National Library of Energy BETA

Sample records for required low-end estimate

  1. Cost Estimating Guide - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, Cost Estimating Guide by Ruben Sanchez Functional areas: Budget and Financial Management, Financial Management This Guide provides uniform guidance and best practices that...

  2. WPN 00-4- Estimated 25% State Cost Share Requirement for the Weatherization Assistance Program for Program Year 2001

    Broader source: Energy.gov [DOE]

    To provide estimated figures for the states to begin their planning for the enacted 25% cost share requirement for funding of the low-income Weatherization Assistance Program beginning with Program Year 2001.

  3. Required cavity HOM deQing calculated from probability estimates of coupled bunch instabilities in the APS ring

    SciTech Connect (OSTI)

    Emery, L.

    1993-06-01

    A method of determining the deQing requirement of individual cavity higher-order modes (HOM) for a multi-cavity RF system is presented and applied to the APS ring. Since HOM resonator frequency values are to some degree uncertain, the HOM frequencies should be regarded as random variables in predicting the stability of the coupled bunch beam modes. A Monte Carlo simulation provides a histogram of the growth rates from which one obtains an estimate of the probability of instability. The damping of each HOM type is determined such that the damping effort is economized, i.e. no single HOM dominates the specified growth rate histogram.

  4. Sample size requirements for estimating effective dose from computed tomography using solid-state metal-oxide-semiconductor field-effect transistor dosimetry

    SciTech Connect (OSTI)

    Trattner, Sigal; Cheng, Bin; Pieniazek, Radoslaw L.; Hoffmann, Udo; Douglas, Pamela S.; Einstein, Andrew J.

    2014-04-15

    Purpose: Effective dose (ED) is a widely used metric for comparing ionizing radiation burden between different imaging modalities, scanners, and scan protocols. In computed tomography (CT), ED can be estimated by performing scans on an anthropomorphic phantom in which metal-oxide-semiconductor field-effect transistor (MOSFET) solid-state dosimeters have been placed to enable organ dose measurements. Here a statistical framework is established to determine the sample size (number of scans) needed for estimating ED to a desired precision and confidence, for a particular scanner and scan protocol, subject to practical limitations. Methods: The statistical scheme involves solving equations which minimize the sample size required for estimating ED to desired precision and confidence. It is subject to a constrained variation of the estimated ED and solved using the Lagrange multiplier method. The scheme incorporates measurement variation introduced both by MOSFET calibration, and by variation in MOSFET readings between repeated CT scans. Sample size requirements are illustrated on cardiac, chest, and abdomenpelvis CT scans performed on a 320-row scanner and chest CT performed on a 16-row scanner. Results: Sample sizes for estimating ED vary considerably between scanners and protocols. Sample size increases as the required precision or confidence is higher and also as the anticipated ED is lower. For example, for a helical chest protocol, for 95% confidence and 5% precision for the ED, 30 measurements are required on the 320-row scanner and 11 on the 16-row scanner when the anticipated ED is 4 mSv; these sample sizes are 5 and 2, respectively, when the anticipated ED is 10 mSv. Conclusions: Applying the suggested scheme, it was found that even at modest sample sizes, it is feasible to estimate ED with high precision and a high degree of confidence. As CT technology develops enabling ED to be lowered, more MOSFET measurements are needed to estimate ED with the same

  5. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  6. Types of Cost Estimates

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The chapter describes the estimates required on government-managed projects for both general construction and environmental management.

  7. Estimating Methods

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Based on the project's scope, the purpose of the estimate, and the availability of estimating resources, the estimator can choose one or a combination of techniques when estimating an activity or project. Estimating methods, estimating indirect and direct costs, and other estimating considerations are discussed in this chapter.

  8. Guidelines for Estimating Unmetered Landscapting Water Use

    SciTech Connect (OSTI)

    None

    2010-07-30

    Guidance to help Federal agencies estimate unmetered landscaping water use as required by Executive Order 13514

  9. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

    SciTech Connect (OSTI)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  10. Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report

    SciTech Connect (OSTI)

    Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

    1995-11-01

    With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

  11. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report

    SciTech Connect (OSTI)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

    1996-07-01

    The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

  12. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  13. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... contracts for capital asset projects, decontamination & ... parametric estimates, and models, etc; and other ... by cost element, for the allocation pool and the allocation ...

  14. Animation Requirements

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  15. Examples of Cost Estimation Packages

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

  16. Eligibility Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligibility and required supporting documentation The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to enroll in the HDHP medical plan. Refer

  17. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  18. Competition Requirements

    Office of Environmental Management (EM)

    - Chapter 6.1 (January 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3.

  19. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  20. Video Requirements

    Broader source: Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  1. Deployment Requirements

    Broader source: Energy.gov (indexed) [DOE]

    Troy, Michigan June 13, 2014 THIS PRESENTATION DOES NOT CONTAIN ANY PROPRIETARY, CONFIDENTIAL OR OTHERWISE RESTRICTED INFORMATION 2 Outline of talk * SAE 2719 Requirements and ...

  2. Determining Allocation Requirements | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feedback Form Determining Allocation Requirements Estimating CPU-Hours for ALCF Blue GeneQ Systems When estimating CPU-hours for the ALCF Blue GeneQ systems, it is...

  3. Magnetic nanoparticle temperature estimation

    SciTech Connect (OSTI)

    Weaver, John B.; Rauwerdink, Adam M.; Hansen, Eric W.

    2009-05-15

    The authors present a method of measuring the temperature of magnetic nanoparticles that can be adapted to provide in vivo temperature maps. Many of the minimally invasive therapies that promise to reduce health care costs and improve patient outcomes heat tissue to very specific temperatures to be effective. Measurements are required because physiological cooling, primarily blood flow, makes the temperature difficult to predict a priori. The ratio of the fifth and third harmonics of the magnetization generated by magnetic nanoparticles in a sinusoidal field is used to generate a calibration curve and to subsequently estimate the temperature. The calibration curve is obtained by varying the amplitude of the sinusoidal field. The temperature can then be estimated from any subsequent measurement of the ratio. The accuracy was 0.3 deg. K between 20 and 50 deg. C using the current apparatus and half-second measurements. The method is independent of nanoparticle concentration and nanoparticle size distribution.

  4. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  5. gtp_flow_power_estimator.xlsx

    Broader source: Energy.gov [DOE]

    This simple spreadsheet model estimates either the flow rate required to produce a specified level of power output, or the power output that can be produced from a specified flow rate.

  6. Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, draft report for comment. Volume 2

    SciTech Connect (OSTI)

    Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.

    1994-09-01

    On June 27, 1988, the U.S. Nuclear Regulatory Commission (NRC) published in the Federal Register (53 FR 24018) the final rule for the General Requirements for Decommissioning Nuclear Facilities. With the issuance of the final rule, owners and operators of licensed nuclear power plants are required to prepare, and submit to the NRC for review, decommissioning plans and cost estimates. The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s WNP-2, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives, which now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste. Costs for labor, materials, transport, and disposal activities are given in 1993 dollars. Sensitivities of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances are also examined.

  7. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  8. State Energy Production Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Production Estimates 1960 Through 2012 2012 Summary Tables Table P1. Energy Production Estimates in Physical Units, 2012 Alabama 19,455 215,710 9,525 0 Alaska 2,052 351,259...

  9. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  10. FES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  11. Requirements for Wind Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2015 Oklahoma amended the Oklahoma Wind Energy Development Act. The amendments added new financial security requirements, setback requirements, and notification requirements for wind energy...

  12. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  13. Network Requirements Reviews

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous...

  14. Reservoir Temperature Estimator

    Energy Science and Technology Software Center (OSTI)

    2014-12-08

    The Reservoir Temperature Estimator (RTEst) is a program that can be used to estimate deep geothermal reservoir temperature and chemical parameters such as CO2 fugacity based on the water chemistry of shallower, cooler reservoir fluids. This code uses the plugin features provided in The Geochemist’s Workbench (Bethke and Yeakel, 2011) and interfaces with the model-independent parameter estimation code Pest (Doherty, 2005) to provide for optimization of the estimated parameters based on the minimization of themore » weighted sum of squares of a set of saturation indexes from a user-provided mineral assemblage.« less

  15. Technology Requirements for In-Situ Decommissioning Workshop...

    Office of Environmental Management (EM)

    ... ISD-Specific performance models are required to estimate sustained performance and are the means to integrate the wide-range data set to validate andor adjust performance ...

  16. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

  17. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  18. Science Requirements Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  19. BER Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  20. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  1. Feed tank transfer requirements

    SciTech Connect (OSTI)

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  2. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  3. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    The objective of this Guide is to improve the quality of cost estimates and further strengthen the DOE program/project management system. The original 25 separate chapters and three appendices have been combined to create a single document.

  4. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  5. Derived Annual Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    74-1988 For Methodology Concerning the Derived Estimates Total Consumption of Offsite-Produced Energy for Heat and Power by Industry Group, 1974-1988 Total Energy *** Electricity...

  6. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Air Act (CAA) Requirements for air quality and air emissions from facility operations Clean Water Act (CWA) Requirements for water quality and water discharges from facility...

  7. Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Editors, "High Energy Physics and Nuclear Physics Network Requirements - Final Report", ESnet Network Requirements Workshop, August 2013, LBNL 6642E Download File: HEP-NP-Net-Req...

  8. Independent Cost Estimate (ICE)

    Broader source: Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  9. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect (OSTI)

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  10. Forward estimation for game-tree search

    SciTech Connect (OSTI)

    Zhang, Weixiong

    1996-12-31

    It is known that bounds on the minimax values of nodes in a game tree can be used to reduce the computational complexity of minimax search for two-player games. We describe a very simple method to estimate bounds on the minimax values of interior nodes of a game tree, and use the bounds to improve minimax search. The new algorithm, called forward estimation, does not require additional domain knowledge other than a static node evaluation function, and has small constant overhead per node expansion. We also propose a variation of forward estimation, which provides a tradeoff between computational complexity and decision quality. Our experimental results show that forward estimation outperforms alpha-beta pruning on random game trees and the game of Othello.

  11. Lensed CMB simulation and parameter estimation

    SciTech Connect (OSTI)

    Lewis, Antony

    2005-04-15

    Modelling of the weak lensing of the CMB will be crucial to obtain correct cosmological parameter constraints from forthcoming precision CMB anisotropy observations. The lensing affects the power spectrum as well as inducing non-Gaussianities. We discuss the simulation of full-sky CMB maps in the weak lensing approximation and describe a fast numerical code. The series expansion in the deflection angle cannot be used to simulate accurate CMB maps, so a pixel remapping must be used. For parameter estimation accounting for the change in the power spectrum but assuming Gaussianity is sufficient to obtain accurate results up to Planck sensitivity using current tools. A fuller analysis may be required to obtain accurate error estimates and for more sensitive observations. We demonstrate a simple full-sky simulation and subsequent parameter estimation at Planck-like sensitivity. The lensed CMB simulation and parameter estimation codes are publicly available.

  12. Parametric Hazard Function Estimation.

    Energy Science and Technology Software Center (OSTI)

    1999-09-13

    Version 00 Phaze performs statistical inference calculations on a hazard function (also called a failure rate or intensity function) based on reported failure times of components that are repaired and restored to service. Three parametric models are allowed: the exponential, linear, and Weibull hazard models. The inference includes estimation (maximum likelihood estimators and confidence regions) of the parameters and of the hazard function itself, testing of hypotheses such as increasing failure rate, and checking ofmore » the model assumptions.« less

  13. REQUESTS FOR RETIREMENT ESTIMATE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REQUEST FOR RETIREMENT ANNUITY ESTIMATE Instructions: Please read and answer the following questions thoroughly to include checking all applicable boxes. Unanswered questions may delay processing. Print and Fax back your request form to 202.586.6395 or drop request to GM-169. The request will be assigned to your servicing retirement specialist. They will confirm receipt of your request. SECTION A Request Submitted _____________________ ______________________ ________________________

  14. Weekly Coal Production Estimation Methodology

    Gasoline and Diesel Fuel Update (EIA)

    Weekly Coal Production Estimation Methodology Step 1 (Estimate total amount of weekly U.S. coal production) U.S. coal production for the current week is estimated using a ratio ...

  15. Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Requirements Statutes 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air ...

  16. Requirements Management Database

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This application is a simplified and customized version of the RBA and CTS databases to capture federal, site, and facility requirements, link to actions that must be performed to maintain compliance with their contractual and other requirements.

  17. ARM - Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    StatisticsReporting Requirements 2016 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) Past Quarterly Reports Historical Statistics Field Campaigns Operational Visitors and Accounts Data Archive and Usage (October 1995 - Present) Reporting Requirements As a matter of government policy, all U.S. Department of Energy user facilities, including the ARM Climate Research Facility, have a number of reporting requirements. The Facility is required to

  18. PIT Coating Requirements Analysis

    SciTech Connect (OSTI)

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  19. Requirement-Reviews.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  20. RMACS software requirements specification

    SciTech Connect (OSTI)

    Gneiting, B.C.

    1996-10-01

    This document defines the essential user (or functional) requirements of the Requirements Management and Assured Compliance System (RMACS), which is used by the Tank Waste Remediation System program (TWRS). RMACS provides a computer-based environment that TWRS management and systems engineers can use to identify, define, and document requirements. The intent of the system is to manage information supporting definition of the TWRS technical baseline using a structured systems engineering process. RMACS has the capability to effectively manage a complete set of complex requirements and relationships in a manner that satisfactorily assures compliance to the program requirements over the TWRS life-cycle.

  1. State Energy Production Estimates

    Gasoline and Diesel Fuel Update (EIA)

    Production Estimates 1960 Through 2014 2014 Summary Tables U.S. Energy Information Administration | State Energy Data 2014: Production 1 Table P1. Energy Production Estimates in Physical Units, 2014 Alabama 16,377 181,054 9,828 0 Alaska 1,502 345,331 181,175 0 Arizona 8,051 106 56 1,044 Arkansas 94 1,123,678 6,845 0 California 0 252,718 204,269 4,462 Colorado 24,007 1,631,391 95,192 3,133 Connecticut 0 0 0 0 Delaware 0 0 0 0 District of Columbia 0 0 0 0 Florida 0 369 2,227 0 Georgia 0 0 0 2,517

  2. Other Requirements - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Other Requirements by Website Administrator More filters Less filters Other Policy Type Secretarial Memo Program Office Memo Invoked Technical Standards 100 Office of Primary Interest (OPI) Office of Primary Interest (OPI) All AD - Office of Administrative Services AU - Office of Environment, Health, Safety and Security CF - Office of the Chief Financial Officer CI - Office of Congressional and Intergovernmental Affairs CN - Office of Counterintelligence CP - Office of the Press Secretary CR -

  3. Use of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

  4. Guidelines for Estimating Unmetered Landscaping Water Use | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Landscaping Water Use Guidelines for Estimating Unmetered Landscaping Water Use Document describes the step-by-step instructions to estimate landscaping water using two alternative approaches: the evapotranspiration method and the irrigation audit method. This report presents annual irrigation factors for 36 cities across the United States that represent the gallons of irrigation required per square foot for distinct landscape types. Download the Guidelines for Estimating Unmetered

  5. Battery Calendar Life Estimator Manual Modeling and Simulation

    SciTech Connect (OSTI)

    Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

    2012-10-01

    The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

  6. Battery Life Estimator Manual Linear Modeling and Simulation

    SciTech Connect (OSTI)

    Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

    2009-08-01

    The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

  7. Cost estimate guidelines for advanced nuclear power technologies

    SciTech Connect (OSTI)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs.

  8. BES Science Network Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  9. ASCR Requirements Review 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASCR Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  10. BES Requirements Review 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BES Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  11. Unreviewed Safety Question Requirements

    Office of Environmental Management (EM)

    DOE G 424.1-1, Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements Performance Objective 1: Contractor Program Documentation 1. The USQ ...

  12. Transuranic Waste Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  13. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

  14. Residential Solar Permit Requirements

    Broader source: Energy.gov [DOE]

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  15. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Portability and Accountability Act of 1996 (HIPAA) imposes numerous requirements on employer health plans concerning the use and disclosure of individual health information. ...

  16. ESnet Requirements Workshops

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Workshops Summary for Sites Eli Dart, Network Engineer ESnet Network Engineering Group ESnet Site Coordinating Committee Meeting Clemson, SC February 2, 2011 Lawrence ...

  17. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  18. General Responsibilities and Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  19. Writing testable software requirements

    SciTech Connect (OSTI)

    Knirk, D.

    1997-11-01

    This tutorial identifies common problems in analyzing requirements in the problem and constructing a written specification of what the software is to do. It deals with two main problem areas: identifying and describing problem requirements, and analyzing and describing behavior specifications.

  20. Integrated Management Requirements mapping

    SciTech Connect (OSTI)

    Holmes, J.T.; Andrews, N.S.

    1992-06-01

    This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

  1. Integrated Management Requirements mapping

    SciTech Connect (OSTI)

    Holmes, J.T.; Andrews, N.S.

    1992-06-01

    This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

  2. Automated Estimating System

    Energy Science and Technology Software Center (OSTI)

    1996-04-15

    AES6.1 is a PC software package developed to aid in the preparation and reporting of cost estimates. AES6.1 provides an easy means for entering and updating the detailed cost, schedule information, project work breakdown structure, and escalation information contained in a typical project cost estimate through the use of menus and formatted input screens. AES6.1 combines this information to calculate both unescalated and escalated cost for a project which can be reported at varying levelsmore » of detail. Following are the major modifications to AES6.0f: Contingency update was modified to provide greater flexibility for user updates, Schedule Update was modified to provide user ability to schedule Bills of Material at the WBS/Participant/Cost Code level, Schedule Plot was modified to graphically show schedule by WBS/Participant/Cost Code, All Fiscal Year reporting has been modified to use the new schedule format, The Schedule 1-B-7, Cost Schedule, and the WBS/Participant reprorts were modified to determine Phase of Work from the B/M Cost Code, Utility program was modified to allow selection by cost code and update cost code in the Global Schedule update, Generic summary and line item download were added to the utility program, and an option was added to all reports which allows the user to indicate where overhead is to be reported (bottom line or in body of report)« less

  3. Guidelines for Estimating Unmetered Landscaping Water Use

    SciTech Connect (OSTI)

    McMordie Stoughton, Kate

    2010-07-28

    The document lays-out step by step instructions to estimate landscaping water using two alternative approaches: evapotranspiration method and irrigation audit method. The evapotranspiration method option calculates the amount of water needed to maintain a healthy turf or landscaped area for a given location based on the amount of water transpired and evaporated from the plants. The evapotranspiration method offers a relatively easy one-stop-shop for Federal agencies to develop an initial estimate of annual landscape water use. The document presents annual irrigation factors for 36 cities across the U.S. that represents the gallons of irrigation required per square foot for distinct landscape types. By following the steps outlined in the document, the reader can choose a location that is a close match their location and landscape type to provide a rough estimate of annual irrigation needs without the need to research specific data on their site. The second option presented in the document is the irrigation audit method, which is the physical measurement of water applied to landscaped areas through irrigation equipment. Steps to perform an irrigation audit are outlined in the document, which follow the Recommended Audit Guidelines produced by the Irrigation Association.[5] An irrigation audit requires some knowledge on the specific procedures to accurately estimate how much water is being consumed by the irrigation equipment.

  4. Robust Optical Richness Estimation with Reduced Scatter

    SciTech Connect (OSTI)

    Rykoff, E.S.; Koester, B.P.; Rozo, E.; Annis, J.; Evrard, A.E.; Hansen, S.M.; Hao, J.; Johnston, D.E.; McKay, T.A.; Wechsler, R.H.; /KIPAC, Menlo Park /SLAC

    2012-06-07

    Reducing the scatter between cluster mass and optical richness is a key goal for cluster cosmology from photometric catalogs. We consider various modifications to the red-sequence matched filter richness estimator of Rozo et al. (2009b), and evaluate their impact on the scatter in X-ray luminosity at fixed richness. Most significantly, we find that deeper luminosity cuts can reduce the recovered scatter, finding that {sigma}{sub ln L{sub X}|{lambda}} = 0.63 {+-} 0.02 for clusters with M{sub 500c} {approx}> 1.6 x 10{sup 14} h{sub 70}{sup -1} M{sub {circle_dot}}. The corresponding scatter in mass at fixed richness is {sigma}{sub ln M|{lambda}} {approx} 0.2-0.3 depending on the richness, comparable to that for total X-ray luminosity. We find that including blue galaxies in the richness estimate increases the scatter, as does weighting galaxies by their optical luminosity. We further demonstrate that our richness estimator is very robust. Specifically, the filter employed when estimating richness can be calibrated directly from the data, without requiring a-priori calibrations of the red-sequence. We also demonstrate that the recovered richness is robust to up to 50% uncertainties in the galaxy background, as well as to the choice of photometric filter employed, so long as the filters span the 4000 {angstrom} break of red-sequence galaxies. Consequently, our richness estimator can be used to compare richness estimates of different clusters, even if they do not share the same photometric data. Appendix A includes 'easy-bake' instructions for implementing our optimal richness estimator, and we are releasing an implementation of the code that works with SDSS data, as well as an augmented maxBCG catalog with the {lambda} richness measured for each cluster.

  5. Hanford ETR- Tank Waste Treatment and Immobilization Plant- Hanford Tank Waste Treatment and Immobilization Plant Technical Review- Estimate at Completion (Cost) Report

    Broader source: Energy.gov [DOE]

    This is a comprehensive review of the Hanford WTP estimate at completion - assessing the project scope, contract requirements, management execution plant, schedule, cost estimates, and risks.

  6. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an...

  7. Green Building Requirement

    Office of Energy Efficiency and Renewable Energy (EERE)

    The new standards are phased in over the course of several years with publicly-owned buildings being the first required to comply. All new construction and substantial improvements of non...

  8. Requirements for security signalling

    SciTech Connect (OSTI)

    Pierson, L.G.; Tarman, T.D.

    1995-02-05

    There has been some interest lately in the need for ``authenticated signalling``, and the development of signalling specifications by the ATM Forum that support this need. The purpose of this contribution is to show that if authenticated signalling is required, then supporting signalling facilities for directory services (i.e. key management) are also required. Furthermore, this contribution identifies other security related mechanisms that may also benefit from ATM-level signalling accommodations. For each of these mechanisms outlined here, an overview of the signalling issues and a rough cut at the required fields for supporting Information Elements are provided. Finally, since each of these security mechanisms are specified by a number of different standards, issues pertaining to the selection of a particular security mechanism at connection setup time (i.e. specification of a required ``Security Quality of Service``) are also discussed.

  9. Selected Guidance & Requirements

    Broader source: Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  10. Promulgating Nuclear Safety Requirements

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-05-15

    Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

  11. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  12. Regulators, Requirements, Statutes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental

  13. CONTAMINATED SOIL VOLUME ESTIMATE TRACKING METHODOLOGY

    SciTech Connect (OSTI)

    Durham, L.A.; Johnson, R.L.; Rieman, C.; Kenna, T.; Pilon, R.

    2003-02-27

    The U.S. Army Corps of Engineers (USACE) is conducting a cleanup of radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The largest cost element for most of the FUSRAP sites is the transportation and disposal of contaminated soil. Project managers and engineers need an estimate of the volume of contaminated soil to determine project costs and schedule. Once excavation activities begin and additional remedial action data are collected, the actual quantity of contaminated soil often deviates from the original estimate, resulting in cost and schedule impacts to the project. The project costs and schedule need to be frequently updated by tracking the actual quantities of excavated soil and contaminated soil remaining during the life of a remedial action project. A soil volume estimate tracking methodology was developed to provide a mechanism for project managers and engineers to create better project controls of costs and schedule. For the FUSRAP Linde site, an estimate of the initial volume of in situ soil above the specified cleanup guidelines was calculated on the basis of discrete soil sample data and other relevant data using indicator geostatistical techniques combined with Bayesian analysis. During the remedial action, updated volume estimates of remaining in situ soils requiring excavation were calculated on a periodic basis. In addition to taking into account the volume of soil that had been excavated, the updated volume estimates incorporated both new gamma walkover surveys and discrete sample data collected as part of the remedial action. A civil survey company provided periodic estimates of actual in situ excavated soil volumes. By using the results from the civil survey of actual in situ volumes excavated and the updated estimate of the remaining volume of contaminated soil requiring excavation, the USACE Buffalo District was able to forecast and update project costs and schedule. The soil volume

  14. Cost Estimating, Analysis, and Standardization

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1984-11-02

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  15. NP Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  16. Requirements | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Requirements Students must earn a total of 11 points from the following options: Please note: To receive points toward the certificate, student are required to submit...

  17. Sub-Second Parallel State Estimation

    SciTech Connect (OSTI)

    Chen, Yousu; Rice, Mark J.; Glaesemann, Kurt R.; Wang, Shaobu; Huang, Zhenyu

    2014-10-31

    This report describes the performance of Pacific Northwest National Laboratory (PNNL) sub-second parallel state estimation (PSE) tool using the utility data from the Bonneville Power Administrative (BPA) and discusses the benefits of the fast computational speed for power system applications. The test data were provided by BPA. They are two-days’ worth of hourly snapshots that include power system data and measurement sets in a commercial tool format. These data are extracted out from the commercial tool box and fed into the PSE tool. With the help of advanced solvers, the PSE tool is able to solve each BPA hourly state estimation problem within one second, which is more than 10 times faster than today’s commercial tool. This improved computational performance can help increase the reliability value of state estimation in many aspects: (1) the shorter the time required for execution of state estimation, the more time remains for operators to take appropriate actions, and/or to apply automatic or manual corrective control actions. This increases the chances of arresting or mitigating the impact of cascading failures; (2) the SE can be executed multiple times within time allowance. Therefore, the robustness of SE can be enhanced by repeating the execution of the SE with adaptive adjustments, including removing bad data and/or adjusting different initial conditions to compute a better estimate within the same time as a traditional state estimator’s single estimate. There are other benefits with the sub-second SE, such as that the PSE results can potentially be used in local and/or wide-area automatic corrective control actions that are currently dependent on raw measurements to minimize the impact of bad measurements, and provides opportunities to enhance the power grid reliability and efficiency. PSE also can enable other advanced tools that rely on SE outputs and could be used to further improve operators’ actions and automated controls to mitigate effects

  18. Contractor Legal Management Requirements

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  19. Requirements for Xenon International

    SciTech Connect (OSTI)

    Hayes, James C.; Ely, James H.; Haas, Derek A.; Harper, Warren W.; Heimbigner, Tom R.; Hubbard, Charles W.; Humble, Paul H.; Madison, Jill C.; Morris, Scott J.; Panisko, Mark E.; Ripplinger, Mike D.; Stewart, Timothy L.

