  1. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM Transmittal Letter and Attachment Final.pdf (406.93 KB) More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  2. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM Transmittal Letter and Attachment Final.pdf (541.36 KB) More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  3. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM ...

  4. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM ...

  5. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  6. Requirements Based Surveillance and Maintenance Review Process...

    Energy Savers [EERE]

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  7. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  8. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  9. SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance

    Office of Environmental Management (EM)

    SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this ...

  10. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  11. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Energy Savers [EERE]

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  12. Requirements-Based Surveillance and Maintenance Review Guide...

    Office of Environmental Management (EM)

    Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to ...

  13. Revenue Requirements Modeling System (RRMS) documentation. Volume II. Appendix D: operator's manual; Appendix E: program maintenance guide. Final report. [COMPUSTAT II

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Revenue Requirements Modeling System (RRMS) is a utility specific financial modeling System used by the Energy Information Administration (EIA) to evaluate the impact on electric utilities of changes in the regulatory, economic and tax environments. Included in the RRMS is a power plant life-cycle revenue requirements model designed to assess the comparative economic advantage of alternative generating plant. This report is Volume II of a 2 volume set and provides a programmer's guide which describes new user initialization procedures and data base update procedures. This report also provides a software maintenance guide which contains listings of all computer code for the models. Volume I provides a methodology description and user's guide, a model abstract and technical appendix, and sample input and output for the models.

  14. Surveillance & Maintenance: The Requirements Based Surveillance and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Review Process (RBSM) | Department of Energy Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in

  15. Requirements Based Surveillance and Maintenance Review Process Interview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form | Department of Energy Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form (313.11 KB) More Documents & Publications Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Guidance to Completing the Self-Directed RBSM Interview Form CX-000473: Categorical Exclusion

  16. Web Maintenance Requirements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Read more about EERE's expectations for website maintenance. Maintenance Schedule All Web ... Learn more about content analysis. Attend semi-annual Web Governance Team meetings. Twice ...

  17. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  18. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance ... to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). ...

  19. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Planning and Reporting for Operations and Maintenance in Federal Energy ...

  20. REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I. Approximate number of personnel and man-hours required to complete the activity ... time) Number of Personnel:... Man- Hours:... J. Comments: RBSM ...

  1. ARM - Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    StatisticsReporting Requirements 2016 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) Past Quarterly Reports Historical Statistics Field Campaigns Operational Visitors and Accounts Data Archive and Usage (October 1995 - Present) Reporting Requirements As a matter of government policy, all U.S. Department of Energy user facilities, including the ARM Climate Research Facility, have a number of reporting requirements. The Facility is required to

  2. Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Editors, "High Energy Physics and Nuclear Physics Network Requirements - Final Report", ESnet Network Requirements Workshop, August 2013, LBNL 6642E Download File: HEP-NP-Net-Req...

  3. Long-Term Surveillance and Maintenance Program 2003 Report |...

    Broader source: Energy.gov (indexed) [DOE]

    Long-Term Surveillance and Maintenance Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report (8.41 MB) More Documents & Publications Long-Term Surveillance ...

  4. Design requirements for orbit maintenance of SPS elements

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    The objective of this study is to identify the design and operational requirements that will be imposed by the need to avoid unplanned reentry of SPS elements. The LEO Staging Base, Electric Orbit Transfer Vehicle, the LEO Construction Base, and SPS Self-Power Module are the SPS elements selected for this analysis. The orbit decay rates and attitude control/orbit maintenance propellant requirements for nominal and worst case conditions are defined. The sequence of events that could cause unplanned reentry are defined. The design and operational requirements that will be used to prevent the various elements from deorbiting are defined.

  5. Planning and Reporting for Operations and Maintenance in Federal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savings Performance Contracts | Department of Energy Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Document provides guidance on energy savings performance contract (ESPC) project development for: Allocating operations and maintenance (O&M) and repair and replacement (R&R) responsibilities Putting in place O&M reporting

  6. Federal Facilities Maintenance, Repair Report Calls for Action

    SciTech Connect (OSTI)

    Bartlett, Rosemarie

    2012-10-01

    This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

  7. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... No Data U.S. Department of Energy Annual Report of Site Surveillance and Maintenance ... standard of 10 mgL. Location GS13 clearly shows the effects of the former Solar Ponds. ...

  8. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... of Energy Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site-CY 2015 April 2016 Doc. No. S13696 Page 27 The inverter for the solar power ...

  9. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ...second ft feet ftyr feet per year SEP Solar Evaporation Pond WL water level yr years U.S. Department of Energy Annual Report of Site Surveillance and Maintenance ...

  10. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  11. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2011-12-14

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  12. CleanFleet. Final report: Volume 3, vehicle maintenance and durability

    SciTech Connect (OSTI)

    1995-12-01

    CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

  13. Updated Reporting Requirement Checklists and Research Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy ...

  14. Evaluation of NRC maintenance team inspection reports for managing aging

    SciTech Connect (OSTI)

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC (Nuclear Regulatory Commission) has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab.

  15. DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance...

    Broader source: Energy.gov (indexed) [DOE]

    Report 20.4, which is part of a series of investigations on LED PAR38 lamps. Report 20.4 focuses on lumen maintenance, chromaticity maintenance, and catastrophic failure in 32 of ...

  16. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection, LLC | Department of Energy Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two

  17. 2003 Long-Term Surveillance and Maintenance Program Report

    SciTech Connect (OSTI)

    2004-07-01

    are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  18. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    .........24 2.7.3 Solar Ponds Plume Treatment System ... Maintenance Activities at the Rocky Flats Site-CY 2015 U.S. Department of Energy Doc. No. ...

  19. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... Maintenance Activities at the Rocky Flats Site-CY 2015 U.S. Department of Energy Doc. No. ... POE Point of Evaluation; PV photovoltaic; SPPTS Solar Ponds Plume Treatment System

  20. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Environmental Management (EM)

    LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, ... and findings made during the maintenance outages for Pepco's two 230 kV circuits from the ...

  1. Lessons learned from substation predictive maintenance project, TC project {number_sign}7014. Final report

    SciTech Connect (OSTI)

    Geisecke, J.; Spencer, G.; Richardson, F.

    1998-12-01

    The EPRI Maintenance and Diagnostics Center, through a tailored collaboration effort with 10 utilities, developed a Substation Predictive Maintenance Program (SPDM). The objective of the program was to reduce Operation and Maintenance (O and M) costs by applying predictive/condition based maintenance practices to energized substation equipment. This report presents a summary of the project including: how new and existing diagnostic technologies and equipment were evaluated and utilized; how information was gathered in program cost justification and savings and specific work procedures and program administrative aids for a SPDM process. The program was effective in implementing a preventive or condition based maintenance process for participating utilities--enhancing the prioritization or work, redirecting maintenance activity and reducing costs. This document can serve as an implementation guide with lessons learned for substation predictive maintenance processes or to compare and contrast programs currently in place.

  2. DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance of LED PAR38 Lamps

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's CALiPER program has released Report 20.4, which is part of a series of investigations on LED PAR38 lamps. Report 20.4 focuses on lumen maintenance, chromaticity...

  3. Managing aging in nuclear power plants: Insights from NRC`s Maintenance Team Inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.

    1992-12-31

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified.

  4. Managing aging in nuclear power plants: Insights from NRC's Maintenance Team Inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.

    1992-01-01

    A plant's maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of sixty-seven of the reports issued on these in-depth team inspections have been reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant structures, systems, and components (SSCs). Relevant information has been extracted from these inspection reports sorted into several categories; including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified.

  5. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  6. Precursor Report of Data Needs and Recommended Practices for PV Plant Availability Operations and Maintenance Reporting.

    SciTech Connect (OSTI)

    Hill, Roger R.; Klise, Geoffrey Taylor; Balfour, John R.

    2015-01-01

    Characterizing the factors that affect reliability of a photovoltaic (PV) power plant is an important aspect of optimal asset management. This document describes the many factors that affect operation and maintenance (O&M) of a PV plant, identifies the data necessary to quantify those factors, and describes how data might be used by O&M service providers and others in the PV industry. This document lays out data needs from perspectives of reliability, availability, and key performance indicators and is intended to be a precursor for standardizing terminology and data reporting, which will improve data sharing, analysis, and ultimately PV plant performance.

  7. Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports

    SciTech Connect (OSTI)

    Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J.

    1993-12-01

    A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

  8. INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY2006

    SciTech Connect (OSTI)

    B. E. Olaveson

    2006-10-02

    This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during Fiscal Year 2006. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document.

  9. Individual Reporting Requirements | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Individual Reporting Requirements DOE Order 472.2, Personnel Security, sets forth reporting requirements for all DOE employees, contractors, and others involved in applying for or holding a DOE access authorization. Reporting must be done verbally within two business days of the event followed by a written confirmation within three additional business days to the Office of Personnel and Facility Clearances and Classification (OPFCC), to include: Legal action effected

  10. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  11. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    2011-03-01

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  12. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    the system in support of Federal Personnel. 2. General Requirements 2.1 Capacity- The Web-Based Reporting System shall have the capacity to contain all documents, including task ...

  13. INL Sitewide Operations and Maintenance Report for CERCLA Response Actions - FY 2005

    SciTech Connect (OSTI)

    D. R. Fitch

    2005-09-22

    This report documents how remedies mandated by the Comprehensive Environmental Response, Compensation, and Liability Act for the Idaho National Laboratory Site were operated and maintained during fiscal year 2005. The activities addressed in the INEEL Sitewide Operations and Maintenance Plan are reported in this document. Waste Area Groups 7 and 8 are not reported in this document. Waste Area Group 7 is an operating facility, and the status of its operations is reported directly to the regulatory agencies. Waste Area Group 8 is excluded from this report, because it falls outside the direct control of U.S. Department of Energy Idaho Operations Office. The INEEL Sitewide Institutional Controls Plan discusses the inspection, maintenance, repair, and reporting activities involving institutional controls at the Idaho National Laboratory Site. Therefore, the maintenance of institutional controls is not discussed in this report. The Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan provides a reference to support this report by providing current and projected facility and land uses and by listing the Comprehensive Environmental Response, Compensation, and Liability Act sites.

  14. Smart gun technology requirements preliminary report

    SciTech Connect (OSTI)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  15. Policy Flash 2013-49 Updating Reporting Requirement Checklist...

    Energy Savers [EERE]

    Policy Flash 2013-49 Updating Reporting Requirement Checklist including the research performance progress report Policy Flash 2013-49 Updating Reporting Requirement Checklist...

  16. FY09_Federal_Real_Property_Reporting_Requirements.pdf | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    yReportingRequirements.pdf More Documents & Publications 2013 guidance fo real Property Inventory Reporting FY 2012 Federal Real Property Reporting Requirement Guidance for...

  17. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    SciTech Connect (OSTI)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  18. Natural resources management activities and biodiversity maintenance. Progress report, July 1, 1993--June 30, 1994

    SciTech Connect (OSTI)

    Caudell, M.B.

    1994-05-01

    This progress report briefly outlines activities at the Crackerneck Wildlife Management Area. Thirty-nine days were spent administering hunts with 1524 people participating. Biological data was collected on 89 deer, 6 turkeys, 8 feral hogs, 40 ducks of two species, 24 bobwhite, 3 rabbits, 2 gray squirrels, and 313 fish of 8 species. Public relations, maintenance and hunt preparation activities are summarized as well.

  19. UC 9-8-307 - Antiquities Discovery Reporting Requirements | Open...

    Open Energy Info (EERE)

    UC 9-8-307 - Antiquities Discovery Reporting RequirementsLegal Abstract Sets forth reporting requirements for discovery of archaeological resources on nonfederal lands....

  20. FY 2014 Federal Real Property Reporting Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Real Property Reporting Requirement FY 2014 Federal Real Property Reporting Requirement FIMS FRPP FY 2014 Reporting Instructions Signed Sep 18 2014 .pdf (6.19 MB) More Documents & Publications Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY09_Federal_Real_Property_Reporting_Requirements.pdf FY 2012 Federal Real Property Reporting Requirement

  1. Report of the Federal Internetworking Requirements Panel

    SciTech Connect (OSTI)

    1994-05-31

    The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

  2. Letter to EECBG Recipients on Changes to Reporting Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy EECBG Recipients on Changes to Reporting Requirements Letter to EECBG Recipients on Changes to Reporting Requirements eecbg_reporting_pre-guidance_announcement_06072011.pdf (95.94 KB) More Documents & Publications Reporting Pre-guidance Announcement 06-02-2011 Letter to SEP Recipients on Changes to Reporting Requirements SEP/EECBG Reporting Guidance FAQs

  3. Reporting Requirements for EERE Funding Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirements for EERE Funding Awards Reporting Requirements for EERE Funding Awards All recipients of Office of Energy Efficiency and Renewable Energy (EERE) funding will be required to do periodic reporting on their projects. The Federal Assistance Reporting Checklist and Instructions is part of the cooperative agreement that all awardees receive. It lists all of the required deliverables for a specific agreement, including the reporting requirements. Example Reports Some of the

  4. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    SciTech Connect (OSTI)

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

  5. Federal Agency Facility Reporting Requirements and Performance Data |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reporting & Data » Federal Agency Facility Reporting Requirements and Performance Data Federal Agency Facility Reporting Requirements and Performance Data The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts for federal facilities. FEMP also collects and publishes agency performance data. Reporting Requirements Agencies are required to report progress

  6. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  7. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  8. Updated Reporting Requirement Checklists and Research Performance Progress

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report (RPPR) | Department of Energy Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy Flash 2011-46, transmitted updated copies of the Reporting Requirements Checklist to add coverage for For-Profit audits. This Flash transmits additional updates to the checklists to clarify the submission instructions for the For-Profit audit reports and to make some additional

  9. Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End Summary Report

    Broader source: Energy.gov [DOE]

    The Long-Term Surveillance Operations and Maintenance (LTS–O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE) Office of...

  10. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    ... Appendix C: DOE Budget and Cost ReportInternational Contribution Cost Report 1. Title: ... Executive summary of construction, installation and integration activities b. *Final ...

  11. BER Science Network Requirements (Technical Report) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: BER Science Network Requirements Citation Details In-Document Search Title: BER Science Network Requirements The Energy Sciences Network (ESnet) is the primary ...

  12. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and ...

  13. Microsoft Word - Attachment B - Reporting Requirements.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-SOL-0003339 J.1 ATTACHMENT B - REPORTING REQUIREMENTS REPORTING REQUIREMENTS CHECKLIST 1. AWARDEE: 2. IDENTIFICATION NUMBER: REPORT SUBMISSION: Reports shall be submitted to the electronic addresses indicated in the NETL-identified distribution list provided in the post award debriefing. Electronic copies of each report must be submitted to the Contract Specialist (CS) and Contracting Officer's Representative (COR). 4. PLANNING AND REPORTING REQUIREMENTS FORM NO. FREQ. NO. OF COPIES FORM NO.

  14. FY 2012 Federal Real Property Reporting Requirement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Instructions 2012 final.pdf More Documents & Publications 2013 guidance fo real Property Inventory Reporting FY09FederalRealPropertyReportingRequirements.pdf Guidance for...

  15. Federal Comprehensive Annual Energy Reporting Requirements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Reporting Requirements Federal Comprehensive Annual Energy Reporting Requirements The Federal Energy Management Program (FEMP) provides federal agencies with resources for reporting annual progress made toward efficiency mandates. Section 548(a) of National Energy Conservation Policy Act (NEPCA) (42 U.S.C. 8258(a)) requires federal agencies to submit to the U.S. Department of Energy an annual report that describes activities to meet the energy management requirements of Section 543 of

  16. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  17. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  18. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  19. NERSC HPC Program Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 NERSC-NP2017FINAL.pdf | Adobe Acrobat PDF file ...

  20. Final Report on the Operation and Maintenance Improvement Program for Concentrating Solar Power Plants

    SciTech Connect (OSTI)

    Cohen Gilbert E.; Kearney, David W.; Kolb, Gregory J.

    1999-06-01

    This report describes the results of a six-year, $6.3 million project to reduce operation and maintenance (O&M) costs at power plants employing concentrating solar power (CSP) technology. Sandia National Laboratories teamed with KJC Operating Company to implement the O&M Improvement Program. O&M technologies developed during the course of the program were demonstrated at the 150-MW Kramer Junction solar power park located in Boron, California. Improvements were made in the following areas: (a) efficiency of solar energy collection, (b) O&M information management, (c) reliability of solar field flow loop hardware, (d) plant operating strategy, and (e) cost reduction associated with environmental issues. A 37% reduction in annual O&M costs was achieved. Based on the lessons learned, an optimum solar- field O&M plan for future CSP plants is presented. Parabolic trough solar technology is employed at Kramer Junction. However, many of the O&M improvements described in the report are also applicable to CSP plants based on solar power tower or dish/engine concepts.

  1. HEP Science Network Requirements--Final Report

    SciTech Connect (OSTI)

    Bakken, Jon; Barczyk, Artur; Blatecky, Alan; Boehnlein, Amber; Carlson, Rich; Chekanov, Sergei; Cotter, Steve; Cottrell, Les; Crawford, Glen; Crawford, Matt; Dart, Eli; Dattoria, Vince; Ernst, Michael; Fisk, Ian; Gardner, Rob; Johnston, Bill; Kent, Steve; Lammel, Stephan; Loken, Stewart; Metzger, Joe; Mount, Richard; Ndousse-Fetter, Thomas; Newman, Harvey; Schopf, Jennifer; Sekine, Yukiko; Stone, Alan; Tierney, Brian; Tull, Craig; Zurawski, Jason

    2010-04-27

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity

  2. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities First Quarter Calendar Year 2016

    Office of Legacy Management (LM)

    First Quarter Calendar Year 2016 July 2016 LMS/RFS/S14430 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-1st Quarter CY 2016 July 2016 Doc. No. S14430 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  3. Rocky Flats, Colorado, Site Quarterly Report of Site Surveillance and Maintenance Activities Third Quarter Calendar Year 2013

    Office of Legacy Management (LM)

    Third Quarter Calendar Year 2014 January 2015 LMS/RFS/S12555 This page intentionally left blank U.S. Department of Energy Rocky Flats Site Quarterly Report of Site Surveillance and Maintenance Activities-3rd Quarter CY 2014 January 2015 Doc. No. S12555 Page i Contents Abbreviations ................................................................................................................................. iv 1.0 Introduction

  4. Review Policy / Proposal Guidelines / Reporting Requirements| U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) Review Policy / Proposal Guidelines / Reporting Requirements High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management Acknowledgements of Federal

  5. Annual summary report of the Decontamination and Decommissioning Surveillance and Maintenance Program at Oak Ridge National Laboratory for period ending September 30, 1994

    SciTech Connect (OSTI)

    Anderson, L.A.; Burwinkle, T.W.; Ford, M.K.; Gaddis, H.R.; Holder, L. Jr.; Mandry, G.J.; Nelson, T.R.; Patton, B.D.

