National Library of Energy BETA

Sample records for requires internet posting

  1. DOE Site Facility Management Contracts Internet Posting | Department...

    Energy Savers [EERE]

    DOE Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November...

  2. DOE Site Facility Management Contracts Internet Posting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Site Facility Management Contracts Internet Posting DOE Site Facility Management Contracts Internet Posting PDF icon DOE NNSA Site Facility Management Contracts - November 2015.pdf More Documents & Publications DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE site facility mgt contracts Internet Posting 5-2-11.xlsx DOE Facility Management Contracts

  3. 2013-04-12 1.1 H-FM&T Mod 020 (Admin)(EditedForInternet Posting).pdf

    National Nuclear Security Administration (NNSA)

    Intentionally left blank for Internet posting purposes.

  4. DOE site facility mgt contracts Internet Posting 5-2-11.xlsx | Department

    Energy Savers [EERE]

    of Energy site facility mgt contracts Internet Posting 5-2-11.xlsx DOE site facility mgt contracts Internet Posting 5-2-11.xlsx PDF icon DOE site facility mgt contracts Internet Posting 5-2-11.xlsx More Documents & Publications DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE Facility Management Contracts DOE Site Facility Management Contracts Internet Posting

  5. DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf |

    Energy Savers [EERE]

    Department of Energy DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf PDF icon DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11(1).pdf More Documents & Publications DOE site facility mgt contracts Internet Posting 5-2-11.xlsx DOE Facility Management Contracts DOEfacilitymgt_contractsownership_01052011.pdf

  6. DOE_site_facility_mgt_contracts_Internet_Posting_3-21-11.pdf...

    Broader source: Energy.gov (indexed) [DOE]

    .pdf More Documents & Publications DOEMajorSiteFacilityContracts2-2011.pdf DOEsitefacilitymgtcontractsInternetPosting3-21-11(1)...

  7. IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS

    SciTech Connect (OSTI)

    M.A. Ebadian, Ph.D.

    1999-01-01

    The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

  8. POSTED

    Office of Legacy Management (LM)

    / I_ ^ Department of Energy Washington, DC 20545 POSTED / OCT 13 1988 ii' 2". _. * Mr. Jonathan Strauss The Ravenswood Venture 875 North Michigan Ave., Rm. 3707 Chicago, Illinois 60611 Dear Mr. Strauss: As you are aware, the Department of Energy is implementing a radiological survey program to determine the radiological conditions at sites that were formerly used by the Department's predecessor agencies. One such site is Ravenswood Venture site (formerly Quality Hardware & Machine

  9. Energy Internet

    Broader source: Energy.gov [DOE]

    Energy Internet is commercializing a software platform for decentralized scheduling of energy-producing or consuming assets on the electricity grid. This scalable system will revolutionize the control of distributed solar generation, electric vehicle charging, intelligent appliances and other smart grid technologies.

  10. Dimeric c-di-GMP is required for post-translational regulation of alginate production in Pseudomonas aeruginosa

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Whitney, John C.; Robinson, Howard; Whitfield, Gregory B.; Marmont, Lindsey S.; Yip, Patrick; Neculai, A. Mirela; Lobsanov, Yuri D.; Ohman, Dennis E.; Howell, P. Lynne

    2015-05-15

    Pseudomonas aeruginosa is an opportunistic human pathogen that secretes the exopolysaccharide alginate during infection of the respiratory tract of individuals afflicted with cystic fibrosis and chronic obstructive pulmonary disease. Among the proteins required for alginate production, Alg44 has been identified as an inner membrane protein whose bis-(3',5')-cyclic dimeric guanosine monophosphate (c-di-GMP) binding activity post-translationally regulates alginate secretion. In this study, we report the 1.8 Å crystal structure of the cytoplasmic region of Alg44 in complex with dimeric self-intercalated c-di-GMP and characterize its dinucleotide-binding site using mutational analysis. The structure shows that the c-di-GMP binding region of Alg44 adopts a PilZmore » domain fold with a dimerization mode not previously observed for this family of proteins. Moreover, calorimetric binding analysis of residues in the c-di-GMP binding site demonstrate that mutation of Arg-17 and Arg-95 alters the binding stoichiometry between c-di-GMP and Alg44 from 2:1 to 1:1. Introduction of these mutant alleles on the P. aeruginosa chromosome show that the residues required for binding of dimeric c-di-GMP in vitro are also required for efficient alginate production in vivo. Our results suggest that the dimeric form of c-di-GMP represents the biologically active signaling molecule needed for the secretion of an important virulence factor produced by P. aeruginosa.« less

  11. 2013-04-12 1.2 H-FM&T Mod 029 (Admin)(Edited for Internet Posting Purposes).pdf

    National Nuclear Security Administration (NNSA)

    Honeywell FM&T, LLC Modification No. 029 Contract No. DE-NA0000622 Section J, Appendix A, Page i SECTION J APPENDIX A STATEMENT OF WORK 09/19/12 TABLE OF CONTENTS CHAPTER I. OBJECTIVES, SCOPE, AND REQUIREMENTS ......................................................................... 1 1.0 OBJECTIVE .................................................................................................................................................. 1 2.0 BACKGROUND

  12. Property Postings - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Property Postings The Department of Energy has provided the following lists of Excess Property currently available from the Savannah River Site. How to Acquire DOE Property BMG Contact Information If you need more information on the listed items, please call BMG at 803-496-0100 Available Property Postings Note: If using the Internet Explorer, version 9 or later is needed to view the lists properly. Property lists posted at 1:55 p.m. on February 11, 2016: SRCRO16019 SRCRO16065 SRCRO16068

  13. DOE's General Counsel Announces New Policy Requiring Online Posting of NEPA Categorical Exclusion Determinations to Further Transparency

    Broader source: Energy.gov [DOE]

    Washington, DC - Consistent with the President's commitment to "disclose information rapidly in forms that the public can readily find and use," DOE announced today a new policy requiring all DOE...

  14. Production Pathways and Separation Procedures for High-Diagnostic-Value Activation Species, Fission Products, and Actinides Required for Preparation of Realistic Synthetic Post-Detonation Nuclear Debris

    SciTech Connect (OSTI)

    Faye, S A; Shaughnessy, D A

    2015-08-19

    The objective of this project is to provide a comprehensive study on the production routes and chemical separation requirements for activation products, fission products, and actinides required for the creation of realistic post-detonation surrogate debris. Isotopes that have been prioritized by debris diagnosticians will be examined for their ability to be produced at existing irradiation sources, production rates, and availability of target materials, and chemical separation procedures required to rapidly remove the products from the bulk target matrix for subsequent addition into synthetic debris samples. The characteristics and implications of the irradiation facilities on the isotopes of interest will be addressed in addition to a summary of the isotopes that are already regularly produced.

  15. Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Certificate in Renewable Energy and the Environment Requirements Earn this certificate by completing a total of 11 points from the following categories: Courses (minimum 4 points) For more information about courses, contact Erin Plut (eplut@wustl.edu) 100 - 200 Level Course Earn 1 point Receive a grade of B- or better in a 2.00 or 3.00 unit course 300 - 400 Level Course Earn 2 points Receive a grade of C or better in a 2.00 or more unit course Independent Study Earn 3 points Students may arrange

  16. Internet Performance to Africa

    SciTech Connect (OSTI)

    Cottrell, L

    2003-10-01

    We report the first results ever for real-time Internet performance to Africa using the PingER methodology. Multiple monitoring hosts were used to enable comparisons with performance from different parts of the world. From these preliminary measurements, we have found that Internet packet losses to some African sites in recent months range from very poor to bad (> 12%), some getting better, others are holding steady or getting worse. This, together with the average monthly Round Trip Times, imply end-to-end maximum TCP throughputs that are order of magnitudes different between countries in the region. Africa is shown to be far from the Internet performance in industrialized nations due to the poor infrastructure in place today. These monitoring efforts can provide valuable information to analyze the relative rates of future improvement and today they help us to quantify the digital divide and can provide quantitative information to policy makers.

  17. Internet of Things | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internet of Things The Internet of Things is the network of physical objects accessed through the Internet, as defined by technology analysts and visionaries. The Internet of Things is the network of physical objects accessed through the Internet, as defined by technology analysts and visionaries. While possibly creating efficiencies in areas such as advanced manufacturing and infrastructure design, production and resilience, the Internet of Things (IOT) also creates new and unknown

  18. An Overview of Internet biosurveillance

    SciTech Connect (OSTI)

    Hartley, David M.; Nelson, Noele P.; Arthur, Ray; Barboza, P.; Collier, Nigel; Lightfoot, Nigel; Linge, J. P.; van der Goot, E.; Mawudeku, A.; Madoff, Lawrence; Vaillant, L.; Walters, Ronald A.; Yangarber, Roman; Mantero, Jas; Corley, Courtney D.; Brownstein, John S.

    2013-06-21

    Internet biosurveillance utilizes unstructured data from diverse Web-based sources to provide early warning and situational awareness of public health threats. The scope of source coverage ranges from local based media in the vernacular to international media in widely read languages. Internet biosurveillance is a timely modality available to government and public health officials, health care workers, and the public and private sector, serving as a real-time complementary approach to traditional indicator-based public health disease surveillance methods. Internet biosurveillance also supports the broader activity of epidemic intelligence. This review covers the current state of the field of Internet biosurveillance and provides a perspective on the future of the field.

  19. Geo-Engineering through Internet Informatics (GEMINI)

    SciTech Connect (OSTI)

    Doveton, John H.; Watney, W. Lynn

    2003-03-06

    The program, for development and methodologies, was a 3-year interdisciplinary effort to develop an interactive, integrated Internet Website named GEMINI (Geo-Engineering Modeling through Internet Informatics) that would build real-time geo-engineering reservoir models for the Internet using the latest technology in Web applications.

  20. RCRA post-closure permits

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits (including treatment, storage, and disposal permits; research, development, and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits) are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  1. Controls: The unsung hero of the industrial internet revolution...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Industrial Internet Revolution Vince Epperson 2015.08.03 You've probably heard about Big Data, the Industrial Internet and the (Industrial) Internet of Things. There are many...

  2. V-149: Microsoft Internet Explorer Object Access Bug Lets Remote...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Microsoft Internet Explorer Object Access Bug Lets Remote Users Execute Arbitrary Code V-149: Microsoft Internet Explorer Object Access Bug Lets Remote Users Execute Arbitrary...

  3. U-262: Microsoft Internet Explorer Flaw Lets Remote Users Execute...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Microsoft Internet Explorer Flaw Lets Remote Users Execute Arbitrary Code U-262: Microsoft Internet Explorer Flaw Lets Remote Users Execute Arbitrary Code September 18, 2012 -...

  4. All Job Postings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... And Algorithms Posted: Thu, 07 Jan 2016 Financial Systems Analyst (Financial Systems ... Job Number: IRC47079 Organization: XCP-6Plasma Theory & Applications Posted: Mon, 23 Nov ...

  5. DOE Challenge Home, California Program Requirements

    Broader source: Energy.gov [DOE]

    DOE Challenge Home, California Program Requirements, as posted on the U.S. Department of Energy's DOE Challenge Home website.

  6. Industrial Dojo Program Fosters Industrial Internet Development...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dojo,' Contributes to Open Source to Foster Continued Development of the Industrial Internet Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new...

  7. Postings Archives-2014 | Department of Energy

    Energy Savers [EERE]

    4 Postings Archives-2014 sslamerica_webbutton_fi_54d.jpg This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, as well as timely discussions of critical issues impacting the development and acceptance of solid-state lighting. If you wish to link to or reference an issue of the Postings, we ask that you comply with the following requirements: Request

  8. Postings Archives—2015

    Broader source: Energy.gov [DOE]

    This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, and...

  9. Posting Date: July 16, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 16, 2015 Posting Close Date: TBD North American Industry Classification System (NAICS) code for the request: 812332 Estimated Subcontract/PO Value TBD Estimated Period of Performance 8-03-15 Estimated RFP/RFQ Release Date: TBD Estimated Award Date: FY 2018 Competition Type: Open Buyer Contact Email: pbeauparlant@lanl.gov Title: Radioactive Laundry and Respirator Services Description of Product or Service Required Radioactive Laundry and Respirator Services * Current forecasted bid

  10. The Internet of Things Helping Utilities | OpenEI Community

    Open Energy Info (EERE)

    The Internet of Things Helping Utilities Home > Groups > Smart Grid Dc's picture Submitted by Dc(266) Contributor 16 October, 2014 - 12:21 The Internet of Things (IoT) is helping...

  11. July 2014 Cybersecurity Awareness Campaign - Internet Safety | Department

    Office of Environmental Management (EM)

    of Energy July 2014 Cybersecurity Awareness Campaign - Internet Safety July 2014 Cybersecurity Awareness Campaign - Internet Safety More Documents & Publications January 2015 Cybersecurity Awareness Campaign - Phishing 2014 NCSAM Campaign January 2014 Cybersecurity Awareness Campaign - Secure Online Shopping

  12. From: Post 2011 Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inform BPA of willingness to host regional meetings Sign up to receive future communication regarding the Post-2011 Review BPA will issue a final scoping document later...

  13. Postings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications » Postings Postings SSL IN AMERICA, A growing number of companies are working hard to create and strengthen an SSL manufacturing base here in the U. This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, and examine technology trends and performance issues related to solid-state lighting. If you wish to link to or reference an issue of the

  14. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    Order 3.3 Documents posted in Section 1 will include contractual documents, financial documents, proposals, proprietary reports and other proprietary documents as required ...

  15. Energy Innovation Portal Post

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 27th, 2010 Thanks for your interest in the Energy Innovation Portal and the Portal Post There are many updates happening to the Energy Innovation Portal to keep users up...

  16. Post Doctoral Fellows Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Post Doctoral Fellows Program The aim of G. T. Seaborg Institute Post Doctoral Fellows Program is to advance nuclear science in a comprehensive project that ties targeted research with Los Alamos mission imperatives. Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Seaborg Nuclear Science Fellowships for Signatures, Energy, Security, Environment will support research in nuclear science relevant to

  17. LS-PrePost

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LS-PrePost Training Course Introductory Course: Developing Compute-efficient, Quality Models with LS-PrePost 3 on the TRACC Cluster A central point for computational structural mechanics training provides all the US organizations doing transportation related research with awareness and accessibility to the latest approaches, methods, software training and best practices that can be applied to the wide variety of transportation research needed to ensure a viable transportation infrastructure.

  18. Microsoft PowerPoint - Durango Solar Leasing Prebid Meeting for Internet posting.ppt

    Office of Legacy Management (LM)

    Debbie Barr Jalena Dayvault Dr. Laura Kilpatrick November 15, 2011 U.S. Department of Energy Office of Legacy Management Bidders Conference and Site Visit U.S. Department of Energy (DOE) Photovoltaic Solar Project Bidders Conference Durango, Colorado November 15, 2011 Office of Legacy Management Office of Site Operations 3 3 Presentation Outline Durango Disposal Site Durango Disposal Cell Background Disposal Cell Facts Disposal Cell Protectiveness Disposal Site: Long-Term Surveillance Plan 4 4

  19. DOE site facility mgt contracts Internet Posting 5-2-11.xlsx

    Office of Environmental Management (EM)

    6/30/2011 2 three month option periods until protest resolved 9/30/2011 M&O 1999 http://www.id.energy.gov/PSD/AMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 Paducah Remediation EM LATA Environmental Services of Kentucky 4/22/2010 7/21/2015 7/21/2015 Site Clean up 2009 http://www.emcbc.doe.gov/dept/contracting/primecontracts.php Pam Thompson 859-219-4056 Bill Creech 859-219-4044 West Valley Demonstration Project EM West Valley Environmental Svcs 6/29/2007 6/30/2011

  20. Audio Requirements

    Broader source: Energy.gov [DOE]

    Audio-only fileswhether they are downloaded from a page or distributed via a podcastmust be accessible to all visitors of the EERE website. For developing and posting audio-only files, follow...

  1. GE Scientist Stephan Biller Discusses the Industrial Internet...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manufacturing Scientist Stephan Biller Discusses the Industrial Internet Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to...

  2. National Clean Energy Business Plan Competition: Energy Internet...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Internet Wins ACC Clean Energy Challenge National Clean Energy Business Plan ... novel wave energy technologies, high-efficiency woodstoves, and biofuels production. ...

  3. JLab Posts OSHA Form 300 for 2015 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    JLab Posts OSHA Form 300 for 2015 In accordance with the U.S. Department of Labor's Occupational Safety and Health Administration (OSHA) requirements, Jefferson Lab is posting its calendar year 2015 Recordable Injuries and Illnesses report. This report must remain publicly posted from February 1 - April 30, 2016. For more information about environment, safety and health programs at Jefferson Lab, please visit the ESH&Q Division webpage: http://www.jlab.org/ehs/ Click here for Jefferson Lab's

  4. National Environmental Policy Act Postings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Environmental Policy Act Postings National Environmental Policy Act Postings To further transparency and openness in its implementation of the National Environmental Policy Act (NEPA) process, the U.S. Department of Energy (DOE) established a policy and, subsequently, requirements under the Department's NEPA regulations (10 CFR Part 1021) and NEPA Order (DOE Order 451.1B) to document and post online its categorical exclusion (CX) determinations involving classes of actions listed in

  5. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  6. Hanford Site Beryllium Posting and Labeling Requirements Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DateSection Changed Change Details 1 31913, Misc. changes as listed Minor editorial changes throughout. 1.0, added callout to Attachment 1. 5.2, directed reader to...

  7. post-99.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ETL Instrumentation on R/V Ronald H. Brown for the Nauru99 Campaign M. J. Post, C. W. Fairall, D. A. Hazen, R. M. Hardesty, W. L. Eberhard, and B. E. Martner National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado E. R. Westwater Cooperative Institute for Research in Environmental Sciences University of Colorado Boulder, Colorado V. G. Wulfmeyer National Center for Atmospheric Research Boulder, Colorado Introduction The 1996 Combined Sensor Program

  8. Next-gen RF MEMS Switch for a Smarter, Faster Internet of Things...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RF MEMS Switch for a Smarter, Faster Internet of Things Karen Lightman 2014.03.28 Big Data. Internet of Things. Quantified Self. Connected Home. Connected City. These...

  9. Animation Requirements

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  10. LLNL-POST-411531

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POST-411531 This work is supported by the Office of Science of the United States Department of Energy as part of the ARM program. This work was performed under the auspices of the U. S. Department of Energy by Lawrence Livermore National Laboratory under contract DE-AC52-07NA27344. Cloud simulations in developmental versions of the Community Atmosphere Model (CAM) are assessed with ARM and other observations. The CAM is integrated in weather-forecast or CAPT mode to facilitate comparison with

  11. My First Gamble With Internet Based Currency | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    My First Gamble With Internet Based Currency Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window)...

  12. An Open Source project building the framework for the Internet...

    Broader source: Energy.gov (indexed) [DOE]

    with the Internet of Things Today NOW PLAYING: Artist: Flowers Song: Daisy Fridge Cloud Laundry Cloud Lighting B Cloud Speaker B Cloud Speaker A Cloud TV Cloud Lighting A...

  13. T-593: Microsoft Internet Explorer unspecified code execution

    Broader source: Energy.gov [DOE]

    Unspecified vulnerability in Microsoft Internet Explorer 8 on Windows 7 allows remote attackers to bypass Protected Mode and create arbitrary files by leveraging access to a Low integrity process.

  14. Within a Stone's Throw: Proximal Geolocation of Internet Users via Covert Wireless Signaling

    SciTech Connect (OSTI)

    Paul, Nathanael R; Shue, Craig; Taylor, Curtis

    2013-01-01

    While Internet users may often believe they have anonymity online, a culmination of technologies and recent research may allow an adversary to precisely locate an online user s geophysical location. In many cases, such as peer-to-peer applications, an adversary can easily use a target s IP address to quickly obtain the general geographical location of the target. Recent research has scoped this general area to a 690m (0.43 mile) radius circle. In this work, we show how an adversary can exploit Internet communication for geophysical location by embedding covert signals in communication with a target on a remote wireless local area network. We evaluated the approach in two common real-world settings: a residential neighborhood and an apartment building. In the neighborhood case, we used a single-blind trial in which an observer located a target network to within three houses in less than 40 minutes. Directional antennas may have allowed even more precise geolocation. This approach had only a 0.38% false positive rate, despite 24,000 observed unrelated packets and many unrelated networks. This low rate allowed the observer to exclude false locations and continue searching for the target. Our results enable law enforcement or copyright holders to quickly locate online Internet users without requiring time-consuming subpoenas to Internet Service Providers. Other privacy use cases include rapidly locating individuals based on their online speech or interests. We hope to raise awareness of these issues and to spur discussion on privacy and geolocating techniques.

  15. OSTI Pact with Internet Archive Ensures Uninterrupted Research Access |

    Office of Scientific and Technical Information (OSTI)

    OSTI, US Dept of Energy, Office of Scientific and Technical Information OSTI Pact with Internet Archive Ensures Uninterrupted Research Access One sure thing about the World Wide Web: like the weather, it will change. Given this dynamic nature of the Web and the importance of preservation of scientific information in a digital environment, OSTI recently partnered with Internet Archive to ensure uninterrupted access to more than 1 million online research papers from the E-print Network. The

  16. GE Scientist Stephan Biller Discusses the Industrial Internet | GE Global

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Manufacturing Scientist Stephan Biller Discusses the Industrial Internet Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Manufacturing Scientist Stephan Biller Discusses the Industrial Internet Stephan Biller, Chief Manufacturing Scientist at GE Global Research, talked with the Farstuff Podcast about the

  17. Zephyr: A secure Internet process to streamline engineering

    SciTech Connect (OSTI)

    Jordan, C.W.; Niven, W.A.; Cavitt, R.E.

    1998-05-12

    Lawrence Livermore National Laboratory (LLNL) is implementing an Internet-based process pilot called `Zephyr` to streamline engineering and commerce using the Internet. Major benefits have accrued by using Zephyr in facilitating industrial collaboration, speeding the engineering development cycle, reducing procurement time, and lowering overall costs. Programs at LLNL are potentializing the efficiencies introduced since implementing Zephyr. Zephyr`s pilot functionality is undergoing full integration with Business Systems, Finance, and Vendors to support major programs at the Laboratory.

  18. Industrial Dojo Program Fosters Industrial Internet Development | GE Global

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Launches Cloud Foundry 'Industrial Dojo,' Contributes to Open Source to Foster Continued Development of the Industrial Internet Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) GE Launches Cloud Foundry 'Industrial Dojo,' Contributes to Open Source to Foster Continued Development of the Industrial Internet

  19. 30 TAC, part 1, chapter 39, rule 39.604 Sign Posting | Open Energy...

    Open Energy Info (EERE)

    Abstract These rules outline the sign posting requirements for public notice of air quality permit applications in Texas. Published NA Year Signed or Took Effect 1999...

  20. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  1. Eligibility Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligibility and required supporting documentation The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to enroll in the HDHP medical plan. NOTE:

  2. Competition Requirements

    Office of Environmental Management (EM)

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  3. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  4. Posting Date: July 16, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 16, 2015 Posting Close Date: TBD North American Industry Classification System (NAICS) code for the request: 812332 Estimated SubcontractPO Value TBD Estimated Period of...

  5. Assessing Internet energy intensity: A review of methods and results

    SciTech Connect (OSTI)

    Coroama, Vlad C.; Hilty, Lorenz M.; Empa, Swiss Federal Laboratories for Materials Science and Technology, Lerchenfeldstr. 5, 9014 St. Gallen; Centre for Sustainable Communications, KTH Royal Institute of Technology, Lindstedtsvgen 5, 100 44 Stockholm

    2014-02-15

    Assessing the average energy intensity of Internet transmissions is a complex task that has been a controversial subject of discussion. Estimates published over the last decade diverge by up to four orders of magnitude from 0.0064 kilowatt-hours per gigabyte (kWh/GB) to 136 kWh/GB. This article presents a review of the methodological approaches used so far in such assessments: i) topdown analyses based on estimates of the overall Internet energy consumption and the overall Internet traffic, whereby average energy intensity is calculated by dividing energy by traffic for a given period of time, ii) model-based approaches that model all components needed to sustain an amount of Internet traffic, and iii) bottomup approaches based on case studies and generalization of the results. Our analysis of the existing studies shows that the large spread of results is mainly caused by two factors: a) the year of reference of the analysis, which has significant influence due to efficiency gains in electronic equipment, and b) whether end devices such as personal computers or servers are included within the system boundary or not. For an overall assessment of the energy needed to perform a specific task involving the Internet, it is necessary to account for the types of end devices needed for the task, while the energy needed for data transmission can be added based on a generic estimate of Internet energy intensity for a given year. Separating the Internet as a data transmission system from the end devices leads to more accurate models and to results that are more informative for decision makers, because end devices and the networking equipment of the Internet usually belong to different spheres of control. -- Highlights: Assessments of the energy intensity of the Internet differ by a factor of 20,000. We review topdown, model-based, and bottomup estimates from literature. Main divergence factors are the year studied and the inclusion of end devices. We argue against extending the Internet system boundary beyond data transmission. Decision-makers need data that differentiates between end devices and transmission.

  6. DOE SSL Postings: October 13, 2015, issue

    Energy Savers [EERE]

    systems and the Internet of Things (IoT)? We know that SSL technology, by its very nature, facilitates the integration of intelligence, network interfaces, and sensors into...

  7. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. ...

