Powered by Deep Web Technologies
Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Accurate estimation of abundance of cetaceans from survey data requires  

E-Print Network (OSTI)

to both survey design and analysis (Buckland et al., 2001). Aerial surveys of cetaceans depend on rapid- tion of abundance. We present here the results of a series of aerial surveys designed to estimate survey, an object or group of objects is encountered, an aerial observer has only a few seconds

2

Requirements for motion-estimation search range in MPEG-2 coded video  

Science Conference Proceedings (OSTI)

The motion-estimation search range required for interframe encoding with the MPEG-2 video compression standard depends on a number of factors, including video content, video resolution, elapsed time between reference and predicted pictures, and, just ...

C. A. Gonzales; H. Yeo; C. J. Kuo

1999-07-01T23:59:59.000Z

3

Communication Capacity Requirement for Reliable and Secure State Estimation in Smart Grid  

E-Print Network (OSTI)

1 Communication Capacity Requirement for Reliable and Secure State Estimation in Smart Grid Husheng, Cookeville, TN Abstract-- Secure system state estimation is an important issue in smart grid to assure the information the- oretic perspective. The smart grid is modeled as a linear dynamic system. Then, the channel

Qiu, Robert Caiming

4

Capital requirements for the transportation of energy materials: 1979 arc estimates  

Science Conference Proceedings (OSTI)

Summaries of transportation investment requirements through 1990 are given for the low, medium and high scenarios. Total investment requirements for the three modes and the three energy commodities can accumulate to a $46.3 to $47.0 billion range depending on the scenario. The high price of oil, following the evidence of the last year, is projected to hold demand for oil below the recent past. Despite the overall decrease in traffic some investment in crude oil and LPG pipelines is necessary to reach new sources of supply. Although natural gas production and consumption is projected to decline through 1990, new investments in carrying capacity also are required due to locational shifts in supply. The Alaska Natural Gas Transportation System is the dominant investment for energy transportation in the next ten years. This year's report focuses attention on waterborne coal transportation to the northeast states in keeping with a return to significant coal consumption projected for this area. A resumption of such shipments will require a completely new fleet. The investment estimates given in this report identify capital required to transport projected energy supplies to market. The requirement is strategic in the sense that other reasonable alternatives do not exist or that a shared load of new growth can be expected. Not analyzed or forecasted are investments in transportation facilities made in response to local conditions. The total investment figures, therefore, represent a minimum necessary capital improvement to respond to changes in interregional supply conditions.

Not Available

1980-08-29T23:59:59.000Z

5

Capital requirements for the transportation of energy materials: 1979 ARC estimates. Draft final report  

SciTech Connect

This report contains TERA's estimates of capital requirements to transport natural gas, crude oil, petroleum products, and coal in the United States by 1990. The low, medium, and high world-oil-price scenarios from the EIA's Mid-range Energy Forecasting System (MEFS), as used in the 1979 Annual Report to Congress (ARC), were provided as a basis for the analysis and represent three alternative futures. TERA's approach varies by energy commodity to make best use of the information and analytical tools available. Summaries of transportation investment requirements through 1990 are given. Total investment requirements for three modes (pipelines, rails, waterways and the three energy commodities can accumulate to a $49.9 to $50.9 billion range depending on the scenario. The scenarios are distinguished primarily by the world price of oil which, given deregulation of domestic oil prices, affects US oil prices even more profoundly than in the past. The high price of oil, following the evidence of the last year, is projected to hold demand for oil below the recent past.

Not Available

1980-08-13T23:59:59.000Z

6

Integrity-directed sequential state estimation: Assessing high reliability requirements via safe confidence intervals  

Science Conference Proceedings (OSTI)

This study deals with the problem of dynamic state estimation of continuous-time systems from discrete-time measurements in the context of high-integrity applications. The objective of integrity-directed estimation is to provide confidence intervals ... Keywords: Bayesian framework, Dynamic estimation, Dynamic multiple-model estimator, Fault detection, Gaussian mixture, Integrity, Kalman filter, Kullback-Leibler distance, Markov chains, Odometry, Overbounding, Rail navigation, Robust estimation, Safe navigation systems

Olivier Bilenne

2007-01-01T23:59:59.000Z

7

Estimating the Required Investment to Attain Region M Water Savings Through Rehabilitation of Water-Delivery Infrastructure – 2005 Perspectives  

E-Print Network (OSTI)

Irrigation districts in the Texas Lower Rio Grande Valley use an antiquated water-delivery conveyance system; which loses substantial water from seepage, evaporation, etc. Pressures are increasing for districts to improve their operational efficiencies. Rehabilitation of the system has been estimated to save approximately 211,000 ac-ft of water annually; which can benefit agricultural, municipal, and industrial users in the region. Combining these estimated savings with prior economic and financial analyses of 17 proposed rehabilitative project components result in an extrapolated estimated required initial capital investment of $157.8 million in rehabilitative measures to attain the 211,000 ac-ft of annual savings. A caveat to the exactness of this dollar estimate is warranted, however, because this single-point estimate is built upon other estimates (e.g., water savings, initial construction costs, etc.) by irrigation district management, consulting engineers, and university scientists. Future application of on-going economic work, combined with an ‘in-process’ revised estimate of potential water savings (i.e., from the current 211,000 ac-ft), could provide an improved investment estimate in the future.

Lacewell, Ronald D.; Rister, M. Edward; Sturdivant, Allen W.

2005-03-15T23:59:59.000Z

8

Real Time Simulation and Visualization of NC Milling Processes for Inhomogeneous Materials on Low-End Graphics Hardware  

E-Print Network (OSTI)

Simulation and visualization of NC milling processes has become an important step in computer aided manufacturing. The usage of stock materials with specific locally varying properties (like density, accuracy, color,. . . ) becomes more and more important with new technologies emerging in the material industry. Our new approach, using volumetric representation, has been adapted to this needs and copes with inhomogeneous material properties. Taking color as one possible material property, our approach enables the visualization of milled wood or compound materials. Furthermore, our approach has been developed with the usage of low-end graphics hardware in mind. The algorithms have been optimized to ensure interactive update rates even on standard personal computers without hardware graphics acceleration. Keywords: NC milling simulation, dexel approach, inhomogeneous material properties 1. Introduction NC milling simulation using computer graphics techniques was proposed some years ag...

Andreas Holger König; Eduard Gröller

1998-01-01T23:59:59.000Z

9

Estimates of power requirements for a manned Mars rover powered by a nuclear reactor  

Science Conference Proceedings (OSTI)

This paper assesses the power requirement for a Manned Mars Rover vehicle. Auxiliary power needs are fulfilled using a hybrid solar photovoltaic/regenerative fuel cell system while the primary power needs are met using an SP?100 type reactor. The primary electric power needs

Nicholas J. Morley; Mohamed S. El?Genk; Robert Cataldo; Harvey Bloomfield

1991-01-01T23:59:59.000Z

10

Spent fuel disassembly hardware and other non-fuel bearing components: characterization, disposal cost estimates, and proposed repository acceptance requirements  

SciTech Connect

There are two categories of waste considered in this report. The first is the spent fuel disassembly (SFD) hardware. This consists of the hardware remaining after the fuel pins have been removed from the fuel assembly. This includes end fittings, spacer grids, water rods (BWR) or guide tubes (PWR) as appropriate, and assorted springs, fasteners, etc. The second category is other non-fuel-bearing (NFB) components the DOE has agreed to accept for disposal, such as control rods, fuel channels, etc., under Appendix E of the standard utiltiy contract (10 CFR 961). It is estimated that there will be approximately 150 kg of SFD and NFB waste per average metric ton of uranium (MTU) of spent uranium. PWR fuel accounts for approximately two-thirds of the average spent-fuel mass but only 50 kg of the SFD and NFB waste, with most of that being spent fuel disassembly hardware. BWR fuel accounts for one-third of the average spent-fuel mass and the remaining 100 kg of the waste. The relatively large contribution of waste hardware in BWR fuel, will be non-fuel-bearing components, primarily consisting of the fuel channels. Chapters are devoted to a description of spent fuel disassembly hardware and non-fuel assembly components, characterization of activated components, disposal considerations (regulatory requirements, economic analysis, and projected annual waste quantities), and proposed acceptance requirements for spent fuel disassembly hardware and other non-fuel assembly components at a geologic repository. The economic analysis indicates that there is a large incentive for volume reduction.

Luksic, A.T.; McKee, R.W.; Daling, P.M.; Konzek, G.J.; Ludwick, J.D.; Purcell, W.L.

1986-10-01T23:59:59.000Z

11

Short communication: Design tool for estimation of buffer requirement for enhanced reductive dechlorination of chlorinated solvents in groundwater  

Science Conference Proceedings (OSTI)

To assist in the design of enhanced reductive dechlorination systems for in situ remediation of chlorinated solvent source zones, the software BUCHLORAC (BUffering of deCHLORination ACidity) was developed to predict the amount of buffer required to maintain ... Keywords: Alkalinity, BUCHLORAC, Bicarbonate, Contaminated aquifer, DNAPL, Dechlorination, Dehalogenation, PCE, PHREEQC, Remediation, TCE

Clare Robinson; D. A. Barry

2009-11-01T23:59:59.000Z

12

An Estimate of Diesel High-Efficiency Clean Combustion Impacts on FTP-75 Aftertreatment Requirements (SAE Paper Number 2006-01-3311)  

SciTech Connect

A modified Mercedes 1.7-liter, direct-injection diesel engine was operated in both normal and high-efficiency clean combustion (HECC) combustion modes. Four steady-state engine operating points that were previously identified by the Ad-hoc fuels working group were used as test points to allow estimation of the hot-start FTP-75 emissions levels in both normal and HECC combustion modes. The results indicate that operation in HECC modes generally produce reductions in NOX and PM emissions at the expense of CO, NMHC, and H2CO emissions. The FTP emissions estimates indicate that aftertreatment requirements for NOX are reduced, while those for PM may not be impacted. Cycle-average aftertreatment requirements for CO, NMHC, and H2CO may be challenging, especially at the lowest temperature conditions.

Sluder, Scott [ORNL; Wagner, Robert M [ORNL

2006-01-01T23:59:59.000Z

13

Science Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Requirements About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network...

14

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report  

SciTech Connect

With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

1995-11-01T23:59:59.000Z

15

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report  

Science Conference Proceedings (OSTI)

With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

16

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

17

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

18

Software Cost Estimation  

E-Print Network (OSTI)

Software cost estimation is the process of predicting the effort required to develop a software system. Many estimation models have been proposed over the last 30 years. This paper provides a general overview of software cost estimation methods including the recent advances in the field. As a number of these models rely on a software size estimate as input, we first provide an overview of common size metrics. We then highlight the cost estimation models that have been proposed and used successfully. Models may be classified into 2 major categories: algorithmic and non-algorithmic. Each has its own strengths and weaknesses. A key factor in selecting a cost estimation model is the accuracy of its estimates. Unfortunately, despite the large body of experience with estimation models, the accuracy of these models is not satisfactory. The paper includes comment on the performance of the estimation models and description of several newer approaches to cost estimation.

Hareton Leung Zhang; Zhang Fan

2002-01-01T23:59:59.000Z

19

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report  

SciTech Connect

The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

20

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - main report. Final report  

SciTech Connect

The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low- level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Required Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

22

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

23

School requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

a smooth surface and no "lip". Some presentations require AV equipment such as LCD or overhead projectors. A wireless microphone and sound system may be helpful to ensure that...

24

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

25

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

26

Competition Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

27

Faster Phase Estimation  

E-Print Network (OSTI)

We develop several algorithms for performing quantum phase estimation based on basic measurements and classical post-processing. We present a pedagogical review of quantum phase estimation and simulate the algorithm to numerically determine its scaling in circuit depth and width. We show that the use of purely random measurements requires a number of measurements that is optimal up to constant factors, albeit at the cost of exponential classical post-processing; the method can also be used to improve classical signal processing. We then develop a quantum algorithm for phase estimation that yields an asymptotic improvement in runtime, coming within a factor of log* of the minimum number of measurements required while still requiring only minimal classical post-processing. The corresponding quantum circuit requires asymptotically lower depth and width (number of qubits) than quantum phase estimation.

Krysta M. Svore; Matthew B. Hastings; Michael Freedman

2013-04-02T23:59:59.000Z

28

Cooling load estimation methods  

DOE Green Energy (OSTI)

Ongoing research on quantifying the cooling loads in residential buildings, particularly buildings with passive solar heating systems, is described. Correlations are described that permit auxiliary cooling estimates from monthly average insolation and weather data. The objective of the research is to develop a simple analysis method, useful early in design, to estimate the annual cooling energy required of a given building.

McFarland, R.D.

1984-01-01T23:59:59.000Z

29

ASHRAE Standard 90.1-2007 -- Building Envelope Requirements ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements This course provides an overview of the building envelope requirements of ASHRAE Standard 90.1-2007. Estimated Length: 1 hour, 4 minutes Presenters: John Hogan, City...

30

GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GAO Cost Estimating and Assessment Guide GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process Step Description Associated task 1 Define estimate's purpose Determine estimate's purpose, required level of detail, and overall scope; Determine who will receive the estimate 2 Develop estimating plan Determine the cost estimating team and develop its master schedule; Determine who will do the independent cost estimate; Outline the cost estimating approach; Develop the estimate timeline 3 Define program characteristics In a technical baseline description document, identify the program's

31

Recovery May Require Holding Stocks Level in February and March  

Gasoline and Diesel Fuel Update (EIA)

have dropped back as new supplies are appearing, but we still have dropped back as new supplies are appearing, but we still have nearly a month of winter ahead of us. Stocks cannot drop much farther. February 4 stock levels were just above the lowest month-end levels ever seen for PADD 1, which occurred in April 1996. For stocks to recover to the low end of the normal range, they would have to stay level in February in March, when normally they would be used to meet demand. Keeping stocks level would require finding supply to substitute for the average stock drops of 290 thousand barrels per day (8 million barrels) in February and 210 thousand barrels per day (6 million barrels) in March. If all of that supply were to come from imports, we would have to see distillate imports into PADD 1 double from their average levels of 7

32

Frequency tracking and parameter estimation for robust quantum state estimation  

SciTech Connect

In this paper we consider the problem of tracking the state of a quantum system via a continuous weak measurement. If the system Hamiltonian is known precisely, this merely requires integrating the appropriate stochastic master equation. However, even a small error in the assumed Hamiltonian can render this approach useless. The natural answer to this problem is to include the parameters of the Hamiltonian as part of the estimation problem, and the full Bayesian solution to this task provides a state estimate that is robust against uncertainties. However, this approach requires considerable computational overhead. Here we consider a single qubit in which the Hamiltonian contains a single unknown parameter. We show that classical frequency estimation techniques greatly reduce the computational overhead associated with Bayesian estimation and provide accurate estimates for the qubit frequency.

Ralph, Jason F. [Department of Electrical Engineering and Electronics, University of Liverpool, Brownlow Hill, Liverpool L69 3GJ (United Kingdom); Jacobs, Kurt [Department of Physics, University of Massachusetts at Boston, 100 Morrissey Blvd, Boston, Massachusetts 02125 (United States); Hill, Charles D. [Centre for Quantum Computation and Communication Technology, School of Physics, University of Melbourne, Victoria 3010 (Australia)

2011-11-15T23:59:59.000Z

33

Quantifying requirements volatility effects  

Science Conference Proceedings (OSTI)

In an organization operating in the bancassurance sector we identified a low-risk IT subportfolio of 84 IT projects comprising together 16,500 function points, each project varying in size and duration, for which we were able to quantify its requirements ... Keywords: ?-ratio, ?-ratio, Compound monthly growth rate, IT dashboard, IT portfolio management, Quantitative IT portfolio management, Requirements churn, Requirements creep, Requirements metric, Requirements scrap, Requirements volatility, Requirements volatility dashboard, Scope creep, Volatility benchmark, Volatility tolerance factor

G. P. Kulk; C. Verhoef

2008-08-01T23:59:59.000Z

34

Enhanced oil recovery water requirements  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are evaluated using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in 14 major oil companies. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and CO/sub 2/, micellar-polymer, polymer, and caustic flooding) in those states and specific geographic locations where these processes will play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources. A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can reduce significantly the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality surface water and ground water could be impediments to certain projects in the near future.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1983-03-01T23:59:59.000Z

35

BER Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

36

ASCR Requirements Review 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements...

37

TVDG Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Training Requirements TVDG Training Requirements information is now located at: http:www.bnl.govuserscenterTrainingtandem.asp. You will automatically be taken to the new...

38

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Main report, draft report for comment. Volume 1  

Science Conference Proceedings (OSTI)

On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

1994-09-01T23:59:59.000Z

39

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2  

SciTech Connect

On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J. [Pacific Northwest Lab., Richland, WA (United States)] [and others

1994-09-01T23:59:59.000Z

40

HAN System Security Requirements  

Science Conference Proceedings (OSTI)

This report, "Home Area Network (HAN) Security Requirements," identifies and discusses the key cyber security requirements for different interfaces of HAN-based systems. These cyber security requirements for HAN interfaces are derived from the Department of Homeland Security (DHS) "Catalog of Control Systems Security," which provides an excellent checklist of general security requirements.

2009-12-22T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

ASHRAE Standard 90.1-2004 -- Lighting and Power Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

This course provides an overview of the lighting and power requirements of ASHRAE Standard 90.1-2004. Estimated Length: 50 minutes Presenters: Eric Richman, Pacific...

42

Quantum estimation of relative information  

E-Print Network (OSTI)

We derive optimal schemes for preparation and estimation of relational degrees of freedom between two quantum systems. We specifically analyze the case of rotation parameters representing relative angles between elements of the SU(2) symmetry group. Our estimation procedure does not assume prior knowledge of the absolute spatial orientation of the systems and as such does not require information on the underlying classical reference frame in which the states are prepared.

Netanel H. Lindner; Petra F. Scudo; Dagmar Bruss

2005-06-27T23:59:59.000Z

43

Admission Requirements Admission Requirements for Graduate Study  

E-Print Network (OSTI)

required reports. Such a candidate may, for a nominal fee and with the approval of his/her graduate advisor://www.utdallas.edu/admissions/graduate/degrees/ There is a $50.00 nonrefundable application fee. Applicants are advised to carefully review the program a bachelor's degree. Test Scores (GMAT, GRE) Standardized test scores must be official and reported directly

O'Toole, Alice J.

44

Requirement-Reviews.pptx  

NLE Websites -- All DOE Office Websites (Extended Search)

Published 3 h%p:www.nersc.govsciencerequirements---reviews final---reports * Compurequirements f or 20132014 * Execurequirements * Case s...

45

Seismic Performance Requirements for WETF  

Science Conference Proceedings (OSTI)

This report develops recommendations for requirements on the Weapons Engineering Tritium Facility (WETF) performance during seismic events. These recommendations are based on fragility estimates of WETF structures, systems, and components that were developed by LANL experts during facility walkdowns. They follow DOE guidance as set forth in standards DOE-STD-1021-93, ''Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components'' and DOE-STD-1020-94, ''Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities''. Major recommendations are that WETF institute a stringent combustible loading control program and that additional seismic bracing and anchoring be provided for gloveboxes and heavy equipment.

Hans Jordan

2001-01-01T23:59:59.000Z

46

Allocating Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

47

Collaborative Requirements Engineering Project  

Science Conference Proceedings (OSTI)

... dependencies, safety, and environmental requirements) is essential to the ... Construction, and Operation of Constructed Facilities, March 2012. ...

2013-01-03T23:59:59.000Z

48

Emergency Medical Treatment Required  

E-Print Network (OSTI)

Emergency Medical Treatment Required Non-Emergency Medical Treatment Required If possible, get help present if possible OptaComp will complete the "First Report of Injury or Illness" and authorize medical Investigation Report" to Environmental Health & Safety within 48 hours Emergency Medical Treatment Required

Weston, Ken

49

FES Science Network Requirements  

E-Print Network (OSTI)

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

50

PIT Coating Requirements Analysis  

SciTech Connect

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

51

Evaluate deaerator steam requirements quickly  

Science Conference Proceedings (OSTI)

Steam plant engineers frequently have to perform energy balance calculations around the deaerator to estimate the steam required to preheat and deaerate the make-up water and condensate returns. This calculation involves solving two sets of equations, one for mass and the other for energy balance. Reference to steam tables is also necessary. However, with the help of this program written in BASIC, one can arrive at the make-up water and steam requirements quickly, without referring to steam tables. This paper shows the mass and energy balance equations for the deaerator. This paper gives the program listing. An number of condensate returns can be handled. An example illustrates the use of the program.

Ganapathy, V. (ABCO Industries, Inc., Abilene, TX (US))

1991-02-01T23:59:59.000Z

52

Transportation System Requirements Document  

SciTech Connect

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

1993-09-01T23:59:59.000Z

53

Mandatory Supervisory Training Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

54

Practical Estimates of Lake Evaporation  

Science Conference Proceedings (OSTI)

Practical estimates of lake evaporation must rely on data that can be observed in the land environment. This requires the ability to take into account the changes in the temperature and humidity that occur when the air passes from the land to the ...

F. I. Morton

1986-03-01T23:59:59.000Z

55

Management requirements for accreditation  

Science Conference Proceedings (OSTI)

... handbook, shall be defined in the quality manual. ... It is a fundamental requirement that the results ... NIST Handbook 150 (and ISO/IEC 17025) details ...

2013-08-20T23:59:59.000Z

56

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... need excellent situational awareness in order to do their jobs effectively. ... performance requirements as shown in Figure 2. This analysis was used ...

2013-03-13T23:59:59.000Z

57

CCI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for...

58

Public Safety Network Requirements  

Science Conference Proceedings (OSTI)

... Usage scenario. ... imposed by public safety applications and usage scenarios is key in ... requirements as shown in Figure 2. This analysis was used as ...

2010-10-05T23:59:59.000Z

59

ASCR Science Network Requirements  

E-Print Network (OSTI)

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD — April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

60

New Employee Training Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

All New Employees New Supervisors New Employee Training Requirements Welcome to Berkeley Lab We value you and the talents that you bring to our workplace. The training listed...

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Integrated Management Requirements mapping  

Science Conference Proceedings (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

62

Full SPP Partnership Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

63

Technical Safety Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

64

BES Science Network Requirements  

E-Print Network (OSTI)

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

65

NSLS II: Authentication Required  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Pages Login Access to this area of the NSLS-II website requires a valid username and password. Username: Password: Next > Last Modified: April 2, 2013 Please forward all...

66

Real time estimation of Bayesian networks  

Science Conference Proceedings (OSTI)

For real time evaluation of a Bayesian network when there is not sufficient time to obtain an exact solution, a guaranteed response time, approximate solution is required. It is shown that non traditional methods utilizing estimators based on an archive ...

Robert L. Welch

1996-08-01T23:59:59.000Z

67

Several test results on earthing-resistance-estimation instrument  

Science Conference Proceedings (OSTI)

Whenever earth construction work is done, the implanted number and depth of electrodes have to be estimated in order to obtain the required resistance value. We call this earth resistance estimation. Under conventional method of earth resistance estimation, ... Keywords: earthing-resistance estimation, resistivity sounding, soil layer

Hitoshi Kijima

2008-02-01T23:59:59.000Z

68

Estimated Global Hydrographic Variability  

Science Conference Proceedings (OSTI)

An estimate is made of the three-dimensional global oceanic temperature and salinity variability, omitting the seasonal cycle, both as a major descriptive element of the ocean circulation and for use in the error estimates of state estimation. ...

Gaël Forget; Carl Wunsch

2007-08-01T23:59:59.000Z

69

Base line estimation using sparse nonlinear operators  

Science Conference Proceedings (OSTI)

Efficient nonlinear operators for base line estimation of high energy physics detector signals are introduced. Due to the high processing rate requirements the operators are simplified using sparse input sequences. The operators are a sparse order statistic ... Keywords: base line estimation, filter training, order statistic filter

Sami J. Inkinen; Yrjö Neuvo

2002-05-01T23:59:59.000Z

70

Internal Dose Estimates from  

E-Print Network (OSTI)

Appendix F Internal Dose Estimates from NTS Fallout F-1 #12;Radiation Dose to the Population...........................................................................................40 Comparison to dose estimates from global fallout

71

Regulators, Requirements, Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

72

VFP: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

73

BER Science Network Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

74

SULI: Program Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

75

Federal Metering Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

76

Requirements engineering with ORM  

Science Conference Proceedings (OSTI)

The number of IT project overspends and failures suggest that many IT projects do not conform to requirements. Despite decades of development the IT industry still seems to lack an effective method of ensuring that a project will be right first time. ...

Ken Evans

2005-10-01T23:59:59.000Z

77

Requirements for Xenon International  

Science Conference Proceedings (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

78

Training requirements. - 19...  

NLE Websites -- All DOE Office Websites (Extended Search)

G H I J K L M N O P Q R S T U V W X Y Z www.OSHA.gov Regulations (Standards - 29 CFR) Training requirements. - 1926.454 Regulations (Standards - 29 CFR) - Table of Contents * Part...

79

NERSC Requirements Workshop November  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

80

Estimating Civilian Owned Firearms  

E-Print Network (OSTI)

Most of the world’s firearms are privately owned. 1 They include improvised craft guns as well as handguns, rifles, shotguns, and machine guns. The legal definition of a civilian firearm varies; some states allow civilian ownership of certain firearms that are restricted to military use in other states. The word civilian is used here to refer to actual possession, not legality. In 2007, the Small Arms Survey estimated the number of civilian firearm ownership worldwide at approximately 650 million weapons out of some 875 then in existence (see Figures 1 and 2). National ownership rates range from a high of 90 firearms per every 100 people in the United States, to one firearm or less for every 100 residents in countries like South Korea and Ghana (see Table 1). With the world’s factories delivering millions of newly manufactured firearms annually, and with far fewer being destroyed, civilian ownership is growing (Small Arms Survey, 2007, p. 39). Poor record-keeping and the near absence of reporting requirements for detailed information complicate assessments of global stockpiles of small arms and light weapons. When it comes to estimating civilian firearm ownership, differences in national gun culture —each country’s unique combination of historic and current sources of supply, laws and attitudes toward firearms ownership—often have distinct effects on the classification, ownership and perception of firearms. In addition, categories of firearm holders may overlap, as some individuals may use their private firearms at work as security guards, in armed groups, or in gangs.

unknown authors

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Support Requirements for Synfuels  

E-Print Network (OSTI)

Producing synfuels from coal is technically feasible. Projects have a high probability of success but risks do exist (technical, marketing, environmental delays, regulatory and political changes, etc.). The various segments of the developing synfuels industry are identified. For each segment its characteristics, uncertainties and risks are discussed, as well as the type of support of guarantee required to develop this portion of the synfuels industry.

Hyland, M. J.

1981-01-01T23:59:59.000Z

82

BER Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

83

BES Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

84

Repository seals requirements study  

SciTech Connect

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. This report presents the results of a repository sealing requirements study. Sealing is defined as the permanent closure of the shafts, ramps, and exploratory boreholes. Sealing includes those components that would reduce potential inflows above the repository, or that would divert flow near the repository horizon to allow vertical infiltration to below the repository. Sealing of such features as emplacement drifts was not done in this study because the current capability to calculate fracture flow into the drifts is not sufficiently mature. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

85

Statistics of Sxy Estimates  

Science Conference Proceedings (OSTI)

The statistics of Sxy estimates derived from orthogonal-component measurements are examined. Based on results of Goodman, the probability density function (pdf) for Sxy(f) estimates is derived, and a closed-form solution for arbitrary moments of ...

M. H. Freilich; S. S. Pawka

1987-10-01T23:59:59.000Z

86

Cost Estimation Recommendations  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

87

Repository seals requirement study  

Science Conference Proceedings (OSTI)

The Yucca Mountain Site Characterization Project, managed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating Contractor (M and O) is conducting investigations to support the Viability Assessment and the License Application for a high-level nuclear waste repository at Yucca Mountain, Nevada. The sealing subsystem is part of the Yucca Mountain Waste Isolation System. The Yucca Mountain Site Characterization Project is currently evaluating the role of the sealing subsystem (shaft, ramp and exploratory borehole seals) in achieving the overall performance objectives for the Waste Isolation System. This report documents the results of those evaluations. The objective of the study is to provide water or air flow performance based requirements for shafts, ramps, and exploratory boreholes located near the repository. Recommendations, as appropriate, are provided for developing plans, seals component testing, and other studies relating to sealing.

