Powered by Deep Web Technologies
Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Project Assessment and Reporting System (PARS II) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Assessment and Reporting System (PARS II) Project Assessment and Reporting System (PARS II) Project Assessment and Reporting System (PARS II) Welcome to PARS II PARS II is the Department's official "System of Record" for capital asset project performance information. Because PARS II uses the same data as maintained in our contractors' project management systems, everyone from the Federal Project Director's staff to the Secretary of Energy will have easy access to the same data. The PARS II software application is managed by the MA Office of Engineering and Construction Management and is used by federal and contractor personnel across the nation to record and track the progress of major construction and environmental cleanup projects. Questions or comments about PARS II should be directed to the PARS II Help

2

Project Assessment & Reporting System (PARS II) Release Notes: Version 8.0.20120308  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Assessment & Project Assessment & Reporting System (PARS II) Release Notes: Version 8.0.20120308 Release Date: 05/19/2012 Achieving Management and Operational Excellence Page 2 PARS II - Enhancements New and improved functionality was released in Version 8.0.20120308 of PARS II. This release offers PARS II Users a significant number of enhancements across all facets of the application. These enhancements include additional refinements to the "look and feel" of the system. Enhancements are a result of community/User recommendations. System usability as well as providing improved means for data collection, validation and reporting were strategically designed and tested over the past several months. An explanation of each enhancement ,

3

Configuring Workstations for use with the PARS II System  

Energy.gov (U.S. Department of Energy (DOE))

This file provides the users with instructions on how to configure the workstations to work with the Department's Project Assessment Reporting System (PARS II)

4

PARS II Process Document OVERTARGET BASELINE (OTB) REPORTING IN PARS II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Document Process Document OVERTARGET BASELINE (OTB) REPORTING IN PARS II PURPOSE The purpose of this document is to describe the process by which contractors should conduct OTB reporting after OTB on the project was approved and implemented in the contractor system. SCOPE This process applies to projects on which OVERTARGET BASELINE (OTB) was approved and implemented and identifies data elements, information, and processes by which contractor should report changes related to OTB in PARS II. PROCESS Upon implementation of OTB, the following data elements must be provided by the contractor into PARS II. Contractor should validate accuracy of the data in each identified field by reviewing EV_CPR_HEADER table of the PARS II Upload Template file. * OTB/OTS Date: Date when OTB/OTS was implemented in contractor system. If this data element does

5

Configuring Client PCs for use with Project Assessment and Reporting System(PARS II)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4/2011 4/2011 Page 1 of 4 1 PROCEDURES 1.1 Introduction Most users will be comfortable with contacting their IT Helpdesk for completing the instructions below. However, if you have Admin rights on your workstation, and are comfortable with making configuration changes to it, you may follow these directions yourself. 1.2 Installation of ActiveX Control WINDOWS XP 1. Log onto the workstation to be configured using an ID/Password that can perform administrative functions on that workstation (e.g. Install software, add Active-X controls). Note that administrative access is only required for initial workstation configuration, not ongoing operation of the PARS II application. 2. Check hardware, software and network requirements as identified in section 2 below. Less than

6

PARS II Reports Catalog, V 0.02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Catalog, V 0.02 Catalog, V 0.02 Tuesday, May 3, 2011 U.S. Department of Energy Project Assessment and Reporting System Reports Catalog Version 0.02 This booklet describes each report in PARS II, including those created specifically for the DOE, and those that come standard with the Dekker PMIS(tm) software package. Each report description is followed by an image or images of the report. 2 Introduction This document contains detailed description and specifications of all reports currently available in PARS II Shared Reports. All reports are distributed in logical folders that relate to a report's general use and this document will help the user to identify specific report that would address individual need. While all reports listed in the document are available to all users, below are some general guidelines as to the usefulness

7

PARS II Process Document OVERTARGET BASELINE (OTB) REPORTING...  

Energy Savers (EERE)

Variance (CV), Schedule Variance (SV), and Budget (BAC & MR) as reported in CPR Format 1 12a, 12b, and 13 should be reported into PARS II in a form of a CPR Format 1 document...

8

ADVISORY ALERT: Dekker, Ltd. Digital Signature - PARS II Reporting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADVISORY ALERT: Dekker, Ltd. Digital Signature - PARS II Reporting ADVISORY ALERT: Dekker, Ltd. Digital Signature - PARS II Reporting As you know, to run reports in the PARS II, users must install an active X control to their workstations. The FIRST TIME a user attempts to run a report after installing the Active X control, a Security Warning will appear stating: That warning appears because, although the digital signature is valid, the digital signature is from a publisher (in this case Dekker, Ltd.) whom you have not yet chosen to trust. The following steps instruct you how to clear the security warning so that you may continue working with PARS II reports. Please note: Once you complete the process of accepting the Dekker, LTd. digital signature, this warning will not re-appear. This process must be done ONCE to "inform" your PC that Dekker, LTd. is an

9

par  

E-Print Network (OSTI)

pour obtenir le grade de Docteur čs sciences de l’Université Paris XI Orsay Potentiel de découverte par le détecteur ATLAS du boson de Higgs produit par fusion de bosons vecteurs et mise au point de la mesure de l’énergie transverse manquante calorimétrique soutenue devant la commission d’examen composée de:

Dimitris Varouchas; M. C. Anastasiou; M. K. Cranmer; Dimitris Varouchas

2010-01-01T23:59:59.000Z

10

PARS II TRAINING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 (V1.1) PARS II 102 Monthly Updating and Reporting i 10 (V1.1) PARS II 102 Monthly Updating and Reporting i Project Assessment and Reporting System PARS II 102 Monthly Updating and Reporting Training Workbook (PARS II Release 1.1) Department of Energy September 13, 2010 September 13,, 2010 (V1.1) PARS II 102 Monthly Updating and Reporting ii Table of Contents OVERSIGHT and ASSESSMENT ........................................................................................................ 1 Exercise 1: Find and View a Project ............................................................................................ 1 Sort the Project List ................................................................................................................. 3

11

PARS II Data Quality Memorandum from Deputy Secretary Poneman...  

Energy Savers (EERE)

II Data Quality Memorandum from Deputy Secretary Poneman (June 19, 2012) PARS II Data Quality.pdf More Documents & Publications Project Assessment and Reporting System (PARS...

12

DOE Publishes CALiPER Report on Lumen and Chromaticity Maintenance of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy's CALiPER program has released Report 20.4, which is part of a series of investigations on LED PAR38 lamps. Report 20.4 focuses on lumen maintenance, chromaticity...

13

DOE Publishes New CALiPER Report on Subjective Evaluation of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

DOE has published the first in a series of four special investigations intended to extend the findings of CALiPER Application Summary Report 20: LED PAR38 Lamps, which was published late last year.

14

PARS II Training Materials | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Materials Training Materials PARS II Training Materials PARS II presentation hand-outs and step-by-step "how to" exercises for each course are available for download. Users who are attending Web classes should download these documents prior to attending the class. Slides from the APM "Road Show" Earned Value (EV) Analysis and Project Assessment & Reporting System (PARS II) PARS 102 - Monthly Updating and Reporting Introduction to PARS II, finding and selecting projects in your domain, viewing Oversight and Assessment (OA) data, viewing Contractor Project Performance (CPP) dashboards, updating your monthly status assessment, adding attachments, and running standard, pre-built reports. PARS 102 Presentation PARS 102 Workbook PARS 103 - Updating Projects and Reporting

15

PARS II Phased Project Reporting Process, V-2013-03-14 Page 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phased Project Reporting Process, V-2013-03-14 Page 1 Phased Project Reporting Process, V-2013-03-14 Page 1 PARS II Process Document PROJECT PHASING (MULTIPLE CD-2 FROM SINGLE CD-1) PURPOSE The purpose of this document is to describe the process of entering, managing, and reporting projects in PARS II that adopted Phasing approach. SCOPE This process applies to projects that are managed as a larger program through CD1 but are executed in phases with parts of the projects reaching CD2 approvals earlier than the main project. PROCESS The main goal of the process is to ensure that as new projects are created for various phases of the original CD1 program, DOE portfolio is not overstated in portfolio reports and to ensure that linking is retained in PARS II between original CD1 program and resulting CD2 project phases.

16

PARS II FAQ  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V1.4.1 (June 25, 2011) 1 V1.4.1 (June 25, 2011) 1 PARS II Project Assessment and Reporting System Frequently Asked Questions (Click on a Question to go to Its Answer) General PARS II Project Information Q: What is the motivation, purpose and expected benefit from the PARS II system? Q: Where can I go to find out information on PARS II? Accessing and Using PARS II Q: Where can I go to access PARS II? Q: How do I obtain a PARS II User ID and Password? Q: PARS II will not allow me to log-in, it just keeps displaying the login window for User ID and Password. What should I do? Q: Upon log-in, I do not see a list of my projects. What should I do? Q: I am a FPD tracking a project and it does not appear on my project list. What should I do? Q: Upon log-in, I receive a white screen. What should I do?

17

Report 20.3: Stress Testing of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

A small sample of each of the Application Summary Report 20 PAR38 lamp types underwent stress testing that included substantial temperature and humidity changes, electrical variation, and vibration. The results do not directly address expected lifetime, but can be compared with one another, as well as with benchmark conventional products, to assess the relative robustness of the product designs. (24 pages, December 2014)

18

K-Area and Par Pond Sewage Sludge Application Sites groundwater monitoring report: Second quarter 1993  

SciTech Connect

During second quarter 1993, samples from the three monitoring wells at the K-Area site (KSS series) and the three monitoring wells at the Par Pond site (PSS series) were analyzed for constituents required by South Carolina Department of Health and Environmental Control Construction Permit 13,173 and for other constituents as part of the Savannah River Site (SRS) Groundwater Monitoring Program. This report describes monitoring results that exceeded the final Primary Drinking Water Standards (PDWS) or the SRS flagging criteria. During second quarter 1993, no constituents exceeded the final PDWS or any other flagging criteria at the K-Area and Par Pond Sewage Sludge Application Sites. During first quarter 1993, aluminum and iron exceeded the SRS Flag 2 criteria in one or more of the KSS and the PSS wells. These constituents were not analyzed second quarter 1993. In the KSS well series, the field measurement for alkalinity ranged as high as 35 mg/L in well KSS 1D. Alkalinity measurements were zero in the PSS wells, except for a single measurement of 1 mg/L in well PSS 1D. Historical and current water-level elevations at the K-Area Sewage Sludge Application Site indicate that the groundwater flow direction is south to southwest (SRS grid coordinates). The groundwater flow direction at the Par Pond Sewage Sludge Application Site could not be determined second quarter 1993.

Not Available

1993-10-01T23:59:59.000Z

19

Project Plan 7930 Cell G PaR Remote Handling System Replacement  

SciTech Connect

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

Kinney, Kathryn A [ORNL

2009-10-01T23:59:59.000Z

20

U.S. Department of Energy Project Assessment and Reporting System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Assessment and Reporting System U U s s e e r r G G u u i i d d e e PARS II Release 8.0.20120308 Department of Energy June 27, 2012 June 27, 2012 (V2.1) PARS II User Guide i This page left blank intentionally. June 27, 2012 (V2.1) PARS II User Guide ii Title Page Document Name: PARS II User Guide Document Version: V2.1 Publication Date: June 22, 2012 Software Release: 8.0.20120308 Revised by: Marc Cree, ActioNet Inc. Reviewed by: Clifford Mock, ActioNet Inc. Dennis Stoner, ActioNet Inc. Approval: _________________________________ John Makepeace, DOE APM MA-60 June 27, 2012 (V2.1) PARS II User Guide iii This page left blank intentionally. June 27, 2012 (V2.1) PARS II User Guide iv Change Control Page

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

PARS II Change Request (CR) Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title: Phone #: Office/Symbol: Email: CHANGE TYPE: Defect: New Requirement: PRIORITY: PARS II Change Request Form (APR 2011) PARS II Change Request (CR) Form 1 = Prevents the accomplishment of an essential PARS-II capability 3 = Adversely affects the accomplishment of an essential PARS-II capability, but a work-around solution is known 4 = Results in User / Operator inconvenience or annoyance, but does not affect an essential PARS-II capability 5 = Any other effect 1) Detailed description of problem/need. (If possible, provide project #(s) you are working with). PROBLEM/CHANGE DESCRIPTION: 2) Where in system defect is seen or where new functionality is required (i.e., which screen, which report). Screenshots (as separate attachments) are helpful.

22

Microsoft Word - PARS II 102 Training Workbook V1.0.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Assessment and Reporting System PARS II 102 Monthly Updating and Reporting Training Workbook V1.0 Department of Energy May 10, 2010 May 10, 2010 PARS II 102 Monthly Updating and Reporting V1.0 ii May 10, 2010 PARS II 102 Monthly Updating and Reporting V1.0 iii Table of Contents OVERSIGHT and ASSESSMENT ........................................................................................................ 1 Exercise 1 Find and View a Project ............................................................................................. 1 Sort the Project List ................................................................................................................. 3

23

PARS II | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Management » Information Systems » PARS II Operational Management » Information Systems » PARS II PARS II Welcome to PARS II PARS II is the Department's official "System of Record" for capital asset project performance information. Because PARS II uses the same data as maintained in our contractors' project management systems, everyone from the Federal Project Director's staff to the Secretary of Energy will have easy access to the same data. The PARS II software application is managed by the MA Office of Engineering and Construction Management and is used by federal and contractor personnel across the nation to record and track the progress of major construction and environmental cleanup projects. Questions or comments about PARS II should be directed to the PARS II Help Desk via email at i-Manage.eas@hq.doe.gov or by calling 301-903-2500

24

Contractor-Specific Documentation & Information in PARS II  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor-Specific Documentation & Information in PARS II Contractor-Specific Documentation & Information in PARS II DOE Office of Acquisition and Project Management established guidelines for documentation that should be available within PARS II through contractor-specific records that are not linked to any specific project within PARS II. This guidance is applicable only to those contractors who are currently executing Active Post CD-2 Capital Asset Construction Project(s) that are reported in PARS II. Table below outlines specific documents that should be attached to the contractor record in PARS II as well as the party responsible for ensuring contractor record contains each specific document. DOCUMENT NAME DOCUMENT DESCRIPTION UPLOAD RESPONSIBILITY EVMS Systems Description Current contractor EVMS Systems Description document with all

25

PARS II TRAINING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Viewing and Reporting 1 Viewing and Reporting Training Workbook V1.0 Department of Energy May 10, 2010 May 10, 2010 PARS II 101 Viewing and Reporting V1.0 ii May 10, 2010 PARS II 101 Viewing and Reporting V1.0 iii Table of Contents OVERSIGHT and ASSESSMENT ........................................................................................................ 1 Exercise 1 Find and View a Project ............................................................................................. 1 Sort the Project List ................................................................................................................. 3 Select a Project ....................................................................................................................... 3

26

PARS_UserManualV3t5.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management, Budget, and Evaluation (OMBE) Management, Budget, and Evaluation (OMBE) Office of Engineering and Construction Management (OECM) March, 2005 User Manual version 3.5 Project Assessment and Reporting System (PARS) Table of Contents 1. INTRODUCTION ................................................................................................................... 6 1.1. WHAT IS PARS? .................................................................................................................6 1.1.1. Web Enabled Database.................................................................................................. 6 1.1.2. Reporting System........................................................................................................... 6 1.1.3. Assessment System.........................................................................................................

27

SYSTEM SAFETY PROGRESS REPORT,  

E-Print Network (OSTI)

SYSTEM SAFETY PROGRESS REPORT, ALSEP Array E NO. ATM 1034 1 PAGE REV. NO. OF 3 DATE 26 July 1971 This A TM documents the progress of the System Safety Program for ALSEP Array E. -~/ Prepared by: · /~t:A~.., Approved by: W. · Lavin, Jr System Safety Engineer / /' J. P. ~/ es, Supervisor · , ALSEF Support

Rathbun, Julie A.

28

PARS II Training Materials | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARS II Training Materials PARS II Training Materials PARS II Training Materials PARS II presentation hand-outs and step-by-step "how to" exercises for each course are available for download. Users who are attending Web classes should download these documents prior to attending the class. PARS 102 - Monthly Updating and Reporting Introduction to PARS II, finding and selecting projects in your domain, viewing Oversight and Assessment (OA) data, viewing Contractor Project Performance (CPP) dashboards, updating your monthly status assessment, adding attachments, and running standard, pre-built reports. PARS 102 Presentation PARS 102 Workbook PARS 103 - Updating Projects and Reporting Introduction to PARS II, finding and selecting projects in your domain, entering new projects into PARS II, entering and editing Oversight and

29

K-Area and Par Pond Sewage Sludge Application Sites groundwater monitoring report, Third quarter 1992  

SciTech Connect

During third quarter 1992, the three wells at the K-Area Sewage Sludge Application Site (KSS wells) and the three wells at the Par Pond Sewage Sludge Application Site (PSS wells) were sampled for analyses required each quarter or annually by South Carolina Department of Health and Environmental Control Construction Permit 13,173 and for base-neutral/acid semivolatile constituents. None of the analytical results exceeded standards.

Thompson, C.Y.

1993-01-01T23:59:59.000Z

30

PARS II New Contractor Information for Interconnection Security Agreement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Contractor Information for Interconnection Security Agreement New Contractor Information for Interconnection Security Agreement V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System (PARS) II System Owner and the contractor sign an Interconnection Security Agreement (ISA). The requirement for an Interconnection Security Agreement can be found on page 182 of the PCSP. The ISA template is available for review on the PARS II portal (http://management.energy.gov/online_resources/pars2.htm) under Contractor Documents. Before the contractor begins sending data to PARS II, DOE will send the ISA to the contractor for review and signature. In order to prepare the ISA for review and signature, the PARS II Support Team needs

31

Integrated system design report  

SciTech Connect

The primary objective of the integrated system test phase is to demonstrate the commercial potential of a coal fueled diesel engine in its actual operating environment. The integrated system in this project is defined as a coal fueled diesel locomotive. This locomotive, shown on drawing 41D715542, is described in the separate Concept Design Report. The test locomotive will be converted from an existing oil fueled diesel locomotive in three stages, until it nearly emulates the concept locomotive. Design drawings of locomotive components (diesel engine, locomotive, flatcar, etc.) are included.

Not Available

1989-07-01T23:59:59.000Z

32

PARS II Phased Project Reporting Process, V-2014-04-07 Page 1  

Office of Environmental Management (EM)

II Phased Project Reporting Process, V-2014-04-07 Page 4 are excluded from GAO Metrics calculations. Therefore, only the following reporting requirements apply: * Project must...

33

PARS II Data Extraction Utility Version 8.0.20130510 Release Notes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARS II Data Extraction Utility PARS II Data Extraction Utility Version 8.0.20130510 Release Notes The Department of Energy (DOE) is pleased to announce the newest version of the DOE PARS II Data Extraction Utility, version 8.0.20130510. The Extraction Utility is used for retrieving project management data from a variety of source systems for upload into the DOE Project Assessment and Reporting System (PARS II). This release is a minor update and incorporates a number of new features and updates primarily focused to improve the existing functionality. Specifically, this version includes enhancements for sites and contractors using Deltek COBRA 4X/5.0 for the Earned Value (EV) Management system to provide EV data to DOE via PARS II upload. The quality of each DOE PARS II Extraction Utility release is of primary consideration at the

34

CALiPER Report 20.3: Robustness of LED PAR38 Lamps  

SciTech Connect

Three samples of 40 of the Series 20 PAR38 lamps underwent multi-stress testing, whereby samples were subjected to increasing levels of simultaneous thermal, humidity, electrical, and vibrational stress. The results do not explicitly predict expected lifetime or reliability, but they can be compared with one another, as well as with benchmark conventional products, to assess the relative robustness of the product designs. On average, the 32 LED lamp models tested were substantially more robust than the conventional benchmark lamps. As with other performance attributes, however, there was great variability in the robustness and design maturity of the LED lamps. Several LED lamp samples failed within the first one or two levels of the ten-level stress plan, while all three samples of some lamp models completed all ten levels. One potential area of improvement is design maturity, given that more than 25% of the lamp models demonstrated a difference in failure level for the three samples that was greater than or equal to the maximum for the benchmarks. At the same time, the fact that nearly 75% of the lamp models exhibited better design maturity than the benchmarks is noteworthy, given the relative stage of development for the technology.

Poplawski, Michael E.; Royer, Michael P.; Brown, Charles C.

2014-12-31T23:59:59.000Z

35

Text-Alternative Version: CALiPER Report Series 20 on LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

Michael Royer, Lighting Engineer, Pacific Northwest National Laboratory: The CALiPER program looks at typical LED lamp performance attributes. As we've gone through the progression of reports, we...

36

Computerized Accident Incident Reporting System  

Energy.gov (U.S. Department of Energy (DOE))

The Computerized Accident/Incident Reporting System is a database used to collect and analyze DOE and DOE contractor reports of injuries, illnesses, and other accidents that occur during DOE...

37

LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The following CALiPER reports provide detailed analysis of LED PAR38 lamp performance, covering basic performance characteristics as well as subjective evaluation of beam, shadow, and color quality. Pending reports will offer analysis on flicker, dimming and power quality characteristics; stress testing; and lumen and chromaticity maintenance. These reports are intended to educate the industry on market trends, potential issues, and important areas for improvement.

38

Par Pond Fish, Water, and Sediment Chemistry  

SciTech Connect

The objectives of this report are to describe the Par Pond fish community and the impact of the drawdown and refill on the community, describe contaminant levels in Par Pond fish, sediments, and water and indicate how contaminant concentrations and distributions were affected by the drawdown and refill, and predict possible effects of future water level fluctuations in Par Pond.

Paller, M.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Wike, L.D.

1996-06-01T23:59:59.000Z

39

Report 20.4: Lumen and Chromaticity Maintenance of LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy (DOE) CALiPER program has been purchasing and testing general illumination solid-state lighting (SSL) products since 2006. CALiPER relies on standardized photometric testing (following the Illuminating Engineering Society of North America [IES] approved method LM-79-081) conducted by accredited, independent laboratories. Results from CALiPER testing are available to the public via detailed reports for each product or through summary reports, which assemble data from several product tests and provide comparative analyses. Increasingly, CALiPER investigations also rely on new test procedures that are not industry standards; these experiments provide data that is essential for understanding the most current issues facing the SSL industry.

40

DOE CALiPER Program, Report 20.1 Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps  

SciTech Connect

This report focuses on human-evaluated characteristics, including beam quality, shadow quality, and color quality. Using a questionnaire that included rank ordering, opinions on 27 of the Report 20 PAR38 lamps were gathered during a demonstration event for members of the local Illuminating Engineering Society (IES) chapter. This was not a rigorous scientific experiment, and the data should not be extrapolated beyond the scope of the demonstration. The results suggest that many of the LED products compared favorably to halogen PAR38 benchmarks in all attributes considered. LED lamps using a single-emitter design were generally preferred for their beam quality and shadow quality, and the IES members ranking of color quality did not always match the rank according to the color rendering index (CRI).

Royer, Michael P.; Poplawski, Michael E.; Miller, Naomi J.

2013-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

NERSC System Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Usage Reports Batch Job Statistics See queue wait times, hours used, top users and other summary statistics for jobs run at NERSC (login required). Read More » Parallel Job Statistics (Cray aprun) $RestfulQuery4... Read More » Hopper Hours Used Hours used per day on Hopper. Read More » Edison Hours Used Hours used per day on Hopper. Read More » Carver Hours Used Hours used per day on Carver. Read More » Historical Data Hopper Job Size Charts This charts shows the fraction of hours used on Hopper in each of 5 job-core-size bins. 2013 2012 . 2011 . This chart shows the fraction of hours used on Hopper by jobs using greater than 16,384 cores. 2013 2012 ... Read More » Edison Job Size Charts This charts shows the fraction of hours used on Edison in each of 5

42

PARS II 104 Contractor Monthly Upload  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 7, 2011 (V1.3) July 7, 2011 (V1.3) PARS II 104 Contractor Monthly Upload 2 July 7, 2011 (V1.3) PARS II 104 Contractor Monthly Upload Course Objectives * Upon completion of this course, users will be able to: - Navigate in the PARS II application - Select a Project to update - Update Project data by performing * An Upload of the latest monthly project performance data extracted from the contractor's local Earned Value Management System (EVMS) * Replace the current or a prior monthly upload in response to feedback or to correct data - Verify the success of the upload - View and interpret the import log generated by the upload process 3 July 7, 2011 (V1.3) PARS II 104 Contractor Monthly Upload Overview PARS II 4 July 7, 2011 (V1.3) PARS II 104 Contractor Monthly Upload PARS II Overview * Commercial-off-the-shelf (COTS) product

43

PARS II Course Descriptions | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Descriptions Descriptions PARS II Course Descriptions Sign up for PARS 102 or PARS 103, depending on your project assessment role and function. PARS 104 will be offered to site contractors as part of Dekker's Contractor deployment training. # Course Name Course Description Intended Audience PARS 102 Monthly Updating and Reporting Duration: 4 hrs Introduction to PARS II, finding and selecting projects in your domain, viewing Oversight and Assessment (OA) data, viewing Contractor Project Performance (CPP) dashboards, updating your monthly status assessment, adding attachments, and running standard, pre-built reports. Individuals who do not require monthly update training will be excused approximately one half hour early. FPD and Program staff who update the OA Monthly Status, but not other OA data.

44

Microsoft Word - PARS II Process Document - Close Period 2013...  

Office of Environmental Management (EM)

the process of preparing the APM Deputy Secretary Monthly Report and closing the DOE Reporting Period in PARS II. SCOPE This process applies to the Headquarters Office of...

45

Faraday rotation system. Topical report  

SciTech Connect

The Faraday Rotation System (FRS) is one of the advanced laser-based diagnostics developed at DIAL to provide support for the demonstration of prototype-scale coal-fired combustion magnetohydrodynamic (MHD) electrical power generation. Intended for application in the MHD channel, the system directly measures electron density through a measurement of the induced rotation in the polarization of a far infrared laser beam after passing through the MHD flow along the magnetic field lines. A measurement of the induced polarization ellipticity provides a measure of the electron collision frequency which together with the electron density gives the electron conductivity, a crucial parameter for MHD channel performance. The theory of the measurements, a description of the system, its capabilities, laboratory demonstration measurements on seeded flames with comparison to emission absorption measurements, and the current status of the system are presented in this final report.

Bauman, L.E.; Wang, W.

1994-07-01T23:59:59.000Z

46

PARS II 102 Training Workbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Monthly Updating and Reporting 2 Monthly Updating and Reporting Training Workbook V8.0.20101108 Department of Energy March 30, 2011 March 30, 2011 PARS II 102 Monthly Updating and Reporting V8.0.20101108 ii Table of Contents OVERSIGHT and ASSESSMENT ........................................................................................................ 1 Exercise 1 - Find and View a Project............................................................................................ 1 Sort the Project List ................................................................................................................. 3 Select a Project ........................................................................................................................ 4 View a Project ......................................................................................................................... 4

47

PARS II On Hold Projects, V-2013-04-02 Page 1 PARS II Process Document  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On Hold Projects, V-2013-04-02 Page 1 On Hold Projects, V-2013-04-02 Page 1 PARS II Process Document ON HOLD PROJECTS - Place On Hold, Re-Activate, and Cancel PURPOSE The purpose of this document is to describe the process of placing active pre CD-2 capital asset projects on hold, removing projects from hold through re-activation or cancellation, and reporting of these projects in PARS II. SCOPE This process applies to active pre CD-2 capital asset projects and On Hold Pre CD-2 Capital Asset Projects only that were identified by the project team and approved by Acquisition Executive (AE), or Secretarial Acquisition Executive (SAE) for Major Systems Projects, as on hold. PROCESS The goal of the process is to ensure adherence to rules identified by Change Review Board (CRB) for placing

48

Glossary of Screen Labels for PARS II V1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Glossary 1 Glossary 1 Glossary of Screen Labels for PARS II V1.0.0 Goal The primary goal of this glossary is to help PARS II end users understand the items of data that they are viewing or entering on their PARS II application screens. It does not provide technical information on the schema of the PARS II database. A separate PARS II Data Dictionary document is being provided for PARS II users who need such technical information. Overview This document consists of a table defining each data label displayed on PARS II screens. It is divided into sections by PARS II screen title. To find the meaning of a data item, first find the section describing the relevant screen, then find the particular screen label description. The sections are listed in order of the major functional area of the PARS II System:

49

Noncompliance Tracking System Registration and Reporting  

NLE Websites -- All DOE Office Websites (Extended Search)

Noncompliance Tracking System Registration and Reporting Office of Enforcement and Oversight NTS Reporting NTS Registration (For new registration and password changes) REGISTRATION INFORMATION Registrants for the Noncompliance Tracking System (NTS) with an ACTIVE ACCOUNT for the HSS Reporting Systems: Occurrence Reports & Processing System (ORPS), Computerized Accident/Incident Reporting System (CAIRS), Suspect Counterfeit Items (SCI), or the Daily Occurrence (DO) reports can use the same credentials to access NTS. Please access NTS REPORTING. Registrants who DO NOT have an HSS Reporting Systems account, or who have not accessed their account within the past six months MUST REGISTER for a NTS account. Please register at: HSS Reporting Systems Registration. If you need additional information or assistance in registering, please contact HSS User Support.

50

Performance Assessment Report Domain CHP System  

E-Print Network (OSTI)

Performance Assessment Report for the Domain CHP System November 2005 By Burns & McDonnell Engineering #12;Domain CHP System Performance Assessment Report for the Packaged Cooling, Heating and Power

Oak Ridge National Laboratory

51

PC Electronic Data Reporting Option (PEDRO) System  

NLE Websites -- All DOE Office Websites (Extended Search)

System Released: February 22, 2011 Download Pedro Application Patch Archive Background The PC Electronic Data Reporting Option, or PEDRO, system enables users to enter Energy...

52

Smart Grid System Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Report System Report Smart Grid System Report This annex presents papers covering each of the 20 metrics identified in Section 2.1. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone. The list of metrics is derived from the material developed at the Smart Grid Implementation Workshop. The objective of the metric development process was to distill the best ideas into a small number of metrics with a reasonable chance of measurement and assessment. Smart Grid System Report More Documents & Publications 2009 Smart Grid System Report (July 2009) 2010 Smart Grid System Report (February 2012) Statement of Patricia Hoffman, Acting Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy Before the

53

Information Systems | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Systems Information Systems Information Systems Project Assessment and Reporting System (PARS II) PARS II is the Department's official "System of Record" for capital asset project performance information. Because PARS II uses the same data as maintained in our contractors' project management systems, everyone from the Federal Project Director's staff to the Secretary of Energy will have easy access to the same data. The PARS II software application is managed by the MA Office of Acquisition and Project Management and is used by federal and contractor personnel across the nation to record and track the progress of major construction and environmental cleanup projects. Questions or comments about PARS II should be directed to the PARS II Help Desk via email at i-Manage.eas@hq.doe.gov or by calling 301-903-2500

54

Noncompliance Tracking System Registration and Reporting | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

account. Please register at: EA Reporting Systems Registration. If you need additional information or assistance in registering, please contact EA User Support. Contact Lisa German...

55

CALiPER Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps  

Energy.gov (U.S. Department of Energy (DOE))

This December 3, 2013 webinar explored the findings of CALiPER 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps and discussed what attributes to...

56

Built Systems Report Back #2  

E-Print Network (OSTI)

in Water) Strategy #2 Assets: · Wastewater Treatment System Strategy: · Generate project SOW to the north #12;Elevator Speech · Top 3 primary short-term / long-term climate change impacts to SSC/system 1. #12;How Adaptation Strategy Development will Continue · Provide monthly updates to COD on climate

57

Computerized Accident/Incident Reporting System  

NLE Websites -- All DOE Office Websites (Extended Search)

Accident Recordkeeping and Reporting Accident Recordkeeping and Reporting Accident/Incident Recordkeeping and Reporting CAIRS logo Computerized Accident Incident Reporting System CAIRS Database The Computerized Accident/Incident Reporting System is a database used to collect and analyze DOE and DOE contractor reports of injuries, illnesses, and other accidents that occur during DOE operations. Injury and Illness Dashboard The Dashboard provides an alternate interface to CAIRS information. The initial release of the Dashboard allows analysis of composite DOE-wide information and summary information by Program Office, and site. Additional data feature are under development. CAIRS Registration Form CAIRS is a Government computer system and, as such, has security requirements that must be followed. Access to the

58

2014 Smart Grid System Report (August 2014) | Department of Energy  

Energy Savers (EERE)

14 Smart Grid System Report (August 2014) 2014 Smart Grid System Report (August 2014) The Department of Energy has developed this biennial report to Congress in compliance with...

59

Microsoft Word - Configuring Workstations for use with the PARS II System.V3.0.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30/2010 30/2010 1 PROCEDURES 1.1 Introduction Most users will be comfortable with contacting their IT Helpdesk for completing the instructions below. However, If you have Admin rights on your workstation, and are comfortable with making configuration changes to it, you may follow these directions yourself. 1.2 Installation of Dekker, Ltd. ActiveX Control 1. Log onto the workstation to be configured using an ID/Password that can perform administrative functions on the workstation being configured (e.g. Install software, add Active-X controls). Note that administrative access is only required for initial workstation configuration, not ongoing operation of the PARS II application on the workstation. 2. Check hardware, software and network requirements as identified in section 2 below.

60

Intelligent wind power prediction systems final report  

E-Print Network (OSTI)

Intelligent wind power prediction systems ­ final report ­ Henrik Aalborg Nielsen (han (FU 4101) Ens. journal number: 79029-0001 Project title: Intelligent wind power prediction systems #12;#12;Intelligent wind power prediction systems 1/36 Contents 1 Introduction 6 2 The Wind Power Prediction Tool 7 3

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

2007 NET SYSTEM POWER REPORT STAFFREPORT  

E-Print Network (OSTI)

-2007.......................................................................5 Figure 3: Natural Gas and Coal Shares of Net System Power Mix Become Larger 1999-2007.....7 ListCALIFORNIA ENERGY COMMISSION 2007 NET SYSTEM POWER REPORT STAFFREPORT April 2008 CEC-200 .................................................................................................................. 1 Net System Power Findings

62

Army Energy and Water Reporting System Assessment  

SciTech Connect

There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

Deprez, Peggy C.; Giardinelli, Michael J.; Burke, John S.; Connell, Linda M.

2011-09-01T23:59:59.000Z

63

Energy Systems Group Annual Report  

E-Print Network (OSTI)

of the major state agencies. The second task is to evaluate the feasibility of applying Cogeneration in selected state agencies and institutions. The third major task includes developing energy efficiency standards for all new buildings constructed... LABORATORY CONSORTIUM Acquisition and improvements of the Energy Systems Laboratory (ESL) have created a unique method for industries to become further involved in university programs. A consortium is being organized to provide direction and financing...

Anand, N. K.; Caton, J.; Heffington, W. M.; O'Neal, D. L.; Somasundaram, S.; Turner, W. D.

1986-01-01T23:59:59.000Z

64

Class 3 Tracking and Monitoring System Report  

SciTech Connect

The objective of Class 3 tracking system are to assist DOE in tracking and performance and progress of these projects and to capture the technical and financial information collected during the projects' monitoring phase. The captured information was used by DOE project managers and BDM-Oklahoma staff for project monitoring and evaluation, and technology transfer activities. The proposed tracking system used the Class Evaluation Executive Report (CLEVER), a relation database for storing and disseminating class project data; GeoGraphix, a geological and technical analysis and mapping software system; the Tertiary Oil Recovery Information System (TORIS) database; and MS-Project, a project management software system.

Safely, Eugene; Salamy, S. Phillip

1999-11-29T23:59:59.000Z

65

Management summary report. Auditing and financial system  

SciTech Connect

Increased leasing of Federal lands for energy exploration will add to the regulatory and administrative responsibilities of the USGS's Conservation Division. Similar responsibilities for Indian lands will arise. The objectives of the Conservation Division is to reduce the regulatory burden on industry while effectively and efficiently discharging its responsibility. This Management Summary Report represents the completion of the Preliminary Systems Design of the Auditing and Financial System, and is the first phase of the Improved Royalty Management Program (IRMP). Work reported includes: a Functional Specifications Report; Technical Specifications Report; Installation Plan; and a cost/benefit analysis. The potential benefits to be realized from the IRMP are significant and include: increased royalty receipts; more timely availability of funds; increased productivity of personnel; reduced regulatory burden on private industry; tighter security over information collected; reduced exposure to fraud and abuse; and better control over activities and funds.

Feldmiller, W.H.

1980-01-01T23:59:59.000Z

66

2014 Smart Grid System Report Now Available | Department of Energy  

Energy Savers (EERE)

4 Smart Grid System Report Now Available 2014 Smart Grid System Report Now Available August 28, 2014 - 4:43pm Addthis The 2014 Smart Grid System Report, which is intended to...

67

PAR | OpenEI  

Open Energy Info (EERE)

PAR PAR Dataset Summary Description (Abstract): Photosynthetically active radiation in kWh/m2/day for 1 year organized into cells with 10km x 10km (Purpose): The BRASIL-SR model and the SPRING software (both developed by INPE -National Institute for Space Research) were used to produce the dataset and SHAPE files Source INPE (National Institute for Space Research) and LABSOLAR (Laboratory of Solar Energy/Federal University of Santa Catarina) - Brazil Date Released August 08th, 2009 (5 years ago) Date Updated August 08th, 2009 (5 years ago) Keywords INPE LABSOLAR PAR solar SWERA UNEP Data application/zip icon Download Shapefile (zip, 10.4 MiB) text/csv icon Download Data (csv, 15.7 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage

68

Merchant vessel advanced power systems. Final report  

SciTech Connect

This study identifies and evaluates potential highly advanced propulsion power plants which may have marine applications beyond the year 2000. Various promising current technologies were screened and an evaluation of each plant concept and its suitability for use as a merchant ship propulsion system is contained in this report.

