Powered by Deep Web Technologies
Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental...

2

Implementation Regulations 3TU MSc Sustainable Energy Technology Delft, 2014-2015 THE IMPLEMENTATION REGULATIONS  

E-Print Network [OSTI]

Implementation Regulations 3TU MSc Sustainable Energy Technology ­ Delft, 2014-2015 THE IMPLEMENTATION REGULATIONS 2014 - 2015 3TU MASTER'S DEGREE PROGRAMME Sustainable Energy Technology - Delft (SET) DELFT UNIVERSITY OF TECHNOLOGY #12;Implementation Regulations MSc Sustainable Energy Technology SET

3

10 CFR 850 Implementation of Requirements  

SciTech Connect (OSTI)

10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPP is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures that ES&H practices across LLNL are developed in a consistent manner. Other implementing documents, such as the ES&H Manual, are integral in effectively implementing 10 CFR 850.

Lee, S

2012-01-05T23:59:59.000Z

4

Council on Environmental Quality - Regulations for Implementing...  

Open Energy Info (EERE)

OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Council on Environmental Quality - Regulations for Implementing the Procedural Provisions of the NEPALegal...

5

Implementation Regulations MSc Chemical Engineering 2013-2014 THE IMPLEMENTATION REGULATIONS  

E-Print Network [OSTI]

.......................................................................................................4 Article 7 ­ The Nuclear Science & Engineering track. The programme comprises the following tracks: - Chemical Product Engineering, - Process Engineering, - NuclearImplementation Regulations MSc Chemical Engineering 2013-2014 THE IMPLEMENTATION REGULATIONS 2013

6

Comments Received on Proposed Rulemaking for regulation implementing...  

Broader source: Energy.gov (indexed) [DOE]

DOE published a Notice of Proposed Rulemaking for regulation implementing section 216(h). Comments on the proposed rule were originally due on January 27, 2012. The comment...

7

Oracle accrual plans from requirements to implementation  

SciTech Connect (OSTI)

Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

Rivera, Christine K [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

8

Cooperating Agencies in Implementing the Procedural Requirements...  

Energy Savers [EERE]

of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that...

9

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide was developed in support of Title 10 Code of Federal Regulations (CFR) Part 830, Nuclear Safety Management. It provides guidance for the requirements defined in 10 CFR §830.205, Technical Safety Requirements.

2014-09-08T23:59:59.000Z

10

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides information to assist in the implementation and interpretation of Title 10 Code of Federal Regulations (CFR) Part 830.203, Unreviewed Safety Question Process, of the Nuclear Safety Management Rules for applicable nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Canceled by DOE N 251.93.

2001-10-24T23:59:59.000Z

11

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides information to assist in implementation of Title 10 Code of Federal Regulations Part 830.203, "Unreviewed Safety Question Process," of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy, including the National Nuclear Security Administration. Cancels DOE G 424.1-1.

2006-07-24T23:59:59.000Z

12

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, “Unreviewed Safety Question Process,” of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Cancels DOE G 424.1-1A. Admin Chg 1 dated 4-12-13.

2010-04-08T23:59:59.000Z

13

Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide, including its attachments, provides information to assist in the implementation of Title 10 Code of Federal Regulations (CFR) Section 830.203, “Unreviewed Safety Question Process,” of the Nuclear Safety Management Rules for Category 1, 2, and 3 nuclear facilities owned or operated by the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA). Cancels DOE G 424.1-1A. Admin Chg 1 dated 4-12-13. Admin Chg 2, dated 6-12-13, cancels DOE G 424.1-1B Admin Chg 1.

2010-04-08T23:59:59.000Z

14

Identifying, Implementing and Complying with Environment, Safety and Health Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Policy sets forth the framework for identifying, implementing and complying with environment, safety and health (ES&H) requirements so that work is performed in the DOE complex in a manner that ensures adequate protection of workers, the public and the environment. Ownership of this policy is shared between GC and HS. Cancels DOE P 450.2. Canceled by DOE P 450.4A.

1996-05-15T23:59:59.000Z

15

Regulations of the Arkansas Plan of Implementation for Air Pollution Control (Arkansas)  

Broader source: Energy.gov [DOE]

The Regulations of the Arkansas Plan of Implementation for Air Pollution Control are applicable to any stationary source that has the potential to emit any federally regulated air pollutant. The...

16

Re: NBP RFI: Communications Requirements- Implementing the National...  

Broader source: Energy.gov (indexed) [DOE]

the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements-...

17

DESIGN AND IMPLEMENTATION OF A FUZZY LOGIC-BASED VOLTAGE CONTROLLER FOR VOLTAGE REGULATION  

E-Print Network [OSTI]

1 DESIGN AND IMPLEMENTATION OF A FUZZY LOGIC-BASED VOLTAGE CONTROLLER FOR VOLTAGE REGULATION In this paper the design and implementation of a fuzzy logic-based controller is described for regulating the output voltage of a synchronous generator. An automated fuzzy logic-based control strategy is presented

LaMeres, Brock J.

18

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Does not cancel other directives.

2010-11-03T23:59:59.000Z

19

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides elaboration for the content of TSRs. Section 10 CFR 830.205 of the Nuclear Safety Management rule, requires Department of Energy (DOE) contractors responsible for category 1, 2, and 3 DOE nuclear facilities to develop Technical Safety Requirements (TSRs). These TSRs identify the limitations to each DOE owned, contractor operated nuclear facility based on the documented safety analysis (DSA) and any additional safety requirements established for the facility. Cancels DOE G 423.1-1.

2010-11-03T23:59:59.000Z

20

Implementation Guide for Use in Developing Technical Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides a complete description of what Technical Safety Requirements should contain and how they should be developed and maintained. This revision of the guide provides new guidance on Technical Safety Requirements for Specific Administrative Controls, incorporates and addresses lessons learned, and makes clarifications and organization changes to improve usability.

2015-03-18T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Negotiated Regulation, Implementation and Compliance in the United States  

E-Print Network [OSTI]

Interest in the use of so-called voluntary approaches to supplement or replace formal environmental regulation is on the rise, both in Europe and in the United States. These approaches fall into two general categories: (1) ...

Ashford, Nicholas

2007-01-01T23:59:59.000Z

22

Re: NBP RFI: Communications Requirements- Implementing the National  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergy 0611__Joint_DOE_GoJ_AMS_Data_v3.pptx More DocumentsCommunications Requirements ofCTIABroadband

23

PROCEDURES FOR ESTABLISHING OR CHANGING IMPLEMENTATION PLANS FOR THE CULTURAL DIVERSITY REQUIREMENT  

E-Print Network [OSTI]

PROCEDURES FOR ESTABLISHING OR CHANGING IMPLEMENTATION PLANS FOR THE CULTURAL DIVERSITY REQUIREMENT with a post baccalaureate program is encouraged, using its own procedures, to evaluate the adequacy of those

Arnold, Jonathan

24

Regulations for Implementing the Procedural Provisions of NEPA | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |RebeccaRegional Standards EnforcementRegulation-1of

25

Implementing NCNP's 21st century geometry capability: requirements, issues, and problems  

SciTech Connect (OSTI)

A new geometry capability has been implemented in MCNP that permits the existence of an unstructured mesh with its legacy Constructive Solid Geometry (CSG) capability to form a hybrid geometry. This new feature enables the user to build complex 3-D models with Computer Aided Engineering (CAE) tools, such as Abaqus, and perform a neutronics analysis on the same geometry mesh that is used for thermo-mechanical analyses. This paper will present an overview of the issues and problems encountered in implementing the requirements for the hybrid geometry capability in MCNP.

Martz, Roger L [Los Alamos National Laboratory; Goorley, John T [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

26

Prediction of Regulation Reserve Requirements in California ISO Control Area based on BAAL Standard  

SciTech Connect (OSTI)

This paper presents new methodologies developed at Pacific Northwest National Laboratory (PNNL) to estimate regulation capacity requirements in the California ISO control area. Two approaches have been developed: (1) an approach based on statistical analysis of actual historical area control error (ACE) and regulation data, and (2) an approach based on balancing authority ACE limit control performance standard. The approaches predict regulation reserve requirements on a day-ahead basis including upward and downward requirements, for each operating hour of a day. California ISO data has been used to test the performance of the proposed algorithms. Results show that software tool allows saving up to 30% on the regulation procurements cost .

Etingov, Pavel V.; Makarov, Yuri V.; Samaan, Nader A.; Ma, Jian; Loutan, Clyde

2013-07-21T23:59:59.000Z

27

24 Academic Regulations/Degree Requirements CATALOG POLICIES  

E-Print Network [OSTI]

in achieving the goals of the institution. Necessary interpretations of these policies will be made. The advisor will counsel, but the final responsibility remains that of the student. A student is required students for information about General Education requirements. The advisor assists the student to develop

Xie,Jiang (Linda)

28

Academic Regulations/Degree Requirements 25 CATALOG POLICIES  

E-Print Network [OSTI]

in achieving the goals of the institution. Necessary interpretations of these policies will be made not yet chosen a major field and may be consulted by other students for information about General. The advisor will counsel, but the final responsibility remains that of the student. A student is required

Xie,Jiang (Linda)

29

Polarization requirements for ensemble implementations of quantum algorithms with a single-bit output  

SciTech Connect (OSTI)

We compare the failure probabilities of ensemble implementations of quantum algorithms which use pseudopure initial states, quantified by their polarization, to those of competing classical probabilistic algorithms. Specifically we consider a class algorithms which require only one bit to output the solution to problems. For large ensemble sizes, we present a general scheme to determine a critical polarization beneath which the quantum algorithm fails with greater probability than its classical competitor. We apply this to the Deutsch-Jozsa algorithm and show that the critical polarization is 86.6%.

Anderson, Brandon M.; Collins, David [Department of Physics, University of Texas at Dallas, P.O. Box 830688, Richardson, Texas 75083 (United States); Department of Physics, Bucknell University, Lewisburg, Pennsylvania 17837 (United States)

2005-10-15T23:59:59.000Z

30

Implementation of ASME Code, Section XI, Code Case N-770, on Alternative Examination Requirements for Class 1 Butt Welds Fabricated with Alloy 82/182  

SciTech Connect (OSTI)

In May 2010, the NRC issued a proposed notice of rulemaking that includes a provision to add a new section to its rules to require licensees to implement ASME Code Case N-770, ‘‘Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without the Application of Listed Mitigation Activities, Section XI, Division 1,’’ with 15 conditions. Code Case N-770 contains baseline and inservice inspection (ISI) requirements for unmitigated butt welds fabricated with Alloy 82/182 material and preservice and ISI requirements for mitigated butt welds. The NRC stated that application of ASME Code Case N-770 is necessary because the inspections currently required by the ASME Code, Section XI, were not written to address stress corrosion cracking Alloy 82/182 butt welds, and the safety consequences of inadequate inspections can be significant. The NRC expects to issue the final rule incorporating this code case into its regulations in the spring 2011 time frame. This paper discusses the new examination requirements, the conditions that NRC is imposing , and the major concerns with implementation of the new Code Case.

Sullivan, Edmund J.; Anderson, Michael T.

2012-09-17T23:59:59.000Z

31

Abstract--ASIC or FPGA implementation of a finite word-length PID controller requires a double expertise: in control  

E-Print Network [OSTI]

Abstract-- ASIC or FPGA implementation of a finite word- length PID controller requires a double of the problem. We show how to design configurable fixed-point PIDs to satisfy applications requiring minimal power consumption, or high control-rate, or both together. As multiply operation is the engine of PID

Paris-Sud XI, Université de

32

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

SciTech Connect (OSTI)

This report is a scoping study that identifies issues associated with developing a national evaluation, measurement and verification (EM&V) standard for end-use, non-transportation, energy efficiency activities. The objectives of this study are to identify the scope of such a standard and define EM&V requirements and issues that will need to be addressed in a standard. To explore these issues, we provide and discuss: (1) a set of definitions applicable to an EM&V standard; (2) a literature review of existing guidelines, standards, and 'initiatives' relating to EM&V standards as well as a review of 'bottom-up' versus 'top-down' evaluation approaches; (3) a summary of EM&V related provisions of two recent federal legislative proposals (Congressman Waxman's and Markey's American Clean Energy and Security Act of 2009 and Senator Bingaman's American Clean Energy Leadership Act of 2009) that include national efficiency resource requirements; (4) an annotated list of issues that that are likely to be central to, and need to be considered when, developing a national EM&V standard; and (5) a discussion of the implications of such issues. There are three primary reasons for developing a national efficiency EM&V standard. First, some policy makers, regulators and practitioners believe that a national standard would streamline EM&V implementation, reduce costs and complexity, and improve comparability of results across jurisdictions; although there are benefits associated with each jurisdiction setting its own EM&V requirements based on their specific portfolio and evaluation budgets and objectives. Secondly, if energy efficiency is determined by the US Environmental Protection Agency to be a Best Available Control Technology (BACT) for avoiding criteria pollutant and/or greenhouse gas emissions, then a standard can be required for documenting the emission reductions resulting from efficiency actions. The third reason for a national EM&V standard is that such a standard is likely to be required as a result of future federal energy legislation that includes end-use energy efficiency, either as a stand-alone energy-efficiency resource standard (EERS) or as part of a clean energy or renewable energy standard. This study is focused primarily on this third reason and thus explores issues associated with a national EM&V standard if energy efficiency is a qualifying resource in federal clean energy legislation. Developing a national EM&V standard is likely to be a lengthy process; this study focuses on the critical first step of identifying the issues that must be addressed in a future standard. Perhaps the most fundamental of these issues is 'how good is good enough?' This has always been the fundamental issue of EM&V for energy efficiency and is a result of the counter-factual nature of efficiency. Counter-factual in that savings are not measured, but estimated to varying degrees of accuracy by comparing energy consumption after a project (program) is implemented with what is assumed to have been the consumption of energy in the absence of the project (program). Therefore, the how good is good enough question is a short version of asking how certain does one have to be of the energy savings estimate that results from EM&V activities and is that level of certainty properly balanced against the amount of effort (resources, time, money) that is utilized to obtain that level of certainty. The implication is that not only should energy efficiency investments be cost-effective, but EM&V investments should consider risk management principles and thus also balance the costs and value of information derived from EM&V (EM&V should also be cost-effective).

Schiller Consulting, Inc.; Schiller, Steven R.; Goldman, Charles A.; Galawish, Elsia

2011-02-04T23:59:59.000Z

33

Implementation plan for Title 40 Code of Federal Regulations Parts 280 and 281; Final rules for underground storage tanks  

SciTech Connect (OSTI)

This report presents the schedules and methods required to comply with the newly promulgated Underground Storage Tank (UST) Regulations Title 40 Code of Federal Regulations (CFR) 280 and 281. These rules were promulgated by the US Environmental Protection Agency (EPA) on September 23, 1988, and became effective December 22, 1988. These regulations are required by Subtitle I of the Resource Conservation and Recovery Act of 1976. Their purpose is to protect the groundwater supplies of the United States in the following ways: Closing old tanks; detecting and remediating tank leaks and spills; establishing stringent standards for new tanks; and upgrade of existing tanks to new-tank standards. 3 refs., 5 tabs.

Stupka, R.C.

1989-04-01T23:59:59.000Z

34

Implementation of EU Waste Recycling Regulation in Macedonia: The Challenges of Policy Integration and Normative Change  

E-Print Network [OSTI]

No. 34. USAID Plastic Recycling Project. Accessed March Recycling Regulation in Macedoniathe Macedonian waste and recycling regulatory framework with

Ilievska Kremer, Jannika Sjostrand

2013-01-01T23:59:59.000Z

35

Implementation Implementation  

E-Print Network [OSTI]

The SLP System: An Implementation of Super Logic Programs 1 The SLP System: An Implementation.09.2002 The SLP System: An Implementation of Super Logic Programs 4 SLP Interpreter (1) Negation Semantics Brass Dagstuhl, 16.09.2002 #12; The SLP System: An Implementation of Super Logic Programs 5 SLP

Brass, Stefan

36

Implementation Implementation  

E-Print Network [OSTI]

The SLP System: An Implementation of Super Logic Programs 1 The SLP System: An Implementation: An Implementation of Super Logic Programs 2 Super Logic Programs (1) #15; Arbitrarily nested propositional: An Implementation of Super Logic Programs 3 Super Logic Programs (2) #15; Default negation can be used only

Brass, Stefan

37

Extracellular Matrix-Regulated Gene Expression RequiresCooperation of SWI/SNF and Transcription Factors  

SciTech Connect (OSTI)

Extracellular cues play crucial roles in the transcriptional regulation of tissue-specific genes, but whether and how these signals lead to chromatin remodeling is not understood and subject to debate. Using chromatin immunoprecipitation (ChIP) assays and mammary-specific genes as models, we show here that extracellular matrix (ECM) molecules and prolactin cooperate to induce histone acetylation and binding of transcription factors and the SWI/SNF complex to the {beta}- and ?-casein promoters. Introduction of a dominant negative Brg1, an ATPase subunit of SWI/SNF complex, significantly reduced both {beta}- and ?-casein expression, suggesting that SWI/SNF-dependent chromatin remodeling is required for transcription of mammary-specific genes. ChIP analyses demonstrated that the ATPase activity of SWI/SNF is necessary for recruitment of RNA transcriptional machinery, but not for binding of transcription factors or for histone acetylation. Coimmunoprecipitation analyses showed that the SWI/SNF complex is associated with STAT5, C/EBP{beta}, and glucocorticoid receptor (GR). Thus, ECM- and prolactin-regulated transcription of the mammary-specific casein genes requires the concerted action of chromatin remodeling enzymes and transcription factors.

Xu, Ren; Spencer, Virginia A.; Bissell, Mina J.

2006-05-25T23:59:59.000Z

38

Implementation Guide for Use in Developing Technical Safety Requirements--Withdrawn  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

As part of the one-year accuracy review of the November 2010 change to the Guide, as required by DOE O 251.1C, Departmental Directives Program, Section 7, additional changes to the Guide were identified by the program offices to make it more complete and effective. Withdrawn 4-10-14.

2013-06-21T23:59:59.000Z

39

AMI Communication Requirements to Implement Demand-Response: Applicability of Hybrid Spread Spectrum Wireless  

SciTech Connect (OSTI)

While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.

Hadley, Mark D.; Clements, Samuel L.; Carroll, Thomas E.

2011-09-30T23:59:59.000Z

40

Developing and Implementing Sustainability Education through the Integration of Behavioral Science Achieving a sustainable future requires that individuals adopt different values,  

E-Print Network [OSTI]

Developing and Implementing Sustainability Education through the Integration of Behavioral Science sustainability education, which can be used to guide the development and evaluation of action Abstract Achieving a sustainable future requires that individuals adopt different values, attitudes, habits

Hall, Sharon J.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

From Requirements to Implementations  

E-Print Network [OSTI]

research project, 1995--1998. ffl Participants Industrial Partners British Aerospace Siemens Snecma -- A French jet­engine manufacturer Tool Vendors I­Logix U.K. SNI -- Siemens Nixdorf Information Systems TNI -- A highly optimizing reconfigurable­ architecture driven compiler (e.g. Trimaran) transforming C

Pnueli, Amir

42

Alternate Fuel Vehicle Recommendations -New and Used Vehicles The University of Central Florida is now required to meet federal regulations  

E-Print Network [OSTI]

Alternate Fuel Vehicle Recommendations - New and Used Vehicles The University of Central Florida is now required to meet federal regulations concerning alternate fuel vehicle purchases is known as a flex fuel vehicle, or a vehicle that is capable of burning ethanol or regular unleaded

Wu, Shin-Tson

43

Regulation of ApoB Secretion by the Low Density Lipoprotein Receptor Requires Exit from the Endoplasmic Reticulum and  

E-Print Network [OSTI]

Regulation of ApoB Secretion by the Low Density Lipoprotein Receptor Requires Exit from the Endoplasmic Reticulum and Interaction with ApoE or ApoB*S Received for publication,December 22, 2007.M710457200 Daniel A. Blasiole1 , Angie T. Oler, and Alan D. Attie2 From the Department of Biochemistry

Attie, Alan D.

44

Implementation guide for use with suspect/counterfeit items: Requirements of DOE O 440.1, worker protection management; 10 CFR 830.120; and DOE 5700.6C, quality assurance  

SciTech Connect (OSTI)

Department of Energy (DOE) Order (O) 440.1, Worker Protection Management For DOE Federal and Contractors Employees, [7] sets forth requirements for DOE and its contractors to implement suspect and counterfeit items (S/CI) controls as part of the quality assurance (QA) programs required by 10 Code of Federal Regulations (CFR) 830.120 [8] or DOE 5700.6C, Quality Assurance [9]. DOE G-830.120, Implementation Guide for Use with 10 CFR Part 830.120, Quality Assurance, [10] provides additional guidance on establishing and implementing effective QA processes to control S/CIs. DOE O 232.1, Occurrence Reporting and Processing of Operations, [11] specifies requirements for reporting S/CIs under the DOE Occurrence Reporting and Processing System (ORPS). DOE promulgated the requirements and guidance to control or eliminate the hazards posed by S/CIs, which can lead to unexpected equipment failures and undue risks to the DOE mission, the environment, and personnel. This Guide is a compendium of information contained in the referenced DOE directives and other documents concerning S/CI controls. It incorporates, updates, and supersedes earlier guidance issued in Plan for the Suspect/Counterfeit Products Issue in the Department of Energy, dated October 1993, [4] and in memoranda issued by Defense Programs (DP) [12-16] and other DOE program offices. This guidance was developed to strengthen the procurement process, identify and eliminate S/CIs, and improve the reporting of S/CIs. The information in this Guide, when implemented by DOE and its contractors, will satisfy the S/CI requirements contained in the referenced DOE directives.

NONE

1997-06-01T23:59:59.000Z

45

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

46

National Energy Efficiency Evaluation, Measurement and Verification (EM&V) Standard: Scoping Study of Issues and Implementation Requirements  

E-Print Network [OSTI]

best practices” when determining savings achieved by energy efficiencyenergy efficiency programs that are implemented by cities, states, utilities, companies, and similar entities. By using best practices

Schiller, Steven R.

2011-01-01T23:59:59.000Z

47

Microdomain calcium oscillations in Drosophila glia regulate seizure susceptibility and require NCKX  

E-Print Network [OSTI]

Glial cells exhibit spontaneous and activity-dependent fluctuations in intracellular Ca˛+, yet it is unclear whether glial Ca˛+ oscillations are required during neuronal signaling. Somatic glial Ca˛+ waves are primarily ...

Melom, Jan E. (Jan Elizabeth)

2013-01-01T23:59:59.000Z

48

Spindle assembly checkpoint robustness requires Tpr-mediated regulation of Mad1/Mad2 proteostasis  

E-Print Network [OSTI]

Tpr is a conserved nuclear pore complex (NPC) protein implicated in the spindle assembly checkpoint (SAC) by an unknown mechanism. Here, we show that Tpr is required for normal SAC response by stabilizing Mad1 and Mad2 ...

Schweizer, Nina

49

Greater-than-Class C low-level radioactive waste transportation regulations and requirements study. National Low-Level Waste Management Program  

SciTech Connect (OSTI)

The purpose of this report is to identify the regulations and requirements for transporting greater-than-Class C (GTCC) low-level radioactive waste (LLW) and to identify planning activities that need to be accomplished in preparation for transporting GTCC LLW. The regulations and requirements for transporting hazardous materials, of which GTCC LLW is included, are complex and include several Federal agencies, state and local governments, and Indian tribes. This report is divided into five sections and three appendices. Section 1 introduces the report. Section 2 identifies and discusses the transportation regulations and requirements. The regulations and requirements are divided into Federal, state, local government, and Indian tribes subsections. This report does not identify the regulations or requirements of specific state, local government, and Indian tribes, since the storage, treatment, and disposal facility locations and transportation routes have not been specifically identified. Section 3 identifies the planning needed to ensure that all transportation activities are in compliance with the regulations and requirements. It is divided into (a) transportation packaging; (b) transportation operations; (c) system safety and risk analysis, (d) route selection; (e) emergency preparedness and response; and (f) safeguards and security. This section does not provide actual planning since the details of the Department of Energy (DOE) GTCC LLW Program have not been finalized, e.g., waste characterization and quantity, storage, treatment and disposal facility locations, and acceptance criteria. Sections 4 and 5 provide conclusions and referenced documents, respectively.

Tyacke, M.; Schmitt, R.

1993-07-01T23:59:59.000Z

50

Both N-and C-lobes of calmodulin are required for Ca2+ regulations of CaV1.2 Ca2+  

E-Print Network [OSTI]

Both N- and C-lobes of calmodulin are required for Ca2+ -dependent regulations of CaV1.2 Ca2 December 2009 Keywords: Ca2+ channel Calmodulin Channel regulation Facilitation Inactivation a b s t r a c t We investigated the concentration- and Ca2+ -dependent effects of CaM mutants, CaM12 and CaM34

Turner, Ray

51

Regulators, Requirements, Statutes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST3 AÇORIANONews

52

Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the U.S. Code of Federal Regulations as codified on December 31, 1993; Revision 1  

SciTech Connect (OSTI)

This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the code of Federal Regulations, Chapter 1, on December 31, 1993. It also includes, in a separate section, any of those requirements that were superseded or discontinued between January 1992 and December 1993. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation. The Office of Information Resources Management staff compiled this listing of reporting and recordkeeping requirements to briefly describe each in a single document primarily to help licensees readily identify the requirements. The compilation is not a substitute for the regulations, and is not intended to impose any new requirements or technical positions. It is part of NRC`s continuing efforts to comply with the Paperwork Reduction Act of 1980 and the Office of Management and Budget regulations that mandate effective and efficient Federal information resources management programs.

Collins, M.; Shelton, B.

1994-07-01T23:59:59.000Z

53

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a requiredImplementation Proposal for The National Action Plan on Demand Response.”  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a requiredImplementation Proposal for The National Action Plan on Demand Response.”

54

Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities  

SciTech Connect (OSTI)

Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

1998-12-31T23:59:59.000Z

55

Modelling the Costs of Electricity Regulation: Evidence of Human Resource Constraints in Developing Countries  

E-Print Network [OSTI]

of companies (due to competition in networks, or probably due to more viable use of incentive regulation). However, more regulated companies also usually imply that the regulator has more licences to deal with, more analyses of companies’ performance... and accounts, and greater effort is likely to be required to implement incentive regulation. In addition, greater regulatory complexity (e.g. arising from regulation of competitive companies using monopoly networks or more interconnected regional franchise...

Domah, Preetum; Pollitt, Michael G.; Stern, Jon

2004-06-16T23:59:59.000Z

56

Student records at The University of Utah are governed by the Family Educational Rights and Privacy Act (FERPA) and its implementing regulations. Under the Act, Directory Information relating to the student is considered to be public information unless th  

E-Print Network [OSTI]

Act (FERPA) and its implementing regulations. Under the Act, Directory Information relating that it be kept confidential. This form serves to process such requests. Directory Information includes of Utah PROHIBIT the release of my directory information except as specified under the Privacy Act. I

Feschotte, Cedric

57

Requirements for Defining Utility Drive Cycles: An Exploratory Analysis of Grid Frequency Regulation Data for Establishing Battery Performance Testing Standards  

SciTech Connect (OSTI)

Battery testing procedures are important for understanding battery performance, including degradation over the life of the battery. Standards are important to provide clear rules and uniformity to an industry. The work described in this report addresses the need for standard battery testing procedures that reflect real-world applications of energy storage systems to provide regulation services to grid operators. This work was motivated by the need to develop Vehicle-to-Grid (V2G) testing procedures, or V2G drive cycles. Likewise, the stationary energy storage community is equally interested in standardized testing protocols that reflect real-world grid applications for providing regulation services. As the first of several steps toward standardizing battery testing cycles, this work focused on a statistical analysis of frequency regulation signals from the Pennsylvania-New Jersey-Maryland Interconnect with the goal to identify patterns in the regulation signal that would be representative of the entire signal as a typical regulation data set. Results from an extensive time-series analysis are discussed, and the results are explained from both the statistical and the battery-testing perspectives. The results then are interpreted in the context of defining a small set of V2G drive cycles for standardization, offering some recommendations for the next steps toward standardizing testing protocols.

Hafen, Ryan P.; Vishwanathan, Vilanyur V.; Subbarao, Krishnappa; Kintner-Meyer, Michael CW

2011-10-19T23:59:59.000Z

58

Implementation Guide for Use with 10 CFR Part 851, Worker Safety and Health Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides supplemental information and describes implementation practices to assist contractors in effectively developing, managing and implementing worker safety and health programs required by 10 Code of Federal Regulations, Part 851, Worker Safety and Health Program. Canceled by DOE G 440.1-1B.

