Powered by Deep Web Technologies
Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental...

2

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regulators, Requirements, Statutes Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental Protection Agency (EPA) EPA Homepage EPA - Region VI U.S. Department of Energy (DOE) DOE Homepage DOE Environmental Policy DOE Citizen's Advisory Board U.S. Fish and Wildlife Service (FWS) Southwest Region 2 New Mexico Environment Department (NMED) NMED Homepage NMED DOE Oversight Office

3

Implementation Regulations 3TU MSc Sustainable Energy Technology Delft, 2014-2015 THE IMPLEMENTATION REGULATIONS  

E-Print Network [OSTI]

Implementation Regulations 3TU MSc Sustainable Energy Technology ­ Delft, 2014-2015 THE IMPLEMENTATION REGULATIONS 2014 - 2015 3TU MASTER'S DEGREE PROGRAMME Sustainable Energy Technology - Delft (SET) DELFT UNIVERSITY OF TECHNOLOGY #12;Implementation Regulations MSc Sustainable Energy Technology SET

4

SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 |  

Broader source: Energy.gov (indexed) [DOE]

SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 The Energy Policy Act of 2005 added section 216(h) to the Federal Power Act providing for the Department of Energy to act as the lead agency for coordinating all applicable Federal authorizations and related environmental reviews required under Federal law in order to site an electric transmission facility. The Act authorized DOE to issue any regulations necessary to implement the provisions of 216(h). SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 More Documents & Publications SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 Comments on Notice of Proposed Rulemaking for Coordination of Federal

5

Vessel Monitoring System (VMS) Power Down Exemption Request Regulations implementing the requirements for the vessel monitoring system (VMS) within the NMFS Northeast  

E-Print Network [OSTI]

Vessel Monitoring System (VMS) Power Down Exemption Request Regulations implementing consecutive hours. (2) A vessel with a valid multispecies limited access, scallop limited access or surfclam/ocean period of 30 consecutive days. Vessel owners or operators may sign out of the VMS program by first

6

Council on Environmental Quality - Regulations for Implementing...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- StatuteStatute: Council on Environmental Quality - Regulations for Implementing the Procedural Provisions of the NEPALegal Abstract...

7

Implementation Regulations MSc Chemical Engineering 2013-2014 THE IMPLEMENTATION REGULATIONS  

E-Print Network [OSTI]

.......................................................................................................4 Article 7 ­ The Nuclear Science & Engineering track. The programme comprises the following tracks: - Chemical Product Engineering, - Process Engineering, - NuclearImplementation Regulations MSc Chemical Engineering 2013-2014 THE IMPLEMENTATION REGULATIONS 2013

8

IMPLEMENTATION OF DEPARTMENT OF ENERGY ACQUISITION REGULATION (DEAR)  

Broader source: Energy.gov (indexed) [DOE]

IMPLEMENTATION OF IMPLEMENTATION OF DEPARTMENT OF ENERGY ACQUISITION REGULATION (DEAR) DEAR 952.204-2 SECURITY (AUG 2009) CLAUSE REQUIREMENTS FACT SHEET I Access Authorization (Security Clearance) Request Information Applicants: Access Authorization requests will not be accepted or processed without a background review and drug test results. Reciprocity: A background review is not required for cases in which a clearance may be granted through reciprocity. Reinstates: Employees eligible for reinstatement without a background investigation do not require a background review; however, the background review will be required for employees who have not been investigated in the past 10 years. Background Review Requirements 1. The results of a test that demonstrates the absence of any illegal drugs (existing

9

Cooperating Agencies in Implementing the Procedural Requirements of NEPA  

Broader source: Energy.gov (indexed) [DOE]

30, 2002 30, 2002 MEMORANDUM FOR THE HEADS OF FEDERAL AGENCIES FROM: JAMES CONNAUGHTON Chair SUBJECT: COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT The purpose of this Memorandum is to ensure that all Federal agencies are actively considering designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that Federal agencies actively participate as cooperating agencies in other agency's NEPA processes. 1 The CEQ regulations addressing cooperating agencies status (40 C.F.R. §§ 1501.6 & 1508.5) implement the NEPA mandate that Federal agencies responsible for preparing NEPA

10

Reporting Cooperating Agencies in Implementing the Procedural Requirements  

Broader source: Energy.gov (indexed) [DOE]

Reporting Cooperating Agencies in Implementing the Procedural Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). REPORTING COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT More Documents & Publications Cooperating Agencies in Implementing the Procedural Requirements of the

11

Reporting Cooperating Agencies in Implementing the Procedural Requirements  

Broader source: Energy.gov (indexed) [DOE]

Reporting Cooperating Agencies in Implementing the Procedural Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). REPORTING COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT More Documents & Publications Cooperating Agencies in Implementing the Procedural Requirements of the

12

Oracle accrual plans from requirements to implementation  

SciTech Connect (OSTI)

Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

Rivera, Christine K [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

13

CEQ Regulations for Implementing the Procedural Provisions of NEPA  

Broader source: Energy.gov (indexed) [DOE]

Executive Office of the President Executive Office of the President REGULATIONS For Implementing The Procedural Provisions Of The NATIONAL ENVIRONMENTAL POLICY ACT Reprint 40 CFR Parts 1500-1508 (2005) This page is blank (inside front cover) TABLE OF CONTENTS PART 1500-PURPOSE, POLICY AND MANDATE Sec. 1500.1 Purpose. 1500.2 Policy. 1500.3 Mandate. 1500.4 Reducing paperwork. 1500.5 Reducing delay. 1500.6 Agency authority. PART 1501-NEPA AND AGENCY PLANNING Sec. 1501.1 Purpose. 1501.2 Apply NEPA early in the process. 1501.3 When to prepare an environmental assessment. 1501.4 Whether to prepare an environmental impact statement. 1501.5 Lead agencies. 1501.6 Cooperating agencies. 1501.7 Scoping. 1501.8 Time limits. PART 1502-ENVIRONMENTAL IMPACT STATEMENT Sec. 1502.1 Purpose. 1502.2 Implementation. 1502.3 Statutory requirements for statements.

14

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide was developed in support of Title 10 Code of Federal Regulations (CFR) Part 830, Nuclear Safety Management. It provides guidance for the requirements defined in 10 CFR 830.205, Technical Safety Requirements.

2014-09-08T23:59:59.000Z

15

Regulations of the Arkansas Plan of Implementation for Air Pollution  

Broader source: Energy.gov (indexed) [DOE]

of the Arkansas Plan of Implementation for Air of the Arkansas Plan of Implementation for Air Pollution Control (Arkansas) Regulations of the Arkansas Plan of Implementation for Air Pollution Control (Arkansas) < Back Eligibility Commercial Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Transportation Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality The Regulations of the Arkansas Plan of Implementation for Air Pollution Control are applicable to any stationary source that has the potential to emit any federally regulated air pollutant. The purpose and intent of Regulation 19, as amended, is to provide a clear delineation of those

16

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides information to assist in implementation of Title 10 Code of Federal Regulations Part 830.203, "Unreviewed Safety Question Process," of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy, including the National Nuclear Security Administration. Cancels DOE G 424.1-1.

2006-07-24T23:59:59.000Z

17

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides information to assist in the implementation and interpretation of Title 10 Code of Federal Regulations (CFR) Part 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for applicable nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Canceled by DOE N 251.93.

2001-10-24T23:59:59.000Z

18

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Cancels DOE G 424.1-1A. Admin Chg 1 dated 4-12-13.

2010-04-08T23:59:59.000Z

19

Comments Received on Proposed Rulemaking for regulation implementing  

Broader source: Energy.gov (indexed) [DOE]

Received on Proposed Rulemaking for regulation Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal Lands Comments Received on Proposed Rulemaking for regulation implementing section 216(h): Coordination of Federal Transmission Permitting on Federal Lands Section 1221(a) of EPAct 2005, which added section 216(h) to the Federal Power Act, stated that the U.S. Department of Energy (DOE) is to coordinate all Federal authorizations and related environmental reviews needed for siting interstate electric transmission projects, including National Environmental Policy Act of 1969 (NEPA) reviews. The purpose of this coordination is to streamline agencies' review processes and avoid duplication among Federal agencies. Section 216(h) of the Federal Power Act

20

Reporting Cooperating Agencies in Implementing the Procedural Requirements of NEPA  

Broader source: Energy.gov (indexed) [DOE]

3, 2004 3, 2004 MEMORANDUM FOR THE HEADS OF FEDERAL AGENCIES FROM: JAMES L. CONNAUGHTON SUBJECT: REPORTING COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT The January 30, 2002, Memorandum for Heads of Federal Agencies, Subject: Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act 1 , consistent with the President's commitment to increase local participation and facilitate cooperative conservation, established a reporting requirement for all EISs and EAs. The purpose of this Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

22

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

23

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Cancels DOE G 424.1-1A. Admin Chg 1 dated 4-12-13. Admin Chg 2, dated 6-12-13, cancels DOE G 424.1-1B Admin Chg 1.

2010-04-08T23:59:59.000Z

24

Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program  

Broader source: Energy.gov [DOE]

Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program (Waste Management Conference 2007)

25

Federal Requirements for Sustainable Buildings by Law and Regulation |  

Broader source: Energy.gov (indexed) [DOE]

Law and Law and Regulation Federal Requirements for Sustainable Buildings by Law and Regulation October 4, 2013 - 4:44pm Addthis For sustainable buildings, Federal agencies are required to comply with the following laws and regulations. Also see Federal Requirements for Sustainable Buildings by Topic and Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings. Executive Order (E.O.) 13514 Signed on October 5, 2009, E.O. 13514-Federal Leadership in Environmental, Energy and Economic Performance-expands on Federal energy reduction and environmental performance requirements set in E.O. 13423, as well as outlines specific management strategies to improve sustainability, including managing existing buildings to reduce energy, water and materials

26

Re: NBP RFI: Communications Requirements- Implementing the National...  

Broader source: Energy.gov (indexed) [DOE]

the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements-...

27

DESIGN AND IMPLEMENTATION OF A FUZZY LOGIC-BASED VOLTAGE CONTROLLER FOR VOLTAGE REGULATION  

E-Print Network [OSTI]

1 DESIGN AND IMPLEMENTATION OF A FUZZY LOGIC-BASED VOLTAGE CONTROLLER FOR VOLTAGE REGULATION In this paper the design and implementation of a fuzzy logic-based controller is described for regulating the output voltage of a synchronous generator. An automated fuzzy logic-based control strategy is presented

LaMeres, Brock J.

28

Requirements and Issues with Implementing SEA as a Sustainable Development Instrument in Ukraine  

Science Journals Connector (OSTI)

This chapter aims to discuss the requirements and issues associated with the implementation of Strategic Environmental Assessment (SEA) as an instrument for sustainable development in Ukraine

Dmytro Palekhov; Michael Schmidt

2011-01-01T23:59:59.000Z

29

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Does not cancel other directives.

2010-11-03T23:59:59.000Z

30

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Cancels DOE G 423.1-1.

2010-11-03T23:59:59.000Z

31

Frequency Regulation from Flexible Loads: Potential, Economics, and Implementation  

E-Print Network [OSTI]

potential for providing regulation reserve to the grid. This paper aims to provide a foundation in communications, and dynamics modeling errors. I. INTRODUCTION In the electrical power grid, balance between) allow non-generator resources with limited energy capacities, such as batteries and flywheels

Sanandaji, Borhan M.

32

DSP IMPLEMENTATION OF DC VOLTAGE REGULATION USING ADAPTIVE CONTROL FOR 200 KW 62000 RPM  

E-Print Network [OSTI]

to control the DC voltage for 200 kW induction generator rated at a speed of 62000 RPM under different load to regulate the DC voltage for high speed induction generators rated from 5 kW to 200 kW. ii #12DSP IMPLEMENTATION OF DC VOLTAGE REGULATION USING ADAPTIVE CONTROL FOR 200 KW 62000 RPM INDUCTION

Wu, Thomas

33

PROCEDURES FOR ESTABLISHING OR CHANGING IMPLEMENTATION PLANS FOR THE CULTURAL DIVERSITY REQUIREMENT  

E-Print Network [OSTI]

PROCEDURES FOR ESTABLISHING OR CHANGING IMPLEMENTATION PLANS FOR THE CULTURAL DIVERSITY REQUIREMENT with a post baccalaureate program is encouraged, using its own procedures, to evaluate the adequacy of those

Arnold, Jonathan

34

Discovery of a Splicing Regulator Required for Cell Cycle Progression  

SciTech Connect (OSTI)

In the G1 phase of the cell division cycle, eukaryotic cells prepare many of the resources necessary for a new round of growth including renewal of the transcriptional and protein synthetic capacities and building the machinery for chromosome replication. The function of G1 has an early evolutionary origin and is preserved in single and multicellular organisms, although the regulatory mechanisms conducting G1 specific functions are only understood in a few model eukaryotes. Here we describe a new G1 mutant from an ancient family of apicomplexan protozoans. Toxoplasma gondii temperature-sensitive mutant 12-109C6 conditionally arrests in the G1 phase due to a single point mutation in a novel protein containing a single RNA-recognition-motif (TgRRM1). The resulting tyrosine to asparagine amino acid change in TgRRM1 causes severe temperature instability that generates an effective null phenotype for this protein when the mutant is shifted to the restrictive temperature. Orthologs of TgRRM1 are widely conserved in diverse eukaryote lineages, and the human counterpart (RBM42) can functionally replace the missing Toxoplasma factor. Transcriptome studies demonstrate that gene expression is downregulated in the mutant at the restrictive temperature due to a severe defect in splicing that affects both cell cycle and constitutively expressed mRNAs. The interaction of TgRRM1 with factors of the tri-SNP complex (U4/U6 & U5 snRNPs) indicate this factor may be required to assemble an active spliceosome. Thus, the TgRRM1 family of proteins is an unrecognized and evolutionarily conserved class of splicing regulators. This study demonstrates investigations into diverse unicellular eukaryotes, like the Apicomplexa, have the potential to yield new insights into important mechanisms conserved across modern eukaryotic kingdoms.

Suvorova, Elena S.; Croken, Matthew; Kratzer, Stella; Ting, Li-Min; Conde de Felipe, Magnolia; Balu, Bharath; Markillie, Lye Meng; Weiss, Louis M.; Kim, Kami; White, Michael W.

2013-02-01T23:59:59.000Z

35

A systematic approach for implementation of new MC and A requirements  

SciTech Connect (OSTI)

In early 1988 the Material Control and Accountability Section at the Savannah River Site (SRS) was given the task of implementing DOE MC and A Order, 5633.3. The requirements of this Order are significantly different than those of the previous DOE MC and A Order. This, coupled with the size and complexity of operations at SRS made implementation of this Order a formidable task. The Material Control and Accountability Section at SRS took a somewhat unique approach. First, the order was broken down into 240 individual requirements. Each requirement was given a number, summarized in a short phrase, and entered into a computer database. This database was then used to prepare a check sheet for evaluating each Material Balance Area (MBA). 9 figs.

Wilson, W.A.

1989-01-01T23:59:59.000Z

36

Implementing NCNP's 21st century geometry capability: requirements, issues, and problems  

SciTech Connect (OSTI)

A new geometry capability has been implemented in MCNP that permits the existence of an unstructured mesh with its legacy Constructive Solid Geometry (CSG) capability to form a hybrid geometry. This new feature enables the user to build complex 3-D models with Computer Aided Engineering (CAE) tools, such as Abaqus, and perform a neutronics analysis on the same geometry mesh that is used for thermo-mechanical analyses. This paper will present an overview of the issues and problems encountered in implementing the requirements for the hybrid geometry capability in MCNP.

Martz, Roger L [Los Alamos National Laboratory; Goorley, John T [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

37

24 Academic Regulations/Degree Requirements CATALOG POLICIES  

E-Print Network [OSTI]

in achieving the goals of the institution. Necessary interpretations of these policies will be made. The advisor will counsel, but the final responsibility remains that of the student. A student is required students for information about General Education requirements. The advisor assists the student to develop

Xie,Jiang (Linda)

38

Academic Regulations/Degree Requirements 25 CATALOG POLICIES  

E-Print Network [OSTI]

in achieving the goals of the institution. Necessary interpretations of these policies will be made not yet chosen a major field and may be consulted by other students for information about General. The advisor will counsel, but the final responsibility remains that of the student. A student is required

Xie,Jiang (Linda)

39

Polarization requirements for ensemble implementations of quantum algorithms with a single-bit output  

SciTech Connect (OSTI)

We compare the failure probabilities of ensemble implementations of quantum algorithms which use pseudopure initial states, quantified by their polarization, to those of competing classical probabilistic algorithms. Specifically we consider a class algorithms which require only one bit to output the solution to problems. For large ensemble sizes, we present a general scheme to determine a critical polarization beneath which the quantum algorithm fails with greater probability than its classical competitor. We apply this to the Deutsch-Jozsa algorithm and show that the critical polarization is 86.6%.

Anderson, Brandon M.; Collins, David [Department of Physics, University of Texas at Dallas, P.O. Box 830688, Richardson, Texas 75083 (United States); Department of Physics, Bucknell University, Lewisburg, Pennsylvania 17837 (United States)

2005-10-15T23:59:59.000Z

40

Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab  

Broader source: Energy.gov [DOE]

Implementation of DOE NPH Requirements at the Thomas Jefferson National Accelerator Facility (TJNAF), a Non-Nuclear DOE Lab David Luke, DOE, Thomas Jefferson Site Office Stephen McDuffie, DOE, Office of the Chief of Nuclear Safety

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Implementation plan for Title 40 Code of Federal Regulations Parts 280 and 281; Final rules for underground storage tanks  

SciTech Connect (OSTI)

This report presents the schedules and methods required to comply with the newly promulgated Underground Storage Tank (UST) Regulations Title 40 Code of Federal Regulations (CFR) 280 and 281. These rules were promulgated by the US Environmental Protection Agency (EPA) on September 23, 1988, and became effective December 22, 1988. These regulations are required by Subtitle I of the Resource Conservation and Recovery Act of 1976. Their purpose is to protect the groundwater supplies of the United States in the following ways: Closing old tanks; detecting and remediating tank leaks and spills; establishing stringent standards for new tanks; and upgrade of existing tanks to new-tank standards. 3 refs., 5 tabs.

Stupka, R.C.

1989-04-01T23:59:59.000Z

42

Active regulator of SIRT1 is required for cancer cell survival but not for SIRT1 activity  

Science Journals Connector (OSTI)

...author and source are credited. Active regulator of SIRT1 is required for cancer cell...laboratory and clinical studies. Active regulator of SIRT1 (AROS) was the first reported post-transcriptional regulator of SIRT1 activity, enhancing SIRT1-mediated...

2013-01-01T23:59:59.000Z

43

Implementation Implementation  

E-Print Network [OSTI]

The SLP System: An Implementation of Super Logic Programs 1 The SLP System: An Implementation.09.2002 The SLP System: An Implementation of Super Logic Programs 4 SLP Interpreter (1) Negation Semantics Brass Dagstuhl, 16.09.2002 #12; The SLP System: An Implementation of Super Logic Programs 5 SLP

Brass, Stefan

44

Implementation Implementation  

E-Print Network [OSTI]

The SLP System: An Implementation of Super Logic Programs 1 The SLP System: An Implementation: An Implementation of Super Logic Programs 2 Super Logic Programs (1) #15; Arbitrarily nested propositional: An Implementation of Super Logic Programs 3 Super Logic Programs (2) #15; Default negation can be used only

Brass, Stefan

45

Extracellular Matrix-Regulated Gene Expression RequiresCooperation of SWI/SNF and Transcription Factors  

SciTech Connect (OSTI)

Extracellular cues play crucial roles in the transcriptional regulation of tissue-specific genes, but whether and how these signals lead to chromatin remodeling is not understood and subject to debate. Using chromatin immunoprecipitation (ChIP) assays and mammary-specific genes as models, we show here that extracellular matrix (ECM) molecules and prolactin cooperate to induce histone acetylation and binding of transcription factors and the SWI/SNF complex to the {beta}- and ?-casein promoters. Introduction of a dominant negative Brg1, an ATPase subunit of SWI/SNF complex, significantly reduced both {beta}- and ?-casein expression, suggesting that SWI/SNF-dependent chromatin remodeling is required for transcription of mammary-specific genes. ChIP analyses demonstrated that the ATPase activity of SWI/SNF is necessary for recruitment of RNA transcriptional machinery, but not for binding of transcription factors or for histone acetylation. Coimmunoprecipitation analyses showed that the SWI/SNF complex is associated with STAT5, C/EBP{beta}, and glucocorticoid receptor (GR). Thus, ECM- and prolactin-regulated transcription of the mammary-specific casein genes requires the concerted action of chromatin remodeling enzymes and transcription factors.

Xu, Ren; Spencer, Virginia A.; Bissell, Mina J.

2006-05-25T23:59:59.000Z

46

Implementation Guide for Use in Developing Technical Safety Requirements--Withdrawn  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

As part of the one-year accuracy review of the November 2010 change to the Guide, as required by DOE O 251.1C, Departmental Directives Program, Section 7, additional changes to the Guide were identified by the program offices to make it more complete and effective. Withdrawn 4-10-14.

2013-06-21T23:59:59.000Z

47

Nucleotide sequences required for the regulation of a rat alpha 2u-globulin gene by glucocorticoids.  

Science Journals Connector (OSTI)

...earlier experiments we showed that transfected c2u-globulin genes were expressed and regulated...accumulate four times the wild-type level of c2u-globulin mRNA in response to dexamethasone...required for the initiation and maintenance of c2u-globulin expression. These results suggest...

W R Addison; D T Kurtz

1986-07-01T23:59:59.000Z

48

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

49

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

E-Print Network [OSTI]

best practices when determining savings achieved by energy efficiencyenergy efficiency programs that are implemented by cities, states, utilities, companies, and similar entities. By using best practices

Schiller, Steven R.

2011-01-01T23:59:59.000Z

50

Implementing Executive Order 13423  

Broader source: Energy.gov [DOE]

Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423.

51

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

52

Greater-than-Class C low-level radioactive waste transportation regulations and requirements study. National Low-Level Waste Management Program  

SciTech Connect (OSTI)

The purpose of this report is to identify the regulations and requirements for transporting greater-than-Class C (GTCC) low-level radioactive waste (LLW) and to identify planning activities that need to be accomplished in preparation for transporting GTCC LLW. The regulations and requirements for transporting hazardous materials, of which GTCC LLW is included, are complex and include several Federal agencies, state and local governments, and Indian tribes. This report is divided into five sections and three appendices. Section 1 introduces the report. Section 2 identifies and discusses the transportation regulations and requirements. The regulations and requirements are divided into Federal, state, local government, and Indian tribes subsections. This report does not identify the regulations or requirements of specific state, local government, and Indian tribes, since the storage, treatment, and disposal facility locations and transportation routes have not been specifically identified. Section 3 identifies the planning needed to ensure that all transportation activities are in compliance with the regulations and requirements. It is divided into (a) transportation packaging; (b) transportation operations; (c) system safety and risk analysis, (d) route selection; (e) emergency preparedness and response; and (f) safeguards and security. This section does not provide actual planning since the details of the Department of Energy (DOE) GTCC LLW Program have not been finalized, e.g., waste characterization and quantity, storage, treatment and disposal facility locations, and acceptance criteria. Sections 4 and 5 provide conclusions and referenced documents, respectively.

Tyacke, M.; Schmitt, R.

1993-07-01T23:59:59.000Z

53

Regulations For Gas Companies (Tennessee) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regulations For Gas Companies (Tennessee) Regulations For Gas Companies (Tennessee) Regulations For Gas Companies (Tennessee) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Investor-Owned Utility Municipal/Public Utility Utility Program Info State Tennessee Program Type Environmental Regulations Safety and Operational Guidelines Provider Tennessee Regulatory Authority The Regulations for Gas Companies, implemented by the Tennessee Regulatory Authority (Authority) outline the standards for metering, distribution and electricity generation for utilities using gas. They follow the same equipment, metering reporting and customer relations standards as the Regulations for Electric Companies. In addition to these requirements these regulations outline purity requirements, pressure limits, piping

54

New Regulators for Quantum Field Theories with Compactified Extra Dimensions. II: Ultraviolet Finiteness and Effective Field Theory Implementation  

E-Print Network [OSTI]

In a previous companion paper [arXiv:0712.3532], we proposed two new regulators for quantum field theories in spacetimes with compactified extra dimensions. Unlike most other regulators which have been used in the extra-dimension literature, these regulators are specifically designed to respect the original higher-dimensional Lorentz and gauge symmetries that exist prior to compactification, and not merely the four-dimensional symmetries which remain afterward. In this paper, we use these regulators in order to develop a method for extracting ultraviolet-finite results from one-loop calculations. This method also allows us to derive Wilsonian effective field theories for Kaluza-Klein modes at different energy scales. Our method operates by ensuring that divergent corrections to parameters describing the physics of the excited Kaluza-Klein modes are absorbed into the corresponding parameters for zero modes, thereby eliminating the need to introduce independent counterterms for parameters characterizing different Kaluza-Klein modes. Our effective field theories can therefore simplify calculations involving Kaluza-Klein modes, and be compared directly to potential experimental results emerging from collider data.

Sky Bauman; Keith R. Dienes

2008-01-27T23:59:59.000Z

55

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) |  

Broader source: Energy.gov (indexed) [DOE]

NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE's power marketing activities, based on DOE's experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time, while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. 61 Fed Reg 64603: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222)

56

Both N-and C-lobes of calmodulin are required for Ca2+ regulations of CaV1.2 Ca2+  

E-Print Network [OSTI]

Both N- and C-lobes of calmodulin are required for Ca2+ -dependent regulations of CaV1.2 Ca2 December 2009 Keywords: Ca2+ channel Calmodulin Channel regulation Facilitation Inactivation a b s t r a c t We investigated the concentration- and Ca2+ -dependent effects of CaM mutants, CaM12 and CaM34

Turner, Ray

57

September 26, 2011, Department letter transmitting the Implementation Plan for Board Recommendation 2010-1, Safety Analysis Requirements for Defining Adequate Protection for the Public and the Workers.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 26, 2011 September 26, 2011 The Honorable Peter S. Winokur Chairman Defense Nuclear Facilities Safety Board 625 Indiana Avenue, NW, Suite 700 Washington, DC 20004-2941 Dear Mr. Chairman: Enclosed is the Department of Energy's Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2010-1, Safety Analysis Requirements for Defining Adequate Protection for the Public and the Workers. This Plan provides the Department's approach for updating its Documented Safety Analysis Standards and requirements to clarify them in regards to performance of hazard and accident analysis and the identification of safety controls. I have assigned Dr. James B. O'Brien, Acting Director, Office of Nuclear Safety in the Office of Health, Safety and Security, as the Department's Responsible

58

National radiation exposures and risks caused by implementing EPA`s proposed revised national primary drinking water regulations  

SciTech Connect (OSTI)

This report estimates risks to workers and the public associated with treatment processes and their associated waste products that would be mandated under proposed regulations of radium, radon, and uranium in drinking water. Three scenarios were examined: (1) all wastes flushed to the sanitary sewer; (2) all wastes disposed on land; (3) similar to (2) but radon removal by granulated activated carbon rather than packed tower aeration. Risks considered included accidental injury and cancer. Worker risks for both scenarios I and II were estimated to be 0.025 and 0.01 deaths per year of operation for radium-226 and radium-228, respectively. Worker risks for uranium were estimated to be 0.13 deaths/year of operation for scenario I and 0.5 deaths/year of operation for scenario II. Worker risks for radon removal were estimated to be 1.7 deaths/year of operation for scenario I and 2.2 deaths/year of operation for scenario II. Risks to the public for scenarios I and II for radium-226 were 4 {times} 10{sup {minus}4} and for radium-228 were 9 {times} 10{sup {minus}5} deaths/year of operation. Risks to the public for scenarios I and II for uranium were 7.3 {times} 10{sup {minus}2} and 2 {times} 10{sup {minus}4}, respectively. Risks to the public for scenario I and II for radon were 24 deaths/year of operation and for scenario III were nil. Public risks were quantified only for people exposed during a year of operation. For example, effects of public exposures in future years via groundwater contamination associated with landfill of treatment waste were not considered.

Morris, S.C.; Rowe, M.D.; Holtzman, S.; Meinhold, A.F.

1993-05-01T23:59:59.000Z

59

Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities  

SciTech Connect (OSTI)

Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

1998-12-31T23:59:59.000Z

60

Statutes, Regulations, and Directives for Classification Program |  

Broader source: Energy.gov (indexed) [DOE]

Classification » Statutes, Regulations, and Directives Classification » Statutes, Regulations, and Directives for Classification Program Statutes, Regulations, and Directives for Classification Program Classification Atomic Energy Act of 1954 - Establishes Government-wide policies for classifying, safeguarding, and declassifying Restricted Data information. 10 CFR Part 1045, Nuclear Classification and Declassification - Establishes the Government-wide policies and procedures for implementing sections 141 and 142 of the Atomic Energy Act of 1954 for classifying and declassifying RD and FRD and implements those requirements of Executive Order 12958 concerning NSI that affect the public. Executive Order 13526, Classified National Security Information - Prescribes the Government-wide system for classifying, safeguarding, and

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Implementation Guide for Use with 10 CFR Part 851, Worker Safety and Health Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides supplemental information and describes implementation practices to assist contractors in effectively developing, managing and implementing worker safety and health programs required by 10 Code of Federal Regulations, Part 851, Worker Safety and Health Program. Canceled by DOE G 440.1-1B.

2006-12-27T23:59:59.000Z

62

Activation of Nrf2 Is Required for Up-Regulation of the ? Class of Glutathione S-Transferase in Rat Primary Hepatocytes with l-Methionine Starvation  

Science Journals Connector (OSTI)

Activation of Nrf2 Is Required for Up-Regulation of the ? Class of Glutathione S-Transferase in Rat Primary Hepatocytes with l-Methionine Starvation ... Eight classes of GST isozymes have been identified in mammals, including ?, ?, ?, ?, ?, ?, ?, and ?.(13) The expression of several GST isozymes is inducible by a variety of chemicals, including carcinogens, dietary lipids, and phytochemicals. ... As shown, when cells were cultured with l-methionine-restricted medium for 8 or 24 h, the nuclear Nrf2 protein level was greater than that in cells with L-15-based medium (P < 0.05). ...