Baham, G.J.; Swensson, G.

1982-01-01T23:59:59.000Z

69

PARS II TRAINING | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRAINING PARS II TRAINING BASICS TRAINING WORKBOOK PARS II TRAINING More Documents & Publications PARS II PARS II Training Workbook (Course 103) PARSIIUserGuideV1.0Draft.pdf...

70

Noncompliance Tracking System Registration and Reporting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Noncompliance Tracking System Registration and Reporting Noncompliance Tracking System Registration and Reporting Noncompliance Tracking System Registration and Reporting NTS Reporting NTS Registration (For new registration) REGISTRATION INFORMATION Once NTS account access has been granted, registrants for the Noncompliance Tracking System (NTS) with an ACTIVE ACCOUNT for the HSS Reporting Systems: Occurrence Reports & Processing System (ORPS), Computerized Accident/Incident Reporting System (CAIRS), Suspect Counterfeit Items (SCI), or the Daily Occurrence (DO) reports can use the same credentials to access NTS. Please access NTS REPORTING. Registrants who DO NOT have an HSS Reporting Systems account, or who have not accessed their account within the past six months MUST REGISTER for a NTS account. Please register at: HSS Reporting Systems Registration.

71

Test report : Princeton power systems prototype energy storage system.  

SciTech Connect

The Department of Energy Office of Electricity (DOE/OE), Sandia National Laboratory (SNL) and the Base Camp Integration Lab (BCIL) partnered together to incorporate an energy storage system into a microgrid configured Forward Operating Base to reduce the fossil fuel consumption and to ultimately save lives. Energy storage vendors will be sending their systems to SNL Energy Storage Test Pad (ESTP) for functional testing and then to the BCIL for performance evaluation. The technologies that will be tested are electro-chemical energy storage systems comprised of lead acid, lithium-ion or zinc-bromide. Princeton Power Systems has developed an energy storage system that utilizes lithium ion phosphate batteries to save fuel on a military microgrid. This report contains the testing results and some limited analysis of performance of the Princeton Power Systems Prototype Energy Storage System.

Rose, David Martin; Schenkman, Benjamin L.; Borneo, Daniel R.

2013-08-01T23:59:59.000Z

72

ParCAT: Parallel Climate Analysis Toolkit  

SciTech Connect

Climate science is employing increasingly complex models and simulations to analyze the past and predict the future of Earth s climate. This growth in complexity is creating a widening gap between the data being produced and the ability to analyze the datasets. Parallel computing tools are necessary to analyze, compare, and interpret the simulation data. The Parallel Climate Analysis Toolkit (ParCAT) provides basic tools to efficiently use parallel computing techniques to make analysis of these datasets manageable. The toolkit provides the ability to compute spatio-temporal means, differences between runs or differences between averages of runs, and histograms of the values in a data set. ParCAT is implemented as a command-line utility written in C. This allows for easy integration in other tools and allows for use in scripts. This also makes it possible to run ParCAT on many platforms from laptops to supercomputers. ParCAT outputs NetCDF files so it is compatible with existing utilities such as Panoply and UV-CDAT. This paper describes ParCAT and presents results from some example runs on the Titan system at ORNL.

Smith, Brian E [ORNL; Steed, Chad A [ORNL; Shipman, Galen M [ORNL; Ricciuto, Daniel M [ORNL; Thornton, Peter E [ORNL; Wehner, Michael [Lawrence Berkeley National Laboratory (LBNL); Williams, Dean N. [Lawrence Livermore National Laboratory (LLNL)

2013-01-01T23:59:59.000Z

73

Experience report with the Alignment Diagnostic System  

SciTech Connect

Since 2009 an Alignment Diagnostic System (ADS) has been operating at the undulator of the new Linac Coherent Light Source at SLAC National Accelerator Laboratory. The undulator spans a distance of 132 meters and is structured into 33 segments. Each segment is equipped with four hydrostatic leveling sensors and four wire position monitors. This report describes the set up and reflects the experience gained with the ADS.

Gassner, Georg; /SLAC

2011-03-03T23:59:59.000Z

74

Hydrogen energy systems studies. Final technical report  

SciTech Connect

The results of previous studies suggest that the use of hydrogen from natural gas might be an important first step toward a hydrogen economy based on renewables. Because of infrastructure considerations (the difficulty and cost of storing, transmitting and distributing hydrogen), hydrogen produced from natural gas at the end-user`s site could be a key feature in the early development of hydrogen energy systems. In the first chapter of this report, the authors assess the technical and economic prospects for small scale technologies for producing hydrogen from natural gas (steam reformers, autothermal reformers and partial oxidation systems), addressing the following questions: (1) What are the performance, cost and emissions of small scale steam reformer technology now on the market? How does this compare to partial oxidation and autothermal systems? (2) How do the performance and cost of reformer technologies depend on scale? What critical technologies limit cost and performance of small scale hydrogen production systems? What are the prospects for potential cost reductions and performance improvements as these technologies advance? (3) How would reductions in the reformer capital cost impact the delivered cost of hydrogen transportation fuel? In the second chapter of this report the authors estimate the potential demand for hydrogen transportation fuel in Southern California.

Ogden, J.M.; Kreutz, T.; Kartha, S.; Iwan, L.

1996-08-13T23:59:59.000Z

75

2010 Smart Grid System Report (February 2012) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid System Report (February 2012) Smart Grid System Report (February 2012) 2010 Smart Grid System Report (February 2012) Section 1302 of Title XIII of the Energy Independence and Security Act of 2007 directs the Secretary of Energy to "...report to Congress concerning the status of smart grid deployments nationwide and any regulatory or government barriers to continued deployment." This document satisfies this directive and represents the second installment of this report to Congress, which is to be updated biennially. 2010 Smart Grid System Report 2010 Smart Grid System Report Appendix A 2010 Smart Grid System Report Appendix B More Documents & Publications 2009 Smart Grid System Report (July 2009) Smart Grid System Report Statement of Patricia Hoffman, Acting Assistant Secretary for Electricity

76

Final Report: Enhanced Geothermal Systems Technology Phase II...  

Open Energy Info (EERE)

Valley, New Mexico Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Final Report: Enhanced Geothermal Systems Technology Phase II: Animas Valley, New...

77

presentee par Damien Bensimon  

E-Print Network (OSTI)

TH`ESE pr´esent´ee par Damien Bensimon pour obtenir le grade de Docteur de l'Universit´e Joseph Lavagna Directrice de th`ese M. Natan Andrei Examinateur M. Patrick Azaria Rapporteur M. Alex Hewson Rapporteur M. Andr´es Jerez Examinateur Th`ese Pr´epar´ee au sein du Service de Physique Statistique, Magn

Boyer, Edmond

78

How to Submit a Request for a PARS II Account | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account The account access process for PARS II relies on the Department of Energy's MIS Application Gateway system to verify the requestor's identity and to approve his/her request for access to a specific DOE Headquarters application, such as PARS II. Once approved by the MIS Application Gateway, the PARS II Help Desk Administrator will assign a new PARS II account to the requestor. Please follow the steps listed below to apply for a PARS II account. 1. If the federal employee or contractor does not already have an account with the Department of Energy's MIS Application Gateway, then the requestor must apply for an account and be approved by a local federal sponsor. To

79

Microsoft Word - Configuring Workstations for use with the PARS...  

Energy Savers (EERE)

use with the PARS II System.V3.0.doc More Documents & Publications Idaho Operations AMWTP Fact Sheet Heating Ventilation and Air Conditioning Efficiency CERTIFIED REALTY SPECIALIST...

80

2014 Annual Merit Review Results Report - Hybrid Vehicle Systems...  

Energy Savers (EERE)

Hybrid Vehicle Systems Technologies 2014 Annual Merit Review Results Report - Hybrid Vehicle Systems Technologies Merit review of DOE Vehicle Technologies research activities...

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

W-026, operational test report isokenetic stack effluent monitoring system  

SciTech Connect

This Operational Test Report was performed to assure the Isokinetic Stack Effluent Monitoring System (ISEMS) operates in accordance with system design and specifications.

Bottenus, R.J.

1997-08-22T23:59:59.000Z

82

Potassium emission absorption system. Topical report 12  

SciTech Connect

The Potassium Emission Absorption System is one of the advanced optical diagnostics developed at Mississippi State University to provide support for the demonstration of prototype-scale coal-fired combustion magnetohydrodynamic (MHD) electrical power generation. Intended for application in the upstream of an MHD flow, the system directly measures gas temperature and neutral potassium atom number density through spectroscopic emission absorption techniques. From these measurements the electron density can be inferred from a statistical equilibrium calculation and the electron conductivity in the MHD channel found by use of an electron mobility model. The instrument has been utilized for field test measurements on MHD facilities for almost a decade and has been proven to provide useful measurements as designed for MHD nozzle, channel, and diffuser test sections. The theory of the measurements, a system description, its capabilities, and field test measurement results are reported here. During the development and application of the instrument several technical issues arose which when addressed advanced the state of the art in emission absorption measurement. Studies of these issues are also reported here and include: two-wavelength measurements for particle-laden flows, potassium D-line far wing absorption coefficient, bias in emission absorption measurements arising from dirty windows and misalignments, non-coincident multiwavelength emission absorption sampling errors, and lineshape fitting for boundary layer flow profile information. Although developed for NLHD application, the instrument could be applied to any high temperature flow with a resonance line in the 300 to 800 nm range, for instance other types of flames, rocket plumes or low temperature plasmas.

Bauman, L.E.

1995-04-01T23:59:59.000Z

83

Microsoft Word - PARS II Letter of Introduction 20091119d.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Enterprise Solutions, LLC Energy Enterprise Solutions, LLC 20440 Century Blvd. Suite 150 Germantown, Maryland 20874 Phone: 301-916-0050 Fax: 301-916-0066 www.eesllc.net November 19, 2009 Contractor Person Name Contractor Company Address 1 Address 2 City, State, Zip Dear [Mr./Mrs.] ________, Energy Enterprise Solutions (EES), under contract to the Department of Energy's (DOE) Office of Engineering and Construction Management (OECM), is preparing to deploy the next generation of the Project Assessment and Reporting System (PARS). This new system, called PARS II, will be used by Federal Project Directors, Program Office staff, and OECM analyst personnel to enter status assessments, forecasts and other data. It will automate the upload of contractor earned value and schedule data, and will provide the federal staff with a common view

84

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Elevator Drive Systems Energy Consumption Study Report  

E-Print Network (OSTI)

Energy Consumption Study Report Benny ChunYin Chan University of British Columbia EECE 492 April 6th the current status of the subject matter of a project/report". #12;Elevator Drive Systems Energy Consumption Study Report April 2012 0 2012 Elevator Drive Systems Energy Consumption Study Report Benny CY Chan UBC

85

Occurrence Reporting and Processing System | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Occurrence Reporting and Processing System Occurrence Reporting and Processing System Occurrence Reporting and Processing System The Department of Energy's Occurrence Reporting Program provides timely notification to the DOE complex of events that could adversely affect: public or DOE worker health and safety, the environment, national security, DOE's safeguards and security interests, functioning of DOE facilities, or the Department's reputation. DOE analyzes aggregate occurrence information for generic implications and operational improvements. The Occurrence Reporting Program directives are DOE Order 232.2, Occurrence Reporting and Processing of Operations Information, and DOE Standard DOE-STD-1197-2011, Occurrence Reporting Causal Analysis. Contact Ashley Ruocco for information and assistance on

86

Federal Energy Management Program: EISA Compliance Tracking System Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

EISA Compliance EISA Compliance Tracking System Reports and Data to someone by E-mail Share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Facebook Tweet about Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Twitter Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Google Bookmark Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Delicious Rank Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on Digg Find More places to share Federal Energy Management Program: EISA Compliance Tracking System Reports and Data on AddThis.com... Requirements by Subject Requirements by Regulation Notices & Rules

87

Pentek metal coating removal system: Baseline report  

SciTech Connect

The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

NONE

1997-07-31T23:59:59.000Z

88

Commercial Cooling Par Engineering: Proposed Penalty (2013-CE-5312) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Penalty (2013-CE-5312) Proposed Penalty (2013-CE-5312) Commercial Cooling Par Engineering: Proposed Penalty (2013-CE-5312) January 31, 2013 DOE alleged in a Notice of Proposed Civil Penalty that Commercial Cooling Par Engineering failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have been tested and meet the applicable energy conservation standards. This civil penalty notice advises the company of the potential penalties and DOE's administrative process, including the company's right to a hearing. Commercial Cooling Par Engineering: Proposed Penalty (2013-CE-5312) More Documents & Publications Commercial Cooling Par Engineering: Order (2013-CE-5312)

89

ARM - Datastreams - pars2  

NLE Websites -- All DOE Office Websites (Extended Search)

Datastreamspars2 Datastreamspars2 Documentation Data Quality Plots ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : PARS2 OTT Parsivel2 Laser Disdrometer Active Dates 2012.09.24 - 2013.09.26 Measurement Categories Atmospheric State, Cloud Properties Originating Instrument Laser Disdrometer (LDIS) Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable Altitude above mean sea level m alt Base time in Epoch seconds since 1970-1-1 0:00:00 0:00 base_time Class size width mm class_size_width ( particle_size ) Diameter of largest drop observed mm diameter_max ( time ) Diameter of smallest drop observed mm diameter_min ( time )

90

Ocean energy conversion systems annual research report  

SciTech Connect

Alternative power cycle concepts to the closed-cycle Rankine are evaluated and those that show potential for delivering power in a cost-effective and environmentally acceptable fashion are explored. Concepts are classified according to the ocean energy resource: thermal, waves, currents, and salinity gradient. Research projects have been funded and reported in each of these areas. The lift of seawater entrained in a vertical steam flow can provide potential energy for a conventional hydraulic turbine conversion system. Quantification of the process and assessment of potential costs must be completed to support concept evaluation. Exploratory development is being completed in thermoelectricity and 2-phase nozzles for other thermal concepts. Wave energy concepts are being evaluated by analysis and model testing with present emphasis on pneumatic turbines and wave focussing. Likewise, several conversion approaches to ocean current energy are being evaluated. The use of salinity resources requires further research in membranes or the development of membraneless processes. Using the thermal resource in a Claude cycle process as a power converter is promising, and a program of R and D and subsystem development has been initiated to provide confirmation of the preliminary conclusion.

Not Available

1981-03-01T23:59:59.000Z

91

Status Report, Essential System Functionality - January 2006 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Status Report, Essential System Functionality - January 2006 Report on Essential System Functionality In 2004 and 2005, the Office of Independent Oversight, within the Office of Security and Safety Performance Assurance, performed ten evaluations of essential system functionality (ESF). These ESF reviews are highly technical, detailed engineering evaluations of selected essential systems within one or more facilities at each site. This report summarizes the observations and insights from these reviews. Although most essential safety systems that were reviewed were well maintained, tested, and operated, there were significant weaknesses in some aspects of engineering design and analysis that, for some safety systems,

92

2010 Smart Grid System Report Available (February 2012) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 Smart Grid System Report Available (February 2012) 2010 Smart Grid System Report Available (February 2012) 2010 Smart Grid System Report Available (February 2012) February 24, 2012 - 2:58pm Addthis The Department of Energy has submitted the 2010 Smart Grid System Report in response to Section 1302 of Title XIII of the Energy Independence and Security Act (EISA), which directs the Secretary of Energy to report to Congress concerning the status of smart grid deployments nationwide and any regulatory or government barriers to continued deployment. This is the second installment of this report to Congress. A smart grid uses digital technology to improve the reliability, security, efficiency, and environmental impact of the electricity system, from large generation through the delivery systems to electricity consumers.

93

Microsoft Word - PARS II Process Document - Close Period 2013-04-29 _FINAL_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARS II APM DepSec Monthly Report & Close Period, V-2013-04-29 Page 1 PARS II APM DepSec Monthly Report & Close Period, V-2013-04-29 Page 1 PARS II Process Document APM DEPSEC MONTHLY REPORT & CLOSE PERIOD PURPOSE The purpose of this document is to describe the process of preparing the APM Deputy Secretary Monthly Report and closing the DOE Reporting Period in PARS II. SCOPE This process applies to the Headquarters Office of Acquisition and Project Management (HQ OAPM) and its support contractors as the organization that prepares the monthly reports and closes the monthly reporting period. The process covers data validation and verification; running, distributing and archiving of reports; and

94

Acceptance test report for the mobile color camera system  

SciTech Connect

The purpose of this report is to present test data recorded during acceptance testing of the Mobile Color Camera System (MCCS).

Castleberry, J.L., Fluor Daniel Hanford

1997-02-27T23:59:59.000Z

95

2014 Smart Grid System Report (August 2014)  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has developed this biennial report to Congress in compliance with legislative language set forth in Section 1302 of the Energy Independence and Security Act of 2007. This report is designed to provide an update on the status of smart grid deployments nationwide, technological developments, and barriers that may affect the continued adoption of the technology.

96

Honeywell modular automation system acceptance test report  

SciTech Connect

This document provides the results of the Acceptance Test Procedure for the Honeywell Modular Automation System.

Cunningham, L.T., Westinghouse Hanford

1996-06-14T23:59:59.000Z

97

Radiation Exposure Monitoring Systems Data Reporting Guide  

Energy.gov (U.S. Department of Energy (DOE))

Instructions for preparing occupational exposure data for submittal to the Radiation Exposure Monitoring System (REMS) repository.

98

ESTADO DO PAR PODER JUDICIRIO  

E-Print Network (OSTI)

ordem alfabética. 1.1.1 LOCAL: Tribunal de Justiça do Estado do Pará ­ Av. Almirante Barroso nº 3089

Maier, Rudolf Richard

99

Hydrogen Storage Systems Analysis Meeting: Summary Report, March 29, 2005  

Energy.gov (U.S. Department of Energy (DOE))

This report highlights DOE’s systems analysis work related to hydrogen storage materials and process development, with a focus on models of on-board and off-board hydrogen storage systems.

100

Ris Energy Report 7 Future low carbon energy systems  

E-Print Network (OSTI)

Risø Energy Report 7 Future low carbon energy systems Reprint of summary and recommendations Risø-R-1651(EN) October 2008 Edited by Hans Larsen and Leif Sønderberg Petersen #12;Risø Energy Report 7 Preface This Risø Energy Report, the seventh of a series that began in 2002, takes as its point

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Design of radiographic enhancement systems. Final report  

SciTech Connect

Preliminary specifications and designs are given for two radiographic enhancement systems. The first system is a portable system designed to be carried with EOD teams to enhance the contrast of low-density, low-contrast radiographs made with existing EOD radiographic equipment. The second system contains both image-enhancement and improved radiographic equipment and is designed to be carried aboard commercial or military aircraft in an air-transportable pod. Expected production costs and equipment selection are included.

Hayford, D.T.

1986-09-01T23:59:59.000Z

102

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby-

103

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 100% 1 1063

104

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 Standby NA

105

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 30% NA 1062

106

Microsoft PowerPoint - PARS II Deployment Discussion 20090416.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARS II PARS II Deployment Discussion John Makepeace (OECM) Kai Mong (EES), Judith Bernsen (EES/PMC) April 16, 2009 2 Purpose * Review inclusion/exclusion of projects * Discuss the proposed schedule for transitioning projects PARS II Timeline 3 Target Dates * May 2009 - DOE-wide announcement * May 2009 - Contact Group 1 * Sep 2009 - Error free files from Group 1 * Dec 2009 - Group 1 repeatable process established * Feb 2010 - Groups 1-3 begin reporting * Sep 2010 - Group 9 begins reporting 4 5 Exclusion Criteria * Project was excluded if * Planned CD-4 date was on or before Sep 30 2010 * Project was at CD-0 or CD-1 with no planned CD-2 date on or before Sep 30 2010 * Project at CD-3 and more than 50% complete (schedule) * Project TPC < $20M 6 Grouping Criteria * Projects were grouped using the following

107

Computerized Accident Incident Reporting System | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and other accidents that occur during DOE operations. CAIRS is a Government computer system and, as such, has security requirements that must be followed. Access to the...

108

2006 NET SYSTEM POWER REPORT COMMISSIONREPORT  

E-Print Network (OSTI)

hydroelectricity. This report uses the same definition for small hydroelectric facilities, 30 megawatts or less, as is used under the state's Renewable Portfolio Standard,. Electricity from large hydroelectric facilities changes, because NW hydroelectric energy varies from year to year and because the power plant fleet within

109

PARS II Process Document - Project Phasing | Department of Energy  

Energy Savers (EERE)

PARS II Process Document - Project Phasing.pdf More Documents & Publications Proposed Data Elements for PARS II Web Application Slide 1 PARS II Standard Operating Procedure (SOP)...

110

Proposed Data Elements for PARS II Web Application | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Data Elements for PARS II Web Application Proposed Data Elements for PARS II Web Application Proposed Data Elements for PARS II Web Application More Documents &...

111

PARS II - Integrated Project Team Meeting | Department of Energy  

Energy Savers (EERE)

Meeting PARS II - Integrated Project Team Meeting More Documents & Publications PARS II 104 Contractor Monthly Upload Proposed Data Elements for PARS II Web Application Slide 1...

112

EMERGING RENEWABLES PROGRAM SYSTEMS VERIFICATION REPORT  

E-Print Network (OSTI)

to evaluate system performance and to verify whether the documentation and rebate paid were consistent the proper rebate amount. However, 16 systems had equipment installed that differed notably from final documentation and would require additional investigation to determine if the correct rebate was paid. KEYWORDS

113

Groundwater Remediation Systems Quarterly Operations Report  

E-Print Network (OSTI)

.......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 for the Carbon Tetrachloride system was completed in 2010. ** EDB has only been detected in the influent at trace and Recirculate Tritium 4 Operate- 9 Standby- 7 100% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC

114

Advanced lubrication systems and materials. Final report  

SciTech Connect

This report described the work conducted at the National Institute of Standards and Technology under an interagency agreement signed in September 1992 between DOE and NIST for 5 years. The interagency agreement envisions continual funding from DOE to support the development of fuel efficient, low emission engine technologies in terms of lubrication, friction, and wear control encountered in the development of advanced transportation technologies. However, in 1994, the DOE office of transportation technologies was reorganized and the tribology program was dissolved. The work at NIST therefore continued at a low level without further funding from DOE. The work continued to support transportation technologies in the development of fuel efficient, low emission engine development. Under this program, significant progress has been made in advancing the state of the art of lubrication technology for advanced engine research and development. Some of the highlights are: (1) developed an advanced high temperature liquid lubricant capable of sustaining high temperatures in a prototype heat engine; (2) developed a novel liquid lubricant which potentially could lower the emission of heavy duty diesel engines; (3) developed lubricant chemistries for ceramics used in the heat engines; (4) developed application maps for ceramic lubricant chemistry combinations for design purpose; and (5) developed novel test methods to screen lubricant chemistries for automotive air-conditioning compressors lubricated by R-134a (Freon substitute). Most of these findings have been reported to the DOE program office through Argonne National Laboratory who manages the overall program. A list of those reports and a copy of the report submitted to the Argonne National Laboratory is attached in Appendix A. Additional reports have also been submitted separately to DOE program managers. These are attached in Appendix B.

Hsu, S.

1998-05-07T23:59:59.000Z

115

EISA Compliance Tracking System Reports and Data | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data October 8, 2013 - 2:06pm Addthis The Federal Energy Management Program (FEMP) provides links to reports and data illustrating Federal progress in meeting the requirements outlined in Section 432 of the Energy Independence and Security Act of 2007 (EISA) (42 U.S.C. 8253(f)) available through the EISA 432 Compliance Tracking System (CTS). EISA 432 CTS Data Levels Top-tier agency aggregates, representing all reported data subject to the EISA 432 requirements Facility-level detailed data that excludes information for facilities that have requested exemption from public disclosure for national-security purposes. Access Data Federal Government Compliance Overview: View key CTS metrics and aggregates

116

WRAP TRUPACT loading systems operational test report  

SciTech Connect

This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

117

Advanced Turbine Systems Program. Topical report  

SciTech Connect

The Allison Gas Turbine Division (Allison) of General Motors Corporation conducted the Advanced Turbine Systems (ATS) program feasibility study (Phase I) in accordance with the Morgantown Energy Technology Center`s (METC`s) contract DE-AC21-86MC23165 A028. This feasibility study was to define and describe a natural gas-fired reference system which would meet the objective of {ge}60% overall efficiency, produce nitrogen oxides (NO{sub x}) emissions 10% less than the state-of-the-art without post combustion controls, and cost of electricity of the N{sup th} system to be approximately 10% below that of the current systems. In addition, the selected natural gas-fired reference system was expected to be adaptable to coal. The Allison proposed reference system feasibility study incorporated Allison`s long-term experience from advanced aerospace and military technology programs. This experience base is pertinent and crucial to the success of the ATS program. The existing aeroderivative technology base includes high temperature hot section design capability, single crystal technology, advanced cooling techniques, high temperature ceramics, ultrahigh turbomachinery components design, advanced cycles, and sophisticated computer codes.

NONE

1993-03-01T23:59:59.000Z

118

Natural System Evaluation and Tool Development FY11 Progress Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural System Evaluation and Tool Development FY11 Progress Report Natural System Evaluation and Tool Development FY11 Progress Report Natural System Evaluation and Tool Development FY11 Progress Report The report describes selected aspects of progress for four major tasks: (1) development of a detailed R&D plan for natural system evaluation and tool development; (2) in-depth analsis of key attributes and new concepts identified in the R&D plan; (3) preliminary demonstration of new modeling and experimental tools; and (4) conceptual design of a databse for natural system evaluation. This includes discussions related to: 1) discrete fracture network simulation; 2) spatial heterogeneity in Kd; 3) literature review of radionuclide interactions with clay/clay minerals; 4) behavior of aqueous Pu(IV) and intrinsic Pu(IV) nanocolloids; 5) mechanical response of clay,

119

Release Notes: Version 8.0.20110608 of PARS II Release Date: 06/25/2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

| 1 | 1 Release Notes: Version 8.0.20110608 of PARS II Release Date: 06/25/2011 Section 1. System Enhancements CPP Upload Enhancement added - new functionality added that allows a System Administrator to select which CPP warnings appear or not appear in the Error/Warning report for a CPP upload o This functionality is available under Administration/Warning Configuration o When selected, the application will display a window with two columns: Projects and Warning Messages o User selects which project or projects for which they want to change the message display. o Then the user selects which messages from the list that they will not want to display in the report. Items checked do not display in the report as indicated by the message at the

120

PARSII - New Reports and Reports With New Reporting Folder Location  

Office of Environmental Management (EM)

active projects listing PrePost CD-2 and 's including RYG status. Multi-Project 3A Red-Yellow Project Status Report PARS Reports Monthly Reports For every project that has...

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Center for Power Electronics Systems 2014 ANNUAL REPORT  

E-Print Network (OSTI)

Systems at Virginia Tech is a research center dedicated to improving electrical power pro- cessing- orative research and education for creating advanced electric power processing systems of the highestCenter for Power Electronics Systems 2014 ANNUAL REPORT VIRGINIA TECH · BLACKSBURG, VIRGINIA #12

Beex, A. A. "Louis"

122

Research Report Determinism in Partially Ordered Production Systems  

E-Print Network (OSTI)

Research Report Determinism in Partially Ordered Production Systems Joseph M. Hellerstein IBM Production Systems Joseph M. Hellerstein IBM Almaden Research Center San Jose, CA 95120­6099 hellerst; Abstract The subtlety of interactions between rules in a production system has motivated research into ways

California at Irvine, University of

123

Autonomous microexplosives subsurface tracing system final report.  

SciTech Connect

The objective of the autonomous micro-explosive subsurface tracing system is to image the location and geometry of hydraulically induced fractures in subsurface petroleum reservoirs. This system is based on the insertion of a swarm of autonomous micro-explosive packages during the fracturing process, with subsequent triggering of the energetic material to create an array of micro-seismic sources that can be detected and analyzed using existing seismic receiver arrays and analysis software. The project included investigations of energetic mixtures, triggering systems, package size and shape, and seismic output. Given the current absence of any technology capable of such high resolution mapping of subsurface structures, this technology has the potential for major impact on petroleum industry, which spends approximately $1 billion dollar per year on hydraulic fracturing operations in the United States alone.

Engler, Bruce Phillip; Nogan, John; Melof, Brian Matthew; Uhl, James Eugene; Dulleck, George R., Jr.; Ingram, Brian V.; Grubelich, Mark Charles; Rivas, Raul R.; Cooper, Paul W.; Warpinski, Norman Raymond; Kravitz, Stanley H.

2004-04-01T23:59:59.000Z

124

Pentek concrete scabbling system: Baseline report; Summary  

SciTech Connect

The Pentek concrete scabbling system consists of the MOOSE{reg_sign} scabbler, the SQUIRREL{reg_sign}-I and SQUIRREL{reg_sign}-III scabblers, and VAC-PAC. The scabblers are designed to scarify concrete floors and slabs using cross section, tungsten carbide tipped bits. The bits are designed to remove concrete in 3/8 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation during the human factors assessment focused on two main areas: noise and dust.

NONE

1997-07-31T23:59:59.000Z

125

Generic Disposal System Modeling, Fiscal Year 2011 Progress Report |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disposal System Modeling, Fiscal Year 2011 Progress Report Disposal System Modeling, Fiscal Year 2011 Progress Report Generic Disposal System Modeling, Fiscal Year 2011 Progress Report The UFD Campaign is developing generic disposal system models (GDSM) of different disposal environments and waste form options. Currently, the GDSM team is investigating four main disposal environment options: mined repositories in three geologic media (salt, clay, and granite) and the deep borehole concept in crystalline rock (DOE 2010d). Further developed the individual generic disposal system (GDS) models for salt, granite, clay, and deep borehole disposal environments. GenericDisposalSystModelFY11.pdf More Documents & Publications Integration of EBS Models with Generic Disposal System Models TSPA Model Development and Sensitivity Analysis of Processes Affecting

126

2014 JASON Report: State of Stress in Engineered Subsurface Systems  

Energy.gov (U.S. Department of Energy (DOE))

A new report by an independent panel recommends that the Energy Department take a leading role in understanding subsurface systems to better address the nation’s energy and security issues. JASON –...

127

Stationary flywheel energy storage systems. Final report  

SciTech Connect

The aim of this system study is to find out industrial applications of Stationary Flywheel Energy Accumulators. The economic value for the consumer and the effects on the power supply grid should be investigated. As to overall economy, compensation of short time maximum power out-put seems to be more favorable at the power stations. An additional possibility for energy storage by flywheels is given where otherwise lost energy can be used effectively, according to the successful brake energy storage in vehicles. Under this aspect the future use of flywheels in wind-power-plants seems to be promising. Attractive savings of energy can be obtained by introducing modern flywheel technology for emergency power supply units which are employed for instance in telecommunication systems. Especially the application for emergency power supply, in power stations and in combination with wind energy converters needs further investigation.

Gilhaus, A.; Hau, E.; Gassner, G.; Huss, G.; Schauberger, H.

1982-01-01T23:59:59.000Z

128

PARS II Training | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Training PARS II Training PARS II training is delivered as traditional, instructor-led, hands-on classroom training, and also, as instructor-led Webinars with limited hands-on. In...

129

PARS II Training Schedule | Department of Energy  

Office of Environmental Management (EM)

will certify that user to receive a PARS II user account. PARSIITrainingSchedule03-06-2014.pdf More Documents & Publications Slide 1 Slide 1 PARS II Course Registration Form...

130

FORENSIC IDENTIFICATION REPORTING USING AUTOMATIC SPEAKER RECOGNITION SYSTEMS  

E-Print Network (OSTI)

FORENSIC IDENTIFICATION REPORTING USING AUTOMATIC SPEAKER RECOGNITION SYSTEMS J. Gonzalez to the bayesian approach for evidence analysis and forensic reporting. This approach, firmly established in other forensic areas as fingerprint, DNA or fiber analysis, suits the needs of both the court and the forensic

Autonoma de Madrid, Universidad

131

Harrison Radiator Division's Energy Management, Reporting and Accounting System  

E-Print Network (OSTI)

HARRISON RADIATOR DIVISION'S ENERGY MANAGEMENT, REPORTING and ACCOUNTING SYSTEM Ronald J. Goubeaux Harrison Radiator Division Lockport, New York ABSTRACT Energy management is essential for obtaining the lowest possible product..., farm equipment, small aircraft and other types of vehicles. The energy management, reporting and accounting system that is covered in this paper is operating in Harrison's West Complex of the New York Operations located in Lockport, Western...

Goubeaux, R. J.

132

Wetland plant communities, Galveston Bay system. Final report  

SciTech Connect

The report is the culmination of a field investigation of wetland plant communities, and is one phase of the project, Trends and Status of Wetland and Aquatic Habitats of the Galveston Bay System, Texas, sponsored by the Galveston Bay National Estuary Program. For purpose of the topical report, wetlands are defined and classified in terms of more classical definitions, for example, salt, brackish, and fresh marshes, in accordance with project requirements. More than 150 sites were examined in the Galveston Bay system.

White, W.A.; Paine, J.G.

1992-03-01T23:59:59.000Z

133

FY07 Final Report for Calibration Systems  

SciTech Connect

Remote infrared (IR) sensing provides a valuable method for detection and identification of materials associated with nuclear proliferation. Current challenges for remote sensors include minimizing the size, mass, and power requirements for cheaper, smaller, and more deployable instruments without affecting the measurement performance. One area that is often overlooked is sensor calibration design that is optimized to minimize the cost, size, weight, and power of the payload. Yet, an on-board calibration system is essential to account for changes in the detector response once the instrument has been removed from the laboratory. The Calibration Systems project at Pacific Northwest National Laboratory (PNNL) is aimed towards developing and demonstrating compact quantum cascade (QC) laser-based calibration systems for infrared sensor systems in order to provide both a spectral and radiometric calibration while minimizing the impact on the instrument payload. In FY05, PNNL demonstrated a multi-level radiance scheme that provides six radiance levels for an enhanced linearity check compared to the currently accepted two-point scheme. PNNL began testing the repeatability of this scheme using a cryogenically cooled, single-mode quantum cascade laser (QCL). A cyclic variation in the power was observed that was attributed to the thermal cycling of the laser's dewar. In FY06, PNNL continued testing this scheme and installed an auxiliary liquid nitrogen reservoir to limit the thermal cycling effects. Although better repeatability was achieved over a longer time period, power fluctuations were still observed due to the thermal cycling. Due to the limitations with the cryogenic system, PNNL began testing Fabry-Perot QCLs that operate continuous-wave (cw) or quasi-cw at room temperature (RT) in FY06. PNNL demonstrated a multi-level scheme that provides five radiance levels in 105 seconds with excellent repeatability. We have continued testing this repeatability in FY07. A burn-in effect appears in which the power increases over a certain time period. Repeatability better than 1%, however, is demonstrated for most of the radiance levels after this initial burn-in. In FY06, PNNL also began investigating a fiber-coupled RT QCL for a compact IR calibration source. PNNL demonstrated a uniform beam profile by measuring a time-averaged response and modulating the fiber optic with a motor to minimize the effects of speckle. In FY07, PNNL examined the power stability of fiber-coupled QCLs. Feedback appears to degrade the stability so that anti-reflective coatings for fibers may be essential. In FY07, PNNL continued to investigate the stability of room temperature QCLs as well as the measurement technique to provide a quantitative estimate for the measurement uncertainty. We designed and built a custom environmental enclosure to reduce the measurement uncertainty. After an initial burn-in, we have achieved uncertainties better than 0.1% for data collected over almost 100 hours of operation. We also built a bench-top system to demonstrate how the QC laser can be used to calibrate a microbolometer array and illustrated the importance of a multi-point calibration.

Myers, Tanya L.; Broocks, Bryan T.; Cannon, Bret D.; Ho, Nicolas

2007-12-01T23:59:59.000Z

134

Innovative technology summary report: Transportable vitrification system  

SciTech Connect

At the end of the cold war, many of the Department of Energy`s (DOE`s) major nuclear weapons facilities refocused their efforts on finding technically sound, economic, regulatory compliant, and stakeholder acceptable treatment solutions for the legacy of mixed wastes they had produced. In particular, an advanced stabilization process that could effectively treat the large volumes of settling pond and treatment sludges was needed. Based on this need, DOE and its contractors initiated in 1993 the EM-50 sponsored development effort required to produce a deployable mixed waste vitrification system. As a consequence, the Transportable Vitrification System (TVS) effort was undertaken with the primary requirement to develop and demonstrate the technology and associated facility to effectively vitrify, for compliant disposal, the applicable mixed waste sludges and solids across the various DOE complex sites. After 4 years of development testing with both crucible and pilot-scale melters, the TVS facility was constructed by Envitco, evaluated and demonstrated with surrogates, and then successfully transported to the ORNL ETTP site and demonstrated with actual mixed wastes in the fall of 1997. This paper describes the technology, its performance, the technology applicability and alternatives, cost, regulatory and policy issues, and lessons learned.

NONE

1998-09-01T23:59:59.000Z

135

Physics of Correlated Systems, Final Project Report  

SciTech Connect

The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

Greene, Chris H. [University of Colorado at Boulder] [University of Colorado at Boulder

2014-06-25T23:59:59.000Z

136

Guidelines for maintaining steam turbine lubrication systems. Final report  

SciTech Connect

Failures of steam turbine bearings and rotors cost the utility industry an estimated $150 million a year. A third of these failures involve contaminated lubricants or malfunctioning lubricant supply system components. This report, outlining a comprehensive surveillance program, presents guidelines for maintaining major elements in the turbine lubrication system.

Lamping, G.A.; Cuellar, J.P. Jr.; Silvus, H.S.; Barsun, H.F.