  8. Deployment Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contamination Workshop Deployment Requirements William Buttner National Renewable Energy Laboratory Hydrogen Safety Codes and Stands Group DOE Hydrogen Contamination Workshop Troy, Michigan June 13, 2014 THIS PRESENTATION DOES NOT CONTAIN ANY PROPRIETARY, CONFIDENTIAL OR OTHERWISE RESTRICTED INFORMATION 2 Outline of talk * SAE 2719 Requirements and the HCD Detector * Application Scenarios - Discreet vs. "real-time" - Centralized vs. On-site * Sensor Performance Parameters -

  9. Post-Combustion Carbon Capture Research | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Combustion Carbon Capture Research Post-Combustion Carbon Capture Research Fossil fuel fired electric generating plants are the cornerstone of America's central power system. Currently, the existing fossil fuel fleet accounts for about two-thirds of all electricity generated domestically, over 40% from coal alone. Electricity demand is expected to increase dramatically over the next 30 years, and adding new generating capacity typically requires long lead time. In the meantime, the United

  10. Internet-Based Calibration of a Multifunction Calibrator

    SciTech Connect (OSTI)

    BUNTING BACA,LISA A.; DUDA JR.,LEONARD E.; WALKER,RUSSELL M.; OLDHAM,NILE; PARKER,MARK

    2000-12-19

    A new way of providing calibration services is evolving which employs the Internet to expand present capabilities and make the calibration process more interactive. Sandia National Laboratories and the National Institute of Standards and Technology are collaborating to set up and demonstrate a remote calibration of multijunction calibrators using this Internet-based technique that is becoming known as e-calibration. This paper describes the measurement philosophy and the Internet resources that can provide real-time audio/video/data exchange, consultation and training, as well as web-accessible test procedures, software and calibration reports. The communication system utilizes commercial hardware and software that should be easy to integrate into most calibration laboratories.

  11. Internet-based calibration of a multifunction calibrator

    SciTech Connect (OSTI)

    BUNTING BACA,LISA A.; DUDA JR.,LEONARD E.; WALKER,RUSSELL M.; OLDHAM,NILE; PARKER,MARK

    2000-04-17

    A new way of providing calibration services is evolving which employs the Internet to expand present capabilities and make the calibration process more interactive. Sandia National Laboratories and the National Institute of Standards and Technology are collaborating to set up and demonstrate a remote calibration of multifunction calibrators using this Internet-based technique that is becoming known as e-calibration. This paper describes the measurement philosophy and the Internet resources that can provide real-time audio/video/data exchange, consultation and training, as well as web-accessible test procedures, software and calibration reports. The communication system utilizes commercial hardware and software that should be easy to integrate into most calibration laboratories.

  12. GE Showcases Industrial Internet Innovations and Promotes Win-Win

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cooperation at 2015 TECHfest | GE Global Research Showcases Industrial Internet Innovations and Promotes Win-Win Cooperation at 2015 TECHfest Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) GE Showcases Industrial Internet Innovations and Promotes Win-Win Cooperation at 2015 TECHfest GE China Technology Center teams

  13. High-Speed Network Enables Industrial Internet | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unveils High-Speed Network Infrastructure to Connect Machines, Data and People at Light Speed to the Industrial Internet Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) GE Unveils High-Speed Network Infrastructure to Connect Machines, Data and People at Light Speed to the Industrial Internet New fiber optic network

  14. Latest information posted January 21, 2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information posted January 21, 2016 The 7th US/German Workshop on Salt Repository Research, Design, and Operation will be held at the Embassy Suites by Hilton Crystal City - National Airport on September 7-9, 2016. * Due to DOE requirements, we will not be able to open the conference registration until mid-May 2016, at which time we will add the links to the 7th Workshop website for the conference registration/payment and hotel registration * Conference registration/fee payments will be closed

  15. Competition Requirements

    Office of Environmental Management (EM)

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  16. Competition Requirements

    Office of Environmental Management (EM)

    ---------------------------- --------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement

  17. Posting Date: 1/27/2016 Posting Close Date: 2/3/2016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /27/2016 Posting Close Date: 2/3/2016 North American Industry Classification System (NAICS) code for the request: 236220 Estimated Subcontract/PO Value: TBD Estimated Period of Performance 2 Months Estimated RFP/RFQ Release Date: 2/4/2016 Estimated Award Date: 3/4/2016 Competition Type: SB Set-Aside Buyer Contact Email: amyp@lanl.gov Title: SII Locker Room Expansion Description of Product or Service Required Perform all required demolition and dispose of all removed materials. Furnish and

  18. RCRA post-closure permits. RCRA Information Brief

    SciTech Connect (OSTI)

    Coalgate, J.

    1993-02-01

    The Resource Conservation and Recovery Act (RCRA) requires that hazardous waste management facilities operate in accordance with permits granted by the US Environmental Protection Agency (EPA) or a State authorized to carry out the RCRA Subtitle C program. Several categories of permits, including treatment,storage, and disposal permits; research, development and demonstration permits; post-closure permits; emergency permits; permits-by-rule; and trial burn and land treatment demonstration permits are issued under the RCRA Subtitle C program. This Information Brief focuses on post-closure permitting requirements under 40 CFR 270.1(c).

  19. U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual    2. Publish Post Competition Accountability Report on the LM internet. Quarterly    3. Conduct independent evaluations of key programs, projects, or technical issues by goal using external auditors. Annual    4. Augment LM

  20. U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal using external auditors. Annual   4. Augment LM Federal staff

  1. V-058: Microsoft Internet Explorer CDwnBindInfo Object Reuse...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Microsoft Internet Explorer CDwnBindInfo Object Reuse Flaw Lets Remote Users Execute Arbitrary Code V-058: Microsoft Internet Explorer CDwnBindInfo Object Reuse Flaw Lets Remote...

  2. Geography-based structural analysis of the Internet

    SciTech Connect (OSTI)

    Kasiviswanathan, Shiva; Eidenbenz, Stephan; Yan, Guanhua

    2010-01-01

    In this paper, we study some geographic aspects of the Internet. We base our analysis on a large set of geolocated IP hop-level session data (including about 300,000 backbone routers, 150 million end hosts, and 1 billion sessions) that we synthesized from a variety of different input sources such as US census data, computer usage statistics, Internet market share data, IP geolocation data sets, CAJDA's Skitter data set for backbone connectivity, and BGP routing tables. We use this model to perform a nationwide and statewide geographic analysis of the Internet. Our main observations are: (1) There is a dominant coast-to-coast pattern in the US Internet traffic. In fact, in many instances even if the end-devices are not near either coast, still the traffic between them takes a long detour through the coasts. (2) More than half of the Internet paths are inflated by 100% or more compared to their corresponding geometric straight-line distance. This circuitousness makes the average ratio between the routing distance and geometric distance big (around 10). (3) The weighted mean hop count is around 5, but the hop counts are very loosely correlated with the distances. The weighted mean AS count (number of ASes traversed) is around 3. (4) The AS size and the AS location number distributions are heavy-tailed and strongly correlated. Most of the ASes are medium sized and there is a wide variability in the geographic dispersion size (measured in terms of the convex hull area) of these ASes.

  3. Energy Efficiency Post-2011 Implementation Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the local level; and, Impact on local vendors and suppliers. BPA plans to create an internet presence (e.g., via BPA's existing website or the forthcoming Conduit website) to...

  4. 2013-04-12 1.2 H-FM&T Mod 029 (Admin)(Edited for Internet Posting...

    National Nuclear Security Administration (NNSA)

    ... pertinent information such as reasons, costs, dates, and numbers of impacted employees. ... Part IV, Onsite Review Handbook, July 1995 Energy and Environmental Sustainability Site ...

  5. The Evolution of the Internet Community and the"Yet-to-Evolve" Smart Grid Community: Parallels and Lessons-to-be-Learned

    SciTech Connect (OSTI)

    McParland, Charles

    2009-11-06

    The Smart Grid envisions a transformed US power distribution grid that enables communicating devices, under human supervision, to moderate loads and increase overall system stability and security. This vision explicitly promotes increased participation from a community that, in the past, has had little involvement in power grid operations -the consumer. The potential size of this new community and its member's extensive experience with the public Internet prompts an analysis of the evolution and current state of the Internet as a predictor for best practices in the architectural design of certain portions of the Smart Grid network. Although still evolving, the vision of the Smart Grid is that of a community of communicating and cooperating energy related devices that can be directed to route power and modulate loads in pursuit of an integrated, efficient and secure electrical power grid. The remaking of the present power grid into the Smart Grid is considered as fundamentally transformative as previous developments such as modern computing technology and high bandwidth data communications. However, unlike these earlier developments, which relied on the discovery of critical new technologies (e.g. the transistor or optical fiber transmission lines), the technologies required for the Smart Grid currently exist and, in many cases, are already widely deployed. In contrast to other examples of technical transformations, the path (and success) of the Smart Grid will be determined not by its technology, but by its system architecture. Fortunately, we have a recent example of a transformative force of similar scope that shares a fundamental dependence on our existing communications infrastructure - namely, the Internet. We will explore several ways in which the scale of the Internet and expectations of its users have shaped the present Internet environment. As the presence of consumers within the Smart Grid increases, some experiences from the early growth of the Internet are expected to be informative and pertinent.

  6. MARCH 2016 POSTINGS | Department of Energy

    Energy Savers [EERE]

    MARCH 2016 POSTINGS MARCH 2016 POSTINGS PDF icon March 17, 2016: Understanding TM-30 PDF icon March 8, 2016: SSL in America-Spotlight on Echelon More Documents & Publications Evaluating Color Rendition Using IES TM-30-15 August 2015 POSTINGS January 2016 POSTINGS

  7. POST-REMEDIAL ACTION REPORT

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT . FORTHE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA SEPTEMBER 1995 Prepared for United States' Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACQ5-910R2 1949 Gchtel National, 1nc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r FIGURES iv . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  8. DOE Posting Practices | Department of Energy

    Energy Savers [EERE]

    Posting Practices DOE Posting Practices PDF icon APGA Email on DOE Posting Practices PDF icon EERE-2014-BT-STD-0031-0002 before and now-c PDF icon DOE Posting Practices_ Response to APGA Email PDF icon APGA Reponse to DOE Posting Practices_Email.pdf More Documents & Publications RE: EERE-2014-BT-STD-0031 AGA/APGA Questions re Pre-publication Furnace NOPR Furnaces Data

  9. Posting Date: 12/17/15 Posting Close Date: 12/24/15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/17/15 Posting Close Date: 12/24/15 North American Industry Classification System (NAICS) code for the request: 236220 Estimated Subcontract/PO Value: TBD Estimated Period of Performance N/A Estimated RFP/RFQ Release Date: 12/15/16 Estimated Award Date: 5/15/16 Competition Type: Not Set-Aside Buyer Contact Email: ajsaunders@lanl.gov Title: Off-Site Built Laboratory Description of Product or Service Required This project will provide a new permanent laboratory building to support the on-going

  10. Patent: Post polymerization cure shape memory polymers | DOEpatents

    Office of Scientific and Technical Information (OSTI)

    Post polymerization cure shape memory polymers Citation Details Title: Post polymerization cure shape memory polymers

  11. Associated Post Office Box 117

    Office of Legacy Management (LM)

    Associated Post Office Box 117 Oak Ridge Tennessee 37831 -01 17 Energy Enuronmerl! Systems DIWSIO~I September 7, 1990 ? -iAsWP / Fll ,- ,) 3 Mr. Alexander Williams Office of Environmental Restoration and Waste Management U.S. Department of Energy Washington, DC 20545 Subject: PRELIMINARY SITE VISIT - REVERE COPPER AND BRASS CORP. Dear Mr. Williams: This letter is in response to your request concerning the results of the preliminary site visit to the former Revere Copper and Brass Corporation

  12. LM Annual Post Competition Accountability Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LM Annual Post Competition Accountability Reports LM Annual Post Competition Accountability Reports Third Annual Post Competition Accountability Report Second Annual Post Competition Accountability Report First Annual Post Competition Accountability Report

  13. H-35 DOE-H-__ Compliance With Internet Protocol Version 6 (Ipv6...

    Broader source: Energy.gov (indexed) [DOE]

    H-35 DOE-H- Compliance With Internet Protocol Version 6 (Ipv6) In Acquiring Information Technology (July 2011) Prescription: Use as appropriate. Consider using in solicitations...

  14. The Department of Energys Implementation of Voice over Internet...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation of Voice over Internet Protocol Telecommunications Networks DOEIG-0915 June 2014 U.S. Department of Energy Office of Inspector General Office of Audits and...

  15. Entanglement percolation on a quantum internet with scale-free and clustering characters

    SciTech Connect (OSTI)

    Wu Liang; Zhu Shiqun

    2011-11-15

    The applicability of entanglement percolation protocol to real Internet structure is investigated. If the current Internet can be used directly in the quantum regime, the protocol can provide a way to establish long-distance entanglement when the links are pure nonmaximally entangled states. This applicability is primarily due to the combination of scale-free degree distribution and a high level of clustering, both of which are widely observed in many natural and artificial networks including the current Internet. It suggests that the topology of real Internet may play an important role in entanglement establishment.

  16. How To Setup EA Landing Page As Default Home Page For Internet Explorer |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Internet Explorer How To Setup EA Landing Page As Default Home Page For Internet Explorer STEP 1: In Internet Explorer enter the URL http://energy.gov/iea/. Once the EA site loads, click on the Home (Alt + M) drop-down list (highlighted with the red arrow and box). STEP 1: In Internet Explorer enter the URL http://energy.gov/iea/. Once the EA site loads, click on the Home (Alt + M) drop-down list (highlighted with the red arrow and box). STEP 2: Choose “Add or

  17. How To Setup EHSS Landing Page As Default Home Page For Internet Explorer |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Internet Explorer How To Setup EHSS Landing Page As Default Home Page For Internet Explorer STEP 1: In Internet Explorer enter the URL http://energy.gov/ehss/. Once the EHSS site loads, click on the Home (Alt + M) drop-down list (highlighted with the red arrow and box). STEP 1: In Internet Explorer enter the URL http://energy.gov/ehss/. Once the EHSS site loads, click on the Home (Alt + M) drop-down list (highlighted with the red arrow and box). STEP 2: Choose “Add

  18. December 2014 Postings | Department of Energy

    Energy Savers [EERE]

    December 2014 Postings December 2014 Postings PDF icon Dec. 2, 2014: The Outlook for SSL Manufacturing in the U.S. PDF icon Dec. 10, 2014: Even Deeper Energy Savings PDF icon Dec....

  19. OCTOBER 2015 POSTINGS | Department of Energy

    Energy Savers [EERE]

    OCTOBER 2015 POSTINGS OCTOBER 2015 POSTINGS PDF icon October 28, 2015: Lighting the Motor City's Streets PDF icon October 20, 2015: A Solid-State Lighting Workshop That's Not to Be...

  20. POST 10/Truck Inspection Station (Map 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    POST 10/Truck Inspection Station (Map 3) Changes Effective January 11, 2010 Pajarito Corridor Deliveries: Drivers of commercial delivery trucks headed to the Pajarito Corridor (Pajarito Road bounded by NM Highway 4 and Diamond Drive) must stop at Post 10 for truck inspections. Drivers will then need to present time-stamped inspection passes from Post 10 to protective force offcers stationed at the Pajarito Corridor. (Drivers exiting Post 10 should (1) turn right and proceed west on the Truck

  1. Second Annual Post Competition Accountability Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Second Annual Post Competition Accountability Report Second Annual Post Competition Accountability Report LM has completed its second annual Post Competition Accountability Report - Office of Legacy Management's High Performing Organization: Fiscal Year (FY) 2013 PDF icon Second Annual Post Competition Accountability Report More Documents & Publications First Annual Post Competition Accountability Report Third Annual Post Competition Accountability Report Post Competition Accountability

  2. First Annual Post Competition Accountability Report | Department of Energy

    Energy Savers [EERE]

    First Annual Post Competition Accountability Report First Annual Post Competition Accountability Report LM has completed its first annual Post Competition Accountability Report - Office of Legacy Management's High Performing Organization: Fiscal Year (FY) 2012 PDF icon First Annual Post Competition Accountability Report More Documents & Publications Second Annual Post Competition Accountability Report Third Annual Post Competition Accountability Report Post Competition Accountability Report:

  3. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    300M Estimated Period of Performance: 5 Years Estimated RFP/RFQ Release Date: 2 nd QTR 2018 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: pia@lanl.gov Title: Staff Augmentation Services Description of Product or Service Required Staff Augmentation Services (Current subcontract expires 2019) * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note

  4. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: Itmartinez@lanl.gov Title: QA Support Description of Product or Service Required QA Support (Current subcontracts expires 2018) * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note the competition type on the forecast matrix to determine if a procurement has been set aside or is open to fair and

  5. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    700K Estimated Period of Performance: TBD Estimated RFP/RFQ Release Date: FY 2018 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: m_armijo@lanl.gov Title: Poly Com Phones Description of Product or Service Required Poly Com Phones (Current subcontracts expires 2019) * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note the competition type on the

  6. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: m_armijo@lanl.gov Title: Crowdsourcing Description of Product or Service Required Crowdsourcing * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note the competition type on the forecast matrix to determine if a procurement has been set aside or is open to fair and reasonable competition. * LANL

  7. Posting Date: 28 May, 2015 Posting Close Date: TBD

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    238210 Estimated Subcontract/PO Value: TBD Estimated Period of Performance: TBD Estimated RFP/RFQ Release Date: FY 2016 Estimated Award Date: TBD Competition Type: TBD Buyer Contact Email: brianhornung@lanl.gov Title: Fire Alarm Project Support Description of Product or Service Required Fire Alarm Project Support * Current forecasted bid opportunities are subject to change or cancellation due to scope, mission, or funding requirements. * Some procurements are reserved for small businesses. Note

  8. T-526: Microsoft Internet Explorer 'ReleaseInterface()' Remote Code Execution Vulnerability

    Broader source: Energy.gov [DOE]

    Microsoft Internet Explorer is prone to a remote code-execution vulnerability. Successful exploits will allow an attacker to run arbitrary code in the context of the user running the application. Failed attacks will cause denial-of-service conditions. Microsoft Internet Explorer 8.0.7600.16385 is vulnerable; other versions may also be affected.

  9. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  10. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  11. Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002

    SciTech Connect (OSTI)

    R. B. Jackson

    2003-08-01

    This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

  12. Requirements for Wind Development

    Broader source: Energy.gov [DOE]

    In 2015 Oklahoma amended the Oklahoma Wind Energy Development Act. The amendments added new financial security requirements, setback requirements, and notification requirements for wind energy...

  13. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  14. Network Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous...

  15. Audio Requirements for the Web | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Videos, Animations, & Audio » Audio Requirements for the Web Audio Requirements for the Web Audio-only files-whether they are downloaded from a page or distributed via a podcast-must be accessible to all visitors of the Office of Energy Efficiency and Renewable Energy (EERE) website. For developing and posting audio-only files, follow these requirements and best practices. Use the multimedia quality assurance checklists to ensure your audio file meets all of EERE's requirements. Technical

  16. First round of NISE awards posted

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First round of NISE awards posted First round of NISE awards posted April 13, 2011 by Francesca Verdier The first round of NERSC Initiative for Scientific Exploration (NISE) awards have been posted. 36 projects were awarded 34.77 million hours. See: 2011 NISE Awards. Subscribe via RSS Subscribe Browse by Date January 2016 December 2015 November 2015 October 2015 September 2015 August 2015 July 2015 April 2015 March 2015 January 2015 December 2014 November 2014 October 2014 August 2014 June 2014

  17. ARM - Spring 2002 Post-Workshop Evaluations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post-Workshop Evaluations Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox Lesson Plans Spring 2002 Post-Workshop Evaluations This is the analysis of the post-workshop evaluations that were given to teachers in Manus after the ARM Climate Change Teacher Workshops held in spring of 2002. The Manus Workshop

  18. NOVEMBER 2015 POSTINGS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOVEMBER 2015 POSTINGS NOVEMBER 2015 POSTINGS PDF icon November 24, 2015: Taking the Lighting Revolution to a New Level PDF icon November 17, 2015: Increasing LED Efficacy: What We Stand to Gain PDF icon November 10, 2015: Lessons in Exterior Lighting at Princeton University PDF icon November 4, 2015: SSL in America-Spotlight on LumiGrow More Documents & Publications Exterior LED Lighting Projects at Princeton University 2015 Project Portfolio April 2015 Postings

  19. Post-Closure Benefits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Closure Benefits Post-Closure Benefits The Legacy Management Post-Closure Benefits (PCB) Program includes the development, implementation, and oversight of the Department's policy concerning the continuation of contractor pension and medical benefits after the closure of applicable DOE sites/facilities. This includes oversight of the administration and management of legacy contractor benefits in a fiscally responsible and effective manner. The primary program objective is to ensure a

  20. 2013 SSL Market Introduction Workshop Presentations Posted

    Broader source: Energy.gov [DOE]

    DOE has posted the presentations and materials from the eighth annual Solid-State Lighting Market Introduction Workshop, held November 12-14 in Portland, OR.

  1. POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING

    Office of Environmental Management (EM)

    POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support

  2. Associate Research Physicist (Post Doc, Experimental Research...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post Doc, Experimental Research, NSTX-U, Radio Frequency Waves) Department: Research Staff: RM1 Requisition Number: 1500421 The Princeton Plasma Physics Laboratory (PPPL) seeks to...

  3. Third Annual Post Competition Accountability Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Annual Post Competition Accountability Report Third Annual Post Competition Accountability Report LM has completed its third annual Post Competition Accountability Report - Office of Legacy Management's High Performing Organization: Fiscal Year (FY) 2014 PDF icon Third Annual Post Competition Accountability Report More Documents & Publications First Annual Post Competition Accountability Report Second Annual Post Competition Accountability Report Contractor Fee Payments - Savannah

  4. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  5. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  6. Science Requirements Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  7. When the Internet Runs Out of Addresses, It'll be IPv6 to the Rescue! |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Wendy Wolfson Tsabba Communications Specialist, Lawrence Berkeley National Laboratory What does this mean for me? There are "only" 3.2 billion unique addresses available across the Internet and we are quickly approaching that limit. Network engineers have been working on a new protocol called IPv6 to solve the problem. Happy World IPv6 Day! What is IPv6 you might ask? Well, IP is the Internet Protocol. It's the way all devices on the Internet from smartphones

  8. OPS 9.17 Operator Aid Postings 8/24/98 | Department of Energy

    Energy Savers [EERE]

    7 Operator Aid Postings 8/24/98 OPS 9.17 Operator Aid Postings 8/24/98 The objective of this surveillance is to verify that the most current revisions of operator aids are posted for facility personnel. These surveillance activities provide a basis for evaluating the effectiveness of the contractor's program for control of and revision to operator aids and for establishing compliance with DOE requirements. Microsoft Office document icon OPS9-17.doc More Documents & Publications OPS 9.4

  9. The Portal Post Newsletter - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sign Up for The Portal Post Email Newsletter Enter your email address to get the latest updates on the Energy Innovation Portal including: New features and content Upcoming events Featured EERE technologies Featured research partners and licensing professionals Enter your email address: Enter Email Submit For past issues of The Portal Post, see the menu on the left hand side of this page

  10. POST-CLOSURE CARE AND INSPECTION PLAN

    Office of Legacy Management (LM)

    B Post-Closure Care and Inspection Plan This page intentionally left blank U.S. Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. No. S03496-8.0-Final Attachment B-Post-Closure Care and Inspection Plan January 2015 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction

  11. Post-Retrofit Residential Assessments

    SciTech Connect (OSTI)

    Lancaster, Ross; lutzenhiser, Loren; Moezzi, Mithra; Widder, Sarah H.; Chandra, Subrato; Baechler, Michael C.

    2012-04-30

    This study examined a range of factors influencing energy consumption in households that had participated in residential energy-efficiency upgrades. The study was funded by a grant from the U.S. Department of Energys Pacific Northwest National Laboratory and was conducted by faculty and staff of Portland State University Center for Urban Studies and Department of Economics. This work was made possible through the assistance and support of the Energy Trust of Oregon (ETO), whose residential energy-efficiency programs provided the population from which the sample cases were drawn. All households in the study had participated in the ETO Home Performance with Energy Star (HPwES) program. A number of these had concurrently pursued measures through other ETO programs. Post-retrofit energy outcomes are rarely investigated on a house-by-house basis. Rather, aggregate changes are ordinarily the focus of program impact evaluations, with deviation from aggregate expectations chalked up to measurement error, the vagaries of weather and idiosyncrasies of occupants. However, understanding how homes perform post-retrofit on an individual basis can give important insights to increase energy savings at the participant and the programmatic level. Taking a more disaggregated approach, this study analyzed energy consumption data from before and after the retrofit activity and made comparisons with engineering estimates for the upgrades, to identify households that performed differently from what may have been expected based on the estimates. A statistical analysis using hierarchal linear models, which accounted for weather variations, was performed looking separately at gas and electrical use during the periods before and after upgrades took place. A more straightforward comparison of billing data for 12-month periods before and after the intervention was also performed, yielding the majority of the cases examined. The later approach allowed total energy use and costs to be assessed but did not account for weather variation. From this statistical analysis, 18 study participants were selected and interviewed. The participants completed an in-home interview covering a range of topics, including changes in occupancy and additional changes to the homes that may have affected energy use. The goal of the interviews was to identify factors that may have contributed to unusual energy performance. These factors were identified by their frequency of occurrence in outperforming or underperforming homes, or simply by identifying factors that had the largest impact on overall savings. The motivations and levels of satisfaction with the outcomes of the upgrades were covered in detail, as well as extensive discussions of behaviors pertaining to thermal control, lighting, water, and appliance use. Most of cases studied achieved substantial energy savings, although it was more common for the projected savings to be greater than the demonstrated savings. Two factors that played a very large role in savings variation were 1) changes in occupancy and 2) fenestration improvements outside of the incentive programs. Motivation for pursuing the upgrades (e.g., environmental sustainability vs. comfort or cost savings) did not seem to play any role in achieving savings. Participants generally were more concerned with maintaining aesthetics through lighting than comfort through heating or cooling. They also seemed more likely to turn the lights off when leaving a room than to turn the heat off when leaving the home.

