RESEARCH AND DEVELOPMENT ACTIVITIES AT SAVANNAH RIVER SITE'S H CANYON FACILITY  

SciTech Connect

The Savannah River Site's (SRS) H Canyon Facility is the only large scale, heavily shielded, nuclear chemical separations plant still in operation in the U.S. The facility's operations historically recovered uranium-235 (U-235) and neptunium-237 (Np-237) from aluminum-clad, enriched-uranium fuel tubes from Site nuclear reactors and other domestic and foreign research reactors. Today the facility, in conjunction with HB Line, is working to provide the initial feed material to the Mixed Oxide Facility also located on SRS. Many additional campaigns are also in the planning process. Furthermore, the facility has started to integrate collaborative research and development (R&D) projects into its schedule. H Canyon can serve as the appropriate testing location for many technologies focused on monitoring the back end of the fuel cycle, due to the nature of the facility and continued operation. H Canyon, in collaboration with the Savannah River National Laboratory (SRNL), has been working with several groups in the DOE complex to conduct testing demonstrations of novel technologies at the facility. The purpose of conducting these demonstrations at H Canyon will be to demonstrate the capabilities of the emerging technologies in an operational environment. This paper will summarize R&D testing activities currently taking place in H Canyon and discuss the possibilities for future collaborations.

Sexton, L.; Fuller, Kenneth

2013-07-09T23:59:59.000Z

2

Overview of Fiscal Year 2002 Research and Development for Savannah River Site's Salt Waste Processing Facility  

SciTech Connect

The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste program is responsible for storage, treatment, and immobilization of high-level waste for disposal. The Salt Processing Program (SPP) is the salt (soluble) waste treatment portion of the SRS high-level waste effort. The overall SPP encompasses the selection, design, construction and operation of treatment technologies to prepare the salt waste feed material for the site's grout facility (Saltstone) and vitrification facility (Defense Waste Processing Facility). Major constituents that must be removed from the salt waste and sent as feed to Defense Waste Processing Facility include actinides, strontium, cesium, and entrained sludge. In fiscal year 2002 (FY02), research and development (R&D) on the actinide and strontium removal and Caustic-Side Solvent Extraction (CSSX) processes transitioned from technology development for baseline process selection to providing input for conceptual design of the Salt Waste Processing Facility. The SPP R&D focused on advancing the technical maturity, risk reduction, engineering development, and design support for DOE's engineering, procurement, and construction (EPC) contractors for the Salt Waste Processing Facility. Thus, R&D in FY02 addressed the areas of actual waste performance, process chemistry, engineering tests of equipment, and chemical and physical properties relevant to safety. All of the testing, studies, and reports were summarized and provided to the DOE to support the Salt Waste Processing Facility, which began conceptual design in September 2002.

H. D. Harmon, R. Leugemors, PNNL; S. Fink, M. Thompson, D. Walker, WSRC; P. Suggs, W. D. Clark, Jr

2003-02-26T23:59:59.000Z

3

DECOMMISSIONING OF THE NUCLEAR FACILITIES OF VKTA AT THE ROSSENDORF RESEARCH SITE  

SciTech Connect

VKTA decommissioned the old nuclear facilities of former GDR's (German Democratic Republic) Central Institute of Nuclear Research which was closed end of 1991. VKTA is responsible for fissile material and waste management, environmental and radiation protection and runs an accredited laboratory for environmental and radionuclide analytics. The Rossendorf research site is located east of the city of Dresden. The period from 1982 to about 1997 was mainly characterized by obtaining the necessary licenses for decommissioning and developing a new infrastructure (i.e. waste treatment facility, interim storages for fissile material and waste, clearance monitoring facility). The decommissioning work has been in progress since that time. The decommissioning projects are concentrated on three complexes: (1) the reactors and a fuel development and testing facility, (2) the radioisotope production facilities, and (3) the former liquid and solid waste storage facilities. The status of decommissioning progress and treatment of the residues will be demonstrated. Finally an outlook will be given on the future tasks of VKTA based on the ''Conception VKTA 2000 plus'', which was confirmed by the Saxonian government last year.

U. Helwig, W. Boessert

2003-02-27T23:59:59.000Z

4

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites

banner banner Home | People | Site Index Atmospheric Radiation Measurement Climate Research Facility US Department of Energy About Science Campaigns Sites Instruments Measurements Data News Publications Education Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings Propose a Campaign Submitting Proposals: Guidelines Featured Campaigns Campaign Data List of Campaigns Aerial Facility Eastern North Atlantic Mobile Facilities North Slope of Alaska Southern Great Plains Tropical Western Pacific Location Table Contacts Instrument Datastreams Value-Added Products PI Data Products Field Campaign Data Related Data

5

The Joint Actinide Shock Physics Experimental Research Facility at the Nevada National Security Site, OAS-L-12-05  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Actinide Shock Physics Joint Actinide Shock Physics Experimental Research Facility at the Nevada National Security Site OAS-L-12-05 April 2012 Department of Energy Washington, DC 20585 April 23, 2012 MEMORANDUM FOR THE MANAGER, NEVADA SITE OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Joint Actinide Shock Physics Experimental Research Facility at the Nevada National Security Site" BACKGROUND The Department of Energy, National Nuclear Security Administration's, Joint Actinide Shock Physics Experimental Research (JASPER) facility plays an integral role in the certification of the Nation's nuclear weapons stockpile by providing a method to generate and measure data

6

NREL: Wind Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Our facilities are designed to meet the wind industry's critical research needs with state-of-the-art design and testing facilities. NREL's unique and highly versatile facilities at the National Wind Technology Center offer research and analysis of wind turbine components and prototypes rated from 400 watts to 3 megawatts. Satellite facilities support the growth of wind energy development across the United States. National Wind Technology Center Facilities Our facilities are contained within a 305-acre area that comprises field test sites, test laboratories, industrial high-bay work areas, machine shops, electronics and instrumentation laboratories, and office areas. In addition, there are hundreds of test articles and supporting components such as turbines, meteorological towers, custom test apparatus, test sheds,

7

Research Facility,  

NLE Websites -- All DOE Office Websites (Extended Search)

Collecting and Delivering the Data Collecting and Delivering the Data As a general condition for use of the ARM Climate Research Facility, users are required to include their data in the ARM Data Archive. All data acquired must be of sufficient quality to be useful and must be documented such that users will be able to clearly understand the meaning and organization of the data. Final, quality-assured data sets are stored in the Data Archive and are freely accessible to the general scientific community. Preliminary data may be shared among field campaign participants during and shortly following the campaign. To facilitate sharing of preliminary data, the ARM Data Archive establishes restricted access capability, limited to participants and data managers.

8

NREL: Technology Transfer - Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facilities Research Facilities Photo of Solar Energy Research Facility building at NREL. NREL's Solar Energy Research Facility is one of many world-class facilities available to public and private agencies. For developing commercially viable energy products, organizations may partner with NREL to use our state-of-the-art laboratories, and testing and user facilities. Visit NREL's Research Facilities Web site to learn more about them. We typically develop technology partnership agreements for using our facilities and/or working with our researchers. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Nondisclosure Agreements Research Facilities Commercialization Programs Success Stories News Contacts Did you find what you needed?

9

NREL: Buildings Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL provides industry, government, and university researchers with access to state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency technologies and innovations. NREL engineers and researchers work closely with industry partners to research and develop advanced technologies. NREL's existing facilities have been used to test and develop many award-winning building technologies and innovations that deliver significant energy savings in buildings, and the new facilities further extend those capabilities. In addition, the NREL campus includes living laboratories, buildings that researchers and other NREL staff use every day. Researchers monitor real-time building performance data in these facilities to study energy use

10

NREL: Photovoltaics Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL's world-class research facilities provide the venue for innovative advances in photovoltaic technologies and applications. These facilities within the National Center for Photovoltaics (NCPV) serve both multi-use and dedicated-use functions. We encourage our research colleagues in industry, universities, and other laboratories to pursue opportunities in working with our staff in these facilities. Dedicated-Use Facilities Photo of a red-hot coil glowing inside a round machine. Research within these facilities focuses on targeted areas of interest that require specific tools, techniques, or unique capabilities. Our two main dedicated-use facilities are the following: Outdoor Test Facility (OTF) OTF researchers study and evaluate advanced or emerging PV technologies

11

BNL | Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven's Research Facilities Brookhaven's Research Facilities Tools of Discovery Brookhaven National Lab excels at the design, construction, and operation of large-scale, cutting-edge research facilities-some available nowhere else in the world. Each year, thousands of scientists from laboratories, universities, and industries around the world use these facilities to delve into the basic mysteries of physics, chemistry, biology, materials science, energy, and the environment-and develop innovative applications that arise, sometimes at the intersections of these disciplines. construction Brookhaven Lab is noted for the design, construction and operation of large-scale, cutting-edge research facilities that support thousands of scientists worldwide. RHIC tunnel Relativistic Heavy Ion Collider

12

NREL: Solar Radiation Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Photo of two researchers standing on a platform near a solar tracker at the Solar Radiation Research Laboratory. The Solar Radiation Research Laboratory gathers solar radiation and meteorological data on South Table Mountain. NREL's Solar Radiation Research Laboratory (SRRL) has been collecting continuous measurements of basic solar radiation components since 1981. Since then, it has expanded its expertise to include integrated metrology, optics, electronics, and data acquisition capabilities. In addition, the SRRL provides facilities for outdoor performance testing of new research instrumentation and energy conversion devices such as photovoltaic modules. The SRRL is located on NREL's South Table Mountain site in Golden, Colorado, where it has excellent solar access because of its unrestricted

13

Site maps and facilities listings  

SciTech Connect

In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used for production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.

Not Available

1993-11-01T23:59:59.000Z

14

Photovoltaic Research Facilities  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) funds photovoltaic (PV) research and development (R&D) at its national laboratory facilities located throughout the country. To encourage further innovation,...

15

NREL: Research Facilities - Test and User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and User Facilities Test and User Facilities NREL has test and user facilities available to industry and other organizations for researching, developing, and evaluating renewable energy and energy efficiency technologies. Here you'll find an alphabetical listing and brief descriptions of NREL's test and user facilities. A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z A Advanced Research Turbines At our wind testing facilities, we have turbines available to test new control schemes and equipment for reducing loads on wind turbine components. Learn more about the Advanced Research Turbines on our Wind Research website. Back to Top D Distributed Energy Resources Test Facility This facility was designed to assist the distributed power industry in the

16

Lighting Research Group: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Lighting Research Facilities at LBNL gonio-photometer Gonio-photometer We use this device to measure the intensity and direction of the light from a lamp or fixture. integrating sphere Integrating sphere This instrument allows us to get a fast and accurate measurement of the total light output of a lamp. We are not able to determine the direction of the light, only the intensity. power analyzer Power analyzer We use our power analyzer with the lamps in the gonio-photometer to measure input power, harmonic distortion, power factor, and many other signals that tell us how well a lamp is performing. spectro-radiometer Spectro-radiometer This device measures not only the intensity of a light source but also the intensity of the light at each wavelength.

17

NREL: Research Facilities Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Research Facilities Here you'll find information about the National Renewable Energy Laboratory's R&D facility and laboratory capabilities. These state-of-the-art facilities...

18

224-T Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

T Facility Projects & Facilities 100 Area 118-K-1 Burial Ground 200 Area 209-E Critical Mass Laboratory 222-S Laboratory 224-B Facility 224-T Facility 242-A Evaporator 300 Area 324...

19

Cold Test Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects & Facilities > Cold Test Facility Projects & Facilities 100 Area 118-K-1 Burial Ground 200 Area 209-E Critical Mass Laboratory 222-S Laboratory 224-B Facility 224-T...

20

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Recovery Act Learn about ARM's efforts. The Atmospheric Radiation Measurement (ARM) Climate Research Facility is a U.S. Department of Energy scientific user facility, providing data from strategically located in situ and remote sensing observatories around the world. [ Live Data Displays ] Featured Data 09.19.2013 New ARM Best Estimate Land Product Contains Critical Soil Quantities for Describing Land Properties 09.12.2013 Value-Added Product Estimates Planetary Boundary Layer Height from Radiosondes 08.29.2013 New Data Available for Precipitation Value-Added Product Feature12.30.2013 Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere For the first time, ARM ventures to Antarctica for one of several newly

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman October 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

22

Medical Testing and Surveillance Facilities - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

About Us > Hanford Site Wide Programs > Beryllium Program > Medical Testing and Surveillance Facilities About Us Beryllium Program Beryllium Program Points of Contact Beryllium...

23

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman November 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

24

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman June 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

25

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman October 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

26

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman January 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

27

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman July 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

28

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman February 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof. The views and

29

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 ARM Climate Research Facility Spectral Surface Albedo Value-Added Product (VAP) Report S McFarlane K Gaustad C Long E Mlawer July 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

30

NETL: Research Capabilities and Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Capabilities and Facilities Research Capabilities and Facilities Onsite Research Research Capabilities and Facilities Lab Worker As the lead field center for the DOE Office of Fossil Energy's research and development program, NETL has established a strong onsite research program conducted by Federal scientists and engineers. Onsite R&D – managed by NETL's Office of Research and Development – makes important contributions to NETL's mission of implementing a research, development, and demonstration program to resolve the environmental, supply, and reliability constraints of producing and using fossil resources. With its expert research staff and state-of-the-art facilities, NETL has extensive experience in working with the technical issues related to fossil resources. Onsite researchers also participate with NETL's industrial partners to solve problems that become barriers to commercialization of power systems, fuels, and environmental and waste management. Onsite research capabilities are strengthened by collaborations with well-known research universities.

31

WCI | Cutting-Edge Facilities | Site 300 Experimental Test Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Site 300 Site Access Contained Firing Facility (CFF) Continuously Operating Reference Station (CORS) What is Site 300? Lawrence Livermore National Laboratory's Site 300 is an experimental test site operated by the Lawrence Livermore National Security, LLC, for the Department of Energy's National Nuclear Security Administration. It is situated on 7,000 acres in rural foothills approximately six miles southwest of downtown Tracy and 15 miles southeast of Livermore. Site 300 was established in 1955 as a non-nuclear explosives test facility to support Livermore Laboratory's national security mission. The site gets its name from the early days of Lawrence Livermore, when the main laboratory was called Site 200 and the test facility was Site 300 (Lawrence Berkeley National Laboratory was Site 100). Today, work at Site 300

32

Atmospheric Radiation Measurement Climate Research Facility | Argonne  

NLE Websites -- All DOE Office Websites (Extended Search)

Atmospheric Radiation Measurement Climate Research Facility Atmospheric Radiation Measurement Climate Research Facility Argonne scientists study climate change 1 of 22 Argonne scientists study climate change The U.S. Department of Energy's Office of Science provided $60 million in ARRA funding for climate research to the Atmospheric Radiation Measurement (ARM) Climate Research Facility, a DOE national user facility that has been operating climate observing sites around the world for nearly two decades. These sites help scientists study clouds and their influence on the sun's radiant energy, which heats our planet. Above is one of the purchases: the Vaisala Present Weather Detector. It optically measures visibility, present weather, precipitation intensity, and precipitation type. It provides a measure of current weather conditions by combining measurements from three

33

Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) Massachusetts Hazardous Waste Facility Siting Act (Massachusetts) < Back Eligibility Commercial Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Program Info State Massachusetts Program Type Siting and Permitting Provider Department of Environmental Protection This Act establishes the means by which developers of proposed hazardous waste facilities will work with the community in which they wish to construct a facility. When the intent to construct, maintain, and/or operate a hazardous waste facility in a city or town is demonstrated, a local assessment committee will be established by that community. The

34

Nano Research Facility Lab Safety Manual Nano Research Facility  

E-Print Network (OSTI)

1 Nano Research Facility Lab Safety Manual Nano Research Facility: Weining Wang Office: Brauer rules and procedures (a) Accidents and spills for chemicals Not containing Nano-Materials Spills of non for chemicals Containing Nano-Materials In a fume hood small spills of nano-materials in a liquid may

Subramanian, Venkat

35

NREL: Research Facilities - Laboratories and Facilities by Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratories and Facilities by Technology The following NREL research programs have laboratory, andor test and user facility capabilities for researching, developing, and testing...

36

NREL: Photovoltaics Research - Solar Energy Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Solar Energy Research Facility Solar Energy Research Facility Photo of the Solar Energy Research Facility. The exterior stepped clerestory of the Solar Energy Research Facility. Photovoltaics (PV) and basic energy sciences are two major research areas conducted in the Solar Energy Research Facility (SERF). The building incorporates a multitude of energy saving features that make it one of the government's most energy efficient buildings with 40 percent lower energy costs than similar buildings designed to meet federal energy standards. The SERF houses three adjoining modules each containing a laboratory pod and an office pod. Laboratories in the west module are used to develop semiconductor material for high-efficiency crystalline solar cells. Laboratories in the center module are used to fabricate prototype solar

37

Advanced Powertrain Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

95F 95F Vehicle Setup Information Vehicle architecture PHEV Test cell location Front Advanced Powertrain Research Facility Document date 10/18/2013 Vehicle dynamometer Input Revision Number 1 Test weight [lb] 3518 Notes: Target A [lb] 21.47 Target B [lb/mph] 0.21588 Target C [lb/mph^2] 0.012508 Test Fuel Information Revision Number 1 Test weight [lb] 3518 Test Fuel Information Fuel type EPA Tier II EEE HF0437 Fuel density [g/ml] 0.742 Fuel Net HV [BTU/lbm] 18475 Fuel type EPA Tier II EEE HF0437 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t c h [ S M ] o r c o n s t a n t s p e e d [ C S ] S o l a r L a m p s [ W / m 2 ] V e i c l e C l i m a t e C o n t r o l s e t t i n g s H o o d P o s i t i o n [ U p ] o r [ C l o s e d ] W i n d o w P o s i t i o n [ C l o s e d ] o r [ D o w n ] C y

38

CMR: Chemistry and Metallurgy Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

CMR: Chemistry and Metallurgy Research Facility CMR: Chemistry and Metallurgy Research Facility The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR)...

39

NREL: Research Facilities - Working with Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working with Us Working with Us For developing commercially viable energy products, organizations may partner with NREL to use our state-of-the-art laboratories, testing and user facilities. We typically develop technology partnership agreements for using our facilities and/or working with our researchers. Learn more about technology partnership agreements on the NREL Technology Transfer Web site. Printable Version Research Facilities Home Laboratories Test & User Facilities Laboratories & Facilities by Technology Working with Us Did you find what you needed? Yes 1 No 0 Thank you for your feedback. Would you like to take a moment to tell us how we can improve this page? Submit We value your feedback. Thanks! We've received your feedback. Something went wrong. Please try again later.

40

Preliminary siting characterization Salt Disposition Facility - Site B  

SciTech Connect

A siting and reconnaissance geotechnical program has been completed in S-Area at the Savannah River Site in South Carolina. This program investigated the subsurface conditions for the area known as ``Salt Disposition Facility (SDF), Site B'' located northeast of H-Area and within the S-Area. Data acquired from the Site B investigation includes both field exploration and laboratory test data.

Wyatt, D.

2000-01-04T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

NREL: Electricity Integration Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL's electricity integration research is conducted in state-of-the-art facilities. These facilities assist industry in the development of power systems and address the operational challenges of full system integration. The Energy Systems Integration Facility can be used to design, test, and analyze components and systems to enable economic, reliable integration of renewable electricity, fuel production, storage, and building efficiency technologies with the U.S. electricity delivery infrastructure. New grid integration capabilities at the National Wind Technology Center will allow testing of many grid integration aspects of multi-megawatt, utility-scale variable renewable generation and storage technologies. The Distributed Energy Resources Test Facility can be used to characterize,

42

Site Visit Report, Hanford Waste Encapsulation Storage Facility...  

Energy Savers (EERE)

Site Visit Report, Hanford Waste Encapsulation Storage Facility - January 2011 Site Visit Report, Hanford Waste Encapsulation Storage Facility - January 2011 January 2011 Hanford...

43

Salt Processing at the Savannah River Site: Results of Technology Down-Selection and Research and Development to Support New Salt Waste Processing Facility  

SciTech Connect

The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste (HLW) program is responsible for storage, treatment, and immobilization of HLW for disposal. The Salt Processing Project (SPP) is the salt waste (water-soluble) treatment portion of this effort. The overall SPP encompasses the selection, design, construction, and operation of technologies to prepare the salt-waste feed material for immobilization at the site's Saltstone Production Facility (SPF) and vitrification facility (Defense Waste Processing Facility [DWPF]). Major constituents that must be removed from the salt waste and sent as feed to DWPF include cesium (Cs), strontium (Sr), and actinides. In April 2000, the DOE Deputy Secretary for Project Completion (EM-40) established the SRS Salt Processing Project Technical Working Group (TWG) to manage technology development of treatment alternatives for SRS high-level salt wastes. The separation alternatives investigated included three candidate Cs-removal processes selected, as well as actinide and Sr removal that are also required as a part of each process. The candidate Cs-removal processes are: crystalline Silicotitanate Non-Elutable Ion Exchange (CST); caustic Side Solvent Extraction (CSSX); and small Tank Tetraphenylborate Precipitation (STTP). The Tanks Focus Area was asked to assist DOE by managing the SPP research and development (R&D), revising roadmaps, and developing down-selection criteria. The down-selection decision process focused its analysis on three levels: (a) identification of goals that the selected technology should achieve, (b) selection criteria that are a measure of performance of the goal, and (c) criteria scoring and weighting for each technology alternative. After identifying the goals and criteria, the TWG analyzed R&D results and engineering data and scored the technology alternatives versus the criteria. Based their analysis and scoring, the TWG recommended CSSX as the preferred alternative. This recommendation was formalized in July 2001 when DOE published the Savannah River Site Salt Processing Alternatives Final Supplemental Environmental Impact Statement (SEIS) and was finalized in the DOE Record of Decision issued in October 2001.

Lang, K.; Gerdes, K.; Picha, K.; Spader, W.; McCullough, J.; Reynolds, J.; Morin, J. P.; Harmon, H. D.

2002-02-26T23:59:59.000Z

44

Nevada Test Site Sensor Test Facility  

SciTech Connect

A Sensor Test Facility (STF) was recently established at the Department of Energy`s Nevada Test Site (NTS). It has been used for a series of sensor tests that have demonstrated the usefulness of the testbed. The facility consists of a cut-and-cover bunker complex and the two square mile surrounding area. The STF was developed as a scientific testbed optimized for the development and evaluation of advanced sensor systems, including ground sensor systems designed to identify and detect hardened underground facilities. This was accomplished by identifying a facility in a remote location where seismic, acoustic, and electromagnetic interference would be minimal, establishing a testbed that would be accommodating to field testing, and conducting a thorough geophysical characterization of the area surrounding the facility in order to understand the local geology and its effects on geophysical signals emanating from the facility. The STF is representative of a number of cut-and-cover bunkers around the world that are used for the manufacture and/or storage of weapons of mass destruction. This paper provides a general description of the Nevada Test Site, the Sensor Test Facility, and the Geophysical Site Characterization.

Gomez, B.J.; Boyer, W.B.

1996-12-01T23:59:59.000Z

45

NREL: Transportation Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

work closely with a wide variety of partners to research and develop advanced transportation technologies and systems, moving them from the R&D arena to the marketplace. Learn...

46

Site and facility transportation services planning documents  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) will eventually ship Purchasers' (10 CFR 961.3) spent nuclear fuel from approximately 122 commercial nuclear facilities. The preparation and processing of Site and Facility Specific Transportation Services Planning Documents (SPDs) and Site Specific Servicing Plans (SSSPs) provides a focus for advanced planning and the actual shipping of waste, as well as the overall development of transportation requirements for the waste transportation system. SPDs will be prepared for each of the affected nuclear waste facilities over the next 2 years with initial emphasis on facilities likely to be served during the earliest years of the Federal Waste Management System (FWMS) operations. 3 figs., 1 tab.

Ratledge, J.E. (Oak Ridge National Lab., TN (USA)); Danese, L.; Schmid, S. (Science Applications International Corp., Oak Ridge, TN (USA))

1990-01-01T23:59:59.000Z

47

Regional analysis of energy facility siting  

SciTech Connect

This paper has examined some of the regional environmental parameters of energy facility siting, with emphasis on air quality impacts. An example of a siting optimization study was presented, and it was shown how difficult it presently is to specify an environmental objective function that is universally applicable. The importance of regional background effects was discussed, and long-range transport models were used to analyze the relative importance of local and long-range impacts.

Lipfert, F W; Meier, P M; Kleinman, L I

1980-01-01T23:59:59.000Z

48

Independent Oversight Review, Hanford Site K-West Annex Facility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

K-West Annex Facility - April 2014 Independent Oversight Review, Hanford Site K-West Annex Facility - April 2014 April 2014 Review of the Hanford Site K-West Annex Facility...

49

NREL: Energy Systems Integration Facility - Research Electrical...  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Electrical Distribution Bus The Research Electrical Distribution Bus is the Energy Systems Integration Facility's internal utility infrastructure interconnecting its...

50

On-Site Disposal Facility Inspection Report  

Office of Legacy Management (LM)

72.1 0614 On-Site Disposal Facility Inspection Report June 2014 6319-D6320 8972.2 0614 East Face Cell 1 West Face Cell 1 6319D-6322 6319D-6346 8972.3 0614 North Face Cell 1...

51

Site & Facility Restoration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restoration Restoration Site & Facility Restoration Deactivation & Decommissioning (D&D) Deactivation and Decommissioning (D&D) is the process of taking an active/excess/abandoned facility to a final disposition end state. Because of residual radioactivity, other hazardous constituents, and the physical condition of EM's facilities, D&D presents unique hazards that must be addressed from a safety, programmatic, environmental, and technological standpoint. Read more Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages the largest groundwater and soil remediation effort in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic

52

National Ignition Facility Project Site Safety Program  

SciTech Connect

This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES&H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES&H requirements are consistent with the ''LLNL ES&H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B.

Dun, C

2003-09-30T23:59:59.000Z

53

Ames Laboratory Research Reactor Facility Ames, Iowa  

Office of Legacy Management (LM)

,, *' ; . Final Radiological Condition of the Ames Laboratory Research Reactor Facility Ames, Iowa _, . AGENCY: Office of Operational Safety, Department of Energy ' ACTION: Notice of Availability of Archival Information Package SUMMARY: The'Office of Operational Safety of the Department O i Energy (DOE) has reviewed documentation relating to the decontamination and decommissioning operations conducted at the Ames Laboratory Research Reactor Facility, Ames, Iowa and has prepared an archival informati0.n package to permanently document the results of the action and the site conditions and use restriction placed on the . site at the tim e of release. This review is based on post-decontamination survey data and other pertinent documentation referenced in and included in the archival package. The material and

54

NREL: Energy Systems Integration Facility - Research Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure The foundation of the Energy Systems Integration Facility is its research infrastructure. In addition to extensive fixed equipment, the facility incorporates...

55

Washington State Energy Facility Site Evaluation Council | Open Energy  

Open Energy Info (EERE)

Energy Facility Site Evaluation Council Energy Facility Site Evaluation Council Jump to: navigation, search Name Washington State Energy Facility Site Evaluation Council Short Name EFSEC Place Olympia, Washington Zip 98504 Website http://www.efsec.wa.gov/defaul References EFSEC: Energy Facility Siting Evaluation Council[1] This article is a stub. You can help OpenEI by expanding it. The Washington State Energy Facility Siting Council (EFSEC) oversees the siting process for major energy facilities in the State of Washington. EFSEC coordinates all evaluation and licensing steps for siting certain energy facilities. References ↑ "EFSEC: Energy Facility Siting Evaluation Council" Retrieved from "http://en.openei.org/w/index.php?title=Washington_State_Energy_Facility_Site_Evaluation_Council&oldid=694902

56

Chapter 2 Transmission Facility Siting, Route Segments and Action...  

NLE Websites -- All DOE Office Websites (Extended Search)

facilities, such as the proposed I-5 Project. It describes the general factors that BPA considers in siting potential new facilities. It then discusses how potential...

57

Cold Vacuum Drying Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Disposal Facility U Plant Vitrification Plant Waste Encapsulation and Storage Facility Waste Receiving and Processing Facility Waste Sampling and Characterization Facility Waste...

58

DOE Designated User Facilities Multiple Laboratories * ARM Climate Research Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Designated User Facilities Designated User Facilities Multiple Laboratories * ARM Climate Research Facility Argonne National Laboratory * Advanced Photon Source (APS) * Electron Microscopy Center for Materials Research * Argonne Tandem Linac Accelerator System (ATLAS) * Center for Nanoscale Materials (CNM) * Argonne Leadership Computing Facility (ALCF) * Brookhaven National Laboratory * National Synchrotron Light Source (NSLS) * Accelerator Test Facility (ATF) * Relativistic Heavy Ion Collider (RHIC) * Center for Functional Nanomaterials (CFN) * National Synchrotron Light Source II (NSLS-II ) (under construction) Fermi National Accelerator Laboratory * Fermilab Accelerator Complex Idaho National Laboratory * Advanced Test Reactor ** * Wireless National User Facility (WNUF)

59

Research Facilities & Centers | Clean Energy | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Energy Clean Energy Research Areas Research Highlights Facilities and Centers BioEnergy Science Center Building Technologies Research and Integration Center Carbon Fiber Technology Facility Center For Structural Molecular Biology Climate Change Science Institute Joint Institute for Biological Sciences Manufacturing Demonstration Facility National Transportation Research Center Tools & Resources News and Awards Supporting Organizations Clean Energy Home | Science & Discovery | Clean Energy | Facilities and Centers SHARE Facilities, Centers Welcome Industry, Academia Oak Ridge National Laboratory facilities and capabilities together provide a unique environment for Clean Energy research. For example, as the lead institution for DOE's BioEnergy Science Center, ORNL is pioneering

60

Sandia National Laboratories: Research: Facilities: Technology Deployment  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering Sciences Experimental Facilities (ESEF) Engineering Sciences Experimental Facilities (ESEF) Technology Deployment Centers Advanced Power Sources Laboratory Engineering Sciences Experimental Facilities (ESEF) Trisonic Wind Tunnel Hypersonic Wind Tunnel High Altitude Chamber Explosive Components Facility Ion Beam Laboratory Materials Science and Engineering Center Pulsed Power and Systems Validation Facility Radiation Detection Materials Characterization Laboratory Shock Thermodynamic Applied Research Facility (STAR) Weapon and Force Protection Center Design, Evaluation and Test Technology Facility Research Engineering Sciences Experimental Facilities (ESEF) The ESEF complex contains several independent laboratories for experiments and advanced diagnostics in the fields of thermodynamics, heat transfer,

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Environmental Restoration Disposal Facility - Hanford Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Receiving and Processing Facility Waste Sampling and Characterization Facility Waste Treatment Plant Environmental Restoration Disposal Facility Email Email Page | Print Print...

62

NREL: Energy Systems Integration Facility - Research Themes  

NLE Websites -- All DOE Office Websites (Extended Search)

laboratory. Researchers use the testing and simulation capabilities of the Energy Systems Integration Facility to accelerate grid modernization research, development, and...

63

NREL Research Support Facilities (RSF)  

Golden, CO NREL's Research Support Facilities building (RSF) will be a total of 218,000 sq. feet. It will have two parallel secured employee wings, one of which will be 4 stories and the other 3 stories. A connector building housing most of the public spaces will run perpendicular through both wings. The RSF will provide workspace for 742 employees. The RSF is designed to be a zero energy building through the use of innovative energy efficiency, daylighting, and renewable energy strategies, including photovoltaic solar electric systems to generate electricity.

64

Hazardous Waste Facility Siting Program (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Siting Program (Maryland) Facility Siting Program (Maryland) Hazardous Waste Facility Siting Program (Maryland) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Transportation Utility Program Info State Maryland Program Type Siting and Permitting Provider Maryland Department of the Environment The Hazardous Waste Facilities Siting Board is responsible for overseeing the siting of hazardous waste facilities in Maryland, and will treat hazardous waste facilities separately from low-level nuclear waste facilities. This legislation describes the factors considered by the Board in making siting decisions. The Board is authorized to enact rules and regulations pertaining to the siting of hazardous and low-level nuclear

65

Atmospheric Radiation Measurement Climate Research Facility - annual report 2004  

NLE Websites -- All DOE Office Websites (Extended Search)

ER-ARM-0403 ER-ARM-0403 3 Table of Contents Program Overview ............................................................................................................................................................ 4 The Role of Clouds in Climate .................................................................................................................................... 4 ARM Science Goals ..................................................................................................................................................... 4 ARM Climate Research Facility: Successful Science Program Leads to User Facility Designation ................................ 5 Sites Around the World Enable Real Observations .......................................................................................................

66

ARM Climate Research Facility Annual Report 2005  

SciTech Connect

Through the ARM Program, the DOE funded the development of several highly instrumented ground stations for studying cloud formation processes and their influence on radiative transfer, and for measuring other parameters that determine the radiative properties of the atmosphere. This scientific infrastructure, and resultant data archive, is a valuable national and international asset for advancing scientific knowledge of Earth systems. In fiscal year (FY) 2003, the DOE designated ARM sites as a national scientific user facility: the ARM Climate Research (ACRF). The ACRF has enormous potential to contribute to a wide range interdisciplinary science in areas such as meteorology, atmospheric aerosols, hydrology, biogeochemical cycling, and satellite validation, to name only a few.

J. Voyles

2005-12-31T23:59:59.000Z

67

Method for siting detectors within a facility  

DOE Patents (OSTI)

A method, system and article of manufacture of siting one or more detectors in a facility represented with zones are provided. Signals S.sub.i,j representing an effect in zone j in response to a release of contaminant in zone i for one or more flow conditions are provided. A candidate architecture has one or more candidate zones. A limiting case signal is determined for each flow condition for multiple candidate architectures. The limiting case signal is a smallest system signal of multiple system signals associated with a release in a zone. Each system signal is a maximum one of the signals representing the effect in the candidate zones from the release in one zone for the flow condition. For each candidate architecture, a robust limiting case signal is determined based on a minimum of the limiting case signals. One candidate architecture is selected based on the robust limiting case signals.

