National Library of Energy BETA

Sample records for requirements operating system

  1. Electric Bike Sharing--System Requirements and Operational Concepts

    SciTech Connect (OSTI)

    Cherry, Christopher; Worley, Stacy; Jordan, David

    2010-08-01

    Bike sharing is an exciting new model of public-private transportation provision that has quickly emerged in the past five years. Technological advances have overcome hurdles of early systems and cities throughout the globe are adopting this model of transportation service. Electric bikes have simultaneously gained popularity in many regions of the world and some have suggested that shared electric bikes could provide an even higher level of service compared to existing systems. There are several challenges that are unique to shared electric bikes: electric-assisted range, recharging protocol, and bike and battery checkout procedures. This paper outlines system requirements to successfully develop and deploy an electric bike sharing system, focusing on system architecture, operational concepts, and battery management. Although there is little empirical evidence, electric bike sharing could be feasible, depending on demand and battery management, and can potentially improve the utility of existing bike sharing systems. Under most documented bike sharing use scenarios, electric bike battery capacity is insufficient for a full day of operation, depending on recharging protocol. Off-board battery management is a promising solution to address this problem. Off-board battery management can also support solar recharging. Future pilot tests will be important and allow empirical evaluation of electric bikesharing system performance. (auth)

  2. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  3. SPECTR System Operational Test Report

    SciTech Connect (OSTI)

    W.H. Landman Jr.

    2011-08-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  4. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  5. Transportation System Concept of Operations

    SciTech Connect (OSTI)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level

  6. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  7. HTGR Industrial Application Functional and Operational Requirements

    SciTech Connect (OSTI)

    L. E. Demick

    2010-08-01

    This document specifies the functional and performance requirements to be used in the development of the conceptual design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to a typical industrial facility. These requirements were developed from collaboration with industry and HTGR suppliers over the preceding three years to identify the energy needs of industrial processes for which the HTGR technology is technically and economically viable. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a conceptual design of the plant that will serve the broadest range of industrial applications.

  8. Revenue Requirements Modeling System (RRMS) documentation. Volume II. Appendix D: operator's manual; Appendix E: program maintenance guide. Final report. [COMPUSTAT II

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Revenue Requirements Modeling System (RRMS) is a utility specific financial modeling System used by the Energy Information Administration (EIA) to evaluate the impact on electric utilities of changes in the regulatory, economic and tax environments. Included in the RRMS is a power plant life-cycle revenue requirements model designed to assess the comparative economic advantage of alternative generating plant. This report is Volume II of a 2 volume set and provides a programmer's guide which describes new user initialization procedures and data base update procedures. This report also provides a software maintenance guide which contains listings of all computer code for the models. Volume I provides a methodology description and user's guide, a model abstract and technical appendix, and sample input and output for the models.

  9. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirementís Baseline, but also the development of all your individual requirements during a Programís/Projectís Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirementsí development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  10. Superconducting Super Collider Magnet System requirements. Revision A

    SciTech Connect (OSTI)

    1986-10-23

    This report discusses the Superconducting Super Collider magnet system requirements when the following categories: Functions; operational performance requirements; system configuration and essential features; structural requirements; availability/reliability; instrumentation and control requirements; design life; environment; maintenance requirements; interface systems; quality assurance; safety; and applicable codes and standards.

  11. Washington DC Reliability Requirements and the Need to Operate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) ...

  12. Midcontinent Independent System Operator, Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Midcontinent Independent System Operator, Inc. 317.249-5400 www.misoenergy.org PO Box 4202 ... Inc. 317.249-5400 www.misoenergy.org PO Box 4202 Carmel, Indiana 46037 2985 Ames ...

  13. An operational subsea wireline system

    SciTech Connect (OSTI)

    Dines, C.; Cowan, P.; Headworth, C.

    1989-02-01

    This paper describes an operational subsea wireline system that is self-contained and flexible and offers a safe, economical, and proven method for riserless re-entry into any subsea well.

  14. Fuel Requirements for HCCI Engine Operation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for HCCI Engine Operation Fuel Requirements for HCCI Engine Operation 2002 DEER Conference Presentation: Southwest Research Institute 2002_deer_ryan.pdf (998.12 KB) More Documents & Publications HCCI - A Technical Review and Progress Report 2006 Multidimensional simulation and chemical kinetics development for high efficiency clean combustion engines Chemical Kinetic Research on HCCI & Diesel Fuels

  15. Electronic Medical Business Operations System

    SciTech Connect (OSTI)

    Cannon, D. T.; Metcalf, J. R.; North, M. P.; Richardson, T. L.; Underwood, S. A.; Shelton, P. M.; Ray, W. B.; Morrell, M. L.; Caldwell, III, D. C.

    2012-04-16

    Electronic Management of medical records has taken a back seat both in private industry and in the government. Record volumes continue to rise every day and management of these paper records is inefficient and very expensive. In 2005, the White House announced support for the development of electronic medical records across the federal government. In 2006, the DOE issued 10 CFR 851 requiring all medical records be electronically available by 2015. The Y-12 National Security Complex is currently investing funds to develop a comprehensive EMR to incorporate the requirements of an occupational health facility which are common across the Nuclear Weapons Complex (NWC). Scheduling, workflow, and data capture from medical surveillance, certification, and qualification examinations are core pieces of the system. The Electronic Medical Business Operations System (EMBOS) will provide a comprehensive health tool solution to 10 CFR 851 for Y-12 and can be leveraged to the Nuclear Weapon Complex (NWC); all site in the NWC must meet the requirements of 10 CFR 851 which states that all medical records must be electronically available by 2015. There is also potential to leverage EMBOS to the private4 sector. EMBOS is being developed and deployed in phases. When fully deployed the EMBOS will be a state-of-the-art web-enabled integrated electronic solution providing a complete electronic medical record (EMR). EMBOS has been deployed and provides a dynamic electronic medical history and surveillance program (e.g., Asbestos, Hearing Conservation, and Respirator Wearer) questionnaire. Table 1 below lists EMBOS capabilities and data to be tracked. Data to be tracked: Patient Demographics ¬Ė Current/Historical; Physical Examination Data; Employee Medical Health History; Medical Surveillance Programs; Patient and Provider Schedules; Medical Qualification/Certifications; Laboratory Data; Standardized Abnormal Lab Notifications; Prescription Medication Tracking and Dispensing; Allergies

  16. Electronic Medical Business Operations System

    Energy Science and Technology Software Center (OSTI)

    2012-04-16

    Electronic Management of medical records has taken a back seat both in private industry and in the government. Record volumes continue to rise every day and management of these paper records is inefficient and very expensive. In 2005, the White House announced support for the development of electronic medical records across the federal government. In 2006, the DOE issued 10 CFR 851 requiring all medical records be electronically available by 2015. The Y-12 National Securitymore¬†¬Ľ Complex is currently investing funds to develop a comprehensive EMR to incorporate the requirements of an occupational health facility which are common across the Nuclear Weapons Complex (NWC). Scheduling, workflow, and data capture from medical surveillance, certification, and qualification examinations are core pieces of the system. The Electronic Medical Business Operations System (EMBOS) will provide a comprehensive health tool solution to 10 CFR 851 for Y-12 and can be leveraged to the Nuclear Weapon Complex (NWC); all site in the NWC must meet the requirements of 10 CFR 851 which states that all medical records must be electronically available by 2015. There is also potential to leverage EMBOS to the private4 sector. EMBOS is being developed and deployed in phases. When fully deployed the EMBOS will be a state-of-the-art web-enabled integrated electronic solution providing a complete electronic medical record (EMR). EMBOS has been deployed and provides a dynamic electronic medical history and surveillance program (e.g., Asbestos, Hearing Conservation, and Respirator Wearer) questionnaire. Table 1 below lists EMBOS capabilities and data to be tracked. Data to be tracked: Patient Demographics ¬Ė Current/Historical; Physical Examination Data; Employee Medical Health History; Medical Surveillance Programs; Patient and Provider Schedules; Medical Qualification/Certifications; Laboratory Data; Standardized Abnormal Lab Notifications; Prescription Medication Tracking and Dispensing

  17. Civilian Radioactive Waste Management System Requirements Document

    SciTech Connect (OSTI)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  18. Washington DC Reliability Requirements and the Need to Operate Mirant's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) | Department of Energy Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Pursuant to

  19. Operational Experience with the CEBAF Control System

    SciTech Connect (OSTI)

    K. White; D. Kehne

    1995-10-01

    This paper describes our operational experience with the CEBAF control system. CEBAF is operated using a variety of software packages and custom applications. In the spirit of collaboration and software sharing, the current system utilizes code developed at four major laboratories as well as commercial packages and custom applications. The basis of the CEBAF control system is EPICS (Experimental Physics and Industrial Control System), originally developed at LANL and ANL. The CEBAF accelerator is operated primarily using the common EPICS tools such as the archiver, alarm handler and display manager. In order to supplement the features of EPICS, custom applications have been developed and incorporated into the control system using C, C++, and TCL. Additionally, the CEBAF helium plant is controlled using the CEBAF TACL system which requires communications between the two control systems. CATER, a problem tracking program developed at SLAC, has also been integrated into the operational software. Current plans call for the integration of an on-line logbook developed at APS and the internal development of a down-time logger program. We discuss how these various tools and applications are used operationally, the advantages and disadvantages of the systems and the challenges related to integrating this diverse array of software.

  20. Johnson Noise Thermometry System Requirements

    SciTech Connect (OSTI)

    Britton Jr, Charles L; Roberts, Michael; Ezell, N Dianne Bull; Qualls, A L; Holcomb, David Eugene

    2013-01-01

    This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

  1. Power Systems Operations and Controls | Grid Modernization |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bulk system operations Distributed system controls and optimization Advanced distribution management systems Microgrid controls and resiliency controls Home energy management ...

  2. Gas characterization system operation, maintenance, and calibration plan

    SciTech Connect (OSTI)

    Tate, D.D.

    1996-03-04

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations.

  3. Operational Safety Requirements and Operating Specification Documentation compliance instrumentation matrices: 200 East Area Tank Farms

    SciTech Connect (OSTI)

    Story, D.R.

    1995-03-01

    This document contains information about matrices complied of instrumentation used to comply with the existing Operational Safety Requirements from Safety Analysis Reports and Operating, Specification Documentation requirements for 200 East Area Tank Farms. These matrices contain the primary instrumentation needed to comply with each OSR and/or OSD requirement as well as any backup instrumentation that may be used should the primary device be out of service. The referenced matrices are provided as attachments to this document.

  4. Advances in coiled-tubing operating systems

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II

    1997-06-01

    The expansion of coiled tubing (CT) applications into spooled flowlines, spooled completions, and CT drilling continues to grow at an accelerated rate. For many users within the oil and gas industry, the CT industry appears to be poised on the threshold of the next logical step in its evolution, the creation of a fully integrated operating system. However, for CT to evolve into such an operating system, the associated services must be robust and sufficiently reliable to support the needs of exploration, development drilling, completion, production management, and wellbore-retirement operations both technically and economically. The most critical hurdle to overcome in creating a CT-based operating system is a fundamental understanding of the operating scope and physical limitations of CT technology. The complete list of mechanisms required to advance CT into an operating system is large and complex. However, a few key issues (such as formal education, training, standardization, and increased levels of experience) can accelerate the transition. These factors are discussed.

  5. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  6. Civilian Radioactive Waste Management System Requirements Document...

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level ...

  7. Operations other than war: Requirements for analysis tools research report

    SciTech Connect (OSTI)

    Hartley, D.S. III

    1996-12-01

    This report documents the research effort to determine the requirements for new or improved analysis tools to support decisions at the strategic and operational levels for military Operations Other than War (OOTW). The work was performed for the Commander in Chief, U.S. Pacific Command (USCINCPAC). The data collection was based on workshops attended by experts in OOTWs: analysis personnel from each of the Combatant Commands, the Services, the Office of the Secretary of Defense (OSD), the Joint Staff, and other knowledgeable personnel. Further data were gathered from other workshops and conferences and from the literature. The results of this research begin with the creation of a taxonomy of OOTWs: categories of operations, attributes of operations, and tasks requiring analytical support. The tasks are connected to the Joint Staff`s Universal Joint Task List (UJTL). Historical OOTWs are analyzed to produce frequency distributions by category and responsible CINC. The analysis products are synthesized into a list of requirements for analytical tools and definitions of the requirements. The report concludes with a timeline or roadmap for satisfying the requirements.

  8. Requirements definition for Hanford Access Control System

    SciTech Connect (OSTI)

    Curry, R.H.; Anema, R.J.; Byers, W.R.; Champion, R.E.; Forsberg, J.I.; Fritz, R.L.; Glasscock, J.A.; Keck, R.D.; McRae, L.P.; Morales, T.P.; Sams, M.A.; Schwartz, M.J.; Vickery, E.A.

    1990-03-01

    This document defines the philosophy for access control strategy at the Department of Energy (DOE) Hanford Site. It describes the required elements necessary for effective access control system applications. The document specifies performance requirements for various levels and types of access control equipment. It also discusses methods for measuring the performance of access control equipment and processes. Selected guidance related to testing and maintenance of various levels and types of access control equipment also is included. This document addresses an essential element of the overall security program at Hanford. It supports the DOE philosophy for security programs as defined in the DOE Orders. As stated in DOE Order 5632.1A (Protection Program Operations), ``physical protection of security interests encompasses three major activities: physical security systems, protective forces, and system performance tests.``

  9. Early Warning Expert System for Equipment Operability Surveillance

    Energy Science and Technology Software Center (OSTI)

    1996-12-18

    EWES is an Al-based expert system for signal validation and sensor operability surveillance in industrial applications that require high-reliability, high-sensitivity annunciation of degraded sensors, discrepant signals, or the onset or incipience of system disturbances.

  10. Supplemental design requirements document solid waste operations complex

    SciTech Connect (OSTI)

    Ocampo, V.P.; Boothe, G.F.; Broz, D.R.; Eaton, H.E.; Greager, T.M.; Huckfeldt, R.A.; Kooiker, S.L.; Lamberd, D.L.; Lang, L.L.; Myers, J.B.

    1994-11-01

    This document provides additional and supplemental information to the WHC-SD-W112-FDC-001, WHC-SD-W113-FDC-001, and WHC-SD-W100-FDC-001. It provides additional requirements for the design and summarizes Westinghouse Hanford Company key design guidance and establishes the technical baseline agreements to be used for definitive design common to the Solid Waste Operations Complex (SWOC) Facilities (Project W-112, Project W-113, and WRAP 2A).

  11. A Computuerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

    2013-08-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based

  12. A Computuerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

    2013-11-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based

  13. Integrating Solar PV in Utility System Operations

    SciTech Connect (OSTI)

    Mills, A.; Botterud, A.; Wu, J.; Zhou, Z.; Hodge, B-M.; Heany, M.

    2013-10-31

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with ‚Äúrealistic‚ÄĚ PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with ‚Äúwell behaved‚ÄĚ PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved

  14. Electric System Intra-hour Operation Simulator

    Energy Science and Technology Software Center (OSTI)

    2014-03-07

    ESIOS is a software program developed at Pacific Northwest National Laboratory (PNNL) that performs intra-hour dispatch and automatic generation control (AGC) simulations for electric power system frequency regulation and load/variable generation following. The program dispatches generation resources at minute interval to meet control performance requirements, while incorporating stochastic models of forecast errors and variability with generation, load, interchange and market behaviors. The simulator also contains an operator model that mimics manual actions to adjust resourcemore¬†¬Ľ dispatch and maintain system reserves. Besides simulating generation fleet intra-hour dispatch, ESIOS can also be used as a test platform for the design and verification of energy storage, demand response, and other technologies helping to accommodate variable generation.¬ę¬†less

  15. Electrochemical cell operation and system

    DOE Patents [OSTI]

    Maru, Hansraj C.

    1980-03-11

    Thermal control in fuel cell operation is affected through sensible heat of process gas by providing common input manifolding of the cell gas flow passage in communication with the cell electrolyte and an additional gas flow passage which is isolated from the cell electrolyte and in thermal communication with a heat-generating surface of the cell. Flow level in the cell gas flow passage is selected based on desired output electrical energy and flow level in the additional gas flow passage is selected in accordance with desired cell operating temperature.

  16. Minimum 186 Basin levels required for operation of ECS and CWS pumps

    SciTech Connect (OSTI)

    Reeves, K.K.; Barbour, K.L.

    1992-10-01

    Operation of K Reactor with a cooling tower requires that 186 Basin loss of inventory transients be considered during Design Basis Accident analyses requiring ECS injection, such as the LOCA and LOPA. Since the cooling tower systems are not considered safety systems, credit is not taken for their continued operation during a LOPA or LOCA even though they would likely continue to operate as designed. Without the continued circulation of cooling water to the 186 Basin by the cooling tower pumps, the 186 Basin will lose inventory until additional make-up can be obtained from the river water supply system. Increasing the make-up to the 186 Basin from the river water system may require the opening of manually operated valves, the starting of additional river water pumps, and adjustments of the flow to L Area. In the time required for these actions a loss of basin inventory could occur. The ECS and CWS pumps are supplied by the 186 Basin. A reduction in the basin level will result in decreased pump suction head. This reduction in suction head will result in decreased output from the pumps and, if severe enough, could lead to pump cavitation for some configurations. The subject of this report is the minimum 186 Basin level required to prevent ECS and CWS pump cavitation. The reduction in ECS flow due to a reduced 186 Basin level without cavitation is part of a separate study.

  17. Monitored Geologic Repository Operations Monitoring and Control System Description Document

    SciTech Connect (OSTI)

    E.F. Loros

    2000-06-29

    consists of instrument and control equipment and components necessary to provide human operators with sufficient information to monitor and control the operation of the repository in an efficient and safe manner. The system consists of operator consoles and workstations, multiple video display terminals, communications and interfacing equipment, and instrument and control software with customized configuration to meet the needs of the Monitored Geologic Repository (MGR). Process and logic controllers and the associated input/output units of each system interfaced with this system will be configured into Remote Terminal Units (RTU) and located close to the systems to be monitored and controlled. The RTUs are configured to remain operational should communication with CCC operations be lost. The system provides closed circuit television to selectively view systems, operations, and equipment areas and to aid in the operation of mechanical systems. Control and monitoring of site utility systems will be located in the CCC. Site utilities include heating, ventilation, and air conditioning equipment; plant compressed air; plant water; firewater; electrical systems; and inert gases, such as nitrogen, if required. This system interfaces with surface and subsurface systems that either generate output data or require remote control input. The system interfaces with the Site Communications System for bulk storage of operational data, on-site and off-site communication, and a plant-wide public announcement system. The system interfaces with the Safeguards and Security System to provide operational status and emergency alarm indications. The system interfaces with the Site Operation System to provide site wide acquisition of data for analysis and reports, historical information for trends, utility information for plant operation, and to receive operating plans and procedures.