Ai-Hsuan Lin; Haw-Wen Chen; Cheng-Tze Liu; Chia-Wen Tsai; Chong-Kuei Lii

2012-06-07T23:59:59.000Z

63

Enforcement of DOE Classified Information Security Requirements Under Title  

Broader source: Energy.gov (indexed) [DOE]

of DOE Classified Information Security Requirements of DOE Classified Information Security Requirements Under Title 10, Code of Federal Regulations, Part 824 Enforcement of DOE Classified Information Security Requirements Under Title 10, Code of Federal Regulations, Part 824 In publishing 10 CFR Part 824, DOE has determined that civil penalties under Part 824 will only be assessed for violations of requirements for the protection of classified information (Restricted Data, Formerly Restricted Data and National Security Information). The rule does not include civil penalties relating to failure to protect sensitive but unclassified information. IMPLEMENTATION GUIDANCE More Documents & Publications Safety and Security Enforcement Process Overview Preliminary Notice, Battelle Energy Alliance, LLC, SEA-2011-01

64

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

65

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

66

EIA - Annual Energy Outlook 2008 - Legislation and Regulations  

Gasoline and Diesel Fuel Update (EIA)

Legislation and Regulations Legislation and Regulations Annual Energy Outlook 2008 with Projections to 2030 Legislation and Regulations Because analyses by EIA are required to be policy-neutral, the projections in AEO2008 are based on Federal and State laws and regulations in effect on or before December 31, 2007. The potential impacts of pending or proposed legislation, regulations, and standards-or of sections of legislation that have been enacted but that require implementing regulations or appropriation of funds that are not provided or specified in the legislation itself-are not reflected in the projections. Throughout 2007, however, at the request of the Administration and Congress, EIA has regularly examined the potential implications of proposed legislation in Service Reports (see "EIA Service Reports on Proposed Legislation Released Since January 2007").

67

10 CFR Part 1021 National Environmental Policy Act Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

21 21 Tuesday July 9, 1996 Part IV Department of Energy 10 CFR Part 1021 National Environmental Policy Act Implementing Procedures; Final Rule 36222 Federal Register / Vol. 61, No. 132 / Tuesday, July 9, 1996 / Rules and Regulations DEPARTMENT OF ENERGY 10 CFR Part 1021 RIN 1901-AA67 National Environmental Policy Act Implementing Procedures AGENCY: Department of Energy. ACTION: Final rule. SUMMARY: The Department of Energy (DOE) is amending its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994.

68

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) |  

Broader source: Energy.gov (indexed) [DOE]

61 Fed Reg 36222) 61 Fed Reg 36222) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) DOE amended its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. These amendments also incorporate changes necessary to conform to recent changes in DOE's missions, programs, and policies that have evolved in response to changing national priorities since the current regulations were issued in 1992. 61 Fed Reg 36222: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications

69

Pressure Safety Program Implementation at ORNL  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According to 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNLs Pressure Safety Program.

Lower, Mark [ORNL; Etheridge, Tom [ORNL; Oland, C. Barry [XCEL Engineering, Inc.

2013-01-01T23:59:59.000Z

70

Water Quality Standards Implementation (Oklahoma)  

Broader source: Energy.gov [DOE]

The Oklahoma Department of Environmental Quality regulates Oklahoma's Water Quality Standards. The law states the requirements and standards for point source discharges. It also establishes...

71

Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs.

Latham, A.R.; Evans, R.B.

1991-11-01T23:59:59.000Z

72

Transition Implementation Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

2001-04-24T23:59:59.000Z

73

10 CFR Part 1021 National Environmental Policy Act Implementing Procedures - Preamble to Final Rule  

Broader source: Energy.gov (indexed) [DOE]

Regulations Regulations 15122 DEPARTMENT OF ENERGY 10 CFR Part 1021 National Environmental Policy Act Implementing Procedures AGENCY: Department of Energy. ACTION: Final rule. SUMMARY: The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). DOE is also revoking its existing NEPA guidelines. This rule incorporates changes required by certain policy initiatives instituted by the Secretary of Energy to facilitate participation of the public and affected states in the NEPA process for proposed DOE actions.

74

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

75

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

76

EIA - AEO2010 - Legislation and Regulations  

Gasoline and Diesel Fuel Update (EIA)

Legislation and Regulations Legislation and Regulations Annual Energy Outlook 2010 with Projections to 2035 Legislation and Regulations Introduction The Reference case projections in AEO2010 generally assume that current laws and regulations affecting the energy sector remain unchanged throughout the projection period (including the implication that laws which include sunset dates do, in fact, become ineffective at the time of those sunset dates). The potential impacts of pending or proposed legislation, regulations, and standards—or of sections of legislation that have been enacted but that require regulations for which the implementing agency will exercise major discretion, or require appropriation of funds that are not provided or specified in the legislation itself—are not reflected in the Reference case projections. However, sensitivity cases that incorporate alternative assumptions about the future of existing policies subject to periodic updates also are included. The Federal and State laws and regulations included in AEO2010 are based on those in effect as of the end of October 2009. In addition, at the request of the Administration and Congress, EIA has regularly examined the potential implications of proposed legislation in Service Reports (see EIA Service Reports released since January 2009).

77

Library Regulations Library Regulations  

E-Print Network [OSTI]

Library Regulations 2012-13 Library Regulations UNIVERSITY OF BIRMINGHAM REGULATIONS LIBRARY REGULATIONS Preamble: The Library Regulations apply to all users of library facilities managed on behalf of the University by Library Services, and thus there are sections that apply also to non- members of the University

Birmingham, University of

78

General Responsibilities and Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

1999-07-09T23:59:59.000Z

79

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

80

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Aerospace NESHAP: A collaborative approach to implementation  

SciTech Connect (OSTI)

The purpose of the Aerospace National Emission Standard for Hazardous Air Pollutants (NESHAP) is to minimize emissions of hazardous air pollutants (HAPs) and volatile organic compounds (VOCs) from major sources who manufacture or rework aerospace vehicles or components. The NESHAP requires emission reductions through implementation of work practices, application of slower evaporating solvents and coatings with low-HAP and low-VOC content, usage of high transfer efficiency spray equipment, and installation of high capture efficiency exhaust filtration for coatings containing metals. The rule also requires extensive monitoring, recordkeeping, and self-reporting to track compliance. For existing sources the rule becomes effective September 1,1998. Over the past year the Puget Sound Air Pollution Control Agency (PSAPCA) has worked with the Boeing Company and EPA to identify the requirements of the aerospace NESHAP, understand what it means in everyday practice, and develop an enforcement strategy for ensuring compliance. A workshop was held with aerospace manufacturers, local regulators, and EPA to discuss implementation of the rule. Issues regarding compliance efforts and determinations were openly discussed. Subsequent to the workshop, PSAPCA and the Boeing Company participated in several mock inspections to review facility compliance efforts before the rule became effective. Collaborative efforts also ensued to develop operating permit monitoring requirements. Aerospace NESHAP requirements were incorporated into these permits. There are still questions regarding compliance determinations that must be further discussed and resolved. But by using the collaborative approach and having regulators and sources working together, there is a process to work out answers and approaches that will lead to an increased mutual understanding of the aerospace NESHAP and eventual compliance with the standard.

McAfee, M.; Lee, A.; Williamson, C.; Willenberg, J.

1998-12-31T23:59:59.000Z

82

Improving CS regulations.  

SciTech Connect (OSTI)

President Carter issued Executive Order 12044 (3/28/78) that required all Federal agencies to distinguish between significant and insignificant regulations, and to determine whether a regulation will result in major impacts. This study gathered information on the impact of the order and the guidelines on the Office of Conservation and Solar Energy (CS) regulatory practices, investigated problems encountered by the CS staff when implementing the order and guidelines, and recommended solutions to resolve these problems. Major tasks accomplished and discussed are: (1) legislation, Executive Orders, and DOE Memoranda concerning Federal administrative procedures relevant to the development and analysis of regulations within CS reviewed; (2) relevant DOE Orders and Memoranda analyzed and key DOE and CS staff interviewed in order to accurately describe the current CS regulatory process; (3) DOE staff from the Office of the General Counsel, the Office of Policy and Evaluation, the Office of the Environment, and the Office of the Secretary interviewed to explore issues and problems encountered with current CS regulatory practices; (4) the regulatory processes at five other Federal agencies reviewed in order to see how other agencies have approached the regulatory process, dealt with specific regulatory problems, and responded to the Executive Order; and (5) based on the results of the preceding four tasks, recommendations for potential solutions to the CS regulatory problems developed. (MCW)

Nesse, R.J.; Scheer, R.M.; Marasco, A.L.; Furey, R.

1980-10-01T23:59:59.000Z

83

Estradiol-Induced Object Memory Consolidation in Middle-Aged Female Mice Requires Dorsal Hippocampal Extracellular Signal-Regulated Kinase and Phosphatidylinositol 3-Kinase Activation  

E-Print Network [OSTI]

We previously demonstrated that dorsal hippocampal extracellular signal-regulated kinase (ERK) activation is necessary for 17?[beta]-estradiol (E2[E subscript 2]) to enhance novel object recognition in young ovariectomized ...

Lewis, Michael C.

84

Tidal Wetlands Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

Most activities occurring in or near tidal wetlands are regulated, and this section contains information on such activities and required permit applications for proposed activities. Applications...

85

Federal Energy Management Program: Energy Management Requirements by Law  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Management Energy Management Requirements by Law and Regulation to someone by E-mail Share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Facebook Tweet about Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Twitter Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Google Bookmark Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Delicious Rank Federal Energy Management Program: Energy Management Requirements by Law and Regulation on Digg Find More places to share Federal Energy Management Program: Energy Management Requirements by Law and Regulation on AddThis.com... Requirements by Subject Requirements by Regulation

86

Annual Energy Outlook with Projections to 2025- Legislation and Regulations  

Gasoline and Diesel Fuel Update (EIA)

Introduction Introduction Legislation and Regulations. Introduction Because analyses by the Energy Information Administration (EIA) are required to be policy-neutral, the projections in this Annual Energy Outlook 2004 (AEO2004) are based on Federal and State laws and regulations in effect on September 1, 2003. The potential impacts of pending or proposed legislation, regulations, and standards—or of sections of legislation that have been enacted but that require funds or implementing regulations that have not been provided or specified—are not reflected in the projections. Examples of Federal and State legislation incorporated in the projections include the following: The Energy Policy Conservation Act of 1975 The National Appliance Energy Conservation Act of 1987

87

Preparing for Project Implementation Financing Project Implementation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Project Implementation Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

88

NAC 445C.010 - Environmental Requirements | Open Energy Information  

Open Energy Info (EERE)

Environmental Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NAC 445C.010 - Environmental RequirementsLegal...

89

Aquifer Protection Area Land Use Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe allowable activities within aquifer protection areas, the procedure by which such areas are delineated, and relevant permit requirements. The regulations also describe...

90

Federal Requirements for Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations & Maintenance » Federal Requirements Operations & Maintenance » Federal Requirements for Operations and Maintenance Federal Requirements for Operations and Maintenance October 4, 2013 - 5:09pm Addthis The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving

91

DOE Nevada Operations Office Environmental Protection Implementation Plan, November 9, 1993--November 9, 1994  

SciTech Connect (OSTI)

DOE Order 5400.1, ``General Environmental Protection Program,`` established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter III of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Nevada Operations Office (DOE/NV) has prepared this fourth annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Environment, Safety, Security, & Health (AMESSH), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions.

Elle, D.R. [USDOE Nevada Operations Office, Las Vegas, NV (United States); Townsend, Y.E. [ed.; Latham, A.R.; Black, S.C. [Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States)

1993-11-01T23:59:59.000Z

92

Implementation of the Southern Company clean air compliance strategy  

SciTech Connect (OSTI)

The Clean Air Act with the 1990 Amendments is one of the most complex environmental laws to be enacted by Congress. It mandates a vast array of changes that have significantly increased the magnitude and complexity of clean air compliance for sources of air emissions, including coal-fired electric utilities across the US. The Southern Company was involved in the development of the amendments and recognized the necessity, even prior to the November 15, 1990, enactment, for an integrated clean air compliance strategy in order to be able to successfully implement the strategy within a relatively tight compliance timetable. The principle requirements of the amendments that currently affect coal-fired generating plants, and the primary focus of the strategy development and implementation process for The Southern Company, are found in Title IV--Acid Deposition Control. While Title IV contains elements of the traditional command and control approach to regulating nitrogen oxides (NO{sub x}) emissions and emissions monitoring, this title introduces an innovative market-based allowance system approach to regulating sulfur dioxide (SO{sub 2}) emissions. The development of the strategy and its implementation considered other final requirements of the 1990 Amendments, to the extent possible, as well as potential future environmental requirements. The weighing of the various compliance alternatives to develop a cost-effective strategy became and continues to be a major challenge for The Southern Company and other electric utilities. Within The Southern Company, a multidisciplined project team and numerous task forces have continued to review the strategy and its implementation against changes in a number of key drivers including fuel prices, technology costs, expected allowance values, and regulatory developments. This approach provides the flexibility to match a dynamic environment with the appropriate compliance alternatives.

Boyd, K.; Herrin, W.D. [Southern Company Services, Birmingham, AL (United States)

1995-12-31T23:59:59.000Z

93

NISTIR 7933 Requirements and  

E-Print Network [OSTI]

NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type 18 #12;ii NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type/CTS designed to test implementations of ANSI/NIST-ITL 1- 2011 (AN-2011) "Data Format for the Interchange

94

Surveillance Guide - CMS 3.1 Configuration Management Implementation  

Broader source: Energy.gov (indexed) [DOE]

CONFIGURATION MANAGEMENT IMPLEMENTATION CONFIGURATION MANAGEMENT IMPLEMENTATION 1.0 Objective The objective of this surveillance is to verify implementation of configuration management requirements. These surveillance activities provide a basis for evaluating the effectiveness of the contractor's program for implementation and control of configuration management and for establishing compliance with DOE requirements. References 2.1 DOE 430.1, Life Cycle Project Management 2.2 DOE-STD-1073-93, Guide for Operational Configuration Management 3.0 Requirements Implemented This surveillance is conducted to implement requirements of the Functions, Responsiblities and Authorities Manual (FRAM), Section 2, Configuration Management, FRAM #s 3 and 4. These requirements are

95

Alternative Fuels Data Center: Biofuel Blending Capability Requirements and  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biofuel Blending Biofuel Blending Capability Requirements and Regulations to someone by E-mail Share Alternative Fuels Data Center: Biofuel Blending Capability Requirements and Regulations on Facebook Tweet about Alternative Fuels Data Center: Biofuel Blending Capability Requirements and Regulations on Twitter Bookmark Alternative Fuels Data Center: Biofuel Blending Capability Requirements and Regulations on Google Bookmark Alternative Fuels Data Center: Biofuel Blending Capability Requirements and Regulations on Delicious Rank Alternative Fuels Data Center: Biofuel Blending Capability Requirements and Regulations on Digg Find More places to share Alternative Fuels Data Center: Biofuel Blending Capability Requirements and Regulations on AddThis.com... More in this section...

96

Influence factors of effects of Chinese coal mine safety regulations in different stages  

Science Journals Connector (OSTI)

Through measuring the effects of coal mine safety regulations in what we have termed the recovering stage, the advancing stage with exploration, and the gradually stable stage, the different effects and their reasons are analysed and explained for the years 1980-2010. The study indicates that coal mine safety management began to recover from 1980-1990. However the death rate was stubbornly high. The implementation of safety regulations during the advancing stage reduced the incidence of mortality. However, the government policy in China became more focused on economic development, and the shortfall in energy fuel production resulted in a dramatic increase in the number of small coal mines. After 2000, the supervision system gradually stabilised and the regulations were improved, significantly reducing the mortality rate. By 2010, the mortality rate was China's lowest for 30 years. So a complete, stable supervision system is required for regulations to be implemented effectively.

Qun Feng; Hong Chen

2013-01-01T23:59:59.000Z

97

PART 1021-NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES  

Broader source: Energy.gov (indexed) [DOE]

Effective Nov 14, 2011 1 Effective Nov 14, 2011 1 PART 1021-NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Subpart A-General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activities. Subpart B-DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on actions during the NEPA process. 1021.212 Research, development, demonstration, and testing. 1021.213 Rulemaking. 1021.214 Adjudicatory proceedings. 1021.215 Applicant process. 1021.216 Procurement, financial assistance, and joint ventures. Subpart C-Implementing Procedures 1021.300 General requirements. 1021.301 Agency review and public participation.

98

10 CFR 1021 -- National Environmental Policy Act Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

1021 -- NATIONAL 1021 -- NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Subpart A -- General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activities. Subpart B -- DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on actions during the NEPA process. 1021.212 Research, development, demonstration, and testing. 1021.213 Rulemaking. 1021.214 Adjudicatory proceedings. 1021.215 Applicant process. 1021.216 Procurement, financial assistance, and joint ventures. Subpart C -- Implementing Procedures 1021.300 General requirements. 1021.301 Agency review and public participation. 1021.310 Environmental impact statements.

99

Implementation, Certification and Enforcement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Implementation, Certification Implementation, Certification and Enforcement Implementation, Certification and Enforcement The U.S. Department of Energy (DOE) is authorized by the Energy Policy and Conservation Act of 1975 (as amended) to enforce compliance with the energy and water conservation standards established for certain consumer products and commercial and industrial equipment. To ensure the implementation of the current standards for covered appliances and equipment, DOE has published certification, compliance, and enforcement regulations for these products and equipment in the Code of Federal Regulations (CFR) at 10 CFR part 429. Please note that the previous link is to the Electronic Code of Federal Regulations (e-CFR), which is a version of the CFR updated daily. It is not an official legal edition of

100

Rules and Regulations for Hazardous Waste Management (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations establish permitting and operational requirements for hazardous waste facilities. They are designed to minimize...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Implementing the National Broadband  

Broader source: Energy.gov (indexed) [DOE]

Before the Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy NBP RFI: Communications Requirements COMMENTS OF BALTIMORE GAS & ELECTRIC COMPANY I. Introduction BGE is the nation's oldest and most experienced utility company. It has met the energy needs of central Maryland for nearly 200 years. Today, it serves more than 1.2 million business and residential electric customers, and approximately 650,000 gas customers in an economically diverse, 2,300-square-mile area encompassing Baltimore City and all or part of ten central Maryland counties.

102

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

103

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

104

HSPD-12 Implementation Status Report Updated Date:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

105

Implementing for Implementing Executive Order 13423  

Broader source: Energy.gov (indexed) [DOE]

IMPLEMENTING EXECUTIVE IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" March 29, 2007 0 Contents I. Introduction ......................................................................................................................1 A. Purpose..................................................................................................................1 B. Authority ...............................................................................................................1 C. Organization and Oversight ..................................................................................1 D. Overarching Policy and Directives .......................................................................4

106

Federal Energy Management Program: Federal Requirements for Operations and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Maintenance Operations and Maintenance The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving metering requirements, and any determination by the agency that advanced meters or metering systems are not practical in their specific situation.

107

Laws and Regulations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Laws and Regulations Laws and Regulations Laws and Regulations Federal laws and regulations set multiple energy management requirements for Federal agencies spanning energy efficiency, renewable energy, water conservation, and alternative fuel use. This section outlines Federal energy management authorities through: Requirements by Subject Requirements by Regulation. The Federal Energy Management Program (FEMP) analyzes energy management authorities and develops rules and guidance to help Federal agencies comply with applicable requirements. Reporting requirements and Federal Government performance reports are also available through: Notices and Rules Facility Reporting Fleet Reporting. EISA 432 Compliance Tracking Track Federal agency progress toward Section 432 of the Energy Independence and Security Act (EISA) of 2007 using FEMP's EISA 432

108

CERTIFICATION REQUIREMENTS IN THE CALIFORNIA ENERGY COMMISSION'S  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION CERTIFICATION REQUIREMENTS IN THE CALIFORNIA ENERGY COMMISSION'S APPLIANCE REGULATIONS: A Summary Guide, Including Forms for Manufacturers, Trade Associations, and Other ...............................................................................................................1 III. Where to Find the Energy Commission Appliance Efficiency Regulations .....2 IV. Where to Get

109

GUIDANCE REGARDING NEPA REGULATIONS  

Broader source: Energy.gov (indexed) [DOE]

This memorandum was published in the Federal Register and appears at 48 Fed. Reg. 34263 (1983). Ed. Note] This memorandum was published in the Federal Register and appears at 48 Fed. Reg. 34263 (1983). Ed. Note] GUIDANCE REGARDING NEPA REGULATIONS 40 CFR Part 1500 Executive Office of the President Council on Environmental Quality 722 Jackson Place, N.W. Washington, D.C. 20006 July 22, 1983 Memorandum For: Heads of Federal Agencies From: A. Alan Hill, Chairman Re: Guidance Regarding NEPA Regulations The Council on Environmental Quality (CEQ) regulations implementing the National Environmental Policy Act (NEPA) were issued on November 29, 1978. These regulations became effective for, and binding upon, most federal agencies on July 30, 1979, and for all remaining federal agencies on November 30, 1979. As part of the Council's NEPA oversight responsibilities it solicited through an August 14,

110

Virginia State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Virginia Virginia State Regulations: Virginia State of Virginia The Division of Gas and Oil in the Virginia Department of Mines, Minerals and Energy (DMME) regulates the effects of gas and oil operations both on and below the surface. The Virginia Gas and Oil Board is to foster, encourage, and promote the safe and efficient exploration for and development, production, and utilization of gas and oil resources. Otherwise, three regulatory citizen boards are responsible for adopting Virginia 's environmental regulations. The Virginia Department of Environmental Quality (DEQ) staff administers the regulations as approved by the boards. Finally, the U.S. Environmental Protection Agency (EPA) Region 3, through its Water Protection Division, administers Class II underground injection control (UIC) programs in Virginia in direct implementation.

111

IPv6 Implementation Checklist  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IPv6 Implementation Checklist Engineering Services The Network OSCARS Fasterdata IPv6 Network IPv6 Implementation Checklist ESnet IPv6 Mirror Servers ESnet IPv6 History ESnet...

112

Frequency Control Performance Measurement and Requirements  

E-Print Network [OSTI]

changes in dispatch to follow load, implement interchangerequired for load frequency regulation, it follows that afollows [4]: System frequency deviation and the resulting time error indicated the total imbalance of generation and load

Illian, Howard F.

2011-01-01T23:59:59.000Z

113

Antidegredation Implementation Methods (Mississippi) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Antidegredation Implementation Methods (Mississippi) Antidegredation Implementation Methods (Mississippi) Antidegredation Implementation Methods (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Mississippi Program Type Environmental Regulations Siting and Permitting Provider Mississippi Department of Environmental Quality

114

RPAM & Energy Order Requirements | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy Order Requirements More Documents & Publications Three Year Rolling Timeline U.S. Department of Energy High Performance and Sustainable Buildings Implementation Plan Slide 1...

115

California Energy Commission's AB 118 Implementation Timeline  

E-Print Network [OSTI]

* Assumes that public comment/Commission review will not result in changes to regulatory language that would Investment Plan August 26, 2008 Post AB 118 Implementation Timeline for September 2, 2008, Staff Workshop with Advisory Committee Members September 9, 2008 Committee Workshop to Review Revised Draft Regulation Language

116

Governing the gap: Forging safe science through relational regulation  

E-Print Network [OSTI]

Designed to close the ubiquitous gap between law on the books and law in action, management systems locate the standard setting and implementation of regulation within the regulated organization itself. Despite efforts to ...

Huising, Ruthanne

117

Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules, regulations and orders relating to nuclear safety (DOE Nuclear Safety Requirements).

118

Wireless System Considerations When Implementing NERC Critical  

Broader source: Energy.gov (indexed) [DOE]

Wireless System Considerations When Implementing NERC Critical Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Energy asset owners are facing a monumental challenge as they address compliance with the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) Standards (CIP-002 through CIP-009). The increased use of wireless technologies and their introduction into control center networks and field devices compound this challenge, as ambiguity exists regarding the applicability of the CIP requirements to wireless networking technologies. Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards More Documents & Publications

119

Implementation of Title V in California  

SciTech Connect (OSTI)

This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

Werner, B.; Cook, B.

1996-12-31T23:59:59.000Z

120

States with NEPA-like Environmental Planning Requirements  

Broader source: Energy.gov [DOE]

Several states have environmental planning requirements that are similar to NEPA. These requirements are either State laws, regulations, or executive orders. Please click below for additional...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Transcriptional regulation constrains the organization of genes on eukaryotic chromosomes  

E-Print Network [OSTI]

Transcriptional regulation constrains the organization of genes on eukaryotic chromosomes Sarath. Although it is known that eukaryotic transcriptional regulation is complex and requires an intricate-order organization of genes across and within chromosomes that is constrained by transcriptional regulation

Babu, M. Madan

122

Data quality objective for regulatory requirements for dangerous waste sampling and analysis  

SciTech Connect (OSTI)

Contains requirements for sampling and analysis to meet the dangerous (hazardous) waste regulations.

Mulkey, C.H., Westinghouse Hanford

1996-07-02T23:59:59.000Z

123

ORISE: Policy Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program...

124

Re: Implementing the National Broadband Plan by Studying the...  

Broader source: Energy.gov (indexed) [DOE]

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: Implementing the National Broadband Plan by Studying the Communications...

125

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

126

Implementing AccountableCare  

E-Print Network [OSTI]

Implementing AccountableCare Organizations POLICYBRIEF MAY2010 ADVANCING NATIONAL HEALTH REFORMPolicyandClinicalPractice #12;i Berkeley Center on Health, Economic & Family Security|Implementing Accountable Care to implement the newly-minted comprehensive healthcare reform law, the Patient Protection and Affordable Care

Kammen, Daniel M.

127

Technical Safety Requirements  

Broader source: Energy.gov (indexed) [DOE]

Safety Requirements Safety Requirements FUNCTIONAL AREA GOAL: Contractor has developed, maintained, and received DOE Field Office Approval for the necessary operating conditions of a facility. The facility has also maintained an inventory of safety class and safety significant systems and components. REQUIREMENTS:  10 CFR 830.205, Nuclear Safety Rule.  DOE-STD-3009-2002, Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses.  DOE-STD-1186-2004, Specific Administrative Controls. Guidance:  DOE G 423.1-1, Implementation Guide for Use in Developing Technical Safety Requirements.  NSTP 2003-1, Use of Administrative Controls for Specific Safety Functions. Performance Objective 1: Contractor Program Documentation

128

Kansas Air Quality Regulations (Kansas)  

Broader source: Energy.gov [DOE]

All new air contaminant emission sources or alterations to emission sources that are required to be reported shall be in compliance with all applicable emission control regulations at the time that...

129

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

130

Plans, Implementation, and Results | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

About the Program » Plans, Implementation, and Results About the Program » Plans, Implementation, and Results Plans, Implementation, and Results October 8, 2013 - 1:23pm Addthis The U.S. Department of Energy's Federal Energy Management Program (FEMP) works with key individuals to accomplish energy change within organizations by bringing expertise from all levels of project and policy implementation to enable Federal agencies to meet energy-related goals and provide energy leadership to the country. This Web page includes links to documents that support the office management process and the results and public benefits that derive from it. Overview Learn more about this EERE office. Key Office Documents FEMP Overview Legislative and Executive Guidance FEMP Laws and Regulations Structure and Key Contacts FEMP Contacts

131

State Waste Discharge Permit ST-4502 Implementation Plan  

SciTech Connect (OSTI)

Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

BROWN, M.J.; LECLAIR, M.D.

2000-09-27T23:59:59.000Z

132

Algorithms and Hardware for Implementing Artificial Neural Networks Nathan Hower  

E-Print Network [OSTI]

Algorithms and Hardware for Implementing Artificial Neural Networks Nathan Hower Abstract Complex problems require sophisticated processing techniques. Artificial neural networks are based require a parallel processing approach to be computed at practical speeds. Artificial neural networks

133

VLSI Implementation of Low Power Reconfigurable MIMO Detector  

E-Print Network [OSTI]

, latency and throughput of these systems need further improvements to meet standard requirements. Additionally, most of these implementations dont deal with the requirements of reconfigurability of the detector to multiple modulation schemes and different...

Dash, Rajballav

2009-12-02T23:59:59.000Z

134

Federal Energy Management Program: Laws and Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laws and Laws and Regulations to someone by E-mail Share Federal Energy Management Program: Laws and Regulations on Facebook Tweet about Federal Energy Management Program: Laws and Regulations on Twitter Bookmark Federal Energy Management Program: Laws and Regulations on Google Bookmark Federal Energy Management Program: Laws and Regulations on Delicious Rank Federal Energy Management Program: Laws and Regulations on Digg Find More places to share Federal Energy Management Program: Laws and Regulations on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules Guidance Facility Reporting Fleet Reporting Laws and Regulations EISA 432 Compliance Tracking Track Federal agency progress toward Section 432 of the Energy Independence and Security Act (EISA) of 2007 using FEMP's EISA 432 Compliance Tracking

135

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

QA Program, the applicable QA requirements, and the responsibility for the implementationQA capability as determined by evaluation of the facilities and implementation of the QA program.QA personnel and having line authority for the implementation of the QA program.

Albert editor, R.

2009-01-01T23:59:59.000Z

136

Air Pollution Control Regulations: No. 9- Air Pollution Control Permits (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations describe permitting procedures and requirements for minor and major sources of emissions.

137

Alabama Compliance Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alabama Alabama Compliance Implementation and Evaluation (CIE) Guide BUILDING TECHNOLOGIES PROGRAM COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 2 This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings. COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 3 Alabama WHAT'S INSIDE CIE Guide Overview-Flow Diagram ........................................................................................................................... 5 PART 1: Guide Overview .................................................................................................................................................

138

March 7, 2012, USW Health Safety and Environment Conference Presentations - 851 Rule Implementation Improvement Efforts  

Broader source: Energy.gov (indexed) [DOE]

851 Rule Implementation 851 Rule Implementation Improvement Efforts Bill McArthur Director, Office of Worker Safety and Health Policy Office of Health, Safety and Security U.S. Department of Energy USW Health, Safety and Environment Conference HSS Workshop March 7, 2012 2 10 CFR 851~ Worker Safety and Health Program 3 10 CFR 851 ~ Background *Jan 23, 2002 ~ Bob Stump National Defense Authorization Act for Fiscal Year 2003 * Amend Atomic Energy Act, new Section 234 C require Secretary to promulgate regulations for worker safety and health * Based on DOE O 440.1A, Worker Protection Management for DOE Federal and Contractor Employees * Applies Only to Contractors covered under the AEC *10 CFR 851, Worker Safety and Health Program * February 9, 2006 ~ published in federal register

139

October 2014 Implementation Manual  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

system is reviewed for potential efficiency improvements including lower flows, reduced pipeline friction and repair of leaks. Implementation Manual (10114) - Section 6:...

