve (SPR) budget authority, to authorize additional appropriations to the SPR, and to increase oil import fees. The bill authorizes $1 billion for fiscal years 1987, 88, and 89 for crude oil acquisitions for the SPR and $163 million for storage and related facility construction during 1987. It also instructs the Energy Secretary to cease production from the Naval Petroleum Reserve at Elk Hills for six months to allow the reservoir depletion to stabilize.

  10. Strategic Petrolem Reserve: Annual/quarterly report

    SciTech Connect (OSTI)

    Not Available

    1987-02-01T23:59:59.000Z

    In August 1986 the President reaffirmed the Administration's strong support for development of a 750 million-barrel Strategic Petroleum Reserve and committed the Administration to filling the Reserve throughout fiscal year 1987. During 1986, a number of bills related to the Strategic Petroleum Reserve were enacted. As of December 31, 1986, the Strategic Petroleum Reserve crude oil inventory was 511.6 million barrels of crude oil, an increase of 18.3 million barrels over the 1985 year end inventory of 493.3 million barrels. The Strategic Petroleum Reserve was filled at an average fill rate of 51,430 barrels per day during 1986. During the calendar year 1986, the Strategic Petroleum Reserve increased its crude oil storage capability from 509.4 million barrels to 550.7 million barrels, adding approximately 27.4 million barrels of new storage capacity at the Bryan Mound storage site and 13.9 million barrels at the West Hackberry storage site. As required by the Energy Policy and Conservation Amendments Act of 1985, enacted July 2, 1985, the Department of Energy conducted a test sale of Strategic Petroleum Reserve crude oil between November 18, 1985 and January 31, 1986, to test the Strategic Petroleum Reserve's drawdown and distribution capabilities. In addition to the test sale, three subsequent tests of the Strategic Petroleum Reserve's physical drawdown capabilities were conducted. Substantial progress was made in distribution enhancement program during 1986, with the construction of a 46-mile oil distribution pipeline from Bryan Mound to the ARCO common carrier pipeline system at Texas City, TX. 9 figs., 9 tabs.

  11. Reservoir analysis study, Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 2 report: Volume 1, Appendices

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    The objectives for the Phase II study included the establishment of revised estimates of the original oil and gas-in-place for each of the zones/reservoirs, estimation of the remaining proved developed, proved undeveloped, probable and possible reserves, and assessment of the effects of historical development and production operations and practices on recoverable reserves. 43 figs., 103 tabs.

  12. EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to install an overhead powerline extension from the U.S. Department of Energy's Naval Petroleum Reserve No. 1 (NPR-1) power source to the...

  13. Allocating Reserve Requirements (Presentation)

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; King, J.

    2011-07-01T23:59:59.000Z

    This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

  14. Naval Petroleum and Oil Shale Reserve. Hearing before the Subcommittee on Preparedness of the Committee on Armed Services, United States Senate, Ninety-Eighth Congress, First Session on S. 1810, September 29, 1983

    SciTech Connect (OSTI)

    Not Available

    1984-01-01T23:59:59.000Z

    Captain Myron E. Smith, Jr., Director of the DOE Office of Naval Petroleum and Oil Shale Reserves, testified at a hearing on S. 1810, which authorizes funds relating to the petroleum and oil shale reserves. Smith reviewed revenues and expenditures since legislation was passed in 1976, noting that production at Elk Hills and Teapot Dome are at peak levels, in his justification of the budget request of $266.1 million. Questions from the committee and Smith's responses follow his formal testimony.

  15. Review of mineral estate of the United States at Naval Petroleum Reserve No. 2, Buena Vista Hills Field, Kern County, California

    SciTech Connect (OSTI)

    NONE

    1996-08-09T23:59:59.000Z

    The purpose of this report is to present this Consultant`s findings regarding the nature and extent of the mineral estate of the United States at National Petroleum Reserve No. 2 (NPR-2), Buena Vista Hills Field, Kern County, California. Determination of the mineral estate is a necessary prerequisite to this Consultant`s calculation of estimated future cash flows attributable to said estate, which calculations are presented in the accompanying report entitled ``Phase II Final Report, Study of Alternatives for Future Operations of the Naval Petroleum and Oil Shale Reserves, NPR-2, California.`` This Report contains a discussion of the leases in effect at NPR-2 and subsequent contracts affecting such leases. This Report also summarizes discrepancies found between the current royalty calculation procedures utilized at NPR-2 and those procedures required under applicable agreements and regulations. Recommendations for maximizing the government`s income stream at NPR-2 are discussed in the concluding section of this Report.

  16. Geologic technical assessment of the Richton salt dome, Mississippi, for potential expansion of the U.S. strategic petroleum reserve.

    SciTech Connect (OSTI)

    Snider, Anna C.; Rautman, Christopher Arthur; Looff, Karl M. (Geologic Consultant)

    2006-01-01T23:59:59.000Z

    Technical assessment and remodeling of existing data indicates that the Richton salt dome, located in southeastern Mississippi, appears to be a suitable site for expansion of the U.S. Strategic Petroleum Reserve. The maximum area of salt is approximately 7 square miles, at a subsurface elevation of about -2000 ft, near the top of the salt stock. Approximately 5.8 square miles of this appears suitable for cavern development, because of restrictions imposed by modeled shallow salt overhang along several sides of the dome. The detailed geometry of the overhang currently is only poorly understood. However, the large areal extent of the Richton salt mass suggests that significant design flexibility exists for a 160-million-barrel storage facility consisting of 16 ten-million-barrel caverns. The dome itself is prominently elongated from northwest to southeast. The salt stock appears to consist of two major spine features, separated by a likely boundary shear zone trending from southwest to northeast. The dome decreases in areal extent with depth, because of salt flanks that appear to dip inward at 70-80 degrees. Caprock is present at depths as shallow as 274 ft, and the shallowest salt is documented at -425 ft. A large number of existing two-dimensional seismic profiles have been acquired crossing, and in the vicinity of, the Richton salt dome. At least selected seismic profiles should be acquired, examined, potentially reprocessed, and interpreted in an effort to understand the limitations imposed by the apparent salt overhang, should the Richton site be selected for actual expansion of the Reserve.

  17. Five-year resurvey for endangered species on Naval Petroleum Reserve No. 1, (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Otten, M.R.M.; O`Farrell, T.P.; Briden, L.E.

    1992-06-01T23:59:59.000Z

    A transect survey of Naval Petroleum Reserve No. 1 (NPR-1), Kern County, California, was conducted between July 3 and August 5, 1989 to determine the distribution and relative density of endangered species and other wildlife. Results were compared with other reported results, particularly the 1979 and 1984 surveys of NPR-1. A total of 589.8 miles of transects were walked through approximately 47,235 acres in all or parts of 81 sections. Of the 516 San Joaquin kit fox dens observed, 496 were typical subterranean dens and 20 were atypical dens in man-made structures. Estimated den density was 36.7 {plus_minus} 4.1 per square mile; and relative den density was 10.5/1,000 acres for all of NPR-1. Characteristics of typical kit fox dens were comparable to characteristics reported for other studies, except mean number of entrances per den, which was lower. Observers counted a total of 300 dens previously marked with an identification sign, 191 of which contained at least one complete entrance and would have been observed without a sign. Relative densities of preferred kit fox prey, black-toiled jackrabbits (40.1/1,000 acres) and desert cottontails (14.1/1,000 acres), were lower than previously recorded. Five blunt-nosed leopard lizards were observed along the southwest and northeast perimeter of the Reserve. Most of the 59 giant kangaroo rat burrow systems were observed in the flat terrain along the northeast and south perimeters of the Reserve. San Joaquin antelope squirrels were observed in the central and western parts of NPR- 1. A total of 73 antelope squirrels were observed, and the relative density was 1.511,000 acres. A total.of 30 possible environmental hazards were observed during transect surveys. Most of these were oil and water leaks of small size and appeared to pose little risk to endangered species. Results of this survey indicate that NPR-1 is supporting less wildlife than it did during either the 1979 or 1984 surveys.

  18. Five-year resurvey for endangered species on Naval Petroleum Reserve No. 1, (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Otten, M.R.M.; O'Farrell, T.P.; Briden, L.E.

    1992-06-01T23:59:59.000Z

    A transect survey of Naval Petroleum Reserve No. 1 (NPR-1), Kern County, California, was conducted between July 3 and August 5, 1989 to determine the distribution and relative density of endangered species and other wildlife. Results were compared with other reported results, particularly the 1979 and 1984 surveys of NPR-1. A total of 589.8 miles of transects were walked through approximately 47,235 acres in all or parts of 81 sections. Of the 516 San Joaquin kit fox dens observed, 496 were typical subterranean dens and 20 were atypical dens in man-made structures. Estimated den density was 36.7 [plus minus] 4.1 per square mile; and relative den density was 10.5/1,000 acres for all of NPR-1. Characteristics of typical kit fox dens were comparable to characteristics reported for other studies, except mean number of entrances per den, which was lower. Observers counted a total of 300 dens previously marked with an identification sign, 191 of which contained at least one complete entrance and would have been observed without a sign. Relative densities of preferred kit fox prey, black-toiled jackrabbits (40.1/1,000 acres) and desert cottontails (14.1/1,000 acres), were lower than previously recorded. Five blunt-nosed leopard lizards were observed along the southwest and northeast perimeter of the Reserve. Most of the 59 giant kangaroo rat burrow systems were observed in the flat terrain along the northeast and south perimeters of the Reserve. San Joaquin antelope squirrels were observed in the central and western parts of NPR- 1. A total of 73 antelope squirrels were observed, and the relative density was 1.511,000 acres. A total.of 30 possible environmental hazards were observed during transect surveys. Most of these were oil and water leaks of small size and appeared to pose little risk to endangered species. Results of this survey indicate that NPR-1 is supporting less wildlife than it did during either the 1979 or 1984 surveys.

  19. Copyright 2001 All Rights ReservedCopyright 2001 All Rights ReservedCopyright 2001 All Rights Reserved Copyright 2001 All Rights ReservedCopyright 2001 All Rights ReservedCopyright 2001 All Rights Reserved

    E-Print Network [OSTI]

    Troyer, Todd W.

    Copyright © 2001 All Rights ReservedCopyright © 2001 All Rights ReservedCopyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights ReservedCopyright © 2001 All Rights ReservedCopyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights ReservedCopyright © 2001 All Rights Reserved

  20. Reproduction of the San Joaquin kit fox on Naval Petroleum Reserve No. 1, Elk Hills, California: 1980-1985

    SciTech Connect (OSTI)

    Zoellick, B.W.; O'Farrell, T.P.; McCue, P.M.; Harris, C.E.; Kato, T.T.

    1987-01-01T23:59:59.000Z

    Reproduction of the San Joaquin kit fox (Vulpes macrotis mutica) was studied in areas of petroleum development and areas relatively undisturbed by development on and adjacent to Elk Hills Naval Petroleum Reserve No. 1 (NPR-1), California from 1980-1985. Pregnancy rates of adults did not differ between habitats (93 to 100%), but the yearling pregnancy rate in developed habitat (56%) was lower than the adult rates and the yearling rate for undeveloped habitat (100%). Mean corpora lutea and placental scar counts did not differ between undeveloped and developed habitats, but adults had greater corpora lutea and placental scar counts than yearlings. Litter sizes averaged 4.1 and 4.4 for undeveloped and developed habitats respectively from 1980-1985 and did not differ between years or habitats. Mean number of litters observed per square mile during 1980-1985 did not differ between undeveloped (0.34) and developed habitats (0.29). The percentage of all females successfully raising pups in developed habitat declined significantly from 1980-1985 in comparison with the percent success of females in undeveloped habitat. Numbers of litters per square mile in developed habitat also declined significantly after 1981. The sex ratio of pups trapped in developed habitat was skewed towards males during the decline in litters produced per square mile from 1982-1985, but the ratio of males to females in undeveloped habitat did not differ from 1:1 during this time. The decline in some measures of reproductive success in developed habitat after 1981 coincided with a decrease in black-tailed jackrabbit and desert cottontail numbers on the NPR-1 study area. The decreased reproductive success of foxes in developed habitat after 1981 may have resulted from habitat degradation caused by oil field production activities, declining lagomorph numbers, or other unknown causes. 49 refs., 7 figs., 8 tabs.

  1. Geologic technical assessment of the Chacahoula Salt Dome, Louisiana, for potential expansion of the U.S. strategic petroleum reserve.

    SciTech Connect (OSTI)

    Snider, Anna C.; Rautman, Christopher Arthur; Looff, Karl M. (Geologic Consultant, Lovelady, TX)

    2006-03-01T23:59:59.000Z

    The Chacahoula salt dome, located in southern Louisiana, approximately 66 miles southwest of New Orleans, appears to be a suitable site for a 160-million-barrel-capacity expansion facility for the U.S. Strategic Petroleum Reserve, comprising sixteen 10-million barrel underground storage caverns. The overall salt dome appears to cover an area of some 1800 acres, or approximately 2.8 square miles, at a subsea elevation of 2000 ft, which is near the top of the salt stock. The shallowest known salt is present at 1116 ft, subsea. The crest of the salt dome is relatively flatlying, outward to an elevation of -4000 ft. Below this elevation, the flanks of the dome plunge steeply in all directions. The dome appears to comprise two separate spine complexes of quasi-independently moving salt. Two mapped areas of salt overhang, located on the eastern and southeastern flanks of the salt stock, are present below -8000 ft. These regions of overhang should present no particular design issues, as the conceptual design SPR caverns are located in the western portion of the dome. The proposed cavern field may be affected by a boundary shear zone, located between the two salt spines. However, the large size of the Chacahoula salt dome suggests that there is significant design flexibility to deal with such local geologic issues.

  2. Summary and evaluation of the coyote control program on Naval Petroleum Reserve No. 1, Kern County, California, 1987

    SciTech Connect (OSTI)

    Scrivner, J.H.

    1987-09-01T23:59:59.000Z

    For the third consecutive year (1987) the US Department of Energy (DOE) funded a coyote (Canis latrans) control program in an attempt to reduce coyote predation on the endangered San Joaquin kit fox (Vulpes macrotis mutica) on Naval Petroleum Reserve No. 1 (NPR-1, Elk Hills) in Kern County, California. During approximately 8 weeks of control activities, personnel from the US Department of Agriculture, Division of Animal Damage Control (ADC), removed 16 adult coyotes: 14 were trapped, 2 were shot. Data were gathered on standard measurements, weights, ages, and reproductive condition. No kit foxes were accidently trapped. Based on the results of canid scent-station surveys, the coyote population on NPR-1 declined and the kit fox population was relatively stable. Recommendations were made to conduct the 1987/1988 coyote control program between December 1987 and February 1988, use helicopters for aerial gunning and locating coyote dens, and develop a cooperative agreement between DOE, ADC, US Fish and Wildlife Service, Bureau of Land Management, and the California Department of Fish and Game to conduct the coyote control program on lands surrounding NPR-1 owned by DOE and others. 8 refs., 2 figs., 2 tabs.

  3. U.S. Department of Energy Naval Petroleum Reserve Number 1 quarterly financial statements, December 31, 1996 and 1995

    SciTech Connect (OSTI)

    NONE

    1997-03-18T23:59:59.000Z

    The report presents the results of the independent certified public accountants` review of the Department of Energy`s Naval Petroleum Reserve Number 1 interim financial statements as of December 31, 1996 and 1995. The review was done in accordance with Statements on Standards for Accounting and Review Services issued by the American Institute of Certified Public Accountants. A review of interim financial statements consists principally of inquiries of NPR-1 personnel and analytical procedures applied to financial data. It is substantially less in scope than an audit in accordance with generally accepted auditing standards, the objective of which is the expression of an opinion regarding the financial statements take as a whole. Accordingly, the certified public accountants do not express such an opinion. The auditors have stated that, except for the omission of certain disclosures, they are not aware of any material modifications that should be made to the financial statements in order for them to be in conformity with the other comprehensive basis of accounting described in Note 1 to the financial statements.

  4. U.S. Department of Energy Naval Petroleum Reserve Number 1 quarterly financial statements, March 31, 1997 and 1996

    SciTech Connect (OSTI)

    NONE

    1997-04-17T23:59:59.000Z

    The report presents the results of the independent certified public accountants` review of the Department of Energy`s Naval Petroleum Reserve Number 1 interim financial statements as of March 31, 1997 and 1996. The review was done in accordance with Statements on Standards for Accounting and Review Services issued by the American Institute of Certified Public Accountants. A review of interim financial statements consist principally of inquires of NPR-1 personnel and analytical procedures applied to financial data. It is substantially less in scope than an audit in accordance with generally accepted auditing standards, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, the certified public accountants do not express such an opinion. The auditors have stated that, except for the omission of certain disclosures, they are not aware of any material modifications that should be made to the financial statements in order for them to be in conformity with the other comprehensive basis of accounting described in Note 1 to the financial statements.

  5. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  6. Origin, diagnostics, and mitigation of a salt dissolution sinkhole at the US Strategic Petroleum Reserve storage site, Weeks Island, Louisiana

    SciTech Connect (OSTI)

    Neal, J.T. [Sandia National Labs., Albuquerque, NM (United States); Myers, R.E. [USDOE, New Orleans, LA (United States)

    1995-01-27T23:59:59.000Z

    A sinkhole was first observed in May 1992 over the edge of the two-level former salt mine that was converted for oil storage by the US Strategic Petroleum Reserve (SPR). Diagnostic studies that included geophysical, geochemical, drilling, and hydrological methods suggest a direct connection exists between the surface collapse area and the underground mine as shown by correlative measurements of sediment slump rates and brine influx into the mine. The dissolution of salt below the sinkhole that initiated the leak into the mine was likely caused by several confluent geologic processes, and exacerbated by mining-induced stresses that created fractures which served as hydrologic flowpaths. Modeling studies of mine stresses show that years may be required before tensional cracking begins to occur, but once begun can continue to develop, and relieve the stress in that specific regime. The crack regime creates the avenue for incursion of groundwater, very slowly initially, but gradually enlarging as undersaturated groundwater dissolves salt on the sides of the crack. Mitigation measures include increasing the mine pressurization, slowing the dissolution by injecting brine into the sinkhole throat, and freeze grouting to restrict hydrologic flowpaths.

  7. Geotechnical studies associated with decommissioning the strategic petroleum reserve facility at Weeks Island, Louisiana: A case history

    SciTech Connect (OSTI)

    Bauer, S.J.; Ehgartner, B.L.; Neal, J.T. [Sandia National Labs., Albuquerque, NM (United States). Underground Storage Technology

    1997-05-01T23:59:59.000Z

    The first sinkhole at the Weeks Island Strategic Petroleum Reserve (SPR) site was initially observed in May 1992. Concurrent with the increasing dissolution of salt over the mined oil storage area below, it has gradually enlarged and deepened. Beginning in 1994 and continuing to the present, the injection of saturated brine directly into the sinkhole throat some 76 m beneath the ground surface essentially arrested further dissolution, providing time to make adequate preparation for the safe and orderly transfer of crude oil to other storage facilities. This mitigation measure marked the first time that such a control procedure has been used in salt mining; previously all control has been achieved by either in-mine or from-surface grouting. A second and much smaller sinkhole was noticed in early 1995 on an opposite edge of the SPR mine, but with a very similar geological and mine mechanics setting. Both sinkholes occur where the edges of upper 152 m and lower 213 m mined storage levels are nearly vertically aligned. Such coincidence maximizes the tensional stress development, leading to fracturing in the salt. This cracking takes 20 or more years to develop. The cracks then become flow paths for brine incursion, which after time progress into the mined openings. Undersaturated ground water gradually enlarges the cracks in salt through dissolution, leading to eventual collapse of the overlying sand to form sinkholes. Other geologic conditions may also be secondary factors in controlling both mining extent and sinkhole location.

  8. Strategic Petroleum Reserve, West Hackberry oil storage cavern fire and spill of September 21, 1978: an environmental assessment. Final report

    SciTech Connect (OSTI)

    Taylor, A

    1980-02-29T23:59:59.000Z

    This report summarizes an environmental assessment of the fire and oil spill at the Strategic Petroleum Reserve site, West Hackberry, Louisiana. Subjective identification of oil contaminated habitats was supported by a more rigorous classification of samples utilizing discriminant analysis. Fourteen contaminated stations were identified along the shore of Black Lake just north and west of Wellpad 6, encompassing approximately 9 hectares. Seasonal variation in the structures of marsh and lake bottom communities in this contaminated area were not generally distinguishable from that of similar communities in uncontaminated habitats along the southern and southeastern shores of Black Lake. The major impact of spilled oil on the marsh vegetation was to accelerate the natural marsh deterioration which will eventually impact animals dependent on marsh vegetation for habitat structure. Vanadium, the predominate trace metal in the oil, and pyrogenic products due to the fire were found at the most distant sampling site (5 km) from Cavern 6 during Phase I, but were not detected downwind of the fire in excess of background levels in the later phases. Remote sensing evaluation of vegetation under the plume also indicated that stress existed immediately after the fire, but had disappeared by the end of the 1-year survey.

  9. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 3, Bryan Mound Site, Texas.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-09-01T23:59:59.000Z

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 3 focuses on the Bryan Mound SPR site, located in southeastern Texas. Volumes 1, 2, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Big Hill SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  10. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 4, West Hackberry site, Louisiana.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-09-01T23:59:59.000Z

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 4 focuses on the West Hackberry SPR site, located in southwestern Louisiana. Volumes 1, 2, and 3, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Big Hill SPR site, Texas, and the Bryan Mound SPR site, Texas. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  11. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 2, Big Hill Site, Texas.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-08-01T23:59:59.000Z

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 2 focuses on the Big Hill SPR site, located in southeastern Texas. Volumes 1, 3, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Bryan Mound SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  12. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 1, Bayou Choctaw site, Louisiana.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-10-01T23:59:59.000Z

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 1 focuses on the Bayou Choctaw SPR site, located in southern Louisiana. Volumes 2, 3, and 4, respectively, present images for the Big Hill SPR site, Texas, the Bryan Mound SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  13. Reservations to human rights treaties

    E-Print Network [OSTI]

    McCall-Smith, Kasey Lowe

    2012-06-26T23:59:59.000Z

    This thesis examines the default application of the 1969 Vienna Convention on the Law of Treaties reservation rules to reservations to human rights treaties. The contemporary practice of formulating reservations allows ...

  14. Naval Petroleum and Oil Shale Reserves Combined Financial Statements September 30, 1994 and 1993 and Management Overview and Supplemental Financial and Management Information

    SciTech Connect (OSTI)

    NONE

    1994-12-31T23:59:59.000Z

    This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s (Department) Naval Petroleum and Oil Shale Reserves (NPOSR) financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on the 1994 statements. Their reports on the NPOSR internal control structure and on compliance with laws and regulations, and management letter on addressing needed improvements are also provided. NPOSR consists of petroleum reserves in California and Wyoming, and oil shale reserves in Colorado and Utah. The Government`s interests in NPOSR are managed by the Department through its headquarters office in Washington, D.C. In addition, the Department has site offices in both California and Wyoming that are responsible for contractor oversight functions. Daily operations are conducted under contract by two management and operating contractors. By law, NPOSR was authorized to produce crude oil at the maximum efficient rate for six years. The law allowed production to be extended for three year periods, provided that the President of the United States certified that continued maximum production was in the best interest of the nation. The current three year period ends on April 5, 1997. Additional information about NPOSR is provided in the overview and notes to the financial statements.

