Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne  

Science Conference Proceedings (OSTI)

OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

None

2000-09-01T23:59:59.000Z

2

Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995  

SciTech Connect

This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.W., Westinghouse Hanford

1996-07-30T23:59:59.000Z

3

Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994  

SciTech Connect

This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

1995-08-01T23:59:59.000Z

4

Westinghouse Hanford Company Health and Safety Performance Report. First quarter calendar year 1995  

SciTech Connect

During the first quarter of CY 1995, four of the WHC sitewide ALARA performance goals were completed on or ahead of schedule. One of the completed goals related to reduction of radiological areas at WHC-managed facilities. Due to anticipated resource reductions and increased scope of work, several facilities escalated their reduction schedule. This allowed the ALARA goal to be completed and exceeded ahead of schedule. Industrial Safety and Health initiatives are being pursued in areas such as workplace ergonomics, safety training, and standards development. Positive efforts are ongoing in the areas of management commitment and employee involvement through the WHC Voluntary Protection Program. Successful implementation continues through the President`s Accident Prevention Council (PAPC) and division employee Accident Prevention Councils. The Company now has established CY 1995 PAPC goals. Major programmatic accomplishments completed during this reporting period include the Department of Energy-Headquarters (DOE-HQ) formally endorsing the Radiological Control organization`s approach toward development of the Radiation Protection Program (RPP) document. The DOE-HQ has recognized the significant contributions and leadership that Radiological Control has provided in planning and implementation of this ``model example of an RPP`` across the DOE complex and is encouraging other sites to contact WHC for assistance in developing their RPPs.

Lansing, K.A.

1995-05-01T23:59:59.000Z

5

Westinghouse Hanford Company health and safety performance report. Third quarter calendar year 1995  

SciTech Connect

The lost/restricted workday severity rate posted in CY 1994 of 45.50 was a significant improvement over the prior years and, remarkably, this rate has been reduced to 16.40 thus far in CY 1995 (Table 2--2). The indications from this sustained reduction are that employee, management, HEHF, and accident investigator efforts to manage injuries are becoming stronger (page 2--8). Congratulations to the Human Resources Department for working over 835,000 hours without a lost workday away injury/illness! The last lost workday away case occurred on 12/17/92. The Workers Compensation Report shows significant reduction in the amount of money expended for medical treatments and time loss due to industrial injuries. The cost of insurance continues to decrease. Continued savings can be attributed to aggressive claims and safety case management, an enhanced attitude by management creating a positive and proactive safety awareness culture, and a more aggressive return-to-work philosophy.

Lansing, K.A.

1995-11-01T23:59:59.000Z

6

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

7

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

8

Westinghouse Hanford Company health and safety performance report, First quarter calendar year 1994  

SciTech Connect

Safety training programs for the employee, manager, and safety observer are undergoing refinements in response to employee suggestions as well as to promote the interactions necessary to the success of the Voluntary Protection Program. Adjustments to these programs are described on pages 2-1 and 2-2. Significant events, which carry lessons we must learn in order to reduce injury potential, are summarized on pages 2-2 and 2-3. The events highlighted this quarter involve indoor air quality and unexpected weather changes which can impact outdoor work activities. Our analysis of injuries occurring this reporting period continues to feature the simple-task injuries which reflect on awareness levels and culture strength. In addition to injuries arising from simple, everyday tasks, a significant number of injuries were caused by objects in ``blind spots``. These are items placed out of view where an employee can contact them by reaching in to a drawer (staples, exacto blades, etc.), or by bumping/brushing against (wall hangings, sharp furniture edges).

Lansing, K.A.

1994-05-01T23:59:59.000Z

9

New Energy Dept., Berkeley Lab Report on Energy Service Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Energy Dept., Berkeley Lab Report on Energy Service Company Industry Growth New Energy Dept., Berkeley Lab Report on Energy Service Company Industry Growth September 25, 2013 -...

10

Joint Maintenance Status Report of Potomac Electric Power Company...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

11

Southern Company Smart Grid Host Site Progress Report  

Science Conference Proceedings (OSTI)

This report provides a progress update for the Southern Company Smart Grid Demonstration Host Site Project that is a part of the Electric Power Research Institute’s (EPRI’s) multi-year Smart Grid Demonstration Initiative. The Southern Company Demonstration Project is focused on integrating large-scale distributed energy resources (DER), including demand response, energy storage, distributed generation, and distributed renewable generation, via an integrated distribution management ...

2012-09-20T23:59:59.000Z

12

Independent Activity Report, CH2M Hill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, CH2M Hill Plateau Remediation Company Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 January 2011 Review of the CH2M Hill Plateau Remediation Company Unreviewed Safety Question Procedure [ARPT-RL-2011-003] The U.S. Department of Energy Office of Independent Oversight, within the Office of Health, Safety and Security, during a site visit from January 10-14, 2011, presented the results of a technical review of the CH2M Hill Plateau Remediation Company (PRC) Unreviewed Safety Question (USQ) Procedure. Independent Activity Report, CH2M Hill Plateau Remediation Company - January 2011 More Documents & Publications CX-009415: Categorical Exclusion Determination Independent Activity Report, Richland Operations Office - January 2011

13

New Energy Dept., Berkeley Lab Report on Energy Service Company Industry  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Energy Dept., Berkeley Lab Report on Energy Service Company New Energy Dept., Berkeley Lab Report on Energy Service Company Industry Growth New Energy Dept., Berkeley Lab Report on Energy Service Company Industry Growth September 25, 2013 - 2:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department and Lawrence Berkeley National Laboratory today released a new report on the market size, trends and growth projections for America's energy service company (ESCO) industry. The report details steady growth in the energy savings performance-based contracting sector over the past ten years, led by investments from state and local governments, the federal government and K-12 schools. Each year, this industry typically saves customers more than $4 billion in utility bills and enough energy to power nearly 2 million households - equivalent

14

2009 Reporting Year  

U.S. Energy Information Administration (EIA)

FRS Accumu- Book Value Year End Year's Foot Line # Gross Lated DD&A Net Additions DD&A of Disposals Other Balance Additions Other note Petroleum: A BCD E F G H IJ

15

Calendar Year Reports Archive  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

reports-archive Office of Inspector reports-archive Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Special Report: DOE/IG-0901 http://energy.gov/ig/downloads/special-report-doeig-0901 report-doeig-0901" class="title-link">Special Report: DOE/IG-0901

16

Esmeralda Energy Company Final Scientific Technical Report, January 2008,  

Open Energy Info (EERE)

Company Final Scientific Technical Report, January 2008, Company Final Scientific Technical Report, January 2008, Emigrant Slimhole Drilling Project, Doe Gred Iii (De-Fc36-04Go14339) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Esmeralda Energy Company Final Scientific Technical Report, January 2008, Emigrant Slimhole Drilling Project, Doe Gred Iii (De-Fc36-04Go14339) Details Activities (10) Areas (1) Regions (0) Abstract: The Emigrant Slimhole Drilling Project ('ESDP') was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included

17

2010 Reporting Year - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Coal Gasification/Liquefaction ..... Other Petroleum ..... 5111 Reporting Company Research & Development Funding and Expenditures ($000,000) 5111 14 of 49 ...

18

Accountability report - fiscal year 1997  

SciTech Connect

This document contains the US NRC`s accountability report for fiscal year 1997. Topics include uses of funds, financial condition, program performance, management accountability, and the audited financial statement.

1998-04-01T23:59:59.000Z

19

Orcas Power and Light Company [fourth quarterly] technical progress report, July--September 1992  

DOE Green Energy (OSTI)

After a year of operating the G-Van, OPALCO concluded that the company transportation needs were not being met by the G-Van. The previous quarterly report mentioned battery problems with the Solectria (No. 51). This problem is one of reduced range and power and has been determined to be caused by one or more individual monoblock failures. The local Solectria representative and Solectria headquarters personnel have been aware of this unsatisfactory condition and are continuing their attempt to solve it. The Solectria and G-Van continue to be used intermittently by company personnel for errands and engineering trips. Generally, the smaller, compact size of the Solectria make it the most preferred by company drivers. Clearly the G-Van is not selected for use because of its size and weight. It is important to note that the driver dissatisfaction is not related to the fact that it is an electric van, but more its lack of maneuverability.

Not Available

1992-12-31T23:59:59.000Z

20

Orcas Power and Light Company [fourth quarterly] technical progress report, July--September 1992  

DOE Green Energy (OSTI)

After a year of operating the G-Van, OPALCO concluded that the company transportation needs were not being met by the G-Van. The previous quarterly report mentioned battery problems with the Solectria (No. 51). This problem is one of reduced range and power and has been determined to be caused by one or more individual monoblock failures. The local Solectria representative and Solectria headquarters personnel have been aware of this unsatisfactory condition and are continuing their attempt to solve it. The Solectria and G-Van continue to be used intermittently by company personnel for errands and engineering trips. Generally, the smaller, compact size of the Solectria make it the most preferred by company drivers. Clearly the G-Van is not selected for use because of its size and weight. It is important to note that the driver dissatisfaction is not related to the fact that it is an electric van, but more its lack of maneuverability.

Not Available

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Great Western Malting Company geothermal project, Pocatello, Idaho. Final report  

DOE Green Energy (OSTI)

The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

1981-12-23T23:59:59.000Z

22

Berkeley Lab report finds U.S. energy service companies experienced...  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab report finds U.S. energy service companies experienced steady growth despite recession Berkeley Lab estimates of reported and projected ESCO industry revenues: 1990-20...

23

Westinghouse Hanford Company operational environmental monitoring annual report, CY 1992  

SciTech Connect

This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1992 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State in 1992. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and to control the impacts of nuclear facilities and waste sites on the workers and the local environment. Additionally, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although impacts from nuclear facilities are still seen on the Hanford Site and are slightly elevated when compared to offsite, these impacts are less than in previous years.

Schmidt, J.W.; Johnson, A.R.; McKinney, S.M.; Perkins, C.J.

1993-07-01T23:59:59.000Z

24

Calendar Year Reports | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

25

Baltimore Aircoil Company (BAC) ice storage test report  

DOE Green Energy (OSTI)

The Ice Storage Test Facility (ISTF) is designed to test commercial ice storage systems. Baltimore Aircoil Company (BAC) provided a storage tank equipped with coils designed for use with a liquid overfeed refrigeration system. Separate coils were also supplied for use with a secondary fluid system. The BAC ice storage system was tested over a wide range of operating conditions. System performance was satisfactory under both charging and discharging conditions. During the liquid-overfeed ice build cycle, the evaporator temperature closely matched the manufacturer's literature. The measured average brine temperatures were slightly higher than those given in the BAC literature (i.e., the BAC report is conservative). During discharge cycles, the storage tank outlet temperature remains nearly constant below 35{degree}F, rising only after most of the ice has been melted. The discharge performance was relatively unaffected by discharge rates or tank inlet temperatures. Based on these tests, a storage tank sized solely according to the latent ice storage capacity is capable of providing a relatively constant temperature to the load throughout most of the discharge cycle. This report describes BAC system performance fully under both charging and discharging conditions. Companion reports describe ISTF test procedures and ice-making efficiency test results that are common to many of the units tested. 10 refs., 30 figs., 7 tabs.

Stovall, T.K.

1991-03-01T23:59:59.000Z

26

Tampa Electric Company Polk Power Station Unit Number 1. Annual report, January--December, 1993  

Science Conference Proceedings (OSTI)

This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year`s activities associated with Tampa Electric Company`s 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.

Not Available

1994-08-01T23:59:59.000Z

27

[Tampa Electric Company IGCC project]. Final public design report; Technical progress report  

SciTech Connect

This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

NONE

1996-07-01T23:59:59.000Z

28

Intern experience at Dallas Power and Light Company: an internship report  

E-Print Network (OSTI)

A survey of the author's internship experience with the Dallas Power & Light Company during the period January, 1979 through January, 1980 is presented. During this one year internship, the author worked as an engineer in the Executive Department. The intent of this report is to demonstrate that this experience fulfills the requirements for the Doctor of Engineering internship. The author's activities during this period can be categorized into two major areas. First, technically oriented, in which he developed a model to project future electrical demands based on land usage, and a computer program that implements this model. Secondly, a selection of non-technical business oriented areas were investigated. The tasks in these areas offered him the opportunity to be exposed to the organization and operation of an investor owned public utility company and to gain experience in a non-academic business environment.

Fischer, Roger Lewis, 1945-

1980-05-01T23:59:59.000Z

29

Calendar Year Reports Archive | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Archive Calendar Year Reports Archive October 3, 2013 Special Inquiry: DOEIG-0895 Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power...

30

Vermont Marble Company, Proctor, Vermont: Otter Creek hydroelectric feasibility report  

DOE Green Energy (OSTI)

Vermont Marble Company (VMCO) owns and operates four hydroelectric projects in a 50-mile reach of Otter Creek in west central Vermont. This study concerns three of the installations - Center Rutland, Beldens, and Huntington Falls. The fourth site is known as Proctor and will be studied separately. All four plants operate as run-of-river stations, and the limited reservoir storage capacity places severe limitations on any other type of operation. The plants are presently operating at much lower outputs than can be obtained, because they do not use the available discharge and head. The results show that, under the assumptions made in this study, Beldens and Huntington Falls can be economically improved. The rehabilitation of the Center Rutland plant did not look economically attractive. However, the improvement of Center Rutland should not be eliminated from further consideration, because it could become economically attractive if the cost of energy starts escalating at a rate of around 10% per year. The study included a brief appraisal of the existing generating facilities and condition of existing concrete structures, a geological reconnaissance of the sites, analysis of the power potential, flood studies, technical and economic investigations and comparative evaluations of the alternatives for developing the streamflow for power generation, selection of the most suitable alternative, financial analysis, preparation of drawings, and preparation of detailed quantity and cost estimates.

None

1979-02-01T23:59:59.000Z

31

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Maintenance Status Report of Potomac Electric Power Company Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two 230 kV circuits from the Palmers Comer to Potomac River substations pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of

32

2010 U.S. Smart Grid Vendor Ecosystem Report on the companies...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Smart Grid Vendor Ecosystem Report on the companies and market dynamics shaping the current U.S. smart grid landscape 2010 U.S. Smart Grid Vendor Ecosystem Report on the...

33

2010 U.S. Smart Grid Vendor Ecosystem Report on the companies and market  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 U.S. Smart Grid Vendor Ecosystem Report on the companies and 0 U.S. Smart Grid Vendor Ecosystem Report on the companies and market dynamics shaping the current U.S. smart grid landscape 2010 U.S. Smart Grid Vendor Ecosystem Report on the companies and market dynamics shaping the current U.S. smart grid landscape The Smart Grid vendor ecosystem is an increasingly interdependent web of companies. Vendors of Advanced Metering Infrastructure (AMI) products (meters, communication units, and related software) have emerged as leaders in establishing cross-industry partnerships. Investments in AMI infrastructure have catalyzed new working relationships throughout the industry. 2010 U.S. Smart Grid Vendor Ecosystem Report on the companies and market dynamics shaping the current U.S. smart grid landscape More Documents & Publications

34

EMSL Fiscal Year 2008 Annual Report  

Science Conference Proceedings (OSTI)

This annual report provides details on the research conducted at EMSL--the Environmental Molecular Sciences Laboratory in Fiscal Year 2008.

Showalter, Mary Ann

2009-01-23T23:59:59.000Z

35

Hawaiian Electric Company's Sun Power for Schools Program: The First 10 Years  

Science Conference Proceedings (OSTI)

Hawaiian Electric Company (HECO) and its subsidiary utilities Hawaii Electric Light Company (HELCO) and Maui Electric Company (MECO) collectively manage a green pricing program referred to as Sun Power for Schools. The objectives of the program are to demonstrate photovoltaic (PV) technology and operations, gain experience with green pricing programs, and provide educational benefits to Hawaii’s public schools.

2009-08-28T23:59:59.000Z

36

Accountability report. Fiscal Year 1996, Volume 2  

SciTech Connect

This report consolidates several performance-related reports into a single financial management report. Information in this report includes information previously reported in the following documents: (1) US Nuclear Regulatory Commission`s (NRC`s) annual financial statement, (2) NRC Chairman`s annual report to the President and the Congress, and (3) NRC Chairman`s semiannual report to Congress on management decisions and final actions on Office of Inspector General audit recommendations. This report also contains performance measures. The report is organized into the following subtopics: information about the US NRC, program performance, management accountability, and the audited financial statement for Fiscal Year 1996. 19 figs., 4 tabs.

1997-05-01T23:59:59.000Z

37

Berkeley Lab report finds U.S. energy service companies experienced...  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab report finds U.S. energy service companies experienced steady growth despite recession Click here to view this video Date: September 25, 2013 Presenter(s): Elizabeth...

38

Towards an Improved Environmental Reporting Structure for Companies in Food and Agribusiness Chains  

E-Print Network (OSTI)

The present paper focuses on the perceived quality of information exchange between government and business (G2B) in the field of environmental reporting in the Dutch agri-food industry. It seems most important for environmental performance enhancement (a concept that includes the quality of information given to stakeholders in our view) that companies are entangled in a network of intermediary institutions (branch organizations, covenants, existence of chain leaders etc.). It seems that that these mediating institutions are very instrumental in `translating' the governmental `message' to the companies. The companies choose the (related to the development of internal care) improvement of electronic reporting as the most promising innovation for the G2B communication. This shows that the companies still have a long way to go towards chain oriented care systems.

Harry Bremmers And; Harry J. Bremmers

2003-01-01T23:59:59.000Z

39

Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996  

SciTech Connect

This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

1998-02-01T23:59:59.000Z

40

Westinghouse Hanford Company health and safety performance report  

SciTech Connect

Topping the list of WHC Safety recognition during this reporting period is a commendation received from the National Safety Council (NSC). The NSC bestowed their Award of Honor upon WHC for significant reduction of incidence rates during CY 1995. The award is based upon a reduction of 48 % or greater in cases involving days away from work, a 30 % or greater reduction in the number of days away, and a 15% or greater reduction in the total number of occupational injuries and illnesses. (page 2-1). A DOE-HQ review team representing the Office of Envirorunent, Safety and Health (EH), visited the Hanford Site during several weeks of the quarter. Ile 40-member Safety Management Evaluation Team (SMET) assessed WHC in the areas of management responsibility, comprehensive requirements, and competence commensurate with responsibility. As part of their new approach to oversight, they focused on the existence of management systems and programs (comparable approach to VPP). Plant/project areas selected for review within WHC were PFP, B Plant/WESF, Tank Farms, and K-Basins (page 2-2). Effective safety meetings, prejob safety meetings, etc., are a cornerstone of any successful safety program. In an effort to improve the reporting of safety meetings, the Safety/Security Meeting Report form was revised. It now provides a mechanism for recording and tracking safety issues (page 2-4). WHC has experienced an increase in the occupational injury and illness incidence rates during the first quarter of CY 1996. Trends show this increase can be partially attributed to inattention to workplace activities due 0999to the uncertainty Hanford employees currently face with recent reduction of force, reorganization, and reengineering efforts (page 2-7). The cumulative CY 1995 lost/restricted workday case incidence rate for the first quarter of CY 1996 (1.28) is 25% below the DOE CY 1991-93 average (1.70). However, the incidence rate increased 24% from the CY 1995 rate of 1.03 (page 2-8). The reengineering of the Radiological Control organization has resulted in an increase in the availability of personnel to help facilities with the procurement and use of practical ALARA measures. In addition, there seems to be more awareness of the need to use ALARA, resulting in a significant increase in the number of calls received by the ALARA Program Office for help in solving radiological problems (page 1-3). The Figure 3-2-1 chart data includes WHC, BCSR, and ICF KH employee exposure. The first quarter CY 1996 results represent the exposure of 1,913 quarterly-badged employees and an average of 846 monthly-badged employees. There were three instances of potential loss of contamination control during the calendar quarter involving three workers where internal dosimetry follow-up was performed. No intakes of contamination were detected (page 3-6). There were five skin contaminations and 18 clothing contaminations reported during this quarter in all WHC-managed facilities/areas. This represents an improvement in performance compared to the first quarter of CY 1995 (page 3-9). A monthly average of 76 Radiological Problem Reports (RPR) was issued during the first quarter of CY 1996 for a total issuance of 227 RPRS. The monthly average for the same quarter in CY 1995 was 76; a total of 228 for the quarter (Figure 3-5-1). At the end of March, WHC Dosimetry was monitoring the following employees/sub- contractors: 631 monthly standard dosimeters, 251 monthly combination dosimeters, 1,386 quarterly standard dosimeters, 472 quarterly combination dosimeters, and 3,716 annual dosimeters. During this period, Dosimetry had 987 requests for changes to the frequency, and terminated 731 dosimetry records.

Rogers, L.

1996-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Tampa Electric Company, Polk Power Station Unit No. 1, preliminary public design report  

Science Conference Proceedings (OSTI)

This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE`s project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

NONE

1994-06-01T23:59:59.000Z

42

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

43

EMSL Fiscal Year 2008 Annual Report  

NLE Websites -- All DOE Office Websites (Extended Search)

8186 8186 EMSL Fiscal Year 2008 Annual Report MA Showalter January 2009 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 EMSL-the Environmental Molecular Sciences Laboratory 2008 Annual Report iii Contents 1 Overview ............................................................................................. 1-1-1 Science Themes ..................................................................................................................... 1-1-5 Proposals and Scientific User Access Modes ................................................................... 1-1-5 EMSL Scientific Grand Challenge ..................................................................................... 1-1-8

44

EJ first year report.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Justice Five-Year Implementation Plan First Annual Progress Report ENERGY U.S. DEPARTMENT OF 1 Melinda Downing Environmental Justice Program Manager Foreword The Department of Energy's (DOE) (Plan) sets an ambitious Departmental agenda that will guide our environmental justice (EJ) activities for five years. It sets forth an aggressive agenda, and is required to do so if we are to meet the demands that are spelled out in Presidential Executive Order 12898 and the Department's (Strategy). This is the first plan of this nature that the Department has developed. All programs, offices and activities have contributed to the work efforts to insure that we meet the Department's EJ goals and aspirations during the Plan years and beyond. When the Deputy Secretary of Energy released the DOE at the second annual The State of Environmental Justice in America 2008 Conference

45

Waste management fiscal year 1998 progress report  

SciTech Connect

The Waste Management Program is pleased to issue the Fiscal Year 1998 Progress Report presenting program highlights and major accomplishments of the last year. This year-end update describes the current initiatives in waste management and the progress DOE has made toward their goals and objectives, including the results of the waste management annual performance commitments. One of the most important program efforts continues to be opening the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, for the deep geologic disposal of transuranic waste. A major success was achieved this year by the West Valley Demonstration Project in New York, which in June completed the project`s production phase of high-level waste processing ahead of schedule and under budget. Another significant accomplishment this year was the award of two privatization contracts for major waste management operations, one at Oak ridge for transuranic waste treatment, and one at Hanford for the Tank Waste Remediation System privatization project. DOE is proud of the progress that has been made, and will continue to pursue program activities that allow it to safely and expeditiously dispose of radioactive and hazardous wastes across the complex, while reducing worker, public, and environmental risks.

1998-12-31T23:59:59.000Z

46

Site environmental report for calendar year 1996  

Science Conference Proceedings (OSTI)

This Annual Site Environmental Report presents information pertaining to environmental activities conducted during calendar year 1996 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN-Grand Junction, the Facility Operations and Support contractor for the GJO, prepared this report in accordance with the requirements of DOE Order 5400.1, General Environmental Protection Program, and supplemental guidance from DOE Headquarters. This report applies specifically to the GJO facility; the Monticello Mill Tailings Site Environmental Summary for Calendar Year 1996 was prepared as a separate document. Primary GJO activities involve laboratory analysis of environmental samples from GJO and other DOE sites and site remediation of contamination caused by previous uranium mill operations. Activities at the GJO are conducted in compliance with applicable Federal, State, and local regulations and requirements and as directed by applicable DOE orders. Environmental monitoring is performed on air emissions, sewer effluent, surface water and groundwater, and wetlands restoration. Wastes are generated from the Analytical Laboratory, site remediation, and facility operation.

NONE

1997-06-01T23:59:59.000Z

47

Annual Site Environmental Report Calendar Year 2007  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

Dan Kayser-Ames Laboratory

2007-12-31T23:59:59.000Z

48

Kansas City Power & Light Company Smart Grid Host Site 2011 Progress Report  

Science Conference Proceedings (OSTI)

The Kansas City Power & Light Company (KCP&L) SmartGrid Demonstration Project is a component of an EPRI multi-year collaborative initiative with utility participants. The project focuses on integrating distributed energy resources (DER)such as demand response, storage, and distributed and renewable generationinto a virtual power plant. The ultimate goal is to advance widespread, efficient, and cost-effective deployment of utility and customer-side technologies in distribution and overall power system ope...

2012-02-28T23:59:59.000Z

49

Fusion Safety Program annual report, Fiscal Year 1993  

Science Conference Proceedings (OSTI)

This report summarizes the major activities of the Fusion Safety Program in Fiscal Year 1993. The Idaho National Engineering Laboratory (INEL) has been designated by DOE as the lead laboratory for fusion safety, and EG&G Idaho, Inc., is the prime contractor for INEL operations. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations, including universities and private companies. Technical areas covered in the report include tritium safety, beryllium safety, activation product release, reactions involving potential plasma-facing materials, safety of fusion magnet systems, plasma disruptions and edge physics modeling, risk assessment failure rates, computer codes for reactor transient analysis, and regulatory support. These areas include work completed in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed at the INEL for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor projects at the Princeton Plasma Physics Laboratory and a summary of the technical support for the ARIES/PULSAR commercial reactor design studies.

Longhurst, G.R.; Cadwallader, L.C.; Dolan, T.J.; Herring, J.S.; McCarthy, K.A.; Merrill, B.J.; Motloch, C.G.; Petti, D.A.

1993-12-01T23:59:59.000Z

50

Site Environmental Report-Calendar Year 2001  

Science Conference Proceedings (OSTI)

The Laboratory's mission is to conduct fundamental research in the physical, chemical, materials, mathematical sciences and engineering which underlie energy generating, conversion, transmission and storage technologies, environmental improvement, and other technical areas essential to national needs. These efforts will be maintained so as to contribute to the achievement of the Department of Energy's Missions and Goals; more specifically, to increase the general levels of scientific knowledge and capabilities, to prepare engineering and physical sciences students for future scientific endeavors, and to initiate nascent technologies and practical applications arising from our basic scientific programs. The Laboratory will approach all its operations with the safety and health of all workers as a constant objective and with genuine concern for the environment. Ames Laboratory does not conduct classified research. The primary purpose of this report is to summarize the performance of Ames Laboratory's environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2001. This report is a working requirement of Department of Energy Order 231.1, Environment, Safety, and Health Reporting''.

Dan Kayser

2002-09-03T23:59:59.000Z

51

Annual Site Environmental Report Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

Kayser, Dan

2011-01-31T23:59:59.000Z

52

Fiscal Year 2008 Annual Federal Performance Report On Executive...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Federal Performance Report On Executive Agency Actions To Assist Historically Black Colleges And Universities Fiscal Year 2008 Annual Federal Performance Report On...

53

Microsoft Word - RFOLF Yearly Report - 2013_TAC  

Office of Legacy Management (LM)

801 801 Automation Way Suite 100 Fort Collins CO 80525 Tel 970.223.9600 Fax 970.223.7171 www.tetratech.com Technical Memorandum To: Mr. Rick DiSalvo From: Lance Heyer, EI Thomas A. Chapel, PE Company: S. M. Stoller Corporation Date: March 29, 2013 Re: Instrumentation and Monitoring, Rocky Flats OLF Tt Project #: 114-181750 Introduction This technical memorandum provides a summary and evaluation of data collected from inclinometer and piezometer instrumentation at the Rocky Flats Original Landfill (OLF). Previously collected data has been updated with information collected during 2012 and the beginning of 2013. Data from piezometers located on the outside of the inclinometer casings were also reviewed and evaluated for possible correlation with the inclinometer data. Background information regarding the results of the geotechnical investigation conducted in 2008 (Tetra

54

PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3  

SciTech Connect

The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

Layfield, K.A.

1998-09-02T23:59:59.000Z

55

AISI-DOE Direct Steelmaking Program. Annual report for the year ending November 30, 1993  

SciTech Connect

This program has completed its 5th year since cost-share funding provided by DOE. The following tasks are reported on: budget, patents, talks, and publications; design and construction of gas cleaning and tempering loop; construction of pressurized smelter and operation of combined smelter and offgas system; study for ironmaking demonstration plant and for steelmaking processes; and laboratory research programs at universities and companies.

Aukrust, E.

1994-02-01T23:59:59.000Z

56

Hanford Site Environmental Report for Calendar Year 2001  

SciTech Connect

This report summarizes environmental information for the Hanford Site in Washington State for the calendar year 2001.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2002-09-02T23:59:59.000Z

57

Year 2 Report: Protein Function Prediction Platform  

SciTech Connect

Upon completion of our second year of development in a 3-year development cycle, we have completed a prototype protein structure-function annotation and function prediction system: Protein Function Prediction (PFP) platform (v.0.5). We have met our milestones for Years 1 and 2 and are positioned to continue development in completion of our original statement of work, or a reasonable modification thereof, in service to DTRA Programs involved in diagnostics and medical countermeasures research and development. The PFP platform is a multi-scale computational modeling system for protein structure-function annotation and function prediction. As of this writing, PFP is the only existing fully automated, high-throughput, multi-scale modeling, whole-proteome annotation platform, and represents a significant advance in the field of genome annotation (Fig. 1). PFP modules perform protein functional annotations at the sequence, systems biology, protein structure, and atomistic levels of biological complexity (Fig. 2). Because these approaches provide orthogonal means of characterizing proteins and suggesting protein function, PFP processing maximizes the protein functional information that can currently be gained by computational means. Comprehensive annotation of pathogen genomes is essential for bio-defense applications in pathogen characterization, threat assessment, and medical countermeasure design and development in that it can short-cut the time and effort required to select and characterize protein biomarkers.

