Powered by Deep Web Technologies
Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Requirements for a Standard Test to Rate the Durability of PV Modules at System Voltage (Presentation)  

DOE Green Energy (OSTI)

Degradation modes in photovoltaic modules under system bias voltage stress are described and classified.

Hacke, P.; Terwilliger, K.; Glick, S.; Kempe, M.; Kurtz, S.; Bennett, I.; Kloos, M.

2011-02-01T23:59:59.000Z

2

Utilizing Bioenergy By-products in Beef Production Systems The newly expanded renewable fuels standard requires 36 billion gallons of renewable  

E-Print Network (OSTI)

Utilizing Bioenergy By-products in Beef Production Systems The newly expanded renewable fuels standard requires 36 billion gallons of renewable fuels be used annually by 2022, which allows continued

3

Requirements Governing Water Quality Standards (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements Governing Water Quality Standards (West Virginia) Requirements Governing Water Quality Standards (West Virginia) Requirements Governing Water Quality Standards (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Siting and Permitting This rule establishes the requirements governing the discharge or deposit of sewage, industrial wastes and other wastes into waters and establishes water quality standards.

4

The New 1999 National Electrical Code Coupled with New Standards Clarify Requirements for Installations of Photovoltaic Systems in the U.S.  

SciTech Connect

The National Electrical Code@ (NEC@) focuses primarily on electrical system installation requirements in the U.S. The NEC addresses both fire and personnel safety. This paper will describe recent efforts of the PV industry in the U.S. and the resulting requirements in the 1999 National Electrical Code-- Article 690 --Solar Photovoltaic Systems. The Article 690 requirements spell out the PV-unique requirements for safe installations of PV systems in the U.S.A. This paper provides an overview of the most significant changes that appear in Article 690 of the 1999 edition of the NEC. The related and coordinated efforts of the other standards- making groups will also be briefly reviewed.

Bower, W.

1999-01-08T23:59:59.000Z

5

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

6

Business System Planning Project System Requirements Specification  

SciTech Connect

The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

NELSON, R.E.

2000-09-08T23:59:59.000Z

7

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

8

Mechanical Systems Qualification Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61-2008 61-2008 June 2008 DOE STANDARD MECHANICAL SYSTEMS QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1161-2008 ii This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ DOE-STD-1161-2008 iv INTENTIONALLY BLANK DOE-STD-1161-2008 v TABLE OF CONTENTS ACKNOWLEDGMENT................................................................................................................ vii PURPOSE ....................................................................................................................................1

9

ASHRAE Standard 90.1-2007 -- Building Envelope Requirements ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements This course provides an overview of the building envelope requirements of ASHRAE Standard 90.1-2007. Estimated Length: 1 hour, 4 minutes Presenters: John Hogan, City...

10

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

11

B plant standards/requirements identification document (S/RID)  

Science Conference Proceedings (OSTI)

This Standards/Requirements Identification Document (S/RID) set forth the Environmental Safety and Health (ES{ampersand}H) standards/requirements for the B Plant. This S/RID is applicable to the appropriate life cycle phases of design, construction,operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

Maddox, B.S., Westinghouse Hanford

1996-07-29T23:59:59.000Z

12

ASHRAE Standard 90.1-2004 -- Lighting and Power Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

This course provides an overview of the lighting and power requirements of ASHRAE Standard 90.1-2004. Estimated Length: 50 minutes Presenters: Eric Richman, Pacific...

13

Specifying security requirements improvement for IEEE standard 830.  

E-Print Network (OSTI)

??This paper presents a concept on how the software requirements specifications template provided by IEEE Standard 830 could be updated to ensure that security is… (more)

McCarty, Jacob D.

2007-01-01T23:59:59.000Z

14

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

15

PV System Performance and Standards  

DOE Green Energy (OSTI)

This paper presents a brief overview of the status and accomplishments during fiscal year (FY) 2005 of the Photovoltaic (PV) System Performance and Standards Subtask, which is part of the PV Systems Engineering Project (a joint NREL-Sandia project).

Osterwald, C. R.

2005-11-01T23:59:59.000Z

16

Standard-C hydrogen monitoring system, system design description  

DOE Green Energy (OSTI)

Standard-C cabinet arrangement system design description for the Standard Hydrogen Monitoring System.

Schneider, T.C., Westinghouse Hanford

1996-08-29T23:59:59.000Z

17

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

18

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

19

ASHRAE Standard 90.1-2004 -- Building Envelope Requirements | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Envelope Requirements Building Envelope Requirements This course provides an overview of the building envelope requirements of ASHRAE Standard 90.1-2004. Estimated Length: 60 minutes Presenters: John Hogan, City of Seattle Original Webcast Date: Thursday, June 14, 2007 - 13:00 CEUs Offered: 1.0 AIA/CES LU (HSW); .10 CEUs towards ICC renewal certification. Course Type: Video Downloads: Presentation Slides Video Watch on YouTube Visit the BECP Online Training Center for instructions on how to obtain a certificate of completion. Building Type: Commercial Focus: Compliance Code Version: ASHRAE Standard 90.1-2004 Target Audience: Architect/Designer Builder Code Official Contractor Engineer State Official Contacts Web Site Policies U.S. Department of Energy USA.gov Last Updated: Wednesday, July 18, 2012 - 16:04

20

Analysis of Daylighting Requirements within ASHRAE Standard 90.1  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory (PNNL), under the Building Energy Codes Program (BECP) funded by U.S. Department of Energy (DOE), provides support to the ASHRAE/IES/IESNA Standard 90.1(Standard 90.1) Standing Standards Project Committee (SSPC 90.1) and its subcommittees. In an effort to provide the ASHRAE SSPC 90.1 with data that will improve the daylighting and fenestration requirements in the Standard, PNNL collaborated with Heschong Mahone Group (HMG), now part of TRC Solutions. Combining EnergyPlus, a whole-building energy simulation software developed by DOE, with Radiance, a highly accurate illumination modeling software (Ward 1994), the daylighting requirements within Standard 90.1 were analyzed in greater detail. The initial scope of the study was to evaluate the impact of the fraction of window area compared to exterior wall area (window-to-wall ratio (WWR)) on energy consumption when daylighting controls are implemented. This scope was expanded to study the impact of fenestration visible transmittance (VT), electric lighting controls and daylighted area on building energy consumption.

Athalye, Rahul A.; Xie, YuLong; Liu, Bing; Rosenberg, Michael I.

2013-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Process Control System Cyber Security Standards - An Overview  

Science Conference Proceedings (OSTI)

The use of cyber security standards can greatly assist in the protection of process control systems by providing guidelines and requirements for the implementation of computer-controlled systems. These standards are most effective when the engineers and operators, using the standards, understand what each standard addresses. This paper provides an overview of several standards that deal with the cyber security of process measurements and control systems.

Robert P. Evans

2006-05-01T23:59:59.000Z

22

Understanding Service Systems Through Standards  

E-Print Network (OSTI)

T. 2004. Economics of Standards in Information Networks.Kindleberger, C. P. 1983. Standards as Public, Collectivethe nature of today's standards. Presented at the “

Mathew, Ashwin J.

2008-01-01T23:59:59.000Z

23

American National Standard for Information Systems— Data ...  

Science Conference Proceedings (OSTI)

Page 1. Information Technology: American National Standard for Information Systems— Data Format for the Interchange of ...

2010-04-28T23:59:59.000Z

24

Standard-E hydrogen monitoring system shop acceptance test procedure  

DOE Green Energy (OSTI)

The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

Schneider, T.C.

1997-10-02T23:59:59.000Z

25

DOE-STD-1077-94; DOE Standard Training Accreditation Program Standard: Requirements and Guidelines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-94 7-94 August 1994 Supercedes DOE-STD-0101T, TAP-1, and DOE-STD-0103T, TAP-3 DOE STANDARD TRAINING ACCREDITATION PROGRAM STANDARD: REQUIREMENTS AND GUIDELINES U.S. Department of Energy Washington, D.C. 20585 FSC 6910 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE94018723 DOE-STD-1077-94 FOREWORD The Training Accreditation Program was established by the Department of Energy

26

American National Standard for Information Systems Data ...  

Science Conference Proceedings (OSTI)

Page 1. ANSI/NIST-ITL 1-2011 Update: 2013 Information Technology: American National Standard for Information Systems ...

2013-12-03T23:59:59.000Z

27

American National Standard for Information Systems Data ...  

Science Conference Proceedings (OSTI)

Page 1. ANSI/NIST-ITL 1-2011 Update 2013 Information Technology: American National Standard for Information Systems ...

2013-08-02T23:59:59.000Z

28

American National Standard for Information Systems— Data ...  

Science Conference Proceedings (OSTI)

Page 1. Information Technology: American National Standard for Information Systems— Data Format for the Interchange of Fingerprint ...

2012-09-11T23:59:59.000Z

29

American National Standard for Information Systems Data ...  

Science Conference Proceedings (OSTI)

Page 1. ANSI/NIST-ITL 1-2011 Information Technology: American National Standard for Information Systems Data Format ...

2012-01-09T23:59:59.000Z

30

American National Standard for Information Systems Data ...  

Science Conference Proceedings (OSTI)

Page 1. ANSI/NIST-ITL 1-2011 Update 2013 Information Technology: American National Standard for Information Systems ...

2013-07-08T23:59:59.000Z

31

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

32

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

33

Control Systems Security Standards: Accomplishments And Impacts |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Control Systems Security Standards: Accomplishments And Impacts Control Systems Security Standards: Accomplishments And Impacts Control Systems Security Standards: Accomplishments And Impacts This report describes the accomplishments and impacts of the standards team towards achieving these three goals and describes the follow-on efforts that need to be made toward meeting the priority strategies defined in the DOE/DHS Roadmap to Secure Control Systems in the Energy Sector. Control Systems Security Standards: Accomplishments & Impacts More Documents & Publications A Summary of Control System Security Standards Activities in the Energy Sector (October 2005) Roadmap to Secure Control Systems in the Energy Sector 2006 - Presentation to the 2008 ieRoadmap Workshop DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan

34

Computer systems and software description for Standard-E+ Hydrogen Monitoring System (SHMS-E+)  

DOE Green Energy (OSTI)

The primary function of the Standard-E+ Hydrogen Monitoring System (SHMS-E+) is to determine tank vapor space gas composition and gas release rate, and to detect gas release events. Characterization of the gas composition is needed for safety analyses. The lower flammability limit, as well as the peak burn temperature and pressure, are dependent upon the gas composition. If there is little or no knowledge about the gas composition, safety analyses utilize compositions that yield the worst case in a deflagration or detonation. Knowledge of the true composition could lead to reductions in the assumptions and therefore there may be a potential for a reduction in controls and work restrictions. Also, knowledge of the actual composition will be required information for the analysis that is needed to remove tanks from the Watch List. Similarly, the rate of generation and release of gases is required information for performing safety analyses, developing controls, designing equipment, and closing safety issues. This report outlines the computer system design layout description for the Standard-E+ Hydrogen Monitoring System.

Tate, D.D.

1997-05-01T23:59:59.000Z

35

Westinghouse Hanford Company (WHC) standards/requirements identification document (S/RID)  

Science Conference Proceedings (OSTI)

This Standards/Requirements Identification Document (S/RID) set forth the Environmental Safety and Health (ES&H) standards/requirements for Westinghouse Hanford Company Level Programs, where implementation and compliance is the responsibility of these organizations. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

Bennett, G.L.

1996-03-15T23:59:59.000Z

36

Standards for photovoltaic energy conversion systems. Final report  

DOE Green Energy (OSTI)

This report provides the results of a search for existing domestic standards and related documents for possible application in the development of a standards base for photovoltaic energy conversion systems. The search resulted in locating about 150 test methods, recommended practices, standards, solar-thermal performance criteria, and other standards-related documents. They are listed by topic areas in the appendix. The listing was prepared to assist those involved in developing performance criteria for photovoltaic systems and in identifying methods to test system performance against these criteria. It is clear from the results of the search that few standards are directly applicable to terrestrial solar photovoltaic systems and that much standards development is required to support the commercialization of such systems.

Schafft, H. A.

1980-04-01T23:59:59.000Z

37

Oklahoma Pollutant Discharge Elimination System (OPDES) Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Pollutant Discharge Elimination System (OPDES) Standards Oklahoma Pollutant Discharge Elimination System (OPDES) Standards (Oklahoma) Oklahoma Pollutant Discharge Elimination System (OPDES) Standards (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Tribal Government Utility Program Info State Oklahoma Program Type Environmental Regulations Provider Oklahoma Department of Environmental Quality This program of the Water Quality Division of the Department of Environmental Quality sets the point source, biosolids (sewage sludge), and stormwater permitting standards for discharges to the waters of the State

38

American National Standard for Information Systems — Data ...  

Science Conference Proceedings (OSTI)

Page 1. Part 2 March 2008 Draft ANSI/NIST-ITL 2-200X American National Standard 1 for Information Systems — 2 3 Data ...

2008-03-07T23:59:59.000Z

39

ETSI CLOUD - initial standardization requirements for cloud services  

Science Conference Proceedings (OSTI)

While the technological basis for cloud services is relatively mature, the development of the market is still at an early stage. There is considerable potential, but also a number of widely held concerns which are inhibiting mainstream adoption of cloud ... Keywords: ETSI, cloud services, standardization

Karsten Oberle; Mike Fisher

2010-08-01T23:59:59.000Z

40

HVAC System Design Strategies to Address Indoor Air Quality Standards  

Science Conference Proceedings (OSTI)

This report describes strategies that can be employed in the design and operation of heating, ventilating, and air conditioning (HVAC) systems to address the ASHRAE Standard 62 "Ventilation for Acceptable Indoor Air Quality" requirements. The report examines a wide variety of approaches to meeting the standard and their impact on energy consumption, occupant comfort, and other factors.

1999-12-09T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows 7, Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not...

42

LBNL Windows & Daylighting Software -- THERM: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not supported. (The...

43

System Assessment Standards: Defining the Market for Industrial Energy Assessments  

E-Print Network (OSTI)

2008. “System Assessment Standards: Defining the Market forL ABORATORY System Assessment Standards: Defining the Marketemployer. System Assessment Standards: Defining the Market

Sheaffer, Paul

2010-01-01T23:59:59.000Z

44

Control Systems Cyber Security Standards Support Activities  

Science Conference Proceedings (OSTI)

The Department of Homeland Security’s Control Systems Security Program (CSSP) is working with industry to secure critical infrastructure sectors from cyber intrusions that could compromise control systems. This document describes CSSP’s current activities with industry organizations in developing cyber security standards for control systems. In addition, it summarizes the standards work being conducted by organizations within the sector and provides a brief listing of sector meetings and conferences that might be of interest for each sector. Control systems cyber security standards are part of a rapidly changing environment. The participation of CSSP in the development effort for these standards has provided consistency in the technical content of the standards while ensuring that information developed by CSSP is included.

Robert Evans

2009-01-01T23:59:59.000Z

45

Codes, standards, and PV power systems. A 1996 status report  

SciTech Connect

As photovoltaic (PV) electrical power systems gain increasing acceptance for both off-grid and utility-interactive applications, the safety, durability, and performance of these systems gains in importance. Local and state jurisdictions in many areas of the country require that all electrical power systems be installed in compliance with the requirements of the National Electrical Code{reg_sign} (NEC{reg_sign}). Utilities and governmental agencies are now requiring that PV installations and components also meet a number of Institute of Electrical and Electronic Engineers (IEEE) standards. PV installers are working more closely with licensed electricians and electrical contractors who are familiar with existing local codes and installation practices. PV manufacturers, utilities, balance of systems manufacturers, and standards representatives have come together to address safety and code related issues for future PV installations. This paper addresses why compliance with the accepted codes and standards is needed and how it is being achieved.

Wiles, J

1996-06-01T23:59:59.000Z

46

Plutonium Finishing Plant (PFP) Standards/Requirements Identification Document (S/RID)  

Science Conference Proceedings (OSTI)

This Standards/Requirements Identification Document (S/RID) sets forth the Environmental Safety and Health (ESH) standards/requirements for the Plutonium Finishing Plant (PFP). This S/RID is applicable to the appropriate life cycle phases of design, construction, operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

Maddox, B.S.

1996-01-01T23:59:59.000Z

47

ISO 50001: A Global Energy Management System Standard  

E-Print Network (OSTI)

ISO 50001:2011 provides benefits for any organization to establish a framework to manage and improve energy consumption. The framework of ISO 50001:2011 enables organizations to establish the systems and processes necessary to improve energy performance, including energy efficiency, use, and consumption. This standard is expected to achieve major, long-term increases in energy efficiency in industrial, commercial, and institutional facilities and to reduce greenhouse gas emissions worldwide. The following paper describes the need for the international standard, its purpose, origins, review of key standard requirements including a comparison to existing management standards and the value of third party certification.

Chowdhury, N.

2013-01-01T23:59:59.000Z

48

LBNL Windows & Daylighting Software -- WINDOW: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Vista, Microsoft Windows 7, Microsoft Windows XP, Windows 2000TM.. It has been reported by users that the...

49

Advanced Metering Infrastructure (AMI) System Security Requirements  

Science Conference Proceedings (OSTI)

This report identifies key cyber security requirements and suggests basic security approaches for safeguarding the many interfaces of Advanced Metering Infrastructure (AMI) systems. These requirements, which were developed through a clearly defined security assessment procedure, are generic; but they can be used to develop more specific security requirements based on actual configurations and environments.

2009-12-21T23:59:59.000Z

50

Deriving Quantified Safety Requirements in Complex Systems  

Science Conference Proceedings (OSTI)

A variety of hazard analysis techniques have been proposed for software-based systems but individually the techniques are limited in their ability to cope with system complexity, or to derive and prioritise component safety requirements. There is also ...

Peter A. Lindsay; John A. McDermid; David J. Tombs

2000-10-01T23:59:59.000Z

51

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Windows 95, Windows 98, Windows 2000, Windows XP, or Windows NT CPU TYPE Pentium (a 133 MHz pentium will take about 40 seconds to perform a...

52

Overview of the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 |  

NLE Websites -- All DOE Office Websites (Extended Search)

the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 Session 2 of a seven-part webcast series presented by the Department of Energy's (DOE's) Federal Energy Management Program to help federal agencies comply with the requirements of ASHRAE Standard 90.1-2004. The Overview of the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 webcast is a re-broadcast of three webcasts-originally broadcast by DOE's Building Energy Codes Program in 2007. This training provides an overview of the building envelope, mechanical and service water heating, and lighting requirements in ASHRAE Standard 90.1-2004. Estimated Length: 4 hours Presenters: John Hogan, City of Seattle; Eric Richman, PNNL; Mark Hydeman, Taylor Engineering LLC. Original Webcast Date: Thursday, August 21, 2008 - 13:00

53

Procedures and Standards for Residential Ventilation System Commissioning:  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedures and Standards for Residential Ventilation System Commissioning: Procedures and Standards for Residential Ventilation System Commissioning: An Annotated Bibliography Title Procedures and Standards for Residential Ventilation System Commissioning: An Annotated Bibliography Publication Type Report LBNL Report Number LBNL-6142E Year of Publication 2013 Authors J. Chris Stratton, and Craig P. Wray Keywords ASHRAE 62.2, commissioning, procedures, residential, standards, ventilation Abstract Beginning with the 2008 version of Title 24, new homes in California must comply with ANSI/ASHRAE Standard 62.2-2007 requirements for residential ventilation. Where installed, the limited data available indicate that mechanical ventilation systems do not always perform optimally or even as many codes and forecasts predict. Commissioning such systems when they are installed or during subsequent building retrofits is a step towards eliminating deficiencies and optimizing the tradeoff between energy use and acceptable IAQ. Work funded by the California Energy Commission about a decade ago at Berkeley Lab documented procedures for residential commissioning, but did not focus on ventilation systems. Since then, standards and approaches for commissioning ventilation systems have been an active area of work in Europe. This report describes our efforts to collect new literature on commissioning procedures and to identify information that can be used to support the future development of residential-ventilation-specific procedures and standards. We recommend that a standardized commissioning process and a commissioning guide for practitioners be developed, along with a combined energy and IAQ benefit assessment standard and tool, and a diagnostic guide for estimating continuous pollutant emission rates of concern in residences (including a database that lists emission test data for commercially-available labeled products).

54

Balance-of-System Equipment Required for Renewable Energy Systems |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Balance-of-System Equipment Required for Renewable Energy Systems Balance-of-System Equipment Required for Renewable Energy Systems Balance-of-System Equipment Required for Renewable Energy Systems July 2, 2012 - 8:21pm Addthis Both grid-connected and off-grid home renewable energy systems require additional “balance-of-system” equipment. Both grid-connected and off-grid home renewable energy systems require additional "balance-of-system" equipment. How does it work? With a stand-alone system, depending on your needs, balance-of-system equipment could account for half of your total system costs. For both stand-alone and grid-connect systems, you will need power conditioning equipment, safety equipment, and meters and instrumentation. For stand-alone systems, you will also want batteries and charge controllers.

55

Earned Value Management System (EVMS) Surveillance Standard Operating Procedure  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System (EVMS) System (EVMS) Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset

56

Defining Requirements for Improved Photovoltaic System Reliability  

DOE Green Energy (OSTI)

Reliable systems are an essential ingredient of any technology progressing toward commercial maturity and large-scale deployment. This paper defines reliability as meeting system fictional requirements, and then develops a framework to understand and quantify photovoltaic system reliability based on initial and ongoing costs and system value. The core elements necessary to achieve reliable PV systems are reviewed. These include appropriate system design, satisfactory component reliability, and proper installation and servicing. Reliability status, key issues, and present needs in system reliability are summarized for four application sectors.

Maish, A.B.

1998-12-21T23:59:59.000Z

57

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

58

Integrated Requirements Management System and System Design Description  

Science Conference Proceedings (OSTI)

This document provides a System Design Description (SDD) for the Integrated Requirements Management System (IRMS) database. The database manager chosen for this task was the Dynamic Object Oriented Requirements System (DOORS) Version 5.0 or greater. The schema for the IRMS is described with respect to the CH2M Hill Hanford Group, Inc requirements management processes.

ACREE, C.D.

2001-03-27T23:59:59.000Z

59

Monitoring system-of-systems requirements in multi product lines  

Science Conference Proceedings (OSTI)

[Context and motivation] Large-scale software-intensive systems are often considered as systems of systems comprising several interrelated product lines from which system variants are derived to meet the overall requirements. [Question/problem] ...

Thomas Klambauer, Gerald Holl, Paul Grünbacher

2013-04-01T23:59:59.000Z

60

A Summary of Control System Security Standards Activities in...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Summary of Control System Security Standards Activities in the Energy Sector (October 2005) A Summary of Control System Security Standards Activities in the Energy Sector...

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Meeting Residential Ventilation Standards Through Dynamic Control of Ventilation Systems  

SciTech Connect

Existing ventilation standards, including American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) Standard 62.2, specify continuous operation of a defined mechanical ventilation system to provide minimum ventilation, with time-based intermittent operation as an option. This requirement ignores several factors and concerns including: other equipment such as household exhaust fans that might incidentally provide ventilation, negative impacts of ventilation when outdoor pollutant levels are high, the importance of minimizing energy use particularly during times of peak electricity demand, and how the energy used to condition air as part of ventilation system operation changes with outdoor conditions. Dynamic control of ventilation systems can provide ventilation equivalent to or better than what is required by standards while minimizing energy costs and can also add value by shifting load during peak times and reducing intake of outdoor air contaminants. This article describes the logic that enables dynamic control of whole-house ventilation systems to meet the intent of ventilation standards and demonstrates the dynamic ventilation system control concept through simulations and field tests of the Residential Integrated Ventilation-Energy Controller (RIVEC).

Sherman, Max H.; Walker, Iain S.

2011-04-01T23:59:59.000Z

62

Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington  

DOE Green Energy (OSTI)

Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.

Smith, I.M.; Sale, M.J.

1993-06-01T23:59:59.000Z

63

standards  

Science Conference Proceedings (OSTI)

... About Circular A-119About Us. Standards. Definition of Standards. Finding Standards. Information on Biometrics Standards.

2012-12-13T23:59:59.000Z

64

Reading Lists in Cambridge: A Standard System?  

E-Print Network (OSTI)

of lists. Some of the main benefits of the adoption of a standard system would be: • Consistent user experience • Ease of access to resources • Ease of list discovery • Streamlining of workflows (functionality, list maintenance, stock management... with pedagogic support. Implementation The key organisations for implementation are: • University Library (UL) • CARET • Management Information Services Division (MISD) A successful implementation will rely on engaging key users, particularly academics...

Jones, Huw

65

Methodology for assessing systems materials requirements  

SciTech Connect

A potential stumbling block to new system planning and design is imprecise, confusing, or contradictory data regarding materials - their availability and costs. A methodology is now available that removes this barrier by minimizing uncertainties regarding materials availability. Using this methodology, a planner can assess materials requirements more quickly, at lower cost, and with much greater confidence in the results. Developed specifically for energy systems, its potential application is much broader. This methodology and examples of its use are discussed.

Culver, D.H.; Teeter, R.R.; Jamieson, W.M.

1980-01-01T23:59:59.000Z

66

Revision of the energy conservation requirements in the manufactured home construction and safety standards  

SciTech Connect

Thermal requirements were developed for manufactured (mobile) homes in response to legislation requiring the US Department of Housing and Urban Development (HUD) to revise its thermal standards for manufactured homes. A life-cycle cost minimization from the home owner`s perspecetive was used to establish an optimum in a large number of cities for several prototype homes. The development of the economic, financial, and energy conservation measure parameters input into the life-cycle cost analysis was documented. The optimization results were aggregated to zones which were expressed as a maximum overall home U-value (thermal transmittance) requirement. The revised standard`s costs, benefits, and net value to the consumer were quantified. 50 refs.

Conner, C.C.; Lee, A.D.; Lucas, R.G.; Taylor, Z.T.

1992-02-01T23:59:59.000Z

67

Control Systems Security Standards: Accomplishments & Impacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

019 019 Unlimited Release November 2007 Control Systems Security Standards Accomplishments & Impacts Ronald Halbgewachs Prepared by Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under Contract DE-AC04-94AL85000. Approved for public release; further dissemination unlimited. 2 Issued by Sandia National Laboratories, operated for the United States Department of Energy by Sandia Corporation. NOTICE: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency

68

Control Center Application Program Interface (CCAPI) Project: API Standard Proposal Requirements for Generic Interface Definition (GID)  

Science Conference Proceedings (OSTI)

The Control Center Application Program Interface (CCAPI) Task Force is charged with producing design criteria for international energy management system (EMS) standards. Their aim is to integrate independently developed EMS applications. The resulting standards will provide utilities with competitive choices in the design of their control systems, while offering less expensive applications to meet the needs of the rapidly changing electric power industry. The initial Task Force deliverable was the Common...

2001-11-29T23:59:59.000Z

69

System Assessment Standards: Defining the Market for Assessment Services  

E-Print Network (OSTI)

Improved system efficiency can contribute to an industrial facility’s bottom line and also improve reliability and better utilize assets. Despite these opportunities, many industrial facilities continue to have unrealized system optimization potential. A significant barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services. This creates problems for service providers in establishing market value for their services and problems for consumers in determining the relative quality of assessment service offerings. Achieving certification for energy efficiency will require industrial facilities to document a specified reduction in energy intensity. Application of System Assessment Standards will offer industrial facilities seeking certification a well-defined path toward improved energy intensity. System Assessment Standards will help define the market for both users and providers of industrial system assessment services. Use of these standards will provide assurance that a particular assessment represents a recognized threshold for accuracy and completeness. The goal is a significant increase in system energy efficiency improvements in U.S. industry.

McKane, A. T.; Sheaffer, P. E.

2008-01-01T23:59:59.000Z

70

Revision of the energy conservation requirements in the manufactured home construction and safety standards  

SciTech Connect

Thermal requirements were developed for manufactured (mobile) homes in response to legislation requiring the US Department of Housing and Urban Development (HUD) to revise its thermal standards for manufactured homes. A life-cycle cost minimization from the home owner's perspecetive was used to establish an optimum in a large number of cities for several prototype homes. The development of the economic, financial, and energy conservation measure parameters input into the life-cycle cost analysis was documented. The optimization results were aggregated to zones which were expressed as a maximum overall home U-value (thermal transmittance) requirement. The revised standard's costs, benefits, and net value to the consumer were quantified. 50 refs.

Conner, C C; Lee, A D; Lucas, R G; Taylor, Z T

1992-02-01T23:59:59.000Z

71

ASHRAE Standard 90.1-2007 -- Lighting and Power Requirements | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Lighting and Power Requirements Lighting and Power Requirements This course provides an overview of the lighting and power requirements of ASHRAE Standard 90.1-2007. Estimated Length: 60 minutes Presenters: Eric Richman, Pacific Northwest National Laboratory Original Webcast Date: Thursday, January 10, 2008 - 13:00 CEUs Offered: 1.0 AIA/CES LU (HSW); .10 CEUs towards ICC renewal certification. Course Type: Video Downloads: Presentation Slides Video Watch on YouTube Visit the BECP Online Training Center for instructions on how to obtain a certificate of completion. Building Type: Commercial Focus: Compliance Code Version: ASHRAE Standard 90.1-2007 Target Audience: Architect/Designer Builder Code Official Contractor Engineer State Official Contacts Web Site Policies U.S. Department of Energy USA.gov

72

System 80+{trademark} Standard Design: CESSAR design certification. Volume 4: Amendment I  

Science Conference Proceedings (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These documents describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design. This report, Volume 4, provides a description of the reactor, reactor internals, fuel assemblies, and associated design requirements.

Not Available

1990-12-21T23:59:59.000Z

73

IEEE Standards Working Group P1622 on Voting Systems ...  

Science Conference Proceedings (OSTI)

IEEE Standards Working Group P1622 on Voting Systems Electronic Data Worked Examples of EML Usage. The OASIS ...

2012-03-06T23:59:59.000Z

74

Software requirements definition Shipping Cask Analysis System (SCANS)  

SciTech Connect

The US Nuclear Regulatory Commission (NRC) staff reviews the technical adequacy of applications for certification of designs of shipping casks for spent nuclear fuel. In order to confirm an acceptable design, the NRC staff may perform independent calculations. The current NRC procedure for confirming cask design analyses is laborious and tedious. Most of the work is currently done by hand or through the use of a remote computer network. The time required to certify a cask can be long. The review process may vary somewhat with the engineer doing the reviewing. Similarly, the documentation on the results of the review can also vary with the reviewer. To increase the efficiency of this certification process, LLNL was requested to design and write an integrated set of user-oriented, interactive computer programs for a personal microcomputer. The system is known as the NRC Shipping Cask Analysis System (SCANS). The computer codes and the software system supporting these codes are being developed and maintained for the NRC by LLNL. The objective of this system is generally to lessen the time and effort needed to review an application. Additionally, an objective of the system is to assure standardized methods and documentation of the confirmatory analyses used in the review of these cask designs. A software system should be designed based on NRC-defined requirements contained in a requirements document. The requirements document is a statement of a project's wants and needs as the users and implementers jointly understand them. The requirements document states the desired end products (i.e. WHAT's) of the project, not HOW the project provides them. This document describes the wants and needs for the SCANS system. 1 fig., 3 tabs.

Johnson, G.L.; Serbin, R.

1985-07-21T23:59:59.000Z

75

CARS Control Anomaly Recognition System: System Concept, Requirements, and Specifications  

Science Conference Proceedings (OSTI)

This report presents results of an initial study aimed at defining the system concept, principal requirements, and functional specification for a control anomaly recognition system (CARS) software tool. The purpose of the CARS software system is to assist nuclear power plant operators in the early detection of faults and anomalies in plant control systems before they cause reactor scrams or component damage. The diagnostic capability technology of CARS can support other process industries' applications b...

2002-04-12T23:59:59.000Z

76

Revision of the Energy-Efficiency Requirements in the Manufactured Home Construction and Safety Standards  

SciTech Connect

Energy-efficiency requirements were developed for manufactured (mobile) homes, which are regulated by the U.S. Department of Housing and Urban Development. A life-cycle cost analysis from the homeowner's perspective was used to establish parameters for a least-cost home in a large number of cities. Economic, financial, and energy-efficiency measures for the life-cycle cost analysis were selected and documented. The resulting energy-efficiency levels were aggregated to zones that were expressed as a maximum overall home U-factor (thermal transmittance) requirement for the building envelope. The proposed revised standard's costs, benefits, and net value to the consumer were quantified. This analysis updates a similar effort completed in 1992, which was the basis for the existing HUD code overall U-factor requirement.

Conner, Craig C.; Dillon, Heather E.; Lucas, Robert G.; Lubliner, Michael

2004-06-01T23:59:59.000Z

77

Comparison of selected DOE and non-DOE requirements, standards, and practices for Low-Level Radioactive Waste Disposal  

SciTech Connect

This document results from the Secretary of Energy`s response to Defense Nuclear Facilities Safety Board Recommendation 94--2. The Secretary stated that the US Department of Energy (DOE) would ``address such issues as...the need for additional requirements, standards, and guidance on low-level radioactive waste management. `` The authors gathered information and compared DOE requirements and standards for the safety aspects Of low-level disposal with similar requirements and standards of non-DOE entities.

Cole, L. [Cole and Associates (United States); Kudera, D.; Newberry, W. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1995-12-01T23:59:59.000Z

78

NGSI: FUNCTION REQUIREMENTS FOR A CYLINDER TRACKING SYSTEM  

SciTech Connect

While nuclear suppliers currently track uranium hexafluoride (UF{sub 6}) cylinders in various ways, for their own purposes, industry practices vary significantly. The NNSA Office of Nonproliferation and International Security's Next Generation Safeguards Initiative (NGSI) has begun a 5-year program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF{sub 6} cylinders. As part of this effort, NGSI's multi-laboratory team has documented the 'life of a UF{sub 6} cylinder' and reviewed IAEA practices related to UF{sub 6} cylinders. Based on this foundation, this paper examines the functional requirements of a system that would uniquely identify and track UF{sub 6} cylinders. There are many considerations for establishing a potential tracking system. Some of these factors include the environmental conditions a cylinder may be expected to be exposed to, where cylinders may be particularly vulnerable to diversion, how such a system may be integrated into the existing flow of commerce, how proprietary data generated in the process may be protected, what a system may require in terms of the existing standard for UF{sub 6} cylinder manufacture or modifications to it and what the limiting technology factors may be. It is desirable that a tracking system should provide benefit to industry while imposing as few additional constraints as possible and still meeting IAEA safeguards objectives. This paper includes recommendations for this system and the analysis that generated them.