NONE

1997-11-03T23:59:59.000Z

88

DOE G 430.1-1 Chp 4, Types of Cost Estimates  

Directives, Delegations, and Requirements

The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

1997-03-28T23:59:59.000Z

89

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

90

ASCR Science Network Requirements  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

91

Software Requirements Specification Verifiable Fuel Cycle Simulation (VISION) Model  

SciTech Connect

The purpose of this Software Requirements Specification (SRS) is to define the top-level requirements for a Verifiable Fuel Cycle Simulation Model (VISION) of the Advanced Fuel Cycle (AFC). This simulation model is intended to serve a broad systems analysis and study tool applicable to work conducted as part of the AFCI (including costs estimates) and Generation IV reactor development studies.

D. E. Shropshire; W. H. West

2005-11-01T23:59:59.000Z

92

Interim Report for Advanced Topology Estimator Project  

Science Conference Proceedings (OSTI)

The Advanced Topology Estimator is a critical component in an overall system that will allow operational models of large-scale interconnections to be built, validated, and maintained with a fraction of the time and effort required by traditional electricity management system (EMS) tools. This document provides an interim report on the development of the EPRI Advanced Topology Estimator, which will interface to the EPRI Control Center Application Program (CCAPI) Common Information Model (CIM).

2001-12-20T23:59:59.000Z

93

Conductor requirements for high-temperature superconducting utility power transformers  

Science Conference Proceedings (OSTI)

High-temperature superconducting (HTS) coated conductors in utility power transformers must satisfy a set of operating requirements that are driven by two major considerations-HTS transformers must be economically competitive with conventional units, and the conductor must be robust enough to be used in a commercial manufacturing environment. The transformer design and manufacturing process will be described in order to highlight the various requirements that it imposes on the HTS conductor. Spreadsheet estimates of HTS transformer costs allow estimates of the conductor cost required for an HTS transformer to be competitive with a similarly performing conventional unit.

Pleva, E. F. [Waukesha Electric Systems, Waukesha, WI; Mehrotra, V. [Waukesha Electric Systems, Waukesha, WI; Schwenterly, S W [ORNL

2010-01-01T23:59:59.000Z

94

Frequency Tracking and Parameter Estimation for Robust Quantum State-Estimation  

E-Print Network (OSTI)

In this paper we consider the problem of tracking the state of a quantum system via a continuous measurement. If the system Hamiltonian is known precisely, this merely requires integrating the appropriate stochastic master equation. However, even a small error in the assumed Hamiltonian can render this approach useless. The natural answer to this problem is to include the parameters of the Hamiltonian as part of the estimation problem, and the full Bayesian solution to this task provides a state-estimate that is robust against uncertainties. However, this approach requires considerable computational overhead. Here we consider a single qubit in which the Hamiltonian contains a single unknown parameter. We show that classical frequency estimation techniques greatly reduce the computational overhead associated with Bayesian estimation and provide accurate estimates for the qubit frequency

Jason F. Ralph; Kurt Jacobs; Charles D. Hill

2009-07-29T23:59:59.000Z

95

Match Pumps to System Requirements  

SciTech Connect

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

2005-10-01T23:59:59.000Z

96

How the Carbon Emissions Were Estimated  

U.S. Energy Information Administration (EIA) Indexed Site

How the Carbon Emissions Were Estimated How the Carbon Emissions Were Estimated How the Carbon Emissions Were Estimated Carbon dioxide emissions are the main component of greenhouse gas emissions caused by human activity. Carbon dioxide is emitted mostly as a byproduct of the combustion of fossil fuels for energy, although certain industrial processes (e.g., cement manufacture) also emit carbon dioxide. The estimates of energy-related carbon emissions require both data on the energy use and carbon emissions coefficients relating energy use to the amount of carbon emitted. The Energy Information Administration (EIA) is the main source of data on U.S. energy use. Emissions of Greenhouse Gases in the United States 1998 used annual data provided by energy suppliers. However, to obtain more detail on how different sectors use energy, the emissions estimates in Energy and GHG Analysis rely data from on surveys of energy users, such as manufacturing establishments and commercial buildings.

97

Derived Annual Estimates  

U.S. Energy Information Administration (EIA) Indexed Site

For Methodology Concerning the Derived Estimates Total Consumption of Offsite-Produced Energy for Heat and Power by Industry Group, 1988-1998 Total Energy *** Electricity ***...

98

Derived Annual Estimates  

U.S. Energy Information Administration (EIA) Indexed Site

For Methodology Concerning the Derived Estimates Total Consumption of Offsite-Produced Energy for Heat and Power by Industry Group, 1974-1988 Total Energy *** Electricity ***...

99

Estimating Corn Grain Yields  

E-Print Network (OSTI)

This publication explains how to estimate the grain yield of a corn crop before harvest. An interactive grain yield calculator is included. 6 pages, 3 tables, 1 figure.

Blumenthal, Jurg M.; Thompson, Wayne

2009-06-12T23:59:59.000Z

100

Estimating frequency of change  

Science Conference Proceedings (OSTI)

Many online data sources are updated autonomously and independently. In this article, we make the case for estimating the change frequency of data to improve Web crawlers, Web caches and to help data mining. We first identify various scenarios, where ... Keywords: Change frequency estimation, Poisson process

Junghoo Cho; Hector Garcia-Molina

2003-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Requirements dependencies: the emergence of a requirements network  

Science Conference Proceedings (OSTI)

We believe that the requirements at the leaf-node level of the requirements tree structure cannot be viewed in isolation and that dependencies between them exist. We pursued this notion in order to find a coherent set of requirement dependencies that ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

102

Measurement campaigns for holdup estimation  

SciTech Connect

The derivation of technically defensible holdup estimates is described. Considerations important in the planning of measurement campaigns to provide necessary data are reviewed and the role of statistical sampling is discussed. By design, the presentation is nonmathematical and intended for a general audience. Though clearly important, use of sampling principles in the planning of holdup-related activities is sometimes viewed with apprehension. Holdup is often poorly understood to begin with, and the incorporation of the esoteric matters only adds to an image problem. Unfortunately, there are no painless options. In many operating facilities, surface areas on which holdup has accumulated amount to many square miles. It is not practical to pursue 100% measurement of all such surface areas. Thus, some portion is measured - constituting a ''sample,'' whether obtained by a formal procedure or not. Understanding the principles behind sampling is important in planning and in developing legitimate holdup estimates. Although derivation of legitimate, facility-wide holdup estimates is not currently mandated by Department of Energy regulatory requirements, the related activities would greatly advance the present state of knowledge.

Picard, R.R. (Los Alamos National Lab., Los Alamos, NM (US))

1988-07-01T23:59:59.000Z

103

How Far is Far Enough?: The Fetch Requirements for Micrometeorological Measurement of Surface Fluxes  

Science Conference Proceedings (OSTI)

Recent model estimates of the flux footprint are used to examine the fetch requirements for accurate micro-meteorological measurement of surface fluxes of passive, conservative scalars within the surface flux layer. The required fetch is ...

T. W. Horst; J. C. Weil

1994-08-01T23:59:59.000Z

104

4.5 Audit Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Requirements Audit Requirements Audit requirements are now contained in 2 separate sub-sections. Subsection 4.5.1 contains the audit requirements for States, Local Governments and Non-Profit Organizations while subsection 4.5.2 contains the audit requirements for For-Profit Organizations. 4.5.1 Audit Requirements for States, Local Governments and Non-Profit Organizations (a) General. All States, Local Governments and Non-Profit Organizations that expend over $500,000 in Federal funds in any year are required to have a single audit conducted in accordance with OMB Circular A-133. This requirement flows down to subrecipients that meet the dollar threshold. An independent auditor shall perform the audit in accordance with the Government Auditing Standards and must: 1) audit and provide opinions on the fair presentation of the

105

SG Network System Requirements Specification  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

106

Cost Estimating Handbook for Environmental Restoration  

Science Conference Proceedings (OSTI)

Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

NONE

1990-09-01T23:59:59.000Z

107

Building security requirements with CLASP  

Science Conference Proceedings (OSTI)

Traditionally, security requirements have been derived in an ad hoc manner. Recently, commercial software development organizations have been looking for ways to produce effective security requirements.In this paper, we show how to build security ... Keywords: application security, security process, security requirements

John Viega

2005-07-01T23:59:59.000Z

108

Estimating local thickness for finite element analysis  

Science Conference Proceedings (OSTI)

Within the development of motor vehicles, crash safety is one of the most important attributes. To comply with the ever increasing requirements of shorter cycle times and costs reduction, car manufacturers keep intensifying the use of virtual development ... Keywords: FEA mesh, automotive crash simulations, ray tracing, structural modelling, thickness estimation

Vânio Ferreira; Luís Paulo Santos; Ricardo Simoes; Markus Franzen; Omar O. Ghouati

2010-11-01T23:59:59.000Z

109

Estimating Renewable Energy Costs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimating Renewable Energy Costs Estimating Renewable Energy Costs Estimating Renewable Energy Costs October 16, 2013 - 4:40pm Addthis Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically require large, additional capital investments with savings accruing over the project's life. It is crucial that these systems are considered early on in the budgeting process. Early budget requests need to include a set of technologies that could be used to meet the project's design requirements and their associated implementation costs. The design team may respond with a different set of feasible technologies, but it is wise to have an existing placeholder in the budget. Federal agencies can continue to update the budget as decisions

110

State Emissions Estimates  

Gasoline and Diesel Fuel Update (EIA)

Estimates of state energy-related carbon dioxide emissions Estimates of state energy-related carbon dioxide emissions Because energy-related carbon dioxide (CO 2 ) constitutes over 80 percent of total emissions, the state energy-related CO 2 emission levels provide a good indicator of the relative contribution of individual states to total greenhouse gas emissions. The U.S. Energy Information Administration (EIA) emissions estimates at the state level for energy-related CO 2 are based on data contained in the State Energy Data System (SEDS). 1 The state-level emissions estimates are based on energy consumption data for the following fuel categories: three categories of coal (residential/commercial, industrial, and electric power sector); natural gas; and ten petroleum products including-- asphalt and road oil, aviation gasoline, distillate fuel, jet fuel, kerosene, liquefied petroleum gases

111

Radiation Stress Estimators  

Science Conference Proceedings (OSTI)

The radiation stresses Sij associated with the propagation of wind-generated waves are principal driving forces for several important surf-zone processes. The accurate estimation of the onshore flux of longshore-directed mean momentum Syx, using ...

S. S. Pawka; D. L. Inman; R. T. Guza

1983-09-01T23:59:59.000Z

112

Data Requirements from NERSC Requirements Reviews Richard Gerber...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Scientists represented by the NERSC user community have growing requirements for data storage, IO bandwidth, networking bandwidth, and data software and services. Over the...

113

Guidelines for Estimating Unmetered Landscapting Water Use  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidelines for Estimating Guidelines for Estimating Unmetered Landscaping Water Use July 2010 i Summary Executive Order 13514 requires Federal agencies to develop a baseline for industrial, landscaping, and agricultural water use in fiscal year 2010. Measuring actual water use through flow meters is the best method to develop this baseline. But there are instances where Federal sites do not meter these applications, so developing a baseline will be problematic. Therefore the intent of this document is to assist Federal agencies in the baseline development by providing a methodology to calculate unmetered sources of landscaping water use utilizing engineering estimates. The document lays-out step by step instructions to estimate landscaping water using two alternative

114

Attribution and Apportionment - Preliminary Estimation Procedures  

NLE Websites -- All DOE Office Websites (Extended Search)

Preliminary Estimation Procedures Preliminary Estimation Procedures FHWA completes several steps in the motor fuel analysis process prior to beginning the annual State-by-State analysis. These steps include an estimation of non-highway fuel uses, public fuel uses, and gasohol consumption. The estimation models are briefly described below. The models require data from several outside sources. One major dataset is the Census Bureau's Vehicle Inventory and Use Survey (VIUS). This data set contains information on annual vehicle miles of travel, percent of off-road use, major use of the truck (agriculture, retail, etc.), engine type, and the State in which the truck is registered. VIUS does not, however, provide a fuel use breakdown between gasoline and gasohol, on-road versus off-road fuel economy, or a distribution of off-road travel by State. The VIUS is conducted every five years; the latest survey was in 1997.

115

Query Selectivity Estimation for Uncertain Data  

E-Print Network (OSTI)

Abstract. Applications requiring the handling of uncertain data have led to the development of database management systems extending the scope of relational databases to include uncertain (probabilistic) data as a native data type. New automatic query optimizations having the ability to estimate the cost of execution of a given query plan, as available in existing databases, need to be developed. For probabilistic data this involves providing selectivity estimations that can handle multiple values for each attribute and also new query types with threshold values. This paper presents novel selectivity estimation functions for uncertain data and shows how these functions can be integrated into PostgreSQL to achieve query optimization for probabilistic queries over uncertain data. The proposed methods are able to handle both attribute- and tuple-uncertainty. Our experimental results show that our algorithms are efficient and give good selectivity estimates with low space-time overhead. 1

Sarvjeet Singh; Chris Mayfield; Rahul Shah; Sunil Prabhakar; Susanne Hambrusch

2008-01-01T23:59:59.000Z

116

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

117

Project X functional requirements specification  

SciTech Connect

Project X is a multi-megawatt proton facility being developed to support intensity frontier research in elementary particle physics, with possible applications to nuclear physics and nuclear energy research, at Fermilab. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions. This paper will describe the Functional Requirements for the Project X facility and the rationale for these requirements.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Mishra, S.; Nagaitsev, S.; Tschirhart, R.; /Fermilab

2011-03-01T23:59:59.000Z

118

Direct labor requirements for select solar energy technologies: a review and synthesis. SERI working paper  

DOE Green Energy (OSTI)

Various estimates of the labor requirements for the design, manufacture, installation, and maintenance of space heating and domestic hot water systems are presented. Total projected job requirements by year, calculated by multiplying person-hours per system times market penetration estimates, are provided. Limitations of previous studies and conclusions about needed research are discussed. (MHR)

Mason, B.; Armington, K.

1978-08-01T23:59:59.000Z

119

Requirements Specifications For Hybrid Systems  

E-Print Network (OSTI)

this paper is to present a formal framework for representing and reasoning about the requirements of hybrid systems. As background, the paper briefly reviews an abstract model for specifying system and software requirements, called the Four Variable Model [12], and a related requirements method, called SCR (Software Cost Reduction) [10, 1]. The paper then introduces a special discrete version of the Four Variable Model, the SCR requirements model [8] and proposes an extension of the SCR model for specifying and reasoning about hybrid systems. 2 Background

Constance Heitmeyer

1996-01-01T23:59:59.000Z

120

Estimates of Power Consumed by Mixing in the Ocean Interior  

Science Conference Proceedings (OSTI)

Much attention has focused on the power required for driving mixing processes in the ocean interior, the thermohaline circulation, and the related meridional overturning circulation (MOC). Recent estimates range from roughly 0.5 to 2 TW (1 TW = 1 ...

Louis St. Laurent; Harper Simmons

2006-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The “Shukla–Gutzler” Method for Estimating Potential Seasonal Predictability  

Science Conference Proceedings (OSTI)

This paper reexamines a procedure proposed by Shukla and Gutzler for estimating potential seasonal predictability. Certain subtle and unverified assumptions required for the method to work are clarified, and Monte Carlo experiments are used to ...

Timothy DelSole; Xia Feng

2013-02-01T23:59:59.000Z

122

Lane estimation for autonomous vehicles using vision and LIDAR  

E-Print Network (OSTI)

Autonomous ground vehicles, or self-driving cars, require a high level of situational awareness in order to operate safely and eciently in real-world conditions. A system able to quickly and reliably estimate the location ...

Huang, Albert Shuyu

2010-01-01T23:59:59.000Z

123

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by students who start during or after the Spring 2012 semester is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

124

Handbook of Academic Requirements & Procedures  

E-Print Network (OSTI)

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

Kounaves, Samuel P.

125

Humidity requirements in WSCF Laboratories  

SciTech Connect

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

126

MINIMUM SECURITY REQUIREMENTS FOR FEDERAL  

E-Print Network (OSTI)

March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

127

REQUESTS FOR RETIREMENT ESTIMATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REQUEST FOR RETIREMENT ANNUITY ESTIMATE REQUEST FOR RETIREMENT ANNUITY ESTIMATE Instructions: Please read and answer the following questions thoroughly to include checking all applicable boxes. Unanswered questions may delay processing. Print and Fax back your request form to 202.586.6395 or drop request to GM-169. The request will be assigned to your servicing retirement specialist. They will confirm receipt of your request. SECTION A Request Submitted _____________________ ______________________ ________________________ _____________________ Name (last, first, middle) Last four SSN Date of Birth ___________________________ _________________________ __________________________ Organization Office Telephone Number Fax Number

128

Iterative phase estimation  

E-Print Network (OSTI)

We give an iterative algorithm for phase estimation of a parameter theta, which is within a logarithmic factor of the Heisenberg limit. Unlike other methods, we do not need any entanglement or an extra rotation gate which can perform arbitrary rotations with almost perfect accuracy: only a single copy of the unitary channel and basic measurements are needed. Simulations show that the algorithm is successful. We also look at iterative phase estimation when depolarizing noise is present. It is seen that the algorithm is still successful provided the number of iterative stages is below a certain threshold.

Caleb J O'Loan

2009-04-22T23:59:59.000Z

129

A lightweight 256-bit hash function for hardware and low-end devices: lesamnta-LW  

Science Conference Proceedings (OSTI)

This paper proposes a new lightweight 256-bit hash function Lesamnta-LW with claimed security levels of at least 2120 with respect to collision, preimage, and second preimage attacks. We adopt the Merkle-Damgård domain extension; the compression ... Keywords: hash functions, lightweight cryptography, security reduction proofs

Shoichi Hirose; Kota Ideguchi; Hidenori Kuwakado; Toru Owada; Bart Preneel; Hirotaka Yoshida

2010-12-01T23:59:59.000Z

130

Time of arrival and power delay profile estimation for IR-UWB systems  

Science Conference Proceedings (OSTI)

In time of arrival (TOA) estimation of received ultra-wideband (UWB) pulses, traditional maximum likelihood (ML) and generalized likelihood estimators become impractical because they require sampling at the Nyquist rate. Sub-Nyquist ML-based TOA estimation ... Keywords: Average power delay profile (APDP), Radio frequency identification (RFID), Source localization, Time of arrival (TOA) estimation, Ultra-wideband (UWB) pulse signals

Fang Shang; Benoit Champagne; Ioannis Psaromiligkos

2013-05-01T23:59:59.000Z

131

Brief paper: Estimation of the disturbance structure from data using semidefinite programming and optimal weighting  

Science Conference Proceedings (OSTI)

Designing a state estimator for a linear state-space model requires knowledge of the characteristics of the disturbances entering the states and the measurements. In [Odelson, B. J., Rajamani, M. R., & Rawlings, J. B. (2006). A new autocovariance least ... Keywords: Covariance estimation, Minimum independent disturbances, Minimum variance estimation, Semidefinite programming, State estimation

Murali R. Rajamani; James B. Rawlings

2009-01-01T23:59:59.000Z

132

Battery Life Estimator Manual Linear Modeling and Simulation  

DOE Green Energy (OSTI)

The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

2009-08-01T23:59:59.000Z

133

Battery Calendar Life Estimator Manual Modeling and Simulation  

SciTech Connect

The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

2012-10-01T23:59:59.000Z

134

Cost estimate guidelines for advanced nuclear power technologies  

SciTech Connect

To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs.

Delene, J.G.; Hudson, C.R. II.

1990-03-01T23:59:59.000Z

135

External Dose Estimates from  

E-Print Network (OSTI)

Appendix E External Dose Estimates from NTS Fallout E-1 #12;External Radiation Exposure as the dependence on fallout time of arrival. The most exposed individuals were outdoor workers; the least exposed was about a factor of 20 less than that from "global fallout" from high- yield weapons tests carried out

136

External Dose Estimates from  

E-Print Network (OSTI)

Appendix G External Dose Estimates from Global Fallout G-1 #12;External Radiation Exposure from the fallout from all of these tests was about 0.7 mSv, about equivalent to 2-3 years of external radiation exposure from natural background. In contrast to the fallout from tests at the Nevada Test site

137

EPA Revises Emissions Estimation Methodology  

U.S. Energy Information Administration (EIA)

The changes to the historical emission estimates are the result of revisions to the data and estimation ... b K.D . Smythe, RAND ... RAND Environmental Science and ...

138

Home: Directives, Delegations, and Requirements  

NLE Websites -- All DOE Office Websites

content. | Skip to navigation content. | Skip to navigation Site Map Contact Us Current Documents Archived Documents Entire Site only in current section Advanced Search... U.S. Department of Energy Office of Management Directives, Delegations, and Requirements Sections Home Directives Current Directives Draft Directives Archives Delegations Current Delegations Current Designations Rescinded Organizations' Assignment of Responsibility Development & Review RevCom Writers' Tools DPC Corner References News and Updates Help Personal tools You are here: Office of Management » Directives, Delegations, and Requirements Info Home Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directive

139

Cyber Security Issues and Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program (SGIG) Cyber Security Issues and Requirements Jeff Dagle November 19, 2009 Communication and Information Technology will be Central to Smart Grid Deployment Final Interim Smart Grid Roadmap, prepared by the Electric Power Research Institute (EPRI) for the National Institute of Standards and Technology (NIST) Cyber Security Requirements Associated with ARRA Projects Proposals were required to include:  Discussion of how cyber security risks will be mitigated  What criteria will be used for vendor and technology selection  Relevant cyber security standards that will be followed (or industry best practices)  How emerging smart grid cyber security standards that are currently being developed will be adopted Cyber Security Objectives for Smart

140

The Practice of Parking Requirements  

E-Print Network (OSTI)

the cost of the required parking is thus $20 per square foot$40 per square foot of floor area, or twice the cost in aper 1,000 square feet in a TOD, and the developer's cost of

Shoup, Donald C.

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

land requirements | OpenEI  

Open Energy Info (EERE)

requirements requirements Dataset Summary Description This dataset is part of a larger internal dataset at the National Renewable Energy Laboratory (NREL) that explores various characteristics of large solar electric (both PV and CSP) facilities around the United States. This dataset focuses on the land use characteristics for solar facilities that are either under construction or currently in operation. Source Land-Use Requirements for Solar Power Plants in the United States Date Released June 25th, 2013 (5 months ago) Date Updated Unknown Keywords acres area average concentrating solar power csp Density electric hectares km2 land land requirements land use land-use mean photovoltaic photovoltaics PV solar statistics Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon Master Solar Land Use Spreadsheet (xlsx, 1.5 MiB)

142

Manifest requirements. RCRA Information Brief  

Science Conference Proceedings (OSTI)

Specific pretransport regulatory requirements must be met by DOE prior to shipment of hazardous waste, low-level wastes (LLW), and radioactive mixed wastes (RMW). The pretransport requirements are intended to help reduce the risk of loss or leakage of, or exposure to, hazardous wastes, LLW, and RMW during shipment; and to communicate information on potential hazards to shippers, carriers, or receivers of waste shipments, and emergency response personnel in the event of an accident, spill, or leak. These goals are accomplished through tracking of shipments, correct packaging and labeling, and communication of potential hazards. Specific requirements include manifesting, packaging, marking and labeling of waste packages, placarding of vehicles, and selecting appropriate waste transporters and shipment destinations. This Information Brief focuses on the manifesting requirements associated with domestic transport of hazardous wastes, LLW, and RMW.

Not Available

1994-04-01T23:59:59.000Z

143

Physics and detector simulation requirements  

Science Conference Proceedings (OSTI)

‘‘This document describes the computing environment needed to meet the requirements for high energy physics Monte Carlo Calculations for the simulation of Superconducting Super Collider Laboratory physics and detectors.’’ (AIP)

Computer Acquisition Working Group

1990-01-01T23:59:59.000Z

144

SofTV Viewer Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

may be required to view all features in a presentations where build steps and animations are published. (This feature can be turned off) Netscape 7.1+ Presentations created...

145

OpenEI - land requirements  

Open Energy Info (EERE)

en.openei.orgdatasetstaxonomyterm4180 en Land use requirements for ground-mounted solar power facilities. http:en.openei.orgdatasetsnode454

This dataset is part of...

146

Fusion technology status and requirements  

SciTech Connect

This paper summarizes the status of fusion technology and discusses the requirements to be met in order to build a demonstration fusion plant. Strategies and programmatic considerations in pursuing engineering feasibility are also outlined.

Thomassen, K.I.

1982-01-26T23:59:59.000Z

147

Renewable Energy Requirement Status: 2005  

Science Conference Proceedings (OSTI)

The potential impacts of renewable portfolio standards (RPS) and other requirements are significant for electricity generation, transmission, and distribution companies, especially for those that depend on coal and other fossil fuels to supply the power delivered to their customers. this Technical Update is to update the information presented in the previous EPRI report, Renewable Energy Requirement Status and Compliance Strategies: 2004 (1008374, December 2004). Although the assessment focuses on state ...

2006-03-30T23:59:59.000Z

148

Functional Requirements for Customer Communications  

Science Conference Proceedings (OSTI)

Customer communications infrastructures could support a wide variety of useful utility operations and industry-wide applications. However, these systems will require a substantial investment, which necessitates viewing customer communications with multiple stakeholders and applications in mind. This report describes the development of requirements for customer interface applications such as revenue metering, communications gateways, and remote equipment operations that can provide the basis for powerful ...

2002-12-18T23:59:59.000Z

149

GAO Cost Estimating and Assessment Guide  

E-Print Network (OSTI)

The U.S. Government Accountability Office is responsible for, among other things, assisting the Congress in its oversight of the federal government, including agencies ’ stewardship of public funds. To use public funds effectively, the government must meet the demands of today’s changing world by employing effective management practices and processes, including the measurement of government program performance. In addition, legislators, government officials, and the public want to know whether government programs are achieving their goals and what their costs are. To make those evaluations, reliable cost information is required and federal standards have been issued for the cost accounting that is needed to prepare that information. 1 We developed the Cost Guide in order to establish a consistent methodology that is based on best practices and that can be used across the federal government for developing, managing, and evaluating capital program cost estimates. For the purposes of this guide, a cost estimate is the summation of individual cost elements, using established methods and valid data, to estimate the future costs of a program, based on what is known today. 2 The management of a cost estimate involves continually updating the estimate with actual data as they become available, revising the estimate to reflect changes, and analyzing differences between estimated and actual costs—for example, using data from a reliable earned value management (EVM) system. 3 The ability to generate reliable cost estimates is a critical function, necessary to support the Office of Management and Budget’s (OMB) capital programming process. 4 Without this ability, agencies are at risk of experiencing cost overruns, missed deadlines, and performance shortfalls—all recurring problems that our program assessments too often reveal. Furthermore, cost increases often mean that the government

Best Practices For Developing

2009-01-01T23:59:59.000Z

150

NPP Estimation for Grasslands  

NLE Websites -- All DOE Office Websites (Extended Search)

NPP for Grasslands NPP for Grasslands Introduction The Oak Ridge DAAC Net Primary Production (NPP) Database includes field measurements from grassland study sites worldwide. The following brief review and discussion is intended to explain the complexity of NPP estimates derived from grassland measurements. There is no single answer to the question, "What is the productivity of the ecosystem at study site A?"; rather there may be range of estimates of NPP, depending upon what data were actually collected and how these data are processed. Although some of these methods for determining NPP for grasslands may be applicable to other vegetation types (e.g., semi-deserts, tundra, or some crops), methods for forests, in particular, are significantly different. Nevertheless, it should be possible to answer the question, "Is this modelled value of NPP reasonable for this ecosystem type at this location?"