2006-12-27T23:59:59.000Z

59

Forest Road Building Regulations  

Broader source: Energy.gov [DOE]

The Wisconsin Department of Natural Resources has regulations for building a forest road, if development requires one. Regulations include zoning ordinances and permits for stream crossing, grading...

60

Title 43 CFR 46 Implementation of the National Environmental...  

Open Energy Info (EERE)

Regulation: Title 43 CFR 46 Implementation of the National Environmental Policy Act of 1969Legal Abstract Part 1502 - Implementation of the National Environmental...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Title 10 CFR 1021 National Environmental Policy Act Implementing...  

Open Energy Info (EERE)

1 National Environmental Policy Act Implementing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation:...

62

Hazardous Waste Minimum Distance Requirements (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations set minimum distance requirements between certain types of facilities that generate, process, store, and dispose of hazardous waste and other land uses. The regulations require an...

63

Pressure Safety Program Implementation at ORNL  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According to 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNL’s Pressure Safety Program.

Lower, Mark [ORNL; Etheridge, Tom [ORNL; Oland, C. Barry [XCEL Engineering, Inc.

2013-01-01T23:59:59.000Z

64

Water Quality Standards Implementation (Oklahoma)  

Broader source: Energy.gov [DOE]

The Oklahoma Department of Environmental Quality regulates Oklahoma's Water Quality Standards. The law states the requirements and standards for point source discharges. It also establishes...

65

Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs.

Latham, A.R.; Evans, R.B.

1991-11-01T23:59:59.000Z

66

Unreviewed Safety Question Requirements  

Broader source: Energy.gov (indexed) [DOE]

Unreviewed Safety Question Requirements FUNCTIONAL AREA GOAL: A fully compliant Unreviewed Safety Question (USQ) program is implemented and maintained across the site....

67

Transition Implementation Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

2001-04-24T23:59:59.000Z

68

Regulations For Gas Companies (Tennessee)  

Broader source: Energy.gov [DOE]

The Regulations for Gas Companies, implemented by the Tennessee Regulatory Authority (Authority) outline the standards for metering, distribution and electricity generation for utilities using gas....

69

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

70

Integrated Management Requirements mapping  

SciTech Connect (OSTI)

This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

Holmes, J.T.; Andrews, N.S.

1992-06-01T23:59:59.000Z

71

General Responsibilities and Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

1999-07-09T23:59:59.000Z

72

Library Regulations Library Regulations  

E-Print Network [OSTI]

Library Regulations 2012-13 Library Regulations UNIVERSITY OF BIRMINGHAM REGULATIONS LIBRARY REGULATIONS Preamble: The Library Regulations apply to all users of library facilities managed on behalf of the University by Library Services, and thus there are sections that apply also to non- members of the University

Birmingham, University of

73

Improving CS regulations.  

SciTech Connect (OSTI)

President Carter issued Executive Order 12044 (3/28/78) that required all Federal agencies to distinguish between significant and insignificant regulations, and to determine whether a regulation will result in major impacts. This study gathered information on the impact of the order and the guidelines on the Office of Conservation and Solar Energy (CS) regulatory practices, investigated problems encountered by the CS staff when implementing the order and guidelines, and recommended solutions to resolve these problems. Major tasks accomplished and discussed are: (1) legislation, Executive Orders, and DOE Memoranda concerning Federal administrative procedures relevant to the development and analysis of regulations within CS reviewed; (2) relevant DOE Orders and Memoranda analyzed and key DOE and CS staff interviewed in order to accurately describe the current CS regulatory process; (3) DOE staff from the Office of the General Counsel, the Office of Policy and Evaluation, the Office of the Environment, and the Office of the Secretary interviewed to explore issues and problems encountered with current CS regulatory practices; (4) the regulatory processes at five other Federal agencies reviewed in order to see how other agencies have approached the regulatory process, dealt with specific regulatory problems, and responded to the Executive Order; and (5) based on the results of the preceding four tasks, recommendations for potential solutions to the CS regulatory problems developed. (MCW)

Nesse, R.J.; Scheer, R.M.; Marasco, A.L.; Furey, R.

1980-10-01T23:59:59.000Z

74

Estradiol-Induced Object Memory Consolidation in Middle-Aged Female Mice Requires Dorsal Hippocampal Extracellular Signal-Regulated Kinase and Phosphatidylinositol 3-Kinase Activation  

E-Print Network [OSTI]

We previously demonstrated that dorsal hippocampal extracellular signal-regulated kinase (ERK) activation is necessary for 17?[beta]-estradiol (E2[E subscript 2]) to enhance novel object recognition in young ovariectomized ...

Lewis, Michael C.

75

Tidal Wetlands Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

Most activities occurring in or near tidal wetlands are regulated, and this section contains information on such activities and required permit applications for proposed activities. Applications...

76

ISO 14001 IMPLEMENTATION AT A NATIONAL LABORATORY.  

SciTech Connect (OSTI)

After a tumultuous year discovering serious lapses in environment, safety and health management at Brookhaven National Laboratory, the Department of Energy established a new management contract. It called for implementation of an IS0 14001 Environmental Management System and registration of key facilities. Brookhaven Science Associates, the managing contractor for the Laboratory, designed and developed a three-year project to change culture and achieve the goals of the contract. The focus of its efforts were to use IS0 14001 to integrate environmental stewardship into all facets of the Laboratory's mission, and manage its programs in a manner that protected the ecosystem and public health. A large multidisciplinary National Laboratory with over 3,000 employees and 4,000 visiting scientists annually posed significant challenges for IS0 14001 implementation. Activities with environmental impacts varied from regulated industrial waste generation, to soil activation from particle accelerator operations, to radioactive groundwater contamination from research reactors. A project management approach was taken to ensure project completion on schedule and within budget. The major work units for the Environmental Management System Project were as follows: Institutional EMS Program Requirements, Communications, Training, Laboratory-wide Implementation, and Program Assessments. To minimize costs and incorporate lessons learned before full-scale deployment throughout the Laboratory, a pilot process was employed at three facilities. Brookhaven National Laboratory has completed its second year of the project in the summer of 2000, successfully registering nine facilities and self-declaring conformance in all remaining facilities. Project controls, including tracking and reporting progress against a model, have been critical to the successful implementation. Costs summaries are lower than initial estimates, but as expected legal requirements, training, and assessments are key cost centers. Successes to date include the pilot process, heightened employee awareness, registration of the first DOE National Laboratory facility, line ownership of the program, and senior management commitment.

BRIGGS,S.L.K.

2001-06-01T23:59:59.000Z

77

Aquifer Protection Area Land Use Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

These regulations describe allowable activities within aquifer protection areas, the procedure by which such areas are delineated, and relevant permit requirements. The regulations also describe...

78

Title 32 CFR 775 Procedures for Implementing the National Environmenta...  

Open Energy Info (EERE)

775 Procedures for Implementing the National Environmental Policy Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal...

79

DOE Nevada Operations Office Environmental Protection Implementation Plan, November 9, 1993--November 9, 1994  

SciTech Connect (OSTI)

DOE Order 5400.1, ``General Environmental Protection Program,`` established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter III of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Nevada Operations Office (DOE/NV) has prepared this fourth annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Environment, Safety, Security, & Health (AMESSH), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions.

Elle, D.R. [USDOE Nevada Operations Office, Las Vegas, NV (United States); Townsend, Y.E. [ed.; Latham, A.R.; Black, S.C. [Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States)

1993-11-01T23:59:59.000Z

80

Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

The Uranium Mill Tallings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1 (Chapter 3, paragraph 2). The UMTRA EPIP covers the time period of November 9, 1992, through November 8, 1993. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

Not Available

1992-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Uranium Mill Tailings Remedial Action Project environmental protection implementation plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

Not Available

1994-10-01T23:59:59.000Z

82

NISTIR 7933 Requirements and  

E-Print Network [OSTI]

NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type 18 #12;ii NISTIR 7933 Requirements and Conformance Test Assertions for ANSI/NIST-ITL 1-2011 Record Type/CTS designed to test implementations of ANSI/NIST-ITL 1- 2011 (AN-2011) "Data Format for the Interchange

83

Surface Coal Mining Regulations (Mississippi)  

Broader source: Energy.gov [DOE]

The Surface Coal Mining Regulations are a combination of permitting requirements and environmental regulations that limit how, where and when coal can be mined. It protects lands that are under...

84

Underground Storage Tank Regulations  

Broader source: Energy.gov [DOE]

The Underground Storage Tank Regulations is relevant to all energy projects that will require the use and building of pipelines, underground storage of any sorts, and/or electrical equipment. The...

85

Nebraska Hazardous Waste Regulations (Nebraska)  

Broader source: Energy.gov [DOE]

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to hazardous waste management, waste standards, permitting requirements, and land disposal...

86

Rules and Regulations for Hazardous Waste Management (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations establish permitting and operational requirements for hazardous waste facilities. They are designed to minimize...

87

CERTIFICATION REQUIREMENTS IN THE CALIFORNIA ENERGY COMMISSION'S  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION CERTIFICATION REQUIREMENTS IN THE CALIFORNIA ENERGY COMMISSION'S APPLIANCE REGULATIONS: A Summary Guide, Including Forms for Manufacturers, Trade Associations, and Other ...............................................................................................................1 III. Where to Find the Energy Commission Appliance Efficiency Regulations .....2 IV. Where to Get

88

Antidegredation Implementation Methods (Mississippi)  

Broader source: Energy.gov [DOE]

This environmental regulation is an addition to the Water Quality Criteria for Intrastate, Interstate, and Coastal Water regulations. It separates Mississippi's water into 3 tiers. Tier 1 waters...

89

Frequency Control Performance Measurement and Requirements  

E-Print Network [OSTI]

changes in dispatch to follow load, implement interchangerequired for load frequency regulation, it follows that afollows [4]: “System frequency deviation and the resulting time error indicated the total imbalance of generation and load

Illian, Howard F.

2011-01-01T23:59:59.000Z

90

The Mechanized Verification of Garbage Collector Implementations  

E-Print Network [OSTI]

Abstract The Mechanized Verification of Garbage Collector Implementations Andrew Evan Mc complex, requiring a garbage collector. Garbage collectors are becoming increasingly sophis- ticated to adapt them to high-performance, concurrent and real-time applications, making internal collector

91

EO 13211: Regulations That Significantly Affect Energy Supply...  

Energy Savers [EERE]

1: Regulations That Significantly Affect Energy Supply, Distribution, or Use EO 13211: Regulations That Significantly Affect Energy Supply, Distribution, or Use I am requiring that...

92

Incremental Implementation of Energy Management at Industrial Facilities  

E-Print Network [OSTI]

management practice by implementing the management system standard, most are intimidated by the perceived complexity and sweeping authority of the standard and elect not to pursue formal implementation. While the standard does require coordinated...

Brown, M.; Key, G.

2005-01-01T23:59:59.000Z

93

Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules, regulations and orders relating to nuclear safety (DOE Nuclear Safety Requirements).

94

Implementation of Title V in California  

SciTech Connect (OSTI)

This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

Werner, B.; Cook, B.

1996-12-31T23:59:59.000Z

95

Y-12 Site environmental protection program implementation plan (EPPIP)  

SciTech Connect (OSTI)

The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

NONE

1996-11-01T23:59:59.000Z

96

Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

Vollmer, A.T.

1993-10-01T23:59:59.000Z

97

Data quality objective for regulatory requirements for dangerous waste sampling and analysis  

SciTech Connect (OSTI)

Contains requirements for sampling and analysis to meet the dangerous (hazardous) waste regulations.

Mulkey, C.H., Westinghouse Hanford

1996-07-02T23:59:59.000Z

98

Re: Implementing the National Broadband Plan by Studying the...  

Broader source: Energy.gov (indexed) [DOE]

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: Implementing the National Broadband Plan by Studying the Communications...

99

Implementation Guidance for the DOE Policy on Documentation and...  

Broader source: Energy.gov (indexed) [DOE]

To further transparency and openness in its implementation of the National Environmental Policy Act (NEPA), the Department of Energy (DOE) has established a policy requiring each...

100

ORISE: Policy Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Implementing AccountableCare  

E-Print Network [OSTI]

Implementing AccountableCare Organizations POLICYBRIEF MAY2010 ADVANCING NATIONAL HEALTH REFORMPolicyandClinicalPractice #12;i Berkeley Center on Health, Economic & Family Security|Implementing Accountable Care to implement the newly-minted comprehensive healthcare reform law, the Patient Protection and Affordable Care

Kammen, Daniel M.

102

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

103

Is Conservation a Legitimate Goal of Regulation?  

E-Print Network [OSTI]

Conservation of energy is a frequently cited goal of utility rate regulation. Implementing this goal through modification of consumer behavior has been achieved with varying degrees of success through rate design, incentive programs, direct load...

Goble, G. L.

1984-01-01T23:59:59.000Z

104

Experiment and Simulation of Dynamic Voltage Regulation in Multiple Distributed Energy Resources Systems  

SciTech Connect (OSTI)

Distributed energy (DE) resources are power sources located near load centers and equipped with power electronics converters to interface with the grid, therefore it is feasible for DE to provide reactive power (along with active power) locally for dynamic voltage regulation. In this paper, a synchronous condenser and a microturbine with an inverter interface are implemented in parallel in a distribution system to regulate the local voltage. Developed voltage control schemes for the inverter and the synchronous condenser are presented. Experimental results show that both the inverter and the synchronous condenser can regulate the local voltage instantaneously although the dynamic response of the inverter is much faster than the synchronous condenser. In a system with multiple DEs performing local voltage regulation, the interaction between the DEs is studied. The simulation results show the relationship between the voltages in the system and the reactive power required for the voltage regulation. Also, integrated voltage regulation (multiple DEs performing voltage regulation) can increase the voltage regulation capability of DEs and reduce the capital and operating costs.

Xu, Yan [ORNL; Li, Fangxing [ORNL; Kueck, John D [ORNL; Rizy, D Tom [ORNL

2007-01-01T23:59:59.000Z

105

Kansas Air Quality Regulations (Kansas)  

Broader source: Energy.gov [DOE]

All new air contaminant emission sources or alterations to emission sources that are required to be reported shall be in compliance with all applicable emission control regulations at the time that...

106

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

107

Water Pollution Control Permit Regulations (Vermont)  

Broader source: Energy.gov [DOE]

These regulations outline the permits and permitting processes for point discharges to surface waters and outline the monitoring and reporting requirements.

108

Rhode Island Pretreatment Regulations (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations set standards for water pretreatment prior to release to Publicly Owned Treatment Works (POTWs), and require effluent data including the identity, amount, frequency, concentration...

109

Gas and Electric Utilities Regulation (South Dakota)  

Broader source: Energy.gov [DOE]

This legislation contains provisions for gas and electric utilities. As part of these regulations, electric utilities are required to file with the Public Utilities Commission a document regarding...

110

State Waste Discharge Permit ST-4502 Implementation Plan  

SciTech Connect (OSTI)

Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

BROWN, M.J.; LECLAIR, M.D.

2000-09-27T23:59:59.000Z

111

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

QA Program, the applicable QA requirements, and the responsibility for the implementationQA capability as determined by evaluation of the facilities and implementation of the QA program.QA personnel and having line authority for the implementation of the QA program.

Albert editor, R.

2009-01-01T23:59:59.000Z

112

Maintenance Implementation Plan for B Plant. Revision 1  

SciTech Connect (OSTI)

The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ``Nuclear Facilities`` (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation.

Tritt, S.E.

1993-04-01T23:59:59.000Z

113

Incentive regulation of investor-owned nuclear power plants by public utility regulators. Revision 1  

SciTech Connect (OSTI)

The US Nuclear Regulatory Commission (NRC) periodically surveys the Federal Energy Regulatory Commission (FERC) and state regulatory commissions that regulate utility owners of nuclear power plants. The NRC is interested in identifying states that have established economic or performance incentive programs applicable to nuclear power plants, how the programs are being implemented, and in determining the financial impact of the programs on the utilities. The NRC interest stems from the fact that such programs have the potential to adversely affect the safety of nuclear power plants. The current report is an update of NUREG/CR-5975, Incentive Regulation of Investor-Owned Nuclear Power Plants by Public Utility Regulators, published in January 1993. The information in this report was obtained from interviews conducted with each state regulatory agency that administers an incentive program and each utility that owns at least 10% of an affected nuclear power plant. The agreements, orders, and settlements that form the basis for each incentive program were reviewed as required. The interviews and supporting documentation form the basis for the individual state reports describing the structure and financial impact of each incentive program.

McKinney, M.D.; Seely, H.E.; Merritt, C.R.; Baker, D.C. [Pacific Northwest Lab., Richland, WA (United States)

1995-04-01T23:59:59.000Z

114

Cogeneration and its regulations  

SciTech Connect (OSTI)

In the near term, regulators, utility managements, and legislators will grapple with numerous issues surrounding the development of cogeneration projects as sources of electric power. The Federal Energy Regulatory Commission predicts that 12,000 MW of new cogeneration plants will be constructed during the 1980s, and all 50 states are in the process of implementing new regulations pursuant to the Public Utility Regulatory Policies Act. The US utility system's overall fuel efficiency of 29% offers rich opportunities to conserve fuel, reduce costs, and decrease pollution via cogeneration. Policymakers should stop viewing utilities simply as efficiency tax collectors on the one hand and opponents of innovation on the other. In addition to mothballing inefficient central utility stations, the US must rapidly deploy district heating with cogenerated heat; policymakers should look beyond the obsolete stream systems and encourage development of the high-temperature hot-water systems so successful in Europe.

Casten, T.R.; Ross, H.E.

1981-03-26T23:59:59.000Z

115

NOTICE OF PROPOSED EMERGENCY REGULATIONS TO PROVIDE AN INTERIM VARIANCE FOR UNDERGROUND STORAGE TANK SYSTEMS STORING CERTAIN BIODIESEL BLENDS FROM THIRD-PARTY MATERIAL COMPATIBILITY TESTING AND APPROVAL REQUIREMENTS  

E-Print Network [OSTI]

(Enclosure A). The regulations and the Finding of Emergency (Enclosure B) will be included in the rulemaking package that is sent to the Office of Administrative Law for review. If you have any questions about this matter, please contact Lori Senitte Brock at (916) 341-5185.

Arnold Schwarzenegger

2009-01-01T23:59:59.000Z

116

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

117

page 1 of 4 Implementation of Document Control Requirements  

E-Print Network [OSTI]

and international standards ISO 9001:2008 and ISO 14001:2004. These documents may be of internal or external origin

Kemner, Ken

118

Cooperating Agencies in Implementing the Procedural Requirements of the  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergyDistrict EnergyCensus, Survey, and|National

119

Reporting Cooperating Agencies in Implementing the Procedural Requirements  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReply Comments of SouthernJune 6,DepartmentEnergyof

120

Implementation Guide for Developing Technical Safety Requirements (Informational Purposes Only)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This draft has been scheduled for final review before the Directives Review Board on 2/19/2015. All major comments and concerns should be provided to your DRB representative by 2/17/2015, following your organization process. If you do not know who your representative is, please see the list of DRB members. If your office is represented by Ingrid Kolb, Director, Office of Management, please submit your major concerns and comments to the DRB Liaison, Camille Beben (Camille.Beben@hq.doe.gov; 202-586-1014).

2015-02-10T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Implementation of DOE NPH Requirements at the Thomas Jefferson National  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel CellandVehicles &StandardsEnergy1 U.S.July 2011

122

Alternative Regulation (Vermont)  

Broader source: Energy.gov [DOE]

Utility regulators, including the Public Service Board, have applied a new type of regulation, often called "alternative regulation" or "incentive regulation." There are many variants of this type...

123

Government Regulation  

E-Print Network [OSTI]

Abstract. Interest in the use of so-called voluntary approaches to supplement or replace formal environmental regulation is on the rise, both in Europe and in the United States. These approaches fall into two general ...

Ashford, Nicholas

2005-01-01T23:59:59.000Z

124

A User Driven Dynamic Circuit Network Implementation  

SciTech Connect (OSTI)

The requirements for network predictability are becoming increasingly critical to the DoE science community where resources are widely distributed and collaborations are world-wide. To accommodate these emerging requirements, the Energy Sciences Network has established a Science Data Network to provide user driven guaranteed bandwidth allocations. In this paper we outline the design, implementation, and secure coordinated use of such a network, as well as some lessons learned.

Guok, Chin; Robertson, David; Chaniotakis, Evangelos; Thompson, Mary; Johnston, William; Tierney, Brian

2008-10-01T23:59:59.000Z

125

Application of Nuclear Regulatory Commission Regulation Equivalency to Construction of New Nuclear Facilities  

SciTech Connect (OSTI)

The Spent Nuclear Fuels Project (SNFP) Office of the Department of Energy (DOE), Richland Operations Office, is charged with moving 2.100 metric tons of spent nuclear fuel elements left over from plutonium production into semi-permanent storage at DOE'S Hanford site in Washington state. In anticipation of eventual NRC regulation, the DOE decided to impose NRC requirements on new SNFP facility design and construction, specifically for the Cold Vacuum Drying Facility (CVDF) and the Canister Storage Building (CSB). The SNFP implemented this policy of ''NRC equivalency'' with the goal of achieving a level of nuclear safety equivalent to that of NRC-licensed fuel processing facilities. Appropriate features of the NRC licensing process were adopted. However, the SNFP maintained applicable DOE requirements in tandem with the NRC regulations. Project work is continuing, with the first fuel movement scheduled for November, 2000.

BISHOP, G.E.

1999-06-02T23:59:59.000Z

126

SPATIAL DATA MINING IMPLEMENTATION Alternatives and perfermances  

E-Print Network [OSTI]

SPATIAL DATA MINING IMPLEMENTATION Alternatives and perfermances NADJIM CHELGHOUM, KARINE ZEITOUNI Abstract: Spatial data mining requires the analysis of the interactions in space. These interactions can be materialized using distance tables, reducing spatial data mining to multi-table analysis. However, conventional

Zeitouni, Karine

127

Energy Efficiency Requirements for State Government  

Broader source: Energy.gov [DOE]

Public Act No. 06-187, enacted in 2006, required the Connecticut Office of Policy and Management, in consultation with several other state agencies, to adopt building construction regulations for...

128

Siting Requirements for Anaerobic Lagoons (Iowa)  

Broader source: Energy.gov [DOE]

This statute provides regulations for required distances between anaerobic lagoons and residences or public use areas. The separation distances may be waived or reduced with the agreement of the...

129

Solid Waste Regulation No. 8- Solid Waste Composting Facilities (Rhode Island)  

Broader source: Energy.gov [DOE]

Facilities which compost putrescible waste and/or leaf and yard waste are subject to these regulations. The regulations establish permitting, registration, and operational requirements for...

130

Division of Water, Part 675: Great Lakes Water Withdrawal Registration Regulations (New York)  

Broader source: Energy.gov [DOE]

These regulations set forth requirements for the registration of water withdrawals and reporting of water losses from the Great Lakes Basin. The regulations apply to water withdrawals from...

131

Grand Gulf-prioritization of regulatory requirements  

SciTech Connect (OSTI)

As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit.

Meisner, M.J. (Entergy Operations Inc., Port Gibson, MS (United States))

1993-01-01T23:59:59.000Z

132

IMPLEMENTATION OF DEPARTMENT OF ENERGY ACQUISITION REGULATION (DEAR)  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4InFinding Investigationof MEMORANDUM FORRecipient

133

Council on Environmental Quality - Regulations for Implementing the  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) |Cordova Electric633211°,of Forest Health Projects

134

Comments Received on Proposed Rulemaking for regulation implementing  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartment of4CenterPointChristinaClayCoalof Energy Hussmannofsection

135

CEQ Regulations for Implementing the Procedural Provisions of NEPA  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 <Ones | DepartmentCEE WinterCouncil on

136

SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictions onSBBiodieselHeadline|Department of Energy

137

Compliance with the Clean Air Act Title VI Stratospheric Ozone Protection Program requirements at U.S. DOE Oak Ridge Reservation Facilities  

SciTech Connect (OSTI)

The Title VI Stratospheric Ozone Protection Program of the Clean Air Act (CAA) requires promulgation of regulations to reduce and prevent damage to the earth's protective ozone layer. Regulations pursuant to Title VI of the CAA are promulgated in the Code of Federal Regulations (CFR) at Title 40 CFR, Part 822. The regulations include ambitious production phaseout schedules for ozone depleting substances (ODS) including chlorofluorocarbons (CFCs), hydrochlorofluorocarbons (HCFCs), halons, carbon tetrachloride, and methyl chloroform under 40 CFR 82, Subpart A. The regulations also include requirements for recycling and emissions reduction during the servicing of refrigeration equipment and technician certification requirements under Subpart F; provisions for servicing of motor vehicle air conditioners under Subpart B; a ban on nonessential products containing Class 1 ODS under Subpart C; restrictions on Federal procurement of ODS under Subpart D; labeling of products using ODS under Subpart E; and the Significant New Alternatives Policy Program under Subpart G. This paper will provide details of initiatives undertaken at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title VI Stratospheric Ozone Protection Program. The Stratospheric Ozone Protection Plans include internal DOE requirements for: (1) maintenance of ODS inventories; (2) ODS procurement practices; (3) servicing of refrigeration and air conditioning equipment; (4) required equipment modifications or replacement; (5) technician certification training; (6) labeling of products containing ODS; (7) substitution of chlorinated solvents; and (8) replacement of halon fire protection systems. The plans also require establishment of administrative control systems which assure that compliance is achieved and maintained as the regulations continue to develop and become effective.

Humphreys, M.P.; Atkins, E.M.

1999-07-01T23:59:59.000Z

138

Regulation 28: Library REGULATION 28: LIBRARY  

E-Print Network [OSTI]

Regulation 28: Library 180 REGULATION 28: LIBRARY The purpose of this Regulation is to safeguard the common interests of all Library users. All persons are admitted on the understanding that they have read and agreed to observe the Library Regulations. Breach of this Regulation could result in membership being

Sussex, University of

139

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

140

Incentive Regulation of Electricity Distribution Networks: Lessons of Experience from Britain  

E-Print Network [OSTI]

This paper reviews the recent experience of the UK electricity distribution sector under incentive regulation. The UK has a significant and transparent history in implementing incentive regulation in the period since 1990. We demonstrate...

Jamasb, Tooraj; Pollitt, Michael G.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Dynamic Voltage Regulation Using Distributed Energy Resources  

SciTech Connect (OSTI)

Many distributed energy resources (DE) are near load centres and equipped with power electronics converters to interface with the grid, therefore it is feasible for DE to provide ancillary services such as voltage regulation, nonactive power compensation, and power factor correction. A synchronous condenser and a microturbine with an inverter interface are implemented in parallel in a distribution system to regulate the local voltage. Voltage control schemes of the inverter and the synchronous condenser are developed. The experimental results show that both the inverter and the synchronous condenser can regulate the local voltage instantaneously, while the dynamic response of the inverter is faster than the synchronous condenser; and that integrated voltage regulation (multiple DE perform voltage regulation) can increase the voltage regulation capability, increase the lifetime of the equipment, and reduce the capital and operation costs.

Xu, Yan [ORNL; Rizy, D Tom [ORNL; Li, Fangxing [ORNL; Kueck, John D [ORNL

2007-01-01T23:59:59.000Z

142

UNSATURATED SOIL MECHANICS IMPLEMENTATION  

E-Print Network [OSTI]

UNSATURATED SOIL MECHANICS IMPLEMENTATION DURING PAVEMENT CONSTRUCTION QUALITY ASSURANCE Mn !! Performance Based Construction QA !! Unsaturated Soil Mechanics !! What We've Learned !! Next Steps #12.6-6.0 5 - 7 19 0.8 5 7 - 9 24 1.1 4 9 - 11 28 1.2 4 #12;Unsaturated Soil Mechanics #12;Fundamentals

Minnesota, University of

143

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

144

Implementation of Revision 19 of the TRUPACT-II Safety Analysis Report at Rocky Flats Environmental Technology Site  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission on July 27, 2001 approved Revision 19 of the TRUPACT-II Safety Analysis Report (SAR) and the associated TRUPACT-II Authorized Methods for Payload Control (TRAMPAC). Key initiatives in Revision 19 included matrix depletion, unlimited mixing of shipping categories, a flammability assessment methodology, and an alternative methodology for the determination of flammable gas generation rates. All U.S. Department of Energy (DOE) sites shipping transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) were required to implement Revision 19 methodology into their characterization and waste transportation programs by May 20, 2002. An implementation process was demonstrated by the Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado. The three-part process used by RFETS included revision of the site-specific TRAMPAC, an evaluation of the contact-handled TRU waste inventory against the regulations in Revision 19, and design and development of software to facilitate future inventory analyses.