    1995-03-01

    The Surplus Facilities Management Program (SFMP) was established at Oak Ridge National Laboratory (ORNL) in 1976 to provide collective management of all surplus sites under ORNL`s control on the Oak Ridge Reservation. Presently, over 50 facilities, grouped into projects, are currently managed by the Decontamination and Decommissioning Program, the successor program to the SFMP. Support includes (1) surveillance and maintenance planning; (2) routine surveillance and maintenance; and (3) special maintenance projects. This report documents routine surveillance and maintenance, special projects, and special maintenance performed on these facilities for the period of October 1993 through September 1994.

  6. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy EISA Federal Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA 432) requires federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each federal agency must designate an energy manager to be responsible for

  7. DOE Recovery Act Reporting Requirements for the State Energy Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Recovery Act Reporting Requirements for the State Energy Program DOE Recovery Act Reporting Requirements for the State Energy Program U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) State Energy Program (SEP) reporting requirements for states and U.S. territories receiving SEP grants under the 2009 Recovery Act. sep_arra_reporting_requirements.pdf (228.32 KB) More Documents & Publications EECBG Program Notice 10-07A WPN 10-13a:

  8. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and...

    Broader source: Energy.gov (indexed) [DOE]

    ldvehicles.pdf (765.43 KB) More Documents & Publications WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials ...

  9. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015...

    Broader source: Energy.gov (indexed) [DOE]

    Companies with authorizations to export LNG are required to file, on a semi-annual basis, written reports describing the progress of the planned liquefaction facility project that...

  10. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K.

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  11. Quarterly Reports 2016 as Required by Admin Orders

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Quarterly Report 2016 Quarterly Report for the Reporting Period between April 1, 2016, through June 30, 2016, as required by NMED Administrative Orders dated February 27, 2014, and May 12, 2014, as amended by NMED Directives dated August 29, 2014, December 9, 2014, July 15, 2015, and February 26, 2016 Waste Isolation Pilot Plant Hazardous Waste Facility Permit Number: NM4890139088-TSDF Todd Shrader/CBFO and Phillp J. Breidenbach/NWP dated July 29, 2016. Quarterly Report for the Reporting Period

  12. Updated Reporting Requirement Checklist including the Research Performance Progress Report (RPPR)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Policy Flash 2011-63 transmitted the previous versions of the Reporting Requirements Checklists and the Research Performance Progress Report (RPPR) which was an attachment to the checklist.

  13. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance:technical maintenanceandcontent maintenance....

  14. FY 2014 Real Property Data Related to Operations and Maintenance Guidance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY_2014_Data_Related_to_Operations_and_Maintenance_Memorandum.pdf (494.62 KB) More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY 2012 Real Property Deferred, Actual, and

  15. CALiPER Report 20.4: Lumen and Chromaticity Maintenance of LED PAR38 Lamps Operated in Steady-State Conditions

    SciTech Connect (OSTI)

    none,

    2014-12-30

    This CALiPER report focuses on lumen maintenance, chromaticity maintenance, and catastrophic failure in 32 of the Series 20 LED PAR38 lamps and 8 benchmark lamps, which were monitored for nearly 14,000 hours at ambient temperatures between 44°C and 45°C.

  16. Rescission of American Recovery and Reinvestment Act Reporting Requirements

    Broader source: Energy.gov [DOE]

    Financial Assistance Letter (FAL) 2014-xx provides COs with: 1) notice of the recession of the reporting requirements for recipients of ARRA funds in accordance with the recently passed P.L. 113-76, Consolidated Appropriations Act, 2014

  17. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    SciTech Connect (OSTI)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  18. Technology Requirements for In-Situ Decommissioning Workshop Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Services » Site & Facility Restoration » Deactivation & Decommissioning (D&D) » D&D Workshops » Technology Requirements for In-Situ Decommissioning Workshop Report Technology Requirements for In-Situ Decommissioning Workshop Report In recognition of the increasing attention being focused on In Situ Decommissioning (ISD or entombment) as an acceptable and beneficial decommissioning end state, EM is developing guidance for the implementation of ISD of

  19. Y-12 Groundwater Protection Program CY 2009 Triennial Report Of The Monitoring Well Inspection And Maintenance Program, Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2013-06-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspection events conducted on active and inactive wells at Y-12 during calendar years (CY) 2007 through 2009; it documents well maintenance and plugging and abandonment activities completed since the last triennial inspection event (CY 2006); and provides summary tables of well inspection events, well maintenance events, and well plugging and abandonment events during the reference time period.

  20. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    SciTech Connect (OSTI)

    Sellman, Jake; Dykstra, Tim

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  1. Capital budgeting for utilities: The revenue requirements method: Final report

    SciTech Connect (OSTI)

    Not Available

    1986-10-01

    This report is an exposition of the revenue requirements method for project evaluation in the electric utility industry. The results are developed from first principles of economics and finance. Application of the results is illustrated by a series of hypothetical calculations. Revenue requirements are a way of expressing the costs associated with an investment. The revenue requirements method can be used to choose among alternatives that provide an equivalent amount and quality of service. If alternatives do not provide equivalent service, then the appropriate economic comparison depends on the value of service as well as the cost. Market discount rates rather than so-called ''customer discount rates'' should be used to calculate the present value of revenue requirements. In general, however, the risk-adjusted discount rates that are appropriate for calculating the present value of revenue requirements differ from those used to calculate net present value.

  2. CALiPER Report 20.4: Lumen and Chromaticity Maintenance of LED...

    Energy Savers [EERE]

    ... Report 20.2: Dimming, Flicker, and Power Quality Characteristics of LED PAR38 Lamps (March 2014) 9 This report focused on the flicker and power quality performance of the Series 20 ...

  3. Revenue Requirements Model (RRM) documentation. Final report (Revised)

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The Revenue Requirements Model (RRM) is designed to estimate the impact of various regulatory and economic policy variables on the total revenue requirements of electric utilities. The RRM is built to utilize financial data extracted from the Standard and Poor's (S and P) Compustat II Utility data base (a proprietary data base). The RRM uses a simplified regulatory accounting framework to estimate the cost of service of the electric operations of utilities. The RRM is written in SAS, a proprietary software system. The RRM produces a series of reports including a summary of key data utilized therein, an income statement, revenue requirements, and selected key financial measures. Each report includes estimates for a base case and a hypothetical case. 4 figures, 6 tables.

  4. TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements

    SciTech Connect (OSTI)

    Alan Bond

    2001-04-01

    This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

  5. Natural resources management activity and biodiversity maintenance. Progress report, July 1, 1992--June 30, 1993

    SciTech Connect (OSTI)

    Caudell, M.B.

    1993-05-01

    Activities in coordinating land use for the Savannah River Site public lands during the period of July 1, 1992 to June 30, 1993 are reported.

  6. Y-12 Groundwater Protection Program CY2012 Triennial Report Of The Monitoring Well Inspection And Maintenance Program Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    2013-09-01

    This document is the triennial report for the Well Inspection and Maintenance Program of the Y- 12 Groundwater Protection Program (GWPP), at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12). This report formally documents well inspections completed by the GWPP on active and inactive wells at Y-12 during calendar years (CY) 2010 through 2012. In addition, this report also documents well inspections performed under the Y-12 Water Resources Restoration Program, which is administered by URS|CH2M Oak Ridge (UCOR). This report documents well maintenance activities completed since the last triennial inspection event (CY 2009); and provides summary tables of well inspections and well maintenance activities during the reference time period.

  7. Operations other than war: Requirements for analysis tools research report

    SciTech Connect (OSTI)

    Hartley, D.S. III

    1996-12-01

    This report documents the research effort to determine the requirements for new or improved analysis tools to support decisions at the strategic and operational levels for military Operations Other than War (OOTW). The work was performed for the Commander in Chief, U.S. Pacific Command (USCINCPAC). The data collection was based on workshops attended by experts in OOTWs: analysis personnel from each of the Combatant Commands, the Services, the Office of the Secretary of Defense (OSD), the Joint Staff, and other knowledgeable personnel. Further data were gathered from other workshops and conferences and from the literature. The results of this research begin with the creation of a taxonomy of OOTWs: categories of operations, attributes of operations, and tasks requiring analytical support. The tasks are connected to the Joint Staff`s Universal Joint Task List (UJTL). Historical OOTWs are analyzed to produce frequency distributions by category and responsible CINC. The analysis products are synthesized into a list of requirements for analytical tools and definitions of the requirements. The report concludes with a timeline or roadmap for satisfying the requirements.

  8. Moly99 Production Facility: Report on Beamline Components, Requirements, Costs

    SciTech Connect (OSTI)

    Bishofberger, Kip A.

    2015-12-23

    In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introduced briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.

  9. Basic Energy Sciences Network Requirements Review Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Review Final Report September 9-10, 2014 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any

  10. Expert Meeting Report. Key Innovations for Adding Energy Efficiency to Maintenance Projects

    SciTech Connect (OSTI)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic focused on efforts to increase the efficiency of existing homes, specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  11. Report 20.4: Lumen and Chromaticity Maintenance of LED PAR38 Lamps

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) CALiPER program has been purchasing and testing general illumination solid-state lighting (SSL) products since 2006. CALiPER relies on standardized photometric testing (following the Illuminating Engineering Society of North America [IES] approved method LM-79-081) conducted by accredited, independent laboratories. Results from CALiPER testing are available to the public via detailed reports for each product or through summary reports, which assemble data from several product tests and provide comparative analyses. Increasingly, CALiPER investigations also rely on new test procedures that are not industry standards; these experiments provide data that is essential for understanding the most current issues facing the SSL industry.

  12. Development & Maintenance of Testing Standards for Solar Energy Systems - Final Report

    SciTech Connect (OSTI)

    Huggins, Jim; Nelson, Les; Still, Stephen

    2009-09-09

    This is the final report covering a June 2004 through May 2009 grant to support the certification of solar thermal collectors and systems. The Solar Rating and Certification Corporation (SRCC) has developed and maintained minimum standards and performance tests for solar water heating components and systems since 1980. The objective of this project was to continue the SRCC certification program and implement enhancements to the standards and test methods used to determine product durability and calculate performance ratings. This objective was met by supporting the operation of the certification programs and by performing five additional technical tasks that addressed specific areas that were identified for enhancement. Statistics on certifications and lists of issues that were addressed are reported.

  13. Study to develop an inspection, maintenance, and repair plan for OTEC (Ocean Thermal Energy Conversion) modular experiment plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    The inspection, maintenance and repair (IM and R) of the Ocean Thermal Energy Conversion (OTEC) Modular Experiment Plant (Pilot Plant) have been studied in two phases: Task I and Task II. Task I phase developed IM and R identification forms, identified requirements for routine and post casualty IM and R, and categorized and outlined potential procedures to perform IM and R activities. The efforts of the Task II phase have been directed to meet the following objectives: to provide feedback to the OTEC marine systems designs to assure that such designs reflect appropriate consideration of IM and R methods and unit costs, resulting in designs with reduced life cycle costs; to include technical information concerning OTEC IM and R possibilities to NOAA/DOE; to outline a basis in which the anticipated IM and R contributions to life cycle costs can be developed for any specific OTEC plant design; to identify IM and R methods within the state-of-the-art in the offshore industry; to determine the application of potential IM and R procedures for the commercial operation of OTEC 10/40 Pilot Plant(s); and input into the US government formulation of statutory and regulatory IM and R requirements for OTEC plants.

  14. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    SciTech Connect (OSTI)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  15. Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect (OSTI)

    King, David A

    2013-12-12

    ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.

  16. WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy : ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the

  17. WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the

  18. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    29 3.0 Environmental Monitoring 3.1 Water Monitoring 3.1.1 Introduction This section presents data collected to satisfy water monitoring objectives implemented at the Site in accordance with RFLMA Attachment 2, "Legacy Management Requirements," Table 2, "Water Monitoring Locations and Sampling Criteria." The RFSOG provides a guidance framework in support of conducting LM activities, including monitoring, at the Site. This annual report focuses on data collected during CY 2015

  19. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    SciTech Connect (OSTI)

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs.

  20. Assessing and Implementing Long-Term Surveillance and Maintenance Requirements for Remediated Sites Under the Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    Clayton, C.; Widdop, M.

    2007-07-01

    The U.S. Department of Energy (DOE) initiated the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 to address concerns about radiological conditions at locations where work was performed for the Manhattan Engineer District and the U.S. Atomic Energy Commission. The DOE Office of Legacy Management (LM) is responsible for 27 FUSRAP sites and will ultimately assume responsibility for more than 50 FUSRAP sites. DOE-LM assumed responsibility for 25 FUSRAP sites in 2004 and began an assessment of site conditions to ensure that complete site knowledge was preserved in DOE records and that the sites are and will remain protective of human health and the environment. For the assessment, site conditions were assumed to be dynamic. Therefore, the most restrictive site exposure scenarios were considered, as well as the implications for disturbing materials to which supplemental limits were applied. If conditions under these possible future scenarios were found to be protective, no use restrictions were needed. However, if future use or exposure scenarios could result in potential unacceptable risk, restrictions on site use were indicated. The assessment relied on access to documentation of site activities, characteristics, remedial action activities, remediated conditions, and land-use restrictions. In addition, an ongoing program of site visits commenced in 2005. DOE-LM assessed the level of knowledge and sought to identify and preserve site information for use by future custodians. DOE-LM has applied lessons learned in site management since 1989, when a formal DOE program was established to implement long-term surveillance and maintenance (LTS and M) activities. Former FUSRAP staff members with the DOE Office of Environmental Management also conveyed lessons learned. We present the assessment process that was used, the application of results, and a framework for evaluating LTS and M requirements for FUSRAP sites. (authors)

  1. Molten-Caustic-Leaching (Gravimelt) System Integration Project, Phase 2. Topical report for test circuit maintenance, refurbishment, modification, and off-line operation

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This is a report of the maintenance, refurbishment, modifications, and off-line circuit component testing of the integrated test circuit of the Molten-Caustic-Leaching (MCL or Gravimelt) process for the desulfurization and demineralization of coal. The project is sponsored by the Pittsburgh Energy Technology Center of the US Department of Energy under Contract No. DE-AC22-86-PC91257.

  2. Effect of coal quality on maintenance costs at utility plants. Final report. [Effect of ash and sulfur content of coal

    SciTech Connect (OSTI)

    Holt, E.C. Jr.

    1980-06-01

    In an attempt to determine if correlation exists between coal quality, as measured by its ash and sulfur contents, and the maintenance cost at utility plants, an examination was made of the actual maintenance cost experience of selected portions of five TVA coal-fired power plants as a function of the fuel quality consumed during an extended period of time. The results indicate that, according to our decision rules developed in compliance with accepted statistical practices, correlation does exist in many portions of the coal-fired plants for which sufficient maintenance cost records were available. The degree of correlation varies significantly among the individual portions of a particular plant as well as among the various plants. However, the indicators are sufficient to confirm that a change (within the design constraints of the unit) in the ash and/or sulfur content of the coal being consumed by a utility boiler will have a proportionate effect on the maintenance cost at the plant. In the cases examined, each percent variation in ash content could have a monetary effect of from $0.05 to $0.10 per ton of coal consumed. Similarly, each percent variation in sulfur content could influence maintenance costs from $0.30 to $0.50 per ton of coal. Since these values are based on preliminary analysis of limited data, they must be approached with caution and not removed from the context in which they are presented. However, if borne out by further study, the potential magnitude of such savings may be sufficient to justify the acquisition of superior coal supplies, either by changing the source and/or using preparation to obtain a lower ash and sulfur fuel.

  3. Section 1512 Reporting Requirements under ARRA | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements under ARRA More Documents & Publications Appendix B Section 1605 Buy American Provision under ARRA Intelligence Reform and Terrorism Prevention Act - December 17, 2004

  4. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th ...

  5. Reporting Requirements for In-Transit Gas | Department of Energy

    Energy Savers [EERE]

    Projects Now Available | Department of Energy Report on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available Report on Synchrophasor Technologies and Their Deployment in Recovery Act Projects Now Available August 15, 2013 - 10:48am Addthis The Office of Electricity Delivery and Energy Reliability has released a new report that explains synchrophasor technologies and how they can be used to improve the efficiency, reliability, and resiliency of grid

  6. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  7. Microsoft PowerPoint - IAEA Safeguards Reporting Requirements...

    National Nuclear Security Administration (NNSA)

    of America and the International Atomic Energy Agency for the Application of Safeguards ... The reports are converted by NMMSS into the following IAEA data files: * MBR-288-1 ...

  8. Letter to SEP Recipients on Changes to Reporting Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Reporting Pre-guidance Announcement 06-02-2011 Microsoft Word - T4VEICTO2 Sub3Residential Retrofit Program Design Guide Play BookTEAM 4 ...

  9. Nuclear Physics Science Network Requirements Workshop, May 2008 - Final Report

    SciTech Connect (OSTI)

    Tierney, Ed., Brian L; Dart, Ed., Eli; Carlson, Rich; Dattoria, Vince; Ernest, Michael; Hitchcock, Daniel; Johnston, William; Kowalski, Andy; Lauret, Jerome; Maguire, Charles; Olson, Douglas; Purschke, Martin; Rai, Gulshan; Watson, Chip; Vale, Carla

    2008-11-10

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In May 2008, ESnet and the Nuclear Physics (NP) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the NP Program Office. Most of the key DOE sites for NP related work will require significant increases in network bandwidth in the 5 year time frame. This includes roughly 40 Gbps for BNL, and 20 Gbps for NERSC. Total transatlantic requirements are on the order of 40 Gbps, and transpacific requirements are on the order of 30 Gbps. Other key sites are Vanderbilt University and MIT, which will need on the order of 20 Gbps bandwidth to support data transfers for the CMS Heavy Ion program. In addition to bandwidth requirements, the workshop emphasized several points in regard to science process and collaboration. One key point is the heavy reliance on Grid tools and infrastructure (both PKI and tools such as GridFTP) by the NP community. The reliance on Grid software is expected to increase in the future. Therefore, continued development and support of Grid software is very important to the NP science community. Another key finding is that scientific productivity is greatly enhanced by easy researcher-local access to instrument data. This is driving the creation of distributed repositories for instrument data at collaborating institutions, along with a corresponding increase in demand for network-based data transfers and the tools

  10. Final Technical Report DOE Award DE-FG02-07ER41515 QUEST Camera Short Term Maintenance

    Office of Scientific and Technical Information (OSTI)

    DOE Award DE-FG02-07ER41515 QUEST Camera Short Term Maintenance PI: Charles Baltay, Yale University The QUEST large area astronomical camera was installed at the prime focus of the Oschin Schmidt Telescope at the Palomar Observatory in California. The camera was used to carry out a survey of low redshift Type 1a supernovae which are the distance indicators used in the measurement of the expansion history of the universe and thus provided a method to study the nature of the recently discovered

  11. Launch vehicle integration requirements for SP-100. Technical information report

    SciTech Connect (OSTI)

    Shaw, L.T. Jr.; Womack, J.R.

    1984-03-01

    SP-100 is the designation for a nuclear reactor-based power plant being developed for both civil and military missions beginning in the 1990s for such potential space applications as communication satellites, space radar, electric propulsion and space stations. Typically, a system using the SP-100 along with a selected upper stage system would be launched by the National Space Transportation System (NSTS) Space Shuttle System into a near-earth orbit, deployed, and through upper stage propulsion burn(s) be inserted/transferred to its mission orbit. The nature of the advanced design SP-100 payloads using this power plant are physically and functionally compatible with the NSTS and meet the safety requirements thereof. The purpose of this document is to define and present the requirements and interface provisions that, when satisfied, will ensure technical compatibility between SP-100 systems and the NSTS.