    2015-12-30

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  20. Managing routine bioassay requirements

    SciTech Connect (OSTI)

    Baumann, B.L., Westinghouse Hanford, Richland, WA

    1997-10-08

    The Hanford Site is a very diverse Department of Energy (DOE) Nuclear Site in Eastern Washington State that includes: retired reactor facilities, spent fuel storage facilities, chemical separations facilities, laboratories, and plutonium separations facilities. As a result worker routine bioassays requirements may include routine whole body counting for mixed fission products, chest counting for uranium or plutonium, and/or urinalyses for plutonium, ura@u@ strontium-90, and tritium depending on work assignments. In such a situation it is easy to perform unnecessary bioassays and incur unnecessary cost. Program Implementation Fluor Daniel Hanford has been working with the Pacific Northwest National. Laboratories to reduce the number of routine bioassays in the internal dosimetry program while ensuring the program is compliant with regulatory requirements. This has been accomplished by: 1. Clearly identifying what work requires routine bioassay 2. Clearly identifying what routine bioassay is required 3. Having a system in place to make sure personnel who need routine bioassay get it and 4. Taking measures to ensure that workers who doiVt need routine bioassay don`t get it.

  1. Requirements Definition Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

  2. Data Crosscutting Requirements Review

    SciTech Connect (OSTI)

    Kleese van Dam, Kerstin; Shoshani, Arie; Plata, Charity

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  3. Requirements for Xenon International

    SciTech Connect (OSTI)

    Hayes, James C.; Ely, James H.

    2013-09-26

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  4. Software Requirements Specification Verifiable Fuel Cycle Simulation (VISION) Model

    SciTech Connect (OSTI)

    D. E. Shropshire; W. H. West

    2005-11-01

    The purpose of this Software Requirements Specification (SRS) is to define the top-level requirements for a Verifiable Fuel Cycle Simulation Model (VISION) of the Advanced Fuel Cycle (AFC). This simulation model is intended to serve a broad systems analysis and study tool applicable to work conducted as part of the AFCI (including costs estimates) and Generation IV reactor development studies.

  5. Budget estimates. Fiscal year 1998

    SciTech Connect (OSTI)

    1997-02-01

    The U.S. Congress has determined that the safe use of nuclear materials for peaceful purposes is a legitimate and important national goal. It has entrusted the Nuclear Regulatory Commission (NRC) with the primary Federal responsibility for achieving that goal. The NRC`s mission, therefore, is to regulate the Nation`s civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. The NRC`s FY 1998 budget requests new budget authority of $481,300,000 to be funded by two appropriations - one is the NRC`s Salaraies and Expenses appropriation for $476,500,000, and the other is NRC`s Office of Inspector General appropriation for $4,800,000. Of the funds appropriated to the NRC`s Salaries and Expenses, $17,000,000, shall be derived from the Nuclear Waste Fund and $2,000,000 shall be derived from general funds. The proposed FY 1998 appropriation legislation would also exempt the $2,000,000 for regulatory reviews and other assistance provided to the Department of Energy from the requirement that the NRC collect 100 percent of its budget from fees. The sums appropriated to the NRC`s Salaries and Expenses and NRC`s Office of Inspector General shall be reduced by the amount of revenues received during FY 1998 from licensing fees, inspection services, and other services and collections, so as to result in a final FY 1998 appropriation for the NRC of an estimated $19,000,000 - the amount appropriated from the Nuclear Waste Fund and from general funds. Revenues derived from enforcement actions shall be deposited to miscellaneous receipts of the Treasury.

  6. Time and Resource Estimation Tool

    Energy Science and Technology Software Center (OSTI)

    2004-06-08

    RESTORE is a computer software tool that allows one to model a complex set of steps required to accomplish a goal (e.g., repair a ruptured natural gas pipeline and restore service to customers). However, the time necessary to complete step may be uncertain and may be affected by conditions, such as the weather, the time of day, the day of the week. Therefore, "nature" can influence which steps are taken and the time needed tomore » complete each step. In addition, the tool allows one to model the costs for each step, which also may be uncertain. RESTORE allows the user to estimate the time and cost, both of which may be uncertain, to achieve an intermediate stage of completion, as well as overall completion. The software also makes it possible to model parallel, competing groups of activities (i.e., parallel paths) so that progreSs at a ‘merge point’ can proceed before other competing activities are completed. For example, RESTORE permits one to model a workaround and a simultaneous complete repair to determine a probability distribution for the earliest time service can be restored to a critical customer. The tool identifies the ‘most active path’ through the network of tasks, which is extremely important information for assessing the most effective way to speed-up or slow-down progress. Unlike other project planning and risk analysis tools, RESTORE provides an intuitive, graphical, and object-oriented environment for structuring a model and setting its parameters.« less

  7. Supercooled liquid water Estimation Tool

    Energy Science and Technology Software Center (OSTI)

    2012-05-04

    The Cloud Supercooled liquid water Estimation Tool (SEET) is a user driven Graphical User Interface (GUI) that estimates cloud supercooled liquid water (SLW) content in terms of vertical column and total mass from Moderate resolution Imaging Supercooled liquid water Estimation Tool Spectroradiometer (MODIS) spatially derived cloud products and realistic vertical cloud parameterizations that are user defined. It also contains functions for post-processing of the resulting data in tabular and graphical form.

  8. Robust and intelligent bearing estimation

    DOE Patents [OSTI]

    Claassen, John P.

    2000-01-01

    A method of bearing estimation comprising quadrature digital filtering of event observations, constructing a plurality of observation matrices each centered on a time-frequency interval, determining for each observation matrix a parameter such as degree of polarization, linearity of particle motion, degree of dyadicy, or signal-to-noise ratio, choosing observation matrices most likely to produce a set of best available bearing estimates, and estimating a bearing for each observation matrix of the chosen set.

  9. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  10. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  11. LASSO* - Science Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LASSO* - Science Requirements *LES ARM Symbiotic Simulation and Observation (LASSO) workflow Andy Vogelmann 1 , William I Gustafson Jr 2 Zhijin Li 3,4 , Xiaoping Cheng 3 , Satoshi Endo 1 , Tami Toto 1 , and Heng Xiao 2 1 Brookhaven National Laboratory 2 Pacific Northwest National Laboratory 3 University of California Los Angeles 4 NASA Jet Propulsion Laboratory And TONS of people from the rest of ARM! LASSO Webpage: http://www.arm.gov/science/themes/lasso LASSO e-mail list sign up:

  12. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  13. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  14. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  15. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the

  16. Experiment Safety Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an Experiment Safety Sheet? (Do this upon receiving beam time.) Complete Safety Training? Bring and Use Electrical Equipment at the ALS? Determine what Personal Protective Equipment (PPE) to Wear? Get Authorization to Work with Lasers at the ALS? Ship Radioactive Materials to LBNL for Use at the ALS? Ship Samples

  17. LEGACY MANAGEMENT REQUIRES INFORMATION

    SciTech Connect (OSTI)

    CONNELL, C.W.; HILDEBRAND, R.D.

    2006-12-14

    ''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

  18. BER Science Network Requirements

    SciTech Connect (OSTI)

    Alapaty, Kiran; Allen, Ben; Bell, Greg; Benton, David; Brettin, Tom; Canon, Shane; Dart, Eli; Cotter, Steve; Crivelli, Silvia; Carlson, Rich; Dattoria, Vince; Desai, Narayan; Egan, Richard; Tierney, Brian; Goodwin, Ken; Gregurick, Susan; Hicks, Susan; Johnston, Bill; de Jong, Bert; Kleese van Dam, Kerstin; Livny, Miron; Markowitz, Victor; McGraw, Jim; McCord, Raymond; Oehmen, Chris; Regimbal, Kevin; Shipman, Galen; Strand, Gary; Flick, Jeff; Turnbull, Susan; Williams, Dean; Zurawski, Jason

    2010-11-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

  19. STOCHASTIC COOLING POWER REQUIREMENTS.

    SciTech Connect (OSTI)

    WEI,J.BLASKIEWICZ,M.BRENNAN,M.

    2004-07-05

    A practical obstacle for stochastic cooling in high-energy colliders like RHIC is the large amount of power needed for the cooling system. Based on the coasting-beam Fokker-Planck (F-P) equation, we analytically derived the optimum cooling rate and cooling power for a beam of uniform distribution and a cooling system of linear gain function. The results indicate that the usual back-of-envelope formula over-estimated the cooling power by a factor of the mixing factor M. On the other hand, the scaling laws derived from the coasting-beam Fokker-Planck approach agree with those derived from the bunched-beam Fokker-Planck approach if the peak beam intensity is used as the effective coasting-beam intensity. A longitudinal stochastic cooling system of 4-8 GHz bandwidth in RHIC can effectively counteract intrabeam scattering, preventing the beam from escaping the RF bucket becoming debunched around the ring.

  20. Energy requirements of the switchable polarity solvent forward osmosis

    Office of Scientific and Technical Information (OSTI)

    (SPS-FO) water purification process (Journal Article) | SciTech Connect Journal Article: Energy requirements of the switchable polarity solvent forward osmosis (SPS-FO) water purification process Citation Details In-Document Search Title: Energy requirements of the switchable polarity solvent forward osmosis (SPS-FO) water purification process A model was developed to estimate the process energy requirements of a switchable polarity solvent forward osmosis (SPS FO) system for water

  1. Derived Annual Estimates of Manufacturing Energy Consumption...

    U.S. Energy Information Administration (EIA) Indexed Site

    > Derived Annual Estimates - Executive Summary Derived Annual Estimates of Manufacturing Energy Consumption, 1974-1988 Figure showing Derived Estimates Executive Summary This...

  2. Required Annual Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Token Requesting A Token RSA_SecurID_SID800.jpg Step One - Registering with the DOE's Management Information System (MIS) Before you request a DOE Digital Identity, you must register in DOE's Management Information System (MIS). Please note that DOE Federal employees are already registered and do not need to complete this step. They may skip to step two. During the registration process, you will be required to select a DOE sponsor. Your sponsor is the DOE employee who certifies that you have a

  3. BES Science Network Requirements

    SciTech Connect (OSTI)

    Biocca, Alan; Carlson, Rich; Chen, Jackie; Cotter, Steve; Tierney, Brian; Dattoria, Vince; Davenport, Jim; Gaenko, Alexander; Kent, Paul; Lamm, Monica; Miller, Stephen; Mundy, Chris; Ndousse, Thomas; Pederson, Mark; Perazzo, Amedeo; Popescu, Razvan; Rouson, Damian; Sekine, Yukiko; Sumpter, Bobby; Dart, Eli; Wang, Cai-Zhuang -Z; Whitelam, Steve; Zurawski, Jason

    2011-02-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

  4. Module: Estimating Historical Emissions from Deforestation |...

    Open Energy Info (EERE)

    Website: www.leafasia.orgtoolstechnical-guidance-series-estimating-historical Cost: Free Language: English Module: Estimating Historical Emissions from Deforestation Screenshot...

  5. Development of surface mine cost estimating equations

    SciTech Connect (OSTI)

    Not Available

    1980-09-26

    Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

  6. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  7. communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements NBP RFI: Communications Requirements- Comments of Lake Region Electric Cooperative- Minnesota

  8. Estimate Radiological Dose for Animals

    Energy Science and Technology Software Center (OSTI)

    1997-12-18

    Estimate Radiological dose for animals in ecological environment using open literature values for parameters such as body weight, plant and soil ingestion rate, rad. halflife, absorbed energy, biological halflife, gamma energy per decay, soil-to-plant transfer factor, ...etc

  9. Estimates of Green potentials. Applications

    SciTech Connect (OSTI)

    Danchenko, V I

    2003-02-28

    Optimal Cartan-type covers by hyperbolic discs of carriers of Green {alpha}-potentials are obtained in a simply connected domain in the complex plane and estimates of the potentials outside the carriers are presented. These results are applied to problems on the separation of singularities of analytic and harmonic functions. For instance, uniform and integral estimates in terms of Green capacities of components of meromorphic functions are obtained.

  10. ASCR Science Network Requirements

    SciTech Connect (OSTI)

    Dart, Eli; Tierney, Brian

    2009-08-24

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high

  11. Revenue Requirements Model (RRM) documentation. Final report (Revised)

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The Revenue Requirements Model (RRM) is designed to estimate the impact of various regulatory and economic policy variables on the total revenue requirements of electric utilities. The RRM is built to utilize financial data extracted from the Standard and Poor's (S and P) Compustat II Utility data base (a proprietary data base). The RRM uses a simplified regulatory accounting framework to estimate the cost of service of the electric operations of utilities. The RRM is written in SAS, a proprietary software system. The RRM produces a series of reports including a summary of key data utilized therein, an income statement, revenue requirements, and selected key financial measures. Each report includes estimates for a base case and a hypothetical case. 4 figures, 6 tables.

  12. BGE Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BGE Communications Requirements BGE Communications Requirements Chart of BGE Communications Requirements PDF icon BGE Communications Requirements More Documents & Publications ...

  13. Weldon Spring historical dose estimate

    SciTech Connect (OSTI)

    Meshkov, N.; Benioff, P.; Wang, J.; Yuan, Y.

    1986-07-01

    This study was conducted to determine the estimated radiation doses that individuals in five nearby population groups and the general population in the surrounding area may have received as a consequence of activities at a uranium processing plant in Weldon Spring, Missouri. The study is retrospective and encompasses plant operations (1957-1966), cleanup (1967-1969), and maintenance (1969-1982). The dose estimates for members of the nearby population groups are as follows. Of the three periods considered, the largest doses to the general population in the surrounding area would have occurred during the plant operations period (1957-1966). Dose estimates for the cleanup (1967-1969) and maintenance (1969-1982) periods are negligible in comparison. Based on the monitoring data, if there was a person residing continually in a dwelling 1.2 km (0.75 mi) north of the plant, this person is estimated to have received an average of about 96 mrem/yr (ranging from 50 to 160 mrem/yr) above background during plant operations, whereas the dose to a nearby resident during later years is estimated to have been about 0.4 mrem/yr during cleanup and about 0.2 mrem/yr during the maintenance period. These values may be compared with the background dose in Missouri of 120 mrem/yr.

  14. Preliminary relative permeability estimates of methanehydrate-bearing sand

    SciTech Connect (OSTI)

    Seol, Yongkoo; Kneafsey, Timothy J.; Tomutsa, Liviu; Moridis,George J.

    2006-05-08

    The relative permeability to fluids in hydrate-bearing sediments is an important parameter for predicting natural gas production from gas hydrate reservoirs. We estimated the relative permeability parameters (van Genuchten alpha and m) in a hydrate-bearing sand by means of inverse modeling, which involved matching water saturation predictions with observations from a controlled waterflood experiment. We used x-ray computed tomography (CT) scanning to determine both the porosity and the hydrate and aqueous phase saturation distributions in the samples. X-ray CT images showed that hydrate and aqueous phase saturations are non-uniform, and that water flow focuses in regions of lower hydrate saturation. The relative permeability parameters were estimated at two locations in each sample. Differences between the estimated parameter sets at the two locations were attributed to heterogeneity in the hydrate saturation. Better estimates of the relative permeability parameters require further refinement of the experimental design, and better description of heterogeneity in the numerical inversions.

  15. Quick estimating for thermal conductivity

    SciTech Connect (OSTI)

    Sastri, S.R.S.; Rao, K.K. )

    1993-08-01

    Accurate values for thermal conductivity--an important engineering property used in heat transfer calculations of liquids--are not as readily available as those for other physical properties. Therefore, it often becomes necessary to use estimated data. A new estimating method combines ease of use with an accuracy that is generally better than existing procedures. The paper discusses how to select terms and testing correlations, then gives two examples of the use of the method for calculation of the thermal conductivity of propionic acid and chlorobenzene.

  16. Transportation Infrastructure Requirement Resources | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Find infrastructure requirement resources below. DOE Resource Alternative Fuels Data Center: Natural Gas Fueling Infrastructure Development. Other Resource National Governors ...

  17. Considering Project Requirements and Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Considering the requirements and recommendations of the project is the fourth step in planning for a federal site solar installation.

  18. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  19. Mandatory Photovoltaic System Cost Estimate

    Broader source: Energy.gov [DOE]

    If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, the utility must provide the comparison at no cost. If the...

  20. BLE: Battery Life Estimator | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BLE: Battery Life Estimator BLE: Battery Life Estimator Argonne's Battery Life Estimator (BLE) software is a state-of-the-art tool kit for fitting battery aging data and for ...

  1. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    SciTech Connect (OSTI)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook.

  2. Estimates and Recommendations for Coincidence Geometry (Technical...

    Office of Scientific and Technical Information (OSTI)

    Estimates and Recommendations for Coincidence Geometry Citation Details In-Document Search Title: Estimates and Recommendations for Coincidence Geometry You are accessing a...

  3. Estimating Waste Inventory and Waste Tank Characterization |...

    Office of Environmental Management (EM)

    Estimating Waste Inventory and Waste Tank Characterization Estimating Waste Inventory and Waste Tank Characterization Summary Notes from 28 May 2008 Generic Technical Issue ...

  4. Background estimation in experimental spectra

    SciTech Connect (OSTI)

    Fischer, R.; Hanson, K. M.; Los Alamos National Laboratory, MS P940, Los Alamos, New Mexico 87545 ; Dose, V.; Linden, W. von der

    2000-02-01

    A general probabilistic technique for estimating background contributions to measured spectra is presented. A Bayesian model is used to capture the defining characteristics of the problem, namely, that the background is smoother than the signal. The signal is allowed to have positive and/or negative components. The background is represented in terms of a cubic spline basis. A variable degree of smoothness of the background is attained by allowing the number of knots and the knot positions to be adaptively chosen on the basis of the data. The fully Bayesian approach taken provides a natural way to handle knot adaptivity and allows uncertainties in the background to be estimated. Our technique is demonstrated on a particle induced x-ray emission spectrum from a geological sample and an Auger spectrum from iron, which contains signals with both positive and negative components. (c) 2000 The American Physical Society.

  5. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect (OSTI)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  6. Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regular participation in a student green group may also earn credit. Create a PARC Education & Outreach Video Earn 2 points Work with PARC Multimedia Specialist Dan Allen ...

  7. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  8. Benefits Forms & Required Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits Forms & Required Notices Benefits Forms & Required Notices A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contacts Benefits Office (505) 667-1806 Email Benefits Forms & Required Notices Forms Benefits Enrollment Form, 1751a (pdf) Declaration of Domestic Partnership, 1925a (pdf) Declaration of Legal Ward as Eligible Dependent, 3028 (pdf) Declaration that Enrolled Dependent Meets IRS

  9. Travel Requirements - ITER (June 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Travel Requirements - ITER (June 2014) Prior to any travel under this subcontract, the ... approval, with a copy to the identified US ITER Project Office Travel Administrative ...

  10. Future missions require improving LANSCE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Future missions require improving LANSCE capabilities to support five principal research ... Science Critical to DOE and NNSA Missions for Over 35 Years Hydrodynamics with Proton ...

  11. Federal Requirements for the Web

    Broader source: Energy.gov [DOE]

    Federal laws and requirements govern the Office of Energy Efficiency and Renewable Energy (EERE) with regards to its websites and other digital media.

  12. Animation Requirements for the Web

    Broader source: Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow the Office of Energy Efficiency and Renewable Energy's (EERE's) design and coding requirements.

  13. Data Collection and Normalization for the Development of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost estimating relationships or parametric equations are mathematical statements that indicate that the cost is proportional to a physical commodity. Parametric estimating requires that the statistical analysis be performed on data points to correlate the cost drivers and other system parameters. This chapter discusses considerations for data collection and normalization.

  14. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  15. Feedback techniques and SPS Ecloud instabilities - design estimates

    SciTech Connect (OSTI)

    Fox,J.D.; Mastorides, T.; Ndabashimiye, G.; Rivetta, C.; Van Winkle, D.; Byrd, J.; Vay, J-L.; Hofle, W.; Rumolo, G.; de Maria, R.

    2009-05-04

    The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. While the SPS has a coupled-bunch transverse feedback system, control of Ecloud driven motion requires a much wider control bandwidth capable of sensing and controlling motion within each bunched beam. This paper draws beam dynamics data from the measurements and simulations of this SPS instability, and estimates system requirements for a feedback system with 2-4 GS/sec. sampling rates to damp Ecloud-driven transverse motion in the SPS at intensities desired for high-current LHC operation.

  16. Automotive Turbocharging: Industrial Requirements and Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turbocharging: Industrial Requirements and Technology Developments Automotive Turbocharging: Industrial Requirements and Technology Developments Significant improvements in ...

  17. Chart of communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chart of communications requirements Chart of communications requirements Chart of communications requirements for BGE Chart of communications requirements (109.11 KB) More Documents & Publications BGE Communications Requirements Lower Colorado River Authority Lower Colorado River Authority

  18. Program Evaluation: Minimum EERE Requirements

    Broader source: Energy.gov [DOE]

    The minimum requirements for EERE's in-progress peer reviews are described below. Given the diversity of EERE programs and activities, a great deal of flexibility is provided within these...

  19. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  20. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site map An overview of the available content on this site. Keep the pointer still over an item for a few seconds to get its description. Directives Delegations Other Requirements Top 10 Directives Help Directives Tools RevCom

  1. 4.5 Audit Requirements

    Broader source: Energy.gov (indexed) [DOE]

    ... The named person will be required to have a password and user ID for the secured portion of Clearinghouse database. Passwords and user IDs should be coordinated through the Office ...

  2. Video Requirements for the Web

    Office of Energy Efficiency and Renewable Energy (EERE)

    All Office of Energy Efficiency and Renewable Energy (EERE) videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the U.S. Department of Energy YouTube channel.

  3. 2007 Estimated International Energy Flows

    SciTech Connect (OSTI)

    Smith, C A; Belles, R D; Simon, A J

    2011-03-10

    An energy flow chart or 'atlas' for 136 countries has been constructed from data maintained by the International Energy Agency (IEA) and estimates of energy use patterns for the year 2007. Approximately 490 exajoules (460 quadrillion BTU) of primary energy are used in aggregate by these countries each year. While the basic structure of the energy system is consistent from country to country, patterns of resource use and consumption vary. Energy can be visualized as it flows from resources (i.e. coal, petroleum, natural gas) through transformations such as electricity generation to end uses (i.e. residential, commercial, industrial, transportation). These flow patterns are visualized in this atlas of 136 country-level energy flow charts.

  4. Bayesian estimation methods in metrology

    SciTech Connect (OSTI)

    Cox, M.G.; Forbes, A.B.; Harris, P.M.

    2004-11-16

    In metrology -- the science of measurement -- a measurement result must be accompanied by a statement of its associated uncertainty. The degree of validity of a measurement result is determined by the validity of the uncertainty statement. In recognition of the importance of uncertainty evaluation, the International Standardization Organization in 1995 published the Guide to the Expression of Uncertainty in Measurement and the Guide has been widely adopted. The validity of uncertainty statements is tested in interlaboratory comparisons in which an artefact is measured by a number of laboratories and their measurement results compared. Since the introduction of the Mutual Recognition Arrangement, key comparisons are being undertaken to determine the degree of equivalence of laboratories for particular measurement tasks. In this paper, we discuss the possible development of the Guide to reflect Bayesian approaches and the evaluation of key comparison data using Bayesian estimation methods.

  5. Requirements for GNEP Transmutation Fuels

    SciTech Connect (OSTI)

    D. C. Crawford; M. K. Meyer; S. L. Hayes

    2007-03-01

    The purpose of this document is to provide a baseline set of requirements to guide fuel fabrication development and irradiation testing performed as part of the AFCRD Transmutation Fuel Development Program. This document can be considered a supplement to the GNEP TRU Fuel Development and Qualification Plan, and will be revised as necessary to maintain a documented set of fuel testing objectives and requirements consistent with programmatic decisions and advances in technical knowledge.

  6. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact form Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directives Program Management Emily Stanton, (202) 287-5641 Rachel Mack, (202) 287-6804 Delegation Program Management Gail Cephas,(202) 586-1049 Web Site Administration Technical Support Staff, (505) 663-1302 Fill in this form to contact us. Name Please enter your full name E-Mail (Required) Please enter your

  7. Functional performance requirements for seismic network upgrade

    SciTech Connect (OSTI)

    Lee, R.C.

    1991-08-18

    The SRL seismic network, established in 1976, was developed to monitor site and regional seismic activity that may have any potential to impact the safety or reduce containment capability of existing and planned structures and systems at the SRS, report seismic activity that may be relevant to emergency preparedness, including rapid assessments of earthquake location and magnitude, and estimates of potential on-site and off-site damage to facilities and lifelines for mitigation measures. All of these tasks require SRL seismologists to provide rapid analysis of large amounts of seismic data. The current seismic network upgrade, the subject of this Functional Performance Requirements Document, is necessary to improve system reliability and resolution. The upgrade provides equipment for the analysis of the network seismic data and replacement of old out-dated equipment. The digital network upgrade is configured for field station and laboratory digital processing systems. The upgrade consists of the purchase and installation of seismic sensors,, data telemetry digital upgrades, a dedicated Seismic Data Processing (SDP) system (already in procurement stage), and a Seismic Signal Analysis (SSA) system. The field stations and telephone telemetry upgrades include equipment necessary for three remote station upgrades including seismic amplifiers, voltage controlled oscillators, pulse calibrators, weather protection (including lightning protection) systems, seismometers, seismic amplifiers, and miscellaneous other parts. The central receiving and recording station upgrades will include discriminators, helicopter amplifier, omega timing system, strong motion instruments, wide-band velocity sensors, and other miscellaneous equipment.

  8. Actions taken by DOD on GAO recommendations to improve spare parts requirements determination

    SciTech Connect (OSTI)

    Not Available

    1985-04-30

    GAO found that actions taken by the military services and DOD to improve the spare parts requirements determination process, in response to prior GAO report recommendations, have resulted in estimated cost savings of over $800 million during the past 5 years. Additional actions in process should result in further estimated savings of over $500 million.

  9. State Energy Price and Expenditure Estimates

    Reports and Publications (EIA)

    2016-01-01

    Energy price and expenditure estimates in dollars per million Btu and in million dollars, by state, 1970-2014.

  10. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  11. New Methodology for Natural Gas Production Estimates

    Reports and Publications (EIA)

    2010-01-01

    A new methodology is implemented with the monthly natural gas production estimates from the EIA-914 survey this month. The estimates, to be released April 29, 2010, include revisions for all of 2009. The fundamental changes in the new process include the timeliness of the historical data used for estimation and the frequency of sample updates, both of which are improved.

  12. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HEP/NP Requirements Review 2013 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 HEP Attendees 2013 FES Requirements Review 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  13. Triggering requirements for SSC physics

    SciTech Connect (OSTI)

    Gilchriese, M.G.D.