Zhou, C E

2012-04-27T23:59:59.000Z

58

FTCP Annual Report - Fiscal Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 FTCP Annual Report - Fiscal Year 2004 The U.S. Department of Energy (DOE) is committed to ensuring employees are trained and technically capable of performing their duties. In pursuit of this objective, the Secretary of Energy issued DOE Policy 426.1, Federal Technical Capability Policy for Defense Nuclear Facilities, to institutionalize the Federal Technical Capability Program. Report summarizes the yearly actions taken to ensure organizations maintain their critical technical capabilities needed for the safe operations of defense nuclear facilities. FTCP 2004 Annual Report More Documents & Publications FTCP Annual Plan - Fiscal Year 2005 Technical Qualification Program Self-Assessment Report - Sandia Site Office FTCP Annual Report - Calendar Year 2007

59

Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1992. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, only the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded, on occasion only, the fecal and total coliform concentration limits at the discharge point. This was later attributed to off-site Contractor Laboratory quality assurance problems. The environmental monitoring data has continued to demonstrate, besides the site specific contamination of ground water and soil resulting from past operations, that compliance was achieved with environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

1993-05-01T23:59:59.000Z

60

Environmental monitoring report for Calendar Year 1986  

Science Conference Proceedings (OSTI)

The results of the 1986 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Large Torus (PLT) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. The Princeton Beta Experiment (PBX) was shut down in December 1985 to undergo major modifications, and will recommence operations in 1987. PLT was shut down in December 1986. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1986. The Environmental Committee became a standing committee of the Executive Safety Board (ESB) and continued to review items of environmental importance. During CY86 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations.

Stencel, J.R.

1987-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Procurement Organization, Sandia National Laboratories. Annual report, fiscal year 1995  

Science Conference Proceedings (OSTI)

This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1995. Activities for both the New Mexico and California locations are included.

Stimak, D.R.

1996-05-01T23:59:59.000Z

62

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010  

Science Conference Proceedings (OSTI)

This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

2010-02-04T23:59:59.000Z

63

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources.

NONE

1995-11-01T23:59:59.000Z

64

Department of Energy electric and hybrid vehicle site operator program at Pacific Gas and Electric Company. Final report  

DOE Green Energy (OSTI)

Pacific Gas & Electric Company continues to expand an EV program that addresses the following: vehicle development and demonstration; vehicle technology assessment; infrastructure evaluation; participation in EV organizations; and meetings and events. This report highlights PG & E`s activities in each of these areas.

NONE

1997-10-01T23:59:59.000Z

65

Fiscal Year 2008 Annual Federal Performance Report On Executive Agency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fiscal Year 2008 Annual Federal Performance Report On Executive Fiscal Year 2008 Annual Federal Performance Report On Executive Agency Actions To Assist Historically Black Colleges And Universities Fiscal Year 2008 Annual Federal Performance Report On Executive Agency Actions To Assist Historically Black Colleges And Universities Packet of information to the Secretary of Education Fiscal Year 2008 Annual Federal Performance Report On Executive Agency Actions To Assist Historically Black Colleges And Universities More Documents & Publications Minority Serving Institutions (MSIs): Bridging the Gap between Federal Agencies and MSIs Office of Energy Efficiency and Renewable Energy (EERE) -Historically Black Colleges and Universities 12 Annual Small Business Conference & Expo Minority Serving Institutions (MSIs)-Bridging the Gap Between Federal Agencies and MSIs

66

Environmental Molecular Sciences Laboratory Annual Report: Fiscal Year 2006  

Science Conference Proceedings (OSTI)

This report describes the activities and research performed at the Environmental Molecular Sciences Laboratory, a Department of Energy national scientific user facility at Pacific Northwest National Laboratory, during Fiscal Year 2006.

Foster, Nancy S.; Showalter, Mary Ann

2007-03-23T23:59:59.000Z

67

Annual Waste Minimization Summary Report, Calendar Year 2008  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2008.

NSTec Environmental Management

2009-02-01T23:59:59.000Z

68

Hanford Site Environmental Report for Calendar Year 2003  

SciTech Connect

This report is published each year by DOE to summarize environmental data and information, describe environmental management performance, demonstrate the status of compliance with environmental regulations, and highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2004-09-01T23:59:59.000Z

69

Better Buildings Challenge Reports First Year's Savings; Partners on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Challenge Reports First Year's Savings; Partners Challenge Reports First Year's Savings; Partners on Track to Meet 2020 Goal Better Buildings Challenge Reports First Year's Savings; Partners on Track to Meet 2020 Goal May 22, 2013 - 12:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - Today, Energy Secretary Ernest Moniz recognized the Administration's Better Buildings Challenge partners for the first year's progress toward our goal of making American commercial and industrial buildings 20 percent more energy efficient by 2020. Today's announcement builds upon Secretary Moniz's first speech as Secretary at the 2013 Energy Efficiency Global Forum yesterday which focused on his commitment to saving energy. New data submitted by the Challenge partners shows that they have improved facility energy efficiency by more than 2.5 percent per year on average

70

Wind system interconnected with the Public Service Company at Deming, New Mexico. Final report  

Science Conference Proceedings (OSTI)

In cooperation with the Public Service Company of New Mexico (PNM), the New Mexico Solar Energy Institute fieldtested a 25-kilowatt wind generator in Deming, New Mexico. The wind generator, manufactured by Carter Wind Systems, helped power an irrigation load. Wind speed, pump load, wind-generator power output, power fed into the PNM line, and reactive power requirements of pump and wind generator were monitored and recorded on magnetic tape. The wind generator produced a total of 28,997 kilowatt hours between August 1981 and December 1983. The capacity factor for that period was 6.6%. The average wind speed was lower than anticipated - 6.18 miles per hour versus 10 miles per hour recorded during five previous years. Total downtime of the wind generator was 13.5%. Power curves were measured and show a cut-in speed of between seven and eight miles per hour (manufacturer's specification: 7.5 mph) and a maximum 15-minute average power output of 21.5 kilowatts. The wind generator produced power 54.7% of the time. It supplied 4.2% of the irrigation load at the site. There is no good match between the irrigation load peak in June and July and the wind resource, which peaks in March and April. Wind-assisted irrigation may, therefore, not be feasible for the Deming area. Considering the low wind resource during the project period, the wind generator performed well and reliably. No problems were encountered in operating the wind system parallel to the utility line.

Schoenmackers, R.

1984-08-01T23:59:59.000Z

71

OCRWM annual report to Congress, fiscal year 1997  

SciTech Connect

This report presents the progress in the activities of the Office of Civilian Radioactive Waste Management. Chapters include: Yucca Mountain site characterization project; Waste acceptance, storage and transportation project; Program management; Working with external parties; and Financial management. Also included in five appendices are: financial statements; key federal laws and regulations; fiscal year 1997 Congressional testimony and meetings with regulators and oversight bodies; OCREM publications for fiscal year 1997; and selected publications from other organizations during fiscal year 1997.

1998-07-01T23:59:59.000Z

72

Status Company Terminal Term  

NLE Websites -- All DOE Office Websites (Extended Search)

Status of Short-Term Applications to Export Previously Imported LNG (as of March 5, 2013) Status Company Terminal Term (Years) Authorized Volume (Equivalent Bcf in natural gas)...

73

Better Buildings Challenge Reports First Year's Savings; Partners on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Better Buildings Challenge Reports First Year's Savings; Partners Better Buildings Challenge Reports First Year's Savings; Partners on Track to Meet 2020 Goal Better Buildings Challenge Reports First Year's Savings; Partners on Track to Meet 2020 Goal May 22, 2013 - 12:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - Today, Energy Secretary Ernest Moniz recognized the Administration's Better Buildings Challenge partners for the first year's progress toward our goal of making American commercial and industrial buildings 20 percent more energy efficient by 2020. Today's announcement builds upon Secretary Moniz's first speech as Secretary at the 2013 Energy Efficiency Global Forum yesterday which focused on his commitment to saving energy. New data submitted by the Challenge partners shows that they have improved

74

Westinghouse Hanford Company health and safety performance report. Fourth quarter calendar year 1994  

Science Conference Proceedings (OSTI)

Detailed information pertaining to As Low As Reasonably Achievable/Contamination Control Improvement Project (ALARA/CCIP) activities are outlined. Improved commitment to the WHC ALARA/CCIP Program was experienced throughout FY 1994. During CY 1994, 17 of 19 sitewide ALARA performance goals were completed on or ahead of schedule. Estimated total exposure by facility for CY 1994 is listed in tables by organization code for each dosimeter frequency. Facilities/areas continue to utilize the capabilities of the RPR tracking system in conjunction with the present site management action-tracking system to manage deficiencies, trend performance, and develop improved preventive efforts. Detailed information pertaining to occupational injuries/illnesses are provided. The Industrial Safety and Hygiene programs are described which have generated several key initiatives that are believed responsible for improved safety performance. A breakdown of CY 1994 occupational injuries/illnesses by type, affected body group, cause, job type, age/gender, and facility is provided. The contributing experience of each WHC division/department in attaining this significant improvement is described along with tables charting specific trends. The Radiological Control Program is on schedule to meet all RL Site Management System milestones and program commitments.

Lansing, K.A.

1995-03-01T23:59:59.000Z

75

Annual Site Environmental Report for Calendar Years 2009 to 2010  

SciTech Connect

This report presents the results of environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Years 2009-2010. The report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are released into the environment as a result of PPPL operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2009-2010. The objective of the Site Environmental Report is to document PPPL's efforts to protect the public's health and the environment through its environmental protection, safety, and health programs. __________________________________________________

Virginia Finley

2012-08-08T23:59:59.000Z

76

Fusion safety program Annual report, Fiscal year 1995  

Science Conference Proceedings (OSTI)

This report summarizes the major activities of the Fusion Safety Program in FY-95. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory, and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions. Among the technical areas covered in this report are tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate database development, and safety code development and application to fusion safety issues. Most of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and the technical support for commercial fusion facility conceptual design studies. A final activity described is work to develop DOE Technical Standards for Safety of Fusion Test Facilities.

Longhurst, G.R.; Cadwallader, L.C.; Carmack, W.J. [and others

1995-12-01T23:59:59.000Z

77

COMPANY PROPRIETARY INFORMATION  

Due Dates: August 31 Period ending June 30 February 28 Period ending December 31 COMPANY PROPRIETARY INFORMATION ROYALTY REPORT AFTER FIRST SALE ...

78

Environmental Asset Management Study: Case Study Report for Sierra Pacific and Nevada Power Company  

Science Conference Proceedings (OSTI)

A key challenge for utility managers is to assess the value of their environmental resources and manage them as they would any other critical business asset. This case study describes how two companies in the process of merging addressed that challenge.

1999-08-26T23:59:59.000Z

79

Southwestern Public Service Company Solar Repowering Program. Volume 1. Conceptual design and evaluation. Final technical report  

DOE Green Energy (OSTI)

The detailed conceptual design, subsystem characteristics, economic analysis, development plan, and user's assessment of repowering Southwest Public Service Company's Plant X located south of Amarillo, Texas, with a tower focus power plant are presented. The plant will utilize liquid sodium heat transfer fluids, thermal storage tanks, and a steam generator/turbine. Detailed economic and cost data are included. (WHK)

Not Available

1980-07-01T23:59:59.000Z

80

Safety and Health Asset Management Study: Case Study Report for Sierra Pacific and Nevada Power Company  

Science Conference Proceedings (OSTI)

A key challenge for utility managers is to assess the value of their safety and health resources and manage them as they would any other critical business asset. This case study describes how two companies in the process of merging addressed that challenge.

1999-08-27T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Generic Disposal System Modeling, Fiscal Year 2011 Progress Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disposal System Modeling, Fiscal Year 2011 Progress Report Disposal System Modeling, Fiscal Year 2011 Progress Report Generic Disposal System Modeling, Fiscal Year 2011 Progress Report The UFD Campaign is developing generic disposal system models (GDSM) of different disposal environments and waste form options. Currently, the GDSM team is investigating four main disposal environment options: mined repositories in three geologic media (salt, clay, and granite) and the deep borehole concept in crystalline rock (DOE 2010d). Further developed the individual generic disposal system (GDS) models for salt, granite, clay, and deep borehole disposal environments. GenericDisposalSystModelFY11.pdf More Documents & Publications Integration of EBS Models with Generic Disposal System Models TSPA Model Development and Sensitivity Analysis of Processes Affecting

82

DOE KSU EV Site Operator Program. Year 1, fourth quarter report, April 1--June 30, 1992  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter`s report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-08-01T23:59:59.000Z

83

Office of Packaging and Transportation Fiscal Year 2012 Annual Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Packaging and Transportation Fiscal Year 2012 Annual Packaging and Transportation Fiscal Year 2012 Annual Report Office of Packaging and Transportation Fiscal Year 2012 Annual Report The Office of Environmental Management (EM) was established to mitigate the risks and hazards posed by the legacy of nuclear weapons production and research. The most ambitious and far ranging of these missions is dealing with the environmental legacy of the Cold War. Many problems posed by its operations are unique, and include the transportation of unprecedented amounts of contaminated waste, water, and soil, and a vast number of contaminated structures during remediation of the contaminated sites. Since Fiscal Year (FY) 2004, EM has completed over 150,000 shipments of radioactive material and waste. The mission of the Department of Energy (DOE) Office of Packaging and

84

Ecological Monitoring and Compliance Program Fiscal Year 2003 Report  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

Bechtel Nevada

2003-12-01T23:59:59.000Z

85

Annual Waste Minimization Summary Report Calendar Year 2007  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year (CY) 2007. This report was developed in accordance with the requirements of the Nevada Test Site (NTS) Resource Conservation and Recovery Act (RCRA) Permit (number NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by the NNSA/NSO and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by the NNSA/NSO.

NSTec Environmental Management

2008-02-01T23:59:59.000Z

86

The GEO-SEQ Project: First-Year Status Report  

NLE Websites -- All DOE Office Websites (Extended Search)

GEO-SEQ PROJECT: FIRST-YEAR STATUS REPORT GEO-SEQ PROJECT: FIRST-YEAR STATUS REPORT Sally M. Benson and Larry Myer Earth Sciences Division Ernest Orlando Lawrence Berkeley National Laboratory Berkeley, California 94720 smbenson@lbl.gov ABSTRACT The GEO-SEQ Project is a public-private applied R&D partnership, formed with the goal of developing the technology and information needed to enable safe and cost-effective geologic sequestration by the year 2015. The effort, supported by the U.S. Department of Energy s (DOE s) National Energy Technology Laboratory, involves Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Oak Ridge National Laboratory, Stanford University, the U.S. Geological Survey, the Texas Bureau of Economic Geology, the Alberta Research Council, and five private-sector partners

87

Regional forecasting with global atmospheric models; Third year report  

SciTech Connect

This report was prepared by the Applied Research Corporation (ARC), College Station, Texas, under subcontract to Pacific Northwest Laboratory (PNL) as part of a global climate studies task. The task supports site characterization work required for the selection of a potential high-level nuclear waste repository and is part of the Performance Assessment Scientific Support (PASS) Program at PNL. The work is under the overall direction of the Office of Civilian Radioactive Waste Management (OCRWM), US Department of Energy Headquarters, Washington, DC. The scope of the report is to present the results of the third year`s work on the atmospheric modeling part of the global climate studies task. The development testing of computer models and initial results are discussed. The appendices contain several studies that provide supporting information and guidance to the modeling work and further details on computer model development. Complete documentation of the models, including user information, will be prepared under separate reports and manuals.

Crowley, T.J.; North, G.R.; Smith, N.R. [Applied Research Corp., College Station, TX (United States)

1994-05-01T23:59:59.000Z

88

MONTHLY UPDATE TO ANNUAL ELECTRIC GENERATOR REPORT|Year:  

U.S. Energy Information Administration (EIA) Indexed Site

REPORT|Year: REPORT|Year: 2013 OMB No. 1905-0129 Approval Expires: 12/31/2015 Burden: 0.3 Hours| |NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and disclosure information, see the provisions stated on the last page of the instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.| |SCHEDULE 1. IDENTIFICATION| |Survey Contact| |Name:__________________________________________|Title:___________________________________________|

89

Laboratory directed research development annual report. Fiscal year 1996  

SciTech Connect

This document comprises Pacific Northwest National Laboratory`s report for Fiscal Year 1996 on research and development programs. The document contains 161 project summaries in 16 areas of research and development. The 16 areas of research and development reported on are: atmospheric sciences, biotechnology, chemical instrumentation and analysis, computer and information science, ecological science, electronics and sensors, health protection and dosimetry, hydrological and geologic sciences, marine sciences, materials science and engineering, molecular science, process science and engineering, risk and safety analysis, socio-technical systems analysis, statistics and applied mathematics, and thermal and energy systems. In addition, this report provides an overview of the research and development program, program management, program funding, and Fiscal Year 1997 projects.

1997-05-01T23:59:59.000Z

90

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

91

Laboratory Directed Research and Development Annual Report - Fiscal Year 2000  

Science Conference Proceedings (OSTI)

The projects described in this report represent the Laboratory's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides, a) a director's statement, b) an overview of the laboratory's LDRD program, including PNNL's management process and a self-assessment of the program, c) a five-year project funding table, and d) project summaries for each LDRD project.

Fisher, Darrell R.; Hughes, Pamela J.; Pearson, Erik W.

2001-04-01T23:59:59.000Z

92

Cooperative Research and Development Agreement between the California Air Resources Board and Lockheed Martin Idaho Technologies Company. Final report  

DOE Green Energy (OSTI)

This report summarizes the activities under a Cooperative Research and Development Agreement (CRADA) between Lockheed-Martin Idaho Technologies Company (LMITCO) and the California Air Resources Board (CARB). The activities were performed at the Idaho National Engineering and Environmental Laboratory (INEEL) between June 1995 and December 1997. Work under this agreement was concentrated in two task areas as defined in the California Air Resources Board`s contract number 94-908 having an approval date of June 9, 1995: Task 1--EV and HEV Vehicle Testing and Assessment and Task 4--Advanced Battery Testing.

Cole, G.H.

1998-04-01T23:59:59.000Z

93

Hanford Facility Annual Dangerous Waste Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

Hanford CY 2002 dangerous waste generation and management forms. The Hanford Facility Annual Dangerous Waste Report (ADWR) is prepared to meet the requirements of Washington Administrative Code Sections 173-303-220, Generator Reporting, and 173-303-390, Facility Reporting. In addition, the ADWR is required to meet Hanford Facility RCRA Permit Condition I.E.22, Annual Reporting. The ADWR provides summary information on dangerous waste generation and management activities for the Calendar Year for the Hanford Facility EPA ID number assigned to the Department of Energy for RCRA regulated waste, as well as Washington State only designated waste and radioactive mixed waste. The Solid Waste Information and Tracking System (SWITS) database is utilized to collect and compile the large array of data needed for preparation of this report. Information includes details of waste generated on the Hanford Facility, waste generated offsite and sent to Hanford for management, and other waste management activities conducted at Hanford, including treatment, storage, and disposal. Report details consist of waste descriptions and weights, waste codes and designations, and waste handling codes. In addition, for waste shipped to Hanford for treatment and/or disposal, information on manifest numbers, the waste transporter, the waste receiving facility, and the original waste generators are included. In addition to paper copies, electronic copies of the report are also transmitted to the regulatory agency.

FREEMAN, D.A.

2003-02-01T23:59:59.000Z

94

[Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996  

SciTech Connect

Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

NONE

1997-12-31T23:59:59.000Z

95

Ecological Monitoring and Compliance Program Fiscal Year 1999 Report  

Science Conference Proceedings (OSTI)

The Ecological and Compliance program, funded through the U. S. Department of Energy, Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1999. Program activities included: (1) biological surveys at proposed construction sites (2) desert tortoise compliance (3) ecosystem mapping (4) sensitive species and unique habitat monitoring and (5) biological monitoring at the HAZMAT Spill Center.

Cathy A. Wills

1999-12-01T23:59:59.000Z

96

Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2005; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2006-09-28T23:59:59.000Z

97

Hanford Site Environmental Report for Calendar Year 2004  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2003; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

2005-09-29T23:59:59.000Z

98

Advanced Automotive Technologies annual report to Congress, fiscal year 1996  

DOE Green Energy (OSTI)

This annual report serves to inform the United States Congress on the progress for fiscal year 1996 of programs under the Department of Energy`s Office of Advanced Automotive Technologies (OAAT). This document complies with the legislative requirement to report on the implementation of Title III of the Automotive Propulsion Research and Development Act of 1978. Also reported are related activities performed under subsequent relevant legislation without specific reporting requirements. Furthermore, this report serves as a vital means of communication from the Department to all public and private sector participants. Specific requirements that are addressed in this report are: Discussion of how each research and development contract, grant, or project funded under the authority of this Act satisfies the requirements of each subsection; Current comprehensive program definition for implementing Title III; Evaluation of the state of automotive propulsion system research and development in the United States; Number and amount of contracts and grants awarded under Title III; Analysis of the progress made in developing advanced automotive propulsion system technology; and Suggestions for improvements in automotive propulsion system research and development, including recommendations for legislation.

NONE

1998-03-01T23:59:59.000Z

99

Hanford Site Environmental Surveillance Data Report for Calendar Year 2008  

SciTech Connect

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2009-08-11T23:59:59.000Z

100

Hanford Site Environmental Surveillance Data Report for Calendar Year 2007  

Science Conference Proceedings (OSTI)

Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2007" (PNNL-17603), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

Bisping, Lynn E.

2008-10-13T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Tampa Electric Company IGCC Project. Quarterly report, April 1 - June 30, 1996  

SciTech Connect

Tampa Electric Company continued efforts to complete construction and start-up of the Polk Power Station, Unit {number_sign}1 which will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. From an overall standpoint, the Project continues to track well. The completion of construction system turnovers to Start-up is encouraging. Start-up will accept responsibility of the plant until turnover to operations. The major focus continues to be on the production of first Syngas, scheduled for July 17. All construction, engineering, and start-up activities are in support of Syngas production. Key activities toward this goal include final checkout and startup of remaining gasification systems, completion of punch list items required for first syngas, finalization of operating procedures, preparation of site and area access control plans, site- wide safety training, and other Process Safety management (PSM) requirements.

1996-12-31T23:59:59.000Z

102

Health-hazard evaluation report HETA 85-018-1759, American Crystal Sugar Company, Moorhead, Minnesota  

SciTech Connect

A sugar-beet mill owned by the American Crystal Sugar Company (ACSCO) was evaluated for worker exposure to airborne contaminants during beet processing and welding fumes during facility maintenance, following a request from ACSCO management and the American Federation of Grain Millers International Union. Total and respirable dusts were measured in personal and general air samples, and personal welding filter samples were analyzed. Analytical methods included spectroscopy, x-ray diffraction, gravimetry, and chromatography. Quartz was detected in settled dust and high volume air samples; beet pulp was considered to be a potential health risk. Exposures in excess of the most stringent environmental criteria were found for calcium-oxide in lime kiln workers, formaldehyde in diffuser area workers, and total welding fumes, nickel, and iron-oxide during welding operations. Exposures to nickel and formaldehyde presented potential cancer risks. The authors recommend formaldehyde replacement, particulate containment, ventilation improvement, and use of appropriate respiratory protection.

Almaguer, D.; Boiano, J.M.

1986-12-01T23:59:59.000Z

103

Small business report to Congress for fiscal year 1992  

SciTech Connect

This report describes the various programs of the Office of Small and Disadvantaged Business Utilization designed to ensure small businesses have an equitable opportunity to do business with the Department of Energy. In addition, this report covers 33 organizational components of the Department and details the extent to which small business firms are participating in the procurement process as well as efforts taken to ensure continued involvement. During fiscal year 1992, the Department met or exceeded its percentage and dollar goals for 8(a) concerns, labor surplus area set-asides, and for-subcontracting to small businesses. The Department`s contract awards to small businesses totaled $3.1 billion (17.3 percent of the 18.1 billion the Department spent on contracts), which consisted of Departmental prime contracts and management and operating contracts. During fiscal year 1992, the Department awarded contracts totaling $307 million to small disadvantaged businesses under Section 8(a) of the U.S. Small Business Act. This total represents 1.7 percent of all prime contracts over $25,000 awarded by the Department during that period. The Department and its management and operating contractors awards to women-owned businesses and labor surplus area set-asides totaled $327 million and $596 million, respectively. The achievements in small business subcontracting for fiscal year 1992 was $234 million, including $23 million to small disadvantaged firms.

1994-02-01T23:59:59.000Z

104

Brookhaven National Laboratory site environmental report for calendar year 1990  

SciTech Connect

Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance.

Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

1992-01-01T23:59:59.000Z

105

ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT  

Science Conference Proceedings (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

BECHTEL NEVADA ECOLOGICAL SERVICES

2006-03-01T23:59:59.000Z

106

Geothermal Injection Technology Program: Annual progress report, Fiscal Year 1986  

DOE Green Energy (OSTI)

This report summarizes the Geothermal Injection Technology Program major activities in fiscal year 1986. The Idaho Engineering Laboratory (INEL) and the University of Utah Research Institute (UURI) have been conducting injection research and testing for this program, which was initiated in 1983. Activities at the INEL, representative element nodeling of fracture systems based on stochastic analysis, dual permeability modeling of flow in a fractured geothermal reservoir, and dual permeability model - laboratory and FRACSL-validation studies, are presented first, followed by the University of Utah Research Institute tracer development - experimental studies, which includes a brief description of activities planned for FY-1987.

Not Available

1987-07-01T23:59:59.000Z

107

Ecological Monitoring and Compliance Program Fiscal Year 2000 Report  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition ecoregion. Seventy bats, representing four bat species of concern, were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at selected tunnel and mine entrances verifying that some NTS mines and tunnels are used as bat roosts. Thirty-seven adult horses and 11 foals were counted this year. Four of the five foals observed last year have survived to yearlings. A monitoring plan for NTS horses was completed. Six active red-tailed hawk nests and 10 nestling red-tailed hawks were detected this year. Two spotlighting surveys for mule deer were conducted, each over three consecutive nights in October 1999 and August 2000. The mean sighting rate in October was 1.2 deer/10 kilometers (km) and 1.6 deer/10 km in August. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. Pahute Mesa Pond was confirmed to have vegetation,hydrology, and soil indicators that qualify the site as a jurisdictional wetland. The chemical spill test plan for one experiment at the HAZMAT Spill Center was reviewed for its potential to impact biota downwind of spills on Frenchman Lake playa.

Wills, C.A.

2000-12-01T23:59:59.000Z

108

Human factors in the management of Becon Construction Company's Heavy Oil Test Station Project. Final report  

Science Conference Proceedings (OSTI)

In January 1986, the Becon Construction Company - an open-shop contractor based in Houston, Texas - mobilized a work force to a construction project location at the Belridge Oil Field, near Bakersfield, California. The construction craftsmen and helpers in Becon's work force were expected to improve their level of productivity as the work proceeded because of the knowledge and skills that they would acquire as a result of the repetitive nature of the work. As it was originally organized, the Becon HOTS project represented almost a pure laboratory environment in which to collect data concerning the learning effect on worker productivity as well as to statistically isolate the impact on productivity of such external factors as weather, absenteeism, turnover, and especially work methods improvement techniques and pay incentives. From the outset of the HOTS project, the project manager had established an accurate system to quantitatively measure and compare the total manhours that each crew - civil, mechanical, electrical, and prefabrication -- performed at individual HOTS construction locations. Additionally, it was initially assumed that the project manager would be relatively free to implement changes to the job site conditions involving incentive pay and work methods improvement. The subsequent effect of these changes on the productivity of separate work crews could then be evaluated in terms of measured manhours per crew per HOTS.

Maurer, D.

1986-11-01T23:59:59.000Z

109

Greening of the White House: Six year report  

SciTech Connect

The White House, which recently celebrated its 200th birthday, has a long tradition of demonstrating technological innovation. In keeping with that tradition, President Clinton announced the Greening of the White House Initiative on Earth Day 1993. The initiative improves the energy and environmental performance of the White House complex by identifying opportunities to reduce waste, lower energy use, and make an appropriate use of renewable resources, all while improving indoor air quality and building comfort. This report on President Clinton's legacy of greening at the White House summarizes progress made to date and gives an overview of new opportunities identified during the past year. It also includes an environmental history of the White House and a short tour of the buildings that make up the White House complex. Over the past five years, this initiative has involved hundreds of dedicated people from both within and outside government. A description of how they worked together to develop and implement the Greening Plan is also included in this report.

None

1999-11-01T23:59:59.000Z

110

Weldon Spring Site Environmental Report for calendar year 1994  

SciTech Connect

This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels.

NONE

1995-05-01T23:59:59.000Z

111

Idaho Supplementation Studies : Five Year Report : 1992-1996.  

SciTech Connect

In 1991, the Idaho Supplementation Studies (ISS) project was implemented to address critical uncertainties associated with hatchery supplementation of chinook salmon Oncorhynchus tshawytscha populations in Idaho. The project was designed to address questions identified in the Supplementation Technical Work Group (STWG) Five-Year-Workplan (STWG 1988). Two goals of the project were identified: (1) assess the use of hatchery chinook salmon to increase natural populations in the Salmon and Clearwater river drainages, and (2) evaluate the genetic and ecological impacts of hatchery chinook salmon on naturally reproducing chinook salmon populations. Four objectives to achieve these goals were developed: (1) monitor and evaluate the effects of supplementation on presmolt and smolt numbers and spawning escapements of naturally produced fish; (2) monitor and evaluate changes in natural productivity and genetic composition of target and adjacent populations following supplementation; (3) determine which supplementation strategies (broodstock and release stage) provide the quickest and highest response in natural production without adverse effects on productivity; and (4) develop supplementation recommendations. This document reports on the first five years of the long-term portion of the ISS project. Small-scale studies addressing specific hypotheses of the mechanisms of supplementation effects (e.g., competition, dispersal, and behavior) have been completed. Baseline genetic data have also been collected. Because supplementation broodstock development was to occur during the first five years, little evaluation of supplementation is currently possible. Most supplementation adults did not start to return to study streams until 1997. The objectives of this report are to: (1) present baseline data on production and productivity indicators such as adult escapement, redd counts, parr densities, juvenile emigrant estimates, and juvenile survival to Lower Granite Dam (lower Snake River); (2) recommend changes in methodologies and tasks to improve data collection efficiency and utility.

Walters, Jody P.

