Powered by Deep Web Technologies
Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Enhanced E1 transitions and {alpha}-clustering in {sup 212}Po  

SciTech Connect

An {alpha}+{sup 208}Pb(0{sup +},3{sup -}) cluster model explains the recently observed enhanced E1 transitions from the new negative-parity levels to the yrast states in {sup 212}Po. Heavy and light nuclei present good examples of surface clustering and well-localized clustering.

Suzuki, Y. [Department of Physics, Niigata University, Niigata 950-2181 (Japan); Ohkubo, S. [Department of Applied Science and Environment, Kochi Women's University, Kochi 780-8515 (Japan)

2011-05-06T23:59:59.000Z

2

Functions and Requirements for the Transition Project  

SciTech Connect

This document describes the functional requirement baseline for the Transition of 100 K Area Facilities Project (Transition Project). This baseline information consists of top-level functions, requirements, concept description, interface description, issues, and enabling assumptions.

YANOCHKO, R.M.

2000-04-24T23:59:59.000Z

3

Transition of Long-Term Response Action Management Requirements  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this memorandum is to provide you with additional guidance for planning the transition of long-term response action management requirements to receiving Program Secretarial Offices ...

4

Stockpile Transition Enabling Program (STEP): Process and project requirements  

Science Conference Proceedings (OSTI)

The Stockpile Transition Enabling Program (STEP) is aimed at identifying weapon components suitable for use in more than one weapon and for qualifying components so identified for multiple use. Work includes identifying the means to maintain the manufacturing capability for these items. This document provides the participants in STEP a common, consistent understanding of the process and requirements. The STEP objectives are presented and the activities are outlined. The STEP project selections are based on the customer needs, product applicability, and maturity of the technology used. A formal project selection process is described and the selection criteria are defined. The concept of {open_quotes}production readiness{close_quotes} is introduced, along with a summary of the project requirements and deliverables to demonstrate production readiness.

Ma, Kwok Kee

1993-06-01T23:59:59.000Z

5

A Large-scale Relativistic Configuration-interaction Approach: Application to the 4s2 - 4s4p Transition Energies and E1 Rates for Zn-like Ions  

SciTech Connect

Relativistic configuration-interaction calculations of the 4s4p excitation energies and 4s{sup 2} - 4s4p E1 transitions for Zn-like ions from Z = 30 to 92 are shown. B-spline basis functions are used for these large-scale calculations. QED corrections to the excitation energies are also calculated. Results are in good agreement with other theories and with experiment, and demonstrate the utility of this method for high-precision atomic structure calculations not just for few-electron systems but also for large atomic systems such as Zn-like ions along the entire isoelectronic sequence.

Chen, M H; Cheng, K T

2009-08-28T23:59:59.000Z

6

table E1  

U.S. Energy Information Administration (EIA)

AC Argentina AR Aruba AA Bahamas, The BF Barbados BB Belize BH Bolivia BL ... Table E.1 World Primary Energy Consumption (Btu), 1980-2006 (Quadrillion (10 15 ) Btu) Page

7

Analysis of the Transition to Hydrogen Fuel Cell Vehicles and the Potential Hydrogen Energy Infrastructure Requirements, March 2008  

Fuel Cell Technologies Publication and Product Library (EERE)

Achieving a successful transition to hydrogen-powered vehicles in the U.S. automotive market will require strong and sustained commitment by hydrogen producers, vehicle manufacturers, transporters and

8

An early function of the adenoviral E1B 55 kDa protein is required for the nuclear relocalization of the cellular p53 protein in adenovirus-infected normal human cells  

Science Conference Proceedings (OSTI)

It is well established that the human subgroup C adenovirus type 5 (Ad5) E1B 55 kDa protein can regulate the activity and concentration of the cellular tumor suppressor, p53. However, the contribution(s) of these functions of the E1B protein to viral reproduction remains unclear. To investigate this issue, we examined properties of p53 in normal human cells infected by E1B mutant viruses that display defective entry into the late phase or viral late mRNA export. The steady-state concentrations of p53 were significantly higher in cells infected by the E1B 55 kDa null mutant Hr6 or three mutants carrying small insertions in the E1B 55 kDa protein coding sequence than in Ad5-infected cells. Nevertheless, none of the mutants induced apoptosis in infected cells. Rather, the localization of p53 to E1B containing nuclear sites observed during infection by Ad5 was prevented by mutations that impair interaction of the E1B protein with p53 and/or with the E4 Orf6 protein. These results indicate that the E1B protein fulfills an early function that correlates efficient entry into the late phase with the localization of E1B and p53 in the nucleus of Ad5-infected normal human cells.

Cardoso, F.M. [Departamento de Bioquimica y Biologia Molecular, Facultad de Ciencias, Universidad Autonoma del Estado de Morelos, Cuernavaca 62209 (Mexico); Kato, Sayuri E.M.; Huang Wenying; Flint, S. Jane [Department of Molecular Biology, Princeton University, Princeton, NJ 08544 (United States); Gonzalez, Ramon A. [Departamento de Bioquimica y Biologia Molecular, Facultad de Ciencias, Universidad Autonoma del Estado de Morelos, Cuernavaca 62209 (Mexico)], E-mail: rgonzalez@uaem.mx

2008-09-01T23:59:59.000Z

9

The transition to hydrogen as a transportation fuel: Costs and infrastructure requirements  

DOE Green Energy (OSTI)

Hydrogen fuel, used in an internal combustion engine optimized for maximum efficiency and as part of a hybrid-electric vehicle, will give excellent performance and range with emissions below one-tenth the ultra-low emission vehicle standards being considered in California as Equivalent Zero Emission Vehicles. These vehicles can also be manufactured with increased but not excessive cost. Hydrogen-fueled engines have demonstrated indicated efficiencies of more than 50% under lean operation. Combining optimized engines and other advanced components, the overall vehicle efficiency should approach 40%, compared with 13% for a conventional vehicle in the urban driving cycle. The optimized engine-generator unit is the mechanical equivalent of the fuel cell but at a cost competitive with today`s engines. The increased efficiency of hybrid-electric vehicles now makes hydrogen fuel competitive with today`s conventional vehicles. Conservative analysis of the infrastructure options to support a transition to a hydrogen-fueled light-duty fleet indicates that hydrogen may be utilized at a total cost comparable to the 3.1 cents/km U.S. vehicle operators pay today while using conventional automobiles. Both on-site production by electrolysis or reforming of natural gas and liquid hydrogen distribution offer the possibility of a smooth transition by taking advantage of existing large-scale energy infrastructures. Eventually, renewable sources of electricity and scalable methods of making hydrogen will have lower costs than today. With a hybrid-electric propulsion system, the infrastructure to supply hydrogen and the vehicles to use it can be developed today and thus be in place when fuel cells become economical for vehicle use.

Schock, R.N.; Berry, G.D.; Ramback, G.D.; Smith, J.R.

1996-03-20T23:59:59.000Z

10

Gene coding for the E1 endoglucanase  

DOE Patents (OSTI)

The gene encoding Acidothermus cellulolyticus E1 endoglucanase is cloned and expressed in heterologous microorganisms. A new modified E1 endoglucanase enzyme is produced along with variants of the gene and enzyme. The E1 endoglucanase is useful for hydrolyzing cellulose to sugars for simultaneous or later fermentation into alcohol. 6 figs.

Thomas, S.R.; Laymon, R.A.; Himmel, M.E.

1996-07-16T23:59:59.000Z

11

Energy intensity (Table E.1g)  

U.S. Energy Information Administration (EIA)

AC Argentina AR Aruba AA Bahamas, The BF Barbados BB Belize BH Bolivia BL ... E.1g World Energy Intensity--Total Primary Energy Consumption per Dollar of Gross Domestic

12

Hydrogen Scenario Analysis Summary Report: Analysis of the Transition to Hydrogen Fuel Cell Vehicles and the Potential Hydrogen Energy Infrastructure Requirements  

SciTech Connect

Achieving a successful transition to hydrogen-powered vehicles in the U.S. automotive market will require strong and sustained commitment by hydrogen producers, vehicle manufacturers, transporters and retailers, consumers, and governments. The interaction of these agents in the marketplace will determine the real costs and benefits of early market transformation policies, and ultimately the success of the transition itself. The transition to hydrogen-powered transportation faces imposing economic barriers. The challenges include developing and refining a new and different power-train technology, building a supporting fuel infrastructure, creating a market for new and unfamiliar vehicles, and achieving economies of scale in vehicle production while providing an attractive selection of vehicle makes and models for car-buyers. The upfront costs will be high and could persist for a decade or more, delaying profitability until an adequate number of vehicles can be produced and moved into consumer markets. However, the potential rewards to the economy, environment, and national security are immense. Such a profound market transformation will require careful planning and strong, consistent policy incentives. Section 811 of the Energy Policy Act (EPACT) of 2005, Public Law 109-59 (U.S. House, 2005), calls for a report from the Secretary of Energy on measures to support the transition to a hydrogen economy. The report was to specifically address production and deployment of hydrogen-fueled vehicles and the hydrogen production and delivery infrastructure needed to support those vehicles. In addition, the 2004 report of the National Academy of Sciences (NAS, 2004), The Hydrogen Economy, contained two recommendations for analyses to be conducted by the U.S. Department of Energy (DOE) to strengthen hydrogen energy transition and infrastructure planning for the hydrogen economy. In response to the EPACT requirement and NAS recommendations, DOE's Hydrogen, Fuel Cells and Infrastructure Technologies Program (HFCIT) has supported a series of analyses to evaluate alternative scenarios for deployment of millions of hydrogen fueled vehicles and supporting infrastructure. To ensure that these alternative market penetration scenarios took into consideration the thinking of the automobile manufacturers, energy companies, industrial hydrogen suppliers, and others from the private sector, DOE held several stakeholder meetings to explain the analyses, describe the models, and solicit comments about the methods, assumptions, and preliminary results (U.S. DOE, 2006a). The first stakeholder meeting was held on January 26, 2006, to solicit guidance during the initial phases of the analysis; this was followed by a second meeting on August 9-10, 2006, to review the preliminary results. A third and final meeting was held on January 31, 2007, to discuss the final analysis results. More than 60 hydrogen energy experts from industry, government, national laboratories, and universities attended these meetings and provided their comments to help guide DOE's analysis. The final scenarios attempt to reflect the collective judgment of the participants in these meetings. However, they should not be interpreted as having been explicitly endorsed by DOE or any of the stakeholders participating. The DOE analysis examined three vehicle penetration scenarios: Scenario 1--Production of thousands of vehicles per year by 2015 and hundreds of thousands per year by 2019. This option is expected to lead to a market penetration of 2.0 million fuel cell vehicles (FCV) by 2025. Scenario 2--Production of thousands of FCVs by 2013 and hundreds of thousands by 2018. This option is expected to lead to a market penetration of 5.0 million FCVs by 2025. Scenario 3--Production of thousands of FCVs by 2013, hundreds of thousands by 2018, and millions by 2021 such that market penetration is 10 million by 2025. Scenario 3 was formulated to comply with the NAS recommendation: 'DOE should map out and evaluate a transition plan consistent with developing the infrastructure a

Greene, David L [ORNL; Leiby, Paul Newsome [ORNL; James, Brian [Directed Technologies, Inc.; Perez, Julie [Directed Technologies, Inc.; Melendez, Margo [National Renewable Energy Laboratory (NREL); Milbrandt, Anelia [National Renewable Energy Laboratory (NREL); Unnasch, Stefan [Life Cycle Associates; Rutherford, Daniel [TIAX, LLC; Hooks, Matthew [TIAX, LLC

2008-03-01T23:59:59.000Z

13

Hydrogen Scenario Analysis Summary Report: Analysis of the Transition to Hydrogen Fuel Cell Vehicles and the Potential Hydrogen Energy Infrastructure Requirements  

DOE Green Energy (OSTI)

Achieving a successful transition to hydrogen-powered vehicles in the U.S. automotive market will require strong and sustained commitment by hydrogen producers, vehicle manufacturers, transporters and retailers, consumers, and governments. The interaction of these agents in the marketplace will determine the real costs and benefits of early market transformation policies, and ultimately the success of the transition itself. The transition to hydrogen-powered transportation faces imposing economic barriers. The challenges include developing and refining a new and different power-train technology, building a supporting fuel infrastructure, creating a market for new and unfamiliar vehicles, and achieving economies of scale in vehicle production while providing an attractive selection of vehicle makes and models for car-buyers. The upfront costs will be high and could persist for a decade or more, delaying profitability until an adequate number of vehicles can be produced and moved into consumer markets. However, the potential rewards to the economy, environment, and national security are immense. Such a profound market transformation will require careful planning and strong, consistent policy incentives. Section 811 of the Energy Policy Act (EPACT) of 2005, Public Law 109-59 (U.S. House, 2005), calls for a report from the Secretary of Energy on measures to support the transition to a hydrogen economy. The report was to specifically address production and deployment of hydrogen-fueled vehicles and the hydrogen production and delivery infrastructure needed to support those vehicles. In addition, the 2004 report of the National Academy of Sciences (NAS, 2004), The Hydrogen Economy, contained two recommendations for analyses to be conducted by the U.S. Department of Energy (DOE) to strengthen hydrogen energy transition and infrastructure planning for the hydrogen economy. In response to the EPACT requirement and NAS recommendations, DOE's Hydrogen, Fuel Cells and Infrastructure Technologies Program (HFCIT) has supported a series of analyses to evaluate alternative scenarios for deployment of millions of hydrogen fueled vehicles and supporting infrastructure. To ensure that these alternative market penetration scenarios took into consideration the thinking of the automobile manufacturers, energy companies, industrial hydrogen suppliers, and others from the private sector, DOE held several stakeholder meetings to explain the analyses, describe the models, and solicit comments about the methods, assumptions, and preliminary results (U.S. DOE, 2006a). The first stakeholder meeting was held on January 26, 2006, to solicit guidance during the initial phases of the analysis; this was followed by a second meeting on August 9-10, 2006, to review the preliminary results. A third and final meeting was held on January 31, 2007, to discuss the final analysis results. More than 60 hydrogen energy experts from industry, government, national laboratories, and universities attended these meetings and provided their comments to help guide DOE's analysis. The final scenarios attempt to reflect the collective judgment of the participants in these meetings. However, they should not be interpreted as having been explicitly endorsed by DOE or any of the stakeholders participating. The DOE analysis examined three vehicle penetration scenarios: Scenario 1--Production of thousands of vehicles per year by 2015 and hundreds of thousands per year by 2019. This option is expected to lead to a market penetration of 2.0 million fuel cell vehicles (FCV) by 2025. Scenario 2--Production of thousands of FCVs by 2013 and hundreds of thousands by 2018. This option is expected to lead to a market penetration of 5.0 million FCVs by 2025. Scenario 3--Production of thousands of FCVs by 2013, hundreds of thousands by 2018, and millions by 2021 such that market penetration is 10 million by 2025. Scenario 3 was formulated to comply with the NAS recommendation: 'DOE should map out and evaluate a transition plan consistent with developing the infrastructure and hydrogen res

Greene, David L [ORNL; Leiby, Paul Newsome [ORNL; James, Brian [Directed Technologies, Inc.; Perez, Julie [Directed Technologies, Inc.; Melendez, Margo [National Renewable Energy Laboratory (NREL); Milbrandt, Anelia [National Renewable Energy Laboratory (NREL); Unnasch, Stefan [Life Cycle Associates; Rutherford, Daniel [TIAX, LLC; Hooks, Matthew [TIAX, LLC

2008-03-01T23:59:59.000Z

14

Data:0318c2f2-e1f7-453c-b78d-7be37aca21e1 | Open Energy Information  

Open Energy Info (EERE)

c2f2-e1f7-453c-b78d-7be37aca21e1 c2f2-e1f7-453c-b78d-7be37aca21e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 1 - Residential Sector: Residential Description: Available to members of the Cooperative for requiring a single-phase service, subject to the Cooperative's established rules and regulations. Service under this Schedule #0001 is limited to installations requiring 50 KVA or less of transformer capacity and the starting current of the largest motor does not exceed 260 amperes. Source or reference: www.cceci.com

15

Table E1. Estimated Primary Energy Consumption in the United ...  

U.S. Energy Information Administration (EIA)

Table E1. Estimated Primary Energy Consumption in the United States, Selected Years, 1635-1945 (Quadrillion Btu) Year: Fossil Fuels

16

Characterization of papillomavirus E1 helicase mutants defective for interaction with the SUMO-conjugating enzyme Ubc9  

Science Conference Proceedings (OSTI)

The E1 helicase from BPV and HPV16 interacts with Ubc9 to facilitate viral genome replication. We report that HPV11 E1 also interacts with Ubc9 in vitro and in the yeast two-hybrid system. Residues in E1 involved in oligomerization (353-435) were sufficient for binding to Ubc9 in vitro, but the origin-binding and ATPase domains were additionally required in yeast. Nuclear accumulation of BPV E1 was shown previously to depend on its interaction with Ubc9 and sumoylation on lysine 514. In contrast, HPV11 and HPV16 E1 mutants defective for Ubc9 binding remained nuclear even when the SUMO pathway was inhibited. Furthermore, we found that K514 in BPV E1 and the analogous K559 in HPV11 E1 are not essential for nuclear accumulation of E1. These results suggest that the interaction of E1 with Ubc9 is not essential for its nuclear accumulation but, rather, depends on its oligomerization and binding to DNA and ATP.

Fradet-Turcotte, Amelie [Laboratory of Molecular Virology, Institut de Recherches Cliniques de Montreal and Department of Biochemistry, University of Montreal, 110 Pine Avenue West, Montreal, Quebec, H2W 1R7 (Canada); Brault, Karine; Titolo, Steve [Department of Biological Sciences, Boehringer Ingelheim (Canada) Ltd., Laval, Quebec, H7S 2G5 (Canada); Howley, Peter M. [Department of Pathology, Harvard Medical School, 77 Avenue Louis Pasteur, Boston, MA 02115 (United States); Archambault, Jacques, E-mail: jacques.archambault@ircm.qc.c [Laboratory of Molecular Virology, Institut de Recherches Cliniques de Montreal and Department of Biochemistry, University of Montreal, 110 Pine Avenue West, Montreal, Quebec, H2W 1R7 (Canada)

2009-12-20T23:59:59.000Z

17

"RSE Table E1.1. Relative Standard Errors for Table E1.1;"  

U.S. Energy Information Administration (EIA) Indexed Site

.1. Relative Standard Errors for Table E1.1;" .1. Relative Standard Errors for Table E1.1;" " Unit: Percents." " "," "," "," "," "," "," "," "," "," " " "," ",," "," ",," "," ",," ","Shipments" "Economic",,"Net","Residual","Distillate",,"LPG and",,"Coke and"," ","of Energy Sources" "Characteristic(a)","Total(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Natural Gas(e)","NGL(f)","Coal","Breeze","Other(g)","Produced Onsite(h)"

18

New energy technologies, new requirements on electricity and an unresolved transition problem towards sustainability: Is there need for basic academic research  

E-Print Network (OSTI)

The recent changes in the electricity sector have generated a large range of new requirements not only on the electric but also on other energy infrastructures. The authors of this article identify the lack of theoretical knowledge for an integrated, technology-based assessment for possible future system arrangements, and show which type of method can be chosen to overcome it. The paper illustrates the usefulness of integrated inspection of all relevant energy systems within a certain area and highly simplified load flow calculation methods. A related research project is introduced, the basic assumptions and premises of which are explained.

B Klöckl; K Fröhlich; K Kaltenegger

2005-01-01T23:59:59.000Z

19

C&E/E'1A-0466(88)  

Gasoline and Diesel Fuel Update (EIA)

C&E/E'1A-0466(88) C&E/E'1A-0466(88) Profiles of Foreign Direct Investment in U.S. Energy 1988 Contacts Profiles of Foreign Direct Investment in U.S. Energy 1988 was prepared in the Macro and Financial Information Branch, Economics and Statistics Division, Office of Energy Markets and End Use, Energy Information Ad ministration, U.S. Department of Energy, under the direction of Arthur T. Andersen (202) 586-1441 and Mary E. Northup (202) 586-1445. Specific information concerning the preparation of this document may be obtained from Jon A. Rasmussen (202) 586-1449. This publication is available from the Superintendent of Documents, U.S. Government Printing Office (GPO). Information about purchasing this or other Energy Information Administration (EIA) publications

20

MHK Technologies/Evopod E1 | Open Energy Information  

Open Energy Info (EERE)

< MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Evopod E1.jpg Technology Profile Primary Organization Oceanflow Energy Ltd Project(s) where this technology is utilized *MHK Projects/Evopod E1 1 10 scale grid connected demonstrator Technology Resource Click here Current/Tidal Technology Type Click here Axial Flow Turbine Technology Readiness Level Click here TRL 7/8: Open Water System Testing & Demonstration & Operation Technology Description The Evopod E1 is a 1 10th scale 1kW tidal turbine prototype that is being operated by Oceanflow Energy in Strangford Lough Northern Ireland The projects main aims are to show proof of the technical solutions inherant in the technology take record of it s operational reliability and monitor the environmental impact of the unique device The project has received backing through the award of two UK R D grant awards and academic studies have been carried out in collaboration with several Universities The project has won several awards

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Nuclear vorticity in isoscalar E1 modes: Skyrme-RPA analysis  

E-Print Network (OSTI)

Two basic concepts of nuclear vorticity, hydrodynamical (HD) and Rawenthall-Wambach (RW), are critically inspected. As a test case, we consider the interplay of irrotational and vortical motion in isoscalar electric dipole E1(T=0) modes in $^{208}$Pb, namely the toroidal and compression modes. The modes are described in a self-consistent random-phase-approximation (RPA) with the Skyrme force SLy6. They are examined in terms of strength functions, transition densities, current fields, and formfactors. It is shown that the RW conception (suggesting the upper component of the nuclear current as the vorticity indicator) is not robust. The HD vorticity is not easily applicable either because the definition of a velocity field is too involved in nuclear systems. Instead, the vorticity is better characterized by the toroidal strength which closely corresponds to HD treatment and is approximately decoupled from the continuity equation.

P. -G. Reinhard; V. O. Nesterenko; A. Repko; J. Kvasil

2013-12-27T23:59:59.000Z

22

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

23

Human papillomavirus 16 E2 stability and transcriptional activation is enhanced by E1 via a direct protein-protein interaction  

Science Conference Proceedings (OSTI)

Human papillomavirus 16 E1 and E2 interact with cellular factors to replicate the viral genome. E2 forms homodimers and binds to 12 bp palindromic sequences adjacent to the viral origin and recruits E1 to the origin. E1 forms a di-hexameric helicase complex that replicates the viral genome. This manuscript demonstrates that E1 stabilises the E2 protein, increasing the half life in both C33a and 293 T cells respectively. This stabilisation requires a direct protein--protein interaction. In addition, the E1 protein enhances E2 transcription function in a manner that suggests the E1 protein itself can contribute to transcriptional regulation not simply by E2 stabilisation but by direct stimulation of transcription. This activation of E2 transcription is again dependent upon an interaction with E1. Overall the results suggest that in the viral life cycle, co-expression of E1 with E2 can increase E2 stability and enhance E2 function.

King, Lauren E.; Dornan, Edward S.; Donaldson, Mary M.; Morgan, Iain M., E-mail: Iain.Morgan@gla.ac.u

2011-05-25T23:59:59.000Z

24

Data:B867feb4-c3b5-449e-a0e1-75483a91e1f0 | Open Energy Information  

Open Energy Info (EERE)

7feb4-c3b5-449e-a0e1-75483a91e1f0 7feb4-c3b5-449e-a0e1-75483a91e1f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coahoma Electric Power Assn Effective date: 2009/01/31 End date if known: Rate name: 13 - Large Commercial Service Sector: Commercial Description: Available to commercial and industrial service requiring between 50 kVA and 499 kVA of transformer capacity. Single phase and three phase at available secondary voltages. Motors having a rate capacity of 10 HP must three phase. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW)

25

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

26

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

27

Data:B2356495-e1fc-4ae9-852f-3206095b59dc | Open Energy Information  

Open Energy Info (EERE)

-e1fc-4ae9-852f-3206095b59dc -e1fc-4ae9-852f-3206095b59dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: SCHEDULE 17 - SALES FOR RESALE - BLEND RATES Sector: Commercial Description: summer is defined jun 15th to Oct 15th. Available to a municipality for resale which has agreed to purchase 100% of firm requirements from Norris and has not exercised its right to purchase WAPA Class I Firm Power directly from WAPA. Source or reference: http://www.norrisppd.com/downloads/Schedule%2017%20-%20Sales%20and%20Resale%20-%20Blend%20Rates.pdf

28

Data:48486052-19e2-4116-879f-89e1d415d658 | Open Energy Information  

Open Energy Info (EERE)

52-19e2-4116-879f-89e1d415d658 52-19e2-4116-879f-89e1d415d658 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipmont Rural Elec Member Corp Effective date: End date if known: Rate name: SCHEDULE 9:LARGE POWER SERVICE(1,000 KW OR MORE) Sector: Description: Available to any member of Tipmont Rural Electric Membership Corporation (REMC) for large power service with a demand of 1,000 kW or more and is located adjacent to a substation, transmission line or distribution line of the REMC that is adequate and suitable for supplying required service. This schedule is not available for supplemental or standby service.

29

Data:9246541e-95de-42e1-8814-652b074c3ce4 | Open Energy Information  

Open Energy Info (EERE)

1e-95de-42e1-8814-652b074c3ce4 1e-95de-42e1-8814-652b074c3ce4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Municipal Sector: Commercial Description: At any point on BCLP's interconnected system where there are facilities of appropriate voltage and adequate capacity. This schedule is only for Bountiful City municipal accounts, and is for alternating current, single-phase or three-phase electric service, supplied at approximately 120 or 240 volts on an unmetered basis at a single point of delivery for all electric service required for municipal purposes as determined by BCLP.

30

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

31

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

32

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

33

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

34

Data:A804fbaf-6c7f-420a-97e1-eb57e9ffa2e1 | Open Energy Information  

Open Energy Info (EERE)

A804fbaf-6c7f-420a-97e1-eb57e9ffa2e1 A804fbaf-6c7f-420a-97e1-eb57e9ffa2e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (250W MH Directional Flood Lighting on existing 38 ft. steel Pole- Underground Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

35

Data:2999967e-1bbf-4a0c-b8bd-b13abaa464e1 | Open Energy Information  

Open Energy Info (EERE)

99967e-1bbf-4a0c-b8bd-b13abaa464e1 99967e-1bbf-4a0c-b8bd-b13abaa464e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pitt & Greene Elec Member Corp Effective date: End date if known: Rate name: Seasonal Service-Single Phase Sector: Commercial Description: Service under this schedule is available in all territory served by the cooperative subject to the cooperative's established service rules and regulations. Bills rendered June 1st through November 30th is applicable to all members desiring a service who will use 75% of total annual kWh and having atleast a 5 HP or 5 KW connected load.

36

Data:Ad350dce-67b2-4521-8b05-e1e1c4584201 | Open Energy Information  

Open Energy Info (EERE)

dce-67b2-4521-8b05-e1e1c4584201 dce-67b2-4521-8b05-e1e1c4584201 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Private Street and Area Lighting (PSL-10) metered HPS 1000W Sector: Lighting Description: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

37

Transit administration and planning research  

SciTech Connect

The 10 papers in the report deal with the following areas: Evaluation of demand-management strategies for Toledo's year 2010 transportation plan; Accommodating deaf and hard-of-hearing persons on public transportation systems in Massachusetts; Quick approach to compare highway and bus transit alternatives using the arterial analysis package; Panel survey approach to measuring transit route service elasticity of demand; UMTA and major investments: evaluation process and results; Using early performance to project transit route ridership: comparison of methods; Institutional requirements for competition: labor issues; Updating ride checks with multiple point checks; Producing section 15 service-consumed data: challenge for large transit; Parkrose targeted marketing campaign pass-incentive program.

de Corla-Souza; Gupta.

1989-01-01T23:59:59.000Z

38

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

39

site_transition.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legacy Legacy Management U.S. DEPARTMENT OF This fact sheet explains the process for transferring a site to the U.S. Department of Energy Office of Legacy Management. Site Transition Process Upon Cleanup Completion Introduction Transition Process After environmental remediation is completed at a site and there is no continuing mission, responsibility for the site and the associated records are transferred to the U.S. Department of Energy (DOE) Office of Legacy Management for post-closure management. Where residual hazards (e.g., disposal cells, ground water contamination) remain, active long-term surveillance and maintenance will be required to ensure protection of human health and the environment. The DOE Office of Legacy Management (LM) established transition guidance for remediated sites that will transfer to LM for long-term surveillance and maintenance. The

40

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The Search for the CP-violating emission of an E1 photon from the K(L) ---> pi+ pi- gamma decay  

SciTech Connect

A search for the CP-violating electric dipole (E1) direct emission contribution to the K{sub L} {yields} {pi}{sup +}{pi}{sup -}{gamma} decay is performed using data from the 1997 KTeV/E832 experiment. Because the K{sub L} {yields} {pi}{sup +}{pi}{sup -}{gamma} decay mode is massively dominated by the CP-violating inner bremsstrahlung (IB) and the CP-conserving magnetic dipole (M1) direct emission processes, previous analyses have neglected the E1 contribution. Therefore, this measurement is the first attempt to directly quantify the size of the E1 decay process. This E1 transition is one of the very few CP-violating processes that is accessible to experiment and, in principle, will produce new insights into the structure of the neutral kaon. The result of this analysis is that the E1 contribution is below the threshold of sensitivity, and therefore an upper bound of |g{sub E1}| < 0.14 (90% CL) is reported. In the process of obtaining this upper limit, high resolution measurements of fit parameters ({tilde g}{sub M1} and a{sub 1}/a{sub 2}) associated with the size and shape of the M1 direct emission peak are also extracted. The fit results for these parameters: {tilde g}{sub M1} = 1.229 {+-} 0.035 (stat) {+-} 0.087 (syst); a{sub 1}/a{sub 2} = -0.733 {+-} 0.007 (stat) {+-} 0.014 (syst) are in strong agreement with previous measurements.

Shields, John Michael; /Virginia U.

2005-01-01T23:59:59.000Z

42

Data:F3901e1d-e956-4224-930f-2e9b00f4e1a7 | Open Energy Information  

Open Energy Info (EERE)

e1d-e956-4224-930f-2e9b00f4e1a7 e1d-e956-4224-930f-2e9b00f4e1a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 03M - Multiple-Phase Power Less than 100 kVA or 100 kW Demand Sector: Commercial Description: Available to members of the Cooperative for commercial, industrial, non-residential/farm and other small users located on or near the Cooperative's three-phase lines where the transformer capacity does not exceed 100 KVA, or 100 KW of demand, subject to the rules, regulations and rates as established or as may from time to time be adopted by the Seller.

