  1. Cost Estimating Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Cost Estimating Guide by Ruben Sanchez Functional areas: Budget and Financial Management, Financial Management This Guide provides uniform guidance and best practices that...

  2. WPN 00-4- Estimated 25% State Cost Share Requirement for the Weatherization Assistance Program for Program Year 2001

    Broader source: Energy.gov [DOE]

    To provide estimated figures for the states to begin their planning for the enacted 25% cost share requirement for funding of the low-income Weatherization Assistance Program beginning with Program Year 2001.

  3. Required cavity HOM deQing calculated from probability estimates of coupled bunch instabilities in the APS ring

    SciTech Connect (OSTI)

    Emery, L.

    1993-06-01

    A method of determining the deQing requirement of individual cavity higher-order modes (HOM) for a multi-cavity RF system is presented and applied to the APS ring. Since HOM resonator frequency values are to some degree uncertain, the HOM frequencies should be regarded as random variables in predicting the stability of the coupled bunch beam modes. A Monte Carlo simulation provides a histogram of the growth rates from which one obtains an estimate of the probability of instability. The damping of each HOM type is determined such that the damping effort is economized, i.e. no single HOM dominates the specified growth rate histogram.

  4. Sample size requirements for estimating effective dose from computed tomography using solid-state metal-oxide-semiconductor field-effect transistor dosimetry

    SciTech Connect (OSTI)

    Trattner, Sigal; Cheng, Bin; Pieniazek, Radoslaw L.; Hoffmann, Udo; Douglas, Pamela S.; Einstein, Andrew J.

    2014-04-15

    Purpose: Effective dose (ED) is a widely used metric for comparing ionizing radiation burden between different imaging modalities, scanners, and scan protocols. In computed tomography (CT), ED can be estimated by performing scans on an anthropomorphic phantom in which metal-oxide-semiconductor field-effect transistor (MOSFET) solid-state dosimeters have been placed to enable organ dose measurements. Here a statistical framework is established to determine the sample size (number of scans) needed for estimating ED to a desired precision and confidence, for a particular scanner and scan protocol, subject to practical limitations. Methods: The statistical scheme involves solving equations which minimize the sample size required for estimating ED to desired precision and confidence. It is subject to a constrained variation of the estimated ED and solved using the Lagrange multiplier method. The scheme incorporates measurement variation introduced both by MOSFET calibration, and by variation in MOSFET readings between repeated CT scans. Sample size requirements are illustrated on cardiac, chest, and abdomen–pelvis CT scans performed on a 320-row scanner and chest CT performed on a 16-row scanner. Results: Sample sizes for estimating ED vary considerably between scanners and protocols. Sample size increases as the required precision or confidence is higher and also as the anticipated ED is lower. For example, for a helical chest protocol, for 95% confidence and 5% precision for the ED, 30 measurements are required on the 320-row scanner and 11 on the 16-row scanner when the anticipated ED is 4 mSv; these sample sizes are 5 and 2, respectively, when the anticipated ED is 10 mSv. Conclusions: Applying the suggested scheme, it was found that even at modest sample sizes, it is feasible to estimate ED with high precision and a high degree of confidence. As CT technology develops enabling ED to be lowered, more MOSFET measurements are needed to estimate ED with the same

  5. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  6. Types of Cost Estimates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

  7. Estimating Methods

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Based on the project's scope, the purpose of the estimate, and the availability of estimating resources, the estimator can choose one or a combination of techniques when estimating an activity or project. Estimating methods, estimating indirect and direct costs, and other estimating considerations are discussed in this chapter.

  8. Guidelines for Estimating Unmetered Landscapting Water Use

    SciTech Connect (OSTI)

    None

    2010-07-30

    Guidance to help Federal agencies estimate unmetered landscaping water use as required by Executive Order 13514

  9. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    SciTech Connect (OSTI)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  10. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    SciTech Connect (OSTI)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  11. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report

    SciTech Connect (OSTI)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  12. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  13. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... contracts for capital asset projects, decontamination & ... parametric estimates, and models, etc; and other ... by cost element, for the allocation pool and the allocation ...

  14. Animation Requirements

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  15. Examples of Cost Estimation Packages

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

  16. Eligibility Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligibility and required supporting documentation The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to enroll in the HDHP medical plan. Refer

  17. Competition Requirements

    Office of Environmental Management (EM)

    - Chapter 6.1 (January 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3.

  18. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  19. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  20. Deployment Requirements

    Broader source: Energy.gov (indexed) [DOE]

    Troy, Michigan June 13, 2014 THIS PRESENTATION DOES NOT CONTAIN ANY PROPRIETARY, CONFIDENTIAL OR OTHERWISE RESTRICTED INFORMATION 2 Outline of talk * SAE 2719 Requirements and ...

  1. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  2. Determining Allocation Requirements | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feedback Form Determining Allocation Requirements Estimating CPU-Hours for ALCF Blue GeneQ Systems When estimating CPU-hours for the ALCF Blue GeneQ systems, it is...

  3. Magnetic nanoparticle temperature estimation

    SciTech Connect (OSTI)

    Weaver, John B.; Rauwerdink, Adam M.; Hansen, Eric W.

    2009-05-15

    The authors present a method of measuring the temperature of magnetic nanoparticles that can be adapted to provide in vivo temperature maps. Many of the minimally invasive therapies that promise to reduce health care costs and improve patient outcomes heat tissue to very specific temperatures to be effective. Measurements are required because physiological cooling, primarily blood flow, makes the temperature difficult to predict a priori. The ratio of the fifth and third harmonics of the magnetization generated by magnetic nanoparticles in a sinusoidal field is used to generate a calibration curve and to subsequently estimate the temperature. The calibration curve is obtained by varying the amplitude of the sinusoidal field. The temperature can then be estimated from any subsequent measurement of the ratio. The accuracy was 0.3 deg. K between 20 and 50 deg. C using the current apparatus and half-second measurements. The method is independent of nanoparticle concentration and nanoparticle size distribution.

  4. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  5. gtp_flow_power_estimator.xlsx

    Broader source: Energy.gov [DOE]

    This simple spreadsheet model estimates either the flow rate required to produce a specified level of power output, or the power output that can be produced from a specified flow rate.

  6. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2

    SciTech Connect (OSTI)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.

    1994-09-01

    On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

  7. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  8. State Energy Production Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Production Estimates 1960 Through 2012 2012 Summary Tables Table P1. Energy Production Estimates in Physical Units, 2012 Alabama 19,455 215,710 9,525 0 Alaska 2,052 351,259...

  9. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  10. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  11. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  12. Network Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous...

  13. Requirements for Wind Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2015 Oklahoma amended the Oklahoma Wind Energy Development Act. The amendments added new financial security requirements, setback requirements, and notification requirements for wind energy...

  14. Reservoir Temperature Estimator

    Energy Science and Technology Software Center (OSTI)

    2014-12-08

    The Reservoir Temperature Estimator (RTEst) is a program that can be used to estimate deep geothermal reservoir temperature and chemical parameters such as CO2 fugacity based on the water chemistry of shallower, cooler reservoir fluids. This code uses the plugin features provided in The Geochemist’s Workbench (Bethke and Yeakel, 2011) and interfaces with the model-independent parameter estimation code Pest (Doherty, 2005) to provide for optimization of the estimated parameters based on the minimization of themore » weighted sum of squares of a set of saturation indexes from a user-provided mineral assemblage.« less

  15. Technology Requirements for In-Situ Decommissioning Workshop...

    Office of Environmental Management (EM)

    ... ISD-Specific performance models are required to estimate sustained performance and are the means to integrate the wide-range data set to validate andor adjust performance ...

  16. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

  17. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  18. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  19. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  20. Science Requirements Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  1. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  2. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  3. Derived Annual Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    74-1988 For Methodology Concerning the Derived Estimates Total Consumption of Offsite-Produced Energy for Heat and Power by Industry Group, 1974-1988 Total Energy *** Electricity...

  4. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  5. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The objective of this Guide is to improve the quality of cost estimates and further strengthen the DOE program/project management system. The original 25 separate chapters and three appendices have been combined to create a single document.

  6. Independent Cost Estimate (ICE)

    Broader source: Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  7. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Act (CAA) Requirements for air quality and air emissions from facility operations Clean Water Act (CWA) Requirements for water quality and water discharges from facility...

  8. Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Editors, "High Energy Physics and Nuclear Physics Network Requirements - Final Report", ESnet Network Requirements Workshop, August 2013, LBNL 6642E Download File: HEP-NP-Net-Req...

  9. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect (OSTI)

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  10. Forward estimation for game-tree search

    SciTech Connect (OSTI)

    Zhang, Weixiong

    1996-12-31

    It is known that bounds on the minimax values of nodes in a game tree can be used to reduce the computational complexity of minimax search for two-player games. We describe a very simple method to estimate bounds on the minimax values of interior nodes of a game tree, and use the bounds to improve minimax search. The new algorithm, called forward estimation, does not require additional domain knowledge other than a static node evaluation function, and has small constant overhead per node expansion. We also propose a variation of forward estimation, which provides a tradeoff between computational complexity and decision quality. Our experimental results show that forward estimation outperforms alpha-beta pruning on random game trees and the game of Othello.

  11. Lensed CMB simulation and parameter estimation

    SciTech Connect (OSTI)

    Lewis, Antony

    2005-04-15

    Modelling of the weak lensing of the CMB will be crucial to obtain correct cosmological parameter constraints from forthcoming precision CMB anisotropy observations. The lensing affects the power spectrum as well as inducing non-Gaussianities. We discuss the simulation of full-sky CMB maps in the weak lensing approximation and describe a fast numerical code. The series expansion in the deflection angle cannot be used to simulate accurate CMB maps, so a pixel remapping must be used. For parameter estimation accounting for the change in the power spectrum but assuming Gaussianity is sufficient to obtain accurate results up to Planck sensitivity using current tools. A fuller analysis may be required to obtain accurate error estimates and for more sensitive observations. We demonstrate a simple full-sky simulation and subsequent parameter estimation at Planck-like sensitivity. The lensed CMB simulation and parameter estimation codes are publicly available.