Gleason, Nathaniel Jeremy Meyer (Livermore, CA)

2007-12-11T23:59:59.000Z

68

Hazardous Waste Facilities Siting (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facilities Siting (Connecticut) Facilities Siting (Connecticut) Hazardous Waste Facilities Siting (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection These regulations describe the siting and permitting process for hazardous waste facilities and reference rules for construction, operation, closure,

69

NREL: Sustainable NREL - Integrated Biorefinery Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Biorefinery Research Facility Integrated Biorefinery Research Facility A photo of a grey, three-story research facility on a large campus. The Integrated Biorefinery Research Facility The Integrated Biorefinery Research Facility (IBRF) incorporates a large number of energy efficiency and sustainability practices into its cutting-edge design. This facility received a Leadership in Energy and Environmental Design (LEED®) Gold-level certification from the U.S. Green Building Council and supports a variety of advanced biofuels projects and enables researchers and industry partners to develop, test, evaluate, and demonstrate processes for the production of bio-based products and fuels. Fast Facts Cost: $33.5M Square feet: 27,000 Occupants: 32 Labs/Equipment: high-bay biochemical conversion pilot plant that

70

NREL: Hydrogen and Fuel Cells Research - Other Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Other Research Facilities Other Research Facilities In addition to the laboratories dedicated to hydrogen and fuel cell research, other facilities at NREL provide space for scientists developing hydrogen and fuel cell technologies along with other renewable energy technologies. Distributed Energy Resources Test Facility NREL's Distributed Energy Resources (DER) Test Facility is a working laboratory to test and improve interconnections among renewable energy generation technologies, energy storage systems, and electrical conversion equipment. Research being conducted includes improving the system efficiency of hydrogen production by electrolysis using wind or other renewable energy. This research highlights a promising option for encouraging higher penetrations of renewable energy generation as well as

71

Utility Facility Siting and Environmental Protection Act (South Carolina) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Facility Siting and Environmental Protection Act (South Utility Facility Siting and Environmental Protection Act (South Carolina) Utility Facility Siting and Environmental Protection Act (South Carolina) < Back Eligibility Utility Commercial Investor-Owned Utility Industrial Construction Municipal/Public Utility Installer/Contractor Rural Electric Cooperative Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Siting and Permitting Provider South Carolina Public Service Commission This legislation applies to electric generating plants and associated facilities designed for or capable of operation at a capacity of more than 75 MW. A certificate from the Public Service Commission is required prior

72

Independent Oversight Review, Savannah River Site Tritium Facilities -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tritium Tritium Facilities - December 2012 Independent Oversight Review, Savannah River Site Tritium Facilities - December 2012 December 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of preparedness for severe natural phenomena events (NPEs) at the National Nuclear Security Administration (NNSA) Savannah River Site's (SRS's) Tritium Facilities (TF). The HSS Office of Safety and Emergency Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a severe NPE.

73

Guidelines for Applicants for Energy Facility Site Certificates...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Guidelines for Applicants for Energy Facility Site CertificatesPermittingRegulatory...

74

Facilities | Photosynthetic Antenna Research Center  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Danforth Campus Green Labs Initiative which features real-time online energy usage graphs and a network of lab energy representatives. Facilities Ultrafast Laser...

75

On-Site Disposal Facility Inspection Report  

Office of Legacy Management (LM)

8947.1 8947.1 09/13 On-Site Disposal Facility Inspection Report September 2013 6319-D6242 8947.2 09/13 East Face Cell 1 West Face Cell 1 6319D-6208 6319D-6231 8947.3 09/13 North Face Cell 1 North Drainage (looking west) 6319D-6206 6319D-6205 8947.4 09/13 East Face Cell 2 West Face Cell 2 6319D-6230 6319D-6209 8947.5 09/13 East Face Cell 3 West Face Cell 3 6319D-6229 6319D-6210 8947.6 09/13 East Face Cell 4 West Face Cell 4 6319D-6227 6319D-62111 8947.7 09/13 East Face Cell 5 West Face Cell 5 6319D-6226 6319D-6213 8947.8 09/13 East Face Cell 6 6319D-6214 6319D-6225 West Face Cell 6 8947.9 09/13 East Face Cell 7 6319D-6215 6319D-6223 West Face Cell 7 8947.10 09/13 East Face Cell 8 6319D-6217 6319D-6220 West Face Cell 8 8947.11 09/13 South Face Cell 8 6319D-6219 6319D-6218 South Drainage (looking west) 8947.12 09/13

76

In Vivo Radiobioassay and Research Facility  

SciTech Connect

Bioassay monitoring for intakes of radioactive material is an essential part of the internal dosimetry program for radiation workers at the Department of Energys (DOE) Hanford Site. This monitoring program includes direct measurements of radionuclides in the body by detecting photons that exit the body and analyses of radionuclides in excreta samples. The specialized equipment and instrumentation required to make the direct measurements of these materials in the body are located at the In Vivo Radiobioassay and Research Facility (IVRRF). The IVRRF was originally built in 1960 and was designed expressly for the in vivo measurement of radioactive material in Hanford workers. Most routine in vivo measurements are performed annually and special measurements are performed as needed. The primary source terms at the Hanford Site include fission and activation products (primarily 137Cs and 90Sr), uranium, uranium progeny, and transuranic radionuclides. The facility currently houses five shielded counting systems, mens and womens change rooms and an instrument maintenance and repair shop. Four systems include high purity germanium detectors and one system utilizes large sodium iodide detectors. These systems are used to perform an average of 7,000 measurements annually. This includes approximately 5000 whole body measurements analyzed for fission and activation products and 2000 lung measurements analyzed for americium, uranium, and plutonium. Various other types of measurements are performed periodically to estimate activity in wounds, the thyroid, the liver, and the skeleton. The staff maintains the capability to detect and quantify activity in essentially any tissue or organ. The in vivo monitoring program that utilizes the facility is accredited by the Department of Energy Laboratory Accreditation Program for direct radiobioassay.

Lynch, Timothy P.

2011-02-01T23:59:59.000Z

77

Monticello Mill site Federal Facility Agreement, December 22, 1988  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility AgreemPage 1 of 36 : Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility AgreemPage 1 of 36 EM Home | Regulatory Compliance | Environmental Compliance Agreements Monticello (Utah) Site: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility Agreement Pursuant to CERCLA Section 120, December 22, 1988 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VIII and THE STATE OF UTAH DEPARTMENT OF HEALTH and THE UNITED STATES DEPARTMENT OF ENERGY IN THE MATTER: UNITED STATES DEPARTMENT OF ENERGY MONTICELLO (UTAH) SITE: MONTICELLO VICINITY PROPERTIES NPL SITE and MONTICELLO MILLSITE Federal Facility Agreement pursuant to Section 120 of the Comprehensive Environmental Response, Compensation, and ) FEDERAL FACILITY ) AGREEMENT PURSUANT TO

78

Advancing Climate Science with Global Research Facilities | Department...  

Office of Environmental Management (EM)

Advancing Climate Science with Global Research Facilities Advancing Climate Science with Global Research Facilities April 24, 2014 - 3:23pm Addthis This Gulfstream-1 research plane...

79

Monticello Mill site Federal Facility Agreement, December 22, 1988 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monticello Monticello Agreement Name Monticello (Utah) Site: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility Agreement Pursuant to CERCLA Section 120, December 22, 1988 State Utah Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; US EPA; State of Utah Department of Environmental Health Date 12/22/1988 SCOPE * Identify Interim Remedial Action (IRA) alternatives, if any, which are appropriate at the Site prior to the implementation of final remedial actions for the Site. * Evaluate all past investigative and response actions taken at the Site and documented

80

Energy Facility Evaluation, Siting, Construction and Operation (New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Facility Evaluation, Siting, Construction and Operation (New Energy Facility Evaluation, Siting, Construction and Operation (New Hampshire) Energy Facility Evaluation, Siting, Construction and Operation (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Multi-Family Residential Municipal/Public Utility Retail Supplier Rural Electric Cooperative Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State New Hampshire Program Type Siting and Permitting Provider NH Department of Environmental Services, Public Information and Permitting Unit The statute establishes a procedure for the review, approval, monitoring,

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NREL: Photovoltaics Research - Science and Technology Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Science and Technology Facility Science and Technology Facility Photo of the Science and Technology Facility (S&TF) at NREL. NREL's Science and Technology Facility (S&TF) has a sustainable and energy efficient design and will support solar cell, thin film, and nanostructure research. Solar cell, thin film, and nanostructure research are conducted in our Science and Technology Facility (S&TF) with the benefits of a forty percent reduction in energy use compared to standard laboratory buildings; energy recovery for ventilation in laboratories; and functional and flexible laboratory space. Designed specifically to reduce time delays associated with transferring technology to industry, the S&TF's 71,000 square feet is a multi-level facility of laboratory space, office space, and lobby connected by an

82

Breakwater Research Facility | Open Energy Information  

Open Energy Info (EERE)

Breakwater Research Facility Breakwater Research Facility Jump to: navigation, search Basic Specifications Facility Name Breakwater Research Facility Overseeing Organization United States Army Corp of Engineers (ERDC) Hydrodynamic Testing Facility Type Wave Basin Length(m) 121.9 Beam(m) 55.5 Depth(m) 0.8 Water Type Freshwater Cost(per day) Contact POC Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.0 Wave Period Range(s) 0.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking No Simulated Beach No Channel/Tunnel/Flume Channel/Tunnel/Flume None Wind Capabilities Wind Capabilities None Control and Data Acquisition Description Automated data acquisition and control system Cameras None Available Sensors Flow, Pressure Range(psi), Turbulence, Velocity, Wave Probe

83

Flood Fighting Research Facility | Open Energy Information  

Open Energy Info (EERE)

Fighting Research Facility Fighting Research Facility Jump to: navigation, search Basic Specifications Facility Name Flood Fighting Research Facility Overseeing Organization United States Army Corp of Engineers (ERDC) Hydrodynamic Testing Facility Type Wave Basin Length(m) 45.7 Beam(m) 30.5 Depth(m) 1.2 Water Type Freshwater Cost(per day) Contact POC Towing Capabilities Towing Capabilities None Wavemaking Capabilities Wavemaking Capabilities Yes Maximum Wave Height(m) 0.0 Wave Period Range(s) 0.0 Current Velocity Range(m/s) 0.0 Programmable Wavemaking No Simulated Beach No Channel/Tunnel/Flume Channel/Tunnel/Flume None Wind Capabilities Wind Capabilities None Control and Data Acquisition Description Automated data acquisition and control system Cameras Yes Number of Color Cameras 1

84

Idaho Site Launches Startup of Waste Treatment Facility Following Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Launches Startup of Waste Treatment Facility Following Idaho Site Launches Startup of Waste Treatment Facility Following Federal Inspection, DOE Milestone Idaho Site Launches Startup of Waste Treatment Facility Following Federal Inspection, DOE Milestone April 23, 2012 - 12:00pm Addthis A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A view of the interior of the Integrated Waste Treatment Unit. A view of the interior of the Integrated Waste Treatment Unit. A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A view of the interior of the Integrated Waste

85

City of Gainesville- Public Facilities Siting  

Energy.gov (U.S. Department of Energy (DOE))

The City of Gainesville requires the design process for public facilities within city limits to take into consideration current and future solar access. In addition, regulated trees may be removed...

86

Savannah River Sites H Canyon Work Ensures Future Missions for Facility  

Energy.gov (U.S. Department of Energy (DOE))

EM and its primary contractor at the Savannah River Site (SRS) safely completed 16 facility modifications three months ahead of schedule in support of the continued operation and sustainability of the H Canyon facility.

87

NREL's Research Support Facility: An Operations Update - December 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL's Research Support Facility: NREL's Research Support Facility: An Energy Performance Update Shanti Pless- Senior Research Engineer Chad Lobato - Research Engineer Joe Drexler - Chief Engineer for Site Operations and Maintenance Paul Torcellini - Group Manager Ron Judkoff - Principal Program Manager Commercial Buildings Research Group December 2011 Innovation for Our Energy Future Innovation for Our Energy Future 0 20 40 60 80 100 120 140 Old NREL/DOE Leased Office Space Typical Denver Office Building ENERGY STAR 75 Office Building Average LEED Office Building ENERGY STAR 90 Office Building EPA Region 8 Office Denver, CO RSF RSF Renewable Production Annual EUI (kBtu/ft 2 ) Site Mounted PV Roof Mounted PV Data Center Whole Building Energy Efficiency Design Requirements

88

PNNL: Research Aircraft Facility (RAF) - FCSD  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Aircraft Facility (RAF) Research Aircraft Facility (RAF) It is in the mixed layer and free troposphere that most chemical reactions, gas-to-particle transformations, cloud processes, and transport of materials occur. The Pacific Northwest National Laboratory operates the U.S. Department of Energy (DOE) Research Aircraft Facility (RAF) performing airborne research in these areas to serve atmospheric scientists at DOE and other federal, state, and industrial entities. The RAF is dedicated to fulfilling important DOE and national goals in understanding atmospheric processes as they relate to the DOE's environmental missions and the global environment. Central to this facility are the PNNL Grumman Gulfstream 159 (G-1) aircraft, its flight crew, science and engineering technical staff,

89

Montana Major Facility Siting Act (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Montana Major Facility Siting Act (Montana) Montana Major Facility Siting Act (Montana) Montana Major Facility Siting Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Wind Solar Program Info State Montana Program Type Siting and Permitting Provider Montana Department of Environmental Quality The Montana Major Facility Siting Act aims to protect the environment from

90

North Dakota Energy Conversion and Transmission Facility Siting Act (North  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dakota Energy Conversion and Transmission Facility Siting Act Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) North Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Dakota Program Type Line Extension Analysis

91

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

92

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations June 14, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Plateau Remediation Company (509) 376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size wimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition.

93

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations June 14, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Plateau Remediation Company (509) 376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size wimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition.

94

Advanced Powertrain Research Facility Vehicle Test Cell Thermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Powertrain Research Facility Vehicle Test Cell Thermal Upgrade Advanced Powertrain Research Facility Vehicle Test Cell Thermal Upgrade 2010 DOE Vehicle Technologies and Hydrogen...

95

Carbon Fiber Pilot Plant and Research Facilities | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pilot Plant and Research Facilities Carbon Fiber Pilot Plant and Research Facilities 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation...

96

Sandia National Laboratories: Research: Facilities: Gamma Irradiation  

NLE Websites -- All DOE Office Websites (Extended Search)

Gamma Irradiation Facility Gamma Irradiation Facility Photo of Gamma Irradiation Facility The Gamma Irradiation Facility (GIF) provides high-fidelity simulation of nuclear radiation environments for materials and component testing. The low-dose irradiation facility also offers an environment for long-duration testing of materials and electronic components. Such testing may take place over a number of months or even years. Research and other activities The single-structure GIF can house a wide variety of gamma irradiation experiments with various test configurations and at different dose and dose rate levels. Radiation fields at the GIF are produced by high-intensity gamma-ray sources. To induce ionizing radiation effects and damage in test objects, the objects are subjected to high-energy photons from gamma-source

97

Sandia National Laboratories: Research: Facilities: Technology Deployment  

NLE Websites -- All DOE Office Websites (Extended Search)

Shock Thermodynamic Applied Research Facility (STAR) Shock Thermodynamic Applied Research Facility (STAR) The STAR facility, within Sandia's Solid Dynamic Physics Department, is one of a few institutions in the world with a major shock-physics program. This is the only experimental test facility in the world that can cover the full range of pressure (bars to multi-Mbar) for material property study utilizing gas/propellant launchers, ramp-loading pulsers, and ballistic applications. Material Characterization Shock wave experiments are an established technique to determine the equation of state at high pressures and temperature, which can be applied to virtually all materials. This technique allows the probing of the internal structure of the material as it undergoes deformation. This provides a better understanding of the material properties for development

98

NREL: Sustainable NREL - Research Support Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Support Facility Research Support Facility Take a Closer Look RSF Brochure Design-Build Process Booklet Photos Videos Media Contacts Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player Text Version An artist's rendering of an H-shaped building. The rendering includes a key at the bottom with letters A-K that correspond with letters on the building. Each letter, when selected, provides additional information about the building feature. Use the interactive rendering to learn more about the RSF's renewable energy and energy efficiency features and design. The Research Support Facility (RSF) is the laboratory's newest sustainable green building. This 360,000 ft2 Leadership in Energy and Environmental Design (LEED®) Platinum office building is a showcase for energy

99

The Sanford underground research facility at Homestake  

SciTech Connect

The former Homestake gold mine in Lead, South Dakota is being transformed into a dedicated laboratory to pursue underground research in rare-process physics, as well as offering research opportunities in other disciplines such as biology, geology and engineering. A key component of the Sanford Underground Research Facility (SURF) is the Davis Campus, which is in operation at the 4850-foot level (4300 m.w.e) and currently hosts three projects: the LUX dark matter experiment, the MAJORANA DEMONSTRATOR neutrinoless double-beta decay experiment and the CUBED low-background counter. Plans for possible future experiments at SURF are well underway and include long baseline neutrino oscillation experiments, future dark matter experiments as well as nuclear astrophysics accelerators. Facility upgrades to accommodate some of these future projects have already started. SURF is a dedicated facility with significant expansion capability.

Heise, J. [Sanford Underground Research Facility, 630 East Summit Street, Lead, SD 57754 (United States)

2014-06-24T23:59:59.000Z

100

Idaho Site Launches Startup of Waste Treatment Facility Following Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Launches Startup of Waste Treatment Facility Following Launches Startup of Waste Treatment Facility Following Federal Inspection, DOE Milestone Idaho Site Launches Startup of Waste Treatment Facility Following Federal Inspection, DOE Milestone April 23, 2012 - 12:00pm Addthis A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A view of the interior of the Integrated Waste Treatment Unit. A view of the interior of the Integrated Waste Treatment Unit. A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A view of the interior of the Integrated Waste

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Livermore Site Office Facility Representative Program Self-Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARPT-LSO-2011-001 ARPT-LSO-2011-001 Site: Livermore Site Office Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Livermore Site Office Facility Representative Program Self-Assessment Dates of Activity 01/24/2011 - 01/28/2011 Report Preparer Robert Freeman Activity Description/Purpose: This activity report documents the results of the Office of Health, Safety and Security's (HSS) review of and participation in the Livermore Site Office Self-Assessment of the Facility Representative (FR) Program. This self-assessment was led by the U.S. Department of Energy (DOE) Livermore Site Office (LSO) and conducted by LSO staff, HSS staff, National Nuclear Security Administration (NNSA) Office of the Chief of Defense Nuclear Safety (CDNS) staff, a peer from Los Alamos Site

102

Mixed waste disposal facilities at the Savannah River Site  

SciTech Connect

The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE`s Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site`s waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

Wells, M.N.; Bailey, L.L.

1991-12-31T23:59:59.000Z

103

NREL: Hydrogen and Fuel Cells Research - Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterization Laboratory. Photo by Dennis Schroeder, NREL NREL conducts hydrogen and fuel cell R&D at a variety of research facilities at our main 327-acre campus in Golden,...

104

Savannah River Site Federal Facility Agreement, January 15, 1993 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of CERCLA, January 15, 1993 State South Carolina Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts associated with past and present activities at the Savannah River Site are thoroughly investigated and that appropriate response actions are taken to protect the public health, welfare, and the environment. Parties DOE; US EPA; South Carolina Department of Health and Environmental Control (SCDHEC) Date 1/15/1993 SCOPE * Ensure that the environmental impacts associated with past and present activities at the Savannah River Site are thoroughly investigated and that appropriate response actions are taken to protect the public health, welfare, and the environment.

105

Mixed waste disposal facilities at the Savannah River Site  

SciTech Connect

The Savannah River Site (SRS) is a key installation of the US Department of Energy (DOE). The site is managed by DOE's Savannah River Field Office and operated under contract by the Westinghouse Savannah River Company (WSRC). The Site's waste management policies reflect a continuing commitment to the environment. Waste minimization, recycling, use of effective pre-disposal treatments, and repository monitoring are high priorities at the site. One primary objective is to safely treat and dispose of process wastes from operations at the site. To meet this objective, several new projects are currently being developed, including the M-Area Waste Disposal Project (Y-Area) which will treat and dispose of mixed liquid wastes, and the Hazardous Waste/Mixed Waste Disposal Facility (HW/MWDF), which will store, treat, and dispose of solid mixed and hazardous wastes. This document provides a description of this facility and its mission.

Wells, M.N.; Bailey, L.L.

1991-01-01T23:59:59.000Z

106

Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 7, 2011 June 7, 2011 Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility RICHLAND, Wash. - Construction of the largest ground- water treatment facility at the Hanford Site - a major American Recovery and Reinvestment Act project - is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish con- struction of the 200 West Groundwater Treatment Facil- ity this year. Funding for the project comes from the $1.6 billion the Richland Operations Office received from the Recovery Act. The 52,000-square-foot facility will pump contaminated water from the ground, remove contaminants with a combination of treatment technologies, and return clean water to the aquifer. The system will have the capacity to

107

Ultrafast Laser Facility | Photosynthetic Antenna Research Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Ultrafast Laser Facility Ultrafast Laser Facility Click for an Overview of the Ultrafast Laser Facility The PARC Ultrafast Laser Facility, under the direction of Associate Director...

108

Oregon Energy Facility Siting Council | Open Energy Information  

Open Energy Info (EERE)

Energy Facility Siting Council Energy Facility Siting Council Jump to: navigation, search Name Oregon Energy Facility Siting Council Address 625 Marion St. NE Place Salem, Oregon Zip 97301-3737 Year founded 1975 Phone number 503-378-4040 Website http://www.oregon.gov/energy/S Coordinates 44.943987°, -123.032543° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.943987,"lon":-123.032543,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

109

STI Products Produced by Site/Facility Management Contracts | Scientific  

Office of Scientific and Technical Information (OSTI)

Site/Facility Management Contracts Site/Facility Management Contracts Print page Print page Email page Email page In general, site/facility management contracts provide for Government ownership and unlimited rights for the Government for all technical data first produced in the performance of the contract. One exception to the Government's unlimited rights is data for which the contractor has asserted copyright. For scientific and technical articles submitted to and published in journals, symposia proceedings, or similar works, the contractor can assert copyright without prior permission of DOE, but the Government is granted a nonexclusive, paid-up, irrevocable worldwide license to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government (broad license). The

110

Haselden/RNL - Research Support Facility Documentary  

ScienceCinema (OSTI)

The US Department of Energy's (DOE) Research Support Facility (RSF) on the campus of the National Renewable Energy Laboratory is positioned to be one of the most energy efficient buildings in the world. It will demonstrate NREL's role in moving advanced technologies and transferring knowledge into commercial applications. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designed and built.

None

2013-05-29T23:59:59.000Z

111

Atmospheric Radiation Measurement Climate Research Facility (ACRF) Annual Report 2007  

SciTech Connect

This annual report describes the purpose and structure of the program, and presents key accomplishments in 2007. Notable achievements include: Successful review of the ACRF as a user facility by the DOE Biological and Environmental Research Advisory Committee. The subcommittee reinforced the importance of the scientific impacts of this facility, and its value for the international research community. Leadership of the Cloud Land Surface Interaction Campaign. This multi-agency, interdisciplinary field campaign involved enhanced surface instrumentation at the ACRF Southern Great Plains site and, in concert with the Cumulus Humilis Aerosol Processing Study sponsored by the DOE Atmospheric Science Program, coordination of nine aircraft through the ARM Aerial Vehicles Program. Successful deployment of the ARM Mobile Facility in Germany, including hosting nearly a dozen guest instruments and drawing almost 5000 visitors to the site. Key advancements in the representation of radiative transfer in weather forecast models from the European Centre for Medium-Range Weather Forecasts. Development of several new enhanced data sets, ranging from best estimate surface radiation measurements from multiple sensors at all ACRF sites to the extension of time-height cloud occurrence profiles to Niamey, Niger, Africa. Publication of three research papers in a single issue (February 2007) of the Bulletin of the American Meteorological Society.

LR Roeder

2007-12-01T23:59:59.000Z

112

Sandia National Laboratories: Research: Facilities: Technology Deployment  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Deployment Centers Technology Deployment Centers CRF Many of Sandia's unique research centers are available for use by U.S. industry, universities, academia, other laboratories, state and local governments, and the scientific community in general. Technology deployment centers are a unique set of scientific research capabilities and resources. The primary function of technology deployment centers is to satisfy Department of Energy programmatic needs, while remaining accessible to outside users. Contact For more information about Sandia technology deployment centers or for help in selecting a center to meet your needs, contact Mary Monson at mamonso@sandia.gov, (505) 844-3289. Advanced Power Sources Laboratory Combustion Research Facility Design, Evaluation, and Test Technology Facility

113

DOE Programs and Major Site/Facility Contractors | Scientific and Technical  

Office of Scientific and Technical Information (OSTI)

DOE Programs and Major Site/Facility Contractors DOE Programs and Major Site/Facility Contractors Print page Print page Email page Email page DOE Programs and Major Site/Facility Contractors have the option to provide metadata via the Announcement Notice 241.1 web notice, Batch Upload, or Harvesting. The metadata-based announcement notice generated and supplied by DOE and contractors for unclassified STI products includes the basic Dublin Core metadata elements, supplemented by a few DOE data elements, and a minimal number of subelements necessary to further identify the announcement/availability of the STI product. Principal Investigators and Authors A Principal Investigator is designated by a research organization to have an appropriate level of authority and responsibility for the proper conduct of the research, the use of funds, and administrative requirements,

114

Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities. Volume 3  

SciTech Connect

This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km{sup 2} (570-mi{sup 2}) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation.

Coles, G.A.; Shultz, M.V.; Taylor, W.E.

1993-09-01T23:59:59.000Z

115

Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- August 2013  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

116

Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- April 2014  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems

117

GRR/Section 7-MT-a - Energy Facility Siting | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 7-MT-a - Energy Facility Siting GRR/Section 7-MT-a - Energy Facility Siting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-MT-a - Energy Facility Siting 07MTAEnergyFacilitySiting (6).pdf Click to View Fullscreen Contact Agencies Montana Department of Environmental Quality Regulations & Policies Montana Major Facility Siting Act ARM Title 17 Triggers None specified Click "Edit With Form" above to add content 07MTAEnergyFacilitySiting (6).pdf 07MTAEnergyFacilitySiting (6).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Montana Major Facility Siting Act governs the siting of energy facilities in Montana. 7-MT-a.1 to 7-MT-a.2 - Does the Power Plant Have a Production Capacity of

118

Home I Qoehannn Site Facility Cleanup yroject Histow Cleanun  

Office of Legacy Management (LM)

Home Home I Qoehannn Site Facility Cleanup yroject Histow Cleanun Progress Media PowerPoint Robotics Gallem Contacts A view of the Permagrain building from the e Located in northwestern Clearfield County, Quehanna many businesses that have used radiation in their man facility contains residual radioactivity left over from \I for the federal government. Under an approved plan by the federal Nuclear Reeul: responsible regulatory agency, the Commonwealth be; The site now includes operations for PermaGrain Prod manufacturer of specialty wood tile and flooring. 1 Home 1 Histow 1 Cleanun 1 Progress I ( Media 1 PowerPoint I Robotics ( Gallerv 1 Contacts ( Contact Webmaster Last Modified ( I ofl 3s been the location of lcturing processes. The .k conducted decades ag

119

Integrated Biorefinery Research Facility: Advancing Biofuels Technology (Fact Sheet)  

SciTech Connect

The Integrated Biorefinery Research Facility (IBRF) at the National Renewable Energy Laboratory (NREL) expands NREL's cellulosic ethanol research and development and collaboration capabilities.

Not Available

2009-03-01T23:59:59.000Z

120

Facility siting and compensation: Lessons from the Massachusetts experience  

SciTech Connect

In 1980, Massachusetts enacted a unique and comprehensive process for siting hazardous waste facilities. No facility has been constructed or approved since then, however, so it seems appropriate to ask whether the process was fundamentally flawed in concept, implemented imperfectly, or whether some other lesson can be drawn. The authors of this study were closely involved with the legislation at its inception, and Sanderson has stayed involved with it professionally, most recently as manager of the Clean Harbors project. In this essay they combine analysis and memoir to examine the reasons why the Massachusetts siting process has not yet delivered a facility. They argue that the critical factors were both specific design defects of the law itself and general characteristics of the Massachusetts public decisionmaking process. The Massachusetts negotiated compensation model of facility siting is so complicated in practice, and so contingent on local factors, that no one can judge confidently whether it is on the whole hopeless, flawed but correctable, or merely unlucky. We believe its principal liability is that it offers two fatal temptations: to public officials, it appears to offer an alternative to taking leadership risks; and to frightened citizens, it appears to offer a way to avoid, rather than confront and control, physical risks and anxiety. Specific features of the process - its complexity, the inherent delay, the unfortunate design of the siting council - might be corrected with good effect. But we see larger and more pervasive forces as the real obstacle. The NIMBY problem is, at heart, symptomatic of the pessimistic expectations; raising those expectations is not a task that can be accomplished by any legislated decision process. 4 refs., 1 tabs.

O'Hare, M. (Univ. of California, Berkeley (United States)); Sanderson, D. (EIP Associates, San Francisco, CA (United States))

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

File:07TXAEnergyFacilitySiting.pdf | Open Energy Information  

Open Energy Info (EERE)

TXAEnergyFacilitySiting.pdf TXAEnergyFacilitySiting.pdf Jump to: navigation, search File File history File usage Metadata File:07TXAEnergyFacilitySiting.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 30 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:25, 29 July 2013 Thumbnail for version as of 08:25, 29 July 2013 1,275 × 1,650 (30 KB) Abergfel (Talk | contribs) 11:08, 10 June 2013 Thumbnail for version as of 11:08, 10 June 2013 1,275 × 1,650 (30 KB) Apalazzo (Talk | contribs) 11:06, 30 April 2013 Thumbnail for version as of 11:06, 30 April 2013 1,275 × 1,650 (49 KB) Dfitzger (Talk | contribs)

122

Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography  

SciTech Connect

This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

Owen, P.T.; Michelson, D.C.; Knox, N.P.

1985-09-01T23:59:59.000Z

123

DNAPL site evaluation. Research report  

SciTech Connect

Dense nonaqueous-phase liquids (DNAPLs), especially chlorinated solvents, are among the most prevalent subsurface contaminants identified in ground-water supplies and at waste disposal sites. There are several site-characterization issues specific to DNAPL sites including: (a) the risk of inducing DNAPL migration by drilling, pumping or other field activities; (b) the use of special sampling and measurement methods to assess DNAPL presence and migration potential; and (c) development of a cost-effective characterization strategy that accounts for DNAPL chemical transport processes, the risk of inducing DNAPL movement during field work, and the data required to select and implement a realistic remedy. The manual provides information to address these issues and describes and evaluates activities that can be used to determine the presence, fate and transport of subsurface DNAPL contamination.

Cohen, R.M.; Mercer, J.W.

1993-02-01T23:59:59.000Z

124

The US Department of Energy`s facility reuse at the Rocky Flats Environmental Technology Site  

SciTech Connect

This audit was initiated to determine whether the Rocky Flats Environmental Technology Site was maximizing its reuse of excess facilities.

NONE

1998-08-01T23:59:59.000Z

125

SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND CHARACTERISTICS AT NUCLEAR FACILITY SITES  

Energy.gov (U.S. Department of Energy (DOE))

Summary of Revised Tornado, Hurricane and Extreme Straight Wind Characteristics at Nuclear Facility Sites BY: John D. Stevenson Consulting Engineer

126

Argonne Transportation Technology R&D Center - Research Facilities - APRF,  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation Research Facilities Transportation Research Facilities Argonne provides a wide range of facilities and laboratories for conducting cutting-edge transportation research and testing. The facilities offer state-of-the-art equipment and capabilities. APRF Advanced Powertrain Research Facility Battery Post-Test Facility Battery Post-Test Facility Battery testing at the EADL Electrochemical Analysis and Diagnostics Laboratory Engine Research Facility Engine Research Facility Fuel cell research Fuel Cell Test Facility Materials Engineering Research Facility Materials Engineering Research Facility Transportation APS Beamline Transportation Beamline at Argonne's Advanced Photon Source tribology lab Tribology Laboratory TRACC Transportation Research and Analysis Computing Center

127

Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5  

SciTech Connect

This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

1984-09-01T23:59:59.000Z

128

Weldon Spring Site Federal Facility Agreement UNITED STATES ENVIRONMENTAL PROTECTION AGENCY  

Office of Legacy Management (LM)

Site Site Federal Facility Agreement UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VII UNITED STATES DEPARTMENT OF ENERGY MISSOURI DEPARTMENT OF NATURAL RESOURCES IN THE MATTER OF: The United States Department of Energy's Weldon Spring Site, St. Charles, Missouri Docket No. CERCLA-07-2006-0161 FEDERAL FACILITY AGREEMENT FOR THE WELDON SPRING SITE Weldon Spring Site Federal Facility Agreement i TABLE OF CONTENTS I. PRELIMINARY STATEMENT.............................................................................................. 1 II. JURISDICTION ...................................................................................................................... 2 III. PARTIES BOUND .................................................................................................................

129

Style Guide Atmospheric Radiation Measurement (ARM) Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Style Guide Style Guide Atmospheric Radiation Measurement (ARM) Climate Research Facility March 2013 Style Guide Atmospheric Radiation Measurement Climate Research Facility March 2013 Work supported by the U.S. Department of Energy, Office of Science, Office of Biological and Environmental Research March 2013 ii Contents 1.0 Introduction .......................................................................................................................................... 1 2.0 Acronyms and Abbreviations ............................................................................................................... 1 2.1 Usage ............................................................................................................................................ 1

130

Thomas Jefferson National Accelerator Facility Site Tour - Accelerator Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Counting House Free Electron Accelerator Facility Machine Control Center Physics Storage Building North Linear Accelerator South Linear Accelerator VEPCO Substation Machine Control Center Annex Machine Control Center Annex II North Access Building South Access Building Central Helium Liquefier Injector Hall A Truck Ramp Hall B Truck Ramp Hall C Truck Ramp Experimental Hall A Experimental Hall B Experimental Hall C East Arc West Arc Counting House Free Electron Accelerator Facility Machine Control Center Physics Storage Building North Linear Accelerator South Linear Accelerator VEPCO Substation Machine Control Center Annex Machine Control Center Annex II North Access Building South Access Building Central Helium Liquefier Injector Hall A Truck Ramp Hall B Truck Ramp Hall C Truck Ramp Experimental Hall A Experimental Hall B Experimental Hall C East Arc West Arc Science Education Jefferson Lab Jefferson Lab Home Search Jefferson Lab Contact Jefferson Lab Science Education Home Teacher Resources Student Zone Games and Puzzles Science Cinema Programs and Events Search Education Privacy and Security Notice Jefferson Lab Site Tour Guided Tour Site Map Accelerator Area Map Administrative Area Map Tour Index

131

Waste immobilization demonstration program for the Hanford Site`s Mixed Waste Facility  

SciTech Connect

This paper presents an overview of the Waste Receiving and Processing facility, Module 2A> waste immobilization demonstration program, focusing on the cooperation between Hanford Site, commercial, and international participants. Important highlights of the development and demonstration activities is discussed from the standpoint of findings that have had significant from the standpoint of findings that have had significant impact on the evolution of the facility design. A brief description of the future direction of the program is presented, with emphasis on the key aspects of the technologies that call for further detailed investigation.

Burbank, D.A.; Weingardt, K.M.

1994-05-01T23:59:59.000Z

132

GRR/Section 7-HI-b - Renewable Energy Facility Siting Process | Open Energy  

Open Energy Info (EERE)

7-HI-b - Renewable Energy Facility Siting Process 7-HI-b - Renewable Energy Facility Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-HI-b - Renewable Energy Facility Siting Process 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Business, Economic Development, and Tourism Regulations & Policies Hawaii Revised Statutes 201N Hawaii Administrative Rules Title 15, Chapter 36 Triggers None specified Click "Edit With Form" above to add content 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf 07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Error creating thumbnail: Page number not in range.