1999-08-01T23:59:59.000Z

112

Sequim Site Radionuclide Air Emissions Report for Calendar Year 2012  

SciTech Connect

This report is prepared to document compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and ashington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. This report meets the calendar year 2012 Sequim Site annual reporting requirement for its operations as a privately-owned facility as well as its federally-contracted status that began in October 2012. Compliance is indicated by comparing the estimated dose to the maximally exposed individual (MEI) with the 10 mrem/yr Environmental Protection Agency (EPA) standard. The MSL contains only sources classified as fugitive emissions. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The dose to the Sequim Site MEI due to routine operations in 2012 was 9E-06 mrem (9E-08 mSv). No non-routine emissions occurred in 2012. The MSL is in compliance with the federal and state 10 mrem/yr standard.

Snyder, Sandra F.; Barnett, J. M.; Gervais, Todd L.

2013-04-01T23:59:59.000Z

113

AFBC (atmospheric fluidized-bed combustion) conversion at Northern States Power Company: Volume 1, Project origins: Final report  

SciTech Connect

This is the first volume in a series of four reports detailing the conversion of Northern States Power Company's (NSP) Black Dog unit 2 from pulverized-coal firing to atmospheric fluidized-bed combustion (AFBC). This particular report describes the important events and decisions that led to NSP's selection of its Black Dog unit 2 for conversion to AFBC, and it provides an overview of AFBC technology and a discussion of the AFBC conversion market. The purpose of these reports is to disseminate the information gathered during the Black Dog AFBC Conversion Project to utilities evaluating the technical feasibility and cost effectiveness of converting units within their systems from pulverized-coal firing to AFBC. To this end, each volume in this series of reports presents material about a different aspect of the Black Dog project. Volume 2 - Unit Design describes the design of the new AFBC system and the important decisions that led to its final configuration; Volume 3 - Unit Demolition describes the major activities that occurred during the demolition and relocation phase; and Volume 4 - Unit Construction describes the major activities that occurred during the construction phase of the project. 17 refs., 9 figs., 12 tabs.

deBrun Duffy, J.; Hinrichsen, D.

1987-11-01T23:59:59.000Z

114

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 1999  

Science Conference Proceedings (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 1999. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 199a). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 1999, these CY 1999 goals were extended to CY 2000 for all waste streams that generated waste in 1999. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 51 waste streams met or exceeded their reduction goal based on the CY 1999 data.

Bechtel Jacobs Company LLC

2000-03-01T23:59:59.000Z

115

The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 2000  

Science Conference Proceedings (OSTI)

This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 2000. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 2000). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 2000, these goals were extended to CY 2001 for all waste streams that generated waste in 2000. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 50 waste streams met or exceeded their reduction goal based on the CY 2000 data.

Bechtel Jacobs Company LLC

2001-03-01T23:59:59.000Z

116

Ford Motor Company  

E-Print Network (OSTI)

All statements, findings, and conclusions in this report are those of the authors and do not necessarily reflect those of the Global Interdependence Center, Ford Motor Company, or the Center for Automotive Research. TABLE OF CONTENTS Acknowledgements......................................................................................................................... iv

Ellen Hughes-cromwick; Joshua Cregger

2013-01-01T23:59:59.000Z

117

Brookhaven National Laboratory site environmental report for calendar year 1989  

Science Conference Proceedings (OSTI)

The environmental monitoring program is conducted by the Environmental Protection Section of the Safety and Environmental Protection (S EP) Division to determine whether operation of BNL facilities have met the applicable environmental standards and effluent control requirements. This program includes monitoring for both radiological and nonradiological parameters. This report summarizes the data for the external radiation levels; radioactivity in air, rain, potable water, surface water, ground water, soil, vegetation, and aquatic biota; water quality, metals, organics and petroleum products in ground water, surface water and potable water. Analytical results are reviewed by the S EP staff and when required by permit conditions are transmitted to the appropriate regulatory agencies. The data were evaluated using the appropriate environmental regulatory criteria. Detailed data for the calendar year 1989 are presented. 27 figs.

Miltenberger, R.P.; Royce, B.A.; Chalasani, S.S.; Morganelli, D.; Naidu, J.R.

1990-12-01T23:59:59.000Z

118

Knolls Atomic Power Laboratory environmental monitoring report, calendar year 1999  

SciTech Connect

The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the three KAPL Sites [Knolls Site, Niskayuna, New York; Kesselring Site, West Milton, New York; S1C Site, Windsor, Connecticut] during calendar year 1999 resulted in no significant release of hazardous substances or radioactivity to the environment. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations.

None

2000-12-01T23:59:59.000Z

119

SP-100 operational life model. Fiscal Year 1990 annual report  

DOE Green Energy (OSTI)

This report covers the initial year`s effort in the development of an Operational Life Model (OLM) for the SP-100 Space Reactor Power System. The initial step undertaken in developing the OLM was to review all available documentation from GE on their plans for the OLM and on the degradation and failure mechanisms envisioned for the SP-100. In addition, the DEGRA code developed at JPL, which modelled the degradation of the General Purpose Heat Source based Radioisotope Thermoelectric Generator (GPHS-RTG), was reviewed. Based on the review of the degradation and failure mechanisms, a list of the most pertinent degradation effects along with their key degradation mechanisms was compiled. This was done as a way of separating the mechanisms from the effects and allowing all of the effects to be incorporated into the OLM. The emphasis was on parameters which will tend to change performance as a function of time and not on those that are simply failures without any prior degradation.

Ewell, R.; Awaya, H.

1990-12-14T23:59:59.000Z

120

Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2000  

Science Conference Proceedings (OSTI)

The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls Site, Niskayuna, New York and the Kesselring Site, West Milton, New York and site closure activities at the S1C Site, Windsor, Connecticut, continued to have no adverse effect on human health and the quality of the environment during calendar year 2000. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations. Monitoring programs at the S1C Site were reduced in scope during calendar year 2000 due to completion of site dismantlement activities during 1999.

None

2001-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

SOLERAS - Solar Energy Water Desalination Project: Chicago Bridge and Iron Company. System design final report. Volume 1. Design report  

Science Conference Proceedings (OSTI)

Chicago Bridge and Iron Company (CBI), based on a demonstrated breakthrough in freeze desalination is proposing an indirect bulk freeze desalination process for seawater that is uniquely integrated with a stand alone solar cogeneration power plant. Working under SOLERAS auspices, CBI and Foster Miller Associates (FMA) have designed an integrated power system consisting of modular parabolic dish point focus solar energy collection, molten salt thermal energy storage, and a conventional steam turbine. The shaft power provides electrical energy needs via a generator and vapor compression energy needs via compressors. The vapor compression and turbine exhaust heat provide the refrigeration required for the unique freeze desalination process. Efficient energy utilization is achieved by using high grade heat to produce compression refrigeration. The flexibility of this system in making use of available energy and certain inherent advantages of the freeze desalination process make it very attractive. The desalination process includes seawater precooling and freezing, ice separation, washing, and melting to produce fresh water. Brine concentrate is rejected back to the sea after heat exchange with feed seawater.

Not Available

1986-01-01T23:59:59.000Z

122

Argonne National Laboratory site environmental report for calendar year 2007.  

SciTech Connect

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2007. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.; ESH /QA Oversight

2008-09-09T23:59:59.000Z

123

Argonne National Laboratory site enviromental report for calendar year 2008.  

Science Conference Proceedings (OSTI)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2008. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Davis, T. M.; Moos, L. P.

2009-09-02T23:59:59.000Z

124

Argonne National Laboratory site environmental report for calendar year 2004.  

SciTech Connect

This report discusses the accomplishments of the environmental protection program at Argonne National Laboratory (ANL) for calendar year 2004. The status of ANL environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of ANL operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the ANL site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and ANL effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, ANL, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; Kolzow, R. G.

2005-09-02T23:59:59.000Z

125

Argonne National Laboratory site environmental report for calendar year 2006.  

Science Conference Proceedings (OSTI)

This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2006. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

Golchert, N. W.; ESH /QA Oversight

2007-09-13T23:59:59.000Z

126

Pantex Plant site environmental report for calendar year 1989  

SciTech Connect

This report summarizes the environmental monitoring program at Pantex Plant for 1989. It has been prepared in accordance with the United States Department of Energy Order 5400.1. This report presents monitoring data for both radioactive and nonradioactive species in the local environment. Plant activities involve the handling of significant quantities of uranium, plutonium, and tritium in the form of completed parts received from other DOE facilities, resulting in a very low potential for release of these radionuclides to the atmosphere. In May 1989, there was an accidental release of 40,000 curies (Ci) of tritium (conservatively estimated). The normal releases during the year were 0.12 Ci of tritium and 21 {mu}Ci of uranium-238. The USEPA issued a draft Administrative Order of Consent under section 3008(h) in 1988. Negotiations between DOE and EPA are still continuing. Chromium at a level above drinking water standards was found in a perched groundwater well in zone 12. Also, trace amounts of solvents and high explosives were found in the perched groundwater in zone 12. 12 refs., 10 figs., 53 tabs.

Not Available

1990-05-01T23:59:59.000Z

127

Decontamination of metals by melt refining/slagging: First year progress report  

SciTech Connect

As the number of nuclear installations undergoing decontamination and decommissioning (D&D) increases, current radioactive waste storage space is consumed and establishment of new waste storage areas becomes increasingly difficult. The problem of handling and storing radioactive scrap metal (RSM) gains increasing importance in the DOE Environmental Restoration and Waste Management Program. To alleviate present and future waste storage problems, Westinghouse Idaho Nuclear Company (WINCO) is managing a program for the recycling of RSM for beneficial use within the DOE complex. As part of that effort, Montana Tech has been awarded a contract to help optimize melting and refining technologies for the recycling of stainless steel RSM. The scope of the Montana Tech program includes a literature survey, a decontaminating slag design study, small scale melting studies to determine optimum slag compositions for removal of radioactive contaminant surrogates, analysis of preferred melting techniques, and coordination of pilot scale melting demonstrations (100-500 lbs) to be conducted at selected commercial facilities. This program will identify methods that can be used to recycle stainless steel RSM which will be used to fabricate high and low level waste canisters for the Idaho Waste Immobilization Facility. This report summarizes the results of an extensive literature review and the first year`s progress on slag design, small-scale melt refining of surrogate-containing stainless steel (presently only a three month effort), and pilot-scale preparation of surrogate master ingots.

Mizia, R.E. [ed.; Worcester, S.A.; Twidwell, L.G.; Paolini, D.J.; Weldon, T.A.

1994-03-01T23:59:59.000Z

128

Hawaiian Electric Company Demand Response Roadmap Project Final...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hawaiian Electric Company Demand Response Roadmap Project Final Report Title Hawaiian Electric Company Demand Response Roadmap Project Final Report Publication Type Report LBNL...

129

StreamNet Project : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Fiscal Year 2008 (FY-08) represents a transitional year for the StreamNet project. While the project continued to acquire/update, standardize, georeference and disseminate fish-related data for the state, some tribal and one federal fisheries agencies, it also took on several new initiatives and is anticipating new regional guidance on data needs. Passage of the Columbia Basin Accords caused an administrative change within the project, separating the work done by the Columbia River Inter-Tribal Fish Commission (CRITFC) out to a separate contract with BPA. This will change the structure of the StreamNet contract but not change the relationship with the StreamNet Library or data developed by CRITFC, and will likely increase the availability of tribal data to StreamNet due to increased funding for tribal data efforts. This change will take effect in FY-09. We also expect that data work will be adjusted in the future in response to executive level policy direction in the Columbia Basin based on efforts to establish priorities under a regional data management framework. Data development emphasis was shifted this year to place highest priority on data that support indicators of fish abundance for the focal species covered in the Status of the Resource (SOTR) report, as requested by the Columbia Basin Fish and Wildlife Authority (CBFWA) Data Management Framework Subcommittee. We instituted an XML based web service allowing direct access to data from the project database for CBFWA to update the SOTR report. The project also increased efforts to work with tribal fisheries managers to provide data related assistance and to include tribal data in the StreamNet database. A primary theme this year was exploring means to speed the flow of data. We had ongoing success in our strategic emphasis on increasing automation of data conversion through development of comprehensive database systems within our partner agencies, as outlined in our Vision and Strategic Plan. By assisting development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project's primary means of disseminating fish data, was completely redesigned this year to improve

Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

2008-12-12T23:59:59.000Z

130

Annual Hanford Seismic Report for Fiscal Year 2010  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During FY 2010, the Hanford Seismic Network recorded 873 triggers on the seismometer system, which included 259 seismic events in the southeast Washington area and an additional 324 regional and teleseismic events. There were 210 events determined to be local earthquakes relevant to the Hanford Site. One hundred and fifty-five earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this fiscal year were a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al. 2009a, 2009b, 2009c, 2010a, 2010b, and 2010c). Most events were considered minor (coda-length magnitude [Mc] less than 1.0) with the largest event recorded on February 4, 2010 (3.0Mc). The estimated depths of the Wooded Island events are shallow (averaging approximately 1.5 km deep) placing the swarm within the Columbia River Basalt Group. Based upon the last two quarters (Q3 and Q4) data, activity at the Wooded Island area swarm has largely subsided. Pacific Northwest National Laboratory will continue to monitor for activity at this location. The highest-magnitude events (3.0Mc) were recorded on February 4, 2010 within the Wooded Island swarm (depth 2.4 km) and May 8, 2010 on or near the Saddle Mountain anticline (depth 3.0 km). This latter event is not considered unusual in that earthquakes have been previously recorded at this location, for example, in October 2006 (Rohay et al. 2007). With regard to the depth distribution, 173 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 18 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 19 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 178 earthquakes were located in known swarm areas, 4 earthquakes occurred on or near a geologic structure (Saddle Mountain anticline), and 28 earthquakes were classified as random events. The Hanford Strong Motion Accelerometer (SMA) network was triggered several times by the Wooded Island swarm events and the events located on or near the Saddle Mountain anticline. The maximum acceleration value recorded by the SMA network during fiscal year 2010 occurred February 4, 2010 (Wooded Island swarm event), approximately 2 times lower than the reportable action level for Hanford facilities (2% g) with no action required.

Rohay, Alan C.; Clayton, Ray E.; Sweeney, Mark D.; Devary, Joseph L.; Hartshorn, Donald C.

2010-12-27T23:59:59.000Z

131

Tampa Electric Company - DOE IGCC project. Quarterly report, July 1 - September 30, 1996  

SciTech Connect

The third quarter of 1996 has resulted in the completion of over five (5) years of extensive project development, design, construction and start-up of the 250 MW Polk Power Station Unit {number_sign}1 IGCC Project. the combined cycle performance test was completed on June 18, 1996. This test demonstrated that on distillate fuel, the combined cycle achieved a net output of 222,299 KW with a net heat rate of 6,868 BTU/KW. This is about 3.86% and 2.76% better than the guaranteed values of 214,040 KW and 7,063 BTU/KW respectively. During the third quarter of 1996, the combustion turbine was run on syngas two (2) different times for a combined total of about seven hours. Attachment {number_sign}4 shows graphically the transfer from oil to syngas. Emission levels were generally acceptable even though no specific emissions tuning was completed by GE and the emissions monitoring equipment was not yet completely operational.

1996-12-31T23:59:59.000Z

132

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

133

Health hazard evaluation report HETA 96-0137-2607, Yankee Atomic Electric Company, Rowe, Massachusetts  

SciTech Connect

In response to a request from the Health and Safety Supervisor at the Yankee Nuclear Power Station (SIC-4911), Rowe, Massachusetts, an investigation was begun into ozone (10028156) exposure during plasma arc cutting and welding. Welders had reported chest tightness, dry cough, and throat and bronchial irritation. The nuclear power station was in the process of being decommissioned, and workers were dismantling components using welding and cutting methods. Of the operations observed during the site visit, the highest ozone concentrations were generated during plasma arc cutting, followed by metal inert gas (MIG) welding and arc welding. During plasma arc cutting the average and peak concentrations exceeded the NIOSH ceiling recommended exposure limit of 0.1 part per million. The author concludes that ozone exposure during plasma arc cutting and MIG welding presented a health hazard to welders. The author recommends that improvements be made in the local exhaust ventilation, that nitrogen-dioxide levels be monitored during hot work, and that many exposed workers wear protective clothing, use ultraviolet blocking lotion, and continue the use appropriate shade of eye protection.

Sylvain, D.C.

1996-10-01T23:59:59.000Z

134

General Electric Company Hanford Works, Project C-431-A Production Facility-Section A, design report  

SciTech Connect

The 100-C project is to be located adjacent to the present 100-B Area. It is planned to build an addition to the present 181-B river pump house using the same elevations for pump settings, intakes, and floors as for the present pump house, thus maintaining the same suction conditions and flood protection as B Area. The 105 Building will be located on higher ground than B Area and therefore, protection against possible flood damage is assured. This report is divided into the following sections: (1) general description of project; (2) addition to existing river pump house; (3) raw water lines from 181-B addition to 183-C lead house; (4) the 183-C filter plant; (5) 190-C process pump house; (6) power house addition; (7) high tanks; (8) retention basins; (9) outside streamlines; (10) primary substation; (11) outside underground lines; (12) outside electric lines; (13) roads, railroads, walks, fences; (14) structural design of all buildings; and (15) architectural design of all buildings.

Colburn, R.T.

1951-03-29T23:59:59.000Z

135

Intrastate Natural Gas Companies  

E-Print Network (OSTI)

SUMMARY: In this Final Rule, the Commission eliminates the semi-annual storage reporting requirements for Interstate and Intrastate Natural Gas Companies. The Commission finds that these particular reporting requirements are largely duplicative with other reporting requirements. EFFECTIVE DATE: This rule will become effective [insert date 60 days from publication in Federal Register].

unknown authors

2012-01-01T23:59:59.000Z

136

Model year 2010 Ford Fusion Level-1 testing report.  

SciTech Connect

As a part of the US Department of Energy's Advanced Vehicle Testing Activity (AVTA), a model year 2010 Ford Fusion was procured by eTec (Phoenix, AZ) and sent to ANL's Advanced Powertrain Research Facility for the purposes of vehicle-level testing in support of the Advanced Vehicle Testing Activity. Data was acquired during testing using non-intrusive sensors, vehicle network information, and facilities equipment (emissions and dynamometer). Standard drive cycles, performance cycles, steady-state cycles, and A/C usage cycles were conducted. Much of this data is openly available for download in ANL's Downloadable Dynamometer Database. The major results are shown in this report. Given the benchmark nature of this assessment, the majority of the testing was done over standard regulatory cycles and sought to obtain a general overview of how the vehicle performs. These cycles include the US FTP cycle (Urban) and Highway Fuel Economy Test cycle as well as the US06, a more aggressive supplemental regulatory cycle. Data collection for this testing was kept at a fairly high level and includes emissions and fuel measurements from an exhaust emissions bench, high-voltage and accessory current/voltage from a DC power analyzer, and CAN bus data such as engine speed, engine load, and electric machine operation. The following sections will seek to explain some of the basic operating characteristics of the MY2010 Fusion and provide insight into unique features of its operation and design.

Rask, E.; Bocci, D.; Duoba, M.; Lohse-Busch, H.; Energy Systems

2010-11-23T23:59:59.000Z

137

Model year 2010 Honda insight level-1 testing report.  

DOE Green Energy (OSTI)

As a part of the US Department of Energy's Advanced Vehicle Testing Activity (AVTA), a model year 2010 Honda Insight was procured by eTec (Phoenix, AZ) and sent to ANL's Advanced Powertrain Research Facility for the purposes of vehicle-level testing in support of the Advanced Vehicle Testing Activity (AVTA). Data was acquired during testing using non-intrusive sensors, vehicle network information, and facilities equipment (emissions and dynamometer data). Standard drive cycles, performance cycles, steady-state cycles and A/C usage cycles were tested. Much of this data is openly available for download in ANL's Downloadable Dynamometer Database (D3). The major results are shown here in this report. Given the preliminary nature of this assessment, the majority of the testing was done over standard regulatory cycles and seeks to obtain a general overview of how the vehicle performs. These cycles include the US FTP cycle (Urban) and Highway Fuel Economy Test cycle as well as the US06, a more aggressive supplemental regulatory cycle. Data collection for this testing was kept at a fairly high level and includes emissions and fuel measurements from an exhaust emissions bench, high-voltage and accessory current and voltage from a DC power analyzer, and CAN bus data such as engine speed, engine load, and electric machine operation when available. The following sections will seek to explain some of the basic operating characteristics of the MY2010 Insight and provide insight into unique features of its operation and design.

Rask, E.; Bocci, D.; Duoba, M.; Lohse-Busch, H. (Energy Systems)

2011-03-22T23:59:59.000Z

138

Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2001  

Science Conference Proceedings (OSTI)

The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls and Kesselring Sites and Site closure activities at the S1C Site (also known as the KAPL Windsor Site) continue to have no adverse effect on human health and the quality of the environment. The effluent and environmental monitoring programs conducted by KAPL at the Knolls and Kesselring Sites are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as environmental monitoring of air, water, sediment, and fish. Radiation measurements are also made around the perimeter of the Knolls and Kesselring Sites and at off-site background locations. The environmental monitoring program for the S1C Site continues to be reduced in scope from previous years due to the completion of Site dismantlement activities during 1999 and a return to green field conditions during 2000.

NONE

2002-12-31T23:59:59.000Z

139

Strategic Petroleum Reserve annual report for calendar year 1998  

SciTech Connect

The Strategic Petroleum Reserve was established in 1975 as an emergency response to the 1973 Arab oil embargo. It is authorized by the Energy Policy and Conservation Act (EPCA), and by the comprehensive energy plans of all Administrations since 1975, in recognition of the long-term dependence of the US on imported crude oil and petroleum products. Section 165 of EPCA requires the Secretary of Energy to submit an Annual Report to the President and the Congress. On May 13, 1998, the Department published a Statement of Administration Policy which reaffirmed its commitment to maintain a Government-owned and controlled, centrally located Strategic Petroleum Reserve of crude oil. The Reserve is to be used solely for responding to the types of severe oil supply interruptions presently contemplated in EPCA. Over the past twenty years, the Reserve has grown as large as 592 million barrels--a peak reached in 1994. From 1994 to 1996, nearly 28 million barrels were sold to raise revenues for the U S Treasury. As of December 31, 1998, the crude oil inventory was 561,108,127 barrels which equated to 60 days of net oil imports during 1998. The US now relies on a combination of both the Reserve and private stocks to meet its oil storage obligations to the International Energy Agency.

1998-12-31T23:59:59.000Z

140

Technical Standards, Fiscal Year 2007 Agency Report - February...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

research, energy efficency, oil storage, hydroelectric power, accelerator operations, nuclear facility decommissioning, and fusion experiments. Technical Standards, Fiscal Year...

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Third Quarter Hanford Seismic Report for Fiscal Year 2010  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 23 local earthquakes during the third quarter of FY 2010. Sixteen earthquakes were located at shallow depths (less than 4 km), five earthquakes at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments, and two earthquakes were located at depths greater than 9 km, within the basement. Geographically, twelve earthquakes were located in known swarm areas, 3 earthquakes occurred near a geologic structure (Saddle Mountain anticline), and eight earthquakes were classified as random events. The highest magnitude event (3.0 Mc) was recorded on May 8, 2010 at depth 3.0 km with epicenter located near the Saddle Mountain anticline. Later in the quarter (May 24 and June 28) two additional earthquakes were also recorded nearly at the same location. These events are not considered unusual in that earthquakes have been previously recorded at this location, for example, in October 2006 (Rohay et al; 2007). Six earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter were a continuation of the swarm events observed during the 2009 and 2010 fiscal years and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, 2010a, and 2010b). All events were considered minor (coda-length magnitude [Mc] less than 1.0) with a maximum depth estimated at 1.7 km. Based upon this quarters activity it is likely that the Wooded Island swarm has subsided. Pacific Northwest National Laboratory (PNNL) will continue to monitor for activity at this location.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2010-09-29T23:59:59.000Z

142

Annual Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During fiscal year 2008, the Hanford Seismic Network recorded 1431 triggers on the seismometer system, which included 112 seismic events in the southeast Washington area and an additional 422 regional and teleseismic events. There were 74 events determined to be local earthquakes relevant to the Hanford Site. The highest-magnitude event (3.7 Mc) occurred on May 18, 2008, and was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, 13 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 45 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 16 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 54 earthquakes were located in swarm areas and 20 earthquakes were classified as random events. The May 18 earthquake was the highest magnitude event recorded since 1975 in the vicinity of the Hanford Site (between 46 degrees and 47 degrees north latitude and 119 degrees and 120 degrees west longitude). The event was not reported as being felt on the Hanford Site or causing any damage and was communicated to the Pacific Northwest National Laboratory Operations Center per HSAP communi¬cations procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and 400 Area were triggered by the May 18 event. The maximum acceleration recorded at the SMA stations (0.17% at the 300 Area) was 12 times smaller than the reportable action level (2% g) for Hanford Site facilities.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-12-29T23:59:59.000Z

143

Kootenay Lake Fertilization Experiment, Year 15 (North Arm) and Year 3 (South Arm) (2006) Report  

DOE Green Energy (OSTI)

This report summarizes results from the fifteenth year (2006) of nutrient additions to the North Arm of Kootenay Lake and three years of nutrient additions to the South Arm. Experimental fertilization of the lake has been conducted using an adaptive management approach in an effort to restore lake productivity lost as a result of nutrient uptake in upstream reservoirs. The primary objective of the experiment is to restore kokanee (Oncorhynchus nerka) populations, which are the main food source for Gerrard rainbow trout (Oncorhynchus mykiss) and bull trout (Salvelinus confluentus). The quantity of agricultural grade liquid fertilizer (10-34-0, ammonium polyphosphate and 28-0-0, urea ammonium nitrate) added to the North Arm in 2006 was 44.7 tonnes of P and 248.4 tonnes of N. The total fertilizer load added to the South Arm was 257 tonnes of nitrogen; no P was added. Kootenay Lake has an area of 395 km{sup 2}, a maximum depth of 150 m, a mean depth of 94 m, and a water renewal time of approximately two years. Kootenay Lake is a monomictic lake, generally mixing from late fall to early spring and stratifying during the summer. Surface water temperatures generally exceed 20 C for only a few weeks in July. Results of oxygen profiles were similar to previous years with the lake being well oxygenated from the surface to the bottom depths at all stations. Similar to past years, Secchi disc measurements at all stations in 2006 indicate a typical seasonal pattern of decreasing depths associated with the spring phytoplankton bloom, followed by increasing depths as the bloom gradually decreases by the late summer and fall. Total phosphorus (TP) ranged from 2-7 {micro}g/L and tended to decrease as summer advanced. Over the sampling season dissolved inorganic nitrogen (DIN) concentrations decreased, with the decline corresponding to nitrate (the dominant component of DIN) being utilized by phytoplankton during summer stratification. Owing to the importance of epilimnetic nitrate that is required for optimal phytoplankton growth discrete depth water sampling occurred in 2006 to measure more accurately changes in the nitrate concentrations. As expected there was a seasonal decline in nitrate concentrations, thus supporting the strategy of increasing the nitrogen loading in both arms. These in-season changes emphasize the need for an adaptive management approach to ensure the nitrogen to phosphorus (N:P) ratio does not decrease below 15:1 (weight:weight) during the fertilizer application period. Phytoplankton composition determined from the integrated samples (0-20m) was dominated by diatoms, followed by cryptophytes and chrysophytes. The contribution of cryptophytes to total biomass was higher in 2006 than in 2005. Cryptophytes, considered being edible biomass for zooplankton and Daphnia spp., increased in 2006. Phytoplankton in the discrete depth samples (2, 5, 10, 15 and 20m) demonstrated a clear north to south gradient in average phytoplankton density and biomass among the three stations sampled, with highest values at the North Arm station (KLF 2) and lowest values in the most southern station in the South Arm (KLF 7). Populations were dominated by flagellates at all stations and depths in June and July, then dominated by diatoms in August and September in the North and South arms of the lake. There were no large bluegreen (cyanobacteria) populations in either arm of the lake in 2006. Seasonal average zooplankton abundance and biomass in both the main body of the lake and in the West Arm increased in 2006 compared to 2005. Zooplankton density was numerically dominated by copepods and biomass was dominated by Daphnia spp. The annual average mysid biomass data at deep stations indicated that the North Arm of Kootenay Lake was more productive than the South Arm in 2006. Mysid densities increased through the summer and declined in the winter; mean whole lake values remain within prefertilization densities. Kokanee escapement to Meadow Creek declined in 2006 to approximately 400,000 spawners. The Lardeau River escapement also declined wit

Schindler, E.U.; Sebastian, D.; Andrusak, G.F. [Fish and Wildlife Science and Allocation, Ministry of Environment, Province of British Columbia

2009-07-01T23:59:59.000Z

144

Model year 2010 Honda insight level-1 testing report.  

SciTech Connect

As a part of the US Department of Energy's Advanced Vehicle Testing Activity (AVTA), a model year 2010 Honda Insight was procured by eTec (Phoenix, AZ) and sent to ANL's Advanced Powertrain Research Facility for the purposes of vehicle-level testing in support of the Advanced Vehicle Testing Activity (AVTA). Data was acquired during testing using non-intrusive sensors, vehicle network information, and facilities equipment (emissions and dynamometer data). Standard drive cycles, performance cycles, steady-state cycles and A/C usage cycles were tested. Much of this data is openly available for download in ANL's Downloadable Dynamometer Database (D3). The major results are shown here in this report. Given the preliminary nature of this assessment, the majority of the testing was done over standard regulatory cycles and seeks to obtain a general overview of how the vehicle performs. These cycles include the US FTP cycle (Urban) and Highway Fuel Economy Test cycle as well as the US06, a more aggressive supplemental regulatory cycle. Data collection for this testing was kept at a fairly high level and includes emissions and fuel measurements from an exhaust emissions bench, high-voltage and accessory current and voltage from a DC power analyzer, and CAN bus data such as engine speed, engine load, and electric machine operation when available. The following sections will seek to explain some of the basic operating characteristics of the MY2010 Insight and provide insight into unique features of its operation and design.

Rask, E.; Bocci, D.; Duoba, M.; Lohse-Busch, H. (Energy Systems)

2011-03-22T23:59:59.000Z

145

Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power  

SciTech Connect

This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

Rutherford, P.D. [ed.] [ed.