  12. Parametric Hazard Function Estimation.

    Energy Science and Technology Software Center (OSTI)

    1999-09-13

    Version 00 Phaze performs statistical inference calculations on a hazard function (also called a failure rate or intensity function) based on reported failure times of components that are repaired and restored to service. Three parametric models are allowed: the exponential, linear, and Weibull hazard models. The inference includes estimation (maximum likelihood estimators and confidence regions) of the parameters and of the hazard function itself, testing of hypotheses such as increasing failure rate, and checking ofmore » the model assumptions.« less

  13. REQUESTS FOR RETIREMENT ESTIMATE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REQUEST FOR RETIREMENT ANNUITY ESTIMATE Instructions: Please read and answer the following questions thoroughly to include checking all applicable boxes. Unanswered questions may delay processing. Print and Fax back your request form to 202.586.6395 or drop request to GM-169. The request will be assigned to your servicing retirement specialist. They will confirm receipt of your request. SECTION A Request Submitted _____________________ ______________________ ________________________

  14. Weekly Coal Production Estimation Methodology

    Gasoline and Diesel Fuel Update (EIA)

    Weekly Coal Production Estimation Methodology Step 1 (Estimate total amount of weekly U.S. coal production) U.S. coal production for the current week is estimated using a ratio ...

  15. Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Requirements Statutes 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air ...

  16. Requirements Management Database

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This application is a simplified and customized version of the RBA and CTS databases to capture federal, site, and facility requirements, link to actions that must be performed to maintain compliance with their contractual and other requirements.

  17. ARM - Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    StatisticsReporting Requirements 2016 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) Past Quarterly Reports Historical Statistics Field Campaigns Operational Visitors and Accounts Data Archive and Usage (October 1995 - Present) Reporting Requirements As a matter of government policy, all U.S. Department of Energy user facilities, including the ARM Climate Research Facility, have a number of reporting requirements. The Facility is required to

  18. PIT Coating Requirements Analysis

    SciTech Connect (OSTI)

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  19. RMACS software requirements specification

    SciTech Connect (OSTI)

    Gneiting, B.C.

    1996-10-01

    This document defines the essential user (or functional) requirements of the Requirements Management and Assured Compliance System (RMACS), which is used by the Tank Waste Remediation System program (TWRS). RMACS provides a computer-based environment that TWRS management and systems engineers can use to identify, define, and document requirements. The intent of the system is to manage information supporting definition of the TWRS technical baseline using a structured systems engineering process. RMACS has the capability to effectively manage a complete set of complex requirements and relationships in a manner that satisfactorily assures compliance to the program requirements over the TWRS life-cycle.

  20. Requirement-Reviews.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  1. State Energy Production Estimates

    Gasoline and Diesel Fuel Update (EIA)

    Production Estimates 1960 Through 2014 2014 Summary Tables U.S. Energy Information Administration | State Energy Data 2014: Production 1 Table P1. Energy Production Estimates in Physical Units, 2014 Alabama 16,377 181,054 9,828 0 Alaska 1,502 345,331 181,175 0 Arizona 8,051 106 56 1,044 Arkansas 94 1,123,678 6,845 0 California 0 252,718 204,269 4,462 Colorado 24,007 1,631,391 95,192 3,133 Connecticut 0 0 0 0 Delaware 0 0 0 0 District of Columbia 0 0 0 0 Florida 0 369 2,227 0 Georgia 0 0 0 2,517

  2. Other Requirements - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Requirements by Website Administrator More filters Less filters Other Policy Type Secretarial Memo Program Office Memo Invoked Technical Standards 100 Office of Primary Interest (OPI) Office of Primary Interest (OPI) All AD - Office of Administrative Services AU - Office of Environment, Health, Safety and Security CF - Office of the Chief Financial Officer CI - Office of Congressional and Intergovernmental Affairs CN - Office of Counterintelligence CP - Office of the Press Secretary CR -

  3. Use of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

  4. Guidelines for Estimating Unmetered Landscaping Water Use | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Landscaping Water Use Guidelines for Estimating Unmetered Landscaping Water Use Document describes the step-by-step instructions to estimate landscaping water using two alternative approaches: the evapotranspiration method and the irrigation audit method. This report presents annual irrigation factors for 36 cities across the United States that represent the gallons of irrigation required per square foot for distinct landscape types. Download the Guidelines for Estimating Unmetered

  5. Battery Calendar Life Estimator Manual Modeling and Simulation

    SciTech Connect (OSTI)

    Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

    2012-10-01

    The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

  6. Battery Life Estimator Manual Linear Modeling and Simulation

    SciTech Connect (OSTI)

    Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

    2009-08-01

    The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

  7. Cost estimate guidelines for advanced nuclear power technologies

    SciTech Connect (OSTI)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs.

  8. BES Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  9. ESnet Requirements Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Workshops Summary for Sites Eli Dart, Network Engineer ESnet Network Engineering Group ESnet Site Coordinating Committee Meeting Clemson, SC February 2, 2011 Lawrence ...

  10. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  11. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  12. Unreviewed Safety Question Requirements

    Office of Environmental Management (EM)

    DOE G 424.1-1, Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements Performance Objective 1: Contractor Program Documentation 1. The USQ ...

  13. Transuranic Waste Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  14. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  15. Residential Solar Permit Requirements

    Broader source: Energy.gov [DOE]

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  16. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Portability and Accountability Act of 1996 (HIPAA) imposes numerous requirements on employer health plans concerning the use and disclosure of individual health information. ...

  17. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  18. Automated Estimating System

    Energy Science and Technology Software Center (OSTI)

    1996-04-15

    AES6.1 is a PC software package developed to aid in the preparation and reporting of cost estimates. AES6.1 provides an easy means for entering and updating the detailed cost, schedule information, project work breakdown structure, and escalation information contained in a typical project cost estimate through the use of menus and formatted input screens. AES6.1 combines this information to calculate both unescalated and escalated cost for a project which can be reported at varying levelsmore » of detail. Following are the major modifications to AES6.0f: Contingency update was modified to provide greater flexibility for user updates, Schedule Update was modified to provide user ability to schedule Bills of Material at the WBS/Participant/Cost Code level, Schedule Plot was modified to graphically show schedule by WBS/Participant/Cost Code, All Fiscal Year reporting has been modified to use the new schedule format, The Schedule 1-B-7, Cost Schedule, and the WBS/Participant reprorts were modified to determine Phase of Work from the B/M Cost Code, Utility program was modified to allow selection by cost code and update cost code in the Global Schedule update, Generic summary and line item download were added to the utility program, and an option was added to all reports which allows the user to indicate where overhead is to be reported (bottom line or in body of report)« less

  19. Integrated Management Requirements mapping

    SciTech Connect (OSTI)

    Holmes, J.T.; Andrews, N.S.

    1992-06-01

    This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

  20. Integrated Management Requirements mapping

    SciTech Connect (OSTI)

    Holmes, J.T.; Andrews, N.S.

    1992-06-01

    This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

  1. General Responsibilities and Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  2. Writing testable software requirements

    SciTech Connect (OSTI)

    Knirk, D.

    1997-11-01

    This tutorial identifies common problems in analyzing requirements in the problem and constructing a written specification of what the software is to do. It deals with two main problem areas: identifying and describing problem requirements, and analyzing and describing behavior specifications.

  3. Guidelines for Estimating Unmetered Landscaping Water Use

    SciTech Connect (OSTI)

    McMordie Stoughton, Kate

    2010-07-28

    The document lays-out step by step instructions to estimate landscaping water using two alternative approaches: evapotranspiration method and irrigation audit method. The evapotranspiration method option calculates the amount of water needed to maintain a healthy turf or landscaped area for a given location based on the amount of water transpired and evaporated from the plants. The evapotranspiration method offers a relatively easy “one-stop-shop” for Federal agencies to develop an initial estimate of annual landscape water use. The document presents annual irrigation factors for 36 cities across the U.S. that represents the gallons of irrigation required per square foot for distinct landscape types. By following the steps outlined in the document, the reader can choose a location that is a close match their location and landscape type to provide a rough estimate of annual irrigation needs without the need to research specific data on their site. The second option presented in the document is the irrigation audit method, which is the physical measurement of water applied to landscaped areas through irrigation equipment. Steps to perform an irrigation audit are outlined in the document, which follow the Recommended Audit Guidelines produced by the Irrigation Association.[5] An irrigation audit requires some knowledge on the specific procedures to accurately estimate how much water is being consumed by the irrigation equipment.

  4. Robust Optical Richness Estimation with Reduced Scatter

    SciTech Connect (OSTI)

    Rykoff, E.S.; Koester, B.P.; Rozo, E.; Annis, J.; Evrard, A.E.; Hansen, S.M.; Hao, J.; Johnston, D.E.; McKay, T.A.; Wechsler, R.H.; /KIPAC, Menlo Park /SLAC

    2012-06-07

    Reducing the scatter between cluster mass and optical richness is a key goal for cluster cosmology from photometric catalogs. We consider various modifications to the red-sequence matched filter richness estimator of Rozo et al. (2009b), and evaluate their impact on the scatter in X-ray luminosity at fixed richness. Most significantly, we find that deeper luminosity cuts can reduce the recovered scatter, finding that {sigma}{sub ln L{sub X}|{lambda}} = 0.63 {+-} 0.02 for clusters with M{sub 500c} {approx}> 1.6 x 10{sup 14} h{sub 70}{sup -1} M{sub {circle_dot}}. The corresponding scatter in mass at fixed richness is {sigma}{sub ln M|{lambda}} {approx} 0.2-0.3 depending on the richness, comparable to that for total X-ray luminosity. We find that including blue galaxies in the richness estimate increases the scatter, as does weighting galaxies by their optical luminosity. We further demonstrate that our richness estimator is very robust. Specifically, the filter employed when estimating richness can be calibrated directly from the data, without requiring a-priori calibrations of the red-sequence. We also demonstrate that the recovered richness is robust to up to 50% uncertainties in the galaxy background, as well as to the choice of photometric filter employed, so long as the filters span the 4000 {angstrom} break of red-sequence galaxies. Consequently, our richness estimator can be used to compare richness estimates of different clusters, even if they do not share the same photometric data. Appendix A includes 'easy-bake' instructions for implementing our optimal richness estimator, and we are releasing an implementation of the code that works with SDSS data, as well as an augmented maxBCG catalog with the {lambda} richness measured for each cluster.