43

Data:Ce597e1f-a38e-4f7c-9eeb-6e1cfd25983a | Open Energy Information  

Open Energy Info (EERE)

e1f-a38e-4f7c-9eeb-6e1cfd25983a e1f-a38e-4f7c-9eeb-6e1cfd25983a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

44

Data:A3ab2293-5178-4cb7-95a0-e1e1b4625c86 | Open Energy Information  

Open Energy Info (EERE)

293-5178-4cb7-95a0-e1e1b4625c86 293-5178-4cb7-95a0-e1e1b4625c86 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

45

SUBSIDY ENERGY EMPLOYEES TRANSIT (SEET)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUBSIDY ENERGY EMPLOYEES TRANSIT (SEET) SUBSIDY ENERGY EMPLOYEES TRANSIT (SEET) Decrease in the Transit Subsidy Per The American Taxpayer Relief Act of 2012, the maximum amount for the Transit Subsidy is due to decrease from $245 to $130 a month. This change is scheduled to take effect on January 1, 2014. Outlined below are actions that you must take to purchase your fare for January 2014. SmarTrip less than $130.00 Per Month No Action Required SmarTrip greater than $130.00 Per Month Action Required SmarTrip Participants The new amount of $130 will post to your Smart Benefits account the first time you touch your card to a SmarTrip target in January 2014. You must ensure that there is money in your personal account. Metro will deduct fare from your personal account once the Smart Benefits

46

Data:92948548-49bb-4e1f-8c25-27cbbda752fa | Open Energy Information  

Open Energy Info (EERE)

548-49bb-4e1f-8c25-27cbbda752fa 548-49bb-4e1f-8c25-27cbbda752fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2013/01/01 End date if known: Rate name: Rate LPT Sector: Description: Availability: Service under this rate is optional for all requirements on a Customer's Premises, subject to availability and installation of metering equipment. Character of Service: Service is alternating current, nominally 60 cycles, three phase, in accordance with the Company's Requirements for Electric Service. Service will ordinarily be measured through a single meter at a primary voltage. In cases where service is measured at secondary voltage, the kilowatt-hours metered will be increased 3% for billing purposes.

47

EERE PROJECT MANAGEMENT CENTER Nl'PA D:E1'ERJvllNATION RECIPIENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

s DEP . .Rnn:NT OF ENERGY EERE PROJECT MANAGEMENT CENTER Nl'PA D:E1'ERJvllNATION RECIPIENT:Terralog Technologies USA Inc Page I of2 STATE: CA PROJECT TITLE: Advanced Horizontal...

48

Electric dipole transitions in pNRQCD  

E-Print Network (OSTI)

We present a theroretical treatment of electric dipole (E1) transitions of heavy quarkonia based on effective field theories. Within the framework of potential nonrelativistic QCD (pNRQCD) we derive the complete set of relativistic corrections at relative order $v^2$ to the decay rate in a systematic, model-independent way. Former results from potential model calculations will be scrutinized and a phenomenological analysis with lattice input in relation to experimental data will be presented.

Piotr Pietrulewicz

2013-01-07T23:59:59.000Z

49

Data:1d70695f-72e1-4bae-8b33-23e1e473a2a7 | Open Energy Information  

Open Energy Info (EERE)

5f-72e1-4bae-8b33-23e1e473a2a7 5f-72e1-4bae-8b33-23e1e473a2a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/06/01 End date if known: Rate name: Rate Adjustment Mechanism Provision Sector: Description: Purpose This mechanism is subject to review and continuation, termination or modification in the utility's next base rate case proceeding, upon a showing by the utility and finding by the Commission that continuation or modification is appropriate. As part of its submitted testimony in the base rate case, the Company will include a summary report of the status of certain HCEI initiatives. The RAM mechanism is designed to determine the change in annual utility base revenue levels, recognizing certain estimated changes in the utility's cost to provide service. If, through the application of this mechanism, it is determined that annual utility base revenues should be decreased or increased, then the RAM Revenue Adjustment will be applied within the Revenue Balancing Account Provision. The RAM Revenue Adjustment established for a RAM Period calendar year that is also a rate case test year shall terminate on the effective date of tariff rates that are implemented pursuant to a Commission Decision & Order for that test year, unless otherwise specified below.

50

Data:86569193-360e-4643-9a4c-99f318741e1e | Open Energy Information  

Open Energy Info (EERE)

9193-360e-4643-9a4c-99f318741e1e 9193-360e-4643-9a4c-99f318741e1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2001/07/01 End date if known: Rate name: 34 XLP-HLF-1 Sector: Description: Available to consumers requiring a transformer capacity of 1000 KVA or more, but less than 5000 KVA, subject to eh Association's established rules and regulations. This rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others. Three phase, 60 cycles, at Association's standard or an approved voltage.

51

Data:4d1feeec-1e1b-4e35-ad07-16134805e16f | Open Energy Information  

Open Energy Info (EERE)

feeec-1e1b-4e35-ad07-16134805e16f feeec-1e1b-4e35-ad07-16134805e16f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Randolph Electric Member Corp Effective date: 2013/04/01 End date if known: Rate name: LP23 - LARGE POWER SERVICE Sector: Industrial Description: * This schedule is available to commercial or industrial businesses when the consumer's average monthly load requirements exceed 500 kW. Service under this schedule is subject to the established Rules and Regulations of the Cooperative This schedule is applicable to all electric service of the same available types required on the consumer's premises, delivered at one point and metered at or compensated to that voltage.

52

Activation of the human beta interferon gene by the adenovirus type 12 E1B gene  

SciTech Connect

The transcription of endogenous beta interferon mRNA was activated in human embryo kidney (HEK) cells infected with adenovirus 12 (Ad12) but was activated only inefficiently or not at all in HEK cells infected with Ad5 and rc-1 (Ad5 dl312 containing the Ad12 E1A region). The analysis with Ad12 mutants showed that Ad12 E1B products, especially the 19K protein, were important for the expression of the endogenous beta interferon gene and Ad12 E1A products were not involved in the expression. The expression of exogeneously transfected pIFN-CAT (a hybrid plasmid having the human beta interferon promoter fused with the CAT gene) was activated in HEK and chicken embryo fibroblast (CEF) cells infected with either Ad12 or Ad5. The analysis of cotransfection of CEF cells with pIFN-CAT and plasmids containing fragments of Ad12 or Ad5 DNA showed that Ad12 or Ad5 E1B (possibly the 19K protein) was and E1A was not involved in the expression of the exogenous pIFN-CAT.

Shiroki, K.; Toth, M.

1988-01-01T23:59:59.000Z

53

Data:F91e1dbe-c542-4690-9013-4bd17c0ce3e1 | Open Energy Information  

Open Energy Info (EERE)

dbe-c542-4690-9013-4bd17c0ce3e1 dbe-c542-4690-9013-4bd17c0ce3e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (MH 250w) Sector: Commercial Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s). .pdf

54

Closed-Form E1 Radiative Strength Functions for Gamma-Decay and Photoabsorption  

SciTech Connect

Photoabsorption cross sections and {gamma}-decay strength functions are calculated and compared with experimental data to test simple phenomenological models of E1 gamma-strength description in the middle-weight and heavy atomic nuclei. Radiative strength functions with energy asymmetric shape are recommended for overall estimation of averaged gamma-strengths. Systematics for giant dipole resonance (GDR) parameters are given.

Plujko, Vladimir A.; Kadenko, Igor M.; Kulich, Elizaveta V.; Gorbachenko, Oleksandr M. [Nuclear Physics Department, Taras Shevchenko National University, Pr. Acad. Glushkova, 2, bldg. 11, 03022 Kyiv (Ukraine)

2009-01-28T23:59:59.000Z

55

Evaluating Rail Transit Criticism  

E-Print Network (OSTI)

This report evaluates criticism of rail transit systems. It examines claims that rail transit is ineffective at increasing public transit ridership and improving transportation system performance, that rail transit investments are not cost effective, and that transit is an outdated form of transportation. It finds that critics often misrepresent issues and use biased and inaccurate analysis. This is a companion to the report Rail Transit in

Todd Litman

2010-01-01T23:59:59.000Z

56

DOE G 430.1-5, Transition Implementation Guide  

Directives, Delegations, and Requirements

This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of ...

2001-04-24T23:59:59.000Z

57

Photon transitions in Upsilon(2S) and Upsilon(3S)  

E-Print Network (OSTI)

We have studied the inclusive photon spectra in Upsilon(2S) and \\Upsilon(3S) decays using a large statistics data sample obtained with the CLEO III detector. We present the most precise measurements of electric dipole (E1) photon transition rates and photon energies for Upsilon(2S)->gamma chi_bJ(1P) and Upsilon(3S)->gamma chi_bJ(2P) J=0,1,2. We measure the rate for a rare E1 transition Upsilon(3S)->gamma chi_b0(1P) for the first time. We also set upper limits on the rates for the hindered magnetic dipole (M1) transitions to the eta_b(1S) and eta_b(2S) states.

M. Artuso; for the CLEO Collaboration

2004-11-22T23:59:59.000Z

58

Data:Babce0ee-7843-41e1-8208-5fbb616c359e | Open Energy Information  

Open Energy Info (EERE)

Babce0ee-7843-41e1-8208-5fbb616c359e Babce0ee-7843-41e1-8208-5fbb616c359e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: General Service Electric Space Heating Sector: Commercial Description: To any customer whose normal power and energy requirements are billed on Schedules GS-1 or LGS-1, supplied through one meter at one point of delivery for all power and energy used for qualifying electric space heating equipment. Space heating equipment shall be operated at 208 volts or more and be of a design approved by the Department.

59

Data:5c10bf2e-1c46-4dc1-a084-5080e7ff4daa | Open Energy Information  

Open Energy Info (EERE)

bf2e-1c46-4dc1-a084-5080e7ff4daa bf2e-1c46-4dc1-a084-5080e7ff4daa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Commercial General Service Time-of-Use* Sector: Commercial Description: *Applicability: To all electric service of one standard voltage, required on the customer's premises, delivered at one point and metered at or compensated to that voltage. No service rendered hereunder may be resold, nor transmitted to other premises, either directly or indirectly, without the express consent of the Cooperative.

60

Data:4bc8edda-d0e1-40ee-aac2-c2b32603a6b4 | Open Energy Information  

Open Energy Info (EERE)

edda-d0e1-40ee-aac2-c2b32603a6b4 edda-d0e1-40ee-aac2-c2b32603a6b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/03/01 End date if known: Rate name: ACTON Basic rate R3 Sector: Residential Description: Default Generation Service ("Default Service") shall be available to any Customer who, for any reason, is not receiving Generation Service from a Competitive Supplier. Service under this rate to any Customer is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Data:7ef9ab05-fc5b-4f26-b3a5-838c459e08e1 | Open Energy Information  

Open Energy Info (EERE)

ab05-fc5b-4f26-b3a5-838c459e08e1 ab05-fc5b-4f26-b3a5-838c459e08e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: Rate name: Residential Service - Medical Equipment Discount Program Sector: Residential Description: Applicability To customers receiving service under residential rates who meet the eligibility requirements listed below. II. Qualification An application must be completed along with certification from a qualified health professional stating that a medical need exists. A current definition of "qualified health professional" is posted on www.smud.org

62

Data:2b00281e-26bb-447b-a645-30e1c884b213 | Open Energy Information  

Open Energy Info (EERE)

281e-26bb-447b-a645-30e1c884b213 281e-26bb-447b-a645-30e1c884b213 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE R-4 RESIDENTIAL SERVICE-ASSISTANCE RATE (THREE PHASE) Sector: Residential Description: Additional Info: Applicability: This rate schedule is applicable to all electric service required by the Customer exclusively for domestic purposes for individual (single family) private residences and individually metered apartment units where the Customer qualifies based on economic need.

63

Data:F9270e2e-1ccb-4713-aed8-d99a41b19d77 | Open Energy Information  

Open Energy Info (EERE)

70e2e-1ccb-4713-aed8-d99a41b19d77 70e2e-1ccb-4713-aed8-d99a41b19d77 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Customer Generation Under Standby Concept - Transmission substation Sector: Industrial Description: To any customer whose requirements are taken at a point or points determined by the District under a contract of standard form, where the customer's total monthly demand load exceeds 20,000 kilowatts and the customer takes delivery on the secondary side of a District Substation on the customer's property. (Not applicable to resale, standby or auxiliary service.)

64

Data:95ec7fef-37e1-4e0c-812b-4af39577ab94 | Open Energy Information  

Open Energy Info (EERE)

fef-37e1-4e0c-812b-4af39577ab94 fef-37e1-4e0c-812b-4af39577ab94 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: Irrigation Year 4 Sector: Commercial Description: * Requires special equipment from SWRE and load management by the member between 4pm and 8pm,June 20- September 9 each year. Minimum:Higher of facilities charge plus kW/Demand charge of $96 per year. All bills are adjusted by applicable taxes. Summer rates cover May- October and Winter cover November- April. Source or reference: Rate binder # 4(Illinios State University)

65

Data:7e8b2679-6bee-4f29-bfcd-61cf3e1ae19b | Open Energy Information  

Open Energy Info (EERE)

b2679-6bee-4f29-bfcd-61cf3e1ae19b b2679-6bee-4f29-bfcd-61cf3e1ae19b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Chattanooga, Tennessee (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: GSD- Extra Large Commercial Sector: Industrial Description: This rate shall apply to the firm electric power requirements where a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 25,000 kW; provided that the other conditions of this section are met. Source or reference: https://www.epb.net/power/business/services/business-electrical-rates/

66

Data:Bc0d1518-7eca-44f4-8a3e-1a902027c1f3 | Open Energy Information  

Open Energy Info (EERE)

d1518-7eca-44f4-8a3e-1a902027c1f3 d1518-7eca-44f4-8a3e-1a902027c1f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: General Service Demand (October 2013) Sector: Commercial Description: Optional to all customers with demands of 25 kW or more for 3 consecutive months whose entire requirements are taken through 1 meter. Mandatory for customers with demands of 60 kW or more for two consecutive months. Not applicable to resale, stand-by, or auxiliary. Source or reference: ISU Documentation

67

Data:5577d8e1-1426-4a5e-848d-6136bfd4690b | Open Energy Information  

Open Energy Info (EERE)

e1-1426-4a5e-848d-6136bfd4690b e1-1426-4a5e-848d-6136bfd4690b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: End date if known: Rate name: General Service - Non-Demand Industrial Sector: Industrial Description: * This rate is applicable to electric service required by any customer to whom no other specific rate applies and whose demand for power does not meet or exceed 20 kilowatts for any month within the most recent six summer billing months or as determined by the City of Austin. This rate is also applicable to athletic field accounts whose connected load is more than 85% attributable to lighting as verified by the City of Austin.

68

Data:653f8e21-b66d-4dee-985b-d4e1da31742d | Open Energy Information  

Open Energy Info (EERE)

f8e21-b66d-4dee-985b-d4e1da31742d f8e21-b66d-4dee-985b-d4e1da31742d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Excelsior Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting Service- 250W MH Sector: Lighting Description: Applicable only to outdoor lighting by means of ballast operated lamp fixtures that do not require a dedicated transformer and street lighting service by means of ballast operated lamp fixtures, subject to the established rules and regulations of the Cooperative. Source or reference: ISU Documentation Source Parent: Comments

69

Data:8a5ab396-6e71-4598-9e16-55e6ae42c0e1 | Open Energy Information  

Open Energy Info (EERE)

6-6e71-4598-9e16-55e6ae42c0e1 6-6e71-4598-9e16-55e6ae42c0e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2011/10/01 End date if known: Rate name: Schedule 61 - South System General power Rate - Oil Pumping Sector: Commercial Description: This rate shall apply to the firm power requirements for electric service to commercial oil pumping load customers whose monthly read demand is greater than 300 and less than or equal to 1000 KW. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

70

Data:869b2063-643e-4e7c-a37b-08573c6b5e1f | Open Energy Information  

Open Energy Info (EERE)

63-643e-4e7c-a37b-08573c6b5e1f 63-643e-4e7c-a37b-08573c6b5e1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: End date if known: Rate name: Price Schedule ATS - Other Electric Service to Public Authorities - Traffic Controls Sector: Description: To all electric service required for traffic control signals and flashers by municipal, county, state and federal governments or agencies, subject to applicable terms and conditions of the Company's Electric Service Policies and Electric Rate Application. Source or reference: www.midamericanenergy.com Source Parent:

71

Data:3586dadf-833f-42a2-8cbc-8eb9e1f362d7 | Open Energy Information  

Open Energy Info (EERE)

dadf-833f-42a2-8cbc-8eb9e1f362d7 dadf-833f-42a2-8cbc-8eb9e1f362d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rockwood, Tennessee (Utility Company) Effective date: 2012/12/01 End date if known: Rate name: General (GSA Part 1) - Customer Charge #2 Sector: Industrial Description: * < 50 kW Demand General Power Rate - "applies to the firm power requirements for electric service to commercial, industrial, and governmental customers; institutional customers including but not limited to, churches, clubs, and like customers, except to whom service is available under other resale rate schedules."

72

Data:B084b37a-3e1c-482d-8041-d7ce3e7aa0ce | Open Energy Information  

Open Energy Info (EERE)

7a-3e1c-482d-8041-d7ce3e7aa0ce 7a-3e1c-482d-8041-d7ce3e7aa0ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Commercial Load Control Three Phase-Rate 61 Sector: Commercial Description: 1. Available for oil well pumping, commercial and industrial uses,where a portion of the consumer's peak demand may be reduced or eliminated through the use of installed load control equipment by the cooperative. 2. Service under this schedule is limited to consumers whose load requirements do not exceed 50kVA of transformer capacity.

73

Data:4e2729c4-e0b4-4e1c-8097-39f6b2eb1fac | Open Energy Information  

Open Energy Info (EERE)

e0b4-4e1c-8097-39f6b2eb1fac e0b4-4e1c-8097-39f6b2eb1fac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Cowlitz County Effective date: 2011/11/01 End date if known: Rate name: SCHEDULE 9 - LARGE INDUSTRIAL TRANSMISSION VOLTAGE DELIVERY Sector: Industrial Description: Applicable to any and all uses normally served by the District supplied through a single meter and one Point of Delivery and expected to require in excess of 1,000 kW of Billing Demand as determined by the District. Source or reference: http://www.cowlitzpud.org/electric_rates.php Source Parent: Comments Applicability

74

Data:15100492-c8e1-4575-b258-daadacbe7017 | Open Energy Information  

Open Energy Info (EERE)

492-c8e1-4575-b258-daadacbe7017 492-c8e1-4575-b258-daadacbe7017 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kiwash Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: STC04 Large Power Service Sector: Industrial Description: Available to qualifying consumers at a location on the Kiwash system for power and energy through term contract with emphasis on moderate load factor accounts. Minimum Billing Demand for this rate is 150 kW. Source or reference: ISU Sharepoint Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

75

MHK Projects/Evopod E1 1 10 scale grid connected demonstrator | Open Energy  

Open Energy Info (EERE)

Evopod E1 1 10 scale grid connected demonstrator Evopod E1 1 10 scale grid connected demonstrator < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":54.388,"lon":-5.566,"alt":0,"address":"","icon":"http:\/\/prod-http-80-800498448.us-east-1.elb.amazonaws.com\/w\/images\/7\/74\/Aquamarine-marker.png","group":"","inlineLabel":"","visitedicon":""}]}

76

A peptide inhibitor of exportin1 blocks shuttling of the adenoviral E1B 55 kDa protein but not export of viral late mRNAs  

Science Conference Proceedings (OSTI)

The human subgroup C adenoviral E1B 55 kDa and E4 Orf6 proteins are required for efficient nuclear export of viral late mRNAs, but the cellular pathway that mediates such export has not been identified. As a first step to develop a general approach to address this issue, we have assessed the utility of cell-permeable peptide inhibitors of cellular export receptors. As both E1B and E4 proteins have been reported to contain a leucine-rich nuclear export signal (NES), we synthesized a cell-permeable peptide containing such an NES. This peptide induced substantial inhibition of export of the E1B protein, whereas a control, non-functional peptide did not. However, under the same conditions, the NES peptide had no effect on export of viral late mRNAs. These observations establish that viral late mRNAs are not exported by exportin1, as well as the value of peptide inhibitors in investigation of mRNA export regulation in adenovirus-infected cells.

Flint, S.J. [Department of Molecular Biology, Princeton University, Princeton, NJ 08544 (United States)]. E-mail: sjflint@molbio.princeton.edu; Huang, Wenying [Department of Molecular Biology, Princeton University, Princeton, NJ 08544 (United States); Goodhouse, Joseph [Department of Molecular Biology, Princeton University, Princeton, NJ 08544 (United States); Kyin, Saw [Department of Molecular Biology, Princeton University, Princeton, NJ 08544 (United States)

2005-06-20T23:59:59.000Z

77

Gas turbine combustor transition  

DOE Patents (OSTI)

A method is described for converting a steam cooled transition to an air cooled transition in a gas turbine having a compressor in fluid communication with a combustor, a turbine section in fluid communication with the combustor, the transition disposed in a combustor shell and having a cooling circuit connecting a steam outlet and a steam inlet and wherein hot gas flows from the combustor through the transition and to the turbine section, includes forming an air outlet in the transition in fluid communication with the cooling circuit and providing for an air inlet in the transition in fluid communication with the cooling circuit. 7 figs.

Coslow, B.J.; Whidden, G.L.

1999-05-25T23:59:59.000Z

78

Gas turbine combustor transition  

DOE Patents (OSTI)

A method of converting a steam cooled transition to an air cooled transition in a gas turbine having a compressor in fluid communication with a combustor, a turbine section in fluid communication with the combustor, the transition disposed in a combustor shell and having a cooling circuit connecting a steam outlet and a steam inlet and wherein hot gas flows from the combustor through the transition and to the turbine section, includes forming an air outlet in the transition in fluid communication with the cooling circuit and providing for an air inlet in the transition in fluid communication with the cooling circuit.

Coslow, Billy Joe (Winter Park, FL); Whidden, Graydon Lane (Great Blue, CT)

1999-01-01T23:59:59.000Z

79

Sampling diffusive transition paths  

SciTech Connect

We address the problem of sampling double-ended diffusive paths. The ensemble of paths is expressed using a symmetric version of the Onsager-Machlup formula, which only requires evaluation of the force field and which, upon direct time discretization, gives rise to a symmetric integrator that is accurate to second order. Efficiently sampling this ensemble requires avoiding the well-known stiffness problem associated with sampling infinitesimal Brownian increments of the path, as well as a different type of stiffness associated with sampling the coarse features of long paths. The fine-features sampling stiffness is eliminated with the use of the fast sampling algorithm (FSA), and the coarse-feature sampling stiffness is avoided by introducing the sliding and sampling (S&S) algorithm. A key feature of the S&S algorithm is that it enables massively parallel computers to sample diffusive trajectories that are long in time. We use the algorithm to sample the transition path ensemble for the structural interconversion of the 38-atom Lennard-Jones cluster at low temperature.

F. Miller III, Thomas; Predescu, Cristian

2006-10-12T23:59:59.000Z

80

Data:11b9df1a-5989-48e4-bfe6-e1e665b94610 | Open Energy Information  

Open Energy Info (EERE)

df1a-5989-48e4-bfe6-e1e665b94610 df1a-5989-48e4-bfe6-e1e665b94610 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Area Light Metal Halide 400W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Quantifying requirements volatility effects  

Science Conference Proceedings (OSTI)

In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements ... Keywords: ?-ratio, ?-ratio, Compound monthly growth rate, IT dashboard, IT portfolio management, Quantitative IT portfolio management, Requirements churn, Requirements creep, Requirements metric, Requirements scrap, Requirements volatility, Requirements volatility dashboard, Scope creep, Volatility benchmark, Volatility tolerance factor

G. P. Kulk; C. Verhoef

2008-08-01T23:59:59.000Z

82

Baldrige Program Transition  

Science Conference Proceedings (OSTI)

The Baldrige Performance Excellence Program is transitioning to a Sustainable, Enterprise Model. ... A Vision to Be Among the Best. ...

2013-08-06T23:59:59.000Z

83

Management Transition Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Records and Information Records and Information Management Transition Guidance November 2013 Records and Information Management Transition Guidance i Records and Information Management Transition Guidance Table of Contents Executive Summary ........................................................................................................................ 1 1.0 Introduction and Purpose ..................................................................................................... 1 LM Records Functions ................................................................................................................ 1 2.0 The Records Life Cycle ....................................................................................................... 2 3.0 Organizational Responsibilities ........................................................................................... 2

84

Data:98ae74e1-9213-4013-8931-b28c094aff8d | Open Energy Information  

Open Energy Info (EERE)

ae74e1-9213-4013-8931-b28c094aff8d ae74e1-9213-4013-8931-b28c094aff8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Florence Utility Comm Effective date: 2009/11/30 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Single Phase 7am-7pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0791 per kilowatt-hour. Parallel Generation (20 kW or less) Net Energy Billing - Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of 20 kW or less, where such facilities are connected in parallel with the utility and where such facilities are approved by the utility. Rate: The customer shall be billed monthly on a net energy basis and shall pay the fixed charge and energy charge specified in the rate schedule under which he is served. If, in any month, the customer's bill has a credit balance of $25 or less, the amount shall be credited to subsequent bills until a debit balance is reestablished. If the credit balance is more than $25, the utility shall reimburse the customer by check upon request. Monthly credits shall be computed by taking the net excess kilowatt-hours produced times the sum of the applicable energy charge plus monthly power cost adjustment clause (PCAC). This rate will be applied to residential single-phase and three-phase customers for ordinary household purposes. Single-phase motors may not exceed 5 horsepower individual-rated capacity without utility permission.

85

BER Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

86

ASCR Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

87

TVDG Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Requirements TVDG Training Requirements information is now located at: http:www.bnl.govuserscenterTrainingtandem.asp. You will automatically be taken to the new...

88

Transit Users Group Supports Transit Agencies with Natural Gas Buses  

Science Conference Proceedings (OSTI)

Fact sheet describes the benefits of the Transit Users Group, which supports transit groups with compressed natural gas (CNG) buses.

Not Available

2002-04-01T23:59:59.000Z

89

Data:1af4c76f-e1f6-4369-a579-8ca93962f51a | Open Energy Information  

Open Energy Info (EERE)

af4c76f-e1f6-4369-a579-8ca93962f51a af4c76f-e1f6-4369-a579-8ca93962f51a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Public Street Lighting Service, Sodium Lamps, 14,000 Lumens, 150W (Existing Wood Pole) Sector: Lighting Description: The above rates for Standard Public Street Lighting Service are based on the costs of standard overhead service and standard wood poles. The Customer will be required to pay a one-time contribution-in-aide-of construction (CIAC) to cover the additional costs of any non-standard lighting service requested by the Customer. Non-standard public street lighting service consists of installations requiring more than one wood pole and special poles, transformers, line extensions, non-standard fixtures and lamps, or underground service. The CIAC shall be based on the difference between the cost to provide standard service and the actual cost of the non-standard service as per current standard cost .

90

Data:Dd1e1a9d-dc62-479a-ada5-cd015624c86b | Open Energy Information  

Open Energy Info (EERE)

e1a9d-dc62-479a-ada5-cd015624c86b e1a9d-dc62-479a-ada5-cd015624c86b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: LP2 Large Power Service - Sub-Transmission Substation Sector: Industrial Description: 1.1 This Rate Schedule LP-2 is offered for the entire electrical requirements at a single location of any industrial or manufacturing Customer requiring 5,000 kVa or more of installed transformer capacity, and for which there exists an executed power Purchase Contract between the Customer and the District. Resale of energy taken under this rate schedule by the Customer is not permitted.

91

Data:5702616f-8711-40cd-9ed5-e1f9ac60f02a | Open Energy Information  

Open Energy Info (EERE)

16f-8711-40cd-9ed5-e1f9ac60f02a 16f-8711-40cd-9ed5-e1f9ac60f02a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: El Paso Electric Co Effective date: 2010/07/01 End date if known: Rate name: Interruptible power service for cogeneration and small power production facilities (primary delivery) Sector: Commercial Description: This rate is available to qualifying facilities and to Customers taking service from a third party qualifying facility which qualifies as a small power production and cogeneration faci lity as defined in 18 CFR, Part 292, Subpart S, of the final rules issued by the Federal Energy Regulatory Commission to implement Sections 201 and 210 of the Public Utility Regulatory Policies Act of 1978. Customer will furnish to the Company such data as required by the Company to determine that customer meets the requirements for qualification. The facility may be connected for (1) parallel operation with the Company's service, or (2) isolated operation with Interruptible Power Service provided by the Company by means of a double-throw switch. INTERRUPTIBLE POWER SERVICE RATE - The Interruptible Power Service Rate shall be the Noticed Interruptible Power Service rates currently in effect and applicable to the Customer absent its qualifying facility generation.

92

Data:9fcbd44f-8c00-46e5-9ec2-e1cc4d1c7188 | Open Energy Information  

Open Energy Info (EERE)

fcbd44f-8c00-46e5-9ec2-e1cc4d1c7188 fcbd44f-8c00-46e5-9ec2-e1cc4d1c7188 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Seasonal Single Phase Sector: Commercial Description: * Single phase, 60 cycles, at available secondary voltage. To all members requiring single phase service for a period of less than six (6) months each year and served at less than 50 KVA capacity, subject to the rules and regulations of the cooperative. The total capacity of any single phase motor under this schedule shall not exceed 10 HP without written permission of the cooperative. Members requiring single phase service with capacities exceeding 50 KVA shall be served under the GS Rate Schedule.

93

Data:5a805d60-e1e0-4e0a-9d94-4335033f3235 | Open Energy Information  

Open Energy Info (EERE)

5d60-e1e0-4e0a-9d94-4335033f3235 5d60-e1e0-4e0a-9d94-4335033f3235 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 15B Large Service for public university >8000 kW at 115 kV Sector: Description: The rates on this schedule are available to any retail Customer which is a public university, with a minimum contract demand of 8,000 kW or more, operates Customer-owned generation, requests full requirements service from the Company commensurate with the Customer's normal electric service requirements, and takes service directly from PNM's transmission system at 115 kV.

94

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

95

Biology and Phase Transition - CECM  

E-Print Network (OSTI)

Dec 24, 2003 ... next · up · previous. Next: Kaufman and percolation Up: Phase Transition Models in Previous: Phase Transition Models in ...