1999-09-22T23:59:59.000Z

146

Final report - Sundyne Company  

DOE Green Energy (OSTI)

Solar cookers offer a viable alternative to conventional cooking methods in many areas, and can be an effective tool in the fight against the deforestation and desertification that plague many developing countries. However, there have been numerous obstacles to the successful dissemination of solar cookers in the past. The purpose of this paper is to identify opportunities, review constraints and develop a marketing strategy to disseminate the Sundyne Solar Cooker (SSC) in developing countries.

Long, J.B.

1994-09-27T23:59:59.000Z

147

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

NONE

1995-11-01T23:59:59.000Z

148

Laboratory directed research and development. Annual report, fiscal year 1995  

SciTech Connect

This document is a compilation of the several research and development programs having been performed at the Pacific Northwest National Laboratory for the fiscal year 1995.

1996-02-01T23:59:59.000Z

149

2008 Wind Technologies Market Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Service Company. Flagstaff, Arizona: Northern Arizona University. American Wind Energy Association (AWEA). 2009a. Annual Wind Industry Report: Year Ending 2008. Washington,...

150

CEMENTITIOUS BARRIERS PARTNERSHIP FY2013 END-YEAR REPORT  

SciTech Connect

In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long?term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOE applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non?fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. Two CBP software demonstrations were conducted in FY2013, one to support the Saltstone Disposal Facility (SDF) at SRS and the other on a representative Hanford high?level waste tank. The CBP Toolbox demonstration on the SDF provided analysis on the most probable degradation mechanisms to the cementitious vault enclosure caused by sulfate and carbonation ingress. This analysis was documented and resulted in the issuance of a SDF Performance Assessment Special Analysis by Liquid Waste Operations this fiscal year. The two new software tools supporting chloride attack and dual?regime flow will provide additional degradation tools to better evaluate performance of DOE and commercial cementitious barriers. The CBP SRNL experimental program produced two patent applications and field data that will be used in the development and calibration of CBP software tools being developed in FY2014. The CBP software and simulation tools varies from other efforts in that all the tools are based upon specific and relevant experimental research of cementitious materials utilized in DOE applications. The CBP FY2013 program involved continuing research to improve and enhance the simulation tools as well as developing new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools through laboratory experiments and analysis of field specimens are ongoing and will continue into FY2014 to quantify and reduce the uncertainty associated with performance assessments. This end?year report summarizes FY2013 software development efforts and the various experimental programs that are providing data for calibration and validation of the CBP developed software.

Flach, G.; Langton, C.; Burns, H.; Smith, F.; Kosson, D.; Brown, K.; Samson, E.; Meeussen, J.; van der Sloot, H.; Garboczi, E.

2013-11-01T23:59:59.000Z

151

Third Quater Seismic Report for Fiscal Year 2007  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, 16 local earthquakes were recorded during the third quarter of fiscal year 2007. The largest event (magnitude 2.0) occurred on April 16, 2007 and was located 4 km southwest of the 400 Area in the Columbia River basalts at a depth of approximately 3 km. Stratigraphically, 7 earthquakes occurred in the Columbia River basalts (approximately 0-5 km depth), 1 earthquake in the pre-basalt sediments (approximately 5-10 km depth), and 8 earthquakes in the crystalline basement (approximately 10-25 km depth). Geographically, 8 earthquakes occurred in swarm areas, and 8 earthquakes were classified as random events. The Hanford SMA network was triggered on the 300 Area and the 400 Area SMA by the 2.0 Mc seismic event that occurred on April 16, 2007. The maximum vertical acceleration was 0.07 % g and the maximum horizontal acceleration was 0.05% g at the 300 Area SMA, 13.5 km from the event. At the 400 Area SMA, only 5.2 km from the event, the maximum vertical acceleration was 0.25 % g and the maximum horizontal acceleration was 0.23% g. These are the first recordings of a small local earthquake on the SMA network. The reportable action level of 2% g for Hanford facilities is approximately 8 times larger than the peak accelerations observed at the 400 Area and no action was required.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2007-09-19T23:59:59.000Z

152

Hanford Site Environmental Report for Calendar Year 2002  

SciTech Connect

This report is prepared annually to satisfy the requirements of DOE Orders. The report provides an overview of activities at the Hanford Site during 2002 and demonstrates the site's compliance with applicable federal, state, and local environmental laws, regulations, executive orders, and DOE policies; and to summarize environmental data that characterize Hanford Site environmental management performance. The purpose of the report is to provide useful summary information to members of the public, public officials, regulators, Hanford contractors, and elected representatives.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2003-09-01T23:59:59.000Z

153

Sandia National Laboratories Procurement Organization annual report, fiscal year 1994  

Science Conference Proceedings (OSTI)

This report summarizes the purchasing and transportation activities of the Procurement Organization for FY 1994. Activities for both the New Mexico and California locations are included.

Stimak, D.R.

1995-03-01T23:59:59.000Z

154

Sound Oil Company  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sound Oil Company Sound Oil Company file:///C|/Documents%20and%20Settings/blackard/Desktop/EIA/LEE0152.HTM[11/29/2012 2:30:44 PM] DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Application for Exception Name of Petitioner: Sound Oil Company Date of Filing: August 16, 1994 Case Number: LEE-0152 On August 16, 1994, Sound Oil Company (Sound) of Seattle Washington, filed an Application for Exception with the Office of Hearings and Appeals of the Department of Energy. In its Application, Sound requests that it be relieved of the requirement that it file the Energy Information Administration's (EIA) form entitled "Resellers'/Retailers' Monthly Petroleum Product Sales Report" (Form EIA-782B). As explained below, we have determined that the Application for Exception should be denied.

155

Photon Sciences Directorate | 2010 Annual Report | Year In Review  

NLE Websites -- All DOE Office Websites (Extended Search)

Year In Review The NSLS-II construction site transformed from a field of dirt to a fully formed steel ring half a mile in circumference, a new education program introduced a...

156

Occupational Health and Safety Database 2012: Annual Data Reporting Years, 1995-2011  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute’s Occupational Health and Safety Database (OHSD) provides the capability for monitoring annual injury/illness trends, benchmarking, evaluating intervention programs, and identifying research targets for health and safety research in the electric power sector.Results and FindingsThe OHSD integrates 17-years (1995-2011) of personnel, injury, and medical claims data from 18 companies into a single data system. This ...

2013-07-30T23:59:59.000Z

157

Hanford Site Environmental Report for Calendar Year 2008  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

158

Hanford Site Environmental Report for Calendar Year 2007  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2008-06-05T23:59:59.000Z

159

Hanford Site Environmental Report for Calendar Year 2009  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2010-09-01T23:59:59.000Z

160

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.``

NONE

1994-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Research and Development Report, Fiscial Year 1989-1990.  

DOE Green Energy (OSTI)

Since the 1940s, the Bonneville Power Administrative (BPA), has sought to advance an efficient system to provide the Pacific Northwest region with safe, reliable, and cost-effective electrical power. Research and development (R D) activities support that mission. Each biennium, R D managers issue a digest report of the various programs and activities in each of the technological arenas. The report covers a few projects, considered as yielding particularly significant results, as spotlights. Others are described less fully; in some cases with a simple annotation. The report's divisions correspond to the major categories of R D projects: fish and wildlife, energy resources, and transmission technology. 18 figs., 4 tabs.

United States. Bonneville Power Administration.

1991-08-01T23:59:59.000Z

162

Annual site environmental report for calendar year 1989  

DOE Green Energy (OSTI)

The Western Area Power Administration has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved within 1989 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in fifteen states, this report was written to address the environmental activities in all of the facilities as one ``site.``

NONE

1996-03-01T23:59:59.000Z

163

Hanford Site Environmental Report for Calendar Year 2010  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2011 information is included where appropriate.

Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

2011-07-12T23:59:59.000Z

164

Test and evaluation report for Westinghouse Hanford Company`s 1-L Liquid Shipper, Docket 95-41-7A, Type A container  

Science Conference Proceedings (OSTI)

This report documents the U.S. Department of Transportation Specification 7A Type A (DOT-7A) compliance test results of the 1-L Liquid Shipper packaging. The 1-L Liquid Shipper consists of the 3M SafeSend polyethylene canister base and cap with integral sorbent material, a quad ring gasket, a plastic bag, and six foam inserts. A 1-L narrow-mouth, Teflon bottle with Tefzel lid holds contents. The inner bottle is placed inside the SafeSend container. The inner bottle content weight cannot exceed 2000 g (4.4 lb). Total bottle weight, including contents cannot exceed 2167.5 g (4.78 lb). The nominal gross weight of the assembled packaging is to be no more that 3830.5 g (8.4 lb). The approved packaging system is designed to ship Type A quantities of radioactive materials, normal form. Contents may be liquid or solid form. Liquid contents may have a specific gravity less than or equal to (packaging, to the gross weight of the as-tested liquids and bottles.

Kelly, D.L.

1995-11-01T23:59:59.000Z

165

Hanford Site Environmental Report for Calendar Year 2000  

Science Conference Proceedings (OSTI)

This Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2001-09-25T23:59:59.000Z

166

Hanford Site Environmental Report for Calendar Year 1999  

Science Conference Proceedings (OSTI)

The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

2000-09-28T23:59:59.000Z

167

Annual Site Environmental Report for Calendar Year 2004  

SciTech Connect

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2004 environmental surveillance and monitoring program for PPPL's are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2004.

V. Finley

2009-03-26T23:59:59.000Z

168

Hanford Site environmental report for calendar year 1996  

SciTech Connect

The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology.

Dirkes, R.L.; Hanf, R.W. [eds.] [eds.

1997-08-01T23:59:59.000Z

169

Annual site environmental report for calendar year 1986  

DOE Green Energy (OSTI)

The Western Area Power Administration has established an effective formal environmental protection, auditing, and monitoring program which has been in effect since 1978. This annual site environmental report discusses the significant environmental projects and issues Western was involved with in 1986, and it is written to demonstrate the nature and effectiveness of the environmental protection program. Western has numerous facilities located in 15 states. This report was written to address all the facilities.

NONE

1987-05-01T23:59:59.000Z

170

Recent market activities of major interstate pipeline companies  

Science Conference Proceedings (OSTI)

In addition to analyzing trends in wellhead purchases over the past year, this study also presents information and analysis of natural gas purchases from other pipeline companies, and sales to several types of customers. Activities of 20 major interstate pipeline companies were analysed in response to market developments over the past 4 years and over the past year in particular. This study includes an analysis of trends in natural gas sales and of the effects of increasing prices since 1979. It includes separate analyses of direct industrial sales, sales to major pipeline companies, and other sales for resale, as well as analyses of the volumes transported for sale to others. It also reports on purchase patterns in general since 1979 and on purchase projection patterns for particular types of gas since 1981. The differing behavior of pipeline companies in purchasing high-cost gas in the current market is also analyzed. (PSB)

Not Available

1984-01-01T23:59:59.000Z

171

CATALYSTS NHI Thermochemical Systems FY 2009 Year-End Report  

DOE Green Energy (OSTI)

Fiscal Year 2009 work in the Catalysts project focused on advanced catalysts for the decomposition of sulfuric acid, a reaction common to both the Sulfur-Iodine (S-I) cycle and the Hybrid Sulfur cycle. Prior years’ effort in this project has found that although platinum supported on titanium oxide will be an acceptable catalyst for sulfuric acid decomposition in the integrated laboratory scale (ILS) project, the material has short comings, including significant cost and high deactivation rates due to sintering and platinum evaporation. For pilot and larger scale systems, the catalyst stability needs to be improved significantly. In Fiscal Year 2008 it was found that at atmospheric pressure, deactivation rates of a 1 wt% platinum catalyst could be reduced by 300% by adding either 0.3 wt% iridium (Ir) or 0.3 wt% ruthenium (Ru) to the catalyst. In Fiscal Year 2009, work focused on examining the platinum group metal catalysts activity and stability at elevated pressures. In addition, simple and complex metal oxides are known to catalyze the sulfuric acid decomposition reaction. These metal oxides could offer activities comparable to platinum but at significantly reduced cost. Thus a second focus for Fiscal Year 2009 was to explore metal oxide catalysts for the sulfuric acid decomposition reaction. In Fiscal Year 2007 several commercial activated carbons had been identified for the HI decomposition reaction; a reaction specific to the S-I cycle. Those materials should be acceptable for the pilot scale project. The activated carbon catalysts have some disadvantages including low activity at the lower range of reactor operating temperature (350 to 400°C) and a propensity to generate carbon monoxide in the presence of water that could contaminate the hydrogen product, but due to limited funding, this area had low priority in Fiscal Year 2009. Fiscal Year 2009 catalyst work included five tasks: development, and testing of stabilized platinum based H2SO4 catalysts, development and testing of metal oxide based H2SO4 catalysts, support of the ILS for catalyst studies, conducting a long term catalyst stability test at anticipated operating temperatures and pressures, and developing capabilities for conducting pressurized catalyst tests.

Daniel M. Ginosar

2009-09-01T23:59:59.000Z

172

Report on Competitive Sourcing Results Fiscal Year 2005  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 April 2006 Executive Office of the President Office of Management and Budget Table of Contents Executive Summary ...................................................................................................1 Introduction ................................................................................................................3 Part I. FY 2005 activities and three-year trends .......................................................3 A. Use of competition............................................................................................3 1. Level of competition ......................................................................................3 2. Activities competed........................................................................................9

173

Annual site environmental report for calendar year 1997  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. Because Western has over 400 facilities located in 15 states, this report addresses the environmental activities in all the facilities as one site. In March, 1996, Western established a team representing each of the four Regional Offices, the CRSP Customer Service Center and the Corporate Service Office to develop an Environmental Management System based on the guidelines in ISO 14001. The significant environmental projects and issues Western was involved with in 1997 are discussed in this annual site environmental report. This report is written to show the nature and effectiveness of the environmental protection program.

NONE

1997-12-31T23:59:59.000Z

174

Laboratory Directed Research and Development annual report, fiscal year 1997  

SciTech Connect

The Department of Energy Order 413.2(a) establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 413.2, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. DOE Order 413.2 requires that each laboratory submit an annual report on its LDRD activities to the cognizant Secretarial Officer through the appropriate Operations Office Manager. The report provided in this document represents Pacific Northwest National Laboratory`s LDRD report for FY 1997.

NONE

1998-03-01T23:59:59.000Z

175

U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site  

Science Conference Proceedings (OSTI)

During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

NONE

1995-08-03T23:59:59.000Z

176

Pinellas Plant annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

Not Available

1994-06-10T23:59:59.000Z

177

Annual Site Environmental Report for Calendar Years 2005-2006  

SciTech Connect

Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratory's Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on-site and is certified for analyzing radiological and non-radiological parameters through the New Jersey Department of Environmental Protection's Laboratory Certification Program, Certification Number 12471. Non-radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories - QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the "Annual Site Environmental Report for 2005 and 2006," are documented and certified to be correct.

Virginia L. Finley

2010-01-25T23:59:59.000Z

178

Hanford Site environmental report for calendar year 1995  

SciTech Connect

The Hanford Site Environmental Report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. It also highlights environmental programs and efforts. It is written to meet reporting requirements and guidelines of DOE and to meet the needs of the public. Individual sections are designed to describe the Hanford Site and its mission, summarize the status in 1995 of compliance, describe the environmental programs, discuss estimated radionuclide exposure to the public from 1995 Hanford activities, present information on effluent monitoring and environmental surveillance (including ground- water protection and monitoring), and discuss activities to ensure quality.

Dirkes, R.L.; Hanf, R.W. [eds.] [Pacific Northwest National Lab., Richland, WA (United States)] [eds.; Pacific Northwest National Lab., Richland, WA (United States)

1996-06-01T23:59:59.000Z

179

Hanford Site environmental report for calendar year 1991  

Science Conference Proceedings (OSTI)

This report of the Hanford Reservation is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. The report also highlights major environmental programs and efforts. The following sections: describe the Hanford Site and its mission; summarize the status in 1991 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; present information on environmental surveillance and the ground-water protection and monitoring program; and discuss activities to ensure quality.

Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. (eds.)

1992-06-01T23:59:59.000Z

180

Brookhaven National Laboratory site environmental report for calendar year 1996  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1996. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and non-radiological emissions and effluents to the environment.

Schroeder, G.L.; Paquette, D.E.; Naidu, J.R.; Lee, R.J.; Briggs, S.L.K.

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Hanford Site environmental report for calendar year 1989  

Science Conference Proceedings (OSTI)

This report is a summary of the environmental status of the Hanford Site in 1989. It includes descriptions of the Site and its mission, the status of compliance with environmental regulations, planning and activities to accomplish compliance, environmental protection and restoration activities, and environmental monitoring. 97 refs., 67 figs., 14 tabs.

Jaquish, R.E.; Bryce, R.W. (eds.)

1990-05-01T23:59:59.000Z

182

Brookhaven National Laboratory site environmental report for calendar year 1995  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

1996-12-01T23:59:59.000Z

183

FEMP Fiscal Year 1999 ESPC Business Strategy Development Summary Report  

SciTech Connect

This report summarizes the objectives, activities, products, and recommendations of the ESPC Business Strategy Development project. The objective of this project was to assist DOE FEMP in defining the potential Federal sector market for FEMP-offered alternative financing services with a focus on Super-Energy Savings Performance Contracts (Super-ESPCs).

McMordie-Stoughton, Katherine L.; Hunt, W. D.

2000-03-03T23:59:59.000Z

184

Solar parabolic dish annual technology evaluation report. Fiscal year 1982  

DOE Green Energy (OSTI)

This report summarizes the activities of the JPL Solar Thermal Power Systems Parabolic Dish Project for FY 1982. Included are discussions on designs of module development including their concentrator, receiver, and power conversion subsystems. Analyses and test results, along with progress on field tests, Small Community Experiment System development, and tests at the Parabolic Dish Test Site are also included.

Not Available

1983-09-15T23:59:59.000Z

185

Annual site environmental report for calendar year 1996  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program. Western markets power from 56 hydroelectric power generating plants in its service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The significant environmental projects and issues Western was involved with in 1996 are discussed in this report.

NONE

1996-12-31T23:59:59.000Z

186

Laboratory directed research and development annual report. Fiscal year 1994  

SciTech Connect

The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. This report represents Pacific Northwest Laboratory`s (PNL`s) LDRD report for FY 1994. During FY 1994, 161 LDRD projects were selected for support through PNL`s LDRD project selection process. Total funding allocated to these projects was $13.7 million. Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our {open_quotes}core competencies.{close_quotes} Currently, PNL`s core competencies have been identified as integrated environmental research; process science and engineering; energy systems development. In this report, the individual summaries of LDRD projects (presented in Section 1.0) are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. Projects within the three core competency areas were approximately 91.4 % of total LDRD project funding at PNL in FY 1994. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. Funding allocated to each of these projects is typically $35K or less. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL`s LDRD program, the management process used for the program, and project summaries for each LDRD project.

NONE

1995-02-01T23:59:59.000Z

187

Global temperature patterns 6000 years ago. Progress report  

Science Conference Proceedings (OSTI)

The overall goal is to illustrate the climatic patterns of 5000 to 7000 years ago over as wide an area of the northern hemisphere as possible. Mapping of the patterns in selected climatic variables at 5000 to 7000 years ago that can be reconstructed from pollen and marine-plankton data is planned. Multivariate statistical methods permit using the modern distribution of these data in order to transform their fossil remains into climate estimates of past times. Given these goals and methods, research during the first eight months focused on assembling the available modern and fossil data from each of the main areas under study. Two workshop conferences were held to help organize the joint work.

Webb, T. III

1980-01-01T23:59:59.000Z

188

Annual Report for the Year 2003-2004  

E-Print Network (OSTI)

for the records, the Particle Physics and Astronomy Research Council (PPARC), for the deposit to become permanent. There are close connections between the RGO Archives and other collections in the University Library, particularly with material in the Portsmouth... part of the closed stacks could not be fetched for readers because the pneumatic stacks were out of action. These stacks have been in constant use for over thirty years and are subject to frequent breakdown. When this happens it can take several weeks...

Cambridge University Library

2004-01-01T23:59:59.000Z

189

Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report  

SciTech Connect

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

Wellman, Dawn M.; Johnson, Timothy C.; Smith, Ronald M.; Truex, Michael J.; Matthews, Hope E.

2011-10-01T23:59:59.000Z

190

Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report  

SciTech Connect

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

Wellman, Dawn M.; Johnson, Timothy C.; Smith, Ronald M.; Truex, Michael J.; Matthews, Hope E.

2011-10-01T23:59:59.000Z

191

Brookhaven National Laboratory technology transfer report, fiscal year 1986  

SciTech Connect

An increase in the activities of the Office of Research and Technology Applications (ORTA) is reported. Most of the additional effort has been directed to the regional electric utility initiative, but intensive efforts have been applied to the commercialization of a compact synchrotron storage ring for x-ray lithography applications. At least six laboratory technologies are reported as having been transferred or being in the process of transfer. Laboratory accelerator technology is being applied to study radiation effects, and reactor technology is being applied for designing space reactors. Technologies being transferred and emerging technologies are described. The role of the ORTA and the technology transfer process are briefly described, and application assessment records are given for a number of technologies. A mini-incubator facility is also described. (LEW)

Not Available

1986-01-01T23:59:59.000Z

192

Mound site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

The purpose of this report is to inform the public about the impact of Mound operations on the population and the environment. Mound is a government-owned facility operated by EG&G Mound Applied Technologies for the US Department of Energy (DOE). This integrated production, development, and research site performs work in support of DOE`s weapon and energy related programs, with emphasis on explosive, nuclear and energy technologies.

Bauer, L.R.

1993-07-01T23:59:59.000Z

193

Brookhaven National Laboratory site environmental report for calendar year 1994  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory.

Naidu, J.R.; Royce, B.A. [eds.

1995-05-01T23:59:59.000Z

194

Solar parabolic dish technology annual evaluation report. Fiscal year 1983  

DOE Green Energy (OSTI)

This report summarizes the activities of the JPL Solar Thermal Power Systems Parabolic Dish Project for FY 1983. Included are discussions on designs of module development including their concentrator, receiver, and power conversion subsystem together with a separate discussion of concentrator development. Analyses and test results, along with progress on field tests, Small Community Experiment system development, and tests at the Parabolic Dish Test Site are also included.

Not Available

1984-04-15T23:59:59.000Z

195

Annual site environmental report for calendar year 1995  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1995 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. Western operates and maintains nearly 17,000 miles of transmission lines, 257 substations, and various appurtenant power facilities in fifteen central and western states. Western is also responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 55 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has over 400 facilities located in these states, this report addresses the environmental activities in all the facilities as one site.

NONE

1995-12-31T23:59:59.000Z

196

Annual site environmental report for calendar year 1988  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1988-12-31T23:59:59.000Z

197

Annual site environmental report for calendar year 1991  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

NONE

1991-12-31T23:59:59.000Z

198

Laboratory directed research and development annual report: Fiscal year 1992  

Science Conference Proceedings (OSTI)

The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this order. Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches to research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as: integrated environmental research; process science and engineering; energy distribution and utilization. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these corecompetencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.

Not Available

1993-01-01T23:59:59.000Z

199

Laboratory directed research and development annual report: Fiscal year 1992  

Science Conference Proceedings (OSTI)

The Department of Energy Order DOE 5000.4A establishes DOE's policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this order. Consistent with the Mission Statement and Strategic Plan provided in PNL's Institutional Plan, the LDRD investments are focused on developing new and innovative approaches to research related to our core competencies.'' Currently, PNL's core competencies have been identified as: integrated environmental research; process science and engineering; energy distribution and utilization. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these corecompetencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. The projects described in this report represent PNL's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL's LDRD program and the management process used for the program and project summaries for each LDRD project.

Not Available

1993-01-01T23:59:59.000Z

200

Annual site environmental report for calendar year 1991  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in 15 states, this report was written to address the environmental activities in all of the facilities as one ``site``. In 1991, Western provided power to 615 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

1991-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Annual site environmental report for calendar year 1992  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1992 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy (DOE) Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.`` In 1992, Western provided power to 612 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, Federal and State agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provided service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of more than 16,450 miles of transmission lines, 268 substations, 51 hydroelectric power plants, and a coal-fired power plant.

1992-12-31T23:59:59.000Z

202

Annual site environmental report for calendar year 1993  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1993 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 States, this report addresses the environmental activities in all the facilities as one ``site``. In 1993, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

1993-12-31T23:59:59.000Z

203

Annual site environmental report for calendar year 1994  

SciTech Connect

The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site``. In 1994, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of nearly 17,000 miles of transmission lines, 271 substations, 55 hydroelectric power stations, and a coal-fired power plant.

1994-12-31T23:59:59.000Z

204

Annual Report for the Year 2000-2001  

E-Print Network (OSTI)

. The lower-ground floor extends beyond the circular footprint of the upper floors, providing space for over 5,000 metres of shelving for bound periodical volumes and 50 computer workstations. North-west corner extension The end of the year also saw... almost impossible to obtain, continued with purchases including over 5,000 sheets of China at 1:100,000 scale. This is the only publicly available set in the United Kingdom and is already being well used. With the help of financial contributions from...

Cambridge University Library

2001-01-01T23:59:59.000Z

205

Annual Report for the Year 2002-2003  

E-Print Network (OSTI)

online in March ????, making the database for ????-???? available alongside the printed and CD-ROM editions. Crowds awaiting the arrival of the royal party in Amritsar during the visit of Prince George and Princess Mary to India in 1905-6. (Royal... Figures representing each of the Four Winds of Heaven, on the corners of the tower. (From the exhibition ‘Speaking volumes: 600 years of Cambridge University Library’.) M ar k Sc ud de r 19 Yet another reorganisation within the National Health Service...

Cambridge University Library

2003-01-01T23:59:59.000Z

206

Transformer requirements for the year 2000. Final report, December 1979  

Science Conference Proceedings (OSTI)

The principal objective of this program was to determine the design parameters required for transformers of the year 2000. The approach to meeting this objective was to determine the changes which may occur in transmission and distribution systems over the next twenty years, and how these changes might affect design parameters of distribution and power transformers. Emphasis was placed on domestic requirements, although the impact of international practices was factored into the overall requirements for transformers. Possible investigations that could help transformer designers meet the long term technical requirements of future transformers were also identified. The principal conclusions of this study were: 1200 kV transmission could be in service by the late 1980's and it is essential to develop 1200 kV transformers for these systems; transformer manufacturers must be prepared to supply higher MVA ratings at all voltage levels; there will be a strong demand for low-loss, minimum cost transformers; and environmental/safety, reliability, and size reduction considerations will increase in importance. (LLL)

Not Available

1980-06-01T23:59:59.000Z

207

Generic Disposal System Modeling--Fiscal Year 2011 Progress Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12/2011 12/2011 Rev. 2 FCRD- T10-201 0-00005 FCRD Technical Integration Office (TIO) DOCUMENT NUMBER REQUEST TRANSMITTAL SHEET 1. Document Information Document Title/Description: Generic Disposal System Modeling--Fiscal Year 2011 Revision: 0 Progress Re~ort Assigned Document Number: FCRD-USED-2011-000184 Effective Start Date: 08/1112011 Document Author/Creator: D. Clayton, G. Freeze, T. Hadgu, E. Hardin, J. Lee, OR .~: J. Prouty, R. Rogers, W.M. Nutt, J. Berkholzer, H.H. Liu, L. Zheng, S. Chu Document Owner: Palmer Vaughn Date Range: Originating Organization: Sandia National Laboratories From: To: Milestone OM1 ~M2 OM3 ~M4 o Not a Milestone Milestone Number:: M21UF034101 and M41UF035102 Work Package WBS Number: FTSN11 UF0341 and FTSN11 UF0351; 1.02.08.03 Controlled Unclassified Infonnation (CUI) Type ~ None OOUO OAT o Other FCRD SYSTEM: Year: o FUEL Fuels 2011 OINTL International

208

Brookhaven National Laboratory site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

Naidu, J.R.; Royce, B.A. [eds.

1994-05-01T23:59:59.000Z

209

Laboratory Directed Research and Development annual report, Fiscal year 1993  

SciTech Connect

The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. LDRD includes activities previously defined as ER&D, as well as other discretionary research and development activities not provided for in a DOE program.`` Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as integrated environmental research; process technology; energy systems research. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. The projects are described in Section 2.0. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.

Not Available

1994-01-01T23:59:59.000Z

210

Strategic Petroleum Reserve Site Environmental Report for calendar year 1994  

Science Conference Proceedings (OSTI)

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. The SER, provided annually in accordance with Department of Energy DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the Strategic Petroleum Reserve (SPR) impacts the environment. This report (SER) provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1994. Two of these highlights include decommissioning of the Weeks Island facility (disposition of 73 million barrels of crude oil inventory) as well as the degasification of up to 144 million barrels of crude oil inventory at the Bayou Choctaw, Big Hill, Bryan Mound, and West Hackberry facilities. The decision to decommission the Weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Degasifying the crude oil is required to reduce potentially harmful emissions that would occur during oil movements. With regard to still another major environmental action, 43 of the original 84 environmental findings from the 1992 DOE Tiger Team Assessment were closed by the end of 1994. Spills to the environment, another major topic, indicates a positive trend. Total volume of oil spilled in 1994 was only 39 barrels, down from 232 barrels in 1993, and the total volume of brine spilled was only 90 barrels, down from 370 barrels in 1993. The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to nine in 1994.

NONE

1995-05-31T23:59:59.000Z

211

Energy Materials Coordinating Committee, fiscal year 1997. Annual technical report  

SciTech Connect

The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department`s materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. This report summarizes EMaCC activities for FY 1997 and describes the materials research programs of various offices and divisions within the Department.

NONE

1998-07-31T23:59:59.000Z

212

Hanford Site Environmental Report for calendar year 1992  

SciTech Connect

This report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations at the Hanford Site. The following sections: describe the Hanford Site and its mission; summarize the status in 1992 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; discuss public dose estimates from 1992 Hanford activities; present information on effluent monitoring and environmental surveillance, including ground-water protection and monitoring, and discuss activities to ensure quality.

Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. [eds.