  5. Hanford ETR- Tank Waste Treatment and Immobilization Plant- Hanford Tank Waste Treatment and Immobilization Plant Technical Review- Estimate at Completion (Cost) Report

    Broader source: Energy.gov [DOE]

    This is a comprehensive review of the Hanford WTP estimate at completion - assessing the project scope, contract requirements, management execution plant, schedule, cost estimates, and risks.

  6. Promulgating Nuclear Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-05-15

    Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

  7. Green Building Requirement

    Office of Energy Efficiency and Renewable Energy (EERE)

    The new standards are phased in over the course of several years with publicly-owned buildings being the first required to comply. All new construction and substantial improvements of non...

  8. Requirements for security signalling

    SciTech Connect (OSTI)

    Pierson, L.G.; Tarman, T.D.

    1995-02-05

    There has been some interest lately in the need for ``authenticated signalling``, and the development of signalling specifications by the ATM Forum that support this need. The purpose of this contribution is to show that if authenticated signalling is required, then supporting signalling facilities for directory services (i.e. key management) are also required. Furthermore, this contribution identifies other security related mechanisms that may also benefit from ATM-level signalling accommodations. For each of these mechanisms outlined here, an overview of the signalling issues and a rough cut at the required fields for supporting Information Elements are provided. Finally, since each of these security mechanisms are specified by a number of different standards, issues pertaining to the selection of a particular security mechanism at connection setup time (i.e. specification of a required ``Security Quality of Service``) are also discussed.

  9. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an...

  10. Selected Guidance & Requirements

    Broader source: Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  11. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental

  12. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  13. CONTAMINATED SOIL VOLUME ESTIMATE TRACKING METHODOLOGY

    SciTech Connect (OSTI)

    Durham, L.A.; Johnson, R.L.; Rieman, C.; Kenna, T.; Pilon, R.

    2003-02-27

    The U.S. Army Corps of Engineers (USACE) is conducting a cleanup of radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The largest cost element for most of the FUSRAP sites is the transportation and disposal of contaminated soil. Project managers and engineers need an estimate of the volume of contaminated soil to determine project costs and schedule. Once excavation activities begin and additional remedial action data are collected, the actual quantity of contaminated soil often deviates from the original estimate, resulting in cost and schedule impacts to the project. The project costs and schedule need to be frequently updated by tracking the actual quantities of excavated soil and contaminated soil remaining during the life of a remedial action project. A soil volume estimate tracking methodology was developed to provide a mechanism for project managers and engineers to create better project controls of costs and schedule. For the FUSRAP Linde site, an estimate of the initial volume of in situ soil above the specified cleanup guidelines was calculated on the basis of discrete soil sample data and other relevant data using indicator geostatistical techniques combined with Bayesian analysis. During the remedial action, updated volume estimates of remaining in situ soils requiring excavation were calculated on a periodic basis. In addition to taking into account the volume of soil that had been excavated, the updated volume estimates incorporated both new gamma walkover surveys and discrete sample data collected as part of the remedial action. A civil survey company provided periodic estimates of actual in situ excavated soil volumes. By using the results from the civil survey of actual in situ volumes excavated and the updated estimate of the remaining volume of contaminated soil requiring excavation, the USACE Buffalo District was able to forecast and update project costs and schedule. The soil volume

  14. Cost Estimating, Analysis, and Standardization

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1984-11-02

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  15. Sub-Second Parallel State Estimation

    SciTech Connect (OSTI)

    Chen, Yousu; Rice, Mark J.; Glaesemann, Kurt R.; Wang, Shaobu; Huang, Zhenyu

    2014-10-31

    This report describes the performance of Pacific Northwest National Laboratory (PNNL) sub-second parallel state estimation (PSE) tool using the utility data from the Bonneville Power Administrative (BPA) and discusses the benefits of the fast computational speed for power system applications. The test data were provided by BPA. They are two-days’ worth of hourly snapshots that include power system data and measurement sets in a commercial tool format. These data are extracted out from the commercial tool box and fed into the PSE tool. With the help of advanced solvers, the PSE tool is able to solve each BPA hourly state estimation problem within one second, which is more than 10 times faster than today’s commercial tool. This improved computational performance can help increase the reliability value of state estimation in many aspects: (1) the shorter the time required for execution of state estimation, the more time remains for operators to take appropriate actions, and/or to apply automatic or manual corrective control actions. This increases the chances of arresting or mitigating the impact of cascading failures; (2) the SE can be executed multiple times within time allowance. Therefore, the robustness of SE can be enhanced by repeating the execution of the SE with adaptive adjustments, including removing bad data and/or adjusting different initial conditions to compute a better estimate within the same time as a traditional state estimator’s single estimate. There are other benefits with the sub-second SE, such as that the PSE results can potentially be used in local and/or wide-area automatic corrective control actions that are currently dependent on raw measurements to minimize the impact of bad measurements, and provides opportunities to enhance the power grid reliability and efficiency. PSE also can enable other advanced tools that rely on SE outputs and could be used to further improve operators’ actions and automated controls to mitigate effects

  16. NP Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  17. Requirements | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Requirements Students must earn a total of 11 points from the following options: Please note: To receive points toward the certificate, student are required to submit...

  18. Data Crosscutting Requirements Review

    SciTech Connect (OSTI)

    Kleese van Dam, Kerstin; Shoshani, Arie; Plata, Charity

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  19. Requirements for Xenon International

    SciTech Connect (OSTI)

    Hayes, James C.; Ely, James H.

    2013-09-26

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  20. Contractor Legal Management Requirements

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  1. Requirements for Xenon International

    SciTech Connect (OSTI)

    Hayes, James C.; Ely, James H.; Haas, Derek A.; Harper, Warren W.; Heimbigner, Tom R.; Hubbard, Charles W.; Humble, Paul H.; Madison, Jill C.; Morris, Scott J.; Panisko, Mark E.; Ripplinger, Mike D.; Stewart, Timothy L.

    2015-12-30

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  2. Managing routine bioassay requirements

    SciTech Connect (OSTI)

    Baumann, B.L., Westinghouse Hanford, Richland, WA

    1997-10-08

    The Hanford Site is a very diverse Department of Energy (DOE) Nuclear Site in Eastern Washington State that includes: retired reactor facilities, spent fuel storage facilities, chemical separations facilities, laboratories, and plutonium separations facilities. As a result worker routine bioassays requirements may include routine whole body counting for mixed fission products, chest counting for uranium or plutonium, and/or urinalyses for plutonium, ura@u@ strontium-90, and tritium depending on work assignments. In such a situation it is easy to perform unnecessary bioassays and incur unnecessary cost. Program Implementation Fluor Daniel Hanford has been working with the Pacific Northwest National. Laboratories to reduce the number of routine bioassays in the internal dosimetry program while ensuring the program is compliant with regulatory requirements. This has been accomplished by: 1. Clearly identifying what work requires routine bioassay 2. Clearly identifying what routine bioassay is required 3. Having a system in place to make sure personnel who need routine bioassay get it and 4. Taking measures to ensure that workers who doiVt need routine bioassay don`t get it.

  3. Requirements Definition Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

  4. Software Requirements Specification Verifiable Fuel Cycle Simulation (VISION) Model

    SciTech Connect (OSTI)

    D. E. Shropshire; W. H. West

    2005-11-01

    The purpose of this Software Requirements Specification (SRS) is to define the top-level requirements for a Verifiable Fuel Cycle Simulation Model (VISION) of the Advanced Fuel Cycle (AFC). This simulation model is intended to serve a broad systems analysis and study tool applicable to work conducted as part of the AFCI (including costs estimates) and Generation IV reactor development studies.

  5. Budget estimates. Fiscal year 1998

    SciTech Connect (OSTI)

    1997-02-01

    The U.S. Congress has determined that the safe use of nuclear materials for peaceful purposes is a legitimate and important national goal. It has entrusted the Nuclear Regulatory Commission (NRC) with the primary Federal responsibility for achieving that goal. The NRC`s mission, therefore, is to regulate the Nation`s civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. The NRC`s FY 1998 budget requests new budget authority of $481,300,000 to be funded by two appropriations - one is the NRC`s Salaraies and Expenses appropriation for $476,500,000, and the other is NRC`s Office of Inspector General appropriation for $4,800,000. Of the funds appropriated to the NRC`s Salaries and Expenses, $17,000,000, shall be derived from the Nuclear Waste Fund and $2,000,000 shall be derived from general funds. The proposed FY 1998 appropriation legislation would also exempt the $2,000,000 for regulatory reviews and other assistance provided to the Department of Energy from the requirement that the NRC collect 100 percent of its budget from fees. The sums appropriated to the NRC`s Salaries and Expenses and NRC`s Office of Inspector General shall be reduced by the amount of revenues received during FY 1998 from licensing fees, inspection services, and other services and collections, so as to result in a final FY 1998 appropriation for the NRC of an estimated $19,000,000 - the amount appropriated from the Nuclear Waste Fund and from general funds. Revenues derived from enforcement actions shall be deposited to miscellaneous receipts of the Treasury.

  6. Time and Resource Estimation Tool

    Energy Science and Technology Software Center (OSTI)

    2004-06-08

    RESTORE is a computer software tool that allows one to model a complex set of steps required to accomplish a goal (e.g., repair a ruptured natural gas pipeline and restore service to customers). However, the time necessary to complete step may be uncertain and may be affected by conditions, such as the weather, the time of day, the day of the week. Therefore, "nature" can influence which steps are taken and the time needed tomore » complete each step. In addition, the tool allows one to model the costs for each step, which also may be uncertain. RESTORE allows the user to estimate the time and cost, both of which may be uncertain, to achieve an intermediate stage of completion, as well as overall completion. The software also makes it possible to model parallel, competing groups of activities (i.e., parallel paths) so that progreSs at a ‘merge point’ can proceed before other competing activities are completed. For example, RESTORE permits one to model a workaround and a simultaneous complete repair to determine a probability distribution for the earliest time service can be restored to a critical customer. The tool identifies the ‘most active path’ through the network of tasks, which is extremely important information for assessing the most effective way to speed-up or slow-down progress. Unlike other project planning and risk analysis tools, RESTORE provides an intuitive, graphical, and object-oriented environment for structuring a model and setting its parameters.« less

  7. Robust and intelligent bearing estimation

    DOE Patents [OSTI]

    Claassen, John P.

