Sample records for reporting year company

  1. Westinghouse Hanford Company effluent report for 300, 400, and 1100 Area operations for calendar year 1989

    SciTech Connect (OSTI)

    McCarthy, M.J.

    1990-09-01T23:59:59.000Z

    The report tabulates both radioactive and nonradioactive liquid and airborne effluent data for 300, 400, and 1100 Area operations at the Hanford Site. The 300 Area is primarily a research and development area. The 400 Area houses the Fast Flux Test Facility. The 1100 Area contains central stores and vehicle maintenance facilities. Releases to the environment from Westinghouse Hanford Company operations within these areas during calendar year 1989 were both consistent with previous years and within regulatory limits. 2 refs., 10 tabs.

  2. Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne

    SciTech Connect (OSTI)

    None

    2000-09-01T23:59:59.000Z

    OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

  3. Site Environmental Report for Calendar Year 2003 DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect (OSTI)

    Liu, Ning; Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2004-09-30T23:59:59.000Z

    This Annual Site Environmental Report (ASER) for 2003 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing Rocketdyne’s Santa Susana Field Laboratory (SSFL). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2003 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  4. Westinghouse Hanford Company effluent discharges and solid waste management report for calendar year 1989: 200/600 Areas

    SciTech Connect (OSTI)

    Brown, M.J.; P'Pool, R.K.; Thomas, S.P.

    1990-05-01T23:59:59.000Z

    This report presents calendar year 1989 radiological and nonradiological effluent discharge data from facilities in the 200 Areas and the 600 Area of the Hanford Site. Both summary and detailed effluent data are presented. In addition, radioactive and nonradioactive solid waste storage and disposal data for calendar year 1989 are furnished. Where appropriate, comparisons to previous years are made. The intent of the report is to demonstrate compliance of Westinghouse Hanford Company-operated facilities with administrative control values for radioactive constituents and applicable guidelines and standards (including Federal permit limits) for nonradioactive constituents. 11 refs., 20 tabs.

  5. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    3 05-27-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW STAKEHOLDER MEETING 3 PETROLEUM TRANSMISSION, STORAGE AND DISTRIBUTION ISSUES...

  6. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENERGY POLICY AND SYSTEMS ANALYSIS QUADRENNIAL ENERGY REVIEW STAKEHOLDER...

  7. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATE OF AMERICA DEPARTMENT OF ENERGY ---: : IN RE: : : QUADRENNIAL ENERGY REVIEW : : NEW...

  8. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    SciTech Connect (OSTI)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01T23:59:59.000Z

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  9. Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995

    SciTech Connect (OSTI)

    Schmidt, J.W., Westinghouse Hanford

    1996-07-30T23:59:59.000Z

    This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  10. Capital Reporting Company Quadrennial ...

    Energy Savers [EERE]

    11-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 10: Infrastructure Constraints Monday, August 11, 2014 New Mexico State...

  11. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    07-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 6 MONDAY, JULY 21, 2014 HELD AT: RASHID AUDITORIUM-HILLMAN CENTER...

  12. Capital Reporting Company Quadrenntial ...

    Broader source: Energy.gov (indexed) [DOE]

    Quadrenntial Energy Review 04-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 NEW ENGLAND REGIONAL INFRASTRUCTURE CONSTRAINTS A Public Meeting on the Quadrennial...

  13. Westinghouse Hanford Company Health and Safety Performance Report. First quarter calendar year 1995

    SciTech Connect (OSTI)

    Lansing, K.A.

    1995-05-01T23:59:59.000Z

    During the first quarter of CY 1995, four of the WHC sitewide ALARA performance goals were completed on or ahead of schedule. One of the completed goals related to reduction of radiological areas at WHC-managed facilities. Due to anticipated resource reductions and increased scope of work, several facilities escalated their reduction schedule. This allowed the ALARA goal to be completed and exceeded ahead of schedule. Industrial Safety and Health initiatives are being pursued in areas such as workplace ergonomics, safety training, and standards development. Positive efforts are ongoing in the areas of management commitment and employee involvement through the WHC Voluntary Protection Program. Successful implementation continues through the President`s Accident Prevention Council (PAPC) and division employee Accident Prevention Councils. The Company now has established CY 1995 PAPC goals. Major programmatic accomplishments completed during this reporting period include the Department of Energy-Headquarters (DOE-HQ) formally endorsing the Radiological Control organization`s approach toward development of the Radiation Protection Program (RPP) document. The DOE-HQ has recognized the significant contributions and leadership that Radiological Control has provided in planning and implementation of this ``model example of an RPP`` across the DOE complex and is encouraging other sites to contact WHC for assistance in developing their RPPs.

  14. Westinghouse Hanford Company health and safety performance report. Third quarter calendar year 1995

    SciTech Connect (OSTI)

    Lansing, K.A.

    1995-11-01T23:59:59.000Z

    The lost/restricted workday severity rate posted in CY 1994 of 45.50 was a significant improvement over the prior years and, remarkably, this rate has been reduced to 16.40 thus far in CY 1995 (Table 2--2). The indications from this sustained reduction are that employee, management, HEHF, and accident investigator efforts to manage injuries are becoming stronger (page 2--8). Congratulations to the Human Resources Department for working over 835,000 hours without a lost workday away injury/illness! The last lost workday away case occurred on 12/17/92. The Workers Compensation Report shows significant reduction in the amount of money expended for medical treatments and time loss due to industrial injuries. The cost of insurance continues to decrease. Continued savings can be attributed to aggressive claims and safety case management, an enhanced attitude by management creating a positive and proactive safety awareness culture, and a more aggressive return-to-work philosophy.

  15. Westinghouse Hanford Company ALARA year-end report, Calendar Year 1994: Revision 3A, Radiological engineering and ALARA

    SciTech Connect (OSTI)

    Berglund, O.D.

    1995-06-01T23:59:59.000Z

    It has long been the US Department of Energy`s (DOE`s) Policy that radiation doses should be maintained as far below the dose limits as is reasonably achievable. This policy, known as the ``ALARA Principle of radiation protection,`` maintains that radiation exposures should be maintained as low as reasonably achievable, taking into account social, technical, economic, practical, and public policy considerations. The ALARA Principle is based on the hypothesis that even very low radiation doses carry some risk. As a result, it is not enough to maintain doses at/or slightly below limits; the lower the doses, the lower the risks. Because it is not possible to reduce all doses at DOE facilities to zero, economic and social factors must be considered to determine the optimal level of radiation doses. According to the ALARA Principle, if doses are too high, resources should be well spent to reduce them. At some point, the resources being spent to maintain low doses are exactly balanced by the risks avoided. Reducing doses below this point results in a misallocation of resources; the resources could be spent elsewhere and have a greater positive impact on health and safety. The objective of the Westinghouse Hanford Company (WHC) ALARA/Contamination Control Improvement Project (CCIP) Program is to manage and control exposures (both individual and collective) to the work force, the general public, and the environment to levels as low as is reasonable using the aforementioned ALARA Principle.

  16. Site Environmental Report for Calendar Year 2007. DOE Operations at The Boeing Company, Santa Susana Field Laboratory, Area IV

    SciTech Connect (OSTI)

    none,

    2008-09-30T23:59:59.000Z

    This Annual Site Environmental Report (ASER) for 2007 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing’s Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. In May 2007, the D&D operations in Area IV were suspended until DOE completes the SSFL Area IV Environmental Impact Statement (EIS). The environmental monitoring programs were continued throughout the year. Results of the radiological monitoring program for the calendar year 2007 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste disposal. No liquid radioactive wastes were released into the environment in 2007.

  17. Westinghouse Hanford Company health and safety performance report, First quarter calendar year 1994

    SciTech Connect (OSTI)

    Lansing, K.A.

    1994-05-01T23:59:59.000Z

    Safety training programs for the employee, manager, and safety observer are undergoing refinements in response to employee suggestions as well as to promote the interactions necessary to the success of the Voluntary Protection Program. Adjustments to these programs are described on pages 2-1 and 2-2. Significant events, which carry lessons we must learn in order to reduce injury potential, are summarized on pages 2-2 and 2-3. The events highlighted this quarter involve indoor air quality and unexpected weather changes which can impact outdoor work activities. Our analysis of injuries occurring this reporting period continues to feature the simple-task injuries which reflect on awareness levels and culture strength. In addition to injuries arising from simple, everyday tasks, a significant number of injuries were caused by objects in ``blind spots``. These are items placed out of view where an employee can contact them by reaching in to a drawer (staples, exacto blades, etc.), or by bumping/brushing against (wall hangings, sharp furniture edges).

  18. Site environmental report for calendar year 2002. DOE operations at the Boeing Company, Rocketdyne Propulsion and Power

    SciTech Connect (OSTI)

    none,

    2003-09-30T23:59:59.000Z

    This Annual Site Environmental Report (ASER) for 2002 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing' s Santa Susana Field Laboratory (SSFL)). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development , fabrication , and disassembly of nuclear reactors , reactor fuel, and other radioactive materials . Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988, and, subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites . Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2002 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL . All potential exposure pathways are sampled and/or monitored , including air , soil, surface water, groundwater , direct radiation , transfer of property ( land, structures, waste), and recycling. All radioactive w astes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste disposal . No liquid radioactive wastes are released into the environment, and no structural debris from buildings w as transferred to municipal landfills or recycled in 2002.

  19. Company Company Code Fiscal Year Submission Date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting theCommercialization and Innovation2010 2010 EIA-28 Financial Reporting

  20. Pennsylvania company prepares year-end review

    SciTech Connect (OSTI)

    Not Available

    1990-04-12T23:59:59.000Z

    Equitable Resources, Inc., in Pittsburgh, Pennsylvania, reports that consolidated income for calendar year 1989 was $50.9 million, or $2.43 per share, up from 1988's $47.1 million, or $2.27 per share. The difference was primarily due to a general increase in retail rates which became effective in January 1989 for distribution customers in the state. A December 1989 settlement of a pipeline subsidiary's rate increase also added to the increase. The rate increase had been in effect since 1986, but the full effect had been reserved pending the outcome of regulatory proceedings, the company stated.

  1. Intern experience at URS Company: an internship report

    E-Print Network [OSTI]

    Elkarmi, Fawwaz, 1950-

    2013-03-13T23:59:59.000Z

    This report describes the author's internship experience with URS Company - Dallas, Texas, from May 1980 to May 1981. The internship company is a consulting engineering firm engaged in providing professional services...

  2. New Energy Dept., Berkeley Lab Report on Energy Service Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lawrence Berkeley National Laboratory today released a new report on the market size, trends and growth projections for America's energy service company (ESCO)...

  3. Interim activities report. [Westinghouse Savannah River Company

    SciTech Connect (OSTI)

    Majzlik, E.H. Jr.

    1992-01-01T23:59:59.000Z

    Several developments have occurred since the 32nd WANTO Meeting that effect the status of the Savannah River Site. A request to restart K-Reactor was issued after nearly three years of intensive engineering analysis, procedure revisions and enhanced operator training to upgrade all aspects of reactor operation. In early December 1991, the Westinghouse Savannah River Company requested permission from DOE to start the K-Reactor. In mid-December the DOE and the Defense Nuclear Facility Safety Board concurred with readiness to operate and a Federal Circuit Court of Appeals ruled against a lawsuit to delay restart until a cooling tower is completed. The K-Reactor was restarted and has been in an evaluation and testing mode. Full power operation at thirty percent of maximum capacity is projected for March 1992 after which actual tritium generation will begin. Operation will continue until October when the cooling tower will be tied into the reactor cooling system. In conjunction with the restart of K-Reactor, the P-Reactor has been placed in permanent shutdown status and the L-Reactor has been placed in warm stand-by. In another reactor related situation, the DOE will delay the decision on construction of the New Production Reactor (NPR) until 1993. The choice of reactor type and location of the NPR will be integrated into the overall programmatic decision on Reconfiguration of the Weapons Complex. Finally, construction of the Replacement Tritium Facility (RTF) was resumed in December 1991 after several months stoppage for evaluation and revision of project funding procedures.

  4. Final Year Project Report

    SciTech Connect (OSTI)

    Hubsch, Tristan [Howard University

    2013-06-20T23:59:59.000Z

    In the last years of this eighteen-year grant project, the research efforts have focused mostly on the study of off-shell representations of supersymmetry, both on the worldline and on the world- sheet, i.e., both in supersymmetric quantum mechanics and in supersymmetric field theory in 1+1-dimensional spacetime.

  5. Year in Review Annual Report

    E-Print Network [OSTI]

    Machery, Edouard

    Year in Review 2005-06 Annual Report Center for Latin American Studies University Center for International Studies University of Pittsburgh #12;2005-06 Year in Review 2 Message from the Acting Director

  6. Year in Review Annual Report

    E-Print Network [OSTI]

    Machery, Edouard

    Year in Review 2004-05 Annual Report Center for Latin American Studies University Center for International Studies University of Pittsburgh #12;2004-05 Year in Review 2 Message from the Director This has

  7. Year in Review Annual Report

    E-Print Network [OSTI]

    Machery, Edouard

    Year in Review 2006-07 Annual Report Center for Latin American Studies University Center for International Studies University of Pittsburgh #12;2006-07 Year in Review 2 Message from the Director Academic

  8. Accountability report - fiscal year 1997

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    This document contains the US NRC`s accountability report for fiscal year 1997. Topics include uses of funds, financial condition, program performance, management accountability, and the audited financial statement.

  9. Getting along with reporters, environmentalists, and regulators: How to get your company`s message on the air

    SciTech Connect (OSTI)

    Pearson, A. [Mitchell Energy & Development Corp., Woodlands, TX (United States)

    1994-12-31T23:59:59.000Z

    Oil and gas companies continue to get clobbered with expensive and punishing environmental regulations and drilling bans because they have done a poor job of convincing the public, the press, and the government that their operating practices are environmentally safe. The oil industry also continues to be perceived of as arrogant and secretive, which only aggravates its problems. Smart operators must learn to balance profitable development with earth-friendliness. They also must learn to tell their story more effectively and openly, not just through big trade groups like the API and IPAA, but as individual small businessmen working to improve the economies and job bases of their local communities. That means being more forthcoming with next-door neighbors and environmental groups, befriending local and national reporters who cover their companies, and fine-tuning messages and communications skills. Companies also can improve their images and, ideally, lighten their regulatory burdens by thinking of creative, win-win solutions to environmental problems their projects create. One company, for example, solved the problem of where to dump offshore channel dredging waste by creating a new island off South Texas with a carefully planted habitat that last year attracted a pair of endangered whooping cranes. State regulators loved it, it cost very little, and the press coverage was extremely positive.

  10. Getting along with reporters, environmentalists, and regulators: how to get your company`s message on the air

    SciTech Connect (OSTI)

    Pearson, A. [Mitchell Energy & Development Corp., Woodlands, TX (United States)

    1994-09-01T23:59:59.000Z

    Oil and gas companies continue to get clobbered with expensive and punishing environmental regulations and drilling bans because they have done a poor job of convincing the public, the press, and the government that their operating practices are environmentally safe. The oil industry also continues to be perceived as arrogant and secretive, which only aggravates its problems. Smart operators must learn to balance profitable development with earth-friendliness. They also must learn to tell their story more effectively and openly, not just through big trade groups like the API and IPAA, but as individual small businessmen working to improve the economies and job bases of their local communities. That means being more forthcoming with next-door neighbors and environmental groups, befriending local and national reporters who cover their companies, and fine-tuning messages and communications skills. Companies also can improve their image and hopefully lighten their regulatory burden by thinking up creative, win-win solutions to environmental problems their projects create. One company solved the problem of where to dump offshore channel dredging waste, for example, by creating a new island off south Texas with a carefully planted habitat that last year attracted a pair of endangered whooping cranes. State regulators loved it, it cost very little, and the press coverage was extremely positive.

  11. UoS Motor Accident Report Form COMPANY DETAILS

    E-Print Network [OSTI]

    Sussex, University of

    UNIV01FL02 UoS Motor Accident Report Form COMPANY DETAILS INSURED: University of Sussex ADDRESS: LOCATION: DESCRIPTION OF HOW ACCIDENT HAPPENED: PLEASE DRAW A SKETCH OF THE ACCIDENT: #12;DRIVER DETAILS: PREVIOUS ACCIDENTS: ADDRESS: VEHICLE DETAILS DATE VEHICLE PURCHASED: MAKE/MODEL: REGISTRATION: MILEAGE

  12. The year 2004 marked the 15th anniversary of the founding of the ecotourism company Rainforest

    E-Print Network [OSTI]

    Edwards, Paul N.

    Expeditions: Planning for the Future Ross School of Business student Kate Elliot and Research AssociateThe year 2004 marked the 15th anniversary of the founding of the ecotourism company Rainforest Expeditions (RFE). A decade and a half of experience led the company's cofounders, Eduardo Nycander and Kurt

  13. An Analysis of the Effectiveness and Impact of Mandatory Company Greenhouse Gas Emission Reporting Under The Companies Act 2006 (Strategic Report and Directors’ Report) Regulations 2013 

    E-Print Network [OSTI]

    Plaza, Celina

    2014-11-22T23:59:59.000Z

    The intent of this research is to examine the effectiveness and impact of the UK’s mandatory reporting of company greenhouse gas emissions, otherwise known as carbon dioxide equivalent (CO2e) emissions, in accordance to ...

  14. Annual Report Fiscal Year 2013

    E-Print Network [OSTI]

    Year in Review.............................................................. 8 Academic Accomplishments

  15. Intern experience at the General Electric Company: an internship report

    E-Print Network [OSTI]

    Aucoin, Bruce Michael, 1954-

    2013-03-13T23:59:59.000Z

    OF ENGINEERING December 1982 Major Subject: E lec t r ica l Engineering INTERN EXPERIENCE AT THE GENERAL ELECTRIC COMPANY An Internship Report by Bruce Michael Aucoin Approved as to sty le and content by: ^ 'B. D. Russell Chairman, Advisory Committee... 'iQ. s t a W.B. Jones Head, E lec t r ica l Engineering ? Member N.R. Strader Member P.A. Schniej3 r^x fnternship Supervisor T.W. Comstock College of Engineering Representati ve i Q . R.H. Page Dean of Engineering December 1982...

  16. Animal intrusion status report for fiscal year 1989

    SciTech Connect (OSTI)

    Landeen, D.S.

    1990-08-01T23:59:59.000Z

    The Protective Barrier and Warning Marker System Development Plan identified tasks that need to be completed to design a final protective barrier to implement in-place disposal of radioactive waste. This report summarizes the animal intrusion tasks that were conducted by Westinghouse Hanford Company in fiscal years 1988 and 1989 with respect to small mammals and water infiltration. 2 refs., 8 figs., 6 tabs.

  17. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    SciTech Connect (OSTI)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23T23:59:59.000Z

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  18. financial report fiscal year 2013

    E-Print Network [OSTI]

    's labs exciting breakthroughs were reported in the search for more effective treatments for diabetes, ALS

  19. Commission for Women Year-End Report

    E-Print Network [OSTI]

    Tennessee, University of

    Commission for Women Year-End Report Academic Year 2009-2010 The Commission for Women ­ Knoxville. This year's Commission has been busy. We have accomplished our goals this year, thanks in great measure will be described later in this report. Campus and Community Programs In November the Commission for Women and Women

  20. Tampa Electric Company Polk Power Station Unit Number 1. Annual report, January--December, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year`s activities associated with Tampa Electric Company`s 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.

  1. [Tampa Electric Company IGCC project]. Final public design report; Technical progress report

    SciTech Connect (OSTI)

    NONE

    1996-07-01T23:59:59.000Z

    This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

  2. Westinghouse Hanford Company operational environmental monitoring annual report, CY 1992

    SciTech Connect (OSTI)

    Schmidt, J.W.; Johnson, A.R.; McKinney, S.M.; Perkins, C.J.

    1993-07-01T23:59:59.000Z

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1992 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State in 1992. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and to control the impacts of nuclear facilities and waste sites on the workers and the local environment. Additionally, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although impacts from nuclear facilities are still seen on the Hanford Site and are slightly elevated when compared to offsite, these impacts are less than in previous years.

  3. Office of Inspector General audit report on Westinghouse Savannah River Company`s health benefit plan

    SciTech Connect (OSTI)

    NONE

    1999-01-01T23:59:59.000Z

    Westinghouse Savannah River Company (Westinghouse) manages and operates the Savannah River Site, located in Aiken, South Carolina, for the US Department of Energy (Department). Westinghouse was self-insured for health benefits and contracted with Aetna Insurance to administer the plan (service payments to providers) from Calendar Year (CY) 1989 through 1996. Westinghouse`s administrative service contract with Aetna Insurance expired on December 31, 1996. Westinghouse chose Blue Cross/Blue Shield of South Carolina (BC/BS) to administer its health plan, effective January 1, 1997. After the contract was awarded to BC/BS, 47 health care providers in the Aiken area submitted their resignations as preferred providers for BC/BS. The health care providers complained that the fees received from BC/BS were less than they were previously paid through Aetna Insurance. As a result, Westinghouse instructed BC/BS to negotiate a modified fee schedule for all the health care providers in the Aiken area. The audit objective was to determine whether the health benefit costs incurred by Westinghouse under the BC/BS contract were necessary and reasonable.

  4. EMSL Fiscal Year 2008 Annual Report

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2009-01-23T23:59:59.000Z

    This annual report provides details on the research conducted at EMSL--the Environmental Molecular Sciences Laboratory in Fiscal Year 2008.

  5. Accountability report. Fiscal Year 1996, Volume 2

    SciTech Connect (OSTI)

    NONE

    1997-05-01T23:59:59.000Z

    This report consolidates several performance-related reports into a single financial management report. Information in this report includes information previously reported in the following documents: (1) US Nuclear Regulatory Commission`s (NRC`s) annual financial statement, (2) NRC Chairman`s annual report to the President and the Congress, and (3) NRC Chairman`s semiannual report to Congress on management decisions and final actions on Office of Inspector General audit recommendations. This report also contains performance measures. The report is organized into the following subtopics: information about the US NRC, program performance, management accountability, and the audited financial statement for Fiscal Year 1996. 19 figs., 4 tabs.

  6. Annual Report Fiscal Year 2008

    E-Print Network [OSTI]

    Kroll, Kristen L.

    funding to Washington University in FY08 was $548.4M, up 2% from the previous year. Both the dollar amount funding. Funding from the NIH, consistently the University's main contributor of research funding, increased by $1.5M (0.4%) in FY08. Funding from private sources to Washington University actually increased

  7. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance...

  8. About Armstrong Coal Company In just a few short years, Armstrong Coal has grown from a start-up

    E-Print Network [OSTI]

    Fisher, Kathleen

    About Armstrong Coal Company In just a few short years, Armstrong Coal has grown from a start-up to one of the leading producers of steam coal in the Illinois Basin. The company specializes in providing custom-blended coal to meet the needs of electric power plants throughout the region. Controlling

  9. Dissertation Research Progress Report Semester and Year

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Dissertation Research Progress Report Semester and Year: All doctoral students must meet with their supervisory committee to present their progress, every semester that they register for dissertation credits report. The Dean's office will place a registration hold on students taking dissertation credits

  10. Report of Financials INTERNATIONAL BUSINESS MACHINES CORPORATION AND SUBSIDIARY COMPANIES

    E-Print Network [OSTI]

    of Business 17 Year in Review 22 Prior Year in Review 34 Looking Forward 36 Employees and Related Workforce 43

  11. Intern experience at Gulf States Utility Company: an internship report

    E-Print Network [OSTI]

    Laub, Thomas William, 1958-

    2013-03-13T23:59:59.000Z

    DON'T WANT TO BE AN ENGINEER; YOU WANT TO BE A DOCTOR, OR A DENTIST, OR A . . . 1 AND TO MY WIFE, JULIE, WHO ALWAYS SAYS: "ENGINEERS ARE WEIRD." ACKNOWLEDGEMENTS I would like to express my gratitude to my committee members Dr. R. S. Wick, Dr. G.............................................. ix LIST OF FIGURES......................................... x SECTION I. INTRODUCTION........... ....................... 1 General............. ................................ 1 Gulf States Utilities Company ........................ 2 In...

  12. Annual Site Environmental Report. Calendar Year 1997

    SciTech Connect (OSTI)

    NONE

    1997-12-01T23:59:59.000Z

    This report summarizes the environmental status of Ames Laboratory for calendar year 1997. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs.

  13. Company number 5857955 Wellcome Trust Finance plc

    E-Print Network [OSTI]

    Rambaut, Andrew

    Company number 5857955 Wellcome Trust Finance plc Annual Report and Financial Statements Year ended 30 September 2012 #12;Company number 5857955 Wellcome Trust Finance plc Contents Page Directors Trust Finance plc Directors' Report for the year ended 30 September 2012 Report of the Directors

  14. Company number 5857955 Wellcome Trust Finance plc

    E-Print Network [OSTI]

    Rambaut, Andrew

    Company number 5857955 Wellcome Trust Finance plc Annual Report and Financial Statements Year ended 30 September 2013 #12;Company number 5857955 Wellcome Trust Finance plc Contents Page Directors Trust Finance plc Directors' Report For the year ended 30 September 2013 Report of the Directors

  15. Westinghouse Hanford Company Operational Groundwater status report, 1990--1992

    SciTech Connect (OSTI)

    Johnson, V.G.

    1993-03-01T23:59:59.000Z

    This report presents information related to the water quality of ground water at the Hanford Reservation. Included are plume maps, geology, hydrology, and information on various effluent sources.

  16. Adjustment Data Report for Fiscal Years Prior to 2008 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    covers the adjustment data report for fiscal years prior to 2008. energydatareport.xls More Documents & Publications Reporting Guidance for Federal Agency Annual Report on Energy...

  17. Annual Site Environmental Report Calendar Year 2007

    SciTech Connect (OSTI)

    Dan Kayser-Ames Laboratory

    2007-12-31T23:59:59.000Z

    This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

  18. Intern experience at the General Electric Company: an internship report 

    E-Print Network [OSTI]

    Aucoin, Bruce Michael, 1954-

    2013-03-13T23:59:59.000Z

    'iQ. s t a W.B. Jones Head, E lec t r ica l Engineering ? Member N.R. Strader Member P.A. Schniej3 r^x fnternship Supervisor T.W. Comstock College of Engineering Representati ve i Q . R.H. Page Dean of Engineering December 1982... ......................................................... ..... 67 Final Reports......................................................................... ..... 67 Time Overcurrent Algorithm Evaluation.............................. 68 Event Recorder Preliminary Product D e sc r ip t io n . . . . 69 viii...

  19. Environmental report for calendar year 1989

    SciTech Connect (OSTI)

    Stencel, J.R.; Turrin, R.P.

    1991-03-01T23:59:59.000Z

    This report gives the results of the environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Year 1989 (CY89). The report is prepared to provide the US Department of Energy (DOE) and the public with information on the level of radioactive and nonradioactive pollutants, if any, added to the environment as a result of PPPL operations. The objective of the environmental report is to document evidence that DOE facility environmental protection programs adequately protect the environment and the public health. During CY89, there were no accidents, incidents, or occurrences that had a significant impact on PPPL facilities or program operations. The accidental overfilling of an underground storage tank (UST) during 1988, along with the discovery of residual hydrocarbons in the soil of an area used for unloading fuel oil trucks over the last 30 years, has the potential for a minor environmental impact and has resulted in a costly clean up in this area. Surface water analyses for both radioactive and nonradioactive pollutants have shown nothing above normally expected background values. Ambient tritium levels at less than 100 pCi/liter (3.7 Bq/liter) were measured in D-site well water. New groundwater monitoring wells were added in 1989 as a requirement for the groundwater part of our New Jersey Pollutant Discharge Elimination System (NJPDES) permit. Initial sampling of these wells indicated the presence of lead in two shallow wells next to the detention basin. Radiation exposure via airborne effluents into the environment is still at insignificant levels; however, a stack monitor for tritium is planned for 1990 to ensure compliance with new EPA regulations. Off-site surface water, soils, and biota continued to be analyzed for radioactive baselines in CY89. 51 refs., 27 figs., 40 tabs.

  20. Site Environmental Report-Calendar Year 2001

    SciTech Connect (OSTI)

    Dan Kayser

    2002-09-03T23:59:59.000Z

    The Laboratory's mission is to conduct fundamental research in the physical, chemical, materials, mathematical sciences and engineering which underlie energy generating, conversion, transmission and storage technologies, environmental improvement, and other technical areas essential to national needs. These efforts will be maintained so as to contribute to the achievement of the Department of Energy's Missions and Goals; more specifically, to increase the general levels of scientific knowledge and capabilities, to prepare engineering and physical sciences students for future scientific endeavors, and to initiate nascent technologies and practical applications arising from our basic scientific programs. The Laboratory will approach all its operations with the safety and health of all workers as a constant objective and with genuine concern for the environment. Ames Laboratory does not conduct classified research. The primary purpose of this report is to summarize the performance of Ames Laboratory's environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2001. This report is a working requirement of Department of Energy Order 231.1, Environment, Safety, and Health Reporting''.

  1. Westinghouse Hanford Company health and safety performance report

    SciTech Connect (OSTI)

    Rogers, L.

    1996-05-15T23:59:59.000Z

    Topping the list of WHC Safety recognition during this reporting period is a commendation received from the National Safety Council (NSC). The NSC bestowed their Award of Honor upon WHC for significant reduction of incidence rates during CY 1995. The award is based upon a reduction of 48 % or greater in cases involving days away from work, a 30 % or greater reduction in the number of days away, and a 15% or greater reduction in the total number of occupational injuries and illnesses. (page 2-1). A DOE-HQ review team representing the Office of Envirorunent, Safety and Health (EH), visited the Hanford Site during several weeks of the quarter. Ile 40-member Safety Management Evaluation Team (SMET) assessed WHC in the areas of management responsibility, comprehensive requirements, and competence commensurate with responsibility. As part of their new approach to oversight, they focused on the existence of management systems and programs (comparable approach to VPP). Plant/project areas selected for review within WHC were PFP, B Plant/WESF, Tank Farms, and K-Basins (page 2-2). Effective safety meetings, prejob safety meetings, etc., are a cornerstone of any successful safety program. In an effort to improve the reporting of safety meetings, the Safety/Security Meeting Report form was revised. It now provides a mechanism for recording and tracking safety issues (page 2-4). WHC has experienced an increase in the occupational injury and illness incidence rates during the first quarter of CY 1996. Trends show this increase can be partially attributed to inattention to workplace activities due 0999to the uncertainty Hanford employees currently face with recent reduction of force, reorganization, and reengineering efforts (page 2-7). The cumulative CY 1995 lost/restricted workday case incidence rate for the first quarter of CY 1996 (1.28) is 25% below the DOE CY 1991-93 average (1.70). However, the incidence rate increased 24% from the CY 1995 rate of 1.03 (page 2-8). The reengineering of the Radiological Control organization has resulted in an increase in the availability of personnel to help facilities with the procurement and use of practical ALARA measures. In addition, there seems to be more awareness of the need to use ALARA, resulting in a significant increase in the number of calls received by the ALARA Program Office for help in solving radiological problems (page 1-3). The Figure 3-2-1 chart data includes WHC, BCSR, and ICF KH employee exposure. The first quarter CY 1996 results represent the exposure of 1,913 quarterly-badged employees and an average of 846 monthly-badged employees. There were three instances of potential loss of contamination control during the calendar quarter involving three workers where internal dosimetry follow-up was performed. No intakes of contamination were detected (page 3-6). There were five skin contaminations and 18 clothing contaminations reported during this quarter in all WHC-managed facilities/areas. This represents an improvement in performance compared to the first quarter of CY 1995 (page 3-9). A monthly average of 76 Radiological Problem Reports (RPR) was issued during the first quarter of CY 1996 for a total issuance of 227 RPRS. The monthly average for the same quarter in CY 1995 was 76; a total of 228 for the quarter (Figure 3-5-1). At the end of March, WHC Dosimetry was monitoring the following employees/sub- contractors: 631 monthly standard dosimeters, 251 monthly combination dosimeters, 1,386 quarterly standard dosimeters, 472 quarterly combination dosimeters, and 3,716 annual dosimeters. During this period, Dosimetry had 987 requests for changes to the frequency, and terminated 731 dosimetry records.

  2. Report on energy trends in the 90`s -- Implications for company strategies

    SciTech Connect (OSTI)

    NONE

    1992-12-31T23:59:59.000Z

    This report summarizes the content of the conference held on May 6--8, 1992, in Dallas, Texas. Three panel discussions were held on international issues and outlook: Emerging trends in Latin America; Update on the former Soviet Union; and Balancing world energy markets. The sessions on company strategies and perspectives included presentations by Enserch Corp., Union Pacific Resources, Union Texas Petroleum Holdings, Inc., and Triton Energy Corp. These sessions included the current position of the company, problems with development of specific fields, sharing the risks of exploratory drilling, commitment to domestic exploration, and international ventures in exploration.