1986-07-01T23:59:59.000Z

137

Operational test report for 2706-T complex liquid transfer system  

SciTech Connect

This document is the Operational Test Report (OTR). It enters the Record Copy of the W-259 Operational Test Procedure (HNF-3610) into the document retrieval system. Additionally, the OTR summarizes significant issues associated with testing the 2706-T waste liquid transfer and storage system.

BENZEL, H.R.

1999-09-01T23:59:59.000Z

138

Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Held in Conjunction with the DOE Hydrogen Program Annual Merit Review Crystal Gateway Marriott, Arlington, VA June 11, 2008 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Elvin Yzugullu Sentech, Inc. July 18, 2008 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting June 11, 2008 Crystal Gateway Marriott, Arlington, VA Meeting Objectives This meeting was one of a continuing series of biannual meetings of the Hydrogen Storage Systems Analysis Working Group (SSAWG). The objective of these meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes for information exchange and to update the researchers on related

139

FY 2004 Annual Progress Report for Heavy Vehicle Systems Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

HEAVY HEAVY VEHICLE SYSTEMS OPTIMIZATION FreedomCAR and Vehicle Technologies Program U.S. Department of Energy FreedomCAR and Vehicle Technologies Program 1000 Independence Avenue, S.W. Washington, D.C. 20585-0121 FY 2004 Annual Progress Report for Heavy Vehicle Systems Optimization Energy Efficiency and Renewable Energy FreedomCAR and Vehicle Technologies Program Approved by Dr. Sidney Diamond Technology Area Development Specialist February 2005 Heavy Vehicle Systems Optimization Program FY 2004 Annual Report iii Contents Foreword by Dr. Sidney Diamond, FreedomCAR and Vehicle Technologies Program, Energy Efficiency and Renewable Energy, U.S. Department of Energy ................................. 1 I. Aerodynamic Drag Reduction......................................................................................................

140

Glossary of Screen Labels for PARS II V1  

Energy Savers (EERE)

1.0 PARS II System version number for U.S. Department of Energy. With Major.Minor.Patch fields Non-Entry Field V1.1.2 2 nd patch release after V1.1 V1.3.0 a minor...

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Waste retrieval sluicing system data acquisition system acceptance test report  

SciTech Connect

This document describes the test procedure for the Project W-320 Tank C-106 Sluicing Data Acquisition System (W-320 DAS). The Software Test portion will test items identified in the WRSS DAS System Description (SD), HNF-2115. Traceability to HNF-2115 will be via a reference that follows in parenthesis, after the test section title. The Field Test portion will test sensor operability, analog to digital conversion, and alarm setpoints for field instrumentation. The W-320 DAS supplies data to assist thermal modeling of tanks 241-C-106 and 241-AY-102. It is designed to be a central repository for information from sources that would otherwise have to be read, recorded, and integrated manually. Thus, completion of the DAS requires communication with several different data collection devices and output to a usable PC data formats. This test procedure will demonstrate that the DAS functions as required by the project requirements stated in Section 3 of the W-320 DAS System Description, HNF-2115.

Bevins, R.R.

1998-07-31T23:59:59.000Z

142

Smart Grid System Report U.S. Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Smart Grid System Report U.S. Department of Energy July 2009 SEC. 1302. SMART GRID SYSTEM REPORT The Secretary, acting through the Assistant Secretary of the Office of Electricity Delivery and Energy Reliability (referred to in this section as the "OEDER") and through the Smart Grid Task Force established in section 1303, shall, after consulting with any interested individual or entity as appropriate, no later than one year after enactment and every two years thereafter, report to Congress concerning the status of smart grid deployments nationwide and any regulatory or government barriers to continued deployment. The report shall provide the current status and prospects of smart grid development, including information on technology penetration, communications network capabilities,

143

Development of a comprehensive reporting system for a school reform organization: The Accelerated Schools Project  

E-Print Network (OSTI)

theoretical framework for the reporting system, (b) identified data that should be collected in the reporting system, (c) performed a field test with an expert panel of educational professionals, (d) developed a preliminary form of the reporting system, (e...

Stephens, Jennifer Anne

2006-04-12T23:59:59.000Z

144

Green Fluorescent Protein Reporter System with Transcriptional Sequence Heterogeneity for Monitoring the Interferon Response  

Science Journals Connector (OSTI)

...immediate free access to this article. Green Fluorescent Protein Reporter System with...validated a live cell-based enhanced green fluorescent protein (EGFP) reporter system...validated a live cell-based enhanced green fluorescent protein (EGFP) reporter system...

Linah Mahmoud; Maher Al-Saif; Haitham M. Amer; Mustafa Sheikh; Fahad N. Almajhdi; Khalid S. A. Khabar

2011-07-13T23:59:59.000Z

145

Power plant system assessment. Final report. SP-100 Program  

SciTech Connect

The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system.

Anderson, R.V.; Atkins, D.F.; Bost, D.S.; Berman, B.; Clinger, D.A.; Determan, W.R.; Drucker, G.S.; Glasgow, L.E.; Hartung, J.A.; Harty, R.B.

1983-10-31T23:59:59.000Z

146

Hydrogen Storage Systems Analysis Meeting: Summary Report, March 29, 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Storage Systems Analysis Meeting Hydrogen Storage Systems Analysis Meeting 955 L'Enfant Plaza North, SW, Suite 6000 Washington, DC 20024-2168 March 29, 2005 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory June 20, 2005 SUMMARY REPORT Hydrogen Storage Systems Analysis Meeting March 29, 2005 955 L'Enfant Plaza, North, SW, Suite 6000 Washington, DC 20024-2168 Meeting Objectives The objective of this meeting was to familiarize the DOE research community involved in hydrogen storage materials and process development with the systems analysis work being carried out within the DOE program. In particular, Argonne National Laboratory (ANL) has been tasked to develop models of on-board and off-board hydrogen storage systems based on the various materials and technologies being developed at the DOE Centers of Excellence and

147

Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Storage Systems Analysis Working Group Meeting Hydrogen Storage Systems Analysis Working Group Meeting Argonne DC Offices L'Enfant Plaza, Washington, DC December 4, 2007 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Kristin Deason Sentech, Inc. January 16, 2008 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting December 4, 2007 Argonne DC Offices, L'Enfant Plaza, Washington, DC Meeting Objectives This meeting was one of a continuing series of biannual meetings of the Hydrogen Storage Systems Analysis Working Group (SSAWG). The objective of these meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes for information exchange and to update the researchers on related developments within the DOE program. A major thrust of these meetings is to leverage

148

Contractor Performance Assessment Reporting System (CPARS) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Performance Assessment Reporting System (CPARS) Contractor Performance Assessment Reporting System (CPARS) Contractor Performance Assessment Reporting System (CPARS) The CPAR assesses a contractor's performance, both positive and negative, and provides a record on a given contract during a specified period of time. Each assessment must be based on objective data (or measurable, subjective data when objective data is not available) supportable by program and contract management data. The CPARS process is designed with a series of checks-and-balances to facilitate the objective and consistent evaluation of contractor performance. Both Government and contractor perspectives are captured on the CPAR form. The opportunity to review/comment on the CPAR by the designated Government and contractor personnel together makes a complete CPAR.

149

Engineered Barrier System performance requirements systems study report. Revision 02  

SciTech Connect

This study evaluates the current design concept for the Engineered Barrier System (EBS), in concert with the current understanding of the geologic setting to assess whether enhancements to the required performance of the EBS are necessary. The performance assessment calculations are performed by coupling the EBS with the geologic setting based on the models (some of which were updated for this study) and assumptions used for the 1995 Total System Performance Assessment (TSPA). The need for enhancements is determined by comparing the performance assessment results against the EBS related performance requirements. Subsystem quantitative performance requirements related to the EBS include the requirement to allow no more than 1% of the waste packages (WPs) to fail before 1,000 years after permanent closure of the repository, as well as a requirement to control the release rate of radionuclides from the EBS. The EBS performance enhancements considered included additional engineered components as well as evaluating additional performance available from existing design features but for which no performance credit is currently being taken.

Balady, M.A.

1997-01-14T23:59:59.000Z

150

Prsente par Seyed Mohammad SADEGHZADEH  

E-Print Network (OSTI)

THESE Présentée par Seyed Mohammad SADEGHZADEH (Ph.D. de Sharif University of Technology) Téhéran'amortissement des oscillations d'un réseau électrique à l'aide de SMES et de SSSC Composition du jury: Monsieur y sont représentées. Je ne saurais pas oublier mes professeurs de "Sharif University of Technology

Paris-Sud XI, Université de

151

PARS 3.0 Data Model Dictionary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Table/Field Names and Definitions Table/Field Names and Definitions PARS 3.0 Page 1 13-Jan-03 Database Table Table Description 1. Project ID Project identification table containing information about the project. This is usually the first table of information configured with project data when creating a new project. Field Field Definition External Source 1. DOE Project ID DOE project identification code as reported in the project data sheet (e.g., 97-D-102). Project Data Sheet 2. DOE Project Name Project Name (e.g., National Ignition Facility). Project Data Sheet 3. Managing Office Code Alphanumberic code for DOE Office providing oversight and direction (e.g. EM, NNSA, SC, etc.). Select from a picklist Project Data Sheet 4. Site Code Alphanumeric abbreviation for Project Site (e.g., LLNL

152

2007 Heavy Vehicle Systems Optimization Program Annual Report  

NLE Websites -- All DOE Office Websites (Extended Search)

HEAVY VEHiclE SYSTEMS HEAVY VEHiclE SYSTEMS OPTiMiZATiON PROGRAM V EH icl E T E c HNO l OG i ES P ROGRAM Less dependence on foreign oil today, and transition to a petroleum-free, emissions-free vehicle tomorrow. 2 0 0 7 a n n u a l p r o g r e s s r e p o r t U.S. Department of Energy Vehicle Technologies Program 1000 Independence Avenue, S.W. Washington, DC 20585-0121 FY 2007 Annual Progress Report for Heavy Vehicle Systems Optimization Program Submitted to: U.S. Department of Energy Energy Efficiency and Renewable Energy Vehicle Technologies Program Advanced Vehicle Technology Analysis and Evaluation Lee Slezak, Technology Manager Heavy Vehicle Systems Optimization Program FY 2007 Annual Report CONTENTS I. AERODYNAMIC DRAG REDUCTION ........................................................................... 1

153

Hydrgoen Storage Systems Analysis Working Group Meeting Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Systems Analysis Working Group Meeting Systems Analysis Working Group Meeting 2007 Hydrogen Program Annual Review Crystal Gateway Marriott, Arlington, VA May 17, 2007 SUMMARY REPORT Compiled by Romesh Kumar Argonne National Laboratory and Elvin Yuzugullu Sentech, Inc. June 28, 2007 SUMMARY REPORT Hydrogen Storage Systems Analysis Working Group Meeting May 17, 2007 Crystal Gateway Marriott, Arlington, VA Meeting Objectives This meeting was one of a continuing series of biannual meetings of this Working Group. The objective of these meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes for information exchange and to update the researchers on related developments within the DOE program. A major thrust of these meetings is to leverage expertise, complement related work of different individuals and

154

Annex A Metrics for the Smart Grid System Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annex A Annex A Metrics for the Smart Grid System Report A.iii Table of Contents Introduction ........................................................................................................................................... A.1 Metric #1: The Fraction of Customers and Total Load Served by Real-Time Pricing, Critical Peak Pricing, and Time-of-Use Pricing ........................................................................................ A.2 Metric #2: Real-Time System Operations Data Sharing ...................................................................... A.9 Metric #3: Standard Distributed Resource Connection Policies .......................................................... A.18 Metric #4: Regulatory Recovery for Smart Grid Investments ............................................................. A.23

155

Energy management systems for commercial buildings. Final report  

SciTech Connect

Increasing costs of energy and the development of lower cost microelectronics have created a growing market for energy management systems applied to commercial buildings. This report examines the spectrum of EMS available and how they are used in different types of commercial buildings. An informal survey of 197 commercial building owners provided additional information on EMS installed and the energy savings attributed to those systems. Evaluations were performed to identify types of EMS appropriate to specific types of commercial buildings.

Woody, A.W.

1986-02-01T23:59:59.000Z

156

Federal Energy Management Program: EISA Compliance Tracking System Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

EISA Compliance Tracking System Reports and Data EISA Compliance Tracking System Reports and Data EISA 432 Overview EISA requires Federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each Federal agency must designate an energy manager responsible for implementing the requirements at each covered facility. Comprehensive energy and water evaluations are to be performed at each covered facility every four years to identify potential energy and water efficiency and conservation measures. EISA requires agencies to report progress toward these requirements in CTS, along with: Estimated cost and savings for projects implemented in covered facilities Measured savings for implemented projects

157

Simulated coal gas MCFC power plant system verification. Final report  

SciTech Connect

The objective of the main project is to identify the current developmental status of MCFC systems and address those technical issues that need to be resolved to move the technology from its current status to the demonstration stage in the shortest possible time. The specific objectives are separated into five major tasks as follows: Stack research; Power plant development; Test facilities development; Manufacturing facilities development; and Commercialization. This Final Report discusses the M-C power Corporation effort which is part of a general program for the development of commercial MCFC systems. This final report covers the entire subject of the Unocal 250-cell stack. Certain project activities have been funded by organizations other than DOE and are included in this report to provide a comprehensive overview of the work accomplished.

NONE

1998-07-30T23:59:59.000Z

158

Report on the Workshop on Operational Text Classification Systems  

E-Print Network (OSTI)

, user needs, personnel and training, resource demands, maintaining effectiveness over time, and inteReport on the Workshop on Operational Text Classification Systems (OTC-01) David D. Lewis on Operational Text Classification (OTC-01), occurred September 13, 2001 in New Orleans, Louisiana, US. It was co

Sebastiani, Fabrizio

159

A Technical Report of ITTC's Networking and Distributed Systems Laboratory  

E-Print Network (OSTI)

Design Improvements Mihir Thaker Joseph Evans James Roberts Technical Report ITTC-FY2000-TR-15663 evaluates the performance of two widely used MAC protocols, namely Reservation-TDMA (R- TDMA) and Multi. It was observed that HTTP based applications are suited to an R-TDMA system while FTP based applications perform

Kansas, University of

160

Nuclear Materials Management and Safeguards System Reporting and Data Submission  

Directives, Delegations, and Requirements

The manual provides clear and detailed instructions and procedures for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE 5633.3B. Canceled by DOE M 474.1-2A.

1998-02-10T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

System Advisor Model: Flat Plate Photovoltaic Performance Modeling Validation Report  

SciTech Connect

The System Advisor Model (SAM) is a free software tool that performs detailed analysis of both system performance and system financing for a variety of renewable energy technologies. This report provides detailed validation of the SAM flat plate photovoltaic performance model by comparing SAM-modeled PV system generation data to actual measured production data for nine PV systems ranging from 75 kW to greater than 25 MW in size. The results show strong agreement between SAM predictions and field data, with annualized prediction error below 3% for all fixed tilt cases and below 8% for all one axis tracked cases. The analysis concludes that snow cover and system outages are the primary sources of disagreement, and other deviations resulting from seasonal biases in the irradiation models and one axis tracking issues are discussed in detail.

Freeman, J.; Whitmore, J.; Kaffine, L.; Blair, N.; Dobos, A. P.

2013-12-01T23:59:59.000Z

162

Technology verification phase. Dynamic isotope power system. Final report  

SciTech Connect

The Phase I requirements of the Kilowatt Isotope Power System (KIPS) program were to make a detailed Flight System Conceptual Design (FSCD) for an isotope fueled organic Rankine cycle power system and to build and test a Ground Demonstration System (GDS) which simulated as closely as possible the operational characteristics of the FSCD. The activities and results of Phase II, the Technology Verification Phase, of the program are reported. The objectives of this phase were to increase system efficiency to 18.1% by component development, to demonstrate system reliability by a 5000 h endurance test and to update the flight system design. During Phase II, system performance was improved from 15.1% to 16.6%, an endurance test of 2000 h was performed while the flight design analysis was limited to a study of the General Purpose Heat Source, a study of the regenerator manufacturing technique and analysis of the hardness of the system to a laser threat. It was concluded from these tests that the GDS is basically prototypic of a flight design; all components necessary for satisfactory operation were demonstrated successfully at the system level; over 11,000 total h of operation without any component failure attested to the inherent reliability of this type of system; and some further development is required, specifically in the area of performance. (LCL)

Halsey, D.G.

1982-03-10T23:59:59.000Z

163

Preoperational test report, primary ventilation condenser cooling system  

SciTech Connect

This represents the preoperational test report for the Primary Ventilation Condenser Cooling System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system uses a closed chilled water piping loop to provide offgas effluent cooling for tanks AY101, AY102, AZ1O1, AZ102; the offgas is cooled from a nominal 100 F to 40 F. Resulting condensation removes tritiated vapor from the exhaust stack stream. The piping system includes a package outdoor air-cooled water chiller with parallel redundant circulating pumps; the condenser coil is located inside a shielded ventilation equipment cell. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

Clifton, F.T.

1997-10-29T23:59:59.000Z

164

Test report : Raytheon / KTech RK30 energy storage system.  

SciTech Connect

The Department of Energy Office of Electricity (DOE/OE), Sandia National Laboratories (SNL) and the Base Camp Integration Lab (BCIL) partnered together to incorporate an energy storage system into a microgrid configured Forward Operating Base to reduce the fossil fuel consumption and to ultimately save lives. Energy storage vendors will be sending their systems to SNL Energy Storage Test Pad (ESTP) for functional testing and then to the BCIL for performance evaluation. The technologies that will be tested are electro-chemical energy storage systems comprising of lead acid, lithium-ion or zinc-bromide. Raytheon/KTech has developed an energy storage system that utilizes zinc-bromide flow batteries to save fuel on a military microgrid. This report contains the testing results and some limited analysis of performance of the Raytheon/KTech Zinc-Bromide Energy Storage System.

Rose, David Martin; Schenkman, Benjamin L.; Borneo, Daniel R.

2013-10-01T23:59:59.000Z

165

Dynamic Systems Analysis Report for Nuclear Fuel Recycle  

SciTech Connect

This report examines the time-dependent dynamics of transitioning from the current United States (U.S.) nuclear fuel cycle where used nuclear fuel is disposed in a repository to a closed fuel cycle where the used fuel is recycled and only fission products and waste are disposed. The report is intended to help inform policy developers, decision makers, and program managers of system-level options and constraints as they guide the formulation and implementation of advanced fuel cycle development and demonstration efforts and move toward deployment of nuclear fuel recycling infrastructure.

Brent Dixon; Sonny Kim; David Shropshire; Steven Piet; Gretchen Matthern; Bill Halsey

2008-12-01T23:59:59.000Z

166

Building America Systems Integration Research Annual Report: FY 2012  

SciTech Connect

This document is the Building America FY2012 Annual Report, which includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

Gestwick, M.

2013-05-01T23:59:59.000Z

167

An Evaluation of Departmental Radiation Oncology Incident Reports: Anticipating a National Reporting System  

Science Journals Connector (OSTI)

Purpose Systems to ensure patient safety are of critical importance. The electronic incident reporting systems (IRS) of 2 large academic radiation oncology departments were evaluated for events that may be suitable for submission to a national reporting system (NRS). Methods and Materials All events recorded in the combined IRS were evaluated from 2007 through 2010. Incidents were graded for potential severity using the validated French Nuclear Safety Authority (ASN) 5-point scale. These incidents were categorized into 7 groups: (1) human error, (2) software error, (3) hardware error, (4) error in communication between 2 humans, (5) error at the human-software interface, (6) error at the software-hardware interface, and (7) error at the human-hardware interface. Results Between the 2 systems, 4407 incidents were reported. Of these events, 1507 (34%) were considered to have the potential for clinical consequences. Of these 1507 events, 149 (10%) were rated as having a potential severity of ?2. Of these 149 events, the committee determined that 79 (53%) of these events would be submittable to a NRS of which the majority was related to human error or to the human-software interface. Conclusions A significant number of incidents were identified in this analysis. The majority of events in this study were related to human error and to the human-software interface, further supporting the need for a NRS to facilitate field-wide learning and system improvement.

Stephanie A. Terezakis; Kendra M. Harris; Eric Ford; Jeff Michalski; Theodore DeWeese; Lakshmi Santanam; Sasa Mutic; Hiram Gay

2013-01-01T23:59:59.000Z

168

Operational test report -- Project W-320 cathodic protection systems  

SciTech Connect

Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.

Bowman, T.J.

1998-06-16T23:59:59.000Z

169

PARS II CPP Upload Template File | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

teProjectTemplate.zip More Documents & Publications Proposed Data Elements for PARS II Web Application PARS II - Integrated Project Team Meeting PARS II End-of-Month Checklist...

170

PARSII - New Reports and Reports With New Reporting Folder Location  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report Name Previous Location New Location Brief Description Multi-Project or Single Project Report 2A Project Summary by Program PARS Reports Monthly Reports All active projects listing Pre/Post CD-2 $ and #'s including RYG status. Multi-Project 3A Red-Yellow Project Status Report PARS Reports Monthly Reports For every project that has been assessed by the OECM Analyst as being either Red or Yellow a worksheet is created that includes the OECM Analyst's written assessment of the project. The FPD, Site and Contractor with its EVM Certification Status are listed in the report. All appropriate EVM metrics, TPC values and CD approved dates as of the current OA Status Date are a part of the report. Multi-Project 4B Projects Post-CD-2 PARS Reports Monthly Reports

171

Radiological Control Technical Position, Regarding Use of Newer Dose Terms in the Occurrence Reporting and Processing System  

Energy.gov (U.S. Department of Energy (DOE))

Technical Position Clarifying Dose Reporting in the Occurrence Reporting and Processing System - RCTP-09-03

172

Design and synthesis of reactive separation systems. Final report  

SciTech Connect

During the last decade there has been a rapid upturn in interest in reactive distillation. The chemical process industry recognizes the favorable economics of carrying out reaction simultaneously with distillation for certain classes of reacting systems, and many new processes have been built based on this technology. Interest is also increasing by academics and software vendors. Systematic design methods for reactive distillation systems have only recently begun to emerge. In this report we survey the available design techniques and point out the contributions made by our group at the University of Massachusetts.

Doherty, M.F.

1992-12-31T23:59:59.000Z

173

Solar hot water system installed at Mobile, Alabama. Final report  

SciTech Connect

This final report describes the solar energy hot water system installed at LaQuinta Motor Inn Inc., at Mobile, Alabama. The building is a 122 unit motel. The system consists of six rows of ten collectors and three rows of eleven collectors (1990 square feet) mounted on the roof. Griswald flow control valves were installed to regulate the flow to each row. Two Heliotrope electronic thermometers with a combined capability of measuring the temperatures of 22 different locations were installed for monitoring purposes. Engineering drawings, component specifications, and operator instructions are included.

None

1980-10-01T23:59:59.000Z

174

Environmental Systems Research Candidates FY-01 Annual Report  

SciTech Connect

The Environmental Systems Research Candidates (ESRC) Program ran from April 2000 through September 2001 as part of the Environmental Systems Research and Analysis (ESRA) Program at the Idaho National Engineering and Environmental Laboratory (INEEL). ESRA provides key science and technology to meet the cleanup mission of the U.S. Department of Energy Office of Environmental Management (EM), and performs research and development that will help solve current legacy problems and enhance the INEEL’s scientific and technical capability for solving longer-term challenges. This report documents the accomplishments of the ESRC Program. The ESRC Program consisted of 25 tasks subdivided within four research areas.

Miller, David Lynn; Piet, Steven James

2001-03-01T23:59:59.000Z

175

Joint evaluation report on Integrated Engineering Information Systems (IEIS) p.1 March 16, 1999  

E-Print Network (OSTI)

, and manage information systems in view of the rapid introduction of innovations based on informationJoint evaluation report on Integrated Engineering Information Systems (IEIS) p.1 Stockholm March 16, 1999 Joint evaluation report on INTEGRATED ENGINEERING INFORMATION SYSTEMS (IEIS

Risch, Tore

176

Contractor-specific Documentation & Information in PARS II |...  

Energy Savers (EERE)

Contractor-specific Documentation & Information in PARS II Contractor-specific Documentation & Information in PARS II DOE Office of Acquisition and Project Management established...

177

Preliminary Systems Design Study assessment report. Volume 8, Appendixes  

SciTech Connect

The System Design Study (SDS), part of the Waste Technology Development Department at the Idaho National Engineering Laboratory (INEL), examined techniques available for the remediation of hazardous and transuranic waste stored at the Radioactive Waste Management Complex`s Subsurface Disposal Area at the INEL. Using specific technologies, system concepts for treating the buried waste and the surrounding contaminated soil were evaluated. Evaluation included implementability, effectiveness, and cost. The SDS resulted in the development of technology requirements including demonstration, testing, and evaluation activities needed for implementing each concept. This volume of the Systems Design Study contain four Appendixes that were part of the study. Appendix A is an EG&G Idaho, Inc., report that represents a review and compilation of previous reports describing the wastes and quantities disposed in the Subsurface Disposal Area of the Idaho National Engineering Laboratory. Appendix B contains the process flowsheets considered in this study, but not selected for detailed analysis. Appendix C is a historical tabulation of radioactive waste incinerators. Appendix D lists Department of Energy facilities where cementation stabilization systems have been used.

Mayberry, J.L.; Feizollahi, F.; Del Signore, J.C.

1992-01-01T23:59:59.000Z

178

Microsoft Word - PARS II User Guide V1.0.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 10, 2010 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net Project Assessment and Reporting System U U s s e e r r G G u u i i d d e e This page left blank intentionally. Title Page Document Name: PARS II User Guide V1.0 Publication Date: May 10, 2010 Contract Number: AM01-06IM00054 Project Number: 1ME07 CLIN 2 Written by: Jo Peck, EES Reviewed by: Ken Henderson, EES Steve Ducharme, PMC Judith Bernsen, PMC Approval: John Makepeace, OECM MA-50 This page left blank intentionally. Change Control Page Current Version # Date of Revision Section & Title Page Numbers Summary of Changes Author V1.0 5/10/2010 All All Changes from Peer Review, including

179

DOE Publishes New CALiPER Report on Subjective Evaluation of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CALiPER Report on Subjective Evaluation of LED PAR38 Lamps DOE Publishes New CALiPER Report on Subjective Evaluation of LED PAR38 Lamps November 7, 2013 - 12:00am Addthis DOE has...

180

MARKET-BASED ADVANCED COAL POWER SYSTEMS FINAL REPORT  

NLE Websites -- All DOE Office Websites (Extended Search)

MARKET-BASED ADVANCED MARKET-BASED ADVANCED COAL POWER SYSTEMS FINAL REPORT MAY 1999 DOE/FE-0400 U.S. Department of Energy Office of Fossil Energy Washington, DC 20585 Market-Based Advanced Coal Power Systems 1-1 December 1998 1. INTRODUCTION As deregulation unfolds and privatization of the utility market takes shape, priorities for power plant economics have shifted toward those of a "bottom-line" business and away from a regulated industry. Competition in utility generation and the exposure risks of large capital investments have led to a preference to minimize capital costs and fixed and variable operation and maintenance costs. With global competition from independent power producers (IPPs), non- utility generators, and utilities, the present trend of investments is with conventional pulverized

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOE technology information management system database study report  

SciTech Connect

To support the missions of the US Department of Energy (DOE) Special Technologies Program, Argonne National Laboratory is defining the requirements for an automated software system that will search electronic databases on technology. This report examines the work done and results to date. Argonne studied existing commercial and government sources of technology databases in five general areas: on-line services, patent database sources, government sources, aerospace technology sources, and general technology sources. First, it conducted a preliminary investigation of these sources to obtain information on the content, cost, frequency of updates, and other aspects of their databases. The Laboratory then performed detailed examinations of at least one source in each area. On this basis, Argonne recommended which databases should be incorporated in DOE`s Technology Information Management System.

Widing, M.A.; Blodgett, D.W.; Braun, M.D.; Jusko, M.J.; Keisler, J.M.; Love, R.J.; Robinson, G.L. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.

1994-11-01T23:59:59.000Z

182

Microsoft Word - PARS II CPP Upload Requirements.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U U C (C Pro U.S. D Contrac CPP) U oject A S Phon Depart ctor Pr Upload Assessm System Vers Ap Su Energy E 20440 Cent German ne 301-916- ww tment roject P d Requ ment a m (PAR sion 1.4 Dr pril 9, 2010 ubmitted by nterprise So tury Blvd. S ntown, MD -0050 Fax ww.eesllc.ne t of En Perform uireme and Re RS II) raft 0 : olutions Suite 150 20874 301-916-00 et nergy mance ents for eportin 66 y e r ng ii Title Page Document Name: Contractor Project Performance (CPP) Upload Requirements for PARS II, V1.4 Publication Date: April 9, 2010 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Steven Ducharme, PMC, LLC Lenore Morrison, PMC, LLC Judith Bernsen, PMC, LLC Edited by: Dennis Stoner, EES, LLC Reviewed by: Mark Landry, Dekker, LTD

183

Environmental Systems Research and Analysis FY 2000 Annual Report  

SciTech Connect

The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the INEEL. Strengthening the Technical capabilities of the INEEL will provide the technical base to serve effectively as the Environmental Management Laboratory for the Office of Environmental Management (EM). This is a progress report for the third year of the ESR Program (FY 2000). A report of activities is presented for the five ESR research investment areas: (1) Transport Aspects of Selective Mass Transport Agents, (2) Chemistry of Environmental Surfaces, (3) Materials Dynamics, (4) Characterization Science, and (5) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, the report describes activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas. The five research areas are subdivided into 18 research projects. FY 2000 research in these 18 projects has resulted in more than 50 technical papers that are in print, in press, in review, or in preparation. Additionally, more than 100 presentations were made at professional society meetings nationally and internationally. Work supported by this program was in part responsible for one of our researchers, Dr. Mason Harrup, receiving the Department of Energy’s “Bright Light” and “Energy at 23” awards. Significant accomplishments were achieved. Non-Destructive Assay hardware and software was deployed at the INEEL, enhancing the quality and efficiency of TRU waste characterization for shipment. The advanced tensiometer has been employed at numerous sites around the complex to determine hydrologic gradients in variably saturated vadose zones. An ion trap, secondary ion mass spectrometer (IT-SIMS) was designed and fabricated to deploy at the INEEL site to measure the chemical speciation of radionuclides and toxic metals on the surfaces of environmentally significant minerals. The FY 2001 program will have a significantly different structure and research content. This report presents the final summary of projects coming to an end in FY 2000 and is a bridge to the FY 2001 program.

David L. Miller; Castle, Peter Myer; Steven J. Piet

2001-01-01T23:59:59.000Z

184

PAR solar radiation | OpenEI  

Open Energy Info (EERE)

PAR solar radiation PAR solar radiation Dataset Summary Description (Abstract): Mean values of PAR Solar Radiation in kWh/m2/day for 40km cells for 1 year (month, season, year) based on data from 1995 to 2005 (Purpose): To provide a set of consistent, reliable, verifiable, and accessible global data sets for international and in-country investors and other stakeholders Source INPE (National Institute for Spatial Research) and LABSOLAR (Laboratory of Solar Energy/Federal University of Santa Catarina) - Brazil Date Released August 05th, 2009 (5 years ago) Date Updated August 05th, 2009 (5 years ago) Keywords INPE LABSOLAR PAR solar radiation renewable energy South America SWERA UNEP Data application/zip icon Download Shapefile (zip, 977.7 KiB) text/csv icon Download Data (csv, 1.8 MiB)

185

PARS II User Account Access Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Management Office of Management Office of Engineering and Construction Management User Account Access Guide for PARS II Version 1.5 June 25, 2011 Submitted by: Energy Enterprise Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net June 25, 2011 (V1.5) PARS II User Account Access Guide ii This page intentionally left blank. June 25, 2011 (V1.5) PARS II User Account Access Guide iii Title Page Document Name: User Account Access Guide for PARS II Version Number: V1.5 Publication Date: June 25, 2011 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07 CLIN 4 Prepared by: Scott Burns, Energy Enterprise Solutions, LLC Reviewed by: Judith Bernsen, Energy Enterprise Solutions, LLC

186

PARS II - Integrated Project Team Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John Makepeace (OECM) Kai Mong (EES), Ken Henderson (EES), Norm Ayers (EES) October 29, 2009 2 2 Agenda * PARS II OA & CPP Software * PARS II Deployment Timeline * Deployment Overview * Organizational Roles & Responsibilities * Project List and Schedule * Next Steps 3 PARS II OA & CPP Software * Oversight & Assessment (OA) * Web interface collects summary-level project data: status assessments, forecasts, PB, KPPs * Used by FPD, Program and OECM each month * Contractor Project Performance (CPP) * Web interface for uploading contractor's project files: earned value, schedule, variance, MR, risk * Used by contractor each month 4 PARS II Deployment Timeline 4 11/1/2009 12/1/2009 1/1/2010 2/1/2010 3/1/2010 4/1/2010 5/1/2010 6/1/2010 7/1/2010 8/1/2010 9/1/2010 10/1/2010 11/1/2010

187

ANALYSE AUTOMATIQUE PAR MINICALCULATEUR DES CONTRACTIONS  

E-Print Network (OSTI)

motricity, Diet, Reticular motricity, Ruminants, Electromyogram. INTRODUCTION Chez les ruminants, dont l motrice débute par la contrac- tion rapide (3 à 7 s) du réseau : biphasique chez l'animal au repos ou

Paris-Sud XI, Université de

188

Collge doctoral Nattribu par la bibliothque  

E-Print Network (OSTI)

..............6 Figure I. 3 : La force motrice est l'Ă©cart par rapport Ă  l.........................................17 Figure I. 8 : Variation du temps d'induction en fonction de la force motrice

Paris-Sud XI, Université de

189

PARS II User Guide | Department of Energy  

Office of Environmental Management (EM)

to assist DOE end-users in performing their respective functions within the PARS II web application. The document provides a description and "How To" for the major functions...

190

Commercial thermal distribution systems, Final report for CIEE/CEC  

SciTech Connect

According to the California Energy Commission (CEC 1998a), California commercial buildings account for 35% of statewide electricity consumption, and 16% of statewide gas consumption. Space conditioning accounts for roughly 16,000 GWh of electricity and 800 million therms of natural gas annually, and the vast majority of this space conditioning energy passes through thermal distribution systems in these buildings. In addition, 8600 GWh per year is consumed by fans and pumps in commercial buildings, most of which is used to move the thermal energy through these systems. Research work at Lawrence Berkeley National Laboratory (LBNL) has been ongoing over the past five years to investigate the energy efficiency of these thermal distribution systems, and to explore possibilities for improving that energy efficiency. Based upon that work, annual savings estimates of 1 kWh/ft{sup 2} for light commercial buildings, and 1-2 kWh/ft{sup 2} in large commercial buildings have been developed for the particular aspects of thermal distribution system performance being addressed by this project. Those savings estimates, combined with a distribution of the building stock based upon an extensive stock characterization study (Modera et al. 1999a), and technical penetration estimates, translate into statewide saving potentials of 2000 GWh/year and 75 million thermal/year, as well as an electricity peak reduction potential of 0.7 GW. The overall goal of this research program is to provide new technology and application knowledge that will allow the design, construction, and energy services industries to reduce the energy waste associated with thermal distribution systems in California commercial buildings. The specific goals of the LBNL efforts over the past year were: (1) to advance the state of knowledge about system performance and energy losses in commercial-building thermal distribution systems; (2) to evaluate the potential of reducing thermal losses through duct sealing, duct insulation, and improved equipment sizing; and (3) to develop and evaluate innovative techniques applicable to large buildings for sealing ducts and encapsulating internal duct insulation. In the UCB fan project, the goals were: (1) to develop a protocol for testing, analyzing and diagnosing problems in large commercial building built-up air handling systems, and (2) to develop low-cost measurement techniques to improve short term monitoring practices. To meet our stated goals and objectives, this project: (1) continued to investigate and characterize the performance of thermal distribution systems in commercial buildings; (2) performed energy analyses and evaluation for duct-performance improvements for both small and large commercial buildings; (3) developed aerosol injection technologies for both duct sealing and liner encapsulation in commercial buildings; and (4) designed energy-related diagnostic protocols based on short term measurement and used a benchmarking database to compare subject systems with other measured systems for certain performance metrics. This year's efforts consisted of the following distinct tasks: performing characterization measurements for five light commercial building systems and five large-commercial-building systems; analyzing the potential for including duct performance in California's Energy Efficiency Standards for Residential and Non-Residential Buildings (Title 24), including performing energy and equipment sizing analyses of air distribution systems using DOE 2.1E for non-residential buildings; conducting laboratory experiments, field experiments, and modeling of new aerosol injection technologies concepts for sealing and coating, including field testing aerosol-based sealing in two large commercial buildings; improving low-cost fan monitoring techniques measurements, and disseminating fan tools by working with energy practitioners directly where possible and publishing the results of this research and the tools developed on a web-site. The final report consists of five sections listed below. Each section includes its related

Xu, Tengfang; Bechu, Olivier; Carrie, Remi; Dickerhoff, Darryl; Fisk, William; Franconi, Ellen; Kristiansen, Oyvind; Levinson, Ronnen; McWilliams, Jennifer; Wang, Duo; Modera, Mark; Webster, Tom; Ring, Erik; Zhang, Qiang; Huizenga, Charlie; Bauman, Fred; Arens, Ed

1999-12-01T23:59:59.000Z

191

PARSII - New Reports and Reports With New Reporting Folder Location  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARSII - New Reports and Reports With New Reporting Folder Location PARSII - New Reports and Reports With New Reporting Folder Location Page 1 of 3 as of 1/24/2011 Report Name Previous Location New Location Brief Description Multi-Project or Single Project Report 2A Project Summary by Program PARS Reports Monthly Reports All active projects listing Pre/Post CD-2 $ and #'s including RYG status. Multi-Project 3A Red-Yellow Project Status Report PARS Reports Monthly Reports For every project that has been assessed by the OECM Analyst as being either Red or Yellow a worksheet is created that includes the OECM Analyst's written assessment of the project. The FPD, Site and Contractor with its EVM Certification Status are listed in the report. All appropriate EVM metrics, TPC values and CD approved dates as of the current OA Status Date are a part of the report.