140

Required Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

142

February 28, 2006, Department letter reporting completion of NNSA portion of Commitment 23 in the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations, which requires the development of site office action plans to improve the consistency and reliability of work planning and work control at the activity level, including the incorporation of Integrated Safety Management core functions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Washington, DC 20585 Washington, DC 20585 February 28, 2006 OFFICE O F THE ADMINISTRATOR The Honorable A. J. Eggenberger Ch a i rm an Defensc Nuclear Facilities Safety Board 625 Indiana Avenue, NW., Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: On Julie 10, 2005, Secretary Bodnian submitted the Department's Iiizplenzentution Plun to Itizpt-ove Oversight qf'Nucleur Operutions in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004- I , Oversight qf Complex, High-Hrrzurd Nucleur Openrtiotzs. Section 5.3 of the Implementation Plan (IP) addresses Revitalizing Integruted SU/i-'ty Munagernent Implementution, and Subsection 5.3.2 addresses Work Plunning mil Work Control ut the Activity Level. Commitment 23 of the 1P requires development of site office action plans to improve the consistency and reliability of work

143

Federal Energy Management Program: Laws & Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laws and Regulations Laws and Regulations EISA 432 Compliance Tracking Track Federal agency progress toward Section 432 of the Energy Independence and Security Act (EISA) of 2007 using FEMP's EISA 432 Compliance Tracking System. Federal laws and regulations set multiple energy management requirements for Federal agencies spanning energy efficiency, renewable energy, water conservation, and alternative fuel use. This section outlines Federal energy management authorities through: Requirements by Subject: Find regulatory requirements and related guidance by topic area. Requirements by Regulation: Take an in-depth look at individual laws and regulations. The Federal Energy Management Program (FEMP) analyzes energy management authorities and develops rules and guidance to help Federal agencies comply with applicable requirements. Reporting requirements and Federal Government performance reports are also available through:

144

Incentive regulation of investor-owned nuclear power plants by public utility regulators. Revision 1  

SciTech Connect (OSTI)

The US Nuclear Regulatory Commission (NRC) periodically surveys the Federal Energy Regulatory Commission (FERC) and state regulatory commissions that regulate utility owners of nuclear power plants. The NRC is interested in identifying states that have established economic or performance incentive programs applicable to nuclear power plants, how the programs are being implemented, and in determining the financial impact of the programs on the utilities. The NRC interest stems from the fact that such programs have the potential to adversely affect the safety of nuclear power plants. The current report is an update of NUREG/CR-5975, Incentive Regulation of Investor-Owned Nuclear Power Plants by Public Utility Regulators, published in January 1993. The information in this report was obtained from interviews conducted with each state regulatory agency that administers an incentive program and each utility that owns at least 10% of an affected nuclear power plant. The agreements, orders, and settlements that form the basis for each incentive program were reviewed as required. The interviews and supporting documentation form the basis for the individual state reports describing the structure and financial impact of each incentive program.

McKinney, M.D.; Seely, H.E.; Merritt, C.R.; Baker, D.C. [Pacific Northwest Lab., Richland, WA (United States)

1995-04-01T23:59:59.000Z

145

Colorado State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Colorado Colorado State Regulations: Colorado State of Colorado The Colorado Oil and Gas Conservation Commission (COGCC), a division of the Department of Natural Resources (DNR), regulates oil and gas activities in Colorado. The COGCC has broad statutory authority with respect to impacts on any air, water, soil, or biological resources resulting from oil and gas operations. The COGCC implements the state ground water standards and classifications as they relate to oil and gas exploration and production (E&P) activities. The COGCC has jurisdiction for all Class II injection wells except those on Indian lands. The COGCC has jurisdiction for the management of all E&P wastes except at commercial disposal facilities. The Colorado Department of Public Health and Environment (CDPHE) administers the environmental protection laws related to air quality, waste discharge to surface water, and commercial disposal facilities.

146

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

147

Implementation Guide for Developing Technical Safety Requirements (Informational Purposes Only)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This draft has been scheduled for final review before the Directives Review Board on 2/19/2015. All major comments and concerns should be provided to your DRB representative by 2/17/2015, following your organization process. If you do not know who your representative is, please see the list of DRB members. If your office is represented by Ingrid Kolb, Director, Office of Management, please submit your major concerns and comments to the DRB Liaison, Camille Beben (Camille.Beben@hq.doe.gov; 202-586-1014).

2015-02-10T23:59:59.000Z

148

page 1 of 4 Implementation of Document Control Requirements  

E-Print Network [OSTI]

and international standards ISO 9001:2008 and ISO 14001:2004. These documents may be of internal or external origin

Kemner, Ken

149

Government Regulation  

E-Print Network [OSTI]

Abstract. Interest in the use of so-called voluntary approaches to supplement or replace formal environmental regulation is on the rise, both in Europe and in the United States. These approaches fall into two general ...

Ashford, Nicholas

2005-01-01T23:59:59.000Z

150

Waste generator services implementation plan  

SciTech Connect (OSTI)

Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

Mousseau, J.; Magleby, M.; Litus, M.

1998-04-01T23:59:59.000Z

151

Guidance & Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Guidance & Requirements Guidance & Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies applicable to NEPA proposed actions. Requirements A collection of statutes, Council on Environmental Quality regulations, Department of Energy regulations, and Executive Orders applicable to NEPA proposed actions. Lessons Learned Quarterly Report A collection of guidance, case studies, analyses, references, litigation

152

Implementation Proposal for  

Broader source: Energy.gov (indexed) [DOE]

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

153

Unveiling the Implementation Guide  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory www.ornl.gov Oak Ridge National Laboratory www.ornl.gov Unveiling the Implementation Guide October 11, 2011 Michaela Martin Program Manager Residential, Commercial, and Industrial Energy Efficiency Oak Ridge National Laboratory 2 | Oak Ridge National Laboratory www.ornl.gov Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations * New resource for industry * Identifies key principles and actions that lead to successful implementation of energy assessment recommendations * Connects readers with a variety of trusted resources * Simple tools for supporting energy management programs and continuous energy performance improvement efforts * Available in hard copy and on the web Implementation Guide Overview 3 | Oak Ridge National Laboratory www.ornl.gov

154

Implementing Turtle Graphics...  

Science Journals Connector (OSTI)

Turtle Graphics were invented by Seymour Papert in ... drawn on the screen by an (imaginary) turtle which happens to be carrying a pen ... trace is left. In some implementations the turtle is a robot, and the nam...

Robin Jones; Ian Stewart

1987-01-01T23:59:59.000Z

155

INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE  

Broader source: Energy.gov (indexed) [DOE]

March 29, 2007 INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" i Contents I. Introduction ......................................................................................................................1 A. Purpose..................................................................................................................1 B. Authority ...............................................................................................................1 C. Organization and Oversight ..................................................................................1 D. Overarching Policy and Directives .......................................................................4

156

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

157

Identifying Non-Federal Cooperating Agencies in Implementing the Procedural  

Broader source: Energy.gov (indexed) [DOE]

Identifying Non-Federal Cooperating Agencies in Implementing the Identifying Non-Federal Cooperating Agencies in Implementing the Procedural Requirements of NEPA Identifying Non-Federal Cooperating Agencies in Implementing the Procedural Requirements of NEPA The purpose of this Council on Environmental Quality Memorandum is to ensure that all federal and non-federal cooperating agencies are identified on the cover sheet of each Environmental Impact Statement (EIS) prepared by your agency. G-CEQ-IdentnonfedCooperatingAgencies.pdf More Documents & Publications Designation of Non-Federal Agencies as Cooperating Agencies Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act

158

Criticality Safety Controls Implementation Inspection Criteria, Approach,  

Broader source: Energy.gov (indexed) [DOE]

Criticality Safety Controls Implementation Inspection Criteria, Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) DOE has set expectations for implementing criticality safety controls that are selected to provide preventive and/or mitigative functions for specific potential accident scenarios. There are additional expectations for criticality safety controls that are also designated as Specific Administrative Controls (SACs) (see HSS CRAD 64-32). Also, in instances when the review addresses functionality and operability of structures, systems, and components (SSCs) of nuclear facilities specifically required

159

Solid Waste and Infectious Waste Regulations (Ohio) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and Infectious Waste Regulations (Ohio) and Infectious Waste Regulations (Ohio) Solid Waste and Infectious Waste Regulations (Ohio) < Back Eligibility Utility Agricultural Investor-Owned Utility Industrial Municipal/Public Utility Local Government Rural Electric Cooperative Program Info State Ohio Program Type Environmental Regulations Provider Ohio Environmental Protection Agency This chapter of the law that establishes the Ohio Environmental Protection Agency establishes the rules and regulations regarding solid waste. The chapter establishes specific regulations for biomass facilities, which includes permitting, siting, operation, safety guidelines, and closing requirements. Siting regulations include setbacks from waste handling areas for state facilities (1000 feet from jails, schools), requirements for not siting

160

SPATIAL DATA MINING IMPLEMENTATION Alternatives and perfermances  

E-Print Network [OSTI]

SPATIAL DATA MINING IMPLEMENTATION Alternatives and perfermances NADJIM CHELGHOUM, KARINE ZEITOUNI Abstract: Spatial data mining requires the analysis of the interactions in space. These interactions can be materialized using distance tables, reducing spatial data mining to multi-table analysis. However, conventional

Zeitouni, Karine

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Division of Water, Part 675: Great Lakes Water Withdrawal Registration Regulations (New York)  

Broader source: Energy.gov [DOE]

These regulations set forth requirements for the registration of water withdrawals and reporting of water losses from the Great Lakes Basin. The regulations apply to water withdrawals from...

162

Siting Requirements for Anaerobic Lagoons (Iowa)  

Broader source: Energy.gov [DOE]

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

163

Grand Gulf-prioritization of regulatory requirements  

SciTech Connect (OSTI)

As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit.

Meisner, M.J. (Entergy Operations Inc., Port Gibson, MS (United States))

1993-01-01T23:59:59.000Z

164

Regulation 28: Library REGULATION 28: LIBRARY  

E-Print Network [OSTI]

Regulation 28: Library 180 REGULATION 28: LIBRARY The purpose of this Regulation is to safeguard the common interests of all Library users. All persons are admitted on the understanding that they have read and agreed to observe the Library Regulations. Breach of this Regulation could result in membership being

Sussex, University of

165

NEPA Implementation Procedures; Appendices I, II, and III  

Broader source: Energy.gov (indexed) [DOE]

_ _ _ _ _ _ _ _ ~ - Friday December 21, 1984 DOE Note: Some contact information may be outdated. Refer to the current edition of Directory o f Potential Stakeholders for Department of Energy Actions under the National Environmental Policy Act (updated annually). Part 11 Council on Environmental Quality 40 CFR Ch. V National Environmental Policy Act (NEPA) Implementation Procedures; Appendices I, II, and 111; Final Rule 49750 Federal Register I Vol. 49, No. 247 / Friday, December 21, 1984 I Rules and Regulations COUNCIL ON ENVIRONMENTAL QUALITY 40 CFRCh. V National Envircnmental Policy Act (NEPA) Implementation Procedures; Appendices I, I!, and lli AGENCY: Council on Environmental Quality, Executive Office of the President. ACTION: Appendices to regulations,

166

Independent Oversight Activity Report for Follow-up on the Progress and Issues in the Implementation of the Los Alamos National Laboratory Worker Exposurre Assessment Process, November 26, 2013  

Broader source: Energy.gov (indexed) [DOE]

Report Number: HIAR LANL-2013-11-26 Site: Los Alamos National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Follow-up on the Progress and Issues in the Implementation of the Los Alamos National Laboratory Worker Exposure Assessment Process Dates of Activity : 11/26/2013 Report Preparer: James Lockridge, Certified Industrial Hygienist Activity Description/Purpose: This activity reviewed progress and issues in the development and implementation of the Los Alamos National Laboratory (LANL) industrial hygiene (IH) worker exposure assessment program. LANL Worker Exposure Program: 10 Code of Federal Regulation (CFR) 851 requires LANL to assess worker

167

PICs Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

168

Implementing the National Broadband  

Broader source: Energy.gov (indexed) [DOE]

Type text] Type text] Response to Request for Information from the Department of Energy: Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy [FR Doc. 2010-11127] July 12, 2010 EnerNOC Page 2 of 8 EnerNOC, Inc. ("EnerNOC") is pleased to provide these comments to the Department of Energy in response to the Request for Information "Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy." EnerNOC is a provider of demand response and energy efficiency solutions to utilities, Independent

169

Permanent Markers Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

170

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

171

CLASS DEVIATION FINDINGS AND DETERMINATION Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement  

Broader source: Energy.gov (indexed) [DOE]

Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement at Federal Acquisition Regulation (FAR) 9.406-3(f)(1) and 9.407-3(e)(1) Findings 1. On March 23,2010, the FAR Council published a final rule in the Federal Register (75FR 14058), which amended FAR 9.4 to implement section 872 of the Duncan Hunter National Defense Authorization Act for FISCAL Year 2009. Section 872 requires the establishment of a data system containing specific information on the integrity and performance of covered Federal agency contractors and grantees. The data system created for this purpose is entitled Federal Awardee Performance and Integrity Information Systems (FAPIIS), and it can be located at www.ppirs.gov and www.cpars.csd.disa.mil.

172

Surveillance Guide - NSS 18.2 Technical Safety Requirements  

Broader source: Energy.gov (indexed) [DOE]

TECHNICAL SAFETY REQUIREMENTS TECHNICAL SAFETY REQUIREMENTS 1.0 Objective The objective of this surveillance is to examine the contractor's implementation of technical safety requirements. The surveillance does not address the development of these requirements since this activity is programmatic. The surveillance focuses on ensuring that the contractor has developed and implemented the necessary procedures and administrative controls to ensure that compliance with the Technical Safety Requirements is maintained. 2.0 References 2.1 10 CFR 830.205, Technical Safety Requirements 2.2 DOE 5480.20A Personnel Selection, Qualification, and Training Requirements for DOE Nuclear Facilities 3.0 Requirements Implemented This surveillance is conducted to implement requirements NS-

173

Forest Road Building Regulations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » Forest Road Building Regulations Forest Road Building Regulations < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Schools Retail Supplier Institutional Fuel Distributor Nonprofit Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 09/2010 State Wisconsin Program Type Environmental Regulations The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading, stormwater, and

174

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

175

IMPLEMENTATION_PLAN_FINAL.cdr  

Broader source: Energy.gov (indexed) [DOE]

2 2 Environmental Justice Five-Year Implementation Plan ENERGY U.S. DEPARTMENT OF Table of Contents Forward . . . . . . . . . . . . . . . . . . . . . . . 1 Introduction . . . . . . . . . . . . . . . . . . . 2 Vision Statement. . . . . . . . . . . . . . . . 5 Environmental Justice Core Principles. . . . . . . . . . . . . . . . . . 5 Goal 1 . . . . . . . . . . . . . . . . . . . . . . . 6 Goal 2 . . . . . . . . . . . . . . . . . . . . . . . . 7 Goal 3 . . . . . . . . . . . . . . . . . . . . . . 10 Goal 4 . . . . . . . . . . . . . . . . . . . . . . . 11 Summary and Conclusion . . . . . . . . 12 Forward The Department of Energy (DOE) sets an ambitious Departmental agenda that will guide our environmental justice activities for the next five years. It sets forth an aggressive agenda, and is required to do so if we are to meet the environmental justice demands that are spelled out in Presidential Executive Order 12898 and the Department's . This is our initial attempt to prepare a plan of this nature. It will support Departmental environmental

176

Energy storage for frequency regulation on the electric grid  

E-Print Network [OSTI]

Ancillary services such as frequency regulation are required for reliable operation of the electric grid. Currently, the same traditional thermal generators that supply bulk power also perform nearly all frequency regulation. ...

Leitermann, Olivia

2012-01-01T23:59:59.000Z

177

Implementation of Revision 19 of the TRUPACT-II Safety Analysis Report at Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission on July 27, 2001 approved Revision 19 of the TRUPACT-II Safety Analysis Report (SAR) and the associated TRUPACT-II Authorized Methods for Payload Control (TRAMPAC). Key initiatives in Revision 19 included matrix depletion, unlimited mixing of shipping categories, a flammability assessment methodology, and an alternative methodology for the determination of flammable gas generation rates. All U.S. Department of Energy (DOE) sites shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) were required to implement Revision 19 methodology into their characterization and waste transportation programs by May 20, 2002. An implementation process was demonstrated by the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The three-part process used by RFETS included revision of the site-specific TRAMPAC, an evaluation of the contact-handled TRU waste inventory against the regulations in Revision 19, and design and development of software to facilitate future inventory analyses.

D'Amico, E.; O'Leary, J.; Bell, S.; Djordjevic, S.; Givens, C,; Shokes, T.; Thompson, S.; Stahl, S.

2003-02-25T23:59:59.000Z

178

Mathieu functions computational toolbox implemented in Matlab  

E-Print Network [OSTI]

The Mathieu functions are used to solve analytically some problems in elliptical cylinder coordinates. A computational toolbox was implemented in Matlab. Since the notation and normalization for Mathieu functions vary in the literature, we have included sufficient material to make this presentation self contained. Thus, all formulas required to get the Mathieu functions are given explicitly. Following the outlines in this presentation, the Mathieu functions could be readily implemented in other computer programs and used in different domains. Tables of numerical values are provided.

E. Cojocaru

2008-11-12T23:59:59.000Z

179

Plans, Implementation, and Results Glossary  

Office of Energy Efficiency and Renewable Energy (EERE)

Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

180

Re: DOE Request for Information - Implementing the National Broadband  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Request for Information - Implementing the National DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the Request for Information ("RFI") by the Department of Energy ("Department" or "DOE") regarding the current and future communications requirements of utilities, including, but not limited to, the requirements of the Smart Grid in an effort to implement certain recommendations of the National Broadband Plan.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Secrets to a Successful Commercial Software (COTS) Implementation  

Science Journals Connector (OSTI)

In todays world, most global companies face enormous challenges in dealing with an inflexible budget climate when complex changes are required. Secrets to a Successful Commercial Software Implementation will help guide business leaders to gain understanding ...

Nick Berg

2008-02-01T23:59:59.000Z

182

Summary Description Federal Acquisition Circular 2005-58 Federal Acquisition Regulation Amendments  

Broader source: Energy.gov (indexed) [DOE]

Description Description Federal Acquisition Circular 2005-58 Federal Acquisition Regulation Amendments Published in the Federal Register April 18, 2012 Page 23364 ----------------------------------------------------------------------- I. Biobased Procurements FAR Case 2010-004 II. Representation Regarding Export of Sensitive Technology to Iran FAR Case 2010-018 III. Justification and Approval of Sole-Source 8(a) Contracts FAR Case 2009-038 IV. Technical Amendments ----------------------------------------------------------------------------- Item I--Biobased Procurements (FAR Case 2010-004) This final rule amends the FAR to implement changes that require contractors to report the biobased products purchased under service and construction contracts. The Farm Security and Rural Investment Act (7 U.S.C.

183

Kentucky State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kentucky Kentucky State Regulations: Kentucky State of Kentucky The Division of Oil and Gas (DOG) in the Department of Natural Resources (DNR) fosters conservation of all mineral resources, encourages exploration of such resources, protects the correlative rights of land and mineral owners, prohibits waste and unnecessary surface loss and damage, and encourages the maximum recovery of oil and gas from all deposits. The Energy and Environment Cabinet brings together various Kentucky agencies. It is tasked with protecting and enhancing Kentucky's natural resources. The Department for Environmental Protection (DEP) administers the major environmental protection laws. The U.S. Environmental Protection Agency (EPA) Region 4 administers Class II underground injection control (UIC) programs in Kentucky in direct implementation.

184

Annual Energy Outlook with Projections to 2025- Legislation and Regulations  

Gasoline and Diesel Fuel Update (EIA)

Corporate Average Fuel Economy Standards for Light Trucks Corporate Average Fuel Economy Standards for Light Trucks Legislation and Regulations. Corporate Average Fuel Economy Standards for Light Trucks The regulation of fuel economy for new light vehicles was established through the enactment of the Energy Policy Conservation Act of 1975. The regulation of light truck fuel economy was implemented in model year 1979. Increases in light truck CAFE standards continued to be made through the 1980s and 1990s, reaching 20.7 miles per gallon for model year 1996. Thereafter, Congress prohibited any further increases in fuel economy standards. Congress lifted the prohibition on new CAFE standards on December 18, 2001. On April 1, 2003, NHTSA published a final rule for increasing CAFE standards for light trucks (all pickup trucks, vans, and sport utility vehicles with gross vehicle weight rating less than 8,500 pounds). The new CAFE standard requires that the light trucks sold by a manufacturer have a minimum average fuel economy of 21.0 miles per gallon for model year 2005, 21.6 miles per gallon for model year 2006, and 22.2 miles per gallon for model year 2007. The new light truck CAFE standards are incorporated

185

Selected Guidance & Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Selected Guidance & Requirements Selected Guidance & Requirements Selected Guidance & Requirements This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in reverse chronological order. More extensive collections of documents are available on the individual pages for Guidance and Requirements pages. Requirements - Statutes National Environmental Policy Act of 1969 Environmental Quality Improvement Act of 1970 Clean Air Act, Section 309 Guidance - Council on Environmental Quality NEPA at 19: A Primer on an "Old" Law with Solutions to New Problems 40 Most Asked Questions Concerning CEQ's NEPA Regulations Guidance - Department of Energy DOE, NEPA, and You

186

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RFI 2010-11129 NBP RFI: Communications Requirements Titled RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" Grid Net, Inc. Comments on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy"

187

Blackout Final Implementation Report  

Broader source: Energy.gov (indexed) [DOE]

Report Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors are listed in Annex 1. The staff wish to acknowledge the contributions of the U.S. Federal Energy Regulatory Commission and the Ontario Ministry of Energy. The staff also wish to acknowl- edge the support and cooperation of the North American Electric Reliability Council and, in particular, of Mr. David Nevius, Senior Vice President and Direc- tor of Reliability Assessment & Performance

188

Implementation of Sustainability at  

E-Print Network [OSTI]

0 Assessing Implementation of Sustainability at UiO Grønt UiO S u s t a i n a b i l i t y i n R e sustainability commitment among universities and proposed Best Green University Practices in 2010. It presents the current status of UiO Environmental Sustainability. #12;1 If you cannot measure it, you cannot manage it

Johansen, Tom Henning

189

Implementation Guidance, Drug Testing - December 3, 2007 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 December 3, 2007 Implementation guidance for applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) selected for Testing Designated Positions (TDP) As established in his memorandum dated September 14, 2007, the Secretary has determined that applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) will be in Testing Designated Positions (TDP) as specified in DOE Order 3792.3, Drug-Free Federal Workplace Testing Implementation Program, for Federal employees, and Title 10, Code of Federal Regulations, Part 707, Workplace Substance Abuse Programs at DOE Sites, for contractor employees. Accordingly,

190

Memorandum, Adjudicative Guidelines Implementation - February 21, 2006 |  

Broader source: Energy.gov (indexed) [DOE]

Adjudicative Guidelines Implementation - February 21, Adjudicative Guidelines Implementation - February 21, 2006 Memorandum, Adjudicative Guidelines Implementation - February 21, 2006 February 21,2006 The following adjudicative guidelines are established for all U.S. government civilian and military personnel, consultants, contractors, employees of contractors, licensees, certificate holders or grantees and their employees and other individuals who require access to classified information. "On December 29,2005, the President approved a revision of the Adjudicative Guidelines for Determining Eligibility for Access to Classified Information. The revised guidelines were distributed as an attachment to a memorandum f?om Stephen J. Hadley, Assistant to the President for National Security Affairs, addressed to William Leonard, Director of the Information Security

191

Conduct of Operations Requirements for DOE Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

"To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

1990-07-09T23:59:59.000Z

192

Drug-Free Federal Workplace Testing Implementation Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides guidance and policy for the administration, application and implementation of the DOE Drug-free Federal Workplace Plan and other regulations that facilitate the maintenance of a drug-free Federal workplace through the establishment of programs to test for the use of illegal drugs. Chg 1, dated 8-21-92

1988-07-29T23:59:59.000Z

193

Statutory Requirements | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Map Printable Version Development Adoption Compliance Regulations Resource Center Statutory Requirements DOE activities surrounding building energy codes are defined by the following statutory requirements. Specific language outlining federal requirements and associated regulations are outlined below. References are also provided to individual statutes. State Building Energy Efficiency Codes Statutory Authority: Energy Conservation and Production Act (ECPA) (Pub. L. No. 94-385), as amended1 Section 304(a) of ECPA, as amended, provides that when the 1992 Model Energy Code (MEC), or any successor to that code2, is revised, the Secretary must determine, not later than 12 months after the revision, whether the revised code would improve energy efficiency in residential

194

Natural Gas Regulations (Kentucky) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas Regulations (Kentucky) Natural Gas Regulations (Kentucky) Natural Gas Regulations (Kentucky) < Back Eligibility Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Utility Program Info State Kentucky Program Type Environmental Regulations Siting and Permitting Provider Department For Natural Resources Kentucky Administrative Regulation title 805 promulgates the rules and regulations pertaining to natural gas production in Kentucky. In addition to KAR title 405, chapter 30, which pertains to any oil shale operation, these regulations govern natural gas operations throughout the state. The following information is found in KAR title 404 chapter 30: Oil shale operations or related activity require a valid permit covering

195

Proper time regulator and renormalization group flow  

Science Journals Connector (OSTI)

We consider some applications of the renormalization group flow equations obtained by resorting to a specific class of proper time regulators. Within this class a particular limit that corresponds to a sharpening of the effective width of the regulator is investigated and a procedure to analytically implement this limit on the flow equations is shown. We focus on the critical exponents determination for the O(N) symmetric scalar theory in three dimensions. The large N limit and some perturbative features in four dimensions are also analyzed. In all problems examined the results are optimized when the mentioned limit of the proper time regulator is taken.

M. Mazza and D. Zappal

2001-10-22T23:59:59.000Z

196

Proper time regulator and Renormalization Group flow  

E-Print Network [OSTI]

We consider some applications of the Renormalization Group flow equations obtained by resorting to a specific class of proper time regulators. Within this class a particular limit that corresponds to a sharpening of the effective width of the regulator is investigated and a procedure to analytically implement this limit on the flow equations is shown. We focus on the critical exponents determination for the O(N) symmetric scalar theory in three dimensions. The large N limit and some perturbative features in four dimensions are also analysed. In all problems examined the results are optimized when the mentioned limit of the proper time regulator is taken.

M. Mazza; D. Zappala'

2001-06-25T23:59:59.000Z

197

Implementing Shor's algorithm on Josephson charge qubits  

SciTech Connect (OSTI)

We investigate the physical implementation of Shor's factorization algorithm on a Josephson charge qubit register. While we pursue a universal method to factor a composite integer of any size, the scheme is demonstrated for the number 21. We consider both the physical and algorithmic requirements for an optimal implementation when only a small number of qubits are available. These aspects of quantum computation are usually the topics of separate research communities; we present a unifying discussion of both of these fundamental features bridging Shor's algorithm to its physical realization using Josephson junction qubits. In order to meet the stringent requirements set by a short decoherence time, we accelerate the algorithm by decomposing the quantum circuit into tailored two- and three-qubit gates and we find their physical realizations through numerical optimization.

Vartiainen, Juha J.; Salomaa, Martti M. [Materials Physics Laboratory, POB 2200 (Technical Physics), Helsinki University of Technology, FIN-02015 HUT (Finland); Niskanen, Antti O. [VTT Information Technology, Microsensing, POB 1207, 02044 VTT (Finland); Nakahara, Mikio [Materials Physics Laboratory, POB 2200 (Technical Physics), Helsinki University of Technology, FIN-02015 HUT (Finland); Department of Physics, Kinki University, Higashi-Osaka 577-8502 (Japan)

2004-07-01T23:59:59.000Z

198

Energy storage for frequency regulation on the electric grid .  

E-Print Network [OSTI]

??Ancillary services such as frequency regulation are required for reliable operation of the electric grid. Currently, the same traditional thermal generators that supply bulk power (more)

Leitermann, Olivia

2012-01-01T23:59:59.000Z

199

Property:Regulations | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Property Name Regulations Property Type String Description Regulations as listed on cleanenergysolutions.org Agriculture Efficiency Requirements Appliance & Equipment Standards and Required Labeling Audit Requirements Building Certification Building Codes Cost Recovery/Allocation Emissions Mitigation Scheme Emissions Standards Enabling Legislation Energy Standards Feebates Feed-in Tariffs Fuel Efficiency Standards Incandescent Phase-Out Mandates/Targets Net Metering & Interconnection Resource Integration Planning Safety Standards Upgrade Requirements Utility/Electricity Service Costs Subproperties This property has the following 43 subproperties: 2 2010 Vehicle Technologies Market Report A A Strategy for Carbon Capture and Storage (CCS) in the United Kingdom and Beyond

200

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... is chosen with limited regard to the short or long-tenn cost. This paper discusses how to develop a plan appropriate to the needs of a particular facility. Introduction In most cases, the opportunity to install a more efficient motor isO available...

Elliott, R. N.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

202

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

203

Design and Implementation of an International Training Program on Repository Development and Management  

SciTech Connect (OSTI)

Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This paper discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)

Vugrin, K.W. [Sandia National Laboratories Carlsbad Programs Group, Performance Assessment and Decision Analysis Department, Carlsbad, NM (United States); Twitchell, Ch.A. [Sandia National Laboratories, Carlsbad Programs Group, Center Business Operations Department, Carlsbad, NM (United States)

2008-07-01T23:59:59.000Z

204

Four-loop plaquette in 3d with a mass regulator  

E-Print Network [OSTI]

The QCD free energy can be studied by dimensional reduction to a three-dimensional (3d) effective theory, whereby non-perturbative lattice simulations become less demanding. To connect to the original QCD a perturbative matching computation is required, which is conventionally carried out in dimensional regularization. Therefore the 3d lattice results need to be converted to this regularization scheme as well. The conversion must be carried up to 4-loop order, where the free energy displays an infrared (IR) singularity. We therefore need a regulator which can be implemented both on the lattice and in the continuum computation. We introduce a mass regulator to perform Numerical Stochastic Perturbation Theory computations. Covariant gauge is fixed in the Faddeev-Popov scheme without introducing any ghost fields.

C. Torrero; F. Di Renzo; V. Miccio; M. Laine; Y. Schroder

2005-09-27T23:59:59.000Z

205

Simulation and Implementation of Space Vector PWM Using Look-Up Table  

Science Journals Connector (OSTI)

With the recent advancements in digital electronics, it became possible to implement the space vector pulse width modulation (SVPMW) technique. Inherently this technique requires ample mathematical computation...

Mahmoud Kassas; Naseer Ahmed

2014-06-01T23:59:59.000Z

206

Re: NBP RFI-Implementing the National Broadband Plan by Studying...  

Broader source: Energy.gov (indexed) [DOE]

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the...

207

LIBRARY REGULATIONS 1. THE LIBRARY POLICY COMMITTEE  

E-Print Network [OSTI]

1 LIBRARY REGULATIONS 1. THE LIBRARY POLICY COMMITTEE 1.1 The Library Policy Committee shall shall be: [i] to formulate proposals in regard to policy matters relating to the Library for consideration by the Academic Council and the Governing Body; [ii] to monitor the implementation of Library

Schellekens, Michel P.

208

Implementation Proposal for The National Action Plan on Demand Response |  

Broader source: Energy.gov (indexed) [DOE]

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

209

a 115-line MATLAB implementation  

E-Print Network [OSTI]

Apr 15, 2013 ... Alternating active-phase algorithm for multimaterial topology optimization problems -- a 115-line MATLAB implementation. Rouhollah Tavakoli...