  12. Optimization of Post Combustion in Steelmaking (TRP 9925)

    SciTech Connect (OSTI)

    Dr. Richard J. Fruehan; Dr. R. J. Matway

    2004-03-31

    In the electric arc furnace (EAF), and the basic oxygen furnace (BOF) for producing steel, the major off gas is carbon monoxide (CO). If the CO can be combusted to CO{sub 2}, and the energy transferred to the metal, this reaction will reduce the energy consumed in the EAF and allow for more scrap melting in the BOF which would significantly lower the energy required to produce steel. This reaction is referred to as post combustion. In order to optimize the post combustion process, computational fluid dynamic models (CFD) of the two steelmaking processes were developed. Before the models could be fully developed information on reactions affecting post combustion had to be obtained. The role of the reaction of CO{sub 2} with scrap (iron) was measured at the temperatures relevant to post combustion in laboratory experiments. The experiments were done to separate the effects of gas phase mass transfer, chemical kinetics, and solid state mass transfer through the iron oxide formed by the reaction. The first CFD model was for the EAF using the FIDAP-CFD{trademark} code. Whereas this model gave some useful results it was incomplete due to problems with the FIDAP program. In the second EAF model, the CFX{trademark} code was used and was much more successful. The full 3-D model included all forms of heat transfer and the back reactions of CO{sub 2} with the metal and scrap. The model for the EAF was a full 3-D model and consisted of a primary oxygen lance with side wall injectors for post combustion. The model could predict the degree of post combustion and heat transfer. The BOF model was a slice of the BOF for which there was symmetry. The model could predict post combustion, heat transfer, temperature profiles and the effect of operating variables such as oxygen flow rates and distribution. The present research developed several new models such as limited combustion and depostcombustion. These were all documented by MSA Pass as a sub-contract. Instruction manuals were developed so the models could be used by industry. The work indicates considerable energy can be generated and usefully used in the BOF and EAF. The processes can be optimized for specific cases using the models developed.

  13. Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Requirements Review Reports Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1

  14. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Act (CAA) Requirements for air quality and air emissions from facility operations Clean Water Act (CWA) Requirements for water quality and water discharges from facility...

  15. ORISE: How to Find Reliable HIV/AIDS Treatment on the Internet

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Find Reliable HIV/AIDS Treatment Information on the Internet August 2011 This document was prepared for the National Library of Medicine by the Oak Ridge Institute for Science and Education through an interagency agreement with the U.S. Department of Energy. ORISE is managed by Oak Ridge Associated Universities under DOE contract number DE-AC06OR23100. Evaluating Health Information on the Internet The World Wide Web contains an abundance of free health information, available 24 hours per day.

  16. The Internet Café of the Nuclear World | Department of Energy

    Energy Savers [EERE]

    The Internet Café of the Nuclear World The Internet Café of the Nuclear World July 19, 2012 - 12:25pm Addthis Participants in the 2012 Advanced Test Reactor National Scientific User Facility Users Week, held at Idaho National Laboratory in June. | Photo courtesy of the Idaho National Laboratory Participants in the 2012 Advanced Test Reactor National Scientific User Facility Users Week, held at Idaho National Laboratory in June. | Photo courtesy of the Idaho National Laboratory Karissa Marcum

  17. GEO-ENGINEERING MODELING THROUGH INTERNET INFORMATICS (GEMINI)

    SciTech Connect (OSTI)

    W. Lynn Watney; John H. Doveton

    2004-05-13

    GEMINI (Geo-Engineering Modeling through Internet Informatics) is a public-domain web application focused on analysis and modeling of petroleum reservoirs and plays (http://www.kgs.ukans.edu/Gemini/index.html). GEMINI creates a virtual project by ''on-the-fly'' assembly and analysis of on-line data either from the Kansas Geological Survey or uploaded from the user. GEMINI's suite of geological and engineering web applications for reservoir analysis include: (1) petrofacies-based core and log modeling using an interactive relational rock catalog and log analysis modules; (2) a well profile module; (3) interactive cross sections to display ''marked'' wireline logs; (4) deterministic gridding and mapping of petrophysical data; (5) calculation and mapping of layer volumetrics; (6) material balance calculations; (7) PVT calculator; (8) DST analyst, (9) automated hydrocarbon association navigator (KHAN) for database mining, and (10) tutorial and help functions. The Kansas Hydrocarbon Association Navigator (KHAN) utilizes petrophysical databases to estimate hydrocarbon pay or other constituent at a play- or field-scale. Databases analyzed and displayed include digital logs, core analysis and photos, DST, and production data. GEMINI accommodates distant collaborations using secure password protection and authorized access. Assembled data, analyses, charts, and maps can readily be moved to other applications. GEMINI's target audience includes small independents and consultants seeking to find, quantitatively characterize, and develop subtle and bypassed pays by leveraging the growing base of digital data resources. Participating companies involved in the testing and evaluation of GEMINI included Anadarko, BP, Conoco-Phillips, Lario, Mull, Murfin, and Pioneer Resources.

  18. Post combustion trials at Dofasco's KOBM furnace

    SciTech Connect (OSTI)

    Farrand, B.L.; Wood, J.E.; Goetz, F.J.

    1992-01-01

    Post combustion trials were conducted at Dofasco's 300 tonne KOBM furnace as part of the AISI Direct Steelmaking Program. The purpose of the project work was to measure the post combustion ratio (PCR) and heat transfer efficiency (HTE) of the post combustion reaction in a full size steelmaking vessel. A method of calculating PCR and HTE using off gas analysis and gas temperature was developed. The PCR and HTE were determined under normal operating conditions. Trials assessed the effect of lance height, vessel volume, foaming slag and pellet additions on PCR and HTE.

  19. April 2015 Postings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2015 Postings April 2015 Postings PDF icon Apr. 28, 2015: See You at LIGHTFAIR PDF icon Apr. 22, 2015: A Treasure Trove of SSL Market Data PDF icon Apr. 15, 2015: SSL in America-Spotlight on SAES Pure Gas PDF icon Apr. 10, 2015: Save These Dates PDF icon Apr. 2, 2015: SSL in America-Spotlight on PhosphorTech More Documents & Publications Manufacturing R&D Initiative Lowers Costs and Boosts Quality JULY 2015 POSTINGS 2015 Project Portfolio

  20. Postings Archives-2009 | Department of Energy

    Energy Savers [EERE]

    09 Postings Archives-2009 SSL IN AMERICA, A growing number of companies are working hard to create and strengthen an SSL manufacturing base here in the U.S. Read their stories This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, as well as timely discussions of critical issues impacting the development and acceptance of solid-state lighting. If you wish to

  1. Postings Archives-2010 | Department of Energy

    Energy Savers [EERE]

    0 Postings Archives-2010 SSL IN AMERICA, A growing number of companies are working hard to create and strengthen an SSL manufacturing base here in the U.S. Read their stories This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, as well as timely discussions of critical issues impacting the development and acceptance of solid-state lighting. If you wish to

  2. Postings Archives-2011 | Department of Energy

    Energy Savers [EERE]

    1 Postings Archives-2011 SSL IN AMERICA, A growing number of companies are working hard to create and strengthen an SSL manufacturing base here in the U.S. Read their stories This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, as well as timely discussions of critical issues impacting the development and acceptance of solid-state lighting. If you wish to

  3. Postings Archives-2012 | Department of Energy

    Energy Savers [EERE]

    2 Postings Archives-2012 SSL IN AMERICA, A growing number of companies are working hard to create and strengthen an SSL manufacturing base here in the U.S. Read their stories This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, as well as timely discussions of critical issues impacting the development and acceptance of solid-state lighting. If you wish to

  4. Postings Archives-2013 | Department of Energy

    Energy Savers [EERE]

    3 Postings Archives-2013 SSL IN AMERICA, A growing number of companies are working hard to create and strengthen an SSL manufacturing base here in the U.S. Read their stories This page contains links to weekly Postings from the U.S. Department of Energy (DOE) Solid-State Lighting Program. The Postings provide updates from DOE on solid-state lighting program events, as well as timely discussions of critical issues impacting the development and acceptance of solid-state lighting. If you wish to

  5. Microsoft Word - Attachment B - Reporting Requirements.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-SOL-0003339 J.1 ATTACHMENT B - REPORTING REQUIREMENTS REPORTING REQUIREMENTS CHECKLIST 1. AWARDEE: 2. IDENTIFICATION NUMBER: REPORT SUBMISSION: Reports shall be submitted to the electronic addresses indicated in the NETL-identified distribution list provided in the post award debriefing. Electronic copies of each report must be submitted to the Contract Specialist (CS) and Contracting Officer's Representative (COR). 4. PLANNING AND REPORTING REQUIREMENTS FORM NO. FREQ. NO. OF COPIES FORM NO.

  6. FEBRUARY 2016 POSTINGS | Department of Energy

    Energy Savers [EERE]

    FEBRUARY 2016 POSTINGS FEBRUARY 2016 POSTINGS PDF icon February 24, 2016: A New Report on Flicker-Meter Performance PDF icon February 17, 2016: Another Look at LED MR16s PDF icon February 11, 2016: Some Thoughts on Last Week's Workshop PDF icon February 2, 2016: Greetings from Raleigh More Documents & Publications Snapshot: MR16 Lamps LED MR16 Lamps Characterizing Photometric Flicker

  7. August 2015 POSTINGS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2015 POSTINGS August 2015 POSTINGS PDF icon August 26, 2015: SSL in America-Spotlight on Luminit PDF icon August 19, 2015: A New Method for Evaluating Color Rendition PDF icon August 11, 2015: Strong Evidence of SSL's Potential PDF icon August 5, 2015: When Other Concerns Outweigh Energy Efficiency More Documents & Publications GATEWAY Univ of Maryland Report SSL Adoption by Museums: Survey Results, Analysis, and Recommendations Lighting Designer Roundtable on Solid-State Lighting

  8. NERSC Seeks New Director - Job Position Posted

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Seeks New Director - Job Position Posted NERSC Seeks New Director - Job Position Posted February 19, 2012 by Francesca Verdier Current NERSC Director Kathy Yelick was named Associate Lab Director for Computing Sciences at Berkeley Lab in September 2010. In order to focus more on strategic planning at the lab, she has opened a search for a new NERSC Division Director. This position provides vision and strategic leadership to establish and maintain the leading-edge computing capability available

  9. OCTOBER 2015 POSTINGS | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    October 28, 2015: Lighting the Motor City's Streets PDF icon October 20, 2015: A Solid-State Lighting Workshop That's Not to Be Missed PDF icon October 13, 2015: A Groundbreaking Meeting on Connected Lighting Systems PDF icon October 6, 2015: Chronicle of a City's LED Street Lighting Conversion More Documents & Publications Portland Street Lighting Report (August 2015) November 2014 Postings NOVEMBER 2015 POSTINGS

  10. Post Competition Accountability Report: First Quarter, FY2013 | Department

    Energy Savers [EERE]

    of Energy Post Competition Accountability Report: First Quarter, FY2013 Post Competition Accountability Report: First Quarter, FY2013 Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012 Fiscal Years (FY) 2012 - 2016: Reporting Period: First Quarter, FY2013 PDF icon Post Competition Accountability Report: First Quarter, FY2013 More Documents & Publications Post Competition Accountability Report: Second Quarter, FY 2013 Post Competition

  11. Requirements Management Database

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This application is a simplified and customized version of the RBA and CTS databases to capture federal, site, and facility requirements, link to actions that must be performed to maintain compliance with their contractual and other requirements.

  12. Posting Date: 12/18/15 Posting Close Date: 1/4/16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    815 Posting Close Date: 1416 North American Industry Classification System (NAICS) code for the request: 336211 Estimated SubcontractPO Value: TBD Estimated Period of...

  13. Conditions and Requirements

    Broader source: Energy.gov [DOE]

    Conditions and requirements for Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are spelled out below:

  14. ARM - Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    StatisticsReporting Requirements 2016 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) Past Quarterly Reports Historical Statistics Field Campaigns Operational Visitors and Accounts Data Archive and Usage (October 1995 - Present) Reporting Requirements As a matter of government policy, all U.S. Department of Energy user facilities, including the ARM Climate Research Facility, have a number of reporting requirements. The Facility is required to

  15. Post-Review Feedback Questionnaire for Evaluating the Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Review Feedback Questionnaire for Evaluating the Peer Review Process Post-Review Feedback Questionnaire for Evaluating the Peer Review Process EERE is committed to continuous ...

  16. Sandia Energy - Post-Processing and Analysis of Wake Measurements...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post-Processing and Analysis of Wake Measurements Around a Scaled Turbine Home Renewable Energy Energy Water Power Partnership News News & Events Post-Processing and Analysis of...

  17. Energy Advising Services in the Post-ARRA World | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Advising Services in the Post-ARRA World Energy Advising Services in the Post-ARRA World Better Buildings Residential Network Workforce Business Partners Peer Exchange ...

  18. Post-2012 Climate Instruments in the transport sector | Open...

    Open Energy Info (EERE)

    mitigation instruments under a post-2012 Climate Change Agreement. It analysis of how international funding mechanisms, particularly NAMAs, under the post-2012 climate...

  19. Methods for Post Irradiation Examination of Tritium Producing...

    Office of Environmental Management (EM)

    Methods for Post Irradiation Examination of Tritium Producing Burnable Absorber Rods Methods for Post Irradiation Examination of Tritium Producing Burnable Absorber Rods...

  20. Post-Polymerization Crosslinked Polyurethane Shape-Memory Polymers...

    Office of Scientific and Technical Information (OSTI)

    Post-Polymerization Crosslinked Polyurethane Shape-Memory Polymers Citation Details In-Document Search Title: Post-Polymerization Crosslinked Polyurethane Shape-Memory Polymers ...

  1. Post Irradiation Examination of Stainless Steel Cladding from...

    Office of Environmental Management (EM)

    Post Irradiation Examination of Stainless Steel Cladding from In-Reactor Permeation Experiment Post Irradiation Examination of Stainless Steel Cladding from In-Reactor Permeation...

  2. DOE Announces Acquisition Strategy for Post Fiscal Year 2016...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos...

  3. V-058: Microsoft Internet Explorer CDwnBindInfo Object Reuse Flaw Lets Remote Users Execute Arbitrary Code

    Broader source: Energy.gov [DOE]

    A vulnerability was reported in Microsoft Internet Explorer. A remote user can cause arbitrary code to be executed on the target user's system.

  4. Requirement-Reviews.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  5. Inventing an Energy Internet: Concepts, Architectures and Protocols for Smart Energy Utilization

    ScienceCinema (OSTI)

    Tsoukalas, Lefteri [Purdue University, Purdue, Indiana, United States

    2010-01-08

    In recent years, the Internet is revolutionizing information availability much like the Power Grid revolutionized energy availability a century earlier. We will explore the differences and similarities of these two critical infrastructures and identify ways for convergence which may lead to an energy internet. Pricing signals, nodal forecasting, and short-term elasticities are key concepts in smart energy flows respecting the delicate equilibrium involved in generation-demand and aiming at higher efficiencies. We will discuss how intelligent forecasting approaches operating at multiple levels (including device or nodal levels) can ameliorate the challenges of power storage. In addition to higher efficiencies, an energy internet may achieve significant reliability and security improvements and offer greater flexibility and transparency in the overall energy-environmental relation.

  6. Inventing an Energy Internet: Concepts, Architectures, and Protocols for Smart Energy Utilization

    SciTech Connect (OSTI)

    Tsoukalas, Lefteri

    2009-04-29

    In recent years, the Internet is revolutionizing information availability much like the Power Grid revolutionized energy availability a century earlier. We will explore the differences and similarities of these two critical infrastructures and identify ways for convergence which may lead to an energy internet. Pricing signals, nodal forecasting, and short-term elasticities are key concepts in smart energy flows respecting the delicate equilibrium involved in generation-demand and aiming at higher efficiencies. We will discuss how intelligent forecasting approaches operating at multiple levels (including device or nodal levels) can ameliorate the challenges of power storage. In addition to higher efficiencies, an energy internet may achieve significant reliability and security improvements and offer greater flexibility and transparency in the overall energy-environmental relation.

  7. Inventing an Energy Internet: Concepts, Architectures and Protocols for Smart Energy Utilization

    SciTech Connect (OSTI)

    Tsoukalas, Lefteri

    2009-04-29

    In recent years, the Internet is revolutionizing information availability much like the Power Grid revolutionized energy availability a century earlier. We will explore the differences and similarities of these two critical infrastructures and identify ways for convergence which may lead to an energy internet. Pricing signals, nodal forecasting, and short-term elasticities are key concepts in smart energy flows respecting the delicate equilibrium involved in generation-demand and aiming at higher efficiencies. We will discuss how intelligent forecasting approaches operating at multiple levels (including device or nodal levels) can ameliorate the challenges of power storage. In addition to higher efficiencies, an energy internet may achieve significant reliability and security improvements and offer greater flexibility and transparency in the overall energy-environmental relation.

  8. March 2015 Postings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2015 Postings March 2015 Postings PDF icon Mar. 25, 2015: Recognizing the Eminently Specifiable in a Fast-Moving Market PDF icon Mar. 16, 2015: LED Lamps Sold at Retail Stores PDF icon Mar. 10, 2015: Still Much Work to Be Done PDF icon Mar. 3, 2015: SSL in America-Spotlight on Sky Factory More Documents & Publications Caliper Retail Lamps Study 3.1: Dimming, Flicker, and Power Quality Characteristics of LED A Lamps DOE Booth Presentations From Grainger Show 2015 Downloads Emerging

  9. Generator stator core vent duct spacer posts

    DOE Patents [OSTI]

    Griffith, John Wesley (Schenectady, NY); Tong, Wei (Clifton Park, NY)

    2003-06-24

    Generator stator cores are constructed by stacking many layers of magnetic laminations. Ventilation ducts may be inserted between these layers by inserting spacers into the core stack. The ventilation ducts allow for the passage of cooling gas through the core during operation. The spacers or spacer posts are positioned between groups of the magnetic laminations to define the ventilation ducts. The spacer posts are secured with longitudinal axes thereof substantially parallel to the core axis. With this structure, core tightness can be assured while maximizing ventilation duct cross section for gas flow and minimizing magnetic loss in the spacers.

  10. February 2015 Postings | Department of Energy

    Energy Savers [EERE]

    February 2015 Postings February 2015 Postings PDF icon Feb. 24, 2015: SSL Is Stepping Up to the Plate in the Sports World PDF icon Feb. 18, 2015: A Candid Look at LED PAR38 Lamps PDF icon Feb. 10, 2015: LED Adoption by Museums: Survey Results and Recommendations PDF icon Feb. 5, 2015: Some Thoughts on the San Francisco Workshop More Documents & Publications SSL Adoption by Museums: Survey Results, Analysis, and Recommendations Report 20.5: Chromaticity Shift Modes of LED PAR38 Lamps Operated

  11. Ars Technica: Analyzing the Internet of Things in San Ramon | GE Global

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Analyzing the Internet of Things Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) Ars Technica: Analyzing the Internet of Things As a continuation of its Chasing Brilliance series, Ars Technica sent a reporter to GE Global Research in San Ramon to learn about research going on at the software hub. Read more

  12. BER Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Science Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is

  13. BES Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  14. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  15. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  16. Residential Solar Permit Requirements

    Broader source: Energy.gov [DOE]

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  17. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  18. HPC Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews: Target 2017 Requirements Reviews: Target 2014 Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Accelerator Science Astrophysics & Cosmology...

  19. Transuranic Waste Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  20. Post Secondary Project Performance Benchmarks | Department of Energy

    Energy Savers [EERE]

    Post Secondary Project Performance Benchmarks Post Secondary Project Performance Benchmarks Reports five major performance metrics that can be used to benchmark proposed energy service company projects within post secondary education facilities, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy PDF icon Post Secondary Project Performance Benchmarks More Documents & Publications K-12 Schools

  1. Next Generation * Natural Gas (NG)2 Information Requirements--Executive Summary

    Reports and Publications (EIA)

    2000-01-01

    The Energy Information Administration (EIA) has initiated the Next Generation * Natural Gas (NG)2 project to design and implement a new and comprehensive information program for natural gas to meet customer requirements in the post-2000 time frame.

  2. A Rich Resource Requires Recovery | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report / A Rich Resource Requires ... A Rich Resource Requires Recovery Posted: July 22, 2013 - 3:33pm | Y-12 Report | Volume 10, Issue 1 | 2013 Recovering uranium from manufacturing processes and from disassembled and dismantled weapons helps ensure an effective stockpile and is a key element of Y-12's weapons work. "We must optimize the use of this extremely valuable material since the quantity is limited," said Brian Gullett of Stockpile Programs. For Y-12, reusing manufacturing

  3. 2015's Top Five Blog Posts

    Broader source: Energy.gov [DOE]

    Here on the EERE Blog, we tell other stories related to the Energy Department’s efforts to develop and deliver market solutions for energy saving-homes, buildings, and manufacturing; sustainable transportation; and renewable electricity generation. Here are our top five blog posts for 2015.

  4. General Responsibilities and Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  5. Internet-Based Survey Evaluating Use of Pain Medications and Attitudes of Radiation Oncology Patients Toward Pain Intervention

    SciTech Connect (OSTI)

    Simone, Charles B. Vapiwala, Neha; Hampshire, Margaret K.; Metz, James M.

    2008-09-01

    Purpose: Pain is a common symptom among cancer patients, yet many patients do not receive adequate pain management. Few data exist quantifying analgesic use by radiation oncology patients. This study evaluated the causes of pain in cancer patients and investigated the reasons patients fail to receive optimal analgesic therapy. Methods and Materials: An institutional review board-approved, Internet-based questionnaire assessing analgesic use and pain control was posted on the OncoLink (available at (www.oncolink.org)) Website. Between November 2005 and April 2006, 243 patients responded. They were predominantly women (73%), white (71%), and educated beyond high school (67%) and had breast (38%), lung (6%), or ovarian (6%) cancer. This analysis evaluated the 106 patients (44%) who underwent radiotherapy. Results: Of the 106 patients, 58% reported pain from their cancer treatment, and 46% reported pain directly from their cancer. The pain was chronic in 51% and intermittent in 33%. Most (80%) did not use medication to manage their pain. Analgesic use was significantly less in patients with greater education levels (11% vs. 36%, p = 0.002), with a trend toward lower use by whites (16% vs. 32%, p 0.082) and women (17% vs. 29%, p = 0.178). The reasons for not taking analgesics included healthcare provider not recommending medication (87%), fear of addiction or dependence (79%), and inability to pay (79%). Participants experiencing pain, but not taking analgesics, pursued alternative therapies for relief. Conclusions: Many radiation oncology patients experience pain from their disease and cancer treatment. Most study participants did not use analgesics because of concerns of addiction, cost, or failure of the radiation oncologist to recommend medication. Healthcare providers should have open discussions with their patients regarding pain symptoms and treatment.

  6. Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Requirements Statutes 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air Act, Section 309 CEQ Regulations 40 CFR Part 1500-1508: CEQ - Regulations for Implementing NEPA DOE Regulations and Orders 10 CFR Part 1021: NEPA Implementing Procedures 10 CFR Part 1021: NEPA Rulemaking Process 10 CFR Part 1022: Compliance with Floodplain and Wetland Environmental Review Requirements DOE O 451.1B:

  7. Selected Guidance & Requirements

    Broader source: Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  8. Promulgating Nuclear Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-05-15

    Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

  9. Green Building Requirement

    Broader source: Energy.gov [DOE]

    The new standards are phased in over the course of several years with publicly-owned buildings being the first required to comply. All new construction and substantial improvements of non...

  10. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental

  11. FBI officer accepts LANL counterintelligence post

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL counterintelligence FBI officer accepts LANL counterintelligence post Cloyd has most recently served as assistant director of the Counterintelligence Division of the Federal Bureau of Investigation headquarters. November 10, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

  12. From The Washington Post's Federal Diary:

    National Nuclear Security Administration (NNSA)

    The Washington Post's Federal Diary: Merit Pay in a Nuclear Test Project By Stephen Barr Friday, March 28, 2008; D04 The agency that maintains the nation's nuclear weapons stockpile is undertaking a five-year project to overhaul pay practices so it will be more competitive in hiring scientists, engineers and other professionals. Under the pilot project, the National Nuclear Security Administration will leave the government-wide pay system -- the 15-grade General Schedule -- and replace it with

  13. Ultrafast carrier capture in InGaAs quantum posts

    SciTech Connect (OSTI)

    Talbayev, Diyar; Taylor, Antoinette J; Stehr, D; Morris, C M; Wagner, M; Kim, H C; Schneider, H; Petroff, P M; Sherwin, M S

    2009-01-01

    To explore the capture dynamics of photoexcited carriers in semiconductor quantum posts, optical pump - THz probe and time-resolved photoluminescence spectroscopy were performed. The results of the THz experiment show that after ultrafast excitation, electrons relax within a few picoseconds into the quantum posts, which are acting as efficient traps. The saturation of the quantum post states, probed by photoluminescence, was reached approximately at ten times the quantum post density in the samples. The results imply that quantum posts are posts highly attractive nanostructures for future device applications.

  14. AGR-1 Post Irradiation Examination Final Report

    SciTech Connect (OSTI)

    Demkowicz, Paul Andrew

    2015-08-01

    The post-irradiation examination (PIE) of the Advanced Gas Reactor (AGR)-1 experiment was a multi-year, collaborative effort between Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) to study the performance of UCO (uranium carbide, uranium oxide) tristructural isotropic (TRISO) coated particle fuel fabricated in the U.S. and irradiated at the Advanced Test Reactor at INL to a peak burnup of 19.6% fissions per initial metal atom. This work involved a broad array of experiments and analyses to evaluate the level of fission product retention by the fuel particles and compacts (both during irradiation and during post-irradiation heating tests to simulate reactor accident conditions), investigate the kernel and coating layer morphology evolution and the causes of coating failure, and explore the migration of fission products through the coating layers. The results have generally confirmed the excellent performance of the AGR-1 fuel, first indicated during the irradiation by the observation of zero TRISO coated particle failures out of 298,000 particles in the experiment. Overall release of fission products was determined by PIE to have been relatively low during the irradiation. A significant finding was the extremely low levels of cesium released through intact coatings. This was true both during the irradiation and during post-irradiation heating tests to temperatures as high as 1800C. Post-irradiation safety test fuel performance was generally excellent. Silver release from the particles and compacts during irradiation was often very high. Extensive microanalysis of fuel particles was performed after irradiation and after high-temperature safety testing. The results of particle microanalysis indicate that the UCO fuel is effective at controlling the oxygen partial pressure within the particle and limiting kernel migration. Post-irradiation examination has provided the final body of data that speaks to the quality of the AGR-1 fuel, building on the as-fabricated fuel characterization and irradiation data. In addition to the extensive volume of results generated, the work also resulted in a number of novel analysis techniques and lessons learned that are being applied to the examination of fuel from subsequent TRISO fuel irradiations. This report provides a summary of the results obtained as part of the AGR-1 PIE campaign over its approximately 5-year duration.