  15. Reservoir analysis study, Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 2 report: Volume 2

    SciTech Connect (OSTI)

    Not Available

    1988-06-01T23:59:59.000Z

    The objectives for this Phase II study included the establishment of revised estimates of the original oil and gas-in-place for each of the zones/reservoirs, estimation of the remaining proved developed, proved undeveloped, probable and possible reserves, and assessment of the effects of historical development and production operations and practices on recoverable reserves. Volume two contains reservoir studies for: Stevens/endash/26R/2B; Stevens/endash/29R242/132/Asphalto; Stevens/endash/Northwest; and Carneros.

  16. Exploiting heavy oil reserves

    E-Print Network [OSTI]

    Levi, Ran

    North Sea investment potential Exploiting heavy oil reserves Beneath the waves in 3D Aberdeen the potential of heavy oil 8/9 Taking the legal lessons learned in the north Sea to a global audience 10 potential Exploiting heavy oil reserves Aberdeen: A community of science AT WORK FOR THE ENERGY SECTOR ISSUE

  17. Naval Petroleum Reserve No. 2: Buena Vista Oil and Gas Field, Kern County, California: Proved reserves, Developed and undeveloped, Sections 6 and 8: Development history and exploitation techniques, Effective July 1, 1987: (Final technical report)

    SciTech Connect (OSTI)

    Carey, K.B.

    1987-09-09T23:59:59.000Z

    The research for the initial Naval Petroleum Reserve No. 2 (NPR-2), study Task Assignment 010, showed the possibility of undeveloped proved reserves in the Shallow Pool on Government leases. Task Assignment 010C included a study to confirm or disprove the possibility. The six-section area, which is highlighted on Exhibit M-2, was chosen as the area for specific study of this subject. The Shallow Oil Zone, as depicted on Exhibit S-1, was the focal point of the study in the area. Competitive development of Government land with adjacent privately held land is an issue which has often been raised regarding NPR-2; however, it has never been formally addressed. Task Assignment 010C commissioned a study of the subject in the same six-section area designated for the study of proved undeveloped reserves. The producing formations in the Buena Vista Field of NPR-2 are very similar to the producing formations in the Elk Hills Field of NPR-1 to the north. It is possible that some of the successful development techniques utilized in NPR-2 by the various operators might enhance production efficiency at NPR-1. Task Assignment 010C included a detailed task of researching techniques used in NPR-2 for possible application in NPR-1. Because the detailed tasks of Task Assignment 010C are divergent in scope, a composite summary of the study's research is not included in this report. Each task's research is detailed in a separate Discussion section. Exhibits for these discussions are contained in an Exhibit section at the end of this volume. The appendices include: task assignment; DOE letters to lessees; Evans, Carey and Crozier letters to lessees; reports and studies from lessees; core analysis data; production data; geologic picks of formation tops; and annotated well logs. 22 figs., 6 tabs.

  18. Reservoir analysis study, Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 3 report, economic development and production plan

    SciTech Connect (OSTI)

    Not Available

    1988-07-01T23:59:59.000Z

    Jerry R. Bergeson and Associates, Inc. (Bergeson) has completed Phase 3 of the Reservoir Analysis, Naval Petroleum Reserve Number 1, Elk Hills Oilfield, California. The objective of this phase of the study was to establish the economic potential for the field by determining the optimum economic plan for development and production. The optimum economic plan used net cash flow analysis to evaluate future expected Department of Energy revenues less expenses and investments for proved developed, proved undeveloped, probable, possible and possible-enhanced oil recovery (EOR) reserves assigned in the Phase 2 study. The results of the Phase 2 study were used to define future production flowstreams. Additional production scheduling was carried out to evaluate accelerated depletion of proved developed reserves in the 29R, 31 C/D Shale and Northwest Stevens T Sand/N Shale Reservoirs. Production, cost and investment schedules were developed for the enhanced oil recovery projects identified in Phase 2. Price forecasts were provided by the Department of Energy. Operating costs and investment requirements were estimated by Bergeson. 4 figs., 48 tabs.

  19. Study of alternatives for future operations of the naval petroleum and oil shale reserves, NOSR-2, Uintah and Carbon Counties, Utah. Final report

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    The US Department of Energy (DOE) has asked Gustavson Associates, Inc. to serve as an Independent Petroleum Consultant and authorized a study and recommendations regarding future development of Naval Oil Shale Reserve No. 2 (NOSR-2) in Uintah and Carbon Counties, Utah. The US owns 100% of the mineral rights and about 60% of the surface rights in NOSR-2. The Ute Indian Tribe owns the other 40% of the surface. This 88,890-acre tract was set aside as an oil shale reserve for the US Navy by an Executive Order of President Wilson in 1916. Management of NOSR-2 is the responsibility of DOE. No drilling for oil and gas has occurred on the property and no production has been established. No reserves are present, although the area is hypothesized to overlay gas resources. Mapping by the US Geological Survey and others has resulted in speculative seismic leads for structures that may or may not hold conventional oil and gas. All of the mineral rights (including oil shale) must be considered exploratory and the mineral rights must be valued accordingly. The opinion recommended to maximize value to the US is Option 4, sale of the interest of the US of all or part of NOSR-2. Evaluation of this option results in an estimated value which is more than three times greater than the next highest estimated value, for Option 2, transfer to the Department of the Interior for leasing.

  20. FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments

    SciTech Connect (OSTI)

    Thomas R. Wood

    2010-01-01T23:59:59.000Z

    To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations energy needs. The mission of the WECI is to bolster Americas future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOEs WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an analog resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

  1. A critical review of methods used in the estimation of natural gas reserves: Natural gas reserves in the state of Texas. Some educational prerequisites in the field of petroleum economics and evaluation.

    E-Print Network [OSTI]

    Crichton, John Alston

    1953-01-01T23:59:59.000Z

    for oil. In order to make an a- urete determination of the recovery factor, it is necessary to pre-determine the pressure history of the field. by material balance and water influx calculations, or by extra- polatutg a curve cf pressure agatnst...-Associated Gas Reserves Volumetr ic Method Discussion of the Factors in tne Volumetri. Formula The Decline Curve Method 7 7 12 Ie Methods of Estimating Associated Gas Reserves Methods of Estimatmg Dissolved Gas Reserves Water Drive Constant Voluxne...

  2. Feasibility report on alternative methods for cooling cavern oils at the U.S. Strategic Petroleum Reserve.

    SciTech Connect (OSTI)

    Levin, Bruce L.; Lord, David L.; Hadgu, Teklu

    2005-06-01T23:59:59.000Z

    Oil caverns at the U.S. Strategic Petroleum Reserve (SPR) are subjected to geothermal heating from the surrounding domal salt. This process raises the temperature of the crude oil from around 75 F upon delivery to SPR to as high as 130 F after decades of storage. While this temperature regime is adequate for long-term storage, it poses challenges for offsite delivery, with warm oil evolving gases that pose handling and safety problems. SPR installed high-capacity oil coolers in the mid-1990's to mitigate the emissions problem by lowering the oil delivery temperature. These heat exchanger units use incoming raw water as the cooling fluid, and operate only during a drawdown event where incoming water displaces the outgoing oil. The design criteria for the heat exchangers are to deliver oil at 100 F or less under all drawdown conditions. Increasing crude oil vapor pressures due in part to methane intrusion in the caverns is threatening to produce sufficient emissions at or near 100 F to cause the cooled oil to violate delivery requirements. This impending problem has initiated discussion and analysis of alternative cooling methods to bring the oil temperature even lower than the original design basis of 100 F. For the study described in this report, two alternative cooling methods were explored: (1) cooling during a limited drawdown, and (2) cooling during a degas operation. Both methods employ the heat exchangers currently in place, and do not require extra equipment. An analysis was run using two heat transfer models, HEATEX, and CaveMan, both developed at Sandia National Laboratories. For cooling during a limited drawdown, the cooling water flowrate through the coolers was varied from 1:1 water:oil to about 3:1, with an increased cooling capacity of about 3-7 F for the test cavern Bryan Mound 108 depending upon seasonal temperature effects. For cooling in conjunction with a degas operation in the winter, cavern oil temperatures for the test cavern Big Hill 102 were cooled sufficiently that the cavern required about 9 years to return to the temperature prior to degas. Upon reviewing these results, the authors recommended to the U.S. Department of Energy that a broader study of the cooling during degas be pursued in order to examine the potential benefits of cooling on all caverns in the current degasification schedule.

  3. Characterization of the National Petroleum Reserve No. 3 (NPR-3) Site for Naturally Occurring Radioactive Material(NORM)

    SciTech Connect (OSTI)

    White, G.J; Rood, A.S.

    1999-01-21T23:59:59.000Z

    The National Petroleum Reserve No. 3 site (NPR-3) near Casper, Wyoming is being prepared for transfer to private industry. Remediation of the NPR-3 site has already begun in anticipation of this transfer. This document describes the characterization of the NPR-3 site for Naturally Occurring Radioactive Materials (NORM). Data generated on radionuclide concentrations and radon emanation may be used to determine disposal options and the need for remediation at this site. A preliminary gamma survey of the NPR-3 site was conducted to identify areas of potential NORM contamination. Based on these gamma surveys, two general areas of NORM contamination were found: the North Water Flood area and the BTP-10 produced water discharge steam. A maximum surface exposure rate of 120 {micro}R h{sup -1} was observed in the North Water Flood area, with the highest readings found along the drainage channel from the area. Exposure rates dropped to background quickly with increasing distance from the center of the drainage. The maximum observed exposure rate in the BTP-10 produced water drainage was 40 {micro}R h{sup -1}. Soil and sediment sampling were concentrated in these two areas. All samples were analyzed for concentration of {sup 226}Ra, {sup 228}Ra, and {sup 40}K. Maximum {sup 226}Ra concentrations observed in the samples collected were 46 pCi g{sup -1} for soil and 78 pCi g{sup -1} for sediment. Concentrations in most samples were considerably lower than these values. Radon emanation fraction was also measured for a randomly selected fraction of the samples. The mean Rn emanation fraction measured was 0.10, indicating that on average only 10 percent of the Rn produced is released from the medium. Based on the results of these analyses, NORM contamination at the NPR-3 site is minimal, and appears to be restricted to the two general areas sampled. Concentrations of NORM radionuclides found soils and sediments in these two locations do not justify remedial actions at present. However, continued discharge of NORM-contaminated produced waters from the BTP-10 area will likely result in the continued accumulation of NORM in sediment. It is therefore recommended that the sediments in the BTP-10 discharge stream be monitored periodically for NORM.

  4. Results of preconstruction surveys used as a management technique for conserving endangered species and their habitats on Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Kato, T.T.; O'Farrell, T.P.; Johnson, J.W.

    1985-08-01T23:59:59.000Z

    In 1976 an intensive program of petroleum production at maximum efficient rate was initiated on the US Department of Energy's (DOE) Naval Petroleum Reserve No. 1 (Elk Hills) in western Kern County, California. In a Biological Opinion required by the Endangered Species Act, the US Fish and Wildlife Service concluded that proposed construction and production activities may jeopardize the continued existence of the endangered San Joaquin kit fox, Vulpes macrotis mutica, and the blunt-nosed leopard lizard, Gambelia silus, inhabiting the Reserve. DOE committed itself to carrying out a compensation/mitigation plan to offset impacts of program activities on endangered species and their habitats. One compensation/mitigation strategy was to develop and implement preconstruction surveys to assess potential conflicts between proposed construction activities, and endangered species and their critical habitats, and to propose reasonable and prudent alternatives to avoid conflicts. Between 1980 and 1984, preconstruction surveys were completed for 296 of a total of 387 major construction projects encompassing 3590 acres. Fewer than 22% of the projects potentially conflicted with conservation of endangered species, and most conflicts were easily resolved by identifying sensitive areas that required protection. Only 8% of the projects received minor modification in their design or locations to satisfy conservation needs, and only three projects had to be completely relocated. No projects were cancelled or delayed because of conflicts with endangered species, and costs to conduct preconstruction surveys were minimal. 27 refs., 9 figs., 2 tabs.

  5. Application of Metagenomics for Identification of Novel Petroleum Hydrocarbon Degrading Enzymes in Natural Asphalts from the Rancho La Brea Tar Pits

    E-Print Network [OSTI]

    Baquiran, Jean-Paul Mendoza

    2010-01-01T23:59:59.000Z

    the petroleum in conventional oil reserves and interest inpetroleum in conventional oil reserves (Head et al. , 2003).in conventional oil reserves and the use of petroleum-

  6. FE Petroleum Reserves News

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexasManager FAQS Reference Guide -September 30,Clean CoalFEOil

  7. Strategic Petroleum Reserve

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Site EnvironmentalEnergySafelyVirtualStephanie Price StephanieEnergyof

  8. Strategic Petroleum Reserve

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014,Zaleski -Blueprint | Department ofofCyber AwarenessFocus Points June

  9. Investigation of oil injection into brine for the Strategic Petroleum Reserve : hydrodynamics and mixing experiments with SPR liquids.

    SciTech Connect (OSTI)

    Castaneda, Jaime N.; Cote, Raymond O.; Torczynski, John Robert; O'Hern, Timothy John

    2004-05-01T23:59:59.000Z

    An experimental program was conducted to study a proposed approach for oil reintroduction in the Strategic Petroleum Reserve (SPR). The goal was to assess whether useful oil is rendered unusable through formation of a stable oil-brine emulsion during reintroduction of degassed oil into the brine layer in storage caverns. An earlier report (O'Hern et al., 2003) documented the first stage of the program, in which simulant liquids were used to characterize the buoyant plume that is produced when a jet of crude oil is injected downward into brine. This report documents the final two test series. In the first, the plume hydrodynamics experiments were completed using SPR oil, brine, and sludge. In the second, oil reinjection into brine was run for approximately 6 hours, and sampling of oil, sludge, and brine was performed over the next 3 months so that the long-term effects of oil-sludge mixing could be assessed. For both series, the experiment consisted of a large transparent vessel that is a scale model of the proposed oil-injection process at the SPR. For the plume hydrodynamics experiments, an oil layer was floated on top of a brine layer in the first test series and on top of a sludge layer residing above the brine in the second test series. The oil was injected downward through a tube into the brine at a prescribed depth below the oil-brine or sludge-brine interface. Flow rates were determined by scaling to match the ratio of buoyancy to momentum between the experiment and the SPR. Initially, the momentum of the flow produces a downward jet of oil below the tube end. Subsequently, the oil breaks up into droplets due to shear forces, buoyancy dominates the flow, and a plume of oil droplets rises to the interface. The interface was deflected upward by the impinging oil-brine plume. Videos of this flow were recorded for scaled flow rates that bracket the equivalent pumping rates in an SPR cavern during injection of degassed oil. Image-processing analyses were performed to quantify the penetration depth and width of the oil jet. The measured penetration depths were shallow, as predicted by penetration-depth models, in agreement with the assumption that the flow is buoyancy-dominated, rather than momentum-dominated. The turbulent penetration depth model overpredicted the measured values. Both the oil-brine and oil-sludge-brine systems produced plumes with hydrodynamic characteristics similar to the simulant liquids previously examined, except that the penetration depth was 5-10% longer for the crude oil. An unexpected observation was that centimeter-size oil 'bubbles' (thin oil shells completely filled with brine) were produced in large quantities during oil injection. The mixing experiments also used layers of oil, sludge, and brine from the SPR. Oil was injected at a scaled flow rate corresponding to the nominal SPR oil injection rates. Injection was performed for about 6 hours and was stopped when it was evident that brine was being ingested by the oil withdrawal pump. Sampling probes located throughout the oil, sludge, and brine layers were used to withdraw samples before, during, and after the run. The data show that strong mixing caused the water content in the oil layer to increase sharply during oil injection but that the water content in the oil dropped back to less than 0.5% within 16 hours after injection was terminated. On the other hand, the sediment content in the oil indicated that the sludge and oil appeared to be well mixed. The sediment settled slowly but the oil had not returned to the baseline, as-received, sediment values after approximately 2200 hours (3 months). Ash content analysis indicated that the sediment measured during oil analysis was primarily organic.

  10. Audit of wet gas processing at Chevron's McKittrick Plant, Naval Petroleum Reserve No. 1, Elk Hills, California

    SciTech Connect (OSTI)

    Not Available

    1987-04-10T23:59:59.000Z

    The purpose of the audit was to determine if: (1) volumes of wet gas delivered to the McKittrick plant were properly calculated and reported; (2) processing fees paid to Chevron conformed to contract provisions; (3) wet gas processing at Chevron's facility was economical; and (4) controls over natural gas liquid sales were adequate. Our review showed that there were weaknesses in internal controls, practices and procedures regarding the Department's management of the wet gas which is processed by Chevron under contract to the Reserve. The findings, recommendations and management comments are synopsized in the Executive Summary.

  11. DOE (US Department of Energy) slates 100,000 bbl/day of oil for SPR (US Strategic Petroleum Reserves) by December 1

    SciTech Connect (OSTI)

    Chayes, A.; Dingell, J.

    1980-09-22T23:59:59.000Z

    DOE, which has been criticized by members of the US House of Representatives Energy and Power Subcommittee for delaying the filling of SPR, has announced that it will start adding 100,000 bbl/day of oil to SPR by 12/1/80. According to A. Chayes (Department of Energy), the oil will be acquired through swaps for Elk Hills field Naval Petroleum Reserves crude. DOE has signed a contract to buy Pacific Refining Company's 10,000 bbl/day of oil from Elk Hills. The oil will be moved to the West Hackberry, LA, SPR storage cavern through the ARCO Four Corners Pipeline. According to J. Dingell (US Congress), SPR could at present, be filled at a 500,000-600,000 bbl/day rate. Chayes said that DOE agrees that 100,000 bbl/day is a minimal and suboptimal rate.

  12. Assessment of impacts and evaluation of restoration methods on areas affected by a well blowout, Naval Petroleum Reserve No. 1, California

    SciTech Connect (OSTI)

    Warrick, G.D.; Kato, T.T.; Phillips, M.V. [and others

    1996-12-01T23:59:59.000Z

    In June 1994, an oil well on Naval Petroleum Reserve No. 1 blew-out and crude oil was deposited downwind. After the well was capped, information was collected to characterize the release and to assess effects to wildlife and plants. Oil residue was found up to 13.7 km from the well site, but deposition was relatively light and the oil quickly dried to form a thin crust on the soil surface. Elevated levels of hydrocarbons were found in livers collected from Heermann`s kangaroo rats (Dipodomys heermanni) from the oiled area but polycyclic aromatic hydrocarbons (known carcinogens or mutagens) were not detected in the livers. Restoration techniques (surface modification and bioremediation) and natural recovery were evaluated within three portions of the oiled area. Herbaceous cover and production, and survival and vigor of desert saltbush (Atriplex polycarpa) were also monitored within each trapping grid.

  13. A Flexible Reservation Algorithm for Advance Network Provisioning

    E-Print Network [OSTI]

    Balman, Mehmet

    2010-01-01T23:59:59.000Z

    A Flexible Reservation Algorithm for Advance Networkusers requirements. Flexible Network Reservation: Wea new service, called Flexible Network Reservation Service,

  14. Distribution, abundance, and habitat use of the endangered blunt-nosed leopard lizard on the Naval Petroleum Reserves, Kern County, California

    SciTech Connect (OSTI)

    Kato, T.T.; Rose, B.R.; O'Farrell, T.P.

    1987-09-01T23:59:59.000Z

    The distribution, abundance, and habitat use of the endangered blunt-nosed leopard lizard, Gambelia silus, was studied on and adjacent to Naval Petroleum Reserves No. 1 (NPR-1, Elk Hills), and No. 2 (NPR-2, Buena Vista), Kern County, CAlifornia. A total of 262 blunt-nosed leopard lizards were seen over 8 years (1979-1987) in 28 sections of NPR-1, 15 sections of NPR-2, and 10 sections adjacent to the petroleum reserves. All but one were in areas of gentle or flat relief with sparse annual ground cover. Home range size and overlap, activity patterns, and habitat use were determined from monitoring blunt-nosed leopard lizards fitted with miniature radiocollars on two study sites. Mean home range size estimated by the minimum polygon method was 2.7 acres for female blunt-nosed leopard lizards, which was significantly smaller than the 5.4 acres mean home range size for males inhabiting a major wash. The structure of the habitat affected significantly the lizards' activity and burrow use. Lizards inhabiting the wash study site were more frequently seen on the surface not associated with a burrow than lizards in the more sparsely vegetated grassland study site (63% compared with 48% of their sightings); 51.5% of the sightings for lizards in the grassland study site were associated with burrows, compared with 37.1% for lizards in the wash study site. Burrows were not shared and some burrows were used more than once (30% of burrows and 62% of burrow sightings).

  15. Reservoir analysis study: Naval Petroleum Reserve No. 1, Elk Hills Field, Kern County, California: Phase 3 report, Recommended additional reservoir engineering analysis

    SciTech Connect (OSTI)

    Not Available

    1988-07-01T23:59:59.000Z

    The basis for completion of the Phase III tasks above were the reports of Phases I and II and the associated backup material. The Phase II report was reviewed to identify the major uncertainties in all of the reserve assignments. In addition to the Proved, Probable and Possible reserves of Phase II, ''potential reserves'' or those associated with a greater degree of risk than the Possible reserves included in the Phase II report, were also identified based on the work performed by Bergeson through the Phase II reporting date. Thirty-three specific studies were identified to address the major Phase II reserve uncertainties or these potential reserves. These studies are listed in Table 1 and are grouped by the Elk Hills pool designation. The basis and need for each study are elaborated in the discussion which follows. Where possible, the need for the study was quantified by associating the study with a particular reserve estimate which would be clarified by the analysis. This reserve value was either the Probable or Possible reserves which were being studied, the potential reserves that were identified, or simply the uncertainty inherent in the proved reserves as identified in the study purpose. The costs associated with performing the study are also shown in Table 1 and were estimated based on Bergeson's knowledge of the Elk Hills reservoirs and data base following Phases I and II, as well as the company's experience in performing similar studies in other fields. The cost estimates are considered reasonable for general budgeting purposes, but may require refinement prior to actual initiation of these studies. This is particularly true for studies involving field testing to obtain additional log, core or test information as the cost of such items is not considered in this report. 51 figs., 46 tabs.

  16. Operating Reserves Billing Rules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E V I L L E P O W E R A D M I N I S T R A T I O N * The FERC approved standard BAL-002-WECC-2 for Contingency Reserves was effective on 10114. * Rules for assigning...

  17. H.R. 4750: A Bill to amend the Energy Policy and Conservation Act to manage the Strategic Petroleum Reserve more effectively, and for other purposes. Introduced in the House of Representatives, One Hundred Third Congress, Second Session, July 13, 1994

    SciTech Connect (OSTI)

    NONE

    1994-12-31T23:59:59.000Z

    The report H.R. 4750 is a bill to amend the Energy Policy and Conservation Act to manage the Strategic Petroleum Reserve more effectively. The proposed legislative text is included.