96

Site Transition Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Transition Guidance March 2010 Office of Environmental Management U.S. Department of Energy Washington D. C. 20585 Standard Review Plan (SRP) Technical Framework for EM...

97

Hydrogen Transition Infrastructure Analysis  

DOE Green Energy (OSTI)

Presentation for the 2005 U.S. Department of Energy Hydrogen Program review analyzes the hydrogen infrastructure needed to accommodate a transitional hydrogen fuel cell vehicle demand.

Melendez, M.; Milbrandt, A.

2005-05-01T23:59:59.000Z

98

The Transition to Hydrogen  

E-Print Network (OSTI)

Prospects for Building a Hydrogen Energy Infrastructure,”and James S. Cannon. The Hydrogen Energy Transition: Movingof Energy, National Hydrogen Energy Roadmap, November 2002.

Ogden, Joan

2005-01-01T23:59:59.000Z

99

Transitioning to 12-hour shifts  

Science Conference Proceedings (OSTI)

In 1989, Yankee Rowe nuclear power station successfully implemented a 12-hour shift schedule for all shiftworkers (control room personnel, auxiliary operators, and radiation protection shift technicians) with many positive effects on morale, motivation, and performance. The transition from an 8-hour to a 12-hour shift schedule was initiated, organized, and promoted by the shiftworkers themselves after they had identified numerous inadequacies in the 8-hour shift schedule. Preliminary and final implementation required several steps: (a) a survey of needs, (b) research of potential schedules, (c) cost/benefit analysis, (d) resolution of any union contract conflicts, (e) management approval, and (f) trial shift schedule periods.

Suter, P.S.; Cervassi, S.M.

1993-03-01T23:59:59.000Z

100

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Storage-ring measurements of hyperfine induced transition rates in berylliumlike ions  

SciTech Connect

The status of experimental measurements and theoretical calculations of the hyperfine induced 2s2p{sup 3}P{sub 0}{yields}2s{sup 21}S{sub 0} transition rate in Be-like ions is reviewed. Possible reasons, such as external electromagnetic fields and competing E1M1 two-photon transitions, for presently existing significant discrepancies between experiment and theory are discussed. Finally, directions for future research are outlined.

Schippers, Stefan [Institute for Atomic and Molecular Physics, Justus-Liebig-University Giessen, Leihgesterner Weg 217, 35392 Giessen (Germany)

2013-07-11T23:59:59.000Z

102

Requirement-Reviews.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Published 3 h%p:www.nersc.govsciencerequirements---reviews final---reports * Compurequirements f or 20132014 * Execurequirements * Case s...

103

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

104

Collaborative Requirements Engineering Project  

Science Conference Proceedings (OSTI)

... dependencies, safety, and environmental requirements) is essential to the ... Construction, and Operation of Constructed Facilities, March 2012. ...

2013-01-03T23:59:59.000Z

105

Emergency Medical Treatment Required  

E-Print Network (OSTI)

Emergency Medical Treatment Required Non-Emergency Medical Treatment Required If possible, get help present if possible OptaComp will complete the "First Report of Injury or Illness" and authorize medical Investigation Report" to Environmental Health & Safety within 48 hours Emergency Medical Treatment Required

Weston, Ken

106

FES Science Network Requirements  

E-Print Network (OSTI)

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

107

PIT Coating Requirements Analysis  

SciTech Connect

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

108

Data:58c791cf-e1ba-44b8-b5c8-b55d13267846 | Open Energy Information  

Open Energy Info (EERE)

c791cf-e1ba-44b8-b5c8-b55d13267846 c791cf-e1ba-44b8-b5c8-b55d13267846 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Large Power service-Secondary-Time of use(S-T) Sector: Industrial Description: This rate is available, by written contract only, to any industrial, commercial or general customer whose service is taken at secondary voltage and whose maximum demand is 500 kilowatts or more during any one of the five consecutive months from November through March. Service will be three phase, sixty hertz, alternating current, supplied from a distribution line and delivered at secondary voltage as described in the Company's Standard Requirements

109

Data:9c956fdc-41dd-4775-98ef-d96d284e1ae9 | Open Energy Information  

Open Energy Info (EERE)

fdc-41dd-4775-98ef-d96d284e1ae9 fdc-41dd-4775-98ef-d96d284e1ae9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Pend Oreille Cnty Effective date: 2011/07/01 End date if known: Rate name: Yard Light Service 100w Sodium Vapor Sector: Lighting Description: Availability Available to businesses, farms, apartments, residences and for cooperative community lighting. Service Provided The District shall install, operate and maintain standard luminar refractor-type fixtures on its existing poles or on District-provided treated poles. The customer shall pay the base rate as provided below and a $75.00 installation fee when the installation of a fixture requires setting of a wood pole for which there is no other function. An additional fee of $50.00 will be assessed when there is a request, or due to the type of electrical facilities in the area, that the luminar be connected via underground cable. Additional installation charges may also be added to amortize costs of special fixtures, poles, or other special equipment. Tenants or rental property must secure written permission from the property owner authorizing the District to make installation on the property.

110

Data:6198419f-1d61-43e1-b12b-aa060fabc36b | Open Energy Information  

Open Energy Info (EERE)

1d61-43e1-b12b-aa060fabc36b 1d61-43e1-b12b-aa060fabc36b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE G-2 SINGLE PHASE (MEDIUM GENERAL SERVICE) Sector: Commercial Description: This rate schedule is applicable to all electric service required by the Customer for lighting, power and any other purpose, other than residential service, where the Customer's maximum metered demand is equal to or greater than 20 kW for any two months during any twelve month period. The monthly Billing Demand shall be the greater of: a) the highest metered kilowatt demand established during any 15 minute interval during the month; b) 95% of the greatest metered or calculated kVA during the month; or c) 20 kW.

111

Data:Caeb3e1a-e983-4b04-a88f-e8d28cffaff6 | Open Energy Information  

Open Energy Info (EERE)

Caeb3e1a-e983-4b04-a88f-e8d28cffaff6 Caeb3e1a-e983-4b04-a88f-e8d28cffaff6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule B-Tod-Grain Drying(General Purpose-Three Phase)Time of Day Sector: Residential Description: Available to cooperative members requiring three phase and incidental single phase electric service and monthly demand less than one hundred kilowatts. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

112

Data:Cf0e1cd2-9b39-480b-ae0d-d7cffec30164 | Open Energy Information  

Open Energy Info (EERE)

Cf0e1cd2-9b39-480b-ae0d-d7cffec30164 Cf0e1cd2-9b39-480b-ae0d-d7cffec30164 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: 4-County Electric Power Assn Effective date: End date if known: Rate name: Time of Day TGSA (50 kW - 1000 kW) Sector: Commercial Description: *This rate shall be available for the firm power requirements (where the higher of a customer's onpeak or offpeak contract demand is 5,000 kW or less) for electric service to commercial, industrial, and governmental customers, and to institutional customers including, without limitation, churches, clubs, fraternities, orphanages, nursing homes, rooming or boarding houses, and like customers, provided that the other conditions of this section are met.

113

Data:577e9156-d3fb-45e7-b1f4-9e1a62d98481 | Open Energy Information  

Open Energy Info (EERE)

e9156-d3fb-45e7-b1f4-9e1a62d98481 e9156-d3fb-45e7-b1f4-9e1a62d98481 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 1984/09/28 End date if known: Rate name: Pgs-2 Customer-Owned Generation Systems (Greater than 20 kW) Sector: Description: 2. Availability - Available for single-phase and three-phase customers where a part or all of the electrical requirements of the customer are supplied by the customer's generating facilities, where such facilities have a total generating capability of greater than 20 kW and less than or equal to 100 kW, where such facilities are connected in parallel with the utility. Customers not desiring to sell energy under this rate have the right to negotiate a buy-back rate.

114

Data:A37d05f3-683c-49f1-a163-36c3742d5e1d | Open Energy Information  

Open Energy Info (EERE)

d05f3-683c-49f1-a163-36c3742d5e1d d05f3-683c-49f1-a163-36c3742d5e1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntsville, Alabama (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Time Differentiated Hours Use of Demand Manufacturing Rate- TDMSA Sector: Industrial Description: This rate shall be available for firm electric power requirements where (a) a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 1,000 kW but not more than 15,000 kW, (b) the major use of electricity is for activities conducted at the delivery point serving that customer which are classified with a 2-digit Standard Industrial Classification Code between 20 and 39.

115

Data:11d48e1b-18f7-4012-a944-a8e5b7a11d0c | Open Energy Information  

Open Energy Info (EERE)

e1b-18f7-4012-a944-a8e5b7a11d0c e1b-18f7-4012-a944-a8e5b7a11d0c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: STREET LIGHTING SYSTEM SERVICE 100W High Pressure Sodium Decorative Sector: Lighting Description: Available for year-round illumination of public streets, parkways, and highways by High Pressure Sodium (HPS) or Metal Halide electric lamps in luminaires supported on poles, where the facilities for this service are furnished by Company. Underground Service under this schedule is limited to areas having a Company owned underground electric distribution system. Standard Service includes a monthly payment for the lighting system cost. Pre-Pay Option requires customer payment for the lighting system cost before establishing service.

116

Data:1524a36e-1c22-4219-81ab-b230eae8532a | Open Energy Information  

Open Energy Info (EERE)

a36e-1c22-4219-81ab-b230eae8532a a36e-1c22-4219-81ab-b230eae8532a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota Effective date: 2012/05/01 End date if known: Rate name: STREET LIGHTING SYSTEM SERVICE 100W High Pressure Sodium Overhead Sector: Lighting Description: Available for year-round illumination of public streets, parkways, and highways by High Pressure Sodium (HPS) or Metal Halide electric lamps in luminaires supported on poles, where the facilities for this service are furnished by Company. Underground Service under this schedule is limited to areas having a Company owned underground electric distribution system. Standard Service includes a monthly payment for the lighting system cost. Pre-Pay Option requires customer payment for the lighting system cost before establishing service.

117

Data:78e274e1-22f4-4bf0-8ab7-2cacd44ffb22 | Open Energy Information  

Open Energy Info (EERE)

e1-22f4-4bf0-8ab7-2cacd44ffb22 e1-22f4-4bf0-8ab7-2cacd44ffb22 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2012/01/01 End date if known: Rate name: OS TRAF99 Traffic Signals Sector: Lighting Description: To any customer whose service is not provided by any other rate schedule, for his entire electric requirements at a single location. Consumption hereunder will be calculated based upon electric rating of component(s). Resale of energy purchased under this rate schedule is not permitted. Source or reference: https://www.jea.com/About_Us/Tariffs_and_Reports/Tariffs_and_Reports.aspx

118

Data:82d535e4-c2ee-45f2-a514-e1e2dafa8c68 | Open Energy Information  

Open Energy Info (EERE)

5e4-c2ee-45f2-a514-e1e2dafa8c68 5e4-c2ee-45f2-a514-e1e2dafa8c68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oregon Trail El Cons Coop, Inc Effective date: 2011/10/01 End date if known: Rate name: Small Commercial, Schedule G1 Sector: Commercial Description: Available in OTEC service territory for non-residential service requiring 50 kVA or less of transformer capacity, subject to policies as established by the Board of Directors. Power cost adjustment: The power cost adjustment will follow Bonneville Power Administration's (BPA) temporary charges to OTEC as they adjust their wholesale rates up or down through BPA's Cost Recovery Adjustment Clauses (CRAC). The power cost adjustment will also include future price increases in the cogeneration power purchase contracts.

119

Data:2dd6a9ee-8267-4a08-be40-25539b50e1e4 | Open Energy Information  

Open Energy Info (EERE)

dd6a9ee-8267-4a08-be40-25539b50e1e4 dd6a9ee-8267-4a08-be40-25539b50e1e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Park Electric Coop Inc Effective date: End date if known: Rate name: Residential - Net-Metered - Base #3 Sector: Residential Description: * Service on this schedule is limited to single phase consumers requiring not more than 50 KVA of installed transformer capacity. Park Electric will provide as standard service, up to 200 Amp capacity for the base rate. Over 200 Amp service will be $.50 per KVA in excess of 15 KVA plus the base rate. Line extension minimums under contract will supersede these minimums, if the line extension minimum is higher.

120

Data:164c9b78-0248-4e1a-8760-fb9847e7671a | Open Energy Information  

Open Energy Info (EERE)

c9b78-0248-4e1a-8760-fb9847e7671a c9b78-0248-4e1a-8760-fb9847e7671a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Maine Power Co Effective date: 2012/07/01 End date if known: Rate name: AL Discontinued Lighting-Prismasphere Simple H. P. Sodium 150 watts Sector: Lighting Description: This rate is available for area lighting service furnished on a dusk-to-dawn basis. The Company will furnish, install and maintain area lights in new locations as may be requested in writing for area lighting service, subject to the TERM OF SERVICE specified below. TERM OF SERVICE The term of service under this schedule shall be by service agreement for a period of fifteen (15) years and on a continuing basis thereafter. Requests for additions, changes or removals for area lighting service may require 90 days' advance written notice.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:Ec14c030-53de-470e-aad1-570669e1b8dd | Open Energy Information  

Open Energy Info (EERE)

4c030-53de-470e-aad1-570669e1b8dd 4c030-53de-470e-aad1-570669e1b8dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting- Ornamental Lighting and Poles (Sodium Vapor Road Cut-Off 150 W) Sector: Lighting Description: GMP shall own, supply and maintain all ornamental lighting and poles, with energy supplied by underground facilities at the rates set forth below. Installation of ornamental poles, luminaries and wires will be paid for by the Customer as a line extension under GMP's line extension tariff and Public Service Board ("PSB") Rule 5.600. The Customer will be required to purchase and install 2" Sch. 40 electrical grade EPVC conduit and install pre-cast concrete bases for mounting the light poles. Customers should contact GMP's engineering department for details and assistance.

122

Data:59769306-21a4-49b9-be9a-ed1e1ca4eb0f | Open Energy Information  

Open Energy Info (EERE)

9306-21a4-49b9-be9a-ed1e1ca4eb0f 9306-21a4-49b9-be9a-ed1e1ca4eb0f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: 250 W Mercury Vapor- Security Light Sector: Lighting Description: To any Customer to light an area of an existing meter service location agreeable to the System, for which System lamps with photocell dusk-to-dawn control will be installed on System poles. Bill includes ancillary charges that must be added to the fixed monthly charge: Each pole required $1.75 Each span of overhead secondary not exceeding 150 feet $0.75 Each underground secondary $2.50 Festoon Photocell Controlled Outlets ($/outlet) $3.78 Festoon Continuous Service Outlets ($/lamp) $10.56

123

Data:B9af95f2-c5ce-465c-b5a7-b90811ac84e1 | Open Energy Information  

Open Energy Info (EERE)

af95f2-c5ce-465c-b5a7-b90811ac84e1 af95f2-c5ce-465c-b5a7-b90811ac84e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Primary Service - Non-IDR Metered, 400-2000 kVa (TC-LGS) Sector: Commercial Description: Delivery Service will be single or three-phase, 60 hertz, at a standard primary voltage. Delivery Service will be metered using Company's standard Meter provided for this type of Delivery Service. Any Meter other than the standard Meter will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, of this Tariff.

124

Data:Fcb6fa8d-f513-4216-8e1f-bcc45ca768c4 | Open Energy Information  

Open Energy Info (EERE)

Fcb6fa8d-f513-4216-8e1f-bcc45ca768c4 Fcb6fa8d-f513-4216-8e1f-bcc45ca768c4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southwest Rural Elec Assn Inc Effective date: 2010/11/01 End date if known: Rate name: Large time of use over 25kw Sector: Commercial Description: * Requires special contract and equipment from SWRE and load management by the member between 4pm and 8pm, June 20-Sept 9 each year. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

125

Data:95957a4b-7e2b-41fe-a642-51703e1fc5fa | Open Energy Information  

Open Energy Info (EERE)

a4b-7e2b-41fe-a642-51703e1fc5fa a4b-7e2b-41fe-a642-51703e1fc5fa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: Outdoor Area Lighting 150w Sodium Vapor Area Light Style Sector: Lighting Description: Applicability To outdoor area lighting service on Customer property. Character of Service Lighting service from dusk to dawn daily, by means of PUD-owned luminaries mounted on PUD-owned poles. Maintenance by the PUD includes lamp, photo cell and fixture replacement as needed. Individual lamps will be replaced on burnout as soon as reasonably possible after notification by the Customer and subject to the PUD's operating schedules and requirements.

126

Data:B3973954-ca7e-4426-ba21-d244e1c32a5f | Open Energy Information  

Open Energy Info (EERE)

73954-ca7e-4426-ba21-d244e1c32a5f 73954-ca7e-4426-ba21-d244e1c32a5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Idaho Power Co Effective date: 2012/01/01 End date if known: Rate name: Schedule 46 - Alternate Distribution Service Sector: Description: AVAILABILITY Alternate Distribution Service under this schedule is available at points on the Company's interconnected system within the State of Idaho where existing facilities of adequate capacity and desired phase and voltage are adjacent to the location where Alternate Distribution Service is desired, and where additional investment by the Company for new distribution facilities is not necessary to supply the requested service. When additional transmission or substation facilities are required, separate arrangements will be made between the Customer and the Company. Alternate Distribution Service is available only to Customers taking Primary Service under Schedule 9 or 19.

127

Data:Fdf48ae2-53ac-413b-9e71-8d3f566442e1 | Open Energy Information  

Open Energy Info (EERE)

Fdf48ae2-53ac-413b-9e71-8d3f566442e1 Fdf48ae2-53ac-413b-9e71-8d3f566442e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: General Service - Medium Load Factor-Secondary Voltage (Breakdown Service Minimum Demand Charge) Sector: Industrial Description: Customers with cogeneration and/or small power production facilities which qualify under Section 210 of the Public Utility Regulatory Policies Act of 1978 shall take service under Schedule COGEN/SPP, Schedule NEMS, or by special agreement with the Company. A time-of-day meter is required to take service under this provision. All other customers having sources of electrical

128

Data:6277ed1e-be34-4628-837b-989fcb1e1b6a | Open Energy Information  

Open Energy Info (EERE)

ed1e-be34-4628-837b-989fcb1e1b6a ed1e-be34-4628-837b-989fcb1e1b6a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2012/01/01 End date if known: Rate name: Residential Service Single-Phase Sector: Residential Description: AVAILABILITY Available in all territory served by the Cooperative, subject to the established Service Rules and Regulations of the Cooperative. APPLICABILITY This schedule is applicable to and available for residential use only, or for uses incidental thereto, to be supplied through one meter to each residence, apartment unit, or farm. The capacity of individual motors served under this classification shall not exceed 10 H.P. The Cooperative may require a written contract for any requested three-phase service.

129

Data:6113bfc2-46dd-4a10-8ac7-c5a88e1aab44 | Open Energy Information  

Open Energy Info (EERE)

bfc2-46dd-4a10-8ac7-c5a88e1aab44 bfc2-46dd-4a10-8ac7-c5a88e1aab44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: General Service, 400 Amp Service or less - 100% Renewable Wind Energy Sector: Commercial Description: To commercial and general service Customers not subject to other specific rate schedules, and whose service entrance requirements are single-phase, 400 amps or less, or three-phase, 200 amps or less. Source or reference: https://www.crpud.net/about-us/columbia-river-pud-rate-schedules/#rate-schedule------nbsp-residential-service

130

Data:2bbbd994-443f-439c-9040-adca5ec1e1d4 | Open Energy Information  

Open Energy Info (EERE)

bbbd994-443f-439c-9040-adca5ec1e1d4 bbbd994-443f-439c-9040-adca5ec1e1d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: Outdoor Lighting Energy: Ballasted Lamps 200W Sector: Lighting Description: I. AVAILABILITY Service is available to any developer, community association, or governmental authority where 120-volt service exists. The cost of service provides for electricity only from existing Northeastern REMC (Northeastern) facilities. Any investment occasioned by the extension of secondary lines or the installation of a transformer for the sole purpose of this service shall require a contract setting forth the charge for the additional investment.

131

Data:Cd8f807d-ce48-41aa-bc9f-4d954e1a0193 | Open Energy Information  

Open Energy Info (EERE)

7d-ce48-41aa-bc9f-4d954e1a0193 7d-ce48-41aa-bc9f-4d954e1a0193 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACTON - Residential R-2 (A-2) Sector: Residential Description: Upon written application, this rate is available for all domestic uses in a single private dwelling, in an individual apartment or in a residential condominium to any Customer meeting the qualifications stated in the special provisions section of this rate. Service under this rate to residential condominiums is available to the extent permitted by applicable regulations of the Massachusetts Department of Public Utilities (the "M.D.P.U.") and is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

132

Data:F9c96321-c5e1-403e-9476-ae4d8356bbfc | Open Energy Information  

Open Energy Info (EERE)

c96321-c5e1-403e-9476-ae4d8356bbfc c96321-c5e1-403e-9476-ae4d8356bbfc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipmont Rural Elec Member Corp Effective date: 2012/08/22 End date if known: Rate name: SCHEDULE 7: Low Load Factor Service Sector: Commercial Description: *Per month applied to the kVA transformer capacity required for service is $0.20 per kVA per month Source or reference: http://www.tipmont.org/about-us/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

133

Data:D66f9bbf-edd9-471d-805c-ea16d58537e1 | Open Energy Information  

Open Energy Info (EERE)

bbf-edd9-471d-805c-ea16d58537e1 bbf-edd9-471d-805c-ea16d58537e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wolverine Pwr Supply Coop, Inc Effective date: 2013/02/26 End date if known: Rate name: Schedule SA- Street Lighting Service (Metered) Sector: Lighting Description: The Energy Policy Act of 2005 requires that mercury vapor lamp ballasts shall not be manufactured or imported after January 1, 2008. To the extent that the Cooperative has the necessary materials, the Cooperative will continue to maintain existing mercury vapor lamp installations in accordance with this Electric Rate Schedule. With respect to mercury vapor lamp installations, rates apply to existing luminaires only and are not open to new business except where the Cooperative elects, at the customer'srequest, to install additional luminaires within an area already served by a mercury vapor unmeteredlighting system. Any such election is subject to the Cooperative having the necessary materials and to the discretion of the Cooperative

134

Data:85b1706a-9bf5-49e1-bf7c-fff9e05443d5 | Open Energy Information  

Open Energy Info (EERE)

706a-9bf5-49e1-bf7c-fff9e05443d5 706a-9bf5-49e1-bf7c-fff9e05443d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Customer Generation Under Buy/Sell Concept - Subtransmission Lines Sector: Industrial Description: To any customer whose requirements are taken at a point or points determined by the District under a contract of standard form, where the customer's total monthly demand load exceeds 20,000 kilowatts and the customer takes delivery on the secondary side of a District Substation on the customer's property. (Not applicable to resale, standby or auxiliary service.)

135

DOE Grids Service Transition  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Grids Service Transition DOE Grids Service Transition Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) DOE Grids Service Transition Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net DOE Grids Service Transition Background ESnet has decided to transition support and management for the certificate services provided by the DOE Grids public key infrastructure (PKI) to the Open Sciences Grid (OSG). OSG and ESnet provide service to many of the same user communities, and have long been collaborators in the areas of identity

136

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

137

Inhibition of interferon-inducible gene expression by adenovirus E1A proteins: Block in transcriptional complex formation  

SciTech Connect

Infection with wild-type adenovirus 5, but not with a mutant lacking the E1A gene, prevented the induction by interferon (IFN) {alpha} of chloramphenicol acetyltransferase (CAT) activity in HeLaM cell lines that had been permanently transfected with chimeric CAT reporter genes driven by the transcriptional regulatory regions of the IFN-inducible CAT activity was observed in cells that were cotransfected with the same reporter genes and plasmids expressing either the E1A 289- or 243-amino acid protein. These proteins also prevented the induction of CAT activity by IFN-{gamma} from a cotransfected HLA-DR{alpha}-CAT gene. Experiments with E1A mutants mapped the inhibitory activity to amino acid residues 38-65 of these proteins. In a HeLa cell line permanently expressing the E1A 289-amino acid protein, the replication of vesicular stomatitis virus and encephalomyocarditis virus was not inhibited by IFN-{alpha}, suggesting a global blockade of IFN responses. The observed transcriptional inhibition could be attributed to the lack of formation of the crucial IFN-stimulated gene factor 3 (ISGF3) transcriptional complex. As shown by mobility shift assays, this complex was not formed in the nuclear extracts of IFN-treated adenovirus-infected cells or IFN-treated E1A-producing cells. These nuclear extracts were deficient in both ISGF3{alpha} and ISGF3{gamma} subunits. However, they did not block the formation of ISGF3 complex from exogenously added components.

Kalvakolanu, D.V.R.; Bandyopadhyay, S.K.; Harter, M.L.; Sen, G.C. (Cleveland Clinic Foundation, OH (United States))

1991-09-01T23:59:59.000Z

138

Federal Transit Administration-National Transit Database (NTD) | Open  

Open Energy Info (EERE)

Federal Transit Administration-National Transit Database (NTD) Federal Transit Administration-National Transit Database (NTD) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Federal Transit Administration-National Transit Database (NTD) Agency/Company /Organization: Federal Transit Administration Sector: Energy Focus Area: Transportation Resource Type: Dataset User Interface: Website Website: www.ntdprogram.gov/ntdprogram/ Cost: Free Language: English Federal Transit Administration-National Transit Database (NTD) Screenshot References: National Transit Database[1] "The NTD was established by Congress to be the Nation's primary source for information and statistics on the transit systems of the United States. Recipients or beneficiaries of grants from the Federal Transit Administration (FTA) under the Urbanized Area Formula Program (§5307) or

139

Mandatory Supervisory Training Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

140

Management requirements for accreditation  

Science Conference Proceedings (OSTI)

... handbook, shall be defined in the quality manual. ... It is a fundamental requirement that the results ... NIST Handbook 150 (and ISO/IEC 17025) details ...

2013-08-20T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... need excellent situational awareness in order to do their jobs effectively. ... performance requirements as shown in Figure 2. This analysis was used ...

2013-03-13T23:59:59.000Z

142

CCI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for...

143

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... Usage scenario. ... imposed by public safety applications and usage scenarios is key in ... requirements as shown in Figure 2. This analysis was used as ...

2010-10-05T23:59:59.000Z

144

ASCR Science Network Requirements  

E-Print Network (OSTI)

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD — April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

145

New Employee Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

All New Employees New Supervisors New Employee Training Requirements Welcome to Berkeley Lab We value you and the talents that you bring to our workplace. The training listed...

146

Systematic study of low-lying E1 strength using the time-dependent mean field theory  

Science Conference Proceedings (OSTI)

We carry out systematic investigation of electric dipole (E1) mode from light to heavy nuclei, using a new time-dependent mean field theory: the Canonical-basis Time-Dependent Hartree-Fock-Bogoliubov (Cb-TDHFB) theory. The Cb-TDHFB in the three-dimensional coordinate space representation can deal with pairing correlation and any kind of deformation in the timedependent framework. We report the neutron-number dependence of the low-energy E1 mode for light (A > 40) and heavy isotopes (A < 100) around N= 82.

Ebata, S.; Nakatsukasa, T.; Inakura, T. [Center for Nuclear Study, Univ. of Tokyo, Bunkyo-ku, 113-0033, Japan and Theoretical Nuclear Physics Laboratory, RIKEN Nishina Center, Wako-shi, 351-0198 (Japan); Theoretical Nuclear Physics Laboratory, RIKEN Nishina Center, Wako-shi, 351-0198 (Japan) and Center for Computational Sciences, Univ. of Tsukuba, Tsukuba-shi, 305-8571 (Japan); Theoretical Nuclear Physics Laboratory, RIKEN Nishina Center, Wako-shi, 351-0198 (Japan)

2012-11-12T23:59:59.000Z

147

Data:Df85b9b4-bde2-474a-a2e1-28b897dd813d | Open Energy Information  

Open Energy Info (EERE)

b4-bde2-474a-a2e1-28b897dd813d b4-bde2-474a-a2e1-28b897dd813d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 27- SMALL TIME-OF-DAY GENERAL ELECTRIC SERVICE (Distribution Service Facilities Ownership) Sector: Commercial Description: AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 350 kW. Notwithstanding the applicability provisions of other rates, this rate is also available to full requirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 30 after March 1, 1992.

148

Data:28a6eac6-5086-4e1b-98b7-0affc6f5483d | Open Energy Information  

Open Energy Info (EERE)

eac6-5086-4e1b-98b7-0affc6f5483d eac6-5086-4e1b-98b7-0affc6f5483d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipmont Rural Elec Member Corp Effective date: 2010/01/22 End date if known: Rate name: SCHEDULE SL: 1000W Mercury Vapor Flood(unmetered) Sector: Lighting Description: 1. AVAILABILITY Available for overhead street lighting in the towns of Battle Ground, Linden, New Richmond, Wingate, and Romney, in accordance with contracts which may be signed by each municipality or by the sponsoring organization. 2. CHARACTER OF SERVICE Tipmont Rural Electric Membership Corporation (REMC) will furnish all necessary equipment to operate and maintain an overhead street lighting system in conjunction with and as a part of its general overhead electric distribution system, and the REMC will furnish all electric power required for the purpose of furnishing overhead street lighting service to the member. The municipalities shall pay all installation, labor and material of additional poles and conductor required to extend existing lines to the proposed street light locations. The lighting hours for the said overhead street lighting system shall be on a "dusk to dawn" schedule, which provides that lamps are to be lighted approximately one-half hour after sunset until approximately one-half hour before sunrise each day in the year.

149

Data:45b1b492-e1f1-49a5-9d10-53f0e1dd6b13 | Open Energy Information  

Open Energy Info (EERE)

2-e1f1-49a5-9d10-53f0e1dd6b13 2-e1f1-49a5-9d10-53f0e1dd6b13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: Residential Service Sector: Residential Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

150

Transition-Metal Hydrides  

NLE Websites -- All DOE Office Websites (Extended Search)

Transition-Metal Hydride Electrochromics Transition-Metal Hydride Electrochromics A new type of electrochromic hydride material has interesting and unusual properties. Thin Ni-Mg films, for example, are mirror-like in appearance and have very low visible transmittance. On exposure to hydrogen gas or on reduction in alkaline electrolyte, the films become transparent. The transition is believed to result from formation of nickel magnesium hydride, Mg2NiH4. Switchable mirrors based on rare earth hydrides were discovered in 1996 at Vrije University in the Netherlands, Rare earth-magnesium alloy films were subsequently found to be superior to the pure lanthanides in maximum transparency and mirror-state reflectivity by Philips Laboratories. The newer transition-metal types which use less expensive and less reactive materials were discovered at LBNL. This has now become a very active area of study with a network of researchers.