1993-06-01T23:59:59.000Z

213

Pinellas Plant Annual Site Environmental Report for calendar year 1994  

Science Conference Proceedings (OSTI)

This report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant, in Pinellas County, Florida for 1994. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1994. As a result of the end of Department of Energy Defense Programs mission production on September 30, 1994, considerable changes at the Pinellas Plant occurred. These changes, which included transitioning the plant toward alternate use in support of economic development and safe shutdown, both increased and heightened Environmental, Safety and Health responsibilities. In December 1994, the Department of Energy announced it had reached an agreement to sell the Pinellas Plant to the Pinellas County Industry Council in March 1995. The plant is being leased back by the Department of Energy through September 1997 to complete safe shutdown, reconfiguration, transfer of equipment to other Department of Energy production facilities, and transition to commercial ventures. Permit modifications and transfers will be completed during 1995 to reflect the new ownership by the Pinellas County Industry Council and to include new tenants as needed.

NONE

1995-06-01T23:59:59.000Z

214

Annual site environmental report for calendar year 1999  

Science Conference Proceedings (OSTI)

Many State and Federal environmental protection laws and regulations apply to Western. Western facilities are within the jurisdiction of six Environmental Protection Agency (EPA) regions and 17 states. Western's environmental policy statement directs employees to prevent, control, and abate environmental pollution at their facilities, and when possible, enhance the environment. To help assure conformance with all regulatory requirements, and to achieve its pollution prevention goals and objectives, Western is developing an Environmental Management System (EMS). One of the major regulatory impacts on Western continues to be the Toxic Substances Control Act (TSCA) that regulates the use of polychlorinated biphenyls (PCB). Western's policy is to eliminate PCBs from its system wherever economically and operationally possible. This will lessen the impact of PCB regulations on operations and the impact of PCBs on the environment. Executive Order 12856 requires Federal Agencies to comply with the Emergency Planning and Community Right-to-Know Act (EPCRA). As with other DOE elements, Western has been complying with EPCRA since before the Executive Order was issued. To summarize, in 1999, Western's Regional offices implemented programs to notify State and local emergency response entities in accordance with Section 311 and 312 of EPCRA. Chemical inventories indicate that Western does not manufacture, process, or otherwise use reportable quantities of EPCRA Section 313 chemicals so Toxic Release reports were not required.

NONE

2000-04-14T23:59:59.000Z

215

Strategic Petroleum Reserve site environmental report for calendar year 1997  

SciTech Connect

The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts for the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a describe of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1997. Two of these highlights include decommissioning of the Weeks Island site, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 12.6 million m{sup 3} (79.3 million barrels) of crude oil inventory at the Big Hill and Bryan Mound facilities.

NONE

1998-11-01T23:59:59.000Z

216

Nuclear Test-Experimental Science: Annual report, fiscal year 1988  

Science Conference Proceedings (OSTI)

Fiscal year 1988 has been a significant, rewarding, and exciting period for Lawrence Livermore National Laboratory's nuclear testing program. It was significant in that the Laboratory's new director chose to focus strongly on the program's activities and to commit to a revitalized emphasis on testing and the experimental science that underlies it. It was rewarding in that revolutionary new measurement techniques were fielded on recent important and highly complicated underground nuclear tests with truly incredible results. And it was exciting in that the sophisticated and fundamental problems of weapons science that are now being addressed experimentally are yielding new challenges and understanding in ways that stimulate and reward the brightest and best of scientists. During FY88 the program was reorganized to emphasize our commitment to experimental science. The name of the program was changed to reflect this commitment, becoming the Nuclear Test-Experimental Science (NTES) Program.

Struble, G.L.; Donohue, M.L.; Bucciarelli, G.; Hymer, J.D.; Kirvel, R.D.; Middleton, C.; Prono, J.; Reid, S.; Strack, B. (eds.)

1988-01-01T23:59:59.000Z

217

BROOKHAVEN NATIONAL LABORATORY SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1994.  

SciTech Connect

This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment were evaluated. Among the permitted facilities, two instances of pH exceedances were observed at recharge basins, possibly related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant to the Peconic River exceeded. on ten occasions, one each for fecal coliform and 5-day Biochemical Oxygen Demand (avg.) and eight for ammonia nitrogen. The ammonia and Biochemical Oxygen Demand exceedances were attributed to the cold winter and the routine cultivation of the sand filter beds which resulted in the hydraulic overloading of the filter beds and the possible destruction of nitrifying bacteria. The on-set of warm weather and increased aeration of the filter beds via cultivation helped to alleviate this condition. The discharge of fecal coliform may also be linked to this occurrence, in that the increase in fecal coliform coincided with the increased cultivation of the sand filter beds. The environmental monitoring data has identified site-specific contamination of groundwater and soil. These areas are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement. Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public or to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

NAIDU,J.R.; ROYCE,B.A.

1995-05-01T23:59:59.000Z

218

Kansas State University electric vehicle site operator program. Year 1, second quarter report, October 1, 1991--December 30, 1991  

DOE Green Energy (OSTI)

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State`s Site Operator Program continues to get the ``word-out`` about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State`s G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states`s program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State`s program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

219

Third Quarter Hanford Seismic Report for Fiscal Year 2009  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 771 local earthquakes during the third quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during the January – March 2009 time period and reported in the previous quarterly report (Rohay et al, 2009). The frequency of Wooded Island events has subsided with 16 events recorded during June 2009. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 25 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.2 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest activity and individuals living in homes directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. The Hanford Strong Motion Accelerometer (SMA) network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration value recorded by the SMA network was approximately 3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressure that has built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2009-09-30T23:59:59.000Z

220

Hangman Restoration Project Year-End Report FY2008.  

DOE Green Energy (OSTI)

This report covers the main goals of FY2008 from which the Work Elements were derived. The goals and products are listed by heading and the associated work elements are referenced in the text. A list of the FY2008 Work Elements is included as Appendix A. FY2008 witnessed the completion of the hntkwipn Management Plan and the first substantive efforts to restore the important habitats encompassed by the mitigation properties in the Upper Hangman Watershed. Native grasses were planted and germination was evaluated. Also, drain tiles that greatly altered the hydrologic function of the Sheep and Hangman Creek Flood Plains were removed and/or disrupted. Preparation for future restoration efforts were also made in FY2008. Designs were produced for the realignment of Sheep Creek and the decommissioning of seven drainage ditches within hntkwipn. A prioritization plan was drafted that greatly expands the area of focus for restoring native fish population in Hangman Creek.

Coeur d'Alene Tribe Department of Natural Resources.

2008-11-12T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Inert electrodes program: Fiscal Year 1987 Annual Report  

DOE Green Energy (OSTI)

The Inert Electrodes Program is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE), Office of Industrial Programs (OIP). The purpose of the program is to develop long-lasting, energy-efficient anodes, cathodes, and ancillary equipment for Hall-Heroult cells used by aluminum industry. The program is divided into three tasks with the following objectives: Inert Anode Development - to improve the energy efficiency of Hall-Heroult cells by development of inert anodes; Stable Cathode Studies - to develop methods for retrofitting Hall-Heroult cells with TiB/sub 2/-based cathode materials; and Sensor Development - to devise sensors to control the chemistry of Hall-Heroult Cells using stable anodes and cathodes. This Inert Electrodes Program annual report highlights the major technical accomplishment of FY 1987. The accomplishments are presented in the following sections: Management, Materials Development and Testing, Materials Evaluation, Stable Cathode Studies, and Sensor Development. 50 refs., 47 figs.

Koski, O.H.; Marschman, S.C.; Schilling, C.H.; Windisch, C.F.

1988-12-01T23:59:59.000Z

222

Naval Reactors Facility environmental monitoring report, calendar year 2001  

Science Conference Proceedings (OSTI)

The results of the radiological and nonradiological environmental monitoring programs for 2001 at the Naval Reactors Facility are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U. S. Environmental Protection Agency and the U. S. Department of Energy.

NONE

2002-12-31T23:59:59.000Z

223

Naval Reactors Facility environmental monitoring report, calendar year 1999  

Science Conference Proceedings (OSTI)

The results of the radiological and nonradiological environmental monitoring programs for 1999 at the Naval Reactors Facility (NRF) are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE).

None

2000-12-01T23:59:59.000Z

224

Naval Reactors Facility environmental monitoring report, calendar year 2000  

Science Conference Proceedings (OSTI)

The results of the radiological and nonradiological environmental monitoring programs for 2000 at the Naval Reactors Facility (NRF) are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE).

None

2001-12-01T23:59:59.000Z

225

Naval Reactors Facility Environmental Monitoring Report, Calendar Year 2003  

Science Conference Proceedings (OSTI)

The results of the radiological and nonradiological environmental monitoring programs for 2003 at the Naval Reactors Facility are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U.S. Environmental Protection Agency and the U.S. Department of Energy.

None

2003-12-31T23:59:59.000Z

226

Controller's 2006 annual report : fiscal year ending September 30, 2006.  

Science Conference Proceedings (OSTI)

I am pleased to present the CFO's FY06 Financial Report for Sandia National Laboratories (SNL). As a contractor to DOE and other government agencies, the bulk of SNL's revenue is from tax dollars. SNL's FY06 total revenue, total expenditures, and total employment levels were slightly below the FY05 record high levels. Throughout FY06, SNL business staff continued to improve SNL's financial stewardship of entrusted taxpayer funds through implementation of best-in-class practices in financial business operations and internal control policies and procedures to ensure compliance with all accounting standards and provide accountability to our customers. Our FY06 efforts focused on process certification and improvement, implementing OMB Circular A-123, achieving assurance activities, implementation of a Financial Management Competency Program throughout SNL, and continuous assessment of trends and emerging issues.

Crooks, Jennifer Shuk-Ian

2007-02-01T23:59:59.000Z

227

X-Ray Diffraction Project Final Report, Fiscal Year 2006  

SciTech Connect

An x-ray diffraction diagnostic system was developed for determining real-time shock-driven lattice parameter shifts in single crystals at the gas gun at TA-IV at Sandia National Laboratories (SNL). The signal-to-noise ratio and resolution of the system were measured using imaging plates as the detector and by varying the slit width. This report includes tests of the x-ray diffraction system using a phosphor coupled to a charge-coupled device (CCD) camera by a coherent fiber-optic bundle. The system timing delay was measured with a newly installed transistor-transistor logic (TTL) bypass designed to reduce the x-ray delay time. The axial misalignment of the Bragg planes was determined with respect to the optical axis for a set of eight LiF [lithium fluoride] crystals provided by SNL to determine their suitability for gas gun experiments.

Dane V. Morgan

2006-10-01T23:59:59.000Z

228

Natural gas annual 1992: Supplement: Company profiles  

SciTech Connect

The data for the Natural Gas Annual 1991 Supplement : Company Profiles are taken from Form EIA-176, (open quotes) Annual Report of Natural and Supplemental Gas Supply and Disposition (close quotes). Other sources include industry literature and corporate annual reports to shareholders. The companies appearing in this report are major interstate natural gas pipeline companies, large distribution companies, or combination companies with both pipeline and distribution operations. The report contains profiles of 45 corporate families. The profiles describe briefly each company, where it operates, and any important issues that the company faces. The purpose of this report is to show the movement of natural gas through the various States served by the 45 large companies profiled.

Not Available

1994-01-01T23:59:59.000Z

229

Natural gas annual 1993 supplement: Company profiles  

Science Conference Proceedings (OSTI)

The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

Not Available

1995-02-01T23:59:59.000Z

230

OTEC Utility Users Council. Final grant termination report, second year activities  

DOE Green Energy (OSTI)

The second year of the activities of the OTEC Utility Users Council is reported, including meetings and a statement on the DOE OTEC Pilot Plant. (LEW)

Not Available

1982-09-01T23:59:59.000Z

231

300 Area D4 Project Fiscal Year 2010 Building Completion Report  

SciTech Connect

This report summarizes the deactiviation, decontamination, decommissioning, and demolition activities of facilities in the 300 Area of the Hanford Site in fiscal year 2010.

Skwarek, B. J.

2011-01-27T23:59:59.000Z

232

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2005-09-30T23:59:59.000Z

233

First Quarter Hanford Seismic Report for Fiscal Year 2009  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. This includes three recently acquired Transportable Array stations located at Cold Creek, Didier Farms, and Phinney Hill. For the Hanford Seismic Network, ten local earthquakes were recorded during the first quarter of fiscal year 2009. All earthquakes were considered as “minor” with magnitudes (Mc) less than 1.0. Two earthquakes were located at shallow depths (less than 4 km), most likely in the Columbia River basalts; five earthquakes at intermediate depths (between 4 and 9 km), most likely in the sub-basalt sediments); and three earthquakes were located at depths greater than 9 km, within the basement. Geographically, four earthquakes occurred in known swarm areas and six earthquakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2009-03-15T23:59:59.000Z

234

Performance of battery charge controllers: First year test report  

DOE Green Energy (OSTI)

The results of the first year of an evaluation of charge controllers for stand-alone photovoltaic (PV) systems are presented. The objectives of the test program are to positively influence the development of battery charge controllers for stand-alone PV applications and to develop design and application criteria that will improve PV system reliability and battery performance. Future goals are to expand the evaluation program to include various battery technologies and controller algorithms. Also, the information is being communicated to manufacturers to aid in the design of more effective and reliable charge controllers for PV systems. Eight different models of small (nominal 10 amp) charge controllers are being subjected to a comprehensive evaluation. These evaluations include operational tests in identical stand-alone PV systems and environmental and electrical cycling tests. Selected custom tests are also performed on the controllers to determine the response to transients, installation requirements and system design compatibilities. Data presented in this paper include measured electrical characteristics of the controllers, temperature effects on set points, and operational performance in PV systems both in the lab and in the field. A comparison is presented for four different charge controller algorithms which include array-shunt, series-interrupting, series-linear constant-voltage and series-linear-multistep constant-current. 9 refs., 11 figs., 2 tabs.

Dunlop, J. (Florida Solar Energy Center, Cape Canaveral, FL (United States)); Bower, W. (Sandia National Labs., Albuquerque, NM (United States)); Harrington, S. (Ktech Corp., Albuquerque, NM (United States))

1991-01-01T23:59:59.000Z

235

Southwestern Power Administration site environmental report for calendar year 1993  

DOE Green Energy (OSTI)

During CY 93, Southwestern was not involved in any programs that had a direct effect on the environment, involving endangered species, protection of wetlands, or increased electromagnetic radiation. Southwestern continued to function throughout the year in an operations and maintenance posture with minor substation projects. Southwestern received an environmental management audit by the Department of Energy`s Office of Environmental Audit (EH-24), during CY 1992. The purpose of the audit was to give Southwestern, DOE headquarters, and the Secretary an indication of the status of Southwestern management`s effectiveness in discharging its duties in an environmentally responsible manner. The audit identified 17 findings. An action plan was developed and remediation of the findings has been accomplished. Several strengths were identified during the audit with regard to the environmental programs at Southwestern. Most importantly, senior management at Southwestern has taken actions to increase environmental awareness throughout the organization which is evidenced by the creation of the Environmental, Safety, Health, and Security Office.

Not Available

1994-06-01T23:59:59.000Z

236

Geothermal reservoir well stimulation program. First-year progress report  

DOE Green Energy (OSTI)

The Geothermal Reservoir Well Stimulation Program (GRWSP) group planned and executed two field experiments at the Raft River KGRA during 1979. Well RRGP-4 was stimulated using a dendritic (Kiel) hydraulic fracture technique and Well RRGP-5 was stimulated using a conventional massive hydraulic fracture technique. Both experiments were technically successful; however, the post-stimulation productivity of the wells was disappointing. Even though the artificially induced fractures probably successfully connected with the natural fracture system, reservoir performance data suggest that productivity remained low due to the fundamentally limited flow capacity of the natural fractures in the affected region of the reservoir. Other accomplishments during the first year of the program may be summarized as follows: An assessment was made of current well stimulation technology upon which to base geothermal applications. Numerous reservoirs were evaluated as potential candidates for field experiments. A recommended list of candidates was developed which includes Raft River, East Mesa, Westmorland, Baca, Brawley, The Geysers and Roosevelt Hot Springs. Stimulation materials (fracture fluids, proppants, RA tracer chemicals, etc.) were screened for high temperature properties, and promising materials selected for further laboratory testing. Numerical models were developed to aid in predicting and evaluating stimulation experiments. (MHR)

Not Available

1980-02-01T23:59:59.000Z

237

Hanford Site Rare Plant Monitoring Report for Calendar Year 2012  

SciTech Connect

Two patches of Columbian yellowcress on the Hanford Reach were visited in both 2011 and 2012 to compare ramet counts between years: near Allerd Pumphouse (Rkm 615.4) and near White Bluffs Boat Launch (Rkm 593.3) (Figure 3). In 2012, the population near Allerd Pumphouse had 45 ramets present within a 5x3 m area. At the same population in 2011, there were 60 ramets. In 2012, the population near White Bluffs Boat Launch had 105 ramets in a 2x2 m area. At the same population in 2011, there were 100 ramets. This data shows that while annual variability does exist, ramet counts were relatively similar from 2011 to 2012. This is likely due to the similar flow regimes of 2011 and 2012, which both had above average snowpack, high flows, and extended spring flooding seasons. A total of 19.6 miles (31.5 km) of the Hanford shoreline were surveyed in 2012, with ten patches identified and approximately 1,250 ramets counted. It is not known how many individual plants this count represents due to the rhizomatous nature of the species. Two of these sites were identified previously in the WNHP database, and the remaining eight were newly identified locations. Eleven of the ramets had flowers and/or buds in the patches located during 2012, but no fruits were found

Salstrom, D; Easterly, R; Lindsey, Cole T.; Nugent, John J.

2013-03-21T23:59:59.000Z

238

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

239

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

240

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

242

Company Level Imports Explanatory Notes  

Gasoline and Diesel Fuel Update (EIA)

Company Level Imports Explanatory Notes Company Level Imports Explanatory Notes Notice: Ongoing analysis of imports data to the Energy Information Administration reveals that some imports are not correctly reported on Form EIA-814 "Monthly Imports Report". Contact with the companies provides sufficient information for EIA to include these imports in the data even though they have not provided complete reports on Form EIA-814. Estimates are included in aggregate data, but the estimates are not included in the file of Company-Level Imports. Therefore, summation of volumes for PAD Districts 1-5 from the Company-Level Imports will not equal aggregate import totals. Explanation of Codes Used in Imports Database Files SURVEY_ID EIA-814 Survey Form Number for Collecting Petroleum Import Statistics

243

Interagency Geothermal Coordinating Council Annual Report for Fiscal Year 1989  

SciTech Connect

The U.S. Interagency Geothermal Coordinating Council was a multi-agency group charged with identifying and reducing barriers to geothermal energy development in the U.S. Many of the issues covered related to regulations for and progress in the leasing of Federal lands in the West for power development. The IGCC reports are important sources of historical information. Table 1 lists significant events in the history of use of geothermal energy in the U.S., starting in1884. That is useful for tracking which Federal departments and agencies managed aspects of this work over time. Table 2 gives a complete accounting for all Federal outlays for geothermal energy development for FY 1979 - 1989, including non-DOE outlays. Table 3 shows the status of the U.S. Geothermal Loan Guarantee Program at end of FY 1989: of the $500 million authorized, $285 million was committed to eight projects, and about $40 million had been paid out on project defaults. An additional $101 million had been repaid by the borrowers. (DJE 2005)

None

1990-01-02T23:59:59.000Z

244

Energy Division progress report, fiscal years 1994--1995  

Science Conference Proceedings (OSTI)

At ORNL, the Energy Division`s mission is to provide innovative solutions to energy and related issues of national and global importance through interdisciplinary research and development. Its goals and accomplishments are described in this progress report for FY 1994 and FY 1995. The Division`s expenditures in FY 1995 totaled 44.9 million. Sixty percent of the divisions work was supported by the US DOE. Other significant sponsors include the US DOT, the US DOD, other federal agencies, and some private organizations. The Division`s programmatic activities cover three main areas: (1) analysis and assessment, (2) transportation systems, and (3) energy use and delivery technologies. Analysis and assessment activities involve energy and resource analysis, preparation of environmental assessments and impact statements, and impact statements, research on emergency preparedness, analysis of energy and environmental needs in developing countries, and transportation analysis. Transportation systems research seeks to improve the quality of both civilian and military transportation efforts. Energy use and delivery technologies focus on building equipment, building envelopes, (walls, roofs, attics, and materials), improvement of energy efficiency in buildings, and electric power systems.

Moser, C.I. [ed.

1996-06-01T23:59:59.000Z

245

Second Quarter Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, seven local earthquakes were recorded during the second quarter of fiscal year 2008. The largest event recorded by the network during the second quarter (February 3, 2008 - magnitude 2.3 Mc) was located northeast of Richland in Franklin County at a depth of 22.5 km. With regard to the depth distribution, two earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), three earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and two earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, five earthquakes occurred in swarm areas and two earthquakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-06-26T23:59:59.000Z

246

First Quarter Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, forty-four local earthquakes were recorded during the first quarter of fiscal year 2008. A total of thirty-one micro earthquakes were recorded within the Rattlesnake Mountain swarm area at depths in the 5-8 km range, most likely within the pre-basalt sediments. The largest event recorded by the network during the first quarter (November 25, 2007 - magnitude 1.5 Mc) was located within this swarm area at a depth of 4.3 km. With regard to the depth distribution, three earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), thirty-six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and five earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, thirty-eight earthquakes occurred in swarm areas and six earth¬quakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-03-21T23:59:59.000Z

247

Hot Dry Rock energy annual report fiscal year 1992  

DOE Green Energy (OSTI)

Hot Dry Rock technology took a giant leap forward this year as the long-awaited long-term flow test (LTFT) of the Phase II HDR reservoir at Fenton Hill got underway. Energy was produced on a twenty-four hour a day basis for a continuous period of nearly four months of steady-state testing. Hot water was brought to the surface at 90-100 gallons per minute (gpm) with temperatures of 180[degrees]C (356[degrees]F) and higher. During that time, the HDR plant achieved an on-line record of 98.8%. Surface temperature measurements and temperature logging deep within the wellbore confirmed that no decline in the average temperature of fluid produced from the reservoir occurred. Tracer experiments indicated that flow paths within the reservoir were undergoing continuous change during the test. Remarkably, it appeared that longer flow paths carried a larger proportion of the flow as the test proceeded, while more direct fluid pathways disappeared or carried a significantly reduced flow. In sum, access to hot rock appeared to improve over the span of the test. Water losses during the test averaged 10-12% and showed a slow long-term decline. These results confirmed what had been previously discovered in static pressurization testing: Water consumption declines significantly during extended operation of an HDR reservoir. In combination with a recent demonstration by the Japanese that water losses can be greatly reduced by the proper placement of multiple production wells, the recent results at Fenton Hill have effectively demonstrated that excessive water consumption should not be an issue for a properly engineered HDR facility at a well chosen site.

Duchane, D.V.; Winchester, W.W.

1993-04-01T23:59:59.000Z

248

Hot Dry Rock energy annual report fiscal year 1992  

DOE Green Energy (OSTI)

Hot Dry Rock technology took a giant leap forward this year as the long-awaited long-term flow test (LTFT) of the Phase 2 HDR reservoir at Fenton Hill got underway. Energy was produced on a twenty-four hour a day basis for a continuous period of nearly four months of steady-state testing. Hot water was brought to the surface at 90--100 gallons per minute (gpm) with temperatures of 180{degrees}C (356{degrees}F) and higher. During that time, the HDR plant achieved an on-line record of 98.8%. Surface temperature measurements and temperature logging deep within the wellbore confirmed that no decline in the average temperature of fluid produced from the reservoir occurred. Tracer experiments indicated that flow paths within the reservoir were undergoing continuous change during the test. Remarkably, it appeared that longer flow paths carried a larger proportion of the flow as the test proceeded, while more direct fluid pathways disappeared or carried a significantly reduced flow. In sum, access to hot rock appeared to improve over the span of the test. Water losses during the test averaged 10--12% and showed a slow long-term decline. These results confirmed what had been previously discovered in static pressurization testing: Water consumption declines significantly during extended operation of an HDR reservoir. In combination with a recent demonstration by the Japanese that water losses can be greatly reduced by the proper placement of multiple production wells, the recent results at Fenton Hill have effectively demonstrated that excessive water consumption should not be an issue for a properly engineered HDR facility at a well chosen site.

Winchester, W.W. [ed.; Duchane, D.V.

1993-04-01T23:59:59.000Z

249

Computer-aided engineering annual report for calendar year 1989  

Science Conference Proceedings (OSTI)

During calendar year 1989, EG G Idaho completed the initial procurement and implementation of a major new Computer-Aided Engineering (CAE) system. Seventy new workstations and associated engineering applications were installed over 100 personal computers (PCs) were integrated into the environment, and communications links to the IBM mainframes and the Cray supercomputer were established. The system achieves integration through sophisticated data communications and application interfaces that allow data sharing across the entire environment. Applications available on the system facilitate engineering relate to full three-dimensional (3-D) piping, heating/ventilating/air conditioning (HAVC), structural and steel design, solids modeling and analysis, desktop publishing, design and drafting, and include automated links to various analysis codes on the Cray supercomputer. The system also provides commonly used engineering tools such as spreadsheets, language compilers, terminal emulation, and file transfer facilities. Although difficult to quantify, recent information has shown that projected annual productivity improvement to the Idaho National Engineering Laboratory (INEL) will be in excess of $2,000,000. This improvement will be generated in a variety of areas including improvement in the efficiency of individual users, checkplot production, data management, file transfers, plotting. design-analysis interfaces, and the benefit of full 3-D design. Current plans call for a significant expansion of the CAE system in 1990 with continued expansion through 1993. Additional workstations, system software and utilities, networking facilities and applications software will be procured and implemented. More than one hundred people will receive training on the various application packages during 1990. Efforts to extend networking throughout the INEL will be continued. 2 refs.

Brockelsby, H.C. Jr.

1990-03-01T23:59:59.000Z

250

Valuing Mutual Fund Companies  

E-Print Network (OSTI)

Valuing Mutual Fund Companies 1 Jacob Boudoukh a , Matthew1a Valuing Mutual Fund Companies ABSTRACT Combining insightsdata from the Investment Company Institute. Given the size

Boudoukh, Jacob; Richardson, Matthew; Stanton, Richard; Whitelaw, Robert F.

2004-01-01T23:59:59.000Z

251

Annual Hanford Seismic Report for Fiscal Year 2009  

SciTech Connect

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During FY 2009, the Hanford Seismic Network recorded nearly 3000 triggers on the seismometer system, which included over 1700 seismic events in the southeast Washington area and an additional 370 regional and teleseismic events. There were 1648 events determined to be local earthquakes relevant to the Hanford Site. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. Recording of the Wooded Island events began in January with over 250 events per month through June 2009. The frequency of events decreased starting in July 2009 to approximately 10-15 events per month through September 2009. Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with 47 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.3 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The highest-magnitude event (3.0Mc) occurred on May 13, 2009 within the Wooded Island swarm at depth 1.8 km. With regard to the depth distribution, 1613 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 18 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 17 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 1630 earthquakes were located in swarm areas and 18 earthquakes were classified as random events. The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest activity and individuals living in homes directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. The Hanford Strong Motion Accelerometer (SMA) network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration value recorded by the SMA network was approximately 3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressure that has built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2009-12-31T23:59:59.000Z

252

Yearly  

E-Print Network (OSTI)

In 2009, a new activity was launched under the International Energy Agency Wind Implementing Agreement (IEA Wind) for the small wind sector. The main focus of this activity, called Task 27, is to develop recommended practices for consumer labeling of existing commercial small wind turbines. Participants will also exchange information about the status of the small wind industry in the member countries. This report outlines the status of the small wind sector in 2009 in the countries participating in Task 27. (For more information about IEA Wind and the consumer label developed under Task 27, see www.ieawind.org.)

unknown authors

2009-01-01T23:59:59.000Z

253

Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996  

SciTech Connect

During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

1996-12-31T23:59:59.000Z

254

High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance  

DOE Green Energy (OSTI)

This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly total than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.

Wilson, L.E.; McGuire, D.R.

1984-05-01T23:59:59.000Z

255

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2008-12-17T23:59:59.000Z

256

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2007-09-27T23:59:59.000Z

257

West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005  

Science Conference Proceedings (OSTI)

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

2006-09-21T23:59:59.000Z

258

Sandia National Laboratories, California pollution prevention annual program report for calendar year 2005.  

Science Conference Proceedings (OSTI)

The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the ''SNL/CA Environmental Management System Program Manual''. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA.

Farren, Laurie J. (Sandia National Laboratories, Livermore, CA)

2005-07-01T23:59:59.000Z

259

Idaho National Engineering Laboratory site environmental report for calendar year 1995  

Science Conference Proceedings (OSTI)

This report presents a compilation of data collected in 1995 for the routine environmental surveillance programs conducted on and around the Idaho National Engineering Laboratory (INEL). During 1995, the offsite surveillance program was conducted by the Environmental Science and Research Foundation. Onsite surveillance was performed by Lockheed Idaho Technologies Company (LITCO). Ground-water monitoring, both on and offsite, was performed by the US Geological Survey (USGS). This report also presents summaries of facility effluent monitoring data collected by INEL contractors. This report, prepared in accordance with the requirements in DOE Order 5400.1, is not intended to cover the numerous special environmental research programs being conducted at the INEL by the Foundation, LITCO, USGS, and others.

Mitchell, R.G.; Peterson, D.; Hoff, D.L.

1996-08-01T23:59:59.000Z

260

Health assessment for Texarkana Wood Preserving Company, Texarkana, Bowie County, Texas, Region 6. CERCLIS No. TXD008056152. Addendum. Final report  

SciTech Connect

The Texarkana Wood Preserving Company (TWPC) is a National Priorities List site located in northeastern Texas, at the southern extremity of the City of Texarkana in Bowie County. The TWPC site has been used for various lumber-related activities since the early 1900s and for creosoting operations since the early 1950s. Contaminated soils, groundwater, surface water, and surface water sediments have been detected on and off of the TWPC site. The primary contaminants of concern are polycyclic aromatic hydrocarbons, pentachlorophenol, chlorinated dibenzodioxins and chlorinated dibenzofurans. The population at greatest risk of exposure to these contaminants are on-site workers engaged in remedial activities. There are currently no residences or businesses located immediately adjacent to the site and no documentation that contaminated groundwater is being used for potable purposes. The Texarkana Wood Preserving Company site has been evaluated by the Agency for Toxic Substances and Disease Registry (ATSDR) Health Activities Recommendation Panel (HARP) for appropriate follow-up with respect to health activities.