    2000-01-01

    A method of bearing estimation comprising quadrature digital filtering of event observations, constructing a plurality of observation matrices each centered on a time-frequency interval, determining for each observation matrix a parameter such as degree of polarization, linearity of particle motion, degree of dyadicy, or signal-to-noise ratio, choosing observation matrices most likely to produce a set of best available bearing estimates, and estimating a bearing for each observation matrix of the chosen set.

  8. Supercooled liquid water Estimation Tool

    Energy Science and Technology Software Center (OSTI)

    2012-05-04

    The Cloud Supercooled liquid water Estimation Tool (SEET) is a user driven Graphical User Interface (GUI) that estimates cloud supercooled liquid water (SLW) content in terms of vertical column and total mass from Moderate resolution Imaging Supercooled liquid water Estimation Tool Spectroradiometer (MODIS) spatially derived cloud products and realistic vertical cloud parameterizations that are user defined. It also contains functions for post-processing of the resulting data in tabular and graphical form.

  9. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  10. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  11. LASSO* - Science Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LASSO* - Science Requirements *LES ARM Symbiotic Simulation and Observation (LASSO) workflow Andy Vogelmann 1 , William I Gustafson Jr 2 Zhijin Li 3,4 , Xiaoping Cheng 3 , Satoshi Endo 1 , Tami Toto 1 , and Heng Xiao 2 1 Brookhaven National Laboratory 2 Pacific Northwest National Laboratory 3 University of California Los Angeles 4 NASA Jet Propulsion Laboratory And TONS of people from the rest of ARM! LASSO Webpage: http://www.arm.gov/science/themes/lasso LASSO e-mail list sign up:

  12. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  13. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  14. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  15. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the

  16. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  17. LEGACY MANAGEMENT REQUIRES INFORMATION

    SciTech Connect (OSTI)

    CONNELL, C.W.; HILDEBRAND, R.D.

    2006-12-14

    ''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

  18. BER Science Network Requirements

    SciTech Connect (OSTI)

    Alapaty, Kiran; Allen, Ben; Bell, Greg; Benton, David; Brettin, Tom; Canon, Shane; Dart, Eli; Cotter, Steve; Crivelli, Silvia; Carlson, Rich; Dattoria, Vince; Desai, Narayan; Egan, Richard; Tierney, Brian; Goodwin, Ken; Gregurick, Susan; Hicks, Susan; Johnston, Bill; de Jong, Bert; Kleese van Dam, Kerstin; Livny, Miron; Markowitz, Victor; McGraw, Jim; McCord, Raymond; Oehmen, Chris; Regimbal, Kevin; Shipman, Galen; Strand, Gary; Flick, Jeff; Turnbull, Susan; Williams, Dean; Zurawski, Jason

    2010-11-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

  19. STOCHASTIC COOLING POWER REQUIREMENTS.

    SciTech Connect (OSTI)

    WEI,J.BLASKIEWICZ,M.BRENNAN,M.

    2004-07-05

    A practical obstacle for stochastic cooling in high-energy colliders like RHIC is the large amount of power needed for the cooling system. Based on the coasting-beam Fokker-Planck (F-P) equation, we analytically derived the optimum cooling rate and cooling power for a beam of uniform distribution and a cooling system of linear gain function. The results indicate that the usual back-of-envelope formula over-estimated the cooling power by a factor of the mixing factor M. On the other hand, the scaling laws derived from the coasting-beam Fokker-Planck approach agree with those derived from the bunched-beam Fokker-Planck approach if the peak beam intensity is used as the effective coasting-beam intensity. A longitudinal stochastic cooling system of 4-8 GHz bandwidth in RHIC can effectively counteract intrabeam scattering, preventing the beam from escaping the RF bucket becoming debunched around the ring.

  20. Energy requirements of the switchable polarity solvent forward osmosis

    Office of Scientific and Technical Information (OSTI)

    (SPS-FO) water purification process (Journal Article) | SciTech Connect Journal Article: Energy requirements of the switchable polarity solvent forward osmosis (SPS-FO) water purification process Citation Details In-Document Search Title: Energy requirements of the switchable polarity solvent forward osmosis (SPS-FO) water purification process A model was developed to estimate the process energy requirements of a switchable polarity solvent forward osmosis (SPS FO) system for water

  1. Derived Annual Estimates of Manufacturing Energy Consumption...

    U.S. Energy Information Administration (EIA) Indexed Site

    > Derived Annual Estimates - Executive Summary Derived Annual Estimates of Manufacturing Energy Consumption, 1974-1988 Figure showing Derived Estimates Executive Summary This...

  2. BES Science Network Requirements

    SciTech Connect (OSTI)

    Biocca, Alan; Carlson, Rich; Chen, Jackie; Cotter, Steve; Tierney, Brian; Dattoria, Vince; Davenport, Jim; Gaenko, Alexander; Kent, Paul; Lamm, Monica; Miller, Stephen; Mundy, Chris; Ndousse, Thomas; Pederson, Mark; Perazzo, Amedeo; Popescu, Razvan; Rouson, Damian; Sekine, Yukiko; Sumpter, Bobby; Dart, Eli; Wang, Cai-Zhuang -Z; Whitelam, Steve; Zurawski, Jason

    2011-02-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

  3. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Token Requesting A Token RSA_SecurID_SID800.jpg Step One - Registering with the DOE's Management Information System (MIS) Before you request a DOE Digital Identity, you must register in DOE's Management Information System (MIS). Please note that DOE Federal employees are already registered and do not need to complete this step. They may skip to step two. During the registration process, you will be required to select a DOE sponsor. Your sponsor is the DOE employee who certifies that you have a

  4. Module: Estimating Historical Emissions from Deforestation |...

    Open Energy Info (EERE)

    Website: www.leafasia.orgtoolstechnical-guidance-series-estimating-historical Cost: Free Language: English Module: Estimating Historical Emissions from Deforestation Screenshot...

  5. Development of surface mine cost estimating equations

    SciTech Connect (OSTI)

    Not Available

    1980-09-26

    Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

  6. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  7. communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements NBP RFI: Communications Requirements- Comments of Lake Region Electric Cooperative- Minnesota

  8. Estimate Radiological Dose for Animals

    Energy Science and Technology Software Center (OSTI)

    1997-12-18

    Estimate Radiological dose for animals in ecological environment using open literature values for parameters such as body weight, plant and soil ingestion rate, rad. halflife, absorbed energy, biological halflife, gamma energy per decay, soil-to-plant transfer factor, ...etc

  9. Estimates of Green potentials. Applications

    SciTech Connect (OSTI)

    Danchenko, V I

    2003-02-28

    Optimal Cartan-type covers by hyperbolic discs of carriers of Green {alpha}-potentials are obtained in a simply connected domain in the complex plane and estimates of the potentials outside the carriers are presented. These results are applied to problems on the separation of singularities of analytic and harmonic functions. For instance, uniform and integral estimates in terms of Green capacities of components of meromorphic functions are obtained.

  10. ASCR Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Tierney, Brian

    2009-08-24

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high

  11. Revenue Requirements Model (RRM) documentation. Final report (Revised)

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The Revenue Requirements Model (RRM) is designed to estimate the impact of various regulatory and economic policy variables on the total revenue requirements of electric utilities. The RRM is built to utilize financial data extracted from the Standard and Poor's (S and P) Compustat II Utility data base (a proprietary data base). The RRM uses a simplified regulatory accounting framework to estimate the cost of service of the electric operations of utilities. The RRM is written in SAS, a proprietary software system. The RRM produces a series of reports including a summary of key data utilized therein, an income statement, revenue requirements, and selected key financial measures. Each report includes estimates for a base case and a hypothetical case. 4 figures, 6 tables.

  12. BGE Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BGE Communications Requirements BGE Communications Requirements Chart of BGE Communications Requirements PDF icon BGE Communications Requirements More Documents & Publications ...

  13. Weldon Spring historical dose estimate

    SciTech Connect (OSTI)

    Meshkov, N.; Benioff, P.; Wang, J.; Yuan, Y.

    1986-07-01

    This study was conducted to determine the estimated radiation doses that individuals in five nearby population groups and the general population in the surrounding area may have received as a consequence of activities at a uranium processing plant in Weldon Spring, Missouri. The study is retrospective and encompasses plant operations (1957-1966), cleanup (1967-1969), and maintenance (1969-1982). The dose estimates for members of the nearby population groups are as follows. Of the three periods considered, the largest doses to the general population in the surrounding area would have occurred during the plant operations period (1957-1966). Dose estimates for the cleanup (1967-1969) and maintenance (1969-1982) periods are negligible in comparison. Based on the monitoring data, if there was a person residing continually in a dwelling 1.2 km (0.75 mi) north of the plant, this person is estimated to have received an average of about 96 mrem/yr (ranging from 50 to 160 mrem/yr) above background during plant operations, whereas the dose to a nearby resident during later years is estimated to have been about 0.4 mrem/yr during cleanup and about 0.2 mrem/yr during the maintenance period. These values may be compared with the background dose in Missouri of 120 mrem/yr.

  14. Preliminary relative permeability estimates of methanehydrate-bearing sand

    SciTech Connect (OSTI)

    Seol, Yongkoo; Kneafsey, Timothy J.; Tomutsa, Liviu; Moridis,George J.