Branney, S.

2012-06-06T23:59:59.000Z

79

DOE Technical Standards Program: Search System  

NLE Websites -- All DOE Office Websites (Extended Search)

the Nuclear Safety Technical Standards Collection, using a full-text search engine to query all text components of the documents. The "Search" button will execute a query on the...

80

Circuits of power in creating de jure standards: shaping an international information systems security standard  

Science Conference Proceedings (OSTI)

This paper addresses the role of power and politics in setting standards. It examines the interaction of external contingencies, powerful agents, resources, meaning, and membership of relevant social and institutional groupings in generating successful ... Keywords: information systems security management, information systems security standards, institutionalization, power and politics, security management code of practice

James Backhouse; Carol W. Hsu; Leiser Silva

2006-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Standard-D hydrogen monitoring system, system design description  

DOE Green Energy (OSTI)

During most of the year, it is assumed that the vapor space in the 177 radioactive waste tanks on the Hanford Project site contain a uniform mixture of gases. Several of these waste tanks (currently twenty-five, 6 Double Shell Tanks and 19 Single Shell Tanks) were identified as having the potential for the buildup of gasses to a flammable level. An active ventilation system in the Double Shell Tanks and a passive ventilation system in the Single Shell Tanks provides a method of expelling gasses from the tanks. A gas release from a tank causes a temporary rise in the tank pressure, and a potential for increased concentration of hydrogen gas in the vapor space. The gas is released via the ventilation systems until a uniform gas mixture in the vapor space is once again achieved. The Standard Hydrogen Monitoring System (SHMS) is designed to monitor and quantify the percent hydrogen concentration during these potential gas releases. This document describes the design of the Standard-D Hydrogen Monitoring System, (SHMS-D) and its components as it differs from the original SHMS.

Schneider, T.C.

1996-09-26T23:59:59.000Z

82

High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID)  

SciTech Connect

The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 3) presents the standards and requirements for the following sections: Safeguards and Security, Engineering Design, and Maintenance.

Not Available

1994-04-01T23:59:59.000Z

83

High level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 6  

SciTech Connect

The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 6) outlines the standards and requirements for the sections on: Environmental Restoration and Waste Management, Research and Development and Experimental Activities, and Nuclear Safety.

Not Available

1994-04-01T23:59:59.000Z

84

High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 2  

Science Conference Proceedings (OSTI)

The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction.

Not Available

1994-04-01T23:59:59.000Z

85

High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 4  

SciTech Connect

The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 4) presents the standards and requirements for the following sections: Radiation Protection and Operations.

Not Available

1994-04-01T23:59:59.000Z

86

High-level waste storage tank farms/242-A evaporator Standards/Requirements Identification Document (S/RID), Volume 5  

SciTech Connect

The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Identification Document (S/RID) is contained in multiple volumes. This document (Volume 5) outlines the standards and requirements for the Fire Protection and Packaging and Transportation sections.

1994-04-01T23:59:59.000Z

87

Environment, Safety, and Health Assurance Program Standard: analysis in the context of Department of Energy environment, safety, and health requirements  

SciTech Connect

An Environment, Safety and Health (ES and H) Assurance Program Standard is presented. The Standard was published for comments in a previous document, and has been revised as a result of those comments. The benefits of using the Standard are described and, through the use of comparisons, it is demonstrated that the requirements of the applicable Department of Energy (DOE) Orders are satisfied by a program designed in accordance with the Standard.

Ellingson, A.C.; Trauth, C.A. Jr.

1979-09-01T23:59:59.000Z

88

Process Control System Cyber Security Standards - An Overview  

Science Conference Proceedings (OSTI)

The use of cyber security standards can greatly assist in the protection of critical infrastructure by providing guidelines and requisite imperatives in the implementation of computer-controlled systems. These standards are most effective when the engineers and operators using the standards understand what each of the standards addresses and does not address. This paper provides a review and comparison of ten documents dealing with control system cyber security. It is not meant to be a complete treatment of all applicable standards; rather, this is an exemplary analysis showing the benefits of comparing and contrasting differing documents.

Robert P. Evans; V Stanley Scown; Rolf Carlson; Shabbir Shamsuddin; George Shaw; Jeff Dagle; Paul W Oman; Jeannine Schmidt

2005-10-01T23:59:59.000Z

89

Engineering Task Plan for Standard Hydrogen Monitoring System Operation  

DOE Green Energy (OSTI)

Tanks that are known or suspected to retain and occasionally release flammable gases are equipped with Standard Hydrogen Monitoring System (SHMS) cabinets. These cabinets contain Whittaker{trademark} electrochemical cells and may also have a gas chromatograph (GC) and/or a Bruel and Kjaer infrared photo-acoustic multi-gas monitor (B&K). The GC and B&K will be referred to collectively as ''analytical instruments'' in this document. Using these instruments, a tank can be monitored for hydrogen, helium, ammonia, methane, and nitrous oxide. Air from the tank vent header (for actively ventilated tanks) or dome space (for passively ventilated tanks) is drawn continuously through the monitoring instruments via a sample pump. This monitoring is performed to track the gas release behavior of selected waste storage tanks and to help identify any potentially serious gas release behavior. Vapor grab samples may be obtained from the SHMS as well and analyzed with a mass spectrometer to obtain concentration data about hydrogen and other gases. This document describes the requirements for the operation, maintenance, calibration, and data collection for the Standard Hydrogen Monitoring System. Additionally, this document defines who is responsible for the various tasks.

MCCAIN, D.J.

1999-11-11T23:59:59.000Z

90

Standard-B Hydrogen Monitoring System, system design description  

DOE Green Energy (OSTI)

During most of the year, it is assumed that the vapor in the 177 radioactive waste tanks on the Hanford Project site contain a uniform mixture of gases. Several of these waste tanks (currently twenty five, 6 Double Shell Tanks and 19 Single Shell Tanks) were identified as having the potential for the buildup of gases to a flammable level. An active ventilation system in the Double Shell Tanks and a passive ventilation system in the Single Shell Tanks provides a method of expelling gases from the tanks. A gas release from a tank causes a temporary rise in the tank pressure, and a potential for increased concentration of hydrogen gas in the vapor space. The gas is released via the ventilation systems until a uniform gas mixture in the vapor space is once again achieved. This document describes the design of the Standard-B Hydrogen Monitoring System, (SHMS) and its components as it differs from the original SHMS. The differences are derived from changes made to improve the system performance but not implemented in all the installed enclosures.

Schneider, T.C.

1995-01-16T23:59:59.000Z

91

DOE-STD-6002-96; DOE Standard Safety of Magnetic Fusion Facilities: Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6002-96 6002-96 May 1996 DOE STANDARD SAFETY OF MAGNETIC FUSION FACILITIES: REQUIREMENTS U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE96009495 DOE-STD-6002-96 iii TABLE OF CONTENTS Page FOREWORD....................................................................................................................... v

92

NREL PV System Performance and Standards Technical Progress  

DOE Green Energy (OSTI)

This paper presents a brief overview of the status and accomplishments during Fiscal Year (FY)2004 of the Photovoltaic (PV) System Performance & Standards Subtask, which is part of PV Systems Engineering Project (a joint NREL-Sandia project).

Osterwald, C. R.

2005-01-01T23:59:59.000Z

93

Reviewing Consensus HFE Standards for NRC Use: A Case Study using the IEEE Standard for Computerized Operating Procedure Systems  

SciTech Connect

The U.S. Nuclear Regulatory Commission’s (NRC’s) endorsement of consensus standards provides a cost-effective means of enhancing the staff’s ability to review state-of-the-art designs. Although the NRC endorsed consensus standards in many technical disciplines, it yet has to do so in human factors engineering (HFE). The purpose of our study was to develop a standardized methodology whereby to evaluate a consensus HFE standard to determine its appropriateness to, and adequacy for using in licensing reviews. The high-level objective of the methodology is to ensure that the guidance meets the NRC’s requirements on scientific- and engineering-rigor that they use in developing their own guidance. We propose four criteria for endorsing a consensus standard: (1) It should meet an existing need for NRC’s licensing and safety reviews; (2) it should be based on sound HFE principles; (3) it should be thoroughly peer-reviewed; and, (4) it should address human performance issues identified in the literature. Our methodology offers a means to assess these four criteria. We used it to evaluate an Institute of Electrical and Electronics Engineers’ (IEEE) draft standard on computerized operating procedure systems. We concluded that the IEEE standard generally met the established criteria, although several areas were identified that needed further clarification. Our evaluation methodology particularly was useful for identifying issues to be resolved, and for providing a basis for judging whether the staff should consider endorsing the standard. The methodology also helped recognize criteria in the proposed standard that may benefit from additional scrutiny by the staff. The evaluation methodology developed is applicable generally to reviewing other HFE standards that the NRC is considering for use or endorsement.

OHara, J.M.; Higgins, J.; Xing, J., Fleger S. - NRC

2010-11-07T23:59:59.000Z

94

Standard Data Exchanges for Distribution System Management  

SciTech Connect

Databases and software tools for electric power distribution systems have not been integrated, and this leads to extra costs and restrictions imposed on utilities and other stakeholders. For example, distributed resource integration studies and modern grid technology assessments are more difficult and costly. New vendors face high market entry barriers, because it’s necessary to interface with large and customized data systems at each potential utility customer. This project promotes data and software tool integration, through a set of data translators based on a common object model. The data translators are delivered as open-source software, using appropriate Web software technologies. The parties who benefit include electric utilities (and their ratepayers), researchers at government laboratories and universities, small software companies wishing to enter the electric utility market, and parties wishing to interconnect distributed generation to a utility system.

Thomas E. McDermott

2007-10-05T23:59:59.000Z

95

Standardization of a Hierarchical Transactive Control System  

SciTech Connect

The authors describe work they have conducted toward the generalization and standardization of the transactive control approach that was first demonstrated in the Olympic Peninsula Project for the management of a transmission constraint. The newly generalized approach addresses several potential shortfalls of the prior approach: First, the authors have formalized a hierarchical node structure which defines the nodes and the functional signal pathways between these nodes. Second, by fully generalizing the inputs, outputs, and functional responsibilities of each node, the authors make the approach available to a much wider set of responsive assets and operational objectives. Third, the new, generalized approach defines transactive signals that include the predicted day-ahead future. This predictive feature allows the market-like bids and offers to become resolved iteratively over time, thus allowing the behaviors of responsive assets to be called upon both for the present and as future dispatch decisions are being made. The hierarchical transactive control approach is a key feature of a proposed Pacific Northwest smart grid demonstration.

Hammerstrom, Donald J.; Oliver, Terry V.; Melton, Ronald B.; Ambrosio, Ron

2010-12-03T23:59:59.000Z

96

Standard for Communicating Waste Characterization and DOT Hazard Classification Requirements for Low Specific Activity Materials and Surface Contaminated Objects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STD-5507-2013 STD-5507-2013 February 2013 DOE STANDARD Standard for Communicating Waste Characterization and DOT Hazard Classification Requirements for Low Specific Activity Materials and Surface Contaminated Objects [This Standard describes acceptable, but not mandatory means for complying with requirements. Standards are not requirements documents and are not to be construed as requirements in any audit or appraisal for compliance with associated rule or directives.] U.S. Department of Energy SAFT Washington, D.C. 20585 Distribution Statement: A. Approved for public release; distribution is unlimited This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services,

97

Microsoft Word - AMI System Security Requirements - v1_01-1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UCAIUG: AMI-SEC-ASAP UCAIUG: AMI-SEC-ASAP AMI System Security Requirements V1.01 ASAP 12/17/2008 AMI System Security Specification v1.0 Page i Executive Summary 1 This document provides the utility industry and vendors with a set of security requirements for 2 Advanced Metering Infrastructure (AMI). These requirements are intended to be used in the 3 procurement process, and represent a superset of requirements gathered from current cross- 4 industry accepted security standards and best practice guidance documents. 5 6 This document provides substantial supporting information for the use of these requirements 7 including scope, context, constraints, objectives, user characteristics, assumptions, and 8

98

Framework for Grading Procurement Requirements for Power Delivery Systems  

Science Conference Proceedings (OSTI)

Determining how to apply cyber security requirements for new power delivery systems requires cyber security experts, power system engineers, and procurement organizations to work together with vendors to select, implement, and maintain cyber security controls. Improper or incomplete implementations of security controls due to a lack of adequate requirements and/or division of responsibilities between the utility and vendor can often result in costly back fit to meet requirements.This ...

2013-11-27T23:59:59.000Z

99

ELECTRICAL SYSTEMS AND SAFETY OVERSIGHT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Electrical Systems and Safety Oversight Qualification Standard Reference Guide DECEMBER 2009 This page is intentionally blank. Table of Contents i. i LIST OF FIGURES ..................................................................................................................... vi LIST OF TABLES ..................................................................................................................... viii ACRONYMS ................................................................................................................................ ix PURPOSE ...................................................................................................................................... 1 SCOPE ........................................................................................................................................... 1

100

Standard-C hydrogen monitoring system. Acceptance test report  

DOE Green Energy (OSTI)

Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on Flammable Gas Watch List waste tank 104-AN. This document is the acceptance test report for the acceptance testing of the SHMS.

Lott, D.T.

1995-05-17T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Interaction of EMS related systems by using the CIM standard  

E-Print Network (OSTI)

Interaction of EMS related systems by using the CIM standard Mathias Uslar, Tanja Schmedes1 OFFIS Model (CIM) establishes a common language and domain model for energy management systems and related to connect the systems to a an integration platform using the CIM as a common language. This paper

Appelrath, Hans-Jürgen

102

Transportation system requirements document. Revision 1 DCN01. Supplement  

SciTech Connect

The original Transportation System Requirements Document described the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of that document was to define the system-level requirements. These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presented an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. This revision of the document contains only the pages that have been modified.

1995-05-01T23:59:59.000Z

103

A taxonomy for identifying requirement interactions in software systems  

Science Conference Proceedings (OSTI)

This paper presents an interaction taxonomy for classifying and identifying requirement interactions in software systems. The proposed taxonomy is in the form of a four-layered pyramid that defines 6 Main Interaction Categories in the first layer, 17 ... Keywords: Interaction scenarios, Requirement engineering, Requirement interaction taxonomy

Mohamed Shehata; Armin Eberlein; Abraham O. Fapojuwo

2007-02-01T23:59:59.000Z

104

Information systems research behaviors: what are the normative standards?  

Science Conference Proceedings (OSTI)

Information systems researchers frequently face quandaries in their professional lives. We present the results of a study of academic IS researchers that assesses their judgments and the prevalence of 29 questionable research-related behaviors. We find ... Keywords: code of research conduct, information systems research, normative standards, survey

Gove N. Allen; Nicholas L. Ball; H. Jeff Smith

2011-09-01T23:59:59.000Z

105

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

Science Conference Proceedings (OSTI)

This report is a scoping study that identifies issues associated with developing a national evaluation, measurement and verification (EM&V) standard for end-use, non-transportation, energy efficiency activities. The objectives of this study are to identify the scope of such a standard and define EM&V requirements and issues that will need to be addressed in a standard. To explore these issues, we provide and discuss: (1) a set of definitions applicable to an EM&V standard; (2) a literature review of existing guidelines, standards, and 'initiatives' relating to EM&V standards as well as a review of 'bottom-up' versus 'top-down' evaluation approaches; (3) a summary of EM&V related provisions of two recent federal legislative proposals (Congressman Waxman's and Markey's American Clean Energy and Security Act of 2009 and Senator Bingaman's American Clean Energy Leadership Act of 2009) that include national efficiency resource requirements; (4) an annotated list of issues that that are likely to be central to, and need to be considered when, developing a national EM&V standard; and (5) a discussion of the implications of such issues. There are three primary reasons for developing a national efficiency EM&V standard. First, some policy makers, regulators and practitioners believe that a national standard would streamline EM&V implementation, reduce costs and complexity, and improve comparability of results across jurisdictions; although there are benefits associated with each jurisdiction setting its own EM&V requirements based on their specific portfolio and evaluation budgets and objectives. Secondly, if energy efficiency is determined by the US Environmental Protection Agency to be a Best Available Control Technology (BACT) for avoiding criteria pollutant and/or greenhouse gas emissions, then a standard can be required for documenting the emission reductions resulting from efficiency actions. The third reason for a national EM&V standard is that such a standard is likely to be required as a result of future federal energy legislation that includes end-use energy efficiency, either as a stand-alone energy-efficiency resource standard (EERS) or as part of a clean energy or renewable energy standard. This study is focused primarily on this third reason and thus explores issues associated with a national EM&V standard if energy efficiency is a qualifying resource in federal clean energy legislation. Developing a national EM&V standard is likely to be a lengthy process; this study focuses on the critical first step of identifying the issues that must be addressed in a future standard. Perhaps the most fundamental of these issues is 'how good is good enough?' This has always been the fundamental issue of EM&V for energy efficiency and is a result of the counter-factual nature of efficiency. Counter-factual in that savings are not measured, but estimated to varying degrees of accuracy by comparing energy consumption after a project (program) is implemented with what is assumed to have been the consumption of energy in the absence of the project (program). Therefore, the how good is good enough question is a short version of asking how certain does one have to be of the energy savings estimate that results from EM&V activities and is that level of certainty properly balanced against the amount of effort (resources, time, money) that is utilized to obtain that level of certainty. The implication is that not only should energy efficiency investments be cost-effective, but EM&V investments should consider risk management principles and thus also balance the costs and value of information derived from EM&V (EM&V should also be cost-effective).

Schiller Consulting, Inc.; Schiller, Steven R.; Goldman, Charles A.; Galawish, Elsia

2011-02-04T23:59:59.000Z

106

Emergency Diesel Generator Digital Control System Upgrade Requirements  

Science Conference Proceedings (OSTI)

This interim report documents the development of system requirements for a digital control system upgrade to the station emergency diesel generators (EDGs). Operators of nuclear power plants (NPPs) must be able to replace and upgrade equipment in a cost-effective manner while continuing to meet safety and reliability requirements and controlling modification costs. Upgrades to plant equipment—especially instrumentation and control (I&C) systems—typically involve replacement of analog ...

2013-12-18T23:59:59.000Z

107

Definition of requirements for geothermal power conversion system studies  

DOE Green Energy (OSTI)

Candidate power conversion systems and criteria for comparing these systems are listed. The elements of each conceptual design and standard approaches to equipment design are described. The methods used to calculate heat and mass balances and the data used in the calculations are described. The method used in developing the economics of each system is described and factors such as construction wage rates common to all systems are included. Standard methods for developing the conceptual designs and corresponding economics are defined so that the results of each system study can be readily compared to those of the others. The candidate conversion systems are: multistage flash/binary; two stage flash with scrubbing; total flow; multistage flash/direct contact (Bechtel patented process); four stage flash/binary; binary with direct contact heat exchangers; hybrid-flash/binary; hybrid-flash/total flow; and flash/dual cycle binary. (MHR)

Not Available

1977-06-30T23:59:59.000Z

108

Development of a Consensus Standard for Verification and Validation of Nuclear System Thermal-Fluids Software  

SciTech Connect

With the resurgence of nuclear power and increased interest in advanced nuclear reactors as an option to supply abundant energy without the associated greenhouse gas emissions of the more conventional fossil fuel energy sources, there is a need to establish internationally recognized standards for the verification and validation (V&V) of software used to calculate the thermal-hydraulic behavior of advanced reactor designs for both normal operation and hypothetical accident conditions. To address this need, ASME (American Society of Mechanical Engineers) Standards and Certification has established the V&V 30 Committee, under the jurisdiction of the V&V Standards Committee, to develop a consensus standard for verification and validation of software used for design and analysis of advanced reactor systems. The initial focus of this committee will be on the V&V of system analysis and computational fluid dynamics (CFD) software for nuclear applications. To limit the scope of the effort, the committee will further limit its focus to software to be used in the licensing of High-Temperature Gas-Cooled Reactors. In this framework, the Standard should conform to Nuclear Regulatory Commission (NRC) and other regulatory practices, procedures and methods for licensing of nuclear power plants as embodied in the United States (U.S.) Code of Federal Regulations and other pertinent documents such as Regulatory Guide 1.203, 'Transient and Accident Analysis Methods' and NUREG-0800, 'NRC Standard Review Plan'. In addition, the Standard should be consistent with applicable sections of ASME NQA-1-2008 'Quality Assurance Requirements for Nuclear Facility Applications (QA)'. This paper describes the general requirements for the proposed V&V 30 Standard, which includes; (a) applicable NRC and other regulatory requirements for defining the operational and accident domain of a nuclear system that must be considered if the system is to be licensed, (b) the corresponding calculation domain of the software that should encompass the nuclear operational and accident domain to be used to study the system behavior for licensing purposes, (c) the definition of the scaled experimental data set required to provide the basis for validating the software, (d) the ensemble of experimental data sets required to populate the validation matrix for the software in question, and (e) the practices and procedures to be used when applying a validation standard. Although this initial effort will focus on software for licensing of High-Temperature Gas-Cooled Reactors, it is anticipated that the practices and procedures developed for this Standard can eventually be extended to other nuclear and non-nuclear applications.

Edwin A. Harvego; Richard R. Schultz; Ryan L. Crane

2011-12-01T23:59:59.000Z

109

Mechanical Systems Qualification Standard DOE-STD-1161-2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mechanical Systems Mechanical Systems Qualification Standard DOE-STD-1161-2008 August 2012 Reference Guide The Functional Area Qualification Standard References Guides are developed to assist operators, maintenance personnel, and the technical staff in the acquisition of technical competence and qualification within the Technical Qualification Program (TQP). Please direct your questions or comments related to this document to Patrick C. Romero, Deputy TQP Manager, Office of Leadership and Career Management, NNSA Albuquerque Complex, 505.845.6371. This page is intentionally blank. ii Table of Contents FIGURES ....................................................................................................................................... v TABLES ....................................................................................................................................... vii

110

Review of the IEEE Standard for Computerized Operating Procedure Systems  

SciTech Connect

Increasingly nuclear power plant procedures, such as emergency operating procedures, are being presented in computer form with functionality to support operator use and management of the procedures. The U.S. Nuclear Regulatory Commission (NRC) currently has guidance for the review of computer-based procedures (CBPs); however, there remain CBP functions and human performance issues for which up-to-date guidance is lacking. The Institute of Electrical and Electronics Engineers (IEEE) has initiated a standard development effort to address the human factors engineering (HFE) aspects of CBP systems. When completed, it may provide guidance to supplement the NRC staff's review criteria. The purpose of our study was to evaluate the suitability of the IEEE Standard for use in the NRC's HFE safety reviews of CBP systems and to ensure that the guidance meets the NRC's standard for scientific and engineering rigor used in its own guidance development efforts. We established the following criteria with which to evaluate the Standard: (1) it should meet an existing need of NRC reviewers, (2) it should be based in sound HFE principles, (3) it should be thoroughly peer-reviewed, and (4) it should address CBP-related human performance issues identified in the literature. This report describes the methodology we used to evaluate each criterion. Our evaluation concluded that the Standard generally does meet these criteria, however several areas were identified for which additional clarifications are needed. Thus consideration of the Standard's use by the NRC is supported. The standard evaluation methodology developed in this study can be generally applied to the review of other HFE standards being considered for possible use or endorsement by the NRC.

O'Hara, J.; Higgins, J.

2010-02-26T23:59:59.000Z

111

Tank waste remediation system functions and requirements document  

Science Conference Proceedings (OSTI)

This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.

Carpenter, K.E

1996-10-03T23:59:59.000Z

112

Codes and Standards Requirements for Deployment of Emerging Fuel Cell Technologies  

DOE Green Energy (OSTI)

The objective of this NREL report is to provide information on codes and standards (of two emerging hydrogen power fuel cell technology markets; forklift trucks and backup power units), that would ease the implementation of emerging fuel cell technologies. This information should help project developers, project engineers, code officials and other interested parties in developing and reviewing permit applications for regulatory compliance.

Burgess, R.; Buttner, W.; Riykin, C.

2011-12-01T23:59:59.000Z

113

Fusion reactor requirements and systems for energy storage and transfer  

DOE Green Energy (OSTI)

Energy storage and transfer requirements for many of the present day reactor systems are listed. Two ohmic heating (OH) requirements, those for toroidal Z-pinches and Tokamaks, are described in more detail. Technologies envisioned for the power conditioning circuitry are discussed.

Thomassen, K.I.; Hagenson, R.L.; Thullin, P.

1978-05-08T23:59:59.000Z

114

Standard-D hydrogen monitoring system acceptance test  

DOE Green Energy (OSTI)

This document details the results of the field Acceptance Testing of the Standard-D Hydrogen Monitoring System on the waste tank exhaust stacks in 241-AW and 241-AN tank farm. The monitors will be used to measure hydrogen and ammonia from the exhaust stacks.

Lott, D.T., Westinghouse Hanford

1996-05-24T23:59:59.000Z

115

Standard  

NLE Websites -- All DOE Office Websites (Extended Search)

Standard Standard rock For at least two generations, the depth of underground muon experiments has been reduced to depth in "standard rock." This is by definition the overburden of the Cayuga Rock Salt Mine near Ithaca, New York, where K. Greisen and collaborators made seminal observations of muons at substantial depths[1]. Ref. 1 says only "Most of the ground consists of shales of various types, with average density 2.65 g/cm 2 and average atomic number 11." Menon and Murthy later extended the definition: Z 2 /A = 5.5, Z/A = 0.5, and and ρ = 2.65 g/cm 2 [2]. It was thus not-quite-sodium. Lohmann[3] further assumed the mean excitation energy and density effect parameters were those of calcium carbonate, with no adjustments for the slight density difference. We use their definition for this most important material. (Extracted from D.E. Groom, N.V. Mokhov, and S.I. Striganov,

116

Information Collection Request (ICR) Data Analysis to Meet Mercury and Air Toxics Standards (MATS) Requirements  

Science Conference Proceedings (OSTI)

With the promulgation of the new Mercury and Air Toxics Standards (MATS), power companies are looking for ways to comply with more stringent limits on emissions. This report summarizes the results of a study to identify trends among the operating parameters of various air pollutant control technologies that could explain differences in the levels of emissions for fine particulate matter, mercury, hydrochloric acid, and total metals reported to the ...

2012-12-20T23:59:59.000Z

117

Technical and System Requirements for Advanced Distribution Automation  

Science Conference Proceedings (OSTI)

Traditional distribution systems were designed to perform one function: distribute electrical energy to end-users. Advanced Distribution Automation (ADA) is a concept for a fully controllable and flexible distribution system that will facilitate the exchange of both electrical energy and information between participants and system components. This report presents background information on distribution automation technologies and develops a roadmap to achieve the ADA systems required for future power deli...

2004-06-09T23:59:59.000Z

118

Standards  

E-Print Network (OSTI)

? Card applications need corresponding applications on card accepting devices ? Goal: ? Support new smart card application deployments by facilitating the development and distribution of corresponding on-device applications ? Requirement: ? Common Software Platform (API and framework) allowing interoperability of device applications with various devices ? Mission: ? As such a software platform did not exist, specify it (with collaboration from other industry initiatives and consortia such as the STIP Consortium) 4

Gp Card; Smart Card Acceptance; Devices Scads

2004-01-01T23:59:59.000Z

119

Safety Basis Requirements for Nonnuclear Facilities at Lawrence Livermore National Laboratory Site-Specific Work Smart Standard Revision 3 December 2006  

SciTech Connect

This standard establishes requirements that, when coupled with Lawrence Livermore National Laboratory's (LLNL's) Integrated Safety Management System (ISMS) methods and other Work Smart Standards for assuring worker safety, assure that the impacts of nonnuclear operations authorized in LLNL facilities are well understood and controlled in a manner that protects the health of workers, the public, and the environment. All LLNL facilities shall be classified based on potential for adverse impact of operations to the health of co-located (i.e., nearby) workers and the public in accordance with this standard, Title 10 Code of Federal Regulations (10 CFR) 830, Subpart B, and Department of Energy Order (DOE O) 420.2A.

Beach, D; Brereton, S; Failor, R; Hildum, J; Ingram, C; Spagnolo, S; van Warmerdam, C

2007-06-07T23:59:59.000Z

120

DOE-STD-3024-98; DOE Standard Content of System Design Descriptions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-98 4-98 October 1998 DOE STANDARD CONTENT OF SYSTEM DESIGN DESCRIPTIONS U.S. Department of Energy AREA EDCO Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3024-98 Page iii FOREWORD This Department of Energy (DOE) standard is approved for use by all Departmental organizational units and contractors of the Department. A System Design Description (SDD) describes the requirements and features of a system. This standard

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Operator Certification Standards for Fossil Fuel Fired Plants: Survey of State and Regional Requirements  

Science Conference Proceedings (OSTI)

The Environmental Protection Agency has only started addressing the issue of certification for fossil fuel power plant operators within the last two years. This report, which includes data collected from research of state and local authorities that currently require power plant operators to be certified or licensed, is the first phase of a certification program for Fossil Fuel Fired Power Plants. The report also addresses the possible future shortage of skilled workers needed by the power plants and the ...

1999-12-16T23:59:59.000Z

122

Functional requirements for gas characterization system computer software  

DOE Green Energy (OSTI)

This document provides the Functional Requirements for the Computer Software operating the Gas Characterization System (GCS), which monitors the combustible gasses in the vapor space of selected tanks. Necessary computer functions are defined to support design, testing, operation, and change control. The GCS requires several individual computers to address the control and data acquisition functions of instruments and sensors. These computers are networked for communication, and must multi-task to accommodate operation in parallel.

Tate, D.D.

1996-01-01T23:59:59.000Z

123

Prediction of Power System Balancing Requirement and Tail Event  

Science Conference Proceedings (OSTI)

This paper presents a methodology for the prediction of power system balancing requirement and the probability of tail event (large imbalance between generation and load). Maintaining sufficient balancing reserves to match the difference between hourly generation schedule and real-time variable load and intermittent resources, becomes more and more challenging with the increasing penetration of intermittent energy sources. The presented methodology uses a yearly distribution and an hourly distribution of balancing requirement and tail events to provide a high level look at the issue and warn system operators of those hours when problems are most likely to occur. For real-time prediction, a Bayes Net model is constructed to model the statistical relationships between system imbalance and forecast errors, generation schedule control errors and other influential factors. The methodology will be able to provide reference information to system operators in determining the sufficiency of system balancing reserve and taking appropriate control actions.

Lu, Shuai; Makarov, Yuri V.; Brothers, Alan J.; McKinstry, Craig A.; Jin, Shuangshuang; Pease, John

2010-04-30T23:59:59.000Z

124

Requirements for Defining Utility Drive Cycles: An Exploratory Analysis of Grid Frequency Regulation Data for Establishing Battery Performance Testing Standards  

DOE Green Energy (OSTI)

Battery testing procedures are important for understanding battery performance, including degradation over the life of the battery. Standards are important to provide clear rules and uniformity to an industry. The work described in this report addresses the need for standard battery testing procedures that reflect real-world applications of energy storage systems to provide regulation services to grid operators. This work was motivated by the need to develop Vehicle-to-Grid (V2G) testing procedures, or V2G drive cycles. Likewise, the stationary energy storage community is equally interested in standardized testing protocols that reflect real-world grid applications for providing regulation services. As the first of several steps toward standardizing battery testing cycles, this work focused on a statistical analysis of frequency regulation signals from the Pennsylvania-New Jersey-Maryland Interconnect with the goal to identify patterns in the regulation signal that would be representative of the entire signal as a typical regulation data set. Results from an extensive time-series analysis are discussed, and the results are explained from both the statistical and the battery-testing perspectives. The results then are interpreted in the context of defining a small set of V2G drive cycles for standardization, offering some recommendations for the next steps toward standardizing testing protocols.

Hafen, Ryan P.; Vishwanathan, Vilanyur V.; Subbarao, Krishnappa; Kintner-Meyer, Michael CW

2011-10-19T23:59:59.000Z

125

Standard hydrogen monitoring system-B operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standards Hydrogen Monitoring System-B (SHMS-B) used in the 200E and 200W area tank farms on the Hanford site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. The primary function of the SHMS-B is to monitor specifically for hydrogen in the waste tank vapor space which may also contain unknown quantities of other gaseous constituents.

Bender, R.M.

1995-01-25T23:59:59.000Z

126

Standard Hydrogen Monitoring System-D operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System-D (SHMS-D) used in the 200E and 200W area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course No. 351405, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

Schneider, T.C.

1997-05-01T23:59:59.000Z

127

Standard hydrogen monitoring system - E operation and maintenance manual  

DOE Green Energy (OSTI)

The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

Schneider, T.C.

1997-06-01T23:59:59.000Z

128

Evaluating Future Standards and Codes with a Focus on High Penetration Photovoltaic (HPPV) System Deployment (Poster)  

DOE Green Energy (OSTI)

Poster displaying solutions for evaluating future standards and codes for high penetration photovoltaic (HPPV) systems.

Coddington, M.; Kroposki, B.; Basso, T.; Lynn, K.

2010-12-01T23:59:59.000Z

129

Integrated Requirements Management System Operations and Maintenance Plan  

Science Conference Proceedings (OSTI)

This document provides a plan for the operations and maintenance of the Integrated Requirements Management Systems (IRMS) database. This document describes the roles and responsibilities for the users of the IRMS. Planning is provided for the configuration management of the DOORS software, hardware and data set. Training consideration for the various categories of users is provided.

ACREE, C.D.

2001-03-26T23:59:59.000Z

130

Electrical Systems And Safety Oversight Functional Area Qualification Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-2007 0-2007 August 2007 DOE STANDARD ELECTRICAL SYSTEMS AND SAFETY OVERSIGHT FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1170-2007 ii This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161, (703) 605-6000 or (800) 553-6847.

131

PV Standards Work: Photovoltaic System and Component Certification, Test Facility Accreditation, and Solar Photovoltaic Energy Systems International Standards  

DOE Green Energy (OSTI)

This paper discusses efforts led by two companies (PowerMark Corporation and Sunset Technologies Inc.) to support both U.S. domestic and international photovoltaic (PV) system and component certification and test facility accreditation programs and the operation of the International Electrotechnical Commission (IEC) Technical Committee 82 (TC-82) Photovoltaic Energy Systems. International and national PV certification/accreditation programs are successfully facilitating entry of only the highest quality PV products into the marketplace. Standards also continue to be a cornerstone for assuring global PV product conformity assessment, reducing non-tariff trade barriers, and ultimately improving PV products while lowering cost.