  3. Westinghouse Hanford Company safety analysis reports and technical safety requirements upgrade program

    SciTech Connect (OSTI)

    Busche, D.M.

    1995-09-01T23:59:59.000Z

    During Fiscal Year 1992, the US Department of Energy, Richland Operations Office (RL) separately transmitted the following US Department of Energy (DOE) Orders to Westinghouse Hanford Company (WHC) for compliance: DOE 5480.21, ``Unreviewed Safety Questions,`` DOE 5480.22, ``Technical Safety Requirements,`` and DOE 5480.23, ``Nuclear Safety Analysis Reports.`` WHC has proceeded with its impact assessment and implementation process for the Orders. The Orders are closely-related and contain some requirements that are either identical, similar, or logically-related. Consequently, WHC has developed a strategy calling for an integrated implementation of the three Orders. The strategy is comprised of three primary objectives, namely: Obtain DOE approval of a single list of DOE-owned and WHC-managed Nuclear Facilities, Establish and/or upgrade the ``Safety Basis`` for each Nuclear Facility, and Establish a functional Unreviewed Safety Question (USQ) process to govern the management and preservation of the Safety Basis for each Nuclear Facility. WHC has developed policy-revision and facility-specific implementation plans to accomplish near-term tasks associated with the above strategic objectives. This plan, which as originally submitted in August 1993 and approved, provided an interpretation of the new DOE Nuclear Facility definition and an initial list of WHC-managed Nuclear Facilities. For each current existing Nuclear Facility, existing Safety Basis documents are identified and the plan/status is provided for the ISB. Plans for upgrading SARs and developing TSRs will be provided after issuance of the corresponding Rules.

  4. Annual Site Environmental Report Calendar Year 2010

    SciTech Connect (OSTI)

    Kayser, Dan

    2011-01-31T23:59:59.000Z

    This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

  5. Exploring our world. Second year report

    SciTech Connect (OSTI)

    NONE

    1997-06-15T23:59:59.000Z

    Prince George`s Community College (PGCC), in collaboration with the Prince George`s County Public School System (PGCPS) modified the Exploring Our World, a mathematics, science, and technology program, during the spring of 1996. The second year of that program was delivered to twenty-six rising seventh and eighth grade, students, and one rising ninth grader during the period July 9, 1996 to August 2, 1996. As in 1995, Dr. Baldwin coordinated and supervised the program; Charles Hoffman was the teacher, Patricia Crosson was the counselor; Kishma Brown was the paid college mentor; and Dante Brown was a volunteer high school mentor. Exploring Our World met six hours per day, four days each week, for four weeks. One day each week was devoted to a field trip, while the other three days were spent on-campus in a variety of classroom,library, computer laboratory, and science laboratory activities. Each student was randomly assigned to one of six groups. Each group conducted a research project and presented project results to parents, staff, and other participants on the night before the last day of the program. This report contain a summary of second year of this program.

  6. AISI-DOE Direct Steelmaking Program. Annual report for the year ending November 30, 1993

    SciTech Connect (OSTI)

    Aukrust, E.

    1994-02-01T23:59:59.000Z

    This program has completed its 5th year since cost-share funding provided by DOE. The following tasks are reported on: budget, patents, talks, and publications; design and construction of gas cleaning and tempering loop; construction of pressurized smelter and operation of combined smelter and offgas system; study for ironmaking demonstration plant and for steelmaking processes; and laboratory research programs at universities and companies.

  7. Engineering Research Division publication report, calendar year 1980

    SciTech Connect (OSTI)

    Miller, E.K.; Livingston, P.L.; Rae, D.C. (eds.)

    1980-06-01T23:59:59.000Z

    Each year the Engineering Research Division of the Electronics Engineering Department at Lawrence Livermore Laboratory has issued an internal report listing all formal publications produced by the Division during the calendar year. Abstracts of 1980 reports are presented.

  8. Hanford Site Environmental Report for Calendar Year 2001

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

    2002-09-02T23:59:59.000Z

    This report summarizes environmental information for the Hanford Site in Washington State for the calendar year 2001.

  9. WEST VALLEY DEMONSTRATION PROJECT SITE ENVIRONMENTAL REPORT CALENDARY YEAR 2001

    SciTech Connect (OSTI)

    NONE

    2002-09-30T23:59:59.000Z

    THE ANNUAL (CALENDAR YEAR 2001) SITE ENVIRONMENTAL MONITORING REPORT FOR THE WEST VALLEY DEMONSTRATION PROJECT NUCLEAR WASTE MANAGEMENT FACILITY.

  10. PHMC Year 2000: Status reporting for mission essential Year 2000 projects. Revision 0, Volume 3

    SciTech Connect (OSTI)

    Layfield, K.A.

    1998-09-02T23:59:59.000Z

    The PHMC Year 2000 status reporting process is designed to encompass the reporting requirements of the Office of Management and Budget (OMB), DOE HQ, RL and the PHMC for mission essential Year 2000 projects. Status reporting is required for all Year 2000 projects. The Year 2000 project list will be maintained current as Year 2000 projects are modified, added or deleted. Reporting is required until a Year 2000 project has completed compliance assurance. Some projects will be identified as DOE HQ reportable. These are projects determined to be the most critical and due the attention of DOE HQ.

  11. Annual Site Environmental Report Calendar Year 2005

    SciTech Connect (OSTI)

    Dan Kayser

    2005-12-31T23:59:59.000Z

    This report summarizes the environmental status of Ames Laboratory for calendar year 2005. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2005, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled accordingly to all applicable EPA, State, Local and DOE Orders. The most recent RCRA inspection was conducted by EPA Region VII in January 1999. The Laboratory received a notice of violation (NOV) which included five citations. There have been no inspections since then. The citations were minor and were corrected by the Laboratory within the time allocated by the EPA. See correspondence in Appendix D. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2005. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2005. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. Pollution awareness, waste minimization and recycling programs were implemented in 1990 and updated in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, CRTs, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-CH, through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of ''outstanding'' was achieved in 2005. The Laboratory underwent a voluntary Environmental Management Review (EMR) in 2003. Members of the Environmental Protection Agency (EPA) Region VII and Iowa Department of Natural Resources (IDNR) conducted the EMR in November 2003. The EMR was conducted as part of the process for developing and implementing an Environmental Management System (EMS) at the Laboratory. The final EMR report was received on June 19, 2003. Most of the recommendations were implemented to fulfill the EMS requirements for the ISO 14001:1996 standard. In 2004, the Laboratory ''Self Declared'' that it had fully integrated an EMS with its Integrated Safety Management System (ISMS) and met the requirements of Executive Order 13148. In November of 2005 DOE-CH conducted a self-declaration assessment of the Laboratory's EMS. The assessment found two nonconformities that the Laboratory promptly corrected, allowing the DOE-CH Ames Site Office to accept the Laboratory's self-declaration (See EMS Assessment letter, December 21, 2005 in Appendix D).

  12. Interim operations report for atmospheric fluidized-bed combustion conversion at Northern States Power Company

    SciTech Connect (OSTI)

    Thimsen, D. (Hamilton Maurer International, Inc., Falcon Heights, MN (USA))

    1991-03-01T23:59:59.000Z

    Northern States Power Company converted its Black Dog Station Unit No. 2 boiler from a front wall fired pulverized coal boiler to a bubbling atmospheric fluidized bed combustor (AFBC) boiler. The resulting unit was uprated from 85 MWe to 130 MWe burning western subbituminous coal. This report describes the AFBC operating and maintenance experience in the startup period from initial operation in June 1986 through March 1989 when a turbine oil fire caused a forced outage of 8 months. A brief review of the construction history is given in Section 1. Section 2 chronicles the AFBC operation. Section 3 describes how the boiler is restarted under several conditions. The performance history of the systems in the AFBC that are peculiar to the AFBC process or directly impacted by the AFBC process are described in detail in Section 4. The AFBC conversion at the Black Dog station has met nearly all of the original design objectives: (1) The unit can operate at rated output of 130 MWe burning western subbituminous coal, (2) The design life of the unit has been extended 25 years, (3) It has been shown that the EPA New Source Performance Standards for NO{sub x} and SO{sub 2} can be met with no flue gas treatment, (4) Operators have conducted over 200 routine daily unit restarts confirming the ability of the unit to serve in daily cycling mode, and (5) A variety of fuels have been successfully burned in the AFBC. The only objective that remains partially achieved is routine operation at full load. The boiler/turbine/generator have been shown to be fully capable of operation at full load, but the electrostatic precipitators (which were largely unchanged during the retrofit) have been inadequate to allow full load operation while remaining within permitted opacity and particulate emissions. The unit is currently dispatched in daily cycling service and is limited to operation below 106 MWe by its emissions control permit. 12 refs., 34 figs., 6 tabs.

  13. An examination of the financial statements of twenty-five oil companies for a ten-year period

    E-Print Network [OSTI]

    Hatfield, W. C

    1952-01-01T23:59:59.000Z

    for so doing in the ten year period covered by this study. yor the pexiod 1941 1950?cost was the most frequently used method of inventoxy valuation for all inventories other tixan materials and supplies bv the companies selected. Cost or market... cost is involved in inventozy valuations the detezmination of cost presents a problemh Lznyswthods are availabiex bu't only four &Is used in the xeports exasdnedd A tabulation of the extent to which each oi' the four methods is used is presented...

  14. EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...

    Office of Environmental Management (EM)

    EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan...

  15. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

    2010-02-04T23:59:59.000Z

    This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

  16. Procurement Organization, Sandia National Laboratories. Annual report, fiscal year 1995

    SciTech Connect (OSTI)

    Stimak, D.R.

    1996-05-01T23:59:59.000Z

    This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1995. Activities for both the New Mexico and California locations are included.

  17. Annual report procurement organization Sandia National Laboratories fiscal year 1996

    SciTech Connect (OSTI)

    Palmer, D.L.

    1997-04-01T23:59:59.000Z

    This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1996, Activities for both the New Mexico and California locations are included.

  18. Three year progress report and renewal request

    SciTech Connect (OSTI)

    Powers, E.L.

    1980-08-01T23:59:59.000Z

    A review of research accomplisments during the contract period is presented. Reported projects include: (1) metals as radiation sensitizers of spores; (2) studies on transforming and calf thymus DNA; (3) pulse radiolysis studies on DNA components; (4) studies of metal complexes of DNA compounds; and (5) dosimetry of the pulsed electron beam. (ACR)

  19. Environmental monitoring report for calendar year 1988

    SciTech Connect (OSTI)

    Stencel, J.R.

    1989-05-01T23:59:59.000Z

    The results of the 1988 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three tokamak machines, the Princeton Beta Experiment Modification (PBX-M) and the Tokamak Fusion Test Reactor (TFTR), were in operation during the year. The Environmental Committee, which is a standing committee of the Executive Safety Board (ESB), continued to review items of environmental importance. During CY88 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations. Over the last two years the Department of Energy conducted major environmental audits at all of its facilities, including PPPL. No significant environmental concerns were noted as a result of the inspection and sampling at PPPL. 43 refs., 25 figs., 33 tabs.

  20. Site environmental report for calendar year 1992

    SciTech Connect (OSTI)

    Naidu, J.R.; Royce, B.A.; Miltenberger, R.P.

    1993-05-01T23:59:59.000Z

    This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1992. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, only the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded, on occasion only, the fecal and total coliform concentration limits at the discharge point. This was later attributed to off-site Contractor Laboratory quality assurance problems. The environmental monitoring data has continued to demonstrate, besides the site specific contamination of ground water and soil resulting from past operations, that compliance was achieved with environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

  1. Environmental monitoring report for calendar year 1983

    SciTech Connect (OSTI)

    Stencel, J.R.

    1984-05-01T23:59:59.000Z

    The results of the environmental monitoring program for CY83 for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Besides the Princeton Large Torus (PLT) and Poloidal Divertor Experiment (PDX), PPPL's largest tokamak, the Tokamak Fusion Test Reactor (TFTR) had a full year of operation. A phased approach has been planned to assure the proper level of monitoring to coincide with the TFTR program. During CY83 there were no adverse effects to the environment resulting from any operational program at PPPL and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations.

  2. Environmental monitoring report for calendar year 1984

    SciTech Connect (OSTI)

    Stencel, J.R.

    1985-05-01T23:59:59.000Z

    The results of the environmental monitoring program for CY84 for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The Princeton Large Torus (PLT), Princeton Beta Experiment (PBX), and PPPL's largest tokamak, the Tokamak Fusion Test Reactor (TFTR) had a complete year of run time. In addition, the S-1 Spheromak was in operation and the RF Test Facility came on-line. The phased approach of TFTR environmental monitoring continued with the addition of neutron monitors. During CY84 there were no adverse effects to the environment resulting from any operational program at PPPL, and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations.

  3. Elizabeth Harvey Memorial Sustainable Development Intern Year End Report

    E-Print Network [OSTI]

    Elizabeth Harvey Memorial Sustainable Development Intern Year End Report For the Academic Year 2011 ­ 2012 Submitted May 8th , 2012 to the Bishop's Sustainable Development and Land Use Committee by Lauri Lidstone #12;Sustainable Development Student Intern Report 2011-2012 1 I would like to thank the Elizabeth

  4. Site environmental report for calendar year 1996

    SciTech Connect (OSTI)

    NONE

    1997-08-01T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts to the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits.

  5. Microsoft Word - RFOLF Yearly Report - 2013_TAC

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthNrr-osamsRFLMAGunnison, ColoradoReport

  6. Environmental monitoring report for Calendar Year 1986

    SciTech Connect (OSTI)

    Stencel, J.R.

    1987-05-01T23:59:59.000Z

    The results of the 1986 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Large Torus (PLT) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. The Princeton Beta Experiment (PBX) was shut down in December 1985 to undergo major modifications, and will recommence operations in 1987. PLT was shut down in December 1986. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1986. The Environmental Committee became a standing committee of the Executive Safety Board (ESB) and continued to review items of environmental importance. During CY86 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations.

  7. Environmental monitoring report for calendar year 1987

    SciTech Connect (OSTI)

    Stencel, J.R.

    1988-05-01T23:59:59.000Z

    The results of the 1987 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Beta Experiment Modification (PBX-M) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1987. The Environmental Committee which is a standing committee of the Executive Safety Board (ESB) continued to review items of environmental importance. During CY87 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations. 41 refs., 24 figs., 34 tabs.

  8. Environmental monitoring report for calendar year 1985

    SciTech Connect (OSTI)

    Stencel, J.R.

    1986-05-01T23:59:59.000Z

    The results of the environmental monitoring program for CY85 for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. All of the tokamak machines, the Princeton Large Torus (PLT), Princeton Beta Experiment (PBX), and the Tokamak Fusion Test Reactor (TFTR), has a full year of run time. In addition, the S-1 Spheromak and the RF Test Facility were in operation. The phased approach to TFTR environmental monitoring continued with the establishment of locations for off-site monitoring. An environmental committee established in December 1984 reviewed items of environmental importance. During CY85 no adverse effects to the environmental resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations.

  9. Health-hazard evaluation report HETA-86-053-1933, Gray Pprinting Company, Fostoria, Ohio

    SciTech Connect (OSTI)

    Crandall, M.S.; Boiano, J.M.; Fidler, A.T.; Cantor, F.

    1988-10-01T23:59:59.000Z

    The Gray Printing Company, located in Fostoria, Ohio was studied for potential employee exposures to solvents used in the offset-printing process at that site. The company produced 30 monthly magazines plus various commercial catalogs and brochures. The employment at the site was 185 persons. Equipment used in the production of printed material included photographic-typesetting and sheet-fed and roll fed offset lithographic printing processes. Over two workdays the sheet fed press operator's isopropanol exposures ranged from 247 to 501 mg/m/sup 3/ with personal breathing zone naphtha concentrations of 0.03 to 8.9 mg/m/sup 3/. The web press operator's naphtha exposures ranged from 0.03 to 7.7 mg/m/sup 3/. These workers were also exposed to low concentrations of isopropanol. The highest short term isopropanol exposure was 726 mg/m/sup 3/. Short term exposures to blanket and roller cleaning solvent were low, less than 10 mg/m/sup 3/. A higher than expected reporting of symptoms related to central nervous system depression, difficulty in concentrating, dizziness, cough, chest pain, and dry skin were noted among workers. The authors conclude that there was an increased prevalence of neurotoxic, respiratory, and skin problems among workers using organic solvents. Due to the prevalence of these symptoms, the authors recommend measures for reducing employee exposure to solvents.

  10. Health-hazard evaluation report HETA 84-449-1778, Agrico Chemical Company, Pierce, Florida

    SciTech Connect (OSTI)

    Singal, M.

    1987-02-01T23:59:59.000Z

    In response to a request from the International Chemical Workers Union an evaluation was made of respiratory problems among workers at the Agrico Chemical Company, Pierce, Florida, which closed in 1979. Specific concern had been expressed regarding exposures to silica, coke, and asbestos. Of 108 persons participating in the study, 91 had worked at the elemental phosphorus facility (EP). Of 88 participants who had ten or more years in the phosphate industry, the 36 workers with ten or more years in the EP facility were no more likely to have chronic cough, shortness of breath, abnormal lung sounds on physical examination, pulmonary function impairment, or x-ray signs of fibrogenic dust exposure than those with less than 10 years exposure. Those working longer than 10 years in the EP facility had numerically higher prevalence of chronic bronchitis and chronic wheeze, but the differences were not statistically significant. The author concludes that no association between health and time at the EP facility could be discerned from the available data, although it is possible that the study participants were not representative of all former facility workers.

  11. Independent Activity Report, CH2M Hill Plateau Remediation Company- January 2011

    Broader source: Energy.gov [DOE]

    Review of the CH2M Hill Plateau Remediation Company Unreviewed Safety Question Procedure [ARPT-RL-2011-003

  12. Report on a Fatal Accident and Fire at the West London Terminal of Esso Petroleum Company Limited on 1st April, 1967 

    E-Print Network [OSTI]

    Black, H. K.

    1968-01-01T23:59:59.000Z

    A12.P46 Report on a Fatal Accident and Fire at the West London Terminal of Esso Petroleum Company Limited on 1st April, 1967...

  13. Annual Hanford Seismic Report for Fiscal Year 2004

    SciTech Connect (OSTI)

    Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.

    2004-12-07T23:59:59.000Z

    This report describes seismic activity at and around the Hanford Site during Fiscal Year 2004. It is also the first description of seismic activity during the fourth quarter of FY04.

  14. Hanford Site Environmental Report for Calendar Year 2003

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

    2004-09-01T23:59:59.000Z

    This report is published each year by DOE to summarize environmental data and information, describe environmental management performance, demonstrate the status of compliance with environmental regulations, and highlight major environmental programs and efforts.

  15. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02T23:59:59.000Z

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  16. Environmental Molecular Sciences Laboratory Annual Report: Fiscal Year 2006

    SciTech Connect (OSTI)

    Foster, Nancy S.; Showalter, Mary Ann

    2007-03-23T23:59:59.000Z

    This report describes the activities and research performed at the Environmental Molecular Sciences Laboratory, a Department of Energy national scientific user facility at Pacific Northwest National Laboratory, during Fiscal Year 2006.

  17. Annual Waste Minimization Summary Report, Calendar Year 2008

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2009-02-01T23:59:59.000Z

    This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2008.

  18. Health-hazard evaluation report HETA 88-391-2156, Morton Salt Company, Weeks Island, Louisiana

    SciTech Connect (OSTI)

    Ferguson, R.P.; Knutti, E.B.

    1991-11-01T23:59:59.000Z

    In response to a request from the International Chemical Workers Union, project director, an evaluation was undertaken of possible hazardous working conditions at the Morton Salt Company (SIC-1479), Weeks Island, Louisiana. At Weeks Island the salt was mined from large domes, circular in shape and from a few hundred yards to a mile across. The only detectable overexposures in the mining operation were to coal-tar pitch volatiles. None of the 20 personal breathing zone and area air samples collected in the mill were above detectable limits for asbestos (1332214). The prevalences of chronic cough and chronic phlegm reported were statistically different, exceeding those reported by a group of nonexposed blue collar workers. Chronic symptoms were reported by underground workers in all smoking categories, but only by those surface workers who also smoked. There were more complaints about eye irritation and tearing of the eyes in the underground workers, consistent with diesel byproduct exposure. Four workers were identified through pulmonary function test results with mild obstructive lung disease and one with moderate obstructive lung disease. Three workers with mild restriction of lung volume were noted. None of the 61 chest films taken read positively for pneumoconiosis. The authors conclude that overexposures to coal-tar pitch volatiles existed at the time of the survey. The authors recommend measures for reducing occupational exposures to workplace contaminants. A follow up medical questionnaire survey should be conducted.

  19. 1994 battery shipment review and five-year forecast report

    SciTech Connect (OSTI)

    Fetherolf, D. [East Penn Manufacturing Co., Lyon Station, PA (United States)

    1995-12-31T23:59:59.000Z

    This paper presents a 1994 battery shipment review and five year forecast report. Data is presented on replacement battery shipments, battery shipments, car and truck production, truck sales, original equipment, shipments for passenger cars and light commercial vehicles, and ten year battery service life trend.

  20. The MAZOOPS Project Third year of engineering school internship report

    E-Print Network [OSTI]

    Jaffe, Jules

    The MAZOOPS Project Third year of engineering school internship report MPL supervisor: Dr. Jules S report ­ Florian Aulanier Page 1 sur 33 1 Acknowledgment This internship has been for me a very good group on the Multiple Angle Zooplankton Sonar and who has supervised this internship in organizing group

  1. OCRWM annual report to Congress, fiscal year 1997

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    This report presents the progress in the activities of the Office of Civilian Radioactive Waste Management. Chapters include: Yucca Mountain site characterization project; Waste acceptance, storage and transportation project; Program management; Working with external parties; and Financial management. Also included in five appendices are: financial statements; key federal laws and regulations; fiscal year 1997 Congressional testimony and meetings with regulators and oversight bodies; OCREM publications for fiscal year 1997; and selected publications from other organizations during fiscal year 1997.

  2. End-of-Year ETF Report Fiscal Year 2010-11

    E-Print Network [OSTI]

    End-of-Year ETF Report Fiscal Year 2010-11 College of Textiles 1. Categorized ETF Expenditure,023 Microscopes for Fiber Science Laboratory $39,555 110 Classroom Upgrades $34,916 Teaching Lab Machines and Supplies $10,000 Knitting Machine $20,487 Supplies for teaching labs (chemicals, sensors, fibers, yarns

  3. End-of-Year ETF Report Fiscal Year 2008-09

    E-Print Network [OSTI]

    End-of-Year ETF Report Fiscal Year 2008-09 College of Textiles 1. Categorized ETF Expenditure,000 Knitting Machine $12,768 Examolites luminaries $35,216 Supplies for labs (microscopes, chemicals learned from the class. 3. Knitting Machine funds were matched from College resources. This new machine

  4. Summary Report for Contract 330088-A-T9: Procurement of Zircaloy-4 Products from Superior Tube Company

    SciTech Connect (OSTI)

    Graves, Roger E.

    2007-06-27T23:59:59.000Z

    This report documents the initial procurement activities from the Superior Tube Company associated with production quantities of Zircaloy 4 components (Contract 330088-A-T9) and the demonstration of their capability to produce full-length getter components (Contract 406957-A-T5).

  5. 2010 U.S. Smart Grid Vendor Ecosystem Report on the companies...

    Energy Savers [EERE]

    smart grid landscape The Smart Grid vendor ecosystem is an increasingly interdependent web of companies. Vendors of Advanced Metering Infrastructure (AMI) products (meters,...

  6. Annual Site Environmental Report for Calendar Years 2009 to 2010

    SciTech Connect (OSTI)

    Virginia Finley

    2012-08-08T23:59:59.000Z

    This report presents the results of environmental activities and monitoring programs at the Princeton Plasma Physics Laboratory (PPPL) for Calendar Years 2009-2010. The report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are released into the environment as a result of PPPL operations. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2009-2010. The objective of the Site Environmental Report is to document PPPL's efforts to protect the public's health and the environment through its environmental protection, safety, and health programs. __________________________________________________

  7. Year 2000 assessment report, Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Weir, D.

    1998-04-21T23:59:59.000Z

    The purpose of this report is to advise managers on the status of Year 2000 readiness at the Laboratory and provide a summary of critical issues to be addressed in order to ensure that the Year 2000 date rollover will not disrupt Laboratory Operations. The Laboratory`s Year 2000 council members are in the first phase of Year 2000 plans: gathering data and assessing the status of their divisions or programs. This first snapshot of the Laboratory Year 2000 readiness assessment is expected to grow and change over time as more refined assessments, plans, and schedules are developed and as more information becomes available. Here are findings to date: (1) Embedded systems` status not known. (2) Preliminary cost estimates for Year 2000 repairs, testing, and implementation are estimated to be at least $5.9 million, not including embedded systems. (3) The Laboratory is required to make unavoidable purchases of Year 2000-compliant products. (4) The Year 2000 short-term issue forces some long-term transition plans to be set aside. (5) The Laboratory is at risk for the following consequences if they can`t demonstrate an active Year 2000 program: risk of system failures; potential funding freezes by the OMB and DOE; legal liabilities; and risk to the UC contract. (6) The deadline for this project is immutable. (7) DOE is continually increasing reporting requirements, expanding from only DOE mission-essential to all operations. (7) DOE audit criticizes the Laboratory`s mission-essential systems planning.

  8. Exploring the Forecasting Potential of Company Annual Reports Xin Ying Qiu

    E-Print Network [OSTI]

    Street, Nick

    features can be further studied to understand their roles as indicators of company's future performance that is as useful as the financial ratios to financial analysts while predicting the company's future prospects changes, reasons for revenue and cost changes, planned expenditures, known trends, and future liquidity

  9. Fusion safety program Annual report, Fiscal year 1995

    SciTech Connect (OSTI)

    Longhurst, G.R.; Cadwallader, L.C.; Carmack, W.J. [and others

    1995-12-01T23:59:59.000Z

    This report summarizes the major activities of the Fusion Safety Program in FY-95. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory, and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions. Among the technical areas covered in this report are tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate database development, and safety code development and application to fusion safety issues. Most of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and the technical support for commercial fusion facility conceptual design studies. A final activity described is work to develop DOE Technical Standards for Safety of Fusion Test Facilities.

  10. TEXAS PAVEMENT PRESERVATION CENTER FOUR-YEAR SUMMARY REPORT

    E-Print Network [OSTI]

    Texas at Austin, University of

    TEXAS PAVEMENT PRESERVATION CENTER FOUR-YEAR SUMMARY REPORT Dr. Yetkin Yildirim, P.E., TPPC Director E-mail: yetkin@mail.utexas.edu Mailing address: Texas Pavement Preservation Center Center................................................................................................ 100 #12;#12;TEXAS PAVEMENT PRESERVATION CENTER (TPPC) About the Center The Texas Pavement Preservation

  11. Ames Laboratory site environmental report, calendar year 1995

    SciTech Connect (OSTI)

    NONE

    1997-01-01T23:59:59.000Z

    This report summarizes the environmental status of Ames Laboratory for calendar year 1995. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs.

  12. Ecological Monitoring and Compliance Program Fiscal Year 2003 Report

    SciTech Connect (OSTI)

    Bechtel Nevada

    2003-12-01T23:59:59.000Z

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

  13. Annual Waste Minimization Summary Report, Calendar Year 2009

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-02-07T23:59:59.000Z

    This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC, for the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2009. This report was developed in accordance with the requirements of the Nevada Test Site Resource Conservation and Recovery Act Permit (No. NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by NNSA/NSO activities and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by NNSA/NSO.

  14. Annual Waste Minimization Summary Report Calendar Year 2007

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2008-02-01T23:59:59.000Z

    This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year (CY) 2007. This report was developed in accordance with the requirements of the Nevada Test Site (NTS) Resource Conservation and Recovery Act (RCRA) Permit (number NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by the NNSA/NSO and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by the NNSA/NSO.

  15. Laboratory directed research development annual report. Fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1997-05-01T23:59:59.000Z

    This document comprises Pacific Northwest National Laboratory`s report for Fiscal Year 1996 on research and development programs. The document contains 161 project summaries in 16 areas of research and development. The 16 areas of research and development reported on are: atmospheric sciences, biotechnology, chemical instrumentation and analysis, computer and information science, ecological science, electronics and sensors, health protection and dosimetry, hydrological and geologic sciences, marine sciences, materials science and engineering, molecular science, process science and engineering, risk and safety analysis, socio-technical systems analysis, statistics and applied mathematics, and thermal and energy systems. In addition, this report provides an overview of the research and development program, program management, program funding, and Fiscal Year 1997 projects.

  16. (Data in kilograms of gallium content unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 2005. One company in Utah

    E-Print Network [OSTI]

    66 GALLIUM (Data in kilograms of gallium content unless otherwise noted) Domestic Production, [(703) 648-7719, dkramer@usgs.gov, fax: (703) 648-7975] #12;67 GALLIUM Consolidation of companies and Use: No domestic primary gallium recovery was reported in 2005. One company in Utah recovered

  17. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1997. Two companies in

    E-Print Network [OSTI]

    and Use: No domestic primary gallium recovery was reported in 1997. Two companies in Oklahoma and Utah in optoelectronic devices, which include light-emitting diodes (LED's), laser diodes, photodetectors, and solar-than-expected increase in demand. The company planned to operate its refineries in France and Germany using stockpiled

  18. (Data in kilograms of gallium content, unless noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1995. Two companies in

    E-Print Network [OSTI]

    : No domestic primary gallium recovery was reported in 1995. Two companies in Oklahoma and Utah recovered devices, which include light-emitting diodes (LED's), laser diodes, photodetectors, and solar cells contract to a consortium of private companies to develop gallium nitride technology. Blue LED's are useful

  19. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1999. Two companies in

    E-Print Network [OSTI]

    and Use: No domestic primary gallium recovery was reported in 1999. Two companies in Oklahoma and Utah in optoelectronic devices, which include light-emitting diodes (LED's), laser diodes, photodetectors, and solar in July. The additional facility was expected to double the company's refinery capacity to 100

  20. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 2002. Two companies in

    E-Print Network [OSTI]

    and Use: No domestic primary gallium recovery was reported in 2002. Two companies in Oklahoma and Utah diodes, photodetectors, and solar cells. Integrated circuits represented 65% of gallium demand forecasts of market growth, several companies were consolidating, reducing, or eliminating their Ga

  1. Laboratory Directed Research and Development Annual Report - Fiscal Year 2000

    SciTech Connect (OSTI)

    Fisher, Darrell R.; Hughes, Pamela J.; Pearson, Erik W.

    2001-04-01T23:59:59.000Z

    The projects described in this report represent the Laboratory's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides, a) a director's statement, b) an overview of the laboratory's LDRD program, including PNNL's management process and a self-assessment of the program, c) a five-year project funding table, and d) project summaries for each LDRD project.

  2. Hanford Site Environmental Report for Calendar Year 2005

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

    2006-09-28T23:59:59.000Z

    This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2005; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

  3. Hanford Site Environmental Report for Calendar Year 2004

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

    2005-09-29T23:59:59.000Z

    This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2003; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

  4. Ecological Monitoring and Compliance Program Fiscal Year 1999 Report

    SciTech Connect (OSTI)

    Cathy A. Wills

    1999-12-01T23:59:59.000Z

    The Ecological and Compliance program, funded through the U. S. Department of Energy, Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1999. Program activities included: (1) biological surveys at proposed construction sites (2) desert tortoise compliance (3) ecosystem mapping (4) sensitive species and unique habitat monitoring and (5) biological monitoring at the HAZMAT Spill Center.

  5. Advanced Automotive Technologies annual report to Congress, fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1998-03-01T23:59:59.000Z

    This annual report serves to inform the United States Congress on the progress for fiscal year 1996 of programs under the Department of Energy`s Office of Advanced Automotive Technologies (OAAT). This document complies with the legislative requirement to report on the implementation of Title III of the Automotive Propulsion Research and Development Act of 1978. Also reported are related activities performed under subsequent relevant legislation without specific reporting requirements. Furthermore, this report serves as a vital means of communication from the Department to all public and private sector participants. Specific requirements that are addressed in this report are: Discussion of how each research and development contract, grant, or project funded under the authority of this Act satisfies the requirements of each subsection; Current comprehensive program definition for implementing Title III; Evaluation of the state of automotive propulsion system research and development in the United States; Number and amount of contracts and grants awarded under Title III; Analysis of the progress made in developing advanced automotive propulsion system technology; and Suggestions for improvements in automotive propulsion system research and development, including recommendations for legislation.