  18. California Independent System Operator | Open Energy Information

    Open Energy Info (EERE)

    search 200px Name: California Independent System Operator Address: California ISO P.O. Box 639014 Place: Folsom, California Zip: 95763-9014 Sector: Services Phone Number:...

  19. Chapter 42.101: Audit Requirements for Non-Management and Operating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracts | Department of Energy 2.101: Audit Requirements for Non-Management and Operating Contracts Chapter 42.101: Audit Requirements for Non-Management and Operating Contracts Acquisition Guide Chapter 42.101: Audit Requirements for Non-Management and Operating Contracts Chapter 42.101: Audit Requirements for Non-Management and Operating Contracts (92.78 KB) More Documents & Publications ACQUISITION GUIDE CHAPTER 42.101: AUDIT REQUIREMENTS FOR NON-MANAGEMENT AND OPERATING CONTRACTS

  20. Westinghouse VANTAGE+ fuel assembly to meet future PWR operating requirements

    SciTech Connect (OSTI)

    Doshi, P.K.; Chapin, D.L.; Scherpereel, L.R.

    1988-01-01

    Many utilities operating pressurized water reactors (PWRs) are implementing longer reload cycles. Westinghouse is addressing this trend with fuel products that increase fuel utilization through higher discharge burnups. Higher burnup helps to offset added enriched uranium costs necessary to enable the higher energy output of longer cycles. Current fuel products have burnup capabilities in the area of 40,000 MWd/tonne U or more. There are three main phenomena that must be addressed to achieve even higher burnup levels: accelerated cladding, waterside corrosion, and hydriding; increased fission gas production; and fuel rod growth. Long cycle lengths also require efficient burnable absorbers to control the excess reactivity associated with increased fuel enrichment while maintaining a low residual absorber penalty at the end of cycle. Westinghouse VANTAGE + PWR fuel incorporates features intended to enhance fuel performance at very high burnups, including advances in the three basic elements of the fuel assembly: fuel cladding, fuel rod, and fuel assembly skeleton. ZIRLO {sup TM} cladding, an advanced Zircaloy cladding that contains niobium, offers a significant improvement in corrosion resistance relative to Zircaloy-4. Another important Westinghouse PWR fuel feature that facilitates long cycles is the zirconium diboride integral fuel burnable absorber (ZrB{sub 2}IFBA).

  1. Balance-of-System Equipment Required for Renewable Energy Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Balance-of-System Equipment Required for Renewable Energy Systems Balance-of-System Equipment Required for Renewable Energy Systems Both grid-connected and off-grid home renewable energy systems require additional √ʬĬúbalance-of-system√Ę¬Ä¬Ě equipment. Both grid-connected and off-grid home renewable energy systems require additional "balance-of-system" equipment. Whether you decide to connect your home renewable energy system to the electric grid or not, you

  2. A rod pumping system for California lift requirements

    SciTech Connect (OSTI)

    Tait, H.C.

    1983-03-01

    Artificial lift requirements in California oil fields cover a full range of demanding operating and environmental conditions. These extend from typical demands of lifting depth and volume, to atypical requirements of heavy crude, thermal enhancement and the unique environmental restrictions of our urban sites and offshore fields. A new rod pumping system has been developed which deals with these requirements. Performance results to date confirm reduced power consumption and improved pumping performance. Combined with the compact equipment size, these characteristics appear to offer benefits to California operators.

  3. Simulating the Dynamic Coupling of Market and Physical System Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Roop, Joseph M.; Guttromson, Ross T.; Huang, Zhenyu

    2004-06-01

    Abstract-As energy trading products cover shorter time periods and demand response programs move toward real-time pricing, financial market-based activity impacts ever more directly the physical operation of the system. To begin to understand the complex interactions between the market-driven operation signals, the engineered controlled schemes, and the laws of physics, new system modeling and simulation techniques must be explored. This discussion describes requirements for new simulation tools to address such market transaction control interactions and an approach to capture the dynamic coupling between energy markets and the physical operation of the power system appropriate for dispatcher reaction time frames.

  4. Concept of Operations for Real-time Airborne Management System

    SciTech Connect (OSTI)

    Barr, Jonathan L.; Taira, Randal Y.; Orr, Heather M.

    2013-03-04

    The purpose of this document is to describe the operating concepts, capabilities, and benefits of RAMS including descriptions of how the system implementations can improve emergency response, damage assessment, task prioritization, and situation awareness. This CONOPS provides general information on operational processes and procedures required to utilize RAMS, and expected performance benefits of the system. The primary audiences for this document are the end users of RAMS (including flight operators and incident commanders) and the RAMS management team. Other audiences include interested offices within the Department of Homeland Security (DHS), and officials from other state and local jurisdictions who want to implement similar systems.

  5. Operation of staged membrane oxidation reactor systems

    SciTech Connect (OSTI)

    Repasky, John Michael

    2012-10-16

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  6. Nuclear Materials Identification System Operational Manual

    SciTech Connect (OSTI)

    Chiang, L.G.

    2001-04-10

    This report describes the operation and setup of the Nuclear Materials Identification System (NMIS) with a {sup 252}Cf neutron source at the Oak Ridge Y-12 Plant. The components of the system are described with a description of the setup of the system along with an overview of the NMIS measurements for scanning, calibration, and confirmation of inventory items.

  7. Smart Grid - Transforming Power System Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Kirkham, Harold

    2010-04-28

    AbstractóElectric power systems are entering a new realm of operations. Large amounts of variable generation tax our ability to reliably operate the system. Couple this with a greater reliance on the electricity network to serve consumer demand that is likely to rise significantly even as we drive for greater efficiency. Trade-offs between energy and environmental needs will be constantly negotiated, while a reliable supply of electricity needs even greater assurance in a world where threats of disruption have risen. Smart grid capabilities are being proposed to help address the challenges confronting system operations. This paper reviews the impact of smart grid functionality on transforming power system operations. It explores models for distributed energy resources (DER Ė generation, storage, and load) that are appearing on the system. It reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be addressed as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  8. Deficiency tracking system, conceptual business process requirements

    SciTech Connect (OSTI)

    Hermanson, M.L.

    1997-04-18

    The purpose of this document is to describe the conceptual business process requirements of a single, site-wide, consolidated, automated, deficiency management tracking, trending, and reporting system. This description will be used as the basis for the determination of the automated system acquisition strategy including the further definition of specific requirements, a ''make or buy'' determination and the development of specific software design details.

  9. Requirements for CEC POP machine protection system

    SciTech Connect (OSTI)

    Pinayev, I.

    2015-02-18

    The requirements of CEC POP machine protection system are meant to prevent damage to a vacuum chamber by a missteered electron beam. In this example, beam energy = 22 MeV, Maximal bunch charge = 5 nC, Maximal repetition rate = 78 kHz, Normalized emittance = 5 mm mrad, Minimal ő≤-function = 1 m. From this information the requirements of the protection system can be calculated by factoring the information into equations to find beam densities and temperature excursions.

  10. A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

    SciTech Connect (OSTI)

    Thomas A. Ulrich; Roger Lew; Ronald L. Boring; Ken Thomas

    2015-03-01

    A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

  11. Evaluating operating system vulnerability to memory errors.

    SciTech Connect (OSTI)

    Ferreira, Kurt Brian; Bridges, Patrick G.; Pedretti, Kevin Thomas Tauke; Mueller, Frank; Fiala, David; Brightwell, Ronald Brian

    2012-05-01

    Reliability is of great concern to the scalability of extreme-scale systems. Of particular concern are soft errors in main memory, which are a leading cause of failures on current systems and are predicted to be the leading cause on future systems. While great effort has gone into designing algorithms and applications that can continue to make progress in the presence of these errors without restarting, the most critical software running on a node, the operating system (OS), is currently left relatively unprotected. OS resiliency is of particular importance because, though this software typically represents a small footprint of a compute node's physical memory, recent studies show more memory errors in this region of memory than the remainder of the system. In this paper, we investigate the soft error vulnerability of two operating systems used in current and future high-performance computing systems: Kitten, the lightweight kernel developed at Sandia National Laboratories, and CLE, a high-performance Linux-based operating system developed by Cray. For each of these platforms, we outline major structures and subsystems that are vulnerable to soft errors and describe methods that could be used to reconstruct damaged state. Our results show the Kitten lightweight operating system may be an easier target to harden against memory errors due to its smaller memory footprint, largely deterministic state, and simpler system structure.

  12. A Framework for Adaptable Operating and Runtime Systems

    SciTech Connect (OSTI)

    Sterling, Thomas

    2014-03-04

    The emergence of new classes of HPC systems where performance improvement is enabled by Moore‚Äôs Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain through technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (‚ÄúOS noise‚ÄĚ) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.

  13. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    DOE Patents [OSTI]

    Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu

    2008-10-14

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  14. Naturalistic Decision Making For Power System Operators

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2009-06-23

    Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

  15. PIA - WEB Unclassified Business Operations General Support System...

    Energy Savers [EERE]

    WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General...

  16. PIA - WEB Unclassified Business Operations General Support System...

    Office of Environmental Management (EM)

    Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support ...

  17. Balance-of-System Equipment Required for Renewable Energy Systems...

    Broader source: Energy.gov (indexed) [DOE]

    Both grid-connected and off-grid home renewable energy systems require additional balance-of-system equipment. Both grid-connected and off-grid home renewable energy...

  18. Interagency mechanical operations group numerical systems group

    SciTech Connect (OSTI)

    1997-09-01

    This report consists of the minutes of the May 20-21, 1971 meeting of the Interagency Mechanical Operations Group (IMOG) Numerical Systems Group. This group looks at issues related to numerical control in the machining industry. Items discussed related to the use of CAD and CAM, EIA standards, data links, and numerical control.

  19. Control System Design Philosophy for Effective Operations and Maintenance

    SciTech Connect (OSTI)

    Karen S. White; Matthew Bickley

    2001-11-01

    A well-designed control system facilitates the functions of machine operation, maintenance and development. In addition, the overall effectiveness of the control system can be greatly enhanced by providing reliable mechanisms for coordination and communication, ensuring that these functions work in concert. For good operability, the information presented to operators should be consistent and easy to understand. The user interfaces should be simple to customize. A maintainable system allows a broken element to be quickly identified and repaired while leaving the balance of the system available. In a research and development environment, the control system must meet the frequently changing requirements of a variety of customers. This means the system must be flexible enough to allow for ongoing modifications with minimal disruptions to operations. Beyond the hardware and software elements of the control system, appropriate processes must be in place to maximize system uptime and allow people to work efficiently. Processes that provide automatic electronic communication ensure that information is not lost and reaches its destination in a timely fashion. This paper discusses how these control system design and quality issues have been applied at the Thomas Jefferson National Accelerator Facility. *This work was supported by the U.S. DOE contract No. DE-AC05-84ER40150.

  20. Operation and maintenance manual for the LDUA operations control trailer (LDUA System 4100)

    SciTech Connect (OSTI)

    Clark, D.A.

    1996-09-10

    The Light Duty Utility Arm (LDUA) Operations Control Trailer(OCT) has completed testing and is ready for operation. This document defines the requirements applicable to the operation and maintenance of the OCT.

  1. From US NAVY Mate to Division Leader for Operations - Requirements, Development and Career Paths of LANL/LANSCE Accelerator Operators

    SciTech Connect (OSTI)

    Spickermann, Thomas

    2012-07-26

    There are opportunities for advancement within the team. Operators advance by: (1) Becoming fully qualified - following the LANSCE Accelerator Operator Training Manual, Operator trainees go through 5 levels of qualification, from Radiation Security System to Experimental Area Operator. Must obtain Knowledge and Performance checkouts by an OSS or AOSS, and an End-of-Card checkout by the team leader or RSS engineer (level I). Program was inspired by US NAVY qualification program for nuclear reactor operators. Time to complete: 2-2.5 years. (2) Fully qualified operators are eligible to apply for vacant (OSS)/AOSS positions; and (3) Alternatively, experienced operators can sign up for the voluntary Senior Operator Qualification Program. They must demonstrate in-depth knowledge of all areas of the accelerator complex. Time to complete is 2-3 years (Minimum 4 years from fully qualified). Eligible for promotion to level between qualified operator and AOSS.

  2. Tank waste remediation system operational scenario

    SciTech Connect (OSTI)

    Johnson, M.E.

    1995-05-01

    The Tank Waste Remediation System (TWRS) mission is to store, treat, and immobilize highly radioactive Hanford waste (current and future tank waste and the strontium and cesium capsules) in an environmentally sound, safe, and cost-effective manner (DOE 1993). This operational scenario is a description of the facilities that are necessary to remediate the Hanford Site tank wastes. The TWRS Program is developing technologies, conducting engineering analyses, and preparing for design and construction of facilities necessary to remediate the Hanford Site tank wastes. An Environmental Impact Statement (EIS) is being prepared to evaluate proposed actions of the TWRS. This operational scenario is only one of many plausible scenarios that would result from the completion of TWRS technology development, engineering analyses, design and construction activities and the TWRS EIS. This operational scenario will be updated as the development of the TWRS proceeds and will be used as a benchmark by which to evaluate alternative scenarios.

  3. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    SciTech Connect (OSTI)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements.

  4. Training on PV Systems: Design, Construction, Operation and Maintenanc...

    Open Energy Info (EERE)

    on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation...

  5. PIA - Savannah River Operations Office Lotus Domino/Notes System...

    Broader source: Energy.gov (indexed) [DOE]

    Lotus DominoNotes System PDF icon PIA - Savannah River Operations Office Lotus DominoNotes System More Documents & Publications PIA - DOE Savannah River Operations Office PRISM ...

  6. Assessment of Offshore Wind System Design, Safety, and Operation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of Offshore Wind System Design, Safety, and Operation Standards Assessment of Offshore Wind System Design, Safety, and Operation Standards The U.S. Department of ...

  7. New York Independent System Operator, Smart Grid RFI: Addressing...

    Office of Environmental Management (EM)

    New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical ... September 17, 2010 Federal Register, the New York Independent System Operator, Inc. ...

  8. The case for extensible operating systems for exascale. (Conference...

    Office of Scientific and Technical Information (OSTI)

    The case for extensible operating systems for exascale. Citation Details In-Document Search Title: The case for extensible operating systems for exascale. Authors: Ferreira, Kurt ...

  9. Dynamic Object Oriented Requirements System (DOORS) System Test Plan

    SciTech Connect (OSTI)

    JOHNSON, A.L.

    2000-04-01

    The U. S. Department of Energy, Office of River Protection (ORP) will use the Dynamic Object Oriented Requirements System (DOORS) as a tool to assist in identifying, capturing, and maintaining the necessary and sufficient set of requirements for accomplishing the ORP mission. By managing requirements as one integrated set, the ORP will be able to carry out its mission more efficiently and effectively. DOORS is a Commercial-Off-The-Shelf (COTS) requirements management tool. The tool has not been customized for the use of the PIO, at this time.

  10. Modeling Power System Operation with Intermittent Resources

    SciTech Connect (OSTI)

    Marinovici, Maria C.; Kirkham, Harold; Glass, Kevin A.; Carlsen, Leif C.

    2013-02-27

    Electricity generating companies and power system operators face the need to minimize total fuel cost or maximize total profit over a given time period. These issues become optimization problems subject to a large number of constraints that must be satisfied simultaneously. The grid updates due to smart-grid technologies plus the penetration of intermittent re- sources in electrical grid introduce additional complexity to the optimization problem. The Renewable Integration Model (RIM) is a computer model of interconnected power system. It is intended to provide insight and advice on complex power systems management, as well as answers to integration of renewable energy questions. This paper describes RIM basic design concept, solution method, and the initial suite of modules that it supports.

  11. OPERATING THE WAND AND HERCULES PROTOTYPE SYSTEMS

    SciTech Connect (OSTI)

    K. GRUETZMACHER; ET AL

    2001-01-01

    Two prototype systems for low-density Green is Clean (GIC) waste at Los Alamos National Laboratory (LANL) have been in operation for three years at the Solid Waste Operation's (SWOs) non-destructive assay (NDA) building. The Waste Assay for Nonradioactive Disposal (WAND) and the High Efficiency Radiation Counters for Ultimate Low Emission Sensitivity (HERCULES) are used to verify the waste generator's acceptable knowledge (AK) that low-density waste is nonradioactive. GIC waste includes all non-regulated waste generated in radiological controlled areas (RCAs) that has been actively segregated as ''clean'' (i.e., nonradioactive) through the use of waste generator AK. GIC waste that is verified clean can be disposed of at the Los Alamos County Landfill. It is estimated that 50-90% of the low-density room trash from RCAs at LANL might be free of contamination. To date, with pilot programs at five facilities at LANL, 3000 cubic feet of GIC waste has been verified clean by these two prototype systems. Both the WAND and HERCULES systems are highly sensitive measurement systems optimized to detect very small quantities of common LANL radionuclides. Both of the systems use a set of phoswich scintillation detectors in close proximity to the waste, which have the capability of detecting plutonium-239 concentrations below 3 pCi per gram of low density waste. Both systems detect low-energy x-rays and a broad range of gamma rays (10-2000 keV), while the WAND system also detects high energy beta particles (>100 keV). The WAND system consists of a bank of six shielded detectors which screen low density shredded waste or stacked sheets of paper moving under the detectors in a twelve inch swath on a conveyor belt. The WAND system was developed and tested at the Los Alamos Plutonium Facility in conjunction with instrument system designers from the Los Alamos Safeguards Science and Technology group. The HERCULES system consists of a bank of three shielded detectors which screen low

  12. Reliability and availability requirements analysis for DEMO: fuel cycle system

    SciTech Connect (OSTI)

    Pinna, T.; Borgognoni, F.

    2015-03-15

    The Demonstration Power Plant (DEMO) will be a fusion reactor prototype designed to demonstrate the capability to produce electrical power in a commercially acceptable way. Two of the key elements of the engineering development of the DEMO reactor are the definitions of reliability and availability requirements (or targets). The availability target for a hypothesized Fuel Cycle has been analysed as a test case. The analysis has been done on the basis of the experience gained in operating existing tokamak fusion reactors and developing the ITER design. Plant Breakdown Structure (PBS) and Functional Breakdown Structure (FBS) related to the DEMO Fuel Cycle and correlations between PBS and FBS have been identified. At first, a set of availability targets has been allocated to the various systems on the basis of their operating, protection and safety functions. 75% and 85% of availability has been allocated to the operating functions of fuelling system and tritium plant respectively. 99% of availability has been allocated to the overall systems in executing their safety functions. The chances of the systems to achieve the allocated targets have then been investigated through a Failure Mode and Effect Analysis and Reliability Block Diagram analysis. The following results have been obtained: 1) the target of 75% for the operations of the fuelling system looks reasonable, while the target of 85% for the operations of the whole tritium plant should be reduced to 80%, even though all the tritium plant systems can individually reach quite high availability targets, over 90% - 95%; 2) all the DEMO Fuel Cycle systems can reach the target of 99% in accomplishing their safety functions. (authors)

  13. Match Pumps to System Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Match Pumps to System Requirements This tip sheet describes how to correct imbalanced pumping systems and improve system efficiency. PUMPING SYSTEMS TIP SHEET 6 PDF icon Match ...