133

NREL: Wind Research - Site Wind Resource Characteristics  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Wind Resource Characteristics Site Wind Resource Characteristics A graphic showing the location of National Wind Technology Center and its wind power class 2. Click on the image to view a larger version. Enlarge image This graphic shows the wind power class at the National Wind Technology Center. You can download a printable copy. The National Wind Technology Center (NWTC) is on the Great Plains just miles from the Rocky Mountains. The site is flat and covered with short grasses. The terrain and lack of obstructions make the site highly suitable for testing wind turbines. Take a tour of the NWTC and its facilities to better understand its location and layout. Another prime feature of the NWTC is the strong directionality of the wind - most of the strong winds come within a few degrees of 285°. West of

134

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

135

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

136

Sandia National Laboratories: Research: Facilities: Technology Deployment  

NLE Websites -- All DOE Office Websites (Extended Search)

Explosive Components Facility Explosive Components Facility The 98,000 square foot Explosive Components Facility (ECF) is a state-of-the-art facility that provides a full-range of chemical, material, and performance analysis capabilities for energetic materials and explosive components: advanced design of energetic devices and subsystems optical ordnance energetic materials testing of explosives and explosive components and subsystems advanced explosives diagnostics reliability analyses failure modes evaluation safety evaluation The ECF has the full-range of capabilities necessary to support the understanding of energetic materials and components: Optical and Semiconductor Bridge (SCB) Initiation Laboratories Characterization Laboratories thermal properties gas analyses powder characterization

137

The Safety and Tritium Applied Research Facility  

Science Journals Connector (OSTI)

Device, Facility, and Operation / Proceedings of the Sixth International Conference on Tritium Science and Technology Tsukuba, Japan November 12-16, 2001

R. A. Anderl; D. A. Petti; K. A. McCarthy; G. R. Longhurst

138

Engine Research Facility | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

under realistic operating conditions. The facility's engines range in size from automobile- to locomotive-sized, as well as stationary electric power production engines. The...

139

SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

140

ARM - SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Preliminary site studies for critical facilities using geotechnical units derived from engineering geologic analyses  

E-Print Network (OSTI)

be r enamed as the same unit. 12) Using the geotechnical units to define the site's character, determine the most economical and desirable location for the facility within each site, and recommend at least two sites for final consideration... be r enamed as the same unit. 12) Using the geotechnical units to define the site's character, determine the most economical and desirable location for the facility within each site, and recommend at least two sites for final consideration...

Conover, Dale Everette

2012-06-07T23:59:59.000Z

142

Field operations plan for permeability testing in the WIPP-site underground facility  

SciTech Connect

This Field Operations Plan (FOP) describes the objectives, design, equipment, and methodology for permeability tests to be conducted in boreholes drilled from the underground facility currently under construction at the 655-meter depth level at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico into relatively undisturbed portions of the Salado formation. The WIPP is a U. S. Department of Energy research and development facility designed to demonstrate safe disposal of transuranic radioactive wastes resulting from the United States`s defense programs. The testing described in this FOP will be conducted by INTERA Technologies, Inc., under contract to the Earth Sciences Division of Sandia National Laboratories (SNL). The testing program is part of the WIPP-site Hydrogeologic Characterization and Plugging and Sealing programs being conducted by SNL`s Earth Sciences and Experimental Programs Divisions, respectively.

Saulnier, G.J. Jr. [Intera Technologies, Inc., Austin, TX (United States)

1988-08-09T23:59:59.000Z

143

Field operations plan for permeability testing in the WIPP-site underground facility  

SciTech Connect

This Field Operations Plan (FOP) describes the objectives, design, equipment, and methodology for permeability tests to be conducted in boreholes drilled from the underground facility currently under construction at the 655-meter depth level at the Waste Isolation Pilot Plant (WIPP) site in southeastern New Mexico into relatively undisturbed portions of the Salado formation. The WIPP is a U. S. Department of Energy research and development facility designed to demonstrate safe disposal of transuranic radioactive wastes resulting from the United States's defense programs. The testing described in this FOP will be conducted by INTERA Technologies, Inc., under contract to the Earth Sciences Division of Sandia National Laboratories (SNL). The testing program is part of the WIPP-site Hydrogeologic Characterization and Plugging and Sealing programs being conducted by SNL's Earth Sciences and Experimental Programs Divisions, respectively.

Saulnier, G.J. Jr. (Intera Technologies, Inc., Austin, TX (United States))

1988-08-09T23:59:59.000Z

144

Northwestern University Facility for Clean Catalytic Process Research  

SciTech Connect

Northwestern University with DOE support created a Facility for Clean Catalytic Process Research. This facility is designed to further strengthen our already strong catalysis research capabilities and thus to address these National challenges. Thus, state-of-the art instrumentation and experimentation facility was commissioned to add far greater breadth, depth, and throughput to our ability to invent, test, and understand catalysts and catalytic processes, hence to improve them via knowledge-based design and evaluation approaches.

Marks, Tobin Jay [Northwestern University

2013-05-08T23:59:59.000Z

145

Charter for the ARM Climate Research Facility Science Board  

SciTech Connect

The objective of the ARM Science Board is to promote the Nations scientific enterprise by ensuring that the best quality science is conducted at the DOEs User Facility known as the ARM Climate Research Facility. The goal of the User Facility is to serve scientific researchers by providing unique data and tools to facilitate scientific applications for improving understanding and prediction of climate science.

Ferrell, W

2013-03-08T23:59:59.000Z

146

Nuclear Science Research Facilities Nuclear Science User Guide  

E-Print Network (OSTI)

LANSCE User Guide Nuclear Science Research Facilities #12;#12;Nuclear Science User Guide Table of Contents Introduction 3 Nuclear Science Research Facilities 3 The LANSCE Accelerator 4 Time structure techniques 8 Nuclear Science User Program 11 Proposal Process 13 Information for Prospective Users 14

147

Quality Assurance of ARM Program Climate Research Facility Data  

SciTech Connect

This report documents key aspects of the Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) data quality assurance program as it existed in 2008. The performance of ACRF instruments, sites, and data systems is measured in terms of the availability, usability, and accessibility of the data to a user. First, the data must be available to users; that is, the data must be collected by instrument systems, processed, and delivered to a central repository in a timely manner. Second, the data must be usable; that is, the data must be inspected and deemed of sufficient quality for scientific research purposes, and data users must be able to readily tell where there are known problems in the data. Finally, the data must be accessible; that is, data users must be able to easily find, obtain, and work with the data from the central repository. The processes described in this report include instrument deployment and calibration; instrument and facility maintenance; data collection and processing infrastructure; data stream inspection and assessment; the roles of value-added data processing and field campaigns in specifying data quality and haracterizing the basic measurement; data archival, display, and distribution; data stream reprocessing; and engineering and operations management processes and procedures. Future directions in ACRF data quality assurance also are presented.

RA Peppler; KE Kehoe; KL Sonntag; CP Bahrmann; SJ Richardson; SW Christensen; RA McCord; DJ Doty; R Wagener; RC Eagan; JC Lijegren; BW Orr; DL Sisterson; TD Halter; NN Keck; CN Long; MC Macduff; JH Mather; RC Perez; JW Voyles; MD Ivey; ST Moore; DL Nitschke; BD Perkins; DD Turner

2008-03-01T23:59:59.000Z

148

NREL: Biomass Research - Thermochemical Users Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Users Facility Users Facility Text version The state-of-the-art Thermochemical Users Facility (TCUF) consists of several complementary unit operations that can be configured to accommodate the testing and development of various reactors, filters, catalysts, and other unit operations. The TCUF offers clients the capability to test new processes and feedstocks in a timely and cost-effective manner and to quickly and safely obtain extensive performance data on their processes or equipment. The Thermochemical Users Facility contains the following equipment: Thermochemical Process Development Unit The heart of the TCUF is the 0.5-metric-ton-per-day Thermochemical Process Development Unit (TCPDU), which can be operated in either a pyrolysis or gasification mode. The main unit operations in the TCPDU include 8-inch

149

Biomass Gasification Research Facility Final Report  

SciTech Connect

While thermochemical syngas production facilities for biomass utilization are already employed worldwide, exploitation of their potential has been inhibited by technical limitations encountered when attempting to obtain real-time syngas compositional data required for process optimization, reliability, and syngas quality assurance. To address these limitations, the Gas Technology Institute (GTI) carried out two companion projects (under US DOE Cooperative Agreements DE-FC36-02GO12024 and DE-FC36-03GO13175) to develop and demonstrate the equipment and methods required to reliably and continuously obtain accurate and representative on-line syngas compositional data. These objectives were proven through a stepwise series of field tests of biomass and coal gasification process streams. GTI developed the methods and hardware for extractive syngas sample stream delivery and distribution, necessary to make use of state-of-the-art on-line analyzers to evaluate and optimize syngas cleanup and conditioning. The primary objectives of Cooperative Agreement DE-FC36-02GO12024 were the selection, acquisition, and application of a suite of gas analyzers capable of providing near real-time gas analyses to suitably conditioned syngas streams. A review was conducted of sampling options, available analysis technologies, and commercially available analyzers, that could be successfully applied to the challenging task of on-line syngas characterization. The majority of thermochemical process streams comprise multicomponent gas mixtures that, prior to crucial, sequential cleanup procedures, include high concentrations of condensable species, multiple contaminants, and are often produced at high temperatures and pressures. Consequently, GTI engaged in a concurrent effort under Cooperative Agreement DE-FC36-03GO13175 to develop the means to deliver suitably prepared, continuous streams of extracted syngas to a variety of on-line gas analyzers. The review of candidate analysis technology also addressed safety concerns associated with thermochemical process operation that constrain the location and configuration of potential gas analysis equipment. Initial analyzer costs, reliability, accuracy, and operating and maintenance costs were also considered prior to the assembly of suitable analyzers for this work. Initial tests at GTIs Flex-Fuel Test Facility (FFTF) in late 2004 and early 2005 successfully demonstrated the transport and subsequent analysis of a single depressurized, heat-traced syngas stream to a single analyzer (an Industrial Machine and Control Corporation (IMACC) Fourier-transform infrared spectrometer (FT-IR)) provided by GTI. In March 2005, our sampling approach was significantly expanded when this project participated in the U.S. DOEs Novel Gas Cleaning (NGC) project. Syngas sample streams from three process locations were transported to a distribution manifold for selectable analysis by the IMACC FT-IR, a Stanford Research Systems QMS300 Mass Spectrometer (SRS MS) obtained under this Cooperative Agreement, and a Varian micro gas chromatograph with thermal conductivity detector (?GC) provided by GTI. A syngas stream from a fourth process location was transported to an Agilent Model 5890 Series II gas chromatograph for highly sensitive gas analyses. The on-line analyses made possible by this sampling system verified the syngas cleaning achieved by the NGC process. In June 2005, GTI collaborated with Weyerhaeuser to characterize the ChemrecTM black liquor gasifier at Weyerhaeusers New Bern, North Carolina pulp mill. Over a ten-day period, a broad range of process operating conditions were characterized with the IMACC FT-IR, the SRS MS, the Varian ?GC, and an integrated Gas Chromatograph, Mass Selective Detector, Flame Ionization Detector and Sulfur Chemiluminescence Detector (GC/MSD/FID/SCD) system acquired under this Cooperative Agreement from Wasson-ECE. In this field application, a single sample stream was extracted from this low-pressure, low-temperature process and successfully analyzed by these devices. In late 2005,

Snyder, Todd R.; Bush, Vann; Felix, Larry G.; Farthing, William E.; Irvin, James H.

2007-09-30T23:59:59.000Z

150

GRR/Section 7-WA-a - Energy Facility Siting Process | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 7-WA-a - Energy Facility Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-WA-a - Energy Facility Siting Process 7-WA-a - Energy Facility Siting Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Energy Facility Site Evaluation Council Regulations & Policies RCW 80.50.60(1) WAC 463-60 RCW 80.50.090(2) WAC 463-30-270 WAC 463-30-320 Triggers None specified Under RCW 80.50.60(1) a developer may not begin construction of a new energy facility site until they obtain Energy Facility Siting certification

151

2013 Annual Wastewater Reuse Report for the Idaho National Laboratory Sites Central Facilities Area Sewage Treatment Plant  

SciTech Connect

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Sites Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: Site description Facility and system description Permit required monitoring data and loading rates Status of compliance conditions and activities Discussion of the facilitys environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.

Mike Lewis

2014-02-01T23:59:59.000Z

152

Fermilab | Illinois Accelerator Research Center | Fermilab Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

welders, and extensive on-site equipment. Equipment includes conventional and CNC mills, lathes, wire EDM and water jet, with accuracies of a tenth of a mil. High...

153

NETL- High-Pressure Combustion Research Facility  

SciTech Connect

NETL's High-Pressure Combustion Facility is a unique resource within the National Laboratories system. It provides the test capabilities needed to evaluate new combustion concepts for high-pressure, high-temperature hydrogen and natural gas turbines. These concepts will be critical for the next generation of ultra clean, ultra efficient power systems.

None

2013-07-08T23:59:59.000Z

154

NETL- High-Pressure Combustion Research Facility  

ScienceCinema (OSTI)

NETL's High-Pressure Combustion Facility is a unique resource within the National Laboratories system. It provides the test capabilities needed to evaluate new combustion concepts for high-pressure, high-temperature hydrogen and natural gas turbines. These concepts will be critical for the next generation of ultra clean, ultra efficient power systems.

None

2014-06-26T23:59:59.000Z

155

Final Report - Independent Verification Survey Activities at the Seperations Process Research Unit Sites, Niskayuna, New York  

SciTech Connect

The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

Evan Harpenau

2011-03-15T23:59:59.000Z

156

Determination of DCGL for Site Closure of Nuclear Facility  

SciTech Connect

To measure the degree of radioactive contamination of industrial facilities using depleted uranium as catalysts, and to release the site on this basis, RESRAD 6.21 was used to radiological impact assessment. Samples were taken from 20 points. Among the 20 sampling points, the highest point artificially contaminated (upper and lower part of point 16) was selected, and radiological impact was assessed and assessment and DCGL (Derived concentration guideline level) was computed. As a result, individual doses by nuclide were U-234: 4.162E-03 mSv/yr, U-235: 8.762E-04 mSv/yr, U-238: 2.204E-02 mSv/yr. In addition, the domestic dose standard relating to self-disposal and IAEA TECDOC-855 Clearance levels define the individual dose as 10 {mu}Sv. On this basis DCGL (Derived concentration guideline level) was computed, and it was 6.35E-02 Bq/g for U-238. (authors)

Kim, J.; Shin, S.; Whang, J. [Kyung Hee Univ., Dept. of Nuclear Engineering (Korea, Republic of)

2007-07-01T23:59:59.000Z

157

Summary engineering description of underwater fuel storage facility for foreign research reactor spent nuclear fuel  

SciTech Connect

This document is a summary description for an Underwater Fuel Storage Facility (UFSF) for foreign research reactor (FRR) spent nuclear fuel (SNF). A FRR SNF environmental Impact Statement (EIS) is being prepared and will include both wet and dry storage facilities as storage alternatives. For the UFSF presented in this document, a specific site is not chosen. This facility can be sited at any one of the five locations under consideration in the EIS. These locations are the Idaho National Engineering Laboratory, Savannah River Site, Hanford, Oak Ridge National Laboratory, and Nevada Test Site. Generic facility environmental impacts and emissions are provided in this report. A baseline fuel element is defined in Section 2.2, and the results of a fission product analysis are presented. Requirements for a storage facility have been researched and are summarized in Section 3. Section 4 describes three facility options: (1) the Centralized-UFSF, which would store the entire fuel element quantity in a single facility at a single location, (2) the Regionalized Large-UFSF, which would store 75% of the fuel element quantity in some region of the country, and (3) the Regionalized Small-UFSF, which would store 25% of the fuel element quantity, with the possibility of a number of these facilities in various regions throughout the country. The operational philosophy is presented in Section 5, and Section 6 contains a description of the equipment. Section 7 defines the utilities required for the facility. Cost estimates are discussed in Section 8, and detailed cost estimates are included. Impacts to worker safety, public safety, and the environment are discussed in Section 9. Accidental releases are presented in Section 10. Standard Environmental Impact Forms are included in Section 11.

Dahlke, H.J.; Johnson, D.A.; Rawlins, J.K.; Searle, D.K.; Wachs, G.W.

1994-10-01T23:59:59.000Z

158

I.C. 61-17 - Siting of Certain Electrical Transmission Facilities...  

Open Energy Info (EERE)

7 - Siting of Certain Electrical Transmission Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 61-17 - Siting of...

159

RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)  

SciTech Connect

This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina.

Palmer, E.

1998-10-02T23:59:59.000Z

160

DOE/SC-ARM-13-023 ARM Climate Research Facility ANNUAL REPORT...  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility ANNUAL REPORT - 2013 ARM Climate Research Facility Through the ARM Facility, DOE funded the development of several permanent, highly instrumented ground stations for...

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EA-1106: Explosive Waste Treatment Facility at Site 300, Lawrence Livermore  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

106: Explosive Waste Treatment Facility at Site 300, Lawrence 106: Explosive Waste Treatment Facility at Site 300, Lawrence Livermore National Laboratory, San Joaquin County, California EA-1106: Explosive Waste Treatment Facility at Site 300, Lawrence Livermore National Laboratory, San Joaquin County, California SUMMARY This EA evaluates the environmental impacts of the proposal to build, permit, and operate the Explosive Waste Treatment Facility to treat explosive waste at the U.S. Department of Energy's Lawrence Livermore National Laboratory Experimental Test Site, Site 300. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 16, 1996 EA-1106: Finding of No Significant Impact Explosive Waste Treatment Facility at Site 300, Lawrence Livermore National Laboratory April 16, 1996

162

Sandia National Laboratories: Research: Facilities: Technology Deployment  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Detection Materials Characterization Laboratory Radiation Detection Materials Characterization Laboratory This facility provides assistance to users from federal laboratories, U.S. industry and academia in the following areas: (1) testing and characterizing radiation detector materials and devices; and (2) determining the relationships between the physical properties of the detector materials and the device response. Systems of interest include scintillators and room-temperature semiconductors for detection arrays of x-rays, gamma rays and neutrons. User Support The facility's special capabilities include: low-noise environment to test solid-state detectors for x-ray, gamma-ray, and neutron response mass spectrometry to quantify contaminants in detectors and detector-grade materials photoluminescence and thermally-stimulated current to measure

163

Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSS-2011-04-28 NNSS-2011-04-28 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit Dates of Activity: 04/25/2011 - 04/28/2011 Report Preparer William Macon Activity Description/Purpose: In coordination with the National Nuclear Security Administration (NNSA) Service Center, the Office of Health, Safety and Security (HSS) site lead participated in a pre-visit for the NNSA Operational Readiness Review (ORR) of the Joint Actinide Shock Physics Experimental Research (JASPER) facility restart conducted April 25-28, 2011. The site lead also participated

164

Cold neutron research facility at the Budapest Neutron Centre  

Science Journals Connector (OSTI)

The new cold neutron research facility has been routinely operated at the Budapest Neutron Centre (BNC) since February 2001. This ... of equipment consists of a liquid hydrogen cold neutron source, an optimised s...

L. Rosta

2002-12-01T23:59:59.000Z

165

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

166

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

167

Sandia National Laboratories: Research: Facilities: Technology...  

NLE Websites -- All DOE Office Websites (Extended Search)

Weapon and Force Protection Center Video Cameras Weapon and Force Protection Center The Center for Security Systems is a fully integrated research-to- development-to-application...

168

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

169

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

170

Cost-Efficient Work Rids Paducah Site of Old Facilities | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cost-Efficient Work Rids Paducah Site of Old Facilities Cost-Efficient Work Rids Paducah Site of Old Facilities Cost-Efficient Work Rids Paducah Site of Old Facilities April 25, 2012 - 12:00pm Addthis Old trailers that had sat for decades in the southwestern part of the Paducah site were cut up and placed in containers so that the debris could be placed in the site’s industrial landfill. Old trailers that had sat for decades in the southwestern part of the Paducah site were cut up and placed in containers so that the debris could be placed in the site's industrial landfill. Workers cut up old trailers and placed them in containers so that the debris could be placed in the site’s industrial landfill. Workers cut up old trailers and placed them in containers so that the debris could be placed in the site's industrial landfill.

171

Major Facility Siting Program - Circular 2 | Open Energy Information  

Open Energy Info (EERE)

included in a linear facility application; including but not limited to: the need for the transmission line or pipeline, the proposed location, baseline data and reasonable...

172

Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site  

SciTech Connect

DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed.

NONE

1995-07-01T23:59:59.000Z

173

EIS-0385: Ancillary Facilities for the Richton Site of the Strategic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

85: Ancillary Facilities for the Richton Site of the 85: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi EIS-0385: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi Overview DOE announced the cancellation of a supplemental environmental impact statement for certain facilities associated with the 2007 selection of Richton, Mississippi, as the location of a new storage site for expanding the Strategic Petroleum Reserve. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download September 9, 2011 EIS-0385-S1: Notice of Cancellation of a Supplemental Environmental Impact Statement Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi March 21, 2008

174

DOE Site List  

Office of Environmental Management (EM)

Links Links Central Internet Database CID Photo Banner DOE Site List Site Geo Site Code State Operations Office1 DOE Programs Generating Streams at Site DOE Programs Managing Facilities Associated Data2 Acid/Pueblo Canyons ACPC NM Oak Ridge Waste/Media, Facilities Airport Substation CA Western Area Power Administration Facilities Akron Hill Communication Site CO Western Area Power Administration Facilities Akron Substation CO Western Area Power Administration Facilities AL Complex NM Albuquerque DP Facilities Alba Craft ALCL OH Oak Ridge Facilities Albany Research Center AMRC OR Oak Ridge Facilities Alcova Switchyard WY Western Area Power Administration Facilities Aliquippa Forge ALFO PA Oak Ridge Facilities

175

Biomass Gasification Research Facility Final Report  

SciTech Connect

While thermochemical syngas production facilities for biomass utilization are already employed worldwide, exploitation of their potential has been inhibited by technical limitations encountered when attempting to obtain real-time syngas compositional data required for process optimization, reliability, and syngas quality assurance. To address these limitations, the Gas Technology Institute (GTI) carried out two companion projects (under US DOE Cooperative Agreements DE-FC36-03GO13175 and DE-FC36-02GO12024) to develop and demonstrate the equipment and methods required to reliably and continuously obtain accurate and representative on-line syngas compositional data. These objectives were proven through a stepwise series of field tests of biomass and coal gasification process streams. GTI developed the methods and hardware for extractive syngas sample stream delivery and distribution, necessary to make use of state-of-the-art on-line analyzers to evaluate and optimize syngas cleanup and conditioning. This multi-year effort to develop methods to effectively monitor gaseous species produced in thermochemical process streams resulted in a sampling and analysis approach that is continuous, sensitive, comprehensive, accurate, reliable, economical, and safe. The improved approach for sampling thermochemical processes that GTI developed and demonstrated in its series of field demonstrations successfully provides continuous transport of vapor-phase syngas streams extracted from the main gasification process stream to multiple, commercially available analyzers. The syngas stream is carefully managed through multiple steps to successfully convey it to the analyzers, while at the same time bringing the stream to temperature and pressure conditions that are compatible with the analyzers. The primary principle that guides the sample transport is that throughout the entire sampling train, the temperature of the syngas stream is maintained above the maximum condensation temperature of the vapor phase components of the conveyed sample gas. In addition, to minimize adsorption or chemical changes in the syngas components prior to analysis, the temperature of the transported stream is maintained as hot as is practical, while still being cooled only as much necessary prior to entering the analyzer(s). The successful transport of the sample gas stream to the analyzer(s) is accomplished through the managed combination of four basic gas conditioning methods that are applied as specifically called for by the process conditions, the gas constituent concentrations, the analyzer requirements, and the objectives of the syngas analyses: 1) removing entrained particulate matter from the sample stream; 2) maintaining the temperature of the sample gas stream; 3) lowering the pressure of the sample gas stream to decrease the vapor pressures of all the component vapor species in the sample stream; and 4) diluting the gas stream with a metered, inert gas, such as nitrogen. Proof-of-concept field demonstrations of the sampling approach were conducted for gasification process streams from a black liquor gasifier, and from the gasification of biomass and coal feedstocks at GTIs Flex-Fuel Test Facility. In addition to the descriptions and data included in this Final Report, GTI produced a Special Topical Report, Design and Protocol for Monitoring Gaseous Species in Thermochemical Processes, that explains and describes in detail the objectives, principles, design, hardware, installation, operation and representative data produced during this successful developmental effort. Although the specific analyzers used under Cooperative Agreement DE-FC36-02GO12024 were referenced in the Topical Report and this Final Report, the sampling interface design they present is generic enough to adapt to other analyzers that may be more appropriate to alternate process streams or facilities.

Snyder, Todd R.; Bush, Vann; Felix, Larry G.; Farthing, William E.; Irvin, James H.

2007-09-30T23:59:59.000Z

176

Sandia National Laboratories: Research: Facilities: Sandia Pulsed Reactor  

NLE Websites -- All DOE Office Websites (Extended Search)

Sandia Pulsed Reactor Facility - Critical Experiments Sandia Pulsed Reactor Facility - Critical Experiments Sandia scientist John Ford places fuel rods in the Seven Percent Critical Experiment (7uPCX) at the Sandia Pulsed Reactor Facility Critical Experiments (SPRF/CX) test reactor - a reactor stripped down to its simplest form. The Sandia Pulsed Reactor Facility - Critical Experiments (SPRF/CX) provides a flexible, shielded location for performing critical experiments that employ different reactor core configurations and fuel types. The facility is also available for hands-on nuclear criticality safety training. Research and other activities The 7% series, an evaluation of various core characteristics for higher commercial-fuel enrichment, is currently under way at the SPRF/CX. Past critical experiments at the SPRF/CX have included the Burnup Credit

177

ARM Climate Research Facility Annual Report 2004  

SciTech Connect

Like a rock that slowly wears away beneath the pressure of a waterfall, planet earth?s climate is almost imperceptibly changing. Glaciers are getting smaller, droughts are lasting longer, and extreme weather events like fires, floods, and tornadoes are occurring with greater frequency. Why? Part of the answer is clouds and the amount of solar radiation they reflect or absorb. These two factors clouds and radiative transfer represent the greatest source of error and uncertainty in the current generation of general circulation models used for climate research and simulation. The U.S. Global Change Research Act of 1990 established an interagency program within the Executive Office of the President to coordinate U.S. agency-sponsored scientific research designed to monitor, understand, and predict changes in the global environment. To address the need for new research on clouds and radiation, the U.S. Department of Energy (DOE) established the Atmospheric Radiation Measurement (ARM) Program. As part of the DOE?s overall Climate Change Science Program, a primary objective of the ARM Program is improved scientific understanding of the fundamental physics related to interactions between clouds and radiative feedback processes in the atmosphere.

Voyles, J.

2004-12-31T23:59:59.000Z

178

Savannah River Site - Salt Waste Processing Facility Independent Technical Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SALT WASTE PROCESSING FACILITY SALT WASTE PROCESSING FACILITY INDEPENDENT TECHNICAL REVIEW November 22, 2006 Conducted by: Harry Harmon, Team Lead Civil/Structural Sub Team Facility Safety Sub Team Engineering Sub Team Peter Lowry, Lead James Langsted, Lead George Krauter, Lead Robert Kennedy Chuck Negin Art Etchells Les Youd Jerry Evatt Oliver Block Loring Wyllie Richard Stark Tim Adams Tom Anderson Todd LaPointe Stephen Gosselin Carl Costantino Norman Moreau Patrick Corcoran John Christian Ken Cooper Kari McDaniel _____________________________ Harry D. Harmon ITR Team Leader SPD-SWPF-217 SPD-SWPF-217: Salt Waste Processing Facility Independent Technical Review 11/22/2006 ACKNOWLEDGEMENT The ITR Team wishes to thank Shari Clifford of Pacific Northwest National Laboratory for

179

Head of EM Program Tours Hanford Site Facilities | Department...  

Office of Environmental Management (EM)

November 26, 2014 - 12:00pm Addthis EM Office of River Protection (ORP) Manager Kevin Smith, right, discusses the Low-Activity Waste Facility design and construction with Waste...

180

Department of Energy Announces Two Year Pay Freeze on Site and Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Year Pay Freeze on Site and Two Year Pay Freeze on Site and Facility Management Contractor Employees Department of Energy Announces Two Year Pay Freeze on Site and Facility Management Contractor Employees December 17, 2010 - 12:00am Addthis Washington DC - Following President Obama's recent proposal for a two-year pay freeze for all civilian federal workers, U.S. Energy Secretary Steven Chu today announced a decision to stop salary and bonus pool increases for site and facility management contractor employees, who manage day-to-day operations at certain Department of Energy sites and facilities, including national laboratories. "As our nation continues to recover from these challenging economic times, households and small businesses across the country are making sacrifices,"

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

NREL: Sustainable NREL - Media Contacts for the Research Support Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Media Contacts for the Research Support Facility Media Contacts for the Research Support Facility Please refer to these media contacts if you are a member of the media and have questions about the Research Support Facility (RSF). U.S. Department of Energy, Golden Field Office The U.S. Department of Energy (DOE), the owner of the National Renewable Energy Laboratory (NREL), developed the vision for a super energy-efficient office building on the NREL campus that would serve as a model and showcase for what is technologically possible and commercially viable. With this building, DOE leads by example and hopes to spur innovation and replication throughout government and the commercial building sector. John Horst U.S. Department of Energy, Golden Field Office 303-275-4709 Eric Escudero U.S. Department of Energy, Golden Field Office

182

ARM - ARM Climate Research Facility Contributions to International Polar  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Support International Polar Year Begins at ACRF with 3-week Campaign in Barrow Aerosol Affects on Clouds To Be Studied Yearlong Study to Improve Polar Measurements of Radiative Energy Education Efforts Educational Kiosk CD Available at No Cost-Request Yours Today! POLAR-PALOOZA: Climate science goes on tour! Partnership Extends Support for National Science Teacher Conference Teacher's Domain Combines Culture and Climate Other Links ACRF IPY Home U.S. IPY Home ARM Climate Research Facility Contributions to International Polar Year (IPY) The Department of Energy's International Polar Year (IPY) contributions will be conducted at the Atmospheric Radiation Measurement Climate Research Facility (ARM) located in the North Slope of Alaska. This DOE user facility

183

Major Facilities for Materials Research and Related Disciplines  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities for Materials Research and Related Disciplines Major Materials Facilities Committee Commission on Physical Sciences, Mathematics, and Resources National Research Council NATIONAL ACADEMY PRESS Washington, DC 1984 NOTICE: The project that is the subject of this report was approved by the Governing Board of the National Research Council, whose members are drawn from the councils of the National Academy of Sciences, the National Academy of Engineering, and the Institute of Medicine. The members of the committee responsible for the report were chosen for their special competences and with regard for appropriate balance. This report has been reviewed by a group other than the authors according to procedures approved by a Report Review Committee con- sisting of members of the National Academy of Sciences, the National

184

DOE Permitting Hydrogen Facilities: Animation of a Telecommunications Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Animation of a Telecommunications Site Example Layout Animation of a Telecommunications Site Example Layout The animation below provides an example of a telecommunications site layout that uses hydrogen fuel cells for backup power along with some of the codes and standards that apply to such a site. Roll over each of the colored bars below to reveal individual setback requirements, which identify the mandatory separation distances of the site's various components, or select the "Go to Setback Details" button for a chart that summarizes these requirements as defined by the 2006 International Fire Code. Select the "Construction Approval" button for a detailed list of codes and standards related to the construction of a site, or select the "Operation Approval" button for codes and standards related to ongoing operation and

185

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support LANL's security mission DARHT accelerator DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is

186

Lighting Research Group: Facilities: Power Analyzer  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Analyzer Power Analyzer Power Analyzer power analyzer Gonio-photometer | Integrating sphere | Power analyzer | Spectro-radiometer A power analyzer is a very necessary tool for lighting research. With the power analyzer we are able to monitor the input voltage to the lamp as well as the input power and current. The amount of power a lamp or a lamp-ballast combination uses is very important when determining its efficiency. It is also important to monitor the input voltage to make sure it doesn't vary. This can affect the light output of a lamp greatly. With the power analyzer we can also measure things like the power factor, harmonic distortion, and current crest factor of some lamps. These measurements tell us how well a lamp is working. For example, a high power

187

Facility Siting and Layout Optimization Based on Process Safety  

E-Print Network (OSTI)

) that identifies potential layouts by minimizing overall costs. This approach gives the coordinates of each facility in a continuous plane, and estimates for the total length of pipes, the land area, and the selection of safety devices. Finally, the 3D...

Jung, Seungho

2012-02-14T23:59:59.000Z

188

Site Resources, Facilities & Operations Directorate, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Resources Division Site Resources Division Homepage The mission of the Site Resources Division is to enhance the site aesthetic so as to improve staff recruitment and retention, safety, and customer satisfaction, and to support the overall Laboratory mission. To that end, we are dedicated to providing services to the Laboratory at the highest standard per science dollar. The Site Resources Division is responsible for the following: Custodial Services BNL Recycling Program Sanitation Grounds Maintenance, including limited herbicide applications Masonry Operation and maintenance of light and heavy machine equipment, including elevators and emergency generators Rigging & Hoisting Pest control Clean-up of outdoor and select indoor spills Top of Page Last Modified: February 28, 2011

189

Safety Culture And Best Practices At Japan's Fusion Research Facilities  

SciTech Connect

The Safety Monitor Joint Working Group (JWG) is one of the magnetic fusion research collaborations between the US Department of Energy and the government of Japan. Visits by occupational safety personnel are made to participating institutions on a biennial basis. In the 2013 JWG visit of US representatives to Japan, the JWG members noted a number of good safety practices in the safety walkthroughs. These good practices and safety culture topics are discussed in this paper. The JWG hopes that these practices for worker safety can be adopted at other facilities. It is a well-known, but unquantified, safety principle that well run, safe facilities are more productive and efficient than other facilities (Rule, 2009). Worker safety, worker productivity, and high quality in facility operation all complement each other (Mottel, 1995).

Rule, K. [Princeton Plasma Physics Lab., Princeton, NJ (United States); King, M. [General Atomics, San Diego, CA (United States); Takase, Y. [Univ. of Tokyo (Japan); Oshima, Y. [Univ. of Tokyo (Japan); Nishimura, K. [National Institute for Fusion Science, Toki (Japan); Sukegawa, A. [Japan Atomic Energy Agency, Naka (Japan)

2014-04-01T23:59:59.000Z

190

Safety Culture and Best Practices at Japan's Fusion Research Facilities  

SciTech Connect

The Safety Monitor Joint Working Group (JWG) is one of the magnetic fusion research collaborations between the US Department of Energy and the government of Japan. Visits by occupational safety personnel are made to participating institutions on a biennial basis. In the 2013 JWG visit of US representatives to Japan, the JWG members noted a number of good safety practices in the safety walkthroughs. These good practices and safety culture topics are discussed in this paper. The JWG hopes that these practices for worker safety can be adopted at other facilities. It is a well-known, but unquantified, safety principle that well run, safe facilities are more productive and efficient than other facilities (Rule, 2009). Worker safety, worker productivity, and high quality in facility operation all complement each other (Mottel, 1995).

Rule, Keith [PPPL

2014-05-01T23:59:59.000Z

191

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes  

SciTech Connect

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

192

Enterprise Assessments, Hanford Site K-West Annex Facility Constructio...  