  12. Environmental management requirements/defensible costs project. Final report

    SciTech Connect (OSTI)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  13. Class Deviation – Extending the Biobased Product Reporting Requirement

    Broader source: Energy.gov [DOE]

    The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2013-01 to encourage agencies to extend the reporting deadline contained in paragraph (c)(2) of the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, from October 31, 2012 to December 31, 2012. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency Acquisition Letter 2013-01.

  14. Microsoft PowerPoint - IAEA Safeguards Reporting Requirements for U.S. Facilities_Peter Habighorst

    National Nuclear Security Administration (NNSA)

    IAEA Safeguards Reporting Requirements for U.S. Facilities Peter Habighorst, MC&A Branch Chief U.S. Nuclear Regulatory Commission IAEA Nuclear Material Reporting to the IAEA BACKGROUND - Overview of Governing Requirements Reporting Requirements  IAEA Information Circular (INFCIRC)/207, Notification to the Agency of Exports and Imports of Nuclear Material, July 1974  IAEA INFCIRC/288, Agreement between the United States of America and the Agency for Safeguards in the United States,

  15. Photovoltaic module electrical termination design requirement study. Final report

    SciTech Connect (OSTI)

    Mosna, F.J. Jr.; Donlinger, J.

    1980-07-01

    Motorola Inc., in conjunction with ITT Cannon, has conducted a study to develop information to facilitate the selection of existing, commercial, electrical termination hardware for photovoltaic modules and arrays. Details of the study are presented in this volume. Module and array design parameters were investigated and recommendations were developed for use in surveying, evaluating, and comparing electrical termination hardware. Electrical termination selection criteria factors were developed and applied to nine generic termination types in each of the four application sectors. Remote, residential, intermediate and industrial. Existing terminations best suited for photovoltaic modules and arrays were identified. Cost information was developed to identify cost drivers and/or requirements which might lead to cost reductions. The general conclusion is that there is no single generic termination that is best suited for photovoltaic application, but that the appropriate termination is strongly dependent upon the module construction and its support structure as well as the specific application sector.

  16. State Energy Program Notice 10-006D, Reporting Requirements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy State Energy Program Notice 10-006D, Reporting Requirements State Energy Program Notice 10-006D, Reporting Requirements State Energy Program (SEP) Notice 10-006D provides guidance to SEP recipients on the requirements of reporting for SEP Recovery Act awards under the American Recovery and Reinvestment Act of 2009 and SEP formula awards under the Energy Policy and Conservation Act. State Energy Program Notice 10-006D, Reporting Requirements (6.27 MB) More Documents & Publications

  17. TECHNOLOGY REQUIREMENTS FOR IN SITU DECOMMISSIONING WORKSHOP REPORT

    SciTech Connect (OSTI)

    Jannik, T.; Lee, P.; Gladden, J.; Langton, C.; Serrato, M.; Urland, C.; Reynolds, E.

    2009-06-30

    In recognition of the increasing attention being focused on In Situ Decommissioning (ISD or entombment) as an acceptable and beneficial decommissioning end state, the Department of Energy's (DOE) Office of Environmental Management (EM) is developing guidance for the implementation of ISD of excess facilities within the DOE complex. Consistent with the overarching DOE goals for increased personnel and environmental safety, reduced technical uncertainties and risks, and overall gains in efficiencies and effectiveness, EM's Office of Deactivation and Decommissioning and Facility Engineering (EM-23) initiated efforts to identify the technical barriers and technology development needs for the optimal implementation of ISD. Savannah River National Laboratory (SRNL), as the EM Corporate Laboratory, conducted an ISD Technology Needs Workshop to identify the technology needs at DOE sites. The overall goal of the workshop was to gain a full understanding of the specific ISD technical challenges, the technologies available, and those needing development. The ISD Workshop was held December 9-10, 2008 in Aiken, SC. Experienced decommissioning operations personnel from Richland Operations Office (RL), Idaho National Laboratory (INL) and Savannah River Site (SRS) along with scientists and engineers specific expertise were assembled to identify incremental and 'game changing' solutions to ISD technology challenges. The workshop and follow-up activities yielded 14 technology needs statements and the recommendation that EM-23 prioritize and pursue the following specific technology development and deployment actions. For each action, the recommended technology acquisition mechanisms (competitive solicitation (CS) or direct funding (TCR)) are provided. Activities that are time critical for ISD projects, or require unique capabilities that reside in the DOE Laboratory system will be funded directly to those institutions. Activities that have longer lead times and where the private

  18. DATA SHARING REPORT CHARACTERIZATION OF THE SURVEILLANCE AND MAINTENANCE PROJECT MISCELLANEOUS PROCESS INVENTORY WASTE ITEMS OAK RIDGE NATIONAL LABORATORY, Oak Ridge TN

    SciTech Connect (OSTI)

    Weaver, Phyllis C

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)—using the approved Waste Lot (WL) 108.1 profile—the Y-12 Sanitary Landfill (SLF) if appropriate; Energy

  19. Feed Materials Production Center. Final phase-in report volume 1 of 15 operations and maintenance, October 25, 1985--December 31, 1985

    SciTech Connect (OSTI)

    Britton, W.H.

    1986-01-17

    The basic purpose of the transition program in the operations area was to obtain a detailed understanding of the FMPC operations with emphasis on equipment and organization, Also considered in this evaluation were several extant conditions at FMPC which may have significant impact on initiatives adopted in the operations area. These conditions are as follows: capital expenditures over the last several years averaged less than 20% of what might be considered minimum to sustain such a facility in a good operating condition; the production load is ramping up placing greater demands on an old facility; the workforce is relatively inexperienced (68% with less than five (5) years) at FMPC; plans are in place to institute major upgrading of FMPC facilities; the RFP described the need for a major effort in the Environment, Safety and Health Area. Considering the above concerns, the transition program was focused in the following areas: Procedures - An inexperienced workforce operating in an atmosphere requiring rigid compliance with more rigorous environmental criteria necessitates clear, concise up-to-date procedures to enhance performance; Training - New equipment, new people and rigorous environmental constraints demand an aggressive, focused training program. Equipment - Site conditions are not conducive to reliable equipment performance. Specific knowledge of forecasted equipment performance is imperative to control the present and plan the future. Restoration - The massive planned expenditures must be well understood to ensure that the future production needs are satisfied and that priorities are aligned with need. Maintenance - Based on the site descriptions provided in the RFP, it was clear that the past maintenance practice has been reactive. The facility upgrade program, to be successful, must be complemented by an agressively managed maintenance program.

  20. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015 DOCKETS |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015 DOCKETS SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015 DOCKETS Companies with authorizations to export LNG are required to file, on a semi-annual basis, written reports describing the progress of the planned liquefaction facility project that is part of the company's LNG export application and order. These reports are due by April 1 and October 1 of each year, and shall include the following: A

  1. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gaps for Lightweight and Propulsion Materials | Department of Energy Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials wr_trucks_hdvehicles.pdf (811.37 KB) More Documents & Publications WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials Summary of the Output

  2. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lightweight and Propulsion Materials | Department of Energy Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials wr_ldvehicles.pdf (765.43 KB) More Documents & Publications WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials Summary of the Output from the VTP Advanced

  3. CRAD, NNSA - Maintenance (MN) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NNSA - Maintenance (MN) CRAD, NNSA - Maintenance (MN) CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs. CRADs consist of a Performance Objective that identifies the expectation(s) or requirement(s) to be verified, which reflect the complete scope of the assessment; Criteria that provide specifics by which the performance objectives are measured, including

  4. Superconducting Super Collider Magnet System requirements. Revision A

    SciTech Connect (OSTI)

    1986-10-23

    This report discusses the Superconducting Super Collider magnet system requirements when the following categories: Functions; operational performance requirements; system configuration and essential features; structural requirements; availability/reliability; instrumentation and control requirements; design life; environment; maintenance requirements; interface systems; quality assurance; safety; and applicable codes and standards.

  5. Maintenance manual for the Beneficial Uses Shipping System cask. Revision 1

    SciTech Connect (OSTI)

    Bronowski, D.R.; Yoshimura, H.R.

    1993-05-01

    This document is the Maintenance Manual for the Beneficial Uses Shipping System (BUSS) cask. These instructions address requirements for maintenance, inspection, testing, and repair, supplementing general information found in the BUSS Safety Analysis Report for Packaging (SARP), SAND 83-0698. Use of the BUSS cask is authorized by the Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC) for the shipment of special form cesium chloride or strontium flouride capsules.

  6. DATA SHARING REPORT CHARACTERIZATION OF POPULATION 7: PERSONAL PROTECTIVE EQUIPMENT, DRY ACTIVE WASTE, AND MISCELLANEOUS DEBRIS, SURVEILLANCE AND MAINTENANCE PROJECT OAK RIDGE NATIONAL LABORATORY OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    Harpenau, Evan M

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

  7. Annual Report of Site Surveillance and Maintenance Activities at the Rocky Flats Site, Colorado Calendar Year 2015

    Office of Legacy Management (LM)

    Site, Colorado April 2016 Doc. No. S13696 Page 37 3.1.2 Routine Monitoring 3.1.2.1 POC Monitoring This objective deals with monitoring surface water at the COU boundary in Woman and Walnut Creeks to demonstrate compliance with surface-water quality standards (Table 1 of RFLMA Attachment 2). Water-quality data at POCs can trigger reportable conditions under RFLMA when the applicable evaluation parameters are greater than the corresponding Table 1 values (see Appendix D). Surface water at the

  8. Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act (CEQ, 2004)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA).

  9. NREL Report Firms Up Land-Use Requirements of Solar - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report Firms Up Land-Use Requirements of Solar Study shows solar for 1,000 homes would require 32 acres July 30, 2013 The Energy Department's National Renewable Energy Laboratory (NREL) has published a report on the land use requirements of solar power plants based on actual land-use practices from existing solar facilities. "Having real data from a majority of the solar plants in the United States will help people make proper comparisons and informed decisions," lead author Sean Ong

  10. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VEHICLES TECHNOLOGIES OFFICE WORKSHOP REPORT: Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials February 2013 FINAL REPORT This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any

  11. FES Science Network Requirements - Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008

    SciTech Connect (OSTI)

    Tierney, Brian; Dart, Eli; Tierney, Brian

    2008-07-10

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In March 2008, ESnet and the Fusion Energy Sciences (FES) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the FES Program Office. Most sites that conduct data-intensive activities (the Tokamaks at GA and MIT, the supercomputer centers at NERSC and ORNL) show a need for on the order of 10 Gbps of network bandwidth for FES-related work within 5 years. PPPL reported a need for 8 times that (80 Gbps) in that time frame. Estimates for the 5-10 year time period are up to 160 Mbps for large simulations. Bandwidth requirements for ITER range from 10 to 80 Gbps. In terms of science process and collaboration structure, it is clear that the proposed Fusion Simulation Project (FSP) has the potential to significantly impact the data movement patterns and therefore the network requirements for U.S. fusion science. As the FSP is defined over the next two years, these changes will become clearer. Also, there is a clear and present unmet need for better network connectivity between U.S. FES sites and two Asian fusion experiments--the EAST Tokamak in China and the KSTAR Tokamak in South Korea. In addition to achieving its goal of collecting and characterizing the network requirements of the science endeavors funded by the FES Program Office, the workshop emphasized that there is a need for research into better ways of conducting remote

  12. DOE-HDBK-1117-99; Guide to Good Practices for Maintenance Supervisor...

    Office of Environmental Management (EM)

    ... commitments * Reporting of facility problems, including technical safety ... relations * Maintenance managers * Emergency planningpreparedness coordinators * Reactor ...

  13. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J.

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  14. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair; Veers, Paul S.

    2009-09-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a list of the data needed to support reliability and availability analysis, and gives specific recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of fielded wind turbines. This report is intended to help the reader develop a basic understanding of what data are needed from a Computerized Maintenance Management System (CMMS) and other data systems, for reliability analysis. The report provides: (1) a list of the data needed to support reliability and availability analysis; and (2) specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and a wider variety of analysis and reporting needs.

  15. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    SciTech Connect (OSTI)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  16. Emergency diesel generator: Maintenance and failure unavailability, and their risk impacts

    SciTech Connect (OSTI)

    Samanta, P.; Kim, I.; Uryasev, S.; Penoyar, J.; Vesely, W.

    1994-11-01

    Emergency Diesel Generators (EDGs) provide on-site emergency alternating current (ac) electric power for a nuclear plant in the event that all off-site power sources are lost. Existing regulations establish requirements for designing and testing of these on-site power sources to reduce to an acceptable level the probability of losing all ac power sources. Operating experience with EDGs has raised questions about their testing and maintenance to achieve the EDG reliability levels and the total EDG unavailability experienced (fraction of time EDG is out-of-service due to testing, maintenance, and failures). In this report, recent operating experience is used to assess EDG unavailability due to testing, maintenance, and failures during reactor power operation and during plant shutdown. Recent data show an improvement in EDG reliability, but an increase in EDG unavailability due to maintenance, a significant portion of which is due to routinely scheduled maintenances. Probabilistic safety assessments (PSAs) of selected nuclear power plants are used to assess the risk impact of EDG unavailability due to maintenance and failure during power operation, and during different stages of plant shutdown. The results of these risk analyses suggest qualitative insights for scheduling EDG maintenance that will have minimal impact on risk of operating nuclear power plants.

  17. Proceedings: 1996 EPRI fossil plant maintenance conference

    SciTech Connect (OSTI)

    1996-07-01

    EPRI sponsors many conferences and workshops addressing various aspects of fossil power plant maintenance. Featured have been topics such as inspection methods, life assessment techniques, overhaul planning, predictive maintenance programs, thermography, vibration monitoring, welding, and component-specific events on boilers, condensers, feedwater heaters, generators, and turbines. The 1996 EPRI Fossil Plant Maintenance Conference-held July 29-August 1, 1996, in Baltimore, Maryland-reached a wider audience by providing a forum to discuss all aspects of fossil plant maintenance. Knowledgeable industry personnel exchanged information on state-of-the-art technology; identified major unresolved problems; and helped establish priorities for further research, development, and demonstration in fossil plant maintenance. This document presents report presented at the conference. Individual papers have been processed separately for the United States Department of Energy databases.

  18. Residential Solar Permit Requirements

    Broader source: Energy.gov [DOE]

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  19. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  20. International shock-wave database project : report of the requirements workshop.

    SciTech Connect (OSTI)

    Aidun, John Bahram; Lomonosov, Igor V.; Levashov, Pavel R.

    2012-03-01

    We report on the requirements workshop for a new project, the International Shock-Wave database (ISWdb), which was held October 31 - November 2, 2011, at GSI, Darmstadt, Germany. Participants considered the idea of this database, its structure, technical requirements, content, and principles of operation. This report presents the consensus conclusions from the workshop, key discussion points, and the goals and plan for near-term and intermediate-term development of the ISWdb. The main points of consensus from the workshop were: (1) This international database is of interest and of practical use for the shock-wave and high pressure physics communities; (2) Intermediate state information and off-Hugoniot information is important and should be included in ISWdb; (3) Other relevant high pressure and auxiliary data should be included to the database, in the future; (4) Information on the ISWdb needs to be communicated, broadly, to the research community; and (5) Operating structure will consist of an Advisory Board, subject-matter expert Moderators to vet submitted data, and the database Project Team. This brief report is intended to inform the shock-wave research community and interested funding agencies about the project, as its success, ultimately, depends on both of these groups finding sufficient value in the database to use it, contribute to it, and support it.

  1. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11142011 - 11182011 ...

  2. Annual summary report of the Decontamination and Decommissioning surveillance and maintenance program at Oak Ridge National Laboratory for period ending September 30, 1992

    SciTech Connect (OSTI)

    Ford, M.K.; Holder, L. Jr.

    1992-09-01

    The Oak Ridge National Laboratory (ORNL) Decontamination and Decommissioning (D D) Program is part of the Department of Energy (DOE) Environmental Restoration D D Program and has continued to provide surveillance and maintenance (S M) support for 34 surplus facilities. The objectives are (1) to ensure adequate containment of residual radioactive materials remaining in the facilities, (2) to provide safety and security controls to minimize the potential hazards to on-site personnel and to the general public, and (3) to manage the facilities in the most cost-effective manner while awaiting decommissioning. This support has included work in three principal areas: (1) S M planning, (2) routine S M, and (3) special projects designed to correct serious facility deficiencies beyond the scope of routine maintenance.

  3. Genepool Quarterly Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Genepool Quarterly Maintenance Genepool Quarterly Maintenance November 7, 2012 by Kirsten Fagnan The Genepool cluster will be offline for maintenance next Tuesday, November 13th from 7:00 am to 7:00 pm (PST). During this time staff will upgrade the Genepool compute nodes to Debian 6. Also, the firmware for /projectb and /house will be updated. /projectb will be unavailable from 7:00 am to 7:00 pm (PST) and /house will be unavailable from 8:00 am to 1:00 pm (PST). Any webservices or workflows

  4. Technology and Research Requirements for Combating Human Trafficking: Enhancing Communication, Analysis, Reporting, and Information Sharing

    SciTech Connect (OSTI)

    Kreyling, Sean J.; West, Curtis L.; Olson, Jarrod

    2011-03-17

    DHS’ Science & Technology Directorate directed PNNL to conduct an exploratory study on the domain of human trafficking in the Pacific Northwest in order to examine and identify technology and research requirements for enhancing communication, analysis, reporting, and information sharing – activities that directly support efforts to track, identify, deter, and prosecute human trafficking – including identification of potential national threats from smuggling and trafficking networks. This effort was conducted under the Knowledge Management Technologies Portfolio as part of the Integrated Federal, State, and Local/Regional Information Sharing (RISC) and Collaboration Program.

  5. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

  6. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  7. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1.1 Chapter 11 Ten Steps to Operational Efficiency Step 1: Strive to increase management awareness and appreciation of the operations and maintenance program/department. * Consider developing a maintenance mission statement and requesting/requiring management sign-off. * Consider developing a maintenance plan and requesting/requiring management sign-off. * Begin the development of the OMETA linkages. - Develop key points of contact within other departments that can participate in the O&M

  8. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    SciTech Connect (OSTI)

    2000-08-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

  9. High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment report

    SciTech Connect (OSTI)

    Biebesheimer, E., Westinghouse Hanford Co.

    1996-09-30

    This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Report for the subject facility, represents the results of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. It contains; compliance status, remedial actions, and an implementing manuals report linking S/RID elements to requirement source to implementing manual and section.

  10. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  11. Changes to the Reporting Requirements for Contracts Funded by the American Recovery and Investment Act of 2009 (Recovery Act)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The reporting requirements for contracts funded by the Recovery Act at Federal Acquisition Regulation (FAR) 52.204-1 1 have been changed. The reporting requirements now require first tier subcontractors to provide jobs information to the prime contractor for reporting into www.FederalReporting.gov. While the clause applicability is for all new solicitations and contracts issued on or after July 2,201 0, reporting of subcontractor job information is beneficial to the transparency of Recovery Act programs and Contracting Officers are asked to incorporate the revised clause into contracts funded by the Recovery Act as soon as practicable. In addition, contractors should be informed of the change and asked to submit this information for the reports due this month, if possible.