  18. Property description and fact-finding report for NPR-3 Natrona County, Wyoming. Addendum to 22 August 1996 study of alternatives for future operations of the naval petroleum and oil shale reserves NPR-3

    SciTech Connect (OSTI)

    NONE

    1997-05-01T23:59:59.000Z

    The U.S. Department of Energy has asked Gustavson Associates, Inc. to serve as an Independent Petroleum Consultant under contract DE-AC01-96FE64202. This authorizes a study and recommendations regarding future development of Naval Petroleum Reserve No. 3 (NPR-3) in Natrona County, Wyoming. The report that follows is the Phase I fact-finding and property description for that study. The United States of America owns 100 percent of the mineral rights and surface rights in 9,321-acre NPR-3. This property comprises the Teapot Dome oil field and related production, processing and other facilities. Discovered in 1914, this field has 632 wells producing 1,807 barrels of oil per day. Production revenues are about $9.5 million per year. Remaining recoverable reserves are approximately 1.3 million barrels of oil. Significant plugging and abandonment (P&A) and environmental liabilities are present.

  19. The US Geological Survey-Bureau of Land Management cultural resources program in the National Petroleum Reserve in Alaska, 1977-1981

    SciTech Connect (OSTI)

    Hall, E.S. Jr.; Gal, R.

    1989-01-01T23:59:59.000Z

    Utilization of northern Alaska's riches long predates the recent oil exploration program in the National Petroleum Reserve in Alaska (NPRA). Though the earliest known archaeological site in the reserve dates back only 7600 yr, most archaeologists believe human groups first occupied the area at least 4000 yr earlier. The as-yet-undiscovered physical remains left behind by these first inhabitants of the area, as well as the known and unknown traces of the peoples who succeeded them through time, constitute the cultural resources of the NPRA. First among the laws protecting cultural resources is the Antiquities Act of 1906, which provides for the establishment of national monuments by Presidential proclamation, sets up a permit system for the scientific investigation of cultural resources on Federal land, and details penalities for unauthorized disturbance of archaeological remains. The Archaeological and Historic Preservation Act of 1974, which extended the earlier Reservoir Salvage Act of 1960, authorizes funds for the preservation of historical and archaeological data that otherwise might be lost through any Federal construction project or federally licensed or assisted activity or program. The National Historic Preservation Act of 1966 established the National Register of Historic Places and a National Advisory Council to assist all Federal agencies in evaluating the effects of their actions on properties included, or eligible for inclusion, in the National Register. Finally, Executive Order 11593 of May 13, 1971, requires all Federal agencies to inventory cultural resources on lands they manage or affect in order to determine eligibility for the National Register, and to use due caution in regard to those resources until the inventory, evaluation, and nomination processes are completed. The oil exploration program in the NPRA is subject to this body of law for cultural resource protection.

  20. Final sitewide environmental assessment for preparation for transfer of ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to April 5, 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life as an economically viable oilfield currently estimated to be 2003. Although changes in oil and gas markets or shifts in national policy could alter the economic limit of NPR-3, it productive life will be determined largely by a small and declining reserve base. DOE is proposing certain activities over the next six years in anticipation of the possible transfer of NPR-3 out of Federal operation. These activities would include the accelerated plugging and abandoning of uneconomic wells, complete reclamation and restoration of abandoned sites including dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production, and the continued development of the Rocky Mountain Oilfield Testing Center (RMOTC). DOE has prepared this environmental assessment that analyzes the proposed plugging and abandonment of wells, field restoration and development of RMOTC. Based on the analysis in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). The preparation of an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

  1. EIS-0075: Strategic Petroleum Reserve Phase III Development, Texoma and Seaway Group Salt Domes (West Hackberry and Bryan Mound Expansion, Big Hill Development) Cameron Parish, Louisiana, and Brazoria and Jefferson Counties, Texas

    Broader source: Energy.gov [DOE]

    Also see EIS-0021 and EIS-0029. The Strategic Petroleum Reserve (SPR) Office developed this EIS to assess the environmental impacts of expanding the existing SPR storage capacity from 538 million to 750 million barrels of storage and increasing the drawdown capability from 3.5 million to 4.5 million barrels per day. This EIS incorperates two previously issued EISs: DOE/EIS-0021, Seaway Group of Salt Domes, and DOE/EIS-0029, Texoma Group of Salt Domes.

  2. Post war federal reserve policy

    E-Print Network [OSTI]

    Modrow, William Geoffery

    1953-01-01T23:59:59.000Z

    Direct and Guaranteed 1 p 4 ~ ~ ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 51 Principal Policy actions of Federal Reserve S3f'stems lg'+i 0 i ~ ~ ~ ~ 0 ~ ~ 4 ~ ~ 0 ~ t ~ ~ ~ ~ XX, Sember Sank Reserves and Determinants& 194S-1949 ~ ~ 69 XXX, Yields on United States... a consequence of such action the amount oi' money in the economy ?as determined by the holders of Govern ment securities, Reasures taken by the Federal Reserve to contract bank credit were largely offset by Federal Reserve purchases of Government...

  3. Geologic technical assessment of the Stratton Ridge salt dome, Texas, for potential expansion of the U.S. strategic petroleum reserve.

    SciTech Connect (OSTI)

    Rautman, Christopher Arthur; Snider, Anna C.; Looff, Karl M. (Geologic Consultant, Lovelady, TX)

    2006-11-01T23:59:59.000Z

    The Stratton Ridge salt dome is a large salt diapir located only some ten miles from the currently active Strategic Petroleum Reserve Site at Bryan Mound, Texas. The dome is approximately 15 miles south-southwest of Houston. The Stratton Ridge salt dome has been intensively developed, in the desirable central portions, with caverns for both brine production and product storage. This geologic technical assessment indicates that the Stratton Ridge salt dome may be considered a viable, if less-than-desirable, candidate site for potential expansion of the Strategic Petroleum Reserve (SPR). Past development of underground caverns significantly limits the potential options for use by the SPR. The current conceptual design layout of proposed caverns for such an expansion facility is based upon a decades-old model of salt geometry, and it is unacceptable, according to this reinterpretation of salt dome geology. The easternmost set of conceptual caverns are located within a 300-ft buffer zone of a very major boundary shear zone, fault, or other structural feature of indeterminate origin. This structure transects the salt stock and subdivides it into an shallow western part and a deeper eastern part. In places, the distance from this structural boundary to the design-basis caverns is as little as 150 ft. A 300-ft distance from this boundary is likely to be the minimum acceptable stand-off, from both a geologic and a regulatory perspective. Repositioning of the proposed cavern field is possible, as sufficient currently undeveloped salt acreage appears to be available. However, such reconfiguration would be subject to limitations related to land-parcel boundaries and other existing infrastructure and topographic constraints. More broadly speaking, the past history of cavern operations at the Stratton Ridge salt dome indicates that operation of potential SPR expansion caverns at this site may be difficult, and correspondingly expensive. Although detailed information is difficult to come by, widely accepted industry rumors are that numerous existing caverns have experienced major operational problems, including salt falls, sheared casings, and unintended releases of stored product(s). Many of these difficulties may be related to on-going differential movement of individual salt spines or to lateral movement at the caprock-salt interface. The history of operational problems, only some of which appear to be a matter of public record, combined with the potential for encountering escaped product from other operations, renders the Stratton Ridge salt dome a less-than-desirable site for SPR purposes.

  4. Biological assessment of the effects of petroleum production at maximum efficient rate, Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California, on the endangered blunt-nosed leopard lizard, Gambelia silus

    SciTech Connect (OSTI)

    Kato, T.T.; O'Farrell, T.P.

    1986-06-01T23:59:59.000Z

    Surveys to determine the distribution and relative abundance of blunt-nosed leopard lizards on Naval Petroleum Reserve-1 were conducted in 1980 and 1981. In 1982 radiotelemetry and pitfall trapping techniques were used to gain additional information on the species and develop alternative methods of study. Incidental observations of blunt-nosed leopard lizards were recorded and used in the distribution information for NPR-1. DOE determined during this biological assessment that the construction projects and operational activities necessary to achieve and sustain MER have not adversely affected the blunt-nosed leopard lizard and its habitat, because only approximately 6% of the potential blunt-nosed leopard lizard habitat on NPR-1 was disturbed by construction and operational activities. DOE believes that the direct, indirect, and cumulative effects of MER will not jeopardize the continued existence of the species, because results of surveys indicated that blunt-nosed leopard lizards are mainly distributed near the periphery of Elk Hills where few petroleum developments occurred in the past and where they are unlikely to occur in the future. A policy of conducting preconstruction surveys to protect blunt-nosed leopard lizard habitat was initiated, a habitat restoration plan was developed and implemented, and administrative policies to reduce vehicle speeds, contain oil spills, restrict off-road vehicle (ORV) travel, and to prohibit public access, livestock grazing, and agricultural activities were maintained.

  5. Serologic survey for disease in endangered San Joaquin kit fox, Vulpes macrotis mutica, inhabiting the Elk Hills Naval Petroleum Reserve, Kern County, California

    SciTech Connect (OSTI)

    McCue, P.M.; O'Farrell, T.P.

    1986-07-01T23:59:59.000Z

    Serum from endangered San Joaquin kit foxes, Vulpes macrotis mutica, and sympatric wildlife inhabiting the Elk Hills Petroleum Reserve, Kern County, and Elkhorn Plain, San Luis Obispo County, California, was collected in 1981 to 1982 and 1984, and tested for antibodies against 10 infectious disease pathogens. Proportions of kit fox sera containing antibodies against diseases were: canine parvovirus, 100% in 1981 to 1982 and 67% in 1984; infectious canine hepatitis, 6% in 1981 to 1982 and 21% in 1984; canine distemper, 0 in 1981 to 1982 and 14% in 1984; tularemia, 8% in 1981 to 1982 and 31% in 1984; Brucella abortus, 8% in 1981 to 1982 and 3% in 1984; Brucella canis, 14% in 1981 to 1982 and 0 in 1984; toxoplasmosis, 6% in 1981 to 1982; coccidioidomycosis, 3% in 1981 to 1982; and plague and leptospirosis, 0 in 1981 to 1982. High population density, overlapping home ranges, ability to disperse great distances, and infestation by ectoparasites were cited as possible factors in the transmission and maintenance of these diseases in kit fox populations.

  6. Environmental assessment of a proposed steam flood of the Shallow Oil Zone, Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    The US Department of Energy proposes to develop a limited enhanced oil recovery project in the Shallow Oil Zone at Naval Petroleum Reserve No. 1 (NPR-1) Elk Hills. The project would employ steam forced into the oil-bearing formation through injector wells, and would involve two phases. The initiation of the second phase would be dependent on the economic success of the first phase. The total project would require the drilling of 22 new wells in a 45-acre area supporting seven existing production wells. It would also require construction of various surface facilities including a tank setting (gas-oil separation system), steam generators, and a water treatment plant. Adverse environmental impacts associated with the proposed steam flood project would include the effects on vegetation, wildlife and land-use resulting from the total reconfiguration of the topography within the project bondaries. Other adverse impacts include the emission of oxides of nitrogen, carbon monoxide, hydrocarbons and particulates from steam generators, vehicles and associated surface facilities. Minor adverse impacts include localized noise and dust during constuction, and reduction of visual quality. 48 refs., 7 figs., 10 tabs.

  7. Report on inspection of concerns regarding DOE`s evaluation of Chevron USA`s unsolicited proposal for the Elk Hills Naval Petroleum Reserve

    SciTech Connect (OSTI)

    NONE

    1997-11-17T23:59:59.000Z

    An allegation was made to the Office of Inspector General (OIG) that the integrity of the Department of Energy`s (DOE) unsolicited proposal review process may have been compromised by the actions of a former Deputy Secretary of Energy and his Executive Assistant during the review of an unsolicited proposal received from Chevron U.S.A. Production Company (Chevron) in may 1993. The Chevron unsolicited proposal was for the management and operation of DOE`s Elk Hills Naval Petroleum Reserve (Elk Hills), located near Bakersfield, California. Chevron submitted the unsolicited proposal on May 19, 1993. DOE formally rejected Chevron`s unsolicited proposal in May 1995. Although Chevron`s unsolicited proposal was eventually rejected by DOE, the complainant specifically alleged that the {open_quotes}sanctity, integrity, and sensitivity{close_quotes} of the unsolicited proposal review process had been breached in meetings during the Fall of 1993 between Chevron officials, the Deputy Secretary of Energy (Deputy Secretary), and his Executive Assistant. Based on our review of the allegation, we identified the following issue as the focus of our inspection.

  8. Mine-induced sinkholes over the U.S. Strategic Petroleum Reserve (SPR) Storage Facility at Weeks Island, Louisiana: geological mitigation and environmental monitoring

    SciTech Connect (OSTI)

    Neal, J.T.

    1997-03-01T23:59:59.000Z

    A sinkhole formed over the former salt mine used for crude oil storage by the U.S. Strategic Petroleum Reserve at Weeks Island, Louisiana. This created a dilemma because in-mine grouting was not possible, and external grouting, although possible, was impractical. However, environmental protection during oil withdrawal and facility decommissioning was considered critical and alternative solutions were essential. Mitigation of, the sinkhole growth over the salt mine was accomplished by injecting saturated brine directly into the sinkhole throat, and by constructing a cylindrical freeze curtain around and into the dissolution orifice at the top of the salt dome. These measures vastly reduced the threat of major surface collapse around the sinkhole during oil transfer and subsequent brine backfill. The greater bulk of the crude oil was removed from the mine during 1995-6. Final skimming operations will remove residual oil trapped in low spots, concurrent with initiating backfill of the mine with saturated brine. Environmental monitoring during 1995-9 will assure that environmental surety is achieved.

  9. Application of the multi-mechanism deformation model for three-dimensional simulations of salt : behavior for the strategic petroleum reserve.

    SciTech Connect (OSTI)

    Ehgartner, Brian L.; Sobolik, Steven Ronald; Bean, James E.

    2010-07-01T23:59:59.000Z

    The U.S. Strategic Petroleum Reserve stores crude oil in 62 solution-mined caverns in salt domes located in Texas and Louisiana. Historically, three-dimensional geomechanical simulations of the behavior of the caverns have been performed using a power law creep model. Using this method, and calibrating the creep coefficient to field data such as cavern closure and surface subsidence, has produced varying degrees of agreement with observed phenomena. However, as new salt dome locations are considered for oil storage facilities, pre-construction geomechanical analyses are required that need site-specific parameters developed from laboratory data obtained from core samples. The multi-mechanism deformation (M-D) model is a rigorous mathematical description of both transient and steady-state creep phenomena. Recent enhancements to the numerical integration algorithm within the model have created a more numerically stable implementation of the M-D model. This report presents computational analyses to compare the results of predictions of the geomechanical behavior at the West Hackberry SPR site using both models. The recently-published results using the power law creep model produced excellent agreement with an extensive set of field data. The M-D model results show similar agreement using parameters developed directly from laboratory data. It is also used to predict the behavior for the construction and operation of oil storage caverns at a new site, to identify potential problems before a final cavern layout is designed.

  10. Operating Reserves and Variable Generation

    SciTech Connect (OSTI)

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01T23:59:59.000Z

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  11. Energy Smart Reserved Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000Consumption Survey (CBECS)LaboratorySmart-Reserved-Power Sign In

  12. Parking Options 2011/12 Reserved Permits

    E-Print Network [OSTI]

    Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

  13. Library Reserved Room Policy All Meeting Spaces

    E-Print Network [OSTI]

    Mather, Patrick T.

    Library Reserved Room Policy All Meeting Spaces Room reservation To make a reservation for any Library meeting space, complete the room reservation form at http://library.syr.edu/services/space/form-findroom.php. In order to provide equitable access to library spaces, the Library may impose limitations on frequency

  14. Using short time pressure buildup tests to calculate gas reserves

    E-Print Network [OSTI]

    Vu, Trang Dinh

    1990-01-01T23:59:59.000Z

    Committee: Dr. Steven W. Poston The material balance method is commonly used in the petroleum industry for gas reserves estimation. This method requires accurate measurements of static reservoir pressures to obtain good results. The static reservoir... for gas reserves estimation does not require any pressure-production data, it does require the knowledge of area, thickness and porosity of the reservoir which could be difficult to be accurately measured. The material balance method which can...

  15. Producing Light Oil from a Frozen Reservoir: Reservoir and Fluid Characterization of Umiat Field, National Petroleum Reserve, Alaska

    SciTech Connect (OSTI)

    Hanks, Catherine

    2012-12-31T23:59:59.000Z

    Umiat oil field is a light oil in a shallow, frozen reservoir in the Brooks Range foothills of northern Alaska with estimated oil-in-place of over 1 billion barrels. Umiat field was discovered in the 1940s but was never considered viable because it is shallow, in the permafrost, and far from any transportation infrastructure. The advent of modern drilling and production techniques has made Umiat and similar fields in northern Alaska attractive exploration and production targets. Since 2008 UAF has been working with Renaissance Alaska Inc. and, more recently, Linc Energy, to develop a more robust reservoir model that can be combined with rock and fluid property data to simulate potential production techniques. This work will be used to by Linc Energy as they prepare to drill up to 5 horizontal wells during the 2012-2013 drilling season. This new work identified three potential reservoir horizons within the Cretaceous Nanushuk Formation: the Upper and Lower Grandstand sands, and the overlying Ninuluk sand, with the Lower Grandstand considered the primary target. Seals are provided by thick interlayered shales. Reserve estimates for the Lower Grandstand alone range from 739 million barrels to 2437 million barrels, with an average of 1527 million bbls. Reservoir simulations predict that cold gas injection from a wagon-wheel pattern of multilateral injectors and producers located on 5 drill sites on the crest of the structure will yield 12-15% recovery, with actual recovery depending upon the injection pressure used, the actual Kv/Kh encountered, and other geologic factors. Key to understanding the flow behavior of the Umiat reservoir is determining the permeability structure of the sands. Sandstones of the Cretaceous Nanushuk Formation consist of mixed shoreface and deltaic sandstones and mudstones. A core-based study of the sedimentary facies of these sands combined with outcrop observations identified six distinct facies associations with distinctive permeability trends. The Lower Grandstand sand consists of two coarsening-upward shoreface sands sequences while the Upper Grandstand consists of a single coarsening-upward shoreface sand. Each of the shoreface sands shows a distinctive permeability profile with high horizontal permeability at the top getting progressively poorer towards the base of the sand. In contrast, deltaic sandstones in the overlying Ninuluk are more permeable at the base of the sands, with decreasing permeability towards the sand top. These trends impart a strong permeability anisotropy to the reservoir and are being incorporated into the reservoir model. These observations also suggest that horizontal wells should target the upper part of the major sands. Natural fractures may superimpose another permeability pattern on the Umiat reservoir that need to be accounted for in both the simulation and in drilling. Examination of legacy core from Umiat field indicate that fractures are present in the subsurface, but don't provide information on their orientation and density. Nearby surface exposures of folds in similar stratigraphy indicate there are at least three possible fracture sets: an early, N/S striking set that may predate folding and two sets possibly related to folding: an EW striking set of extension fractures that are parallel to the fold axes and a set of conjugate shear fractures oriented NE and NW. Analysis of fracture spacing suggests that these natural fractures are fairly widely spaced (25-59 cm depending upon the fracture set), but could provide improved reservoir permeability in horizontal legs drilled perpendicular to the open fracture set. The phase behavior of the Umiat fluid needed to be well understood in order for the reservoir simulation to be accurate. However, only a small amount of Umiat oil was available; this oil was collected in the 1940s and was severely weathered. The composition of this dead Umiat fluid was characterized by gas chromatography. This analysis was then compared to theoretical Umiat composition derived using the Pedersen method with original Umiat

  16. EIS-0012: Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve #1, Elk Hills, Kern County, California (also see EA-0261, EA-0334, and EIS-0158-S)

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy prepared this statement to evaluate the environmental impacts of increasing petroleum production, and of additional or expanded operational facilities, at Elk Hills from 160,000 barrels per day up to 240,000 barrels per day.

  17. Northeast Home Heating Oil Reserve - Guidelines for Release ...

    Office of Environmental Management (EM)

    Heating Oil Reserve Northeast Home Heating Oil Reserve - Guidelines for Release Northeast Home Heating Oil Reserve - Guidelines for Release The Energy Policy and Conservation...

  18. Biological assessment of the effects of petroleum production at maximum efficient rate, Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California, on the endangered San Joaquin kit fox, Vulpes macrotis mutica

    SciTech Connect (OSTI)

    O'Farrell, T.P.; Harris, C.E.; Kato, T.T.; McCue, P.M.

    1986-06-01T23:59:59.000Z

    Between 1980 and 1986 DOE sponsored field studies to gather sufficient information to determine the status of the species on Naval Petroleum Reserve-1 and to evaluate the possible effects of MER. Transect surveys were conducted in 1979 and 1984 to document the distribution and relative density of fox dens. Radiotelemetry studies were initiated to provide information on reproductive success, den use patterns, responses to petroleum field activities, food habits, movement patterns and home ranges, and sources and rates of mortality. Techniques for conducting preconstruction surveys to minimize possible negative effects of MER activities on foxes plus a habitat restoration program were developed and implemented. DOE determined during this biological assessment that the construction projects and operational activities necessary to achieve and sustain MER may have adversely affected the San Joaquin kit fox and its habitat. However, the direct, indirect, and cumulative effects of MER will not jeopardize the continued existence of the species because: (1) results of the extensive field studies did not provide evidence that MER effected negative changes in relative abundance, reproductive success, and dispersal of the species; (2) a successful policy of conducting preconstruction surveys to protect kit fox, their dens, and portions of their habitat was initiated; (3) the Secretary of the Interior did not designate critical habitat; (4) a habitat restoration plan was developed and implemented; (5) a monitoring program was implemented to periodically assess the status of kit fox; (6) a coyote control program was established with FWS to reduce predation on fox; and (7) administrative policies to reduce vehicle speeds, contain oil spills, restrict off-road vehicle (ORV) travel, and to prohibit hunting, trapping, livestock grazing, and agricultural activities, were maintained to protect kit fox.

  19. Finding of No Significant Impact for the Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31T23:59:59.000Z

    DOE has prepared an Environmental Assessment (EA), DOE/EA-1497, for the proposed replacement of the existing 107 centimeter (cm) [42 inch (in)] 6.87 kilometer (km) [4.27 mile (mi)] raw water intake pipeline (RWIPL). This action is necessary to allow for continued, optimum operations at the West Hackberry facility (main site/facility). The EA described the proposed action (including action alternatives) and three alternatives to the proposed action. The EA evaluated only the potential environmental consequences of the proposed action (one action alternative), and Alternative 3, which consisted of the No Build Action that is required by 10 CFR 1021.321(c). Based on the analysis in DOE/EA-1497, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting humans or the natural environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 USC 4321 et seq. Therefore, an Environmental Impact Statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI). To further minimize impacts to environmental media, the DOE will also implement a Mitigation Action Plan (MAP) for this action. The MAP is included as Appendix F of this EA, which is appended to this FONSI. The Energy Policy and Conservation Act of 1975 (EPCA), as amended, authorizes the creation of the Strategic Petroleum Reserve (SPR) to store crude oil to reduce the United States' vulnerability to energy supply disruptions. Crude oil is stored in geologic formations, or salt domes, located under these facilities. The purpose of this proposed project is to construct a new RWIPL at the main site to replace the existing RWIPL which services this facility.