  14. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  15. Badge Request System PIA, Richland Operations Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office Badge Request System PIA, Richland Operations Office (67.95 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National Laboratory

  16. Distribution of Wind Power Forecasting Errors from Operational Systems (Presentation)

    SciTech Connect (OSTI)

    Hodge, B. M.; Ela, E.; Milligan, M.

    2011-10-01

    This presentation offers new data and statistical analysis of wind power forecasting errors in operational systems.

  17. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  18. REAL TIME SYSTEM OPERATIONS 2006-2007

    SciTech Connect (OSTI)

    Eto, Joseph H.; Parashar, Manu; Lewis, Nancy Jo

    2008-08-15

    The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

  19. SES Performance Management System Policy and Operating Procedures

    Broader source: Energy.gov [DOE]

    The SES Performance Management System Policy and Operating Procedures are designed to provide the framework for DOE’s performance management system. This performance management system applies to...

  20. System requirements specification for waste information and control system

    SciTech Connect (OSTI)

    Harris, R.R.

    1994-09-01

    This document defines the requirements for the Waste Information and Control System (WICS). The document defines the functions, constraints, and objectives that pertain to WICS. This shall serve as the baseline document to ensure the needs of the Hazardous Material Control group (HMC) at 222-S Laboratory are met with regard to assurance of accuracy and quality of data taken with WICS.

  1. PIA - WEB Unclassified Business Operations General Support System |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System (355.91 KB) More Documents & Publications PIA - WEB Physical Security Major Application PIA - INL PeopleSoft - Human Resource System PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE

  2. High-Level Functional and Operational Requirements for the Advanced Fuel Cycle Facilty

    SciTech Connect (OSTI)

    Charles Park

    2006-12-01

    High-Level Functional & Operational Requirements for the AFCF -This document describes the principal functional and operational requirements for the proposed Advanced Fuel Cycle Facility (AFCF). The AFCF is intended to be the world's foremost facility for nuclear fuel cycle research, technology development, and demonstration. The facility will also support the near-term mission to develop and demonstrate technology in support of fuel cycle needs identified by industry, and the long-term mission to retain and retain U.S. leadership in fuel cycle operations. The AFCF is essential to demonstrate a more proliferation-resistant fuel cycle and make long-term improvements in fuel cycle effectiveness, performance and economy.

  3. Pantex_Operational_Health_System-_PIA.pdf

    Energy Savers [EERE]

    of Energy and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth Sites Advance Operations at DUF6 Plants November 1, 2011 - 12:00pm Addthis First cylinder enters plant. First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth - Babcock & Wilcox Conversion Services (BWCS) began work at the Paducah and Portsmouth sites

  4. Commissioning and operation of the CEBAF end station refrigeration system

    SciTech Connect (OSTI)

    Arenius, D.; Bevins, B.; Chronis, W.C.; Ganni, V.; Kashy, D.; Keesee, M.; Wilson, J. Jr.

    1996-08-01

    The CEBAF End Station Helium Refrigerator (ESR) System provides refrigeration at 80 K, 20 K and 4.5 K to three End Station experimental halls. The facility consists of a two stage helium screw compressor system, 4.5 K refrigerator, cryogen distribution valve box, and transfer lines to the individual experimental halls. The 4.5 K cold box and compressors were originally part of the ESCAR 1,500 W, 4 K refrigeration system at Lawrence Berkeley Laboratory which was first commissioned fin 1977. The compressors, 4.5 K cold box, and control system design were modified to adapt the plant for the requirements of the CEBAF experimental halls. Additional subsystems of cryogen distribution, transfer lines, warm gas management, and computer control interface were added. This paper describes the major plant subsystems, modifications, operational experiences and performance.

  5. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

  6. V-174: RSA Authentication Manager Writes Operating System, SNMP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: RSA Authentication Manager Writes Operating System, SNMP, and HTTP Plug-in Proxy Passwords in Clear Text to Log Files V-174: RSA Authentication Manager Writes Operating System,...

  7. Water Outlet Control Mechanism for Fuel Cell System Operation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Find More Like This Return to Search Water Outlet Control Mechanism for Fuel Cell System Operation in Variable Gravity Environments Self-Regulating Water Separation System for Fuel ...

  8. Surveillance Analysis Computer System (SACS) software requirements specification (SRS)

    SciTech Connect (OSTI)

    Glasscock, J.A.; Flanagan, M.J.

    1995-09-01

    This document is the primary document establishing requirements for the Surveillance Analysis Computer System (SACS) Database, an Impact Level 3Q system. The purpose is to provide the customer and the performing organization with the requirements for the SACS Project.

  9. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  10. Optimal operational planning of cogeneration systems with thermal storage by the decomposition method

    SciTech Connect (OSTI)

    Yokoyama, R.; Ito, K.

    1995-12-01

    An optimal operational planning method is proposed for cogeneration systems with thermal storage. The daily operational strategy of constituent equipment is determined so as to minimize the daily operational cost subject to the energy demand requirement. This optimization problem is formulated as a large-scale mixed-integer linear programming one, and it is solved by means of the decomposition method. Effects of thermal storage on the operation of cogeneration systems are examined through a numerical study on a gas engine-driven cogeneration system installed in a hotel. This method is a useful tool for evaluating the economic and energy-saving properties of cogeneration systems with thermal storage.

  11. Test report - caustic addition system operability test procedure

    SciTech Connect (OSTI)

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  12. System Design Description and Requirements for Modeling the Off-Gas Systems for Fuel Recycling Facilities

    SciTech Connect (OSTI)

    Daryl R. Haefner; Jack D. Law; Troy J. Tranter

    2010-08-01

    This document provides descriptions of the off-gases evolved during spent nuclear fuel processing and the systems used to capture the gases of concern. Two reprocessing techniques are discussed, namely aqueous separations and electrochemical (pyrochemical) processing. The unit operations associated with each process are described in enough detail so that computer models to mimic their behavior can be developed. The document also lists the general requirements for the desired computer models.

  13. Overall requirements for an advanced underground coal extraction system

    SciTech Connect (OSTI)

    Goldsmith, M.; Lavin, M.L.

    1980-10-15

    This report presents overall requirements on underground mining systems suitable for coal seams exploitable in the year 2000, with particular relevance to the resources of Central Appalachia. These requirements may be summarized as follows: (1) Production Cost: demonstrate a return on incremental investment of 1.5 to 2.5 times the value required by a low-risk capital project. (2) Miner Safety: achieve at least a 50% reduction in deaths and disabling injuries per million man-hours. (3) Miner Health: meet the intent of all applicable regulations, with particular attention to coal dust, carcinogens, and mutagens; and with continued emphasis on acceptable levels of noise and vibration, lighting, humidity and temperature, and adequate work space. (4) Environmental Impact: maintain the value of mined and adjacent lands at the pre-mining value following reclamation; mitigation of off-site impacts should not cost more than the procedures used in contemporary mining. (5) Coal Conservation: the recovery of coal from the seam being mined should be at least as good as the best available contemporary technology operating in comparable conditions. No significant trade-offs between production cost and other performance indices were found.

  14. Operating Systems Support for Advanced Programming Languages

    SciTech Connect (OSTI)

    Kubiatowicz, John

    2012-10-29

    As machines grow in scale and complexity, techniques to make the most effective use of network, memory, and processor resources will also become increasingly important. Programming models that rely on one-sided communication or global address space support have demonstrated advantages for productivity and performance, but they are most effective when used with proper OS support. We propose to develop OS and runtime support for programming models like UPC, GA, Charm++, and HPCS languages, which rely on one-sided communication. Rather than a full OS model, we envision applications bundled with only the necessary OS functions linked in to the application in user space -- relying on the hypervisor for protaction, resource sharing, and mangagement of Quality of Service guarantees. Our services will include support for remote reads and writes to memory, along with remote active message handlers, which are essential for support of fast noncontiguous memory operations, atomic operations, and event-driven applications.

  15. Water turbine system and method of operation

    DOE Patents [OSTI]

    Costin, Daniel P.

    2010-06-15

    A system for providing electrical power from a current turbine is provided. The system includes a floatation device and a mooring. A water turbine structure is provided having an upper and lower portion wherein the lower portion includes a water fillable chamber. A plurality of cables are used to couple the system where a first cable couples the water turbine to the mooring and a second cable couples the floatation device to the first cable. The system is arranged to allow the turbine structure to be deployed and retrieved for service, repair, maintenance and redeployment.

  16. Water turbine system and method of operation

    DOE Patents [OSTI]

    Costin, Daniel P.

    2009-02-10

    A system for providing electrical power from a current turbine is provided. The system includes a floatation device and a mooring. A water turbine structure is provided having an upper and lower portion wherein the lower portion includes a water fillable chamber. A plurality of cables are used to couple the system where a first cable couples the water turbine to the mooring and a second cable couples the floatation device to the first cable. The system is arranged to allow the turbine structure to be deployed and retrieved for service, repair, maintenance and redeployment.

  17. Water turbine system and method of operation

    DOE Patents [OSTI]

    Costin, Daniel P.

    2011-05-10

    A system for providing electrical power from a current turbine is provided. The system includes a floatation device and a mooring. A water turbine structure is provided having an upper and lower portion wherein the lower portion includes a water fillable chamber. A plurality of cables are used to couple the system where a first cable couples the water turbine to the mooring and a second cable couples the floatation device to the first cable. The system is arranged to allow the turbine structure to be deployed and retrieved for service, repair, maintenance and redeployment.

  18. Midwest Independent Transmission System Operator Smart Grid Project...

    Open Energy Info (EERE)

    to optimize the dispatch and operation of power plants while improving the reliability of the bulk transmission system. This project deploys phasor measurement units...

  19. EA-1982: Parker-Davis Transmission System Routine Operation and...

    Broader source: Energy.gov (indexed) [DOE]

    proposed continuation of operation and maintenance activities and implementation of a ... and at substations and maintenance facilities associated with the transmission system. ...

  20. Testing the design and operations of a new badging system

    SciTech Connect (OSTI)

    Storch, N.

    1997-11-01

    This report contains viewgraphs on testing the design and operation of a security badging system for the Lawrence Livermore National Laboratory.

  1. Posters Toward an Operational Water Vapor Remote Sensing System...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Posters Toward an Operational Water Vapor Remote Sensing System Using the Global ... T. Van Hove and C. Rocken University Navstar Consortium Boulder, Colorado Background Water ...

  2. Green Building Certification Systems Requirement for New Federal Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Major Renovations of Federal Buildings Final Rule | Department of Energy Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings Final Rule Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings Final Rule Document details the Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings' Final Rule for 10 CFR

  3. Energy.gov Content Management System Requirements and Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Energy.gov Content Management System Requirements and Guidance Energy.gov Content Management System Requirements and Guidance The Office of Energy Efficiency and Renewable Energy's (EERE's) websites are hosted in Energy.gov's Drupal content management system (CMS), which is maintained by the U.S. Department of Energy's Public Affairs Office. Learn more about Energy.gov's Drupal CMS requirements and guidance for: Page types Block types Linking File naming conventions Optimizing

  4. Wave Energy Converter System Requirements and Performance Metrics

    Broader source: Energy.gov [DOE]

    The Energy Department and Wave Energy Scotland are holding a joint workshop on wave energy converter (WEC) system requirements and performance metrics on Friday, February 26.

  5. Green Building Certification Systems Requirement for New Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings Final Rule Fossil Fuel-Generated Energy Consumption Reduction ...

  6. Green Building Certification Systems Requirement for New Federal...

    Office of Environmental Management (EM)

    Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings OIRA Comparison Document Fossil Fuel-Generated Energy ...

  7. TECHNICAL BASIS FOR VENTILATION REQUIREMENTS IN TANK FARMS OPERATING SPECIFICATIONS DOCUMENTS

    SciTech Connect (OSTI)

    BERGLIN, E J

    2003-06-23

    This report provides the technical basis for high efficiency particulate air filter (HEPA) for Hanford tank farm ventilation systems (sometimes known as heating, ventilation and air conditioning [HVAC]) to support limits defined in Process Engineering Operating Specification Documents (OSDs). This technical basis included a review of older technical basis and provides clarifications, as necessary, to technical basis limit revisions or justification. This document provides an updated technical basis for tank farm ventilation systems related to Operation Specification Documents (OSDs) for double-shell tanks (DSTs), single-shell tanks (SSTs), double-contained receiver tanks (DCRTs), catch tanks, and various other miscellaneous facilities.

  8. PV Charging System for Remote Area Operations

    SciTech Connect (OSTI)

    Ilsemann, Frederick; Thompson, Roger

    2008-07-31

    The objective of this project is to provide the public with a study of new as well existing technology to recharge batteries used in the field. A new product(s) will also be built based upon the information ascertained. American Electric Vehicles, Inc. (AEV) developed systems and methods suitable for charging state-of-the-art lithium-ion batteries in remote locations under both ideal and cloudy weather conditions. Conceptual designs are described for existing and next generation technology, particularly as regards solar cells, peak power trackers and batteries. Prototype system tests are reported.

  9. Match Pumps to System Requirements: Industrial Technologies Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 * October 2005 Match Pumps to System Requirements An industrial facility can reduce the energy costs associated with its pumping systems, and save both energy and money, in many ...

  10. Energy Efficient Operation of Ammonia Refrigeration Systems

    SciTech Connect (OSTI)

    Mohammed, Abdul Qayyum; Wenning, Thomas J; Sever, Franc; Kissock, Professor Kelly

    2013-01-01

    Ammonia refrigeration systems typically offer many energy efficiency opportunities because of their size and complexity. This paper develops a model for simulating single-stage ammonia refrigeration systems, describes common energy saving opportunities, and uses the model to quantify those opportunities. The simulation model uses data that are typically available during site visits to ammonia refrigeration plants and can be calibrated to actual consumption and performance data if available. Annual electricity consumption for a base-case ammonia refrigeration system is simulated. The model is then used to quantify energy savings for six specific energy efficiency opportunities; reduce refrigeration load, increase suction pressure, employ dual suction, decrease minimum head pressure set-point, increase evaporative condenser capacity, and reclaim heat. Methods and considerations for achieving each saving opportunity are discussed. The model captures synergistic effects that result when more than one component or parameter is changed. This methodology represents an effective method to model and quantify common energy saving opportunities in ammonia refrigeration systems. The results indicate the range of savings that might be expected from common energy efficiency opportunities.

  11. Standard hydrogen monitoring system - E operation and maintenance manual

    SciTech Connect (OSTI)

    Schneider, T.C.

    1997-06-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

  12. Case Study: Driving Operational Changes Through an Energy Monitoring System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    reporting, checklists, energy targets, and feedback leads to effective organizational change. Driving Operational Changes Through an Energy Monitoring System In 2006, IBM launched a corporate effciency program focused on basic operation im- provements in its diverse and far-fung real estate operations. The effciency program had behavior change as a major focus. Examples of changes include the following: * IBM implemented a monthly energy reporting system for its various facilities where

  13. Melter feed system 3-way feed valve Auma motorized operator

    SciTech Connect (OSTI)

    Phillips, T.D.; O`Rourke, J.M.

    1987-04-07

    This document discusses the Scale Melter currently testing feed systems. One component of that system is a valve operator, which directs the feed slurry or flush water through the 3-way ball valve to the melter. This valve operator may be causing problems on the TNX Scale Melter by failing to accurately align the feed valve ports.

  14. Solid Waste Information and Tracking System (SWITS) Software Requirements Specification

    SciTech Connect (OSTI)

    MAY, D.L.

    2000-03-22

    This document is the primary document establishing requirements for the Solid Waste Information and Tracking System (SWITS) as it is converted to a client-server architecture. The purpose is to provide the customer and the performing organizations with the requirements for the SWITS in the new environment. This Software Requirement Specification (SRS) describes the system requirements for the SWITS Project, and follows the PHMC Engineering Requirements, HNF-PRO-1819, and Computer Software Qualify Assurance Requirements, HNF-PRO-309, policies. This SRS includes sections on general description, specific requirements, references, appendices, and index. The SWITS system defined in this document stores information about the solid waste inventory on the Hanford site. Waste is tracked as it is generated, analyzed, shipped, stored, and treated. In addition to inventory reports a number of reports for regulatory agencies are produced.

  15. System requirements and design description for the environmental requirements management interface (ERMI)

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1997-09-30

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC.

  16. Fire protection system operating experience review for fusion applications

    SciTech Connect (OSTI)

    Cadwallader, L.C.

    1995-12-01

    This report presents a review of fire protection system operating experiences from particle accelerator, fusion experiment, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of fire protection system component failure rates and fire accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with these systems are discussed, including spurious operation. This information should be useful to fusion system designers and safety analysts, such as the team working on the Engineering Design Activities for the International Thermonuclear Experimental Reactor.

  17. NEUTRONIC REACTOR OPERATIONAL METHOD AND CORE SYSTEM

    DOE Patents [OSTI]

    Winters, C.E.; Graham, C.B.; Culver, J.S.; Wilson, R.H.

    1960-07-19

    Homogeneous neutronic reactor systems are described wherein an aqueous fuel solution is continuously circulated through a spherical core tank. The pumped fuel solution-is injected tangentially into the hollow spherical interior, thereby maintaining vigorous rotation of the solution within the tank in the form of a vortex; gaseous radiolytic decomposition products concentrate within the axial vortex cavity. The evolved gas is continuously discharged through a gas- outlet port registering with an extremity of the vortex cavity. and the solution stream is discharged through an annular liquid outlet port concentrically encircling the gas outlet by virtue of which the vortex and its cavity are maintained precisely axially aligned with the gas outlet. A primary heat exchanger extracts useful heat from the hot effluent fuel solution before its recirculation into the core tank. Hollow cylinders and other alternative core- tank configurations defining geometric volumes of revolution about a principal axis are also covered. AEC's Homogeneous Reactor Experiment No. 1 is a preferred embodiment.

  18. DOE, Invensys Operations Management to Develop, Deploy Operator Training System for Supercritical Coal Power Plants

    Office of Energy Efficiency and Renewable Energy (EERE)

    A new U.S. Department of Energy cooperative research and development agreement to develop, test, and deploy a dynamic simulator and operator training system could eventually help commercialize important carbon capture technologies at the nation’s power plants.

  19. Dynamic Operations Wayfinding System (DOWS) for Nuclear Power Plants

    SciTech Connect (OSTI)

    Boring, Ronald Laurids; Ulrich, Thomas Anthony; Lew, Roger Thomas

    2015-08-01

    A novel software tool is proposed to aid reactor operators in respond- ing to upset plant conditions. The purpose of the Dynamic Operations Wayfind- ing System (DOWS) is to diagnose faults, prioritize those faults, identify paths to resolve those faults, and deconflict the optimal path for the operator to fol- low. The objective of DOWS is to take the guesswork out of the best way to combine procedures to resolve compound faults, mitigate low threshold events, or respond to severe accidents. DOWS represents a uniquely flexible and dy- namic computer-based procedure system for operators.