151

NETL: News Release - DOE Estimates Future Freshwater Needs to Meet  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2006 5, 2006 DOE Estimates Future Freshwater Needs to Meet Thermoelectric Power Demand New Analysis Examines Regional Differences in Freshwater Needs, Provides Baseline for Measuring Research Progress WASHINGTON, DC - In support of an emerging energy-water research program, the U.S. Department of Energy's National Energy Technology Laboratory (NETL) has updated its groundbreaking 2004 study estimating future freshwater requirements for the U.S. thermoelectric generation sector. Bringing a much-needed regional focus, the new report, Estimating Freshwater Needs to Meet Future Thermoelectric Generation Requirements, identifies a dichotomy between national and local freshwater needs and pinpoints where critical water issues could develop. MORE INFO Read the report

152

Energy efficiency capital requirements for buildings in the United States  

SciTech Connect

Estimates of energy savings for any national energy efficiency or environmental improvement program should be based on a reasonable understanding of how much of the market can be served by such a program and what is the total value of investment required (capital requirements) to accomplish the savings claimed by the program. Current information on the energy savings performance and capital requirements of large-scale energy efficiency programs is used to develop a simple framework for analysis of capital requirements and the size of markets (dollar value of the markets) to compare with proposed new initiatives or programs. The comparison provides a reality check on the energy savings claimed. Based on this framework, current energy efficiency efforts and estimates of @p for proposed initiatives are examined. The examination shows that, in the United States, investment requirements for achieving claimed national energy savings goals should be estimated more consistently and that constraints related to the dollar volume of markets do not appear to be considered adequately. The analysis framework is used to show that major growth in costing energy efficiency markets is needed, and that simple reliance on existing approaches such as current utility DSM programs will not be adequate to reach proposed goals. Any nation serious about achieving needed energy use reductions in buildings should have reliable information about the costs of and increase in market size needed for achieving reduction goals. The analysis framework presented here will help improve that reliability.

MacDonald, M.

1994-12-31T23:59:59.000Z

153

Operated device estimation framework  

E-Print Network (OSTI)

Protective device estimation is a challenging task because there are numerous protective devices present in a typical distribution system. Among various protective devices, auto-reclosers and fuses are the main overcurrent protection on distribution systems. Operation of a protective device in response to a particular fault condition depends upon the protective device’s operating behavior and coordination of various such protective devices. This thesis presents the design and implementation of a protective device estimation algorithm which helps in identifying which protective devices have operated to clear a short circuit condition. The algorithm uses manufacturer’s device details, power quality data measured from substation monitoring devices and power system event features estimated using existing DFA algorithms. The proposed technique can be used to evaluate coordination of these protective devices and helps in locating a fault in a distribution system feeder. This approach is independent of feeder topology and could be readily used for any distribution system. The effectiveness of this algorithm is verified by simulated and actual test data. Suggestions are included for future research and application by electric utilities.

Rengarajan, Janarthanan

2008-12-01T23:59:59.000Z

154

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network (OSTI)

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process generally lacks structure and definition as compared to other areas of cost estimation; and 2) there is a lack of integration and communication between those responsible for ROW cost estimating and those responsible for general project cost estimating. The research for this thesis was preceded by a literature review to establish the basis for the study. Data collection was completed through interviews of seven state highway agencies (SHAs) and two local public agencies (LPAs). The findings of the research are presented in a set of ROW flowcharts which document the steps, inputs, and outputs of the ROW cost estimation and cost estimate management process. Three ROW cost estimates and a cost management process take place throughout project development. An effort was made from the onset of the research to relate the ROW cost estimating and cost estimate management process to the first four project development phases (planning, programming. preliminary design, and final design). There are five flowcharts produced as a result of this research: 1) an agency-level flowchart showing all cost estimates and the interaction of ROW with the project development process; 2) a conceptual ROW cost estimating flowchart which depicts the required steps during planning; 3) a baseline ROW cost estimating flowchart which depicts the required steps during programming; 4) an update ROW cost estimating flowchart which depicts the required steps during preliminary design to include a cost estimate management loop; and 5) a ROW cost management flowchart which depicts the required steps during final design. Although selected SHA contacts provided input following the development of the flowcharts, the flowcharts were only validated to a limited extent due to time and budget constraints. These flowcharts attempt to address the two contributing problems to ROW cost escalation by providing structure to the ROW cost estimation process and by developing the ROW process flowcharts linked to the project development process. Based on the input provided by SHA contacts, the flowcharts appear to have the potential to provide guidance to SHAs in improving the accuracy of ROW cost estimates through addressing these two problems.

Lucas, Matthew Allen

2007-12-01T23:59:59.000Z

155

OMB Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OMB Requirements OMB Requirements OMB Requirements Acquisitions OMB Circular A-109, Acquisition of Major Systems (04-05-76) (Available in hard copy only) OMB M-04-08, Maximizing Use of SmartBuy and Avoiding Duplication of Agency Activities with with the President's 24 E-Gov Initiatives (02-25-2004) (pdf) OMB M-04-16, Software Acquisition (07-01-2004) Budget/Capital Planning OMB Circular A-11 OMB M-05-23, Improving Informational Technology (IT) Project Planning and Execution (8-04-2005) (pdf) Cyber Security & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information

156

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

157

New Solutions Require New Thinking  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions Require Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication systems * Demand response programs Reducing Peak Demand The RDSI program aims to reduce peak load on distribution feeders 20% by 2015. To help achieve this goal, RDSI is sponsoring demonstration projects nationwide. From California to New York, these projects are

158

Meeting Federal Energy Security Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Markel Markel SRA International Lawrence_Markel@sra.com Federal Utility Partnership Working Group Fall 2012 - October 16-17 Mobile, AL Sponsored by Alabama Power Theme Meeting energy security requirements in federal facilities provides opportunities for additional types of cooperation between utilities and the federal agencies. However, there are significant barriers to pursuing these opportunities - constraints on utilities and on federal agencies, as well as sometimes-competing objectives. Energy security encompasses sufficiency, surety, and sustainability.  Above all, energy security means having adequate power to conduct critical operations for the duration required (sufficiency).  Secondarily, and leading to sufficiency, is ensuring resilient energy supplies that are accessible when

159

Stellar Astrophysics Requirements NERSC Forecast  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements for Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis (Munich), Andrzej Odrzywolek (Cracow), Ju Zhang (FIT), Andrey Zhiglo (Kharkov) 1. m461: Stellar Explosions in Three Dimensions * Summarize your projects and expected scientific objectives through 2014 * Modeling and simulations of transient phenomena in stellar astrophysics driven by either radiation or thermonuclear processes * Numerical solution of a coupled system of PDEs and ODEs * Tame nonlinearity! * Our goal is to ... * Explain observed properties of exploding stellar objects * Present focus is ... * Neutrino-driven core-collapse supernova explosions * In the next 3 years we expect to ...

160

Estimation, Economic methodology  

E-Print Network (OSTI)

In this paper I analyse the main strengths and weaknesses of agent-based computational models. I first describe how agent-based simulations can complement more traditional modelling techniques. Then, I rationalise the main theoretical critiques against the use of simulation, which point to the following problematic areas: (i) interpretation of the simulation dynamics, (ii) estimation of the simulation model, and (iii) generalisation of the results. I show that there exist solutions for all these issues. Along the way, I clarify some confounding differences in terminology between the computer science and the economic literature.

Matteo Richiardi; Laboratorio Riccardo; Revelli Centre; Employment Studies; I’m Indebted Francesco Devicienti; Roberto Leombruni; Bruno Contini For Their

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ALLOCATION OF REACTIVE SUPPORT REQUIREMENTS  

E-Print Network (OSTI)

the voltage setting point s kV of each bus Qk and the voltage profile for the buses c j Q . Recall that Q for these transactions so that all bus voltages meet the specified voltage profile requirements. Consequently load is locally met at the bus. In other words, we assume that at each load bus the power factor is 1

Gross, George

162

Utility Savings Estimators | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

the Utility Savings Estimators: Commercial Estimator | Residential Estimator (These *.zip files contain the Microsoft Excel macro-enabled (*.xlsm) estimator files. You will...

163

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Neutron Source Network Requirements Six DOE laboratories arehas networking requirements which differ from many other DOEhas networking requirements which differ from many other DOE

2006-01-01T23:59:59.000Z

164

Estimation of the social costs of natural gas  

SciTech Connect

This study determines the extent to which it is possible to develop monetary estimates of the marginal social cost of fuels, using natural gas to test a methodology that could be applied to other fuels. This requires review of previous estimates of both market and nonmarket costs to the extent that such are available. For some components of social cost, calculation of estimates from secondary data is required. The feasibility of using these estimates to develop marginal social-cost estimates for the country and for states or regions must then be evaluated. In order to develop estimates of marginal social cost for use in determining minimum life-cycle costs of building space conditioning, economic theory is used to develop a conceptual model of the market cost of fuel extraction and conversion. Then, estimation methodologies for each component of nonmarket costs are examined to assess the applicability and validity of each methodology. On the basis of this analysis, empirical estimates of both market and nonmarket components of social cost are aggregated to calculate a social-cost estimate for natural gas. 38 references.

Nieves, L.A.; Lemon, J.R.

1979-12-01T23:59:59.000Z

165

Estimate HRSG performance quickly  

SciTech Connect

Heat recovery steam generators (HRSG) are coupled to a heat recovery source which exhausts hot gases, such as gas turbines, furnaces, kilns, etc., to generate steam for the plant's process or power needs. When two pieces of equipment are coupled, their performances may not match their respective design or maximum efficiency points due to varying plant load or steam demand. In addition, many plants require the HRSG to operate effectively over the entire operating range of the plant. In chemical and fertilizer plants, hot gas is cooled in the HRSG to the required limiting temperature. In plants using gas turbines, even ambient conditions will affect HRSG performance indirectly. So a plant engineer should be able to predict the HRSG performance at any design point called for by the plant's load or steam demand.

Kuppuraj, K.

1986-07-01T23:59:59.000Z

166

Estimation of the Mean Field Bias of Radar Rainfall Estimates  

Science Conference Proceedings (OSTI)

In this paper procedures are developed for estimating the mean field bias of radar rainfall estimates. Mean field bias is modeled as a random process that varies not only from storm to storm but also over the course of a storm. State estimates of ...

James A. Smith; Witold F. Krajewski

1991-04-01T23:59:59.000Z

167

Quality Assurance Requirements and Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QjCivilianRadioactive QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160 Successful implementation of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance (QA) program is essential for the OCRWM to carry out its mission. Our mission is to manage and dispose ofbigh-Ievel radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits

168

Nano-science Safety Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Nano-science Safety Requirements Effective Date 12/6/2011 Nano-science Safety Requirements Effective Date 12/6/2011 The only official copy of this file is the one on-line. Before using a printed copy, verify that it is the most current version by checking the effective date. Page 1 of 3 Prepared By: L. Stiegler Low Risk - Embedded or Fixed Nanostructures (nanomaterials, incapable as a practical matter, of becoming airborne) Ensure that fixed nanomaterials are not subjected to actions that may generate Unbound NanoParticles (UNP). * For work outside of a HEPA filtered exhaust hood: o No Mechanical stresses e.g., (grinding, scraping, or pressing). o No thermal stresses o Cover samples when practical e.g., (slide cover, Kapton tape, Mylar tape, or cellophane tape). Samples/container must be labeled if not used immediately.

169

Requirements for signaling channel authentication  

SciTech Connect

This contribution addresses requirements for ATM signaling channel authentication. Signaling channel authentication is an ATM security service that binds an ATM signaling message to its source. By creating this binding, the message recipient, and even a third party, can confidently verify that the message originated from its claimed source. This provides a useful mechanism to mitigate a number of threats. For example, a denial of service attack which attempts to tear-down an active connection by surreptitiously injecting RELEASE or DROP PARTY messages could be easily thwarted when authenticity assurances are in place for the signaling channel. Signaling channel authentication could also be used to provide the required auditing information for accurate billing which is impervious to repudiation. Finally, depending on the signaling channel authentication mechanism, end-to-end integrity of the message (or at least part of it) can be provided. None of these capabilities exist in the current specifications.

Tarman, T.D.

1995-12-11T23:59:59.000Z

170

Functional Requirements and Use Cases  

E-Print Network (OSTI)

iously also beneficial in information systems development, staging core functionality for early releases and adding features over the course of several subsequent releases. In many industries, companies produce product lines with different cost/feature variations per product in the line, and product families that include a number of product lines targeted at somewhat different markets or usage situations. What makes these product lines part of a family, are some common elements of functionality and identity. A platform-based development approach leverages this commonality, utilizing a set of reusable assets across the family. These strategies have important implications for software architecture. In particular, it is not just the functional requirements of the first product or release that must be supported by the architecture. The functional requirements of early (nearly concurrent) releases need to be explicitly taken into account. Later releases are accommodated through architectu

System Has Properties; Ruth Malan; Dana Bredemeyer

2005-01-01T23:59:59.000Z

171

Computer-intensive rate estimation, diverging statistics and scanning  

E-Print Network (OSTI)

A general rate estimation method is proposed that is based on studying the in-sample evolution of appropriately chosen diverging/converging statistics. The proposed rate estimators are based on simple least squares arguments, and are shown to be accurate in a very general setting without requiring the choice of a tuning parameter. The notion of scanning is introduced with the purpose of extracting useful subsamples of the data series; the proposed rate estimation method is applied to different scans, and the resulting estimators are then combined to improve accuracy. Applications to heavy tail index estimation as well as to the problem of estimating the long memory parameter are discussed; a small simulation study complements our theoretical results.

McElroy, Tucker

2007-01-01T23:59:59.000Z

172

Present and Future Computing Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computational Cosmology for Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical Program Review November 27-28, 2012

173

Estimation of CO2 injection well requirements into saline aquifers for pre-feasibility CCS economics.  

E-Print Network (OSTI)

??Sub-surface saline aquifers are candidates as CO2 injection sites because they could have significant storage potential. One of the long-standing issues in assessing such storage… (more)

Bukhteeva, Olga

2012-01-01T23:59:59.000Z

174

Estimating Flexibility Requirements in a Demand-Driven Lean/JIT Environment  

Science Conference Proceedings (OSTI)

Demand-driven JIT manufacturing is based on the assumption of a level stable demand rate. This is however not the reality experienced by most companies. To handle fluctuations from a level stable demand rate, the manufacturing system needs flexibility. ... Keywords: JIT, capacity matching, flexibility

Peter Nielsen; Kenn Steger-Jensen

2008-06-01T23:59:59.000Z

175

Empirical Methods of Cost Estimation  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

176

Optimal estimation with limited measurements  

Science Conference Proceedings (OSTI)

This paper introduces a sequential estimation problem with two decision makers, or agents, who work as members of a team. One of the agents sits at an observation post, and makes sequential observations about the state of an underlying stochastic process ... Keywords: WSNs, limited information, networked control systems, optimal estimation, real-time control, real-time monitoring, recursive estimation, sequential estimation, wireless networks, wireless sensor networks

Orhan C. Imer; Tamer Basar

2010-01-01T23:59:59.000Z

177

Prediction of power requirements for a longwall armored face conveyor  

SciTech Connect

Longwall armored face conveyors (AFC`s) have traditionally been designed using a combination of heuristics and simple models. However, as longwalls increase in length, these design procedures are proving to be inadequate. The result has either been a costly loss of production due to AFC stalling or component failure, or larger than necessary capital investment due to overdesign. In order to allow accurate estimation of the power requirements for an AFC, this paper develops a comprehensive model of all the friction forces associated with the AFC. Power requirement predictions obtained from these models are then compared with measurements from two mine faces.

Broadfoot, A.R. [Ampcontrol Pty. Ltd., Newcastle, New South Wales (Australia)] [Ampcontrol Pty. Ltd., Newcastle, New South Wales (Australia); Betz, R.E. [Univ. of Newcastle, Callaghan, New South Wales (Australia). Dept. of Electrical and Computer Engineering] [Univ. of Newcastle, Callaghan, New South Wales (Australia). Dept. of Electrical and Computer Engineering

1997-01-01T23:59:59.000Z

178

Outlook and Related Information Requirements  

E-Print Network (OSTI)

This procedure provides the steps required for market participants to submit the information required for the 18-Month Outlook, and specifies the information to be contained in the Outlook. Public Disclaimer The posting of documents on this Web site is done for the convenience of market participants and other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all posted documents conform to the original, changes can result from the original, including changes resulting from the programs used to format the documents for posting on the Web site as well as from the programs used by the viewer to download and read the documents. The IESO makes no representation or warranty, express or implied, that the documents on this Web site are exact reproductions of the original documents listed. In addition, the documents and information posted on this Web site are subject to change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion without further notice. It is solely your responsibility to ensure that you are using up-to-date documents and information.

unknown authors

2001-01-01T23:59:59.000Z

179

Title, Location, Document Number Estimated Cost Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Title, Location, Document Number Estimated Cost Description EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $65,000 Annual NEPA Planning Summary NEPA Reviews of Proposals to Implement Enterprise SRS Initiatives unknown The Savannah River Site Strategic Plan for 2011 - 2015 describes 12 initiatives that Enterprise SRS will pursue by applying SRS's management core competencies in nuclear materials. Implementation of new missions resulting from this effort will likely require NEPA review. However, until firm proposals are developed

180

Aerosol Best Estimate Value-Added Product  

Science Conference Proceedings (OSTI)

The objective of the Aerosol Best Estimate (AEROSOLBE) value-added product (VAP) is to provide vertical profiles of aerosol extinction, single scatter albedo, asymmetry parameter, and Angstroem exponents for the atmospheric column above the Central Facility at the ARM Southern Great Plains (SGP) site. We expect that AEROSOLBE will provide nearly continuous estimates of aerosol optical properties under a range of conditions (clear, broken clouds, overcast clouds, etc.). The primary requirement of this VAP was to provide an aerosol data set as continuous as possible in both time and height for the Broadband Heating Rate Profile (BBHRP) VAP in order to provide a structure for the comprehensive assessment of our ability to model atmospheric radiative transfer for all conditions. Even though BBHRP has been completed, AEROSOLBE results are very valuable for environmental, atmospheric, and climate research.

Flynn, C; Turner, D; Koontz, A; Chand, D; Sivaraman, C

2012-07-19T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Renewable Energy Requirements for Future Building Codes: Options for Compliance  

Science Conference Proceedings (OSTI)

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft{sup 2} of roof area or 0.5 W/ft{sup 2} of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft{sup 2} of r

Dillon, Heather E.; Antonopoulos, Chrissi A.; Solana, Amy E.; Russo, Bryan J.

2011-09-30T23:59:59.000Z

182

Microsoft Word - Requirements 0819.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Studying the ) DOE-HQ-2009-0003-0819 Studying the ) DOE-HQ-2009-0003-0819 Communications Requirements of Electric ) (Noticed May 11, 2010) Utilities to Inform Federal Smart Grid Policy ) ) Comments of San Diego Gas & Electric Company San Diego Gas & Electric Company ("SDG&E") files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern California Gas

183

Budget estimates. Fiscal year 1998  

SciTech Connect

The U.S. Congress has determined that the safe use of nuclear materials for peaceful purposes is a legitimate and important national goal. It has entrusted the Nuclear Regulatory Commission (NRC) with the primary Federal responsibility for achieving that goal. The NRC`s mission, therefore, is to regulate the Nation`s civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. The NRC`s FY 1998 budget requests new budget authority of $481,300,000 to be funded by two appropriations - one is the NRC`s Salaraies and Expenses appropriation for $476,500,000, and the other is NRC`s Office of Inspector General appropriation for $4,800,000. Of the funds appropriated to the NRC`s Salaries and Expenses, $17,000,000, shall be derived from the Nuclear Waste Fund and $2,000,000 shall be derived from general funds. The proposed FY 1998 appropriation legislation would also exempt the $2,000,000 for regulatory reviews and other assistance provided to the Department of Energy from the requirement that the NRC collect 100 percent of its budget from fees. The sums appropriated to the NRC`s Salaries and Expenses and NRC`s Office of Inspector General shall be reduced by the amount of revenues received during FY 1998 from licensing fees, inspection services, and other services and collections, so as to result in a final FY 1998 appropriation for the NRC of an estimated $19,000,000 - the amount appropriated from the Nuclear Waste Fund and from general funds. Revenues derived from enforcement actions shall be deposited to miscellaneous receipts of the Treasury.

1997-02-01T23:59:59.000Z

184

Estimation of Rainfall for Flood Prediction from WSR-88D Reflectivity: A Case Study, 17–18 October 1994  

Science Conference Proceedings (OSTI)

Flood forecasting requires accurate estimates of the spatial and temporal rainfall rates over a catchment. Depending on the Z–R relationship and threshold values, processing of WSR-88D reflectivity data affects the rainfall estimates used in ...

Baxter E. Vieux; Philip B. Bedient

1998-06-01T23:59:59.000Z

185

State estimation on correlated copies  

E-Print Network (OSTI)

State estimation is usually analyzed in the situation when copies are in a product state, either mixed or pure. We investigate here the concept of state estimation on correlated copies. We analyze state estimation on correlated N qubit states, which are permutationally invariant. Using a correlated state we try to estimate as good as possible the direction of the Bloch vector of a single particle reduced density matrix. We derive the optimal fidelity for all permutation invariant states. We find the optimal state, which yields the highest estimation fidelity among the states with the same reduced density matrix. Interestingly this state is not a product state. We also point out that states produced by optimal universal cloning machines are the worst form the point of view of estimating the reduced density matrix.

Rafal Demkowicz-Dobrzanski

2004-12-20T23:59:59.000Z

186

Bounding estimate of DWPF mercury emissions  

DOE Green Energy (OSTI)

Purges required for H2 flammability control and verification of elevated Formic Acid Vent Condenser (FAVC) exit temperatures due to NO{sub x} reactions have lead to significant changes in Chemical Process Cell (CPC) operating conditions. Accordingly, mercury emissions estimates have been updated based upon the new operating requirements, IDMS (Integrated DWPF Melter System) experience, and development of an NO{sub x}/FAVC model which predicts FAVC exit temperatures. Using very conservative assumptions and maximum purge rates, the maximum calculated Hg emissions is approximately 130 lbs/yr. A range of 100 to 120 lbs/yr is conservatively predicted for other operating conditions. Defense Waste Processing Facility (DWPF) permitted Hg emissions are 175 lbs/yr (0.02 lbs/hr annual average).

Jacobs, R.A.

1992-12-01T23:59:59.000Z

187

Mandatory Photovoltaic System Cost Estimate | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mandatory Photovoltaic System Cost Estimate Mandatory Photovoltaic System Cost Estimate Mandatory Photovoltaic System Cost Estimate < Back Eligibility Utility Savings Category Solar Buying & Making Electricity Program Info State Colorado Program Type Line Extension Analysis Provider Colorado Public Utilities Commission At the request of a customer or a potential customer, Colorado electric utilities are required to conduct a cost comparison of a photovoltaic (PV) system to any proposed distribution line extension if the customer or potential customer provides the utility with load data (estimated monthly kilowatt-hour usage) requested by the utility to conduct the comparison, and if the customer's or potential customer's peak demand is estimated to be less than 25 kilowatts (kW). In performing the comparison analysis, the

188

Microsoft PowerPoint - Cost Estimating for Hydro Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Estimating Estimating for Hydropower Project Planning M Th Mona Thomason Chief, Product Coordination Branch Hydroelectric Design Center 13 J 2012 13 June 2012 US Army Corps of Engineers BUILDING STRONG ® Overview Overview  Background g  USACE hydropower project cost estimating y p p j g process  Challenges in cost estimating & strategies for mitigation of cost risk BUILDING STRONG ® HYDROELECTRIC DESIGN CENTER 2 USACE regulations USACE regulations  ER 1110-1-1300 Cost Engineering Policy and General Requirements  ER 1110-2-1150 Engineering and Design for Civil Works Project  ER 1110-2-1302 Civil Works Cost Engineering ETL 1110 2 573 C t ti C t E ti ti  ETL 1110-2-573 Construction Cost Estimating Guide for Civil Works BUILDING STRONG ® HYDROELECTRIC DESIGN CENTER 3 Hydroelectric

189

Expert judgement in cost estimating: Modelling the reasoning process  

E-Print Network (OSTI)

Expert Judgement (EJ) is used extensively during the generation of cost estimates. Cost estimators have to make numerous assumptions and judgements about what they think a new product will cost. However, the use of EJ is often frowned upon, not well accepted or understood by non-cost estimators within a concurrent engineering environment. Computerised cost models, in many ways, have reduced the need for EJ but by no means have they, or can they, replace it. The cost estimates produced from both algorithmic and non-algorithmic cost models can be widely inaccurate; and, as the work of this paper highlights, require extensive use of judgement in order to produce a meaningful result. Very little research tackles the issues of capturing and integrating EJ and rationale into the cost estimating process. Therefore, this

Christopher Rush; Rajkumar Roy

2001-01-01T23:59:59.000Z

190

Analytical Requirements for Petroleum Contaminated Soils  

E-Print Network (OSTI)

Analytical Requirements for Petroleum Contaminated Soils According to 20 NMAC 9.1.704 704. REQUIRED), or other applicable statutes. Page 1 of 1Analytical Requirements for Petroleum Contaminated Soils 4

191

A Requirements Analyst's Apprentice: A Proposal  

E-Print Network (OSTI)

The Requirements Analyst's APprentice (RAAP) partially automates the modeling process involved in creating a software requirement. It uses knowledge of the specific domain and general experience regarding software requirements ...

Reubenstein, Howard

192

Identification of water requirements for selected enhanced oil recovery methods  

SciTech Connect

Water requirements for enhanced oil recovery (EOR) are thoroughly evaluated by using publicly available information, data from actual field applications, and information provided by knowledgeable EOR technologists in fourteen major oil companies. The different uses of water in selected EOR methods, as well as current research trends, are discussed. Water quantity and quality requirements are estimated for individual EOR processes (steam drive; in situ combustion; and carbon dioxide, micellar-polymer, polymer, and caustic flooding) in those states and specific geographical locations where these processes will likely play major roles in future petroleum production by the year 2000. The estimated quantity requirements represent the total water needed from all sources (e.g., aquifers, lakes, produced water). A reduction in these quantities can be achieved by reinjecting all of the produced water potentially available for recycle (e.g., some is lost in oil and water separation and water treatment processes) in the oil recovery method. For injection water quality requirements, it is noted that not all of the water used for EOR needs to be fresh. The use of treated produced water can significantly reduce the quantities of fresh water that would be sought from other sources. Although no major EOR project to date has been abandoned because of water supply problems, competing regional uses for water, drought situations, and scarcity of high quality (e.g., low total dissolved solids) surface water and ground water could be impediments to certain projects in the near future. 4 figures, 14 tables.

Royce, B.; Kaplan, E.; Garrell, M.; Geffen, T.M.

1982-09-01T23:59:59.000Z

193

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses, Supervisory Essentials and Navigating the Federal Hiring Process are required to fulfill the first 40-hour of the probationary period mandatory training requirement for new supervisors. All other courses listed in the training framework are suggested to meet overall continual learning requirements. Supervisory Training Requirements More Documents & Publications EM's Development Program for New Managers/Supervisors Presentation DOE F 3315.1 Supervisory - Non-Supervisory Employee Performance Management and

194

Cold vacuum drying facility design requirements  

SciTech Connect

This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

IRWIN, J.J.

1999-07-01T23:59:59.000Z

195

ALS Beamline Design Requirements - Revision 1  

E-Print Network (OSTI)

the beamline including: • Electrical power requirements e.at the ALS include: • Electrical power: 480VAC, 208VAC, 120terminations, and electrical power requirements. Beamline

Heimann, Phil

2010-01-01T23:59:59.000Z

196

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

197

Supervisory Training Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supervisory Training Requirements Supervisory Training Requirements The Office of Learning and Workforce Development has developed an inventory of training and developmental...

198

Federal Energy Management Program: Federal Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Requirements to someone by E-mail Share Federal Energy Management Program: Federal Requirements on Facebook Tweet about Federal Energy Management Program: Federal...

199

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Management Requirements by Subject to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Subject on Facebook Tweet about Federal...

200

National Bridge Inventory Record Data Submission Requirement...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement 2011.09.02 OECM-NBI Record Data Submission Req.pdf More...

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

NERSC/DOE HEP Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 High Energy Physics (HEP) Logistics Workshop Logistics Workshop Location Hilton Washington...