  12. Report on the Depth Requirements for a Massive Detector at Homestake

    SciTech Connect (OSTI)

    Bernstein,A.; Blucher, E.; Cline, D. B.; Diwan, M. V.; Fleming, b.; Kadel, R.; Kearns, E.; Klein, J.; Lande, K.; Lanni, F.; Lissauer, D.; McKeown, R.; Morse, W.; Radeika, R.; Scholberg, K.; Smy, M.; Sobel, H.; Sullivan, G.; Svoboda, R.; Vagins, M.; Walter, C.; Zwaska, R.

    2008-12-22

    This report provides the technical justification for locating a large detector underground in a US based Deep Underground Science and Engineering Laboratory. A large detector with a fiducial mass greater than 100 kTon will most likely be a multipurpose facility. The main physics justification for such a device is detection of accelerator generated neutrinos, nucleon decay, and natural sources of neutrinos such as solar, atmospheric and supernova neutrinos. The requirement on the depth of this detector will be guided by the rate of signals from these sources and the rate of backgrounds from cosmic rays over a very wide range of energies (from solar neutrino energies of 5 MeV to high energies in the range of tens of GeV). For the present report, we have examined the depth requirement for a large water Cherenkov detector and a liquid argon time projection chamber. There has been extensive previous experience with underground water Cherenkov detectors such as IMB, Kamioka, and most recently, Super-Kamiokande which has a fiducial mass of 22 kTon and a total mass of 50 kTon at a depth of 2700 meters-water-equivalent. Projections for signal and background capability for a larger and deeper (or shallower) detectors of this type can be scaled from these previous detectors. The liquid argon time projection chamber has the advantage of being a very fine-grained tracking detector, which provides enhanced capability for background rejection. In the current work we have taken the approach that the depth should be sufficient to suppress the cosmogenic background below predicted signal rates for either of the above two technologies. Nevertheless, it is also clear that the underground facility that we are examining must have a long life and will most likely be used either for future novel uses of the currently planned detectors or new technologies. Therefore the depth requirement also needs to be made on the basis of sound judgment regarding possible future use. In particular, the

  13. Report on the Depth Requirements for a Massive Detector at Homestake

    SciTech Connect (OSTI)

    Kadel, Richard W.; Bernstein, Adam; Blucher, Edward; Cline, David B.; Diwan, Milind V.; Fleming, Bonnie; Kearns, Edward; Klein, Joshua; Lande, Kenneth; Lanni, Francesco; Lissauer, David; McKeown, Robert; Morse, William; Rameika, Regina; Scholberg, Kate; Smy, Michael; Sobel, Henry; Sullivan, Gregory; Svoboda, Robert; Vagins, Mark; Walter, Christopher; Zwaska, Robert

    2008-12-23

    This report provides the technical justification for locating a large detector underground in a US based Deep Underground Science and Engineering Laboratory. A large detector with a fiducial mass greater than 100 kTon will most likely be a multipurpose facility. The main physics justification for such a device is detection of accelerator generated neutrinos, nucleon decay, and natural sources of neutrinos such as solar, atmospheric and supernova neutrinos. The requirement on the depth of this detector will be guided by the rate of signals from these sources and the rate of backgrounds from cosmic rays over a very wide range of energies (from solar neutrino energies of 5 MeV to high energies in the range of hundreds of GeV). For the present report, we have examined the depth requirement for a large water Cherenkov detector and a liquid argon time projection chamber. There has been extensive previous experience with underground water Cherenkov detectors such as IMB, Kamioka, and most recently, Super-Kamiokande which has a fiducial mass of 22 kTon and a total mass of 50 kTon at a depth of 2700 meters-water-equivalent in a mountain. Projections for signal and background capability for a larger and deeper(or shallower) detectors of this type can be scaled from these previous detectors. The liquid argon time projection chamber has the advantage of being a very fine-grained tracking detector, which should provide enhanced capability for background rejection. We have based background rejection on reasonable estimates of track and energy resolution, and in some cases scaled background rates from measurements in water. In the current work we have taken the approach that the depth should be sufficient to suppress the cosmogenic background below predicted signal rates for either of the above two technologies. Nevertheless, it is also clear that the underground facility that we are examining must have a long life and will most likely be used either for future novel uses of the

  14. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair B.

    2012-01-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

  15. Step 5: Operations and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  16. Maintenance study for W-340 Waste Retrieval System

    SciTech Connect (OSTI)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System.

  17. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintaining Your Air Conditioner Maintaining Your Air Conditioner Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of ©iStockphoto/firemanYU. An air conditioner's filters, coils, and fins require regular maintenance for the unit to function effectively and efficiently throughout its years of service. Neglecting necessary

  18. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VEHICLE TECHNOLOGIES OFFICE WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials February 2013 FINAL REPORT This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

  19. Color Maintenance of LEDs in Laboratory and Field Applications (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Color Maintenance of LEDs in Laboratory and Field Applications Citation Details In-Document Search Title: Color Maintenance of LEDs in Laboratory and Field Applications Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is

  20. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  1. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  2. ASC Computational Environment (ACE) requirements version 8.0 final report.

    SciTech Connect (OSTI)

    Larzelere, Alex R. (Exagrid Engineering, Alexandria, VA); Sturtevant, Judith E.

    2006-11-01

    A decision was made early in the Tri-Lab Usage Model process, that the collection of the user requirements be separated from the document describing capabilities of the user environment. The purpose in developing the requirements as a separate document was to allow the requirements to take on a higher-level view of user requirements for ASC platforms in general. In other words, a separate ASC user requirement document could capture requirements in a way that was not focused on ''how'' the requirements would be fulfilled. The intent of doing this was to create a set of user requirements that were not linked to any particular computational platform. The idea was that user requirements would endure from one ASC platform user environment to another. The hope was that capturing the requirements in this way would assist in creating stable user environments even though the particular platforms would be evolving and changing. In order to clearly make the separation, the Tri-lab S&CS program decided to create a new title for the requirements. The user requirements became known as the ASC Computational Environment (ACE) Requirements.

  3. Compliance with Section 15 12 Reporting Requirements of the American Recovery and Reinvestment Act of 2009 (ARRA)

    Broader source: Energy.gov [DOE]

    Compliance with the reporting requirements of Section 15 12 is a main focus of post-award activities for awards funded by ARRA. The Recovery Operations Group of the Office of Performance Analysis and Evaluation in the Office of the Chief Financial Officer has been tracking compliance with the reporting requirement for DOE. They developed the attached list of contractors and recipients that have failed to report. Most of those not reporting are recipients receiving money from the Office of Energy Efficiency and Renewable Energy. Contracting Officers are asked to review the attached list for Contractors/Recipients under their cognizance and to send a letter to the requesting their attention, explanation and compliance. Draft templates of letters for a single or double non-compliance are attached. As the next reporting period is from April 1 to April 10,2010, Contracting Officers are requested to send the letter before April 1.

  4. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

    We would like to inform the OpenEI community that OpenEI will be...

  5. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  6. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  7. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  8. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    SciTech Connect (OSTI)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  9. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  10. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, ...

  11. Operations and Maintenance in Federal Facilities | Department...

    Office of Environmental Management (EM)

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as ...

  12. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 2001

    SciTech Connect (OSTI)

    Margorie Stockton

    2003-04-01

    Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2001, the Technical Area 3 steam plant was the primary source of criteria air pollutants from the Laboratory, while research and development activities were the primary source of volatile organic compounds. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions from chemical use for research and development activities were also reported.

  13. Gas characterization system operation, maintenance, and calibration plan

    SciTech Connect (OSTI)

    Tate, D.D.

    1996-03-04

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations.

  14. Implications of Export/Import Reporting Requirements in the United States - International Atomic Energy Agency Safeguards Additional Protocol

    SciTech Connect (OSTI)

    Killinger, Mark H.; Benjamin, Eugene L.; McNair, Gary W.

    2001-02-20

    The United States has signed but not ratified the US/IAEA Safeguards Additional Protocol. If ratified, the Additional Protocol will require the US to report to the IAEA certain nuclear-related exports and imports to the IAEA. This document identifies and assesses the issues associated with the US making those reports. For example, some regulatory changes appear to be necessary. The document also attempts to predict the impact on the DOE Complex by assessing the historical flow of exports and imports that would be reportable if the Additional Protocol were in force.

  15. Hanford.gov Site Maintenance - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page | Text Increase Font Size ...

  16. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  17. Audit Report: ER-B-99-07 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Audit Report: ER-B-99-07 May 4, 1999 Maintenance Activities at the Y-12 Plant Department of Energy (Department) policy requires the use of performance measures to assess the...

  18. Westinghouse Hanford Job Control System: Integration of preventive maintenance systems into a job control system

    SciTech Connect (OSTI)

    Hayenga, J.L.; Longwell, T.C.

    1989-10-01

    The goal of a maintenance program is to assure equipment is available to function as required. To meet this goal corrective maintenance (CM) and preventive maintenance (PM) programs are essential, and both should be considered when evaluating a maintenance program. Work control is the tool used to effectively control CM and PM. We will consider reasons that Corrective and Preventive Maintenance programs should be integrated. How the 200 Area Preventive Maintenance program is being integrated into the Job Control System (JCS), and problems posed by an operation like Hanford which is large scale in terms of geography, number of components and number of independently run plants.

  19. IT Reporting Format and Requirements for the BY 2017 Budget Submission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications DOE BY 2017 IT Reporting Instructions Major IT Business BY16 DOE IT CPIC GuideFinal DOE Guide to IT Capital Planning and Investment Control BY 2016

  20. Energy requirements for metals production: comparison between ocean nodules and land-based resources. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-09-01

    A methodology was developed to compare the energy requirements of technologies for production of metals from ocean nodules with production of same metals from land based ores using conventional processes. The energy requirements for production of copper, nickel, cobalt, and manganese from ocean nodules are based on an ocean mining operation of 3 million tons per year of dry nodules. A linear relationship exists between the amount of nodules processed and the total energy so that the energy can be easily converted to other processing rates if desired.

  1. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives ...

  2. Assessment of energy requirements in proven and new copper processes. Final report

    SciTech Connect (OSTI)

    Pitt, C.H.; Wadsworth, M.E.

    1980-12-31

    Energy requirements are presented for thirteen pyrometallurgical and eight hydrometallurgical processes for the production of copper. Front end processing, mining, mineral processing, gas cleaning, and acid plant as well as mass balances are included. Conventional reverberatory smelting is used as a basis for comparison. Recommendations for needed process research in copper production are presented.

  3. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  4. Upcoming BPAT Systems Maintenance Events

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upcoming-BPAT-Systems-Maintenance-Events Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer...

  5. US Department of Energy - Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Howdy fellow energy adventurer Energy.gov is currently undergoing routine maintenance that will make it even more awesome. Please try again in a few minutes. We...

  6. Tim Kuneli, Electronics Maintenance Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

  7. Enhanced human performance of utility maintenance programs

    SciTech Connect (OSTI)

    Fresco, A.; Haber, S.; O`Brien, J.

    1993-08-01

    Assuring the safe operation of a nuclear power plant depends, to a large extent, on how effectively one understands and manages the aging-related degradation that occurs in structures, systems, and components (SSCs). Aging-related degradation is typically managed through a nuclear plant`s maintenance program. A review of 44 Maintenance Team Inspection (MTI) Reports indicated that while some plant organizations appeared to assume a proactive mode in preventing aging-related failures of their SSCs important to safety, others seemed to be taking a passive or reactive mode. Across all plants, what is clearly needed, is a strong recognition of the importance of aging-related degradation and the use of existing organizational assets to effectively detect and mitigate those effects. Many of those assets can be enhanced by the consideration of organizational and management factors necessary for the implementation of an effective aging management program. This report provides a discussion of this program.

  8. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 1997

    SciTech Connect (OSTI)

    1999-01-01

    Los Alamos National Laboratory (the Laboratory) is subject to emissions reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73, (20 NMAC 2.73), Notice of Intent and Emissions Inventory Requirements. The Laboratory has the potential to emit 100 tons per year of suspended particulate matter (PM), nitrogen oxides (NO{sub x}), carbon monoxide (CO), and volatile organic compounds (VOCs). For 1997, combustion products from the industrial sources contributed the greatest amount of regulated air emissions from the Laboratory. Research and development activities contributed the greatest amount of VOCs. Emissions of beryllium and aluminum were reported for activities permitted under 20 NMAC 2.72, Construction Permits.

  9. Emissions Inventory Report Summary Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 1998

    SciTech Connect (OSTI)

    Air Quality Group, ESH-17

    1999-09-01

    Los Alamos National Laboratory (the Laboratory) is subject to emissions reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20 NMAC 2.73), Notice of Intent and Emissions Inventory Requirements. The Laboratory has the potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, and volatile organic compounds. For 1998, combustion products from the industrial sources contributed the greatest amount of criteria air pollutants from the Laboratory. Research and development activities contributed the greatest amount of volatile organic compounds. Emissions of beryllium and aluminum were reported for activities permitted under 20 NMAC 2.72 Construction Permits.

  10. Microsoft Word - S07566_Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  11. Evaluation of technology modifications required to apply clean coal technologies in Russian utilities. Final report

    SciTech Connect (OSTI)

    1995-12-01

    The report describes the following: overview of the Russian power industry; electric power equipment of Russia; power industry development forecast for Russia; clean coal technology demonstration program of the US Department of Energy; reduction of coal TPS (thermal power station) environmental impacts in Russia; and base options of advanced coal thermal power plants. Terms of the application of clean coal technology at Russian TPS are discussed in the Conclusions.

  12. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2016 DOCKETS |

    Energy Savers [EERE]

    SEET Decrease in Transit Subsidy SEET Decrease in Transit Subsidy Information regarding the decrease in the transit subsidy effective January 1, 2014. SEET - Decrease in the Transit Subsidy (76.21 KB) Responsible Contacts Lynn Proctor HUMAN RESOURCES SPECIALIST E-mail lynn.proctor@hq.doe.gov Phone 202-586-9545 More Documents & Publications Ridefinders Application DOE HQ F 3780.2 Workplace Charging Challenge Summit 2014: Session 1, Track B

    SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT

  13. CB-EMIS MAINTENANCE MONITORING SYSTEM

    Energy Science and Technology Software Center (OSTI)

    2006-10-01

    This system continuously monitors all components of a CB-EMIS (ANL-02-078)installation such as signals for video cameras, detector, train data, meteorological data, computer and network equipment and reports exceptions to maintenance staff so that corrections can be made as soon as possible. This monitoring system is built within Nagios (www.nagios.org), a free open source host service and network monitoring program.

  14. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20.2.73 NMAC) for Calendar Year 2003

    SciTech Connect (OSTI)

    M. Stockton

    2005-01-01

    Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2003, the Technical Area 3 steam plant and the air curtain destructors were the primary sources of criteria air pollutants from the Laboratory, while the air curtain destructors and chemical use associated with research and development activities were the primary sources of volatile organic compounds and hazardous air pollutants. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions were reported from chemical use as well as from all combustion sources. In addition, estimates of particulate matter with diameter less than 2.5 micrometers and ammonia were provided as requested by the New Mexico Environment Department, Air Quality Bureau.

  15. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    SciTech Connect (OSTI)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview of the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.

  16. Reliability centered maintenance (RCM) for substations project overview

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

  17. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  18. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE REporting requirements_presentations_4-29-14.ppt [Compatibility M

    National Nuclear Security Administration (NNSA)

    Overview of DOE and NRC Reporting to NMMSS Similarities, Differences, and Challenges John Ballard, DOE Reconciliation Mary McConnell, NRC Reconciliation LINK Technologies Reporting to NMMSS Regulatory Compliance DOE Reporting Requirements NRC Reporting Requirements Resources 2 Regulatory Compliance DOE regulatory questions? - Contact Pete Dessaules DOE NMMSS Program Manager 301-903-4525 pete.dessaules@nnsa.doe.gov NRC regulatory questions? - Contact Brian Horn NRC NMMSS Program Manager

  19. Maintenance Practices for LED Streetlights

    Office of Energy Efficiency and Renewable Energy (EERE)

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  20. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  1. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  2. Spring Home Maintenance: Windows, Windows, Windows! | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spring Home Maintenance: Windows, Windows, Windows Spring Home Maintenance: Windows, Windows, Windows April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air ...

  3. FAQS Reference Guide - Facility Maintenance Management | Department...

    Broader source: Energy.gov (indexed) [DOE]

    are developed to assist operators, maintenance personnel, and the technical staff in ... (STD)-1181-2014, Facility Maintenance Management Functional Area Qualification Standard. ...

  4. Preventive Maintenance Strategies for Compressed Air Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Suggested Actions * Establish a regular, well-organized maintenance program in accordance ... that all compressed air system maintenance needs are performed properly, on ...

  5. Efficiency Lighting & Maintenance Inc | Open Energy Information

    Open Energy Info (EERE)

    & Maintenance Inc Jump to: navigation, search Name: Efficiency Lighting & Maintenance Inc Address: 5a Del Mar Drive Place: Brookfield, Connecticut Zip: 06804 Region: Northeast - NY...

  6. Geothermal Data Development, Collection, and Maintenance | Open...

    Open Energy Info (EERE)

    Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading...

  7. Maintenance Planner | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance Planner Department: Facilities Requisition Number: 1501075 Position Summary: This multi-trade Maintenance Planner position will enhance the Lab's Facilities Division...

  8. Oregon Department of Transportation - Maintenance and Operations...

    Open Energy Info (EERE)

    Maintenance and Operations Branch Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Department of Transportation - Maintenance and Operations...

  9. Guidance, Reports, and Documents | Department of Energy

    Office of Environmental Management (EM)

    documents, and regulatory drivers for long-term surveillance and maintenance activities. ... for Long-Term Surveillance and Maintenance Title I Disposal Sites Annual Report ...

  10. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  11. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  13. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  14. Fossil-fuel power plants: Computer systems for power plant control, maintenance, and operation. October 1976-December 1989 (A Bibliography from the COMPENDEX data base). Report for October 1976-December 1989

    SciTech Connect (OSTI)

    Not Available

    1990-02-01

    This bibliography contains citations concerning fossil-fuel power plant computer systems. Minicomputer and microcomputer systems used for monitoring, process control, performance calculations, alarming, and administrative applications are discussed. Topics emphasize power plant control, maintenance and operation. (Contains 240 citations fully indexed and including a title list.)

  15. Operations and Maintenance Manual for Large Aperture Scanner System

    SciTech Connect (OSTI)

    Jones, Anthony M.; Hall, Thomas E.

    2010-04-08

    Operations and maintenance manual includes detailed instructions for system assembly, use, and maintenance.

  16. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  17. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    SciTech Connect (OSTI)

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  18. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  19. Drive alignment pays maintenance dividends

    SciTech Connect (OSTI)

    Fedder, R.

    2008-12-15

    Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

  20. Orifice-type condensate removal device reduces maintenance, energy costs

    SciTech Connect (OSTI)

    Wright, T.N.; Isaacs, M.