  20. Computerized Operator Support System ‚Äď Phase II Development

    SciTech Connect (OSTI)

    Ulrich, Thomas A.; Boring, Ronald L.; Lew, Roger T.; Thomas, Kenneth D.

    2015-02-01

    A computerized operator support system (COSS) prototype for nuclear control room process control is proposed and discussed. The COSS aids operators in addressing rapid plant upsets that would otherwise result in the shutdown of the power plant and interrupt electrical power generation, representing significant costs to the owning utility. In its current stage of development the prototype demonstrates four advanced functions operators can use to more efficiently monitor and control the plant. These advanced functions consist of: (1) a synthesized and intuitive high level overview display of system components and interrelations, (2) an enthalpy-based mathematical chemical and volume control system (CVCS) model to detect and diagnose component failures, (3) recommended strategies to mitigate component failure effects and return the plant back to pre-fault status, and (4) computer-based procedures to walk the operator through the recommended mitigation actions. The COSS was demonstrated to a group of operators and their feedback was collected. The operators responded positively to the COSS capabilities and features and indicated the system would be an effective operator aid. The operators also suggested several additional features and capabilities for the next iteration of development. Future versions of the COSS prototype will include additional plant systems, flexible computer-based procedure presentation formats, and support for simultaneous component fault diagnosis and dual fault synergistic mitigation action strategies to more efficiently arrest any plant upsets.

  1. National Ignition Facility sub-system design requirements integrated safety systems SSDR 1.5.4

    SciTech Connect (OSTI)

    Reed, R.; VanArsdall, P.; Bliss, E.

    1996-09-01

    This System Design Requirement document establishes the performance, design, development, and test requirements for the Integrated Safety System, which is part of the NIF Integrated Computer Control System (ICCS).

  2. National Ignition Facility sub-system design requirements automatic alignment system SSDR 1.5.5

    SciTech Connect (OSTI)

    VanArsdall, P.; Bliss, E.

    1996-09-01

    This System Design Requirement document establishes the performance, design, development, and test requirements for the Automatic Alignment System, which is part of the NIF Integrated Computer Control System (ICCS).

  3. MORE operating system: a message oriented resource environment

    SciTech Connect (OSTI)

    Cabral, B.; Poggio, M.

    1986-07-15

    The operating system, MORE (Message Oriented Resource Environment), is designed for a software engineering environment built on the VAXstation II micro-computer. The MORE operating system is based on the message passing model. The hardware configuration of the VAXstation II is described, including a thorough discussion of the hardware operating system support features of the VAX architecture. The software engineering environment that MORE will provide for the user is discussed. The operating system as the application programmer will see it is presented in the form of a system services manual for MORE. The concept of a server in MORE and the objects or resources manipulated by the servers are included. The high level implementation and organization of MORE, the device managers and drivers, and the kernel of MORE are detailed. 17 refs., 17 figs.

  4. Collective operations in a file system based execution model

    DOE Patents [OSTI]

    Shinde, Pravin; Van Hensbergen, Eric

    2013-02-19

    A mechanism is provided for group communications using a MULTI-PIPE synthetic file system. A master application creates a multi-pipe synthetic file in the MULTI-PIPE synthetic file system, the master application indicating a multi-pipe operation to be performed. The master application then writes a header-control block of the multi-pipe synthetic file specifying at least one of a multi-pipe synthetic file system name, a message type, a message size, a specific destination, or a specification of the multi-pipe operation. Any other application participating in the group communications then opens the same multi-pipe synthetic file. A MULTI-PIPE file system module then implements the multi-pipe operation as identified by the master application. The master application and the other applications then either read or write operation messages to the multi-pipe synthetic file and the MULTI-PIPE synthetic file system module performs appropriate actions.

  5. Collective operations in a file system based execution model

    DOE Patents [OSTI]

    Shinde, Pravin; Van Hensbergen, Eric

    2013-02-12

    A mechanism is provided for group communications using a MULTI-PIPE synthetic file system. A master application creates a multi-pipe synthetic file in the MULTI-PIPE synthetic file system, the master application indicating a multi-pipe operation to be performed. The master application then writes a header-control block of the multi-pipe synthetic file specifying at least one of a multi-pipe synthetic file system name, a message type, a message size, a specific destination, or a specification of the multi-pipe operation. Any other application participating in the group communications then opens the same multi-pipe synthetic file. A MULTI-PIPE file system module then implements the multi-pipe operation as identified by the master application. The master application and the other applications then either read or write operation messages to the multi-pipe synthetic file and the MULTI-PIPE synthetic file system module performs appropriate actions.

  6. Charging system with galvanic isolation and multiple operating modes

    DOE Patents [OSTI]

    Kajouke, Lateef A.; Perisic, Milun; Ransom, Ray M.

    2013-01-08

    Systems and methods are provided for operating a charging system with galvanic isolation adapted for multiple operating modes. A vehicle charging system comprises a DC interface, an AC interface, a first conversion module coupled to the DC interface, and a second conversion module coupled to the AC interface. An isolation module is coupled between the first conversion module and the second conversion module. The isolation module comprises a transformer and a switching element coupled between the transformer and the second conversion module. The transformer and the switching element are cooperatively configured for a plurality of operating modes, wherein each operating mode of the plurality of operating modes corresponds to a respective turns ratio of the transformer.

  7. Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure

    Office of Environmental Management (EM)

    Corrective Action Standard Operating Procedure (ECASOP) Issued by Office of Project Management, Oversight, and Assessments (PMOA) PM-1 September 21, 2015 DEPARTMENT OF ENERGY EVMS CORRECTIVE ACTION SOP SEPTEMBER 21, 2015 ii Earned Value Management System (EVMS) Corrective Action (CA) Standard Operating Procedure (ECASOP) OPR: PM-30 Issue Date: September 21, 2015 1. PURPOSE. This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as a primary reference for PMOA PM-1 for

  8. Pellet property requirements for future blast-furnace operations and other new ironmaking processes

    SciTech Connect (OSTI)

    Agrawal, A.K.; Oshnock, T.W.

    1995-12-01

    The requirements for the physical, chemical and metallurgical properties of pellets have continued to become more stringent as blast-furnace productivity and coke rate have been rapidly improved during the last decade. In addition, the age and deterioration of the North American coke batteries, the lack of capital to sufficiently rebuild them, and the threat of increasingly more stringent environmental controls for the coke batteries has forced North American ironmakers to begin implementing pulverized coal injection to minimize the coke requirements for the blast furnace and to seriously investigate developing other ironmaking processes that use coal instead of coke. Therefore, the next major step in North American ironmaking has included injecting pulverized coal (PC) at 200 kilograms per ton of hot metal (kg/ton) [400 pounds per net ton of hot metal (lb/NTHM)] or greater which will result in the coke rate decreasing to less than 300 kg/ton (600 lb/NTHM) or less. As a result, the pellets will spend more time in the furnace and will be required to support more total weight. Pellets can also be a major iron unit source for other cokeless ironmaking processes such as the COREX process or the AISI direct ironmaking process. This paper will explore the pellet property requirements for future blast-furnace operations and cokeless ironmaking processes.

  9. Engine systems and methods of operating an engine

    SciTech Connect (OSTI)

    Scotto, Mark Vincent

    2015-08-25

    One embodiment of the present invention is a unique method for operating an engine. Another embodiment is a unique engine system. Other embodiments include apparatuses, systems, devices, hardware, methods, and combinations for engines and engine systems. Further embodiments, forms, features, aspects, benefits, and advantages of the present application will become apparent from the description and figures provided herewith.

  10. Tank waste remediation system functions and requirements document

    SciTech Connect (OSTI)

    Carpenter, K.E

    1996-10-03

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.

  11. Balance-of-System Equipment Required for Renewable Energy Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... For both stand-alone and grid-connected systems, you will need power conditioning equipment. Most electrical appliances ... Virtually all the available renewable energy technologies, ...

  12. EIS-0170: Columbia River System Operation Review, BPA Area

    Broader source: Energy.gov [DOE]

    The Columbia River System Operation Review Final Environmental Impact Statement (EIS) evaluates the potential impacts of four alternatives that represent the likely range of allocations between the Federal and non-Federal projects.

  13. EA-227-A New York Independent System Operator | Department of...

    Office of Environmental Management (EM)

    energy OE docket No. EA-227-A New York Independent System Operator, Inc EA-137-A New York State Electric and Gas Corporation EA-157-A Consolidated Edison Company of New York, Inc...

  14. EA-227 New York Independent System Operator Inc | Department...

    Office of Environmental Management (EM)

    EA-227 New York Independent System Operator Inc More Documents & Publications EA-220-A NRG Power Marketing, Inc EA-122-A Dynegy Power Marketing, Inc EA-232 OGE Energy Resources...

  15. Operating experience review of service water system problems

    SciTech Connect (OSTI)

    Lam, P.

    1989-01-01

    In a recent paper, selected results of a comprehensive review and evaluation of service water system problems conducted by the Office for Analysis and Evaluation of Operational Data (AEOD) of the US Nuclear Regulatory Commission (NRC) were presented. The results of this review and evaluation indicated that service water system problems have significant safety implications. These system problems are attributable to a great variety of causes and have adverse impacts on a large number of safety-related systems and components. To provide additional feedback of operating experience, this paper presents an overview of the dominant mechanisms leading to service water system degradations and failures. The failures and degradations of service water systems observed in the 276 operating events are grouped into six general categories. The six general categories are (1) fouling due to various mechanisms, (2) single-failure and other design deficiencies, (3) flooding, (4) equipment failures, (5) personnel and procedural errors, and (6) seismic deficiencies.

  16. Quench monitoring and control system and method of operating same

    DOE Patents [OSTI]

    Ryan, David Thomas; Laskaris, Evangelos Trifon; Huang, Xianrui

    2006-05-30

    A rotating machine comprising a superconductive coil and a temperature sensor operable to provide a signal representative of superconductive coil temperature. The rotating machine may comprise a control system communicatively coupled to the temperature sensor. The control system may be operable to reduce electric current in the superconductive coil when a signal representative of a defined superconducting coil temperature is received from the temperature sensor.

  17. Requirements Management System Browser (RMSB) software design description

    SciTech Connect (OSTI)

    Frank, D.D.

    1996-09-30

    The purpose of this document is to provide an ``as-built`` design description for the Requirements Management System Browser (RMSB) application. The Graphical User Interface (GUI) and database structure design are described for the RMSB application, referred to as the ``Browser.`` The RMSB application provides an easy to use PC-based interface to browse systems engineering data stored and managed in a UNIX software application. The system engineering data include functions, requirements, and architectures that make up the Tank Waste Remediation System (TWRS) technical baseline.

  18. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    SciTech Connect (OSTI)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.

  19. HPC Colony II: FAST_OS II: Operating Systems and Runtime Systems...

    Office of Scientific and Technical Information (OSTI)

    Title: HPC Colony II: FASTOS II: Operating Systems and Runtime Systems at Extreme Scale ... task made difficult by the emerging variety of more complex computer architectures. ...

  20. Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

    SciTech Connect (OSTI)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    2015-10-19

    The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

  1. Assessment of a large break loss of coolant accident scenario requiring operator action to initiate safety injection

    SciTech Connect (OSTI)

    Grendys, R.C.; Nissley, M.E.; Baker, D.C.

    1996-11-01

    As part of the licensing basis for a nuclear power plant, the acceptability of the Emergency Core Cooling Systems (ECCS) following a postulated Loss-of-Coolant Accident (LOCA) as described in the Code of Federal Regulations (CFR), Title 10, Chapter 1, Part 50.46, must be verified. The LOCA analysis is performed with an acceptable ECCS Evaluation Model and results must show compliance with the 10 CFR 50.46 acceptance criteria. Westinghouse Electric Corporation performs Large and Small Break LOCA and LOCA-related analyses to support the licensing basis of various nuclear power plants and also performs evaluations against the licensing basis analyses as required. Occasionally, the need arises for the holder of an operating license of a nuclear power plant to submit a Licensee Event Report (LER) to the US Nuclear Regulatory Commission (USNRC) for any event of the type described in the Code of Federal Regulations, Title 10, Chapter 1, Part 50.73. To support the LER, a Justification for Past Operation (JPO) may be performed to assess the safety consequences and implications of the event based on previous operating conditions. This paper describes the work performed for the Large Break LOCA to assess the impact of an event discovered by Florida Power and Light and reported in LER-94-005-02. For this event, it was determined that under certain circumstances, operator action would have been required to initiate safety injection (SI), thus challenging the acceptability of the ECCS. This event was specifically addressed for the Large Break LOCA by using an advanced thermal hydraulic analysis methodology with realistic input assumptions.

  2. Process for Managing and Customizing HPC Operating Systems

    SciTech Connect (OSTI)

    Brown, David ML

    2014-04-02

    A process for maintaining a custom HPC operating system was developed at the Environmental Molecular Sciences Laboratory (EMSL) over the past ten years. This process is generic and flexible to manage continuous change as well as keep systems updated while managing communication through well defined pieces of software.

  3. Cryogenic system operating experience review for fusion applications

    SciTech Connect (OSTI)

    Cadwallader, L.C.

    1992-01-01

    This report presents a review of cryogenic system operating experiences, from particle accelerator, fusion experiment, space research, and other applications. Safety relevant operating experiences and accident information are discussed. Quantitative order-of-magnitude estimates of cryogenic component failure rates and accident initiating event frequencies are presented for use in risk assessment, reliability, and availability studies. Safety concerns with cryogenic systems are discussed, including ozone formation, effects of spills, and modeling spill behavior. This information should be useful to fusion system designers and safety analysts, such as the team working on the International Thermonuclear Experimental Reactor design.

  4. Holistic Evaluation of Lightweight Operating Systems using the PERCU Method

    SciTech Connect (OSTI)

    Kramer, William T.C.; He, Yun; Carter, Jonathan; Glenski, Joseph; Rippe, Lynn; Cardo, Nicholas

    2008-05-01

    The scale of Leadership Class Systems presents unique challenges to the features and performance of operating system services. This paper reports results of comprehensive evaluations of two Light Weight Operating Systems (LWOS), Cray's Catamount Virtual Node (CVN) and Linux Environment (CLE) operating systems, on the exact same large-scale hardware. The evaluation was carried out over a 5-month period on NERSC's 19,480 core Cray XT-4, Franklin, using a comprehensive evaluation method that spans Performance, Effectiveness, Reliability, Consistency and Usability criteria for all major subsystems and features. The paper presents the results of the comparison between CVN and CLE, evaluates their relative strengths, and reports observations regarding the world's largest Cray XT-4 as well.

  5. National Ignition Facility sub-system design requirements integrated timing system SSDR 1.5.3

    SciTech Connect (OSTI)

    Wiedwald, J.; Van Aersau, P.; Bliss, E.

    1996-08-26

    This System Design Requirement document establishes the performance, design, development, and test requirements for the Integrated Timing System, WBS 1.5.3 which is part of the NIF Integrated Computer Control System (ICCS). The Integrated Timing System provides all temporally-critical hardware triggers to components and equipment in other NIF systems.

  6. National Ignition Facility sub-system design requirements computer system SSDR 1.5.1

    SciTech Connect (OSTI)

    Spann, J.; VanArsdall, P.; Bliss, E.

    1996-09-05

    This System Design Requirement document establishes the performance, design, development and test requirements for the Computer System, WBS 1.5.1 which is part of the NIF Integrated Computer Control System (ICCS). This document responds directly to the requirements detailed in ICCS (WBS 1.5) which is the document directly above.

  7. The Nevada railroad system: Physical, operational, and accident characteristics

    SciTech Connect (OSTI)

    1991-09-01

    This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

  8. Identifying Challenging Operating Hours for Solar Intergration in the NV Energy System

    SciTech Connect (OSTI)

    Etingov, Pavel V.; Lu, Shuai; Guo, Xinxin; Ma, Jian; Makarov, Yuri V.; Chadliev, Vladimir; Salgo, Richard

    2012-05-09

    Abstract-- In this paper, the ability of the Nevada (NV) Energy generation fleet to meet its system balancing requirements under different solar energy penetration scenarios is studied. System balancing requirements include capacity, ramp rate, and ramp duration requirements for load following and regulation. If, during some operating hours, system capability is insufficient to meet these requirements, there is certain probability that the balancing authorityís control and reliability performance can be compromised. These operating hours are considered as ďchallengingĒ hours. Five different solar energy integration scenarios have been studied. Simulations have shown that the NV Energy system will be potentially able to accommodate up to 942 MW of solar photovoltaic (PV) generation. However, the existing generation scheduling procedure should be adjusted to make it happen. Fast-responsive peaker units need to be used more frequently to meet the increasing ramping requirements. Thus, the NV Energy system operational cost can increase. Index TermsóSolar Generation, Renewables Integration, Balancing Process, Load Following, Regulation.

  9. Opportunities for sustainable design and operation of cleanspaces: A case study on minienvironment system performance

    SciTech Connect (OSTI)

    Xu, Tengfang

    2005-05-01

    In order to identify and pursue energy efficiency opportunities associated with cleanrooms, it is necessary to understand the design and operation of cleanroom systems for specific contamination control requirements. With the industrial trend toward more stringent cleanliness class and tightening clean spaces, it is vital to understand the design of minienvironment and the operational performance of its systems. A good understanding of such system performance would help to identify opportunities in efficient energy end-use and wise allocation of resources associated with processes or productions that require minienvironments and cleanrooms. This report summarizes a case study on energy performance of a common minienvironment used in semiconductor industry, and discusses the opportunities in saving energy, in particular, the opportunities in achieving efficient operation and design that entails applications of minienvironments.

  10. Operability test procedure for rotary mode core sampling system {number_sign}4

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  11. Operability test procedure for rotary mode core sampling system {number_sign}3

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  12. Integration of Uncertainty Information into Power System Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Lu, Shuai; Samaan, Nader A.; Huang, Zhenyu; Subbarao, Krishnappa; Etingov, Pavel V.; Ma, Jian; Hafen, Ryan P.; Diao, Ruisheng; Lu, Ning

    2011-10-10

    Contemporary power systems face uncertainties coming from multiple sources, including forecast errors of load, wind and solar generation, uninstructed deviation and forced outage of traditional generators, loss of transmission lines, and others. With increasing amounts of wind and solar generation being integrated into the system, these uncertainties have been growing significantly. It is critical important to build knowledge of major sources of uncertainty, learn how to simulate them, and then incorporate this information into the decision-making processes and power system operations, for better reliability and efficiency. This paper gives a comprehensive view on the sources of uncertainty in power systems, important characteristics, available models, and ways of their integration into system operations. It is primarily based on previous works conducted at the Pacific Northwest National Laboratory (PNNL).