192

Acoustic Resonance Spectroscopy (ARS) Munition Classification System enhancements. Final report  

SciTech Connect

Acoustic Resonance Spectroscopy (ARS) is a non-destructive evaluation technology developed at the Los Alamos National Laboratory (LANL). This technology has resulted in three generations of instrumentation, funded by the Defense Special Weapons Agency (DSWA), specifically designed for field identification of chemical weapon (CW) munitions. Each generation of ARS instrumentation was developed with a specific user in mind. The ARS1OO was built for use by the U.N. Inspection Teams going into Iraq immediately after the Persian Gulf War. The ARS200 was built for use in the US-Russia Bilateral Chemical Weapons Treaty (the primary users for this system are the US Onsite Inspection Agency (OSIA) and their Russian counterparts). The ARS300 was built with the requirements of the Organization for the Prohibition of Chemical Weapons (OPCW) in mind. Each successive system is an improved version of the previous system based on learning the weaknesses of each and, coincidentally, on the fact that more time was available to do a requirements analysis and the necessary engineering development. The ARS300 is at a level of development that warrants transferring the technology to a commercial vendor. Since LANL will supply the computer software to the selected vendor, it is possible for LANL to continue to improve the decision algorithms, add features where necessary, and adjust the user interface before the final transfer occurs. This paper describes the current system, ARS system enhancements, and software enhancements. Appendices contain the Operations Manual (software Version 3.01), and two earlier reports on enhancements.

Vela, O.A.; Huggard, J.C.

1997-09-18T23:59:59.000Z

193

Research for electric energy systems -- an annual report  

SciTech Connect

This report documents the technical progress in the two investigations which make up the project {open_quotes}Support of Research Projects for Electrical Energy Systems,{close_quotes} Department of Energy Task Order Number 137, funded by the US Department of Energy and performed by the Electricity Division of the National Institute of Standards and Technology (NIST). The first investigation is concerned with the measurement of magnetic fields in support of epidemiogical and in vitro studies of biological field effects. During 1992, the derivation of equations which predict differences between the average magnetic flux density using circular coil probes and the flux density at the center of the probe, assuming a dipole magnetic field, were completed. The information gained using these equations allows the determination of measurement uncertainty due to probe size when magnetic fields from many electrical appliances are characterized. Consultations with various state and federal organizations and the development of standards related to electric and magnetic field measurements continued. The second investigation is concerned with two different activities related to compressed-gas insulated high voltage systems: (1) the measurement of dissociative electron attachment cross sections and negative ion production in S{sub 2}F{sub 10}, S{sub 2}OF{sub 10}, and S{sub 2}O{sub 2}F{sub 10}, and (2) Monte-Carlo simulations of ac-generated partial-discharge pulses that can occur in SF{sub 6}-insulated power systems and can be sources of gas decomposition.

Anderson, W.E. [ed.

1993-10-01T23:59:59.000Z

194

Urban Integrated Industrial Cogeneration Systems Analysis. Phase II final report  

SciTech Connect

Through the Urban Integrated Industrial Cogeneration Systems Analysis (UIICSA), the City of Chicago embarked upon an ambitious effort to identify the measure the overall industrial cogeneration market in the city and to evaluate in detail the most promising market opportunities. This report discusses the background of the work completed during Phase II of the UIICSA and presents the results of economic feasibility studies conducted for three potential cogeneration sites in Chicago. Phase II focused on the feasibility of cogeneration at the three most promising sites: the Stockyards and Calumet industrial areas, and the Ford City commercial/industrial complex. Each feasibility case study considered the energy load requirements of the existing facilities at the site and the potential for attracting and serving new growth in the area. Alternative fuels and technologies, and ownership and financing options were also incorporated into the case studies. Finally, site specific considerations such as development incentives, zoning and building code restrictions and environmental requirements were investigated.

Not Available

1984-01-01T23:59:59.000Z

195

Fuel Cell Systems Annual Progress Report | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Progress Report Fuel Cells For Transportation - 1999 Annual Progress Report Energy Conversion Team Fuel Cells for Transportation - Research and Development: Program Abstracts...

196

Better Buildings Neighborhood Program Reporting and Information System  

Energy.gov (U.S. Department of Energy (DOE))

This page includes the latest guidance, resources, and links to assist partners with reporting. Information includes:

197

Pentek concrete scabbling system: Baseline report; Greenbook (chapter)  

SciTech Connect

The Pentek scabbling technology was tested at Florida International University (FIU) and is being evaluated as a baseline technology. This report evaluates it for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek concrete scabbling system consisted of the MOOSE, SQUIRREL-I, and SQUIRREL-III scabblers. The scabblers are designed to scarify concrete floors and slabs using cross-section, tungsten carbide tipped bits. The bits are designed to remove concrete in 318 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation conducted during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each of these exposures is recommended. Because of the outdoor environment where the testing demonstration took place, results may be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed operating environment. Other areas of concern were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

NONE

1997-07-31T23:59:59.000Z

198

Pentek metal coating removal system: Baseline report; Greenbook (chapter)  

SciTech Connect

The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

NONE

1997-07-31T23:59:59.000Z

199

SOLERAS - Solar Energy Water Desalination Project: Catalytic. System design final report. Volume 1. System requirement definition and system analysis  

SciTech Connect

Catalytic Inc. was awarded a contract to conduct a preliminary system design and cost analysis for a brackish water desalination project to be located in Brownsville, Texas. System analyses and economic analyses were performed to define the baseline solar energy desalination system. The baseline system provides an average daily product water capacity of 6000 mT. The baseline system is optimal relative to technological risk, performance, and product water cost. Subsystems and their interfaces have been defined and product water cost projections made for commercial plants in a range of capacities. Science Applications, Inc. (SAI), subcontractor to Catalytic, had responsibility for the solar power system. This, the final report, summarizes the work performed under the Phase I effort.

Not Available

1986-01-01T23:59:59.000Z

200

[Advanced Gas Turbine Systems Research]. Technical Quarterly Progress Report  

SciTech Connect

Major Accomplishments by Advanced Gas Turbine Systems Research (AGTSR) during this reporting period are highlighted below and amplified in later sections of this report: AGTSR distributed 50 proposals from the 98RFP to the IRB for review, evaluation and rank-ordering during the summer; AGTSR conducted a detailed program review at DOE-FETC on July 24; AGTSR organized the 1998 IRB proposal review meeting at SCIES on September 15-16; AGTSR consolidated all the IRB proposal scores and rank-orderings to facilitate the 98RFP proposal deliberations; AGTSR submitted meeting minutes and proposal short-list recommendation to the IRB and DOE for the 98RFP solicitation; AGTSR reviewed two gas turbine related proposals as part of the CU RFP State Project for renovating the central energy facility; AGTSR reviewed and cleared research papers with the IRB from the University of Pittsburgh, Wisconsin, and Minnesota; AGTSR assisted GTA in obtaining university stakeholder support of the ATS program from California, Pennsylvania, and Colorado; AGTSR assisted GTA in distributing alert notices on potential ATS budget cuts to over 150 AGTSR performing university members; AGTSR submitted proceedings booklet and organizational information pertaining to the OAI hybrid gas turbine workshop to DOE-FETC; For DOE-FETC, AGTSR updated the university consortium poster to include new members and research highlights; For DOE-FETC, the general AGTSR Fact Sheet was updated to include new awards, workshops, educational activity and select accomplishments from the research projects; For DOE-FETC, AGTSR prepared three fact sheets highlighting university research supported in combustion, aero-heat transfer, and materials; For DOE-FETC, AGTSR submitted pictures on materials research for inclusion in the ATS technology brochure; For DOE-FETC, AGTSR submitted a post-2000 roadmap showing potential technology paths AGTSR could pursue in the next decade; AGTSR distributed the ninth newsletter UPDATE to DOE, the IRB: and two interested partners involved in ATS; AGTSR submitted information on its RFP's, workshops, and educational activities for the 1999 ASMWIGTI technology report for worldwide distribution; AGTSR coordinated university poster session titles and format with Conference Management Associates (CMA) for the 98 ATS Annual; and AGTSR submitted 2-page abstract to CMA for the 98 ATS Review titled: ''AGTSR: A Virtual National Lab''.

NONE

1998-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CMR Shuffler System: Passive Mode Calibration and Certification Report  

SciTech Connect

Los Alamos National Laboratory has a number of spherical confinement vessels (CVs) remaining from tests involving nuclear materials. These vessels have an inner diameter of 6 feet with 1 to 2 inch thick steel walls. The goal of the Confinement Vessel Disposition (CVD) project is to remove debris and reduce contamination inside the vessels. As debris is removed from the vessels, material will be placed in waste drums. Far-field gamma ray assay will be used to determine when a drum is nearing a {sup 239}Pu equivalent mass of less than 200 g. The drum will then be assayed using a waste drum shuffler operated in passive mode using a neutron coincidence counting method for accountability. This report focuses on the testing and calibration of the CMR waste drum shuffler in passive mode operation. Initial testing was performed to confirm previously accepted measurement parameters. The system was then calibrated using a set of weapons grade Pu (WGPu, {sup 239}Pu > 93%) oxide standards placed inside a 55 gallon drum. The calibration data ranges from Pu mass of 0.5 g to 188.9 g. The CMR waste drum shuffler has been tested and calibrated in passive mode in preparation for safeguards accountability measurements of waste drums containing material removed from CVs for the CVD project.

Frame, Katherine C. [Los Alamos National Laboratory; Gomez, Cipriano D. [Retired CMR-OPS: OPERATIONS; Salazar, William R. [Los Alamos National Laboratory; Mayo, Douglas R. [Los Alamos National Laboratory; Vigil, Georgiana M. [Los Alamos National Laboratory; Crooks, William J. [Los Alamos National Laboratory; Stange, Sy [Los Alamos National Laboratory

2012-07-20T23:59:59.000Z

202

Expert systems for flow cytometry data analysis: A preliminary report  

SciTech Connect

Flow Cytometry has become an accepted technique in the clinical laboratory for rapid immunophenotyping of patient blood samples. Multiple, fluorescent labeled monoclonal antibodies are used to tag the cells, which are then analyzed one at a time at rates of several thousand cells a second. Patient samples are processed through the flow cytometer at more than one a minute. Clinicians are being overwhelmed by the large amount of data that must be analyzed to provide the information needed to assist in disease diagnosis. An expert system is being developed to assist clinicians in analyzing this multivariate flow cytometry data. The data from each sample are processed by a clustering algorithm, which finds the means of the distinct cell subpopulations in a sample. These mean values of fluorescence are translated into words such as negative,'' dim'' and bright'' and the words are combined into patterns that are matched against the premises on the left hand side of the rules used to identify the disease categories. This is a report of work in progress. 13 refs., 4 figs.

Salzman, G.C. (Los Alamos National Lab., NM (USA)); Stewart, C.C. (Roswell Park Memorial Inst., Buffalo, NY (USA). Lab. of Flow Cytometry); Duque, R.E. (Norwood Clinic, Birmingham, AL (USA))

1990-01-01T23:59:59.000Z

203

FY 2009 Summary Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Performance and financial information FY 2009 DOE/CF-0045 The Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports in order to provide performance, financial and related information in a more meaningful and useful format. In accordance with the Act, the Department of Energy (Department or DOE), has produced a consolidated Performance and Accountability Report (PAR) in previous years. For fiscal year (FY) 2009, the Department has chosen to produce an alternative report to the consolidated PAR and will produce an Agency Financial Report, an Annual Performance Report and a Summary of Performance and Financial

204

Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs—Summary Report  

SciTech Connect

This document is a summarization of the report, Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs, the final report for phase 2 of the SPSP (DOE workforce study) project.

O'Neil, Lori Ross; Assante, Michael; Tobey, D. H.; Conway, T. J.; Vanderhorst, Jr, T. J.; Januszewski, III, J.; Leo, R.; Perman, K.

2013-07-01T23:59:59.000Z

205

Research and Development Strategies for Compressed & Cryo-Hydrogen Storage Systems- Workshop Summary Report  

Energy.gov (U.S. Department of Energy (DOE))

Summary report from the Compressed and Cryo-Hydrogen Storage Systems Workshops held February 14-15, 2011, in Crystal City, Virginia. Report summarizes the discussions that took place in the breakout sessions and describes major findings of the workshops.

206

Columbia River Hatchery Reform System-Wide Report.  

SciTech Connect

The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations for Puget Sound/Coastal Washington hatchery programs, followed by the development in 2005 of a suite of analytical tools to support application of the principles (all reports and tools are available at www.hatcheryreform.us). In 2005, Congress directed the National Oceanic and Atmospheric Administration-Fisheries (NOAA Fisheries) to replicate the Puget Sound and Coastal Washington Hatchery Reform Project in the Columbia River Basin. The HSRG was expanded to 14 members to include individuals with specific knowledge about the Columbia River salmon and steelhead populations. This second phase was initially envisioned as a one-year review, with emphasis on the Lower Columbia River hatchery programs. It became clear however, that the Columbia River Basin needed to be viewed as an inter-connected ecosystem in order for the review to be useful. The project scope was subsequently expanded to include the entire Basin, with funding for a second year provided by the Bonneville Power Administration (BPA) under the auspices of the Northwest Power and Conservation Council's (NPCC) Fish and Wildlife Program. The objective of the HSRG's Columbia River Basin review was to change the focus of the Columbia River hatchery system. In the past, these hatchery programs have been aimed at supplying adequate numbers of fish for harvest as mitigation primarily for hydropower development in the Basin. A new, ecosystem-based approach is founded on the idea that harvest goals are sustainable only if they are compatible with conservation goals. The challenge before the HSRG was to determine whether or not conservation and harvest goals could be met by fishery managers and, if so, how. The HSRG determined that in order to address these twin goals, both hatchery and harvest reforms are necessary. The HSRG approach represents an important change of direction in managing hatcheries in the region. It provides a clear demonstration that current hatchery programs can indeed be redirected to better meet both conservation and harvest goals. For each Columbia River Basin Environmentally Significant Unit

Warren, Dan [Hatchery Scientific Review Group

2009-04-16T23:59:59.000Z

207

2-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network (OSTI)

2-1 2001 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 2001 SITE ENVIRONMENTAL REPORT Environmental Management System B R O O K H A V E N N A T I O N A L L A B O R A T O R Y's Environmental Management System has an emphasis on compliance assurance, pollution prevention, and community

Homes, Christopher C.

208

2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network (OSTI)

2-1 SITE ENVIRONMENTAL REPORT 2000 CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM SITE ENVIRONMENTAL REPORT 2000 Environmental Management System B R O O K H A V E N N A T I O N A L L A B O R A T O R Y Chapter 2 In 2000, BNL continued to implement and enhance its Environmental Management System to ensure

Homes, Christopher C.

209

APS Alternative Fuel (Hydrogen) Pilot Plant - Monitoring System Report  

SciTech Connect

The U.S. Department of Energy’s (DOE’s) Advanced Vehicle Testing Activity (AVTA), along with Electric Transportation Applications and Arizona Pubic Service (APS), is monitoring the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant to determine the costs to produce hydrogen fuels (including 100% hydrogen as well as hydrogen and compressed natural gas blends) for use by fleets and other operators of advanced-technology vehicles. The hydrogen fuel cost data will be used as benchmark data by technology modelers as well as research and development programs. The Pilot Plant can produce up to 18 kilograms (kg) of hydrogen per day by electrolysis. It can store up to 155 kg of hydrogen at various pressures up to 6,000 psi. The dispenser island can fuel vehicles with 100% hydrogen at 5,000 psi and with blends of hydrogen and compressed natural gas at 3,600 psi. The monitoring system was designed to track hydrogen delivery to each of the three storage areas and to monitor the use of electricity on all major equipment in the Pilot Plant, including the fuel dispenser island. In addition, water used for the electrolysis process is monitored to allow calculation of the total cost of plant operations and plant efficiencies. The monitoring system at the Pilot Plant will include about 100 sensors when complete (50 are installed to date), allowing for analysis of component, subsystems, and plant-level costs. The monitoring software is mostly off-the-shelve, with a custom interface. The majority of the sensors input to the Programmable Automation Controller as 4- to 20-mA analog signals. The plant can be monitored over of the Internet, but the control functions are restricted to the control room equipment. Using the APS general service plan E32 electric rate of 2.105 cents per kWh, during a recent eight-month period when 1,200 kg of hydrogen was produced and the plant capacity factor was 26%, the electricity cost to produce one kg of hydrogen was $3.43. However, the plant capacity factor has been increasing, with a recent one-month high of 49%. If a plant capacity factor of 70% can be achieved with the present equipment, the cost of electricity would drop to $2.39 per kg of hydrogen. In this report, the power conversion (76.7%), cell stack (53.1%), and reverse osmosis system (7.14%) efficiencies are also calculated, as is the water cost per kg of hydrogen produced ($0.10 per kg). The monitoring system has identified several areas having the potential to lower costs, including using an reverse osmosis system with a higher efficiency, improving the electrolysis power conversion efficiency, and using air cooling to replace some or all chiller cooling. These activities are managed by the Idaho National Laboratory for the AVTA, which is part of DOE’s FreedomCAR and Vehicle Technologies Program.

James Francfort; Dimitri Hochard

2005-07-01T23:59:59.000Z

210

Commercial thermal distribution systems, Final report for CIEE/CEC  

E-Print Network (OSTI)

air-volume HVAC systems, static pressures across theIn VAY HVAC systems, the static pressures may likely changefor the Static Pressure Analysis Tool are: • HVAC schedule

Xu, T.

2011-01-01T23:59:59.000Z

211

"Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Supervisory Control and Data Acquisition (SCADA) Systems." The CIP "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 Featured in this month's issue of The CIP Report are Supervisory Control and Data Acquisition (SCADA) systems. SCADA systems monitor and control the processes of many of our Nation's infrastructures. The security and safety of transportation, water, communications, and many other vital parts of our everyday lives all rely on SCADA systems. In this issue we look at some of the different SCADA systems and their applications. The CIP Report More Documents & Publications The CIP Report, Vol.11, No. 2 (August 2012): Smart Grid Security Introduction SCADA Security for Managers and Operators

212

Advanced thermal barrier coating system development. Technical progress report, June 1, 1996--July 31, 1996  

SciTech Connect

An improved thermal barrier coating system with good reliability and thermal performance is described. The report discusses the coating process, manufacturing, repair, deposition, and microstructure of the coatings.

NONE

1996-08-07T23:59:59.000Z

213

SLECTEURS D'AMPLITUDE Par R. WAHL.  

E-Print Network (OSTI)

67 A. S�LECTEURS D'AMPLITUDE Par R. WAHL. Commissariat à l'�nergie atomique. Laboratoires du Fort maximum Amax (fig. 1). - On appelle discriminafeur d'amplitude un appareil Fig. 1.. . qui transmet toute contre, un sélecteur d'amplitude,ne transmet que les impulsions dont l'amplitude Amax est comprise entre

Paris-Sud XI, Université de

214

pr esent ee par Pascal Brand  

E-Print Network (OSTI)

TH#12;ESE pr esent ee par Pascal Brand pour obtenir le grade de Docteur de l'Universit e Claude Giraudon Examinateurs: M. Serge Castan M. Roger Mohr Th#12;ese pr epar ee au sein du laboratoire Lifia Imag de coins dans l'image : : : : : : : : : : : : : : : : : : : 31 2.1.3 Extraction de cibles circulaires

Paris-Sud XI, Université de

215

L'ABSORPTION DES ULTRASONS PAR CERTAINES CTONES Par S. PARTHASARATHY et V. NARASIMHAN,  

E-Print Network (OSTI)

957. L'ABSORPTION DES ULTRASONS PAR CERTAINES C�TONES Par S. PARTHASARATHY et V. NARASIMHAN coefficient d'absorption ont été mesurés dans plusieurs cétones à différentes températures et les résultats variation de l'absorption avec la température était positif dans l'intervalle considéré dans ce travail

Paris-Sud XI, Université de

216

System Integration of Distributed Power for Complete Building Systems: Phase 1 Report  

SciTech Connect

This report describes NiSource Energy Technologies Inc.'s base year of a planned 3-year effort to advance distributed power development, deployment, and integration. Its long-term goal is to design ways to extend distributed generation into the physical design and controls of buildings. NET worked to meet this goal through advances in the implementation and control of CHP systems in end-user environments and a further understanding of electric interconnection and siting issues. Important results from the first year were a survey of the state of the art of interconnection issues associated with distributed generation, a survey of the local zoning requirements for the NiSource service territory, and the acquisition of data about the operation, reliability, interconnection, and performance of CHP systems and components of two test sites.

Kramer, R.

2003-12-01T23:59:59.000Z

217

Microsoft Word - DEC1387487110504 Dekker Reports Document DRAFT _GW,IP_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guide, V 0.02 Guide, V 0.02 Tuesday, May 3, 2011 U.S. Department of Energy Project Assessment and Reporting System Reports Guide Version 0.02 This booklet describes each report in PARS II, including those created specifically for the DOE, and those that come standard with the Dekker PMIS(tm) software package. Each report description is followed by an image or images of the report. 2 Table of Contents - Folders I. Cost Performance ......................................................................................................................................................... 14 A. Cost Performance Reports - (CPR) ....................................................................................................................... 15

218

Advanced thermal barrier coating system development. Technical progress report, April 1, 1996--May 31, 1996  

SciTech Connect

Objectives of this program are to provide an improved thermal barrier system with increased temperature capability and reliability relative to current systems. This report describes the bond coat development and deposition, manufacturing, and repair.

NONE

1996-06-10T23:59:59.000Z

219

Advanced thermal barrier coating system development. Technical progress report, January 1, 1996--March 31, 1996  

SciTech Connect

Objectives of this program are to provide a thermal barrier coating system with increased temperature capability and improved reliability relative to current state of the art systems. This report describes the bond coat deposition process, manufacturing, and repair.

NONE

1996-04-08T23:59:59.000Z

220

Vehicle Technologies Office: 2010 Vehicle and Systems Simulation and Testing R&D Annual Progress Report  

Energy.gov (U.S. Department of Energy (DOE))

2010 annual report focusing on five main areas: modeling and simulation, component and systems evaluation, laboratory and field vehicle evaluation, codes and standards development, and heavy vehicle systems optimization.

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Vehicle Technologies Office: 2013 Vehicle and Systems Simulation and Testing R&D Annual Progress Report  

Energy.gov (U.S. Department of Energy (DOE))

FY 2013 annual report focuses on the following areas: vehicle modeling and simulation, component and systems evaluations, laboratory and field evaluations, codes and standards, industry projects, and vehicle systems optimization.

222

Vehicle Technologies Office: 2011 Vehicle and Systems Simulation and Testing R&D Annual Progress Report  

Energy.gov (U.S. Department of Energy (DOE))

FY 2011 annual report focusing on five main areas: modeling and simulation, component and systems evaluation, laboratory and field vehicle evaluation, codes and standards development, and heavy vehicle systems optimization.

223

Vehicle Technologies Office: 2012 Vehicle and Systems Simulation and Testing R&D Annual Progress Report  

Energy.gov (U.S. Department of Energy (DOE))

FY 2012 annual report focusing on five main areas: modeling and simulation, component and systems evaluation, laboratory and field vehicle evaluation, codes and standards development, and heavy vehicle systems optimization.

224

Lower Flathead System Fisheries Study, 1984 Annual Report.  

SciTech Connect

This study was undertaken to assess the effects of Kerr Dam operations on the fisheries of the Lower Flathead System. Supported by Bonneville Power Administration funding, and conducted by the Confederated Salish and Kootenai Tribes, the study began in December of 1982 and is scheduled for completion in December of 1987. This report covers the 1983-84 field season and includes the status of target fish species populations in the Flathead River and tributaries, and initial work in South Bay of Flathead Lake. Additionally it addresses how Kerr operations may effect the reproduction of salmonids and northern pike. Combined trout population estimates for rainbow, brown, brook, and bull trout, averaged 13 fish/km of the lower Flathead River. The number of bull trout and cutthroat trout captured was so low that estimation of their individual populations was not possible. An interim closure to trout harvest on the lower Flathead River was recommended and approved by the Tribal Council until study results can be further analyzed and management options reviewed. Population estimates for northern pike ranged from six/kilometer in poorer habitat, to one hundred three/km in the best habitat in the main Flathead River. Seven pike were radio tagged and their movements monitored. Movements of over 89 km were recorded. One fish left the Flathead River and moved down the Clark Fork to the Plains area. Fish weirs were constructed on the Jocko River and Mission Creek to assess spawning runs of trout from the main river. Thirty-two adult rainbow passed the Jocko weir and twenty-eight passed the Mission weir during the spring spawning season. Twenty adult brown trout were captured at the Jocko weir and five at Mission weir in the fall. The Jocko weir suffered minor damage due to bed load movement during high flows of spring runoff. The structure of trout populations in the lower Flathead River points to spawning and recruitment problems caused by hydroelectric operations and sedimentation. Among the consequences of the present operational regime are constant, rapid changes in river discharge during spawning and Incubation seasons of trout species present in the lower river. Hamilton and Buell (1976) reported that similar fluctuation might exceed tolerance limits of adults and inhibit spawning behavior, dewater redds, strand fry, and displace juveniles to habitats less suitable for survival. Similar problems are felt to exist on the lower river. Constant fluctuations over backwater vegetation have been linked to major problems in successful northern pike spawning and recruitment by preventing access to spawning sites, and dewatering eggs and attached fry. Phase I of the South Bay investigation was completed this year resulting in a detailed study program for the next three years. Dominant habitat types were mapped, and physical habitat and biological monitoring methods were evaluated and selected. Permanent habitat transects, water quality stations, fish sampling, gillnetting, seining, and trapping sites were established.

Darling, James E.; Pajak, Paul; Wunderlich, Mary P.

1984-12-01T23:59:59.000Z

225

Annual Report: Advanced Energy Systems Fuel Cells (30 September 2013)  

SciTech Connect

The comprehensive research plan for Fuel Cells focused on Solid State Energy Conversion Alliance (SECA) programmatic targets and included objectives in two primary and focused areas: (1) investigation of degradation modes exhibited by the anode/electrolyte/cathode (AEC), development of computational models describing the associated degradation rates, and generation of a modeling tool predicting long term AEC degradation response; and (2) generation of novel electrode materials and microstructures and implementation of the improved electrode technology to enhance performance. In these areas, the National Energy Technology Laboratory (NETL) Regional University Alliance (RUA) team has completed and reported research that is significant to the SECA program, and SECA continued to engage all SECA core and SECA industry teams. Examination of degradation in an operational solid oxide fuel cell (SOFC) requires a logical organization of research effort into activities such as fundamental data gathering, tool development, theoretical framework construction, computational modeling, and experimental data collection and validation. Discrete research activity in each of these categories was completed throughout the year and documented in quarterly reports, and researchers established a framework to assemble component research activities into a single operational modeling tool. The modeling framework describes a scheme for categorizing the component processes affecting the temporal evolution of cell performance, and provides a taxonomical structure of known degradation processes. The framework is an organizational tool that can be populated by existing studies, new research completed in conjunction with SECA, or independently obtained. The Fuel Cell Team also leveraged multiple tools to create cell performance and degradation predictions that illustrate the combined utility of the discrete modeling activity. Researchers first generated 800 continuous hours of SOFC experimental data capturing operational degradation. The data were matched by a 3D multi-physics simulation of SOFC operational performance assuming that the entire performance loss related to coarsening of the cathode triple phase boundary (3PB). The predicted 3PB coarsening was then used to tune the mobility parameters of a phase field model describing microstructural evolution of the lanthanum strontium manganate (LSM)/ yttria stabilized zirconia (YSZ) system. Once calibrated, the phase field model predicted continuous microstructural coarsening processes occurring over the operating period, which could be extrapolated to performance periods of longer duration and also used to produce 3D graphical representations. NETL researchers also completed significant electrode engineering research complimented by 3D multi-physics simulations. In one key activity researchers generated an illustration demonstrating that control of infiltrate deposition can provide cell manufacturers with significant additional operational and engineering control over the SOFC stack. Specifically, researchers demonstrated that by engineering the deposition of electrocatalyst inside the cathode, the distribution of overpotential across the cell could be controlled to either decrease the average cell overpotential value or minimize cross-cell overpotential gradient. Results imply that manufacturers can establish improved engineering control over stack operation by implementing infiltration technology in SOFC cathodes.

Gerdes, Kirk; Richards, George

2014-04-16T23:59:59.000Z

226

DOE Hydrogen and Fuel Cells Program: 2010 Annual Progress Report - Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Systems Analysis Systems Analysis Printable Version 2010 Annual Progress Report VII. Systems Analysis This section of the 2010 Progress Report for the DOE Hydrogen Program focuses on systems analysis. Each technical report is available as an individual Adobe Acrobat PDF. Systems Analysis Sub-Program Overview, Fred Joseck, DOE Scenario Evaluation, Regionalization and Analysis (SERA) Model, Brian Bush, National Renewable Energy Laboratory Analysis of Energy Infrastructures and Potential Impacts from an Emergent Hydrogen Fueling Infrastructure, David Reichmuth, Sandia National Laboratories Agent-Based Model of the Transition to Hydrogen-Based Personal Transportation: Consumer Adoption and Infrastructure Development Including Combined Hydrogen, Heat, and Power, Matthew Mahalik, Argonne National

227

ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SCADA/EMS System INEEL Baseline Summary Test Report (November SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of the Critical Infrastructure Test Range Development Program, which is funded by the U.S. Department of Energy; Office of Energy Assurance (DOE/OEA). This report is a nonproprietary version of the report sent to ABB that identified specific issues related to the security vulnerabilities in the ABB SCADA/EMS system. Work was performed by specialists in the fields of control system development, networking, software engineering, and cybersecurity. This

228

Blade System Design Study. Part II, final project report (GEC).  

SciTech Connect

As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its being used in innovative prototype blades of 9-m and 30-m length, as well as other non-wind related structures.

Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

2009-05-01T23:59:59.000Z

229

Report on System operation A background report prepared by the Nordel Operation  

E-Print Network (OSTI)

.................................................................................................................... 3 2 COOPERATION AND PRINCIPLES AGREED IN SYSTEM OPERATION AGREEMENT REGARDING POWER SHORTAGE will further improve the system security. Training of operation people is continuously important to be able in System Operation Agreement regarding power shortage and disturbance situations 2.1 Purpose of the System

230

B61 System FY 2012 June Monthly Report  

SciTech Connect

These viewgraphs are to be provided to NNSA to update the status of the B61 legacy work and activities. The viewgraphs cover such issues as budget, schedule, scope, and the like. They are part of the monthly reporting process.

Wentz, Kip G. [Los Alamos National Laboratory

2012-07-09T23:59:59.000Z

231

B61 System FY 2012 May Monthly Report  

SciTech Connect

These viewgraphs are to be provided to NNSA to update the status of the B61 legacy work and activities. The viewgraphs cover such issues as budget, schedule, scope, and the like. They are part of the monthly reporting process.

Neff, Warren E [Los Alamos National Laboratory

2012-06-05T23:59:59.000Z

232

Survey Report: Improving Integration of Program Management and Systems Engineering  

E-Print Network (OSTI)

For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

Conforto, Edivandro

233

Ris Energy Report 8 The intelligent energy system infrastructure for the future  

E-Print Network (OSTI)

Risø Energy Report 8 The intelligent energy system infrastructure for the future Dansk oversættelse Sønderberg Petersen #12;Risø Energy Report 5 Renewable energy for power and transport Den globale Report 5, som sætter fokus på status og tendenser inden for vedvarende energi. Rapporten giver et

234

Operability test report for rotary mode core sampling system number 3  

SciTech Connect

This report documents the successful completion of operability testing for the Rotary Mode Core Sampling (RMCS) system {number_sign}3. The Report includes the test procedure (WHC-SD-WM-OTP-174), exception resolutions, data sheets, and a test report summary.

Corbett, J.E.

1996-03-01T23:59:59.000Z

235

[Waste water heat recovery system]. Final report, September 30, 1992  

SciTech Connect

The production capabilities for and field testing of the heat recovery system are described briefly. Drawings are included.

Not Available

1993-04-28T23:59:59.000Z

236

SOLERAS - Photovoltaic Power Systems Project. Rural solar applications. Final report: project summary  

SciTech Connect

The Saudi Solar Village Project photovoltaic system is described, consisting of 160 arrays, a computerized control system, 1100 kW of electrical storage in lead-acid batteries, and an automatic weather data gathering system. Satisfactory overall system performance is reported. Performance degradation due to dust on the array lenses was determined. Field operational problems are discussed. (LEW)

Not Available

1985-01-01T23:59:59.000Z

237

Microsoft Word - CERFDOE Final Report - 071204.doc | Department...  

Energy Savers (EERE)

Microsoft Word - CERFDOE Final Report - 071204.doc More Documents & Publications Integrated Project Team RM DOE EIR FM.doc Proposed Data Elements for PARS II Web Application...

238

Research and Development Strategies for Compressed & Cryo-Hydrogen Storage Systems - Workshop Summary Report  

NLE Websites -- All DOE Office Websites (Extended Search)

and Development and Development Strategies for Compressed & Cryo-Hydrogen Storage Systems Workshop Summary Report Prepared by: Fuel Cell Technologies Program Compressed & Cryo-Hydrogen Storage Systems Workshops February 14-15, 2011 Crystal City, Virginia Compressed and Cryo-Hydrogen Storage Systems Workshop Summary Report 2 Research and Development Strategies for Compressed & Cryo- Hydrogen Storage Systems Summary: On February 14-15, 2011, the Systems Integration group of the National Renewable Energy Laboratory, in conjunction with the Hydrogen Storage team of the EERE Fuel Cell Technologies Program, hosted two days of workshops on compressed and cryo- hydrogen storage systems in Crystal City, VA. The overarching objective was to

239

INTERIM VALIDATION REPORT MIDDLE DISTILLATE PRICE MONITORING SYSTEM  

E-Print Network (OSTI)

flow directly from the refinery to wholesaler, to retailer,of No. 2 heating oil for the refinery, wholesale and retailfirst system monitored refinery, wholesale and retail price

Hopelain, D.G.

2011-01-01T23:59:59.000Z

240

Energy Storage System Safety Reports - August 2014 and September...  

Energy Savers (EERE)

Sheet: Codes and Standards for Energy Storage System Performance and Safety (June 2014) DOE-TSPP-3-2013, Using Voluntary Consensus Standards and Interacting With Standards...

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Hydrogen Storage Systems Analysis Working Group Meeting: Summary Report  

Energy.gov (U.S. Department of Energy (DOE))

The objective of these biannual Working Group meetings is to bring together the DOE research community involved in systems analysis of hydrogen storage materials and processes.

242

Development of an automatic heliostat cleaning system. Final technical report  

SciTech Connect

An automatic washing system was designed consisting of a water treatment system, a pressurized underground water distribution system, an automatic spray washing module for each heliostat, a water collection system, and appropriate controls to operate this equipment. In order to determine the required values for the various washing parameters, a series of washing tests was undertaken in which mirrors were soiled and then cleaned by a high pressure water spray. Reflectivity was measured for the clean, soiled and washed conditions to determine the effectiveness of the cleaning. A heliostat spray module was constructed and operated mainly to obtain information on the mechanical operation of one concept. This testing showed that this system was generally satisfactory, but did show some areas for improvement. Water distribution and waste water systems were designed and evaluated with the main conclusion that conventional waste water collection is complex and the most expensive part of the system. The total system is shown to be cost effective if site meteorological conditions do not supply a large number of cycles of natural cleaning occurrences. Continued development of this concept by constructing a small scale washing system within an existing heliostat field is recommended.

Tremblay, P.; Poulin, E.

1980-12-01T23:59:59.000Z

243

PARS II Standard Operating Procedure Business Rules  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 25, 2011 June 25, 2011 U.S. Department of Energy The PARS II Standard Operating Procedure is a "living document" and will be updated on an ongoing basis. Comments or suggestions are welcome and should be forwarded to the PARS II administrator at PARSIIsupportoecm@hq.doe.gov. Notes Comment Pages Comment Pages Index Screenshot Pages Introduction I-1 Generic Business Rules I-2 Select Project I-3 - I-5 Enter/Modify Project Information I-6 - I-15 Enter/Modify Contact Information I-16 - I-21 Creating a Project I-22 Enter CD0 Information I-23 - I-26 Enter CD1 Information I-27 - I-29 Enter CD2 Information I-30 - I-33 Enter CD3A Information I-34 - I-36 Enter CD3 Information I-37 - I-39 Enter CD4 Information I-40 - I-42 Enter Closeout Information I-43 - I-45 Enter BCP Information I-46 - I-50 Screenshot

244

PARS II KNOWN ISSUES AND SUGGESTED WORKAROUNDS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KNOWN ISSUES AND SUGGESTED KNOWN ISSUES AND SUGGESTED WORKAROUNDS October 1, 2010 1 The following information identifies known issues in PARS II and suggests possible workarounds to address those issues. Upon log-in, I receive a white screen. What should I do? A fix was added to PARS II to partially mitigate the issue of users getting a blank white screen when logging in. This issue is caused by their previous session having timed out, and Internet Explorer not recognizing that the session can't be restored. Note: While the fix assists in reducing the number of instances of this happening, it does not completely eliminate the issue as there are factors outside of the application that affect it. In the event the user receives a white screen, the following workaround is

245

[Bifurcations and patterns in nonlinear dissifative systems]. Progress report  

SciTech Connect

This report discusses the following topics: Rayleigh-Benard convection with an imposed horizontal flow; Rayleigh-Benard convection in a gas under non-boussinesq conditions; electro- convection in a nematic liquid crystal; and Rayleigh-Benard convection in a nematic liquid crystal. (LSP)

Ahlers, G.; Cannell, D.S.