D'Amico, E.; O'Leary, J.; Bell, S.; Djordjevic, S.; Givens, C,; Shokes, T.; Thompson, S.; Stahl, S.

2003-02-25T23:59:59.000Z

145

Mathieu functions computational toolbox implemented in Matlab  

E-Print Network [OSTI]

The Mathieu functions are used to solve analytically some problems in elliptical cylinder coordinates. A computational toolbox was implemented in Matlab. Since the notation and normalization for Mathieu functions vary in the literature, we have included sufficient material to make this presentation self contained. Thus, all formulas required to get the Mathieu functions are given explicitly. Following the outlines in this presentation, the Mathieu functions could be readily implemented in other computer programs and used in different domains. Tables of numerical values are provided.

E. Cojocaru

2008-11-12T23:59:59.000Z

146

Energy storage for frequency regulation on the electric grid  

E-Print Network [OSTI]

Ancillary services such as frequency regulation are required for reliable operation of the electric grid. Currently, the same traditional thermal generators that supply bulk power also perform nearly all frequency regulation. ...

Leitermann, Olivia

2012-01-01T23:59:59.000Z

147

Design and implementation of an automated battery management platform  

E-Print Network [OSTI]

This thesis describes the design and the implementation of the hardware platform for automated battery management with battery changing/charging capability for autonomous UAV missions with persistency requirement that ...

Toksoz, Tuna

2012-01-01T23:59:59.000Z

148

Small Business Administration Recovery Act Implementation | Department...  

Broader source: Energy.gov (indexed) [DOE]

Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small Business Administration Recovery Act Implementation Small...

149

Design and implementation of a prototype generator monitoring system  

E-Print Network [OSTI]

DESIGN AND IMPLEMENTATION OF A PROTOTYPE GENERATOR MONITORING SYSTEM A Thesis JIANYONG SUN Submitted to the Office of Graduate Studies of Texas ASM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May... 1996 Major Subject: Electrical Engineering DESIGN AND IMPLEMENTATION OF A PROTOTYPE GENERATOR MONITORING SYSTEM A Thesis by JIANYONG SUN Submitted to Texas ASM University in partial fulfillment of the requirements for the degree of MASTER...

Sun, Jianyong

1996-01-01T23:59:59.000Z

150

Conduct of Operations Requirements for DOE Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

"To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

1990-07-09T23:59:59.000Z

151

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... when a motor fails and must either be replaced or repaired. This is represented visually in Figure 1. When purchasing a motor for a new application, time is usually available to consider various options. However, once a motor has failed...

Elliott, R. N.

152

Implementation of Sustainability at  

E-Print Network [OSTI]

0 Assessing Implementation of Sustainability at UiO Grønt UiO S u s t a i n a b i l i t y i n R e sustainability commitment among universities and proposed Best Green University Practices in 2010. It presents the current status of UiO Environmental Sustainability. #12;1 If you cannot measure it, you cannot manage it

Johansen, Tom Henning

153

FLORIDA ATLANTIC UNIVERSITY NOTICE OF PROPOSED REGULATION REPEAL  

E-Print Network [OSTI]

in 1975 and last amended in 1987. Regulation 4.002 is no longer necessary in lieu of the implementation, Boca Raton, Florida, 33431, (561) 297-3007 (phone), (561) 297-2787 (fax), GeneralCounsel@fau.edu. #12;

Richman, Fred

154

Online regulations of low order systems under bounded control  

E-Print Network [OSTI]

Time-optimal solutions provide us with the fastest means to regulate a system in presence of input constraints. This advantage of time-optimal control solutions is offset by the fact that their real-time implementation involves computationally...

Arora, Sumit

2004-09-30T23:59:59.000Z

155

Drug-Free Federal Workplace Testing Implementation Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides guidance and policy for the administration, application and implementation of the DOE Drug-free Federal Workplace Plan and other regulations that facilitate the maintenance of a drug-free Federal workplace through the establishment of programs to test for the use of illegal drugs. Chg 1, dated 8-21-92

1988-07-29T23:59:59.000Z

156

Implementing Shor's algorithm on Josephson charge qubits  

SciTech Connect (OSTI)

We investigate the physical implementation of Shor's factorization algorithm on a Josephson charge qubit register. While we pursue a universal method to factor a composite integer of any size, the scheme is demonstrated for the number 21. We consider both the physical and algorithmic requirements for an optimal implementation when only a small number of qubits are available. These aspects of quantum computation are usually the topics of separate research communities; we present a unifying discussion of both of these fundamental features bridging Shor's algorithm to its physical realization using Josephson junction qubits. In order to meet the stringent requirements set by a short decoherence time, we accelerate the algorithm by decomposing the quantum circuit into tailored two- and three-qubit gates and we find their physical realizations through numerical optimization.

Vartiainen, Juha J.; Salomaa, Martti M. [Materials Physics Laboratory, POB 2200 (Technical Physics), Helsinki University of Technology, FIN-02015 HUT (Finland); Niskanen, Antti O. [VTT Information Technology, Microsensing, POB 1207, 02044 VTT (Finland); Nakahara, Mikio [Materials Physics Laboratory, POB 2200 (Technical Physics), Helsinki University of Technology, FIN-02015 HUT (Finland); Department of Physics, Kinki University, Higashi-Osaka 577-8502 (Japan)

2004-07-01T23:59:59.000Z

157

Safety of magnetic fusion facilities: Requirements  

SciTech Connect (OSTI)

This Standard identifies safety requirements for magnetic fusion facilities. Safety functions are used to define outcomes that must be achieved to ensure that exposures to radiation, hazardous materials, or other hazards are maintained within acceptable limits. Requirements applicable to magnetic fusion facilities have been derived from Federal law, policy, and other documents. In addition to specific safety requirements, broad direction is given in the form of safety principles that are to be implemented and within which safety can be achieved.

NONE

1996-05-01T23:59:59.000Z

158

ORISE: Policy Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory |CHEMPACK MappingHistory TheManagement ManPolicy Implementation

159

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

160

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Design and Implementation of an International Training Program on Repository Development and Management  

SciTech Connect (OSTI)

Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This paper discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)

Vugrin, K.W. [Sandia National Laboratories Carlsbad Programs Group, Performance Assessment and Decision Analysis Department, Carlsbad, NM (United States); Twitchell, Ch.A. [Sandia National Laboratories, Carlsbad Programs Group, Center Business Operations Department, Carlsbad, NM (United States)

2008-07-01T23:59:59.000Z

162

Re: NBP RFI-Implementing the National Broadband Plan by Studying...  

Broader source: Energy.gov (indexed) [DOE]

Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the...

163

LIBRARY REGULATIONS 1. THE LIBRARY POLICY COMMITTEE  

E-Print Network [OSTI]

1 LIBRARY REGULATIONS 1. THE LIBRARY POLICY COMMITTEE 1.1 The Library Policy Committee shall shall be: [i] to formulate proposals in regard to policy matters relating to the Library for consideration by the Academic Council and the Governing Body; [ii] to monitor the implementation of Library

Schellekens, Michel P.

164

Guidebook for Six Sigma Implementation  

E-Print Network [OSTI]

Guidebook for Six Sigma Implementation with Real Time Applications Editorial Committee Chairman: Dr & QUALITY COUNCIL OF INDIA A unique book on Six sigma implementation strategy with Real time case studies Now available !!! Now available !!! #12;Guidebook for Six Sigma Implementation with Real Time

Bandyopadhyay, Antar

165

Implementation of multipartite unitary operations with limited resources  

E-Print Network [OSTI]

A general method for implementing weakly entangling multipartite unitary operations using a small amount of entanglement and classical communication is presented. For the simple Hamiltonian \\sigma_z\\otimes\\sigma_z this method requires less entanglement than previously known methods. In addition, compression of multiple operations is applied to reduce the average communication required.

Dominic W. Berry

2006-08-20T23:59:59.000Z

166

Energy standards and model codes development, adoption, implementation, and enforcement  

SciTech Connect (OSTI)

This report provides an overview of the energy standards and model codes process for the voluntary sector within the United States. The report was prepared by Pacific Northwest Laboratory (PNL) for the Building Energy Standards Program and is intended to be used as a primer or reference on this process. Building standards and model codes that address energy have been developed by organizations in the voluntary sector since the early 1970s. These standards and model codes provide minimum energy-efficient design and construction requirements for new buildings and, in some instances, existing buildings. The first step in the process is developing new or revising existing standards or codes. There are two overall differences between standards and codes. Energy standards are developed by a consensus process and are revised as needed. Model codes are revised on a regular annual cycle through a public hearing process. In addition to these overall differences, the specific steps in developing/revising energy standards differ from model codes. These energy standards or model codes are then available for adoption by states and local governments. Typically, energy standards are adopted by or adopted into model codes. Model codes are in turn adopted by states through either legislation or regulation. Enforcement is essential to the implementation of energy standards and model codes. Low-rise residential construction is generally evaluated for compliance at the local level, whereas state agencies tend to be more involved with other types of buildings. Low-rise residential buildings also may be more easily evaluated for compliance because the governing requirements tend to be less complex than for commercial buildings.

Conover, D.R.

1994-08-01T23:59:59.000Z

167

Graduation Requirements and Procedures Graduation Requirements and  

E-Print Network [OSTI]

/Degree Audit (DARS) or contact the department offering the major. Graduation Average Requirement The minimum

168

Safety Basis Requirements for Nonnuclear Facilities at Lawrence Livermore National Laboratory Site-Specific Work Smart Standards Revision 1  

SciTech Connect (OSTI)

This standard establishes requirements that, when coupled with Lawrence Livermore National Laboratory's (LLNL's) Integrated Safety Management System (ISMS) methods and other Work Smart Standards for assuring worker safety, assure that the impacts of nonnuclear operations authorized in LLNL facilities are well understood and controlled in a manner that protects the health of workers, the public, and the environment. All LLNL facilities shall be classified based on potential for adverse impact of operations to the health of co-located (i.e., nearby) workers and the public in accordance with this standard, Title 10 Code of Federal Regulations (10 CFR) 830, Subpart B, and Department of Energy Order (DOE O) 420.2A. This standard provides information on: Objectives; Applicability; Safety analysis requirements; Control selection and maintenance; Documentation requirements; Safety basis review, approval, and renewal; and Safety basis implementation.

Beach, R; Brereton, S; Failor, R; Hildum, S; Spagnolo, S; Van Warmerdam, C

2003-02-24T23:59:59.000Z

169

Equipment Operational Requirements  

SciTech Connect (OSTI)

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

170

Environmental implementation plan  

SciTech Connect (OSTI)

In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

Peterson, G.L.

1994-10-04T23:59:59.000Z

171

EPICS Version 4 - Implementing Complex Data Types  

SciTech Connect (OSTI)

Through phase 1 and phase 2 SBIR grants, s fully functional I/O Controller and communication protocol for version 4 of EPICS is completed. This new software architecture provides a flexible and extendible architecture. Version 4 is implemented fully in Java. The performance metrics look promising. The final portion of phase 2 is to optimize the communication mechanisms. Subsequent work on different aspects of this are required to provide a viable solutions in various areas. Version 3 of EPICS is able to provide a platform for implementing channel based control, because the channel and attributes for time stamping, alarm, display and control were narrow, well defined, and complete. To extend EPICS functionality beyond this, it is necessary to define attributes needed for archive data, array, image data, and directory services. The proper handling of several array types enables the development of middle layer servers such as orbit and bump control in accelerators. Phase 1 should produce a well defined, reviewed, and agreed upon definition of the metadata required for these services. A Phase 2 grant would provide tools that implemented archiving, general array, imaging, and directory applications.

Marty Kraimer,; John dalesio

2012-11-27T23:59:59.000Z

172

TRUPACT-1 implementation plan  

SciTech Connect (OSTI)

TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

1985-09-01T23:59:59.000Z

173

High-level waste storage tank farms/242-A evaporator standards/requirements identification document (S/RID), Vol. 5  

SciTech Connect (OSTI)

The Fire Protection functional area for the Hanford Site Tank Farm facilities and support structures is based on the application of relevant DOE orders, regulations, and industry codes and standards. The fire protection program defined in this document may be divided into three areas: (1) organizational, (2) administrative programmatic features, and (3) technical features. The information presented in each section is in the form of program elements and orders, regulations, industry codes, and standards that serve as the attributes of a fire protection program for the Tank Farm facilities. Upon completion this document will be utilized as the basis to evaluate compliance of the fire protection program being implemented for the Tank Farm facilities with the requirements of DOE orders and industry codes and standards.

Not Available

1994-04-01T23:59:59.000Z

174

Savannah River Site Environmental Implementation Plan  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

175

Conduct of operations implementation plan  

SciTech Connect (OSTI)

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

176

Single Core Implementation of Blue Midnight Wish Hash Function on VIRTEX 5  

E-Print Network [OSTI]

functionality with finalization implementation without padding stage of BMW on Xilinx Virtex-5 FPGA requires 51 slices for BMW- 256 and 105 slices for BMW-512. Both BMW versions require two blocks of memory: one the instruction controls. The proposed implementation achieves a throughput of 68.71 Mpbs for BMW-256 and 112

Nřrvĺg, Kjetil

177

Discovery of a Splicing Regulator Required for Cell Cycle Progression...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

conserved across modern eukaryotic kingdoms. Citation: Suvorova ES, M Croken, S Kratzer, LM Ting, M Conde de Felipe, B Balu, LM Markillie, LM Weiss, K Kim, and MW...

178

Discovery of a Splicing Regulator Required for Cell Cycle Progression. |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phasesDataTranslocation ofthe APSDiscover E forVesicles toEMSL a

179

Trials and tribulations implementing the Clean Air Act Title V in fourteen air districts  

SciTech Connect (OSTI)

Santa Fe pacific Pipeline Partners, L.P. (SFPP) is a refined petroleum pipeline operating in six states in the western United States. Sixteen terminals are subject to the Title V permit to operate requirements. There are many obstacles to overcome, not only when preparing applications for Title V operating permits, but in the implementation phase of the project as well. Each Air District has its own set of rules and regulations that must be adhered to in preparing the application. For example, some districts required the insignificant sources to be documented and included in compliance plans and some do not. The format required for the application varies from stringent forms that must be completed to no forms at all. In preparing the Title V application for SFPP, the author quickly realized if this confusion was transferred to the implementation phase, compliance would be a failure. Therefore, early on the environmental manager instituted a training program. Beginning with a pilot program in one district the author began training managers and supervisors. This program quickly was expanded to include senior vice presidents and technicians. This training session was a one hour of general overview to visually describe how the Title V process would affect the facilities. As a result of this training, virtually every employee became familiar with how the Title V program was affecting the facilities. Engineering and Customer Service is instructed to notify the manager of any and every new project so it could undergo a review to determine if it affected a Title V facility. The field acts as a check of the system. Any change or modification at any facility is immediately under scrutiny for Title V implications. Another obstacle to overcome is to help the facility deal with something that is new and basically a different way of operating.

Moore, C. [Environmental Affairs Santa Fe Pacific Pipeline Partners, Orange, CA (United States)

1998-12-31T23:59:59.000Z

180

Workshop in Regulation &  

E-Print Network [OSTI]

Electric Institute, "Regulatory Issues" Michael A. Crew, Rutgers University, "Incentive Regulation" Howard

Lin, Xiaodong

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Stack Height Requirements (Ohio)  

Broader source: Energy.gov [DOE]

This chapter of the law establishes that the Ohio Environmental Protection Agency provides regulations for stacks for industrial facilities. “Stack” means any chimney, flue, conduit or duct...

182

Energy Sector Cybersecurity Framework Implementation Guidance  

Broader source: Energy.gov (indexed) [DOE]

DRAFT FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of...

183

Efficiency First - Contractor Outreach: Design & Implementation...  

Energy Savers [EERE]

Efficiency First - Contractor Outreach: Design & Implementation for Residential Retrofit Programs Efficiency First - Contractor Outreach: Design & Implementation for Residential...

184

Federal strategies to increase the implementation of combined heat and power technologies in the United States  

SciTech Connect (OSTI)

Recent interest in combined heat and power (CHP) is providing momentum to efforts aimed at increasing the capacity of this highly-efficient technology. Factors driving this increase in interest include the need to increase the efficiency of the nation's electricity generation infrastructure, DOE Assistant Secretary Dan Reicher's challenge to double the capacity of CHP by 2010, the success of DOE's Advanced Turbine Systems Program in supporting ultra-efficient CHP technologies, and the necessity of finding cost-effective solutions to address climate change and air quality issues. The federal government is committed to increasing the penetration of CHP technologies in the US. The ultimate goal is to build a competitive market for CHP in which policies and regulations support the implementation of a full suite of technologies for multiple applications. Specific actions underway at the federal level include technology strategies to improve CHP data collection and assessment and work with industry to encourage the development of advanced CHP technologies. Policy strategies include changes to federal environmental permitting procedures including CHP-friendly strategies in federal restructuring legislation, supporting tax credits and changes to depreciation requirements as economic incentives to CHP, working with industry to leverage resources in the development of advanced CHP technologies, educating state officials about the things they can do to encourage CHP, and increasing awareness about the benefits of CHP and the barriers limiting its increased implementation.

Laitner, J.; Parks, W.; Schilling, J.; Scheer, R.

1999-07-01T23:59:59.000Z

185

Biofuel and Bioenergy implementation scenarios  

E-Print Network [OSTI]

and bioenergy markets are modelled with the aim to conduct quantitative analyses on the production and costsBiofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies #12;Biofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies By André

186

Integrating Customized Test Requirements with Traditional  

E-Print Network [OSTI]

between QA and Development by Michal Blumenstyk 4. Causes of Failures in Web Applications by Solia Pertet.9) Deployment Users Test Cases Web Application Implementation (v.1.0) User Sessions Replay Tool Test Cases-WEB, July 2006 Sreedevi Sampath . University of Delaware 5/29 Program Coverage-based Test Requirement

Sampath, Sreedevi

187

Implementation of NUREG 1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

This paper discusses the implementation of a quality assurance program that fulfills the requirements of the U.S. Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements for the identification of items and activities important to public radiological safety and waste isolation for placement on a Q-List and Quality Activities List and also for graded application of QA measures. The process and organization for implementing this guidance is discussed.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L. [Science Applications International Corp., Las Vegas, NV (USA)

1990-10-01T23:59:59.000Z

188

Implementation of NUREG-1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

The US Department of Energy`s Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ``Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements`` for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

1990-04-01T23:59:59.000Z

189

The requirements discovery process  

SciTech Connect (OSTI)

Cost and schedule overruns are often caused by poor requirements that are produced by people who do not understand the requirement process. This paper provides a high-level overview of the requirements discovery process.

Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States). Systems and Industrial Engineering; Dean, F.F. [Sandia National Lab., Albuquerque, NM (United States)

1997-02-01T23:59:59.000Z

190

SAR polar format implementation with MATLAB.  

SciTech Connect (OSTI)

Traditional polar format image formation for Synthetic Aperture Radar (SAR) requires a large amount of processing power and memory in order to accomplish in real-time. These requirements can thus eliminate the possible usage of interpreted language environments such as MATLAB. However, with trapezoidal aperture phase history collection and changes to the traditional polar format algorithm, certain optimizations make MATLAB a possible tool for image formation. Thus, this document's purpose is two-fold. The first outlines a change to the existing Polar Format MATLAB implementation utilizing the Chirp Z-Transform that improves performance and memory usage achieving near realtime results for smaller apertures. The second is the addition of two new possible image formation options that perform a more traditional interpolation style image formation. These options allow the continued exploration of possible interpolation methods for image formation and some preliminary results comparing image quality are given.

Martin, Grant D.; Doerry, Armin Walter

2005-11-01T23:59:59.000Z

191

Marketing Strategy and Implementation  

SciTech Connect (OSTI)

This report documents the preparation of materials for the marketing campaign that has been designed for middle and high school students in New Mexico to increase interest in participation in national security careers at the National Nuclear Security Administration. The materials and the marketing campaign build on the research that was previously completed, as well as the focus groups that were conducted. This work is a part of the National Nuclear Security Preparedness Project (NSPP). Previous research included outcome analysis to determine appropriate marketing strategies. The analysis was based upon focus groups with middle school and high school students, student interactions, and surveys completed by students to understand and gauge student interest in Science, Technology, Engineering, and Math (STEM) subjects, interest in careers at NNSA, future job considerations, and student desire to pursue post-secondary education. Further, through the focus groups, students were asked to attend a presentation on NNSA job opportunities and employee requirements. The feedback received from the students was utilized to develop the focus and components of a marketing campaign divided into DISCO (Discovering Intelligence and Security Career Opportunities) for the middle school age group and DISCO…..Your Way! for high school age groups. Both campaigns have an intertwined message that focuses on the education of students in the various national security career opportunities at NNSA using the STEM concepts and the notion that almost any career they can think of has a fit within NNSA. Further, a special emphasis has been placed on the importance of obtaining a national security clearance when working at NNSA and the steps that will need to be taken during middle school, high school, and college to be allowed this opportunity.

None

2010-09-30T23:59:59.000Z

192

Creating a methodology and tool to capture and resolve conflicts in developing software requirements: Requirement Lifecycle Modeling Views manager (RLMV)  

E-Print Network [OSTI]

for change. Fig. 2. The Revision View in RLMV The purpose of the Use Case View is to describe "the behavior of the system as seen by its end users, analysts, and testers" (Booch, Jacobson, and Rumbaugh, 1999). It does not specify the organization.... . Code Implementation. . User Interface. 4 9 13 13 FUTURE IMPROVEMENTS. 16 CONCLUSION. 17 REFERENCES. APPENDIX A. 19 LIST OF FIGURES FIGURE I Requirement View implemented in RLMV. . . . . PAGE 2 Revision View implemented in RLMV...

Herrera, Leeha Rae-Lyn

2013-02-22T23:59:59.000Z

193

Application Filing Requirements for Natural Gas Pipeline Construction Projects (Wisconsin)  

Broader source: Energy.gov [DOE]

Any utility proposing to construct a natural gas pipeline requiring a Certificate of Authority (CA) under Wis. Stat. §196.49 must prepare an application for Commission review.  These regulations ...

194

Compliance with revised acid rain monitoring requirements for gas and oil fired units: Appendix D and E of Part 75  

SciTech Connect (OSTI)

EPA`s CEM rule (40 CFR Part 75) implements the monitoring provisions of Title IV of the Clean Air Act Amendments of 1990. In most cases Part 75 requires utilities to monitor sulfur dioxide (SO{sub 2}), nitrogen oxide (NO{sub x}) and carbon dioxide emissions (CO{sub 2}), and volumetric flow and opacity using Continuous Emissions Monitoring Systems (CEMS). Appendix D and E of 40 CFR Part 75 provide alternatives to using Continuous Emissions Monitoring Systems (CEMS) to comply with the monitoring requirements of Title IV of the Clean Air Act. EPA is considering a number of changes to Part 75, including significant changes to Appendix D and E. Part 75 was originally promulgated on January 11, 1993. Due to both experience gained in the implementation of Phase 1 and the early implementation of Phase 2 and petitions filed by several groups, EPA has prepared a number of changes to Part 75. This paper discusses what EPA anticipates these changes will be and how EPA anticipates that these changes will affect the regulated community. In addition, it discusses EPA`s expectations for certification applications for units using Appendix D and E.

Sheppard, M.; Culligan, K. [EPA, Washington, DC (United States). Acid Rain Div.

1995-12-31T23:59:59.000Z

195

Operating Reserves: Billing Implementation Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

D M I N I S T R A T I O N 2 Overview Explain the billing delay in implementing new WECC OR standards Customer outreach New project schedule Review new OR billing...

196

HUD Choice Neighborhoods Implementation Grants  

Broader source: Energy.gov [DOE]

The U.S. Department of Housing and Urban Development (HUD) is accepting applications to support communities that have undergone a comprehensive local planning process and are ready to implement their "Transformation Plan" to redevelop the neighborhood.

197

Environment, safety, and health regulatory implementation plan  

SciTech Connect (OSTI)

To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project`s environment, safety, and health (ES&H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project`s regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES&H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status.

Not Available

1993-10-21T23:59:59.000Z

198

Natural Gas Regulations (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation title 805 promulgates the rules and regulations pertaining to natural gas production in Kentucky. In addition to KAR title 405, chapter 30, which pertains to any...

199

VISA ISSUES The Spanish Ministry of Foreign Affairs and Cooperation establishes some requirements for  

E-Print Network [OSTI]

of the Schengen Borders Code · Art. 25 of the Aliens Act · Arts. 4 ff. of the Aliens Regulation These requirements

200

3 Library Regulations Definitions  

E-Print Network [OSTI]

3 Library Regulations Definitions In Regulation 3: 'Library' means the University Library as defined in Regulation 3.1; 'Library staff' means the staff of the University Library; 'Librarian' means the University Librarian and Head of Information Resources Directorate or nominee; `Library Committee' means

Mottram, Nigel

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Computer Use Regulation Introduction  

E-Print Network [OSTI]

Computer Use Regulation #12;Introduction · The following training materials will reference the contents of the Computer Use Regulations, but should not serve as a substitute for reading the actual responsibilities NCSU employees have under the regulations. · North Carolina State University's computer networks

Liu, Paul

202

Policy Forum Series Sustainable Communities -Implementation Challenges and Opportunities  

E-Print Network [OSTI]

savings o $4K/acre in increased local revenues o $3K/household in avoided transport/energy/water costs strategies, and local implementation challenges - realizing this potential will require a deeper and each MPO created a "sustainable communities strategy (SCS)" that demonstrates how the region plans

California at Davis, University of

203

Drug-Free Federal Workplace Testing Implementation Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The subject directive provides requirements and responsibilities for the implementation of a workplace program to test for the use of illegal drugs to facilitate the maintenance of a drug-free Federal workplace. In the course of the revision, the document number will change from DOE O 3792.3 to DOE O 343.1.

2012-12-06T23:59:59.000Z

204

Synthesis of Parallel Hardware Implementations from Synchronous Dataflow Graph Specifications  

E-Print Network [OSTI]

of automated register­transfer level (RTL) VHDL code generation from synchronous dataflow (SDF) graph for mapping applications specified in SDF to parallel digital hardware implementations. Two styles synthesis from SDF graphs is presented. In order to minimize cost while meeting performance require­ ments

205

Westinghouse Hanford Company Pollution Prevention Program Implementation Plan  

SciTech Connect (OSTI)

This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

Floyd, B.C.

1994-10-01T23:59:59.000Z

206

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils is disclosed. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components. 1 fig.

Wagner, L.M.; Strum, M.J.

1998-12-15T23:59:59.000Z

207

Load regulating expansion fixture  

DOE Patents [OSTI]

A free standing self contained device for bonding ultra thin metallic films, such as 0.001 inch beryllium foils. The device will regulate to a predetermined load for solid state bonding when heated to a bonding temperature. The device includes a load regulating feature, whereby the expansion stresses generated for bonding are regulated and self adjusting. The load regulator comprises a pair of friction isolators with a plurality of annealed copper members located therebetween. The device, with the load regulator, will adjust to and maintain a stress level needed to successfully and economically complete a leak tight bond without damaging thin foils or other delicate components.

Wagner, Lawrence M. (San Jose, CA); Strum, Michael J. (San Jose, CA)

1998-01-01T23:59:59.000Z

208

Method to determine transcriptional regulation pathways in organisms  

DOE Patents [OSTI]

The invention relates to computer-implemented methods and systems for identifying regulatory relationships between expressed regulating polypeptides and targets of the regulatory activities of such regulating polypeptides. More specifically, the invention provides a new method for identifying regulatory dependencies between biochemical species in a cell. In particular embodiments, provided are computer-implemented methods for identifying a regulatory interaction between a transcription factor and a gene target of the transcription factor, or between a transcription factor and a set of gene targets of the transcription factor. Further provided are genome-scale methods for predicting regulatory interactions between a set of transcription factors and a corresponding set of transcriptional target substrates thereof.

Gardner, Timothy S.; Collins, James J.; Hayete, Boris; Faith, Jeremiah

2012-11-06T23:59:59.000Z

209

Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations  

SciTech Connect (OSTI)

In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

Witte, M.C.