  20. Results of analyses of fur samples from the San Joaquin Kit Fox and associated soil and water samples from the Naval Petroleum Reserve No. 1, Tupman, California

    SciTech Connect (OSTI)

    Suter, G.W. II; Rosen, A.E.; Beauchamp, J.J. [Oak Ridge National Lab., TN (United States); Kato, T.T. [EG and G Energy Measurements, Inc., Tupman, CA (United States)

    1992-12-01T23:59:59.000Z

    The purpose of this study was to determine whether analysis of the elemental content of fur from San Joaquin kit foxes (Vulpes macrotis mutica) and of water and soil from kit fox habitats could be used to make inferences concerning the cause of an observed decline in the kit fox population on Naval Petroleum Reserve No. 1 (NPR-1). Fur samples that had been collected previously from NPR-1, another oil field (NPR-2), and two sites with no oil development were subjected to neutron activation analysis. In addition, soil samples were collected from the home ranges of individual foxes from undisturbed portions of major soil types on NPR-1 and from wastewater samples were collected from tanks and sumps and subjected to neutron activation analysis. Most elemental concentrations in fur were highest at Camp Roberts and lowest on the undeveloped portions of NPR-I. Fur concentrations were intermediate on the developed oil fields but were correlated with percent disturbance and with number of wells on NPR-1 and NPR-2. The fact that most elements covaried across the range of sites suggests that some pervasive source such as soil was responsible. However, fur concentrations were not correlated with soft concentrations. The kit foxes on the developed portion of NPR-1 did not have concentrations of elements in fur relative to other sites that would account for the population decline in the early 1980s. The oil-related elements As, Ba, and V were elevated in fox fur from oil fields, but only As was sufficiently elevated to suggest a risk of toxicity in individual foxes. However, arsenic concentrations suggestive of sublethal toxicity were found in only 0.56% of foxes from developed oil fields, too few to account for a population decline.

  1. Offshore oceanographic and environmental monitoring services for the Strategic Petroleum Reserve. Volume I. Appendices. Annual report for the Bryan Mound Site, September 1982-August 1983

    SciTech Connect (OSTI)

    None

    1984-03-01T23:59:59.000Z

    The Department of Energy's Strategic Petroleum Reserve Program began leaching the Bryan Mound salt dome and discharging brine into the coastal waters offshore of Freeport, Texas on March 10, 1980. This report describes the findings of a team of Texas A and M University scientists and engineers who have conducted a study to evaluate the effects of the Bryan Mound brine discharge on the marine environment. The study addresses the areas of physical oceanography, analysis of the discharge plume, water and sediment quality, nekton, benthos and data management. It focuses on the period from September 1982 through August 1983. The ambient physical environment and its temporal and spatial variability were studied by means of continuously recording in situ current/conductivitiy/temperature meters and twelve, one-day synoptic hydrographic cruises. The quarterly water and sediment quality data show a small increase in salinity, sodium and chloride ions occurs in the bottom waters and sediment pore waters near the diffuser relative to those values measured at stations farther away. Data from the brine plume study for this reporting study show the largest areal extent within the +1 o/oo above ambient salinity contour was 40.0 km/sup 2/ which occurred on August 11, 1983. It appears that brine disposal at Bryan Mound has had neglible if any influence on the nekton community surrounding the diffuser. The benthic quarterly data from 26 stations, including 7 collections made after the diffuser outflow rate was increased to 1,000,000 barrels/day, show the total numbers of species at the diffuser station were higher than most other nearfield stations as well as many farfield stations in both the pre- and post-1,000,000 barrels/day brine flow periods. 138 references, 175 figures, 53 tables.

  2. Estimation of resources and reserves

    E-Print Network [OSTI]

    Massachusetts Institute of Technology. Energy Laboratory.

    1982-01-01T23:59:59.000Z

    This report analyzes the economics of resource and reserve estimation. Current concern about energy problems has focused attention on how we measure available energy resources. One reads that we have an eight-year oil ...

  3. Reserves, Refuges, and Sanctuaries (Nebraska)

    Broader source: Energy.gov [DOE]

    This chapter provides rules for the establishment of wildlife reserves, refuges, sanctuaries, and other natural areas on land and water bodies. The Game and Parks Commission has the authority to...

  4. Reserves hike to buoy Bontang LNG

    SciTech Connect (OSTI)

    Not Available

    1992-07-27T23:59:59.000Z

    This paper reports that a redetermination of reserves in an Indonesian production sharing contract (PSC) will boost liquefied natural gas sales for an Indonesian joint venture (IJV) of Lasmo plc, Union Texas (South East Asia) Inc., Chinese Petroleum Corp. (CPC), and Japex Rantau Ltd. The Indonesian reserves increase involves the Sanga PSC operated by Virginia Indonesia Co., a 50-50 joint venture of Lasmo and Union Texas. Union Texas holds a 38% interest in the IJV and Lasmo 37.8%, with remaining interests held by CPC and Japex. meantime, in US LNG news: Shell LNG Co. has shelved plans to buy an added interest in the LNG business of Columbia Gas System Inc. Panhandle Eastern Corp. units Trunkline Gas Co., Trunkline LNG Co., and Panhandle Eastern Pipe Line Co. (PEPL) filed settlement agreements with the Federal Energy Regulatory Commission to recover from customers $243 million in costs associated with Panhandle's Trunkline LNG operation at Lake Charles, Louisiana.

  5. Naval Petroleum Reserve. Hearing before the Subcommittee on Fossil and Synthetic Fuels of the Committee on Energy and Commerce, House of Representatives, Ninety-Seventh Congress, First Session, November 3, 1981

    SciTech Connect (OSTI)

    Not Available

    1982-01-01T23:59:59.000Z

    A November 3, 1981 hearing reviewed President Reagan's proposal to continue the 180,000 barrels per day of oil and 320 million cubic foot per day of gas production at the Elk Hills, California Naval Petroleum Reserve No. 1. Without approval by both Houses, production will automatically be reduced to the minimum level. At issue are national security, the value of $2 billion in receipts from Elk Hills oil sales, and the local impacts of a decision to continue or reduce production. The statements of 11 witnesses from the public and private sectors are followed by additional materials submitted for the record. (DCK)

  6. Environmental Assessment for the Proposed Increase in the Facility Capacity and Petroleum Inventory at the Strategic Petroleum Reserve's Bryan Mound Storage Facility, Texas

    SciTech Connect (OSTI)

    N /A

    2004-11-24T23:59:59.000Z

    The DOE proposes that the authorized capacity of the BM facility and, upon Administration authorization, the petroleum inventory be increased by 3.5 million m{sup 3} (22 MMB). The proposed action may be subdivided into two distinct actions, the action to increase the facility capacity and the action to increase the facility's petroleum inventory, which is conditioned upon future authorization by the Administration. A portion of the proposed increase in facility capacity would be obtained via modification of the existing internal cavern infrastructure. Specifically, of the proposed increase in cavern capacity, up to 1.4 million m{sup 3} (8.8 MMB) would result from adjustment of the suspended casing of 10 caverns, thereby increasing the working cavern volumes without changing the cavern dimensions. The balance of the proposed increase to facility capacity, 2.1 million m{sup 3} (13.2 MMB), would result from administrative activities including the return of cavern 112 to service at its full capacity [approximately 1.9 million m{sup 3} (12 MMB)] and volume upgrades of at least 0.19 million m{sup 3} (1.2 MMB) based on new information obtained during sonar investigation of caverns.

  7. Spinning Reserve From Responsive Loads

    SciTech Connect (OSTI)

    Kirby, B.J.

    2003-04-08T23:59:59.000Z

    Responsive load is the most underutilized reliability resource available to the power system today. It is currently not used at all to provide spinning reserve. Historically there were good reasons for this, but recent technological advances in communications and controls have provided new capabilities and eliminated many of the old obstacles. North American Electric Reliability Council (NERC), Federal Energy Regulatory Commission (FERC), Northeast Power Coordinating Council (NPCC), New York State Reliability Council (NYSRC), and New York Independent System Operator (NYISO) rules are beginning to recognize these changes and are starting to encourage responsive load provision of reliability services. The Carrier ComfortChoice responsive thermostats provide an example of these technological advances. This is a technology aimed at reducing summer peak demand through central control of residential and small commercial air-conditioning loads. It is being utilized by Long Island Power Authority (LIPA), Consolidated Edison (ConEd), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E). The technology is capable of delivering even greater response in the faster spinning reserve time frame (while still providing peak reduction). Analysis of demand reduction testing results from LIPA during the summer of 2002 provides evidence to back up this claim. It also demonstrates that loads are different from generators and that the conventional wisdom, which advocates for starting with large loads as better ancillary service providers, is flawed. The tempting approach of incrementally adapting ancillary service requirements, which were established when generators were the only available resources, will not work. While it is easier for most generators to provide replacement power and non-spinning reserve (the slower response services) than it is to supply spinning reserve (the fastest service), the opposite is true for many loads. Also, there is more financial reward for supplying spinning reserve than for supplying the other reserve services as a result of the higher spinning reserve prices. The LIPAedge program (LIPA's demand reduction program using Carrier ComfortChoice thermostats) provides an opportunity to test the use of responsive load for spinning reserve. With potentially 75 MW of spinning reserve capability already installed, this test program can also make an important contribution to the capacity needs of Long Island during the summer of 2003. Testing could also be done at ConEd ({approx}30 MW), SCE ({approx}15 MW), and/or SDG&E ({approx}15 MW). This paper is divided into six chapters. Chapter 2 discusses the contingency reserve ancillary services, their functions in supporting power system reliability, and their technical requirements. It also discusses the policy and tariff requirements and attempts to distinguish between ones that are genuinely necessary and ones that are artifacts of the technologies that were historically used to provide the services. Chapter 3 discusses how responsive load could provide contingency reserves (especially spinning reserve) for the power system. Chapter 4 specifically discusses the Carrier ComfortChoice responsive thermostat technology, the LIPAedge experience with that technology, and how the technology could be used to supply spinning reserve. Chapter 5 discusses a number of unresolved issues and suggests areas for further research. Chapter 6 offers conclusions and recommendations.

  8. Sustainable growth and valuation of mineral reserves

    E-Print Network [OSTI]

    Adelman, Morris Albert

    1994-01-01T23:59:59.000Z

    The annual change in the value of an in-ground mineral is equal to the increase or decrease of inventories ("reserves"), multiplied by the market value of a reserve unit. The limited shrinking resource base does not exist. ...

  9. Group Study Room Policy and Reservation Form

    E-Print Network [OSTI]

    Reynolds, Albert C.

    to the Group Study Reservation Form. Fill out the web form and click "Send" to submit the request. A confirming

  10. Estimates of Oil Reserves Jean Laherrere

    E-Print Network [OSTI]

    O'Donnell, Tom

    Estimates of Oil Reserves Jean Laherrere e-mail: jean.laherrere@wanadoo.fr sites: http will solve the present problems on welfare, retirement and they would dearly love to see the reserves of oil or oil reserves is a political act. The SEC, to satisfy bankers and shareholders, obliges the oil

  11. Mark Redekopp, All rights reserved Electrical Engineering

    E-Print Network [OSTI]

    Leahy, Richard M.

    Mark Redekopp, All rights reserved Electrical Engineering at USC What it means to you... Mark Redekopp redekopp@usc.edu ENGR 101 #12; Mark Redekopp, All rights reserved What is Electrical Engineering #12; Mark Redekopp, All rights reserved What is Electrical Engineering The key partner and enabling

  12. BODEGA MARINE LABORATORY AND RESERVE Procedures & Policies

    E-Print Network [OSTI]

    Schladow, S. Geoffrey

    from the Reserve Staff to walk on the Reserve (this includes the sand dunes near the housing facilities. Abandoned seal and sea lion pups should be left alone. Mothers of these pups are probably out hunting and will return in several hours. Report abandoned pups and injured mammals to the Reserve Staff or Main Office

  13. Fact #578: July 6, 2009 World Oil Reserves, Production, and Consumptio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production, and Consumption, 2007 The United States was responsible for 8% of the world's petroleum production, held 2% of the world's crude oil reserves, and consumed 24% of the...

  14. Systematic Comparison of Operating Reserve Methodologies: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Krad, I.; Ela, E.

    2014-04-01T23:59:59.000Z

    Operating reserve requirements are a key component of modern power systems, and they contribute to maintaining reliable operations with minimum economic impact. No universal method exists for determining reserve requirements, thus there is a need for a thorough study and performance comparison of the different existing methodologies. Increasing penetrations of variable generation (VG) on electric power systems are posed to increase system uncertainty and variability, thus the need for additional reserve also increases. This paper presents background information on operating reserve and its relationship to VG. A consistent comparison of three methodologies to calculate regulating and flexibility reserve in systems with VG is performed.

  15. Petroleum Reserves | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you wantJoin us for #SpaceWeekOMB Policies2.0AboutCarbon

  16. Petroleum Reserves | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732onMakeEducationRemediation »PeerBriefingsPeter

  17. EIS-0068: Development Policy Options for the Naval Oil Shale Reserves in Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy Office of Naval Petroleum and Oil Shale Reserves prepared this programmatic statement to examine the environmental and socioeconomic impacts of development projects on the Naval Oil Shale Reserve 1, and examine select alternatives, such as encouraging production from other liquid fuel resources (coal liquefaction, biomass, offshore oil and enhanced oil recovery) or conserving petroleum in lieu of shale oil production.

  18. Demand Response Spinning Reserve Demonstration

    SciTech Connect (OSTI)

    Eto, Joseph H.; Nelson-Hoffman, Janine; Torres, Carlos; Hirth,Scott; Yinger, Bob; Kueck, John; Kirby, Brendan; Bernier, Clark; Wright,Roger; Barat, A.; Watson, David S.

    2007-05-01T23:59:59.000Z

    The Demand Response Spinning Reserve project is a pioneeringdemonstration of how existing utility load-management assets can providean important electricity system reliability resource known as spinningreserve. Using aggregated demand-side resources to provide spinningreserve will give grid operators at the California Independent SystemOperator (CAISO) and Southern California Edison (SCE) a powerful, newtool to improve system reliability, prevent rolling blackouts, and lowersystem operating costs.

  19. Energy Information Administration/Petroleum Marketing Annual

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    . . . . . . . . . . . . . April 1987 Determining Minimum Acceptable Bid Prices for the Test Sale of Strategic Petroleum Reserve Crude Oil . . . . . . . . . . . . . . . . . . . . ....

  20. BIOSPHERE RESERVES MANAGER'S SURVEY In preparation for the October 1995 Biosphere Reserves Managers'

    E-Print Network [OSTI]

    BIOSPHERE RESERVES MANAGER'S SURVEY In preparation for the October 1995 Biosphere Reserves Managers' Workshop, William Gregg of the National Biological Service, surveyed the managers' perceptions about as important. For additional information on the Biosphere Reserves Managers' Survey please contact: Dr. William

  1. Effective Immediately - OASIS Reservation Points Suspended -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Effective Immediately - OASIS Reservation Points...

  2. WELCOME TO THE ELECTRONIC RESERVES COURSE READINGS

    E-Print Network [OSTI]

    Shrader-Frechette, Kristin

    WELCOME TO THE ELECTRONIC RESERVES COURSE READINGS NOTE: THIS MATERIAL MAY BE PROTECTED animals--ingesting food, digesting it, assimilating it, excreting waste, reproducing, and being mobile

  3. Sandia National Laboratories: SolarReserve Inc.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Events, Partnership, Renewable Energy, Solar, Solar Newsletter SolarReserve is testing engineering units at the National Solar Thermal Test Facility (NSTTF) operated by Sandia....

  4. Draft "Michigan Saves" Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    A sample loan loss reserve agreement between a state or local government and a financial institution setting the terms and conditions of the loan loss reserve fund.

  5. Billing Factors for Operating Reserves September 30, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are effective on October 1, 2014. This implements the FERC approved standard BAL-002-WECC-2. Operating Reserve - Spinning Reserve: The Billing Factor for the rates specified in...

  6. Northeast Home Heating Oil Reserve System Heating Oil, PIA Office...

    Energy Savers [EERE]

    Northeast Home Heating Oil Reserve System Heating Oil, PIA Office of Fossil Energy Headquaters Northeast Home Heating Oil Reserve System Heating Oil, PIA Office of Fossil Energy...

  7. Energy Department Announces First Regional Gasoline Reserve to...

    Office of Environmental Management (EM)

    Announces First Regional Gasoline Reserve to Strengthen Fuel Resiliency Energy Department Announces First Regional Gasoline Reserve to Strengthen Fuel Resiliency May 2, 2014 -...

  8. Einstein Room Reservations Rules and Regulations

    E-Print Network [OSTI]

    Yates, Andrew

    Einstein Room Reservations Rules and Regulations Before Reservation: Requests are not confirmed Activities, Joan Junger, (718) 430-2105 or student.activities@einstein.yu.edu. A meeting or conversation in accordance to Albert Einstein College of Medicine's Alcohol Policy. Before your request is confirmed you must

  9. Case Western Reserve University Chart of Accounts

    E-Print Network [OSTI]

    Rollins, Andrew M.

    Case Western Reserve University Chart of Accounts July 7, 2004 1 SPEEDTYPE / PROJECT PREFIXES Funds PLT Plant CIP Construction in Progress #12;Case Western Reserve University Chart of Accounts July Annual Fund Gift RES Research TRN Training SPC Special Programs/Projects OSA Other Sponsored Activities

  10. Case Western Reserve University Chart of Accounts

    E-Print Network [OSTI]

    Rollins, Andrew M.

    Case Western Reserve University Chart of Accounts July 7, 2004 1 ACCOUNTS 10000 - 199999 Asset of the following: ANN LON CIP OPR CSR OSA END PLT FHB RES INC SPC INS TRN All other SpeedTypes will populate the Account field for you. #12;Case Western Reserve University Chart of Accounts July 7, 2004 2 Asset Accounts

  11. GPRS-Based Cinema Ticket Reservation System

    E-Print Network [OSTI]

    Science and Engineering. This MSC project implements a mobile Location Aware Cinema Ticket Reser- vationGPRS-Based Cinema Ticket Reservation System Mihai Balan Kongens Lyngby 2007 IMM-2007-7b #12 is called Cinema Ticket Reservation System and it can determine user's current position, allow users

  12. Reservations | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection Technical s OverviewB&W Y-12 LLC for the NationalReservations To

  13. Drilling fluids and reserve pit toxicity

    SciTech Connect (OSTI)

    Leuterman, A.J.J.; Jones, F.V.; Chandler, J.E. (M-I Drilling Fluids Co. (US))

    1988-11-01T23:59:59.000Z

    Drilling fluids are now classified as exempt under the Resource Conservation and Recovery Act (RCRA) hazardous waste laws. Since 1986, however, the U.S. Environmental Protection Agency (EPA) has been studying reserve pit contents to determine whether oilfield wastes should continue under this exemption. Concerns regarding reserve pit contents and disposal practices have resulted in state and local governmental regulations that limit traditional methods of construction, closure, and disposal of reserve pit sludge and water. A great deal of attention and study has been focused on drilling fluids that eventually reside in reserve pits. In-house studies show that waste from water-based drilling fluids plays a limited role (if any) in possible hazards associated with reserve pits. Reserve pit water samples and pit sludge was analyzed and collated. Analyses show that water-soluble heavy metals (Cr, Pb, Zn and Mn) in reserve pits are generally undetectable or, if found in the total analysis, are usually bound to clays or organics too tightly to exceed the limitations as determined by the EPA toxicity leachate test. The authors' experience is that most contamination associated with reserve pits involves high salt content from produced waters and/or salt formations, lead contamination from pipe dope, or poorly designed pits, which could allow washouts into surface waters or seepage into groundwater sources. The authors' analyses show that reserve its associated with water-based drilling fluid operations should not be classified as hazardous; however, careful attention attention should be paid to reserve pit construction and closure to help avoid any adverse environmental impact.

  14. US coal reserves: A review and update

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    This report is the third in series of ``U.S. Coal Reserves`` reports. As part of the Administration of the Energy Information Administration (EIA) program to provide information on coal, it presents detailed estimates of domestic coal reserves, which are basic to the analysis and forecasting of future coal supply. It also describes the data, methods, and assumptions used to develop such estimates and explain terminology related to recent data programs. In addition, the report provides technical documentation for specific revisions and adjustments to the demonstrated reserve base (DRB) of coal in the United States and for coal quality and reserve allocations. It makes the resulting data available for general use by the public. This report includes data on recoverable coal reserves located at active mines and on the estimated distribution of rank and sulfur content in those reserves. An analysis of the projected demand and depletion in recoverable reserves at active mines is used to evaluate the areas and magnitude of anticipated investment in new mining capacity.

  15. A critical review of methods used in the estimation of natural gas reserves

    E-Print Network [OSTI]

    Gruy, Henry Jones

    1956-01-01T23:59:59.000Z

    for the de- gree of PROFESSIONAL ENGINEER MA JOR SU% JEGT: PETROLEUM ENGINEERING itay f956 A GR1TLGAL REVXE? 0$' METHODS gSED THE ESTIMATION op NATURAL GAS RESERVES 8y Henry J. Gruy Approved as to style and content by Ghairman of C, ommittee hiay... Reserves 21 Refereaces 22 CO LA CA 4J CO 2'79098 TASLE OF ILLUSTRATIONS A CRITICAL REVIEW Ol' METHODS USED IN THE ESTIMATION QF NATURAL GAS RESERVE Curves Curve No. Curves Showing Change in the Compres- sibility Factor with Depth and Gomposf...

  16. Habitat reclamation plan to mitigate for the loss of habitat due to oil and gas production activities under maximum efficient rate, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    Anderson, D.C.

    1994-11-01T23:59:59.000Z

    Activities associated with oil and gas development under the Maximum Efficiency Rate (MER) from 1975 to 2025 will disturb approximately 3,354 acres. Based on 1976 aerial photographs and using a dot grid methodology, the amount of land disturbed prior to MER is estimated to be 3,603 acres. Disturbances on Naval Petroleum Reserve No. 1 (NPR-1) were mapped using 1988 aerial photography and a geographical information system. A total of 6,079 acres were classified as disturbed as of June, 1988. The overall objective of this document is to provide specific information relating to the on-site habitat restoration program at NPRC. The specific objectives, which relate to the terms and conditions that must be met by DOE as a means of protecting the San Joaquin kit fox from incidental take are to: (1) determine the amount and location of disturbed lands on NPR-1 and the number of acres disturbed as a result of MER activities, (2) develop a long term (10 year) program to restore an equivalent on-site acres to that lost from prior project-related actions, and (3) examine alternative means to offset kit fox habitat loss.