  13. Method for operating a combustor in a fuel cell system

    DOE Patents [OSTI]

    Clingerman, Bruce J.; Mowery, Kenneth D.

    2002-01-01

    In one aspect, the invention provides a method of operating a combustor to heat a fuel processor to a desired temperature in a fuel cell system, wherein the fuel processor generates hydrogen (H.sub.2) from a hydrocarbon for reaction within a fuel cell to generate electricity. More particularly, the invention provides a method and select system design features which cooperate to provide a start up mode of operation and a smooth transition from start-up of the combustor and fuel processor to a running mode.

  14. The Initial Development of a Computerized Operator Support System

    SciTech Connect (OSTI)

    Roger Lew; Ronald L Boring; Thomas A Ulrich; Ken Thomas

    2014-08-01

    A computerized operator support system (COSS) is a collection of resilient software technologies to assist operators in monitoring overall nuclear power plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast- moving, complex events. A prototype COSS for a chemical volume control system at a nuclear power plant has been developed in order to demonstrate the concept and provide a test bed for further research. The development process identified four underlying elements necessary for the prototype, which consist of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. An operational prototype resides at the Idaho National Laboratory (INL) using the U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). Several human-machine interface (HMI) considerations are identified and incorporated in the prototype during this initial round of development.

  15. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    SciTech Connect (OSTI)

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  16. Monitoring, safety systems for LNG and LPG operators

    SciTech Connect (OSTI)

    True, W.R.

    1998-11-16

    Operators in Korea and Australia have chosen monitoring and control systems in recent contracts for LNG and LPG storage. Korea Gas Corp. (Kogas) has hired Whessoe Varec, Calais, to provide monitoring systems for four LNG storage tanks being built at Kogas` Inchon terminal. For Elgas Ltd., Port Botany, Australia, Whessoe Varec has already shipped a safety valve-shutdown system to a new LPG cavern-storage facility under construction. The paper describes the systems, terminal monitoring, dynamic approach to tank management, and meeting the growing demand for LPG.

  17. Cold weather hydrogen generation system and method of operation

    DOE Patents [OSTI]

    Dreier, Ken Wayne; Kowalski, Michael Thomas; Porter, Stephen Charles; Chow, Oscar Ken; Borland, Nicholas Paul; Goyette, Stephen Arthur

    2010-12-14

    A system for providing hydrogen gas is provided. The system includes a hydrogen generator that produces gas from water. One or more heat generation devices are arranged to provide heating of the enclosure during different modes of operation to prevent freezing of components. A plurality of temperature sensors are arranged and coupled to a controller to selectively activate a heat source if the temperature of the component is less than a predetermined temperature.

  18. DEVELOPMENT OF OPERATIONAL CONCEPTS FOR ADVANCED SMRs: THE ROLE OF COGNITIVE SYSTEMS ENGINEERING

    SciTech Connect (OSTI)

    Jacques Hugo; David Gertman

    2014-04-01

    Advanced small modular reactors (AdvSMRs) will use advanced digital instrumentation and control systems, and make greater use of automation. These advances not only pose technical and operational challenges, but will inevitably have an effect on the operating and maintenance (O&M) cost of new plants. However, there is much uncertainty about the impact of AdvSMR designs on operational and human factors considerations, such as workload, situation awareness, human reliability, staffing levels, and the appropriate allocation of functions between the crew and various automated plant systems. Existing human factors and systems engineering design standards and methodologies are not current in terms of human interaction requirements for dynamic automated systems and are no longer suitable for the analysis of evolving operational concepts. New models and guidance for operational concepts for complex socio-technical systems need to adopt a state-of-the-art approach such as Cognitive Systems Engineering (CSE) that gives due consideration to the role of personnel. This approach we report on helps to identify and evaluate human challenges related to non-traditional concepts of operations. A framework - defining operational strategies was developed based on the operational analysis of Argonne National Laboratory’s Experimental Breeder Reactor-II (EBR-II), a small (20MWe) sodium-cooled reactor that was successfully operated for thirty years. Insights from the application of the systematic application of the methodology and its utility are reviewed and arguments for the formal adoption of CSE as a value-added part of the Systems Engineering process are presented.

  19. HEMP emergency planning and operating procedures for electric power systems

    SciTech Connect (OSTI)

    Reddoch, T.W.; Markel, L.C. )

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  20. System for controlling the operating temperature of a fuel cell

    DOE Patents [OSTI]

    Fabis, Thomas R.; Makiel, Joseph M.; Veyo, Stephen E.

    2006-06-06

    A method and system are provided for improved control of the operating temperature of a fuel cell (32) utilizing an improved temperature control system (30) that varies the flow rate of inlet air entering the fuel cell (32) in response to changes in the operating temperature of the fuel cell (32). Consistent with the invention an improved temperature control system (30) is provided that includes a controller (37) that receives an indication of the temperature of the inlet air from a temperature sensor (39) and varies the heat output by at least one heat source (34, 36) to maintain the temperature of the inlet air at a set-point T.sub.inset. The controller (37) also receives an indication of the operating temperature of the fuel cell (32) and varies the flow output by an adjustable air mover (33), within a predetermined range around a set-point F.sub.set, in order to maintain the operating temperature of the fuel cell (32) at a set-point T.sub.opset.

  1. WinCal system configuration control board (SCCB) operating procedure

    SciTech Connect (OSTI)

    Westsik, G.A.

    1997-03-26

    This document describes the operating procedure for the System Configuration Control Board (SCCB) performed in support of the Windows Calorimeter Control (WinCal) system. This board will consist of representatives from Babcock & Wilcox Hanford Company Babcock & Wilcox Protec, Inc.; and Lockheed Martin Services, Inc. In accordance with agreements for the joint use of the Babcock & Wilcox Hanford Company calorimeters located in the Hanford Site Plutonium Finishing Plant (PFP) Nondestructive Assay Laboratory, concurrence regarding changes to the WinCal system will be obtained from the International Atomic Energy Agency (IAEA). Further, changes to the WinCal software will be communicated to Los Alamos National Laboratory.

  2. The D0 level 3 DAQ system: operation and upgrades

    SciTech Connect (OSTI)

    Garcia-Bellido, Aran; Bose, Tulika; Brooijmans, Gustaaf; Chapin, Doug; Cutts, David; Fuess, Stuart; Gadfort, Thomas; Haas, Andrew; Lee, William; Rechenmacher, Ron; Snyder, Scott; /Washington U., Seattle /Brown U. /Columbia U. /Fermilab /Brookhaven

    2007-05-01

    The D{O} Level 3 data acquisition system for Run II of the Tevatron has been reliably operating since May 2002. Designed to handle average event sizes of 250 kilobytes at a rate of 1 kHz, the system has been upgraded to be able to process more events, doubling its typical output rate from 50 Hz to 100 Hz, while coping with higher event sizes at the beginning of high luminosity collider stores. The system routes and transfers event fragments from 63 VME crates to any of approximately 320 processing nodes. The addition of more farm nodes, the performance of the components, and the running experience are described here.

  3. Assessment of Offshore Wind System Design, Safety, and Operation Standards

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract No. DE-AC36-08GO28308 Assessment of Offshore Wind System Design, Safety, and Operation Standards Senu Sirnivas and Walt Musial National Renewable Energy Laboratory Bruce Bailey and Matthew Filippelli AWS Truepower LLC Technical Report NREL/TP-5000-60573 January 2014 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC. This report is available at no cost from the National

  4. Systems and methods for analyzing building operations sensor data

    DOE Patents [OSTI]

    Mezic, Igor; Eisenhower, Bryan A.

    2015-05-26

    Systems and methods are disclosed for analyzing building sensor information and decomposing the information therein to a more manageable and more useful form. Certain embodiments integrate energy-based and spectral-based analysis methods with parameter sampling and uncertainty/sensitivity analysis to achieve a more comprehensive perspective of building behavior. The results of this analysis may be presented to a user via a plurality of visualizations and/or used to automatically adjust certain building operations. In certain embodiments, advanced spectral techniques, including Koopman-based operations, are employed to discern features from the collected building sensor data.

  5. Functional and operational requirements document : building 1012, Battery and Energy Storage Device Test Facility, Sandia National Laboratories, New Mexico.

    SciTech Connect (OSTI)

    Johns, William H.

    2013-11-01

    This report provides an overview of information, prior studies, and analyses relevant to the development of functional and operational requirements for electrochemical testing of batteries and energy storage devices carried out by Sandia Organization 2546, Advanced Power Sources R&D. Electrochemical operations for this group are scheduled to transition from Sandia Building 894 to a new Building located in Sandia TA-II referred to as Building 1012. This report also provides background on select design considerations and identifies the Safety Goals, Stakeholder Objectives, and Design Objectives required by the Sandia Design Team to develop the Performance Criteria necessary to the design of Building 1012. This document recognizes the Architecture-Engineering (A-E) Team as the primary design entity. Where safety considerations are identified, suggestions are provided to provide context for the corresponding operational requirement(s).

  6. Development of automatic operation system for coke oven machines at Yawata Works of Nippon Steel Corporation

    SciTech Connect (OSTI)

    Matsunaga, Masao; Uematsu, Hiroshi; Nakagawa, Yoji; Ishiharaguchi, Yuji

    1995-12-01

    The coke plant is a working environment involving heavy dust emissions, high heat and demanding physical labor. The labor-saving operation of the coke plant is an essential issue from the standpoints of not only improvement in working environment, but also reduction in fixed cost by enhancement of labor productivity. Under these circumstances, Nippon Steel has implemented the automation of coke oven machines. The first automatic operation system for coke oven machinery entered service at Oita Works in 1992, followed by the second system at the No. 5 coke oven battery of the coke plant at Yawata Works. The Yawata automatic operation system is characterized by the installation of coke oven machinery to push as many as 140 ovens per day within a short cycle time, such as a preliminary ascension pipe cap opening car and cycle time simulator by the manned operation of the pusher, which is advantageous from the standpoint of investment efficiency, and by the monitoring of other oven machines by the pusher. These measures helped to reduce the manpower requirement to 2 persons per shift from 4 persons per shift. The system entered commercial operation in March, 1994 and has been smoothly working with an average total automatic rate of 97%. Results from the startup to recent operation of the system are reported below.

  7. Establishing functional requirements for emergency management information systems

    SciTech Connect (OSTI)

    Reed, J.H.; Rogers, G.O.; Sorensen, J.H.

    1991-01-01

    The advancement of computer technologies has led to the development of a number of emergency management information systems (e.g., EIS, CAMEO, IEMIS). The design of these systems has tended to be technologically driven rather than oriented to meeting information management needs during an emergency. Of course, emergency management needs vary depending on the characteristics of the emergency. For example, in hurricanes, onset is typically slow enough to allow emergency managers to simulate evacuations dynamically while in chemical disasters onset may be sufficiently rapid to preclude such simulation(s). This paper describes a system design process in which the analysis of widely recognized emergency management functions was used to identify information requirements and the requisite software and hardware capabilities to deal with rapid onset, low probability, high consequence events. These requirements were then implemented as a prototype emergency management system using existing hardware and software to assure feasibility. Data, hardware, and software requirements were further developed, refined, and made more concrete through an iterative prototyping effort. This approach focuses attention directly on meeting emergency management information needs while avoiding unneeded technological innovations. 10 refs., 4 figs., 1 tab.

  8. NGSI: FUNCTION REQUIREMENTS FOR A CYLINDER TRACKING SYSTEM

    SciTech Connect (OSTI)

    Branney, S.

    2012-06-06

    While nuclear suppliers currently track uranium hexafluoride (UF{sub 6}) cylinders in various ways, for their own purposes, industry practices vary significantly. The NNSA Office of Nonproliferation and International Security's Next Generation Safeguards Initiative (NGSI) has begun a 5-year program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF{sub 6} cylinders. As part of this effort, NGSI's multi-laboratory team has documented the 'life of a UF{sub 6} cylinder' and reviewed IAEA practices related to UF{sub 6} cylinders. Based on this foundation, this paper examines the functional requirements of a system that would uniquely identify and track UF{sub 6} cylinders. There are many considerations for establishing a potential tracking system. Some of these factors include the environmental conditions a cylinder may be expected to be exposed to, where cylinders may be particularly vulnerable to diversion, how such a system may be integrated into the existing flow of commerce, how proprietary data generated in the process may be protected, what a system may require in terms of the existing standard for UF{sub 6} cylinder manufacture or modifications to it and what the limiting technology factors may be. It is desirable that a tracking system should provide benefit to industry while imposing as few additional constraints as possible and still meeting IAEA safeguards objectives. This paper includes recommendations for this system and the analysis that generated them.

  9. LANL OPERATING EXPERIENCE WITH THE WAND AND HERCULES PROTOTYPE SYSTEMS

    SciTech Connect (OSTI)

    K. M. GRUETZMACHER; C. L. FOXX; S. C. MYERS

    2000-09-01

    The Waste Assay for Nonradioactive Disposal (WAND) and the High Efficiency Radiation Counters for Ultimate Low Emission Sensitivity (HERCULES) prototype systems have been operating at Los Alamos National Laboratory's (LANL's) Solid Waste Operation's (SWO'S) non-destructive assay (NDA) building since 1997 and 1998, respectively. These systems are the cornerstone of the verification program for low-density Green is Clean (GIC) waste at the Laboratory. GIC waste includes all non-regulated waste generated in radiological controlled areas (RCAS) that has been actively segregated as clean (i.e., nonradioactive) through the use of waste generator acceptable knowledge (AK). The use of this methodology alters LANL's past practice of disposing of all room trash generated in nuclear facilities in radioactive waste landfills. Waste that is verified clean can be disposed of at the Los Alamos County Landfill. It is estimated that 50-90% of the low-density room trash from radioactive material handling areas at Los Alamos might be free of contamination. This approach avoids the high cost of disposal of clean waste at a radioactive waste landfill. It also reduces consumption of precious space in the radioactive waste landfill where disposal of this waste provides no benefit to the public or the environment. Preserving low level waste (LLW) disposal capacity for truly radioactive waste is critical in this era when expanding existing radioactive waste landfills or permitting new ones is resisted by regulators and stakeholders. This paper describes the operating experience with the WAND and HERCULES since they began operation at SWO. Waste for verification by the WAND system has been limited so far to waste from the Plutonium Facility and the Solid Waste Operations Facility. A total of461 ft3 (13.1 m3) of low-density shredded waste and paper have been verified clean by the WAND system. The HERCULES system has been used to verify waste from four Laboratory facilities. These are the

  10. Applications of Optimal Building Energy System Selection and Operation

    SciTech Connect (OSTI)

    Marnay, Chris; Stadler, Michael; Siddiqui, Afzal; DeForest, Nicholas; Donadee, Jon; Bhattacharya, Prajesh; Lai, Judy

    2011-04-01

    Berkeley Lab has been developing the Distributed Energy Resources Customer Adoption Model (DER-CAM) for several years. Given load curves for energy services requirements in a building microgrid (u grid), fuel costs and other economic inputs, and a menu of available technologies, DER-CAM finds the optimum equipment fleet and its optimum operating schedule using a mixed integer linear programming approach. This capability is being applied using a software as a service (SaaS) model. Optimisation problems are set up on a Berkeley Lab server and clients can execute their jobs as needed, typically daily. The evolution of this approach is demonstrated by description of three ongoing projects. The first is a public access web site focused on solar photovoltaic generation and battery viability at large commercial and industrial customer sites. The second is a building CO2 emissions reduction operations problem for a University of California, Davis student dining hall for which potential investments are also considered. And the third, is both a battery selection problem and a rolling operating schedule problem for a large County Jail. Together these examples show that optimization of building u grid design and operation can be effectively achieved using SaaS.

  11. Heating and current drive requirements towards steady state operation in ITER

    SciTech Connect (OSTI)

    Poli, F. M.; Kessel, C. E.; Gorelenkova, M.; Bonoli, P. T.; Batchelor, D. B.; Harvey, B.; Petrov, Y.

    2014-02-12

    Steady state scenarios envisaged for ITER aim at optimizing the bootstrap current, while maintaining sufficient confinement and stability to provide the necessary fusion yield. Non-inductive scenarios will need to operate with Internal Transport Barriers (ITBs) in order to reach adequate fusion gain at typical currents of 9 MA. However, the large pressure gradients associated with ITBs in regions of weak or negative magnetic shear can be conducive to ideal MHD instabilities, reducing the no-wall limit. The E √ó B flow shear from toroidal plasma rotation is expected to be low in ITER, with a major role in the ITB dynamics being played by magnetic geometry. Combinations of H/CD sources that maintain weakly reversed magnetic shear profiles throughout the discharge are the focus of this work. Time-dependent transport simulations indicate that, with a trade-off of the EC equatorial and upper launcher, the formation and sustainment of quasi-steady state ITBs could be demonstrated in ITER with the baseline heating configuration. However, with proper constraints from peeling-ballooning theory on the pedestal width and height, the fusion gain and the maximum non-inductive current are below the ITER target. Upgrades of the heating and current drive system in ITER, like the use of Lower Hybrid current drive, could overcome these limitations, sustaining higher non-inductive current and confinement, more expanded ITBs which are ideal MHD stable.

  12. An extensible operating system design for large-scale parallel machines.

    SciTech Connect (OSTI)

    Riesen, Rolf E.; Ferreira, Kurt Brian

    2009-04-01

    Running untrusted user-level code inside an operating system kernel has been studied in the 1990's but has not really caught on. We believe the time has come to resurrect kernel extensions for operating systems that run on highly-parallel clusters and supercomputers. The reason is that the usage model for these machines differs significantly from a desktop machine or a server. In addition, vendors are starting to add features, such as floating-point accelerators, multicore processors, and reconfigurable compute elements. An operating system for such machines must be adaptable to the requirements of specific applications and provide abstractions to access next-generation hardware features, without sacrificing performance or scalability.

  13. Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure

    Broader source: Energy.gov [DOE]

    This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as PM's primary reference for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of contractors procedures and implementation associated with Variance Analysis Reports (VARs) and Corrective Action Plans (CAPs) in accordance with the EIA-748 (current version) EVMS standard. The SOP is based on regulatory guidance and standardized processes based upon a common understanding of EVMS Industry and Government best practices for use by the Department of Energy (DOE). All information contained herein provides detailed processes to implement the requirements in DOE O 413.3 Current Version.

  14. Microsecond delays on non-real time operating systems

    SciTech Connect (OSTI)

    Angstadt, R.; Estrada, J.; Diehl, H.T.; Flaugher, B.; Johnson, M.; /Fermilab

    2007-05-01

    We have developed microsecond timing and profiling software that runs on standard Windows and Linux based operating systems. This software is orders of magnitudes better than most of the standard native functions in wide use. Our software libraries calibrate RDTSC in microseconds or seconds to provide two different types of delays: a ''Guaranteed Minimum'' and a precision ''Long Delay'', which releases to the kernel. Both return profiling information of the actual delay.