1994-10-01T23:59:59.000Z

210

Frequency Regulation Basics and Trends  

SciTech Connect (OSTI)

The electric power system must address two unique requirements: the need to maintain a near real-time balance between generation and load, and the need to adjust generation (or load) to manage power flows through individual transmission facilities. These requirements are not new: vertically integrated utilities have been meeting them for a century as a normal part of conducting business. With restructuring, however, the services needed to meet these requirements, now called ''ancillary services'', are being more clearly defined. Ancillary services are those functions performed by the equipment and people that generate, control, and transmit electricity in support of the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission (FERC) has defined such services as those ''necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system''. This statement recognizes the importance of ancillary services for both bulk-power reliability and support of commercial transactions. Balancing generation and load instantaneously and continuously is difficult because loads and generators are constantly fluctuating. Minute-to-minute load variability results from the random turning on and off of millions of individual loads. Longer-term variability results from predictable factors such as the daily and seasonal load patterns as well as more random events like shifting weather patterns. Generators also introduce unexpected fluctuations because they do not follow their generation schedules exactly and they trip unexpectedly due to a range of equipment failures. The output from wind generators varies with the wind. Storage technologies should be ideal suppliers of several ancillary services, including regulation, contingency reserves (spinning reserve, supplemental reserve, replacement reserve), and voltage support. These services are not free; in regions with energy markets, generators are paid to supply these services. In vertically integrated utilities (without energy markets) the utility incurs significant costs to supply these services. Supplying these services may be a significant business opportunity for emerging storage technologies. This report briefly explores the various ancillary services that may be of interest to storage. It then focuses on regulation, the most expensive ancillary service. It also examines the impact that increasing amounts of wind generation may have on regulation requirements, decreasing conventional regulation supplies, and the implications for energy storage.

Kirby, BJ

2005-05-06T23:59:59.000Z

211

Allocating Reserve Requirements (Presentation)  

SciTech Connect (OSTI)

This presentation provides an overview of present and possible future ways to allocate and assign benefits for reserve requirements.

Milligan, M.; Kirby, B.; King, J.

2011-07-01T23:59:59.000Z

212

BER Science Network Requirements  

E-Print Network [OSTI]

Management and analysis of geospatial data involvingmanipulation, analysis, and display of geospatial data,Analysis and interpretation require mapping geospatial

Dart, Eli

2011-01-01T23:59:59.000Z

213

Federal Sector Renewable Energy Project Implementation: ""What...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by...

214

Renewable Energy Project Planning and Implementation | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Planning and Implementation Renewable Energy Project Planning and Implementation Federal renewable energy projects can be large or small and managed by a third-party or the agency....

215

Energy Efficiency Financing Program Implementation Primer | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Efficiency Financing Program Implementation Primer Energy Efficiency Financing Program Implementation Primer This primer provides an overview of key considerations for state and...

216

Stimulating Energy Efficiency in Kentucky: An Implementation...  

Broader source: Energy.gov (indexed) [DOE]

Stimulating Energy Efficiency in Kentucky: An Implementation Model for States Stimulating Energy Efficiency in Kentucky: An Implementation Model for States This presentation, given...

217

Financing Program Design and Implementation Considerations  

Broader source: Energy.gov [DOE]

Designing and implementing clean energy financing programs takes more than simply identifying applicable financing structures and implementing them. State and local governments should also take...

218

FES Science Network Requirements  

E-Print Network [OSTI]

FES Science Network Requirements Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008 #12;FES Science Network Requirements Workshop Fusion Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Gaithersburg, MD ­ March 13 and 14, 2008 ESnet

Geddes, Cameron Guy Robinson

219

Regulating forest practices in Texas: a problem analysis  

E-Print Network [OSTI]

REGULATING FOREST PRACTICES IN TEXAS: A PROBLEM ANALYSIS A Thesis by ALAN DALE DREESEN Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August 1977 Ma...]or Subject: Forestry REGULATING FOREST PRACTICES IN TEXAS: A PROBLEM ANALYSIS A Thesis by ALAN DALE DREESEN Approved as to style and content by: (Chair of Committee) ( ead of Depa t nt) (Member) (Member) August 1977 ABSTRACT Regulating Forest...

Dreesen, Alan D

1977-01-01T23:59:59.000Z

220

Automated Requirements Testing with Abstract Oracles Bernhard K. Aichernig  

E-Print Network [OSTI]

, a mapping between abstract and concrete test data is required. The presented framework focuses on the usage of formal requirements specifications as test ora­ cles for concrete implementations. The approach is based, then the model may serve as a test oracle and specification as well. In Fig­ A A op abstract C C op concrete r r

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Transportation System Requirements Document  

SciTech Connect (OSTI)

This Transportation System Requirements Document (Trans-SRD) describes the functions to be performed by and the technical requirements for the Transportation System to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from Purchaser and Producer sites to a Civilian Radioactive Waste Management System (CRWMS) site, and between CRWMS sites. The purpose of this document is to define the system-level requirements for Transportation consistent with the CRWMS Requirement Document (CRD). These requirements include design and operations requirements to the extent they impact on the development of the physical segments of Transportation. The document also presents an overall description of Transportation, its functions, its segments, and the requirements allocated to the segments and the system-level interfaces with Transportation. The interface identification and description are published in the CRWMS Interface Specification.

Not Available

1993-09-01T23:59:59.000Z

222

FLORIDA ATLANTIC UNIVERSITY NOTICE OF PROPOSED REGULATION AMENDMENT  

E-Print Network [OSTI]

and Loitering, was last amended in November 1987 and requires amendment to conform with new administrative/REPEAL OF REGULATIONS IS: Myrlande Dessalines, Paralegal, Office of the General Counsel, 777 Glades Road, Boca Raton

Richman, Fred

223

Transcriptional Regulation by CHIP/LDB Complexes Revital Bronstein1  

E-Print Network [OSTI]

Segal1 * 1 Department of Microbiology and Biotechnology, Tel Aviv University, Tel Aviv, Israel, 2 to the study of transcription regulation of gene batteries required for development. Citation: Bronstein R

Shamir, Ron

224

Division of Water, Part 673: Dam Safety Regulations (New York)  

Broader source: Energy.gov [DOE]

These regulations address dam safety, define dam hazard categories and inspection procedures, and apply to any owner of a dam. Dam owners are required to maintain dams in a safe condition at all...

225

WHC natural phenomena hazards mitigation implementation plan  

SciTech Connect (OSTI)

Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

Conrads, T.J.

1996-09-11T23:59:59.000Z

226

Scaling issues in ensemble implementations of the Deutsch-Jozsa algorithm  

E-Print Network [OSTI]

We discuss the ensemble version of the Deutsch-Jozsa (DJ) algorithm which attempts to provide a "scalable" implementation on an expectation-value NMR quantum computer. We show that this ensemble implementation of the DJ algorithm is at best as efficient as the classical random algorithm. As soon as any attempt is made to classify all possible functions with certainty, the implementation requires an exponentially large number of molecules. The discrepancies arise out of the interpretation of mixed state density matrices.

Arvind; David Collins

2003-07-21T23:59:59.000Z

227

Pressure reducing regulator  

DOE Patents [OSTI]

A pressure reducing regulator that controls its downstream or outlet pressure to a fixed fraction of its upstream or inlet pressure. The regulator includes a housing which may be of a titanium alloy, within which is located a seal or gasket at the outlet end which may be made of annealed copper, a rod, and piston, each of which may be made of high density graphite. The regulator is insensitive to temperature by virtue of being without a spring or gas sealed behind a diaphragm, and provides a reference for a system in which it is being used. The rod and piston of the regulator are constructed, for example, to have a 1/20 ratio such that when the downstream pressure is less than 1/20 of the upstream pressure the regulator opens and when the downstream pressure exceeds 1/20 of the upstream pressure the regulator closes.

Whitehead, John C. (Davis, CA); Dilgard, Lemoyne W. (Willits, CA)

1995-01-01T23:59:59.000Z

228

DATA BASE DESIGN AND IMPLEMENTATION  

E-Print Network [OSTI]

, integrity constraints, A brief history of database applications When not to use database Fundamentals8/26/2010 1 1 ITCS 3160 DATA BASE DESIGN AND IMPLEMENTATION JING YANG 2010 FALL Class 2: Database System Concepts and Architecture Review of Class 1 2 Database MDatabase management systems (DBMS) Concept

Yang, Jing

229

DATA BASE DESIGN AND IMPLEMENTATION  

E-Print Network [OSTI]

Approach A Brief History of Database Applications When Not to Use a DBMS Fundamentals of Database Systems8/24/2010 1 ITCS 3160 DATA BASE DESIGN AND IMPLEMENTATION JING YANG 2010 FALL Class 1 Database and database users Outline Introduction A 2 An Example Characteristics of the Database Approach Actors

Yang, Jing

230

Implementing Nutrient Management Practices in  

E-Print Network [OSTI]

/Implementation Efforts Nutrient and Pest Management Program (NPM) Certified Crop Adviser (CCA) Training Local Nutrient Assurance Team #12;Nutrient & Pest Management (NPM) Program What we do · Promote agricultural management conservation staff. · Over 400 participants to date Presented by: UWEX, NPM, DATCP, NRCS Financial support

Balser, Teri C.

231

Cyber Security Requirements for Risk Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice ensures that system owners consistently assess the threats to and vulnerabilities of systems in order to implement adequate security controls. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, and protect DOE information and information systems from unauthorized access, use, disclosure, modification, or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

2004-02-19T23:59:59.000Z

232

NRC - regulator of nuclear safety  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) was formed in 1975 to regulate the various commercial and institutional uses of nuclear energy, including nuclear power plants. The agency succeeded the Atomic Energy Commission, which previously had responsibility for both developing and regulating nuclear activities. Federal research and development work for all energy sources, as well as nuclear weapons production, is now conducted by the U.S. Department of Energy. Under its responsibility to protect public health and safety, the NRC has three principal regulatory functions: (1) establish standards and regulations, (2) issue licenses for nuclear facilities and users of nuclear materials, and (3) inspect facilities and users of nuclear materials to ensure compliance with the requirements. These regulatory functions relate to both nuclear power plants and to other uses of nuclear materials - like nuclear medicine programs at hospitals, academic activities at educational institutions, research work, and such industrial applications as gauges and testing equipment. The NRC places a high priority on keeping the public informed of its work. The agency recognizes the interest of citizens in what it does through such activities as maintaining public document rooms across the country and holding public hearings, public meetings in local areas, and discussions with individuals and organizations.

NONE

1997-05-01T23:59:59.000Z

233

Smart Grid Information Security (IS) Functional Requirement  

E-Print Network [OSTI]

It is important to implement safe smart grid environment to enhance people's lives and livelihoods. This paper provides information on smart grid IS functional requirement by illustrating some discussion points to the sixteen identified requirements. This paper introduces the smart grid potential hazards that can be referred as a triggering factor to improve the system and security of the entire grid. The background of smart information infrastructure and the needs for smart grid IS is described with the adoption of hermeneutic circle as methodology. Grid information technology and security-s session discusses that grid provides the chance of a simple and transparent access to different information sources. In addition, the transformation between traditional versus smart grid networking trend and the IS importance on the communication field reflects the criticality of grid IS functional requirement identification is introduces. The smart grid IS functional requirements described in this paper are general and ...

Ling, Amy Poh Ai

2011-01-01T23:59:59.000Z

234

Aurora B phosphorylates spatially distinct targets to differentially regulate the kinetochore-microtubule interface  

E-Print Network [OSTI]

Accurate chromosome segregation requires carefully regulated interactions between kinetochores and microtubules, but how plasticity is achieved to correct diverse attachment defects remains unclear. Here we demonstrate ...

Welburn, Julie P. I.

235

Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402  

SciTech Connect (OSTI)

Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the Environmental Report is being evaluated at the Savannah River Site as a case study for application across the DOE Complex. This paper will present areas of direct correlation as well as those where the need for site specific data for either DOE operations or NRC compliance warrant additional interaction between the agencies. Areas where further refinement of the SMR technologies may drive collaborative development of revised regulations through such means as industry consensus standards will also be highlighted. Both NRC and DOE have requirements that mandate public involvement in their processes. The importance and value of early engagement with the public as well as collaborating regulatory agencies is of critical importance when deploying new technologies. (authors)

Chakraborti, Sayan [MRIGlobal, 425 Volker Blvd, Kansas City, MO 64110 (United States)] [MRIGlobal, 425 Volker Blvd, Kansas City, MO 64110 (United States); Stone, Lynn; Hyatt, Jeannette [Savannah River Nuclear Solutions (United States)] [Savannah River Nuclear Solutions (United States)

2013-07-01T23:59:59.000Z

236

Regulation of natural monopolies  

E-Print Network [OSTI]

This chapter provides a comprehensive overview of the theoretical and empirical literature on the regulation of natural monopolies. It covers alternative definitions of natural monopoly, regulatory goals, alternative ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

237

Regulations of Wells (Florida)  

Broader source: Energy.gov [DOE]

The Department of Environmental Protection regulates the construction, repair, and abandonment of wells, as well as the persons and businesses undertaking such practices. Governing boards of water...

238

Nuclear Regulation (Montana)  

Broader source: Energy.gov [DOE]

This statute establishes a regulatory program for sources of ionizing radiation, to be administered by the Montana Department of Health and Human Services. These regulations address permitting and...

239

Utility Regulation (Indiana)  

Broader source: Energy.gov [DOE]

The Indiana Utility Regulatory Commission enforces regulations in this legislation that apply to all individuals, corporations, companies, and partnerships that may own, operate, manage, or control...

240

Coal Mining Regulations (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation Title 405 chapters 1, 2, 3, 5, 7, 8, 10, 12, 16, 18 and 20 establish the laws governing coal mining in the state.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Wumpus Advisor 1: A First Implementation Program that Tutors Logical and Probabilistic Reasoning Skills  

E-Print Network [OSTI]

The Wumpus Advisor program offers advice to a player involved in choosing the best move in a game for which competence in dealing with incomplete and uncertain knowledge is required. The design and implementation of ...

Stansfield, James L.

1976-10-01T23:59:59.000Z

242

Determining the Capacity Value of Wind: An Updated Survey of Methods and Implementation; Preprint  

SciTech Connect (OSTI)

This paper summarizes state and regional studies examining the capacity value of wind energy, how different regions define and implement capacity reserve requirements, and how wind energy is defined as a capacity resource in those regions.

Milligan, M.; Porter, K.

2008-06-01T23:59:59.000Z

243

Implementation of a Cloud Radiative Adjustment Method to Change the Climate Sensitivity of CAM3  

E-Print Network [OSTI]

Conducting probabilistic climate projections with a particular climate model requires the ability to vary the model’s characteristics, such as its climate sensitivity. In this study, we implement and validate a method to ...

Sokolov, Andrei P.

244

Resources on Implementing Energy Savings Performance Contracts  

Broader source: Energy.gov [DOE]

Many resources are available to help Federal agencies implement energy savings performance contracts (ESPCs).

245

Nutritional requirements of sesame  

E-Print Network [OSTI]

L)&RARYi ~st t~6~ 0F TEXACO NUTRITIONAL REQUIREMENTS OF SESAME A Thesis By JOE C. ELLER Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in. partial fulfillment of the requirements for the degree of M... AS TER 0 F SCIENC E January 1958 Major Subject: Agronomy NUTRITIONAL REQUIREMENTS OF SESAME A Thesis JOE C. ELLER Approved. as to style and content by. ' Chairman of Committee Head qg Department January 1958 ACKNOWLEDGEMENT The author wishes...

Eller, Joe C

1958-01-01T23:59:59.000Z

246

Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs. Draft revision  

SciTech Connect (OSTI)

Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS`s program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives.

Peterson, G.L. [comp.

1993-11-18T23:59:59.000Z

247

Cyber Security Requirements for Wireless Devices and Information Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice establishes DOE policy requirements and responsibilities for using wireless networks and devices within DOE and implements the requirements of DOE 0 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, including requirements for cyber resource protection, risk management, program evaluation, and cyber security plan development and maintenance. No cancellation. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

2004-02-11T23:59:59.000Z

248

Required Annual Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent...

249

Transuranic Waste Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

1999-07-09T23:59:59.000Z

250

Spin switches for compact implementation of neuron and synapse  

SciTech Connect (OSTI)

Nanomagnets driven by spin currents provide a natural implementation for a neuron and a synapse: currents allow convenient summation of multiple inputs, while the magnet provides the threshold function. The objective of this paper is to explore the possibility of a hardware neural network implementation using a spin switch (SS) as its basic building block. SS is a recently proposed device based on established technology with a transistor-like gain and input-output isolation. This allows neural networks to be constructed with purely passive interconnections without intervening clocks or amplifiers. The weights for the neural network are conveniently adjusted through analog voltages that can be stored in a non-volatile manner in an underlying CMOS layer using a floating gate low dropout voltage regulator. The operation of a multi-layer SS neural network designed for character recognition is demonstrated using a standard simulation model based on coupled Landau-Lifshitz-Gilbert equations, one for each magnet in the network.

Quang Diep, Vinh, E-mail: vdiep@purdue.edu; Sutton, Brian; Datta, Supriyo [School of Electrical and Computer Engineering, Purdue University, West Lafayette, Indiana 47907 (United States); Behin-Aein, Behtash [GLOBALFOUNDRIES, Inc., Sunnyvale, California 94085 (United States)

2014-06-02T23:59:59.000Z

251

Workshop in Regulation &  

E-Print Network [OSTI]

Smart Grid and Regulatory Issues April 1, 2011 K&L Gates LLP, 1601 K Street, NW, Washington, DC Viable Regulation." Victor Glass, NECA, Comments January 14, 2011 Smart Grid and Regulatory Issues Location: Rutgers, The Brattle Group, "Smart Grid/Smart Regulation" John Caldwell, EEI, "Economic Efficiency and the Smart Grid

Lin, Xiaodong

252

Implementing 10 CFR Part 830 Subpart B at WIPP  

SciTech Connect (OSTI)

Implementation of Title 10 Code of Federal Regulations Part 830, Subpart B Nuclear Safety Management (1) was accomplished at the Waste Isolation Pilot Plant (WIPP) in a timely and efficient manner. The primary reason the transition went smoothly was that the existing safety analysis was relatively new, initially developed in 1995, and written in accordance with the safe harbor document DOE-STD-3009 (2). The WIPP Safety Analysis Report (SAR) (3) is kept up-to-date with the unreviewed safety question (USQ) process and thorough oversight and input provided by DOE-Carlsbad Field Office (CBFO) documented in the annual safety evaluation report (SER) process.

McCormick, J.; Ortiz, C.; Carter, M.; Niemi, B.; Farrell, R.

2002-02-26T23:59:59.000Z

253

Sodium-Bearing Waste Treatment Alternatives Implementation Study  

SciTech Connect (OSTI)

The purpose of this document is to discuss issues related to the implementation of each of the five down-selected INEEL/INTEC radioactive liquid waste (sodium-bearing waste - SBW) treatment alternatives and summarize information in three main areas of concern: process/technical, environmental permitting, and schedule. Major implementation options for each treatment alternative are also identified and briefly discussed. This report may touch upon, but purposely does not address in detail, issues that are programmatic in nature. Examples of these include how the SBW will be classified with respect to the Nuclear Waste Policy Act (NWPA), status of Waste Isolation Pilot Plant (WIPP) permits and waste storage availability, available funding for implementation, stakeholder issues, and State of Idaho Settlement Agreement milestones. It is assumed in this report that the SBW would be classified as a transuranic (TRU) waste suitable for disposal at WIPP, located in New Mexico, after appropriate treatment to meet transportation requirements and waste acceptance criteria (WAC).

Charles M. Barnes; James B. Bosley; Clifford W. Olsen

2004-07-01T23:59:59.000Z

254

High School if required  

E-Print Network [OSTI]

Chemistry II CHEM AP 4-5 Lab required @ UNLV; contact Chemistry PHYS 182 & 182L Engineering Physics III PHYS General Chemistry I CHEM AP 3 Lab required @ UNLV; contact Chemistry CHEM 241 Organic Chemistry I & CHEM 347 Lab Techniques of Organic Chem I CHEM 242 Organic Chemistry II & CHEM 348 Lab Techniques

Walker, Lawrence R.

255

Implementing the Corrective Action Management Unit at Sandia National Laboratories, New Mexico  

SciTech Connect (OSTI)

In September 1997, following significant public and regulator interaction, Sandia Corporation (Sandia) was granted a Resource Conservation and Recovery Act (RCRA) and Hazardous Solid Waste Amendment (HSWA) permit modification allowing construction and operation of a Correction Action Management Unit (CAMU). The CAMU follows recent regulatory guidance that allows for cost-effective, expedient cleanup of contaminated sites and management of hazardous remediation wastes. The CAMU was designed to store, treat, and provide long-term management for Environmental Restoration (ER) derived wastes. The 154 square meter CAMU site at Sandia National Laboratories, New Mexico (SNL/NM), includes facilities for storing bulk soils and containerized wastes, for treatment of bulk soils, and has a containment cell for long-term disposition of waste. Proposed treatment operations include soil washing and low temperature thermal desorption. The first waste was accepted into the CAMU for temporary storage in January 1999. Construction at the CAMU was completed in March 1999, and baseline monitoring of the containment cell has commenced. At completion of operations the facility will be closed, the waste containment cell will be covered, and long-term post-closure monitoring will begin. Sandia's CAMU is the only such facility within the US Department of Energy (DOE) complex. Implementing this innovative approach to ER waste management has required successful coordination with community representatives, state and federal regulators, the DOE, Sandia corporate management, and contractors. It is expected that cost savings to taxpayers will be significant. The life-cycle CAMU project cost is currently projected to be approximately $12 million.

MOORE,DARLENE R.; SCHRADER,SCOTT A.; KING,GABRIEL G.; CORMIER,JOHN

2000-01-26T23:59:59.000Z

256

Environmental regulations handbook for enhanced oil recovery  

SciTech Connect (OSTI)

This handbook is intended to assist owners and operators of enhanced oil recovery (EOR) operations in acquiring some introductory knowledge of the various state agencies, the US Environmental Protection Agency, and the many environmental laws, rules and regulations which can have jurisdiction over their permitting and compliance activities. It is a compendium of summarizations of environmental rules. It is not intended to give readers specific working details of what is required from them, nor can it be used in that manner. Readers of this handbook are encouraged to contact environmental control offices nearest to locations of interest for current regulations affecting them.

Madden, M.P. [National Inst. for Petroleum and Energy Research, Bartlesville, OK (United States); Blatchford, R.P.; Spears, R.B. [Spears and Associates, Inc., Tulsa, OK (United States)

1991-12-01T23:59:59.000Z

257

Inequality and the Politics of Social Policy Implementation: Gender, Age and Chile's 2004 Health Reforms  

E-Print Network [OSTI]

Reforms CHRISTINA EWIG and GASTO´ N A. PALMUCCI * University of Wisconsin-Madison, USA Summary implementation. We examine the 2004 Chilean health reforms that sought to regulate private insurers, and measure their effects on gender and age inequality. We find that reforms intended to decrease these inequalities largely

Wisconsin at Madison, University of

258

IMPLEMENTING PUBLIC PLATFORMS FOR MOBILE PHONE CONTENT SERVICES: STANDARDIZATION IN AN ERA OF  

E-Print Network [OSTI]

IMPLEMENTING PUBLIC PLATFORMS FOR MOBILE PHONE CONTENT SERVICES: STANDARDIZATION IN AN ERA@ifi.uio.no Abstract Mobile Telecommunication standardization in Europe builds on a history formed by European and International standardization bodies, the governments as regulators and the R&D departments of PPT

Sahay, Sundeep

259

A Digitally Implemented Photovoltaic Simulator with a Double Current Mode Controller  

E-Print Network [OSTI]

-DC converter-based photovoltaic (PV) simulator which emulates the output characteristics of a real solar panel data and a double current mode controller that regulates output current is implemented. In particular, the PV simulator designed is portable and has a maximum output power of 85W. The control

Kimball, Jonathan W.

260

Methods, systems and apparatus for synchronous current regulation of a five-phase machine  

DOE Patents [OSTI]

Methods, systems and apparatus are provided for controlling operation of and regulating current provided to a five-phase machine when one or more phases has experienced a fault or has failed. In one implementation, the disclosed embodiments can be used to synchronously regulate current in a vector controlled motor drive system that includes a five-phase AC machine, a five-phase inverter module coupled to the five-phase AC machine, and a synchronous current regulator.

Gallegos-Lopez, Gabriel; Perisic, Milun

2012-10-09T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Design and Implementation of an Underlay Control Channel for Cognitive Radios  

SciTech Connect (OSTI)

Implementation of any cognitive radio network requires an effective control channel that can operate under various modes of activity from the primary users. This paper reports the design and implementation of a filter bank multicarrier spread spectrum (FBMC-SS) system for use as the control channel in cognitive radio networks. The proposed design is based on a filtered multitone (FMT) implementation. Carrier and timing acquisition and tracking methods as well as a blind channel estimation method are developed for the proposed control channel. We also report an implementation of the proposed FBMC-SS system on a hardware platform; a FlexRIO FPGA module from National Instruments.

Daryl Wasden; Hussein Moradi; Behrouz Farhang-Boroujeny

2012-11-01T23:59:59.000Z

262

Cyber Security Process Requirements Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes the minimum implementation standards for cyber security management processes throughout the Department. No cancellation.

2008-08-12T23:59:59.000Z

263

Design and implementation of a departmental information management system  

E-Print Network [OSTI]

Management System (DBMS); 4. logical design; 5. physical design and 6. implementation. The following section brie y walks through each step [5]. The goals of the requirements analysis (Step 1) are to determine the data re- quirements of the database in terms... program, a degree program involves di erent documents. A Database Management System (DBMS) is computer software designed for the purpose of managing databases. Typical examples of DBMSs include Oracle, Microsoft SQL Server, and MySQL. Step 3 involves...

Xie, Dawen

2009-05-15T23:59:59.000Z

264

Single-Step Implementation of Universal Quantum Gates  

SciTech Connect (OSTI)

We construct optimized implementations of the controlled-NOT and other universal two-qubit gates that, unlike many of the previously proposed protocols, are carried out in a single step. The new protocols require tunable interqubit couplings but, in return, show a significant improvement in the quality of gate operations. We make specific predictions for coupled Josephson junction qubits and compare them with the results of recent experiments.

Grigorenko, I.A.; Khveshchenko, D.V. [Department of Physics and Astronomy, University of North Carolina, Chapel Hill, North Carolina 27599 (United States)

2005-09-09T23:59:59.000Z

265

Regulations and Procedures Manual  

E-Print Network [OSTI]

Quality Assurance and Conduct of Operations requirements forassurance and conduct- of-operations principles. These

Young, Lydia J.

2014-01-01T23:59:59.000Z

266

California Energy Commission ADOPTED REGULATIONS  

E-Print Network [OSTI]

California Energy Commission ADOPTED REGULATIONS FEBRUARY 2013 CEC-400-2010-004-CMF NONRESIDENTIAL BUILDING ENERGY USE DISCLOSURE PROGRAM Proposed Regulations: California Code of Regulations, Title 20, Division 2, Chapter 4, Article 9, Sections 1680 1685 CALIFORNIA ENERGY COMMISSION Edmund

267

Efficient implementation of the overlap operator on multi-GPUs  

E-Print Network [OSTI]

Lattice QCD calculations were one of the first applications to show the potential of GPUs in the area of high performance computing. Our interest is to find ways to effectively use GPUs for lattice calculations using the overlap operator. The large memory footprint of these codes requires the use of multiple GPUs in parallel. In this paper we show the methods we used to implement this operator efficiently. We run our codes both on a GPU cluster and a CPU cluster with similar interconnects. We find that to match performance the CPU cluster requires 20-30 times more CPU cores than GPUs.

Andrei Alexandru; Michael Lujan; Craig Pelissier; Ben Gamari; Frank X. Lee

2011-06-24T23:59:59.000Z

268

Transportation Infrastructure Requirement Resources  

Broader source: Energy.gov [DOE]

Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum...

269

BES Science Network Requirements  

E-Print Network [OSTI]

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

270

Timeline for Net Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

x By July 31 of each Forecast Year, BPA publishes all Load Following customers' Net Requirements data for the two years of the upcoming Rate Period. 17.6.1 7312010 Yes...

271

Selected Guidance & Requirements  

Broader source: Energy.gov [DOE]

This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

272

Promulgating Nuclear Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

1996-05-15T23:59:59.000Z

273

CASL - Implementing Integrated Steam Tables  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy, science, andAnalysis of Two-DimensionalImplementing

274

CASL - Implementing Integrated Steam Tables  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy, science, andAnalysis of Two-DimensionalImplementingLift

275

Conditions Required by Law  

E-Print Network [OSTI]

No No Sto H 2 NoIs it required by law "Violence on children"?164.512 (c) (1) H CE may disclose to government to LEO HCE may not disclose to LEO H No Yes No Required by law: "reporting certain type of injuries"? H disclose to LEO H 164.512 (f) (1) (ii) (C)(2) It provides that the request is specific and limited in scope

Khan, Javed I.