  15. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-05-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 426: Cactus Spring Waste Trenches (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 56, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation monitoring at the CAU 400 Five Points Landfill and CAU 407 should continue.

  16. Requirements | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Requirements Students must earn a total of 11 points from the following options: Please note: To receive points toward the certificate, student are required to submit...

  17. NP Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  18. Integrated Biorefinery Research Facility (IBRF I-II) (Post CD...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrated Biorefinery Research Facility (IBRF I-II) (Post CD-4), EERE, Aug 2011 Integrated Biorefinery Research Facility (IBRF I-II) (Post CD-4), EERE, Aug 2011 PDF icon 000521 & ...

  19. Requirements Definition Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

  20. Requirements for Xenon International

    SciTech Connect (OSTI)

    Hayes, James C.; Ely, James H.; Haas, Derek A.; Harper, Warren W.; Heimbigner, Tom R.; Hubbard, Charles W.; Humble, Paul H.; Madison, Jill C.; Morris, Scott J.; Panisko, Mark E.; Ripplinger, Mike D.; Stewart, Timothy L.

    2013-09-26

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  1. Data Crosscutting Requirements Review

    SciTech Connect (OSTI)

    Kleese van Dam, Kerstin; Shoshani, Arie; Plata, Charity

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  2. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    SciTech Connect (OSTI)

    Silvas, A. J.; Lantow, Tiffany A.

    2015-03-25

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

  3. Copy of Using Emulation and Simulation to Understand the Large-Scale Behavior of the Internet.

    SciTech Connect (OSTI)

    Adalsteinsson, Helgi; Armstrong, Robert C.; Chiang, Ken; Gentile, Ann C.; Lloyd, Levi; Minnich, Ronald G.; Vanderveen, Keith; Van Randwyk, Jamie A; Rudish, Don W.

    2008-10-01

    We report on the work done in the late-start LDRDUsing Emulation and Simulation toUnderstand the Large-Scale Behavior of the Internet. We describe the creation of a researchplatform that emulates many thousands of machines to be used for the study of large-scale inter-net behavior. We describe a proof-of-concept simple attack we performed in this environment.We describe the successful capture of a Storm bot and, from the study of the bot and furtherliterature search, establish large-scale aspects we seek to understand via emulation of Storm onour research platform in possible follow-on work. Finally, we discuss possible future work.3

  4. communications requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    communications requirements PDF icon communications requirements More Documents & Publications Re: NBP RFI: Communications Requirements- Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements NBP RFI: Communications Requirements- Comments of Lake Region Electric Cooperative- Minnesota

  5. DOE SSL Postings: July 23, 2015, issue

    Energy Savers [EERE]

    greatest possible energy savings from LED products will require ongoing technology R&D. Linear LEDs, for example, face tough competition from modern fluorescent lamp and ballast...

  6. DOE SSL Postings: September 23, 2015, issue

    Energy Savers [EERE]

    test points. The results show that future test procedures will likely require at least five to seven measurement points to provide a reasonable characterization. The increase in...

  7. Energy Efficiency Post-2011 Implementation Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    activities. The functions of regional programs and infrastructure are characterized by economies of scale, activities that require regional market influence, as well as...

  8. DOE SSL Postings, February 5, 2015 issue

    Energy Savers [EERE]

    to decreasing the amount of psychotherapy required in patients suffering from depression, to heightening the comfort and wellbeing of airline passengers. Dan Ryan of...

  9. Post Doctoral and Advanced Study Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post Doctoral and Advanced Study Program Relocation Travel Information Guide This information guide is provided by the CFO Travel Relocation Office to assist you in planning your relocation to Los Alamos. Please contact the Relocation Office at least two to four weeks prior to your relocation to discuss your relocation plans. You can contact the Relocation Office at (505) 665-4484 or by e-mail at relocation@lanl.gov. You must have met all contingencies, if any, of your hire as well as have

  10. "Dark Fiber" Enables Research to Create Tomorrow's Internet | U.S.

    Office of Science (SC) Website

    DOE Office of Science (SC) "Dark Fiber" Enables Research to Create Tomorrow's Internet Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) Community Resources Contact Information Advanced Scientific Computing Research U.S. Department of Energy SC-21/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-7486 F:

  11. Quantifying and Mapping the Digital Divide from an Internet Point of View

    SciTech Connect (OSTI)

    Cottrell, R.Les; Khan, Shahryar; Williams, Jerrod; Mehdi, Akbar; Kalim, Umar; Ali, Arshad; /NUST, Rawalpindi

    2008-09-18

    Quantitative knowledge of the magnitude, extent and trends of the Digital Divide are critical to understand and identify the regions most in need of help, to make rational decisions on how to address the problems and to make cases for executives, funding agencies and politicians. We report on a project (PingER) to measure the Digital Divide from the point of view of Internet performance. The PingER project has been measuring Internet performance since 1995 and with the increased emphasis on measuring and tracking the Digital Divide, it now covers over 700 hosts in over 150 countries that between them contain over 99% of the world's Internet connected population. In this paper we will describe the how PingER works, it deployment, the data analysis, and presentation. We also introduce a new PingER visualization tool (ViPER) that provides a more appealing interactive visualization of the PingER data and also works on mobile PDAs. We will also show results from PingER that illustrate the magnitude, extent and trends for the Digital Divide, and also compare PingER results with some human development and technology indices.

  12. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices  The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent receives benefits for a mastectomy and elects breast reconstruction in connection with the mastectomy. Benefits will not be restricted provided that the breast reconstruction is performed in a manner determined in consultation with you or your dependent's physician and may include:  all stages of reconstruction of the

  13. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  14. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  15. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  16. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  17. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  18. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  19. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the

  20. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  1. LASSO* - Science Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LASSO* - Science Requirements *LES ARM Symbiotic Simulation and Observation (LASSO) workflow Andy Vogelmann 1 , William I Gustafson Jr 2 Zhijin Li 3,4 , Xiaoping Cheng 3 , Satoshi Endo 1 , Tami Toto 1 , and Heng Xiao 2 1 Brookhaven National Laboratory 2 Pacific Northwest National Laboratory 3 University of California Los Angeles 4 NASA Jet Propulsion Laboratory And TONS of people from the rest of ARM! LASSO Webpage: http://www.arm.gov/science/themes/lasso LASSO e-mail list sign up:

  2. BES Science Network Requirements

    SciTech Connect (OSTI)

    Biocca, Alan; Carlson, Rich; Chen, Jackie; Cotter, Steve; Tierney, Brian; Dattoria, Vince; Davenport, Jim; Gaenko, Alexander; Kent, Paul; Lamm, Monica; Miller, Stephen; Mundy, Chris; Ndousse, Thomas; Pederson, Mark; Perazzo, Amedeo; Popescu, Razvan; Rouson, Damian; Sekine, Yukiko; Sumpter, Bobby; Dart, Eli; Wang, Cai-Zhuang -Z; Whitelam, Steve; Zurawski, Jason

    2011-02-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

  3. Post pulse shutter for laser amplifier

    DOE Patents [OSTI]

    Bradley, Laird P. [Livermore, CA; Carder, Bruce M. [Antioch, CA; Gagnon, William L. [Berkeley, CA

    1981-03-17

    Apparatus and method for quickly closing off the return path for an amplified laser pulse at the output of an amplifier so as to prevent damage to amplifiers and other optical components appearing earlier in the chain by the return of an amplified pulse. The apparatus consists of a fast retropulse or post pulse shutter to suppress target reflection and/or beam return. This is accomplished by either quickly placing a solid across the light transmitting aperture of a component in the chain, such as a spatial filter pinhole, or generating and directing a plasma with sufficiently high density across the aperture, so as to, in effect, close the aperture to the returning amplified energy pulse.

  4. Post pulse shutter for laser amplifier

    DOE Patents [OSTI]

    Bradley, L.P.; Carder, B.M.; Gagnon, W.L.

    1981-03-17

    Disclosed are an apparatus and method for quickly closing off the return path for an amplified laser pulse at the output of an amplifier so as to prevent damage to amplifiers and other optical components appearing earlier in the chain by the return of an amplified pulse. The apparatus consists of a fast retropulse or post pulse shutter to suppress target reflection and/or beam return. This is accomplished by either quickly placing a solid across the light transmitting aperture of a component in the chain, such as a spatial filter pinhole, or generating and directing a plasma with sufficiently high density across the aperture, so as to, in effect, close the aperture to the returning amplified energy pulse. 13 figs.

  5. CHP at Post Street in Downtown Seattle

    SciTech Connect (OSTI)

    Gent, Stan

    2012-04-12

    The Post Street project had four (4), 7.960 MW, Solar Taurus-70-10801S natural gas combustion turbines. Each turbine equipped with a 40,000 lb/hr heat recovery steam generator (HRSG). The dual-fuel HRSGs was capable of generating steam using gas turbine exhaust heat or surplus electric power. The generation capacity was nominally rated at 29.2 MW. The project as proposed had a fuel rate chargeable to power of 4,900 - 5,880 Btu/kWh dependent on time of year. The CHP plant, when operating at 29.2 MW, can recycle turbine exhaust into supply 145 kpph of steam to SSC per hour. The actual SSC steam loads will vary based on weather, building occupation, plus additions / reductions of customer load served. SSC produces up to 80 kpph of steam from a biomass boiler, which is currently base loaded all year.

  6. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  7. Competition Requirements | Department of Energy

    Office of Environmental Management (EM)

    PDF icon Competition Requirements More Documents & Publications Microsoft Word - AG Chapter 6 1 Nov 2010 AcqGuide 5.2-OPAM Chapter 6 - Competition Requirements

  8. The design and development of a single piece, sandwhich tube coldmass support post for the SSC Collider Dipole Magnets

    SciTech Connect (OSTI)

    Ahmad, A.; Mehle, G.

    1993-04-01

    This paper presents the design and development of the single piece, carbon/epoxy syntactic core sandwich tube support post concept for the 13-m and 15-m Collider Dipole Magnet (CDM). The engineering studies focus on balancing the structural and thermal requirements for the structure, and most importantly the implicit requirement of ``Designing for Producibility.`` Results from these studies, as well as the development program plan, will be presented.

  9. OSTIblog Posts by Stacy Kish | OSTI, US Dept of Energy, Office of

    Office of Scientific and Technical Information (OSTI)

    Scientific and Technical Information Stacy Kish Stacy Kish's picture Communications Specialist, U.S. DOE Office of Science Surfing the Internet Gets Deep Published on Jul 15, 2009 WorldWideScience provides a one-stop search engine to mine global scientific databases in the deep web The internet has revolutionized society by changing the way people communicate, find information, and enjoy entertainment. But a standard internet search misses at least 90 percent of the information available.

  10. ASCR Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Tierney, Brian

    2009-08-24

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

  11. Methods for Post Irradiation Examination of Tritium Producing Burnable

    Office of Environmental Management (EM)

    Absorber Rods | Department of Energy for Post Irradiation Examination of Tritium Producing Burnable Absorber Rods Methods for Post Irradiation Examination of Tritium Producing Burnable Absorber Rods Presentation from the 32nd Tritium Focus Group Meeting held in Germantown, Maryland on April 23-25, 2013. PDF icon Methods for Post Irradiation Examination of Tritium Producing Burnable Absorber Rods More Documents & Publications Design and Fabrication of In-Reactor Experiment to Measure

  12. 2013 NEJC Post-Conference Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 NEJC Post-Conference Summary 2013 NEJC Post-Conference Summary Another Successful Year for the 2013 National Environmental Justice Conference and Training Program PDF icon 2013 NEJC Post-Conference News Release More Documents & Publications Preparations Finalized for the 2013 National Environmental Justice Conference & Training Program PREPARATIONS UNDERWAY FOR THE 2014 NATIONAL ENVIRONMENTAL JUSTICE CONFERENCE & TRAINING PROGRAM 2013 National Environmental Justice Conference and

  13. DOE Announces More Key Administration Posts | Department of Energy

    Energy Savers [EERE]

    Key Administration Posts DOE Announces More Key Administration Posts March 20, 2009 - 12:00am Addthis WASHINGTON, DC - Today, President Barack Obama announced his intent to nominate the following individuals to key administration posts: Dr. Steven E. Koonin, Under Secretary for Science, Department of Energy; David Sandalow, Assistant Secretary for Policy and International Affairs, Department of Energy; Ambassador Johnnie Carson, Assistant Secretary for African Affairs, State Department; Kathy

  14. Petascale Post-Doc Project a Supercomputing Success Story

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Petascale Post-Doc Project a Supercomputing Success Story Petascale Post-Doc Project a Supercomputing Success Story ARRA-funded program takes petascale computing researchers to the next level March 24, 2014 Contact: Kathy Kincade, +1 510 495 2124, kkincade@lbl.gov petascalepostdocs.jpg From left: Jihan Kim, Filipe Maia, Alice Koniges, Robert Preissl, Brian Austin, Wangyi (Bobby) Liu , Kirsten Fagnan and Praveen Narayanan. The first post-doctoral research project centered at the Department of

  15. Post-Test Facility At Argonne | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Facility At Argonne Post-Test Facility At Argonne 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation PDF icon arravt077_es_bloom_2011_p.pdf More Documents & Publications Post-test Cell Characterization Facility Vehicle Technologies Office Merit Review 2014: Overview and Progress of Applied Battery Research (ABR) Activities Vehicle Technologies Office Merit Review 2015: Post-Test Analysis of Lithium-Ion Battery Materials at

  16. Post-test Cell Characterization Facility | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    test Cell Characterization Facility Post-test Cell Characterization Facility 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon es166_bloom_2012_o.pdf More Documents & Publications Vehicle Technologies Office Merit Review 2014: Post-Test Analysis of Lithium-Ion Battery Materials at Argonne National Laboratory Vehicle Technologies Office Merit Review 2015: Post-Test Analysis of Lithium-Ion Battery Materials at

  17. DOE Announces More Key Administration Posts | Department of Energy

    Office of Environmental Management (EM)

    More Key Administration Posts DOE Announces More Key Administration Posts March 27, 2009 - 12:00am Addthis WASHINGTON, DC - Today, President Barack Obama announced his intent to nominate the following individuals to key administration posts: Ray Mabus, Secretary of the Navy, Department of Defense; Donald Remy, General Counsel of the Army, Department of Defense; J. Randolph Babbitt, Administrator, Federal Aviation Administration; Jose D. Riojas, Assistant Secretary for Operations, Security and

  18. Post Irradiation Capabilities at the Idaho National Laboratory

    SciTech Connect (OSTI)

    Schulthess, J.L.

    2011-08-01

    The U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) oversees the research, development, and demonstration activities that ensure nuclear energy remains a viable energy option for the United States. Fuel and material development through fabrication, irradiation, and characterization play a significant role in accomplishing the research needed to support nuclear energy. All fuel and material development requires the understanding of irradiation effects on the fuel performance and relies on irradiation experiments ranging from tests aimed at targeted scientific questions to integral effects under representative and prototypic conditions. The DOE recently emphasized a solution-driven, goal-oriented, science-based approach to nuclear energy development. Nuclear power systems and materials were initially developed during the latter half of the 20th century and greatly facilitated by the United States ability and willingness to conduct large-scale experiments. Fifty-two research and test reactors with associated facilities for performing fabrication and pre and post irradiation examinations were constructed at what is now Idaho National Laboratory (INL), another 14 at Oak Ridge National Laboratory (ORNL), and a few more at other national laboratory sites. Building on the scientific advances of the last several decades, our understanding of fundamental nuclear science, improvements in computational platforms, and other tools now enable technological advancements with less reliance on large-scale experimentation.

  19. Enter the Post-Doc: The Untapped Sourcing Pipeline

    SciTech Connect (OSTI)

    Boscow, Ryan B.

    2011-07-30

    This article addresses the potential formulation and utilization of an industry-based Post-Doc program in order to create workforce candidate pipelines with targeted universities.

  20. Reviewing Post-Installation and Annual Reports for Federal ESPC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for implementing uniform and consistent reviews of post-installation and annual reports ... standardized reviews, and enable centralized tracking of ongoing project performance. ...

  1. Nuclear Safety Workshop Agenda - Post Fukushima Initiatives and...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy's (DOE) nuclear facilities and identify opportunities for improvement. Nuclear Safety Workshop Agenda - Post Fukushima Initiatives and Results More Documents &...

  2. Post Competition Accountability Report: Third Quarter, FY 2013

    Broader source: Energy.gov [DOE]

    Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012–2016: Reporting Period: Third Quarter, FY 2013

  3. Post Competition Accountability Report: Second Quarter, FY 2013

    Broader source: Energy.gov [DOE]

    Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012Fiscal Years (FY) 2012–2016: Reporting Period: Second Quarter, FY 2013

  4. Post Award Auditing of Cost Reimbursable Subcontracts Policy | The Ames

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Post Award Auditing of Cost Reimbursable Subcontracts Policy Version Number: 0 Document Number: Policy 10300.003 Effective Date: 07

  5. Post-2006 Renewable Energy Program (contracts/rd)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post-2006 Renewable Energy Program (updated November 10, 2005) This web page provides information related to the work of the Regional Dialogue Renewables Focus Group. This group...

  6. Energy Efficiency Post-2011 Review Scoping Document and Process...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    workgroups, please let BPA know in your submitted comments. I. Overview and Timeline The "Energy Efficiency Post-2011 Review" (Review) is a public process to review and consider...

  7. Exploring high temperature phenomena related to post-detonation...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Exploring high temperature phenomena related to post-detonation by an electric arc Citation Details In-Document Search Title: Exploring high temperature phenomena ...

  8. Exploring high temperature phenomena related to post-detonation...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Exploring high temperature phenomena related to post-detonation by an electric arc Citation Details In-Document Search Title: Exploring high temperature phenomena...

  9. Doc Cambell's Post Greenhouse Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Low Temperature Geothermal Facility Facility Doc Cambell's Post Sector Geothermal energy Type Greenhouse Location Las Cruces, New Mexico Coordinates 32.3123157,...

  10. Nuclear Safety Workshop Agenda- Post Fukushima Initiatives and Results

    Broader source: Energy.gov [DOE]

    The theme of this year's workshop was Post Fukushima Initiatives and Results. It featured keynote speakers and technical breakout sessions over two days.

  11. President Obama Announces More Key Administration Posts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Other assignments have included overseas postings in Seoul, Korea; Nassau, Bahamas; and Moscow, Russia. Ambassador Jacobson's Washington assignments have included service in State ...

  12. Energy Efficiency Post-2011 Review Scoping Document and Process...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Efficiency Post-2011 Policy Framework": provides the high level policy framework, such as energy efficiency costs collected the in Tier 1 rate and the Energy Efficiency Incentive...

  13. Post-Fabrication Placement of Arbitrary Chemical Functionality...

    Office of Scientific and Technical Information (OSTI)

    Post-Fabrication Placement of Arbitrary Chemical Functionality on Microphase-Separated Thin Films of Amine-Reactive Block Copolymers Citation Details In-Document Search Title: ...

  14. Microsoft Word - S05767_PostClosureInspRpt.doc

    Office of Legacy Management (LM)

    09 Doc. No. S05767 Page A-1 Post-Closure Inspection & Monitoring Report for CAU 417 U.S. Department of Energy Doc. No. S05767 October 2009 Page A-2 U.S. Department of Energy Post-Closure Inspection & Monitoring Report for CAU 417 October 2009 Doc. No. S05767 Page A-3 Post-Closure Inspection & Monitoring Report for CAU 417 U.S. Department of Energy Doc. No. S05767 October 2009 Page A-4 U.S. Department of Energy Post-Closure Inspection & Monitoring Report for CAU 417 October 2009

  15. Post-Closure Benefits: DOE Complex vs Closure Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Closure Sites Post-Closure Benefits: DOE Complex vs Closure Sites Status of Contractor Pension and PRB Benefit Programs - September 30, 2013 DOE Wide Closure Sites Defined Benefit...

  16. Post-Deactivation Surveillance and Maintenance Planning | Department of

    Energy Savers [EERE]

    Energy Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be

  17. Application Submittal Guidance for Stormwater Permits andPost...

    Open Energy Info (EERE)

    Post-Authorization Stormwater Permit CorrespondencePermittingRegulatory GuidanceGuideHandbook Abstract Application Submittal Guidance for Stormwater Permits and...

  18. Roadmapping Engine Technology for Post-2020 Heavy Duty Vehicles

    Broader source: Energy.gov [DOE]

    Discusses Detroit Diesel collaborative multi-year technology program which includes systematic experimental and analytical assessment of enabling technologies for post-2020 NAFTA line haul trucks

  19. FY 2013 Summary Report: Post-Irradiation Examination of Zircaloy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Report: Post-Irradiation Examination of Zircaloy-4 Samples in Target Capsules and Initiation of Bending Fatigue Testing for Used Nuclear Fuel Vibration Integrity ...

  20. Post-treatment control of HIV infection

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Conway, Jessica M.; Perelson, Alan S.

    2015-04-13

    Antiretroviral therapy (ART) for HIV is not a cure. However, recent studies suggest that ART, initiated early during primary infection, may induce post-treatment control (PTC) of HIV infection with HIV RNA maintained at <50 copies per mL. We investigate the hypothesis that ART initiated early during primary infection permits PTC by limiting the size of the latent reservoir, which, if small enough at treatment termination, may allow the adaptive immune response to prevent viral rebound (VR) and control infection. We use a mathematical model of within host HIV dynamics to capture interactions among target cells, productively infected cells, latently infectedmore » cells, virus, and cytotoxic T lymphocytes (CTLs). Analysis of our model reveals a range in CTL response strengths where a patient may show either VR or PTC, depending on the size of the latent reservoir at treatment termination. Below this range, patients will always rebound, whereas above this range, patients are predicted to behave like elite controllers. As a result, using data on latent reservoir sizes in patients treated during primary infection, we also predict population-level VR times for non-controllers consistent with observations.« less

  1. Post-treatment control of HIV infection

    SciTech Connect (OSTI)

    Conway, Jessica M.; Perelson, Alan S.

    2015-04-13

    Antiretroviral therapy (ART) for HIV is not a cure. However, recent studies suggest that ART, initiated early during primary infection, may induce post-treatment control (PTC) of HIV infection with HIV RNA maintained at <50 copies per mL. We investigate the hypothesis that ART initiated early during primary infection permits PTC by limiting the size of the latent reservoir, which, if small enough at treatment termination, may allow the adaptive immune response to prevent viral rebound (VR) and control infection. We use a mathematical model of within host HIV dynamics to capture interactions among target cells, productively infected cells, latently infected cells, virus, and cytotoxic T lymphocytes (CTLs). Analysis of our model reveals a range in CTL response strengths where a patient may show either VR or PTC, depending on the size of the latent reservoir at treatment termination. Below this range, patients will always rebound, whereas above this range, patients are predicted to behave like elite controllers. As a result, using data on latent reservoir sizes in patients treated during primary infection, we also predict population-level VR times for non-controllers consistent with observations.

  2. Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    SciTech Connect (OSTI)

    Idaho Cleanup Project

    2006-06-01

    The Waste Calcining Facility (WCF) is located at the Idaho Nuclear Technology and Engineering Center. In 1998, the WCF was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the WCF to ensure continued protection of human health and the environment. The post-closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report.

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2007-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal burrows observed at CAU 453 were backfilled. Cracking observed in three monuments at CAU 487 was repaired using sealant during the May 9, 2006, inspection. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2008-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

  5. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  6. Quality Work Plan Training Requirement

    Broader source: Energy.gov [DOE]

    Weatherization Assistance Program's comprehensive Quality Work Plan requirements and resources to meet this obligation in the field.

  7. Determination of post-DNB and post-BT fuel design limits. [PWR; BWR

    SciTech Connect (OSTI)

    Croucher, D.W.; Loyd, R.J.

    1980-01-01

    Categories of light water reactor transients and the departure from nucleate boiling (DNB) and boiling transition (BT) fuel design limits in light water reactors are reviewed. These fuel design limits for reactor licensing may be overly conservative because experiments have shown that fuel rods do not fail and may not experience damage as a result of momentary operation in film boiling or dryout conditions. Damage to the fuel rod is strongly dependent on the peak cladding temperature and the length of time at that temperature durng the transient. Testing of two potential licensing fuel design limits is suggested: (a) fuel rod functional capabilities are retained and fuel system dimensions remain within operational telerances; and (b) cladding deformation is permitted, but no significant oxidation is allowed. Damage mechanisms which may affect post-DNB or post-BT operation of fuel rods are permanent rod bowing and pellet-cladding interaction. The data necessary to support a fuel design limit and a means of obtaining these data are outlined.

  8. Part B - Requirements & Funding Information PART B - Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.a. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is for...

  9. 1D GAS-DYNAMIC SIMULATION OF SHOCK-WAVE PROCESSES VIA INTERNET

    SciTech Connect (OSTI)

    Khishchenko, K. V.; Levashov, P. R.; Povarnitsyn, M. E.; Zakharenkov, A. S.

    2009-12-28

    We present a Web-interface for 1D simulation of different shock-wave experiments. The choosing of initial parameters, the modeling itself and output data treatment can be made directly via the Internet. The interface is based upon the expert system on shock-wave data and equations of state and contains both the Eulerian and Lagrangian Godunov hydrocodes. The availability of equations of state for a broad set of substances makes this system a useful tool for planning and interpretation of shock-wave experiments. As an example of simulation with the system, results of modeling of multistep shock loading of potassium between polytetrafluoroethylene and stainless steel plates are presented in comparison with experimental data from Shakhray et al.(2005).

  10. Post combustion trials at Dofasco`s KOBM furnace

    SciTech Connect (OSTI)

    Farrand, B.L.; Wood, J.E.; Goetz, F.J.

    1992-12-31

    Post combustion trials were conducted at Dofasco`s 300 tonne KOBM furnace as part of the AISI Direct Steelmaking Program. The purpose of the project work was to measure the post combustion ratio (PCR) and heat transfer efficiency (HTE) of the post combustion reaction in a full size steelmaking vessel. A method of calculating PCR and HTE using off gas analysis and gas temperature was developed. The PCR and HTE were determined under normal operating conditions. Trials assessed the effect of lance height, vessel volume, foaming slag and pellet additions on PCR and HTE.