151

Alternative fuel transit buses  

DOE Green Energy (OSTI)

The National Renewable Energy Laboratory (NREL) is a U.S. Department of Energy (DOE) national laboratory; this project was funded by DOE. One of NREL`s missions is to objectively evaluate the performance, emissions, and operating costs of alternative fuel vehicles so fleet managers can make informed decisions when purchasing them. Alternative fuels have made greater inroads into the transit bus market than into any other. Each year, the American Public Transit Association (APTA) surveys its members on their inventory and buying plans. The latest APTA data show that about 4% of the 50,000 transit buses in its survey run on an alternative fuel. Furthermore, 1 in 5 of the new transit buses that members have on order are alternative fuel buses. This program was designed to comprehensively and objectively evaluate the alternative fuels in use in the industry.

Motta, R.; Norton, P.; Kelly, K. [and others

1996-10-01T23:59:59.000Z

152

Information and Records Management Transition Guidance | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004)...

153

Integrated Management Requirements mapping  

Science Conference Proceedings (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

154

Control Strategies For Transit Priority  

E-Print Network (OSTI)

Light Rail Transit," Transportation Research Record, No.Rail Signal Control Strategies by Combining Transit and Traffic Simulation Models," Transportation Research

Skabardonis, Alexander

1998-01-01T23:59:59.000Z

155

Site Transition Process Upon Cleanup Completion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup...

156

Photon Transitions in ?(2S) Decays to ?_{cJ}(1P) and ?_c(1S)  

E-Print Network (OSTI)

We have studied the inclusive photon spectrum in psi(2S) decays using the CLEO III detector. We present the most precise measurements of electric dipole (E1) photon transition rates for psi(2S)--> gamma chicJ(1P) (J=0,1,2). We also confirm the hindered magnetic dipole (M1) transition, psi(2S)-->gamma etac(1S). However, the direct M1 transition psi(2S)-->gamma etac(2S) observed by the Crystal Ball as a narrow peak at a photon energy of 91 MeV is not found in our data.

S. B. Athar

2004-08-26T23:59:59.000Z

157

IGT Stack No. 6 (SDG{ampersand}E-1) Test Plan and Component Specification Document: Topical report, March 1996  

DOE Green Energy (OSTI)

The purpose of Stack-6 (SDG{ampersand}E-1) is to scale up and demonstrate the long term performance and endurance characteristics of the IMHEX stack design and the Generation No. 2 cell components (improved pore matching electrodes) in a 20 cell subscale stack test.

NONE

1997-12-31T23:59:59.000Z

158

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

159

Technical Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

160

BES Science Network Requirements  

E-Print Network (OSTI)

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NSLS II: Authentication Required  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Pages Login Access to this area of the NSLS-II website requires a valid username and password. Username: Password: Next > Last Modified: April 2, 2013 Please forward all...

162

Examining hydrogen transitions.  

DOE Green Energy (OSTI)

This report describes the results of an effort to identify key analytic issues associated with modeling a transition to hydrogen as a fuel for light duty vehicles, and using insights gained from this effort to suggest ways to improve ongoing modeling efforts. The study reported on here examined multiple hydrogen scenarios reported in the literature, identified modeling issues associated with those scenario analyses, and examined three DOE-sponsored hydrogen transition models in the context of those modeling issues. The three hydrogen transition models are HyTrans (contractor: Oak Ridge National Laboratory), MARKAL/DOE* (Brookhaven National Laboratory), and NEMS-H2 (OnLocation, Inc). The goals of these models are (1) to help DOE improve its R&D effort by identifying key technology and other roadblocks to a transition and testing its technical program goals to determine whether they are likely to lead to the market success of hydrogen technologies, (2) to evaluate alternative policies to promote a transition, and (3) to estimate the costs and benefits of alternative pathways to hydrogen development.

Plotkin, S. E.; Energy Systems

2007-03-01T23:59:59.000Z

163

The Iron Spin Transition in the Earth's Lower Mantle  

NLE Websites -- All DOE Office Websites (Extended Search)

The Iron Spin Transition in the The Iron Spin Transition in the Earth's Lower Mantle The Iron Spin Transition in the Earth's Lower Mantle Print Wednesday, 30 April 2008 00:00 It is now known that the iron present in minerals of the lower mantle of the Earth undergoes a pressure-induced transition with pairing of the spins of its 3d electrons. A team from the University of California, Berkeley, Tel Aviv University, and Lawrence Livermore National Laboratory has used x-ray diffraction at very high pressure to investigate the effects of this transition on the elastic properties of magnesiowüstite (Mg1-xFex)O, the second most abundant mineral in the Earth's lower mantle. The new results suggest that the effect of the spin-pairing transition on magnesiowüstite can be large enough to require a partial revision of the most accepted model of the lower mantle composition.

164

Data:1eec25bb-cf63-4790-b9f2-a1e1d2c331bc | Open Energy Information  

Open Energy Info (EERE)

eec25bb-cf63-4790-b9f2-a1e1d2c331bc eec25bb-cf63-4790-b9f2-a1e1d2c331bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 27 Small Time-Of-Day General Electric Service (Distribution Service Primary Discount) Sector: Commercial Description: AVAILABLE for the entire electrical requirements at a single service location measured through one metering installation where the customer's maximum demand is less than 350 kW. Notwithstanding the applicability provisions of other rates, this rate is also available to fullrequirements customers that (i) prior to March 1, 1992, had a maximum monthly 30-minute demand in excess of 350 kW; (ii) had a maximum monthly 30-minute demand in the twelve billing periods prior to March 1, 1992, that equaled or exceeded twice the average of the customer's maximum monthly 30-minute demands during the same billing periods; (iii) as of March 1, 1992, had established, and had a reasonable expectation of continuing, a seasonal pattern of electrical usage approximating that established during the twelve billing periods prior to March 1, 1992; and (iv) had not discontinued taking service under this rate or Rate 30 after March 1, 1992.

165

Data:C5a45a0e-1e29-4d78-9693-1f864a250bb3 | Open Energy Information  

Open Energy Info (EERE)

a0e-1e29-4d78-9693-1f864a250bb3 a0e-1e29-4d78-9693-1f864a250bb3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: General Service-Single phase(Option S-Seasonal Pricing) Sector: Commercial Description: Demand Charges - KW billing demand shall be the maximum average kW demand for any period of fifteen consecutive minutes during the billing period. KVar billing demand will be determined by trigonometric calculation using the peak 15-minute kW billing demand and the average power factor for the period. Energy Charge Options - An account will be billed Energy Charges according to its choice of Option Y - Year-round pricing (the default option), Option S - Seasonal pricing, or Option T - Time-of-use pricing. Every twelve months an account is eligible to select a new Energy Charge Option. An account that elects seasonal or time-of-use pricing for the first time may elect a different option upon completion of a six month initial trial period. If a service location has changed hands and been billed under multiple Energy Charge Options during the previous twelve months, REMC reserves the right to require a new account to begin service for the initial twelve months under Option Y - Year-round pricing.

166

Data:0cd21cd6-6450-4e1a-868b-439897fc0c45 | Open Energy Information  

Open Energy Info (EERE)

cd21cd6-6450-4e1a-868b-439897fc0c45 cd21cd6-6450-4e1a-868b-439897fc0c45 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: 2012/05/23 End date if known: Rate name: OUTDOOR LIGHTING SCHEDULE-175 W Sodium (Recent) Sector: Lighting Description: AVAILABILITY AND APPLICABILITY: This schedule is available throughout the Cooperative's entire service area subject to the established Rules and Regulations of the Cooperative, and subject to a location where the lighting fixture and pole(s) can be installed. Outdoor lighting service is available only where there is reasonable assurance that the lighting service to be furnished will be on a permanent, continuous 12-month basis. The Cooperative reserves the right to refuse lighting service under this schedule where the installation, in the Cooperative's opinion, will not be permanent. Where the premises are occupied by a tenant, the Cooperative reserves the right to require the application for service to be made by the property owner. Billing will be sent the tenant however, the property owner shall be ultimately responsible for the payment of the bills. CHARACTER AND TYPE OF SERVICE: The Cooperative will install, own, operate and maintain at its expense the lighting fixture and related appurtenances. The lighting fixture shall be photoelectric or otherwise controlled so as to provide substantially dusk to dawn year around lighting service. Lighting fixtures will be installed only on the Cooperative's poles. All material used to install outdoor lighting shall remain the property of the Cooperative.

167

Network Observability Transitions  

E-Print Network (OSTI)

In the modeling, monitoring, and control of complex networks, a fundamental problem concerns the comprehensive determination of the state of the system from limited measurements. Using power grids as example networks, we show that this problem leads to a new type of percolation transition, here termed a {\\it network observability transition}, which we solve analytically for the configuration model. We also demonstrate a dual role of the network's community structure, which both facilitates optimal measurement placement and renders the networks substantially more sensitive to `observability attacks'. Aside from their immediate implications for the development of smart grids, these results provide insights into decentralized biological, social, and technological networks.

Yang, Yang; Motter, Adilson E; 10.1103/PhysRevLett.109.258701

2013-01-01T23:59:59.000Z

168

Regulators, Requirements, Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

169

VFP: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

170

BER Science Network Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

171

SULI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

172

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

173

Data:2788bedc-93f6-4372-8074-24506e1abfd4 | Open Energy Information  

Open Energy Info (EERE)

bedc-93f6-4372-8074-24506e1abfd4 bedc-93f6-4372-8074-24506e1abfd4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting GUS Shoebox MH 400 W Sector: Lighting Description: POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

174

Data:53065787-ed39-4a36-9d41-e1fd6372525b | Open Energy Information  

Open Energy Info (EERE)

ed39-4a36-9d41-e1fd6372525b ed39-4a36-9d41-e1fd6372525b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Small Commercial- Irrigation Cranberries Single Phase Inside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

175

Data:127816e7-1859-47bd-a958-d176457e1b86 | Open Energy Information  

Open Energy Info (EERE)

1859-47bd-a958-d176457e1b86 1859-47bd-a958-d176457e1b86 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Schedule IR-D Sector: Commercial Description: Available to Members of the Cooperative for irrigation service with a maximum monthly demand of less than 100 KW. The maximum monthly demand shall be the highest actual demand of any month, in a twelve month period, not an average for the twelve (12) month's monthly demand. Source or reference: http://www.delaware.coop/sites/default/files/IR.pdf Source Parent:

176

Data:92c61197-9248-44e1-bfc6-ff74026e4580 | Open Energy Information  

Open Energy Info (EERE)

-9248-44e1-bfc6-ff74026e4580 -9248-44e1-bfc6-ff74026e4580 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Mansfield, Massachusetts (Utility Company) Effective date: End date if known: Rate name: F-1 Firm Transmission Rate Sector: Commercial Description: Call for more information Source or reference: http://www.mansfieldelectric.com/services.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

177

Data:B7215715-2278-4894-a829-309431b04e1a | Open Energy Information  

Open Energy Info (EERE)

5715-2278-4894-a829-309431b04e1a 5715-2278-4894-a829-309431b04e1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuivre River Electric Coop Inc Effective date: End date if known: Rate name: Industrial (Over 500 kW w/ 60% Load Factor) Sector: Industrial Description: *Minimum Charge: $4.00 per KW per billing period of 12 month maximum demand Demand Charge: $9.25 per KW per billing period of averaged seasonal demand Source or reference: http://www.cuivreriverelectriccooperative.com.asp1-2.dfw1-1.websitetestlink.com/Commercial/CommercialAccountInformationService/tabid/88/Default.aspx Source Parent:

178

Data:B48880c3-5908-4e1c-bddd-966a22814256 | Open Energy Information  

Open Energy Info (EERE)

c3-5908-4e1c-bddd-966a22814256 c3-5908-4e1c-bddd-966a22814256 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Company Owned Street Lighting - DSV 100W (Granville) Pedestal Base Sector: Lighting Description: Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

179

Data:2467803b-58a1-454e-8988-f177cead6e1c | Open Energy Information  

Open Energy Info (EERE)

803b-58a1-454e-8988-f177cead6e1c 803b-58a1-454e-8988-f177cead6e1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: 188/D188 (Time of Use Residential, Voluntary, Multiple Periods) Sector: Residential Description: *less than 39,000 kilowatt hours (kWh) annually or *12,600 kWh for the months of June through September Fixed Monthly Charge= Service Charge+(Meter Charge * 30 days/month) .36=(.1*30)=.36+.3=.66 Source or reference: http://www.lipower.org/residential/account/service.html Source Parent: Comments Applicability

180

Requirements engineering with ORM  

Science Conference Proceedings (OSTI)

The number of IT project overspends and failures suggest that many IT projects do not conform to requirements. Despite decades of development the IT industry still seems to lack an effective method of ensuring that a project will be right first time. ...

Ken Evans

2005-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Requirements for Xenon International  

Science Conference Proceedings (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

182

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

183

Transitions for the People: Theory and Practice of `Transition' and  

E-Print Network (OSTI)

respond to the challenges, and opportunities, of Peak Oil and Climate Change?" [Transition Network 2008 change and peak-oil. There is much of interest here, for academics of sustainability transitions

Watson, Andrew

184

Alternative fuel transit buses: The Pierce Transit Success Story  

DOE Green Energy (OSTI)

The Pierce transit program for operating mass transit buses on compressed natural gas (CNG) is described. Cost, reliability, fuel efficiency, emission of combustion products, and future trends are discussed.

NONE

1996-10-01T23:59:59.000Z

185

NERSC Requirements Workshop November  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

186

Support Requirements for Synfuels  

E-Print Network (OSTI)

Producing synfuels from coal is technically feasible. Projects have a high probability of success but risks do exist (technical, marketing, environmental delays, regulatory and political changes, etc.). The various segments of the developing synfuels industry are identified. For each segment its characteristics, uncertainties and risks are discussed, as well as the type of support of guarantee required to develop this portion of the synfuels industry.

Hyland, M. J.

1981-01-01T23:59:59.000Z

187

BER Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

188

Data:572ae204-e0f0-44e1-a396-568fbdf1e3ef | Open Energy Information  

Open Energy Info (EERE)

ae204-e0f0-44e1-a396-568fbdf1e3ef ae204-e0f0-44e1-a396-568fbdf1e3ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Knoxville Utilities Board Effective date: 2013/06/01 End date if known: Rate name: SCHEDULE MSB Sector: Industrial Description: This rate, subject to availability from TVA, shall be available for firm electric power requirements where (a) a customer's currently effective onpeak or offpeak contract demand, whichever is higher, is greater than 5,000 kW but not more than 15,000 kW, and (b) the major use of electricity is for activities conducted at the delivery point serving that customer which are classified with a 2-digit Standard Industrial Classification Code between 20 and 39, inclusive, or classified with 2002 North American Industry Classification System (NAICS) code 5181, or 2007 NAICS codes 5182, 522320, and 541214; provided, however, customers qualifying for service under this schedule on the basis of such a NAICS code shall have an average monthly load factor of at least 80 percent during the preceding 12 months; provided further, however, that for the first 12 months of service to a new customer this load factor requirement shall be based on the customer's expected load factor for those 12 months as projected before the customer begins taking service; provided that the other applicable conditions specified below in this section are met. As used in the previous sentence "monthly load factor" shall mean a percentage calculated by dividing the total metered energy for a month by the product of the metered demand for that month and the number of clock hours in that month, exclusive of any hours during which power was unavailable due to an interruption or curtailment of the customer's service and of any hours in which the customer was unable to use power due to a Force Majeure event reasonably beyond the customer's control.

189

Data:3e9a9e5f-e1a6-4135-a52f-62c8aeeb9739 | Open Energy Information  

Open Energy Info (EERE)

e5f-e1a6-4135-a52f-62c8aeeb9739 e5f-e1a6-4135-a52f-62c8aeeb9739 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ameren Illinois Company Effective date: 2010/11/19 End date if known: Rate name: DS-1 and BGS-1 Zone 3 - Bundled Residential Delivery Service - Non-Space Heating Customers Sector: Residential Description: AVAILABILITY 1. Service under this Rate is available for any eligible Residential Customer, as determined by the Company, within the territory served by Company under this Schedule where power and energy used at Customer's Premises is for predominantly residential purposes, meeting the following criteria: a. Single-family dwelling or building containing two or more single-family units, where each unit is separately metered and used as a residence. b. Homes that are served by a single meter where usage is a combination of home and farm use. Usage shall be limited to service within the residence on the farm and that required for all general farming and agricultural purposes conducted on the premises served. Where separate meters are required to supply other operations, each additional meter shall be billed under the applicable Non-Residential rate. c. Recreation facilities consisting of summer cottages, homes, trailers or boat slips where service is individually metered and intended for continuous use by the same single family. RIDER EUA - ELECTRIC UNCOLLECTIBLE ADJUSTMENT - The purpose of this Rider is to provide for monthly adjustments to customer bills for any over-or-under recoveries of the Company's actual uncollectible expense amounts for a reporting year for each Rate Zone. Such adjustments are based on the incremental difference between actual uncollectible expense and the sum of (1) Commission-approved uncollectible amount included in the utility's rates that were in effect for the reporting year, as further defined by the formulas herein, and (2) the uncollectible amount recovered pursuant to the Commission authorized uncollectible factor included in rates for power supply service charges of Company. Rider EUA operates pursuant to Illinois Public Act 096-0033.

190

Direct Determination of the Magnetic Quadrupole Contribution to the Lyman-{alpha}{sub 1} Transition in a Hydrogenlike Ion  

Science Conference Proceedings (OSTI)

We report the observation of an interference between the electric dipole (E1) and the magnetic quadrupole (M2) amplitudes for the linear polarization of the Ly-{alpha}{sub 1} (2p{sub 3/2}{yields}1s{sub 1/2}) radiation of hydrogenlike uranium. This multipole mixing arises from the coupling of the ion to different multipole components of the radiation field. Our observation indicates a significant depolarization of the Ly-{alpha}{sub 1} radiation due to the E1-M2 amplitude mixing. It proves that a combined measurement of the linear polarization and of the angular distribution enables a very precise determination of the ratio of the E1 and the M2 transition amplitudes and the corresponding transition rates without any assumptions concerning the population mechanism for the 2p{sub 3/2} state.

Weber, G.; Stoehlker, Th. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Physikalisches Institut, Universitaet Heidelberg, 69120 Heidelberg (Germany); Helmholtz-Institut Jena, 07743 Jena (Germany); Braeuning, H.; Hess, S.; Kozhuharov, C.; Spillmann, U. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Surzhykov, A.; Maertin, R.; Winters, D. F. A. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Physikalisches Institut, Universitaet Heidelberg, 69120 Heidelberg (Germany); Brandau, C. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Institut fuer Atom- und Molekuelphysik, Justus-Liebig-Universitaet, 35392 Giessen (Germany); Fritzsche, S. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); FIAS Frankfurt Institute for Advanced Studies, 60438 Frankfurt am Main (Germany); Department of Physics, University of Oulu, 90014 Oulu (Finland); Geyer, S. [Institut fuer Angewandte Physik, Universitaet Frankfurt, 60438 Frankfurt am Main (Germany); Hagmann, S. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Institut fuer Kernphysik, Universitaet Frankfurt, 60438 Frankfurt am Main (Germany); Petridis, N. [Institut fuer Kernphysik, Universitaet Frankfurt, 60438 Frankfurt am Main (Germany); Reuschl, R. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); FIAS Frankfurt Institute for Advanced Studies, 60438 Frankfurt am Main (Germany); ExtreMe Matter Institute EMMI, 64291 Darmstadt (Germany); Trotsenko, S. [GSI Helmholtzzentrum fuer Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Helmholtz-Institut Jena, 07743 Jena (Germany)

2010-12-10T23:59:59.000Z

191

Alternative Fuels Data Center: Biodiesel Blend Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Blend Use Biodiesel Blend Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Blend Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Blend Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Blend Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Blend Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Blend Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Blend Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Blend Use Requirement Any diesel-powered vehicle the state, county or local government, school district, community college, public college or university, or mass transit

192

FE Transition Deliverables  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition Deliverables Transition Deliverables To: Cynthia Quarterman From: Charles Roy, FE-3 Date: 12/04/08 Re: On 12/03/08 Cynthia Quarterman requested a list of major projects with quick starts and job creation from Vic Der. Attached is a hard copy of this document. An electronic version of this document will be submitted to Cynthia Quarterman through the Office of Management. If there are any questions, please contact Charles Roy at 202-586-8977. ,^ (^// Cc~y Major Projects with Quick Starts & Jobs Creation Office of Clean Coal Summary of Projects and Job Creation The following table outlines the near-term possibilities for projects that capture and sequester carbon from coal-based systems. The potential jobs associated with these activities are listed along with likely construction and operation dates. Since the funding

193

Alternative Fuel Transit Buses  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

35th St. Craig Ave. Alt Blvd. Colucci Pkwy. Final Results from the National Renewable Energy Laboratory Vehicle Evaluation Program Final Results from the National Renewable Energy Laboratory Vehicle Evaluation Program N T Y A U E O F E N E R G D E P A R T M E N I T E D S T A T S O F A E R I C M Produced for the U.S. Department of Energy (DOE) by the National Renewable Energy Laboratory (NREL), a U.S. DOE national laboratory Transit Buses Alternative Fuel Alternative Fuel Final Results from the National Renewable Energy Laboratory (NREL) Vehicle Evaluation Program by Robert Motta, Paul Norton, and Kenneth Kelly, NREL Kevin Chandler, Battelle Leon Schumacher, University of Missouri Nigel Clark,West Virginia University October 1996 The authors wish to thank all the transit agencies that participated in this program.

194

BES Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

195

The Iron Spin Transition in the Earth's Lower Mantle  

NLE Websites -- All DOE Office Websites (Extended Search)

The Iron Spin Transition in the Earth's Lower Mantle Print The Iron Spin Transition in the Earth's Lower Mantle Print It is now known that the iron present in minerals of the lower mantle of the Earth undergoes a pressure-induced transition with pairing of the spins of its 3d electrons. A team from the University of California, Berkeley, Tel Aviv University, and Lawrence Livermore National Laboratory has used x-ray diffraction at very high pressure to investigate the effects of this transition on the elastic properties of magnesiowüstite (Mg1-xFex)O, the second most abundant mineral in the Earth's lower mantle. The new results suggest that the effect of the spin-pairing transition on magnesiowüstite can be large enough to require a partial revision of the most accepted model of the lower mantle composition.

196

The Iron Spin Transition in the Earth's Lower Mantle  

NLE Websites -- All DOE Office Websites (Extended Search)

The Iron Spin Transition in the Earth's Lower Mantle Print The Iron Spin Transition in the Earth's Lower Mantle Print It is now known that the iron present in minerals of the lower mantle of the Earth undergoes a pressure-induced transition with pairing of the spins of its 3d electrons. A team from the University of California, Berkeley, Tel Aviv University, and Lawrence Livermore National Laboratory has used x-ray diffraction at very high pressure to investigate the effects of this transition on the elastic properties of magnesiowüstite (Mg1-xFex)O, the second most abundant mineral in the Earth's lower mantle. The new results suggest that the effect of the spin-pairing transition on magnesiowüstite can be large enough to require a partial revision of the most accepted model of the lower mantle composition.

197

Economics of Transition in the Power Sector | Open Energy Information  

Open Energy Info (EERE)

Economics of Transition in the Power Sector Economics of Transition in the Power Sector Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Economics of Transition in the Power Sector Agency/Company /Organization: International Energy Agency Sector: Energy Topics: Market analysis, Policies/deployment programs Website: www.iea.org/papers/2010/economics_of_transition.pdf References: The Economics of Transition in the Power Sector[1] The power sector carries a considerably great burden of the CO2 emission reductions required to address climate change, a feature common to many scenarios of emissions abatement. These reductions will only be possible if existing plants are replaced with more efficient, and less-emitting types of plants over the coming decades. This report considers: the risk factors

198

The Iron Spin Transition in the Earth's Lower Mantle  

NLE Websites -- All DOE Office Websites (Extended Search)

The Iron Spin Transition in the Earth's Lower Mantle Print The Iron Spin Transition in the Earth's Lower Mantle Print It is now known that the iron present in minerals of the lower mantle of the Earth undergoes a pressure-induced transition with pairing of the spins of its 3d electrons. A team from the University of California, Berkeley, Tel Aviv University, and Lawrence Livermore National Laboratory has used x-ray diffraction at very high pressure to investigate the effects of this transition on the elastic properties of magnesiowüstite (Mg1-xFex)O, the second most abundant mineral in the Earth's lower mantle. The new results suggest that the effect of the spin-pairing transition on magnesiowüstite can be large enough to require a partial revision of the most accepted model of the lower mantle composition.

199

Gaseous diffusion plant transition from DOE to external regulation  

SciTech Connect

After many years of operation as government-owned/contractor-operated facilities, large portions of the gaseous diffusion plants (GDPs) at Portsmouth, Ohio, and Paducah, Kentucky, were leased to the United States Enrichment Corporation (USEC). These facilities are now certified by the U.S. Nuclear Regulatory Commission (NRC) and subject to oversight by the Occupational Safety and Health Administration (OSHA). The transition from DOE to NRC regulation was more difficult than expected. The original commitment was to achieve NRC certification in October 1995; however, considerably more time was required and transition-related costs escalated. The Oak Ridge Operations Office originally estimated the cost of transition at $60 million; $240 million has been spent to date. The DOE`s experience in transitioning the GDPs to USEC operation with NRC oversight provides valuable lessons (both positive and negative) that could be applied to future transitions.

Dann, R.K.; Crites, T.R.; Rahm-Crites, L.K. [Lawrence Livermore National Lab., CA (United States)

1997-12-01T23:59:59.000Z

200

Data:08e1a257-8e99-4f1c-ab81-a23d7f44e1eb | Open Energy Information  

Open Energy Info (EERE)

a257-8e99-4f1c-ab81-a23d7f44e1eb a257-8e99-4f1c-ab81-a23d7f44e1eb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Public Highway Lighting- Special Sector: Lighting Description: This rate is applicable only to all series or multiple street or highway illumination, including ornamental and whiteway lighting where all fixtures, supporting poles or structures, circuit breakers and relays, circuit wiring, and initial lamps, are owned, installed, and maintained by the Customer. Service hereunder shall be subject to the additional terms and conditions set forth in Special Rules and Regulations of the Utility governing application of this rate.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:Da3e16f1-5bdb-489f-8dd3-e1a1ca02e6b3 | Open Energy Information  

Open Energy Info (EERE)

Da3e16f1-5bdb-489f-8dd3-e1a1ca02e6b3 Da3e16f1-5bdb-489f-8dd3-e1a1ca02e6b3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hancock-Wood Electric Coop Inc Effective date: 2009/10/01 End date if known: Rate name: LPS Rate 12KI (Kelleys Island) Sector: Industrial Description: This schedule is available systemwide to all consumers who use standard single or 3phase service and who guarantee a monthly billing demand of not less than 50 kVA. Service furnished under this schedule will be by contract, on a 12months nonseasonal basis and in accordance with Cooperative's General Terms & Conditions or subsequent revisions thereof. Where substation capacity in excess of 150 kVA is required to supply consumer's existing and probably future requirements, Cooperative reserves the right to require consumer to install the necessary complete substation equipment.

202

Concerted Allosteric Transition Highlight  

NLE Websites -- All DOE Office Websites (Extended Search)

combined use of x-ray crystallography and solution small angle x-ray scattering has enabled a research collaboration involving scientists from Boston College and SSRL to provide structural evidence supporting a 30-year old model accounting for the cooperative binding of ligands to allosteric proteins and enzymes - a function central to physiology and cellular processes. combined use of x-ray crystallography and solution small angle x-ray scattering has enabled a research collaboration involving scientists from Boston College and SSRL to provide structural evidence supporting a 30-year old model accounting for the cooperative binding of ligands to allosteric proteins and enzymes - a function central to physiology and cellular processes. Over 30 years ago, two major models were developed to account for the cooperativity observed in oligomeric allosteric proteins such as hemoglobin, the oxygen carrier protein in blood: the concerted model, in which a protein has only two ”all-or-none” global states, vs. the sequential model that allows a number of different global conformational/energy states. Both, however, are based on just two local states of building blocks (subunits) in close analogy to magnetic spin states. In either model, a transition of one or more protein subunits leads to the global transition, in the case of hemoglobin, from the oxygen-releasing form to the oxygen-binding form, depending on the oxygen level in the blood stream. The concerted model, based on highly positive cooperativity, resembles the ferromagnetic phase transition, in which only two spin states account for the sharp phase transition between two global states. The sequential model, on the other hand, permits mixture of active and inactive subunits. Macol et al., constructed a version of an allosteric enzyme E. coli aspartate transcarbamoylase, which is composed of six equivalent catalytic monomers and six equivalent regulatory monomers in its native form, in such a way that only one of the six catalytic monomers could bind a substrate analog. Using solution x-ray scattering data recorded at BL4-2 to monitor the global structural state, they provided the first structural evidence that the transition of only one catalytic monomer is sufficient to transform the entire enzyme into the highly active state, lending strong support to the concerted model.

203

Data:E1c4f963-4dd4-4cf9-8fc5-af4257ba4b60 | Open Energy Information  

Open Energy Info (EERE)

E1c4f963-4dd4-4cf9-8fc5-af4257ba4b60 E1c4f963-4dd4-4cf9-8fc5-af4257ba4b60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 3 - 25kW or more NSS (Non-Retail) Primary Voltage Sector: Industrial Description: APPLICABLE TO THE USE OF SERVICE FOR: Primary Service for any customer with a demand of 25 kilowatts or more but less than 500 kilowatts. Flat rate Adjustments = Transition Charge+MFC. Reactive Charge: $0.00078/kWh. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_3.pdf

204

Repository seals requirements study  

SciTech Connect

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. This report presents the results of a repository sealing requirements study. Sealing is defined as the permanent closure of the shafts, ramps, and exploratory boreholes. Sealing includes those components that would reduce potential inflows above the repository, or that would divert flow near the repository horizon to allow vertical infiltration to below the repository. Sealing of such features as emplacement drifts was not done in this study because the current capability to calculate fracture flow into the drifts is not sufficiently mature. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

205

Site Transition Process Upon Cleanup Completion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion More...

206

Transit Infrastructure Finance Through Station Location Auctions  

E-Print Network (OSTI)

as the primary transit infrastructure finance method.Paper 2009-04 Transit Infrastructure Finance Through StationWP-2009-04 Transit Infrastructure Finance Through Station

Ian Carlton

2009-01-01T23:59:59.000Z

207

Evaluation Methods for Rail Transit Projects  

E-Print Network (OSTI)

Evaluation Methodsfor Rail Transit Projects Robert AEvaluation Methods for Rail Transit Projects Robert A.pie EVALUATION METHODS FOR RAIL TRANSIT PROJECTS ROBERT

Johnston, Robert A.; DeLuchi, Mark A.