276

A National Forum on Demand Response: Results on What Remains to Be Done to Achieve Its Potential- Program Design and Implementation Working Group  

Broader source: Energy.gov [DOE]

In July 2011, the Federal Energy Regulatory Commission's (FERC) staff and the Department of Energy (DOE) jointly submitted to Congress a requiredImplementation Proposal for the National Action...

277

Sulfur Dioxide Regulations (Ohio)  

Broader source: Energy.gov [DOE]

This chapter of the law establishes that the Ohio Environmental Protection Agency provides sulfur dioxide emission limits for every county, as well as regulations for the emission, monitoring and...

278

Dam Safety Regulation (Mississippi)  

Broader source: Energy.gov [DOE]

The purpose of the Dam Safety Regulation is to ensure that all dams constructed in the state of Mississippi are permitted and thus do not potentially harm wildlife, water supplies and property. ...

279

Dam Safety Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

All dams, except those owned by the U.S., are under the jurisdiction of these regulations. These dams will be classified by hazard rating, and may be subject to periodic inspections. The...

280

Examining the Relationship Between Implementation and Student Outcomes: The Application of an Implementation Measurement Framework .  

E-Print Network [OSTI]

??The current study evaluated the implementation of evidence-based reading interventions using a multifaceted implementation measurement approach. Multilevel modeling was used to examine how three direct… (more)

Spear, Caitlin

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Hamiltonian gadgets with reduced resource requirements  

E-Print Network [OSTI]

Application of the adiabatic model of quantum computation requires efficient encoding of the solution to computational problems into the lowest eigenstate of a Hamiltonian that supports universal adiabatic quantum computation. Experimental systems are typically limited to restricted forms of 2-body interactions. Therefore, universal adiabatic quantum computation requires a method for approximating quantum many-body Hamiltonians up to arbitrary spectral error using at most 2-body interactions. Hamiltonian gadgets, introduced around a decade ago, offer the only current means to address this requirement. Although the applications of Hamiltonian gadgets have steadily grown since their introduction, little progress has been made in overcoming the limitations of the gadgets themselves. In this experimentally motivated theoretical study, we introduce several gadgets which require significantly more realistic control parameters than similar gadgets in the literature. We employ analytical techniques which result in a reduction of the resource scaling as a function of spectral error for the commonly used subdivision, 3- to 2-body and $k$-body gadgets. Accordingly, our improvements reduce the resource requirements of all proofs and experimental proposals making use of these common gadgets. Next, we numerically optimize these new gadgets to illustrate the tightness of our analytical bounds. Finally, we introduce a new gadget that simulates a $YY$ interaction term using Hamiltonians containing only $\\{X,Z,XX,ZZ\\}$ terms. Apart from possible implications in a theoretical context, this work could also be useful for a first experimental implementation of these key building blocks by requiring less control precision without introducing extra ancillary qubits.

Yudong Cao; Ryan Babbush; Jacob Biamonte; Sabre Kais

2015-01-20T23:59:59.000Z

282

Implementing CHP in Louisiana: A Case Study  

E-Print Network [OSTI]

researching current Federal and Louisiana state policies that regulate the air permitting and utility regulation for CHP systems. After the appropriate air permits and qualification for grid connection are identified, the next step in the process of solving...

Kozman, T. A.; Carriere, J. L.; Lee, J.

283

Level Set Implementations on Unstructured Point Cloud  

E-Print Network [OSTI]

Level Set Implementations on Unstructured Point Cloud by HO, Hon Pong A Thesis Submitted;Level Set Implementations on Unstructured Point Cloud by HO, Hon Pong This is to certify that I have implementations on unstructured point cloud 15 3.1 Level set initialization

Duncan, James S.

284

International Review of the Development and Implementation of Energy Efficiency Standards and Labeling Programs  

SciTech Connect (OSTI)

Appliance energy efficiency standards and labeling (S&L) programs have been important policy tools for regulating the efficiency of energy-using products for over 40 years and continue to expand in terms of geographic and product coverage. The most common S&L programs include mandatory minimum energy performance standards (MEPS) that seek to push the market for efficient products, and energy information and endorsement labels that seek to pull the market. This study seeks to review and compare some of the earliest and most well-developed S&L programs in three countries and one region: the U.S. MEPS and ENERGY STAR, Australia MEPS and Energy Label, European Union MEPS and Ecodesign requirements and Energy Label and Japanese Top Runner programs. For each program, key elements of S&L programs are evaluated and comparative analyses across the programs undertaken to identify best practice examples of individual elements as well as cross-cutting factors for success and lessons learned in international S&L program development and implementation. The international review and comparative analysis identified several overarching themes and highlighted some common factors behind successful program elements. First, standard-setting and programmatic implementation can benefit significantly from a legal framework that stipulates a specific timeline or schedule for standard-setting and revision, product coverage and legal sanctions for non-compliance. Second, the different MEPS programs revealed similarities in targeting efficiency gains that are technically feasible and economically justified as the principle for choosing a standard level, in many cases at a level that no product on the current market could reach. Third, detailed survey data such as the U.S. Residential Energy Consumption Survey (RECS) and rigorous analyses provide a strong foundation for standard-setting while incorporating the participation of different groups of stakeholders further strengthen the process. Fourth, sufficient program resources for program implementation and evaluation are critical to the effectiveness of standards and labeling programs and cost-sharing between national and local governments can help ensure adequate resources and uniform implementation. Lastly, check-testing and punitive measures are important forms of enforcement while the cancellation of registration or product sales-based fines have also proven effective in reducing non-compliance. The international comparative analysis also revealed the differing degree to which the level of government decentralization has influenced S&L programs and while no single country has best practices in all elements of standards and labeling development and implementation, national examples of best practices for specific elements do exist. For example, the U.S. has exemplified the use of rigorous analyses for standard-setting and robust data source with the RECS database while Japan?s Top Runner standard-setting principle has motivated manufacturers to exceed targets. In terms of standards implementation and enforcement, Australia has demonstrated success with enforcement given its long history of check-testing and enforcement initiatives while mandatory information-sharing between EU jurisdictions on compliance results is another important enforcement mechanism. These examples show that it is important to evaluate not only the drivers of different paths of standards and labeling development, but also the country-specific context for best practice examples in order to understand how and why certain elements of specific S&L programs have been effective.

Zhou, Nan; Zheng, Nina; Fridley, David

2012-02-28T23:59:59.000Z

285

Principle and implementations of a refracto-nephelo-turbidi-meter for  

E-Print Network [OSTI]

1 Principle and implementations of a refracto-nephelo-turbidi-meter for seawater measurements B of physical oceanography requires a compact high-resolution in-situ salino-turbidi-meter to measure these two the requirements and challenges of refracto-turbidi-meter design from their measurement principles and correlations

Paris-Sud XI, Université de

286

Implementation of the Deutsch Jozsa algorithm on an ion-trap  

E-Print Network [OSTI]

.............................................................. Implementation of the Deutsch­ Jozsa on both sides) requires an examination of each side. However, the analogous quantum procedure (the Deutsch­Jozsa algorithm1,2 ) requires just one examination step. The Deutsch­Jozsa algorithm has been real- ized

Blatt, Rainer

287

SB 4 Well Stimulation Treatment Regulations Text of Proposed Regulations  

E-Print Network [OSTI]

surveys; routine activities that do not affect the integrity of the well or the formation; the removal SB 4 Well Stimulation Treatment Regulations Text of Proposed Regulations Page 1 of 13 SB 4 WELL STIMULATION TREATMENT REGULATIONS TEXT OF PROPOSED REGULATIONS Added text is shown in underline

288

Safeguards and security requirements for weapons plutonium disposition in light water reactors  

SciTech Connect (OSTI)

This paper explores the issues surrounding the safeguarding of the plutonium disposition process in support of the United States nuclear weapons dismantlement program. It focuses on the disposition of the plutonium by burning mixed oxide fuel in light water reactors (LWR) and addresses physical protection, material control and accountability, personnel security and international safeguards. The S and S system needs to meet the requirements of the DOE Orders, NRC Regulations and international safeguards agreements. Experience has shown that incorporating S and S measures into early facility designs and integrating them into operations provides S and S that is more effective, more economical, and less intrusive. The plutonium disposition safeguards requirements with which the US has the least experience are the implementation of international safeguards on plutonium metal; the large scale commercialization of the mixed oxide fuel fabrication; and the transportation to and loading in the LWRs of fresh mixed oxide fuel. It is in these areas where the effort needs to be concentrated if the US is to develop safeguards and security systems that are effective and efficient.

Thomas, L.L.; Strait, R.S. [Lawrence Livermore National Lab., CA (United States). Fission Energy and Systems Safety Program

1994-10-01T23:59:59.000Z

289

Implementation of Endomorphisms of the CAR Algebra  

E-Print Network [OSTI]

The implementation of non-surjective Bogoliubov transformations in Fock states over CAR algebras is investigated. Such a transformation is implementable by a Hilbert space of isometries if and only if the well-known Shale-Stinespring condition is met. In this case, the dimension of the implementing Hilbert space equals the square root of the Watatani index of the associated inclusion of CAR algebras, and both are determined by the Fredholm index of the corresponding one-particle operator. Explicit expressions for the implementing operators are obtained, and the connected components of the semigroup of implementable transformations are described.

Carsten Binnenhei

1997-01-10T23:59:59.000Z

290

Diamond turning machine controller implementation  

SciTech Connect (OSTI)

The standard controller for a Pnuemo ASG 2500 Diamond Turning Machine, an Allen Bradley 8200, has been replaced with a custom high-performance design. This controller consists of four major components. Axis position feedback information is provided by a Zygo Axiom 2/20 laser interferometer with 0.1 micro-inch resolution. Hardware interface logic couples the computers digital and analog I/O channels to the diamond turning machine`s analog motor controllers, the laser interferometer, and other machine status and control information. It also provides front panel switches for operator override of the computer controller and implement the emergency stop sequence. The remaining two components, the control computer hardware and software, are discussed in detail below.

Garrard, K.P.; Taylor, L.W.; Knight, B.F.; Fornaro, R.J.

1988-12-01T23:59:59.000Z

291

Energy efficient sensor network implementations  

SciTech Connect (OSTI)

In this paper, we discuss a low power embedded sensor node architecture we are developing for distributed sensor network systems deployed in a natural environment. In particular, we examine the sensor node for energy efficient processing-at-the-sensor. We analyze the following modes of operation; event detection, sleep(wake-up), data acquisition, data processing modes using low power, high performance embedded technology such as specialized embedded DSP processors and a low power FPGAs at the sensing node. We use compute intensive sensor node applications: an acoustic vehicle classifier (frequency domain analysis) and a video license plate identification application (learning algorithm) as a case study. We report performance and total energy usage for our system implementations and discuss the system architecture design trade offs.

Frigo, Janette R [Los Alamos National Laboratory; Raby, Eric Y [Los Alamos National Laboratory; Brennan, Sean M [Los Alamos National Laboratory; Kulathumani, Vinod [WEST VIRGINIA UNIV.; Rosten, Ed [CAMBRIDGE UNIV.; Wolinski, Christophe [IRISA; Wagner, Charles [IRISA; Charot, Francois [IRISA

2009-01-01T23:59:59.000Z

292

Used fuel disposition campaign international activities implementation plan.  

SciTech Connect (OSTI)

The management of used nuclear fuel and nuclear waste is required for any country using nuclear energy. This includes the storage, transportation, and disposal of low and intermediate level waste (LILW), used nuclear fuel (UNF), and high level waste (HLW). The Used Fuel Disposition Campaign (UFDC), within the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE), Office of Fuel Cycle Technology (FCT), is responsible for conducting research and development pertaining to the management of these materials in the U.S. Cooperation and collaboration with other countries would be beneficial to both the U.S. and other countries through information exchange and a broader participation of experts in the field. U.S. participation in international UNF and HLW exchanges leads to safe management of nuclear materials, increased security through global oversight, and protection of the environment worldwide. Such interactions offer the opportunity to develop consensus on policy, scientific, and technical approaches. Dialogue to address common technical issues helps develop an internationally recognized foundation of sound science, benefiting the U.S. and participating countries. The UNF and HLW management programs in nuclear countries are at different levels of maturity. All countries utilizing nuclear power must store UNF, mostly in wet storage, and HLW for those countries that reprocess UNF. Several countries either utilize or plan to utilize dry storage systems for UNF, perhaps for long periods of time (several decades). Geologic disposal programs are at various different states, ranging from essentially 'no progress' to selected sites and pending license applications to regulators. The table below summarizes the status of UNF and HLW management programs in several countriesa. Thus, the opportunity exists to collaborate at different levels ranging from providing expertise to those countries 'behind' the U.S. to obtaining access to information and expertise from those countries with more mature programs. The U.S. fuel cycle is a once through fuel cycle involving the direct disposal of UNF, as spent nuclear fuel, in a geologic repository (previously identified at Yucca Mountain, Nevada), following at most a few decades of storage (wet and dry). The geology at Yucca Mountain, unsaturated tuff, is unique among all countries investigating the disposal of UNF and HLW. The decision by the U.S. Department of Energy to no longer pursue the disposal of UNF at Yucca Mountain and possibly utilize very long term storage (approaching 100 years or more) while evaluating future fuel cycle alternatives for managing UNF, presents a different UNF and HLW management R&D portfolio that has been pursued in the U.S. In addition, the research and development activities managed by OCRWM have been transferred to DOE-NE. This requires a reconsideration of how the UFDC will engage in cooperative and collaborative activities with other countries. This report presents the UFDC implementation plan for international activities. The DOE Office of Civilian Radioactive Waste Management (OCRWM) has cooperated and collaborated with other countries in many different 'arenas' including the Nuclear Energy Agency (NEA) within the Organization for Economic Co-operation and Development (OECD), the International Atomic Energy Agency (IAEA), and through bilateral agreements with other countries. These international activities benefited OCRWM through the acquisition and exchange of information, database development, and peer reviews by experts from other countries. DOE-NE cooperates and collaborates with other countries in similar 'arenas' with similar objectives and realizing similar benefits. However the DOE-NE focus has not typically been in the area of UNF and HLW management. This report will first summarize these recent cooperative and collaborative activities. The manner that the UFDC will cooperate and collaborate in the future is expected to change as R&D is conducted regarding long-term storage and the potential disposal of UNF and HLW in different geolo

Nutt, W. M. (Nuclear Engineering Division)

2011-06-29T23:59:59.000Z

293

Implementation impacts of PRL methodology  

SciTech Connect (OSTI)

This report responds to a DOE-SR request to evaluate the impacts from implementation of the proposed Plutonium Recovery Limit (PRL) methodology. The PRL Methodology is based on cost minimization for decisions to discard or recover plutonium contained in scrap, residues, and other plutonium bearing materials. Implementation of the PRL methodology may result in decisions to declare as waste certain plutonium bearing materials originally considered to be a recoverable plutonium product. Such decisions may have regulatory impacts, because any material declared to be waste would immediately be subject to provisions of the Resource Conservation and Recovery Act (RCRA). The decision to discard these materials will have impacts on waste storage, treatment, and disposal facilities. Current plans for the de-inventory of plutonium processing facilities have identified certain materials as candidates for discard based upon the economic considerations associated with extending the operating schedules for recovery of the contained plutonium versus potential waste disposal costs. This report evaluates the impacts of discarding those materials as proposed by the F Area De-Inventory Plan and compares the De-Inventory Plan assessments with conclusions from application of the PRL. The impact analysis was performed for those materials proposed as potential candidates for discard by the De-Inventory Plan. The De-Inventory Plan identified 433 items, containing approximately 1% of the current SRS Pu-239 inventory, as not appropriate for recovery as the site moves to complete the mission of F-Canyon and FB-Line. The materials were entered into storage awaiting recovery as product under the Department`s previous Economic Discard Limit (EDL) methodology which valued plutonium at its incremental cost of production in reactors. An application of Departmental PRLs to the subject 433 items revealed that approximately 40% of them would continue to be potentially recoverable as product plutonium.

Caudill, J.A.; Krupa, J.F.; Meadors, R.E.; Odum, J.V.; Rodrigues, G.C.

1993-02-01T23:59:59.000Z

294

Regulations and Procedures Manual  

E-Print Network [OSTI]

Quality Assurance and Conduct of Operations requirements forquality assurance/conduct of operations performanceassurance and conduct of operations principles. These

Young, Lydia

2014-01-01T23:59:59.000Z

295

A game of climate chicken : can EPA regulate greenhouse gases before the U.S. Senate ratifies the Kyoto Protocol?  

E-Print Network [OSTI]

EPA's legal authority to regulate greenhouse gas emissions under the Clean Air Act is reviewed. While EPA clearly does not have the authority to implement the precise terms of the Kyoto Protocol, arguments could be put ...

Bugnion, Véronique.; Reiner, David M.

296

The institutional needs of joint implementation projects  

SciTech Connect (OSTI)

In this paper, the authors discuss options for developing institutions for joint implementation (JI) projects. They focus on the tasks which are unique to JI projects or require additional institutional needs--accepting the project by the host and investor countries and assessing the project`s greenhouse gas (GHG) emission reduction or sequestration--and they suggest the types of institutions that would enhance their performance. The evaluation is based on four sets of governmental and international criteria for JI projects, the experiences of ten pilot JI projects, and the perspectives of seven collaborating authors from China, Egypt, India, Mexico, and Thailand, who interviewed relevant government and non-government staff involved in JI issue assessment in their countries. After examining the roles for potential JI institutions, they present early findings arguing for a decentralized national JI structure, which includes: (1) national governmental panels providing host country acceptance of proposed JI projects; (2) project parties providing the assessment data on the GHG reduction or sequestration for the projects; (3) technical experts calculating these GHG flows; (4) certified verification teams checking the GHG calculations; and (5) members of an international JI Secretariat training and certifying the assessors, as well as resolving challenges to the verifications. 86 refs.

Watt, E.; Sathaye, J. [Lawrence Berkeley Lab., CA (United States); Buen, O. de; Masera, O. [National Univ. of Mexico, Mexico City (Mexico); Gelil, I.A. [Organization of Energy Conservation and Planning, Cairo (Egypt); Ravindranath, N.H. [Indian Inst. of Science, Bangalore (India); Zhou, D.; Li, J. [Energy Research Inst., Beijing (China); Intarapravich, D. [Thailand Environmental Inst., Bangkok (Thailand)

1995-10-21T23:59:59.000Z

297

Requirements Definition Stage  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

1997-05-21T23:59:59.000Z

298

Minor in Philosophy Requirements  

E-Print Network [OSTI]

2012-05-23 Minor in Philosophy Requirements: 1. 18 hours of work in philosophy with grades of C- or better. 2. A 2.0 grade point average for all work attempted in philosophy. 3. 9 hours of upper division work in philosophy, with grades of C- or better. 4. Completion of at least one course, with a grade

Stowell, Michael

299

Requirements for Xenon International  

SciTech Connect (OSTI)

This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

Hayes, James C.; Ely, James H.

2013-09-26T23:59:59.000Z

300

Lawrence Livermore National Laboratory Emergency Response Capability Baseline Needs Assessment Requirement Document  

SciTech Connect (OSTI)

This revision of the LLNL Fire Protection Baseline Needs Assessment (BNA) was prepared by John A. Sharry, LLNL Fire Marshal and LLNL Division Leader for Fire Protection and reviewed by Martin Gresho, Sandia/CA Fire Marshal. The document follows and expands upon the format and contents of the DOE Model Fire Protection Baseline Capabilities Assessment document contained on the DOE Fire Protection Web Site, but only address emergency response. The original LLNL BNA was created on April 23, 1997 as a means of collecting all requirements concerning emergency response capabilities at LLNL (including response to emergencies at Sandia/CA) into one BNA document. The original BNA documented the basis for emergency response, emergency personnel staffing, and emergency response equipment over the years. The BNA has been updated and reissued five times since in 1998, 1999, 2000, 2002, and 2004. A significant format change was performed in the 2004 update of the BNA in that it was 'zero based.' Starting with the requirement documents, the 2004 BNA evaluated the requirements, and determined minimum needs without regard to previous evaluations. This 2010 update maintains the same basic format and requirements as the 2004 BNA. In this 2010 BNA, as in the previous BNA, the document has been intentionally divided into two separate documents - the needs assessment (1) and the compliance assessment (2). The needs assessment will be referred to as the BNA and the compliance assessment will be referred to as the BNA Compliance Assessment. The primary driver for separation is that the needs assessment identifies the detailed applicable regulations (primarily NFPA Standards) for emergency response capabilities based on the hazards present at LLNL and Sandia/CA and the geographical location of the facilities. The needs assessment also identifies areas where the modification of the requirements in the applicable NFPA standards is appropriate, due to the improved fire protection provided, the remote location and low population density of some the facilities. As such, the needs assessment contains equivalencies to the applicable requirements. The compliance assessment contains no such equivalencies and simply assesses the existing emergency response resources to the requirements of the BNA and can be updated as compliance changes independent of the BNA update schedule. There are numerous NFPA codes and standards and other requirements and guidance documents that address the subject of emergency response. These requirements documents are not always well coordinated and may contain duplicative or conflicting requirements or even coverage gaps. Left unaddressed, this regulatory situation results in frequent interpretation of requirements documents. Different interpretations can then lead to inconsistent implementation. This BNA addresses this situation by compiling applicable requirements from all identified sources (see Section 5) and analyzing them collectively to address conflict and overlap as applicable to the hazards presented by the LLNL and Sandia/CA sites (see Section 7). The BNA also generates requirements when needed to fill any identified gaps in regulatory coverage. Finally, the BNA produces a customized simple set of requirements, appropriate for the DOE protection goals, such as those defined in DOE O 420.1B, the hazard level, the population density, the topography, and the site layout at LLNL and Sandia/CA that will be used as the baseline requirements set - the 'baseline needs' - for emergency response at LLNL and Sandia/CA. A template approach is utilized to accomplish this evaluation for each of the nine topical areas that comprise the baseline needs for emergency response. The basis for conclusions reached in determining the baseline needs for each of the topical areas is presented in Sections 7.1 through 7.9. This BNA identifies only mandatory requirements and establishes the minimum performance criteria. The minimum performance criteria may not be the level of performance desired Lawrence Livermore National Laboratory or Sandia/CA

Sharry, J A

2009-12-30T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Implementation Guide for DOE Fire Protection and Emergency Services Programs for Use with DOE O 420.1B, Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide facilitates the implementation of requirements of DOE O 420.1B by providing an acceptable approach to meet the requirements for Fire Protection Programs. Cancels DOE G 440.1-5.

2007-09-27T23:59:59.000Z

302

Price regulation for waste hauling franchises in California: an examination of how regulators regulate pricing and the effects of competition on regulated markets  

E-Print Network [OSTI]

and popular recent “incentive regulation” alternatives,if costs increase. Incentive regulation – most particularly

Seltzer, Steven A.

2011-01-01T23:59:59.000Z

303

Westinghouse Hanford Company quality assurance program and implementation plan  

SciTech Connect (OSTI)

This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time periodthrough March 1996, to implement the actions. The costs were allassociated with the actions on training ($300K) and configurationmanagement, design bases, and drawings ($1.4M). Schedulardetails and compensatory measures for the action items areprovided in Appendices A and D to this document.

Moss, S.S., Westinghouse Hanford

1996-07-01T23:59:59.000Z

304

High level waste storage tanks 242-A evaporator standards/requirement identification document  

SciTech Connect (OSTI)

This document, the Standards/Requirements Identification Document (S/RIDS) for the subject facility, represents the necessary and sufficient requirements to provide an adequate level of protection of the worker, public health and safety, and the environment. It lists those source documents from which requirements were extracted, and those requirements documents considered, but from which no requirements where taken. Documents considered as source documents included State and Federal Regulations, DOE Orders, and DOE Standards

Biebesheimer, E.

1996-01-01T23:59:59.000Z

305

Reassignment of boundaries requiring personal dosimetry at a nuclear facility  

E-Print Network [OSTI]

for monitoring in 10CFR20. In fact, one insurer of nuclear facilities recommends that "occupational exposures, no matter how small, should be monitored and documented for claims evaluation purposes" (ANI 1986). This results from the theory that the nuclear... of Advisory Committee: Dr. John W. Poston Although the federal regulations do not require personnel monitoring for external exposure of all radiation workers, many nuclear facilities provide dosimetry to individuals who do not meet the minimum requirements...

Fulmer, Philip Clark

2012-06-07T23:59:59.000Z

306

Westinghouse Hanford Company (WHC) standards/requirements identification document (S/RID)  

SciTech Connect (OSTI)

This Standards/Requirements Identification Document (S/RID) set forth the Environmental Safety and Health (ES&H) standards/requirements for Westinghouse Hanford Company Level Programs, where implementation and compliance is the responsibility of these organizations. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

Bennett, G.L.

1996-03-15T23:59:59.000Z

307

Cyber Security Process Requirements Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes the minimum implementation standards for cyber security management processes throughout the Department. No cancellation. Admin Chg 1 dated 9-1-09.

2008-08-12T23:59:59.000Z

308

Sandia National Laboratories, Livermore Environmental Protection Implementation Plan for the period November 9, 1991--November 9, 1992  

SciTech Connect (OSTI)

Sandia National Laboratories, as part of the DOE complex, is committed to full compliance with all applicable environmental laws and regulations. This Environmental Protection Implementation Plan (EPIP) is intended to ensure that the environmental program objectives of DOE Order 5400.1 are achieved at SNL, Livermore. The EPIP will serve as an aid to management and staff to implement these new programs in a timely manner. 23 refs., 4 figs., 1 tab.

Not Available

1991-10-01T23:59:59.000Z

309

LEGACY MANAGEMENT REQUIRES INFORMATION  

SciTech Connect (OSTI)

''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

CONNELL, C.W.; HILDEBRAND, R.D.

2006-12-14T23:59:59.000Z

310

BER Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

311

Regulated water production to control water coning in oil wells  

E-Print Network [OSTI]

REGULATED WATER PRODUCTION TO CONTROL WATER CONING IN OIL WELLS A Thesis by ISHWAR SINGH Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1975 Major... Subject: Petroleum Engineering REGULATED WATER PRODUCTION TO CONTROL WATER CONING IN OIL WELLS A Thesis by ISHWAR SINGH Approved as to style and content by (Chairman of Committee) (Membe ) (Head of Departmen lVlemb ) May 1975 ( I ABST RACT...

Sim?ha, I?s?vara

1975-01-01T23:59:59.000Z

312

Requirements for Computer Based-Procedures for Nuclear Power Plant Field Operators Results from a Qualitative Study  

SciTech Connect (OSTI)

Although computer-based procedures (CBPs) have been investigated as a way to enhance operator performance on procedural tasks in the nuclear industry for almost thirty years, they are not currently widely deployed at United States utilities. One of the barriers to the wide scale deployment of CBPs is the lack of operational experience with CBPs that could serve as a sound basis for justifying the use of CBPs for nuclear utilities. Utilities are hesitant to adopt CBPs because of concern over potential costs of implementation, and concern over regulatory approval. Regulators require a sound technical basis for the use of any procedure at the utilities; without operating experience to support the use CBPs, it is difficult to establish such a technical basis. In an effort to begin the process of developing a technical basis for CBPs, researchers at Idaho National Laboratory are partnering with industry to explore CBPs with the objective of defining requirements for CBPs and developing an industry-wide vision and path forward for the use of CBPs. This paper describes the results from a qualitative study aimed at defining requirements for CBPs to be used by field operators and maintenance technicians.

Katya Le Blanc; Johanna Oxstrand

2012-05-01T23:59:59.000Z

313

Schedule optimization study implementation plan  

SciTech Connect (OSTI)

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

314

Assessing and Implementing LTS&M Requirements for Remediation Sites Under  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical Challenges toReport | Department ofDepartment

315

Implementation of a Cyber Secure Control System, Critical Elements, Requirements and Controls  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe U.S. Department-2023 Idaho4FuelImplementationto:Major

316

The Waste Management Quality Assurance Implementing Management Plan (QAIMP)  

E-Print Network [OSTI]

DIVISION Waste Management Quality Assurance ImplementingI I IMPLEMENTING MANAGEMENT QUALITY PLAN ASSURANCE I lilillI WM-QAIMP Waste Management Quality Assurance Implementing

Albert editor, R.

2009-01-01T23:59:59.000Z

317

CRAD, Chemical Management Implementation - June 30, 2011 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Chemical Management Implementation - June 30, 2011 CRAD, Chemical Management Implementation - June 30, 2011 June 30, 2011 Chemical Management Implementation Inspection Criteria,...

318

UMTRA project technical assistance contractor quality assurance implementation plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

Not Available

1994-03-01T23:59:59.000Z

319

Central Technical Authority Responsibilities Regarding Nuclear Safety Requirements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes Central Technical Authority and Chief of Nuclear Safety/Chief of Defense Nuclear Safety responsibilities and requirements directed by the Secretary of Energy in the development and issuance of Department of Energy regulations and directives that affect nuclear safety. No cancellations.