  6. Hanford Site environmental surveillance data report for calendar year 1996

    SciTech Connect (OSTI)

    Bisping, L.E.

    1997-09-01T23:59:59.000Z

    Environmental surveillance at the Hanford Site collects data that provides a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor several chemicals and metals in Columbia River water and sediment. In addition, Hanford Site wildlife samples were also collected for metals analysis. Pacific Northwest National Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1996 describes the site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, and environmental monitoring activities and results. The report includes a summary of offsite and onsite environmental monitoring data collected during 1996 by PNNL`s Environmental Monitoring Program. Appendix A of that report contains data summaries created from river monitoring and sediment data. This volume contains the actual raw data used to create the summaries. The data volume also includes Hanford Site drinking water radiological data.

  7. Hanford Site Environmental Surveillance Data Report for Calendar Year 2008

    SciTech Connect (OSTI)

    Bisping, Lynn E.

    2009-08-11T23:59:59.000Z

    Environmental surveillance on and around the Hanford Site, located in southeastern Washington State, is conducted by the Pacific Northwest National Laboratory, which is operated by Battelle for the U.S. Department of Energy. The environmental surveillance data collected for this report provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanford Site operations. Data were also collected to monitor several chemicals and metals in Columbia River water, sediment, and wildlife. These data are included in this appendix. This report is the first of two appendices that support "Hanford Site Environmental Report for Calendar Year 2008" (PNNL-18427), which describes the Hanford Site mission and activities, general environmental features, radiological and chemical releases from operations, status of compliance with environmental regulations, status of programs to accomplish compliance, Hanford Site cleanup and remediation efforts, and environmental monitoring activities and results.

  8. The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 1999

    SciTech Connect (OSTI)

    Bechtel Jacobs Company LLC

    2000-03-01T23:59:59.000Z

    This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 1999. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 199a). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 1999, these CY 1999 goals were extended to CY 2000 for all waste streams that generated waste in 1999. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 51 waste streams met or exceeded their reduction goal based on the CY 1999 data.

  9. The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 2000

    SciTech Connect (OSTI)

    Bechtel Jacobs Company LLC

    2001-03-01T23:59:59.000Z

    This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 2000. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 2000). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 2000, these goals were extended to CY 2001 for all waste streams that generated waste in 2000. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 50 waste streams met or exceeded their reduction goal based on the CY 2000 data.

  10. Small business report to Congress for fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    This report describes the various programs of the Office of Small and Disadvantaged Business Utilization designed to ensure small businesses have an equitable opportunity to do business with the Department of Energy. In addition, this report covers 33 organizational components of the Department and details the extent to which small business firms are participating in the procurement process as well as efforts taken to ensure continued involvement. During fiscal year 1992, the Department met or exceeded its percentage and dollar goals for 8(a) concerns, labor surplus area set-asides, and for-subcontracting to small businesses. The Department`s contract awards to small businesses totaled $3.1 billion (17.3 percent of the 18.1 billion the Department spent on contracts), which consisted of Departmental prime contracts and management and operating contracts. During fiscal year 1992, the Department awarded contracts totaling $307 million to small disadvantaged businesses under Section 8(a) of the U.S. Small Business Act. This total represents 1.7 percent of all prime contracts over $25,000 awarded by the Department during that period. The Department and its management and operating contractors awards to women-owned businesses and labor surplus area set-asides totaled $327 million and $596 million, respectively. The achievements in small business subcontracting for fiscal year 1992 was $234 million, including $23 million to small disadvantaged firms.

  11. Westinghouse Hanford Company health and safety performance report. Fourth quarter calendar year 1995

    SciTech Connect (OSTI)

    Lansing, K.A.

    1996-03-01T23:59:59.000Z

    WHC once again achieved significant improvement in its Overall safety performance as reflected by the injury/illness incidence rates. Incidence rates with one exception (Restricted Work Cases Only Incidence Rate) reflect sharp reductions. The increase in the Restricted Work Case Incidence Rate appears to be the result of effective case management activity and the return to work in a partial duty capacity of employees who may otherwise have been off work due to a work-related injury/illness (Page 2--9).

  12. Westinghouse Hanford Company health and safety performance report. Fourth quarter calendar year 1994

    SciTech Connect (OSTI)

    Lansing, K.A.

    1995-03-01T23:59:59.000Z

    Detailed information pertaining to As Low As Reasonably Achievable/Contamination Control Improvement Project (ALARA/CCIP) activities are outlined. Improved commitment to the WHC ALARA/CCIP Program was experienced throughout FY 1994. During CY 1994, 17 of 19 sitewide ALARA performance goals were completed on or ahead of schedule. Estimated total exposure by facility for CY 1994 is listed in tables by organization code for each dosimeter frequency. Facilities/areas continue to utilize the capabilities of the RPR tracking system in conjunction with the present site management action-tracking system to manage deficiencies, trend performance, and develop improved preventive efforts. Detailed information pertaining to occupational injuries/illnesses are provided. The Industrial Safety and Hygiene programs are described which have generated several key initiatives that are believed responsible for improved safety performance. A breakdown of CY 1994 occupational injuries/illnesses by type, affected body group, cause, job type, age/gender, and facility is provided. The contributing experience of each WHC division/department in attaining this significant improvement is described along with tables charting specific trends. The Radiological Control Program is on schedule to meet all RL Site Management System milestones and program commitments.

  13. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    SciTech Connect (OSTI)

    Bechtel Nevada Ecological Services

    1998-10-01T23:59:59.000Z

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

  14. Hanford Site annual dangerous waste report, calendar year 1995

    SciTech Connect (OSTI)

    NONE

    1995-12-31T23:59:59.000Z

    This report is a compilation of data on the disposition of hazardous wastes generated on the Hanford Reservation. This information is on EPA requirement every two years. Wastes include: tank simulant waste; alkaline batteries; lead-based paints; organic solvents; light bulbs containing lead and/or mercury; monitoring well drilling wastes; soils contaminated with trace metals, halogenated organics, or other pollutants; Ni-Cd batteries; pesticides; waste oils and greases; wastes from the cleanup of fuel/gasoline spills; filters; metals; and other.

  15. Brookhaven National Laboratory site environmental report for calendar year 1990

    SciTech Connect (OSTI)

    Miltenberger, R.P.; Royce, B.A.; Naidu, J.R.

    1992-01-01T23:59:59.000Z

    Brookhaven National Laboratory (BNL) carries out basic and applied research in the following fields: high-energy nuclear and solid state physics; fundamental material and structure properties and the interactions of matter; nuclear medicine, biomedical and environmental sciences; and selected energy technologies. In conducting these research activities, it is Laboratory policy to protect the health and safety of employees and the public, and to minimize the impact of BNL operations on the environment. This document is the BNL environmental report for the calendar year 1990 for the safety and Environmental Protection division and corners topics on effluents, surveillance, regulations, assessments, and compliance.

  16. ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT

    SciTech Connect (OSTI)

    BECHTEL NEVADA ECOLOGICAL SERVICES

    2006-03-01T23:59:59.000Z

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

  17. FTCP Annual Report - Calendar Year 2008 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCP Annual Plan -Report -

  18. FTCP Annual Report - Fiscal Year 2002 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCP Annual Plan -Report -2

  19. FTCP Annual Report - Fiscal Year 2004 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCP Annual Plan -Report -24

  20. Visualizing Higher Order Finite Elements: FY05 Yearly Report.

    SciTech Connect (OSTI)

    Thompson, David; Pebay, Philippe Pierre

    2005-11-01T23:59:59.000Z

    This report contains an algorithm for decomposing higher-order finite elementsinto regions appropriate for isosurfacing and proves the conditions under which thealgorithm will terminate. Finite elements are used to create piecewise polynomialapproximants to the solution of partial differential equations for which no analyticalsolution exists. These polynomials represent fields such as pressure, stress, and mo-mentim. In the past, these polynomials have been linear in each parametric coordinate.Each polynomial coefficient must be uniquely determined by a simulation, and thesecoefficients are called degrees of freedom. When there are not enough degrees of free-dom, simulations will typically fail to produce a valid approximation to the solution.Recent work has shown that increasing the number of degrees of freedom by increas-ing the order of the polynomial approximation (instead of increasing the number offinite elements, each of which has its own set of coefficients) can allow some typesof simulations to produce a valid approximation with many fewer degrees of freedomthan increasing the number of finite elements alone. However, once the simulation hasdetermined the values of all the coefficients in a higher-order approximant, tools donot exist for visual inspection of the solution.This report focuses on a technique for the visual inspection of higher-order finiteelement simulation results based on decomposing each finite element into simplicialregions where existing visualization algorithms such as isosurfacing will work. Therequirements of the isosurfacing algorithm are enumerated and related to the placeswhere the partial derivatives of the polynomial become zero. The original isosurfacingalgorithm is then applied to each of these regions in turn.3 AcknowledgementThe authors would like to thank David Day and Louis Romero for their insight into poly-nomial system solvers and the LDRD Senior Council for the opportunity to pursue thisresearch. The authors were supported by the United States Department of Energy, Officeof Defense Programs by the Labratory Directed Research and Development Senior Coun-cil, project 90499. Sandia is a multiprogram laboratory operated by Sandia Corporation,a Lockheed-Martin Company, for the United States Department of Energy under contractDE-AC04-94-AL85000.4

  1. Ecological Monitoring and Compliance Program Fiscal Year 2000 Report

    SciTech Connect (OSTI)

    Wills, C.A.

    2000-12-01T23:59:59.000Z

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition ecoregion. Seventy bats, representing four bat species of concern, were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at selected tunnel and mine entrances verifying that some NTS mines and tunnels are used as bat roosts. Thirty-seven adult horses and 11 foals were counted this year. Four of the five foals observed last year have survived to yearlings. A monitoring plan for NTS horses was completed. Six active red-tailed hawk nests and 10 nestling red-tailed hawks were detected this year. Two spotlighting surveys for mule deer were conducted, each over three consecutive nights in October 1999 and August 2000. The mean sighting rate in October was 1.2 deer/10 kilometers (km) and 1.6 deer/10 km in August. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. Pahute Mesa Pond was confirmed to have vegetation,hydrology, and soil indicators that qualify the site as a jurisdictional wetland. The chemical spill test plan for one experiment at the HAZMAT Spill Center was reviewed for its potential to impact biota downwind of spills on Frenchman Lake playa.

  2. Research results from the Ashland Exploration, Inc. Ford Motor Company 78 (ed) well, Pike County, Kentucky. Topical report, April 1992-December 1993

    SciTech Connect (OSTI)

    Hopkins, C.W.; Frantz, J.H.; Lancaster, D.E.

    1995-06-01T23:59:59.000Z

    This report summarizes the work performed on the Ashland Exploration, Inc. Ford Motor Company 78 (Experimental Development (ED)) Well, in Pike County, KY. The ED well was the third well drilled in a research project conducted by GRI in eastern Kentucky targeting both the Devonian Shales and Berea Sandstone. Both the Shales and Berea were completed and tested in the ED well. The primary objective of the ED well was to apply what was learned from studying the Shalers in COOP 1 (first well drilled) and the Berea in COOP 2 (second well drilled) to both the Shales and the Berea in the ED well. Additionally, the ED well was used to evaluate the impact of different stimulation treatments on Shales production. Research in the ED well brings to a close GRI`s extensive field-based research program in the Appalachian Basin over the last ten years.

  3. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    SciTech Connect (OSTI)

    C. A. Wills

    2002-12-01T23:59:59.000Z

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.

  4. Cooperative Research and Development Agreement between the California Air Resources Board and Lockheed Martin Idaho Technologies Company. Final report

    SciTech Connect (OSTI)

    Cole, G.H.

    1998-04-01T23:59:59.000Z

    This report summarizes the activities under a Cooperative Research and Development Agreement (CRADA) between Lockheed-Martin Idaho Technologies Company (LMITCO) and the California Air Resources Board (CARB). The activities were performed at the Idaho National Engineering and Environmental Laboratory (INEEL) between June 1995 and December 1997. Work under this agreement was concentrated in two task areas as defined in the California Air Resources Board`s contract number 94-908 having an approval date of June 9, 1995: Task 1--EV and HEV Vehicle Testing and Assessment and Task 4--Advanced Battery Testing.

  5. Greening of the White House: Six year report

    SciTech Connect (OSTI)

    None

    1999-11-01T23:59:59.000Z

    The White House, which recently celebrated its 200th birthday, has a long tradition of demonstrating technological innovation. In keeping with that tradition, President Clinton announced the Greening of the White House Initiative on Earth Day 1993. The initiative improves the energy and environmental performance of the White House complex by identifying opportunities to reduce waste, lower energy use, and make an appropriate use of renewable resources, all while improving indoor air quality and building comfort. This report on President Clinton's legacy of greening at the White House summarizes progress made to date and gives an overview of new opportunities identified during the past year. It also includes an environmental history of the White House and a short tour of the buildings that make up the White House complex. Over the past five years, this initiative has involved hundreds of dedicated people from both within and outside government. A description of how they worked together to develop and implement the Greening Plan is also included in this report.

  6. Weldon Spring Site Environmental Report for calendar year 1994

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels.

  7. Weldon Spring Site Environmental Report for Calendar Year 1995

    SciTech Connect (OSTI)

    NONE

    1996-06-01T23:59:59.000Z

    This Weldon Spring Site Environmental Report for Calendar Year 1995 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of U.S. Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1995 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios for public use of areas near the site. In addition, release estimates have been calculated on the basis of 1995 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPs) monitoring were below permitted levels.

  8. VACCINE ANNUAL REPORT YEAR 2 Addendum A -Presentations

    E-Print Network [OSTI]

    Ginzel, Matthew

    Extraction Analysis MMM Production Database REST API Report Controller Image Timeline Controller Report List

  9. Sequim Site Radionuclide Air Emissions Report for Calendar Year 2012

    SciTech Connect (OSTI)

    Snyder, Sandra F.; Barnett, J. M.; Gervais, Todd L.

    2013-04-01T23:59:59.000Z

    This report is prepared to document compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and ashington Administrative Code (WAC) Chapter 246-247, Radiation Protection Air Emissions. This report meets the calendar year 2012 Sequim Site annual reporting requirement for its operations as a privately-owned facility as well as its federally-contracted status that began in October 2012. Compliance is indicated by comparing the estimated dose to the maximally exposed individual (MEI) with the 10 mrem/yr Environmental Protection Agency (EPA) standard. The MSL contains only sources classified as fugitive emissions. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The dose to the Sequim Site MEI due to routine operations in 2012 was 9E-06 mrem (9E-08 mSv). No non-routine emissions occurred in 2012. The MSL is in compliance with the federal and state 10 mrem/yr standard.

  10. MACHINE AND FOUNDRY COMPANY

    Office of Legacy Management (LM)

    MACHINE AND FOUNDRY COMPANY kt '- : :' ENGINEERING DIVISIOJ ---. Cl FIELD iRIP ,REP@?T ,' i;:z;zy MEETING REPORT : .I.-.-' Y ::,:I :. &, .I7 ENGINEERING REPORT- : T, ...

  11. Company Company Code Fiscal Year Submission Date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting theCommercialization and Innovation

  12. Nevada Test Site environmental data report for calendar year 1996

    SciTech Connect (OSTI)

    Black, S.C.; Townsend, Y.E. [eds.; Kinnison, R.R.

    1998-03-01T23:59:59.000Z

    US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program,`` establishes environmental protection program requirements, authorities, and responsibilities for DOE operations. These mandates require compliance with applicable federal, state, and local environmental protection regulations. During calendar year (CY) 1996, environmental protection and monitoring programs were conducted at the Nevada Test Site and other DOE Nevada Operations Office (DOE/NV)-managed sites in Nevada and across the US. A detailed discussion of these environmental protection and monitoring programs and summary data and assessments for environmental monitoring results are provided in the DOE/NV Annual Site Environmental Report-1996 (ASER), DOE/NV/11718-137. This document provides summary data results and detailed assessments for the environmental monitoring conducted for all DOE/NV-managed sites in CY1996.

  13. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 1999

    SciTech Connect (OSTI)

    None

    2000-12-01T23:59:59.000Z

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the three KAPL Sites [Knolls Site, Niskayuna, New York; Kesselring Site, West Milton, New York; S1C Site, Windsor, Connecticut] during calendar year 1999 resulted in no significant release of hazardous substances or radioactivity to the environment. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations.

  14. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    SciTech Connect (OSTI)

    NONE

    1997-12-31T23:59:59.000Z

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  15. SP-100 operational life model. Fiscal Year 1990 annual report

    SciTech Connect (OSTI)

    Ewell, R.; Awaya, H.

    1990-12-14T23:59:59.000Z

    This report covers the initial year`s effort in the development of an Operational Life Model (OLM) for the SP-100 Space Reactor Power System. The initial step undertaken in developing the OLM was to review all available documentation from GE on their plans for the OLM and on the degradation and failure mechanisms envisioned for the SP-100. In addition, the DEGRA code developed at JPL, which modelled the degradation of the General Purpose Heat Source based Radioisotope Thermoelectric Generator (GPHS-RTG), was reviewed. Based on the review of the degradation and failure mechanisms, a list of the most pertinent degradation effects along with their key degradation mechanisms was compiled. This was done as a way of separating the mechanisms from the effects and allowing all of the effects to be incorporated into the OLM. The emphasis was on parameters which will tend to change performance as a function of time and not on those that are simply failures without any prior degradation.

  16. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2000

    SciTech Connect (OSTI)

    None

    2001-12-01T23:59:59.000Z

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls Site, Niskayuna, New York and the Kesselring Site, West Milton, New York and site closure activities at the S1C Site, Windsor, Connecticut, continued to have no adverse effect on human health and the quality of the environment during calendar year 2000. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each Site and at off-site background locations. Monitoring programs at the S1C Site were reduced in scope during calendar year 2000 due to completion of site dismantlement activities during 1999.

  17. Argonne National Laboratory Site Environmental Report for Calendar Year 2013

    SciTech Connect (OSTI)

    Davis, T. M. [Argonne National Lab. (ANL), Argonne, IL (United States); Gomez, J. L. [Argonne National Lab. (ANL), Argonne, IL (United States); Moos, L. P. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-02T23:59:59.000Z

    This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2013. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, sustainability efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP-88 Version 3 computer code, was used in preparing this report.

  18. Argonne National Laboratory site environmental report for calendar year 2007.

    SciTech Connect (OSTI)

    Golchert, N. W.; Davis, T. M.; Moos, L. P.; ESH /QA Oversight

    2008-09-09T23:59:59.000Z

    This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2007. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

  19. Argonne National Laboratory Site Environmental report for calendar year 2009.

    SciTech Connect (OSTI)

    Golchert, N. W.; Davis, T. M.; Moos, L. P.

    2010-08-04T23:59:59.000Z

    This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2009. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's (EPA) CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

  20. Argonne National Laboratory site enviromental report for calendar year 2008.

    SciTech Connect (OSTI)

    Golchert, N. W.; Davis, T. M.; Moos, L. P.

    2009-09-02T23:59:59.000Z

    This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2008. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

  1. Argonne National Laboratory site environmental report for calendar year 2006.

    SciTech Connect (OSTI)

    Golchert, N. W.; ESH /QA Oversight

    2007-09-13T23:59:59.000Z

    This report discusses the status and the accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2006. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and Argonne effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, Argonne, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 Version 3 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

  2. Argonne National Laboratory site environmental report for calendar year 2004.

    SciTech Connect (OSTI)

    Golchert, N. W.; Kolzow, R. G.

    2005-09-02T23:59:59.000Z

    This report discusses the accomplishments of the environmental protection program at Argonne National Laboratory (ANL) for calendar year 2004. The status of ANL environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with the progress of environmental corrective actions and restoration projects. To evaluate the effects of ANL operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the ANL site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, on-site groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and ANL effluent water were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups was estimated. Results are interpreted in terms of the origin of the radioactive and chemical substances (i.e., natural, fallout, ANL, and other) and are compared with applicable environmental quality standards. A U.S. Department of Energy dose calculation methodology, based on International Commission on Radiological Protection recommendations and the U.S. Environmental Protection Agency's CAP-88 (Clean Air Act Assessment Package-1988) computer code, was used in preparing this report.

  3. No Company Is An Island

    E-Print Network [OSTI]

    Maddox, A.

    No company is an island. Utilities and their industrial customers are discovering that collaboration can breed opportunity while isolation can lead to ruin. Inter company relationships have changed over recent years and HL&P and its customers...

  4. StreamNet Project : Annual Report Fiscal Year 2008.

    SciTech Connect (OSTI)

    Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

    2008-12-12T23:59:59.000Z

    Fiscal Year 2008 (FY-08) represents a transitional year for the StreamNet project. While the project continued to acquire/update, standardize, georeference and disseminate fish-related data for the state, some tribal and one federal fisheries agencies, it also took on several new initiatives and is anticipating new regional guidance on data needs. Passage of the Columbia Basin Accords caused an administrative change within the project, separating the work done by the Columbia River Inter-Tribal Fish Commission (CRITFC) out to a separate contract with BPA. This will change the structure of the StreamNet contract but not change the relationship with the StreamNet Library or data developed by CRITFC, and will likely increase the availability of tribal data to StreamNet due to increased funding for tribal data efforts. This change will take effect in FY-09. We also expect that data work will be adjusted in the future in response to executive level policy direction in the Columbia Basin based on efforts to establish priorities under a regional data management framework. Data development emphasis was shifted this year to place highest priority on data that support indicators of fish abundance for the focal species covered in the Status of the Resource (SOTR) report, as requested by the Columbia Basin Fish and Wildlife Authority (CBFWA) Data Management Framework Subcommittee. We instituted an XML based web service allowing direct access to data from the project database for CBFWA to update the SOTR report. The project also increased efforts to work with tribal fisheries managers to provide data related assistance and to include tribal data in the StreamNet database. A primary theme this year was exploring means to speed the flow of data. We had ongoing success in our strategic emphasis on increasing automation of data conversion through development of comprehensive database systems within our partner agencies, as outlined in our Vision and Strategic Plan. By assisting development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project's primary means of disseminating fish data, was completely redesigned this year to improve

  5. Annual Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Clayton, Ray E.; Sweeney, Mark D.; Devary, Joseph L.; Hartshorn, Donald C.

    2010-12-27T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During FY 2010, the Hanford Seismic Network recorded 873 triggers on the seismometer system, which included 259 seismic events in the southeast Washington area and an additional 324 regional and teleseismic events. There were 210 events determined to be local earthquakes relevant to the Hanford Site. One hundred and fifty-five earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this fiscal year were a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al. 2009a, 2009b, 2009c, 2010a, 2010b, and 2010c). Most events were considered minor (coda-length magnitude [Mc] less than 1.0) with the largest event recorded on February 4, 2010 (3.0Mc). The estimated depths of the Wooded Island events are shallow (averaging approximately 1.5 km deep) placing the swarm within the Columbia River Basalt Group. Based upon the last two quarters (Q3 and Q4) data, activity at the Wooded Island area swarm has largely subsided. Pacific Northwest National Laboratory will continue to monitor for activity at this location. The highest-magnitude events (3.0Mc) were recorded on February 4, 2010 within the Wooded Island swarm (depth 2.4 km) and May 8, 2010 on or near the Saddle Mountain anticline (depth 3.0 km). This latter event is not considered unusual in that earthquakes have been previously recorded at this location, for example, in October 2006 (Rohay et al. 2007). With regard to the depth distribution, 173 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 18 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 19 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 178 earthquakes were located in known swarm areas, 4 earthquakes occurred on or near a geologic structure (Saddle Mountain anticline), and 28 earthquakes were classified as random events. The Hanford Strong Motion Accelerometer (SMA) network was triggered several times by the Wooded Island swarm events and the events located on or near the Saddle Mountain anticline. The maximum acceleration value recorded by the SMA network during fiscal year 2010 occurred February 4, 2010 (Wooded Island swarm event), approximately 2 times lower than the reportable action level for Hanford facilities (2% g) with no action required.

  6. First Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-03-29T23:59:59.000Z

    The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite interferometry that detected approximately 1 inch uplift in surface deformation along an east-west transect within the swarm area. The uplift is thought to be caused by the release of pressure that has built up in sedimentary layers, cracking the brittle basalt layers with the Columbia River Basalt Formation (CRBG) and causing the earthquakes. Similar earthquake swarms have been recorded near this same location in 1970, 1975 and 1988 but not with SMA readings or satellite imagery. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. The Wooded Island swarm, due its location and the limited magnitude of the events, does not appear to pose any significant risk to Hanford waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will persist or increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity. Outside of the Wooded Island swarm, sixteen earthquakes were recorded, all minor events. Seven earthquakes were located at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments and nine earthquakes at depths greater than 9 km, within the basement. Geographically, seven earthquakes were located in known swarm areas and nine earthquakes were classified as random events.

  7. Model year 2010 Honda insight level-1 testing report.

    SciTech Connect (OSTI)

    Rask, E.; Bocci, D.; Duoba, M.; Lohse-Busch, H. (Energy Systems)

    2011-03-22T23:59:59.000Z

    As a part of the US Department of Energy's Advanced Vehicle Testing Activity (AVTA), a model year 2010 Honda Insight was procured by eTec (Phoenix, AZ) and sent to ANL's Advanced Powertrain Research Facility for the purposes of vehicle-level testing in support of the Advanced Vehicle Testing Activity (AVTA). Data was acquired during testing using non-intrusive sensors, vehicle network information, and facilities equipment (emissions and dynamometer data). Standard drive cycles, performance cycles, steady-state cycles and A/C usage cycles were tested. Much of this data is openly available for download in ANL's Downloadable Dynamometer Database (D3). The major results are shown here in this report. Given the preliminary nature of this assessment, the majority of the testing was done over standard regulatory cycles and seeks to obtain a general overview of how the vehicle performs. These cycles include the US FTP cycle (Urban) and Highway Fuel Economy Test cycle as well as the US06, a more aggressive supplemental regulatory cycle. Data collection for this testing was kept at a fairly high level and includes emissions and fuel measurements from an exhaust emissions bench, high-voltage and accessory current and voltage from a DC power analyzer, and CAN bus data such as engine speed, engine load, and electric machine operation when available. The following sections will seek to explain some of the basic operating characteristics of the MY2010 Insight and provide insight into unique features of its operation and design.

  8. Model year 2010 Ford Fusion Level-1 testing report.

    SciTech Connect (OSTI)

    Rask, E.; Bocci, D.; Duoba, M.; Lohse-Busch, H.; Energy Systems

    2010-11-23T23:59:59.000Z

    As a part of the US Department of Energy's Advanced Vehicle Testing Activity (AVTA), a model year 2010 Ford Fusion was procured by eTec (Phoenix, AZ) and sent to ANL's Advanced Powertrain Research Facility for the purposes of vehicle-level testing in support of the Advanced Vehicle Testing Activity. Data was acquired during testing using non-intrusive sensors, vehicle network information, and facilities equipment (emissions and dynamometer). Standard drive cycles, performance cycles, steady-state cycles, and A/C usage cycles were conducted. Much of this data is openly available for download in ANL's Downloadable Dynamometer Database. The major results are shown in this report. Given the benchmark nature of this assessment, the majority of the testing was done over standard regulatory cycles and sought to obtain a general overview of how the vehicle performs. These cycles include the US FTP cycle (Urban) and Highway Fuel Economy Test cycle as well as the US06, a more aggressive supplemental regulatory cycle. Data collection for this testing was kept at a fairly high level and includes emissions and fuel measurements from an exhaust emissions bench, high-voltage and accessory current/voltage from a DC power analyzer, and CAN bus data such as engine speed, engine load, and electric machine operation. The following sections will seek to explain some of the basic operating characteristics of the MY2010 Fusion and provide insight into unique features of its operation and design.

  9. Hanford Cultural Resources Laboratory annual report for fiscal year 1989

    SciTech Connect (OSTI)

    Chatters, J.C.; Cadoret, N.A.; Minthorn, P.E.

    1990-06-01T23:59:59.000Z

    This report summarizes activities of the Hanford Cultural Resources Laboratory (HCRL) during fiscal year 1989. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966, the Archaeological Resources Protection Act of 1979, and the American Indian Religious Freedom Act of 1978. A major task in FY 1989 was completion and publication of the Hanford Cultural Resources Management Plan, which prioritizes tasks to be undertaken to bring the US Department of Energy -- Richland Operations into compliance with federal statutes, relations, and guidelines. During FY 1989, six tasks were performed. In order of priority, these were conducting 107 cultural resource reviews, monitoring the condition of 40 known prehistoric archaeological sites, assessing the condition of artifact collections from the Hanford Site, evaluating three sites and nominating two of those to the National Register of Historic Places, developing an education program and presenting 11 lectures to public organizations, and surveying approximately 1 mi{sup 2} of the Hanford Site for cultural resources. 7 refs., 4 figs., 4 tabs.

  10. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2001

    SciTech Connect (OSTI)

    NONE

    2002-12-31T23:59:59.000Z

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls and Kesselring Sites and Site closure activities at the S1C Site (also known as the KAPL Windsor Site) continue to have no adverse effect on human health and the quality of the environment. The effluent and environmental monitoring programs conducted by KAPL at the Knolls and Kesselring Sites are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as environmental monitoring of air, water, sediment, and fish. Radiation measurements are also made around the perimeter of the Knolls and Kesselring Sites and at off-site background locations. The environmental monitoring program for the S1C Site continues to be reduced in scope from previous years due to the completion of Site dismantlement activities during 1999 and a return to green field conditions during 2000.

  11. Strategic Petroleum Reserve annual report for calendar year 1998

    SciTech Connect (OSTI)

    NONE

    1998-12-31T23:59:59.000Z

    The Strategic Petroleum Reserve was established in 1975 as an emergency response to the 1973 Arab oil embargo. It is authorized by the Energy Policy and Conservation Act (EPCA), and by the comprehensive energy plans of all Administrations since 1975, in recognition of the long-term dependence of the US on imported crude oil and petroleum products. Section 165 of EPCA requires the Secretary of Energy to submit an Annual Report to the President and the Congress. On May 13, 1998, the Department published a Statement of Administration Policy which reaffirmed its commitment to maintain a Government-owned and controlled, centrally located Strategic Petroleum Reserve of crude oil. The Reserve is to be used solely for responding to the types of severe oil supply interruptions presently contemplated in EPCA. Over the past twenty years, the Reserve has grown as large as 592 million barrels--a peak reached in 1994. From 1994 to 1996, nearly 28 million barrels were sold to raise revenues for the U S Treasury. As of December 31, 1998, the crude oil inventory was 561,108,127 barrels which equated to 60 days of net oil imports during 1998. The US now relies on a combination of both the Reserve and private stocks to meet its oil storage obligations to the International Energy Agency.

  12. West Valley Demonstration Project Site Environmental Report Calendar Year 2000

    SciTech Connect (OSTI)

    NONE

    2001-08-31T23:59:59.000Z

    The annual site environmental monitoring report for the West Valley Demonstration Project nuclear waste management facility.

  13. Second Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-06-30T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 90 local earthquakes during the second quarter of FY 2010. Eighty-one of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter were a continuation of the swarm events observed during the 2009 and 2010 fiscal years and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2010). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (3.0 Mc) occurred February 4, 2010 at depth 2.4 km. The average depth of the Wooded Island events during the quarter was 1.6 km with a maximum depth estimated at 3.5 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford Strong Motion Accelerometer (SMA) network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Similar earthquake swarms have been recorded near this same location in 1970, 1975 and 1988 but not with SMA readings or satellite imagery. Prior to the 1970s, earthquake swarms may have occurred at this location or elsewhere in the Columbia Basin, but equipment was not in place to record those events. The Wooded Island swarm, due its location and the limited magnitude of the events, does not appear to pose any significant risk to Hanford waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will persist or increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity. Outside of the Wooded Island swarm, nine earthquakes were recorded, seven minor events plus two events with magnitude less than 2.0 Mc. Two earthquakes were located at shallow depths (less than 4 km), three earthquakes at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments, and four earthquakes were located at depths greater than 9 km, within the basement. Geographically, six earthquakes were located in known swarm areas and three earthquakes were classified as random events.

  14. Health hazard evaluation report HETA 88-391-2156, Morton Salt Company, Weeks Island, Louisiana. (Revised April 1993)

    SciTech Connect (OSTI)

    Ferguson, R.P.; Knutti, E.B.

    1993-04-01T23:59:59.000Z

    In response to a request from the International Chemical Workers Union, an investigation was made of exposures to asbestos and diesel emissions at the Morton Salt Company, Weeks Island, Louisiana. The most significant source of particulates was diesel exhaust. None of the 20 personal breathing zone or area air samples collected in the mill exceeded limits for asbestos. An increased prevalence of chronic cough and phlegm was reported by workers. More complaints of eye irritation and tearing of the eyes were noted in underground workers, consistent with diesel byproduct exposure. Pulmonary function studies indicated that four workers had mild obstructive lung disease and one had moderate obstructive lung disease. Three workers with mild restriction of lung volume were also noted. None of the 61 chest films taken was positive for pneumoconiosis. The authors conclude that a potential hazard existed from exposure to diesel exhaust.