  17. Aurora Cassandra Elmore ALL RIGHTS RESERVED

    E-Print Network [OSTI]

    [2009] Aurora Cassandra Elmore ALL RIGHTS RESERVED #12;LATE PLEISTOCENE CHANGES IN NORTHERN COMPONENT WATER: INFERENCES FROM GEOCHEMICAL AND SEDIMENTOLOGICAL RECORDS FROM GARDAR DRIFT by AURORA FROM GEOCHEMICAL AND SEDIMENTOLOGICAL RECORDS FROM GARDAR DRIFT by AURORA CASSANDRA ELMORE Dissertation

  18. Siemens AG 2009. All rights reserved. Investitionsmanagement

    E-Print Network [OSTI]

    Manstein, Dietmar J.

    Siemens AG 2009. All rights reserved. Investitionsmanagement Wie steuert man erfolgreich Investitionen? - Tools eines erfolgreichen, globalen Industrieunternehmens - Michael Sigmund CFO Siemens Investitionsplanung Berlin, 26. November, 2009 #12;Page 2 November 26, 2009 Copyright Siemens AG 2009. All rights

  19. A new reef marine reserve in the

    E-Print Network [OSTI]

    A new reef marine reserve in the southern Arabian Gulf ­ Jebel Ali (Dubai, United Arab Emirates) Just in time to make a major contribution to IYOR, Dubai municipality (United Arab Emirates) declared

  20. Northeast Gasoline Supply Reserve | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    supplements the Northeast Home Heating Oil Reserve, a one million barrel supply of ultra-low sulfur diesel, which was used for the first time by first-responders and to fill...

  1. History of Heating Oil Reserve Releases

    Broader source: Energy.gov [DOE]

    The Northeast Home Heating Oil Reserve (NEHHOR), a one million barrel supply of ultra low sulfur distillate (diesel), was created to build a buffer to allow commercial companies to compensate for...

  2. CREATING THE NORTHEAST GASOLINE SUPPLY RESERVE

    Broader source: Energy.gov [DOE]

    In 2012, Superstorm Sandy made landfall in the northeastern United States and caused heavy damage to two refineries and left more than 40 terminals in New York Harbor closed due to water damage and loss of power. This left some New York gas stations without fuel for as long as 30 days. As part of the Obama Administrations ongoing response to the storm, the Department of Energy created the first federal regional refined product reserve, the Northeast Gasoline Supply Reserve.

  3. Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation

    E-Print Network [OSTI]

    Pennycook, Steve

    Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation Activities Setting Much of the work done under the Oak Ridge Operations (ORO) Office of Environmental, soil, groundwater, surface water, or other environmental media. Update This section will discuss the EM

  4. Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation

    E-Print Network [OSTI]

    Pennycook, Steve

    Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation Activities Setting Much of Environmental Management (EM) work done on the ORR is performed as a result, soil, groundwater, surface water, or other environmental media. Most of the remaining part of EM work

  5. Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation

    E-Print Network [OSTI]

    Pennycook, Steve

    Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation Activities Much of the work done under the DOE Oak Ridge Operations Office of Environmental Management (EM and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The 1992 Federal Facility

  6. Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation

    E-Print Network [OSTI]

    Pennycook, Steve

    Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation Activities Much of the work accomplished by the DOE Oak Ridge Office of Environmental Management (EM and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The 1992 Federal Facility

  7. Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation

    E-Print Network [OSTI]

    Pennycook, Steve

    Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation Activities Much of the work accomplished by the DOE Oak Ridge Office of Environmental Management (DOE- EM that remain in structures, buildings, facilities, soil, groundwater, surface water, or other environmental

  8. NREL Variability and Reserves Analysis for the Western Interconnect (Presentation)

    SciTech Connect (OSTI)

    Milligan, M.; King, J.

    2011-10-01T23:59:59.000Z

    Additional variability and uncertainty increase reserve requirements. In this light, this presentation discusses how use of generation reserves can be optimized for managing variability and uncertainty. Conclusions of this presentation are: (1) Provided a method for calculating additional reserve requirements due to wind and solar production; (2) Method is based on statistical analysis of historical time series data; (3) Reserves are dynamic, produced for each hour; (4) Reserve time series are calculated from and synchronized to simulation data; (5) PROMOD can not model directly, but workarounds exist for regulation and spin; and (6) Other production modeling packages have varying capability for reserves modeling.

  9. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  10. Biological assessment: possible impacts of exploratory drilling in sections 8B and 18H, Naval Petroleum Reserve No. 2, Kern County, California on the endangered San Joaquin kit fox, blunt-nosed leopard lizard, and other sensitive species

    SciTech Connect (OSTI)

    O'Farrell, T.P.; Sauls, M.L.

    1982-07-01T23:59:59.000Z

    The U.S. Department of Energy proposes to drill exploratory wells on two sections, 8B and 18H, within Naval Petroleum Reserve No. 2 in western Kern County, California. The proposed sites are thought to provide habitat for the endangered San Joaquin kit fox and blunt-nosed leopard lizard, as well as two sensitive species: the giant kangaroo rat and San Joaquin antelope ground squirrel. The objective was to assess the possible impacts of the exploratory drilling on these species and their essential habitats. Although 23 potential San Joaquin kit fox den sites were found during surveys of a total of 512 ha (1280 acres) surrounding both well sites, no burrows were closer than 30 m from proposed disturbance, and most were over 200 m away. Two blunt-nosed leopard lizards were observed on private land within 8B, one was observed on private land in 18H, and two were seen on DOE portions of 18H. No evidence of blunt-nosed leopard lizards was gathered in the immediate vicinity of either proposed well site. Although 5 ha of habitat will be disturbed, there is no evidence to indicate any of the species has burrows on-site that will be lost during land clearing. Loss of habitat will be mitigated during the cleanup and restoration phases when disturbed areas will be revegetated. Increased traffic, human activities, noise and ground vibration levels, as well as illumination throughout the night, may disturb the fauna. However, these species have adapted to intensive human disturbances on Elk Hills without obvious negative effects. The short duration of the project should allow any displaced animals to return to the sites after drilling ceases.

  11. Methamphetamine and Tribal Criminal Jurisdiction on the Wind River Reservation

    E-Print Network [OSTI]

    Cisneros, Mandy

    2008-06-18T23:59:59.000Z

    The drug methamphetamine is creating an epidemic on Tribal reservations. Non-Indian drug dealers are targeting vulnerable addicted populations, including the Wind River Reservation in Wyoming in hopes to replace the alcohol ...

  12. The value of United States oil and gas reserves

    E-Print Network [OSTI]

    Adelman, Morris Albert

    1996-01-01T23:59:59.000Z

    The object of this research is to estimate a time series, starting in 1979, for the value of in-ground oil reserves and natural gas reserves in the United States. Relatively good statistics exist for the physical quantities. ...

  13. air reserve base: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Dja reserve has not yet been subject to forest logging. But the high processing of timber extraction and the commercial hunting of large mammals around the reserve, result...

  14. abnormal coronary reserve: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Dja reserve has not yet been subject to forest logging. But the high processing of timber extraction and the commercial hunting of large mammals around the reserve, result...

  15. alveolar microvascular reserves: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Dja reserve has not yet been subject to forest logging. But the high processing of timber extraction and the commercial hunting of large mammals around the reserve, result...

  16. advance lightpath reservation: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Dja reserve has not yet been subject to forest logging. But the high processing of timber extraction and the commercial hunting of large mammals around the reserve, result...

  17. areas oak ridge reservation: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Dja reserve has not yet been subject to forest logging. But the high processing of timber extraction and the commercial hunting of large mammals around the reserve, result...

  18. Top 100 Operators: Proved Reserves and Production, Operated vs...

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    Top 100 Operators: Proved Reserves and Production, Operated vs Owned, 2009 1 Top 100 Operators: Proved Reserves and Production, Operated vs Owned, 2009 The operator of an oil or...

  19. additional reserve recovery: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Additive Loss Reserving for Dependent Lines of Business By Klaus D. Schmidt Lehrstuhl f models for loss reserving and study their impact on extensions of the additive method and...

  20. Five more spring nature walks planned on Oak Ridge Reservation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reservation. April 4's nature walk will feature frog calls and bat monitoring. Photo: W.K. Roy. An American toad captured in mid-croak on the Oak Ridge Reservation. April 4's...

  1. Draft 'Michigan Saves' Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    A sample loan loss reserve agreement between a state or local government and a financial institution setting the terms and conditions of the loan loss reserve fund. Author: State of Michigan

  2. Gulf of Mexico Proved Reserves By Water Depth, 2009

    Gasoline and Diesel Fuel Update (EIA)

    Gulf of Mexico Proved Reserves and Production by Water Depth, 2009 1 Gulf of Mexico Proved Reserves and Production by Water Depth The Gulf of Mexico Federal Offshore region (GOM...

  3. Dalhousie Libraries e-Reserves Service Library Readings in OWL

    E-Print Network [OSTI]

    Dellaire, Graham

    will look like this: #12;Dalhousie Libraries can Provide URLs to these Types of Electronic MaterialDalhousie Libraries e-Reserves Service Library Readings in OWL #12;Course Reserves Faculty now have 2 options for Reserve materials: NEW Option: Upload a course reading list and Library staff will

  4. RICSK All Rights Reserved, Copyright 2013 Riken, Japan.

    E-Print Network [OSTI]

    Fukai, Tomoki

    RICSK: HPCI 2013/7/30 RICSK All Rights Reserved, Copyright 2013 Riken, Japan. 1 2013/7/30 RICSK All Rights Reserved, Copyright 2013 Riken, Japan. 2 1. RICSK 30 2. RICSK 1 (:30) 3. RICSK1 RICS 2013/7/30 RICSK All Rights Reserved, Copyright 2013 Riken, Japan. 3 Simulation setting RICS Visio 3

  5. Alberta's Energy Reserves 2007 and Supply/Demand Outlook

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Alberta's Energy Reserves 2007 and Supply/Demand Outlook 2008-2017 0 ST98-2008 Energy Resources RESOURCES CONSERVATION BOARD ST98-2008: Alberta's Energy Reserves 2007 and Supply/Demand Outlook 2008: Reserves Andy Burrowes, Rick Marsh, Nehru Ramdin, and Curtis Evans; Supply/Demand and Economics

  6. West Hackberry Strategic Petroleum Reserve site brine-disposal monitoring, Year I report. Volume II. Physical and chemical oceanography. Final report

    SciTech Connect (OSTI)

    DeRouen, L.R.; Hann, R.W.; Casserly, D.M.; Giammona, C.; Lascara, V.J. (eds.)

    1983-02-01T23:59:59.000Z

    This project centers around the Strategic Petroleum Site (SPR) known as the West Hackberry salt dome which is located in southwestern Louisiana, and which is designed to store 241 million barrels of crude oil. Oil storage caverns are formed by injecting water into salt deposits, and pumping out the resulting brine. Studies described in this report were designed as follow-on studies to three months of pre-discharge characterization work, and include data collected during the first year of brine leaching operations. The objectives were to: (1) characterize the environment in terms of physical, chemical and biological attributes; (2) determine if significant adverse changes in ecosystem productivity and stability of the biological community are occurring as a result of brine discharge; and (3) determine the magnitude of any change observed. Contents of Volume II include: introduction; physical oceanography; estuarine hydrology and hydrography; analysis of discharge plume; and water and sediment quality.

  7. Kentucky Shale Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet)Wellhead PriceProved Reserves

  8. Texas Union Pizza Order Form ROOM RESERVED ______________________________________________________

    E-Print Network [OSTI]

    Jefferys, William

    : ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ Pick-up All orders are to be picked up at the Texas Union Hospitality Center desk in the south end West#12;#12;Texas Union Pizza Order Form ROOM RESERVED with the Texas Union Policies and Procedures. I understand that I will be held responsible for any debts incurred

  9. Determination of Optimal Electricity Reserve Requirements

    E-Print Network [OSTI]

    load demand forecast error, the wind production forecast error and the failures of the power plants of wind power production and power load demand 14 2.4.2 Mega Watts failed to avoid it is to allocate electricity reserves and use them to balance up the system if required

  10. Oak Ridge Reservation Waste Management Plan

    SciTech Connect (OSTI)

    Turner, J.W. [ed.

    1995-02-01T23:59:59.000Z

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  11. WELCOME TO THE ELECTRONIC RESERVES COURSE READINGS

    E-Print Network [OSTI]

    Shrader-Frechette, Kristin

    WELCOME TO THE ELECTRONIC RESERVES COURSE READINGS NOTE: THIS MATERIAL MAY BE PROTECTED-489 File # 020702008_Shrader #12;Science versus educated guessing - risk assessment, nuclear waste is irrational and ignorant in fearing risks such as permanent disposal of radioactive waste. In recent

  12. Revolving Loan Funds and Loan Loss Reserves

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) State Energy Program (SEP) guidance to states, Indian tribes, and overseas U.S. territories receiving SEP grants under the 209 Recovery Act dealing with loan loss reserves for revolving loan funds.

  13. VEHICLE RESERVATION DO NOT WRITE IN

    E-Print Network [OSTI]

    Kirschner, Denise

    VEHICLE RESERVATION DO NOT WRITE IN SHADED AREAS For Information Call 764-2485 FAX # (76)3-1470 Vehicle No. License OK VEHICLE DAMAGE INSPECTION Circle area of damage and/or describe below: OUTGOING for Rules & Regulations for Vehicle Rentals Reference Number 5 digit # Date Department Short code Requestor

  14. Fundamental Drivers of the Cost and Price of Operating Reserves

    SciTech Connect (OSTI)

    Hummon, M. R.; Denholm, P.; Jorgenson, J.; Palchak, D.; Kirby, B.; Ma, O.

    2013-07-01T23:59:59.000Z

    Operating reserves impose a cost on the electric power system by forcing system operators to keep partially loaded spinning generators available for responding to system contingencies variable demand. In many regions of the United States, thermal power plants provide a large fraction of the operating reserve requirement. Alternative sources of operating reserves, such as demand response and energy storage, may provide more efficient sources of these reserves. However, to estimate the potential value of these services, the cost of reserve services under various grid conditions must first be established. This analysis used a commercial grid simulation tool to evaluate the cost and price of several operating reserve services, including spinning contingency reserves and upward regulation reserves. These reserve products were evaluated in a utility system in the western United States, considering different system flexibilities, renewable energy penetration, and other sensitivities. The analysis demonstrates that the price of operating reserves depend highly on many assumptions regarding the operational flexibility of the generation fleet, including ramp rates and the fraction of fleet available to provide reserves.

  15. Advance Network Reservation and Provisioning for Science

    SciTech Connect (OSTI)

    Balman, Mehmet; Chaniotakis, Evangelos; Shoshani, Arie; Sim, Alex

    2009-07-10T23:59:59.000Z

    We are witnessing a new era that offers new opportunities to conduct scientific research with the help of recent advancements in computational and storage technologies. Computational intensive science spans multiple scientific domains, such as particle physics, climate modeling, and bio-informatics simulations. These large-scale applications necessitate collaborators to access very large data sets resulting from simulations performed in geographically distributed institutions. Furthermore, often scientific experimental facilities generate massive data sets that need to be transferred to validate the simulation data in remote collaborating sites. A major component needed to support these needs is the communication infrastructure which enables high performance visualization, large volume data analysis, and also provides access to computational resources. In order to provide high-speed on-demand data access between collaborating institutions, national governments support next generation research networks such as Internet 2 and ESnet (Energy Sciences Network). Delivering network-as-a-service that provides predictable performance, efficient resource utilization and better coordination between compute and storage resources is highly desirable. In this paper, we study network provisioning and advanced bandwidth reservation in ESnet for on-demand high performance data transfers. We present a novel approach for path finding in time-dependent transport networks with bandwidth guarantees. We plan to improve the current ESnet advance network reservation system, OSCARS [3], by presenting to the clients, the possible reservation options and alternatives for earliest completion time and shortest transfer duration. The Energy Sciences Network (ESnet) provides high bandwidth connections between research laboratories and academic institutions for data sharing and video/voice communication. The ESnet On-Demand Secure Circuits and Advance Reservation System (OSCARS) establishes guaranteed bandwidth of secure virtual circuits at a certain time, for a certain bandwidth and length of time. Though OSCARS operates within the ESnet, it also supplies end-to-end provisioning between multiple autonomous network domains. OSCARS gets reservation requests through a standard web service interface, and conducts a Quality-of-service (QoS) path for bandwidth guarantees. Multi-protocol Label Switching (MPLS) and the Resource Reservation Protocol (RSVP) enable to create a virtual circuit using Label Switched Paths (LSP's). It contains three main components: a reservation manager, a bandwidth scheduler, and a path setup subsystem. The bandwidth scheduler needs to have information about the current and future states of the network topology in order to accomplish end-to-end bandwidth guaranteed paths.

  16. Petroleum: An energy profile, 1999

    SciTech Connect (OSTI)

    NONE

    1999-07-01T23:59:59.000Z

    This report prepared by the Energy Information Administration covers the following topics: petroleum production and end-use sectors; resources and reserves; exploration and production; LPG sources and processing; motor gasoline octane enhancement; constructing pipelines; the strategic petroleum reserve; imports and exports; marketing; district descriptions and maps; and refinery processes and facilities. 33 figs., 7 tabs.

  17. Sandia National Laboratories: US Strategic Petroleum Reserve

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fuel and grid-scale energy applications offers several advantages over above-ground storage, says a recent Sandia study sponsored by the DOE Fuel Cell Technologies...

  18. Associate Deputy Assistant Secretary for Petroleum Reserves

    Broader source: Energy.gov [DOE]

    Do you have what it takes to be a part of the leadership team of a dynamic and multi-faceted organization responsible for providing energy security for America? The mission of the Office of...

  19. Categorical Exclusion Determinations: Strategic Petroleum Reserve Field

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergy BushCalifornia9HampshirePennsylvaniaDepartmentDepartment

  20. FE Petroleum Reserves News | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of Energy 088:EnergyFAR27.pdfFE DOCKET NO.Oil

  1. Strategic Petroleum Reserve Receives Prestigious Environmental Award |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO OverviewRepositoryManagementFacility inStatementDepartment ofDepartment of

  2. Naval Petroleum Reserves | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy:Nanowire Solar541,9337, 2011 at 2:00 P.M.

  3. Strategic Petroleum Reserve | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative JC3 RSS September 9,AwardGradsSites PendingAgreementsSteam

  4. Strategic Petroleum Reserve Receives Prestigious Environmental Award |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014,Zaleski -Blueprint | Department ofofCyber AwarenessFocus PointsDepartment

  5. New, improved equation solves for volatile oil, condensate reserves

    SciTech Connect (OSTI)

    Walsh, M.P. (Petroleum Recovery Research Inst., Austin, TX (United States))

    1994-08-22T23:59:59.000Z

    A new generalized material-balance equation (GMBE) can be applied to the full range of reservoir fluids, including volatile oil and gas condensate. The GMBE replaces the nearly 60-year-old conventional material-balance equation (CMBE). Material balance methods are routinely used by petroleum engineers to estimate reserves. The so-called straight-line methods are the most common. Two of the most popular are: P/z-plot for estimating gas reserves in a dry-gas reservoir; and Havlena and Odeh method for estimating original oil-in-place (N) and original gas-in-place (G) in a black-oil reservoir. A major shortcoming of these and other straight-line methods is that none apply to the full range of reservoir fluids and very few, if any, deal satisfactorily with volatile oil and rich gas condensate. Also, the limits of the methods are not well defined. As drilling goes deeper and more volatile oil and gas-condensate reservoirs are discovered, there is a growing need for a general straight-line method to estimate N and G. For the GMBE, no restrictions are placed on the initial fluid compositions.

  6. The Oak Ridge Reservation Annual Site Environmental Report Summary, 2007

    SciTech Connect (OSTI)

    None, None

    2009-02-28T23:59:59.000Z

    The Oak Ridge Reservation Annual Site Environmental Report is prepared and published each year to inform the public of the environmental activities that take place on the reservation and in the surrounding areas. It is written to comply with DOE Order 231.1A, Environment, Safety, and Health Reporting. This document has been prepared to present the highlights of the Oak Ridge Reservation Annual Site Environmental Report 2007 in an easy-to-read, summary format.

  7. Coal reserves in the United States and around the world

    SciTech Connect (OSTI)

    Jubert, K.; Masudi, H.

    1995-03-01T23:59:59.000Z

    There is an urgent need to examine the role that coal might play in meeting world energy needs during the next 20 years. Oil from the Organization of Petroleum Exporting Countries (OPEC) can no longer be relied upon to provide expanding supplies of energy, even with rapidly rising prices. Neither can nuclear energy be planned on for rapid expansion worldwide until present uncertainties about it are resolved. Yet, the world`s energy needs will continue to grow, even with vigorous energy conservation programs and with optimistic rates of expansion in the use of solar energy. Coal already supplies 25% of the world`s energy, its reserves are vast, and it is relatively inexpensive. This study, with the aid of reports from the World Coal Study (WOCOL) examines the needs for coal on a global scale, its availability past and present, and its future prospects.

  8. 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved.

    E-Print Network [OSTI]

    Zhang, Meirong

    © 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12;© 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12;© 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12;© 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved

  9. 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved.

    E-Print Network [OSTI]

    Qian, Weihong

    1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12; 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12; 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12; 1995-2004 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved

  10. 1995-2006 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. 1995-2006 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved.

    E-Print Network [OSTI]

    Zhang, Ke-Min

    © 1995-2006 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12;© 1995-2006 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12;© 1995-2006 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved. #12;© 1995-2006 Tsinghua Tongfang Optical Disc Co., Ltd. All rights reserved

  11. apache indian reservation: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    survival or death 1. However, these statistical methods are constrained Sudarshan, S. 2 Logging the Great Lakes Indian Reservations: The Case of the Bad River Environmental...

  12. atlantic forest reserve: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive Summary: An investigation of the effects of commercial mechanised selective logging on rain forest vegetation and mammals, was undertaken in the Lope Reserve, central...

  13. SolarReserve, LLC (Crescent Dunes) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    SolarReserve's 110 MW solar power tower that concentrates solar energy to heat molten salt, converting that heat into electricity. This project is the first commercial...

  14. Electricity demand as frequency controlled reserves, ENS (Smart...

    Open Energy Info (EERE)

    implementation, data analyses, etc., a technology will be developed in which the electricity consumption will be used as a frequencycontrolled reserve (DFR). References...

  15. Electricity demand as frequency controlled reserves, ForskEL...

    Open Energy Info (EERE)

    controlled reserve (DFR) implementation, a system that automatically stops or starts electricity consumption in response to system frequency variations. References "EU...

  16. Selection of bioclimatically representative biological reserve systems under climate change

    E-Print Network [OSTI]

    Pyke, C R; Fischer, Douglas T

    2005-01-01T23:59:59.000Z

    of bioclimatically representative biological reserve systemsthat are bioclimatically representative across a range ofa ?at line (i.e. a representative sample of current climate

  17. Draft Michigan SAVES Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    A sample LRF agreement between a grantee and an financial institution setting the terms and conditions of the loan loss reserve fund.