Energy Savers (EERE)

of liquid or semi-solid radioactive and chemical waste stored in 177 underground tanks at the Hanford Site. DOE-ORP serves as DOE line management for two functions: the Tank...

193

National Ignition Facility subsystem design requirements NIF site improvements SSDR 1.2.1  

SciTech Connect

This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements associated with the NIF Project Site at Lawrence Livermore National Laboratory (LLNL) at Livermore, California. It identifies generic design conditions for all NIF Project facilities, including siting requirements associated with natural phenomena, and contains specific requirements for furnishing site-related infrastructure utilities and services to the NIF Project conventional facilities and experimental hardware systems. Three candidate sites were identified as potential locations for the NIF Project. However, LLNL has been identified by DOE as the preferred site because of closely related laser experimentation underway at LLNL, the ability to use existing interrelated infrastructure, and other reasons. Selection of a site other than LLNL will entail the acquisition of site improvements and infrastructure additional to those described in this document. This SSDR addresses only the improvements associated with the NIF Project site located at LLNL, including new work and relocation or demolition of existing facilities that interfere with the construction of new facilities. If the Record of Decision for the PEIS on Stockpile Stewardship and Management were to select another site, this SSDR would be revised to reflect the characteristics of the selected site. Other facilities and infrastructure needed to support operation of the NIF, such as those listed below, are existing and available at the LLNL site, and are not included in this SSDR. Office Building. Target Receiving and Inspection. General Assembly Building. Electro- Mechanical Shop. Warehousing and General Storage. Shipping and Receiving. General Stores. Medical Facilities. Cafeteria services. Service Station and Garage. Fire Station. Security and Badging Services.

Kempel, P.; Hands, J.

1996-08-19T23:59:59.000Z

194

UCLA Nanoelectronics Research Facility (NRF) www.nanolab.ucla.edu  

E-Print Network (OSTI)

UCLA Nanoelectronics Research Facility (NRF) www.nanolab.ucla.edu Prof Rob Candler, Director Steve Franz, NRF Manager franz@nanolab.ucla.edu Tel: 310-206-8923 #12;UCLA NRF CHARTER · Establish · Support UCLA's education and community service mission NRF MEMBER PROFILE · ~ 75 Faculty Users · 9

Jalali. Bahram

195

Research Reactors and Radiation Facilities for Joint Use Program  

E-Print Network (OSTI)

Observatory, a facility of the Graduate School of Science of Kyoto University, was constructed in 1968's current main research target is to unveil the origin of the solar magnetic activities that govern science and technology, material science, radiation life science, and radiation medical science

Takada, Shoji

196

Oak Ridge National Laboratory Multiprogram Research Facility (MRF)  

Oak Ridge, TN The Multiprogram Research Facility (MRF) was implemented through a design-build contract, but is a complex mixture of labs and offices that have stringent operational, security, and environmental and energy requirements. The program was highly developed and has detailed technical parameters that could not be compromised.

197

The development of a speaker identification research facility  

E-Print Network (OSTI)

related research today is speaker identification Ll, 4]. Speaker identification is the process of identifying an individual by using only information derived from the person's voice. If speaker identification could be practically implemented, it would...THE DL'VELOPFU:NT Ol A SPEAKER IDENTIFICATION RESEARCH FACILITY A Thesis by DALE PETER RUSPINO Submitted to the Craduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August...

Ruspino, Dale Peter

1974-01-01T23:59:59.000Z

198

Risk management study for the retired Hanford Site facilities. Volume 2, Risk evaluation work procedure for the retired Hanford Site facilities  

SciTech Connect

Risk from retired surplus facilities has always been assumed to be low at the Hanford Site as the facilities are inactive and have few potentials for causing an offsite hazardous material release. However,the fatal accident that occurred in the spring of 1992 in which an employee fell through a deteriorated roof at the 105-F Reactor Building has raised the possibility that retired facilities represent a greater risk than was originally assumed. Therefore, Westinghouse Hanford Company and the US Department of Energy management have determined that facility risk management strategies and programmatic plans should be reevaluated to assure risks are identified and appropriate corrective action plans are developed. To evaluate risk management strategies, accurate risk information about the current and projected condition of the facilities must be developed. This work procedure has been created to address the development of accurate and timely risk information. By using the evaluation results in this procedure, it will be possible to create a prioritized baseline for managing facility risk until all retired surplus facilities are demolished.

Coles, G.A.; Shultz, M.V.; Taylor, W.E.

1993-04-01T23:59:59.000Z

199

Nevada National Security Site-Directed Research  

Office of Scientific and Technical Information (OSTI)

Nevada National Security Nevada National Security Site-Directed Research and Development FY 2010 Report This work was supported by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, under Contract No. DE-AC52-06NA25946. DOE/NV/25946--1162 Report Date: April 2011 SDRD iii Contents Introduction ������������������������������������������������������������������������������������������������������������������������������ v National Security Technologies-Operated Sites ���������������������������������������������������������������� xi

200

New facility an opportunity for UH and you The new John A. Burns School of Medicine and Biomedical Research  

E-Print Network (OSTI)

@hawaii.edu. ma¯lamalama THE LIGHT OF KNOWLEDGE Site of the new medical school and research center, above; Gov, and I look forward to the tremendous impact this facility will have on the medical and economic health of our community. The medical center in Kaka`ako integrates the outstanding teaching and research

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Summary environmental site assessment report for the U.S. Department of Energy Oxnard Facility, Oxnard, California  

SciTech Connect

This report summarizes the investigations conducted by Rust Geotech at the U.S. Department of Energy (DOE) Oxnard facility, 1235 East Wooley Road, Oxnard, California. These investigations were designed to locate, identify, and characterize any regulated contaminated media on the site. The effort included site visits; research of ownership, historical uses of the Oxnard facility and adjacent properties, incidences of and investigations for contaminants on adjacent properties, and the physical setting of the site; sampling and analysis; and reporting. These investigations identified two friable asbestos gaskets on the site, which were removed, and nonfriable asbestos, which will be managed through the implementation of an asbestos management plan. The California primary drinking water standards were exceeded for aluminum on two groundwater samples and for lead in one sample collected from the shallow aquifer underlying the site; remediation of the groundwater in this aquifer is not warranted because it is not used. Treated water is available from a municipal water system. Three sludge samples indicated elevated heavy metals concentrations; the sludge must be handled as a hazardous waste if disposed. Polychlorinated biphenyls (PCBs) were detected at concentrations below remediation criteria in facility soils at two locations. In accordance with U.S. Environmental Protection Agency (EPA) and State of California guidance, remediation of the PCBs is not required. No other hazardous substances were detected in concentrations exceeding regulatory limits.

NONE

1996-02-01T23:59:59.000Z

202

Equipment and Piping Labeling Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EQUIPMENT AND PIPING LABELING EQUIPMENT AND PIPING LABELING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To verify that facility equipment and piping are labeled in a manner such that facility personnel are able to positively identify equipment they operate. To ensure that an effective labeling program is in effect to reduce operator and maintenance errors from incorrect identification of equipment, to increase training effectiveness by tracing the actual facility system as opposed to tracing its schematic, and to reduce personnel exposure to radiation and hazardous materials. This assessment provides a basis for evaluating the effectiveness of the contractor's program for labeling equipment and piping and for establishing compliance

203

Lessons learned -- a comparison of the proposed on-site waste management facilities at the various Department of Energy sites  

SciTech Connect

The Department of Energy Sites (DOE) are faced with the challenge of managing several categories of waste generated from past or future cleanup activities, such as 11(e)2 byproduct material, low-level radioactive (LL), low-level radioactive mixed (LLM), transuranic (TRU), high level radioactive (HL), and hazardous waste (HW). DOE must ensure safe and efficient management of these wastes while complying with all applicable federal and state laws. Proposed waste management strategies for the EM-40 Environmental Restoration (ER) program at these sites indicate that on-site disposal is becoming a viable option. For purposes of this paper, on-site disposal cells managed by the EM-40 program at Hanford, Weldon Spring, Fernald Environmental Management Project (FEMP) and Rocky Flats were compared. Programmatic aspects and design features were evaluated to determine what comparisons can be made, and to identify benefits lessons learned that may be applicable to other sites. Based on comparative analysis, it can be concluded that the DOE EM-40 disposal cells are very unique. Stakeholders played a major role in the decision to locate the various DOE on-site disposal facilities. The disposal cells will be used to manage 11(e)2 by-product materials, LL, LLM, and/or HLW. The analysis further suggests that the design criteria are comparable. Lessons learned relative to the public involvement activities at Weldon Spring, and the design approach at Hanford should be considered when planning future on-site disposal facilities at DOE sites. Further, a detailed analysis of progress made at Hanford should be evaluated for application at sites such as Rocky Flats that are currently planning on-site disposal facilities.

Ciocco, J. [Dept. of Energy, Germantown, MD (United States); Singh, D. [Booz Allen and Hamilton, Germantown, MD (United States); Survochak, S. [DOE RFETS, Golden, CO (United States); Elo, M. [Burns and Roe, Germantown, MD (United States)

1996-12-31T23:59:59.000Z

204

Summary - Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paducah, KY Paducah, KY EM Project: On-Site Disposal Facility ETR Report Date: August 2008 ETR-16 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Proposed On-Site Disposal Facility(OSDF) at the Paducah Gaseous Diffusion Plant Why DOE-EM Did This Review The Paducah Gaseous Diffusion Plant (PGDP) is an active uranium enrichment facility that was placed on the National Priorities List. DOE is required to remediate the PGDP in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). DOE is evaluating alternatives to dispose of waste generated from the remedial activities at the PGDP. One option is to construct an on-site disposal facility (OSDF) meeting the CERCLA requirements.

205

EIS-0385-S1: Ancillary Facilities for the Richton Site of the Strategic Petroleum Reserve, Mississippi  

Energy.gov (U.S. Department of Energy (DOE))

Since selecting the Richton site, DOE has engaged in further consultations with Federal and Mississippi state agencies and is now considering different locations from those addressed in DOE/EIS0385 for certain facilities associated with the Richton SPR expansion site.

206

Chevron facility focused on commercial orifice-meter research  

SciTech Connect

Research to determine the accuracy of commercial orifice meters for custody-transfer measurement has indicated that high-volume gas meters can be flow-proven while in such service. The research further yielded more accurate orifice-meter discharge coefficient equations (at Reynolds numbers greater than 4,000,000) than current equations of the International Standards Organization (ISO) and the American Petroleum Institute (API). These are partial findings of a major study conducted by Chevron Oil Field Research Co. at its Venice, La., calibration facility.

Jones, E.H.; Ferguson, K.R.

1987-07-27T23:59:59.000Z

207

Aarhus University Research Facilities for the Department of Biomedicine  

E-Print Network (OSTI)

underground facilities, including animal facilities. Renovation and conversion of approx. 3,440 m2 laboratory

208

Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610  

SciTech Connect

The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of South Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)

Rosenberger, Kent H. [Savannah River Remediation LLC, Building 705-1C, Aiken, SC 29808 (United States)] [Savannah River Remediation LLC, Building 705-1C, Aiken, SC 29808 (United States)

2013-07-01T23:59:59.000Z

209

Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OH OH EM Project: On-Site Disposal Facility ETR Report Date: February 2008 ETR-12 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Proposed On-Site Waste Disposal Facility (OSWDF) at the Portsmouth Gaseous Diffusion Plant Why DOE-EM Did This Review The On-Site Waste Disposal Facility (OSWDF) is proposed for long-term containment of contaminated materials from the planned Decontamination and Decommissioning (D&D) activities at the Portsmouth Gaseous Diffusion Plant. Acceptable performance of the proposed OSWDF will depend on interactions between engineered landfill features and operations methods that recognize the unique characteristics of the waste stream and site-

210

Hanford Site near-facility environmental monitoring data report for calendar year 1998  

SciTech Connect

This document summarizes the results of the U.S. Department of Energy's Near-Facility Environmental Monitoring program conducted by Waste Management Federal Services of Hanford, Inc. for Fluor Daniel Hanford, Inc. for 1998 in the 100,200/600, and 300/400 Areas of the Hanford Site, in southcentral Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

DIEDIKER, L.P.

1999-07-29T23:59:59.000Z

211

FACET User Facility  

NLE Websites -- All DOE Office Websites

AD SLACPortal > Accelerator Research Division > FACET User Facility AD SLACPortal > Accelerator Research Division > FACET User Facility Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content

212

Design report for the interim waste containment facility at the Niagara Falls Storage Site. [Surplus Facilities Management Program  

SciTech Connect

Low-level radioactive residues from pitchblende processing and thorium- and radium-contaminated sand, soil, and building rubble are presently stored at the Niagara Falls Storage Site (NFSS) in Lewiston, New York. These residues and wastes derive from past NFSS operations and from similar operations at other sites in the United States conducted during the 1940s by the Manhattan Engineer District (MED) and subsequently by the Atomic Energy Commission (AEC). The US Department of Energy (DOE), successor to MED/AEC, is conducting remedial action at the NFSS under two programs: on-site work under the Surplus Facilities Managemnt Program and off-site cleanup of vicinity properties under the Formerly Utilized Sites Remedial Action Program. On-site remedial action consists of consolidating the residues and wastes within a designated waste containment area and constructing a waste containment facility to prevent contaminant migration. The service life of the system is 25 to 50 years. Near-term remedial action construction activities will not jeopardize or preclude implementation of any other remedial action alternative at a later date. Should DOE decide to extend the service life of the system, the waste containment area would be upgraded to provide a minimum service life of 200 years. This report describes the design for the containment system. Pertinent information on site geology and hydrology and on regional seismicity and meteorology is also provided. Engineering calculations and validated computer modeling studies based on site-specific and conservative parameters confirm the adequacy of the design for its intended purposes of waste containment and environmental protection.

Not Available

1986-05-01T23:59:59.000Z

213

Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1  

SciTech Connect

This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

NONE

1994-08-31T23:59:59.000Z

214

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

the website still features the familiar faces of Professor Polar Bear, Teacher Turtle, and PI Prairie Dog (each representing an ARM Climate Research Facility site), but now...

215

Defense Nuclear Facilities Safety Board Review at the Nevada National Security Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSS-2011-001 NNSS-2011-001 Site: Nevada National Security Site Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Defense Nuclear Facilities Safety Board Review at the Nevada National Security Site Dates of Activity 02/14/2011 - 02/17/2011 Report Preparer William Macon Activity Description/Purpose: The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), visited the Nevada Site Office (NSO) and the Nevada National Security Site (NNSS) from February 14-17, 2011. The purpose of the visit was to observe the Defense Nuclear Facilities Safety Board (DNFSB) review and maintain operational awareness of NNSS activities. Result:

216

Atmospheric Radiation Measurement (ARM) Climate Research Facility and Atmospheric  

NLE Websites -- All DOE Office Websites (Extended Search)

Atmospheric Radiation Measurement (ARM) Atmospheric Radiation Measurement (ARM) Climate Research Facility and Atmospheric System Research (ASR) Science and Infrastructure Steering Committee CHARTER June 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not

217

File:07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf | Open Energy  

Open Energy Info (EERE)

HIBRenewableEnergyFacilitySitingProcessREFSP.pdf HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Jump to: navigation, search File File history File usage File:07HIBRenewableEnergyFacilitySitingProcessREFSP.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 124 KB, MIME type: application/pdf, 3 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:39, 27 December 2012 Thumbnail for version as of 16:39, 27 December 2012 1,275 × 1,650, 3 pages (124 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

218

Guide to radiological accident considerations for siting and design of DOE nonreactor nuclear facilities  

SciTech Connect

This guide was prepared to provide the experienced safety analyst with accident analysis guidance in greater detail than is possible in Department of Energy (DOE) Orders. The guide addresses analysis of postulated serious accidents considered in the siting and selection of major design features of DOE nuclear facilities. Its scope has been limited to radiological accidents at nonreactor nuclear facilities. The analysis steps addressed in the guide lead to evaluation of radiological dose to exposed persons for comparison with siting guideline doses. Other possible consequences considered are environmental contamination, population dose, and public health effects. Choices of models and parameters leading to estimation of source terms, release fractions, reduction and removal factors, dispersion and dose factors are discussed. Although requirements for risk analysis have not been established, risk estimates are finding increased use in siting of major nuclear facilities, and are discussed in the guide. 3 figs., 9 tabs.

Elder, J.C.; Graf, J.M.; Dewart, J.M.; Buhl, T.E.; Wenzel, W.J.; Walker, L.J.; Stoker, A.K.

1986-01-01T23:59:59.000Z

219

Summary - Salt Waste Processing Facility Design at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Salt Waste Processing Facility ETR Report Date: November 2006 ETR-4 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Salt Waste Processing Facility Design at the Savannah River Site (SRS) Why DOE-EM Did This Review The Salt Waste Processing Facility (SWPF) is intended to remove and concentrate the radioactive strontium (Sr), actinides, and cesium (Cs) from the bulk salt waste solutions in the SRS high-level waste tanks. The sludge and strip effluent from the SWPF that contain concentrated Sr, actinide, and Cs wastes will be sent to the SRS Defense Waste Processing Facility (DWPF), where they will be vitrified. The decontaminated salt solution (DSS) that is left after removal of the highly

220

Environmental Assessment for the new Whole Body Counter facility at the Savannah River Site  

SciTech Connect

The U.S. Department of Energy proposes to construct and operate a new in-vivo counting facility at the Savannah River Site for the monitoring of employees for internal radionuclides. The proposed facility, titled the new Whole Body Counter (WBC) facility, would house both the existing and additional new invivo counting equipment and facility support operations. The proposed facility would be sited and located in an area of the SRS in which background radiation levels are sufficiently low to assure accurate in-vivo counts and a location that would assure ease of access for occupational workers. This Environmental Assessment has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CPR Parts 1500-1508). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. The proposed action has independent utility to the Savannah River operations and will be necessary to support plant activities regardless of the makeup of the future mission at the site. As such, the proposed new WBC facility is treated as part of the preliminary Reconfiguration Programmatic Environmental Impact Statement ``No Action`` alternative.

Not Available

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Engineering Facilities Having the facilities to develop and test spacecraft on-site is a  

E-Print Network (OSTI)

concerning the level of allowable contamination for space-bound products. LASP's four on-site cleanrooms. Cleanroom standards are federally and internationally regulated and designated by class, which for Standardization (ISO) Class-5 cleanroom has at most 100,000 particles bigger than a half micron per cubic meter

Mojzsis, Stephen J.

222

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAINTENANCE MAINTENANCE Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of

223

Advanced Test Reactor National Scientific User Facility: Addressing advanced nuclear materials research  

SciTech Connect

The Advanced Test Reactor National Scientific User Facility (ATR NSUF), based at the Idaho National Laboratory in the United States, is supporting Department of Energy and industry research efforts to ensure the properties of materials in light water reactors are well understood. The ATR NSUF is providing this support through three main efforts: establishing unique infrastructure necessary to conduct research on highly radioactive materials, conducting research in conjunction with industry partners on life extension relevant topics, and providing training courses to encourage more U.S. researchers to understand and address LWR materials issues. In 2010 and 2011, several advanced instruments with capability focused on resolving nuclear material performance issues through analysis on the micro (10-6 m) to atomic (10-10 m) scales were installed primarily at the Center for Advanced Energy Studies (CAES) in Idaho Falls, Idaho. These instruments included a local electrode atom probe (LEAP), a field-emission gun scanning transmission electron microscope (FEG-STEM), a focused ion beam (FIB) system, a Raman spectrometer, and an nanoindentor/atomic force microscope. Ongoing capability enhancements intended to support industry efforts include completion of two shielded, irradiation assisted stress corrosion cracking (IASCC) test loops, the first of which will come online in early calendar year 2013, a pressurized and controlled chemistry water loop for the ATR center flux trap, and a dedicated facility intended to house post irradiation examination equipment. In addition to capability enhancements at the main site in Idaho, the ATR NSUF also welcomed two new partner facilities in 2011 and two new partner facilities in 2012; the Oak Ridge National Laboratory, High Flux Isotope Reactor (HFIR) and associated hot cells and the University California Berkeley capabilities in irradiated materials analysis were added in 2011. In 2012, Purdue Universitys Interaction of Materials with Particles and Components Testing (IMPACT) facility and the Pacific Northwest Nuclear Laboratory (PNNL) Radiochemistry Processing Laboratory (RPL) and PIE facilities were added. The ATR NSUF annually hosts a weeklong event called Users Week in which students and faculty from universities as well as other interested parties from regulatory agencies or industry convene in Idaho Falls, Idaho to see presentations from ATR NSUF staff as well as select researchers from the materials research field. Users week provides an overview of current materials research topics of interest and an opportunity for young researchers to understand the process of performing work through ATR NSUF. Additionally, to increase the number of researchers engaged in LWR materials issues, a series of workshops are in progress to introduce research staff to stress corrosion cracking, zirconium alloy degradation, and uranium dioxide degradation during in-reactor use.

John Jackson; Todd Allen; Frances Marshall; Jim Cole

2013-03-01T23:59:59.000Z

224

Research Site Locations for Current EERE Postdoctoral Awards...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Research Site Locations for Current and Former EERE Postdoctoral Awards EERE: VTO - Red Leaf PNG Image EERE: VTO - Hybrid Bus PNG Image...

225

DOE - Office of Legacy Management -- Ames Laboratory Research...  

Office of Legacy Management (LM)

Ames Laboratory Research Reactor Facility - IA 03 FUSRAP Considered Sites Site: Ames Laboratory Research Reactor Facility (IA.03) Designated Name: Alternate Name: Location:...

226

Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility- January 2012  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility Fire Suppression Vital Safety System

227

Hydrogeologic investigation of the Advanced Coal Liquefaction Research and Development Facility, Wilsonville, Alabama  

SciTech Connect

This document describes the geology and hydrogeology at the former Advanced Coal Liquefaction Research and Development (ACLR&D) facility in Wilsonville, Alabama. The work was conducted by personnel from the Oak Ridge National Laboratory Grand Junction office (ORNL/GJ) for the U.S. Department of Energy (DOE) Pittsburgh Energy Technology Center (PETC). Characterization information was requested by PETC to provide baseline environmental information for use in evaluating needs and in subsequent decision-making for further actions associated with the closeout of facility operations. The hydrogeologic conceptual model presented in this report provides significant insight regarding the potential for contaminant migration from the ACLR&D facility and may be useful during other characterization work in the region. The ACLR&D facility is no longer operational and has been dismantled. The site was characterized in three phases: the first two phases were an environmental assessment study and a sod sampling study (APCO 1991) and the third phase the hydraulic assessment. Currently, a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial investigation (RI) to address the presence of contaminants on the site is underway and will be documented in an RI report. This technical memorandum addresses the hydrogeologic model only.

Gardner, F.G.; Kearl, P.M.; Mumby, M.E.; Rogers, S.

1996-09-01T23:59:59.000Z

228

Deep Borehole Disposal Research: Demonstration Site Selection...  

Office of Environmental Management (EM)

Site Selection Guidelines, Borehole Seals Design, and RD&D Needs The U.S. Department of Energy has been investigating deep borehole disposal as one alternative for the disposal...

229

DOE/SC-ARM-12-023 ARM Climate Research Facility AnnuAl RepoRt - 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

2-023 2-023 ARM Climate Research Facility AnnuAl RepoRt - 2012 New Climate Measurement Sites h ?QOPQK?* ? * - " ?q " *"- ?l *?G qlH?b " * ?q ?e " "* ? ? - " ?*"-? "?- *"- ? "* Y? ? "? ql?l- " ?e " "* ? - ? ? * ? - *? *?n " *- K? K? ? ? "? ? "* ?- ?f "- ?h ? " ?* ? - M?? ? "? "* ? ? ?*-? ?- *"- ? ?* ? ?- ?QOPRK? ?* ?"" ? -" ? ql ? " *" ? "* ?- ? *? " * ?- *"- ? " "*" ? - ?* ?"- M??o - - ?" * * *"- ? - ?* ?*"-? "* ?" Y

230

E-Print Network 3.0 - accident research facilities Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

1. Report No. Summary: and Transportation Officials (1999) Guide to the Development of Bicycle Facilities. This research was undertaken... . The research also included a review of...

231

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Atmospheric Radiation Measurement Program Climate Research Facility Operations Quarterly Report January 1-March 31, 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

232

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report October 1-December 31, 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

233

Atmospheric Radiation Measurement Program Climate Research Facility Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report January 1-March 31, 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

234

Review of the Facility Representative Program at the Idaho Site, March 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the Facility Representative Program at the Idaho Site March 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................. ! 2.0 Scope ..................................................................................................................................................... ! 3.0 Background ........................................................................................................................................... 1 4.0 Results ..................................................................................................................................................

235

EIS-0364: Decommissioning of the Fast Flux Test Facility, Hanford Site, Richland, WA  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA), on proposed decommissioning of the Fast Flux Test Facility (FFTF) at the Hanford Site, Richland, Washington.

236

Optimal Siting of Regional Fecal Sludge Treatment Facilities: St. Elizabeth, Jamaica  

E-Print Network (OSTI)

for rural wastewater treatment. However, there are serious environmental and human health effects associ for wastewater treatment. Fecal sludge FS is defined as the sludge of variable consistency collected from onOptimal Siting of Regional Fecal Sludge Treatment Facilities: St. Elizabeth, Jamaica Ana Martha

Vogel, Richard M.

237

Review of the Facility Representative Program at the Idaho Site, March 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Facility Representative Program at the Idaho Site March 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................. ! 2.0 Scope ..................................................................................................................................................... ! 3.0 Background ........................................................................................................................................... 1 4.0 Results ..................................................................................................................................................

238

EIS-0089: PUREX Plant and Uranium Oxide Plant Facilities, Hanford Site, Richland, Washington  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy developed this statement to evaluate the environmental impacts of resumption of operations of the PUREX/Uranium Oxide facilities at the Hanford Site to produce plutonium and other special nuclear materials for national defense needs.

239

: The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resumption of Criticality Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site OAS-M-13-09 September 2013 Department of Energy Washington, DC 20585 September 30, 2013 MEMORANDUM FOR THE PRINCIPAL DEPUTY ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Resumption of Criticality Experiments Facility Operations at the Nevada National Security Site" BACKGROUND The mission of the Criticality Experiments Facility, located at the Los Alamos National Laboratory (Los Alamos) was to conduct nuclear criticality experiments and hands-on training in nuclear safeguards, criticality safety and emergency response in support of the National

240

DOE/SNL-TTU scaled wind farm technology facility : research opportunities for study of turbine-turbine interaction.  

SciTech Connect

The proposed DOE/Sandia Scaled Wind Farm Technology Facility (SWiFT) hosted by Texas Tech University at Reese Technology Center in Lubbock, TX, will provide a facility for experimental study of turbine-turbine interaction and complex wind farm aerodynamics. This document surveys the current status of wind turbine wake and turbine-turbine interaction research, identifying knowledge and data gaps that the proposed test site can potentially fill. A number of turbine layouts is proposed, allowing for up to ten turbines at the site.

Barone, Matthew Franklin; White, Jonathan

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Biological and Environmental Research User Facilities | U.S. DOE Office of  

Office of Science (SC) Website

BER User Facilities BER User Facilities User Facilities ASCR User Facilities BES User Facilities BER User Facilities FES User Facilities HEP User Facilities NP User Facilities User Facilities Frequently Asked Questions User Facility Science Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 BER User Facilities Print Text Size: A A A RSS Feeds FeedbackShare Page The Biological & Environmental Research program supports the operation of the following national scientific user facilities: William R. Wiley Environmental Molecular Sciences Laboratory (EMSL): External link The mission of the EMSL at the Pacific Northwest National Laboratory (PNNL) External link in Richland, Washington, is to provide integrated experimental and

242

Advanced Scientific Computing Research User Facilities | U.S. DOE Office of  

Office of Science (SC) Website

ASCR User Facilities ASCR User Facilities User Facilities ASCR User Facilities BES User Facilities BER User Facilities FES User Facilities HEP User Facilities NP User Facilities User Facilities Frequently Asked Questions User Facility Science Highlights Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 ASCR User Facilities Print Text Size: A A A RSS Feeds FeedbackShare Page The Advanced Scientific Computing Research program supports the operation of the following national scientific user facilities: Energy Sciences Network (ESnet): External link The Energy Sciences Network, or ESnet External link , is the Department of Energy's high-speed network that provides the high-bandwidth, reliable connections that link scientists at national laboratories, universities and

243

Descriptions of representative contaminated sites and facilities within the DOE complex  

SciTech Connect

The U.S. Department of Energy (DOE) has initiated efforts to prepare a Programmatic Environmental Impact Statement (PEIS) that will analyze the existing environmental restoration and waste management program and evaluate alternatives for an integrated program. The alternatives being evaluated include (1) a {open_quotes}No Action{close_quotes} alternative as required by the National Environmental Policy Act (NEPA), (2) an Applicable, Relevant, and Appropriate Requirements (ARAR)-driven alternative, (3) a land-use-driven alternative, (4) a health-risk-driven alternative, and (5) a combination land-use and health-risk-driven alternative. The analytical approach being taken to evaluate each of these alternatives is to perform a remedial engineering analysis and human health and ecosystem effects analyses on every contaminated site and facility in the DOE complex. One of Pacific Northwest Laboratory`s (PNL) roles in this approach has been to compile the source term and environmental setting data needed to drive each of these analyses. To date, over 10,000 individual contaminated sites and facilities located throughout the DOE complex of installations have been identified and at least some minimal data compiled on each. The PEIS analyses have been appreciably simplified by categorizing all of these contaminated sites and facilities into six broad categories: (1) contaminated buildings, (2) contaminated soils, (3) solid waste sites (e.g., burial grounds), (4) liquid containment structures (e.g., tanks), (5) surface water sites, and (6) contaminated groundwater sites. A report containing a complete description of each of these thousands of contaminated sites and facilities would be tremendously large and unwildy, as would separate reports describing the application of the analytical methodologies to each.

Short, S.M.; Buck, J.W.; Clark, L.L.; Fletcher, J.F.; Glantz, C.S.; Holdren, G.R.; Huesties, L.R.; Williams, M.D. [Pacific Northwest Lab., Richland, WA (United States); Oates, L. [ICF, Richland, WA (United States)] [and others

1994-10-01T23:59:59.000Z

244

Power Plant Research and Siting Program (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Plant Research and Siting Program (Maryland) Power Plant Research and Siting Program (Maryland) Power Plant Research and Siting Program (Maryland) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Siting and Permitting Provider Maryland Department of Natural Resources The Power Plant Research and Siting Act of 1971 established the Power Plant Research Program (PPRP) to evaluate electric generation issues in the state and recommend responsible, long-term solutions. The program manages a consolidated review of all issues related to power generation in Maryland: it reviews applications, evaluates impacts, and recommends conditions for

245

The research bench meets industry: New facility scales up production of  

NLE Websites -- All DOE Office Websites (Extended Search)

Video: Scenes from Argonne's Materials Engineering Research Facility Video: Scenes from Argonne's Materials Engineering Research Facility Scenes from Argonne's Materials Engineering Research Facility Experiments can keep researchers on their feet all day long. Process R&D chemist Kris Pupek moves between fume hoods in the Materials Engineering Research Facility's process research and development lab, while lab-mate Trevor Dzwiniel records data in his notebook. Experiments can keep researchers on their feet all day long. Process R&D chemist Kris Pupek moves between fume hoods in the Materials Engineering Research Facility's process research and development lab, while lab-mate Trevor Dzwiniel records data in his notebook. Argonne material engineer YoungHo Shin prepares a coin cell battery in a glovebox in the Materials Engineering Research Facility. Once it is prepared, the battery can be tested to determine the energy output characteristics of a cathode material for lithium-ion batteries.

246

Implementation Plans for a Systems Microbiology and Extremophile Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

9073 9073 Implementation Plans for a Systems Microbiology and Extremophile Research Facility Summary of a workshop held March 26 th , 2008 Environmental Molecular Sciences Laboratory Richland, WA April 2009 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05- 76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Battelle Memorial Institute, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus,

247

Hazard ranking system evaluation of CERCLA inactive waste sites at Hanford: Volume 2: Engineered-facility sites (HISS data base)  

SciTech Connect

The purpose of this report is to formally document the assessment activities at the US Department of Energy (DOE) Hanford Site. These activities were carried out pursuant to the DOE orders that address the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Program for the cleanup of inactive waste sites. The DOE orders incorporate the US Environmental Protection Agency methodology, which is based on the Superfund Amendments and Reauthorization Act of 1986. This methodology includes: PA/SI, remedial investigation/feasibility study, record of decision, design and implementation of remedial action, operation and monitoring, and verification monitoring. Volume 1 of this report discusses the CERCLA inactive waste-site evaluation process, assumptions, and results of the Hazard Ranking System methodology employed. Volume 2 presents the data on the individual CERCLA engineered-facility sites at Hanford, as contained in the Hanford Inactive Site Surveillance (HISS) Data Base. Volume 3 presents the data on the individual CERCLA unplanned-release sites at Hanford, as contained in the HISS Data Base. 13 refs.

Jette, S.J.; Lamar, D.A.; McLaughlin, T.J.; Sherwood, D.R.; Van Houten, N.C.; Stenner, R.D.; Cramer, K.H.; Higley, K.A.

1988-10-01T23:59:59.000Z

248

HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility Representative Division HOISTING & RIGGING Assessment Plan--NNSA/Nevada Site Office Facility Representative Division : To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001

249

About the Neutron and Nuclear Science Research (WNR) facility...  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Neutron and Nuclear Science (WNR) Facility The Neutron and Nuclear Science (WNR) Facility provides neutron and proton beams and detector arrays for basic, applied,...

250

NREL: Wind Research - Field Test Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Test Sites Field Test Sites Aerial view of the National Wind Technology Center with the Flatiron Mountains in the background NREL's NWTC has numerous test pads available to industry partners for testing wind turbines that range in size from a few hundred kilowatts to several megawatts. PIX 17711. Manufacturers can take advantage of NREL's numerous test pads and the technical expertise of its staff to field test prototypes of small and large wind turbines. Many of the small wind turbines tested at the NWTC are participants in NREL's Small Wind Turbine Independent Test Program. Small and mid-sized turbines field tested at the NWTC include those manufactured by Atlantic Orient Corporation, Bergey Windpower, Southwest Wind Power, Northern Power Systems, Endurance Wind Power Inc., Gaia-Wind Ltd.,

251

ARM Climate Research Facility | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Research » Climate and Research » Climate and Environmental Sciences Division (CESD) » ARM Climate Research Facility Biological and Environmental Research (BER) BER Home About Research Research Abstracts Searchable Archive of BER Highlights External link Biological Systems Science Division (BSSD) Climate and Environmental Sciences Division (CESD) ARM Climate Research Facility Atmospheric System Research (ASR) Program Data Management Earth System Modeling (ESM) Program William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) Integrated Assessment of Global Climate Change Regional & Global Climate Modeling (RGCM) Program Subsurface Biogeochemical Research Terrestrial Carbon Sequestration External link Terrestrial Ecosystem Science Facilities Science Highlights Benefits of BER

252

Decontamination and decommissioning assessment for the Waste Incineration Facility (Building 232-Z) Hanford Site, [Hanford], WA  

SciTech Connect

Building 232-Z is an element of the Plutonium Finishing Plant (PFP) located in the 200 West Area of the Hanford Site. From 1961 until 1972, plutonium-bearing combustible materials were incinerated in the building. Between 1972 and 1983, following shutdown of the incinerator, the facility was used for waste segregation activities. The facility was placed in retired inactive status in 1984 and classified as a Limited Control Facility pursuant to DOE Order 5480.5, Safety of Nuclear Facilities, and 6430.1A, General Design Criteria. The current plutonium inventory within the building is estimated to be approximately 848 grams, the majority of which is retained within the process hood ventilation system. As a contaminated retired facility, Building 232-Z is included in the DOE Surplus Facility Management Program. The objective of this Decontamination and Decommissioning (D&D) assessment is to remove Building 232-Z, thereby elmininating the radiological and environmental hazards associated with the plutonium inventory within the structure. The steps to accomplish the plan objectives are: (1) identifying the locations of the most significant amounts of plutonium, (2) removing residual plutonium, (3) removing and decontaminating remaining building equipment, (4) dismantling the remaining structure, and (5) closing out the project.