  11. Washington Post Energy Conference Presented by Areva | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post Energy Conference Presented by Areva Washington Post Energy Conference Presented by Areva November 8, 2007 - 4:21pm Addthis Remarks Prepared for Secretary Bodman Washington, DC - Thank you very much for that kind introduction and for inviting me to join you here today. My thanks also to The Washington Post. You all have spent the entire day discussing our global energy situation and, in fact, many of you have devoted your careers to these issues. So, you will not be surprised to hear me say

  12. Secretary Chu Speaks at Washington Post Live | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington Post Live Secretary Chu Speaks at Washington Post Live November 3, 2011 - 9:12am Addthis Secretary Chu Secretary Chu Former Secretary of Energy Secretary Chu's remarks, as prepared for delivery, at the Washington Post Smart Energy Conference. Thank you, Mary [Jordan], for that kind introduction. While the focus of this conference is on the future of energy, I want to start with some lessons from America's past. On a windy day at Kitty Hawk on December 17, 1903, the Wright Brothers

  13. First NESAP Post-doc Takes on BoxLib

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First NESAP Post-doc Takes on BoxLib First NESAP Post-doc Takes on BoxLib Brian Friesen to Work with Ann Almgren's Group in CCSE June 22, 2015 brianfriesenphoto Brian Friesen, PhD The first of eight post-doctoral researchers participating in the NERSC Exascale Science Applications Program (NESAP) is now working full time at NERSC. Brian Friesen, a graduate student in computational astrophysics at the University of Oklahoma, joined the NESAP team May 18. He's been assigned to Ann Almgren's group

  14. Post-Holiday Holiday Shopping | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Holiday Holiday Shopping Post-Holiday Holiday Shopping January 10, 2012 - 4:31pm Addthis Elizabeth Spencer Communicator, National Renewable Energy Laboratory Ah, January. It's still cold and it's still dark all the time, but now all the cheerful Christmas lights have come down so there's nothing to break up the monotony. What's there to do? Well, while it's a little late now, you might want to go do some post-holiday holiday shopping. Yes, I know. That sounds insane. Everyone is thoroughly

  15. Microsoft Word - S05767_PostClosureInspRpt.doc

    Office of Legacy Management (LM)

    NDEP Correspondence and Record of Review This page intentionally left blank U.S. Department of Energy Post-Closure Inspection & Monitoring Report for CAU 417 October 2009 Doc. No. S05767 Page D-1 Post-Closure Inspection & Monitoring Report for CAU 417 U.S. Department of Energy Doc. No. S05767 October 2009 Page D-2 U.S. Department of Energy Post-Closure Inspection & Monitoring Report for CAU 417 October 2009 Doc. No. S05767 Page D-3 Due Date 12-23-09 Review No. 1 Project Offsites -

  16. National Carbon Capture Center Launches Post-Combustion Test Center |

    Office of Environmental Management (EM)

    Department of Energy Carbon Capture Center Launches Post-Combustion Test Center National Carbon Capture Center Launches Post-Combustion Test Center June 7, 2011 - 1:00pm Addthis Washington, D.C. - The recent successful commissioning of an Alabama-based test facility is another step forward in research that will speed deployment of innovative post-combustion carbon dioxide (CO2) capture technologies for coal-based power plants, according to the U.S. Department of Energy (DOE). Technologies

  17. Minutes of the coordination workshop on DOE nuclear data program services via the internet

    SciTech Connect (OSTI)

    Smith, D.L.; Dunford, C.L.

    1996-11-01

    This workshop was convened to explore what is currently being done in the area of data dissemination via the Internet and to examine ways that future activities in this area within the U.S. nuclear data programs can be better coordinated. Overview talks on the current status, from both the national and international perspectives, were provided. Following these, there were presentations on specific activities in the area of Internet data dissemination which are taking place at seven different institutions. Institutions represented at this meeting were asked to provide written summaries of their programs before the meeting. The talks included actual demonstrations of the electronic methodologies which are under development at these laboratories, and they highlighted the richness and creativity of these programs. This information proved to be very useful in the ensuing general discussions. The main issues that were addressed at this meeting were: (i) how to adapt to rapid evolution of data management and dissemination technologies, (ii) how to provide outside users with some sense of unity in the U.S. nuclear data program and to develop consistent, user-friendly ways to access data without discouraging individual initiatives and the richness which comes from diversity, (iii) how to maintain quality control over the information and services provided, (iv) how to progress in a era of very restrictive budgets, (v) how to effectively merge the nuclear structure and nuclear reaction data dissemination activities while at the same time recognizing and respecting their inherent differences, (vi) how to organize the stewardship of nuclear data and the processes of nuclear data dissemination in an efficient, technically advanced and yet cost effective manner, and (vii) how the data processing tasks should be allocated between server and client computers.

  18. Analysis of the Quality of Information Obtained About Uterine Artery Embolization From the Internet

    SciTech Connect (OSTI)

    Tavare, Aniket N.; Alsafi, Ali Hamady, Mohamad S.

    2012-12-15

    Purpose: The Internet is widely used by patients to source health care-related information. We sought to analyse the quality of information available on the Internet about uterine artery embolization (UAE). Materials and Methods: We searched three major search engines for the phrase 'uterine artery embolization' and compiled the top 50 results from each engine. After excluding repeated sites, scientific articles, and links to documents, the remaining 50 sites were assessed using the LIDA instrument, which scores sites across the domains of accessibility, usability, and reliability. The Fleisch reading ease score (FRES) was calculated for each of the sites. Finally, we checked the country of origin and the presence of certification by the Health On the Net Foundation (HONcode) as well as their effect on LIDA and FRES scores.ResultsThe following mean scores were obtained: accessibility 48/60 (80%), usability 42/54 (77%), reliability 20/51 (39%), total LIDA 110/165 (67%), and FRES 42/100 (42%). Nine sites had HONcode certification, and this was associated with significantly greater (p < 0.05) reliability and total LIDA and FRES scores. When comparing sites between United Kingdom and United States, there was marked variation in the quality of results obtained when searching for information on UAE (p < 0.05). Conclusion: In general, sites were well designed and easy to use. However, many scored poorly on the reliability of their information either because they were produced in a non-evidence-based way or because they lacking currency. It is important that patients are guided to reputable, location-specific sources of information online, especially because prominent search engine rank does not guarantee reliability of information.

  19. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    SciTech Connect (OSTI)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, and 528.

  20. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  1. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    Silvas, A. J.

    2014-03-26

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: Management of physical and engineering controls such as fences, signs, and soil covers Management of institutional and administrative controls such as use restrictions and real estate systems Management of monitoring and maintenance programs Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.

  2. Vacancy Announcements Posted for Hydrogen Production and Delivery Program

    Broader source: Energy.gov [DOE]

    The Fuel Cell Technologies Office has posted two vacancy announcements for a position to serve as Program Manager for the Hydrogen Production and Delivery Program in the DOE EERE Fuel Cell Technologies Office. The closing date is October 28, 2014.

  3. Post Oak Bend City, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    is a stub. You can help OpenEI by expanding it. Post Oak Bend City is a town in Kaufman County, Texas. It falls under Texas's 5th congressional district.12 References...

  4. Roadmapping Engine Technology for Post-2020 Heavy Duty Vehicles...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    post-2020 NAFTA line haul trucks PDF icon deer11gruden.pdf More Documents & Publications High-Efficiency Engine Technologies Session Introduction The New ICE Age The New ICE Age

  5. PostScriptum UK Ltd | Open Energy Information

    Open Energy Info (EERE)

    Product: PostScriptum is a private equity group holding a portfolio of investments in start-up and niche situations, primarily but not exclusively in the energy sector. References:...

  6. Post-Award Deliverables Sample (Part 2 of Sample Deliverables...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Award Deliverables Sample (Part 2 of Sample Deliverables for Task Orders, IDIQ Attachment. J-4) Post-Award Deliverables Sample (Part 2 of Sample Deliverables for Task Orders, IDIQ...

  7. Post-Combustion CO2 Control | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compressing captured CO2 from atmospheric pressure to pipeline pressure (1,200-2,200 ... NETL's post-combustion CO2 control technology R&D program includes projects directed at ...

  8. Instructions for Accessing FedConnect Postings, June 30, 2009

    Broader source: Energy.gov [DOE]

    Instructions for Accessing FedConnect Postings and applying for Federal grants including the Smart Grid Investment Grants awarded as part of the American Recovery and Reinvestment Act of 2009.

  9. Microsoft Word - Post-2011 Review DRAFT Scoping Document_09162013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of fiscal year 2011, BPA adopted a Post-2011 energy efficiency program strategy and policy for the agency through a public process. The process resulted in two documents that...

  10. Energy Efficiency Post-2011 Review Scoping Document and Process...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of fiscal year 2011, BPA adopted a Post-2011 energy efficiency program strategy and policy for the agency through a public process. The process resulted in two documents that...

  11. Subject: BPA Post-2011 Energy Efficiency Review Update #9 -Reminder...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    epost2011review@bpa.gov Sent: Tuesday, April 29, 2014 Subject: BPA Post-2011 Energy Efficiency Review Update 9 -Reminder Regional Meeting 3 Afternoon of May 8 and New Early...

  12. Post-Doctoral Fellowship Opening in Emerging Technologies Program

    Broader source: Energy.gov [DOE]

    The Building Technologies Office is seeking a post-doctoral fellow for its Emerging Technologies program in Washington, D.C. The fellowship is part of the Department of Energy’s EERE Science and Technology Policy (STP) Fellowships program

  13. Federal Requirements for the Web

    Broader source: Energy.gov [DOE]

    Federal laws and requirements govern the Office of Energy Efficiency and Renewable Energy (EERE) with regards to its websites and other digital media.

  14. World's Largest Post-Combustion Carbon Capture Project Begins

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction | Department of Energy World's Largest Post-Combustion Carbon Capture Project Begins Construction World's Largest Post-Combustion Carbon Capture Project Begins Construction July 15, 2014 - 9:55am Addthis News Media Contact 202-586-4940 Department of Energy Supported Project Will Capture 1.4 Million Tons of CO2 Annually Washington, D.C. - Today, the Department of Energy - in partnership with NRG Energy Inc. and JX Nippon - announced that construction has begun on the first

  15. 2014 SSL Market Development Workshop Presentations Posted | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Market Development Workshop Presentations Posted 2014 SSL Market Development Workshop Presentations Posted November 21, 2014 - 1:55pm Addthis More than 175 attendees gathered at the ninth annual DOE Solid-State Lighting Market Development Workshop, held November 12-13 in Detroit, to learn the latest on today's toughest LED lighting issues and to find out what's next on the horizon. Detroit Mayor Mike Duggan kicked off the meeting, followed by Byron Auguste, Deputy Director of the

  16. President Obama Announces More Key Administration Posts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy July 8, 2011 - 12:00am Addthis THE WHITE HOUSE Office of the Press Secretary WASHINGTON - Today, President Barack Obama announced his intent to nominate the following individuals to key Administration posts: Michael A. Hammer, Assistant Secretary for Public Affairs, Department of State Charles McConnell, Assistant Secretary for Fossil Energy, Department of Energy The President also announced his intent to appoint the following individuals to key Administration posts: Terry Guen,

  17. President Obama Announces More Key Administration Posts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy November 29, 2011 - 4:34pm Addthis THE WHITE HOUSE Office of the Press Secretary FOR IMMEDIATE RELEASENovember 29, 2011 President Obama Announces More Key Administration Posts WASHINGTON, DC - Today, President Barack Obama announced his intent to nominate the following individuals to key Administration posts: Frederick "Rick" Barton - Assistant Secretary for Conflict and Stabilization Operations and Coordinator for Reconstruction and Stabilization, Department of State Arun

  18. Program Evaluation: Post-Review Activities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Review Activities Program Evaluation: Post-Review Activities Activities after the peer review include finalizing the program response, action plans and tracking, and evaluating the process. Finalizing Program Response It is important that the appropriate experts/staff/managers are consulted on the review findings and have time to discuss and respond before the report is provided to senior management. Review leaders and program managers should attempt to respond to findings and

  19. Post-Fabrication Placement of Arbitrary Chemical Functionality on

    Office of Scientific and Technical Information (OSTI)

    Microphase-Separated Thin Films of Amine-Reactive Block Copolymers (Journal Article) | SciTech Connect Post-Fabrication Placement of Arbitrary Chemical Functionality on Microphase-Separated Thin Films of Amine-Reactive Block Copolymers Citation Details In-Document Search Title: Post-Fabrication Placement of Arbitrary Chemical Functionality on Microphase-Separated Thin Films of Amine-Reactive Block Copolymers Authors: Speetjens, F.W. ; Carter, M.C.D. ; Kim, M. ; Gopalan, P. ; Mahanthappa,

  20. Post-Polymerization Crosslinked Polyurethane Shape-Memory Polymers (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Post-Polymerization Crosslinked Polyurethane Shape-Memory Polymers Citation Details In-Document Search Title: Post-Polymerization Crosslinked Polyurethane Shape-Memory Polymers Authors: Hearon, K ; Gall, K ; Ware, T ; Maitland, D J ; Bearinger, J P ; Wilson, T S Publication Date: 2010-04-22 OSTI Identifier: 1129122 Report Number(s): LLNL-JRNL-430624 DOE Contract Number: W-7405-ENG-48 Resource Type: Journal Article Resource Relation: Journal Name: Journal of Applied

  1. HD Truck and Engine Fuel Efficiency Opportunities and Challenges Post

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA2010 | Department of Energy Truck and Engine Fuel Efficiency Opportunities and Challenges Post EPA2010 HD Truck and Engine Fuel Efficiency Opportunities and Challenges Post EPA2010 The key to successful commercialization of clean and efficient ICEs is technology integration to meet customer expectations at cost, quality, timing, and reliability PDF icon deer09_lei.pdf More Documents & Publications Supertruck - Development and Demonstration of a Fuel-Efficient Class 8 Tractor &

  2. Diverse and divergent protein post-translational modifications in two

    Office of Scientific and Technical Information (OSTI)

    growth stages of a natural microbial community (Journal Article) | SciTech Connect Diverse and divergent protein post-translational modifications in two growth stages of a natural microbial community Citation Details In-Document Search Title: Diverse and divergent protein post-translational modifications in two growth stages of a natural microbial community Detailed characterization of posttranslational modifications (PTMs) of proteins in microbial communities remains a significant

  3. Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sampling | Department of Energy Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Nonaqueous-Phase Liquid Characterization and Post-Remediation Verification Sampling Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds. May 2004, Monterey, California. Charles Tabor, Randall Juhlin, Paul Darr, Julian Caballero, Joseph Daniel, David Ingle PDF icon Nonaqueous-Phase Liquid Characterization and

  4. Los Alamos taps Sarrao for science leadership post

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alamos taps Sarrao for science leadership post Los Alamos taps Sarrao for science leadership post John Sarrao named as the new Associate Director for Theory, Simulation, and Computation (ADTSC). March 5, 2013 John Sarrao John Sarrao Contact Kevin Roark Communications Office (505) 665-9202 / (505) 699-5397 Email John is a world-class scientist with a distinguished record of discoveries and international recognition. LOS ALAMOS, N. M., March 5, 2013-Los Alamos National Laboratory has named John

  5. 2015 Connected Lighting Systems Meeting Presentations Posted | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Connected Lighting Systems Meeting Presentations Posted 2015 Connected Lighting Systems Meeting Presentations Posted December 2, 2015 - 4:44pm Addthis On November 16, more than 260 experts from the lighting, semiconductor, and IT industries gathered in Portland at DOE's inaugural Connected Lighting Systems Meeting. The purpose of the meeting was to share perspectives and lay the groundwork for government/industry collaboration on the convergence of intelligent controllable light

  6. 2015 SSL Technology Development Workshop Presentations Posted | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy SSL Technology Development Workshop Presentations Posted 2015 SSL Technology Development Workshop Presentations Posted December 2, 2015 - 4:43pm Addthis More than 230 attendees participated in the tenth annual DOE Solid-State Lighting Technology Development Workshop, held November 17-18 in Portland, OR, to learn the latest on today's toughest LED lighting issues and to find out what's next on the horizon. The workshop offered a rich mix of perspectives and insights from a diverse

  7. Responses Posted to DOE Inaugural National Collegiate Wind Competition RFP

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Questions | Department of Energy Responses Posted to DOE Inaugural National Collegiate Wind Competition RFP Questions Responses Posted to DOE Inaugural National Collegiate Wind Competition RFP Questions January 30, 2013 - 12:00am Addthis The RFP and responses to technical questions (Amendment 1) are available on the Federal Business Opportunities website, solicitation number RFC-3-23003. The deadline is February 19 at 5 p.m. Mountain Time. On January 8, 2013, the U.S. Department of Energy's

  8. Webinar: Hydrogen Storage Materials Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Materials Requirements," originally presented on June 25, 2013. In addition to this text version of the audio, you can access the presentation slides. Alli Aman: Thanks so much for joining today's webinar. I'm going to go through a few housekeeping items before I turn it over to today's presenters. First of all, today's webinar is being recorded, so along with slides and that recording, we'll post that to our website in about ten days, so definitely check back. However, I will also be

  9. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    SciTech Connect (OSTI)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

  10. Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H SPECIAL CONTRACT REQUIREMENTS Request for Proposal # DE-RP36-07GO97036 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries.............................................................................................1 H.2 Workforce Transition ........................................................................................................1 H.3 Employee Compensation: Pay and

  11. Post Irradiation Evaluation of Thermal Control Coatings and Solid Lubricants to Support Fission Surface Power Systems

    SciTech Connect (OSTI)

    Bowman, Cheryl L.; Jaworske, Donald A.; Stanford, Malcolm K.; Persinger, Justin A.; Khorsandi, Behrooz; Blue, Thomas E.

    2007-01-30

    The development of a nuclear power system for space missions, such as the Jupiter Icy Moons Orbiter or a lunar outpost, requires substantially more compact reactor design than conventional terrestrial systems. In order to minimize shielding requirements and hence system weight, the radiation tolerance of component materials within the power conversion and heat rejection systems must be defined. Two classes of coatings, thermal control paints and solid lubricants, were identified as material systems for which limited radiation hardness information was available. Screening studies were designed to explore candidate coatings under a predominately fast neutron spectrum. The Ohio State Research Reactor Facility staff performed irradiation in a well characterized, mixed energy spectrum and performed post irradiation analysis of representative coatings for thermal control and solid lubricant applications. Thermal control paints were evaluated for 1 MeV equivalent fluences from 1013 to 1015 n/cm2. No optical degradation was noted although some adhesive degradation was found at higher fluence levels. Solid lubricant coatings were evaluated for 1 MeV equivalent fluences from 1015 to 1016 n/cm2 with coating adhesion and flexibility used for post irradiation evaluation screening. The exposures studied did not lead to obvious property degradation indicating the coatings would have survived the radiation environment for the previously proposed Jupiter mission. The results are also applicable to space power development programs such as fission surface power for future lunar and Mars missions.

  12. Automotive Turbocharging: Industrial Requirements and Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbocharging: Industrial Requirements and Technology Developments Automotive Turbocharging: Industrial Requirements and Technology Developments Significant improvements in...

  13. Post Closure Safety of the Morsleben Repository

    SciTech Connect (OSTI)

    Preuss, J.; Eilers, G.; Mauke, R.; Moeller-Hoeppe, N.; Engelhardt, H.-J.; Kreienmeyer, M.; Lerch, C.; Schrimpf, C.

    2002-02-26

    After the completion of detailed studies of the suitability the twin-mine Bartensleben-Marie, situated in the Federal State of Saxony-Anhalt (Germany), was chosen in 1970 for the disposal of low and medium level radioactive waste. The waste emplacement started in 1978 in rock cavities at the mine's fourth level, some 500 m below the surface. Until the end of the operational phase in 1998 in total about 36,800 m{sup 3} of radioactive waste was disposed of. The Morsleben LLW/ILW repository (ERAM) is now under licensing for closure. After completing the licensing procedure the repository will be sealed and backfilled to exclude any undue future impact onto man or the environment. The main safety objective is to protect the biosphere from the harmful effects of the disposed radionuclides. Furthermore, classical or conventional requirements call for ruling out or minimizing other unfavorable environmental effects. The ERAM is an abandoned rock salt and potash mine. As a consequence it has a big void volume, however small parts of the cavities are backfilled with crushed salt rocks. Other goals of the closure concept are therefore a long-term stabilization of the cavities to prevent a dipping or buckling of the ground surface. In addition, groundwater protection shall be assured. For the sealing of the repository a closure concept was developed to ensure compliance with the safety protection objectives. The concept anticipates the backfilling of the cavities with hydraulically setting backfill materials (salt concretes). The reduction of the remaining void volume in the mine causes in the case of brine intrusions a limitation of the leaching processes of the exposed potash seams. However, during the setting process the hydration heat of the concrete will lead to an increase of the temperature and hence to thermally induced stresses of the concrete and the surrounding rocks. Therefore, the influence of these stresses and deformations on the stability of the salt body and the integrity of the geological barrier was examined by 2D and 3D thermo-mechanical computations. The compliance of the safety objectives are proved on the basis of safety evidence criteria. It can be concluded that the closure concept is able to serve all conventional and radiological safety objectives.

  14. BGE Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BGE Communications Requirements BGE Communications Requirements Chart of BGE Communications Requirements PDF icon BGE Communications Requirements More Documents & Publications Chart of communications requirements Lower Colorado River Authority Lower Colorado River Authority

  15. Chart of communications requirements | Department of Energy

    Office of Environmental Management (EM)

    Chart of communications requirements Chart of communications requirements Chart of communications requirements for BGE PDF icon Chart of communications requirements More Documents & Publications BGE Communications Requirements Lower Colorado River Authority Lower Colorado River Authority

  16. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  17. Program Evaluation: Minimum EERE Requirements

    Broader source: Energy.gov [DOE]

    The minimum requirements for EERE's in-progress peer reviews are described below. Given the diversity of EERE programs and activities, a great deal of flexibility is provided within these...

  18. GREEN + IDMaps: A practical soulution for ensuring fairness in a biased internet

    SciTech Connect (OSTI)

    Kapadia, A. C.; Thulasidasan, S.; Feng, W. C.

    2002-01-01

    GREEN is a proactive queue-management (PQM) algorithm that removes TCP's bias against connections with longer round-trip times, while maintaining high link utilization and low packet-loss. GREEN applies knowledge of the steady-state behavior of TCP connections to proactively drop packets, thus preventing congestion from ever occurring. As a result, GREEN ensures much higher fairness between flows than other active queue management schemes like Flow Random Early Drop (FRED) and Stochastic Fair Blue (SFB), which suffer in topologies where a large number of flows have widely varying round-trip times. GREEN'S performance relies on its ability to gauge a flow's round-trip time (RTT). In previous work, we presented results for an ideal GREEN router which has accurate RTT information for a flow. In this paper, we present a practical solution based on IDMaps, an Internet distance-estimation service, and compare its performance to an ideal GREEN router. We show that a solution based on IDMaps is practical and maintains high fairness and link utilization, and low packet-loss rates.

  19. Mathematical modelling of post combustion in Dofasco's KOBM

    SciTech Connect (OSTI)

    Gou, H.; Irons, G.A.; Lu, W.K.

    1992-01-01

    In the AISI Direct Steelmaking program, trials were undertaken in Dofasco's 300 Tonne KOBM to examine post combustion. To support this work, a two-dimensional turbulent mathematical model has been developed to describe gas flow, combustion reactions and heat transfer (radiation and convection) in converter-type steelmaking processes. Gaseous flow patterns, temperature and heat flux distributions in the furnace were calculated with this model. Key findings are: The post combustion ratio is determined from the rates of oxygen supply, oxygen used for decarburization and the remainder available for post combustion, i.e. deducible from a mass balance calculation, comparison between the heat transfer fluxes calculated based on the model and those measured industrially indicates that the conventionally defined heat transfer efficiency over-estimates the heat recovered by the bath by about 20%, and the location of the combustion zone can be controlled, to a certain extent, by adjusting the lance practice.

  20. Mathematical modelling of post combustion in Dofasco`s KOBM

    SciTech Connect (OSTI)

    Gou, H.; Irons, G.A.; Lu, W.K.

    1992-12-31

    In the AISI Direct Steelmaking program, trials were undertaken in Dofasco`s 300 Tonne KOBM to examine post combustion. To support this work, a two-dimensional turbulent mathematical model has been developed to describe gas flow, combustion reactions and heat transfer (radiation and convection) in converter-type steelmaking processes. Gaseous flow patterns, temperature and heat flux distributions in the furnace were calculated with this model. Key findings are: The post combustion ratio is determined from the rates of oxygen supply, oxygen used for decarburization and the remainder available for post combustion, i.e. deducible from a mass balance calculation, comparison between the heat transfer fluxes calculated based on the model and those measured industrially indicates that the conventionally defined heat transfer efficiency over-estimates the heat recovered by the bath by about 20%, and the location of the combustion zone can be controlled, to a certain extent, by adjusting the lance practice.

  1. NaIrO3A Pentavalent Post-perovskite

    SciTech Connect (OSTI)

    M Bremholm; S Dutton; P Stephens; R Cava

    2011-12-31

    Sodium iridium (V) oxide, NaIrO{sub 3}, was synthesized by a high pressure solid state method and recovered to ambient conditions. It is found to be isostructural with CaIrO{sub 3}, the much-studied structural analog of the high-pressure post-perovskite phase of MgSiO{sub 3}. Among the oxide post-perovskites, NaIrO{sub 3} is the first example with a pentavalent cation. The structure consists of layers of corner- and edge-sharing IrO{sub 6} octahedra separated by layers of NaO{sub 8} bicapped trigonal prisms. NaIrO{sub 3} shows no magnetic ordering and resistivity measurements show non-metallic behavior. The crystal structure, electrical and magnetic properties are discussed and compared to known post-perovskites and pentavalent perovskite metal oxides.