Rouhollah Tavakoli

2013-04-15T23:59:59.000Z

210

SERN Policy and Regulation Database | Open Energy Information  

Open Energy Info (EERE)

SERN Policy and Regulation Database SERN Policy and Regulation Database Jump to: navigation, search Tool Summary Name: SERN Policy and Regulation Database Agency/Company /Organization: Renewable Energy and Energy Efficiency Partnership Sector: Energy Focus Area: Energy Efficiency, Renewable Energy Topics: Policies/deployment programs, Background analysis Resource Type: Dataset References: REEEP SERN Policy and Regulation Database[1] "The SERN Policy database will allow project developers to understand the existing energy mix within a country and the regulatory barriers which they may have to overcome in implementing a renewable energy and/or energy efficiency project. The policy database is available online." References ↑ "REEEP SERN Policy and Regulation Database"

211

Implementing the National Broadband  

Broader source: Energy.gov (indexed) [DOE]

DAKOTA ELECTRIC ASSOCIATION DAKOTA ELECTRIC ASSOCIATION I. Introduction a. Identification/description of our company Dakota Electric Association (DEA) is an Incorporated Cooperative Association which distributes electricity to more than 100,000 members in Dakota County and surrounding areas. DEA is the second largest electric cooperative in the state of Minnesota, and is a member cooperative of Great River Energy (GRE). II. Executive Summary DEA has deployed a fully integrated IP network to 26 substation sites. An IP based network transports data information for Supervisory Control and Data Acquisition (SCADA) and Load Management systems. A private Wide Area Network (WAN) was implemented by DEA in 2001 due to lack of comprehensive coverage by major carriers. In addition to the WAN, DEA relies on commercial services to communicate with load

212

Requirements | Department of Energy  

Office of Environmental Management (EM)

1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air Act, Section 309 CEQ Regulations 40 CFR Part 1500-1508: CEQ - Regulations for...

213

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

214

EG and G Idaho Environmental Protection Implementation Plan (1990)  

SciTech Connect (OSTI)

This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

Wickham, L.E.

1990-11-01T23:59:59.000Z

215

EG and G Idaho Environmental Protection Implementation Plan (1991)  

SciTech Connect (OSTI)

This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

Graham, J.F.

1991-11-01T23:59:59.000Z

216

Environmental Disclosure Requirements by State … August 2002  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Disclosure Requirements by State - August 2002 Environmental Disclosure Requirements by State - August 2002 State Disclosure Requirement Scope Frequency Distribution Effective Date Authority Legislation/ Regulation Verification Requirement Notes Full Disclosure Requirements Arkansas Standards to be set for disclosure of environmental impacts Electric service providers TBD TBD TBD Legislature 1999 Act 1556; Rules not yet developed TBD Restructuring delayed until 2003. California Fuel mix required in standard format. Electric service providers Quarterly Bill insert, offers, and written promotional materials (except ads) 1999 Legislature Title 20, Article 5, California Code of Regulation Report to Commission annually with supporting documentation. Suppliers not making specific claims may disclose system mix. Colorado Fuel mix. Standard format is suggested.

217

Safety Basis Requirements for Nonnuclear Facilities at Lawrence Livermore National Laboratory Site-Specific Work Smart Standards Revision 1  

SciTech Connect (OSTI)

This standard establishes requirements that, when coupled with Lawrence Livermore National Laboratory's (LLNL's) Integrated Safety Management System (ISMS) methods and other Work Smart Standards for assuring worker safety, assure that the impacts of nonnuclear operations authorized in LLNL facilities are well understood and controlled in a manner that protects the health of workers, the public, and the environment. All LLNL facilities shall be classified based on potential for adverse impact of operations to the health of co-located (i.e., nearby) workers and the public in accordance with this standard, Title 10 Code of Federal Regulations (10 CFR) 830, Subpart B, and Department of Energy Order (DOE O) 420.2A. This standard provides information on: Objectives; Applicability; Safety analysis requirements; Control selection and maintenance; Documentation requirements; Safety basis review, approval, and renewal; and Safety basis implementation.

Beach, R; Brereton, S; Failor, R; Hildum, S; Spagnolo, S; Van Warmerdam, C

2003-02-24T23:59:59.000Z

218

Developments in Assisting Countries in Implementing the IAEA Additional Protocol  

SciTech Connect (OSTI)

In 2008, the U.S. Department of Energy (DOE) began assisting selected non-nuclear weapon states in planning and preparing for implementation of the International Atomic Energy Agencys Additional Protocol (AP). Since then, the AP international implementation program has contributed to the substantial progress made by Vietnam, Thailand, Iraq, and Malaysia in preparing for entry-into-force of the AP. An overall engagement plan has been developed with components designed to train government AP implementing agencies, inform policy makers, conduct outreach to industry and universities, make AP reporting software available and useful, and plan a detailed approach for implementing the declaration and complementary access provisions of the AP. DOE recently began collaborating with Indonesia, which has already entered the AP into force, requiring a second method of engagement somewhat different from that taken with countries that have not entered the AP into force. The AP international implementation program, administered by the International Nuclear Safeguards and Engagement Program, is working more closely with DOEs International Nonproliferation Export Control Program to ensure countries are aware of and prepared to implement the export/import provisions of the AP. As the AP implementation program matures and helps move countries closer to entry-into-force or improved AP implementation, it is identifying characteristics of a countrys end-state that indicate that DOE assistance is no longer required. The U.S. AP Implementation Act and Senate Resolution of Ratification require the Administration to report annually to Congress on measures taken to achieve the adoption of the AP in non-nuclear weapon states. DOEs AP international implementation program is a significant part of these measures. This paper describes recent developments to increase the scope and effectiveness of the program.

Killinger, Mark H.; Hansen, Linda H.; Cain, Ronald A.; Kovacic, Don N.; Apt, Kenneth E.; VanSickle, Matthew

2010-08-11T23:59:59.000Z

219

Regulations For Electric Companies (Tennessee) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regulations For Electric Companies (Tennessee) Regulations For Electric Companies (Tennessee) Regulations For Electric Companies (Tennessee) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative State/Provincial Govt Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Tennessee Program Type Generating Facility Rate-Making Net Metering Provider Tennessee Regulatory Authority The Regulations for Electric Companies are under the Authority of the Tennessee Regulatory Authority, which is the public service branch of the state government. These regulations establish the records electricity providers are required to keep and submit. It requires that all electricity

220

Alternative Fuels Data Center: Idle Reduction Requirement  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Idle Reduction Idle Reduction Requirement to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Requirement on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Requirement on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Google Bookmark Alternative Fuels Data Center: Idle Reduction Requirement on Delicious Rank Alternative Fuels Data Center: Idle Reduction Requirement on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Idle Reduction Requirement A motor vehicle may not idle for more than five consecutive minutes. This regulation does not apply to: 1) vehicles being serviced, provided that

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Alternative Fuels Data Center: Tire Inflation Requirement  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Tire Inflation Tire Inflation Requirement to someone by E-mail Share Alternative Fuels Data Center: Tire Inflation Requirement on Facebook Tweet about Alternative Fuels Data Center: Tire Inflation Requirement on Twitter Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Google Bookmark Alternative Fuels Data Center: Tire Inflation Requirement on Delicious Rank Alternative Fuels Data Center: Tire Inflation Requirement on Digg Find More places to share Alternative Fuels Data Center: Tire Inflation Requirement on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Tire Inflation Requirement The California Air Resources Board (ARB) enforces regulations to reduce greenhouse gas emissions from vehicles operating inefficiently with under

222

Surveillance Guide - OPS 9.14 Required Reading  

Broader source: Energy.gov (indexed) [DOE]

REQUIRED READING REQUIRED READING 1.0 Objective The objective of this surveillance is to evaluate the facility required reading program and current status of required reading. This surveillance provides a basis for evaluating the effectiveness of the contractor's program for required reading and for establishing compliance with DOE requirements. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 2.2 DOE-STD-1033-92, Guide to Good Practices for Operations and Administration Updates Through Required Reading 3.0 Requirements Implemented This surveillance is conducted to implement requirements of the Functions, Responsibilities, and Authorities Manual, Section 20, Operations, FRAM 4253, 4258, and 4261. These requirements are drawn

223

EPICS Version 4 - Implementing Complex Data Types  

SciTech Connect (OSTI)

Through phase 1 and phase 2 SBIR grants, s fully functional I/O Controller and communication protocol for version 4 of EPICS is completed. This new software architecture provides a flexible and extendible architecture. Version 4 is implemented fully in Java. The performance metrics look promising. The final portion of phase 2 is to optimize the communication mechanisms. Subsequent work on different aspects of this are required to provide a viable solutions in various areas. Version 3 of EPICS is able to provide a platform for implementing channel based control, because the channel and attributes for time stamping, alarm, display and control were narrow, well defined, and complete. To extend EPICS functionality beyond this, it is necessary to define attributes needed for archive data, array, image data, and directory services. The proper handling of several array types enables the development of middle layer servers such as orbit and bump control in accelerators. Phase 1 should produce a well defined, reviewed, and agreed upon definition of the metadata required for these services. A Phase 2 grant would provide tools that implemented archiving, general array, imaging, and directory applications.

Marty Kraimer,; John dalesio

2012-11-27T23:59:59.000Z

224

Implementation of a Radiological Safety Coach program  

SciTech Connect (OSTI)

The Safe Sites of Colorado Radiological Safety program has implemented a Safety Coach position, responsible for mentoring workers and line management by providing effective on-the-job radiological skills training and explanation of the rational for radiological safety requirements. This position is significantly different from a traditional classroom instructor or a facility health physicist, and provides workers with a level of radiological safety guidance not routinely provided by typical training programs. Implementation of this position presents a challenge in providing effective instruction, requiring rapport with the radiological worker not typically developed in the routine radiological training environment. The value of this unique training is discussed in perspective with cost-savings through better radiological control. Measures of success were developed to quantify program performance and providing a realistic picture of the benefits of providing one-on-one or small group training. This paper provides a description of the unique features of the program, measures of success for the program, a formula for implementing this program at other facilities, and a strong argument for the success (or failure) of the program in a time of increased radiological safety emphasis and reduced radiological safety budgets.

Konzen, K.K. [Safe Sites of Colorado, Golden, CO (United States). Rocky Flats Environmental Technology Site; Langsted, J.M. [M.H. Chew and Associates, Golden, CO (United States)

1998-02-01T23:59:59.000Z

225

Equipment Operational Requirements  

SciTech Connect (OSTI)

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

226

EPA speeds technology implementation  

SciTech Connect (OSTI)

Common barriers block the use of innovative remediation technologies. The Innovative Treatment Remediation Demonstration (ITRD) Program at the US Department of Energy`s (DOE`s) Sandia National Laboratories was initiated in 1993 in cooperation with the US Environmental Protection Agency`s (EPA`s) Technology Innovation Office in an attempt to reduce these barriers and accelerate the implementation of innovative remediation technologies. The innovative technologies considered for evaluation by the ITRD program lack the cost and performance information that would otherwise permit their full consideration as remedial alternatives. These technologies have often shown promise in pilot-scale applications but have limited full-scale data. Some examples in this category include: bioremediation, in situ dynamic stripping, soil washing and soil flushing, solvent and surfactant extraction and chemical treatment, in situ passive treatment, and advanced physical separation techniques. Currently, three ITRD projects are under way. ITRD sites are generally small, and most are characterized sites already scheduled for remediation. Thus, each project can be initiated quickly; additional program costs are minimized; and overall site remediation is accelerated. ITRD projects tend to target sites with typical soil and groundwater contamination problems. Contaminants at such sites include chlorinated solvents and petroleum products; pesticides, polychlorinated biphenyls (PCBs), and dioxins; heavy metals; explosives; and complex or multiconstituent contamination. The paper describes the activities at these three projects located at Pinellas, Mound Laboratory, and Fernald.

Hightower, M.M. [Sandia National Labs., Albuquerque, NM (United States). Environmental Programs Center

1996-04-01T23:59:59.000Z

227

TRUPACT-1 implementation plan  

SciTech Connect (OSTI)

TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

1985-09-01T23:59:59.000Z

228

Implementing the National Broadband Plan by Studying the Communications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Studying the Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy The Department of Energy (DOE) is seeking comments and information from interested parties to assist DOE in understanding the communications requirements of utilities, including, but not limited to, the requirements of the Smart Grid. This RFI also seeks to collect information about electricity infrastructure's current and projected communications requirements, as well as the types of networks and communications services that may be used for grid modernization. Specifically, DOE seeks information on what types of communications capabilities that the utilities

229

Preparing for Project Implementation: Providing Resources for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Project Implementation: Providing Resources for Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

230

Hazardous Waste Management Regulations (Mississippi) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regulations (Mississippi) Regulations (Mississippi) Hazardous Waste Management Regulations (Mississippi) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Mississippi Program Type Environmental Regulations Sales Tax Incentive Provider Department of Environmental Quality The Hazardous Waste Management Regulations follow the EPA's definitions and guidelines for the most part, which are listed in 40 CFR parts 260-282. In addition to these federal regulations the Mississippi Department of Environmental Quality requires that each generator of greater than 220

231

Notice of Guidance on Energy Efficiency Enforcement Regulations |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Guidance on Energy Efficiency Enforcement Regulations Notice of Guidance on Energy Efficiency Enforcement Regulations Notice of Guidance on Energy Efficiency Enforcement Regulations Notice - DOE Guidance on Energy Efficiency Enforcement Regulations, Federal Register Vol. 74, No. 197 October 14, 2009. This notice sets forth the Department of Energy's (DOE's) interpretation of its energy efficiency enforcement regulations. These regulations provide for manufacturer submission of compliance statements and certification reports to DOE, maintenance of compliance records by manufacturers, and the availability of enforcement actions for improper certification or upon a determination of noncompliance. DOE also announces its intent to randomly select and review manufacturer compliance with these requirements and initiate enforcement

232

Self-assessment program implementation plan. Revision A  

SciTech Connect (OSTI)

This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

Quets, A.L.

1991-10-23T23:59:59.000Z

233

High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 5  

SciTech Connect (OSTI)

The Fire Protection functional area for the Hanford Site Tank Farm facilities and support structures is based on the application of relevant DOE orders, regulations, and industry codes and standards. The fire protection program defined in this document may be divided into three areas: (1) organizational, (2) administrative programmatic features, and (3) technical features. The information presented in each section is in the form of program elements and orders, regulations, industry codes, and standards that serve as the attributes of a fire protection program for the Tank Farm facilities. Upon completion this document will be utilized as the basis to evaluate compliance of the fire protection program being implemented for the Tank Farm facilities with the requirements of DOE orders and industry codes and standards.

Not Available

1994-04-01T23:59:59.000Z

234

Equipment Certification Requirements | Open Energy Information  

Open Energy Info (EERE)

Equipment Certification Requirements Equipment Certification Requirements Jump to: navigation, search Policies requiring renewable energy equipment to meet certain standards serve to protect consumers from buying inferior equipment. These requirements not only benefit consumers; they also protect the renewable energy industry by making it more difficult for substandard systems to reach the market. [1] Contents 1 Equipment Certification Incentives 2 References Equipment Certification Incentives CSV (rows 1 - 19) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Canada Oil and Gas Operations Act (Canada) Environmental Regulations Equipment Certification Fees Generating Facility Rate-Making Generation Disclosure Industry Recruitment/Support Safety and Operational Guidelines

235

Savannah River Site Environmental Implementation Plan  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

236

Conduct of operations implementation plan  

SciTech Connect (OSTI)

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

237

Radiation dose assessment methodology and preliminary dose estimates to support US Department of Energy radiation control criteria for regulated treatment and disposal of hazardous wastes and materials  

SciTech Connect (OSTI)

This report provides unit dose to concentration levels that may be used to develop control criteria for radionuclide activity in hazardous waste; if implemented, these criteria would be developed to provide an adequate level of public and worker health protection, for wastes regulated under U.S, Environmental Protection Agency (EPA) requirements (as derived from the Resource Conservation and Recovery Act [RCRA] and/or the Toxic Substances Control Act [TSCA]). Thus, DOE and the US Nuclear Regulatory Commission can fulfill their obligation to protect the public from radiation by ensuring that such wastes are appropriately managed, while simultaneously reducing the current level of dual regulation. In terms of health protection, dual regulation of very small quantities of radionuclides provides no benefit.

Aaberg, R.L.; Baker, D.A.; Rhoads, K.; Jarvis, M.F.; Kennedy, W.E. Jr.

1995-07-01T23:59:59.000Z

238

Implementation of 10 CFR 20.1406, Regarding Minimizing Contamination and the Generation of Waste, and Facilitating Decommissioning through the Design of Facilities and Operating Procedures  

SciTech Connect (OSTI)

In the very near future (perhaps as soon as the fall of 2007), the U.S. Nuclear Regulatory Commission (NRC) anticipates receiving one or more license applications for new nuclear power plants. An important consideration for new facilities is that they be designed and operated to minimize contamination, to minimize the generation of waste, and to facilitate decommissioning. A relatively recent regulation, 10 CFR 20.1406, mandates these requirements. The regulation states, 'Applicants for licenses, other than renewals, after August 20, 1997, shall describe in the application how facility design and procedures for operation will minimize, to the extent practicable, contamination of the facility and the environment, facilitate eventual decommissioning, and minimize, to the extent practicable, the generation of radioactive waste'. This paper summarizes various initiatives taken by the NRC and industry to develop guidance for implementing 10 CFR 20.1406 before submission of license applications. (authors)

O'Donnell, E.; Ott, W.R. [Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC (United States)

2007-07-01T23:59:59.000Z

239

NEPA Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Implementation Implementation NEPA Implementation Selected documents providing guidance on the implementation of NEPA. September 7, 2012 OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution This Office of Management and Budget (OMB) and Council on Environmental Quality (CEQ) joint memorandum expands and builds on the November 28, 2005, Environmental Conflict Resolution (ECR) Memorandum, directing departments and agencies to increase the appropriate and effective use of third-party assisted environmental collaboration as well as environmental conflict resolution to resolve problems and conflicts that arise in the context of environmental, public lands, or natural resources issues, including matters related to energy, transportation, and water and land management.

240

Financing Program Implementation Process Flow  

Broader source: Energy.gov [DOE]

The implementation process flow for financing with two models: a generic option for primary markets and a conceptual option for secondary markets.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Feed tank transfer requirements  

SciTech Connect (OSTI)

This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

Freeman-Pollard, J.R.

1998-09-16T23:59:59.000Z

242

Operations and Maintenance Program Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Implementation Program Implementation Operations and Maintenance Program Implementation October 4, 2013 - 5:16pm Addthis Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies. While no universal plan exists, Federal Energy Management Program (FEMP) recommends the following common steps for implementing O&M programs: Start small: Choose a project that is manageable and can be completed in a short period of time (e.g., six months to one year) Select troubled equipment: Choose a project with visibility because of problematic equipment history Minimize risk: Choose a project that provides immediate and positive results; this project must be successful, so risk of failure should be

243

Discovery of a Splicing Regulator Required for Cell Cycle Progression...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

conserved across modern eukaryotic kingdoms. Citation: Suvorova ES, M Croken, S Kratzer, LM Ting, M Conde de Felipe, B Balu, LM Markillie, LM Weiss, K Kim, and MW...

244

Discovery of a Splicing Regulator Required for Cell Cycle Progression  

E-Print Network [OSTI]

, University of Las Palmas de Gran Canaria, Arucas, Las Palmas de Gran Canaria, Spain, 5 Tropical Disease

Arnold, Jonathan

245

Trials and tribulations implementing the Clean Air Act Title V in fourteen air districts  

SciTech Connect (OSTI)

Santa Fe pacific Pipeline Partners, L.P. (SFPP) is a refined petroleum pipeline operating in six states in the western United States. Sixteen terminals are subject to the Title V permit to operate requirements. There are many obstacles to overcome, not only when preparing applications for Title V operating permits, but in the implementation phase of the project as well. Each Air District has its own set of rules and regulations that must be adhered to in preparing the application. For example, some districts required the insignificant sources to be documented and included in compliance plans and some do not. The format required for the application varies from stringent forms that must be completed to no forms at all. In preparing the Title V application for SFPP, the author quickly realized if this confusion was transferred to the implementation phase, compliance would be a failure. Therefore, early on the environmental manager instituted a training program. Beginning with a pilot program in one district the author began training managers and supervisors. This program quickly was expanded to include senior vice presidents and technicians. This training session was a one hour of general overview to visually describe how the Title V process would affect the facilities. As a result of this training, virtually every employee became familiar with how the Title V program was affecting the facilities. Engineering and Customer Service is instructed to notify the manager of any and every new project so it could undergo a review to determine if it affected a Title V facility. The field acts as a check of the system. Any change or modification at any facility is immediately under scrutiny for Title V implications. Another obstacle to overcome is to help the facility deal with something that is new and basically a different way of operating.

Moore, C. [Environmental Affairs Santa Fe Pacific Pipeline Partners, Orange, CA (United States)

1998-12-31T23:59:59.000Z

246

Federal Requirements for Sustainable Buildings by Topic | Department of  

Broader source: Energy.gov (indexed) [DOE]

Topic Topic Federal Requirements for Sustainable Buildings by Topic October 4, 2013 - 4:46pm Addthis For sustainable buildings at Federal agencies, the laws and regulations required for compliance fall under the following topics. Also see Federal Requirements for Sustainable Buildings by Law and Regulation and Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings. Greenhouse Gas (GHG) Reduction GHG reduction requirements for sustainable buildings include: Decreasing agency use of chemicals where such decrease will assist the agency in achieving GHG reduction targets Reducing water and energy use intensity. Also see information on GHG Mitigation Planning for Buildings. Water Use Intensity Water use intensity requirements for sustainable buildings include:

247

Requirements and Submission Process for Qualified Software  

Broader source: Energy.gov (indexed) [DOE]

Requirements and Submission Process for Qualified Software The U.S. Department of Energy (DOE) verifies and maintains the list of software that qualifies for the calculation of the energy and power cost savings for commercial building tax deductions under tax code Section 179D. The software requirements are listed under Internal Revenue Service (IRS) Code §179D (c)(1) and (d) Regulations, Notice 2006-52

248

Energy Sector Cybersecurity Framework Implementation Guidance  

Energy Savers [EERE]

DRAFT FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of...

249

Providing Resources for Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resources for Implementation (May 12, 2010) More Documents & Publications Creating a Climate for Successful Project Implementation Communicating Accomplishments to All...

250

Implementation Report: Energy Conservation Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Section 141 of the to Section 141 of the Energy Policy Act of 2005 U.S. Department of Energy February 2007 Table of Contents List of Acronyms .............................................................................................................. 3 Introduction ...................................................................................................................... 4 State of New York, et al. v. Bodman; and NRDC, Inc. et al v. Bodman ............................ 5 Multi-Year Schedule and Implementation Update..................................................... 6 Multi-Year Schedule....................................................................................................... 6 Implementation Update .................................................................................................. 9

251

Implementation Report: Energy Conservation Activities  

Broader source: Energy.gov (indexed) [DOE]

to Section 141 of the to Section 141 of the Energy Policy Act of 2005 U.S. Department of Energy February 2007 Table of Contents List of Acronyms .............................................................................................................. 3 Introduction ...................................................................................................................... 4 State of New York, et al. v. Bodman; and NRDC, Inc. et al v. Bodman ............................ 5 Multi-Year Schedule and Implementation Update..................................................... 6 Multi-Year Schedule....................................................................................................... 6 Implementation Update .................................................................................................. 9

252

Biofuel and Bioenergy implementation scenarios  

E-Print Network [OSTI]

and bioenergy markets are modelled with the aim to conduct quantitative analyses on the production and costsBiofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies #12;Biofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies By André

253

Federal strategies to increase the implementation of combined heat and power technologies in the United States  

SciTech Connect (OSTI)

Recent interest in combined heat and power (CHP) is providing momentum to efforts aimed at increasing the capacity of this highly-efficient technology. Factors driving this increase in interest include the need to increase the efficiency of the nation's electricity generation infrastructure, DOE Assistant Secretary Dan Reicher's challenge to double the capacity of CHP by 2010, the success of DOE's Advanced Turbine Systems Program in supporting ultra-efficient CHP technologies, and the necessity of finding cost-effective solutions to address climate change and air quality issues. The federal government is committed to increasing the penetration of CHP technologies in the US. The ultimate goal is to build a competitive market for CHP in which policies and regulations support the implementation of a full suite of technologies for multiple applications. Specific actions underway at the federal level include technology strategies to improve CHP data collection and assessment and work with industry to encourage the development of advanced CHP technologies. Policy strategies include changes to federal environmental permitting procedures including CHP-friendly strategies in federal restructuring legislation, supporting tax credits and changes to depreciation requirements as economic incentives to CHP, working with industry to leverage resources in the development of advanced CHP technologies, educating state officials about the things they can do to encourage CHP, and increasing awareness about the benefits of CHP and the barriers limiting its increased implementation.

Laitner, J.; Parks, W.; Schilling, J.; Scheer, R.

1999-07-01T23:59:59.000Z

254

Federal Energy Management Program: Federal Requirements for Sustainable  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Federal Federal Requirements for Sustainable Buildings to someone by E-mail Share Federal Energy Management Program: Federal Requirements for Sustainable Buildings on Facebook Tweet about Federal Energy Management Program: Federal Requirements for Sustainable Buildings on Twitter Bookmark Federal Energy Management Program: Federal Requirements for Sustainable Buildings on Google Bookmark Federal Energy Management Program: Federal Requirements for Sustainable Buildings on Delicious Rank Federal Energy Management Program: Federal Requirements for Sustainable Buildings on Digg Find More places to share Federal Energy Management Program: Federal Requirements for Sustainable Buildings on AddThis.com... Sustainable Buildings & Campuses Basics Federal Requirements By Regulation

255

Safety in Mine Research EstablishmentPresent-day requirements for protection against fire in coal mines  

E-Print Network [OSTI]

measures against fire are put into practice in accordance with the requirement a of the Safety regulations for coal and shale mines" and other regulating documents. However, scientific research carried out in recent years at the All-Union Scientific...

Kushnarev, A.; Koslyuk, A.; Petrov, P.

256

Resource Adequacy Implications of Forthcoming EPA Air Quality Regulations  

Broader source: Energy.gov (indexed) [DOE]

Executive Summary Executive Summary December 2011 Resource Adequacy Implications of Forthcoming EPA Air Quality Regulations RESOURCE ADEQUACY IMPLICATIONS OF FORTHCOMING EPA AIR QUALITY REGULATIONS - EXECUTIVE SUMMARY Executive Summary This report presents the results of an independent assessment by the U.S. Department of Energy (DOE) of the adequacy of U.S. electric generation resources under air pollution regulations being finalized by the U.S. Environmental Protection Agency (EPA). This report does not estimate the economic impacts of EPA regulations, nor does it provide detailed reliability assessments that planning authorities and other stakeholders will need to conduct to ensure deliverability of power and grid reliability during implementation of EPA rules.

257

Preamble: CEQ NEPA regulations (1986): Incomplete or Unavailable Information  

Broader source: Energy.gov (indexed) [DOE]

618 618 Federal Register / Vol. 51, No. 80 / Friday, April 25, 1986 / Rules a n d Regulations - -- COUNCIL ON ENVIRONMENTAL QUALITY 40 CFR Part 1502 National Environmental Pollcy Act Regulations; Incomplete or Unavailable Information AGENCY: Council on Environmental Quality, Executive Office of the President. ACTION: Final rule. SUMMARY: The Council on Environmental Quality (CEQ) promulgates regulations, binding on all federal agencies, to implement the procedural provisions of the National Environmental Policy Act (NEPA). The regulations address the administration of the NEPA process, including preparation of environmental impact statements for major federal actions which significantly affect the quality of the human environment. On August 9 . 1985, CEQ published a proposed

258

DEPLOYMENT OF INNOVATIVE CHARACTERIZATION TECHNOLOGIES AND IMPLEMENTATION OF THE MARSSIM PROCESS AT RADIOLOGICALLY CONTAMINATED SITES.  

SciTech Connect (OSTI)

The success of this Accelerated Site Technology Deployment (ASTD) project is measured on several levels. First, the deployment of this innovative approach using in situ characterization, portable field laboratory measurements, and implementation of MARSSIM was successfully established for all three phases of D and D characterization, i.e., pre-job scoping, on-going disposition of waste, and final status surveys upon completion of the activity. Unlike traditional D and D projects, since the Brookhaven Graphite Research Reactor Decommissioning Project (BGRR-DP) is operating on an accelerated schedule, much of the work is being carried out simultaneously. Rather than complete a full characterization of the facility before D and D work begins, specific removal actions require characterization as the activity progresses. Thus, the need for rapid and cost-effective techniques for characterization is heightened. Secondly, since the approach used for this ASTD project was not thoroughly proven prior to deployment, a large effort was devoted to demonstrating technical comparability to project managers, regulators and stakeholders. During the initial phases, large numbers of replicate samples were taken and analyzed by conventional baseline techniques to ensure that BGRR-DP quality assurance standards were met. ASTD project staff prepared comparisons of data gathered using ISOCS and BetaScint with traditional laboratory methods and presented this information to BGRR-DP staff and regulators from EPA Region II, NYS Department of Environmental Conservation, and the Suffolk County Board of Health. As the results of comparability evaluations became available, approval for these methods was received and the techniques associated with in situ characterization, portable field laboratory measurements, and implementation of MARSSIM were gradually integrated into BGRR-DP procedures.

KALB,P.D.; MILIAN,L.; LUCKETT,L.; WATTERS,D.; MILLER,K.M.; GOGOLAK,C.

2001-05-01T23:59:59.000Z

259

Quality Assurance Requirements and Description  

Broader source: Energy.gov (indexed) [DOE]

QjCivilianRadioactive QjCivilianRadioactive Was'fe Management QA: QA QVALITY ASSURANCE REQUIREMENTS AND DESCRIPTION DOEIRW-0333P Revisiol1 20 Effective Date: 10-01-2008 LarrY Newman, DlrectQr Office of Quality As,surance ~~--~-_._._- Edward F. Spr at III, Di or Office of Civilian Radioactive Waste Management Date I/Jf/4t' , . - - - Date OCRWM Title: Quality Assurance Requirements and Description DOEIRW-0333P, Revision 20 Office of Civilian Radioactive Waste Management Quality Assurance Policy Page: 2 of 160 Successful implementation of the Office of Civilian Radioactive Waste Management (OCRWM) Quality Assurance (QA) program is essential for the OCRWM to carry out its mission. Our mission is to manage and dispose ofbigh-Ievel radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits

260

Marketing Strategy and Implementation  

SciTech Connect (OSTI)

This report documents the marketing campaign that has been designed for middle and high school students in New Mexico to increase interest in participation in national security careers at the National Nuclear Security Administration. This marketing campaign builds on the research that was previously conducted, as well as the focus groups that were conducted. This work is a part of the National Nuclear Security Preparedness Project (NSPP) being performed under a Department of Energy (DOE) / National Nuclear Security Administration (NNSA) grant. Outcome analysis was performed to determine appropriate marketing strategies. The analysis was based upon focus groups with middle school and high school students, student interactions, and surveys completed by students to understand and gauge student interest in Science, Technology, Engineering, and Math (STEM) subjects, interest in careers at NNSA, future job considerations, and student desire to pursue post-secondary education. Further, through the focus groups, students were asked to attend a presentation on NNSA job opportunities and employee requirements. The feedback received from the students was utilized to develop the focus and components of the marketing campaign.