Dean, L.N. [Advanced Sciences, Inc., (United States)

1994-02-01T23:59:59.000Z

253

Atmospheric Radiation Measurement Climate Research Facility (ACRF) Annual Report 2008  

SciTech Connect

The Importance of Clouds and Radiation for Climate Change: The Earths surface temperature is determined by the balance between incoming solar radiation and thermal (or infrared) radiation emitted by the Earth back to space. Changes in atmospheric composition, including greenhouse gases, clouds, and aerosols, can alter this balance and produce significant climate change. Global climate models (GCMs) are the primary tool for quantifying future climate change; however, there remain significant uncertainties in the GCM treatment of clouds, aerosol, and their effects on the Earths energy balance. In 1989, the U.S. Department of Energy (DOE) Office of Science created the Atmospheric Radiation Measurement (ARM) Program to address scientific uncertainties related to global climate change, with a specific focus on the crucial role of clouds and their influence on the transfer of radiation in the atmosphere. To reduce these scientific uncertainties, the ARM Program uses a unique twopronged approach: The ARM Climate Research Facility, a scientific user facility for obtaining long-term measurements of radiative fluxes, cloud and aerosol properties, and related atmospheric characteristics in diverse climate regimes; and The ARM Science Program, focused on the analysis of ACRF and other data to address climate science issues associated with clouds, aerosols, and radiation, and to improve GCMs. This report provides an overview of each of these components and a sample of achievements for each in fiscal year (FY) 2008.

LR Roeder

2008-12-01T23:59:59.000Z

254

Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of5 of5 U.S. Department of Energy Subject: Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility - Inspection Criteria, Approach, and Line:~ HS: Rev: Eff. Date: HSS CRAD 45-57 0 January 31,2013 Office of Safety and Emergency Management Evaluations Acting Direc or, Office of Sifety and Emergency Management Evaluations Date: January 31, 2013 Criteria Review and Approach Document LL.v. ~·M Criteria Lead:ife\riew of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility Page 1 of 5 Date: January 31, 2013 1.0 PURPOSE Within the Office of Health, Safety and Security (HSS), the Office of Enforcement and Oversight, Office of Safety and Emergency Management Evaluations (HS-45) mission is to assess the effectiveness of the

255

Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

T T E D S T A T E S O F A M E R I C A D E P A R T M E NT O F E N E R G Y DOE/EIS-0271 Construction & Operation of a Tritium Extraction Facility at the Savannah River Site Department of Energy Savannah River Operations Office Aiken, South Carolina Final Environmental Impact Statement March 1999 DOE/EIS-0271 March 1999 Preface iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement: Construction and Operation of a Tritium Extraction Facility at the Savannah River Site (DOE/EIS-0271) LOCATION: Aiken and Barnwell Counties, South Carolina CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy

256

Finding of No Significant Impact, Consolidated Incineration Facility at the Savannah River Site, Aiken, SC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

92 WL 381301 (F.R.) 92 WL 381301 (F.R.) NOTICES DEPARTMENT OF ENERGY Finding of No Significant Impact, Consolidated Incineration Facility at the Savannah River Site, Aiken, SC Thursday, December 24, 1992 *61402 AGENCY: Department of Energy. ACTION: Finding of no significant impact. SUMMARY: The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA -0400) for the proposed construction and operation of the Consolidated Incineration Facility (CIF) at the Savannah River Site (SRS), Aiken, South Carolina. The CIF would be for the treatment of hazardous, low- level radioactive, and mixed (both hazardous and radioactive) wastes from SRS. Incineration would reduce the volume and toxicity of these wastes. Construction and operation of the

257

Hanford Site near-facility environmental monitoring annual report, calendar year 1997  

SciTech Connect

Near-facility environmental monitoring provides a means to measure the impacts of operations, waste management, and remediation activities on the environment adjacent to facilities and ensure compliance with local, state, and federal environmental regulations. Specifically, near-facility environmental monitoring monitors new and existing sites, processes, and facilities for potential impacts and releases; fugitive emissions and diffuse sources associated with contaminated areas, facilities (both active and those undergoing surveillance and maintenance), and environmental restoration activities. External radiation, ambient air particulates, ground and surface water, soil, sediment, and biota (plants and animals) are sampled or monitored. Parameters include, as appropriate, radionuclides; radiation fields; chemical or physical constituents, such as nitrates; pH; and water temperature. All ambient air results were below the US Department of Energy (DOE) Derived Concentration Guides (DCGs). Groundwater concentrations at the two wells at the 107-N Facility were below both the DOE DCG and US Environmental Protection Agency Interim Drinking Water Standards for gamma emitting radionuclides. Soil and vegetation results were generally within historic ranges and mostly below the Accessible Soil Concentration limits (included in HNF-PRO-454, Inactive Waste Sites) with the exception of one soil sampling location at 1 00 N Area. External radiation fields continued an overall downward trend. Surface water disposal unit samples (water, sediment, and aquatic vegetation) showed radionuclide concentrations below their respective DCG and Accessible Soil Concentration limits. The 100 N Area Columbia river shoreline springs results were below DCGs with the exception of one Sr concentration. More than 4,600 ha (11,300 acres) of radiologically controlled areas were surveyed in 1997, approximately the same as in 1996.

Perkins, C.J.

1998-07-28T23:59:59.000Z

258

Second performance assessment iteration of the Greater Confinement Disposal facility at the Nevada Test Site  

SciTech Connect

The Greater Confinement Disposal (GCD) facility was established in Area 5 at the Nevada Test Site for containment of waste inappropriate for shallow land burial. Some transuranic (TRU) waste has been disposed of at the GCD facility, and compliance of this disposal system with EPA regulation 40 CFR 191 must be evaluated. We have adopted an iterative approach in which performance assessment results guide site data collection, which in turn influences the parameters and models used in performance assessment. The first iteration was based upon readily available data, and indicated that the GCD facility would likely comply with 40 CFR 191 and that the downward flux of water through the vadose zone (recharge) had a major influence on the results. Very large recharge rates, such as might occur under a cooler, wetter climate, could result in noncompliance. A project was initiated to study recharge in Area 5 by use of three environmental tracers. The recharge rate is so small that the nearest groundwater aquifer will not be contaminated in less than 10,000 years. Thus upward liquid diffusion of radionuclides remained as the sole release pathway. This second assessment iteration refined the upward pathway models and updated the parameter distributions based upon new site information. A new plant uptake model was introduced to the upward diffusion pathway; adsorption and erosion were also incorporated into the model. Several modifications were also made to the gas phase radon transport model. Plutonium solubility and sorption coefficient distributions were changed based upon new information, and on-site measurements were used to update the moisture content distributions. The results of the assessment using these models indicate that the GCD facility is likely to comply with all sections of 40 CFR 191 under undisturbed conditions.

Baer, T.A.; Emery, J.N. [GRAM, Inc., Albuquerque, NM (United States); Price, L.L. [Science Applications International Corp., Albuquerque, NM (United States); Olague, N.E. [Sandia National Labs., Albuquerque, NM (United States)

1994-04-01T23:59:59.000Z

259

File:07MTAEnergyFacilitySiting (6).pdf | Open Energy Information  

Open Energy Info (EERE)

MTAEnergyFacilitySiting (6).pdf MTAEnergyFacilitySiting (6).pdf Jump to: navigation, search File File history File usage File:07MTAEnergyFacilitySiting (6).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 72 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:21, 9 January 2013 Thumbnail for version as of 15:21, 9 January 2013 1,275 × 1,650, 2 pages (72 KB) Alevine (Talk | contribs) 13:17, 9 January 2013 Thumbnail for version as of 13:17, 9 January 2013 1,275 × 1,650, 2 pages (71 KB) Alevine (Talk | contribs) 12:15, 1 October 2012 Thumbnail for version as of 12:15, 1 October 2012 1,275 × 1,650 (62 KB) Dklein2012 (Talk | contribs)

260

Site characterization report for the Old Hydrofracture Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

Several Old Hydrofracture Facility (OHF) structures (i.e., Building 7852, the bulk storage bins, the pump house, water tank T-5, and pump P-3) are surplus facilities at Oak Ridge National Laboratory (ORNL) slated for decontamination and decommissioning (D and D). OHF was constructed in 1963 to allow experimentation and operations with an integrated solids storage, handling, mixing, and grout injection facility. It was shut down in 1980 and transferred to ORNL`s Surveillance and Maintenance Program. The hydrofracture process was a unique disposal method that involved injecting waste materials mixed with grout and additives under pumping pressures of 2,000 psi or greater into a deep, low-permeability shale formation. The injected slurry spread along fractures and bedding planes for hundreds of feet from the injection points, forming thin grout sheets (often less than 1/8 in. thick). The grout ostensibly immobilized and solidified the liquid wastes. Site characterization activities were conducted in the winter and spring of 1994 to collect information necessary to plan the D and D of OHF structures. This site characterization report documents the results of the investigation of OHF D and D structures, presenting data from the field investigation and laboratory analyses in the form of a site description, as-built drawings, summary tables of radiological and chemical contaminant concentrations, and a waste volume estimate. 25 refs., 54 figs., 17 tabs.

NONE

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Critical Protection Item classification for a waste processing facility at Savannah River Site  

SciTech Connect

This paper describes the methodology for Critical Protection Item (CPI) classification and its application to the Structures, Systems and Components (SSC) of a waste processing facility at the Savannah River Site (SRS). The WSRC methodology for CPI classification includes the evaluation of the radiological and non-radiological consequences resulting from postulated accidents at the waste processing facility and comparison of these consequences with allowable limits. The types of accidents considered include explosions and fire in the facility and postulated accidents due to natural phenomena, including earthquakes, tornadoes, and high velocity straight winds. The radiological analysis results indicate that CPIs are not required at the waste processing facility to mitigate the consequences of radiological release. The non-radiological analysis, however, shows that the Waste Storage Tank (WST) and the dike spill containment structures around the formic acid tanks in the cold chemical feed area and waste treatment area of the facility should be identified as CPIs. Accident mitigation options are provided and discussed.

Ades, M.J. [Westinghouse Savannah River Co., Aiken, SC (United States); Garrett, R.J. [ABB Government Services, Aiken, SC (United States)

1993-10-01T23:59:59.000Z

262

NASA Space Radiobiology Research Takes Off at New Brookhaven Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

NASA Space Radiobiology Research Takes Off NASA Space Radiobiology Research Takes Off at New Brookhaven Facility Because astronauts are spending more and more time in space, the National Aeronautics and Space Administration is working with Brookhaven and others here on Earth to learn about the possible risks to human beings exposed to space radiation. To study the radiobiological effects using proton and ion beams that simulate the cosmic rays found in space, a new $34-million NASA Space Radiation Laboratory was commissioned at Brookhaven this summer. --by Karen McNulty Walsh and Marsha Belford "TO BOLDLY GO WHERE NO ONE HAS GONE BEFORE"- the motto of the science-fiction saga Star Trek - could just as easily be the motto of America's real-life space explorers. Despite the recent Columbia shuttle tragedy, officials of the National Aeronautics and Space Administration (NASA) have a bold vision for future manned space exploration, which includes the completion of the International Space Station now under construction, and possible future missions to build a Moon outpost, explore near-Earth asteroids, and send astronauts to Mars.

263

Decommissioning and Demolition of a Redundant UK Research Facility at AWE Aldermaston - 12453  

SciTech Connect

The redundant two-storey brick built research facility on the AWE Site at Aldermaston, UK is in the closing stages of decommissioning and demolition. The facility was used for a variety of purposes up to 1995 predominately involving the use of alpha-emitting isotopes. The two main areas of alpha-based contamination have been decommissioned with the removal of hot -boxes and fume cupboards on the ground floor and HEPA filter units and ventilation equipment on the first floor. Many of these activities were undertaken using both airline fed suits, (supplied via a free standing mobile unit), and full face respirators. Asbestos materials were located and cleared from the first floor by specialist contractor. All sections of active drain running from the building to the site active effluent disposal system were removed early in the program using established techniques with specialist monitoring equipment used to provide confidence in the data required for disposal of the decommissioning debris. In particular a dedicated High Resolution Gamma Spectrometer (radioactive materials scanning unit) was utilized to categorise waste drums and wrapped packages. The building has been decommissioned and the monitoring and sampling of the structure was completed in November 2011 - the results demonstrating that the building was clear of contamination in accordance with UK clearance and exemption requirements. The demolition plan was developed and implemented in December with site excavation of foundations and site clearance currently ongoing in preparation for final site backfill activities and project close. A number of useful lessons have been learnt during the operations and are set out at the rear of the main text. (authors)

Pritchard, Paul [Atomic Weapons Establishment, Aldermaston (United Kingdom)

2012-07-01T23:59:59.000Z

264

Site characterization plan overview: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Consultation Draft  

SciTech Connect

The consultation draft of the site characterization plan is a lengthy document that describes in considerable detail the program that will be conducted to characterize the geologic, hydrologic, and other conditions relevant to the suitability of the site for a repository. The overview presented here consists of brief summaries of important topics covered in the consultation draft of the site-characterization plan; it is not a substitute for the site-characterization plan. The arrangement of the overview is similar to that of the plan itself, with brief descriptions of the disposal system -- the site, the repository, and the waste package -- preceding the discussion of the characterization program to be carried out at the Yucca Mountain site. It is intended primarily for the management staff of organizations involved in the DOE`s repository program -- staff who might wish to understand the general scope of the site-characterization program, the activities to be conducted, and the facilities to be constructed rather than the technical details of site characterization. 22 figs., 1 tab.

NONE

1988-01-01T23:59:59.000Z

265

TYPE OF OPERATION R Research & Development T& Facility Type  

Office of Legacy Management (LM)

--____ --____ R Research & Development T& Facility Type 0 Production scale testing a Pilat scale Y-. Bench Scale Process i Theoretical Studies Sample & Analysis 0 Productian 0 Disposal/Storage a Research Organization a Government 0 Other Sponsored i F[fa' tty ------__------__ I Prime 5 Subcontractor 0 Purchase Order a Other information (i.e., cost + fixed fee, unit p CgNTRACTING PERIOD: L.&G , PX& & cx LFkoL ~~~~~~~~~----------_ __ _______ OWNERSH; P: AEC/MED AEC/MED GOVT GOVT CONTRACTOR Cot+ "ACTOR OWNED LEASED ----- -----_ w!ET) C_EtlSLE ~~s!_NE!?~~ z L ACZD -------- - LANDS a BUILDINGS 0 EQUIPMENT u ORE OR RAW MATL FINAL PRODUCT f i ; : ' 0 WASTE .% RESIDLIE q 0 G G &EC/NED INVOLVEtiE?4T AT SITE .--------_------___~~~~~~~-- ,I

266

Niagara Falls Storage Site, Annual site environmental report, Lewiston, New York, Calendar year 1986: Surplus Facilities Management Program (SFMP)  

SciTech Connect

During 1986, the environmental monitoring program was continued at the Niagara Falls Storage Site (NFSS), a US Department of Energy (DOE) surplus facility located in Niagara County, New York, presently used for the interim storage of radioactive residues and contaminated soils and rubble. The monitoring program is being conducted by Bechtel National, Inc. The monitoring program at the NFSS measures radon gas concentrations in air; external gamma radiation levels; and uranium and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, this individual would receive an annual external exposure approximately equivalent to 6% of the DOE radiation protection standard of 100 mrem/yr. By comparison, the incremental dose received from living in a brick house versus a wooden house is 10 mrem/yr above background. The cumulative dose to the population within an 80-km (50-mi) radius of the NFSS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the NFSS is in compliance with the DOE radiation protection standard. 14 refs., 11 figs., 14 tabs.

Not Available

1987-06-01T23:59:59.000Z

267

Monticello NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items  

Office of Legacy Management (LM)

NPL Sites NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items Location Monticello, Utah- DOE Office of Legacy Management field office Date September 27,2006 Attendees David Bird- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Att Kleinrath- U.S. Depmtment of Energy Tim Bartlett- S. M. Stoller Meeting topics and discussion points are summarized separately under the headings that follow. Attaclunent 1 to this report includes the agenda and handout materials provided at the meeting. This report also includes disposal cell and Pond 4 leachate collection data (Attachment 2), quarterly site inspection results (Attachment 3), and project schedule and deliverables through the next two qumters (October 2006 through March 2007). With this

268

Deep Borehole Disposal Research: Demonstration Site Selection Guidelines,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deep Borehole Disposal Research: Demonstration Site Selection Deep Borehole Disposal Research: Demonstration Site Selection Guidelines, Borehole Seals Design, and RD&D Needs Deep Borehole Disposal Research: Demonstration Site Selection Guidelines, Borehole Seals Design, and RD&D Needs The U.S. Department of Energy has been investigating deep borehole disposal as one alternative for the disposal of spent nuclear fuel and other radioactive waste forms, along with research and development for mined repositories in salt, granite, and clay, as part of the used fuel disposition (UFD) campaign. The deep borehole disposal concept consists of drilling a borehole on the order of 5,000 m deep, emplacing waste canisters in the lower part of the borehole, and sealing the upper part of the borehole with bentonite and concrete seals. A reference design of the

269

Chemistry and Metallurgy Research Facility The Los Alamos National Laboratory (LANL) Chemistry and  

E-Print Network (OSTI)

CMR Chemistry and Metallurgy Research Facility The Los Alamos National Laboratory (LANL) Chemistry analytical chemistry and metallurgy. In 1952, the first LANL CMR facility was completed. At that time chemistry and metallurgy. Upgrades to the original CMR were completed in 2002. In 2012, the CMR facility

270

Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506  

SciTech Connect

The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

Beres, Christopher M.; Fort, E. Joseph [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States)] [Cabrera Services, Inc., 473 Silver Lane, East Hartford, CT 06118 (United States); Boyle, James D. [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)] [United States Army Corps of Engineers - Buffalo, 1776 Niagara Street, Buffalo, NY 14207 (United States)

2013-07-01T23:59:59.000Z

271

Microsoft Word - FINAL 7-12-10 Site Visit Report - LANL Radioactive Liquid Waste Facility FCA.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Visit Report Facility Centered Assessment of the Los Alamos National Laboratory Radioactive Liquid Waste Treatment Facility - June 2010 This site visit report documents the results of the Office of Health, Safety and Security's (HSS) review of the Facility Centered Assessment (FCA) of the Los Alamos National Laboratory (LANL) Radioactive Liquid Waste Treatment Facility (RLW). This review, conducted June 9-25, 2010, was sponsored by the U.S. Department of Energy (DOE) Los Alamos Site Office (LASO) and LANL, and conducted jointly by HSS, LASO, and LANL staff. The Office of Environment, Safety and Health Evaluations was the overall lead organization for evaluation of the FCA process with the participation of the LASO Facility Representative assigned to RLW.

272

Proposed On-Site Disposal Facility (OSDF) at the Paducah Gaseous Diffusion Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

i i TABLE OF CONTENTS 1. INTRODUCTION 1 2. LINE OF INQUIRY NO. 1 - Future Uses of the Subtitle D Landfill 2 3. LINE OF INQUIRY NO. 2 - OSDF Siting in a Brownfield Area 3 4. LINE OF INQUIRY NO. 3 - Seismic Issues 4 5. LINE OF INQUIRY NO. 4 - Post-Closure Public Use of the OSDF 5 6. LINE OF INQUIRY NO. 5 - Public Communication Plan 7 7. LINE OF INQUIRY NO. 6 - Baseline Schedule 8 8. RECOMMENDATIONS 8 9. ACKNOWLEDGEMENT 10 10. REFERENCES 10 APPENDIX 11 1 1. INTRODUCTION The Paducah Gaseous Diffusion Plant (PGDP) is an active uranium enrichment facility that is owned by the US Department of Energy (DOE). Uranium enrichment facilities at PGDP are leased to and operated by the United States Enrichment Corporation. In 1994, PGDP was placed

273

NASA Benchmarks Communications Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMUNICATIONS COMMUNICATIONS Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: Lines of authority are clearly defined with clear and open communications existing between all departments and all levels. Criteria: Dialogue exists between personnel involved in engineering/design, operations, maintenance, safety issues, and remedial actions. Personnel within the departments are promptly informed on issues as they occur on a need-to-know basis. Lessons Learned and feedback is encouraged inter-departmentally regarding safety, adequate resources, and processes to enable prompt and effective corrective actions and resolutions for mission accomplishment. Management has an effective and specified chain of communication in both directions between corporate and facility management. (DOE/EH-0135)

274

MONTICELLO NPL SITES Minutes and Action Items of the Federal Facilities Agreement Meeting  

Office of Legacy Management (LM)

Minutes and Action Items of the Federal Facilities Agreement Meeting Minutes and Action Items of the Federal Facilities Agreement Meeting September 16 and 17,2008 Meeting Location U.S. Department of Energy Site Office, Monticello, Utah Meeting Attendees Jalena Dayvault- U.S. Department of Energy Tim Bartlett- S.M. Stoller Todd Moon- S.M. Stoller Linda Sheader- S. M. Stoller Paul Wetherstein- S.M. Stoller Brent Everett- Utah Department of Environmental Quality Duane Mortensen- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Rob Stites- U.S. Environmental Protection Agency (participated by phone) Christina Wilson- U.S. Environmental Protection Agency (participated by phone) Meeting topics and discussion points are summarized under the headings listed below. The agenda and copies of handouts presented during the meeting are attached to this report.

275

Ground Broken for New Job-Creating Accelerator Research Facility at DOE's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ground Broken for New Job-Creating Accelerator Research Facility at Ground Broken for New Job-Creating Accelerator Research Facility at DOE's Fermi National Accelerator Laboratory in Illinois Ground Broken for New Job-Creating Accelerator Research Facility at DOE's Fermi National Accelerator Laboratory in Illinois December 16, 2011 - 11:49am Addthis WASHINGTON, D.C. - Today, ground was broken for a new accelerator research facility being built at the Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. Supported jointly by the state of Illinois and DOE, the construction of the Illinois Accelerator Research Center (IARC) will provide a state-of-the-art facility for research, development and industrialization of particle accelerator technology, and create about 200 high-tech jobs. DOE's Office

276

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program  

SciTech Connect

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

277

DOE/EA-1605: Environmental Assessment for Biomass Cogeneration and Heating Facilities at the Savannah River Site (August 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

605 605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE This page intentionally left blank - i - TABLE OF CONTENTS Page 1.0 INTRODUCTION ...................................................................................................1 1.1 Background and Proposed Action ...............................................................1 1.2 Purpose and Need ........................................................................................4

278

SuperHILAC: Heavy-ion linear accelerator: Summary of capabilities, facilities, operations, and research  

SciTech Connect

This report consists of a description of the accelerator facilities and a review of research programs being conducted there. Lists of SuperHILAC researchers and publications are also given.

McDonald, R.J. (ed.)

1987-09-01T23:59:59.000Z

279

Research Facility Climate change and environmental stresses placed by humans on plants,  

E-Print Network (OSTI)

among biological organisms in air, soil and water, particularly in light of climate and environmental, biodiversity, biotechnologies in medicine and environmental risk management · Provides researchersResearch Facility Climate change and environmental stresses placed by humans on plants, animals

Denham, Graham

280

FACILITIES USE AGREEMENT FOR NON-COLLABORATIVE PROPRIETARY RESEARCH  

E-Print Network (OSTI)

of the __________________________ _______________ instrument facility. These amounts include assistance by NIST staff only in training USER personnel agrees that the personnel it has selected to use or assist in the use of the above-described Facility in FY_______ to reflect actual operating costs for that year. (4) USER agrees to pay for all damages

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

282

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

283

ARRA-funded Cloud Radar Development for the Department of Energy's ARM Climate Research Facility  

E-Print Network (OSTI)

Measurement (ARM) Climate Research Facility, a DOE scientific user facility, for fundamental research, the DOE's Pacific Northwest National Laboratory recently funded ProSensing Inc. of Amherst, Mass. to build Flight Center to build a scanning cloud radar based on the DOE-funded design. We are also competing

284

U.S. Federal Facility Compliance Agreement for the Hanford Site, February 7, 1994 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Radionuclide for Radionuclide NESHAP State Washington Agreement Type Federal Facility Compliance Agreement Legal Driver(s) CAA Scope Summary Bring DOE's Hanford site into compliance with CAA Parties EPA; DOE; Richland Operations Office (RL) Date 02/07/1994 SCOPE * Bring DOE's Hanford site into compliance with CAA. This Compliance Plan contains a schedule for DOE to evaluate the monitoring systems associated with Designated Stacks to ensure that these systems conform to the standards for continuous monitoring systems in 40 Code of Federal Regulations (CFR) Part 61, Subpart H. ESTABLISHING MILESTONES * Beginning 30 days after the effective date of this Agreement, DOE shall submit quarterly progress reports to EPA until the requirements contained in Amendment A

285

Interaction of Sr-90 with site candidate soil for demonstration disposal facility at Serpong  

SciTech Connect

Interaction of radiostrontium (Sr-90) with site candidate soil for demonstration disposal facility to be constructed in the near future at Serpong has been done. This activity is to anticipate the interim storage facility at Serpong nuclear area becomes full off condition, and show to the public how radioactive waste can be well managed with the existing technology. To ensure that the location is save, a reliability study of site candidate soil becomes very importance to be conducted through some experiments consisted some affected parameters such as contact time, effect of ionic strength, and effect of Sr{sup +} ion in solution. Radiostrontium was used as a tracer on the experiments and has role as radionuclide reference in low-level radioactive waste due to its long half-live and it's easy to associate with organism in nature. So, interaction of radiostrontium and soil samples from site becomes important to be studied. Experiment was performed in batch method, and soil sample-solution containing radionuclide was mixed in a 20 ml of PE vial. Ratio of solid: liquid was 10{sup ?2} g/ml. Objective of the experiment is to collect the specific characteristics data of radionuclide sorption onto soil from site candidate. Distribution coefficient value was used as indicator where the amount of initial and final activities of radiostrontium in solution was compared. Result showed that equilibrium condition was reached after contact time 10 days with Kd values ranged from 1600-2350 ml/g. Increased in ionic strength in solution made decreased of Kd value into soil sample due to competition of background salt and radiostrontium into soil samples, and increased in Sr ion in solution caused decreased of Kd value in soil sample due to limitation of sorption capacity in soil samples. Fast condition in saturated of metal ion into soil samples was reached due to a simple reaction was occurred.

Setiawan, Budi, E-mail: bravo@batan.go.id [Radwaste Technology Center-National Nuclear Energy Agency, PUSPIPTEK, Serpong-Tangerang 15310 (Indonesia); Mila, Oktri; Safni [Dept. of Chemistry, Fac. of Math. and Nat. Sci., Andalas University, Kampus Limau Manis, Padang-West Sumatra 25163 (Indonesia)

2014-03-24T23:59:59.000Z

286

Environmental Assessment for the LGF Spill Test Facility at Frenchman Flat, Nevada Test Site  

SciTech Connect

The LGF Spill Test Facility at Frenchman Flat, Nevada Test Site, is being constructed by the United States Department of Energy (DOE). In this Environmental Assessment, environmental consequences of spilling hazardous materials in the Frenchman Flat basin are evaluated and mitigations and recommendations are stated in order to protect natural resources and reduce land-use impacts. Guidelines and restrictions concerning spill-test procedures will be determined by the LGF Test Facility Operations Manager and DOE based on toxicity documentation for the test material, provided by the user, and mitigations imposed by the Environmental Assessment. In addition to Spill Test Facility operational procedures, certain assumptions have been made in preparation of this document: no materials will be considered for testing that have cumulative, long-term persistence in the environment; spill tests will consist of releases of 15 min or less; and sufficient time will be allowed between tests for recovery of natural resources. Geographic limits to downwind concentrations of spill materials were primarily determined from meteorological data, human occupational exposure standards to hazardous materials and previous spill tests. These limits were established using maximum spill scenarios and environmental impacts are discussed as worst case scenarios; however, spill-test series will begin with smaller spills, gradually increasing in size after the impacts of the initial tests have been evaluated.

Patton, S.E.; Novo, M.G.; Shinn, J.H.

1986-04-01T23:59:59.000Z

287

Savannah River Site- Salt Waste Processing Facility: Briefing on the Salt Waste Processing Facility Independent Technical Review  

Energy.gov (U.S. Department of Energy (DOE))

This is a presentation outlining the Salt Waste Processing Facility process, major risks, approach for conducting reviews, discussion of the findings, and conclusions.

288

REVISED FINAL REPORT INDEPENDENT VERIFICATION SURVEY ACTIVITIES AT THE SEPARATIONS PROCESS RESEARCH UNIT SITES, NISKAYUNA, NEW YORK DCN 0496-SR-06-1  

SciTech Connect

The Separations Process Research Unit (SPRU) complex located on the Knolls Atomic Power Laboratory (KAPL) site in Niskayuna, New York, was constructed in the late 1940s to research the chemical separation of plutonium and uranium (Figure A-1). SPRU operated as a laboratory scale research facility between February 1950 and October 1953. The research activities ceased following the successful development of the reduction oxidation and plutonium/uranium extraction processes. The oxidation and extraction processes were subsequently developed for large scale use by the Hanford and Savannah River sites (aRc 2008a). Decommissioning of the SPRU facilities began in October 1953 and continued through the 1990s.

Evan Harpenau

2011-10-10T23:59:59.000Z

289

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS FIGURE S-1 Regional Map of the Portsmouth, Ohio, Site Vicinity Summary S-18 Portsmouth DUF 6 Conversion Final EIS FIGURE S-3 Three Alternative Conversion Facility Locations within the Portsmouth Site, with Location A Being the Preferred Alternative (A representative conversion facility footprint is shown within each location.) Summary S-20 Portsmouth DUF 6 Conversion Final EIS FIGURE S-4 Conceptual Overall Material Flow Diagram for the Portsmouth Conversion Facility Summary S-21 Portsmouth DUF 6 Conversion Final EIS FIGURE S-5 Conceptual Conversion Facility Site Layout for Portsmouth Summary S-25 Portsmouth DUF 6 Conversion Final EIS FIGURE S-6 Potential Locations for Construction of a New Cylinder Storage Yard at Portsmouth

290

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Paducah DUF Paducah DUF 6 Conversion Final EIS FIGURE S-1 Regional Map of the Paducah, Kentucky, Site Vicinity Summary S-18 Paducah DUF 6 Conversion Final EIS FIGURE S-3 Three Alternative Conversion Facility Locations within the Paducah Site, with Location A Being the Preferred Alternative (A representative conversion facility footprint is shown within each location.) Summary S-20 Paducah DUF 6 Conversion Final EIS FIGURE S-4 Conceptual Overall Material Flow Diagram for the Paducah Conversion Facility Summary S-21 Paducah DUF 6 Conversion Final EIS FIGURE S-5 Conceptual Conversion Facility Site Layout for Paducah Summary S-28 Paducah DUF 6 Conversion Final EIS FIGURE S-6 Areas of Potential Impact Evaluated for Each Alternative Alternatives 2-7 Paducah DUF 6 Conversion Final EIS

291

Allowable residual-contamination levels for decommissioning facilities in the 100 areas of the Hanford Site  

SciTech Connect

This report contains the results of a study sponsored by UNC Nuclear Industries to determine Allowable Residual Contamination Levels (ARCL) for five generic categories of facilities in the 100 Areas of the Hanford Site. The purpose of this study is to provide ARCL data useful to UNC engineers in conducting safety and cost comparisons for decommissioning alternatives. The ARCL results are based on a scenario/exposure-pathway analysis and compliance with an annual dose limit for three specific modes of future use of the land and facilities. These modes of use are restricted, controlled, and unrestricted. The information on ARCL values for restricted and controlled use provided by this report is intended to permit a full consideration of decommissioning alternatives. ARCL results are presented both for surface contamination remaining in facilities (in dpm/100 cm/sup 2/), and for unconfined surface and confined subsurface soil conditions (in pCi/g). Two confined soil conditions are considered: contamination at depths between 1 and 4 m, and contamination at depths greater than or equal to 5 m. A set of worksheets are presented in an appendix for modifying the ARCL values to accommodate changes in the radionuclide mixture or concentrations, to consider the impacts of radioactive decay, and to predict instrument responses. Finally, a comparison is made between the unrestricted release ARCL values for the 100 Area facilities and existing decommissioning and land disposal regulations. For surface contamination, the comparison shows good agreement. For soil contamination, the comparison shows good agreement if reasonable modification factors are applied to account for the differences in modeling soil contamination and licensed low-level waste.

Kennedy, W.E. Jr.; Napier, B.A.

1983-07-01T23:59:59.000Z

292

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Aging, Overworked Computer Network at SGP Gets Overhauled Bookmark and Share This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. Established as the first ARM research facility in 1992, the Southern Great Plains (SGP) site in Oklahoma is the "old man on the block" when it comes to infrastructure. Though significant improvements have been made to facilities and equipment throughout the years, the computer network at the

293

Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping and Pipe Supports, September 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site, Salt Waste Processing Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports September 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background .......................................................................................................................................... 1

294

Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping and Pipe Supports, September 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site, Salt Waste Processing Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports September 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background .......................................................................................................................................... 1

295

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2011 [Facility News] 22, 2011 [Facility News] Request for Proposals Now Open Bookmark and Share The ARM Climate Research Facility is now accepting applications for use of an ARM mobile facility (AMF), the ARM aerial facility (AAF), and fixed sites. Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Facility, with availability as follows: AMF2 available December 2013 AMF1 available March 2015 AAF available between June and October 2013 Fixed sites available FY2013 Priority will be given to proposals that make comprehensive use of the ARM facilities and focus on long-term goals of the DOE Office of Biological and Environmental Research. Successful proposals will be supplied all operational and logistical resources (provided at no cost to the principal

296

Joint Assessment of Renewable Energy and Water Desalination Research Center (REWDC) Program Capabilities and Facilities In Radioactive Waste Management  

SciTech Connect

The primary goal of this visit was to perform a joint assessment of the Renewable Energy and Water Desalination Center's (REWDC) program in radioactive waste management. The visit represented the fourth technical and scientific interaction with Libya under the DOE/NNSA Sister Laboratory Arrangement. Specific topics addressed during the visit focused on Action Sheet P-05-5, ''Radioactive Waste Management''. The Team, comprised of Mo Bissani (Team Lead), Robert Fischer, Scott Kidd, and Jim Merrigan, consulted with REWDC management and staff. The team collected information, discussed particulars of the technical collaboration and toured the Tajura facility. The tour included the waste treatment facility, waste storage/disposal facility, research reactor facility, hot cells and analytical labs. The assessment team conducted the first phase of Task A for Action Sheet 5, which involved a joint assessment of the Radioactive Waste Management Program. The assessment included review of the facilities dedicated to the management of radioactive waste at the Tourja site, the waste management practices, proposed projects for the facility and potential impacts on waste generation and management.