Basso, T. S.; Chalmers, S.; Barikmo, H. O.

2005-11-01T23:59:59.000Z

132

DOE-STD-1082-94; DOE Standard Preparation, Review, and Approval of Implementaiton Plans For Nuclear Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82-94 82-94 October 1994 DOE STANDARD PREPARATION, REVIEW, AND APPROVAL OF IMPLEMENTATION PLANS FOR NUCLEAR SAFETY REQUIREMENTS U.S. Department of Energy AREA SAFT Washington D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615)576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE95001461 DOE-STD-1082-94 iii FOREWORD 1. This Department of Energy (DOE) technical standard has been prepared by the Office of Environment, Safety and Health with the assistance of Steve

133

Standard-C hydrogen monitoring system acceptance test procedure  

DOE Green Energy (OSTI)

The primary function of the standard-C hydrogen monitoring system (SHMS) is to monitor specifically for hydrogen in the waste tank atmosphere which may also contain (but not be limited to) unknown quantities of air, nitrous oxide, ammonia, water vapor, carbon dioxide, carbon monoxide, and other gaseous constituents. The SHMS will consist of hydrogen specific monitors, a grab sampler to collect samples for laboratory analysis, a gas chromatograph, and the gas sample collection system necessary to support the operation of the instrumentation. This system will be located in a cabinet placed at the tank of interest. The purpose of this document is to demonstrate that the SHMS is constructed as intended by design.

Schneider, T.C.

1994-09-02T23:59:59.000Z

134

Utility market and requirements for a solar thermophotovoltaic system  

Science Conference Proceedings (OSTI)

There is a growing need for clean affordable electric power generation in both the U.S. and internationally and solar thermophotovoltaic (STPV) can meet the needs of this market. This paper investigates the utility grid market applicable to a solar thermophotovoltaic power generating system. It finds that a large international electrical market and a smaller U.S. electrical market exist today but the U.S. market will grow by the year 2005 to a level that would easily support the high production level required for solar systems to be cost effective. Factors which could influence this market and the system characteristics considered by utilities in selecting future power systems such as levelized energy cost, dispatchability, environmental, etc., for both the grid and remote market are discussed. The main competition for this market and the operating performance of this competition are described. A conceptual design of a STPV power system is presented, the operation is described, and how the performance meets the utility requirements is discussed. The relationship between the cost of the TPV conversion unit and the system efficiency of the STPV system is given for both the grid and remote markets that it must meet in order to be competitive. {copyright} {ital 1996 American Institute of Physics.}

Stone, K. [McDonnell Douglas Aerospace, 5301 Bolsa Avenue, Huntington Beach, California 92647 (United States); McLellan, S. [Arizona Public Service, P.O. Box 53999 Phoenix, Arizona (United States)

1996-02-01T23:59:59.000Z

135

System 80+{trademark} standard design: CESSAR design certification. Volume 15: Amendment I  

Science Conference Proceedings (OSTI)

This report has been prepared in support of the industry effort to standardize nuclear plant designs. These documents describe the Combustion Engineering, Inc. System 80+{trademark} Standard Design.

Not Available

1990-12-21T23:59:59.000Z

136

Standards applicable to performance measurement of solar heating and cooling systems  

DOE Green Energy (OSTI)

The advantage of the utilization of existing standards in the performance monitoring of solar heating and cooling systems is discussed. Existing applicable measurement standards and practices are listed.

Lior, N.

1978-01-01T23:59:59.000Z

137

Information technology - Security techniques - Information security management systems - Requirements  

E-Print Network (OSTI)

ISO/IEC 27001:2005 covers all types of organizations (e.g. commercial enterprises, government agencies, not-for profit organizations). ISO/IEC 27001:2005 specifies the requirements for establishing, implementing, operating, monitoring, reviewing, maintaining and improving a documented Information Security Management System within the context of the organization's overall business risks. It specifies requirements for the implementation of security controls customized to the needs of individual organizations or parts thereof. ISO/IEC 27001:2005 is designed to ensure the selection of adequate and proportionate security controls that protect information assets and give confidence to interested parties. ISO/IEC 27001:2005 is intended to be suitable for several different types of use, including the following: use within organizations to formulate security requirements and objectives; use within organizations as a way to ensure that security risks are cost effectively managed; use within organizations to ensure comp...

International Organization for Standardization. Geneva

2005-01-01T23:59:59.000Z

138

A standardized approach to PV system performance model validation.  

DOE Green Energy (OSTI)

PV performance models are used to predict how much energy a PV system will produce at a given location and subject to prescribed weather conditions. These models are commonly used by project developers to choose between module technologies and array designs (e.g., fixed tilt vs. tracking) for a given site or to choose between different geographic locations, and are used by the financial community to establish project viability. Available models can differ significantly in their underlying mathematical formulations and assumptions and in the options available to the analyst for setting up a simulation. Some models lack complete documentation and transparency, which can result in confusion on how to properly set up, run, and document a simulation. Furthermore, the quality and associated uncertainty of the available data upon which these models rely (e.g., irradiance, module parameters, etc.) is often quite variable and frequently undefined. For these reasons, many project developers and other industry users of these simulation tools have expressed concerns related to the confidence they place in PV performance model results. To address this problem, we propose a standardized method for the validation of PV system-level performance models and a set of guidelines for setting up these models and reporting results. This paper describes the basic elements for a standardized model validation process adapted especially for PV performance models, suggests a framework to implement the process, and presents an example of its application to a number of available PV performance models.

Stein, Joshua S.; Jester, Terry (Hudson Clean Energy Partners); Posbic, Jean (BP Solar); Kimber, Adrianne (First Solar); Cameron, Christopher P.; Bourne, Benjamin (SunPower Corporation)

2010-10-01T23:59:59.000Z

139

Power system requirements and selection for the space exploration initiative  

Science Conference Proceedings (OSTI)

The Space Exploration Initiative (SEI) seeks to reestablish a US program of manned and unmanned space exploration. The President has called for a program which includes a space station element, a manned habitation of the moon, and a human exploration of Mars. The NASA Synthesis Group has developed four significantly different architectures for the SEI program. One key element of a space exploration effort is the power required to support the missions. The Power Speciality Team of the Synthesis Group was tasked with assessing and evaluating the power requirements and candidate power technologies for such missions. Inputs to the effort came from existing NASA studies as well as other governments agency inputs such as those from DOD and DOE. In addition, there were industry and university briefings and results of solicitations from the AIAA and the general public as part of the NASA outreach effort. Because of the variety of power needs in the SEI program, there will be a need for multiple power system technologies including solar, nuclear and electrochemical. Due to the high rocket masses required to propel payloads to the moon and beyond to Mars, there is great emphasis placed on the need for high power density and high energy density systems. Power system technology development work is needed results will determine the ultimate technology selections. 23 refs., 10 figs.

Biringer, K.L. (Sandia National Labs., Albuquerque, NM (United States)); Bartine, D.E. (Oak Ridge National Lab., TN (United States)); Buden, D. (Idaho National Engineering Lab., Idaho Falls, ID (United States)); Foreman, J. (Naval Research Lab., Washington, DC (United States)); Harrison, S. (Strategic Defense Initiative Organization, Washington, DC (United States))

1991-01-01T23:59:59.000Z

140

Load Response Fundamentally Matches Power System Reliability Requirements  

Science Conference Proceedings (OSTI)

Responsive load is the most underutilized reliability resource available to the power system. Loads are frequently barred from providing the highest value and most critical reliability services; regulation and spinning reserve. Advances in communications and control technology now make it possible for some loads to provide both of these services. The limited storage incorporated in some loads better matches their response capabilities to the fast reliability-service markets than to the hourly energy markets. Responsive loads are frequently significantly faster and more accurate than generators, increasing power system reliability. Incorporating fast load response into microgrids further extends the reliability response capabilities that can be offered to the interconnected power system. The paper discusses the desired reliability responses, why this matches some loads' capabilities, what the advantages are for the power system, implications for communications and monitoring requirements, and how this resource can be exploited.

Kirby, Brendan J [ORNL

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Utility interface requirements for a solar power system  

DOE Green Energy (OSTI)

This study specifies that the southern tier of the US (south of the 36th parallel) should be examined to see what problems might develop with the installation of a Satellite Power System (SPS) in the year 2000. One or more 5-GW SPS units could be installed in the utility systems of the southern states in the year 2000. The 345- and 500-kV transmission systems that will probably exist at that time could be readily extended to accommodate the SPS units. The operation of the units will present the utilities with new and difficult problems in system stability and frequency control. The problems will arise because a somewhat variable 5-GW output will be produced by a generator having no mechanical inertia. The unavoidable time lag in controlling the position of the energy beam at the receiving station may have a very critical effect on the stability of the utility systems. The maintenance problems associated with the energy-receiving device, a continuous structure covering more than 40 mi/sup 2/, must be given careful consideration. Repair of lightning damage while maintaining SPS operation may be the most critical requirement. Acquisition and preparation of the 90 mi/sup 2/ land required for the receiving antenna (rectenna) will create many new and difficult environmental problems.

Donalek, P.J.; Whysong, J.L.

1978-09-01T23:59:59.000Z

142

Standardized DOE Spent Nuclear Fuel Canister and Transportation System for Shipping to the National Repository  

SciTech Connect

The U.S.Department of Energy’s (DOE) National Spent Nuclear Fuel Program (NSNFP), located at the Idaho National Engineering and Environmental Laboratory (INEEL), has been chartered with the responsibility for developing spent nuclear fuel (SNF) standardized canisters and a transportation cask system for shipping DOE SNF to the national repository. The mandate for this development is outlined in the Memorandum of Agreement for Acceptance of Department of Energy Spent Nuclear Fuel and High-Level Radioactive Waste that states, “EM shall design and fabricate … DOE SNF canisters for shipment to RW.” (1) It also states, “EM shall be responsible for the design, NRC certification, and fabrication of the transportation cask system for DOE SNF canisters or bare DOE SNF in accordance with 10 CFR Part 71.” (2) In fulfillment of these requirements, the NSNFP has developed four SNF standardized canister configurations and has conceptually designed a versatile transportation cask system for shipping the canisters to the national repository.1 The standardized canister sizes were derived from the national repository waste package design for co-disposal of SNF with high-level waste (HLW). One SNF canister can be placed in the center of the waste package or one can be placed in one of five radial positions, replacing a HLW canister. The internal cavity of the transportation cask was derived using the same logic, matching the size of the internal cavity of the waste package. The size of the internal cavity for the transportation cask allows the shipment of multiple canister configurations with the application of a removable basket design. The standardized canisters have been designed to be loaded with DOE SNF, placed into interim storage, shipped to the national repository, and placed in a waste package without having to be reopened. Significant testing has been completed that clearly demonstrates that the standardized canisters can safely achieve their intended design goals. The transportation cask system will include all of the standard design features, with the addition of dual containment for the shipment of failed fuel. The transportation cask system will also meet the rigorous licensing requirements of the Nuclear Regulatory Commission (NRC) to ensure that the design and the methods of fabrication employed will result in a shipping cask that will safely contain the radioactive materials under all credible accident scenarios. The standardization of the SNF canisters and the versatile design of the transportation cask system will eliminate a proliferation of designs and simplify the operations at the user sites and the national repository.

Pincock, David Lynn; Morton, Dana Keith; Lengyel, Arpad Leslie

2001-02-01T23:59:59.000Z

143

Lecture 22 [the second ]: Standards, protocols and regulations in Architecting Engineering Systems  

E-Print Network (OSTI)

Appreciate the critical role of standards in architecting engineering systems Understand the varying purposes and formation processes for standards as well as the interests of various academic disciplines in studying standards Explore some social and technical factors influencing standard formation Examine the Internet Standards as an interactive and evolving set of artifacts by using network analysis tools Professor C. Magee, 2006

Professor C. Magee

2006-01-01T23:59:59.000Z

144

Electric Bike Sharing--System Requirements and Operational Concepts  

DOE Green Energy (OSTI)

Bike sharing is an exciting new model of public-private transportation provision that has quickly emerged in the past five years. Technological advances have overcome hurdles of early systems and cities throughout the globe are adopting this model of transportation service. Electric bikes have simultaneously gained popularity in many regions of the world and some have suggested that shared electric bikes could provide an even higher level of service compared to existing systems. There are several challenges that are unique to shared electric bikes: electric-assisted range, recharging protocol, and bike and battery checkout procedures. This paper outlines system requirements to successfully develop and deploy an electric bike sharing system, focusing on system architecture, operational concepts, and battery management. Although there is little empirical evidence, electric bike sharing could be feasible, depending on demand and battery management, and can potentially improve the utility of existing bike sharing systems. Under most documented bike sharing use scenarios, electric bike battery capacity is insufficient for a full day of operation, depending on recharging protocol. Off-board battery management is a promising solution to address this problem. Off-board battery management can also support solar recharging. Future pilot tests will be important and allow empirical evaluation of electric bikesharing system performance. (auth)

Cherry, Christopher; Worley, Stacy; Jordan, David

2010-08-01T23:59:59.000Z

145

High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 1  

SciTech Connect

The purpose of this Requirements Identification Document (RID) section is to identify, in one location, all of the facility specific requirements and good industry practices which are necessary or important to establish an effective Issues Management Program for the Tank Farm Facility. The Management Systems Functional Area includes the site management commitment to environmental safety and health (ES&H) policies and controls, to compliance management, to development and management of policy and procedures, to occurrence reporting and corrective actions, resource and issue management, and to the self-assessment process.

Not Available

1994-04-01T23:59:59.000Z

146

Standard-B hydrogen monitoring system acceptance test report  

DOE Green Energy (OSTI)

Test Engineering was supported by Tank Waste Remediation System Safety Programs Engineering Support in the performance of an Acceptance Test Procedure (ATP) to qualify the Standard Hydrogen Monitoring System (SHMS) cabinet installed on waste tank 241-SY-103. The June 7, 1994 ATP performance was controlled by West Waste Tank Farms work package 2W-94-322. The ATP was conducted following the final installation of a second Whittaker electro-chemical hydrogen monitoring cell. The cabinet had been sited on the waste tank two years earlier, but never connected to the exhaust vent header to monitor Tank 241-SY-103 vent header exhaust gases. The cabinet was then modified, to remove two undesirable solid state hydrogen monitors and install a second Whittaker electro-chemical hydrogen monitoring sensor and signal conditioning. The ATP was used to assure that the cabinet wiring and components were properly installed and labeled and that the two years without operation had not seriously damaged the installed equipment. Electrical and pneumatic tests were performed to assure system integrity.

Tran, T.T.

1994-09-08T23:59:59.000Z

147

Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2  

SciTech Connect

This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

Cote, R.F.

1993-11-01T23:59:59.000Z

148

Development requirements for an advanced gas turbine system  

Science Conference Proceedings (OSTI)

In cooperation with US Department of Energy`s Morgantown Energy Technology Center, a Westinghouse-led team is working on the second part of an 8-year, Advanced Turbine Systems Program to develop the technology required to provide a significant increase in natural gas-fired combined cycle power generation plant efficiency. This paper reports on the Westinghouse program to develop an innovative natural gas-fired advanced turbine cycle, which, in combination with increased firing temperature, use of advanced materials, increased component efficiencies, and reduced cooling air usage, has the potential of achieving a lower heating value plant efficiency in excess of 60%.

Bannister, R.L.; Cheruvu, N.S.; Little, D.A.; McQuiggan, G. [Westinghouse Electric Corp., Orlando, FL (United States)

1995-10-01T23:59:59.000Z

149

Search Hanford accessible reports electronically system requirements specification  

SciTech Connect

The Emergency, Safety, & Quality (ESQ) Services organization of Westinghouse Hanford Company (WHC) is experiencing changes related to new programs. The programs include Corrective Actions Management Systems, Self-Assessment, Trend Analysis, and Lessons Learned analysis. The programs are pushing up organizational costs while funding and manpower levels are projected to be dropping. A large cost involved in implementing the new programs is the cost for people to locate unstructured information required to make decisions or write documentation. But, most resources for retrieving information are found in structured database systems. This means that unstructured information that must be located has to be found by one of these methods: (1) searching manually through documents, (2) searching individual documents one at a time with word processing programs, (3) searching through text fields with query systems primarily designed for structured database information, or (4) develop a text search and retrieval system designed for unstructured information. One example of this is using Occurrence Reporting Processing System (ORPS) and Quality, Environmental, and Safety Tracking (QUEST) documents. An explanation of this is in the following textual box.

Willers, K.J.

1994-02-28T23:59:59.000Z

150

Stationary and Portable Fuel Cell Systems Codes and Standards Citations (Brochure)  

DOE Green Energy (OSTI)

This document lists codes and standards typically used for U.S. stationary and portable fuel cell systems.

Not Available

2011-05-01T23:59:59.000Z

151

Solar power system requiring no active control device  

SciTech Connect

A solar power system has a photovoltaic array having a locus of peak power points for various insolation levels, a voltage-dependent variable resistance load such as a water electrolysis unit electrically connected to the array, and a demand-dependent variable resistance load such as a dc to ac inverter connected in parallel with the electrolysis unit. The electrolysis unit or other voltage-dependent variable resistance load has a voltage-current characteristic in which the operating point is displaced from the array's peak power point for most insolation levels. The characteristic is displaced towards higher voltage-lower current operating points. The inverter may move the operating point of the photovoltaic array toward its peak power point when the load requires power. The system may be designed so that the array operates within about 5 percent of its peak power point over a wide range of inverter power demands. A fuel cell may be connected in parallel with the array to provide power to the inverter at low insolation levels, at night or in low sunlight. The fuel cell may use the hydrogen produced by the electrolysis unit for fuel. The total photovoltaic power made available by the system of this invention is generally greater than 95 percent and often greater than 98 percent of the maximum power which the photovoltaic array may produce for many insolation levels.

Tison, R.R.

1982-07-27T23:59:59.000Z

152

OA-50 Office Specific Qualification Standard for ES&H Systems...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF ENVIRONMENT SAFETY AND HEALTH (ES&H) EVALUATIONS ES&H SYSTEMS ASSESSORAPPRAISER QUALIFICATION STANDARD FUNCTIONAL AREA Environment, Safety and Health Systems Assessor...

153

A Summary of Control System Security Standards Activities in the Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Summary of Control System Security Standards Activities in the A Summary of Control System Security Standards Activities in the Energy Sector (October 2005) A Summary of Control System Security Standards Activities in the Energy Sector (October 2005) This document is a compilation of the activities and initiatives concerning control system security that are influencing the standards process in the development of secure communication protocols and systems. Also contained in this report is a comparison of several of the sector standards, guidelines, and technical reports, demonstrating standards coverage by security topic. This work focuses on control systems standards applicable to the energy (oil, gas, and electric, but not nuclear) sector. Summary of CS Standards Activities in the Energy Sector.pdf More Documents & Publications

154

Engineering task plan for standard hydrogen monitoring system operation  

DOE Green Energy (OSTI)

Tanks that are known or suspected to retain and occasionally release flammable gases are equipped with Standard Hydrogen Monitoring System (SHMS) cabinets. These cabinets contain Whittaker{trademark} electrochemical cells and may also have a gas chromatograph (GC) and/or a Bruel and Kjaer infrared photo-acoustic multi-gas monitor (B and K). The GC and B and K will be referred to collectively as ''analytical instruments'' in this document. Using these instruments, a tank can be monitored for hydrogen, ammonia, methane, and nitrous oxide. Air from the tank vent header (for actively ventilated tanks) or dome space (for passively ventilated tanks) is drawn continuously through the monitoring instruments via a sample pump. This monitoring is performed to track the gas release behavior of selected waste storage tanks and to help identify any potentially serious gas release behavior. Vapor grab samples are obtained from the SHMS as well and are analyzed with a mass spectrometer to obtain concentration data about hydrogen and other gases.

MCCAIN, D.J.

1999-06-02T23:59:59.000Z

155

Public agency cost savings from standardizing energy management temperature control systems  

SciTech Connect

In 1992, the city of Phoenix, AZ, standardized its energy management temperature control systems (EMTCS) in the construction of a 5-year series of projects that included a new library, city hall, renovated art museum, a museum of science and technology, a parking garage, and a rebuilt municipal building. This article presents an evaluation of the city`s philosophy for the standardization of EMTCS equipment, the issue of interconnectibility, and development and procurement guidance. Our research indicates that the perception that front-end costs increase when EMTCS work is not bid competitively is exaggerated. We also found that it is easier for private businesses to make sole source procurement decisions than it is for governments, because businesses are not constrained by laws that require awarding contracts to the lowest bidder. 1 tab.

Mayo, R.E.; Badger, W.W.; Bashford, H.H.

1995-04-01T23:59:59.000Z

156

Functions and Requirements and Specifications for Replacement of the Computer Automated Surveillance System (CASS)  

SciTech Connect

Functional requirements and specifications document for system to replace tank farm computer automated waste tank surveillance system.

DOUKA, K.C.

2000-05-05T23:59:59.000Z

157

AMI System Security Requirements - v1_01-1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AMI System Security Requirements - v101-1 AMI System Security Requirements - v101-1 This document provides the utility industry and vendors with a set of security requirements...

158

System 80+{trademark} Standard Design: CESSAR design certification. Volume 9: Amendment I  

Science Conference Proceedings (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80{sup +}{trademark} Standard Design. This volume 9 discusses Electric Power and Auxiliary Systems.

Not Available

1990-12-21T23:59:59.000Z

159

System 80+{trademark} Standard Design: CESSAR design certification. Volume 3: Amendment I  

SciTech Connect

This report, entitled Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These documents describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design. This report, Volume 3, in conjunction with Volume 2, provides the design of structures, components, equipment and systems.

Not Available

1990-12-21T23:59:59.000Z

160

System 80+{trademark} Standard Design: CESSAR design certification. Volume 2: Amendment I  

SciTech Connect

This report, entitled Combustion Engineering Standard Safety Analysis Report - Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These documents describe the Combustion Engineering, Inc. System 80+{sup TM} Standard Design. This report, Volume 2, in conjunction with Volume 3, provides the design of structures, components, equipment and systems.

Not Available

1990-12-21T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

System 80+{trademark} Standard Design: CESSAR design certification. Volume 10: Amendment I  

Science Conference Proceedings (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80{sup +}{trademark} Standard Design. This volume 10 discusses the Steam and Power Conversion System and Radioactive Waste Management.

Not Available

1990-12-21T23:59:59.000Z

162

Energy Department Releases Study of Electricity System Ahead of Proposed EPA Air Quality Standards  

Energy.gov (U.S. Department of Energy (DOE))

In anticipation of forthcoming Environmental Protection Agency proposals for clean air standards, DOE released a new report examining the potential impact those proposed standards could have on the reliability of our nation’s energy systems.

163

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

E-Print Network (OSTI)

Actuarial Pricing Of Energy Efficiency Projects: Lessonsand Effectiveness of Energy Efficiency Programs,” LBNL-ACEEE 2010. “State Energy Efficiency Resource Standard (

Schiller, Steven R.

2011-01-01T23:59:59.000Z

164

Fulfilled and missed requirements for online reservation systems: an empirical investigation of austrian and swiss hotels  

Science Conference Proceedings (OSTI)

Temporal data are a core element of a reservation. In this paper we formulate 10 requirements and 14 sub-requirements for handling temporal data in online hotel reservation systems (OHRS) from a usability viewpoint. We test the fulfillment of these requirements ... Keywords: B2C systems, requirements engineering, reservation systems, temporal data, tests, travel, usability

Gerhard F. Knolmayer, Viola Sini, Polina Chelnokova

2013-07-01T23:59:59.000Z

165

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(S.B. 680) requiring the Illinois Commerce Commission (ICC) to establish standards for net metering and interconnection for renewable energy systems by April 1, 2008....

166

Voting Systems Performance and Test Standards: An Overview  

E-Print Network (OSTI)

). This overview serves as a companion document for understanding and interpreting both Volume I, the performance provisions of the Standards, and Volume II, the testing specifications. Background The program to develop) produced a joint report, Effective Use of Computing Technology in Vote Tallying. This report concluded

Rivest, Ronald L.

167

Sticking to standards; technical and other isomorphic pressures in deploying ERP-systems  

Science Conference Proceedings (OSTI)

This paper focuses on how and to what extent homogenization coincides with the deployment of ERP-systems. Using the work of DiMaggio and Powell on isomorphic pressures, we argue that the use of ERP-systems may in several ways lead to standardization ... Keywords: ERP-systems, Enactment, Homogenization, Inscription, Standardization, Technical isomorphism

Jos Benders; Ronald Batenburg; Heico van der Blonk

2006-03-01T23:59:59.000Z

168

The family of standard hydrogen monitoring system computer software design description: Revision 2  

DOE Green Energy (OSTI)

In March 1990, 23 waste tanks at the Hanford Nuclear Reservation were identified as having the potential for the buildup of gas to a flammable or explosive level. As a result of the potential for hydrogen gas buildup, a project was initiated to design a standard hydrogen monitoring system (SHMS) for use at any waste tank to analyze gas samples for hydrogen content. Since it was originally deployed three years ago, two variations of the original system have been developed: the SHMS-B and SHMS-C. All three are currently in operation at the tank farms and will be discussed in this document. To avoid confusion in this document, when a feature is common to all three of the SHMS variants, it will be referred to as ``The family of SHMS.`` When it is specific to only one or two, they will be identified. The purpose of this computer software design document is to provide the following: the computer software requirements specification that documents the essential requirements of the computer software and its external interfaces; the computer software design description; the computer software user documentation for using and maintaining the computer software and any dedicated hardware; and the requirements for computer software design verification and validation.

Bender, R.M.

1994-11-16T23:59:59.000Z

169

Towards a standards-based autonomic context management system  

Science Conference Proceedings (OSTI)

Pervasive computing applications must be sufficiently autonomous to adapt their behaviour to changes in computing resources and user requirements. This capability is known as context-awareness. In some cases, context-aware applications must be implemented ...

Jadwiga Indulska; Karen Henricksen; Peizhao Hu

2006-09-01T23:59:59.000Z

170

System 80+{trademark} Standard Design: CESSAR design certification. Volume 18: Amendment I  

SciTech Connect

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80+{trademark} Standard Design. This Volume 18 provides Appendix B, Probabilistic Risk Assessment.

Not Available

1990-12-21T23:59:59.000Z

171

System 80+{trademark} Standard Design: CESSAR design certification. Volume 8: Amendment I  

SciTech Connect

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80{sup +}{trademark} Standard Design. This volume 8 provides a description of instrumentation and controls.

Not Available

1990-12-21T23:59:59.000Z

172

System 80+{trademark} Standard Design: CESSAR design certification. Volume 11: Amendment I  

Science Conference Proceedings (OSTI)

This report, entitled Combustion Engineering Standard Safety Analysis Report -- Design Certification (CESSAR-DC), has been prepared in support of the industry effort to standardize nuclear plant designs. These volumes describe the Combustion Engineering, Inc. System 80{sup +}{trademark} Standard Design. This volume 11 discusses Radiation Protection, Conduct of Operations, and the Initial Test Program.

Not Available

1990-12-21T23:59:59.000Z

173

Stationary and Portable Fuel Cell Systems Codes and Standards Citations (Brochure), NREL (National Renewable Energy Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Stationary and Portable Fuel Cell Systems Codes and Standards Citations This document lists codes and standards typically used for Stationary and Portable Fuel Cell Systems projects. To determine which codes and standards apply to a specific project, you need to identify the codes and standards currently in effect within the jurisdiction where the project will be located. Some jurisdictions also have unique applicable ordinances or regulations. Learn about codes and standards basics at www.afdc.energy.gov/afdc/codes_standards_basics.html. Find Stationary and Portable Fuel Cell Systems codes and standards in these categories:

174

OA-50 Office Specific Qualification Standard for ES&H Systems Assessor/Appraiser, October 2003  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF ENVIRONMENT SAFETY AND HEALTH (ES&H) OFFICE OF ENVIRONMENT SAFETY AND HEALTH (ES&H) EVALUATIONS ES&H SYSTEMS ASSESSOR/APPRAISER QUALIFICATION STANDARD FUNCTIONAL AREA Environment, Safety and Health Systems Assessor/Appraiser An environmental, safety and health system assessor/appraiser is that person who is normally at the GS 13 through 15 level, Excepted Service or Senior Level and assigned the responsibility to assess and evaluate management systems, environmental, safety and health programs and technical activities associated with DOE nuclear and non-nuclear facilities. PURPOSE The environmental, safety and health systems assessor/appraiser functional area qualification standard establishes common functional area competency requirements for all technical personnel in the Office of Environmental Safety and Health Evaluations. Satisfactory and

175

Functions and Requirements and Specifications for Replacement of the Computer Automated Surveillance System (CASS)  

SciTech Connect

This functions, requirements and specifications document defines the baseline requirements and criteria for the design, purchase, fabrication, construction, installation, and operation of the system to replace the Computer Automated Surveillance System (CASS) alarm monitoring.

SCAIEF, C.C.

1999-12-16T23:59:59.000Z

176

A catalogue of functional software requirement patterns for the domain of content management systems  

Science Conference Proceedings (OSTI)

Software requirement patterns have been proposed as an artifact for fostering requirements reuse. When we define these patterns for the functional part of a software system, we realize that most of patterns are specific of a software domain. This paper ... Keywords: functional requirements, requirements reuse, software requirement patterns

C. Palomares; C. Quer; X. Franch; S. Renault; C. Guerlain

2013-03-01T23:59:59.000Z

177

(Terminology standardization)  

SciTech Connect

Terminological requirements in information management was but one of the principal themes of the 2nd Congress on Terminology and Knowledge Engineering. The traveler represented the American Society for Testing and Materials' Committee on Terminology, of which he is the Chair. The traveler's invited workshop emphasized terminology standardization requirements in databases of material properties as well as practical terminology standardizing methods. The congress included six workshops in addition to approximately 82 lectures and papers from terminologists, artificial intelligence practitioners, and subject specialists from 18 countries. There were approximately 292 registrants from 33 countries who participated in the congress. The congress topics were broad. Examples were the increasing use of International Standards Organization (ISO) Standards in legislated systems such as the USSR Automated Data Bank of Standardized Terminology, the enhanced Physics Training Program based on terminology standardization in Physics in the Chinese province of Inner Mongolia, and the technical concept dictionary being developed at the Japan Electronic Dictionary Research Institute, which is considered to be the key to advanced artificial intelligence applications. The more usual roles of terminology work in the areas of machine translation. indexing protocols, knowledge theory, and data transfer in several subject specialties were also addressed, along with numerous special language terminology areas.

Strehlow, R.A.

1990-10-19T23:59:59.000Z

178

Implementing Performance-Based Sustainability Requirements for the Low Carbon Fuel Standard – Key Design Elements and Policy Considerations  

E-Print Network (OSTI)

requirements for corn ethanol, cellulosic biofuel, andmoderate than those of corn ethanol (OECD 2008; Searchingergeneration biofuels such as corn ethanol, but at the cost of

Yeh, Sonia; Sumner, Daniel A.; Kaffka, Stephen R.; Ogden, J; Jenkins, Bryan M.

2009-01-01T23:59:59.000Z

179

Meeting Residential Ventilation Standards Through Dynamic Control of Ventilation Systems  

E-Print Network (OSTI)

Rudd. 2007. Review of residential ventilation technologies.2009. EISG Final Report: Residential Integrated VentilationDesign and Operation of Residential Cooling Systems. Proc.

Sherman, Max H.

2011-01-01T23:59:59.000Z

180

Standard Compliance: Guidelines to Help State and Alternative Fuel Provider Fleets Meet Their Energy Policy Act Requirements, 10 CFR Part 490 (Book)  

SciTech Connect

This guidebook addresses the primary requirements of the Alternative Fuel Transportation Program to help state and alternative fuel provider fleets comply with the Energy Policy Act via the Standard Compliance option. It also addresses the topics that covered fleets ask about most frequently.

Not Available

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Standard hydrogen monitoring system (SHMS) engineering task plan  

DOE Green Energy (OSTI)

This document details the responsibilities and requirements for the design, technical documents, fabrication, testing, and installation of the SHMS-E and SHMS-E+ continuous gas monitors. The SHMS-E is identical in function to a SHMS-B but has the interface to accommodate an analytical module containing a gas chromatograph and a B and K photo acoustic gas monitor. Temporary addition of the analytical module adds the ``+`` to the SHMS-E designation. The analytical module is temporary in all installations.

Tate, D.D.

1997-05-01T23:59:59.000Z

182

Field Guide: Inspection of Transmission Line Grounding Systems (Standard PDF)  

Science Conference Proceedings (OSTI)

This EPRI report, one in a series of practical guides designed as reference aids for utility personnel working in the field, visually catalogs the various condition issues that commonly affect transmission line grounding systems. It presents photographs and short written descriptions of the conditions and lists associated causes, failure modes, and impacts. The guide is printed in color on high-quality paper and is ring-bound. It is therefore recommended that members order printed copies rather than ...

2012-11-06T23:59:59.000Z

183

Standard Hydrogen Monitoring System-C operation and maintenance manual  

DOE Green Energy (OSTI)

The primary function of the SHMS-C is to monitor specifically for hydrogen in the waste tank vapor space which may also contain (but not be limited to) unknown quantities of air, nitrous oxide (N{sub 2}O), ammonia (NH{sub 3}), water vapor, carbon dioxide (CO{sub 2}), carbon monoxide (CO) and other gaseous constituents. An electronically controlled grab sampler has replaced the manually operated sample system that was used in the original SHMS enclosure. Samples can now be operator or automatically initiated. Automatic initiation occurs based on the high hydrogen alarm level. Once a sample is obtained it is removed from the sampler and transported to a laboratory for analysis. This system is used to identify other gaseous constituents which are not measured by the hydrogen monitor. The design does not include any remote data acquisition or remote data logging equipment but provides a 4--20 mA dc process signals, and discrete alarm contacts, that can be utilized for remote data logging and alarming when desired. The SHMS-C arrangement consists of design modifications (piping, valves, filters, supports) to the SHMS-B arrangement necessary for the installation of a dual column gas chromatograph and associated sample and calibration gas lines. The gas chromatograph will provide real time, analytical quality, specific hydrogen measurements in low and medium range concentrations. The system is designed to sample process gases that are classified by NEC code as Class 1, Division 1, Group B.

Schneider, T.C.

1997-05-01T23:59:59.000Z

184

Software Requirements for a System to Compute Mean Failure Cost  

SciTech Connect

In earlier works, we presented a computational infrastructure that allows an analyst to estimate the security of a system in terms of the loss that each stakeholder. We also demonstrated this infrastructure through the results of security breakdowns for the ecommerce case. In this paper, we illustrate this infrastructure by an application that supports the computation of the Mean Failure Cost (MFC) for each stakeholder.