    1983-02-01

    In the acrylate section of the Rohm and Haas Texas plant in Deer Park, conventional steam traps were replaced by a potential orifice-type condensate removal device that has no moving parts or gaskets. Each of the devices installed resulted in a saving of an estimated $2000/year by eliminating the maintenance required on the original steam traps.

  1. Maintenance implementation plan for the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Boyd, J.A.

    1997-01-30

    This plan implements the U.S. Department of Energy (DOE) 4330.4B, Maintenance Management Program (1994), at the Fast Flux Test Facility (FFTF). The FFTF is a research and test reactor located near Richland, Washington, and is operated under contract for the DOE by the B&W Hanford Company (BWHC). The intent of this Maintenance Implementation Plan (MIP) is to describe the manner in which the activities of the maintenance function are executed and controlled at the FFTF and how this compares to the requirements of DOE 4330.4B. The MIP ii a living document that is updated through a Facility Maintenance Self- Assessment Program. During the continuing self-assessment program, any discrepancies found are resolved to meet DOE 4330.4B requirements and existing practices. The philosophy of maintenance management at the FFTF is also describe within this MIP. This MIP has been developed based on information obtained from various sources including the following: * A continuing self-assessment against the requirements of the Conduct of Maintenance Order * In-depth reviews conducted by the members of the task team that assembled this MIP * Inputs from routine audits and appraisals conducted at the facility The information from these sources is used to identify those areas in which improvements could be made in the manner in which the facility conducts maintenance activities. The action items identified in Rev. 1 of the MIP have been completed. The MIP is arranged in six sections. Section I is this Executive Summary. Section 2 describes the facility and its 0683 history. Section 3 describes the philosophy of the graded approach and how it is applied at FFTF. Section 3 also discusses the strategy and the basis for the prioritizing resources. Section 4 contains the detailed discussion of `the elements of DOE 4330.4B and their state of implementation. Section 5 is for waivers and requested deviations from the requirements of the order. Section 6 contains a copy of the Maintenance

  2. Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the U.S. Code of Federal Regulations as codified on December 31, 1993; Revision 1

    SciTech Connect (OSTI)

    Collins, M.; Shelton, B.

    1994-07-01

    This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the code of Federal Regulations, Chapter 1, on December 31, 1993. It also includes, in a separate section, any of those requirements that were superseded or discontinued between January 1992 and December 1993. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation. The Office of Information Resources Management staff compiled this listing of reporting and recordkeeping requirements to briefly describe each in a single document primarily to help licensees readily identify the requirements. The compilation is not a substitute for the regulations, and is not intended to impose any new requirements or technical positions. It is part of NRC`s continuing efforts to comply with the Paperwork Reduction Act of 1980 and the Office of Management and Budget regulations that mandate effective and efficient Federal information resources management programs.

  3. Operations and Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Operations and Maintenance Operations and Maintenance Photo of a man, wearing a yellow hard hat, looking at a wall with panels and wires mounted to it. Lower ...

  4. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming...

  5. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Reliability centered maintenance (RCM) products - future

    SciTech Connect (OSTI)

    Lyons, P.F.

    1996-08-01

    This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

  8. CRAD, Maintenance Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to

  9. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  2. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  3. Title II Disposal Sites Annual Report

    Broader source: Energy.gov [DOE]

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2015 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements.

  4. Evaluation of urban storm-water maintenance in North Carolina

    SciTech Connect (OSTI)

    Roenigk, D.J.; Paterson, R.G.; Heraty, M.A.; Kaiser, E.J.; Burby, R.J.

    1992-06-01

    Spurred by continuing urban growth and new federal mandates for control of nonpoint source pollution, local governments are increasingly concerned about the need to improve stormwater management. Long-term maintenance is a critical aspect of stormwater management if both water quality and water quantity benefits are to be realized in practice. The report examines what is actually being done in North Carolina cities to maintain stormwater systems and what selected stormwater experts feel should be done. Several actions are needed. First, local governments are recommended to pay greater attention to system planning, apply more stringent design standards, and monitor the effectiveness of structures protecting water quality as the most critical basis for successful long-term maintenance. Second, policy makers at all levels of government and researchers need to determine appropriate strategies for the treatment and disposal of accumulated sediments. Finally, further research about the best maintenance practices and financing arrangements may be needed.

  5. Guidance on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EECBG PROGRAM NOTICE 11-003 EFFECTIVE DATE: NOVEMBER 1, 2011 SUBJECT: GUIDANCE ON THE REQUIRED PERIOD FOR GRANTEES TO OBLIGATE FUNDS AND THE PROCEDURES FOR REPORTING OF OBLIGATED FUNDS FOR THE ENERGY EFFICIENCY CONSERVATION BLOCK GRANT PROGRAM (EECBG) PURPOSE To provide guidance and clarify the required period for obligation of funds as established in the Energy Efciency Conservation Block Grant (EECBG) Program Funding Opportunit Announcements (FOAs) Number DE-FOA-0000013 and DE-FOA-0000148, and

  6. Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair

    SciTech Connect (OSTI)

    Not Available

    1983-12-30

    This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations.

  7. Plant maintenance and advanced reactors, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2007-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: A new day for energy in America; Committed to success more than ever, by Andy White, GE--Hitachi Nuclear Energy; Competitive technology for decades, by Steve Tritch, Westinghouse Electric Company; Pioneers of positive community relationship, by Exelon Nuclear; A robust design for 60-years, by Ray Ganthner, Areva; Aiming at no evacuation plants, by Kumiaki Moriya, Hitachi-GE Nuclear Energy, Ltd.; and, Desalination and hydrogen economy, by Dr. I. Khamis, International Atomic Energy Agency. Industry innovation articles in this issue are: Reactor vessel closure head project, by Jeff LeClair, Prairie Island Nuclear Generating Plant; and Submersible remote-operated vehicle, by Michael S. Rose, Entergy's Fitzpatrick Nuclear Station.

  8. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-09

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Admin Chg 1, dated 6-14-13, supersedes DOE G 433.1-1A.

  9. Operation and maintenance manual for the LDUA operations control trailer (LDUA System 4100)

    SciTech Connect (OSTI)

    Clark, D.A.

    1996-09-10

    The Light Duty Utility Arm (LDUA) Operations Control Trailer(OCT) has completed testing and is ready for operation. This document defines the requirements applicable to the operation and maintenance of the OCT.

  10. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  11. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-12

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Cancels DOE G 433.1-1.

  12. High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment corrective actions/compliance schedule approval report

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1996-09-30

    This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.

  13. No maintenance -- no energy efficiency

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

    1994-12-01

    Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

  14. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    SciTech Connect (OSTI)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  15. Science Requirements Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  16. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  17. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  18. Guidance on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program

    Broader source: Energy.gov [DOE]

    This document provides guidance and clarifies the required period for obligation of funds as established in the Energy Efficiency Conservation Block Grant (EECBG) Program Funding Opportunity Announcements (FOAs) Number DE-FOA-0000013 and DE-FOA-0000148, and to clarify the procedures for the reporting of funds obligated by the grantees.

  19. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

  20. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  1. Establishing a reliable source of fuel for Department of Defense requirements: Effective petroleum, oil, and lubricant financial managment. Final report

    SciTech Connect (OSTI)

    Scherer, T.F.

    1981-12-01

    The Defense Fuel Supply Center (DFSC) is the management and procurement agency for petroleum for the Department of Defense. Its mission is to procure refined petroleum products to meet military service requirements worldwide and federal requirements within the United States. The procurement options analyzed are divided into two categories -- direct and indirect methods of acquiring products. Through the analysis discussed, it will be shown that the only viable solution to DFSC's problem lies in purchasing the desired quantities using direct acquisition methods by reducing the cost incurred to a refiner for supplying military products.

  2. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  3. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  4. Improve Operations & Maintenance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Every building's energy consumption can benefit from rigorous operations and maintenance ... for improvement, and implement low-cost changes to reduce energy consumption. ...

  5. Permit applicants' guidance manual for exposure information requirements under RCRA (Resource Conservation and Recovery Act) Section 3019. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-07-03

    The purpose of this document is to provide owners and operators of hazardous-waste landfills and surface impoundments that are subject to permitting under the Resource Conservation and Recovery Act (RCRA) with guidance for submitting information on the potential for public exposure to hazardous wastes, as required by Section 3019 of RCRA.

  6. Report of the Task Group on operation Department of Energy tritium facilities

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    This report discusses the following topics on the operation of DOE Tritium facilities: Environment, Safety, and Health Aspects of Tritium; Management of Operations and Maintenance Functions; Safe Shutdown of Tritium Facilities; Management of the Facility Safety Envelope; Maintenance of Qualified Tritium Handling Personnel; DOE Tritium Management Strategy; Radiological Control Philosophy; Implementation of DOE Requirements; Management of Tritium Residues; Inconsistent Application of Requirements for Measurement of Tritium Effluents; Interdependence of Tritium Facilities; Technical Communication among Facilities; Incorporation of Confinement Technologies into New Facilities; Operation/Management Requirements for New Tritium Facilities; and Safety Management Issues at Department of Energy Tritium Facilities.

  7. Plant maintenance and advanced reactors issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

  8. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping

    SciTech Connect (OSTI)

    Not Available

    1985-04-01

    This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

  9. Nuclear Energy Research Initiative. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report

    SciTech Connect (OSTI)

    Ritterbusch, S.E.

    2000-08-01

    The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-informed approach for the design and regulation of nuclear power plants. This approach will include the development and.lor confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRs) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go farther by focusing on the design of new plants.

  10. Report on the activities of the ASME-NQA Committee Working Group on Quality Assurance Requirements for Research and Development, April 1990 to August 1991

    SciTech Connect (OSTI)

    Dronkers, J.J.

    1991-09-01

    This report transmits to the public eye the activities of the American Society of Mechanical Engineers-Nuclear Quality Assurance (ASME-NQA) Committee Working Group on Quality Assurance Requirements for Research and Development. The appendix lists the members of this group as of August 1991. The report covers a period of 17 months. The working group met eight times in this period, and much intellectual ground was traversed. There was seldom agreement on the nature of the task, but there was no doubt as to its urgency. The task was how to adapt the nuclear quality assurance standard, the NQA-1, to research and development work. 1 fig., 7 tabs.

  11. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  12. From Cleanup to Stewardship. A companion report to Accelerating Cleanup: Paths to Closure and background information to support the scoping process required for the 1998 PEIS Settlement Study

    SciTech Connect (OSTI)

    1999-10-01

    Long-term stewardship is expected to be needed at more than 100 DOE sites after DOE's Environmental Management program completes disposal, stabilization, and restoration operations to address waste and contamination resulting from nuclear research and nuclear weapons production conducted over the past 50 years. From Cleanup to stewardship provides background information on the Department of Energy (DOE) long-term stewardship obligations and activities. This document begins to examine the transition from cleanup to long-term stewardship, and it fulfills the Secretary's commitment to the President in the 1999 Performance Agreement to provide a companion report to the Department's Accelerating Cleanup: Paths to Closure report. It also provides background information to support the scoping process required for a study on long-term stewardship required by a 1998 Settlement Agreement.

  13. Spares management for improved maintenance

    SciTech Connect (OSTI)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the US Nuclear Regulatory Commission (NRC) of maintenance practices at US nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants, and that 57% of the plants sometimes operated in a limiting condition for operation over the last year due to unavailability of spare parts. That's the bad news. The good news is that significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Inventory Solutions of Akron, Ohio, has developed such a tool, called rarely used inventory stocking logic (RUSL) which is a user-friendly decision support tool for setting spare parts reorder points. Based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat readiness, RUSL calculates the optimum stocking level to achieve the desired spare part availability at the station. In doing so, it considers the importance of the part in preventing an outage, as well as key economic ordering parameters, such as part cost, carrying cost, number of parts in service, historical observed usage, anticipated future usage, and lead time to replenish.

  14. System requirements specification for a solar central receiver system integrated with a cogeneration facility for copper smelting. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-08-01

    This specification defines the characteristics, design and environmental requirements, and economic data for a solar central receiver system integrated with a cogeneration facility for copper smelting. The added solar capacity will supply process heat to an existing copper smelting flash furnace of Finnish design as well as providing for the cogeneration of electricity by an added gas turbine system. Heat storage to accommodate periods of low solar insolation is accomplished by the innovative utilization of copper slag in a thermal energy storage system. This specification is limited (1) to those portions of the plant to be added or modified in order to accomplish the proposed solar retrofit, and (2) by the conceptual design nature of the contracted study. Section 1 of this specification describes the proposed modifications to existing site conditions and facilities, and the nomenclature used. Section 2 provides a listing of applicable standards and codes, publications, reference documentation, and regulatory information. Design and performance requirements to be met by this solar cogeneration facility are outlined in Section 3, and the environmental criteria applicable to the plant are addressed in Section 4. The solar cogeneration facility's characteristics and performance data are specified in Section 5, along with the plant cost and economic data. Simulation models are also described. Appendix B presents site facility information; Appendix C covers the determination of the physical and chemical properties of copper smelter slag; Appendix D presents estimating backup sheets.

  15. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FACILITIES | Department of Energy 3.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This module is divided into three sections. Section one contains the objective, general requirements, and the

  16. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  17. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  18. Identification of the Spawning, Rearing and Migratory Requirements of Fall Chinook Salmon in the Columbia River Basin, Annual Report 1992.

    SciTech Connect (OSTI)

    Rondorf, Dennis W.; Miller, William H.

    1994-03-01

    This document is the 1992 annual progress report for selected studies of fall chinook Salmon Oncorhynchus tshawytscha conducted by the National Biological Survey (NBS) and the US Fish and Wildlife Service. The decline in abundance of fall chinook salmon in the Snake River basin has become a growing concern. Effective recovery efforts for fall chinook salmon cannot be developed until we increase our knowledge of the factors that are limiting the various life history stages. This study attempts to identify those physical and biological factors which influence spawning of fall chinook salmon in the free-flowing Snake River and their rearing and seaward migration through Columbia River basin reservoirs.

  19. Contract to coordinate on-going documentation requirements associated with Title X legislation for DOE active-solar activities. Final project technical report

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The objectives of this work were to ensure that Title X Active Solar Program reports complied with all guidance regarding length, format, coverage, tone, tables and schedules; provide necessary Conservation and Renewable Energy Office background and back-up material; follow this activity through to its completion in January 1982; assess information requirements associated with on-going documentation of Federal Buildings Program and its predecessors; establish a method for collecting, maintaining and utilizing appropriate program data specifically related to the preparation of report due in June 1982. Work on this project has generally remained on schedule and within budget. DOE-SAN has been instrumental in keeping us on track, by providing timely guidance as needed. Attached are recommendations and methods for documenting solar heat technologies research and the Title X sunset policy, planning, and evaluation long report for Active Solar Heating and Cooling Program.

  20. SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 1. System requirement definition and system analysis

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    Catalytic Inc. was awarded a contract to conduct a preliminary system design and cost analysis for a brackish water desalination project to be located in Brownsville, Texas. System analyses and economic analyses were performed to define the baseline solar energy desalination system. The baseline system provides an average daily product water capacity of 6000 mT. The baseline system is optimal relative to technological risk, performance, and product water cost. Subsystems and their interfaces have been defined and product water cost projections made for commercial plants in a range of capacities. Science Applications, Inc. (SAI), subcontractor to Catalytic, had responsibility for the solar power system. This, the final report, summarizes the work performed under the Phase I effort.

  1. Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operated in Steady-State Conditions | Department of Energy Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions (42 pages, December 2014) (2.29 MB) More Documents & Publications Report 20.5: Chromaticity Shift Modes

  2. Major NERSC Maintenance Tuesday November 11

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major NERSC Maintenance Tuesday November 11 Major NERSC Maintenance Tuesday November 11 October 31, 2014 by Francesca Verdier There will be a major NERSC maintenance on Tuesday, November 11, from 08:00 until 18:00 PST. Several systems and services will be unavailable during this time. Edison, Hopper, Data Transfer nodes, and Science Gateway (data portal) nodes will be unavailable 08:00 - 13:00. Carver/Dirac, PDSF, and Genepool will be unavailable 08:00 - 18:00. HPSS and web servers

  3. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  4. Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find

  5. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from

  6. BPAT Systems Maintenance - December 12, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 12122014 BPAT's e-Tag and OASIS software vendor will be performing a...

  7. BPAT Systems Maintenance - November 5, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 1152014 BPAT's e-Tag and OASIS software vendor will be performing a...

  8. BPAT Systems Maintenance - February 9, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 292015 BPAT's e-Tag and OASIS software vendor will be performing a...

  9. BPAT Systems Maintenance - March 6, 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: BPAT Systems Maintenance Posted Date: 362015 BPAT's e-Tag and OASIS software vendor will be performing a...

  10. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  11. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  12. Advanced Remote Maintenance Design for Pilot-Scale Centrifugal...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Advanced Remote Maintenance Design for Pilot-Scale Centrifugal Contactors Citation Details In-Document Search Title: Advanced Remote Maintenance Design for ...

  13. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area ... EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western ...

  14. FY 2014 Real Property Data Related to Operations and Maintenance...

    Energy Savers [EERE]

    Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperationsandM...

  15. Subject: Ames Blue Alert - X-ray Shutter Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ames Blue Alert - X-ray Shutter Maintenance Statement: This lesson learned involves an ... 4. Follow the manufacturers suggested maintenance schedule. 5. Follow the standard ...

  16. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Broader source: Energy.gov (indexed) [DOE]

    for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance (943.69 KB) More Documents & Publications Site Transition Framework ...

  17. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Energy Savers [EERE]

    1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the ...

  18. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He There will be a ...

  19. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...

    Broader source: Energy.gov (indexed) [DOE]

    of records relating to space and maintenance, except as indicated below. ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS (10.49 KB) More Documents & ...

  20. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Prestige award ...

  1. Decision Support for Operations and Maintenance (DSOM) - Energy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Decision Support for Operations and Maintenance (DSOM) Pacific Northwest National ... The Decision Support for Operations and Maintenance (DSOM) system is an expert ...

  2. Site Transition Framework for Long-Term Surveillance and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Framework for Long-Term Surveillance and Maintenance Site Transition Framework for Long-Term Surveillance and Maintenance The Site Transition Framework (STF) provides a framework ...

  3. How to Determine and Verify Operating and Maintenance Savings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts How to Determine and Verify Operating and Maintenance Savings in Federal ...

  4. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Energy Savers [EERE]

    Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4, 2014 - 2:40pm ...

  5. GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthines...

    Open Energy Info (EERE)

    b: Inspection and Maintenance and Roadworthiness Jump to: navigation, search Tool Summary LAUNCH TOOL Name: GIZ Sourcebook Module 4b: Inspection and Maintenance and Roadworthiness...

  6. Maintenance accountability, jobs, and inventory control (MAJIC) program

    SciTech Connect (OSTI)

    Adkisson, B P

    1990-01-01

    This document describes the operating procedures for the maintenance accountability, jobs, and inventory control (MAJIC) program for the Maintenance Management Department of the ORNL Instrumentation and Controls Division.

  7. Enterprise Assessments Assessment of Conduct of Maintenance at...

    Office of Environmental Management (EM)

    Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant June 2016 Office ... Nuclear Safety Organization NWP Nuclear Waste Partnership, LLC NMMP Nuclear Maintenance ...