  2. Posting and Labeling for Radiological Control Guide for use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-05-24

    This Guide provides an acceptable methodology for establishing and operating a radiological hazard posting and labeling program that will comply with U.S. Department of Energy (DOE) requirements specified in Title 10 of the Code of Federal Regulations (CFR), Part 835, Occupational Radiation Protection Canceled by DOE G 441.1-1B.

  3. Secretary Chu Webchat with the Washington Post | Department of Energy

    Energy Savers [EERE]

    Webchat with the Washington Post Secretary Chu Webchat with the Washington Post April 22, 2010 - 12:00am Addthis Washington, DC - Today, on the 40th anniversary of Earth Day, Secretary Chu participated in an online chat on washingtonpost.com. He answered questions on a number of topics, from energy efficiency to clean energy manufacturing. You can read the full transcript here: http://www.washingtonpost.com/wp-dyn/content/discussion/2010/04/22/DI2010042201410.html?hpid=discussions Media

  4. National Carbon Capture Center Launches Post-Combustion Test Center |

    Office of Environmental Management (EM)

    Department of Energy Carbon Capture Center Launches Post-Combustion Test Center National Carbon Capture Center Launches Post-Combustion Test Center June 6, 2011 - 2:32pm Addthis Jenny Hakun What does this mean for me? Commercial deployment of the processes tested here could cut carbon pollution. Innovation is important to finding ways to make energy cleaner. And testing the ideas and processes that researchers come up with is critical to moving ideas from the lab to the marketplace. That's

  5. New Membrane Technology for Post-Combustion Carbon Capture Begins

    Office of Environmental Management (EM)

    Pilot-Scale Test | Department of Energy Membrane Technology for Post-Combustion Carbon Capture Begins Pilot-Scale Test New Membrane Technology for Post-Combustion Carbon Capture Begins Pilot-Scale Test January 26, 2015 - 8:14am Addthis A promising new technology sponsored by the U.S. Department of Energy (DOE) for economically capturing 90 percent of the carbon dioxide (CO2) emitted from a coal-burning power plant has begun pilot-scale testing. The technology is the PolarisTM membrane

  6. Delaware Company Breathes New Life into Old Post Office Building |

    Office of Environmental Management (EM)

    Department of Energy Company Breathes New Life into Old Post Office Building Delaware Company Breathes New Life into Old Post Office Building November 26, 2013 - 12:51pm Addthis Thanks to the Energy Department, Delaware-based Brandywine CAD Design was able to breathe new life into a local historic building while saving on its energy costs. | Photo courtesy of Brandywine CAD Design. Thanks to the Energy Department, Delaware-based Brandywine CAD Design was able to breathe new life into a local

  7. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP/NP Requirements Review 2013 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 HEP Attendees 2013 FES Requirements Review 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  8. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  9. Johnson Noise Thermometry System Requirements

    SciTech Connect (OSTI)

    Britton Jr, Charles L; Roberts, Michael; Ezell, N Dianne Bull; Qualls, A L; Holcomb, David Eugene

    2013-01-01

    This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

  10. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  11. OMB Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security &

  12. Microsoft Word - S07566_Requirements

    Office of Environmental Management (EM)

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  13. Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2001

    SciTech Connect (OSTI)

    K. B. Campbell

    2002-01-01

    Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5 , 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 453 consists of the following: (1) Visual site inspections are conducted twice a year to evaluate the condition of the cover. (2) Verification that the site is secure and the condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 15, 2001 and November 6, 2001. Both site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

  14. An Internet-based interactive module for air emissions from fossil fuel based power generation

    SciTech Connect (OSTI)

    Karman, D.; O`Leary, K.; O`Reilly, S.

    1997-12-31

    The proliferation of the Internet, Web pages and associated software tools available for developing multimedia material provides significant opportunities in training, education and information transfer. This paper will describe the development, testing and evaluation of an interactive teaching module aimed at college and university students that have previous education in thermodynamics and basic chemistry. The module is currently in development at the Department of Civil and Environmental Engineering at Carleton University with support from Environment Canada. Preliminary testing of this module is expected to begin late January. The module contains options to look at CO, CO{sub 2}, SO{sub 2} and NO{sub x} emissions associated with electric power generation in thermal stations that use coal, natural gas, crude and distillate oil. Factors governing the thermal efficiency of typical boiler systems and the thermodynamic limitations for converting heat into work are discussed. Supporting background information such as emission trends and emission factors used in calculations are also included as part of this module. A simple Rankine cycle without reheat or regeneration is considered to compare the emissions per unit energy delivered from each of the fuels considered. For natural gas and distillate oil, combined cycle operation is considered with a gas turbine-heat recovery steam generator combination replacing the boiler in the simple Rankine cycle. For all fuels, the cogeneration option is investigated by expanding the steam to an intermediate pressure in the turbine and utilizing the remaining heat by condensing the steam in a heat recovery application. Emission factors and basic information on CO, SO{sub 2} and NO{sub x} control technologies are utilized to calculate and report the emissions per unit energy delivered under the various scenarios investigated.

  15. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  16. POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-04-01

    This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and anchoring straw bales in the wash to help control erosion at the Five Points Landfill. CAU 407 repairs included erosion repair, reseeding the cover, and replacement of one warning sign. CAU 424 repairs included filling topographically low areas to the surrounding grade. This was performed at Landfill Cell A3-1 (CAS 03-08-001-A301) and Landfill Cell A3-4 (CAS 03-08-002-A304). CAU 427 maintenance activities included placing additional red rocks over the subsurface site markers during the July inspection to assist in locating them for future inspections. CAU 487 repairs included installing eight above-grade monuments to mark the use restriction boundaries, installing use restriction warning signs, stamping coordinates on the brass survey markers, and subsidence repair at the A-8 anomaly. With the completion of these repairs and maintenance activities, all CAUs were in excellent condition at the end of 2004. The site inspections should continue as scheduled, and any potential problem areas, such as repaired areas of erosion or subsidence, should be monitored closely for further maintenance or repair needs.

  17. Future missions require improving LANSCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future missions require improving LANSCE capabilities to support five principal research areas. 1) Improving capabilities at the Lujan Center-to use neutrons to probe soft materials-will improve understanding of the performance and aging of weapons materials, and will support development of the broad spectrum of materials needed for stockpile stewardship and threat reduction. 2) Enhancing high-accuracy nuclear cross-section measurements of actinide and short-lived isotopes for higher-fidelity

  18. New Solutions Require New Thinking

    Office of Environmental Management (EM)

    Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication

  19. Post-processing V&V level II ASC milestone (2360) results.

    SciTech Connect (OSTI)

    Chavez, Elmer; Karelitz, David B.; Brunner, Thomas A.; Trucano, Timothy Guy; Moreland, Kenneth D.; Weirs, V. Gregory; Shead, Timothy M.

    2007-09-01

    The 9/30/2007 ASC Level 2 Post-Processing V&V Milestone (Milestone 2360) contains functionality required by the user community for certain verification and validation tasks. These capabilities include loading of edge and face data on an Exodus mesh, run-time computation of an exact solution to a verification problem, delivery of results data from the server to the client, computation of an integral-based error metric, simultaneous loading of simulation and test data, and comparison of that data using visual and quantitative methods. The capabilities were tested extensively by performing a typical ALEGRA HEDP verification task. In addition, a number of stretch criteria were met including completion of a verification task on a 13 million element mesh.

  20. Spot restoration for GPR image post-processing

    DOE Patents [OSTI]

    Paglieroni, David W; Beer, N. Reginald

    2014-05-20

    A method and system for detecting the presence of subsurface objects within a medium is provided. In some embodiments, the imaging and detection system operates in a multistatic mode to collect radar return signals generated by an array of transceiver antenna pairs that is positioned across the surface and that travels down the surface. The imaging and detection system pre-processes the return signal to suppress certain undesirable effects. The imaging and detection system then generates synthetic aperture radar images from real aperture radar images generated from the pre-processed return signal. The imaging and detection system then post-processes the synthetic aperture radar images to improve detection of subsurface objects. The imaging and detection system identifies peaks in the energy levels of the post-processed image frame, which indicates the presence of a subsurface object.

  1. Advanced Post-Irradiation Examination Capabilities Alternatives Analysis Report

    SciTech Connect (OSTI)

    Jeff Bryan; Bill Landman; Porter Hill

    2012-12-01

    An alternatives analysis was performed for the Advanced Post-Irradiation Capabilities (APIEC) project in accordance with the U.S. Department of Energy (DOE) Order DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The Alternatives Analysis considered six major alternatives: ? No Action ? Modify Existing DOE Facilities – capabilities distributed among multiple locations ? Modify Existing DOE Facilities – capabilities consolidated at a few locations ? Construct New Facility ? Commercial Partnership ? International Partnerships Based on the alternatives analysis documented herein, it is recommended to DOE that the advanced post-irradiation examination capabilities be provided by a new facility constructed at the Materials and Fuels Complex at the Idaho National Laboratory.

  2. Historical Information H.3 Post-Event Reports

    Office of Legacy Management (LM)

    s Historical Information H.3 Post-Event Reports Book 1 Project Rulison Post-Shot Information - Offsite Radiological Safety Programs-Soils DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. oFFs I b I o l o c I c n i snEw PROGRAMS - i i . s ' . f l O F F S I E - R A D I O L O G I C A L SAFETY PROGRAMS - I I SO1 L; DTD 4(2/3ID, - 2/L9/72 ' - A r : U N I T E D STATES . . ATOMIC ENERGY C O M M I S S I O N

  3. EFFECTS EYALUATION POST-SHOT RE-ENTRY

    Office of Legacy Management (LM)

    9-12 8 (Preliminary) EFFECTS EYALUATION POST-SHOT RE-ENTRY PROJECT RULISON ( u ) November 1 1 , 1969 Contract A~(29-2)-1229 U .S . Atomic Energy Commission Nevada Operations O f f i c e Las Vegas, Nevada Hydrogeology S e c t i o n ISOTOPES, A TELEDYNE C O M P A V Y P a l o A l t o L a b o r a t o r i e s 4062 Fabian S t r e e t P a l o A l t o , C a l i f o r n i a 94303 I. INTRODUCTION Post-event d r i l l b a c k a t P r o j e c t RULISON w i l l r e s u l t i n t h e r e l e a s e o f

  4. President Obama Announces More Key Administration Posts | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy December 10, 2010 - 12:00am Addthis WASHINGTON - Today, President Barack Obama announced his intent to nominate the following individuals to key Administration posts: Peter B. Lyons, Assistant Secretary for Nuclear Energy, Department of Energy Denise E. O'Donnell, Director of the Bureau of Justice Assistance, Department of Justice Stephanie O'Sullivan, Principal Deputy Director of National Intelligence, Directorate of National Intelligence David Shear, Ambassador to the Socialist

  5. President Obama Announces More Key Administration Posts | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy WASHINGTON, DC - Today, President Barack Obama announced his intent to nominate the following individuals for key administration posts: Joe Garcia, Director of the Office of Minority Economic Impact, Department of Energy Michael H. Posner, Assistant Secretary of State for Democracy, Human Rights, and Labor, Department of State Stephen J. Rapp, Ambassador at Large for War Crimes Issues, Department of State Alexander G. Garza, Assistant Secretary for Health Affairs and Chief Medical

  6. Post Critical Decision-4 Mark Arenaz, Federal Project Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31, 2011 Lessons Learned from the In-Situ Grouting in the Subsurface Disposal Area Post Critical Decision-4 Mark Arenaz, Federal Project Director Summary Protection of the Snake River Plain Aquifer is a major driver for environmental remediation at the Department of Energy's (DOE) Idaho Site. In 2010, the Idaho Cleanup Project (ICP) used in-situ grouting to stabilize buried waste and reduce the migration of specific radioactive contaminates to the aquifer. The action was accomplished using

  7. Post-Shred Materials Recovery Technology Development and Demonstration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Shred Materials Recovery Technology Development and Demonstration Post-Shred Materials Recovery Technology Development and Demonstration 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. PDF icon lm_29_jody.pdf More Documents & Publications Overview of Recycling Technology R&D FY 2008 Progress Report for Lightweighting Materials - 11. Recycling FY 2009 Progress Report for

  8. Microsoft Word - S05767_PostClosureInspRpt.doc

    Office of Legacy Management (LM)

    2009 Revegetation Success Monitoring This page intentionally left blank 2009 Revegetation Success Monitoring Central Nevada Test Area Corrective Action Unit 417 UC-1 Central Mud Pit This page intentionally left blank U.S. Department of Energy Post-Closure Inspection & Monitoring Report for CAU 417 October 2009 Doc No. S05767 Page C-i Contents 1.0 Introduction and Purpose ..................................................................................................C-1 2.0 Monitoring

  9. President Obama Announces More Key Administration Posts | Department of

    Energy Savers [EERE]

    Energy April 17, 2009 - 12:00am Addthis WASHINGTON, DC - Today, President Barack Obama announced his intent to nominate the following individuals for key administration posts: Christine M. Griffin, Deputy Director of Office of Personnel Management; Kevin Concannon, Under Secretary for Food, Nutrition and Consumer Services, United States Department of Agriculture; Rajiv Shah, Under Secretary for Research, Education, and Economics, United States Department of Agriculture; Michael Nacht,

  10. President Obama Announces More Key Administration Posts | Department of

    Energy Savers [EERE]

    Energy December 9, 2009 - 12:00am Addthis WASHINGTON - Today, President Barack Obama announced his intent to nominate the following individuals to key administration posts: Patricia A. Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, Department of Energy Mari Del Carmen Aponte, Ambassador to the Republic of El Salvador, Department of State Donald E. Booth, Ambassador to the Federal Democratic Republic of Ethiopia, Department of State Larry Persily, Federal

  11. President Obama Announces More Key Administration Posts | Department of

    Energy Savers [EERE]

    Energy January 29, 2010 - 12:00am Addthis THE WHITE HOUSE Office of the Press Secretary WASHINGTON - Today, President Barack Obama announced his intent to nominate the following individuals to key administration posts: Jeffrey A. Lane, Assistant Secretary for Congressional and Intergovernmental Affairs, Department of Energy Larry Robinson, Assistant Secretary of Commerce (Conservation and Management), NOAA, Department of Commerce Paul Steven Miller, Governor, Board of Governors of the United

  12. President Obama Announces More Key Administration Posts | Department of

    Energy Savers [EERE]

    Energy August 2, 2011 - 9:20pm Addthis WASHINGTON - Today, President Barack Obama announced his intent to nominate the following individuals to key Administration posts: Ashton B. Carter - Nominee for Deputy Secretary of Defense, Department of Defense I. Charles McCullough III - Inspector General of the Intelligence Community, Office of the Director of National Intelligence Ernest Mitchell, Jr. - Administrator, United States Fire Administration, Federal Emergency Management Agency,

  13. Energy' TEfl9 Associated Post Office Box 117

    Office of Legacy Management (LM)

    yoD Oak Ridge Energy' TEfl9 Associated Post Office Box 117 environment (S\_J Universities Oak Ridge. Tennessee 37831-011 Systems Division July 26, 1991 Mr. James Wagoner, II FUSRAP Program Manager Decontamination and Decommissioning Division Office of Environmental Restoration and Waste Management U.S. Department of Energy Washington, DC 20545 Subject: DRAFT VERIFICATION SURVEY OF PARCEL 1A ELZA GATE SITE, OAK RIDGE, TENNESSEE Dear Mr. Wagoner: l Enclosed are five copies of the draft report for

  14. The Hidden Job Requirements for a Software Engineer

    SciTech Connect (OSTI)

    Marinovici, Maria C.; Kirkham, Harold; Glass, Kevin A.

    2014-01-09

    In a world increasingly operated by computers, where innovation depends on software, the software engineers role is changing continuously and gaining new dimensions. In commercial software development as well as scientific research environments, the way software developers are perceived is changing, because they are more important to the business than ever before. Nowadays, their job requires skills extending beyond the regular job description posted by HR, and more is expected. To advance and thrive in their new roles, the software engineers must embrace change, and practice the themes of the new era (integration, collaboration and optimization). The challenges may be somehow intimidating for freshly graduated software engineers. Through this paper the authors hope to set them on a path for success, by helping them relinquish their fear of the unknown.

  15. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly ...

  16. Requirements for Bridge Inspection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National Bridge Inventory Record Data Submission Requirement

  17. Network Requirements Workshop - Documents and Background Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » Documents and Background Materials Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR

  18. Government Printing Office Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Printing Office Requirements Government Printing Office Requirements This section describes the Government Printing Office (GPO) requirements for all print materials, whether printed electronically or on paper. This includes requirements for printing and copying for all EERE publications. Approved Printers Executive Order 12873, signed by President Clinton, requires that all government offices and their contractors are required to use GPO-approved printers to print and copy all

  19. Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000

    SciTech Connect (OSTI)

    K. B. Campbell

    2001-06-01

    Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

  20. Genome informatics: Requirements and challenges

    SciTech Connect (OSTI)

    Robbins, R.J.

    1993-12-31

    Informatics of some kind will play a role in every aspect of the Human Genome Project (HGP); data acquisition, data analysis, data exchange, data publication, and data visualization. What are the real requirements and challenges? The primary requirement is clear thinking and the main challenge is design. If good design is lacking, the price will be failure of genome informatics and ultimately failure of the genome project itself. Scientists need good designs to deliver the tools necessary for acquiring and analyzing DNA sequences. As these tools become more efficient, they will need new tools for comparative genomic analyses. To make the tools work, the scientists will need to address and solve nomenclature issues that are essential, if also tedious. They must devise systems that will scale gracefully with the increasing flow of data. The scientists must be able to move data easily from one system to another, with no loss of content. As scientists, they will have failed in their responsibility to share results, should repeating experiments ever become preferable to searching the literature. Their databases must become a new kind of scientific literature and the scientists must develop ways to make electronic data publishing as routine as traditional journal publishing. Ultimately, they must build systems so advanced that they are virtually invisible. In summary, the HGP can be considered the most ambitious, most audacious information-management project ever undertaken. In the HGP, computers will not merely serve as tools for cataloging existing knowledge. Rather, they will serve as instruments, helping to create new knowledge by changing the way the scientists see the biological world. Computers will allow them to see genomes, just as radio telescopes let them see quasars and electron microscopes let them see viruses.

  1. Type Ia supernovae from merging white dwarfs. II. Post-merger...

    Office of Scientific and Technical Information (OSTI)

    Type Ia supernovae from merging white dwarfs. II. Post-merger detonations Citation Details In-Document Search Title: Type Ia supernovae from merging white dwarfs. II. Post-merger ...

  2. Recent advances in nuclear fission theory: pre- and post-scission...

    Office of Scientific and Technical Information (OSTI)

    nuclear fission theory: pre- and post-scission physics Citation Details In-Document Search Title: Recent advances in nuclear fission theory: pre- and post-scission physics You ...

  3. C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management Cleanup, Sep 2011 C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management ...

  4. Performance, power, and energy of in-situ and post-processing visualization

    SciTech Connect (OSTI)

    Adhinarayanan, Vignesh

    2015-10-05

    The goal of this project was to "study the performance, power, and energy trade-offs among traditional post-processing, modern post-processing, and in-situ visualization pipelines."

  5. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  6. California Waste Discharge Requirements Website | Open Energy...

    Open Energy Info (EERE)

    Requirements Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California Waste Discharge Requirements Website Abstract This website contains...

  7. Studying the Communications Requirements of Electric Utilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities to...

  8. Requirements Based Surveillance and Maintenance Review Process...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form PDF icon Requirements Based ...

  9. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised,...

  10. Civilian Radioactive Waste Management System Requirements Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level...

  11. Alteration and modulation of protein activity by varying post-translational modification

    DOE Patents [OSTI]

    Thompson, David N; Reed, David W; Thompson, Vicki S; Lacey, Jeffrey A; Apel, William A

    2015-03-03

    Embodiments of the invention include methods of altering the enzymatic activity or solubility of an extremophilic enzyme or post-translationally modifying a protein of interest via using isolated or partially purified glycosyltransferases and/or post-translational modification proteins, extracts of cells comprising glycosyltransferases and/or post-translational modification proteins, and/or in cells comprising one or more glycosyltransferases and/or post-translational modification proteins.

  12. Energy Advising Services in the Post-ARRA World | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Advising Services in the Post-ARRA World Energy Advising Services in the Post-ARRA World Better Buildings Residential Network Workforce / Business Partners Peer Exchange Call: Energy Advising Services in the Post-ARRA World, Call Slides and Summary, June 27, 2013. This peer exchange call discussed energy advising services in the post--ARRA world. PDF icon Call Slides and Summary More Documents & Publications Implementation Plan Template Better Buildings Neighborhood Program Business

  13. Assessment of LED Technology in Ornamental Post-Top Luminaires. Sacramento, CA

    SciTech Connect (OSTI)

    Tuenge, J. R.; Bryan, M. M.; Bisbee, D. A.

    2011-12-01

    GATEWAY program report on a demonstration of LED ornamental post-top luminaires in a residential part of Sacramento, CA.

  14. Post-Installation Report Outline (IDIQ Attachment J-9) | Department of

    Energy Savers [EERE]

    Energy Post-Installation Report Outline (IDIQ Attachment J-9) Post-Installation Report Outline (IDIQ Attachment J-9) Document offers a post-installation report outline sample for an energy savings performance contract. Microsoft Office document icon mv_post_report.doc More Documents & Publications Measurement and Verification Plan and Savings Calculations Methods Outline (IDIQ Attachment J-8) Annual Report Outline (IDIQ Attachment J-10) ESPC Task Order Financial Schedules (IDIQ

  15. Cooling Post: US lab to research caloric cooling materials | The Ames

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Cooling Post: US lab to research caloric cooling materials News on the Ames Laboratory-led research consortium CaloriCool was carried on the Cooling Post website. The UK-based Cooling Post carries stories of interest to the air conditioning and refrigeration industry from around the world. Read the story HERE.

  16. The Light Post, The Consortium E-Newsletter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Light Post, The Consortium E-Newsletter The Light Post, The Consortium E-Newsletter PDF icon January 2015 More Documents & Publications Solid-State Lighting Consortia High Performance Outdoor Lighting Accelerator OCTOBER 2015 POSTINGS Solid-State Lighting Home About the Solid-State Lighting Program Research & Development SSL Basics Using LEDs Information Resources Financial Opportunities

  17. Post World War II missions emerge for Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Post World War II missions emerge for Y-12 During the period immediately after World War II, Y-12 underwent tremendous change. A location built for one purpose alone - that being to separate uranium 235 for the world's first atomic bomb actually used in war - had done that mission and done it well. The war was over! But little time was actually taken for celebration of Y-12's achievement, rather the focus was on the winning of the war, not precisely how it was done. Oh, there was the

  18. Microsoft Word - ORNL_ADCP_POST_PROCESSING_CODES_FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ORNL ADCP POST-PROCESSING GUIDE AND MATLAB ALGORITHMS FOR MHK SITE FLOW AND TURBULENCE ANALYSIS September 2011 Prepared by Budi Gunawan, Ph.D. Vincent S. Neary, Ph.D., P.E. DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge. Web site http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source. National Technical

  19. Chapter 6 - Competition Requirements | Department of Energy

    Energy Savers [EERE]

    6 - Competition Requirements Chapter 6 - Competition Requirements PDF icon 6.1_Competition_Requirements_0.pdf PDF icon 6.5_Competition_Advocate_Responsibilities_0.pdf More Documents & Publications AcqGuide 5.2-OPAM Competition Requirements Microsoft Word - AG Chapter 6 1 Nov 20

  20. Grantee Checklist for the Inspection & Monitoring Requirement

    Broader source: Energy.gov [DOE]

    This document walks Grantees through the Inspection and Monitoring requirement of the Quality Work Plan.

  1. Quality Work Plan Inspection and Monitoring Requirement

    Broader source: Energy.gov [DOE]

    Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

  2. Voltage measurements at the vacuum post-hole convolute of the ? pulsed-power accelerator

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Waisman, E.? M.; McBride, R. D.; Cuneo, M.? E.; Wenger, D.? F.; Fowler, W.? E.; Johnson, W.? A.; Basilio, L.? I.; Coats, R.? S.; Jennings, C.? A.; Sinars, D.? B.; et al

    2014-11-08

    Presented are voltage measurements taken near the load region on the Z pulsed-power accelerator using an inductive voltage monitor (IVM). Specifically, the IVM was connected to, and thus monitored the voltage at, the bottom level of the accelerators vacuum double post-hole convolute. Additional voltage and current measurements were taken at the accelerators vacuum-insulator stack (at a radius of 1.6 m) by using standard D-dot and B-dot probes, respectively. During postprocessing, the measurements taken at the stack were translated to the location of the IVM measurements by using a lossless propagation model of the Z accelerators magnetically insulated transmission lines (MITLs)moreand a lumped inductor model of the vacuum post-hole convolute. Across a wide variety of experiments conducted on the Z accelerator, the voltage histories obtained from the IVM and the lossless propagation technique agree well in overall shape and magnitude. However, large-amplitude, high-frequency oscillations are more pronounced in the IVM records. It is unclear whether these larger oscillations represent true voltage oscillations at the convolute or if they are due to noise pickup and/or transit-time effects and other resonant modes in the IVM. Results using a transit-time-correction technique and Fourier analysis support the latter. Regardless of which interpretation is correct, both true voltage oscillations and the excitement of resonant modes could be the result of transient electrical breakdowns in the post-hole convolute, though more information is required to determine definitively if such breakdowns occurred. Despite the larger oscillations in the IVM records, the general agreement found between the lossless propagation results and the results of the IVM shows that large voltages are transmitted efficiently through the MITLs on Z. These results are complementary to previous studies [R.D. McBride et al., Phys. Rev. ST Accel. Beams 13, 120401 (2010)] that showed efficient transmission of large currents through the MITLs on Z. Taken together, the two studies demonstrate the overall efficient delivery of very large electrical powers through the MITLs on Z.less

  3. Voltage measurements at the vacuum post-hole convolute of the Z pulsed-power accelerator

    SciTech Connect (OSTI)

    Waisman, E. M.; McBride, R. D.; Cuneo, M. E.; Wenger, D. F.; Fowler, W. E.; Johnson, W. A.; Basilio, L. I.; Coats, R. S.; Jennings, C. A.; Sinars, D. B.; Vesey, R. A.; Jones, B.; Ampleford, D. J.; Lemke, R. W.; Martin, M. R.; Schrafel, P. C.; Lewis, S. A.; Moore, J. K.; Savage, M. E.; Stygar, W. A.