2007-08-28T23:59:59.000Z

320

INTRODUCTION Requirements to monitor the effects of potentially environ-  

E-Print Network [OSTI]

the boundaries of which major deposits of uranium are subject to current and proposed mining activities. PerhapsINTRODUCTION Requirements to monitor the effects of potentially environ- mentally damaging mining well-regulated mining activity has left a legacy of discharged acidic and metallic wastes to several

Cranston, Peter S.

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Page 1 of 8 POULTRY HEALTH REQUIREMENTS FOR ADMISSION TO  

E-Print Network [OSTI]

Page 1 of 8 POULTRY HEALTH REQUIREMENTS FOR ADMISSION TO MARYLAND FAIRS AND SHOWS - 2005 N. G@mda.state.md.us 1. What are the regulations on Avian Influenza testing? · Poultry must come from flocks that participate in the U.S. National Poultry Improvement Plan Certified Avian Influenza-Free Program (Sample

Hamza, Iqbal

322

Design of Optimal Regulators  

E-Print Network [OSTI]

Current research suggests the use of a liner quadratic performance index for optimal control of regulators in various applications. Some examples include correcting the trajectory of rocket and air vehicles, vibration suppression of flexible structures, and airplane stability. In all these cases, the focus is in suppressing/decreasing system deviations rapidly. However, if one compares the Linear Quadratic Regulator (LQR) solution with optimal solutions (minimum time), it is seen that the LQR solution is less than optimal in some cases indeed (3-6) times that obtained using a minimum time solution. Moreover, the LQR solution is sometimes unacceptable in practice due to the fact that values of control extend beyond admissible limits and thus the designer must choose coefficients in the linear quadratic form, which are unknown. The authors suggest methods which allow finding a quasi-optimal LQR solution with bounded control which is closed to the minimum time solution. They also remand the process of the minimum time decision. Keywords: Optimal regulator, minimum time controller, Linear Quadratic Regulator (LQR). -- This paper is declared a work of the U.S. Government and not subject to copyright protection in the USA. The manuscript is accepted as paper AIAA-2003-6638 by 2nd AIAA Unmanned Unlimited Systems, Technologies, and Operations-Aerospace, Land, and See Conference and Workshop - Exhibit, San Diego, California, USA, 15-18 Sep. 2003.

Alexander Bolonkin; Robert Sierakowski

2007-01-19T23:59:59.000Z

323

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

324

Emissions Scenarios, Costs, and Implementation Considerations of REDD Programs  

SciTech Connect (OSTI)

Greenhouse gas emissions from the forestry sector are estimated to be 8.4 GtCO2-eq./year or about 17percent of the global emissions. We estimate that the cost forreducing deforestation is low in Africa and several times higher in Latin America and Southeast Asia. These cost estimates are sensitive to the uncertainties of how muchunsustainable high-revenue logging occurs, little understood transaction and program implementation costs, and barriers to implementation including governance issues. Due to lack of capacity in the affected countries, achieving reduction or avoidance of carbon emissions will require extensive REDD-plus programs. Preliminary REDD-plus Readiness cost estimates and program descriptions for Indonesia, Democratic Republic of the Congo, Ghana, Guyana and Mexico show that roughly one-third of potential REDD-plus mitigation benefits might come from avoided deforestation and the rest from avoided forest degradation and other REDD-plus activities.

Sathaye, Jayant; Andrasko, Ken; Chan, Peter

2011-04-11T23:59:59.000Z

325

GUIDANCE REGARDING NEPA REGULATIONS  

Office of Environmental Management (EM)

policies of the involved agencies. Examples of these requirements include the Fish and Wildlife Coordination Act, the Clean Air Act, the Endangered Species Act, the...

326

A successful implementation of total quality management into a feedlot situation  

E-Print Network [OSTI]

A SUCCESSFUL IMPLEMENTATION OF TOTAL QUALITY MANAGEMENT INTO A FEEDYARD SITUATION A Professional Paper by Andrew Lee Murphy Submitted to the College of Agriculture and Life Sciences of Texas Alt-. M University in partial fulfillment... of the requirements for the degree of MASTER OF AGRICULTURE May 1995 Department of Animal Science Beef Cattle Science Section A SUCCESSFUL IMPLEMENTATION OF TOTAL QUALITY MANAGEMENT INTO A FEEDYARD SITUATION A Professional Paper by Andrew Lee Murphy...

Murphy, Andrew Lee

1995-01-01T23:59:59.000Z

327

Standard cell implementation of a micro-control unit for a prolog unification coprocessor  

E-Print Network [OSTI]

STANDARD CELL IMPLEMENTATION OF A MICRO-CONTROl UNIT FOR A PROLOG UNIFICATION COPROCESSOR A Thesis by HABIBOLLAH GOLNABI Submitted to the Graduate College of Texas ARM University in partial fulfillment of the requirement for the degree... of MASTER OF SCIENCE May 1988 Major Subject: Electrical Engineering STANDARD CELL IMPLEMENTATION OF A MICRO-CONTROL UNIT FOR A PROLOG UNIFICATION COPROCESSOR A Thesis by HABIBOLLAH GOLNABI Approved as to style and content by: Karan Watson (Chairman...

Golnabi, Habibollah

1988-01-01T23:59:59.000Z

328

US weapons-useable plutonium disposition policy: implementation of the MOX fuel option  

E-Print Network [OSTI]

US WEAPONS-USEABLE PLUTONIUM DISPOSITION POLICY: IMPLEMENTATION OF THE MOX FUEL OPTION A Thesis by VANESSA L. GONZALEZ Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements... for the degree of MASTER OF ARTS August 1998 Major Subject: Political Science US WEAPONS-USEABLE PLUTONIUM DISPOSITION POLICY: IMPLEMENTATION OF THE MOX FUEL OPTION A Thesis by VANESSA L. GONZALEZ Submitted to Texas ARM University in partial fulfillment...

Gonzalez, Vanessa L

2012-06-07T23:59:59.000Z

329

A hierarchical structure of neural network implemented for the recognition of automobile license plate number  

E-Print Network [OSTI]

A HIERARCHICAL STRUCTURE OF NEURAL NETWORK IMPLEMENTED FOR THE RECOGNITION OF AUTOMOBILE LICENSE PLATE NURSER A Thesis by JOONGHO CHANG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfdlment... of the requirements for the degree of MASTER OF SCIENCE August 1994 Major Subject: Electrical Engineering A HIERARCHICAL STRUCTURE OF NEURAL NETWORK IMPLEMENTED FOR THE RECOGNITION OF AUTOMOBILE LICENSE PLATE NUMBER A Thesis by JOONGHO CHANG Submitted...

Chang, Joongho

1994-01-01T23:59:59.000Z

330

Design, development, and analysis of processing elements for VLSI implemented MIMD computer system  

E-Print Network [OSTI]

DESIGN, DEVELOPMENT, AND ANALYSIS OF PROCESSING ELEMENTS FOR VLSI IMPLEMENTED MIMD COMPUTER SYSTEM A Thesis by BRANDON THAYER WALDO Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE May 199'2 Major Subject: Electrical Engineering DESIGN, DEVELOPMENT, AND ANALYSIS OF PROCESSING ELEMENTS FOR VLSI IMPLEMENTED MIMD COMPHTER SYSTEM A Thesis by BRANDON THAYER WALDO Approved as to style and content by...

Waldo, Brandon Thayer

2012-06-07T23:59:59.000Z

331

Improved Audit Implementation Through Programmed Report Delivery  

E-Print Network [OSTI]

Studies of energy audit recommendations have identified four primary barriers to implementation, perceived process interference, finances, organizational changes, and knowledge limitations leading to a bias against innovative technologies...

Brown, M. L.; Gurta, M. E.; Meffert, W. A.

332

Implementation of Department of Energy Oversight Policy  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order implements the policy that establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement.

2011-04-25T23:59:59.000Z

333

Criticality Safety Controls Implementation Inspection Criteria...  

Broader source: Energy.gov (indexed) [DOE]

Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls...

334

Implementation of motion capture support in smartphones.  

E-Print Network [OSTI]

??This thesis investigates the feasibility of developing cross-platform smart phone applications that utilize the Qualisys motion capture system. An Application Programming Interface that implements an… (more)

Martinsson, Johannes

2010-01-01T23:59:59.000Z

335

Mid-Blend Ethanol Fuels ? Implementation Perspectives  

Broader source: Energy.gov (indexed) [DOE]

Blend Ethanol Fuels - Implementation Perspectives William Woebkenberg - US Fuels Technical and Regulatory Affairs Mercedes-Benz Research & Development North America July 25, 2013...

336

State Energy Program: Kentucky Implementation Model Resources  

Broader source: Energy.gov [DOE]

Below are resources associated with the U.S. Department of Energy's Weatherization and Intergovernmental Programs Office State Energy Program Kentucky Implementation Model.

337

"Technology Wedges" for Implementing Green Manufacturing  

E-Print Network [OSTI]

issues in green design and manufacturing." ManufacturingFOR IMPLEMENTING GREEN MANUFACTURING David Dornfeld BerkeleyCalifornia KEYWORDS Green Manufacturing, Technology,

Dornfeld, David; Wright, Paul

2007-01-01T23:59:59.000Z

338

Building America Expert Meeting: Retrofit Implementation - A...  

Energy Savers [EERE]

projects underway across the United States, and included representatives from utilities, energy program implementation firms, affordable housing agencies, and the financing...

339

Preparing for Project Implementation Assigning Accountability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assigning Accountability for Each Project, April 14, 2010 Preparing for Project Implementation Assigning Accountability for Each Project, April 14, 2010 Assigning Accountability...

340

Energy Sector Cybersecurity Framework Implementation Guidance  

Broader source: Energy.gov (indexed) [DOE]

JANUARY 2015 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Energy Sector...

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Solar Schools Assessment and Implementation Project: Financing...  

Broader source: Energy.gov (indexed) [DOE]

on K-12 Schools Solar Schools Assessment and Implementation Project: Financing Options on Solar Installations on K-12 Schools This report focuses on financial options developed...

342

Energy Efficiency Post-2011 Implementation Proposal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to provide BPA with recommendations on program implementation details, including: 1. Energy Efficiency Incentive (EEI) 2. Small, Rural, Residential Focus 3. Conservation...

343

Energy Sector Cybersecurity Framework Implementation Guidance...  

Broader source: Energy.gov (indexed) [DOE]

Cybersecurity Framework Implementation Guidance - Notice of Public Comment: Federal Register Notice, Volume 79, No. 177, September 12, 2014 Energy Sector Cybersecurity Framework...

344

Accelerator Facility Safety Implementation Guide for DOE Order (0) 420.2C, Safety of Accelerator Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The revision will address implementation of roles and responsibilities, improve operational efficiency using operating experience, and clarify the use of program requirements such as the Unreviewed Safety Issue and Accelerator Readiness Review.

2013-07-17T23:59:59.000Z

345

DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a requiredImplementation Proposal for The National Action Plan on Demand Response.”

346

Hazardous Waste Management Implementation Inspection Criteria...  

Broader source: Energy.gov (indexed) [DOE]

focus area. Attention will be given to on-site activities governed by 40 Subchapter I (Solid Waste) and state regulations where delegated authority exists, excluding landfill...

347

Documentation Requirements for Sensory Impairments  

E-Print Network [OSTI]

Documentation Requirements for Sensory Impairments Vision and Hearing Students, faculty, staff documentation requirements: 1. Requirements of the PRACTITIONER: A) Ophthalmologists and optometrists of interest. C) Documentation must be typed, dated and signed by the evaluator and submitted to ODR

348

BES Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

Dart, Eli; Tierney, Brian; Dart, Eli; Biocca, A.; Carlson, R.; Chen, J.; Cotter, S.; Dattoria, V.; Davenport, J.; Gaenko, A.; Kent, P.; Lamm, M.; Miller, S.; Mundy, C.; Ndousse, T.; Pederson, M.; Perazzo, A.; Popescu, R.; Rouson, D.; Sekine, Y.; Sumpter, B.; Wang, C.-Z.; Whitelam, S.; Zurawski, J.

2011-02-01T23:59:59.000Z

349

Required Annual Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORVEnergy Request For Report7Required

350

Required Annual Notices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORVEnergy Request For Report7RequiredAnnual

351

Quantum entanglement in the NMR implementation of the Deutsch-Jozsa algorithm  

E-Print Network [OSTI]

A scheme to execute an n-bit Deutsch-Jozsa (D-J) algorithm using n qubits has been implemented for up to three qubits on an NMR quantum computer. For the one and two bit Deutsch problem, the qubits do not get entangled, hence the NMR implementation is achieved without using spin-spin interactions. It is for the three bit case, that the manipulation of entangled states becomes essential. The interactions through scalar J-couplings in NMR spin systems have been exploited to implement entangling transformations required for the three bit D-J algorithm.

Arvind; Kavita Dorai; Anil Kumar

1999-09-22T23:59:59.000Z

352

H2FIRST Hydrogen Contaminant Detector Task: Requirements Document and Market Survey  

Broader source: Energy.gov [DOE]

This H2FIRST project report, published in April 2015, describes the current commercial state of the art in contamination detection and identifies the technical requirements for implementing a hydrogen contaminant detector at a station.

353

Monitoring success of HIV/AIDS health care delivery : balancing donor requirements with internal management needs  

E-Print Network [OSTI]

Health care delivery organizations bear the burden of meeting monitoring and evaluation requirements set by numerous external organizations often at the cost of implementing internally defined management needs. Monitoring ...

Hu, Terry

2011-01-01T23:59:59.000Z

354

Interrelationship of Program Regulations and Financial Assistance Regulations  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to set forth the interrelationship between all program regulations which will result in assistance awards (Program Regulations) and the Department of Energy Assistance Regulations (DOE-AR, 10 CRF Part 600), including procedures for exceptions, deviations or waivers.

1980-04-24T23:59:59.000Z

355

UCSD Implementing Procedures Effective Date: July 1, 1996 Page 1  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1/Definitions of Terms B. UCSD Implementing Procedures 14/Affirmative Action C. UCSD Implementing Procedures 23/Performance Appraisal D. UC PPSM 30/Salary E. UCSD Implementing Procedures 30/Salary Equity Increase

Tsien, Roger Y.

356

A primer on incentive regulation for electric utilities  

SciTech Connect (OSTI)

In contemplating a regulatory approach, the challenge for regulators is to develop a model that provides incentives for utilities to engage in socially desirable behavior. In this primer, we provide guidance on this process by discussing (1) various models of economic regulation, (2) problems implementing these models, and (3) the types of incentives that various models of regulation provide electric utilities. We address five regulatory models in depth. They include cost-of-service regulation in which prudently incurred costs are reflected dollar-for-dollar in rates and four performance-based models: (1) price-cap regulation, in which ceilings are placed on the average price that a utility can charge its customers; (2) revenue-cap regulation, in which a ceiling is placed on revenues; (3) rate-of-return bandwidth regulation, in which a utility`s rates are adjusted if earnings fall outside a {open_quotes}band{close_quotes} around equity returns; and (4) targeted incentives, in which a utility is given incentives to improve specific components of its operations. The primary difference between cost-of-service and performance-based approaches is the latter sever the tie between costs and prices. A sixth, {open_quotes}mixed approach{close_quotes} combines two or more of the five basic ones. In the recent past, a common mixed approach has been to combine targeted incentives with cost-of-service regulation. A common example is utilities that are subject to cost-of-service regulation are given added incentives to increase the efficiency of troubled electric-generating units.

Hill, L.J.

1995-10-01T23:59:59.000Z

357

Civilian Radioactive Waste Management System Requirements Document  

SciTech Connect (OSTI)

The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.

C.A. Kouts

2006-05-10T23:59:59.000Z

358

ENVIRONMENTAL HEALTH SCIENCES Plan Requirements Campus: UMICH RG = Requirement Group  

E-Print Network [OSTI]

ENVIRONMENTAL HEALTH SCIENCES Plan Requirements Campus: UMICH RG = Requirement Group Career: GPH RQ = Requirement Program: 01848 LN = Line Plan: 3200MPH RG 5298 ENVIRONMENTAL HEALTH SCIENCES REQUIREMENTS, 643, 653, 675, 677 or 695 LN 0030 - Environmental Health Sciences: EHS 501, 506, 507 or 508 LN 0040

Shyy, Wei

359

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group  

E-Print Network [OSTI]

BIOMEDICAL ENGINEERING BSE PLAN REQUIREMENTS Campus: UMICH RG = Requirement Group Career: UENG RQ = Requirement Program: LN = Line Plan: 0880BSE Sub-Plan: RG 6856 BIOMEDICAL ENGINEERING MAJOR REQUIREMENTS Effective FA05/1560 (09/06/2005) RQ 4996 Program Subjects Effective FA05/1560 (09/06/2005) LN 0010 BIOMEDE

Shyy, Wei

360

Title I implementation: Status report on nonattainment areas  

SciTech Connect (OSTI)

Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA's new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency's (EPA's) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO[sub x]) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO[sub x] to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO[sub x] control strategy. The NO[sub x] emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO[sub x] control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

Kenkeremath, L.D.; Snyder, T.C.

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Title I implementation: Status report on nonattainment areas  

SciTech Connect (OSTI)

Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA`s new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency`s (EPA`s) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO{sub x}) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO{sub x} to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO{sub x} control strategy. The NO{sub x} emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO{sub x} control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

Kenkeremath, L.D.; Snyder, T.C.

1993-01-01T23:59:59.000Z

362

Vehicle fuel economy benefit and aftertreatment requirement of an HCCI-SI engine system  

E-Print Network [OSTI]

This body of work dimensions the HCCI fuel economy benefits and required aftertreatment performance for compliance with emissions regulations in North America and Europe. The following parameters were identified as key ...

Hardy, AliciA Jillian Jackson, 1978-

2007-01-01T23:59:59.000Z

363

Utility External Disconnect Switch: Practical, Legal, and Technical Reasons to Eliminate the Requirement  

Broader source: Energy.gov [DOE]

This report documents the safe operation of PV systems without a utility external disconnect switch in several large jurisdictions. It includes recommendations for regulators contemplating utility external disconnect switch requirements.

364

Emotion Regulation JAMES J. GROSS  

E-Print Network [OSTI]

CHAPTER 31 ·Emotion Regulation JAMES J. GROSS Have you ever gotten so angry that you've done), and self-regulation (Mischel, Shoda, & Rodriguez, 1989). What is new are the theoretical and empiri cal

Gross, James J.

365

Hazardous Waste Management Regulations (Mississippi)  

Broader source: Energy.gov [DOE]

The Hazardous Waste Management Regulations follow the EPA's definitions and guidelines for the most part, which are listed in 40 CFR parts 260-282. In addition to these federal regulations the...

366

Corporate governance and banking regulation  

E-Print Network [OSTI]

The globalisation of banking markets has raised important issues regarding corporate governance regulation for banking institutions. This research paper addresses some of the major issues of corporate governance as it relates to banking regulation...

Alexander, Kern

367

Private Regulation of Consumer Arbitration  

E-Print Network [OSTI]

of the need for future legislative action should take into account the effectiveness of this private regulation. That said, we do not assert that private regulation alone - with no public regulatory backstop, such as through court oversight - suffices...

Drahozal, Christopher R.; Zyontz, Samantha

2012-01-01T23:59:59.000Z

368

Wind power communication Design and implementation  

E-Print Network [OSTI]

Wind power communication ­ Design and implementation of test environment for IEC61850/UCA2 Elforsk rapport 02:16 Anders Johnsson, Jörgen Svensson April 2002 #12;#12;Wind power communication ­ Design 2002 #12;#12;Wind power communication ­ Design and implementation of test environment for IEC61850/UCA2

369

UCSD Implementing Procedures 36/Classification of Positions  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1) 36/Classification of Positions I. REFERENCES AND RELATED POLICIES A. UCSD Implementing Procedures 20 ­ Recruitment B. UC PPSM 36 - Classification of Positions C shall be obtained prior to any commitment to the concerned individual. III. PROCEDURES A. New

Tsien, Roger Y.

370

A Spatial Computing Architecture Implementing Computation Circuits  

E-Print Network [OSTI]

A Spatial Computing Architecture for Implementing Computation Circuits David Grant Supervisor: Dr Architecture Tools Preliminary Results Conclusions #12;3 Introduction Computational Circuits Software MB of memory ­ Add a few million gates ??? #12;5 Architecture and Tools to implement computational

Lemieux, Guy

371

Implementation and Performance of Parallelised Turbo Decoders  

E-Print Network [OSTI]

1 Implementation and Performance of Parallelised Turbo Decoders Enes Erdin TUBITAK Defense In this paper, we discuss the implementation of a low latency decoding algorithm for turbo codes and repeat. Index Terms Turbo codes, repeat accumulate codes, parallellised turbo decoding, BCJR, FPGA, metric

Yýlmaz, �zgür

372

hal00270574, Testing Data Types Implementations from  

E-Print Network [OSTI]

is data type abstraction, testing a concrete implementation raises the issue of the gap betweenhal­00270574, version 1 ­ 6 Apr 2008 Testing Data Types Implementations from Algebraic Speci#12.legall@ibisc.univ-evry.fr Abstract. Algebraic speci#12;cations of data types provide a natural basis for testing data types

Paris-Sud XI, Université de

373

Extending and implementing RASP Stefania Costantini  

E-Print Network [OSTI]

Extending and implementing RASP Stefania Costantini Universit`a di L'Aquila Stefania Programming), called RASP, standing for ASP with Resources. RASP supports declarative reasoning on production. Finally, we report on raspberry, a prototypical implementation of RASP. This tool consists of a compiler

Formisano, Andrea

374

Regulation of Meiotic Recombination  

SciTech Connect (OSTI)

Meiotic recombination results in the heritable rearrangement of DNA, primarily through reciprocal exchange between homologous chromosome or gene conversion. In plants these events are critical for ensuring proper chromosome segregation, facilitating DNA repair and providing a basis for genetic diversity. Understanding this fundamental biological mechanism will directly facilitate trait mapping, conventional plant breeding, and development of genetic engineering techniques that will help support the responsible production and conversion of renewable resources for fuels, chemicals, and the conservation of energy (1-3). Substantial progress has been made in understanding the basal recombination machinery, much of which is conserved in organisms as diverse as yeast, plants and mammals (4, 5). Significantly less is known about the factors that regulate how often and where that basal machinery acts on higher eukaryotic chromosomes. One important mechanism for regulating the frequency and distribution of meiotic recombination is crossover interference - or the ability of one recombination event to influence nearby events. The MUS81 gene is thought to play an important role in regulating the influence of interference on crossing over. The immediate goals of this project are to use reverse genetics to identify mutants in two putative MUS81 homologs in the model plant Arabidopsis thaliana, characterize those mutants and initiate a novel forward genetic screen for additional regulators of meiotic recombination. The long-term goal of the project is to understand how meiotic recombination is regulated in higher eukaryotes with an emphasis on the molecular basis of crossover interference. The ability to monitor recombination in all four meiotic products (tetrad analysis) has been a powerful tool in the arsenal of yeast geneticists. Previously, the qrt mutant of Arabidopsis, which causes the four pollen products of male meiosis to remain attached, was developed as a facile system for assaying recombination using tetrad analysis in a higher eukaryotic system (6). This system enabled the measurement of the frequency and distribution of recombination events at a genome wide level in wild type Arabidopsis (7), construction of genetic linkage maps which include positions for each centromere (8), and modeling of the strength and pattern of interference (9). This proposal extends the use of tetrad analysis in Arabidopsis by using it as the basis for assessing the phenotypes of mutants in genes important for recombination and the regulation of crossover interference and performing a novel genetic screen. In addition to broadening our knowledge of a classic genetic problem - the regulation of recombination by crossover interference - this proposal also provides broader impact by: generating pedagogical tools for use in hands-on classroom experience with genetics, building interdisciplinary collegial partnerships, and creating a platform for participation by junior scientists from underrepresented groups. There are three specific aims: (1) Isolate mutants in Arabidopsis MUS81 homologs using T-DNA and TILLING (2) Characterize recombination levels and interference in mus81 mutants (3) Execute a novel genetic screen, based on tetrad analysis, for genes that regulate meiotic recombination

Gregory p. Copenhaver

2011-11-09T23:59:59.000Z

375

CR mammography: Design and implementation of a quality control program  

SciTech Connect (OSTI)

Despite the recent acquisition of significant quantities of computed radiography CR equipment for mammography, Mexican regulations do not specify the performance requirements for digital systems such as those of CR type. The design of a quality control program QCP specific for CR mammography systems was thus considered relevant. International protocols were taken as reference to define tests, procedures and acceptance criteria. The designed QCP was applied in three CR mammography facilities. Important deficiencies in spatial resolution, noise, image receptor homogeneity, artifacts and breast thickness compensation were detected.

Moreno-Ramirez, A.; Brandan, M. E.; Villasenor-Navarro, Y.; Galvan, H. A.; Ruiz-Trejo, C. [Instituto de Fisica, Universidad Nacional Autonoma de Mexico, DF 04510 (Mexico); Departamento de Radiodiagnostico, Instituto Nacional de Cancerologia, DF 14080 (Mexico); Instituto de Fisica, Universidad Nacional Autonoma de Mexico, DF 04510 (Mexico)

2012-10-23T23:59:59.000Z

376

Federal Environmental Regulations Impacting Hydrocarbon Exploration, Drilling, and Production Operations  

SciTech Connect (OSTI)

Waste handling and disposal from hydrocarbon exploration, drilling, and production are regulated by the US Environmental Protection Agency (EPA) through federal and state regulations and/or through implementation of federal regulations. Some wastes generated in these operations are exempt under the Resource Conservation and Recovery Act (RCRA) but are not exempt under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Superfund Amendments and Reauthorization Act (SARA), and other federal environmental laws. Exempt wastes remain exempt only if they are not mixed with hazardous wastes or hazardous substances. Once mixture occurs, the waste must be disposed as a hazardous material in an approved hazardous waste disposal facility. Before the Clean Air Act as amended in 1990, air emissions from production, storage, steam generation, and compression facilities associated with hydrocarbon exploration, drilling, and production industry were not regulated. A critical proposed regulatory change which will significantly effect Class II injection wells for disposal of produced brine and injection for enhanced oil recovery is imminent. Federal regulations affecting hydrocarbon exploration, drilling and production, proposed EPA regulatory changes, and a recent significant US Court of Appeals decision are covered in this report. It appears that this industry will, in the future, fall under more stringent environmental regulations leading to increased costs for operators.

Carroll, Herbert B.; Johnson, William I.

1999-04-27T23:59:59.000Z

377

Environmental radiation exposure: Regulation, monitoring, and assessment  

SciTech Connect (OSTI)

Radioactive releases to the environment from nuclear facilities constitute a public health concern. Protecting the public from such releases can be achieved through the establishment and enforcement of regulatory standards. In the United States, numerous standards have been promulgated to regulate release control at nuclear facilities. Most recent standards are more restrictive than those in the past and require that radioactivity levels be as low as reasonably achievable (ALARA). Environmental monitoring programs and radiological dose assessment are means of ensuring compliance with regulations. Environmental monitoring programs provide empirical information on releases, such as the concentrations of released radioactivity in environmental media, while radiological dose assessment provides the analytical means of quantifying dose exposures for demonstrating compliance.

Chen, S.Y.; Yu, C.; Hong, K.J.

1991-01-01T23:59:59.000Z

378

Software and House Requirements Engineering  

E-Print Network [OSTI]

a requirements engineer who puts her knowledge of software construction together with her creativity to come upSoftware and House Requirements Engineering: Lessons Learned in Combatting Requirements Creep creativity to try to come up with a plan for a house that will meet the customer's requirements. The customer

Berry, Daniel M.

379

Match Pumps to System Requirements  

SciTech Connect (OSTI)

BestPractices Program tip sheet discussing pumping system efficiency matching pumps to system requirements

Not Available

2005-10-01T23:59:59.000Z

380

ASCR Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high performance networks is a consistent, widely deployed, well-maintained toolset that is optimized for wide area, high-speed data transfer (e.g. GridFTP) that allows scientists to easily utilize the services and capabilities that the network provides. Network test and measurement is an important part of ensuring that these tools and network services are functioning correctly. One example of a tool in this area is the recently developed perfSONAR, which has already shown its usefulness in fault diagnosis during the recent deployment of high-performance data movers at NERSC and ORNL. On the other hand, it is clear that there is significant work to be done in the area of authentication and access control - there are currently compatibility problems and differing requirements between the authentication systems in use at different facilities, and the policies and mechanisms in use at different facilities are sometimes in conflict. Finally, long-term software maintenance was of concern for many attendees. Scientists rely heavily on a large deployed base of software that does not have secure programmatic funding. Software packages for which this is true include data transfer tools such as GridFTP as well as identity management and other software infrastructure that forms a critical part of the Open Science Grid and the Earth System Grid.