  8. Innovative Application of Maintenance-Free Phase-Change Thermal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish Engine Solar Power Generation Innovative Application of Maintenance-Free Phase-Change Thermal Energy ...

  9. Enterprise Assessments Assessment of Conduct of Maintenance at...

    Energy Savers [EERE]

    Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 Enterprise Assessments Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 ...

  10. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  11. Tanker navigation safety standards: Tanker navigation safety research baseline: A study required by section 4111(b)(9) of the Oil Pollution Act of 1990. Final report

    SciTech Connect (OSTI)

    1996-12-31

    The Oil Pollution Act of 1990 directed the Secretary of Transportation to review and incorporate the results of past studies, including studies by the Coast Guard and Office of Technology Assessment (OTA). This literature search and review focuses on materials pertinent to determining or evaluating current and/or `best` practices, and not on the adequacy of current statutes or regulations. In addition, it is not the intention of the report to assess best practices (e.g., suggest the appropriate crew sizes or what navigation equipment should be required on tankers), but to establish the baseline for future study of best practices. The report does not provide answers to new analytical quations, but presents the status of research so that questions addressed previoulsy will not be duplicated by future studies.

  12. 296-B-13 stack monitoring and sampling system: Annual system assessment report

    SciTech Connect (OSTI)

    Ridge, T.M.

    1995-05-16

    This report presents the details of the annual system assessment of the air pollution monitoring and sampling system for the 296-13 stack at the Hanford site. Topics discussed include; system description, system status, system aging, spare parts considerations, long term maintenance plan, trends, and items requiring action.

  13. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J.; Abbott, P.D.; Matusheski, R.L.; Smith, S.B.

    1996-08-01

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  14. Habitat planning, maintenance and management working group

    SciTech Connect (OSTI)

    1997-03-01

    The Gulf of Mexico (GOM), called {open_quotes}America`s Sea,{close_quotes} is actually a small ocean basin covering over 1.5 million square kilometers. Because of the multiple uses, diversity, and size of the Gulf`s resources, management is shared by a number of governmental agencies including the Minerals Management Service, the Gulf of Mexico Fishery Management Council, the Gulf States Marine Fisheries Commission, National Marine Fisheries Service, the US Coast Guard, the US Army Corps of Engineers, and the five Gulf states fisheries agencies. All of these entities share a common goal of achieving optimum sustainable yield to maximize geological, biological, social, and economic benefits from these resources. These entities also share a common theme that the successful management of the northern GOM requires maintenance and enhancement of both the quantity and quality of habitats. A closer look at the GOM shows the sediment to be clearly dominated by vast sand and mud plains. These soft bottom habitats are preferred by many groundfish and shrimp species and, thus, have given rise to large commercial fisheries on these stocks. Hard bottom and reef habitats, on the other hand, are limited to approximately 1.6% of the total area of the Gulf, so that, while there are high demands by commercial and recreational fishermen for reef associated species, the availability of habitat for these stocks is limited. The thousands of oil and gas structures placed in the Gulf have added significant amounts of new hard substrate. The rigs-to-reefs concept was a common sense idea with support from environmental user groups and the petroleum industry for preserving a limited but valuable habitat type. As long as maximizing long-term benefits from the Gulf s resources for the greatest number of users remains the goal, then programs such as Rigs-to-Reefs will remain an important tool for fisheries and habitat managers in the Gulf.

  15. Microsoft PowerPoint - Final 2015 Annual Report presentation.pptx

    Office of Legacy Management (LM)

    Site, Colorado Annual Report of Site Surveillance and Maintenance Activities Calendar Year 2015 Rocky Flats Stewardship Council June 6, 2016 Quarterly Monitoring and Reporting  Quarterly reports are required under RFLMA to document that the CERCLA remedy continues to be protective * Primary goal: surface water protection  Response action under the final remedy for Rocky Flats * Maintain two landfill covers * Maintain four groundwater treatment systems * Monitor surface water and

  16. Building 9401-2 Plating Shop Surveillance and Maintenance Plan

    SciTech Connect (OSTI)

    1999-05-01

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S

  17. Performance-based inspection and maintenance strategies

    SciTech Connect (OSTI)

    Vesely, W.E.

    1995-04-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as {open_quotes}high degradation{close_quotes}, {open_quotes}moderate degradation{close_quotes}, or {open_quotes}low degradation{close_quotes}. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications.

  18. Assessment of economic impact of offshore and coastal discharge requirements on present and future operations in the Gulf of Mexico. Final report

    SciTech Connect (OSTI)

    Lindsey, R.

    1996-06-01

    The high potential costs of compliance associated with new effluent guidelines for offshore and coastal oil and gas operations could significantly affect the economics of finding, developing, and producing oil and gas in the Gulf of Mexico. This report characterizes the potential economic impacts of alternative treatment and discharge regulations for produced water on reserves and production in Gulf of Mexico coastal, territorial and outer continental shelf (OCS) waters, quantifying the impacts of both recent regulatory changes and possible more stringent requirements. The treatment technologies capable of meeting these requirements are characterized in terms of cost, performance, and applicability to coastal and offshore situations. As part of this analysis, an extensive database was constructed that includes oil and gas production forecasts by field, data on existing platforms, and the current treatment methods in place for produced water treatment and disposal on offshore facilities. This work provides the first comprehensive evaluation of the impacts of alternative regulatory requirements for produced water management and disposal in coastal and offshore areas of the Gulf of Mexico.

  19. The development and evaluation of programmatic performance indicators associated with maintenance at nuclear power plants

    SciTech Connect (OSTI)

    Wreathall, J.; Fragola, J.; Appignani, P.; Burlile, G.; Shen, Y. )

    1990-05-01

    This report summarizes the development and evaluation of programmatic performance indicators of maintenance. These indicators were selected by: (1) creating a formal framework of plant processes; (2) identifying features of plant behavior considered important to safety; (3) evaluating existing indicators against these features; and (4) performing statistical analyses for the selected indicators. The report recommends additional testing. 32 refs., 29 figs., 11 tabs.

  20. ICDF Complex Remedial Action Report

    SciTech Connect (OSTI)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  1. Safety and Health Reporting Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Cancels specific PARAGRAPHS in the following Orders: DOE O 5400.1; DOE O 5400.2A; DOE O 5400.5; DOE O 5400.1E; DOE O 5480.3; DOE O 5480.26; DOE O 5483.1A; DOE O 5484.1; DOE O 5630.12A; and DOE O 5634.1B. Please see DOE O 231.1; Paragraph 5B(2) canceled by DOE O 470.2A. Chg 2, dated 11-7-96, cancels DOE O 231.1 Chg 1. Canceled by DOE O 231.1A.

  2. Safety and Health Reporting Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Cancels specific PARAGRAPHS in the following Orders: DOE O 5400.1; DOE O 5400.2A; DOE O 5400.5; DOE O 5400.1E; DOE O 5480.3; DOE O 5480.26; DOE O 5483.1A; DOE O 5484.1; DOE O 5630.12A; and DOE O 5634.1B. Please see DOE O 231.1; Paragraph 5B(2) canceled by DOE O 470.2A. Canceled by DOE O 231.1A.

  3. Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Facility Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on

  4. Director of Maintenance for USA Jet Airlines, Inc. | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Director of Maintenance for USA Jet Airlines, Inc. Rick A. Wilson Rick Wilson July 2009 U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year Rick A. Wilson has received the U.S. General Services Administration (GSA) Aviation Maintenance Professional of the Year award. Wilson is the director of maintenance for USA Jet Airlines, Inc., in Albuquerque. He manages the maintenance activity of seven different fleet aircraft for

  5. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  6. Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Submittal Letter (pdf) Appendix A (xls) AnchoChaquehui Watershed PCB Report Polychlorinated Biphenyls in Precipitation and Stormwater within the Upper Rio Grande Watershed (pdf) ...

  7. Requirement-Reviews.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  8. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  9. Reliability centered maintenance for substation equipment

    SciTech Connect (OSTI)

    1996-08-01

    This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

  10. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  11. Technical Insights for Saltstone PA Maintenance

    SciTech Connect (OSTI)

    Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

    2011-07-20

    compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

  12. Inertial Fusion Power Plant Concept of Operations and Maintenance

    SciTech Connect (OSTI)

    Anklam, T.; Knutson, B.; Dunne, A. M.; Kasper, J.; Sheehan, T.; Lang, D.; Roberts, V.; Mau, D.

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  13. Down-regulation of Rab5 decreases characteristics associated with maintenance of cell transformation

    SciTech Connect (OSTI)

    Silva, Patricio; Soto, Nicolás; Díaz, Jorge; Mendoza, Pablo; Díaz, Natalia; Quest, Andrew F.G.; Torres, Vicente A.

    2015-08-21

    The early endosomal protein Rab5 is highly expressed in tumor samples, although a causal relationship between Rab5 expression and cell transformation has not been established. Here, we report the functional effects of targeting endogenous Rab5 with specific shRNA sequences in different tumor cell lines. Rab5 down-regulation in B16-F10 cells decreased tumor formation by subcutaneous injection into C57/BL6 mice. Accordingly, Rab5 targeting in B16-F10 and A549, but not MDA-MB-231 cells was followed by decreased cell proliferation, increased apoptosis and decreased anchorage-independent growth. These findings suggest that Rab5 expression is required to maintain characteristics associated with cell transformation. - Highlights: • Rab5 is important to the maintenance of cell transformation characteristics. • Down-regulation of Rab5 decreases cell proliferation and increases apoptosis in different cancer cells. • Rab5 is required for anchorage-independent growth and tumorigenicity in-vivo.

  14. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... The analogous criterion for DERs is 1.96. The overall goal for the water data set is to ... 1.96, and overall the data set should have 85 percent compliance with the criterion. ...

  15. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    A: Hydrologic Data A.1 Surface-Water Discharge Data A.1.1 GS01: Woman Creek at Indiana Street A.1.2 GS03: Walnut Creek at Indiana Street A.1.3 WOMPOC: Woman Creek at Eastern COU ...

  16. Annual Report of Site Surveillance and Maintenance Activities...

    Office of Legacy Management (LM)

    ... Mindat.org and Hudson Institute of Mineralogy, 2016. Schwartzwalder Mine (Ralston Creek Mine), Ralston Buttes District, Jefferson Co., Colorado, USA, web page http:...

  17. DOE Publishes GATEWAY Report on High-Mast Lighting at Philadelphia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Airport | Department of Energy High-Mast Lighting at Philadelphia International Airport DOE Publishes GATEWAY Report on High-Mast Lighting at Philadelphia International Airport November 10, 2015 - 5:02pm Addthis The U.S. Department of Energy's GATEWAY program has released a report on a trial installation of LED apron lighting at Philadelphia International Airport (PHL). In addition to reducing energy, PHL also hoped to reduce required maintenance, reduce light pollution, and

  18. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  19. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  20. Linac cryogenic distribution system maintenance and upgrades at JLab

    SciTech Connect (OSTI)

    Dixon, K.; Wright, M.; Ganni, V.

    2014-01-29

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  1. Linac cryogenic distribution system maintenance and upgrades at Jlab

    SciTech Connect (OSTI)

    Dixon, Kelly D.; Wright, Mathew C.; Ganni, Venkatarao

    2014-01-01

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  2. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE) ...

  3. Maintenance Guide for DOE Low-Level Waste Disposal Facility ...

    Broader source: Energy.gov (indexed) [DOE]

    Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses Maintenance Guide for DOE Low-Level Waste Disposal ...

  4. Y-12 demos former utilities and maintenance facility | National...

    National Nuclear Security Administration (NNSA)

    demos former utilities and maintenance facility Friday, September 26, 2014 - 1:05pm The ... 9744, a former utilities and maintenance facility occupying more than 9,000 square feet. ...

  5. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    SciTech Connect (OSTI)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  6. Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  7. Preventive Maintenance Strategies for Compressed Air Systems | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Preventive Maintenance Strategies for Compressed Air Systems Preventive Maintenance Strategies for Compressed Air Systems This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs. COMPRESSED AIR TIP SHEET #6 Preventive Maintenance Strategies for Compressed Air Systems (August 2004) (245.23 KB) More Documents & Publications Effect of Intake on Compressor Performance Maintaining System Air Quality

  8. Animation Requirements

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  9. DART - Desktop Analysis and Reporting Tool

    SciTech Connect (OSTI)

    Alcala, Scott A

    2013-03-27

    DART provides tools and processes for analyzing data, identifying configuration issues and hardward failures, and reporting results/findings to administrative as well as maintenance individuals.

  10. REPORT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/NV/11718-387 ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM FISCAL YEAR 1999 REPORT December 1999 Prepared by Ecological Services P.O. Box 98521 Las Vegas, NV 89193-8521 DISCLAIMER STATEMENT Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S. Government or any agency thereof or its contractors or subcontractors.

  11. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  12. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    SciTech Connect (OSTI)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.

  13. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    SciTech Connect (OSTI)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives on current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.

  14. Title III Evaluation Report for the Muck Storage

    SciTech Connect (OSTI)

    H.R. Montalvo

    1998-08-13

    The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Muck Storage System. Recommendations for resolving discrepancies between the as-constructed system, the technical baseline requirements, and the baseline design are included in this report. Cost and Schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guide lines. These recommendations are intended to improve and enhance the operation and maintenance of the facility.

  15. TITLE III EVALUATION REPORT FOR THE SUBSURFACE LIGHTING SYSTEM

    SciTech Connect (OSTI)

    L.J. Fernandez

    1998-09-09

    The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Subsurface Lighting System. Recommendations for resolving discrepancies between the as-constructed system, and the technical baseline requirements are included in this report. Cost and Schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guide lines. These recommendations are intended to improve and enhance the operation and maintenance of the facility.

  16. A survey of HVDC operating and maintenance practices and their impact on reliability and performance

    SciTech Connect (OSTI)

    Cochrane, J.J.; Emerson, M.P.; Donahue, J.A.; Wolf, G.

    1996-01-01

    A questionnaire about operating, maintenance, and spare parts practices and station performance was sent to all HVDC converter stations worldwide. This survey is sponsored by IEEE Working Groups 15.05.08, Economics and Operating Strategies, and I7, Reliability of HVDC Converter Stations. Responses from 38 stations are analyzed, and information bout the most popular practices is reported. One important conclusion is that energy contracts, ac system constraints, and dedicated generation frequency have strong influences on the operation and maintenance practices of HVDC stations. A search is made for correlations between the operating, maintenance, and spare parts practices, including spending, and the stations` performance and availability. No conclusions about the most cost-effective practices can be made. The results are compared with those of a study published in 1992 which covered a few of the same topics.

  17. Hydrogen Scenario Analysis Summary Report: Analysis of the Transition to Hydrogen Fuel Cell Vehicles and the Potential Hydrogen Energy Infrastructure Requirements

    SciTech Connect (OSTI)

    Greene, David L; Leiby, Paul Newsome; James, Brian; Perez, Julie; Melendez, Margo; Milbrandt, Anelia; Unnasch, Stefan; Rutherford, Daniel; Hooks, Matthew

    2008-03-01

    Achieving a successful transition to hydrogen-powered vehicles in the U.S. automotive market will require strong and sustained commitment by hydrogen producers, vehicle manufacturers, transporters and retailers, consumers, and governments. The interaction of these agents in the marketplace will determine the real costs and benefits of early market transformation policies, and ultimately the success of the transition itself. The transition to hydrogen-powered transportation faces imposing economic barriers. The challenges include developing and refining a new and different power-train technology, building a supporting fuel infrastructure, creating a market for new and unfamiliar vehicles, and achieving economies of scale in vehicle production while providing an attractive selection of vehicle makes and models for car-buyers. The upfront costs will be high and could persist for a decade or more, delaying profitability until an adequate number of vehicles can be produced and moved into consumer markets. However, the potential rewards to the economy, environment, and national security are immense. Such a profound market transformation will require careful planning and strong, consistent policy incentives. Section 811 of the Energy Policy Act (EPACT) of 2005, Public Law 109-59 (U.S. House, 2005), calls for a report from the Secretary of Energy on measures to support the transition to a hydrogen economy. The report was to specifically address production and deployment of hydrogen-fueled vehicles and the hydrogen production and delivery infrastructure needed to support those vehicles. In addition, the 2004 report of the National Academy of Sciences (NAS, 2004), The Hydrogen Economy, contained two recommendations for analyses to be conducted by the U.S. Department of Energy (DOE) to strengthen hydrogen energy transition and infrastructure planning for the hydrogen economy. In response to the EPACT requirement and NAS recommendations, DOE's Hydrogen, Fuel Cells and

  18. BES Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  19. Eligibility Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligibility and required supporting documentation The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to enroll in the HDHP medical plan. Refer

  20. Competition Requirements

    Office of Environmental Management (EM)

    - Chapter 6.1 (January 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3.

  1. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  2. Highwall elimination and return to approximate original contour as required in the Surface Mining Control and Reclamation Act of 1977. Final report

    SciTech Connect (OSTI)

    Not Available

    1984-03-01

    The report covers the following issues concerning: highwall elimination, reclamation, and approximate original contour in surface-mining applications.

  3. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  4. Deployment Requirements

    Broader source: Energy.gov (indexed) [DOE]

    Troy, Michigan June 13, 2014 THIS PRESENTATION DOES NOT CONTAIN ANY PROPRIETARY, CONFIDENTIAL OR OTHERWISE RESTRICTED INFORMATION 2 Outline of talk * SAE 2719 Requirements and ...

  5. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  6. Reports

    Office of Legacy Management (LM)

    Reports . . . . , Book -1. Service Open File Information for Project Rulison, Production Testing Phase, . , August 28,1970 : . "; DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. DESCRIPTION O F PU1:T41C I-l!lkI,T;-1 SE1:VICh: 0P:SN F I L E INPOPt4ATION i[ ' 7 S&u-~%uestcrn E a d i o l o g i c a l H e a l t h 1,aboratol-p r? U. S. Depaieraent o f I l e a l t h ,. E d u c a t i o n aud

  7. "Order Module--DOE O 426.2, PERSONNEL SELECTION, TRAINING, QUALIFICATION, AND CERTIFICATION REQUIREMENTS FOR DOE NUCLEAR FACILITIES

    Broader source: Energy.gov [DOE]

    "To establish selection, training, qualification, and certification requirements for contractor personnel who can impact the safety basis through their involvement in the operation, maintenance,...