    2006-05-08

    The relative permeability to fluids in hydrate-bearing sediments is an important parameter for predicting natural gas production from gas hydrate reservoirs. We estimated the relative permeability parameters (van Genuchten alpha and m) in a hydrate-bearing sand by means of inverse modeling, which involved matching water saturation predictions with observations from a controlled waterflood experiment. We used x-ray computed tomography (CT) scanning to determine both the porosity and the hydrate and aqueous phase saturation distributions in the samples. X-ray CT images showed that hydrate and aqueous phase saturations are non-uniform, and that water flow focuses in regions of lower hydrate saturation. The relative permeability parameters were estimated at two locations in each sample. Differences between the estimated parameter sets at the two locations were attributed to heterogeneity in the hydrate saturation. Better estimates of the relative permeability parameters require further refinement of the experimental design, and better description of heterogeneity in the numerical inversions.

  15. Quick estimating for thermal conductivity

    SciTech Connect (OSTI)

    Sastri, S.R.S.; Rao, K.K. )

    1993-08-01

    Accurate values for thermal conductivity--an important engineering property used in heat transfer calculations of liquids--are not as readily available as those for other physical properties. Therefore, it often becomes necessary to use estimated data. A new estimating method combines ease of use with an accuracy that is generally better than existing procedures. The paper discusses how to select terms and testing correlations, then gives two examples of the use of the method for calculation of the thermal conductivity of propionic acid and chlorobenzene.

  16. Transportation Infrastructure Requirement Resources | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Find infrastructure requirement resources below. DOE Resource Alternative Fuels Data Center: Natural Gas Fueling Infrastructure Development. Other Resource National Governors ...

  17. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  18. Considering Project Requirements and Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Considering the requirements and recommendations of the project is the fourth step in planning for a federal site solar installation.

  19. Mandatory Photovoltaic System Cost Estimate

    Broader source: Energy.gov [DOE]

    If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, the utility must provide the comparison at no cost. If the...

  20. BLE: Battery Life Estimator | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BLE: Battery Life Estimator BLE: Battery Life Estimator Argonne's Battery Life Estimator (BLE) software is a state-of-the-art tool kit for fitting battery aging data and for ...

  1. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    SciTech Connect (OSTI)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook.

  2. Estimating Waste Inventory and Waste Tank Characterization |...

    Office of Environmental Management (EM)

    Estimating Waste Inventory and Waste Tank Characterization Estimating Waste Inventory and Waste Tank Characterization Summary Notes from 28 May 2008 Generic Technical Issue ...

  3. Estimates and Recommendations for Coincidence Geometry (Technical...

    Office of Scientific and Technical Information (OSTI)

    Estimates and Recommendations for Coincidence Geometry Citation Details In-Document Search Title: Estimates and Recommendations for Coincidence Geometry You are accessing a...

  4. Background estimation in experimental spectra

    SciTech Connect (OSTI)

    Fischer, R.; Hanson, K. M.; Los Alamos National Laboratory, MS P940, Los Alamos, New Mexico 87545 ; Dose, V.; Linden, W. von der

    2000-02-01

    A general probabilistic technique for estimating background contributions to measured spectra is presented. A Bayesian model is used to capture the defining characteristics of the problem, namely, that the background is smoother than the signal. The signal is allowed to have positive and/or negative components. The background is represented in terms of a cubic spline basis. A variable degree of smoothness of the background is attained by allowing the number of knots and the knot positions to be adaptively chosen on the basis of the data. The fully Bayesian approach taken provides a natural way to handle knot adaptivity and allows uncertainties in the background to be estimated. Our technique is demonstrated on a particle induced x-ray emission spectrum from a geological sample and an Auger spectrum from iron, which contains signals with both positive and negative components. (c) 2000 The American Physical Society.

  5. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  6. Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regular participation in a student green group may also earn credit. Create a PARC Education & Outreach Video Earn 2 points Work with PARC Multimedia Specialist Dan Allen ...

  7. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  8. Benefits Forms & Required Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits Forms & Required Notices Benefits Forms & Required Notices A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contacts Benefits Office (505) 667-1806 Email Benefits Forms & Required Notices Forms Benefits Enrollment Form, 1751a (pdf) Declaration of Domestic Partnership, 1925a (pdf) Declaration of Legal Ward as Eligible Dependent, 3028 (pdf) Declaration that Enrolled Dependent Meets IRS

  9. Future missions require improving LANSCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future missions require improving LANSCE capabilities to support five principal research ... Science Critical to DOE and NNSA Missions for Over 35 Years Hydrodynamics with Proton ...

  10. Travel Requirements - ITER (June 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Travel Requirements - ITER (June 2014) Prior to any travel under this subcontract, the ... approval, with a copy to the identified US ITER Project Office Travel Administrative ...

  11. Federal Requirements for the Web

    Broader source: Energy.gov [DOE]

    Federal laws and requirements govern the Office of Energy Efficiency and Renewable Energy (EERE) with regards to its websites and other digital media.

  12. Animation Requirements for the Web

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow the Office of Energy Efficiency and Renewable Energy's (EERE's) design and coding requirements.

  13. Data Collection and Normalization for the Development of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost estimating relationships or parametric equations are mathematical statements that indicate that the cost is proportional to a physical commodity. Parametric estimating requires that the statistical analysis be performed on data points to correlate the cost drivers and other system parameters. This chapter discusses considerations for data collection and normalization.

  14. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  15. Feedback techniques and SPS Ecloud instabilities - design estimates

    SciTech Connect (OSTI)

    Fox,J.D.; Mastorides, T.; Ndabashimiye, G.; Rivetta, C.; Van Winkle, D.; Byrd, J.; Vay, J-L.; Hofle, W.; Rumolo, G.; de Maria, R.

    2009-05-04

    The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. While the SPS has a coupled-bunch transverse feedback system, control of Ecloud driven motion requires a much wider control bandwidth capable of sensing and controlling motion within each bunched beam. This paper draws beam dynamics data from the measurements and simulations of this SPS instability, and estimates system requirements for a feedback system with 2-4 GS/sec. sampling rates to damp Ecloud-driven transverse motion in the SPS at intensities desired for high-current LHC operation.

  16. Automotive Turbocharging: Industrial Requirements and Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbocharging: Industrial Requirements and Technology Developments Automotive Turbocharging: Industrial Requirements and Technology Developments Significant improvements in ...

  17. Chart of communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chart of communications requirements Chart of communications requirements Chart of communications requirements for BGE Chart of communications requirements (109.11 KB) More Documents & Publications BGE Communications Requirements Lower Colorado River Authority Lower Colorado River Authority

  18. Program Evaluation: Minimum EERE Requirements

    Broader source: Energy.gov [DOE]

    The minimum requirements for EERE's in-progress peer reviews are described below. Given the diversity of EERE programs and activities, a great deal of flexibility is provided within these...

  19. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  20. 4.5 Audit Requirements

    Broader source: Energy.gov (indexed) [DOE]

    ... The named person will be required to have a password and user ID for the secured portion of Clearinghouse database. Passwords and user IDs should be coordinated through the Office ...

  1. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site map An overview of the available content on this site. Keep the pointer still over an item for a few seconds to get its description. Directives Delegations Other Requirements Top 10 Directives Help Directives Tools RevCom

  2. Video Requirements for the Web

    Office of Energy Efficiency and Renewable Energy (EERE)

    All Office of Energy Efficiency and Renewable Energy (EERE) videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the U.S. Department of Energy YouTube channel.

  3. 2007 Estimated International Energy Flows

    SciTech Connect (OSTI)

    Smith, C A; Belles, R D; Simon, A J

    2011-03-10

    An energy flow chart or 'atlas' for 136 countries has been constructed from data maintained by the International Energy Agency (IEA) and estimates of energy use patterns for the year 2007. Approximately 490 exajoules (460 quadrillion BTU) of primary energy are used in aggregate by these countries each year. While the basic structure of the energy system is consistent from country to country, patterns of resource use and consumption vary. Energy can be visualized as it flows from resources (i.e. coal, petroleum, natural gas) through transformations such as electricity generation to end uses (i.e. residential, commercial, industrial, transportation). These flow patterns are visualized in this atlas of 136 country-level energy flow charts.

  4. Bayesian estimation methods in metrology

    SciTech Connect (OSTI)

    Cox, M.G.; Forbes, A.B.; Harris, P.M.

    2004-11-16

    In metrology -- the science of measurement -- a measurement result must be accompanied by a statement of its associated uncertainty. The degree of validity of a measurement result is determined by the validity of the uncertainty statement. In recognition of the importance of uncertainty evaluation, the International Standardization Organization in 1995 published the Guide to the Expression of Uncertainty in Measurement and the Guide has been widely adopted. The validity of uncertainty statements is tested in interlaboratory comparisons in which an artefact is measured by a number of laboratories and their measurement results compared. Since the introduction of the Mutual Recognition Arrangement, key comparisons are being undertaken to determine the degree of equivalence of laboratories for particular measurement tasks. In this paper, we discuss the possible development of the Guide to reflect Bayesian approaches and the evaluation of key comparison data using Bayesian estimation methods.

  5. Actions taken by DOD on GAO recommendations to improve spare parts requirements determination

    SciTech Connect (OSTI)

    Not Available

    1985-04-30

    GAO found that actions taken by the military services and DOD to improve the spare parts requirements determination process, in response to prior GAO report recommendations, have resulted in estimated cost savings of over $800 million during the past 5 years. Additional actions in process should result in further estimated savings of over $500 million.

  6. Functional performance requirements for seismic network upgrade

    SciTech Connect (OSTI)

    Lee, R.C.

    1991-08-18

    The SRL seismic network, established in 1976, was developed to monitor site and regional seismic activity that may have any potential to impact the safety or reduce containment capability of existing and planned structures and systems at the SRS, report seismic activity that may be relevant to emergency preparedness, including rapid assessments of earthquake location and magnitude, and estimates of potential on-site and off-site damage to facilities and lifelines for mitigation measures. All of these tasks require SRL seismologists to provide rapid analysis of large amounts of seismic data. The current seismic network upgrade, the subject of this Functional Performance Requirements Document, is necessary to improve system reliability and resolution. The upgrade provides equipment for the analysis of the network seismic data and replacement of old out-dated equipment. The digital network upgrade is configured for field station and laboratory digital processing systems. The upgrade consists of the purchase and installation of seismic sensors,, data telemetry digital upgrades, a dedicated Seismic Data Processing (SDP) system (already in procurement stage), and a Seismic Signal Analysis (SSA) system. The field stations and telephone telemetry upgrades include equipment necessary for three remote station upgrades including seismic amplifiers, voltage controlled oscillators, pulse calibrators, weather protection (including lightning protection) systems, seismometers, seismic amplifiers, and miscellaneous other parts. The central receiving and recording station upgrades will include discriminators, helicopter amplifier, omega timing system, strong motion instruments, wide-band velocity sensors, and other miscellaneous equipment.