  18. Update Invalid Reservation Points for Transmission Service Requests...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Update: Invalid Reservation Points for Transmission Service...

  19. Socioeconomic profiles of native American communities: Duckwater Shoshone Reservation

    SciTech Connect (OSTI)

    Hamby, M. [Cultural Resources Consultants Ltd., Reno, NV (United States)

    1991-10-01T23:59:59.000Z

    This report presents socioeconomic aspects of Native Americans of the Duckwater Shoshone Reservation. A survey is included concerning their views on the proposed Yucca Mountain waste repository. (CBS)

  20. ,"New York Dry Natural Gas Reserves Extensions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Extensions (Billion Cubic Feet)",1,"Annual",2013 ,"Release...

  1. ,"New York Dry Natural Gas Reserves New Field Discoveries (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves New Field Discoveries (Billion Cubic Feet)",1,"Annual",2013...

  2. ,"New York Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet)",1,"Annual",2013 ,"Release...

  3. ,"New York Dry Natural Gas Reserves Estimated Production (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Estimated Production (Billion Cubic Feet)",1,"Annual",2013...

  4. ,"New York Dry Natural Gas Reserves Revision Decreases (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Revision Decreases (Billion Cubic Feet)",1,"Annual",2013...

  5. ,"New York Dry Natural Gas Reserves Sales (Billion Cubic Feet...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Sales (Billion Cubic Feet)",1,"Annual",2013 ,"Release...

  6. ,"New York Dry Natural Gas Reserves Adjustments (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Adjustments (Billion Cubic Feet)",1,"Annual",2013 ,"Release...

  7. ,"New York Dry Natural Gas Reserves Revision Increases (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New York Dry Natural Gas Reserves Revision Increases (Billion Cubic Feet)",1,"Annual",2013...

  8. NERSC Supercomputers Help Reveal Secrets of Natural Gas Reserves

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gas Reserves New structural information could yield more efficient extraction of gas and oil from shale December 3, 2013 | Tags: Basic Energy Sciences (BES), Materials Science,...

  9. 2013 American Geophysical Union. All Rights Reserved. High resolution imaging of the melt distribution in 1

    E-Print Network [OSTI]

    2013 American Geophysical Union. All Rights Reserved. High resolution imaging of the melt; 2013 American Geophysical Union. All Rights Reserved. Abstract We determine the 3-D melt geometry

  10. Demand Response Spinning Reserve Demonstration -- Phase 2 Findings from the Summer of 2008

    E-Print Network [OSTI]

    Eto, Joseph H.

    2010-01-01T23:59:59.000Z

    A. Barat, D. Watson. 2007. Demand Response Spinning ReserveN ATIONAL L ABORATORY Demand Response Spinning Reserveemployer. LBNL-XXXXX Demand Response Spinning Reserve

  11. Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect (OSTI)

    Not Available

    1994-10-01T23:59:59.000Z

    The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

  12. University Housing Facility Reservation Policy Revised June 2009

    E-Print Network [OSTI]

    Saldin, Dilano

    University Housing Facility Reservation Policy Revised June 2009 All reservations of University Housing facilities are regulated by the Program Services Center (PSC), located in Sandburg Halls Room C288-229-5343 or evntasst@uwm.edu Rates As an Auxiliary Service, University Housing facilities are completely funded

  13. A Grid Resource Broker Supporting Advance Reservations and

    E-Print Network [OSTI]

    Elmroth, Erik

    for resource selection. Based on the user's identification of relevant benchmarks and an estimated executionA Grid Resource Broker Supporting Advance Reservations and Benchmark-Based Resource Selection Erik of the resource manager include advance reservations, resource selection based on computer benchmark results

  14. Diagnosing Unilateral Market Power in Electricity Reserves Market

    E-Print Network [OSTI]

    Rothman, Daniel

    Diagnosing Unilateral Market Power in Electricity Reserves Market Christopher R. Knittel on the allocative ine ciencies of reserve markets in restructured electricity industries. One considerable barrier the investigation of the California electricity crisis of 2000 and 2001 by the Federal Energy Regulatory Commission

  15. Power Reserve Management by Two-Stage Stochastic Programming

    E-Print Network [OSTI]

    reserve management becomes important. Previous studies indicate that power optimization problems can of stochastic programming to a power reserve management problem. Very often power optimization problems involve considerable attention. Examples on hydro-thermal power production planning are [4], [6] and [9]. Both problems

  16. Oak Ridge Reservation environmental report for 1991

    SciTech Connect (OSTI)

    Mucke, P.C. (ed.)

    1992-10-01T23:59:59.000Z

    The first two volumes of this report present data and supporting narratives regarding the impact of the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) on its surrounding environs and the public during 1991. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the reader who does not want to review in detail all of the 1991 data for the ORR. This volume, Volume 2, includes the detailed data formats that ensure all the environmental data are represented. Narratives are not included. The information in Vol. 2 is addressed and analyzed in Vol. 1.

  17. Allocating Variability and Reserve Requirements (Presentation)

    SciTech Connect (OSTI)

    Kirby, B.; King, J.; Milligan, M.

    2011-10-01T23:59:59.000Z

    This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

  18. Arkansas Shale Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecade Year-0Proved Reserves (Billion Cubic Feet)

  19. Colorado Shale Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear21 3.96 1967-2010CubicProductionProved

  20. Michigan Shale Proved Reserves (Billion Cubic Feet)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade EnergyTennesseeYearUndergroundCubicDecadeFeet)Proved Reserves

  1. Federal Offshore, Pacific (California) Proved Nonproducing Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.Gas Proved Reserves, Wet AfterDec.Dec.12 12 13

  2. Wyoming Shale Proved Reserves (Billion Cubic Feet)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1(MillionExtensionsThousandUnderground Storage VolumeperProved Reserves

  3. Price Competitive Sale of Strategic Petroleum Reserve Petroleum; Standard

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO Overview OCHCODepartment ofRecipients | Department

  4. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R. (eds.)

    1990-10-01T23:59:59.000Z

    This two-volume report, the Oak Ridge Reservation Environmental Report for 1989, is the nineteenth in an annual series that began in 1971. It reports the results of a comprehensive, year-round program to monitor the impact of operations at the three major US Department of Energy (DOE) production and research installations in Oak Ridge on the immediate areas' and surrounding region's groundwater and surface waters, soil, air quality, vegetation and wildlife, and through these multiple and varied pathways, the resident human population. Information is presented for the environmental monitoring Quality Assurance (QA) Program, audits and reviews, waste management activities, land special environmental studies. Data are included for the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory (ORNL), and Oak Ridge Gaseous Diffusion Plant (ORGDP). Volume 1 presents narratives, summaries, and conclusions based on environmental monitoring at the three DOE installations and in the surrounding environs during calendar year (CY) 1989. Volume 1 is intended to be a stand-alone'' report about the Oak Ridge Reservation (ORR) for the reader who does not want an in-depth review of 1989 data. Volume 2 presents the detailed data from which these conclusions have been drawn and should be used in conjunction with Volume 1.

  5. Integrated reservoir management doubles Nigerian field reserves

    SciTech Connect (OSTI)

    Akinlawon, Y.; Nwosu, T.; Satter, A.; Jespersen, R.

    1996-10-01T23:59:59.000Z

    An integrated alliance across disciplines, companies and countries enabled Texaco to conduct a comprehensive reservoir analysis of the North Apoi/Funiwa field in Nigeria. Recommendations implemented in 3 months doubled the book reserves of this mature field. The paper discusses the objectives, the integration of organizations, reservoir analysis, and conclusions. The conclusions made from the integrated study are: (1) 3-D seismic data dramatically improved reservoir description. (2) OOIP is considerably more than the booked values and reserves additions are substantial. (3) Significant value has been added to TOPCON`s assets as a result of teamwork and a multidisciplinary approach to evaluating the reservoirs and optimizing the scenarios for reservoir management. (4) Teamwork and integration of professionals, data, technology and tools was critical to the projects success. (5) The study set an example for effective and expeditious technology transfer and applications. (6) Partnering of TOPCON, DPR, NAPIMS, EPTD and SSI resulted in a quick cycle time and set an excellent example of integration and alliance.

  6. ,"U.S. Coalbed Methane Proved Reserves, Reserves Changes, and Production"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: Energy Sources andPlant Liquids,+ LeasePrice SoldPlantGrossDistillateReserves

  7. Oak Ridge Reservation environmental report for 1989

    SciTech Connect (OSTI)

    Jacobs, V.A.; Wilson, A.R. (eds.)

    1990-10-01T23:59:59.000Z

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1989. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1989 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1. 16 figs., 194 tabs.

  8. Oak Ridge Reservation Environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R. (ed.)

    1991-09-01T23:59:59.000Z

    The first two volumes of this report are devoted to a presentation of environmental data and supporting narratives for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR) and surrounding environs during 1990. Volume 1 includes all narrative descriptions, summaries, and conclusions and is intended to be a stand-alone'' report for the ORR for the reader who does not want to review in detail all of the 1990 data. Volume 2 includes the detailed data summarized in a format to ensure that all environmental data are represented in the tables. Narratives are not included in Vol. 2. The tables in Vol. 2 are addressed in Vol. 1. For this reason, Vol. 2 cannot be considered a stand-alone report but is intended to be used in conjunction with Vol. 1.

  9. Petroleum Supply Monthly, June 1984. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1984-08-01T23:59:59.000Z

    This issue features a mid-year petroleum review. The article discusses changes in consumption, domestic crude oil production, exploration and development activity, refinery operations, foreign trade, stocks (including the Strategic Petroleum Reserve), and prices. A special summary of changes in petroleum imports is included. The Petroleum Supply Reporting System is reviewed.

  10. Loan Loss Reserve Fund Impacts on Standard Residential Underwriting Guidelines

    Broader source: Energy.gov [DOE]

    State and local governments can use loan loss reserve (LLR) funds to persuade lenders to offer more flexible terms during the underwriting process. The availability of an LLR can have the following...

  11. Evolution of Operating Reserve Determination in Wind Power Integration Studies

    SciTech Connect (OSTI)

    Ela, E.; Kirby, B.; Lannoye, E.; Milligan, M.; Flynn, D.; Zavadil, B.; O'Malley, M.

    2011-03-01T23:59:59.000Z

    This paper describes different assumptions and methods utilized to calculate the amount of different types of reserves carried, and how these methods have evolved as more studies have been performed.

  12. Wind Resource and Feasibility Assessment Report for the Lummi Reservation

    SciTech Connect (OSTI)

    DNV Renewables (USA) Inc.; J.C. Brennan & Associates, Inc.; Hamer Environmental L.P.

    2012-08-31T23:59:59.000Z

    This report summarizes the wind resource on the Lummi Indian Reservation (Washington State) and presents the methodology, assumptions, and final results of the wind energy development feasibility assessment, which included an assessment of biological impacts and noise impacts.

  13. Loan Loss Reserves: Lessons from the Field (Text Version)

    Broader source: Energy.gov [DOE]

    Merrian Fuller: Hi, and welcome to the Department of Energy's webinar on using loan-loss reserves report financing programs. My name is Marian Fuller, I work with Lawrence Berkeley National...

  14. Northeast Home Heating Oil Reserve- Online Bidding System

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy has developed an on-line bidding system - an anonymous auction program - for the sale of product from the one million barrel Northeast Home Heating Oil Reserve.

  15. The Oak Ridge Reservation Annual Site Environmental Report, 2007

    SciTech Connect (OSTI)

    none,

    2008-09-30T23:59:59.000Z

    The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservations role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, the use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at Http://www.ornl.gov/sci/env_rpt or from the project director.

  16. Criteria to determine gas reserves using short time buildup tests

    E-Print Network [OSTI]

    Guerini Franchina, Agostino

    1991-01-01T23:59:59.000Z

    (Member) Robert R. Berg (Member) Kenneth R. Hall (interim Head of Department) December 1991 ABSTRACT Criteria to Determine Gas Reserves Using Short Time Buildup Tests. ( December 1991 ) Agostino Guerini Franchina, Ingeniero de Petroleo...

  17. Renewable Energy Development on Fort Mojave Reservation Feasiblity Study

    SciTech Connect (OSTI)

    Russell Gum, ERCC analytics LLC

    2008-03-17T23:59:59.000Z

    The Ft. Mojave tribe, whose reservation is located along the Colorado River in the states of Arizona, California, and Nevada near the point where all three states meet, has a need for increased energy supplies. This need is a direct result of the aggressive and successful economic development projects undertaken by the tribe in the last decade. While it is possible to contract for additional energy supplies from fossil fuel sources it was the desire of the tribal power company, AHA MACAV Power Service (AMPS) to investigate the feasibility and desirability of producing power from renewable sources as an alternative to increased purchase of fossil fuel generated power and as a possible enterprise to export green power. Renewable energy generated on the reservation would serve to reduce the energy dependence of the tribal enterprises on off reservation sources of energy and if produced in excess of reservation needs, add a new enterprise to the current mix of economic activities on the reservation. Renewable energy development would also demonstrate the tribes support for improving environmental quality, sustainability, and energy independence both on the reservation and for the larger community.

  18. U.S. Lease Condensate Proved Reserves, Reserve Changes, and Production

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content API GravityDakota" "Fuel, quality",Area: U.S. East Coast (PADD 1) New EnglandReserves (BillionImport Area:,433 1,633

  19. Oak Ridge Reservation environmental report for 1990

    SciTech Connect (OSTI)

    Wilson, A.R. (ed.)

    1991-09-01T23:59:59.000Z

    The purpose of this report is to provide information to the public about the impact of the US Department of Energy's (DOE's) facilities located on the Oak Ridge Reservation (ORR) on the public and the environment. It describes the environmental surveillance and monitoring activities conducted at and around the DOE facilities operated by Martin Marietta Energy Systems, Inc. Preparation and publication of this report is in accordance with DOE Order 5400.1. The order specifies a publication deadline of June of the following year for each calendar year of data. The primary objective of this report is to summarize all information collected for the previous calendar year regarding effluent monitoring, environmental surveillance, and estimates of radiation and chemical dose to the surrounding population. When multiple years of information are available for a program, trends are also evaluated. The first seven sections of Volume 1 of this report address this objective. The last three sections of Volume 1 provide information on solid waste management, special environmental studies, and quality assurance programs.

  20. Nigeria steps up action to define and increase its oil reserves

    SciTech Connect (OSTI)

    Page, N.

    1992-01-06T23:59:59.000Z

    This paper reports that within the past 18 months, the Nigerian Ministry of Petroleum Resources has moved aggressively to increase investment in known producing areas and stimulate exploration in frontier regions in order to define and expand the country's reserve base for the start of the 21st century. At industry seminars held in November and December 1991 in Houston, London, and Lagos, the Ministry in association with TGSI-Mabon Geophysical Co. reviewed the Nigerian political and economic climate, recent industry development and leasing activity, deep-water geology and exploration potential, and the probable areas' terms and conditions for a new bidding round to be announced in early 1992.

  1. 2013 American Geophysical Union. All Rights Reserved. The 2010 California Research at the Nexus of Air Quality and Climate Change

    E-Print Network [OSTI]

    Cohen, Ronald C.

    2013 American Geophysical Union. All Rights Reserved. The 2010 California Research at the Nexus.50331 AcceptedArticle #12; 2013 American Geophysical Union. All Rights Reserved. Abstract

  2. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4: July--September 1996

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    This report presents significant accomplishments for the Oak Ridge Reservation`s environmental restoration projects for the fourth quarter of FY 1996.

  3. Biosphere reserves in action: Case studies of the American experience

    SciTech Connect (OSTI)

    None

    1995-06-26T23:59:59.000Z

    For nearly 20 years, biosphere reserves have offered a unique framework for building the knowledge, skills, and attitudes required for conservation and sustainable use of ecosystems. The 12 case studies in this volume chronicle many of the cooperative efforts to implement the biosphere reserve concept in the United States. Considered together, these efforts involve more than 20 types of protected areas, and the participation of all levels of government, and many private organizations, academic institutions, citizens groups, and individuals. Biosphere reserves are multi-purpose areas that are nominated by the national committee of the Man and the Biosphere Program (MAB) and designated by the United Nations Educational, Scientific and Cultural Organization (UNESCO) to serve as demonstration areas for cooperation in building harmonious relationships between human activities and the conservation of ecosystems and biological diversity. Each biosphere reserve exemplifies the characteristic ecosystems of one of the worlds biogeographical regions. It is a land or coas%arine area involving human communities as integral components and including resources managed for objectives ranging from complete protection to intensive, yet sustainable development. A biosphere reserve is envisioned as a regional ''landscape for learning'' in which monitoring, research, education, and training are encouraged to support sustainable conservation of natural and managed ecosystems. It is a framework for regional cooperation involving government decisionmakers, scientists, resource managers, private organizations and local people (i.e., the biosphere reserve ''stakeholders''). Finally, each biosphere reserve is part of a global network for sharing information and experience to help address complex problems of conservation and development. The 12 case studies presented in this report represent only a few of the possible evolutions of a biosphere reserve in its efforts to reach out to the local and regional community. As you have read, some have had great success, while others consider their successes almost negligible. All document tremendous effort from many people to improve the communication among landowners, land managers, scientists, and any others interested in the health and well-being of the natural and human environment of the biosphere reserve.

  4. Software & Services Group Developer Products Division Copyright 2011, Intel Corporation. All rights reserved.

    E-Print Network [OSTI]

    California at Berkeley, University of

    Software & Services Group Developer Products Division Copyright 2011, Intel Corporation. All & Services Group Developer Products Division Copyright 2011, Intel Corporation. All rights reserved. *Other Division Copyright 2011, Intel Corporation. All rights reserved. *Other brands and names are the property

  5. alam-pedja nature reserve: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Dja reserve has not yet been subject to forest logging. But the high processing of timber extraction and the commercial hunting of large mammals around the reserve, result...

  6. Introduction Coordinated Aggregation Resource Scheduling Reserve Scheduling Coordinated Aggregation of Distributed

    E-Print Network [OSTI]

    Resource Scheduling Reserve Scheduling Power Balance Available power g(t) - Bulk power B - Load Aggregation Resource Scheduling Reserve Scheduling Power Balance ... !" #$%&"'()*+" " ,*-*+.*-" " ,*/*)01" devil is in the details what variability? - variability in wind or rooftop solar? - what time scales

  7. New Geothermal Data System Could Open Up Clean-Energy Reserves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data System Could Open Up Clean-Energy Reserves New Geothermal Data System Could Open Up Clean-Energy Reserves February 25, 2013 - 2:28pm Addthis New geothermal data could open up...

  8. Application of the Continuous EUR Method to Estimate Reserves in Unconventional Gas Reservoirs

    E-Print Network [OSTI]

    Currie, Stephanie M.

    2010-10-12T23:59:59.000Z

    Reserves estimation in unconventional (low/ultra-low permeability) reservoirs has become a topic of increased interest as more of these resources are being developed, especially in North America. The estimation of reserves ...

  9. How can we build an oil reserve without offending the Saudis

    SciTech Connect (OSTI)

    Madison, C.

    1980-06-28T23:59:59.000Z

    Congress has ordered the Department of Energy to resume filling the strategic oil reserves at about the same 100,000 barrels of crude oil a day as the government fields at Elk Hills, California produce. Pressure to increase this amount while a world surplus exists will be strong, even though members of the Organization of Petroleum Exporting Countries (OPEC) have threatened to reduce their production if the US takes such action. The concept of a strategic reserve of 750 million barrels (a 90-day supply) first emerged as a way to separate foreign-policy decisions from foreign-oil supplies. The present level of 92 million barrels (12-13-days imports), however, has made the reserve a political issue. Delays were caused by a combination of site problems, budget cuts, market disruptions, and policy changes. The debate centers on timing - when the US should return to the market to continue filling the storage sites. US relations with Saudi Arabia are sensitive to Middle East peace agreements, the security of Saudi Arabian territory, and the security of Saudi Arabian production levels. The foreign-policy implications and their severity are disputed. (DCK)

  10. Recoverable natural gas reserves from Jurassic Norphlet Formation, Alabama coastal waters

    SciTech Connect (OSTI)

    Mancini, E.A.; Mink, R.M.; Bearden, B.L.; Hamilton, R.P.

    1987-09-01T23:59:59.000Z

    To date, 11 Norphlet gas fields have been established in offshore Alabama. These fields are part of a deep Jurassic gas trend that extends across southern Mississippi and Alabama into the Gulf of Mexico. Recoverable gas reserves of 4.9-8.1 tcf are estimated for the Norphlet Formation in Alabama's coastal waters. Proven gas reserves are estimated to be 3.7-4.6 tcf and potential reserves are estimated to be 1.2-3.5 tcf. The natural gas is trapped in a series of generally east-west-trending salt anticlines. The mechanism of structure formation appears to be salt flowage that has formed broad, low-relief anticlines, most of which are faulted, and many of which are related to small-scale growth faults. Salt movement is the critical factor in the formation of these petroleum traps. The primary Norphlet reservoir lithofacies are eolian dune and interdune sandstones that range in thickness from 140 to over 600 ft in Alabama's coastal waters. Gas pay can exceed 280 ft in thickness. Porosity is principally secondary, developed as a result of decementation and grain dissolution. Jurassic Smackover algal carbonate mudstones were the main source for the Norphlet hydrocarbons. The seal for the gas is the nonpermeable upper portion of the Norphlet Formation. The overlying lower Smackover carbonates are also nonpermeable and may serve as part of the seal.

  11. Multicell Li/SOCl/sub 2/ reserve battery

    SciTech Connect (OSTI)

    Baldwin, A.R.; Garoutte, K.F.

    1984-01-01T23:59:59.000Z

    Recent development work on reserve lithium thionyl chloride (RLTC) batteries at SNLA and Honeywell has included safety and performance evaluations. The RLTC battery is being considered for applications that have traditionally been fulfilled by state-of-the-art thermal batteries and reserve silver oxide zinc electrochemical systems. These applications typically demand a reserve battery having a rapid voltage rise, high reliability, operational safety and useful active lifetime ranging from minutes to hours. The RLTC work reported here was directed toward a power battery capable of meeting or exceeding the design requirements. Performance and safety test data indicate that the RLTC battery may be better suited than thermal batteries for some long-life applications. Table II presents a comparison between a Li(Si)/FeS/sub 2/ thermal battery and an RLTC battery, both of which were designed to fulfill the requirements.

  12. Markets slow to develop for Niger delta gas reserves

    SciTech Connect (OSTI)

    Thomas, D. [Thomas and Associates, Hastings (United Kingdom)

    1995-11-27T23:59:59.000Z

    Nigeria produces a very high quality, light, sweet crude oil but with a large percentage of associated gas derived from a high gas-to-oil ratio. Official proved gas reserves, both associated and nonassociated, are 120 tcf. Proved and probable reserves are estimated as high as 300 tcf. The internal market for gas has only begun to develop since the 1980s, and as a result approximately 77% of associated gas production is flared. Domestic gas consumption is currently approximately 700 MMcfd and is projected to have a medium term potential of 1.450 bcfd. The article discusses resource development, gas markets, gas flaring, gas use programs, the Bonny LNG scheme, the gas reserve base, LNG project status, competition, and energy opportunities.