None

2010-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Implementation of NUREG 1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

This paper discusses the implementation of a quality assurance program that fulfills the requirements of the U.S. Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements for the identification of items and activities important to public radiological safety and waste isolation for placement on a Q-List and Quality Activities List and also for graded application of QA measures. The process and organization for implementing this guidance is discussed.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L. [Science Applications International Corp., Las Vegas, NV (USA)

1990-10-01T23:59:59.000Z

262

Implementation of NUREG-1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

The US Department of Energy`s Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ``Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements`` for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

1990-04-01T23:59:59.000Z

263

Solid Waste Regulation No. 8 - Solid Waste Composting Facilities (Rhode  

Broader source: Energy.gov (indexed) [DOE]

Regulation No. 8 - Solid Waste Composting Facilities Regulation No. 8 - Solid Waste Composting Facilities (Rhode Island) Solid Waste Regulation No. 8 - Solid Waste Composting Facilities (Rhode Island) < Back Eligibility Commercial Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Rhode Island Program Type Environmental Regulations Provider Department of Environmental Management Facilities which compost putrescible waste and/or leaf and yard waste are subject to these regulations. The regulations establish permitting, registration, and operational requirements for composting facilities. Operational requirements for putrescible waste facilities include siting, distance, and buffer requirements, as well as standards for avoiding harm to endangered species and contamination of air and water sources. Specific

264

Equivalence of safety requirements between CANDU and US NRC requirements  

SciTech Connect (OSTI)

The Canada deuterium uranium (CANDU) technology has been built on an original pressurized heavy-water reactor (PHWR) concept, which has several characteristics different from those of light water reactors (LWRs). However, the philosophy of defense-in-depth, based on multiple levels of safety and implemented through the provision of several physical and functional barriers against the release of radioactivity to the environment, is applied to both types of reactor. It is not surprising, therefore, that there is conceptual convergence of safety objectives between the CANDU and the LWR designs, which in turn translates into an equivalence of CANDU safety requirements with the US Nuclear Regulatory Commission (NRC) requirements established for LWRS. The demonstration of this safety requirements equivalence has been an important activity for the licensing of CANDU reactors in countries whose regulatory environment has been influenced by the NRC approach and has more recently acquired a special emphasis in the context of a preapplication review of an advanced CANDU design, the CANDU 3, for its design certification in the United States. This paper highlights results of a comparative exercise dealing with the fundamental principles of the CANDU safety philosophy and the corresponding NRC requirements.

Azeez, S.; Bonechi, M. (Sheridan Park Research Community, Mississauga, Ontario (Canada)); Rib, L. (AECL Technologies, Rockville, MD (United States))

1993-01-01T23:59:59.000Z

265

Surface Coal Mining Regulations (Mississippi) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Surface Coal Mining Regulations (Mississippi) Surface Coal Mining Regulations (Mississippi) Surface Coal Mining Regulations (Mississippi) < Back Eligibility Commercial Construction Developer Industrial Utility Program Info State Mississippi Program Type Environmental Regulations Siting and Permitting Provider Mississippi Department of Environmental Quality The Surface Coal Mining Regulations are a combination of permitting requirements and environmental regulations that limit how, where and when coal can be mined. It protects lands that are under special regulation due to their nature, and applies only to state lands. When applied to Coal with Carbon Capture and Storage projects the rules that would apply to a normal coal-mining project still apply. In addition to these measures, a CCS plant would need to adhere to all waste disposal requirements, water usage

266

Marketing Strategy and Implementation  

SciTech Connect (OSTI)

This report documents the preparation of materials for the marketing campaign that has been designed for middle and high school students in New Mexico to increase interest in participation in national security careers at the National Nuclear Security Administration. The materials and the marketing campaign build on the research that was previously completed, as well as the focus groups that were conducted. This work is a part of the National Nuclear Security Preparedness Project (NSPP). Previous research included outcome analysis to determine appropriate marketing strategies. The analysis was based upon focus groups with middle school and high school students, student interactions, and surveys completed by students to understand and gauge student interest in Science, Technology, Engineering, and Math (STEM) subjects, interest in careers at NNSA, future job considerations, and student desire to pursue post-secondary education. Further, through the focus groups, students were asked to attend a presentation on NNSA job opportunities and employee requirements. The feedback received from the students was utilized to develop the focus and components of a marketing campaign divided into DISCO (Discovering Intelligence and Security Career Opportunities) for the middle school age group and DISCO..Your Way! for high school age groups. Both campaigns have an intertwined message that focuses on the education of students in the various national security career opportunities at NNSA using the STEM concepts and the notion that almost any career they can think of has a fit within NNSA. Further, a special emphasis has been placed on the importance of obtaining a national security clearance when working at NNSA and the steps that will need to be taken during middle school, high school, and college to be allowed this opportunity.

None

2010-09-30T23:59:59.000Z

267

California's new mandatory greenhouse gas reporting regulation  

SciTech Connect (OSTI)

Beginning in early 2009, approximately 1000 California businesses will begin reporting their greenhouse gas (GHG) emissions based on the requirements of a new regulation adopted by the California Air Resources Board (CARB) in December 2007. California's mandatory GHG reporting regulation is the first rule adopted as a requirement of the Global Warming Solutions Act of 2006, passed by the California Legislature as Assembly Bill 32 (AB 32; Nunez, Chapter 488, Statutes of 2006) and signed by Governor Arnold Schwarzenegger in September 2006. The regulation is the first of its kind in the United States to require facilities to report annual GHG emissions. In general, all facilities subject to reporting are required to report their on-site stationary source combustion emissions of CO{sub 2}, nitrous oxide (N{sub 2}O), and methane (CH{sub 4}). Some industrial sectors, such as cement producers and oil refineries, also must report their process emissions, which occur from chemical or other noncombustion activities. Fugitive emissions from facilities are required to be reported when specified in the regulation. Sulfur hexafluoride (SF{sub 6}) and hydrofluorocarbon (HFC) use is prevalent in electricity facilities and must be reported. CO{sub 2} emissions from biomass-derived fuels must be separately identified during reporting, and reporters must also provide their consumption of purchased or acquired electricity and thermal energy; these requirements will assist facilities in evaluating changes in their fossil fuel carbon footprints. 1 tab.

Patrick Gaffney; Doug Thompson; Richard Bode [California Air Resources Board, CA (United States)

2008-11-15T23:59:59.000Z

268

SAR polar format implementation with MATLAB.  

SciTech Connect (OSTI)

Traditional polar format image formation for Synthetic Aperture Radar (SAR) requires a large amount of processing power and memory in order to accomplish in real-time. These requirements can thus eliminate the possible usage of interpreted language environments such as MATLAB. However, with trapezoidal aperture phase history collection and changes to the traditional polar format algorithm, certain optimizations make MATLAB a possible tool for image formation. Thus, this document's purpose is two-fold. The first outlines a change to the existing Polar Format MATLAB implementation utilizing the Chirp Z-Transform that improves performance and memory usage achieving near realtime results for smaller apertures. The second is the addition of two new possible image formation options that perform a more traditional interpolation style image formation. These options allow the continued exploration of possible interpolation methods for image formation and some preliminary results comparing image quality are given.

Martin, Grant D.; Doerry, Armin Walter

2005-11-01T23:59:59.000Z

269

Re: Implementing the National Broadband Plan by Studying the Communications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Studying the Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Alcatel-Lucent ("ALU") appreciates the opportunity to contribute to the Department of Energy's ("Department") Request for Information ("RFI")1 to better understand the communications requirements of utilities, including the requirements of Smart Grid Technology. ALU sees smart grid as one of several solutions offered by the technological advances and widespread deployment of broadband networks. While in its comments ALU addresses the narrow issues raised specifically in the Department's RFI, these comments also convey broader policy

270

NEPA Implementation Procedures: Appendices I, II, and III | Department of  

Broader source: Energy.gov (indexed) [DOE]

NEPA Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III These appendices are intended to improve public participation and facilitate agency compliance with the National Environmental Policy Act (NEPA) and the Council on Environmental Quality's NEPA Regulations, the last version appeared in the Federal Register of Friday, December 21,1984 (49 FR 49754). Note: The specfic contact information is outdated and should not be used for consultation or outreach. Appendix I - Federal and Federal-State Agency NEPA Contacts Appendix II - Federal and Federal- State Agencies With Jurisdiction by Law or Special Expertise on Environmental Quality Issues Appendix III - Federal and Federal-State Agency Offices for

271

Feed tank transfer requirements  

SciTech Connect (OSTI)

This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

Freeman-Pollard, J.R.

1998-09-16T23:59:59.000Z

272

Strategic environmental assessment implementation in China - Five-year review and prospects  

SciTech Connect (OSTI)

Through literature review and questionnaire survey, the purpose of this study is to understand current status and major fields of SEA implementation in China, and then to provide advice for future improvement of SEA system, according to objective evaluation of the effectiveness of SEA implementation. Major types and fields of SEA implementation were firstly studied to conclude that the attitude of decision-makers and competent authority of SEA implementation does generate direct impacts on SEA implementation. Current status of SEA implementation were then studied, in terms of timing, techniques and methodologies, public participation, information disclosure, alternative, and review organization, to conclude that SEA implementation in China is 'impact-based SEA' and the major problems of SEA implementation are resulted from deficient and defective management of SEA system, such as laws, regulations, and means of management. In order to have objective evaluation on the effectiveness of SEA implementation, to understand good practice of SEA implementation, and to provide advice for future improvement of SEA system, it is necessary to establish reasonable and feasible evaluation criteria for the effectiveness of SEA implementation, based upon foreign experience and political, legislative, administrative and cultural characteristics of China. Various types and stages of SEA should be carefully considered to be included into the evaluation criteria for the effectiveness of SEA implementation.

Wu Jing [Centre of Strategic Environmental Assessment for China, Chinese University of Hong Kong, Shatin, N.T. (Hong Kong); Research Center for Strategic Environmental Assessment, Nankai University, Tianjin 300071 (China); Chang, I-Shin, E-mail: heart.chang@yahoo.co [College of Environment and Resources, Inner Mongolia University, Inner Mongolia 010021 (China); Bina, Olivia; Lam, Kin-Che [Centre of Strategic Environmental Assessment for China, Chinese University of Hong Kong, Shatin, N.T. (Hong Kong); Xu He [Research Center for Strategic Environmental Assessment, Nankai University, Tianjin 300071 (China)

2011-01-15T23:59:59.000Z

273

User Requirements Gathered for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshops to derive and document each DOE SC Office's HPC requirements for NERSC in 2013-14" * Deliverables: Reports that includes both the HPC requirements and supporting...

274

BES Science Network Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of...

275

Creating a methodology and tool to capture and resolve conflicts in developing software requirements: Requirement Lifecycle Modeling Views manager (RLMV)  

E-Print Network [OSTI]

for change. Fig. 2. The Revision View in RLMV The purpose of the Use Case View is to describe "the behavior of the system as seen by its end users, analysts, and testers" (Booch, Jacobson, and Rumbaugh, 1999). It does not specify the organization.... . Code Implementation. . User Interface. 4 9 13 13 FUTURE IMPROVEMENTS. 16 CONCLUSION. 17 REFERENCES. APPENDIX A. 19 LIST OF FIGURES FIGURE I Requirement View implemented in RLMV. . . . . PAGE 2 Revision View implemented in RLMV...

Herrera, Leeha Rae-Lyn

2013-02-22T23:59:59.000Z

276

Training implementation matrix, Spent Nuclear Fuel Project (SNFP)  

SciTech Connect (OSTI)

This Training Implementation Matrix (TIM) describes how the Spent Nuclear Fuel Project (SNFP) implements the requirements of DOE Order 5480.20A, Personnel Selection, Qualification, and Training Requirements for Reactor and Non-Reactor Nuclear Facilities. The TIM defines the application of the selection, qualification, and training requirements in DOE Order 5480.20A at the SNFP. The TIM also describes the organization, planning, and administration of the SNFP training and qualification program(s) for which DOE Order 5480.20A applies. Also included is suitable justification for exceptions taken to any requirements contained in DOE Order 5480.20A. The goal of the SNFP training and qualification program is to ensure employees are capable of performing their jobs safely and efficiently.

EATON, G.L.

2000-06-08T23:59:59.000Z

277

Compliance with revised acid rain monitoring requirements for gas and oil fired units: Appendix D and E of Part 75  

SciTech Connect (OSTI)

EPA`s CEM rule (40 CFR Part 75) implements the monitoring provisions of Title IV of the Clean Air Act Amendments of 1990. In most cases Part 75 requires utilities to monitor sulfur dioxide (SO{sub 2}), nitrogen oxide (NO{sub x}) and carbon dioxide emissions (CO{sub 2}), and volumetric flow and opacity using Continuous Emissions Monitoring Systems (CEMS). Appendix D and E of 40 CFR Part 75 provide alternatives to using Continuous Emissions Monitoring Systems (CEMS) to comply with the monitoring requirements of Title IV of the Clean Air Act. EPA is considering a number of changes to Part 75, including significant changes to Appendix D and E. Part 75 was originally promulgated on January 11, 1993. Due to both experience gained in the implementation of Phase 1 and the early implementation of Phase 2 and petitions filed by several groups, EPA has prepared a number of changes to Part 75. This paper discusses what EPA anticipates these changes will be and how EPA anticipates that these changes will affect the regulated community. In addition, it discusses EPA`s expectations for certification applications for units using Appendix D and E.

Sheppard, M.; Culligan, K. [EPA, Washington, DC (United States). Acid Rain Div.

1995-12-31T23:59:59.000Z

278

HUD Choice Neighborhoods Implementation Grants  

Broader source: Energy.gov [DOE]

The U.S. Department of Housing and Urban Development (HUD) is accepting applications to support communities that have undergone a comprehensive local planning process and are ready to implement their "Transformation Plan" to redevelop the neighborhood.

279

Local Action Planning and Implementation  

Science Journals Connector (OSTI)

In its recently published Strategic Research Agenda the European wind energy platform, TPWind, proposes an ambitious vision ... Europe. In this vision, 300 GW of wind energy capacity will be implemented by 2030, ...

Maryke van Staden; Francesco Musco

2010-01-01T23:59:59.000Z

280

Stack Height Requirements (Ohio) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) Stack Height Requirements (Ohio) < Back Eligibility Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Ohio Program Type Environmental Regulations Provider Ohio Environmental Protection Agency This chapter of the law establishes that the Ohio Environmental Protection Agency provides regulations for stacks for industrial facilities. "Stack" means any chimney, flue, conduit or duct arranged to conduct any emissions to the ambient air, excluding flares. "Stack height" means the distance from the ground-level elevation at the base of the stack to the crown of the stack. If a stack arises from a building or other structure, the ground-level elevation of that building or structure will be

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

New York State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New York New York State Regulations: New York State of New York The primary responsibility for regulating oil and gas activities within New York resides with the Bureau of Oil and Gas Regulation in the Division of Mineral Resources (Office of Natural Resources) of the New York State Department of Environmental Conservation (NYSDEC). Other offices and divisions within the NYSDEC administer the major environmental protection laws. Contact New York State Department of Environmental Conservation Division of Mineral Resources Bureau of Oil and Gas Regulation 625 Broadway, 3rd Floor Albany, NY 12233-6500 (518) 402-8056 (phone) (518) 402-8060 (fax) Disposal Practices and Applicable Regulations Environmental conservation rules and regulations are contained in Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of New York (6 NYCRR). The rules and regulations for oil, gas and solution mining are provided in 6 NYCRR Parts 550-559.

282

Hitching of cable drawn implements  

E-Print Network [OSTI]

systems still use the concept of moving the carrier and The journal used as pattern for format and style was Transactions of the ASAE (American Society of Agricultural Engineers). power unit with the implement. A possible method of increasing power... systems still use the concept of moving the carrier and The journal used as pattern for format and style was Transactions of the ASAE (American Society of Agricultural Engineers). power unit with the implement. A possible method of increasing power...

Harrison, Carl Randall

2012-06-07T23:59:59.000Z

283

Regulations of the Arkansas Operating Air Permit Program (Arkansas) |  

Broader source: Energy.gov (indexed) [DOE]

Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) Regulations of the Arkansas Operating Air Permit Program (Arkansas) < Back Eligibility Commercial Construction Fuel Distributor Industrial Investor-Owned Utility Retail Supplier Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality The Regulations of the Arkansas Air Operating Program are adopted in accordance with the provisions of Part UU of the Arkansas Water and Air Pollution Control Act, Arkansas Code Annotated 8-4-101, and will be referred to in this description as "program", "regulations" and "regulation No. 26". The regulations are intended to meet the requirements of title of

284

Colorado/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Local Regulations Colorado/Transmission/Local Regulations < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process Under state law, Colorado counties and municipalities are given broad authority to plan for and regulate the use of land within their jurisdictions.[1] State statutes give local governments (counties and municipalities) the authorization to; Appoint planning commissions [2] which are required to prepare and adopt master plans or comprehensive plans for physical development within

285

Surveillance Guide - ENS 7.1 Definition of Design Requirements  

Broader source: Energy.gov (indexed) [DOE]

DEFINITION OF DESIGN REQUIREMENTS DEFINITION OF DESIGN REQUIREMENTS 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's program to establish comprehensive design requirements for modifications or new installations before detailed design work commences. The Facility Representative verifies that appropriate design requirements have been established and that the contractor is complying with applicable DOE requirements. 2.0 References 2.1 DOE 4700.1, Project Management System 2.2 DOE 5700.6C, Quality Assurance 2.3 DOE 6430.1A, General Design Criteria 3.0 Requirements Implemented This surveillance implements requirement EN-0008 from the RL S/RIDs. This requirement is contained in Secretary of Energy Notice

286

Computer Use Regulation Introduction  

E-Print Network [OSTI]

Computer Use Regulation #12;Introduction · The following training materials will reference the contents of the Computer Use Regulations, but should not serve as a substitute for reading the actual responsibilities NCSU employees have under the regulations. · North Carolina State University's computer networks

Liu, Paul

287

NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) |  

Broader source: Energy.gov (indexed) [DOE]

NARUC Releases Cybersecurity Primer for Utility Regulators (June NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) June 14, 2012 - 4:50pm Addthis The National Association of Regulatory Utility Commissioners (NARUC) has released "Cybersecurity for State Regulators," a primer that explains conceptual cybersecurity basics and points to additional resources that can help regulators develop internal cybersecurity expertise, ask questions of their utilities, engage in partnerships with the public and private sector to develop and implement cost-effective cybersecurity, and begin to explore the integrity of their internal cybersecurity practices. The primer was developed by the State Electricity Regulators Capacity Assessment and Training (SERCAT) program and was funded by a $4 million

288

State Water Permit Regulation (Arkansas) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permit Regulation (Arkansas) Permit Regulation (Arkansas) State Water Permit Regulation (Arkansas) < Back Eligibility Fuel Distributor Industrial Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Environmental Quality It is the purpose of this regulation to adopt standards applicable to the storage, discharge, or disposal of any waste which, if unregulated, will cause pollution of waters of the state or result in wastes being placed in a location where it is likely to cause pollution of the waters of the state. These standards are intended to protect public health and the environment, and prevent, control, or abate pollution. The State Water Permit Regulation is implemented to adopt standards applicable to the storage, discharge, or disposal of any waste that, if

289

Building Technologies Office: Implementation, Certification and Enforcement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation, Implementation, Certification and Enforcement to someone by E-mail Share Building Technologies Office: Implementation, Certification and Enforcement on Facebook Tweet about Building Technologies Office: Implementation, Certification and Enforcement on Twitter Bookmark Building Technologies Office: Implementation, Certification and Enforcement on Google Bookmark Building Technologies Office: Implementation, Certification and Enforcement on Delicious Rank Building Technologies Office: Implementation, Certification and Enforcement on Digg Find More places to share Building Technologies Office: Implementation, Certification and Enforcement on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Standardized Templates for Reporting Test Results

290

CRAD, Chemical Management Implementation - June 30, 2011 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Chemical Management Implementation - June 30, 2011 Chemical Management Implementation - June 30, 2011 CRAD, Chemical Management Implementation - June 30, 2011 June 30, 2011 Chemical Management Implementation Inspection Criteria, Approach, and Lines of Inquiry (HSS CRAD 45-31, Rev. 1) This document provides an overview of the Criteria, Activities, and Lines of Inquiry that will be used to collect information to evaluate the chemical management against DOE policy, regulatory requirements. Primary attention will be given to activities governed by the Occupational Safety and Health Administration's Hazard Communication Standards (29 CFR 1910.1200 and 29 CFR 1926.59) and Occupational Exposure to Chemicals in Laboratories (29 CFR 1910.1450). However, review of any activities for managing, storing, or using hazardous chemicals, pesticides, and toxic

291

Reference Manual and Procedures for Implementation of PURPA Standards in  

Broader source: Energy.gov (indexed) [DOE]

EPACT 2005 (March 2006) EPACT 2005 (March 2006) Reference Manual and Procedures for Implementation of PURPA Standards in EPACT 2005 (March 2006) This reference manual is intended to be used as an aid to state commissions and utilities as they consider the new federal standards that are part of the Energy Policy Act of 2005 (Subtitle E, "Amendments to PURPA," sections 1251, 1252, and 1254). It summarizes state commission and unregulated utility requirements and covers implementation procedures and issues to be considered. Manual for Implementation of PURPA Standards in EPACT 2005 (March 2006).pdf More Documents & Publications Reference Manual and Procedures for Implementation of PURPA Standards in EISA 2007 REPORT TO CONGRESS ON COMPETITION IN WHOLESALE AND RETAIL MARKETS FOR

292

CRAD, Chemical Management Implementation - June 30, 2011 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Chemical Management Implementation - June 30, 2011 Chemical Management Implementation - June 30, 2011 CRAD, Chemical Management Implementation - June 30, 2011 June 30, 2011 Chemical Management Implementation Inspection Criteria, Approach, and Lines of Inquiry (HSS CRAD 45-31, Rev. 1) This document provides an overview of the Criteria, Activities, and Lines of Inquiry that will be used to collect information to evaluate the chemical management against DOE policy, regulatory requirements. Primary attention will be given to activities governed by the Occupational Safety and Health Administration's Hazard Communication Standards (29 CFR 1910.1200 and 29 CFR 1926.59) and Occupational Exposure to Chemicals in Laboratories (29 CFR 1910.1450). However, review of any activities for managing, storing, or using hazardous chemicals, pesticides, and toxic

293

Reference Manual and Procedures for Implementation of PURPA Standards in  

Broader source: Energy.gov (indexed) [DOE]

EISA 2007 EISA 2007 Reference Manual and Procedures for Implementation of PURPA Standards in EISA 2007 This reference manual is intended to be used as an aid to state commissions and utilities as they consider the new federal standards that are part of the Energy Independence and Security Act of 2007 (or EISA, sections 374, 531, 532, and 1307). It summarizes state commission and unregulated utility requirements, covers implementation procedures and issues to be considered, and defines and discusses the new standards. Manual for Implementation of PURPA Standards in EISA 2007 (August 2008).pdf More Documents & Publications Reference Manual and Procedures for Implementation of PURPA Standards in EPACT 2005 (March 2006) Demand Response and Smart Metering Policy Actions Since the Energy Policy

294

A successful methodology for designing and implementing virtual work teams  

SciTech Connect (OSTI)

A system has been implemented at Los Alamos National Laboratory to rapidly staff and manage project teams. These project teams are created and subsequently perform their project functions using information technology as the communication medium. A simplified model of group interactions was used to guide the design and implementation of the system. The model uses three primary axes of group interactions to express the functional requirements that must be supported by a virtual work team application. The evolution of the approach and its relationship to traditional project management are described. A number of design characteristics were found to be critical to the success of the implementation and are presented. The technology and supporting processes and the business results stemming from implementation of the system are described in a limited manner.

Stuewe, R.B.; Barnes, M.G.; Hughes, D.K.

1997-11-01T23:59:59.000Z

295

VISA ISSUES The Spanish Ministry of Foreign Affairs and Cooperation establishes some requirements for  

E-Print Network [OSTI]

of the Schengen Borders Code · Art. 25 of the Aliens Act · Arts. 4 ff. of the Aliens Regulation These requirements

296

Evaluating manufacturing machine control language standards: an implementer's view  

Science Journals Connector (OSTI)

The focus of this paper is: how can standards for manufacturing machine control languages be evaluated? What is required of a standard defining one of these languages so that implementations will interoperate? The paper provides a set of specific questions ... Keywords: AP 238, BCL, DMIS, EIA-274-D, ISO 10303, ISO 14649, STEP-NC, control, language, machine, standard

Thomas R. Kramer

2007-08-01T23:59:59.000Z

297

Drug-Free Federal Workplace Testing Implementation Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The subject directive provides requirements and responsibilities for the implementation of a workplace program to test for the use of illegal drugs to facilitate the maintenance of a drug-free Federal workplace. In the course of the revision, the document number will change from DOE O 3792.3 to DOE O 343.1.

2012-12-06T23:59:59.000Z

298

Air Quality: Implementation Plan Department: Chemical and General Safety  

E-Print Network [OSTI]

Air Quality: Implementation Plan Department: Chemical and General Safety Program: Air Quality Owner: Program Manager Authority: ES&H Manual, Chapter 30, Air Quality1 The requirements of Chapter 30, "Air in place 1 SLAC Environment, Safety, and Health Manual (SLAC-I-720-0A29Z-001), Chapter 30, "Air Quality

Wechsler, Risa H.

299

A provably time-efficient parallel implementation of full speculation  

Science Journals Connector (OSTI)

Speculative evaluation, including leniency and futures, is often used to produce high degrees of parallelism. Understanding the performance characteristics of such evaluation, however, requires having a detailed understanding of the implementation. For ... Keywords: abstract machines, parallel languages, profiling semantics, speculation, threads

John Greiner; Guy E. Blelloch

1999-03-01T23:59:59.000Z

300

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

302

Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations  

SciTech Connect (OSTI)

In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

Witte, M.C.

1994-10-01T23:59:59.000Z

303

Federal Agency NEPA Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

Agency NEPA Implementing Procedures Agency NEPA Implementing Procedures Note: Some Departments' agencies have their own NEPA implementing procedures. To access Department-wide NEPA implementing procedures, click on the name of the Federal Department. To access NEPA implementing procedures for Department's agencies, click on the provided links. Department/ Agency: Division: Link: Department of Agriculture Agricultural Research Service http://www.ecfr.gov/cgi- in/text- idx?c=ecfr&SID=47c103e07fd64e933c7f74c 4b3c4ac9a&rgn=div5&view=text&node=7:6. 1 2 1 8&id 7 Animal and Plant Health Inspection Service http://www.ecfr.gov/cgi-bin/text- idx?c=ecfr&SID=47c103e07fd64e933c7f74c 4b3c4ac9a&rgn=div5&view=text&node=7:5. 1.1.1.21&idno=7 Farm Service Agency http://www.ecfr.gov/cgi-bin/text-

304

NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012)  

Broader source: Energy.gov [DOE]

The National Association of Regulatory Utility Commissioners (NARUC) has released Cybersecurity for State Regulators, a primer that explains conceptual cybersecurity basics and points to additional resources that can help regulators develop internal cybersecurity expertise, ask questions of their utilities, engage in partnerships with the public and private sector to develop and implement cost-effective cybersecurity, and begin to explore the integrity of their internal cybersecurity practices.

305

Launch implementation | Open Energy Information  

Open Energy Info (EERE)

Launch implementation Launch implementation Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

306

GP-8 LAWS AND REGULATIONS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOP (5-2011) DOP (5-2011) Supersedes (7-2010) issue DECLARATION of OCCUPATIONAL MEDICINE PROVIDER GENERAL INFORMATION PURPOSE All Contractors and their lower-tier subcontractors must comply with the Department of Energy's Worker Safety and Health Program regulation, 10 CFR 851, "Worker Safety and Health Program (WSHP). The WSHP enforces worker safety and health requirements including, but not limited to, standards of the Occupational Safety and Health Administration (OSHA), American National Standards Institute (ANSI) and Workers Compensation Laws as incorporated in the SNL WSHP. APPLICABILITY Contractors at all tiers which meet the applicability criteria must establish and provide comprehensive

307

Financing Project Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

This presentation covers typical sources of financing to implement energy efficiency projects in industry. Financing Project Implementation (August 11, 2010) More...

308

Financing Program Design and Implementation Considerations  

Broader source: Energy.gov [DOE]

Designing and implementing clean energy financing programs takes more than simply identifying applicablefinancing structures and implementing them. State and local governments should also take...

309

Federal Sector Renewable Energy Project Implementation: ""What...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by...

310

Template Implementing Agreement | Open Energy Information  

Open Energy Info (EERE)

Implementing Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Template Implementing AgreementLegal Published NA Year...

311

Preparing for Project Implementation Measuring Energy Achievements...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Project Implementation Measuring Energy Achievements Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

312

Preparing for Project Implementation Announcing "the PRIZE",...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

8 - Preparing for Project Implementation Announcing "the PRIZE" Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

313

Preparing for Project Implementation Motivating Employees to...  

Broader source: Energy.gov (indexed) [DOE]

Save Energy Now LEADER Web Conference Fred Schoeneborn, CEM, CEA June 9, 2010 7 - Preparing for Project Implementation Motivating Employees to Implement Projects Save Energy Now...

314

Preparing for Project Implementation Assigning Accountability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Project Implementation Assigning Accountability for Each Project Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

315

Natural Gas Regulation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas Regulation Natural Gas Regulation Natural Gas Regulation Natural Gas Regulation The Natural Gas Act of 1938, as amended, requires anyone who wants to import or export natural gas, including liquefied natural gas (LNG) from or to a foreign country must first obtain an authorization from the Department of Energy. The Office of Oil and Gas Global Security and Supply, Division of Natural Gas Regulatory Activities is the one-stop-shopping place to obtain these authorizations in the Department. The import/export authorizations are necessary for anyone who wants to import or export natural gas, including LNG. There are basically two types of authorizations, blanket and long-term authorizations. The blanket authorization enables you to import or export on a short-term or spot market basis for a period of up to two years. The

316

Implementation Standing Technical Committee Presentation  

Broader source: Energy.gov (indexed) [DOE]

Implementation Standing Technical Committee (I-STC) Meeting Deane Evans (NJIT) and Stacy Hunt (Confluence), co-chairs March 1, 2012 What is the I-STC? * Focused on identifying and documenting key barriers and opportunities in implementation of Building America (BA) research results How Does the I-STC Work? * Fosters discussion and prioritization of key research activities * Documents these for DOE/NREL planning purposes 2012 Focus * Clarify key priorities and ensure proper prioritization * Research and track activities that address these priorities inside and outside of BA * Try to knock some of these priorities off the list by documenting existing solutions * Identify critical tasks for 2013 and beyond

317

Sonoma County Solar Implementation Plan  

Broader source: Energy.gov [DOE]

Solar power and energy efficiency constitute a win?win formula to jump start the local economy and effectively respond to the climate change crisis. To address these important opportunities, this Sonoma County Solar Implementation Plan was prepared by Solar Sonoma County, a nonprofit public/private consortium of local governments, businesses, other entities and individuals working collaboratively to identify and implement initiatives to promote, expand, and accelerate solar power and energy efficiency throughout Sonoma County, under a U.S. Department of Energy Solar America Cities grant administered by the City of Santa Rosa.

318

Regulating forest practices in Texas: a problem analysis  

E-Print Network [OSTI]

REGULATING FOREST PRACTICES IN TEXAS: A PROBLEM ANALYSIS A Thesis by ALAN DALE DREESEN Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August 1977 Ma...]or Subject: Forestry REGULATING FOREST PRACTICES IN TEXAS: A PROBLEM ANALYSIS A Thesis by ALAN DALE DREESEN Approved as to style and content by: (Chair of Committee) ( ead of Depa t nt) (Member) (Member) August 1977 ABSTRACT Regulating Forest...