    2014-12-08

    Presented are voltage measurements taken near the load region on the Z pulsed-power accelerator using an inductive voltage monitor (IVM). Specifically, the IVM was connected to, and thus monitored the voltage at, the bottom level of the accelerators vacuum double post-hole convolute. Additional voltage and current measurements were taken at the accelerators vacuum-insulator stack (at a radius of 1.6 m) by using standard D-dot and B-dot probes, respectively. During postprocessing, the measurements taken at the stack were translated to the location of the IVM measurements by using a lossless propagation model of the Z accelerators magnetically insulated transmission lines (MITLs) and a lumped inductor model of the vacuum post-hole convolute. Across a wide variety of experiments conducted on the Z accelerator, the voltage histories obtained from the IVM and the lossless propagation technique agree well in overall shape and magnitude. However, large-amplitude, high-frequency oscillations are more pronounced in the IVM records. It is unclear whether these larger oscillations represent true voltage oscillations at the convolute or if they are due to noise pickup and/or transit-time effects and other resonant modes in the IVM. Results using a transit-time-correction technique and Fourier analysis support the latter. Regardless of which interpretation is correct, both true voltage oscillations and the excitement of resonant modes could be the result of transient electrical breakdowns in the post-hole convolute, though more information is required to determine definitively if such breakdowns occurred. Despite the larger oscillations in the IVM records, the general agreement found between the lossless propagation results and the results of the IVM shows that large voltages are transmitted efficiently through the MITLs on Z. These results are complementary to previous studies [R. D. McBride et al., Phys. Rev. ST Accel. Beams 13, 120401 (2010)] that showed efficient transmission of large currents through the MITLs on Z. Altogether, the two studies demonstrate the overall efficient delivery of very large electrical powers through the MITLs on Z.

  4. Voltage measurements at the vacuum post-hole convolute of the Z pulsed-power accelerator

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Waisman, E. M.; McBride, R. D.; Cuneo, M. E.; Wenger, D. F.; Fowler, W. E.; Johnson, W. A.; Basilio, L. I.; Coats, R. S.; Jennings, C. A.; Sinars, D. B.; et al

    2014-12-08

    Presented are voltage measurements taken near the load region on the Z pulsed-power accelerator using an inductive voltage monitor (IVM). Specifically, the IVM was connected to, and thus monitored the voltage at, the bottom level of the accelerator’s vacuum double post-hole convolute. Additional voltage and current measurements were taken at the accelerator’s vacuum-insulator stack (at a radius of 1.6 m) by using standard D-dot and B-dot probes, respectively. During postprocessing, the measurements taken at the stack were translated to the location of the IVM measurements by using a lossless propagation model of the Z accelerator’s magnetically insulated transmission lines (MITLs)more » and a lumped inductor model of the vacuum post-hole convolute. Across a wide variety of experiments conducted on the Z accelerator, the voltage histories obtained from the IVM and the lossless propagation technique agree well in overall shape and magnitude. However, large-amplitude, high-frequency oscillations are more pronounced in the IVM records. It is unclear whether these larger oscillations represent true voltage oscillations at the convolute or if they are due to noise pickup and/or transit-time effects and other resonant modes in the IVM. Results using a transit-time-correction technique and Fourier analysis support the latter. Regardless of which interpretation is correct, both true voltage oscillations and the excitement of resonant modes could be the result of transient electrical breakdowns in the post-hole convolute, though more information is required to determine definitively if such breakdowns occurred. Despite the larger oscillations in the IVM records, the general agreement found between the lossless propagation results and the results of the IVM shows that large voltages are transmitted efficiently through the MITLs on Z. These results are complementary to previous studies [R. D. McBride et al., Phys. Rev. ST Accel. Beams 13, 120401 (2010)] that showed efficient transmission of large currents through the MITLs on Z. Altogether, the two studies demonstrate the overall efficient delivery of very large electrical powers through the MITLs on Z.« less

  5. Stabilization of Fast Pyrolysis Oil: Post Processing Final Report

    SciTech Connect (OSTI)

    Elliott, Douglas C.; Lee, Suh-Jane; Hart, Todd R.

    2012-03-01

    UOP LLC, a Honeywell Company, assembled a comprehensive team for a two-year project to demonstrate innovative methods for the stabilization of pyrolysis oil in accordance with DOE Funding Opportunity Announcement (FOA) DE-PS36-08GO98018, Biomass Fast Pyrolysis Oil (Bio-oil) Stabilization. In collaboration with NREL, PNNL, the USDA Agricultural Research Service (ARS), Pall Fuels and Chemicals, and Ensyn Corporation, UOP developed solutions to the key technical challenges outlined in the FOA. The UOP team proposed a multi-track technical approach for pyrolysis oil stabilization. Conceptually, methods for pyrolysis oil stabilization can be employed during one or both of two stages: (1) during the pyrolysis process (In Process); or (2) after condensation of the resulting vapor (Post-Process). Stabilization methods fall into two distinct classes: those that modify the chemical composition of the pyrolysis oil, making it less reactive; and those that remove destabilizing components from the pyrolysis oil. During the project, the team investigated methods from both classes that were suitable for application in each stage of the pyrolysis process. The post processing stabilization effort performed at PNNL is described in this report. The effort reported here was performed under a CRADA between PNNL and UOP, which was effective on March 13, 2009, for 2 years and was subsequently modified March 8, 2011, to extend the term to December 31, 2011.

  6. Energy star compliant voice over internet protocol (VoIP) telecommunications network including energy star compliant VoIP devices

    DOE Patents [OSTI]

    Kouchri, Farrokh Mohammadzadeh

    2012-11-06

    A Voice over Internet Protocol (VoIP) communications system, a method of managing a communications network in such a system and a program product therefore. The system/network includes an ENERGY STAR (E-star) aware softswitch and E-star compliant communications devices at system endpoints. The E-star aware softswitch allows E-star compliant communications devices to enter and remain in power saving mode. The E-star aware softswitch spools messages and forwards only selected messages (e.g., calls) to the devices in power saving mode. When the E-star compliant communications devices exit power saving mode, the E-star aware softswitch forwards spooled messages.

  7. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section/ Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly implemented but not required. DOE-STD-1104-2014 will be required by DOE Order 420.1C, Page Change 1, soon to be approved (already concurred upon by the program offices and the Directives Review Board). DOE-STD-1104- 2014will now be a required method. For more discussion, see letter from Moniz to Winokur, October 18,

  8. Microsoft Word - S05767_PostClosureInspRpt.doc

    Office of Legacy Management (LM)

    U.S. Department of Energy Post-Closure Inspection & Monitoring Report for CAU 417 October 2009 Doc. No. S05767 Page B-1 Table 1. UC-1 Monument Elevations and Subsidence Elevation at Top of Monument a,b Subsidence (m) Date SM-1 N 6,430,874.2869 E 539,588.2339 SM-2 N 6,430,863.3239 E 539,644.8195 SM-3 N 6,430,855.2553 E 539,684.3327 SM-4 N 6,430,849.7763 E 539,715.7991 SM-5 N 6,430,852.0243 E 539,585.4651 SM-6 N 6,430,841.7590 E 539,641.4674 SM-7 N 6,430,834.5289 E 539,680.5243 SM-8 N

  9. land requirements | OpenEI Community

    Open Energy Info (EERE)

    land requirements Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv...

  10. Salt Lake City- High Performance Buildings Requirement

    Broader source: Energy.gov [DOE]

    Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

  11. Federal Prison Industries-Requirement for Market

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WWVv .acQnet.govfarlF ACfac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required...

  12. NERSC HPC Program Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads ASCR2017Final.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research - Target 2017 NerscBES2017ReqRevFinal.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Basic Energy Sciences - Target 2017

  13. Building America Retrofit Participation Requirements and Release

    Broader source: Energy.gov [DOE]

    This form is for Building America team members and homeowners to complete verifying health and safety requirements have been met.

  14. Requirements to coordinate agreements, milestones and decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental agreements,...

  15. DOE Challenge Home, California Program Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling

  16. Transportation Infrastructure Requirement Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Infrastructure Requirement Resources Transportation Infrastructure Requirement Resources Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum reduction path as an alternative to the mandate. Find infrastructure requirement resources below. DOE Resource Alternative Fuels Data Center: Natural Gas Fueling Infrastructure Development. Other Resource National

  17. Web Writing Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Web Writing Requirements When writing content for Office of Energy Efficiency and Renewable Energy (EERE) websites and applications, follow these requirements. Also see EERE's Web writing best practices. Plain Language Always follow the requirements of the Plain Writing Act of 2010. Introductory Text Introductory text, or "intro text" is the first 1-2 sentences on a Web page. This is indexed by search engines. Additionally, intro text is the first content on the Web page,

  18. Synthesis and equation of state of post-perovskites in the (Mg,Fe)[subscript 3]Al[subscript 2]Si[subscript 3]O[subscript 12] system

    SciTech Connect (OSTI)

    Shieh, Sean R.; Dorfman, Susannah M.; Kubo, Atsushi; Prakapenka, Vitali B.; Duffy, Thomas S.

    2012-02-06

    The formation and properties of the post-perovskite (CaIrO{sub 3}-type) phase were studied in Fe-rich compositions along the pyrope-almandine ((Mg,Fe){sub 3}Al{sub 2}Si{sub 3}O{sub 12}) join. Natural and synthetic garnet starting materials with almandine fractions from 38 to 90 mol% were studied using synchrotron X-ray diffraction in the laser-heated diamond anvil cell. Single-phase post-perovskite could be successfully synthesized from garnet compositions at pressures above 148 GPa and temperatures higher than 1600 K. In some cases, evidence for a minor amount of Al{sub 2}O{sub 3} post-perovskite was observed for Alm38 and Alm54 compositions in the perovskite + post-perovskite two-phase region. Pressure-volume data for the post-perovskite phases collected during decompression show that incorporation of Fe leads to a systematic increase of unit cell volume broadly similar to the variation observed in the (Mg,Fe)SiO{sub 3} system. The presence of Al{sub 2}O{sub 3} increases the stability of perovskite relative to post-perovskite, requiring higher pressures (> 148 GPa) for synthesis of pure post-perovskites. Our data together with those of Tateno et al. (2005) also suggest that in the Al-rich system the presence of Fe has no strong effect on the pressure required to synthesize the pure post-perovskite phase, but the two-phase perovskite and post-perovskite region may be broad and its width dependent on Fe content. Our results suggest that any regions highly enriched in Al{sub 2}O{sub 3} may consist of either the perovskite phase or a mixture of perovskite and post-perovskite phases throughout the entire thickness of the D* region. The observed synthesis pressures (> 148 GPa) for a pure post-perovskite phase are beyond that at the Earth's core-mantle boundary ({approx} 135 GPa).

  19. SIENA Customer Problem Statement and Requirements

    SciTech Connect (OSTI)

    L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

    2000-08-01

    This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

  20. Ionizing radiation post-curing of objects produced by stereolithography and other methods

    DOE Patents [OSTI]

    Howell, David H. (Knoxville, TN); Eberle, Claude C. (Knoxville, TN); Janke, Christopher J. (Oliver Springs, TN)

    2000-01-01

    An object comprised of a curable material and formed by stereolithography or another three-dimensional prototyping method, in which the object has undergone initial curing, is subjected to post-curing by ionizing radiation, such as an electron beam having a predetermined beam output energy, which is applied in a predetermined dosage and at a predetermined dose rate. The post-cured object exhibits a property profile which is superior to that which existed prior to the ionizing radiation post-curing.

  1. Technology-to-Market News and Blog Posts | Department of Energy

    Energy Savers [EERE]

    News and Blog Posts Technology-to-Market News and Blog Posts RSS March 18, 2016 Technology-to-Market News and Blog Posts Lab-Corps: Training National Lab Entrepreneurs to Take Clean Energy to Market EERE's Lab-Corps program teaches scientists and engineers from the National Laboratories about the challenges faced by industry, which takes the labs' breakthroughs and turns them into products for consumers. This training helps the labs partner more effectively with companies in commercializing

  2. Post-Treatment Hemodynamics of a Basilar Aneurysm and Bifurcation (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Post-Treatment Hemodynamics of a Basilar Aneurysm and Bifurcation Citation Details In-Document Search Title: Post-Treatment Hemodynamics of a Basilar Aneurysm and Bifurcation Aneurysm re-growth and rupture can sometimes unexpectedly occur following treatment procedures that were initially considered to be successful at the time of treatment and post-operative angiography. In some cases, this can be attributed to surgical clip slippage or endovascular coil

  3. Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned (Post

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CD-4), Environmental Management Cleanup, May 2011 | Department of Energy Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned (Post CD-4), Environmental Management Cleanup, May 2011 Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned (Post CD-4), Environmental Management Cleanup, May 2011 PDF icon 000646_EM-C_Soil_and_Groundwater_Cleanup_-_In-Situ_Grouting_Lessons_Learned_Post_CD-4_15_Jun_11.pdf More Documents & Publications Type B Accident Investigation Board

  4. FIA-13-0029 - In the Matter of Post Register | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 - In the Matter of Post Register FIA-13-0029 - In the Matter of Post Register On June 12, 2013, the Office of Hearings and Appeals (OHA) issued a decision remanding an appeal (Appeal) from a Freedom of Information Act (FOIA) determination issued by the Department of Energy's Idaho Operations Office (IOO). The Appellant, Post Register, contested the IOO's adequacy of search for responsive documents and determination that most of the requested documents were not agency records. The OHA concluded

  5. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects |

    Energy Savers [EERE]

    Department of Energy Reviewing Post-Installation and Annual Reports for Federal ESPC Projects Reviewing Post-Installation and Annual Reports for Federal ESPC Projects The purpose of this document is to provide a framework for implementing uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce standardized reviews, and enable centralized tracking of ongoing project

  6. Petra Nova Project Breaks Ground on World's Largest Post-Combustion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carbon Capture Project | Department of Energy Petra Nova Project Breaks Ground on World's Largest Post-Combustion Carbon Capture Project Petra Nova Project Breaks Ground on World's Largest Post-Combustion Carbon Capture Project September 5, 2014 - 11:13am Addthis Deputy Secretary Daniel Poneman (sixth from left) joins in the groundbreaking of the world's largest post-combustion carbon capture facility | Photo courtesy of the Energy Department. Deputy Secretary Daniel Poneman (sixth from

  7. Post-treatment of fly ash by ozone in a fixed bed reactor

    SciTech Connect (OSTI)

    Kim Hougaard Pedersen; Merc Casanovas Meli; Anker Degn Jensen; Kim Dam-Johansen

    2009-01-15

    The residual carbon in fly ash produced from pulverized coal combustion can adsorb the air-entraining admixtures (AEAs) added to enhance air entrainment in concrete. This behavior of the ash can be suppressed by exposing the fly ash to oxidizing species, which oxidizes the carbon surface and thus prevents the AEA to be adsorbed. In the present work, two fly ashes have been ozonated in a fixed bed reactor and the results showed that ozonation is a potential post-treatment method that can lower the AEA requirements of a fly ash up to 6 times. The kinetics of the carbon oxidation by ozone was found to be fast. A kinetic model has been formulated, describing the passivation of carbon, and it includes the stoichiometry of the ozone consumption (0.8 mol of O{sub 3}/kg of C) and an ineffective ozone loss caused by catalytic decomposition. The simulated results correlated well with the experimental data. 28 refs., 7 figs., 3 tabs.

  8. Simulating variable source problems via post processing of individual particle tallies

    SciTech Connect (OSTI)

    Bleuel, D.L.; Donahue, R.J.; Ludewigt, B.A.; Vujic, J.

    2000-10-20

    Monte Carlo is an extremely powerful method of simulating complex, three dimensional environments without excessive problem simplification. However, it is often time consuming to simulate models in which the source can be highly varied. Similarly difficult are optimization studies involving sources in which many input parameters are variable, such as particle energy, angle, and spatial distribution. Such studies are often approached using brute force methods or intelligent guesswork. One field in which these problems are often encountered is accelerator-driven Boron Neutron Capture Therapy (BNCT) for the treatment of cancers. Solving the reverse problem of determining the best neutron source for optimal BNCT treatment can be accomplished by separating the time-consuming particle-tracking process of a full Monte Carlo simulation from the calculation of the source weighting factors which is typically performed at the beginning of a Monte Carlo simulation. By post-processing these weighting factors on a recorded file of individual particle tally information, the effect of changing source variables can be realized in a matter of seconds, instead of requiring hours or days for additional complete simulations. By intelligent source biasing, any number of different source distributions can be calculated quickly from a single Monte Carlo simulation. The source description can be treated as variable and the effect of changing multiple interdependent source variables on the problem's solution can be determined. Though the focus of this study is on BNCT applications, this procedure may be applicable to any problem that involves a variable source.

  9. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    SciTech Connect (OSTI)

    Boehlecke, Robert F.

    2013-05-28

    This letter serves as the post-closure inspection letter report for corrective action units on the Nevada Naational Security Site for calendar year 2012.

  10. 328Post shot analysis of plasma conditions of Au Spheres illuminated...

    Office of Scientific and Technical Information (OSTI)

    Conference: 328Post shot analysis of plasma conditions of Au Spheres illuminated by the URLLE Omega laser, as measured via Thomson scattering Citation Details In-Document Search...

  11. 2014 DOE Hydrogen and Fuel Cells Program Annual Progress Report Posted

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Fuel Cell Technologies Office has posted the 2014 Hydrogen and Fuel Cells Program Annual Progress Report.

  12. Real-Time Particulate Mass Measurements Pre and Post Diesel Particulat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real-Time Particulate Mass Measurements Pre and Post Diesel Particulate Filters for ... Filter Loading and Regeneration Real-Time Measurement of Diesel Trap Efficiency ...

  13. Power Outages Update: Post-Tropical Cyclone Sandy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Outages Update: Post-Tropical Cyclone Sandy Power Outages Update: Post-Tropical Cyclone Sandy October 29, 2012 - 9:37pm Addthis Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. with top sustained winds of 80 mph. | Photo courtesy of NOAA Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. with top sustained winds of 80 mph. | Photo courtesy of NOAA Dan Leistikow Dan

  14. Demonstration Assessment of Light-Emitting Diode (LED) Post-Top Lighting at

    Office of Scientific and Technical Information (OSTI)

    Central Park in New York City (Technical Report) | SciTech Connect (LED) Post-Top Lighting at Central Park in New York City Citation Details In-Document Search Title: Demonstration Assessment of Light-Emitting Diode (LED) Post-Top Lighting at Central Park in New York City A review of five post-top light-emitting diode (LED) pedestrian luminaires installed in New York City's Central Park for possible replacement to the existing metal halide post-top luminaire. This report reviews the energy

  15. Recent advances in nuclear fission theory: pre- and post-scission...

    Office of Scientific and Technical Information (OSTI)

    Conference: Recent advances in nuclear fission theory: pre- and post-scission physics Citation Details In-Document Search Title: Recent advances in nuclear fission theory: pre- and ...

  16. Recent advances in nuclear fission theory: pre- and post-scission...

    Office of Scientific and Technical Information (OSTI)

    Recent advances in nuclear fission theory: pre- and post-scission physics Citation Details In-Document Search Title: Recent advances in nuclear fission theory: pre- and ...

  17. Regional Dialogue on Post-2006 Power Sales Contracts (pbl/contracts...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and information through July 19, 2007) Other Related Web Sites: Post-2006 Conservation Program (on BPA's Energy Efficiency web site) BPA's Future Role (on NWPCC web site)...

  18. ORNL ADV POST-PROCESSING GUIDE AND MATLAB ALGORITHMS FOR MHK SITE FLOW AND TURBULENCE ANALYSIS

    SciTech Connect (OSTI)

    Gunawan, Budi; Neary, Vincent S; McNutt, James R

    2011-10-01

    This report details standard protocols for post-processing acoustic Doppler velocimeter (ADV) measurements, including guidance on using a MATLAB code for such processing.

  19. OSS 19.10 Barriers and Postings 5/26/95

    Broader source: Energy.gov [DOE]

    The objective of this surveillance is to verify that the contractor is providing appropriate warnings to employees regarding hazards in the workplace. The Facility Representative examines posting...

  20. Securing NNSA's Nuclear Weapons Complex in a Post-9/11 World...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Securing NNSA's Nuclear Weapons Complex in a Post-911 World | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile ...

  1. Microfluidic molecular assay platform for the detection of miRNAs, mRNAs, proteins, and post-translational modifications at single-cell resolution

    SciTech Connect (OSTI)

    Wu, Meiye; Singh, Anup K.

    2014-07-15

    In this study, cell signaling is a dynamic and complex process. A typical signaling pathway may begin with activation of cell surface receptors, leading to activation kinase cascade that culminates in induction of mRNA and non-coding miRNA production in the nucleus, followed by modulation of mRNA expression by miRNAs in the cytosol, and end with production of proteins in response to the signaling pathway. Signaling pathways involve proteins, miRNA, and mRNAs, along with various forms of transient post-translational modifications, and detecting each type of signaling molecule requires categorically different sample preparation methods such as Western blotting for proteins, PCR for nucleic acids, and flow cytometry for post-translational modifications. Since we know that cells in populations behave heterogeneously1, especially in the cases of stem cells, cancer, and hematopoiesis, there is need for a new technology that provides capability to detect and quantify multiple categories of signaling molecules in intact single cells to provide a comprehensive view of the cell’s physiological state. In this technical brief, we describe our microfluidic platform with a portfolio of customized molecular assays that can detect nucleic acids, proteins, and post-translational modifications in single intact cells with >95% reduction in reagent requirement in under 8 hours.

  2. Microfluidic molecular assay platform for the detection of miRNAs, mRNAs, proteins, and post-translational modifications at single-cell resolution

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Wu, Meiye; Singh, Anup K.

    2014-07-15

    In this study, cell signaling is a dynamic and complex process. A typical signaling pathway may begin with activation of cell surface receptors, leading to activation kinase cascade that culminates in induction of mRNA and non-coding miRNA production in the nucleus, followed by modulation of mRNA expression by miRNAs in the cytosol, and end with production of proteins in response to the signaling pathway. Signaling pathways involve proteins, miRNA, and mRNAs, along with various forms of transient post-translational modifications, and detecting each type of signaling molecule requires categorically different sample preparation methods such as Western blotting for proteins, PCR formore » nucleic acids, and flow cytometry for post-translational modifications. Since we know that cells in populations behave heterogeneously1, especially in the cases of stem cells, cancer, and hematopoiesis, there is need for a new technology that provides capability to detect and quantify multiple categories of signaling molecules in intact single cells to provide a comprehensive view of the cell’s physiological state. In this technical brief, we describe our microfluidic platform with a portfolio of customized molecular assays that can detect nucleic acids, proteins, and post-translational modifications in single intact cells with >95% reduction in reagent requirement in under 8 hours.« less

  3. RERTR-12 Post-irradiation Examination Summary Report

    SciTech Connect (OSTI)

    Rice, Francine; Williams, Walter; Robinson, Adam; Harp, Jason; Meyer, Mitch; Rabin, Barry

    2015-02-01

    The following report contains the results and conclusions for the post irradiation examinations performed on RERTR-12 Insertion 2 experiment plates. These exams include eddy-current testing to measure oxide growth; neutron radiography for evaluating the condition of the fuel prior to sectioning and determination of fuel relocation and geometry changes; gamma scanning to provide relative measurements for burnup and indication of fuel- and fission-product relocation; profilometry to measure dimensional changes of the fuel plate; analytical chemistry to benchmark the physics burnup calculations; metallography to examine the microstructural changes in the fuel, interlayer and cladding; and microhardness testing to determine the material-property changes of the fuel and cladding. These characterization activities are tailored specifically to define: The mechanical response of fuel meat, cladding, and interlayers, including diffusion barrier integrity Whether geometry is stable and predictable; that changes in channel gap do not compromise ability to cool fuel That fuel performance is known and predictable A limited set of physical properties that are important for the analysis of fuel burnup limits Whether swelling is stable and predictable.

  4. Lysine carboxylation: unveiling a spontaneous post-translational modification

    SciTech Connect (OSTI)

    Jimenez-Morales, David; Adamian, Larisa; Shi, Dashuang; Liang, Jie

    2014-01-01

    A computational method for the prediction of lysine carboxylation (KCX) in protein structures is described. The method accurately identifies misreported KCXs and predicts previously unknown KCX sites. The carboxylation of lysine residues is a post-translational modification (PTM) that plays a critical role in the catalytic mechanisms of several important enzymes. It occurs spontaneously under certain physicochemical conditions, but is difficult to detect experimentally. Its full impact is unknown. In this work, the signature microenvironment of lysine-carboxylation sites has been characterized. In addition, a computational method called Predictor of Lysine Carboxylation (PreLysCar) for the detection of lysine carboxylation in proteins with available three-dimensional structures has been developed. The likely prevalence of lysine carboxylation in the proteome was assessed through large-scale computations. The results suggest that about 1.3% of large proteins may contain a carboxylated lysine residue. This unexpected prevalence of lysine carboxylation implies an enrichment of reactions in which it may play functional roles. The results also suggest that by switching enzymes on and off under appropriate physicochemical conditions spontaneous PTMs may serve as an important and widely used efficient biological machinery for regulation.

  5. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  6. Automotive Turbocharging: Industrial Requirements and Technology

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Developments | Department of Energy Turbocharging: Industrial Requirements and Technology Developments Automotive Turbocharging: Industrial Requirements and Technology Developments Significant improvements in turbocharger performance will be difficult to achieve requires a proper understanding of the trade-offs and engine effects and impacts must be part of turbocharger development PDF icon deer09_baines.pdf More Documents & Publications Advanced Boost System Development for Diesel

  7. Entry Requirements | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visiting Us / Entry Requirements Entry Requirements Identification and/or Citizenship Requirements When you arrive for your visit, please be prepared to provide us a form of government photo identification such as your driver's license or U.S. passport when you check in with Visitor Services. And, if you are an uncleared visitor - meaning you do not hold a federal security clearance - you will also be asked to complete some documentation to certify your U.S. citizenship. Once all of these

  8. DOE Challenge Home, Washington Program Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories

  9. Quality Work Plan Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Requirements Quality Work Plan Requirements The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance,

  10. Guidance & Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies

  11. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH)...