  7. Requirements for GNEP Transmutation Fuels

    SciTech Connect (OSTI)

    D. C. Crawford; M. K. Meyer; S. L. Hayes

    2007-03-01

    The purpose of this document is to provide a baseline set of requirements to guide fuel fabrication development and irradiation testing performed as part of the AFCRD Transmutation Fuel Development Program. This document can be considered a supplement to the GNEP TRU Fuel Development and Qualification Plan, and will be revised as necessary to maintain a documented set of fuel testing objectives and requirements consistent with programmatic decisions and advances in technical knowledge.

  8. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact form Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directives Program Management Emily Stanton, (202) 287-5641 Rachel Mack, (202) 287-6804 Delegation Program Management Gail Cephas,(202) 586-1049 Web Site Administration Technical Support Staff, (505) 663-1302 Fill in this form to contact us. Name Please enter your full name E-Mail (Required) Please enter your

  9. State Energy Price and Expenditure Estimates

    Reports and Publications (EIA)

    2016-01-01

    Energy price and expenditure estimates in dollars per million Btu and in million dollars, by state, 1970-2014.

  10. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  11. New Methodology for Natural Gas Production Estimates

    Reports and Publications (EIA)

    2010-01-01

    A new methodology is implemented with the monthly natural gas production estimates from the EIA-914 survey this month. The estimates, to be released April 29, 2010, include revisions for all of 2009. The fundamental changes in the new process include the timeliness of the historical data used for estimation and the frequency of sample updates, both of which are improved.

  12. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP/NP Requirements Review 2013 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 HEP Attendees 2013 FES Requirements Review 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  13. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  14. Triggering requirements for SSC physics

    SciTech Connect (OSTI)

    Gilchriese, M.G.D.

    1989-04-01

    Some aspects of triggering requirements for high P{sub T} physics processes at the Superconducting Super Collider (SSC) are described. A very wide range of trigger types will be required to enable detection of the large number of potential physics signatures possible at the SSC. Although in many cases trigger rates are not now well understood, it is possible to conclude that the ability to trigger on transverse energy, number and energy of jets, number and energy of leptons (electrons and muons), missing energy and combinations of these will be required. An SSC trigger system must be both highly flexible and redundant to ensure reliable detection of many new physics processes at the SSC.

  15. Directives Requiring Additional Documentation - DOE Directives,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delegations, and Requirements Requiring Additional Documentation by Website Administrator PDF document icon DirectivesRequiringAdditionalDocumentation (1).pdf - PDF document, 35 KB (36219

  16. Digital Data Management Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Digital Data Management Requirements To integrate data management planning into an overall research plan, the following requirements will apply to all Office of Energy ...

  17. Buddy Tag CONOPS and Requirements.

    SciTech Connect (OSTI)

    Brotz, Jay Kristoffer; Deland, Sharon M.

    2015-12-01

    This document defines the concept of operations (CONOPS) and the requirements for the Buddy Tag, which is conceived and designed in collaboration between Sandia National Laboratories and Princeton University under the Department of State Key VerificationAssets Fund. The CONOPS describe how the tags are used to support verification of treaty limitations and is only defined to the extent necessary to support a tag design. The requirements define the necessary functions and desired non-functional features of the Buddy Tag at a high level

  18. Johnson Noise Thermometry System Requirements

    SciTech Connect (OSTI)

    Britton Jr, Charles L; Roberts, Michael; Ezell, N Dianne Bull; Qualls, A L; Holcomb, David Eugene

    2013-01-01

    This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

  19. Microsoft Word - S07566_Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  20. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  1. Robust Bearing Estimation for 3-Component Stations

    SciTech Connect (OSTI)

    Claassen, John P.

    1999-06-03

    A robust bearing estimation process for 3-component stations has been developed and explored. The method, called SEEC for Search, Estimate, Evaluate and Correct, intelligently exploits the in- herent information in the arrival at every step of the process to achieve near-optimal results. In particular, the approach uses a consistent framework to define the optimal time-frequency windows on which to make estimates, to make the bearing estimates themselves, to construct metrics helpful in choosing the better estimates or admitting that the bearing is immeasurable, andjinally to apply bias corrections when calibration information is available to yield a single final estimate. The method was applied to a small but challenging set of events in a seismically active region. The method demonstrated remarkable utility by providing better estimates and insights than previously available. Various monitoring implications are noted fiom these findings.

  2. Robust bearing estimation for 3-component stations

    SciTech Connect (OSTI)

    CLAASSEN,JOHN P.

    2000-02-01

    A robust bearing estimation process for 3-component stations has been developed and explored. The method, called SEEC for Search, Estimate, Evaluate and Correct, intelligently exploits the inherent information in the arrival at every step of the process to achieve near-optimal results. In particular the approach uses a consistent framework to define the optimal time-frequency windows on which to make estimates, to make the bearing estimates themselves, to construct metrics helpful in choosing the better estimates or admitting that the bearing is immeasurable, and finally to apply bias corrections when calibration information is available to yield a single final estimate. The algorithm was applied to a small but challenging set of events in a seismically active region. It demonstrated remarkable utility by providing better estimates and insights than previously available. Various monitoring implications are noted from these findings.

  3. Audio Requirements for the Web

    Broader source: Energy.gov [DOE]

    Audio-only files—whether they are downloaded from a page or distributed via a podcast—must be accessible to all visitors of the Office of Energy Efficiency and Renewable Energy (EERE) website. For developing and posting audio-only files, follow these requirements and best practices.

  4. Reliability Estimates for Power Supplies

    SciTech Connect (OSTI)

    Lee C. Cadwallader; Peter I. Petersen

    2005-09-01

    Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

  5. UCNI Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UCNI Review Requirement UCNI Review Requirement What are the requirements for reviewing a document that may contain UCNI? 1017.15(a) requires you to have a document that may ...

  6. Capabilities required to conduct the LLNL plutonium mission

    SciTech Connect (OSTI)

    Kass, J.; Bish, W.; Copeland, A.; West, J.; Sack, S.; Myers, B.

    1991-09-10

    This report outlines the LLNL plutonium related mission anticipated over the next decade and defines the capabilities required to meet that mission wherever the Plutonium Facility is located. If plutonium work is relocated to a place where the facility is shared, then some capabilities can be commonly used by the sharing parties. However, it is essential that LLNL independently control about 20000 sq ft of net lab space, filled with LLNL controlled equipment, and staffed by LLNL employees. It is estimated that the cost to construct this facility should range from $140M to $200M. Purchase and installation of equipment to replace that already in Bldg 332 along with additional equipment identified as being needed to meet the mission for the next ten to fifteen years, is estimated to cost $118M. About $29M of the equipment could be shared. The Hardened Engineering Test Building (HETB) with its additional 8000 sq ft of unique test capability must also be replaced. The fully equipped replacement cost is estimated to be about $10M. About 40000 sq ft of setup and support space are needed along with office and related facilities for a 130 person resident staff. The setup space is estimated to cost $8M. The annual cost of a 130 person resident staff (100 programmatic and 30 facility operation) is estimated to be $20M.

  7. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  8. Updated Reporting Requirement Checklists and Research Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy ...

  9. Parameter Estimation for Single Diode Models of Photovoltaic Modules

    SciTech Connect (OSTI)

    Hansen, Clifford

    2015-03-01

    Many popular models for photovoltaic system performance employ a single diode model to compute the I - V curve for a module or string of modules at given irradiance and temperature conditions. A single diode model requires a number of parameters to be estimated from measured I - V curves. Many available parameter estimation methods use only short circuit, o pen circuit and maximum power points for a single I - V curve at standard test conditions together with temperature coefficients determined separately for individual cells. In contrast, module testing frequently records I - V curves over a wide range of irradi ance and temperature conditions which, when available , should also be used to parameterize the performance model. We present a parameter estimation method that makes use of a fu ll range of available I - V curves. We verify the accuracy of the method by recov ering known parameter values from simulated I - V curves . We validate the method by estimating model parameters for a module using outdoor test data and predicting the outdoor performance of the module.

  10. Estimating vehicle roadside encroachment frequency using accident prediction models

    SciTech Connect (OSTI)

    Miaou, S.-P.

    1996-07-01

    The existing data to support the development of roadside encroachment- based accident models are extremely limited and largely outdated. Under the sponsorship of the Federal Highway Administration and Transportation Research Board, several roadside safety projects have attempted to address this issue by providing rather comprehensive data collection plans and conducting pilot data collection efforts. It is clear from the results of these studies that the required field data collection efforts will be expensive. Furthermore, the validity of any field collected encroachment data may be questionable because of the technical difficulty to distinguish intentional from unintentional encroachments. This paper proposes an alternative method for estimating the basic roadside encroachment data without actually field collecting them. The method is developed by exploring the probabilistic relationships between a roadside encroachment event and a run-off-the-road event With some mild assumptions, the method is capable of providing a wide range of basic encroachment data from conventional accident prediction models. To illustrate the concept and use of such a method, some basic encroachment data are estimated for rural two-lane undivided roads. In addition, the estimated encroachment data are compared with the existing collected data. The illustration shows that the method described in this paper can be a viable approach to estimating basic encroachment data without actually collecting them which can be very costly.

  11. Notes on a New Coherence Estimator

    SciTech Connect (OSTI)

    Bickel, Douglas L.

    2016-01-01

    This document discusses some interesting features of the new coherence estimator in [1] . The estimator is d erived from a slightly different viewpoint. We discuss a few properties of the estimator, including presenting the probability density function of the denominator of the new estimator , which is a new feature of this estimator . Finally, we present an appr oximate equation for analysis of the sensitivity of the estimator to the knowledge of the noise value. ACKNOWLEDGEMENTS The preparation of this report is the result of an unfunded research and development activity. Sandia National Laboratories is a multi - program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE - AC04 - 94AL85000.