  13. A NON-PARAMETRIC ESTIMATOR FOR RESERVE PRICES IN PROCUREMENT AUCTIONS

    E-Print Network [OSTI]

    Cengarle, María Victoria

    in implementing the optimal reserve price is the use of unobservables such as the distribution of supplier's costsA NON-PARAMETRIC ESTIMATOR FOR RESERVE PRICES IN PROCUREMENT AUCTIONS MARTIN BICHLER and JAYANT estimation of the bid distributions and the possibility to derive optimal reserve prices. In this paper we

  14. Copyright 2004 Auto-ID Labs, All Rights Reserved The Auto-ID Labs

    E-Print Network [OSTI]

    Brock, David

    Reserved Several Types of Webs The Web of Information HTML and the World Wide Web The Web of Things-ID Labs, All Rights Reserved A Special Word of Thanks to my Colleagues Stuart J. Allen - Professor Reserved A Special Word of Thanks to my Colleagues (continued) Nhat-So Lam Family Retail Business

  15. Indian Reservations in Kansas and the Extinguishment of Their Title

    E-Print Network [OSTI]

    Abel, Annie Heloise

    1900-01-01T23:59:59.000Z

    of 1802.*f Her construction of that document was not consistent with the facts in the case; for the federal government had not promised to expel the In dians from Georgia, but only to extinguish their title within the reserved limits of the state " a...^ C i^J j ) INDIAN RESERVATIONS IN KANSAS ANI^EHE EXTINGUISHMENT OF THEIR TITLE. Thesis prepared in partial fulfilment of the requirement of the University of Kanowwfey ^ w degree of master of arts, by A N N A H B L O I S B A B E L , * of Salina...

  16. Utah Natural Gas Plant Liquids, Reserves Based Production (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion Cubic Feet)Year Jan FebFeet)ReservesYear JanReserves Based

  17. Northern Cheyenne Reservation Coal Bed Natural Resource Assessment and Analysis of Produced Water Disposal Options

    SciTech Connect (OSTI)

    Shaochang Wo; David A. Lopez; Jason Whiteman Sr.; Bruce A. Reynolds

    2004-07-01T23:59:59.000Z

    Coalbed methane (CBM) development in the Powder River Basin (PRB) is currently one of the most active gas plays in the United States. Monthly production in 2002 reached about 26 BCF in the Wyoming portion of the basin. Coalbed methane reserves for the Wyoming portion of the basin are approximately 25 trillion cubic feet (TCF). Although coal beds in the Powder River Basin extend well into Montana, including the area of the Northern Cheyenne Indian Reservation, the only CBM development in Montana is the CX Field, operated by the Fidelity Exploration, near the Wyoming border. The Northern Cheyenne Reservation is located on the northwest flank of the PRB in Montana with a total land of 445,000 acres. The Reservation consists of five districts, Lame Deer, Busby, Ashland, Birney, and Muddy Cluster and has a population of 4,470 according to the 2000 Census. The CBM resource represents a significant potential asset to the Northern Cheyenne Indian Tribe. Methane gas in coal beds is trapped by hydrodynamic pressure. Because the production of CBM involves the dewatering of coalbed to allow the release of methane gas from the coal matrix, the relatively large volume of the co-produced water and its potential environmental impacts are the primary concerns for the Tribe. Presented in this report is a study conducted by the Idaho National Engineering and Environmental Laboratory (INEEL) and the Montana Bureau of Mines and Geology (MBMG) in partnership with the Northern Cheyenne Tribe to assess the Tribes CBM resources and evaluate applicable water handling options. The project was supported by the U.S. Department of Energy (DOE) through the Native American Initiative of the National Petroleum Technology Office, under contract DEAC07- 99ID13727. Matching funds were granted by the MBMG in supporting the work of geologic study and mapping conducted at MBMG.

  18. Reserve asset values and the "hotelling valuation principle"

    E-Print Network [OSTI]

    Adelman, Morris Albert

    1992-01-01T23:59:59.000Z

    The Hotelling Valuation Principle, that the in-situ value of a mineral unit equals the current net price, is a special case of a more general relation. Tested against a set of recent Canadian sales of oil and gas reserves, ...

  19. Oak Ridge Reservation, annual site environmental report for 1993

    SciTech Connect (OSTI)

    Not Available

    1994-11-01T23:59:59.000Z

    The US DOE currently oversees activities on the Oak Ridge Reservation, a government-owned, contractor-operated facility. Three sites compose the reservation; Y-12, Oak Ridge National Laboratory, and K-25. This document contains a summary of environmental monitoring activities on the Oak Ridge Reservation (ORR) and its surroundings. The results summarized in this report are based on the data collected during calendar year (CY) 1993 and compiled in; Environmental Monitoring in the Oak Ridge Reservation: CY 1993 Results. Annual environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring is the collection and analysis of samples or measurements of liquid, gaseous, or airborne effluents for the purpose of characterizing and quantifying contaminants and process stream characteristics, assessing radiation and chemical exposures to members of the public, and demonstrating compliance with applicable standards. Environmental surveillance is the collection and analysis of samples of air, water, soil, foodstuffs, biota, and other media from DOE sites and their environs and the measurement of external radiation for purposes of demonstrating compliance with applicable standards, assessing radiation and chemical exposures to members of the public, and assessing effects, if any, on the local environment.

  20. Copyright c 2006 by Sebastian Carron Montero All rights reserved

    E-Print Network [OSTI]

    Quigg, Chris

    Copyright c 2006 by Sebastian Carron Montero All rights reserved #12;MEASUREMENT OF THE tt, WW AND Z PRODUCTION CROSS SECTIONS IN pp COLLISIONS AT s = 1.96 TeV by Sebastian Carron Monterop COLLISIONS AT s = 1.96 TeV by Sebastian Carron Montero Department of Physics Duke University Date: Approved

  1. Oak Ridge Reservation Annual Site environmental report for 1994

    SciTech Connect (OSTI)

    Koncinski, W.S. [ed.] [Oak Ridge National Lab., TN (United States)

    1995-10-01T23:59:59.000Z

    This report presents the details of the environmental monitoring and management plan for the Oak Ridge Reservation. Topics include: site and operations overview; environmental compliance strategies; environmental management program; effluent monitoring; environmental surveillance; radiation doses; chemical doses; ground water; and quality assurance.

  2. Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service

    SciTech Connect (OSTI)

    Ela, E.; Milligan, M.; Kirby, B.; Tuohy, A.; Brooks, D.

    2012-03-01T23:59:59.000Z

    Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. Frequency responsive reserve arrests the frequency decline resulting in the stabilization of system frequency, and avoids the triggering of under-frequency load-shedding or the reaching of unstable frequencies that could ultimately lead to system blackouts. It is a crucial service required to maintain a reliable and secure power system. Regions with restructured electricity markets have historically had a lack of incentives for frequency responsive reserve because generators inherently provided the response and on large interconnected systems, more than sufficient response has been available. This may not be the case in future systems due to new technologies and declining response. This paper discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.

  3. Copyright 2008 American Scientific Publishers All rights reserved

    E-Print Network [OSTI]

    . Khizroev4 1 Center for 3D Electronics, Department of Electrical Engineering, University of CaliforniaREVIEW Copyright © 2008 American Scientific Publishers All rights reserved Printed in the United not only magnetic but also thermal energy. For this reason the recording media with the substantially

  4. 2012 Portland General Electric. All rights reserved. Planning for Demand

    E-Print Network [OSTI]

    2/13/2013 1 © 2012 Portland General Electric. All rights reserved. Planning for Demand Response Balance: Energy #12;2/13/2013 2 3 PGE Load ­ Resource Balance: Winter Capacity 4 Traditional Role decade, access to a material portion of its legacy hydro resources. Meanwhile, PGE (and other IOU

  5. Predicting Market-Volatility from Federal Reserve Board Meeting Minutes

    E-Print Network [OSTI]

    Gordon, Geoffrey J.

    been applied to predict intra-day stock market returns, e.g. by (Pui Cheong Fung et al., 2003Predicting Market-Volatility from Federal Reserve Board Meeting Minutes NLP for Finance Reza Bosagh Zadeh, Andreas Zollmann 1 Introduction Predicting markets has always had a certain appeal to researchers

  6. The world's offshore continental margins contain vast reserves of

    E-Print Network [OSTI]

    Texas at Austin, University of

    The world's offshore continental margins contain vast reserves of gas hydrate, a frozen form of nat-seafloor geology. Increasing use of marine multicomponent seismic technol- ogy by oil and gas companies now allows seafloor strata over distances of several kilometers across the Green Canyon area of the Gulf of Mexico

  7. Illinois coal reserve assessment and database development. Final report

    SciTech Connect (OSTI)

    Treworgy, C.G.; Prussen, E.I.; Justice, M.A.; Chenoweth, C.A. [and others

    1997-11-01T23:59:59.000Z

    The new demonstrated reserve base estimate of coal of Illinois is 105 billion short tons. This estimate is an increase from the 78 billion tons in the Energy Information Administration`s demonstrated reserve base of coal, as of January 1, 1994. The new estimate arises from revised resource calculations based on recent mapping in a number of countries, as well as significant adjustments for depletion due to past mining. The new estimate for identified resources is 199 billion tons, a revision of the previous estimate of 181 billion tons. The new estimates incorporate the available analyses of sulfur, heat content, and rank group appropriate for characterizing the remaining coal resources in Illinois. Coal-quality data were examined in conjunction with coal resource mapping. Analyses of samples from exploration drill holes, channel samples from mines and outcrops, and geologic trends were compiled and mapped to allocate coal resource quantities to ranges of sulfur, heat content, and rank group. The new allocations place almost 1% of the demonstrated reserve base of Illinois in the two lowest sulfur categories, in contrast to none in the previous allocation used by the Energy Information Administration (EIA). The new allocations also place 89% of the demonstrated reserve base in the highest sulfur category, in contrast to the previous allocation of 69% in the highest category.

  8. Top 50 Textbook Reserves List University Libraries, Fall 2014

    E-Print Network [OSTI]

    Gruner, Daniel S.

    Top 50 Textbook Reserves List University Libraries, Fall 2014 Alphabetical By Course Ask for the books at the McKeldin Library Services Desk! [Note to staff: Call # is course code and beginning Project Management (6th ed) 9781285068374 ENES 210 FCH1 Pratt/Green Entrepreneurial Strategic Decision

  9. 110TH CONGRESS REPORT " !HOUSE OF REPRESENTATIVES1st Session 110185

    E-Print Network [OSTI]

    Petroleum and Oil Shale Reserves ......................................... 19 75 Strategic Petroleum Reserve

  10. 2008 Macmillan Publishers Limited. All rights reserved. 2008 Macmillan Publishers Limited. All rights reserved. High sensitivity of peat decomposition

    E-Print Network [OSTI]

    Moorcroft, Paul R.

    rights reserved. LETTERS High sensitivity of peat decomposition to climate change through water of the high water-holding capacity of peat and its low hydraulic conductivity, accumulation of soil organicbiogeochemical soil model with peat depths that are continuously updated from the dynamic balance of soil organic

  11. Peru: Illegal Mahogany Logging Continues in Reserve for Uncontacted Tribes Widespread illegal mahogany logging continues inside Peru's Muruanahua Territorial Reserve

    E-Print Network [OSTI]

    Peru: Illegal Mahogany Logging Continues in Reserve for Uncontacted Tribes Widespread illegal, indicating the settlement continues to be used as a transport center for mahogany illegally removed from and Park, loggers cut the trees into large boards with chainsaws. Because chainsawing mahogany is illegal

  12. Natural Areas Analysis and Evaluation: Oak Ridge Reservation

    SciTech Connect (OSTI)

    Baranski, Micahel J [self

    2009-11-01T23:59:59.000Z

    EXECUTIVE SUMMARY The Oak Ridge Reservation, encompassing 33,639 acres in the Valley and Ridge Physiographic Province of East Tennessee, has long been known for its unfragmented forests and high biodiversity. Many areas on the Reservation have been recognized as important natural areas, but no comprehensive treatment has been performed to evaluate the relative significance and importance of these areas compared to each other. The present study was conducted to develop a set of guidelines for evaluating the natural value of specific areas, to evaluate all the terrestrial areas that are currently delineated, and to rank all areas according to their relative biodiversity importance. All available data, reports and site-specific information relevant to Reservation lands, including Tennessee Division of Natural Areas database information, were evaluated and field work was conducted. Methodologies and criteria for assessment and evaluation of areas were developed; categories of criteria were devised; and a ranking system for evaluation of natural areas was produced. There were 70 areas evaluated during the study. The system is flexible, dynamic and easily revised to reflect updated and new information and interpretations. Eight categories of evaluation factors were established and used to characterize each site. These were the following: size of area, number or status taxa present, number of Endangered and Threatened taxa present, rarity of the Endangered and Threatened taxa on the Reservation, community diversity, site integrity and quality, disturbance and threat levels, and other significant features and factors. Each category generally consisted of a 5-point ranking scale from 0-4, allowing for a possible composite score of 32, with higher ranked, more important, sites attaining higher scores. Highly ranked sites are representative of regional natural diversity; contain outstanding natural features, communities or geology and/or very rare taxa or other elements; are relatively large in size with mature or old-growth community composition; lack current disturbance factors or potential threats and disturbances; are in excellent condition with good buffers; are places where ecological and evolutionary processes can occur relatively unaffected by humans; and can be reasonably defended and maintained as natural areas in an undeveloped condition. Highly ranked sites are the most significant and should receive the greatest protections. Composite scores of the ranked areas ranged from 1-25.5, with a mean score of 12. The ranked areas were divided into three Priority Groups. Group I, the most highly ranked group, included 20 sites and covered 5189 acres or 15.4% of Reservation lands; Group II included 31 sites and covered 4108 acres; Group III included 19 sites covering 400 acres of Reservation lands. All sites together comprise 9697 acres or 28.8% of Reservation lands. Six sites emerged as clearly the most significant natural areas on the Reservation. The study developed a number of recommendations that should be implemented in order to enhance and refine the natural areas data for the Reservation. There is a clear need for better and standardized ecological community classification and identification. Several areas are proposed for merger into larger units, and some new areas are proposed for inclusion and recognition in a natural areas system. Various gaps and discrepancies in the existing data are described and should be corrected. Other recommendations are made, including the development of a corollary system that can accommodate aquatic natural areas. The study relied primarily on the synthesis of information from many sources and from limited reconnaissance and direct observation during field work to produce a methodology for assessing natural area importance and assigning priorities for protection. Many instances of incomplete, missing or conflicting information made it difficult to complete thorough analysis. Further review and discussion among natural resources personnel will likely reveal possibilities for refinement and

  13. Aquatic Natural Areas Analysis and Evaluation: Oak Ridge Reservation

    SciTech Connect (OSTI)

    Baranski, Dr. Michael J. [Catawba College

    2011-04-01T23:59:59.000Z

    This report presents an assessment of the natural area value of eight Aquatic Natural Areas (ANAs) and seven Aquatic Reference Areas (ARAs) on the Oak Ridge Reservation (ORR) in Anderson and Roane Counties in east Tennessee. It follows a previous study in 2009 that analyzed and evaluated terrestrial natural areas on the Reservation. The purpose of both studies was to evaluate and rank those specially designated areas on the Reservation that contain sensitive species, special habitats, and natural area value. Natural areas receive special protections through established statutes, regulations, and policies. The ORR contains 33,542 acres (13,574 ha) administered by the Department of Energy. The surface waters of the Reservation range from 1st-order to 5th-order streams, but the majority of the streams recognized as ANAs and ARAs are 1st- and 2nd-order streams. East Fork Poplar Creek is a 4th-order stream and the largest watershed that drains Reservation lands. All the waters of the Reservation eventually reach the Clinch River on the southern and western boundaries of the ORR. All available information was collected, synthesized, and evaluated. Field observations were made to support and supplement the available information. Geographic information system mapping techniques were used to develop several quantitative attributes about the study areas. Narrative descriptions of each ANA and ARA and tables of numerical data were prepared. Criteria for assessment and evaluation were developed, and eight categories of factors were devised to produce a ranking system. The evaluation factors used in the ranking system were: (A) size of area, (B) percentage of watershed protected, (C) taxa present with protected status, (D) overall biotic diversity, (E) stream features, (F) water quality and use support ratings, (G) disturbance regime, and (H) other factors. Each factor was evaluated on a 5-point ranking scale (0-4), and each area received a composite score, where 32 was the maximum score possible. A highly ranked ANA or ARA is one that is large in size compared to other areas, includes a greater proportion of the watershed within Reservation boundaries, contains a number of status taxa at high densities, exhibits a high overall biodiversity, has very good or excellent habitat and water quality, is well protected and isolated from disturbances, and shows several other characteristics that contribute to natural area value. In this report, the term 'natural area' is loosely defined as a terrestrial or aquatic system that exhibits, or is thought to exhibit, high natural integrity and other significant natural values. The purpose of the present study is to evaluate and rank the currently recognized Aquatic Natural Areas (ANAs) and Aquatic Reference Areas (ARAs) on the Oak Ridge Reservation (ORR) for their natural area value. A previous study (Baranski 2009) analyzed, evaluated, and ranked terrestrial areas (Natural Areas [NAs], Reference Areas [RAs], and Cooperative Management Areas [CMAs]) on the ORR for natural area value, and a precise methodology for natural area evaluation was developed. The present study is intended to be a complement and companion to the terrestrial area study and attempts to employ a similar methodology for aquatic areas so that aquatic and terrestrial areas can be compared on a similar scale. This study specifically develops criteria for assessing the ecological, biodiversity, and natural area importance and significance of aquatic systems on the Reservation in a relevant and consistent manner. The information can be integrated into the Tennessee Natural Heritage Program (http://tn.gov/environment/na/nhp.shtml) system and applied to potential new aquatic areas. Further, the information will be useful in planning, management, and protection efforts on the ORR.

  14. Finding new reserves of oil and gas As the world's reserves of oil and gas become exhausted, we urgently need to find new

    E-Print Network [OSTI]

    Anderson, Jim

    Finding new reserves of oil and gas As the world's reserves of oil and gas become exhausted, we urgently need to find new fields to answer our energy needs. Oil companies are keen to use novel techniques) techniques represent arguably the most significant technological advance in the field of oil exploration

  15. 1. Check Equipment Reservations in Coral to ensure that you reserved the correct machine, in the correct facility, for the correct date. Another user may

    E-Print Network [OSTI]

    Reif, Rafael

    1. Check Equipment Reservations in Coral to ensure that you reserved the correct machine to honor them, if this is the case. 2. Engage the tool in Coral for the equipment that you are about to use protectors and acid gloves. 5. Perform pre-check of wet bench 1. Check the Coral indicator LED in the upper

  16. West Hackberry Strategic Petroleum Reserve site brine disposal monitoring, Year I report. Volume V. Supporting data for estuarine hydrology, discharge plume analysis, chemical oceanography, biological oceanography, and data management. Final report

    SciTech Connect (OSTI)

    DeRouen, L.R.; Hann, R.W.; Casserly, D.M.; Giammona, C.; Lascara, V.J. (eds.)

    1983-02-01T23:59:59.000Z

    This project centers around the Strategic Petroleum Site (SPR) known as the West Hackberry salt dome which located in southwestern Louisiana, and which is designed to store 241 million barrels of crude oil. Oil storage caverns are formed by injecting water into salt deposits, and pumping out the resulting brine. Studies described in this report were designed as follow-on studies to three months of pre-discharge characterization work, and include data collected during the first year of brine leaching operations. The objectives were to: (1) characterize the environment in terms of physical, chemical and biological attributes; (2) determine if significant adverse changes in ecosystem productivity and stability of the biological community are occurring as a result of brine discharge; and (3) determine the magnitude of any change observed. Volume V contains appendices for the following: supporting data for estuarine hydrology and hydrography; supporting data analysis of discharge plume; supporting data for water and sediment chemistry; CTD/DO and pH profiles during biological monitoring; supporting data for nekton; and supporting data for data management.

  17. Oak Ridge Reservation annual site environmental report for 1996

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The US Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. Three sites compose the reservation: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation`s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the US. Both the work carried out for the war effort and subsequent research, development, and production activities have produced (and continue to produce) radiological and hazardous wastes. This document contains a summary of environmental monitoring activities on the ORR and its surroundings. Environmental monitoring on the ORR consists of two major activities: effluent monitoring and environmental surveillance. Effluent monitoring involves the collection and analysis of samples or measurements of liquid and gaseous effluents prior to release into the environment; these measurements allow the quantification and official reporting of contaminants, assessment of radiation exposures to the public, and demonstration of compliance with applicable standards and permit requirements. Environmental surveillance consists of the collection and analysis of environmental samples from the site and its environs; this provides direct measurement of contaminants in air, water, groundwater, soil, foods, biota, and other media subsequent to effluent release into the environment. Environmental surveillance data verify ORR`s compliance status and, combined with data from effluent monitoring, allow the determination of chemical and radiation dose/exposure assessment of ORR operations and effects, if any, on the local environment.

  18. Page 1 DePaul/Cinespace Equipment Reservation Sheet

    E-Print Network [OSTI]

    Schaefer, Marcus

    head travel case 150.00$ 4 1x1 AB Gold Mount Adapter Plate 155.00$ 4 Anton Bauer Dionic 90 Battery 412.25$ 1 Anton Bauer TWQ 4-Battery Charger 1,156.00$ #12;Page 2 DePaul/Cinespace Equipment Reservation-D4-120 1,205.00$ 2 Diva-Lite 201 KIT-D2-120 881.00$ 6 Extra 25' 4 Bank Extensions 108.00$ 6 Extra 25

  19. Reserves in western basins: Part 1, Greater Green River basin

    SciTech Connect (OSTI)

    Not Available

    1993-10-01T23:59:59.000Z

    This study characterizes an extremely large gas resource located in low permeability, overpressured sandstone reservoirs located below 8,000 feet drill depth in the Greater Green River basin, Wyoming. Total in place resource is estimated at 1,968 Tcf. Via application of geologic, engineering and economic criteria, the portion of this resource potentially recoverable as reserves is estimated. Those volumes estimated include probable, possible and potential categories and total 33 Tcf as a mean estimate of recoverable gas for all plays considered in the basin. Five plays (formations) were included in this study and each was separately analyzed in terms of its overpressured, tight gas resource, established productive characteristics and future reserves potential based on a constant $2/Mcf wellhead gas price scenario. A scheme has been developed to break the overall resource estimate down into components that can be considered as differing technical and economic challenges that must be overcome in order to exploit such resources: in other words, to convert those resources to economically recoverable reserves. Total recoverable reserves estimates of 33 Tcf do not include the existing production from overpressured tight reservoirs in the basin. These have estimated ultimate recovery of approximately 1.6 Tcf, or a per well average recovery of 2.3 Bcf. Due to the fact that considerable pay thicknesses can be present, wells can be economic despite limited drainage areas. It is typical for significant bypassed gas to be present at inter-well locations because drainage areas are commonly less than regulatory well spacing requirements.