1989-01-01T23:59:59.000Z

208

Transition Zone Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Transition Zone Geothermal Region (Redirected from Transition Zone) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Transition Zone Geothermal Region edit Details...

209

Transition of Sites from Environmental Management Memorandum...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from...

210

X-ray Transition Energies Search Form  

Science Conference Proceedings (OSTI)

[skip navigation] X-ray Transition Energies Database Main Page Search for X-ray transition energies by element(s), transition ...

211

Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results  

DOE Green Energy (OSTI)

This report provides an evaluation of three prototype fuel cell-powered transit buses operating at AC Transit in Oakland, California, and six baseline diesel buses similar in design to the fuel cell buses.

Chandler, K.; Eudy, L.

2007-03-01T23:59:59.000Z

212

DOE Hydrogen Analysis Repository: Transition to Hydrogen Transportation  

NLE Websites -- All DOE Office Websites (Extended Search)

Transition to Hydrogen Transportation Fuel Transition to Hydrogen Transportation Fuel Project Summary Full Title: A Smooth Transition to Hydrogen Transportation Fuel Project ID: 87 Principal Investigator: Gene Berry Brief Description: This project contrasts the options of decentralized production using the existing energy distribution network, and centralized production of hydrogen with a large-scale infrastructure. Keywords: Infrastructure; costs; hydrogen production Purpose The case for hydrogen-powered transportation requires an assessment of present and prospective methods for producing, storing, and delivering hydrogen. This project examines one potential pathway: on-site production of hydrogen to fuel light-duty vehicles. Performer Principal Investigator: Gene Berry Organization: Lawrence Livermore National Laboratory (LLNL)

213

TRANSITION CROSSING FOR THE BNL SUPER NEUTRINO BEAM FACILITY.  

SciTech Connect

The super neutrino beam facility proposed at the Brookhaven National Laboratory requires proton beams to cross the transition energy in the AGS to reach 1 MW beam power at top energy. High intensity beams are accelerated at a fast repetition rate. Upon transition crossing, such high intensity bunches of large momentum spreads suffer from strong nonlinear chromatic effects and self-field effects. Using theoretical and experimental methods, we determine the impact of these effects and the effectiveness of transition-jump compensation schemes, and determine the optimum crossing scenario for the super neutrino beam facility.

WEI,J.TSOUPAS,N.

2004-07-05T23:59:59.000Z

214

Repository seals requirement study  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

215

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

216

Requirements Engineering for Digital Upgrades: Specification, Analysis, and Tracking  

Science Conference Proceedings (OSTI)

As nuclear power plants upgrade their instrumentation and control (I&C) systems with digital equipment to continue meeting safety and reliability requirements while controlling operating costs, the transition to the new technology has brought new challenges in properly specifying and confirming the correct performance of digital systems and devices. This guideline describes an approach that utilities can use to refine and improve their processes for developing and verifying requirements for digital upgra...

1997-12-09T23:59:59.000Z

217

Data:47773204-f4e1-4738-be97-7974e4bb2706 | Open Energy Information  

Open Energy Info (EERE)

204-f4e1-4738-be97-7974e4bb2706 204-f4e1-4738-be97-7974e4bb2706 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lake Mills Light & Water Effective date: 2009/06/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0767 per kilowatt-hour.

218

Data:52cda01e-1d99-4318-a989-fae04208acf6 | Open Energy Information  

Open Energy Info (EERE)

cda01e-1d99-4318-a989-fae04208acf6 cda01e-1d99-4318-a989-fae04208acf6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 5,000kW Demand 8am-8pm Transformer Ownership Discount (2,300-15,000 volts) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

219

Data:Bdced3e1-cdae-4473-ad90-ce7891a285c5 | Open Energy Information  

Open Energy Info (EERE)

Bdced3e1-cdae-4473-ad90-ce7891a285c5 Bdced3e1-cdae-4473-ad90-ce7891a285c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Gs-1 General Service Three Phase less than 75kW Demand Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

220

Data:379427be-8e32-4394-9464-96abcc06d0e1 | Open Energy Information  

Open Energy Info (EERE)

7be-8e32-4394-9464-96abcc06d0e1 7be-8e32-4394-9464-96abcc06d0e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:2741fd13-da31-4733-b0fb-58e1a3924216 | Open Energy Information  

Open Energy Info (EERE)

fd13-da31-4733-b0fb-58e1a3924216 fd13-da31-4733-b0fb-58e1a3924216 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Ms-1 Street Lighting Service Ornamental 150 W HPS (utility owned and maintained) Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

222

Effects Of a Transition to a Hydrogen Economy on Employment in the United States: Report to Congress  

NLE Websites -- All DOE Office Websites (Extended Search)

Effects of a Transition to a Effects of a Transition to a Hydrogen Economy on Employment in the United States Report to Congress July 2008 2 3 EFFECTS OF TRANSITION TO A HYDROGEN ECONOMY ON EMPLOYMENT IN THE UNITED STATES TABLE OF CONTENTS EXECUTIVE SUMMARY...............................................................................4 E.1 Background to the Study.........................................................................4 E.2 Methodology.......................................................................................4 E.3 Scenarios Shaping Future Hydrogen Markets ........................................................ 5 E.4 Employment Creation and Replacement at the National Level ............................ 6 E.5 Regional Variations in Economic Impacts ............................................................... 7

223

ASCR Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

224

Transit, Employment and Women on Welfare  

E-Print Network (OSTI)

reported transit and car usage and on the numberof timescar as an Important factor m determining transit usage Forcar and higher levels of transit access Theestimated coefficients of the multlvanateloglt regressions for transit usage

Ong, Paul M.; Houston, Douglas

2001-01-01T23:59:59.000Z

225

Transit, Employment and Women on Welfare  

E-Print Network (OSTI)

reported transit and car usage and on the numberof timescar as an Important factor m determining transit usage Forcar and higher levels of transit access Theestimated coefficients of the multlvanateloglt regressions for transit usage

Ong, Paul M.; Houston, Douglas

2002-01-01T23:59:59.000Z

226

Stripe Disordering Transition  

E-Print Network (OSTI)

Abstract. We have recently begun Monte Carlo simulations of the dynamics of stripe phases in the cuprates. A simple model of spinodal decomposition of the holes allows us to incorporate Coulomb repulsion and coherency strains. We find evidence for a possible stripe disordering transition, at a temperature below the pseudogap onset. Experimental searches for such a transition can provide constraints for models of stripe formation. The relationship between stripe phases and the pseudogap in underdoped cuprates is not well understood. In our model [1–3] the pseudogap is primary. It represents an instability of the hole Fermi liquid driven by Van Hove nesting [4]. However, there is a competition of instabilities, with an antiferromagnet (or flux phase [5–7]) at half filling and a charge-density wave (CDW) at the bare Van Hove singularity (VHS) near optimal doping. This competition leads to a classical phase separation of the holes – two minima in the free energy [8,1]. This is restricted to a nanoscopic scale by long-range Coulomb effects, leading to phases similar to the experimentally observed stripe phases [9].

R. S. Markiewicz; M. T. Vaughn

1999-01-01T23:59:59.000Z

227

309 Building transition plan  

Science Conference Proceedings (OSTI)

The preparation for decontamination and decommissioning (transition) of the 309 Building is projected to be completed by the end of the fiscal year (FY) 1998. The major stabilization and decontamination efforts include the Plutonium Recycle Test Reactor (PRTR), fuel storage and transfer pits, Transfer Waste (TW) tanks and the Ion Exchange Vaults. In addition to stabilizing contaminated areas, equipment, components, records, waste products, etc., will be dispositioned. All nonessential systems, i.e., heating, ventilation, and air conditioning (HVAC), electrical, monitoring, fluids, etc., will be shut down and drained/de-energized. This will allow securing of the process, laboratory, and office areas of the facility. After that, the facility will be operated at a level commensurate with its surveillance needs while awaiting D&D. The implementation costs for FY 1995 through FY 1998 for the transition activities are estimated to be $1,070K, $2,115K, $2,939K, and $4,762K, respectively. Costs include an assumed company overhead of 20% and a 30% out year contingency.

Graves, C.E.

1994-08-31T23:59:59.000Z

228

Building America Expert Meeting Report: Transitioning Traditional...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to...

229

Low-energy E1 strength in select nuclei: Possible constraints on the neutron skins and the symmetry energy  

E-Print Network (OSTI)

Correlations between low-lying electric dipole (E1) strength and neutron skin thickness are systematically investigated with the fully self-consistent random-phase approximation using the Skyrme energy functionals. The presence of strong correlation among these quantities is currently under dispute. We find that the strong correlation is present in properly selected nuclei, namely in spherical neutron-rich nuclei in the region where the neutron Fermi levels are located at orbits with low orbital angular momenta. The significant correlation between the fraction of the energy-weighted sum value and the slope of the symmetry energy is also observed. The deformation in the ground state seems to weaken the correlation.

Tsunenori Inakura; Takashi Nakatsukasa; Kazuhiro Yabana

2013-06-13T23:59:59.000Z

230

Alternative Fuels at AC Transit  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternative Fuels at AC Transit Alternative Fuels at AC Transit Speaker(s): Jaimie Levin Date: November 1, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Eve Edelson Mr. Levin will discuss AC Transit's range of environmental technology initiatives, including: zero emission fuel cell transit buses; state-of-the-art, high-capacity, hydrogen fueling stations; solar energy systems; and stationary solid oxide fuel cell power generators. AC Transit has the largest fleet of fuel cell buses in the United States, featuring fuel cell systems with more than 10,000 hours of continuous operation without any failures or power degradation. Their fuel cell fleet has logged more than 400,000 miles of service and carried in excess of one million passengers. Come hear what AC Transit has learned, where they're headed,

231

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

232

Transits and Occultations  

E-Print Network (OSTI)

When we are fortunate enough to view an exoplanetary system nearly edge-on, the star and planet periodically eclipse each other. Observations of eclipses (transits and occultations) provide a bonanza of information that cannot be obtained from radial-velocity data alone, such as the relative dimensions of the planet and its host star, as well as the orientation of the planet's orbit relative to the sky plane and relative to the stellar rotation axis. The wavelength-dependence of the eclipse signal gives clues about the the temperature and composition of the planetary atmosphere. Anomalies in the timing or other properties of the eclipses may betray the presence of additional planets or moons. Searching for eclipses is also a productive means of discovering new planets. This chapter reviews the basic geometry and physics of eclipses, and summarizes the knowledge that has been gained through eclipse observations, as well as the information that might be gained in the future.

Winn, Joshua N

2010-01-01T23:59:59.000Z

233

Transit, Density, and Residential Satisfaction  

E-Print Network (OSTI)

High-Speed Rail," Fourteenth Australasian Transport ResearchRail Transit Stations and Property Values: A Hedonic Price Approach," in Transportation Research

Shaw, John G.

1994-01-01T23:59:59.000Z

234

Nonextensive Nuclear Liquid-Gas Phase Transition  

E-Print Network (OSTI)

We study an effective relativistic mean-field model of nuclear matter with arbitrary proton fraction at finite temperature in the framework of nonextensive statistical mechanics, characterized by power-law quantum distributions. We investigate the presence of thermodynamic instability in a warm and asymmetric nuclear medium and study the consequent nuclear liquid-gas phase transition by requiring the Gibbs conditions on the global conservation of baryon number and electric charge fraction. We show that nonextensive statistical effects play a crucial role in the equation of state and in the formation of mixed phase also for small deviations from the standard Boltzmann-Gibbs statistics.

A. Lavagno; D. Pigato

2013-07-07T23:59:59.000Z

235

Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results  

DOE Green Energy (OSTI)

This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

Chandler, K.; Eudy, L.

2008-10-01T23:59:59.000Z

236

Pages that link to "Data:08abf60e-0b5a-4b5f-82e1-92a117eef666...  

Open Energy Info (EERE)

5f-82e1-92a117eef666: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Seattle, Washington (Utility Company) ( links) View (previous 50 | next 50) (20 | 50 |...

237

Pages that link to "Data:72677b62-a1d3-449b-8b22-1a263e1c55f6...  

Open Energy Info (EERE)

-449b-8b22-1a263e1c55f6: View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500) City of Oak Ridge, Tennessee (Utility Company) ( links) View (previous 50 | next 50) (20 |...

238

Data:025f3281-744e-4023-8265-188c7c16e1a6 | Open Energy Information  

Open Energy Info (EERE)

81-744e-4023-8265-188c7c16e1a6 81-744e-4023-8265-188c7c16e1a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kansas City Power & Light Co Effective date: 2012/02/01 End date if known: Rate name: Schedule SGS Small General Service >25kW Sector: Commercial Description: AVAILABILITY: For electric service through one meter to a customer using electric service for purposes other than those Included in the availability provisions of the Residential Service Rate Schedule. At the Company's discretion, service may be provided through more than one meter where it Is economical for the Company to do so. For electric service through a separately metered circuit for water heating connected prior to March 1, 1999. For secondary electric service through a separately metered circuit for electric space heating purposes. Electric space heating equipment may be supplemented by or used as a supplement to wood burning fireplaces, wood burning stoves, acllve or passive solar heating, and in conjunction with fossil fuels where the combination of energy sources results in a net economic benefit to the customer Electric space heating equipment shall be permanently installed, thermostatically controlled, and of a size and design approved by the Company. In addition to the electric space heating equipment, only permanently installed all electric equipment, us&j to cool or air condition the same space which is electrically heated, may be connected to the separately metered circuit Standby, breakdown, or supplementary service will not be supplied under this schedule unless the customer first enters into a special contract which includes technical and safety requirements. These requirements, and the associated interconnection costs, shall be reasonable and assessed on a nondiscriminatory basis with respect to other customers with similar load characteristics. Seasonal service will not be supplied under this schedule. Temporary service supplied under this schedule will be connected and disconnected in accordance with the General Rules and Regulations. APPLICABILITY: Applicable to multiple-occupancy buildings when the tenants or occupants of the building are furnished with electric service on a rent Inclusion basis and the customer qualifies under Sections 9.03 - 9.08 of Company's General Rules and Regulations pertaining to Metering. This rate also will be applied to the combined use of a customer at the premises where two or more classes of service (such as one-phase and three-phase services) to the customer at such premises are measured by separate meters, but only in the case of customers connected prior to August 25, 1976. Monthly Maximum Demand will be computed as the sum of the individual meters' monthly maximum 30- minute interval demand. Customers with more than one class of service connected on or after August 25, 1976 will be billed separ^itely for each dass of service. TERM OF CONTRACT: Contracts under this schedule shall be for a period of not less than one year from the effective date thereof, except in the case of temporary service.

239

Requirements dependencies: the emergence of a requirements network  

Science Conference Proceedings (OSTI)

We believe that the requirements at the leaf-node level of the requirements tree structure cannot be viewed in isolation and that dependencies between them exist. We pursued this notion in order to find a coherent set of requirement dependencies that ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

240

N reactor standby program plan: Part 2, Transition to standby  

Science Conference Proceedings (OSTI)

The N Reactor Standby Program is the Westinghouse Hanford Company (WHC) program to prepare the N Reactor for cold standby in a cost effective and quality manner with a primary emphasis on safety. The N Reactor Standby Program is comprised of five parts or subprograms, of which the Transition to Standby Program is part two. Transition to Standby is that part of the overall program that encompasses the on-going operational and maintenance activities required to maintain safe control of the reactor and support facilities until their layup is complete. The Transition to Standby Program Plan has been developed to outline the program plans, baselines, and controls to be employed in the management of the Transition to Standby Program. This plan also defines the roles and responsibilities of the major program participants.

Slinn, S.A.

1988-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Water drives peptide conformational transitions  

E-Print Network (OSTI)

Transitions between metastable conformations of a dipeptide are investigated using classical molecular dynamics simulation with explicit water molecules. The distribution of the surrounding water at different moments before the transitions and the dynamical correlations of water with the peptide's configurational motions indicate that water is the main driving force of the conformational changes.

Nerukh, Dmitry

2011-01-01T23:59:59.000Z

242

Data:17842944-cb2f-43e1-b10e-79f610da3959 | Open Energy Information  

Open Energy Info (EERE)

44-cb2f-43e1-b10e-79f610da3959 44-cb2f-43e1-b10e-79f610da3959 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/07/01 End date if known: Rate name: NON-RESIDENTIAL SEASONAL SERVICE Three Phase Sector: Commercial Description: AVAILABILITY Available in all territory served by the Cooperative, subject to the established Service Rules and Regulations of the Cooperative. APPLICABILITY This schedule is applicable to all non-residential seasonal service, including all bulk barns regardless of demand and irrigation accounts not on time-of-use rates. RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD RIDER APPLICABILITY Service under this Rider is applicable to all retail consumers of the Cooperative for the recovery of the Cooperative's incremental costs associated with meeting their Renewable Energy Standard Portfolio (REPS) pursuant to North Carolina General Statute 62-133.8 and NCUC Rule R8-67, along with costs related to the Cooperative's demand-side management and energy efficiency (EE) programs pursuant to North Carolina General Statute 62-133.9 and NCUC Rule R8-68. This Rider only applies to the Cooperative's demand-side management and energy efficiency programs that were implemented after January 1, 2007 and have been approved by the North Carolina Utilities Commission (NCUC). The REPS and EE rates shown in this Rider are not included in the Cooperative's individual retail rate schedules and therefore, will be applied to the bill as calculated under the applicable rate. Commercial rate : REPS Rate $2.30 EE Rate $1.87 Total Monthly Rate 4.17 (INCLUDED IN THE FIXED MONTHLY CHARGE) The provisions of the Schedule with which this Rider is used are modified only as shown herein. Service rendered under this Rider is subject to the provisions of the Cooperative's Service Rules and Regulations on file with the state regulatory commission.

243

Washington Metropolitan Area Transit Authority: Compressed Natural Gas Transit Bus Evaluation  

DOE Green Energy (OSTI)

Evaluates compressed natural gas (CNG) powered transit buses at Washington Metropolitan Area Transit Authority (WMATA), providing a comparison between them and standard diesel transit buses.

Chandler, K.; Eberts, E.; Melendez, M.

2006-04-01T23:59:59.000Z

244

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

245

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

246

Building security requirements with CLASP  

Science Conference Proceedings (OSTI)

Traditionally, security requirements have been derived in an ad hoc manner. Recently, commercial software development organizations have been looking for ways to produce effective security requirements.In this paper, we show how to build security ... Keywords: application security, security process, security requirements

John Viega

2005-07-01T23:59:59.000Z

247

Evidence for the Direct Two-Photon Transition from $\\psi'$ to $J/\\psi$  

E-Print Network (OSTI)

The two-photon transition $\\psi' \\to \\gamma\\gamma J/\\psi$ is studied in a sample of 106 million $\\psi'$ decays collected by the BESIII detector. The branching fraction is measured to be $(3.3\\pm0.6(\\unit{stat})^{+0.8}_{-1.1}(\\unit{syst})) \\times10^{-4}$ using $J/\\psi \\to e^+e^-$ and $J/\\psi \\to \\mu^+\\mu^-$decays. This work represents the first measurement of a two-photon transition among charmonium states. The orientation of the $\\psi'$ decay plane and the $J/\\psi$ polarization in this decay are also studied. In addition, the product branching fractions of sequential $E1$ transitions $\\psi'\\to\\gamma\\chi_{cJ}$, $\\chi_{cJ}\\to\\gamma J/\\psi (J=0,1,2)$ are reported.

Ablikim, M; Ambrose, D J; An, F F; An, Q; An, Z H; Bai, J Z; Ferroli, R B; Ban, Y; Becker, J; Berger, N; Bertani, M B; Bian, J M; Boger, E; Bondarenko, O; Boyko, I; Briere, R A; Bytev, V; Cai, X; Calcaterra, A C; Cao, G F; Chang, J F; Chelkov, G; Chen, G; Chen, H S; Chen, J C; Chen, M L; Chen, S J; Chen, Y; Chen, Y B; Cheng, H P; Chu, Y P; Cronin-Hennessy, D; Dai, H L; Dai, J P; Dedovich, D; Deng, Z Y; Denig, A; Denysenko, I; Destefanis, M; Ding, W M; Ding, Y; Dong, L Y; Dong, M Y; Du, S X; Fang, J; Fang, S S; Fava, L; Feldbauer, F; Feng, C Q; Fu, C D; Fu, J L; Gao, Y; Geng, C; Goetzen, K; Gong, W X; Gradl, W; Greco, M; Gu, M H; Gu, Y T; Guan, Y H; Guo, A Q; Guo, L B; Guo, Y P; Han, Y L; Hao, X Q; Harris, F A; He, K L; He, M; He, Z Y; Held, T; Heng, Y K; Hou, Z L; Hu, H M; Hu, J F; Hu, T; Huang, B; Huang, G M; Huang, J S; Huang, X T; Huang, Y P; Hussain, T; Ji, C S; Ji, Q; Ji, X B; Ji, X L; Jia, L K; Jiang, L L; Jiang, X S; Jiao, J B; Jiao, Z; Jin, D P; Jin, S; Jing, F F; Kalantar-Nayestanaki, N; Kavatsyuk, M; Kuehn, W; Lai, W; Lange, J S; Leung, J K C; Li, C H; Li, Cheng; Li, Cui; Li, D M; Li, F; Li, G; Li, H B; Li, J C; Li, K; Li, Lei; Li, N B; Li, Q J; Li, S L; Li, W D; Li, W G; Li, X L; Li, X N; Li, X Q; Li, X R; Li, Z B; Liang, H; Liang, Y F; Liang, Y T; Liao, G R; Liao, X T; Liu, B J; Liu, B J; Liu, C L; Liu, C X; Liu, C Y; Liu, F H; Liu, Fang; Liu, Feng; Liu, H; Liu, H B; Liu, H H; Liu, H M; Liu, H W; Liu, J P; Liu, Kun; Liu, Kai; Liu, K Y; Liu, P L; Liu, S B; Liu, X; Liu, X H; Liu, Y B; Liu, Y; Liu, Z A; Liu, Zhiqiang; Liu, Zhiqing; Loehner, H; Lu, G R; Lu, H J; Lu, J G; Lu, Q W; Lu, X R; Lu, Y P; Luo, C L; Luo, M X; Luo, T; Luo, X L; Lv, M; Ma, C L; Ma, F C; Ma, H L; Ma, Q M; Ma, S; Ma, T; Ma, X Y; Ma, Y; Maas, F E; Maggiora, M; Malik, Q A; Mao, H; Mao, Y J; Mao, Z P; Messchendorp, J G; Min, J; Min, T J; Mitchell, R E; Mo, X H; Morales, C Morales; Motzko, C; Muchnoi, N Yu; Nefedov, Y; Nicholson, C; Nikolaev, I B; Ning, Z; Olsen, S L; Ouyang, Q; Pacetti, S P; Park, J W; Pelizaeus, M; Peters, K; Ping, J L; Ping, R G; Poling, R; Prencipe, E; Pun, C S J; Qi, M; Qian, S; Qiao, C F; Qin, X S; Qin, Y; Qin, Z H; Qiu, J F; Rashid, K H; Rong, G; Ruan, X D; Sarantsev, A; Schulze, J; Shao, M; Shen, C P; Shen, X Y; Sheng, H Y; Shepherd, M R; Song, X Y; Spataro, S; Spruck, B; Sun, D H; Sun, G X; Sun, J F; Sun, S S; Sun, X D; Sun, Y J; Sun, Y Z; Sun, Z J; Sun, Z T; Tang, C J; Tang, X; Thorndike, E H; Tian, H L; Toth, D; Ulrich, M U; Varner, G S; Wang, B; Wang, B Q; Wang, K; Wang, L L; Wang, L S; Wang, M; Wang, P; Wang, P L; Wang, Q; Wang, Q J; Wang, S G; Wang, X F; Wang, X L; Wang, Y D; Wang, Y F; Wang, Y Q; Wang, Z; Wang, Z G; Wang, Z Y; Wei, D H; Weidenkaff, P; Wen, Q G; Wen, S P; Werner, M W; Wiedner, U; Wu, L H; Wu, N; Wu, S X; Wu, W; Wu, Z; Xia, L G; Xiao, Z J; Xie, Y G; Xiu, Q L; Xu, G F; Xu, G M; Xu, H; Xu, Q J; Xu, X P; Xu, Y; Xu, Z R; Xue, F; Xue, Z; Yan, L; Yan, W B; Yan, Y H; Yang, H X; Yang, T; Yang, Y; Yang, Y X; Ye, H; Ye, M; Ye, M H; Yu, B X; Yu, C X; Yu, J S; Yu, S P; Yuan, C Z; Yuan, W L; Yuan, Y; Zafar, A A; Zallo, A Z; Zeng, Y; Zhang, B X; Zhang, B Y; Zhang, C C; Zhang, D H; Zhang, H H; Zhang, H Y; Zhang, J; Zhang, J G; Zhang, J Q; Zhang, J W; Zhang, J Y; Zhang, J Z; Zhang, L; Zhang, S H; Zhang, T R; Zhang, X J; Zhang, X Y; Zhang, Y; Zhang, Y H; Zhang, Y S; Zhang, Z P; Zhang, Z Y; Zhao, G; Zhao, H S; Zhao, J W; Zhao, K X; Zhao, Lei; Zhao, Ling; Zhao, M G; Zhao, Q; Zhao, S J; Zhao, T C; Zhao, X H; Zhao, Y B; Zhao, Z G; Zhemchugov, A; Zheng, B; Zheng, J P; Zheng, Y H; Zheng, Z P; Zhong, B; Zhong, J; Zhou, L; Zhou, X K; Zhou, X R; Zhu, C; Zhu, K; Zhu, K J; Zhu, S H; Zhu, X L; Zhu, X W; Zhu, Y M; Zhu, Y S; Zhu, Z A; Zhuang, J; Zou, B S; Zou, J H; Zuo, J X

2012-01-01T23:59:59.000Z

248

Data:A3a8d802-1d32-4c6c-9e1f-e583306bc162 | Open Energy Information  

Open Energy Info (EERE)

d802-1d32-4c6c-9e1f-e583306bc162 d802-1d32-4c6c-9e1f-e583306bc162 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACTON - Residential R-4 (A5/A6) Sector: Residential Description: Upon written application, this rate is available for service in an edifice set apart exclusively for public worship and all domestic uses to Customers who take all of their electric service requirements hereunder in a single private dwelling, in an individual apartment or in a residential condominium. Service under this rate to residential condominiums is available to the extent

249

Data:7f9d9de7-3e1a-47c4-9d50-638b4ac622b8 | Open Energy Information  

Open Energy Info (EERE)

d9de7-3e1a-47c4-9d50-638b4ac622b8 d9de7-3e1a-47c4-9d50-638b4ac622b8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Austin, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Interruptible Service Bulk Power Credit Sector: Commercial Description: AVAILABILITY: At all locations for customers who qualify and where facilities of adequate capacity and suitable voltage are adjacent to the premises to be served. Additional contractual arrangements may be required prior to service being furnished. Austin Utilities reserves the right to limit the amount of interruptible load taken by a customer and the total amount of interruptible load on the Austin Utility system.

250

Data:F0a297f6-7128-4faf-ac4f-cf0b2a21e1dd | Open Energy Information  

Open Energy Info (EERE)

a297f6-7128-4faf-ac4f-cf0b2a21e1dd a297f6-7128-4faf-ac4f-cf0b2a21e1dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/07/01 End date if known: Rate name: RESIDENTIAL TIME-OF-USE SERVICE Single Phase Sector: Residential Description: AVAILABILITY Available in all territory served by the Cooperative, subject to the established Service Rules and Regulations of the Cooperative. APPLICABILITY This schedule is applicable to and available for residential use only, or for uses incidental thereto, to be supplied through one meter to each residence, apartment unit, or farm. The capacity of individual motors served under this classification shall not exceed 10 H.P. The Cooperative may require a written contract for any requested three-phase service.

251

Data:3c12a91f-c90f-4e1e-9d1e-7f1372e6b177 | Open Energy Information  

Open Energy Info (EERE)

1f-c90f-4e1e-9d1e-7f1372e6b177 1f-c90f-4e1e-9d1e-7f1372e6b177 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Secondary Service - Greater than 10 kVa, IDR Metered, greater than 2000 kVa (TC-LOS-A) - Muni Discount Rate Sector: Commercial Description: Delivery Service will be single-phase, 60 hertz, at a standard secondary voltage. Delivery Service will be metered using Company's standard watt-hour Meter provided for this type of Delivery Service. Any other metering option(s) will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, in this Tariff.

252

Data Requirements from NERSC Requirements Reviews Richard Gerber...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. Over the...

253

Phase Transition in Reconstituted Chromatin  

E-Print Network (OSTI)

By observing reconstituted chromatin by fluorescence microscopy (FM) and atomic force microscopy (AFM), we found that the density of nucleosomes exhibits a bimodal profile, i.e., there is a large transition between the dense and dispersed states in reconstituted chromatin. Based on an analysis of the spatial distribution of nucleosome cores, we deduced an effective thermodynamic potential as a function of the nucleosome-nucleosome distance. This enabled us to interpret the folding transition of chromatin in terms of a first-order phase transition. This mechanism for the condensation of chromatin is discussed in terms of its biological significance.

Tonau Nakai; Kohji Hizume; Shige. H. Yoshimura; Kunio Takeyasu; Kenichi Yoshikawa

2004-07-07T23:59:59.000Z

254

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

255

Essays on transition challenges for alternative propulsion vehicles and transportation systems  

E-Print Network (OSTI)

Technology transitions require the formation of a self-sustaining market through alignment of consumers' interests, producers' capabilities, infrastructure development, and regulations. In this research I develop a broad ...

Struben, Jeroen J. R

2006-01-01T23:59:59.000Z

256

Experiments with in-transit processing for data intensive grid workflows  

Science Conference Proceedings (OSTI)

Efficient and robust data streaming and in-transit data manipulations are critical requirements of emerging scientific and engineering application workflows, which are based on seamless interactions and coupling between geographically distributed application ...