    1989-04-01

    Some aspects of triggering requirements for high P{sub T} physics processes at the Superconducting Super Collider (SSC) are described. A very wide range of trigger types will be required to enable detection of the large number of potential physics signatures possible at the SSC. Although in many cases trigger rates are not now well understood, it is possible to conclude that the ability to trigger on transverse energy, number and energy of jets, number and energy of leptons (electrons and muons), missing energy and combinations of these will be required. An SSC trigger system must be both highly flexible and redundant to ensure reliable detection of many new physics processes at the SSC.

  14. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  15. Directives Requiring Additional Documentation - DOE Directives,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Delegations, and Requirements Requiring Additional Documentation by Website Administrator PDF document icon DirectivesRequiringAdditionalDocumentation (1).pdf - PDF document, 35 KB (36219

  16. Digital Data Management Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Digital Data Management Requirements To integrate data management planning into an overall research plan, the following requirements will apply to all Office of Energy ...

  17. Buddy Tag CONOPS and Requirements.

    SciTech Connect (OSTI)

    Brotz, Jay Kristoffer; Deland, Sharon M.

    2015-12-01

    This document defines the concept of operations (CONOPS) and the requirements for the Buddy Tag, which is conceived and designed in collaboration between Sandia National Laboratories and Princeton University under the Department of State Key VerificationAssets Fund. The CONOPS describe how the tags are used to support verification of treaty limitations and is only defined to the extent necessary to support a tag design. The requirements define the necessary functions and desired non-functional features of the Buddy Tag at a high level

  18. Johnson Noise Thermometry System Requirements

    SciTech Connect (OSTI)

    Britton Jr, Charles L; Roberts, Michael; Ezell, N Dianne Bull; Qualls, A L; Holcomb, David Eugene

    2013-01-01

    This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

  19. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  20. Microsoft Word - S07566_Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  1. Robust Bearing Estimation for 3-Component Stations

    SciTech Connect (OSTI)

    Claassen, John P.

    1999-06-03

    A robust bearing estimation process for 3-component stations has been developed and explored. The method, called SEEC for Search, Estimate, Evaluate and Correct, intelligently exploits the in- herent information in the arrival at every step of the process to achieve near-optimal results. In particular, the approach uses a consistent framework to define the optimal time-frequency windows on which to make estimates, to make the bearing estimates themselves, to construct metrics helpful in choosing the better estimates or admitting that the bearing is immeasurable, andjinally to apply bias corrections when calibration information is available to yield a single final estimate. The method was applied to a small but challenging set of events in a seismically active region. The method demonstrated remarkable utility by providing better estimates and insights than previously available. Various monitoring implications are noted fiom these findings.

  2. Robust bearing estimation for 3-component stations

    SciTech Connect (OSTI)

    CLAASSEN,JOHN P.

    2000-02-01

    A robust bearing estimation process for 3-component stations has been developed and explored. The method, called SEEC for Search, Estimate, Evaluate and Correct, intelligently exploits the inherent information in the arrival at every step of the process to achieve near-optimal results. In particular the approach uses a consistent framework to define the optimal time-frequency windows on which to make estimates, to make the bearing estimates themselves, to construct metrics helpful in choosing the better estimates or admitting that the bearing is immeasurable, and finally to apply bias corrections when calibration information is available to yield a single final estimate. The algorithm was applied to a small but challenging set of events in a seismically active region. It demonstrated remarkable utility by providing better estimates and insights than previously available. Various monitoring implications are noted from these findings.

  3. Audio Requirements for the Web

    Broader source: Energy.gov [DOE]

    Audio-only files—whether they are downloaded from a page or distributed via a podcast—must be accessible to all visitors of the Office of Energy Efficiency and Renewable Energy (EERE) website. For developing and posting audio-only files, follow these requirements and best practices.

  4. Reliability Estimates for Power Supplies

    SciTech Connect (OSTI)

    Lee C. Cadwallader; Peter I. Petersen

    2005-09-01

    Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

  5. UCNI Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UCNI Review Requirement UCNI Review Requirement What are the requirements for reviewing a document that may contain UCNI? 1017.15(a) requires you to have a document that may ...

  6. Capabilities required to conduct the LLNL plutonium mission

    SciTech Connect (OSTI)

    Kass, J.; Bish, W.; Copeland, A.; West, J.; Sack, S.; Myers, B.

    1991-09-10

    This report outlines the LLNL plutonium related mission anticipated over the next decade and defines the capabilities required to meet that mission wherever the Plutonium Facility is located. If plutonium work is relocated to a place where the facility is shared, then some capabilities can be commonly used by the sharing parties. However, it is essential that LLNL independently control about 20000 sq ft of net lab space, filled with LLNL controlled equipment, and staffed by LLNL employees. It is estimated that the cost to construct this facility should range from $140M to $200M. Purchase and installation of equipment to replace that already in Bldg 332 along with additional equipment identified as being needed to meet the mission for the next ten to fifteen years, is estimated to cost $118M. About $29M of the equipment could be shared. The Hardened Engineering Test Building (HETB) with its additional 8000 sq ft of unique test capability must also be replaced. The fully equipped replacement cost is estimated to be about $10M. About 40000 sq ft of setup and support space are needed along with office and related facilities for a 130 person resident staff. The setup space is estimated to cost $8M. The annual cost of a 130 person resident staff (100 programmatic and 30 facility operation) is estimated to be $20M.

  7. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  8. Updated Reporting Requirement Checklists and Research Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy ...

  9. Parameter Estimation for Single Diode Models of Photovoltaic Modules

    SciTech Connect (OSTI)

    Hansen, Clifford

    2015-03-01

    Many popular models for photovoltaic system performance employ a single diode model to compute the I - V curve for a module or string of modules at given irradiance and temperature conditions. A single diode model requires a number of parameters to be estimated from measured I - V curves. Many available parameter estimation methods use only short circuit, o pen circuit and maximum power points for a single I - V curve at standard test conditions together with temperature coefficients determined separately for individual cells. In contrast, module testing frequently records I - V curves over a wide range of irradi ance and temperature conditions which, when available , should also be used to parameterize the performance model. We present a parameter estimation method that makes use of a fu ll range of available I - V curves. We verify the accuracy of the method by recov ering known parameter values from simulated I - V curves . We validate the method by estimating model parameters for a module using outdoor test data and predicting the outdoor performance of the module.

  10. Estimating vehicle roadside encroachment frequency using accident prediction models

    SciTech Connect (OSTI)

    Miaou, S.-P.

    1996-07-01

    The existing data to support the development of roadside encroachment- based accident models are extremely limited and largely outdated. Under the sponsorship of the Federal Highway Administration and Transportation Research Board, several roadside safety projects have attempted to address this issue by providing rather comprehensive data collection plans and conducting pilot data collection efforts. It is clear from the results of these studies that the required field data collection efforts will be expensive. Furthermore, the validity of any field collected encroachment data may be questionable because of the technical difficulty to distinguish intentional from unintentional encroachments. This paper proposes an alternative method for estimating the basic roadside encroachment data without actually field collecting them. The method is developed by exploring the probabilistic relationships between a roadside encroachment event and a run-off-the-road event With some mild assumptions, the method is capable of providing a wide range of basic encroachment data from conventional accident prediction models. To illustrate the concept and use of such a method, some basic encroachment data are estimated for rural two-lane undivided roads. In addition, the estimated encroachment data are compared with the existing collected data. The illustration shows that the method described in this paper can be a viable approach to estimating basic encroachment data without actually collecting them which can be very costly.

  11. Notes on a New Coherence Estimator

    SciTech Connect (OSTI)

    Bickel, Douglas L.

    2016-01-01

    This document discusses some interesting features of the new coherence estimator in [1] . The estimator is d erived from a slightly different viewpoint. We discuss a few properties of the estimator, including presenting the probability density function of the denominator of the new estimator , which is a new feature of this estimator . Finally, we present an appr oximate equation for analysis of the sensitivity of the estimator to the knowledge of the noise value. ACKNOWLEDGEMENTS The preparation of this report is the result of an unfunded research and development activity. Sandia National Laboratories is a multi - program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE - AC04 - 94AL85000.

  12. Lattice QCD and NERSC requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    QCD and NERSC requirements Rich Brower, Steven Gottlieb and Doug Toussaint November 26, 2012 Rich Brower, Steven Gottlieb and Doug Toussaint () Lattice QCD at NERSC November 26, 2012 1 / 17 Lattice Gauge Theory at NERSC First-principles computations in QCD Computations in other strongly coupled field theories Find hadronic factors to get fundamental physics from experiments Understand structure and interactions of hadrons Understand QCD: confinement and chiral symmetry breaking Other strongly

  13. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Website Administrator The DOE Directives, Regulations, and Requirements Portal is operated by Doxcelerate Corporation for the Office of Information Resources (MA-90). Location: Santa Fe, NM, USA Author's external home page... Select a document from the list below to leave feedback for the writer. For contact information, use the DOE Phonebook. Latest content created by this user May 22, 2015 Recently Approved Justification Memoranda May 20, 2015 DRAFT - DOE O 331.1D, Employee Performance and

  14. DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    www.directives.doe.gov Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. New - DOE O 430.1C, Real Property Asset Management https://www.directives.doe.gov/news/0430.1C-new The directive establishes an integrated corporate-level, performance based approach to the life-cycle management of our real property assets. It links real property asset planning, programming, budgeting

  15. Present and Future Computing Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical

  16. Estimating the releasable source term for Type B packages

    SciTech Connect (OSTI)

    Anderson, B.L.; Carlson, R.W.; Osgood, N.

    1995-11-01

    The release rate criteria for Type B packages designed to transport radioactive materials is given in Title 10 of the Code of Federal Regulations (10 CFR 71). Before the maximum allowable volumetric leakage rate that corresponds to the regulatory release rate can be calculated, estimation of the releasable source term activity density (concentration of releasable radioactive material) is required. This work provides methods for estimating the releasable source term for packages holding various contents types. The contents types considered include: (1) radioactive liquids; (2) radioactive gases; (3) radioactive powders and dispersible solids; (4) non-dispersible radioactive solids and (5) irradiated nuclear fuel rods. The numbers given, especially as related to the source term for packages transporting irradiated fuel rods, are preliminary and are subject to change upon development of improved methods and/or upon review of additional experimental data.

  17. RSMASS: A simple model for estimating reactor and shield masses

    SciTech Connect (OSTI)

    Marshall, A.C.; Aragon, J.; Gallup, D.

    1987-01-01

    A simple mathematical model (RSMASS) has been developed to provide rapid estimates of reactor and shield masses for space-based reactor power systems. Approximations are used rather than correlations or detailed calculations to estimate the reactor fuel mass and the masses of the moderator, structure, reflector, pressure vessel, miscellaneous components, and the reactor shield. The fuel mass is determined either by neutronics limits, thermal/hydraulic limits, or fuel damage limits, whichever yields the largest mass. RSMASS requires the reactor power and energy, 24 reactor parameters, and 20 shield parameters to be specified. This parametric approach should be applicable to a very broad range of reactor types. Reactor and shield masses calculated by RSMASS were found to be in good agreement with the masses obtained from detailed calculations.

  18. State energy data report 1994: Consumption estimates

    SciTech Connect (OSTI)

    1996-10-01

    This document provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), operated by EIA. SEDS provides State energy consumption estimates to members of Congress, Federal and State agencies, and the general public, and provides the historical series needed for EIA`s energy models. Division is made for each energy type and end use sector. Nuclear electric power is included.

  19. U.S. Uranium Reserves Estimates

    Gasoline and Diesel Fuel Update (EIA)

    Methodology The U.S. uranium ore reserves reported by EIA for specific MFC categories represent the sums of quantities estimated to occur in known deposits on properties where data about the ore grade, configuration, and depth indicate that the quantities estimated could be recovered at or less than the stated costs given current mining and milling technology and regulations. The reserves estimates for year-end (delete: December 31, 2008), are based on historical data for uranium properties

  20. Methodology for Monthly Crude Oil Production Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    015 U.S. Energy Information Administration | Methodology for Monthly Crude Oil Production Estimates 1 Methodology for Monthly Crude Oil Production Estimates Executive summary The U.S. Energy Information Administration (EIA) relies on data from state and other federal agencies and does not currently collect survey data directly from crude oil producers. Summarizing the estimation process in terms of percent of U.S. production: * 20% is based on state agency data, including North Dakota and

  1. ORISE: Radiation Dose Estimates and Other Compendia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rapidly estimate internal and external radiation dose magnitudes that can be used to help ... (PDF) Health Concerns Related to Radiation Exposure of the Female Nuclear Medicine ...

  2. Structure Learning and Statistical Estimation in Distribution...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Structure Learning and Statistical Estimation ... Part I of this paper discusses the problem of learning the operational structure of the ...

  3. Adjusted Estimates of Texas Natural Gas Production

    Reports and Publications (EIA)

    2005-01-01

    The Energy Information Administration (EIA) is adjusting its estimates of natural gas production in Texas for 2004 and 2005 to correctly account for carbon dioxide (CO2) production.

  4. Interruption Cost Estimate Calculator | Open Energy Information

    Open Energy Info (EERE)

    Cost Estimate (ICE) Calculator This calculator is a tool designed for electric reliability planners at utilities, government organizations or other entities that are...

  5. How EIA Estimates Natural Gas Production

    Reports and Publications (EIA)

    2004-01-01

    The Energy Information Administration (EIA) publishes estimates monthly and annually of the production of natural gas in the United States. The estimates are based on data EIA collects from gas producing states and data collected by the U. S. Minerals Management Service (MMS) in the Department of Interior. The states and MMS collect this information from producers of natural gas for various reasons, most often for revenue purposes. Because the information is not sufficiently complete or timely for inclusion in EIA's Natural Gas Monthly (NGM), EIA has developed estimation methodologies to generate monthly production estimates that are described in this document.

  6. Guidelines for Estimating Unmetered Industrial Water Use

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines for Estimating Unmetered Industrial Water Use Prepared for U.S. Department of ... PNNL would like to thank the Federal Water Working Group of the Interagency Energy ...

  7. An Estimator of Propagation of Cascading Failure

    SciTech Connect (OSTI)

    Dobson, Ian; Wierzbicki, Kevin; Carreras, Benjamin A; Lynch, Vickie E; Newman, David E

    2006-01-01

    The authors suggest a statistical estimator to measure the extent to which failures propagate in cascading failures such as large blackouts.

  8. Property:Estimated End Date | Open Energy Information

    Open Energy Info (EERE)

    Estimated End Date Jump to: navigation, search Property Name Estimated End Date Property Type String Pages using the property "Estimated End Date" Showing 4 pages using this...

  9. Guidance on Utility Rate Estimations and Weather Normalization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Rate Estimations and Weather Normalization in an ESPC Guidance on Utility Rate Estimations and Weather Normalization in an ESPC Document explains how to use estimated ...

  10. Cost and Schedule Estimate and Analysis (FPM 207), Amarillo ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Course topics include: identifying cost and schedule estimates; Basic estimating methods; Group analysis techniques; Applying life-cycle costing technique; Validating estimates; ...

  11. New York Dry Natural Gas Reserves Estimated Production (Billion...

    Gasoline and Diesel Fuel Update (EIA)

    Estimated Production (Billion Cubic Feet) New York Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production New York Dry Natural Gas Proved Reserves Dry ...

  12. New Mexico Dry Natural Gas Reserves Estimated Production (Billion...

    Gasoline and Diesel Fuel Update (EIA)

    Estimated Production (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production New Mexico Dry Natural Gas Proved Reserves ...

  13. Request for Retirement Annuity Estimates | Department of Energy

    Office of Environmental Management (EM)

    Request for Retirement Annuity Estimates Request for Retirement Annuity Estimates Upon request, Office of the Chief Human Capital Officer provides retirement estimates for ...

  14. West Virginia Dry Natural Gas Reserves Estimated Production ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Estimated Production (Billion Cubic Feet) West Virginia Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production West Virginia Dry Natural Gas Proved ...

  15. Virginia Dry Natural Gas Reserves Estimated Production (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Estimated Production (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production Virginia Dry Natural Gas Proved Reserves Dry ...

  16. North Dakota Dry Natural Gas Reserves Estimated Production (Billion...

    U.S. Energy Information Administration (EIA) Indexed Site

    Estimated Production (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Estimated ... Dry Natural Gas Reserves Estimated Production North Dakota Dry Natural Gas Proved Reserves ...

  17. Power, Optimization, Waste Estimating, Resourcing Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    Planning, Optimization, Waste Estimating, Resourcing tool (POWERtool) is a comprehensive relational database software tool that can be used to develop and organize a detailed project scope, plan work tasks, develop bottoms-up field cost and waste estimates for facility Deactivation and Decommissioning (D&D), equipment, and environmental restoration (ER) projects and produces resource-loaded schedules.

  18. Systematic Approach for Decommissioning Planning and Estimating

    SciTech Connect (OSTI)

    Dam, A. S.

    2002-02-26

    Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facility knowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises.

  19. Estimating pressurized water reactor decommissioning costs: A user`s manual for the PWR Cost Estimating Computer Program (CECP) software. Draft report for comment

    SciTech Connect (OSTI)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  20. Estimating boiling water reactor decommissioning costs: A user`s manual for the BWR Cost Estimating Computer Program (CECP) software. Final report

    SciTech Connect (OSTI)

    Bierschbach, M.C.

    1996-06-01

    Nuclear power plant licensees are required to submit to the US Nuclear Regulatory Commission (NRC) for review their decommissioning cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning boiling water reactor (BWR) power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  1. Estimating boiling water reactor decommissioning costs. A user`s manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    SciTech Connect (OSTI)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  2. Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries

    SciTech Connect (OSTI)

    Belzer, D.B. ); Serot, D.E. ); Kellogg, M.A. )

    1991-03-01

    Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner that allows evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study, conducted by Pacific Northwest Laboratory (PNL), developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key non-manufacturing sectors. This volume presents tabular and graphical results of the historical analysis and projections for each SIC industry. (JF)

  3. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly ...

  4. Government Printing Office Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Printing Office Requirements Government Printing Office Requirements This section describes the Government Printing Office (GPO) requirements for all print materials, whether printed electronically or on paper. This includes requirements for printing and copying for all EERE publications. Approved Printers Executive Order 12873, signed by President Clinton, requires that all government offices and their contractors are required to use GPO-approved printers to print and copy all

  5. Network Requirements Workshop - Documents and Background Materials

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » Documents and Background Materials Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR

  6. Genome informatics: Requirements and challenges

    SciTech Connect (OSTI)

    Robbins, R.J.

    1993-12-31

    Informatics of some kind will play a role in every aspect of the Human Genome Project (HGP); data acquisition, data analysis, data exchange, data publication, and data visualization. What are the real requirements and challenges? The primary requirement is clear thinking and the main challenge is design. If good design is lacking, the price will be failure of genome informatics and ultimately failure of the genome project itself. Scientists need good designs to deliver the tools necessary for acquiring and analyzing DNA sequences. As these tools become more efficient, they will need new tools for comparative genomic analyses. To make the tools work, the scientists will need to address and solve nomenclature issues that are essential, if also tedious. They must devise systems that will scale gracefully with the increasing flow of data. The scientists must be able to move data easily from one system to another, with no loss of content. As scientists, they will have failed in their responsibility to share results, should repeating experiments ever become preferable to searching the literature. Their databases must become a new kind of scientific literature and the scientists must develop ways to make electronic data publishing as routine as traditional journal publishing. Ultimately, they must build systems so advanced that they are virtually invisible. In summary, the HGP can be considered the most ambitious, most audacious information-management project ever undertaken. In the HGP, computers will not merely serve as tools for cataloging existing knowledge. Rather, they will serve as instruments, helping to create new knowledge by changing the way the scientists see the biological world. Computers will allow them to see genomes, just as radio telescopes let them see quasars and electron microscopes let them see viruses.

  7. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    SciTech Connect (OSTI)

    Melaina, M.; Penev, M.

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  8. Cold vacuum drying facility design requirements

    SciTech Connect (OSTI)

    IRWIN, J.J.

    1999-07-01

    This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

  9. Requirements Based Surveillance and Maintenance Review Process...

    Energy Savers [EERE]

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  10. Improving CSE Software through Reproducibility Requirements....

    Office of Scientific and Technical Information (OSTI)

    Improving CSE Software through Reproducibility Requirements. Citation Details In-Document Search Title: Improving CSE Software through Reproducibility Requirements. Abstract not ...

  11. California Waste Discharge Requirements Website | Open Energy...

    Open Energy Info (EERE)

    Requirements Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California Waste Discharge Requirements Website Abstract This website contains...

  12. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised,...

  13. Civilian Radioactive Waste Management System Requirements Document...

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level ...

  14. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    O 420.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised, ...

  15. Requirements for Bridge Inspection | Department of Energy

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National...

  16. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  17. Web Writing Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Web Writing Requirements When writing content for Office of Energy Efficiency and Renewable Energy (EERE) websites and applications, follow these requirements. Also see EERE's Web ...

  18. Uncertainty Estimation Improves Energy Measurement and Verification Procedures

    SciTech Connect (OSTI)

    Walter, Travis; Price, Phillip N.; Sohn, Michael D.

    2014-05-14

    Implementing energy conservation measures in buildings can reduce energy costs and environmental impacts, but such measures cost money to implement so intelligent investment strategies require the ability to quantify the energy savings by comparing actual energy used to how much energy would have been used in absence of the conservation measures (known as the baseline energy use). Methods exist for predicting baseline energy use, but a limitation of most statistical methods reported in the literature is inadequate quantification of the uncertainty in baseline energy use predictions. However, estimation of uncertainty is essential for weighing the risks of investing in retrofits. Most commercial buildings have, or soon will have, electricity meters capable of providing data at short time intervals. These data provide new opportunities to quantify uncertainty in baseline predictions, and to do so after shorter measurement durations than are traditionally used. In this paper, we show that uncertainty estimation provides greater measurement and verification (M&V) information and helps to overcome some of the difficulties with deciding how much data is needed to develop baseline models and to confirm energy savings. We also show that cross-validation is an effective method for computing uncertainty. In so doing, we extend a simple regression-based method of predicting energy use using short-interval meter data. We demonstrate the methods by predicting energy use in 17 real commercial buildings. We discuss the benefits of uncertainty estimates which can provide actionable decision making information for investing in energy conservation measures.

  19. Parallel State Estimation Assessment with Practical Data

    SciTech Connect (OSTI)

    Chen, Yousu; Jin, Shuangshuang; Rice, Mark J.; Huang, Zhenyu

    2014-10-31

    This paper presents a full-cycle parallel state estimation (PSE) implementation using a preconditioned conjugate gradient algorithm. The developed code is able to solve large-size power system state estimation within 5 seconds using real-world data, comparable to the Supervisory Control And Data Acquisition (SCADA) rate. This achievement allows the operators to know the system status much faster to help improve grid reliability. Case study results of the Bonneville Power Administration (BPA) system with real measurements are presented. The benefits of fast state estimation are also discussed.

  20. State Energy Data Report, 1991: Consumption estimates

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining SEDS is to create historical time series of energy consumption by State that are defined as consistently as possible over time and across sectors. SEDS exists for two principal reasons: (1) to provide State energy consumption estimates to the Government, policy makers, and the public; and (2) to provide the historical series necessary for EIA`s energy models.

  1. State energy data report 1993: Consumption estimates

    SciTech Connect (OSTI)

    1995-07-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sector. The estimates are developed in the State Energy Data System (SEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining SEDS is to create historical time series of energy consumption by State that are defined as consistently as possible over time and across sectors. SEDS exists for two principal reasons: (1) to provide State energy consumption estimates to Members of Congress, Federal and State agencies, and the general public; and (2) to provide the historical series necessary for EIA`s energy models.

  2. State energy data report 1995 - consumption estimates

    SciTech Connect (OSTI)

    1997-12-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sectors. The estimates are developed in the State Energy Data System (SEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining SEDS exists for two principal reasons: (1) to provide State energy consumption estimates to Members of Congress, Federal and State agencies, and the general public, and (2) to provide the historical series necessary for EIA`s energy models.

  3. Estimating Fuel Cycle Externalities: Analytical Methods and Issues, Report 2

    SciTech Connect (OSTI)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1994-07-01

    The activities that produce electric power typically range from extracting and transporting a fuel, to its conversion into electric power, and finally to the disposition of residual by-products. This chain of activities is called a fuel cycle. A fuel cycle has emissions and other effects that result in unintended consequences. When these consequences affect third parties (i.e., those other than the producers and consumers of the fuel-cycle activity) in a way that is not reflected in the price of electricity, they are termed ''hidden'' social costs or externalities. They are the economic value of environmental, health and any other impacts, that the price of electricity does not reflect. How do you estimate the externalities of fuel cycles? Our previous report describes a methodological framework for doing so--called the damage function approach. This approach consists of five steps: (1) characterize the most important fuel cycle activities and their discharges, where importance is based on the expected magnitude of their externalities, (2) estimate the changes in pollutant concentrations or other effects of those activities, by modeling the dispersion and transformation of each pollutant, (3) calculate the impacts on ecosystems, human health, and any other resources of value (such as man-made structures), (4) translate the estimates of impacts into economic terms to estimate damages and benefits, and (5) assess the extent to which these damages and benefits are externalities, not reflected in the price of electricity. Each step requires a different set of equations, models and analysis. Analysts generally believe this to be the best approach for estimating externalities, but it has hardly been used! The reason is that it requires considerable analysis and calculation, and to this point in time, the necessary equations and models have not been assembled. Equally important, the process of identifying and estimating externalities leads to a number of complex issues

  4. Budget estimates, fiscal year 1997. Volume 12

    SciTech Connect (OSTI)

    1996-03-01

    This report contains the fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1997.

  5. Buildings GHG Mitigation Estimator Worksheet, Version 1

    Broader source: Energy.gov [DOE]

    Xcel document describes Version 1 of the the Buildings GHG Mitigation Estimator tool. This tool assists federal agencies in estimating the greenhouse gas mitigation reduction from implementing energy efficiency measures across a portfolio of buildings. It is designed to be applied to groups of office buildings, for example, at a program level (regional or site) that can be summarized at the agency level. While the default savings and cost estimates apply to office buildings, users can define their own efficiency measures, costs, and savings estimates for inclusion in the portfolio assessment. More information on user-defined measures can be found in Step 2 of the buildings emission reduction guidance. The output of this tool is a prioritized set of activities that can help the agency to achieve its greenhouse gas reduction targets most cost-effectively.

  6. Hydrogen Production Cost Estimate Using Biomass Gasification...

    Broader source: Energy.gov (indexed) [DOE]

    potential of Hydrogen Production Cost Estimate Using Biomass Gasification The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via ...

  7. Preliminary CBECS End-Use Estimates

    U.S. Energy Information Administration (EIA) Indexed Site

    For the past three CBECS (1989, 1992, and 1995), we used a statistically-adjusted engineering (SAE) methodology to estimate end-use consumption. The core of the SAE methodology...