Aissa, Anis Ben [University of Tunis, Belvedere, Tunisia; Abercrombie, Robert K [ORNL; Sheldon, Frederick T [ORNL; Mili, Ali [New Jersey Insitute of Technology

2010-01-01T23:59:59.000Z

185

Software requirements specification for the program analysis and control system risk management module  

Science Conference Proceedings (OSTI)

TWR Program Analysis and Control System Risk Module is used to facilitate specific data processes surrounding the Risk Management program of the Tank Waste Retrieval environment. This document contains the Risk Management system requirements of the database system.

SCHAEFER, J.C.

1999-06-02T23:59:59.000Z

186

System Design Description and Requirements for Modeling the Off-Gas Systems for Fuel Recycling Facilities  

Science Conference Proceedings (OSTI)

This document provides descriptions of the off-gases evolved during spent nuclear fuel processing and the systems used to capture the gases of concern. Two reprocessing techniques are discussed, namely aqueous separations and electrochemical (pyrochemical) processing. The unit operations associated with each process are described in enough detail so that computer models to mimic their behavior can be developed. The document also lists the general requirements for the desired computer models.

Daryl R. Haefner; Jack D. Law; Troy J. Tranter

2010-08-01T23:59:59.000Z

187

TWRS hydrogen mitigation portable standard hydrogen monitoring system platform design and fabrication engineering task plan  

DOE Green Energy (OSTI)

The primary function of portable gas monitoring is to quickly determine tank vapor space gas composition and gas release rate, and to detect gas release events. Characterization of the gas composition is needed for safety analysis. The lower flammability limit, as well as the peak burn temperature and pressure, are dependent upon the gas composition. If there is little or no knowledge about the gas composition, safety analysis utilize compositions that yield the worst case in a deflagration or detonation. This conservative approach to unknowns necessitates a significant increase in administrative and engineering costs. Knowledge of the true composition could lead to reductions in the assumptions and therefore contribute to a reduction in controls and work restrictions. Also, knowledge of the actual composition will be required information for the analysis that is needed to remove tanks from the Watch List. Similarly, the rate of generation and release of gases is required information for performing safety analysis, developing controls, designing equipment, and closing safety issues. To determine release rate, both the gas concentrations and the dome space ventilation rates (exhauster flow rate or passive dome/atmosphere exchange rate) are needed. Therefore, to quickly verify waste tank categorization or to provide additional characterization for tanks with installed gas monitoring, a temporary, portable standard hydrogen monitoring system is needed that can be used to measure gas compositions at both high and low sensitivities.

Philipp, B.L.

1997-03-01T23:59:59.000Z

188

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

E-Print Network (OSTI)

rebatesincentives/ief/ PJM Forward Market Operations 2010. "PJM Manual 18B: Energy Efficiency Measurement &Independent System Operator 13 and PJM Regional Transmission

Schiller, Steven R.

2011-01-01T23:59:59.000Z

189

Concentrator Photovoltaic Qualification Standards for Systems Using Refractive and Reflective Optics: Preprint  

DOE Green Energy (OSTI)

This paper describes a proposed international qualification standard for photovoltaic (PV) systems generating electricity from concentrated sunlight. The standard's purpose is to provide stress tests and procedures to identify any component weaknesses in a system. If no weaknesses are identified during qualification, both the manufacturer and the customer can expect a more reliable product. In 2002, we began developing the standard, under the auspices of the International Electrotechnical Commission (IEC), that would describe testing procedures for concentrator PV systems using reflecting (mirrors) or refractive (lenses) optics for focusing sunlight onto solar cells. The initial draft of the IEC standard was based on the first concentrator PV qualification standard published by the Institute of Electrical and Electronics Engineers (IEEE) in the United States in 2001. Well-developed U.S. concentrator technologies use refractive optics, and the IEEE standard needed improvement for testing systems with reflective optics. Furthermore, with record III-V solar cell efficiencies above 37%, concentrator PV developers around the world would like to incorporate such cells into their next generation of technologies. The paper will highlight significant differences between the proposed IEC standard and the earlier IEEE standard.

McConnell, R.; Ji, L.; Lasich, J.; Mansfield, R.

2004-06-01T23:59:59.000Z

190

Universal software safety standard  

Science Conference Proceedings (OSTI)

This paper identifies the minimum subset required for a truly universal safety-critical software standard. This universal software standard could be used in but is not limited to the following application domains: commercial, military and space ... Keywords: software safety, system safety, validation, verification

P. V. Bhansali

2005-09-01T23:59:59.000Z

191

CSP 543: Multimedia Networking Atel Puri, Tsuhan Chen, Multimedia Systems, Standards, and Networks, ISBN 082479303X  

E-Print Network (OSTI)

CSP 543: Multimedia Networking Texts Atel Puri, Tsuhan Chen, Multimedia Systems, Standards Wireless 6 hours Total 45 hours Edited March 2006 (html, css checks) CSP 543: Multimedia Networking - CS

Heller, Barbara

192

Development of standardized, low-cost AC PV systems. Phase I annual report, 7 September 1995--7 November 1996  

DOE Green Energy (OSTI)

The objectives of this two-year program are to improve the reliability and safety and reduce the cost of installed grid-connected PV systems by creating standardized, pre-engineered components and an enhanced, low-cost, 250-Watt micro inverter. These advances will be combined with the new, large area Solarex MSX-240 PV module resulting in standard, modular AC PV {open_quotes}building blocks{close_quotes} used to create utility-interactive PV systems as small as one module to many thousands of modules to suit virtually any application. AC PV building blocks will be developed to meet the requirements of the U.S., Japanese and European markets.

Strong, S.J.; Wohlgemuth, J.H.; Kaelin, M.

1997-06-01T23:59:59.000Z

193

Development and performance analysis of a standard orifice flow calibration system  

Science Conference Proceedings (OSTI)

An orifice flow system has been developed indigenously which is a primary standard for the calibration of high vacuum gauges in the range of 10{sup -3}-10{sup -6} mbar. It consists of a constant-volume flow meter, designed to generate a known flow rate of a particular gas to the vacuum chamber. This chamber is partitioned into two parts by a plate with an orifice of calculable conductance. The pressures, generated by this standard system, are compared with those of secondary standard, namely, spinning rotor gauge. Different uncertainties and correction factors are calculated. The maximum percentage deviation is from 1.16% to 0.97%. The combined uncertainties over the entire calibration range of the standard system are in the range of 4.0x10{sup -6} mbar.

Akram, H. M.; Maqsood, M.; Rashid, H. [NINVAST, National Centre for Physics Complex, Shahdara Valley Road, P.O. Box 3125, Islamabad (Pakistan)

2009-07-15T23:59:59.000Z

194

City of San Jose- Solar Hot Water Heaters & Photovoltaic Systems Permit Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Building, Planning and Electrical Permits are required for Photovoltiac (PV) systems installed in San Jose. In most cases, PV systems must also undergo a Building Plan Review and an Electrical...

195

NASA low power DIPS [Dynamic Isotope Power System] conceptual design requirements document  

DOE Green Energy (OSTI)

This document describes the requirements for a low power (0.5--1.0 kwe) Dynamic Isotope Power System (DIPS) for interplanetary and space exploration missions using the Mariner Mark II spacecraft. The reference mission used to establish these requirements was the Cassini orbiter mission to Saturn. Requirements specific to two other missions (Outer Planet Orbiter/Probe and Comet Nucleus Sample Return) are also included. A list of references used to develop these requirements is provided. 17 refs., 2 figs., 2 tabs.

Johnson, G.; Determan, W.; Otting, W.

1990-01-01T23:59:59.000Z

196

ENVIRONMENTAL (INTERIOR) DESIGN Industry standard operating system for Environmental Design is Windows.  

E-Print Network (OSTI)

is Windows. A computer with at least: 2.8 GHz or higher dual or quad 4GB Memory (8 GB recommended) 500GB hardCAD Revit -- FREE Windows Operating System and Bootcamp (for Mac users to run PC sofware) Google Sketchup Pro -- for a fee, we don't use standard Sketchup Microsoft Windows 7 64bit Operating System (or use

Peterson, Blake R.

197

Preliminary design requirements document for the initial single-shell tank retrieval system  

Science Conference Proceedings (OSTI)

The scope of this Preliminary Design Requirements Document is to identify and define the functions, with associated requirements, which must be performed to demonstrate and accomplish the initial single-shell tank saltcake retrieval from selected tanks. This document sets forth functions, requirements, performance requirements and design constraints necessary to begin conceptual design for the Initial Single-shell Tank Retrieval System. System and physical interfaces between the Initial Single-shell Tank Retrieval System project and the Tank Waste Remediation are identified. The constraints, performance requirements, and transfer of information and data across a technical interface will be documented in an Interface Control Document. The design requirements provided in this document will be augmented by additional detailed design to be documented by the project.

Hertzel, J.S., Westinghouse Hanford

1996-07-24T23:59:59.000Z

198

The Impact of Solar Photovoltaic Generation on Balancing Requirements in the Southern Nevada System  

Science Conference Proceedings (OSTI)

Abstract—The impact of integrating large-scale solar photovoltaic (PV) generation on the balancing requirements in terms of regulation and load-following requirements in the southern Nevada balancing area is evaluated. The “swinging door” algorithm and the “probability box” method developed by Pacific Northwest National Laboratory (PNNL) were used to quantify the impact of large PV generation on the balancing requirements of the system operations. The system’s actual scheduling, real-time dispatch and regulation processes were simulated. Different levels of distributed generation were also considered in the study. The impact of hourly solar PV generation forecast errors on regulation and load-following requirements was assessed. The sensitivity of balancing requirements with respect to real-time forecast errors of large PV generation was analyzed. Index Terms—Ancillary services, balancing requirements, load following, regulation, renewables integration, swinging door

Ma, Jian; Lu, Shuai; Hafen, Ryan P.; Etingov, Pavel V.; Makarov, Yuri V.; Chadliev, Vladimir

2012-05-07T23:59:59.000Z

199

Technical Guideline for Cyber Security Requirements and Life Cycle Implementation Guidelines for Nuclear Plant Digital Systems  

Science Conference Proceedings (OSTI)

Nuclear power plants face increasing regulatory requirements from the U.S. Nuclear Regulatory Commission (NRC) and the Federal Energy Regulatory Commission (FERC) for cyber security of digital devices, components, and systems. The focus of these cyber security requirements is to protect plant digital computer systems, communications systems, and networks from cyber attacks that would affect reactor safety or generation reliability. This EPRI guideline document provides technical guidance for addressing c...

2010-10-29T23:59:59.000Z

200

Industry-wide information systems standardization as collective action: the case of the U.S. residential mortgage industry  

Science Conference Proceedings (OSTI)

Vertical information systems (VIS) standards are technical specifications designed to promote coordination among the organizations within (or across) vertical industry sectors. Examples include the bar code, electronic data interchange (EDI) standards, ... Keywords: collective action, governance, heterogeneity of resources and interests, institutional support, intellectual property rights, public goods theory, technical design issues, vertical IS standards and standardization

M. Lynne Markus; Charles W. Steinfield; Rolf T. Wigand; Gabe Minton

2006-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2  

SciTech Connect

This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment.

BEVINS, R.R.

2000-03-24T23:59:59.000Z

202

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Solar Wind Program Info State Oregon Program Type Interconnection Provider Oregon Public Utility Commission Oregon has three separate interconnection standards: one for net-metered systems, one for small generator facilities (non-net metered systems) and one for large generator facilities (non-net metered systems). Oregon has also established separate net metering requirements and interconnection standards for the state's primary investor-owned utilities (PGE and

203

Nuclear Energy -- Knowledge Base for Advanced Modeling and Simulation (NE-KAMS) Code Verification and Validation Data Standards and Requirements: Fluid Dynamics Version 1.0  

SciTech Connect

V&V and UQ are the primary means to assess the accuracy and reliability of M&S and, hence, to establish confidence in M&S. Though other industries are establishing standards and requirements for the performance of V&V and UQ, at present, the nuclear industry has not established such standards or requirements. However, the nuclear industry is beginning to recognize that such standards are needed and that the resources needed to support V&V and UQ will be very significant. In fact, no single organization has sufficient resources or expertise required to organize, conduct and maintain a comprehensive V&V and UQ program. What is needed is a systematic and standardized approach to establish and provide V&V and UQ resources at a national or even international level, with a consortium of partners from government, academia and industry. Specifically, what is needed is a structured and cost-effective knowledge base that collects, evaluates and stores verification and validation data, and shows how it can be used to perform V&V and UQ, leveraging collaboration and sharing of resources to support existing engineering and licensing procedures as well as science-based V&V and UQ processes. The Nuclear Energy Knowledge base for Advanced Modeling and Simulation (NE-KAMS) is being developed at the Idaho National Laboratory in conjunction with Bettis Laboratory, Sandia National Laboratories, Argonne National Laboratory, Utah State University and others with the objective of establishing a comprehensive and web-accessible knowledge base to provide V&V and UQ resources for M&S for nuclear reactor design, analysis and licensing. The knowledge base will serve as an important resource for technical exchange and collaboration that will enable credible and reliable computational models and simulations for application to nuclear power. NE-KAMS will serve as a valuable resource for the nuclear industry, academia, the national laboratories, the U.S. Nuclear Regulatory Commission (NRC) and the public and will help ensure the safe, economical and reliable operation of existing and future nuclear reactors.

Greg Weirs; Hyung Lee

2011-09-01T23:59:59.000Z

204

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Residential Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Wind Energy Sources Solar Program Info State Vermont Program Type Interconnection Provider Vermont Public Service Board Vermont has adopted separate interconnection standards for net-metered energy systems that are 150 kW or less, and for all other distributed-generation (DG) systems. '''Interconnection Standards for Net-Metered Systems 150 kW or less''' Vermont requires electric utilities to offer net metering to all customers with photovoltaic (PV) systems, wind-energy systems, fuel cells or

205

EPA's Recommended Residential Radon Mitigation Standard of Practice EPA recommends the Standard Practice for Installing Radon Mitigation Systems in  

E-Print Network (OSTI)

Existing Low-Rise Residential Buildings * for residential radon mitigation. This voluntary, consensus-based standard was developed and issued by the American Society for Testing and Materials International, and is identified as ASTM E-2121. The Agency first cited ASTM E-2121 in 2003 as a national consensus standard appropriate for reducing radon in homes as far as practicable below the national action level of 4 picocuries per liter (pCi/L) in indoor air. As of May 2006, EPA no longer recommends, and will no longer distribute its own, superseded Radon Mitigation Standards (EPA 402-R-93-

unknown authors

2006-01-01T23:59:59.000Z

206

Integration of Distributed Resources in Electric Utility Systems: Functional Definition for Communication and Control Requirements  

Science Conference Proceedings (OSTI)

Accelerating commercialization of distributed resources (DR) has created the need for improved practices for integrating them with electric utility distribution systems. A functional definition of DR for defining communication and control requirements in electric utility distribution systems is provided. The report is a tool that readers can use in developing communication and control strategies for DR in specific distribution systems.

1998-12-11T23:59:59.000Z

207

A systems engineering process supporting the development of operational requirements driven federations  

Science Conference Proceedings (OSTI)

This paper proposes a systems engineering process utilizing the conceptual artifacts of the Model Driven Architecture (MDA) describing platform independent views of models to capture operational requirements, to derive essential tasks, and to combine ...

Andreas Tolk; Thomas G. Litwin; Robert H. Kewley

2008-12-01T23:59:59.000Z

208

Extending and automating a Systems-Theoretic hazard analysis for requirements generation and analysis.  

SciTech Connect

Systems Theoretic Process Analysis (STPA) is a powerful new hazard analysis method designed to go beyond traditional safety techniques - such as Fault Tree Analysis (FTA) - that overlook important causes of accidents like flawed requirements, dysfunctional component interactions, and software errors. While proving to be very effective on real systems, no formal structure has been defined for STPA and its application has been ad-hoc with no rigorous procedures or model-based design tools. This report defines a formal mathematical structure underlying STPA and describes a procedure for systematically performing an STPA analysis based on that structure. A method for using the results of the hazard analysis to generate formal safety-critical, model-based system and software requirements is also presented. Techniques to automate both the analysis and the requirements generation are introduced, as well as a method to detect conflicts between the safety and other functional model-based requirements during early development of the system.

Thomas, John (Massachusetts Institute of Technology)

2012-05-01T23:59:59.000Z

209

High Voltage Thermal Battery Reliability Required to Equal Inverter-Converter Systems  

SciTech Connect

MC-583 and XMC-650 circuits, including associated pulse transformers, are compare with the inverter-converter system typical of present fuses. The required probabilities of thermal battery shorts and opens are determined.

1955-06-14T23:59:59.000Z

210

Requirements for Commissioning HVAC Systems Using BEMS and Commissioning the BEMS Itself Based on Questionnaire Surveys  

E-Print Network (OSTI)

In this paper the present status and requirements for commissioning of HVAC Systems using Building Energy Management Systems (BEMS) and commissioning the BEMS itself are investigated and summarized. The information presented is based on the results of the questionnaire and interview survey of experts which was carried out in four countries; Japan, the USA, France and Canada. This paper intends to clarify the requirements and future scope of the above issues by analyzing similarities and differences between the countries.

Yoshida, H.; Vaezi-Nejad, H.; Choiniere, D.; Wang, F.

2004-01-01T23:59:59.000Z

211

Waste Receiving and Processing Facility Module 1 Data Management System Software Requirements Specification  

Science Conference Proceedings (OSTI)

This document provides the software requirements for Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.

Brann, E.C. II

1994-09-09T23:59:59.000Z

212

Why Energy Audits Aren't Enough: An Energy Management System is Required  

E-Print Network (OSTI)

An evaluation of the energy systems in a plant can be accomplished by different techniques which require different levels of effort. Three alternatives are described: Rational Analysis, Energy Audits and Energy Management by Utility Systems Metering. A progressively greater investment in time and funding is required; however, the results yield more information and greater accuracy about energy usage. It is recommended that the step beyond Energy Audits, an Energy Management System, be taken. The Energy Management System approach is worthwhile, and the additional time and funding will be returned in energy cost reductions.

Haft, A. J.

1980-01-01T23:59:59.000Z

213

Can ASHRAE Standard 62-1989 Requirements be Satisfied while Maintaining Moisture Control using Stock HVAC Equipment in Hot, Humid Climates?  

E-Print Network (OSTI)

Outdoor air intake rates are studied to determine their impacts on moisture control in buildings, especially in hot, humid climates. Key impacts of outdoor air intake rates can be readily modeled and studied using computer simulations of building energy costs. Increased ventilation rates create real capital and operating costs for building owners and operators, with implications beyond energy costs relating to increased ventilation requirements. In hot, humid climates, increased ventilation rates increase latent loads more than sensible loads, requiring lower sensible heat ratios. Stock HVAC package units and split systems are not available with the requisite sensible heat ratios, and cannot maintain moisture control in small commercial buildings without costly modifications.

Turner, S. C.

1996-01-01T23:59:59.000Z

214

Harmonization of Utility Common Information Model (CIM) with other IEC Power System Management Standards  

Science Conference Proceedings (OSTI)

EPRI has sponsored the development of a number of international standards which provide the basis for information exchange to support power system management. One of the most important is the Common Information Model (CIM), which is rapidly gaining acceptance throughout the world as a common semantic model to unify and integrate the data from a myriad of systems involved in support of real-time electric utility operations. As its acceptance as the basis for information integration grows and areas of appl...

2007-03-27T23:59:59.000Z

215

National Incident Management System (NIMS) Standards Review Panel Workshop Summary Report  

SciTech Connect

The importance and need for full compliant implementation of NIMS nationwide was clearly demonstrated during the Hurricane Katrina event, which was clearly expressed in Secretary Chertoff's October 4, 2005 letter addressed to the State's governors. It states, ''Hurricane Katrina was a stark reminder of how critical it is for our nation to approach incident management in a coordinated, consistent, and efficient manner. We must be able to come together, at all levels of government, to prevent, prepare for, respond to, and recover from any emergency or disaster. Our operations must be seamless and based on common incident management doctrine, because the challenges we face as a nation are far greater than capabilities of any one jurisdiction.'' The NIMS is a system/architecture for organizing response on a ''national'' level. It incorporations ICS as a main component of that structure (i.e., it institutionalizes ICS in NIMS). In a paper published on the NIMS Website, the following statements were made: ''NIMS represents a core set of doctrine, principles, terminology, and organizational processes to enable effective, efficient and collaborative incident management at all levels. To provide the framework for interoperability and compatibility, the NIMS is based on a balance between flexibility and standardization.'' Thus the NIC is challenged with the need to adopt quality SDO generated standards to support NIMS compliance, but in doing so maintain the flexibility necessary so that response operations can be tailored for the specific jurisdictional and geographical needs across the nation. In support of this large and complex challenge facing the NIC, the Pacific Northwest National Laboratory (PNNL) was asked to provide technical support to the NIC, through their DHS Science and Technology ? Standards Portfolio Contract, to help identify, review, and develop key standards for NIMS compliance. Upon examining the challenge, the following general process appears to be a reasonable approach for identifying and establishing existing standards that would be applicable to NIMS compliance. The suggested generalized steps to establishing existing SDO generated standards for NIMS compliance are: (1) establish search criteria from the NIMS and its support documents, (2) search SDO databases to identify key existing nationally and/or internationally recognized standards that have potential application to NIMS compliance needs, (3) review the identified standards against the specific component needs of the NIMS, (4) identify the pertinent aspects/components of those identified standards that clearly address specific NIMS compliance needs, (5) establish a process to adopt the pertinent standards, which includes the generation of formalized FEMA Guidance that identifies the specific NIMS component compliance needs addressed in the respective standard, (6) develop performance criteria for which to measure compliance with the identified NIMS components addressed by the respective adopted standard, and (7) adopt the standard, publish the guidance and performance criteria, and incorporate it into routine FEMA/NIC NIMS management operations. This review process will also help identify real gaps in standards for which new NIMS specific standards should be developed. To jump start this process and hopefully identify some key ''low hanging fruit'' standards the NIC could use to begin such a process, a panel of first-responder experts (familiar with the current standards of common use in the first-responder community) from various response disciplines was formed and a workshop held. The workshop included a pre-workshop information gathering process. This report discusses the workshop and its findings in detail.

Stenner, Robert D.; Kirk, Jennifer L.; Stanton, James R.; Shebell, Peter; Schwartz, Deborah S.; Judd, Kathleen S.; Gelston, Gariann M.

2006-02-07T23:59:59.000Z

216

CLASS DEVIATION FINDINGS AND DETERMINATION Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement at Federal Acquisition Regulation (FAR) 9.406-3(f)(1) and 9.407-3(e)(1) Findings 1. On March 23,2010, the FAR Council published a final rule in the Federal Register (75FR 14058), which amended FAR 9.4 to implement section 872 of the Duncan Hunter National Defense Authorization Act for FISCAL Year 2009. Section 872 requires the establishment of a data system containing specific information on the integrity and performance of covered Federal agency contractors and grantees. The data system created for this purpose is entitled Federal Awardee Performance and Integrity Information Systems (FAPIIS), and it can be located at www.ppirs.gov and www.cpars.csd.disa.mil.

217

Risk-Informed Safety Requirements for H2 Codes and Standards Development - DOE Hydrogen and Fuel Cells Program FY 2012 Annual Progress Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 FY 2012 Annual Progress Report DOE Hydrogen and Fuel Cells Program Aaron Harris (Primary Contact), Jeffrey LaChance, Katrina Groth Sandia National Laboratories P.O. Box 969 Livermore, CA 94551-0969 Phone: (925) 294-4530 Email: apharri@sandia.gov DOE Manager HQ: Antonio Ruiz Phone: (202) 586-0729 Email: Antonio.Ruiz@ee.doe.gov Project Start Date: October 1, 2003 Project End Date: Project continuation and direction determined annually by DOE Fiscal Year (FY) 2012 Objectives Present results of indoor refueling risk assessment to the * National Fire Protection Association (NFPA) 2 Fueling Working Group. Perform and document required risk assessment (with * input from NFPA 2 and others) for developing science- based risk-informed codes and standards for indoor

218

Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2  

SciTech Connect

This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope.

BEVINS, R.R.

2000-09-20T23:59:59.000Z

219

Requirements Specification for and Evaluation of an Automated Substation Monitoring System  

E-Print Network (OSTI)

- substation design engineers, protective relay engineers, dispatchers in the control centers etc. AnotherRequirements Specification for and Evaluation of an Automated Substation Monitoring System Mladen for the Automated Analysis Substation System (AASS) implemented at Texas A&M University, aimed at monitoring

220

Interim implementation structure for development of performance criteria and test standards for photovoltaic systems  

DOE Green Energy (OSTI)

This document presents an implementation structure for the near-term development of performance criteria and test methods for photovoltaic (PV) materials, components, subsystems, and systems. The approach is designed to be responsive to the Photovoltaic Research, Development and Demonstration Act of 1978 (PL-95-590). The project is organized into four tasks: (1) establishment of performance criteria and the development of test methods; (2) development of laboratory accreditation/product certification guidelines; (3) development of validation methodologies; and (4) coordination of the quality assurance effort with consensus standards and code organizations. A schedule and milestones are presented for each task. The appendices provide a brief overview of standards and the standards development process. The philosophy behind this project is to develop industry- and user-established performance criteria, test methods, and accreditation procedures which may then be referred to independent consensus standards organizations for the preparation of consensus standards. The emphasis in execution of this approach will be to develop uniform, fair performance criteria and tests and to avoid rigid, prescriptive criteria. Photovoltaics is an emerging technology; criteria written now must be able to accommodate devices and techniques not yet developed.

Not Available

1979-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Drinking Water Standards  

E-Print Network (OSTI)

This publication explains the federal safety standards for drinking water provided by public water supply systems. It discusses the legal requirements for public water supplies, the maximum level allowed for contaminants in the water, and the potential health effects of each contaminant regulated. People who use water from private sources such as wells can also use these standards as a guide in checking whether their water is safe.

Dozier, Monty; McFarland, Mark L.

2006-04-26T23:59:59.000Z

222

Market Requirements and Opportunities for Distributred Energy Storage Systems in the Commercial Sector  

Science Conference Proceedings (OSTI)

Energy storage systems sited at customer locations could enable and complement utility end-use efficiency programs. As a dispatchable resource, energy storage systems can provide utility distribution planners and grid operators with more certainty in terms of peak reduction, demand response, and load shifting. This research was conducted to identify and scope ideal energy storage systems configurations and cost requirements which best leverage utility end-use energy efficiency programs.

2008-12-08T23:59:59.000Z

223

Integration of Variable Generation Forecasting into System Operations: Current Practices and Future Requirements  

Science Conference Proceedings (OSTI)

This project update provides the first output of the EPRI Bulk Renewable Integration Program Project P173-010, “Integration of Variable Generation Forecasts into System Operations.” This project, begun in 2013, aims to improve existing methods utilities/independent system operators (ISOs) use to integrate forecasts into system operations and develop new methods. This year’s goal was to identify current practices and future requirements. This was done by interacting with a wide ...

2013-12-11T23:59:59.000Z

224

Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems  

Science Conference Proceedings (OSTI)

The objective of this study is to develop standardized air blown fixed bed gasification hot gas cleanup integrated gasifier combined cycle (IGCC) systems.

Sadowski, R.S.; Brown, M.J.; Hester, J.C.; Harriz, J.T.; Ritz, G.J.

1991-02-01T23:59:59.000Z

225

Implementing an integrated standards-based management system to ensure compliance at Los Alamos National Laboratory  

SciTech Connect

Los Alamos National Laboratory (LANL or the Laboratory) is developing and implementing a comprehensive, Integrated Standards-Based Management System (ISBMS) to enhance environmental, safety, and health (ESH) compliance efforts and streamline management of ESH throughout the Laboratory. The Laboratory recognizes that to be competitive in today`s business environment and attractive to potential Partnerships, Laboratory operations must be efficient and cost-effective. The Laboratory also realizes potential growth opportunities for developing ESH as a strength in providing new or improved services to its customers. Overall, the Laboratory desires to establish and build upon an ESH management system which ensures continuous improvement in protecting public health and safety and the environment and which fosters a working relationship with stakeholders. A team of process experts from the LANL Environmental Management (EM) Program Office, worked with management system consultants, and the Department of Energy (DOE) to develop an ESH management systems process to compare current LANL ESH management Systems and programs against leading industry standards. The process enabled the Laboratory to gauge its performance in each of the following areas: Planning and Policy Setting; Systems and Procedures; Implementation and Education; and Monitoring and Reporting. The information gathered on ESH management systems enabled LANL to pinpoint and prioritize opportunities for improvement in the provision of ESH services throughout the Laboratory and ultimately overall ESH compliance.

Hjeresen, D.; Roybal, S.; Bertino, P.; Gherman, C.; Hosteny, B.

1995-03-01T23:59:59.000Z

226

CERCLA reporting requirements, DOE occurrence reporting, and the DOE Emergency Management System. CERCLA Information Brief  

SciTech Connect

The Emergency Management System (EMS) provides a structure for reporting and processing operations information related to DOE owned/operated facilities. Hazardous Substance (HS) releases are subject to reporting requirements under the EMS as well as under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA requires reporting of HS releases into the environment in amounts greater than or equal to Reportable Quantities (RQs). This Information Brief elaborates on earlier CERCLA reporting and response process information Briefs by providing a general explanation of these CERCLA or EMS requirements, procedures, and events as they pertain to releases of HS`s at DOE facilities.

Dailey, R.

1993-10-01T23:59:59.000Z

227

Evaluating the Impact of Solar Generation on Balancing Requirements in Southern Nevada System  

Science Conference Proceedings (OSTI)

Abstract—In this paper, the impacts of solar photovoltaic (PV) generation on balancing requirements including regulation and load following in the Southern Nevada balancing area are analyzed. The methodology is based on the “swinging door” algorithm and a probability box method developed by PNNL. The regulation and load following signals are mimicking the system’s scheduling and real-time dispatch processes. Load, solar PV generation and distributed PV generation (DG) data are used in the simulation. Different levels of solar PV generation and DG penetration profiles are used in the study. Sensitivity of the regulation requirements with respect to real-time solar PV generation forecast errors is analyzed.

Ma, Jian; Lu, Shuai; Etingov, Pavel V.; Makarov, Yuri V.

2012-07-26T23:59:59.000Z

228

Maintaining Electrical System Reliability Under a Closed-Cycle Cooling Retrofit Requirement  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is investigating the implications of a potential U.S. Environmental Protection Agency (EPA) Clean Water Act 316(b) rulemaking that would establish "best technology available" (BTA) based on closed-cycle cooling retrofits for facilities with once-through cooling. This report focuses on the transmission system impacts that can potentially result from a requirement for use of closed-cycle cooling systems.

2011-07-20T23:59:59.000Z

229

ISO Standards Documents  

Science Conference Proceedings (OSTI)

ISO/TC 34: Food products and TC 34/SC 17: Management systems for food safety ISO Standards Documents iso3rss ISO Standards Development ISO Standards Development

230

Training Community College faculty in the techniques and skills required for Solar Energy System installation  

SciTech Connect

A project to train a specified number of community college, vocational/technical faculty in the techniques and skills required to install solar energy systems is described. The planning that led to the contract, the development and conduct of the training workshops, and the outcomes are detailed. An overall evaluation of the project and recommendations for the future are included. (MHR)

Leo, R.J.

1980-05-01T23:59:59.000Z

231

Exploring organizational expansion modes and their associated communication system requirements: consolidation and complementation  

Science Conference Proceedings (OSTI)

The expectation of firms following aggressive growth strategies is that firms expanding geographically will acquire extensive economic advantages unavailable to more conservative competitors. Growth-minded firms also believe that by integrating info-communication ... Keywords: Communication system requirements, Complementation, Consolidation, Organizational growth and expansion

J.Michael Tarn; H.Joseph Wen

2002-02-01T23:59:59.000Z

232

Functions and Requirements for the DST Knuckle Region Ultrasonic Scanning System  

Science Conference Proceedings (OSTI)

This document defines the functions and requirements for a ultrasonic scanning system to provide an examination of the knuckle region of Hanford's double shell waste tanks, This document provides the basis for the ultrasonic concept selection, design, fabrication, and deployment methodology.

Pardini, Allan F.; Samuel, Todd J.

2001-01-29T23:59:59.000Z

233

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 11, 0.11 Specialty systems  

SciTech Connect

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for canopies; loading dock systems; tanks; domes (bulk storage, metal framing); louvers & vents; access floors; integrated ceilings; and mezzanine structures.

Not Available

1993-05-01T23:59:59.000Z

234

DOE-STD-1170-2003; Electrical Systems Functional Area Qualification Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT MEASUREMENT SENSITIVE DOE-STD-1170-2003 December 2003 DOE STANDARD ELECTRICAL SYSTEMS FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-STD-1170-2003 This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-1170-2003

235

DOE-STD-1161-2003; Mechanical Systems Functional Area Qualification Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-2003 1-2003 June 2003 DOE STANDARD MECHANICAL SYSTEMS FUNCTIONAL AREA QUALIFICATION STANDARD DOE Defense Nuclear Facilities Technical Personnel U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-1161-2003 iii APPROVAL The Federal Technical Capability Panel consists of senior Department of Energy managers responsible

236

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State Wisconsin Program Type Interconnection Provider Public Service Commission of Wisconsin In February 2004, the Wisconsin Public Service Commission adopted interconnection standards for distributed generation (DG) systems up to 15 megawatts (MW) in capacity. All investor-owned utilities (IOUs) and municipal utilities are required to abide by the standard provisions.

237

Standard guide for mechanical drive systems for remote operation in hot cell facilities  

E-Print Network (OSTI)

1.1 Intent: 1.1.1 The intent of this standard is to provide general guidelines for the design, selection, quality assurance, installation, operation, and maintenance of mechanical drive systems used in remote hot cell environments. The term mechanical drive systems used herein, encompasses all individual components used for imparting motion to equipment systems, subsystems, assemblies, and other components. It also includes complete positioning systems and individual units that provide motive power and any position indicators necessary to monitor the motion. 1.2 Applicability: 1.2.1 This standard is intended to be applicable to equipment used under one or more of the following conditions: 1.2.1.1 The materials handled or processed constitute a significant radiation hazard to man or to the environment. 1.2.1.2 The equipment will generally be used over a long-term life cycle (for example, in excess of two years), but equipment intended for use over a shorter life cycle is not excluded. 1.2.1.3 The ...