Not Available

1992-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-06-01T23:59:59.000Z

262

Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

Bechtel Nevada

2005-03-01T23:59:59.000Z

263

Entity Name: ABC Company Entity ID:  

Gasoline and Diesel Fuel Update (EIA)

Entity Name: Entity Name: ABC Company Entity ID: 00000 Data Year: 2013 State Include or exclude pre-arranged interruptions? 1 2 3 Do you capture outage records for events that initiate outside your system (customer system that causes di 4 5 6 7 8 Point to calculation in P1782: use percentages weighted based upon the classification of the circuit. 9 10 11 12 REWORD: The percent of customers automatically reported when they have lost power? e.g. SCADA, AMI, Etc. 13 SAIDI value (w/o Major Events included) FORM EIA-861 OMB No. 1905-0129 ANNUAL ELECTRIC POWER INDUSTRY REPORT

264

Health assessment for Thompson-Hayward Chemical Company, Fresno, Fresno County, California, Region 9. CERCLIS No. CAD009106220. Preliminary report  

SciTech Connect

The Thompson-Hayward Chemical Company site is on the National Priorities List. The five-acre site is part of the former location of an agricultural chemical formulation, packaging, and warehousing plant that was in operation from 1942 until 1981. The environmental contamination on-site consists of pesticides, including DDT (3,800 ppm), toxaphene (100 ppm), dieldrin (5 ppm), Dinoseb (1,000 ppm), PCNB (pentachloronitrobenzene), Guthion, DEF (s,s,s-tributylphosphorotrithioate), chlordane, DBCP, chloroform, and 1,2-dichloroethane in ground water. The site is considered to be of potential public health concern because of the risk to human health caused by the possibility of exposure to hazardous substances via contaminated ground water.

Not Available

1988-12-05T23:59:59.000Z

265

Annual Report of the Integrated Status and Effectiveness Monitoring Program: Fiscal Year 2008  

DOE Green Energy (OSTI)

This document was created as an annual report detailing the accomplishments of the Integrated Status and Effectiveness Monitoring Program (ISEMP) in the Upper Columbia Basin in fiscal year 2008. The report consists of sub-chapters that reflect the various components of the program. Chapter 1 presents a report on programmatic coordination and accomplishments, and Chapters 2 through 4 provide a review of how ISEMP has progressed during the 2008 fiscal year in each of the pilot project subbasins: the John Day (Chapter 2), Wenatchee/Entiat (Chapter 3) and Salmon River (Chapter 4). Chapter 5 presents a report on the data management accomplishments in 2008.

Terraqua, Inc. (Wauconda, WA)

2009-07-20T23:59:59.000Z

266

HEAVY ION FUSION HALF-YEAR REPORT APRIL 1, 1980 - SEPTEMBER 30, 1980  

E-Print Network (OSTI)

of Rochester Ravi N. Sudan KMS Fusion, Inc. Henry J. GombergOF CALIFORNIA Accelerator & Fusion Research DivisionHEAVY ION FUSION HALF-YEAR REPORT APRIL 1, 1980 - SEPTEMBER

Authors, Various

2010-01-01T23:59:59.000Z

267

HEAVY ION FUSION YEAR-END REPORT APRIL 1, 1981 - SEPT. 30, 1981  

E-Print Network (OSTI)

Keefe E. Denis Keefe HEAVY ION FUSION ROSTER Warren W. ChuppOF CALIFORNIA Accelerator & Fusion Research DivisionHEAVY ION FUSION YEAR-END REPORT April 1, 1981 - September

Authors, Various

2010-01-01T23:59:59.000Z

268

U.S. Department of Energy Fiscal Year 2007 Buy American Act Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 U.S. Department of Energy Fiscal Year 2007 Buy American Act Report Total Mfg End Products Total Mfg End Products Department Actions Dollars Mfg in U.S. Actions ENERGY, DEPARTMENT...

269

Purchasing and Materials Management Organization, Sandia National Laboratories annual report, fiscal year 1993  

Science Conference Proceedings (OSTI)

This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1993. Activities for both the New Mexico and California locations are included.

Martin, D.R.

1994-02-01T23:59:59.000Z

270

Annual report procurement and logistics management center Sandia National Laboratories fiscal year 2002.  

Science Conference Proceedings (OSTI)

This report summarizes the purchasing and transportation activities of the Procurement and Logistics Management Center for Fiscal Year 2002. Activities for both the New Mexico and California locations are included.

Palmer, David L.

2003-05-01T23:59:59.000Z

271

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA FOR CALENDAR YEAR 2005  

SciTech Connect

This post-closure inspection report includes the results of inspections, maintenance and repair activities, and conclusions and recommendations for Calendar Year 2005 for nine Corrective Action Units located on the Tonopah Test Range , Nevada.

NONE

2006-06-01T23:59:59.000Z

272

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003  

Science Conference Proceedings (OSTI)

This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-04-01T23:59:59.000Z

273

Summary of the Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This small booklet provides highlights of the environmental monitoring at the Hanford Site during 2005. It is a summary of the information contained in the larger report: Hanford Site Environmental Monitoring for Calendar Year 2005.

Hanf, Robert W.; Morasch, Launa F.; Poston, Ted M.; Dirkes, Roger L.

2006-09-28T23:59:59.000Z

274

Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1998  

SciTech Connect

In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1998.

None

2000-03-20T23:59:59.000Z

275

Deep Vadose Zone–Applied Field Research Initiative Fiscal Year 2012 Annual Report  

Science Conference Proceedings (OSTI)

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2012.

Wellman, Dawn M.; Truex, Michael J.; Johnson, Timothy C.; Bunn, Amoret L.; Golovich, Elizabeth C.

2013-03-14T23:59:59.000Z

276

Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997  

Science Conference Proceedings (OSTI)

In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.

None

1999-08-13T23:59:59.000Z

277

Pacific Northwest National Laboratory Site Environmental Report for Calendar Year 2011  

Science Conference Proceedings (OSTI)

The PNNL Site Environmental Report for Calendar Year 2011 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2011 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

Duncan, Joanne P.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Stegen, Amanda; Barnett, J. M.; Su-Coker, Jennifer; Moon, Thomas W.; Ballinger, Marcel Y.; Dirkes, Roger L.; Opitz, Brian E.

2012-09-01T23:59:59.000Z

278

300 Area D4 Project Fiscal Year 2009 Building Completion Report  

SciTech Connect

This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

B. J. Skwarek

2010-01-27T23:59:59.000Z

279

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2012  

Science Conference Proceedings (OSTI)

The PNNL Annual Site Environmental Report for Calendar Year 2012 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2012 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

Duncan, Joanne P.; Ballinger, Marcel Y.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Barnett, J. M.; Su-Coker, Jennifer; Stegen, Amanda; Moon, Thomas W.; Becker, James M.; Raney, Elizabeth A.; Chamness, Michele A.; Mendez, Keith M.

2013-09-01T23:59:59.000Z

280

Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report  

SciTech Connect

Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

Stenner, Robert D.

2005-09-28T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Industrial-hygiene survey report of General Electric Company, Albuquerque, New Mexico, April 18-24, 1989  

Science Conference Proceedings (OSTI)

A walk through survey was conducted at the General Electric Company (SIC-3079), located in Albuquerque, New Mexico, to obtain information on the extent of exposure to 4,4{prime}-methylenedianiline (101779) (MDA) during hand layup work with preimpregnated graphite fabric while making molded jet engine parts, to obtain information on the elimination of MDA in the urine of potentially exposed workers, and to identify deficiencies in the handling of MDA and to offer recommendations for improving worker protection. A total of 210 worker urine samples was taken. Other samples taken included air samples, samples of glove washings, surface wipe samples, shoe samples, and bulk samples. From the data obtained it was possible to estimate the primary sources of exposure and their relative importance. Comparing the mass of airborne MDA inhaled with the amounts measured in the urine the following day suggested that skin contact was a significant contributory route of exposure. The author states that further efforts should therefore be made to reduce this exposure. Such efforts would include the selection of better personal protective equipment and improved work practices. Possible engineering modifications would be limited due to the manual nature of the work involved.

Boeniger, M.F.

1990-12-01T23:59:59.000Z

282

Feasibility assessment of low-head hydroelectric development at the Peninsular Paper Company dam in Ypsilanti, Michigan. Final report  

DOE Green Energy (OSTI)

The results of a study into the feasibility of developing a small, low-head dam site for hydroelectric generation in southeastern Michigan are presented. Average hydraulic head at the site is 13.0 ft, mean stream flow is 498 cfs. Economic, environmental and institutional factors were considered. Seven specific hypothetical designs were examined in detail, including vertical, bulb, cross-flow and tubular turbine designs. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and benefits. From an economic standpoint, it was found that the most cost-effective design for developing the site, although profitable, would not be financially attractive to the owner compared to other investment opportunities with which the company is faced. The projected after-tax return on investment for the project, based on current costs, was projected to be from 2 to 6%, depending upon the depreciation basis used. The project would, however, have a favorable effect on the corporation's working capital. The environmental issues associated with the development of the site would be relatively minor. The most important consequence would be enhanced public safety due to structural repairs to the dam and the availability of a small, independent source of electric generation that could be called on in times of power outages or natural disaster.

Not Available

1979-03-01T23:59:59.000Z

283

Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006  

Science Conference Proceedings (OSTI)

The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

Not Available

2007-03-01T23:59:59.000Z

284

Contract 98, Appendix F self-assessment report for Fiscal Year 2003  

Science Conference Proceedings (OSTI)

This report summarizes the Ernest Orlando Lawrence Berkeley National Laboratory internal assessment of Laboratory operational and administrative performance in key support functions for Fiscal Year (FY) 2003. The report provides documentation of ongoing performance-based management and oversight processes required by the Department of Energy (DOE) to monitor, measure, and evaluate Berkeley Lab work.

Albert (Editor), Rich

2003-10-15T23:59:59.000Z

285

Sun Labs-The First Five Years: The First Fifty Technical Reports. A Commemorative Issue  

Science Conference Proceedings (OSTI)

This commemorative issue in the technical report series encompasses the first five years of Sun Labs' existence from 1991 through 1996. In addition to the Abstracts of the first fifty reports, the contents include a list of patents issued during that ...

Ching-Chih Chang; Amy Hall; Jeanie Treichel

1998-09-01T23:59:59.000Z

286

Nuclear materials stabilization and packaging end-of-year status report, April 1--September 30, 1996  

SciTech Connect

This report documents progress on the Los Alamos Nuclear Materials Stabilization and Packaging projects for the third and fourth quarters of fiscal year 1996. It covers development and production activities for the Plutonium Packaging project, the Plutonium Recovery and Stabilization project, and the Uranium Recovery and Stabilization project. In addition, it reports on quality assurance activities for the Plutonium Packaging project.

Rink, N.A.; Aguino, V.T. [comps.

1997-02-01T23:59:59.000Z

287

Argonne National Laboratory-East site environmental report for calendar year 1995  

Science Conference Proceedings (OSTI)

This report presents the environmental report for the Argonne National Laboratory-East for the year of 1995. Topics discussed include: general description of the site including climatology, geology, seismicity, hydrology, vegetation, endangered species, population, water and land use, and archaeology; compliance summary; environmental program information; environmental nonradiological program information; ground water protection; and radiological monitoring program.

Golchert, N.W.; Kolzow, R.G. [Environmental Management Operation, Argonne National Lab., IL (United States)

1996-09-01T23:59:59.000Z

288

Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory - Calendar Year 1999 Emission Report  

Science Conference Proceedings (OSTI)

This report presents the 1999 calendar year update of the Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory (INEEL). The INEEL Air Emission Inventory documents sources and emissions of nonradionuclide pollutants from operations at the INEEL. The report describes the emission inventory process and all of the sources at the INEEL, and provides nonradionuclide emissions estimates for stationary sources.

Zohner, S.K.

2000-05-30T23:59:59.000Z

289

Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory - Calendar Year 1998 Emissions Report  

SciTech Connect

This report presents the 1998 calendar year update of the Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory (INEEL). The INEEL Air Emission Inventory documents sources and emissions of nonradionuclide pollutants from operations at the INEEL. The report describes the emission inventory process and all of the sources at the INEEL, and provides nonradiological emissions estimates for stationary sources.

S. K. Zohner

1999-10-01T23:59:59.000Z

290

Financial News for Independent Energy Companies  

U.S. Energy Information Administration (EIA)

Financial News for Independent Energy Companies, First Quarter 2010 1 FINANCIAL NEWS FOR ... reported a large increase in income in the first quarter of 2010 ...

291

The Voluntary Provision of Public Goods? The Turnpike Companies of Early America  

E-Print Network (OSTI)

reported that his On the company’s revenues would be aboutBV. Sec. ), Turnpike Company Minute entry July 8, 1811, NewReposession: The Turnpike Companies of Early America."

Klein, Daniel

1990-01-01T23:59:59.000Z

292

Iron Edison Battery Company | Open Energy Information  

Open Energy Info (EERE)

Iron Edison Battery Company Iron Edison Battery Company Jump to: navigation, search Logo: Iron Edison Battery Company Name Iron Edison Battery Company Place Lakewood, Colorado Sector Bioenergy, Carbon, Efficiency, Hydro, Renewable Energy, Solar, Wind energy Product Nickel Iron (Ni-Fe) battery systems Year founded 2011 Number of employees 1-10 Phone number 202-681-4766 Website http://ironedison.com Region Rockies Area References Iron Edison Battery Company[1] Nickel Iron Battery Specifications[2] About the company and the owners[3] Nickel Iron Battery Association[4] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Iron Edison Battery Company is a company based in Lakewood, Colorado. Iron Edison is redefining off-grid energy storage using advanced

293

Urban Network Practices: Pacific Gas and Electric Company  

Science Conference Proceedings (OSTI)

This report describes the findings of an underground distribution practices immersion conducted by the Electric Power Research Institute (EPRI) with the Pacific Gas and Electric Company (PG&E). This immersion was conducted as part of a multi-year effort by EPRI to identify noteworthy practices in managing urban network systems. More specifically, this report profiles the practices (people, processes, and technology) in place at PG&E, a San Francisco, California-based utility serving customers via seconda...

2011-07-20T23:59:59.000Z

294

Regional companies eye growth  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional companies eye growth Regional companies eye growth Adaptive Radio Technologies, Los Alamos Visualization Associates, Mesa Tech International Inc., and ThermaSun Inc. were...

295

3M Austin concentrating photovoltaic plant two-year performance report, 1992--1993. Final report  

DOE Green Energy (OSTI)

The U.S. Department of Energy, the state of Texas, 3M and the City of Austin Electric Utility jointly funded the installation of a nominal 300 kilowatt concentrating solar photovoltaic system above the parking garage of the new 3M facility in Austin. The plants operating performance for the years 1992-1993 are presented.

Hoffner, J. [Austin Municipal Electric Utility System, TX (United States); Jaster, P. [Minnesota Mining and Mfg. Co., Austin, TX (United States). Austin Center

1993-12-31T23:59:59.000Z

296

U.S. Department of Energy fiscal year 1997 annual report  

SciTech Connect

The Government Management Reform Act and the Government Performance and Results Act both have the objective of ensuring that Federal government agencies are accountable to American taxpayers. This report provides a clear accounting of the return on the investment entrusted to the Department of Energy. Unlike previous annual reports prepared by the Department, this report is fashioned along the lines of a corporate report to the shareholders. Not only does this report contain audited financial statements for the fiscal year but it also describes what the shareholders, American taxpayers, received in the way of services and contributions to the important National goals this Administration and the Department have promised to provide. This report provides a progress report on how the Department is serving the country and how they are doing it for much lower cost.

NONE

1998-02-01T23:59:59.000Z

297

Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008  

E-Print Network (OSTI)

Vine, 2006. “Energy service companies in European countries:of Energy Service Companies Report, December. Boardman,2010. “Energy Service Companies Market in Europe- Status

Goldman, Charles A.

2013-01-01T23:59:59.000Z

298

Kansas City Power and Light Company Smart Grid Host Site 2012 Progress Report: For the Period Ending December 2012  

Science Conference Proceedings (OSTI)

The Kansas City Power & Light Co. (KCP&L) Smart Grid Demonstration Project is a component of an Electric Power Research Institute (EPRI) multi-year collaborative initiative with utility participants. The project focuses on integrating distributed energy resources (DER)—such as demand response, storage, and distributed and renewable generation—into a virtual power plant. The ultimate goal is to advance widespread, efficient, and cost-effective deployment of utility and customer ...

2013-04-29T23:59:59.000Z

299

Semiannual Report to Congress: for the first half of Fiscal Year (FY) 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for the first half of Fiscal Year for the first half of Fiscal Year (FY) 1998 Semiannual Report to Congress: for the first half of Fiscal Year (FY) 1998 April 30, 1998 1998 Inspector General Semiannual Report to Congress During this reporting period, the Office of Inspector General continued to advise Headquarters and field managers of opportunities to improve the efficiency and effectiveness of the Department's management controls, with particular emphasis on coverage of issues addressed in the Department's Strategic Plan. We also have supported the Department's streamlining initiatives by evaluating the cost effectiveness and overall efficiency of Department programs and operations, placing special emphasis on key issue areas which have historically benefited from Office of Inspector General

300

Colonie Interim Storage Site annual site environmental report for calendar year 1989, Colonie, New York  

SciTech Connect

IN 1984, Congress assigned the cleanup of the National Lead (NL) Industries site in Colonie, New York, to the Department of Energy (DOE) as part of a decontamination research and development project under the 1984 Energy and Water Appropriations Act. DOE then included the site in the Formerly Utilized Sites Remedial Action Program (FUSRAP), an existing DOE program to decontaminate or otherwise control sites where residual radioactive materials remain for the early years of the nation's atomic energy program. DOE instituted an environmental monitoring program at the site in 1984. Results are presented annually in reports such as this. Under FUSRAP, the first environmental monitoring report for this site presented data for calendar year 1984. This report presents the findings of the environmental monitoring program conducted during calendar year 1989. 16 refs., 17 figs., 14 tabs.

1990-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Reimbursements to Licensees of Active Uranium and Thorium Processing Sites, Fiscal Year 2009 and 2010 Status Report  

Energy.gov (U.S. Department of Energy (DOE))

Reimbursements to Licensees of Active Uranium and Thorium Processing Sites, Fiscal Year 2009 and 2010 Status Report (March 2010)  

302

SOLERAS - Solar Energy Water Desalination Project: Chicago Bridge and Iron Company. System design final report, Volume 2. Appendix  

Science Conference Proceedings (OSTI)

Volume II of CBI's final report of work under Phase 1 of the desalination project, submitted in August 1981, is an appendix containing detailed equipment specifications and descriptions of all major subsystems of the proposed pilot desalination plant. Piping and instrumentation drawings, electrical power distribution diagrams, and building floor plans are also provided. The appendix includes technical specifications for all pumps, storage tanks, heat exchangers, the turbine and diesel generators, oil heater, melter assembly and counterwasher.

Not Available

1986-01-01T23:59:59.000Z

303

Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992  

SciTech Connect

In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

Not Available

1993-09-01T23:59:59.000Z

304

National Emission Standards for Hazardous Air Pollutants—Calendar Year 2011 INL Report for Radionuclides (2012)  

SciTech Connect

This report documents the calendar year 2011 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy's Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, 'Protection of the Environment,' Part 61, 'National Emission Standards for Hazardous Air Pollutants,' Subpart H, 'National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.' The effective dose equivalent to the maximally exposed individual member of the public was 4.58E-02 mrem per year, 0.46 percent of the 10 mrem standard.

Mark Verdoorn; Tom Haney

2012-06-01T23:59:59.000Z

305

Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0).

Elvado Environmental LLC

2009-12-01T23:59:59.000Z

306

Annual Site Environmental Report of the Lawrence Berkeley Laboratory, Calendar year 1992  

SciTech Connect

This Annual Site Environmental Report summarizes LBL environmental activities in calendar year (CY) 1992. The purpose of this Report is to present summary environmental information in order to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Its format and content are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program.``

Balgobin, D.A.; Javandel, I.; Pauer, R.O.; Schleimer, G.E.; Thorson, P.A. [eds.

1993-05-01T23:59:59.000Z

307

National Emission Standards for Hazardous Air Pollutants—Calendar Year 2010 INL Report for Radionuclides (2011)  

SciTech Connect

This report documents the calendar Year 2010 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy's Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, 'Protection of the Environment,' Part 61, 'National Emission Standards for Hazardous Air Pollutants,' Subpart H, 'National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.'

Mark Verdoorn; Tom Haney

2011-06-01T23:59:59.000Z

308

Pacific Gas and Electric Company's Notice of Intention to seek certification for Geysers Unit 17 (78-NOI-3). Final report  

DOE Green Energy (OSTI)

The final findings of fact and conclusions of the Commission Committee are presented. The proposed project is described. A summary of the proceedings to date, and local, state, and federal government agency and public comments on the Preliminary Report are included. Site related issues covered emphasized air quality. Other topics included: noise, water quality, hydrology and water resources, biological resources, socio-economic factors, and cultural resources. Public health and safety considerations include: hydrogen sulfide hazards; radionuclides; ammonia, ammonium compounds, and sulfates; mercury; arsenic; boron; sulfur dioxide; and total suspended particulates. Other findings include those on erosion and seismicity. (MHR)

Not Available

1978-12-01T23:59:59.000Z

309

Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6  

SciTech Connect

In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

NONE

1995-08-01T23:59:59.000Z

310

Bechtel Jacobs Company LLC Sampling and Analysis Plan for the Water Resources Restoration Program for Fiscal Year 2009, Oak Ridge Reservation, Oak Ridge, Tennessee  

SciTech Connect

The Oak Ridge Reservation (ORR) Water Resources Restoration Program (WRRP) was established by the U. S. Department of Energy (DOE) in 1996 to implement a consistent approach to long-term environmental monitoring across the ORR. The WRRP has four principal objectives: (1) to provide the data and technical analysis necessary to assess the performance of completed Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) actions on the ORR; (2) to perform monitoring to establish a baseline against which the performance of future actions will be gauged and to support watershed management decisions; (3) to perform interim-status and post-closure permit monitoring and reporting to comply with Resource Conservation and Recovery Act of 1976 (RCRA) requirements; and (4) to support ongoing waste management activities associated with WRRP activities. Water quality projects were established for each of the major facilities on the ORR: East Tennessee Technology Park (ETTP); Oak Ridge National Laboratory (ORNL), including Bethel Valley and Melton Valley; and the Y-12 National Security Complex (Y-12 Complex or Y-12), including Bear Creek Valley (BCV), Upper East Fork Poplar Creek (UEFPC), and Chestnut Ridge. Off-site (i.e., located beyond the ORR boundary) sampling requirements are also managed as part of the Y-12 Water Quality Project (YWQP). Offsite locations include those at Lower East Fork Poplar Creek (LEFPC), the Clinch River/Poplar Creek (CR/PC), and Lower Watts Bar Reservoir (LWBR). The Oak Ridge Associated Universities (ORAU) South Campus Facility (SCF) is also included as an 'off-site' location, although it is actually situated on property owned by DOE. The administrative watersheds are shown in Fig. A.l (Appendix A). The WRRP provides a central administrative and reporting function that integrates and coordinates the activities of the water quality projects, including preparation and administration of the WRRP Sampling and Analysis Plan (SAP). A brief summary is given of the organization of the SAP appendices, which provide the monitoring specifics and details of sampling and analytical requirements for each of the water quality programs on the ORR. Section 2 of this SAP provides a brief overview and monitoring strategy for the ETTP. Section 3 discusses monitoring strategy for Bethel Valley, and Melton Valley background information and monitoring strategy is provided in Section 4. BCV and UEFPC monitoring strategies are presented in Sect. 5 and 6, respectively. Section 7 provides background information and monitoring strategy for all off-site locations.

Ketelle R.H.

2008-09-25T23:59:59.000Z

311

U.S. Nuclear Regulatory Commission accountability report, fiscal year 1995. Volume 1  

SciTech Connect

The US Nuclear Regulatory Commission (NRC) is one of six Federal agencies participating in a pilot project to streamline financial management reporting. The goal of this pilot is to consolidate performance-related reporting into a single accountability report. The project, which is being carried out under the guidance of the Chief Financial Officers Council, was undertaken in accordance with the Government Management Reform Act (GMRA) of 1994. The GMRA permits the streamlining of financial management reports in consultation with the appropriate Congressional Committees through a liaison in the US Office of Management and Budget (OMB). The results of the pilot project will determine the method to be used for reporting financial management information for fiscal year (FY) 1996. This report consolidates the information previously reported in the following documents: (1) the NRC`s annual financial statement required by the Chief Financial Officers Act of 1990; (2) the Chairman`s annual report to the President and the Congress, required by the Federal Managers` Financial Integrity Act of 1982; (3) the Chairman`s semiannual report to the Congress on management decisions and final actions on Office of Inspector General audit recommendations, required by the Inspector General Act of 1978, as amended. This report also includes performance measures, as required by the Chief Financial Officers Act of 1990.

1996-05-01T23:59:59.000Z

312

Institute for Scientific Computing Research Annual Report for Fiscal Year 2003  

SciTech Connect

The University Relations Program (URP) encourages collaborative research between Lawrence Livermore National Laboratory (LLNL) and the University of California campuses. The Institute for Scientific Computing Research (ISCR) actively participates in such collaborative research, and this report details the Fiscal Year 2003 projects jointly served by URP and ISCR.

Keyes, D; McGraw, J

2004-02-12T23:59:59.000Z

313

"ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250  

U.S. Energy Information Administration (EIA) Indexed Site

CORPORATION","SURVEY","PERIOD","COMPANY_NAME","RDIST_LABEL","STATE_NAME","SITE","PADD","PRODUCT","SUPPLY","QUANTITY" CORPORATION","SURVEY","PERIOD","COMPANY_NAME","RDIST_LABEL","STATE_NAME","SITE","PADD","PRODUCT","SUPPLY","QUANTITY" "ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250 "ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per stream day)",15000

314

Performance Audit of the Department of Energy's Improper Payment Reporting in the Fiscal Year 2011 Agency Financial Report, OAS-FS-12-07  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Audit of the Performance Audit of the Department of Energy's Improper Payment Reporting in the Fiscal Year 2011 Agency Financial Report OAS-FS-12-07 March 2012 Department of Energy Washington, DC 20585 March 15, 2012 MEMORANDUM FOR THE SECRETARY for FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Report on "Performance Audit of the Department of Energy's Improper Payment Reporting in the Fiscal Year 2011 Agency Financial Report" The attached report presents the results of an evaluation of the Department of Energy's Improper Payment Reporting in the Fiscal Year 2011 Agency Financial Report (AFR). To fulfill the Office of Inspector General's audit responsibilities, we contracted with the independent public

315

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2MHILL • B& W West Valley, LLC

2011-09-28T23:59:59.000Z

316

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011  

Science Conference Proceedings (OSTI)

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

CH2M HILL • B& W West Valley, LLC

2012-09-27T23:59:59.000Z

317

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Rendall, John D. [CH2M HILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& W West Valley, LLC (CHBWV)

2013-09-19T23:59:59.000Z

318

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009  

SciTech Connect

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS Corporation

2010-09-17T23:59:59.000Z

319

Company Level Imports  

U.S. Energy Information Administration (EIA) Indexed Site

All Petroleum & Other Liquids Reports All Petroleum & Other Liquids Reports Company Level Imports With Data for September 2013 | Release Date: November 27, 2013 | Next Release Date: December 30, 2013 | XLS Previous Issues Month: September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 prior issues Go September 2013 Import Highlights Monthly data on the origins of crude oil imports in September 2013 has been released and it shows that two countries exported more than 1 million barrels per day to the United States (see table below). The top five exporting countries accounted for 75 percent of United States crude oil imports in September while the top ten sources accounted for approximately 92 percent of all U.S. crude oil imports. The top five sources of US crude

320

DOE/KEURP site operator program. Year 3, Second Quarter Report, October 1--December 31, 1993  

Science Conference Proceedings (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU has purchased several electric cars and proposes to purchase additional electric vehicles. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has procured two (2) Soleq 1993 Ford EVcort station wagons. During calendar year 1994, the Kansas` electric vehicle program expects to purchase a minimum of four and a maximum of eleven additional electric vehicles. The G-Van was signed in order for the public to be aware that it was an electric vehicle. Financial participants` names have been stenciled on the back door of the van. The Soleq EvCorts have not been signed. In order to demonstrate the technology as feasible, the EvCorts were deliberately not signed. The goal is to generate a public perception that this vehicle is no different from any similar internal combustion engine vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged.

Not Available

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Final Report of a CRADA Between Pacific Northwest National Laboratory and the General Motors Company (CRADA No. PNNL/271): “Degradation Mechanisms of Urea Selective Catalytic Reduction Technology”  

DOE Green Energy (OSTI)

Diesel engines can offer substantially higher fuel efficiency, good driving performance characteristics, and reduced carbon dioxide (CO2) emission compared to stoichiometric gasoline engines. Despite the increasing public demand for higher fuel economy and reduced dependency on imported oil, however, meeting the stringent emission standards with affordable methods has been a major challenge for the wide application of these fuel-efficient engines in the US market. The selective catalytic reduction of NOx by urea (urea-SCR) is one of the most promising technologies for NOx emission control for diesel engine exhausts. To ensure successful NOx emission control in the urea-SCR technology, both a diesel oxidation catalyst (DOC) and a urea-SCR catalyst with high activity and durability are critical for the emission control system. Because the use of this technology for light-duty diesel vehicle applications is new, the relative lack of experience makes it especially challenging to satisfy the durability requirements. Of particular concern is being able to realistically simulate actual field aging of the catalyst systems under laboratory conditions, which is necessary both as a rapid assessment tool for verifying improved performance and certifiability of new catalyst formulations. In addition, it is imperative to develop a good understanding of deactivation mechanisms to help develop improved catalyst materials. In this CRADA program, General Motors Company and PNNL have investigated fresh, laboratory- and vehicle-aged DOC and SCR catalysts. The studies have led to a better understanding of various aging factors that impact the long-term performance of catalysts used in the urea-SCR technology, and have improved the correlation between laboratory and vehicle aging for reduced development time and cost. This Final Report briefly highlights many of the technical accomplishments and documents the productivity of the program in terms of peer-reviewed scientific publications (2 total), reports (3 total including this Final Report), and presentations (5 total).