  8. Estimating Temperature Distributions In Geothermal Areas Using...

    Open Energy Info (EERE)

    "education level" (which depends on the amount and structure of information used for teaching) and (b) the distance of the point at which the estimate is made from the area for...

  9. A simple method to estimate interwell autocorrelation

    SciTech Connect (OSTI)

    Pizarro, J.O.S.; Lake, L.W.

    1997-08-01

    The estimation of autocorrelation in the lateral or interwell direction is important when performing reservoir characterization studies using stochastic modeling. This paper presents a new method to estimate the interwell autocorrelation based on parameters, such as the vertical range and the variance, that can be estimated with commonly available data. We used synthetic fields that were generated from stochastic simulations to provide data to construct the estimation charts. These charts relate the ratio of areal to vertical variance and the autocorrelation range (expressed variously) in two directions. Three different semivariogram models were considered: spherical, exponential and truncated fractal. The overall procedure is demonstrated using field data. We find that the approach gives the most self-consistent results when it is applied to previously identified facies. Moreover, the autocorrelation trends follow the depositional pattern of the reservoir, which gives confidence in the validity of the approach.

  10. WEATHER PREDICTIONS AND SURFACE RADIATION ESTIMATES

    Office of Legacy Management (LM)

    RADIATION ESTIMATES for the RULISON EVENT Final Report Albert H . S t o u t , Ray E . ... f i c e U . ' S . Atomic Energy Commission January 1970 LEGAL NOTSCCE ; L *U . . . . . - . ...

  11. Estimating electron drift velocities in magnetron discharges...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Estimating ... OSTI Identifier: 1172974 Report Number(s): LBNL-5865E DOE Contract Number: DE-AC02-05CH11231 Resource Type: Journal ...

  12. Estimates of US biomass energy consumption 1992

    SciTech Connect (OSTI)

    Not Available

    1994-05-06

    This report is the seventh in a series of publications developed by the Energy Information Administration (EIA) to quantify the biomass-derived primary energy used by the US economy. It presents estimates of 1991 and 1992 consumption. The objective of this report is to provide updated estimates of biomass energy consumption for use by Congress, Federal and State agencies, biomass producers and end-use sectors, and the public at large.

  13. Chapter 3: FY 2005 benefits estimates

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The Office of Energy Efficiency and Renewable Energy (EERE) estimates expected benefits for its overall portfolio and for each of its 11 programs. Benefits for the FY 2005 budget request are estimated for the midterm (2010-2025) and long term (2030-2050). Two separate models suited to these periods are employed—NEMS-GPRA05 for the midterm and MARKAL-GPRA05 for the long term.

  14. Guidelines for Estimating Unmetered Industrial Water Use

    SciTech Connect (OSTI)

    Boyd, Brian K.

    2010-08-01

    The document provides a methodology to estimate unmetered industrial water use for evaporative cooling systems, steam generating boiler systems, batch process applications, and wash systems. For each category standard mathematical relationships are summarized and provided in a single resource to assist Federal agencies in developing an initial estimate of their industrial water use. The approach incorporates industry norms, general rules of thumb, and industry survey information to provide methodologies for each section.

  15. Chapter 3: FY 2006 benefits estimates

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    The Office of Energy Efficiency and Renewable Energy (EERE) estimates expected benefits for its overall portfolio and for each of its 11 programs. Benefits for the FY 2006 budget request are estimated for the midterm (2010-2025) and long term (2030-2050). Two separate models suited to these periods are employed–NEMS-GPRA06 for the midterm and MARKAL-GPRA06 for the long term.

  16. Grantee Checklist for the Inspection & Monitoring Requirement

    Broader source: Energy.gov [DOE]

    This document walks Grantees through the Inspection and Monitoring requirement of the Quality Work Plan.

  17. Estimated recharge rates at the Hanford Site

    SciTech Connect (OSTI)

    Fayer, M.J.; Walters, T.B.

    1995-02-01

    The Ground-Water Surveillance Project monitors the distribution of contaminants in ground water at the Hanford Site for the U.S. Department of Energy. A subtask called {open_quotes}Water Budget at Hanford{close_quotes} was initiated in FY 1994. The objective of this subtask was to produce a defensible map of estimated recharge rates across the Hanford Site. Methods that have been used to estimate recharge rates at the Hanford Site include measurements (of drainage, water contents, and tracers) and computer modeling. For the simulations of 12 soil-vegetation combinations, the annual rates varied from 0.05 mm/yr for the Ephrata sandy loam with bunchgrass to 85.2 mm/yr for the same soil without vegetation. Water content data from the Grass Site in the 300 Area indicated that annual rates varied from 3.0 to 143.5 mm/yr during an 8-year period. The annual volume of estimated recharge was calculated to be 8.47 {times} 10{sup 9} L for the potential future Hanford Site (i.e., the portion of the current Site bounded by Highway 240 and the Columbia River). This total volume is similar to earlier estimates of natural recharge and is 2 to 10x higher than estimates of runoff and ground-water flow from higher elevations. Not only is the volume of natural recharge significant in comparison to other ground-water inputs, the distribution of estimated recharge is highly skewed to the disturbed sandy soils (i.e., the 200 Areas, where most contaminants originate). The lack of good estimates of the means and variances of the supporting data (i.e., the soil map, the vegetation/land use map, the model parameters) translates into large uncertainties in the recharge estimates. When combined, the significant quantity of estimated recharge, its high sensitivity to disturbance, and the unquantified uncertainty of the data and model parameters suggest that the defensibility of the recharge estimates should be improved.

  18. Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America

    SciTech Connect (OSTI)

    Prasad, Rajiv; Hibler, Lyle F.; Coleman, Andre M.; Ward, Duane L.

    2011-11-01

    The purpose of this document is to describe approaches and methods for estimation of the design-basis flood at nuclear power plant sites. Chapter 1 defines the design-basis flood and lists the U.S. Nuclear Regulatory Commission's (NRC) regulations that require estimation of the design-basis flood. For comparison, the design-basis flood estimation methods used by other Federal agencies are also described. A brief discussion of the recommendations of the International Atomic Energy Agency for estimation of the design-basis floods in its member States is also included.

  19. Discretization error estimation and exact solution generation using the method of nearby problems.

    SciTech Connect (OSTI)

    Sinclair, Andrew J.; Raju, Anil; Kurzen, Matthew J.; Roy, Christopher John; Phillips, Tyrone S.

    2011-10-01

    The Method of Nearby Problems (MNP), a form of defect correction, is examined as a method for generating exact solutions to partial differential equations and as a discretization error estimator. For generating exact solutions, four-dimensional spline fitting procedures were developed and implemented into a MATLAB code for generating spline fits on structured domains with arbitrary levels of continuity between spline zones. For discretization error estimation, MNP/defect correction only requires a single additional numerical solution on the same grid (as compared to Richardson extrapolation which requires additional numerical solutions on systematically-refined grids). When used for error estimation, it was found that continuity between spline zones was not required. A number of cases were examined including 1D and 2D Burgers equation, the 2D compressible Euler equations, and the 2D incompressible Navier-Stokes equations. The discretization error estimation results compared favorably to Richardson extrapolation and had the advantage of only requiring a single grid to be generated.

  20. GAO Cost Estimating and Assessment Guide | Department of Energy

    Energy Savers [EERE]

    Cost Estimating and Assessment Guide GAO Cost Estimating and Assessment Guide GAO Cost Estimating and Assessment Guide: Twelve Steps of a High-Quality Cost Estimating Process, from the first step of defining the estimate's purpose to the last step of updating the estimate to reflect actual costs and changes. Twelve Steps of a High-Quality Cost Estimating Process (75.75 KB) Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications

  1. Guidelines for Estimating Unmetered Landscapting Water Use

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on water requirements rather than performing a web search. ... Once you enter this website, switch the ... (See more details on these terms and methodology in the ...

  2. Building unbiased estimators from non-gaussian likelihoods with application to shear estimation

    SciTech Connect (OSTI)

    Madhavacheril, Mathew S.; McDonald, Patrick; Sehgal, Neelima; Slosar, Anze

    2015-01-15

    We develop a general framework for generating estimators of a given quantity which are unbiased to a given order in the difference between the true value of the underlying quantity and the fiducial position in theory space around which we expand the likelihood. We apply this formalism to rederive the optimal quadratic estimator and show how the replacement of the second derivative matrix with the Fisher matrix is a generic way of creating an unbiased estimator (assuming choice of the fiducial model is independent of data). Next we apply the approach to estimation of shear lensing, closely following the work of Bernstein and Armstrong (2014). Our first order estimator reduces to their estimator in the limit of zero shear, but it also naturally allows for the case of non-constant shear and the easy calculation of correlation functions or power spectra using standard methods. Both our first-order estimator and Bernstein and Armstrongs estimator exhibit a bias which is quadratic in true shear. Our third-order estimator is, at least in the realm of the toy problem of Bernstein and Armstrong, unbiased to 0.1% in relative shear errors ?g/g for shears up to |g| = 0.2.

  3. Building unbiased estimators from non-gaussian likelihoods with application to shear estimation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Madhavacheril, Mathew S.; McDonald, Patrick; Sehgal, Neelima; Slosar, Anze

    2015-01-15

    We develop a general framework for generating estimators of a given quantity which are unbiased to a given order in the difference between the true value of the underlying quantity and the fiducial position in theory space around which we expand the likelihood. We apply this formalism to rederive the optimal quadratic estimator and show how the replacement of the second derivative matrix with the Fisher matrix is a generic way of creating an unbiased estimator (assuming choice of the fiducial model is independent of data). Next we apply the approach to estimation of shear lensing, closely following the workmore » of Bernstein and Armstrong (2014). Our first order estimator reduces to their estimator in the limit of zero shear, but it also naturally allows for the case of non-constant shear and the easy calculation of correlation functions or power spectra using standard methods. Both our first-order estimator and Bernstein and Armstrong’s estimator exhibit a bias which is quadratic in true shear. Our third-order estimator is, at least in the realm of the toy problem of Bernstein and Armstrong, unbiased to 0.1% in relative shear errors Δg/g for shears up to |g| = 0.2.« less

  4. Building unbiased estimators from non-Gaussian likelihoods with application to shear estimation

    SciTech Connect (OSTI)

    Madhavacheril, Mathew S.; Sehgal, Neelima; McDonald, Patrick; Slosar, Ane E-mail: pvmcdonald@lbl.gov E-mail: anze@bnl.gov

    2015-01-01

    We develop a general framework for generating estimators of a given quantity which are unbiased to a given order in the difference between the true value of the underlying quantity and the fiducial position in theory space around which we expand the likelihood. We apply this formalism to rederive the optimal quadratic estimator and show how the replacement of the second derivative matrix with the Fisher matrix is a generic way of creating an unbiased estimator (assuming choice of the fiducial model is independent of data). Next we apply the approach to estimation of shear lensing, closely following the work of Bernstein and Armstrong (2014). Our first order estimator reduces to their estimator in the limit of zero shear, but it also naturally allows for the case of non-constant shear and the easy calculation of correlation functions or power spectra using standard methods. Both our first-order estimator and Bernstein and Armstrong's estimator exhibit a bias which is quadratic in true shear. Our third-order estimator is, at least in the realm of the toy problem of Bernstein and Armstrong, unbiased to 0.1% in relative shear errors ?g/g for shears up to |g|=0.2.

  5. Building unbiased estimators from non-gaussian likelihoods with application to shear estimation

    SciTech Connect (OSTI)

    Madhavacheril, Mathew S.; Slosar, Anze; McDonald, Patrick; Sehgal, Neelima

    2015-01-01

    We develop a general framework for generating estimators of a given quantity which are unbiased to a given order in the difference between the true value of the underlying quantity and the fiducial position in theory space around which we expand the likelihood. We apply this formalism to rederive the optimal quadratic estimator and show how the replacement of the second derivative matrix with the Fisher matrix is a generic way of creating an unbiased estimator (assuming choice of the fiducial model is independent of data). Next we apply the approach to estimation of shear lensing, closely following the work of Bernstein and Armstrong (2014). Our first order estimator reduces to their estimator in the limit of zero shear, but it also naturally allows for the case of non-constant shear and the easy calculation of correlation functions or power spectra using standard methods. Both our first-order estimator and Bernstein and Armstrongs estimator exhibit a bias which is quadratic in true shear. Our third-order estimator is, at least in the realm of the toy problem of Bernstein and Armstrong, unbiased to 0.1% in relative shear errors ?g/g for shears up to |g| = 0.2.

  6. Robust estimation procedure in panel data model

    SciTech Connect (OSTI)

    Shariff, Nurul Sima Mohamad; Hamzah, Nor Aishah

    2014-06-19

    The panel data modeling has received a great attention in econometric research recently. This is due to the availability of data sources and the interest to study cross sections of individuals observed over time. However, the problems may arise in modeling the panel in the presence of cross sectional dependence and outliers. Even though there are few methods that take into consideration the presence of cross sectional dependence in the panel, the methods may provide inconsistent parameter estimates and inferences when outliers occur in the panel. As such, an alternative method that is robust to outliers and cross sectional dependence is introduced in this paper. The properties and construction of the confidence interval for the parameter estimates are also considered in this paper. The robustness of the procedure is investigated and comparisons are made to the existing method via simulation studies. Our results have shown that robust approach is able to produce an accurate and reliable parameter estimates under the condition considered.

  7. Estimating exposure of terrestrial wildlife to contaminants

    SciTech Connect (OSTI)

    Sample, B.E.; Suter, G.W. II

    1994-09-01

    This report describes generalized models for the estimation of contaminant exposure experienced by wildlife on the Oak Ridge Reservation. The primary exposure pathway considered is oral ingestion, e.g. the consumption of contaminated food, water, or soil. Exposure through dermal absorption and inhalation are special cases and are not considered hereIN. Because wildlife mobile and generally consume diverse diets and because environmental contamination is not spatial homogeneous, factors to account for variation in diet, movement, and contaminant distribution have been incorporated into the models. To facilitate the use and application of the models, life history parameters necessary to estimate exposure are summarized for 15 common wildlife species. Finally, to display the application of the models, exposure estimates were calculated for four species using data from a source operable unit on the Oak Ridge Reservation.

  8. Reionization history and CMB parameter estimation

    SciTech Connect (OSTI)

    Dizgah, Azadeh Moradinezhad; Kinney, William H.; Gnedin, Nickolay Y. E-mail: gnedin@fnal.edu

    2013-05-01

    We study how uncertainty in the reionization history of the universe affects estimates of other cosmological parameters from the Cosmic Microwave Background. We analyze WMAP7 data and synthetic Planck-quality data generated using a realistic scenario for the reionization history of the universe obtained from high-resolution numerical simulation. We perform parameter estimation using a simple sudden reionization approximation, and using the Principal Component Analysis (PCA) technique proposed by Mortonson and Hu. We reach two main conclusions: (1) Adopting a simple sudden reionization model does not introduce measurable bias into values for other parameters, indicating that detailed modeling of reionization is not necessary for the purpose of parameter estimation from future CMB data sets such as Planck. (2) PCA analysis does not allow accurate reconstruction of the actual reionization history of the universe in a realistic case.

  9. State energy data report 1996: Consumption estimates

    SciTech Connect (OSTI)

    1999-02-01

    The State Energy Data Report (SEDR) provides annual time series estimates of State-level energy consumption by major economic sectors. The estimates are developed in the Combined State Energy Data System (CSEDS), which is maintained and operated by the Energy Information Administration (EIA). The goal in maintaining CSEDS is to create historical time series of energy consumption by State that are defined as consistently as possible over time and across sectors. CSEDS exists for two principal reasons: (1) to provide State energy consumption estimates to Members of Congress, Federal and State agencies, and the general public and (2) to provide the historical series necessary for EIA`s energy models. To the degree possible, energy consumption has been assigned to five sectors: residential, commercial, industrial, transportation, and electric utility sectors. Fuels covered are coal, natural gas, petroleum, nuclear electric power, hydroelectric power, biomass, and other, defined as electric power generated from geothermal, wind, photovoltaic, and solar thermal energy. 322 tabs.

  10. Estimates of emergency operating capacity in US manufacturing and nonmanufacturing industries - Volume 1: Concepts and Methodology

    SciTech Connect (OSTI)

    Belzer, D.B. ); Serot, D.E. ); Kellogg, M.A. )

    1991-03-01

    Development of integrated mobilization preparedness policies requires planning estimates of available productive capacity during national emergency conditions. Such estimates must be developed in a manner to allow evaluation of current trends in capacity and the consideration of uncertainties in various data inputs and in engineering assumptions. This study developed estimates of emergency operating capacity (EOC) for 446 manufacturing industries at the 4-digit Standard Industrial Classification (SIC) level of aggregation and for 24 key nonmanufacturing sectors. This volume lays out the general concepts and methods used to develop the emergency operating estimates. The historical analysis of capacity extends from 1974 through 1986. Some nonmanufacturing industries are included. In addition to mining and utilities, key industries in transportation, communication, and services were analyzed. Physical capacity and efficiency of production were measured. 3 refs., 2 figs., 12 tabs. (JF)

  11. Audit Requirements for For-Profit Recipients

    Broader source: Energy.gov [DOE]

    In association with the Office of Risk management, we are issuing guidance implementing the requirements of 10 CFR 600.316 which contains audit requirements for for-profit recipients of financial assistance awards (prime awards) and sub-awards.

  12. FEMP Updates Product Energy-Efficiency Requirements

    Broader source: Energy.gov [DOE]

    FEMP updated energy-efficiency requirements for Federal procurement of commercial boilers, water-cooled ice machines, and industrial (high/low bay) luminaires, and established new efficiency requirements for suspended luminaires.

  13. Salt Lake City- High Performance Buildings Requirement

    Broader source: Energy.gov [DOE]

    Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

  14. NEPA Guidance and Requirements- Search Index

    Office of Energy Efficiency and Renewable Energy (EERE)

    The NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use.

  15. Federal Prison Industries-Requirement for Market

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WWVv .acQnet.govfarlF ACfac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required...

  16. land requirements | OpenEI Community

    Open Energy Info (EERE)

    land requirements Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv...

  17. Decommissioning Cost Estimating Factors And Earned Value Integration

    SciTech Connect (OSTI)

    Sanford, P.C.; Cimmarron, E.

    2008-07-01

    The Rocky Flats 771 Project progressed from the planning stage of decommissioning a plutonium facility, through the strip-out of highly-contaminated equipment, removal of utilities and structural decontamination, and building demolition. Actual cost data was collected from the strip-out activities and compared to original estimates, allowing the development of cost by equipment groupings and types and over time. Separate data was developed from the project control earned value reporting and compared with the equipment data. The paper discusses the analysis to develop the detailed factors for the different equipment types, and the items that need to be considered during characterization of a similar facility when preparing an estimate. The factors are presented based on direct labor requirements by equipment type. The paper also includes actual support costs, and examples of fixed or one-time start-up costs. The integration of the estimate and the earned value system used for the 771 Project is also discussed. The paper covers the development of the earned value system as well as its application to a facility to be decommissioned and an existing work breakdown structure. Lessons learned are provided, including integration with scheduling and craft supervision, measurement approaches, and verification of scope completion. In summary: The work of decommissioning the Rocky Flats 771 Project process equipment was completed in 2003. Early in the planning process, we had difficulty in identifying credible data and implementing processes for estimating and controlling this work. As the project progressed, we were able to collect actual data on the costs of removing plutonium contaminated equipment from various areas over the life of this work and associate those costs with individual pieces of equipment. We also were able to develop and test out a system for measuring the earned value of a decommissioning project based on an evolving estimate. These were elements that

  18. Process Equipment Cost Estimation, Final Report

    SciTech Connect (OSTI)

    H.P. Loh; Jennifer Lyons; Charles W. White, III

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  19. Estimating vehicle height using homographic projections

    DOE Patents [OSTI]

    Cunningham, Mark F; Fabris, Lorenzo; Gee, Timothy F; Ghebretati, Jr., Frezghi H; Goddard, James S; Karnowski, Thomas P; Ziock, Klaus-peter

    2013-07-16

    Multiple homography transformations corresponding to different heights are generated in the field of view. A group of salient points within a common estimated height range is identified in a time series of video images of a moving object. Inter-salient point distances are measured for the group of salient points under the multiple homography transformations corresponding to the different heights. Variations in the inter-salient point distances under the multiple homography transformations are compared. The height of the group of salient points is estimated to be the height corresponding to the homography transformation that minimizes the variations.

  20. Requirements to coordinate agreements, milestones and decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental agreements,...

  1. ADA Requirements for Workplace Charging Installation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    ADA Requirements for Workplace Charging Installation More Documents & Publications Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan Workplace Charging...

  2. Quality Assurance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Quality Assurance Requirements The QARD provides the framework for both the achievement and verification of quality. Quality Assurance Requirements and Description (1.37 MB) More Documents & Publications Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description QA Corporate Board Meeting - December 2013 Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

  3. Building America Retrofit Participation Requirements and Release

    Broader source: Energy.gov [DOE]

    This form is for Building America team members and homeowners to complete verifying health and safety requirements have been met.

  4. Multi-model Estimates of Intercontinental Source-Receptor Relationships for Ozone Pollution

    SciTech Connect (OSTI)

    Fiore, A M; Dentener, F J; Wild, O; Cuvelier, C; Schultz, M G; Hess, P; Textor, C; Schulz, M; Doherty, R; Horowitz, L W; MacKenzie, I A; Sanderson, M G; Shindell, D T; Stevenson, D S; Szopa, S; Van Dingenen, R; Zeng, G; Atherton, C; Bergmann, D; Bey, I; Carmichael, G; Collins, W J; Duncan, B N; Faluvegi, G; Folberth, G; Gauss, M; Gong, S; Hauglustaine, D; Holloway, T; Isaksen, I A; Jacob, D J; Jonson, J E; Kaminski, J W; Keating, T J; Lupu, A; Marmer, E; Montanaro, V; Park, R; Pitari, G; Pringle, K J; Pyle, J A; Schroeder, S; Vivanco, M G; Wind, P; Wojcik, G; Wu, S; Zuber, A

    2008-10-16

    , and by the weaker relative response of annual incidences of daily maximum 8-hour average O{sub 3} above 60 ppb to emission reductions in a foreign region (<10-20% of that to domestic) as compared to the annual mean response (up to 50% of that to domestic). Applying the ensemble annual mean results to changes in anthropogenic emissions from 1996 to 2002, we estimate a Northern Hemispheric increase in background surface O{sub 3} of about 0.1 ppb yr{sup -1}, at the low end of the 0.1-0.5 ppb yr{sup -1} derived from observations. From an additional simulation in which global atmospheric methane was reduced, we infer that 20% reductions in anthropogenic methane emissions from a foreign source region would yield an O{sub 3} response in a receptor region that roughly equals that produced by combined 20% reductions of anthropogenic NO{sub x}, NMVOC and CO emissions from the foreign source region.

  5. Estimating Source Terms for Diverse Spent Nuclear Fuel Types

    SciTech Connect (OSTI)

    Brett Carlsen; Layne Pincock

    2004-11-01

    The U.S. Department of Energy (DOE) National Spent Nuclear Fuel Program is responsible for developing a defensible methodology for determining the radionuclide inventory for the DOE spent nuclear fuel (SNF) to be dispositioned at the proposed Monitored Geologic Repository at the Yucca Mountain Site. SNF owned by DOE includes diverse fuels from various experimental, research, and production reactors. These fuels currently reside at several DOE sites, universities, and foreign research reactor sites. Safe storage, transportation, and ultimate disposal of these fuels will require radiological source terms as inputs to safety analyses that support design and licensing of the necessary equipment and facilities. This paper summarizes the methodology developed for estimating radionuclide inventories associated with DOE-owned SNF. The results will support development of design and administrative controls to manage radiological risks and may later be used to demonstrate conformance with repository acceptance criteria.

  6. Estimate of Hanford Waste Rheology and Settling Behavior

    SciTech Connect (OSTI)

    Poloski, Adam P.; Wells, Beric E.; Tingey, Joel M.; Mahoney, Lenna A.; Hall, Mark N.; Thomson, Scott L.; Smith, Gary Lynn; Johnson, Michael E.; Meacham, Joseph E.; Knight, Mark A.; Thien, Michael G.; Davis, Jim J.; Onishi, Yasuo

    2007-10-26

    The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment and Immobilization Plant (WTP) will process and treat radioactive waste that is stored in tanks at the Hanford Site. Piping, pumps, and mixing vessels have been selected to transport, store, and mix the high-level waste slurries in the WTP. This report addresses the analyses performed by the Rheology Working Group (RWG) and Risk Assessment Working Group composed of Pacific Northwest National Laboratory (PNNL), Bechtel National Inc. (BNI), CH2M HILL, DOE Office of River Protection (ORP) and Yasuo Onishi Consulting, LLC staff on data obtained from documented Hanford waste analyses to determine a best-estimate of the rheology of the Hanford tank wastes and their settling behavior. The actual testing activities were performed and reported separately in referenced documentation. Because of this, many of the required topics below do not apply and are so noted.

  7. The analysis of normative requirements to materials of VVER components, basing on LBB concepts

    SciTech Connect (OSTI)

    Anikovsky, V.V.; Karzov, G.P.; Timofeev, B.T.

    1997-04-01

    The paper demonstrates an insufficiency of some requirements native Norms (when comparing them with the foreign requirements for the consideration of calculating situations): (1) leak before break (LBB); (2) short cracks; (3) preliminary loading (warm prestressing). In particular, the paper presents (1) Comparison of native and foreign normative requirements (PNAE G-7-002-86, Code ASME, BS 1515, KTA) on permissible stress levels and specifically on the estimation of crack initiation and propagation; (2) comparison of RF and USA Norms of pressure vessel material acceptance and also data of pressure vessel hydrotests; (3) comparison of Norms on the presence of defects (RF and USA) in NPP vessels, developments of defect schematization rules; foundation of a calculated defect (semi-axis correlation a/b) for pressure vessel and piping components: (4) sequence of defect estimation (growth of initial defects and critical crack sizes) proceeding from the concept LBB; (5) analysis of crack initiation and propagation conditions according to the acting Norms (including crack jumps); (6) necessity to correct estimation methods of ultimate states of brittle an ductile fracture and elastic-plastic region as applied to calculating situation: (a) LBB and (b) short cracks; (7) necessity to correct estimation methods of ultimate states with the consideration of static and cyclic loading (warm prestressing effect) of pressure vessel; estimation of the effect stability; (8) proposals on PNAE G-7-002-86 Norm corrections.