Virai Bhat; Manish Parashar; Scott Klasky

2007-09-01T23:59:59.000Z

257

Alternative Fuels Data Center: Mass Transit  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Mass Transit to Mass Transit to someone by E-mail Share Alternative Fuels Data Center: Mass Transit on Facebook Tweet about Alternative Fuels Data Center: Mass Transit on Twitter Bookmark Alternative Fuels Data Center: Mass Transit on Google Bookmark Alternative Fuels Data Center: Mass Transit on Delicious Rank Alternative Fuels Data Center: Mass Transit on Digg Find More places to share Alternative Fuels Data Center: Mass Transit on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Ridesharing Mass Transit Active Transit Multi-Modal Transportation Telework Mass Transit Passenger-Miles per Gallon Passenger-miles per gallon (pmpg) is a metric for comparing mass transit and rideshare with typical passenger vehicle travel. Transportation system

258

Alternative Fuels Data Center: Active Transit  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Active Transit to Active Transit to someone by E-mail Share Alternative Fuels Data Center: Active Transit on Facebook Tweet about Alternative Fuels Data Center: Active Transit on Twitter Bookmark Alternative Fuels Data Center: Active Transit on Google Bookmark Alternative Fuels Data Center: Active Transit on Delicious Rank Alternative Fuels Data Center: Active Transit on Digg Find More places to share Alternative Fuels Data Center: Active Transit on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Ridesharing Mass Transit Active Transit Multi-Modal Transportation Telework Active Transit Photo of people riding bikes. Active transit is human-powered transportation such as biking and walking. Active transportation eliminates vehicle miles traveled altogether, so this

259

RDMD Transition Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EMERGING TECHNOLOGIES FOR LARGE SCALE ENERGY EMERGING TECHNOLOGIES FOR LARGE SCALE ENERGY STORAGE - TOWARDS LOW TEMPERATURE SODIUM BATTERIES JUN LIU PACIFIC NORTHWEST NATIONAL LABORATORY, RICHLAND, WA 99252 PNNL: Zhenguo Yang, Yuliang Cao, Xiaolin Li, Lifeng Xiao Sandia: Bruce C. Bunker Supported by PNNL's transformational Materials Science Initiative Funded by the Energy Storage Systems Program of the U.S. Department Of Energy through Pacific Northwest National Laboratories Significant challenges for meeting the long term low cost and reliability requirement for stationary energy storage. Distributed storage Central storage End user storage Capital cost ($/kWh) CAES Pumped Hydro Power Stationary 1 kW 100 kW 10 MW 1 GW 10 kW 1 MW 100 MW Li Ion Battery NaS, Na metal halide Vehicle Energy Density and Cost Lifetime and Capital Cost

260

Transitions between Baroclinic Flow Regimes  

Science Conference Proceedings (OSTI)

we use truncated spectral Eady models with two Ekman layers of different strength to investigate the baroclinic flow transitions observed in annulus experiments. Our analysis is both analytical and numerical As the dissipation parameter is varied ...

H-Y. Weng; A. Barcilon; J. Magnan

1986-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Nonisothermal Multifluid Transition to Equilibrium  

NLE Websites -- All DOE Office Websites (Extended Search)

Nonisothermal Multifluid Transition to Equilibrium Nonisothermal Multifluid Transition to Equilibrium Processes of interest to the simulation of CH 4 production from gas hydrates in porous media include multifluid flow and heat transport along with complex phase transitions, including hydrate dissociation and formation. Before executing problems with the additional complexities involved with the gas hydrate phase, a base case problem has been designed to examine the numerical simulation of multifluid flow and heat transport processes with a single phase transition from aqueous saturated to unsaturated conditions for a water-CH 4 system outside the stability region for gas hydrate formation. The problem involves a horizontal one-dimensional closed domain (no flow boundary conditions), initialized with gradients in aqueous pressure, gas

262

Project X functional requirements specification  

SciTech Connect

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Mishra, S.; Nagaitsev, S.; Tschirhart, R.; /Fermilab

2011-03-01T23:59:59.000Z

263

Process for Transition of Responsibilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Responsibilities Process for Transition of Responsibilities Process for Transition of Responsibilities (Waste Management Conference 2006) Process for Transition of Responsibilities...

264

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

265

IEC 61850 Implementation and Transition  

Science Conference Proceedings (OSTI)

This IEC 61850 Implementation and Transition survey report summarizes results of an EPRI survey designed to understand adoption and usage of IEC 61850 within utilities as of 2011. Implementing IEC 61850 within a utility is not necessarily easy or straightforward. While transitioning electromechanical relays to microprocessors is a relatively straightforward process, taking advantage of the entire suite of benefits enabled by IEC-61850-enabled devices is another matter altogether. Utilities have to consid...

2011-12-06T23:59:59.000Z

266

Building Technologies Office: Transitioning Traditional HVAC...  

NLE Websites -- All DOE Office Websites (Extended Search)

Transitioning Traditional HVAC Contractors to Whole House Performance Expert Meeting to someone by E-mail Share Building Technologies Office: Transitioning Traditional HVAC...

267

Transition Zone Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Transition Zone Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Transition Zone Geothermal Region edit Details Areas (5) Power Plants (0) Projects...

268

Power Marketing Administrations Leading the Nation's Transition...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administrations Leading the Nation's Transition to a 21st Century Electric Grid Power Marketing Administrations Leading the Nation's Transition to a 21st Century Electric...

269

Data:2d8ba163-bcc6-48fe-959f-3e119b3e1b24 | Open Energy Information  

Open Energy Info (EERE)

ba163-bcc6-48fe-959f-3e119b3e1b24 ba163-bcc6-48fe-959f-3e119b3e1b24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E1 - 158 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

270

Development of Site Transition Plan, Use of the Site Transition Framework,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Site Transition Plan, Use of the Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition This memorandum provides additional guidance on preparation of the Site Transition Plan (STP). Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition More Documents & Publications Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Process for Transition of Responsibilities Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy

271

Terms and Conditions for Site Transition | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Terms and Conditions for Site Transition Terms and Conditions for Site Transition Terms and Conditions for Site Transition Terms and Conditions for Site Transition More Documents &...

272

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by students who start during or after the Spring 2012 semester is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

273

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

274

Humidity requirements in WSCF Laboratories  

SciTech Connect

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

275

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

276

Home: Directives, Delegations, and Requirements  

NLE Websites -- All DOE Office Websites

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

277

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

278

Modelling societal transitions with agent transformation  

Science Conference Proceedings (OSTI)

Transition models explain long-term and large-scale processes fundamentally changing the structure of a societal system. Our concern is that most transition models are too static. Although they capture a move of focus from static equilibria to transitions ... Keywords: Agent-based modelling, Integrated sustainability assessment, Societal transitions

Michel Schilperoord; Jan Rotmans; Noam Bergman

2008-12-01T23:59:59.000Z

279

Advancing lighting and daylighting simulation: The transition from analysis to design aid tools  

SciTech Connect

This paper explores three significant software development requirements for making the transition from stand-alone lighting simulation/analysis tools to simulation-based design aid tools. These requirements include specialized lighting simulation engines, facilitated methods for creating detailed simulatable building descriptions, an automated techniques for providing lighting design guidance. Initial computer implementations meant to address each of these requirements are discussed to further elaborate these requirements and to illustrate work-in-progress.

Hitchcock, R.J.

1995-05-01T23:59:59.000Z

280

The Practice of Parking Requirements  

E-Print Network (OSTI)

the cost of the required parking is thus $20 per square foot$40 per square foot of floor area, or twice the cost in aper 1,000 square feet in a TOD, and the developer's cost of

Shoup, Donald C.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

282

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

283

Physics and detector simulation requirements  

Science Conference Proceedings (OSTI)

‘‘This document describes the computing environment needed to meet the requirements for high energy physics Monte Carlo Calculations for the simulation of Superconducting Super Collider Laboratory physics and detectors.’’ (AIP)

Computer Acquisition Working Group

1990-01-01T23:59:59.000Z

284

SofTV Viewer Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

may be required to view all features in a presentations where build steps and animations are published. (This feature can be turned off) Netscape 7.1+ Presentations created...

285

OpenEI - land requirements  

Open Energy Info (EERE)

en.openei.orgdatasetstaxonomyterm4180 en Land use requirements for ground-mounted solar power facilities. http:en.openei.orgdatasetsnode454

This dataset is part of...

286

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

287

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

288

Functional Requirements for Customer Communications  

Science Conference Proceedings (OSTI)

Customer communications infrastructures could support a wide variety of useful utility operations and industry-wide applications. However, these systems will require a substantial investment, which necessitates viewing customer communications with multiple stakeholders and applications in mind. This report describes the development of requirements for customer interface applications such as revenue metering, communications gateways, and remote equipment operations that can provide the basis for powerful ...

2002-12-18T23:59:59.000Z

289

Lab transitions employee giving campaigns  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab transitions employee giving campaigns Lab transitions employee giving campaigns Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Lab transitions employee giving campaigns This year's theme: "I Give Because..." November 1, 2013 Employee Giving Logo The theme for this year's employee giving campaigns Contact Community Programs Office Director Kurt Steinhaus Email Editor Linda Anderman Email During the past seven years contributions to the Lab's annual employee giving campaign have risen by 370 percent and hopes to surpass the $3.1 million amount collected last year. As in past years, that amount includes a $1 million dollar match from the Lab's manager, Los Alamos National Security, LLC (LANS). The funds support nonprofits within the region and

290

Strategies to address transition costs in the electricity industry  

SciTech Connect

Transition costs are the potential monetary losses that electric- utility shareholders, ratepayers, or other parties might experience because of structural changes in the electricity industry. Regulators, policy analysts, utilities, and consumer groups have proposed a number of strategies to address transition costs, such as immediately opening retail electricity markets or delaying retail competition. This report has 3 objectives: identify a wide range of strategies available to regulators and utilities; systematically examine effects of strategies; and identify potentially promising strategies that may provide benefits to more than one set of stakeholders. The many individual strategies are grouped into 6 major categories: market actions, depreciation options, rate-making actions, utility cost reductions, tax measures, and other options. Of the 34 individual strategies, retail ratepayers have primary or secondary responsibility for paying transition costs in 19 of the strategies, shareholders in 12, wheeling customers in 11, taxpayers in 8, and nonutility suppliers in 4. Most of the strategies shift costs among different segments of the economy, although utility cost reductions can be used to offset transition costs. Most of the strategies require cooperation of other parties, including regulators, to be implemented successfully; financial stakeholders must be engages in negotiations that hold the promise of shared benefits. Only by rejecting ``winner-take-all`` strategies will the transition-cost issue be expeditiously resolved.

Baxter, L.; Hadley, S.; Hirst, E.

1996-07-01T23:59:59.000Z

291

The Multi Optical Transition Radiation System  

SciTech Connect

The determination and monitoring of the transverse phase space in ATF2 is crucial in order to meet their performances specifications. Since the beam sizes at the Interaction Point (IP) depend strongly on the aberrations in the Final Focus System (FFS), accurate measurement upstream of the FFS is required to tune the beam sizes at the IP. The beam sizes as well as the emittance are measured in several locations in the beam diagnostic section of the Extraction Line (EXT line) of ATF2. The vertical beam sizes in the diagnostic section are of the order of 10 {mu}m this means that the devices have to image spot sizes as small as 5 {mu}m, with 10% accuracy a 2 {mu}m resolution device is necessary. The ATF2 EXT line is a beam line with low power and low repetition rate that make usable devices using solid targets. In contrast to a ring machine, where an individual bunch can be measured many times as it passes around the ring, the beam size and the emittance measurement in the LC or in the beam lines have to be performed in a single pass. This requires that the wire scan device types (laser or solid) sample across successive bunches within a train, often with an over-estimation of the beam size due to beam position and intensity jitter, and can take up to half a minute to complete the measurement. Although some of these effects could be corrected, as the jitter effect could be subtracted by using the nearby BPMs signals, this can be avoided by using Optical Transition Radiation (OTR) Monitors. These monitors are based on the transition radiation effect, a light cone emitted when the charged particle crosses a metallic interface. This light is emitted in a specular fashion so it can be focused on to a CCD and produces an image of the beam. OTRs are able to take many fast measurements and therefore to measure the emittance with high statistics, giving a low error and a good understanding of the emittance jitter. In this article, simulations of the expected beam sizes and emittance, along with a technical description of the system, its hardware and software implementation are described. Additionally first measurement of the beam size and emittance of the Multi Optical Transition Radiation System located in the Extraction Line of ATF2 are presented.

Faus-Golfe, A.; Alabau-Gonzalvo, J.; Blanch Gutierrez, C.; /Valencia U., IFIC; McCormick, D.; Cruz, J.; Woodley, M.; White, G.; /SLAC

2012-04-19T23:59:59.000Z

292

Ashok Leyland: IT in Transition  

Science Conference Proceedings (OSTI)

An organization that has been traditionally known to have a strong in house information technology development team and has successfully managed a home grown ERP solution for over a decade faces a transition point. Ashok Leyland, a large leading Indian ... Keywords: Automobile, Enterprise Resource Planning ERP, Homegrown Solutions, Implementation, India

Priya Seetharaman; Ambreen Alam Sajjad

2012-07-01T23:59:59.000Z

293

Transition metal sulfide loaded catalyst  

DOE Patents (OSTI)

A zeolite-based catalyst is described for activation and conversion of methane. A zeolite support includes a transition metal (Mo, Cr or W) sulfide disposed within the micropores of the zeolite. The catalyst allows activation and conversion of methane to C[sub 2]+ hydrocarbons in a reducing atmosphere, thereby avoiding formation of oxides of carbon.

Maroni, V.A.; Iton, L.E.; Pasterczyk, J.W.; Winterer, M.; Krause, T.R.

1994-04-26T23:59:59.000Z

294

Transition metal sulfide loaded catalyst  

DOE Patents (OSTI)

A zeolite based catalyst for activation and conversion of methane. A zeolite support includes a transition metal (Mo, Cr or W) sulfide disposed within the micropores of the zeolite. The catalyst allows activation and conversion of methane to C.sub.2 + hydrocarbons in a reducing atmosphere, thereby avoiding formation of oxides of carbon.

Maroni, Victor A. (Naperville, IL); Iton, Lennox E. (Downers Grove, IL); Pasterczyk, James W. (Westmont, IL); Winterer, Markus (Westmont, IL); Krause, Theodore R. (Lisle, IL)

1994-01-01T23:59:59.000Z

295

FCCU transition-probability model  

Science Conference Proceedings (OSTI)

The adequacy of the use of transition-probability matrices for modelling fluidised catalyst cracker unit emissions was investigated. A number of different-sized matrices that modelled the processes of attrition and agglomeration were used, and it was ... Keywords: Agglomeration, Attrition, Probability matrix

Robbie J. Dixon; Maki Matsuka; Roger D. Braddock; Josh M. Whitcombe; Igor E. Agranovski

2007-02-01T23:59:59.000Z

296

Examples of in transit visualization  

Science Conference Proceedings (OSTI)

One of the most pressing issues with petascale analysis is the transport of simulation results data to a meaningful analysis. Traditional workflow prescribes storing the simulation results to disk and later retrieving them for analysis and visualization. ... Keywords: in situ, in transit, parallel scientific visualization, staging

Kenneth Moreland; Ron Oldfield; Pat Marion; Sebastien Jourdain; Norbert Podhorszki; Venkatram Vishwanath; Nathan Fabian; Ciprian Docan; Manish Parashar; Mark Hereld; Michael E. Papka; Scott Klasky

2011-11-01T23:59:59.000Z

297

OMB Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB Requirements OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information

298

Surveillance & Maintenance: The Requirements Based Surveillance and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

299

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

300

New Solutions Require New Thinking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions Require Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication systems * Demand response programs Reducing Peak Demand The RDSI program aims to reduce peak load on distribution feeders 20% by 2015. To help achieve this goal, RDSI is sponsoring demonstration projects nationwide. From California to New York, these projects are

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

302

Stellar Astrophysics Requirements NERSC Forecast  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements for Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis (Munich), Andrzej Odrzywolek (Cracow), Ju Zhang (FIT), Andrey Zhiglo (Kharkov) 1. m461: Stellar Explosions in Three Dimensions * Summarize your projects and expected scientific objectives through 2014 * Modeling and simulations of transient phenomena in stellar astrophysics driven by either radiation or thermonuclear processes * Numerical solution of a coupled system of PDEs and ODEs * Tame nonlinearity! * Our goal is to ... * Explain observed properties of exploding stellar objects * Present focus is ... * Neutrino-driven core-collapse supernova explosions * In the next 3 years we expect to ...

303

DOE Transition Documents - 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transition Documents - 2008 Transition Documents - 2008 DOE Transition Documents - 2008 Following are the DOE Transition Documents - 2008 Files in PDF format 2008_Transition_Corporate_Overview_Book_One.pdf 2008_Transition_Important_Issues_Book_Two.pdf 2008_Transition_Program_Details_Book_Three.pdf 2008_Transition_Budget_Details_Book_Four.pdf Authorize_Changes_Contractor_Work_Force_Restructuring_Policy.pdf Compilation Congressional Correspondence, January 1, 2008 throught November 14, 2008 COMPILATION OF MEMORANDA OF UNDERSTANDING AND INTERAGENCY AGREEMENTS DOE Transition Team President-Elect's 2008 Compliance_Policies_Guidance_Contractor__Force_Restructuring.pdf DOE_Contractor_Work_Force_Restructuring_Approval_Thresholds.pdf DOE_Selects_Savannah_River_Remediation__Liquid_Waste.pdf DOE STGWG Group

304

High temperature superconductivity in metallic region near Mott transition  

E-Print Network (OSTI)

The spin-singlet superconductivity without phonons is examined in consideration of correlations on an extended Hubbard model. It is shown that the superconductivity requires not only the total correlation should be strong enough but also the density of state around Fermi energy should be large enough, which shows that the high temperature superconductivity could only be found in the metallic region near the Mott metal insulator transition (MIT). Other properties of superconductors are also discussed on these conclusions.

Tian De Cao

2009-06-11T23:59:59.000Z

305

Data:5f9187d2-e0e6-4e1d-bd48-26e88932c3e0 | Open Energy Information  

Open Energy Info (EERE)

87d2-e0e6-4e1d-bd48-26e88932c3e0 87d2-e0e6-4e1d-bd48-26e88932c3e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - MMRA-16 (Transmission < 230kV voltage) Sector: Residentia l Description: Applicable to electric service for the total electrical requirements of master-metered residential apartment complexes where the complex owns, operates, and maintains its own distribution system and distributes electric service to individual family apartments for domestic purposes, and other uses such as central air conditioning and heating, laundry, lighting, and water heating, where all such services are provided only for the apartment complex. Such other uses may be separated from service used within the individual apartment and served on a general service rate schedule. Service hereunder is for the exclusive use of the apartment complex, for itself and its residential tenants and is not to be used for standby, resold, except as may be furnished to its tenants, if no specific charge is made therefor, and is not available to other parties within or without the apartment complex for commercial establishments. Service hereunder shall be supplied at one point of delivery and measured through one meter. Service hereunder is subject to any of Company's rider schedules that may be applicable.

306

Data:Ccf55a8f-25b3-47cf-b713-595a3e1b3b58 | Open Energy Information  

Open Energy Info (EERE)

Ccf55a8f-25b3-47cf-b713-595a3e1b3b58 Ccf55a8f-25b3-47cf-b713-595a3e1b3b58 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate - EH OPTIONAL RATE FOR ELECTRIC SPACE HEATING - Single Phase Service Sector: Commercial Description: Applicable to electric service for heating when customer's wiring is so arranged that heating service can be furnished at one point of delivery and can be metered separately from all other types of service or to any public school, parochial school, private school, or church when supplied at one point of delivery, provided permanently connected and regularly used electrical equipment is installed in compliance with the Company specifications as the primary source of heating or heating and cooling the atmosphere to temperatures of human comfort; and provided all other electrical energy requirements are purchased from the Company. For the purpose of the administration of this tariff schedule, primary source is defined as at least 90 percent (90%). No single water-heating unit shall be wired that the demand established by it can exceed 5.5 kilowatts unless approved by the Company.

307

Transit Timing Variation Analysis of Ogle-Tr-132b with Seven New Transits  

E-Print Network (OSTI)

We report the results of the first transit timing variation analysis of the very hot Jupiter OGLE-TR-132b, using 10 transits collected over a seven-year period. Our analysis combines three previously published transit light ...

Adams, Elisabeth Rose

308

ALLOCATION OF REACTIVE SUPPORT REQUIREMENTS  

E-Print Network (OSTI)

the voltage setting point s kV of each bus Qk and the voltage profile for the buses c j Q . Recall that Q for these transactions so that all bus voltages meet the specified voltage profile requirements. Consequently load is locally met at the bus. In other words, we assume that at each load bus the power factor is 1

Gross, George

309

Enhanced oil recovery water requirements  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are evaluated using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in 14 major oil companies. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and CO/sub 2/, micellar-polymer, polymer, and caustic flooding) in those states and specific geographic locations where these processes will play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources. A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can reduce significantly the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality surface water and ground water could be impediments to certain projects in the near future.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1983-03-01T23:59:59.000Z

310

Require selection of units? | OpenEI Community  

Open Energy Info (EERE)

Require selection of units? Require selection of units? Home > Groups > Utility Rate I found a rate with no unit selected for "energyrateunit". Can we make this a required field (if data exists for that tab)? http://en.openei.org/wiki/Data:01611e1f-b9cd-4c9a-92fe-293021bfa87f Submitted by Ewilson on 20 June, 2013 - 12:31 3 answers Points: 1 Good point. I don't think that will be hard. I will pass it along to our programmers. We should be able to implement this in the next two to three weeks. Dloomis on 22 June, 2013 - 06:04 Points: 0 Thanks for answering the question! I think this makes a lot of sense. Sfomail on 24 June, 2013 - 08:26 Points: 0 Great, that is good to hear. Thanks! Ewilson on 24 June, 2013 - 07:17 Groups Menu You must login in order to post into this group.

311

Require selection of units? | OpenEI Community  

Open Energy Info (EERE)

Require selection of units? Require selection of units? Home > Groups > Utility Rate I found a rate with no unit selected for "energyrateunit". Can we make this a required field (if data exists for that tab)? http://en.openei.org/wiki/Data:01611e1f-b9cd-4c9a-92fe-293021bfa87f Submitted by Ewilson on 20 June, 2013 - 12:31 3 answers Points: 1 Good point. I don't think that will be hard. I will pass it along to our programmers. We should be able to implement this in the next two to three weeks. Dloomis on 22 June, 2013 - 06:04 Points: 0 Thanks for answering the question! I think this makes a lot of sense. Sfomail on 24 June, 2013 - 08:26 Points: 0 Great, that is good to hear. Thanks! Ewilson on 24 June, 2013 - 07:17 Groups Menu You must login in order to post into this group.

312

Data:F936b9f4-0442-4860-b4e6-4af17ad2e1b6 | Open Energy Information  

Open Energy Info (EERE)

6b9f4-0442-4860-b4e6-4af17ad2e1b6 6b9f4-0442-4860-b4e6-4af17ad2e1b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Singing River Elec Pwr Assn (Mississippi) Effective date: 2009/12/04 End date if known: Rate name: Security Lighting MV 175 W Sector: Lighting Description: *Subject to power cost adjustment, tax expense adjustment, and an environmental compliance charge. Source or reference: http://www.singingriver.com/Files/R-18.pdf Source Parent: Comments Energy Adjustment is Power Cost Adjustment plus Environmental Clause plus Regulatory Adjustment Applicability Demand (kW) Minimum (kW): Maximum (kW):

313

Data:21449cf0-67c2-4e1f-9c65-3bcdf3ef7617 | Open Energy Information  

Open Energy Info (EERE)

67c2-4e1f-9c65-3bcdf3ef7617 67c2-4e1f-9c65-3bcdf3ef7617 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2011/07/08 End date if known: Rate name: OUTDOOR LIGHTING "OL" High Pressure Sodium 400W Sector: Lighting Description: there are many different classifications for different structures for lights. The monthly charge here is for the existing pole. Click on the link for other structures. Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

314

Data:Dc152314-1a17-46e1-8abc-339f3a3e1522 | Open Energy Information  

Open Energy Info (EERE)

52314-1a17-46e1-8abc-339f3a3e1522 52314-1a17-46e1-8abc-339f3a3e1522 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Monroe County Elec Coop, Inc Effective date: 2013/04/01 End date if known: Rate name: Security Lights(35 W Entrance Lights) Sector: Commercial Description: Unmetered automatic Mercury Vapor Lighting and High Pressure Lighting, shall be available to consumers of the cooperative at the following rates and conditions. Source or reference: http://www.mcec.org/Documents/2013%20Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

315

Data:9a6b1c4c-e734-4985-b082-6df7e1ad233d | Open Energy Information  

Open Energy Info (EERE)

b1c4c-e734-4985-b082-6df7e1ad233d b1c4c-e734-4985-b082-6df7e1ad233d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Moon Lake Electric Assn Inc Effective date: 2000/01/01 End date if known: Rate name: YARD AND PROTECTIVE LIGHTING Sector: Lighting Description: Conditions for Service: Facilities involved are owned by the Association. The Association will provide at its expense all necessary labor and materials for repair and maintenance, except in the case of vandalism. The Association will perform necessary repair or maintenance at its earliest convenience and during normal working hours.

316

Data:3e5e9e4c-5e1a-440e-9afe-8ddd05e85b3b | Open Energy Information  

Open Energy Info (EERE)

c-5e1a-440e-9afe-8ddd05e85b3b c-5e1a-440e-9afe-8ddd05e85b3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Williams - AZ, Arizona (Utility Company) Effective date: End date if known: Rate name: Dusk to Dawn Lighting Service(LPS 55 W-Pole) Sector: Lighting Description: Where customer installs and maintains lighting facilities and City approves installation, operates and replaces lamps. Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

317

Data:D24d07e1-52e8-4158-b9f1-ab1530564697 | Open Energy Information  

Open Energy Info (EERE)

d07e1-52e8-4158-b9f1-ab1530564697 d07e1-52e8-4158-b9f1-ab1530564697 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2012/09/01 End date if known: Rate name: Rate LTOU Distribution Primary Rate Sector: Industrial Description: Available to customers who's demand exceeds 100 kW. A discount of 1% is added to the demand and energy charges for customers qualifying as distribution primary service, which is defined as service taken at standard distribution voltages where the customer owns the final distribution transformation equipment. Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates

318

Data:D5cc0018-04f7-4e98-99e1-df95927ed633 | Open Energy Information  

Open Energy Info (EERE)

18-04f7-4e98-99e1-df95927ed633 18-04f7-4e98-99e1-df95927ed633 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wilton, Iowa (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Primary Power Rate Sector: Commercial Description: The primary power rate for electric energy sold by the system and accepted by the customer at primary voltage and metered at the point of delivery, with the transformers owned by and located on the customers property shall be at the Small General Service Rate less a 1% discount. Source or reference: Rate Binder Ted 2 ISU Documentation

319

Data:91db2750-fc0a-4bce-a6ed-82bb79da62e1 | Open Energy Information  

Open Energy Info (EERE)

db2750-fc0a-4bce-a6ed-82bb79da62e1 db2750-fc0a-4bce-a6ed-82bb79da62e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E11 - 68 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

320

Data:7e0d8df3-e7e1-47c0-bc77-049a6efd324f | Open Energy Information  

Open Energy Info (EERE)

df3-e7e1-47c0-bc77-049a6efd324f df3-e7e1-47c0-bc77-049a6efd324f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Periodic Incandescent Lighting-105 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:6c9c9670-0370-4699-b0e1-80c1074a676f | Open Energy Information  

Open Energy Info (EERE)

-0370-4699-b0e1-80c1074a676f -0370-4699-b0e1-80c1074a676f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: 2012/10/01 End date if known: Rate name: City of Austin - Owned Outdoor Lighting - 250 W hps Sector: Description: Power Supply Adjustment fee - plus an adjustment for variable costs, calculated under the Power Supply Adjustment rate schedule , multiplied by the billable kWh. Source or reference: www.austinenergy.com/About Us/Rates/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

322

Data:7b0e1af4-d59b-4700-9d74-39fc803f9b4d | Open Energy Information  

Open Energy Info (EERE)

e1af4-d59b-4700-9d74-39fc803f9b4d e1af4-d59b-4700-9d74-39fc803f9b4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Municipal Incandescent-295 watts Sector: Lighting Description: Energy service only to municipalities owning, operating, and maintaining a street lighting system and limited to locations where secondary service is available. Traffic control lighting service may be rendered under this rate providing the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

323

Data:413a465e-1b15-4845-83d2-3753c1a29c01 | Open Energy Information  

Open Energy Info (EERE)

a465e-1b15-4845-83d2-3753c1a29c01 a465e-1b15-4845-83d2-3753c1a29c01 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (Incandescent Luminaire 4000 L) Sector: Commercial Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf

324

Data:Ce3237bb-cae0-41e1-9071-8c3b47d12127 | Open Energy Information  

Open Energy Info (EERE)

bb-cae0-41e1-9071-8c3b47d12127 bb-cae0-41e1-9071-8c3b47d12127 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 150 edison 111 type 111 Sector: Commercial Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

325

Data:91d9fa08-7240-46aa-8765-89e1c5ff085c | Open Energy Information  

Open Energy Info (EERE)

fa08-7240-46aa-8765-89e1c5ff085c fa08-7240-46aa-8765-89e1c5ff085c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: Seasonal Service Sector: Commercial Description: *** The charge will increase to $30.00 on August 1 2012 AVAILABILITY This rate schedule is available for electric service supplied through one meter for seasonal and recreational use services located in the lake areas of Hidden Valley, Sugar Valley, Tanglewood and Chapparral. CHARACTER OF SERVICE Alternating current, 60 cycle, single phase, 120 or 1201240 volt.