  15. WRAP 1, operational test report 80X non-destructive examination system

    SciTech Connect (OSTI)

    Bottenus, R.J.

    1997-04-14

    This Operational Test Report was performed to verify the WRAP 1 Facility 80X Non-Destructive Examination systems operate in accordance with the system designs and specifications.

  16. Technology Solutions Case Study: Hydronic Systems: Designing for Setback Operation

    SciTech Connect (OSTI)

    2014-05-01

    For years, conventional wisdom surrounding space heating has specified two points: size the mechanical systems to the heating loads, and setting the thermostat back at night will result in energy savings. The problem is these two recommendations oppose each other. A system that is properly sized to the heating load will not have the extra capacity necessary to recover from a thermostat setback, especially at design conditions. Properly designing a hydronic system for setback operation can be accomplished but depends on several factors. Determining the appropriateness of setback for a particular project is the first step. This is followed by proper sizing of the boiler and baseboard to ensure the needed capacity can be met. Finally, control settings must be chosen that result in the most efficient and responsive performance. This guide provides step-by-step instructions for heating contractors and hydronic designers for selecting the proper control settings to maximize system performance and improve response time when using a thermostat setback.

  17. Method and apparatus to predict the remaining service life of an operating system

    DOE Patents [OSTI]

    Greitzer, Frank L.; Kangas, Lars J.; Terrones, Kristine M.; Maynard, Melody A.; Pawlowski, Ronald A. , Ferryman; Thomas A.; Skorpik, James R.; Wilson, Bary W.

    2008-11-25

    A method and computer-based apparatus for monitoring the degradation of, predicting the remaining service life of, and/or planning maintenance for, an operating system are disclosed. Diagnostic information on degradation of the operating system is obtained through measurement of one or more performance characteristics by one or more sensors onboard and/or proximate the operating system. Though not required, it is preferred that the sensor data are validated to improve the accuracy and reliability of the service life predictions. The condition or degree of degradation of the operating system is presented to a user by way of one or more calculated, numeric degradation figures of merit that are trended against one or more independent variables using one or more mathematical techniques. Furthermore, more than one trendline and uncertainty interval may be generated for a given degradation figure of merit/independent variable data set. The trendline(s) and uncertainty interval(s) are subsequently compared to one or more degradation figure of merit thresholds to predict the remaining service life of the operating system. The present invention enables multiple mathematical approaches in determining which trendline(s) to use to provide the best estimate of the remaining service life.

  18. Requirements and design concept for a facility mapping system

    SciTech Connect (OSTI)

    Barry, R.E.; Burks, B.L.; Little, C.Q.

    1995-02-01

    The Department of Energy (DOE) has for some time been considering the Decontamination and Dismantlement (D&D) of facilities which are no longer in use, but which are highly contaminated with radioactive wastes. One of the holdups in performing the D&D task is the accumulation of accurate facility characterizations that can enable a safe and orderly cleanup process. According to the Technical Strategic Plan for the Decontamination and Decommissioning Integrated Demonstration, {open_quotes}the cost of characterization using current baseline technologies for approximately 100 acres of gaseous diffusion plant at Oak Ridge alone is, for the most part incalculable{close_quotes}. Automated, robotic techniques will be necessary for initial characterization and continued surveillance of these types of sites. Robotic systems are being designed and constructed to accomplish these tasks. This paper describes requirements and design concepts for a system to accurately map a facility contaminated with hazardous wastes. Some of the technologies involved in the Facility Mapping System are: remote characterization with teleoperated, sensor-based systems, fusion of data sets from multiple characterization systems, and object recognition from 3D data models. This Facility Mapping System is being assembled by Oak Ridge National Laboratory for the DOE Office of Technology Development Robotics Technology Development Program.

  19. Operating experience review - Ventilation systems at Department of Energy Facilities

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  20. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report

    SciTech Connect (OSTI)

    Lee Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  1. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request

    SciTech Connect (OSTI)

    L. Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  2. Driving Operational Changes through an Energy Monitoring System

    SciTech Connect (OSTI)

    2012-08-01

    Institutional change case study details IBM's corporate efficiency program focused on basic operation improvements in its diverse real estate operations.

  3. UCRL-ID-120738 L-20072-1 NIF System-Design Requirements for

    Office of Scientific and Technical Information (OSTI)

    NIF System-Design Requirements for Nuclear-Weapons Physics Experiments Theodore S. ... NIF System-Design Requirements for Nuclear-Weapons Physics Experiments April 1995 ...

  4. Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

    SciTech Connect (OSTI)

    Eto, Joseph H.; Undrill, John; Mackin, Peter; Daschmans, Ron; Williams, Ben; Haney, Brian; Hunt, Randall; Ellis, Jeff; Illian, Howard; Martinez, Carlos; O'Malley, Mark; Coughlin, Katie; LaCommare, Kristina Hamachi

    2010-12-20

    An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

  5. Foreign Affairs Information System (FAIS) Early Operational Capability (EOC) network security criteria

    SciTech Connect (OSTI)

    Not Available

    1988-09-12

    The Joint Center for Information Security Technology (JCIST) at Oak Ridge, Tennessee, under an interagency agreement between the Department of State (DOS) and the Department of Energy (DOE), has been tasked with the security certification testing of the Foreign Affairs Information system (FAIS) Early Operational Capability (EOC) software. The basis for this certification is the FAIS (EOC) Security Requirements Allocation (SRA) document. This document defines the security requirements for the FAIS EOC software. Security certification of the FAIS system is the responsibility of the Office of Information Systems Security, Bureau of Diplomatic Security (DS/ST/ISS). The overall FAIS EOC certification will be completed in two general steps. First, a test of a stand-alone FAIS EOC system against the SRA requirements which is currently in progress. Second is a test of all FAIS network system interfaces against the SRA requirements as expanded to adequately address the network security issues. This accumulation of requirements is referred to as the FAIS EOC Network Security Criteria. 5 refs.

  6. Design, operation, and evaluation of the transportable vitrification system

    SciTech Connect (OSTI)

    Zamecnik, J.R.; Young, S.R.; Hansen, E.K.; Whitehouse, J.C.

    1997-02-20

    The Transportable Vitrification System (TVS) is a transportable melter system designed to demonstrate the treatment of low-level and mixed hazardous and radioactive wastes such as wastewater treatment sludges, contaminated soils and incinerator ash. The TVS is a large-scale, fully integrated vitrification system consisting of melter feed preparation, melter, offgas, service, and control modules. The TVS was tested with surrogate waste at the Clemson University Environmental Systems Engineering Department`s (ESED) DOE/Industry Center for Vitrification Research prior to being shipped to the DOE Oak Ridge Reservation (ORR) K-25 site for treatment of mixed waste. This testing, along with additional testing at ORR, proved that the TVS would be able to successfully treat mixed waste. These surrogate tests consistently produced glass that met the EPA Toxicity Characteristic Leaching Procedure (TCLP). Performance of the system resulted in acceptable emissions of regulated metals from the offgas system. The TVS is scheduled to begin mixed waste operations at ORR in June 1997.

  7. Model Predictive Control for the Operation of Building Cooling Systems

    SciTech Connect (OSTI)

    Ma, Yudong; Borrelli, Francesco; Hencey, Brandon; Coffey, Brian; Bengea, Sorin; Haves, Philip

    2010-06-29

    A model-based predictive control (MPC) is designed for optimal thermal energy storage in building cooling systems. We focus on buildings equipped with a water tank used for actively storing cold water produced by a series of chillers. Typically the chillers are operated at night to recharge the storage tank in order to meet the building demands on the following day. In this paper, we build on our previous work, improve the building load model, and present experimental results. The experiments show that MPC can achieve reduction in the central plant electricity cost and improvement of its efficiency.

  8. Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2

    SciTech Connect (OSTI)

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

  9. User interface for a tele-operated robotic hand system

    SciTech Connect (OSTI)

    Crawford, Anthony L

    2015-03-24

    Disclosed here is a user interface for a robotic hand. The user interface anchors a user's palm in a relatively stationary position and determines various angles of interest necessary for a user's finger to achieve a specific fingertip location. The user interface additionally conducts a calibration procedure to determine the user's applicable physiological dimensions. The user interface uses the applicable physiological dimensions and the specific fingertip location, and treats the user's finger as a two link three degree-of-freedom serial linkage in order to determine the angles of interest. The user interface communicates the angles of interest to a gripping-type end effector which closely mimics the range of motion and proportions of a human hand. The user interface requires minimal contact with the operator and provides distinct advantages in terms of available dexterity, work space flexibility, and adaptability to different users.

  10. Long-Term Operation Of Ground-Based Atmospheric Sensing Systems In The Tropical Western Pacific

    SciTech Connect (OSTI)

    Ivey, Mark; Jones, Larry J.; Porch, W. M.; Apple, Monty L.; Widener, Kevin B.

    2004-10-14

    Three semi-autonomous atmospheric sensing systems were installed in the tropical western Pacific region. The first of these Atmospheric Radiation and Cloud Stations (ARCS) began operation in 1996. Each ARCS is configured as a system-of-systems since it comprises an ensemble of independent instrument systems. The ARCS collect, process, and transmit large volumes of cloud, solar and thermal radiation, and meteorological data to support climate studies and climate-modeling improvements as part of the U.S Department of Energyís Atmospheric and Radiation Measurement (ARM) Program. Data from these tropical ARCS stations have been used for satellite ground-truth data comparisons and validations, including comparisons for MTI and AQUA satellite data. Our experiences with these systems in the tropics led to modifications in their design. An ongoing international logistics effort is required to keep gigabytes per day of quality-assured data flowing to the ARM programís archives. Design criteria, performance, communications methods, and the day-to-day logistics required to support long-term operations of ground-based remote atmospheric sensing systems are discussed. End-to-end data flow from the ARCS systems to the ARM Program archives is discussed.

  11. Hydraulically-activated operating system for an electric circuit breaker

    DOE Patents [OSTI]

    Imam, Imdad; Barkan, Philip

    1979-01-01

    This operating system comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit-breaker opening operation. A normally-closed valve located on the breaker-closing-side of the piston is openable to release liquid from the breaker-closing space so that pressurized liquid in the breaker-opening space can drive the piston in an opening direction. Means is provided for restoring the valve to its closed position following the circuit-breaker opening operation. An impeded passage affords communication between the accumulator and the breaker-closing space to allow pressurized liquid to flow from the accumulator to the breaker-closing space and develop a pressure therein substantially equal to accumulator pressure when the valve is restored to closed position following breaker-opening. This passage is so impeded that the flow therethrough from the accumulator into the breaker-closing space is sufficiently low during initial opening motion of the piston through a substantial portion of its opening stroke as to avoid interference with said initial opening motion of the piston.

  12. Incorporating Wind Generation Forecast Uncertainty into Power System Operation, Dispatch, and Unit Commitment Procedures

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Etingov, Pavel V.; Huang, Zhenyu; Ma, Jian; Subbarao, Krishnappa

    2010-10-19

    In this paper, an approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the "flying-brick" technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through integration with an EMS system illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems from other vendors.

  13. Control and operation cost optimization of the HISS cryogenic system

    SciTech Connect (OSTI)

    Porter, J.; Bieser, F.; Anderson, D.

    1983-08-01

    The Heavy Ion Spectrometer System (HISS) relies upon superconducting coils of cryostable design to provide a maximum particle bending field of 3 tesla. A previous paper describes the cryogenic facility including helium refrigeration and gas management. This paper discusses a control strategy which has allowed full time unattended operation, along with significant nitrogen and power cost reductions. Reduction of liquid nitrogen consumption has been accomplished by making use of the sensible heat available in the cold exhaust gas. Measured nitrogen throughput agrees with calculations for sensible heat utilization of zero to 70%. Calculated consumption saving over this range is 40 liters per hour for conductive losses to the supports only. The measured throughput differential for the total system is higher.

  14. Unattended mode operation of specialized NDA (nondestructive assay) systems

    SciTech Connect (OSTI)

    Klosterbuer, S.F.; Kern, E.A.; Painter, J.A.; Takahashi, S.

    1989-01-01

    Nondestructive assay systems have been developed to allow data acquisition equipment to operate unattended in an automated mixed oxide facility, reducing inspector time in a facility and giving them time for other activities. Fewer inspector visits mean less impact on plant operators. Neutron detectors are located at key measurement points in the facility. Near each detector is located an electronics cabinet, which contains two JSR-11 shift registers, two COMPAQ Portable III computers, and a printer. The signal from the detector is split and sent to each shift register for redundancy and reliability. The software for unattended operation consists primarily of two programs, COLLECT and REVIEW. The COLLECT program runs on the computers in unattended operation; shift-register data are acquired each 60 s. The COLLECT program distinguishes between a normal background and a disconnected signal, between material moving near the detector and material in the detector, and whether the material in the detector is a sample or a californium normalization source. Depending on the type of assay, different data are stored on the hard disk. During an inspection, the inspector stops the current measurement campaign, examines the data from both computers briefly at the electronics cabinet, copies the campaign data to floppy disk, and starts another measurement campaign. These data are examined later in another location using the REVIEW program running on high performance microcomputers: a COMPAQ DeskPro 386/20 or equivalent. The REVIEW program uses graphical displays to enable the inspector to quickly search through the massive amounts of accumulated data to learn when samples were measured. Data from the desired measurements are then transferred to the International Atomic Energy Agency high-level neutron coincidence program for further analysis. 3 refs., 7 figs.

  15. Operating experience feedback report: Service water system failures and degradations: Volume 3

    SciTech Connect (OSTI)

    Lam, P.; Leeds, E.

    1988-11-01

    A comprehensive review and evaluation of service water system failures and degradations observed in operating events in light water reactors from 1980 to 1987 has been conducted. The review and evaluation focused on the identification of causes of system failures and degradations, the adequacy of corrective actions implemented and planned, and the safety significance of the operating events. The results of this review and evaluation indicate that the service water system failures and degradations have significant safety implications. These system failures and degradations are attributable to a great variety of causes, and have adverse impact on a large number of safety-related systems and components which are required to mitigate reactor accidents. Specifically, the causes of failures and degradations include various fouling mechanisms (sediment deposition, biofouling, corrosion and erosion, pipe coating failure, calcium carbonate, foreign material and debris intrusion); single failures and other design deficiencies; flooding; multiple equipment failures; personnel and procedural errors; and seismic deficiencies. Systems and components adversely impacted by a service water system failure or degradation include the component cooling water system, emergency diesel generators, emergency core cooling system pumps and heat exchangers, the residual heat removal system, containment spray and fan coolers, control room chillers, and reactor building cooling units. 44 refs., 10 figs., 5 tabs.

  16. Operational and Regulatory Performance of Waste Crate Assay Systems at RFETS

    SciTech Connect (OSTI)

    Clapham, M. J.; Franco, J.; Simpson, A.; Santo, J.; Menlove, H. O.; Durel, F. M.

    2003-02-27

    As Rocky Flats Environmental Technology Site (RFETS) approaches its closure target of 2006 emphasis for Non-Destructive Assay (NDA) has shifted from small waste package assay systems towards larger systems that are designed to accommodate Standard Waste Boxes (SWB) and larger Low Level Waste (LLW) containers. To this end, Kaiser Hill, with the support of BNFL Instruments, Inc. (BII) and Los Alamos National Laboratory (LANL), has recently deployed two new crate assay systems. These systems provide the capacity to meet the assay requirements associated with the Deactivation and Decommissioning (D&D) at RFETS. The Super High Efficiency Neutron Coincidence Counting System (SuperHENC) was designed and fabricated as a collaborative effort between RFETS, LANL and BII. The purpose of this counter is to provide a WIPP certified assay capability for SWBs with a sensitivity that allows for TRU/LLW sorting. The SuperHENC has been in operation since early 2001. The BII Multi-Purpose Crate Counter (MPCC) is based on the Imaging Passive Active Neutron (IPAN) technology. This counter was designed to provide diverse capacity for WIPP certified assay of SWBs and to provide assay capability for larger LLW crates that are generated at RFETS. The MPCC has been in operation since early 2002. In order to meet the requirement for measurement of the WIPP tracked radionuclides, both systems incorporate a BII Gamma Energy Analysis sub-system. The unique Energy Times Attenuation (ETA) method is used to provide isotopic mass fractions for diverse waste streams. These systems were the first, and at this time the only, waste crate assay systems that have achieved WIPP certification. This represents a significant achievement given that the performance criteria applied to the measurements of large crates is identical to the criteria for 55-gallon (208 liter) drums. They are now both fully operational at RFETS and continue to successfully support the site closure mission.

  17. Smart Infrared Inspection System Field Operational Test Final Report

    SciTech Connect (OSTI)

    Siekmann, Adam; Capps, Gary J; Franzese, Oscar; Lascurain, Mary Beth

    2011-06-01

    The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

  18. Requirements for Computer Based-Procedures for Nuclear Power Plant Field Operators Results from a Qualitative Study

    SciTech Connect (OSTI)

    Katya Le Blanc; Johanna Oxstrand

    2012-05-01

    Although computer-based procedures (CBPs) have been investigated as a way to enhance operator performance on procedural tasks in the nuclear industry for almost thirty years, they are not currently widely deployed at United States utilities. One of the barriers to the wide scale deployment of CBPs is the lack of operational experience with CBPs that could serve as a sound basis for justifying the use of CBPs for nuclear utilities. Utilities are hesitant to adopt CBPs because of concern over potential costs of implementation, and concern over regulatory approval. Regulators require a sound technical basis for the use of any procedure at the utilities; without operating experience to support the use CBPs, it is difficult to establish such a technical basis. In an effort to begin the process of developing a technical basis for CBPs, researchers at Idaho National Laboratory are partnering with industry to explore CBPs with the objective of defining requirements for CBPs and developing an industry-wide vision and path forward for the use of CBPs. This paper describes the results from a qualitative study aimed at defining requirements for CBPs to be used by field operators and maintenance technicians.

  19. Rf System Requirements for JLabís MEIC Collider Ring

    SciTech Connect (OSTI)

    Wang, Shaoheng; Li, Rui; Rimmer, Robert A.; Wang, Haipeng; Zhang, Yuhong

    2013-06-01

    The Medium-energy Electron Ion Collider (MEIC), proposed by Jefferson Lab, consists of a series of accelerators. At the top energy are the electron and ion collider rings. For the ion ring, it accelerates five long ion bunches to colliding energy and rebunches ions into a train of very short bunches before colliding. A set of low frequency RF system is needed for the long ion bunch energy ramping. Another set of high frequency RF cavities is needed to rebunch ions. For the electron ring, superconducting RF (SRF) cavities are needed to compensate the synchrotron radiation energy loss. The impedance of the SRF cavities must be low enough to keep the high current electron beam stable. The preliminary design requirements of these RF cavities are presented.

  20. Integrated radwaste treatment system lessons learned from 2{1/2} years of operation

    SciTech Connect (OSTI)

    Baker, M.N.; Fussner, R.J.