  8. Estimated Costing of an EUV Mask Inspection Microscope

    SciTech Connect (OSTI)

    Barty, A; Taylor, J S

    2002-08-20

    This document is the fourth sub-report of the EUV AIM design study being conducted at LLNL on behalf of International SEMATECH (ISMT) and addresses the issue of preliminary system costing. The purpose of the LLNL study, as identified in section 1.2 of the statement of work, is to research the basic user requirements of an actinic defect characterization tool, potential design configurations and top-level specifications. The objectives of this design study specifically identified in section 1.3 of the statement of work were to: (1) Determine the user requirements of an actinic defect characterization tool; (2) Determine if an EUV AIM tool is an appropriate platform for actinic defect characterization; (3) Determine possible design configurations and top-level performance specifications; (4) Identify potential technical issues and risks of different technical approaches; (5) Provide estimates of cost relating to different technical approaches; and (6) Provide simulated performance for key subsystems and the entire system. The sub-sections of the study to be addressed were accordingly defined in the statement of work as being: (1) Formulation of top-level specifications; (2) Identification of system configurations suitable for meeting the top-level specifications; (3) Preliminary design of imaging systems; (4) Preliminary design of illumination systems; (5) Prediction and comparison of performance through aerial image calculation; (6) Identification of sub-system requirements; (7) Identification of potential vendors; (8) Estimation of system cost; (9) Identification of technical issues; and (10) Definition of technology transfer or development required. Points 1 to 7 and 9 to 10 are addressed in separate reports to ISMT. This report addresses item 8, system costing, and is provided as a separate report so that its content can be kept confidential at the discretion of ISMT. In this analysis we cost two systems--one based on normal-incidence multilayer-coated optics and

  9. Estimating the uncertainty in underresolved nonlinear dynamics

    SciTech Connect (OSTI)

    Chorin, Alelxandre; Hald, Ole

    2013-06-12

    The Mori-Zwanzig formalism of statistical mechanics is used to estimate the uncertainty caused by underresolution in the solution of a nonlinear dynamical system. A general approach is outlined and applied to a simple example. The noise term that describes the uncertainty turns out to be neither Markovian nor Gaussian. It is argued that this is the general situation.

  10. SIENA Customer Problem Statement and Requirements

    SciTech Connect (OSTI)

    L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

    2000-08-01

    This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

  11. DOE Zero Energy Ready Home Savings and Cost Estimate Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savings and Cost Estimate Summary DOE Zero Energy Ready Home Savings and Cost Estimate Summary The U.S. Department of Energy Zero Energy Ready Home Savings and Cost Estimate ...

  12. Renewable Energy Requirements for Future Building Codes: Options for Compliance

    SciTech Connect (OSTI)

    Dillon, Heather E.; Antonopoulos, Chrissi A.; Solana, Amy E.; Russo, Bryan J.

    2011-09-30

    Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute

  13. Beam break-up estimates for the ERL at BNL

    SciTech Connect (OSTI)

    Ben-Zvi, I.; Calaga, R.; Hahn, H.; Hammons, L.; Johnson, E.; Kayran, D.; Litvinenko, V.; Kewisch, J.; Xu, W.

    2010-05-23

    A prototype Ampere-class superconducting energy recovery linac (ERL) is under advanced construction at BNL. The ERL facility is comprised of a five-cell SC Linac plus a half-cell SC photo-injector RF electron gun, both operating at 703.75 MHz. The facility is designed for either a high-current mode of operation up to 0.5 A at 703.75 MHz or a high-bunch-charge mode of 5 nC at 10 MHz bunch frequency. The R&D facility serves a test bed for an envisioned electron-hadron collider, eRHIC. The high-current, high-charge operating parameters make effective higher-order-mode (HOM) damping mandatory, and requires the determination of HOM tolerances for a cavity upgrade. The niobium cavity has been tested at superconducting temperatures and has provided measured quality factors (Q) for a large number of modes. These numbers were used for the estimate of the beam breakup instability (BBU). The facility will be assembled with a highly flexible lattice covering a vast operational parameter space for verification of the estimates and to serve as a test bed for the concepts directed at future projects.

  14. Characterization and estimation of permeability correlation structure from performance data

    SciTech Connect (OSTI)

    Ershaghi, I.; Al-Qahtani, M.

    1997-08-01

    In this study, the influence of permeability structure and correlation length on the system effective permeability and recovery factors of 2-D cross-sectional reservoir models, under waterflood, is investigated. Reservoirs with identical statistical representation of permeability attributes are shown to exhibit different system effective permeability and production characteristics which can be expressed by a mean and variance. The mean and variance are shown to be significantly influenced by the correlation length. Detailed quantification of the influence of horizontal and vertical correlation lengths for different permeability distributions is presented. The effect of capillary pressure, P{sub c1} on the production characteristics and saturation profiles at different correlation lengths is also investigated. It is observed that neglecting P{sub c} causes considerable error at large horizontal and short vertical correlation lengths. The effect of using constant as opposed to variable relative permeability attributes is also investigated at different correlation lengths. Next we studied the influence of correlation anisotropy in 2-D reservoir models. For a reservoir under five-spot waterflood pattern, it is shown that the ratios of breakthrough times and recovery factors of the wells in each direction of correlation are greatly influenced by the degree of anisotropy. In fully developed fields, performance data can aid in the recognition of reservoir anisotropy. Finally, a procedure for estimating the spatial correlation length from performance data is presented. Both the production performance data and the system`s effective permeability are required in estimating the correlation length.

  15. Time Adaptive Conditional Kernel Density Estimation for Wind...

    Office of Scientific and Technical Information (OSTI)

    Time Adaptive Conditional Kernel Density Estimation for Wind Power Forecasting Citation Details In-Document Search Title: Time Adaptive Conditional Kernel Density Estimation for ...

  16. Estimating Carbon Supply Curves for Global Forests and Other...

    Open Energy Info (EERE)

    Estimating Carbon Supply Curves for Global Forests and Other Land Uses Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Estimating Carbon Supply Curves for Global Forests...

  17. A Review of Cost Estimation in New Technologies - Implications...

    Energy Savers [EERE]

    A Review of Cost Estimation in New Technologies - Implications for Energy Process Plants A Review of Cost Estimation in New Technologies - Implications for Energy Process Plants ...

  18. Error Estimation for Fault Tolerance in Numerical Integration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Error Estimation for Fault Tolerance in Numerical Integration Solvers Event Sponsor: ... In numerical integration solvers, approximation error can be estimated at a low cost. We ...

  19. Process Equipment Cost Estimation, Final Report (Technical Report...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Equipment Cost Estimation, Final Report Citation Details In-Document Search Title: Process Equipment Cost Estimation, Final Report You are accessing a document from the ...

  20. Estimating the Impact (Energy, Emissions and Economics) of the...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Estimating the Impact (Energy, Emissions and Economics) of the US Fluid Power Industry Citation Details In-Document Search Title: Estimating the Impact (Energy, ...

  1. Estimating the Benefits and Costs of Distributed Energy Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Estimating the Benefits and Costs of Distributed Energy Technologies Workshop - Agenda and Summary Estimating the Benefits and Costs of Distributed Energy Technologies Workshop -...

  2. Contribution to the development of DOE ARM Climate Best Estimate...

    Office of Scientific and Technical Information (OSTI)

    Contribution to the development of DOE ARM Climate Best Estimate Data (ARMBE) products: ... Title: Contribution to the development of DOE ARM Climate Best Estimate Data (ARMBE) ...

  3. Estimating the system price of redox flow batteries for grid...

    Office of Scientific and Technical Information (OSTI)

    Estimating the system price of redox flow batteries for grid storage Citation Details ... Title: Estimating the system price of redox flow batteries for grid storage Authors: Ha, ...

  4. Property:Number of Plants included in Capacity Estimate | Open...

    Open Energy Info (EERE)

    Plants included in Capacity Estimate Jump to: navigation, search Property Name Number of Plants included in Capacity Estimate Property Type Number Retrieved from "http:...

  5. Property:Number of Plants Included in Planned Estimate | Open...

    Open Energy Info (EERE)

    Number of Plants Included in Planned Estimate Jump to: navigation, search Property Name Number of Plants Included in Planned Estimate Property Type String Description Number of...

  6. Estimating Costs and Efficiency of Storage, Demand, and Heat...

    Energy Savers [EERE]

    Estimating Costs and Efficiency of Storage, Demand, and Heat Pump Water Heaters Estimating Costs and Efficiency of Storage, Demand, and Heat Pump Water Heaters A water heater's ...

  7. ARM Climate Modeling Best Estimate Lamont, OK Statistical Summary...

    Office of Scientific and Technical Information (OSTI)

    Climate Modeling Best Estimate Lamont, OK Statistical Summary (ARMBE-CLDRAD SGPC1) Title: ARM Climate Modeling Best Estimate Lamont, OK Statistical Summary (ARMBE-CLDRAD SGPC1) ...

  8. Estimation of Anisotoropy from Total Cross Section and Optical...

    Office of Scientific and Technical Information (OSTI)

    Conference: Estimation of Anisotoropy from Total Cross Section and Optical Model Citation Details In-Document Search Title: Estimation of Anisotoropy from Total Cross Section and ...

  9. The ARM Best Estimate 2-dimensional Gridded Surface (Dataset...

    Office of Scientific and Technical Information (OSTI)

    2-dimensional Gridded Surface Title: The ARM Best Estimate 2-dimensional Gridded Surface The ARM Best Estimate 2-dimensional Gridded Surface (ARMBE2DGRID) data set merges together ...

  10. Report Now Available: DC Microgrids Scoping Study--Estimate of...

    Office of Environmental Management (EM)

    Report Now Available: DC Microgrids Scoping Study--Estimate of Technical and Economic Benefits (March 2015) Report Now Available: DC Microgrids Scoping Study--Estimate of Technical ...

  11. A Review of Geothermal Resource Estimation Methodology | Open...

    Open Energy Info (EERE)

    Geothermal Resource Estimation Methodology Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: A Review of Geothermal Resource Estimation...

  12. Error estimates for fission neutron outputs (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Error estimates for fission neutron outputs Citation Details In-Document Search Title: Error estimates for fission neutron outputs You are accessing a document from the...

  13. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    SciTech Connect (OSTI)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided.

  14. Prediction of Regulation Reserve Requirements in California ISO Control Area based on BAAL Standard

    SciTech Connect (OSTI)

    Etingov, Pavel V.; Makarov, Yuri V.; Samaan, Nader A.; Ma, Jian; Loutan, Clyde

    2013-07-21

    This paper presents new methodologies developed at Pacific Northwest National Laboratory (PNNL) to estimate regulation capacity requirements in the California ISO control area. Two approaches have been developed: (1) an approach based on statistical analysis of actual historical area control error (ACE) and regulation data, and (2) an approach based on balancing authority ACE limit control performance standard. The approaches predict regulation reserve requirements on a day-ahead basis including upward and downward requirements, for each operating hour of a day. California ISO data has been used to test the performance of the proposed algorithms. Results show that software tool allows saving up to 30% on the regulation procurements cost .

  15. Environmental management requirements/defensible costs project. Final report

    SciTech Connect (OSTI)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  16. CosmoSIS: Modular cosmological parameter estimation

    SciTech Connect (OSTI)

    Zuntz, J.; Paterno, M.; Jennings, E.; Rudd, D.; Manzotti, A.; Dodelson, S.; Bridle, S.; Sehrish, S.; Kowalkowski, J.

    2015-06-09

    Cosmological parameter estimation is entering a new era. Large collaborations need to coordinate high-stakes analyses using multiple methods; furthermore such analyses have grown in complexity due to sophisticated models of cosmology and systematic uncertainties. In this paper we argue that modularity is the key to addressing these challenges: calculations should be broken up into interchangeable modular units with inputs and outputs clearly defined. Here we present a new framework for cosmological parameter estimation, CosmoSIS, designed to connect together, share, and advance development of inference tools across the community. We describe the modules already available in CosmoSIS, including CAMB, Planck, cosmic shear calculations, and a suite of samplers. Lastly, we illustrate it using demonstration code that you can run out-of-the-box with the installer available at http://bitbucket.org/joezuntz/cosmosis

  17. CosmoSIS: Modular cosmological parameter estimation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zuntz, J.; Paterno, M.; Jennings, E.; Rudd, D.; Manzotti, A.; Dodelson, S.; Bridle, S.; Sehrish, S.; Kowalkowski, J.

    2015-06-09

    Cosmological parameter estimation is entering a new era. Large collaborations need to coordinate high-stakes analyses using multiple methods; furthermore such analyses have grown in complexity due to sophisticated models of cosmology and systematic uncertainties. In this paper we argue that modularity is the key to addressing these challenges: calculations should be broken up into interchangeable modular units with inputs and outputs clearly defined. Here we present a new framework for cosmological parameter estimation, CosmoSIS, designed to connect together, share, and advance development of inference tools across the community. We describe the modules already available in CosmoSIS, including CAMB, Planck, cosmicmore » shear calculations, and a suite of samplers. Lastly, we illustrate it using demonstration code that you can run out-of-the-box with the installer available at http://bitbucket.org/joezuntz/cosmosis« less

  18. Combined Estimation of Hydrogeologic Conceptual Model and Parameter Uncertainty

    SciTech Connect (OSTI)

    Meyer, Philip D.; Ye, Ming; Neuman, Shlomo P.; Cantrell, Kirk J.

    2004-03-01

    The objective of the research described in this report is the development and application of a methodology for comprehensively assessing the hydrogeologic uncertainties involved in dose assessment, including uncertainties associated with conceptual models, parameters, and scenarios. This report describes and applies a statistical method to quantitatively estimate the combined uncertainty in model predictions arising from conceptual model and parameter uncertainties. The method relies on model averaging to combine the predictions of a set of alternative models. Implementation is driven by the available data. When there is minimal site-specific data the method can be carried out with prior parameter estimates based on generic data and subjective prior model probabilities. For sites with observations of system behavior (and optionally data characterizing model parameters), the method uses model calibration to update the prior parameter estimates and model probabilities based on the correspondence between model predictions and site observations. The set of model alternatives can contain both simplified and complex models, with the requirement that all models be based on the same set of data. The method was applied to the geostatistical modeling of air permeability at a fractured rock site. Seven alternative variogram models of log air permeability were considered to represent data from single-hole pneumatic injection tests in six boreholes at the site. Unbiased maximum likelihood estimates of variogram and drift parameters were obtained for each model. Standard information criteria provided an ambiguous ranking of the models, which would not justify selecting one of them and discarding all others as is commonly done in practice. Instead, some of the models were eliminated based on their negligibly small updated probabilities and the rest were used to project the measured log permeabilities by kriging onto a rock volume containing the six boreholes. These four

  19. Numerical Estimation of the Spent Fuel Ratio

    SciTech Connect (OSTI)

    Lindgren, Eric R.; Durbin, Samuel; Wilke, Jason; Margraf, J.; Dunn, T. A.

    2016-01-01

    Sabotage of spent nuclear fuel casks remains a concern nearly forty years after attacks against shipment casks were first analyzed and has a renewed relevance in the post-9/11 environment. A limited number of full-scale tests and supporting efforts using surrogate materials, typically depleted uranium dioxide (DUO 2 ), have been conducted in the interim to more definitively determine the source term from these postulated events. However, the validity of these large- scale results remain in question due to the lack of a defensible spent fuel ratio (SFR), defined as the amount of respirable aerosol generated by an attack on a mass of spent fuel compared to that of an otherwise identical surrogate. Previous attempts to define the SFR in the 1980's have resulted in estimates ranging from 0.42 to 12 and include suboptimal experimental techniques and data comparisons. Because of the large uncertainty surrounding the SFR, estimates of releases from security-related events may be unnecessarily conservative. Credible arguments exist that the SFR does not exceed a value of unity. A defensible determination of the SFR in this lower range would greatly reduce the calculated risk associated with the transport and storage of spent nuclear fuel in dry cask systems. In the present work, the shock physics codes CTH and ALE3D were used to simulate spent nuclear fuel (SNF) and DUO 2 targets impacted by a high-velocity jet at an ambient temperature condition. These preliminary results are used to illustrate an approach to estimate the respirable release fraction for each type of material and ultimately, an estimate of the SFR. This page intentionally blank

  20. Low-Temperature Hydrothermal Resource Potential Estimate

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Katherine Young

    2016-06-30

    Compilation of data (spreadsheet and shapefiles) for several low-temperature resource types, including isolated springs and wells, delineated area convection systems, sedimentary basins and coastal plains sedimentary systems. For each system, we include estimates of the accessible resource base, mean extractable resource and beneficial heat. Data compiled from USGS and other sources. The paper (submitted to GRC 2016) describing the methodology and analysis is also included.

  1. Knowledge Based Estimation of Material Release Transients

    Energy Science and Technology Software Center (OSTI)

    1998-07-29

    KBERT is an easy to use desktop decision support tool for estimating public and in-facility worker doses and consequences of radioactive material releases in non-reactort nuclear facilities. It automatically calculates release and respirable fractions based on published handbook data, and calculates material transport concurrently with personnel evacuation simulations. Any facility layout can be modeled easily using the intuitive graphical user interface.

  2. State energy data report 1992: Consumption estimates

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This is a report of energy consumption by state for the years 1960 to 1992. The report contains summaries of energy consumption for the US and by state, consumption by source, comparisons to other energy use reports, consumption by energy use sector, and describes the estimation methodologies used in the preparation of the report. Some years are not listed specifically although they are included in the summary of data.

  3. Generalized REGression Package for Nonlinear Parameter Estimation

    Energy Science and Technology Software Center (OSTI)

    1995-05-15

    GREG computes modal (maximum-posterior-density) and interval estimates of the parameters in a user-provided Fortran subroutine MODEL, using a user-provided vector OBS of single-response observations or matrix OBS of multiresponse observations. GREG can also select the optimal next experiment from a menu of simulated candidates, so as to minimize the volume of the parametric inference region based on the resulting augmented data set.

  4. Budget estimates fiscal year 1995: Volume 10

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report contains the Nuclear Regulatory Commission (NRC) fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1995. The NRC 1995 budget request is $546,497,000. This is an increase of $11,497,000 above the proposed level for FY 1994. The NRC FY 1995 budget request is 3,218 FTEs. This is a decrease of 75 FTEs below the 1994 proposed level.

  5. Communications circuit including a linear quadratic estimator

    DOE Patents [OSTI]

    Ferguson, Dennis D.

    2015-07-07

    A circuit includes a linear quadratic estimator (LQE) configured to receive a plurality of measurements a signal. The LQE is configured to weight the measurements based on their respective uncertainties to produce weighted averages. The circuit further includes a controller coupled to the LQE and configured to selectively adjust at least one data link parameter associated with a communication channel in response to receiving the weighted averages.

  6. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  7. Appendix IGP: Individual and Groundwater Protection Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IGP-2014 Individual and Groundwater Protection Requirements United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix IGP-2014 Individual and Groundwater Protection Requirements Table of Contents IGP-1.0 Introduction IGP-2.0 Individual Protection Requirements IGP-2.1 Compliance Assessment of Undisturbed Performance IGP-2.2 Dose Calculation IGP-2.2.1 Transport Pathway IGP-2.2.2 Bounding Analysis

  8. Conditions and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Postdoctoral Research Awards » Award Information » Conditions and Requirements Conditions and Requirements Conditions and requirements for Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are spelled out below: Length of the Appointment The Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are for two years. The initial appointment period for the EERE Postdoctoral Research Awards is one year. Appointments may be extended for a second year

  9. TRENDS IN ESTIMATED MIXING DEPTH DAILY MAXIMUMS

    SciTech Connect (OSTI)

    Buckley, R; Amy DuPont, A; Robert Kurzeja, R; Matt Parker, M

    2007-11-12

    Mixing depth is an important quantity in the determination of air pollution concentrations. Fireweather forecasts depend strongly on estimates of the mixing depth as a means of determining the altitude and dilution (ventilation rates) of smoke plumes. The Savannah River United States Forest Service (USFS) routinely conducts prescribed fires at the Savannah River Site (SRS), a heavily wooded Department of Energy (DOE) facility located in southwest South Carolina. For many years, the Savannah River National Laboratory (SRNL) has provided forecasts of weather conditions in support of the fire program, including an estimated mixing depth using potential temperature and turbulence change with height at a given location. This paper examines trends in the average estimated mixing depth daily maximum at the SRS over an extended period of time (4.75 years) derived from numerical atmospheric simulations using two versions of the Regional Atmospheric Modeling System (RAMS). This allows for differences to be seen between the model versions, as well as trends on a multi-year time frame. In addition, comparisons of predicted mixing depth for individual days in which special balloon soundings were released are also discussed.

  10. Cost estimate of initial SSC experimental equipment

    SciTech Connect (OSTI)

    1986-06-01

    The cost of the initial detector complement at recently constructed colliding beam facilities (or at those under construction) has been a significant fraction of the cost of the accelerator complex. Because of the complexity of large modern-day detectors, the time-scale for their design and construction is comparable to the time-scale needed for accelerator design and construction. For these reasons it is appropriate to estimate the cost of the anticipated detector complement in parallel with the cost estimates of the collider itself. The fundamental difficulty with this procedure is that, whereas a firm conceptual design of the collider does exist, comparable information is unavailable for the detectors. Traditionally, these have been built by the high energy physics user community according to their perception of the key scientific problems that need to be addressed. The role of the accelerator laboratory in that process has involved technical and managerial coordination and the allocation of running time and local facilities among the proposed experiments. It seems proper that the basic spirit of experimentation reflecting the scientific judgment of the community should be preserved at the SSC. Furthermore, the formal process of initiation of detector proposals can only start once the SSC has been approved as a construction project and a formal laboratory administration put in place. Thus an ad hoc mechanism had to be created to estimate the range of potential detector needs, potential detector costs, and associated computing equipment.

  11. HEP/NP Requirements Review 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NP Program Offices. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  12. Thompson named VP of Northwest Requirements Marketing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thompson-named-VP-of-Northwest-Requirements-Marketing Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  13. Richard Gerber! Harvey Wasserman! Requirements Reviews Organizers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2 014 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading NERSC users & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Adv. C omp. S cience R esearch J an. 2 014 Basic E nergy S ciences O ct 2 014 Reports From 8 Requirements Reviews Have Been Published 3 h@p://www.nersc.gov/science/hpc---requirements---reviews/reports/ * CompuFng a nd s

  14. REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I. Approximate number of personnel and man-hours required to complete the activity ... time) Number of Personnel:... Man- Hours:... J. Comments: RBSM ...

  15. All Required: Safety Training - Chris Westerfeldt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TUNL Summer 2013 Lectures & Tutorials Thursday May 30 st - 9 AM - 3:30 PM (LSRC Room A247) All Required: Safety Training - Chris Westerfeldt Friday May 31 st - 9 AM REU Required: TUNL, LENA & FEL Tour - (Meet in TUNL Lobby) Monday June 10 th - 10 AM - 11:30 AM (DFELL Conference Room, 117) REU Required: Building Blocks of Nuclei - Mohammad Ahmed Monday June 10 th - 2 PM - 3:30 PM (DFELL Conference Room, 117) REU Required: N-N Interactions and Local Accelerators - Mohammad Ahmed Wednesday

  16. City of Dubuque- Solar Thermal Licensing Requirement

    Broader source: Energy.gov [DOE]

    Installers are also required to obtain a permit before altering or installing a system. Application details are available on the program website.

  17. Studying the Communications Requirements of Electric Utilities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid ...

  18. Biosafety Facilities - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, Biosafety Facilities by David Freshwater Functional areas: Defense Nuclear Facility Safety and Health Requirement, Safety and Security, The Guide assists DOENNSA field elements...

  19. Federal / State Legislative & Regulatory Changes Required for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of E15 (2.81 MB) More Documents & Publications Vehicle Certification Test Fuel and Ethanol ...

  20. NERSC HPC Requirements Reviews: Target 2017

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Basic Energy Sciences (BES) Biological and Environmental Research (BER) Fusion Energy Sciences (FES) High Energy Physics (HEP) Nuclear Physics (NP) Requirements Reviews: Target ...

  1. Facility Safety - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH)...

  2. Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  3. Delegation Procedures - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  4. Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  5. Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  6. ADA Requirements for Workplace Charging Installation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    This Guidance provides best practices, special design guidelines and requirements for installing plug-in electric vehicle charging stations in compliance with ADA. When designing ...

  7. Physical Protection - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2A, Physical Protection by jcronin Functional areas: Security, This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys...

  8. Web Requirements and Best Practices for PDFs

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Energy Efficiency and Renewable Energy (EERE) has requirements for creating PDFs that are compliant with Section 508 and are optimized for search engine optimization.

  9. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM ...

  10. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM ...

  11. Methods to estimate stranded commitments for a restructuring US electricity industry

    SciTech Connect (OSTI)

    Hirst, E.; Hadley, S.; Baxter, L.

    1996-01-01

    Estimates of stranded commitments for US investor-owned electric utilities range widely, from as little as $20 billion to as much as $500 billion (more than double the shareholder equity in US utilities). These potential losses are a consequence of the above-market book values for some utility-owned power plants, long-term power-purchase contracts, deferred income taxes, regulatory assets, and public-policy programs. Because of the wide range of estimates and the potentially large dollar amounts involved, state and federal regulators need a clear understanding of the methods used to calculate these estimates. In addition, they may want simple methods that they can use to check the reasonableness of the estimates that utilities and other parties present in regulatory proceedings. This report explains various top-down and bottom-up methods to calculate stranded commitments. The purpose of this analysis is to help regulators and others understand the implications of different analytical approaches to estimating stranded-commitment amounts. Top-down methods, because they use the utility as the unit of analysis, are simple to apply and to understand. However, their aggregate nature makes it difficult to determine what specific assets and liabilities affect their estimates. Bottom-up methods use the individual asset (e.g., power plant) or liability (e.g., power-purchase contract, fuel-supply contract, and deferred income taxes) as the unit of analysis. These methods have substantial data and computational requirements.

  12. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrogen Station Cost Estimates Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates M. Melaina and M. Penev National Renewable Energy Laboratory Technical Report NREL/TP-5400-56412 September 2013 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the National Renewable Energy Laboratory (NREL) at

  13. Part V: Section H - Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H SPECIAL CONTRACT REQUIREMENTS DE-AC36-08GO28308 Modification M962 Section H - Page 2 of 52 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries ............................................................................................. 4 H.2 Reserved ............................................................................................................................ 4 H.3 Employee Compensation: Pay and Benefits

  14. EERE Digital Data Management Planning Requirements

    Broader source: Energy.gov [DOE]

    To integrate data management planning into an overall research plan, here are requirements which apply to all EERE research solicitations and invitations for new, renewal, and some supplemental funding issued on or after Oct. 1, 2014. These requirements apply to proposals from all organizations, including academic institutions, DOE national laboratories, and others.

  15. Requirements for transporting the TMI-2 core

    SciTech Connect (OSTI)

    Wilkins, D.E.

    1983-08-01

    This report summarizes the requirements associated with the actual transport of core debris from the damaged Three Mile Island Unit 2 reactor to the Idaho National Engineering Laboratory. The requirements are discussed under six headings: accountability, security, quality, safety, environment, and transportation.