  8. Gradient maintenance: A new algorithm for fast online replanning

    SciTech Connect (OSTI)

    Ahunbay, Ergun E. Li, X. Allen

    2015-06-15

    Purpose: Clinical use of online adaptive replanning has been hampered by the unpractically long time required to delineate volumes based on the image of the day. The authors propose a new replanning algorithm, named gradient maintenance (GM), which does not require the delineation of organs at risk (OARs), and can enhance automation, drastically reducing planning time and improving consistency and throughput of online replanning. Methods: The proposed GM algorithm is based on the hypothesis that if the dose gradient toward each OAR in daily anatomy can be maintained the same as that in the original plan, the intended plan quality of the original plan would be preserved in the adaptive plan. The algorithm requires a series of partial concentric rings (PCRs) to be automatically generated around the target toward each OAR on the planning and the daily images. The PCRs are used in the daily optimization objective function. The PCR dose constraints are generated with dose–volume data extracted from the original plan. To demonstrate this idea, GM plans generated using daily images acquired using an in-room CT were compared to regular optimization and image guided radiation therapy repositioning plans for representative prostate and pancreatic cancer cases. Results: The adaptive replanning using the GM algorithm, requiring only the target contour from the CT of the day, can be completed within 5 min without using high-power hardware. The obtained adaptive plans were almost as good as the regular optimization plans and were better than the repositioning plans for the cases studied. Conclusions: The newly proposed GM replanning algorithm, requiring only target delineation, not full delineation of OARs, substantially increased planning speed for online adaptive replanning. The preliminary results indicate that the GM algorithm may be a solution to improve the ability for automation and may be especially suitable for sites with small-to-medium size targets surrounded by

  9. INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS

    SciTech Connect (OSTI)

    JOLLEY, WENDELL L

    2008-02-05

    On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

  10. Annual Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    412 Archive Data (The EIA-412 survey has been terminated.) The EIA-412 "Annual Electric Industry Financial Report" collected information such as income statements, balance sheets, sales and purchases, and transmission line data. Form EIA-412 data Schedules Year 2 Electric Balance Sheet 3 Electric Income Statement 4 Electric Plant 5 Taxes, Tax Equivalents, Contributions, and Services During Year 6 Sales of Electricity for Resale (Account 447) 7 Electric Operation and Maintenance

  11. Enterprise Assessments Assessment of Conduct of Maintenance at the Waste

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Isolation Pilot Plant - June 2016 | Department of Energy Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 Enterprise Assessments Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant - June 2016 June 2016 Assessment of Conduct of Maintenance at the Waste Isolation Pilot Plant The U.S. Department of Energy Office of Environment, Safety and Health Assessments, within the independent Office of Enterprise Assessments, conducted an assessment of the conduct

  12. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate

  13. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities,

  14. EV Everywhere: Electric Car Safety, Maintenance, and Battery Life |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Electric Vehicle Basics » EV Everywhere: Electric Car Safety, Maintenance, and Battery Life EV Everywhere: Electric Car Safety, Maintenance, and Battery Life EV Everywhere: Electric Car Safety, Maintenance, and Battery Life Plug-in electric vehicles (also known as electric cars or EVs) are as safe and easy to maintain as conventional vehicles. While driving conditions and habits will impact vehicle operation and vehicle range, some best practices can help you maximize

  15. Site transition framework for long-term surveillance and maintenance

    SciTech Connect (OSTI)

    2014-04-01

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

  16. Competition Requirements

    Energy Savers [EERE]

    ... For example, you may have a contract that has DoD funding that is under congressional ... Additionally, both civilian agencies and DoD will not report actions for petroleum or ...

  17. DOE-STD-1181-2004; Facility Maintenance Management Functional...

    Energy Savers [EERE]

    ... Assess the instructor qualifications for a selected maintenance training program to verify that instructors have the necessary credentials and skills to provide the training. ...

  18. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  19. Community Wind Handbook/Plan for Maintenance | Open Energy Information

    Open Energy Info (EERE)

    Community Wind HandbookPlan for Maintenance < Community Wind Handbook Jump to: navigation, search WIND ENERGY STAKEHOLDER ENGAGEMENT & OUTREACHCommunity Wind Handbook...

  20. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J. Light-emitting diode (LED), color shift, color stability, color maintenance, warranty Light-emitting...

  1. Operations and Maintenance Best Practices--A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide is designed to serve as a source for O&M management and technical staff. It ... OPERATION; EFFICIENCY; MAINTENANCE; MANAGEMENT; RECOMMENDATIONS Word Cloud More Like ...

  2. Operations & Maintenance Best Practices - A Guide to Achieving...

    Office of Scientific and Technical Information (OSTI)

    This guide highlights operations and maintenance programs targeting energy and water ... O&M management, technologies, energy and water efficiency, and cost-reduction approaches. ...

  3. Estimated Maintenance Cost Savings from a Geothermal Heat Pump...

    Office of Scientific and Technical Information (OSTI)

    Contract at Fort Polk, LA Citation Details In-Document Search Title: Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at ...

  4. Project Profile: Innovative Application of Maintenance-Free Phase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish ... a thermal energy storage (TES) system that, when combined with Infinia's ...

  5. Microsoft PowerPoint - CY11 Annual Report Presentation

    Office of Legacy Management (LM)

    ... Selected Highlights from 2011: Solar Ponds Plume 45 45 Selected Highlights from 2011: ... requires much more maintenance and power * Continue to operate Additional ...

  6. Task 3 - RMC method validation project report

    SciTech Connect (OSTI)

    Sarkinen, R.A.

    1996-08-01

    The EPRI Substation Reliability Centered Maintenance Project Task 3 uses utility data to validate the RCM process for maintenance in substations. At BPA, this project was used to validate the RCM method for a preventive maintenance program for substations. This project was performed by an RCM technical team and all maintenance personnel at the Chemawa Maintenance District Headquarters. The system chosen for, this project involved four transmission lines that feeds 230 kV Santiam Substation. This report explains the process for the system approach-used for the Santiam project and a summary of the results. The current preventive maintenance program is primarily based on time. The RCM approach for a preventive maintenance program realized significant savings.

  7. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    SciTech Connect (OSTI)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development.

  8. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    SciTech Connect (OSTI)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.; French, R.E.; Isidoro, R.J.; Kaestner, P.C.; Perkins, W.G.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  9. Building America Expert Meeting: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  10. AECL/U.S. INERI - Development of Inert Matrix Fuels for Plutonium and Minor Actinide Management in Power Reactors Fuel Requirements and Down-Select Report

    SciTech Connect (OSTI)

    William Carmack; Randy Fielding; Pavel Medvedev; Mitch Meyer

    2005-08-01

    This report documents the first milestone of the International Nuclear Energy Research Initiative (INERI) U.S./Euratom Joint Proposal 1.8 entitled “Development of Inert Matrix Fuels for Plutonium and Minor Actinide Management in Light-Water Reactors.” The milestone represents the assessment and preliminary study of a variety of fuels that hold promise as transmutation and minor actinide burning fuel compositions for light-water reactors. The most promising fuels of interest to the participants on this INERI program have been selected for further study. These fuel compositions are discussed in this report.

  11. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  12. Post-Closure Inspection and Monitoring Report for the Salmon, Mississippi, Site Calendar Year 2007

    SciTech Connect (OSTI)

    2008-05-01

    This report summarizes inspection and monitoring activities performed on and near the Salmon, Mississippi, Site in calendar year 2007. The Draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report is submitted to comply with that requirement. The Tatum Salt Dome was used by the U.S. Atomic Energy Commission (AEC) for underground nuclear testing during the cold war. The land surface above the salt dome, the Salmon Site, is located in Lamar County, Mississippi, approximately 12 miles west of Purvis (Figure 1). The U.S. Department of Energy (DOE), the successor to the AEC, is responsible for long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned this responsibility effective October 2006.

  13. National Energy Policy Plan; A Report to Congress Required by Title VIII of the Department of Energy Organization Act (Public Law 95-91)

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    This plan report is divided into the following chapters: the course ahead, currently predominant fuels (oil, gas), America's energy triad, sources of diversity and long-term supply, sources of uncertainty, summary of current projections, and public comments on the nation's policy toward energy. (DLC)

  14. Natural resources management activity and biodiversity maintenance

    SciTech Connect (OSTI)

    Caudell, M.B.

    1993-05-01

    Activities in coordinating land use for the Savannah River Site public lands during the period of July 1, 1992 to June 30, 1993 are reported.

  15. AS&T Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Applied Studies and Technology » AS&T Reports AS&T Reports 2016 Reports Uranium-Bearing Evaporite Mineralization Influencing Plume Persistence: Literature Review and DOE-LM Site Surveys Evaluation of Pre- and Post-Redevelopment Groundwater Chemical Analyses from LM Monitoring Wells 2014 Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End Summary Report 2013 Reports Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report

  16. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP/NP Requirements Review 2013 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 HEP Attendees 2013 FES Requirements Review 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  17. Control System Design Philosophy for Effective Operations and Maintenance

    SciTech Connect (OSTI)

    Karen S. White; Matthew Bickley

    2001-11-01

    A well-designed control system facilitates the functions of machine operation, maintenance and development. In addition, the overall effectiveness of the control system can be greatly enhanced by providing reliable mechanisms for coordination and communication, ensuring that these functions work in concert. For good operability, the information presented to operators should be consistent and easy to understand. The user interfaces should be simple to customize. A maintainable system allows a broken element to be quickly identified and repaired while leaving the balance of the system available. In a research and development environment, the control system must meet the frequently changing requirements of a variety of customers. This means the system must be flexible enough to allow for ongoing modifications with minimal disruptions to operations. Beyond the hardware and software elements of the control system, appropriate processes must be in place to maximize system uptime and allow people to work efficiently. Processes that provide automatic electronic communication ensure that information is not lost and reaches its destination in a timely fashion. This paper discusses how these control system design and quality issues have been applied at the Thomas Jefferson National Accelerator Facility. *This work was supported by the U.S. DOE contract No. DE-AC05-84ER40150.

  18. Independent Activity Report, Los Alamos Site Office - April 2012...

    Office of Environmental Management (EM)

    Independent Activity Report, Los Alamos Site Office - April 2012 April 2012 Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment ...

  19. Revenue Requirements Modeling System (RRMS) documentation. Volume I. Methodology description and user's guide. Appendix A: model abstract; Appendix B: technical appendix; Appendix C: sample input and output. [Compustat

    SciTech Connect (OSTI)

    Not Available

    1986-03-01

    The Revenue Requirements Modeling System (RRMS) is a utility specific financial modeling system used by the Energy Information Administration (EIA) to evaluate the impact on electric utilities of changes in the regulatory, economic, and tax environments. Included in the RRMS is a power plant life-cycle revenue requirements model designed to assess the comparative economic advantage of alternative generating plant. This report is Volume I of a 2-volume set and provides a methodology description and user's guide, a model abstract and technical appendix, and sample input and output for the models. Volume II provides an operator's manual and a program maintenance guide.

  20. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  1. AUDIT REPORT

    Energy Savers [EERE]

    Long-Term Surveillance and Maintenance of Uranium Mill Tailings Radiation Control Act of ... Maintenance of Uranium Mill Tailings Radiation Control Act of 1978 Title II Sites" ...

  2. Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites

    Broader source: Energy.gov [DOE]

    This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for...

  3. Microsoft PowerPoint - 7_MARY_MCCDONNELL_JOHN_BALLARD_Tips for REporting requirements_presentations_4-29-14.ppt [Compatibility

    National Nuclear Security Administration (NNSA)

    Tips for Successful Reporting to NMMSS by DOE Contractors and NRC Licensees John Ballard, DOE Reconciliation Mary McConnell, NRC Reconciliation LINK Technologies Outline  The NMMSS process  Best Practices  Tips for success  Resources  Facility Performance 2 NMMSS Flow of Data (Generic Depiction of Data Flow) 3 DOE/NRC Form 741 DOE/NRC Form 740M DOE Form DP-749 * Hardcopies by mail (U) * Faxes (U) * Email (U) * REM (U) * CREM (C) * SIPRNet (C) * SecureNet (C) Sites or Facilities

  4. Color Maintenance of LEDs in Laboratory and Field Applications

    SciTech Connect (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J.

    2013-09-30

    Synopsis: To date, consideration for parametric failure of LED products has largely been focused on lumen maintenance. However, color shift is a cause of early failure for some products, and is especially important to consider in certain applications, like museums, where visual appearance is critical. Example data collected by the GATEWAY program for LED lamps installed in museums shows that many have changed color beyond a reasonable tolerance well before their rated lifetime was reached, necessitating replacement. Similar data collected by the CALiPER program between 2008 and 2010 reveals that many early products shifted beyond acceptable tolerances in as little as a few thousand hours. In contrast, data from the L Prize program illustrates that commercially available LED products can have exemplary color stability that is unmatched by traditional light sources. Beyond presenting data from the aforementioned DOE programs, this report discusses the metrics used for communicating color shift—namely MacAdam ellipses and Δu'v'—as well as providing guidance for end users on how to monitor color shift and what to look for in manufacturer warranties. Also included are descriptions of the physical changes that have been documented as leading to color shift in some example types of LED packages. As with complete products, the data presented herein for LED packages shows that a wide variety of products are available; in order for specifiers and consumers to make educated choices, more detailed and standardized information should be made available.

  5. State-of-the-art report summarizing techniques to determine residual oil saturation and recommendations on the requirements for residual oil saturation research and development

    SciTech Connect (OSTI)

    Chang, M.M.; Maerefat, N.L.

    1986-05-01

    An investigation was conducted on the residual oil saturation (ROS) measurement techniques developed during the last fifteen years. Knowledge of precise ROS measurements is required for EOR project planning. The advantages, limitations, and problems of each one of the techniques are presented in tabulated form. Also, some of the possible improvements in the measurement techniques for the residual oil saturation are summarized. The following residual oil saturation techniques are discussed: core analyses, well logging, backflow tracer tests, material balance and well testing, newly developed gravity log methods, and interwell residual oil saturation measurements. Several aspects left to be improved in both instrumentations and data interpretation on pressure coring, back-flow tracer tests, well logging, material balance calculations, well testing, and interwell ROS measurements are presented. A nuclear magnetism log-inject-log method is proposed in which the need for porosity measurement for determining residual oil saturation is eliminated. 91 refs., 3 tabs.

  6. Post-Deactivation Surveillance and Maintenance Planning | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be

  7. Hopper scheduled maintenance tomorrow (Sept 19) and /project outage

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and /project outage Hopper scheduled maintenance tomorrow (Sept 19) and /project outage September 18, 2012 by Helen He There will be a scheduled hardware and software maintenance for Hopper next Wednesday, Sept 19, from 6:30 am to midnight Pacific time. Please plan your work accordingly and check the NERSC Message of the Day (MOTD) for status update: http://www.nersc.gov/live-status/motd/. The /project file system (also known as /global/project) will be

  8. Maintenance implementation plan for T Plant. Revision 2

    SciTech Connect (OSTI)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.

  9. Identification of the Spawning, Rearing, and Migratory Requirements of Fall Chinook Salmon in the Columbia River Basin, 1991 Annual Progress Report.

    SciTech Connect (OSTI)

    Rondorf, Dennis W.; Miller, William H.

    1993-07-01

    This document is the 1991 annual progress report for selected studies of fall chinook salmon Oncorhynchus tshawytscha conducted by the US Fish and Wildlife Service. The decline in abundance of fall chinook salmon in the Snake River basin has become a growing concern. In April 1992, Snake River fall chinook salmon were listed as ``threatened`` under the Endangered Species Act. Effective recovery efforts for fall chinook salmon can not be developed until we increase our knowledge of the factors that are limiting the various life history stages. This study attempts to identify those physical and biological factors which influence spawning of fall chinook salmon in the free-flowing Snake River and their rearing and seaward migration through Columbia River basin reservoirs.

  10. Steam trap maintenance management saves $180,000 annually

    SciTech Connect (OSTI)

    Franks, F.C.; Wickersham, C.

    1985-12-01

    The Reichhold Chemical plant is located in Elizabeth, NJ. At this location, the cost of steam had skyrocketed to $5.30 per million Btu. The plant has 600 steam traps manufactured by ten different companies. Some 17 different models of traps are used with 33 piping configurations. There are five different operating pressures throughout the plant ranging from 15-175 psig, including 30, 65, and 120 psig. Five different applications of steam usage can be broken down as follows: steam tracing (56%); drip (21%); comfort heating (18%); tank coil (4%); and process (1%). In the fall of 1983, the annual yearly inspection of steam traps was supplanted with an independent trap survey service, specializing in detecting the malfunctioning of various types of steam traps. The basic program included location and tagging of all steam traps; survey and inspection of steam trap population; development of a trap map; and full computer analysis of collected data. It was determined that approximately 3919 lb/hr of steam could be saved by repairing the failed open traps and implementing the report's recommendations. There were also benefits from fixing the failed closed traps which were out of service at the time of the survey. These traps do not allow the flow of steam or condensate to pass through the orifice. This condition causes condensate to back up and reduce efficiency. The maintenance management has been pleased with the results and recommendations of the program. It has provided them with a complete inventory and status report of the 600 traps plantwide. It saved $180,000 over the previous year in energy expenditures. This was the most important contribution in lowering the plant energy costs.

  11. Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  12. Estimated maintenance cost savings from a geothermal heat pump energy savings performance contract at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.

    1997-12-31

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all the equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  13. Audit of staffing requirements at the Westinghouse Savannah River Company

    SciTech Connect (OSTI)

    Not Available

    1994-01-25

    The Westinghouse Savannah River Company operates the Savannah River Site for the US Department of Energy (Department) under a cost-plus-award-fee contract. Department policies require contractors to ensure a high level of performance in operating Department facilities by establishing operating standards, assessing performance against such standards, and holding contractor employees accountable for their performance. The purpose of the audit was to review Westinghouse`s policies and practices for determining staffing requirements. Since assuming responsibility for the Savannah River Site in 1989, Westinghouse increased its staffing by over 4,000 employees. The Department had undertaken some actions to reduce the number of contractor employees at the Savannah River Site. Our audit showed that the use of industry and federal performance work standards in its construction and management activities could enable Westinghouse to further reduce its staff by over 1,800 employees. The potential savings in salaries and benefits associated with such action could be about $399 million over a 5-year period. Additional staffing reductions could be attained through the use of engineered time standards in the maintenance and fabrication shops. In addition, Westinghouse significantly understated, in periodic reports to the Department, the personnel resources applied to accomplish contract requirements. Of course, the actual staffing reductions realized would be largely determined by the manner in which the work standards are implemented and the levels of proficiency attained by the workforce.

  14. Minimizing maintenance with oil condition monitoring

    SciTech Connect (OSTI)

    2005-09-01

    Oil condition monitoring (OCM) involves the analysis of oil samples taken at specific points in the equipment at regular intervals. The condition of the oil, its pace of deterioration and the presence of contaminants provide important indicators of component wear or equipment failure. Shell Lubricants has developed a number of bespoke tests to meet equipment and operative requirements. 1 fig.

  15. Infrastructure Requirements for an Expanded Fuel Ethanol Industry

    SciTech Connect (OSTI)

    Reynolds, Robert E.

    2002-01-15

    This report provides technical information specifically related to ethanol transportation, distribution, and marketing issues. This report required analysis of the infrastructure requirements for an expanded ethanol industry.

  16. National Geothermal Data System Architecture Design, Testing and Maintenance

    Broader source: Energy.gov [DOE]

    Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

  17. Simple Maintenance Saves Costly Furnace Repair/Replacement

    Broader source: Energy.gov [DOE]

    For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance.

  18. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  19. John William (Bill) Ebert Jr. ? Longtime Y-12 Maintenance Manager

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    John William (Bill) Ebert Jr. - Longtime Y-12 Maintenance Manager I knew him as "Mr. Ebert" when his office was in Building 9734. I used to park my bicycle in the hallway just...