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

238

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition  

DOE Green Energy (OSTI)

This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

Not Available

1985-01-01T23:59:59.000Z

239

Surrogate protein particle standards  

Science Conference Proceedings (OSTI)

... The large particles may be useful as a standard for the counting of ... drugs require visual inspection, at present there are no standards available for ...

2013-09-10T23:59:59.000Z

240

Appliance Efficiency Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Appliance Efficiency Standards Part 1 of 2 In the National Energy Policy Conservation Act (1978), Congress required DOE to set energy-efficiency standards for 13 residential...

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Blending of hydrogen in natural gas distribution systems. Volume I. Gas blends flow in distribution system, mixing points, and regulatory standards. Final report, June 1, 1976--August 30, 1977. [10 and 20% hydrogen  

DOE Green Energy (OSTI)

This volume of the subject study ''Blending of Hydrogen in Natural Gas Distribution Systems'' describes studies on the determination of gas distribution system flows with hydrogen - natural gas blends, potential hydrogen admission points to gas distribution systems, and the impact of hydrogen - natural gas blends on regulatory standards for gas distribution systems. The studies resulted in the following principal findings: (1) Most existing natural gas distribution systems could adequately transport 20% blends of hydrogen by volume with little or no modification. (2) The best point of admission of the hydrogen into a natural gas distribution system would be at the meter and regulating stations supplying a particular distribution system. (3) The impact of hydrogen - natural gas blends on state regulatory standards appears to be minimal for PSE and G, but requires further study for various National Codes and for other states.

None

1977-09-01T23:59:59.000Z

242

Standard-B auto grab sampler hydrogen monitoring system, Acceptance Test Report  

DOE Green Energy (OSTI)

Project W-369, Watch List Tank Hydrogen Monitors, installed a Standard-C Hydrogen Monitoring System (SHMS) on the Flammable gas waste tank AN-104. General Support Projects (8K510) was support by Test Engineering (7CH30) in the performance of the Acceptance Test Procedures (ATP) to qualify the SHMS cabinets on the waste tank. The ATP`s performance was controlled by Tank Farm work package. This completed ATP is transmitted by EDT-601748 as an Acceptance Test Report (ATR) in accordance with WHC-6-1, EP 4.2 and EP 1.12.

Lott, D.T.

1995-05-18T23:59:59.000Z

243

Recommendations to the NRC on acceptable standard format and content for the Fundamental Nuclear Material Control (FNMC) Plan required for low-enriched uranium enrichment facilities  

SciTech Connect

A new section, 10 CFR 74.33, has been added to the material control and accounting (MC A) requirements of 10 CFR Part 74. This new section pertains to US Nuclear Regulatory Commission (NRC)-licensed uranium enrichment facilities that are authorized to produce and to possess more than one effective kilogram of special nuclear material (SNM) of low strategic significance. The new section is patterned after 10 CFR 74.31, which pertains to NRC licensees (other than production or utilization facilities licensed pursuant to 10 CFR Part 50 and 70 and waste disposal facilities) that are authorized to possess and use more than one effective kilogram of unencapsulated SNM of low strategic significance. Because enrichment facilities have the potential capability of producing SNM of moderate strategic significance and also strategic SNM, certain performance objectives and MC A system capabilities are required in 10 CFR 74.33 that are not contained in 10 CFR 74.31. This document recommends to the NRC information that the licensee or applicant should provide in the fundamental nuclear material control (FNMC) plan. This document also describes methods that should be acceptable for compliance with the general performance objectives. While this document is intended to cover various uranium enrichment technologies, the primary focus at this time is gas centrifuge and gaseous diffusion.

Moran, B.W.; Belew, W.L. (Oak Ridge K-25 Site, TN (United States)); Hammond, G.A.; Brenner, L.M. (21st Century Industries, Inc., Gaithersburg, MD (United States))

1991-11-01T23:59:59.000Z

244

Examples of Smart Grid Standards  

Science Conference Proceedings (OSTI)

... Examples of Smart Grid Standards. Hundreds of standards will be required for an efficient and effective smart grid. Historically ...

2013-05-09T23:59:59.000Z

245

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

246

Oncor Electric Delivery - Solar Photovoltaic Standard Offer Program...  

Open Energy Info (EERE)

be certified to UL-1703 standards Start Date 06062011 Installation Requirements All solar photovoltaic system installations must obtain appropriate local building permits and...

247

City of San Jose - Photovoltaic Permit Requirements (California...  

Open Energy Info (EERE)

Jose - Solar Hot Water Heaters & Photovoltaic Systems Permit Requirements Incentive Type SolarWind Permitting Standards Applicable Sector Commercial, Construction, Industrial,...

248

Program on Technology Innovation: Probabilistic Risk Assessment Requirements for Passive Safety Systems  

Science Conference Proceedings (OSTI)

A key feature of the next generation of nuclear power reactors is a reliance on safety systems that are passive, that is, those that rely on natural physical laws and require minimal or no intervention by plant operators. These features are intended to significantly reduce the potential for serious events while simultaneously minimizing facility life-cycle costs. In addition to these features, these reactors will be licensed within a framework that will be risk-informed and performance-based. Because pro...

2007-12-20T23:59:59.000Z

249

Program on Technology Innovation: Comprehensive Risk Assessment Requirements for Passive Safety Systems  

Science Conference Proceedings (OSTI)

A key feature of the forthcoming generation of nuclear power reactors will be reliance on passive safety systems (PSSs)those that rely on natural physical laws and require minimal or no intervention by plant operators. In 2007, preliminary findings summarized the current state of research into tools and methods that are capable of supporting probabilistic risk assessments (PRAs) for PSSs. These results and a recommended research plan for addressing the identified issues are presented in the Electric Powe...

2008-12-23T23:59:59.000Z

250

System Energy Assessment (SEA), Defining a Standard Measure of EROI for Energy Businesses as Whole Systems  

E-Print Network (OSTI)

A more objective method for measuring the energy needs of businesses, System Energy Assessment (SEA), identifies the natural boundaries of businesses as self-managing net-energy systems, of controlled and self-managing parts. The method is demonstrated using a model Wind Farm case study, and applied to defining a true physical measure of its energy productivity for society (EROI-S), the global ratio of energy produced to energy cost. The traceable needs of business technology are combined with assignable energy needs for all other operating services. That serves to correct a large natural gap in energy use information. Current methods count traceable energy receipts for technology use. Self-managing services employed by businesses outsource their own energy needs to operate, and leave no records to trace. Those uncounted energy demands are often 80% of the total embodied energy of business end products. The scale of this "dark energy" was discovered from differing global accounts, and corrected so the average...

Henshaw, Philip F; Zarnikau, Jay

2011-01-01T23:59:59.000Z

251

Energy Efficiency Resource Standard | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Resource Standard Efficiency Resource Standard Energy Efficiency Resource Standard < Back Eligibility Investor-Owned Utility Utility Program Info State Rhode Island Program Type Energy Efficiency Resource Standard Provider Rhode Island Public Utilities Commission Rhode Island enacted legislation in 2006 requiring the state Public Utilities Commission (PUC) to establish standards for system reliability, energy efficiency and conservation procurement, including standards for energy supply diversification, distributed generation, demand response, and "prudent and reliable" energy efficiency and energy conservation measures. These standards and guidelines, which were adopted by the PUC in 2008, must be reviewed at least once every three years. Each electric and natural gas

252

How Much Multiuser Diversity is Required for Energy Limited Multiuser Systems?  

E-Print Network (OSTI)

Multiuser diversity (MUDiv) is one of the central concepts in multiuser (MU) systems. In particular, MUDiv allows for scheduling among users in order to eliminate the negative effects of unfavorable channel fading conditions of some users on the system performance. Scheduling, however, consumes energy (e.g., for making users' channel state information available to the scheduler). This extra usage of energy, which could potentially be used for data transmission, can be very wasteful, especially if the number of users is large. In this paper, we answer the question of how much MUDiv is required for energy limited MU systems. Focusing on uplink MU wireless systems, we develop MU scheduling algorithms which aim at maximizing the MUDiv gain. Toward this end, we introduce a new realistic energy model which accounts for scheduling energy and describes the distribution of the total energy between scheduling and data transmission stages. Using the fact that such energy distribution can be controlled by varying the num...

Ko, Youngwook; Ardakani, Masoud

2010-01-01T23:59:59.000Z

253

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation  

Science Conference Proceedings (OSTI)

This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This manual covers an array of modules written for the SCALE package, consisting of drivers, system libraries, cross section and materials properties libraries, input/output routines, storage modules, and help files.

NONE

1997-03-01T23:59:59.000Z

254

Summary of collaborative photovoltaic industry work to proactively improve codes and standards for photovoltaic power system applications  

SciTech Connect

Several important milestones in codes and standards pertaining to the design, installation and operation of photovoltaic (PV) systems have recently been completed with collaboration of participants from all sectors of the PV industry, utilities and the US Department of Energy`s National Photovoltaic Program. Codes and standards that have been proposed, written or modified include changes and additions for the 1999 National Electrical Code{reg_sign} (NEC{reg_sign}), standards for fire and personnel safety, system testing, component qualification, and utility interconnect. Project authorization requests with the Institute of Electrical and Electronic Engineers (IEEE) have resulted in standards for listing PV modules and balance-of-system components. Industry collaboration with Underwriter Laboratories, Inc. (UL), with the American Society for Testing and Materials (ASTM), and through critical input and review for international standards with the International Electrotechnical Commission (IEC) have resulted in domestic and international standards for PV. Work related to the codes and standards activities through the International Energy Agency (IEA) is also being supported by the PV industry and the US DOE. This paper will concentrate on and summarize the important new NEC proposals for PV systems and will also describe and show the bonds between the activities in other standards writing activities. The paper will also provide an analysis of changes and resulting impacts of selected proposed NEC changes on PV designs, installations and performance.

Bower, W.I.

1997-08-01T23:59:59.000Z

255

Development of Standardized Power Electronic Components, Subsystems, and Systems for Increased Modularity and Scalability  

SciTech Connect

Power electronics devices hold substantial promise for making distributed energy applications more efficient and cost effective. This project is motivated towards developing and testing inverters that will allow distributed energy systems to provide ancillary services such as voltage and VAR regulation, and increased grid reliability by seamlessly transitioning between grid-tied and stand-alone operation modes. The objectives of this project are to identify system integration and optimization issues and technologies and to provide solutions through research, analysis, and testing of power electronic interfaces for distributed energy applications that are cost-competitive and have substantially faster response times than conventional technologies. In addition, the testing of power electronics interfaces will develop a technical basis for performance assessment for distributed energy systems, subsystems, and components that will finally create a foundation for standardized measurements and test procedures. The ultimate goal for this research is to advance the potential benefits of distributed energy to provide ancillary services, enhance power system reliability, and allow customer choice.

Chakraborty, S.; Pink, C.; Price, J.; Kroposki, B.; Kern, G.

2007-11-01T23:59:59.000Z

256

UML 2.0 and agents: how to build agent-based systems with the new UML standard  

Science Conference Proceedings (OSTI)

Unified Modeling Language (UML 2.0) is the upcoming standard of the Object Management Group for specifying object-oriented software systems. In this paper, we will show how UML 2.0 can be applied for the specification of agent-based systems. Moreover, ... Keywords: Agent-based systems, Agent-oriented software engineering, UML 2.0

Bernhard Bauer; James Odell

2005-03-01T23:59:59.000Z

257

Monitoring System Performance (Presentation)  

DOE Green Energy (OSTI)

Requirements for a standard test to rate the durability of photovoltaic (PV) modules at system voltage are discussed.

Emery, K.; Smith, R.

2011-02-01T23:59:59.000Z

258

General technical requirements (GTR) for inventory monitoring systems (IMS) for the trilateral initiative  

Science Conference Proceedings (OSTI)

Pursuant to the Trilateral Initiative, the three parties (The Russian Federation, the United States, and the International Atomic Energy Agency) have been engaged in discussions concerning the structure of reliable monitoring systems for storage facilities having large inventories. The intent of these monitoring systems is to provide the capability for the IAEA to maintain continuity of knowledge in a sufficiently reliable manner that should there be equipment failure, loss of continuity of knowledge would be restricted to a small population of the inventory, and thus reinventory of the stored items would be minimized These facility-specific monitoring systems, referred to as Inventory Monitoring Systems (IMS) are to provide the principal means for the M A to assure that the containers of fissile material remain accounted under the Verification Agreements which are to be concluded between the IAEA and the Russian Federation and the lAEA and the United States for the verification of weapon-origin and other fissile material specified by each State as released from its defense programs. A technical experts working group for inventory monitoring systems has been meeting since Feb- of 2000 to formulate General Technical Requirements (GTR) for Inventory Monitoring Systems for the Trilateral Initiative. Although provisional agreement has been reached by the three parties concerning the GTR, it is considered a living document that can be updated as warranted by the three parties. This paper provides a summary of the GTR as it currently exists.

Pshakin, Gennady M.; Kuleshov, I. (Igor); Shea, T.; Puckett, J. M. (John M.); Zhukov, I.; Mangan, Dennis L.; Matter, John C.; Waddoups, I. (Ivan); Smathers, D. (Douglas); Abhold, M. E. (Mark E.); Hsue, S.-T. (Sin-Tao); Chiaro, P. (Peter)

2002-01-01T23:59:59.000Z

259

Addressing System Integration Issues Required for the Developmente of Distributed Wind-Hydrogen Energy Systems: Final Report  

DOE Green Energy (OSTI)

Wind generated electricity is a variable resource. Hydrogen can be generated as an energy storage media, but is costly. Advancements in power electronics and system integration are needed to make a viable system. Therefore, the long-term goal of the efforts at the University of North Dakota is to merge wind energy, hydrogen production, and fuel cells to bring emission-free and reliable power to commercial viability. The primary goals include 1) expand system models as a tool to investigate integration and control issues, 2) examine long-term effects of wind-electrolysis performance from a systematic perspective, and 3) collaborate with NREL and industrial partners to design, integrate, and quantify system improvements by implementing a single power electronics package to interface wild AC to PEM stack DC requirements. This report summarizes the accomplishments made during this project.

Mann, M.D; Salehfar, H.; Harrison, K.W.; Dale, N.; Biaku, C.; Peters, A.J.; Hernandez-Pacheco: E.

2008-04-01T23:59:59.000Z

260

Synchrophasor Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development & Support Development & Support Kenneth Martin martin@electricpowergroup.com June 27-28, 2013 Washington, DC DOE/OE Transmission Reliability Program 2 Introduction  Synchrophasor measurement systems widely deployed  Enable a new generation of power system monitor & control capability - Improved power system analysis & system models - Wide area, high-resolution visibility - Basis for a new generation of controls  Research challenge - standards to enable interoperability - Measurement performance - Communications  Research focus - facilitate development, testing, and validation of standards to promote interoperability Basic phasor concept well known . A phasor is the complex form of the AC waveform √2 A cos (2 π ω 0 t + φ) A e

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

HEPA Filter Differential Pressure Fan Interlock System Functional Requirements and Technical Design Criteria  

SciTech Connect

Double-shell tanks (DSTs) and Double Contained Receiver Tanks (DCRTs) are actively ventilated, along with certain single-shell tanks (SSTs) and other RPP facilities. The exhaust air stream on a typical primary ventilation system is drawn through two stages of high-efficiency particulate air (HEPA) filtration to ensure confinement of airborne radioactive materials. Active ventilation exhaust stacks require a stack CAM interlock to detect releases from postulated accidents, and to shut down the exhaust fan when high radiation levels are detected in the stack airstream. The stack CAM interlock is credited as a mitigating control to stop continued unfiltered radiological and toxicological discharges from the stack, which may result from an accident involving failure of a HEPA filter. This document defines the initial technical design baseline for a HEPA filter AP fan interlock system.

TUCK, J.A.

2000-05-11T23:59:59.000Z

262

Grid Information Security Functional Requirement - Fulfilling Information Security of a Smart Grid System  

E-Print Network (OSTI)

This paper describes the background of smart information infrastructure and the needs for smart grid information security. It introduces the conceptual analysis to the methodology with the application of hermeneutic circle and information security functional requirement identification. Information security for the grid market cover matters includes automation and communications industry that affects the operation of electric power systems and the functioning of the utilities that manage them and its awareness of this information infrastructure has become critical to the reliability of the power system. Community benefits from of cost savings, flexibility and deployment along with the establishment of wireless communications. However, concern revolves around the security protections for easily accessible devices such as the smart meter and the related communications hardware. On the other hand, the changing points between traditional versus smart grid networking trend and the information security importance on...

Ling, Amy Poh Ai; 10.5121/ijgca.2011.2201

2011-01-01T23:59:59.000Z

263

Standards and Certification  

Science Conference Proceedings (OSTI)

... Standards and Certification. Voluntary Voting System Guidelines (VVSG). The Help America Vote Act instructed the Election ...

2013-09-17T23:59:59.000Z

264

CGI-844: 100-K coolant back-up system scope requirements  

SciTech Connect

Several decisions regarding basic project philosophy must be made in order to proceed with scope design and the preparation of equipment procurement specifcations. The purpose of this document is to present as much pertinent data as possible to allow the project representatives to become familiar with the problems involved. A meeting of Representatives is planned for the near future after receipt of project authorization to discuss the scope of this project and its relationship to CG-775. Emergency flow requirements of the K reactors for planned future power levels is approximately 32,000 gpm within 68 sec. A detailed study of the existing high-pressure cross-tie line reveals that a duplicate cross-tie line and five low lift pump operation would be required to provide this flow. The existing emergency generation capacity is not adequate to supply five low lift pumps and all other necessary emergency electrical loads. A possible solution to adequate emergency flows is to connect the proposed steam turbine pump directly to the risers and to consider the turbine pump as the last ditch system. If it is determined that this does not meet the criteria of separate systems, then an alternate solution must be found.

Watson, D.F.

1959-07-28T23:59:59.000Z

265

Design requirements document for the phase 1 privatization electrical power system  

Science Conference Proceedings (OSTI)

The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

Singh, G.

1997-10-31T23:59:59.000Z

266

SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 1. System requirement definition and system analysis  

Science Conference Proceedings (OSTI)

Catalytic Inc. was awarded a contract to conduct a preliminary system design and cost analysis for a brackish water desalination project to be located in Brownsville, Texas. System analyses and economic analyses were performed to define the baseline solar energy desalination system. The baseline system provides an average daily product water capacity of 6000 mT. The baseline system is optimal relative to technological risk, performance, and product water cost. Subsystems and their interfaces have been defined and product water cost projections made for commercial plants in a range of capacities. Science Applications, Inc. (SAI), subcontractor to Catalytic, had responsibility for the solar power system. This, the final report, summarizes the work performed under the Phase I effort.

Not Available

1986-01-01T23:59:59.000Z

267

The standard Instrumentation Feedthrough System for the LHC cryo-magnets  

E-Print Network (OSTI)

For the LHC, 1232 dipole magnets and about 400 quadrupole magnets operating at 1.9 K are installed in arcs and dispersion suppressors. Each cryo-magnet assembly comprises the main magnet and several small corrector magnets. Each assembly is equipped with voltage taps, quench heaters and cryogenic instrumentation. The number of instrumentation wires serving each magnet assembly and passing from cold to ambient is between 36 and 40. An Instrumentation Feedthrough System (IFS) will electrically and mechanically connect the instrument wires to the outside of the vacuum vessel. The IFS has to satisfy several requirements: simplicity of integration, optimal access during tests and commissioning, voltage withstand and reliability during the lifetime of the machine. The heat load to superfluid helium must be minimized, and the long-term stability of the insulation vacuum should be preserved. The solution foresees an open stainless steel tube housing the wires connected between the magnet and the outside of the vacuum...

Bozzini, D

2002-01-01T23:59:59.000Z

268

Interface Width and Bulk Stability: requirements for the simulation of Deeply Quenched Liquid-Gas Systems  

E-Print Network (OSTI)

Simulations of liquid-gas systems with extended interfaces are observed to fail to give accurate results for two reasons: the interface can get ``stuck'' on the lattice or a density overshoot develops around the interface. In the first case the bulk densities can take a range of values, dependent on the initial conditions. In the second case inaccurate bulk densities are found. In this communication we derive the minimum interface width required for the accurate simulation of liquid gas systems with a diffuse interface. We demonstrate this criterion for lattice Boltzmann simulations of a van der Waals gas. When combining this criterion with predictions for the bulk stability we can predict the parameter range that leads to stable and accurate simulation results. This allows us to identify parameter ranges leading to high density ratios of over 1000. This is despite the fact that lattice Boltzmann simulations of liquid-gas systems were believed to be restricted to modest density ratios of less than 20.

A. J. Wagner; C. M. Pooley

2007-06-11T23:59:59.000Z

269

File System Monitoring as a Window Into User I/O Requirements  

E-Print Network (OSTI)

As part of the 2008-2009 upgrade of the Franklin Cray XT at the National Energy Research Scientific Computing center, its I/O resources were more than doubled. The extra bandwidth reduced contention for I/O resources and those resources were split into two file systems, /scratch and /scratch2, each with more bandwidth than the original /scratch. In an effort to improve responsiveness, NERSC consulting encouraged ”big I/O ” jobs to use /scratch2. File system monitoring data indicate that this division of the NERSC workload has been largely successful, and we present several useful characterizations of the two I/O workloads that resulted. This feedback for both the users and the center enhances NERSC’s ability to manage and provision Franklin’s I/O subsytem as well as to plan for future I/O requirements. The workload characterization presented here also lays the groundwork for the development of a rigorous methodology for measuring the impact of I/O on system utilization, which we outline in Future Work.

Andrew Uselton; Katie Antypas; Daniela Ushizima; Jeffrey Sukharev

2010-01-01T23:59:59.000Z

270

Alternatives generation and analysis for the Phase I intermediate waste feed staging system design requirements  

SciTech Connect

This alternatives generation and analysis (AGA) addresses the question: What is the design basis for the facilities required to stage low-level waste (LLW) feed to the Phase I private contractors? Alternative designs for the intermediate waste feed staging system were developed, analyzed, and compared. Based on these analyses, this document recommends installing mixer pumps in the central pump pit of double-shell tanks 241-AP-102 and 241-AP-104. Also recommended is installing decant/transfer pumps at these tanks. These recommendations have clear advantages in that they provide a low shedule impact/risk and the highest operability of all the alternatives investigated. This revision incorporates comments from the decision board.

Claghorn, R.D., Fluor Daniel Hanford

1997-02-06T23:59:59.000Z

271

Towards pre-standardization of trust and reputation models for distributed and heterogeneous systems  

Science Conference Proceedings (OSTI)

Different trust and/or reputation models have arisen in the last few years. All of them have certain key processes in common such as scoring, ranking, rewarding, punishing or gathering behavioral information. However, there is not a standardization effort ... Keywords: Trust and reputation management, Trust and reputation models taxonomy, Trust and reputation standardization

Félix Gómez Mármol; Gregorio Martínez Pérez

2010-06-01T23:59:59.000Z

272

Standard Guide for On-Site Inspection and Verification of Operation of Solar Domestic Hot Water Systems  

E-Print Network (OSTI)

1.1 This guide covers procedures and test methods for conducting an on-site inspection and acceptance test of an installed domestic hot water system (DHW) using flat plate, concentrating-type collectors or tank absorber systems. 1.2 It is intended as a simple and economical acceptance test to be performed by the system installer or an independent tester to verify that critical components of the system are functioning and to acquire baseline data reflecting overall short term system heat output. 1.3 This guide is not intended to generate accurate measurements of system performance (see ASHRAE standard 95-1981 for a laboratory test) or thermal efficiency. 1.4 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only. 1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine th...

American Society for Testing and Materials. Philadelphia

1987-01-01T23:59:59.000Z

273

DOE Technical Standards Program Standards Actions Newsletter  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* * New DOE Standard, Communicating Waste Characterization and DOT Hazard Classification Requirements * Workshops and Events * The Annual Energy Facility Contractors Group Safety Analysis Workshop * 2012 Chemical Safety and Life Cycle Management Workshop * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE April 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ New DOE Standard, Communicating Waste Characterization and DOT Hazard Classification Requirements The Department of Energy (DOE) Office of Environmental Management (EM) has a challenging mission to solve many problems posed by the legacy of the Cold War, including the transportation of unprecedented amounts of contaminated waste,

274

Safety Issues and Approach to Meet the Safety Requirements in Tokamak Cooling Water System of ITER  

Science Conference Proceedings (OSTI)

The ITER (Latin for 'the way') tokamak cooling water system (TCWS) consists of several separate systems to cool the major ITER components - the divertor/limiter, the first wall blanket, the neutral beam injector and the vacuum vessel. The ex-vessel part of the TCWS systems provides a confinement function for tritium and activated corrosion products in the cooling water. The Vacuum Vessel System also has a functional safety requirement regarding the residual heat removal from in-vessel components. A preliminary hazards assessment (PHA) was performed for a better understanding of the hazards, initiating events, and defense in depth mechanisms associated with the TCWS. The PHA was completed using the following steps. (1) Hazard Identification. Hazards associated with the TCWS were identified including radiological/chemical/electromagnetic hazards and physical hazards (e.g., high voltage, high pressure, high temperature, falling objects). (2) Hazard Categorization. Hazards identified in step (1) were categorized as to their potential for harm to the workers, the public, and/or the environment. (3) Hazard Evaluation. The design was examined to determine initiating events that might occur and that could expose the public, environment, or workers to the hazard. In addition the system was examined to identify barriers that prevent exposure. Finally, consequences to the public or workers were qualitatively assessed, should the initiating event occur and one or more of the barriers fail. Frequency of occurrence of the initiating event and subsequent barrier failure was qualitatively estimated. (4) Accident Analysis. A preliminary hazards analysis was performed on the conceptual design of the TCWS. As the design progresses, a detailed accident analysis will be performed in the form of a failure modes and effects analysis. The results of the PHA indicated that the principal hazards associated with the TCWS were those associated with radiation. These were low compared to hazards associated with nuclear fission reactors and were limited to potential exposure to the on-site workers if appropriate protective actions were not used. However, the risk to the general public off-site was found to be negligible even under worst case accident conditions.

Flanagan, George F [ORNL; Reyes, Susana [ITER Organization, Saint Paul Lez Durance, France; Chang, Keun Pack [ITER Organization, Saint Paul Lez Durance, France; Berry, Jan [ORNL; Kim, Seokho H [ORNL

2010-01-01T23:59:59.000Z

275

Ventilation rates calculated from hydrogen release data in tanks equipped with standard hydrogen monitoring systems (SHMS)  

DOE Green Energy (OSTI)

This report describes a method for estimating the ventilation rates of the high-level radioactive waste tank headspaces at the Hanford Site in Southeastern Washington state. The method, using hydrogen concentration data, is applied to all passively ventilated and selected mechanically ventilated tanks equipped with Standard Hydrogen Monitoring Systems (SHMS) and covers the time period from when the SHMS were installed through July 12, 1998. Results of the analyses are tabulated and compared with results from tracer gas studies and similar analyses of SHMS data. The method relies on instances of above-normal hydrogen releases and assumes the rate at which hydrogen is released by the waste is otherwise approximately constant. It also assumes that hydrogen is uniformly distributed in the tank headspace, so that at any given time the concentration of hydrogen in the effluent is approximately equal to the average headspace concentration and that measured by the SHMS. In general, the greatest single source of error in the method is the determination of the baseline hydrogen concentration, which in this study has been estimated by visual inspection of plotted data. Uncertainties in the calculated ventilation rates due to inaccurate baseline measurements are examined by performing a sensitivity analysis with upper and lower bounding values for the baseline concentration (in addition to the best estimate). A table lists the tanks considered in this report and the range of estimated ventilation rates obtained for each tank. When multiple events of above-normal hydrogen releases were observed, the range of estimated ventilation rates is given. Resulting values and their variability are consistent with those determined using tracer gases.

Sklarew, D.S.; Huckaby, J.L.

1998-09-01T23:59:59.000Z

276

Fume Hoods Standards and Practices Laboratory exhaust ventilation systems designed, constructed, maintained, and used at Cal  

E-Print Network (OSTI)

for capturing discharges from gas chromatographs, pipe nipples or the end of tubing. However, the effectiveness. National Fire Protection Association (NFPA) Handbook 45, Standard on Fire Protection for Laboratories Using

de Lijser, Peter

277

Guidelines for Implementing Substation Automation Using IEC61850, the International Power System Information Modeling Standard  

Science Conference Proceedings (OSTI)

This report provides guidelines for substation planners, project managers, substation engineers, information technologists, and substation integrators on informational issues related to substation automation (SA) when IEC61850 standards are used.

2004-12-22T23:59:59.000Z

278

Proposed Reference Spectral Irradiance Standards to Improve Photovoltaic Concentrating System Design and Performance Evaluation: Preprint  

Science Conference Proceedings (OSTI)

This conference paper describes the American Society for Testing and Materials (ASTM), the International Electrotechnical Commission (IEC), and the International Standards Organization (ISO) standard solar terrestrial spectra (ASTM G-159, IEC-904-3, ISO 9845-1) provide standard spectra for photovoltaic performance applications. Modern terrestrial spectral radiation models and knowledge of atmospheric physics are applied to develop suggested revisions to update the reference spectra. We use a moderately complex radiative transfer model (SMARTS2) to produce the revised spectra. SMARTS2 has been validated against the complex MODTRAN radiative transfer code and spectral measurements. The model is proposed as an adjunct standard to reproduce the reference spectra. The proposed spectra represent typical clear sky spectral conditions associated with sites representing reasonable photovoltaic energy production and weathering and durability climates. The proposed spectra are under consideration by ASTM.

Myers, D. R.; Emery, K. E.; Gueymard, C.

2002-05-01T23:59:59.000Z

279

Restoring Faith in the bulk-power system: an early assessment of mandatory reliability standards  

SciTech Connect

The driving force underlying creation of mandatory reliability standards was the prevention of widespread outages, such as those that occurred in 1965, 1977 and 2003. So far, no similar outage has occurred when an entity is in full compliance with the standards, and NERC and FERC have demonstrated that they will actively enforce compliance while aggressively pursuing entities alleged to be non-compliant. (author)

McAllister, Levi; Dawson, Kelly L.

2010-03-15T23:59:59.000Z

280

Comparison between predicted duct effectiveness from proposed ASHRAE Standard 152P and measured field data for residential forced air cooling systems  

E-Print Network (OSTI)

for Forced Air Systems in Proposed ASHRAE Standard 152P.ASHRAE Transactions, 104(1B), 1360-1375. Walker I, ShermanDuct Effectiveness from Proposed ASHRAE Standard 152P and

Siegel, Jeffrey A.; McWilliams, Jennifer A.; Walker, Iain S.

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Tethys: The Marine and Hydrokinetic Technology Environmental Impacts Knowledge Management System -- Requirements Specification -- Version 1.0  

SciTech Connect

The marine and hydrokinetic (MHK) environmental impacts knowledge management system (KMS), dubbed Tethys after the mythical Greek goddess of the seas, is being developed for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy Wind and Hydropower Technologies Program (WHTP) by Pacific Northwest National Laboratory (PNNL). This requirements specification establishes the essential capabilities required of Tethys and clarifies for WHTP and the Tethys development team the results that must be achieved by the system.

Butner, R. Scott; Snowden-Swan, Lesley J.; Ellis, Peter C.

2010-11-09T23:59:59.000Z

282

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Biofuels Alternative Fuel Vehicles Commercial Heating & Cooling Manufacturing Buying & Making Electricity Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State New Hampshire Program Type Interconnection Provider New Hampshire Public Utilities Commission New Hampshire requires all utilities selling electricity in the state to offer net metering to customers who own or operate systems up to one megawatt (1 MW) in capacity that generate electricity using solar, wind, geothermal, hydro, tidal, wave, biomass, landfill gas, bio-oil or

283

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

284

Environmental Disclosure Requirements by State … August 2002  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Disclosure Requirements by State - August 2002 Environmental Disclosure Requirements by State - August 2002 State Disclosure Requirement Scope Frequency Distribution Effective Date Authority Legislation/ Regulation Verification Requirement Notes Full Disclosure Requirements Arkansas Standards to be set for disclosure of environmental impacts Electric service providers TBD TBD TBD Legislature 1999 Act 1556; Rules not yet developed TBD Restructuring delayed until 2003. California Fuel mix required in standard format. Electric service providers Quarterly Bill insert, offers, and written promotional materials (except ads) 1999 Legislature Title 20, Article 5, California Code of Regulation Report to Commission annually with supporting documentation. Suppliers not making specific claims may disclose system mix. Colorado Fuel mix. Standard format is suggested.

285

SCR SYSTEMS FOR HEAVY DUTY TRUCKS: PROGRESS TOWARDS MEETING EURO 4 EMISSION STANDARDS IN 2005  

DOE Green Energy (OSTI)

Emissions of diesel engines contain some components, which support the generation of smog and which are classified hazardous. Exhaust gas aftertreatment is a powerful tool to reduce the NOx and Particulate emissions. The NOx-emission can be reduced by the SCR technology. SCR stands for Selective Catalytic Reduction. A reduction agent has to be injected into the exhaust upstream of a catalyst. On the catalyst the NOx is reduced to N2 (Nitrogen) and H2O (Water). This catalytic process was developed in Japan about 30 years ago to reduce the NOx emission of coal-fired power plants. The first reduction agent used was anhydrous ammonia (NH3). SCR technology was used with diesel engines starting mid of the 80s. First applications were stationary operating generator-sets. In 1991 a joint development between DaimlerChrysler, MAN, IVECO and Siemens was started to use SCR technology for the reduction of heavy duty trucks. Several fleet tests demonstrated the durability of the systems. To day, SCR technology is the most promising technology to fulfill the new European Regulations EURO 4 and EURO 5 being effective Oct. 2005 and Oct. 2008. The efficient NOx reduction of the catalyst allows an engine calibration for low fuel consumption. DaimlerChrysler decided to use the SCR technology on every heavy duty truck and bus in Europe and many other truck manufacturers will introduce SCR technology to fulfill the 2005 emission regulation. The truck manufacturers in Europe agreed to use aqueous solution of Urea as reducing agent. The product is called AdBlue. AdBlue is a non toxic, non smelling liquid. The consumption is about 5% of the diesel fuel consumption to reduce the NOx emissions. A small AdBlue tank has to be installed to the vehicle. With an electronically controlled dosing system the AdBlue is injected into the exhaust. The dosing system is simple and durable. It has proven its durability during winter and summer testing as well as in fleet tests. The infrastructure for AdBlue is under evaluation in Europe by Urea Producers and Mineral Oil companies to be readily available in time. Urea is one of the most common chemical products in the world and the production and the distribution very much experienced. However, a pure grade is needed for automotive application and requires special attention.