    1997-05-01

    The Integrated Radwaste Treatment System (IRTS) at the West Valley Demonstration Project (WVDP) is a pretreatment scheme to reduce the amount of salts in the high-level radioactive waste (vitrification) stream. Following removal of cesium-137 (Cs-137) by ion-exchange in the Supernatant Treatment System (STS), the radioactive waste liquid is volume-reduced by evaporation. Trace amounts of Cs-137 in the resulting distillate are removed by ion-exchange, then the distillate is discharged to the existing plant water treatment system. The concentrated product, 37 to 41 percent solids by weight, is encapsulated in cement producing a stable, low-level waste form. The Integrated Radwaste Treatment System (IRTS) operated in this mode from May 1988 through November 1990, decontaminating 450,000 gallons of high-level waste liquid; evaporating and encapsulating the resulting concentrates into 10,393 71-gallon square drums. A number of process changes and variations from the original operating plan were required to increase the system flow rate and minimize waste volumes. This report provides a summary of work performed to operate the IRTS, including system descriptions, process highlights, and lessons learned.

  1. Incorporating Uncertainty of Wind Power Generation Forecast into Power System Operation, Dispatch, and Unit Commitment Procedures

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Etingov, Pavel V.; Ma, Jian; Huang, Zhenyu; Subbarao, Krishnappa

    2011-06-23

    An approach to evaluate the uncertainties of the balancing capacity, ramping capability, and ramp duration requirements is proposed. The approach includes three steps: forecast data acquisition, statistical analysis of retrospective information, and prediction of grid balancing requirements for a specified time horizon and a given confidence level. An assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on histogram analysis, incorporating sources of uncertainty - both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures). A new method called the 'flying-brick' technique is developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation process is used to validate the accuracy of the confidence intervals. To demonstrate the validity of the developed uncertainty assessment methods and its impact on grid operation, a framework for integrating the proposed methods with an EMS system is developed. Demonstration through EMS integration illustrates the applicability of the proposed methodology and the developed tool for actual grid operation and paves the road for integration with EMS systems in control rooms.

  2. Air Combat Command deicing/anti-icing operation: Compliance evaluation and requirements

    SciTech Connect (OSTI)

    Fronapfel, P.J.

    1997-12-31

    This paper will present information on Air Combat Command`s (ACC) efforts in evaluating its deicing and anti-icing activities at all applicable ACC bases. This effort, led by Ecology and Environment (E and E), of Lancaster NY, will evaluate the operations, infrastructure, and management of deicing and anti-icing programs at ACC bases and will provide recommendations to each base for maintaining compliance with applicable regulations and minimizing the environmental impact of these operations. In addition to evaluating such operations at ACC bases, E and E, along with subcontractor Jacobs Engineering Group, Inc., will research activities around the nation and the world to assist in developing the best recommendations for each ACC base. Armstrong Laboratory`s Water Quality Branch of the Bioenvironmental Engineering Division (AL/OEBW) is responsible for technical and contractual oversight of this effort. A summary of information gathered to date will be presented in this paper. Although the disposal of deicing fluids has led a somewhat charmed life until recently, these activities are likely to receive increased regulatory scrutiny in the years to come. Air Combat Command has had more than one instance where NOVs or potential NOVs have arisen due to fish kills associated with deicing/anti-icing chemical laden runoff. In an effort to prevent future compliance problems and to foster proper stewardship of the environment, ACC has taken these proactive measures at its bases. ACC`s efforts will also be used at the Air Staff level to assist in making Air Force wide pollution prevention and best management practice (P2/BMP) recommendations.

  3. Method for operating a combustor in a fuel cell system

    DOE Patents [OSTI]

    Chalfant, Robert W.; Clingerman, Bruce J.

    2002-01-01

    A method of operating a combustor to heat a fuel processor in a fuel cell system, in which the fuel processor generates a hydrogen-rich stream a portion of which is consumed in a fuel cell stack and a portion of which is discharged from the fuel cell stack and supplied to the combustor, and wherein first and second streams are supplied to the combustor, the first stream being a hydrocarbon fuel stream and the second stream consisting of said hydrogen-rich stream, the method comprising the steps of monitoring the temperature of the fuel processor; regulating the quantity of the first stream to the combustor according to the temperature of the fuel processor; and comparing said quantity of said first stream to a predetermined value or range of predetermined values.

  4. Underground coal operators install several new longwall mining systems

    SciTech Connect (OSTI)

    Fiscor, S.

    2008-02-15

    Several new names appear in the annual US Longwall Census, but the population remains the same: 52 although the number of longwall mines dropped from 40 to 47. CONSOL Energy remains the leader with 12 faces. Robert E. Murray owns 8 longwall mines followed by Arch Coal with 5 and Foundation Coal with 3. West Virginia has 13 longwalls followed by 9 in Pennsylvania, 7 in Utah and 6 in Alabama. The article describes CONSOL Energy's operations. A detailed table gives for each longwall installation, the ownership, seam height, cutting height, panel width and length, overburden, number of gate entries, depth of cut, model of equipment used (shearer, haulage system, roof support, face conveyor, stage loader, crusher, electrical controls and voltage to face). 2 tabs.

  5. Method and system for operating an electric motor

    DOE Patents [OSTI]

    Gallegos-Lopez, Gabriel; Hiti, Silva; Perisic, Milun

    2013-01-22

    Methods and systems for operating an electric motor having a plurality of windings with an inverter having a plurality of switches coupled to a voltage source are provided. A first plurality of switching vectors is applied to the plurality of switches. The first plurality of switching vectors includes a first ratio of first magnitude switching vectors to second magnitude switching vectors. A direct current (DC) current associated with the voltage source is monitored during the applying of the first plurality of switching vectors to the plurality of switches. A second ratio of the first magnitude switching vectors to the second magnitude switching vectors is selected based on the monitoring of the DC current associated with the voltage source. A second plurality of switching vectors is applied to the plurality of switches. The second plurality of switching vectors includes the second ratio of the first magnitude switching vectors to the second magnitude switching vectors.

  6. Review of the IEEE Standard for Computerized Operating Procedure Systems

    SciTech Connect (OSTI)

    O'Hara, J.; Higgins, J.

    2010-02-26

    Increasingly nuclear power plant procedures, such as emergency operating procedures, are being presented in computer form with functionality to support operator use and management of the procedures. The U.S. Nuclear Regulatory Commission (NRC) currently has guidance for the review of computer-based procedures (CBPs); however, there remain CBP functions and human performance issues for which up-to-date guidance is lacking. The Institute of Electrical and Electronics Engineers (IEEE) has initiated a standard development effort to address the human factors engineering (HFE) aspects of CBP systems. When completed, it may provide guidance to supplement the NRC staff's review criteria. The purpose of our study was to evaluate the suitability of the IEEE Standard for use in the NRC's HFE safety reviews of CBP systems and to ensure that the guidance meets the NRC's standard for scientific and engineering rigor used in its own guidance development efforts. We established the following criteria with which to evaluate the Standard: (1) it should meet an existing need of NRC reviewers, (2) it should be based in sound HFE principles, (3) it should be thoroughly peer-reviewed, and (4) it should address CBP-related human performance issues identified in the literature. This report describes the methodology we used to evaluate each criterion. Our evaluation concluded that the Standard generally does meet these criteria, however several areas were identified for which additional clarifications are needed. Thus consideration of the Standard's use by the NRC is supported. The standard evaluation methodology developed in this study can be generally applied to the review of other HFE standards being considered for possible use or endorsement by the NRC.

  7. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  8. Method and system for determining the torque required to launch a vehicle having a hybrid drive-train

    DOE Patents [OSTI]

    Hughes, Douglas A.

    2006-04-04

    A method and system are provided for determining the torque required to launch a vehicle having a hybrid drive-train that includes at least two independently operable prime movers. The method includes the steps of determining the value of at least one control parameter indicative of a vehicle operating condition, determining the torque required to launch the vehicle from the at least one determined control parameter, comparing the torque available from the prime movers to the torque required to launch the vehicle, and controlling operation of the prime movers to launch the vehicle in response to the comparing step. The system of the present invention includes a control unit configured to perform the steps of the method outlined above.

  9. AMI System Security Requirements - v1_01-1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AMI System Security Requirements - v1_01-1 AMI System Security Requirements - v1_01-1 This document provides the utility industry and vendors with a set of security requirements for Advanced Metering Infrastructure (AMI). These requirements are intended to be used in the procurement process, and represent a superset of requirements gathered from current cross industry accepted security standards and best practice guidance documents. AMI System Security Requirements - v1_01-1 (825.11 KB) More

  10. Fuel cell systems for passenger cars - opportunities and requirements

    SciTech Connect (OSTI)

    Tachtler, J.; Bourne, C.

    1996-12-31

    From the point of view of energy density, handling and economy, present-day motor fuels are superior to all known alternatives. The internal combustion engine powered by them satisfies the requirements of customers to an excellent degree. The search for alternatives can therefore only be justified if emissions can be avoided totally and non-fossil primary energy sources can be used or at least partially our dependence on mineral oil can be reduced. What was long suspected has been increasingly confirmed, not least by developments at BMW: electricity (stored in batteries) and hydrogen offer the best prerequisites for achieving these goals in the long term. These forms of energy can be produced in sufficient quantities and with relatively little effect on the environment. They promise to produce an absolute minimum of pollutants when used in vehicles. Natural gas, which is very similar to hydrogen, and hybrid systems, that would compensate for battery risks, could perform a valuable function in the transitional phase.

  11. Chemical Safety Management Program for Lockheed Martin Energy Systems operations at the Y-12 Plant

    SciTech Connect (OSTI)

    C.W. McMahon

    2000-03-24

    Operated by Lockheed Martin Energy Systems (Energy Systems), the Department of Energy (DOE) Oak Ridge Y-12 Plant is a manufacturing facility that plays an integral role in the DOE nuclear weapons complex. Fulfilling the national security mission at the Y-12 Plant, continuing to be the cornerstone of uranium and lithium technologies for DOE, and providing customers with solutions for challenging manufacturing needs requires usage of a variety of chemicals and chemical processes. Performing this work safely while protecting workers, the public, and the environment is their commitment. The purpose of this document is to provide a description of the essential components of chemical safety, the integration of these components into the Y-12 Integrated Safety Management System (ISMS), and the functional integration of chemical safety issues across Y-12 organizations and programs managed by Energy Systems.

  12. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  13. Human Factors and Technical Considerations for a Computerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ulrich, Thomas Anthony; Lew, Roger Thomas; Medema, Heather Dawne; Boring, Ronald Laurids; Thomas, Kenneth David

    2015-09-01

    A prototype computerized operator support system (COSS) has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment. A COSS demonstration scenario has been developed for the prototype involving the Chemical & Volume Control System (CVCS) of the PWR simulator. It involves a primary coolant leak outside of containment that would require tripping the reactor if not mitigated in a very short timeframe. The COSS prototype presents a series of operator screens that provide the needed information and soft controls to successfully mitigate the event.

  14. Cyber Security Requirements for Wireless Devices and Information Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-11

    The Notice establishes DOE policy requirements and responsibilities for using wireless networks and devices within DOE and implements the requirements of DOE 0 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, including requirements for cyber resource protection, risk management, program evaluation, and cyber security plan development and maintenance. No cancellation. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  15. Energy.gov Content Management System Requirements and Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    Page types Block types Linking File naming conventions Optimizing native files Data tables Webforms To check whether an Energy.gov page meets EERE's requirements, use the ...

  16. Laboratory evaluation of dynamic traffic assignment systems: Requirements, framework, and system design

    SciTech Connect (OSTI)

    Miaou, S.-P.; Pillai, R.S.; Summers, M.S.; Rathi, A.K.; Lieu, H.C.

    1997-01-01

    The success of Advanced Traveler Information 5ystems (ATIS) and Advanced Traffic Management Systems (ATMS) depends on the availability and dissemination of timely and accurate estimates of current and emerging traffic network conditions. Real-time Dynamic Traffic Assignment (DTA) systems are being developed to provide the required timely information. The DTA systems will provide faithful and coherent real-time, pre-trip, and en-route guidance/information which includes routing, mode, and departure time suggestions for use by travelers, ATIS, and ATMS. To ensure the credibility and deployment potential of such DTA systems, an evaluation system supporting all phases of DTA system development has been designed and presented in this paper. This evaluation system is called the DTA System Laboratory (DSL). A major component of the DSL is a ground- truth simulator, the DTA Evaluation System (DES). The DES is envisioned to be a virtual representation of a transportation system in which ATMS and ATIS technologies are deployed. It simulates the driving and decision-making behavior of travelers in response to ATIS and ATMS guidance, information, and control. This paper presents the major evaluation requirements for a DTA Systems, a modular modeling framework for the DES, and a distributed DES design. The modeling framework for the DES is modular, meets the requirements, can be assembled using both legacy and independently developed modules, and can be implemented as a either a single process or a distributed system. The distributed design is extendible, provides for the optimization of distributed performance, and object-oriented design within each distributed component. A status report on the development of the DES and other research applications is also provided.

  17. Hydraulically-actuated operating system for an electric circuit breaker

    DOE Patents [OSTI]

    Barkan, Philip; Imam, Imdad

    1978-01-01

    This hydraulically-actuated operating system comprises a cylinder, a piston movable therein in an opening direction to open a circuit breaker, and an accumulator for supplying pressurized liquid to a piston-actuating space within the cylinder. A normally-closed valve between the accumulator and the actuating space is openable to allow pressurized liquid from the accumulator to flow through the valve into the actuating space to drive the piston in an opening direction. A vent is located hydraulically between the actuating space and the valve for affording communication between said actuating space and a low pressure region. Flow control means is provided for restricting leakage through said vent to a rate that prevents said leakage from substantially detracting from the development of pressure within said actuatng space during the period from initial opening of the valve to the time when said piston has moved through most of its opening stroke. Following such period and while the valve is still open, said flow control means allows effective leakage through said vent. The accumulator has a limited capacity that results in the pressure within said actuating space decaying promptly to a low value as a result of effective leakage through said vent after the piston has moved through a circuit-breaker opening stroke and while the valve is in its open state. Means is provided for resetting the valve to its closed state in response to said pressure decay in the actuating space.

  18. Pressurized reactor system and a method of operating the same

    DOE Patents [OSTI]

    Isaksson, Juhani M. (Karhula, FI)

    1996-01-01

    A method and apparatus are provided for operating a pressurized reactor system in order to precisely control the temperature within a pressure vessel in order to minimize condensation of corrosive materials from gases on the surfaces of the pressure vessel or contained circulating fluidized bed reactor, and to prevent the temperature of the components from reaching a detrimentally high level, while at the same time allowing quick heating of the pressure vessel interior volume during start-up. Superatmospheric pressure gas is introduced from the first conduit into the fluidized bed reactor and heat derived reactions such as combustion and gassification are maintained in the reactor. Gas is exhausted from the reactor and pressure vessel through a second conduit. Gas is circulated from one part of the inside volume to another to control the temperature of the inside volume, such as by passing the gas through an exterior conduit which has a heat exchanger, control valve, blower and compressor associated therewith, or by causing natural convection flow of circulating gas within one or more generally vertically extending gas passages entirely within the pressure vessel (and containing heat exchangers, flow rate control valves, or the like therein). Preferably, inert gas is provided as a circulating gas, and the inert gas may also be used in emergency shut-down situations. In emergency shut-down reaction gas being supplied to the reactor is cut off, while inert gas from the interior gas volume of the pressure vessel is introduced into the reactor.

  19. Pressurized reactor system and a method of operating the same

    DOE Patents [OSTI]

    Isaksson, J.M.

    1996-06-18

    A method and apparatus are provided for operating a pressurized reactor system in order to precisely control the temperature within a pressure vessel in order to minimize condensation of corrosive materials from gases on the surfaces of the pressure vessel or contained circulating fluidized bed reactor, and to prevent the temperature of the components from reaching a detrimentally high level, while at the same time allowing quick heating of the pressure vessel interior volume during start-up. Super-atmospheric pressure gas is introduced from the first conduit into the fluidized bed reactor and heat derived reactions such as combustion and gasification are maintained in the reactor. Gas is exhausted from the reactor and pressure vessel through a second conduit. Gas is circulated from one part of the inside volume to another to control the temperature of the inside volume, such as by passing the gas through an exterior conduit which has a heat exchanger, control valve, blower and compressor associated therewith, or by causing natural convection flow of circulating gas within one or more generally vertically extending gas passages entirely within the pressure vessel (and containing heat exchangers, flow rate control valves, or the like therein). Preferably, inert gas is provided as a circulating gas, and the inert gas may also be used in emergency shut-down situations. In emergency shut-down reaction gas being supplied to the reactor is cut off, while inert gas from the interior gas volume of the pressure vessel is introduced into the reactor. 2 figs.

  20. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).

    SciTech Connect (OSTI)

    Columbia River System Operation Review

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

  1. Systems acceptance and operability testing for rotary mode core sampling in flammable gas tanks

    SciTech Connect (OSTI)

    Corbett, J.E., Westinghouse Hanford

    1996-07-29

    This document provides instructions for the system acceptance and operability testing of the rotary mode core sampling system, modified for use in flammable gas tanks.

  2. Systems and methods for controlling an operating wavelength

    DOE Patents [OSTI]

    Cox, Jonathan Albert; Lentine, Anthony L.

    2015-09-08

    The resonant frequency of an optical micro-resonator may be controlled by "locking" an operating frequency/wavelength of the resonator using CMOS compatible electronic components.

  3. Driving Operational Changes Through an Energy Monitoring System

    Broader source: Energy.gov [DOE]

    Fact sheet describes a case study of IBM's corporate energy efficiency monitoring program that focuses on basic improvements in its real estate operations.

  4. Georgia System Operations Corporation Inc. Smart Grid Project...

    Open Energy Info (EERE)

    Power Quality Optimized Generator Operation Reduced Ancillary Service Cost Reduced Electricity Costs for Customers Reduced Greenhouse Gas and Criteria Pollutant Emissions Reduced...

  5. Vermont Construction and Operation of Net Metering Systems Rules...

    Open Energy Info (EERE)

    rule is applicable to all net metered installations in Vermont, and applies to every person, firm, company, corporation and municipality engaged in the construction or operation...

  6. Vermont Construction and Operation of Net Metering Systems Rule...

    Open Energy Info (EERE)

    rule is applicable to all net metered installations in Vermont, and applies to every person, firm, company, corporation and municipality engaged in the construction or operation...