Dreesen, Alan D

1977-01-01T23:59:59.000Z

319

COGR Guide to the OMB Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards  

E-Print Network [OSTI]

al. (i.e., the Uniform Guidance) was released on December 26, 2013. The implementation date is scheduled for December 26, 2014, with the exception of the audit requirements, which are scheduled to be effective the first fiscal year that begins after December 26, 2014. This COGR Guide provides an assessment

Johnson, Eric E.

320

Microsoft Word - Requirements 0819.doc  

Broader source: Energy.gov (indexed) [DOE]

Studying the ) DOE-HQ-2009-0003-0819 Studying the ) DOE-HQ-2009-0003-0819 Communications Requirements of Electric ) (Noticed May 11, 2010) Utilities to Inform Federal Smart Grid Policy ) ) Comments of San Diego Gas & Electric Company San Diego Gas & Electric Company ("SDG&E") files these comments in response to the above-enumerated Request for Information noticed by the Department on May 11, 2010. SDG&E is a regulated public electric and gas utility operating pursuant to authorities granted to it by the Federal Energy Regulatory Commission and the State of California. SDG&E serves 3.4 million consumers in the San Diego and southern Orange County areas of California via 1.4 million electric meters and 830,000 gas meters. SDG&E's sister company, the Southern California Gas

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

APPLIANCE EFFICIENCY REGULATIONS FOR REFRIGERATORS AND FREEZERS  

E-Print Network [OSTI]

mobile equipment. (c) Central air conditioning heat pumps, regardless of capacity, except that requirements for central air conditioning heat pumps with cooling capacity of 135,000 Btu per hour or more#12;#12;APPLIANCE EFFICIENCY REGULATIONS FOR REFRIGERATORS AND FREEZERS ROOM AIR CONDITIONERS

322

Re: NBP RFI: Communications Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NBP RFI: Communications Requirements NBP RFI: Communications Requirements Re: NBP RFI: Communications Requirements CTIA - The Wireless Association® ("CTIA")1 submits this response to the Department of Energy's ("DOE") Request for Information ("RFI") regarding the communications requirements of utilities pursuant to the National Broadband Plan.2 Wireless communications are a critical component of "Smart Grids" and commercial wireless networks can readily satisfy the communications requirements of Smart Grid applications. As CTIA explains below, (1) commercial wireless solutions are already meeting communications needs to implement the Smart Grid with both utility network and consumer applications; (2) commercial wireless networks" ubiquity, security and reliability support the operational requirements of Smart Grid

323

Classification and disposal of radioactive wastes: History and legal and regulatory requirements  

SciTech Connect (OSTI)

This document discusses the laws and regulations in the United States addressing classification of radioactive wastes and the requirements for disposal of different waste classes. This review emphasizes the relationship between waste classification and the requirements for permanent disposal.

Kocher, D.C.

1990-01-01T23:59:59.000Z

324

Charities and Political Campaigning: The Impact of Risk-Based Regulation  

Science Journals Connector (OSTI)

This article examines the effects of the Charity Commissions implementation of risk-based regulation on the political campaigning activities of charities. In doing so ... with a brief exploration of the emergenc...

Karen Atkinson

2008-08-01T23:59:59.000Z

325

PIT Coating Requirements Analysis  

SciTech Connect (OSTI)

This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

MINTEER, D.J.

2000-10-20T23:59:59.000Z

326

Evolving regulation for the utility of the future  

SciTech Connect (OSTI)

Economic regulation began when much about retail electricity service was unknown. It supported a rapid evolution of technology, business models, and customers. Now, when much is unknown about the technology, business models, and customers of the future, economic regulation can serve this role again. Doing so requires only that we decide what to keep. (author)

Lesh, Pamela Grace

2010-03-15T23:59:59.000Z

327

Postexponential Regulation of sin Operon Expression in Bacillus subtilis  

Science Journals Connector (OSTI)

...of sin Operon Expression in Bacillus subtilis Sasha H. Shafikhani 1 Ines...required during the early stages of Bacillus subtilis sporulation is regulated by...as the common soil bacterium Bacillus subtilis frequently exist in slow- or...

Sasha H. Shafikhani; Ines Mandic-Mulec; Mark A. Strauch; Issar Smith; Terrance Leighton

2002-01-01T23:59:59.000Z

328

Alabama State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

State Regulations » Alabama State Regulations » Alabama State Regulations: Alabama State of Alabama The State Oil and Gas Board of Alabama, under the direction of the State Geologist and Oil and Gas Supervisor, is responsible for the regulation of oil and gas operations. The Board is divided into two administrative regions-north and south. The Board has broad authority in Alabama's oil and gas conservation statutes to promulgate and enforce rules and regulations to ensure the conservation and proper development of Alabama's petroleum resources. A major duty of the Board is to prevent pollution of fresh water supplies by oil, gas, salt water, or other contaminants resulting from oil and gas operations. The Alabama Department of Environmental Management (ADEM) administers the major federal environmental protection laws through regulations governing air pollution, water quality and supply, solid and hazardous waste management.

329

Pressure reducing regulator  

DOE Patents [OSTI]

A pressure reducing regulator that controls its downstream or outlet pressure to a fixed fraction of its upstream or inlet pressure is disclosed. The regulator includes a housing which may be of a titanium alloy, within which is located a seal or gasket at the outlet end which may be made of annealed copper, a rod, and piston, each of which may be made of high density graphite. The regulator is insensitive to temperature by virtue of being without a spring or gas sealed behind a diaphragm, and provides a reference for a system in which it is being used. The rod and piston of the regulator are constructed, for example, to have a 1/20 ratio such that when the downstream pressure is less than 1/20 of the upstream pressure the regulator opens and when the downstream pressure exceeds 1/20 of the upstream pressure the regulator closes. 10 figs.

Whitehead, J.C.; Dilgard, L.W.

1995-10-10T23:59:59.000Z

330

TOWARD MORE EFFECTIVE REGULATION  

SciTech Connect (OSTI)

This paper proposes a model relationship between the operator engaged in a hazardous activity, the regulator of that activity, and the general public. The roles and responsibilities of each entity are described in a way that allows effective communication flow. The role of the regulator is developed using the steam boiler as an example of a hazard subject to regulation; however, the model applies to any regulated activity. In this model the safety analyst has the extremely important role of communicating sometimes difficult technical information to the regulator in a way that the regulator can provide credible assurance to the general public as to the adequacy of the control of the hazardous activity. The conclusion asserts that acceptance of the model, understanding of the roles and responsibilities and definition of who communicates what information to whom will mitigate frustration on the part of each of the three entities.

J. GRAF

2000-06-01T23:59:59.000Z

331

DATA BASE DESIGN AND IMPLEMENTATION  

E-Print Network [OSTI]

, integrity constraints, A brief history of database applications When not to use database Fundamentals8/26/2010 1 1 ITCS 3160 DATA BASE DESIGN AND IMPLEMENTATION JING YANG 2010 FALL Class 2: Database System Concepts and Architecture Review of Class 1 2 Database MDatabase management systems (DBMS) Concept

Yang, Jing

332

DATA BASE DESIGN AND IMPLEMENTATION  

E-Print Network [OSTI]

Approach A Brief History of Database Applications When Not to Use a DBMS Fundamentals of Database Systems8/24/2010 1 ITCS 3160 DATA BASE DESIGN AND IMPLEMENTATION JING YANG 2010 FALL Class 1 Database and database users Outline Introduction A 2 An Example Characteristics of the Database Approach Actors

Yang, Jing

333

Designing andg g Implementing Effective  

E-Print Network [OSTI]

Designing andg g Implementing Effective Monitoring - Element IMonitoring Element I (Handbook is to protect and restore waterUltimate goal is to protect and restore water bodies for their intended uses. Presentation III 3 #12;The goal is to restoreThe goal is to restore d t t t b did t t t b diand protect water

334

NRC - regulator of nuclear safety  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) was formed in 1975 to regulate the various commercial and institutional uses of nuclear energy, including nuclear power plants. The agency succeeded the Atomic Energy Commission, which previously had responsibility for both developing and regulating nuclear activities. Federal research and development work for all energy sources, as well as nuclear weapons production, is now conducted by the U.S. Department of Energy. Under its responsibility to protect public health and safety, the NRC has three principal regulatory functions: (1) establish standards and regulations, (2) issue licenses for nuclear facilities and users of nuclear materials, and (3) inspect facilities and users of nuclear materials to ensure compliance with the requirements. These regulatory functions relate to both nuclear power plants and to other uses of nuclear materials - like nuclear medicine programs at hospitals, academic activities at educational institutions, research work, and such industrial applications as gauges and testing equipment. The NRC places a high priority on keeping the public informed of its work. The agency recognizes the interest of citizens in what it does through such activities as maintaining public document rooms across the country and holding public hearings, public meetings in local areas, and discussions with individuals and organizations.

NONE

1997-05-01T23:59:59.000Z

335

Scaling issues in ensemble implementations of the Deutsch-Jozsa algorithm  

E-Print Network [OSTI]

We discuss the ensemble version of the Deutsch-Jozsa (DJ) algorithm which attempts to provide a "scalable" implementation on an expectation-value NMR quantum computer. We show that this ensemble implementation of the DJ algorithm is at best as efficient as the classical random algorithm. As soon as any attempt is made to classify all possible functions with certainty, the implementation requires an exponentially large number of molecules. The discrepancies arise out of the interpretation of mixed state density matrices.

Arvind; David Collins

2003-07-21T23:59:59.000Z

336

Transportation System Requirements Document  

SciTech Connect (OSTI)

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

Not Available

1993-09-01T23:59:59.000Z

337

Air-Quality Regulations  

Science Journals Connector (OSTI)

n...Federal, state and/or local regulations constructed for the purpose of protecting air quality, e.g., low volatile organic compounds...

Jan W. Gooch

2011-01-01T23:59:59.000Z

338

Air-quality regulations  

Science Journals Connector (OSTI)

n....Federal, state and/or local regulations constructed for the purpose of protecting air quality, e.g., low volatile organic compounds...

2007-01-01T23:59:59.000Z

339

Organizing for demand-side management program implementation  

SciTech Connect (OSTI)

Organizing for the implementation of a demand-side management (DSM) program, is an exercise in planning and acquiring resources. However, the requirements for energy efficiency program implementation will vary and are dependent upon the type of mechanism employed in delivering the program. For example, commercial energy efficiency programs generally have three delivery mechanisms: rebate; direct installation; or DSM. For residential programs there are two unique methods, one a catalog program, which provides a source of purchasing energy efficient products, or a point-of-sale program, where rebates, in the form of coupons can be redeemed at the time of product purchase.

Obeiter, R.

1996-01-01T23:59:59.000Z

340

E-Print Network 3.0 - a20 regulates period Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rules (2) If inspection required by paragraph (h) Summary: is a crucial step in NOAA's review of its existing regulations. NOAA recognizes that the public comment period... ,...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Cyber Security Requirements for Risk Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice ensures that system owners consistently assess the threats to and vulnerabilities of systems in order to implement adequate security controls. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, and protect DOE information and information systems from unauthorized access, use, disclosure, modification, or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

2004-02-19T23:59:59.000Z

342

Federal Greenhouse Gas Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Requirements Requirements Federal Greenhouse Gas Requirements October 7, 2013 - 10:02am Addthis Executive Order (E.O.) 13514 expands the energy reduction and environmental requirements of Executive Order 13423 by making greenhouse gas (GHG) management a priority for the Federal government. Under Section 2 of E.O. 13514, each Federal agency must: Within 90 days of the order, establish and report to the CEQ Chair and OMB Director a percentage reduction target for agency-wide reductions of Scope 1 and Scope 2 GHG emissions in absolute terms by fiscal year 2020 relative to a fiscal year 2008 baseline of the agency's Scope 1 greenhouse gas emissions. In establishing the target, agencies shall consider reductions associated with: Reducing agency building energy intensity Increasing agency renewable energy use and implementing on-site renewable

343

Implementation Report: Energy Conservation Standards Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation Report: Implementation Report: Energy Conservation Standards Activities Submitted Pursuant to Section 141 of the Energy Policy Act of 2005 U.S. Department of Energy August 2006 Table of Contents List of Acronyms .............................................................................................................. 3 1 Introduction .............................................................................................................. 4 2 Multi-Year Schedule and Implementation Update............................................. 6 2.1 Multi-Year Schedule........................................................................................... 6 2.2 Implementation Update ......................................................................................

344

Resources on Implementing Energy Savings Performance Contracts  

Broader source: Energy.gov [DOE]

Many resources are available to help Federal agencies implement energy savings performance contracts (ESPCs).

345

Implementation Report: Energy Conservation Standards Activities  

Broader source: Energy.gov (indexed) [DOE]

Implementation Report: Implementation Report: Energy Conservation Standards Activities Submitted Pursuant to Section 141 of the Energy Policy Act of 2005 U.S. Department of Energy August 2006 Table of Contents List of Acronyms .............................................................................................................. 3 1 Introduction .............................................................................................................. 4 2 Multi-Year Schedule and Implementation Update............................................. 6 2.1 Multi-Year Schedule........................................................................................... 6 2.2 Implementation Update ......................................................................................

346

UNIDO-Training Program on Sustainable Energy Regulation and Policymaking  

Open Energy Info (EERE)

UNIDO-Training Program on Sustainable Energy Regulation and Policymaking UNIDO-Training Program on Sustainable Energy Regulation and Policymaking for Africa Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNIDO-Training Program on Sustainable Energy Regulation and Policymaking for Africa Agency/Company /Organization: United Nations Industrial Development Organization (UNIDO) Sector: Energy Topics: Implementation, Market analysis, Policies/deployment programs Resource Type: Publications, Guide/manual, Training materials Website: www.unido.org/index.php?id=1000755 UN Region: Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa UNIDO-Training Program on Sustainable Energy Regulation and Policymaking for Africa Screenshot References: UNIDO-Training Program on Sustainable Energy Regulation and Policymaking for Africa[1]

347

DOE Revises its NEPA Regulations, Including Categorical Exclusions |  

Broader source: Energy.gov (indexed) [DOE]

Revises its NEPA Regulations, Including Categorical Exclusions Revises its NEPA Regulations, Including Categorical Exclusions DOE Revises its NEPA Regulations, Including Categorical Exclusions September 30, 2011 - 2:30pm Addthis On September 27, 2011, the Department of Energy (DOE) approved revisions to its National Environmental Policy Act (NEPA) regulations, and on September 28th, submitted the revisions to the Federal Register. The final regulations, which become effective 30 days after publication in the Federal Register, are the culmination of a 2-year process to review and update DOE's NEPA implementing procedures. This process involved internal evaluation, public participation, and Council on Environmental Quality (CEQ) review. The revisions are designed to focus Departmental resources on projects with the potential for significant environmental impact, to better

348

esource Adequacy Implications of Forthcoming EPA Air Quality Regulation  

Broader source: Energy.gov (indexed) [DOE]

RESOURCE ADEQUACY IMPLICATIONS OF FORTHCOMING EPA AIR QUALITY REGULATIONS - EXECUTIVE SUMMARY RESOURCE ADEQUACY IMPLICATIONS OF FORTHCOMING EPA AIR QUALITY REGULATIONS - EXECUTIVE SUMMARY Executive Summary This report presents the results of an independent assessment by the U.S. Department of Energy (DOE) of the adequacy of U.S. electric generation resources under air pollution regulations being finalized by the U.S. Environmental Protection Agency (EPA). This report does not estimate the economic impacts of EPA regulations, nor does it provide detailed reliability assessments that planning authorities and other stakeholders will need to conduct to ensure deliverability of power and grid reliability during implementation of EPA rules. This report considers two EPA regulations, the Cross-State Air Pollution Rule (CSAPR) and the Mercury and Air Toxics Standards (MATS), that are widely expected to have the greatest impact on

349

Proposed changes for part N of suggested state regulations  

SciTech Connect (OSTI)

This paper discusses proposed changes for Part N regulations regarding naturally occuring radioactive materials. It describes the work of the Commission on NORM of the Conference of Radiation Control Program Directors (CRCPD), toward adjusting the regulations. A set of questions was formulated and a review panel established to address these questions and come back with recommended actions. The panel recommended the distinction that the material being regulated is `Technologically Enhanced Naturally Occurring Radioactive Material` (TENORM). By this they mean `naturally occurring radioactive material not regulated under the Atomic Energy Act (AEA) whose radionuclide concentrations have been increased by or as a result of human practices.` Recommendations also include: using a dose based instead of concentration based standard; refined definition of exemptions from regulations; exclusion of radon from Total Effective Dose Equivalent (TEDE) calculations; provide states flexibility in implementation; inclusion of prospective remedial and operations aspects for TENORM; provision of institutional controls.

Paris, R.

1997-02-01T23:59:59.000Z

350

Communication - An Effective Tool for Implementing ISO 14001/EMS  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) received ISO 14001/EMS certification in June 2002. Communication played an effective role in implementing ISO 14001/EMS at the INEEL. This paper describes communication strategies used during the implementation and certification processes. The INEEL achieved Integrated Safety Management System (ISMS) and Voluntary Protection Program (VPP) Star status in 2001. ISMS implemented a formal process to plan and execute work. VPP facilitated worker involvement by establishing geographic units at various facilities with employee points of contact and management champions. The INEEL Environmental Management System (EMS) was developed to integrate the environmental functional area into its ISMS and VPP. Since the core functions of ISMS, VPP, and EMS are interchangeable, they were easy to integrate. Communication is essential to successfully implement an EMS. (According to ISO 14001 requirements, communication interacts with 12 other elements of the requirements.) We developed communication strategies that integrated ISMS, VPP, and EMS. For example, the ISMS, VPP, and EMS Web sites communicated messages to the work force, such as VPP emphasizes the people side of doing business, ISMS emphasizes the system side of doing business, and EMS emphasizes the systems to protect the environment; but they all define work, identify and analyze hazards, and mitigate the hazards. As a result of this integration, the work force supported and implemented the EMS. In addition, the INEEL established a cross-functional communication team to assist with implementing the EMS. The team included members from the Training and Communication organizations, VPP office, Pollution Prevention, Employee and Media Relations, a union representative, facility environmental support, and EMS staff. This crossfunctional team used various communication strategies to promote our EMS to all organization levels and successfully implemented EMS activities through VPP geographic units. In summary, the ISMS and VPP process at the INEEL provided the basic framework of management support and worker involvement to implement our EMS. A cross-functional communication team was established to facilitate the implementation with great success. Communication has been an effective tool for implementing an ISO 14001/EMS at the INEEL.

Rachel Damewood; Bowen Huntsman

2004-04-01T23:59:59.000Z

351

Wumpus Advisor 1: A First Implementation Program that Tutors Logical and Probabilistic Reasoning Skills  

E-Print Network [OSTI]

The Wumpus Advisor program offers advice to a player involved in choosing the best move in a game for which competence in dealing with incomplete and uncertain knowledge is required. The design and implementation of ...

Stansfield, James L.

1976-10-01T23:59:59.000Z

352

Implementation of a Cloud Radiative Adjustment Method to Change the Climate Sensitivity of CAM3  

E-Print Network [OSTI]

Conducting probabilistic climate projections with a particular climate model requires the ability to vary the models characteristics, such as its climate sensitivity. In this study, we implement and validate a method to ...

Sokolov, Andrei P.

353

Attraction of carbon investments to implement the solar energy thermal utilization projects  

Science Journals Connector (OSTI)

The possibilities for attracting investments of carbon funds to implement solar energy thermal projects using solar collectors under the Clean Development Mechanism are ... about 10% of the funds required for project

R. A. Zakhidov

2007-10-01T23:59:59.000Z

354

Design and Implementation of Tracking System for Dish Solar Thermal Energy Based on Embedded System  

Science Journals Connector (OSTI)

Solar thermal energy has lots of advantages compare with photovoltage ... and stability cant satisfy the requirements of thermal energy system. This paper gives a design and implementation of tracking system for...

Jian Kuang; Wei Zhang

2012-01-01T23:59:59.000Z

355

Regulations & Rulemaking | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Determinations Federal Buildings Manufactured Housing Resource Center Regulations & Rulemaking The U.S. Department of Energy (DOE) is required by law to establish mandatory energy efficiency requirements for new federal commercial and residential buildings and to develop energy efficiency standards for manufactured homes. Federal law also requires that DOE publish determinations as to whether new editions of ASHRAE Standard 90.1 and the International Energy Conservation Code will improve energy efficiency. In response, DOE, through the Building Energy Codes Program (BECP) undertakes rulemaking processes to facilitate full disclosure of DOE's analyses and development methodologies, to solicit public input, and to publish final rules. DOE's rulemaking process involves

356

Self-regulated reionization  

E-Print Network [OSTI]

Recently, we have presented the first large-scale radiative transfer simulations of reionization. Here we present new simulations which extend the source halo mass range downward to 10^8M_solar, to capture the full range of halo masses thought to be primarily responsible for reionization by their star formation following atomic hydrogen radiative cooling and gravitational collapse. Haloes below about 10^9M_solar, however, are subject to Jeans-mass filtering in the ionized regions, which suppresses their baryonic content and their ability to release ionizing radiation. By including these smaller-mass haloes but accounting for their suppression, too, we find that reionization is ``self-regulating,'' as follows. As the mean ionized fraction rises, so does the fraction of the volume within which suppression occurs. Hence, the degree of suppression is related to the mean ionized fraction. Since low-mass haloes with high emissivity achieve a given mean ionized fraction earlier than do those with low efficiency, Jeans-mass filtering compensates for the difference in the emissivity of the suppressible haloes in these two cases. As a result, in the presence of lower-mass source haloes, reionization begins earlier, but the later stages of reionization and the time of overlap are dictated by the efficiency of the higher-mass haloes, independent of the efficiency of the suppressible, lower-mass haloes. Reionization histories consistent with current observational constraints are shown to be achievable with standard stellar sources in haloes above 10^8M_solar. Neither minihalos nor exotic sources are required, and the phenomenon of ``double reionization'' previously suggested does not occur. (abridged)

Ilian T. Iliev; Garrelt Mellema; Paul R. Shapiro; Ue-Li Pen

2006-07-22T23:59:59.000Z

357

availability in two different treatment implementations: (1) from  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

availability in two different treatment implementations: (1) from availability in two different treatment implementations: (1) from seedlings exposed to 360, 550, and 700 mu mol mol(-1) CO2 in a glasshouse; and (2) from intact adults exposed to 360 and 550 mu mol mol(-1) CO2 at the Nevada Desert FACE (Free Air CO2 Enrichment) Facility. FACE and glasshouse wed-watered Larrea significantly down- regulated photosynthesis at elevated CO2, reducing maximum photosynthetic rate (A(max)), carboxylation efficiency (CE), and Rubisco catalytic sites, whereas droughted Larrea showed a differing response depending on treatment technique. A(max) and CE were lower in droughted Larrea compared with well-watered plants, and CO2 had no effect on these reduced photosynthetic parameters. However, Rubisco catalytic sites decreased in droughted Larrea at elevated CO2. Operating

358

Mandatory Supervisory Training Requirements  

Broader source: Energy.gov (indexed) [DOE]

Mandatory Supervisory Training Requirements Mandatory Supervisory Training Requirements All DOE supervisors, managers, and executives will comply with mandatory supervisory training requirements (5 CFR 412; 5 CFR 315.801; 5 CFR 315.901; DOE O 360.1; and DOE O 320.1): * New supervisors: 80 hours of supervisory training, with 40 hours required to be completed during the supervisory probationary period. * Experienced supervisors: minimum of 8 hours of supervisory training each year. The Office of Learning and Workforce Development has developed an inventory of training and developmental activities that will meet the supervisory training requirements. The DOE courses Supervisory Essentials (32 hours) and Navigating the Federal Hiring Process (8 hours) are required to fulfill the first year 40-hour training

359

Proactive DSA application and implementation  

SciTech Connect (OSTI)

Data authentication as provided by digital signatures is a well known technique for verifying data sent via untrusted network links. Recent work has extended digital signatures to allow jointly generated signatures using threshold techniques. In addition, new proactive mechanisms have been developed to protect the joint private key over long periods of time and to allow each of the parties involved to verify the actions of the other parties. In this paper, the authors describe an application in which proactive digital signature techniques are a particularly valuable tool. They describe the proactive DSA protocol and discuss the underlying software tools that they found valuable in developing an implementation. Finally, the authors briefly describe the protocol and note difficulties they experienced and continue to experience in implementing this complex cryptographic protocol.

Draelos, T.; Hamilton, V.; Istrail, G.

1998-05-03T23:59:59.000Z

360

Implementing 10 CFR Part 830 Subpart B at WIPP  

SciTech Connect (OSTI)

Implementation of Title 10 Code of Federal Regulations Part 830, Subpart B Nuclear Safety Management (1) was accomplished at the Waste Isolation Pilot Plant (WIPP) in a timely and efficient manner. The primary reason the transition went smoothly was that the existing safety analysis was relatively new, initially developed in 1995, and written in accordance with the safe harbor document DOE-STD-3009 (2). The WIPP Safety Analysis Report (SAR) (3) is kept up-to-date with the unreviewed safety question (USQ) process and thorough oversight and input provided by DOE-Carlsbad Field Office (CBFO) documented in the annual safety evaluation report (SER) process.

McCormick, J.; Ortiz, C.; Carter, M.; Niemi, B.; Farrell, R.

2002-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ASCR Science Network Requirements  

E-Print Network [OSTI]

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

362

Transuranic Waste Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

1999-07-09T23:59:59.000Z

363

Science Requirements Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Presentations Galleries ESnet Awards and Honors ESnet Live Blog Home Science Engagement Science Requirements Reviews Science Engagement Move your data Programs...

364

Cyber Security Requirements for Wireless Devices and Information Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice establishes DOE policy requirements and responsibilities for using wireless networks and devices within DOE and implements the requirements of DOE 0 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, including requirements for cyber resource protection, risk management, program evaluation, and cyber security plan development and maintenance. No cancellation. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

2004-02-11T23:59:59.000Z

365

Gas and Electric Utilities Regulation (South Dakota) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Gas and Electric Utilities Regulation (South Dakota) Gas and Electric Utilities Regulation (South Dakota) Gas and Electric Utilities Regulation (South Dakota) < Back Eligibility Utility Commercial Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Retail Supplier Institutional Systems Integrator Fuel Distributor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Dakota Program Type Generation Disclosure Provider South Dakota Public Utilities Commission This legislation contains provisions for gas and electric utilities. As part of these regulations, electric utilities are required to file with the

366

Nebraska Hazardous Waste Regulations (Nebraska) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nebraska Hazardous Waste Regulations (Nebraska) Nebraska Hazardous Waste Regulations (Nebraska) Nebraska Hazardous Waste Regulations (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Nebraska Program Type Siting and Permitting Provider Environmental Quality These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to hazardous waste management, waste standards, permitting requirements, and land disposal restrictions

367

Office of the Assistant General Counsel for Legislation, Regulation and  

Broader source: Energy.gov (indexed) [DOE]

Legislation, Regulation and Energy Efficiency Legislation, Regulation and Energy Efficiency Office of the Assistant General Counsel for Legislation, Regulation and Energy Efficiency The Office of the Assistant General Counsel for Legislation, Regulation and Energy Efficiency (GC-71) provides legal support and advice on legislative matters throughout the Department. It participates in the development of DOE views on pending legislation, drafts DOE legislative proposals and supporting documents, obtains interagency clearances from the Office of Management and Budget, and prepares, coordinates, and reviews bill comments to Congressional committees. The office also provides legal counsel and rulemaking support to programs throughout DOE on administrative requirements for developing DOE rules, directives, and other generally

368

Annual Energy Outlook with Projections to 2025- Legislation and Regulations  

Gasoline and Diesel Fuel Update (EIA)

California Low Emission Vehicle Program and Carbon Standard for Light-Duty Vehicles California Low Emission Vehicle Program and Carbon Standard for Light-Duty Vehicles Legislation and Regulations. California Low Emission Vehicle Program The Low Emission Vehicle Program (LEVP) was originally passed into legislation in 1990 in the State of California. It began as the implementation of a voluntary opt-in pilot program under the purview of CAAA90, which included a provision that other States could “opt in” to the California program to achieve lower emissions levels than would otherwise be achieved through CAAA90. The 1990 LEVP was an emissions-based policy, setting sales mandates for three categories of vehicles: low-emission vehicles (LEVs), ultra-low-emission vehicles (ULEVs), and zero-emission vehicles (ZEVs). The mandate required that ZEVs make up 2 percent of new vehicle sales in California by 1998, 5 percent by 2001, and 10 percent by 2003. At that time, the only vehicles certified as ZEVs by the California Air Resources Board (CARB) were battery-powered electric vehicles [1].

369

Former Worker Medical Screening Program Implementation | Department of  

Broader source: Energy.gov (indexed) [DOE]

Former Former Worker Medical Screening Program Implementation Former Worker Medical Screening Program Implementation Program implementation focuses on four specific activities, which are: Outreach: Identify and notify eligible DOE workers about FWP medical screening services. Medical Screening: Provide medical screening exams that are designed to check for health conditions related to occupational exposures to former workers who choose to participate in the program, including a re-screen exam every three years. Communicating Results: Provide exam results to participants, as well as information regarding any conditions that may require follow-up medical care with their personal physicians or specialists, and provide information regarding possible compensation for work-related illnesses. Follow-up care

370

Sodium-Bearing Waste Treatment Alternatives Implementation Study  

SciTech Connect (OSTI)

The purpose of this document is to discuss issues related to the implementation of each of the five down-selected INEEL/INTEC radioactive liquid waste (sodium-bearing waste - SBW) treatment alternatives and summarize information in three main areas of concern: process/technical, environmental permitting, and schedule. Major implementation options for each treatment alternative are also identified and briefly discussed. This report may touch upon, but purposely does not address in detail, issues that are programmatic in nature. Examples of these include how the SBW will be classified with respect to the Nuclear Waste Policy Act (NWPA), status of Waste Isolation Pilot Plant (WIPP) permits and waste storage availability, available funding for implementation, stakeholder issues, and State of Idaho Settlement Agreement milestones. It is assumed in this report that the SBW would be classified as a transuranic (TRU) waste suitable for disposal at WIPP, located in New Mexico, after appropriate treatment to meet transportation requirements and waste acceptance criteria (WAC).

Charles M. Barnes; James B. Bosley; Clifford W. Olsen

2004-07-01T23:59:59.000Z

371

Application of the office of civilian radioactive waste management QA requirements to the hanford spent nuclear fuel project  

SciTech Connect (OSTI)

This document identifies, at a high-level, the Hanford SNF Project systems, structures, and components and activities that must implement to some degree the OCRWM QARD requirements to ensure compliance with RL direction. This document will also be used to support development of a QARD requirements matrix for the implementation of QARD requirements.

MCCORMACK, R.L.