1992-02-26T23:59:59.000Z

246

Advanced thermal barrier coating system development: Technical progress report  

SciTech Connect

Objectives are to provide an improved TBC system with increased temperature capability and improved reliability, for the Advanced Turbine Systems program (gas turbine). The base program consists of three phases: Phase I, program planning (complete); Phase II, development; and Phase III (selected specimen-bench test). Work is currently being performed in Phase II.

NONE

1996-08-07T23:59:59.000Z

247

Mobile integrated temporary utility system. Innovative technology summary report  

SciTech Connect

The Mobile Integrated Temporary Utility System (MITUS) integrates portable electrical power along with communications and emergency alarm and lighting capabilities to provide safe, centralized power to work areas that need to be de-energized for decommissioning work. MITUS consists of a portable unit substation; up to twenty portable kiosks that house the power receptacles, communications, and emergency alarm and lighting systems; and a central communications unit. This system makes sequential decommissioning efforts efficient and cost-effective by allowing the integrated system to remain intact while being moved to subsequent work sites. Use of the MITUS also eliminates the need to conduct zero-energy tests and implement associated lock-out/tag-out procedures at partially de-energized facilities. Since the MITUS is a designed system, it can be customized to accommodate unique facility conditions simply by varying kiosks and transformer configurations. The MITUS is an attractive alternate to the use of portable generators with stand-alone communications and emergency system. It is more cost-effective than upgrading or reconfiguring existing power distribution systems.

NONE

1998-12-01T23:59:59.000Z

248

Evaluation of industrial combustion control systems. Final report  

SciTech Connect

This study evaluated O/sub 2/ and CO monitoring systems used for combustion controls to provide reliable data on their performance, operating range and accuracy. The study concentrated on three in-situ O/sub 2/ and two in-situ CO monitoring systems which are applicable to furnace and boiler controls. The project provides technical information for cost/benefit analysis of combustion control systems and to help expedite implementation of combustion control technology by industry. The evaluation of the stack gas monitoring systems was carried out for ranges of furnace operating parameters such as fuel to air mixture ratio, burner firing rate, heat extraction rate, fuel type, combustion air preheat temperature, and cyclic operating conditions, which are based on information gathered from typical operational practices of representative industrial furnaces and boilers. The experiments were performed in the NBS experimental furnace under both natural gas and No. 2 fuel oil fired conditions. An on-line gas sampling/analysis system was used as a reference system for comparative evaluation of the stack gas monitors. The system is set up to determine the level of CO, CO/sub 2/, O/sub 2/, NO/NO/sub x/ and total hydrocarbons in the stack gases.

Presser, C.; Semerjian, H.G.

1984-10-01T23:59:59.000Z

249

U.S. - Canada Power System Outage Task Force: Final Report on the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Canada Power System Outage Task Force: Final Report on the - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations On August 14, 2003, the largest power blackout in North American history affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut and New Jersey, and the Canadian province of Ontario. U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations More Documents & Publications Blackout 2003: Blackout Final Implementation Report Blackout 2003: The August 14, 2003 Blackout One Year Later: Actions Taken

250

Construction Summary and As-Built Report for Ground Water Treatment System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Summary and As-Built Report for Ground Water Treatment Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site Construction Summary and As-Built Report for Ground Water Treatment System Monticello, Utah, Permeable Reactive Barrier Site More Documents & Publications Dispersivity Testing of Zero-Valent Iron Treatment Cells: Monticello, Utah, November 2005 Through February 2008 Third (March 2006) Coring and Analysis of Zero-Valent Iron Permeable Reactive Barrier, Monticello, Utah Performance Assessment and Recommendations for Rejuvenation of a Permeable

251

Improved Controls for Fusion RF Systems. Final technical report  

SciTech Connect

We have addressed the specific requirements for the integrated systems controlling an array of klystrons used for Lower Hybrid Current Drive (LHCD). The immediate goal for our design was to modernize the transmitter protection system (TPS) for LHCD on the Alcator C-Mod tokamak at the MIT Plasma Science and Fusion Center (MIT-PSFC). Working with the Alcator C-Mod team, we have upgraded the design of these controls to retrofit for improvements in performance and safety, as well as to facilitate the upcoming expansion from 12 to 16 klystrons. The longer range goals to generalize the designs in such a way that they will be of benefit to other programs within the international fusion effort was met by designing a system which was flexible enough to address all the MIT system requirements, and modular enough to adapt to a large variety of other requirements with minimal reconfiguration.

Casey, Jeffrey A. [Rockfield Research Inc., Las Vegas, NV (United States)

2011-11-08T23:59:59.000Z

252

Advanced energy system program. Final report, June 1986-April 1990  

SciTech Connect

The objectives of this program are to design, develop and demonstrate a natural-gas-fueled, highly recuperated, 50 kW Brayton-cycle cogeneration system for commercial, institutional, and multifamily residential applications. Marketing studies have shown that this Advanced Energy System (AES), with its many unique and cost-effective features, has the potential to offer significant reductions in annual electrical and thermal energy costs to the consumer. Specific advantages of the system that result in low cost of ownership are high electrical efficiency (30%, HHV), low maintenance, high reliability and long life (20 years). Significant technical features include: (1) an integral turbogenerator with shaft-speed permanent magnet generator; (2) a rotating assembly supported by compliant foil air bearings; (3) a formed-tubesheet plate/fin recuperator with 91% effectiveness; and (4) a bi-directional power conditioner to utilize the generator for system startup. The planned introduction of catalytic combustion will further enhance the economic and ecological attractiveness.

Trester, K.

1990-12-01T23:59:59.000Z

253

Metering Air Compressor Systems for Efficiency: A Progress Report  

E-Print Network (OSTI)

. ?Pneumatic Handbook - 7th Edition?. The Trade and Technical Press Limited, Crown House, Morden, Surrey, England. 2. Department of Energy (DOE). 1984. ?Energy Conservation - Compressed Air Systems, A Guidebook on Energy and Cost Savings?. DOE...

Joseph, B.

2005-01-01T23:59:59.000Z

254

Operability test report for the mobile color camera system (MCCS)  

SciTech Connect

This supporting document is the Operational Test Procedure for the Mobile Color Camera System (MCCS). This is a purged camera for temporary in-tank video use in Hanford waste tanks.

Esvelt, C.A.

1997-01-28T23:59:59.000Z

255

Solar heating system installed at Jackson, Tennessee. Final report  

SciTech Connect

The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)

None

1980-10-01T23:59:59.000Z

256

Final Report for the Virtual Reliability Realization System LDRD  

SciTech Connect

Current approaches to reliability are not adequate to keep pace with the need for faster, better and cheaper products and systems. This is especially true in high consequence of failure applications. The original proposal for the LDRD was to look at this challenge and see if there was a new paradigm that could make reliability predictions, along with a quantitative estimate of the risk in that prediction, in a way that was faster, better and cheaper. Such an approach would be based on the underlying science models that are the backbone of reliability predictions. The new paradigm would be implemented in two software tools: the Virtual Reliability Realization System (VRRS) and the Reliability Expert System (REX). The three-year LDRD was funded at a reduced level for the first year ($120K vs. $250K) and not renewed. Because of the reduced funding, we concentrated on the initial development of the expertise system. We developed an interactive semiconductor calculation tool needed for reliability analyses. We also were able to generate a basic functional system using Microsoft Siteserver Commerce Edition and Microsoft Sequel Server. The base system has the capability to store Office documents from multiple authors, and has the ability to track and charge for usage. The full outline of the knowledge model has been incorporated as well as examples of various types of content.

DELLIN, THEODORE A.; HENDERSON, CHRISTOPHER L.; O'TOOLE, EDWARD J.

2000-12-01T23:59:59.000Z

257

Development of an AC Module System: Final Technical Report  

SciTech Connect

The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more favorable as the product matures and is made in high volumes. GreenRay's early customers have been highly enthusiastic about the AC Module system benefits.

Suparna Kadam; Miles Russell

2012-06-15T23:59:59.000Z

258

2-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM  

E-Print Network (OSTI)

2-1 1999 SITE ENVIRONMENTAL REPORT CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM In 1999, Brookhaven National Laboratory continued to develop and implement an Environmental Management System to ensure that it operates in an environmentally responsible manner. The Laboratory's Environmental Management System

259

Advanced thermal barrier coating system development. Technical progress report  

SciTech Connect

The objectives of the program are to provide an improved TBC system with increased temperature capability and improved reliability relative to current state of the art TBC systems. The development of such a coating system is essential to the ATS engine meeting its objectives. The base program consists of three phases: Phase 1: Program Planning--Complete; Phase 2: Development; Phase 3: Selected Specimen--Bench Test. Work is currently being performed in Phase 2 of the program. In Phase 2, process improvements will be married with new bond coat and ceramic materials systems to provide improvements over currently available TBC systems. Coating reliability will be further improved with the development of an improved lifing model and NDE techniques. This will be accomplished by conducting the following program tasks: II.1 Process Modeling; II.2 Bond Coat Development; II.3 Analytical Lifing Model; II.4 Process Development; II.5 NDE, Maintenance and Repair; II.6 New TBC Concepts. A brief summary is given of progress made in each of these 6 areas.

NONE

1996-06-10T23:59:59.000Z

260

Advanced thermal barrier coating system development. Technical progress report  

SciTech Connect

The objectives of the program are to provide an improved TBC system with increased temperature capability and improved reliability relative to current state of the art TBC systems. The development of such a coating system is essential to the ATS engine meeting its objectives. The base program consists of three phases: Phase 1: Program Planning--Complete; Phase 2: Development; Phase 3: Selected Specimen--Bench Test. Work is currently being performed in Phase 2 of the program. In Phase 2, process improvements will be married with new bond coat and ceramic materials systems to provide improvements over currently available TBC systems. Coating reliability will be further improved with the development of an improved lifing model and NDE techniques. This will be accomplished by conducting the following program tasks: II.1 Process Modeling; II.2 Bond Coat Development; II.3 Analytical Lifing Model; II.4 Process Development; II.5 NDE, Maintenance and Repair; II.6 New TBC Concepts. A brief summary of progress made in each of these 6 areas is given.

NONE

1996-10-04T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Confinement Vessel Assay System: Calibration and Certification Report  

SciTech Connect

Los Alamos National Laboratory has a number of spherical confinement vessels (CVs) remaining from tests involving nuclear materials. These vessels have an inner diameter of 6 feet with 1 to 2 inch thick steel walls. The goal of the Confinement Vessel Disposition (CVD) project is to remove debris and reduce contamination inside the vessels. The Confinement Vessel Assay System (CVAS) was developed to measure the amount of SNM in CVs before and after cleanout. Prior to cleanout, the system will be used to perform a verification measurement of each vessel. After cleanout, the system will be used to perform safeguards-quality assays of {le} 100-g {sup 239}Pu equivalent in a vessel for safeguards termination. The system was calibrated in three different mass regions (low, medium, and high) to cover the entire plutonium mass range that will be assayed. The low mass calibration and medium mass calibration were verified for material positioned in the center of an empty vessel. The systematic uncertainty due to position bias was estimated using an MCNPX model to simulate the response of the system to material localized at various points along the inner surface of the vessel. The background component due to cosmic ray spallation was determined by performing measurements of an empty vessel and comparing to measurements in the same location with no vessel present. The CVAS has been tested and calibrated in preparation for verification and safeguards measurements of CVs before and after cleanout.

Frame, Katherine C. [Los Alamos National Laboratory; Bourne, Mark M. [Los Alamos National Laboratory; Crooks, William J. [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Gomez, Cipriano [Retired CMR-OPS: OPERATIONS; Mayo, Douglas R. [Los Alamos National Laboratory; Miko, David K. [Los Alamos National Laboratory; Salazar, William R. [Los Alamos National Laboratory; Stange, Sy [Los Alamos National Laboratory; Vigil, Georgiana M. [Los Alamos National Laboratory

2012-07-17T23:59:59.000Z

262

Enforcement Guidance Supplement 03-02, Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03-02 03-02 Department of Energy Washington, DC 20585 September 5, 2003 MEMORANDUM FOR: DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: STEPHEN M. SOHINKI DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGS), which provide information or recommendations only and impose

263

PC Electronic Data Reporting Option (PEDRO) System - Patch Archive  

U.S. Energy Information Administration (EIA) Indexed Site

System - Patch Archive System - Patch Archive PEDRO Patches: Occasionally, updates to the PEDRO software are required that are not significant enough to justify a complete recreation and mailout of the software for every user. Instead, a "patch" is developed. A patch is a bundled file (or files) that are sent out to PEDRO users to update the system without completely replacing or reinstalling PEDRO. Pedro Communications Patch for All Versions - March 2007 The following process corrects the following error: Application Terminated. Error accessing external object property hostname... This error is due to some Pedro 6.2 Installation CD's that are missing a required Pedro 6.2 ActiveX component. This component allows for the connection and transfer of your Pedro 6.2 entered survey data to the EIA anonymous ftp server

264

Surface moisture measurement system hardware acceptance test report  

SciTech Connect

This document summarizes the results of the hardware acceptance test for the Surface Moisture Measurement System (SMMS). This test verified that the mechanical and electrical features of the SMMS functioned as designed and that the unit is ready for field service. The bulk of hardware testing was performed at the 306E Facility in the 300 Area and the Fuels and Materials Examination Facility in the 400 Area. The SMMS was developed primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement in organic and ferrocyanide watch list tanks.

Ritter, G.A., Westinghouse Hanford

1996-05-28T23:59:59.000Z

265

Moltox™ Chemical Air Separation System-A Progress Report  

E-Print Network (OSTI)

development phase. PROCESS DESCRIPTION The MOLTOX system is based on the reversible react10n of oxygen with sod1um and potassium nitrite to form nitrate. This reaction can be used in one or both of two HOLTOX system salt loop types, Pressure Swing... SWING ABSORPTI0r-N,"-)--+-_"", 3. Combined Pressure For any application and Thermal Swing in wh1ch heat and pressure energy are avallable. Simplified process diagrams of the two salt loop types are shown 1n F1gure 1. These d1agrams show...

Erickson, D. C.; Brown, W. R.; Dunbobbin, B. R.; Massey, R. G.

266

On-Orbit Asset Management System, September 1995. Final report  

SciTech Connect

Declining budgets have prompted the need to decrease launch cost, increase satellite lifetime, and accomplish more with each satellite. This study evaluates an OOAMS system for its ability to lengthen lifetime of on-orbit assets, decrease the number of satellites required to perform a mission, increase responsiveness, and provide increased mission capability/tactical advantage. Lifetime analysis suggest that the larger satellite systems (NASA and military communication systems, surveillance satellites and earth observing satellites) would benefit most from a nuclear bimodal OOAMS. Evaluation of satellite constellations indicate that a modest reduction in the number of satellites could be realized using OOAMS if the thermal restart capability was at least ten. An OOAMS could improve the responsiveness (launching of new assets) using on-orbit reconstitution of assets. A top level utility assessment was done to address system cost issues relating to funding profiles, first unit cost, and break-even analysis. From mission capture and orbital lifetime criteria, the recommended minimum orbital altitude is 900 km. The on-orbit thermal restart capability should be increased from five to ten. Analysis of total impulse vs propellant consumed for selected missions suggests that total impulse be increased from 40 million to 48 million Newton-seconds.

NONE

1995-10-10T23:59:59.000Z

267

FY 2005 Quantum Cascade Laser Alignment System Final Report  

SciTech Connect

The Alignment Lasers Task of Pacific Northwest National Laboratory's (PNNL's) Remote Spectroscopy Project (Project PL211I) is a co-funded project between DOE NA-22 and a Classified Client. This project, which began in the second half of FY03, involved building and delivering a Quantum Cascade (QC) Laser Alignment System to be used for testing the pupil alignment of an infrared sensor by measuring the response from four pairs of diametrically opposed QC lasers. PNNL delivered the system in FY04 and provided technical assistance in FY05 culminating into a successful demonstration of the system. This project evolved from the Laser Development Task of PL211I, which is involved in developing novel laser technology to support development of advanced chemical sensors for detecting the proliferation of nuclear weapons. The laser systems are based on quantum cascade (QC) lasers, a new semiconductor source in the infrared. QC lasers can be tailored to emit light throughout the infrared region (3.5 ? 17 ?m) and have high output power and stability. Thus, these lasers provide an infrared source with superb power and spectral stability enabling them to be used for applications such as alignment and calibration in addition to chemical sensing.

Myers, Tanya L.; Cannon, Bret D.; Wojcik, Michael D.; Broocks, Bryan T.; Stewart, Timothy L.; Hatchell, Brian K.

2006-01-11T23:59:59.000Z

268

New Report Shows Trend Toward Larger Offshore Wind Systems, with 11  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report Shows Trend Toward Larger Offshore Wind Systems, with 11 Report Shows Trend Toward Larger Offshore Wind Systems, with 11 Advanced Stage Projects Proposed in U.S. Waters New Report Shows Trend Toward Larger Offshore Wind Systems, with 11 Advanced Stage Projects Proposed in U.S. Waters October 23, 2013 - 10:52am Addthis The Energy Department today released a new report showing progress for the U.S. offshore wind energy market in 2012, including the completion of two commercial lease auctions for federal Wind Energy Areas and 11 commercial-scale U.S. projects representing over 3,800 megawatts (MW) of capacity reaching an advanced stage of development. Further, the report highlights global trends toward building offshore turbines in deeper waters and using larger, more efficient turbines in offshore wind farms, increasing the amount of electricity delivered to consumers.

269

DOE Hydrogen and Fuel Cells Program: 2009 Annual Progress Report - Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Systems Analysis Systems Analysis Printable Version 2009 Annual Progress Report VII. Systems Analysis This section of the 2009 Progress Report for the DOE Hydrogen Program focuses on systems analysis. Each technical report is available as an individual Adobe Acrobat PDF. Download Adobe Reader. Systems Analysis Program Element Introduction, Fred Joseck, U.S. Department of Energy (PDF 411 KB) HyDRA: Hydrogen Demand and Resource Analysis Tool (PDF 243 KB), Johanna Levene, National Renewable Energy Laboratory Water Needs and Constraints for Hydrogen Pathways (PDF 99 KB), A.J. Simon, Lawrence Livermore National Laboratory Cost Implications of Hydrogen Quality Requirements (PDF 817 KB), Shabbir Ahmed, Argonne National Laboratory Macro-System Model (PDF 384 KB), Mark Ruth, National Renewable

270

Energy Department Expands Gas Gouging Reporting System to Include 1-800  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Expands Gas Gouging Reporting System to Include Expands Gas Gouging Reporting System to Include 1-800 Number: 1-800-244-3301 Energy Department Expands Gas Gouging Reporting System to Include 1-800 Number: 1-800-244-3301 September 6, 2005 - 9:50am Addthis Washington, DC - Energy Secretary Samuel W. Bodman announced today that the Department of Energy has expanded its gas gouging reporting system to include a toll-free telephone hotline. The hotline is available to American consumers starting today. "While we've largely seen the best of American generosity and unity throughout the recovery effort, we recognize that there are some bad actors that may try to take advantage of the situation. Consumers are our first line of defense in guarding against gas price gouging. I can assure you, our Administration - from the President down - takes this issue very

271

Advanced thermal barrier coating system development. Technical progress report, August 1, 1996--September 30, 1996  

SciTech Connect

Objectives of this program are to provide an advanced thermal barrier coating system with improved reliability and temperature capability. This report describes the coating/deposition process, repair, and manufacturing.

NONE

1996-10-04T23:59:59.000Z

272

Intern experience at Honeywell, Inc., Large Information Systems Division: an internship report  

E-Print Network (OSTI)

This report describes the author's internship assignment at Honeywell Inc. - Large Information Systems Division from January, 1982 through August, 1982. The purpose of the assignment was to fulfill the internship requirements...

Ismail, Abdel-Wahab Tarek, 1956-

2013-03-13T23:59:59.000Z

273

High-end-Computer System Performance: Science and Engineering - Final Report  

SciTech Connect

This report summarizes the research conducted as part of the UMD effort of the multi-site PERC project. This project developed and enhanced the Dyninst instrumentation system and the Active Harmony auto-tuning framework.

Hollingsworth, Jeffrey K.

2012-01-27T23:59:59.000Z

274

Guidelines for reporting parabolic trough solar electric system performance  

SciTech Connect

The purpose of this activity is to develop a generic methodology which can be used to track and compare the performance of parabolic trough power plants. The approach needs to be general enough to work for all existing and future parabolic trough plant designs, provide meaningful comparisons of year to year performance, and allow for comparisons between dissimilar plant designs. The approach presented here uses the net annual system efficiency as the primary metric for evaluating the performance of parabolic trough power plants. However, given the complex nature of large parabolic trough plants, the net annual system efficiency by itself does not adequately characterize the performance of the plant. The approach taken here is to define a number of additional performance metrics which enable a more comprehensive understanding of overall plant performance.

Price, H.W.

1997-06-01T23:59:59.000Z

275

Contractor-Specific Documentation & Information in PARS II  

Office of Environmental Management (EM)

Contractor-Specific Documentation & Information in PARS II DOE Office of Acquisition and Project Management established guidelines for documentation that should be available within...

276

Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report  

SciTech Connect

Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuel cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.

Petrecky, James; Ashley, Christopher

2014-07-21T23:59:59.000Z

277

Pentek metal coating removal system: Baseline report; Summary  

SciTech Connect

The Pentek metal coating removal system consists of the ROTO-PEEN Scaler, CORNER-CUTTER(R), and VAC-PAC(R). The system is designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M ROTO-PEEN tungsten carbide cutters, while the CORNER-CUTTER(R) uses solid needles for descaling activities. These are used with the VAC-PAC(R) vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each exposure is recommended, since the outdoor environment where the testing demonstration took place may skew the results. It is feasible that dust and noise levels will be higher in an enclosed operating environment. Other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

NONE

1997-07-31T23:59:59.000Z

278

Aviation Safety Reporting System 625 Ellis St. Suite 305 Mountain View California 94043  

E-Print Network (OSTI)

of the event. Those who work to improve aviation safety have long recognized that incident reporting fromAviation Safety Reporting System 625 Ellis St. Suite 305 Mountain View California 94043 Cabin Crew Safety Information Article Presented at the 17th International Aircraft Cabin Safety Symposium by Linda

279

FY 2006 Annual Progress Report for Heavy Vehicle Systems Optimization Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Heavy veHicle SyStemS Heavy veHicle SyStemS OptimizatiOn prOgram U.S. Department of Energy FreedomCAR and Vehicle Technologies Program 1000 Independence Avenue, S.W. Washington, DC 20585-0121 FY 2006 Annual Progress Report for Heavy Vehicle Systems Optimization Program Submitted to: U.S. Department of Energy Energy Efficiency and Renewable Energy FreedomCAR and Vehicle Technologies Program Advanced Vehicle Technology Analysis and Evaluation Lee Slezak, Technology Manager Heavy Vehicle Systems Optimization Program FY 2006 Annual Report iii CONTENTS I. Aerodynamic Drag Reduction......................................................................................................... 1 A. DOE Project on Heavy Vehicle Aerodynamic Drag .................................................................. 1

280

Fermilab Central Computing Facility: Energy conservation report and mechanical systems design optimization and cost analysis study  

SciTech Connect

This report is developed as part of the Fermilab Central Computing Facility Project Title II Design Documentation Update under the provisions of DOE Document 6430.1, Chapter XIII-21, Section 14, paragraph a. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis and should be considered as a supplement to the Title I Design Report date March 1986 wherein energy related issues are discussed pertaining to building envelope and orientation as well as electrical systems design.

Krstulovich, S.F.

1986-11-12T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Building thermal envelope systems and materials (BTESM) progress report for DOE Office of Buildings Energy Research  

SciTech Connect

The Monthly Report of the Building Thermal Envelope Systems and Materials (BTESM) Program is a monthly update of both in-house ORNL projects and subcontract activities in the research areas of building materials, wall systems, foundations, roofs, and building diagnostics. Presentations are not stand-alone paragraphs every month. Their principal values are the short-time lapse between accomplishment and reporting and their evolution over a period of several months.

Burn, G. (comp.)

1990-10-01T23:59:59.000Z

282

Building Thermal Envelope Systems and Materials (BTESM) progress report for DOE Office of Buildings Energy Research  

SciTech Connect

The Monthly Report of the Building Thermal Envelope Systems and Materials (BTESM) Program is a monthly update of both in-house ORNL projects and subcontract activities in the research areas of building materials, wall systems, foundations, roofs, and building diagnostics. Presentations are not stand-alone paragraphs every month. Their principal values are the short-time lapse between accomplishment and reporting and their evolution over a period of several months.

Burn, G. (comp.)

1990-12-01T23:59:59.000Z

283

Building Thermal Envelope Systems and Materials (BTESM) progress report for DOE Office of Buildings Energy Research  

SciTech Connect

The Monthly Report of the Building Thermal Envelope Systems and Materials (BTESM) Program is a monthly update of both in-house ORNL projects and subcontract activities in the research areas of building materials, wall systems, foundations, roofs, building diagnostics, and research utilization and technology transfer. Presentations are not stand-alone paragraphs every month. Their principal values are the short-time lapse between accomplishment and reporting and their evolution over a period of several months.

Burn, G. (comp.)

1990-01-01T23:59:59.000Z

284

La gestion des ports par une entit publique: aspects europens et environnementaux La gestion des ports par une entit publique  

E-Print Network (OSTI)

La gestion des ports par une entité publique: aspects européens et environnementaux « La gestion des ports par une entité publique: aspects européens et environnementaux » Thèse pour le Doctorat en,version1-25Apr2014 #12;La gestion des ports par une entité publique: aspects européens et environnementaux

Paris-Sud XI, Université de

285

Plate-Based Fuel Processing System Final Report  

SciTech Connect

On-board reforming of liquid fuels into hydrogen is an enabling technology that could accelerate consumer usage of fuel cell powered vehicles. The technology would leverage the convenience of the existing gasoline fueling infrastructure while taking advantage of the fuel cell efficiency and low emissions. Commercial acceptance of on-board reforming faces several obstacles that include: (1) startup time, (2) transient response, and (3) system complexity (size, weight and cost). These obstacles are being addressed in a variety of projects through development, integration and optimization of existing fuel processing system designs. In this project, CESI investigated steam reforming (SR), water-gas-shift (WGS) and preferential oxidation (PrOx) catalysts while developing plate reactor designs and hardware where the catalytic function is integrated into a primary surface heat exchanger. The plate reactor approach has several advantages. The separation of the reforming and combustion streams permits the reforming reaction to be conducted at a higher pressure than the combustion reaction, thereby avoiding costly gas compression for combustion. The separation of the two streams also prevents the dilution of the reformate stream by the combustion air. The advantages of the plate reactor are not limited to steam reforming applications. In a WGS or PrOx reaction, the non-catalytic side of the plate would act as a heat exchanger to remove the heat generated by the exothermic WGS or PrOx reactions. This would maintain the catalyst under nearly isothermal conditions whereby the catalyst would operate at its optimal temperature. Furthermore, the plate design approach results in a low pressure drop, rapid transient capable and attrition-resistant reactor. These qualities are valued in any application, be it on-board or stationary fuel processing, since they reduce parasitic losses, increase over-all system efficiency and help perpetuate catalyst durability. In this program, CESI took the initial steam reforming plate-reactor concept and advanced it towards an integrated fuel processing system. A substantial amount of modeling was performed to guide the catalyst development and prototype hardware design and fabrication efforts. The plate-reactor mechanical design was studied in detail to establish design guidelines which would help the plate reactor survive the stresses of repeated thermal cycles (from start-ups and shut-downs). Integrated system performance modeling was performed to predict system efficiencies and determine the parameters with the most significant impact on efficiency. In conjunction with the modeling effort, a significant effort was directed towards catalyst development. CESI developed a highly active, sulfur tolerant, coke resistant, precious metal based reforming catalyst. CESI also developed its own non-precious metal based water-gas shift catalyst and demonstrated the catalysts durability over several thousands of hours of testing. CESI also developed a unique preferential oxidation catalyst capable of reducing 1% CO to < 10 ppm CO over a 35 C operating window through a single pass plate-based reactor. Finally, CESI combined the modeling results and steam reforming catalyst development efforts into prototype hardware. The first generation 3kW(e) prototype was fabricated from existing heat-exchanger plates to expedite the fabrication process. This prototype demonstrated steady state operation ranging from 5 to 100% load conditions. The prototype also demonstrated a 20:1 turndown ratio, 10:1 load transient operation and rapid start-up capability.

Carlos Faz; Helen Liu; Jacques Nicole; David Yee

2005-12-22T23:59:59.000Z

286

Coal-fired high performance power generating system. Final report  

SciTech Connect

As a result of the investigations carried out during Phase 1 of the Engineering Development of Coal-Fired High-Performance Power Generation Systems (Combustion 2000), the UTRC-led Combustion 2000 Team is recommending the development of an advanced high performance power generation system (HIPPS) whose high efficiency and minimal pollutant emissions will enable the US to use its abundant coal resources to satisfy current and future demand for electric power. The high efficiency of the power plant, which is the key to minimizing the environmental impact of coal, can only be achieved using a modern gas turbine system. Minimization of emissions can be achieved by combustor design, and advanced air pollution control devices. The commercial plant design described herein is a combined cycle using either a frame-type gas turbine or an intercooled aeroderivative with clean air as the working fluid. The air is heated by a coal-fired high temperature advanced furnace (HITAF). The best performance from the cycle is achieved by using a modern aeroderivative gas turbine, such as the intercooled FT4000. A simplified schematic is shown. In the UTRC HIPPS, the conversion efficiency for the heavy frame gas turbine version will be 47.4% (HHV) compared to the approximately 35% that is achieved in conventional coal-fired plants. This cycle is based on a gas turbine operating at turbine inlet temperatures approaching 2,500 F. Using an aeroderivative type gas turbine, efficiencies of over 49% could be realized in advanced cycle configuration (Humid Air Turbine, or HAT). Performance of these power plants is given in a table.

NONE

1995-08-31T23:59:59.000Z

287

Advanced coal-fueled gas turbine systems. Final report  

SciTech Connect

The configuration of the subscale combustor has evolved during the six years of this program from a system using only an impact separator to remove particulates to a system which also included a slagging cyclone separator before the lean-quench combustor. The system also now includes active slag tapping after the impact separator rather than a bucket to collect the slag. The subscale 12 MM Btu/hr (higher heating value, HHV) slagging combustor has demonstrated excellent coal-fired operation at 6 atm. The combustor has fired both coal-water mixtures (CWM) and pulverized coal (PC). Three Wyoming subbituminous coals and two bituminous coals have been successfully fired in the TVC. As a result of this active testing, the following conclusions may be drawn: (1) it was possible to achieve the full design thermal capacity of 12 MM Btu/hr with the subscale slagging combustor, while burning 100% pulverized coal and operating at the design pressure of 6 atm; (2) because of the separate-chamber, rich-lean design of the subscale slagging combustor, NO{sub x} emissions that easily meet the New Source Performance Standards (NSPS) limits were achieved; (3) carbon burnout efficiency was in excess of 99% when 100% coal-fired; (4) ninety percent of the ash can be separated as slag in the impact separator, and a total 98 to 99% removed with the addition of the slagging cyclone separator; (5) Objectives for third-stage exit temperature (1850{degrees}F), and exit temperature pattern factor (14%) were readily achieved; (6) overall pressure loss is currently an acceptable 5 to 6% without cyclone separator and 7 to 9% with the cyclone; and (7) feeding pulverized coal or sorbent into the combustor against 6 atm pressure is achievable.

Not Available

1993-08-01T23:59:59.000Z

288

Generic Disposal System Modeling--Fiscal Year 2011 Progress Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12/2011 12/2011 Rev. 2 FCRD- T10-201 0-00005 FCRD Technical Integration Office (TIO) DOCUMENT NUMBER REQUEST TRANSMITTAL SHEET 1. Document Information Document Title/Description: Generic Disposal System Modeling--Fiscal Year 2011 Revision: 0 Progress Re~ort Assigned Document Number: FCRD-USED-2011-000184 Effective Start Date: 08/1112011 Document Author/Creator: D. Clayton, G. Freeze, T. Hadgu, E. Hardin, J. Lee, OR .~: J. Prouty, R. Rogers, W.M. Nutt, J. Berkholzer, H.H. Liu, L. Zheng, S. Chu Document Owner: Palmer Vaughn Date Range: Originating Organization: Sandia National Laboratories From: To: Milestone OM1 ~M2 OM3 ~M4 o Not a Milestone Milestone Number:: M21UF034101 and M41UF035102 Work Package WBS Number: FTSN11 UF0341 and FTSN11 UF0351; 1.02.08.03 Controlled Unclassified Infonnation (CUI) Type ~ None OOUO OAT o Other FCRD SYSTEM: Year: o FUEL Fuels 2011 OINTL International

289

Glossary of Screen Labels for PARS II V1 | Department of Energy  

Office of Environmental Management (EM)

Glossary of Screen Labels for PARS II V1 More Documents & Publications PARS II Standard Operating Procedure (SOP) PARSIISOP.pdf Proposed Data Elements for PARS II Web Application...

290

Research and Practice in Federated Information Systems Report of the EFIS '2000 International Workshop  

E-Print Network (OSTI)

for federated system integration, and the use of meta- directories in building federations. DetailsResearch and Practice in Federated Information Systems Report of the EFIS '2000 International Workshop W. Hasselbring W.-J. van den Heuvel y G.J. Houben z R.-D. Kutsche x B. Rieger M. Roantree k K

Houben, Geert-Jan

291

CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1  

E-Print Network (OSTI)

CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1 2 Environmental an improved Environmental Management System (EMS) to ensure that it operates in an environmentally responsible of Energy 1998 Energy Management Achievement Award for water conservation efforts. Wa- ter conservation

292

Conventional Facilities Chapter 6: HVAC Systems 6-1 NSLS-II Preliminary Design Report  

E-Print Network (OSTI)

Conventional Facilities Chapter 6: HVAC Systems 6-1 NSLS-II Preliminary Design Report 6 MECHANICAL ­ HVAC SYSTEMS 6.1 Design Criteria 6.1.1 Codes and Standards The latest edition of the codes, standards have adequate capacity and head, no chilled water pumps #12;Conventional Facilities Chapter 6: HVAC

Ohta, Shigemi

293

241-AZ-101 Waste Tank Color Video Camera System Shop Acceptance Test Report  

SciTech Connect

This report includes shop acceptance test results. The test was performed prior to installation at tank AZ-101. Both the camera system and camera purge system were originally sought and procured as a part of initial waste retrieval project W-151.

WERRY, S.M.

2000-03-23T23:59:59.000Z

294

Lower Flathead System Fisheries Study, 1986 Interim Report.  

SciTech Connect

We believe our results have clearly shown Kerr hydroelectric operations and operational constraints have negatively affected Flathead River trout and northern pike populations and the aquatic habitat which support them. Even so, it is possible to mitigate many of these impacts and develop a very important fishery. Trout abundance in the lower Flathead averaged only 19 fish per kilometer, the lowest abundance of trout for a river of this size in Montana. Little main channel spawning by trout was observed and most spawning probably occurs in tributaries. Lower river tributaries support resident populations of brook, rainbow, brown, and cutthroat trout; and a small resident population of bull trout is present in the South Fork of the Jocko River. Using weirs, spawning runs of rainbow and brown trout from the main river were monitored entering the Jocko River and the Post/Mission Creek system. Utilization of Crow Creek by main river trout stocks of trout was limited to the 6 km segment below Crow Dam. Evaluations of tributary spawning gravels showed high levels of silt which would suggest poor survival of trout eggs. Excessive harvest in the tributaries was indicated by analysis of age class structure and abundance of trout greater than 200 mm.

Bradshaw, William H.; DosSantos, Joseph M.; Darling, James M.

1986-08-01T23:59:59.000Z

295

Cooperative field test program for wind systems. Final report  

SciTech Connect

The objectives of the Federal Wind Energy Program, managed by the US Department of Energy (DOE), are (1) to assist industry and utilities in achieving a multi-regional US market penetration of wind systems, and (2) to establish the United States as the world leader in the development of advanced wind turbine technology. In 1984, the program conducted a series of planning workshops with representatives from the wind energy industry to obtain input on the Five-Year Research Plan then being prepared by DOE. One specific suggestion that came out of these meetings was that the federal program should conduct cooperative research tests with industry to enhance the technology transfer process. It was also felt that the active involvement of industry in DOE-funded research would improve the state of the art of wind turbine technology. DOE established the Cooperative Field Test Program (CFTP) in response to that suggestion. This program was one of the first in DOE to feature joint industry-government research test teams working toward common objectives.

Bollmeier, W.S. II; Dodge, D.M.

1992-03-01T23:59:59.000Z

296

Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Network Requirements Reviews Reports Careers Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Reports ESnet publishes reports from science network Program Requirements Reviews on a regular basis. View the most recent of these below. Sort by: Date | Author | Type 2012 Eli Dart, Brian Tierney, Editors, "Biological and Environmental Research Network Requirements Workshop, November 2012 - Final Report"", November 29, 2012, LBNL LBNL-6395E

297

Technical analysis of US Army Weapons Systems and related advanced technologies of military interest. Final report  

SciTech Connect

This report summarizes the activities and accomplishments of an US Army technology security project designed to identify and develop effective policy guidelines for militarily critical technologies in specific Army systems and in broad generic technology areas of military interest, Individual systems analyses are documented in separate Weapons Systems Technical Assessments (WSTAs) and the general generic technology areas are evaluated in the Advanced Technology Assessment Reports (ATARs), However, specific details of these assessments are not addressed here, only recommendations regarding aspects of the defined approach, methodology, and format are provided and discussed.