  12. Estimating the releasable source term for Type B packages

    SciTech Connect (OSTI)

    Anderson, B.L.; Carlson, R.W.; Osgood, N.

    1995-11-01

    The release rate criteria for Type B packages designed to transport radioactive materials is given in Title 10 of the Code of Federal Regulations (10 CFR 71). Before the maximum allowable volumetric leakage rate that corresponds to the regulatory release rate can be calculated, estimation of the releasable source term activity density (concentration of releasable radioactive material) is required. This work provides methods for estimating the releasable source term for packages holding various contents types. The contents types considered include: (1) radioactive liquids; (2) radioactive gases; (3) radioactive powders and dispersible solids; (4) non-dispersible radioactive solids and (5) irradiated nuclear fuel rods. The numbers given, especially as related to the source term for packages transporting irradiated fuel rods, are preliminary and are subject to change upon development of improved methods and/or upon review of additional experimental data.

  13. RSMASS: A simple model for estimating reactor and shield masses

    SciTech Connect (OSTI)

    Marshall, A.C.; Aragon, J.; Gallup, D.

    1987-01-01

    A simple mathematical model (RSMASS) has been developed to provide rapid estimates of reactor and shield masses for space-based reactor power systems. Approximations are used rather than correlations or detailed calculations to estimate the reactor fuel mass and the masses of the moderator, structure, reflector, pressure vessel, miscellaneous components, and the reactor shield. The fuel mass is determined either by neutronics limits, thermal/hydraulic limits, or fuel damage limits, whichever yields the largest mass. RSMASS requires the reactor power and energy, 24 reactor parameters, and 20 shield parameters to be specified. This parametric approach should be applicable to a very broad range of reactor types. Reactor and shield masses calculated by RSMASS were found to be in good agreement with the masses obtained from detailed calculations.

  14. Present and Future Computing Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical

  15. Lattice QCD and NERSC requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    QCD and NERSC requirements Rich Brower, Steven Gottlieb and Doug Toussaint November 26, 2012 Rich Brower, Steven Gottlieb and Doug Toussaint () Lattice QCD at NERSC November 26, 2012 1 / 17 Lattice Gauge Theory at NERSC First-principles computations in QCD Computations in other strongly coupled field theories Find hadronic factors to get fundamental physics from experiments Understand structure and interactions of hadrons Understand QCD: confinement and chiral symmetry breaking Other strongly

  16. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Website Administrator The DOE Directives, Regulations, and Requirements Portal is operated by Doxcelerate Corporation for the Office of Information Resources (MA-90). Location: Santa Fe, NM, USA Author's external home page... Select a document from the list below to leave feedback for the writer. For contact information, use the DOE Phonebook. Latest content created by this user May 22, 2015 Recently Approved Justification Memoranda May 20, 2015 DRAFT - DOE O 331.1D, Employee Performance and

  17. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    www.directives.doe.gov Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. New - DOE O 430.1C, Real Property Asset Management https://www.directives.doe.gov/news/0430.1C-new The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting

  18. State energy data report 1994: Consumption estimates

    SciTech Connect (OSTI)

    1996-10-01

    This document provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), operated by EIA. SEDS provides State energy consumption estimates to members of Congress, Federal and State agencies, and the general public, and provides the historical series needed for EIA`s energy models. Division is made for each energy type and end use sector. Nuclear electric power is included.

  19. Methodology for Monthly Crude Oil Production Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    015 U.S. Energy Information Administration | Methodology for Monthly Crude Oil Production Estimates 1 Methodology for Monthly Crude Oil Production Estimates Executive summary The U.S. Energy Information Administration (EIA) relies on data from state and other federal agencies and does not currently collect survey data directly from crude oil producers. Summarizing the estimation process in terms of percent of U.S. production: * 20% is based on state agency data, including North Dakota and

  20. U.S. Uranium Reserves Estimates

    Gasoline and Diesel Fuel Update (EIA)

    Methodology The U.S. uranium ore reserves reported by EIA for specific MFC categories represent the sums of quantities estimated to occur in known deposits on properties where data about the ore grade, configuration, and depth indicate that the quantities estimated could be recovered at or less than the stated costs given current mining and milling technology and regulations. The reserves estimates for year-end (delete: December 31, 2008), are based on historical data for uranium properties

  1. Interruption Cost Estimate Calculator | Open Energy Information

    Open Energy Info (EERE)

    Cost Estimate (ICE) Calculator This calculator is a tool designed for electric reliability planners at utilities, government organizations or other entities that are...

  2. An Estimator of Propagation of Cascading Failure

    SciTech Connect (OSTI)

    Dobson, Ian; Wierzbicki, Kevin; Carreras, Benjamin A; Lynch, Vickie E; Newman, David E

    2006-01-01

    The authors suggest a statistical estimator to measure the extent to which failures propagate in cascading failures such as large blackouts.

  3. ORISE: Radiation Dose Estimates and Other Compendia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rapidly estimate internal and external radiation dose magnitudes that can be used to help ... (PDF) Health Concerns Related to Radiation Exposure of the Female Nuclear Medicine ...

  4. Structure Learning and Statistical Estimation in Distribution...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Structure Learning and Statistical Estimation ... Part I of this paper discusses the problem of learning the operational structure of the ...

  5. Adjusted Estimates of Texas Natural Gas Production

    Reports and Publications (EIA)

    2005-01-01

    The Energy Information Administration (EIA) is adjusting its estimates of natural gas production in Texas for 2004 and 2005 to correctly account for carbon dioxide (CO2) production.

  6. How EIA Estimates Natural Gas Production

    Reports and Publications (EIA)

    2004-01-01

    The Energy Information Administration (EIA) publishes estimates monthly and annually of the production of natural gas in the United States. The estimates are based on data EIA collects from gas producing states and data collected by the U. S. Minerals Management Service (MMS) in the Department of Interior. The states and MMS collect this information from producers of natural gas for various reasons, most often for revenue purposes. Because the information is not sufficiently complete or timely for inclusion in EIA's Natural Gas Monthly (NGM), EIA has developed estimation methodologies to generate monthly production estimates that are described in this document.

  7. Guidelines for Estimating Unmetered Industrial Water Use

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines for Estimating Unmetered Industrial Water Use Prepared for U.S. Department of ... PNNL would like to thank the Federal Water Working Group of the Interagency Energy ...

  8. Guidance on Utility Rate Estimations and Weather Normalization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Rate Estimations and Weather Normalization in an ESPC Guidance on Utility Rate Estimations and Weather Normalization in an ESPC Document explains how to use estimated ...

  9. Cost and Schedule Estimate and Analysis (FPM 207), Amarillo ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Course topics include: identifying cost and schedule estimates; Basic estimating methods; Group analysis techniques; Applying life-cycle costing technique; Validating estimates; ...

  10. Property:Estimated End Date | Open Energy Information

    Open Energy Info (EERE)

    Estimated End Date Jump to: navigation, search Property Name Estimated End Date Property Type String Pages using the property "Estimated End Date" Showing 4 pages using this...

  11. Request for Retirement Annuity Estimates | Department of Energy

    Office of Environmental Management (EM)

    Request for Retirement Annuity Estimates Request for Retirement Annuity Estimates Upon request, Office of the Chief Human Capital Officer provides retirement estimates for ...

  12. West Virginia Dry Natural Gas Reserves Estimated Production ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Estimated Production (Billion Cubic Feet) West Virginia Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production West Virginia Dry Natural Gas Proved ...

  13. Virginia Dry Natural Gas Reserves Estimated Production (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Estimated Production (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production Virginia Dry Natural Gas Proved Reserves Dry ...

  14. New York Dry Natural Gas Reserves Estimated Production (Billion...

    Gasoline and Diesel Fuel Update (EIA)

    Estimated Production (Billion Cubic Feet) New York Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production New York Dry Natural Gas Proved Reserves Dry ...

  15. New Mexico Dry Natural Gas Reserves Estimated Production (Billion...

    Gasoline and Diesel Fuel Update (EIA)

    Estimated Production (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production New Mexico Dry Natural Gas Proved Reserves ...

  16. North Dakota Dry Natural Gas Reserves Estimated Production (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Estimated Production (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production North Dakota Dry Natural Gas Proved Reserves ...

  17. Systematic Approach for Decommissioning Planning and Estimating

    SciTech Connect (OSTI)

    Dam, A. S.

    2002-02-26

    Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

  18. Power, Optimization, Waste Estimating, Resourcing Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    Planning, Optimization, Waste Estimating, Resourcing tool (POWERtool) is a comprehensive relational database software tool that can be used to develop and organize a detailed project scope, plan work tasks, develop bottoms-up field cost and waste estimates for facility Deactivation and Decommissioning (D&D), equipment, and environmental restoration (ER) projects and produces resource-loaded schedules.

  19. Estimating pressurized water reactor decommissioning costs: A user`s manual for the PWR Cost Estimating Computer Program (CECP) software. Draft report for comment

    SciTech Connect (OSTI)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  20. Estimating boiling water reactor decommissioning costs: A user`s manual for the BWR Cost Estimating Computer Program (CECP) software. Final report

    SciTech Connect (OSTI)

    Bierschbach, M.C.

    1996-06-01

    Nuclear power plant licensees are required to submit to the US Nuclear Regulatory Commission (NRC) for review their decommissioning cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning boiling water reactor (BWR) power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  1. Estimating boiling water reactor decommissioning costs. A user`s manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    SciTech Connect (OSTI)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  2. Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries

    SciTech Connect (OSTI)

    Belzer, D.B. ); Serot, D.E. ); Kellogg, M.A. )

    1991-03-01

    Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner that allows evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study, conducted by Pacific Northwest Laboratory (PNL), developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key non-manufacturing sectors. This volume presents tabular and graphical results of the historical analysis and projections for each SIC industry. (JF)

  3. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly ...