Frank, W; Huethwohl, G; Maurer, B

2003-08-24T23:59:59.000Z

286

Vehicle fuel economy benefit and aftertreatment requirement of an HCCI-SI engine system.  

E-Print Network (OSTI)

??This body of work dimensions the HCCI fuel economy benefits and required aftertreatment performance for compliance with emissions regulations in North America and Europe. The… (more)

Hardy, AliciA Jillian Jackson, 1978-

2007-01-01T23:59:59.000Z

287

Creating and Implementing a Regularized Monitoring and EnforcementSystem for China's Mandatory Standards and Energy Information Label forAppliances  

SciTech Connect

China has developed a comprehensive program of energy efficiency standards and labels for household appliances. In 1989, China first launched its minimum energy performance standards (MEPS), which are now applied to an extensive list of products. In 1998, China launched a voluntary energy endorsement label, which has grown to cover both energy-saving and water-saving products. And, in 2005, China launched a mandatory energy information label that initially covered two products. CLASP has assisted China in developing 11 minimum energy performance standards (MEPS) for 9 products and endorsement labels for 11 products including: refrigerators; air conditioners; televisions; printers; computers; monitors; fax machines; copiers; DVD/VCD players; external power supplies; and set-top boxes. CLASP has also assisted China in the development of the mandatory energy information label. Increasingly, attention is being placed on maximum energy savings from China's standards and labeling (S&L) efforts in order to meet the recently announced goal of reducing China's energy intensity by 20 percent by 2010 with an interim objective of 4 percent in 2006. China's mandatory standards system is heavily focused on the technical requirements for efficiency performance, but historically, it has lacked administrative and personnel capacity to undertake monitoring and enforcement of these legally binding standards. Similarly, resources for monitoring and enforcement have been quite limited. As a consequence, compliance to both the mandatory standards and the mandatory energy information label is uneven with the potential and likely result of lost energy savings. Thus, a major area for improvement, which could significantly increase overall energy savings, is the creation and implementation of a regularized monitoring system for tracking the compliance to, and enforcement of, mandatory standards and the energy information label in China. CLASP has been working with the China National Institute of Standardization (CNIS), the China Administration for Quality, Supervision, Inspection and Quarantine (AQSIQ) and relevant stakeholders in the industry to develop a stronger system of monitoring and enforcement. In November 2005, CNIS and LBNL (a CLASP implementing partner) with funding from the Energy Foundation jointly organized an international workshop to present the international best practices in S&L monitoring and enforcement. Currently, CNIS is developing a guideline for monitoring and enforcement for appliance standards. With support from METI, CLASP has been able to expand the on-going collaboration with CNIS to include enforcement needs for the mandatory energy information label and to accelerate the progress of the project to develop a more robust monitoring and enforcement for S&L programs in China. This expanded effort has included: (1) Holding an enforcement and monitoring roadmap planning workshop with key S&L stakeholders; (2) Interviews with S&L stakeholders on the need and scope of national compliance tests; (3) Research on past enforcement activities; (4) An analysis of compliance data from the mandatory energy information labeling program; (5) Interviews with stakeholders on the need and scope of testing infrastructure; and (6) Development of a roadmap for future activities. This report summarizes the findings of these activities and identifies the progress that China is making, and can make, toward developing a stronger system of monitoring and enforcement (M&E). In sum, it outlines a vision of moving forward with more vigorous M&E in China.

Lin, Jiang

2007-03-01T23:59:59.000Z

288

Columbia- Renewables Portfolio Standard  

Energy.gov (U.S. Department of Energy (DOE))

In November 2004, voters in Columbia, Missouri approved a proposal to adopt a local renewables portfolio standard (RPS).* The initiative requires the city's municipal utility, Columbia Water &...

289

Vacuum Comparison Standard  

Science Conference Proceedings (OSTI)

... Manometers (UIMs), which are primary standards with the lowest stated uncertainty in the world, but require significant time and money to operate. ...

2012-11-16T23:59:59.000Z

290

Alternative Energy Portfolio Standard  

Energy.gov (U.S. Department of Energy (DOE))

Pennsylvania's Alternative Energy Portfolio Standard (AEPS), created by S.B. 1030 on November 30, 2004, requires each electric distribution company (EDC) and electric generation supplier (EGS) to...

291

Seminars on Science: Correlation to the National Science Education Content Standards Systems, order, and organization.  

E-Print Network (OSTI)

Seminars on Science: Correlation to the National Science Education Content Standards Evolution Understanding about science and technology Personal and community health Population growth Natural resources Environmental quality Natural and human-induced hazards Science and technology in local, national, and global

292

Safety Standards  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US DOE Workshop US DOE Workshop September 19-20, 2012 International perspective on Fukushima accident Miroslav Lipár Head, Operational Safety Section M.Lipar@iaea.org +43 1 2600 22691 2 Content * The IAEA before Fukushima -Severe accidents management * The IAEA actions after Fukushima * The IAEA Action plan on nuclear safety * Measures to improve operational safety * Conclusions THE IAEA BEFORE FUKUSHIMA 4 IAEA Safety Standards IAEA Safety Standards F undamental S afety Principles Safety Fundamentals f o r p ro te c ti n g p e o p l e a n d t h e e n v i ro n m e n t IAEA Safety Standards Regulations for the Safe Transport of Radioactive Material 2005 E dit ion Safety Requirements No. T S-R-1 f o r p ro te c ti n g p e o p l e a n d t h e e n v i ro n m e n t IAEA Safety Standards Design of the Reactor Core for Nuclear Power Plants

293

Sensitivity analysis of mobile home space conditioning energy requirements to selection of U-values in twelve climates and cost/benefit analysis of U-values proposed for the federal manufactured housing construction (FMHC) and safety standards (SS)  

SciTech Connect

This study determines the sensitivity of four suggested and existing building thermal performance standards to mobile home heating and cooling loads and to the seasonal energy consumption of the equipment meeting these loads. It also evaluates the net costs and benefits of an Office of Mobile Home Standards proposal to increase the level of stringency of the present regulation. Three mobile homes, each representing typical single - wide and double - wide homes, were selected to be simulated for 12 cities. The thermal resistance of the wall, roof, floor, door, and window components of the thermal envelope were chosen to reflect both common or potential construction methods and to obtain the overall U - value levels required by each standard level. The ''Hot House'' program was selected to determine seasonal energy consumption. Results indicate that seasonal loads decrease with decreasing U - values, although in some cases a decrease U - value resulted in a slight increase in the seasonal cooling load. The best standards for thermal performance and U - values are noted, as are sults of the cost - benefit analysis. Tables, eight references, and a ''Hot House'' program listing are included.

1981-09-25T23:59:59.000Z

294

Standard Reference Data  

Science Conference Proceedings (OSTI)

... The National Standard Reference Data System (NSRDS-NBS) provides access to the quantitative data of physical sciences, critically evaluated ...

2013-09-19T23:59:59.000Z

295

Related Metrology Standards  

Science Conference Proceedings (OSTI)

... Dynamic measurement -- Proving systems for volumetric meters -- Part 2: Pipe provers. ... Manual of Petroleum Measurement Standards. Contact. ...

2011-10-03T23:59:59.000Z

296

Distributed embedded condition monitoring systems based on OSA-CBM standard  

Science Conference Proceedings (OSTI)

This paper presents an approach to distributed condition monitoring systems that offers reusable software for a class of condition monitoring (CM) applications. The focus is on an open software framework for development of CM applications stemming from ... Keywords: Condition monitoring, Distributed systems, Java RMI, Open System Architecture for Condition Based Maintenance, Open systems

T. Sreenuch; A. Tsourdos; I. K. Jennions

2013-02-01T23:59:59.000Z

297

Development of a Rating System for a Comparative Accelerated Test Standard (Presentation)  

Science Conference Proceedings (OSTI)

This presentation discusses methods of developing and structuring a useful rating system and communicating the results.

Kurtz, S.

2013-06-01T23:59:59.000Z

298

Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems. Volume 1, Final report  

Science Conference Proceedings (OSTI)

The objective of this study is to develop standardized air blown fixed bed gasification hot gas cleanup integrated gasifier combined cycle (IGCC) systems.

Sadowski, R.S.; Brown, M.J.; Hester, J.C.; Harriz, J.T.; Ritz, G.J.

1991-02-01T23:59:59.000Z

299

Vehicle fuel economy benefit and aftertreatment requirement of an HCCI-SI engine system  

E-Print Network (OSTI)

This body of work dimensions the HCCI fuel economy benefits and required aftertreatment performance for compliance with emissions regulations in North America and Europe. The following parameters were identified as key ...

Hardy, AliciA Jillian Jackson, 1978-

2007-01-01T23:59:59.000Z

300

Measurement requirements and methods for geothermal reservoir system parameters: an appraisal  

DOE Green Energy (OSTI)

One of the key needs in the advancement of geothermal energy is the availability of adequate measurements to aid the reservoir and production engineer in the development and operation of geothermal reservoirs, wells and the overall process plant. This report documents the geothermal parameters and their measurement requirements and provides an appraisal of measurement methods and instruments capable of meeting the requirements together with recommendations on identified deficiencies.

Lamers, M.D.

1979-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Application analysis of solar total energy systems to the residential sector. Volume II, energy requirements. Final report  

DOE Green Energy (OSTI)

This project analyzed the application of solar total energy systems to appropriate segments of the residential sector and determined their market penetration potential. This volume covers the work done on energy requirements definition and includes the following: (1) identification of the single-family and multi-family market segments; (2) regionalization of the United States; (3) electrical and thermal load requirements, including time-dependent profiles; (4) effect of conservation measures on energy requirements; and (5) verification of simulated load data with real data.

Not Available

1979-07-01T23:59:59.000Z

302

Audit of Departmental Integrated Standardized Core Accounting System (DISCAS) Operations at Selected Field Sites, AP-FS-97-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF DEPARTMENTAL INTEGRATED STANDARDIZED CORE ACCOUNTING SYSTEM (DISCAS) OPERATIONS AT SELECTED FIELD SITES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

303

NWTS program criteria for mined geologic disposal of nuclear waste: program objectives, functional requirements, and system performance criteria  

SciTech Connect

At the present time, final repository criteria have not been issued by the responsible agencies. This document describes general objectives, requirements, and criteria that the DOE intends to apply in the interim to the National Waste Terminal Storage (NWTS) Program. These objectives, requirements, and criteria have been developed on the basis of DOE's analysis of what is needed to achieve the National objective of safe waste disposal in an environmentally acceptable and economic manner and are expected to be consistent with anticipated regulatory standards. The qualitative statements in this document address the broad issues of public and occupational health and safety, institutional acceptability, engineering feasibility, and economic considerations. A comprehensive set of criteria, general and project specific, of which these are a part, will constitute a portion of the technical basis for preparation and submittal by the DOE of formal documents to support future license applications for nuclear waste repositories.

None

1981-04-01T23:59:59.000Z

304

Upgrade energy building standards and develop rating system for existing low-income housing  

SciTech Connect

The city of Memphis Division of Housing and Community Development (HCD) receives grant funding each year from the U.S. Department of Housing and Urban Development (HUD) to provide local housing assistance to low-income residents. Through the years, HCD has found that many of the program recipients have had difficulty in managing their households, particularly in meeting monthly financial obligations. One of the major operating costs to low-income households is the utility bill. Furthermore, HCD`s experience has revealed that many low-income residents are simply unaware of ways to reduce their utility bill. Most of the HCD funds are distributed to low-income persons as grants or no/low interest loans for the construction or rehabilitation of single-family dwellings. With these funds, HCD builds 80 to 100 new houses and renovates about 500 homes each year. Houses constructed or renovated by HCD must meet HUD`s minimum energy efficiency standards. While these minimum standards are more than adequate to meet local building codes, they are not as aggressive as the energy efficiency standards being promoted by the national utility organizations and the home building industry. Memphis Light, Gas and Water (MLGW), a city-owned utility, has developed an award-winning program named Comfort Plus which promotes energy efficiency{open_quote} in new residential construction. Under Comfort Plus, MLGW models house plans on computer for a fee and recommends cost-effective alterations which improve the energy efficiency of the house. If the builder agrees to include these recommendations, MLGW will certify the house and guarantee a maximum annual heating/cooling bill for two years. While the Comfort Plus program has received recognition in the new construction market, it does not address the existing housing stock.

Muller, D.; Norville, C. [Memphis and Shelby County Div. of Planning and Development, TN (United States)

1993-07-01T23:59:59.000Z

305

Technical Standards, 2004 Annual Report - July 29, 2004 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Standards, 2004 Annual Report - July 29, 2004 Technical Standards, 2004 Annual Report - July 29, 2004 Technical Standards, 2004 Annual Report - July 29, 2004 July 29, 2004 Fiscal Year 2004, Annual Report to the Office of Management and Budget, Standards use and Participation The Department of Energy (DOE) implements the federal guidance and requirements of OMB Circular A-119 (OMB A-119) and the statutory requirements of Public Law (PL) 104-113 (15 USC 272) regarding the use of voluntary consensus standards (VCSs) through specific Departmental directives (policies, orders, requirements, guides, and technical standards) and supporting programs and management systems. Technical Standards, 2004 Annual Report More Documents & Publications Technical Standards, Office of Management and Budget Report for FY-2012 -

306

Direct Current Fast Charger System Characterization: Standards, Penetration Potential, Testing, and Performance Evaluation  

Science Conference Proceedings (OSTI)

The importance of direct current (dc) fast charging of plug-in electric vehicles (PEVs) is expected to grow in the near future. This report presents a brief overview of the various standards and protocols in use and in development along with a market assessment of various dc fast chargers and compatible vehicles planned. Modeling and analysis were performed to evaluate the penetration of dc fast chargers based on vehicle driving patterns, region, and charger power. A 200-V, three-phase fast charger was i...

2011-12-14T23:59:59.000Z

307

A lossy transmission line as a quantum open system in the standard quantum limit  

E-Print Network (OSTI)

We systematically investigate how to quantize a transmission line resonator (TLR) in a mesoscopic electrical circuits in the presence of the resistance and the conductance of the dielectric media. Developed from the quantum bath based effective Hamiltonian method for single mode harmonic oscillator, the approach we presented in this article is a microscopic theory integrating quantum fluctuation-dissipation relation. To qualitatively check the condition under which the TLR can behave as a quantum object we study the classical-quantum boundary characterized by the standard quantum limit.

Y. D. Wang; C. P. Sun

2004-06-30T23:59:59.000Z

308

December 2005 Standards Forum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page December 2005 Page December 2005 TSP Manager's Notes 1 Overview of the U.S. Standardization System 2 A Call for Greater Collaboration 5 Technical Standards Manager Spotlight 6 Topical Committee Developments 7 Welcome Aboard the TSMC! 8 DOE Standards Actions 9 Non-Government Standards

309

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Miscellaneous -- Volume 3, Revision 4  

Science Conference Proceedings (OSTI)

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice; (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System developments has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. This manual is divided into three volumes: Volume 1--for the control module documentation, Volume 2--for the functional module documentation, and Volume 3--for the data libraries and subroutine libraries.

Petrie, L.M.; Jordon, W.C. [Oak Ridge National Lab., TN (United States); Edwards, A.L. [Oak Ridge National Lab., TN (United States)]|[Lawrence Livermore National Lab., CA (United States)] [and others

1995-04-01T23:59:59.000Z

310

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Control modules -- Volume 1, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. This manual is divided into three volumes: Volume 1--for the control module documentation, Volume 2--for the functional module documentation, and Volume 3 for the documentation of the data libraries and subroutine libraries.

Landers, N.F.; Petrie, L.M.; Knight, J.R. [Oak Ridge National Lab., TN (United States)] [and others

1995-04-01T23:59:59.000Z

311

STATE OF CALIFORNIA AIR, WATER SIDE SYSTEM, SERVICE HOT WATER & POOL REQUIREMENTS  

E-Print Network (OSTI)

(e) Outdoor Damper Control 122(f) Isolation Zones 122(g) Pipe Insulation 123 Duct Insulation 124 or Specification2 MANDATORY MEASURES T-24 Sections Equipment Efficiency 112(a) Pipe Insulation PRESCRIPTIVE need to match the building plans schedule or specifications. If a requirement is not applicable, put "N

312

A Method to Determine Reserve Requirements for Large-Scale Renewable Integration: A Platform for Large-Scale Power Systems  

Science Conference Proceedings (OSTI)

The main industry issue addressed in this report is the increasing penetration of intermittent generation. The system adaptation for forecasting errors associated with these types of generation is to increase reserve requirements, and the adaptation for their ramping characteristics is to diversify the portfolio of complementary dispatch resources. For small quantities of intermittent generation, there is no noticeable system impact8212but at some point their forecasting errors and ramping begin to affec...

2009-12-18T23:59:59.000Z

313

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 2. Battelle Columbus Laboratories system requirements definition and system analysis  

Science Conference Proceedings (OSTI)

System specifications, design criteria, and representative weather data necessary for the system evolution and preliminary design are generated. A detailed analysis and evaluation of the commercial-sized controlled environment agriculture system coupled with a solar energy system was conducted. A simulation model to test the performance of the greenhouse is presented. (BCS)

Not Available

1981-01-01T23:59:59.000Z

314

The development of an alternate building system based on the use of an existing standardized component : precast, prestressed, hollow-core concrete slab  

E-Print Network (OSTI)

The primary scope of this thesis is a conceptual design implementation for a new building systems approach. This system is based on a standardized, economically feasible and widely used prefabricated structural component. ...

Simovic, Laszlo

1984-01-01T23:59:59.000Z

315

Plant-Wide Integrated Environment Distributed on Workstations (Plant-Window) System Functional Requirements  

Science Conference Proceedings (OSTI)

EPRI's Plant-Wide Integrated Environment Distributed on Workstations (Plant-Window) supports the activities of plant staff by providing a common, consistent, easy-to-use interface to distributed data sources, information systems, and instrumentation and control systems. This report guides utilities in the design and development of a flexible, expandable computing architecture to integrate access and functionality in upgraded plant systems. Such an architecture will increase productivity by eliminating ro...

1996-08-31T23:59:59.000Z

316

Requirements and standards for organelle genome databases  

E-Print Network (OSTI)

to the complete genome sequencing of many other organisms (guide the transition from human genome sequencing to being a04334; and Phakopsora genome sequencing direct funding).

Boore, Jeffrey L.

2006-01-01T23:59:59.000Z

317

Standard for solar collectors  

SciTech Connect

The purpose of this standard is to estabish for solar collectors: definitions; requirements for testing and rating; specifications, literature and advertising requirements; requirements for marking; requirements for safety; and conformance conditions. This standard is intended for the guidance of the industry including manufacturers, engineers, distributors, installers, contractors, and consumers. This standard applies to factory-made solar collectors using either air or a liquid as the heat transfer fluid for one or more of the following purposes: a) heating service water or other fluids and b) heating or cooling of buildings.

1977-01-01T23:59:59.000Z

318

REQUIREMENTS SPECIFICATION FOR AND EVALUATION OF AN AUTOMATED SUBSTATION MONITORING SYSTEM  

E-Print Network (OSTI)

The Substation of the Future: A Feasibility Study Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Substation of the Future Engineering Research Center (PSERC) research project T-38 titled "Substation of the Future: A Feasibility

Kezunovic, Mladen

319

A status report on the design and implementation of state renewable portfolio standards and system benefits charge policies  

DOE Green Energy (OSTI)

At last year's Windpower conference, we reported on state policies to foster renewable energy as part of efforts to restructure state electric power markets. The primary policies states are pursuing for renewables are system benefits charges (SBC) and renewable portfolio standards (RPS). Renewable portfolio standard policies began taking effect this year, while other states are continuing to work on the design of their RPS implementation strategies. In addition, states have begun distributing proceeds from their SBC funds. As a result, some renewable energy projects are beginning to materialize. This paper provides an update on state efforts with these two policies and examines some of the implementation issues and difficulties that states have faced thus far.

Porter, K.; Wiser, R.

2000-05-01T23:59:59.000Z

320

A comparative energetic analysis of active and passive emission control systems adopting standard emission test cycles  

Science Conference Proceedings (OSTI)

The present work aims at analysing and comparing the thermal performances of active and passive aftertreatment systems. A one-dimensional transient model has been developed in order to evaluate the heat exchange between the solid and the exhaust gas ...

Angelo Algieri, Mario Amelio, Pietropaolo Morrone

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

INSTRUMENTATION FLOW PLAN SYMBOLS AND RECOMMENDED DRAWINGS. A STANDARD SYSTEM FOR ORNL INSTRUMENTATION APPLICATION WORK  

SciTech Connect

A system of symbols and identifications for processinstrumentation equipment to promote a uniformity of practice is presented. The system is for the following uses: designation and identification of instruments on flow pInns; recording specifinations, listings, requisitions, and purchase orders; indication of items on piping diagrams and other construction drawings; identification tagging of equipment; and description in technical and trade literature. (J.S.R.)

Adams, R.K.; Davis, D.G.; Hyland, R.F.

1958-02-21T23:59:59.000Z

322

An Ontology For Standards  

E-Print Network (OSTI)

The paper continues the exploration of standards that the authors initiated in [1] and continued in [2] and [3]. It provides an ontology for standards---a specification of the things and relationships relevant to the topic of standards. The ontology is presented using the ISO standard graphical language, EXPRESS-G. It uses concepts from mathematical logic to clarify the content, meaning, and use of standards. Characteristics and elements of standards that are independent of any particular usage of the standard are defined. The subject matter of standardization is classified and a taxo nomy is presented. Instances of earliest use of each part of the taxonomy are described. The means of establis hing standards is discussed, together with the question of voluntary versus mandatory compliance. The paper closes with a set of conclusions regarding management process standards. The paper concentrates on those aspects of standards of importance to systems engineering, and includes numerous illustrative exa mples.

J. R. Velman; E. R. Widmann

2000-01-01T23:59:59.000Z

323

Extending and automating a systems-theoretic hazard analysis for requirements generation and analysis  

E-Print Network (OSTI)

Systems Theoretic Process Analysis (STPA) is a powerful new hazard analysis method designed to go beyond traditional safety techniques-such as Fault Tree Analysis (FTA)-that overlook important causes of accidents like ...

Thomas, John P., IV

2013-01-01T23:59:59.000Z

324

A systems approach to identifying aircraft equipage requirements, benefits, and risks of ADS-B applications  

E-Print Network (OSTI)

Automatic Dependent Surveillance-Broadcast (ADS-B) is considered to be a crucial part of the next generation of air transportation systems worldwide. Developing mature ADS-B applications which provide stakeholders with ...

Jenkins, Marisa Rachael

2009-01-01T23:59:59.000Z

325

HEATMAP©CHP - The International Standard for Modeling Combined Heat and Power Systems  

E-Print Network (OSTI)

HEATMAP©CHP is a software tool that can provide a comprehensive simulation of proposed and existing combined heat and power (CHP) plant and system applications, The software model provides a fully integrated analysis of central power production plants that are linked to district energy applications using hot water or steam for heating and/or chilled water-cooling and/or refrigeration connected to a network of buildings or other residential commercial, institutional, or industrial facilities. The program will provide designers, planners. engineers, investors, utilities, and operators with extensive technical, economical, and air emission information about a specific CHP application. The software can also be a valuable tool for community, military, regional, or national planners in defining all aspects of developing, evaluating, and justifying a new CHP project or upgrading an existing thermal system for CHP. Program output may be used to evaluate existing system performance or model the effects of various potential alternative system strategies including upgrades, expansions or conversion of thermal fluids (e.g., steam to hot water). A major feature of the program is its capability to comprehensively analyze a central CHP plant interface application involving thermal storage for both heating and cooling systems in conjunction with various technical distribution parameters covering both the supply and return elements of an extensive piping distribution system. Important features of the software include: the capability to utilize a myriad of fuel and equipment options; determination of air emission impacts that can result from CHP or central energy plant implementation; and the evaluation of extensive economic scenarios including the influence of environmental taxes on a variety of fuel alternatives.

Bloomquist, R. G.; O'Brien, R. G.

2000-04-01T23:59:59.000Z

326

Building America Top Innovations 2013 Profile … HPXML: A Standardized Home Performance Data Sharing System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

program tracking systems and program tracking systems and energy upgrade analysis software. Many software platforms are available for recording the results of home energy audits for energy-efficiency upgrades and for analyzing home energy performance. Because states and utilities have adopted different tools for compiling and analyzing the data, home performance companies that participate in multiple utility programs or operate over multiple regions need proficiency in each of the reporting platforms used. The necessity of being fluent in multiple programs and of providing results in numerous platforms dramatically increases the home performance companies' information technology infrastructure and training costs. The National Renewable Energy Laboratory (NREL) has supported the

327

USING CFD TO ANALYZE NUCLEAR SYSTEMS BEHAVIOR: DEFINING THE VALIDATION REQUIREMENTS  

SciTech Connect

A recommended protocol to formulate numeric tool specifications and validation needs in concert with practices accepted by regulatory agencies for advanced reactors is described. The protocol is based on the plant type and perceived transient and accident envelopes that translates to boundary conditions for a process that gives the: (a) key phenomena and figures-of-merit which must be analyzed to ensure that the advanced plant can be licensed, (b) specification of the numeric tool capabilities necessary to perform the required analyses—including bounding calculational uncertainties, and (c) specification of the validation matrices and experiments--including the desired validation data. The result of applying the process enables a complete program to be defined, including costs, for creating and benchmarking transient and accident analysis methods for advanced reactors. By following a process that is in concert with regulatory agency licensing requirements from the start to finish, based on historical acceptance of past licensing submittals, the methods derived and validated have a high probability of regulatory agency acceptance.

Richard Schultz

2012-09-01T23:59:59.000Z

328

Standard Test Method for Electrical Performance of Concentrator Terrestrial Photovoltaic Modules and Systems Under Natural Sunlight  

E-Print Network (OSTI)

1.1 This test method covers the determination of the electrical performance of photovoltaic concentrator modules and systems under natural sunlight using a normal incidence pyrheliometer. 1.2 The test method is limited to module assemblies and systems where the geometric concentration ratio specified by the manufacturer is greater than 5. 1.3 This test method applies to concentrators that use passive cooling where the cell temperature is related to the air temperature. 1.4 Measurements under a variety of conditions are allowed; results are reported under a select set of concentrator reporting conditions to facilitate comparison of results. 1.5 This test method applies only to concentrator terrestrial modules and systems. 1.6 This test method assumes that the module or system electrical performance characteristics do not change during the period of test. 1.7 The performance rating determined by this test method applies only at the period of the test, and implies no past or future performance level. 1.8...

American Society for Testing and Materials. Philadelphia

2009-01-01T23:59:59.000Z

329

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

330

Modeling a solar energy system for required heat and electricity of a house  

Science Conference Proceedings (OSTI)

In attaining sustainable development, energy efficiency processes and sustainable energy resources play an important role. The use of renewable energies offers a wide range of benefits and low CO2-emision. A sustainable energy system may be regarded ... Keywords: TEG modules, parabolic mirrors, photovoltaic, renewable energy (RE), seebeck module, solar energy

C?t?lin Mocanu; Krisztina Uzuneanu; Joaquim Carlos Freitas; Jorge Martins; Daniela Tasma

2012-04-01T23:59:59.000Z

331

Monitoring Precipitation over the Arctic Terrestrial Drainage System: Data Requirements, Shortcomings, and Applications of Atmospheric Reanalysis  

Science Conference Proceedings (OSTI)

An effort is under way aimed at historical analysis and monitoring of the pan-Arctic terrestrial drainage system. A key element is the provision of gridded precipitation time series that can be readily updated. This has proven to be a daunting ...

Mark C. Serreze; Martyn P. Clark; David H. Bromwich

2003-04-01T23:59:59.000Z

332

Standard assumptions and methods for solar heating and cooling systems analysis  

DOE Green Energy (OSTI)

A set of inputs, assumptions, analytical methods, and a reporting format is presented to help compare the results of residential and commercial solar system analyses being performed by different investigators. By the common use of load data, meteorological data, economic parameters, and reporting format, researchers examining, for example, two types of collectors may more easily compare their results. For residential heating and cooling systems, three locations were selected. The weather data chosen to characterize these cities are the Typical Meteorological Year (TMY). A house for each location was defined that is typical of new construction in that locale. Hourly loads for each location were calculated using a computerized load model that interacts with the system specified inputs characterizing each house. Four locations for commercial cooling analyses were selected from among the existing sites for which TMYs were available. A light commercial (nominal 25-ton cooling load) office building was defined and is used in all four locations. Hourly cooling and heating loads were computed for each city and are available on magnetic tape from the Solar Energy Research Insititute (SERI).

Leboeuf, C.M.

1980-01-01T23:59:59.000Z

333

Applying the Systems Engineering Process for Establishing Requirements for the Safety and Health Monitoring System of the Waste Solidification Building at the Savannah River Site  

Science Conference Proceedings (OSTI)

The Safety and Health Monitoring (SHM) System technical basis document for the Waste Solidification Building (WSB) was developed by the Westinghouse Savannah River Company design team. The WSB is being designed and built to support the waste disposal needs of the Pit Disassembly and Conversion Facility (PDCF) and the Mixed Oxide Fuel Fabrication Facility (MFFF) at the Savannah River Site (SRS) in South Carolina. The main mission of the WSB is to process the radiological liquid waste streams from the PDCF and the MFFF into a solid waste form. The solid waste form, concrete encased waste, is acceptable for shipment and disposal as transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP) and as Low Level Waste (LLW) at on-site disposal areas. The SHM System will also handle the job control waste from the PDCF, the MFFF, and the WSB. The SHM System will serve the WSB by monitoring personnel radiation exposure and environmental releases. The WSB design used HPT design support in determining the air monitoring equipment required for the WSB. The Systems Engineering (SE) process was applied to define the functions and requirements necessary to design and operate the SHM System. The SE process is a proven disciplined approach that supports management in clearly defining the mission or problem, managing system functions and requirements, identifying and managing risk, establishing bases for informed decision making, and verifying that products and services meet customer needs. This SE process applied to the SHM System was a major effort encompassing requirements analysis and interface control. Use of the SE process combined with HPT design input resulted in well-defined requirements to support the procurement of a safe-mission essential SHM System.

Simpkins, P.J.

2003-10-09T23:59:59.000Z

334

Standards, Ethics  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards, Ethics Ombuds Standards and Ethics Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact...

335

Find Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

may not be available from IHS: AHRI standards - from the Air Conditioning, Heating, and Refrigeration Institute AISC standards - from the American Institute of Steel Construction...

336

Technical Specification action statements requiring shutdown. A risk perspective with application to the RHR/SSW systems of a BWR  

SciTech Connect

When safety systems fail during power operation, the limiting conditions for operation (LCOs) and associated action statements of technical specifications typically require that the plant be shut down within the limits of allowed outage time (AOT). However, when a system needed to remove decay heat, such as the residual heat removal (RHR) system, is inoperable or degraded, shutting down the plant may not necessarily be preferable, from a risk perspective, to continuing power operation over a usual repair time, giving priority to the repairs. The risk impact of the basic operational alternatives, i.e., continued operation or shutdown, was evaluated for failures in the RHR and standby service water (SSW) systems of a boiling-water reactor (BWR) nuclear power plant. A complete or partial failure of the SSW system fails or degrades not only the RHR system but other front-line safety systems supported by the SSW system. This report presents the methodology to evaluate the risk impact of LCOs and associated AOT; the results of risk evaluation from its application to the RHR and SSW systems of a BWR; the findings from the risk-sensitivity analyses to identify alternative operational policies; and the major insights and recommendations to improve the technical specifications action statements.

Mankamo, T. [Avaplan Oy, Espoo (Finland); Kim, I.S.; Samanta, P.K. [Brookhaven National Lab., Upton, NY (United States)

1993-11-01T23:59:59.000Z

337

Systems Modeling, Simulation and Material Operating Requirements for Chemical Hydride Based Hydrogen Storage  

Science Conference Proceedings (OSTI)

Research on ammonia borane (AB, NH3BH3) has shown it to be a promising material for chemical hydride based hydrogen storage. AB was selected by DOE's Hydrogen Storage Engineering Center of Excellence (HSECoE) as the initial chemical hydride of study because of its high hydrogen storage capacity (up to 19.6% by weight for the release of {approx}2.5 molar equivalents of hydrogen gas) and its stability under typical ambient conditions. A new systems concept based on augers, ballast tank, hydrogen heat exchanger and H2 burner was designed and implemented in simulation. In this design, the chemical hydride material was assumed to produce H2 on the augers itself, thus minimizing the size of ballast tank and reactor. One dimensional models based on conservation of mass, species and energy were used to predict important state variables such as reactant and product concentrations, temperatures of various components, flow rates, along with pressure, in various components of the storage system. Various subsystem components in the models were coded as C language S-functions and implemented in Matlab/Simulink environment. The control variable AB (or alane) flow rate was determined through a simple expression based on the ballast tank pressure, H2 demand from the fuel cell and hydrogen production from AB (or alane) in the reactor. System simulation results for solid AB, liquid AB and alane for both steady state and transient drive cycle cases indicate the usefulness of the model for further analysis and prototype development.

Devarakonda, Maruthi N.; Brooks, Kriston P.; Ronnebro, Ewa; Rassat, Scot D.

2012-02-01T23:59:59.000Z

338

Energy Management for Real-Time Embedded Systems with Reliability Requirements  

E-Print Network (OSTI)

With the continued scaling of CMOS technologies and reduced design margins, the reliability concerns induced by transient faults have become prominent. Moreover, the popular energy management technique dynamic voltage and frequency scaling (DVFS) has been shown to have direct and negative effects on reliability. In this work, for a set of real-time tasks, we focus on the slack allocation problem to minimize their energy consumption while preserving the overall system reliability. Building on our previous findings for a single real-time application where a recovery task was used to preserve reliability, we identify the problem of reliabilityaware energy management for multiple tasks as NP-hard and propose two polynomial-time heuristic schemes. We also investigate the effects of on-chip/off-chip workload decomposition on energy management, by considering a generalized power model. Simulation results show that ordinary energy management schemes could lead to drastically decreased system reliability, while the proposed reliability-aware heuristic schemes are able to preserve the system reliability and obtain significant energy savings at the same time.

Dakai Zhu; et al.