NONE

1991-06-14T23:59:59.000Z

298

Options for reducing refrigerant emissions from supermarket systems. Final report, February-September 1994  

SciTech Connect

The report was prepared to assist personnel responsible for the design, construction, and maintenance of retail food refrigeration equipment in making knowledgeable decisions regarding the implementation of refrigerant-emissions-reducing practices and technologies. It characterizes the design of typical supermarket refrigeration systems and focuses on why these types of systems have high rates of refrigerant emissions. Three case studies are provided of companies that have successfully implemented emission-reducing practices and technologies. The report discusses a variety of technical and procedural options that can be applied to existing systems and in new construction.

Troy, E.F.

1997-04-01T23:59:59.000Z

299

Molten-Caustic-Leaching (Gravimelt) system integration project. Final report  

SciTech Connect

The objectives of this program were to design, construct, shakedown and operate an integrated MCL test circuit to demonstrate the technical capability of the process for producing a demineralized and desulfurized coal that meets New Source Performance Standards (NSPS), to test process conditions aimed at lower costs, and to deliver product coal. These objectives were met by the procurement, construction, and operation of the integrated test circuit. Shakedown and a 63-test process matrix resulted in the production of about 3,700 pounds of treated coal. Product MCL coal may be used to displace oil in some turbine and diesel engines and may be used in the retrofit of oil-fired boilers. Two high sulfur, high ash coals and one medium sulfur, high ash coal representative of the Eastern United States coal production were processed: Pittsburgh No. 8 (Powhatan No. 6 mine), Kentucky No. 9, and Pittsburgh No. 8 (Blacksville No. 2 mine). Although mild kiln operating conditions (325 to 415{degree}C and 1 to 2.3 hours residence time) and low caustic to coal ratios (1:1 to 3:1) were used, the combination of continuous operation and rigorous exclusion of air from the system allowed the production of MCL coal that had product sulfur content was well below NSPS standards, very low carbonate production, very little volatile losses, and low alkali retention by the product MCL coal. Optimization testing resulted in a product coal containing 0.2 to 0.4 percent sulfur (0.26 to 0.6 lbs SO{sub 2}/million Btu) and 0.15 to 0.5 percent ash with more than 90 percent organic sulfur removal, {approximately}95 percent SO{sub 2} reduction from run-of-mine coal, {approximately}91 percent SO{sub 2} reduction from precleaned process feed coal, and with heat content of about 14,000 Btu per pound.

Not Available

1993-03-01T23:59:59.000Z

300

Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs-Summary Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs-Summary Report LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman July 2013 PNNL- 22641 Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs-Summary Report LR O'Neil TJ Vanderhorst, Jr MJ Assante J Januszewski, III DH Tobey R Leo TJ Conway K Perman Contributors: SGC Panel Members July, 2013 Prepared by: Pacific Northwest National Laboratory and NBISE Secure Power Systems Professional Project Team This document is a summarization of the report, Developing Secure Power Systems

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Los Alamos Tritium Systems Test Assembly the Los Alamos Tritium Systems Test Assembly Facility Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility The purpose of this document is to report the results of a survey conducted at the Los Alamos Tritium Systems Test Assembly (TSTA Facility). The survey was conducted during the week of 3/20/00. The primary purpose of the survey is to identify facility conditions and issues that need to be addressed to transfer responsibility for the facility from the Office of Science (SC) to the Office of Environmental Management (EM). The second purpose is to provide EM with insight regarding the facility's risks and liabilities, which may influence the management of eventual downstream life-cycle activities. The survey and this report are part of a process for implementing the

302

Energy Management of Steam Distribution Systems Through Energy Audits and Computerized Reporting Programs  

E-Print Network (OSTI)

ENERGY KANAGEKBNT OF STEAM DISTRIBUTION SYSTEMS THROUGH BNKRGY AUDITS AND COItPlTl'ERIZED REPORTING PROGRAtIS NORMAN J. RIVERS and HARTIN MANDZUK Armstrong Machine Works, Inc. Three Rivers, Michigan ABSTRACT This presentation will highlight... the economic losses associated with steam distribution systems and how to establish good energy management programs to reduce energy cost by 15 to 25 percent. Recognizing energy losses in steam systems involves I 1. Steam lost through defective valves...

Rivers, N.; Mandzuk, N.

303

Acceptance test report for the Tank 241-C-106 in-tank imaging system  

SciTech Connect

This document presents the results of Acceptance Testing of the 241-C-106 in-tank video camera imaging system. The purpose of this imaging system is to monitor the Project W-320 sluicing of Tank 241-C-106. The objective of acceptance testing of the 241-C-106 video camera system was to verify that all equipment and components function in accordance with procurement specification requirements and original equipment manufacturer`s (OEM) specifications. This document reports the results of the testing.

Pedersen, L.T.

1998-05-22T23:59:59.000Z

304

PARS II New Contractor Information for Interconnection Security...  

Office of Environmental Management (EM)

V1.0 (November 18, 2010) The Department of Energy (DOE) Headquarters Program Cyber Security Plan (PCSP), dated February 2008, requires the Project Assessment and Reporting System...

305

E-Print Network 3.0 - acceleration ionique par Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

ionique par mission secondaire est bien... Analyse de couches ou multicouches par SIMS :interprtation du profil aux interfaces M. AU COUTURIER... beam induced accelerated...

306

Report: Modular Safeguards to Create Holistic Security Requirement Specifications for System of Systems  

Science Journals Connector (OSTI)

The specification of security requirements for systems of systems is often an activity that is forced upon non-security experts and performed under time pressure. This paper describes how we have addressed this p...

Albin Zuccato; Nils Daniels; Cheevarat Jampathom…

2010-01-01T23:59:59.000Z

307

Ris Energy Report 4 System control and communication 4 9 System control and communication  

E-Print Network (OSTI)

a useful degree of robustness to the system. Energy systems are increasingly market-based Energy systems at least three markets: long-term bilat- eral energy contracts, a day-ahead market (12­36 hours running of the markets. · Adding large amounts of renewable energy (RE) to the mix is a challenge

308

Report  

NLE Websites -- All DOE Office Websites (Extended Search)

DISCLAIMER DISCLAIMER Neither Pinnacle Technologies, Inc. nor any person acting on behalf of Pinnacle: * Makes any warranty or representation, express or implied, with respect to the accuracy, completeness, or usefulness of the information contained in this report, or that the use of any apparatus, method or process disclosed in this report may not infringe privately owned rights; or * Assumes any liability with respect to the use of, or for damages resulting from the use of, any information, apparatus, method or process disclosed in this report Stimulation Technologies for Deep Well Completions DE-FC26-02NT41663 Final Report for National Energy Technology Laboratory Morgantown, WV Project No.: USDE-0511 Report Date: December 2005 By:

309

CONTRIBUTION A L'TUDE DES SOLUTIONS DE GAZ PAR SPECTROGRAPHIE INFRAROUGE Par Mlle G. PAILLARD.  

E-Print Network (OSTI)

disparaît en solution; il y a donc empêchement de la rotation par interactions moléculaires; 2° les ba ndes non polaires, le tétrachlorure et le sulfure de car- bone. Cette étude a été faite dans tout le cube de solvant). 2o La résolution de problèmes d'ordre optique : - Mise en évidence du gaz dans les

Boyer, Edmond

310

Advanced turbine systems program conceptual design and product development: Quarterly report, November 1993--January 1994  

SciTech Connect

This report describes progress made in the advanced turbine systems program conceptual design and product development. The topics of the report include selection of the Allison GFATS, castcool technology development for industrial engines test plan and schedule, code development and background gathering phase for the ultra low NOx combustion technology task, active turbine clearance task, and water vapor/air mixture cooling of turbine vanes task.

NONE

1995-01-01T23:59:59.000Z

311

Working Group Report on - Space Nuclear Power Systems and Nuclear Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Group Report on - Space Nuclear Power Systems and Nuclear Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D "Even though one cannot anticipate the answers in basic research, the return on the public's investment can be maximized through long-range planning of the most promising avenues to explore and the resources needed to explore them." (p. v) "Pursuit of this goal entails developing new technologies and advanced facilities, educating young scientists, training a technical workforce, and contributing to the broader science and technology enterprise?." (p. vi) Ref:: "Nuclear Science: A Long Range Plan", DOE/NSF, Feb. 1996. The purpose of this effort is to develop the first iteration of a

312

Working Group Report on - Space Nuclear Power Systems and Nuclear Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Group Report on - Space Nuclear Power Systems and Nuclear Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D "Even though one cannot anticipate the answers in basic research, the return on the public's investment can be maximized through long-range planning of the most promising avenues to explore and the resources needed to explore them." (p. v) "Pursuit of this goal entails developing new technologies and advanced facilities, educating young scientists, training a technical workforce, and contributing to the broader science and technology enterprise?." (p. vi) Ref:: "Nuclear Science: A Long Range Plan", DOE/NSF, Feb. 1996. The purpose of this effort is to develop the first iteration of a

313

Model documentation report: Commercial Sector Demand Module of the National Energy Modeling System  

SciTech Connect

This report documents the objectives, analytical approach and development of the National Energy Modeling System (NEMS) Commercial Sector Demand Module. The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated through the synthesis and scenario development based on these components. This report serves three purposes. First, it is a reference document providing a detailed description for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its statistical and forecast reports (Public Law 93-275, section 57(b)(1)). Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects.

NONE

1995-02-01T23:59:59.000Z

314

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

Lee Davison

2009-06-30T23:59:59.000Z

315

Occurrence reporting and processing system (ORPS) lessons learned: Tools to improve workplace performance  

SciTech Connect

Various Department of Energy (DOE) orders require DOE and DOE contractor personnel to review abnormal events to gain lessons learned information. The term ``event`` is used to mean a real-time occurrence. When reviewing events data, it must be possible to determine what happened and why (including root causes), the impacts, the appropriate corrective actions, and any lessons learned that might be applicable to activities of other operations or contractors. Merely obtaining the information will not prevent occurrence of a similar event; contributing conditions must be corrected. It is important for managers, trainers, and others to learn from the events of others so that they may apply these experiences to their own activities. Reports of events must be analyzed to determine possible applicability to other facilities and/or job functions. Relevant information can then be used to correct defects and improve facilities and operations, thus making them more efficient and safer for all employees. Lessons learned information is particularly helpful in planning employee training and in developing training curriculum and programs. Lessons learned information can be obtained from many sources. It can be found in the Safety Performance Measurement System`s Computerized Accident/Incident Reporting System (CAIRS) module, the S&H Publications module, the Unusual Occurrence Reports module, and the Office of Nuclear Safety ``Operating Experience Weekly Summary.`` One important source of lessons teamed information is the Occurrence Reporting and Processing System (ORPS) database, which contains event data from September 1, 1990, to the present. This report discusses this source.

Commander, S.L.

1992-12-31T23:59:59.000Z

316

Development, Demonstration, and Field Testing of Enterprise-Wide Distributed Generation Energy Management System: Final Report  

SciTech Connect

This report details progress on subcontract NAD-1-30605-1 between the National Renewable Energy Laboratory and RealEnergy (RE), the purpose of which is to describe RE's approach to the challenges it faces in the implementation of a nationwide fleet of clean cogeneration systems to serve contemporary energy markets. The Phase 2 report covers: utility tariff risk and its impact on market development; the effect on incentives on distributed energy markets; the regulatory effectiveness of interconnection in California; a survey of practical field interconnection issues; trend analysis for on-site generation; performance of dispatch systems; and information design hierarchy for combined heat and power.

Greenberg, S.; Cooley, C.

2005-01-01T23:59:59.000Z

317

Preoperational test report, cross-site transfer water flush system (POTP-001)  

SciTech Connect

This report documents the results of the testing performed per POTP-001, for the Cross-Site Transfer Water Flush System. (HNF-1552, Rev. 0) The Flush System consists of a 47,000 gallon tank (302C), a 20 hp pump, two 498kW heaters, a caustic addition pump, various valves, instruments, and piping. The purpose of this system is to provide flush water at 140 F, 140gpm, and pH 11-12 for the Cross-Site Transfer System operation.

Parsons, G.L.

1998-02-20T23:59:59.000Z

318

Characterization of radioactive contamination inside pipes with the Pipe Explorer{trademark} system. Final report  

SciTech Connect

The Department of Energy (DOE) is currently in the process of decommissioning and dismantling many of its nuclear materials processing facilities that have been in use for several decades. Site managers throughout the DOE complex must employ the safest and most cost effective means to characterize, remediate and recycle or dispose of hundreds of miles of potentially contaminated piping and duct work. The DOE discovered that standard characterization methods were inadequate for its pipes, drains, and ducts because many of the systems are buried or encased. In response to the DOE`s need for a more specialized characterization technique, Science and Engineering Associates, Inc. (SEA) developed the Pipe Explorer{trademark} system through a DOE Office of Science and Technology (OST) contract administered through the Federal Energy Technology Center (FETC). The purpose of this report is to serve as a comprehensive overview of all phases of the Pipe Explorer{trademark} development project. The report is divided into 6 sections. Section 2 of the report provides an overview of the Pipe Explorer{trademark} system, including the operating principles of using an inverting membrane to tow sensors into pipes. The basic components of the characterization system are also described. Descriptions of the various deployment systems are given in Section 3 along with descriptions of the capabilities of the deployment systems. During the course of the development project 7 types of survey instruments were demonstrated with the Pipe Explorer{trademark} and are a part of the basic toolbox of instruments available for use with the system. These survey tools are described in Section 4 along with their typical performance specifications. The 4 demonstrations of the system are described chronologically in Section 5. The report concludes with a summary of the history, status, and future of the Pipe Explorer{trademark} system in Section 6.

Cremer, C.D.; Kendrick, D.T.; Lowry, W.; Cramer, E.

1997-09-30T23:59:59.000Z

319

Renewable wood fuel: Fuel feed system for a pulverized coal boiler. Final report  

SciTech Connect

This report evaluates a pilot test program conducted by New York State Gas & Electric Corporation to evaluate the feasibility of co-firing a pulverized coal plant with renewable wood fuels. The goal was to establish that such a co-firing system can reduce air emissions while maintaining good operational procedures and cost controls. The test fuel feed system employed at Greenidge Station`s Boiler 6 was shown to be effective in feeding wood products. Emission results were promising and an economic analysis indicates that it will be beneficial to pursue further refinements to the equipment and systems. The report recommends further evaluation of the generation and emission impacts using woods of varied moisture contents and at varied Btu input rates to determine if a drying system would be a cost-effective option.

NONE

1996-01-01T23:59:59.000Z

320

Title I design summary report, initial tank retrieval systems, project W-211  

SciTech Connect

This document provides the Title I (preliminary) design for the Tank 241-SY-101 (101-SY) retrieval system. The design reflects an integrated retrieval approach for 101-SY, whereby the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The Title I Design Summary Report includes narrative and sketches that describe the technical aspect of the project, as well as updated cost and schedule baselines for the 101-SY retrieval system.

Rieck, C.A.

1995-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Engineering development of coal-fired high-performance power systems. Technical report, July - September 1996  

SciTech Connect

A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, AlliedSignal Aerospace Equipment Systems, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase I of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalent size PC plant. The concept uses a pyrolyzation process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). It is a pulverized fuel-fired boiler/airheater where steam and gas turbine air are indirectly heated. The fuel gas generated in the pyrolyzer is then used to heat the gas turbine air further before it enters the gas turbine. The project is currently in Phase 2 which includes engineering analysis, laboratory testing and pilot plant testing. Research and development is being done on the HIPPS systems that are not commercial or being developed on other projects. Pilot plant testing of the pyrolyzer subsystem and the char combustion subsystem are being done separately, and then a pilot plant with integrated pyrolyzer and char combustion systems will be tested. In this report, progress in the pyrolyzer pilot plant preparation is reported. The results of extensive laboratory and bench scale testing of representative char are also reported. Preliminary results of combustion modeling of the char combustion system are included. There are also discussions of the auxiliary systems that are planned for the char combustion system pilot plant and the status of the integrated system pilot plant.

NONE

1996-11-01T23:59:59.000Z

322

Occurrence reporting and processing system (ORPS) lessons learned: Tools to improve workplace performance  

SciTech Connect

Various Department of Energy (DOE) orders require DOE and DOE contractor personnel to review abnormal events to gain lessons learned information. The term event'' is used to mean a real-time occurrence. When reviewing events data, it must be possible to determine what happened and why (including root causes), the impacts, the appropriate corrective actions, and any lessons learned that might be applicable to activities of other operations or contractors. Merely obtaining the information will not prevent occurrence of a similar event; contributing conditions must be corrected. It is important for managers, trainers, and others to learn from the events of others so that they may apply these experiences to their own activities. Reports of events must be analyzed to determine possible applicability to other facilities and/or job functions. Relevant information can then be used to correct defects and improve facilities and operations, thus making them more efficient and safer for all employees. Lessons learned information is particularly helpful in planning employee training and in developing training curriculum and programs. Lessons learned information can be obtained from many sources. It can be found in the Safety Performance Measurement System's Computerized Accident/Incident Reporting System (CAIRS) module, the S H Publications module, the Unusual Occurrence Reports module, and the Office of Nuclear Safety Operating Experience Weekly Summary.'' One important source of lessons teamed information is the Occurrence Reporting and Processing System (ORPS) database, which contains event data from September 1, 1990, to the present. This report discusses this source.

Commander, S.L.

1992-01-01T23:59:59.000Z

323

System And Method For Identifying, Reporting, And Evaluating Presence Of Substance  

SciTech Connect

A system and method for identifying, reporting, and evaluating a presence of a solid, liquid, gas, or other substance of interest, particularly a dangerous, hazardous, or otherwise threatening chemical, biological, or radioactive substance. The system comprises one or more substantially automated, location self-aware remote sensing units; a control unit; and one or more data processing and storage servers. Data is collected by the remote sensing units and transmitted to the control unit; the control unit generates and uploads a report incorporating the data to the servers; and thereafter the report is available for review by a hierarchy of responsive and evaluative authorities via a wide area network. The evaluative authorities include a group of relevant experts who may be widely or even globally distributed.

Smith, Maurice (Kansas City, MO); Lusby, Michael (Kansas City, MO); Hook, Arthur Van (Lake Lotawana, MO); Cook, Charles J. (Raytown, MO); Wenski, Edward G. (Lenexa, KS); Solyom, David (Overland Park, KS)

2005-09-20T23:59:59.000Z

324

Manual for Nuclear Materials Management and Safeguards System Reporting and Data Submission  

Directives, Delegations, and Requirements

The manual provides detailed instructions for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE M 474.1-2. Canceled by DOE M 470.4-6.

2003-08-19T23:59:59.000Z

325

Advanced turbine systems program conceptual design and product development. Annual report, August 1994--July 1995  

SciTech Connect

Objective of the ATS program is to develop ultra-high efficiency, environmentally superior, and cost-competitive gas turbine systems for base-load application in utility, independent power producer, and industrial markets. This report discusses the major accomplishments achieved during the second year of the ATS Phase 2 program, particularly the design and test of critical components.

NONE

1994-10-01T23:59:59.000Z

326

Preliminary design report for the K basins integrated water treatment system  

SciTech Connect

This Preliminary Design Report (PDR) provides a revised concept for the K Basins Integrated Water Treatment Systems (IWTS). This PDR incorporates the 11 recommendations made in a May 1996 Value Engineering session into the Conceptual Design, and provides new flow diagrams, hazard category assessment, cost estimate, and schedule for the IWTS Subproject.

Pauly, T.R., Westinghouse Hanford

1996-08-12T23:59:59.000Z

327

Ris Energy Report 4 International trends and scenarios for future energy systems Introduction  

E-Print Network (OSTI)

Risø Energy Report 4 International trends and scenarios for future energy systems 3 Introduction In evaluations of long term energy forecasts made in the past the conclusion often is that a large number on internationally recognised scientific material". One key observation in a recent evaluation of long term energy

328

Annual Report of the EURATOM/UKAEA Fusion Programme 2008/09 8 ITER Systems  

E-Print Network (OSTI)

optimise the plasma. These systems are based on many years experience built up in the fusion laboratories the responsibility of the new `Fusion for Energy' agency (F4E) in Barcelona. Our participation is mainly via F4E Partners at the end of this reporting period involves nuclear data production, and in particular

329

PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION  

SciTech Connect

This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

CONRAD EA

2008-08-12T23:59:59.000Z

330

Optimization of a Fixed Spraying System for Commercial High-Density Apple Plantings Final Report 2007  

E-Print Network (OSTI)

Optimization of a Fixed Spraying System for Commercial High-Density Apple Plantings Final Report and fruit coverage issues are a research priority in tree fruits and apples in particular. Preliminary Work. Preliminary trials were conducted in two blocks each of Red Delicious and Empire apples on M.9 dwarfing stock

Agnello, Arthur M.

331

Report  

NLE Websites -- All DOE Office Websites (Extended Search)

For Researchers For Researchers What You Need to Know and Do The Tech Transfer Process Business Development Services Berkeley Lab LaunchPad Funding - Innovation Grants Forms and Policies Conflict of Interest Outside Employment Export Control Record of Invention Software Disclosure and Abstract See Also FAQs for Researchers Entrepreneurial Resources Webcast: Transferring Technology to the Marketplace Pre-Publication Review Report Invention/Software The next step is for Lab researchers to report the invention or software to the Technology Transfer and Intellectual Property Management Department. The invention report is not a patent application and in and of itself secures no intellectual property rights. It is used by the Lab to make a decision as to whether to proceed with a patent application.

332

The Wide-area Energy Management System Phase 2 Final Report  

SciTech Connect

The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resulting system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.

Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

2010-08-31T23:59:59.000Z

333

Model documentation report: Transportation sector model of the National Energy Modeling System  

SciTech Connect

This report documents the objectives, analytical approach and development of the National Energy Modeling System (NEMS) Transportation Model (TRAN). The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated by the model. This document serves three purposes. First, it is a reference document providing a detailed description of TRAN for model analysts, users, and the public. Second, this report meets the legal requirements of the Energy Information Administration (EIA) to provide adequate documentation in support of its statistical and forecast reports (Public Law 93-275, 57(b)(1)). Third, it permits continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements.

Not Available

1994-03-01T23:59:59.000Z

334

Model documentation report: Commercial sector demand module of the national energy modeling system  

SciTech Connect

This report documents the objectives, analytical approach and development of the National Energy Modeling System (NEMS) Commercial Sector Demand Module. The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated through the synthesis and scenario development based on these components. This document serves three purposes. First, it is a reference document providing a detailed description for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its statistical and forecast reports. Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects.

NONE

1994-08-01T23:59:59.000Z

335

Model documentation report: Residential sector demand module of the National Energy Modeling System  

SciTech Connect

This report documents the objectives, analytical approach, and development of the National Energy Modeling System (NEMS) Residential Sector Demand Module. The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, and FORTRAN source code. This document serves three purposes. First, it is a reference document providing a detailed description for energy analysts, other users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its statistical and forecast reports according to Public Law 93-275, section 57(b)(1). Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements.

NONE

1995-03-01T23:59:59.000Z

336

Contractor-specific Documentation & Information in PARS II  

Energy.gov (U.S. Department of Energy (DOE))

DOE Office of Acquisition and Project Management established guidelines for documentation that should be available within PARS II through contractor-specific records that are not linked to any...

337

The L Prize PAR 38 Competition: A New Start  

Energy.gov (U.S. Department of Energy (DOE))

This March 27, 2012 webcast presented information on the newly reopened L Prize® PAR 38 competition. Moderated by James Brodrick, DOE Lighting Program Manager, the webcast featured an overview of...

338

Les maladies concernées, aujourd’hui, par la psychochirurgie  

Science Journals Connector (OSTI)

Les troubles obsessionnels compulsifs,avec par exemple leurs rituels de vérification ou de lavage, peuvent devenir extręmement invalidants, et dans 10 % des cas ne répondre ŕ aucune psychothérapie ni traitemen...

Marc Lévęque

2013-01-01T23:59:59.000Z

339

Energy Sources and Systems Analysis: 40 South Lincoln Redevelopment District (Full Report)  

SciTech Connect

This report presents the results of a case study to analyze district energy systems for their potential use in a project that involves redeveloping 270 units of existing public housing, along with other nearby sites. When complete, the redevelopment project will encompass more than 900 mixed-income residential units, commercial and retail properties, and open space. The analysis estimated the hourly heating, cooling, domestic hot water, and electric loads required by the community; investigated potential district system technologies to meet those needs; and researched available fuel sources to power such systems.

Not Available

2011-08-01T23:59:59.000Z

340

A Greenhouse-Gas Information System: Monitoring and Validating Emissions Reporting and Mitigation  

SciTech Connect

This study and report focus on attributes of a greenhouse-gas information system (GHGIS) needed to support MRV&V needs. These needs set the function of such a system apart from scientific/research monitoring of GHGs and carbon-cycle systems, and include (not exclusively): the need for a GHGIS that is operational, as required for decision-support; the need for a system that meets specifications derived from imposed requirements; the need for rigorous calibration, verification, and validation (CV&V) standards, processes, and records for all measurement and modeling/data-inversion data; the need to develop and adopt an uncertainty-quantification (UQ) regimen for all measurement and modeling data; and the requirement that GHGIS products can be subjected to third-party questioning and scientific scrutiny. This report examines and assesses presently available capabilities that could contribute to a future GHGIS. These capabilities include sensors and measurement technologies; data analysis and data uncertainty quantification (UQ) practices and methods; and model-based data-inversion practices, methods, and their associated UQ. The report further examines the need for traceable calibration, verification, and validation processes and attached metadata; differences between present science-/research-oriented needs and those that would be required for an operational GHGIS; the development, operation, and maintenance of a GHGIS missions-operations center (GMOC); and the complex systems engineering and integration that would be required to develop, operate, and evolve a future GHGIS.

Jonietz, Karl K. [Los Alamos National Laboratory; Dimotakis, Paul E. [JPL/CAL Tech; Rotman, Douglas A. [Lawrence Livermore National Laboratory; Walker, Bruce C. [Sandia National Laboratory

2011-09-26T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Refurbish power supply/distribution system Phase II. Progress status report No. 43, March 1, 1995--March 31, 1995  

SciTech Connect

This is a progress report detailing the schedules, accomplishments, and contract changes in the refurbishment of the Oak Ridge Y-12 plant power supply and distribution system.

NONE

1995-03-31T23:59:59.000Z

342

Report on New Pumping System Software on Pumping Instrumentation and Control Skids  

SciTech Connect

This report documents the details of the Programmable Logic Controller (PLC) and the Data Table Access Module (DTAM) logic developed for the new pumping system employed for saltwell pumping. The new system is planned first for pumping A-101 where Pumping Instrumentation and Control (PIC) skid ''F'' is located. The new pump requires a bump start under certain conditions that will be controlled by the PLC. The bump start is to ensure sufficient water to the pump bearing cavities. The PLC logic is required to control the shutdown of the injection pump that supplies the water to the saltwell pump bearing cavities. Allowance to start and stop the injection pump will be controlled by the PLC at the PIC skid. This report is written for PIC skid ''P'', but will apply to other PIC skids where the new pumping system is deployed. The logic will remain the same, but the ladder rung-numbers may change from skid to skid.

HORNER, T.M.

2001-04-19T23:59:59.000Z

343

,,"PARS II Interim Migration Template"  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

" " ,,"PARS II Interim Migration Template" ,,"Fields","Data" ,,"DOE Project ID:","DOE Project # and Project Name" ,,"Year:","Please select a Year" ,,"Month:","Please select a Month" ,,"Fields","Data (Entered in $K) [Data Entry field]" ,,"BCWS ($K):",0 ,,"BCWP ($K):",0 ,,"ACWP ($K):",0 ,,"Management Reserves Remaining ($K):",0 ,,"Percent Complete (%):",0 ,,"Instructions" ,,"1. Log into PARS II" ,,"2. Select the appropriate Project" ,,"3. While still on the Projects screen, click on ""Attachments""" ,,"4. Click on ""Add"""

344

MMOIRES ORIGINAUX Ionisation par le phosphore et phosphorescence  

E-Print Network (OSTI)

M�MOIRES ORIGINAUX Ionisation par le phosphore et phosphorescence Par Léon et Eugène BLOCH [Faculté phosphorescence avait hesoin d'être précisée. Si en effet la phosphorescence est duc à la combustion du phosphore, elle doit être plus vive dans l'oxygène quc dans l'air. Or dans l'oxygène pur, le phosphore cesse d

Boyer, Edmond

345

Article original Diffrenciation par le systme API 50 CH  

E-Print Network (OSTI)

Article original DiffĂ©renciation par le système API 50 CH et Ă©lectrophorèse des mycoplasmes Marcy-l'Ă?toile, France (Reçu le 15 janvier 1991; acceptĂ© le 11 juin 1991) RĂ©sumĂ© ― Le système API'aspect des colonies lors de l'isolement, ainsi que les rĂ©sultats fournis par le système API 50 CH ont permis

Paris-Sud XI, Université de

346

Final Report - Spent Nuclear Fuel Retrieval System Manipulator System Cold Validation Testing  

SciTech Connect

Manipulator system cold validation testing (CVT) was performed in support of the Fuel Retrieval System (FRS) Sub-Project, a subtask of the Spent Nuclear Fuel Project at the Hanford Site in Richland, Washington. The FRS will be used to retrieve and repackage K-Basin Spent Nuclear Fuel (SNF) currently stored in old K-Plant storage basins. The FRS is required to retrieve full fuel canisters from the basin; clean the fuel elements inside the canister to remove excessive uranium corrosion products (or sludge); remove the contents from the canisters; and sort the resulting debris, scrap, and fuel for repackaging. The fuel elements and scrap will be collected in fuel storage and scrap baskets in preparation for loading into a multi canister overpack (MCO), while the debris is loaded into a debris bin and disposed of as solid waste. The FRS is composed of three major subsystems. The Manipulator Subsystem provides remote handling of fuel, scrap, and debris; the In-Pool Equipment subsystem performs cleaning of fuel and provides a work surface for handling materials; and the Remote Viewing Subsystem provides for remote viewing of the work area by operators. There are two complete and identical FRS systems, one to be installed in the K-West basin and one to be installed in the K-East basin. Another partial system will be installed in a cold test facility to provide for operator training.

D.R. Jackson; G.R. Kiebel

1999-08-24T23:59:59.000Z

347

Solid-State Lighting: CALiPER Report 20.1: Subjective Evaluation of Beam  

NLE Websites -- All DOE Office Websites (Extended Search)

Report 20.1: Subjective Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps to someone by E-mail Share Solid-State Lighting: CALiPER Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps on Facebook Tweet about Solid-State Lighting: CALiPER Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps on Twitter Bookmark Solid-State Lighting: CALiPER Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps on Google Bookmark Solid-State Lighting: CALiPER Report 20.1: Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps on Delicious Rank Solid-State Lighting: CALiPER Report 20.1: Subjective

348

BOA: Asbestos pipe-insulation removal robot system, Phase 2. Topical report, January--June 1995  

SciTech Connect

This report explored the regulatory impact and cost-benefit of a robotic thermal asbestos pipe-insulation removal system over the current manual abatement work practice. The authors are currently in the second phase of a two-phase program to develop a robotic asbestos abatement system, comprised of a ground-based support system (including vacuum, fluid delivery, computing/electronics/power, and other subsystems) and several on-pipe removal units, each sized to handle pipes within a given diameter range. The intent of this study was to (i) aid in developing design and operational criteria for the overall system to maximize cost-efficiency, and (ii) to determine the commercial potential of a robotic pipe-insulation abatement system.

Schempf, H.; Bares, J.E.

1995-06-01T23:59:59.000Z

349

Solar energy system demonstration project at Wilmington Swim School, New Castle, Delaware. Final report  

SciTech Connect

This document is the Final Report of the Solar Energy System located at the Wilmington, Swim School, New Castle, Delaware. This active solar system is composed of 2,700 square feet of Revere liquid flat plate collectors piped to a 2,800 gallon concrete storage tank located below ground near the building. A micro-computer based control system selects the optimal applications of the stored energy among space, domestic water and pool alternatives. The controlled logic is planned for serving the heat loads in the following order: space heat-new addition, domestic water-entire facility, and pool heating-entire facility. A modified trombe wall passive operation the active system will bypass the areas being served passively. The system was designed for a 40 percent heating and a 30 percent hot water solar contribution.

None

1980-07-01T23:59:59.000Z

350

REPORT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT REPORT of the INFRASTRUCTURE TASK FORCE of the DOE NUCLEAR ENERGY RESEARCH ADVISORY COMMITTEE January 16, 2003 2 EXECUTIVE SUMMARY On October 1, 2002 the DOE Nuclear Energy Research Advisory Committee was asked to provide specific, focused updates to its Nuclear Science and Technology Infrastructure Roadmap and review the specific issues at the DOE key nuclear energy research and development (R&D) laboratories. This activity was assigned to a five-member Infrastructure Task Force (ITF). After receiving extensive written materials from DOE, the Idaho Nuclear Engineering and Environmental Laboratory (INEEL) and Argonne National Laboratory-West (ANL-W), on November 6-8, 2002 the ITF visited the Idaho site and received briefings and tours of the INEEL and ANL-W facilities. INEEL and

351

PARS II Process Document – DOE Period Close  

Energy.gov (U.S. Department of Energy (DOE))

This document details the process adopted by the Office of Acquisition and Project Management to prepare APM DepSec Monthly Status Report, finalize DOE close period package, and perform reporting...

352

Advanced turbine systems program conceptual design and product development. Quarterly report, August--October 1995  

SciTech Connect

This report describes the tasks completed for the advanced turbine systems program. The topics of the report include last row turbine blade development, single crystal blade casting development, ceramic materials development, combustion cylinder flow mapping, shroud film cooling, directional solidified valve development, shrouded blade cooling, closed-loop steam cooling, active tip clearance control, flow visualization tests, combustion noise investigation, TBC field testing, catalytic combustion development, optical diagnostics probe development, serpentine channel cooling tests, brush seal development, high efficiency compressor design, advanced air sealing development, advanced coating development, single crystal blade development, Ni-based disc forging development, and steam cooling effects on materials.

NONE

1996-01-01T23:59:59.000Z

353

Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1993  

SciTech Connect

This reports reports the progress/efforts performed on six technical projects: 1. systematic assessment of the state of hazardous waste clean-up technologies; 2. site remediation technologies (SRT):drain- enhanced soil flushing for organic contaminants removal; 3. SRT: in situ bio-remediation of organic contaminants; 4. excavation systems for hazardous waste sites: dust control methods for in-situ nuclear waste handling; 5. chemical destruction of polychlorinated biphenyls; and 6. development of organic sensors: monolayer and multilayer self-assembled films for chemical sensors.

Not Available

1993-04-01T23:59:59.000Z

354

Energy and complex industrial systems environmental emissions data reporting and acquisition  

SciTech Connect

The Joint International Atomic Energy Agency (IAEA), UNEP and WHO Project on Assessing and Managing Health and Environmental risks from Energy and Other Complex Technologies intends to complile emissions data for mportant energy systems and other complex technologies from a wide variety of countries. To facilitate data generation and compilation, this report: outlines data reporting protocols; identifies potential information sources; demonstrates how to estimate coefficients; presents some compiled US emission coefficients or criteria air pollutants for some energy process; and, compares national air emission standards for electricity generating plants in OECD member countries. 27 refs., 2 fis., 1 tabs.

Moskowitz, P.D.; Hamilton, L.D.

1987-07-01T23:59:59.000Z

355

Hanford ETR Bulk Vitrification System - Demonstration Bulk Vitrification System (DBVS) Review Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Comprehensive Technical A Comprehensive Technical Review of the Demonstration Bulk Vitrification System Technical Assessment Conducted by an Independent and External Team of Experts Volume 1 September 28, 2006 Chartered by CH2M HILL Hanford Group, Inc. Richland, Washington 99352 RPP-31314 Executive Summary In May 2006, CH2M HILL Hanford Group, Inc. chartered an Expert Review Panel (ERP) to review the current status of the Demonstration Bulk Vitrification System (DBVS). It is the consensus of the ERP that bulk vitrification is a technology that requires further development and evaluation to determine its potential for meeting the Hanford waste stabilization mission. No fatal flaws (issues that would jeopardize the overall DBVS mission that cannot be mitigated) were found, given the current state of the project.

356

Quantitative Modeling and Estimation in Systems Biology using Fluorescent Reporter Systems  

E-Print Network (OSTI)

) Fluorescence intensity profile obtained for IL-6-STAT3 system ............. 45 9. Estimated STAT3 profiles from Tikhonov regularization and truncated SVD ........ 47 10. Illustration for choosing the excitation wavelength for a mixture containing CFP and GFP... (data obtained from an online database (Biosciences, 2000) for CFP and GFP variants that have maximum emission and excitation wavelengths reasonably close to pAmCyan and pCM18 protein plasmids, respectively...

Bansal, Loveleena

2013-12-10T23:59:59.000Z

357

Advanced turbine systems study system scoping and feasibility study. Final report  

SciTech Connect

United Technologies Research Center, Pratt & Whitney Commercial Engine Business, And Pratt & Whitney Government Engine and Space Propulsion has performed a preliminary analysis of an Advanced Turbine System (ATS) under Contract DE-AC21-92MC29247 with the Morgantown Energy Technology Center. The natural gas-fired reference system identified by the UTC team is the Humid Air Turbine (HAT) Cycle in which the gas turbine exhaust heat and heat rejected from the intercooler is used in a saturator to humidify the high pressure compressor discharge air. This results in a significant increase in flow through the turbine at no increase in compressor power. Using technology based on the PW FT4000, the industrial engine derivative of the PW4000, currently under development by PW, the system would have an output of approximately 209 MW and an efficiency of 55.3%. Through use of advanced cooling and materials technologies similar to those currently in the newest generation military aircraft engines, a growth version of this engine could attain approximately 295 MW output at an efficiency of 61.5%. There is the potential for even higher performance in the future as technology from aerospace R&D programs is adapted to aero-derivative industrial engines.