Dart, Eli; Tierney, Brian

2009-08-24T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Regulation of Dams (Indiana)  

Broader source: Energy.gov [DOE]

The owner of a dam is required to maintain the structure in good condition, and notify the Department of Environmental Management upon the sale or transfer of ownership of the structure. The...

382

Regulations and Procedures Manual  

E-Print Network [OSTI]

7. Davis-Bacon Act and Service Contract Act 8. Employment7. Davis-Bacon Act and Service Contract Act The Davis-Baconsubcontracts. The Service Contract Act requires that service

Young, Lydia J.

2014-01-01T23:59:59.000Z

383

Army Regulation 38510 Headquarters  

E-Print Network [OSTI]

(para 23-6). o Clarifies policy for decommissioning sites with Nuclear Regulatory Commission licensed sites (para 24-3a). o Adds policy for closure requirements on the radiological decommissioning of areas

US Army Corps of Engineers

384

Cyber Security Process Requirements Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Manual establishes minimum implementation standards for cyber security management processes throughout the Department. Admin Chg 1 dated 9-1-09; Admin Chg 2 dated 12-22-09. Canceled by DOE O 205.1B. No cancellations.

2008-08-12T23:59:59.000Z

385

High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment report  

SciTech Connect (OSTI)

This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Report for the subject facility, represents the results of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. It contains; compliance status, remedial actions, and an implementing manuals report linking S/RID elements to requirement source to implementing manual and section.

Biebesheimer, E., Westinghouse Hanford Co.

1996-09-30T23:59:59.000Z

386

Regulatory Requirements for Cogeneration Projects  

E-Print Network [OSTI]

for cogeneration, therefore, the discussion will be limited to those portions of each act that affect cogenerators. Since the original cogeneration legislation was passed in 1978 and implemented by the Federal Energy Regulatory Commission (FERC) in 1980... major pieces of legislation that impact cogeneration as well as an outline of the major provisions obtain ed in the Department of Energy Federal Energy Regulatory Commission final rule implementing Section 201 and Section 210 of PURPA. Public Uti...

Curry, K. A., Jr.

1982-01-01T23:59:59.000Z

387

On the Effectiveness of Global Private Regulation: The Implementation of the Equator Principles by Multinational Banks  

E-Print Network [OSTI]

of the Saramaka People v Suriname, the Inter-American Courtthe Saramaka People v. Suriname, 2007 Inter-Am. Ct. H.R. (

Meyerstein, Ariel

2011-01-01T23:59:59.000Z

388

On the Effectiveness of Global Private Regulation: The Implementation of the Equator Principles by Multinational Banks  

E-Print Network [OSTI]

Architecture of a ?governance gap Chapter 4: The evolution of sustainability andSustainability Origins of Sustainable Development and the Evolution of Environmental Impact Assessment Chapter 3: Architecture

Meyerstein, Ariel

2011-01-01T23:59:59.000Z

389

On the Effectiveness of Global Private Regulation: The Implementation of the Equator Principles by Multinational Banks  

E-Print Network [OSTI]

rise of sustainable development Chapter 3: Architecture ofSustainable Development and the Evolution of Environmental Impact Assessment Chapter 3: ArchitectureARCHITECTURE OF A ?GOVERNANCE GAP? Despite the extensive history of the principles of sustainable

Meyerstein, Ariel

2011-01-01T23:59:59.000Z

390

Implementation of EU Waste Recycling Regulation in Macedonia: The Challenges of Policy Integration and Normative Change  

E-Print Network [OSTI]

cut open the container and collect the plastic bottles thatThe existing PET plastic bottled containers were originallythat the plastic bottle collection containers hade been made

Ilievska Kremer, Jannika Sjostrand

2013-01-01T23:59:59.000Z

391

Implementation of EU Waste Recycling Regulation in Macedonia: The Challenges of Policy Integration and Normative Change  

E-Print Network [OSTI]

harmonization; plastic bottles; batteries; informal sector,recycling of PET plastic bottles and household batteries.3. Laws managing PET plastic bottles and batteries were

Ilievska Kremer, Jannika Sjostrand

2013-01-01T23:59:59.000Z

392

Implementation of EU Waste Recycling Regulation in Macedonia: The Challenges of Policy Integration and Normative Change  

E-Print Network [OSTI]

a specific focus on the recycling of PET plastic bottles andprocess I chose recycling of PET plastic bottles andinformal recycling in Skopje. They collect mainly PET and

Ilievska Kremer, Jannika Sjostrand

2013-01-01T23:59:59.000Z

393

On the Effectiveness of Global Private Regulation: The Implementation of the Equator Principles by Multinational Banks  

E-Print Network [OSTI]

site of a controversial hydropower project sponsored by abilateral funding for hydropower, is included. $1.5 billionits relationship to hydropower in particular. See Leslie

Meyerstein, Ariel

2011-01-01T23:59:59.000Z

394

On the Effectiveness of Global Private Regulation: The Implementation of the Equator Principles by Multinational Banks  

E-Print Network [OSTI]

AMRO, Bank of America and HSBC have stronger biodiversityimplementing them. In May 2005, HSBC bank developed a waterincluding Deutsche Bank, HSBC Holdings, Natwest, Royal Bank

Meyerstein, Ariel

2011-01-01T23:59:59.000Z

395

The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124  

SciTech Connect (OSTI)

The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

Voegele, Michael D. [Consultant, Nye County Nuclear Waste Repository Project Office, 7404 Oak Grove Ave, Las Vegas, NV 89117 (United States)] [Consultant, Nye County Nuclear Waste Repository Project Office, 7404 Oak Grove Ave, Las Vegas, NV 89117 (United States); Vieth, Donald [1154 Chelttenham Place, Maineville, OH 45039 (United States)] [1154 Chelttenham Place, Maineville, OH 45039 (United States)

2013-07-01T23:59:59.000Z

396

Evaluating the Impact of Solar Generation on Balancing Requirements in Southern Nevada System  

SciTech Connect (OSTI)

Abstract—In this paper, the impacts of solar photovoltaic (PV) generation on balancing requirements including regulation and load following in the Southern Nevada balancing area are analyzed. The methodology is based on the “swinging door” algorithm and a probability box method developed by PNNL. The regulation and load following signals are mimicking the system’s scheduling and real-time dispatch processes. Load, solar PV generation and distributed PV generation (DG) data are used in the simulation. Different levels of solar PV generation and DG penetration profiles are used in the study. Sensitivity of the regulation requirements with respect to real-time solar PV generation forecast errors is analyzed.

Ma, Jian; Lu, Shuai; Etingov, Pavel V.; Makarov, Yuri V.

2012-07-26T23:59:59.000Z

397

Self-regulating valve  

DOE Patents [OSTI]

A variable, self-regulating valve having a hydraulic loss coefficient proportional to a positive exponential power of the flow rate. The device includes two objects in a flow channel and structure which assures that the distance between the two objects is an increasing function of the flow rate. The range of spacing between the objects is such that the hydraulic resistance of the valve is an increasing function of the distance between the two objects so that the desired hydraulic loss coefficient as a function of flow rate is obtained without variation in the flow area.

Humphreys, D.A.

1982-07-20T23:59:59.000Z

398

WIPP Documents - Federal Regulations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies | Blandine Jerome VelenciaNewsNewsFederal Regulations 40 CFR

399

New environmental regulation for the aerospace industry: The aerospace NESHAP  

SciTech Connect (OSTI)

40 CFR Part 63, Subpart GG, the National Emission Standard for Hazardous Air Pollutants for Aerospace Manufacturing and Rework Facilities, commonly referred to as the Aerospace NESHAP, was issued on September 1, 1995 and requires compliance by September 1, 1998. The regulation affects any facility that manufactures or reworks commercial, civil, or military aircraft vehicles or components and is a major source of Hazardous Air Pollutants (HAPs). The regulation targets reducing Volatile Organic Compound (VOC) and Hazardous Air Pollutant (HAP) emissions to the atmosphere. Processes affected by the new regulation include aircraft painting, paint stripping, chemical milling masking, solvent cleaning, and spray gun cleaning. Regulatory requirements affecting these processes are summarized, and different compliance options compared in terms of cost-effectiveness and industry acceptance. Strategies to reduce compliance costs and minimize recordkeeping burdens are also presented.

Bauer, J.P.; Gampper, B.P. [Brusn and McDonnell Waste Consultants, Inc., Kansas City, MO (United States); Baker, J.M. [Raytheon Aircraft Co., Wichita, KS (United States)

1997-12-31T23:59:59.000Z

400

Conduct of Operations, the first line supervisor: The key to implementation  

SciTech Connect (OSTI)

Implementation of US Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities (DOE 1990) requires modification of personal behavior and group culture. Stranded in the middle, between vision and practical application, is the first line supervisor. Conduct of Operations is a mixture of philosophy and application requiring time, resources, and motivated personnel to achieve visible, long lasting, and meaningful improvement in safety, productivity, and accountability. Consistency in training and implementation strategies for all levels of the company is essential to build the team necessary to establish the ideal Conduct of Operations environment. The focus should be on producing change, strengthening supervisor interaction with their direct reports, and making Conduct of Operations implementation permanent. The first line supervisor is the key to successful implementation. To aid the supervisor in smoothing the implementation process the following questions are covered in this report: (1) what lessons have we learned from our experience so far (2) is there a best way to introduce and orchestrate an atmosphere for change using Conduct of Operations principles (3) what are the roles for each participant in this change (4) what are the tools to help in this process and, (5) what will it cost.

Anglesey, S.C.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Conduct of Operations, the first line supervisor: The key to implementation  

SciTech Connect (OSTI)

Implementation of US Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities (DOE 1990) requires modification of personal behavior and group culture. Stranded in the middle, between vision and practical application, is the first line supervisor. Conduct of Operations is a mixture of philosophy and application requiring time, resources, and motivated personnel to achieve visible, long lasting, and meaningful improvement in safety, productivity, and accountability. Consistency in training and implementation strategies for all levels of the company is essential to build the team necessary to establish the ideal Conduct of Operations environment. The focus should be on producing change, strengthening supervisor interaction with their direct reports, and making Conduct of Operations implementation permanent. The first line supervisor is the key to successful implementation. To aid the supervisor in smoothing the implementation process the following questions are covered in this report: (1) what lessons have we learned from our experience so far? (2) is there a best way to introduce and orchestrate an atmosphere for change using Conduct of Operations principles? (3) what are the roles for each participant in this change? (4) what are the tools to help in this process? and, (5) what will it cost.

Anglesey, S.C.

1992-05-01T23:59:59.000Z

402

Resources on Implementing Energy Savings Performance Contracts...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

an ESPC Detailed Energy Survey Planning and Reporting for O&M in Federal ESPCs FEMP O&M Best Practices Guide Life Cycle Costing Tools Helps Federal agencies implement energy- and...

403

Parabolic cylinder functions implemented in Matlab  

E-Print Network [OSTI]

Routines for computation of Weber's parabolic cylinder functions and their derivatives are implemented in Matlab for both moderate and great values of the argument. Standard, real solutions are considered. Tables of values are included.

E. Cojocaru

2009-01-15T23:59:59.000Z

404

Graph Implementations for Nonsmooth Convex Programs  

E-Print Network [OSTI]

Summary. We describe graph implementations, a generic method for represent- ... object-oriented features of Matlab to turn it into an optimization modeling language: ..... For matrix and array expressions, these rules are applied on an elemen-.

2007-09-07T23:59:59.000Z

405

Design and implementation of the DDA network  

E-Print Network [OSTI]

Udo W. Pooch (Member) Pierre J. Catala (Member) Ric ard A. Volz (Head of Department) December 1996 Major Subject: Computer Science ABSTRACT Design and Implementation of the DDA Network. (December 1996) Wenhu Lu, B. S. , Fudan University; M...

Lu, Wenhu

1996-01-01T23:59:59.000Z

406

Phosphorylation based insulation devices design and implementation  

E-Print Network [OSTI]

This thesis presents the analysis of a phosphorylation based insulation device implemented in Saccharomyces cerevisae and the minimization of the retroactivity to the input and retroactivity to the output of a single cycle ...

Rivera Ortiz, Phillip M. (Phillip Michael)

2013-01-01T23:59:59.000Z

407

Kuali Financial System Implementation Collector Interface Meeting  

E-Print Network [OSTI]

Kuali Financial System Implementation Collector Interface Meeting December 17, 2008 Presenters of the Kuali Financial System (KFS) Collector Interface Format Differences from FRS Answer your questions #12 Collector File collector

Stephens, Graeme L.

408

IMPLEMENTATION OF ONCE-THROUGH COOLING  

E-Print Network [OSTI]

IMPLEMENTATION OF ONCE-THROUGH COOLING MITIGATION THROUGH ENERGY INFRASTRUCTURE PLANNING AND PROCUREMENT Michael R. Jaske Electricity Supply Analysis Division California Energy Commission Dennis C ...........................................................................................................................................1 Energy Agencies' Presumptions About Once-through Cooling Mitigation

409

Indoor robot gardening: design and implementation  

E-Print Network [OSTI]

This paper describes the architecture and implementation of a distributed autonomous gardening system with applications in urban/indoor precision agriculture. The garden is a mesh network of robots and plants. The gardening ...

Correll, Nikolaus

410

NEXT GENERATION NUCLEAR PLANT PROJECT IMPLEMENTATION STRATEGY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NEXT GENERATION NUCLEAR PLANT PROJECT IMPLEMENTATION STRATEGY Presented by NGNP Industry Alliance November 30, 2009 I In nd du us st tr ry y A Al ll li ia an nc ce e Clean,...

411

Environmental Management System `We are implementing an  

E-Print Network [OSTI]

in our Environmental Policy Statement. Specifically we will: · Comply with relevant environmental. · Publishing an environmental policy which sets out our key targets (see opposite). · EstablishingEnvironmental Management System `We are implementing an Environmental Management System to address

412

NOTICE OF PROPOSED REGULATION AMENDMENT Date: July 29, 2009  

E-Print Network [OSTI]

of the General Counsel or shall be considered null and void. (7) Escalation Clauses Prohibited. A lease shall information previously spread across several other regulations in this area. By combining all general shall be interpreted as circumventing any applicable statutory or regulatory requirements for life

Wu, Shin-Tson

413

Promises and Challenges of Thorium Implementation for Transuranic Transmutation - 13550  

SciTech Connect (OSTI)

This paper focuses on the challenges of implementing a thorium fuel cycle for recycle and transmutation of long-lived actinide components from used nuclear fuel. A multi-stage reactor system is proposed; the first stage consists of current UO{sub 2} once-through LWRs supplying transuranic isotopes that are continuously recycled and burned in second stage reactors in either a uranium (U) or thorium (Th) carrier. The second stage reactors considered for the analysis are Reduced Moderation Pressurized Water Reactors (RMPWRs), reconfigured from current PWR core designs, and Fast Reactors (FRs) with a burner core design. While both RMPWRs and FRs can in principle be employed, each reactor and associated technology has pros and cons. FRs have unmatched flexibility and transmutation efficiency. RMPWRs have higher fuel manufacturing and reprocessing requirements, but may represent a cheaper solution and the opportunity for a shorter time to licensing and deployment. All options require substantial developments in manufacturing, due to the high radiation field, and reprocessing, due to the very high actinide recovery ratio to elicit the claimed radiotoxicity reduction. Th reduces the number of transmutation reactors, and is required to enable a viable RMPWR design, but presents additional challenges on manufacturing and reprocessing. The tradeoff between the various options does not make the choice obvious. Moreover, without an overarching supporting policy in place, the costly and challenging technologies required inherently discourage industrialization of any transmutation scheme, regardless of the adoption of U or Th. (authors)

Franceschini, F.; Lahoda, E.; Wenner, M. [Westinghouse Electric Company LLC, Cranberry Township, PA (United States)] [Westinghouse Electric Company LLC, Cranberry Township, PA (United States); Lindley, B. [University of Cambridge (United Kingdom)] [University of Cambridge (United Kingdom); Fiorina, C. [Polytechnic of Milan (Italy)] [Polytechnic of Milan (Italy); Phillips, C. [Energy Solutions, Richland, WA (United States)] [Energy Solutions, Richland, WA (United States)

2013-07-01T23:59:59.000Z

414

Hardware implementation of a Hamming network  

E-Print Network [OSTI]

technology yet, the analog version was restricted to fixed-analog values (voltages). Simulation results showed the feasibility of the proposed hardware implementation, and experi- mentally, all the basic circuits performed as expected. In conclusion... evolved as one of the most challenging, fascinating and promising fields of study. The long-term goal of neural network researchers is to implement a machine that can make its own decisions and learn from self-experience. A machine that could approach...

Robinson Gonzalez, Moise?s Emanuel

1991-01-01T23:59:59.000Z

415

SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN  

SciTech Connect (OSTI)

This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

2012-11-26T23:59:59.000Z

416

Webinar: Hydrogen Storage Materials Requirements  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Hydrogen Storage Materials Requirements, originally presented on June 25, 2013.

417

Essential Regulation of Cell Bioenergetics by Constitutive InsP3  

E-Print Network [OSTI]

Essential Regulation of Cell Bioenergetics by Constitutive InsP3 Receptor Ca2+ Transfer in main- taining cellular bioenergetics. Macroautophagy provides eukaryotes with an adaptive response+ is fundamentally required to provide optimal bioenergetics by providing sufficient reducing equiv- alents

Parker, Ian

418

Building and Buildings, Scotland: The Building Standards Advisory Committee (Scotland) Regulations, 1959   

E-Print Network [OSTI]

These regulations make provision for the constitution and procedure of the Building Standards Advisory Committee which the Secretary of State is required to appoint under section 12 of the Building (Scotland) Act, 1959...

Maclay, John.S.

1959-01-01T23:59:59.000Z

419

The Translational Regulators GCN-1 and ABCF-3 Act Together to Promote Apoptosis in C. elegans  

E-Print Network [OSTI]

The proper regulation of apoptosis requires precise spatial and temporal control of gene expression. While the transcriptional and translational activation of pro-apoptotic genes is known to be crucial to triggering ...

Hirose, Takashi

420

Implementation Plan for the Office of Nuclear Energy Knowledge Management Program  

SciTech Connect (OSTI)

The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

Kimberlyn C. Mousseau

2011-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

SASE: Implementation of a Compressed Text Search Engine Srinidhi Varadarajan Tzicker Chiueh  

E-Print Network [OSTI]

in terms of raw speed as well as storage requirement, and has the capability of searching directly throughSASE: Implementation of a Compressed Text Search Engine Srinidhi Varadarajan Tzi­cker Chiueh)@cs.sunysb.edu http://www.ecsl.sunysb.edu/RFCSearch.html Abstract Keyword based search engines are the basic building

Chiueh, Tzi-cker

422

A High Performance, Energy Efficient GALS Processor Microarchitecture with Reduced Implementation Complexity  

E-Print Network [OSTI]

A High Performance, Energy Efficient GALS Processor Microarchitecture with Reduced Implementation Complexity ÂŁ YongKang Zhu , David H. Albonesi Ăť and Alper Buyuktosunoglu Ă? Department of Electrical, achieves impressive energy savings for a relatively low per- formance cost. However, the approach requires

Albonesi, David H.

423

An overview of the corrective action management unit and temporary unit regulations  

SciTech Connect (OSTI)

In February 1993, the US Environmental Protection Agency (EPA) promulgated the corrective action management unit (CAMU) and temporary unit (TU) regulations as 40 CFR Part 264, Subpart S. These regulations are intended to foster the selection of protective and cost-effective remedies for the restoration of sites contaminated by hazardous substances, hazardous wastes, and hazardous waste constituents by removing certain regulatory impediments to implementing those remedies, most notably those of the land disposal restrictions (LDRs). This paper provides a brief overview of the CAMU and TU regulations.

Green, D.R. [Argonne National Lab., IL (United States); Corathers, L. [Pacific Northwest Lab., Richland, WA (United States); Coalgate, J. [USDOE, Washington, DC (United States)

1995-03-01T23:59:59.000Z

424

Semantic Approach for Service Oriented Requirements Bin Zhao1,2  

E-Print Network [OSTI]

. It is recognized that Requirements Engineering is fundamental in implementing the service oriented architecture Computing is primarily carried out through web services enabled Service Oriented Architecture (SOASemantic Approach for Service Oriented Requirements Modeling Bin Zhao1,2 , Guang-Jun Cai1,2 , Zhi

Paris-Sud XI, Université de

425

Economic Congestion Relief Across Multiple Regions Requires Tradable Physical Flow-gate Rights  

E-Print Network [OSTI]

PWP-076 Economic Congestion Relief Across Multiple Regions Requires Tradable Physical Flow.ucei.berkeley.edu/ucei #12;Economic Congestion Relief Across Multiple Regions Requires Tradable Physical Flow-gate Rights- mission use. The North American Electric Reliability Council NERC is in the process of implementing

California at Berkeley. University of

426

Implementation Guide for use with 10 CFR Part 850, Chronic Beryllium Disease Prevention Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Department of Energy (DOE) has established regulatory requirements for the Chronic Beryllium Disease Prevention Program (CBDPP) in Title 10 of the Code of Federal Regulations (CFR), Part 850 (10 CFR 850) [64 Federal Register (FR) 68854]. Cancels DOE G 440.1-7. Certified 9-23-10.

2001-01-04T23:59:59.000Z

427

Nebraska Air Quality Regulations (Nebraska)  

Broader source: Energy.gov [DOE]

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to ambient air quality standards, pollution source operating permits, emissions reporting,...

428

Environmental Regulation, Globalization, and Innovation  

E-Print Network [OSTI]

This essay explores the complex relationship between environmental regulation, innovation, and sustainable development within the context of an increasingly globalizing economy. It will be argued that industrial policy, ...

Ashford, Nicholas

2009-01-01T23:59:59.000Z

429

Underground Injection Control Regulations (Kansas)  

Broader source: Energy.gov [DOE]

This article prohibits injection of hazardous or radioactive wastes into or above an underground source of drinking water, establishes permit conditions and states regulations for design,...

430

TABLE OF CONTENTS CALIFORNIA CODE OF REGULATIONS ADMINISTRATIVE REGULATIONS  

E-Print Network [OSTI]

#12;#12;i TABLE OF CONTENTS CALIFORNIA CODE OF REGULATIONS ADMINISTRATIVE REGULATIONS Section 10............................................. Admin-7 Section 10-106 -- Locally Adopted Energy Standards Product U-Values, Solar Heat Gain Coefficient, and Air Leakage....... Admin-12 Section 10-112 -- Criteria

431

Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis  

SciTech Connect (OSTI)

This document describes the results of the data quality objective (DQO) process undertaken to define data needs for state and federal requirements associated with toxic, hazardous, and/or radiological air emissions under the jurisdiction of the River Protection Project (RPP). Hereafter, this document is referred to as the Air DQO. The primary drivers for characterization under this DQO are the regulatory requirements pursuant to Washington State regulations, that may require sampling and analysis. The federal regulations concerning air emissions are incorporated into the Washington State regulations. Data needs exist for nonradioactive and radioactive waste constituents and characteristics as identified through the DQO process described in this document. The purpose is to identify current data needs for complying with regulatory drivers for the measurement of air emissions from RPP facilities in support of air permitting. These drivers include best management practices; similar analyses may have more than one regulatory driver. This document should not be used for determining overall compliance with regulations because the regulations are in constant change, and this document may not reflect the latest regulatory requirements. Regulatory requirements are also expected to change as various permits are issued. Data needs require samples for both radionuclides and nonradionuclide analytes of air emissions from tanks and stored waste containers. The collection of data is to support environmental permitting and compliance, not for health and safety issues. This document does not address health or safety regulations or requirements (those of the Occupational Safety and Health Administration or the National Institute of Occupational Safety and Health) or continuous emission monitoring systems. This DQO is applicable to all equipment, facilities, and operations under the jurisdiction of RPP that emit or have the potential to emit regulated air pollutants.

MULKEY, C.H.

1999-07-06T23:59:59.000Z

432

Software Quality Assurance Subcommittee : Guidelines for Requirements...  

Broader source: Energy.gov (indexed) [DOE]

Software Quality Assurance Subcommittee : Guidelines for Requirements Management Software Quality Assurance Subcommittee : Guidelines for Requirements Management Requirements...

433

Implementation Implementation  

E-Print Network [OSTI]

. Increase of the power and number of processors of supercomputers Site Computer kProc Tflops DOE(US) SGI 14 126 Computational Res. Lab.(India) EKA Cluster Xeon 14 117 Government Agency (Sweden) Cluster with the LOBPCG method 1 Theoretical background The Norm-Conserving method (NC) The Projector Augmented-Wave

Knyazev, Andrew

434

Lorentz symmetry breaking as a quantum field theory regulator  

SciTech Connect (OSTI)

Perturbative expansions of quantum field theories typically lead to ultraviolet (short-distance) divergences requiring regularization and renormalization. Many different regularization techniques have been developed over the years, but most regularizations require severe mutilation of the logical foundations of the theory. In contrast, breaking Lorentz invariance, while it is certainly a radical step, at least does not damage the logical foundations of the theory. I shall explore the features of a Lorentz symmetry breaking regulator in a simple polynomial scalar field theory and discuss its implications. In particular, I shall quantify just 'how much' Lorentz symmetry breaking is required to fully regulate the quantum theory and render it finite. This scalar field theory provides a simple way of understanding many of the key features of Horava's recent article [Phys. Rev. D 79, 084008 (2009)] on 3+1 dimensional quantum gravity.

Visser, Matt [School of Mathematics, Statistics, and Operations Research, Victoria University of Wellington, Wellington 6140 (New Zealand)

2009-07-15T23:59:59.000Z

435

Federal royalty oil eligibility requirements: the plateau legacy  

SciTech Connect (OSTI)

The courts ruled in the 1979 Plateau decision that the Secretary of the Interior is obligated to allocate federal royalty oil among all refineries not having their own crude oil source of supply, and can not impose Small Business Administration (SBA) eligibility requirements on potential purchasers of federal royalty oil. The effects of this decision was to derail the government's attempt to make royalty oil produced from Outer Continental Shelf leases and onshore sites available to the same refiners. The Minerals Management Service has yet to adopt final regulations harmonizing the court's ruling with applicable statutory requirements, resulting in actions of dubious legality. 75 references.

Zimmerman, J.J.; Bullerdick, K.H.

1984-01-01T23:59:59.000Z

436

Compendium of Regulatory Requirements Governing Underground Injection of Drilling Wastes  

SciTech Connect (OSTI)

This report provides a comprehensive compendium of the regulatory requirements governing the injection processes used for disposing of drilling wastes; in particular, for a process referred to in this report as slurry injection. The report consists of a narrative discussion of the regulatory requirements and practices for each of the oil- and gas-producing states, a table summarizing the types of injection processes authorized in each state, and an appendix that contains the text of many of the relevant state regulations and policies.

Puder, Markus G.; Bryson, Bill; Veil, John A.

2003-03-03T23:59:59.000Z

437

CULTURE SECURITE, DU DEBAT SCIENTIFIQUE A L'EXPERIENCE DE REGULATION NORVEGIENNE.  

E-Print Network [OSTI]

CULTURE SECURITE, DU DEBAT SCIENTIFIQUE A L'EXPERIENCE DE REGULATION NORVEGIENNE. SAFETY CULTURE steps back and considers the concept of safety culture from a broader perspective. It illustrates and offshore installations) in attempting to implement, from a regulatory point of view, safety culture

Boyer, Edmond

438

The Partially Stopped Leaky Bucket: An Efficient Traffic Regulator with Constant  

E-Print Network [OSTI]

1 The Partially Stopped Leaky Bucket: An Efficient Traffic Regulator with Constant Time Implementation Florin Ciucu, Brian L. Mark , and Robert Simon Lab. of Cooperative Work Environment Dept. of Computer Science Dept. of Electrical and Computer Engineering School of Information Technology

Ciucu, Florin

439

Managing System of Systems Requirements with a Requirements Screening Group  

SciTech Connect (OSTI)

Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

Ronald R. Barden

2012-07-01T23:59:59.000Z

440

327 Building fire hazards analysis implementation plan  

SciTech Connect (OSTI)

In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7.

BARILO, N.F.

1999-05-10T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

A Guide to Brazil's Requirements  

E-Print Network [OSTI]

(INMETRO) is responsible for notifying the proposed technical regulations to the World Trade Organization Agency (ANVISA), Ministry of Agriculture, Livestock and Supply (MAPA), the National Petroleum Agency, Natural Gas and Biofuels (ANP), the Ministry of Mines and Energy (MME), as well as the National

Perkins, Richard A.