Bissani, M; Fischer, R; Kidd, S; Merrigan, J

2006-04-03T23:59:59.000Z

297

Research Highlight  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Climate Research Facility at the Southern Great Plains site to evaluate three major Numerical-Weather-Prediction reanalyses (ERA-Interim, NCEPNCAR Reanalysis I, and NCEPDOE...

298

Argonne Transportation Technology R&D Center - Engine Research Facility and  

NLE Websites -- All DOE Office Websites (Extended Search)

Engine Research Facility Engine Research Facility GM-Fiat 1.9 liter diesel engine test cell GM-Fiat 1.9 Liter Diesel Engine Test Cell Argonne's Engine Research Facility allows scientists and engineers to study in-cylinder combustion and emissions under realistic operating conditions. The size of engines in the facility range from automobile- to locomotive-sized, as well as stationary electric power production engines. Improving Engine Performance, Emissions Argonne researchers would like to find ways to improve engine performance and reliability, increase fuel efficiency, and reduce harmful exhaust emissions. Argonne's goal is to discover and evaluate new technologies to determine their technical feasibility and commercial viability. In addition, Argonne is conducting research on sustainable renewable fuels

299

NASA Benchmarks Lessons Learned Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LESSONS LEARNED LESSONS LEARNED Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established Lessons Learned Program with an effective system to continuously distribute information of improvement in safe operations to all affected personnel. Criteria: Timely and effective action is taken to track and correct identified deficiencies and to prevent their recurrence by addressing their basic causes and related generic problems. (DOE/EH-0135) Management installs an effective corrective action program (caWeb) for safety-related issues, wherein records are updated and actions are tracked through completion. (DOE/EH-0135) Management uses the corrective action program (caWeb) as the database to analyze safety issues, implement corrective actions, and define

300

Confined Spaces Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONFINED SPACES CONFINED SPACES Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: This assessment provides a basis for evaluating the safety effectiveness of the contractor's confined or enclosed spaces procedure, and for establishing compliance with DOE and OSHA requirements. Specifically, this assessment is to verify the information and findings of the BN Management Self Assessment Report on "Confined Space", ES&H-MSA-03-13, dated December 31, 2003. Criteria: Practices and procedures are in place to protect employees in general industry from the hazards of entry into permit-required confined spaces. 29 CFR 1910.146 (a) Each employee is instructed in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

NASA Benchmarks Safety Functions Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SAFETY FUNCTIONS SAFETY FUNCTIONS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should be proactive in addressing safety-related issues. Management should have an established system to provide a ranking of safety considerations founded upon risk-based priorities. Criteria: A system is in place to provide a ranking of safety considerations founded upon risk-based priorities. (DOE/EH-0135) Procedures clearly define management's responsibility for safety- related decisions and provide for the escalation of matters in an appropriate time frame. (DOE/EH-0135) Management promotes safety programs and the organization's safety culture through sponsoring and attending safety meetings. (DOE/EH- 0135) Management encourages and supports effective programs for reporting

302

Operations Authorization Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Operations Authorization Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Controls established for safety are a discernible part of the plan for

303

Multiattribute utility analysis as a framework for public participation siting a hazardous waste facility  

SciTech Connect

How can the public play a role in decisions involving complicated scientific arguments? This paper describes a public participation exercise in which stakeholders used multiattribute utility analysis to select a site for a hazardous waste facility. Key to success was the ability to separate and address the two types of judgements inherent in environmental decisions: technical judgements on the likely consequences of alternative choices and value judgements on the importance or seriousness of those consequences. This enabled technical specialists to communicate the essential technical considerations and allowed stakeholders to establish the value judgements for the decision. Although rarely used in public participation, the multiattribute utility approach appears to provide a useful framework for the collaborative resolution of many complex environmental decision problems.

Merkhofer, M.W. [Applied Decision Analysis, Inc., Menlo Park, CA (United States); Conway, R. [Sandia National Labs., Albuquerque, NM (United States); Anderson, R.G. [Los Alamos National Lab., NM (United States)

1996-05-01T23:59:59.000Z

304

Environmental Assessment for the Ammunition Storage Facility at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

t30. t30. U.S. DEPARTHEHT OF EMERCT , FXNIDIIG OF It0 SIONI~ICAMT. IMPACT -1TIOH STORAGE E'ACXLITX AT THE SAVAxmAa RI-R iIT@ " Afl[EN, 6OtfTE CAROLXNA AGEYCT: U.S. Department of Energy ACTIOR: Finding of No Significant Impact s-r: The Department of Energy (DOE1 hqe prepared an Environmental ~Asscssx~ent (EA), DOE/EA-0820, for the proposed construction and operation of ~rl Ammunition Storage Facility at the Savannah River Site (SRS), Aiken, South Carolina. Based on the analyses in the &A, DOE ha8 determined that the propoeed action ie aot a major Federal action significantly affecting the quality of the human environment, within the meaning of the Natioaal Eavironmcatal Policy Act (NEPA) of 1969. Therefore, the preparatioa of an environruents~,impaCt Statement iS not required

305

INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER  

SciTech Connect

Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

Smith, M.; Iverson, D.

2010-12-08T23:59:59.000Z

306

Type B Investigation Board Report on the April 2, 2002, Worker Fall from Shoring/Scaffolding Structure at the Savannah River Site Tritium Extraction Facility Construction Site  

Energy.gov (U.S. Department of Energy (DOE))

On April 2, 2002, a carpenter helping to erect shoring/scaffolding fell about 52 and struck his head. He sustained head injuries requiring hospitalization that exceeded the threshold for a Type B investigation in accordance with Department of Energy (DOE) Order 225.1A, Accident Investigation. The accident occurred at the DOEs Savannah River Site (SRS) at the Tritium Extraction Facility (TEF) construction site.

307

Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee  

SciTech Connect

The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The HASP is written to make use of past experience and best management practices to eliminate or minimize hazards to workers or the environment from events such as fires, falls, mechanical hazards, or any unplanned release to the environment.

Flynn, N.C. Bechtel Jacobs

2008-04-21T23:59:59.000Z

308

Inadvertent Intruder Analysis For The Portsmouth On-Site Waste Disposal Facility (OSWDF)  

SciTech Connect

The inadvertent intruder analysis considers the radiological impacts to hypothetical persons who are assumed to inadvertently intrude on the Portsmouth OSWDF site after institutional control ceases 100 years after site closure. For the purposes of this analysis, we assume that the waste disposal in the OSWDF occurs at time zero, the site is under institutional control for the next 100 years, and inadvertent intrusion can occur over the following 1,000 year time period. Disposal of low-level radioactive waste in the OSWDF must meet a requirement to assess impacts on such individuals, and demonstrate that the effective dose equivalent to an intruder would not likely exceed 100 mrem per year for scenarios involving continuous exposure (i.e. chronic) or 500 mrem for scenarios involving a single acute exposure. The focus in development of exposure scenarios for inadvertent intruders was on selecting reasonable events that may occur, giving consideration to regional customs and construction practices. An important assumption in all scenarios is that an intruder has no prior knowledge of the existence of a waste disposal facility at the site. Results of the analysis show that a hypothetical inadvertent intruder at the OSWDF who, in the worst case scenario, resides on the site and consumes vegetables from a garden established on the site using contaminated soil (chronic agriculture scenario) would receive a maximum chronic dose of approximately 7.0 mrem/yr during the 1000 year period of assessment. This dose falls well below the DOE chronic dose limit of 100 mrem/yr. Results of the analysis also showed that a hypothetical inadvertent intruder at the OSWDF who, in the worst case scenario, excavates a basement in the soil that reaches the waste (acute basement construction scenario) would receive a maximum acute dose of approximately 0.25 mrem/yr during the 1000 year period of assessment. This dose falls well below the DOE acute dose limit of 500 mrem/yr. Disposal inventory constraints based on the intruder analysis are well above conservative estimates of the OSWDF inventory and, based on intruder disposal limits; about 7% of the disposal capacity is reached with the estimated OSWDF inventory.

Smith, Frank G.; Phifer, Mark A.

2014-01-22T23:59:59.000Z

309

DOE/SC-ARM-13-022 ARM Climate Research Facility The U.S. Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Climate Research Facility The U.S. Department of Energy Management Plan August 2013 Work supported by the U.S. Department of Energy, Office of Science, Office of...

310

Ignition studies in support of the European High Power Laser Energy Research Facility project  

Science Journals Connector (OSTI)

The European High Power Laser Energy Research Facility (HiPER) project is ... of the fusion target mixing prior to thermonuclear ignition have been investigated using the 1D Lagrangian...Z ion species may inhibit...

J. Pasley

2010-11-01T23:59:59.000Z

311

Verification and Validation of Facilities Procedures Assessment Plan - Developed By NNSA/Nevada Site Office Independent Oversight Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Verification and Validation of Facilities Procedures Verification and Validation of Facilities Procedures Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is verify and validate the process for the development of operations procedures and that procedures are in place which provide direction to personnel to ensure that the facility is operated within its design bases. Criteria: Operations procedures should be written to provide specific direction for operating systems and equipment during normal and postulated abnormal and emergency conditions. (DOE O 5480.19 A) Operations procedures should provide appropriate direction to ensure that the facility is operated within its design bases and should be effectively used to support safe operations of the facility. (DOE O 5480.19 A)

312

Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1993  

SciTech Connect

This report presents the annual hydrogeologic evaluation of 20 Resource Conservation and Recovery Act of 1976 groundwater monitoring projects and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Most of the projects no longer receive dangerous waste; a few projects continue to receive dangerous waste constituents for treatment, storage, or disposal. The 20 RCRA projects comprise 30 waste management units. Ten of the units are monitored under groundwater quality assessment status because of elevated levels of indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration, distribution, and rate of migration are evaluated. Groundwater is monitored at the other 20 units to detect contamination, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1992 and September 1993. Recent groundwater quality is also described for the 100, 200, 300, and 600 Areas and for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

Not Available

1994-02-01T23:59:59.000Z

313

Addendum to environmental monitoring plan Nevada Test Site and support facilities  

SciTech Connect

This 1992 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/1 0630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1992 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

NONE

1992-11-01T23:59:59.000Z

314

A successful effort to involve stakeholders in a facility siting decision using LIPS with stakeholder involvement  

SciTech Connect

Local public opposition to federal bureaucratic decisions has resulted in public agencies rethinking the role of stakeholders in decision making. Efforts to include stakeholders directly in the decision-making process are on the increase. Unfortunately, many attempts to involve members of the public in decisions involving complex technical issues have failed. A key problem has been defining a meaningful role for the public in the process of arriving at a technical decision. This paper describes a successful effort by Sandia National Laboratories (SNL) in New Mexico to involve stakeholders in an important technical decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), a facility intended to consolidate and store wastes generated from the cleanup of hazardous waste sites. A formal priority setting process known as the Laboratory Integration Prioritization System (LIPS) was adapted to provide an approach for involving the public. Although rarely applied to stakeholder participation, the LIPS process proved surprisingly effective. It produced a consensus over a selected site and enhanced public trust and understanding of Project activities.

Merkhofer, L. [Applied Decision Analysis, Inc., Menlo Park, CA (United States); Conway, R. [Sandia National Labs., Albuquerque, NM (United States); Anderson, B. [Los Alamos National Lab., NM (United States)

1995-12-31T23:59:59.000Z

315

Site Characterization Report ORGDP Diffusion Facilities Permanent Shutdown K-700 Power House and K-27 Switch Yard/Switch House  

SciTech Connect

The K-700 Power House area, initially built to supply power to the K-25 gaseous diffusion plant was shutdown and disassembled in the 1960s. This shutdown was initiated by TVA supplying economical power to the diffusion plant complex. As a result of world wide over production of enriched, reactor grade U{sup 235}, the K-27 switch yard and switch house area was placed in standby in 1985. Subsequently, as the future production requirements decreased, the cost of production increased and the separation technologies for other processes improved, the facility was permanently shutdown in December, 1987. This Site Characterization Report is a part of the FY-88 engineering Feasibility Study for placing ORGDP Gaseous Diffusion Process facilities in 'Permanent Shutdown'. It is sponsored by the Department of Energy through Virgil Lowery of Headquarters--Enrichment and through Don Cox of ORO--Enrichment Operations. The primary purpose of these building or site characterization reports is to document, quantify, and map the following potential problems: Asbestos; PCB containing fluids; Oils, coolants, and chemicals; and External contamination. With the documented quantification of the concerns (problems) the Engineering Feasibility Study will then proceed with examining the potential solutions. For this study, permanent shutdown is defined as the securing and/or conditioning of each facility to provide 20 years of safe service with minimal expenditures and, where feasible, also serving DOE's needs for long-term warehousing or other such low-risk use. The K-700 power house series of buildings were either masonry construction or a mix of masonry and wood. The power generating equipment was removed and sold as salvage in the mid 1960s but the buildings and auxiliary equipment were left intact. The nine ancillary buildings in the power house area use early in the Manhattan Project for special research projects, were left intact minus the original special equipment. During the late 1960s and 1970s, some of the abandoned buildings were used for offices, special projects, and storage. Some of the remaining electrical transformers contain PCBs in concentrations less than 500 ppm. Many of the steam and hot water pipes in the buildings are insulated with asbestos insulation, but none of the equipment or buildings have high counts of surface radioactive contamination. The general conditions of the buildings are from fair to poor. Many should be boarded-up to prevent personnel entry and in some cases demolitions would be the safer alternative.

Thomas R.J., Blanchard R.D.

1988-06-13T23:59:59.000Z

316

Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Salt Waste Processing Facility Technology Readiness Assessment Report Kurt D. Gerdes Harry D. Harmon Herbert G. Sutter Major C. Thompson John R. Shultz Sahid C. Smith July 13, 2009 Prepared by the U.S. Department of Energy Washington, D.C. SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 ii This page intentionally left blank SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii Signatures SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iv This page intentionally left blank SRS Salt Waste Processing Facility

317

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2005 [Facility News] October 15, 2005 [Facility News] Room to Share-New Guest Facility Ready for Users at North Slope of Alaska Bookmark and Share In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. To alleviate crowded conditions at its research facilities on the North Slope of Alaska (NSA) site in Barrow, ARM operations staff recently completed the installation of a new Guest Instrument Facility. Similar to the platform at the Atqasuk site, the facility consists of two insulated shipping containers mounted on pilings, with a mezzanine to accommodate

318

NETL: News Release - NETL Opens Fuel Cell/Turbine Hybrid Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

May 20, 2004 May 20, 2004 NETL Opens Fuel Cell/Turbine Hybrid Research Facility MORGANTOWN, WV - The Hybrid Performance Facility - called the Hyper facility - is now fully operational at the Department of Energy's National Energy Technology Laboratory (NETL). This one-of-a-kind facility, developed by NETL's Office of Science and Technology, will be used to develop control strategies for the reliable operation of fuel cell/turbine hybrids. - NETL's Fuel Cell/Turbine Hybrid Facility - The Hyper facility allows assessment of dynamic control and performance issues in fuel cell/turbine hybrid systems. Combined systems of turbines and fuel cells are expected to meet power efficiency targets that will help eliminate, at competitive costs, environmental concerns associated with the use of fossil fuels for

319

Exploratory shaft facility: It`s role in the characterization of the Yucca Mountain site for a potential nuclear repository  

SciTech Connect

The US Department of Energy is characterizing Yucca Mountain, Nevada, to assess its suitability as a potential site for the permanent disposal of high-level radioactive waste from nuclear power plants and defense related activities. The assessment activities include surface investigations, drill holes from the surface, and an underground facility for in situ characterization tests. This underground exploratory shaft facility is being designed to meet the criteria for characterizing the mountain as described in the Site Characterization Plan. 9 refs., 9 figs., 1 tab.

Kalia, H.N.; Merson, T.J.

1990-03-01T23:59:59.000Z

320

Calendar year 2002 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2003-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Cell Fabrication Facility Team Production and Research Activities...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting es030jansen2013o.pdf More Documents & Publications Current Research Activities in Electrode and...

322

Nanotechnology research facility? A vibration and noise control design case study  

Science Journals Connector (OSTI)

Vibration and noise control would be critical to the success of a proposed nanotechnology and molecular research facility. Roadway traffic a nearby power generation plant and buildings in the vicinity were potential sources of ground borne vibration disturbances. Mechanical equipment occupant installed support apparata and occupant activities were potential sources of internally generated vibration disturbances. On?site ground borne vibration was measured for comparison with generic floor vibration criteria for sensitive installations. Results were analyzed relative to criteria for potential disturbance of sensitive equipment perception by occupants audible radiated structure borne noise in acoustically sensitive spaces and resolution?degrading motion for scanning and for transmission electron microscopes and other nanotechnology clean room equipment. Design guidelines and structural vibration control concepts were recommended to the structural engineers including de?tuning damping and isolation methods. Recommendations were provided for mechanical noise control and vibration isolation. Architectural noise control sound isolation and room acoustics guidelines were provided for research office and meeting spaces. This case study will discuss the desired vibration and noise control objectives and the design solutions that were implemented. Building photographs will be presented. Post?construction measurement results will be graphically compared with pre?construction conditions to demonstrate apparent degree of success in mitigating vibration.

Jack B. Evans; Chad N. Himmel; Daniel J. Kupersztoch

2008-01-01T23:59:59.000Z

323

Research at the BNL Tandem Van de Graaff Facility, 1980  

SciTech Connect

Research programs at the Brookhaven Van de Graaff accelerators are summarized. Major accomplishments of the laboratory are discussed including quasielastic reactions, high-spin spectroscopy, yrast spectra, fusion reactions, and atomic physics. The outside user program at the Laboratory is discussed. Research proposed for 1981 is outlined. (GHT)

Not Available

1981-03-01T23:59:59.000Z

324

Facilities | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering Research Facility Distributed Energy Research Center Engine Research Facility Heat Transfer Laboratory Tribology Laboratory Transportation Beamline at the Advanced...

325

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development May 2011 August 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope and Methodology ......................................................................................................................... 2 4.0 Results .................................................................................................................................................... 3

326

Decommissioning an Active Historical Reactor Facility at the Savannah River Site - 13453  

SciTech Connect

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions (SRNS). In 2004, DOE recognized SRS as structure within the Cold War Historic District of national, state and local significance composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. This reactor has five primary areas within it, including a Disassembly Basin (DB) that received irradiated materials from the reactor, cooled them and prepared the components for loading and transport to a Separation Canyon for processing. The 6,317 square meter area was divided into numerous work/storage areas. The walls between the individual basin compartments have narrow vertical openings called 'slots' that permit the transfer of material from one section to another. Data indicated there was over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 M liters of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The need for an action was identified in 2010 to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. DOE, its regulators [U. S. Environmental Protection Agency (USEPA)-Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC)] and the SC Historical Preservation Office (SHPO) agreed/concurred to perform a non-time critical removal action for the In Situ Decommissioning (ISD) of the 105-C Disassembly Basin. ISD consisted of stabilization/isolation of remaining contaminated water, sediment, activated reactor equipment, and scrap metal by filling the DB with underwater non-structural grout to the appropriate (-4.877 meter) grade-level, thence with dry area non-structural grout to the final -10 centimeter level. The roof over the DB was preserved due to its potential historical significance and to prevent the infiltration of precipitation. Forced evaporation was the form of treatment implemented to remove the approximately 9.1 M liters of contaminated basin water. Using specially formulated grouts, irradiated materials and sediment were treated by solidification/isolation thus reducing their mobility, reducing radiation exposure and creating an engineered barrier thereby preventing access to the contaminants. Grouting provided a low permeability barrier to minimize any potential transport of contaminants to the aquifer. Efforts were made to preserve the historical significance of the Reactor in accordance with the National Historic Preservation Act. ISD provides a cost effective means to isolate and contain residual radioactivity from past nuclear operations allowing natural radioactive decay to reduce hazards to manageable levels. This method limits release of radiological contamination to the environment, minimizes radiation exposure to workers, prevents human/animal access to the hazardous substances, and allows for ongoing monitoring of the decommissioned facility. Field construction was initiated in August 2011; evaporator operations commenced January 2012 and ended July 2012 with over 9 M liters of water treated/removed. Over 8,525 cubic meters of grout were placed, completing in August 2012. The project completed with an excellent safety record, on schedule and under budget. (authors)

Bergren, Christopher L.; Long, J. Tony; Blankenship, John K. [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States); Adams, Karen M. [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)

2013-07-01T23:59:59.000Z

327

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2009 [Facility News] 7, 2009 [Facility News] Town Hall Meeting at AGU 2009 Fall Meeting Bookmark and Share ARM Climate Research Facility - New Measurement Capabilities for Climate Research Thursday, December 17, 6:15-7:15 pm, Moscone West Room 2002 American Recovery and Reinvestment Act American Recovery and Reinvestment Act Scientists from around the world use data from the ARM Climate Research Facility to study the interactions between clouds, aerosol and radiation. Through the American Recovery and Reinvestment Act of 2009, the DOE Office of Science received $1.2 billion, with $60 million allocated to the ARM Climate Research Facility. With these funds, ARM will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several sites with precipitation radars and energy flux measurement capabilities,

328

SlTEWlDE CATEGORICAL EXCLUSION FOR MlCROBIOLOGICAL AND BIOMEDICAL RESEARCH PROJEers. PACIFIC NORTHWEST SITE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SlTEWlDE CATEGORICAL EXCLUSION FOR MlCROBIOLOGICAL AND SlTEWlDE CATEGORICAL EXCLUSION FOR MlCROBIOLOGICAL AND BIOMEDICAL RESEARCH PROJEers. PACIFIC NORTHWEST SITE OFFICE, RICHLAND, WASHINGTON Proposed Aetion: The U.S. Department ofBnergy (DOE) Pacific Northwest Site Office (PNSO) proposes to conduct microbiological, biomedical, and diagnostic research projects. LoeatiOD of AetlOD: The proposed action would occur on the Pacific Northwest National Laboratory (PNNL) Site and in and near PNNL facilities. Deseription of the Proposed Action: DOE proposes to conduct microbiological and biomedical projects to S1;IPport the following general research areas: * molecular .. level understanding of the physical, chemical, and biological processes that underlie environmental remediation, biomolecular systems, waste processing and

329

Cutting-Edge Experimental Equipment Facilities for High Quality Research  

E-Print Network (OSTI)

accomplishments of Kyoto University's researchers owe a great deal to its unique approach to promoting education usually occur at 0°K. There is no loss of electricity in such circumstances. This condition is established

Takada, Shoji

330

National scientific facilities and their science impact on nonbiomedical research  

Science Journals Connector (OSTI)

...PHARMACOLOGY or SO = JOURNAL OF DENTAL RESEARCH or SO = JOURNAL OF...CANCER or SO = INVESTIGATIVE RADIOLOGY or SO = JOURNAL...or TS = TOXICOLOGY or TS = RADIOLOGY or TS = MEDICAL IMAGING...MULTIDISCIPLINARY, FORESTRY, RADIOLOGY, NUCLEAR MEDICINE & MEDICAL...

A. L. Kinney

2007-01-01T23:59:59.000Z

331

Savannah River Site - Salt Waste Processing Facility: Briefing on the Salt Waste Processing Facility Independent Technical Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Independent Technical Review Harry Harmon January 9, 2007 2 U.S. Department of Energy Outline * SWPF Process Overview * Major Risks * Approach for Conducting Review * Discussion of Findings * Conclusions 3 U.S. Department of Energy Salt Waste Processing Facility 4 U.S. Department of Energy SWPF Process Overview Alpha Finishing Process CSSX Alpha Strike Process MST/ Sludge Cs Strip Effluent DSS 5 U.S. Department of Energy BOTTOM LINE The SWPF Project is ready to move into final design. 6 U.S. Department of Energy Major Risks * Final geotechnical data potentially could result in redesign of the PC-3 CPA base mat and structure. * Cost and schedule impacts arising from the change from ISO-9001 to NQA-1 quality assurance requirements. * The "de-inventory, flush, and then hands-on

332

Argonne Transportation Site Index  

NLE Websites -- All DOE Office Websites (Extended Search)

Student Competitions Technology Analysis Transportation Research and Analysis Computing Center Working With Argonne Contact TTRDC Site Index General Information About TTRDC Media Center Current News News Archive Photo Archive Transportation Links Awards Contact Us Interesting Links Working with Argonne Research Resources Experts Batteries Engines & Fuels Fuel Cells Management Materials Systems Assessment Technology Analysis Tribology Vehicle Recycling Vehicle Systems Facilities Advanced Powertrain Research Facility Powertrain Test Cell 4-Wheel Drive Chassis Dynamometer Battery Test Facility Engine Research Facility Fuel Cell Test Facility Tribology Laboratory Tribology Laboratory Photo Tour Vehicle Recycling Partnership Plant Publications Searchable Database: patents, technical papers, presentations

333

Hanford Site Near-Facility Environmental Monitoring Data Report for Calendar Year 2008  

SciTech Connect

Near-facility environmental monitoring is defined as monitoring near facilities that have the potential to discharge or have discharged, stored, or disposed of radioactive or hazardous materials. Monitoring locations are associated with nuclear facilities such as the Plutonium Finishing Plant, Canister Storage Building, and the K Basins; inactive nuclear facilities such as N Reactor and the Plutonium-Uranium Extraction (PUREX) Facility; and waste storage or disposal facilities such as burial grounds, cribs, ditches, ponds, tank farms, and trenches. Much of the monitoring consists of collecting and analyzing environmental samples and methodically surveying areas near facilities. The program is also designed to evaluate acquired analytical data, determine the effectiveness of facility effluent monitoring and controls, assess the adequacy of containment at waste disposal units, and detect and monitor unusual conditions.

Perkins, Craig J.; Dorsey, Michael C.; Mckinney, Stephen M.; Wilde, Justin W.; Poston, Ted M.

2009-09-15T23:59:59.000Z

334

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site  

SciTech Connect

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Portsmouth site in Ohio (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Portsmouth to a more stable chemical form suitable for use or disposal. The facility would also convert the DUF{sub 6} from the East Tennessee Technology Park (ETTP) site near Oak Ridge, Tennessee. In a Notice of Intent (NOI) published in the Federal Register on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (United States Code, Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (Code of Federal Regulations, Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a Federal Register Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Portsmouth site; from the transportation of all ETTP cylinders (DUF{sub 6}, low-enriched UF6 [LEU-UF{sub 6}], and empty) to Portsmouth; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). An option of shipping the ETTP cylinders to Paducah is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Portsmouth and ETTP sites. A separate EIS (DOE/EIS-0359) evaluates potential environmental impacts for the proposed Paducah conversion facility.

N /A

2003-11-28T23:59:59.000Z

335

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Paducah DUF 6 DEIS: December 2003 SUMMARY S.1 INTRODUCTION This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the Federal Register (FR) on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth,

336

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

CIMEL Sunphotometer Helps Researchers See the Light in Australia CIMEL Sunphotometer Helps Researchers See the Light in Australia Bookmark and Share A CIMEL sunphotometer, similar to this one in Tinga Tingana, Australia, will be installed at the ARM Climate Research Facility Darwin site. Photo courtesy of NASA Goddard Space Flight Center. A CIMEL sunphotometer, similar to this one in Tinga Tingana, Australia, will be installed at the ARM Climate Research Facility Darwin site. Photo courtesy of NASA Goddard Space Flight Center. Science collaborators at the Australian Bureau of Meteorology (BOM) and the Australian Commonwealth Scientific and Industry Research Organization (CSIRO) are using the ARM Climate Research Facility Darwin site in Australia to evaluate aerosol optical properties during the tropical dry season. As part of the Darwin Aerosol Intensive Operational Period (IOP), a

337

Atmospheric Radiation Measurement Climate Research Facility (ACRF Instrumentation Status: New, Current, and Future)  

SciTech Connect

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) Small Business Innovation Research instrument development.

JW Voyles

2008-01-30T23:59:59.000Z

338

CHARACTERIZING DOE HANFORD SITE WASTE ENCAPSULATION STORAGE FACILITY CELLS USING RADBALL  

SciTech Connect

RadBall{trademark} is a novel technology that can locate and quantify unknown radioactive hazards within contaminated areas, hot cells, and gloveboxes. The device consists of a colander-like outer tungsten collimator that houses a radiation-sensitive polymer semi-sphere. The collimator has a number of small holes with tungsten inserts; as a result, specific areas of the polymer are exposed to radiation becoming increasingly more opaque in proportion to the absorbed dose. The polymer semi-sphere is imaged in an optical computed tomography scanner that produces a high resolution 3D map of optical attenuation coefficients. A subsequent analysis of the optical attenuation data using a reverse ray tracing or backprojection technique provides information on the spatial distribution of gamma-ray sources in a given area forming a 3D characterization of the area of interest. RadBall{trademark} was originally designed for dry deployments and several tests, completed at Savannah River National Laboratory and Oak Ridge National Laboratory, substantiate its modeled capabilities. This study involves the investigation of the RadBall{trademark} technology during four submerged deployments in two water filled cells at the DOE Hanford Site's Waste Encapsulation Storage Facility.

Farfan, E.; Coleman, R.

2011-03-31T23:59:59.000Z

339

SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND CHARACTERISTICS AT NUCLEAR FACILITY SITES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y Y : J O H N D . S T E V E N S O N C O N S U L T I N G E N G I N E E R 6 6 1 1 R O C K S I D E R D . I N D E P E N D E N C E , O H I O 4 4 1 3 1 T E L . 2 1 6 - 4 4 7 - 9 4 4 0 E M A I L : J S T E V E N S O N 4 @ E A R T H L I N K . N E T SUMMARY OF REVISED TORNADO, HURRICANE AND EXTREME STRAIGHT WIND CHARACTERISTICS AT NUCLEAR FACILITY SITES Categorization of Natural Hazard Phenomenon and Operational Load Combinations Prior to the 1988 Uniform Building Code, UBC (1) natural hazard phenomenon (earthquake, wind, flooding and precipitation) and operational load combinations were divided into two categories: NORMAL- Loads such as dead, live and design basis pressure. Expected frequency: 1.0 per yr with a limiting acceptance criteria Allowable stress design criteria: equal to one-half to two-thirds of specified minimum yield stress. SEVERE - Natural hazard and operational transient loads.

340

NSTX Program Governance, Research Support and Facility Operation  

E-Print Network (OSTI)

· Milestone performance history · Scheduling operation, maintenance & upgrades · Managing environment, safety of the proposed research environment and resources. Do the collaborative arrangements achieve the goal Program Director Jon Menard Deputy: S. Kaye Engineering Ops Al von Halle Project Engineer Charles Neumeyer

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Type B Accident Investigation Board Report of the Savannah River Site Hand Injury at the Salt Waste Processing Facility on October 6, 2009  

Energy.gov (U.S. Department of Energy (DOE))

This report documents the results of the Type B Accident Investigation Board (Board) investigation of the October 6, 2009, hand injury at the Department of Energy (DOE) Savannah River Site (SRS) Salt Waste Processing Facility construction site.

342

NEPA CX Determination SS-SC-12-03 for the Stanford Research Computer Facility (SRCF)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 for the Stanford Research Computer Facility (SRCF) 3 for the Stanford Research Computer Facility (SRCF) National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination A. SSO NEPA Control #: SS-SC-12-03 AN12038 B. Brief Description of Proposed Action: The project scope includes the construction of a new computer facility (21,500 square feet) capable of providing 3 MW of data center potential. The new two-story facility will provide infrastructure for a multitude of server racks. There are three fenced service yards outside the building, one for chillers, one for new electrical substation equipment, and one for emergency generators. The ground floor will be utilized for electrical and receiving area; the second floor will have a server room, mechanical room, conference

343

Geological and Geotechnical Site Investigation for the Design of a CO2 Rich Flue Gas Direct Injection and Storage Facility  

SciTech Connect

With international efforts to limit anthropogenic carbon in the atmosphere, various CO{sub 2} sequestration methods have been studied by various facilities worldwide. Basalt rock in general has been referred to as potential host material for mineral carbonation by various authors, without much regard for compositional variations due to depositional environment, subsequent metamorphism, or hydrothermal alteration. Since mineral carbonation relies on the presence of certain magnesium, calcium, or iron silicates, it is necessary to study the texture, mineralogy, petrology, and geochemistry of specific basalts before implying potential for mineral carbonation. The development of a methodology for the characterization of basalts with respect to their susceptibility for mineral carbonation is proposed to be developed as part of this research. The methodology will be developed based on whole rock data, petrography and microprobe analyses for samples from the Caledonia Mine in Michigan, which is the site for a proposed small-scale demonstration project on mineral carbonation in basalt. Samples from the Keweenaw Peninsula will be used to determine general compositional trends using whole rock data and petrography. Basalts in the Keweenaw Peninsula have been subjected to zeolite and prehnite-pumpellyite facies metamorphism with concurrent native copper deposition. Alteration was likely due to the circulation of CO{sub 2}-rich fluids at slightly elevated temperatures and pressures, which is the process that is attempted to be duplicated by mineral carbonation.

Metz, Paul; Bolz, Patricia

2013-03-25T23:59:59.000Z

344

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientists Convene in Australia to Plan International Cloud Experiment Scientists Convene in Australia to Plan International Cloud Experiment Bookmark and Share During TWP-ICE, cloud property data will be obtained from numerous research aircraft and a network of surface-based remote sensing sites, including a ship operating in the Timor Sea and numerous ground sites in a 200 km diameter around the ARM Climate Research Facility site in Darwin, Australia. During TWP-ICE, cloud property data will be obtained from numerous research aircraft and a network of surface-based remote sensing sites, including a ship operating in the Timor Sea and numerous ground sites in a 200 km diameter around the ARM Climate Research Facility site in Darwin, Australia. Coming from as far away as Italy, Switzerland, and the United States, a 45 member team gathered in Darwin, Australia, in mid-November to discuss plans

345

Audit Report: Modular Office Facilities for Recovery Act Program Activities at the Hanford Site, OAS-RA-13-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Audit Report Modular Office Facilities for Recovery Act Program Activities at the Hanford Site OAS-RA-L-13-04 July 2013 Department of Energy Washington, DC 20585 July 9, 2013 MEMORANDUM FOR THE MANAGER, RICHLAND OPERATIONS OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Modular Office Facilities for Recovery Act Program Activities at the Hanford Site" BACKGROUND The Department of Energy's Richland Operations Office (Richland) awarded a contract, effective October 1, 2008, to CH2M HILL Plateau Remediation Company (CHPRC) to remediate select portions of the Hanford Site's Central Plateau. As part of the American Recovery and

346

Disposal of radioactive waste from nuclear research facilities  

E-Print Network (OSTI)

Swiss radioactive wastes originate from nuclear power plants (NPP) and from medicine (e.g. radiation sources), industry (e.g. fire detectors) and research (e.g. CERN, PSI). Their conditioning, characterisation and documentation has to meet the demands given by the Swiss regulatory authorities including all information needed for a safe disposal in future repositories. For NPP wastes, arisings as well as the processes responsible for the buildup of short and long lived radionuclides are well known, and the conditioning procedures are established. The radiological inventories are determined on a routinely basis using a combined system of measurements and calculational programs. For waste from research, the situation is more complicated. The wide spectrum of different installations combined with a poorly known history of primary and secondary radiation results in heterogeneous waste sorts with radiological inventories quite different from NPP waste and difficult to measure long lived radionuclides. In order to c...