Not Available

1993-04-01T23:59:59.000Z

358

Model documentation report: Industrial sector demand module of the National Energy Modeling System  

SciTech Connect

This report documents the objectives, analytical approach, and development of the National Energy Modeling System (NEMS) Industrial Demand Model. The report catalogues and describes model assumptions, computational methodology, parameter estimation techniques, and model source code. This document serves three purposes. First, it is a reference document providing a detailed description of the NEMS Industrial Model for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its models. Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects. The NEMS Industrial Demand Model is a dynamic accounting model, bringing together the disparate industries and uses of energy in those industries, and putting them together in an understandable and cohesive framework. The Industrial Model generates mid-term (up to the year 2015) forecasts of industrial sector energy demand as a component of the NEMS integrated forecasting system. From the NEMS system, the Industrial Model receives fuel prices, employment data, and the value of industrial output. Based on the values of these variables, the Industrial Model passes back to the NEMS system estimates of consumption by fuel types.

NONE

1997-01-01T23:59:59.000Z

359

A greenhouse-gas information system monitoring and validating emissions reporting and mitigation  

SciTech Connect

Current GHG-mitigating regimes, whether internationally agreed or self-imposed, rely on the aggregation of self-reported data, with limited checks for consistency and accuracy, for monitoring. As nations commit to more stringent GHG emissions-mitigation actions and as economic rewards or penalties are attached to emission levels, self-reported data will require independent confirmation that they are accurate and reliable, if they are to provide the basis for critical choices and actions that may be required. Supporting emissions-mitigation efforts and agreements, as well as monitoring energy- and fossil-fuel intensive national and global activities would be best achieved by a process of: (1) monitoring of emissions and emission-mitigation actions, based, in part, on, (2) (self-) reporting of pertinent bottom-up inventory data, (3) verification that reported data derive from and are consistent with agreed-upon processes and procedures, and (4) validation that reported emissions and emissions-mitigation action data are correct, based on independent measurements (top-down) derived from a suite of sensors in space, air, land, and, possibly, sea, used to deduce and attribute anthropogenic emissions. These data would be assessed and used to deduce and attribute measured GHG concentrations to anthropogenic emissions, attributed geographically and, to the extent possible, by economic sector. The validation element is needed to provide independent assurance that emissions are in accord with reported values, and should be considered as an important addition to the accepted MRV process, leading to a MRV&V process. This study and report focus on attributes of a greenhouse-gas information system (GHGIS) needed to support MRV&V needs. These needs set the function of such a system apart from scientific/research monitoring of GHGs and carbon-cycle systems, and include (not exclusively): the need for a GHGIS that is operational, as required for decision-support; the need for a system that meets specifications derived from imposed requirements; the need for rigorous calibration, verification, and validation (CV&V) standards, processes, and records for all measurement and modeling/data-inversion data; the need to develop and adopt an uncertainty-quantification (UQ) regimen for all measurement and modeling data; and the requirement that GHGIS products can be subjected to third-party questioning and scientific scrutiny. This report examines and assesses presently available capabilities that could contribute to a future GHGIS. These capabilities include sensors and measurement technologies; data analysis and data uncertainty quantification (UQ) practices and methods; and model-based data-inversion practices, methods, and their associated UQ. The report further examines the need for traceable calibration, verification, and validation processes and attached metadata; differences between present science-/research-oriented needs and those that would be required for an operational GHGIS; the development, operation, and maintenance of a GHGIS missions-operations center (GMOC); and the complex systems engineering and integration that would be required to develop, operate, and evolve a future GHGIS. Present monitoring systems would be heavily relied on in any GHGIS implementation at the outset and would likely continue to provide valuable future contributions to GHGIS. However, present monitoring systems were developed to serve science/research purposes. This study concludes that no component or capability presently available is at the level of technological maturity and readiness required for implementation in an operational GHGIS today. However, purpose-designed and -built components could be developed and implemented in support of a future GHGIS. The study concludes that it is possible to develop and provide a capability-driven prototype GHGIS, as part of a Phase-1 effort, within three years from project-funding start, that would make use of and integrate existing sensing and system capabilities. As part of a Phase-2 effort, a requirem

Jonietz, Karl K [Los Alamos National Laboratory; Dimotakis, Paul E [JPL/CAL TECH; Roman, Douglas A [LLNL; Walker, Bruce C [SNL

2011-09-26T23:59:59.000Z

360

Analytical selection of marketable SAHP systems. Final report, September 30, 1977-December 31, 1979  

SciTech Connect

For the effective marketing of energy conserving heating systems which have high initial costs, such as the solar assisted heat pump (SAHP), it is imperative to identify those climatic regions, load profiles, and system characteristics for which such systems are economically promising. This report summarizes efforts to develop a quick and efficient means of performing this identification. These efforts were separated into two distinct studies, a marketing study and a technical study of five energy conserving systems; and stand-alone heat pump, a stand-alone solar energy system, and a series, a parallel, and a dual source SAHP system. One of the primary results of the marketing study was the identification of the portion of the HVAC market into which the initial marketing thrust of these systems should be concentrated. In addition, several factors which influence the sales of these systems were identified. The technical study concentrated on the development and use of an analytical model of each of the systems. This model was designed to quickly size, in a specific climatic region, the system components for an economic optimum; i.e., for a minimum life cycle cost. Then the one energy conserving system which has the lowest life cycle cost, and thus the best potential, can be identified. It was found that, at present costs of electricity, the air-to-air heat pump has the lowest life cycle cost and hence is considered most marketable. At significantly higher electricity costs, the series SAHP system is the most marketable one because it has the lowest life cycle cost of the five energy conserving systems studied.

Kahan, W.

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Advanced Turbine System (ATS): Task 1, System scoping and feasibility study. Final report  

SciTech Connect

Present GT(Gas Turbine) Systems are available to achieve 52% (LHV) thermal efficiencies, plants in construction will be capable of 54%, and the goal of this study is to identify incentives, technical issues, and resource requirements to develop natural gas-and coal-compatible ATS which would have a goal of 60% or greater based on LHV. The prime objective of this project task is to select a natural gas-fired ATS (Advanced Turbine System) that could be manufactured and marketed should development costs not be at issue with the goals of: (1) Coal of electricity 10% below 1991 vintage power plants in same market class and size. (2) Expected performance 60% efficiency and higher, (3) Emission levels, NO{sub x} < 10 ppM (0.15 lb/MW-h), CO < 20 ppM (0.30 lb/MW-h), and UHC < 20 ppM (0.30 lb/MW-h). ABB screening studies have identified the gas-fueled combined cycle as the most promising full scale solution to achieve the set goals for 1988--2002. This conclusion is based on ABB`s experience level, as well as the multi-step potential of the combined cycle process to improve in many component without introducing radical changes that might increase costs and lower RAM. The technical approach to achieve 60% or better thermal efficiency will include increased turbine inlet temperatures, compressor intercooling, as well a improvements in material, turbine cooling technology and the steam turbine. Use of improved component efficiencies will achieve gas-fired cycle performance of 61.78%. Conversion to coal-firing will result in system performance of 52.17%.

van der Linden, S.

1993-02-01T23:59:59.000Z

362

Laser sampling system for an inductively-coupled atomic emission spectrometer. Final report  

SciTech Connect

A laser sampling system was attached to a Perkin Elmer Optima 3000 inductively-coupled plasma, atomic emission spectrometer that was already installed and operating in the Chemistry and Geochemistry Department at the Colorado School of Mines. The use of the spectrometer has been highly successful. Graduate students and faculty from at least four different departments across the CSM campus have used the instrument. The final report to NSF is appended to this final report. Appendices are included which summarize several projects utilizing this instrument: acquisition of an inductively-coupled plasma atomic emission spectrometer for the geochemistry program; hydrogen damage susceptibility assessment for high strength steel weldments through advanced hydrogen content analysis, 1996 and 1997 annual reports; and methods for determination of hydrogen distribution in high strength steel welds.

NONE

1998-02-15T23:59:59.000Z

363

Advanced turbine systems program conceptual design and product development. Quarterly report, February 1995--April 1995  

SciTech Connect

This Quarterly Technical Progress Report covers the period February 1, 1995, through April 30, 1995, for Phase II of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE contract No. DE-AC21-93MC30246. The objective of Phase II of the ATS Program is to provide the conceptual design and product development plan for an ultra high efficiency, environmentally superior and cost competitive industrial gas turbine system to be commercialized by the year 2000. A secondary objective is to begin early development of technologies critical to the success of ATS. Tasks 1, 2, 3, 5, 6 and 7 of Phase II have been completed in prior quarters. Their results have been discussed in the applicable quarterly reports and in their respective topical reports. With the exception of Task 7, final editions of these topical reports have been submitted to the DOE. This quarterly report, then, addresses only Task 4 and the nine subtasks included in Task 8, {open_quotes}Design and Test of Critical Components.{close_quotes} These nine subtasks address six ATS technologies as follows: (1) Catalytic Combustion - Subtasks 8.2 and 8.5, (2) Recuperator - Subtasks 8.1 and 8.7, (3) Autothermal Fuel Reformer - Subtask 8.3, (4) High Temperature Turbine Disc - Subtask 8.4, (5) Advanced Control System (MMI) - Subtask 8.6, and (6) Ceramic Materials - Subtasks 8.8 and 8.9. Major technological achievements from Task 8 efforts during the quarter are as follows: (1) The subscale catalytic combustion rig in Subtask 8.2 is operating consistently at 3 ppmv of NO{sub x} over a range of ATS operating conditions. (2) The spray cast process used to produce the rim section of the high temperature turbine disc of Subtask 8.4 offers additional and unplanned spin-off opportunities for low cost manufacture of certain gas turbine parts.

Karstensen, K.W.

1995-07-01T23:59:59.000Z

364

Fuel cell power systems for remote applications. Phase 1 final report and business plan  

SciTech Connect

The goal of the Fuel Cell Power Systems for Remote Applications project is to commercialize a 0.1--5 kW integrated fuel cell power system (FCPS). The project targets high value niche markets, including natural gas and oil pipelines, off-grid homes, yachts, telecommunication stations and recreational vehicles. Phase 1 includes the market research, technical and financial analysis of the fuel cell power system, technical and financial requirements to establish manufacturing capability, the business plan, and teaming arrangements. Phase 1 also includes project planning, scope of work, and budgets for Phases 2--4. The project is a cooperative effort of Teledyne Brown Engineering--Energy Systems, Schatz Energy Research Center, Hydrogen Burner Technology, and the City of Palm Desert. Phases 2 through 4 are designed to utilize the results of Phase 1, to further the commercial potential of the fuel cell power system. Phase 2 focuses on research and development of the reformer and fuel cell and is divided into three related, but potentially separate tasks. Budgets and timelines for Phase 2 can be found in section 4 of this report. Phase 2 includes: Task A--Develop a reformate tolerant fuel cell stack and 5 kW reformer; Task B--Assemble and deliver a fuel cell that operates on pure hydrogen to the University of Alaska or another site in Alaska; Task C--Provide support and training to the University of Alaska in the setting up and operating a fuel cell test lab. The Phase 1 research examined the market for power systems for off-grid homes, yachts, telecommunication stations and recreational vehicles. Also included in this report are summaries of the previously conducted market reports that examined power needs for remote locations along natural gas and oil pipelines. A list of highlights from the research can be found in the executive summary of the business plan.

NONE

1998-02-01T23:59:59.000Z

365

RPSEA Phase 2 Final Report: MSDC Electrical System for Deepwater Subsea Process  

NLE Websites -- All DOE Office Websites (Extended Search)

RPSEA RPSEA Phase 2 Final Report: MSDC Electrical System for Deepwater Subsea Process 08121.2901.01.FINAL Deep Water Electrical Power Distribution System and Power Components 08121-2901-01 November 19, 2013 Rixin Lai Senior Electrical Engineer General Electric Global Research One Research Circle, Niskayuna, NY 12309 LEGAL NOTICE This report was prepared by General Electric Global Research as an account of work sponsored by the Research Partnership to Secure Energy for America, RPSEA. Neither RPSEA members of RPSEA, the National Energy Technology Laboratory, the U.S. Department of Energy, nor any person acting on behalf of any of the entities: MAKES ANY WARRANTY OR REPRESENTATION, EXPRESS OR IMPLIED WITH RESPECT TO ACCURACY, COMPLETENESS, OR USEFULNESS OF THE INFORMATION

366

Innovative coke oven gas cleaning system for retrofit applications. Environmental Monitoring program. Volume 1 - sampling progrom report. Baseline Sampling Program report  

SciTech Connect

Bethlehem Steel Corporation (BSC), in conjunction with the Department of Energy (DOE) is conducting a Clean Coal Technology (CCT) project at its Sparrows Point, Maryland Coke Oven Plant. This innovative coke oven gas cleaning system combines several existing technologies into an integrated system for removing impurities from Coke Oven Gas (COG) to make it an acceptable fuel. DOE provided cost-sharing under a Cooperative Agreement with BSC. This Cooperative Agreement requires BSC to develop and conduct and Environmental Monitoring Plan for the Clean Coal Technology project and to report the status of the EMP on a quarterly basis. It also requires the preparation of a final report on the results of the Baseline Compliance and Supplemental Sampling Programs that are part of the EMP and which were conducted prior to the startup of the innovative coke oven gas cleaning system. This report is the Baseline Sampling Program report.

Stuart, L.M.

1994-05-27T23:59:59.000Z

367

In situ permeability modification using gelled polymer systems. Topical report, June 10, 1996--April 10, 1997  

SciTech Connect

Results from a research program on the application of gelled polymer technology for in situ permeability modification are presented in this report. The objective of this technology when used with displacement processes such as waterflooding is to reduce the permeability in fractures and/or high permeability matrix zones to improve volumetric sweep efficiency of the displacement process. In production wells, the objective is to reduce water influx. The research program is focused on five areas: gel treatment in fractured systems; gel treatment in carbonate rocks; in-depth placement of gels; gel systems for application in carbon dioxide flooding; and gel treatment in production wells. The research program is primarily an experimental program directed at improving the understanding of gelled polymer systems and how these systems can be used to increase oil recovery from petroleum reservoirs. A summary of progress for research conducted in the first 10 months of a 28 month program is described in the following sections.

Green, D.W.; Willhite, G.P.; McCool, C.S.; Heppert, J.A.; Vossoughi, S.

1997-10-01T23:59:59.000Z

368

In situ permeability modification using gelled polymer systems. Annual report, April 11, 1997--April 10, 1998  

SciTech Connect

Results from a research program on the application of gelled polymer technology for in situ permeability modification are presented in this report. The objective of this technology when used with displacement processes such as waterflooding is to reduce the permeability in fractures and/or high permeability matrix zones to improve volumetric sweep efficiency of the displacement process. In production wells, the objective is to reduce water influx. The research program focused on five areas: Gel treatment in fractured systems; Gel treatment in carbonate rocks; In-depth placement of gels; Gel systems for application in carbon dioxide flooding; and Gel treatment in production wells. The research program is primarily an experimental program directed toward improving the understanding of gelled polymer systems and how these systems can be used to increase oil recovery from petroleum reservoirs. A summary of progress for research conducted in the second 12 month period of a 28 month program is described.

Green, D.W.; Willhite, G.P.; McCool, C.S.; Heppert, J.A.; Vossoughi, S.; Michnick, M.J.

1998-09-01T23:59:59.000Z

369

TITLE III EVALUATION REPORT FOR THE SURFACE AND SUBSURFACE POWER SYSTEM  

SciTech Connect

The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the alternate constructed power system. Recommendations for resolving discrepancies between the alternate constructed power system, the technical baseline requirements, and the baseline design are included in this report. Cost and schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guidelines. These recommendations are intended to improve and enhance the operation and maintenance of the facility. This Title III Evaluation Report (TER) does not include evaluation of surface electrical construction support facilities used to provide temporary construction power where the intent to remove such facilities when construction is completed such as tent storage buildings, shop buildings, fuel storage area etc. Furthermore, this TER does not include the extension of the existing overhead power lines to the booster pump station that was designed, installed, and is maintained by Nevada Test Site (NTS).

W.J. REED

1999-08-16T23:59:59.000Z

370

Model documentation report: Commercial Sector Demand Module of the National Energy Modeling System  

SciTech Connect

This report documents the objectives, analytical approach and development of the National Energy Modeling System (NEMS) Commercial Sector Demand Module. The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated through the synthesis and scenario development based on these components. The NEMS Commercial Sector Demand Module is a simulation tool based upon economic and engineering relationships that models commercial sector energy demands at the nine Census Division level of detail for eleven distinct categories of commercial buildings. Commercial equipment selections are performed for the major fuels of electricity, natural gas, and distillate fuel, for the major services of space heating, space cooling, water heating, ventilation, cooking, refrigeration, and lighting. The algorithm also models demand for the minor fuels of residual oil, liquefied petroleum gas, steam coal, motor gasoline, and kerosene, the renewable fuel sources of wood and municipal solid waste, and the minor services of office equipment. Section 2 of this report discusses the purpose of the model, detailing its objectives, primary input and output quantities, and the relationship of the Commercial Module to the other modules of the NEMS system. Section 3 of the report describes the rationale behind the model design, providing insights into further assumptions utilized in the model development process to this point. Section 3 also reviews alternative commercial sector modeling methodologies drawn from existing literature, providing a comparison to the chosen approach. Section 4 details the model structure, using graphics and text to illustrate model flows and key computations.

NONE

1998-01-01T23:59:59.000Z

371

University of Hawaii Advisory Task Group -Operational Assessment Report on System Level Administration Operating Policies and Practices  

E-Print Network (OSTI)

#12;University of Hawaii ­ Advisory Task Group - Operational Assessment Report on System Level on System Level Administration Operating Policies and Practices page 2 B. Ensure clear lines of authority an Operational Assessment at the System Level of the University. For purposes of this assessment, "System Level

372

Audit Report - Naval Reactors Information Technology System Development Efforts, IG-0879  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Naval Reactors Information Naval Reactors Information Technology System Development Efforts DOE/IG-0879 December 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 December 21, 2012 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on the "Naval Reactors Information Technology System Development Efforts" INTRODUCTION AND OBJECTIVE The Naval Reactors Program (Naval Reactors), an organization within the National Nuclear Security Administration, was established to provide the military with safe and reliable nuclear propulsion plants to power warships and submarines. Naval Reactors maintains responsibility

373

Resource Allocation Support System (RASS): Summary report of the 1992 pilot study  

SciTech Connect

The Resource Allocation Support System (RASS) is a decision-aiding system being developed to assist the US Department of Energy`s (DOE`s) Office of Waste Management in program and budget decision making. Four pilot studies were conducted at DOE field offices in summer 1992 to evaluate and improve the RASS design. This report summarizes the combined results of the individual field office pilot studies. Results are presented from different perspectives to illustrate the type of information that would be available from RASS. Lessons learned and directions for future RASS developments are also presented.

Buehring, W.A.; Whitfield, R.G.; Wolsko, T.D.; Kier, P.H.; Absil, M.J.G.; Jusko, M.J.; Sapinski, P.F.

1993-02-01T23:59:59.000Z

374

Review of the integrated thermal and nonthermal treatment system studies. Final report  

SciTech Connect

This report contains a review and evaluation of three systems analysis studies performed by LITCO on integrated thermal treatment systems and integrated nonthermal treatment systems for the remediation of mixed low-level waste stored throughout the US Department of Energy weapons complex. The review was performed by an independent team of nine researchers from the Energy and Environmental Research Center, Science Applications International Corporation, the Waste Policy Institute, and Virginia Tech. The three studies reviewed were as follows: Integrated Thermal Treatment System Study, Phase 1 -- issued July 1994; Integrated Thermal Treatment System Study, Phase 2 -- issued February 1996; and Integrated Nonthermal Treatment System Study -- drafted March 1996. The purpose of this review was to (1) determine whether the assumptions of the studies were adequate to produce an unbiased review of both thermal and nonthermal systems, (2) to identify the critical areas of the studies that would benefit from further investigation, and (3) to develop a standard template that could be used in future studies to assure a sound application of systems engineering.

NONE

1996-10-01T23:59:59.000Z

375

Facility Energy Decision System (FEDS) Assessment Report for US Army Garrison, Japan - Honshu Installations  

SciTech Connect

This report documents an assessment was performed by a team of engineers from Pacific Northwest National Laboratory (PNNL) under contract to the Installation Management Command (IMCOM) Pacific Region Office (PARO). The effort used the Facility Energy Decision System (FEDS) model to determine how energy is consumed at five U.S. Army Garrison-Japan (USAG-J) installations in the Honshu area, identify the most cost-effective energy retrofit measures, and calculate the potential energy and cost savings.

Kora, Angela R.; Brown, Daryl R.; Dixon, Douglas R.

2010-03-09T23:59:59.000Z

376

Safety analysis report for packaging, onsite, long-length contaminated equipment transport system  

SciTech Connect

This safety analysis report for packaging describes the components of the long-length contaminated equipment (LLCE) transport system (TS) and provides the analyses, evaluations, and associated operational controls necessary for the safe use of the LLCE TS on the Hanford Site. The LLCE TS will provide a standardized, comprehensive approach for the disposal of approximately 98% of LLCE scheduled to be removed from the 200 Area waste tanks.

McCormick, W.A.

1997-05-09T23:59:59.000Z

377

Development of a Foam OTEC System. Final technical report for Fiscal Year 1979  

SciTech Connect

Research on Development of a Foam OTEC System, as carried out at Carnegie-Mellon University from October 1, 1978 through September 30, 1979, is described. To a brief section summarizing highlights of research results are appended 12 technical reports which detail specific sections of the program. The work described is continuing and a proposal is currently being submitted to provide support in fiscal 1980.

Not Available

1980-01-01T23:59:59.000Z

378

Brayton-cycle heat recovery-system characterization program. Subatmospheric-system test report  

SciTech Connect

The turbine tests and results for the Brayton cycle subatmospheric system (SAS) are summarized. A scaled model turbine was operated in the same environment as that which a full-scale SAS machine would experience from the hot effluent flue gas from a glass container furnace. The objective of the testing was to evaluate the effects of a simulated furnace flue gas stream on the turbine nozzles and blades. The following specific areas were evaluated: erosion of the turbine nozzles and blades from the dust in the flue gas, hot corrosion from alkali metal salts in the dust and acid vapor (sulfur trioxide and hydrogen chloride) in the flue gas, and fouling and flow blockage due to deposition and/or condensation from the flue gas constituents.

Burgmeier, L.; Leung, S.

1981-07-31T23:59:59.000Z

379

THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests  

SciTech Connect

This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be shared between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.

Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.; Rudolph, Frank; Murthy, Shashikala; Arseneaux, Jim; Loutan, Clyde; Chowdhury, S.

2010-08-31T23:59:59.000Z

380

A Study to Determine the Biological Feasibility of a New Fish Tagging System : Annual Report 1990-1993.  

SciTech Connect

In 1983, the National Marine Fisheries Service (NMFS) began a multiyear cooperative research program with the Bonneville Power Administration (BPA) to evaluate a new miniaturized identification system that could be used with salmonids. The system is referred to as the passive-integrated-transponder (PIT) tagging and interrogation system. The program has focused on determining the effects of PIT tags on juvenile and adult salmonids, as well as the development and evaluation of tagging and interrogation methods. Earlier results of the program have been reported in annual reports and journal articles cited in this report. This report covers the work per formed from 1990 through 1993. For convenience, the report is divided into three sections: (1) Interrogation and separation systems at Columbia River Basin dams; (2) Systems development and evaluation; and (3) Information and technology transfer.

Prentice, Earl F.; Maynard, D.J.; Downing, S.L. (and others)

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Reports  

Office of Legacy Management (LM)

Reports Reports . . . . , Book -1. Service Open File Information for Project Rulison, Production Testing Phase, . , August 28,1970 : . "; DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document. DESCRIPTION O F PU1:T41C I-l!lkI,T;-1 SE1:VICh: 0P:SN F I L E INPOPt4ATION i[ ' 7 S&u-~%uestcrn E a d i o l o g i c a l H e a l t h 1,aboratol-p r? U. S. Depaieraent o f I l e a l t h ,. E d u c a t i o n aud Welfa,re i i I t - - . L-J~ub-l-ic H e a l t h ' ~ c r v i c e : Y T h i s s u r v e i l l a ~ l c e p e r f o r m e d u n d e r r e , a Memorandum o f ~ n d e k s t a n d i n ~ (No. SF 5 1 & L A U. S . . A t o m i c E n e r g y Commission i hk, ! i ilYo.,jh,asic g r o u p s o f i n f o r m a t i o n a r e p l a c e d i n t h e P u b l i c H e a l t h i k e l ~ e r v i k e , \ ~ o u t h w e s t c r n R a t i i o l o g i c a l H

382

Advanced turbine systems program conceptual design and product development. Annual report, August 1994--July 1995  

SciTech Connect

This report summarizes the tasks completed under this project during the period from August 1, 1994 through July 31, 1994. The objective of the study is to provide the conceptual design and product development plan for an ultra high efficiency, environmentally superior and cost-competitive industrial gas turbine system to be commercialized by the year 2000. The tasks completed include a market study for the advanced turbine system; definition of an optimized recuperated gas turbine as the prime mover meeting the requirements of the market study and whose characteristics were, in turn, used for forecasting the total advanced turbine system (ATS) future demand; development of a program plan for bringing the ATS to a state of readiness for field test; and demonstration of the primary surface recuperator ability to provide the high thermal effectiveness and low pressure loss required to support the proposed ATS cycle.

NONE

1995-11-01T23:59:59.000Z

383

Chemical/hydrogen energy storage systems. Annual report, January 1, 1979-December 31, 1979  

SciTech Connect

The progress made in 1979 in the Chemical/Hydrogen Energy Storage Systems Program is described. The program is managed by Brookhaven National Laboratory for the Division of Energy Storage Systems of the Department of Energy. The program consists of research and development activities in the areas of Hydrogen Production, Storage and Materials, End-Use Applications/Systems Studies, and in Chemical Heat Pumps. The report outlines the progress made by key industrial contractors such as General Electric in the development of SPE water electrolyzers; INCO in the studies of surface poisoning (and reactivation) of metal hydrides; and Air Products and Chemicals in the evaluation of hydrogen production at small hydropower sites. The BNL in-house supporting research, as well as that at universities and other national laboratories for which BNL has technical oversight, is also described.

Not Available

1980-05-01T23:59:59.000Z

384

Organic geochemistry of Gadvan and Kazhdumi formations (Cretaceous) in South Pars field, Persian Gulf, Iran  

Science Journals Connector (OSTI)

In Southern Iran, Gadvan (Barremian-early Aptian) and Kazhdumi (Albian) formations are the most effective source rocks and have produced the majority of hydrocarbons reserved in the Zagros Basin especially in Dezful Embayment and Persian Gulf area. In this article, hydrocarbon potential of Gadvan and Kazhdumi formations is investigated in the South Pars field which is southern extension of the North field of Qatar Country. This field is located in Persian Gulf waters and is actually the northern extension of Qatar Arc Paleohigh where geological history of Gadvan and Kazhdumi formations is different from nearby area regarding depositional setting, burial history and source rock maturity. In this study, Gadvan and Kazhdumi formations as source rock candidates, which underlay Upper Dariyan and Mauddud members, respectively, were sampled in two drilled wells of the South Pars field for routine geochemical analysis to investigate hydrocarbon potential of these formations and source rock identification of trapped oil in the Upper Dariyan and Mauddud members. Several samples from top to the bottom of the formations were taken and analyzed by Rock-Eval pyrolysis. The average TOC content of Gadvan and Kazhdumi formations is 0.79 wt. % and 0.49 wt. %, respectively. Rock-Eval results (e.g. HI vs. Tmax) represent that TOC content of these formations contains type II-III kerogens which haven't suffered sufficient thermal maturity (Ro < 0.5%) in this study area. Moreover calculated S2/S3 ratio implies that these formations in central part of Qatar Arc, South Pars field couldn't produce noticeable liquid hydrocarbon. As it is believed, Gadvan and Kazhdumi formations to be source of trapped oil in the system, therefore, in the South Pars field reserved hydrocarbon in Upper Dariyan (Aptian) and Mauddud (late Albian) members which overlie Gadvan and Kazhdumi formations, respectively, are probably generated from Gadvan and Kazhdumi formations of the nearby through and flanks of the Qatar Arc where the burial depth and temperature increase then generated hydrocarbons in downdip area are migrated to the upper carbonate reservoirs in the crest part of the Qatar Arc. Long path migration of the hydrocarbon and source rock with lower organic matter are caused hydrocarbon accumulation in the South Pars Oil Layer (Al-Shaheen) which is approved by professional petrophysical and geological studies of the field.

Omeid Rahmani; Jafar Aali; Hassan Mohseni; Hossein Rahimpour-Bonab; Seddighe Zalaghaie

2010-01-01T23:59:59.000Z

385

Advanced turbine systems program -- Conceptual design and product development. Final report  

SciTech Connect

This Final Technical Report presents the accomplishments on Phase 2 of the Advanced Turbine Systems (ATS). The ATS is an advanced, natural gas fired gas turbine system that will represent a major advance on currently available industrial gas turbines in the size range of 1--20 MW. This report covers a market-driven development. The Market Survey reported in Section 5 identified the customer`s performance needs. This market survey used analyses performed by Solar turbine Incorporated backed up by the analyses done by two consultants, Research Decision Consultants (RDC) and Onsite Energy Corporation (Onsite). This back-up was important because it is the belief of all parties that growth of the ATS will depend both on continued participation in Solar`s traditional oil and gas market but to a major extent on a new market. This new market is distributed electrical power generation. Difficult decisions have had to be made to meet the different demands of the two markets. Available resources, reasonable development schedules, avoidance of schedule or technology failures, probable acceptance by the marketplace, plus product cost, performance and environmental friendliness are a few of the complex factors influencing the selection of the Gas Fired Advanced Turbine System described in Section 3. Section 4 entitled ``Conversion to Coal`` was a task which addresses the possibility of a future interruption to an economic supply of natural gas. System definition and analysis is covered in Section 6. Two major objectives were met by this work. The first was identification of those critical technologies that can support overall attainment of the program goals. Separate technology or component programs were begun to identify and parameterize these technologies and are described in Section 7. The second objective was to prepare parametric analyses to assess performance sensitivity to operating variables and to select design approaches to meet the overall program goals.

NONE

1996-07-26T23:59:59.000Z

386

Study of the impacts of regulations affecting the acceptance of integrated community energy systems. Final report  

SciTech Connect

A detailed description is presented of the laws and programs of the State of North Carolina governing the regulation of public energy utilities, the siting of energy generating and transmission facilities, the municipal franchising of public energy utilities, and the prescription of rates to be charged by utilities including attendant problems of cost allocations, rate base and operating expense determinations, and rate of return allowances. These laws and programs are analyzed to identify impediments which they may present to the implementation of Integrated Community Energy Systems (ICES). This report is one of fifty-one separate volumes which describe such regulatory programs at the Federal level and in each state as background to the report entitled Community Energy Systems and the Law of Public Utilities - Volume One: An Overview. This report also contains a summary of a strategy described in Volume One - An Overview for overcoming these impediments by working within the existing regulatory framework and by making changes in the regulatory programs to enhance the likelihood of ICES implementation.

Not Available

1981-01-01T23:59:59.000Z

387

Proposed Data Elements for PARS II Web Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Data Elements for PARS II Data Elements for PARS II Revised: July 27, 2009 - Version 5.1 This document should be printed on legal size paper, in landscape mode. 1.0 Overview The PARS II application will collect two major types of data from DOE Field Site and DOE Headquarters locations. The two types of data are called: (1) Oversight and Assessment Data and (2) Contractor Project Performance Data and are designed to provide information to support for the concepts and data elements represented by the DOE EVMS Gold Card 1 . A reproduction the relevant section of the Gold Card appears to the right. Performance Baseline (TPC) CBB + Profit Fee Non Contract Costs (Includes DOE Direct Costs) Contingency (DOE Held) Performance Measurement Baseline (PMB) Profit Fee (Contractor) Management

388

Software Verification & Validation Report for the 244-AR Vault Interim Stabilization Ventilation System  

SciTech Connect

This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent.

YEH, T.

2002-11-20T23:59:59.000Z

389

PARS II Configuration Update - Trusted Publisher  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Configuration Update - Trusted Publisher Configuration Update - Trusted Publisher As of July 15, 2013, all reports within SSS Reports will require a new Trusted Publisher to be accepted in order for reports to present correctly and as intended. The new Trusted Publisher certificate has been issued to the US Department of Energy by Entrust Code Signing Certification Authority - L1D and is valid until 4/22/2016. Depending upon the security settings within your domain for your workstation, administrative rights may be required to accept the new Trusted Publisher. If required, please contact your local IT Helpdesk for assistance. The original Trusted Publisher certificate, Dekker Ltd., may remain within your configuration settings. Acceptance of the new Trusted Publisher in no way affects any current reporting requirements.

390

Colleae System of Nevada Project Shaal Area - Fidd Data Summary Report  

Office of Legacy Management (LM)

Unlvers~ty and Cornrnun~ty Unlvers~ty and Cornrnun~ty Colleae System of Nevada Project Shaal Area - Fidd Data Summary Report Todd Mihevc, Greg Pohll and Brad Lyles submitted to Nevada Operations Office U.S. Department of Energy May 2000 Publication No. 45175 This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or any third party's use or the results of such use of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

391

Expert Meeting Report: Recommendations for Applying Water Heaters in Combination Space and Domestic Water Heating Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recommendations for Applying Recommendations for Applying Water Heaters in Combination Space and Domestic Water Heating Systems A. Rudd, K. Ueno, D. Bergey, R. Osser Building Science Corporation June 2012 i This report received minimal editorial review at NREL. NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark,

392

Passive-solar-cooling system concepts for small office buildings. Final report  

SciTech Connect

This report summarizes the efforts of a small group of building design professionals and energy analysis experts to develop passive solar cooling concepts including first cost estimates for small office buildings. Two design teams were brought together at each of two workshops held in the fall of 1982. Each team included an architect, mechanical engineer, structural engineer, and energy analysis expert. This report presents the passive cooling system concepts resulting from the workshops. It summarizes the design problems, solutions and first-cost estimates relating to each technology considered, and documents the research needs identified by the participants in attempting to implement the various technologies in an actual building design. Each design problem presented at the workshops was based on the reference (base case) small office building analyzed as part of LBL's Cooling Assessment. Chapter II summarizes the thermal performance, physical specifications and estimated first-costs of the base case design developed for this work. Chapters III - VI describe the passive cooling system concepts developed for each technology: beam daylighting; mass with night ventilation; evaporative cooling; and integrated passive cooling systems. The final Chapters, VII and VIII present the preliminary implications for economics of passive cooling technologies (based on review of the design concepts) and recommendations of workshop participants for future research in passive cooling for commercial buildings. Appendices provide backup information on each chapter as indicated.

Whiddon, W.I.; Hart, G.K.

1983-02-01T23:59:59.000Z

393

Report on the analysis of field data relating to the reliability of solar hot water systems.  

SciTech Connect

Utilities are overseeing the installations of thousand of solar hot water (SHW) systems. Utility planners have begun to ask for quantitative measures of the expected lifetimes of these systems so that they can properly forecast their loads. This report, which augments a 2009 reliability analysis effort by Sandia National Laboratories (SNL), addresses this need. Additional reliability data have been collected, added to the existing database, and analyzed. The results are presented. Additionally, formal reliability theory is described, including the bathtub curve, which is the most common model to characterize the lifetime reliability character of systems, and for predicting failures in the field. Reliability theory is used to assess the SNL reliability database. This assessment shows that the database is heavily weighted with data that describe the reliability of SHW systems early in their lives, during the warranty period. But it contains few measured data to describe the ends of SHW systems lives. End-of-life data are the most critical ones to define sufficiently the reliability of SHW systems in order to answer the questions that the utilities pose. Several ideas are presented for collecting the required data, including photometric analysis of aerial photographs of installed collectors, statistical and neural network analysis of energy bills from solar homes, and the development of simple algorithms to allow conventional SHW controllers to announce system failures and record the details of the event, similar to how aircraft black box recorders perform. Some information is also presented about public expectations for the longevity of a SHW system, information that is useful in developing reliability goals.

Menicucci, David F. (Building Specialists, Inc., Albuquerque, NM)

2011-07-01T23:59:59.000Z

394

Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993  

SciTech Connect

This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

Not Available

1993-12-31T23:59:59.000Z

395

Development of a Dispatchable PV Peak Shainv System. PV: Bonus Program - Phase 1 Report. Volume 1  

SciTech Connect

This report summarizes the work performed by Delmarva Power and Light and its subcontractors in Phase 1 of the US Department of Energy's PV:BONUS Program. The purpose of the program is to develop products and systems for buildings which utilize photovoltaic (N) technology. Beginning with a cooperative research effort with the University of Delaware's Center for Energy and Environmental Policy Research Delmarva Power developed and demonstrated the concept of Dispatchable PV Peak Shaving. This concept and the system which resulted horn the development work are unique from other grid-connected PV systems because it combines a PV, battery energy storage, power conversion and control technologies into an integrated package. Phase 1 began in July 1993 with the installation of a test and demonstration system at Delmarva's Northern Division General Office building near Newark, Delaware. Following initial testing throughout the summer and fall of 1993, significant modifications were made under an amendment to the DOE contract. Work on Phase 1 concluded in the early spring of 1995. Significant progress towards the goal of commercializing the system was made during Phase 1, and is summarized. Based on progress in Phase 1, a proposal to continue the work in Phase 2 was submitted to the US DOE in May 1995. A contract amendment and providing funds for the Phase 2 work is expected in July 1995.