  4. Network Requirements Workshop - Documents and Background Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » Documents and Background Materials Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR

  5. Government Printing Office Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Printing Office Requirements Government Printing Office Requirements This section describes the Government Printing Office (GPO) requirements for all print materials, whether printed electronically or on paper. This includes requirements for printing and copying for all EERE publications. Approved Printers Executive Order 12873, signed by President Clinton, requires that all government offices and their contractors are required to use GPO-approved printers to print and copy all

  6. Genome informatics: Requirements and challenges

    SciTech Connect (OSTI)

    Robbins, R.J.

    1993-12-31

    Informatics of some kind will play a role in every aspect of the Human Genome Project (HGP); data acquisition, data analysis, data exchange, data publication, and data visualization. What are the real requirements and challenges? The primary requirement is clear thinking and the main challenge is design. If good design is lacking, the price will be failure of genome informatics and ultimately failure of the genome project itself. Scientists need good designs to deliver the tools necessary for acquiring and analyzing DNA sequences. As these tools become more efficient, they will need new tools for comparative genomic analyses. To make the tools work, the scientists will need to address and solve nomenclature issues that are essential, if also tedious. They must devise systems that will scale gracefully with the increasing flow of data. The scientists must be able to move data easily from one system to another, with no loss of content. As scientists, they will have failed in their responsibility to share results, should repeating experiments ever become preferable to searching the literature. Their databases must become a new kind of scientific literature and the scientists must develop ways to make electronic data publishing as routine as traditional journal publishing. Ultimately, they must build systems so advanced that they are virtually invisible. In summary, the HGP can be considered the most ambitious, most audacious information-management project ever undertaken. In the HGP, computers will not merely serve as tools for cataloging existing knowledge. Rather, they will serve as instruments, helping to create new knowledge by changing the way the scientists see the biological world. Computers will allow them to see genomes, just as radio telescopes let them see quasars and electron microscopes let them see viruses.

  7. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    SciTech Connect (OSTI)

    Melaina, M.; Penev, M.

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  8. Requirements for Bridge Inspection | Department of Energy

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National...

  9. Improving CSE Software through Reproducibility Requirements....

    Office of Scientific and Technical Information (OSTI)

    Improving CSE Software through Reproducibility Requirements. Citation Details In-Document Search Title: Improving CSE Software through Reproducibility Requirements. Abstract not ...

  10. California Waste Discharge Requirements Website | Open Energy...

    Open Energy Info (EERE)

    Requirements Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California Waste Discharge Requirements Website Abstract This website contains...

  11. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised,...

  12. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  13. Cold vacuum drying facility design requirements

    SciTech Connect (OSTI)

    IRWIN, J.J.

    1999-07-01

    This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

  14. Requirements Based Surveillance and Maintenance Review Process...

    Energy Savers [EERE]

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  15. Civilian Radioactive Waste Management System Requirements Document...

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level ...

  16. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O 420.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised, ...

  17. Web Writing Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Web Writing Requirements When writing content for Office of Energy Efficiency and Renewable Energy (EERE) websites and applications, follow these requirements. Also see EERE's Web ...

  18. Uncertainty Estimation Improves Energy Measurement and Verification Procedures

    SciTech Connect (OSTI)

    Walter, Travis; Price, Phillip N.; Sohn, Michael D.

    2014-05-14

    Implementing energy conservation measures in buildings can reduce energy costs and environmental impacts, but such measures cost money to implement so intelligent investment strategies require the ability to quantify the energy savings by comparing actual energy used to how much energy would have been used in absence of the conservation measures (known as the baseline energy use). Methods exist for predicting baseline energy use, but a limitation of most statistical methods reported in the literature is inadequate quantification of the uncertainty in baseline energy use predictions. However, estimation of uncertainty is essential for weighing the risks of investing in retrofits. Most commercial buildings have, or soon will have, electricity meters capable of providing data at short time intervals. These data provide new opportunities to quantify uncertainty in baseline predictions, and to do so after shorter measurement durations than are traditionally used. In this paper, we show that uncertainty estimation provides greater measurement and verification (M&V) information and helps to overcome some of the difficulties with deciding how much data is needed to develop baseline models and to confirm energy savings. We also show that cross-validation is an effective method for computing uncertainty. In so doing, we extend a simple regression-based method of predicting energy use using short-interval meter data. We demonstrate the methods by predicting energy use in 17 real commercial buildings. We discuss the benefits of uncertainty estimates which can provide actionable decision making information for investing in energy conservation measures.

  19. State energy data report 1993: Consumption estimates

    SciTech Connect (OSTI)

    1995-07-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining SEDS is to create historical time series of energy consumption by State that are defined as consistently as possible over time and across sectors. SEDS exists for two principal reasons: (1) to provide State energy consumption estimates to Members of Congress, Federal and State agencies, and the general public; and (2) to provide the historical series necessary for EIA`s energy models.

  20. Parallel State Estimation Assessment with Practical Data

    SciTech Connect (OSTI)

    Chen, Yousu; Jin, Shuangshuang; Rice, Mark J.; Huang, Zhenyu

    2014-10-31

    This paper presents a full-cycle parallel state estimation (PSE) implementation using a preconditioned conjugate gradient algorithm. The developed code is able to solve large-size power system state estimation within 5 seconds using real-world data, comparable to the Supervisory Control And Data Acquisition (SCADA) rate. This achievement allows the operators to know the system status much faster to help improve grid reliability. Case study results of the Bonneville Power Administration (BPA) system with real measurements are presented. The benefits of fast state estimation are also discussed.

  1. State Energy Data Report, 1991: Consumption estimates

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining SEDS is to create historical time series of energy consumption by State that are defined as consistently as possible over time and across sectors. SEDS exists for two principal reasons: (1) to provide State energy consumption estimates to the Government, policy makers, and the public; and (2) to provide the historical series necessary for EIA`s energy models.

  2. State energy data report 1995 - consumption estimates

    SciTech Connect (OSTI)

    1997-12-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sectors. The estimates are developed in the State Energy Data System (SEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining SEDS exists for two principal reasons: (1) to provide State energy consumption estimates to Members of Congress, Federal and State agencies, and the general public, and (2) to provide the historical series necessary for EIA`s energy models.

  3. Estimating Fuel Cycle Externalities: Analytical Methods and Issues, Report 2

    SciTech Connect (OSTI)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1994-07-01

    The activities that produce electric power typically range from extracting and transporting a fuel, to its conversion into electric power, and finally to the disposition of residual by-products. This chain of activities is called a fuel cycle. A fuel cycle has emissions and other effects that result in unintended consequences. When these consequences affect third parties (i.e., those other than the producers and consumers of the fuel-cycle activity) in a way that is not reflected in the price of electricity, they are termed ''hidden'' social costs or externalities. They are the economic value of environmental, health and any other impacts, that the price of electricity does not reflect. How do you estimate the externalities of fuel cycles? Our previous report describes a methodological framework for doing so--called the damage function approach. This approach consists of five steps: (1) characterize the most important fuel cycle activities and their discharges, where importance is based on the expected magnitude of their externalities, (2) estimate the changes in pollutant concentrations or other effects of those activities, by modeling the dispersion and transformation of each pollutant, (3) calculate the impacts on ecosystems, human health, and any other resources of value (such as man-made structures), (4) translate the estimates of impacts into economic terms to estimate damages and benefits, and (5) assess the extent to which these damages and benefits are externalities, not reflected in the price of electricity. Each step requires a different set of equations, models and analysis. Analysts generally believe this to be the best approach for estimating externalities, but it has hardly been used! The reason is that it requires considerable analysis and calculation, and to this point in time, the necessary equations and models have not been assembled. Equally important, the process of identifying and estimating externalities leads to a number of complex issues

  4. Estimating electron drift velocities in magnetron discharges...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Estimating ... OSTI Identifier: 1172974 Report Number(s): LBNL-5865E DOE Contract Number: DE-AC02-05CH11231 Resource Type: Journal ...

  5. Estimating Temperature Distributions In Geothermal Areas Using...

    Open Energy Info (EERE)

    "education level" (which depends on the amount and structure of information used for teaching) and (b) the distance of the point at which the estimate is made from the area for...

  6. A simple method to estimate interwell autocorrelation

    SciTech Connect (OSTI)

    Pizarro, J.O.S.; Lake, L.W.

    1997-08-01

    The estimation of autocorrelation in the lateral or interwell direction is important when performing reservoir characterization studies using stochastic modeling. This paper presents a new method to estimate the interwell autocorrelation based on parameters, such as the vertical range and the variance, that can be estimated with commonly available data. We used synthetic fields that were generated from stochastic simulations to provide data to construct the estimation charts. These charts relate the ratio of areal to vertical variance and the autocorrelation range (expressed variously) in two directions. Three different semivariogram models were considered: spherical, exponential and truncated fractal. The overall procedure is demonstrated using field data. We find that the approach gives the most self-consistent results when it is applied to previously identified facies. Moreover, the autocorrelation trends follow the depositional pattern of the reservoir, which gives confidence in the validity of the approach.

  7. Buildings GHG Mitigation Estimator Worksheet, Version 1

    Broader source: Energy.gov [DOE]

    Xcel document describes Version 1 of the the Buildings GHG Mitigation Estimator tool. This tool assists federal agencies in estimating the greenhouse gas mitigation reduction from implementing energy efficiency measures across a portfolio of buildings. It is designed to be applied to groups of office buildings, for example, at a program level (regional or site) that can be summarized at the agency level. While the default savings and cost estimates apply to office buildings, users can define their own efficiency measures, costs, and savings estimates for inclusion in the portfolio assessment. More information on user-defined measures can be found in Step 2 of the buildings emission reduction guidance. The output of this tool is a prioritized set of activities that can help the agency to achieve its greenhouse gas reduction targets most cost-effectively.

  8. Hydrogen Production Cost Estimate Using Biomass Gasification...

    Broader source: Energy.gov (indexed) [DOE]

    potential of Hydrogen Production Cost Estimate Using Biomass Gasification The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via ...

  9. Preliminary CBECS End-Use Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    For the past three CBECS (1989, 1992, and 1995), we used a statistically-adjusted engineering (SAE) methodology to estimate end-use consumption. The core of the SAE methodology...

  10. Budget estimates, fiscal year 1997. Volume 12

    SciTech Connect (OSTI)

    1996-03-01

    This report contains the fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1997.