202

Alternative Fuels Data Center: Petroleum Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Petroleum Reduction Petroleum Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Petroleum Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Petroleum Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Petroleum Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Petroleum Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Petroleum Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Petroleum Reduction Requirements The Wisconsin Department of Administration's fleet management policy

203

Alternative Fuels Data Center: Vehicle Registration Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Registration Vehicle Registration Requirement to someone by E-mail Share Alternative Fuels Data Center: Vehicle Registration Requirement on Facebook Tweet about Alternative Fuels Data Center: Vehicle Registration Requirement on Twitter Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Google Bookmark Alternative Fuels Data Center: Vehicle Registration Requirement on Delicious Rank Alternative Fuels Data Center: Vehicle Registration Requirement on Digg Find More places to share Alternative Fuels Data Center: Vehicle Registration Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Vehicle Registration Requirement Motor vehicle registration applicants must provide proof of compliance with

204

Renewable Generation Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Requirement Renewable Generation Requirement Eligibility Investor-Owned Utility Retail Supplier Savings For Bioenergy Buying & Making Electricity Water Solar Heating &...

205

Studying the Communications Requirements of Electric Utilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities...

206

Communications Requirements of Smart Grid Technologies | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Communications Requirements of Smart Grid Technologies Communications Requirements of Smart Grid Technologies This report sets forth the findings of the U.S. Department of Energy...

207

ASHRAE Standard 90.1-2004 -- Building Envelope Requirements | Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Envelope Requirements Building Envelope Requirements This course provides an overview of the building envelope requirements of ASHRAE Standard 90.1-2004. Estimated Length: 60 minutes Presenters: John Hogan, City of Seattle Original Webcast Date: Thursday, June 14, 2007 - 13:00 CEUs Offered: 1.0 AIA/CES LU (HSW); .10 CEUs towards ICC renewal certification. Course Type: Video Downloads: Presentation Slides Video Watch on YouTube Visit the BECP Online Training Center for instructions on how to obtain a certificate of completion. Building Type: Commercial Focus: Compliance Code Version: ASHRAE Standard 90.1-2004 Target Audience: Architect/Designer Builder Code Official Contractor Engineer State Official Contacts Web Site Policies U.S. Department of Energy USA.gov Last Updated: Wednesday, July 18, 2012 - 16:04

208

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

209

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

210

Repository disposal requirements for commercial transuranic wastes (generated without reprocessing)  

SciTech Connect

This report forms a preliminary planning basis for disposal of commercial transuranic (TRU) wastes in a geologic repository. Because of the unlikely prospects for commercial spent nuclear fuel reprocessing in the near-term, this report focuses on TRU wastes generated in a once-through nuclear fuel cycle. The four main objectives of this study were to: develop estimates of the current inventories, projected generation rates, and characteristics of commercial TRU wastes; develop proposed acceptance requirements for TRU wastes forms and waste canisters that ensure a safe and effective disposal system; develop certification procedures and processing requirements that ensure that TRU wastes delivered to a repository for disposal meet all applicable waste acceptance requirements; and identify alternative conceptual strategies for treatment and certification of commercial TRU first objective was accomplished through a survey of commercial producers of TRU wastes. The TRU waste acceptance and certification requirements that were developed were based on regulatory requirements, information in the literature, and from similar requirements already established for disposal of defense TRU wastes in the Waste Isolation Pilot Plant (WIPP) which were adapted, where necessary, to disposal of commercial TRU wastes. The results of the TRU waste-producer survey indicated that there were a relatively large number of producers of small quantities of TRU wastes.

Daling, P.M.; Ludwick, J.D.; Mellinger, G.B.; McKee, R.W.

1986-06-01T23:59:59.000Z

211

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements  

E-Print Network (OSTI)

NUCLEAR ENGINEERING & RADIOLOG SC BSE Plan Requirements 1 Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 6000BSE RG 6412 NUCLEAR ENGINEERING no exceptions here) RG 6521 NUCLEAR ENGINEERING AND RADIOLOGICAL SCIENCES RESIDENCY, GPA REQUIREMENTS Effective

Shyy, Wei

212

A systematic review of security requirements engineering  

Science Conference Proceedings (OSTI)

One of the most important aspects in the achievement of secure software systems in the software development process is what is known as Security Requirements Engineering. However, very few reviews focus on this theme in a systematic, thorough and unbiased ... Keywords: Requirements engineering, Secure development, Security, Security engineering, Security requirements, Security requirements engineering, Systematic review

Daniel Mellado; Carlos Blanco; Luis E. Sánchez; Eduardo Fernández-Medina

2010-06-01T23:59:59.000Z

213

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

throughout the city. In California, one solar-coveredcommuters’ electric cars. California requires that, by 2025,

Shoup, Donald

2012-01-01T23:59:59.000Z

214

The emergence of requirements networks: the case for requirements inter-dependencies  

Science Conference Proceedings (OSTI)

Do system requirements depend on each other? Or, do system requirements live in an isolated world of their own and act independently by being completely oblivious to the presence of other requirements? Since a singular requirement does ...

Vishwajeet Kulshreshtha; John Boardman; Dinesh Verma

2012-10-01T23:59:59.000Z

215

Radiation dose estimates for radiopharmaceuticals  

SciTech Connect

Tables of radiation dose estimates based on the Cristy-Eckerman adult male phantom are provided for a number of radiopharmaceuticals commonly used in nuclear medicine. Radiation dose estimates are listed for all major source organs, and several other organs of interest. The dose estimates were calculated using the MIRD Technique as implemented in the MIRDOSE3 computer code, developed by the Oak Ridge Institute for Science and Education, Radiation Internal Dose Information Center. In this code, residence times for source organs are used with decay data from the MIRD Radionuclide Data and Decay Schemes to produce estimates of radiation dose to organs of standardized phantoms representing individuals of different ages. The adult male phantom of the Cristy-Eckerman phantom series is different from the MIRD 5, or Reference Man phantom in several aspects, the most important of which is the difference in the masses and absorbed fractions for the active (red) marrow. The absorbed fractions for flow energy photons striking the marrow are also different. Other minor differences exist, but are not likely to significantly affect dose estimates calculated with the two phantoms. Assumptions which support each of the dose estimates appears at the bottom of the table of estimates for a given radiopharmaceutical. In most cases, the model kinetics or organ residence times are explicitly given. The results presented here can easily be extended to include other radiopharmaceuticals or phantoms.

Stabin, M.G.; Stubbs, J.B.; Toohey, R.E. [Oak Ridge Inst. of Science and Education, TN (United States). Radiation Internal Dose Information Center

1996-04-01T23:59:59.000Z

216

Electronic reliability estimation: how reliable are the results?  

Science Conference Proceedings (OSTI)

The development of Safety Critical Systems requires the compliance to several safety standards and regulations. Since, most of the times, human life is at stake, it is crucial to fully understand the behaviour of the system being developed in order to ... Keywords: MIL-Hdbk-217F, MTTF, estimation, reliability

Nuno Silva; Rui Lopes

2012-09-01T23:59:59.000Z

217

Selectivity Estimation for Spatio-Temporal Queries to Moving Objects  

E-Print Network (OSTI)

omni@islab.kaist.ac.kr chungcw@cs.kaist.ac.kr Divisionof ComputerScience Department of Electrical of selection queries: one for historical positions of moving objects and the other for future positions the selection query efficiently, an accu- rate estimation of the selectivity is required. The selectivity

Chung, Chin-Wan

218

State estimation in bioprocesses: extended Kalman filter vs. neural network  

Science Conference Proceedings (OSTI)

In biotechnology the demand for process control strategies has increased during the last decades. As fermentation processes become more and more complex, increasing requirements are posed to the control tools. A high-level process control depends on ... Keywords: streptococcus thermophilus, bio-engineering, extended Kalman filter, neural networks, state estimation

J. Hörrmann; D. Barth; M. Kräling; H. Röck

2007-05-01T23:59:59.000Z

219

Principal Components Instrumental Variable Estimation  

E-Print Network (OSTI)

. The reason for the inconsistency is that the least squares estimation used for the projection of the first stage tends to fit too well, rendering an overfitted PKX which is still correlated with u if the number of instruments is large. The estimating... -dimensional IVE is just an IVE and as such possesses up to rn?G?2 moments, and thus it may achieve the performance in terms of bias of the ‘no moments’ estimators without displaying their unduly volatility due to fat tails. The fulfilment of condition (A) is key...

Winkelried, Diego; Smith, Richard J.

2011-01-31T23:59:59.000Z

220

COBRA: A Hybrid Method for Software Cost Estimation, Benchmarking, and Risk Assessment  

E-Print Network (OSTI)

Current cost estimation techniques have a number of drawbacks. For example, developing algorithmic models requires extensive past project data. Also, off-the-shelf models have been found to be difficult to calibrate but inaccurate without calibration. Informal approaches based on experienced estimators depend on estimators' availability and are not easily repeatable, as well as not being much more accurate than algorithmic techniques. In this paper we present a method for cost estimation that combines aspects of algorithmic and experiential approaches (referred to as COBRA, COst estimation, Benchmarking, and Risk Assessment). We find through a case study that cost estimates using COBRA show an average ARE of 0.09, and show that the results are easily usable for benchmarking and risk assessment purposes. 1 Introduction Project and program managers require accurate and reliable cost estimates to allocate and control project resources, and to make realistic bids on external contracts. ...

Lionel C. Briand; Khaled El Emam; Frank Bomarius

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

FUEL HANDLING FACILITY BACKUP CENTRAL COMMUNICATIONS ROOM SPACE REQUIREMENTS CALCULATION  

SciTech Connect

The purpose of the Fuel Handling Facility Backup Central Communications Room Space Requirements Calculation is to determine a preliminary estimate of the space required to house the backup central communications room in the Fuel Handling Facility (FHF). This room provides backup communications capability to the primary communication systems located in the Central Control Center Facility. This calculation will help guide FHF designers in allocating adequate space for communications system equipment in the FHF. This is a preliminary calculation determining preliminary estimates based on the assumptions listed in Section 4. As such, there are currently no limitations on the use of this preliminary calculation. The calculations contained in this document were developed by Design and Engineering and are intended solely for the use of Design and Engineering in its work regarding the FHF Backup Central Communications Room Space Requirements. Yucca Mountain Project personnel from Design and Engineering should be consulted before the use of the calculations for purposes other than those stated herein or use by individuals other than authorized personnel in Design and Engineering.

B. SZALEWSKI

2005-03-22T23:59:59.000Z

222

Geothermal resource requirements for an energy self-sufficient spaceport  

DOE Green Energy (OSTI)

Geothermal resources in the southwestern United States provide an opportunity for development of isolated spaceports with local energy self-sufficiency. Geothermal resources can provide both thermal energy and electrical energy for the spaceport facility infrastructure and production of hydrogen fuel for the space vehicles. In contrast to hydrothermal resources by which electric power is generated for sale to utilities, hot dry rock (HDR) geothermal resources are more wide-spread and can be more readily developed at desired spaceport locations. This paper reviews a dynamic model used to quantify the HDR resources requirements for a generic spaceport and estimate the necessary reservoir size and heat extraction rate. The paper reviews the distribution of HDR resources in southern California and southern New Mexico, two regions where a first developmental spaceport is likely to be located. Finally, the paper discusses the design of a HDR facility for the generic spaceport and estimates the cost of the locally produced power.

Kruger, P.; Fioravanti, M. [Stanford Univ., CA (United States). Civil Engineering Dept.; Duchane, D.; Vaughan, A. [Los Alamos National Lab., NM (United States). Earth and Environmental Sciences Div.

1997-01-01T23:59:59.000Z

223

Estimation of Surface Heat Flux  

Science Conference Proceedings (OSTI)

The authors reconsider the problem of estimating the sensible heat transfer at the earth's surface from direct measurements of turbulent fluxes in the atmospheric boundary layer. For simplicity, only horizontally homogeneous conditions are ...

Jielun Sun; Steven K. Esbensen; L. Mahrt

1995-09-01T23:59:59.000Z

224

Estimation of resources and reserves  

E-Print Network (OSTI)

This report analyzes the economics of resource and reserve estimation. Current concern about energy problems has focused attention on how we measure available energy resources. One reads that we have an eight-year oil ...

Massachusetts Institute of Technology. Energy Laboratory.

1982-01-01T23:59:59.000Z

225

Selected Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

226

Part B - Requirements & Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B - Requirements & Funding Information B - Requirements & Funding Information PART B - Requirements & Funding Information .......................................................................................... 2 PART B - Requirements & Funding Information B.1. Purpose This Part of the IA (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting Agency' sufficient to demonstrate a bona fide need and identifies funds associated with the requirement to allow [insert the name of agency/organization that will provide acquisition services for the Department of Energy], hereinafter 'the Servicing Agency,' to provide acquisition assistance and conduct an interagency acquisition.

227

PDV Uncertainty Estimation & Methods Comparison  

Science Conference Proceedings (OSTI)

Several methods are presented for estimating the rapidly changing instantaneous frequency of a time varying signal that is contaminated by measurement noise. Useful a posteriori error estimates for several methods are verified numerically through Monte Carlo simulation. However, given the sampling rates of modern digitizers, sub-nanosecond variations in velocity are shown to be reliably measurable in most (but not all) cases. Results support the hypothesis that in many PDV regimes of interest, sub-nanosecond resolution can be achieved.

Machorro, E.

2011-11-01T23:59:59.000Z

228

Estimate product quality with ANNs  

Science Conference Proceedings (OSTI)

Artificial neural networks (ANNs) have been applied to predict catalytic reformer octane number (ON) and gasoline splitter product qualities. Results show that ANNs are a valuable tool to derive fast and accurate product quality measurements, and offer a low-cost alternative to online analyzers or rigorous mathematical models. The paper describes product quality measurements, artificial neural networks, ANN structure, estimating gasoline octane numbers, and estimating naphtha splitter product qualities.

Brambilla, A. [Univ. of Pisa (Italy); Trivella, F. [Adicon Advanced Distillation Control SrL, Pisa (Italy)

1996-09-01T23:59:59.000Z

229

An Estimate of Residential Energy Savings From IECC Change Proposals  

NLE Websites -- All DOE Office Websites (Extended Search)

An Estimate of Residential Energy Savings From IECC Change Proposals An Estimate of Residential Energy Savings From IECC Change Proposals Recommended for Approval at the ICC's Fall, 2009, Initial Action Hearings The U.S. Department of Energy (DOE) has established ambitious goals to improve the energy efficiency requirements of the International Energy Conservation Code (IECC) for residential buildings. DOE has established near- and long-term goals of 30% and 50% energy efficiency improvements, respectively, compared to the 2006 IECC. This report presents DOE's approach to calculating residential energy consumption for the purpose of estimating energy savings attributable to improvements in the code. This approach is then used to estimate the national average energy savings, relative to the 2006 IECC, resulting from the proposed improvements DOE submitted and supported for the 2012 IECC.

230

A Statistical Method for Estimating Luminosity Functions using Truncated Data  

E-Print Network (OSTI)

The observational limitations of astronomical surveys lead to significant statistical inference challenges. One such challenge is the estimation of luminosity functions given redshift $z$ and absolute magnitude $M$ measurements from an irregularly truncated sample of objects. This is a bivariate density estimation problem; we develop here a statistically rigorous method which (1) does not assume a strict parametric form for the bivariate density; (2) does not assume independence between redshift and absolute magnitude (and hence allows evolution of the luminosity function with redshift); (3) does not require dividing the data into arbitrary bins; and (4) naturally incorporates a varying selection function. We accomplish this by decomposing the bivariate density into nonparametric and parametric portions. There is a simple way of estimating the integrated mean squared error of the estimator; smoothing parameters are selected to minimize this quantity. Results are presented from the analysis of a sample of quasars.

Chad M. Schafer

2007-02-15T23:59:59.000Z

231

Preliminary relative permeability estimates of methanehydrate-bearing sand  

Science Conference Proceedings (OSTI)

The relative permeability to fluids in hydrate-bearing sediments is an important parameter for predicting natural gas production from gas hydrate reservoirs. We estimated the relative permeability parameters (van Genuchten alpha and m) in a hydrate-bearing sand by means of inverse modeling, which involved matching water saturation predictions with observations from a controlled waterflood experiment. We used x-ray computed tomography (CT) scanning to determine both the porosity and the hydrate and aqueous phase saturation distributions in the samples. X-ray CT images showed that hydrate and aqueous phase saturations are non-uniform, and that water flow focuses in regions of lower hydrate saturation. The relative permeability parameters were estimated at two locations in each sample. Differences between the estimated parameter sets at the two locations were attributed to heterogeneity in the hydrate saturation. Better estimates of the relative permeability parameters require further refinement of the experimental design, and better description of heterogeneity in the numerical inversions.

Seol, Yongkoo; Kneafsey, Timothy J.; Tomutsa, Liviu; Moridis,George J.

2006-05-08T23:59:59.000Z

232

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial vehicle or gasoline powered vehicle may not idle for more than five minutes during any 60-minute period. Exemptions are allowed for the

233

Alternative Fuels Data Center: Biodiesel Warranty Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Warranty Warranty Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Warranty Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Warranty Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Warranty Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Warranty Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Warranty Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Warranty Requirement All new state government diesel vehicles must have a manufacturer's warranty that allows the use of biodiesel blends of 20% (B20) in the

234

Alternative Fuels Data Center: Biofuels Blender Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Blender Biofuels Blender Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Blender Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Blender Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Blender Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Blender Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Blender Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Blender Requirements Blenders of ethanol and gasoline and biodiesel and diesel fuels outside of the bulk transfer terminal system must obtain a blender's license and are

235

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A gasoline-fueled motor vehicle is not allowed to operate for more than three consecutive minutes when the vehicle is not in motion, with the

236

Alternative Fuels Data Center: Biodiesel Sales Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Sales Biodiesel Sales Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Sales Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Sales Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Sales Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Sales Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Sales Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Sales Requirements It is unlawful for any person to sell, offer for sale, assist in the sale of, deliver, or permit to be sold or offered for sale any biodiesel,

237

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle at a loading zone, parking or service area, route terminal, or other off-street areas, except for the following situations:

238

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle engine may not operate for more than five consecutive minutes when the vehicle is not in motion, with the following exceptions:

239

Alternative Fuels Data Center: Idle Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirements Effective May 1, 2014, a driver may not idle his or her motor vehicle for more than five minutes in a 60-minute period. This limit does not apply if

240

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel vehicles with a gross vehicle weight rating over 10,000 pounds may not idle for more than five minutes in any continuous 60 minute period.

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement The owner or operator of a diesel powered vehicle must limit the length of time their vehicle remains idle. The limit is based on the outside

242

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Any motor vehicle fuel sold at retail containing more than 1% ethanol or methanol must be labeled according to Connecticut Department of Consumer

243

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles may not idle unnecessarily for longer than five consecutive minutes during any 60-minute period. This includes heavy-duty diesel

244

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Diesel truck or bus engines may not idle for more than 15 consecutive minutes. Exemptions apply to diesel trucks or buses for which the Nevada

245

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement All gasoline containing 1% or more ethanol by volume offered for sale must be conspicuously identified as "with ethanol" or "containing ethanol."

246

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A person that operates a diesel powered motor vehicle in certain counties and townships may not cause or allow the motor vehicle, when it is not in

247

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 75% of the Missouri Department of Transportation (MoDOT) vehicles and heavy equipment that use diesel fuel must be fueled with biodiesel

248

Alternative Fuels Data Center: Biofuel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Use Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirement State agencies must take all reasonable actions to develop the infrastructure necessary to increase the availability and use of E85 and biodiesel throughout the state. Employees using state-owned vehicles are

249

Mobile IP Authentication, Authorization, and Accounting Requirements  

Science Conference Proceedings (OSTI)

The Mobile IP and Authentication, Authorization, Accounting (AAA) working groups are currently looking at defining the requirements for Authentication, Authorization, and Accounting. This document contains the requirements which would have to be supported ...

S. Glass; T. Hiller; S. Jacobs; C. Perkins

2000-10-01T23:59:59.000Z

250

Salt Lake City- High Performance Buildings Requirement  

Energy.gov (U.S. Department of Energy (DOE))

Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

251

Business System Planning Project System Requirements Specification  

SciTech Connect

The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

NELSON, R.E.

2000-09-08T23:59:59.000Z

252

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Network Requirements for ESnet Update to the 2002 Office ofNetwork Requirements for ESnet Update to the 2002 Office ofEdited by Eli Dart, ESnet Engineering Staff dart@es.net

2006-01-01T23:59:59.000Z

253

Functions and Requirements for the Transition Project  

SciTech Connect

This document describes the functional requirement baseline for the Transition of 100 K Area Facilities Project (Transition Project). This baseline information consists of top-level functions, requirements, concept description, interface description, issues, and enabling assumptions.

YANOCHKO, R.M.

2000-04-24T23:59:59.000Z

254

Alternative Fuels Data Center: Emissions Control Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Control Emissions Control Requirement to someone by E-mail Share Alternative Fuels Data Center: Emissions Control Requirement on Facebook Tweet about Alternative Fuels Data Center: Emissions Control Requirement on Twitter Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Google Bookmark Alternative Fuels Data Center: Emissions Control Requirement on Delicious Rank Alternative Fuels Data Center: Emissions Control Requirement on Digg Find More places to share Alternative Fuels Data Center: Emissions Control Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Control Requirement Heavy-duty diesel vehicles used to perform federally funded state public works contracts must be powered by engines with Level 3 emissions control

255

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A diesel- or gasoline-powered motor vehicle may not idle for more than three consecutive minutes, except under the following conditions: 1) to

256

Alternative Fuels Data Center: Ethanol Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Labeling Ethanol Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Labeling Requirement Motor fuel containing more than 1% ethanol or methanol may not be sold or offered for sale from a motor fuel dispenser unless the individual selling

257

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement At least 20% of all diesel fuel used to fuel state agency vehicles, vessels, and construction equipment must be biodiesel. The Washington

258

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Motor vehicles licensed for commercial or public service may not idle for more than three minutes in commercial or residential urban areas, unless

259

Alternative Fuels Data Center: Biodiesel Labeling Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Labeling Labeling Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Labeling Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Labeling Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Labeling Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Labeling Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Labeling Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Labeling Requirement Biodiesel fuel retailers may not advertise or offer for sale fuel labeled as pure biodiesel unless the fuel contains no other type of petroleum

260

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Idling of any unattended vehicle is prohibited in Utah. Violators are subject to a penalty of up to $750 and/or up to 90 days imprisonment.

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement On-road heavy-duty motor vehicles with a gross vehicle weight rating of 8,500 pounds or greater may not idle for more than three consecutive

262

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle may not idle for more than five consecutive minutes. This regulation does not apply to: 1) vehicles being serviced, provided that

263

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement Vehicle operators may not idle any commercial diesel vehicle with a gross vehicle weight rating of more than 10,000 pounds for more than 10 minutes

264

Alternative Fuels Data Center: Biodiesel Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Use Biodiesel Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Google Bookmark Alternative Fuels Data Center: Biodiesel Use Requirement on Delicious Rank Alternative Fuels Data Center: Biodiesel Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Use Requirement All diesel-powered motor vehicles, light trucks, and equipment owned or leased by a state agency must operate using diesel fuel that contains a

265

Alternative Fuels Data Center: Ethanol Blend Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Blend Ethanol Blend Requirement to someone by E-mail Share Alternative Fuels Data Center: Ethanol Blend Requirement on Facebook Tweet about Alternative Fuels Data Center: Ethanol Blend Requirement on Twitter Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Google Bookmark Alternative Fuels Data Center: Ethanol Blend Requirement on Delicious Rank Alternative Fuels Data Center: Ethanol Blend Requirement on Digg Find More places to share Alternative Fuels Data Center: Ethanol Blend Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Blend Requirement Suppliers that import gasoline for sale in North Carolina must offer fuel that is not pre-blended with fuel alcohol but that is suitable for future

266

Alternative Fuels Data Center: Propane Supplier Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane Supplier Propane Supplier Requirements to someone by E-mail Share Alternative Fuels Data Center: Propane Supplier Requirements on Facebook Tweet about Alternative Fuels Data Center: Propane Supplier Requirements on Twitter Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Google Bookmark Alternative Fuels Data Center: Propane Supplier Requirements on Delicious Rank Alternative Fuels Data Center: Propane Supplier Requirements on Digg Find More places to share Alternative Fuels Data Center: Propane Supplier Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Propane Supplier Requirements A retail supplier may only distribute liquefied petroleum gas (LPG or propane) if the supplier holds a license from the Wisconsin Department of

267

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement School bus operators may not idle a school bus engine for more than three consecutive minutes except under the following conditions: uncontrollable

268

Alternative Fuels Data Center: Biofuels Feedstock Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Feedstock Biofuels Feedstock Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuels Feedstock Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuels Feedstock Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Google Bookmark Alternative Fuels Data Center: Biofuels Feedstock Requirements on Delicious Rank Alternative Fuels Data Center: Biofuels Feedstock Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuels Feedstock Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Feedstock Requirements Renewable fuel production plants operating in Louisiana and deriving ethanol from the distillation of corn must use corn crops harvested in

269

Alternative Fuels Data Center: Biofuels Use Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Use Biofuels Use Requirement to someone by E-mail Share Alternative Fuels Data Center: Biofuels Use Requirement on Facebook Tweet about Alternative Fuels Data Center: Biofuels Use Requirement on Twitter Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Google Bookmark Alternative Fuels Data Center: Biofuels Use Requirement on Delicious Rank Alternative Fuels Data Center: Biofuels Use Requirement on Digg Find More places to share Alternative Fuels Data Center: Biofuels Use Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuels Use Requirement State-owned diesel-powered vehicles and equipment must use a biodiesel blend that contains at least 2% biodiesel (B2), where available, as long as

270

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduction Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A commercial motor vehicle with a gross vehicle weight rating of 10,000 pounds or more may not idle for more than 15 minutes in any 60-minute

271

Alternative Fuels Data Center: Tire Inflation Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Tire Inflation Tire Inflation Requirement to someone by E-mail Share Alternative Fuels Data Center: Tire Inflation Requirement on Facebook Tweet about Alternative Fuels Data Center: Tire Inflation Requirement on Twitter Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Google Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Delicious Rank Alternative Fuels Data Center: Tire Inflation Requirement on Digg Find More places to share Alternative Fuels Data Center: Tire Inflation Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Tire Inflation Requirement The California Air Resources Board (ARB) enforces regulations to reduce greenhouse gas emissions from vehicles operating inefficiently with under

272

Alternative Fuels Data Center: Biofuel Use Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuel Use Biofuel Use Requirements to someone by E-mail Share Alternative Fuels Data Center: Biofuel Use Requirements on Facebook Tweet about Alternative Fuels Data Center: Biofuel Use Requirements on Twitter Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Google Bookmark Alternative Fuels Data Center: Biofuel Use Requirements on Delicious Rank Alternative Fuels Data Center: Biofuel Use Requirements on Digg Find More places to share Alternative Fuels Data Center: Biofuel Use Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biofuel Use Requirements To reduce fossil fuel dependence and statewide greenhouse gas emissions, New Jersey state departments, agencies, offices, universities, and colleges

273

Alternative Fuels Data Center: Biodiesel Producer Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biodiesel Producer Biodiesel Producer Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Producer Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Producer Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Producer Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Producer Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Producer Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Producer Requirements Biodiesel is defined as a fuel that is composed of mono-alkyl esters of long-chain fatty acids derived from plant or animal matter, meets the

274

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A vehicle may not idle for more than five minutes from April through October in cities and counties where the local government has signed a

275

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A driver may not idle a vehicle on a roadway outside a business or residential district when it is practical to stop and park the vehicle. A

276

Science-Driven Network Requirements for ESnet  

E-Print Network (OSTI)

Update to the 2002 Office of Science Networking RequirementsUpdate to the 2002 Office of Science Networking RequirementsUS Dept. of Energy, Office of Science, Advanced Scientific

2006-01-01T23:59:59.000Z

277

DOE G 430.1-1 Chp 15, Estimating Methods  

Directives, Delegations, and Requirements

Estimating methods, estimating indirect and direct costs, and other estimating considerations are discussed in this chapter.

1997-03-28T23:59:59.000Z

278

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

requirement and guidance pages include: Sustainable Buildings and Campuses Facility Energy Intensity Reduction New Facility Construction and Major Renovation Pollution...

279

WATER REQUIREMENTS FOR A RADIOCHEMICAL PROCESSING PLANT  

SciTech Connect

A survey of the water requirements is presented for a hypothetical plant to process all the fuel from a 15,000Mwe nuclear economy. For each processing plant, specific requirements must be based on a detailed water survey which includes water quality, process requirements, and in-plant conservation plans. These considerations are discussed and the quantitative requirements are listed. (J.R.D.)