1999-05-12T23:59:59.000Z

372

CH2M Hill Hanford Group, Inc. Standards and Requirements Identification Document (SRID) Requirements Management System and Requirements Specification  

SciTech Connect (OSTI)

The current Tank Farm Contractor (TFC) for the U. S. Department of Energy, Office of River Protection (ORP), River Protection Project (RPP), CH2M Hill Hanford Group, Inc. (CHG), will use a computer based requirements management system. The system will serve as a tool to assist in identifying, capturing, and maintaining the Standards/Requirements Identification Document (S/RID) requirements and links to implementing procedures and other documents. By managing requirements as one integrated set, CHG will be able to carry out its mission more efficiently and effectively. CHG has chosen the Dynamic Object Oriented Requirements System (DOORS{trademark}) as the preferred computer based requirements management system. Accordingly, the S/RID program will use DOORS{trademark}. DOORS{trademark} will replace the Environmental Requirements Management Interface (ERMI) system as the tool for S/RID data management. The DOORS{trademark} S/RID test project currently resides on the DOORSTM test server. The S/RID project will be migrated to the DOORS{trademark} production server. After the migration the S/RID project will be considered a production project and will no longer reside on the test server.

JOHNSON, A.L.

2000-11-30T23:59:59.000Z

373

Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico  

SciTech Connect (OSTI)

In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million.

MOORE,DARLENE R.; SCHRADER,SCOTT A.; KING,GABRIEL G.; CORMIER,JOHN

2000-01-26T23:59:59.000Z

374

Inequality and the Politics of Social Policy Implementation: Gender, Age and Chile's 2004 Health Reforms  

E-Print Network [OSTI]

Reforms CHRISTINA EWIG and GASTO´ N A. PALMUCCI * University of Wisconsin-Madison, USA Summary implementation. We examine the 2004 Chilean health reforms that sought to regulate private insurers, and measure their effects on gender and age inequality. We find that reforms intended to decrease these inequalities largely

Wisconsin at Madison, University of

375

A secure mHealth application for EMS: design and implementation  

Science Journals Connector (OSTI)

Healthcare organizations are looking to implement mobile health applications that significantly improve healthcare delivery, yet adhere to existing health information privacy and security rules and regulations. However, these same organizations are struggling ... Keywords: HIPAA, emergency medical services, mHealth, mobile health, security

Abdullah Murad; Benjamin Schooley; Yousef Abed

2013-11-01T23:59:59.000Z

376

IMPLEMENTING PUBLIC PLATFORMS FOR MOBILE PHONE CONTENT SERVICES: STANDARDIZATION IN AN ERA OF  

E-Print Network [OSTI]

IMPLEMENTING PUBLIC PLATFORMS FOR MOBILE PHONE CONTENT SERVICES: STANDARDIZATION IN AN ERA@ifi.uio.no Abstract Mobile Telecommunication standardization in Europe builds on a history formed by European and International standardization bodies, the governments as regulators and the R&D departments of PPT

Sahay, Sundeep

377

ADVERTISING MAJOR REQUIREMENTS CHECKLIST  

E-Print Network [OSTI]

ADVERTISING MAJOR REQUIREMENTS CHECKLIST Name: ID#: Expected Graduation Date: Course Number and Title Waiver/Substitution Semester Units FOUNDATION (16 units required) ADVT 341 Advertising Principles & Practice (4) PLUS COMS 202 Rhetoric and the Public Sphere (4) OR RHET 216 Writing for Advertising (4) PLUS

Galles, David

378

High School if required  

E-Print Network [OSTI]

Chemistry II CHEM AP 4-5 Lab required @ UNLV; contact Chemistry PHYS 182 & 182L Engineering Physics III PHYS General Chemistry I CHEM AP 3 Lab required @ UNLV; contact Chemistry CHEM 241 Organic Chemistry I & CHEM 347 Lab Techniques of Organic Chem I CHEM 242 Organic Chemistry II & CHEM 348 Lab Techniques

Walker, Lawrence R.

379

Methods, systems and apparatus for synchronous current regulation of a five-phase machine  

DOE Patents [OSTI]

Methods, systems and apparatus are provided for controlling operation of and regulating current provided to a five-phase machine when one or more phases has experienced a fault or has failed. In one implementation, the disclosed embodiments can be used to synchronously regulate current in a vector controlled motor drive system that includes a five-phase AC machine, a five-phase inverter module coupled to the five-phase AC machine, and a synchronous current regulator.

Gallegos-Lopez, Gabriel; Perisic, Milun

2012-10-09T23:59:59.000Z

380

Design and Implementation of an Underlay Control Channel for Cognitive Radios  

SciTech Connect (OSTI)

Implementation of any cognitive radio network requires an effective control channel that can operate under various modes of activity from the primary users. This paper reports the design and implementation of a filter bank multicarrier spread spectrum (FBMC-SS) system for use as the control channel in cognitive radio networks. The proposed design is based on a filtered multitone (FMT) implementation. Carrier and timing acquisition and tracking methods as well as a blind channel estimation method are developed for the proposed control channel. We also report an implementation of the proposed FBMC-SS system on a hardware platform; a FlexRIO FPGA module from National Instruments.

Daryl Wasden; Hussein Moradi; Behrouz Farhang-Boroujeny

2012-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Indiana State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Indiana Indiana State Regulations: Indiana State of Indiana The Indiana Department of Natural Resources (DNR) Division of Oil and Gas regulates petroleum exploration, production, and site abandonment activities, underground injection control, test hole drilling, and geophysical surveying operations. Otherwise, the Indiana Department of Environmental Management (IDEM) administers the major environmental protection laws. Contact Division of Oil and Gas (Indianapolis Central Office) 402 West Washington Street, Room 293 Indianapolis, IN 46204 (317) 232-4055 (phone) (317) 232-1550 (fax) (Division Contacts) Indiana Department of Environmental Management P.O. Box 6015 Indianapolis, IN 46206-6015 (317) 232-8603 (phone) (317) 233-6647 (fax) Disposal Practices and Applicable Regulations

382

Regulations and Procedures Manual  

E-Print Network [OSTI]

Quality Assurance and Conduct of Operations requirements forassurance and conduct- of-operations principles. These

Young, Lydia J.

2014-01-01T23:59:59.000Z

383

Single-Step Implementation of Universal Quantum Gates  

SciTech Connect (OSTI)

We construct optimized implementations of the controlled-NOT and other universal two-qubit gates that, unlike many of the previously proposed protocols, are carried out in a single step. The new protocols require tunable interqubit couplings but, in return, show a significant improvement in the quality of gate operations. We make specific predictions for coupled Josephson junction qubits and compare them with the results of recent experiments.

Grigorenko, I.A.; Khveshchenko, D.V. [Department of Physics and Astronomy, University of North Carolina, Chapel Hill, North Carolina 27599 (United States)

2005-09-09T23:59:59.000Z

384

Technical Support Document for the National Environmental Policy Act Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

Final Rulemaking, 10 CFR part 1021 Page 1 Final Rulemaking, 10 CFR part 1021 Page 1 Department of Energy Technical Support Document for the National Environmental Policy Act Implementing Procedures Final Rule September 27, 2011 This Technical Support Document and the preambles to the Department of Energy"s (DOE"s) Notice of Proposed Rulemaking (76 FR 214) and final rule provide the supporting basis for the changes being made to DOE"s National Environmental Policy Act (NEPA) Implementing Procedures. In this Technical Support Document, DOE presents each of the changes to its NEPA implementing regulations (10 CFR part 1021, Subparts B, C, and D) and provides supplementary support for the changes. The left column of the table below shows the changes to the existing regulations and the right column provides

385

Full SPP Partnership Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partnership Requirements: Partnership Requirements: ENERGY STAR Partnership for Commercial & Industrial Service and Product Providers (SPP) Eligible Organizations Companies providing energy efficiency services and products to commercial buildings and industrial manufacturing facilities/plants are eligible for the Service and Product Provider (SPP) partnership, but must meet certain requirements as specified below. Types of eligible companies include: architecture, distributor, energy consultant/energy management services, energy improvement contractor, energy information services, energy services company (ESCO), engineering, equipment manufacturer, financial services, on-site energy production services, unregulated energy retailer and marketer, or other supplier of standard energy-efficient products and/or services for commercial buildings and/or

386

Cyber Security Process Requirements Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes the minimum implementation standards for cyber security management processes throughout the Department. No cancellation.

2008-08-12T23:59:59.000Z

387

Federal Requirements for Sustainable Buildings | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Sustainable Buildings & Campuses » Federal Program Areas » Sustainable Buildings & Campuses » Federal Requirements for Sustainable Buildings Federal Requirements for Sustainable Buildings October 4, 2013 - 4:42pm Addthis Federal agencies have to meet laws and regulations, which set energy management and efficiency requirements for Federal buildings, including reducing energy consumption and increasing the use of renewable energy. Learn about Federal sustainability requirements for buildings and facilities by: Law and regulation Topic. Also learn more about the Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings. Reporting Federal legislation requires agencies to annually report on facility energy consumption and management. For more information, see Federal Facility

388

GN470108, ES&H General Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, ES&H General Requirements 8, ES&H General Requirements Sponsor: Michael W. Hazen, 4000 Revision Date: October 26, 2009 This document is no longer a CPR. This document implements the requirements of Corporate procedure ESH100.1.GP.2, Implement ES&H General Requirements. IMPORTANT NOTICE: A printed copy of this document may not be the document currently in effect. The official version is the online version located on the Sandia Restricted Network (SRN) GN470108 - ES&H GENERAL REQUIREMENTS Subject Matter Expert: Bradley S. Elkin; CA Counterpart: Dennis J. Beyer GN470108, Issue A Revision Date: October 26, 2009; Replaces Document Dated: January 25, 2008 Change History This document contains the following sections: Overview Why ES&H What is the Scope Who Does What Appendix A, Operating Process for Standing ES&H Committees

389

NBP RFI: Communications Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NBP RFI: Communications Requirements NBP RFI: Communications Requirements NBP RFI: Communications Requirements Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission substations connected via 1,300 miles of transmission lines, together feeding over 350 distribution substations,

390

Annual Energy Outlook 2001 - Legislation and Regulations  

Gasoline and Diesel Fuel Update (EIA)

Legislation & Regulations Legislation & Regulations Nitrogen Oxide Emission Caps Heavy-Duty Vehicle Emissions and Diesel Fuel Quality Standards FERC Order 2000 Banning or Reducing the Use of MTBE in Gasoline Updates on State Renewable Portfolio Standards and Renewable Energy Mandates Proposed Changes to RFG Oxygen Standard FERC Order 637 Proposed Limits on Benzene in Gasoline Royalty Rules Low-Emission Vehicle Program Tier 2 Vehicle Emissions and Gasoline Sulfur Standards Appliance Efficiency Standards Petroleum Reserves Introduction Because analyses by the Energy Information Administration (EIA) are required to be policy-neutral, the projections in this Annual Energy Outlook 2001 (AEO2001) are based on Federal, State, and local laws and regulations in effect on July 1, 2000. The potential impacts of pending or

391

Interviewee Travel Regulations Scope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3/2012 3/2012 Interviewee Travel Regulations Scope These regulations apply to the reimbursement of round-trip travel expenses incurred by interviewees. These regulations do not apply to applicants who live within a 50-mile radius of Los Alamos based on the Rand McNally Standard Highway Mileage Guide. Reimbursement With the exception of airfare, interviewees will be reimbursed for travel expenses according to Federal travel regulations. For interviewees, airfare reimbursement is limited to the lesser of the standard coach airfare or the actual amount paid. The lowest available airfare should be obtained based on the official business dates and locations. The reimbursement amount will be based on the most direct route available between the interviewee's residence and the laboratory. Costs incurred over the lowest available fare will be the

392

New Mexico State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New Mexico New Mexico State Regulations: New Mexico State of New Mexico The Oil Conservation Division (OCD) in the New Mexico Energy, Minerals and Natural Resources Department regulates oil and gas and geothermal operations in New Mexico. The OCD has the responsibility to gather oil and gas production data, permit new wells, establish pool rules and oil and gas allowables, issue discharge permits, enforce rules and regulations of the division, monitor underground injection wells and ensure that abandoned wells are properly plugged and the land is responsibly restored. Otherwise, the New Mexico Environment Department (NMED) administers the major environmental protection laws. The Water Quality Control Commission (WQCC), which is administratively attached to the NMED, assigns responsibility for administering its regulations to constituent agencies, including the OCD.

393

California Energy Commission REGULATIONS  

E-Print Network [OSTI]

California Energy Commission REGULATIONS NONRESIDENTIAL BUILDING ENERGY Office Manager High Performance Buildings and Standards Development Office Dave Ashuckian Deputy Director Efficiency and Renewable Energy Division Robert Oglesby Executive Director DISCLAIMER

394

A Furnace Temperature Regulator  

Science Journals Connector (OSTI)

Synopsis.By making the heating coil of an electric furnace one arm of a wheatstone bridge, and combining this with a galvanometer regulator, thus keeping constant the resistance of the coil, we can, regardless of variations in the current supply, and with no attention, maintain constant the temperature of furnaces not too directly influenced by the temperature of the room, or where the surrounding air is kept constant. The power available in this regulator is relatively very great indeed; nothing has to be inserted within the furnace cavity, and the lag is practically nothing; the regulator is often almost at its best under conditions most unfavorable to other regulators. It has held a small furnace constant to 0.1 for hours at temperatures from 500 to 1400.

Walter P. White and Leason H. Adams.

1919-07-01T23:59:59.000Z

395

Promulgating Nuclear Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

1996-05-15T23:59:59.000Z

396

Requirements for security signalling  

SciTech Connect (OSTI)

There has been some interest lately in the need for ``authenticated signalling``, and the development of signalling specifications by the ATM Forum that support this need. The purpose of this contribution is to show that if authenticated signalling is required, then supporting signalling facilities for directory services (i.e. key management) are also required. Furthermore, this contribution identifies other security related mechanisms that may also benefit from ATM-level signalling accommodations. For each of these mechanisms outlined here, an overview of the signalling issues and a rough cut at the required fields for supporting Information Elements are provided. Finally, since each of these security mechanisms are specified by a number of different standards, issues pertaining to the selection of a particular security mechanism at connection setup time (i.e. specification of a required ``Security Quality of Service``) are also discussed.

Pierson, L.G.; Tarman, T.D.

1995-02-05T23:59:59.000Z

397

Timeline for Net Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

17.5 7302010 Yes Biennially x By July 31 of each Forecast Year, BPA publishes all Load Following customers' Net Requirements data for the two years of the upcoming Rate...

398

Transportation Infrastructure Requirement Resources  

Broader source: Energy.gov [DOE]

Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum...

399

BES Science Network Requirements  

E-Print Network [OSTI]

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

400

Goals and Requirements  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) is committed to meeting the goals of Executive Order (E.O.) 13514, E.O. 13423, and related statutory requirements through the Strategic Sustainability Performance Plan (SSPP).

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Policies for implementing network firewalls  

SciTech Connect (OSTI)

Corporate networks are frequently protected by {open_quotes}firewalls{close_quotes} or gateway systems that control access to/from other networks, e.g., the Internet, in order to reduce the network`s vulnerability to hackers and other unauthorized access. Firewalls typically limit access to particular network nodes and application protocols, and they often perform special authentication and authorization functions. One of the difficult issues associated with network firewalls is determining which applications should be permitted through the firewall. For example, many networks permit the exchange of electronic mail with the outside but do not permit file access to be initiated by outside users, as this might allow outside users to access sensitive data or to surreptitiously modify data or programs (e.g., to intall Trojan Horse software). However, if access through firewalls is severely restricted, legitimate network users may find it difficult or impossible to collaborate with outside users and to share data. Some of the most serious issues regarding firewalls involve setting policies for firewalls with the goal of achieving an acceptable balance between the need for greater functionality and the associated risks. Two common firewall implementation techniques, screening routers and application gateways, are discussed below, followed by some common policies implemented by network firewalls.

Brown, C.D.

1994-05-01T23:59:59.000Z

402

A National Forum on Demand Response: Results on What Remains to Be Done to Achieve Its Potential- Program Design and Implementation Working Group  

Broader source: Energy.gov [DOE]

In July 2011, the Federal Energy Regulatory Commission's (FERC) staff and the Department of Energy (DOE) jointly submitted to Congress a required Implementation Proposal for the National Action...

403

Examining the Relationship Between Implementation and Student Outcomes: The Application of an Implementation Measurement Framework .  

E-Print Network [OSTI]

??The current study evaluated the implementation of evidence-based reading interventions using a multifaceted implementation measurement approach. Multilevel modeling was used to examine how three direct (more)

Spear, Caitlin

2015-01-01T23:59:59.000Z

404

Unveiling the Implementation Guide | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Implementing Industrial Energy Assessment Recommendations Building America Technology Solutions for New and Existing Homes: Foundation Heat Exchanger, Oak Ridge, Tennessee...

405

August 25, 2011 Clinical Trials Monitoring Assistance Program for FDA Regulated Human Subjects Research  

E-Print Network [OSTI]

, mandatory review of evidence that an appropriate monitoring plan is being implemented and documented with the protocol, standard operating procedures (SOPs), GCP, and the applicable regulatory requirement(s)." (ICH E6 design and development of a monitoring plan and strategies for the implementation of the plan. S

Grishok, Alla

406

Level Set Implementations on Unstructured Point Cloud  

E-Print Network [OSTI]

Level Set Implementations on Unstructured Point Cloud by HO, Hon Pong A Thesis Submitted;Level Set Implementations on Unstructured Point Cloud by HO, Hon Pong This is to certify that I have implementations on unstructured point cloud 15 3.1 Level set initialization

Duncan, James S.

407

Implementation of the Deutsch Jozsa algorithm on an ion-trap  

E-Print Network [OSTI]

.............................................................. Implementation of the Deutsch­ Jozsa on both sides) requires an examination of each side. However, the analogous quantum procedure (the Deutsch­Jozsa algorithm1,2 ) requires just one examination step. The Deutsch­Jozsa algorithm has been real- ized

Blatt, Rainer

408

Principle and implementations of a refracto-nephelo-turbidi-meter for  

E-Print Network [OSTI]

1 Principle and implementations of a refracto-nephelo-turbidi-meter for seawater measurements B of physical oceanography requires a compact high-resolution in-situ salino-turbidi-meter to measure these two the requirements and challenges of refracto-turbidi-meter design from their measurement principles and correlations

Paris-Sud XI, Université de

409

Energy Department Revises NEPA Regulations to Improve Efficiency |  

Broader source: Energy.gov (indexed) [DOE]

Revises NEPA Regulations to Improve Efficiency Revises NEPA Regulations to Improve Efficiency Energy Department Revises NEPA Regulations to Improve Efficiency October 3, 2011 - 12:39pm Addthis Washington, D.C. -- The U.S. Department of Energy will save time and money in its environmental reviews of many proposed energy projects under revised regulations approved September 27, 2011, to implement the National Environmental Policy Act (NEPA). The revisions focus on the Department's categorical exclusion provisions, and reflect the first update to these provisions in 15 years. A categorical exclusion applies to a class of actions that an agency has determined normally do not individually or cumulatively have a significant impact on the human environment. "Updating our NEPA rule allows us to accomplish our environmental reviews

410

Code of Federal Regulations Procedural Rules for DOE Nuclear Activities  

Broader source: Energy.gov (indexed) [DOE]

Code of Federal Regulations Procedural Rules for DOE Nuclear Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules,

411

Diamond turning machine controller implementation  

SciTech Connect (OSTI)

The standard controller for a Pnuemo ASG 2500 Diamond Turning Machine, an Allen Bradley 8200, has been replaced with a custom high-performance design. This controller consists of four major components. Axis position feedback information is provided by a Zygo Axiom 2/20 laser interferometer with 0.1 micro-inch resolution. Hardware interface logic couples the computers digital and analog I/O channels to the diamond turning machine`s analog motor controllers, the laser interferometer, and other machine status and control information. It also provides front panel switches for operator override of the computer controller and implement the emergency stop sequence. The remaining two components, the control computer hardware and software, are discussed in detail below.

Garrard, K.P.; Taylor, L.W.; Knight, B.F.; Fornaro, R.J.

1988-12-01T23:59:59.000Z

412

Used fuel disposition campaign international activities implementation plan.  

SciTech Connect (OSTI)

The management of used nuclear fuel and nuclear waste is required for any country using nuclear energy. This includes the storage, transportation, and disposal of low and intermediate level waste (LILW), used nuclear fuel (UNF), and high level waste (HLW). The Used Fuel Disposition Campaign (UFDC), within the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE), Office of Fuel Cycle Technology (FCT), is responsible for conducting research and development pertaining to the management of these materials in the U.S. Cooperation and collaboration with other countries would be beneficial to both the U.S. and other countries through information exchange and a broader participation of experts in the field. U.S. participation in international UNF and HLW exchanges leads to safe management of nuclear materials, increased security through global oversight, and protection of the environment worldwide. Such interactions offer the opportunity to develop consensus on policy, scientific, and technical approaches. Dialogue to address common technical issues helps develop an internationally recognized foundation of sound science, benefiting the U.S. and participating countries. The UNF and HLW management programs in nuclear countries are at different levels of maturity. All countries utilizing nuclear power must store UNF, mostly in wet storage, and HLW for those countries that reprocess UNF. Several countries either utilize or plan to utilize dry storage systems for UNF, perhaps for long periods of time (several decades). Geologic disposal programs are at various different states, ranging from essentially 'no progress' to selected sites and pending license applications to regulators. The table below summarizes the status of UNF and HLW management programs in several countriesa. Thus, the opportunity exists to collaborate at different levels ranging from providing expertise to those countries 'behind' the U.S. to obtaining access to information and expertise from those countries with more mature programs. The U.S. fuel cycle is a once through fuel cycle involving the direct disposal of UNF, as spent nuclear fuel, in a geologic repository (previously identified at Yucca Mountain, Nevada), following at most a few decades of storage (wet and dry). The geology at Yucca Mountain, unsaturated tuff, is unique among all countries investigating the disposal of UNF and HLW. The decision by the U.S. Department of Energy to no longer pursue the disposal of UNF at Yucca Mountain and possibly utilize very long term storage (approaching 100 years or more) while evaluating future fuel cycle alternatives for managing UNF, presents a different UNF and HLW management R&D portfolio that has been pursued in the U.S. In addition, the research and development activities managed by OCRWM have been transferred to DOE-NE. This requires a reconsideration of how the UFDC will engage in cooperative and collaborative activities with other countries. This report presents the UFDC implementation plan for international activities. The DOE Office of Civilian Radioactive Waste Management (OCRWM) has cooperated and collaborated with other countries in many different 'arenas' including the Nuclear Energy Agency (NEA) within the Organization for Economic Co-operation and Development (OECD), the International Atomic Energy Agency (IAEA), and through bilateral agreements with other countries. These international activities benefited OCRWM through the acquisition and exchange of information, database development, and peer reviews by experts from other countries. DOE-NE cooperates and collaborates with other countries in similar 'arenas' with similar objectives and realizing similar benefits. However the DOE-NE focus has not typically been in the area of UNF and HLW management. This report will first summarize these recent cooperative and collaborative activities. The manner that the UFDC will cooperate and collaborate in the future is expected to change as R&D is conducted regarding long-term storage and the potential disposal of UNF and HLW in different geolo

Nutt, W. M. (Nuclear Engineering Division)

2011-06-29T23:59:59.000Z

413

To regulate or not to regulate off-grid electricity access in developing countries  

Science Journals Connector (OSTI)

Abstract As off-grid electrification receives global attention in the Sustainable Energy for All initiative, the role of regulation for this alternative form of electricity delivery requires a careful investigation. This paper asks whether the activity has to be regulated or not. It then tries to find out where regulation can be used and what type of regulation is appropriate. It suggests that for product-type delivery options, there is no justification for regulatory intervention in the sense of utility regulation but such intervention makes sense in the case of mini-grid-based off-grid delivery options. The paper considers the pros and cons of a generic license waiver, a simplified regulatory arrangement and a full-fledged regulatory supervision and suggests that a light-handed approach is appropriate in general to promote the activities of the sub-sector but more formal approaches may be required if the players do not abide by the rules. The paper also highlights some regulatory challenges and issues.

Subhes C. Bhattacharyya

2013-01-01T23:59:59.000Z

414

VFP: Program Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Requirements Program Requirements Home Welcome Researcher! Preparing for Your Visit Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: Complete the entrance survey within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or poster. Abstract for General Audience Complete and submit an abstract summarizing your research experience. Oral or Poster Presentation: Deliver an oral or poster presentation to mentors and peers the final week

415

BER Science Network Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

416

SULI: Program Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Requirements Program Requirements Home Welcome Intern! Preparing for Your Internship Your Arrival Your First Day Weekly Activities Program Requirements Checkout FAQ The DOE WDTS site has comprehensive information on Participant Obligations. Consult that site for more information on all deliverables except the Fermilab Summer Interns website. Attendance: Complete the full ten-week program and attend all scheduled events including lectures, tours and group activities. Entrance Survey: First create an account by following the link, educationLink New Account Setup. After creating the account, you can login to the educationLink site. Complete the entrance survey posted on your EduLink site within your first week at Fermilab. One-page Peer Review Provide a one-page written peer review of another SULI intern' talk or

417

Federal Metering Requirements  

Broader source: Energy.gov (indexed) [DOE]

Metering Requirements Metering Requirements FUPWG - May 23, 2013 Brad Gustafson Federal Energy Management Program 2 42 USC 8253 - ENERGY MANAGEMENT REQUIREMENT (e) Metering By October 1, 2012, in accordance with guidelines established by the Secretary under paragraph (2), all Federal buildings shall, for the purposes of efficient use of energy and reduction in the cost of electricity used in such buildings, be metered. Each agency shall use, to the maximum extent practicable, advanced meters or advanced metering devices that provide data at least daily and that measure at least hourly consumption of electricity in the Federal buildings of the agency. Not later than October 1, 2016, each agency shall provide for equivalent metering of natural gas and steam, in accordance with guidelines established by the Secretary

418

Regulations and Procedures Manual  

E-Print Network [OSTI]

Quality Assurance and Conduct of Operations requirements forquality assurance/conduct of operations performanceassurance and conduct of operations principles. These

Young, Lydia

2014-01-01T23:59:59.000Z

419

Energy Efficiency Requirements for State Government | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Requirements for State Government Energy Efficiency Requirements for State Government Energy Efficiency Requirements for State Government < Back Eligibility Local Government State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Solar Lighting Windows, Doors, & Skylights Heating Water Water Heating Wind Program Info State Connecticut Program Type Energy Standards for Public Buildings Public Act No. 06-187, enacted in 2006, required the Connecticut Office of Policy and Management, in consultation with several other state agencies, to adopt building construction regulations for state facilities. The construction standards must be consistent with or exceed the U.S. Green

420

Hazardous Waste Minimum Distance Requirements (Connecticut) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Minimum Distance Requirements (Connecticut) Minimum Distance Requirements (Connecticut) Hazardous Waste Minimum Distance Requirements (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Department of Energy and Environmental Protection These regulations set minimum distance requirements between certain types of facilities that generate, process, store, and dispose of hazardous waste

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A game of climate chicken : can EPA regulate greenhouse gases before the U.S. Senate ratifies the Kyoto Protocol?  

E-Print Network [OSTI]

EPA's legal authority to regulate greenhouse gas emissions under the Clean Air Act is reviewed. While EPA clearly does not have the authority to implement the precise terms of the Kyoto Protocol, arguments could be put ...

Bugnion, Vronique.; Reiner, David M.

422

14919Federal Register / Vol. 65, No. 54 / Monday, March 20, 2000 / Rules and Regulations commercial fishery during the fishing  

E-Print Network [OSTI]

Assessment/ Regulatory Impact Review was prepared on the proposed changes to the CSP. NMFS has determined that the proposed changes to the CSP and the management measures implementing the CSP contained in these regulations

423

Wyoming State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming Wyoming State Regulations: Wyoming State of Wyoming The Wyoming Oil and Gas Conservation Commission (WOGCC) is the state agency authorized to regulate oil and gas exploration and production waste. The Wyoming Department of Environmental Quality (DEQ) administers general environmental protection regulations. Contact Wyoming Oil and Gas Conservation Commission 2211 King Blvd. Casper, WY 82602 (street address) P.O. Box 2640 Casper, WY 82602 (mailing address) (307) 234-7147 (phone) (307) 234-5306 (fax) Wyoming Department of Environmental Quality 122 West 25th Street, Herscheler Building Cheyenne, WY 82002 (307) 777-7937 (phone) (307) 777-7682 (fax) Disposal Practices and Applicable Regulations Document # 4855, Agency (Oil and Gas Conservation Commission), General Agency, Board or Commission Rules, Chapter 4 (Environmental Rules, Including Underground Injection Control Program Rules for Enhanced Recovery and Disposal Projects), Section 1. Pollution and Surface Damage (Forms 14A and 14B) of the Wyoming Rules and Regulations contains the environmental rules administered by the WOGCC with respect to management options for exploration and production waste.

424

The institutional needs of joint implementation projects  

SciTech Connect (OSTI)

In this paper, the authors discuss options for developing institutions for joint implementation (JI) projects. They focus on the tasks which are unique to JI projects or require additional institutional needs--accepting the project by the host and investor countries and assessing the project`s greenhouse gas (GHG) emission reduction or sequestration--and they suggest the types of institutions that would enhance their performance. The evaluation is based on four sets of governmental and international criteria for JI projects, the experiences of ten pilot JI projects, and the perspectives of seven collaborating authors from China, Egypt, India, Mexico, and Thailand, who interviewed relevant government and non-government staff involved in JI issue assessment in their countries. After examining the roles for potential JI institutions, they present early findings arguing for a decentralized national JI structure, which includes: (1) national governmental panels providing host country acceptance of proposed JI projects; (2) project parties providing the assessment data on the GHG reduction or sequestration for the projects; (3) technical experts calculating these GHG flows; (4) certified verification teams checking the GHG calculations; and (5) members of an international JI Secretariat training and certifying the assessors, as well as resolving challenges to the verifications. 86 refs.

Watt, E.; Sathaye, J. [Lawrence Berkeley Lab., CA (United States); Buen, O. de; Masera, O. [National Univ. of Mexico, Mexico City (Mexico); Gelil, I.A. [Organization of Energy Conservation and Planning, Cairo (Egypt); Ravindranath, N.H. [Indian Inst. of Science, Bangalore (India); Zhou, D.; Li, J. [Energy Research Inst., Beijing (China); Intarapravich, D. [Thailand Environmental Inst., Bangkok (Thailand)

1995-10-21T23:59:59.000Z

425

Michigan State Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Michigan Michigan State Regulations: Michigan State of Michigan The Michigan Department of Environmental Quality (DEQ), through the Supervisor of Wells, Geological and Land Management Division (GLM), oversees the regulation of oil and gas activities. DEQ staff monitors the environmental impacts of well drilling operations, oil and gas production facilities, and gas storage wells. Contact Michigan Department of Environmental Quality Geological and Land Management Division P.O. Box 30256 Lansing, MI 48909-7756 (517) 241-1515 (phone) (517) 241-1601 (fax) (Organization Chart) Disposal Practices and Applicable Regulations The rules governing oil and gas operations are contained in Part 615, Rules 324.101-324.1301 (Department of Environmental Quality, Oil and Gas Operations) of the Michigan Administrative Code.

426

Federal Metering Requirements  

Broader source: Energy.gov [DOE]

Presentationgiven at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meetingcovers the 42 USC 8253 Energy Management Requirement; Executive Order 13514(g) High-Performance Sustainable Federal Buildings; federal metering needs, history, and status; and utility/agency opportunities.