Kim, Do Heui; Lee, Jong H.; Peden, Charles HF; Howden, Ken; Kim, Chang H.; Oh, Se H.; Schmieg, Steven J.; Wiebenga, Michelle H.

2011-12-13T23:59:59.000Z

322

Summary of the Hanford Site Environmental Report for Calendar Year 2008  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2008." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2009-09-15T23:59:59.000Z

323

Summary of the Hanford Site Environmental Report for Calendar Year 2009  

Science Conference Proceedings (OSTI)

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2009." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2010-09-30T23:59:59.000Z

324

Summary of the Hanford Site Environmental Report for Calendar Year 2007  

SciTech Connect

This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2007." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

2008-09-10T23:59:59.000Z

325

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009  

SciTech Connect

This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

None

2010-10-01T23:59:59.000Z

326

Participating in the U.S. Department of Energy Revised "1605(b)" Program for the Voluntary Reporting of Greenhouse Gas Emissions: A Guide for U.S. Electric Companies  

Science Conference Proceedings (OSTI)

EPRI prepared this Technical Update report to provide staff of EPRI member electric companies and other interested parties a better understanding of the new requirements and methodologies embodied in the revised 1605(b) program guidelines and insight into some of the potential strategic benefits and risks associated with participating in the revised program in the future.

2007-11-29T23:59:59.000Z

327

Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2004  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), ''Notice of Intent and Emissions Inventory Requirements''. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. This Title V Operating Permit (Permit No. P-100) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2004. LANL's 2004 emissions are well below the emission limits in the Title V Operating Permit.

M. Stockton

2005-10-01T23:59:59.000Z

328

Emissions inventory report summary for Los Alamos National Laboratory for calendar year 2008  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory’s potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2008. LANL’s 2008 emissions are well below the emission limits in the Title V Operating Permit.

Ecology and Air Quality Group

2009-10-01T23:59:59.000Z

329

Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2009  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2009. LANL's 2009 emissions are well below the emission limits in the Title V Operating Permit.

Environmental Stewardship Group

2010-10-01T23:59:59.000Z

330

Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2006  

SciTech Connect

Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. Modification Number 1 to this Title V Operating Permit was issued on June 15, 2006 (Permit No P-100M1) and includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2006. LANL's 2006 emissions are well below the emission limits in the Title V Operating Permit.

Ecology and Air Quality Group

2007-09-28T23:59:59.000Z

331

United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

Not Available

1994-06-01T23:59:59.000Z

332

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2011-03-30T23:59:59.000Z

333

Test Reference Year (TRY). Final report. [Weather data collection for building energy demand calculations  

SciTech Connect

The Test Reference Year (TRY) for a specified location is a data collection consisting of 8760 sets of hourly weather data. Its main objective is to provide data for computerized calculations regarding energy conservation, energy consumption in buildings, and indoor climate. This report recommends a suitable format for such a TRY, describes which weather data are mandatory for such a TRY to meet the main objective, and recommends how it can be published. The report does not recommend any specific procedure for generating or selecting a TRY for a given location.

1977-08-01T23:59:59.000Z

334

Platts top 250 global energy company rankings  

SciTech Connect

Revenues and profits for many firms surged last year over previous years. The turnaround from last year's global survey is dramatic. Asset- and revenue-rich integrated oil and gas companies dominate the top rungs of the 2005 Platts Top 250 Global Energy Company Rankings. The following industry segments were analyzed: diversified utilities; exploration and production; electric utilities; gas utilities; integrated oil and gas companies; refining and marketing; independent power producers; coal and consumable fuel companies and storage and transfer companies; The total combined revenue for the coal and consumable fuels sector was $74.7 billion. Leaders in this sector were: Yanzhou Coal Mining Co., CONSOl Energy Inc., Peabody Energy Corp., PT Bumi Resources Tbk, Cameco Corp., and Arch Coal. 14 tabs.

Mullen, T.; Leonard, M.

2005-12-01T23:59:59.000Z

335

Company Level Imports Archives  

U.S. Energy Information Administration (EIA) Indexed Site

Company Level Imports Company Level Imports Archives 2013 Imports by Month January XLS February XLS March XLS April XLS May XLS June XLS July XLS August XLS September XLS...

336

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008  

SciTech Connect

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

West Valley Environmental Services LLC (WVES) and URS - Washington Division

2009-09-24T23:59:59.000Z

337

Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992  

SciTech Connect

This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.

Zaeh, R.A.

1993-04-01T23:59:59.000Z

338

Calendar Year 2011 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

SciTech Connect

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2011 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. This report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and known extent of groundwater contamination. The CY 2011 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by the DOE Environmental Management (EM) contractor responsible for environmental cleanup on the ORR. In August 2011, URS | CH2M Oak Ridge LLC (UCOR) replaced Bechtel Jacobs Company LLC (BJC) as the DOE EM contractor. For this report, BJC/UCOR will be referenced as the managing contractor for CY 2011. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC/UCOR (i.e., coordinating sample collection and sharing data) ensures that the CY 2011 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. This report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC/UCOR. Such details are deferred to the respective programmatic plans and reports issued by BJC. Collectively, the groundwater and surface water monitoring data obtained during CY 2011 by the Y-12 GWPP and BJC/UCOR address DOE Order 436.1 and DOE Order 458.1 requirements for monitoring groundwater and surface water quality in areas (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring) and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). This report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. This report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

Elvado Environmental LLC,

2012-12-01T23:59:59.000Z

339

Calendar Year 2007 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2007 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2007 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2007 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT), and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). In December 2007, the BWXT corporate name was changed to Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12), which is applied to personnel and organizations throughout CY 2007 for this report. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2007 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2007 by the Y-12 GWPP and BJC address DOE Order 450.1 (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater and surface water contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

Elvado Environmental LLC

2008-12-01T23:59:59.000Z

340

Calendar Year 2009 Groundwater Monitoring Report, U.S. Department of Energy, Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2009 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2009 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2009 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2009 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for the wells in each regime that were sampled during CY 2009 by either the Y-1

Elvado Environmental LLC

2010-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Southern Company Smart Grid Demonstration Host-Site Project Description  

Science Conference Proceedings (OSTI)

This report provides a description of the Southern Company Smart Grid Demonstration Host-Site Project as part of the Electric Power Research Institute's (EPRI's) multi-year smart grid demonstration initiative. The EPRI initiative includes core smart grid research and a number of large-scale smart grid projects currently with 18 funding utility members. The project is focused on integrating large-scale distributed energy resources (DER)including demand response, storage, distributed generation, and distri...

2010-07-27T23:59:59.000Z

342

Hawaiian Electric Company (HECO) Smart Grid (SG) Demonstration Project Description  

Science Conference Proceedings (OSTI)

This report describes one smart grid demonstration host-site project. The Hawaiian Electric Company (HECO) host site is part of the Electric Power Research Institute's (EPRI's) seven-year Smart Grid Demonstration Initiative. The project is focused on integrating large-scale distributed energy resources (DER), including demand response, storage, distributed generation, and distributed renewable generation, into a "virtual power plant" to advance the widespread, efficient, and cost-effective deployment of ...

2012-08-13T23:59:59.000Z

343

Application of wind power systems to the Service Area of the Minnesota Power and Light Company. Final report, July 1975--August 1976  

DOE Green Energy (OSTI)

Honeywell, in a joint effort with Minnesota Power and Light Company (MP and L), Boeing Vertol Company, and Dr. C.G. Justus, Georgia Institute of Technology, has conducted a regional application study of wind energy systems. Minnesota Power and Light Company, an investor-owned company with 853-MW owned capacity, has served as the case study subject utility. An initial system definition was developed based on available wind information and near-term wind turbine generator (WTG) technology. The system was tailored to fit MP and L's forecasted generation needs and the company's existing transmission and distribution system. Honeywell developed a WECS simulation to convert wind data to wind energy available for input to the utility's grid. The simulation was used to evaluate the performance of preliminary design wind turbine generators developed for ERDA/NASA by the General Electric Company and Kaman Aerospace Corporation, and to evaluate the performance of a wind turbine optimized for the Northern Minnesota wind regime and developed by the Boeing Vertol Company under subcontract to Honeywell.

Lindquist, O.H.; Malver, F.S.

1976-01-01T23:59:59.000Z

344

Evaluation of the typical meteorological years for solar heating and cooling system studies. Final report  

DOE Green Energy (OSTI)

This report is a summary of an evaluation of the weather data set, generated at Sandia Laboratories, known as the Typical Meteorological Year (TMY) Data. The purpose of the evaluation is to determine how well the TMY data represent actual long-term weather data in affecting the performance of solar heating and cooling systems. The two data sets are compared through detailed SHAC simulation.

Freeman, T. L.

1979-12-01T23:59:59.000Z

345

The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Report Environmental Report For Calendar Year 2002 U . S . D e p a r t m e n t o f E n e r g y * O f f i c e o f F o s s i l E n e r g y N a t i o n a l E n e r g y T e c h n o l o g y L a b o r a t o r y DOE/NETL-2004/1201 2 DOE/NETL-2004/1201 The National Energy Technology Laboratory Annual Site Environmental Report for Calendar Year 2002 October 2003 U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia Pittsburgh, Pennsylvania Tulsa, Oklahoma Fairbanks, Alaska NETL Customer Service Line: (800) 553-7681 NETL Homepage: www.netl.doe.gov 3 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or

346

Calendar Year 2010 Groundwater Monitoring Report, U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2010 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2010 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2010 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2010 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

Elvado Environmental LLC

2011-12-01T23:59:59.000Z

347

Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989  

Science Conference Proceedings (OSTI)

This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

Not Available

1989-01-01T23:59:59.000Z

348

Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders  

SciTech Connect

The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

NONE

1997-12-31T23:59:59.000Z

349

Financial News for Major Energy Companies  

Gasoline and Diesel Fuel Update (EIA)

Third Quarter 2005 Third Quarter 2005 The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one 1 major energy companies reported overall net income (excluding unusual items) of $26.0 billion on revenues of $295.1 billion during the third quarter of 2005 (Q305). The level of net income for Q305 was 69 percent higher than in the third quarter of 2004 (Q304) (Table 1). Net income for Q305 increased primarily as a result of higher crude oil and

350

Financial News for Major Energy Companies  

Gasoline and Diesel Fuel Update (EIA)

First Quarter 2006 First Quarter 2006 The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-one major energy companies 1 reported overall net income (excluding unusual items) of $24.1 billion on revenues of $276.6 billion during the first quarter of 2006 (Q106). The level of net income for Q106 was 23 percent higher than in the first quarter of 2005 (Q105) (Table 1). Net income for Q106 increased primarily as a result of higher crude oil and

351

Financial News for Major Energy Companies  

Gasoline and Diesel Fuel Update (EIA)

Second Quarter 2005 Second Quarter 2005 The "Financial News for Major Energy Companies" is issued quarterly to report recent trends in the financial performance of the major energy companies. These include the respondents to Form EIA-28 (Financial Reporting System (FRS)), with the exception of the FRS companies that do not issue quarterly earnings releases or fail to provide separate information for the company's U.S. operations. Twenty-five major energy companies reported overall net income (excluding unusual items) of $23.0 billion on revenues of $276.1 billion during the second quarter of 2005 (Q205). The level of net income for Q205 was 38 percent higher than in the second quarter of 2004 (Q204) (Table 1). Net income for Q205 increased primarily as a result of higher crude oil

352

Fuel Switching on a Dime -- Boiler Capabilities of Electric Utilities and Industrial Companies: EPRI Report Series on Gas Demands for Power Generation  

Science Conference Proceedings (OSTI)

Electric utilities play an unusual and important role in the natural gas market because so much of their ongoing gas demand is price sensitive. This report, which focuses on the pattern of this demand, tracks how switching between gas and alternative fuels by major users affects the overall market. Events over the past four years and new plant-specific data have changed our understanding of this phenomenon.

1994-01-01T23:59:59.000Z

353

Development of Energy Trading Floors - Implications for Company Operations and Regional Energy Markets: Report Series on Fuel and Po wer Market Integration  

Science Conference Proceedings (OSTI)

A variety of different firms have established energy trading floors over the past several years, to such an extent that trading floors are increasingly being viewed as a mandatory part of the generation business. Increasing in number and scope, trading floors are undergoing rapid evolution, with inevitable -- but as yet uncertain -- impacts on alignment of fuel and power prices. This report provides a snapshot of the development and implications of energy trading floors, drawing on leading examples from ...

1998-04-15T23:59:59.000Z

354

McKinsey & Company has set the standards of excellence in top management consulting for more than 80 years. We advise decision makers in leading companies, the public sector, non-profit organizations, and innovative, fast-growing start-ups around the glob  

E-Print Network (OSTI)

McKinsey & Company has set the standards of excellence in top management consulting for more than. As part of McKinsey's Basic Materials Practice, Metals & Mining is a global group of Consultants. To strengthen our team of experts in DĂĽsseldorf, we seek At McKinsey & Company, you will work on stimulating

Angermann, Lutz

355

GUIDANCE FOR AUDITORS OF SMALLER PUBLIC COMPANIES  

E-Print Network (OSTI)

This publication presents the views of the staff of the Public Company Accounting Oversight Board on how auditors can apply certain provisions of Auditing Standard No. 5 to audits of internal control over financial reporting of smaller, less complex public companies. The statements contained in this publication are not rules of the Board, nor have they

unknown authors

2009-01-01T23:59:59.000Z

356

Sixth Annual Report of the Texas Agricultural Experiment Station for the Year 1893.  

E-Print Network (OSTI)

Report of the Director - Report of the Chemist - Report of the Veterinarian - Report of the Horticulturist - Report of the Meteorologist -Financial statement - Index

Connell, J. H.; Harrington, H. H.; Francis, M.; Price, R. H.; Adriance, Duncan

1893-01-01T23:59:59.000Z

357

Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational  

SciTech Connect

This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

NONE

1995-05-01T23:59:59.000Z

358

Ocean Energy Company LLC | Open Energy Information  

Open Energy Info (EERE)

Ocean Energy Company LLC Address 505 Fifth Ave 800 Place Des Moines Zip 50309-2426 Sector Marine and Hydrokinetic Year founded 2011 Phone number (515) 246-1500 Region United States...

359

Chief Energy Company LLC | Open Energy Information  

Open Energy Info (EERE)

LLC Place Sioux City, Iowa Product Developer of 108m gallon (409.3m litres) per year corn-to-ethanol plant in Sioux City. References Chief Energy Company LLC1 LinkedIn...

360

Environmental Education and Development Division (EM-522). Annual report, Fiscal year 1993  

Science Conference Proceedings (OSTI)

The Environmental Education and Development Division (EM-522) is one of three divisions within the Office of Technology Integration and Environmental Education and Development (EM-52) in Environmental Restoration and Waste Management`s (EM`s) Office of Technology Development (EM-50). The primary design criterion for EM-522 education activities is directly related to meeting EM`s goal of environmental compliance on an accelerated basis and cleanup of the 1989 inventory of inactive sites and facilities by the year 2019. Therefore, EM-522`s efforts are directed specifically toward stimulating knowledge and capabilities to achieve the goals of EM while contributing to DOE`s overall goal of increasing scientific, mathematical, and technical literacy and competency. This report discusses fiscal year 1993 activities.

Not Available

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Divison of Environmental Education and Development Fiscal Year 1992 annual report  

SciTech Connect

Primary design criterion for this division`s education activities is directly related to meeting the goal of environmental compliance on an accelerated basis and cleanup of the 1989 inventory of inactive sites and facilities by the year 2019. Therefore, the division`s efforts are directed toward stimulating knowledge and capability to achieve the goals while contributing to DOE`s overall goal of increasing scientific, mathematical, and technical literacy and competency. This annual report is divided into: overview, workforce development, academic partnerships, scholarships/fellowships, environmental restoration and waste management employment program, community colleges, outreach, evaluation, and principal DOE contacts.

Not Available

1992-12-31T23:59:59.000Z

362

Buried waste integrated demonstration fiscal year 1992 close-out report  

SciTech Connect

The mission of the Buried Waste Integrated Demonstration Program (BWID) is to support the development and demonstration of a suite of technologies that when integrated with commercially-available baseline technologies form a comprehensive remediation system for the effective and efficient remediation of buried waste disposed of throughout the US Department of Energy complex. To accomplish this mission of identifying technological solutions for remediation deficiencies, the Office of Technology Development initiated the BWID at the Idaho National Engineering Laboratory in fiscal year (FY)-91. This report summarizes the activities of the BWID Program during FY-92.

Cannon, P.G.; Kostelnik, K.M.; Owens, K.J.

1993-02-01T23:59:59.000Z

363

Calendar Year 2001 Annual Site Environmental Report Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

Sandia Corporation (a subsidiary of Lockheed Martin Corporation through its contract with the U.S. Department of Energy [DOE]), National Nuclear Security Administration (NNSA) operates the Tonopah Test Range (TTR) in Nevada. Westinghouse Government Service, TTR's operations and maintenance contractor, performs most all environmental program functions. This Annual Site Environmental Report (ASER), which is published to inform the public about environmental conditions at TTR, describes environmental protection programs and summarizes the compliance status with major environmental laws and regulations during Calendar Year (CY) 2001.

VIGIL, FRANCINE S.

2002-09-01T23:59:59.000Z

364

Hanford Double-Shell Tank Inspection Annual Report Calendar Year 2012  

SciTech Connect

The double-shell tanks (DSTs) were constructed between 1968 and 1986. They will have exceeded their design life before the waste can be removed and trasferred to the Waste Treatment and Immobilization Plant for vitrification. The Double-Shell Tank Integrity Project has been established to evaluate tank aging, and ensure that each tank is structurally sound for continued use. This is the first issue of the Double-Shell Tank Inspection Annual Report. The purpose of this issue is to summarize the results of DST inspections conducted from the beginnng of the inspection program through the end of CY2012. Hereafter, the report will be updated annually with summaries of the past year's DST inspection activities.

Petermann, Tasha M.; Boomer, Kayle D.; Washenfelder, D. J.

2013-12-02T23:59:59.000Z

365

Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project  

Science Conference Proceedings (OSTI)

This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

NONE

1996-10-01T23:59:59.000Z

366

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008  

SciTech Connect

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: #2; CAU 400: Bomblet Pit and Five Points Landfill (TTR) #2; CAU 404: Roller Coaster Lagoons and Trench (TTR) #2; CAU 407: Roller Coaster RadSafe Area (TTR) #2; CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) #2; CAU 424: Area 3 Landfill Complexes (TTR) #2; CAU 426: Cactus Spring Waste Trenches (TTR) #2; CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) #2; CAU 453: Area 9 UXO Landfill (TTR) #2; CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) #2; CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2009-03-19T23:59:59.000Z

367

Semiannual Report to Congress: for the first half of Fiscal Year (FY) 1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 1998 , 1998 The Honorable Federico Peña Secretary U.S. Department of Energy Washington, D.C. 20585 Dear Secretary Peña: This Semiannual Report to Congress for the first half of Fiscal Year (FY) 1998 is submitted by the Office of Inspector General for transmittal to the Congress, pursuant to the provisions of the Inspector General Act of 1978. During this reporting period, the Office of Inspector General continued to advise Headquarters and field managers of opportunities to improve the efficiency and effectiveness of the Depart- ment's management controls, with particular emphasis on coverage of issues addressed in the De- partment's Strategic Plan. We also have supported the Department's streamlining initiatives by evaluating the cost effectiveness and overall efficiency of Department programs and operations,

368

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010  

SciTech Connect

This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

None

2011-03-01T23:59:59.000Z

369

Electric and hybrid vehicles program. 5th annual report to Congress for Fiscal Year 1981  

Science Conference Proceedings (OSTI)

This fifth annual report on the implementation of the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976 (Public Law 94-413, as amended by Public Law 95-238, referred to as the Act) complies with the reporting requirements established in Section 14 of the Act. In addition to informing the Congress of the progress and plans of the Department of Energy Electric and Hybrid Vehicles Program, this report is intended to serve as a communication link between the Department and all of the public and private interests involved in making the program a success. The Annual Report represents the major summary of the Electric and Hybrid Vehicles Program activities; since July 1981, DOE has ceased publication of the EHV Quarterly Reports with Congressional approval. The fourth quarter activities for FY 1981 are included in this report. During FY 1981, significant progress was made toward implementing the policies established by Congress in the Act. There has been a noticeable increase in interest shown by both the automobile manufacturing and the supply sectors of our economy in electric and hybrid vehicles. This year, the emphasis in the Electric and Hybrid Vehicles Program shifted from vehicle demonstration and preparation for production readiness to research, development, test, and evaluation of advanced technologies to achieve the attributes necessary to make electric and hybrid vehicles a practical transportation alternative. Research and development efforts in batteries and propulsion components, as well as total vehicle systems, continue to reveal significant progress toward providing industry with technology options that will result in vehicles with greater public acceptance.

None

1982-03-01T23:59:59.000Z

370

The Idaho National Engineering Laboratory Site environmental report for calendar year 1992  

Science Conference Proceedings (OSTI)

The results of the various monitoring programs for 1992 indicate that most radioactivity from the INEL operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEL Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and Federal health protection guidelines. The first section of the report summarizes INEL activities related to compliance with environmental regulations and laws for Calendar Year 1992 and January 1 through April 1, 1993. The major portion of the report summarizes results of the RESL environmental surveillance program, which includes the collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations, offsite boundary, and distant locations. The report also compares and evaluates the sample results to appropriate Federal regulations and standards and discusses implications, if any. The USGS ground-water monitoring program is briefly summarized, and data from USGS reports are included in maps showing the spread of contaminants. Effluent monitoring and nonradiological drinking water monitoring performed by INEL contractors are discussed briefly, and data are summarized in tables.

Hoff, D.L.; Mitchell, R.G.; Moore, R.; Bingham, L.

1993-06-01T23:59:59.000Z

371

Pacific Northwest and Alaska Regional Bioenergy Program : Five Year Report, 1985-1990.  

DOE Green Energy (OSTI)

This five-year report describes activities of the Pacific Northwest and Alaska Regional Bioenergy Program between 1985 and 1990. Begun in 1979, this Regional Bioenergy Program became the model for the nation's four other regional bioenergy programs in 1983. Within the time span of this report, the Pacific Northwest and Alaska Regional Bioenergy Program has undertaken a number of applied research and technology projects, and supported and guided the work of its five participating state energy programs. During this period, the Regional Bioenergy Program has brought together public- and private-sector organizations to promote the use of local biomass and municipal-waste energy resources and technologies. This report claims information on the mission, goals and accomplishments of the Regional Bioenergy Program. It describes the biomass projects conducted by the individual states of the region, and summarizes the results of the programs technical studies. Publications from both the state and regional projects are listed. The report goes on to consider future efforts of the Regional Bioenergy Program under its challenging assignment. Research activities include: forest residue estimates; Landsat biomass mapping; woody biomass plantations; industrial wood-fuel market; residential space heating with wood; materials recovery of residues; co-firing wood chips with coal; biomass fuel characterization; wood-boosted geothermal power plants; wood gasification; municipal solid wastes to energy; woodstove study; slash burning; forest depletion; and technology transfer. 9 figs., 6 tabs.

Pacific Northwest and Alaska Bioenergy Program (U.S.)

1991-02-01T23:59:59.000Z

372

Pacific Northwest and Alaska Regional Bioenergy Program : Five Year Report, 1985-1990.  

SciTech Connect

This five-year report describes activities of the Pacific Northwest and Alaska Regional Bioenergy Program between 1985 and 1990. Begun in 1979, this Regional Bioenergy Program became the model for the nation's four other regional bioenergy programs in 1983. Within the time span of this report, the Pacific Northwest and Alaska Regional Bioenergy Program has undertaken a number of applied research and technology projects, and supported and guided the work of its five participating state energy programs. During this period, the Regional Bioenergy Program has brought together public- and private-sector organizations to promote the use of local biomass and municipal-waste energy resources and technologies. This report claims information on the mission, goals and accomplishments of the Regional Bioenergy Program. It describes the biomass projects conducted by the individual states of the region, and summarizes the results of the programs technical studies. Publications from both the state and regional projects are listed. The report goes on to consider future efforts of the Regional Bioenergy Program under its challenging assignment. Research activities include: forest residue estimates; Landsat biomass mapping; woody biomass plantations; industrial wood-fuel market; residential space heating with wood; materials recovery of residues; co-firing wood chips with coal; biomass fuel characterization; wood-boosted geothermal power plants; wood gasification; municipal solid wastes to energy; woodstove study; slash burning; forest depletion; and technology transfer. 9 figs., 6 tabs.

Pacific Northwest and Alaska Bioenergy Program (U.S.)

1991-02-01T23:59:59.000Z

373

Ecological Monitoring and Compliance Program Fiscal Year 2002 Report (Part Two of Two)  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.

C. A. Wills

2002-12-01T23:59:59.000Z

374

Health hazard evaluation report No. HHE-80-233-793, Davis Bessie Nuclear Power Station, Toledo Edison Company, United Engineers and Contractors Company (UE and C), Oak Harbor, Ohio  

Science Conference Proceedings (OSTI)

Personal air samples were analyzed and employees were given medical evaluations at Davis Bessie Nuclear Power Station (SIC-4911) in Oak Harbor, Ohio. Requests for evaluation were made by a union representative of the United Engineers and Contractors and a union representative of employees of Toledo Edison Company, working on site at the power station, to evaluate employee skin and scalp problems due to exposure to ceramic wood fibers. Preliminary surveys were conducted on September 24 and 25, 1980 and a follow-up survey was performed on October 16, 1980. Environmental evaluation consisted of gravimetric analyses of personal air samples for airborne ceramic wool fibers. A total of 400 production and maintenance workers and varying numbers of construction workers were exposed to the fibers during installation of insulation which was completed at the time of the survey. The three personal air samples showed no accumulation of particulates and fibers detected were nonrespirable. Medical evaluations were conducted in 52 workers and scalp scrapings were obtained from 43 workers. Thirty seven workers had histories suggestive of irritant dermatitis of the scalp; 24 workers had physical findings consistent with the diagnosis. Of the 43 scalp samples, 18 were contaminated with organisms of the gut, perineum, skin or respiratory tract. Dermatitis was directly related to the history of dust exposure. The authors conclude that a potential health hazard exists for employees from exposure to ceramic wool fiber. Recommendations include provision of handwashing facilities and protective clothing for employees, and installation of an impermeable covering for the ceramic wool fiber.

Cone, J.; Hartle, R.

1981-01-01T23:59:59.000Z

375

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

Peurrung, L.M.

1999-06-30T23:59:59.000Z

376

Arrow Lakes Reservoir Fertilization Experiment; Years 4 and 5, Technical Report 2002-2003.  

DOE Green Energy (OSTI)

This report presents the fourth and fifth year (2002 and 2003, respectively) of a five-year fertilization experiment on the Arrow Lakes Reservoir. The goal of the experiment was to increase kokanee populations impacted from hydroelectric development on the Arrow Lakes Reservoir. The impacts resulted in declining stocks of kokanee, a native land-locked sockeye salmon (Oncorhynchus nerka), a key species of the ecosystem. Arrow Lakes Reservoir, located in southeastern British Columbia, has undergone experimental fertilization since 1999. It is modeled after the successful Kootenay Lake fertilization experiment. The amount of fertilizer added in 2002 and 2003 was similar to the previous three years. Phosphorus loading from fertilizer was 52.8 metric tons and nitrogen loading from fertilizer was 268 metric tons. As in previous years, fertilizer additions occurred between the end of April and the beginning of September. Surface temperatures were generally warmer in 2003 than in 2002 in the Arrow Lakes Reservoir from May to September. Local tributary flows to Arrow Lakes Reservoir in 2002 and 2003 were generally less than average, however not as low as had occurred in 2001. Water chemistry parameters in select rivers and streams were similar to previous years results, except for dissolved inorganic nitrogen (DIN) concentrations which were significantly less in 2001, 2002 and 2003. The reduced snow pack in 2001 and 2003 would explain the lower concentrations of DIN. The natural load of DIN to the Arrow system ranged from 7200 tonnes in 1997 to 4500 tonnes in 2003; these results coincide with the decrease in DIN measurements from water samples taken in the reservoir during this period. Water chemistry parameters in the reservoir were similar to previous years of study except for a few exceptions. Seasonal averages of total phosphorus ranged from 2.11 to 7.42 {micro}g/L from 1997 through 2003 in the entire reservoir which were indicative of oligo-mesotrophic conditions. Dissolved inorganic nitrogen concentrations have decreased in 2002 and 2003 compared to previous years. These results indicate that the surface waters in Arrow Lakes Reservoir were approaching nitrogen limitation. Results from the 2003 discrete profile series indicate nitrate concentrations decreased significantly below 25 {micro}g/L (which is the concentration where nitrate is considered limiting to phytoplankton) between June and July at stations in Upper Arrow and Lower Arrow. Nitrogen to phosphorus ratios (weight:weight) were also low during these months indicating that the surface waters were nitrogen deficient. These results indicated that the nitrogen to phosphorus blends of fertilizer added to the reservoir need to be fine tuned and closely monitored on a weekly basis in future years of nutrient addition. Phytoplankton results shifted during 2002 and 2003 compared to previous years. During 2002, there was a co-dominance of potentially 'inedible' diatoms (Fragilaria spp. and Diatoma) and 'greens' (Ulothrix). Large diatom populations occurred in 2003 and these results indicate it may be necessary to alter the frequency and amounts of weekly loads of nitrogen and phosphorus in future years to prevent the growth of inedible diatoms. Zooplankton density in 2002 and 2003, as in previous years, indicated higher densities in Lower Arrow than in Upper Arrow. Copepods and other Cladocera (mainly tiny specimens such as Bosmina sp.) had distinct peaks, higher than in previous years, while Daphnia was not present in higher numbers particularly in Upper Arrow. This density shift in favor to smaller cladocerans was mirrored in a weak biomass increase. In Upper Arrow, total zooplankton biomass decreased from 1999 to 2002, and in 2003 increased slightly, while in Lower Arrow the biomass decreased from 2000-2002. In Lower Arrow the majority of biomass was comprised of Daphnia throughout the study period except in 2002, while in Upper Arrow the total biomass was comprised of copepods from 2000-2003.