Harrington, F.E.

1962-05-28T23:59:59.000Z

280

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Requirements...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and planning requirements management...

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Civilian Radioactive Waste Management System Requirements Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System Requirements Document More Documents & Publications Transportation, Aging and Disposal Canister System Performance Specification: Revision 1 FY 2007 Total...

282

SPECIAL ACQUISITION REQUIREMENTS ? TYPICAL ISSUES ASSOCIATED...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(iii) Approving any contractual documents, to include documents defining requirements, incentive plans, and evaluation criteria (iv) Awarding contracts (v) Administering...

283

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our...

284

Integrating Security RMF with Requirements Management – J ...  

Science Conference Proceedings (OSTI)

Integrating Security RMF with Requirements Management – J Peeler ... Security controls at “Low” Risk are risk accepted & may not need mitigation. ...

2013-12-13T23:59:59.000Z

285

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

286

Guidelines for Mapping Requirements to Technologies  

Science Conference Proceedings (OSTI)

This report describes in a concise format the IntelliGrid methodology for determining appropriate technologies to meet a given set of system requirements for advanced metering infrastructures (AMI). The process consists of three steps: 1) map technologies to functional areas of AMI, 2) map requirements to components and, therefore, functional areas of AMI, and 3) map individual requirements to technologies.

2008-06-17T23:59:59.000Z

287

Advanced Metering Infrastructure (AMI) System Security Requirements  

Science Conference Proceedings (OSTI)

This report identifies key cyber security requirements and suggests basic security approaches for safeguarding the many interfaces of Advanced Metering Infrastructure (AMI) systems. These requirements, which were developed through a clearly defined security assessment procedure, are generic; but they can be used to develop more specific security requirements based on actual configurations and environments.

2009-12-21T23:59:59.000Z

288

Nuclear fuel fabrication and refabrication cost estimation methodology  

SciTech Connect

The costs for construction and operation of nuclear fuel fabrication facilities for several reactor types and fuels were estimated, and the unit costs (prices) of the fuels were determined from these estimates. The techniques used in estimating the costs of building and operating these nuclear fuel fabrication facilities are described in this report. Basically, the estimation techniques involve detailed comparisons of alternative and reference fuel fabrication plants. Increases or decreases in requirements for fabricating the alternative fuels are identified and assessed for their impact on the capital and operating costs. The impact on costs due to facility size or capacity was also assessed, and scaling factors for the various captial and operating cost categories are presented. The method and rationale by which these scaling factors were obtained are also discussed. By use of the techniques described herein, consistent cost information for a wide variety of fuel types can be obtained in a relatively short period of time. In this study, estimates for 52 fuel fabrication plants were obtained in approximately two months. These cost estimates were extensively reviewed by experts in the fabrication of the various fuels, and, in the opinion of the reviewers, the estimates were very consistent and sufficiently accurate for use in overall cycle assessments.

Judkins, R.R.; Olsen, A.R.

1979-11-01T23:59:59.000Z

289

Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants  

Science Conference Proceedings (OSTI)

This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook.

Ball, J.R.; Cohen, S.; Ziegler, E.Z.

1984-10-01T23:59:59.000Z

290

Guidance & Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

291

SIENA Customer Problem Statement and Requirements  

Science Conference Proceedings (OSTI)

This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

2000-08-01T23:59:59.000Z

292

A Bayesian Framework for Combining Valuation Estimates  

E-Print Network (OSTI)

Obtaining more accurate equity value estimates is the starting point for stock selection, value-based indexing in a noisy market, and beating benchmark indices through tactical style rotation. Unfortunately, discounted cash flow, method of comparables, and fundamental analysis typically yield discrepant valuation estimates. Moreover, the valuation estimates typically disagree with market price. Can one form a superior valuation estimate by averaging over the individual estimates, including market price? This article suggests a Bayesian framework for combining two or more estimates into a superior valuation estimate. The framework justifies the common practice of averaging over several estimates to arrive at a final point estimate.

Kenton K. Yee

2007-07-24T23:59:59.000Z

293

Quantum state estimation with unknown measurements  

E-Print Network (OSTI)

Improved measurement techniques are central to technological development and foundational scientific exploration. Quantum optics relies upon detectors sensitive to non-classical features of light, enabling precise tests of physical laws and quantum-enhanced technologies such as precision measurement and secure communications. Accurate detector response calibration for quantum-scale inputs is key to future research and development in these cognate areas. To address this requirement quantum detector tomography (QDT) has been recently introduced. However, the QDT approach becomes increasingly challenging as the complexity of the detector response and input space grows. Here we present the first experimental implementation of a versatile alternative characterization technique to address many-outcome quantum detectors by limiting the input calibration region. To demonstrate the applicability of this approach the calibrated detector is subsequently used to estimate non-classical photon number states.

Merlin Cooper; Michal Karpinski; Brian J. Smith

2013-06-27T23:59:59.000Z

294

A Framework for Automating Cost Estimates in Assembly Processes  

SciTech Connect

When a product concept emerges, the manufacturing engineer is asked to sketch out a production strategy and estimate its cost. The engineer is given an initial product design, along with a schedule of expected production volumes. The engineer then determines the best approach to manufacturing the product, comparing a variey of alternative production strategies. The engineer must consider capital cost, operating cost, lead-time, and other issues in an attempt to maximize pro$ts. After making these basic choices and sketching the design of overall production, the engineer produces estimates of the required capital, operating costs, and production capacity. 177is process may iterate as the product design is refined in order to improve its pe~ormance or manufacturability. The focus of this paper is on the development of computer tools to aid manufacturing engineers in their decision-making processes. This computer sof~are tool provides aj?amework in which accurate cost estimates can be seamlessly derivedfiom design requirements at the start of any engineering project. Z+e result is faster cycle times through first-pass success; lower ll~e cycie cost due to requirements-driven design and accurate cost estimates derived early in the process.

Calton, T.L.; Peters, R.R.

1998-12-09T23:59:59.000Z

295

Density estimation for data with rounding errors  

Science Conference Proceedings (OSTI)

Rounding of data is common in practice. The problem of estimating the underlying density function based on data with rounding errors is addressed. A parametric maximum likelihood estimator and a nonparametric bootstrap kernel density estimator are proposed. ... Keywords: Bootstrapping, Deconvolution density estimation, Fast Fourier transformation, Kernel density estimation, Measurement error

B. Wang, W. Wertelecki

2013-09-01T23:59:59.000Z

296

James-Stein type estimators of variances  

Science Conference Proceedings (OSTI)

In this paper we propose James-Stein type estimators for variances raised to a fixed power by shrinking individual variance estimators towards the arithmetic mean. We derive and estimate the optimal choices of shrinkage parameters under both the squared ... Keywords: 62H12, Inadmissibility, Shrinkage estimation, Shrinkage parameter, Squared loss function, Stein loss function, Variance estimation

Tiejun Tong; Homin Jang; Yuedong Wang

2012-05-01T23:59:59.000Z

297

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

298

2001: Surface estimation based on LIDAR  

E-Print Network (OSTI)

In the past several years, the use of airborne laser systems or LIDAR for the rapid collection of digital terrain models (DTMs) has proliferated. Flood plain studies, contouring, road engineering projects, volumetric computations, ortho-photo production, and mapping for beach erosion are just some of the applications driving the demand for this technology. The ability of LIDAR systems to capture accurate spot heights at an extremely rapid rate is the principle reason behind LIDAR's success. Many applications, for example, contouring, require a bald-earth DTM. Unfortunately, the raw data points captured by LIDAR do not constitute a bald-earth DTM. Even though most LIDAR systems can measure "lastreturn" data points, these "last-return " points often measure ground clutter like shrubbery, cars, buildings, and even the canopy of dense foliage. Consequently, raw LIDAR points must be post-processed to remove these undesirable returns. The degree to which this post processing is successful is critical in determining whether LIDAR is cost effective for large-scale mapping applications. We present our approach to estimating bald-earth surfaces from LIDAR data. Our approach is different from typical approaches in that we estimate a surface based on the original LIDAR points while at the same time considering important supplementary information. This other information includes independently measured breaklines and surface categories. We use a least-squares adjustment with robust estimation similar to that proposed by (Kraus, Pfeifer, 1998). The surface model is represented using a triangular irregular network or TIN. We present examples from a real mapping project that demonstrate the success of this approach.

Wolfgang Schickler; Anthony Thorpe

2001-01-01T23:59:59.000Z

299

Estimation of Horizontal Diffusion from Oblique Aerial Photographs of Smoke Clouds  

Science Conference Proceedings (OSTI)

A photogrammetric method is described for obtaining estimates of the horizontal diffusion parameter ?y from oblique aerial photographs of smoke clouds. The method requires three reference markers on the ground to determine the geometry in each ...

Richard M. Eckman; Torben Mikkelsen

1991-12-01T23:59:59.000Z

300

Analysis of a Method to Estimate Chlorophyll-a Concentration from Irradiance Measurements at Varying Depths  

Science Conference Proceedings (OSTI)

A model to estimate chlorophyll-a concentration and yellow substance absorption at 440 nm from irradiance measurements made at varying depths is examined. The derivation of the model, requiring irradiance measurements at three wavebands, is ...

Jasmine S. Nahorniak; Mark R. Abbott; Ricardo M. Letelier; W. Scott Pegau

2001-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Estimating Summer Design Temperatures from Daily Maximum Temperatures in New Mexico  

Science Conference Proceedings (OSTI)

Many climatological locations report only maximum and minimum temperatures. However, in certain applications, such as estimation of design temperatures, the frequency distribution of hourly temperatures is required. For this reason, a method is ...

Kenneth E. Kunkel

1986-04-01T23:59:59.000Z

302

On the empirical estimation of utility distribution damping parameters using power quality waveform data  

Science Conference Proceedings (OSTI)

This paper describes an efficient yet accurate methodology for estimating system damping. The proposed technique is based on linear dynamic system theory and the Hilbert damping analysis. The proposed technique requires capacitor switching waveforms ...

Kyeon Hur; Surya Santoso; Irene Y. H. Gu

2007-01-01T23:59:59.000Z

303

A quantitative framework For large-scale model estimation and discrimination In systems biology  

E-Print Network (OSTI)

Using models to simulate and analyze biological networks requires principled approaches to parameter estimation and model discrimination. We use Bayesian and Monte Carlo methods to recover the full probability distributions ...

Eydgahi, Hoda

2013-01-01T23:59:59.000Z

304

Cogeneration of Fast Motion Estimation Processors and Algorithms for Advanced Video Coding  

Science Conference Proceedings (OSTI)

This paper presents a flexible and scalable motion estimation processor capable of supporting the processing requirements for high-definition (HD) video using the H.264 Advanced Video Codec, which is suited for FPGA implementation. Unlike most previous ...

Jose L. Nunez-Yanez; Atukem Nabina; Eddie Hung; George Vafiadis

2012-03-01T23:59:59.000Z

305

Improving Nonparametric Estimates of the Sea State Bias in Radar Altimeter Measurements of Sea Level  

Science Conference Proceedings (OSTI)

A fully nonparametric (NP) version of the sea state bias (SSB) estimation problem in radar altimetry was first presented and solved by Gaspar and Florens (GF) using the statistical technique of kernel smoothing. This solution requires solving a ...

Philippe Gaspar; Sylvie Labroue; Françoise Ogor; Guillaume Lafitte; Laurence Marchal; Magali Rafanel

2002-10-01T23:59:59.000Z

306

Direct Estimation of the Reynolds Stress Vertical Structure in the Nearshore  

Science Conference Proceedings (OSTI)

Measurements of the vertical Reynolds stress components in the wave-dominated nearshore are required to diagnose momentum and turbulence dynamics. Removing wave bias from Reynolds stress estimates is critical to a successful diagnosis. Here two ...

Falk Feddersen; A. J. Williams III

2007-01-01T23:59:59.000Z

307

Estimating Central Equatorial Pacific SST Variability over the Past Millennium. Part I: Methodology and Validation  

Science Conference Proceedings (OSTI)

Constraining the low-frequency (LF) behavior of general circulation models (GCMs) requires reliable observational estimates of LF variability. This two-part paper presents multiproxy reconstructions of Niño-3.4 sea surface temperature over the ...

Julien Emile-Geay; Kimberly M. Cobb; Michael E. Mann; Andrew T. Wittenberg

2013-04-01T23:59:59.000Z

308

Quality Controlling Surf Zone Acoustic Doppler Velocimeter Observations to Estimate the Turbulent Dissipation Rate  

Science Conference Proceedings (OSTI)

High-quality measurements of the turbulent dissipation rate ? are required to diagnose field surf-zone turbulence budgets. Quality control (QC) methods are presented for estimating surf zone ? with acoustic Doppler velocimeter (ADV) data. Bad ADV ...

Falk Feddersen

2010-12-01T23:59:59.000Z

309

Equations for Estimating the Similarity Parameter from Radiation Measurements within Weakly Absorbing Optically Thick Clouds  

Science Conference Proceedings (OSTI)

Series expansions are derived for estimating the similarity parameter, which is a combination of the single-scattering albedo and asymmetry factor, from radiance measurement deep in the interior of a weary absorbing cloud. One expansion requires ...

T. Duracz; N. J. McCormick

1986-03-01T23:59:59.000Z

310

Mooring Design Using Wave-State Estimate from the Southern Ocean  

Science Conference Proceedings (OSTI)

The Southern Ocean Flux Station was deployed near 47°S, 140°E. The extreme wind and wave conditions at this location require appropriate mooring design, which includes dynamic fatigue analysis and static analysis. An accurate estimate of the wave ...

E. W. Schulz; M. A. Grosenbaugh; L. Pender; D. J. M. Greenslade; T. W. Trull

2011-10-01T23:59:59.000Z

311

RSS Fingerprints Based Distributed Semi-Supervised Locally Linear Embedding (DSSLLE) Location Estimation System for Indoor WLAN  

Science Conference Proceedings (OSTI)

An important requirement for many novel location based services, is to determine the locations of people, equipment, animals, etc. The accuracy and response time of estimation are critical issues in location estimation system. Most of the location estimation ... Keywords: Dimensional reduction techniques, Distributed systems, Locally linear embedding (LLE), Location aware services, Semi-supervised learning, User location and tracking, Wireless LANs

Vinod Kumar Jain; Shashikala Tapaswi; Anupam Shukla

2013-07-01T23:59:59.000Z

312

GA-based method for feature selection and parameters optimization for machine learning regression applied to software effort estimation  

Science Conference Proceedings (OSTI)

Context: In software industry, project managers usually rely on their previous experience to estimate the number men/hours required for each software project. The accuracy of such estimates is a key factor for the efficient application of human resources. ... Keywords: Feature selection, Genetic algorithms, Regression, Software effort estimation, Support vector regression

Adriano L. I. Oliveira; Petronio L. Braga; Ricardo M. F. Lima; Márcio L. Cornélio

2010-11-01T23:59:59.000Z

313

Estimating and understanding DOE waste management costs`  

SciTech Connect

This paper examines costs associated with cleaning up the US Department of Energy`s (DOE`s) nuclear facilities, with particular emphasis on the waste management program. Life-cycle waste management costs have been compiled and reported in the DOE Baseline Environmental Management Report (BEMR). Waste management costs are a critical issue for DOE because of the current budget constraints. The DOE sites are struggling to accomplish their environmental management objectives given funding scenarios that are well below anticipated waste management costs. Through the BEMR process, DOE has compiled complex-wide cleanup cost estimates and has begun analysis of these costs with respect to alternative waste management scenarios and policy strategies. From this analysis, DOE is attempting to identify the major cost drivers and prioritize environmental management activities to achieve maximum utilization of existing funding. This paper provides an overview of the methodology DOE has used to estimate and analyze some waste management costs, including the key data requirements and uncertainties.

Kang, J.S. [USDOE, Washington, DC (United States); Sherick, M.J. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1995-12-01T23:59:59.000Z

314

Integrated Estimates of Global Terrestrial Carbon Sequestration  

SciTech Connect

Assessing the contribution of terrestrial carbon sequestration to international climate change mitigation requires integration across scientific and disciplinary boundaries. As part of a scenario analysis for the US Climate Change Technology Program, measurements and geographic data were used to develop terrestrial carbon sequestration estimates for agricultural soil carbon, reforestation and pasture management. These estimates were then applied in the MiniCAM integrated assessment model to evaluate mitigation strategies within policy and technology scenarios aimed at achieving atmospheric CO2 stabilization by 2100. Adoption of terrestrial sequestration practices is based on competition for land and economic markets for carbon. Terrestrial sequestration reach a peak combined rate of 0.5 to 0.7 Gt carbon yr-1 in mid-century with contributions from agricultural soil (0.21 Gt carbon yr-1), reforestation (0.31 Gt carbon yr-1) and pasture (0.15 Gt carbon yr-1). Sequestration rates vary over time period and with different technology and policy scenarios. The combined contribution of terrestrial sequestration over the next century ranges from 31 to 41 GtC. The contribution of terrestrial sequestration to mitigation is highest early in the century, reaching up to 20% of total carbon mitigation. This analysis provides insight into the behavior of terrestrial carbon mitigation options in the presence and absence of climate change mitigation policies.

Thomson, Allison M.; Izaurralde, R Cesar; Smith, Steven J.; Clarke, Leon E.

2008-02-01T23:59:59.000Z

315

BLE: Battery Life Estimator | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Life Estimator (BLE) software is a state-of-the-art tool kit for fitting battery aging data and for battery life estimation. It was designed to make life-cycle estimates...

316

Cost and production estimation for a cutter suction dredge  

E-Print Network (OSTI)

The need for accurate cost estimates is well recognized in the dredging industry. In order for a dredging contractor to efficiently execute a project from its conception to its completion, an accurate estimate of the final cost is imperative. The most practical method of determining the cost is through the use of a computer program, based on the capability of personal computers to manipulate large amounts of data and perform difficult calculations without error. Development of such a program requires both theoretical and practical knowledge of the dredging process. There are several existing cost estimation and production estimation programs in use in the dredging industry today. Several different algorithms to estimate production have been developed over the years, and there are some non-proprietary production programs. However, the majority of both cost and production estimation programs are proprietary and therefore not available to those apart from the individual company. Therefore, the need exists for a program of this type which can be made available to the general public. This report discusses the development of a new generalized cost and production estimation program. Both slurry transport theory and centrifugal pump theory are incorporated into the production component of the program. This is necessary to obtain an accurate production estimate in the absence of a great deal of data for a specific dredge. Practical knowledge of costs associated with the dredging process is applied in the cost estimation component. The gram is written in the Quattropro(version6.01)spread sheet formatand may be used in conjunction with Microsoft Windows version 3.1 or Windows95. The acronym CSDCEP has been given to the program, which stands for Cutter detailing the operation of the program is available. The cost estimate results produced by CSDCEP were compared with actual data and government cost estimates for twenty one completed projects. The average difference between the estimate and the actual costs was twenty four percent. CSDCEP is a generalized cost estimating program that yields a good approximation of the final dredging cost.

Miertschin, Michael Wayne

1997-01-01T23:59:59.000Z

317

NERSC HPC Program Requirements Review Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Published Reports Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 BER2017FinalJune7.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Biological and Environmental Research - Target 2017 NERSC-ASCR-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research NERSC-NP-WorkshopReport.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Nuclear Physics Research NERSC-FES-WorkshopReport.pdf | Adobe Acrobat PDF file

318

Generalized linear model-based expert system for estimating the cost of transportation projects  

Science Conference Proceedings (OSTI)

Timely effective cost management requires reliable cost estimates at every stage of project development. While underestimation of transportation costs seems to be a global trend, improving early cost prediction accuracy in estimates is difficult. This ... Keywords: Cost management, Expert system, Generalized linear model, Relational database, Transportation projects

Jui-Sheng Chou

2009-04-01T23:59:59.000Z

319

An Improved Cluster Richness Estimator  

Science Conference Proceedings (OSTI)

Minimizing the scatter between cluster mass and accessible observables is an important goal for cluster cosmology. In this work, we introduce a new matched filter richness estimator, and test its performance using the maxBCG cluster catalog. Our new estimator significantly reduces the variance in the L{sub X}-richness relation, from {sigma}{sub lnL{sub X}}{sup 2} = (0.86 {+-} 0.02){sup 2} to {sigma}{sub lnL{sub X}}{sup 2} = (0.69 {+-} 0.02){sup 2}. Relative to the maxBCG richness estimate, it also removes the strong redshift dependence of the richness scaling relations, and is significantly more robust to photometric and redshift errors. These improvements are largely due to our more sophisticated treatment of galaxy color data. We also demonstrate the scatter in the L{sub X}-richness relation depends on the aperture used to estimate cluster richness, and introduce a novel approach for optimizing said aperture which can be easily generalized to other mass tracers.

Rozo, Eduardo; /Ohio State U.; Rykoff, Eli S.; /UC, Santa Barbara; Koester, Benjamin P.; /Chicago U. /KICP, Chicago; McKay, Timothy; /Michigan U.; Hao, Jiangang; /Michigan U.; Evrard, August; /Michigan U.; Wechsler, Risa H.; /SLAC; Hansen, Sarah; /Chicago U. /KICP, Chicago; Sheldon, Erin; /New York U.; Johnston, David; /Houston U.; Becker, Matthew R.; /Chicago U. /KICP, Chicago; Annis, James T.; /Fermilab; Bleem, Lindsey; /Chicago U.; Scranton, Ryan; /Pittsburgh U.

2009-08-03T23:59:59.000Z

320

Periodicity estimation of Dynamic Textures  

Science Conference Proceedings (OSTI)

Dynamic Textures (DTs) are image sequences of natural events like fire, smoke, water etc., that possesses regular motion patterns. Periodicity is a widely used tool to analyse regular structures of periodic one dimensional signals as well as two dimensional ... Keywords: co-occurrence matrix, dynamic textures, image sequences, image texture analysis, motion patterns, natural events, periodicity estimation, temporal textures

Khalid Zaman Bijon; Ahmed Hasan; Ashfaqur Rahman; Manzur Murshed

2008-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Bases for pump pit requirements calculations  

DOE Green Energy (OSTI)

A task team is preparing the Process Requirements for the interarea transfer pump pits at the Defense Waste Process Facility (DWPF). The team is developing requirements to prevent flammable mixtures from forming and requires values to use on the generation of various components such as benzene, hydrogen, and N20. The purpose of this memorandum is to document values to be used and to provide sample calculations using these values. There are no recommendations contained in this document.

Jacobs, R.A.

1992-02-13T23:59:59.000Z

322

Safety of magnetic fusion facilities: Requirements  

SciTech Connect

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

1996-05-01T23:59:59.000Z

323

Estimation of Radionuclide Content in Contaminated Laundry  

SciTech Connect

Radioactively contaminated laundry is normally sent off site for processing. Laundry is defined as radiologically contaminated anti-cs and respirators. This laundry is shipped as "limited quantity," in accordance with 49CFR173.421. This requires that 95% of the radionuclides shipped are characterized and quantified. In addition, the total quantity must be 10(-3) below the A2 limits specified in 49CFR173. In any facility evaluated, the most conservative (highest activity) waste stream was used as the source term. If a new waste stream is established for a facility, its normalized activity should be compared to the evaluated waste stream to ensure the limits are not exceeded. This article documents a method used for estimating the radionuclide content in contaminated laundry. The maximum values were compared to 49CFR173. Itwas determined that if the contaminated laundry/respirators are shipped in an Interstate Nuclear Services (INS), L-59, limited quantity shipping container and the highest contact radiation level on any side, as measured with an ion chamber, does not exceed 0.5 mR h(-1), the container complies with the requirements of 49CFR173 and could be shipped "limited quantity" from any of the facilities evaluated.

Schrader, Bradley J

2001-08-01T23:59:59.000Z

324

Unsupervised clustering and centroid estimation using dynamic ...  

Science Conference Proceedings (OSTI)

solving cluster detection and centroid estimation prob- lems. ... density function and these vectors estimate the cen- ..... an algorithm to minimize a cost function.

325

Estimating Waste Inventory and Waste Tank Characterization |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimating Waste Inventory and Waste Tank Characterization Estimating Waste Inventory and Waste Tank Characterization Summary Notes from 28 May 2008 Generic Technical Issue...

326

NBP RFI: Communications Requirements- Honeywell Responses To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal...

327

Program Requirements | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Follow this link to skip to the main content Facebook Flickr RSS Twitter YouTube Program Requirements | National Nuclear Security Administration Our Mission Managing the Stockpile...

328

Partnership Requirements: ENERGY STAR Partnership for Commercial...  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Secondary menu About us Press room Contact Us Portfolio Manager...

329

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

330

Electric Vehicle Charging Levels and Requirements Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

and certification Safety standards and certification * Charging definitions * EVSE ( (electric vehicle supp pp y ly eq quip pment) ) examp ples * Installation requirements * Siting...

331

Exterior Lighting Requirements and COMcheck | Building Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

Version Development Adoption Compliance Regulations Resource Center Exterior Lighting Requirements and COMcheck This course includes a discussion of the exterior lighting...

332

This content requires Flash - Business Cards  

This content requires Flash. To view this content, JavaScript must be enabled, and you need the latest version of the Adobe Flash Player. Download the ...

333

Allocating Variability and Reserve Requirements (Presentation)  

SciTech Connect

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

334

Requirements of Magnetic Materials for Current Technological ...  

Science Conference Proceedings (OSTI)

Mar 3, 2011 ... Magnetic Materials for Energy Applications: Requirements of Magnetic ... Hard magnetic materials play a significant role in many green ...

335

NERSC/DOE HPC Requirements Workshops Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview NERSC HPC Program Requirements Reviews Overview Scope These workshops are focused on determining the computational challenges facing research teams and the computational...

336

NERSC/DOE BER Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

for Biological and Environmental Research: Target 2017 A Joint ASCR BER NERSC Requirements Review September 11-12, 2012 DOE NERSC Participants and Organizers Name...

337

NERSC/DOE FES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Fusion Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for fusion energy sciences...

338

NERSC/DOE ASCR Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Logistics Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research January 5-6, 2011 Location The workshop will be held at NERSC's...

339

NERSC/DOE BES Requirements Workshop Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy's Office of Basic Energy Sciences and Office of Advanced Scientific Computing Research (ASCR) to elucidate computing requirements for high energy physics...

340

NERSC/DOE ASCR Requirements Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop Agenda Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research ASCR NERSC Workshop January 5-6, 2011 >> Download and View these...

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

NERSC/DOE ASCR Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 Sort by: Default | Name |...

342

NERSC/DOE ASCR Requirements Workshop Participants  

NLE Websites -- All DOE Office Websites (Extended Search)

Participants Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research An ASCR NERSC Workshop January 5-6, 2011 On-Site Participants Name...

343

Cape Charles - STIP Minimum Sustainability Requirements (Virginia...  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Cape Charles - STIP Minimum Sustainability Requirements (Virginia) This is the approved revision of this page, as well as...

344

Allocating Variability and Reserve Requirements (Presentation)  

DOE Green Energy (OSTI)

This presentation describes how you could conceivably allocate variability and reserve requirements, including how to allocate aggregation benefits. Conclusions of this presentation are: (1) Aggregation provides benefits because individual requirements are not 100% correlated; (2) Method needed to allocate reduced requirement among participants; (3) Differences between allocation results are subtle - (a) Not immediately obvious which method is 'better'; (b) Many are numerically 'correct', they sum to the physical requirement; (c) Many are not 'fair', Results depend on sub-aggregation and/or the order individuals are included; and (4) Vector allocation method is simple and fair.

Kirby, B.; King, J.; Milligan, M.

2011-10-01T23:59:59.000Z

345

Federal Energy Management Program: Energy Management Requirements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Law and Regulation Federal agencies must meet energy management requirements outlined by Federal various statutory laws and regulations. They include: National Energy Conservation...

346

NERSC/DOE BER Requirements Meeting Logistics  

NLE Websites -- All DOE Office Websites (Extended Search)

Math & Computer Science Nuclear Science Science Highlights HPC Requirements Reviews Basic Energy Sciences Fusion Energy Sciences (FES) High Energy Physics (HEP) Biological and...

347

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows 7, Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not...