  15. Endowment Performance, Fiscal Years 1981-2011 Fiscal Year

    E-Print Network [OSTI]

    by the Harvard Management Company, based on reinvestment of all earnings on a monthly basis. (3) Values have beenEndowment Performance, Fiscal Years 1981-2011 Fiscal Year Year-end market value (in 000's) Return REPORTS Market Value of Endowment Funds as of June 30, 2011 Endowment Market Value Market Value % of Total

  16. Third Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-09-29T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 23 local earthquakes during the third quarter of FY 2010. Sixteen earthquakes were located at shallow depths (less than 4 km), five earthquakes at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments, and two earthquakes were located at depths greater than 9 km, within the basement. Geographically, twelve earthquakes were located in known swarm areas, 3 earthquakes occurred near a geologic structure (Saddle Mountain anticline), and eight earthquakes were classified as random events. The highest magnitude event (3.0 Mc) was recorded on May 8, 2010 at depth 3.0 km with epicenter located near the Saddle Mountain anticline. Later in the quarter (May 24 and June 28) two additional earthquakes were also recorded nearly at the same location. These events are not considered unusual in that earthquakes have been previously recorded at this location, for example, in October 2006 (Rohay et al; 2007). Six earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter were a continuation of the swarm events observed during the 2009 and 2010 fiscal years and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, 2010a, and 2010b). All events were considered minor (coda-length magnitude [Mc] less than 1.0) with a maximum depth estimated at 1.7 km. Based upon this quarters activity it is likely that the Wooded Island swarm has subsided. Pacific Northwest National Laboratory (PNNL) will continue to monitor for activity at this location.

  17. Annual Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-12-29T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During fiscal year 2008, the Hanford Seismic Network recorded 1431 triggers on the seismometer system, which included 112 seismic events in the southeast Washington area and an additional 422 regional and teleseismic events. There were 74 events determined to be local earthquakes relevant to the Hanford Site. The highest-magnitude event (3.7 Mc) occurred on May 18, 2008, and was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, 13 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 45 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 16 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 54 earthquakes were located in swarm areas and 20 earthquakes were classified as random events. The May 18 earthquake was the highest magnitude event recorded since 1975 in the vicinity of the Hanford Site (between 46 degrees and 47 degrees north latitude and 119 degrees and 120 degrees west longitude). The event was not reported as being felt on the Hanford Site or causing any damage and was communicated to the Pacific Northwest National Laboratory Operations Center per HSAP communi¬cations procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and 400 Area were triggered by the May 18 event. The maximum acceleration recorded at the SMA stations (0.17% at the 300 Area) was 12 times smaller than the reportable action level (2% g) for Hanford Site facilities.

  18. Third Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-09-01T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, fourteen local earthquakes were recorded during the third quarter of fiscal year 2008. The largest event recorded by the network during the third quarter (May 18, 2008 - magnitude 3.7 Mc) was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, five earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and three earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, eight earthquakes occurred in swarm areas and six earthquakes were classified as random events. The largest event recorded by the network during the third quarter occurred on May 18 (magnitude 3.7 Mc) and was located approximately 17 km east of Prosser at a depth of 20.5 km. This earthquake was the highest magnitude event recorded in the 46-47 N. latitude / 119-120 W. longitude sector since 1975. The May 18 event, not reported as being felt on the Hanford site or causing any damage, was communicated to the PNNL Operations Center per HSAP communications procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and the 400 Area were triggered by the May 18 event. The reportable action level of 2% g for Hanford facilities is approximately 12 times larger than the peak acceleration (0.17%) observed at the 300 Area SMA station and no action was required.

  19. CEMENTITIOUS BARRIERS PARTNERSHIP FY13 MID-YEAR REPORT

    SciTech Connect (OSTI)

    Burns, H.; Flach, G.; Langton, C.; KOSSON, D.; BROWN, K.; SAMSON, E.; MEEUSSEN, J.; SLOOT, H.; GARBOCZI, E.

    2013-05-01T23:59:59.000Z

    In FY2013, the Cementitious Barriers Partnership (CBP) is continuing in its effort to develop and enhance software tools demonstrating tangible progress toward fulfilling the objective of developing a set of tools to improve understanding and prediction of the long?term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In FY2012, the CBP released the initial inhouse “Beta?version” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. The current primary software components are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. THAMES is a planned future CBP Toolbox component (FY13/14) focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. This past November, the CBP Software Toolbox Version 1.0 was released that supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). The CBP issued numerous reports and other documentation that accompanied the “Version 1.0” release including a CBP Software Toolbox User Guide and Installation Guide. These documents, as well as, the presentations from the CBP Software Toolbox Demonstration and User Workshop, which are briefly described below, can be accessed from the CBP webpage at http://cementbarriers.org/. The website was recently modified to describe the CBP Software Toolbox and includes an interest form for application to use the software. The CBP FY13 program is continuing research to improve and enhance the simulation tools as well as develop new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools thru laboratory experiments and analysis of field specimens are ongoing to quantify and reduce the uncertainty associated with performance assessments are ongoing. This mid?year report also includes both a summary on the FY13 software accomplishments in addition to the release of Version 1.0 of the CBP Software Toolbox and the various experimental programs that are providing data for calibration and validation of the CBP developed software. The focus this year for experimental studies was to measure transport in cementitious material by utilization of a leaching method and reduction capacity of saltstone field samples. Results are being used to calibrate and validate the updated carbonation model.

  20. First quarter Hanford seismic report for fiscal year 2000

    SciTech Connect (OSTI)

    DC Hartshorn; SP Reidel; AC Rohay

    2000-02-23T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the US Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The HSN uses 21 sites and the EW uses 36 sites; both networks share 16 sites. The networks have 46 combined data channels because Gable Butte and Frenchman Hills East are three-component sites. The reconfiguration of the telemetry and recording systems was completed during the first quarter. All leased telephone lines have been eliminated and radio telemetry is now used exclusively. For the HSN, there were 311 triggers on two parallel detection and recording systems during the first quarter of fiscal year (FY) 2000. Twelve seismic events were located by the Hanford Seismic Network within the reporting region of 46--47{degree}N latitude and 119--120{degree}W longitude; 2 were earthquakes in the Columbia River Basalt Group, 3 were earthquakes in the pre-basalt sediments, 9 were earthquakes in the crystalline basement, and 1 was a quarry blast. Two earthquakes appear to be related to a major geologic structure, no earthquakes occurred in known swarm areas, and 9 earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the first quarter of FY 2000.

  1. Third Quarter Hanford Seismic Report for Fiscal Year 2000

    SciTech Connect (OSTI)

    DC Hartshorn; SP Reidel; AC Rohay

    2000-09-01T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its con-tractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (E WRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The HSN uses 21 sites and the EWRN uses 36 sites; both networks share 16 sites. The networks have 46 combined data channels because Gable Butte and Frenchman Hills East are three-component sites. The reconfiguration of the telemetry and recording systems was completed during the first quarter. All leased telephone lines have been eliminated and radio telemetry is now used exclusively. For the HSN, there were 818 triggers on two parallel detection and recording systems during the third quarter of fiscal year (FY) 2000. Thirteen seismic events were located by the Hanford Seismic Network within the reporting region of 46-47{degree} N latitude and 119-120{degree} W longitude; 7 were earthquakes in the Columbia River Basalt Group, 1 was an earthquake in the pre-basalt sediments, and 5 were earthquakes in the crystalline basement. Three earthquakes occurred in known swarm areas, and 10 earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the third quarter of FY 2000.

  2. Second Quarter Hanford Seismic Report for Fiscal Year 2000

    SciTech Connect (OSTI)

    DC Hartshorn; SP Reidel; AC Rohay

    2000-07-17T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the US Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The HSN uses 21 sites and the EWRN uses 36 sites; both networks share 16 sites. The networks have 46 combined data channels because Gable Butte and Frenchman Hills East are three-component sites. The reconfiguration of the telemetry and recording systems was completed during the first quarter. All leased telephone lines have been eliminated and radio telemetry is now used exclusively. For the HSN, there were 506 triggers on two parallel detection and recording systems during the second quarter of fiscal year (FY) 2000. Twenty-seven seismic events were located by the Hanford Seismic Network within the reporting region of 46--47{degree} N latitude and 119--120{degree} W longitude; 12 were earthquakes in the Columbia River Basalt Group, 2 were earthquakes in the pre-basalt sediments, 9 were earthquakes in the crystalline basement, and 5 were quarry blasts. Three earthquakes appear to be related to geologic structures, eleven earthquakes occurred in known swarm areas, and seven earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the second quarter of FY 2000.

  3. Ames Laboratory annual site environmental report, calendar year 1996

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    This report summarizes the environmental status of Ames Laboratory for calendar year 1996. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring programs. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies twelve buildings owned by the Department of Energy (DOE). The Laboratory also leases space in ISU owned buildings. Laboratory activities involve less than ten percent of the total chemical use and approximately one percent of the radioisotope use on the ISU campus. In 1996, the Office of Assurance and Assessment merged with the Environment, Safety and Health Group forming the Environment, Safety, Health and Assurance (ESH and A) office. In 1996, the Laboratory accumulated and disposed of wastes under US Environmental Protection Agency (EPA) issued generator numbers. Ames Laboratory submitted a Proposed Site Treatment Plan to EPA in December 1995. This plan complied with the Federal Facilities Compliance Act (FFCA). It was approved by EPA in January 1996. The consent agreement/consent order was issued in February 1996. Pollution awareness, waste minimization and recycling programs, implemented in 1990 and updated in 1994, continued through 1996. Included in these efforts were a waste white paper and green computer paper recycling program. Ames Laboratory also continued to recycle salvageable metal and used oil, and it recovered freon for recycling. All of the chemical and nearly all of the radiological legacy wastes were properly disposed by the end of 1996. Additional radiological legacy waste will be properly disposed during 1997.

  4. Monticello Mill Tailings Site environmental report for calendar year 1992

    SciTech Connect (OSTI)

    Not Available

    1993-05-01T23:59:59.000Z

    This report contains information pertaining to environmental activities conducted during calendar year 1992 at and near the inactive uranium millsite in Monticello, Utah. Environmental activities conducted at the Monticello Mill Tailings Site (MMTS) during 1992 included those associated with remedial action and compliance monitoring. Compliance monitoring consisted of both radiological and nonradiological monitoring of air, surface water, and ground water. Radiological and nonradiological air monitoring at the MMTS included measurements of atmospheric radon, particulate matter, and gamma radiation. Air particulate monitoring for radiological and nonradiological constituents was conducted at one location on and two locations off the millsite with high-volume particulate samplers. The maximum airborne concentrations of radium-226, thorium-230, and total uranium at all locations were several orders of magnitude below the regulatory limits specified by DOE Order 5400.5. Surface water monitoring included water quality measurements within Montezuma Creek. During 1992, maximum levels of selenium; gross alpha, gross beta, total dissolved solids, and iron exceeded their respective state standards in one or more samples collected from upstream, on-site, and downstream locations. Ground-water monitoring was conducted for two aquifers underlying the millsite. The shallow aquifer is contaminated by leached products of uranium mill tailings. During 1992, Uranium Mill Tailings Radiation Control Act and state of Utah ground-water standards for arsenic, barium, nitrate, chromium, lead, selenium, molybdenum, uranium-234 and -238, gross alpha particle activity, and radium-226 and -228 were exceeded in one or more alluvial wells. This well will continue to be sampled to determine if the presence of these constituents was anomalous or if the measurements represented contamination in the aquifer.

  5. First Quarter Seismic Report for Fiscal Year 2006

    SciTech Connect (OSTI)

    Rohay, Alan C.; Reidel, Stephen P.; Hartshorn, Donald C.; Sweeney, Mark D.; Clayton, Ray E.

    2006-09-01T23:59:59.000Z

    This report describes the earthquake data collected from October 2005 to December 2005 from the Hanford Seismic Network

  6. Annual Hanford Seismic Report for Fiscal Year 2006

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Reidel, Stephen P.; Clayton, Ray E.

    2006-12-20T23:59:59.000Z

    This report summarizes the earthquake activity at the Hanford Site a vicinty that occurred during FY 2006

  7. Hanford Seismic Annual Report and Fourth Quarter Report for Fiscal Year 1999

    SciTech Connect (OSTI)

    AC Rohay; DC Hartshorn; SP Reidel

    1999-12-07T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network. (EWRN) consist of 40 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. A major reconfiguration of the HSN was initiated at the end of this quarter and the results will be reported in the first quarter report for next fiscal year (FY2000). For the HSN, there were 390 triggers during the fourth quarter of fiscal year(FY) 1999 on the primary recording system. With the implementation of dual backup systems during the second quarter of the fiscal year and an overall increase observed in sensitivity, a total of 1632 triggers were examined, identified, and processed during this fiscal year. During the fourth quarter, 24 seismic events were located by the HSN within the reporting region of 46 degrees to 47 degrees north latitude and 119 degrees to 120 degrees west longitude 9 were earthquakes in the Columbia River Basalt Group, 2 were earthquakes in the pre-basalt sediments, 10 were earthquakes in the crystalline basement; and 2 were quarry blasts. One earthquake appears to be related to a major geologic structure, 14 earthquakes occurred in known swarm areas, and 7 earthquakes were random occurrences.

  8. Kootenay Lake Fertilization Experiment, Year 15 (North Arm) and Year 3 (South Arm) (2006) Report

    SciTech Connect (OSTI)

    Schindler, E.U.; Sebastian, D.; Andrusak, G.F. [Fish and Wildlife Science and Allocation, Ministry of Environment, Province of British Columbia

    2009-07-01T23:59:59.000Z

    This report summarizes results from the fifteenth year (2006) of nutrient additions to the North Arm of Kootenay Lake and three years of nutrient additions to the South Arm. Experimental fertilization of the lake has been conducted using an adaptive management approach in an effort to restore lake productivity lost as a result of nutrient uptake in upstream reservoirs. The primary objective of the experiment is to restore kokanee (Oncorhynchus nerka) populations, which are the main food source for Gerrard rainbow trout (Oncorhynchus mykiss) and bull trout (Salvelinus confluentus). The quantity of agricultural grade liquid fertilizer (10-34-0, ammonium polyphosphate and 28-0-0, urea ammonium nitrate) added to the North Arm in 2006 was 44.7 tonnes of P and 248.4 tonnes of N. The total fertilizer load added to the South Arm was 257 tonnes of nitrogen; no P was added. Kootenay Lake has an area of 395 km{sup 2}, a maximum depth of 150 m, a mean depth of 94 m, and a water renewal time of approximately two years. Kootenay Lake is a monomictic lake, generally mixing from late fall to early spring and stratifying during the summer. Surface water temperatures generally exceed 20 C for only a few weeks in July. Results of oxygen profiles were similar to previous years with the lake being well oxygenated from the surface to the bottom depths at all stations. Similar to past years, Secchi disc measurements at all stations in 2006 indicate a typical seasonal pattern of decreasing depths associated with the spring phytoplankton bloom, followed by increasing depths as the bloom gradually decreases by the late summer and fall. Total phosphorus (TP) ranged from 2-7 {micro}g/L and tended to decrease as summer advanced. Over the sampling season dissolved inorganic nitrogen (DIN) concentrations decreased, with the decline corresponding to nitrate (the dominant component of DIN) being utilized by phytoplankton during summer stratification. Owing to the importance of epilimnetic nitrate that is required for optimal phytoplankton growth discrete depth water sampling occurred in 2006 to measure more accurately changes in the nitrate concentrations. As expected there was a seasonal decline in nitrate concentrations, thus supporting the strategy of increasing the nitrogen loading in both arms. These in-season changes emphasize the need for an adaptive management approach to ensure the nitrogen to phosphorus (N:P) ratio does not decrease below 15:1 (weight:weight) during the fertilizer application period. Phytoplankton composition determined from the integrated samples (0-20m) was dominated by diatoms, followed by cryptophytes and chrysophytes. The contribution of cryptophytes to total biomass was higher in 2006 than in 2005. Cryptophytes, considered being edible biomass for zooplankton and Daphnia spp., increased in 2006. Phytoplankton in the discrete depth samples (2, 5, 10, 15 and 20m) demonstrated a clear north to south gradient in average phytoplankton density and biomass among the three stations sampled, with highest values at the North Arm station (KLF 2) and lowest values in the most southern station in the South Arm (KLF 7). Populations were dominated by flagellates at all stations and depths in June and July, then dominated by diatoms in August and September in the North and South arms of the lake. There were no large bluegreen (cyanobacteria) populations in either arm of the lake in 2006. Seasonal average zooplankton abundance and biomass in both the main body of the lake and in the West Arm increased in 2006 compared to 2005. Zooplankton density was numerically dominated by copepods and biomass was dominated by Daphnia spp. The annual average mysid biomass data at deep stations indicated that the North Arm of Kootenay Lake was more productive than the South Arm in 2006. Mysid densities increased through the summer and declined in the winter; mean whole lake values remain within prefertilization densities. Kokanee escapement to Meadow Creek declined in 2006 to approximately 400,000 spawners. The Lardeau River escapement also declined wit

  9. Laboratory directed research and development. Annual report, fiscal year 1995

    SciTech Connect (OSTI)

    NONE

    1996-02-01T23:59:59.000Z

    This document is a compilation of the several research and development programs having been performed at the Pacific Northwest National Laboratory for the fiscal year 1995.

  10. Cementitious Barriers Partnership FY2013 End-Year Report

    SciTech Connect (OSTI)

    Flach, G. P. [Savannah River Site (SRS), Aiken, SC (United States); Langton, C. A. [Savannah River Site (SRS), Aiken, SC (United States); Burns, H. H. [Savannah River Site (SRS), Aiken, SC (United States); Smith, F. G. [Savannah River Site (SRS), Aiken, SC (United States); Kosson, D. S. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Brown, K. G. [Vanderbilt University, School of Engineering, Nashville, TN (United States); Samson, E. [SIMCO Technologies, Inc., Quebec (Canada); Meeussen, J. C.L. [Nuclear Research and Consultancy Group (NRG), Petten (The Netherlands); van der Sloot, H. A. [Hans van der Sloot Consultancy, Langedijk (The Netherlands); Garboczi, E. J. [Materials & Construction Research Division, National Institute of Standards and Technology, Gaithersburg, MD (United States)

    2013-11-01T23:59:59.000Z

    In FY2013, the Cementitious Barriers Partnership (CBP) demonstrated continued tangible progress toward fulfilling the objective of developing a set of software tools to improve understanding and prediction of the long?term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In November 2012, the CBP released “Version 1.0” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. In addition, the CBP completed development of new software for the “Version 2.0” Toolbox to be released in early FY2014 and demonstrated use of the Version 1.0 Toolbox on DOE applications. The current primary software components in both Versions 1.0 and 2.0 are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. The CBP Software Toolbox Version 1.0 supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. Version 2.0 includes the additional analysis of chloride attack and dual regime flow and contaminant migration in fractured and non?fractured cementitious material. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). THAMES is a planned future CBP Toolbox component focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. Two CBP software demonstrations were conducted in FY2013, one to support the Saltstone Disposal Facility (SDF) at SRS and the other on a representative Hanford high?level waste tank. The CBP Toolbox demonstration on the SDF provided analysis on the most probable degradation mechanisms to the cementitious vault enclosure caused by sulfate and carbonation ingress. This analysis was documented and resulted in the issuance of a SDF Performance Assessment Special Analysis by Liquid Waste Operations this fiscal year. The two new software tools supporting chloride attack and dual?regime flow will provide additional degradation tools to better evaluate performance of DOE and commercial cementitious barriers. The CBP SRNL experimental program produced two patent applications and field data that will be used in the development and calibration of CBP software tools being developed in FY2014. The CBP software and simulation tools varies from other efforts in that all the tools are based upon specific and relevant experimental research of cementitious materials utilized in DOE applications. The CBP FY2013 program involved continuing research to improve and enhance the simulation tools as well as developing new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools through laboratory experiments and analysis of field specimens are ongoing and will continue into FY2014 to quantify and reduce the uncertainty associated with performance assessments. This end?year report summarizes FY2013 software development efforts and the various experimental programs that are providing data for calibration and validation of the CBP developed software.

  11. Hanford Site Environmental Report for Calendar Year 2002

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

    2003-09-01T23:59:59.000Z

    This report is prepared annually to satisfy the requirements of DOE Orders. The report provides an overview of activities at the Hanford Site during 2002 and demonstrates the site's compliance with applicable federal, state, and local environmental laws, regulations, executive orders, and DOE policies; and to summarize environmental data that characterize Hanford Site environmental management performance. The purpose of the report is to provide useful summary information to members of the public, public officials, regulators, Hanford contractors, and elected representatives.

  12. (Data in kilograms of gallium content unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 2009. One company in Utah

    E-Print Network [OSTI]

    58 GALLIUM (Data in kilograms of gallium content unless otherwise noted) Domestic Production 98% of domestic gallium consumption. About 67% of the gallium consumed was used in integrated and Use: No domestic primary gallium recovery was reported in 2009. One company in Utah recovered

  13. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1998. Two companies in

    E-Print Network [OSTI]

    66 GALLIUM (Data in kilograms of gallium content, unless otherwise noted) Domestic Production A. Kramer [(703) 648-7719, dkramer@usgs.gov, fax: (703) 648-7722] #12;67 GALLIUM Events, Trends and Use: No domestic primary gallium recovery was reported in 1998. Two companies in Oklahoma and Utah

  14. (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2009, clay and shale production was reported in 41 States. About 190 companies

    E-Print Network [OSTI]

    44 CLAYS (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2009, clay and shale production was reported in 41 States. About 190 companies operated approximately 830% drilling mud, 17% foundry sand bond, 14% iron ore pelletizing, and 20% other uses; common clay--57% brick

  15. (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2008, clay and shale production was reported in 41 States. About 190 companies

    E-Print Network [OSTI]

    46 CLAYS (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2008, clay and shale production was reported in 41 States. About 190 companies operated approximately 830% drilling mud, 17% foundry sand bond, 14% iron ore pelletizing, and 20% other uses; common clay--57% brick

  16. EMSL Quarterly Highlights Report: 2nd Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-05-04T23:59:59.000Z

    This report outlines the highlights, staff and user accomplishments, and publications that occured during FY09, 2nd quarter at EMSL.

  17. Sandia National Laboratories Procurement Organization annual report, fiscal year 1994

    SciTech Connect (OSTI)

    Stimak, D.R.

    1995-03-01T23:59:59.000Z

    This report summarizes the purchasing and transportation activities of the Procurement Organization for FY 1994. Activities for both the New Mexico and California locations are included.

  18. Site environmental report for the RMI Titanium Company Extrusion Plant, Ashtabula, Ohio. Annual report, 1 January--31 December 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31T23:59:59.000Z

    This report presents information describing the environmental protection program of the RMI Decommissioning Project (RMIDP), and the data obtained from the implementation of the program in 1993. The program involves ongoing environmental surveillance and monitoring campaigns. The program is conducted based upon guidance from the EPA, NRC, and the DOE. The data obtained from the program are compared with environmental standards and requirements, and highlight significant efforts that have been made to achieve compliance with these standards. This report follows the guidance described in DOE order 5400.1, and presents data on radionuclide and chemical constituents in environmental media at and near the site which include air, surface water, groundwater, soil, and stream sediments. It also describes the potential effects of facility operations on the public. Additionally, this report contains an Environmental Compliance Summary outlining specific environmental compliance activities conducted by RMI.

  19. WELDON SPRING SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 2002

    SciTech Connect (OSTI)

    WASHINGTON GROUP INTERNATIONAL AND JACOBS ENGINEERING GROUP

    2003-05-01T23:59:59.000Z

    This annual report presents a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. This report also presents the status of remedial activities and the results of monitoring activities to assess their impacts on the public and environment.

  20. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment ofLetter Report: I11IG002RTC3 | ofproposalof

  1. Hanford Site Environmental Report for Calendar Year 2009

    SciTech Connect (OSTI)

    Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

    2010-09-01T23:59:59.000Z

    The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

  2. Hanford Site Environmental Report for Calendar Year 2008

    SciTech Connect (OSTI)

    Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

    2009-09-15T23:59:59.000Z

    The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

  3. Hanford Site Environmental Report for Calendar Year 2010

    SciTech Connect (OSTI)

    Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

    2011-07-12T23:59:59.000Z

    The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the Hanford Site; demonstrates the status of the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2011 information is included where appropriate.

  4. Annual site environmental report for calendar year 1989

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    The Western Area Power Administration has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved within 1989 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in fifteen states, this report was written to address the environmental activities in all of the facilities as one ``site.``

  5. Research and Development Report, Fiscial Year 1989-1990.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-08-01T23:59:59.000Z

    Since the 1940s, the Bonneville Power Administrative (BPA), has sought to advance an efficient system to provide the Pacific Northwest region with safe, reliable, and cost-effective electrical power. Research and development (R D) activities support that mission. Each biennium, R D managers issue a digest report of the various programs and activities in each of the technological arenas. The report covers a few projects, considered as yielding particularly significant results, as spotlights. Others are described less fully; in some cases with a simple annotation. The report's divisions correspond to the major categories of R D projects: fish and wildlife, energy resources, and transmission technology. 18 figs., 4 tabs.

  6. Hanford Site Environmental Report for Calendar Year 2007

    SciTech Connect (OSTI)

    Poston, Ted M.; Duncan, Joanne P.; Dirkes, Roger L.

    2008-06-05T23:59:59.000Z

    The Hanford Site environmental report is prepared annually for the U.S. Department of Energy (DOE) in accordance with regulatory requirements. The report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

  7. Annual site environmental report for calendar year 1994

    SciTech Connect (OSTI)

    NONE

    1994-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.``

  8. Combined Fiscal Year (FY) 2002 Annual Performance Report and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2003 Annual Performance Plan More Documents & Publications Annual Performance Plan: IG-APP-005 DOE OIG Strategic Plan Fiscal Years 2003-2008 DOE OIG Strategic Plan Fiscal...

  9. Hanford Site Environmental Report for Calendar Year 2000

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

    2001-09-25T23:59:59.000Z

    This Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts.

  10. Hanford Site Environmental Report for Calendar Year 1999

    SciTech Connect (OSTI)

    Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

    2000-09-28T23:59:59.000Z

    The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts.

  11. Paducah Site Annual Site Environmental Report for Calendar Year...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U. S. Department of Energy Order 231.1A. 1 The data and information contained in this report were collected in accordance with the Paducah Site Environmental Monitoring Plan (LATA...

  12. Five Years: Retrospective and Prospective Hughes: Five years ago when we started this report,

    E-Print Network [OSTI]

    be entitled "Apocalypse Now." The stock markets posted their third straight year of declines, and SITAR depends on the willingness of businesses and investors to take risks. While heroic consumers have kept

  13. Annual Site Environmental Report for Calendar Year 2004

    SciTech Connect (OSTI)

    V. Finley

    2009-03-26T23:59:59.000Z

    This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory's (PPPL) operations. The results of the 2004 environmental surveillance and monitoring program for PPPL's are presented and discussed. The report also summarizes environmental initiatives, assessments, and programs that were undertaken in 2004.

  14. Hanford Site environmental report for calendar year 1996

    SciTech Connect (OSTI)

    Dirkes, R.L.; Hanf, R.W. [eds.] [eds.

    1997-08-01T23:59:59.000Z

    The Hanford Site environmental report is prepared annually to summarize environmental data and information, to describe environmental management performance, to demonstrate the status of compliance with environmental regulations, and to highlight major environmental programs and efforts. The report is written to meet requirements and guidelines of the U.S. Department of Energy (DOE) and to meet the needs of the public. This summary has been written with a minimum of technical terminology.

  15. Annual site environmental report for calendar year 1986

    SciTech Connect (OSTI)

    NONE

    1987-05-01T23:59:59.000Z

    The Western Area Power Administration has established an effective formal environmental protection, auditing, and monitoring program which has been in effect since 1978. This annual site environmental report discusses the significant environmental projects and issues Western was involved with in 1986, and it is written to demonstrate the nature and effectiveness of the environmental protection program. Western has numerous facilities located in 15 states. This report was written to address all the facilities.

  16. Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report

    SciTech Connect (OSTI)

    Wellman, Dawn M.; Johnson, Timothy C.; Smith, Ronald M.; Truex, Michael J.; Matthews, Hope E.

    2011-10-01T23:59:59.000Z

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

  17. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 27 Females 11 YEAR 2013 SES 1 EN 05 1 EN 04 11 NN (Engineering) 8 NQ (ProfTechAdmin) 15 NU (TechAdmin Support) 2 YEAR 2013 American Indian Alaska Native Male...

  18. YEAR

    National Nuclear Security Administration (NNSA)

    96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

  19. YEAR

    National Nuclear Security Administration (NNSA)

    1 YEAR 2014 Males 48 Females 33 PAY PLAN YEAR 2014 SES 1 EJEK 8 EN 04 10 EN 03 1 NN (Engineering) 27 NQ (ProfTechAdmin) 29 NU (TechAdmin Support) 5 YEAR 2014 American Indian...

  20. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2014 Males 18 Females 10 PAY PLAN YEAR 2014 SES 1 EN 05 1 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 9 NU (TechAdmin Support) 1 YEAR 2014 American Indian Alaska...

  1. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2014 Males 61 Females 24 PAY PLAN YEAR 2014 SES 1 EJEK 8 EN 04 22 NN (Engineering) 23 NQ (ProfTechAdmin) 28 NU (TechAdmin Support) 3 YEAR 2014 American Indian Alaska...

  2. YEAR

    National Nuclear Security Administration (NNSA)

    0 YEAR 2013 Males 48 Females 32 YEAR 2013 SES 2 EJEK 7 EN 04 11 EN 03 1 NN (Engineering) 23 NQ (ProfTechAdmin) 33 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    31 YEAR 2013 Males 20 Females 11 YEAR 2013 SES 2 EN 04 4 NN (Engineering) 12 NQ (ProfTechAdmin) 12 NU (TechAdmin Support) 1 YEAR 2013 American Indian Alaska Native Male (AIAN,...

  4. Electronic Resources Use Survey UMass Amherst Libraries RL:May 2010 1 year report

    E-Print Network [OSTI]

    Schweik, Charles M.

    Electronic Resources Use Survey UMass Amherst Libraries RL:May 2010 1 year report Electronic Resources Use Survey ­ 1 Year Results September 2008 ­ August 2009 Resources & the Environment 8 Other 8 College of Engineering 7 School of Public Health & Health

  5. Health hazard evaluation report HETA 96-0137-2607, Yankee Atomic Electric Company, Rowe, Massachusetts

    SciTech Connect (OSTI)

    Sylvain, D.C.

    1996-10-01T23:59:59.000Z

    In response to a request from the Health and Safety Supervisor at the Yankee Nuclear Power Station (SIC-4911), Rowe, Massachusetts, an investigation was begun into ozone (10028156) exposure during plasma arc cutting and welding. Welders had reported chest tightness, dry cough, and throat and bronchial irritation. The nuclear power station was in the process of being decommissioned, and workers were dismantling components using welding and cutting methods. Of the operations observed during the site visit, the highest ozone concentrations were generated during plasma arc cutting, followed by metal inert gas (MIG) welding and arc welding. During plasma arc cutting the average and peak concentrations exceeded the NIOSH ceiling recommended exposure limit of 0.1 part per million. The author concludes that ozone exposure during plasma arc cutting and MIG welding presented a health hazard to welders. The author recommends that improvements be made in the local exhaust ventilation, that nitrogen-dioxide levels be monitored during hot work, and that many exposed workers wear protective clothing, use ultraviolet blocking lotion, and continue the use appropriate shade of eye protection.

  6. Poisonings with Suicidal Intent Aged 0-21 Years Reported to Poison Centers 2003-12

    E-Print Network [OSTI]

    Sheikh, Sophia; Hendry, Phyllis; Lynch, Sean; Kalynych, Colleen; Aldridge, Petra; Kraemer, Dale F

    2015-01-01T23:59:59.000Z

    0-21 Years Reported to Poison Centers 2003-12 Sophia Sheikh,reported to three regional poison control centers from 2003-younger captured by the Poison Information Control Network.

  7. Summary of the Hanford Site Environmental Report for Calendar Year 2004

    SciTech Connect (OSTI)

    Hanf, Robert W.; Morasch, Launa F.; Poston, Ted M.; Dirkes, Roger L.