  16. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  17. Moly99 Production Facility: Report on Beamline Components, Requirements, Costs

    SciTech Connect (OSTI)

    Bishofberger, Kip A.

    2015-12-23

    In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introduced briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.

  18. A model for estimation of potential generation of waste electrical and electronic equipment in Brazil

    SciTech Connect (OSTI)

    Araujo, Marcelo Guimaraes; Magrini, Alessandra; Mahler, Claudio Fernando; Bilitewski, Bernd

    2012-02-15

    Highlights: Black-Right-Pointing-Pointer Literature of WEEE generation in developing countries is reviewed. Black-Right-Pointing-Pointer We analyse existing estimates of WEEE generation for Brazil. Black-Right-Pointing-Pointer We present a model for WEEE generation estimate. Black-Right-Pointing-Pointer WEEE generation of 3.77 kg/capita year for 2008 is estimated. Black-Right-Pointing-Pointer Use of constant lifetime should be avoided for non-mature market products. - Abstract: Sales of electrical and electronic equipment are increasing dramatically in developing countries. Usually, there are no reliable data about quantities of the waste generated. A new law for solid waste management was enacted in Brazil in 2010, and the infrastructure to treat this waste must be planned, considering the volumes of the different types of electrical and electronic equipment generated. This paper reviews the literature regarding estimation of waste electrical and electronic equipment (WEEE), focusing on developing countries, particularly in Latin America. It briefly describes the current WEEE system in Brazil and presents an updated estimate of generation of WEEE. Considering the limited available data in Brazil, a model for WEEE generation estimation is proposed in which different methods are used for mature and non-mature market products. The results showed that the most important variable is the equipment lifetime, which requires a thorough understanding of consumer behavior to estimate. Since Brazil is a rapidly expanding market, the 'boom' in waste generation is still to come. In the near future, better data will provide more reliable estimation of waste generation and a clearer interpretation of the lifetime variable throughout the years.

  19. Estimate of federal relighting potential and demand for efficient lighting products

    SciTech Connect (OSTI)

    Shankle, S.A.; Dirks, J.A.; Elliott, D.B.; Richman, E.E.; Grover, S.E.

    1993-11-01

    The increasing level of electric utility rebates for energy-efficient lighting retrofits has recently prompted concern over the adequacy of the market supply of energy-efficient lighting products (Energy User News 1991). In support of the U.S. Department of Energy`s Federal Energy Management Program, Pacific Northwest Laboratory (PNL) has developed an estimate of the total potential for energy-efficient lighting retrofits in federally owned buildings. This estimate can be used to address the issue of the impact of federal relighting projects on the supply of energy-efficient lighting products. The estimate was developed in 1992, using 1991 data. Any investments in energy-efficient lighting products that occurred in 1992 will reduce the potential estimated here. This analysis proceeds by estimating the existing stock of lighting fixtures in federally owned buildings. The lighting technology screening matrix is then used to determine the minimum life-cycle cost retrofit for each type of existing lighting fixture. Estimates of the existing stock are developed for (1) four types of fluorescent lighting fixtures (2-, 3-, and 4-lamp, F40 4-foot fixtures, and 2-lamp, F96 8-foot fixtures, all with standard magnetic ballasts); (2) one type of incandescent fixture (a 75-watt single bulb fixture); and (3) one type of exit sign (containing two 20-watt incandescent bulbs). Estimates of the existing stock of lighting fixtures in federally owned buildings, estimates of the total potential demand for energy-efficient lighting products if all cost-effective retrofits were undertaken immediately, and total potential annual energy savings (in MWh and dollars), the total investment required to obtain the energy savings and the present value of the efficiency investment, are presented.

  20. Catastrophic photometric redshift errors: Weak-lensing survey requirements

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Bernstein, Gary; Huterer, Dragan

    2010-01-11

    We study the sensitivity of weak lensing surveys to the effects of catastrophic redshift errors - cases where the true redshift is misestimated by a significant amount. To compute the biases in cosmological parameters, we adopt an efficient linearized analysis where the redshift errors are directly related to shifts in the weak lensing convergence power spectra. We estimate the number Nspec of unbiased spectroscopic redshifts needed to determine the catastrophic error rate well enough that biases in cosmological parameters are below statistical errors of weak lensing tomography. While the straightforward estimate of Nspec is ~106 we find that using onlymore » the photometric redshifts with z ≤ 2.5 leads to a drastic reduction in Nspec to ~ 30,000 while negligibly increasing statistical errors in dark energy parameters. Therefore, the size of spectroscopic survey needed to control catastrophic errors is similar to that previously deemed necessary to constrain the core of the zs – zp distribution. We also study the efficacy of the recent proposal to measure redshift errors by cross-correlation between the photo-z and spectroscopic samples. We find that this method requires ~ 10% a priori knowledge of the bias and stochasticity of the outlier population, and is also easily confounded by lensing magnification bias. In conclusion, the cross-correlation method is therefore unlikely to supplant the need for a complete spectroscopic redshift survey of the source population.« less

  1. Estimated United States Transportation Energy Use 2005

    SciTech Connect (OSTI)

    Smith, C A; Simon, A J; Belles, R D

    2011-11-09

    A flow chart depicting energy flow in the transportation sector of the United States economy in 2005 has been constructed from publicly available data and estimates of national energy use patterns. Approximately 31,000 trillion British Thermal Units (trBTUs) of energy were used throughout the United States in transportation activities. Vehicles used in these activities include automobiles, motorcycles, trucks, buses, airplanes, rail, and ships. The transportation sector is powered primarily by petroleum-derived fuels (gasoline, diesel and jet fuel). Biomass-derived fuels, electricity and natural gas-derived fuels are also used. The flow patterns represent a comprehensive systems view of energy used within the transportation sector.

  2. Position estimation of transceivers in communication networks

    DOE Patents [OSTI]

    Kent, Claudia A.; Dowla, Farid

    2008-06-03

    This invention provides a system and method using wireless communication interfaces coupled with statistical processing of time-of-flight data to locate by position estimation unknown wireless receivers. Such an invention can be applied in sensor network applications, such as environmental monitoring of water in the soil or chemicals in the air where the position of the network nodes is deemed critical. Moreover, the present invention can be arranged to operate in areas where a Global Positioning System (GPS) is not available, such as inside buildings, caves, and tunnels.

  3. Cell Total Activity Final Estimate.xls

    Office of Legacy Management (LM)

    WSSRAP Cell Total Activity Final Estimate (calculated September 2002, Fleming) (Waste streams & occupied cell volumes from spreadsheet titled "cell waste volumes-8.23.02 with macros.xls") Waste Stream a Volume (cy) Mass (g) 2 Radiological Profile 3 Nuclide Activity (Ci) 4 Total % of Total U-238 U-234 U-235 Th-228 Th-230 Th-232 Ra-226 Ra-228 Rn-222 5 Activity if > 1% Raffinate Pits Work Zone (Ci) Raffinate processed through CSS Plant 1 159990 1.49E+11 Raffinate 6.12E+01 6.12E+01

  4. PLANNING TOOLS FOR ESTIMATING RADIATION EXPOSURE AT THE NATIONAL IGNITION FACILITY

    SciTech Connect (OSTI)

    Verbeke, J; Young, M; Brereton, S; Dauffy, L; Hall, J; Hansen, L; Khater, H; Kim, S; Pohl, B; Sitaraman, S

    2010-10-22

    A set of computational tools was developed to help estimate and minimize potential radiation exposure to workers from material activation in the National Ignition Facility (NIF). AAMI (Automated ALARA-MCNP Interface) provides an efficient, automated mechanism to perform the series of calculations required to create dose rate maps for the entire facility with minimal manual user input. NEET (NIF Exposure Estimation Tool) is a web application that combines the information computed by AAMI with a given shot schedule to compute and display the dose rate maps as a function of time. AAMI and NEET are currently used as work planning tools to determine stay-out times for workers following a given shot or set of shots, and to help in estimating integrated doses associated with performing various maintenance activities inside the target bay. Dose rate maps of the target bay were generated following a low-yield 10{sup 16} D-T shot and will be presented in this paper.

  5. Integrated State Estimation and Contingency Analysis Software Implementation using High Performance Computing Techniques

    SciTech Connect (OSTI)

    Chen, Yousu; Glaesemann, Kurt R.; Rice, Mark J.; Huang, Zhenyu

    2015-12-31

    Power system simulation tools are traditionally developed in sequential mode and codes are optimized for single core computing only. However, the increasing complexity in the power grid models requires more intensive computation. The traditional simulation tools will soon not be able to meet the grid operation requirements. Therefore, power system simulation tools need to evolve accordingly to provide faster and better results for grid operations. This paper presents an integrated state estimation and contingency analysis software implementation using high performance computing techniques. The software is able to solve large size state estimation problems within one second and achieve a near-linear speedup of 9,800 with 10,000 cores for contingency analysis application. The performance evaluation is presented to show its effectiveness.

  6. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM Transmittal Letter and Attachment Final.pdf (406.93 KB) More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  7. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    SciTech Connect (OSTI)

    Custer, W.R. Jr.; Messick, C.D.

    1996-03-31

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

  8. Estimating dispersion from a tornado vortex and mesocyclone

    SciTech Connect (OSTI)

    Weber, A.H.; Hunter, C.H.

    1996-06-01

    Atmospheric dispersion modeling is required to ensure that a postulated breach in radionuclide storage containers at the Savannah River Site (SRS) from a tornado strike of Fujita-scale intensity F2 or higher will not result in an unacceptable dose to individuals. Fujita-scale tornado descriptions are included in Appendix A of this report. Dispersion models previously used at SRS for estimating dispersion following a tornado strike were developed by D.W. Pepper in 1975 (DP-1387, Dispersion of Small Particles) and H.R. Haynes and D.W. Taylor in 1983 (DPST-82-982, Estimating Doses from Tornado Winds). Research conducted in 1983 on the formation and evolution of tornadic thunderstorms has lead to a more complete understanding of the tornado vortex and associated persistent updraft and downdraft regions within the parent thunderstorm. To ensure that appropriate, contemporary methods are used for safety analysis, the Pepper model and the Haynes and Taylor model were evaluated with respect to current knowledge of circulations within tornadic thunderstorms. Pepper`s model is complex numerically but contains most of the desired physical parameterizations. Haynes and Taylor`s model is used with the Puff-Plume model (an emergency response model on the Weather INformation and Display System at SRS) and has provisions for radionuclide deposition and rainout. Haynes and Taylor assumed heavy rain following the tornado for a period of ten minutes, followed by a lighter rain for another ten minutes, then no rain for the period when the material is transported to 100 km downwind. However, neither model incorporates the effects of a nearby thunderstorm downdraft.

  9. Entry Requirements | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Us / Entry Requirements Entry Requirements Identification and/or Citizenship Requirements When you arrive for your visit, please be prepared to provide us a form of government photo identification such as your driver's license or U.S. passport when you check in with Visitor Services. And, if you are an uncleared visitor - meaning you do not hold a federal security clearance - you will also be asked to complete some documentation to certify your U.S. citizenship. Once all of these procedures and

  10. HTGR Industrial Application Functional and Operational Requirements

    SciTech Connect (OSTI)

    L. E. Demick

    2010-08-01

    This document specifies the functional and performance requirements to be used in the development of the conceptual design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to a typical industrial facility. These requirements were developed from collaboration with industry and HTGR suppliers over the preceding three years to identify the energy needs of industrial processes for which the HTGR technology is technically and economically viable. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a conceptual design of the plant that will serve the broadest range of industrial applications.

  11. Optical manufacturing requirements for an AVLIS plant

    SciTech Connect (OSTI)

    Primdahl, K.; Chow, R.; Taylor, J.R.

    1997-07-14

    A uranium enrichment plant utilizing Atomic Vapor Laser Isotope Separation (AVLIS) technology is currently being planned. Deployment of the Plant will require tens of thousands of commercial and custom optical components and subsystems. The Plant optical system will be expected to perform at a high level of optical efficiency and reliability in a high-average-power-laser production environment. During construction, demand for this large number of optics must be coordinated with the manufacturing capacity of the optical industry. The general requirements and approach to ensure supply of optical components is described. Dynamic planning and a closely coupled relationship with the optics industry will be required to control cost, schedule, and quality.

  12. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  13. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  14. Quality Assurance Source Requirements Traceability Database

    SciTech Connect (OSTI)

    MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

    2006-01-30

    At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

  15. Smart gun technology requirements preliminary report

    SciTech Connect (OSTI)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  16. TWRS configuration management requirement source document

    SciTech Connect (OSTI)

    Vann, J.M.

    1997-09-17

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made.

  17. Fuel Reformation: Catalyst Requirements in Microchannel Architectures

    SciTech Connect (OSTI)

    King, David L.; Brooks, Kriston P.; Fischer, Christopher M.; Pederson, Larry R.; Rawlings, Gregg C.; Stenkamp, Victoria S.; TeGrotenhuis, Ward E.; Wegeng, Robert S.; Whyatt, Greg A.

    2005-09-06

    Microchannel reactors have unique capabilities for onboard hydrocarbon fuel processing, due to their ability to provide process intensification through high heat and mass transfer, leading to smaller and more efficient reactors. The catalyst requirements in microchannel devices are demanding, requiring high activity, very low deactivation rates, and strong adherence to engineered substrate. Each unit operation benefits from microchannel architecture: the steam reforming reactor removes heat transfer limitations, allowing the catalyst to operate at elevated temperatures at the kinetic limit; the water gas shift reactor uses unique temperature control to reduce catalyst volume requirements; the PROX reactor provides high CO conversion and minimizes H2 oxidation through effective control of reactor temperature.

  18. Microsphere estimates of blood flow: Methodological considerations

    SciTech Connect (OSTI)

    von Ritter, C.; Hinder, R.A.; Womack, W.; Bauerfeind, P.; Fimmel, C.J.; Kvietys, P.R.; Granger, D.N.; Blum, A.L. Louisianna State Univ. Medical Center, Shreveport Universitaire Vaudois )

    1988-02-01

    The microsphere technique is a standard method for measuring blood flow in experimental animals. Sporadic reports have appeared outlining the limitations of this method. In this study the authors have systematically assessed the effect of blood withdrawals for reference sampling, microsphere numbers, and anesthesia on blood flow estimates using radioactive microspheres in dogs. Experiments were performed on 18 conscious and 12 anesthetized dogs. Four blood flow estimates were performed over 120 min using 1 {times} 10{sup 6} microspheres each time. The effects of excessive numbers of microspheres pentobarbital sodium anesthesia, and replacement of volume loss for reference samples with dextran 70 were assessed. In both conscious and anesthetized dogs a progressive decrease in gastric mucosal blood flow and cardiac output was observed over 120 min. This was also observed in the pancreas in conscious dogs. The major factor responsible for these changes was the volume loss due to the reference sample withdrawals. Replacement of the withdrawn blood with dextran 70 led to stable blood flows to all organs. The injection of excessive numbers of microspheres did not modify hemodynamics to a greater extent than did the injection of 4 million microspheres. Anesthesia exerted no influence on blood flow other than raising coronary flow. The authors conclude that although blood flow to the gastric mucosa and the pancreas is sensitive to the minor hemodynamic changes associated with the microsphere technique, replacement of volume loss for reference samples ensures stable blood flow to all organs over a 120-min period.

  19. Estimates of Savings Achievable from Irrigation Controller

    SciTech Connect (OSTI)

    Williams, Alison; Fuchs, Heidi; Whitehead, Camilla Dunham

    2014-03-28

    This paper performs a literature review and meta-analysis of water savings from several types of advanced irrigation controllers: rain sensors (RS), weather-based irrigation controllers (WBIC), and soil moisture sensors (SMS).The purpose of this work is to derive average water savings per controller type, based to the extent possible on all available data. After a preliminary data scrubbing, we utilized a series of analytical filters to develop our best estimate of average savings. We applied filters to remove data that might bias the sample such as data self-reported by manufacturers, data resulting from studies focusing on high-water users, or data presented in a non-comparable format such as based on total household water use instead of outdoor water use. Because the resulting number of studies was too small to be statistically significant when broken down by controller type, this paper represents a survey and synthesis of available data rather than a definitive statement regarding whether the estimated water savings are representative.

  20. Risk Estimation Methodology for Launch Accidents.

    SciTech Connect (OSTI)

    Clayton, Daniel James; Lipinski, Ronald J.; Bechtel, Ryan D.

    2014-02-01

    As compact and light weight power sources with reliable, long lives, Radioisotope Power Systems (RPSs) have made space missions to explore the solar system possible. Due to the hazardous material that can be released during a launch accident, the potential health risk of an accident must be quantified, so that appropriate launch approval decisions can be made. One part of the risk estimation involves modeling the response of the RPS to potential accident environments. Due to the complexity of modeling the full RPS response deterministically on dynamic variables, the evaluation is performed in a stochastic manner with a Monte Carlo simulation. The potential consequences can be determined by modeling the transport of the hazardous material in the environment and in human biological pathways. The consequence analysis results are summed and weighted by appropriate likelihood values to give a collection of probabilistic results for the estimation of the potential health risk. This information is used to guide RPS designs, spacecraft designs, mission architecture, or launch procedures to potentially reduce the risk, as well as to inform decision makers of the potential health risks resulting from the use of RPSs for space missions.

  1. Power plant capital investment cost estimates: current trends and sensitivity to economic parameters

    SciTech Connect (OSTI)

    Not Available

    1980-06-01

    This report describes power plant capital investment cost studies that were carried out as part of the activities of the Plans and Analysis Division, Office of Nuclear Energy Programs, US Department of Energy. The activities include investment cost studies prepared by an architect-engineer, including trends, effects of environmental and safety requirements, and construction schedules. A computer code used to prepare capital investment cost estimates under varying economic conditions is described, and application of this code is demonstrated by sensitivity studies.

  2. Estimated costs of ventilation systems complying with the HUD ventilation standard for manufactured homes

    SciTech Connect (OSTI)

    Miller, J.D.; Conner, C.C.

    1993-11-01

    At the request of the US Department of Housing and Urban Development (HUD), the Pacific Northwest Laboratory estimated the material, labor, and operating costs for ventilation equipment needed for compliance with HUD`s proposed revision to the ventilation standard for manufactured housing. This was intended to bound the financial impacts of the ventilation standard revision. Researchers evaluated five possible prototype ventilation systems that met the proposed ventilation requirements. Of those five, two systems were determined to be the most likely used by housing manufacturers: System 1 combines a fresh air duct with the existing central forced-air system to supply and circulate fresh air to conditioned spaces. System 2 uses a separate exhaust fan to remove air from the manufactured home. The estimated material and labor costs for these two systems range from $200 to $300 per home. Annual operating costs for the two ventilation systems were estimated for 20 US cities. The estimated operating costs for System 1 ranged from $55/year in Las Vegas, Nevada, to $83/year in Bismarck, North Dakota. Operating costs for System 2 ranged from a low of $35/year in Las Vegas to $63/year in Bismarck. Thus, HUD`s proposed increase in ventilation requirements will add less than $100/year to the energy cost of a manufactured home.

  3. Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual

    SciTech Connect (OSTI)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

  4. Automotive Turbocharging: Industrial Requirements and Technology Developments

    Broader source: Energy.gov [DOE]

    Significant improvements in turbocharger performance will be difficult to achieve requires a proper understanding of the trade-offs and engine effects and impacts must be part of turbocharger development

  5. San Bernardino County- Green Building Requirement

    Broader source: Energy.gov [DOE]

    In August 2007, the San Bernardino County Board of Supervisors approved a policy requiring that all new county buildings and major renovations be built to LEED Silver standards. The decision was...

  6. Guam- Solar-Ready Residential Building Requirement

    Broader source: Energy.gov [DOE]

    The Guam Energy Code, which became effective in October of 2000, requires that piping stub outs be provided for water heaters installed in low-rise residential buildings to enable the future inst...

  7. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  8. Energy Efficiency Requirements for State Government

    Broader source: Energy.gov [DOE]

    Public Act No. 07-242 of 2007 established mandatory efficiency requirements for certain equipment purchased by the state. The Connecticut Department of Administrative Services and agencies with p...

  9. Part V: Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DE-AC36-08GO28308 Modification M801 Section H - Page 2 of 50 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries...

  10. Gas Test Loop Functional and Technical Requirements

    SciTech Connect (OSTI)

    Glen R. Longhurst; Soli T. Khericha; James L. Jones

    2004-09-01

    This document defines the technical and functional requirements for a gas test loop (GTL) to be constructed for the purpose of providing a high intensity fast-flux irradiation environment for developers of advanced concept nuclear reactors. This capability is needed to meet fuels and materials testing requirements of the designers of Generation IV (GEN IV) reactors and other programs within the purview of the Advanced Fuel Cycle Initiative (AFCI). Space nuclear power development programs may also benefit by the services the GTL will offer. The overall GTL technical objective is to provide developers with the means for investigating and qualifying fuels and materials needed for advanced reactor concepts. The testing environment includes a fast-flux neutron spectrum of sufficient intensity to perform accelerated irradiation testing. Appropriate irradiation temperature, gaseous environment, test volume, diagnostics, and access and handling features are also needed. This document serves to identify those requirements as well as generic requirements applicable to any system of this kind.

  11. EPA State Manifest Requirements | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: EPA State Manifest RequirementsLegal Abstract Provided by the EPA, this website provides...

  12. Quality Assurance - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    services meet or exceed customers' requirements and expectations. Cancels DOE O 414.1C. Adm Chg 1, 5-8-13 o414.1d4-25-11.pdf -- PDF Document, 243 KB Writer: Colette Broussard...

  13. NERSC HPC Program Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 NERSC-NP2017FINAL.pdf | Adobe Acrobat PDF file ...

  14. Deepwater Offshore Wind Technology Research Requirements (Poster)

    SciTech Connect (OSTI)

    Musial, W.

    2005-05-01

    A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

  15. Technical requirements specification for tank waste retrieval

    SciTech Connect (OSTI)

    Lamberd, D.L.

    1996-09-26

    This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

  16. Energy Star Procurement Requirement for Agencies

    Broader source: Energy.gov [DOE]

    SB 2300 was enacted June 25, 2009 and later codified into law. It requires future office equipment, appliances, lighting, and heating and cooling products and systems purchased by and for the state...

  17. Alt Text Requirements for Web Images

    Office of Energy Efficiency and Renewable Energy (EERE)

    Per Section 508 requirements, images on Office of Energy Efficiency and Renewable Energy (EERE) websites and applications must have alt text. Alt text describes what an image looks like in words, making it accessible to screen readers.

  18. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    the system in support of Federal Personnel. 2. General Requirements 2.1 Capacity- The Web-Based Reporting System shall have the capacity to contain all documents, including task ...

  19. OUO Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OUO Review Requirement OUO Review Requirement Who can decide whether a document contains OUO information? In certain cases, the Office of Classification or your program office has already made the OUO decision for you. These decisions are found in classification guides, Unclassified Controlled Nuclear Information (UCNI) guidelines, or in program-issued OUO guidance. If a topic in such guidance indicates that information in your document is OUO, then the document contains OUO information. Some

  20. Individual Reporting Requirements | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Individual Reporting Requirements DOE Order 472.2, Personnel Security, sets forth reporting requirements for all DOE employees, contractors, and others involved in applying for or holding a DOE access authorization. Reporting must be done verbally within two business days of the event followed by a written confirmation within three additional business days to the Office of Personnel and Facility Clearances and Classification (OPFCC), to include: Legal action effected

  1. Requirements for Samples | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Samples Requirements for Samples This presentation by James Fenton was given at the High Temperature Membrane Working Group Meeting in October 10, 2007 in Washington, D.C. htmwg_oct07_fenton_samples.pdf (134.79 KB) More Documents & Publications In-Plane Conductivity Testing Procedures and Results In Plane Conductivity Testing, BekkTech LLC Procedure for Performing In-Plane Membrane Conductivity Testing

  2. Requirements for CEC POP machine protection system

    SciTech Connect (OSTI)

    Pinayev, I.

    2015-02-18

    The requirements of CEC POP machine protection system are meant to prevent damage to a vacuum chamber by a missteered electron beam. In this example, beam energy = 22 MeV, Maximal bunch charge = 5 nC, Maximal repetition rate = 78 kHz, Normalized emittance = 5 mm mrad, Minimal β-function = 1 m. From this information the requirements of the protection system can be calculated by factoring the information into equations to find beam densities and temperature excursions.

  3. Training and Required Reading Management Tool

    Energy Science and Technology Software Center (OSTI)

    2009-08-13

    This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

  4. Home - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages

    Personal tools Log in Site Map | Contact Us | Help U.S. Department of Energy Office of Management Current Documents Archived Documents Entire Site Search Site Search only in current section Advanced Search Home Directives Delegations Other Requirements RevCom DPC Resources Directives Tools References Delegation Procedures Archives help Help Directives, Delegations, and Other Requirements Directives Directives All current, archived and draft Directives Delegations Delegations Legal instrument

  5. Goals and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goals and Requirements Goals and Requirements The U.S. Department of Energy's (DOE) Sustainability Performance Office (SPO) oversees departmental compliance with goals outlined in Executive Order (E.O.) 13693, Planning for Sustainability in the Next Decade, and related statutes. Issued on March 19, 2015, E.O. 13693 revokes E.O.s 13514 and 13423, while setting reduction targets for energy use intensity, water use intensity, and greenhouse gas emissions and prescribing other sustainability goals

  6. Directives Help - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Help by Website Administrator All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a number of ways in which you may get to the information you need. Navigating the DOE Directives, Delegations, and Requirements Portal A guide for using the new portal is available here. Navigation Tools The links at the top of the page will take you to the major elements of the site--directives, delegations and requirements. The

  7. Visitor Security Requirements | Savannah River Ecology Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visitor Security Requirements NOTE: These requirements do not apply to events held at the SREL Conference Center, which is located outside the security barricade. Before you arrive: I. Obtaining a visitor's badge II. Prohibited articles III. Electronics policy IV. Vehicle inspections When you arrive: Proceed to the badge office (map). Present two forms of identification from the list of acceptable documents, including one photo ID, to receive your badge. You will not receive a badge without

  8. JLab Registration/International Services - Training Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Special Note for High School and Undergraduate Students Click Here All High School Studenta and Undergraduate students must also complete the Student Safety and Security Training prior to gaining access to work areas. This course cannot be taken online. Contact the Science Education Office (education@jlab.org) to schedule this training. Training Requirements In order to provide a safe and secure place to work, Jefferson Lab requires all individuals to complete training courses which are designed

  9. Justification Memoranda - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Justification Memoranda by Diane Johnson Notice of Intent to Revise Department of Energy Order 350.1, Contractor Human Resources Management Program - by Robert Myers - last modified Jun 19, 2014 11:17 AM DOE O 350.1 establishes responsibilities, requirements, and cost allow-ability criteria for the management an oversight of contractor human resource management programs, is being revised to remove contractor requirements from Chapter IV, Compensation, Chapter V, Benefits, and Chapter VI Pensions

  10. Hanford analytical services quality assurance requirements documents

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  11. Present and Future Computing Requirements for PETSc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Future Computing Requirements for PETSc Jed Brown jedbrown@mcs.anl.gov Mathematics and Computer Science Division, Argonne National Laboratory Department of Computer Science, University of Colorado Boulder NERSC ASCR Requirements for 2017 2014-01-15 Extending PETSc's Hierarchically Nested Solvers ANL Lois C. McInnes, Barry Smith, Jed Brown, Satish Balay UChicago Matt Knepley IIT Hong Zhang LBL Mark Adams Linear solvers, nonlinear solvers, time integrators, optimization methods (merged TAO)

  12. NBP RFI: Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This paper has two objectives: 1) Define the need for dedicated wireless spectrum for Utilities. 2) Provide information to support Utilities' communication needs. NBP RFI: Communications Requirements (401.84 KB) More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the

  13. Deficiency tracking system, conceptual business process requirements

    SciTech Connect (OSTI)

    Hermanson, M.L.