2006-01-01T23:59:59.000Z

339

Building America Top Innovations 2013 Profile … HPXML: A Standardized Home Performance Data Sharing System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

home performance program tracking home performance program tracking systems and energy upgrade analysis software. Many software platforms are available for recording the results of home energy audits for energy-efficiency upgrades and for analyzing home energy performance. Because states and utilities have adopted different tools for compiling and analyzing the data, home performance companies that participate in multiple utility programs or operate over multiple regions need proficiency in each of the reporting platforms used. The necessity of being fluent in multiple programs and of providing results in numerous platforms dramatically increases the home performance companies' information technology infrastructure and training costs. The National Renewable Energy Laboratory (NREL) has supported the

340

System requirements for one-time-use ENRAF control panel software  

SciTech Connect

An Enraf Densitometer is installed on tank 241-AY-102. The Densitometer will frequently be tasked to obtain and log density profiles. The activity can be effected a number of ways. Enraf Incorporated provides a software package called ''Logger18'' to its customers for the purpose of in-shop testing of their gauges. Logger18 is capable of accepting an input file which can direct the gauge to obtain a density profile for a given tank level and bottom limit. Logger18 is a complex, DOS based program which will require trained technicians and/or tank farm entries to obtain the data. ALARA considerations have prompted the development of a more user-friendly, computer-based interface to the Enraf densitometers. This document records the plan by which this new Enraf data acquisition software will be developed, reviewed, verified, and released. This plan applies to the development and implementation of a one-time-use software program, which will be called ''Enraf Control Panel.'' The software will be primarily used for remote operation of Enraf Densitometers for the purpose of obtaining and logging tank product density profiles.

HUBER, J.H.

1999-08-19T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Tank Waste Remediation System tank waste pretreatment and vitrification process development testing requirements assessment  

Science Conference Proceedings (OSTI)

A multi-faceted study was initiated in November 1993 to provide assurance that needed testing capabilities, facilities, and support infrastructure (sampling systems, casks, transportation systems, permits, etc.) would be available when needed for process and equipment development to support pretreatment and vitrification facility design and construction schedules. This first major report provides a snapshot of the known testing needs for pretreatment, low-level waste (LLW) and high-level waste (HLW) vitrification, and documents the results of a series of preliminary studies and workshops to define the issues needing resolution by cold or hot testing. Identified in this report are more than 140 Hanford Site tank waste pretreatment and LLW/HLW vitrification technology issues that can only be resolved by testing. The report also broadly characterizes the level of testing needed to resolve each issue. A second report will provide a strategy(ies) for ensuring timely test capability. Later reports will assess the capabilities of existing facilities to support needed testing and will recommend siting of the tests together with needed facility and infrastructure upgrades or additions.

Howden, G.F.

1994-10-24T23:59:59.000Z

342

January 2012 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* DOE Conduct of Operations Standards Revisions * New DOE Standards Projects * DOE Handbook of Operational Safety and Analysis Techniques * Nuclear Safety- Related Standards Activity INSIDE THIS ISSUE January 2012 Standards Actions Technical Standards Program Newsletter www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE Conduct of Operations Standards Revisions In the early 1990s, the Department of Energy (DOE) developed 17 technical standards to support DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The standards (STDs), listed below, provided examples, good practices, and expanded explanations of the topics in each chapter of the Order. In June 2010, the Order was revised and issued as DOE Order 422.1, Conduct of Operations. The

343

Strategic Standardization  

Science Conference Proceedings (OSTI)

... Program Strategic Standardization Curriculum (CMGT 564 - 2010) ... com. Curriculum ks eport, 1992), Grading (Research paper, ...

2012-12-03T23:59:59.000Z

344

Hardness Standardization  

Science Conference Proceedings (OSTI)

... metallic products. • NIST produces a variety of hardness Standard Reference Materials (SRMs) for industry. • The NIST ...

2013-08-20T23:59:59.000Z

345

Interconnection Standards | Open Energy Information  

Open Energy Info (EERE)

Interconnection Standards Interconnection Standards Jump to: navigation, search Interconnection standards govern the technical and procedural process by which an electric customer connects an electric-generating system to the grid. Interconnection standards specify the technical, contractual, metering, and rate rules that system owners and utilities must abide by. Standards for systems interconnected at the distribution level are typically adopted by state public utility commissions, while the Federal Energy Regulatory Commission (FERC) has adopted standards for systems interconnected at the transmission level. Not all states have adopted interconnection standards, and some states’ standards apply only to investor-owned utilities – not to municipal utilities and electric cooperatives. [1]

346

Natural Gas Vehicle and Infrastructure Codes and Standards Chart (Revised) (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Natural Gas Vehicle and Infrastructure Codes and Standards Chart Natural Gas Vehicle and Infrastructure Codes and Standards Chart Many standards development organizations (SDOs) are working to develop codes and standards needed for the utilization of alternative fuel vehicle technologies. This chart shows the SDOs responsible for leading the support and development of key codes and standards for natural gas. Vehicle Safety: Vehicle Fuel Systems: Vehicle Containers: Vehicle Fuel System Components: Dispensing Component Standards: Dispensing Operations: Dispensing Vehicle Interface: Storage Containers: Storage Pressure Relief Devices: Storage System Siting: Storage and Production: Building and Fire Code Requirements: Organization Name Standards Development Areas AGA American Gas Association Materials testing standards API American Petroleum Institute

347

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation: Functional modules F1-F8  

SciTech Connect

This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This volume consists of the section of the manual dealing with eight of the functional modules in the code. Those are: BONAMI - resonance self-shielding by the Bondarenko method; NITAWL-II - SCALE system module for performing resonance shielding and working library production; XSDRNPM - a one-dimensional discrete-ordinates code for transport analysis; XSDOSE - a module for calculating fluxes and dose rates at points outside a shield; KENO IV/S - an improved monte carlo criticality program; COUPLE; ORIGEN-S - SCALE system module to calculate fuel depletion, actinide transmutation, fission product buildup and decay, and associated radiation source terms; ICE.

NONE

1997-03-01T23:59:59.000Z

348

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

349

Appliance Efficiency Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Appliance Efficiency Standards Part 2 of 2: Policy process and consumer gains Part 1 of this article (CBS News, Spring 1995) discussed LBNL's role in setting federal appliance efficiency standards and presented an overview of the net national benefits of standards. Here, we examine the broader policy context for appliance standards and consumer benefits. Policy Context Appliance efficiency standards provide a minimum requirement for energy efficiency at the point of manufacture (or import). These standards seek to overcome market failures-including price distortions and transaction costs-that have historically given rise to a gap between observed and attainable product efficiencies. In this way, appliance standards complement information programs, utility DSM and other incentive programs,

350

Technical Standards, 2004 Annual Report - July 29, 2004 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2004 Annual Report - July 29, 2004 2004 Annual Report - July 29, 2004 Technical Standards, 2004 Annual Report - July 29, 2004 July 29, 2004 Fiscal Year 2004, Annual Report to the Office of Management and Budget, Standards use and Participation The Department of Energy (DOE) implements the federal guidance and requirements of OMB Circular A-119 (OMB A-119) and the statutory requirements of Public Law (PL) 104-113 (15 USC 272) regarding the use of voluntary consensus standards (VCSs) through specific Departmental directives (policies, orders, requirements, guides, and technical standards) and supporting programs and management systems. Technical Standards, 2004 Annual Report More Documents & Publications Technical Standards, Office of Management and Budget Report for FY-2012 - December 19, 2012

351

Solar Construction Permitting Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Solar Construction Permitting Standards < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Local Government Nonprofit Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Colorado Energy Office Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities have been free to assign their own fees for a permit. These fees can vary broadly in size across jurisdictions and in some cases, can be large enough

352

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

353

ASHRAE Standard 152 Spreadsheet | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ASHRAE Standard 152 Spreadsheet ASHRAE Standard 152 Spreadsheet ASHRAE Standard 152 quantifies the delivery efficiency of duct systems, based on factors including location,...

354

Seismic Performance Requirements for WETF  

Science Conference Proceedings (OSTI)

This report develops recommendations for requirements on the Weapons Engineering Tritium Facility (WETF) performance during seismic events. These recommendations are based on fragility estimates of WETF structures, systems, and components that were developed by LANL experts during facility walkdowns. They follow DOE guidance as set forth in standards DOE-STD-1021-93, ''Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components'' and DOE-STD-1020-94, ''Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities''. Major recommendations are that WETF institute a stringent combustible loading control program and that additional seismic bracing and anchoring be provided for gloveboxes and heavy equipment.

Hans Jordan

2001-01-01T23:59:59.000Z

355

Meeting Residential Ventilation Standards Through Dynamic Control...  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Residential Ventilation Standards Through Dynamic Control of Ventilation Systems Title Meeting Residential Ventilation Standards Through Dynamic Control of Ventilation...

356

Generic Requirements Specification for Upgrading the Safety-Related Reactor Trip and Engineered Safety Features Actuation Systems in Westinghouse PWR Nuclear Power Plants  

Science Conference Proceedings (OSTI)

To address obsolescence concerns, a generic requirements specification for digital upgrades to existing reactor trip systems and engineered safety features actuation systems in a Westinghouse pressurized water reactor (PWR) was developed. System requirements are based on a 4-loop PWR with a solid-state protection system since this typifies the most advanced capability level. However, the specification is applicable to relay-based 2- and 3-loop plants where some or all of the advances in the newest solid-...

2001-10-19T23:59:59.000Z

357

Login Required  

Science Conference Proceedings (OSTI)

... please enter your search term(s). National Institute of Standards and Technology. **WARNING**WARNING**WARNING**WARNING**WARNING** ...

358

Radiological Control Technician: Standardized technician Qualification Standard  

Science Conference Proceedings (OSTI)

The Qualification Standard states and defines the knowledge and skill requirements necessary for successful completion of the Radiological Control Technician Training Program. The standard is divided into three phases: Phase I concerns RCT Academic training. There are 13 lessons associated with the core academics program and 19 lessons associated with the site academics program. The staff member should sign the appropriate blocks upon successful completion of the examination for that lesson or group of lessons. In addition, facility specific lesson plans may be added to meet the knowledge requirements in the Job Performance Measures (JPM) of the practical program. Phase II concerns RCT core/site practical (JPMs) training. There are thirteen generic tasks associated with the core practical program. Both the trainer/evaluator and student should sign the appropriate block upon successful completion of the JPM. In addition, facility specific tasks may be added or generic tasks deleted based on the results of the facility job evaluation. Phase III concerns the oral examination board successful completion of the oral examination board is documented by the signature of the chairperson of the board. Upon completion of all of the standardized technician qualification requirements, final qualification is verified by the student and the manager of the Radiological Control Department and acknowledged by signatures on the qualification standard. The completed Qualification Standard shall be maintained as an official training record.

Not Available

1992-10-01T23:59:59.000Z

359

ANSI N42.42 Standard  

Science Conference Proceedings (OSTI)

... requirements for these types of instruments are described in other standards. ... The ANSI/IEEE standard does not address instrument control, data ...

2013-06-05T23:59:59.000Z

360

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

been required to comply with the Department of Energy's (DOE) energy conservation standards for commercial clothes washers since 2007. Commercial clothes washers use a water...

362

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

been required to comply with the Department of Energy's (DOE) energy conservation standards for residential pool heaters since 1990. Residential pool heaters are used to heat...

363

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

have been required to comply with the Department of Energy (DOE) energy conservation standards for fluorescent lamp ballasts since 1990. Fluorescent lamp ballasts control electric...

364

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

been required to comply with the Department of Energy's (DOE) energy conservation standards for refrigerated beverage vending machines since 2012. Refrigerated beverage vending...

365

Emission Standards for Contaminants (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations list emissions standards for various contaminants, and contain special requirements for anaerobic lagoons. These regulations also describe alternative emissions limits, which may...

366

TECHNIQUE, REFERENCE STANDARD, EQUIPMENT  

E-Print Network (OSTI)

has met the requirements of the IAS Accreditation Criteria for Calibration Laboratories (AC204), has demonstrated compliance with the ANS/ISO/IEC Standard 17025:2005, General requirements for the competence of testing and calibration laboratories, and has been accredited commencing July 10, 2012, for the calibration discipline(s) listed in the approved scope of accreditation. The laboratory meets IAS program requirements in the field of calibration.

Teknik Malzeme; Is Merkezi; Yenisehir Izmir; Patrick V. Mccullen; C. P. Ramani; Teknik Malzeme Merkezi; M Meatest; Multifunction Calibrator

2012-01-01T23:59:59.000Z

367

Building Technologies Program: About Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

About Standards to About Standards to someone by E-mail Share Building Technologies Program: About Standards on Facebook Tweet about Building Technologies Program: About Standards on Twitter Bookmark Building Technologies Program: About Standards on Google Bookmark Building Technologies Program: About Standards on Delicious Rank Building Technologies Program: About Standards on Digg Find More places to share Building Technologies Program: About Standards on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR® Popular Links Success Stories Previous Next Lighten Energy Loads with System Design. Learn More. Warming Up to Pump Heat. Learn More. Cut Refrigerator Energy Use to Save Money. Learn More.

368

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

369

Creating and Implementing a Regularized Monitoring and Enforcement System for China's Mandatory Standards and Energy Information Label for Appliances  

E-Print Network (OSTI)

Information Label for Appliances Author: Jiang Lin MarchBasic Structure of China’s Appliance Standards and Labelingbasic infrastructure for appliance performance testing is in

Lin, Jiang

2008-01-01T23:59:59.000Z

370

WELDING STANDARDS  

SciTech Connect

Hanford Atomic Production Operation specification guides and standards for welding and brazing are presented. Details of this manual are given in TID- 4100 (Suppl.). (N.W.R.)

1963-01-01T23:59:59.000Z

371

An Overview of Nuclear vs. Non-Nuclear Design Code Requirements for a Candidate Steam Supply System for Commercial Applications  

SciTech Connect

The objective is to identify (mostly for industrial end-users) the difference between a Section III nuclear steam generator (classified as Structures, Systems and Components (SSC)) and a Section VIII steam generator in the same general conditions, but used in a conventional application. Specifically, applicable temperature and pressure ranges and a more quantitative description of how materials change, design margins change and required design rigor changes are of interest. This overview focuses on the steam generator pressure boundary but the downstream piping will also be considered. Within the designations of Section III and Section VIII there are subcategories with their specific regions of applicability. Each of these subcategories has evolved their own unique features with respect to design rules and their implementation. A general overview of the various design codes will be provided in sufficient detail to illustrate the major differences; however, a detailed discussion of the various design requirements and their implementation is beyond the scope of this discussion. References (1) and (2) are sources of more detailed information. Also, example wall sizing calculations will be provided to illustrate the application of the relevant design codes under the candidate design conditions. The candidate steam supply Design Conditions are 600C (1112F) and 24MPa (3,480psi). The Operating Conditions or Service Levels will be somewhat lower and the difference shows up in some of the various design methodologies employed.

Robert Jetter

2011-04-01T23:59:59.000Z

372

DOE standard: Radiological control  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) has developed this Standard to assist line managers in meeting their responsibilities for implementing occupational radiological control programs. DOE has established regulatory requirements for occupational radiation protection in Title 10 of the Code of Federal Regulations, Part 835 (10 CFR 835), ``Occupational Radiation Protection``. Failure to comply with these requirements may lead to appropriate enforcement actions as authorized under the Price Anderson Act Amendments (PAAA). While this Standard does not establish requirements, it does restate, paraphrase, or cite many (but not all) of the requirements of 10 CFR 835 and related documents (e.g., occupational safety and health, hazardous materials transportation, and environmental protection standards). Because of the wide range of activities undertaken by DOE and the varying requirements affecting these activities, DOE does not believe that it would be practical or useful to identify and reproduce the entire range of health and safety requirements in this Standard and therefore has not done so. In all cases, DOE cautions the user to review any underlying regulatory and contractual requirements and the primary guidance documents in their original context to ensure that the site program is adequate to ensure continuing compliance with the applicable requirements. To assist its operating entities in achieving and maintaining compliance with the requirements of 10 CFR 835, DOE has established its primary regulatory guidance in the DOE G 441.1 series of Guides. This Standard supplements the DOE G 441.1 series of Guides and serves as a secondary source of guidance for achieving compliance with 10 CFR 835.

Not Available

1999-07-01T23:59:59.000Z

373

Advanced Turbine Systems program conceptual design and product development. Task 2: Information required for the National Environmental Policy Act  

Science Conference Proceedings (OSTI)

In cooperation with the US Department of Energy`s Morgantown Energy Technology Center, under contract DE-AC21-93MC30247, a Westinghouse Electric led team is working on a 10-year, four-phase Advanced Turbine Systems (ATS) program to develop the technology required to provide a significant increase in natural gas-fired combined cycle power generation plant efficiency. Environmental performance is to be enhanced, and busbar energy costs are to be 10% less than those of current state-of-the-art-turbines. In Phase II of the ATS program, the objective is to develop the conceptual design of this innovative natural-gas-fired advanced turbine system (GFATS) which, in combination with increased firing temperature ({ge}2600{degree}F), increased component efficiencies, and reduced cooling air usage, has the potential of achieving a lower heating value (LHV) plant efficiency in excess of 60%. Other program goals include providing flexibility to burn both natural gas and coal-derived fuels, holding water consumption to levels consistent with cost and efficiency goals, and having improved environmental performance. Phase II also includes development of an integrated plan to commercialize a GFATS by the year 2000, and initiation of R&D on engine components critical to the success of the plan. Figure 1 is the summary program schedule for Task 8; Design and Test of Critical Components.

Not Available

1993-11-01T23:59:59.000Z

374

Test Requirements and Conceptual Design for a Potassium Test Loop to Support an Advanced Potassium Rankine Cycle Power Conversion Systems  

SciTech Connect

Parameters for continuing the design and specification of an experimental potassium test loop are identified in this report. Design and construction of a potassium test loop is part of the Phase II effort of the project ''Technology Development Program for an Advanced Potassium Rankine Power Conversion System''. This program is supported by the National Aeronautics and Space Administration. Design features for the potassium test loop and its instrumentation system, specific test articles, and engineered barriers for ensuring worker safety and protection of the environment are described along with safety and environmental protection requirements to be used during the design process. Information presented in the first portion of this report formed the basis to initiate the design phase of the program; however, the report is a living document that can be changed as necessary during the design process, reflecting modifications as additional design details are developed. Some portions of the report have parameters identified as ''to be determined'' (TBD), reflecting the early stage of the overall process. In cases where specific design values are presently unknown, the report attempts to document the quantities that remain to be defined in order to complete the design of the potassium test loop and supporting equipment.

Yoder, JR.G.L.

2006-03-08T23:59:59.000Z

375

Propane Vehicle and Infrastructure Codes and Standards Chart (Revised) (Fact Sheet), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Many standards development organizations (SDOs) are working to develop codes and standards needed for the utilization of alternative fuel Many standards development organizations (SDOs) are working to develop codes and standards needed for the utilization of alternative fuel vehicle technologies. This chart shows the SDOs responsible for leading the support and development of key codes and standards for propane. Propane Vehicle and Infrastructure Codes and Standards Chart Vehicle Systems Safety: Vehicle Tanks and Piping: Vehicle Components: Vehicle Dispensing Systems: Vehicle Dispensing System Components: Storage Systems: Storage Containers and Piping: Storage Container Pressure Relief Devices and Venting: Production Storage Systems: Production Process Safety: Pipelines: Building and Fire Code Requirements: Organization Name Standards Development Areas AGA American Gas Association Materials testing standards

376

SCALE: A modular code system for performing Standardized Computer Analyses for Licensing Evaluation. Volume 1, Part 2: Control modules S1--H1; Revision 5  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automated the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.3 of the system.

NONE

1997-03-01T23:59:59.000Z

377

SAE Standards Support  

Science Conference Proceedings (OSTI)

This report summarizes PNNL activities in FY 2012 in support of the following two vehicle communication standards activities: • Technical support to SAE, ANSI and NIST technical working groups. PNNL actively contributed to the use case development, harmonization, and evaluation of the SAE standards activities for vehicle to grid communication • Tested and validated a set of potential technologies for meeting SAE communication requirements and provided recommendations for technology choices.

Gowri, Krishnan

2012-11-01T23:59:59.000Z

378

Page 5-22- Water Heating Requirements – Glossary/Reference Figure 5-2 – Point of Use Distribution System Pipe Insulation  

E-Print Network (OSTI)

Credit is available for insulation of hot water pipes in addition to insulation required by the mandatory requirements. For systems serving a single dwelling unit, this credit applies only to non-circulating systems. For systems serving multiple dwelling units, there is a pipe insulation credit for recirculating piping external to dwelling units if pipes are insulated to a higher R-value than the mandatory minimum. Installation Criteria (Single Dwelling Unit): Insulation must meet the level required in the mandatory requirements. Note that pipes buried under ceiling insulation can meet the mandatory requirements. Note: Heat tape – electric resistance heating tape wrapped around hot water pipes – may be used only for freeze protection and cannot be used instead of mandatory pipe insulation (see Section §150(j)) or pipe insulation receiving

unknown authors

2005-01-01T23:59:59.000Z

379

MODEL CONSERVATION STANDARD INTRODUCTION  

E-Print Network (OSTI)

standards and surcharge methodology. 2 The term "system cost" means an estimate of all direct costs and transmission to the consumer and, among other factors, waste disposal costs, end-of-cycle costs, and fuel costs. SURCHARGE RECOMMENDATION The Council does not recommend that the model conservation standards be subject

380

A Primer on Korea's Standards System: Standardization ...  

Science Conference Proceedings (OSTI)

... anticipate that another governmental restructuring is expected ... was designated as secretariat office to register ... KRISS has two offices directly under ...

2013-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Proposal for a Guide for Quality Management Systems for PV Manufacturing: Supplemental Requirements to ISO 9001-2008  

SciTech Connect

This technical specification provides a guideline for photovoltaic module manufacturers to produce modules that, once the design has proven to meet the quality and reliability requirements, replicate such design in an industrial scale without compromising its consistency with the requirements.

Norum, P.; Sinicco, I.; Eguchi, Y.; Lokanath, S.; Zhou, W.; Brueggemann, G.; Mikonowicz, A.; Yamamichi, M.; Kurtz, S.

2013-06-01T23:59:59.000Z

382

Executive Director for Operations CONSIDERATION OF ADDITIONAL REQUIREMENTS FOR CONTAINMENT VENTING SYSTEMS FOR BOILING WATER REACTORS WITH MARK I AND MARK II CONTAINMENTS  

E-Print Network (OSTI)

information, options, and a recommendation from the NRC staff to impose new requirements for containment venting systems for boiling-water reactors (BWRs) with Mark I and Mark II containments. This paper is provided in response to the Commission’s staff requirements memorandum (SRM) for SECY-11-0137, “Prioritization of Recommended Actions To Be

R. W. Borchardt

2012-01-01T23:59:59.000Z

383

Modernizing the passing joint : a standardized building system to facilitate contemporary bamboo housing construction in regions of economic constraint  

E-Print Network (OSTI)

The thesis was inspired by the excellent mechanical properties of bamboo and its positive environmental effects. Despite its abundance and great qualities, the material has not been incorporated into the history of standard ...

Bentcheva, Yuliya D

2012-01-01T23:59:59.000Z

384

EOS standards  

SciTech Connect

An approach to creating accurate EOS for pressure standards is described. Applications to Cu, Au, and Ta are shown. Extension of the method to high compressions using DFT is illustrated. Comparisons with modern functionals show promise.

Greeff, Carl W [Los Alamos National Laboratory

2011-01-12T23:59:59.000Z

385

Development of standardized air-blown coal gasifier/gas turbine concepts for future electric power systems  

SciTech Connect

CRS Sirrine (CRSS) is evaluating a novel IGCC process in which gases exiting the gasifier are burned in a gas turbine combustion system. The turbine exhaust gas is used to generate additional power in a conventional steam generator. This results in a significant increase in efficiency. However, the IGCC process requires development of novel approaches to control SO{sub 2} and NO{sub x} emissions and alkali vapors which can damage downstream turbine components. Ammonia is produced from the reaction of coal-bound nitrogen with steam in the reducing zone of any fixed bed coal gasifier. This ammonia can be partially oxidized to NO{sub x} when the product gas is oxidized in a gas turbine combustor. Alkali metals vaporize in the high-temperature combustion zone of the gasifier and laser condense on the surface of small char or ash particles or on cooled metal surfaces. It these alkali-coated materials reach the gas turbine combustor, the alkali will revaporize condense on turbine blades and cause rapid high temperature corrosion. Efficiency reduction will result. PSI Technology Company (PSIT) was contracted by CRSS to evaluate and recommend solutions for NO{sub x} emissions and for alkali metals deposition. Various methods for NO{sub x} emission control and the potential process and economic impacts were evaluated. This included estimates of process performance, heat and mass balances around the combustion and heat transfer units and a preliminary economic evaluation. The potential for alkali metal vaporization and condensation at various points in the system was also estimated. Several control processes and evaluated, including an order of magnitude cost for the control process.

1990-07-01T23:59:59.000Z

386

Natural Gas Vehicle and Infrastructure Codes and Standards Citations (Brochure), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Natural Gas Vehicle and Infrastructure Codes and Standards Citations Natural Gas Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. natural gas vehicle and infrastructure projects. To determine which codes and standards apply to a specific project, identify the codes and standards currently in effect within the jurisdiction where the project will be located. Some jurisdictions also have unique ordinances or regulations that could apply. Learn about codes and standards basics at www.afdc.energy.gov/afdc/codes_standards_basics.html. Find natural gas vehicle and infrastructure codes and standards in these categories: * Fire Code Requirements * General CNG Requirements and Equipment Qualifications * CNG Engine Fuel Systems * CNG Compression, Gas Processing, Storage, and Dispensing Systems

387

Standards for ICCP API  

Science Conference Proceedings (OSTI)

The Inter-Control Center Communication Protocol (ICCP) was developed as an EPRI project for the exchange of power system information between control centers, or between a control center and a generation control system or substation. ICCP is now an international standard, IEC 60870-6 known as Telecontrol Application Service Element 2 (TASE.2). However, the application program interface (API) was not a part of that standard and was left as a "local implementation issue" for each ICCP vendor to define. The ...

1999-12-10T23:59:59.000Z

388

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Home Weatherization Wind Program Info State Pennsylvania Program Type Interconnection Provider Pennsylvania Public Utility Commission The Pennsylvania Public Utilities Commission was required to adopt interconnection standards and net-metering rules by the Alternative Energy Portfolio Standards Act of 2004.The PUC subsequently adopted interconnection standards for net-metered distributed generation (DG)

389

Nuclear Criticality Safety Requirements Implementation Matrix for Tank Farms  

SciTech Connect

This document provides a detailed matrix of specific Tank Farms nuclear criticality safety program elements indexed to primary requirements documents. These requirements are collected at a higher level in HNF-SO-MP-SRID-001, ''Tank Waste Remediation System Standards/Requirements Identification Document.'' The intended use of this document is to provide a roadmap for implementing procedures and assessments.

WEISS, E.V.

2000-05-17T23:59:59.000Z

390

March-April 2009 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March/April 2009 U.S. Department of Energy Technical Standards Program (http://www.hss.energy.gov/nuclearsafety/ns/techstds/) The Standards Forum And Standards Actions Technical Standards Program Manager's Note Welcome to the March/April 2009 edition of the Technical Standards Forum and Standards Actions. The Department of Energy (DOE) Technical Standards Program (TSP) continues to provide timely and efficient standards development services to the Department and its contractors. Recently, the TSP acquired the ability to perform title and abstract searches on Non-Government Standards (NGS) available in the private sector. This tool enables the TSP and its customers to identify available NGS that could support implementation of DOE requirements. Office of Management and Budget Circular No.

391

Standard Modeling  

NLE Websites -- All DOE Office Websites (Extended Search)

Standard no es suficiente Standard no es suficiente Avanzar Volver Principal ESTOY PERDIDO!!! Si bien el Modelo Standard proporciona una descripción muy buena de los fenómenos observados en los experimentos, todavía es una teoría incompleta. El problema es que el Modelo Standard no puede explicar la causa por la que existen algunas partículas, del modo en que lo hacen. Por ejemplo, aún cuando los físicos conocían las masas de todos los quarks, a excepción de la del quark top desde hace muchos años, no podían simplemente predecir en forma exacta la masa del top, sin utilizar evidencia experimental, dado que el Modelo Standard carece de un modelo matemático para calcular el patrón que siguen los valores de las masas de las partículas. Otra cuestión está relacionada con el hecho que existen tres pares de

392

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

393

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

394

Appliances and Commercial Equipment Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Central Air Conditioners and Heat Pumps Residential Central Air Conditioners and Heat Pumps Sign up for e-mail updates on regulations for this and other products Manufacturers have been required to comply with the Department of Energy's (DOE) energy conservation standards for residential central air conditioners and heat pumps since 1992. Residential central air conditioners and heat pumps are installed as part of a home's central heating and cooling system. They use ducts to distribute cooled or dehumidified air to more than one room. Residential central air conditioners and heat pumps include split system central air conditioners and heat pumps; single package central air conditioners, small-duct high-velocity products, and space constrained products. The standards mandatory in 1992 and 1993 will save approximately 2.9 quads of energy and result in approximately $29 billion in energy bill savings from 1993-2023. The standard will avoid about 160 million metric tons of carbon dioxide emissions, equivalent to the annual greenhouse gas emissions of about 31.4 million automobiles.

395

Tank waste remediation system retrieval and disposal mission readiness-to-proceed guidance and requirements to deliverables crosswalk  

Science Conference Proceedings (OSTI)

In September 1996, the US Department of Energy, Richland Operations Office (RL) initiated the first of a two-phase program to remediate waste storage in tanks at the Hanford Site in Washington State. Initiating the first phase, RL signed contracts with two private companies who agreed to receive and vitrify a portion of the tank waste in a demonstration and to return the vitrified product and by-products to the Project Management Hanford Contract (PHMC) team for disposition. The first phase of the overall remediation effort is a demonstration of treatment concepts, and the second phase includes treatment of the remaining tank wastes. The demonstration phase, Phase 1 of the project, is further subdivided into two parts, A and B. During Phase 1A, the vitrification contractors are to establish the technical, operational, regulatory, business, and financial elements required to provide treatment services on a fixed unit price basis. Phase 1A deliverables will be evaluated by RL to determine whether it is in the best interest of the government to have one or more vitrification contractors proceed with Phase 1B, in which 6% to 13% of the tank waste would be treated in the demonstration. In addition, before RL can authorize proceeding with Phase 1B, the PHMC team must demonstrate its readiness to retrieve and deliver the waste to the private contractor(s) and to receive and dispose of the products and by-products returned from the treatment. The PHMC team has organized their plans for providing these vitrification-support services into the Retrieval and Disposal Mission within the Tank Waste Remediation System (TWRS) Project. Three RL core teams were established to assist in evaluating the PHMC team`s readiness specifically in regard to three task areas: Waste feed delivery; Infrastructure and by-products delivery; and Immobilized products. The core teams each developed a set of criteria and plans to be used in evaluating the PHMC team`s readiness to proceed (RTP).

Hall, C.E.

1998-01-06T23:59:59.000Z

396

Standards Coordination Office Homepage  

Science Conference Proceedings (OSTI)

Standards Coordination Office. ... About the Standards Coordination Office (SCO). The Standards Coordination Office of the ...

2013-07-31T23:59:59.000Z

397

The Standards Forum, February 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume 3, Number 2 - September 1995 The Standards News on the DOE Technical Standards Program Forum ISO 14000 - An Update Article contributed by Mary McKiel, U.S. Environmental Protection Agency The International Organization for Standardization (ISO) is developing Environmental Management Stan- dards through ISO Technical Commit- tee (TC) 207. The standards are known as the "ISO 14000" series. 1 The standards will cover a broad array of environmental topics including environmental management systems, eco-labeling, life cycle assessment, environment performance evaluation indicators, and environmental aspects in product standards. The standards are management based, not performance based, and are intended to be applicable to virtually all sectors from manufacturing

398

STANDARD REFERENCE  

E-Print Network (OSTI)

The profession is strongly urged to use the standard reference on the financial framework in the EU, concerning endorsed IFRS in order to give a clear message to the market and to users of financial statements in and outside the EU.

unknown authors

2005-01-01T23:59:59.000Z

399

Interconnection Standards (Utah) | Open Energy Information  

Open Energy Info (EERE)

utilities, electric cooperatives External Disconnect Switch Not required for inverter-based systems 10 kW or less; required for all other systems Insurance Requirements...

400

Report of the Federal Internetworking Requirements Panel  

SciTech Connect

The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

1994-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Renewable Portfolio Standards - Energy Efficiency Component | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Portfolio Standards - Energy Efficiency Component Renewable Portfolio Standards - Energy Efficiency Component Renewable Portfolio Standards - Energy Efficiency Component < Back Eligibility Investor-Owned Utility Municipal Utility Retail Supplier Program Info State Connecticut Program Type Energy Efficiency Resource Standard Provider Public Utilities Regulatory Authority Established in 1998 and subsequently revised several times, Connecticut's renewables portfolio standard (RPS) requires each electric supplier and each electric distribution company wholesale supplier to obtain at least 23% of its retail load by using renewable energy by January 1, 2020. Specific to energy efficiency, the RPS also requires each electric supplier and each electric distribution company wholesale supplier to obtain at least 4% of its retail load by using combined heat and power (CHP) systems

402

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

403

Hydrogen Codes and Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Codes and Standards Codes and Standards James Ohi National Renewable Energy Laboratory 1617 Cole Blvd. Golden, CO 80401 Background The development and promulgation of codes and standards are essential if hydrogen is to become a significant energy carrier and fuel because codes and standards are critical to establishing a market-receptive environment for commercializing hydrogen-based products and systems. The Hydrogen, Fuel Cells, and Infrastructure Technologies Program of the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL), with the help of the National Hydrogen Association (NHA) and other key stakeholders, are coordinating a collaborative national effort by government and industry to prepare, review, and promulgate hydrogen codes and standards needed to expedite hydrogen infrastructure development. The

404

Functional requirements for a collaborative platform for power transmission system operators: the case of South Eastern Europe  

Science Conference Proceedings (OSTI)

The economic development and the use of technology have led the developed and developing countries to an increasing demand for electrical power to fuel their activities. To respond in that challenge, transmission system operators should be provided with ... Keywords: distribution management system, electrical market management system, energy management system, supervisory control and data acquisition, transmission grids

P. Krommydakis; P. Karampelas; K. Xilogiannopoulos; L. Ekonomou

2011-04-01T23:59:59.000Z

405

Instrumentation and Control, Human System Interface, and Information Technology Requirements Project Plan for Nuclear Power Plant Lo ng-Term Operation  

Science Conference Proceedings (OSTI)

Nuclear power plant owners are looking to extend the operating life of their plants to 80 years and potentially longer. Instrumentation and control, human system interface, and information technologies have changed drastically since the plants were built and will change even more drastically before the plants reach the end of their operating life. A project plan to develop requirements for these technologies is defined here. These requirements will enable plants to better identify future solutions that w...