    2005-09-26T23:59:59.000Z

    This booklet summarizes the information contained in ''Hanford Site Environmental Report for Calendar Year 2004.'' The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of the activities at DOE's Hanford Site.

  8. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    SciTech Connect (OSTI)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30T23:59:59.000Z

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  9. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company. Final report

    SciTech Connect (OSTI)

    Paller, M. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-03-26T23:59:59.000Z

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor`s heat exchangers where temperatures may reach 70{degrees}C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams & Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

  10. First and Second Quarters Hanford Seismic Report for Fiscal Year 2005

    SciTech Connect (OSTI)

    Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.; Sweeney, Mark D.; Clayton, Ray E.

    2004-12-09T23:59:59.000Z

    This report describes the earthquakes that occurred in the Hanford seismic monitoring network during the first and second quarters of Fiscal Year 2005

  11. 300 Area D4 Project Fiscal Year 2010 Building Completion Report

    SciTech Connect (OSTI)

    Skwarek, B. J.

    2011-01-27T23:59:59.000Z

    This report summarizes the deactiviation, decontamination, decommissioning, and demolition activities of facilities in the 300 Area of the Hanford Site in fiscal year 2010.

  12. Annual Report for the OAK Fund, Academic Year 2013-2014

    E-Print Network [OSTI]

    Herbert, Bruce E.

    2015-02-17T23:59:59.000Z

    Annual report (year 1) for the OAK Fund, the funding to support publication fees for open access articles written by Texas A&M faculty....

  13. Annual Report for the OAK Fund, Academic Year 2013-2014 

    E-Print Network [OSTI]

    Herbert, Bruce E.

    2015-02-17T23:59:59.000Z

    Annual report (year 1) for the OAK Fund, the funding to support publication fees for open access articles written by Texas A&M faculty....

  14. Laboratory Directed Research and Development annual report, fiscal year 1997

    SciTech Connect (OSTI)

    NONE

    1998-03-01T23:59:59.000Z

    The Department of Energy Order 413.2(a) establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 413.2, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. DOE Order 413.2 requires that each laboratory submit an annual report on its LDRD activities to the cognizant Secretarial Officer through the appropriate Operations Office Manager. The report provided in this document represents Pacific Northwest National Laboratory`s LDRD report for FY 1997.

  15. Annual site environmental report for calendar year 1997

    SciTech Connect (OSTI)

    NONE

    1997-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. Because Western has over 400 facilities located in 15 states, this report addresses the environmental activities in all the facilities as one site. In March, 1996, Western established a team representing each of the four Regional Offices, the CRSP Customer Service Center and the Corporate Service Office to develop an Environmental Management System based on the guidelines in ISO 14001. The significant environmental projects and issues Western was involved with in 1997 are discussed in this annual site environmental report. This report is written to show the nature and effectiveness of the environmental protection program.

  16. Health-hazard evaluation report MHETA 89-009-1990, Consolidation Coal Company, Humphrey No. 7 Mine, Pentress, West Virginia

    SciTech Connect (OSTI)

    Kullman, G.J.

    1989-09-01T23:59:59.000Z

    An evaluation was made of worker exposure to hydraulic fluid used on the longwall-mining operations at Consolidated Coal Company's Humphrey Number 7 Mine, Pentress, West Virginia. Employees were complaining of headache, eye and throat irritation, congestion, and cough. A particular emulsion oil, Solcenic-3A, was used with water in the mine's hydraulic roof-support system. An analysis of the oil indicated the presence of methyl-isobutyl-carbinol (MIBC), dipropylene glycol, and paraffin hydrocarbons. Personal breathing-zone samples for MIBC were collected from all workers on the longwall mining operation during the two days of the visit. All the analysis indicated concentrations of MIBC below the limit of quantification, which was 0.6 parts per million for an 8 hour sample. These levels were well below the exposure recommendations of the Mine Safety and Health Administration. Exposure to MIBC may be occurring through skin contact with oil through hydraulic line leaks, accidents, and maintenance activity on the hydraulic machines. The report concludes that Solcenic-3A oil constituents in air did not pose a health hazard at the time of the survey.

  17. Strategic petroleum reserve site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    NONE

    1996-05-31T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Included in this report is a description of each site`s environment, an overview of the Strategic Petroleum Reserve (SPR) environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1995. Two of these highlights include decommissioning of 3 the weeks Island facility, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 4.5 million m{sup 3} (30 million barrels) of crude oil inventory at the Bryan Mound and West Hackberry facilities. The decision to decommission the weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Transfer of Weeks Island oil began in November, 1995 with 2.0 million m{sup 3} (12.5 million barrels) transferred by December 31, 1995. Degasifying the crude oil is a major pollution prevention initiative because it will reduce potentially harmful emissions that would occur during oil movements by three or more orders of magnitude. Spills to the environment, another major topic, indicates a positive trend. There were only two reportable oil and three reportable brine spills during 1995, down from a total of 10 reportable spills in 1994. Total volume of oil spilled in 1995 was 56.3 m{sup 3} (354 barrels), and the total volume of brine spilled was 131.1 m{sup 3} (825 barrels). The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to five in 1995. All of the spills were reported to appropriate agencies and immediately cleaned up, with no long term impacts observed.

  18. West Valley Demonstration Project site environmental report calendar year 1998

    SciTech Connect (OSTI)

    NONE

    1999-06-01T23:59:59.000Z

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  19. Hanford Site environmental report for calendar year 1990

    SciTech Connect (OSTI)

    Woodruff, R.K.; Hanf, R.W.; Hefty, M.G.; Lundgren, R.E. (eds.)

    1991-12-20T23:59:59.000Z

    The Hanford Site Environmental Report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. The report also highlights major environmental programs and efforts. The following sections: describe the Hanford Site and its new mission; summarize the status in 1990 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; present information on environmental surveillance and the ground-water protection and monitoring program; and discuss activities to ensure quality.

  20. Annual Site Environmental Report for Calendar Years 2005-2006

    SciTech Connect (OSTI)

    Virginia L. Finley

    2010-01-25T23:59:59.000Z

    Contained in the following report are data for radioactivity in the environment collected and analyzed by Princeton Plasma Physics Laboratory's Princeton Environmental, Analytical, and Radiological Laboratory (PEARL). The PEARL is located on-site and is certified for analyzing radiological and non-radiological parameters through the New Jersey Department of Environmental Protection's Laboratory Certification Program, Certification Number 12471. Non-radiological surface and ground water samples are analyzed by NJDEP certified subcontractor laboratories - QC, Inc. and Accutest Laboratory. To the best of our knowledge, these data, as contained in the "Annual Site Environmental Report for 2005 and 2006," are documented and certified to be correct.

  1. Hanford Site environmental report for calendar year 1991

    SciTech Connect (OSTI)

    Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. (eds.)

    1992-06-01T23:59:59.000Z

    This report of the Hanford Reservation is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. The report also highlights major environmental programs and efforts. The following sections: describe the Hanford Site and its mission; summarize the status in 1991 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; present information on environmental surveillance and the ground-water protection and monitoring program; and discuss activities to ensure quality.

  2. Hanford Site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    Dirkes, R.L.; Hanf, R.W. [eds.] [Pacific Northwest National Lab., Richland, WA (United States)] [eds.; Pacific Northwest National Lab., Richland, WA (United States)

    1996-06-01T23:59:59.000Z

    The Hanford Site Environmental Report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations. It also highlights environmental programs and efforts. It is written to meet reporting requirements and guidelines of DOE and to meet the needs of the public. Individual sections are designed to describe the Hanford Site and its mission, summarize the status in 1995 of compliance, describe the environmental programs, discuss estimated radionuclide exposure to the public from 1995 Hanford activities, present information on effluent monitoring and environmental surveillance (including ground- water protection and monitoring), and discuss activities to ensure quality.

  3. Brookhaven National Laboratory site environmental report for calendar year 1996

    SciTech Connect (OSTI)

    Schroeder, G.L.; Paquette, D.E.; Naidu, J.R.; Lee, R.J.; Briggs, S.L.K.

    1998-01-01T23:59:59.000Z

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1996. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and non-radiological emissions and effluents to the environment.

  4. Pinellas Plant annual site environmental report for calendar year 1993

    SciTech Connect (OSTI)

    Not Available

    1994-06-10T23:59:59.000Z

    Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

  5. West Valley Demonstration Project site environmental report, calendar year 1999

    SciTech Connect (OSTI)

    None Available

    2000-06-01T23:59:59.000Z

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  6. Inert Electrodes Program fiscal year 1988 annual report

    SciTech Connect (OSTI)

    Strachan, D.M.; Marschman, S.C.; Davis, N.C.; Friley, J.R.; Schilling, C.H.

    1989-10-01T23:59:59.000Z

    The Inert Electrodes Program, being conducted by Pacific Northwest Laboratory (PNL), involves improving the Hall-Heroult cells used by the Aluminum Industry for the electrochemical production of aluminum. The PNL research centers on developing more energy efficient, longer-lasting anodes and cathodes and ancillary equipment. Major accomplishments for Fiscal Year 1988 are summarized below. 14 refs., 56 figs., 9 tabs.

  7. Annual site environmental report for calendar year 1996

    SciTech Connect (OSTI)

    NONE

    1996-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program. Western markets power from 56 hydroelectric power generating plants in its service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The significant environmental projects and issues Western was involved with in 1996 are discussed in this report.

  8. Hanford Site environmental report for calendar year 1989

    SciTech Connect (OSTI)

    Jaquish, R.E.; Bryce, R.W. (eds.)

    1990-05-01T23:59:59.000Z

    This report is a summary of the environmental status of the Hanford Site in 1989. It includes descriptions of the Site and its mission, the status of compliance with environmental regulations, planning and activities to accomplish compliance, environmental protection and restoration activities, and environmental monitoring. 97 refs., 67 figs., 14 tabs.

  9. FEMP Fiscal Year 1999 ESPC Business Strategy Development Summary Report

    SciTech Connect (OSTI)

    Mcmordie, Katherine; Hunt, W. D.

    2000-03-03T23:59:59.000Z

    This report summarizes the objectives, activities, products, and recommendations of the ESPC Business Strategy Development project. The objective of this project was to assist DOE FEMP in defining the potential Federal sector market for FEMP-offered alternative financing services with a focus on Super-Energy Savings Performance Contracts (Super-ESPCs).

  10. Brookhaven National Laboratory site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    Naidu, J.R.; Paquette, D.E.; Schroeder, G.L. [eds.] [and others

    1996-12-01T23:59:59.000Z

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and summarizes information about environmental compliance for 1995. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and of a variety of radionuclides and chemical compounds in the ambient air, soil, sewage effluent, surface water, groundwater, fauna, and vegetation were made at the Brookhaven National Laboratory site and at adjacent sites. The report also evaluates the Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment. Areas of known contamination are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement established by the Department of Energy, Environmental Protection Agency and the New York Department of Environmental Conservation. Except for identified areas of soil and groundwater contamination, the environmental monitoring data has continued to demonstrate that compliance was achieved with the applicable environmental laws and regulations governing emission and discharge of materials to the environment. Also, the data show that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public nor to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

  11. Laboratory directed research and development annual report. Fiscal year 1994

    SciTech Connect (OSTI)

    NONE

    1995-02-01T23:59:59.000Z

    The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. This report represents Pacific Northwest Laboratory`s (PNL`s) LDRD report for FY 1994. During FY 1994, 161 LDRD projects were selected for support through PNL`s LDRD project selection process. Total funding allocated to these projects was $13.7 million. Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our {open_quotes}core competencies.{close_quotes} Currently, PNL`s core competencies have been identified as integrated environmental research; process science and engineering; energy systems development. In this report, the individual summaries of LDRD projects (presented in Section 1.0) are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. Projects within the three core competency areas were approximately 91.4 % of total LDRD project funding at PNL in FY 1994. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. Funding allocated to each of these projects is typically $35K or less. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL`s LDRD program, the management process used for the program, and project summaries for each LDRD project.

  12. Brookhaven National Laboratory site environmental report for calendar year 1994

    SciTech Connect (OSTI)

    Naidu, J.R.; Royce, B.A. [eds.

    1995-05-01T23:59:59.000Z

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory`s operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory.

  13. Annual report on contractor work force restructuring, fiscal year 1997

    SciTech Connect (OSTI)

    NONE

    1998-03-01T23:59:59.000Z

    This report summarizes work force restructuring and community transition activities at all sites. It outlines work force restructuring activity for FY 1997, changing separation patterns, cost savings and separation costs, program assessment, activities to mitigate restructuring impacts, community transition activities, status of displaced workers, lessons learned, and emerging issues in worker and community transition. Work force restructuring and community transition activities for defense nuclear sites are summarized, as are work force restructuring activities at non-defense sites.

  14. Annual site environmental report for calendar year 1994

    SciTech Connect (OSTI)

    NONE

    1994-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1994 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site``. In 1994, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of nearly 17,000 miles of transmission lines, 271 substations, 55 hydroelectric power stations, and a coal-fired power plant.

  15. Annual site environmental report for calendar year 1993

    SciTech Connect (OSTI)

    NONE

    1993-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1993 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 States, this report addresses the environmental activities in all the facilities as one ``site``. In 1993, Western provided power to more than 600 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

  16. Annual site environmental report for calendar year 1992

    SciTech Connect (OSTI)

    NONE

    1992-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1992 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. The Department of Energy (DOE) Order 5400.1, Chapter II.4, requires the preparation of an annual site environmental report. Because Western has facilities located in 15 states, this report addresses the environmental activities in all the facilities as one ``site.`` In 1992, Western provided power to 612 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, Federal and State agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provided service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas. Western is responsible for the operation and maintenance of more than 16,450 miles of transmission lines, 268 substations, 51 hydroelectric power plants, and a coal-fired power plant.

  17. Annual site environmental report for calendar year 1991

    SciTech Connect (OSTI)

    NONE

    1991-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. The Department of Energy Order 5400.1, Chapter 2.4, requires the preparation of an annual site environmental report. Because Western has numerous facilities located in 15 states, this report was written to address the environmental activities in all of the facilities as one ``site``. In 1991, Western provided power to 615 wholesale power customers consisting of cooperatives, municipalities, public utility districts, investor-owned utilities, federal and state agencies, irrigation districts, and project use customers. The wholesale power customers, in turn, provide service to millions of retail consumers in the States of California, Nevada, Montana, Arizona, Utah, New Mexico, Texas, North Dakota, South Dakota, Iowa, Colorado, Wyoming, Minnesota, Nebraska, and Kansas.

  18. Annual site environmental report for calendar year 1988

    SciTech Connect (OSTI)

    NONE

    1988-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1988 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,376 miles of transmission lines, 254 substations, and various appurtenant power facilities in the above geographic areas. Western also is responsible for planning, construction, and operation and maintenance of additional Federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service areas. Additionally, Western markets the US entitlement from the large Navajo coal-fired plant near Page, Arizona, and power generated at a wind farm in Wyoming. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  19. Annual site environmental report for calendar year 1991

    SciTech Connect (OSTI)

    NONE

    1991-12-31T23:59:59.000Z

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program which has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1991 are discussed in this annual site environmental report. It is written to demonstrate the nature and effectiveness of the environmental protection program. Western is responsible for the operation and maintenance of 16,664 miles of transmission lines, 265 substations, and various appurtenant power facilities in fifteen central and western states. Western also is responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may be authorized in the future. There is a combined total of 51 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has numerous facilities located in these states, this report was written to address the environmental activities in all of the facilities as one site.

  20. Laboratory directed research and development annual report: Fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1993-01-01T23:59:59.000Z

    The Department of Energy Order DOE 5000.4A establishes DOE's policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this order. Consistent with the Mission Statement and Strategic Plan provided in PNL's Institutional Plan, the LDRD investments are focused on developing new and innovative approaches to research related to our core competencies.'' Currently, PNL's core competencies have been identified as: integrated environmental research; process science and engineering; energy distribution and utilization. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these corecompetencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. The projects described in this report represent PNL's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL's LDRD program and the management process used for the program and project summaries for each LDRD project.

  1. Laboratory directed research and development annual report: Fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1993-01-01T23:59:59.000Z

    The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this order. Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches to research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as: integrated environmental research; process science and engineering; energy distribution and utilization. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these corecompetencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.

  2. LLNL Underground Coal Gasification Project annual report - fiscal year 1984

    SciTech Connect (OSTI)

    Stephens, D.R.; O'Neal, E.M. (eds.)

    1985-06-15T23:59:59.000Z

    The Laboratory has been conducting an interdisciplinary underground coal gasification program since 1974 under the sponsorship of DOE and its predecessors. We completed three UCG tests at the Hoe Creek site near Gillette, Wyoming, during the period 1975 to 1979. Five small field experiments, the large-block tests, were completed from 1981 to 1982 at the exposed coal face in the WIDCO coal mine near Centralia, Washington. A larger test at the same location, the partial-seam CRIP test, was completed during fiscal year 1984. In conjunction with the DOE and an industrial group lead by the Gas Research Institute, we have prepared a preliminary design for a large-scale test at the WIDCO site. The planned test features dual injection and production wells, module interaction, and consumption of 20,000 tons of coal during a hundred-day steam-oxygen gasification. During fiscal year 1984, we documented the large-block excavations. The cavities were elongated, the cavity cross sections were elliptical, and the cavities contained ash and slag at the bottom, char and dried coal above that, and a void at the top. The results from the large-block tests provided enough data to allow us to construct a composite model, CAVSM. Preliminary results from the model agree well with the product-gas chemistry and cavity shape observed in the large-block tests. Other models and techniques developed during the year include a transient, moving-front code, a two-dimensional, reactive-flow code using the method of lines, and a wall-recession-rate model. In addition, we measured the rate of methane decomposition in the hot char bed and developed an engineering rate expression to estimate the magnitude of the methane-decomposition reaction. 16 refs., 30 figs., 1 tab.

  3. Annual Report for the Year 1999-2000

    E-Print Network [OSTI]

    Cambridge University Library

    2000-01-01T23:59:59.000Z

    come from sources outside the University. The bulk of the funding was provided by two very generous private gifts, from Dr Gordon E. Moore ($12.5 million) and from a private donor (Ł6 million), and a further sum of about Ł2 million formed part of a... to the online catalogue. The number of books fetched continues to rise, this year reaching a record, at 125,391. The online book-request system (OBRS) has rapidly become popular with readers, with over two thirds of requests now being received this way...

  4. Mid-year report. [Review of offshore petroleum industry activity

    SciTech Connect (OSTI)

    Not Available

    1983-05-01T23:59:59.000Z

    A mid-year review and forecast for the offshore energy focuses on the impact of energy prices, worldwide drilling, the market for marine transportation, the mobile rig market, the diving industry, construction prospects, and seismic activity. The price of oil is seen as the most influential factor affecting offshore programs being considered for the next 10 yr. The analysis of drilling data indicates the trend for offshore activity will continue to rise, notwithstanding the current rig activity statistics. The growing importance of remotely operated vehicles in the diving industry is noted.

  5. Annual Report for the Year 2004-2005

    E-Print Network [OSTI]

    Cambridge University Library

    2005-01-01T23:59:59.000Z

    the Li brary was a major partic ipant: ‘The Newtonian Moment’ in New York 14 preservation right The High Priest censing the Ark of the Covenant, from Nicholas of Lyra, ‘Postilla litteralis in Vetus et Novum Testamentum’ ( c.1457) in The Cambridge... of the University. In order to carry this recommendation forward, a new temporary post was established by the General Board’s Committee on Libraries, and Ms Lesley Gray, from the Union Catalogue Team, was appointed. The priority during the year has been...

  6. FTCP Annual Report - Calendar Year 2007 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAM FLASH2011-17-OPAMFTCP Annual Plan -

  7. Memorandum of Understanding for Hydropower Two-Year Progress Report

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferApril 1,(EAC) Richard2015 RD WorkshopEnergy On FebruaryTHEStatesTWO-YEAR

  8. Superconductivity program for electric systems, Superconductivity Technology Center, Los Alamos National Laboratory, annual progress report for fiscal year 1997

    SciTech Connect (OSTI)

    Willis, J.O.; Newnam, B.E. [eds.; Peterson, D.E.

    1999-03-01T23:59:59.000Z

    Development of high-temperature superconductors (HTS) has undergone tremendous progress during the past year. Kilometer tape lengths and associated magnets based on BSCCO materials are now commercially available from several industrial partners. Superconducting properties in the exciting YBCO coated conductors continue to be improved over longer lengths. The Superconducting Partnership Initiative (SPI) projects to develop HTS fault current limiters and transmission cables have demonstrated that HTS prototype applications can be produced successfully with properties appropriate for commercial applications. Research and development activities at LANL related to the HTS program for Fiscal Year 1997 are collected in this report. LANL continues to support further development of Bi2223 and Bi2212 tapes in collaboration with American Superconductor Corporation (ASC) and Oxford Superconductivity Technology, Inc. (OSTI), respectively. The tape processing studies involving novel thermal treatments and microstructural characterization have assisted these companies in commercializing these materials. The research on second-generation YBCO-coated conductors produced by pulsed-laser deposition (PLD) over buffer template layers produced by ion beam-assisted deposition (IBAD) continues to lead the world. The applied physics studies of magnetic flux pinning by proton and heavy ion bombardment of BSCCO and YBCO tapes have provided many insights into improving the behavior of these materials in magnetic fields. Sections 4 to 7 of this report contain a list of 29 referred publications and 15 conference abstracts, a list of patent and license activities, and a comprehensive list of collaborative agreements in progress and completed.

  9. Strategic Petroleum Reserve Site Environmental Report for calendar year 1994

    SciTech Connect (OSTI)

    NONE

    1995-05-31T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. The SER, provided annually in accordance with Department of Energy DOE Order 5400.1, serves the public by summarizing monitoring data collected to assess how the Strategic Petroleum Reserve (SPR) impacts the environment. This report (SER) provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a description of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1994. Two of these highlights include decommissioning of the Weeks Island facility (disposition of 73 million barrels of crude oil inventory) as well as the degasification of up to 144 million barrels of crude oil inventory at the Bayou Choctaw, Big Hill, Bryan Mound, and West Hackberry facilities. The decision to decommission the Weeks Island facility is a result of diminishing mine integrity from ground water intrusion. Degasifying the crude oil is required to reduce potentially harmful emissions that would occur during oil movements. With regard to still another major environmental action, 43 of the original 84 environmental findings from the 1992 DOE Tiger Team Assessment were closed by the end of 1994. Spills to the environment, another major topic, indicates a positive trend. Total volume of oil spilled in 1994 was only 39 barrels, down from 232 barrels in 1993, and the total volume of brine spilled was only 90 barrels, down from 370 barrels in 1993. The longer term trend for oil and brine spills has declined substantially from 27 in 1990 down to nine in 1994.

  10. Brookhaven National Laboratory site environmental report for calendar year 1993

    SciTech Connect (OSTI)

    Naidu, J.R.; Royce, B.A. [eds.

    1994-05-01T23:59:59.000Z

    This report documents the results of the Environmental Monitoring Program at BNL and presents summary information about environmental compliance for 1993. To evaluate the effect of BNL operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, ground water and vegetation were made at the BNL site and at sites adjacent to the Laboratory. Brookhaven National Laboratory`s compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions to the environment were evaluated. Among the permitted facilities, two instances, of pH exceedances were observed at recharge basins, possible related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant (STP) to the Peconic River exceeded on five occasions, three for residual chlorine and one each for iron and ammonia nitrogen. The chlorine exceedances were related to a malfunctioning hypochlorite dosing pump and ceased when the pump was repaired. While the iron and ammonia-nitrogen could be the result of disturbances to the sand filter beds during maintenance. The environmental monitoring data has identified site-specific contamination of ground water and soil. These areas are subject to Remedial Investigation/Feasibility Studies (RI/FS) under the Inter Agency Agreement (IAG). Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at BNL are minimal and pose no threat to the public or to the environment. This report meets the requirements of DOE Orders 5484. 1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

  11. Laboratory Directed Research and Development annual report, Fiscal year 1993

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. LDRD includes activities previously defined as ER&D, as well as other discretionary research and development activities not provided for in a DOE program.`` Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as integrated environmental research; process technology; energy systems research. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. The projects are described in Section 2.0. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    SciTech Connect (OSTI)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27T23:59:59.000Z

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  13. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    SciTech Connect (OSTI)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21T23:59:59.000Z

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    SciTech Connect (OSTI)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17T23:59:59.000Z

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  15. YEAR

    National Nuclear Security Administration (NNSA)

    2014 Males 81 Females 45 PAY PLAN YEAR 2014 SES 1 SL 1 EJEK 25 EN 04 26 EN 03 2 NN (Engineering) 23 NQ (ProfTechAdmin) 44 NU (TechAdmin Support) 4 YEAR 2014 American Indian...

  16. YEAR

    National Nuclear Security Administration (NNSA)

    25 Females 10 YEAR 2014 SES 1 EN 04 11 NN (Engineering) 8 NQ (ProfTechAdmin) 13 NU (TechAdmin Support) 2 YEAR 2014 American Indian Alaska Native Male (AIAN M) 0 American Indian...

  17. The AMTEX Partnership. Second quarter report, Fiscal Year 1995

    SciTech Connect (OSTI)

    Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

    1995-03-01T23:59:59.000Z

    The AMTEX Partnership{trademark} is a collaborative research and development program among the US Integrated Textile Industry, the Department of Energy (DOE), the national laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital industry, thereby reserving and creating US jobs. The operations and program management of the AMTEX Partnership is provided by the Program Office. This report is produced by the Program Office on a quarterly basis and provides information on the progress, operations, and project management of the partnership.

  18. Hanford Site Environmental Report for calendar year 1992

    SciTech Connect (OSTI)

    Woodruff, R.K.; Hanf, R.W.; Lundgren, R.E. [eds.

    1993-06-01T23:59:59.000Z

    This report is prepared annually to summarize environmental data and information, describe environmental management performance, and demonstrate the status of compliance with environmental regulations at the Hanford Site. The following sections: describe the Hanford Site and its mission; summarize the status in 1992 of compliance with environmental regulations; describe the environmental programs at the Hanford Site; discuss public dose estimates from 1992 Hanford activities; present information on effluent monitoring and environmental surveillance, including ground-water protection and monitoring, and discuss activities to ensure quality.

  19. Energy Materials Coordinating Committee, fiscal year 1997. Annual technical report

    SciTech Connect (OSTI)

    NONE

    1998-07-31T23:59:59.000Z

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department`s materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. This report summarizes EMaCC activities for FY 1997 and describes the materials research programs of various offices and divisions within the Department.

  20. Fiscal Year 2014 ASCEM Status Report | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy6 FederalofE:FinancingFinding0 Budget-in-Brief2Report4

  1. Transformer requirements for the year 2000. Final report, December 1979

    SciTech Connect (OSTI)

    Not Available

    1980-06-01T23:59:59.000Z

    The principal objective of this program was to determine the design parameters required for transformers of the year 2000. The approach to meeting this objective was to determine the changes which may occur in transmission and distribution systems over the next twenty years, and how these changes might affect design parameters of distribution and power transformers. Emphasis was placed on domestic requirements, although the impact of international practices was factored into the overall requirements for transformers. Possible investigations that could help transformer designers meet the long term technical requirements of future transformers were also identified. The principal conclusions of this study were: 1200 kV transmission could be in service by the late 1980's and it is essential to develop 1200 kV transformers for these systems; transformer manufacturers must be prepared to supply higher MVA ratings at all voltage levels; there will be a strong demand for low-loss, minimum cost transformers; and environmental/safety, reliability, and size reduction considerations will increase in importance. (LLL)

  2. YEAR

    National Nuclear Security Administration (NNSA)

    3 YEAR 2014 Males 59 Females 24 PAY PLAN YEAR 2014 SES 1 EJEK 4 EN 05 3 EN 04 22 EN 03 8 NN (Engineering) 15 NQ (ProfTechAdmin) 27 NU (TechAdmin Support) 3 YEAR 2014 American...

  3. YEAR

    National Nuclear Security Administration (NNSA)

    8 YEAR 2013 Males 62 Females 26 YEAR 2013 SES 1 EJEK 3 EN 05 1 EN 04 28 EN 03 1 NN (Engineering) 25 NQ (ProfTechAdmin) 27 NU (TechAdmin Support) 2 YEAR 2013 American Indian...

  4. YEAR

    National Nuclear Security Administration (NNSA)

    5 YEAR 2013 Males 58 Females 27 YEAR 2013 SES 1 EJEK 4 EN 05 3 EN 04 21 EN 03 8 NN (Engineering) 16 NQ (ProfTechAdmin) 28 NU (TechAdmin Support) 4 YEAR 2013 American Indian...

  5. Annual site environmental report for calendar year 1999

    SciTech Connect (OSTI)

    NONE

    2000-04-14T23:59:59.000Z

    Many State and Federal environmental protection laws and regulations apply to Western. Western facilities are within the jurisdiction of six Environmental Protection Agency (EPA) regions and 17 states. Western's environmental policy statement directs employees to prevent, control, and abate environmental pollution at their facilities, and when possible, enhance the environment. To help assure conformance with all regulatory requirements, and to achieve its pollution prevention goals and objectives, Western is developing an Environmental Management System (EMS). One of the major regulatory impacts on Western continues to be the Toxic Substances Control Act (TSCA) that regulates the use of polychlorinated biphenyls (PCB). Western's policy is to eliminate PCBs from its system wherever economically and operationally possible. This will lessen the impact of PCB regulations on operations and the impact of PCBs on the environment. Executive Order 12856 requires Federal Agencies to comply with the Emergency Planning and Community Right-to-Know Act (EPCRA). As with other DOE elements, Western has been complying with EPCRA since before the Executive Order was issued. To summarize, in 1999, Western's Regional offices implemented programs to notify State and local emergency response entities in accordance with Section 311 and 312 of EPCRA. Chemical inventories indicate that Western does not manufacture, process, or otherwise use reportable quantities of EPCRA Section 313 chemicals so Toxic Release reports were not required.

  6. Pinellas Plant annual site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Lockheed Martin Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high-quality Environmental, Safety and Health Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholders the results of the Pinellas Plant`s environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant for 1995. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1995. As a result of the end of the Department of Energy`s Defense Programs mission (weapons production) on September 30, 1994, considerable changes at the Pinellas Plant are occurring. The Department of Energy`s Environmental Management is now the landlord of the Pinellas Plant to facilitate the plant`s new mission of transition to alternate use in support of economic development and safe shutdown. The Department of Energy sold the Pinellas Plant to the Pinellas County Industry Council in March 1995, and it is leasing back a portion of the plant through September 1997, to complete the safe shutdown and transition activities.

  7. Pinellas Plant Annual Site Environmental Report for calendar year 1994

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    This report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant, in Pinellas County, Florida for 1994. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1994. As a result of the end of Department of Energy Defense Programs mission production on September 30, 1994, considerable changes at the Pinellas Plant occurred. These changes, which included transitioning the plant toward alternate use in support of economic development and safe shutdown, both increased and heightened Environmental, Safety and Health responsibilities. In December 1994, the Department of Energy announced it had reached an agreement to sell the Pinellas Plant to the Pinellas County Industry Council in March 1995. The plant is being leased back by the Department of Energy through September 1997 to complete safe shutdown, reconfiguration, transfer of equipment to other Department of Energy production facilities, and transition to commercial ventures. Permit modifications and transfers will be completed during 1995 to reflect the new ownership by the Pinellas County Industry Council and to include new tenants as needed.

  8. Strategic Petroleum Reserve site environmental report for calendar year 1997

    SciTech Connect (OSTI)

    NONE

    1998-11-01T23:59:59.000Z

    The purpose of this Site Environmental Report (SER) is to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts for the US Department of Energy (DOE) Strategic Petroleum Reserve (SPR). The SER, provided annually in accordance with DOE order 5400.1, serves the public by summarizing monitoring data collected to assess how the SPR impacts the environment. The SER provides a balanced synopsis of non-radiological monitoring and regulatory compliance data and affirms that the SPR has been operating within acceptable regulatory limits. Included in this report is a describe of each site`s environment, an overview of the SPR environmental program, and a recapitulation of special environmental activities and events associated with each SPR site during 1997. Two of these highlights include decommissioning of the Weeks Island site, involving the disposition of 11.6 million m{sup 3} (73 million barrels) of crude oil inventory, as well as the degasification of over 12.6 million m{sup 3} (79.3 million barrels) of crude oil inventory at the Big Hill and Bryan Mound facilities.

  9. BROOKHAVEN NATIONAL LABORATORY SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1994.

    SciTech Connect (OSTI)

    NAIDU,J.R.; ROYCE,B.A.