427

Minor in Philosophy Requirements  

E-Print Network [OSTI]

2012-05-23 Minor in Philosophy Requirements: 1. 18 hours of work in philosophy with grades of C- or better. 2. A 2.0 grade point average for all work attempted in philosophy. 3. 9 hours of upper division work in philosophy, with grades of C- or better. 4. Completion of at least one course, with a grade

Stowell, Michael

428

Requirements Definition Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

1997-05-21T23:59:59.000Z

429

Documents Notes Requirements  

E-Print Network [OSTI]

Documents Notes Common Requirements Application Form(typed) with 3 photos attached(3.5 x 4.5cm(including National Intelligence & Security Track), International Trade, International Finance, Korea and East Asia for Application : November 13(Tue), 2012 · Announcement of Documents Screening Results : 2 pm on November 21(Wed

Jang, Ju-Wook

430

Heat Requirements of Buildings  

Science Journals Connector (OSTI)

... and Ventilating Engineers in a publication entitled Recommendations for the Computation of Heat Requirements for Buildings (Pp. iii+41. Is. 9d.) This comprises a section of the ... parts. That on temperature-rise and rates of change gives the recommended values applicable to buildings ranging alphabetically from aircraft sheds to warehouses. The design of heating and ventilating installations ...

1942-02-28T23:59:59.000Z

431

Implementation Guide for DOE Fire Protection and Emergency Services Programs for Use with DOE O 420.1B, Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide facilitates the implementation of requirements of DOE O 420.1B by providing an acceptable approach to meet the requirements for Fire Protection Programs. Cancels DOE G 440.1-5.

2007-09-27T23:59:59.000Z

432

Characterizing, Classifying, and Understanding Information Security Laws and Regulations: Considerations for Policymakers and Organizations Protecting Sensitive Information Assets  

E-Print Network [OSTI]

to any customer. The Safeguards require each of the agenciesseries of regulations pursuant to the Safeguards, which theycall the Safeguards Rule. 143 The OCC, the Federal

Thaw, David Bernard

2011-01-01T23:59:59.000Z

433

Regulated underground storage tanks  

SciTech Connect (OSTI)

This guidance package is designed to assist DOE Field operations by providing thorough guidance on the underground storage tank (UST) regulations. (40 CFR 280). The guidance uses tables, flowcharts, and checklists to provide a roadmap'' for DOE staff who are responsible for supervising UST operations. This package is tailored to address the issues facing DOE facilities. DOE staff should use this guidance as: An overview of the regulations for UST installation and operation; a comprehensive step-by-step guidance for the process of owning and operating an UST, from installation to closure; and a quick, ready-reference guide for any specific topic concerning UST ownership or operation.

Not Available

1992-06-01T23:59:59.000Z

434

Regulated underground storage tanks  

SciTech Connect (OSTI)

This guidance package is designed to assist DOE Field operations by providing thorough guidance on the underground storage tank (UST) regulations. [40 CFR 280]. The guidance uses tables, flowcharts, and checklists to provide a ``roadmap`` for DOE staff who are responsible for supervising UST operations. This package is tailored to address the issues facing DOE facilities. DOE staff should use this guidance as: An overview of the regulations for UST installation and operation; a comprehensive step-by-step guidance for the process of owning and operating an UST, from installation to closure; and a quick, ready-reference guide for any specific topic concerning UST ownership or operation.

Not Available

1992-06-01T23:59:59.000Z

435

Sandia National Laboratories, Livermore Environmental Protection Implementation Plan for the period November 9, 1991--November 9, 1992  

SciTech Connect (OSTI)

Sandia National Laboratories, as part of the DOE complex, is committed to full compliance with all applicable environmental laws and regulations. This Environmental Protection Implementation Plan (EPIP) is intended to ensure that the environmental program objectives of DOE Order 5400.1 are achieved at SNL, Livermore. The EPIP will serve as an aid to management and staff to implement these new programs in a timely manner. 23 refs., 4 figs., 1 tab.

Not Available

1991-10-01T23:59:59.000Z

436

Reassignment of boundaries requiring personal dosimetry at a nuclear facility  

E-Print Network [OSTI]

for monitoring in 10CFR20. In fact, one insurer of nuclear facilities recommends that "occupational exposures, no matter how small, should be monitored and documented for claims evaluation purposes" (ANI 1986). This results from the theory that the nuclear... of Advisory Committee: Dr. John W. Poston Although the federal regulations do not require personnel monitoring for external exposure of all radiation workers, many nuclear facilities provide dosimetry to individuals who do not meet the minimum requirements...

Fulmer, Philip Clark

2012-06-07T23:59:59.000Z

437

Schedule optimization study implementation plan  

SciTech Connect (OSTI)

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

438

Regulated water production to control water coning in oil wells  

E-Print Network [OSTI]

REGULATED WATER PRODUCTION TO CONTROL WATER CONING IN OIL WELLS A Thesis by ISHWAR SINGH Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1975 Major... Subject: Petroleum Engineering REGULATED WATER PRODUCTION TO CONTROL WATER CONING IN OIL WELLS A Thesis by ISHWAR SINGH Approved as to style and content by (Chairman of Committee) (Membe ) (Head of Departmen lVlemb ) May 1975 ( I ABST RACT...

Sim?ha, I?s?vara

1975-01-01T23:59:59.000Z

439

Code of Federal Regulations Occupational Radiation Protection; Final Rule |  

Broader source: Energy.gov (indexed) [DOE]

Code of Federal Regulations Occupational Radiation Protection; Code of Federal Regulations Occupational Radiation Protection; Final Rule Code of Federal Regulations Occupational Radiation Protection; Final Rule The Department of Energy (DOE) is amending its primary standards for occupational radiation protection. This final rule is the culmination of a systematic analysis to identify the elements of a comprehensive radiation protection program and determine those elements of such a program that should be codified as DOE continues its transition from a system of contractually-based nuclear safety standards to regulatory based requirements. Code of Federal Regulations Occupational Radiation Protection; Final Rule More Documents & Publications Code of Federal Regulations PART 835-OCCUPATIONAL RADIATION PROTECTION Order Module--NNSA OCCUPATIONAL RADIATION PROTECTION

440

Department of Energy Finalizes Regulations to Increase Energy Efficiency in  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Finalizes Regulations to Increase Energy Department of Energy Finalizes Regulations to Increase Energy Efficiency in New Federal Buildings by 30% Department of Energy Finalizes Regulations to Increase Energy Efficiency in New Federal Buildings by 30% December 21, 2007 - 4:58pm Addthis WASHINGTON DC - The U.S. Department of Energy (DOE) today announced it has established regulations that require new Federal buildings to achieve at least 30% greater energy efficiency over prevailing building codes. Mandated by the Energy Policy Act of 2005 (EPAct), these standards apply to new federal commercial and multi-family high-rise residential buildings, as well as new federal low-rise residential buildings designed for construction that began on or after January 3, 2007. These standards are also 40% more efficient than the current Code of Federal Regulations (CFR)

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Category:Rules, Regulations & Policies Incentive Types | Open Energy  

Open Energy Info (EERE)

Rules, Regulations & Policies Incentive Types Rules, Regulations & Policies Incentive Types Jump to: navigation, search Rules, Regulations and Policies Types. Pages in category "Rules, Regulations & Policies Incentive Types" The following 15 pages are in this category, out of 15 total. A Appliance/Equipment Efficiency Standards B Building Energy Codes E Energy Efficiency Resource Standard Energy Standards for Public Buildings Equipment Certification Requirements G Green Power Purchasing I Interconnection Standards L Line Extension Analysis M Mandatory Utility Green Power Option N Net Metering P Public Benefit Funds R Renewables Portfolio Standards S Solar and Wind Permitting Standards Solar/Wind Access Policy Solar/Wind Contractor Licensing Retrieved from "http://en.openei.org/w/index.php?title=Category:Rules,_Regulations_%26_Policies_Incentive_Types&oldid=390305

442

Practical implications of marine diesel engine emission regulations  

SciTech Connect (OSTI)

The main pollutants from marine diesel engines are oxides of nitrogen (NOx), sulfur oxides (SOx) and particulates (soot). However, the proposed marine diesel engine emission regulations will primarily focus on the levels of NOx and SOx. In the future, once the proposed regulations are met, the limits and levels of other emissions will come under increasing scrutiny, such as particulates, hydrocarbons and carbon monoxide. Regardless of the type of pollutant, there are generally two classes of emission control: (1) techniques that reduce the amount of pollutant formed in the combustion process, or (2) prevent the pollutants from reaching the atmosphere. Unfortunately, some of these control techniques will not be able to meet the incoming regulations. Therefore, this paper identifies the diesel engine emissions of concern, the impending regulations, and the merits of current and future emission control technologies required to meet these regulations.

Bowen, C.E.; Potter, I.J.; Reader, G.T. [Univ. of Calgary, Alberta (Canada). Dept. of Mechanical Engineering

1996-09-01T23:59:59.000Z

443

Section H: Special Contract Requirements  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DEAR 970.3102-05-6, be fully documented, consistently applied, and acceptable to the Contracting Officer. Costs incurred in implementing the Total Compensation System shall be...

444

Cyber Security Process Requirements Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes the minimum implementation standards for cyber security management processes throughout the Department. No cancellation. Admin Chg 1 dated 9-1-09.

2008-08-12T23:59:59.000Z

445

The new standards HVAC background noise requirements and their implementation in building design  

Science Journals Connector (OSTI)

The new ANSI classroom standard recommends long?term steady?state background sound level limits of 35 dBA and 55 dBC. Since the HVAC system is typically a rooms dominant steady?state noise source it is usually reasonable to apply these limits to the design of the system assuming that other noise sources produce insignificant additions to the rooms long?term background noise environment. The recommended sound level limits are significantly lower than current industry standards and complying with them will increase system costs. School administrators architects and HVAC system designers should therefore be prepared for the changes. This paper summarizes equipment selection and system design guidelines that have been found to be necessary for ensuring compliance with the sound level limits.

2001-01-01T23:59:59.000Z

446

Implementation Guidance, Drug Testing - December 3, 2007 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 December 3, 2007 Implementation guidance for applicants for, and...

447

CRAD, Criticality Safety Controls Implementation - May 31, 2013...  

Office of Environmental Management (EM)

Criticality Safety Controls Implementation - May 31, 2013 CRAD, Criticality Safety Controls Implementation - May 31, 2013 May 31, 2013 Criticality Safety Controls Implementation...

448

NERSC Requirements Workshop November  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Requirements Requirements Workshop November 2009 Lattice gauge theory and some other HE theory Doug Toussaint (University of Arizona) Help from: Paul Mackenzie (Fermilab) Crude comparison of lattice hadron spec- trum to the real world. Lattice Gauge Theory First-principles computations in QCD Also, computations in other strongly coupled field theories * Find hadronic factors to get fundamental physics from experi- ments * Understand structure and interactions of hadrons, maybe even nuclei * Understand QCD: confinement and chiral symmetry breaking * Other strongly interacting theories (what if we don't find the Higgs?) * Quark-gluon matter at high temeratures (RHIC, LHC, early uni- verse) or high densities (neutron stars) HEP theory projects at NERSC now: * Production and analysis of QCD configurations with dynamical quarks, (Doug Toussaint) (MILC collaboration) * Heavy quarks, using

449

Design of Optimal Regulators  

E-Print Network [OSTI]

Current research suggests the use of a liner quadratic performance index for optimal control of regulators in various applications. Some examples include correcting the trajectory of rocket and air vehicles, vibration suppression of flexible structures, and airplane stability. In all these cases, the focus is in suppressing/decreasing system deviations rapidly. However, if one compares the Linear Quadratic Regulator (LQR) solution with optimal solutions (minimum time), it is seen that the LQR solution is less than optimal in some cases indeed (3-6) times that obtained using a minimum time solution. Moreover, the LQR solution is sometimes unacceptable in practice due to the fact that values of control extend beyond admissible limits and thus the designer must choose coefficients in the linear quadratic form, which are unknown. The authors suggest methods which allow finding a quasi-optimal LQR solution with bounded control which is closed to the minimum time solution. They also remand the process of the minimum time decision. Keywords: Optimal regulator, minimum time controller, Linear Quadratic Regulator (LQR). -- This paper is declared a work of the U.S. Government and not subject to copyright protection in the USA. The manuscript is accepted as paper AIAA-2003-6638 by 2nd AIAA Unmanned Unlimited Systems, Technologies, and Operations-Aerospace, Land, and See Conference and Workshop - Exhibit, San Diego, California, USA, 15-18 Sep. 2003.

Alexander Bolonkin; Robert Sierakowski

2007-01-19T23:59:59.000Z

450

Emotion Regulation CONCEPTUAL FOUNDATIONS  

E-Print Network [OSTI]

in emotion and emotion regulation. 3 This is a chapter excerpt from Guilford Publications. Handbook, Hofer, & Vaughan, this volume; Shaver & Mikulincer, this volume), and even in physical illness (Sapolsky with a gossipy clerk counts. So does amusement at a cartoon, anger at economic disparities around the world

Gross, James J.

451

Stakeholder Engagement and Outreach: State Implementation Plans  

Wind Powering America (EERE)

State Implementation Plans State Implementation Plans State Implementation Plans are a policy vehicle that allow states and municipalities to receive emission reduction credit for wind power purchases. Under guidance issued by the U.S. Environmental Protection Agency in August 2004, States and municipalities can receive emission reduction credit in their State Implementation Plans for wind power purchases that reduce air emissions and help achieve attainment of the National Ambient Air Quality Standard for ozone. The National Renewable Energy Laboratory has developed model State Implementation Plan documentation to assist states in achieving this objective. For more information on State Implementation Plans, please see the following publications. Improving Regional Air Quality with Wind Power: Presentation

452

API Requirements for Dynamic Graph Prediction  

SciTech Connect (OSTI)

Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

Gallagher, B; Eliassi-Rad, T

2006-10-13T23:59:59.000Z

453

Requirements for Computer Based-Procedures for Nuclear Power Plant Field Operators Results from a Qualitative Study  

SciTech Connect (OSTI)

Although computer-based procedures (CBPs) have been investigated as a way to enhance operator performance on procedural tasks in the nuclear industry for almost thirty years, they are not currently widely deployed at United States utilities. One of the barriers to the wide scale deployment of CBPs is the lack of operational experience with CBPs that could serve as a sound basis for justifying the use of CBPs for nuclear utilities. Utilities are hesitant to adopt CBPs because of concern over potential costs of implementation, and concern over regulatory approval. Regulators require a sound technical basis for the use of any procedure at the utilities; without operating experience to support the use CBPs, it is difficult to establish such a technical basis. In an effort to begin the process of developing a technical basis for CBPs, researchers at Idaho National Laboratory are partnering with industry to explore CBPs with the objective of defining requirements for CBPs and developing an industry-wide vision and path forward for the use of CBPs. This paper describes the results from a qualitative study aimed at defining requirements for CBPs to be used by field operators and maintenance technicians.

Katya Le Blanc; Johanna Oxstrand

2012-05-01T23:59:59.000Z

454

LEGACY MANAGEMENT REQUIRES INFORMATION  

SciTech Connect (OSTI)

''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

CONNELL, C.W.; HILDEBRAND, R.D.

2006-12-14T23:59:59.000Z

455

BER Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

456

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan  

SciTech Connect (OSTI)

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Burgard, K.G.

1998-09-24T23:59:59.000Z

457

Regulation of Tall Structures (Indiana) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regulation of Tall Structures (Indiana) Regulation of Tall Structures (Indiana) Regulation of Tall Structures (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Wind Buying & Making Electricity Program Info State Indiana Program Type Siting and Permitting Provider Indiana Department of Transporation A permit from the Department of Transportation is required for the construction or alteration of any structure higher than 200 feet above

458

Regulations for Land Disturbing Activities (North Carolina) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Regulations for Land Disturbing Activities (North Carolina) Regulations for Land Disturbing Activities (North Carolina) Regulations for Land Disturbing Activities (North Carolina) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Siting and Permitting The law requires installation and maintenance of sufficient erosion control

459

Used Fuel Disposition Campaign International Activities Implementation Plan  

Broader source: Energy.gov (indexed) [DOE]

International Activities International Activities Implementation Plan Used Fuel Disposition Campaign International Activities Implementation Plan The management of used nuclear fuel and nuclear waste is required for any country using nuclear energy. This includes the storage, transportation, and disposal of low and intermediate level waste (LILW), used nuclear fuel (UNF), and high level waste (HLW). The Used Fuel Disposition Campaign (UFDC), within the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE), Office of Fuel Cycle Technology (FCT), is responsible for conducting research and development pertaining to the management of these materials in the U.S. Cooperation and collaboration with other countries would be beneficial to both the U.S. and other countries through

460

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

BUILDING TECHNOLOGIES PROGRAM Iowa Compliance Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Iowa Iowa Compliance Implementation and Evaluation (CIE) Guide COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 2 This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings. COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 3 Iowa WHAT'S INSIDE CIE Guide Overview-Flow Diagram ........................................................................................................................... 5 PART 1: Guide Overview .................................................................................................................................................

462

INTRODUCTION Requirements to monitor the effects of potentially environ-  

E-Print Network [OSTI]

the boundaries of which major deposits of uranium are subject to current and proposed mining activities. PerhapsINTRODUCTION Requirements to monitor the effects of potentially environ- mentally damaging mining well-regulated mining activity has left a legacy of discharged acidic and metallic wastes to several

Cranston, Peter S.

463

Central Technical Authority Responsibilities Regarding Nuclear Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes Central Technical Authority and Chief of Nuclear Safety/Chief of Defense Nuclear Safety responsibilities and requirements directed by the Secretary of Energy in the development and issuance of Department of Energy regulations and directives that affect nuclear safety. No cancellations.

2007-08-28T23:59:59.000Z

464

Groundwater Cleanup Operational Changes Are Being Implemented...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

is based on EPA National Primary Drinking Water Regulations. The progress of groundwater remediation is reported each year in the SER. Operation metrics indicate that, although...

465

Sandia National Laboratories: implement energy storage projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

implement energy storage projects 2013 Electricity Storage Handbook Published On July 31, 2013, in Energy, Energy Assurance, Energy Storage, Energy Storage Systems, Energy Surety,...

466

Implementation of motion capture support in smartphones.  

E-Print Network [OSTI]

??This thesis investigates the feasibility of developing cross-platform smart phone applications that utilize the Qualisys motion capture system. An Application Programming Interface that implements an (more)

Martinsson, Johannes

2010-01-01T23:59:59.000Z

467

Energy Sector Cybersecurity Framework Implementation Guidance...  

Broader source: Energy.gov (indexed) [DOE]

Cybersecurity Framework Implementation Guidance - Notice of Public Comment: Federal Register Notice, Volume 79, No. 177, September 12, 2014 Energy Sector Cybersecurity Framework...

468

Creating a Climate for Successful Project Implementation  

Broader source: Energy.gov [DOE]

This presentation acknowledges the difficulty implementing identified opportunities for energy efficiency in order to achieve savings and offers strategies to overcome that difficulty.

469

Energy Sector Cybersecurity Framework Implementation Guidance  

Energy Savers [EERE]

JANUARY 2015 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Energy Sector...

470

Departmental Personnel Security - Implementation Guidance | Department...  

Office of Environmental Management (EM)

Overview of Security ClearanceAccess Authorization Process for Applicants Drug Testing Implementation Guidance December 3, 2007 Template for Contractor Company Template for...

471

Implementation of Department of Energy Oversight Policy  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order implements the policy that establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement.

2011-04-25T23:59:59.000Z

472

Building America Expert Meeting: Retrofit Implementation - A...  

Energy Savers [EERE]

projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing...

473

New Mexico Antidegradation Policy Implementation Procedure |...  

Open Energy Info (EERE)

Implementation Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: New Mexico Antidegradation Policy...

474

Criticality Safety Controls Implementation Inspection Criteria...  

Broader source: Energy.gov (indexed) [DOE]

Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls...

475

Plans, Implementation, and Results | Department of Energy  

Office of Environmental Management (EM)

through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management...

476

Preparing for Project Implementation Assigning Accountability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assigning Accountability for Each Project, April 14, 2010 Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010 Assigning Accountability...

477

Energy Management System Implementation ? Do and Check  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

in management systems * DOE pilots in Northwest, Midwest, and California * Online web tools for energy management system implementation Who are we? Dorothy Fisher Atwood WC...

478

Energy Management System Implementation ? First Webinar- Overview  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

W1-1 | Advanced Manufacturing Office eere.energy.gov ADVANCED MANUFACTURING OFFICE Energy Management System Implementation - First Webinar- Overview Deann Desai and Ed Hardison 4...

479

State Energy Program: Kentucky Implementation Model Resources  

Broader source: Energy.gov [DOE]

Below are resources associated with the U.S. Department of Energy's Weatherization and Intergovernmental Programs Office State Energy Program Kentucky Implementation Model.

480

Part B - Requirements & Funding Information PART B - Requirements...  

Office of Environmental Management (EM)

b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Design, development, and analysis of processing elements for VLSI implemented MIMD computer system  

E-Print Network [OSTI]

DESIGN, DEVELOPMENT, AND ANALYSIS OF PROCESSING ELEMENTS FOR VLSI IMPLEMENTED MIMD COMPUTER SYSTEM A Thesis by BRANDON THAYER WALDO Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE May 199'2 Major Subject: Electrical Engineering DESIGN, DEVELOPMENT, AND ANALYSIS OF PROCESSING ELEMENTS FOR VLSI IMPLEMENTED MIMD COMPHTER SYSTEM A Thesis by BRANDON THAYER WALDO Approved as to style and content by...

Waldo, Brandon Thayer

2012-06-07T23:59:59.000Z

482

A hierarchical structure of neural network implemented for the recognition of automobile license plate number  

E-Print Network [OSTI]

A HIERARCHICAL STRUCTURE OF NEURAL NETWORK IMPLEMENTED FOR THE RECOGNITION OF AUTOMOBILE LICENSE PLATE NURSER A Thesis by JOONGHO CHANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfdlment... of the requirements for the degree of MASTER OF SCIENCE August 1994 Major Subject: Electrical Engineering A HIERARCHICAL STRUCTURE OF NEURAL NETWORK IMPLEMENTED FOR THE RECOGNITION OF AUTOMOBILE LICENSE PLATE NUMBER A Thesis by JOONGHO CHANG Submitted...

Chang, Joongho

1994-01-01T23:59:59.000Z

483

Immigration Reform: Policies and Implementation - An Evaluation of American Immigration Policy and Recommended Changes  

E-Print Network [OSTI]

implementation concerns for numerous agencies. The concerns for agencies are pervasive and crosscutting. Areas of Concern ? Technology ? Personnel ? Management ? Funding Bush School of Government Immigration Reform: Policies and Implementation 2... for enforcement efforts. With regard to funding, there were concerns that agencies like DOS and DOL would require additional appropriations to combat any increases in the number of visas since this would lead to influx of applications that would need...

Buck, Caitlin; Cravatt, Cody; Fagin, Paul; Finney, Angela; Gomes, Rafael; Shan, Sandy; Skarboe, Bjorne; Sarmiento Quezada, Brenda; Wagner, Jason

2010-01-01T23:59:59.000Z

484

US weapons-useable plutonium disposition policy: implementation of the MOX fuel option  

E-Print Network [OSTI]

US WEAPONS-USEABLE PLUTONIUM DISPOSITION POLICY: IMPLEMENTATION OF THE MOX FUEL OPTION A Thesis by VANESSA L. GONZALEZ Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements... for the degree of MASTER OF ARTS August 1998 Major Subject: Political Science US WEAPONS-USEABLE PLUTONIUM DISPOSITION POLICY: IMPLEMENTATION OF THE MOX FUEL OPTION A Thesis by VANESSA L. GONZALEZ Submitted to Texas ARM University in partial fulfillment...

Gonzalez, Vanessa L

2012-06-07T23:59:59.000Z

485

Tank waste remediation system privatization infrastructure program, configuration management implementation plan  

SciTech Connect (OSTI)

This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

Schaus, P.S.

1998-08-18T23:59:59.000Z

486

Implementation of an iterative technique for a solution of the Thomas-Fermi equation  

E-Print Network [OSTI]

IMPLEMENTATION OF AN ITERATIVE TECHNIQUE FOR A SOLUTION OF THE THOMAS-FERMI EQUATION A Thesis by RAYMOND CALVERT FLAGG Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree... of MASTER OF SCIENCE August 1978 Major Subject: Mathematics IMPLEMENTATION OF AN ITERATIVE TECHNIQUE FOR A SOLUTION OF THE THOMAS-FERMI EQUATION A Thesis by RAYMOND CALVERT FLAGG Approved as to sryle and content by: (Chairman of Committeeee ( ead...

Flagg, Raymond Calvert

2012-06-07T23:59:59.000Z

487

DOE Takes Steps to Implement the National Broadband Plan | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Takes Steps to Implement the National Broadband Plan Takes Steps to Implement the National Broadband Plan DOE Takes Steps to Implement the National Broadband Plan May 11, 2010 - 12:54pm Addthis The Department of Energy has announced that it is taking steps to implement energy-related recommendations included in the National Broadband Plan, released by the Federal Communications Commission (FCC) in March. The plan included recommendations on a wide range of topics from expanding internet access to modernizing health information to integrating broadband technologies with the Smart Grid. DOE is taking the lead in assessing best practices for providing consumers access to energy data, along with studying the communications requirements of electric utilities to help inform federal Smart Grid policy. As part of the process of implementing these recommendations, the

488

DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required Implementation Proposal for The National Action Plan on Demand Response.

489

Accelerator Facility Safety Implementation Guide for DOE Order (0) 420.2C, Safety of Accelerator Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The revision will address implementation of roles and responsibilities, improve operational efficiency using operating experience, and clarify the use of program requirements such as the Unreviewed Safety Issue and Accelerator Readiness Review.

2013-07-17T23:59:59.000Z

490

Federal Requirements for Water Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Requirements for Water Requirements for Water Efficiency Federal Requirements for Water Efficiency October 7, 2013 - 2:40pm Addthis The following Federal laws and regulations require Federal agencies to reduce water use and improve water efficiency. Also see Water Efficiency Goal Guidance and Guidance for Developing Baseline and Annual Water Use. Executive Order 13423 Executive Order (E.O.) 13423 requires Federal agencies to reduce water consumption intensity (gallons per square foot) 2% annually through the end of fiscal year (FY) 2015 or 16% by the end of FY 2015 from a 2007 baseline. This requirement is to be achieved incrementally by fiscal year beginning in 2008. Fiscal Year Percentage Reduction 2008 2 2009 4 2010 6 2011 8 2012 10 2013 12 2014 14 2015 16 E.O. 13423 Mandated Facility Water Intensity Reductions by Fiscal Year

491

Quantum entanglement in the NMR implementation of the Deutsch-Jozsa algorithm  

E-Print Network [OSTI]

A scheme to execute an n-bit Deutsch-Jozsa (D-J) algorithm using n qubits has been implemented for up to three qubits on an NMR quantum computer. For the one and two bit Deutsch problem, the qubits do not get entangled, hence the NMR implementation is achieved without using spin-spin interactions. It is for the three bit case, that the manipulation of entangled states becomes essential. The interactions through scalar J-couplings in NMR spin systems have been exploited to implement entangling transformations required for the three bit D-J algorithm.

Arvind; Kavita Dorai; Anil Kumar

1999-09-22T23:59:59.000Z

492

Re: NBP RFI-Implementing the National Broadband Plan by Studying the  

Broader source: Energy.gov (indexed) [DOE]

Re: NBP RFI-Implementing the National Broadband Plan by Studying Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy The Telecommunications Industry Association (TIA) is pleased to provide comments on the communications requirements of electric utilities relevant to smart grid policy. TIA appreciates the proactive role the Department of Energy (DOE) is taking in executing the recommendations from the FCC in the National Broadband Plan. Electric utilities and the ICT industry share a long tradition of partnering to build and maintain the communications networks contributing to the security and reliability of the grid.

493

Re: NBP RFI-Implementing the National Broadband Plan by Studying the  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Re: NBP RFI-Implementing the National Broadband Plan by Studying Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy The Telecommunications Industry Association (TIA) is pleased to provide comments on the communications requirements of electric utilities relevant to smart grid policy. TIA appreciates the proactive role the Department of Energy (DOE) is taking in executing the recommendations from the FCC in the National Broadband Plan. Electric utilities and the ICT industry share a long tradition of partnering to build and maintain the communications networks contributing to the security and reliability of the grid.

494

FY 95 engineering work plan for the design reconstitution implementation action plan  

SciTech Connect (OSTI)

Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

Bigbee, J.D.

1994-11-09T23:59:59.000Z

495

Joint energy and reserve markets: Current implementations and modeling trends  

Science Journals Connector (OSTI)

Abstract The continuous penetration of intermittent technologies is gradually reinforcing the technical and economic importance of electricity ancillary services, which are responsible for guaranteeing the reliability and security of the power systems. Generation companies, regulating entities, system operators and other institutions (such as researchers on these fields) are more and more concerned on using market models to forecast most relevant outcomes for particular markets (such as energy and reserves cleared quantities and prices), under different simulation scenarios (such as costs or demand) and under different markets structures (such as more competitive or more oligopolistic). This paper reviews most energy and reserve markets implementations (mainly focusing on reserve types and dispatching methods), and discusses different approaches to model them. A theoretical equilibrium model for energy and reserve markets is also proposed.

Pablo Gonzlez; Jos Villar; Cristian A. Daz; Fco Alberto Campos

2014-01-01T23:59:59.000Z

496

Emotion Regulation JAMES J. GROSS  

E-Print Network [OSTI]

CHAPTER 31 ·Emotion Regulation JAMES J. GROSS Have you ever gotten so angry that you've done), and self-regulation (Mischel, Shoda, & Rodriguez, 1989). What is new are the theoretical and empiri cal

Gross, James J.

497

UCSD Implementing Procedures Effective Date: July 1, 1996 Page 1  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1/Definitions of Terms B. UCSD Implementing Procedures 14/Affirmative Action C. UCSD Implementing Procedures 23/Performance Appraisal D. UC PPSM 30/Salary E. UCSD Implementing Procedures 30/Salary Equity Increase

Tsien, Roger Y.

498

Utility External Disconnect Switch: Practical, Legal, and Technical Reasons to Eliminate the Requirement  

Broader source: Energy.gov [DOE]

This report documents the safe operation of PV systems without a utility external disconnect switch in several large jurisdictions. It includes recommendations for regulators contemplating utility external disconnect switch requirements.

499

Civilian Radioactive Waste Management System Requirements Document  

SciTech Connect (OSTI)

The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.

C.A. Kouts

2006-05-10T23:59:59.000Z

500

Sample variance in photometric redshift calibration: cosmological biases and survey requirements  

Science Journals Connector (OSTI)

......measurements from the Dark Energy Survey could obtain 1sigma...galaxies. Upcoming surveys such as the Dark Energy Survey1 (DES...stringent requirements on dark energy parameter biases, or implements different survey assumptions? The......

Carlos E. Cunha; Dragan Huterer; Michael T. Busha; Risa H. Wechsler

2012-06-11T23:59:59.000Z