Maxeiner, H; Kolbe, E

2003-01-01T23:59:59.000Z

347

SITE  

Office of Legacy Management (LM)

-@-Y? ALTERNATE -@-Y? ALTERNATE NfiME: --___---------------___________________N~ME:---------------------- CITY- - .---------------^---------- STATE: wz ------ OWNER(S) -------- Past: Current: ------------------------ _~~--___~~-----_~~----~~-- Owner contacted [3 yes 0 no; if yes, date contacted ------------- TYPE OF ' OPERATION ____-------~----- q Research & Development !zl Facility Type 0 Production scale testing 0 Manufactuiinq 0 Pilot Scale [7 University 0 Bench Scale Process 0 Research Organization 0 Theoretical Studies 0 Government Sponsored Faci 1 i ty 0 Sample & Analysis Cl Other ---_-~~----_~~---~-~ 0 Production 0 Disposal/Storage TYPE OF CONTRACT -_---------~~~~~ q Prime q Subcontract& 0 Purchase Order 0 Other information (i.e., c&t

348

Siting algae cultivation facilities for biofuel production in the United States: trade-offs between growth rate, site constructability, water availability, and infrastructure  

SciTech Connect

Locating sites for new algae cultivation facilities is a complex task. The climate must support high growth rates, and cultivation ponds require appropriate land and water resources as well as key utility and transportation infrastructure. We employ our spatiotemporal Biomass Assessment Tool (BAT) to select promising locations based on the open-pond cultivation of Arthrospira sp. and a strain of the order Desmidiales. 64,000 potential sites across the southern United States were evaluated. We progressively apply a range of screening criteria and track their impact on the number of selected sites, geographic location, and biomass productivity. Both strains demonstrate maximum productivity along the Gulf of Mexico coast, with the highest values on the Florida peninsula. In contrast, sites meeting all selection criteria for Arthrospira were located along the southern coast of Texas and for Desmidiales were located in Louisiana and southern Arkansas. Site selection was driven mainly by the lack of oil pipeline access in Florida and elevated groundwater salinity in southern Texas. The requirement for low salinity freshwater (<400 mg L-1) constrained Desmidiales locations; siting flexibility is greater for salt-tolerant species such as Arthrospira. Combined siting factors can result in significant departures from regions of maximum productivity but are within the expected range of site-specific process improvements.

Venteris, Erik R.; McBride, Robert; Coleman, Andre M.; Skaggs, Richard; Wigmosta, Mark S.

2014-02-21T23:59:59.000Z

349

The universe in the laboratory - Nuclear astrophysics opportunity at the facility for antiproton and ion research  

SciTech Connect

In the next years the Facility for Antiproton and Ion Research FAIR will be constructed at the GSI Helmholtzze-ntrum fr Schwerionenforschung in Darmstadt, Germany. This new accelerator complex will allow for unprecedented and pathbreaking research in hadronic, nuclear, and atomic physics as well as in applied sciences. This manuscript will discuss some of these research opportunities, with a focus on supernova dynamics and nucleosynthesis.

Langanke, K. [GSI Helmholtzzentrum fr Schwerionenforschung, Technische Universitt Darmstadt, Frankfurt Institute of Advanced Studies, D-64291 Darmstadt (Germany)

2014-05-09T23:59:59.000Z

350

ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

govSitesAerial Facility govSitesAerial Facility AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director ARM Aerial Facility Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the ARM Science Team and the external

351

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

SciTech Connect

This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products (hydrogen fluoride [HF] or calcium fluoride [CaF{sub 2}]). Although not part of the proposed action, an option of shipping all cylinders (DUF{sub 6}, low-enriched UF{sub 6} [LEU-UF{sub 6}], and empty) stored at the East Tennessee Technology Park (ETTP) near Oak Ridge, Tennessee, to Paducah rather than to Portsmouth is also considered. In addition, this EIS evaluates a no action alternative, which assumes continued storage of DUF{sub 6} in cylinders at the Paducah site. A separate EIS (DOE/EIS-0360) evaluates the potential environmental impacts for the proposed Portsmouth conversion facility.

N /A

2003-11-28T23:59:59.000Z

352

ARM Climate Research Facility Infrastructure Report for the August 2005 STEC Meeting  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Research Facility Climate Research Facility Operations Status System Upgrades & Enhancements Status Brad Perkins ARM Engineering, TWPO/AMF March 29, 2006 2 Overview ARM Science Team Meeting - March 2006 Progress Report Demonstration Discussion? 3 Background Before we go on... Who is my Audience? Do I need to explain OSS' Purpose? 4 Background OSS Meeting, July 2005 Argonne National Laboratory ECO-00432 Late 2004/Early 2005 Requirements Analysis Operations Managers, OSS Users Present Problems Reviewed & Solutions Offered Future Features/Modules Discussed Path Forward Outlined w/ Schedule Calibration Module Requirement Removed 5 Status December 2005 Target Underestimated Effort Other Issues Competing Priorities (AMF support) Post Argonne Meeting Requirements Gathering

353

LBNL Computational Research & Theory Facility Groundbreaking - Full Press Conference. Feb 1st, 2012  

ScienceCinema (OSTI)

Energy Secretary Steven Chu, along with Berkeley Lab and UC leaders, broke ground on the Lab's Computational Research and Theory (CRT) facility yesterday. The CRT will be at the forefront of high-performance supercomputing research and be DOE's most efficient facility of its kind. Joining Secretary Chu as speakers were Lab Director Paul Alivisatos, UC President Mark Yudof, Office of Science Director Bill Brinkman, and UC Berkeley Chancellor Robert Birgeneau. The festivities were emceed by Associate Lab Director for Computing Sciences, Kathy Yelick, and Berkeley Mayor Tom Bates joined in the shovel ceremony.

Yelick, Kathy

2013-05-29T23:59:59.000Z

354

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 1  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs.

NONE

1988-01-01T23:59:59.000Z

355

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 4  

SciTech Connect

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved by the President for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package; and to present the plans for obtaining the geologic information necessary to demonstate the suitability of the site for a repository, to desin the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next; it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

NONE

1988-01-01T23:59:59.000Z

356

The 1993 baseline biological studies and proposed monitoring plan for the Device Assembly Facility at the Nevada Test Site  

SciTech Connect

This report contains baseline data and recommendations for future monitoring of plants and animals near the new Device Assembly Facility (DAF) on the Nevada Test Site (NTS). The facility is a large structure designed for safely assembling nuclear weapons. Baseline data was collected in 1993, prior to the scheduled beginning of DAF operations in early 1995. Studies were not performed prior to construction and part of the task of monitoring operational effects will be to distinguish those effects from the extensive disturbance effects resulting from construction. Baseline information on species abundances and distributions was collected on ephemeral and perennial plants, mammals, reptiles, and birds in the desert ecosystems within three kilometers (km) of the DAF. Particular attention was paid to effects of selected disturbances, such as the paved road, sewage pond, and the flood-control dike, associated with the facility. Radiological monitoring of areas surrounding the DAF is not included in this report.

Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

1995-02-01T23:59:59.000Z

357

Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site  

SciTech Connect

This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D&D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D&D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS.

NONE

1998-01-01T23:59:59.000Z

358

LANSCE | Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Isotope Production Facility (IPF) Lujan Neutron Scattering Center Materials Test Station (MTS) Proton Radiography (pRad) Ultracold Neutrons (UCN) Weapons Neutron Research Facility...

359

Avian Research at the Savannah River Site: A Model For Integrating Basic Research and Long-Term Management  

E-Print Network (OSTI)

... Savannah River Site: implications for habitat management and nuclear waste site remediation ... I. Lehr Brisbin, Jr., and Robert A. ... The resulting discus- sions improved our collective understanding of the research/management interaction, and even- tually ...

360

Review of the Hanford Site K-West Annex Facility Layup Program for Construction Suspension/Delay, June 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR-Hanford-2013-06-10 Site: Hanford Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Review of the Hanford Site K-West Annex Facility Layup Program for Construction Suspension/Delay Dates of Activity : June 10, 2013 Report Preparer: Joseph Lenahan Activity Description/Purpose: 1. Perform an inspection of the project site to examine the contractor's actions to protect completed work from deteriorating during the current suspension of construction work activities. 2. Inspect storage areas to determine if construction materials are stored in a manner that will prevent deterioration during possible long-term storage while construction work is suspended.

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Review of the Hanford Site K-West Annex Facility Layup Program for Construction Suspension/Delay, June 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR-Hanford-2013-06-10 Site: Hanford Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Review of the Hanford Site K-West Annex Facility Layup Program for Construction Suspension/Delay Dates of Activity : June 10, 2013 Report Preparer: Joseph Lenahan Activity Description/Purpose: 1. Perform an inspection of the project site to examine the contractor's actions to protect completed work from deteriorating during the current suspension of construction work activities. 2. Inspect storage areas to determine if construction materials are stored in a manner that will prevent deterioration during possible long-term storage while construction work is suspended.

362

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PADUCAH, KENTUCKY, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Paducah DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

363

Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT ENVIRONMENTAL IMPACT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR CONSTRUCTION AND OPERATION OF A DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITY AT THE PORTSMOUTH, OHIO, SITE DECEMBER 2003 U.S. Department of Energy-Oak Ridge Operations Office of Environmental Management Cover Sheet Portsmouth DUF 6 DEIS: December 2003 iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Environmental Impact Statement (DEIS) for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831

364

Brookhaven National Laboratory is home to world-class research facilities and sc  

NLE Websites -- All DOE Office Websites (Extended Search)

is home to world-class research facilities and scientific is home to world-class research facilities and scientific departments which attract resident and visiting scientists in many fields. This outstanding mix of machine- and mind-power has on seven occasions produced research deemed worthy of the greatest honor in science: the Nobel Prize. 2009 Nobel Prize in Chemistry Venkatraman Ramakrishnan, of the Medical Research Council Laboratory of Molecular Biology in Cambridge, UK, a former employee in Brookhaven's Biology Department, and a long-time user of Brookhaven's National Synchrotron Light Source (NSLS), and Thomas A. Steitz of Yale University, also a long-time NSLS user, shared the prize with Ada E. Yonath of the Weizmann Institute of Science for studying the structure and function of the ribosome.

365

Independent Activity Report, Nevada National Security Site -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Security Site Operational Readiness Review for the Joint Actinide Shock Physics Experimental Research Facility Restart Pre-visit HIAR-NNSS-2011-04-28 This...

366

Materials Corrosion and Mitigation Strategies for APT, Weapons Neutron Research Facility Experiments  

E-Print Network (OSTI)

Materials Corrosion and Mitigation Strategies for APT, Weapons Neutron Research Facility Experiments: The Effects of 800 MeV Proton Irradiation on the Corrosion of Tungsten, Tantalum, Stainless Steel, and Gold R. Scott Lillard, Darryl P. Butt Materials Corrosion & Environmental Effects Laboratory MST-6

367

THE HOLIFIELD HEAVY-ION RESEARCH FACILITY AT OAK RIDGE C. M. JONES  

E-Print Network (OSTI)

1353 THE HOLIFIELD HEAVY-ION RESEARCH FACILITY AT OAK RIDGE C. M. JONES Oak Ridge National Laboratory*, Oak Ridge, Tennessee 37830, U.S.A. Résumé. 2014 Un nouveau laboratoire de recherche sur les ions lourds est actuellement en construction au Laboratoire National d'Oak Ridge. Cet exposé présente une

Paris-Sud XI, Université de

368

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage for Scientific Data  

E-Print Network (OSTI)

EMSL Research and Capability Development Proposals Facility-Wide Management and Storage become an increasingly important challenge in science. In many small- to medium-scale laboratory and methodologies employed to produce them. These approaches are tractable up to a certain limit--as long

369

ALL-PATHWAYS DOSE ANALYSIS FOR THE PORTSMOUTH ON-SITE WASTE DISPOSAL FACILITY  

SciTech Connect

A Portsmouth On-Site Waste Disposal Facility (OSWDF) All-Pathways analysis has been conducted that considers the radiological impacts to a resident farmer. It is assumed that the resident farmer utilizes a farm pond contaminated by the OSWDF to irrigate a garden and pasture and water livestock from which food for the resident farmer is obtained, and that the farmer utilizes groundwater from the Berea sandstone aquifer for domestic purposes (i.e. drinking water and showering). As described by FBP 2014b the Hydrologic Evaluation of Landfill Performance (HELP) model (Schroeder et al. 1994) and the Surface Transport Over Multiple Phases (STOMP) model (White and Oostrom 2000, 2006) were used to model the flow and transport from the OSWDF to the Points of Assessment (POAs) associated with the 680-ft elevation sandstone layer (680 SSL) and the Berea sandstone aquifer. From this modeling the activity concentrations radionuclides were projected over time at the POAs. The activity concentrations were utilized as input to a GoldSimTM (GTG 2010) dose model, described herein, in order to project the dose to a resident farmer over time. A base case and five sensitivity cases were analyzed. The sensitivity cases included an evaluation of the impacts of using a conservative inventory, an uncased well to the Berea sandstone aquifer, a low waste zone uranium distribution coefficient (Kd), different transfer factors, and reference person exposure parameters (i.e. at 95 percentile). The maximum base case dose within the 1,000 year assessment period was projected to be 1.5E-14 mrem/yr, and the maximum base case dose at any time less than 10,000 years was projected to be 0.002 mrem/yr. The maximum projected dose of any sensitivity case was approximately 2.6 mrem/yr associated with the use of an uncased well to the Berea sandstone aquifer. This sensitivity case is considered very unlikely because it assumes leakage from the location of greatest concentration in the 680 SSL in to the Berea sandstone aquiver over time and does not conform to standard private water well construction practices. The bottom-line is that all predicted doses from the base case and five sensitivity cases fall well below the DOE all-pathways 25 mrem/yr Performance Objective.

Smith, F.; Phifer, M.

2014-04-10T23:59:59.000Z

370

ARM Climate Research Facilities on the North Slope of Alaska: Field Campaigns in 2007, New Facilities, and the International Polar Year  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Research Facilities on the North Slope of Alaska: Climate Research Facilities on the North Slope of Alaska: Field Campaigns in 2007, New Facilities, and the International Polar Year Radiative Heating in Underexplored Bands Campaign (RHUBC): Feb 26 - Mar 14 2007 Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Contributors: Mark Ivey, Bernie Zak, Jeff Zirzow, Sandia National Labs Dana Truffer-Moudra, University of Alaska Fairbanks Hans Verlinde, Chad Bahrmann, Scott Richardson, Penn State University Winter

371

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.  

SciTech Connect

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating sy

Cle Elum Supplementation and Research Facility

2008-12-11T23:59:59.000Z

372

Manhattan Project buildings and facilities at the Hanford Site: A construction history  

SciTech Connect

This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

Gerber, M.S.

1993-09-01T23:59:59.000Z

373

Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility. Phase 1  

SciTech Connect

The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction.

King, J.W.

1993-08-01T23:59:59.000Z

374

Borehole Imaging of In Situ Stress Tests at Mirror Lake Research Site |  

Open Energy Info (EERE)

Borehole Imaging of In Situ Stress Tests at Mirror Lake Research Site Borehole Imaging of In Situ Stress Tests at Mirror Lake Research Site Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Borehole Imaging of In Situ Stress Tests at Mirror Lake Research Site Author U.S. Geological Survey Published U.S. Geological Survey, 2013 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Borehole Imaging of In Situ Stress Tests at Mirror Lake Research Site Citation U.S. Geological Survey. Borehole Imaging of In Situ Stress Tests at Mirror Lake Research Site [Internet]. 2013. U.S. Geological Survey. [cited 2013/10/16]. Available from: http://water.usgs.gov/ogw/bgas/toxics/ml_bips.html Retrieved from "http://en.openei.org/w/index.php?title=Borehole_Imaging_of_In_Situ_Stress_Tests_at_Mirror_Lake_Research_Site&oldid=688729"

375

Money for Research, Not for Energy Bills: Finding Energy and Cost Savings in High Performance Computer Facility Designs  

SciTech Connect

High-performance computing facilities in the United States consume an enormous amount of electricity, cutting into research budgets and challenging public- and private-sector efforts to reduce energy consumption and meet environmental goals. However, these facilities can greatly reduce their energy demand through energy-efficient design of the facility itself. Using a case study of a facility under design, this article discusses strategies and technologies that can be used to help achieve energy reductions.

Drewmark Communications; Sartor, Dale; Wilson, Mark

2010-07-01T23:59:59.000Z

376

Niagara falls storage site: Annual site environmental report, Lewiston, New York, Calendar Year 1988: Surplus Facilities Management Program (SFMP)  

SciTech Connect

The monitoring program at the Niagara Falls Storage Site (NFSS) measures radon concentrations in air; external gamma radiation levels; and uranium and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess its potential effect on public health, the radiation dose was calculated for a hypothetical maximally exposed individual. Based on the conservative scenario described in this report, this hypothetical individual receives an annual external exposure approximately equivalent to 6 percent of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than a person receives during two round-trip flights from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the NFSS that results from radioactive materials present at the site is indistinguishable from the dose that the same population receives from naturally occurring radioactive sources. Results of the 1988 monitoring show that the NFSS is in compliance with applicable DOE radiation protection standards. 17 refs., 31 figs., 20 tabs.

Not Available

1989-04-01T23:59:59.000Z

377

Processing capabilties for the elimination of contaminated metal scrapyards at DOE/ORO-managed sites. [Metal smelting facility  

SciTech Connect

Capabilities exist for reducing all the contaminated nickel, aluminum, and copper scrap to ingot form by smelting. Processing these metals at existing facilities could be completed in about 5 or 6 years. However, these metals represent only about 20% of the total metal inventories currently on hand at the DOE/ORO-managed sites. No provisions have been made for the ferrous scrap. Most of the ferrous scrap is unclassified and does not require secured storage. Also, the potential resale value of the ferrous scrap at about $100 per ton is very low in comparison. Consequently, this scrap has been allowed to accumulate. With several modifications and equipment additions, the induction melter at PGDP could begin processing ferrous scrap after its commitment to nickel and aluminum. The PGDP smelter is a retrofit installation, and annual throughput capabilities are limited. Processing of the existing ferrous scrap inventories would not be completed until the FY 1995-2000 time frame. An alternative proposal has been the installation of induction melters at the other two enrichment facilities. Conceptual design of a generic metal smelting facility is under way. The design study includes capital and operating costs for scrap preparation through ingot storage at an annual throughput of 10,000 tons per year. Facility design includes an induction melter with the capability of melting both ferrous and nonferrous metals. After three years of operation with scrapyard feed, the smelter would have excess capacity to support on-site decontamination and decomissioning projects or upgrading programs. The metal smelting facility has been proposed for FY 1984 line item funding with start-up operations in FY 1986.

Mack, J.E.; Williams, L.C.

1982-01-01T23:59:59.000Z

378

New Construction Jobs Begin as Argonne Builds New Energy Research Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Jobs Begin as Argonne Builds New Energy Research Construction Jobs Begin as Argonne Builds New Energy Research Facility New Construction Jobs Begin as Argonne Builds New Energy Research Facility June 3, 2011 - 2:08pm Addthis Senator Richard Durbin, University of Chicago President Robert Zimmer, Secretary Chu, and Argonne Director Eric Isaacs break ground for the new Energy Sciences Building. | Photo Courtesy of Argonne National Laboratory Senator Richard Durbin, University of Chicago President Robert Zimmer, Secretary Chu, and Argonne Director Eric Isaacs break ground for the new Energy Sciences Building. | Photo Courtesy of Argonne National Laboratory Lindsey Geisler Lindsey Geisler Public Affairs Specialist, Office of Public Affairs America has a long tradition of scientific inquiry and breakthroughs. And

379

IBBM-2004 Conference, Asilomar, CA September 2004, to appear in NIMB The ORNL Multicharged Ion Research Facility Upgrade project  

E-Print Network (OSTI)

Research Facility (MIRF) to extend the energy range of multicharged ions available for experimental Research Facility Upgrade project F. W. Meyer* , M. E. Bannister, D. Dowling, J. W. Hale, C. C. Havener, J, France Abstract A new 250 kV high voltage platform has been installed at the ORNL Multicharged Ion

380

EXPERIMENTS, CONCEPTUAL DESIGN, PRELIMINARY COST ESTIMATES AND SCHEDULES FOR AN UNDERGROUND RESEARCH FACILITY  

E-Print Network (OSTI)

surface and underground facilities as we11 as operation andconstruction of the underground facility. However, because

Korbin, G.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Petrophysical properties of saprolites from the Oak Ridge Integrated Field Research Challenge site, Tennessee  

E-Print Network (OSTI)

Petrophysical properties of saprolites from the Oak Ridge Integrated Field Research Challenge site Karaoulis2 ABSTRACT At the Oak Ridge Integrated Field Research Challenge site, near Oak Ridge, Tennessee methods have been used to locate contami- nant migration at the Oak Ridge Integrated Field Research Chal

Hubbard, Susan

382

Corrective Action Decision Document for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 254, R-MAD Decontamination Facility, under the Federal Facility Agreement and Consent Order. Located in Area 25 at the Nevada Test Site in Nevada, CAU 254 is comprised of Corrective Action Site (CAS) 25-23-06, Decontamination Facility. A corrective action investigation for this CAS as conducted in January 2000 as set forth in the related Corrective Action Investigation Plan. Samples were collected from various media throughout the CAS and sent to an off-site laboratory for analysis. The laboratory results indicated the following: radiation dose rates inside the Decontamination Facility, Building 3126, and in the storage yard exceeded the average general dose rate; scanning and static total surface contamination surveys indicated that portions of the locker and shower room floor, decontamination bay floor, loft floor, east and west decon pads, north and south decontamination bay interior walls, exterior west and south walls, and loft walls were above preliminary action levels (PALs). The investigation-derived contaminants of concern (COCs) included: polychlorinated biphenyls, radionuclides (strontium-90, niobium-94, cesium-137, uranium-234 and -235), total volatile and semivolatile organic compounds, total petroleum hydrocarbons, and total Resource Conservation and Recovery Act (Metals). During the investigation, two corrective action objectives (CAOs) were identified to prevent or mitigate human exposure to COCs. Based on these CAOs, a review of existing data, future use, and current operations at the Nevada Test Site, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Unrestricted Release Decontamination and Verification Survey; and Alternative 3 - Unrestricted Release Decontamination and Verification Survey and Dismantling of Building 3126. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors, and the preferred CAA chosen on technical merit was Alternative 2. This CAA was judged to meet all requirements for the technical components evaluated and applicable state and federal regulations for closure of the site, and reduce the potential for future exposure pathways.

U.S. Department of Energy, Nevada Operations Office

2000-06-01T23:59:59.000Z

383

Design and Validation of Control Room Upgrades Using a Research Simulator Facility  

SciTech Connect

Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partnersthe U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI designboth for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

Ronald L. Boring; Vivek Agarwal; Jeffrey C. Joe; Julius J. Persensky

2012-11-01T23:59:59.000Z

384

Environmental Management Construction Project Review of the Savannah River Site Salt Waste Processing Facility, July 19-22, 210  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Independent Oversight's Office of Environment, Safety and Health Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Shadowing of the Environmental Management Construction Project Review of the Savannah River Site Salt Waste Processing Facility on July 19-22, 2010 A Department of Energy Construction Project Review (CPR) of the Salt Waste Processing Facility (SWPF) project was conducted on July 19-22, 2010, at the request of the Principal Deputy Secretary, Office of Environmental Management (EM-2). The purpose of the review was to assess the cost, schedule, and technical progress against the approved Performance Baseline. Specific review areas were Engineering; Commissioning; Environment, Safety, Health, and Quality Assurance; Cost, Schedule, and Risk; and Management and Acquisition.

385

Facility Utilization and Risk Analysis for Remediation of Legacy Transuranic Waste at the Savannah River Site - 13572  

SciTech Connect

Savannah River Nuclear Solutions (SRNS) completed the Accelerated TRU Project for remediating legacy waste at the Savannah River Site with significant cost and schedule efficiencies due to early identification of resources and utilization of risk matrices. Initial project planning included identification of existing facilities that could be modified to meet the technical requirements needed for repackaging and remediating the waste. The project schedule was then optimized by utilization of risk matrices that identified alternate strategies and parallel processing paths which drove the overall success of the project. Early completion of the Accelerated TRU Project allowed SRNS to pursue stretch goals associated with remediating very difficult TRU waste such as concrete casks from the hot cells in the Savannah River National Laboratory. Project planning for stretch goals also utilized existing facilities and the risk matrices. The Accelerated TRU project and stretch goals were funded under the American Recovery and Reinvestment Act (ARRA). (authors)

Gilles, Michael L.; Gilmour, John C. [Savannah River Nuclear Solutions, LLC (United States)] [Savannah River Nuclear Solutions, LLC (United States)

2013-07-01T23:59:59.000Z

386

Technical assistance to Ohio closure sites; Technologies to address leachate from the on-site disposal facility at Fernald Environmental Management Project, Ohio  

SciTech Connect

On August 6-7, 2002, a Technical Assistance Team (''Team'') from the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) met with Fernald Environmental Management Project (FEMP) personnel in Ohio to assess approaches to remediating uranium-contaminated leachate from the On-Site Disposal Facility (OSDF). The Team was composed of technical experts from national labs, technology centers, and industry and was assembled in response to a request from the FEMP Aquifer Restoration Project. Dave Brettschneider of Fluor Fernald, Inc., requested that a Team of experts be convened to review technologies for the removal of uranium in both brine ion exchange regeneration solution from the Advanced Wastewater Treatment facility and in the leachate from the OSDF. The Team was asked to identify one or more technologies for bench-scale testing as a cost effective alternative to remove uranium so that the brine regeneration solution from the Advanced Waste Water Treatment facility and the leachate from the OSDF can be discharged without further treatment. The Team was also requested to prepare a recommended development and demonstration plan for the alternative technologies. Finally, the Team was asked to make recommendations on the optimal technical solution for field implementation. The Site's expected outcomes for this effort are schedule acceleration, cost reduction, and better long-term stewardship implementation. To facilitate consideration of the most appropriate technologies, the Team was divided into two groups to consider the brine and the leachate separately, since they represent different sources with different constraints on solutions, e.g., short-term versus very long-term and concentrated versus dilute contaminant matrices. This report focuses on the technologies that are most appropriate for the leachate from the OSDF. Upon arriving at FEMP, project personnel asked the Team to concentrate its efforts on evaluating potential technologies and strategies to reduce uranium concentration in the leachate.

Hazen, Terry

2002-08-26T23:59:59.000Z

387

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 10, 2012 [Facility News] July 10, 2012 [Facility News] Collaborations in Atmospheric Science and Observations Discussed in Germany Bookmark and Share Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the university's Jülich ObservatorY for Cloud Evolution (JOYCE) site. Crewell explained that JOYCE, like ARM facilities, was designed for long-term continuous measurements of cloud, radiation, boundary humidity, and precipitation, using active and passive remote sensing instruments. Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the

388

The Facility for Antiproton and Ion Research and the Compressed Baryonic Matter Experiment  

Science Journals Connector (OSTI)

The Compressed Baryonic Matter (CBM) experiment will be one of the major scientific activities at the future Facility for Antiproton and Ion Research (FAIR) in Darmstadt. The goal of the CBM research program is to explore the QCD phase diagram in the region of high baryon densities using high?energy nucleus?nucleus collisions. This includes the study of the equation?of?state of nuclear matter at high densities and the search for the deconfinement and chiral phase transitions. The CBM detector is designed to measure both bulk observables with large acceptance and rare diagnostic probes such as charmed particles and vector mesons decaying into lepton pairs. The layout and the physics performance of the proposed CBM experimental facility will be discussed.

P. Senger

2010-01-01T23:59:59.000Z

389

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility  

SciTech Connect

The 216-B-3 Pond system was a series of ponds used for disposal of liquid effluent from past Hanford production facilities. In operation from 1945 to 1997, the B Pond System has been a Resource Conservation and Recovery Act (RCRA) facility since 1986, with RCRA interim-status groundwater monitoring in place since 1988. In 1994 the expansion ponds of the facility were clean closed, leaving only the main pond and a portion of the 216-B-3-3 ditch as the currently regulated facility. In 2001, the Washington State Department of Ecology (Ecology) issued a letter providing guidance for a two-year, trial evaluation of an alternate, intrawell statistical approach to contaminant detection monitoring at the B Pond system. This temporary variance was allowed because the standard indicator-parameters evaluation (pH, specific conductance, total organic carbon, and total organic halides) and accompanying interim status statistical approach is ineffective for detecting potential B-Pond-derived contaminants in groundwater, primarily because this method fails to account for variability in the background data and because B Pond leachate is not expected to affect the indicator parameters. In July 2003, the final samples were collected for the two-year variance period. An evaluation of the results of the alternate statistical approach is currently in progress. While Ecology evaluates the efficacy of the alternate approach (and/or until B Pond is incorporated into the Hanford Facility RCRA Permit), the B Pond system will return to contamination-indicator detection monitoring. Total organic carbon and total organic halides were added to the constituent list beginning with the January 2004 samples. Under this plan, the following wells will be monitored for B Pond: 699-42-42B, 699-43-44, 699-43-45, and 699-44-39B. The wells will be sampled semi-annually for the contamination indicator parameters (pH, specific conductance, total organic carbon, and total organic halides) and annually for water quality parameters (chloride, iron, manganese, phenols, sodium, and sulfate). This plan will remain in effect until superseded by another plan or until B Pond is incorporated into the Hanford Facility RCRA Permit.

Barnett, D BRENT.; Smith, Ronald M.; Chou, Charissa J.; McDonald, John P.

2005-11-01T23:59:59.000Z

390

Type B Accident Investigation Board Report Employee Puncture Wound at the F-TRU Waste Remediation Facility at the Savannah River Site on June 14, 2010  

Energy.gov (U.S. Department of Energy (DOE))

This report documents the results of the Type B Accident Investigation Board investigation of the June 14, 2010, employee puncture wound at the Department of Energy (DOE) Savannah River Site (SRS) F-TRU Wste Facility located in the F Canyon Facility.

391

Referenced-site environmental document for a Monitored Retrievable Storage facility: backup waste management option for handling 1800 MTU per year  

SciTech Connect

This environmental document includes a discussion of the purpose of a monitored retrievable storage facility, a description of two facility design concepts (sealed storage cask and field drywell), a description of three reference sites (arid, warm-wet, and cold-wet), and a discussion and comparison of the impacts associated with each of the six site/concept combinations. This analysis is based on a 15,000-MTU storage capacity and a throughput rate of up to 1800 MTU per year.

Silviera, D.J.; Aaberg, R.L.; Cushing, C.E.; Marshall, A.; Scott, M.J.; Sewart, G.H.; Strenge, D.L.

1985-06-01T23:59:59.000Z

392

Work Controls Assessment Plan Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORK CONTROLS WORK CONTROLS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing

393

Summary - Proposed On-Site Disposal Facility (OSDF) at the Paducah...  

Office of Environmental Management (EM)

was to provide input on (1) the most effective use of the existing RCRA Subtitle D landfill, (2) site considerations such as seismic and brown versus green field, (3) the public...

394

Siting of low-level radioactive waste disposal facilities in Texas  

E-Print Network (OSTI)

in the proper geologic environment. The object of disposal is to prevent exposure of the public to radioactive waste in potentially harmful concentrations. The most likely route for buried wastes to reach the public is through the ground- water system... disposal site for low- level radioactive waste is predictability, A disposal site should "be capable of being characterized, modeled, analyzed and monitored" ISiefken, et al. , 1982). Simplicity and homogeneity with respect to hydrogeologic conditions...

Isenhower, Daniel Bruce

2012-06-07T23:59:59.000Z

395

Utilization of the Philippine Research Reactor as a training facility for nuclear power plant operators  

SciTech Connect

The Philippines has a 1-MW swimming-pool reactor facility operated by the Philippine Atomic Energy Commission (PAEC). The reactor is light-water moderated and cooled, graphite reflected, and fueled with 90% enriched uranium. Since it became critical in 1963 it has been utilized for research, radioisotope production, and training. It was used initially in the training of PAEC personnel and other research institutions and universities. During the last few years, however, it has played a key role in training personnel for the Philippine Nuclear Power Project (PNPP).

Palabrica, R.J.

1981-01-01T23:59:59.000Z

396

Data Quality Assessment and Control for the ARM Climate Research Facility  

SciTech Connect

The mission of the Atmospheric Radiation Measurement (ARM) Climate Research Facility is to provide observations of the earth climate system to the climate research community for the purpose of improving the understanding and representation, in climate and earth system models, of clouds and aerosols as well as their coupling with the Earth's surface. In order for ARM measurements to be useful toward this goal, it is important that the measurements are of a known and reasonable quality. The ARM data quality program includes several components designed to identify quality issues in near-real-time, track problems to solutions, assess more subtle long-term issues, and communicate problems to the user community.

Peppler, R

2012-06-26T23:59:59.000Z

397

Results of Surveys for Special Status Reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory  

SciTech Connect

The purpose of this report is to present the results of a live-trapping and visual surveys for special status reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory (LLNL). The survey was conducted under the authority of the Federal recovery permit of Swaim Biological Consulting (PRT-815537) and a Memorandum of Understanding issued from the California Department of Fish and Game. Site 300 is located between Livermore and Tracy just north of Tesla road (Alameda County) and Corral Hollow Road (San Joaquin County) and straddles the Alameda and San Joaquin County line (Figures 1 and 2). It encompasses portions of the USGS 7.5 minute Midway and Tracy quadrangles (Figure 2). Focused surveys were conducted for four special status reptiles including the Alameda whipsnake (Masticophis lateralis euryxanthus), the San Joaquin Whipsnake (Masticophis Hagellum ruddock), the silvery legless lizard (Anniella pulchra pulchra), and the California horned lizard (Phrynosoma coronanum frontale).

Woollett, J J

2008-09-18T23:59:59.000Z

398

Colorado School of Mines Research Institute Site Data Evaluation Report  

E-Print Network (OSTI)

................................................................................................................... 5 3.2.1 Remedial Investigation/Feasibility Study past site characterization work by a previous consultant and presented in the remedial investigation............................................................... 5 3.2.2 Remedial Action

399

UTM Well Coordinates for the Boise Hydrogeophysical Research Site (BHRS)  

SciTech Connect

A series of oscillatory pumping tests were performed at the BHRS. The data collected from these wells will be used to tomographically image the shallow subsurface. This excel file only contains well coordinates for all wells at the Boise site.