    1995-05-01T23:59:59.000Z

    This report documents the results of the Environmental Monitoring Program at Brookhaven National Laboratory and presents summary information about environmental compliance for 1994. To evaluate the effect of Brookhaven National Laboratory's operations on the local environment, measurements of direct radiation, and a variety of radionuclides and chemical compounds in ambient air, soil, sewage effluent, surface water, groundwater, fauna and vegetation were made at the Brookhaven National Laboratory site and at sites adjacent to the Laboratory. Brookhaven National Laboratory's compliance with all applicable guides, standards, and limits for radiological and nonradiological emissions and effluents to the environment were evaluated. Among the permitted facilities, two instances of pH exceedances were observed at recharge basins, possibly related to rain-water run-off to these recharge basins. Also, the discharge from the Sewage Treatment Plant to the Peconic River exceeded. on ten occasions, one each for fecal coliform and 5-day Biochemical Oxygen Demand (avg.) and eight for ammonia nitrogen. The ammonia and Biochemical Oxygen Demand exceedances were attributed to the cold winter and the routine cultivation of the sand filter beds which resulted in the hydraulic overloading of the filter beds and the possible destruction of nitrifying bacteria. The on-set of warm weather and increased aeration of the filter beds via cultivation helped to alleviate this condition. The discharge of fecal coliform may also be linked to this occurrence, in that the increase in fecal coliform coincided with the increased cultivation of the sand filter beds. The environmental monitoring data has identified site-specific contamination of groundwater and soil. These areas are subject to Remedial Investigation/Feasibility Studies under the Inter Agency Agreement. Except for the above, the environmental monitoring data has continued to demonstrate that compliance was achieved with applicable environmental laws and regulations governing emission and discharge of materials to the environment, and that the environmental impacts at Brookhaven National Laboratory are minimal and pose no threat to the public or to the environment. This report meets the requirements of Department of Energy Orders 5484.1, Environmental Protection, Safety, and Health Protection Information reporting requirements and 5400.1, General Environmental Protection Programs.

  10. Nuclear Test-Experimental Science: Annual report, fiscal year 1988

    SciTech Connect (OSTI)

    Struble, G.L.; Donohue, M.L.; Bucciarelli, G.; Hymer, J.D.; Kirvel, R.D.; Middleton, C.; Prono, J.; Reid, S.; Strack, B. (eds.)

    1988-01-01T23:59:59.000Z

    Fiscal year 1988 has been a significant, rewarding, and exciting period for Lawrence Livermore National Laboratory's nuclear testing program. It was significant in that the Laboratory's new director chose to focus strongly on the program's activities and to commit to a revitalized emphasis on testing and the experimental science that underlies it. It was rewarding in that revolutionary new measurement techniques were fielded on recent important and highly complicated underground nuclear tests with truly incredible results. And it was exciting in that the sophisticated and fundamental problems of weapons science that are now being addressed experimentally are yielding new challenges and understanding in ways that stimulate and reward the brightest and best of scientists. During FY88 the program was reorganized to emphasize our commitment to experimental science. The name of the program was changed to reflect this commitment, becoming the Nuclear Test-Experimental Science (NTES) Program.

  11. Capital Reporting Company Quadrennial ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Congressional District. Representative Waxman has 6 been a leader in the Congress on health care and 7 environmental issues. He is a primary author of 8 the Clean Air Act...

  12. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    QUADRENNIAL ENERGY REVIEW Infrastructure Constraints Friday, August 8, 2014 Bismarck, North Dakota Bismarck State College National Energy Center of Excellence Bavendick Stateroom...

  13. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    UNITED STATES DEPARTMENT OF ENERGY ***** QUADRENNIAL ENERGY REVIEW ***** PUBLIC STAKEHOLDER MEETING Friday, August 8, 2014 University of Illinois-Chicago Student Center...

  14. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    U.S. Department of Commerce Matthew Shruhan, U.S.-India Business Council 21 Brooke Smith, Nuclear Regulatory Commission Gretchen Smith, DOENNSA 22 Carlton Stoiber, Talisman...

  15. Final report - Sundyne Company

    SciTech Connect (OSTI)

    Long, J.B.

    1994-09-27T23:59:59.000Z

    Solar cookers offer a viable alternative to conventional cooking methods in many areas, and can be an effective tool in the fight against the deforestation and desertification that plague many developing countries. However, there have been numerous obstacles to the successful dissemination of solar cookers in the past. The purpose of this paper is to identify opportunities, review constraints and develop a marketing strategy to disseminate the Sundyne Solar Cooker (SSC) in developing countries.

  16. Capital Reporting Company

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom: UtilizingDepartment62-LNG -First Reportof5

  17. Capital Reporting Company

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom: UtilizingDepartment62-LNG -First Reportof511

  18. Capital Reporting Company

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom: UtilizingDepartment62-LNG -First

  19. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer | National011-03-2010EIS News | 9B.1. ForCTBT

  20. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer | National011-03-2010EIS News | 9B.1. ForCTBT

  1. Naval Reactors Facility environmental monitoring report, calendar year 2001

    SciTech Connect (OSTI)

    NONE

    2002-12-31T23:59:59.000Z

    The results of the radiological and nonradiological environmental monitoring programs for 2001 at the Naval Reactors Facility are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U. S. Environmental Protection Agency and the U. S. Department of Energy.

  2. Naval Reactors Facility Environmental Monitoring Report, Calendar Year 2003

    SciTech Connect (OSTI)

    None

    2003-12-31T23:59:59.000Z

    The results of the radiological and nonradiological environmental monitoring programs for 2003 at the Naval Reactors Facility are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U.S. Environmental Protection Agency and the U.S. Department of Energy.

  3. Controller's 2006 annual report : fiscal year ending September 30, 2006.

    SciTech Connect (OSTI)

    Crooks, Jennifer Shuk-Ian

    2007-02-01T23:59:59.000Z

    I am pleased to present the CFO's FY06 Financial Report for Sandia National Laboratories (SNL). As a contractor to DOE and other government agencies, the bulk of SNL's revenue is from tax dollars. SNL's FY06 total revenue, total expenditures, and total employment levels were slightly below the FY05 record high levels. Throughout FY06, SNL business staff continued to improve SNL's financial stewardship of entrusted taxpayer funds through implementation of best-in-class practices in financial business operations and internal control policies and procedures to ensure compliance with all accounting standards and provide accountability to our customers. Our FY06 efforts focused on process certification and improvement, implementing OMB Circular A-123, achieving assurance activities, implementation of a Financial Management Competency Program throughout SNL, and continuous assessment of trends and emerging issues.

  4. Third Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-09-30T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 771 local earthquakes during the third quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during the January – March 2009 time period and reported in the previous quarterly report (Rohay et al, 2009). The frequency of Wooded Island events has subsided with 16 events recorded during June 2009. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 25 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.2 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest activity and individuals living in homes directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. The Hanford Strong Motion Accelerometer (SMA) network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration value recorded by the SMA network was approximately 3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressure that has built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity.

  5. Inert electrodes program: Fiscal Year 1987 Annual Report

    SciTech Connect (OSTI)

    Koski, O.H.; Marschman, S.C.; Schilling, C.H.; Windisch, C.F.

    1988-12-01T23:59:59.000Z

    The Inert Electrodes Program is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE), Office of Industrial Programs (OIP). The purpose of the program is to develop long-lasting, energy-efficient anodes, cathodes, and ancillary equipment for Hall-Heroult cells used by aluminum industry. The program is divided into three tasks with the following objectives: Inert Anode Development - to improve the energy efficiency of Hall-Heroult cells by development of inert anodes; Stable Cathode Studies - to develop methods for retrofitting Hall-Heroult cells with TiB/sub 2/-based cathode materials; and Sensor Development - to devise sensors to control the chemistry of Hall-Heroult Cells using stable anodes and cathodes. This Inert Electrodes Program annual report highlights the major technical accomplishment of FY 1987. The accomplishments are presented in the following sections: Management, Materials Development and Testing, Materials Evaluation, Stable Cathode Studies, and Sensor Development. 50 refs., 47 figs.

  6. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1995-08-03T23:59:59.000Z

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  7. Sandia National Laboratories, California pollution prevention annual program report for calendar year 2005.

    SciTech Connect (OSTI)

    Farren, Laurie J. (Sandia National Laboratories, Livermore, CA)

    2005-07-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the SNL/CA Pollution Prevention Program for a given calendar year. It functions as supporting documentation to the ''SNL/CA Environmental Management System Program Manual''. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Pollution Prevention Program, one of six programs that supports environmental management at SNL/CA.

  8. Sandia National Laboratories California Environmental Monitoring Program Annual Report for Calendar Year 2005.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2006-02-01T23:59:59.000Z

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 Update program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

  9. Ministry of Training, Colleges and Universities Multi-Year Accountability Agreement Report-Back

    E-Print Network [OSTI]

    -aligned accountability framework that reflects the future directions for the system in 2010 and beyond. The expectationMinistry of Training, Colleges and Universities 1 Multi-Year Accountability Agreement Report-Back University: YORK Year: 2008-09 As noted in the Multi-Year Accountability Agreement for Universities for 2006

  10. Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1996-12-31T23:59:59.000Z

    During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

  11. Weldon Spring, Missouri: Annual environmental monitoring report, calendar year 1987

    SciTech Connect (OSTI)

    Not Available

    1987-01-01T23:59:59.000Z

    Radiological monitoring at the WSS during 1987 measured uranium, Radium-226, and Thorium-230 concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; all long-lived natural series isotopes in air particulates; and external gamma radiation exposure rates. Potential radiation doses to the public were calculated based on assumed exposure periods and the above measurements. Radon concentrations, external gamma exposure rates, and radionuclide concentrations in groundwater and surface water at the site were generally equivalent to previous years' levels. The maximum calculated annual radiation dose to a hypothetically exposed individual at the WSRP and WSCP area was 1 mrem, or 1 percent of the DOE radiation protection standard of 100 mrem. The maximum calculated annual radiation dose to a hypothetically exposed individual at the WSQ was 14 mrem, or about 14 percent of the standard. Thus the WSS currently complies with DOE Off-site Dose Standards. Chemical contamination monitoring at the WSS during 1987 measured nitroaromatics, total organic carbon and the inorganic anions chloride, nitrate, fluoride and sulfate in surface water, groundwater and sediment. 22 refs., 26 figs., 21 tabs.

  12. First Quarter Hanford Seismic Report for Fiscal Year 1999

    SciTech Connect (OSTI)

    DC Hartshorn; SP Reidel; AC Rohay

    1999-05-26T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. They also locate and identify sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consists of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the first quarter of FY99 for stations in the HSN was 99.8%. There were 121 triggers during the first quarter of fiscal year 1999. Fourteen triggers were local earthquakes; seven (50%) were in the Columbia River Basalt Group, no earthquakes occurred in the pre-basalt sediments, and seven (50%) were in the crystalline basement. One earthquake (7%) occurred near or along the Horn Rapids anticline, seven earthquakes (50%) occurred in a known swarm area, and six earthquakes (43%) were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometer during the first quarter of FY99.

  13. First Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-03-15T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. This includes three recently acquired Transportable Array stations located at Cold Creek, Didier Farms, and Phinney Hill. For the Hanford Seismic Network, ten local earthquakes were recorded during the first quarter of fiscal year 2009. All earthquakes were considered as “minor” with magnitudes (Mc) less than 1.0. Two earthquakes were located at shallow depths (less than 4 km), most likely in the Columbia River basalts; five earthquakes at intermediate depths (between 4 and 9 km), most likely in the sub-basalt sediments); and three earthquakes were located at depths greater than 9 km, within the basement. Geographically, four earthquakes occurred in known swarm areas and six earthquakes were classified as random events.

  14. Energy Division progress report, fiscal years 1994--1995

    SciTech Connect (OSTI)

    Moser, C.I. [ed.

    1996-06-01T23:59:59.000Z

    At ORNL, the Energy Division`s mission is to provide innovative solutions to energy and related issues of national and global importance through interdisciplinary research and development. Its goals and accomplishments are described in this progress report for FY 1994 and FY 1995. The Division`s expenditures in FY 1995 totaled 44.9 million. Sixty percent of the divisions work was supported by the US DOE. Other significant sponsors include the US DOT, the US DOD, other federal agencies, and some private organizations. The Division`s programmatic activities cover three main areas: (1) analysis and assessment, (2) transportation systems, and (3) energy use and delivery technologies. Analysis and assessment activities involve energy and resource analysis, preparation of environmental assessments and impact statements, and impact statements, research on emergency preparedness, analysis of energy and environmental needs in developing countries, and transportation analysis. Transportation systems research seeks to improve the quality of both civilian and military transportation efforts. Energy use and delivery technologies focus on building equipment, building envelopes, (walls, roofs, attics, and materials), improvement of energy efficiency in buildings, and electric power systems.

  15. Interagency Geothermal Coordinating Council Annual Report for Fiscal Year 1989

    SciTech Connect (OSTI)

    None

    1990-01-02T23:59:59.000Z

    The U.S. Interagency Geothermal Coordinating Council was a multi-agency group charged with identifying and reducing barriers to geothermal energy development in the U.S. Many of the issues covered related to regulations for and progress in the leasing of Federal lands in the West for power development. The IGCC reports are important sources of historical information. Table 1 lists significant events in the history of use of geothermal energy in the U.S., starting in1884. That is useful for tracking which Federal departments and agencies managed aspects of this work over time. Table 2 gives a complete accounting for all Federal outlays for geothermal energy development for FY 1979 - 1989, including non-DOE outlays. Table 3 shows the status of the U.S. Geothermal Loan Guarantee Program at end of FY 1989: of the $500 million authorized, $285 million was committed to eight projects, and about $40 million had been paid out on project defaults. An additional $101 million had been repaid by the borrowers. (DJE 2005)

  16. Hanford Cultural Resources Laboratory annual report for fiscal year 1993

    SciTech Connect (OSTI)

    Last, G.V.; Wright, M.K.; Crist, M.E.; Cadoret, N.A.; Dawson, M.V.; Simmons, K.A.; Harvey, D.W.; Longenecker, J.G.

    1994-09-01T23:59:59.000Z

    The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Operations Office (DOE-RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Agency of 1979, the Native American Grave Protection and Repatriation Act of 1990, and the American Indian Religious Freedom Act of 1978. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the DOE-RL in compliance with federal statutes, regulations, and guidelines. For FY 1993, these tasks were to: conduct cultural resource reviews pursuant to Section 106 of the NHPA; monitor the condition of known historic properties; identify, recover, and inventory artifacts collected from the Hanford Site; educate the public about cultural resources values and the laws written to protect them; conduct surveys of the Hanford Site in accordance with Section 110 of the NHPA. Research also was conducted as a spin-off of these tasks and is reported here.

  17. Hanford Cultural Resources Laboratory annual report for fiscal year 1992

    SciTech Connect (OSTI)

    Chatters, J.C.; Gard, H.A.; Wright, M.K.; Crist, M.E.; Longenecker, J.G.; O`Neil, T.K.; Dawson, M.V.

    1993-06-01T23:59:59.000Z

    The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site located in southcentral Washington, in a manner consistent with the National Historic Preservation Act Amended 1992 (NBPA), the Archaeological Resources Protection Act of 1979 (ARPA), the Native American Grave Protection and Repatriation Act of 1990 (NAGPRA), and the American Indian Religious Freedom Act of 1978 (AIRFA). The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations, and guidelines. For FY 1992, these tasks were to (1) ensure compliance with NBPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, and (5) conduct a sample archaeological survey of Hanford lands. Research was also conducted as a spin-off of these tasks and is also reported here.

  18. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 1996

    SciTech Connect (OSTI)

    NONE

    1996-12-31T23:59:59.000Z

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) sites are summarized and assessed in this report. The principal function at KAPL sites (Knolls, Kesselring, and Windsor) is research and development in the design and operation of Naval nuclear propulsion plants. The Kesselring Site is also used for the training of personnel in the operation of these plants. The Naval nuclear propulsion plant at the Windsor Site is currently being dismantled. Operations at the three KAPL sites resulted in no significant release of hazardous substances or radioactivity to the environment. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each site and at off-site background locations.

  19. Weldon Spring Site environmental report for calendar year 1997

    SciTech Connect (OSTI)

    NONE

    1998-08-01T23:59:59.000Z

    This report describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring. Comprehensive monitoring indicated that emissions of radiological compounds in airborne and surface water discharges from the Weldon Spring site consisted primarily of Rn-220 gas, isotopes of thorium and radium, and natural uranium. Airborne Rn-220 emissions were estimated to be 42 Ci (1.6E12 Bq), while emissions from a combination of thorium, radium, and natural uranium isotopes to air and surface water were estimated to be 0.018 Ci (6.7E8 Bq), for a total of 25,000 g (25 kg). There was no measurable impact to any drinking water source.

  20. Idaho National Engineering Laboratory site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    Mitchell, R.G.; Peterson, D.; Hoff, D.L.

    1996-08-01T23:59:59.000Z

    This report presents a compilation of data collected in 1995 for the routine environmental surveillance programs conducted on and around the Idaho National Engineering Laboratory (INEL). During 1995, the offsite surveillance program was conducted by the Environmental Science and Research Foundation. Onsite surveillance was performed by Lockheed Idaho Technologies Company (LITCO). Ground-water monitoring, both on and offsite, was performed by the US Geological Survey (USGS). This report also presents summaries of facility effluent monitoring data collected by INEL contractors. This report, prepared in accordance with the requirements in DOE Order 5400.1, is not intended to cover the numerous special environmental research programs being conducted at the INEL by the Foundation, LITCO, USGS, and others.

  1. First Quarter Hanford Seismic Report for Fiscal Year 2001

    SciTech Connect (OSTI)

    Hartshorn, Donald C.; Reidel, Stephen P.; Rohay, Alan C.; Valenta, Michelle M.

    2001-02-27T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. For the HSN, there were 477 triggers during the first quarter of fiscal year (FY) 2001 on the data acquisition system. Of these triggers, 176 were earthquakes. Forty-five earthquakes were located in the HSN area; 1 earthquake occurred in the Columbia River Basalt Group, 43 were earthquakes in the pre-basalt sediments, and 1 was earthquakes in the crystalline basement. Geographically, 44 earthquakes occurred in swarm areas, 1 earthquake was on a major structure, and no earthquakes were classified as random occurrences. The Horse Heaven Hills earthquake swarm area recorded all but one event during the first quarter of FY 2001. The peak of the activity occurred over December 12th, 13th, and 14th when 35 events occurred. No earthquakes triggered the Hanford Strong Motion Accelerometers during the first quarter of FY 2001.

  2. Third Quarter Hanford Seismic Report for Fiscal Year 2005

    SciTech Connect (OSTI)

    Reidel, Steve P.; Rohay, Alan C.; Hartshorn, Donald C.; Clayton, Ray E.; Sweeney, Mark D.

    2005-09-01T23:59:59.000Z

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. For the Hanford Seismic Network, there were 337 triggers during the third quarter of fiscal year 2005. Of these triggers, 20 were earthquakes within the Hanford Seismic Network. The largest earthquake within the Hanford Seismic Network was a magnitude 1.3 event May 25 near Vantage, Washington. During the third quarter, stratigraphically 17 (85%) events occurred in the Columbia River basalt (approximately 0-5 km), no events in the pre-basalt sediments (approximately 5-10 km), and three (15%) in the crystalline basement (approximately 10-25 km). During the first quarter, geographically five (20%) earthquakes occurred in swarm areas, 10 (50%) earthquakes were associated with a major geologic structure, and 5 (25%) were classified as random events.

  3. Second Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-06-26T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, seven local earthquakes were recorded during the second quarter of fiscal year 2008. The largest event recorded by the network during the second quarter (February 3, 2008 - magnitude 2.3 Mc) was located northeast of Richland in Franklin County at a depth of 22.5 km. With regard to the depth distribution, two earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), three earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and two earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, five earthquakes occurred in swarm areas and two earthquakes were classified as random events.

  4. First Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-03-21T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, forty-four local earthquakes were recorded during the first quarter of fiscal year 2008. A total of thirty-one micro earthquakes were recorded within the Rattlesnake Mountain swarm area at depths in the 5-8 km range, most likely within the pre-basalt sediments. The largest event recorded by the network during the first quarter (November 25, 2007 - magnitude 1.5 Mc) was located within this swarm area at a depth of 4.3 km. With regard to the depth distribution, three earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), thirty-six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and five earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, thirty-eight earthquakes occurred in swarm areas and six earth¬quakes were classified as random events.

  5. Hot Dry Rock energy annual report fiscal year 1992

    SciTech Connect (OSTI)

    Winchester, W.W. [ed.; Duchane, D.V.

    1993-04-01T23:59:59.000Z

    Hot Dry Rock technology took a giant leap forward this year as the long-awaited long-term flow test (LTFT) of the Phase 2 HDR reservoir at Fenton Hill got underway. Energy was produced on a twenty-four hour a day basis for a continuous period of nearly four months of steady-state testing. Hot water was brought to the surface at 90--100 gallons per minute (gpm) with temperatures of 180{degrees}C (356{degrees}F) and higher. During that time, the HDR plant achieved an on-line record of 98.8%. Surface temperature measurements and temperature logging deep within the wellbore confirmed that no decline in the average temperature of fluid produced from the reservoir occurred. Tracer experiments indicated that flow paths within the reservoir were undergoing continuous change during the test. Remarkably, it appeared that longer flow paths carried a larger proportion of the flow as the test proceeded, while more direct fluid pathways disappeared or carried a significantly reduced flow. In sum, access to hot rock appeared to improve over the span of the test. Water losses during the test averaged 10--12% and showed a slow long-term decline. These results confirmed what had been previously discovered in static pressurization testing: Water consumption declines significantly during extended operation of an HDR reservoir. In combination with a recent demonstration by the Japanese that water losses can be greatly reduced by the proper placement of multiple production wells, the recent results at Fenton Hill have effectively demonstrated that excessive water consumption should not be an issue for a properly engineered HDR facility at a well chosen site.

  6. Hot Dry Rock energy annual report fiscal year 1992

    SciTech Connect (OSTI)

    Duchane, D.V.; Winchester, W.W.

    1993-04-01T23:59:59.000Z

    Hot Dry Rock technology took a giant leap forward this year as the long-awaited long-term flow test (LTFT) of the Phase II HDR reservoir at Fenton Hill got underway. Energy was produced on a twenty-four hour a day basis for a continuous period of nearly four months of steady-state testing. Hot water was brought to the surface at 90-100 gallons per minute (gpm) with temperatures of 180[degrees]C (356[degrees]F) and higher. During that time, the HDR plant achieved an on-line record of 98.8%. Surface temperature measurements and temperature logging deep within the wellbore confirmed that no decline in the average temperature of fluid produced from the reservoir occurred. Tracer experiments indicated that flow paths within the reservoir were undergoing continuous change during the test. Remarkably, it appeared that longer flow paths carried a larger proportion of the flow as the test proceeded, while more direct fluid pathways disappeared or carried a significantly reduced flow. In sum, access to hot rock appeared to improve over the span of the test. Water losses during the test averaged 10-12% and showed a slow long-term decline. These results confirmed what had been previously discovered in static pressurization testing: Water consumption declines significantly during extended operation of an HDR reservoir. In combination with a recent demonstration by the Japanese that water losses can be greatly reduced by the proper placement of multiple production wells, the recent results at Fenton Hill have effectively demonstrated that excessive water consumption should not be an issue for a properly engineered HDR facility at a well chosen site.

  7. Annual Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-12-31T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During FY 2009, the Hanford Seismic Network recorded nearly 3000 triggers on the seismometer system, which included over 1700 seismic events in the southeast Washington area and an additional 370 regional and teleseismic events. There were 1648 events determined to be local earthquakes relevant to the Hanford Site. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. Recording of the Wooded Island events began in January with over 250 events per month through June 2009. The frequency of events decreased starting in July 2009 to approximately 10-15 events per month through September 2009. Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with 47 events in the 2.0-3.0 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 2.3 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The highest-magnitude event (3.0Mc) occurred on May 13, 2009 within the Wooded Island swarm at depth 1.8 km. With regard to the depth distribution, 1613 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 18 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 17 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 1630 earthquakes were located in swarm areas and 18 earthquakes were classified as random events. The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. However, some Hanford employees working within a few miles of the area of highest activity and individuals living in homes directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. The Hanford Strong Motion Accelerometer (SMA) network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration value recorded by the SMA network was approximately 3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressure that has built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity.

  8. Second Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-07-31T23:59:59.000Z

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded over 800 local earthquakes during the second quarter of FY 2009. Nearly all of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. Most of the events were considered minor (magnitude (Mc) less than 1.0) with 19 events in the 2.0-2.9 range. The estimated depths of the Wooded Island events are shallow (averaging less than 1.0 km deep) with a maximum depth estimated at 1.9 km. This places the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude and the shallowness of the Wooded Island events have made them undetectable to most area residents. However, some Hanford employees working within a few miles of the area of highest activity, and individuals living in homes directly across the Columbia River from the swarm center, have reported feeling some movement. The Hanford SMA network was triggered numerous times by the Wooded Island swarm events. The maximum acceleration values recorded by the SMA network were approximately 2-3 times lower than the reportable action level for Hanford facilities (2% g) and no action was required. The swarming is likely due to pressures that have built up, cracking the brittle basalt layers within the Columbia River Basalt Formation (CRBG). Similar earthquake “swarms” have been recorded near this same location in 1970, 1975 and 1988. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. Quakes of this limited magnitude do not pose a risk to Hanford cleanup efforts or waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will increase in intensity. However, PNNL will continue to monitor the activity continuously. Outside of the Wooded Island swarm, four earthquakes were recorded. Three earthquakes were classified as minor and one event registered 2.3 Mc. One earthquake was located at intermediate depth (between 4 and 9 km, most likely in the pre-basalt sediments) and three earthquakes at depths greater than 9 km, within the basement. Geographically, two earthquakes were located in known swarm areas and two earthquakes were classified as random events.

  9. Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report

    SciTech Connect (OSTI)

    Bechtel Nevada

    2005-03-01T23:59:59.000Z

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

  10. YEAR

    National Nuclear Security Administration (NNSA)

    8 Females 25 PAY PLAN YEAR 2014 SES 1 EJEK 3 EN 05 1 EN 04 25 EN 03 1 NN (Engineering) 25 NQ (ProfTechAdmin) 25 NU (TechAdmin Support) 2 YEAR 2014 American Indian Alaska Native...

  11. Natural gas annual 1992: Supplement: Company profiles

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The data for the Natural Gas Annual 1991 Supplement : Company Profiles are taken from Form EIA-176, (open quotes) Annual Report of Natural and Supplemental Gas Supply and Disposition (close quotes). Other sources include industry literature and corporate annual reports to shareholders. The companies appearing in this report are major interstate natural gas pipeline companies, large distribution companies, or combination companies with both pipeline and distribution operations. The report contains profiles of 45 corporate families. The profiles describe briefly each company, where it operates, and any important issues that the company faces. The purpose of this report is to show the movement of natural gas through the various States served by the 45 large companies profiled.

  12. Natural gas annual 1993 supplement: Company profiles

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

  13. Annual Report of the Integrated Status and Effectiveness Monitoring Program: Fiscal Year 2008

    SciTech Connect (OSTI)

    Terraqua, Inc. (Wauconda, WA)

    2009-07-20T23:59:59.000Z

    This document was created as an annual report detailing the accomplishments of the Integrated Status and Effectiveness Monitoring Program (ISEMP) in the Upper Columbia Basin in fiscal year 2008. The report consists of sub-chapters that reflect the various components of the program. Chapter 1 presents a report on programmatic coordination and accomplishments, and Chapters 2 through 4 provide a review of how ISEMP has progressed during the 2008 fiscal year in each of the pilot project subbasins: the John Day (Chapter 2), Wenatchee/Entiat (Chapter 3) and Salmon River (Chapter 4). Chapter 5 presents a report on the data management accomplishments in 2008.

  14. Deep Vadose Zone–Applied Field Research Initiative Fiscal Year 2012 Annual Report

    SciTech Connect (OSTI)

    Wellman, Dawn M.; Truex, Michael J.; Johnson, Timothy C.; Bunn, Amoret L.; Golovich, Elizabeth C.

    2013-03-14T23:59:59.000Z

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2012.

  15. Summary of the Hanford Site Environmental Report for Calendar Year 2005

    SciTech Connect (OSTI)

    Hanf, Robert W.; Morasch, Launa F.; Poston, Ted M.; Dirkes, Roger L.

    2006-09-28T23:59:59.000Z

    This small booklet provides highlights of the environmental monitoring at the Hanford Site during 2005. It is a summary of the information contained in the larger report: Hanford Site Environmental Monitoring for Calendar Year 2005.

  16. Battelle Energy Alliance, LLC, Continuity Readiness Assurance Report — Fiscal Year 2014

    SciTech Connect (OSTI)

    Brandon C. Stucki; Sherman S. Campbell

    2014-09-01T23:59:59.000Z

    This is a report generated for DOE-ID to summarize accomplishments made by the BEA Continuity of Operations program as a part of BEA Emergency Management at the INL during the past fiscal year.

  17. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997

    SciTech Connect (OSTI)

    none,

    1999-08-13T23:59:59.000Z

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.

  18. Purchasing and Materials Management Organization, Sandia National Laboratories annual report, fiscal year 1993

    SciTech Connect (OSTI)

    Martin, D.R.

    1994-02-01T23:59:59.000Z

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1993. Activities for both the New Mexico and California locations are included.

  19. Annual report procurement and logistics management center Sandia National Laboratories fiscal year 2002.

    SciTech Connect (OSTI)

    Palmer, David L.

    2003-05-01T23:59:59.000Z

    This report summarizes the purchasing and transportation activities of the Procurement and Logistics Management Center for Fiscal Year 2002. Activities for both the New Mexico and California locations are included.

  20. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1998

    SciTech Connect (OSTI)

    none,

    2000-03-20T23:59:59.000Z

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1998.

  1. Industrial-hygiene walk-through survey report of Firestone Synthetic Rubber and Latex Company, Lake Charles, Louisiana

    SciTech Connect (OSTI)

    Fajen, J.M.; Ungers, L.J.

    1986-03-01T23:59:59.000Z

    A walk-through survey was conducted at the Firestone Synthetic Rubber and Latex Company, Lake Charles, Louisiana in July, 1985. The purpose of the survey was to obtain information on the 1,3-butadiene polymer manufacturing process and evaluate exposure potential. Bulk samples of vinylpyridine latex, styrene/butadiene rubber, and polybutadiene rubber were analyzed for residual 1,3-butadiene.

  2. Pacific Northwest National Laboratory Site Environmental Report for Calendar Year 2011

    SciTech Connect (OSTI)

    Duncan, Joanne P.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Stegen, Amanda; Barnett, J. M.; Su-Coker, Jennifer; Moon, Thomas W.; Ballinger, Marcel Y.; Dirkes, Roger L.; Opitz, Brian E.

    2012-09-01T23:59:59.000Z

    The PNNL Site Environmental Report for Calendar Year 2011 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2011 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

  3. 300 Area D4 Project Fiscal Year 2009 Building Completion Report

    SciTech Connect (OSTI)

    B. J. Skwarek

    2010-01-27T23:59:59.000Z

    This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

  4. Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2012

    SciTech Connect (OSTI)

    Duncan, Joanne P.; Ballinger, Marcel Y.; Fritz, Brad G.; Tilden, Harold T.; Stoetzel, Gregory A.; Barnett, J. M.; Su-Coker, Jennifer; Stegen, Amanda; Moon, Thomas W.; Becker, James M.; Raney, Elizabeth A.; Chamness, Michele A.; Mendez, Keith M.

    2013-09-01T23:59:59.000Z

    The PNNL Annual Site Environmental Report for Calendar Year 2012 was prepared pursuant to the requirements of Department of Energy (DOE) Order 231.1B, "Environment, Safety and Health Reporting" to provide a synopsis of calendar year 2012 information related to environmental management performance and compliance efforts. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and orders and environmental management performance.

  5. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR4 YEAR

  6. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR4 YEAR7

  7. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR43 YEAR

  8. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 20144 YEAR

  9. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8 YEAR 2013

  10. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8 YEAR 20138

  11. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8 YEAR 201387

  12. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8 YEAR

  13. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8 YEAR558

  14. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8 YEAR558563

  15. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR85573380 YEAR

  16. YEAR

    National Nuclear Security Administration (NNSA)

    YEAR 2012 2013 SES 2 1 -50.00% EN 05 0 1 100.00% EN 04 4 4 0.00% NN (Engineering) 13 12 -7.69% NQ (ProfTechAdmin) 13 9 -30.77% NU (TechAdmin Support) 1 1...

  17. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    SciTech Connect (OSTI)

    Stenner, Robert D.

    2005-09-28T23:59:59.000Z

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  18. Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory - Calendar Year 1999 Emission Report

    SciTech Connect (OSTI)

    Zohner, S.K.