    1997-04-18

    The purpose of this document is to describe the conceptual business process requirements of a single, site-wide, consolidated, automated, deficiency management tracking, trending, and reporting system. This description will be used as the basis for the determination of the automated system acquisition strategy including the further definition of specific requirements, a ''make or buy'' determination and the development of specific software design details.

  14. CRAD, Facility Safety - Unreviewed Safety Question Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Facility Safety - Unreviewed Safety Question Requirements CRAD, Facility Safety - Unreviewed Safety Question Requirements A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Unreviewed Safety Question (USQ) process.. CRADs provide a recommended approach and the types of information to

  15. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable

  16. Cyclotron Requirements for Multi-disciplinary Programs

    SciTech Connect (OSTI)

    Armbruster, John M.

    2009-03-10

    As time has passed, the various Cyclotron programs have changed over the years. In the ''early'' times of Cyclotron operations, the emphasis was on a more single sided approach such as Clinical or Research or Production. However, as time passed, the disciplines became more interconnected until today, it is unusual to have a Cyclotron and only have a single program unless it is pure production. More and more, especially in public areas such as Universities or Health Centers, you are seeing programs that do all three types of disciplines: Production; Clinical or Patient Diagnostics and/or Treatment; and Research, either in the development and manufacture of new Radio-Isotopes, new Diagnostic or Therapeutic Compound Development, or Clinical Research involving subject testing. While all three of these disciplines have some common requirements, they also have some very different requirements that may be completely counterproductive to other requirements. For a program where all three disciplines are required to be successful, it is necessary come up with some sort of compromise that meets all the various requirements. During this talk, we will try to identify some of these different requirements for the various disciplines and how these could impact the other disciplines. We will also discuss ideas for some possible compromises that might reduce the conflict between the various disciplines.

  17. Pension_Estimate_System-PIA.pdf

    Energy Savers [EERE]

    Pay for Clean Energy Pay for Clean Energy PCEE.png Transitioning to a clean energy economy requires innovative financing solutions that enable state, local, and tribal governments to invest in clean energy technologies. However, the clean energy puzzle can be daunting, especially when it comes to paying for clean energy efforts. The resources available here aim to provide an overview of financing for state, local, and tribal governments who are designing and implementing clean energy financing

  18. Estimating Terrorist Risk with Possibility Theory

    SciTech Connect (OSTI)

    J.L. Darby

    2004-11-30

    This report summarizes techniques that use possibility theory to estimate the risk of terrorist acts. These techniques were developed under the sponsorship of the Department of Homeland Security (DHS) as part of the National Infrastructure Simulation Analysis Center (NISAC) project. The techniques have been used to estimate the risk of various terrorist scenarios to support NISAC analyses during 2004. The techniques are based on the Logic Evolved Decision (LED) methodology developed over the past few years by Terry Bott and Steve Eisenhawer at LANL. [LED] The LED methodology involves the use of fuzzy sets, possibility theory, and approximate reasoning. LED captures the uncertainty due to vagueness and imprecision that is inherent in the fidelity of the information available for terrorist acts; probability theory cannot capture these uncertainties. This report does not address the philosophy supporting the development of nonprobabilistic approaches, and it does not discuss possibility theory in detail. The references provide a detailed discussion of these subjects. [Shafer] [Klir and Yuan] [Dubois and Prade] Suffice to say that these approaches were developed to address types of uncertainty that cannot be addressed by a probability measure. An earlier report discussed in detail the problems with using a probability measure to evaluate terrorist risk. [Darby Methodology]. Two related techniques are discussed in this report: (1) a numerical technique, and (2) a linguistic technique. The numerical technique uses traditional possibility theory applied to crisp sets, while the linguistic technique applies possibility theory to fuzzy sets. Both of these techniques as applied to terrorist risk for NISAC applications are implemented in software called PossibleRisk. The techniques implemented in PossibleRisk were developed specifically for use in estimating terrorist risk for the NISAC program. The LEDTools code can be used to perform the same linguistic evaluation as

  19. LANL surveillance requirements management and surveillance requirements from NA-12 tasking memo

    SciTech Connect (OSTI)

    Hills, Charles R

    2011-01-25

    Surveillance briefing to NNSA to support a tasking memo from NA-12 on Surveillance requirements. This talk presents the process for developing surveillance requirements, discusses the LANL requirements that were issued as part of that tasking memo, and presents recommendations on Component Evaluation and Planning Committee activities for FY11.

  20. Estimating Alarm Thresholds for Process Monitoring Data under Different Assumptions about the Data Generating Mechanism

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Burr, Tom; Hamada, Michael S.; Howell, John; Skurikhin, Misha; Ticknor, Larry; Weaver, Brian

    2013-01-01

    Process monitoring (PM) for nuclear safeguards sometimes requires estimation of thresholds corresponding to small false alarm rates. Threshold estimation dates to the 1920s with the Shewhart control chart; however, because possible new roles for PM are being evaluated in nuclear safeguards, it is timely to consider modern model selection options in the context of threshold estimation. One of the possible new PM roles involves PM residuals, where a residual is defined as residual = data − prediction. This paper reviews alarm threshold estimation, introduces model selection options, and considers a range of assumptions regarding the data-generating mechanism for PM residuals.more » Two PM examples from nuclear safeguards are included to motivate the need for alarm threshold estimation. The first example involves mixtures of probability distributions that arise in solution monitoring, which is a common type of PM. The second example involves periodic partial cleanout of in-process inventory, leading to challenging structure in the time series of PM residuals.« less

  1. Methods for estimating wake flow and effluent dispersion near simple block-like buildings

    SciTech Connect (OSTI)

    Hosker, R.P. Jr.

    1981-05-01

    This report is intended as an interim guide for those who routinely face air quality problems associated with near-building exhaust stack placement and height, and the resulting concentration patterns. Available data and methods for estimating wake flow and effluent dispersion near isolated block-like structures are consolidated. The near-building and wake flows are described, and quantitative estimates for frontal eddy size, height and extent of roof and wake cavities, and far wake behavior are provided. Concentration calculation methods for upwind, near-building, and downwind pollutant sources are given. For an upwind source, it is possible to estimate the required stack height, and to place upper limits on the likely near-building concentration. The influences of near-building source location and characteristics relative to the building geometry and orientation are considered. Methods to estimate effective stack height, upper limits for concentration due to flush roof vents, and the effect of changes in rooftop stack height are summarized. Current wake and wake cavity models are presented. Numerous graphs of important expressions have been prepared to facilitate computations and quick estimates of flow patterns and concentration levels for specific simple buildings. Detailed recommendations for additional work are given.

  2. Estimated Water Flows in 2005: United States

    SciTech Connect (OSTI)

    Smith, C A; Belles, R D; Simon, A J

    2011-03-16

    Flow charts depicting water use in the United States have been constructed from publicly available data and estimates of water use patterns. Approximately 410,500 million gallons per day of water are managed throughout the United States for use in farming, power production, residential, commercial, and industrial applications. Water is obtained from four major resource classes: fresh surface-water, saline (ocean) surface-water, fresh groundwater and saline (brackish) groundwater. Water that is not consumed or evaporated during its use is returned to surface bodies of water. The flow patterns are represented in a compact 'visual atlas' of 52 state-level (all 50 states in addition to Puerto Rico and the Virgin Islands) and one national water flow chart representing a comprehensive systems view of national water resources, use, and disposition.

  3. New developments in capital cost estimating

    SciTech Connect (OSTI)

    Stutz, R.A.; Zocher, M.A.

    1988-01-01

    The new developments in cost engineering revolve around the ability to capture information that in the past could not be automated. The purpose of automation is not to eliminate the expert cost engineer. The goal is to use available technology to have more information available to the professionals in the cost engineering field. In that sense, the demand for expertise increases in order to produce the highest quality estimate and project possible from all levels of cost engineers. We cannot overemphasize the importance of using a good source of expert information in building these types of programs. ''Garbage in, garbage out'' still applies in this form of programming. Expert systems technology will become commonplace in many vertical markets; it is important to undersand what can and cannot be accomplished in our field, and where this technology will lead us in the future.

  4. Chapter 17: Estimating Net Savings: Common Practices

    SciTech Connect (OSTI)

    Violette, D. M.; Rathbun, P.

    2014-09-01

    This chapter focuses on the methods used to estimate net energy savings in evaluation, measurement, and verification (EM&V) studies for energy efficiency (EE) programs. The chapter provides a definition of net savings, which remains an unsettled topic both within the EE evaluation community and across the broader public policy evaluation community, particularly in the context of attribution of savings to particular program. The chapter differs from the measure-specific Uniform Methods Project (UMP) chapters in both its approach and work product. Unlike other UMP resources that provide recommended protocols for determining gross energy savings, this chapter describes and compares the current industry practices for determining net energy savings, but does not prescribe particular methods.

  5. FUZZY SUPERNOVA TEMPLATES. II. PARAMETER ESTIMATION

    SciTech Connect (OSTI)

    Rodney, Steven A.; Tonry, John L. E-mail: jt@ifa.hawaii.ed

    2010-05-20

    Wide-field surveys will soon be discovering Type Ia supernovae (SNe) at rates of several thousand per year. Spectroscopic follow-up can only scratch the surface for such enormous samples, so these extensive data sets will only be useful to the extent that they can be characterized by the survey photometry alone. In a companion paper we introduced the Supernova Ontology with Fuzzy Templates (SOFT) method for analyzing SNe using direct comparison to template light curves, and demonstrated its application for photometric SN classification. In this work we extend the SOFT method to derive estimates of redshift and luminosity distance for Type Ia SNe, using light curves from the Sloan Digital Sky Survey (SDSS) and Supernova Legacy Survey (SNLS) as a validation set. Redshifts determined by SOFT using light curves alone are consistent with spectroscopic redshifts, showing an rms scatter in the residuals of rms{sub z} = 0.051. SOFT can also derive simultaneous redshift and distance estimates, yielding results that are consistent with the currently favored {Lambda}CDM cosmological model. When SOFT is given spectroscopic information for SN classification and redshift priors, the rms scatter in Hubble diagram residuals is 0.18 mag for the SDSS data and 0.28 mag for the SNLS objects. Without access to any spectroscopic information, and even without any redshift priors from host galaxy photometry, SOFT can still measure reliable redshifts and distances, with an increase in the Hubble residuals to 0.37 mag for the combined SDSS and SNLS data set. Using Monte Carlo simulations, we predict that SOFT will be able to improve constraints on time-variable dark energy models by a factor of 2-3 with each new generation of large-scale SN surveys.

  6. Property:EstimatedCostLowUSD | Open Energy Information

    Open Energy Info (EERE)

    Name EstimatedCostLowUSD Property Type Quantity Description the low estimate of cost in USD Use this type to express a monetary value in US Dollars. The default unit is one...

  7. Property:EstimatedCostHighUSD | Open Energy Information

    Open Energy Info (EERE)

    Name EstimatedCostHighUSD Property Type Quantity Description the high estimate of cost in USD Use this type to express a monetary value in US Dollars. The default unit is one...

  8. Property:EstimatedCostMedianUSD | Open Energy Information

    Open Energy Info (EERE)

    Name EstimatedCostMedianUSD Property Type Quantity Description the median estimate of cost in USD Use this type to express a monetary value in US Dollars. The default unit is one...

  9. Microsoft PowerPoint - 15.1615_Cost Estimating Panel

    Energy Savers [EERE]

    Cost Estimate (ICE) - Same Basis as Project Cost Estimate (PCE) Sa e as s as ojec Cos s a e ( C ) - Reconcilable with PCE to Facilitate Validation * Independent Cost Review...

  10. The ARM Best Estimate Station-based Surface (ARMBESTNS) Data...

    Office of Scientific and Technical Information (OSTI)

    Station-based Surface (ARMBESTNS) Data set Title: The ARM Best Estimate Station-based Surface (ARMBESTNS) Data set The ARM Best Estimate Station-based Surface (ARMBESTNS) data set ...

  11. ARM Climate Modeling Best Estimate Data - A new data product...

    Office of Scientific and Technical Information (OSTI)

    ARM Climate Modeling Best Estimate Data - A new data product for climate modelers Citation Details In-Document Search Title: ARM Climate Modeling Best Estimate Data - A new data ...

  12. Energy and crude oil input requirements for the production of reformulated gasolines

    SciTech Connect (OSTI)

    Singh, M.; McNutt, B.

    1993-10-01

    The energy and crude oil requirements for the production of reformulated gasoline (RFG) are estimated. The scope of the study includes both the energy and crude oil embodied in the final product and the process energy required to manufacture the RFG and its components. The effects on energy and crude oil use of employing various oxygenates to meet the minimum oxygen-content level required by the Clean Air Act Amendments are evaluated. The analysis shows that production of RFG requires more total energy, but uses less crude oil, than that of conventional gasoline. The energy and crude oil use requirements of the different RFGs vary considerably. For the same emissions performance level, RFG with ethanol requires substantially more total energy and crude oil than does RFG with methyl tertiary butyl ether (MTBE) or ethyl tertiary butyl ether. A specific proposal by the US Environmental Protection Agency, designed to allow the use of ethanol in RFG, would increase the total energy required to produce RFG by 2% and the total crude oil required by 2.0 to 2.5% over the corresponding values for the base RFG with MTBE.

  13. Energy and crude oil input requirements for the production of reformulated gasolines

    SciTech Connect (OSTI)

    Singh, M.; McNutt, B.

    1993-11-01

    The energy and crude oil requirements for the production of reformulated gasolines (RFG) are estimated. Both the energy and crude oil embodied in the final product and the process energy required to manufacture the RFG and its components are included. The effects on energy and crude oil use of using various oxygenates to meet the minimum oxygen content level required by the Clean Air Act Amendments are evaluated. The analysis illustrates that production of RFG requires more total energy than that of conventional gasoline but uses less crude oil. The energy and crude oil use requirements of the different RFGs vary considerably. For the same emissions performance level, RFG with ethanol requires substantially more total energy and crude oil than RFG with MTBE or ETBE. A specific proposal by the EPA designed to allow the use of ethanol in RFG would increase the total energy required to produce RFG by 2% and the total crude oil required by 2.0 to 2.5% over that for the base RFG with MTBE.

  14. Guidelines for Estimating Unmetered Industrial Water Use | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Industrial Water Use Guidelines for Estimating Unmetered Industrial Water Use Document describes a systematic approach to estimate industrial water use in evaporative cooling systems, steam boiler systems, and facility wash applications. It assists Federal agencies in the baseline development by providing a methodology to calculate unmetered sources of industrial water use utilizing engineering estimates. Download the Guidelines for Estimating Unmetered Industrial Water Use. (2.11 MB)

  15. Estimating Motor Efficiency in the Field | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Estimating Motor Efficiency in the Field Estimating Motor Efficiency in the Field Some utility companies and public agencies offer rebates to encourage customers to upgrade their existing standard efficiency motors to premium efficiency motors. It is important to know the efficiency of the existing motor and how it is being used to accurately estimate potential annual energy and dollar savings. This tip sheet provides suggested actions and estimates of savings from improved efficiency. Motor

  16. Estimating Appliance and Home Electronic Energy Use | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity & Fuel » Appliances & Electronics » Estimating Appliance and Home Electronic Energy Use Estimating Appliance and Home Electronic Energy Use Our appliance and electronic energy use calculator allows you to estimate your annual energy use and cost to operate specific products. The wattage values provided are samples only; actual wattage of products varies depending on product age and features. Enter a wattage value for your own product for the most accurate estimate. Wattage

  17. Buildings Greenhouse Gas Mitigation Estimator Worksheet | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Buildings Greenhouse Gas Mitigation Estimator Worksheet Buildings Greenhouse Gas Mitigation Estimator Worksheet Excel tool helps agencies estimate the greenhouse gas (GHG) mitigation reduction from implementing energy efficiency measures across a portfolio of buildings. It is designed to be applied to groups of office buildings. For example, at a program level (regional or site) that can be summarized at the agency level. While the default savings and cost estimates apply to office

  18. Estimation of landfill emission lifespan using process oriented modeling

    SciTech Connect (OSTI)

    Ustohalova, Veronika . E-mail: veronika.ustohalova@uni-essen.de; Ricken, Tim; Widmann, Renatus

    2006-07-01

    Depending on the particular pollutants emitted, landfills may require service activities lasting from hundreds to thousands of years. Flexible tools allowing long-term predictions of emissions are of key importance to determine the nature and expected duration of maintenance and post-closure activities. A highly capable option represents predictions based on models and verified by experiments that are fast, flexible and allow for the comparison of various possible operation scenarios in order to find the most appropriate one. The intention of the presented work was to develop a experimentally verified multi-dimensional predictive model capable of quantifying and estimating processes taking place in landfill sites where coupled process description allows precise time and space resolution. This constitutive 2-dimensional model is based on the macromechanical theory of porous media (TPM) for a saturated thermo-elastic porous body. The model was used to simulate simultaneously occurring processes: organic phase transition, gas emissions, heat transport, and settlement behavior on a long time scale for municipal solid waste deposited in a landfill. The relationships between the properties (composition, pore structure) of a landfill and the conversion and multi-phase transport phenomena inside it were experimentally determined. In this paper, we present both the theoretical background of the model and the results of the simulations at one single point as well as in a vertical landfill cross section.

  19. A method for determining the spent-fuel contribution to transport cask containment requirements

    SciTech Connect (OSTI)

    Sanders, T.L.; Seager, K.D.; Rashid, Y.R.; Barrett, P.R.; Malinauskas, A.P.; Einziger, R.E.; Jordan, H.; Duffey, T.A.; Sutherland, S.H.; Reardon, P.C.

    1992-11-01

    This report examines containment requirements for spent-fuel transport containers that are transported under normal and hypothetical accident conditions. A methodology is described that estimates the probability of rod failure and the quantity of radioactive material released from breached rods. This methodology characterizes the dynamic environment of the cask and its contents and deterministically models the peak stresses that are induced in spent-fuel cladding by the mechanical and thermal dynamic environments. The peak stresses are evaluated in relation to probabilistic failure criteria for generated or preexisting ductile tearing and material fractures at cracks partially through the wall in fuel rods. Activity concentrations in the cask cavity are predicted from estimates of the fraction of gases, volatiles, and fuel fines that are released when the rod cladding is breached. Containment requirements based on the source term are calculated in terms of maximum permissible volumetric leak rates from the cask. Calculations are included for representative cask designs.

  20. FES Science Network Requirements - Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008

    SciTech Connect (OSTI)

    Tierney, Brian; Dart, Eli; Tierney, Brian

    2008-07-10

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In March 2008, ESnet and the Fusion Energy Sciences (FES) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the FES Program Office. Most sites that conduct data-intensive activities (the Tokamaks at GA and MIT, the supercomputer centers at NERSC and ORNL) show a need for on the order of 10 Gbps of network bandwidth for FES-related work within 5 years. PPPL reported a need for 8 times that (80 Gbps) in that time frame. Estimates for the 5-10 year time period are up to 160 Mbps for large simulations. Bandwidth requirements for ITER range from 10 to 80 Gbps. In terms of science process and collaboration structure, it is clear that the proposed Fusion Simulation Project (FSP) has the potential to significantly impact the data movement patterns and therefore the network requirements for U.S. fusion science. As the FSP is defined over the next two years, these changes will become clearer. Also, there is a clear and present unmet need for better network connectivity between U.S. FES sites and two Asian fusion experiments--the EAST Tokamak in China and the KSTAR Tokamak in South Korea. In addition to achieving its goal of collecting and characterizing the network requirements of the science endeavors funded by the FES Program Office, the workshop emphasized that there is a need for research into better ways of conducting remote

  1. Launch vehicle integration requirements for SP-100

    SciTech Connect (OSTI)

    Shaw, L.T. Jr.; Womack, J.R.

    1984-01-31

    SP-100 is the designation for a nuclear reactor-based power plant being developed for both civil and military missions beginning in the 1990s for such potential space applications as communication satellites, space radar, electric propulsion and space stations. Typically, a system using the SP-100 along with a selected upper stage system would be launched by the National Space Transportation System (NSTS) Space Shuttle System into a near-earth orbit, deployed, and through upper stage propulsion burn(s) be inserted/transferred to its mission orbit. The nature of the advanced design SP-100 gives rise to a set of issues that require special attention to assure that payloads using this power plant are physically and functionally compatible with the NSTS and meet the safety requirements thereof. The purpose of this document is to define and present the requirements and interface provisions that, when satisfied, will ensure technical compability between SP-100 systems and the NSTS.

  2. Advanced Scientific Computing Research Network Requirements

    SciTech Connect (OSTI)

    Bacon, Charles; Bell, Greg; Canon, Shane; Dart, Eli; Dattoria, Vince; Goodwin, Dave; Lee, Jason; Hicks, Susan; Holohan, Ed; Klasky, Scott; Lauzon, Carolyn; Rogers, Jim; Shipman, Galen; Skinner, David; Tierney, Brian

    2013-03-08

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 25 years. In October 2012, ESnet and the Office of Advanced Scientific Computing Research (ASCR) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the ASCR program office. The requirements identified at the review are summarized in the Findings section, and are described in more detail in the body of the report.

  3. MarFS-Requirements-Design-Configuration-Admin

    SciTech Connect (OSTI)

    Kettering, Brett Michael; Grider, Gary Alan

    2015-07-08

    This document will be organized into sections that are defined by the requirements for a file system that presents a near-POSIX (Portable Operating System Interface) interface to the user, but whose data is stored in whatever form is most efficient for the type of data being stored. After defining the requirement the design for meeting the requirement will be explained. Finally there will be sections on configuring and administering this file system. More and more, data dominates the computing world. There is a “sea” of data out there in many different formats that needs to be managed and used. “Mar” means “sea” in Spanish. Thus, this product is dubbed MarFS, a file system for a sea of data.

  4. Civilian Radioactive Waste Management System Requirements Document

    SciTech Connect (OSTI)

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  5. Technical requirements for bioassay support services

    SciTech Connect (OSTI)

    Hickman, D.P.; Anderson, A.L. )

    1991-05-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are also addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.

  6. HEP Science Network Requirements--Final Report

    SciTech Connect (OSTI)

    Bakken, Jon; Barczyk, Artur; Blatecky, Alan; Boehnlein, Amber; Carlson, Rich; Chekanov, Sergei; Cotter, Steve; Cottrell, Les; Crawford, Glen; Crawford, Matt; Dart, Eli; Dattoria, Vince; Ernst, Michael; Fisk, Ian; Gardner, Rob; Johnston, Bill; Kent, Steve; Lammel, Stephan; Loken, Stewart; Metzger, Joe; Mount, Richard; Ndousse-Fetter, Thomas; Newman, Harvey; Schopf, Jennifer; Sekine, Yukiko; Stone, Alan; Tierney, Brian; Tull, Craig; Zurawski, Jason

    2010-04-27

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity

  7. World nuclear fuel cycle requirements 1991

    SciTech Connect (OSTI)

    Not Available

    1991-10-10

    The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

  8. Requirements for status for volume fuel cell manufacturing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements & Status for Volume Fuel Cell Manufacturing DOE Hydrogen Program, Washington, DC July 13-14, 2005 Requirements for Manufactured Fuel Cells Customer Requirements: ...

  9. States with NEPA-like Environmental Planning Requirements | Department...

    Energy Savers [EERE]

    States with NEPA-like Environmental Planning Requirements States with NEPA-like Environmental Planning Requirements Several states have environmental planning requirements that are...

  10. Web Writing Requirements and Best Practices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Web Writing Requirements and Best Practices Web Writing Requirements and Best Practices The Office of Energy Efficiency and Renewable Energy (EERE) has requirements and best ...

  11. 2006 Final Transmission Proposal: Revenue Requirements Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the

  12. Ootw Tool Requirements in Relation to JWARS

    SciTech Connect (OSTI)

    Hartley III, D.S.; Packard, S.L.

    1998-01-01

    This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

  13. Best-Estimate Analysis PWR LOCA.

    Energy Science and Technology Software Center (OSTI)

    2005-11-11

    Version: 00 TRAC‑PF1 performs best estimate analyses of loss of coolant accidents and other transients in pressurized light water reactors. The program can also be used to model a wide range of thermal hydraulic experiments in reduced scale facilities. Models employed include reflood, multi‑dimensional two‑phase flow, nonequilibrium thermodynamics, generalized heat transfer, and reactor kinetics. Automatic steady‑state and dump/restart capabilities are provided. The changes reported in TRACNEWS issues through Number 7 are incorporated in this release.more » TRAC-PF1 was developed on a CDC computer at Los Alamos National Laboratory. The PC version of TRAC‑PF1 was converted at CNEN in 1989 and has not been updated since that time. The NRC no longer supports the TRAC codes. They currently develop and maintain the TRACE code system, which is the TRAC/RELAP Advanced Computational Engine. TRACE is a modernized thermal-hydraulics code designed to consolidate the capabilities of NRC's 3 legacy safety codes - TRAC-P, TRAC-B and RELAP. This is NRC's flagship thermal-hydraulics analysis tool. See the website for more information http://www.nrccodes.com/.« less

  14. Theoretical Estimate of Maximum Possible Nuclear Explosion

    DOE R&D Accomplishments [OSTI]

    Bethe, H. A.