Schindler, E.

2007-02-01T23:59:59.000Z

377

Calendar Year 2005 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2005 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2005 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2005 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2005 monitoring data is deferred to the ''Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium'' (BWXT 2006). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and distinguishing sampling characteristics; (3) an evaluation of hydrologic characteristics, based on pre-sampling groundwater elevations, along with a compilation of available test results (e.g., hydraulic conductivity test data); (4) a discussion of geochemical characteristics based on evaluation of the analytical results for the primary anions and cations; and (5) a detailed analysis and interpretation of the available data for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. The following sections of this report provide details regarding the CY 2005 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regime. Section 2 briefly describes the hydrogeologic system and generalized extent of groundwater contamination in each regime. Section 3 describes the monitoring programs implemented and associated sampling activities performed in each regime during CY 2005. Section 4 presents an a summary of the CY 2005 monitoring data with regard to the provisions of DOE Order 450.1 (surveillance and exit pathway/perimeter monitoring), including highlights of notable findings and time-series plots of data for CY 2005 sampling locations that provide representative examples of long-term contaminant concentration trends. Brief conclusions and proposed recommendations are provided in Section 5. Section 6 lists the documents cited for more detailed operational, regulatory, and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Monitoring well construction details are in Appendix C. Results of field measurements and laboratory analyses of the groundwater and surface water samples collected during CY 2005 are in Appendix D (Bear Creek Regime), Appendix E (East Fork Regime and surrounding areas), and Appendix F (Chestnut Ridge Regime). Appendix G co

None

2006-09-01T23:59:59.000Z

378

Calendar Year 2004 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2004 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2004 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2004 monitoring data is deferred to the Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium (BWXT 2005). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and distinguishing sampling characteristics; (3) an evaluation of hydrologic characteristics, based on pre-sampling groundwater elevations, along with a compilation of available test results (e.g., hydraulic conductivity test data); (4) a discussion of geochemical characteristics based on evaluation of the analytical results for the primary anions and cations; and (5) a detailed analysis and interpretation of the available data for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. The following sections of this report provide details regarding the CY 2004 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regime. Section 2 briefly describes the hydrogeologic system and generalized extent of groundwater contamination in each regime. Section 3 describes the monitoring programs implemented and associated sampling activities performed in each regime during CY 2004. Section 4 presents an a summary of the CY 2004 monitoring data with regard to the provisions of DOE Order 450.1 (surveillance and exit pathway/perimeter monitoring), including highlights of notable findings and time-series plots of data for CY 2004 sampling locations that provide representative examples of long-term contaminant concentration trends. Brief conclusions and proposed recommendations are provided in Section 5. Section 6 lists the documents cited for more detailed operational, regulatory, and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Monitoring well construction details are in Appendix C. Results of field measurements and laboratory analyses of the groundwater and surface water samples collected during CY 2004 are in Appendix D (Bear Creek Regime), Appendix E (East Fork Regime and surrounding areas), and Appendix F (Chestnut Ridge Regime). Appendix G contai

N /A

2005-09-01T23:59:59.000Z

379

Hot dry rock energy: Hot dry rock geothermal development program. Progress report. Fiscal year 1993  

DOE Green Energy (OSTI)

Extended flow testing at the Fenton Hill Hot Dry Rock (HDR) test facility concluded in Fiscal Year 1993 with the completion of Phase 2 of the long-term flow test (LTFT) program. As is reported in detail in this report, the second phase of the LTFT, although only 55 days in duration, confirmed in every way the encouraging test results of the 112-day Phase I LTFT carried out in Fiscal Year 1992. Interim flow testing was conducted early in FY 1993 during the period between the two LTFT segments. In addition, two brief tests involving operation of the reservoir on a cyclic schedule were run at the end of the Phase 2 LTFT. These interim and cyclic tests provided an opportunity to conduct evaluations and field demonstrations of several reservoir engineering concepts that can now be applied to significantly increase the productivity of HDR systems. The Fenton Hill HDR test facility was shut down and brought into standby status during the last part of FY 1993. Unfortunately, the world`s largest, deepest, and most productive HDR reservoir has gone essentially unused since that time.

Salazar, J.; Brown, M. [eds.

1995-03-01T23:59:59.000Z

380

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

SciTech Connect

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

Science Conference Proceedings (OSTI)

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

382

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002  

Science Conference Proceedings (OSTI)

This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

R. B. Jackson

2003-08-01T23:59:59.000Z

383

Waste Treatment Plant Support Program: Summaries of Reports Produced During Fiscal Years 1999-2010  

Science Conference Proceedings (OSTI)

The Waste Treatment Plant (WTP) being built on the U.S. Department of Energy (DOE) Hanford Site will be the largest chemical processing plant in the United States. Bechtel National Inc. (BNI) is the designer and constructor for the WTP. The Pacific Northwest National Laboratory (PNNL) has provided significant research and testing support to the WTP. This report provides a summary of reports developed initially under PNNL’s “1831” use agreement and later PNNL’s “1830” prime contract with DOE in support of the WTP. In March 2001, PNNL under its “1831” use agreement entered into a contract with BNI to support their research and testing activities. However, PNNL support to the WTP predates BNI involvement. Prior to March 2001, PNNL supported British Nuclear Fuels Ltd. in its role as overall designer and constructor. In February 2007, execution of PNNL’s support to the WTP was moved under its “1830” prime contract with DOE. Documents numbered “PNWD-XXXX” were issued under PNNL’s “1831” use agreement. Documents numbered “PNNL-XXXX” were issued under PNNL’s “1830” prime contract with DOE. The documents are sorted by fiscal year and categorized as follows: ? Characterization ? HLW (High Level Waste) ? Material Characterization ? Pretreatment ? Simulant Development ? Vitrification ? Waste Form Qualification. This report is intended to provide a compendium of reports issued by PNWD/PNNL in support of the Waste Treatment Plant. Copies of all reports can be obtained by clicking on http://www.pnl.gov/rpp-wtp/ and downloading the .pdf file(s) to your computer.

Beeman, Gordon H.

2010-08-12T23:59:59.000Z

384

Impact of Higher Natural Gas Prices on Local Distribution Companies and Residential Customers  

Reports and Publications (EIA)

This report examines some of the problems faced by natural gas consumers as a result of increasing heating bills in recent years and problems associated with larger amounts of uncollectible revenue and lower throughput for the local distribution companies (LDCs) supplying the natural gas.

Lejla Alic

2007-08-15T23:59:59.000Z

385

Argonne National Laboratory summary site environmental report for calendar year 2007.  

Science Conference Proceedings (OSTI)

This summary of Argonne National Laboratory's Site Environmental Report for calendar year 2007 was written by 20 students at Downers Grove South High School in Downers Grove, Ill. The student authors are classmates in Mr. Howard's Bio II course. Biology II is a research-based class that teaches students the process of research by showing them how the sciences apply to daily life. For the past seven years, Argonne has worked with Biology II students to create a short document summarizing the Site Environmental Report to provide the public with an easy-to-read summary of the annual 300-page technical report on the results of Argonne's on-site environmental monitoring program. The summary is made available online and given to visitors to Argonne, researchers interested in collaborating with Argonne, future employees, and many others. In addition to providing Argonne and the public with an easily understandable short summary of a large technical document, the participating students learn about professional environmental monitoring procedures, achieve a better understanding of the time and effort put forth into summarizing and publishing research, and gain confidence in their own abilities to express themselves in writing. The Argonne Summary Site Environmental Report fits into the educational needs for 12th grade students. Illinois State Educational Goal 12 states that a student should understand the fundamental concepts, principles, and interconnections of the life, physical, and earth/space sciences. To create this summary booklet, the students had to read and understand the larger technical report, which discusses in-depth many activities and programs that have been established by Argonne to maintain a safe local environment. Creating this Summary Site Environmental Report also helps students fulfill Illinois State Learning Standard 12B5a, which requires that students be able to analyze and explain biodiversity issues, and the causes and effects of extinction. The same standard requires that Illinois students examine the impact of diminishing biodiversity due to human activity. An example of this would be the Argonne Restoration Prairie, which is discussed within the report. Because humans had to destroy part of a natural prairie in order to build, they must also plant an equivalent amount of prairie to make up for what was destroyed. The summary project perfectly meets Illinois State Learning Standard 13B section 5b, which requires students to be able to design and conduct an environmental impact study, analyze findings, and justify recommendations. Students volunteered for the project for two main reasons: We would become published authors, and could include that fact on important documents, like college applications, and we felt we were doing a good deed for the public, considering that without our summary the public may have no real idea how Argonne complies with various environmental protection acts and programs within the state. The summarization process was not easy, considering that we had never seen much of this kind of information before, especially in such detail. The project required a high level of commitment from all involved. This commitment ensured that the summary would be done on time and would be available to the public in the shortest time possible. Argonne representatives Norbert Golchert and Dave Baurac met with students and gave background information on Argonne and explained the importance of the research being done. In addition, they explained in-depth how the public benefits from the summarization. At the end of the presentation, students asked some questions, which were answered in specifics. The Report was divided into 10 sections, with groups of two students covering each section. The groups were eager to begin work on their assigned sections. After reading the complete report each group focused on a particular section. After much careful reading and analysis, we produced an outline. From the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited,

Golchert, N. W.

2009-05-22T23:59:59.000Z

386

Lockheed Martin Energy Systems, Inc., Groundwater Program Office. Annual report for fiscal year 1994  

Science Conference Proceedings (OSTI)

This edition of the Lockheed Martin Energy Systems, Inc., (Energy Systems) Groundwater Program Annual Report summarizes the work carried out by the Energy Systems Groundwater Program Office (GWPO) for fiscal year (FY) 1994. The GWPO is responsible for coordination and oversight for all components of the groundwater programs at the three Oak Ridge facilities [Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants (PGDP and PORTS, respectively.) This report describes the administrative framework of the GWPO including staffing, organization, and funding sources. In addition, summaries are provided of activities involving the Technical Support staff at the five facilities. Finally, the results of basic investigations designed to improve our understanding of the major processes governing groundwater flow and contaminant migration on the Oak Ridge Reservation (ORR) are reported. These investigations are conducted as part of the Oak Ridge Reservation Hydrology and Geology Studies (ORRHAGS) program. The relevance of these studies to the overall remediation responsibilities of Energy Systems is discussed.

NONE

1994-09-30T23:59:59.000Z

387

Geotechnical support and topical studies for nuclear waste geologic repositories: Annual report, fiscal year 1987  

Science Conference Proceedings (OSTI)

This multidisciplinary project was initiated in fiscal year 1986. It comprises 11 reports in two major interrelated tasks: The technical assistance part of the project includes reviewing the progress of the major projects in the DOE Office of Civilian Radioactive waste Management (OCRWM) Program and advising the Engineering and Geotechnology Division on significant technical issues facing each project; analyzing geotechnical data, reports, tests, surveys and plans for the different projects; reviewing and commenting on major technical reports and other program documents such as Site Characterization Plans (SCP) and Study Plans; and providing scientific and technical input at technical meetings. The topical studies activity comprises studies on scientific and technical ions and issues of significance to in-situ testing, test analysis methods, and site characterization of nuclear waste geologic repositories. The subjects of study were selected based on discussions with DOE staff. One minor topic is a preliminary consideration and planning exercise for postclosure monitoring studies. The major task, with subtasks involving various geoscience disciplines, is a study of the mechanical, hydraulic, geophysical and geochemical properties of fractures in geologic rock masses.

Not Available

1988-01-01T23:59:59.000Z

388

National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota  

Science Conference Proceedings (OSTI)

A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

2008-02-01T23:59:59.000Z

389

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1996  

SciTech Connect

The results of the 1996 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the US Department of Energy and the public with information on the level of radioactive and nonradioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1996, PPPL's Tokamak Fusion Test Reactor (TFTR) continued to conduct fusion experiments. Having set a world record on November 2, 1994, by achieving approximately 10.7 million watts of controlled fusion power during the deuterium-tritium (D-T) plasma experiments, researchers turned their attention to studying plasma science experiments, which included ''enhanced reverse shear techniques.'' Since November 1993, more than 700 tritium-fueled experiments were conducted, which generated more than 4 x 10(superscript 20) neutrons and 1.4 gigajoules of fusion energy. In 1996, the overall performance of Princeton Plasma Physics Laboratory was rated ''excellent'' by the US Department of Energy in the Laboratory Appraisal report issued in early 1997. The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents) and petroleum hydrocarbons (past leaks of releases of diesel fuel from underground storage tanks). Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report. During 1996, PPPL completed the removal of contaminated soil from two locations that were identified through the monitoring program: petroleum hydrocarbons along a drainage swale and chromium adjacent to the cooling tower.

J.D. Levine; V.L. Finley

1998-03-01T23:59:59.000Z

390

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011  

SciTech Connect

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

NSTec Environmental Restoration

2012-02-21T23:59:59.000Z

391

Prepared by Eastman Chemical Company  

E-Print Network (OSTI)

Products Liquid Phase Conversion Company, L.P., nor any of their subcontractors nor the U.S. Department of Energy, nor any person acting on behalf of either: (A) Makes any warranty or representation, express or implied, with respect to the accuracy, completeness, or usefulness of the information contained in this report, or that the use of any information, apparatus, method, or process disclosed in this report may not infringe privately owned rights; or (B) Assumes any liabilities with respect to the use of, or for damages resulting from the use of, any information, apparatus, method, or process disclosed in this report. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute its endorsement, recommendation, or favoring by the U.S. Department of Energy. The views and opinions of authors expressed herein does not necessarily state or reflect those of the U.S. Department of Energy. The Liquid Phase Methanol (LPMEOH™) Demonstration Project at Kingsport, Tennessee, is a $213.7 million cooperative agreement between the U.S. Department of Energy (DOE) and Air Products Liquid Phase Conversion Company, L.P. (the Partnership) to produce methanol from coal-derived synthesis gas (syngas). Air Products and Chemicals, Inc. (Air Products) and Eastman Chemical Company (Eastman) formed the Partnership to execute the Demonstration

For The

2003-01-01T23:59:59.000Z

392

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2001  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants (if any) that are added to the environment as a result of the Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2001 environmental surveillance and monitoring program for PPPL are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2001. PPPL has engaged in fusion energy research since 1951. The vision of the Laboratory is to create innovations to make fusion power a practical reality--a clean, alternative energy source. The Year 2001 marked the third year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. In 2001, PPPL's radiological environmental monitoring program measured tritium in the air at on- and off-site sampling stations. PPPL is capable of detecting small changes in the ambient levels of tritium by using highly sensitive monitors. The operation of an in-stack monitor located on D-site is a requirement of the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations; also included in PPPL's radiological environmental monitoring program, are water monitoring--precipitation, ground-, surface-, and waste-waters. PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the D-site stack; the data are presented in this report. Groundwater monitoring continue d under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of nonradiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the low levels of volatile organic compounds in an area adjacent to PPPL. In 2001, PPPL was in compliance with its permit limits for surface and sanitary discharges and had no reportable releases. Additionally, as part of DOE's program for the purchase of recycled content and other environmentally preferred products, PPPL has ranked in the excellent category of 80 to 90% of the goal.

Virginia L. Finley

2004-04-07T23:59:59.000Z

393

Improved InGaN epitaxy yield by precise temperature measurement :yearly report 1.  

SciTech Connect

This Report summarizes the first year progress (October 1, 2004 to September 30, 2005) made under a NETL funded project entitled ''Improved InGaN Epitaxy Yield by Precise Temperature Measurement''. This Project addresses the production of efficient green LEDs, which are currently the least efficient of the primary colors. The Project Goals are to advance IR and UV-violet pyrometry to include real time corrections for surface emissivity on multiwafer MOCVD reactors. Increasing wafer yield would dramatically reduce high brightness LED costs and accelerate the commercial manufacture of inexpensive white light LEDs with very high color quality. This work draws upon and extends our previous research (funded by DOE) that developed emissivity correcting pyrometers (ECP) based on the high-temperature GaN opacity near 400 nm (the ultraviolet-violet range, or UVV), and the sapphire opacity in the mid-IR (MIR) near 7.5 microns.

Koleske, Daniel David; Creighton, James Randall; Russell, Michael J.; Fischer, Arthur Joseph

2006-08-01T23:59:59.000Z

394

Remote characterization of mixed waste by infrared spectroscopy: Fiscal year 1995 report  

Science Conference Proceedings (OSTI)

This report summarizes development work completed in FY 1995 on near-infrared (NIR) and Fourier Transform Infrared (FTIR) spectroscopy of determining the moisture content and solid species present in Hanford Site high-level waste. In prior fiscal years, the main emphasis was on identification of cyanide species that might be present in the ferrocyanide waste tanks, but the present thrust has been more focused on determining the moisture content of the waste. If sufficient moisture is present in the waste, propagating reactions in reactive waste are precluded, regardless of its fuel content. A prototype hot cell NIR moisture probe is now ready for hot cell deployment to sense moisture contents and homogeneity in tank waste samples

Rebagay, T.V.; Reich, F.R.; Dodd, D.A.; Lopez, T.; Watts, J.K.; Cash, R.J.

1995-09-01T23:59:59.000Z

395

Northeast Regional Biomass Energy Program. Quarterly report, 9th year, January--March 1992  

DOE Green Energy (OSTI)

The Northeast Regional Biomass Program (NRBP) is entering its ninth year of operation. The management and the objectives have virtually remained unchanged and are stated as follows. The program conducted by NRBP has three basic features: (1) a state grant component that provides funds (with a 50 percent matching requirement) to each of the states in the region to strengthen and integrate the work of state agencies involved in biomass energy; (2) a series of technical reports and studies in areas that have been identified as being of critical importance to the development of biomass energy in the region; and (3) a continuous long range planning component with heavy private sector involvement that helps to identify activities necessary to spur greater development and use of biomass energy in the Northeast.

O`Connell, R.A.

1992-04-01T23:59:59.000Z

396

Environmental Science and Research Foundation annual technical report: Calendar year 1996  

SciTech Connect

This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The authors conduct an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provide environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research in the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. The major accomplishments of the Foundation and its University Affiliates during the calendar year 1996 are discussed.

Morris, R.C.; Blew, R.D. [eds.

1997-07-01T23:59:59.000Z

397

Northeast Regional Biomass Energy Program. Progress report, 9th year, October--December 1991  

DOE Green Energy (OSTI)

The Northeast Regional Biomass Program (NRBP) is entering its ninth year of operation. The management and the objectives have virtually remained unchanged and are stated as follows. The program conducted by NRBP has three basic features: (1) a state grant component that provides funds (with a 50 percent matching requirement) to each of the states in the region to strengthen and integrate the work of state agencies involved in biomass energy; (2) a series of technical reports and studies in areas that have been identified as being of critical importance to the development of biomass energy in the region; and (3) a continuous long range planning component with heavy private sector involvement that helps to identify activities necessary to spur greater development and use of biomass energy in the Northeast.

O`Connell, R.A.

1992-02-01T23:59:59.000Z

398

Experimental and Numerical Investigations of Soil Desiccation for Vadose Zone Remediation: Report for Fiscal Year 2007  

SciTech Connect

Apart from source excavation, the options available for the remediation of vadose zone metal and radionuclide contaminants beyond the practical excavation depth (0 to 15 m) are quite limited. Of the available technologies, very few are applicable to the deep vadose zone with the top-ranked candidate being soil desiccation. An expert panel review of the work on infiltration control and supplemental technologies identified a number of knowledge gaps that would need to be overcome before soil desiccation could be deployed. The report documents some of the research conducted in the last year to fill these knowledge gaps. This work included 1) performing intermediate-scale laboratory flow cell experiments to demonstrate the desiccation process, 2) implementing a scalable version of Subsurface Transport Over Multiple Phases–Water-Air-Energy (STOMP-WAE), and 3) performing numerical experiments to identify the factors controlling the performance of a desiccation system.

Ward, Andy L.; Oostrom, Mart; Bacon, Diana H.

2008-02-04T23:59:59.000Z

399

Contract 98, Appendix F self-assessment report for Fiscal Year 2003  

E-Print Network (OSTI)

below thresholds to be an ORPS reportable occurrence. ) TheUnplanned Radiation Exposures: ORPS reportable occurrencesthe occurrence reporting system (ORPS). Unplanned Radiation

Albert Editor, Rich

2003-01-01T23:59:59.000Z

400

Augmented Fish Health Monitoring for Washington Department of Wildlife; Five-year Project Report, 1986-1991 Final Report.  

DOE Green Energy (OSTI)

The Augmented Fish Health Monitoring Project was funded by the Bonneville Power Administration (BPA) with the mandate to collect fish health data on the anadromous fish stocks of the Columbia River Basin in a standardized manner. The Washington Department of Wildlife began the project in 1986. Cumulative data and a final summary for this project are presented in this document. Fish stocks were examined monthly for length, weight, and health status at all Washington Department of Wildlife Columbia River Basin hatcheries. Assays for specific fish pathogens were conducted on all stocks of broodfish and smolts in the study area. Pathogens of interest were replicating viral agents, erythrocytic inclusion body syndrome virus (EIBSV), and Renibacterium salmoninarum. Sea-run cutthroat (SCT) were also sampled midway through the rearing cycle for R. salmoninarum. Juvenile fish were examined for the presence of any pathogen. Assays for Myxobolus cerebralis were conducted on fish stocks in several locations along the Columbia River. An organosomatic index analysis was made on each stock of smolts at the Cowlitz and Wells hatcheries. Results of the organosomatic index analysis were consistent between the years at each facility. However, the fish reared at Cowlitz displayed tissue changes associated with ceratomyxosis while those reared at Wells had a more desirable color and quality. Cell culture assays for viral agents in broodfish were positive for infectious hematopoeitic necrosis virus (IHNV) in all stocks at the Cowlitz Hatchery four out of five years in the study. Other stations were less consistent over the years. Only the sea-run cutthroat stock spawned at Beaver Creek was negative for any virus. Infectious pancreatic necrosis virus (IPNV) was isolated from summer-run steelhead (SS) broodfish at Wells in 1989 and 1991 and at Yakima in 1991. Inclusions that are characteristic of EIBSV were found in red blood cells of brood fish from the Wells Hatchery in 1990 and 1991. Data collected on EIBSV during the first two years of the project cannot be compared with the later three years due to changes in laboratory protocol. Isolations of IHNV in smolts were made from Cowlitz and Skamania hatcheries and the Gobar Rearing Pond. Epizootics of IHN occurred at Lyons Ferry, Beaver Creek, Cowlitz and Skamania hatcheries during the project, EIBSV inclusions were identified in very low levels from smolts from Beaver Creek, Chelan, Cowlitz, Eastbank, and Ringold. Assays for R. salmoninarum on broodfish and smolts revealed very low levels of infection and the disease was not a problem. Enteric redmouth disease was not observed in the project area. Cytophaga psychrophila was a chronic problem in young fish at Vancouver, Beaver Creek and Cowlitz hatcheries. Ceratomyxa Shasta was the only reportable parasite observed in the fish within the study area and caused yearly outbreaks of ceratomyxosis at the Cowlitz Hatchery. Fish at the Beaver Creek Hatchery were treated for furunculosis three of the five years of the project. An ozone water treatment plant has been installed to minimize the disease. Flow and density indexes and feed conversion did not vary significantly at the hatcheries during this project. Egg mortality averaged 12.94% throughout the project with a range from 4.39% to 29.10%. The mean fry mortality during the project was 15.08% with a range of 2.01 to 37.43%. The overall mortality for early rearing was 20.43%. Prespawning broodstock mortality was recorded for SS and SCT and averaged 5.18% with a range from 0 to 38.8%. Fungal invasion was the primary cause of death in adult fish. Epizootics of furunculosis, ceratomyxosis, bacterial coldwater disease, and IHN occurred during the project. Fewer cases were reported in more recent years. The BPA augmented fish health project helped WDW identify problem areas in fish health while they were occurring. This knowledge allowed us to develop strategies for improved fish quality. Overall the project has been invaluable in assisting us in the improvement of the health of our fish.

Kerwin, John; Roberts, Steve; Oman, Leni; Bolding, Bruce

1992-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting year company" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Campbell Soup Company: Harmonizing Processes and Empowering Workers  

E-Print Network (OSTI)

In 2007 Campbell Soup Company was implementing Project Harmony: a multi-year effort to implement SAP and create more standardized and integrated business processes across

Ross, Jeanne W.

2008-06-01T23:59:59.000Z

402

Inventory management in a pharmaceutical company : minimizing discard practices.  

E-Print Network (OSTI)

??Pharmaceutical company SPM has over 400 cases of inventory discards over the past five years which constitute a significant operating cost. Due to the complexity… (more)

Wang, Xiaojun, M. Eng. Massachusetts Institute of Technology

2010-01-01T23:59:59.000Z

403

Hydrogen-engine performance-analysis project. Second quarterly report first year of program  

DOE Green Energy (OSTI)

The objective of this research effort is to obtain the design data-base covering performance, operational characteristics and emissions essential for making a rational decision regarding the selection and design of prototype hydrogen-fueled, air-breathing engines capable of being manufactured for general automotive use. To this end hydrogen-fueled internal combustion engines were divided into fourteen subgroups. An engine representative of each subgroup will be tested during the course of the three year program. The Project Program Plan calls for investigation of pre-intake valve closing fuel ingestion (Pre IVC) hydrogen-fueled engines during the first two years. Work accomplished during the second three months of the project is reported. Activities during the second quarter concentrated on: final apparatus debugging, engine break-in, preliminary testing to determine qualitative apparatus operating characteristics, rearranging of the proposal test schedule and performing of tests with engine 1 (carbureted, throttled, no H/sub 2/O injection, no EGR and engine 4 (carbureted, unthrottled, no H/sub 2/O injection, no EGR. The details of these activities are described.

Adt, R.R. Jr.; Swain, M.R.; Pappas, J.M.

1977-06-01T23:59:59.000Z

404

DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

NONE

1995-12-01T23:59:59.000Z

405

Waste Isolation Pilot Plant site environmental report, for calendar year 1995  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires DOE facilities, that conduct environmental protection programs, to annually prepare a Site Environmental Report (SER). The purpose of the SER is to provide an abstract of environmental assessments conducted in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit. The content of this SER is not restricted to a synopsis of the required data, in addition, information pertaining to new and continued monitoring and compliance activities during the 1995 calendar year are also included. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP). The EMP provides inclusive guidelines implemented to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater. air, soil, and biotic matrices are monitored for an array of radiological and nonradiological factors. The baseline radiological surveillance program encompasses a broader geographic area that includes nearby ranches, villages, and cities. Most elements of nonradiological assessments are conducted within the geographic vicinity of the WIPP site.

NONE

1996-09-01T23:59:59.000Z

406

Calendar Year 2004 annual site environmental report : Tonopah Test Range, Nevada & Kauai Test Facility, Hawaii.  

Science Conference Proceedings (OSTI)

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2004. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004b).

Montoya, Amber L.; Wagner, Katrina; Goering, Teresa Lynn; Koss, Susan I.; Salinas, Stephanie A.

2005-09-01T23:59:59.000Z

407

Waste Isolation Pilot Plant site environmental report for calendar year 1994  

SciTech Connect

US Department of Energy (DOE) Order 5400.1 General Environmental Protection Program, requires each DOE facility that conducts significant environmental protection programs to prepare an Annual Site Environmental Report (ASER). The purpose of the ASER is to summarize environmental data in order to characterize site environmental management performance, to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts. This ASER not only documents the required data, it also documents new and continued monitoring and compliance activities during the 1994 calendar year. Data contained in this report are derived from those monitoring programs directed by the Waste Isolation Pilot Plant (WIPP) Environmental Monitoring Plan (EMP) (DOE/WIPP 94-024). The EMP defines a comprehensive set of parameters that must be monitored to detect potential impacts to the environment and to establish baseline measurements for future environmental evaluations. Surface water, groundwater, air, soil, and biotics are monitored for radiological and nonradiological activity levels. The baseline radiological surveillance program covers the broader geographic area that encompasses nearby ranches, villages, and cities. Nonradiological studies focus on the area immediately surrounding the WIPP site.

NONE

1995-06-01T23:59:59.000Z

408

Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report  

Science Conference Proceedings (OSTI)

The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Act (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.

Crowson, D.; Gibson, J.D.; Haase, C.S.; Holt, R.; Hyndman, D.; Krumhansl, J.; Lauffer, F.; McCord, J.P.; McCord, J.T.; Neel, D. [and others

1993-10-01T23:59:59.000Z

409

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1999  

Science Conference Proceedings (OSTI)

The results of the 1999 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of PPPL's operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 1999. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to create innovations to make fusion power a practical reality--an alternative energy source. 1999 marked the first year of National Spherical Torus Experiment (NSTX) operations and Tokamak Fusion Test Reactor (TFTR) dismantlement and deconstruction activities. A collaboration among fourteen national laboratories, universities, and research institutions, the NSTX is a major element in the U.S. Fusion Energy Sciences Program. It has been designed to test the physics principles of spherical torus (ST) plasmas. The ST concept could play an important role in the development of smaller, more economical fusion reactors. With its completion within budget and ahead of its target schedule, NSTX first plasma occurred on February 12, 1999. The 1999 performance of the Princeton Plasma Physics Laboratory was rated ''outstanding'' by the U.S. Department of Energy in the Laboratory Appraisal report issued early in 2000. The report cited the Laboratory's consistently excellent scientific and technological achievements, its successful management practices, and included high marks in a host of other areas including environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored for the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an area adjacent to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Virginia Finley

2001-04-20T23:59:59.000Z

410

Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report  

SciTech Connect

Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

NONE

1998-05-01T23:59:59.000Z

411

Princeton Plasma Physics Laboratory (PPPL) annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for CY93. The report is prepared to provide the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, added to the environment as a result of PPPL operations, as well as environmental initiatives, assessments, and programs that were undertaken in 1993. The objective of the Annual Site Environmental Report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health. The Princeton Plasma Physics Laboratory has engaged in fusion energy research since 1951. The long-range goal of the U.S. Magnetic Fusion Energy Research Program is to develop and demonstrate the practical application of fusion power as an alternate energy source. In 1993, PPPL had both of its two large tokamak devices in operati