    2000-05-30T23:59:59.000Z

    This report presents the 1999 calendar year update of the Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory (INEEL). The INEEL Air Emission Inventory documents sources and emissions of nonradionuclide pollutants from operations at the INEEL. The report describes the emission inventory process and all of the sources at the INEEL, and provides nonradionuclide emissions estimates for stationary sources.

  19. Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory - Calendar Year 1998 Emissions Report

    SciTech Connect (OSTI)

    S. K. Zohner

    1999-10-01T23:59:59.000Z

    This report presents the 1998 calendar year update of the Air Emission Inventory for the Idaho National Engineering and Environmental Laboratory (INEEL). The INEEL Air Emission Inventory documents sources and emissions of nonradionuclide pollutants from operations at the INEEL. The report describes the emission inventory process and all of the sources at the INEEL, and provides nonradiological emissions estimates for stationary sources.

  20. School Accountability Report Card Issued Spring 2011 for Academic Year 200910

    E-Print Network [OSTI]

    Russell, Lynn

    School Accountability Report Card Issued Spring 2011 for Academic Year 2009­10 San Diego Unified School District · William Kowba, Superintendent · 4100 Normal Street, San Diego, CA 92103 · www.sandi.net What Is a School Accountability Report Card? Since November 1988, state law has required all public

  1. Argonne National Laboratory-East site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    Golchert, N.W.; Kolzow, R.G. [Environmental Management Operation, Argonne National Lab., IL (United States)

    1996-09-01T23:59:59.000Z

    This report presents the environmental report for the Argonne National Laboratory-East for the year of 1995. Topics discussed include: general description of the site including climatology, geology, seismicity, hydrology, vegetation, endangered species, population, water and land use, and archaeology; compliance summary; environmental program information; environmental nonradiological program information; ground water protection; and radiological monitoring program.

  2. Contract 98, Appendix F self-assessment report for Fiscal Year 2003

    SciTech Connect (OSTI)

    Albert (Editor), Rich

    2003-10-15T23:59:59.000Z

    This report summarizes the Ernest Orlando Lawrence Berkeley National Laboratory internal assessment of Laboratory operational and administrative performance in key support functions for Fiscal Year (FY) 2003. The report provides documentation of ongoing performance-based management and oversight processes required by the Department of Energy (DOE) to monitor, measure, and evaluate Berkeley Lab work.

  3. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 2

    SciTech Connect (OSTI)

    none,

    1993-12-31T23:59:59.000Z

    This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  4. Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006

    SciTech Connect (OSTI)

    Not Available

    2007-03-01T23:59:59.000Z

    The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

  5. Walk-through survey report: Control technology for metal reclamation industries at East Penn Manufacturing Company Inc. , Lyon Station, Pennsylvania

    SciTech Connect (OSTI)

    Hall, R.M.

    1994-08-12T23:59:59.000Z

    A walk through survey was conducted at the East Penn Manufacturing Company (SIC-3341), Lyon Station, Pennsylvania to identify and evaluate potentially effective controls and work practices in the lead (7439921) reclamation industry. The facility was a secondary lead smelter which operated 7 days a week, and recycled about 20,000 batteries a day, primarily automobile batteries. The company employed automation, local exhaust ventilation, partial enclosures, and enclosed ventilation systems in the reverberatory furnace operations, blast furnace operations, and casting and refinery area to reduce employee exposure to lead. The arsenic (7440382) personal exposure time weighted averages ranged from 0.10 to 1.14 microg/cubic m in the industrial battery breaking area and ranged from nondetected to 6.16 microg/cubic m in the alloying/pots area.

  6. Capsule Pipeline Research Center. 3-year Progress report, September 1, 1993--August 31, 1994

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    The Capsule Pipeline Research Center is devoted to performing research in capsule pipelines so that this emerging technology can be developed for early use to transport solids including coal, grain, other agricultural products, solid wastes, etc. Important research findings and accomplishments during the first-three years include: success in making durable binderless coal logs by compaction, success in underwater extrusion of binderless coal logs, success in compacting and extruding coal logs with less than 3% hydrophobic binder at room temperature, improvement in the injection system and the pump-bypass scheme, advancement in the state-of-the-art of predicting the energy loss (pressure drop) along both stationary and moving capsules, demonstrated the effectiveness of using polymer for drag reduction in CLP, demonstrated the influence of zeta potential on coal log fabrication, improved understanding of the water absorption properties of coal logs, better understanding of the mechanism of coal log abrasion (wear), completed a detailed economic evaluation of the CLP technology and compared coal transportation cost by CLP to that by rail, truck and slurry pipelines, and completion of several areas of legal research. The Center also conducted important technology transfer activities including workshops, work sessions, company seminars, involvement of companies in CLP research, issuance of newsletters, completion of a video tape on CLP, and presentation of research findings at numerous national and international meetings.

  7. Company Level Imports Archives

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear21Company Level Imports Company Level

  8. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 2008 A794826 YEAR

  9. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR 2014

  10. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR 201434

  11. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR

  12. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR4

  13. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR43

  14. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR434

  15. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR43417

  16. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874 YEAR434170

  17. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486 YEAR 2012

  18. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486 YEAR

  19. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486 YEAR42

  20. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486 YEAR424

  1. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486 YEAR4247

  2. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486 YEAR42478

  3. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874861 YEAR

  4. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874861 YEAR40

  5. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 200874861 YEAR4096

  6. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486111 YEAR

  7. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 20087486111 YEAR17

  8. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S. 2008748611196 YEAR

  9. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 2014 Males

  10. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 2014 Males16

  11. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 2014

  12. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 20144

  13. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 20144707

  14. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR 201447072540

  15. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR

  16. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8

  17. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8557 563

  18. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8557 56378

  19. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8557 5637831

  20. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8557 56378318

  1. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR8557

  2. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR855733 28

  3. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR855733 280

  4. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR855733 2801

  5. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR855733 280192

  6. YEAR

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilAElectronic Input Options Gary L. Hirsch SNLMaythe Interior U.S.3 YEAR855733

  7. Year

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4 Oil demand Motor444 U.S.Working and.

  8. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 4. Leakage

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Bruni, J.; Crebs, S.; Law, E.

    1993-04-01T23:59:59.000Z

    As part of a study of unaccounted-for gas (UAF) at the Southern California Gas Company (SoCalGas), volume IV of the six-volume set reports on the UAF leakage volumes associated with the transmission and distribution piping systems, each analyzed separately. Unplanned gas releases in SoCalGas distribution and transmission operations contributed approximately 871,900 thousand cubic feet to the 1991 UAF volume. The study indicated that SoCalGas' current leak detection program has been successful in reducing the number of leaks throughout the distribution system, with the sensitive detection equipment finding leaks earlier in their development and reducing the average leakage rate.

  9. Research results from the Ashland Exploration, Inc., Ford Motor Company 80 (COOP 2) well, Pike County, KY. Topical report, October 1991-November 1992

    SciTech Connect (OSTI)

    Frantz, J.H.; Lancaster, D.E.

    1993-04-01T23:59:59.000Z

    The report summarizes the work performed on the Ashland Exploration, Inc. (AEI) Ford Motor Company 80 (COOP 2) well in Pike County, KY. The COOP 2 was the second well in a three-well research project being conducted by GRI in eastern Kentucky targeting both the Devonian Shales and the Berea Sand; the FMC 80 focused on the Berea. The primary objective of the research was to use and transfer technologies developed in GRI`s Tight Gas Sands and Gas Shales programs to evaluate the Berea in Pike Co., KY.

  10. A Novel Approach to Materials Development for Advanced Reactor Systems. Annual Report for Year 1

    SciTech Connect (OSTI)

    Was, G.S.; Atzmon, M.; Wang, L.

    2000-09-28T23:59:59.000Z

    OAK B188 A Novel Approach to Materials Development for Advanced Reactor Systems. Annual Report for Year 1 Year one of this project had three major goals. First, to specify, order and install a new high current ion source for more rapid and stable proton irradiation. Second, to assess the use of chromium pre-enrichment and the combination of cold-work and irradiation hardening in an effort to assess the role of radiation damage in IASCC without the effects of RIS. Third, to initiate irradiation of reactor pressure vessel steel and Zircaloy. Program Achievements for Year One: Progress was made on all 4 tasks in year one.

  11. U.S. Department of Energy fiscal year 1997 annual report

    SciTech Connect (OSTI)

    NONE

    1998-02-01T23:59:59.000Z

    The Government Management Reform Act and the Government Performance and Results Act both have the objective of ensuring that Federal government agencies are accountable to American taxpayers. This report provides a clear accounting of the return on the investment entrusted to the Department of Energy. Unlike previous annual reports prepared by the Department, this report is fashioned along the lines of a corporate report to the shareholders. Not only does this report contain audited financial statements for the fiscal year but it also describes what the shareholders, American taxpayers, received in the way of services and contributions to the important National goals this Administration and the Department have promised to provide. This report provides a progress report on how the Department is serving the country and how they are doing it for much lower cost.

  12. Annual Security Report for 2012Annual Security Report for 2012 Published in the Year 2013

    E-Print Network [OSTI]

    Illinois at Urbana-Champaign, University of

    reported to the University of Illinois police, designated campus security officials as defined under. Springfield Ave., Urbana. All phone numbers use the area code (217) unless otherwise noted. The commitment

  13. Energy Extension Service Pilot Program: evaluation report after two years. Volume I. Evaluation summary

    SciTech Connect (OSTI)

    None

    1980-04-01T23:59:59.000Z

    The EES pilot program was initiated in August 1977, when 10 states were selected on a competitive basis for participation. The pilot states (Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming) devoted the first 6 months to start-up activities. This document is a follow-up report to the three volume Evaluation Summary of the first year of the pilot EES program published in September 1979. The purpose of this report is to provide an overview of the impacts and costs of the two years of the pilot program, and to check the consistency of findings over the two year period. The analysis addresses the following: (1) were the impact findings of Year I and Year II consistent, or did Year I and Year II attitudes and behavior vary. If variation existed, could it be attributed to program changes as the EES progressed from a start-up phase (Year I) to more normal service delivery (Year II); and (2) did costs of service delivery change (again reflecting start-up and normal service delivery costs). Did cost changes affect conclusions about the relative cost effectiveness of delivering services to different target audiences.

  14. New Business Opportunity Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    report and analysis Company Description: A billion dollar, middle market private equity firm. We just trading and transaction comps from relevant databases. Assist in valuing new deals and marking to market organization of radiant heating

  15. UNDERSTANDING OUR COMPANY AN IBM PROSPECTUS

    E-Print Network [OSTI]

    a company or planned venture so that individuals can make informed decisions. Fully understanding the future lay in consolidation, and chose to bulk up. And then some companies just concluded that their core confidence in IBM's future. We have done much in recent years to transform our company. In a number

  16. Chief Financial Officer FY 1997 status report and five-year plan

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

  17. Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC

    2009-12-01T23:59:59.000Z

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0).

  18. Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reports Reports Individual Permit reports are prepared annually to facilitate public review of activities for the previous year. Contact Environmental Communication & Public...

  19. National Emission Standards for Hazardous Air Pollutants—Calendar Year 2012 INL Report for Radionuclides (2013)

    SciTech Connect (OSTI)

    Mark Verdoorn; Tom Haney

    2013-06-01T23:59:59.000Z

    This report documents the calendar year 2011 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy’s Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, “Protection of the Environment,” Part 61, “National Emission Standards for Hazardous Air Pollutants,” Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.” The effective dose equivalent to the maximally exposed individual member of the public was 4.58E-02 mrem per year, 0.46 percent of the 10 mrem standard.

  20. National Emission Standards for Hazardous Air Pollutants—Calendar Year 2013 INL Report for Radionuclides (2014)

    SciTech Connect (OSTI)

    Mark Verdoorn; Tom Haney

    2014-06-01T23:59:59.000Z

    This report documents the calendar year 2011 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy’s Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, “Protection of the Environment,” Part 61, “National Emission Standards for Hazardous Air Pollutants,” Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.” The effective dose equivalent to the maximally exposed individual member of the public was 4.58E-02 mrem per year, 0.46 percent of the 10 mrem standard.

  1. National Emission Standards for Hazardous Air Pollutants—Calendar Year 2011 INL Report for Radionuclides (2012)

    SciTech Connect (OSTI)

    Mark Verdoorn; Tom Haney

    2012-06-01T23:59:59.000Z

    This report documents the calendar year 2011 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy's Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, 'Protection of the Environment,' Part 61, 'National Emission Standards for Hazardous Air Pollutants,' Subpart H, 'National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.' The effective dose equivalent to the maximally exposed individual member of the public was 4.58E-02 mrem per year, 0.46 percent of the 10 mrem standard.

  2. Investment companies

    E-Print Network [OSTI]

    Sauer, Edward F

    1961-01-01T23:59:59.000Z

    stockholder challenged the management fee paid to F. Eberstadt & Co. , Inc. , manager and distributor of Chemical Fund. The court dismissed the case on the grounds that excessive fees had not been proved. This case, however, could hardly be considered a... Tax-Exempt Bond Funds. . . . . . . . Daily Pricing of Mutual Investment Company Shares. 56 57 59 59 60 iv Management Fees. . . . . Tax-Free Exchange Funds . 61 62 V. CONCLUSIONS 63 BIBLIOGRAPHY GLOSSARY OF TERMS Balanced fund...

  3. Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

  4. In-depth survey report: Control technology for metal reclamation industries at East Penn Manufacturing Company Inc., Lyon Station, Pennsylvania

    SciTech Connect (OSTI)

    Hall, R.M.; Earnest, G.S.; Jensen, P.A.; Zimmer, A.T.

    1996-06-03T23:59:59.000Z

    In an effort to identify effective hazard control methods and work practices, an in depth evaluation was conducted at the East Penn Manufacturing Company Inc. (SIC-3341), Lyon Station, Pennsylvania, which had previously been identified as having the lowest air lead (7439921) concentrations in lead smelter areas during a previous survey. This facility was primarily involved in lead reclamation from recycled automobile and industrial batteries. Control methods employed included automation, local exhaust ventilation, partial enclosures, and enclosed ventilation systems in the reverberatory and blast furnaces, and in casting and refinery areas. Employees in production areas also wore filtered half mask respirators, adhered to strict company policies on personal hygiene, and participated in incentive programs designed to reduce blood lead levels and encourage good personal hygiene and work practices. The authors noted that there was a potential for significant lead exposure in the blast furnace area, reverberatory furnace area, refinery area, and front end load operations. The authors recommend that efforts be made to improve controls in these areas.

  5. Annual Site Environmental Report of the Lawrence Berkeley Laboratory, Calendar year 1992

    SciTech Connect (OSTI)

    Balgobin, D.A.; Javandel, I.; Pauer, R.O.; Schleimer, G.E.; Thorson, P.A. [eds.

    1993-05-01T23:59:59.000Z

    This Annual Site Environmental Report summarizes LBL environmental activities in calendar year (CY) 1992. The purpose of this Report is to present summary environmental information in order to characterize site environmental management performance, confirm compliance with environmental standards and requirements, and highlight significant programs and efforts. Its format and content are consistent with the requirements of the US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program.``

  6. National Emission Standards for Hazardous Air Pollutants—Calendar Year 2010 INL Report for Radionuclides (2011)

    SciTech Connect (OSTI)

    Mark Verdoorn; Tom Haney

    2011-06-01T23:59:59.000Z

    This report documents the calendar Year 2010 radionuclide air emissions and resulting effective dose equivalent to the maximally exposed individual member of the public from operations at the Department of Energy's Idaho National Laboratory Site. This report was prepared in accordance with the Code of Federal Regulations, Title 40, 'Protection of the Environment,' Part 61, 'National Emission Standards for Hazardous Air Pollutants,' Subpart H, 'National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.'

  7. U.S. Nuclear Regulatory Commission accountability report, fiscal year 1995. Volume 1

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The US Nuclear Regulatory Commission (NRC) is one of six Federal agencies participating in a pilot project to streamline financial management reporting. The goal of this pilot is to consolidate performance-related reporting into a single accountability report. The project, which is being carried out under the guidance of the Chief Financial Officers Council, was undertaken in accordance with the Government Management Reform Act (GMRA) of 1994. The GMRA permits the streamlining of financial management reports in consultation with the appropriate Congressional Committees through a liaison in the US Office of Management and Budget (OMB). The results of the pilot project will determine the method to be used for reporting financial management information for fiscal year (FY) 1996. This report consolidates the information previously reported in the following documents: (1) the NRC`s annual financial statement required by the Chief Financial Officers Act of 1990; (2) the Chairman`s annual report to the President and the Congress, required by the Federal Managers` Financial Integrity Act of 1982; (3) the Chairman`s semiannual report to the Congress on management decisions and final actions on Office of Inspector General audit recommendations, required by the Inspector General Act of 1978, as amended. This report also includes performance measures, as required by the Chief Financial Officers Act of 1990.

  8. The Office of Environmental Management Technical Reports: A Bibliography. Fiscal Year 1999

    SciTech Connect (OSTI)

    none

    2000-08-01T23:59:59.000Z

    The Department of Energy's Office of Environmental Management's (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management. This bibliography contains citations for reports published in Fiscal Year 1999 (October 1, 1998 - September 30, 1999). EM's Office of Science and Technology (OST) sponsors this bibliography that covers EM's activities in environmental restoration, waste management, technology development, and facility transition and management. Subjects include subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations.

  9. Corporate intellectual capital reporting: the case of Germany 

    E-Print Network [OSTI]

    Zerr, Viktoria

    2013-11-26T23:59:59.000Z

    This study investigates potential motivations for intellectual capital (IC) reporting in management reports of 428 German companies for the accounting year 2010. To infer motivations, agency theory and legitimacy theory ...

  10. Public health assessment for Reynolds Metals Company, Troutdale, Multnomah County, Oregon, Region 10. Cerclis No. ORD009412677. Final report

    SciTech Connect (OSTI)

    NONE

    1997-01-14T23:59:59.000Z

    The Reynolds Metals Company in Troutdale, Oregon, is a primary aluminum plant. When operating, the plant produced wastes that were contaminated with aluminum, mercury, fluoride, polynuclear aromatic hydrocarbons (PAHs), polychlorinated biphenyls (PCBs), and cyanide. Studies are currently underway to determine the extent of environmental contamination and subsequent clean-up efforts which will be required. People may be exposed to contaminated soils and sediments in the area bordering the Columbia and Sandy rivers. Contamination at the site may have contributed to contamination of fish in the Columbia River, although it is difficult to determine what effect the site may have. Workers at the Reynolds site may also be exposed to contaminated soils and sediments, particularly those workers who are involved in outdoor activities.

  11. YEAR PROGRESS REPORT TITLE: Global Modeling of Tropospheric Aerosols and Their Contribution to Climate Variation

    E-Print Network [OSTI]

    as CCN would cool the climate system by about ­1.16 W m-2 , while carbonaceous aerosols from fossil fuel combustion acting alone may cool the system by about ­0.52 W m-2 (see Table 1). However, because-1- GACP 2nd YEAR PROGRESS REPORT TITLE: Global Modeling of Tropospheric Aerosols

  12. Fiscal Year 2007 Annual Report Integrated Ocean Drilling Program U.S. Implementing Organization

    E-Print Network [OSTI]

    INDIAN OCEAN PACIFIC OCEAN ATLANTIC OCEAN ARCTIC OCEAN SOUTHERN OCEAN 0° 120°E 150° 87°30' 88°00' N M0001Fiscal Year 2007 Annual Report Integrated Ocean Drilling Program · U.S. Implementing Organization­M0004 180° ESO USIO IODP Phase 1 Drill Sites, Expeditions 301­312 #12;Integrated Ocean Drilling

  13. Preliminary report on: The coastal ecosystems 10 years after the 1991 Gulf War

    E-Print Network [OSTI]

    Damm, Bodo

    Preliminary report on: The coastal ecosystems 10 years after the 1991 Gulf War oil spill by Dr-joerg.barth@geographie.uni-regensburg.de Abstract: In 1991 the Gulf War lead to the largest oil spill in human history. Over 700 km of coastline size analysis war carried out at the Jubail Marine Wildlife Sanctuary centre. Carbonate content

  14. Stable dynamics in a Greenland tidewater glacier over 26 years despite reported thinning

    E-Print Network [OSTI]

    Huybrechts, Philippe

    , there is potential for the grounding line to retreat, for calving rates to increase and for the glacier to accelerateStable dynamics in a Greenland tidewater glacier over 26 years despite reported thinning Suzanne L glacier terminating in the northwest corner of the Scoresby Sund fjords. We present a time series

  15. 242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade

    SciTech Connect (OSTI)

    TEATS, M.C.

    1999-08-31T23:59:59.000Z

    242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the acceptance test results for the Evaporator facility.

  16. Materials Corrosion and Mitigation Strategies for APT: End of Year Report, FY '96

    E-Print Network [OSTI]

    Materials Corrosion and Mitigation Strategies for APT: End of Year Report, FY '96 R. Scott Lillard, Darryl P. Butt Materials Corrosion and Environmental Effects Laboratory MST-6, Metallurgy Los Alamos accomplishment in FY '96 was the design and fabrication of the corrosion probes to be used "In Beam" during

  17. CAMBRIDGE UNIVERSITY LIBRARY ANNUAL REPORT FOR THE YEAR 2011-2012

    E-Print Network [OSTI]

    Steiner, Ullrich

    in overseeing the direction of the Library and to reflect modern terminology in relation to digital access will be available only in digital format, the Library will move from an acquisitions model based on recurrent costs#12;CAMBRIDGE UNIVERSITY LIBRARY ANNUAL REPORT FOR THE YEAR 2011-2012 Cambridge University Library

  18. OKLAHOMA 4-H ANNUAL REPORT 2008 The Four H's for 99 Years.

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    OKLAHOMA 4-H ANNUAL REPORT · 2008 The Four H's for 99 Years. HEAD. HEART. HANDS. HEALTH. #12;Question: I'd like to plan now to leave a gift to the Oklahoma 4-H Program upon my passing. What do I need(suchasafarm,residence,vacationhome,orvacantlot) ·orapercentageofyouroverallestatethatwillgototheOklahoma4-HFounda- tiontobenefittheOklahoma4-HProgram. 3.YoucannametheOklahoma4

  19. Mathematics and Physics of Anderson Localization: 50 years after Final Report

    E-Print Network [OSTI]

    Mathematics and Physics of Anderson Localization: 50 years after Final Report Organizers: Professor Y. V. Fyodorov (Nottingham), Professor I. Goldsheid (Queen Mary, Lon- don), Professor T. Spencer seminal paper "Absence of diffusion in certain random lattices" (1958) Philip W. Anderson discovered one

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    SciTech Connect (OSTI)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16T23:59:59.000Z

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    SciTech Connect (OSTI)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17T23:59:59.000Z

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    SciTech Connect (OSTI)

    Rendall, John D. [CH2M HILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& W West Valley, LLC (CHBWV)

    2013-09-19T23:59:59.000Z

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    SciTech Connect (OSTI)

    CH2M HILL • B& W West Valley, LLC

    2012-09-27T23:59:59.000Z

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    SciTech Connect (OSTI)

    CH2MHILL • B& W West Valley, LLC

    2011-09-28T23:59:59.000Z

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  5. Superfund Record of Decision (EPA Region 2): Marathon Battery Company site, Cold Spring, Putnam County, New York, September 1986. Final report

    SciTech Connect (OSTI)

    Not Available

    1986-09-30T23:59:59.000Z

    The Marathon Battery Company (MBC) site, located in the Village of Gold Spring, Putnam County, NY, has two components: the East Foundry Cove Marsh (EFCM), and Constitution Marsh. The site began as a battery-manufacturing plant in 1952, producing military and commercial batteries for a period of 27 years. Approximately 50,000 kg of cadmium were discharged into the EFCM as a result of MBC's wastewater-treatment system. In 1965 the New York State Department of Health ordered the plant to disconnect its industrial discharge from the Village's sanitary sewer upon concluding that the battery plant's process effluent could not be managed by a new proposed sewage-treatment system. The primary contaminants of concern include: cadmium, cobalt, and nickel. The remedial action for the EFCM component of the site includes hydraulic dredging of sediments; sediment chemical fixation; dredging, water treatment and disposal, marsh restoration, and long-term monitoring. The estimated capital cost for both remedial components is $16,640,000 with OandM costs of $3,530,000 for the first year; $180,000 for years 2-5; and $127,000 for years 6-30.

  6. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009

    SciTech Connect (OSTI)

    None

    2010-10-01T23:59:59.000Z

    This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

  7. Summary of the Hanford Site Environmental Report for Calendar Year 2007

    SciTech Connect (OSTI)

    Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

    2008-09-10T23:59:59.000Z

    This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2007." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights signifi cant environmental and public protection programs and efforts. Some historical and early 2008 information is included where appropriate.

  8. Summary of the Hanford Site Environmental Report for Calendar Year 2008

    SciTech Connect (OSTI)

    Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

    2009-09-15T23:59:59.000Z

    This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2008." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2009 information is included where appropriate.

  9. Summary of the Hanford Site Environmental Report for Calendar Year 2009

    SciTech Connect (OSTI)

    Duncan, Joanne P.; Poston, Ted M.; Dirkes, Roger L.

    2010-09-30T23:59:59.000Z

    This summary booklet summarizes the "Hanford Site Environmental Report for Calendar Year 2009." The Hanford Site environmental report, published annually since 1958, includes information and summary data that provide an overview of activities at the U.S. Department of Energy's (DOE) Hanford Site. The Hanford Site environmental report provides an overview of activities at the site; demonstrates the status of the site’s compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies and directives; and summarizes environmental data that characterize Hanford Site environmental management performance. The report also highlights significant environmental and public protection programs and efforts. Some historical and early 2010 information is included where appropriate.

  10. Final evaluation report for Westinghouse Hanford Company, WRAP-1,208 liter waste drum, docket 94-35-7A, type A packaging

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-06-12T23:59:59.000Z

    This report documents the U.S. Department of Transportation Specification 7A Type A (DOT-7A) compliance test results of the Westinghouse Hanford Company, Waste Receiving and Processing Facility, Module 1 (WRAP-1) Drum. The WRAP-1 Drum was tested for DOE-HQ in August 1994, by Los Alamos National Laboratory, under docket number 94-35-7A. Additionally, comparison and evaluation of the approved, as-tested packaging configuration was performed by WHC in September 1995. The WRAP-1 Drum was evaluated against the performance of the DOT-17C, 208 1 (55-gal) steel drums tested and evaluated under dockets 89-13-7A/90-18-7A and 94-37-7A.

  11. Calendar Year 2009 Groundwater Monitoring Report, U.S. Department of Energy, Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC

    2010-12-01T23:59:59.000Z

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2009 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2009 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2009 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2009 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for the wells in each regime that were sampled during CY 2009 by either the Y-1

  12. Calendar Year 2011 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC,

    2012-12-01T23:59:59.000Z

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2011 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. This report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and known extent of groundwater contamination. The CY 2011 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by the DOE Environmental Management (EM) contractor responsible for environmental cleanup on the ORR. In August 2011, URS | CH2M Oak Ridge LLC (UCOR) replaced Bechtel Jacobs Company LLC (BJC) as the DOE EM contractor. For this report, BJC/UCOR will be referenced as the managing contractor for CY 2011. Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC/UCOR (i.e., coordinating sample collection and sharing data) ensures that the CY 2011 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. This report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC/UCOR. Such details are deferred to the respective programmatic plans and reports issued by BJC. Collectively, the groundwater and surface water monitoring data obtained during CY 2011 by the Y-12 GWPP and BJC/UCOR address DOE Order 436.1 and DOE Order 458.1 requirements for monitoring groundwater and surface water quality in areas (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring) and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). This report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. This report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

  13. Calendar Year 2006 Groundwater Monitoring Report, U.S Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    N /A

    2007-09-01T23:59:59.000Z

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2006 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2006 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2006 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT), and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., preparing SAPs, coordinating sample collection, and sharing data) ensures that the CY 2006 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2006 by the Y-12 GWPP and BJC address DOE Order 450.1 (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater and surface water contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for the wells in each regime that were sampled during CY 2006 by either the Y-12 GWPP or BJC. F

  14. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  15. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2004

    SciTech Connect (OSTI)

    M. Stockton

    2005-10-01T23:59:59.000Z

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), ''Notice of Intent and Emissions Inventory Requirements''. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. This Title V Operating Permit (Permit No. P-100) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2004. LANL's 2004 emissions are well below the emission limits in the Title V Operating Permit.

  16. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2009

    SciTech Connect (OSTI)

    Environmental Stewardship Group

    2010-10-01T23:59:59.000Z

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2009. LANL's 2009 emissions are well below the emission limits in the Title V Operating Permit.

  17. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2006

    SciTech Connect (OSTI)

    Ecology and Air Quality Group

    2007-09-28T23:59:59.000Z

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. Modification Number 1 to this Title V Operating Permit was issued on June 15, 2006 (Permit No P-100M1) and includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2006. LANL's 2006 emissions are well below the emission limits in the Title V Operating Permit.

  18. Emissions inventory report summary for Los Alamos National Laboratory for calendar year 2008

    SciTech Connect (OSTI)

    Ecology and Air Quality Group

    2009-10-01T23:59:59.000Z

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory’s potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2008. LANL’s 2008 emissions are well below the emission limits in the Title V Operating Permit.

  19. Groundwater Level Status Report for Fiscal Year 2007 - Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Shannon P. Allen, Richard J. Koch

    2008-03-17T23:59:59.000Z

    The status of groundwater level monitoring at Los Alamos National Laboratory in Fiscal Year 2007 is provided in this report. The Groundwater Level Monitoring Project was instituted in 2005 to provide a framework for the collection and processing of quality controlled groundwater level data. This report summarizes groundwater level data for 166 monitoring wells, including 45 regional aquifer wells, 25 intermediate wells, and 96 alluvial wells, and 11 water supply wells. Pressure transducers were installed in 133 monitoring wells for continuous monitoring of groundwater levels. Time-series hydrographs of groundwater level data are presented along with pertinent construction and location information for each well.

  20. The Solar Thermal Design Assistance Center report of its activities and accomplishments in Fiscal Year 1993

    SciTech Connect (OSTI)

    Menicucci, D.F.

    1994-03-01T23:59:59.000Z

    The Solar Thermal Design Assistance Center (STDAC) at Sandia National Laboratories is a resource provided by the US Department of Energy`s Solar Thermal Program. Its major objectives are to accelerate the use of solar thermal systems through (a) direct technical assistance to users, (b) cooperative test, evaluation, and development efforts with private industry, and (c) educational outreach activities. This report outlines the major activities and accomplishments of the STDAC in Fiscal Year 1993. The report also contains a comprehensive list of persons who contacted the STDAC by telephone for information or technical consulting.

  1. Northeast Regional Biomass Program. Ninth year, Fourth quarterly report, July--September 1992

    SciTech Connect (OSTI)

    Lusk, P.D.

    1992-12-01T23:59:59.000Z

    The Northeast Regional Biomass Program has been in operation for a period of nine years. During this time, state managed programs and technical programs have been conducted covering a wide range of activities primarily aim at the use and applications of wood as a fuel. These activities include: assessments of available biomass resources; surveys to determine what industries, businesses, institutions, and utility companies use wood and wood waste for fuel; and workshops, seminars, and demonstrations to provide technical assistance. In the Northeast, an estimated 6.2 million tons of wood are used in the commercial and industrial sector, where 12.5 million cords are used for residential heating annually. Of this useage, 1504.7 mw of power has been generated from biomass. The use of wood energy products has had substantial employment and income benefits in the region. Although wood and woodwaste have received primary emphasis in the regional program, the use of municipal solid waste has received increased emphasis as an energy source. The energy contribution of biomass will increase as potentia users become more familiar with existing feedstocks, technologies, and applications. The Northeast Regional Biomass Program is designed to support region-specific to overcome near-term barriers to biomass energy use.

  2. Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992

    SciTech Connect (OSTI)

    Zaeh, R.A.

    1993-04-01T23:59:59.000Z

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    SciTech Connect (OSTI)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24T23:59:59.000Z

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  4. Calendar Year 2010 Groundwater Monitoring Report, U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Elvado Environmental LLC

    2011-12-01T23:59:59.000Z

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2010 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2010 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2010 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2010 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

  5. THE GENERAL ATOMICS FUSION THEORY PROGRAM ANNUAL REPORT FOR FISCAL YEAR 2002

    SciTech Connect (OSTI)

    PROJECT STAFF

    2002-12-01T23:59:59.000Z

    OAK B202 THE GENERAL ATOMICS FUSION THEORY PROGRAM ANNUAL REPORT FOR FISCAL YEAR 2002. The dual objective of the fusion theory program at General Atomics (GA) is to significantly advance the scientific understanding of the physics of fusion plasmas and to support the DIII-D and other tokamak experiments. The program plan is aimed at contributing significantly to the Fusion Energy Science and the Tokamak Concept Improvement goals of the Office of Fusion Energy Sciences (OFES).