  20. Oak Ridge Reservation Bird Records and Population Trends

    SciTech Connect (OSTI)

    Roy, W Kelly [ORNL; Giffen, Neil R [ORNL; Wade, Murray [CDM Smith, Inc.; Haines, Angelina [Xcel Engineering, Inc.; Evans, James W. [TWRA; Jett, Robert Trent [Oak Ridge National Laboratory (ORNL)

    2014-11-01T23:59:59.000Z

    Bird data have been collected through surveys, environmental assessments, and other observations for decades in the Oak Ridge National Environmental Research Park, located on the US Department of Energy s Oak Ridge Reservation (ORR) in East Tennessee. Birds were recorded in a variety of habitats, including wetlands, interior forests, grasslands, ponds, corridors, forest edges, and more. Most of the information was gathered from waterfowl surveys conducted from 1990 to 2008, from Partners in Flight (PIF) breeding bird surveys conducted from 1995 to 2013, and from past publications and research on Reservation birds. We have also included our own observations and, in a few instances, credible observations of ORR birds of which we have been made aware through eBird or discussions with area ornithologists and bird watchers. For the period 1950 2014, we were able to document 228 species of birds on the ORR. Several of these species are known from historic records only, while others were not known to have ever occurred on the Reservation until recently. This report does not include PIF breeding bird data from the 2014 season or any records after July 2014. Twenty-two species approximately 10% of the total number of species observed have state-listed status in Tennessee as endangered, threatened, or in need of management. Of the 228 species we documented, 120 are believed to be breeding birds on the ORR.

  1. Wildlife Management Plan for the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Giffen, Neil R [ORNL; Evans, James W. [TWRA; Parr, Patricia Dreyer [ORNL

    2007-10-01T23:59:59.000Z

    This document outlines a plan for management of the wildlife resources on the Department of Energy's (DOE's) Oak Ridge Reservation. Management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures for attaining them. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species to produce selected species in desired numbers on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as endangered, threatened, of special concern, or in need of management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency (TWRA) and the Oak Ridge National Laboratory through agreements between TWRA and DOE and between DOE and UT-Battelle, LLC.

  2. Oak Ridge Reservation Bird Records and Population Trends

    SciTech Connect (OSTI)

    Roy, W. K. [ORNL; Giffen, N. R. [ORNL; Wade, M. C. [CDM Smith; Haines, A. M. [Xcel Engineering, Inc.; Evans, J. W. [TWRA; Jett, R. T. [ORNL

    2014-09-01T23:59:59.000Z

    Bird data have been collected through surveys, environmental assessments, and other observations for decades in the Oak Ridge National Environmental Research Park, located on the US Department of Energys Oak Ridge Reservation (ORR) in East Tennessee. Birds were recorded in a variety of habitats, including wetlands, interior forests, grasslands, ponds, corridors, forest edges, and more. Most of the information was gathered from waterfowl surveys conducted from 1990 to 2008, from Partners in Flight (PIF) breeding bird surveys conducted from 1995 to 2013, and from past publications and research on Reservation birds. We have also included our own observations and, in a few instances, credible observations of ORR birds of which we have been made aware through eBird or discussions with area ornithologists and bird watchers. For the period 19502014, we were able to document 228 species of birds on the ORR. Several of these species are known from historic records only, while others were not known to have ever occurred on the Reservation until recently. This report does not include PIF breeding bird data from the 2014 season or any records after July 2014. Twenty-two speciesapproximately 10% of the total number of species observedhave state-listed status in Tennessee as endangered, threatened, or in need of management. Of the 228 species we documented, 120 are believed to be breeding birds on the ORR.

  3. Habitat Restoration/Enhancement Fort Hall Reservation : 2008 Annual Report.

    SciTech Connect (OSTI)

    Osborne, Hunter [Shoshone Bannock Tribes

    2009-07-23T23:59:59.000Z

    Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2008. Enhancement and protection included sloping, fencing and planting wetlands plugs at sites on Spring Creek (Head-waters). Many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). Physical sampling during 2008 included sediment and depth measurements (SADMS) in Spring Creek at the Car Removal site. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for 5 strata on Spring Creek. Water temperature and chemistry were monitored monthly on Spring Creek, Clear Creek, Diggie Creek, and Portneuf (Jimmy Drinks) and Blackfoot rivers. Fish population densities and biomass were sampled in five reservation streams which included nine sites. Sampling protocols were identical to methods used in past years. Numbers of fish in Spring Creek series remained relatively low, however, there was an increase of biomass overall since 1993. Salmonid fry densities were monitored near Broncho Bridge and were similar to 2006, and 2007, however, as in years past, high densities of macrophytes make it very difficult to see fry in addition to lack of field technicians. Mean catch rate by anglers on Bottoms streams stayed the same as 2007 at 1.5/hr. Numbers of fish larger than 18-inches caught by anglers increased from 2007 at .20 to .26/hr.

  4. Wright Patman and the Federal Reserve System: a study in Congressional oversight.

    E-Print Network [OSTI]

    Burke, Violetta Mary

    1974-01-01T23:59:59.000Z

    is to examine how Congress has executed its oversight - continuous watchfulness over the activities of the administrative agencies under its jurisdiction - prerogatives with respect to the Federal * Reserve System - the Fed. Although the Federal Reserve...WRIGHT PATMAN AND THE FEDERAL RESERVE SYSTEM: A STUDY IN CONGRESSIONAL OVERSIGHT A Thesis VIOLETTA MARY BURKE Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirenent for ths degree of MASTER OF ARTS...

  5. Title 43 CFR 3814 Disposal of Reserved Minerals Under the Stockraising...

    Open Energy Info (EERE)

    Reserved Minerals Under the Stockraising Homestead Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation:...

  6. 16 U.S.C. 5: Rights-of-way through parks or reservations for...

    Open Energy Info (EERE)

    Rights-of-way through parks or reservations for power and communication facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  7. Chapter 5: Basic Concepts for Clean Energy Unsecured Lending and Loan Loss Reserve Funds

    Broader source: Energy.gov [DOE]

    Clean Energy Finance Guide, Third Edition, December 9, 2010, Chapter 5: Basic Concepts for Clean Energy Unsecured Lending and Loan Loss Reserve Funds.

  8. Structure and Design a Finance Program with Loan Loss Reserve Funds

    Broader source: Energy.gov [DOE]

    The process for structuring and designing a finance program with a loan loss reserve (LLR) fund typically includes research and preparing a finance program design document.

  9. ESnet's On-Demand Bandwidth Reservation Service Wins R&D 100...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    On-Demand Bandwidth Reservation Service Wins R&D 100 Award News & Publications ESnet News Media & Press Publications and Presentations Galleries ESnet Awards and Honors Contact Us...

  10. 1994-2007 China Academic Journal Electronic Publishing House. All rights reserved. http://www.cnki.net 1994-2007 China Academic Journal Electronic Publishing House. All rights reserved. http://www.cnki.net

    E-Print Network [OSTI]

    Tong, Jinnan

    © 1994-2007 China Academic Journal Electronic Publishing House. All rights reserved. http://www.cnki.net #12;© 1994-2007 China Academic Journal Electronic Publishing House. All rights reserved. http://www.cnki.net #12;© 1994-2007 China Academic Journal Electronic Publishing House. All rights reserved. http://www.cnki.net

  11. Documentation of the demonstrated reserve base of coal in the United States. Volume 2. Final report

    SciTech Connect (OSTI)

    Herhal, A J; Britton, S G; Minnucci, C A

    1982-03-01T23:59:59.000Z

    The purpose of this report is to document the methodologies used to develop the 1979 Demonstrated Reserve Base (DRB) of coal. The main body of this report summarizes the methodological procedures used to develop each state reserve estimate. The appendices to the report provide a detailed description of the entire DRB process for each state.

  12. Copyright 2001, USC/ISI. All rights reserved. An Optically Turbocharged

    E-Print Network [OSTI]

    Touch, Joe

    Copyright 2001, USC/ISI. All rights reserved. An Optically Turbocharged Internet Router CCW 2001Forwarder O/E converter #12;Copyright 2001, USC/ISI. All rights reserved. Optical Assist Optics as `fast path.E-03 1.E+00 1 2 3 Avg. Electrical Optical Rnd None FifoSeconds #12;Copyright 2001, USC/ISI. All

  13. Summary: U.S. Crude Oil, Natural Gas, and Natural Gas Liquids Proved Reserves

    E-Print Network [OSTI]

    Boyer, Elizabeth W.

    Summary: U.S. Crude Oil, Natural Gas, and Natural Gas Liquids Proved Reserves 2009 November 2010 U.S. Energy Information Administration Office of Oil, Gas, and Coal Supply Statistics U.S. Department or other Federal agencies. #12;#12;1 U.S. Crude Oil, Natural Gas, and Natural Gas Liquids Proved Reserves

  14. ORR Environmental Monitoring Program 6-1 6. Oak Ridge Reservation Environmental

    E-Print Network [OSTI]

    Pennycook, Steve

    program are analyzed to assess the environmental impact of DOE operations on the entire reservationORR Environmental Monitoring Program 6-1 6. Oak Ridge Reservation Environmental Monitoring Program In addition to environmental monitoring conducted at the three major Oak Ridge DOE installations

  15. MH-TRACE: MULTI-HOP TIME RESERVATION USING ADAPTIVE CONTROL FOR ENERGY EFFICIENCY

    E-Print Network [OSTI]

    Heinzelman, Wendi

    - TRACE is better than the throughput of CSMA type protocols under high trafic loads. INTRODUCTION EnergyMH-TRACE: MULTI-HOP TIME RESERVATION USING ADAPTIVE CONTROL FOR ENERGY EFFICIENCY Bulent Tavli, Rochester, NY 14627 Abstract- Multi-Hop Time Reservation Using Adaptive Control for Energy Efficiency (MH

  16. A novel branch and bound algorithm for optimal development of gas fields under uncertainty in reserves

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    in reserves Vikas Goel , Ignacio E. Grossmann Department of Chemical Engineering, Carnegie Mellon University and operational planning for development of gas fields under uncertainty in gas reserves. Assuming uncertainties models for planning in the oil and gas exploration and production industry. A major challenge

  17. Imminence of peak in US coal production and overestimation of reserves

    E-Print Network [OSTI]

    Khare, Sanjay V.

    1 Imminence of peak in US coal production and overestimation of reserves Nathan G. F. Reaver, coal reserves, coal production forecast, peak coal, USA energy, non- linear fitting #12;3 1 fuels, coal, oil, and natural gas, it is coal that is the most carbon intensive (W. Moomaw, 2011). Due

  18. Energy reserves and metabolism as indicators of coral recovery from bleaching Lisa J. Rodrigues1

    E-Print Network [OSTI]

    Grottoli, Andra G.

    Energy reserves and metabolism as indicators of coral recovery from bleaching Lisa J. Rodrigues1. Grottoli School of Earth Sciences, The Ohio State University, Columbus, Ohio 43210 Abstract With reduced of energy reserves (i.e., lipid, carbohydrate, protein) and heterotrophy to survive and recover

  19. Abstract ID 616 MC-TRACE: MULTICASTING THROUGH TIME RESERVATION USING ADAPTIVE CONTROL

    E-Print Network [OSTI]

    Heinzelman, Wendi

    Abstract ID 616 1 of 7 MC-TRACE: MULTICASTING THROUGH TIME RESERVATION USING ADAPTIVE CONTROL, University of Rochester, Rochester NY Abstract- In this paper, we present Multicasting through Time Reservation using Adaptive Control for Energy efficiency (MC-TRACE), which is an energy-efficient voice

  20. Oak Ridge Reservation Annual Site Environmental Report Summary 2002 Taking a Close Look Together

    E-Print Network [OSTI]

    Pennycook, Steve

    videos about the history, learn about the research going on, and talk to scientists about environmental1 Oak Ridge Reservation Annual Site Environmental Report Summary 2002 #12;2 Taking a Close Look the Oak Ridge Reservation and can now better interpret how they impact the environment. We see

  1. 2012 Eaton Corporation. All rights reserved. This is a photographic template your

    E-Print Network [OSTI]

    Lefèvre, Laurent

    © 2012 Eaton Corporation. All rights reserved. This is a photographic template ­ your photograph (dominiquelallement@eaton.com) #12;2© 2012 Eaton Corporation. All rights reserved. Green Days January 2012 Power Management in virtual server environment Agenda · Eaton Corporation · Power Management Software suite · Power

  2. U.S. Air Force Fact Sheet Air Force Reserve Officer Training Corps

    E-Print Network [OSTI]

    Su, Xiao

    U.S. Air Force Fact Sheet Air Force Reserve Officer Training Corps Mission Develop Quality Leaders for the Air Force. Personnel and Resources Air Force Reserve Officer Training Corps (ROTC) includes four,796 new Second Lieutenants who entered active duty in the United States Air Force. Organization Air Force

  3. Copyright (c) 1997 Cem Kaner. All Rights Reserved. 1 UCC Article 2BUCC Article 2B

    E-Print Network [OSTI]

    Copyright (c) 1997 Cem Kaner. All Rights Reserved. 1 UCC Article 2BUCC Article 2B Cem Kaner J.D., Ph.D. kaner@kaner.com 408-244-7000 March 31, 1997 You can download the latest draft of Article 2B site, www.kaner.com. #12;Copyright (c) 1997 Cem Kaner. All Rights Reserved. 2 Supplementary Materials

  4. .1October 8, 2005Copyright Albert R. Meyer, 2005. All rights reserved. Planar Graphs

    E-Print Network [OSTI]

    Goldwasser, Shafi

    .1October 8, 2005Copyright © Albert R. Meyer, 2005. All rights reserved. Drawing Planar Graphs Mathematics for Computer Science MIT 6.042J/18.062J #12;.2October 8, 2005Copyright © Albert R. Meyer, 2005 edges crossing. #12;.3October 8, 2005Copyright © Albert R. Meyer, 2005. All rights reserved. Planar

  5. Oak Ridge Reservation environmental report for 1992. Volume 1: Narrative

    SciTech Connect (OSTI)

    Koncinski, W.S. [ed.

    1993-09-01T23:59:59.000Z

    The two volumes of this report present data and supporting narratives regarding the impact of the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) on its environs and the public during 1992. This Volume (Volume 1) includes all narrative descriptions, summaries, and conclusions and is intended to be a ``stand-alone`` report for the reader who does not want to review in detail all of the 1992 data for the ORR. Volume 2 includes the detailed data in formats that ensure all the environmental data are represented. Narratives are not included in Vol. 2.

  6. Oak Ridge Reservation annual site environmental report for 1995

    SciTech Connect (OSTI)

    Koncinski, W.S. [ed.

    1996-09-01T23:59:59.000Z

    This report presents the details of the environmental monitoring and management program for the Oak Ridge Reservation. Topics discussed include: site background, climate, and operations; environmental compliance strategies; effluent monitoring; environmental management program including environmental restoration, decontamination and decommissioning, technology development, and public involvement; effluent monitoring of airborne discharges, liquid discharges, toxicity control and monitoring, biological monitoring and abatement; environmental surveillance which encompasses meteorological monitoring, ambient air monitoring, surface water monitoring, soils monitoring, sediment monitoring, and contamination of food stuffs monitoring; radiation doses; chemical exposures; ground water monitoring; and quality assurance.

  7. Kansas Natural Gas Plant Liquids, Proved Reserves (Million Barrels)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Building FloorspaceThousandWithdrawals0.0DecadeYear Jan Feb MarProved Reserves

  8. Mississippi Natural Gas Plant Liquids, Proved Reserves (Million Barrels)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto China (Million CubicCubic Feet) PriceLiquids, Proved Reserves

  9. Montana Natural Gas Plant Liquids, Proved Reserves (Million Barrels)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto China (Million CubicCubic32,876 10,889Decade Year-0andProved Reserves

  10. Ohio Crude Oil Reserves in Nonproducing Reservoirs (Million Barrels)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site. IfProved(Million Barrels)21 4.65per9 0 1 2 3+ LeaseReserves

  11. Oklahoma Coalbed Methane Proved Reserves (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site. IfProved(Million Barrels)21 4.65per9 0Proved ReservesCoalbed

  12. Oklahoma Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site. IfProved(Million Barrels)21 4.65per9 0Proved ReservesCoalbed+

  13. California (with State Offshore) Natural Gas Plant Liquids, Reserves Based

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecade Year-0ProvedGross WithdrawalsReservesProduction

  14. California (with State off) Coalbed Methane Proved Reserves (Billion Cubic

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecade Year-0ProvedGrossFeet) Proved Reserves

  15. California - San Joaquin Basin Onshore Coalbed Methane Proved Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReserves (Million Barrels) Crude

  16. California Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReserves (Million

  17. California Federal Offshore Crude Oil + Lease Condensate Proved Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReserves (MillionExpected Future(Million

  18. California Natural Gas, Wet After Lease Separation Proved Reserves (Billion

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear Jan Feb Mar Apr MayWellhead

  19. California State Offshore Crude Oil + Lease Condensate Proved Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear Jan Feb Mar Aprper(Million

  20. California--State Offshore Coalbed Methane Proved Reserves (Billion Cubic

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear Jan Feb MarSeparation,FutureFeet)

  1. California--State Offshore Crude Oil Reserves in Nonproducing Reservoirs

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear Jan Feb

  2. California--State Offshore Natural Gas Liquids Lease Condensate, Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear Jan FebFeet) GrossBased

  3. California--State Offshore Natural Gas Plant Liquids, Reserves Based

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear Jan FebFeet)Production (Million

  4. Colorado Coalbed Methane Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear JanDecade Year-0c.

  5. Colorado Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear JanDecade Year-0c.+ Lease Condensate

  6. Colorado Crude Oil Reserves in Nonproducing Reservoirs (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear JanDecade Year-0c.+ Lease

  7. Colorado Natural Gas Liquids Lease Condensate, Proved Reserves (Million

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear JanDecadeDecade Year-0Net

  8. Colorado Natural Gas Liquids Lease Condensate, Reserves Based Production

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear JanDecadeDecade Year-0Net(Million

  9. Colorado Natural Gas Plant Liquids, Reserves Based Production (Million

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear JanDecadeDecadeYear JanBarrels)

  10. Colorado Natural Gas, Wet After Lease Separation Proved Reserves (Billion

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear21 3.96 1967-2010Cubic Feet) Gas,

  11. Federal Offshore--California Natural Gas Liquids Lease Condensate, Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688Electricity Use as anCubic Feet) OilCubicReservesBased

  12. Gulf of Mexico Federal Offshore Natural Gas Liquids Proved Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688Electricity UseFoot)ProvedAfterthanReserves(Million

  13. Kansas Coalbed Methane Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688ElectricityLessApril 2015YearYear JanProved Reserves

  14. Kansas Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at1,066,688ElectricityLessApril 2015YearYear JanProved Reserves+

  15. Kentucky Coalbed Methane Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2

  16. Kentucky Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet) Decade Year-0 Year-1 Year-2+

  17. Kentucky Crude Oil Reserves in Nonproducing Reservoirs (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet) Decade Year-0 Year-1

  18. Kentucky Natural Gas Liquids Lease Condensate, Proved Reserves (Million

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet) DecadeYear Jan Feb Mar

  19. Kentucky Natural Gas Liquids Lease Condensate, Reserves Based Production

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet) DecadeYear Jan Feb Mar(Million

  20. Kentucky Natural Gas Plant Liquids, Reserves Based Production (Million

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet) DecadeYear JanBarrels)

  1. Kentucky Natural Gas, Wet After Lease Separation Proved Reserves (Billion

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal StocksProved Reserves (Billion Cubic Feet)Wellhead Price (Dollars perCubic

  2. Federal Offshore, Gulf of Mexico, Texas Proved Nonproducing Reserves

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.Gas Proved Reserves, Wet AfterDec. 31

  3. Alabama Coalbed Methane Proved Reserves (Billion Cubic Feet)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial andSeptember 25,9,1996 NProved Reserves (Billion Cubic

  4. Alabama Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial andSeptember 25,9,1996 NProved Reserves (Billion

  5. Alaska Crude Oil + Lease Condensate Proved Reserves (Million Barrels)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at Commercial andSeptemberProcessed in(MillionProductionReservesCrude

  6. Shale Natural Gas Proved Reserves as of Dec. 31

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14 Dec-14Table 4.April19.Data Series: Proved Reserves as

  7. Miscellaneous States Shale Gas Proved Reserves (Billion Cubic Feet)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of Fossil Energy, U.S.YearProved Reserves

  8. Mississippi (with State Offshore) Crude Oil Reserves in Nonproducing

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of Fossil Energy, U.S.YearProved ReservesReservoirs

  9. Mississippi (with State Offshore) Natural Gas Plant Liquids, Reserves Based

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of Fossil Energy, U.S.YearProvedReserves

  10. Texas (with State Offshore) Shale Proved Reserves (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content API GravityDakota" "Fuel, quality", 2013,Iowa"Dakota"Year Jan Feb Mar Apr May Jun JulShale Proved Reserves

  11. Texas - RRC District 6 Crude Oil + Lease Condensate Proved Reserves

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content API GravityDakota" "Fuel, quality", 2013,Iowa"Dakota"Year Jan Feb MarSeparation, Proved Reserves(Million

  12. Texas - RRC District 8 Crude Oil + Lease Condensate Proved Reserves

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content API GravityDakota" "Fuel, quality", 2013,Iowa"Dakota"Year Jan FebSeparation, Proved Reserves

  13. Texas State Offshore Crude Oil + Lease Condensate Proved Reserves (Million

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content API GravityDakota" "Fuel, quality", 2013,Iowa"Dakota"Year JanExpected FutureReservesBarrels) Crude Oil

  14. Federal Offshore, Pacific (California) Coalbed Methane Proved Reserves,

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.Gas Proved Reserves, Wet AfterDec.

  15. Federal Offshore, Pacific (California) Natural Gas Reserves Summary as of

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40CoalLease(Billion2,12803 Table A1.Gas Proved Reserves, Wet AfterDec.Dec. 31

  16. Primary Characteristics of Loan Loss Reserve Funds | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHA AdministrativeofDepartmentEnergyLoan loss reserve (LLR) funds

  17. West Virginia Coalbed Methane Proved Reserves (Billion Cubic Feet)

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content4,367,470 4,364,790 4,363,909 4,363,143 4,363,967 4,363,549 1973-2015 Alaska 14,197 14,197Cubic Feet)Proved Reserves

  18. West Virginia Crude Oil + Lease Condensate Proved Reserves (Million

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are nowTotal" (Percent) Type: Sulfur Content4,367,470 4,364,790 4,363,909 4,363,143 4,363,967 4,363,549 1973-2015 Alaska 14,197 14,197Cubic Feet)Proved ReservesBarrels)

  19. Wyoming Natural Gas Plant Liquids, Reserves Based Production (Million

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1(MillionExtensionsThousand Cubic%perYearBarrels) Reserves Based

  20. Reserving and Scheduling Transmission over the Time Change - February 23,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection Technical s OverviewB&W Y-12 LLC for the NationalReservations