2010-02-03T23:59:59.000Z

406

Effect of building airtightness and fan size on the performance of mechanical ventilation systems in new U.S. houses: a critique of ASHRAE standard 62.2-2003  

E-Print Network (OSTI)

pg 4. 2000c. Industry News: Vermont to Require Mechanicalpgs 816-827. ICCI. 2003. Vermont Residential Building EnergyNew Construction in Vermont: A Review of Codes, Standards,

Roberson, J.

2004-01-01T23:59:59.000Z

407

Report on Applicability of Residential Ventilation Standards in California  

E-Print Network (OSTI)

combustion appliances. The standard also requires an air inlet and glass doors for fireplaces, wood,

Sherman, Max H.; McWilliam, Jennifer A.

2005-01-01T23:59:59.000Z

408

Energy Standard  

Gasoline and Diesel Fuel Update (EIA)

Hall Hall October 2011 Analysis of Impacts of a Clean www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the U.S. Department of Energy or other Federal agencies. U.S. Energy Information Administration | Analysis of Impacts of a Clean Energy Standard as requested by Chairman Hall i Contacts This report, Analysis of Impacts of a Clean Energy Standard as requested by Chairman Hall, was prepared under the

409

Energy Standard  

Gasoline and Diesel Fuel Update (EIA)

Bingaman Bingaman November 2011 Analysis of Impacts of a Clean www.eia.gov U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the U.S. Department of Energy or other Federal agencies. U.S. Energy Information Administration | Analysis of Impacts of a Clean Energy Standard as requested by Chairman Bingaman i Contacts This report, Analysis of Impacts of a Clean Energy Standard, as requested by Chairman Bingaman, was prepared

410

ARCHITECTURAL AND CIVIL STANDARDS  

SciTech Connect

Hanford Atomic Production Operation specification guides and standards for architectural and civil engineering are presented. Information includes construction of roads, railroads, roofs, signs, buildings, building equipment, sewers, fences, safety systems, and drainage systems. Details of this manual are given in TID-4100 (Suppl.). (N.W.R.)

1963-01-01T23:59:59.000Z

411

Standard Elements  

Science Conference Proceedings (OSTI)

Table 1   ASTM standards applicable to element-level testing of composites...Composite Plates Subjected to a Distributed Load Plate flexure D 6484 Open-Hole Compression Strength of Polymer Matrix Composites Open-hole compression strength Z 5370Z Compression After Impact Strength of Fiber-Resin Composites Compression after impact Z 7225Z Mixed Mode I-Mode II...

412

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

413

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

414

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

415

DOE standard: Integration of environment, safety, and health into facility disposition activities. Volume 1: Technical standard  

Science Conference Proceedings (OSTI)

This Department of Energy (DOE) technical standard (referred to as the Standard) provides guidance for integrating and enhancing worker, public, and environmental protection during facility disposition activities. It provides environment, safety, and health (ES and H) guidance to supplement the project management requirements and associated guidelines contained within DOE O 430.1A, Life-Cycle Asset Management (LCAM), and amplified within the corresponding implementation guides. In addition, the Standard is designed to support an Integrated Safety Management System (ISMS), consistent with the guiding principles and core functions contained in DOE P 450.4, Safety Management System Policy, and discussed in DOE G 450.4-1, Integrated Safety Management System Guide. The ISMS guiding principles represent the fundamental policies that guide the safe accomplishment of work and include: (1) line management responsibility for safety; (2) clear roles and responsibilities; (3) competence commensurate with responsibilities; (4) balanced priorities; (5) identification of safety standards and requirements; (6) hazard controls tailored to work being performed; and (7) operations authorization. This Standard specifically addresses the implementation of the above ISMS principles four through seven, as applied to facility disposition activities.

NONE

1998-05-01T23:59:59.000Z

416

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

417

The development of broadband satellite interactive access system based on DVB-S2 and mobile DVB-RCS standard  

Science Conference Proceedings (OSTI)

In this paper, the MoBISAT (Mobile Broadband Interactive Satellite Access Technology) system, the BcSAT (Broadband adaptive satellite communicationS and broadcAsting convergence Technology) system and the STC (Satellite and Terrestrial Convergence) system ... Keywords: BcSAT, DVB-S2, MoBISAT, STC, broadband mobile service, mobile DVB-RCS

Pansoo Kim; Dae-Ig Chang; Ho-Jin Lee

2007-01-01T23:59:59.000Z

418

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State New York Program Type Interconnection Provider New York State Department of Public Service New York first adopted uniform interconnection standards in 1999 (see history below). The Standard Interconnection Requirements (SIR) have subsequently been amended several times since, most recently with the adoption of far reaching revisions in February 2009. Several more minor

419

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Industrial Institutional Nonprofit Residential Schools Utility Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Program Info State Colorado Program Type Interconnection Provider Colorado Public Utilities Commission In December 2005, the Colorado Public Utilities Commission (PUC) adopted standards for net metering and interconnection, as required by Amendment 37, a renewable-energy ballot initiative approved by Colorado voters in November 2004. The PUC standards generally apply to utilities with 40,000 or more customers and all cooperative utilities.*

420

Medical Application Platform Apps Requirements Engineering Brian Larson, John Hatcliff, Sam Procter, Patrice Chalin  

E-Print Network (OSTI)

Medical Application Platform Apps Requirements Engineering Brian Larson, John Hatcliff, Sam Procter agency guidance documents and process standards for medical devices (i.e., IEC 62304) generally consider medical devices to be stand-alone monolithic systems. The format and content of a system requirements

Huth, Michael

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

December 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Standards Forum & Standards Actions Page 1 December 2007 The Standards Forum & Standards Actions Page 1 December 2007 Continued on next page Technical Standards Program Manager's Note 1 Teaching Standards Development- Inspiring the Next Generation 2 The EPA Radiation Standard for Spent-Fuel Storage in a Geological Repository 3 Expanded Access to Hydrogen Codes and Standards 4 Really Following the Building Code 6 Technical Standards Manager Spotlight 7

422

Audit of Departmental Integrated Standardized Core Accounting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit of Departmental Integrated Standardized Core Accounting System (DISCAS) Operations at Selected Field Sites, AP-FS-97-02 Audit of Departmental Integrated Standardized Core...

423

EVMS Surveillance Standard Operating Procedure (ESSOP) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reporting System (PARS II) INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures ICR-ICE Standard Operating Procedures (Update Sept 2013)...

424

NIST Global Standards Information China  

Science Conference Proceedings (OSTI)

... Systems was held in Shanghai, China on June ... to address topics on standards for renewable energy and ... of interest to both US and Chinese experts ...

425

Brochure Hydraulic Institute Standards Overview  

Energy.gov (U.S. Department of Energy (DOE))

If you specify, select, design, test, install or operate pumps or pumping systems, you will find ANSI/HI Pump Standards to be invaluable tools. 

426

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Functional modules F1--F8 -- Volume 2, Part 1, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. The manual is divided into three volumes: Volume 1--for the control module documentation; Volume 2--for functional module documentation; and Volume 3--for documentation of the data libraries and subroutine libraries.

Greene, N.M.; Petrie, L.M.; Westfall, R.M.; Bucholz, J.A.; Hermann, O.W.; Fraley, S.K. [Oak Ridge National Lab., TN (United States)

1995-04-01T23:59:59.000Z

427

Lower-Energy Requirements for Power-Assist HEV Energy Storage Systems--Analysis and Rationale (Presentation)  

SciTech Connect

Presented at the 27th International Battery Seminar and Exhibit, 15-18 March 2010, Fort Lauderdale, Florida. NREL conducted simulations and analysis of vehicle test data with research partners in response to a USABC request; results suggest that power-assist hybrid electric vehicles (HEVs), like conventional HEVs, can achieve high fuel savings with lower energy requirements at potentially lower cost.

Gonder, J.; Pesaran, A.

2010-03-18T23:59:59.000Z

428

Integrating usability requirements that can be evaluated in design time into Model Driven Engineering of Web Information Systems  

Science Conference Proceedings (OSTI)

In recent years, Web Engineering development projects have grown increasingly complex for and critical to the smooth running of organizations. However, recent studies reveal that a high percentage of these projects fail to attain the quality parameters ... Keywords: Requirements metamodelling, Software quality, Usability evaluation, Web engineering

Fernando Molina; Ambrosio Toval

2009-12-01T23:59:59.000Z

429

Minimum Gas Service Standards (Ohio)  

Energy.gov (U.S. Department of Energy (DOE))

Natural gas companies in Ohio are required to follow the Minimum Gas Service Standards, which are set and enforced by the Public Utilities Commission of Ohio. These rules are found in chapter 4901...

430

EIA - AEO2010 - CAFE standards  

Annual Energy Outlook 2012 (EIA)

economy requirement of 34.1 mpg by 2016. Because the CO2-equivalent standards cover all vehicle emissions related to GHGs, manufacturers who do not implement technologies that...

431

The Standards Actions, January 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions Actions Resistance of HVAC Air Ducts and Fittings (new standard); comments due February 6, 1996. * ISO/ASQC A3534-1, Statis- tics - Vocabulary and Sym- bols - Probability and Gen- eral Statistical Terms (new standard); comments due January 26, 1996. * ISO/ASTM/ASQC/NSF 14004, Environmental management systems - General guidelines on principles, systems and Technical Standards Program Document Status as of 12/31/95 Documents Recently Published The Technical Standards Program is sponsoring a project at OSTI to place all DOE technical standards (i.e., standards and handbooks) on the Internet. To date, 57 DOE technical standards have been placed on the Internet at the following address: http://apollo.osti.gov/ html/techstds/ techstds.html The following DOE technical standards have recently

432

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Wind Energy Sources Solar Home Weatherization Program Info State District of Columbia Program Type Interconnection Provider Washington Utilities and Transportation Commission In September 2007, the Washington Utilities and Transportation Commission (UTC) adopted interconnection standards for distributed generation (DG) systems up to 20 megawatts (MW) in capacity. The revised standards provide for two separate levels of interconnection based on system capacity. The

433

Standards for ICCP API  

Science Conference Proceedings (OSTI)

This report reflects an update to the original 12/99 EPRI Report TE-114613 and the current status of the standard as of 6/30/00. The Inter-Control Center Communication Protocol (ICCP) was developed as an EPRI project for the exchange of power system information between control centers, or between a control center and a generation control system or substation. ICCP is now an international standard IEC 60870-6 known as Telecontrol Application Service Element 2 (TASE.2) (See Reference 1-3). However, the App...

2000-08-03T23:59:59.000Z

434

Hydrogen Vehicle and Infrastructure Codes and Standards Citations (Brochure), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Hydrogen Vehicle and Infrastructure Codes and Standards Citations Hydrogen Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. hydrogen vehicle and infrastructure projects. To determine which codes and standards apply to a specific project, identify the codes and standards currently in effect within the jurisdiction where the project will be located. Some jurisdictions also have unique ordinances or regulations that could apply. Learn about codes and standards basics at www.afdc.energy.gov/afdc/codes_standards_basics.html. Find hydrogen vehicle and infrastructure codes and standards in these categories: * Annual Inspections and Approvals * General Station Requirements * Gaseous Hydrogen Storage, Compression, and Generation Systems * Liquefied Hydrogen Storage Systems

435

May 2007 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 2

436

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

437

An hourly-based performance comparison of an integrated micro-structural perforated shading screen with standard shading systems  

E-Print Network (OSTI)

protection with sun-shading systems, Solar Energy 69 (Suppl.total solar energy transmittance of the CFSs with sun pathbecause the sun altitude is also higher. The solar gains can

Appelfeld, David

2013-01-01T23:59:59.000Z

438

An hourly-based performance comparison of an integrated micro-structural perforated shading screen with standard shading systems  

E-Print Network (OSTI)

complex fenestration systems, Solar Energy, submitted foron prismatic glazing, Solar Energy 74 (2003) 157–173. [13]of glazings and windows, Solar Energy 69 (Suppl. 1–6) (2000)

Appelfeld, David

2013-01-01T23:59:59.000Z

439

Catalog of Standards  

Science Conference Proceedings (OSTI)

... Catalog of Standards. ... As of May 2013, the number of standards or standards components added to the Catalog of Standards stands at 56. ...

2013-07-31T23:59:59.000Z

440

Performance Optimization of a Fan System- Overcoming Impacts of Modified Design Criteria Due to Regulatory Requirements and Changed Operating Conditions  

E-Print Network (OSTI)

The Louisiana Pacific mill in Tomahawk Wisconsin manufactures oriented-strand board. Several large induced-draft fans and combustion-air blowers were operating inefficiently at this mill. This case study highlights a systems approach that was applied to address fan inefficiency. Energy savings from optimizing the system are estimated to be 338 kW, nearly half of the original measured input power of 678 kW. The project is currently being implemented and will have a payback period of less than 8 months. The opportunities here are typical of opportunities thought to exist in most industrial plants. In this case, process needs changed due to environmental regulations and change of location, but the system did not, leading to low overall system efficiency.

Wroblewski, R. G.; Preis, F.; Smith, R.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Setting the Standard for Industrial Energy Efficiency  

E-Print Network (OSTI)

Netherlands has an Energy Management System, not a standard,LTAs and must use the Energy Management System. The 150 mostinvolvement. The energy management system (introduced as a

McKane, Aimee; Williams, Robert; Perry, Wayne; Li, Tienan

2008-01-01T23:59:59.000Z

442

The Development of a Human Systems Simulation Laboratory at Idaho National Laoboratory: Progress, Requirements and Lessons Learned  

SciTech Connect

Next generation nuclear power plants and digital upgrades to the existing nuclear fleet introduce potential human performance issues in the control room. Safe application of new technologies calls for a thorough understanding of how those technologies affect human performance and in turn, plant safety. In support of advancing human factors for small modular reactors and light water reactor sustainability, the Idaho National Laboratory (INL) has developed a reconfigurable simulation laboratory capable of testing human performance in multiple nuclear power plant (NPP) control room simulations. This paper discusses the laboratory infrastructure and capabilities, the laboratory’ s staffing requirements, lessons learned, and the researcher’s approach to measuring human performance in the simulation lab.

David I Gertman; Katya L. LeBlanc; William phoenix; Alan R Mecham

2010-11-01T23:59:59.000Z

443

National Green Building Standard Analysis  

SciTech Connect

DOE's Building America Program is a research and development program to improve the energy performance of new and existing homes. The ultimate goal of the Building America Program is to achieve examples of cost-effective, energy efficient solutions for all U.S. climate zones. Periodic maintenance of an ANSI standard by review of the entire document and action to revise or reaffirm it on a schedule not to exceed five years is required by ANSI. In compliance, a consensus group has once again been formed and the National Green Building Standard is currently being reviewed to comply with the periodic maintenance requirement of an ANSI standard.

NAHB Research Center, Upper Marlboro, Maryland

2012-07-01T23:59:59.000Z

444

Report on Applicability of Residential Ventilation Standards in California  

E-Print Network (OSTI)

Annual Book of ASTM Standards. Vol. 04.11. American SocietyCalifornia's Energy Efficiency Standards for Residential andSystems" Canadian Standards Association, Mississauga,

Sherman, Max H.; McWilliam, Jennifer A.

2005-01-01T23:59:59.000Z

445

SAFETY-MECHANICAL STANDARDS  

SciTech Connect

Hanford Atomic Production Operation specification guides and standards for plumbing, chemical ngineering, mechanical engineering, sanitary engineering, exhaust systems, steam engineering, stainless steel, dry boxes, thermal insulation, filtration, and materials testing are presented. Details of this manual are given in TID-4100 (Suppl.). (N.W.R.)

1964-10-31T23:59:59.000Z

446

Use of econometrics in analysing the national educational system of Romania according to the standards of the European Union  

Science Conference Proceedings (OSTI)

Defining the pre-university educational institution as fundamental unit of the national preuniversity educational system takes into account the social function of the pre-university educational institution in relation to the structures this can define ... Keywords: assembly of interaction variables, cybernetic model, econometric model, input vector, output vector, status vector

Ioan Constantin Dima; Mariana Man; Ciureu Vergil; Marius Petrescu; Laurentiu Baranga; Nicolaie N?bârjoiu

2010-07-01T23:59:59.000Z

447

The Standards Forum, June 2002  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How the DOE Technical Standards Program How the DOE Technical Standards Program Supports DOE's Integrated Safety Management System By Rick Serbu, DOE Technical Standards Program Manager Have a safe summer season! How the DOE Technical Stan- dards Program Supports DOE's Integrated Safety Management System 1 Reaffirmation of DOE Technical Standards: What is the Proper Process? 1 Welcome Aboard the TSMC! 5 Nine Years and Counting! 6 "Standards Mean Business" Chosen as 2002 World Stan- dards Day Theme 6 Standards Actions 8 DOE Topical Committees on Metrology and Accreditation Hold Annual Combined Meeting 14 ASME Issues Companion Guide To ASME Boiler and Pressure Vessel Code 15 The World of Standards-News Briefs 16 Upcoming Meetings and Conferences of Interest 19 Inside this issue:

448

ASHRAE Standard 62-1989: Energy, Cost, and Program Implications.  

SciTech Connect

ASHRAE Standard 62-1989 (Standard 62-89) Ventilation for Acceptable Indoor Air Quality'' is the new heating, ventilating, and air-conditioning (HVAC) industry consensus for ventilation air in commercial buildings. Bonneville Power Administration (Bonneville) references ASHRAE Standard 62-81 (the predecessor to Standard 62-89) in their current environmental documents for required ventilation rates. Through its use, it had become evident to Bonneville that Standard 62-81 needed interpretation. Now that the revised Standard (Standard 62-89) is available, its usefulness needs to be evaluated. Based on current information and public comment, the American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE) revised Standard 62-1981 to Standard 62-89. Bonneville's study estimated the energy and cost implications of ASHRAE Standard 62-89 using simulations based on DOE-2.1D, a computer simulation program which estimates building use hourly as a function of building characteristics and climatic location. Ten types of prototypical commercial buildings used by Bonneville for load forecasting purposes were examined: Large and Small Office, Large and Small Retail, Restaurant, Warehouse, Hospital, Hotel, School, and Grocery. These building characterizations are based on survey and energy metering data and represent average or typical construction and operation practices and mechanical system types. Prototypical building ventilation rates were varied in five steps to estimate the impacts of outside air on building energy use. 11 refs., 14 tabs.

Steele, Tim R.; Brown, Marilyn A.

1990-10-15T23:59:59.000Z

449

ASHRAE Standard 62-1989: Energy, Cost, and Program Implications.  

SciTech Connect

ASHRAE Standard 62-1989 (Standard 62-89) Ventilation for Acceptable Indoor Air Quality'' is the new heating, ventilating, and air-conditioning (HVAC) industry consensus for ventilation air in commercial buildings. Bonneville Power Administration (Bonneville) references ASHRAE Standard 62-81 (the predecessor to Standard 62-89) in their current environmental documents for required ventilation rates. Through its use, it had become evident to Bonneville that Standard 62-81 needed interpretation. Now that the revised Standard (Standard 62-89) is available, its usefulness needs to be evaluated. Based on current information and public comment, the American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE) revised Standard 62-1981 to Standard 62-89. Bonneville's study estimated the energy and cost implications of ASHRAE Standard 62-89 using simulations based on DOE-2.1D, a computer simulation program which estimates building use hourly as a function of building characteristics and climatic location. Ten types of prototypical commercial buildings used by Bonneville for load forecasting purposes were examined: Large and Small Office, Large and Small Retail, Restaurant, Warehouse, Hospital, Hotel, School, and Grocery. These building characterizations are based on survey and energy metering data and represent average or typical construction and operation practices and mechanical system types. Prototypical building ventilation rates were varied in five steps to estimate the impacts of outside air on building energy use. 11 refs., 14 tabs.

Steele, Tim R.; Brown, Marilyn A.

1990-10-15T23:59:59.000Z

450

Interconnection Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Standards Interconnection Standards Interconnection Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Commercial Heating & Cooling Manufacturing Buying & Making Electricity Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Energy Sources Solar Wind Program Info State Maryland Program Type Interconnection Provider Maryland Public Service Commission In April 2007, Maryland enacted legislation ([http://mgaleg.maryland.gov/2007RS/chapters_noln/Ch_119_sb0595E.pdf S.B. 595]) requiring the Maryland Public Service Commission (PSC) to form a small generator interconnection working group to develop interconnection standards and procedures that are "consistent with nationally adopted

451

High Availability Electronics Standards  

Science Conference Proceedings (OSTI)

Availability modeling of the proposed International Linear Collider (ILC) predicts unacceptably low uptime with current electronics systems designs. High Availability (HA) analysis is being used as a guideline for all major machine systems including sources, utilities, cryogenics, magnets, power supplies, instrumentation and controls. R&D teams are seeking to achieve total machine high availability with nominal impact on system cost. The focus of this paper is the investigation of commercial standard HA architectures and packaging for Accelerator Controls and Instrumentation. Application of HA design principles to power systems and detector instrumentation are also discussed.

Larsen, R.S.; /SLAC

2006-12-13T23:59:59.000Z

452

A method for calculation of margins to voltage instability applied on the Norwegian system for maintaining required security level  

SciTech Connect

The paper describes a method for calculating margins to voltage instability. The method is based on sensitivity techniques. The measure to voltage instability can be given in terms of MW, MVAr or MVA depending on the components in the increase in load. The extensions to earlier publications of the method are the ability to increase the load and generation simultaneously on several buses without increasing the computation time. A single forward and backward substitution is sufficient to find the required sensitivities when the load is increased. The productions of the plant can be increased either by a specified profile or by using the turbine droop characteristics. A method for identification of contingencies needing an explicit reserve evaluation is briefly described.

Flataboe, N.; Fosso, O.B.; Ognedal, R.; Carlsen, T.; Heggland, K.R.

1993-08-01T23:59:59.000Z

453

The Standards Forum, September 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 – September 1999 2 – September 1999 PAGE 1 The Standards News on the DOE Technical Standards Program A Note From the Manager ............. 2 TSM Spotlight ........................... 3 TSM Spotlight ................................ 4 Topical Committees ....................... 5 Standards Actions .......................... 7 News Briefs ................................... 11 FAQs ............................................. 14 Upcoming Meetings ....................... 15 TSMC Telecons ............................. 16 Volume 7 – Number 2 – September 1999 Savannah River Targets Cost Savings Through Standards Reduction By Art Blanchard, Savannah River Site In 1995, the Savannah River Site (SRS) initi- ated a cost-effective task to have the site’s standards system mandate usage of national codes and stan-

454

Improving the Usability and Accessibility of Voting Systems ...  

Science Conference Proceedings (OSTI)

... ble standards are at the system under test conforms. Usability testing is mainly reserved for general usability requirements that cannot ... nts ...

2010-03-19T23:59:59.000Z

455

Federal Information Processing Standards  

Science Conference Proceedings (OSTI)

... Federal Information Processing Standards Publications (FIPS PUBS). ... Replacement Standards for Withdrawn FIPS on Geographic Codes.

2013-07-30T23:59:59.000Z

456

March 2007 Standards Forum and Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2007 March 2007 Continued on next page TSP Manager's Notes 1 Domestic Programs (American National Standards) Overview 2 Aerospace Industry Advocates Standards Selection Based on Technical Merit, Not Semantics 3 Report Recommends Withdrawal of OMB Risk Assessment Bulletin 4 Technical Standards Manager Spotlight 5 Topical Committee Developments 6 Welcome Aboard the TSMC! 7 Standards Actions 8 DOE Standards Actions 8

457

Carbon Monoxide, Ozone, Hydrocarbon Air Quality Standards, and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carbon Monoxide, Ozone, Hydrocarbon Air Quality Standards, and Related Emission Requirements (Ohio) Carbon Monoxide, Ozone, Hydrocarbon Air Quality Standards, and Related Emission...

458

Proposed procedure for exemption from the requirement for segregated ballast tanks (SBT), dedicated clean ballast tanks (CBT), or a crude oil washing (COW) system for existing tank vessels  

SciTech Connect

A proposed procedure for exemption from the requirement for segregated ballast tanks (SBT), dedicated clean ballast tanks (CBT), or a crude oil washing (COW) system for existing tank vessels of 40,000 dwt and over, in domestic trade has been issued by the US Coast Guard under the Port and Tanker Safety Act. Exemption would be allowed if shore-based reception facilities are a preferred method of handling dirty ballast and if such facilities are adequate and readily available. Adoption of the proposal would recognize that in certain trades where existing tank vessels have set loading locations, it is as effective to use shore-based reception facilities for the treatment of oil residues as it is to use SBT, CBT, or COW. The proposal requires, among others, National Pollutant Discharge Elimination System permits for the reception facilities, and contains a provision for revocation of exemptions upon noncompliance with regulations. Comments must be received by 7/7/80.

1980-05-22T23:59:59.000Z

459

DOE Standard 1020 - Natural Phenomena Hazard analysis and Design Criteria  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Standard 1020 - Natural Phenomena Hazard analysis and Design DOE Standard 1020 - Natural Phenomena Hazard analysis and Design Criteria for DOE Facilities DOE Standard 1020 - Natural Phenomena Hazard analysis and Design Criteria for DOE Facilities Department of Energy (DOE) Standard (STD)-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities, provides criteria and guidance for the analysis and design of facility structures, systems, and components (SSCs) that are necessary to implement the requirements of DOE Order (O) 420.1C, Facility Safety, and to ensure that the SSCs will be able to effectively perform their intended safety functions under the effects of natural phenomena hazards (NPHs). This Standard also provides criteria and guidance for the use of industry building codes and voluntary

460

Standards for Protection Against Radiation (Michigan)  

Energy.gov (U.S. Department of Energy (DOE))

This rule establishes standards for protection against radiation hazards. In addition to complying with requirements set forth, every reasonable effort should be made to maintain radiation levels...

Note: This page contains sample records for the topic "requirements systems standards" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Building Technologies Office: About Standards  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards Standards Learn more about: History of Federal Appliance Standards How to Get Involved We rely on our appliances every day to cook and refrigerate our food, clean our clothes, heat our water, and perform many other daily tasks. But most of us take our appliances and the energy and water they use for granted. The operating cost of an appliance over its lifetime may be several times greater than its initial purchase price. Many consumers do not consider energy or water efficiency when making their purchases. But looking for an energy efficient model can save you money over the long run. Congress passed laws setting initial federal energy efficiency standards and establishing schedules for the U.S. Department of Energy (DOE) to review and revise these standards. Standards benefit consumers by requiring that appliance manufacturers reduce the energy and water use of their products-and thus the costs to operate them.

462

Electric Vehicle Charging Levels and Requirements Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and certification Safety standards and certification * Charging definitions * EVSE ( (electric vehicle supp pp y ly eq quip pment) ) examp ples * Installation requirements * Siting...

463

Building Technologies Office: Standards and Test Procedures  

NLE Websites -- All DOE Office Websites (Extended Search)

Standards and Test Standards and Test Procedures to someone by E-mail Share Building Technologies Office: Standards and Test Procedures on Facebook Tweet about Building Technologies Office: Standards and Test Procedures on Twitter Bookmark Building Technologies Office: Standards and Test Procedures on Google Bookmark Building Technologies Office: Standards and Test Procedures on Delicious Rank Building Technologies Office: Standards and Test Procedures on Digg Find More places to share Building Technologies Office: Standards and Test Procedures on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR® Popular Links Success Stories Previous Next Lighten Energy Loads with System Design. Learn More.

464

Energy Efficiency Standards for Refrigerators in Brazil: A Methodology for  

Open Energy Info (EERE)

Energy Efficiency Standards for Refrigerators in Brazil: A Methodology for Energy Efficiency Standards for Refrigerators in Brazil: A Methodology for Impact Evaluation Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Efficiency Standards for Refrigerators in Brazil: A Methodology for Impact Evaluation Focus Area: Energy Efficiency Topics: Potentials & Scenarios Website: www.scribd.com/doc/34712276/Energy-efficiency-standards-for-refrigerat Equivalent URI: cleanenergysolutions.org/content/energy-efficiency-standards-refrigera Language: English Policies: Regulations Regulations: "Appliance & Equipment Standards and Required Labeling,Emissions Standards" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

465

Site Lead TQP Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualification Standard for the Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program May 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy 1 Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program A Site Lead is an individual, normally at a senior General Schedule (GS) level or Excepted Service, who is assigned the responsibility to assess and evaluate management systems, safety and health programs, and technical activities associated with U.S. Department of Energy (DOE) nuclear and non-nuclear facilities. Typically, a Site Lead has previously qualified as a Nuclear Safety Specialist or a Senior Technical Safety Manager. For exceptionally qualified individuals,

466

August 1999 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

this document is available on the this document is available on the Technical Standards Program (TSP) Internet Site at the URL shown at the bottom of this page. If you wish to comment on this document, please notify your TSM. * Design Criteria Standard for Electronic Records Manage- ment Software, Project Number INFT-0001; Carol Blackston, MA-42; 301-903-4294, FAX 301- 903-4101; Carol.Blackston @hq.doe.gov. Comments are due August 30, 1999. This stan- dard was adapted from the De- partment of Defense standard 5015.2 and tailored for specific DOE use. DOE Documents Recently Published The following DOE document has recently been published: * DOE-HDBK-3027-99, Integrated Safety Management Systems (ISMS) Verification - Team Leader's Handbook, June 1999. DOE employees and DOE contractors may obtain copies from the

467

Policy Analysis Modeling System (PAMS) | Open Energy Information  

Open Energy Info (EERE)

Analysis Modeling System (PAMS) Analysis Modeling System (PAMS) (Redirected from Policy Analysis Modeling System) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Policy Analysis Modeling System Agency/Company /Organization: Lawrence Berkeley National Laboratory Sector: Energy Focus Area: Buildings, Energy Efficiency Topics: Policies/deployment programs Resource Type: Software/modeling tools User Interface: Spreadsheet Website: clasponline.org/ResourcesTools/Tools/PolicyAnalysisModelingSystem Equivalent URI: cleanenergysolutions.org/content/policy-analysis-modeling-system-pams Regulations: "Appliance & Equipment Standards and Required Labeling,Net Metering & Interconnection" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

468

Solar Construction Permitting Standards (California) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards (California) Standards (California) Solar Construction Permitting Standards (California) < Back Eligibility Commercial Industrial Local Government Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Solar/Wind Permitting Standards Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base the fee for a solar permit on the value of the solar system or the value of the property on which the system will be installed. It also requires the local government to separately identify every fee charged on the invoice provided to the

469

Statewide Renewable Energy Setback Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statewide Renewable Energy Setback Standards Statewide Renewable Energy Setback Standards Statewide Renewable Energy Setback Standards < Back Eligibility Agricultural Commercial Fed. Government Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info State Illinois Program Type Solar/Wind Permitting Standards Provider Illinois State University While Illinois does not have a model wind ordinance* in place, it has established a maximum setback limit for wind turbines.** State law has established that no municipality or county government may require a wind turbine (or other renewable energy system) used for onsite energy generation to be setback more than 1.1 times the height of the system from

470

Biodiesel Vehicle and Infrastructure Codes and Standards Citations (Brochure), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Vehicle and Infrastructure Codes and Standards Citations Biodiesel Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. biodiesel vehicle and infrastructure projects. To determine which codes and standards apply to a specific project, identify the codes and standards currently in effect within the jurisdiction where the project will be located. Some jurisdictions also have unique ordinances or regulations that could apply. Learn about codes and standards basics at www.afdc.energy.gov/afdc/codes_standards_basics.html. Find biodiesel vehicle and infrastructure codes and standards in these categories: * Definition and Classification of Liquids * Fire Prevention and Fire Risk Control * Building Construction Requirements * Electrical Systems

471

Ethanol Vehicle and Infrastructure Codes and Standards Citations (Brochure), NREL (National Renewable Energy Laboratory)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Vehicle and Infrastructure Codes and Standards Citations Ethanol Vehicle and Infrastructure Codes and Standards Citations This document lists codes and standards typically used for U.S. ethanol vehicle and infrastructure projects. To determine which codes and standards apply to a specific project, identify the codes and standards currently in effect within the jurisdiction where the project will be located. Some jurisdictions also have unique ordinances or regulations that could apply. Learn about codes and standards basics at www.afdc.energy.gov/afdc/codes_standards_basics.html. Find ethanol vehicle and infrastructure codes and standards in these categories: * Definition and Classification of Liquids * Fire Prevention and Fire Risk Control * Building Construction Requirements * Electrical Systems

472

Standardized radiological dose evaluations  

SciTech Connect

Following the end of the Cold War, the mission of Rocky Flats Environmental Technology Site changed from production of nuclear weapons to cleanup. Authorization baseis documents for the facilities, primarily the Final Safety Analysis Reports, are being replaced with new ones in which accident scenarios are sorted into coarse bins of consequence and frequency, similar to the approach of DOE-STD-3011-94. Because this binning does not require high precision, a standardized approach for radiological dose evaluations is taken for all the facilities at the site. This is done through a standard calculation ``template`` for use by all safety analysts preparing the new documents. This report describes this template and its use.

Peterson, V.L.; Stahlnecker, E.

1996-05-01T23:59:59.000Z

473

The Standards Forum, March 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, Number 4 - March 2001 8, Number 4 - March 2001 The Standards News on the DOE Technical Standards Program Volume 8 - Number 4 - March 2001 DOE-TSL-1 The Department of Energy (DOE) Standards Index (DOE-TSL-1) has served to identify technical standards (both Government and non-Government) and standard- ization documents used by DOE and its contractors. Each year, the Technical Standards Program Office (TSPO) uses the DOE "Explorer" system to identify new/revised DOE directives that identify (a) non-Gov- ernment standards adopted for use by reference in the directive(s), and (b) documents prepared by other Federal agencies that DOE and its contractors use as technical stan- dards (in both instances, the review focuses on non-Government stan- dards and Federal documents not previously identified and recorded by

474

May 2006 Standards Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Actions 1 Standards Actions 1 New Projects and Technical Standards in Revision 1 DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published 1 Non-Government Standards Actions 1 American National Standards Institute (ANSI) 1 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2

475

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required