326

Data:11d9c91c-4c68-4831-bd6a-e1ac22d29847 | Open Energy Information  

Open Energy Info (EERE)

4c68-4831-bd6a-e1ac22d29847 4c68-4831-bd6a-e1ac22d29847 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Baudette, Minnesota (Utility Company) Effective date: 2011/04/20 End date if known: Rate name: Rate 5 Off Peak Residential Sector: Residential Description: Off-peak rates are for winter months only: Sept 21 - June 20. The other time will be calculated using Rate 1 Residential rates. The monthly fixed charge is a weighted average between the two rates. Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

327

Data:2bb8b4bf-9e7d-4e1e-8505-efb20b87e4e9 | Open Energy Information  

Open Energy Info (EERE)

bf-9e7d-4e1e-8505-efb20b87e4e9 bf-9e7d-4e1e-8505-efb20b87e4e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wakefield, Michigan (Utility Company) Effective date: 2007/03/01 End date if known: Rate name: Commercial and Pumping Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

328

Data:Df6e3961-2f56-480b-98e1-ac714759e207 | Open Energy Information  

Open Energy Info (EERE)

2f56-480b-98e1-ac714759e207 2f56-480b-98e1-ac714759e207 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Thomaston, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential Power Sector: Residential Description: For all domectic uses of a residential customer in a separetely metered residence. Source or reference: Rate Binder# 2 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

329

Data:Ad5c3549-954a-4287-b67c-e1c907f8adc3 | Open Energy Information  

Open Energy Info (EERE)

49-954a-4287-b67c-e1c907f8adc3 49-954a-4287-b67c-e1c907f8adc3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Municipal Lighting Electric Rates Sector: Lighting Description: Most of the city's lights are on metered circuits and are billed according to the registered monthly energy usage. Subject to Power Cost Adjustment. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

330

Data:2ede340d-335b-46e1-aa18-9aea3fd886c9 | Open Energy Information  

Open Energy Info (EERE)

ede340d-335b-46e1-aa18-9aea3fd886c9 ede340d-335b-46e1-aa18-9aea3fd886c9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Local Government Rate-Flashers and Signal Lights (8-way Signal w/o Crosswalk) Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

331

Data:Df8e1df8-1796-4d76-b03a-f654e0fcfae9 | Open Energy Information  

Open Energy Info (EERE)

e1df8-1796-4d76-b03a-f654e0fcfae9 e1df8-1796-4d76-b03a-f654e0fcfae9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 10000 lumens NEMA Head Sector: Lighting Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

332

Data:E00b7179-4ca5-4658-ad2c-768e1cb80690 | Open Energy Information  

Open Energy Info (EERE)

b7179-4ca5-4658-ad2c-768e1cb80690 b7179-4ca5-4658-ad2c-768e1cb80690 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - Metered Lights (Rental) Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

333

Data:49973520-f297-406a-94cd-26b8fab0b5e1 | Open Energy Information  

Open Energy Info (EERE)

0-f297-406a-94cd-26b8fab0b5e1 0-f297-406a-94cd-26b8fab0b5e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- Unmetered- 100W High Pressure Sodium Sector: Lighting Description: Applicable to street and highway lighting where customer owns and maintains street lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LS2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

334

Data:98ac88f1-89e1-4ae1-bba4-4ba11c96cded | Open Energy Information  

Open Energy Info (EERE)

ac88f1-89e1-4ae1-bba4-4ba11c96cded ac88f1-89e1-4ae1-bba4-4ba11c96cded No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Mercury Vapor, 17000 Lumen, 400 watts, Class B Sector: Lighting Description: Class B: Mercury Vapor Lamps or Sodium Vapor Lamps on standard overhead wood pole construction, owned and operated by utility. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

335

Data:A7a468b3-ee07-48c0-a615-e1d5b9f45615 | Open Energy Information  

Open Energy Info (EERE)

b3-ee07-48c0-a615-e1d5b9f45615 b3-ee07-48c0-a615-e1d5b9f45615 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sylvania, Georgia (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Industrial Electric Under 500 Sector: Industrial Description: Source or reference: Rate Binder #2 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

336

Data:25f51d6b-9393-44ed-95e1-b67cf2ecef7c | Open Energy Information  

Open Energy Info (EERE)

b-9393-44ed-95e1-b67cf2ecef7c b-9393-44ed-95e1-b67cf2ecef7c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Amicalola Electric Member Corp Effective date: End date if known: Rate name: Security Lights Patriarch 100 W Sector: Lighting Description: Source or reference: http://www.amicalolaemc.com/securitylights.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

337

Data:B9f656e1-d503-4991-b270-504c93faeda1 | Open Energy Information  

Open Energy Info (EERE)

6e1-d503-4991-b270-504c93faeda1 6e1-d503-4991-b270-504c93faeda1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2012/01/01 End date if known: Rate name: CONSUMER OWNED STREET LIGHTING Metal Halide 150 Sector: Lighting Description: CONSUMER OWNED SYSTEM OPERATED BY DISTRICT Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

338

Data:D4b211c5-938e-45ab-a5b8-edc53ed137e1 | Open Energy Information  

Open Energy Info (EERE)

c5-938e-45ab-a5b8-edc53ed137e1 c5-938e-45ab-a5b8-edc53ed137e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bon Homme Yankton El Assn, Inc Effective date: 2012/05/01 End date if known: Rate name: Irrigation, Three-Phase Controlled Sector: Industrial Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

339

Data:9e36c369-f7b9-499f-b282-635b7cc716e1 | Open Energy Information  

Open Energy Info (EERE)

9-f7b9-499f-b282-635b7cc716e1 9-f7b9-499f-b282-635b7cc716e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Cooperative Furnished Investment 150 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

340

Data:0d999486-b06b-4af0-8fa9-5e7829e1fbef | Open Energy Information  

Open Energy Info (EERE)

9486-b06b-4af0-8fa9-5e7829e1fbef 9486-b06b-4af0-8fa9-5e7829e1fbef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Public Authority Small Commercial Three Phase- Outside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:0ed73162-f474-453f-b040-429d56e1e057 | Open Energy Information  

Open Energy Info (EERE)

ed73162-f474-453f-b040-429d56e1e057 ed73162-f474-453f-b040-429d56e1e057 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: General Service Three Phase Sector: Residential Description: The schedule is available for electric service to each individual residence, school, church, or community hall, in all territory served by the Cooperative, that takes service at one delivery point through one kilowatt-hour meter. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

342

Data:A2e5528e-1a4d-48d6-825c-f35425e822df | Open Energy Information  

Open Energy Info (EERE)

528e-1a4d-48d6-825c-f35425e822df 528e-1a4d-48d6-825c-f35425e822df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Idaho Power Co (Oregon) Effective date: 2010/10/18 End date if known: Rate name: 1 (Residential Service) Sector: Residential Description: Service under this schedule is available at points on the Company's interconnected system within the State of Oregon where existing facilities of adequate capacity and desired phase and voltage are adjacent to the Premises to be served, and additional investment by the Company for new transmission, substation or terminal facilities is not necessary to supply the desired service.

343

Data:9cc81710-8df8-4e1d-ab33-e62272141c99 | Open Energy Information  

Open Energy Info (EERE)

10-8df8-4e1d-ab33-e62272141c99 10-8df8-4e1d-ab33-e62272141c99 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wabash County Rural E M C Effective date: 2012/01/01 End date if known: Rate name: Outdoor Security Lighting, Mercury, 400W Sector: Lighting Description: Availability Available when the security light can be mounted on a Wabash County REMC-owned pole. Security lighting service will only be rendered where in the opinion of Wabash County REMC; such lights are readily accessible for maintenance. Source or reference: http://www.wabashremc.com/wp-content/uploads/2012/01/Security-Light-Rate.pdf

344

Data:E43c36b8-16e1-4369-aaee-7578d3e90ea5 | Open Energy Information  

Open Energy Info (EERE)

6b8-16e1-4369-aaee-7578d3e90ea5 6b8-16e1-4369-aaee-7578d3e90ea5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: Pole Attachment Sector: Commercial Description: To other utilities and certain entities which may occupy public right-of-way and who attach communication cables and other communication appliances on System poles where such attachments are made in accordance with National Electrical Safety Code (NESC) and local laws and are in compliance with the provisions of an applicable Pole Attachment Contract, if any.

345

Data:8519e4e1-e069-457e-b601-ddd648b3879e | Open Energy Information  

Open Energy Info (EERE)

9e4e1-e069-457e-b601-ddd648b3879e 9e4e1-e069-457e-b601-ddd648b3879e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search {{Utility Rate |OpenEI/UtilityRate/Utility=Commonwealth Edison Co |OpenEI/UtilityRate/StartDate=2012/06/20 |OpenEI/UtilityRate/Name=BES - Residential Non-Electric Space Heating - Single Family |OpenEI/UtilityRate/Sector=Residential |OpenEI/UtilityRate/Description=* Rider PE (summer & non-summer): https://www.comed.com/Documents/customer-service/rates-pricing/rates-information/current/PurchasedElectricityCharges.pdf Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Commonwealth Edison Co Effective date: 2012/06/20 End date if known:

346

Data:B1cd71e1-6fca-493a-9e7d-63708d69e336 | Open Energy Information  

Open Energy Info (EERE)

cd71e1-6fca-493a-9e7d-63708d69e336 cd71e1-6fca-493a-9e7d-63708d69e336 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Reading, Massachusetts (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Residential Time-of-Use Controlled Water Heater Sector: Residential Description: Additional Info: Applicable to: Individual residential customers for all domestic uses where service is taken through one On-Peak and Off-Peak meter. Incidental commercial use, not exceeding 20% of the total energy used on the same premises is permitted. The following charges/adjustments apply:

347

Data:B17f6c1e-401e-4068-963f-a1e1ab6e34bc | Open Energy Information  

Open Energy Info (EERE)

e-401e-4068-963f-a1e1ab6e34bc e-401e-4068-963f-a1e1ab6e34bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clarke-Washington E M C Effective date: End date if known: Rate name: Security Light: 100 watt without pole Sector: Lighting Description: Source or reference: http://www.cwemc.com/memberServices/productsAndServices.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

348

Data:334ff262-e1a6-45be-bab3-e0fe1242ca51 | Open Energy Information  

Open Energy Info (EERE)

e1a6-45be-bab3-e0fe1242ca51 e1a6-45be-bab3-e0fe1242ca51 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Residential All Electric Single Phase Sector: Commercial Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

349

Data:66b2a06f-b47b-4e1a-9efb-fdeb16db078c | Open Energy Information  

Open Energy Info (EERE)

b47b-4e1a-9efb-fdeb16db078c b47b-4e1a-9efb-fdeb16db078c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: NON INSTITIONAL SERVICE RATE 180000 NON ELECTRIC Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

350

Data:45374021-97cd-4c7e-ba6e-1d71437f4394 | Open Energy Information  

Open Energy Info (EERE)

-97cd-4c7e-ba6e-1d71437f4394 -97cd-4c7e-ba6e-1d71437f4394 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Natchez Trace Elec Power Assn Effective date: End date if known: Rate name: Outdoor Lighting MV 400 W Dedicated Pole & Transformer Sector: Lighting Description: Source or reference: http://www.ntepa.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

351

Data:9e45e77e-5240-4643-8e1e-7cbb5e08906d | Open Energy Information  

Open Energy Info (EERE)

e-5240-4643-8e1e-7cbb5e08906d e-5240-4643-8e1e-7cbb5e08906d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2012/04/01 End date if known: Rate name: SCHOOL SERVICE Sector: Commercial Description: APPLICABLE: All Public and Private schools at any educational level. Not applicable to day care facilities. Source or reference: http://www.epud.org/Documents/Cust%20Svc%20Docs/Rate%20Schedules%20effective%2020120401%20%28website%20version%29.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

352

Data:164540bf-21e1-436c-bfe5-d8cadd837bc7 | Open Energy Information  

Open Energy Info (EERE)

0bf-21e1-436c-bfe5-d8cadd837bc7 0bf-21e1-436c-bfe5-d8cadd837bc7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Firelands Electric Coop, Inc Effective date: End date if known: Rate name: d Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures Period/Month Matchup January

353

Data:1eb1ccb9-6164-4796-a4b4-e74f8eb816e1 | Open Energy Information  

Open Energy Info (EERE)

eb1ccb9-6164-4796-a4b4-e74f8eb816e1 eb1ccb9-6164-4796-a4b4-e74f8eb816e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/12/12 End date if known: Rate name: Lighting - Street and Highway- 30,000 Lumens High Pressure Sodium Vapor Sector: Lighting Description: Applicable to street and highway lighting service installed during underground conversion of electric facilities where the customer is responsible for maintaining the street lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LS1.pdf

354

Data:4c6f0b80-674c-44d5-ade6-e00e1a0519fc | Open Energy Information  

Open Energy Info (EERE)

674c-44d5-ade6-e00e1a0519fc 674c-44d5-ade6-e00e1a0519fc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Street Lighting Service STL-8 (250W HPS) Sector: Lighting Description: Applicable to municipal or local governmental street lighting service by means of mercury vapor or high pressure sodium lamps. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments Applicability

355

Data:Fb434813-28eb-44a4-ae2e-7b95e553e6e1 | Open Energy Information  

Open Energy Info (EERE)

Fb434813-28eb-44a4-ae2e-7b95e553e6e1 Fb434813-28eb-44a4-ae2e-7b95e553e6e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2010/07/09 End date if known: Rate name: 2 Lightinhg service to existing instalation only - schedule SHL - MV - 400W (15000 Lumen) Sector: Lighting Description: This rate schedule is applicable under the regular terms and conditions of Company to Street and Highway Lighting Service, Area Lighting Service, and Residential Subdivision Lighting (existing installations or extensions thereof) only. This rate is not applicable to new installations.

356

Data:Ad879430-fff1-43c2-ab8c-3af865e1ab27 | Open Energy Information  

Open Energy Info (EERE)

fff1-43c2-ab8c-3af865e1ab27 fff1-43c2-ab8c-3af865e1ab27 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Local Government Rate-Flashers and Signal Lights (4-way Signal) Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

357

Data:11ede5bc-43f0-4f33-8fbc-ad0d55df8e1b | Open Energy Information  

Open Energy Info (EERE)

ede5bc-43f0-4f33-8fbc-ad0d55df8e1b ede5bc-43f0-4f33-8fbc-ad0d55df8e1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Commercial Churches and Schools (KW20) Sector: Commercial Description: General commercial rate for commercial customers with monthly demand usage between 10 and 49 KWD or flat rate unmetered commercial accounts. Source or reference: http://publicutilities.columbus.gov/WorkArea/linkit.aspx?LinkIdentifier=id&ItemID=45273 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

358

Data:90173d7d-87e1-474b-91d0-e40ea1803045 | Open Energy Information  

Open Energy Info (EERE)

87e1-474b-91d0-e40ea1803045 87e1-474b-91d0-e40ea1803045 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Leigh, Nebraska (Utility Company) Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting SENU9500 Sector: Commercial Description: Source or reference: http://www.loup.com/docs/customersvc/LLS-Rates2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

359

Data:1a245ea5-2a28-477f-af28-94f279cd5e1a | Open Energy Information  

Open Energy Info (EERE)

ea5-2a28-477f-af28-94f279cd5e1a ea5-2a28-477f-af28-94f279cd5e1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (250W SV Directional Flood Lighting on existing 35 ft. steel Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

360

Data:Adcf8d23-9e1b-4239-b6d6-d50118e28522 | Open Energy Information  

Open Energy Info (EERE)

Adcf8d23-9e1b-4239-b6d6-d50118e28522 Adcf8d23-9e1b-4239-b6d6-d50118e28522 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 150 W HPS, Street Lighting Metered Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Streetlights supported on distribution type wood poles from Cooperative-owned overhead or underground system. Rate when light is Metered through customer's service. Source or reference: Rate binder # 4(Illinios State University)

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:22102f44-d41a-4a46-b821-1f13e1a11682 | Open Energy Information  

Open Energy Info (EERE)

f44-d41a-4a46-b821-1f13e1a11682 f44-d41a-4a46-b821-1f13e1a11682 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 35 W LPS Opt.1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

362

Data:6a28c94a-fe79-4e1c-b332-42a3236f2409 | Open Energy Information  

Open Energy Info (EERE)

fe79-4e1c-b332-42a3236f2409 fe79-4e1c-b332-42a3236f2409 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of South Sioux City, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Residential- All Electric Sector: Residential Description: Single family residential customers for all domestic purposes where all utility energy for the entire premises is supplied by the electrical service. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

363

Data:Bb5e24e1-1549-4f50-997b-e644341e8470 | Open Energy Information  

Open Energy Info (EERE)

e1-1549-4f50-997b-e644341e8470 e1-1549-4f50-997b-e644341e8470 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: Dusk-To-Dawn Lighting- Metered 250 W Luminaires (October 2013) Sector: Lighting Description: Applicable to any customer for private or public outdoor lighting service, whether unmetered and provided by the city, or metered. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

364

Data:81a070e1-f42b-42e5-a948-e8cdaeb1b2f3 | Open Energy Information  

Open Energy Info (EERE)

a070e1-f42b-42e5-a948-e8cdaeb1b2f3 a070e1-f42b-42e5-a948-e8cdaeb1b2f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maui Electric Co Ltd Effective date: 2012/05/04 End date if known: 2013/09/30 Rate name: Maui - TOU EV Residential Time-Of-Use Service with Electric Vehicle Pilot - Three Phase Sector: Residential Description: This Schedule is applicable to residential service customers who combine lighting, heating, cooking, air conditioning, and power in a single family dwelling unit, metered and billed separately, with charging of batteries of on-road electric vehicles. Source or reference: www.mauielectric.com

365

Data:Beef612f-bc50-4a16-bd8e-1cba244c3480 | Open Energy Information  

Open Energy Info (EERE)

Beef612f-bc50-4a16-bd8e-1cba244c3480 Beef612f-bc50-4a16-bd8e-1cba244c3480 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Security Lighting Service-100W High Pressure Sodium Coop-Owned & Maintained Sector: Lighting Description: Available upon application to all consumers for illumination of outdoor areas at any point on or near the Cooperative's distribution or service lines. Additional Poles (incl. up to 150' of wire) = $2.00/pole/month Transformers or Secondary Line installed for lighting use only = $2.00/transformer/month

366

Data:2ed345a5-3e1c-4854-b928-d06f024ee9ac | Open Energy Information  

Open Energy Info (EERE)

a5-3e1c-4854-b928-d06f024ee9ac a5-3e1c-4854-b928-d06f024ee9ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Space and Water Heating - One Phase Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

367

Data:14a7cdb7-0367-4670-b465-e1c85beb26a1 | Open Energy Information  

Open Energy Info (EERE)

cdb7-0367-4670-b465-e1c85beb26a1 cdb7-0367-4670-b465-e1c85beb26a1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Natchez Trace Elec Power Assn Effective date: End date if known: Rate name: Outdoor Lighting HPS 400 W Dedicated Pole Sector: Lighting Description: Source or reference: http://www.ntepa.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

368

Data:592df2b7-082a-4257-ab56-4efe7c93e1c7 | Open Energy Information  

Open Energy Info (EERE)

b7-082a-4257-ab56-4efe7c93e1c7 b7-082a-4257-ab56-4efe7c93e1c7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: North Central Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: 22- All Town Residentials including ( leased areas) Sector: Commercial Description: Leased Areas - Bazile Mills, Brunswick, Center, Orchard, Page, Royal, & Winnetoon, Source or reference: http://www.ncppd.com/rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

369

Data:D7d3063f-e70a-42c6-bb24-1ba43357e1f1 | Open Energy Information  

Open Energy Info (EERE)

63f-e70a-42c6-bb24-1ba43357e1f1 63f-e70a-42c6-bb24-1ba43357e1f1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 1000W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Flood',WoodPole(2)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

370

Data:9b3885e1-f78e-48c9-827f-4eae397aa7b9 | Open Energy Information  

Open Energy Info (EERE)

e1-f78e-48c9-827f-4eae397aa7b9 e1-f78e-48c9-827f-4eae397aa7b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Benton County Effective date: 2013/05/01 End date if known: Rate name: SMSB Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

371

Data:560f23ba-792f-4e8c-8cd6-2a022eb6c0e1 | Open Energy Information  

Open Energy Info (EERE)

792f-4e8c-8cd6-2a022eb6c0e1 792f-4e8c-8cd6-2a022eb6c0e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Ludlow, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 07 Commercial & Industrial Demand Metered Three Phase CT Metering Sector: Description: Source or reference: ISU Documentation DOE Sharepoint Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

372

Data:8c7159ea-d086-45e1-a749-89423c384151 | Open Energy Information  

Open Energy Info (EERE)

59ea-d086-45e1-a749-89423c384151 59ea-d086-45e1-a749-89423c384151 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2013/01/01 End date if known: Rate name: OUTDOOR AND AREA LIGHTING SERVICE-MV 175 W (OPT 1) Sector: Lighting Description: To all classes of retail customers for outdoor lighting purposes (Rate Codes 76) and to persons other than governmental subdivisions for the purpose of lighting streets, alleys, roads, driveways and parking lots (Rate Code 77) subject to any applicable Riders. Rate Code 76 is not available on a seasonal or temporary basis.

373

Data:0b5af23e-997d-4497-bc81-44775a20e1e0 | Open Energy Information  

Open Energy Info (EERE)

e-997d-4497-bc81-44775a20e1e0 e-997d-4497-bc81-44775a20e1e0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Virginia Elec Coop Effective date: 2011/10/01 End date if known: Rate name: Interruptible Service Rider - Rider IS-1 Sector: Description: Interruptible Credit: Each October billing through the following September billing, when the consumer has demonstrated postive load reduction during Notification Periods, an Interruptible Credit, which will be subtracted from the charges for standard service, will be calculated in accordance with the following formula: IC = (BD - NPD) X ICR

374

Data:65270c31-1c09-4706-ba34-ee28e1fa4fd6 | Open Energy Information  

Open Energy Info (EERE)

1-1c09-4706-ba34-ee28e1fa4fd6 1-1c09-4706-ba34-ee28e1fa4fd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-1 STREET AND HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 150W Sector: Lighting Description: APPLICABILITY Applicable to service to street and highway lighting installations supplied from overhead lines, where the District owns and maintains the entire equipment. Monthly Usage: 65kWh Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2577 Source Parent:

375

Data:1610211f-2f08-4725-ae48-a3b41d1e1b73 | Open Energy Information  

Open Energy Info (EERE)

2f08-4725-ae48-a3b41d1e1b73 2f08-4725-ae48-a3b41d1e1b73 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elk Point, South Dakota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights- (250W) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

376

Data:0ea2fe17-e1f8-4703-a420-13f7ad9797e6 | Open Energy Information  

Open Energy Info (EERE)

7-e1f8-4703-a420-13f7ad9797e6 7-e1f8-4703-a420-13f7ad9797e6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Cooperative Furnished Investment 400 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

377

Data:D61f73e1-f25e-468e-bf59-7c4956356b05 | Open Energy Information  

Open Energy Info (EERE)

e1-f25e-468e-bf59-7c4956356b05 e1-f25e-468e-bf59-7c4956356b05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - HPS 400w 2 Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

378

Data:0334a518-3a1c-45b3-b007-bb191e1a83ba | Open Energy Information  

Open Energy Info (EERE)

18-3a1c-45b3-b007-bb191e1a83ba 18-3a1c-45b3-b007-bb191e1a83ba No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: R-ETS - Residential ETS Service Sector: Residential Description: Applicable to Residences: A single family residence dwelling or building with an electric thermal storage system consisting of an air source heat pump or ground source heat pump sized to heating load with an approved electric thermal storage device and an electric water heater, all to be included in Platte-Clay's Electric Coop load management system.

379

Data:Adefaa86-e92f-48f8-b6d7-8205ad6e1b69 | Open Energy Information  

Open Energy Info (EERE)

Adefaa86-e92f-48f8-b6d7-8205ad6e1b69 Adefaa86-e92f-48f8-b6d7-8205ad6e1b69 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntingburg, Indiana (Utility Company) Effective date: 2007/01/01 End date if known: Rate name: Municipal Street Lighting- (250 W Security) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

380

Data:7d5a5612-3260-4221-b723-6f034d6fe8e1 | Open Energy Information  

Open Energy Info (EERE)

2-3260-4221-b723-6f034d6fe8e1 2-3260-4221-b723-6f034d6fe8e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Electric Vehicle Charging Service Sector: Residential Description: When service is supplied to a residence where the service is used to charge an Electric Vehicle and where the utility has installed a meter capable of registering on and off-peak usage the following rate shall apply. Source or reference: www.baycitymi.org/images/Department/electric/Proposed_2013_Electric_Service_Rate_Schedule.pdf

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:1d35f540-3803-4418-bfe2-a323df1c7e1b | Open Energy Information  

Open Energy Info (EERE)

5f540-3803-4418-bfe2-a323df1c7e1b 5f540-3803-4418-bfe2-a323df1c7e1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Halifax Electric Member Corp Effective date: 2011/08/01 End date if known: Rate name: RENEWABLE ENERGY GENERATION-Solar Sector: Description: AVAILABILTY This Rider is available to residential and nonresidential Members receiving electric service from the Cooperative when a solar, wind-powered, or biomass-fueled generation source is installed on the Member's side of the delivery point and operated in parallel with the Cooperative's distribution system. The Member must submit an application and receive approval prior to interconnection of generating facilities with the Cooperative's system.

382

Data:Dec81d5b-466f-4835-8e1f-10647244fd5c | Open Energy Information  

Open Energy Info (EERE)

Dec81d5b-466f-4835-8e1f-10647244fd5c Dec81d5b-466f-4835-8e1f-10647244fd5c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No2 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: General Service Rate Schedule No. GS3 (Closed) Sector: Industrial Description: Applicability: Applicable to retail and wholesale customers under 500 kW of demand, engaged in the sale, fabrication or manufacture of any product or commodity. Source or reference: http://www.ed2.com/Docs/Rates/General%20Service%20-%20Industrial%20Rate%20Schedule%20GS3.pdf Source Parent: Comments Applicability

383

Data:9aad258e-a368-42e1-9d50-a1de86486ee2 | Open Energy Information  

Open Energy Info (EERE)

e-a368-42e1-9d50-a1de86486ee2 e-a368-42e1-9d50-a1de86486ee2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Extra Large Industrial Service Sector: Industrial Description: To any non-agricultural customers whose monthly maximum demand is greater than 3000 kW for 3 consecutive months. Source or reference: ISU Documentation Source Parent: Comments The bill is subject to a power supply adjuster as set forth in the District's power cost adjuster rate tariff. Applicability Demand (kW) Minimum (kW): Maximum (kW):

384

Data:8aa5bbd2-7ffd-4329-814b-b04e1d704ab2 | Open Energy Information  

Open Energy Info (EERE)

bbd2-7ffd-4329-814b-b04e1d704ab2 bbd2-7ffd-4329-814b-b04e1d704ab2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Liberty, Texas (Utility Company) Effective date: End date if known: Rate name: Large Commercial Sector: Commercial Description: *Subject to fuel cost adjustment. Note: Demand Decimal Figure and Multiplier can be obtained from the Utility Billing Department. The demand charge is based on the multiplier on the account. The Total Demand Factor is calculated as follows: Demand Decimal Figure x Multiplier - 15 x $6.24 Source or reference: http://www.cityofliberty.org/Departments/Finance/Billing_Rates/Electrical_Service_Rates.aspx

385

Data:1bc22f5e-5822-45da-99e1-5fa76b04164c | Open Energy Information  

Open Energy Info (EERE)

2f5e-5822-45da-99e1-5fa76b04164c 2f5e-5822-45da-99e1-5fa76b04164c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2013/01/01 End date if known: Rate name: Rate MH - Underground colonial 175 Watt Sector: Lighting Description: Source or reference: www.uinet.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

386

Data:7e45cb04-6737-4524-a65f-03034e1b03be | Open Energy Information  

Open Energy Info (EERE)

4-6737-4524-a65f-03034e1b03be 4-6737-4524-a65f-03034e1b03be No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Petoskey, Michigan (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: YD Light 400W Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

387

Data:C8978d96-ccca-4e1f-afe8-8122eba2af15 | Open Energy Information  

Open Energy Info (EERE)

78d96-ccca-4e1f-afe8-8122eba2af15 78d96-ccca-4e1f-afe8-8122eba2af15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Washington, North Carolina (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Outdoor Lighting- 100W Metal Halide Flood- Existing Pole Sector: Lighting Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

388

Data:9040df58-c3ff-47e1-b5e9-e4fe28f484de | Open Energy Information  

Open Energy Info (EERE)

df58-c3ff-47e1-b5e9-e4fe28f484de df58-c3ff-47e1-b5e9-e4fe28f484de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: Small Commercial- Irrigation Pasture Outside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

389

Data:04b78ae2-e1a6-4446-bcfb-a05b9f02dfbc | Open Energy Information  

Open Energy Info (EERE)

e1a6-4446-bcfb-a05b9f02dfbc e1a6-4446-bcfb-a05b9f02dfbc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Clallam County Effective date: 2012/02/01 End date if known: Rate name: SCHEDULE E-4 LARGE GENERAL SERVICE Sector: Commercial Description: To commercial and individual customers including schools, public agencies and other users not eligible under other rate schedules where measured demand is at least 300kW during the year and less than 1,000kW at least ten times per year. Source or reference: http://www.clallampud.net/uploadedFiles/Electric/documents/Elec_Rate_Schedule.pdf

390

Data:38ab02a6-53a8-4f49-9f55-9ae494e1fdeb | Open Energy Information  

Open Energy Info (EERE)

-53a8-4f49-9f55-9ae494e1fdeb -53a8-4f49-9f55-9ae494e1fdeb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Union City, Tennessee (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: http://www.uces.org/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

391

Data:0c807d18-213e-4837-966e-8e1e9d7d51c4 | Open Energy Information  

Open Energy Info (EERE)

-213e-4837-966e-8e1e9d7d51c4 -213e-4837-966e-8e1e9d7d51c4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Customer-Owned Fixture - Decorative 100 Watt HPS Acorn Dark Skies Adder Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

392

Data:C397a4c8-9425-4984-98d3-49da244a4e1e | Open Energy Information  

Open Energy Info (EERE)

c8-9425-4984-98d3-49da244a4e1e c8-9425-4984-98d3-49da244a4e1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2010/10/01 End date if known: Rate name: General Service, Separately Metered Electric Water Heating Price Schedule GWN Sector: Commercial Description: Available In the Company's Iowa electric service area (North System only). Source or reference: http://www.midamericanenergy.com/include/pdf/rates/elecrates/iaelectric/ia-elec.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

393

Data:7888aa3a-8ffe-42e1-ab78-910d624d9487 | Open Energy Information  

Open Energy Info (EERE)

aa3a-8ffe-42e1-ab78-910d624d9487 aa3a-8ffe-42e1-ab78-910d624d9487 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lea County Electric Coop, Inc Effective date: 2009/08/30 End date if known: Rate name: Cottin Gin Service Sector: Residential Description: Available system wide for cotton gins. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

394

Data:7d21d72d-68e1-4a07-9095-751dc8ff3564 | Open Energy Information  

Open Energy Info (EERE)

1d72d-68e1-4a07-9095-751dc8ff3564 1d72d-68e1-4a07-9095-751dc8ff3564 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Huntingburg, Indiana (Utility Company) Effective date: 2007/01/01 End date if known: Rate name: Municipal Street Lighting- (Incandescent 2500 lumen) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

395

Data:49f00575-e849-4f3d-b8ef-67dfe75e1c19 | Open Energy Information  

Open Energy Info (EERE)

575-e849-4f3d-b8ef-67dfe75e1c19 575-e849-4f3d-b8ef-67dfe75e1c19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Residential Sector: Residential Description: This schedule is available only to customers dwelling in residences, condominiums, mobile homes, or individually-metered apartments which provide independent and permanent facilities complete for living, sleeping, eating, cooking, and sanitation. Source or reference: http://www.concordnc.gov/LinkClick.aspx?fileticket=53Al67tluGU%3d&tabid=580&mid=1145

396

Data:Bae432c9-e5e1-4135-8294-394e449dbd6e | Open Energy Information  

Open Energy Info (EERE)

Bae432c9-e5e1-4135-8294-394e449dbd6e Bae432c9-e5e1-4135-8294-394e449dbd6e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Urban Residential Service Sector: Residential Description: To occupied single-family dwellings, apartments, condominiums, and mobile homes (that have towing devices removed) that are individually metered within the city limits of the City of Auburn, Nebraska. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW)

397

Data:6911d07c-7b7f-4e1a-b653-8d35a159acff | Open Energy Information  

Open Energy Info (EERE)

c-7b7f-4e1a-b653-8d35a159acff c-7b7f-4e1a-b653-8d35a159acff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 23ft fiberlass pole with shroud Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

398

Data:Fbf987e1-8f13-4cb4-9fbc-4a07f793de57 | Open Energy Information  

Open Energy Info (EERE)

e1-8f13-4cb4-9fbc-4a07f793de57 e1-8f13-4cb4-9fbc-4a07f793de57 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wright-Hennepin Coop Elec Assn Effective date: End date if known: Rate name: Commercial Sector: Commercial Description: The Commercial & Industrial Rate is applicable to those customers having an average monthly electric peak of 25 kW or greater, AND have an average monthly energy usage of 5000 kWh or greater. The major components of the rate (billed monthly) are as follows: Source or reference: http://www.whe.org/for-my-business/payment-information/programs-and-rates.html

399

Data:01b9202e-1b10-44b7-abda-1e05136b8115 | Open Energy Information  

Open Energy Info (EERE)

202e-1b10-44b7-abda-1e05136b8115 202e-1b10-44b7-abda-1e05136b8115 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Washington Elec Member Corp Effective date: End date if known: Rate name: Rate-GSS-1 Sector: Description: Available to xxxxxxxxxxxxxxxxxxxxx in accordance with the Corporation's Service Rules and Regulations and subject to the execution of a contract for service mutually agreed upon by the Corporation and the Member. Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=129296 Source Parent: Comments rates have been redacted Applicability Demand (kW) Minimum (kW):

400

Data:6b3ab8ac-5df2-46e1-8621-fa50588f95b6 | Open Energy Information  

Open Energy Info (EERE)

ac-5df2-46e1-8621-fa50588f95b6 ac-5df2-46e1-8621-fa50588f95b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whetstone Valley Elec Coop Inc Effective date: 2012/01/01 End date if known: Rate name: Rental Lighting 250 watt Sector: Lighting Description: Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:4feee115-31de-4cba-b0f7-733700e1cae8 | Open Energy Information  

Open Energy Info (EERE)

feee115-31de-4cba-b0f7-733700e1cae8 feee115-31de-4cba-b0f7-733700e1cae8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (250 FL Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

402

Data:1db1e165-4529-44eb-baff-9571a1e1ca7b | Open Energy Information  

Open Energy Info (EERE)

65-4529-44eb-baff-9571a1e1ca7b 65-4529-44eb-baff-9571a1e1ca7b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sharyland Utilities LP Effective date: 2010/07/13 End date if known: Rate name: Lighting Service unmetered company owned SV Sector: Lighting Description: This Rate Schedule is applicable to Electric Service for street and security lighting purposes. This Rate Schedule is not applicable to temporary, shared, standby, supplementary, maintenance or resale service. Source or reference: http://www.su-power.com/docs/SharylandUtilities_Tariff.pdf Source Parent: Comments This rate is subject to all applicable billing adjustments (Power Cost Recovery Factor (PCRF) - General, Sales Tax, Meter Error Adjustment, Power Factor Adjustment)

403

Data:Baf7195f-f419-4861-9c6a-e1ffda04c71b | Open Energy Information  

Open Energy Info (EERE)

Baf7195f-f419-4861-9c6a-e1ffda04c71b Baf7195f-f419-4861-9c6a-e1ffda04c71b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Electric Heat Suburban Residential Sector: Residential Description: To all customers for such service when separately metered upon application and approval of permanently installed equipment; subject to such rules and regulations as are established by the utility. When air conditioning is installed in an electrically heated area, it may be connected to the same meter for space conditioning purposes.