    1950-01-31

    The maximum nuclear accident which could occur in a Na-cooled, Be moderated, Pu and power producing reactor is estimated theoretically. (T.R.H.) 2O82 Results of nuclear calculations for a variety of compositions of fast, heterogeneous, sodium-cooled, U-235-fueled, plutonium- and power-producing reactors are reported. Core compositions typical of plate-, pin-, or wire-type fuel elements and with uranium as metal, alloy, and oxide were considered. These compositions included atom ratios in the following range: U-23B to U-235 from 2 to 8; sodium to U-235 from 1.5 to 12; iron to U-235 from 5 to 18; and vanadium to U-235 from 11 to 33. Calculations were performed to determine the effect of lead and iron reflectors between the core and blanket. Both natural and depleted uranium were evaluated as the blanket fertile material. Reactors were compared on a basis of conversion ratio, specific power, and the product of both. The calculated results are in general agreement with the experimental results from fast reactor assemblies. An analysis of the effect of new cross-section values as they became available is included. (auth)

  15. CRAD, Facility Safety- Technical Safety Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Technical Safety Requirments (TSA).

  16. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE

    Broader source: Energy.gov [DOE]

    The Department has issued a Final Rule revising the existing contractor regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). One unusual aspect of the Final Rule is that it requires Contracting Officers to attempt to execute bilateral modifications to existing affected contracts to apply the Final Rule's revisions to those contracts. We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "… are designed to clarify and streamline existing requirements, improve efficiency of contractor legal management, and facilitate oversight over the expenditure of taxpayer dollars." The contract modifications will state the revisions will only apply to costs incurred from date the bilateral modifications are executed forward. The revisions are administrative in nature. Regarding costs contractors have not yet incurred, the revisions could have been communicated to contractors without using a Final Rule to incorporate them into current contracts. Consequently, the modifications do not require equitable adjustments.)

  17. Directives - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Directives Current Directives List Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors Current Draft Archives by Website Administrator More filters Less filters Directive Type Order Guide Manual Policy Notice Cancellation Notice HQ Order Sec of Energy Notice Justification Memorandum Certification Memo 0 Series Series All 0000 Subject Classification 100 Leadership/Management

  18. Requirements and Submission Process for Qualified Software

    Office of Energy Efficiency and Renewable Energy (EERE)

    These documents provide a complete list of requirements and submission details to have software qualified for calculating energy and power cost savings for commercial building tax deductions under tax code Section 179D for systems or buildings placed in service on or after January 1, 2016, or on or before December 31, 2015.

  19. FY 1998 waste information requirements document

    SciTech Connect (OSTI)

    Poppiti, J.A.

    1997-09-05

    The Waste Information Requirements Document describes the activities of the Tank Waste Remediation System (TWRS) Characterization Project that provide characterization information on Hanford Site waste tanks. The characterization information is required to perform operations and meet the commitments of TWRS end users. These commitments are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan to the Defense Nuclear Facilities Safety Board (DNFSB); and other directives as listed in Section 4.0. This Waste Information Requirement Document applies to Fiscal Years 1997 and 1998 activities. Its contents are based on the best information available in August 1997. The format and content are based on the directions of DOE-RL (Sieracki, 1997) and Fluor Daniel Hanford Incorporated (Umek, 1997). Activities, such as the revision of the Tank Characterization Technical Sampling Basis (Brown et al. 1997), the revision of the data quality objectives (DQOs), issue closures, discussions with Ecology, and management decisions may cause subsequent updates to the Waste Information Requirements Document.

  20. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.a. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is for an assisted acquisition. An assisted acquisition is a type of interagency acquisition where the servicing agency and requesting agency enter into a written interagency agreement pursuant to which the

  1. System requirements and design description for the environmental requirements management interface (ERMI)

    SciTech Connect (OSTI)

    Biebesheimer, E.

    1997-09-30

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC.

  2. Residential Lighting End-Use Consumption Study: Estimation Framework and Initial Estimates

    SciTech Connect (OSTI)

    Gifford, Will R.; Goldberg, Miriam L.; Tanimoto, Paulo M.; Celnicker, Dane R.; Poplawski, Michael E.

    2012-12-01

    The U.S. DOE Residential Lighting End-Use Consumption Study is an initiative of the U.S. Department of Energy’s (DOE’s) Solid-State Lighting Program that aims to improve the understanding of lighting energy usage in residential dwellings. The study has developed a regional estimation framework within a national sample design that allows for the estimation of lamp usage and energy consumption 1) nationally and by region of the United States, 2) by certain household characteristics, 3) by location within the home, 4) by certain lamp characteristics, and 5) by certain categorical cross-classifications (e.g., by dwelling type AND lamp type or fixture type AND control type).

  3. Long-Term Stewardship Science and Technology Requirements

    SciTech Connect (OSTI)

    McDonald, J.K.; Nickelson, R.A.

    2002-05-16

    To ensure technology developed for long-term stewardship will meet existing requirements, a review of requirements was performed. In addition to identifying existing science and technology related requirements, gaps and conflicts of requirements were identified.

  4. Long-term Stewardship Science and Technology Requirements

    SciTech Connect (OSTI)

    Mcdonald, Jaimee Kristen; Nickelson, Reva Anne

    2002-08-01

    To ensure technology developed for long-term stewardship will meet existing requirements, a review of requirements was performed. In addition to identifying existing science and technology related requirements, gaps and conflicts of requirements were identified.

  5. Template:ExplorationTechnique | Open Energy Information

    Open Energy Info (EERE)

    could provide EstimatedCostLowUSD - the estimated value only of the low end of the cost range (units described in CostUnit) EstimatedCostMedianUSD - the estimated value only...

  6. Template:ExplorationGroup | Open Energy Information

    Open Energy Info (EERE)

    could provide EstimatedCostLowUSD - the estimated value only of the low end of the cost range (units described in CostUnit) EstimatedCostMedianUSD - the estimated value only...

  7. Non Invasive estimation of aluminum concentration in Hall-Heroult reduction cells

    SciTech Connect (OSTI)

    David Bell

    2004-03-01

    The present best practice for the preparation of primary aluminum is by electrolysis of alumina in the traditional Hall-Heroult reduction cell. The process conditions in the electrolyte of this cell required for the reduction to proceed are sufficiently harsh to have precluded the implementation of in situ sensing of the electrolyte composition, specifically the concentration of the ionized alumina. This report reveals the theoretical basis for a non-invasive method for estimation of the ionized alumina concentration which does not require the use of any sensor in direct contact with the cell electrolyte. The proposed method can in principle be applied with equal efficacy to the so-called drained cathode cell designs and to cells having any anode composition, because only knowledge of the electrolyte conduction behavior is required a priori. For an operating cell, the proposed method requires only readily available electrical measurements and the facilities to process the acquired signals. The proposed method rests on the ability to identify certain characteristics of the transients in the reduction cell terminal voltages caused by the quasiperiodic introduction of alumina. It will be shown that these voltage transients manifest measurable properties, in a statistical sense, that should permit estimation of the ionized alumina concentration with a delay of one alumina feed cycle. The next logical step following the present work, consistent with the Aluminum Technology Roadmap [1], is to experimentally verify the predictions made here; no doubt practical refinements to the proposed approach will evolve during the course of experimentation. Successful verification of the proposed estimation method will permit the design of reduction cell control algorithms based directly on the mass balance of alumina in the electrolyte. This report assumes that the reader understands certain basic concepts important to the operation of electrolytic cells, and the Hall-Heroult cell

  8. ESTIMATING IMPURITIES IN SURPLUS PLUTONIUM FOR DISPOSITION

    SciTech Connect (OSTI)

    Allender, J.; Moore, E.

    2013-07-17

    The United States holds at least 61.5 metric tons (MT) of plutonium that is permanently excess to use in nuclear weapons programs, including 47.2 MT of weapons-grade plutonium. Surplus inventories will be stored safely by the Department of Energy (DOE) and then transferred to facilities that will prepare the plutonium for permanent disposition. The Savannah River National Laboratory (SRNL) operates a Feed Characterization program for the Office of Fissile Materials Disposition of the National Nuclear Security Administration and the DOE Office of Environmental Management. Many of the items that require disposition are only partially characterized, and SRNL uses a variety of techniques to predict the isotopic and chemical properties that are important for processing through the Mixed Oxide Fuel Fabrication Facility and alternative disposition paths. Recent advances in laboratory tools, including Prompt Gamma Analysis and Peroxide Fusion treatment, provide data on the existing inventories that will enable disposition without additional, costly sampling and destructive analysis.

  9. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM Transmittal Letter and Attachment Final.pdf (541.36 KB) More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  10. Ambient Corporation's response to NBP RFI: Communications Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ambient Corporation's response to NBP RFI: Communications Requirements Ambient Corporation's response to NBP RFI: Communications Requirements Ambient Corporation's comments on ...

  11. Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate

    SciTech Connect (OSTI)

    Warren, R.N.

    1998-09-29

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

  12. Re: NBP RFI: Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Re: NBP RFI: Communications Requirements National Cable & Telecommunications Association comments on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements (581.53 KB) More Documents & Publications Re: NBP RFI: Communications Requirements- Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to

  13. DOE Challenge Home, California Program Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Home, California Program Requirements DOE Challenge Home, California Program Requirements DOE Challenge Home, California Program Requirements, as posted on the U.S. Department of Energy's DOE Challenge Home website. ch_california_requirements2013.pdf (296.75 KB) More Documents & Publications Washington DOE ZERH Program Requirements DOE Zero Energy Ready Home National Program Requirements (Rev. 04) California DOE ZERH Program Requiremets

  14. Numerical estimation of adsorption energy distributions from adsorption isotherm data with the expectation-maximization method

    SciTech Connect (OSTI)

    Stanley, B.J.; Guiochon, G. |

    1993-08-01

    The expectation-maximization (EM) method of parameter estimation is used to calculate adsorption energy distributions of molecular probes from their adsorption isotherms. EM does not require prior knowledge of the distribution function or the isotherm, requires no smoothing of the isotherm data, and converges with high stability towards the maximum-likelihood estimate. The method is therefore robust and accurate at high iteration numbers. The EM algorithm is tested with simulated energy distributions corresponding to unimodal Gaussian, bimodal Gaussian, Poisson distributions, and the distributions resulting from Misra isotherms. Theoretical isotherms are generated from these distributions using the Langmuir model, and then chromatographic band profiles are computed using the ideal model of chromatography. Noise is then introduced in the theoretical band profiles comparable to those observed experimentally. The isotherm is then calculated using the elution-by-characteristic points method. The energy distribution given by the EM method is compared to the original one. Results are contrasted to those obtained with the House and Jaycock algorithm HILDA, and shown to be superior in terms of robustness, accuracy, and information theory. The effect of undersampling of the high-pressure/low-energy region of the adsorption is reported and discussed for the EM algorithm, as well as the effect of signal-to-noise ratio on the degree of heterogeneity that may be estimated experimentally.

  15. IDC RP2 & 3 US Industry Standard Cost Estimate Summary.

    SciTech Connect (OSTI)

    Harris, James M.; Huelskamp, Robert M.

    2015-01-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  16. API Requirements for Dynamic Graph Prediction

    SciTech Connect (OSTI)

    Gallagher, B; Eliassi-Rad, T

    2006-10-13

    Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

  17. RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE

    SciTech Connect (OSTI)

    Watkins, R.; Leduc, D.

    2011-03-24

    Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

  18. Requirements definition for Hanford Access Control System

    SciTech Connect (OSTI)

    Curry, R.H.; Anema, R.J.; Byers, W.R.; Champion, R.E.; Forsberg, J.I.; Fritz, R.L.; Glasscock, J.A.; Keck, R.D.; McRae, L.P.; Morales, T.P.; Sams, M.A.; Schwartz, M.J.; Vickery, E.A.

    1990-03-01

    This document defines the philosophy for access control strategy at the Department of Energy (DOE) Hanford Site. It describes the required elements necessary for effective access control system applications. The document specifies performance requirements for various levels and types of access control equipment. It also discusses methods for measuring the performance of access control equipment and processes. Selected guidance related to testing and maintenance of various levels and types of access control equipment also is included. This document addresses an essential element of the overall security program at Hanford. It supports the DOE philosophy for security programs as defined in the DOE Orders. As stated in DOE Order 5632.1A (Protection Program Operations), ``physical protection of security interests encompasses three major activities: physical security systems, protective forces, and system performance tests.``

  19. Report of the Federal Internetworking Requirements Panel

    SciTech Connect (OSTI)

    1994-05-31

    The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

  20. Improvements to Technical Specifications surveillance requirements

    SciTech Connect (OSTI)

    Lobel, R.; Tjader, T.R.

    1992-12-01

    In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 ( Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power.

  1. NERSC-BES-Requirements-Yelick10.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Basic Energy Science Research Katherine Yelick NERSC Director Requirements Workshop NERSC Mission Accelerate the pace of scientific discovery for all DOE Office of Science (SC) research through computing and data systems and services. Efficient algorithms + flexible software + effective machines great computational science. 2 2010 Allocations NERSC is the Production Facility for DOE Office of Science * NERSC serves a large population Approximately 3000 users, 400 projects, 500 code instances *

  2. Acronyms - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acronyms by Website Administrator CRD - Contractor Requirements Document DNFSB - Defense Nuclear Facilities Safety Board DMTeam - Directives Management Team (MA-90) DOE P - Department of Energy Policy DOE N - Department of Energy Notice DOE O - Department of Energy Order DOE M - Department of Energy Manual DOE G - Department of Energy Guide DPC - Directives Point of Contact DRB - Directives Review Board established by DOE O 251.1C OPI - Office of Primary Interest (the writing organization)

  3. 02-HellandNERSC-Requirements.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2014 Barbara Helland Advanced Scientific Computing Research NERSC-ASCR Requirements Review 1 ASCR 2 NERSC---ASCR R equirements R eview 1 /15/2014 3 World C lass F aciliBes * High Performance Production Computing for the Office of Science * Characterized by a large number of projects (over 400) and users ( over 4800) * Leadership Computing for Open Science * Characterized by a small number of projects ( about 50) and users (about 800) with computationally intensive projects * Linking it

  4. DPC Resources - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible and usable, working in accordance with the Web Content Accessibility Guidelines (WCAG v1.0). If there is anything on this site - accessibility or validation related - that is not according to the standard, please contact the Site Administration, and not the Plone Team. Access keys Access keys are a navigation device

  5. Cyber Security Requirements for Risk Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-19

    The Notice ensures that system owners consistently assess the threats to and vulnerabilities of systems in order to implement adequate security controls. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, and protect DOE information and information systems from unauthorized access, use, disclosure, modification, or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  6. Directives Tools - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible and usable, working in accordance with the Web Content Accessibility Guidelines (WCAG v1.0). If there is anything on this site - accessibility or validation related - that is not according to the standard, please contact the Site Administration, and not the Plone Team. Access keys Access keys are a navigation device

  7. Browse Designations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible and usable, working in accordance with the Web Content Accessibility Guidelines (WCAG v1.0). If there is anything on this site - accessibility or validation related - that is not according to the standard, please contact the Site Administration, and not the Plone Team. Access keys Access keys are a navigation device

  8. Rescinded Delegations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible and usable, working in accordance with the Web Content Accessibility Guidelines (WCAG v1.0). If there is anything on this site - accessibility or validation related - that is not according to the standard, please contact the Site Administration, and not the Plone Team. Access keys Access keys are a navigation device

  9. TWRS safety SSCs: Requirements and characteristics

    SciTech Connect (OSTI)

    Smith-Fewell, M.A.

    1997-12-30

    Safety Systems, Structures, and Components (SSCs) have been identified from hazard and accident analyses. These analyses were performed to support the Tank Waste Remediation System (TWRS) Final Safety Analysis Report (FSAR) and Basis for Interim Operation (BID). The text identifies and evaluates the SSCs and their supporting SSCs to show that they either prevent the occurrence of the accident or mitigate the consequences of the accident to below the acceptance guidelines. The requirements for the SSCs to fulfill these tasks are described.

  10. Biological and Environmental Research Network Requirements Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Network Requirements Review Final Report September 18-19, 2015 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this doc- ument is believed to contain correct informa on, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness

  11. Estimation and decomposition of productive efficiency in a panel data model: an application to electric utilities

    SciTech Connect (OSTI)

    Melfi, C.A.

    1984-01-01

    New econometric methodology for modeling and estimating technical and allocative efficiency in production is proposed and applied. Translog cost frontier and share equations are presented in a panel data context, with the structure of the error terms representing noise and inefficiency. The use of panel data with this multivariate error components approach facilitates the separation of eficiency into its technical and allocative components, as well as the separation of noise from inefficiency. The model used is logically consistent in that the distributional assumptions concerning the disturbance vectors take into account the relationships among the disturbance terms in the cost and share equations. This method of efficiency measurement is applied to the electric utilities industry to obtain individual firm estimates of technical and allocative efficiency. The data consist of yearly cost, output, and input price information on 38 electric utility firms over a period of 18 years. Rate-of-return regulation in the electric utilities industry requires estimation of a regulated cost frontier and the associated share equations. Estimates of technical and allocative efficiency are obtained for each firm in every year. Comparisons are made with previous efficiency measurement studies. The measures of efficiency are analyzed in light of rate-of-return regulation.

  12. Cost estimates for near-term depolyment of advanced traffic management systems. Final report

    SciTech Connect (OSTI)

    Stevens, S.S.; Chin, S.M.

    1993-02-15

    The objective of this study is to provide cost est engineering, design, installation, operation and maintenance of Advanced Traffic Management Systems (ATMS) in the largest 75 metropolitan areas in the United States. This report gives estimates for deployment costs for ATMS in the next five years, subject to the qualifications and caveats set out in following paragraphs. The report considers infrastructure components required to realize fully a functional ATMS over each of two highway networks (as discussed in the Section describing our general assumptions) under each of the four architectures identified in the MITRE Intelligent Vehicle Highway Systems (IVHS) Architecture studies. The architectures are summarized in this report in Table 2. Estimates are given for eight combinations of highway networks and architectures. We estimate that it will cost between $8.5 Billion (minimal network) and $26 Billion (augmented network) to proceed immediately with deployment of ATMS in the largest 75 metropolitan areas. Costs are given in 1992 dollars, and are not adjusted for future inflation. Our estimates are based partially on completed project costs, which have been adjusted to 1992 dollars. We assume that a particular architecture will be chosen; projected costs are broken by architecture.

  13. A review of existing models and methods to estimate employment effects of pollution control policies

    SciTech Connect (OSTI)

    Darwin, R.F.; Nesse, R.J.

    1988-02-01

    The purpose of this paper is to provide information about existing models and methods used to estimate coal mining employment impacts of pollution control policies. The EPA is currently assessing the consequences of various alternative policies to reduce air pollution. One important potential consequence of these policies is that coal mining employment may decline or shift from low-sulfur to high-sulfur coal producing regions. The EPA requires models that can estimate the magnitude and cost of these employment changes at the local level. This paper contains descriptions and evaluations of three models and methods currently used to estimate the size and cost of coal mining employment changes. The first model reviewed is the Coal and Electric Utilities Model (CEUM), a well established, general purpose model that has been used by the EPA and other groups to simulate air pollution control policies. The second model reviewed is the Advanced Utility Simulation Model (AUSM), which was developed for the EPA specifically to analyze the impacts of air pollution control policies. Finally, the methodology used by Arthur D. Little, Inc. to estimate the costs of alternative air pollution control policies for the Consolidated Coal Company is discussed. These descriptions and evaluations are based on information obtained from published reports and from draft documentation of the models provided by the EPA. 12 refs., 1 fig.

  14. Biological and Environmental Research Network Requirements

    SciTech Connect (OSTI)

    Balaji, V.; Boden, Tom; Cowley, Dave; Dart, Eli; Dattoria, Vince; Desai, Narayan; Egan, Rob; Foster, Ian; Goldstone, Robin; Gregurick, Susan; Houghton, John; Izaurralde, Cesar; Johnston, Bill; Joseph, Renu; Kleese-van Dam, Kerstin; Lipton, Mary; Monga, Inder; Pritchard, Matt; Rotman, Lauren; Strand, Gary; Stuart, Cory; Tatusova, Tatiana; Tierney, Brian; Thomas, Brian; Williams, Dean N.; Zurawski, Jason

    2013-09-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet be a highly successful enabler of scientific discovery for over 25 years. In November 2012, ESnet and the Office of Biological and Environmental Research (BER) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the BER program office. Several key findings resulted from the review. Among them: 1) The scale of data sets available to science collaborations continues to increase exponentially. This has broad impact, both on the network and on the computational and storage systems connected to the network. 2) Many science collaborations require assistance to cope with the systems and network engineering challenges inherent in managing the rapid growth in data scale. 3) Several science domains operate distributed facilities that rely on high-performance networking for success. Key examples illustrated in this report include the Earth System Grid Federation (ESGF) and the Systems Biology Knowledgebase (KBase). This report expands on these points, and addresses others as well. The report contains a findings section as well as the text of the case studies discussed at the review.

  15. Implementation of subsidence control regulatory requirements

    SciTech Connect (OSTI)

    Barkley, D.

    1999-07-01

    Underground coal mining in Illinois has shown an increasing percentage of total coal mined relative to surface mining. In the past 20 years, the percentage of underground to surface mine production has steadily increased. Underground mining is expected to continue to dominate Illinois coal production into the 21st century. The drive for higher production and lower operating costs should increase the number of longwall and high extraction retreat mines. This will be achieved through conversion of existing room and pillar mines or initiation of new underground mining operations. The environmental regulations that govern the mitigation of surface impacts have evolved at both the state and federal level. Federal regulations passed in 1995 modifying the Surface Mining Control and Reclamation Act mandated additional restrictions and regulatory requirements beyond those adopted in 1977. State regulatory bodies that implement the regulations are now working to bring their regulations and procedures into compliance with the oversight federal counterpart. many states have raised concerns over the practical application of certain aspects of the new permitting requirements. This paper describes past and present subsidence regulations in Illinois, their impact on the coal industry and on the landowners above underground coal mining. Potential problems in implementation of the new regulatory requirements as well as additional burdens placed on coal companies to comply with the regulations are explored.

  16. Advanced Neutron Sources: Plant Design Requirements

    SciTech Connect (OSTI)

    Not Available

    1990-07-01

    The Advanced Neutron Source (ANS) is a new, world class facility for research using hot, thermal, cold, and ultra-cold neutrons. At the heart of the facility is a 350-MW{sub th}, heavy water cooled and moderated reactor. The reactor is housed in a central reactor building, with supporting equipment located in an adjoining reactor support building. An array of cold neutron guides fans out into a large guide hall, housing about 30 neutron research stations. Office, laboratory, and shop facilities are included to provide a complete users facility. The ANS is scheduled to begin operation at the Oak Ridge National Laboratory at the end of the decade. This Plant Design Requirements document defines the plant-level requirements for the design, construction, and operation of the ANS. This document also defines and provides input to the individual System Design Description (SDD) documents. Together, this Plant Design Requirements document and the set of SDD documents will define and control the baseline configuration of the ANS.

  17. Parameter estimation with Sandage-Loeb test

    SciTech Connect (OSTI)

    Geng, Jia-Jia; Zhang, Jing-Fei; Zhang, Xin E-mail: jfzhang@mail.neu.edu.cn

    2014-12-01

    The Sandage-Loeb (SL) test directly measures the expansion rate of the universe in the redshift range of 2 ∼< z ∼< 5 by detecting redshift drift in the spectra of Lyman-α forest of distant quasars. We discuss the impact of the future SL test data on parameter estimation for the ΛCDM, the wCDM, and the w{sub 0}w{sub a}CDM models. To avoid the potential inconsistency with other observational data, we take the best-fitting dark energy model constrained by the current observations as the fiducial model to produce 30 mock SL test data. The SL test data provide an important supplement to the other dark energy probes, since they are extremely helpful in breaking the existing parameter degeneracies. We show that the strong degeneracy between Ω{sub m} and H{sub 0} in all the three dark energy models is well broken by the SL test. Compared to the current combined data of type Ia supernovae, baryon acoustic oscillation, cosmic microwave background, and Hubble constant, the 30-yr observation of SL test could improve the constraints on Ω{sub m} and H{sub 0} by more than 60% for all the three models. But the SL test can only moderately improve the constraint on the equation of state of dark energy. We show that a 30-yr observation of SL test could help improve the constraint on constant w by about 25%, and improve the constraints on w{sub 0} and w{sub a} by about 20% and 15%, respectively. We also quantify the constraining power of the SL test in the future high-precision joint geometric constraints on dark energy. The mock future supernova and baryon acoustic oscillation data are simulated based on the space-based project JDEM. We find that the 30-yr observation of SL test would help improve the measurement precision of Ω{sub m}, H{sub 0}, and w{sub a} by more than 70%, 20%, and 60%, respectively, for the w{sub 0}w{sub a}CDM model.

  18. AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)

    SciTech Connect (OSTI)

    FERRIES SR; KLINK KL; OSTAPKOWICZ B

    2012-01-30

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  19. CLEAR (Calculates Logical Evacuation And Response): A Generic Transportation Network Model for the Calculation of Evacuation Time Estimates

    SciTech Connect (OSTI)

    Moeller, M. P.; Urbanik, II, T.; Desrosiers, A. E.

    1982-03-01

    This paper describes the methodology and application of the computer model CLEAR (Calculates Logical Evacuation And Response) which estimates the time required for a specific population density and distribution to evacuate an area using a specific transportation network. The CLEAR model simulates vehicle departure and movement on a transportation network according to the conditions and consequences of traffic flow. These include handling vehicles at intersecting road segments, calculating the velocity of travel on a road segment as a function of its vehicle density, and accounting for the delay of vehicles in traffic queues. The program also models the distribution of times required by individuals to prepare for an evacuation. In order to test its accuracy, the CLEAR model was used to estimate evacuatlon tlmes for the emergency planning zone surrounding the Beaver Valley Nuclear Power Plant. The Beaver Valley site was selected because evacuation time estimates had previously been prepared by the licensee, Duquesne Light, as well as by the Federal Emergency Management Agency and the Pennsylvania Emergency Management Agency. A lack of documentation prevented a detailed comparison of the estimates based on the CLEAR model and those obtained by Duquesne Light. However, the CLEAR model results compared favorably with the estimates prepared by the other two agencies.

  20. Method and global relationship for estimation of transmitted solar energy distribution in passive solar rooms

    SciTech Connect (OSTI)

    Athienitis, A.K.; Stylianou, M. )

    1991-01-01

    Estimation of the distribution of transmitted solar radiation within a room with large windows is required for correct prediction of building thermal performance and for optimal positioning of the thermal storage mass. This article presents a detailed computer method that determines the instantaneous solar radiation transmitted through a window and absorbed by each room interior surface, and a correlation for estimating the fraction of daily total transmitted solar radiation absorbed by the floor for several latitudes, for different shapes of enclosures, and for varying surface solar absorptances. The correlation was developed by fitting an exponential relationship to results obtained from a numerical study of the variation of the following parameters influencing the distribution of solar radiation: latitude, day of year, geometry of enclosure (width-to-depth ratio and window azimuth angle), window-to-floor area ratio, and surface absorptances.