348

LBNL Windows & Daylighting Software -- THERM: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Windows XP, Windows 2000TM.. Older version of Microsoft Windows might work, but are not supported. (The...

349

LBNL Windows & Daylighting Software -- WINDOW: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

REQUIREMENTS OPERATING SYSTEM Program has been tested on Microsoft Vista, Microsoft Windows 7, Microsoft Windows XP, Windows 2000TM.. It has been reported by users that the...

350

Figure 1.6 State-Level Energy Consumption Estimates and Estimated ...  

U.S. Energy Information Administration (EIA)

Figure 1.6 State-Level Energy Consumption Estimates and Estimated Consumption per Capita, 2010 Consumption Consumption per Capita

351

Building HVAC Requirements Overview Page 4-1 4 Building HVAC Requirements  

E-Print Network (OSTI)

Building HVAC Requirements ­ Overview Page 4-1 4 Building HVAC Requirements 4.1 Overview 4 conditioning (HVAC) systems. The requirements are presented in this chapter so that it may serve as a single. 2008 Residential Compliance Manual August 2009 #12;Page 4-2 Building HVAC Requirements ­ Overview 4

352

Core Science Requirement Final Document Page 1 THE CORE SCIENCE REQUIREMENT and  

E-Print Network (OSTI)

Core Science Requirement ­ Final Document ­ Page 1 THE CORE SCIENCE REQUIREMENT and MENDEL SCIENCE EXPERIENCE COURSES Core requirement of 2 semesters of science with laboratory; requirement to be met by the end of the sophomore year Rationale Science literacy is an integral part of the intellectual

Lagalante, Anthony F.

353

European Cross-National Production Networks in the Auto Industry: Eastern Europe as the Low End of European Car Complex  

E-Print Network (OSTI)

to produce 30,000 Passat car anually from 1993 onwards. The1997) Origin: country rd POLAND EU CEFTA 1. new cars 1 2.used cars 3. Engines 4. bodies 5. gearbox 6. tires 7. other

van Tulder, Rob; Ruigrok, Winifred

1998-01-01T23:59:59.000Z

354

Class I Disposal Well Plugging and Abandonment Cost Estimate  

E-Print Network (OSTI)

Per your request, Petrotek Engineering Corporation (Petrotek) has prepared a plugging and abandonment cost estimate for the proposed COGEMA DW No. 4 and No. 5 wells. Because the well design and completion for both wells are very similar, one cost is provided that is representative for each of the wells. The procedures included herein are based on COGEMA's permit modification application to Wyoming Department of Environmental Quality (WDEQ) UIC Permit 00-340 which applies to both wells, and WDEQ regulations and guidance. A time and materials cost estimate for plugging either of the wells follows. The cost is based on information provided by COGEMA, WDEQ requirements, our field experience, and recent quotes from applicable vendors. The costs are based on the following assumptions:> A falloff test and Radioactive Tracer log (RAT) may be required. Based on historical WDEQ requirements, (1) a falloff test would be required if more than six months has elapsed since the last falloff test, and (2) a Part II mechanical integrity test (e.g., a RAT log) would be required if more than 2 years had elapsed since the last RAT log.> Materials disposal (e.g., tubing, packer, wellhead and other debris) will be

Christensen Ranch; Disposal Wellfield; Donna Wichers

2007-01-01T23:59:59.000Z

355

Automated consistency checking of requirements specifications  

Science Conference Proceedings (OSTI)

This article describes a formal analysis technique, called consistency checking, for automatic detection of errors, such as type errors, nondeterminism, missing cases, and circular definitions, in requirements specifications. The technique ... Keywords: application-independent properties, consistency checking, formal requirements modeling, software cost reduction methodology, tabular notations

Constance L. Heitmeyer; Ralph D. Jeffords; Bruce G. Labaw

1996-07-01T23:59:59.000Z

356

Designating required vs. optional input fields  

Science Conference Proceedings (OSTI)

This paper describes a study comparing different techniques for visually distingishing required from optional input fields in a form-filling application. Seven techniques were studied: no indication, bold field labels, chevrons in front of the labels, ... Keywords: data input, optional fields, required fields, visual design

Thomas S. Tullis; Ana Pons

1997-03-01T23:59:59.000Z

357

Supporting requirements engineers in recognising security issues  

Science Conference Proceedings (OSTI)

Context & motivation: More and more software projects today are security-related in one way or the other. Many environments are initially not considered security-related and no security experts are assigned. Requirements engineers often fail to recognise ... Keywords: empirical study, natural language processing, requirements analysis, secure software engineering

Eric Knauss; Siv Houmb; Kurt Schneider; Shareeful Islam; Jan Jürjens

2011-03-01T23:59:59.000Z

358

Clean Air Act Requirements: Uranium Mill Tailings  

E-Print Network (OSTI)

EPA'S Clean Air Act Requirements: Uranium Mill Tailings Radon Emissions Rulemaking Reid J. Rosnick Presentation to Environmental Protection Agency Uranium Contamination Radiation Protection Division (6608J requirements for operating uranium mill tailings (Subpart W) Status update on Subpart W activities Outreach

359

Requirements for wireless technology on rolling stock  

Science Conference Proceedings (OSTI)

This paper gives an overview of railway specific requirements on wireless technologies and discusses the influence of different product life cycles in railway industry and communication technology. The main challenges are the heterogeneous communication ... Keywords: maintenance, passenger information, product life cycle, railway application interface, railway requirements, train operation, wireless communication

Uwe Kucharzyk

2011-03-01T23:59:59.000Z

360

Lightweight Formalisation in Support of Requirements Engineering  

Science Conference Proceedings (OSTI)

Formal design supported by automated reasoning can help keep track of requirements—a particular problem for large, detailed systems. Designers of system specifications are often constrained by codes of practice and must show not only that ... Keywords: automated reasoning, design, requirements, safety-critical systems, software engineering, specifications

Jane Hesketh; David Robertson; Norbert Fuchs; Alan Bundy

1998-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Advanced Light Water Reactor utility requirements document  

SciTech Connect

The ALWR Requirements Document is a primary work product of the EPRI Program. This document is an extensive compilation of the utility requirements for design, construction and performance of advanced light water reactor power plants for the 1990s and beyond. The Requirements Document's primary emphasis is on resolution of significant problems experienced at existing nuclear power plants. It is intended to be used with companion documents, such as utility procurement specifications, which would cover the remaining detailed technical requirements applicable to new plant projects. The ALWR Requirements Document consists of several major parts. This volume is Part I, The Executive Summary. It is intended to serve as a concise, management level synopsis of advanced light water reactors including design objectives and philosophy, overall configuration and features and the steps necessary to proceed from the conceptual design stage to a completed, functioning power plant.

1986-06-01T23:59:59.000Z

362

Estimate Greenhouse Gas Reduction Potential and Cost-Effectiveness of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greenhouse Gas Reduction Potential and Cost-Effectiveness Greenhouse Gas Reduction Potential and Cost-Effectiveness of Strategies for Vehicles and Mobile Equipment Estimate Greenhouse Gas Reduction Potential and Cost-Effectiveness of Strategies for Vehicles and Mobile Equipment October 7, 2013 - 11:58am Addthis YOU ARE HERE: Step 3 After identifying petroleum reduction strategies, a Federal agency should estimate the greenhouse gas (GHG) reduction potential and cost effectiveness of these strategies for vehicles and mobile equipment. The table below provides steps for identifying optimal vehicle acquisition strategies. Table 1. Framework for Identifying Optimal Vehicle Acquisition Strategies Step Summary Purpose PLAN and COLLECT 1 Determine vehicle acquisition requirements Establish a structured Vehicle Allocation Matrix (VAM) to determine the numbers and types of vehicles required to accomplish your fleet's mission

363

NETL: News Release - DOE Estimates Future Water Needs for Thermoelectric  

NLE Websites -- All DOE Office Websites (Extended Search)

December 6, 2007 December 6, 2007 DOE Estimates Future Water Needs for Thermoelectric Power Plants 2007 Analysis Adds Projected Water Requirements for Carbon Capture WASHINGTON, DC - The Office of Fossil Energy's National Energy Technology Laboratory (NETL) has released a 2007 update to its groundbreaking study, Estimating Freshwater Needs to Meet Future Thermoelectric Generation Requirements. The updated analysis increases understanding of regional and national water needs and usage in the power industry, and provides input for research and development aimed at water-use reduction. MORE INFO Link to the updated study NETL's Water-Energy Interface web page New in this year's report is a response to heightened concerns over atmospheric carbon dioxide. The report examines the possibility that future

364

Bayesian estimation in homodyne interferometry  

E-Print Network (OSTI)

We address phase-shift estimation by means of squeezed vacuum probe and homodyne detection. We analyze Bayesian estimator, which is known to asymptotically saturate the classical Cramer-Rao bound to the variance, and discuss convergence looking at the a posteriori distribution as the number of measurements increases. We also suggest two feasible adaptive methods, acting on the squeezing parameter and/or the homodyne local oscillator phase, which allow to optimize homodyne detection and approach the ultimate bound to precision imposed by the quantum Cramer-Rao theorem. The performances of our two-step methods are investigated by means of Monte Carlo simulated experiments with a small number of homodyne data, thus giving a quantitative meaning to the notion of asymptotic optimality.

Stefano Olivares; Matteo G. A. Paris

2009-01-16T23:59:59.000Z

365

Water requirements for future energy production in California  

DOE Green Energy (OSTI)

This assessment estimates the impact of future national energy development on water resources. Energy development would include various types of electric power plants, production of synthetic fuels, coal and uranium mining, oil and gas extraction, and other conversion processes. The Energy Analysis Program at LBL has conducted this analysis for its assigned region, the states of California and Nevada. The objective of this study is to determine water requirements of energy technologies and their implications, with emphasis on emerging technologies for aggregated subareas (ASA) in California. The first phase of this study provides energy-supply projections and corresponding demands for water resources as perceived by regional and state groups responsible for or involved in energy planning in California and Nevada. The second phase of the study is designed to calculate the water requirements for the levels of energy development in California as specified by a Department of Energy scenario for the year 2000 and by utility projections as reported by the Federal Power Commission for 1985. The implications of these water requirements on competing water users are explored briefly. 24 references.

Sathaye, J.A.; Ritschard, R.L.

1977-05-01T23:59:59.000Z

366

Statutory Requirements | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Printable Version Development Adoption Compliance Regulations Resource Center Statutory Requirements DOE activities surrounding building energy codes are defined by the following statutory requirements. Specific language outlining federal requirements and associated regulations are outlined below. References are also provided to individual statutes. State Building Energy Efficiency Codes Statutory Authority: Energy Conservation and Production Act (ECPA) (Pub. L. No. 94-385), as amended1 Section 304(a) of ECPA, as amended, provides that when the 1992 Model Energy Code (MEC), or any successor to that code2, is revised, the Secretary must determine, not later than 12 months after the revision, whether the revised code would improve energy efficiency in residential

367

Green Building Requirement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Requirement Green Building Requirement Green Building Requirement < Back Eligibility Commercial Schools State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Solar Lighting Windows, Doors, & Skylights Heating Buying & Making Electricity Water Heating Wind Program Info State District of Columbia Program Type Energy Standards for Public Buildings Provider District Department of the Environment The District of Columbia City Council enacted [http://dcclims1.dccouncil.us/images/00001/20061218152322.pdf B16-515] on December 5, 2006, establishing green building standards for public buildings and privately-owned commercial buildings of 50,000 square feet or

368

Guide to NRC reporting and recordkeeping requirements  

SciTech Connect

This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the Code of Federal Regulations, Chapter I, on December 31, 1991. It also includes, in a separate section, any of those requirements that were superseded or discontinued from January through December 1991. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation.

Collins, M.; Shelton, B.

1992-11-01T23:59:59.000Z

369

Data requirements and acquisition for reservoir characterization  

Science Conference Proceedings (OSTI)

This report outlines the types of data, data sources and measurement tools required for effective reservoir characterization, the data required for specific enhanced oil recovery (EOR) processes, and a discussion on the determination of the optimum data density for reservoir characterization and reservoir modeling. The two basic sources of data for reservoir characterization are data from the specific reservoir and data from analog reservoirs, outcrops, and modern environments. Reservoir data can be divided into three broad categories: (1) rock properties (the container) and (2) fluid properties (the contents) and (3)interaction between reservoir rock and fluid. Both static and dynamic measurements are required.

Jackson, S.; Chang, Ming Ming; Tham, Min

1993-03-01T23:59:59.000Z

370

Supporting use case based requirements engineering  

E-Print Network (OSTI)

Use Cases that describe possible interactions involving a system and its environment are increasingly being accepted as effective means for functional requirements elicitation and analysis. In the current practice, informal definitions of use cases are used and the analysis process is manual. In this paper, we present an approach supported by a tool for use cases based requirements engineering. Our approach includes use cases formalization, a restricted form of natural language for use cases description, and the derivation of an executable specification as well as a simulation environment from use cases. Key words: Use cases, domain modeling, UML, requirements engineering, prototyping

Stéphane S. Somé

2006-01-01T23:59:59.000Z

371

Microsoft Word - Topic A Requirements _2_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Requirements A Requirements Topic A, Interconnection-Level Analysis and Planning Topic A awardees must fulfill the following requirements: 1. The work to be performed must cover the entire Interconnection. 2. Analyses and planning must be developed and performed in a transparent and collaborative manner, and the study processes must be open to participation by state and federal officials, representatives from independent system operators (ISOs) and regional transmission organizations (RTOs), utilities, and relevant stakeholder bodies or non-government organizations (NGO's), including appropriate entities in Canada and Mexico. Discuss approach to ensure consensus among stakeholders on key issues. 3. The awardee must establish a multi-constituency steering group that will provide

372

Using percolation techniques to estimate interwell connectivity probability  

E-Print Network (OSTI)

Reservoir connectivity is often an important consideration for reservoir management. For example, connectivity is an important control on waterflood sweep efficiency and requires evaluation to optimize injection well rates. The uncertainty of sandbody distributions, however, can make interwell connectivity prediction extremely difficult. Percolation models are a useful tool to simulate sandbody connectivity behavior and can be used to estimate interwell connectivity. This study discusses the universal characteristics of different sandbody percolation models and develops an efficient percolation method to estimate interwell connectivity. Using King and others results for fluid travel time between locations in a percolation model, we developed a method to estimate interwell connectivity. Three parameters are needed to use this approach: the sandbody occupied probabilitysandp, the dimensionless reservoir length, and the well spacing. To evaluate this new percolation method, the procedure was coded using Visual Basic and Mathematica and the results compared to those from two other methods, a simple geometrical model and Monte Carlo simulation. All these methods were applied to estimate interwell connectivity for the D1, D2, and D3 intervals in the Monument Butte field. The results suggest that the new percolation method can give reasonable effective-square sandbody dimensions and can estimate the interwell connectivity accurately for thin intervals with sandp in the 60% to 80% range. The proposed method requires that the reservoir interval for evaluation be sufficiently thin so that 2D percolation results can be applied. To extend the method to 3D cases, we propose an approach that can be used to estimate interwell connectivity for reservoirs having multiple, noncommunicating layers, and that considers the weight of each interval for multilayer estimation. This approach is applied to the three-layer case of Monument Butte field and the estimates showed the method gives useful results for well pattern design. For example, water saturation and interval thickness affect the weight of each interval to be included in the multilayer estimation. For thick intervals or heterogeneous sandbody distributions, the percolation method developed here is not suitable because it assumes thin layers. Future percolation research will be needed to adapt this new percolation method.

Li, Weiqiang

2007-08-01T23:59:59.000Z

373

Part B - Requirements & Funding Information PART B - Requirements and Funding Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b. Part B 1 b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable activity that requires an interagency agreement. This Part of the interagency agreement (IA) (hereinafter 'Part B') serves as the funding document. It provides specific information on the requirements of the Department of Energy, hereinafter 'the Requesting

374

Analysis of 2009 International Energy Conservation Code Requirements for Residential Buildings in Utah  

SciTech Connect

The 2009 International Energy Conservation Code (IECC) contains several major improvements in energy efficiency over the current Utah code, the 2006 IECC. The most notable changes are improved duct sealing and efficient lighting requirements. A limited analysis of these changes resulted in estimated savings of $168 to $188 for an average new house in Utah at recent fuel prices.

Cole, Pamala C.; Lucas, Robert G.

2009-05-01T23:59:59.000Z

375

DOE Challenge Home, California Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home California Program Requirements These Program Requirements shall only be used in the State of California. To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled

376

land requirements | OpenEI Community  

Open Energy Info (EERE)

by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv land use solar land use square miles I'm...

377

Siting Requirements for Anaerobic Lagoons (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

378

Tucson- Solar Design Requirement for Homes  

Energy.gov (U.S. Department of Energy (DOE))

Tucson adopted an ordinance in June 2008 that requires all new single-family homes and duplexes in Tucson to be "solar-ready." The ordinance was developed by a stakeholder group which included...

379

Microsoft Word - Requirements_list.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

SELECTED LIST OF REQUIREMENTS SELECTED LIST OF REQUIREMENTS DESCRIPTION REQUIREMENT APPLICABILITY 1. Federal Motor Carrier Registration 49 CFR 390.19; 390.21 Motor carriers that conduct commercial motor vehicle operations in interstate commerce. 2. Hazardous Materials Safety Permit 49 CFR 385, Subpart E Motor carriers that transport the hazardous materials listed at 49 CFR 385.403. 3. Federal Hazardous Materials Registration 49 CFR 107, Subpart G Offering or transporting a hazardous material listed at 49 CFR 107.601. This list includes hazardous materials requiring placarding. 4. Texas State Motor Carrier Registration 43 TAC, Chap. 18, Subchap. B Motor carriers that conduct commercial motor vehicle operations in Texas. 5. Unified Carrier Registration 49 CFR 367 Motor carriers, motor private carriers, brokers, freight forwarders and leasing companies.

380

Federal Greenhouse Gas Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements Requirements Federal Greenhouse Gas Requirements October 7, 2013 - 10:02am Addthis Executive Order (E.O.) 13514 expands the energy reduction and environmental requirements of Executive Order 13423 by making greenhouse gas (GHG) management a priority for the Federal government. Under Section 2 of E.O. 13514, each Federal agency must: Within 90 days of the order, establish and report to the CEQ Chair and OMB Director a percentage reduction target for agency-wide reductions of Scope 1 and Scope 2 GHG emissions in absolute terms by fiscal year 2020 relative to a fiscal year 2008 baseline of the agency's Scope 1 greenhouse gas emissions. In establishing the target, agencies shall consider reductions associated with: Reducing agency building energy intensity Increasing agency renewable energy use and implementing on-site renewable

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE Challenge Home, Washington Program Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Challenge Home Washington Program Requirements 9-1-2013 To qualify as a DOE Challenge Home, a home shall meet the minimum requirements specified below, be verified and field-tested in accordance with HERS Standards by an approved verifier, and meet all applicable codes. Builders may meet the requirements of either the Performance Path or the Prescriptive path to qualify a home. 1 Single family detached and attached dwelling units, and dwelling units in multifamily buildings with 3 stories or fewer above-grade 2,3 are eligible for qualification. DOE Challenge Home Prescriptive Path The prescriptive path provides a single set of measures that can be used to construct a DOE Challenge Home labeled home. Modeling is not required, but no tradeoffs are allowed. Follow these steps to use the prescriptive path:

382

Technical requirements specification for tank waste retrieval  

Science Conference Proceedings (OSTI)

This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

Lamberd, D.L.

1996-09-26T23:59:59.000Z

383

The Access Almanac: Solar Parking Requirements  

E-Print Network (OSTI)

for many commuters’ electric cars. California requires that,well suited to charging electric cars. If the solar energydrivers who don’t own electric cars can feel green when they

Shoup, Donald

2012-01-01T23:59:59.000Z

384

Cook County- LEED Requirements for County Buildings  

Energy.gov (U.S. Department of Energy (DOE))

In 2002, Cook County enacted an ordinance requiring all new county buildings and all retrofitted county buildings to be built to LEED standards. Specifically, all newly constructed buildings and...

385

Deepwater Offshore Wind Technology Research Requirements (Poster)  

DOE Green Energy (OSTI)

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

386

Deriving Quantified Safety Requirements in Complex Systems  

Science Conference Proceedings (OSTI)

A variety of hazard analysis techniques have been proposed for software-based systems but individually the techniques are limited in their ability to cope with system complexity, or to derive and prioritise component safety requirements. There is also ...

Peter A. Lindsay; John A. McDermid; David J. Tombs

2000-10-01T23:59:59.000Z

387

Deepwater Offshore Wind Technology Research Requirements (Poster)  

SciTech Connect

A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

Musial, W.

2005-05-01T23:59:59.000Z

388

Temporal Sampling Requirements for Automatic Rain Gauges  

Science Conference Proceedings (OSTI)

Automatic rain gauges are needed to obtain rainfall statistics from remote locations and platforms. Many of these platforms cannot be serviced regularly, thus requiring unattended operations for many months. At such locations there is often a ...

Jeffrey A. Nystuen

1998-12-01T23:59:59.000Z

389

NERSC/DOE FES Requirements Workshop Presentations  

NLE Websites -- All DOE Office Websites (Extended Search)

Fusion Energy Sciences An FES ASCR NERSC Workshop August 3-4, 2010 Sort by: Default | Name | Date (low-high) | Date (high-low) FESNERSC Requirements Gathering Workshop August...

390

LBNL Window & Daylighting Software -- RESFEN: System Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

SYSTEM REQUIREMENTS OPERATING SYSTEM Windows 95, Windows 98, Windows 2000, Windows XP, or Windows NT CPU TYPE Pentium (a 133 MHz pentium will take about 40 seconds to perform a...

391

Diagnostic Requirements for the Superrotation on Venus  

Science Conference Proceedings (OSTI)

For the solar heating and zonal wind profiles observed in the Venus atmosphere (below 80 km) we have calculated the eddy source pattern required to maintain the zonally averaged circulation.

Arthur Y. Hou; Richard M. Goody

1985-03-01T23:59:59.000Z

392

Energy Efficiency and Conservation Requirements for Utilities...  

Open Energy Info (EERE)

standard. Phase II will run from June 1, 2013 - May 31, 2016 and requires (tentatively) energy savings that vary by utility from 1.6% to 2.9% of June 2009 - May 2010 electricity...

393

Cold vacuum drying facility design requirements  

SciTech Connect

This release of the Design Requirements Document is a complete restructuring and rewrite to the document previously prepared and released for project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility.

Irwin, J.J.

1997-09-24T23:59:59.000Z

394

Smart Grid Information Security (IS) Functional Requirement  

E-Print Network (OSTI)

It is important to implement safe smart grid environment to enhance people's lives and livelihoods. This paper provides information on smart grid IS functional requirement by illustrating some discussion points to the sixteen identified requirements. This paper introduces the smart grid potential hazards that can be referred as a triggering factor to improve the system and security of the entire grid. The background of smart information infrastructure and the needs for smart grid IS is described with the adoption of hermeneutic circle as methodology. Grid information technology and security-s session discusses that grid provides the chance of a simple and transparent access to different information sources. In addition, the transformation between traditional versus smart grid networking trend and the IS importance on the communication field reflects the criticality of grid IS functional requirement identification is introduces. The smart grid IS functional requirements described in this paper are general and ...

Ling, Amy Poh Ai

2011-01-01T23:59:59.000Z

395

Requirements and Submission Process for Qualified Software  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements and Submission Process for Qualified Software The U.S. Department of Energy (DOE) verifies and maintains the list of software that qualifies for the calculation of the energy and power cost savings for commercial building tax deductions under tax code Section 179D. The software requirements are listed under Internal Revenue Service (IRS) Code §179D (c)(1) and (d) Regulations, Notice 2006-52

396

Standardizing instream flow requirements at hydropower projects in the Cascade Mountains, Washington  

DOE Green Energy (OSTI)

Instream flow requirements are common mitigation measures instituted in the bypassed reaches of hydroelectric diversion projects. Currently, there are two extremes among the ways to determine instream flow requirements: generic standard-setting methods and detailed, habitat-based, impact assessment methods such as the Instream Flow Incremental Methodology (IFIM). Data from streams in Washington state show a consistent pattern in the instream flow requirements resulting from the IFIM. This pattern can be used to refine the simpler standard-setting approaches and thereby provide better estimates of flow needs during early stages of project design.

Smith, I.M.; Sale, M.J.

1993-06-01T23:59:59.000Z

397

Property:EstimatedTimeMedian | Open Energy Information  

Open Energy Info (EERE)

EstimatedTimeMedian EstimatedTimeMedian Jump to: navigation, search Property Name EstimatedTimeMedian Property Type Quantity Description the median estimate of time required Use this type to enumerate a length of time. The default unit is the year. Acceptable units (and their conversions) are: 8766 hours,hour,h,H,Hour,Hours,HOUR,HOURS 365.25 days,day,d,Day,Days,D,DAY,DAYS 52.17857 weeks,week,w,Week,Weeks,W,WEEK,WEEKS 12 months,month,m,Month,Months,M,MONTH,MONTHS 1 years,year,y,Year,Years,Y,YEAR,YEARS Pages using the property "EstimatedTimeMedian" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey + 2.281542e-4 years2 hours 0.0833 days 0.0119 weeks 0.00274 months + A Acoustic Logs + 0.044 years385.92 hours 16.08 days 2.297 weeks 0.528 months +

398

Property:EstimatedTimeHigh | Open Energy Information  

Open Energy Info (EERE)

EstimatedTimeHigh EstimatedTimeHigh Jump to: navigation, search Property Name EstimatedTimeHigh Property Type Quantity Description the high estimate of time required Use this type to enumerate a length of time. The default unit is the year. Acceptable units (and their conversions) are: 8766 hours,hour,h,H,Hour,Hours,HOUR,HOURS 365.25 days,day,d,Day,Days,D,DAY,DAYS 52.17857 weeks,week,w,Week,Weeks,W,WEEK,WEEKS 12 months,month,m,Month,Months,M,MONTH,MONTHS 1 years,year,y,Year,Years,Y,YEAR,YEARS Pages using the property "EstimatedTimeHigh" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey + 3.422313e-4 years3 hours 0.125 days 0.0179 weeks 0.00411 months + A Acoustic Logs + 0.0881 years772.08 hours 32.17 days 4.596 weeks 1.057 months + Aerial Photography + 0.00548 years48 hours

399

Property:EstimatedTimeLow | Open Energy Information  

Open Energy Info (EERE)

EstimatedTimeLow EstimatedTimeLow Jump to: navigation, search Property Name EstimatedTimeLow Property Type Quantity Description the low estimate of time required Use this type to enumerate a length of time. The default unit is the year. Acceptable units (and their conversions) are: 8766 hours,hour,h,H,Hour,Hours,HOUR,HOURS 365.25 days,day,d,Day,Days,D,DAY,DAYS 52.17857 weeks,week,w,Week,Weeks,W,WEEK,WEEKS 12 months,month,m,Month,Months,M,MONTH,MONTHS 1 years,year,y,Year,Years,Y,YEAR,YEARS Pages using the property "EstimatedTimeLow" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey + 1.711157e-4 years1.5 hours 0.0625 days 0.00893 weeks 0.00205 months + A Acoustic Logs + 0.023 years201.36 hours 8.39 days 1.199 weeks 0.276 months + Aerial Photography + 2.737851e-4 years2.4 hours

400

Requirements model generation to support requirements elicitation: the Secure Tropos experience  

Science Conference Proceedings (OSTI)

In recent years several efforts have been devoted by researchers in the Requirements Engineering community to the development of methodologies for supporting designers during requirements elicitation, modeling, and analysis. However, these methodologies ... Keywords: Lightweight text analysis, Model generation

Nadzeya Kiyavitskaya; Nicola Zannone

2008-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Commercial Envelope Requirements of the 2009 IECC | Building Energy Codes  

NLE Websites -- All DOE Office Websites (Extended Search)

9 IECC 9 IECC This training provides an overview of the commercial envelope requirements of the 2009 International Energy Conservation Code. Estimated Length: 56 minutes Presenters: Eric Makela, Britt/Makela Group Original Webcast Date: Thursday, September 3, 2009 - 13:00 CEUs Offered: 1.0 AIA/CES LU (HSW); .10 CEUs towards ICC renewal certification. Course Type: Video Downloads: Video Transcript Presentation Slides Video Watch on YouTube Visit the BECP Online Training Center for instructions on how to obtain a certificate of completion. Building Type: Commercial Focus: Compliance Code Version: 2009 IECC Target Audience: Architect/Designer Builder Code Official Contractor Engineer State Official Contacts Web Site Policies U.S. Department of Energy USA.gov Last Updated: Thursday, June 28, 2012 - 15:52

402

Commercial Mechanical Requirements of the 2006 IECC | Building Energy Codes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 IECC 6 IECC This training provides an overview of the commercial mechanical requirements of the 2006 International Energy Conservation Code. Estimated Length: 58 minutes Presenters: Eric Makela, Britt/Makela Group Original Webcast Date: Thursday, June 22, 2006 - 13:00 CEUs Offered: 1.0 AIA/CES LU (HSW); .10 CEUs towards ICC renewal certification. Course Type: Video Downloads: Presentation Slides Video Watch on YouTube Visit the BECP Online Training Center for instructions on how to obtain a certificate of completion. Building Type: Commercial Focus: Compliance Code Version: 2006 IECC Target Audience: Architect/Designer Builder Code Official Contractor Engineer State Official Contacts Web Site Policies U.S. Department of Energy USA.gov Last Updated: Thursday, June 28, 2012 - 15:51

403

Residential Requirements of the 2009 IECC | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

09 IECC 09 IECC This training includes an overview of the residential requirements of the 2009 International Energy Conservation Code. Estimated Length: 1 hour, 9 minutes Presenters: Todd Taylor, Pacific Northwest National Laboratory Original Webcast Date: Tuesday, June 16, 2009 - 13:00 CEUs Offered: 1.0 AIA/CES LU (HSW); .10 CEUs towards ICC renewal certification. Course Type: Video Downloads: Video Transcript Presentation Slides Video Watch on YouTube Visit the BECP Online Training Center for instructions on how to obtain a certificate of completion. Building Type: Residential Focus: Compliance Code Version: 2009 IECC Target Audience: Architect/Designer Builder Code Official Contractor Engineer Federal Official State Official Contacts Web Site Policies U.S. Department of Energy

404

Selecting Efficient Phase Estimation With Constant-Precision Phase Shift Operators  

E-Print Network (OSTI)

We investigate the cost of three phase estimation procedures that require only constant-precision phase shift operators. The cost is in terms of the number of elementary gates, not just the number of measurements. Faster phase estimation requires the minimal number of measurements with a \\log * factor of reduction when the required precision n is large. The arbitrary constant-precision approach (ACPA) requires the minimal number of elementary gates with a minimal factor of 14 of reduction in comparison to Kitaev's approach. The reduction factor increases as the precision gets higher in ACPA. Kitaev's approach is with a reduction factor of 14 in comparison to the faster phase estimation in terms of elementary gate counts.