  12. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NP Program Offices. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  13. Federal / State Legislative & Regulatory Changes Required for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues Federal and State Blending Restrictions Action by ASTM NCWM to address higher ethanol blends PDF icon Federal State Legislative & Regulatory Changes Required for...

  14. Improving CSE Software through Reproducibility Requirements....

    Office of Scientific and Technical Information (OSTI)

    through Reproducibility Requirements. Abstract not provided. Authors: Heroux, Michael Allen Publication Date: 2011-02-01 OSTI Identifier: 1109282 Report Number(s): SAND2011-1158C...

  15. City of Dubuque- Solar Thermal Licensing Requirement

    Broader source: Energy.gov [DOE]

    Installers are also required to obtain a permit before altering or installing a system. Application details are available on the program website.

  16. Richard Gerber! Harvey Wasserman! Requirements Reviews Organizers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2 014 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading NERSC users & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Adv. C omp. S cience R esearch J an. 2 014 Basic E nergy S ciences O ct 2 014 Reports From 8 Requirements Reviews Have Been Published 3 h@p://www.nersc.gov/science/hpc---requirements---reviews/reports/ * CompuFng a nd s

  17. Memorandum, Clarification of Requirements for Certification in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    security plans and safety authorization bases. PDF icon Memorandum, Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human ...

  18. Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  19. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  20. Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  1. Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  2. News & Updates - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  3. Rescinded Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  4. UCNI Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UCNI Review Requirement UCNI Review Requirement What are the requirements for reviewing a document that may contain UCNI? § 1017.15(a) requires you to have a document that may contain UCNI reviewed by an UCNI Reviewing Offical. If you do not have an UCNI Reviewing Official in your organization, you must send the document outside your organization for review. When a document is transmitted outside of your organization prior to review, it must be marked "Protect as UCNI Pending Review"

  5. Physical Protection - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2A, Physical Protection by jcronin Functional areas: Security, This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys...

  6. All Required: Safety Training - Chris Westerfeldt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TUNL Summer 2013 Lectures & Tutorials Thursday May 30 st - 9 AM - 3:30 PM (LSRC Room A247) All Required: Safety Training - Chris Westerfeldt Friday May 31 st - 9 AM REU Required: TUNL, LENA & FEL Tour - (Meet in TUNL Lobby) Monday June 10 th - 10 AM - 11:30 AM (DFELL Conference Room, 117) REU Required: Building Blocks of Nuclei - Mohammad Ahmed Monday June 10 th - 2 PM - 3:30 PM (DFELL Conference Room, 117) REU Required: N-N Interactions and Local Accelerators - Mohammad Ahmed Wednesday

  7. Review Policy / Proposal Guidelines / Reporting Requirements...

    Office of Science (SC) Website

    Review Policy Proposal Guidelines Reporting Requirements High Energy Physics (HEP) HEP ... Advisory Committees Community Resources Contact Information High Energy Physics U.S. ...

  8. Biosafety Facilities - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Biosafety Facilities by David Freshwater Functional areas: Defense Nuclear Facility Safety and Health Requirement, Safety and Security, The Guide assists DOENNSA field elements...

  9. Thompson named VP of Northwest Requirements Marketing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thompson-named-VP-of-Northwest-Requirements-Marketing Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  10. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  11. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY ...

  12. Part V: Section H - Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H SPECIAL CONTRACT REQUIREMENTS DE-AC36-08GO28308 Modification M962 Section H - Page 2 of 52 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries ............................................................................................. 4 H.2 Reserved ............................................................................................................................ 4 H.3 Employee Compensation: Pay and Benefits

  13. Requirements for transporting the TMI-2 core

    SciTech Connect (OSTI)

    Wilkins, D.E.

    1983-08-01

    This report summarizes the requirements associated with the actual transport of core debris from the damaged Three Mile Island Unit 2 reactor to the Idaho National Engineering Laboratory. The requirements are discussed under six headings: accountability, security, quality, safety, environment, and transportation.

  14. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  15. Microsoft Word - Web Posting for Earned Value Management

    Office of Environmental Management (EM)

    CONTRACTOR EARNED VALUE MANAGEMENT SYSTEM CERTIFICATION STATUS (as of December 2, 2015) DOE Office (Geographic Site) Contract Name Contractor Name Principal Companies Certified Green = Yes Red = No Carlsbad Field Office (Carlsbad, NM) Waste Isolation Pilot Project Management and Operations Nuclear Waste Partnership, LLC URS Energy and Construction, Inc. Babcock & Wilcox Technical Services Group, LLC AREVA Federal Services, LLC No Capital Projects Requiring EVMS Savannah River (Aiken, SC)

  16. Post-accelerator issues at the IsoSpin Laboratory

    SciTech Connect (OSTI)

    Chattopadhyay, S.; Nitschke, J.M. [eds.

    1994-05-01

    The workshop on ``Post-Accelerator Issues at the Isospin Laboratory`` was held at the Lawrence Berkeley Laboratory from October 27--29, 1993. It was sponsored by the Center for Beam Physics in the Accelerator and Fusion Research Division and the ISL Studies Group in the Nuclear Science Division. About forty scientists from around the world participated vigorously in this two and a half day workshop, (c.f. Agenda, Appendix D). Following various invited review talks from leading practitioners in the field on the first day, the workshop focussed around two working groups: (1) the Ion Source and Separators working group and (2) the Radio Frequency Quadrupoles and Linacs working group. The workshop closed with the two working groups summarizing and outlining the tasks for the future. This report documents the proceedings of the workshop and includes the invited review talks, the two summary talks from the working groups and individual contributions from the participants. It is a complete assemblage of state-of-the-art thinking on ion sources, low-{beta}, low(q/A) accelerating structures, e.g. linacs and RFQS, isobar separators, phase-space matching, cyclotrons, etc., as relevant to radioactive beam facilities and the IsoSpin Laboratory. We regret to say that while the fascinating topic of superconducting low-velocity accelerator structure was covered by Dr. K. Shepard during the workshop, we can only reproduce the copies of the transparencies of his talk in the Appendix, since no written manuscript was available at the time of publication of this report. The individual report have been catologed separately elsewhere.

  17. Fact #872: May 11, 2015 Study Finds More than 60% of Millennials and Generation Xers Use the Internet to Find a Car Dealer While Less than Half of Baby Boomers Did – Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for Study Finds More than 60% of Millennials and Generation Xers Use the Internet to Find a Car Dealer While Less than Half of Baby Boomers Did

  18. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Environmental Management (EM)

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  19. Quality Assurance Source Requirements Traceability Database

    SciTech Connect (OSTI)

    MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

    2006-01-30

    At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

  20. Smart gun technology requirements preliminary report

    SciTech Connect (OSTI)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  1. Optical manufacturing requirements for an AVLIS plant

    SciTech Connect (OSTI)

    Primdahl, K.; Chow, R.; Taylor, J.R.

    1997-07-14

    A uranium enrichment plant utilizing Atomic Vapor Laser Isotope Separation (AVLIS) technology is currently being planned. Deployment of the Plant will require tens of thousands of commercial and custom optical components and subsystems. The Plant optical system will be expected to perform at a high level of optical efficiency and reliability in a high-average-power-laser production environment. During construction, demand for this large number of optics must be coordinated with the manufacturing capacity of the optical industry. The general requirements and approach to ensure supply of optical components is described. Dynamic planning and a closely coupled relationship with the optics industry will be required to control cost, schedule, and quality.

  2. HTGR Industrial Application Functional and Operational Requirements

    SciTech Connect (OSTI)

    L. E. Demick

    2010-08-01

    This document specifies the functional and performance requirements to be used in the development of the conceptual design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to a typical industrial facility. These requirements were developed from collaboration with industry and HTGR suppliers over the preceding three years to identify the energy needs of industrial processes for which the HTGR technology is technically and economically viable. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a conceptual design of the plant that will serve the broadest range of industrial applications.

  3. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  4. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  5. Pre/post-strike atmospheric assessment system (PAAS)

    SciTech Connect (OSTI)

    Peglow, S. G., LLNL; Molitoris, J. D., LLNL

    1997-02-03

    The Pre/Post-Strike Atmospheric Assessment System was proposed to show the importance of local meteorological conditions in the vicinity of a site suspected of storing or producing toxic agents and demonstrate a technology to measure these conditions, specifically wind fields. The ability to predict the collateral effects resulting from an attack on a facility containing hazardous materials is crucial to conducting effective military operations. Our study approach utilized a combination of field measurements with dispersion modeling to better understand which variables in terrain and weather were most important to collateral damage predictions. To develop the PAAS wind-sensing technology, we utilized a combination of emergent and available technology from micro-Doppler and highly coherent laser systems. The method used for wind sensing is to probe the atmosphere with a highly coherent laser beam. As the beam probes, light is back-scattered from particles entrained in the air to the lidar transceiver and detected by the instrument. Any motion of the aerosols with a component along the beam axis leads to a Doppler shift of the received light. Scanning in a conical fashion about the zenith results in a more accurate and two-dimensional measurement of the wind velocity. The major milestones in the benchtop system development were to verify the design by demonstrating the technique in the laboratory, then scale the design down to a size consistent with a demonstrator unit which could be built to take data in the field. The micro-Doppler heterodyne system we developed determines absolute motion by optically mixing a reference beam with the return signal and has shown motion sensitivity to better than 1 cm/s. This report describes the rationale, technical approach and laboratory testing undertaken to demonstrate the feasibility and utility of a system to provide local meteorological data and predict atmospheric particulate motion. The work described herein was funded by the Laboratory Science and Technology Office as a part of the 1996 Laboratory Directed Research and Development Program at Lawrence Livermore National Laboratory.

  6. Guam- Solar-Ready Residential Building Requirement

    Broader source: Energy.gov [DOE]

    The Guam Energy Code, which became effective in October of 2000, requires that piping stub outs be provided for water heaters installed in low-rise residential buildings to enable the future inst...

  7. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  8. San Bernardino County- Green Building Requirement

    Broader source: Energy.gov [DOE]

    In August 2007, the San Bernardino County Board of Supervisors approved a policy requiring that all new county buildings and major renovations be built to LEED Silver standards. The decision was...

  9. EPA State Manifest Requirements | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: EPA State Manifest RequirementsLegal Abstract Provided by the EPA, this website provides...

  10. Energy Efficiency Requirements for State Government

    Broader source: Energy.gov [DOE]

    Public Act No. 07-242 of 2007 established mandatory efficiency requirements for certain equipment purchased by the state. The Connecticut Department of Administrative Services and agencies with p...

  11. Requirements and Submission Process for Qualified Software

    Broader source: Energy.gov [DOE]

    This document provides a complete list of requirements and submission details to have software qualified for calculating energy and power cost savings for commercial building tax deductions under tax code Section 179D.

  12. Energy Star Procurement Requirement for Agencies

    Broader source: Energy.gov [DOE]

    SB 2300 was enacted June 25, 2009 and later codified into law. It requires future office equipment, appliances, lighting, and heating and cooling products and systems purchased by and for the state...

  13. Quality Assurance - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    services meet or exceed customers' requirements and expectations. Cancels DOE O 414.1C. Adm Chg 1, 5-8-13 o414.1d4-25-11.pdf -- PDF Document, 243 KB Writer: Colette Broussard...

  14. Communications Requirements of Smart Grid Technologies

    Broader source: Energy.gov [DOE]

    This report sets forth the findings of the U.S. Department of Energy (DOE) on the communications requirements of electric utilities and proposes specific recommendations for next steps to support...

  15. Deepwater Offshore Wind Technology Research Requirements (Poster)

    SciTech Connect (OSTI)

    Musial, W.

    2005-05-01

    A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

  16. Gas Test Loop Functional and Technical Requirements

    SciTech Connect (OSTI)

    Glen R. Longhurst; Soli T. Khericha; James L. Jones

    2004-09-01

    This document defines the technical and functional requirements for a gas test loop (GTL) to be constructed for the purpose of providing a high intensity fast-flux irradiation environment for developers of advanced concept nuclear reactors. This capability is needed to meet fuels and materials testing requirements of the designers of Generation IV (GEN IV) reactors and other programs within the purview of the Advanced Fuel Cycle Initiative (AFCI). Space nuclear power development programs may also benefit by the services the GTL will offer. The overall GTL technical objective is to provide developers with the means for investigating and qualifying fuels and materials needed for advanced reactor concepts. The testing environment includes a fast-flux neutron spectrum of sufficient intensity to perform accelerated irradiation testing. Appropriate irradiation temperature, gaseous environment, test volume, diagnostics, and access and handling features are also needed. This document serves to identify those requirements as well as generic requirements applicable to any system of this kind.

  17. Part V: Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DE-AC36-08GO28308 Modification M801 Section H - Page 2 of 50 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries...

  18. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    the system in support of Federal Personnel. 2. General Requirements 2.1 Capacity- The Web-Based Reporting System shall have the capacity to contain all documents, including task ...

  19. NaIrO{sub 3}-A pentavalent post-perovskite

    SciTech Connect (OSTI)

    Bremholm, M.; Dutton, S.E.; Stephens, P.W.; Cava, R.J.

    2011-03-15

    Sodium iridium (V) oxide, NaIrO{sub 3,} was synthesized by a high pressure solid state method and recovered to ambient conditions. It is found to be isostructural with CaIrO{sub 3}, the much-studied structural analog of the high-pressure post-perovskite phase of MgSiO{sub 3}. Among the oxide post-perovskites, NaIrO{sub 3} is the first example with a pentavalent cation. The structure consists of layers of corner- and edge-sharing IrO{sub 6} octahedra separated by layers of NaO{sub 8} bicapped trigonal prisms. NaIrO{sub 3} shows no magnetic ordering and resistivity measurements show non-metallic behavior. The crystal structure, electrical and magnetic properties are discussed and compared to known post-perovskites and pentavalent perovskite metal oxides. -- Graphical abstract: Sodium iridium(V) oxide, NaIrO{sub 3}, synthesized by a high pressure solid state method and recovered to ambient conditions is found to crystallize as the post-perovskite structure and is the first example of a pentavalent ABO{sub 3} post-perovskite. Research highlights: {yields} NaIrO{sub 3} post-perovskite stabilized by pressure. {yields} First example of a pentavalent oxide post-perovskite. {yields} Non-metallic and non-magnetic behavior of NaIrO{sub 3}.

  20. Requirements for CEC POP machine protection system

    SciTech Connect (OSTI)

    Pinayev, I.

    2015-02-18

    The requirements of CEC POP machine protection system are meant to prevent damage to a vacuum chamber by a missteered electron beam. In this example, beam energy = 22 MeV, Maximal bunch charge = 5 nC, Maximal repetition rate = 78 kHz, Normalized emittance = 5 mm mrad, Minimal β-function = 1 m. From this information the requirements of the protection system can be calculated by factoring the information into equations to find beam densities and temperature excursions.

  1. Training and Required Reading Management Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

  2. Present and Future Computing Requirements for PETSc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Future Computing Requirements for PETSc Jed Brown jedbrown@mcs.anl.gov Mathematics and Computer Science Division, Argonne National Laboratory Department of Computer Science, University of Colorado Boulder NERSC ASCR Requirements for 2017 2014-01-15 Extending PETSc's Hierarchically Nested Solvers ANL Lois C. McInnes, Barry Smith, Jed Brown, Satish Balay UChicago Matt Knepley IIT Hong Zhang LBL Mark Adams Linear solvers, nonlinear solvers, time integrators, optimization methods (merged TAO)

  3. Improving CSE Software through Reproducibility Requirements. (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Improving CSE Software through Reproducibility Requirements. Citation Details In-Document Search Title: Improving CSE Software through Reproducibility Requirements. Abstract not provided. Authors: Heroux, Michael Allen Publication Date: 2011-02-01 OSTI Identifier: 1109282 Report Number(s): SAND2011-1158C 471476 DOE Contract Number: AC04-94AL85000 Resource Type: Conference Resource Relation: Conference: 4th International Workshop on Software Engineering for Computational

  4. OUO Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OUO Review Requirement OUO Review Requirement Who can decide whether a document contains OUO information? In certain cases, the Office of Classification or your program office has already made the OUO decision for you. These decisions are found in classification guides, Unclassified Controlled Nuclear Information (UCNI) guidelines, or in program-issued OUO guidance. If a topic in such guidance indicates that information in your document is OUO, then the document contains OUO information. Some

  5. Determining Allocation Requirements | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Allocation Management Determining Allocation Requirements Querying Allocations Using cbank Mira/Cetus/Vesta Cooley Policies Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback Form] Determining Allocation Requirements Estimating CPU-Hours for ALCF Blue Gene/Q Systems When estimating CPU-hours for the ALCF Blue Gene/Q systems, it is important to take into consideration the unique aspects of the Blue Gene

  6. CRAD, Facility Safety - Unreviewed Safety Question Requirements |

    Office of Environmental Management (EM)

    Department of Energy Facility Safety - Unreviewed Safety Question Requirements CRAD, Facility Safety - Unreviewed Safety Question Requirements A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Unreviewed Safety Question (USQ) process.. CRADs provide a recommended approach and the types of information to

  7. JLab Registration/International Services - Training Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hosting Foreign Nationals Special Note for High School and Undergraduate Students Click Here All High School Studenta and Undergraduate students must also complete the Student Safety and Security Training prior to gaining access to work areas. This course cannot be taken online. Contact the Science Education Office (education@jlab.org) to schedule this training. Training Requirements In order to provide a safe and secure place to work, Jefferson Lab requires all individuals to complete training

  8. Hanford analytical services quality assurance requirements documents

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements applicable to each of the other three volumes and is intended to be used in conjunction with the technical volumes.

  9. Visitor Security Requirements | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visitor Security Requirements NOTE: These requirements do not apply to events held at the SREL Conference Center, which is located outside the security barricade. Before you arrive: I. Obtaining a visitor's badge II. Prohibited articles III. Electronics policy IV. Vehicle inspections When you arrive: Proceed to the badge office (map). Present two forms of identification from the list of acceptable documents, including one photo ID, to receive your badge. You will not receive a badge without

  10. Goals and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals and Requirements Goals and Requirements The U.S. Department of Energy's (DOE) Sustainability Performance Office (SPO) oversees Departmental compliance with goals outlined in Executive Order (E.O.) 13693, Planning for Sustainability in the Next Decade, and related statutes. Issued on March 19, 2015, E.O. 13693 revokes E.O.s 13514 and 13423, while setting reduction targets for energy use intensity, water use intensity, and greenhouse gas (GHG) emissions and prescribing other sustainability

  11. NBP RFI: Communications Requirements | Department of Energy

    Office of Environmental Management (EM)

    This paper has two objectives: 1) Define the need for dedicated wireless spectrum for Utilities. 2) Provide information to support Utilities' communication needs. PDF icon NBP RFI: Communications Requirements More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the

  12. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Energy Savers [EERE]

    b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable

  13. Post-closure permit application for the Kerr Hollow Quarry at the Y-12 plant

    SciTech Connect (OSTI)

    1995-06-01

    The Kerr Hollow Quarry (KHQ) is located on U.S. Department of Energy (DOE) property at the Y-12 Plant, Oak Ridge, Tennessee. The Oak Ridge Y-12 Plant was built by the U.S. Army Corps of Engineers in 1943 as part of the Manhattan Project. Until 1992, the primary mission of the Y-12 Plant was the production and fabrication of nuclear weapons components. Activities associated with these functions included production of lithium compounds, recovery of enriched uranium from scrap material, and fabrication of uranium and other materials into finished parts for assemblies. The Kerr Hollow Quarry was used for waste disposal of a variety of materials including water-reactive and shock-sensitive chemicals and compressed gas cylinders. These materials were packaged in various containers and sank under the water in the quarry due to their great weight. Disposal activities were terminated in November, 1988 due to a determination by the Tennessee Department of Environment and Conservation that the quarry was subject to regulations under the Resource Conservation and Recovery Act of 1993. Methods of closure for the quarry were reviewed, and actions were initiated to close the quarry in accordance with closure requirements for interim status surface impoundments specified in Tennessee Rules 1200-1-11-.05(7) and 1200-1-11-.05(11). As part of these actions, efforts were made to characterize the physical and chemical nature of wastes that had been disposed of in the quarry, and to remove any containers or debris that were put into the quarry during waste disposal activities. Closure certification reports (Fraser et al. 1993 and Dames and Moore 1993) document closure activities in detail. This report contains the post-closure permit application for the Kerr Hollow Quarry site.

  14. Interactive pre- and post-processing tools for finite-difference time-domain codes

    SciTech Connect (OSTI)

    Cabral, B.K.; Laguna, G.W.; McLeod, R.R.; Ray, S.L.; Pennock, S.T.; Berger, R.L.; Bland, M.F.

    1989-01-12

    Practical three-dimensional electromagnetic modeling has traditionally been hampered by insufficient computing power. Recent advances in computer hardware are beginning to remove this difficulty, and one can expect that this trend will continue for the foreseeable future. To exploit this increased computer power and to solve more realistic problems, researchers have developed numerous algorithms appropriate for 3-D calculations and have built large general-purpose computer codes around them. In spite of this technical and theoretical progress, two practical difficulties remain: providing the computer code with an accurate description of a particular problem and viewing the end results of the calculation. Researchers at the Lawrence Livermore National Laboratory have been developing and using a new finite-difference, time-domain (FDTD) code over the last few years. This code, TSAR, is currently being used on a wide range of electromagnetic scattering, coupling, and propagation problems. Some of the geometries of interest are large and quite detailed, requiring meshes with more than a million cells. To efficiently deal with these large problems, we have developed a set of pre and post-processing tools to be used in conjunction with the TSAR FDTD code. This set of utilities consists of a solid-model based mesh generator, a mesh verifier, and a color/surface plotter. These tools all run on graphics workstations and, due to their highly interactive nature, are quite easy to use. For added convenience, some of the workstations are connected to a videotape system. With this arrangement, users can record complex time-varying results in a convenient and portable format. We anticipate that the poster talk associated with this paper will include a videotape demonstration of these capabilities.

  15. Cyclotron Requirements for Multi-disciplinary Programs

    SciTech Connect (OSTI)

    Armbruster, John M.

    2009-03-10

    As time has passed, the various Cyclotron programs have changed over the years. In the ''early'' times of Cyclotron operations, the emphasis was on a more single sided approach such as Clinical or Research or Production. However, as time passed, the disciplines became more interconnected until today, it is unusual to have a Cyclotron and only have a single program unless it is pure production. More and more, especially in public areas such as Universities or Health Centers, you are seeing programs that do all three types of disciplines: Production; Clinical or Patient Diagnostics and/or Treatment; and Research, either in the development and manufacture of new Radio-Isotopes, new Diagnostic or Therapeutic Compound Development, or Clinical Research involving subject testing. While all three of these disciplines have some common requirements, they also have some very different requirements that may be completely counterproductive to other requirements. For a program where all three disciplines are required to be successful, it is necessary come up with some sort of compromise that meets all the various requirements. During this talk, we will try to identify some of these different requirements for the various disciplines and how these could impact the other disciplines. We will also discuss ideas for some possible compromises that might reduce the conflict between the various disciplines.

  16. LANL surveillance requirements management and surveillance requirements from NA-12 tasking memo

    SciTech Connect (OSTI)

    Hills, Charles R

    2011-01-25

    Surveillance briefing to NNSA to support a tasking memo from NA-12 on Surveillance requirements. This talk presents the process for developing surveillance requirements, discusses the LANL requirements that were issued as part of that tasking memo, and presents recommendations on Component Evaluation and Planning Committee activities for FY11.

  17. Progress Continues Post-Recovery Act Award at Hanford Site | Department of

    Office of Environmental Management (EM)

    Energy Progress Continues Post-Recovery Act Award at Hanford Site Progress Continues Post-Recovery Act Award at Hanford Site American Recovery and Reinvestment Act work at the Hanford site continues with several projects intended to reduce the Cold War cleanup footprint, from decommissioning a plant once associated with plutonium production to demolition of the last remaining structure at a reserve that had served as a buffer area for the U.S. Army. PDF icon Progress Continues Post-Recovery

  18. Post-Closure Benefits: DOE Complex vs Closure Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Post-Closure Benefits » Post-Closure Benefits: DOE Complex vs Closure Sites Post-Closure Benefits: DOE Complex vs Closure Sites Status of Contractor Pension and PRB Benefit Programs - September 30, 2013 DOE Wide Closure Sites Defined Benefit Pension Plans 36 6 Defined Contribution Plans 13 0 PRB Plans >100 7 Active Participants 61,400 0 Retirees/Survivors 75,300 6,400 Terminated Vested Participants 39,500 2,900 FY 2013 Pension Unfunded Liability 10,616 Million 0 Million FY 2013 PRB Unfunded

  19. Demonstration Assessment of Light-Emitting Diode (LED) Post-Top Lighting at

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Central Park in New York City (Technical Report) | SciTech Connect Demonstration Assessment of Light-Emitting Diode (LED) Post-Top Lighting at Central Park in New York City Citation Details In-Document Search Title: Demonstration Assessment of Light-Emitting Diode (LED) Post-Top Lighting at Central Park in New York City A review of five post-top light-emitting diode (LED) pedestrian luminaires installed in New York City's Central Park for possible replacement to the existing metal halide

  20. In Case You Missed Them: Our Top Blog Posts from December | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy In Case You Missed Them: Our Top Blog Posts from December In Case You Missed Them: Our Top Blog Posts from December January 7, 2016 - 8:42am Addthis In Case You Missed Them: Our Top Blog Posts from December Drew Bittner Writer/Editor, Office of Energy Efficiency and Renewable Energy Happy New Year to our EERE Blog readers! How did January get here so quickly? It seems like only yesterday the kids were dressing up for Halloween, and we were buying turkey for Thanksgiving. The holiday