  6. Weldon spring site environmental report for calendar year 1996. Revision 0

    SciTech Connect (OSTI)

    NONE

    1997-07-23T23:59:59.000Z

    This Site Environmental Report for Calendar Year 1996 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels and regulations, and to summarize trends and/or changes in contaminant concentrations identified through environmental monitoring.

  7. Fiscal Year 2014 Annual Report on BNLs Next Generation Safeguards Initiative Human Capital Development Activities

    SciTech Connect (OSTI)

    Pepper S. E.

    2014-10-10T23:59:59.000Z

    Brookhaven National Laboratory’s (BNL’s) Nonproliferation and National Security Department contributes to the National Nuclear Security Administration Office of Nonproliferation and International Security Next Generation Safeguards Initiative (NGSI) through university engagement, safeguards internships, safeguards courses, professional development, recruitment, and other activities aimed at ensuring the next generation of international safeguards professionals is adequately prepared to support the U.S. safeguards mission. This report is a summary of BNL s work under the NGSI program in Fiscal Year 2014.

  8. 300 Area D4 Project Fiscal Year 2008 Building Completion Report

    SciTech Connect (OSTI)

    R. A. Westberg

    2009-01-15T23:59:59.000Z

    This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of eighteen buildings in the 300 Area of the Hanford Site that were demolished in Fiscal Year 2008. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.

  9. Waste Isolation Pilot Plant Site Environmental Report for calendar year 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01T23:59:59.000Z

    This is the 1989 Site Environmental Report (SER) for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP is a government owned and contractor-operated facility. The WIPP project is operated by Westinghouse Electric Corporation for the US Department of Energy (DOE). The mission of the WIPP is to provide a research and development facility to demonstrate the safe disposal of transuranic (TRU) waste generated by the defense activities of the US Government. This report provides a comprehensive description of environmental activities at the WIPP during calendar year 1989. The WIPP facility will not receive waste until all concerns affecting opening the WIPP are addressed to the satisfaction of the Secretary of Energy. Therefore, this report describes the status of the preoperational activities of the Radiological Environmental Surveillance (RES) program, which are outlined in the Radiological Baseline Program for the Waste Isolation Pilot Plant (WTSD-TME-057). 72 refs., 13 figs., 20 tabs.

  10. Post-Closure Inspection and Monitoring Report for the Salmon, Mississippi, Site Calendar Year 2007

    SciTech Connect (OSTI)

    None

    2008-05-01T23:59:59.000Z

    This report summarizes inspection and monitoring activities performed on and near the Salmon, Mississippi, Site in calendar year 2007. The Draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report is submitted to comply with that requirement. The Tatum Salt Dome was used by the U.S. Atomic Energy Commission (AEC) for underground nuclear testing during the cold war. The land surface above the salt dome, the Salmon Site, is located in Lamar County, Mississippi, approximately 12 miles west of Purvis (Figure 1). The U.S. Department of Energy (DOE), the successor to the AEC, is responsible for long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned this responsibility effective October 2006.

  11. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    SciTech Connect (OSTI)

    NONE

    1997-12-31T23:59:59.000Z

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

  12. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    SciTech Connect (OSTI)

    CD Carlson; SQ Bennett

    2000-07-25T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup.

  13. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report

    SciTech Connect (OSTI)

    Carlson, Clark D.; Bennett, Sheila Q.

    2000-07-25T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998 and seven in fiscal year 1999.(a) All of the fiscal year 1996 awards have been completed and the Principal Investigators are writing final reports, so their summaries will not be included in this document. This section summarizes how each of the currently funded grants addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, and Soil and Groundwater Cleanup.

  14. harvard university financial report

    E-Print Network [OSTI]

    portfolio earned an invest- ment return of 11.0% and had a year-end value of $27.6 billion. In the wake the president 3 financial overview 8 message from the ceo of harvard management company 14 report of independent;3 harvarduniversityfinancialoverview In its fiscal year ended June 30, 2010, the University made significant progress in managing

  15. Human factors engineering control-room-design review/audit report: Palo Verde Nuclear Generating Station, Arizona Public Service Company

    SciTech Connect (OSTI)

    Savage, J.W.; Lappa, D.A.

    1981-10-09T23:59:59.000Z

    A human factors engineering design review of the Palo Verde control room simulator was performed at the site on September 15 through September 17, 1981. Observed human factors design discrepancies were given priority ratings. This report summarizes the team's observations of the control room design and layout and of the control room operators' interface with the control room environment. A list of the human factors strengths observed in the Palo Verde control room simulator is given.

  16. Looking past the first year: Do the savings last?. A study of the persistence of energy savings in low-income Wisconsin residences, final report

    SciTech Connect (OSTI)

    Narum, D.; Pigg, S.; Schlegel, J.

    1992-09-01T23:59:59.000Z

    Wisconsin Energy Conservation Corporation (WECC) conducted a Study of the Persistence of Energy Savings in Low-Income Wisconsin Residences for the Department of Energy`s (DOE) Existing Buildings Efficiency Program. The study assessed the persistence of energy savings resulting from participation in the Wisconsin Utility Weatherization Assistance Program (UWAP). The study assessed the impact of weatherization and heating system measures up to eight years after the installation of energy conservation measures (ECMS) in low-income, gas-heated residences, the majority of which are 1- and 2-unit buildings. Primary data for the study came from two utilities, Wisconsin Gas Company and Madison Gas & Electric Company. Both utilities provided WECC with their weatherization program databases, which contained participant information back to 1982. WECC also obtained fuel consumption information for the program participants from each utility. The consumption histories spanned a 6-year period from March 1985 through May 1991 for Wisconsin Gas Company participants, and a 5-year period from October 1986 through August 1991 for Madison Gas & Electric Company participants. After attrition, the study included 5,129 customers from the Wisconsin Gas Company program and 1,553 customers from the Madison Gas & Electric Company program.

  17. Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

  18. Environmental Education and Development Division (EM-522). Annual report, Fiscal year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31T23:59:59.000Z

    The Environmental Education and Development Division (EM-522) is one of three divisions within the Office of Technology Integration and Environmental Education and Development (EM-52) in Environmental Restoration and Waste Management`s (EM`s) Office of Technology Development (EM-50). The primary design criterion for EM-522 education activities is directly related to meeting EM`s goal of environmental compliance on an accelerated basis and cleanup of the 1989 inventory of inactive sites and facilities by the year 2019. Therefore, EM-522`s efforts are directed specifically toward stimulating knowledge and capabilities to achieve the goals of EM while contributing to DOE`s overall goal of increasing scientific, mathematical, and technical literacy and competency. This report discusses fiscal year 1993 activities.

  19. Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1981

    SciTech Connect (OSTI)

    Black, S.C.; Grossman, R.F.; Mullen, A.A.; Potter, G.D.; Smith, D.D.; Hopper, J.L. (comps.)

    1982-08-01T23:59:59.000Z

    This report, prepared in accordance with the guidelines in DOE/E-0023 (DOE 1981), covers the program activities conducted around Nevada Test Site (NTS) for calendar year 1981. It contains descriptions of pertinent features of the NTS and its environs, summaries of the dosimetry and sampling methods, analytical procedures, and the analytical results from environmental measurements. Where applicable, dosimetry and sampling data are compared to appropriate guides for external and internal exposures of humans to ionizing radiation. The monitoring networks detected no radioactivity in the various media which could be attributed to US nuclear testing. Small amounts of fission products were detected in air samples as a result of the People's Republic of China nuclear test and atmospheric krypton-85 increased, following the trend beginning in 1960, due to increased use of nuclear technology. Strontium-90 in milk and cesium-137 in meat samples continued the slow decline as observed for the last several years.

  20. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    None

    2011-03-01T23:59:59.000Z

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  1. Advanced Test Reactor Critical Facility safety analysis report five year currency review

    SciTech Connect (OSTI)

    Napper, P.R.; Carpenter, W.R.; Garner, R.W.

    1991-05-01T23:59:59.000Z

    By DOE-ID Order 5481.1A, a five year currency review is required of the Safety Analysis Reports of all ID or ID contractor operations having hazards of a type and magnitude not routinely encountered and/or accepted by the public. In keeping with this order, a currency review has been performed of the Advanced Test Reactor Critical Facility (ADTRC) Safety Analysis Report (SAR), Issue 003, 1990. The objectives of this currency review were to: evaluate the content, completeness, clarity of presentation and compliance with NRC Regulatory Guides and DOE Orders, etc., and evaluate the technical content of the SAR, particularly the Technical Specifications, and to evaluate the safety of continued operation of the ATRC. The reviewers concluded that although improvements may be needed in the overall content, clarity, and demonstration of compliance with current orders and regulations, the safety of the ATRC is in no way compromised and no unreviewed safety questions were identified. 6 figs., 3 tabs.

  2. Hanford Double-Shell Tank Inspection Annual Report Calendar Year 2012

    SciTech Connect (OSTI)

    Petermann, Tasha M.; Boomer, Kayle D.; Washenfelder, D. J.

    2013-12-02T23:59:59.000Z

    The double-shell tanks (DSTs) were constructed between 1968 and 1986. They will have exceeded their design life before the waste can be removed and trasferred to the Waste Treatment and Immobilization Plant for vitrification. The Double-Shell Tank Integrity Project has been established to evaluate tank aging, and ensure that each tank is structurally sound for continued use. This is the first issue of the Double-Shell Tank Inspection Annual Report. The purpose of this issue is to summarize the results of DST inspections conducted from the beginnng of the inspection program through the end of CY2012. Hereafter, the report will be updated annually with summaries of the past year's DST inspection activities.

  3. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    SciTech Connect (OSTI)

    NONE

    1996-10-01T23:59:59.000Z

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

  4. Final Report of a CRADA Between Pacific Northwest National Laboratory and the General Motors Company (CRADA No. PNNL/271): “Degradation Mechanisms of Urea Selective Catalytic Reduction Technology”

    SciTech Connect (OSTI)

    Kim, Do Heui; Lee, Jong H.; Peden, Charles HF; Howden, Ken; Kim, Chang H.; Oh, Se H.; Schmieg, Steven J.; Wiebenga, Michelle H.

    2011-12-13T23:59:59.000Z

    Diesel engines can offer substantially higher fuel efficiency, good driving performance characteristics, and reduced carbon dioxide (CO2) emission compared to stoichiometric gasoline engines. Despite the increasing public demand for higher fuel economy and reduced dependency on imported oil, however, meeting the stringent emission standards with affordable methods has been a major challenge for the wide application of these fuel-efficient engines in the US market. The selective catalytic reduction of NOx by urea (urea-SCR) is one of the most promising technologies for NOx emission control for diesel engine exhausts. To ensure successful NOx emission control in the urea-SCR technology, both a diesel oxidation catalyst (DOC) and a urea-SCR catalyst with high activity and durability are critical for the emission control system. Because the use of this technology for light-duty diesel vehicle applications is new, the relative lack of experience makes it especially challenging to satisfy the durability requirements. Of particular concern is being able to realistically simulate actual field aging of the catalyst systems under laboratory conditions, which is necessary both as a rapid assessment tool for verifying improved performance and certifiability of new catalyst formulations. In addition, it is imperative to develop a good understanding of deactivation mechanisms to help develop improved catalyst materials. In this CRADA program, General Motors Company and PNNL have investigated fresh, laboratory- and vehicle-aged DOC and SCR catalysts. The studies have led to a better understanding of various aging factors that impact the long-term performance of catalysts used in the urea-SCR technology, and have improved the correlation between laboratory and vehicle aging for reduced development time and cost. This Final Report briefly highlights many of the technical accomplishments and documents the productivity of the program in terms of peer-reviewed scientific publications (2 total), reports (3 total including this Final Report), and presentations (5 total).

  5. Divison of Environmental Education and Development Fiscal Year 1992 annual report

    SciTech Connect (OSTI)

    Not Available

    1992-12-31T23:59:59.000Z

    Primary design criterion for this division`s education activities is directly related to meeting the goal of environmental compliance on an accelerated basis and cleanup of the 1989 inventory of inactive sites and facilities by the year 2019. Therefore, the division`s efforts are directed toward stimulating knowledge and capability to achieve the goals while contributing to DOE`s overall goal of increasing scientific, mathematical, and technical literacy and competency. This annual report is divided into: overview, workforce development, academic partnerships, scholarships/fellowships, environmental restoration and waste management employment program, community colleges, outreach, evaluation, and principal DOE contacts.

  6. Site environmental report for calendar year 1996: Yucca Mountain site, Nye County, Nevada

    SciTech Connect (OSTI)

    NONE

    1997-11-01T23:59:59.000Z

    The environmental program established by the Yucca Mountain Site Characterization Office (YMSCO) has been designed and implemented to protect, maintain, and restore environmental quality, minimize potential threats to the environment and the public, and comply with environmental policies and US Department of Energy (DOE) Orders. In accordance with DOE Order 5400.1, General Environmental Protection Program (DOE, 1990a), to be superseded by DOE Order 231.1 (under review), the status of the Yucca Mountain Site Characterization Project (YMP) environmental program has been summarized in this annual Site Environmental Report (SER) to characterize performance, document compliance with environmental requirements, and highlight significant programs and efforts during calendar year 1996.

  7. Calendar Year 2004 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    N /A

    2005-09-01T23:59:59.000Z

    This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2004 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2004 monitoring data were obtained from groundwater and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge south of Y-12. The CY 2004 monitoring data were obtained under the Y-12 Groundwater Protection Program (GWPP) managed by BWXT Y-12, L.L.C. (BWXT) and several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Data contained in this report meet applicable requirements of DOE Order 450.1 (Environmental Protection Program) regarding evaluation of groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). However, detailed analysis, evaluation, and interpretation of the CY 2004 monitoring data is deferred to the Y-12 Groundwater Protection Program Groundwater Monitoring Data Compendium (BWXT 2005). For each monitoring well, spring, and surface water sampling station included in this report, the GWPP Compendium provides: (1) pertinent well installation and construction information; (2) a complete sampling history, including sampling methods and distinguishing sampling characteristics; (3) an evaluation of hydrologic characteristics, based on pre-sampling groundwater elevations, along with a compilation of available test results (e.g., hydraulic conductivity test data); (4) a discussion of geochemical characteristics based on evaluation of the analytical results for the primary anions and cations; and (5) a detailed analysis and interpretation of the available data for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. The following sections of this report provide details regarding the CY 2004 groundwater and surface water monitoring activities in the Bear Creek, East Fork, and Chestnut Ridge Regime. Section 2 briefly describes the hydrogeologic system and generalized extent of groundwater contamination in each regime. Section 3 describes the monitoring programs implemented and associated sampling activities performed in each regime during CY 2004. Section 4 presents an a summary of the CY 2004 monitoring data with regard to the provisions of DOE Order 450.1 (surveillance and exit pathway/perimeter monitoring), including highlights of notable findings and time-series plots of data for CY 2004 sampling locations that provide representative examples of long-term contaminant concentration trends. Brief conclusions and proposed recommendations are provided in Section 5. Section 6 lists the documents cited for more detailed operational, regulatory, and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Monitoring well construction details are in Appendix C. Results of field measurements and laboratory analyses of the groundwater and surface water samples collected during CY 2004 are in Appendix D (Bear Creek Regime), Appendix E (East Fork Regime and surrounding areas), and Appendix F (Chestnut Ridge Regime). Appendix G contai

  8. Pacific Northwest and Alaska Regional Bioenergy Program : Five Year Report, 1985-1990.

    SciTech Connect (OSTI)

    Pacific Northwest and Alaska Bioenergy Program (U.S.)

    1991-02-01T23:59:59.000Z

    This five-year report describes activities of the Pacific Northwest and Alaska Regional Bioenergy Program between 1985 and 1990. Begun in 1979, this Regional Bioenergy Program became the model for the nation's four other regional bioenergy programs in 1983. Within the time span of this report, the Pacific Northwest and Alaska Regional Bioenergy Program has undertaken a number of applied research and technology projects, and supported and guided the work of its five participating state energy programs. During this period, the Regional Bioenergy Program has brought together public- and private-sector organizations to promote the use of local biomass and municipal-waste energy resources and technologies. This report claims information on the mission, goals and accomplishments of the Regional Bioenergy Program. It describes the biomass projects conducted by the individual states of the region, and summarizes the results of the programs technical studies. Publications from both the state and regional projects are listed. The report goes on to consider future efforts of the Regional Bioenergy Program under its challenging assignment. Research activities include: forest residue estimates; Landsat biomass mapping; woody biomass plantations; industrial wood-fuel market; residential space heating with wood; materials recovery of residues; co-firing wood chips with coal; biomass fuel characterization; wood-boosted geothermal power plants; wood gasification; municipal solid wastes to energy; woodstove study; slash burning; forest depletion; and technology transfer. 9 figs., 6 tabs.

  9. North Wind Power Company 2-kilowatt high-reliability wind system. Phase I. Design and analysis. Technical report

    SciTech Connect (OSTI)

    Mayer, D J; Norton, Jr, J H

    1981-07-01T23:59:59.000Z

    Results are presented of Phase I of a program to design a 2kW high reliability wind turbine for use in remote locations and harsh environments. In phase I of the program, a predecessor of the proposed design was procured and tested in a wind tunnel and in the freestream to observe operational characteristics. An analytical procedure was developed for designing and modelling the proposed variable axis rotor control system (VARCS). This was then verified by extensive mobile testing of pre-prototype components. A low speed three phase alternator with a Lundel type rotor was designed. Prototypes were fabricated and tested to refine calculation procedures and develop an effective alternator with appropriate characteristics. A solid state field switching regulator was designed and tested successfully. All necessary support elements were designed and engineered. A complete analysis of system reliability was conducted including failure mode and effects analyses and reliability, maintenance and safety analyses. Cost estimates were performed for a mature product in production rates of 1000 per year. Analysis and testing conducted throughout the first phase is included.

  10. Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report

    SciTech Connect (OSTI)

    Peurrung, L.M.

    1999-06-30T23:59:59.000Z

    Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

  11. Competitor Analysis Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    chemical company providing the household and industrial detergent, personal care, lubricant, oilfield

  12. In summary: Idaho National Engineering Laboratory site environmental report for calendar year 1995

    SciTech Connect (OSTI)

    Roush, D.; Mitchell, R.G.; Peterson, D.

    1996-08-01T23:59:59.000Z

    Every human is exposed to natural radiation. This exposure comes from many sources, including cosmic radiation from outer space, naturally-occurring radon, and radioactivity from substances in our bodies. In addition to natural sources of radiation, humans can also be exposed to man-made sources of radiation. Examples of man-made sources include nuclear medicine, X-rays, nuclear weapons testing, and accidents at nuclear power plants. The Idaho National Engineering Laboratory (INEL) is a U.S. Department of Energy (DOE) research facility that deals, in part, with studying nuclear reactors and storing radioactive materials. Careful handling and rigorous procedures do not completely eliminate the risk of releasing radioactivity. So, there is a remote possibility for a member of the public near the INEL to be exposed to radioactivity from the INEL. Extensive monitoring of the environment takes place on and around the INEL. These programs search for radionuclides and other contaminants. The results of these programs are presented each year in a site environmental report. This document summarizes the Idaho National Engineering Laboratory Site Environmental Report for Calendar Year 1995.

  13. Hot dry rock energy: Hot dry rock geothermal development program. Progress report. Fiscal year 1993

    SciTech Connect (OSTI)

    Salazar, J.; Brown, M. [eds.

    1995-03-01T23:59:59.000Z

    Extended flow testing at the Fenton Hill Hot Dry Rock (HDR) test facility concluded in Fiscal Year 1993 with the completion of Phase 2 of the long-term flow test (LTFT) program. As is reported in detail in this report, the second phase of the LTFT, although only 55 days in duration, confirmed in every way the encouraging test results of the 112-day Phase I LTFT carried out in Fiscal Year 1992. Interim flow testing was conducted early in FY 1993 during the period between the two LTFT segments. In addition, two brief tests involving operation of the reservoir on a cyclic schedule were run at the end of the Phase 2 LTFT. These interim and cyclic tests provided an opportunity to conduct evaluations and field demonstrations of several reservoir engineering concepts that can now be applied to significantly increase the productivity of HDR systems. The Fenton Hill HDR test facility was shut down and brought into standby status during the last part of FY 1993. Unfortunately, the world`s largest, deepest, and most productive HDR reservoir has gone essentially unused since that time.

  14. Site environmental report for calendar year 1997, Yucca Mountain Site, Nye County, Nevada

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    This document is the seventh annual Site Environmental Report (SER) submitted by the Yucca Mountain Site Characterization Office (YMSCO) to describe the environmental program implemented by the US Department of Energy (DOE) at Yucca Mountain. As prescribed by the Nuclear Waste Policy Act (NWPA, 1982), this program ensures that site characterization activities are conducted in a manner that minimizes any significant adverse impacts to the environment and complies with all applicable laws and regulations. The most recent guidelines for the preparation of the SER place major emphasis on liquid and gaseous emissions of radionuclides, pollutants or hazardous substances; human exposure to radionuclides; and trends observed by comparing data collected over a period of years. To date, the YMP has not been the source of any radioactive emissions or been responsible for any human exposure to radionuclides. Minuscule amounts of radioactivity detected at the site are derived from natural sources or from dust previously contaminated by nuclear tests conducted in the past at the NTS. Because data for only a few years exist for the site, identification of long-term trends is not yet possible. Despite the lack of the aforementioned categories of information requested for the SER, the YMP has collected considerable material relevant to this report. An extensive environmental monitoring and mitigation program is currently in place and is described herein. Also, as requested by the SER guidelines, an account of YMP compliance with appropriate environmental legislation is provided.

  15. Arrow Lakes Reservoir Fertilization Experiment; Years 4 and 5, Technical Report 2002-2003.

    SciTech Connect (OSTI)

    Schindler, E.

    2007-02-01T23:59:59.000Z

    This report presents the fourth and fifth year (2002 and 2003, respectively) of a five-year fertilization experiment on the Arrow Lakes Reservoir. The goal of the experiment was to increase kokanee populations impacted from hydroelectric development on the Arrow Lakes Reservoir. The impacts resulted in declining stocks of kokanee, a native land-locked sockeye salmon (Oncorhynchus nerka), a key species of the ecosystem. Arrow Lakes Reservoir, located in southeastern British Columbia, has undergone experimental fertilization since 1999. It is modeled after the successful Kootenay Lake fertilization experiment. The amount of fertilizer added in 2002 and 2003 was similar to the previous three years. Phosphorus loading from fertilizer was 52.8 metric tons and nitrogen loading from fertilizer was 268 metric tons. As in previous years, fertilizer additions occurred between the end of April and the beginning of September. Surface temperatures were generally warmer in 2003 than in 2002 in the Arrow Lakes Reservoir from May to September. Local tributary flows to Arrow Lakes Reservoir in 2002 and 2003 were generally less than average, however not as low as had occurred in 2001. Water chemistry parameters in select rivers and streams were similar to previous years results, except for dissolved inorganic nitrogen (DIN) concentrations which were significantly less in 2001, 2002 and 2003. The reduced snow pack in 2001 and 2003 would explain the lower concentrations of DIN. The natural load of DIN to the Arrow system ranged from 7200 tonnes in 1997 to 4500 tonnes in 2003; these results coincide with the decrease in DIN measurements from water samples taken in the reservoir during this period. Water chemistry parameters in the reservoir were similar to previous years of study except for a few exceptions. Seasonal averages of total phosphorus ranged from 2.11 to 7.42 {micro}g/L from 1997 through 2003 in the entire reservoir which were indicative of oligo-mesotrophic conditions. Dissolved inorganic nitrogen concentrations have decreased in 2002 and 2003 compared to previous years. These results indicate that the surface waters in Arrow Lakes Reservoir were approaching nitrogen limitation. Results from the 2003 discrete profile series indicate nitrate concentrations decreased significantly below 25 {micro}g/L (which is the concentration where nitrate is considered limiting to phytoplankton) between June and July at stations in Upper Arrow and Lower Arrow. Nitrogen to phosphorus ratios (weight:weight) were also low during these months indicating that the surface waters were nitrogen deficient. These results indicated that the nitrogen to phosphorus blends of fertilizer added to the reservoir need to be fine tuned and closely monitored on a weekly basis in future years of nutrient addition. Phytoplankton results shifted during 2002 and 2003 compared to previous years. During 2002, there was a co-dominance of potentially 'inedible' diatoms (Fragilaria spp. and Diatoma) and 'greens' (Ulothrix). Large diatom populations occurred in 2003 and these results indicate it may be necessary to alter the frequency and amounts of weekly loads of nitrogen and phosphorus in future years to prevent the growth of inedible diatoms. Zooplankton density in 2002 and 2003, as in previous years, indicated higher densities in Lower Arrow than in Upper Arrow. Copepods and other Cladocera (mainly tiny specimens such as Bosmina sp.) had distinct peaks, higher than in previous years, while Daphnia was not present in higher numbers particularly in Upper Arrow. This density shift in favor to smaller cladocerans was mirrored in a weak biomass increase. In Upper Arrow, total zooplankton biomass decreased from 1999 to 2002, and in 2003 increased slightly, while in Lower Arrow the biomass decreased from 2000-2002. In Lower Arrow the majority of biomass was comprised of Daphnia throughout the study period except in 2002, while in Upper Arrow the total biomass was comprised of copepods from 2000-2003.

  16. Waste Treatment Plant Support Program: Summaries of Reports Produced During Fiscal Years 1999-2010

    SciTech Connect (OSTI)

    Beeman, Gordon H.

    2010-08-12T23:59:59.000Z

    The Waste Treatment Plant (WTP) being built on the U.S. Department of Energy (DOE) Hanford Site will be the largest chemical processing plant in the United States. Bechtel National Inc. (BNI) is the designer and constructor for the WTP. The Pacific Northwest National Laboratory (PNNL) has provided significant research and testing support to the WTP. This report provides a summary of reports developed initially under PNNL’s “1831” use agreement and later PNNL’s “1830” prime contract with DOE in support of the WTP. In March 2001, PNNL under its “1831” use agreement entered into a contract with BNI to support their research and testing activities. However, PNNL support to the WTP predates BNI involvement. Prior to March 2001, PNNL supported British Nuclear Fuels Ltd. in its role as overall designer and constructor. In February 2007, execution of PNNL’s support to the WTP was moved under its “1830” prime contract with DOE. Documents numbered “PNWD-XXXX” were issued under PNNL’s “1831” use agreement. Documents numbered “PNNL-XXXX” were issued under PNNL’s “1830” prime contract with DOE. The documents are sorted by fiscal year and categorized as follows: ? Characterization ? HLW (High Level Waste) ? Material Characterization ? Pretreatment ? Simulant Development ? Vitrification ? Waste Form Qualification. This report is intended to provide a compendium of reports issued by PNWD/PNNL in support of the Waste Treatment Plant. Copies of all reports can be obtained by clicking on http://www.pnl.gov/rpp-wtp/ and downloading the .pdf file(s) to your computer.

  17. Spent fuel test - Climax: technical measurements. Interim report, fiscal year 1981

    SciTech Connect (OSTI)

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.

    1982-04-30T23:59:59.000Z

    The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the Nevada Test Site. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized from April to May 1980, initiating the 3- to 5-year-duration test. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Technical objectives of the test led to development of a technical measurements program, which is the subject of this report. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 1-1/2 years of the test on more than 900 channels. Much of the acquired data are now available for analysis and are presented here. Highlights of activities this year include completion of site characterization field work, major modifications to the data acquisition and the management systems, and the addition of instrument evaluation as an explicit objective of the test.

  18. Argonne National Laboratory summary site environmental report for calendar year 2007.

    SciTech Connect (OSTI)

    Golchert, N. W.

    2009-05-22T23:59:59.000Z

    This summary of Argonne National Laboratory's Site Environmental Report for calendar year 2007 was written by 20 students at Downers Grove South High School in Downers Grove, Ill. The student authors are classmates in Mr. Howard's Bio II course. Biology II is a research-based class that teaches students the process of research by showing them how the sciences apply to daily life. For the past seven years, Argonne has worked with Biology II students to create a short document summarizing the Site Environmental Report to provide the public with an easy-to-read summary of the annual 300-page technical report on the results of Argonne's on-site environmental monitoring program. The summary is made available online and given to visitors to Argonne, researchers interested in collaborating with Argonne, future employees, and many others. In addition to providing Argonne and the public with an easily understandable short summary of a large technical document, the participating students learn about professional environmental monitoring procedures, achieve a better understanding of the time and effort put forth into summarizing and publishing research, and gain confidence in their own abilities to express themselves in writing. The Argonne Summary Site Environmental Report fits into the educational needs for 12th grade students. Illinois State Educational Goal 12 states that a student should understand the fundamental concepts, principles, and interconnections of the life, physical, and earth/space sciences. To create this summary booklet, the students had to read and understand the larger technical report, which discusses in-depth many activities and programs that have been established by Argonne to maintain a safe local environment. Creating this Summary Site Environmental Report also helps students fulfill Illinois State Learning Standard 12B5a, which requires that students be able to analyze and explain biodiversity issues, and the causes and effects of extinction. The same standard requires that Illinois students examine the impact of diminishing biodiversity due to human activity. An example of this would be the Argonne Restoration Prairie, which is discussed within the report. Because humans had to destroy part of a natural prairie in order to build, they must also plant an equivalent amount of prairie to make up for what was destroyed. The summary project perfectly meets Illinois State Learning Standard 13B section 5b, which requires students to be able to design and conduct an environmental impact study, analyze findings, and justify recommendations. Students volunteered for the project for two main reasons: We would become published authors, and could include that fact on important documents, like college applications, and we felt we were doing a good deed for the public, considering that without our summary the public may have no real idea how Argonne complies with various environmental protection acts and programs within the state. The summarization process was not easy, considering that we had never seen much of this kind of information before, especially in such detail. The project required a high level of commitment from all involved. This commitment ensured that the summary would be done on time and would be available to the public in the shortest time possible. Argonne representatives Norbert Golchert and Dave Baurac met with students and gave background information on Argonne and explained the importance of the research being done. In addition, they explained in-depth how the public benefits from the summarization. At the end of the presentation, students asked some questions, which were answered in specifics. The Report was divided into 10 sections, with groups of two students covering each section. The groups were eager to begin work on their assigned sections. After reading the complete report each group focused on a particular section. After much careful reading and analysis, we produced an outline. From the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited,

  19. The Idaho National Engineering Laboratory Site environmental report for calendar Year 1990

    SciTech Connect (OSTI)

    Hoff, D.L.; Mitchell, R.G.; Moore, R.; Shaw, R.M.

    1991-06-01T23:59:59.000Z

    The results of the various monitoring programs for 1990 indicate that most radioactivity from the Idaho National Engineering Laboratory (INEL) operations could not be distinguished from worldwide fallout and natural radioactivity in the region surrounding the INEL Site. Although some radioactive materials were discharged during Site operations, concentrations and doses to the surrounding population were of no health consequence and were far less than State of Idaho and Federal health protection guidelines. The first section of the report summarizes Calendar Year 1990 and January 1 through April 1, 1991, INEL activities related to compliance with environmental regulations and laws. The balance of the report describes the surveillance program, the collection of foodstuffs at the INEL boundary and distant offsite locations, and the collection of air and water samples at onsite locations and offsite boundary and distant locations. The report also compares and evaluates the sample results and discusses implications, if any. Nonradioactive and radioactive effluent monitoring at the Site, and the US Geological Survey (USGS) ground-water monitoring program are also summarized. 33 refs., 18 figs., 29 tabs.

  20. Lockheed Martin Energy Systems, Inc., Groundwater Program Office. Annual report for fiscal year 1994

    SciTech Connect (OSTI)

    NONE

    1994-09-30T23:59:59.000Z

    This edition of the Lockheed Martin Energy Systems, Inc., (Energy Systems) Groundwater Program Annual Report summarizes the work carried out by the Energy Systems Groundwater Program Office (GWPO) for fiscal year (FY) 1994. The GWPO is responsible for coordination and oversight for all components of the groundwater programs at the three Oak Ridge facilities [Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants (PGDP and PORTS, respectively.) This report describes the administrative framework of the GWPO including staffing, organization, and funding sources. In addition, summaries are provided of activities involving the Technical Support staff at the five facilities. Finally, the results of basic investigations designed to improve our understanding of the major processes governing groundwater flow and contaminant migration on the Oak Ridge Reservation (ORR) are reported. These investigations are conducted as part of the Oak Ridge Reservation Hydrology and Geology Studies (ORRHAGS) program. The relevance of these studies to the overall remediation responsibilities of Energy Systems is discussed.