Chen-Fu Chiang

2013-06-12T23:59:59.000Z

405

Upper Estimates for Banach Spaces  

E-Print Network (OSTI)

We study the relationship of dominance for sequences and trees in Banach spaces. In the context of sequences, we prove that domination of weakly null sequences is a uniform property. More precisely, if $(v_i)$ is a normalized basic sequence and $X$ is a Banach space such that every normalized weakly null sequence in $X$ has a subsequence that is dominated by $(v_i)$, then there exists a uniform constant $C\\geq1$ such that every normalized weakly null sequence in $X$ has a subsequence that is $C$-dominated by $(v_i)$. We prove as well that if $V=(v_i)_{i=1}^\\infty$ satisfies some general conditions, then a Banach space $X$ with separable dual has subsequential $V$ upper tree estimates if and only if it embeds into a Banach space with a shrinking FDD which satisfies subsequential $V$ upper block estimates. We apply this theorem to Tsirelson spaces to prove that for all countable ordinals $\\alpha$ there exists a Banach space $X$ with Szlenk index at most $\\omega^{\\alpha \\omega +1}$ which is universal for all Banach spaces with Szlenk index at most $\\omega^{\\alpha\\omega}$.

Freeman, Daniel B.

2009-08-01T23:59:59.000Z

406

Interruption Cost Estimate Calculator | Open Energy Information  

Open Energy Info (EERE)

Interruption Cost Estimate Calculator Interruption Cost Estimate Calculator Jump to: navigation, search Tool Summary Name: Interruption Cost Estimate (ICE) Calculator Agency/Company /Organization: Freeman, Sullivan & Co. Sector: Energy Focus Area: Grid Assessment and Integration, Energy Efficiency Resource Type: Online calculator, Software/modeling tools User Interface: Website Website: icecalculator.com/ Country: United States Cost: Free Northern America References: [1] Logo: Interruption Cost Estimate (ICE) Calculator This calculator is a tool designed for electric reliability planners at utilities, government organizations or other entities that are interested in estimating interruption costs and/or the benefits associated with reliability improvements. About The Interruption Cost Estimate (ICE) Calculator is an electric reliability

407

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule  

Science Conference Proceedings (OSTI)

This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

Soli T. Khericha

2006-09-01T23:59:59.000Z

408

Sequence-Length Requirements for Phylogenetic Methods  

E-Print Network (OSTI)

We study the sequence lengths required by neighbor-joining, greedy parsimony, and a phylogenetic reconstruction method (DCM NJ +MP) based on disk-covering and the maximum parsimony criterion. We use extensive simulations based on random birth-death trees, with controlled deviations from ultrametricity, to collect data on the scaling of sequence-length requirements for each of the three methods as a function of the number of taxa, the rate of evolution on the tree, and the deviation from ultrametricity. Our experiments show that DCM NJ +MP has consistently lower sequence-length requirements than the other two methods when trees of high topological accuracy are desired, although all methods require much longer sequences as the deviation from ultrametricity or the height of the tree grows. Our study has significant implications for large-scale phylogenetic reconstruction (where sequence-length requirements are a crucial factor), but also for future performance analyses in phylogenetics (since deviations from ultrametricity are proving pivotal).

Bernard M. E. Moret; Usman Roshan; Tandy Warnow; Y Warnow

2002-01-01T23:59:59.000Z

409

Overview of the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 |  

NLE Websites -- All DOE Office Websites (Extended Search)

the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 Session 2 of a seven-part webcast series presented by the Department of Energy's (DOE's) Federal Energy Management Program to help federal agencies comply with the requirements of ASHRAE Standard 90.1-2004. The Overview of the Requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004 webcast is a re-broadcast of three webcasts-originally broadcast by DOE's Building Energy Codes Program in 2007. This training provides an overview of the building envelope, mechanical and service water heating, and lighting requirements in ASHRAE Standard 90.1-2004. Estimated Length: 4 hours Presenters: John Hogan, City of Seattle; Eric Richman, PNNL; Mark Hydeman, Taylor Engineering LLC. Original Webcast Date: Thursday, August 21, 2008 - 13:00

410

MRS Preliminary Site Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MRS Preliminary Site Requirements MRS Preliminary Site Requirements MRS Preliminary Site Requirements In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be

411

World nuclear fuel cycle requirements 1991  

Science Conference Proceedings (OSTI)

The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

Not Available

1991-10-10T23:59:59.000Z

412

Tracking Quintessence Would Require Two Cosmic Coincidences  

E-Print Network (OSTI)

Good tracking requires that the quintessence energy fraction slowly increase while the roll $\\lambda\\equiv -d\\ln V/\\varkappa d\\phi$ slowly decreases, but is not yet truly slow-rolling. The supernova bound on the present quintessence equation of state requires either (1) a cosmological constant or other fine-tuned "crawling quintessence" or (2) "roll-over quintessence" that tracked until recently, but now became slow rolling, because of a sharp increase in potential curvature. Thus, fine-tuning is required by constant equation of state and inverse power potentials, but can be avoided by the SUGRA and Skordis-Albrecht potentials and other good trackers, provided quintessence energy domination and slow roll {\\em both} began only recently. This makes the time in which we live special in {\\em two} respects.

Sidney Bludman

2004-03-22T23:59:59.000Z

413

NBP RFI: Communications Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements NBP RFI: Communications Requirements Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission substations connected via 1,300 miles of transmission lines, together feeding over 350 distribution substations,

414

Requirements for Wind Development | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Wind Development Requirements for Wind Development Requirements for Wind Development < Back Eligibility Commercial Construction Industrial Installer/Contractor Utility Savings Category Wind Buying & Making Electricity Program Info State Oklahoma Program Type Solar/Wind Permitting Standards In 2010, Oklahoma passed HB 2973, known as The Oklahoma Wind Energy Development Act. The bill becomes effective January 1, 2011. The Act provides sets rules for owners of wind energy facilities related to decommissioning, payments, and insurance. * Within one year of abandonment of a project, equipment from wind energy facilities must be removed and the land must be returned to its condition prior to the facility construction, except for roads. * After 15 years of operation, wind energy facility owners must file an

415

MRS Preliminary Site Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MRS Preliminary Site Requirements MRS Preliminary Site Requirements MRS Preliminary Site Requirements In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a monitored retrievable storage (MRS) facility that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from commercial nuclear power plants and provide a limited amount of storage for this spent fuel. When a geologic repository starts operations, the MRS facility will also stage spent-fuel shipments to the repository. By law, storage at the MRS facility is to be temporary, with permanent disposal provided in a geologic repository to be

416

Stack Height Requirements (Ohio) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) < Back Eligibility Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Ohio Program Type Environmental Regulations Provider Ohio Environmental Protection Agency This chapter of the law establishes that the Ohio Environmental Protection Agency provides regulations for stacks for industrial facilities. "Stack" means any chimney, flue, conduit or duct arranged to conduct any emissions to the ambient air, excluding flares. "Stack height" means the distance from the ground-level elevation at the base of the stack to the crown of the stack. If a stack arises from a building or other structure, the ground-level elevation of that building or structure will be

417

CONTENTS RESEARCH COMPLIANCE REPORTING REQUIREMENTS PARAGRAPH  

E-Print Network (OSTI)

1. PURPOSE. This Veterans Health Administration Handbook sets forth the requirements for reporting certain research events to facility officials, relevant research review committees, and the Office of Research Oversight (ORO). NOTE: This Handbook does not preempt or otherwise alter any other applicable research reporting requirements, whether within the Department of Veterans Affairs (VA) or involving other Federal or state agencies or commercial sponsors. 2. SUMMARY OF MAJOR CHANGES. This revised VHA Handbook: a. Provides clarifications and technical corrections to the previous version of the Handbook to specify requirements for reporting certain research events to facility officials, relevant research review committees, and the ORO. b. This Handbook assigns responsibilities related to reporting research events to the ORO,

Robert A. Petzel

2010-01-01T23:59:59.000Z

418

COBRA: A hybrid method for software cost estimation, benchmarking and risk assessment  

E-Print Network (OSTI)

Current cost estimation techniques have a number of drawbacks. For example, developing algorithmic models requires extensive past project data. Also, off-the-shelf models have been found to be difficult to calibrate but inaccurate without calibration. Informal approaches based on experienced estimators depend on estimators ’ availability and are not easily repeatable, as well as not being much more accurate than algorithmic techniques. In this paper we present a method for cost estimation that combines aspects of algorithmic and experiential approaches (referred to as COBRA, COst estimation, Benchmarking, and Risk Assessment). We find through a case study that cost estimates using COBRA show an average ARE of 0.09, and show that the results are easily usable for benchmarking and risk assessment purposes. 1

Lionel C. Bri; Lionel C. Bri; Khaled El Emam; Khaled El Emam; Frank Bomarius; Frank Bomarius

1998-01-01T23:59:59.000Z

419

Rainfall-Rate Estimation Using Gaussian Mixture Parameter Estimator: Training and Validation  

Science Conference Proceedings (OSTI)

This study develops a Gaussian mixture rainfall-rate estimator (GMRE) for polarimetric radar-based rainfall-rate estimation, following a general framework based on the Gaussian mixture model and Bayes least squares estimation for weather radar–...

Zhengzheng Li; Yan Zhang; Scott E. Giangrande

2012-05-01T23:59:59.000Z

420

Microsoft Word - S07566_Requirements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2012 LMS/FUSRAP/S07566 Rev. 1 This page intentionally left blank LMS/FUSRAP/S07566 Rev. 1 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2012 This page intentionally left blank U.S. Department of Energy LTS&M Requirements for Remediated FUSRAP Sites March 2012 Doc. No. S07566, Rev. 1 Page i Contents Executive Summary ....................................................................................................................... iii 1.0 Acid/Pueblo Canyon, New Mexico, Site ...............................................................................1

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Nuclear Power and the World's Energy Requirements  

E-Print Network (OSTI)

The global requirements for energy are increasing rapidly as the global population increases and the under-developed nations become more advanced. The traditional fuels used in their traditional ways will become increasingly unable to meet the demand. The need for a review of the energy sources available is paramount, although the subsequent need to develop a realistic strategy to deal with all local and global energy requirements is almost as important. Here attention will be restricted to examining some of the claims and problems of using nuclear power to attempt to solve this major question.

V. Castellano; R. F. Evans; J. Dunning-Davies

2004-06-10T23:59:59.000Z

422

Ootw Tool Requirements in Relation to JWARS  

Science Conference Proceedings (OSTI)

This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

Hartley III, D.S.; Packard, S.L.

1998-01-01T23:59:59.000Z

423

Passive incentive requirements: a regional assessment  

DOE Green Energy (OSTI)

The nation's goal of 20% solar contribution by the turn of the century will be achieved, in part, by the construction of residences heated by virtue of their passive solar designs. These designs are not economically competitive against all conventional fuels in all locations. Some degree of government incentive will be required to assure a competitive position for these designs. A methodology is presented which is used to assess the magnitude of the government incentive required to assure feasibility. The methodology is used to provide a regional assessment for the Pacific Northwest under alternative home ownership periods and conventional fuel types.

Ben-David, S.; Kirschner, C.; Noll, S.A.; Roach, F.

1980-01-01T23:59:59.000Z

424

Estimation of Convective Rainfall from Lightning Observations  

Science Conference Proceedings (OSTI)

The objective of this study is to develop a technique to use lightning observations for estimating convective rainfall. A framework for rainfall estimation is developed in which key elements are 1) the rainfall–lightning ratio, that is, the ...

Alberto Tapia; James A. Smith; Michael Dixon

1998-11-01T23:59:59.000Z

425

Estimates of Large Spectrum Width from Autocovariances  

Science Conference Proceedings (OSTI)

The authors demonstrate that there are maximum measurable (saturation) spectrum widths for standard autocovariance techniques, the 0,1-lag autocovariance estimator and the 1,2-lag estimator. The maximal mean measurable spectrum widths from the ...

Valery M. Melnikov; Dusan S. Zrni?

2004-06-01T23:59:59.000Z

426

Estimating UV Index Climatology over Canada  

Science Conference Proceedings (OSTI)

Hourly UV index values at 45 sites in Canada were estimated using a statistical relationship between UV irradiance and global solar radiation, total ozone, and dewpoint temperature. The estimation method also takes into account the enhancement of ...

V. E. Fioletov; J. B. Kerr; L. J. B. McArthur; D. I. Wardle; T. W. Mathews

2003-03-01T23:59:59.000Z

427

Prediction accuracy of link-quality estimators  

Science Conference Proceedings (OSTI)

The accuracy of link-quality estimators (LQE) is missioncritical in many application scenarios in wireless sensor networks (WSN), since the link-quality metric is used for routing decisions or neighborhood formation. Link-quality estimation must offer ...

Christian Renner; Sebastian Ernst; Christoph Weyer; Volker Turau

2011-02-01T23:59:59.000Z

428

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

429

Software Cost Estimation and Control  

E-Print Network (OSTI)

this report, provided that the source of such material is fully acknowledged. Additional copies are available free of charge from: Publication Office Institute for Information Technology National Research Council of Canada Ottawa, Ontario, Canada K1A 0R6 Copyright 1994 par Conseil national de recherches du Canada Il est permis de citer de courts extraits et de reproduire des figures ou tableaux du présent rapport, à condition d'en identifier clairement la source. Des exemplaires supplémentaires peuvent être obtenus gratuitement à l'addresse suivante: Bureau des publications Institut de technologie de l'information Conseil national de recherches du Canada Ottawa (Ontario) Canada K1A 0R6 Software Cost Estimation 1 Table of Contents

M. R. Vigder; A.W. Kark

1994-01-01T23:59:59.000Z

430

2007 Estimated International Energy Flows  

Science Conference Proceedings (OSTI)

An energy flow chart or 'atlas' for 136 countries has been constructed from data maintained by the International Energy Agency (IEA) and estimates of energy use patterns for the year 2007. Approximately 490 exajoules (460 quadrillion BTU) of primary energy are used in aggregate by these countries each year. While the basic structure of the energy system is consistent from country to country, patterns of resource use and consumption vary. Energy can be visualized as it flows from resources (i.e. coal, petroleum, natural gas) through transformations such as electricity generation to end uses (i.e. residential, commercial, industrial, transportation). These flow patterns are visualized in this atlas of 136 country-level energy flow charts.

Smith, C A; Belles, R D; Simon, A J

2011-03-10T23:59:59.000Z

431

Intermediate-Term Uranium Supply Curve Estimation  

Science Conference Proceedings (OSTI)

A study was undertaken to estimate U.S. natural uranium supply capacities and associated production costs over the period 1979-1990 and to develop the general supply outlook to 2000. Annual supply capacity schedules were estimated on an individual mill and mine family basis. Future production schedules were estimated by balancing estimated supply capacity with DOE's future demand projections; the impact of private-sector inventory levels was accounted for.

1981-02-01T23:59:59.000Z

432

Estimating Flexoelectric Properties of Piezoelectric Crystals  

Science Conference Proceedings (OSTI)

Energy Harvesting Utilized Resonance Phenomena of Piezoelectric Unimorph · Estimating Flexoelectric Properties of Piezoelectric Crystals: Utilization of a ...

433

Nonlinear spectral density estimation: thresholding the correlogram  

E-Print Network (OSTI)

in a nonlinear way. The rate of convergence of the new estimators is quantified, and practical issues estimation of the spectral density function; examples include astronomy, economics, electrical engineering Einstein (1914); see Brillinger (1993) for a historical perspective. The prevalent spectral estimation

Politis, Dimitris N.

434

New Methodology for Natural Gas Production Estimates  

Reports and Publications (EIA)

A new methodology is implemented with the monthly natural gas production estimates from the EIA-914 survey this month. The estimates, to be released April 29, 2010, include revisions for all of 2009. The fundamental changes in the new process include the timeliness of the historical data used for estimation and the frequency of sample updates, both of which are improved.

Information Center

2010-04-26T23:59:59.000Z

435

Skew estimation of document images using bagging  

Science Conference Proceedings (OSTI)

This paper proposes a general-purpose method for estimating the skew angles of document images. Rather than to derive a skew angle merely from text lines, the proposed method exploits various types of visual cues of image skew available in local image ... Keywords: bagging estimator, document image analysis, floating cascade, radon transform, skew estimation

Gaofeng Meng; Chunhong Pan; Nanning Zheng; Chen Sun

2010-07-01T23:59:59.000Z

436

Model Checking Complete Requirements Specifications Using Abstraction  

Science Conference Proceedings (OSTI)

Although model checking has proven remarkably effective in detecting errors in hardware designs, its success in the analysis of software specifications has been limited. Model checking algorithms for hardware verification commonly use Binary Decision ... Keywords: SCR, abstraction, model checking, requirements specification, verification

Ramesh Bharadwaj; Constance L. Heitmeyer

1999-01-01T23:59:59.000Z

437

Hoisting and Rigging: Inspection and Maintenance Requirements  

E-Print Network (OSTI)

Devices, Slings, and Rigging Hardware and Accessories (SLAC-I-730-0A21S-036) Hoisting and Rigging: PreHoisting and Rigging: Inspection and Maintenance Requirements URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/hoisting Department: Field Safety and Building Inspection Program: Hoisting and Rigging Authority: ESH Manual, Chapter

Wechsler, Risa H.

438

THE REQUIREMENTS OF A FUSION DEMONSTRATION  

E-Print Network (OSTI)

, that are predicted by theory but are not yet well established experimentally. The two reactors will have the same of the commercial nuclear power business or construction of a new production reactor based on HTGR technology#12;THE REQUIREMENTS OF A FUSION DEMONSTRATION REACTOR AND THE STARLITE STUDY Robert W. Conn

Najmabadi, Farrokh

439

A requirements catalog for mobile learning environments  

Science Conference Proceedings (OSTI)

Mobile learning (m-learning) can be characterized by the ability to promote a strong interaction among apprentices and tutors, assuring greater motivation, convenience and flexibility to the learning process. Mobile learning environments have emerged ... Keywords: mobile learning, prioritization, requirements, systematic review

Nemésio Freitas Duarte Filho; Ellen Francine Barbosa

2013-03-01T23:59:59.000Z

440

CELL, MOLECULAR AND DEVELOPMENTAL BIOLOGY Graduation Requirements  

E-Print Network (OSTI)

CELL, MOLECULAR AND DEVELOPMENTAL BIOLOGY Graduation Requirements: A minimum 2.0 average in all in Biology III: Cell Structure and Function (2 cr.; fall) 6. BIOL 24100 Biology IV: Genetics and Molecular Biology (3 cr.; spring) 7. BIOL 24200 Laboratory in Genetics and Molecular Biology (2 cr.; spring) 8. BIOL

Jiang, Wen

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

PCB spill response and notification requirements  

SciTech Connect

Polychlorinated biphenyls (PCBs) are a class of organic chemicals that had become widely used in industrial applications due to their practical physical and chemical properties. Historical uses of PCBs include dielectric fluids (used in utility transformers, capacitors, etc.), hydraulic fluids, and other applications requiring stable, fire-retardant materials. Due to findings that PCBs may cause adverse health effects and due to their persistence and accumulation in the environment. The Toxic Substances Control Act (TSCA), enacted on october 11, 1976, banned the manufacture of PCBs after 1978 [Section 6(e)]. The first PCB regulations, promulgated at 40 CFR Part 761, were finalized on February 17, 1978. These PCB regulations include requirements specifying disposal methods and marking (labeling) procedures, and controlling PCB use. To assist the Department of Energy (DOE) in its efforts to comply with the TSCA statute and implementing regulations, the Office of Environmental Guidance has prepared the document ``Guidance on the Management of Polychlorinated Biphenyls (PCBs).`` That document explains the requirements specified in the statute and regulations for managing PCBs including PCB use, storage, transport, and disposal. The Environmental Protection Agency (EPA) established regulations at 40 CFR 761 Subpart G for the reporting and cleanup of spills resulting from the release of any quantity of material containing PCBs at concentrations of {ge} 50 ppm. The regulations, known collectively as the TSCA Spill Cleanup Policy, contain requirements for the notification, cleanup, decontamination verification, and recordkeeping of PCB spills. This Information Brief supplements the PCB guidance document by responding to common questions concerning PCB spill response and notification requirements. It is one of a series of Information Briefs pertinent to PCB management issues.

NONE

1994-12-01T23:59:59.000Z

442

Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements in DOE O 5480.19, Conduct of Operations Requirements Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. Requirements in DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities Cross-referenced to DOE O 422.1, Conduct of Operations. This is an open-book evaluation. Complete the questions, and submit your answers (hand-written or electronically) to the Training Center. Someone will check and grade your answers. If you achieve a score of at least 80%, you will receive a completion certificate. Nuclear Facility Safety Basis Fundamentals Self-Study Guide Review Questions More Documents & Publications U.S. Department of Energy Oak Ridge Operations Nuclear Facility Safety Basis Fundamentals, Self-Study Guide

443

DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY...

444

DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS: CA DOE CYBER SECURITY EBK: CORE COMPETENCY TRAINING REQUIREMENTS. Key Cyber...

445

Large Scale Computing and Storage Requirements for Fusion Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Fusion Energy Sciences (FES) Large Scale Computing and Storage Requirements for Fusion Energy...

446

Audit of Staffing Requirements for the Strategic Petroleum Reserve...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staffing Requirements for the Strategic Petroleum Reserve, IG-0370 Audit of Staffing Requirements for the Strategic Petroleum Reserve, IG-0370 Audit of Staffing Requirements for...

447

Education, Job Requirements, and Commuting: An Analysis of Network Flows  

E-Print Network (OSTI)

Education, Job Requirements,and Commuting: Analysis of Ne~f,,/ Education, Job Requirements, and Commuting: Analysis ofin Education, Job Requirements, and Commuting: Analysis of

Harsman, Bjorn; Quigley, John M.

1998-01-01T23:59:59.000Z

448

Large Scale Computing and Storage Requirements for Basic Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

at NERSC HPC Requirements Reviews Requirements for Science: Target 2014 Basic Energy Sciences (BES) Large Scale Computing and Storage Requirements for Basic Energy...

449

Applications of Cermets to Meet Operational Waste Package Requirements  

NLE Websites -- All DOE Office Websites (Extended Search)

Operational Waste Package Requirements Applications of Cermets to Meet Operational Waste Package Requirements The cermet could meet three operational requirements for the waste...

450

Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements  

SciTech Connect

This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

Custer, W.R. Jr.; Messick, C.D.

1996-03-31T23:59:59.000Z

451

FES Science Network Requirements - Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008  

Science Conference Proceedings (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In March 2008, ESnet and the Fusion Energy Sciences (FES) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the FES Program Office. Most sites that conduct data-intensive activities (the Tokamaks at GA and MIT, the supercomputer centers at NERSC and ORNL) show a need for on the order of 10 Gbps of network bandwidth for FES-related work within 5 years. PPPL reported a need for 8 times that (80 Gbps) in that time frame. Estimates for the 5-10 year time period are up to 160 Mbps for large simulations. Bandwidth requirements for ITER range from 10 to 80 Gbps. In terms of science process and collaboration structure, it is clear that the proposed Fusion Simulation Project (FSP) has the potential to significantly impact the data movement patterns and therefore the network requirements for U.S. fusion science. As the FSP is defined over the next two years, these changes will become clearer. Also, there is a clear and present unmet need for better network connectivity between U.S. FES sites and two Asian fusion experiments--the EAST Tokamak in China and the KSTAR Tokamak in South Korea. In addition to achieving its goal of collecting and characterizing the network requirements of the science endeavors funded by the FES Program Office, the workshop emphasized that there is a need for research into better ways of conducting remote collaboration with the control room of a Tokamak running an experiment. This is especially important since the current plans for ITER assume that this problem will be solved.

Tierney, Brian; Dart, Eli; Tierney, Brian

2008-07-10T23:59:59.000Z

452

Estimating the Time Dependence of Air Temperature Using Daily Maxima and Minima: A Comparison of Three Methods  

Science Conference Proceedings (OSTI)

Many models in a variety of disciplines require air temperature throughout the day as an input, yet often the only data available are daily extrema. Several methods for estimating the diurnal change in temperature from daily extrema have been ...

J. M. Baker; D. C. Reicosky; D. G. Baker

1988-12-01T23:59:59.000Z

453

Estimation of the North–South Transect of Eastern China forest biomass using remote sensing and forest inventory data  

Science Conference Proceedings (OSTI)

The assessment of forest biomass is required for the estimation of carbon sinks and a myriad other ecological and environmental factors. In this article, we combined satellite data Thematic Mapper TM and Moderate Resolution Imaging Spectrometer MODIS, ...