442

Improved temperature regulation of process water systems for the APS storage ring.  

SciTech Connect (OSTI)

Beam stability and operational reliability of critical mechanical systems are key performance issues for synchrotron accelerators such as the Advanced Photon Source (APS). Stability is influenced by temperature fluctuations of the process water (PW) used for cooling and/or temperature conditioning storage ring (SR) components such as vacuum chambers, magnets, absorbers, etc. Operational reliability is crucial in maintaining facility beam operations and remaining within downtime ''budgets.'' Water systems for the APS storage ring were originally provided with a distributive control system (DCS) capable of regulation to {+-}1.0 F, as specified by facility design requirements. After several years of operation, a particular mode of component mortality indicated a need for upgrade of the temperature control system. The upgrade that was implemented was chosen for both improved component reliability and temperature stability (now on the order of {+-}0.2 F for copper components and {+-}0.05 F for aluminum components). The design employs a network of programmable logic controllers (PLCs) for temperature control that functions under supervision of the existing DCS. The human-machine interface (HMI) of the PLC system employs RSView32 software. The PLC system also interfaces with the EPICS accelerator control system to provide monitoring of temperature control parameters. Eventual supervision of the PLC system by EPICS is possible with this design.

Putnam, C.; Dortwegt, R.

2002-10-10T23:59:59.000Z

443

Parallel Implementation of Gamma-Point Pseudopotential Plane...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Parallel Implementation of Gamma-Point Pseudopotential Plane-Wave DFT with Exact Exchange. Parallel Implementation of Gamma-Point Pseudopotential Plane-Wave DFT with Exact...

444

Tribal Renewable Energy Webinar on Project Implementation and...  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Webinar on Project Implementation and Operations & Maintenance on Aug. 8 Tribal Renewable Energy Webinar on Project Implementation and Operations & Maintenance on...

445

NNSA implements nondestructive gas sampling technique for nuclear...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

implements ... NNSA implements nondestructive gas sampling technique for nuclear weapon components Posted: June 12, 2012 - 1:34pm The National Nuclear Security Administration...

446

Alloy Foam Diesel Emissions Control School Bus Implementation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Alloy Foam Diesel Emissions Control School Bus Implementation Alloy Foam Diesel Emissions Control School Bus Implementation Poster presentation from the 2007 Diesel...

447

California City Implements Solar-Powered Trash Compactors | Department...  

Broader source: Energy.gov (indexed) [DOE]

California City Implements Solar-Powered Trash Compactors California City Implements Solar-Powered Trash Compactors June 16, 2010 - 11:30am Addthis Riverside, Calif., used a...

448

Final Report Implementing Office of Management and Budget Information...  

Broader source: Energy.gov (indexed) [DOE]

Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (67 Fed Reg 62446) Final Report Implementing Office of Management and Budget...

449

Hickam Air Force Base Fuel Cell Vehicles: Early Implementation...  

Broader source: Energy.gov (indexed) [DOE]

Hickam Air Force Base Fuel Cell Vehicles: Early Implementation Experience Hickam Air Force Base Fuel Cell Vehicles: Early Implementation Experience This report sumarizes early...

450

Defense-in-Depth, How Department of Energy Implements Radiation...  

Broader source: Energy.gov (indexed) [DOE]

Defense-in-Depth, How Department of Energy Implements Radiation Protection in Low Level Waste Disposal Defense-in-Depth, How Department of Energy Implements Radiation Protection in...

451

How to implement renewable energy and energy efficiency options...  

Open Energy Info (EERE)

implement renewable energy and energy efficiency options Support for South African local government Jump to: navigation, search Tool Summary LAUNCH TOOL Name: How to implement...

452

Implementation Standing Technical Committee Strategic Plan- February 2012  

Broader source: Energy.gov [DOE]

This report outlines the gaps, barriers, and opportunities for implementing energy efficiency measures and practices in homes, as identified by the Building America Implementation Standing Technical Committee.

453

City of Pittsburgh Implementation Model: Green Initiatives Trust...  

Broader source: Energy.gov (indexed) [DOE]

City of Pittsburgh implementation model, Green initiatives trust fund. Author: U. S. Department of Energy City of Pittsburgh Implementation Model Website More Documents &...

454

Optimization of the Coupled Cluster Implementation in NWChem...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Coupled Cluster Implementation in NWChem on Petascale Parallel Architectures. Optimization of the Coupled Cluster Implementation in NWChem on Petascale Parallel Architectures....

455

Implement an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from...

456

State and Local Code Implementation: Southwest Region - 2014...  

Broader source: Energy.gov (indexed) [DOE]

Implementation: Southwest Region - 2014 BTO Peer Review Presenter: Jim Meyers, Southwest Energy Efficiency Project View the Presentation State and Local Code Implementation:...

457

State and Local Code Implementation: Northeast Region - 2014...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Local Code Implementation: South-central Region - 2014 BTO Peer Review Building Energy Codes Program - 2014 BTO Peer Review State and Local Code Implementation: State Energy...

458

Building Energy Codes Implementation Overview - 2014 BTO Peer...  

Energy Savers [EERE]

Building Energy Codes Implementation Overview - 2014 BTO Peer Review Building Energy Codes Implementation Overview - 2014 BTO Peer Review Presenter: Jeremiah Williams, U.S....

459

Implementing a Hydrogen Energy Infrastructure: Storage Options and System Design  

E-Print Network [OSTI]

to International Journal of Hydrogen Energy (November 2005).05—28 Implementing a Hydrogen Energy Infrastructure: StorageImplementing a Hydrogen Energy Infrastructure: Storage

Ogden, Joan M; Yang, Christopher

2005-01-01T23:59:59.000Z

460

ANSI Essential Requirements: Due process requirements for American  

E-Print Network [OSTI]

ANSI Essential Requirements: Due process requirements for American National Standards Edition: January 2010 Copyright by the American National Standards Institute (ANSI), 25 West 43rd Street, 4th Floor, New York, New York 10036. This material may be copied without permission from ANSI only

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Survey of environmental regulations applying to geothermal exploration, development, and use.  

SciTech Connect (OSTI)

Federal, State, and local environmental laws and regulations that apply to geothermal energy development are summarized. Most attention is given to those regulations which deal with air pollution, water pollution, solid wastes and impact assessments. Analyses are made of the regulations with respect to resource definition, pollutants currently not controlled, duplicity and overlap in permit and impact assessment requirements, the lack of uniformity of regulations between states, and the probable future approaches to the regulatory problems. This project updates a similar document (EPA/600/7-78-014) dated February 1978.

Beeland, G.V.

1984-03-01T23:59:59.000Z

462

Requirements Identification, Analysis and Measurement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis, and Management adds detail and rigor to the Mission Analysis output by: Refining the initial customer input into formal Customer Requirements Identifying any...

463

Implementation of Benchmarking Transportation Logistics Practices and Future Benchmarking Organizations  

SciTech Connect (OSTI)

The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how these findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)

Thrower, A.W. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Patric, J. [Booz Allen Hamilton, Washington, DC (United States); Keister, M. [Idaho National Laboratory, Idaho Falls, ID (United States)

2008-07-01T23:59:59.000Z

464

Executive Order 12941 Implementation at the Oak Ridge National Laboratory  

SciTech Connect (OSTI)

Congress enacted the Earthquake Hazards Reduction Act of 1977 (Public Law 95-124, as amended) to reduce risks to life and property from future earthquakes in the US. To implement the provisions of the Act, the Interagency Committee on Seismic Safety in Construction (ICSSC) was chartered. Approximately thirty Federal agencies, including the Department of Energy (DOE), participate in the ICSSC. The ICSSC is chaired by the National Institute of Standards (NIST) which also provides the technical secretariat. EO 12941, Seismic Safety of Existing Federally Owned or Leased Buildings, were prepared and issued by the ICSSC to reduce the vulnerability to buildings owned or leased by agencies or departments for Federal use. This report documents the implementation of EO 12941 at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. ORNL is managed and operated by Lockheed Martin Energy Research, Inc. (LMER) for the DOE-Oak Ridge Operations Office (DOE-ORO). The ORNL building inventory includes buildings that are physically located at ORNL, East Tennessee Technology Park (ETTP), and the Oak Ridge Y-12 Plant. This report addresses buildings physically located at the ORNL plant site. ORNL buildings located at ETTP and Y-12 plant sites will be included in the EO 12941 implementation reports for those sites. The scope of this effort included revising the building inventory for ORNL that was prepared prior to the development of the DOE management plan, evaluating owned buildings not exempt from the requirements of EO 12941, estimating the costs associated with the rehabilitation of vulnerable non-exempt buildings, and preparing this report in the TR-17 prescribed format (CNPE 1996). These activities were performed in accordance with the DOE management plan and as applicable, Phase I - Screening Guidelines To Determine The Structures Exempt From Executive Order 12941 (CNPE 1995).

Hunt, R.J.; Kroon, R.J.; Shaffer, K.E.

1998-08-01T23:59:59.000Z

465

Rocky Flats Cleanup Agreement implementation successes and challenges  

SciTech Connect (OSTI)

On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

Shelton, D.C.

1997-02-01T23:59:59.000Z

466

3D Duo Binary Turbo Decoder Hardware Implementation  

E-Print Network [OSTI]

Abstract: Each digital communication system needs channel coding to provide a certain quality of service. With the introducation of advanced channel codes like turbo codes and LDPC codes, error correcting near theoretical shannon limit became possible. Many applications require a low error floor in addition. The classical turbo code cannot meet this demand. Increasing the number of components codes, non-binary component codes or code concatenation are solutions for this problem, but come with a large complexity increase. In 2007 a new class of turbo codes, the 3D turbo code, was introduced by Berrou. The 3D turbo code provides a very good convergence and a large minimum distance at a low complexity. To the best of our knowledge this paper presents the first hardware implementation of a 3D turbo decoder. In addition we compare the implementation complexity of the 3D turbo decoder with the 8 and 16-state duo binary turbo decoder on FPGA and in 65nm ASIC technology.

Timo Lehngik-emden; Matthias Alles; Norbert Wehn

467

Advanced Metering Implementations - A Perspective from Federal Sector  

SciTech Connect (OSTI)

Federal mandate (EPACT 2005) requires that federal buildings install advanced electrical meters-meters capable of providing data at least daily and measuring the consumption of electricity at least hourly. This work presents selected advanced metering implementations to understand some of the existing practices related to data capture and to understand how the data is being translated into information and knowledge that can be used to improve building energy and operational performance to meet federal energy reduction mandates. This study highlights case studies to represent some of the various actions that are being taken based on the data that are being collected to improve overall energy performance of these buildings. Some of these actions include- individualized tenant billing and energy forecasting, benchmarking, identifying energy conservation measures, measurement and verification.

Eaarni, Shankar

2014-08-11T23:59:59.000Z

468

Experimental Implementation of a Quantum Optical State Comparison Amplifier  

E-Print Network [OSTI]

Quantum optical amplification that beats the noise addition limit for deterministic amplifiers has been realized experimentally using several different nondeterministic protocols. These schemes either require single-photon sources, or operate by noise addition and photon subtraction. Here we present an experimental demonstration of a protocol that allows nondeterministic amplification of known sets of coherent states with high gain and high fidelity. The experimental system employs the two mature quantum optical technologies of state comparison and photon subtraction and does not rely on elaborate quantum resources such as single-photon sources. The use of coherent states rather than single photons allows for an increased rate of amplification and a less complex photon source. Furthermore it means that the amplification is not restricted to low amplitude states. With respect to the two key parameters, fidelity and amplified state production rate, we demonstrate, without the use of quantum resources, significant improvements over previous experimental implementations.

Ross J. Donaldson; Robert J. Collins; Electra Eleftheriadou; Stephen M. Barnett; John Jeffers; Gerald S. Buller

2014-04-16T23:59:59.000Z

469

Alternative Fuel Tool Kit How To Implement  

E-Print Network [OSTI]

......................................................................................................................................................................9 Crunch the numbers: Vehicle cost calculators to a hybrid electric vehicle (having both a gas engine and an electric motor), but is able to recharge its1 5/2014 Alternative Fuel Tool Kit How To Implement: Electric Vehicles Contents Introduction

470

Implementation of Department of Energy Oversight Policy  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order provides direction for implementing Department of Energy (DOE) P 226.1, Department of Energy Oversight Policy, dated 6-10-05, which establishes DOE policy for assurance systems and processes established by DOE contractors and oversight programs performed by DOE line management and independent oversight organizations. Cancels DOE P 450.5. Canceled by DOE O 226.1A.

2005-09-15T23:59:59.000Z

471

ANALYSIS AND IMPLEMENTATION OF OPTOELECTRONIC NETWORK ROUTERS  

E-Print Network [OSTI]

ANALYSIS AND IMPLEMENTATION OF OPTOELECTRONIC NETWORK ROUTERS By Mongkol Raksapatcharawong and around the U.S. for their constant support. #12;iv Abstract Network routers based on optoelectronic in multiprocessor systems. By combining high-bandwidth optoelectronic I/O technology and high- performance CMOS

Pinkston, Timothy M.

472

IMPLEMENTATION OF THE PIPE PROCESSOR 1. Introduction  

E-Print Network [OSTI]

IMPLEMENTATION OF THE PIPE PROCESSOR 1. Introduction In the early 1980's a research project, known as the PIPE (Parallel Instruction with Pipe- lined Execution) project, was formed to investigate high to perform a single external memory reference. The PIPE project members decided to define a processor

Farrens, Matthew K.

473

Successful biomass (wood pellets ) implementation in  

E-Print Network [OSTI]

Successful biomass (wood pellets ) implementation in Estonia Biomass Utilisation of Local of primary energy in Estonia ! Wood fuels production ! Pellet firing projects in Estonia ­ SIDA Demo East Production of wood fuels in Estonia in 2002 Regional Energy Centres in Estonia Wood pellets production

474

DEPARTMENT OF COMPUTER SCIENCES Implementation of Orc  

E-Print Network [OSTI]

DEPARTMENT OF COMPUTER SCIENCES Implementation of Orc William Cook and Jayadev Misra Department coded in Java. ¯ An Orc program can call Java programs as sites. ¯ A Java program can call an Orc #12;DEPARTMENT OF COMPUTER SCIENCES Java Calling Orc Include in the main (Java) program � ¾ ´�µ where

Misra, Jayadev

475

Implementation of Department of Energy Oversight Policy  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order implements the policy that establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement. Cancels DOE O 226.1. Canceled by DOE O 226.1B

2007-07-31T23:59:59.000Z

476

Turbo and LDPC Codes: Implementation, Simulation,  

E-Print Network [OSTI]

1 Turbo and LDPC Codes: Implementation, Simulation, and Standardization June 7, 2006 Matthew/7/2006 Turbo and LDPC Codes 2/133 Tutorial Overview Channel capacity Convolutional codes ­ the MAP algorithm Turbo codes ­ Standard binary turbo codes: UMTS and cdma2000 ­ Duobinary CRSC turbo codes: DVB

Valenti, Matthew C.

477

Implementation Manual Self-Management Programs  

E-Print Network [OSTI]

i Implementation Manual Stanford Self-Management Programs 2008* Please note that while this manual is written for the Chronic Disease Self-Management Program (CDSMP) it can also be used for any of the other Stanford small group programs (Diabetes Self- Management, Positive Self-Management Program, Pain Self

Straight, Aaron

478

Verifying Nondeterministic Implementations of Deterministic Systems 1  

E-Print Network [OSTI]

in this paper is able to bridge the wide gap between the abstract specification and the implementation's often can show that an imple­ 1. This work partially funded by Semiconductor Research Corporation # 95­DC on the user­visible state. The verification process must bridge a wide gap between the detailed circuit

Bryant, Randal E.

479

Combination and Implementation of Processes and Data  

E-Print Network [OSTI]

Combination and Implementation of Processes and Data: from CSP­OZ to Java Clemens Fischer. They are not only used in huge companies and systems like insurance companies, banks or power plants, but also on that state in a predicative way using Z notation. ffl CSP (Communicating Sequential Processes) is a process

Habel, Annegret

480

FY95 capital asset implementation plan  

SciTech Connect (OSTI)

The Waste Isolation Division (WID) is committed to providing good stewardship for the capital assets under its operational and physical control. To achieve this goal, the WID has developed the Capital Asset Implementation Plan (CAIP) to continue to implement for FY95 Department of Energy (DOE) Order 4320.2A, Capital Asset Management Process (CAMP). The Order provides policy and elements needed to establish a credible, consistent, auditable, and technically sound process for the DOE to forecast, plan, and budget for capital assets on a functional unit level. The objective of the WIPP CAMP program is to meet the goals of DOE Order 4320.2A in the most effective and efficient manner possible in support of the Waste Isolation Pilot Plant (WIPP) mission. As a result, this CAIP provides a way to implement the CAMP Program using a graded approach. Continued implementation will be accomplished by improving the existing process, and establishing future goals to promote growth for the CAMP Program. The CAIP is issued annually by the WID with quarterly progress reports submitted to the DOE. This document describes the current-year program staffing, roles, responsibilities, funding, and near-term milestones. In addition, the results of past goals are discussed.

Not Available

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "require implementing regulations" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

THE SEQUOIA 2000 ARCHITECTURE AND IMPLEMENTATION STRATEGY  

E-Print Network [OSTI]

THE SEQUOIA 2000 ARCHITECTURE AND IMPLEMENTATION STRATEGY Michael Stonebraker and James Frew Center for Remote Sensing and Environmental Optics and Department of Geography University of California;#12;Sequoia Architecture and Plan i Abstract This paper describes the Sequoia 2000 software architecture

California at Irvine, University of

482

Using Associations Aspects to Implement Organisational Contracts  

E-Print Network [OSTI]

can be viewed as a system that, in part, coordinates the respiratory, circulatory, and digestive that Association-aspects were a suitable mechanism for implementing a coordination system. In this paper we show systems in dynamic environments. In many living systems this organisation is, in part, achieved through

Han, Jun

483

Gnie mcanique Implementing the Quotient Method Controller  

E-Print Network [OSTI]

of this project was to apply this method on a Ball-on-a- Wheel system. This system consists of a ball rolling the ball-on-a-wheel system it is important to have a sufficiently fast sampling rate. Normal webcamsSECTION DE Génie mécanique Implementing the Quotient Method Controller on the Ball-on-a-Wheel

Lausanne, Ecole Polytechnique Fédérale de

484

Implementing a MOOC David J. Malan  

E-Print Network [OSTI]

Implementing a MOOC David J. Malan malan@harvard.edu #12;CS50 an introduction to the intellectual enterprises of computer science and the art of programming #12;This is CS50. · lectures · sections;TODOs · content · psets · q&a · quizzes · shorts · software · Appliance · Discuss · Gradebook · Sandbox

Malan, David J.

485

Humidity requirements in WSCF Laboratories  

SciTech Connect (OSTI)

The purpose of this paper is to develop and document a position on Relative Humidity (RH) requirements in the WSCF Laboratories. A current survey of equipment vendors for Organic, Inorganic and Radiochemical laboratories indicate that 25% - 80% relative humidity may meet the environmental requirements for safe operation and protection of all the laboratory equipment.

Evans, R.A.

1994-10-01T23:59:59.000Z

486

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry/Biotechnology Graduate Program. A detailed account of the academic requirements and procedures is provided for graduate students in chemistry; to promote consistency in procedures and standards; and to provide a basis for communication between

Kounaves, Samuel P.

487

Degree Requirements COLLEGE OF ENGINEERING  

E-Print Network [OSTI]

or better is required in ECON 2000 (Engineering Economics), Philosophy 2244 (Engineering Ethics), and ENGLDegree Requirements COLLEGE OF ENGINEERING B.S. in Electrical Engineering Effective Date: 08) 6 Total 30 MUST SELECT ONE Computer Engineering Concentration Course Name/ # Credit Hours Course

Kulp, Mark

488

Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298,NIST31 ORVEnergy Request ForForms of1, 2

489

Parker Worthi Chapter 3. Implementation. Page 1  

E-Print Network [OSTI]

, the Building Envelope Standards, and the Streetscape Standards. COMPONENTS OF THE CODE Definitions Certain in the REGULATING PLAN. The Building Envelope Standards The BUILDING ENVELOPE STANDARDS establish basic parameters that must be done. The applicable standard for a building is determined by its STREET FRONTAGE contained

Zaferatos, Nicholas C.

490

An implementation of the Deutsch-Jozsa algorithm on a three-qubit NMR quantum computer  

E-Print Network [OSTI]

A new approach to the implementation of a quantum computer by high-resolution nuclear magnetic resonance (NMR) is described. The key feature is that two or more line-selective radio-frequency pulses are applied simultaneously. A three-qubit quantum computer has been investigated using the 400 MHz NMR spectrum of the three coupled protons in 2,3-dibromopropanoic acid. It has been employed to implement the Deutsch-Jozsa algorithm for distinguishing between constant and balanced functions. The extension to systems containing more coupled spins is straightforward and does not require a more protracted experiment.

N Linden H Barjat R Freeman

1998-08-21T23:59:59.000Z

491

Identifying the requirements of an agricultural robot for sensing and adjusting soil nutrient and pH levels  

E-Print Network [OSTI]

The nutrient requirements of soils using in agriculture for crop production were examined to determine the needs of a robotic system used to detect and regulate the nutrition levels of the soil. Nitrogen, phosphorus, and ...

Teague, Nicole (Nicole Dawn)

2011-01-01T23:59:59.000Z

492

Implementation of optimum solar electricity generating system  

SciTech Connect (OSTI)

Under the 10{sup th} Malaysian Plan, the government is expecting the renewable energy to contribute approximately 5.5% to the total electricity generation by the year 2015, which amounts to 98MW. One of the initiatives to ensure that the target is achievable was to establish the Sustainable Energy Development Authority of Malaysia. SEDA is given the authority to administer and manage the implementation of the feed-in tariff (FiT) mechanism which is mandated under the Renewable Energy Act 2011. The move to establish SEDA is commendable and the FiT seems to be attractive but there is a need to create awareness on the implementation of the solar electricity generating system (SEGS). In Malaysia, harnessing technologies related to solar energy resources have great potential for implementation. However, the main issue that plagues the implementation of SEGS is the intermittent nature of this source of energy. The availability of sunlight is during the day time, and there is a need for electrical energy storage system, so that there is electricity available during the night time as well. The meteorological condition such as clouds, haze and pollution affects the SEGS as well. The PV based SEGS is seems to be promising electricity generating system that can contribute towards achieving the 5.5% target and will be able to minimize the negative effects of utilizing fossil fuels for electricity generation on the environment. Malaysia is committed to Kyoto Protocol, which emphasizes on fighting global warming by achieving stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. In this paper, the technical aspects of the implementation of optimum SEGS is discussed, especially pertaining to the positioning of the PV panels.

Singh, Balbir Singh Mahinder, E-mail: balbir@petronas.com.my; Karim, Samsul Ariffin A., E-mail: samsul-ariffin@petronas.com.my [Department of Fundamental and Applied Sciences, Universiti Teknologi PETRONAS, 31750 Bandar Seri Iskandar, Perak (Malaysia); Sivapalan, Subarna, E-mail: subarna-sivapalan@petronas.com.my [Department of Management and Humanities, Universiti Teknologi PETRONAS, 31750 Bandar Seri Iskandar, Perak (Malaysia); Najib, Nurul Syafiqah Mohd; Menon, Pradeep [Department of Electrical and Electronics Engineering, Universiti Teknologi PETRONAS, 31750 Bandar Seri Iskandar, Perak (Malaysia)

2014-10-24T23:59:59.000Z

493

Regulating competitive markets: How to proceed?  

SciTech Connect (OSTI)

This paper describes the regulation of electricity and natural gas market. The prerequisites for market-based rates, regulating potentially competitive markets, regulating services where market power exists, and electronic communications and trading systems are discussed.

Santa, D.F. Jr.

1995-12-31T23:59:59.000Z

494

Post regulation circuit with energy storage  

DOE Patents [OSTI]

A charge regulation circuit provides regulation of an unregulated voltage supply and provides energy storage. The charge regulation circuit according to the present invention provides energy storage without unnecessary dissipation of energy through a resistor as in prior art approaches.

Ball, Don G. (Livermore, CA); Birx, Daniel L. (Oakley, CA); Cook, Edward G. (Livermore, CA)

1992-01-01T23:59:59.000Z

495

Science DMZ Implemented at CU Boulder  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Studies Science DMZ @ CU Science Engagement Move your data Programs & Workshops Science Requirements Reviews Case Studies OSCARS Case Studies Science DMZ Case Studies Science...

496

Reporting Cooperating Agencies in Implementing the Procedural...  

Energy Savers [EERE]

of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). REPORTING COOPERATING...

497

Preparing for Implementation of DOE O 435.1 at Hanford  

SciTech Connect (OSTI)

Implementation of a new DOE Order at a complex site like Hanford is not as simple as just stating that the Order is to be followed. There are contractual changes, interface adjustments and institutional obstacles to overcome that all must be properly analyzed and dealt with before the actual physical changes embodied in the new requirements can be put into practice. In planning for these changes associated with the new DOE 0 435.1 ''Radioactive Waste Management'', the Richland Operations Office (RL) of the U.S. Department of Energy is attempting to make an orderly and efficient transition to the new Order requirements. In so doing, RL is tasking the Management and Integration contractor for the Project Hanford Management Contract (PHMC) held by Fluor Daniel Hanford (FDH) to coordinate the planning and integration efforts necessary to ensure that resources needed to implement the new requirements are identified and plans for implementation completed within the first year after issuance of the Order. Implementation at Hanford is complicated not only by the relatively complex contract situation with the PHMC under FDH and its major subcontractors, the Environmental Remediation Contract (under Bechtel), and the Pacific Northwest National Laboratory (run by Battelle), but also by the newly created Office of River Protection (ORP) which reports directly to EM-1, and not to the Hanford site RL Manager. Despite the obstacles, however, Hanford is making a concerted effort to effectively implement the new requirements, while maximizing use of existing systems, processes and documentation. This paper describes the process and experiences Hanford has developed to accomplish this objective. The interested audience will include others involved in implementation of new DOE Order 435.1 and others interested in the workings of large federal installations such as Hanford. This paper concludes that through use of planning, communications and participation of involved parties, complex new requirements can be appropriately evaluated, analyzed and approaches for their implementation developed and successfully put into place. The approach taken by Hanford to accomplish this mission is set forth in this paper, and lessons learned along the way are described.

FRITZ, D.W.

2000-02-01T23:59:59.000Z

498

Part B - Requirements & Funding Information PART B - Requirements...  

Energy Savers [EERE]

to support the determinations and findings (D&F) required by FAR 17.502-2 to the contracting officer. Provide this information as an attachment or coordinate with the...

499

Implementation Plan: Jasper Management Prestart Review (Surrogate Material Experiments)  

SciTech Connect (OSTI)

Able Site is located 24 km northwest of Mercury on the Nevada Test Site. The Nevada Test Site is approximately 105 km northwest of Las Vegas, NV. Major facilities at Able Site include Buildings 5100,5180, and 5191. Significant external interfaces for the JASPER site include the electrical system, wastewater system, communications systems, and water supply system, which provides both potable and fire-protection water. Support services, which are provided on the Nevada Test Site, include medical, emergency response (NTS Fire Department), radiation protection, industrial hygiene, and waste management. Although JASPER will ultimately be used for actinide research, the start-up process requires system demonstration using surrogates in place of the actinide targets. LLNL Nevada Experiments and Operations (N) Program has established a Management Prestart Review (MPR) team to determine the readiness of the JASPER personnel and facilities to initiate surrogate-material experiments. A second MPR will be conducted before actinide experiments are executed. This document addresses implementation requirements for only the first MPR. This first review coincides with the completion of authorization-basis documents and physical subsystems, which have undergone appropriate formal engineering design reviews. This MPR will affirm the quality of those reviews, their findings/resolutions, and will look most closely at systems integration requirements and demonstrations that will have undergone technical acceptance reviews before this formal MPR action. Closure of MPR findings will finalize requirements for a DOE/NV Real Estate/Operations Permit (REOP) for surrogate-material experiments. Upon completion of that experiment series and the establishment of capabilities for incorporating special nuclear material (SNM) into future experiments, the team will convene again as part of the process of authorizing those activities. A summary of the review schedule is provided.

Cooper, W.E.

2000-09-29T23:59:59.000Z

500

Implementing Enterprise Lean A Look at Ogden Air Logistics Center  

E-Print Network [OSTI]

This paper documents the enterprise-wide lean implementation effort at Ogden Air Logistics Center, Hill

Rebentisch, Dr. Eric E.

2004-07-30T23:59:59.000Z