  7. Beyond climate-smart agriculture: toward safe operating spaces for global food systems

    SciTech Connect (OSTI)

    Gulledge, Jay; Neufeldt, Heinrich; Jahn, Margaret M; Lezaks, David P; Meinke, Jan H; Scholes, Robert J

    2013-01-01

    Agriculture is considered to be climate-smart when it contributes to increasing food security, adaptation and mitigation in a sustainable way. This new concept now dominates current discussions in agricultural development because of its capacity to unite the agendas of the agriculture, development and climate change communities under one brand. In this opinion piece authored by scientists from a variety of international agricultural and climate research communities, we argue that the concept needs to be evaluated critically because the relationship between the three dimensions is poorly understood, such that practically any improved agricultural practice can be considered climate-smart. This lack of clarity may have contributed to the broad appeal of the concept. From the understanding that we must hold ourselves accountable to demonstrably better meet human needs in the short and long term within foreseeable local and planetary limits, we develop a conceptualization of climate-smart agriculture as agriculture that can be shown to bring us closer to safe operating spaces for agricultural and food systems across spatial and temporal scales. Improvements in the management of agricultural systems that bring us significantly closer to safe operating spaces will require transformations in governance and use of our natural resources, underpinned by enabling political, social and economic conditions beyond incremental changes. Establishing scientifically credible indicators and metrics of long-term safe operating spaces in the context of a changing climate and growing social-ecological challenges is critical to creating the societal demand and political will required to motivate deep transformations. Answering questions on how the needed transformational change can be achieved will require actively setting and testing hypotheses to refine and characterize our concepts of safer spaces for social-ecological systems across scales. This effort will demand prioritizing key

  8. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    SciTech Connect (OSTI)

    Reddoch, T.W.; Markel, L.C.

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  9. System requirements specification for a Solar Central Receiver System integrated with a cogeneration facility

    SciTech Connect (OSTI)

    Not Available

    1981-02-24

    The characteristics, design and environmental requirements, and economic data are defined for a Solar Central Receiver System Integrated with a Cogeneration Facility for Copper Smelting. The added solar capacity will supply process heat to an existing copper smelting flash furnace of Finnish design as well as providing for the cogeneration of electricity by an added gas turbine system. Heat storage to accommodate periods of low solar insolation is accomplished by the innovative utilization of copper slag in a thermal energy storage system. The proposed modifications and existing site conditions and facilities are described. Applicable standards and codes, publications, reference documentation, and regulatory information are listed. Design and performance requirements to be met by this solar cogeneration facility are outlined, and the environmental criteria applicable to the plant are addressed. The solar cogeneration facility's characteristics and performance data are specified, along with the plant cost and economic data. Simulation models are also described.

  10. Detailed design report for an operational phase panel-closure system

    SciTech Connect (OSTI)

    1996-01-11

    Under contract to Westinghouse Electric Corporation (Westinghouse), Waste Isolation Division (WID), IT Corporation has prepared a detailed design of a panel-closure system for the Waste Isolation Pilot Plant (WIPP). Preparation of this detailed design of an operational-phase closure system is required to support a Resource Conservation and Recovery Act (RCRA) Part B permit application and a non-migration variance petition. This report describes the detailed design for a panel-closure system specific to the WIPP site. The recommended panel-closure system will adequately isolate the waste-emplacement panels for at least 35 years. This report provides detailed design and material engineering specifications for the construction, emplacement, and interface-grouting associated with a panel-closure system at the WIPP repository, which would ensure that an effective panel-closure system is in place for at least 35 years. The panel-closure system provides assurance that the limit for the migration of volatile organic compounds (VOC) will be met at the point of compliance, the WIPP site boundary. This assurance is obtained through the inherent flexibility of the panel-closure system.

  11. Operating experience review of an INL gas monitoring system

    SciTech Connect (OSTI)

    Cadwallader, Lee C.; DeWall, K. G.; Herring, J. S.

    2015-03-12

    This article describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored in the lab room are hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and both actual and unwanted alarms are described. The calibration session time durations are described. In addition, some simple calculations are given to estimate the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

  12. Operating experience review of an INL gas monitoring system

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Cadwallader, Lee C.; DeWall, K. G.; Herring, J. S.

    2015-03-01

    This article describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored in the lab room are hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and both actual and unwanted alarms are described. The calibration session time durations are described. Some simple calculations are given to estimate the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

  13. System and method of operating toroidal magnetic confinement devices

    DOE Patents [OSTI]

    Chance, M.S.; Jardin, S.C.; Stix, T.H.; Grimm, R.C.; Manickam, J.; Okabayashi, M.

    1984-08-30

    This invention pertains to methods and arrangements for attaining high beta values in plasma confinement devices. More specifically, this invention pertains to methods for accessing the second stability region of operation in toroidal magnetic confinement devices.

  14. A Flexible Power System Operations Simulation Model for Assessing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... common method of forecasting in the very short-term. Many of the integration studies in 1 determine that the forecast errors have larger impacts on costs and operations than ...

  15. Unmanned Aerial Vehicle (UAV) Dynamic-Tracking Directional Wireless Antennas for Low Powered Applications that Require Reliable Extended Range Operations in Time Critical Scenarios

    SciTech Connect (OSTI)

    Scott G. Bauer; Matthew O. Anderson; James R. Hanneman

    2005-10-01

    The proven value of DOD Unmanned Aerial Vehicles (UAVs) will ultimately transition to National and Homeland Security missions that require real-time aerial surveillance, situation awareness, force protection, and sensor placement. Public services first responders who routinely risk personal safety to assess and report a situation for emergency actions will likely be the first to benefit from these new unmanned technologies. ‚ÄėPackable‚Äô or ‚ÄėPortable‚Äô small class UAVs will be particularly useful to the first responder. They require the least amount of training, no fixed infrastructure, and are capable of being launched and recovered from the point of emergency. All UAVs require wireless communication technologies for real- time applications. Typically on a small UAV, a low bandwidth telemetry link is required for command and control (C2), and systems health monitoring. If the UAV is equipped with a real-time Electro-Optical or Infrared (EO/Ir) video camera payload, a dedicated high bandwidth analog/digital link is usually required for reliable high-resolution imagery. In most cases, both the wireless telemetry and real-time video links will be integrated into the UAV with unity gain omni-directional antennas. With limited on-board power and payload capacity, a small UAV will be limited with the amount of radio-frequency (RF) energy it transmits to the users. Therefore, ‚Äėpackable‚Äô and ‚Äėportable‚Äô UAVs will have limited useful operational ranges for first responders. This paper will discuss the limitations of small UAV wireless communications. The discussion will present an approach of utilizing a dynamic ground based real-time tracking high gain directional antenna to provide extend range stand-off operation, potential RF channel reuse, and assured telemetry and data communications from low-powered UAV deployed wireless assets.

  16. Mark R. Hahn of the Richland Operations Office presented 2014 Safety System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oversight Annual Award | Department of Energy Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award May 21, 2015 - 1:18pm Addthis Mark R. Hahn of the Richland Operations Office presented 2014 Safety System Oversight Annual Award About 70 Department of Energy (DOE) federal employees serve as Safety System Oversight (SSO) personnel, providing federal

  17. Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid

    SciTech Connect (OSTI)

    Tian; Tian; Chernyakhovskiy, Ilya

    2016-01-01

    This document discusses improving system operations with forecasting and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

  18. Wind-To-Hydrogen Project: Operational Experience, Performance Testing, and Systems Integration

    SciTech Connect (OSTI)

    Harrison, K. W.; Martin, G. D.; Ramsden, T. G.; Kramer, W. E.; Novachek, F. J.

    2009-03-01

    The Wind2H2 system is fully functional and continues to gather performance data. In this report, specifications of the Wind2H2 equipment (electrolyzers, compressor, hydrogen storage tanks, and the hydrogen fueled generator) are summarized. System operational experience and lessons learned are discussed. Valuable operational experience is shared through running, testing, daily operations, and troubleshooting the Wind2H2 system and equipment errors are being logged to help evaluate the reliability of the system.

  19. System and method of vehicle operating condition management

    DOE Patents [OSTI]

    Sujan, Vivek A.; Vajapeyazula, Phani; Follen, Kenneth; Wu, An; Moffett, Barty L.

    2015-10-20

    A vehicle operating condition profile can be determined over a given route while also considering imposed constraints such as deviation from time targets, deviation from maximum governed speed limits, etc. Given current vehicle speed, engine state and transmission state, the present disclosure optimally manages the engine map and transmission to provide a recommended vehicle operating condition that optimizes fuel consumption in transitioning from one vehicle state to a target state. Exemplary embodiments provide for offline and online optimizations relative to fuel consumption. The benefit is increased freight efficiency in transporting cargo from source to destination by minimizing fuel consumption and maintaining drivability.

  20. System and method of operating toroidal magnetic confinement devices

    DOE Patents [OSTI]

    Chance, Morrell S.; Jardin, Stephen C.; Stix, Thomas H.; Grimm, deceased, Ray C.; Manickam, Janardhan; Okabayashi, Michio

    1987-01-01

    For toroidal magnetic confinement devices the second region of stability against ballooning modes can be accessed with controlled operation. Under certain modes of operation, the first and second stability regions may be joined together. Accessing the second region of stability is accomplished by forming a bean-shaped plasma and increasing the indentation until a critical value of indentation is reached. A pusher coil, located at the inner-major-radius side of the device, is engaged to form a bean-shaped poloidal cross-section in the plasma.

  1. Control system for, and a method of, heating an operator station of a work machine

    DOE Patents [OSTI]

    Baker, Thomas M.; Hoff, Brian D.; Akasam, Sivaprasad

    2005-04-05

    There are situations in which an operator remains in an operator station of a work machine when an engine of the work machine is inactive. The present invention includes a control system for, and a method of, heating the operator station when the engine is inactive. A heating system of the work machine includes an electrically-powered coolant pump, a power source, and at least one piece of warmed machinery. An operator heat controller is moveable between a first and a second position, and is operable to connect the electrically-powered coolant pump to the power source when the engine is inactive and the operator heat controller is in the first position. Thus, by deactivating the engine and then moving the operator heat controller to the first position, the operator may supply electrical energy to the electrically-powered coolant pump, which is operably coupled to heat the operator station.

  2. Security Requirements for Classified Automatic Data Processing Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1985-07-10

    To establish and describe the computer security program for classified automatic data processing (ADP) systems at the Department of Energy (DOE) Headquarters. This directive does not cancel another directive. Canceled by DOE N 251.9.

  3. Framework for Adaptable Operating and Runtime Systems: Final Project Report

    SciTech Connect (OSTI)

    Patrick G. Bridges

    2012-02-01

    In this grant, we examined a wide range of techniques for constructing high-performance con#12;gurable system software for HPC systems and its application to DOE-relevant problems. Overall, research and development on this project focused in three specifc areas: (1) software frameworks for constructing and deploying con#12;gurable system software, (2) applcation of these frameworks to HPC-oriented adaptable networking software, (3) performance analysis of HPC system software to understand opportunities for performance optimization.

  4. Preliminary Concept of Operations for a Global Cylinder Identification and Monitoring System

    SciTech Connect (OSTI)

    Whitaker, J. M.; White-Horton, J. L.; Morgan, J. B.

    2013-08-01

    This report describes a preliminary concept of operations for a Global Cylinder Identification and Monitoring System that could improve the efficiency of the International Atomic Energy Agency (IAEA) in conducting its current inspection activities and could provide a capability to substantially increase its ability to detect credible diversion scenarios and undeclared production pathways involving UF6 cylinders. There exist concerns that a proliferant State with access to enrichment technology could obtain a cylinder containing natural or low-enriched uranium hexafluoride (UF6) and produce a significant quantity (SQ)1 of highly enriched uranium in as little as 30 days. The National Nuclear Security Administration (NNSA) through the Next Generation Safeguards Initiative sponsored a multi-laboratory team to develop an integrated system that provides for detecting scenarios involving 1) diverting an entire declared cylinder for enrichment at a clandestine facility, 2) misusing a declared cylinder at a safeguarded facility, and 3) using an undeclared cylinder at a safeguarded facility. An important objective in developing this integrated system was to improve the timeliness for detecting the cylinder diversion and undeclared production scenarios. Developing this preliminary concept required in-depth analyses of current operational and safeguards practices at conversion, enrichment, and fuel fabrication facilities. The analyses evaluated the processing, movement, and storage of cylinders at the facilities; the movement of cylinders between facilities (including cylinder fabrication); and the misuse of safeguarded facilities.

  5. Performance evaluation of radiant cooling system integrated with air system under different operational strategies

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Khan, Yasin; Khare, Vaibhav Rai; Mathur, Jyotirmay; Bhandari, Mahabir

    2015-03-26

    The paper describes a parametric study developed to estimate the energy savings potential of a radiant cooling system installed in a commercial building in India. The study is based on numerical modeling of a radiant cooling system installed in an Information Technology (IT) office building sited in the composite climate of Hyderabad. To evaluate thermal performance and energy consumption, simulations were carried out using the ANSYS FLUENT and EnergyPlus softwares, respectively. The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption of a building usingmore¬†¬Ľ a conventional all-air system to determine the proportional energy savings. For proper handling of the latent load, a dedicated outside air system (DOAS) was used as an alternative to Fan Coil Unit (FCU). A comparison of energy consumption calculated that the radiant system was 17.5 % more efficient than a conventional all-air system and that a 30% savings was achieved by using a DOAS system compared with a conventional system. Computational Fluid Dynamics (CFD) simulation was performed to evaluate indoor air quality and thermal comfort. It was found that a radiant system offers more uniform temperatures, as well as a better mean air temperature range, than a conventional system. To further enhance the energy savings in the radiant system, different operational strategies were analyzed based on thermal analysis using EnergyPlus. Lastly, the energy savings achieved in this parametric run were more than 10% compared with a conventional all-air system.¬ę¬†less

  6. Performance evaluation of radiant cooling system integrated with air system under different operational strategies

    SciTech Connect (OSTI)

    Khan, Yasin; Khare, Vaibhav Rai; Mathur, Jyotirmay; Bhandari, Mahabir

    2015-03-26

    The paper describes a parametric study developed to estimate the energy savings potential of a radiant cooling system installed in a commercial building in India. The study is based on numerical modeling of a radiant cooling system installed in an Information Technology (IT) office building sited in the composite climate of Hyderabad. To evaluate thermal performance and energy consumption, simulations were carried out using the ANSYS FLUENT and EnergyPlus softwares, respectively. The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption of a building using a conventional all-air system to determine the proportional energy savings. For proper handling of the latent load, a dedicated outside air system (DOAS) was used as an alternative to Fan Coil Unit (FCU). A comparison of energy consumption calculated that the radiant system was 17.5 % more efficient than a conventional all-air system and that a 30% savings was achieved by using a DOAS system compared with a conventional system. Computational Fluid Dynamics (CFD) simulation was performed to evaluate indoor air quality and thermal comfort. It was found that a radiant system offers more uniform temperatures, as well as a better mean air temperature range, than a conventional system. To further enhance the energy savings in the radiant system, different operational strategies were analyzed based on thermal analysis using EnergyPlus. Lastly, the energy savings achieved in this parametric run were more than 10% compared with a conventional all-air system.

  7. Performance evaluation of radiant cooling system integrated with air system under different operational strategies

    SciTech Connect (OSTI)

    Khan, Yasin; Khare, Vaibhav Rai; Mathur, Jyotirmay; Bhandari, Mahabir

    2015-06-01

    The paper describes a parametric study developed to estimate the energy savings potential of a radiant cooling system installed in a commercial building in India. The study is based on numerical modeling of a radiant cooling system installed in an Information Technology (IT) office building sited in the composite climate of Hyderabad. To evaluate thermal performance and energy consumption, simulations were carried out using the ANSYS FLUENT and EnergyPlus softwares, respectively. The building model was calibrated using the measured data for the installed radiant system. Then this calibrated model was used to simulate the energy consumption of a building using a conventional all-air system to determine the proportional energy savings. For proper handling of the latent load, a dedicated outside air system (DOAS) was used as an alternative to Fan Coil Unit (FCU). A comparison of energy consumption calculated that the radiant system was 17.5 % more efficient than a conventional all-air system and that a 30% savings was achieved by using a DOAS system compared with a conventional system. Computational Fluid Dynamics (CFD) simulation was performed to evaluate indoor air quality and thermal comfort. It was found that a radiant system offers more uniform temperatures, as well as a better mean air temperature range, than a conventional system. To further enhance the energy savings in the radiant system, different operational strategies were analyzed based on thermal analysis using EnergyPlus. The energy savings achieved in this parametric run were more than 10% compared with a conventional all-air system.

  8. GTRI Remote Monitoring System: Training and Operational Needs Assessment Analysis Report

    SciTech Connect (OSTI)

    Day, Debra E.; Fox, Sorcha

    2012-04-20

    The mission of the United States Department of Energy (DOE) National Nuclear Security Administrations (NNSA's) Global Threat Reduction Initiative (GTRI) is to identify, secure, recover and facilitate the disposition of vulnerable nuclear and high-risk radioactive materials around the world that pose a threat to the United States and the international community. The GTRI's unique mission to reduce and protect vulnerable nuclear and radiological materials located at civilian sites worldwide directly addresses recommendations of the 9/11 Commission1, and is a vital part of the President's National Security Strategy and the Global Initiative. The GTRI Remote Monitoring System (RMS) is a standalone security system that includes radiation and tamper alarms, and CCTV; which can be transmitted securely over the Internet to multiple on-site and off-site locations. Through our experiences during installation of the system at 162 sites, plus feedback received from Alarm Response Training course participants, site input to project teams and analysis of trouble calls; indications were that current system training was lacking and inconsistent. A survey was undertaken to gather information from RMS users across the nation, to evaluate the current level of training and determine what if any improvements needed to be made. Additional questions were focused on the operation of the RMS software. The training survey was initially sent electronically to 245 users at the RMS sites and achieved a 37.6% return rate. Analysis of the resulting data revealed that 34.6% of the respondents had not received training or were unsure if they had, despite the fact that vendor engineers provide training at installation of the system. Any training received was referred to as minimal, and brief, not documented, and nothing in writing. 63.7% of respondents said they were either not at all prepared or only somewhat prepared to use the RMS software required to effectively operate the system. As a result

  9. Methods for operating parallel computing systems employing sequenced communications

    DOE Patents [OSTI]

    Benner, R.E.; Gustafson, J.L.; Montry, G.R.

    1999-08-10

    A parallel computing system and method are disclosed having improved performance where a program is concurrently run on a plurality of nodes for reducing total processing time, each node having a processor, a memory, and a predetermined number of communication channels connected to the node and independently connected directly to other nodes. The present invention improves performance of the parallel computing system by providing a system which can provide efficient communication between the processors and between the system and input and output devices. A method is also disclosed which can locate defective nodes with the computing system. 15 figs.

  10. Methods for operating parallel computing systems employing sequenced communications

    DOE Patents [OSTI]

    Benner, Robert E.; Gustafson, John L.; Montry, Gary R.

    1999-01-01

    A parallel computing system and method having improved performance where a program is concurrently run on a plurality of nodes for reducing total processing time, each node having a processor, a memory, and a predetermined number of communication channels connected to the node and independently connected directly to other nodes. The present invention improves performance of performance of the parallel computing system by providing a system which can provide efficient communication between the processors and between the system and input and output devices. A method is also disclosed which can locate defective nodes with the computing system.