Yanhua Gao, Xinxin Liu, Chengcheng Min, Honglin He, Guirui Yu, Min Liu, Xudong Zhu, Qiao Wang

2013-08-01T23:59:59.000Z

454

Marking Requirements | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

Submittal Basics Submittal Basics Marking Requirements Print page Print page Email page Email page Categories of Controlled Unclassified STI DOE and Major Site/Facility Management Contractors Sample Cover and Title Page for Unclassified Unlimited STI Sample Cover and Title Page for Controlled Unclassified STI Financial Assistance Recipients and Non-major Contractors Sample Cover and Title Page for Unclassified Unlimited STI Sample Cover and Title Page for Controlled Unclassified STI Resources for classified and controlled unclassified marking requirements: DOE CMPC Marking Resource DOE O 475.2A, Identifying Classified Information 10 CFR 1017, Identification and Protection of Unclassified Controlled Nuclear Information DOE M 471.3-1, Manual for Identifying and Protecting Official Use

455

Depleted Uranium Uses: Regulatory Requirements and Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Depleted Uranium Uses Depleted Uranium Uses Regulatory Requirements Regulatory Requirements and Issues and Issues Nancy L. Ranek Nancy L. Ranek Argonne National Laboratory Argonne National Laboratory August 5, 1998 August 5, 1998 Beneficial Reuse '98 Beneficial Reuse '98 Knoxville, TN Knoxville, TN NOTES Work Performed for: Office of Facilities (NE-40) Office of Nuclear Energy, Science and Technology U.S. Department of Energy Work Performed by: Environmental Assessment Division Argonne National Laboratory 955 L'Enfant Plaza North, S.W. Washington, D.C. 20024 Phone: 202/488-2417 E-mail: ranekn@smtplink.dis.anl.gov 2 2 2 Programmatic Environmental Programmatic Environmental Impact Statement (PEIS) Impact Statement (PEIS) Draft PEIS Published 12/97 * Preferred Alternative = 100% Use

456

Documentation Requirements for Pressurized Experiment Equipment  

NLE Websites -- All DOE Office Websites (Extended Search)

Documentation Requirements for Pressurized Experiment Apparatus Documentation Requirements for Pressurized Experiment Apparatus PSSC NOTE01 15-Jan-2013 When bringing a piece of apparatus to the APS for an experiment that will involve pressure, whether it is to be used on a beamline during a measurement or in a laboratory to prepare the sample prior to the experiment, the hazards associated with the equipment must be reviewed. To review the equipment and make any recommendations, a certain level of documentation must be provided by the experimenter. The length and depth of the documentation should be commensurate with the complexity of the system. 1. Description of apparatus a. Description of the assembly and operation of the system. b. State the maximum working pressure, working fluid (liquid or gas) used to

457

Federal Prison Industries-Requirement for Market  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH 2004-12 FLASH 2004-12 April 5, 2004 Federal A4:Quisition Circular (FAC) 2001-21 The following item is available via the internet at httQ://WWVv .acQnet.gov/farlF AC/fac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required Sources of Supplies and Services, 19, Small I~usiness Programs, 42, Contract Administration and Audit Services, and 52, Solicitation Provisions and Contract Clauses. This rule pJ'Ovides that no appropriated funds may be expended for the purchase of products or services offered by the Federal Prison Industries, Inc. (FPI), unless the agency ma1.:ing the purchase determines that the offered product or service provides the best value to the buying agency in accordance with the applicable procurement

458

Hydrogen Storage Requirements for Fuel Cell Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

GENERAL MOTORS GENERAL MOTORS HYDROGEN STORAGE REQUIREMENTS FOR FUEL CELL VEHICLES Brian G. Wicke GM R&D and Planning DOE Hydrogen Storage Workshop August 14-15, 2002 Argonne National Laboratory General Motors Fuel Cell Vehicles * GM fuel cell vehicle Goal - be the first to profitably sell one million fuel cell vehicles * Fuel cell powerplant must be suitable for a broad range of light-duty vehicles (not just niche) * UNCOMPROMISED performance & reliability are REQUIRED * SAFETY IS A GIVEN * Evolutionary and Revolutionary vehicle designs are included-GM AUTONOMY-as long as the customer is (more than) satisfied GENERAL MOTORS AUTONOMY GENERAL MOTORS AUTONOMY General Motors Fuel Cell Vehicles * Focus on PEM fuel cell technology * Must consider entire hydrogen storage & (unique) fuel delivery systems,

459

API Requirements for Dynamic Graph Prediction  

SciTech Connect

Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

Gallagher, B; Eliassi-Rad, T

2006-10-13T23:59:59.000Z

460

RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE  

Science Conference Proceedings (OSTI)

Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

Watkins, R.; Leduc, D.

2011-03-24T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Report of the Federal Internetworking Requirements Panel  

SciTech Connect

The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

1994-05-31T23:59:59.000Z

462

Heisenberg-limited estimation of losses with non-Gaussian states  

E-Print Network (OSTI)

We address the estimation of the loss parameter of a bosonic channel probed by arbitrary signals. Unlike the optimal Gaussian probes, which can attain the ultimate bound on precision asymptotically either for very small or very large losses, we prove that Fock states at any fixed photon number saturate the bound unconditionally for any value of the loss. Photon counting is thus sufficient to obtain minimum-error estimation. In the relevant regime of low-energy probes, we demonstrate that physically realizable superpositions of the first low-lying Fock states yield an absolute improvement over any Gaussian probe. Such few-photon states can be recast quite generally as truncations of de-Gaussified photon subtracted states. Besides proving that truly optimal estimation of bosonic loss requires non-Gaussian signals for any energy of the probe signal, our results allow for a tangible technological simplification in implementing the optimal estimation strategy, compared to the quite demanding one required for Gauss...

Adesso, G; De Siena, S; Illuminati, F; Souza, L A M

2008-01-01T23:59:59.000Z

463

AMI Risk Assessment and Security Requirements  

Science Conference Proceedings (OSTI)

Advanced Metering Infrastructure (AMI) is a transforming technology that has broad impact on the energy market and its consumers. AMI allows utilities to balance supply, demand, and capacity making a smarter, more efficient, grid by pushing aspects of grid monitoring and control out to the endpoints of delivery. Stakeholders are implementing the systems and technologies required to deploy AMI today. AMI systems promise to provide advanced energy monitoring and recording, sophisticated tariff/rate program...

2009-12-18T23:59:59.000Z

464

Methodology for assessing systems materials requirements  

SciTech Connect

A potential stumbling block to new system planning and design is imprecise, confusing, or contradictory data regarding materials - their availability and costs. A methodology is now available that removes this barrier by minimizing uncertainties regarding materials availability. Using this methodology, a planner can assess materials requirements more quickly, at lower cost, and with much greater confidence in the results. Developed specifically for energy systems, its potential application is much broader. This methodology and examples of its use are discussed.

Culver, D.H.; Teeter, R.R.; Jamieson, W.M.

1980-01-01T23:59:59.000Z

465

Robust Talker Direction Estimation Based on Weighted CSP Analysis and Maximum Likelihood Estimation  

Science Conference Proceedings (OSTI)

This paper describes a new talker direction estimation method for front-end processing to capture distant-talking speech by using a microphone array. The proposed method consists of two algorithms: One is a TDOA (Time Delay Of Arrival) estimation algorithm ... Keywords: robust talker direction estimation, CSP analysis, CSP coefficient subtraction, ML estimation, microphone array

Yuki Denda; Takanobu Nishiura; Yoichi Yamashita

2006-03-01T23:59:59.000Z

466

Quality Assurance requirements - Safety Analysis Reports for Packaging. An effective approach in developing QA requirements  

SciTech Connect

Application of QA requirements for packaging and transportation of radioactive materials should not be solely based on safety-related considerations. The operability of items, components, and systems must be considered as equally important. The nuclear industry has begun to recognize operability considerations along with safety concerns. This has resulted in a new approach in establishing QA requirements for packaging.

Fabian, R.R.

1986-01-01T23:59:59.000Z

467

Building Envelope Requirements Overview Page 3-1 3 Building Envelope Requirements  

E-Print Network (OSTI)

. For the building envelope, field verification and diagnostic testing procedures exist for insulation qualityBuilding Envelope Requirements ­ Overview Page 3-1 3 Building Envelope Requirements The building. The principal components of heating loads are building envelope infiltration as well as conduction losses

468

Marin County - Green Building Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marin County - Green Building Requirements Marin County - Green Building Requirements Eligibility Commercial Construction Residential Savings For Heating & Cooling Home...

469

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

470

Application Filing Requirements for Natural Gas Pipeline Construction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin) Application Filing Requirements for Natural Gas Pipeline Construction Projects...

471

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

472

Optimal state estimation for improved power measurements and model verification: Theory  

Science Conference Proceedings (OSTI)

To improve energy efficiency in computer systems and data centers, accurate models of the power consumption are needed for analysis and advanced control algorithms. Developing models requires deep understanding not only of the components themselves but ... Keywords: system level model analysis, energy efficiency, optimal state estimation, improved power measurement, computer systems, data centers, power consumption, mathematical methods, sensor fusion, data center powering structure, cooling system, parameter identifying estimator, model parameter

T. Malkamaki; S. J. Ovaska

2011-07-01T23:59:59.000Z

473

Reliability Estimates for Power Supplies  

Science Conference Proceedings (OSTI)

Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

Lee C. Cadwallader; Peter I. Petersen

2005-09-01T23:59:59.000Z

474

Office Buildings: Developer's Requirements- Consultant's Solutions  

E-Print Network (OSTI)

Sustainability has recently become a recognized feature in office developments. This lecture will focus on the motivation for a developer to introduce sustainability to a project and also on the approach of MEP consultants to match the new requirements. From a developers point of view many design decisions are based on cost issues. If “sustainable systems” match or exceed other solutions in terms of low investment costs, minimal space requirements or operating costs it is very likely for these systems to be introduced to projects. With the recent interest of tenants in “green issues” sustainability is now also being used as a marketing point for developments. This new market interest has arrived from almost no-where. In a market research from Vivico from (2004) our “typical” tenant did not show any great interest in ecological issues. These new requirements in general demand a quick adaption from investors. Vivico has always shown a great commitment to sustainability. Our track record shows a sound knowledge with technical solution such as geothermal energy systems or developments following comprehensive sustainability criteria from the scheme design through to fit-out. Vivico was also involved in pilot certifications for the German EnEV (European directive on energy performance of buildings. Another important motivation for energy-saving solutions are new government regulations, such as the German EnEV. The focus within project developments is to achieve good energy rating. Unfortunately, the government’s perspective of the EnEV is based on an overall value, the primary energy consumption of a building. As for example the primary energy factor in case of district heating is very much dependant on the “energy quality” of local utility suppliers, this overall value of the EnEV is not only dependant on the commitment of an investor to energy-saving solutions, but also to factors outside his reach. In order to be able to introduce even more “sustainability” to projects, some current problems have to overcome. German legal requirements define summer indoor temperatures and a noncompliance can lead to rent reductions or lease terminations. A softer approach as far as defining temperatures in working environments is concerned could help introduce other energy-saving systems. Some tenant target temperatures are even fixed within the lease contract over and above the legal requirements. If more of our tenants understood the impact of such requirements, provisions for overcapacity within cooling systems could be reduced. The technical part of the lecture gives a brief overview of current options to reach energy efficient and sustainable building solutions. It will be distinguished between active and passive means; for example the reduction of energy usage by using good building design concepts, or using natural resources and highly efficient building technologies to save fossil fuels. New technologies will also be highlighted with a view to future developments. Based on the various options described, a current Vivico Real Estate development, with Ebert- Ingenieure as their MEP-consultants, will be presented. The design process from the first steps and considerations through to the final solutions will be described.

Forster, P.; Arndt, J.

2008-10-01T23:59:59.000Z

475

"Table A52. Nonswitchable Minimum Requirements and Maximum Consumption"  

U.S. Energy Information Administration (EIA) Indexed Site

2. Nonswitchable Minimum Requirements and Maximum Consumption" 2. Nonswitchable Minimum Requirements and Maximum Consumption" " Potential by Census Region, 1991" " (Estimates in Physical Units)" ,,,,"RSE" ,"Actual","Minimum","Maximum","Row" "Type of Energy","Consumption","Consumption(a)","Consumption(b)","Factors" "RSE Column Factors:",1,1.2,0.8 ," Total United States" ,"-","-","-" "Electricity Receipts(c) (million kilowatthours)",718480,701478,766887,2 "Natural Gas (billion cubic feet)",5345,3485,5887,2 "Distillate Fuel Oil (thousand barrels)",23885,19113,201081,3.7 "Residual Fuel Oil (thousand barrels)",65837,36488,201921,2.6

476

NERSC-BES-Requirements-Yelick10.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Basic Energy Basic Energy Science Research Katherine Yelick NERSC Director Requirements Workshop NERSC Mission Accelerate the pace of scientific discovery for all DOE Office of Science (SC) research through computing and data systems and services. Efficient algorithms + flexible software + effective machines great computational science. 2 2010 Allocations NERSC is the Production Facility for DOE Office of Science * NERSC serves a large population Approximately 3000 users, 400 projects, 500 code instances * Focus on "unique" resources - Expert consulting and other services - High end computing systems - High end storage systems - Interface to high speed networking * Science-driven - Machine procured competitively using

477

Bethel-ASCR-Requirements-CaseStudy.ppt  

NLE Websites -- All DOE Office Websites (Extended Search)

Visual Data Analysis Visual Data Analysis Computational Requirements E. Wes Bethel 5 January 2011 Oakland, CA 2 Visual Data Analysis?  Visualization: transformation of data into images.  Visual data analysis: * Reflects one of three different visualization use models: * Exploratory, analytical, presentation. www.vacet. org Map of the Problem Space Experiment Simulation Data Analysis Results Filter, feature detection, search, subset, transform, visualize. Images, movies, data, decisions, knowledge. Raw data files, metadata, location transparency, single project, community repositories. Workflow High Performance I/O Libraries, Data Models Berkeley Lab Visualization Group Mission  Enable scientific knowledge discovery through the research, development, deployment, and application of visual data

478

URAT: astrometric requirements and design history  

E-Print Network (OSTI)

The U.S. Naval Observatory Robotic Astrometric Telescope (URAT) project aims at a highly accurate (5 mas), ground-based, all-sky survey. Requirements are presented for the optics and telescope for this 0.85 m aperture, 4.5 degree diameter field-of-view, specialized instrument, which are close to the capability of the industry. The history of the design process is presented as well as astrometric performance evaluations of the toleranced, optical design, with expected wavefront errors included.

N. Zacharias; U. Laux; A. Rakich; H. Epps

2006-06-08T23:59:59.000Z

479

Feedback Requirements for SASE-FELs  

SciTech Connect

The operation of a Self Amplified Spontaneous Emission (SASE) Free Electron Lasers (FEL) at soft and hard X-ray wavelengths driven by a high brightness electron beam imposes strong requirements on the stability of the accelerator and feedback systems are necessary to both guarantee saturation of the SASE process as well as a stable photon beam for user experiments. Diagnostics for the relevant transverse and longitudinal beam parameters are presented and various examples of feedback systems for bunches with low repetition rate as well as systems for intra bunch train feedbacks are discussed.

Loos, Henrik; /SLAC

2012-07-06T23:59:59.000Z

480

10 CFR 850 Implementation of Requirements  

Science Conference Proceedings (OSTI)

10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPP is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures that ES&H practices across LLNL are developed in a consistent manner. Other implementing documents, such as the ES&H Manual, are integral in effectively implementing 10 CFR 850.

Lee, S

2012-01-05T23:59:59.000Z

Note: This page contains sample records for the topic "required low-end estimate" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Resources required for topological quantum factoring  

Science Conference Proceedings (OSTI)

We consider a hypothetical topological quantum computer composed of either Ising or Fibonacci anyons. For each case, we calculate the time and number of qubits (space) necessary to execute the most computationally expensive step of Shor's algorithm, modular exponentiation. For Ising anyons, we apply Bravyi's distillation method [S. Bravyi, Phys. Rev. A 73, 042313 (2006)] which combines topological and nontopological operations to allow for universal quantum computation. With reasonable restrictions on the physical parameters we find that factoring a 128-bit number requires approximately 10{sup 3} Fibonacci anyons versus at least 3x10{sup 9} Ising anyons. Other distillation algorithms could reduce the resources for Ising anyons substantially.

Baraban, M. [Department of Physics, Yale University, 217 Prospect Street, New Haven, Connecticut 06511 (United States); Bonesteel, N. E. [Department of Physics and National High Magnetic Field Laboratory, Florida State University, Tallahassee, Florida 32310 (United States); Simon, S. H. [Rudolf Peierls Centre for Theoretical Physics, Oxford University, 1 Keble Road, Oxford OX1 3NP (United Kingdom)

2010-06-15T23:59:59.000Z

482

Defining Requirements for Improved Photovoltaic System Reliability  

DOE Green Energy (OSTI)

Reliable systems are an essential ingredient of any technology progressing toward commercial maturity and large-scale deployment. This paper defines reliability as meeting system fictional requirements, and then develops a framework to understand and quantify photovoltaic system reliability based on initial and ongoing costs and system value. The core elements necessary to achieve reliable PV systems are reviewed. These include appropriate system design, satisfactory component reliability, and proper installation and servicing. Reliability status, key issues, and present needs in system reliability are summarized for four application sectors.

Maish, A.B.

1998-12-21T23:59:59.000Z

483

State energy data report 1994: Consumption estimates  

Science Conference Proceedings (OSTI)

This document provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), operated by EIA. SEDS provides State energy consumption estimates to members of Congress, Federal and State agencies, and the general public, and provides the historical series needed for EIA`s energy models. Division is made for each energy type and end use sector. Nuclear electric power is included.

NONE

1996-10-01T23:59:59.000Z

484

Estimates of fission yields in nuclear criticality excursions  

SciTech Connect

There is a need for computer simulation of hypothetical criticality excursions involving significant quantities of fissionable materials, especially in fissile aqueous system. The need arises due to the requirements for the emergency planning of facilities where the fissionable materials are handled, processed, or stored; and the regulatory requirements associated with facility operation or conversion. It is proposed here that a data base of fission yeilds for critical experiments and known accidents (both aqueous and solid) should be generated by using existing or new computer codes. The success in compiling this data base would provide useful source-terms for criticality excursions, realistic estimates of emergency-response boundary, as well as a replacement for the ``rule-of-thumb`` or ``bounding`` method. 10 refs.

Choi, J.S. [Lawrence Livermore National Lab., CA (United States); Thompson, J.W. [Atlantic Nuclear Services, Ottawa, ON (Canada); Reed, R. [Westinghouse Savannah River Co., Aiken, SC (United States)

1995-06-01T23:59:59.000Z

485

A method for determining the spent-fuel contribution to transport cask containment requirements  

Science Conference Proceedings (OSTI)

This report examines containment requirements for spent-fuel transport containers that are transported under normal and hypothetical accident conditions. A methodology is described that estimates the probability of rod failure and the quantity of radioactive material released from breached rods. This methodology characterizes the dynamic environment of the cask and its contents and deterministically models the peak stresses that are induced in spent-fuel cladding by the mechanical and thermal dynamic environments. The peak stresses are evaluated in relation to probabilistic failure criteria for generated or preexisting ductile tearing and material fractures at cracks partially through the wall in fuel rods. Activity concentrations in the cask cavity are predicted from estimates of the fraction of gases, volatiles, and fuel fines that are released when the rod cladding is breached. Containment requirements based on the source term are calculated in terms of maximum permissible volumetric leak rates from the cask. Calculations are included for representative cask designs.

Sanders, T.L.; Seager, K.D. [Sandia National Labs., Albuquerque, NM (United States); Rashid, Y.R.; Barrett, P.R. [ANATECH Research Corp., La Jolla, CA (United States); Malinauskas, A.P. [Oak Ridge National Lab., TN (United States); Einziger, R.E. [Pacific Northwest Lab., Richland, WA (United States); Jordan, H. [EG and G Rocky Flats, Inc., Golden, CO (United States). Rocky Flats Plant; Duffey, T.A.; Sutherland, S.H. [APTEK, Inc., Colorado Springs, CO (United States); Reardon, P.C. [GRAM, Inc., Albuquerque, NM (United States)

1992-11-01T23:59:59.000Z

486

Passive NMIS Measurements to Estimate the Shape of Plutonium Assemblies  

SciTech Connect

A new technique to estimate the shape attribute of plutonium assemblies using the Nuclear Materials Identification System (NMIS) is described. The proposed method possesses a number of advantages. It is passive no external radiation source is required to estimate the shape of plutonium assemblies. Instead, inherent gamma and neutron emissions from spontaneous fission of {sup 240}Pu and subsequent induced fission of {sup 239}Pu are detected to estimate the shape attribute. The technique is also stationary: shape is estimated without scanning the assembly by moving the detectors relative to the assembly. The proposed method measures third order correlations between triplets of gamma/neutron-sensitive detectors. The real coincidence of a pair of gammas is used as a ''trigger'' to approximately identify the time of a spontaneous or induced fission event. The spatial location of this fission event is inferred from the real coincidence of a subsequent neutron with the initial pair of correlated gammas by using the neutron's time-of-flight (approximately the delay between the gamma pair and the neutron) and the fission neutron spectra of {sup 240}Pu and {sup 239}Pu. The spatial distribution of fission sites and hence the approximate shape of the plutonium assembly is thereby inferred by measuring the distribution of a large number of these correlated triplets. Proof-of-principle measurements were performed using {sup 252}Cf as a surrogate for {sup 240}Pu to demonstrate that the technique is feasible. For the simple shapes approximated with {sup 252}Cf sources, the measurements showed that the proposed method is capable of correctly identifying the shape and accurately estimating its size to within a few percent of actual.

Mattingly, J.K.; Chiang, L.G.; March-Leuba, J.A.; Mihalczo, J.T.; Mullens, J.A.; Perez, R.B.; Valentine, T.E.

1999-07-22T23:59:59.000Z

487

Guidance on Utility Rate Estimations and Weather Normalization in an ESPC  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance on Utility Rate Estimations and Weather Normalization in an ESPC Guidance on Utility Rate Estimations and Weather Normalization in an ESPC Subject: The use of estimated energy rates 1 and normalized weather 2 data in determining contractor (ESCO) payments under an energy savings performance contract (ESPC). Summary: As explained below, the use of estimated energy rates and normalized weather data is permitted when determining ESCO payments under an ESPC. Authority: The authority for ESPCs is established in the National Energy Conservation Policy Act (NECPA), as amended. (42 U.S.C. 8287 et seq.) Implementing regulations for ESPCs are at 10 CFR Part 436 subpart B. Guidance: Section 801(a)(2)(B) of NECPA requires that "[a]aggregate annual payments by an agency ... may not exceed the amount ... the agency would have paid (as estimated

488

Estimation of soil moisture in paddy field using Artificial Neural Networks  

E-Print Network (OSTI)

In paddy field, monitoring soil moisture is required for irrigation scheduling and water resource allocation, management and planning. The current study proposes an Artificial Neural Networks (ANN) model to estimate soil moisture in paddy field with limited meteorological data. Dynamic of ANN model was adopted to estimate soil moisture with the inputs of reference evapotranspiration (ETo) and precipitation. ETo was firstly estimated using the maximum, average and minimum values of air temperature as the inputs of model. The models were performed under different weather conditions between the two paddy cultivation periods. Training process of model was carried out using the observation data in the first period, while validation process was conducted based on the observation data in the second period. Dynamic of ANN model estimated soil moisture with R2 values of 0.80 and 0.73 for training and validation processes, respectively, indicated that tight linear correlations between observed and estimated values of s...

Arif, Chusnul; Setiawan, Budi Indra; Doi, Ryoichi

2013-01-01T23:59:59.000Z

489

Guidance on Utility Rate Estimations and Weather Normalization in an ESPC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on Utility Rate Estimations and Weather Normalization in an ESPC Guidance on Utility Rate Estimations and Weather Normalization in an ESPC Subject: The use of estimated energy rates 1 and normalized weather 2 data in determining contractor (ESCO) payments under an energy savings performance contract (ESPC). Summary: As explained below, the use of estimated energy rates and normalized weather data is permitted when determining ESCO payments under an ESPC. Authority: The authority for ESPCs is established in the National Energy Conservation Policy Act (NECPA), as amended. (42 U.S.C. 8287 et seq.) Implementing regulations for ESPCs are at 10 CFR Part 436 subpart B. Guidance: Section 801(a)(2)(B) of NECPA requires that "[a]aggregate annual payments by an agency ... may not exceed the amount ... the agency would have paid (as estimated

490

Routine inspection effort required for verification of a nuclear material production cutoff convention  

SciTech Connect

Preliminary estimates of the inspection effort to verify a Nuclear Material Cutoff Convention are presented. The estimates are based on (1) a database of about 650 facilities a total of eight states, i.e., the five nuclear-weapons states and three ``threshold`` states; (2) typical figures for inspection requirements for specific facility types derived from IAEA experience, where applicable; and (3) alternative estimates of inspection effort in cutoff options where full IAEA safeguards are not stipulated. Considerable uncertainty must be attached to the effort estimates. About 50--60% of the effort for each option is attributable to 16 large-scale reprocessing plants assumed to be in operation in the eight states; it is likely that some of these will be shut down by the time the convention enters into force. Another important question involving about one third of the overall effort is whether Euratom inspections in France and the U.K. could obviate the need for full-scale IAEA inspections at these facilities. Finally, the database does not yet contain many small-scale and military-related facilities. The results are therefore not presented as predictions but as the consequences of alternative assumptions. Despite the preliminary nature of the estimates, it is clear that a broad application of NPT-like safeguards to the eight states would require dramatic increases in the IAEA`s safeguards budget. It is also clear that the major component of the increased inspection effort would occur at large reprocessing plants (and associated plutonium facilities). Therefore, significantly bounding the increased effort requires a limitation on the inspection effort in these facility types.

Fishbone, L.G.; Sanborn, J.

1994-12-01T23:59:59.000Z

491

Estimating Emissions of Other Greenhouse Gases  

U.S. Energy Information Administration (EIA)

Estimating Emissions of Other Greenhouse Gases Presentation to the Department of Energy Republic of the Philippines September 17, 1997 Arthur Rypinski Energy ...

492

Improved diagnostic model for estimating wind energy  

DOE Green Energy (OSTI)

Because wind data are available only at scattered locations, a quantitative method is needed to estimate the wind resource at specific sites where wind energy generation may be economically feasible. This report describes a computer model that makes such estimates. The model uses standard weather reports and terrain heights in deriving wind estimates; the method of computation has been changed from what has been used previously. The performance of the current model is compared with that of the earlier version at three sites; estimates of wind energy at four new sites are also presented.

Endlich, R.M.; Lee, J.D.

1983-03-01T23:59:59.000Z

493

Estimate sequence methods: extensions and approximations  

E-Print Network (OSTI)

Aug 11, 2009 ... The approach of estimate sequence offers an interesting rereading of a ... a strategy for reducing the iteration cost by solving only coarsely ...

494

,"Pennsylvania Dry Natural Gas Reserves Estimated Production...  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Pennsylvania Dry Natural Gas Reserves Estimated Production (Billion Cubic Feet)",1,"Annual",2011 ,"Release...

495

,"Mississippi Dry Natural Gas Reserves Estimated Production ...  

U.S. Energy Information Administration (EIA) Indexed Site

Of Series","Frequency","Latest Data for" ,"Data 1","Mississippi Dry Natural Gas Reserves Estimated Production (Billion Cubic Feet)",1,"Annual",2011 ,"Release...

496

,"Dry Natural Gas Reserves Estimated Production "  

U.S. Energy Information Administration (EIA) Indexed Site

Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Dry Natural Gas Reserves Estimated Production ",52,"Annual",2011,"6301977" ,"Release Date:","81...

497

ORISE: Radiation Dose Estimates and Other Compendia  

NLE Websites -- All DOE Office Websites (Extended Search)

article addresses methods that can be used to rapidly estimate internal and external radiation dose magnitudes that can be used to help guide early medical management. Included...

498

Bandlet Image Estimation with Model Selection  

E-Print Network (OSTI)

A new estimator is introduced to reduce white noise added to images having a geometrical regularity. This estimator projects the observations on orthogonal bandlet vectors selected in a dictionary of orthonormal bases. It is proved that the resulting risk is quasi asymptotically minimax for geometrically regular images. This paper is also a tutorial on estimation with general dictionary of orthogonal bases, through model selection. It explains how to build a thresholding estimator in a adaptively chosen ``best'' basis and gives a simple proof of its performance with the model selection approach of Barron, Birge and Massart

Dossal, Charles; Mallat, Stéphane

2008-01-01T23:59:59.000Z

499

Estimating IPv6 & DNSSEC Deployment Status  

Science Conference Proceedings (OSTI)

Estimating IPv6 & DNSSEC External Service Deployment Status Background and Methodology. ... gov.two. Agency Two, (errors & islands). gov.three. ...

2013-11-07T23:59:59.000Z

500

Argonne Software Licensing: Battery Life Estimation Software  

Battery Life Estimation. Rising gasoline and diesel fuel prices have resulted in a resurgence of interest in hybrid electric and plug-in