  20. TNRC 61 - General Provisions Use and Maintenance of Public Beaches...

    Open Energy Info (EERE)

    1 - General Provisions Use and Maintenance of Public Beaches Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: TNRC 61 - General...

  1. Maintenance Guide for DOE Low-Level Waste Disposal Facility

    Office of Environmental Management (EM)

    Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility ... for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments ...

  2. Website Maintenance Process and Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Below you can read more about EERE's expectations for website maintenance. In June and December every year, Web coordinators will be asked to attend two special Web Governance Team ...

  3. DOE Announces Webinars on Maintenance Practices for LED Streetlights, LED

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Color Stability, and More | Department of Energy Maintenance Practices for LED Streetlights, LED Color Stability, and More DOE Announces Webinars on Maintenance Practices for LED Streetlights, LED Color Stability, and More April 10, 2014 - 9:13am Addthis EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. Webinars are free; however, advanced registration is

  4. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  5. Aging management of fossil-fired plants of Electricite de France: PVP maintenance aspects

    SciTech Connect (OSTI)

    Thoraval, G.

    1995-12-01

    The generation mix of EDF comprises 17,000 MW of fossil-fired units, the ages of which go from 10 to 32 years. Extensive studies have been launched in 1994, inside the Company, to determine: (1) prospects of needs of the grid (domestic/exports); (2) prospects of possible competition in generation field; (3) environmental aspects and possible evolution; (4) adaptation of management of men and organizations; and (5) management of condition of equipment through maintenance policy. This paper focuses on the last item, spotted on pressure vessels and piping. The question is: How to conserve the ``patrimony`` for very long term, with lowest costs to keep it competitive in its very specific role? Several items are examined: (1) the background, the different programs of retrofitting, refurbishment and life extension; (2) conservation during outages, and mothballing procedures and experience; (3) design review, actual design life expectancy; (4) analysis of aging mechanisms through experience feedback; (5) determination of critical components, analysis of their condition, periodical updating; (6) maintenance adaptation, extensive condition-monitored maintenance approach: use of existing probes and data, development of new devices and skills; (7) policy of progressive replacement of worn-out and potentially dangerous components; examples concerning generic problems; (8) management of requirements of pressure vessels regulations; (9) adaptation of spare parts policy; and (10) research and development needed by life management.

  6. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect (OSTI)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  7. Final Report Grant No. DE-FG02-98ER20307 Lipopolysaccharide Structures and Genes Required for Root Nodule Development August 1, 2004 to July 31, 2008

    SciTech Connect (OSTI)

    Noel, K. Dale

    2008-12-07

    the roles of other important bacterial factors at multiple stages of nodule development. The project also investigated the biosynthesis of this bacterial factor. It has a complex structure and the first accomplishment was the determination of the sequences of genetic regions known to be important. Next the discovered genes were mutated to identify the 26 that are required for its synthesis. In addition, six others were discovered that are believed to change its structure under various environmental conditions. By studying mutants affected in specific genes, genes were associated with each of the predicted steps in the biosynthesis. Current work is testing the predicted biosynthetic model with studies conducted in vitro with bacterial extracts. Overall, the work funded by this grant establishes this system as a model for host-bacterial interactions based on specific polysaccharide structure. All areas that are needed for a comprehensive model have been significantly advanced: the biological function, the structural features that are crucial, the complete set of bacterial genes involved, and a model for the biosynthesis.

  8. 1980 annual report of the Coolidge Solar Irrigation Project

    SciTech Connect (OSTI)

    Torkelson, L.; Larson, D. L.

    1981-02-01

    The Coolidge Solar Irrigation Facility at Coolidge, Arizona, consists of a 2136.8-m/sup 2/ (23,000-ft/sup 2/) line-focus parabolic trough collector subsystem, a 113.55-m/sup 3/ (30,000-gallon) thermal storage subsystem, and a 150-kW/sub e/ (142.2-Btu/s) organic Rankine cycle power generation unit. The performance of the facility and its operational and maintenance requirements are reported. The period from the the facility's initial operation in October 1979 to 31 August 1980 is covered.

  9. Functions and requirements for 105-KE Basin sludge retrieval and packaging

    SciTech Connect (OSTI)

    Feigenbutz, L.V.

    1994-12-16

    Sludge, and the clouding due to sludge, interferes with basin operation and maintenance activities. This document defines the overall functions and requirements for sludge retrieval and packaging activities to be performed in the 105-KE Basin.

  10. NP Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  11. Cyber Security Requirements for Wireless Devices and Information Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-11

    The Notice establishes DOE policy requirements and responsibilities for using wireless networks and devices within DOE and implements the requirements of DOE 0 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, including requirements for cyber resource protection, risk management, program evaluation, and cyber security plan development and maintenance. No cancellation. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  12. Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

    2012-09-01

    This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

  13. Application of Standard Maintenance Windows in PHWR Outage

    SciTech Connect (OSTI)

    Fuming Jiang

    2006-07-01

    The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

  14. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    SciTech Connect (OSTI)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  15. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    SciTech Connect (OSTI)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  16. Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States

    Broader source: Energy.gov [DOE]

    For the United States to ensure that the substantial rollout of offshore wind energy projects envisioned by the DOE is carried out in an efficient and cost-effective manner, it is important to observe the current and emerging practices in the international offshore wind energy industry. In this manner, the United States can draw from the experience already gained around the world, combined with experience from the sizeable U.S. land-based wind industry, to develop a strong offshore wind sector. The work detailed in this report will support that learning curve by enabling optimization of the cost-effectiveness of installation, operation, and maintenance activities for offshore wind farms.

  17. Pollution prevention opportunity assessment for Facilities Maintenance Team (FMT) paint shop.

    SciTech Connect (OSTI)

    Klossner, Kristin Ann

    2003-05-01

    This Pollution Prevention Opportunity Assessment (PPOA) was conducted for Sandia National Laboratories/California Facilities Maintenance Team Paint Shop Operations in August and September 2002. The primary purpose of this PPOA is to provide recommendations to assist Paint Shop personnel in reducing the generation of waste and improving the efficiency of their processes. This report contains a summary of the information collected and analyses performed and recommends options for implementation. The Sandia National Laboratories Pollution Prevention staff will continue to work with the Paint Shop to implement the recommendations.

  18. Maintenance of solar systems--Housing and urban development demonstration program

    SciTech Connect (OSTI)

    Freeborne, W.E.

    1983-06-01

    The Department of Housing and Urban Development (HUD) residential solar heating and cooling demonstration program provided funding support for over 600 solar projects. These projects provide the largest single data base of solar heating and cooling experience now available. These data suggest that maintenance and system operation have been mixed even though system configurations are similar throughout the program. HUD has been involved in the upgrading of one-third of the 600 solar projects and now can report that projects can be maintained with a more uniform level of effort.

  19. Solving complex maintenance planning optimization problems using stochastic simulation and multi-criteria fuzzy decision making

    SciTech Connect (OSTI)

    Tahvili, Sahar; Österberg, Jonas; Silvestrov, Sergei; Biteus, Jonas

    2014-12-10

    One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms of a suggested framework model based on discrete event simulation.

  20. Transmission Reassignment Reporting Requirement - April 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    capacity reassignments, including but not limited to pricing information, on BPA's Open Access Same-Time Information System (OASIS). Customers reassigning transmission...

  1. Reinvestment Act Reporting Requirements. B. References:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reindustrialization Reindustrialization As EM cleans ETTP, private companies are investing and developing the site. The goal is to transform the site into a privately-owned industrial park. As EM cleans ETTP, private companies are investing and developing the site. The goal is to transform the site into a privately-owned industrial park. Oak Ridge's EM and reindustrialization missions are closely connected. As cleanup advances, the Department of Energy is able to open more facilities and land

  2. Review Policy / Proposal Guidelines / Reporting Requirements...

    Office of Science (SC) Website

    ... most recent Comparative Review FOA, please go to the HEP Funding Opportunities web page. ... assistance award, please view the Office of Science's Funding Opportunities web page. ...

  3. Amount of Zeolite Required to Meet the Constraints Established by the Energetic Materials Research and Testing Center (EMRTC) Report RF 10-13: Application of Los Alamos National Laboratory (LANL) Evaporator Nitrate Salts

    Broader source: Energy.gov [DOE]

    Supporting Technical Document for the Radiological Release Accident Investigation Report (Phase II Report)

  4. Reporting Guidance for Federal Agency Annual Report on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance includes three attachments that were developed to assist agencies with their reporting requirements. Open the reporting requirements template to access: Attachment 1: ...

  5. Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Electric Vehicles Maintenance and Safety of Hybrid and Plug-In Electric Vehicles to someone by E-mail Share Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Twitter Bookmark Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Google Bookmark Alternative Fuels Data Center: Maintenance

  6. Operations and Maintenance Lead-by-Example Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations and Maintenance Lead-by-Example Resources Operations and Maintenance Lead-by-Example Resources State and local governments can lead by example by promoting energy efficiency programs and policies for public facilities, equipment, and government operations. Find operations and maintenance lead-by-example resources below. DOE Resource Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency Other Resource School Operations and Maintenance: Best Practices

  7. Review of Maintenance and Repair Times for Components in Technological Facilities

    SciTech Connect (OSTI)

    L. C. Cadwallader

    2012-11-01

    This report is a compilation of some unique component repair time data and it also presents citations of more extensive reports where lists of repair times can be found. This collection of information should support analysts who seek to quantify maintainability and availability of high technology and nuclear energy production systems. While there are newer sources of repair time information, most, if not all, of the newer sources are proprietary and cannot be shared. This report offers data that, while older, is openly accessible and can serve as reasonable estimates of repair times, at least for initial studies. Some times were found for maintenance times in radiation environments, and some guidance for multiplicative factors to use to account for work in contamination areas.

  8. Operations & Maintenance Best Practices Guide: Release 3.0

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 4 Computerized Maintenance � Management System � 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs functions in support of management and tracking of O&M activities. 4.2 CMMS Needs Assessment In determining the need for a CMMS, facility managers should assess their current mode of operation. Key questions to ask include: * Do you have an effective way to generate and track work orders? How do you verify the work

  9. Using condition monitoring for maintenance, control of hydro plants

    SciTech Connect (OSTI)

    Brown, N.; Varo, R.; Morras, F.A.

    1994-12-31

    Electric utilities are actively seeking ways of optimizing the economics of their operations by improving productivity and reducing time and money spent on maintenance. Iberdrola, a Spanish utility, is using advanced machine condition-monitoring technology to centralize control and maintenance of its hydropower projects as a means of achieving those goals. The company is using a blend of technologies to supervise their projects from a regional control center. The monitoring scheme makes use of data from on-line, machine-condition monitors, displays from in-plant audio asnd video equipment, and analysis from the control center`s SCADA system.

  10. Personnel Selection, Qualification, and Training Requirements for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-07-12

    To establish selection, qualification, and training requirements for management and operating (M&O) contractor personnel involved in the operation, maintenance, and technical support of Department of Energy and National Nuclear Security Administration Category A and B reactors and non-reactor nuclear facilities. Canceled by DOE O 426.2

  11. Remote Handling and Maintenance in the Facility for Rare Isotope Beams

    SciTech Connect (OSTI)

    Burgess, Thomas W; Aaron, Adam M; Carroll, Adam J; DeVore, Joe R; Giuliano, Dominic R; Graves, Van B; Bennett, Richard P; Bollen, Georg; Cole, Daniel F.; Ronningen, Reginald M.; Schein, Mike E; Zeller, Albert F

    2011-01-01

    Michigan State University (MSU) in East Lansing, MI was selected by the U.S. Department of Energy (DOE) to design and establish a Facility for Rare Isotope Beams (FRIB), a cutting-edge research facility to advance the understanding of rare nuclear isotopes and the evolution of the cosmos. The research conducted at the FRIB will involve experimentation with intense beams of rare isotopes within a well-shielded target cell that will result in activation and contamination of components. The target cell is initially hands-on accessible after shutdown and a brief cool-down period. Personnel are expected to have hands-on access to the tops of shielded component modules with the activated in-beam sections suspended underneath. The modules are carefully designed to include steel shielding for protecting personnel during these hand-on operations. However, as the facility has greater levels of activation and contamination, a bridge mounted servomaniputor may be added to the cell, to perform the disconnecting of services to the component assemblies. Dexterous remote handling and exchange of the modularized activated components is completed at a shielded window workstation with a pair of master-slave manipulators. The primary components requiring exchange or maintenance are the production target, the beam wedge filter, the beam dump, and the beam focusing and bending magnets. This paper provides an overview of the FRIB Target Facility remote handling and maintenance design requirements, concepts, and techniques.

  12. 1993 PVUSA progress report

    SciTech Connect (OSTI)

    1993-12-31

    Photovoltaics for Utility Scale Applications (PVUSA) is a national public-private partnership that is assessing and demonstrating the viability of utility-scale photovoltaic (PV) electric generation systems and recent developments in module technology. This report updates the progress of the PVUSA project, review the status and performance of all PV installations during 1993, and summarizes key accomplishments and conclusions for the year. The PVUSA project has five objectives designed to narrow the gap between a large utility industry that is unfamiliar with PV, and a small PV industry that is aware of a potentially large utility market but unfamiliar with how to meet its requirements. The objectives are: to evaluate the performance, reliability, and cost of promising PV modules and balance-of-system (BOS) components side-by-side at a single location; to assess PV system operation and maintenance (O and M) in a utility setting; to compare PV technologies in diverse geographic areas; to provide US utilities with hands-on experience in designing, procuring, and operating PV systems; and to document and disseminate knowledge gained from the project.

  13. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report

    SciTech Connect (OSTI)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  14. Network Requirements Workshop - Documents and Background Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » Documents and Background Materials Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR

  15. ASCR Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Tierney, Brian

    2009-08-24

    performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

  16. Criteria Document for B-plant Surveillance and Maintenance Phase Safety Basis Document

    SciTech Connect (OSTI)

    SCHWEHR, B.A.

    1999-08-31

    This document is required by the Project Hanford Managing Contractor (PHMC) procedure, HNF-PRO-705, Safety Basis Planning, Documentation, Review, and Approval. This document specifies the criteria that shall be in the B Plant surveillance and maintenance phase safety basis in order to obtain approval of the DOE-RL. This CD describes the criteria to be addressed in the S&M Phase safety basis for the deactivated Waste Fractionization Facility (B Plant) on the Hanford Site in Washington state. This criteria document describes: the document type and format that will be used for the S&M Phase safety basis, the requirements documents that will be invoked for the document development, the deactivated condition of the B Plant facility, and the scope of issues to be addressed in the S&M Phase safety basis document.

  17. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  18. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  19. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled Establishing an In-house Wind Maintenance Program, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  20. PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE

    Broader source: Energy.gov [DOE]

    Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant’s (WIPP) preventive maintenance program paid huge dividends late last month when an issue with a steel rope on the project’s waste conveyance was identified during a routine inspection.

  1. Low-level waste vitrification contact maintenance viability study

    SciTech Connect (OSTI)

    Leach, C.E., Westinghouse Hanford

    1996-07-12

    This study investigates the economic viability of contact maintenance in the Low-Level Waste Vitrification Facility, which is part of the Hanford Site Tank Waste Remediation System. This document was prepared by Flour Daniel, Inc., and transmitted to Westinghouse Hanford Company in September 1995.

  2. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  3. CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

  4. SANDIA REPORT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 28 Wind Farm Comparison ... 28 Operation and Maintenance Value ... Equipment Baseline Costs 12 Table 2. 100m Blade ...

  5. Type B Investigation Report for 241-SY-101 Pump Start and 241-C-106 Pit Cleanout

    SciTech Connect (OSTI)

    Ewalt, J.R.

    1993-09-01

    In accordance with the direction of the Department of Energy (DOE) Manager, Richland Operations Office, a Type ``B`` investigation in accordance with the DOE Order 5484.1, Environmental Protection, Safety and Health Protection Information Reporting Requirements, has been conducted. The scope of the investigation included two events: The ``Inadvertent Mixer Pump Operation at 241-SY-101`` (RL-WHC-TANK FARM-1993-069); ``Inadequate Work Control Results in Personnel Skin Contamination at 241-C-106, Pit B`` (RL-WHC-TANK FARM-1993-071) events. Additionally, at the request of the President of the WHC, a broader investigation into Waste Tank Farm ``safety practices`` and ``Conduct of Operations`` was also conducted. The review was focused on (1) WHC organizations performing operations, maintenance, and radiological safety tasks; and (2) KEH organizations performing major maintenance tasks.

  6. Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility at the INL Site

    SciTech Connect (OSTI)

    Idaho Cleanup Project

    2006-06-01

    The Waste Calcining Facility (WCF) is located at the Idaho Nuclear Technology and Engineering Center. In 1998, the WCF was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the WCF to ensure continued protection of human health and the environment. The post-closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report.

  7. Final Report

    SciTech Connect (OSTI)

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  8. Requirements for Wind Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2015 Oklahoma amended the Oklahoma Wind Energy Development Act. The amendments added new financial security requirements, setback requirements, and notification requirements for wind energy...

  9. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  10. Network Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous...

  11. Catalytic oxidizers and Title V requirements

    SciTech Connect (OSTI)

    Uberoi, M.; Rach, S.E.

    1999-07-01

    Catalytic oxidizers have been used to reduce VOC emissions from various industries including printing, chemical, paint, coatings, etc. A catalytic oxidizer uses a catalyst to reduce the operating temperature for combustion to approximately 600 F, which is substantially lower than thermal oxidation unit. Title V requirements have renewed the debate on the best methods to assure compliance of catalytic oxidizers, with some suggesting the need for continuous emission monitoring equipment. This paper will discuss the various aspects of catalytic oxidation and consider options such as monitoring inlet/outlet temperatures, delta T across the catalyst, periodic laboratory testing of catalyst samples, and preventive maintenance procedures as means of assuring continuous compliance.

  12. Annual site environmental report for calendar year 1988

    SciTech Connect (OSTI)

    1988-12-31

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  13. Annual site environmental report for calendar year 1991

    SciTech Connect (OSTI)

    1991-12-31

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  14. Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned

    SciTech Connect (OSTI)

    Surovchak, S.; Kaiser, L.; DiSalvo, R.; Boylan, J.; Squibb, G.; Nelson, J.; Darr, B.; Hanson, M.

    2008-07-01

    The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

  15. Savannah River Laboratory monthly report, February 1992

    SciTech Connect (OSTI)

    Ferrell, J.M.; Ice, L.W.

    1992-02-01

    This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

  16. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR...

    Office of Environmental Management (EM)

    3.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this ...

  17. Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of...

    Office of Environmental Management (EM)

    Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A ...

  18. Scheduled Maintenance - WebApps - 6-9 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance - WebApps - 6-9 On Thursday, June 9th, the internal web-application ... webapps5.ameslab.gov) will undergo scheduled maintenance from 9am to noon. ...

  19. OpenEI maintenance March 8-9, 2013 | OpenEI Community

    Open Energy Info (EERE)

    OpenEI maintenance March 8-9, 2013 Home > Groups > Utility Rate Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 developer Maintenance OpenEI We would...

  20. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report

    SciTech Connect (OSTI)

    Stanley E. Ritterbusch, et. al.

    2003-01-29

    accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was