David Lim

2014-12-19T23:59:59.000Z

400

UTM Well Coordinates for the Boise Hydrogeophysical Research Site (BHRS)  

DOE Data Explorer (OSTI)

A series of oscillatory pumping tests were performed at the BHRS. The data collected from these wells will be used to tomographically image the shallow subsurface. This excel file only contains well coordinates for all wells at the Boise site.

David Lim

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Quality Improvement Inspections Take Place Annual Quality Improvement Inspections Take Place Bookmark and Share During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. The Continuous Quality Improvement Program (CQIP) implemented by the ARM Program in 1998 requires annual audits and inspection visits to each of the ARM Climate Research Facility Southern Great Plains (SGP) site's 27 field facilities located in Oklahoma and Kansas. A small team of scientists and engineers conduct the inspections each year to evaluate the field

402

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2009 [Facility News] March 31, 2009 [Facility News] New Sensors Installed for Cloud Radar Calibration at North Slope Bookmark and Share Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Cloud radars at the ARM sites provide important information about cloud properties and continue to evolve in providing climate researchers more complex data. This creates a greater need to know the absolute calibration of the radar reflectivity measurement. However, the large and immobile antenna for the millimeter wavelength cloud radar (MMCR) is impossible to point directly at a calibration target. At the ARM North Slope of Alaska

403

Overview of Innovative PMI Research on NSTX-U and Associated PMI Facilities at PPPL  

SciTech Connect

Developing a reactor compatible divertor and managing the associated plasma material interaction (PMI) has been identified as a high priority research area for magnetic confinement fusion. Accordingly on NSTXU, the PMI research has received a strong emphasis. With ~ 15 MW of auxiliary heating power, NSTX-U will be able to test the PMI physics with the peak divertor plasma facing component (PFC) heat loads of up to 40-60 MW/m2 . To support the PMI research, a comprehensive set of PMI diagnostic tools are being implemented. The snow-flake configuration can produce exceptionally high divertor flux expansion of up to ~ 50. Combined with the radiative divertor concept, the snow-flake configuration has reduced the divertor heat flux by an order of magnitude in NSTX. Another area of active PMI investigation is the effect of divertor lithium coating (both in solid and liquid phases). The overall NSTX lithium PFC coating results suggest exciting opportunities for future magnetic confinement research including significant electron energy confinement improvements, Hmode power threshold reduction, the control of Edge Localized Modes (ELMs), and high heat flux handling. To support the NSTX-U/PPPL PMI research, there are also a number of associated PMI facilities implemented at PPPL/Princeton University including the Liquid Lithium R&D facility, Lithium Tokamak Experiment, and Laboratories for Materials Characterization and Surface Chemistry.

M. Ono, M. Jaworski, R. Kaita, C. N. Skinner, J.P. Allain, R. Maingi, F. Scotti, V.A. Soukhanovskii, and the NSTX-U Team

2012-09-19T23:59:59.000Z

404

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Backup Software Improves Processing, Reliability at Data Management New Backup Software Improves Processing, Reliability at Data Management Facility Bookmark and Share Real-time data from all three of the ARM Climate Research Facility sites (North Slope of Alaska, Southern Great Plains, and Tropical Western Pacific) are collected and processed at the ARM Climate Research Facility Data Management Facility (DMF) each day. Processing involves the application of algorithms for performing simple averaging routines, qualitative comparisons, or more complicated experimental calculations. With continual advances in computer technology, keeping up with the volume and pace of incoming data is a daunting challenge. And because the remote sites do not provide backups, reliable backups of these data at the DMF are critical. In addition, significant numbers of value-added datasets are

405

Vegetation communities associated with the 100-Area and 200-Area facilities on the Hanford Site  

SciTech Connect

The Hanford Site, Benton County, Washington, lies within the broad semi-arid shrub-steppe vegetation zone of the Columbia Basin. Thirteen different habitat types on the Hanford Site have been mapped in Habitat Types on the Hanford Site: Wildlife and Plant Species of Concern (Downs et al. 1993). In a broad sense, this classification is correct. On a smaller scale, however, finer delineations are possible. This study was conducted to determine the plant communities and estimate vegetation cover in and directly adjacent to the 100 and 200 Areas, primarily in relation to waste sites, as part of a comprehensive ecological study for the Compensation Environmental Response, Compensation, and Liability Act (CERCLA) characterization of the 100 and 200 Areas. During the summer of 1993, field surveys were conducted and a map of vegetation communities in each area, including dominant species associations, was produced. The field surveys consisted of qualitative community delineations. The community delineations described were made by field reconnaissance and are qualitative in nature. The delineations were made by visually determining the dominant plant species or vegetation types and were based on the species most apparent at the time of inspection. Additionally, 38 transects were run in these plant communities to try to obtain a more accurate representation of the community. Because habitat disturbances from construction/operations activities continue to occur in these areas, users of this information should be cautious in applying these maps without a current ground survey. This work will complement large-scale habitat maps of the Hanford Site.

Stegen, J.A.

1994-01-17T23:59:59.000Z

406

Environmental assessment for the decommissioning and decontamination of contaminated facilities at the Laboratory for Energy-Related Health Research University of California, Davis  

SciTech Connect

The Laboratory for Energy-Related Health Research (LEHR) was established in 1958 at its present location by the Atomic Energy Commission. Research at LEHR originally focused on the health effects from chronic exposures to radionuclides, primarily strontium 90 and radium 226, using beagles to simulate radiation effects on humans. In 1988, pursuant to a memorandum of agreement between the US Department of Energy (DOE) and the University of California, DOE`s Office of Energy Research decided to close out the research program, shut down LEHR, and turn the facilities and site over to the University of California, Davis (UCD) after remediation. The decontamination and decommissioning (D&D) of LEHR will be managed by the San Francisco Operations Office (SF) under DOE`s Environmental Restoration Program. This environmental assessment (EA) addresses the D&D of four site buildings and a tank trailer, and the removal of the on-site cobalt 60 (Co-60) source. Future activities at the site will include D&D of the Imhoff building and the outdoor dog pens, and may include remediation of underground tanks, and the landfill and radioactive disposal trenches. The remaining buildings on the LEHR site are not contaminated. The environmental impacts of the future activities cannot be determined at this time because the extent of contamination has not yet been ascertained. The impacts of these future activities (including the cumulative impacts of the future activities and those addressed in this EA) will be addressed in future National Environmental Policy Act (NEPA) documentation.

Not Available

1992-09-01T23:59:59.000Z

407

Allowable residual contamination levels for decommissioning the 115-F and 117-F facilities at the Hanford Site  

SciTech Connect

This report contains the results of a study sponsored by UNC Nuclear Industries to determine Allowable Residual Contamination Levels (ARCL) for the 115-F and 117-F facilities at the Hanford Site. The purpose of this study is to provide data useful to UNC engineers in conducting safety and cost comparisons for decommissioning alternatives. The ARCL results are based on a scenario/exposure-pathway analysis and compliance with an annual dose limit for three specific modes of future use of the land and facilities. These modes of use are restricted, controlled, and unrestricted. Information on restricted and controlled use is provided to permit a full consideration of decommissioning alternatives. Procedures are presented for modifying the ARCL values to accommodate changes in the radionuclide mixture or concentrations and to determine instrument responses for various mixtures of radionuclides. Finally, a comparison is made between existing decommissioning guidance and the ARCL values calculated for unrestricted release of the 115-F and 117-F facilities. The comparison shows a good agreement.

Kennedy, W.E. Jr.; Napier, B.A.

1983-07-01T23:59:59.000Z

408

Recent ORNL experience in site performance prediction: the Gas Centrifuge Enrichment Plant and the Oak Ridge Central Waste Disposal Facility  

SciTech Connect

The suitability of the Portsmouth Gas Centrifuge Enrichment Plant Landfill and the Oak Ridge, Tennessee, Central Waste Disposal Facility for disposal of low-level radioactive waste was evaluated using pathways analyses. For these evaluations, a conservative approach was selected; that is, conservatism was built into the analyses when assumptions concerning future events had to be made or when uncertainties concerning site or waste characteristics existed. Data from comprehensive laboratory and field investigations were used in developing the conceptual and numerical models that served as the basis for the numerical simulations of the long-term transport of contamination to man. However, the analyses relied on conservative scenarios to describe the generation and migration of contamination and the potential human exposure to the waste. Maximum potential doses to man were calculated and compared to the appropriate standards. Even under this conservative framework, the sites were found to provide adequate buffer to persons outside the DOE reservations and conclusions concerning site capacity and site acceptability were drawn. Our experience through these studies has shown that in reaching conclusions in such studies, some consideration must be given to the uncertainties and conservatisms involved in the analyses. Analytical methods to quantitatively assess the probability of future events to occur and to quantitatively determine the sensitivity of the results to data uncertainty may prove useful in relaxing some of the conservatism built into the analyses. The applicability of such methods to pathways analyses is briefly discussed.

Pin, F.G.

1985-01-01T23:59:59.000Z

409

Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index  

SciTech Connect

This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

NONE

1988-12-01T23:59:59.000Z

410

Evaluation of the 183-D Water Filtration Facility for Bat Roosts and Development of a Mitigation Strategy, 100-D Area, Hanford Site  

SciTech Connect

The 183-D Water Filtration Facility is located in the 100-D Area of the Hanford Site, north of Richland, Washington. It was used to provide filtered water for cooling the 105-D Reactor and supplying fire-protection and drinking water for all facilities in the 100-D Area. The facility has been inactive since the 1980s and is now scheduled for demolition. Therefore, an evaluation was conducted to determine if any part of the facility was being used as roosting habitat by bats.

Lindsey, C. T.; Gano, K. A.; Lucas, J. G.

2011-03-07T23:59:59.000Z

411

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2013 [Facility News] 4, 2013 [Facility News] Work Cut Out for ARM Science Board Bookmark and Share With a new fixed site on the horizon in the Azores, a third ARM Mobile Facility gearing up for action in the Arctic, and more aircraft probes and sensors than scientists can shake a stick at, the ARM Facility continues to expand its considerable suite of assets for conducting climate research. Along with this impressive inventory comes the responsibility to ensure the Facility is supporting the highest-value science possible. Enter the ARM Science Board. This eleven-member group annually reviews complex proposals for use of the ARM mobile and aerial facilities. To maintain excellence and integrity in the review process, each member serves a renewable term of two years, with membership updated annually.

412

Argonne Breaks Ground on $34.5M MX Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Stephenson Appointed ALD for Photon Sciences Stephenson Appointed ALD for Photon Sciences APS, Other DOE Labs Help Develop New Cancer Fighting Drug Paper on Fast Pharmaceuticals by APS Authors Featured in New Journal Art Scene Investigation: Picasso goes Nanotech Linda Young of APS Elected Vice Chair of DAMOP APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Argonne Breaks Ground on $34.5M MX Research Facility SEPTEMBER 15, 2011 Bookmark and Share Artist's rendering of the Advanced Protein Crystallization Facility (left in drawing). The Advanced Photon Source experiment hall is at right. The U.S. Department of Energy's (DOE's) Argonne National Laboratory broke ground on August 30, 2011, for a $34.5 million Advanced Protein

413

Low Prevalence of Chronic Beryllium Disease among Workers at a Nuclear Weapons Research and Development Facility  

SciTech Connect

To study the prevalence of beryllium sensitization (BeS) and chronic beryllium disease (CBD) in a cohort of workers from a nuclear weapons research and development facility. We evaluated 50 workers with BeS with medical and occupational histories, physical examination, chest imaging with HRCT (N=49), and pulmonary function testing. Forty of these workers also underwent bronchoscopy for bronchoalveolar lavage (BAL) and transbronchial biopsies. The mean duration of employment at the facility was 18 yrs and the mean latency (from first possible exposure) to time of evaluation was 32 yrs. Five of the workers had CBD at the time of evaluation (based on histology or HRCT); three others had evidence of probable CBD. These workers with BeS, characterized by a long duration of potential Be exposure and a long latency, had a low prevalence of CBD.

Arjomandi, M; Seward, J P; Gotway, M B; Nishimura, S; Fulton, G P; Thundiyil, J; King, T E; Harber, P; Balmes, J R

2010-01-11T23:59:59.000Z

414

DOE site facility mgt contracts Internet Posting 5-2-11.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/30/2011 6/30/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 Bill Creech 859-219-4044 West Valley Demonstration Project EM West Valley Environmental Svcs 6/29/2007 6/30/2011 6/30/2011 Site Clean up 2007 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Ralph Holland 513-246-0550 Derrick Franklin 513-246-0103 Argonne National Laboratory SC UChicago Argonne, LLC 7/31/2006 9/30/2011 4 yrs Award Term Earned/additional 11 yrs Award

415

Process centrifuge operating problems and equipment failures in canyon reprocessing facilities at the Savannah River Site  

SciTech Connect

The Savannah River Laboratory (SRL) maintains a compilation of operating problems and equipment failures that have occurred in the fuel reprocessing areas of the Savannah River Site (SRS). At present, the data bank contains more than 230,000 entries ranging from minor equipment malfunctions to incidents with the potential for injury or contamination of personnel, or for economic loss. The data bank has been used extensively for a wide variety of purposes, such as failure analyses, trend analyses, and preparation of safety analyses. Typical of the data are problems associated with the canyon process centrifuges. This report contains a compilation of the centrifuge operating problems and equipment failures primarily as an aid to organizations with related equipment. Publication of these data was prompted by a number of requests for this information by other Department of Energy (DOE) sites. 11 refs., 2 figs., 4 tabs.

Durant, W.S.; Baughman, D.F.

1990-03-01T23:59:59.000Z

416

Towards an Experimental Testbed Facility for Cyber-Physical Security Research  

SciTech Connect

Cyber-Physical Systems (CPSs) are under great scrutiny due to large Smart Grid investments and recent high profile security vulnerabilities and attacks. Research into improved security technologies, communication models, and emergent behavior is necessary to protect these systems from sophisticated adversaries and new risks posed by the convergence of CPSs with IT equipment. However, cyber-physical security research is limited by the lack of access to universal cyber-physical testbed facilities that permit flexible, high-fidelity experiments. This paper presents a remotely-configurable and community-accessible testbed design that integrates elements from the virtual, simulated, and physical environments. Fusing data between the three environments enables the creation of realistic and scalable environments where new functionality and ideas can be exercised. This novel design will enable the research community to analyze and evaluate the security of current environments and design future, secure, cyber-physical technologies.

Edgar, Thomas W.; Manz, David O.; Carroll, Thomas E.

2012-01-07T23:59:59.000Z

417

Ground Broken for New Job-Creating Accelerator Research Facility at DOEs Fermi National Accelerator Laboratory in Illinois  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, D.C. Today, ground was broken for a new accelerator research facility being built at the Department of Energys (DOEs) Fermi National Accelerator Laboratory (Fermilab) in Batavia,...

418

Solar Energy Research Institute Validation Test House Site Handbook  

SciTech Connect

The Validation Test House at the Solar Energy Research Institute in Golden, Colorado, is being used to collect performance data for analysis/design tool validation as part of the DOE Passive Solar Class A Performance Evaluation Program.

Burch, J.; Wortman, D.; Judkoff, R.; Hunn, B.

1985-05-01T23:59:59.000Z

419

Located between Snyder Hill Road and Ellis Hollow Road, this precinct is at the periphery of the main campus and is home to the research facilities used by the College of Veterinary  

E-Print Network (OSTI)

fields. · Site and building designs should adhere to sustainable design principles. General Guidelines of the main campus and is home to the research facilities used by the College of Veterinary Medicine a defined spine running north to south along Hungerford road. The Baker Laboratory and its support buildings

Chen, Tsuhan

420

ARM - Site Index  

NLE Websites -- All DOE Office Websites (Extended Search)

govSite Index govSite Index Expand | Collapse Site Index Videos Image Library About ARM About ARM (home) ARM and the Recovery Act ARM and the Recovery Act (home) ARM Recovery Act Project FAQs Recovery Act Instruments ARM Climate Research Facility Contributions to International Polar Year (IPY) ARM Climate Research Facility Contributions to International Polar Year (IPY) (home) ARM Education and Outreach Efforts Support IPY Research Support for International Polar Year (IPY) ARM Organization ARM Organization (home) Laboratory Partners ARM Safety Policy ARM Science Board ARM Science Board (home) Board Business Become a User Comments and Questions Contacts Contacts (home) ARM Engineering and Operations Contacts Facility Statistics Facility Statistics (home) Historical Field Campaign Statistics

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE/SC-ARM-020 Atmospheric Radiation Measurement Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

20 20 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report July 1-September 30, 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

422

DOE/SC-ARM-12-021 Atmospheric Radiation Measurement Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report July 1-September 30, 2012 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

423

DOE/SC-ARM-13-020 Atmospheric Radiation Measurement Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report July 1-September 30, 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or

424

Sociopolitical Challenges to the Siting of Facilities with Perceived Environmental Risks Gemma Aymonne Heddle  

E-Print Network (OSTI)

............................................................................................................................... Howard Herzog Principal Research Engineer, Laboratory for Energy and the Environment Thesis Supervisor and Engineering Systems Director, Laboratory for Energy and the Environment Accepted by Aymonne Heddle M.E.S., Environmental Engineering (1999) University of Sydney B.E. (Honors), Civil

425

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2007 [Facility News] September 30, 2007 [Facility News] Atqasuk Joins International Network of Meteorological Stations Bookmark and Share On the skydeck at Atqasuk, the new met pack (above right) and GPS receiver (circled at left) acquire data for the SuomiNet. On the skydeck at Atqasuk, the new met pack (above right) and GPS receiver (circled at left) acquire data for the SuomiNet. At the North Slope of Alaska, the ARM operates a research site in the remote town of Atqasuk, Alaska, to provide continental Arctic data to the climate research community. The Atqasuk site is proving useful to climate modelers since this inland site is more homogenous and uniform than coastal sites during summer months. Enhancements to the instrument suite in Atqasuk last year led to a recent addition that solidified Atqasuk's position on

426

Recent characterization activities of Midway Valley as a potential repository surface facility site  

SciTech Connect

Midway Valley, located at the eastern base of Yucca Mountain, Nye County, Nevada, has been identified as a possible location for the surface facilities of a potential high-level nuclear-waste repository. This structural and topographic valley is bounded by two north- trending, down-to-the-west normal faults: the Paintbrush Canyon fault on the east and the Bow Ridge fault on the west. Surface and near-surface geological data have been acquired from Midway Valley during the past three years with particular emphasis on evaluating the existence of Quaternary faults. A detailed (1:6000) surficial geological map has been prepared based on interpretation of new and existing aerial photographs, field mapping, soil pits, and trenches. No evidence was found that would indicate displacement of these surficial deposits along previously unrecognized faults. However, given the low rates of Quaternary faulting and the extensive areas that are covered by late Pleistocene to Holocene deposits south of Sever Wash, Quaternary faulting between known faults cannot be precluded based on surface evidence alone. Middle to late Pleistocene alluvial fan deposits (Unit Q3) exist at or near the surface throughout Midway Valley. Confidence is increased that the potential for surface fault rupture in Midway Valley can be assessed by excavations that expose the deposits and soils associated with Unit Q3 or older units (middle Pleistocene or earlier).

Gibson, J.D. [Sandia National Labs., Albuquerque, NM (United States); Wesling, J.R.; Swan, F.H.; Bullard, T.F. [Geomatrix Consultants, Inc., San Francisco, CA (United States)

1992-01-31T23:59:59.000Z

427

Welding Cutting and Brazing Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WELDING, CUTTING AND BRAZING WELDING, CUTTING AND BRAZING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: This assessment is to verify hot work requirements associated with welding, cutting, burning, brazing, grinding and other spark- or flame-producing operations have been implemented. Verify that the requirements implemented are appropriate for preventing loss of life and property from fire, and personal injury from contact with or exposure to molten metals, vapors, radiant energy, injurious rays and sparks. Criteria: Establish designated area in which routine and repetitive welding, cutting, and other spark- or flame producing operations are conducted [1910.252(a)(2)(iv),1910.252(a)(2)(vi)(A), 1910.252(a)(2)(xv), General Requirements].

428

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Main Text and Appendixes A-H 1: Main Text and Appendixes A-H June 2004 U.S. Department of Energy Office of Environmental Management Cover Sheet Portsmouth DUF 6 Conversion Final EIS iii COVER SHEET * RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Ports_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

429

Remedial investigation of the High Explosives Burn Pit facility, Building 829 complex, Lawrence Livermore National Laboratory site 300  

SciTech Connect

To assess any impact on the environment resulting from operations at the High Explosives (HE) Burn Pits at Lawrence Livermore National Laboratory (LLNL) Site 300, we evaluated the soil, rock, and ground water beneath the burn pit facility. Between November 16, 1986, and January 12, 1987, we drilled eight exploratory holes; one was converted to a monitor well, and another was converted to a piezometer. Seven holes were drilled, geologically logged, and sampled to determine the concentration and extent of substances that may have infiltrated to the subsurface from the burn pits. The eighth hole was completed as a monitor well but was not sampled, and no detailed log was prepared. Electric logging was performed in one exploratory hole further evaluate the geologic conditions. 27 refs., 4 figs., 6 tabs.

Webster-Scholten, C.P.; Crow, N.B.

1989-08-01T23:59:59.000Z

430

Site Characterization Plan for the Old Hydrofracture Facility at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect

The aboveground structures of the Old Hydrofracture Facility (OHF) at Oak Ridge National Laboratory (ORNL) are scheduled for decontamination and decommissioning (D&D). This Site Characterization Plan presents the strategy and techniques to be used to characterize the OHF D&D structures in support of D&D planning, design, and implementation. OHF is located approximately 1 mile southwest of the main ORNL complex. From 1964 to 1979, OHF was used in the development and full-scale application of hydrofracture operations in which 969,000 gal of liquid low-level waste (LLLW) was mixed with grout and then injected under high pressure into a low-permeability shale formation approximately 1/6 mile underground.

Not Available

1994-01-01T23:59:59.000Z

431

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at Portsmouth, Ohio, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Portsmouth DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site (DOE/EIS-0360) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Ports_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

432

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Comment and Response Document 2: Comment and Response Document June 2004 U.S. Department of Energy Office of Environmental Management Comment & Response Document Paducah DUF 6 Conversion Final EIS iii COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process,

433

Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Main Text and Appendixes A-H 1: Main Text and Appendixes A-H June 2004 U.S. Department of Energy Office of Environmental Management Cover Sheet Paducah DUF 6 Conversion Final EIS iii COVER SHEET * RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site (DOE/EIS-0359) CONTACT: For further information on this environmental impact statement (EIS), contact: Gary S. Hartman DOE-ORO Cultural Resources Management Coordinator U.S. Department of Energy-Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 37831 e-mail: Pad_DUF6@anl.gov phone: 1-866-530-0944 fax: 1-866-530-0943 For general information on the DOE National Environmental Policy Act (NEPA) process, contact:

434

Measuring and Testing Equipment Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measuring and Test Equipment Measuring and Test Equipment Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to determine whether a program is in place which assures that Measuring and Test Equipment (M&TE) used in activities affecting quality and safety are properly controlled, calibrated, and adjusted at specified times to maintain accuracy within necessary limits. Criteria: All M&TE is uniquely identified, calibrated, controlled, and provides accuracy traceability. A recall program maintains the total inventory and status of all M&TE. Out-of-tolerance M&TE is removed from service. Plant equipment calibrated with out-of-tolerance M&TE is evaluated in a timely manner for impact on previous output, current operability and is re-

435

Measuring and Testing Equipment Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measuring and Test Equipment Measuring and Test Equipment Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The objective of this assessment is to determine whether a program is in place which assures that Measuring and Test Equipment (M&TE) used in activities affecting quality and safety are properly controlled, calibrated, and adjusted at specified times to maintain accuracy within necessary limits. Criteria: All M&TE is uniquely identified, calibrated, controlled, and provides accuracy traceability. A recall program maintains the total inventory and status of all M&TE. Out-of-tolerance M&TE is removed from service. Plant equipment calibrated with out-of-tolerance M&TE is evaluated in a timely manner for impact on previous output, current operability and is re-

436

Machine Shop Safe Operations Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2003 - Machine Shop Safe Operations July 2003 - Machine Shop Safe Operations Utilize 29 CFR 1910 Utilize applicable LLNL, LANL, DTRA, BN procedures VALUE ADDED FOR: AMTS Contractor Assurance Focus Area AMTS ISM Improvements Focus Area AMTS Safety Precursors/Hazards Analysis Focus Area AMTS Environment, Safety, & Health Division MACHINE SHOP SAFE OPERATIONS Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is to verify that machine shop operators are provided a safe and healthful workplace which will reduce or prevent injuries, illnesses, and accidental losses. Criteria: A worker protection program shall be implemented that provides a place of employment free from recognized hazards that are causing or likely to cause

437

Self-Assessment Program Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SELF-ASSESSMENT SELF-ASSESSMENT Assessment Plan NNSA/Nevada Site Office Independent Oversight Division Performance Objective: Management should ensure that effective management and independent self- assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect people and

438

Environmentally based siting assessment for synthetic-liquid-fuels facilities. Final report  

SciTech Connect

A detailed assessment of the major environmental constraints to siting a synthetic fuels industry and the results of that assessment are used to determine on a regional basis the potential for development of such an industry with minimal environmental conflicts. Secondly, the ability to mitigate some of the constraining impacts through alternative institutional arrangements, especially in areas that are judged to have a low development potential is also assessed. Limitations of the study are delineated, but specifically, the study is limited geographically to well-defined boundaries that include the prime coal and oil shale resource areas. The critical factors used in developing the framework are air quality, water availability, socioeconomic capacity, ecological sensitivity, environmental health, and the management of Federally owned lands. (MCW)

None

1980-01-01T23:59:59.000Z

439

Small-scale Facilities for Gas Clean Up and Carbon Capture Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Henry W. Pennline Henry W. Pennline Chemical Engineer National Energy Technology Laboratory 626 Cochrans Mill Road P.O. Box 10940 Pittsburgh, PA 15236-0940 412-386-6013 henry.pennline@netl.doe.gov Diane (DeeDee) Newlon Technology Transfer Manager National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880 Morgantown, WV 26507 304-285-4086 r.diane.newlon@netl.doe.gov Small-Scale FacilitieS For GaS clean Up and carbon captUre reSearch Capabilities The Department of Energy's (DOE) National Energy Technology Laboratory (NETL) is conducting research on the cleanup of gas produced either by the combustion or gasification of fossil fuels. This effort directly supports the goal of various DOE technology programs (i.e., Carbon Sequestration, Gasification, etc.) to ensure the continued utilization of coal in an environmentally and economically

440

The design of the CPRF (Confinement Physics Research Facility) control system  

SciTech Connect

The Confinement Physics Research Facility (CPRF), currently under construction at Los Alamos, is a facility for research into the plasma confinement properties of various magnetic field configurations. The first device to be tested in the CPRF will be ZTH, a reversed field pinch. The CPRF/ZTH control system has been designed as a distributed system with four major semi-independent subsystems. Each subsystem will be capable of stand-alone operation for purposes of commissioning and maintenance. The subsystem controller hardware has been selected; it will consist of commercially available programmable logic controllers (PLCs) linked by a fast fiber optic network. The man-machine interface, which is under procurement as of June, 1989, will have multiple graphic workstations interfaced to the PLC fiber optic network. The central control console will initially have three stations. Permanent local stations will be located at two of the subsystems with a transportable station serving the remaining subsystems. Standard process control software will be used, but the selection criteria emphasize the open architecture of the system so that user programs can be easily integrated. 2 figs.

Wilkins, R.W.; Klingner, P.L. (Los Alamos National Lab., NM (USA))

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "research facility sites" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Finding of no significant impact shipment of stabilized mixed waste from the K-25 Site to an off-site commercial disposal facility, Oak Ridge K-25 Site, Oak Ridge, Tennessee  

SciTech Connect

The Department of Energy (DOE) has prepared an Environmental Assessment (EA) for the shipment of stabilized mixed waste, removed from K-1407-B and -C ponds, to an off-site commercial disposal facility (Envirocare) for permanent land disposal. Based on the analysis in the EA, DOE has determined that the proposed action is not a major federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1994-12-31T23:59:59.000Z

442

Development of a Comprehensive Plan for Scientific Research, Exploration, and Design: Creation of an Undergroung Radioactive Waste Isloation Facility at the Nizhnekansky Rock Massif  

SciTech Connect

ISTC Partner Project No.2377, ''Development of a General Research and Survey Plan to Create an Underground RW Isolation Facility in Nizhnekansky Massif'', funded a group of key Russian experts in geologic disposal, primarily at Federal State Unitary Enterprise All-Russian Design and Research Institute of Engineering Production (VNIPIPT) and Mining Chemical Combine Krasnoyarsk-26 (MCC K-26) (Reference 1). The activities under the ISTC Partner Project were targeted to the creation of an underground research laboratory which was to justify the acceptability of the geologic conditions for ultimate isolation of high-level waste in Russia. In parallel to this project work was also under way with Minatom's financial support to characterize alternative sections of the Nizhnekansky granitoid rock massif near the MCC K-26 site to justify the possibility of creating an underground facility for long-term or ultimate isolation of radioactive waste (RW) and spent nuclear fuel (SNF). (Reference 2) The result was a synergistic, integrated set of activities several years that advanced the geologic repository site characterization and development of a proposed underground research laboratory better than could have been expected with only the limited funds from ISTC Partner Project No.2377 funded by the U.S. DOE-RW. There were four objectives of this ISTC Partner Project 2377 geologic disposal work: (1) Generalize and analyze all research work done previously at the Nizhnekansky granitoid massif by various organizations; (2) Prepare and issue a declaration of intent (DOI) for proceeding with an underground research laboratory in a granite massif near the MCC K-26 site. (The DOI is similar to a Record of Decision in U.S. terminology). (3) Proceeding from the data obtained as a result of scientific research and exploration and design activities, prepare a justification of investment (JOI) for an underground research laboratory in as much detail as the available site characterization data allow. Consider the possibility of the substantiated selection of a specific site for the underground laboratory at this stage. (The JOI is similar to an advanced conceptual design or preliminary design in U.S. terminology). (4) Perform a preliminary safety assessment of the geologic isolation of radioactive waste and unreprocessable spent nuclear fuel (SNF) in the Nizhnekansky massif. Significant progress has been made toward fulfilling the joint project objectives. The results were documented in a series of quarterly reports and one final report over a period of {approx}2 3/4 years.

Jardine, L J

2005-06-15T23:59:59.000Z

443

Building America Technology Solutions for New and Existing Homes: Cold Climate Foundation Wall Hygrothermal Research Facility (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE))

This case study describes the research conducted at the University of Minnesotas Cloquet Residential Research Facility (CRRF) in northern Minnesota, which features more than 2,500 ft2 of below-grade space for building systems foundation hygrothermal research. Here, the NorthernSTAR Building America Partnership team researches ways to improve the energy efficiency of the building envelope, including wall assemblies, basements, roofs, insulation, and air leakage.

444

AMERICAN INDIANS AND THE NEVADA TEST SITE A MODEL OF RESEARCH...  

National Nuclear Security Administration (NNSA)

3046-2001 OO1 AMERICAN INDIANS AND THE NEVADA TEST SITE A MODEL OF RESEARCH AND CONSULTATION Richard W. Stoffle, Maria Nieves Zedeno, and David B. Halmo, editors Bureau of Applied...

445

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2008 [Data Announcements, Facility News] May 15, 2008 [Data Announcements, Facility News] Announcing the Release of the Radiative Flux Analysis PI Product Bookmark and Share Developed by Dr. Chuck Long, Radiative Flux Analysis PI Product data are now available from the ARM Climate Research Facility Archive. The current release includes data for all of the ARM fixed sites (except Darwin, which requires manual processing because of the monsoon season) plus data for the AMF deployments at Pt. Reyes and the COPS Black Forest site. Future releases will include data for Darwin, the COPS Hornisgrinde and Rhine Valley sites, and the AMF Niamey deployment. The Radiative Flux Analysis is a technique for using surface shortwave (SW) and longwave (LW) broadband radiation measurements for detecting periods of

446

A PUBLICATION OF DOE'S SAVANNAH RIVER SITE NATIONAL ENVIRONMENTAL RESEARCH PARK  

E-Print Network (OSTI)

#12;A PUBLICATION OF DOE'S SAVANNAH RIVER SITE NATIONAL ENVIRONMENTAL RESEARCH PARK April 1990 River Ecology Laboratory Drawer E Aiken, SC 29802 USA #12;VEGETATION OF THE SAVANNAH RIVER SITE: MAJOR COMMUNITY TYPES Sarah W. Workman Kenneth W. McLeod Savannah River Ecology Laboratory A Publication

Georgia, University of

447

Formic acid requirement for the Savannah River Site Defense Waste Processing Facility melter feed preparation  

SciTech Connect

The Westinghouse Savannah River Company (WSRC) will vitrify the high-level radioactive waste into a borosilicate glass wasteform using a slurry-fed, joule-heated melter. Formic acid is used to treat the sludge slurry for melter feed preparation. Both a minimum formate requirement and a maximum allowable formate level need to be established to adequately prepare the sludge for melter feed. The data from the Savannah River Laboratory (SRL) Scale Glass Melter (SGM), Integrated DWPF Melter System (IDMS), and research mini-melter runs were used for this purpose. The stoichiometry for major reactions during formic acid treatment was revised to reflect the more predominant chemical reactions and their yields. A minimum formic acid requirement was established according to this revised stoichiometry. Methods for determining the minimum level of formic acid were specified. An operating envelope that includes the maximum total formate level and the minimum nitrate levels, was also proposed. 5 refs., 3 figs., 4 tabs.

Hsu, C.W.

1991-01-01T23:59:59.000Z

448

EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico  

Energy.gov (U.S. Department of Energy (DOE))

This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

449

Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3A/5A/6A/6B/7A/9A  

SciTech Connect

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in a new facility at Savannah River Site (SRS).

DiSabatino, A., LLNL

1998-06-01T23:59:59.000Z

450

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2009 [Facility News] 27, 2009 [Facility News] Arrival of Recovery Act Funds Sets Wheels In Motion Bookmark and Share So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. Through the American Recovery and Reinvestment Act of 2009 (aka stimulus), the Department of Energy's Office of Science received $1.2 billion. In late May, DOE released approximately $54 million-90 percent-of the $60 million allocated to the ARM Climate Research Facility. During the next 18 months, the ARM Climate Research Facility will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several

451

TWP Darwin Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Darwin Site Darwin Site TWP Related Links Facilities and Instruments Manus Island Nauru Island Darwin, AUS ES&H Guidance Statement Operations Science Field Campaigns Year of Tropical Convection Visiting the Site TWP Fact Sheet Images Information for Guest Scientists Contacts TWP Darwin Site Location: 12° 25' 28.56" S, 130° 53' 29.75" E Altitude: 29.9 meters The third TWP climate research facility was established in April 2002 in Darwin, Northern Territory, Australia. The facility is situated adjacent to the Australian Bureau of Meteorology's (BOM) Meteorological Office near Darwin International Airport. Darwin was chosen because it meets the scientific goal of the ARM Program, providing a unique set of climate regimes that are not seen at the other TWP facilities. Annually, Darwin