404

Data:14ebd92d-7841-4e1e-b5f9-afa29d861d1f | Open Energy Information  

Open Energy Info (EERE)

ebd92d-7841-4e1e-b5f9-afa29d861d1f ebd92d-7841-4e1e-b5f9-afa29d861d1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Georgetown, Ohio (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

405

Data:5583d7dc-6523-48ae-9e1e-816d9b499b2b | Open Energy Information  

Open Energy Info (EERE)

d7dc-6523-48ae-9e1e-816d9b499b2b d7dc-6523-48ae-9e1e-816d9b499b2b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sioux Falls, South Dakota (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Night Watch Flood Service Rate HPS 400W Sector: Lighting Description: The night watch flood service rate for electrical service shall be as follows: Applicable: For any customer for illumination of private property. Source or reference: http://www.siouxfalls.org/public-works/utility-billing/electric-rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW):

406

Data:8b4a903b-0bd1-4c88-bfe2-64108e1cdbd5 | Open Energy Information  

Open Energy Info (EERE)

a903b-0bd1-4c88-bfe2-64108e1cdbd5 a903b-0bd1-4c88-bfe2-64108e1cdbd5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oahe Electric Coop Inc Effective date: 2009/01/01 End date if known: Rate name: Outdoor Lighting 175 W MV: Metered Sector: Lighting Description: Available to individual consumers and municipalities, towns, and villages for dusk to dawn outdoor lighting in close proximity to existing overhead secondary circuits. South Dakota Sales Tax is applicable to this rate. Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW):

407

Data:3eb7be91-a55b-4a1e-9cd9-8854a7168e1e | Open Energy Information  

Open Energy Info (EERE)

eb7be91-a55b-4a1e-9cd9-8854a7168e1e eb7be91-a55b-4a1e-9cd9-8854a7168e1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: French Broad Elec Member Corp Effective date: 2011/09/01 End date if known: Rate name: Residential Generation Sector: Residential Description: Plus Wholesale Purchase Power Fuel Charge (Or Credit) and Sales Tax where applicable. Source or reference: http://www.frenchbroademc.com/rateschedule.cfm Source Parent: Comments The Flat rate Adjustment is the generational credit($/kwh generated) Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

408

Data:28ef6517-4f04-4e1f-acd2-f6bda425af4c | Open Energy Information  

Open Energy Info (EERE)

-4f04-4e1f-acd2-f6bda425af4c -4f04-4e1f-acd2-f6bda425af4c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING, Wood Pole (kWh - 10, Consumers Per Light - 4) Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

409

Data:Deb3864b-9e1c-4f36-a95f-76c75e786918 | Open Energy Information  

Open Energy Info (EERE)

Deb3864b-9e1c-4f36-a95f-76c75e786918 Deb3864b-9e1c-4f36-a95f-76c75e786918 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Coop Owns/Repairs HPS 100 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

410

Data:76e9d755-429f-437a-b769-5528e1ac48b7 | Open Energy Information  

Open Energy Info (EERE)

-429f-437a-b769-5528e1ac48b7 -429f-437a-b769-5528e1ac48b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Private Area Light-150W(On Existing Pole-100% Cooperative Investment Option) Sector: Lighting Description: Unmetered Facilities. The average consumption per month is 60kWh Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

411

Data:C4e629a9-ce4c-49c8-af2d-e1d7245d85ef | Open Energy Information  

Open Energy Info (EERE)

9a9-ce4c-49c8-af2d-e1d7245d85ef 9a9-ce4c-49c8-af2d-e1d7245d85ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule B - Small General Service - City of Fife Sector: Commercial Description: For Nonresidential lighting, heating, and incidental power uses where demand meter may be installed. Also for nonresidential incidental powers uses where a meter is not installed. Source or reference: www.mytpu.org/file_viewer.aspx?id=6167 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

412

Data:Fca538e1-3c96-4cbe-b125-478880b00922 | Open Energy Information  

Open Energy Info (EERE)

Fca538e1-3c96-4cbe-b125-478880b00922 Fca538e1-3c96-4cbe-b125-478880b00922 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2012/11/01 End date if known: Rate name: LIGHTING--SCHEDULE LS--Rate SL 150 watt High Pressure Sodium Flood or Metal Halide Sector: Description: Availability A member must be receiving electric service to be eligible for a security light at that location. Character of Service Mercury Vapor, High Pressure Sodium Metal Halide light, or Sodium Edison III controlled by a photoelectric switch so as to provide light from sundown to sunup.

413

Data:E06ddda3-e1e7-41e9-a600-70dbb9018e9b | Open Energy Information  

Open Energy Info (EERE)

ddda3-e1e7-41e9-a600-70dbb9018e9b ddda3-e1e7-41e9-a600-70dbb9018e9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Outdoor Rental Lighting Service- Decorative Security Lights- (100W HPS Contemporary Wood) Sector: Lighting Description: Available for outdoor lighting of yards, walkways and other areas. Lights to be served hereunder shall be at locations that are easily and economically accessible to Utility equipment and personnel for construction and maintenance. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181

414

Data:86ea31bc-12dc-4e1f-ac1f-851f84f656f5 | Open Energy Information  

Open Energy Info (EERE)

bc-12dc-4e1f-ac1f-851f84f656f5 bc-12dc-4e1f-ac1f-851f84f656f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: End date if known: Rate name: INSTITIONAL SERVICE RATE 75000 NON- ELECTRIC Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

415

Data:507de18e-e1e6-441f-89ac-84865627f783 | Open Energy Information  

Open Energy Info (EERE)

e1e6-441f-89ac-84865627f783 e1e6-441f-89ac-84865627f783 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Central Oklahoma Elec Coop Inc Effective date: 1995/12/01 End date if known: Rate name: Security Lighting Service-400W Mercury Vapor Customer-Owned & Maintained Sector: Lighting Description: Available upon application to all consumers for illumination of outdoor areas at any point on or near the Cooperative's distribution or service lines. Source or reference: Rate Binder B #4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

416

Data:1a8b1adc-8132-42e1-bbc6-37cbe8433d4a | Open Energy Information  

Open Energy Info (EERE)

adc-8132-42e1-bbc6-37cbe8433d4a adc-8132-42e1-bbc6-37cbe8433d4a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Valley Elec Coop, Inc Effective date: 2009/02/01 End date if known: Rate name: SL- 400 Watt MV 169 kWh (Steel Pole Underground) Sector: Lighting Description: Source or reference: http://www.cvecoop.org/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

417

Data:3519d3ba-8f6d-48af-8121-3423e1d2f6b0 | Open Energy Information  

Open Energy Info (EERE)

ba-8f6d-48af-8121-3423e1d2f6b0 ba-8f6d-48af-8121-3423e1d2f6b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Glasgow, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Outdoor Light- 100W High Pressure Sodium Sector: Lighting Description: Source or reference: http://www.glasgowepb.net/EPBrates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

418

Data:B2a7fb75-ea12-4fc3-868e-1c201e95941d | Open Energy Information  

Open Energy Info (EERE)

fb75-ea12-4fc3-868e-1c201e95941d fb75-ea12-4fc3-868e-1c201e95941d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Stanton County Public Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: Municipal Street Lighting District Owned Non Metered 60W LED Sector: Lighting Description: Source or reference: ISU Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

419

Data:3bc395aa-e0aa-41bb-8e1c-c004bea10d15 | Open Energy Information  

Open Energy Info (EERE)

95aa-e0aa-41bb-8e1c-c004bea10d15 95aa-e0aa-41bb-8e1c-c004bea10d15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: High-Pressure Sodium-70 watts Sector: Lighting Description: Service under this rate is available for street and area lighting service installations, maintenance and use of energy, and traffic control lighting service provided the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost. bundled TD&S monthly rate included

420

Data:25345c67-a9d6-430d-ba28-a86c7e1a8ffe | Open Energy Information  

Open Energy Info (EERE)

-a9d6-430d-ba28-a86c7e1a8ffe -a9d6-430d-ba28-a86c7e1a8ffe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Effective date: End date if known: Rate name: Outdoor Lighting Nonmetered Memb Owns/Repairs HPS 100 W Sector: Lighting Description: Source or reference: http://www.consumersenergy.coop/programs.php?pn=Security%20Lights&pl=securitylights Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:Fedb88d7-e5e1-4d9d-9e36-c844e9d11415 | Open Energy Information  

Open Energy Info (EERE)

Fedb88d7-e5e1-4d9d-9e36-c844e9d11415 Fedb88d7-e5e1-4d9d-9e36-c844e9d11415 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (1000W HPS-Flood) Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

422

Data:6e760e45-91ca-4533-a3e1-440891cdc220 | Open Energy Information  

Open Energy Info (EERE)

60e45-91ca-4533-a3e1-440891cdc220 60e45-91ca-4533-a3e1-440891cdc220 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2010/06/30 End date if known: Rate name: R2 Nightwatchers - HPS unshielded - 250W Open Sector: Lighting Description: To un-metered automatically controlled outdoor lightning service burning all night. Source or reference: http://www.entergy-arkansas.com/content/price/tariffs/eai_l4.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

423

Data:D8f5fd10-7740-46e1-b572-81bc75294f87 | Open Energy Information  

Open Energy Info (EERE)

fd10-7740-46e1-b572-81bc75294f87 fd10-7740-46e1-b572-81bc75294f87 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Public Street and Highway Ornamental Lighting- Acorn or Coach Lantern- 12000 Luemen High Pressure Sodium Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility. Source or reference: http://www.rivierautilities.com/pdf/rates/rate_610_2012_03.pdf

424

Data:C40ceeb5-c3e1-4067-9cf7-46b2bbedc4ee | Open Energy Information  

Open Energy Info (EERE)

ceeb5-c3e1-4067-9cf7-46b2bbedc4ee ceeb5-c3e1-4067-9cf7-46b2bbedc4ee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lawrenceburg, Tennessee (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Residential Service Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

425

Data:1f63723b-c4dd-4247-b887-58e1ec46ddc6 | Open Energy Information  

Open Energy Info (EERE)

b-c4dd-4247-b887-58e1ec46ddc6 b-c4dd-4247-b887-58e1ec46ddc6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Moorhead, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: General Service Primary Sector: Commercial Description: Available to any customer other than a single, private residence. Single- or three-phase service at standard distribution or primary voltages. Small General Service customers may choose to be billed at the General Service rate. When use exceeds 10,000 kWh per month: Source or reference: http://www.mpsutility.com/images/stories/rates/2013/Electric%20Rates.pdf

426

Data:8f9670ac-c77f-4135-a5ed-7e1b27742ce8 | Open Energy Information  

Open Energy Info (EERE)

ac-c77f-4135-a5ed-7e1b27742ce8 ac-c77f-4135-a5ed-7e1b27742ce8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawkeye Tri-County El Coop Inc Effective date: 2012/06/01 End date if known: Rate name: Commercial Rate Sector: Commercial Description: 50 kVa or greater transformer size) Source or reference: http://www.hawkeyerec.com/downloads/Rates_and_Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

427

Data:2343b505-b866-48e1-8d46-2ba776e310cc | Open Energy Information  

Open Energy Info (EERE)

05-b866-48e1-8d46-2ba776e310cc 05-b866-48e1-8d46-2ba776e310cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northwestern Rural E C A, Inc Effective date: 2013/01/01 End date if known: Rate name: Three Phase Over 1,000 KVA Sector: Commercial Description: AVAILABILITY Any large power service with transformer capacity greater than 1,000 KVA. Service hereunder shall be subject to the cooperative's established rules and regulations. TYPE OF SERVICE Three phase, 60 hertz, at standard primary or secondary distribution voltages. Source or reference: http://www.northwesternrec.com/myHome/billingAndPayments/rates.aspx

428

Data:1cd145e6-23e1-41d1-973c-344734e473ec | Open Energy Information  

Open Energy Info (EERE)

45e6-23e1-41d1-973c-344734e473ec 45e6-23e1-41d1-973c-344734e473ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dixie Electric Power Assn Effective date: End date if known: Rate name: Distributed Generation Rider Sector: Residential Description: *Applicable to Residential Single Phase or Non-Residential Single Phase Distributed Generation 10 kW or less of connected generation connected in parallel operation to the Association's lines in accordance with the Association's Service Rules and Regulations and the Association's Agreement for Interconnection and Parallel Operation of Distributed Generation (DG) (For Residential Distributed Generation 10 kW or Less), which is available on request.

429

Data:84945816-e1e8-404a-a54a-4c1cfde76bc6 | Open Energy Information  

Open Energy Info (EERE)

e1e8-404a-a54a-4c1cfde76bc6 e1e8-404a-a54a-4c1cfde76bc6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Commercial Demand Rate Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

430

Data:1c0f495d-a569-458c-ae34-04e1ce904207 | Open Energy Information  

Open Energy Info (EERE)

a569-458c-ae34-04e1ce904207 a569-458c-ae34-04e1ce904207 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Richland Electric Coop Effective date: End date if known: Rate name: Rental Security Lighting- Unmetered Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

431

Data:Dc5e1c63-7091-4640-ae06-5c4f65750e98 | Open Energy Information  

Open Energy Info (EERE)

Dc5e1c63-7091-4640-ae06-5c4f65750e98 Dc5e1c63-7091-4640-ae06-5c4f65750e98 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Natchez Trace Elec Power Assn Effective date: End date if known: Rate name: Outdoor Lighting MV 1000 W Dedicated Transformer Sector: Lighting Description: Source or reference: http://www.ntepa.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

432

Data:Cff52db7-823a-492c-a288-8efee48bb6e1 | Open Energy Information  

Open Energy Info (EERE)

Cff52db7-823a-492c-a288-8efee48bb6e1 Cff52db7-823a-492c-a288-8efee48bb6e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Howard Greeley Rural P P D Effective date: End date if known: Rate name: Village General Service Miscelllaneous Municipal Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

433

Data:Ee88b6e3-4eda-403f-b0cc-0d550213e1cd | Open Energy Information  

Open Energy Info (EERE)

b6e3-4eda-403f-b0cc-0d550213e1cd b6e3-4eda-403f-b0cc-0d550213e1cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rita Blanca Electric Coop, Inc Effective date: 2009/01/01 End date if known: Rate name: Commercial Large Power Sector: Commercial Description: *The Cooperative applies an adjustment factor each month to recover the amount paid to its supplier for fuel to generate electricity during the preceding month. Subject to Power Factor Adjustment. Source or reference: http://ritablancaelectric.com/page5.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

434

Data:5e1f11a1-0856-46b3-9568-848ae0e87140 | Open Energy Information  

Open Energy Info (EERE)

e1f11a1-0856-46b3-9568-848ae0e87140 e1f11a1-0856-46b3-9568-848ae0e87140 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Greenwich, Ohio (Utility Company) Effective date: 2010/07/20 End date if known: Rate name: Residential- Single Phase Sector: Residential Description: The existing electrical distribution system is available for full domestic electric service, commercial service and industrial service. Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/greenwich_oh/codifiedordinancesofgreenwichohio?f=templates$fn=default.htm$3.0$vid=amlegal:greenwich_oh Source Parent:

435

Data:203ddf03-71ba-4a95-99e1-7d49c3393b4b | Open Energy Information  

Open Energy Info (EERE)

3-71ba-4a95-99e1-7d49c3393b4b 3-71ba-4a95-99e1-7d49c3393b4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Kittitas County Effective date: 2013/02/01 End date if known: Rate name: Large Commercial Service - Distribution (Single Phase) Sector: Commercial Description: Available to large single phase customers for all uses. Services connected under this schedule have a service entrance rating larger than 400A single phase and average usage greater than 35,000 kWh per month. Source or reference: http://www.kittitaspud.com/rate_schedule.php Source Parent: Comments Applicability

436

Data:04ec45ed-f05a-4e1a-bf13-3df2ddce8a8e | Open Energy Information  

Open Energy Info (EERE)

5ed-f05a-4e1a-bf13-3df2ddce8a8e 5ed-f05a-4e1a-bf13-3df2ddce8a8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: 2011/05/23 End date if known: Rate name: Street Lighting HPS 150w Sector: Lighting Description: APPLICABLE: To all public agencies for street lighting service which conforms to the System's street lighting specifications. CHARACTER OF SERVICE: The System will provide photocell controlled energy at 60 Hertz to all lighting systems and will construct, operate and maintain those lighting systems pursuant to agreements between the Customer and the System.

437

Data:8d24b11d-2e1d-4752-bdc9-94c5dd95e71b | Open Energy Information  

Open Energy Info (EERE)

b11d-2e1d-4752-bdc9-94c5dd95e71b b11d-2e1d-4752-bdc9-94c5dd95e71b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Piedmont Electric Member Corp Effective date: 2012/05/01 End date if known: Rate name: RESIDENTIAL SERVICE Three-Phase(RS-3) Sector: Residential Description: Renewable Energy Portfolio Standard (REPS) Adjustment: The consumer's monthly bill shall also include a REPS adjustment based upon the revenue classification of the account. The revenue classifications and monthly charges are shown in the Cooperative's Rider REPS. (REPS) Adjustment:Residential $ 0.35, this adjustment is included in the Fixed Monthly Charge listed below.

438

Data:4c24d43d-8222-4ef0-880f-a90c537e1e03 | Open Energy Information  

Open Energy Info (EERE)

d43d-8222-4ef0-880f-a90c537e1e03 d43d-8222-4ef0-880f-a90c537e1e03 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Franklin, Virginia (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Outdoor Lighting - HPS - 100w Sector: Lighting Description: * APPLICABILITY. This schedule is applicable to any Customer for outdoor lighting service, except where installations are prevented by any public authority having jurisdiction or are otherwise unlawful. Premium Fixture Rates (Municipal & Subdivision) 1. When the light fixture is not a security light or cobra head the rate shall be increased by the following fees:

439

Data:6afe1044-2cb9-44e4-9ca3-bfdce36818e1 | Open Energy Information  

Open Energy Info (EERE)

afe1044-2cb9-44e4-9ca3-bfdce36818e1 afe1044-2cb9-44e4-9ca3-bfdce36818e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 150W METAL HALIDE CUTOFF ACORN Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

440

Data:9a07bd75-887d-4a1f-b780-e1cbadc2617b | Open Energy Information  

Open Energy Info (EERE)

-887d-4a1f-b780-e1cbadc2617b -887d-4a1f-b780-e1cbadc2617b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Ms-2 Athletic Field Lighting Service Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:61a8d454-e1d3-4a4a-8331-6a41c648ca7a | Open Energy Information  

Open Energy Info (EERE)

4-e1d3-4a4a-8331-6a41c648ca7a 4-e1d3-4a4a-8331-6a41c648ca7a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Genoa, Ohio (Utility Company) Effective date: End date if known: Rate name: Small Commercial Demand Service (Three Phase) Sector: Commercial Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1

442

Data:Be9ba20b-46dd-492c-9b1f-8e1d4f72c748 | Open Energy Information  

Open Energy Info (EERE)

0b-46dd-492c-9b1f-8e1d4f72c748 0b-46dd-492c-9b1f-8e1d4f72c748 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: "SGS-ND" & "MGS-S" SH (UnBundled) Sector: Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

443

Data:A815ed43-b3e0-43e1-9968-908984242d17 | Open Energy Information  

Open Energy Info (EERE)

ed43-b3e0-43e1-9968-908984242d17 ed43-b3e0-43e1-9968-908984242d17 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Small Three-Phase Sector: Commercial Description: * Small 3 Phase- Ag/Non Profit. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

444

Data:7e26dcdf-b1f3-4062-8971-58a620e247e1 | Open Energy Information  

Open Energy Info (EERE)

dcdf-b1f3-4062-8971-58a620e247e1 dcdf-b1f3-4062-8971-58a620e247e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE G-1 THREE PHASE (SMALL GENERAL SERVICE) Sector: Commercial Description: Customer's maximum metered demand is less than 20.0 k W. Source or reference: http://www.concordma.gov/pages/ConcordMA_LightPlant/CMLP_new_rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

445

Data:1d7e3367-c514-4978-8e1d-1424adc1cb14 | Open Energy Information  

Open Energy Info (EERE)

c514-4978-8e1d-1424adc1cb14 c514-4978-8e1d-1424adc1cb14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W HPS-Open, UNDERGROUND WIRING, Wood Pole Sector: Lighting Description: Applicable to street and highway lighting owned by federal, state, or local governments or agencies thereof and to street lighting in residential subdivisions, apartment or condominium complexes, and mobile home parks by ballast operated vapor light fixtures and poles conforming to the Cooperative's specifications.

446

Data:D60cd2e1-ccf0-4f66-9516-f1379b491457 | Open Energy Information  

Open Energy Info (EERE)

cd2e1-ccf0-4f66-9516-f1379b491457 cd2e1-ccf0-4f66-9516-f1379b491457 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2005/09/28 End date if known: Rate name: 2 Large power service (LPS - TOD) - (transmission 69/138kV voltage) Sector: Industrial Description: This rate is applicable on a voluntary basis under the regular terms and conditions of the company to customers who contract for not less then 2500 kW of electric service at company's available line voltage. Source or reference: www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_lps-tod.pdf

447

Data:1b0f9865-0e54-44de-a737-c2e1e96d5716 | Open Energy Information  

Open Energy Info (EERE)

0e54-44de-a737-c2e1e96d5716 0e54-44de-a737-c2e1e96d5716 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Private Outdoor Security Lighting- 250W High Pressure Sodium Sector: Lighting Description: This schedule is available at any point on the Energy Department electric system where facilities of adequate capacity and standard lighting voltage levels are available. Source or reference: http://secure.provocitypower.com/Schedule%2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

448

Data:F742f345-9afb-4357-8152-09e5be6e1b9c | Open Energy Information  

Open Energy Info (EERE)

45-9afb-4357-8152-09e5be6e1b9c 45-9afb-4357-8152-09e5be6e1b9c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting SENU 9500 Sector: Commercial Description: Source or reference: http://www.loup.com/docs/customersvc/LLS-Rates2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1

449

Data:234e01e1-2dcc-4bf0-bd78-5a2f5d24d331 | Open Energy Information  

Open Energy Info (EERE)

e1-2dcc-4bf0-bd78-5a2f5d24d331 e1-2dcc-4bf0-bd78-5a2f5d24d331 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sylvania, Georgia (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: Commercial Electric Sector: Commercial Description: Source or reference: Rate Binder #2 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

450

Data:3babcbb4-d20e-4e02-b496-19e1aeda5804 | Open Energy Information  

Open Energy Info (EERE)

babcbb4-d20e-4e02-b496-19e1aeda5804 babcbb4-d20e-4e02-b496-19e1aeda5804 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sun River Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Security Lighting - 400 watt MV - Additional Pole Sector: Lighting Description: * Single phase at available voltage. Available for automatic dusk-to-dawn lighting when cooperative furnishes all material, maintenance and electric energy. Source or reference: http://www.sunriverelectric.coop/Membership/Billing_Rates_and_Fees/Security_Lighting/index.html Source Parent: Comments Applicability Demand (kW)

451

Data:E8edc91b-a3a7-41e1-ac14-6a285a282057 | Open Energy Information  

Open Energy Info (EERE)

edc91b-a3a7-41e1-ac14-6a285a282057 edc91b-a3a7-41e1-ac14-6a285a282057 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (250W HPS-Open/Closed) Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation Source Parent: Comments

452

Data:046a9213-4a6e-43e1-94ac-20a0c118b388 | Open Energy Information  

Open Energy Info (EERE)

13-4a6e-43e1-94ac-20a0c118b388 13-4a6e-43e1-94ac-20a0c118b388 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Private Street and Area Lighting (PSL-10) metered HPS 250W Sector: Lighting Description: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

453

Data:B3c73985-5601-45ec-9758-c5e1a4b6f50d | Open Energy Information  

Open Energy Info (EERE)

c73985-5601-45ec-9758-c5e1a4b6f50d c73985-5601-45ec-9758-c5e1a4b6f50d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2013/09/01 End date if known: Rate name: Rate ITOU (Large Irrigation Pumping Time of Use) Sector: Commercial Description: Available to customers with connected pumping loads exceeding 50 horsepower. Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

454

Data:62368f88-46ef-4d79-8bf2-a2e1bd584186 | Open Energy Information  

Open Energy Info (EERE)

8-46ef-4d79-8bf2-a2e1bd584186 8-46ef-4d79-8bf2-a2e1bd584186 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Directional Flood HPS 150 W Non Wood Pole Sector: Lighting Description: Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

455

Data:4bb6cb5e-1e63-4999-a302-9826d5cfb09a | Open Energy Information  

Open Energy Info (EERE)

cb5e-1e63-4999-a302-9826d5cfb09a cb5e-1e63-4999-a302-9826d5cfb09a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Louisville Gas & Electric Co Effective date: 2013/06/01 End date if known: Rate name: LS - Contemporary 50000 lumens Decorative Smooth Sector: Lighting Description: Source or reference: www.lge-ku.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

456

Data:A01af4c4-f543-477c-89e1-18f32852eb36 | Open Energy Information  

Open Energy Info (EERE)

af4c4-f543-477c-89e1-18f32852eb36 af4c4-f543-477c-89e1-18f32852eb36 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 175 watt MV/MH - Pendant Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

457

Data:Ab7e8c9a-82e1-4568-a927-887123beb3f3 | Open Energy Information  

Open Energy Info (EERE)

c9a-82e1-4568-a927-887123beb3f3 c9a-82e1-4568-a927-887123beb3f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hull Municipal Light Plant Effective date: 2009/09/01 End date if known: Rate name: Small Power Rate 34 Sector: Commercial Description: Source or reference: http://www.town.hull.ma.us/Public_Documents/HullMA_Light/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

458

Data:0c0b05e1-bbd3-4647-8266-e51b258e2b45 | Open Energy Information  

Open Energy Info (EERE)

b05e1-bbd3-4647-8266-e51b258e2b45 b05e1-bbd3-4647-8266-e51b258e2b45 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bonners Ferry, Idaho (Utility Company) Effective date: 2009/10/01 End date if known: Rate name: Pumping & Drainage: S3PO Sector: Commercial Description: Note: $10.00 added to Fixed monthly charge if Remote Read Device is used. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

459

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Neutron Source Network Requirements Six DOE laboratories arehas networking requirements which differ from many other DOEhas networking requirements which differ from many other DOE

2006-01-01T23:59:59.000Z

460

Requirements and standards for organelle genome databases  

E-Print Network (OSTI)

to the complete genome sequencing of many other organisms (guide the transition from human genome sequencing to being a04334; and Phakopsora genome sequencing direct funding).

Boore, Jeffrey L.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "requires e1 transition" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.