None

1995-10-01T23:59:59.000Z

396

Advanced coal-fueled gas turbine systems: Subscale combustion testing. Topical report, Task 3.1  

SciTech Connect

This is the final report on the Subscale Combustor Testing performed at Textron Defense Systems` (TDS) Haverhill Combustion Laboratories for the Advanced Coal-Fueled Gas Turbine System Program of the Westinghouse Electric Corp. This program was initiated by the Department of Energy in 1986 as an R&D effort to establish the technology base for the commercial application of direct coal-fired gas turbines. The combustion system under consideration incorporates a modular staged, rich-lean-quench, Toroidal Vortex Slogging Combustor (TVC) concept. Fuel-rich conditions in the first stage inhibit NO{sub x} formation from fuel-bound nitrogen; molten coal ash and sulfated sorbent are removed, tapped and quenched from the combustion gases by inertial separation in the second stage. Final oxidation of the fuel-rich gases, and dilution to achieve the desired turbine inlet conditions are accomplished in the third stage, which is maintained sufficiently lean so that here, too, NO{sub x} formation is inhibited. The primary objective of this work was to verify the feasibility of a direct coal-fueled combustion system for combustion turbine applications. This has been accomplished by the design, fabrication, testing and operation of a subscale development-type coal-fired combustor. Because this was a complete departure from present-day turbine combustors and fuels, it was considered necessary to make a thorough evaluation of this design, and its operation in subscale, before applying it in commercial combustion turbine power systems.

Not Available

1993-05-01T23:59:59.000Z

397

Integrated Computer-Enhanced Remote Viewing System. Quarterly report number 4, July--October 1993  

SciTech Connect

The Interactive, Computer-Enhanced, Remote Viewing System (ICERVS) is a system designed to provide a reliable geometric description of a robotic task space in a fashion that enables robotic remediation to be carried out more efficiently and economically than with present systems. The key elements are a faithful way to store empirical data and a friendly user interface that provides an operator with timely access to all that is known about a scene. The development of ICERVS is to occur in three phases. Phase 1 will focus on the development of the Data Library, which contains the geometric data about the task space and the objects in it, and the Toolkit, which includes the mechanisms for manipulating and displaying both empirical and model data. Phase 2 will concentrate on integrating these subsystems with a sensor subsystem into one working system. Some additional functionality will be incorporated in the Data Library and Toolkit subsystems. Phase 3 will expand the configuration to meet the needs of a full scale demonstration of the interactive mapping of some waste site to be identified. The second Phase of the ICERVS project consists of nine tasks. Significant efforts were devoted to the completion of Task 1: Intermediate System Design, and Task 3: Computer Upgrade. This report describes progress in these two tasks.

Not Available

1993-11-30T23:59:59.000Z

398

E-Print Network 3.0 - analyse par chromatographie Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

search results for: analyse par chromatographie Page: << < 1 2 3 4 5 > >> 1 Nicholas ARMSTRONG 2 Jardins de Saint Jouanne Summary: changeuses d'ions. Analyses des ions par...

399

E-Print Network 3.0 - affectees par le Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

2005. Page n1. Feuille de TP n Summary: dans un fichier, dont le nom par defaut est matlab.mat, le contenu de certaines variables dont vous... Matlab, comme par exemple mean,...

400

Local-Level Prognostics Health Management Systems Framework for Passive AdvSMR Components – Interim Report  

SciTech Connect

This report describes research results to date in support of the integration and demonstration of diagnostics technologies for prototypical AdvSMR passive components (to establish condition indices for monitoring) with model-based prognostics methods. The focus of the PHM methodology and algorithm development in this study is at the localized scale. Multiple localized measurements of material condition (using advanced nondestructive measurement methods), along with available measurements of the stressor environment, enhance the performance of localized diagnostics and prognostics of passive AdvSMR components and systems.

Ramuhalli, Pradeep; Roy, Surajit; Hirt, Evelyn H.; Pardini, Allan F.; Jones, Anthony M.; Deibler, John E.; Pitman, Stan G.; Tucker, Joseph C.; Prowant, Matthew S.; Suter, Jonathan D.

2014-09-12T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

REPORT OF SURVEY OF THE LOS ALAMOS TRITIUM SYSTEMS TEST ASSEMBLY FACILITY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE LOS ALAMOS TRITIUM THE LOS ALAMOS TRITIUM SYSTEMS TEST ASSEMBLY FACILITY U.S. Department of Energy Office of Environmental Management & Office of Science Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility Rev. E (Final) October 3, 2000 Contents 1. Introduction 1.1 Purpose 1.2 Facility Description 1.3 Organization Representatives 1.4 Survey Participants 2. Summary, Conclusions & Recommendations 2.1 Comparison With LCAM Requirements 2.2 Transfer Considerations 2.3 Post-Transfer EM Path Forward & Management Risk 2.4 Post-Transfer S&M Reduction via Administrative Contamination Limit Revision 2.5 Stable Metal Tritides Consideration During D&D 3. Survey Results

402

Interim Report: Coiled Tubing Drilling and Intervention System Using Cost Effective Vessel  

NLE Websites -- All DOE Office Websites (Extended Search)

DOCUMENT TITLE: DOCUMENT TITLE: Self Supporting Riser Technology to Enable Coiled Tubing Intervention for Deepwater Wells Document No.: 08121-1502-12 RPSEA PROJECT TITLE: Coil Tubing Drilling and Intervention System Using a Cost Effective Vessel RPSEA Project No.: 08121-1502 01 April 2011 Charles R. Yemington, PE Project Manager Nautilus International 400 North Sam Houston Parkway East, Suite 105 Houston, Texas 77060 RPSEA Project No.: 08121-1502 Coiled Tubing Drilling and Intervention System Using a Cost Effective Vessel RPSEA Project 08121-1502 01 April 2011 Page 2 of 91 LEGAL NOTICE This report was prepared by Nautilus International, LLC. as an account of work sponsored by the Research Partnership to Secure Energy for America (RPSEA). RPSEA members, the

403

Business System Management Review Template  

NLE Websites -- All DOE Office Websites (Extended Search)

F-009 Business System Management Review Template 09_0519 Page 1 of 12 F-009 Business System Management Review Template 09_0519 Page 1 of 12 Company - Business Form Document Title: Business System Management Review Template Document Number: F-009 Rev. 11_0628 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-004, Business System Management Review Notify of Changes: QAM, MGT Referenced Document(s): N/A F-009 Business System Management Review Template 09_0519 Page 2 of 12 Revision History: Rev. Description of Change A Initial Release 09_0519 Format changes made to template (in particular Section 7.0 CAR/PAR/IO reporting) and several edits for clarification and ease of reading. 11_0628 Modified template categories to reflect current process

404

TEST & EVALUATION REPORT FOR THE HEDGEHOG-II PACKAGING SYSTEMS DOT-7A TYPE A CONTAINER  

SciTech Connect

This report documents the US. Department of Transportation Specification 7A (DOT-7A) Type A compliance test and evaluation results for the Hedgehog-II packaging systems. The approved Hedgehog-II packaging configurations provide primary and secondary containment. The approved packaging configurations described within this report are designed to ship Type A quantities of radioactive materials, normal form. Contents may be in solid or liquid form. Liquids transported in the approved 1 L glass bottle assembly shall have a specific gravity of less than or equal to 1.6. Liquids transported in all other approved configurations shall have a specific gravity of less than or equal to 2.0. The solid contents, including packaging, are limited in weight to the gross weight of the as-tested liquids and bottles. The approved Hedgehog-II packaging configurations described in this report may be transported by air, and have been evaluated as meeting the applicable International Air Transport Association/International Civil Aviation Organization (IATA/ICAO) Dangerous Goods Regulations in addition to the DOT requirements.

KELLY, D.L.

2003-12-29T23:59:59.000Z

405

Par Sophie Rodrigue Pour Gabriel Blouin-Demers  

E-Print Network (OSTI)

dans le sol de l'épandange de fertilisants phosphatés · �valuer la contamination radioactive de l · Contamination radioactive potentielle de la chaîne alimentaire et de l'eau souterraine · RecommendationsPar Sophie Rodrigue EVS4904 Pour Gabriel Blouin-Demers http://www.bccdc.org/images/site/rps/radioactivity

Blouin-Demers, Gabriel

406

DTECTEUR DE CONTAMINATION RADIOACTIVE Par M. BRIRE et J. WEILL,  

E-Print Network (OSTI)

623. D�TECTEUR DE CONTAMINATION RADIOACTIVE Par M. BRI�RE et J. WEILL, Division des Constructions rapidement sur leurs mains, chaussures et vêtements toute trace de contamination. Le principe utilisé permet'utilisation. LE JOURNAL DE PHYSIQUE ET LE RADIUM. TOME 14, NOVEMBRE 1953, , Le détecteur de contamination

Paris-Sud XI, Université de

407

prsente par ESCAMILLA DE LOS SANTOS Jos Guadalupe  

E-Print Network (OSTI)

THESE présentée par ESCAMILLA DE LOS SANTOS José Guadalupe pour obtenir le grade de DOCTEUR de l": Rubby "la CasaLas", Rodrigo, Harold, Mary et Coquita pour toute la chaleur et l'amitié qu'ils m

Paris-Sud XI, Université de

408

INSTITUT POLYTECHNIQUE DE GRENOBLE N attribu par la bibliothque  

E-Print Network (OSTI)

Metal Oxide Semiconductor Field Effect Transistor MPU MicroProcessor Unit NA Numerical Aperture OCD : Micro et Nano Electronique » préparée au laboratoire des technologies de la microélectronique (LTM) dansC amorphous Carbon ANOVA ANalysis Of VAriance ARC Anti-Reflective Coating ARDE Aspect Ratio Dependent Etching

Paris-Sud XI, Université de

409

N d'ordre : 2362009 Anne 2009 Dlivre par  

E-Print Network (OSTI)

RECOUVREMENT DES CAPACIT�S MOTRICES - FORCE MUSCULAIRE ET IMAGERIE MOTRICE ­ Directeur de Thèse : M. GUILLOT Laboratoire de la Performance Motrice, Mentale et du Matériel, dirigé par le Professeur Christian Collet. J

Paris-Sud XI, Université de

410

Refurbish power supply/distribution system, Phase 2, Y-12 Plant, Oak Ridge. Progress status report number 51  

SciTech Connect

This is a report on the phase 2 of refurbishing power supply/distribution system at Y-12 Plant, Oak Ridge, TN. The report topics include accomplishments by work breakdown structure (WBS) identifier, identification of items issued and items received, past due items, items requested, a milestone schedule by WBS and including a drawing list showing percent complete, and conference summaries.

NONE

1995-11-30T23:59:59.000Z

411

Design of gasifiers to optimize fuel cell systems. Final report, September 1990--September 1993  

SciTech Connect

Pursuing the key national goal of clean and efficient utilization of the abundant domestic coal resources for power generation, this study was conducted to evaluate the potential of optimizing the integrated catalytic gasification/carbonate fuel cell power generation system. ERC in close collaboration with Fluor Daniel (providing engineering design and costing), conducted a detailed system configuration study to evaluate various catalytic gasification/carbonate fuel cell power plant configurations and compare them to present day, as well as emerging, alternate coal-based power plant technologies to assess their competitive position. A Topical Report (1992) was submitted documenting this effort, and the three catalytic gasification case studies are summarized in Appendix A. Results of this study indicate that system efficiencies approaching 55% (HHV) can be achieved by integrating low temperature catalytic gasification with high efficiency carbonate fuel cells. Thermal balance in the gasifier is achieved without oxygen by recycling hydrogen from the fuel cell anode exhaust. A small amount of air is added to the gasifier to minimize hydrogen recycle. In order to validate the assumptions made in the case configurations, experimental studies were performed to determine the reactivity of Illinois No. 6 coal with the gasification catalysts. The reactivity of the catalyzed coal has significant bearing on gasifier sizing and hence system cost and efficiency.

Not Available

1993-08-01T23:59:59.000Z

412

Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report  

SciTech Connect

The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

Iovenitti, Joe

2013-05-15T23:59:59.000Z

413

Dixie Valley Engineered Geothermal System Exploration Methodology Project, Baseline Conceptual Model Report  

DOE Data Explorer (OSTI)

The Engineered Geothermal System (EGS) Exploration Methodology Project is developing an exploration approach for EGS through the integration of geoscientific data. The Project chose the Dixie Valley Geothermal System in Nevada as a field laboratory site for methodlogy calibration purposes because, in the public domain, it is a highly characterized geothermal systems in the Basin and Range with a considerable amount of geoscience and most importantly, well data. This Baseline Conceptual Model report summarizes the results of the first three project tasks (1) collect and assess the existing public domain geoscience data, (2) design and populate a GIS database, and (3) develop a baseline (existing data) geothermal conceptual model, evaluate geostatistical relationships, and generate baseline, coupled EGS favorability/trust maps from +1km above sea level (asl) to -4km asl for the Calibration Area (Dixie Valley Geothermal Wellfield) to identify EGS drilling targets at a scale of 5km x 5km. It presents (1) an assessment of the readily available public domain data and some proprietary data provided by Terra-Gen Power, LLC, (2) a re-interpretation of these data as required, (3) an exploratory geostatistical data analysis, (4) the baseline geothermal conceptual model, and (5) the EGS favorability/trust mapping. The conceptual model presented applies to both the hydrothermal system and EGS in the Dixie Valley region.

Joe Iovenitti

414

The impact of electric vehicles on the Southern California Edison System. Final report  

SciTech Connect

This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the ``Air Quality Impacts of Energy Efficiency`` Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers` view has been studied with special emphasis on the role of marketable permit systems. The utilities` view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility`s average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

Ford, A.

1992-07-01T23:59:59.000Z

415

New vision solar system exploration missions study: Analysis of the use of biomodal space nuclear power systems to support outer solar system exploration missions. Final report  

SciTech Connect

This report presents the results of an analysis of the capability of nuclear bimodal systems to perform outer solar system exploration missions. Missions of interest include orbiter mission s to Mars, Jupiter, Saturn, Uranus, Neptune, and Pluto. An initial technology baseline consisting of a NEBA 10 kWe, 1000 N thrust, 850 s, 1500 kg bimodal system was selected, and its performance examined against a data base for trajectories to outer solar system planetary destinations to select optimal direct and gravity assisted trajectories for study. A conceptual design for a common bimodal spacecraft capable of performing missions to all the planetary destinations was developed and made the basis of end to end mission designs for orbiter missions to Jupiter, Saturn, and Neptune. Concepts for microspacecraft capable of probing Jupiter`s atmosphere and exploring Titan were also developed. All mission designs considered use the Atlas 2AS for launch. It is shown that the bimodal nuclear power and propulsion system offers many attractive option for planetary missions, including both conventional planetary missions in which all instruments are carried by a single primary orbiting spacecraft, and unconventional missions in which the primary spacecraft acts as a carrier, relay, and mother ship for a fleet of micro spacecraft deployed at the planetary destination.

NONE

1995-12-08T23:59:59.000Z

416

TUDE DE LA PHASE INITIALE DU CLAQUAGE D'UN GAZ PAR UN LASER Par V. CHALMETON,  

E-Print Network (OSTI)

the threshold for optical gas breakdown. The variations of the appearance threshold of these electrons seuil de claquage laser, qui est fonction de la pression et de la nature du gaz, de la qualite de l explication faisant intervenir une multiplication en cascade des electrons par bremstrahlung inverse dans le

Paris-Sud XI, Université de

417

HVAC systems in the current stock of U. S. K-12 schools. Final report, May 91-Mar 92  

SciTech Connect

The report summarizes information on heating, ventilating, and air-conditioning (HVAC) systems commonly found in U.S. school buildings and the effect that operating these systems has on indoor radon levels. The report describes the ability of various HVAC systems to pressurize and ventilate classroom spaces, how they operate, and how they are controlled. Some information is given to compare systems from the standpoint of energy use, cost, and their ability to maintain stable levels of static pressure in classrooms and/or to adequately ventilate the spaces. There do not appear to be any well defined trends in types of HVAC systems involved in current school building construction and modification. Systems looked at include those using reheat and/or mixing, unit ventilators (UVs), and two-fan, dual-duct variable air volume (VAV) systems.

Parker, J.D.

1992-07-01T23:59:59.000Z

418

Design, development and deployment of public service photovoltaic power/load systems for the Gabonese Republic. Final report  

SciTech Connect

Five different types of public service photovoltaic power/load systems installed in the Gabonese Republic are discussed. The village settings, the systems, performance results and some problems encountered are described. Most of the systems performed well, but some of the systems had problems due to failure of components or installation errors. The project was reasonably successful in collecting and reporting data for system performance evaluation that will be useful for guiding officials and system designers involved in village power applications in developing countries.

Kaszeta, W.J.

1987-04-01T23:59:59.000Z

419

Fluidized-bed waste-heat recovery system development: Final report  

SciTech Connect

A major energy loss in industry is the heat content of the flue gases from industrial process heaters. One effective way to utilize the energy, which is applicable to all processes, is to preheat the combustion air for the process heater. Although recuperators are available to preheat this air when the flue gases are clean, recuperators to recover the heat from dirty and corrosive flue gases do not exist. The Fluidized-Bed Waste-Heat Recovery (FBWHR) system is designed to preheat this combustion air using the heat available in dirty flue gas streams. In this system, recirculating alumina particles are heated by the flue gas in a raining bed. The hot particles are then removed from the bed and placed in a fluidized bed where they are fluidized by the combustion air. Through this process, the combustion air is preheated. The cooled particles are then returned to the raining bed. Initial development of this concept is for the aluminum smelting industry. In this final report, the design, development, fabrication, and installation of a full-scale FBWHR system is detailed.

Patch, K.D.; Cole, W.E.

1988-06-01T23:59:59.000Z

420

Report for slot cutter proof-of-principle test, Buried Waste Containment System project. Revision 1  

SciTech Connect

Several million cubic feet of hazardous and radioactive waste was buried in shallow pits and trenches within many US Department of Energy (US DOE) sites. The pits and trenches were constructed similarly to municipal landfills with both stacked and random dump waste forms such as barrels and boxes. Many of the hazardous materials in these waste sites are migrating into groundwater systems through plumes and leaching. On-site containment is one of the options being considered for prevention of waste migration. This report describes the results of a proof-of-principle test conducted to demonstrate technology for containing waste. This proof-of-principle test, conducted at the RAHCO International, Inc., facility in the summer of 1997, evaluated equipment techniques for cutting a horizontal slot beneath an existing waste site. The slot would theoretically be used by complementary equipment designed to place a cement barrier under the waste. The technology evaluated consisted of a slot cutting mechanism, muck handling system, thrust system, and instrumentation. Data were gathered and analyzed to evaluate the performance parameters.

NONE

1998-05-21T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Operating experience feedback report -- turbine-generator overspeed protection systems: Commercial power reactors. Volume 11  

SciTech Connect

This report presents the results of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) review of operating experience of main turbine-generator overspeed and overspeed protection systems. It includes an indepth examination of the turbine overspeed event which occurred on November 9, 1991, at the Salem Unit 2 Nuclear Power Plant. It also provides information concerning actions taken by other utilities and the turbine manufacturers as a result of the Salem overspeed event. AEOD`s study reviewed operating procedures and plant practices. It noted differences between turbine manufacturer designs and recommendations for operations, maintenance, and testing, and also identified significant variations in the manner that individual plants maintain and test their turbine overspeed protection systems. AEOD`s study provides insight into the shortcomings in the design, operation, maintenance, testing, and human factors associated with turbine overspeed protection systems. Operating experience indicates that the frequency of turbine overspeed events is higher than previously thought and that the bases for demonstrating compliance with NRC`s General Design Criterion (GDC) 4, Environmental and dynamic effects design bases, may be nonconservative with respect to the assumed frequency.

Ornstein, H.L.

1995-04-01T23:59:59.000Z

422

Advanced Recyclable Media System{reg_sign}. Innovative technology summary report  

SciTech Connect

The objective of the Large-Scale Demonstration Project (LSDP) is to select and demonstrate potentially beneficial technologies at the Argonne National Laboratory East`s (ANL) Chicago Pile-5 (CP-5) Research Reactor. The purpose of the LSDP is to demonstrate that using innovative and improved deactivation and decommissioning (D and D) technologies from various sources can result in significant benefits, such as decreased cost and increased health and safety, as compared with baseline D and D technologies. This report describes a demonstration of the Advanced Recyclable Media System{reg_sign} technology which was employed by Surface Technology Systems, Inc. to remove coatings from a concrete floor. This demonstration is part of the CP-5 LSDP sponsored by the US Department of Energy (DOE) Office of Science and Technology Deactivation and Decommissioning Focus Area (DDFA). The Advanced Recyclable Media System{reg_sign} (ARMS) technology is an open blast technology which uses a soft recyclable media. The patented ARMS Engineered Blast Media consists of a fiber-reinforced polymer matrix which can be manufactured in various grades of abrasiveness. The fiber media can be remade and/or reused up to 20 times and can clean almost any surface (e.g., metal, wood, concrete, lead) and geometry including corners and the inside of air ducts.

NONE

1998-12-01T23:59:59.000Z

423

Idaho National Laboratory Integrated Safety Management System FY 2012 Effectiveness Review and Declaration Report  

SciTech Connect

Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safe and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.

Farren Hunt

2012-12-01T23:59:59.000Z

424

Techniques for energy conservation in ac motor-driven systems. Final report  

SciTech Connect

Techniques for energy conservation of reducing losses in ac motor-driven systems proposed by the technical community in response to surging cost of energy are evaluated and compared. Report objectives are to provide better understanding of underlying principles and to evaluate technical and economic viability of these techniques for various applications. An important aspect considered is the impact on electric utility system in terms of harmonics, power factor of operation, and Electro-Magnetic Interference (EMI). The techniques evaluated are: NASA Power Factor Controller, a simple device for reducing power losses in lightly loaded ac motors; wanlass motor modification, a scheme of reconnecting motor windings with capacitors in series, with the intention of improving the motor efficiencies under all loading conditions; conventional variable frequency solid-state inverters which can control the speed of ac motors by producing adjustable frequency ac voltage, with a significant potential for energy conservation in pumps and air-handling systems; and other variable frequency drives and schemes including cycloconverters, slip-recovery scheme, Exxon Alternating Current Synthesizer, Venturini conversion technique, permanent magnet synchronous motors, and a device called the Phase-Liner. The impact of rapid growth in semiconductors and magnetic materials technologies is also considered.

Mohan, N.

1981-09-01T23:59:59.000Z

425

Coal-fired high performance power generating system. Quarterly progress report, April 1--June 30, 1993  

SciTech Connect

This report covers work carried out under Task 2, Concept Definition and Analysis, Task 3, Preliminary R&D and Task 4, Commercial Generating Plant Design, under Contract AC22-92PC91155, ``Engineering Development of a Coal Fired High Performance Power Generation System`` between DOE Pittsburgh Energy Technology Center and United Technologies Research Center. The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) by the year 2000 that is capable of: >47% thermal efficiency; NO{sub x}, SO{sub x} and Particulates {le}25% NSPS; cost {ge}65% of heat input; all solid wastes benign. In order to achieve these goals our team has outlined a research plan based on an optimized analysis of a 250 MW{sub e} combined cycle system applicable to both frame type and aeroderivative gas turbines. Under the constraints of the cycle analysis we have designed a high temperature advanced furnace (HITAF) which integrates several combustor and air heater designs with appropriate ash management procedures. A survey of currently available high temperature alloys has been completed and some of their high temperature properties are shown for comparison. Several of the most promising candidates will be selected for testing to determine corrosion resistance and high temperature strength. The corrosion resistance testing of candidate refractory coatings is continuing and some of the recent results are presented. This effort will provide important design information that will ultimately establish the operating ranges of the HITAF.

Not Available

1993-11-01T23:59:59.000Z

426

DovERA-65)q---7- Final Report Theoretical Studies of Magnetic Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

DovERA-65)q---7- DovERA-65)q---7- Final Report - Theoretical Studies of Magnetic Systems ' L. P. Gor'kov M. A. Novotny J. R. Schrieffer endpoint to the pub lication or Ve have *no o bjection fro g s a patent August 1, 1994 - November 30, 19gssen tination of this materials. l'e altYYQA(A.,-' '-a- 1 0 9 f National High Magnetic Field Labora Florida State University / _,iktiI,,, Fez, of Intellectual 1800 E Paul Dirac Dr. Property Counsel I. During the grant period we have studied five areas of research, 1) low dimensional ferrimagnets, 2) lattice effects in the mixed valence problem, 3) spin compensation in the one dimensional Kondo lattice, 4) the interaction of quasi particles in short coherence length superconductors, and 5) novel effects in angle resolved photoemission spectra from nearly

427

Evaluation of 2004 Toyota Prius Hybrid Electric Drive System Interim Report  

SciTech Connect

Laboratory tests were conducted to evaluate the electrical and mechanical performance of the 2004 Toyota Prius and its hybrid electric drive system. As a hybrid vehicle, the 2004 Prius uses both a gasoline-powered internal combustion engine and a battery-powered electric motor as motive power sources. Innovative algorithms for combining these two power sources results in improved fuel efficiency and reduced emissions compared to traditional automobiles. Initial objectives of the laboratory tests were to measure motor and generator back-electromotive force (emf) voltages and determine gearbox-related power losses over a specified range of shaft speeds and lubricating oil temperatures. Follow-on work will involve additional performance testing of the motor, generator, and inverter. Information contained in this interim report summarizes the test results obtained to date, describes preliminary conclusions and findings, and identifies additional areas for further study.

Ayers, C.W.

2004-11-23T23:59:59.000Z

428

Wind Turbine Generator System Duration Test Report for the ARE 442 Wind Turbine  

SciTech Connect

This test is being conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, four turbines are being tested at the NWTC as a part of this project. Duration testing is one of up to 5 tests that may be performed on the turbines, including power performance, safety and function, noise, and power quality tests. The results of the testing provide manufacturers with reports that may be used for small wind turbine certification. The test equipment includes a grid connected ARE 442 wind turbine mounted on a 30.5 meter (100 ft) lattice tower manufactured by Abundant Renewable Energy. The system was installed by the NWTC Site Operations group with guidance and assistance from Abundant Renewable Energy.

van Dam, J.; Baker, D.; Jager, D.

2010-05-01T23:59:59.000Z

429

LDRD final report : a lightweight operating system for multi-core capability class supercomputers.  

SciTech Connect

The two primary objectives of this LDRD project were to create a lightweight kernel (LWK) operating system(OS) designed to take maximum advantage of multi-core processors, and to leverage the virtualization capabilities in modern multi-core processors to create a more flexible and adaptable LWK environment. The most significant technical accomplishments of this project were the development of the Kitten lightweight kernel, the co-development of the SMARTMAP intra-node memory mapping technique, and the development and demonstration of a scalable virtualization environment for HPC. Each of these topics is presented in this report by the inclusion of a published or submitted research paper. The results of this project are being leveraged by several ongoing and new research projects.

Kelly, Suzanne Marie; Hudson, Trammell B. (OS Research); Ferreira, Kurt Brian; Bridges, Patrick G. (University of New Mexico); Pedretti, Kevin Thomas Tauke; Levenhagen, Michael J.; Brightwell, Ronald Brian

2010-09-01T23:59:59.000Z

430

Ground water impact assessment report for the 216-B-3 Pond system  

SciTech Connect

Ground water impact assessments were required for a number of liquid effluent receiving sites according to the Hanford Federal Facility Agreement and Consent Order Milestones M-17-00A and M-17-00B, as agreed upon by the US Department of Energy. This report is one of the last three assessments required and addresses the impact of continued discharge of uncontaminated wastewater to the 216-B-3C expansion lobe of the B Pond system in the 200 East Area until June 1997. Evaluation of past and projected effluent volumes and composition, geohydrology of the receiving site, and contaminant plume distribution patterns, combined with ground water modeling, were used to assess both changes in ground water flow regime and contaminant-related impacts.

Johnson, V.G.; Law, A.G.; Reidel, S.P.; Evelo, S.D.; Barnett, D.B.; Sweeney, M.D.

1995-01-01T23:59:59.000Z

431

Final Report, Validation of Novel Planar Cell Design for MW-Scale SOFC Power Systems  

SciTech Connect

This report describes the work completed by NexTech Materials, Ltd. during a three-year project to validate an electrolyte-supported planar solid oxide fuel cell design, termed the FlexCell, for coal-based, megawatt-scale power generation systems. This project was focused on the fabrication and testing of electrolyte-supported FlexCells with yttria-stabilized zirconia (YSZ) as the electrolyte material. YSZ based FlexCells were made with sizes ranging from 100 to 500 cm2. Single-cell testing was performed to confirm high electrochemical performance, both with diluted hydrogen and simulated coal gas as fuels. Finite element analysis modeling was performed at The Ohio State University was performed to establish FlexCell architectures with optimum mechanical robustness. A manufacturing cost analysis was completed, which confirmed that manufacturing costs of less than $50/kW are achievable at high volumes (500 MW/year).

Swartz, Dr Scott L.; Thrun, Dr Lora B.; Arkenberg, Mr Gene B.; Chenault, Ms Kellie M.

2012-01-03T23:59:59.000Z

432

Expert Meeting Report: Exploring the Disconnect Between Rated and Field Performance of Water Heating Systems  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exploring the Disconnect Exploring the Disconnect Between Rated and Field Performance of Water Heating Systems M. Hoeschele and E. Weitzel Alliance for Residential Building Innovation (ARBI) May 2013 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark,

433

Development of a coal combustion product (CCP) database system. Final report  

SciTech Connect

Nearly 90 million tons of coal combustion products (CCPs) are produced annually in the United States. The value of CCPs is well established by research and commercial practice; however, only 25% of these products are utilized. The objective of this project was to develop a computer program containing a database of advanced analytical and comprehensive engineering information on CCPs, accessible through a user-friendly interface. Version 1.0 of the ACAA CCP Data Manager was specifically designed to: perform multiple-criteria queries to produce a set of sample for in-depth study; view and print standard test reports, such as C618 reports; compare and contrast analytical results in graphs and tables; graph utilization information by application and region; and save data to a file for use in other computer applications, such as spreadsheet programs. The program was designed to contain descriptive information about a given CCP sample, including sample formation data (material type, sample location, fuel type, collection device etc.), combustion system design data (steam generator type, furnace type, SO{sub 2} and NO{sub x} control information, ash-handling configurations), test data (chemical, mineralogical, and physical characterization data), and utilization potential of the CCP. The location of the plant is identified by region. The database has been initially populated with information on over 800 CCP samples, taken from the Coal Ash Resources Research Consortium (CARRC). An installation package and user`s guide was developed for unlimited distribution by the American Coal Ash Association (ACAA).

O`Leary, E.M.; Pflughoeft-Hassett, D.F.

1997-09-01T23:59:59.000Z

434

ORNL Superconducting Technology Program for Electric Power Systems, Annual Report for FY 1998  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for commercial development of electric power applications of high temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1998 Annual Program Review held July 20-22, 1998. Aspects of ORNL's work that were presented at the Applied Superconductivity Conference (September 1998) are included in this report, as well. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high temperature superconductor wire and wire-using systems.

Hawsey, R.A.; Murphy, A.W.

1999-04-01T23:59:59.000Z

435

FY-2011 Status Report for Thermodynamics and Kinetics of Advanced Separations Systems  

SciTech Connect

This report presents a summary of the work performed in the area of thermodynamics and kinetics of advanced separations systems under the Fuel Cycle Research and Development (FCR&D) program during FY 2011 at the INL. On the thermodynamic front, investigations of liquid-liquid distribution of lanthanides at TALSPEAK-related conditions continued in FY11. It has been determined that a classical ion-exchanging phase transfer mechanism, where three HDEHP dimers solvate the metal ion in the organic phase, dominates metal extraction for systems that contain up to 0.1 M free lactate in solution. The correct graphical interpretation of the observed data in those regions relied on incorporating corrections for non-ideal behavior of HDEHP dimer in aliphatic diluents as well as sodium extraction equilibria. When aqueous conditions enter the complex regions of high lactate concentrations, slope analysis is no longer possible. When normalized metal distribution ratios were studied along the increasing concentration of free lactate, a slope of -1 was apparent. Such dependency either indicates aqueous complexing competition from lactate, or, a more likely scenario, a participation of lactate in the extracted metal complex. This finding agrees with our initial assessment of postulated changes in the extraction mechanism as a source of the lactate-mediated loss of extraction efficiency. The observed shape in the lanthanide distribution curve in our studies of TALSPEAK systems was the same for solutions containing no lactate or 2.3 M lactate. As such we may conclude that the mechanism of phase transfer is not altered dramatically and remains similarly sensitive to effective charge density of the metal ion. In addition to these thermodynamics studies, this report also summarizes the first calorimetric determination of heat of extraction of 248Cm in a bi-phasic system. The heat of extraction measured by isothermal titration calorimetry is compared to that determined using van't Hoff calculations. Further investigations on the kinetics of extraction in TALSPEAK with macro quantities of lanthanides present in the initial aqueous phase composition have been performed. These results have been summarized and compared to previous work performed for FCR&D. In addition, the effects of HDEHP concentration in the organic phase on europium extraction have been studied.

Leigh R. Martin; Peter R. Zalupski; Travis S. Grimes

2011-09-01T23:59:59.000Z

436

Hot-gas cleanup system model development. Volume I. Final report  

SciTech Connect

This two-volume report summarizes the state of the art in performance modeling of advanced high-temperature, high-pressure (HTHP) gas cleanup devices. Volume I contains the culmination of the research effort carried over the past 12 months and is a summary of research achievements. Volume II is the user's manual for the computer programs developed under the present research project. In this volume, Section 2 presents background information on pressurized, fluidized-bed combustion concepts, a description of the role of the advanced gas cleanup systems, and a list of advanced gas cleanup systems that are currently in development under DOE sponsorship. Section 3 describes the methodology for the software architecture that forms the basis of the well-disciplined and structured computer programs developed under the present project. Section 4 reviews the fundamental theories that are important in analyzing the cleanup performance of HTHP gas filters. Section 5 discusses the effect of alkali agents in HTHP gas cleanup. Section 6 evaluates the advanced HTHP gas cleanup models based on their mathematical integrity, availability of supporting data, and the likelihood of commercialization. As a result of the evaluation procedure detailed in Section 6, five performance models were chosen to be incorporated into the overall system simulation code, ASPEN. These five models (the electrocyclone, ceramic bag filter, moving granular bed filter, electrostatic granular bed filter, and electrostatic precipitator) are described in Section 7. The method of cost projection for these five models is discussed in Section 8. The supporting data and validation of the computer codes are presented in Section 9, and finally the conclusions and recommendations for the HTHP gas cleanup system model development are given in Section 10. 72 references, 19 figures, 25 tables.

Ushimaru, K.; Bennett, A.; Bekowies, P.J.

1982-11-01T23:59:59.000Z

437

Nuclear proliferation and civilian nuclear power. Report of the Nonproliferation Alternative Systems Assessment Program. Volume IV. Commercial potential  

SciTech Connect

This volume of the Nonproliferation Alternative Systems Assessment Program (NASAP) report provides time and cost estimates for positioning new nuclear power systems for commercial deployment. The assessment also estimates the rates at which the new systems might penetrate the domestic market, assuming the continuing viability of the massive light-water reactor network that now exists worldwide. This assessment does not recommend specific, detailed program plans and budgets for individual systems; however, it is clear from this analysis that any of the systems investigated could be deployed if dictated by national interest.

Not Available

1980-06-01T23:59:59.000Z

438

LTC America`s, Inc. PTC-6 vacuum system (metal): Baseline report  

SciTech Connect

The LTC coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers the evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The LTC coating removal system consisted of several hand tools, a Roto Peen scaler, and a needlegun. They are designed to remove coatings from steel, concrete, brick, and wood. These hand tools are used with the LTC PTC-6 vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. The dust exposure was minimal but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

NONE

1997-07-31T23:59:59.000Z

439

Decontamination systems information and research program. Quarterly report, January 1--March 31, 1997  

SciTech Connect

Progress reports are given on the following projects: (A) Subsurface contaminants, containment and remediation: 1.1 Characteristic evaluation of grout barriers in grout testing chamber; 1.2 Development of standard test protocols and barrier design models for desiccation barriers; 1.3 Development of standard test protocols and barrier design models for in-situ formed barriers -- technical support; 1.4 Laboratory studies and field testing at the DOE/RMI Extrusion Plant (Ashtabula, Ohio); 1.5 Use of drained enhanced soil flushing for contaminants removal; (B) Mixed waste characterization, treatment and disposal: Analysis of the Vortec cyclone melting system for remediation of PCB contaminated soils using computational fluid dynamics; (C) Decontamination and decommissioning: 3.1 Production and evaluation of biosorbents and cleaning solutions for use in D and D; 3.2 Use of Spintek centrifugal membrane technology and sorbents/cleaning solutions in the D and D of DOE facilities; (D) Cross-cutting innovative technologies: 4.1 Use of centrifugal membrane technology with novel membranes to treat hazardous/radioactive wastes; 4.2 Environmental pollution control devices based on novel forms of carbon; 4.3 Design of rotating membrane filtration system for remediation technologies; and (E) Outreach: Small business technical based support.

NONE

1997-12-31T23:59:59.000Z

440

ORNL Superconducting Technology Program for electric power systems. Annual report for FY 1995  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for commercial development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and systems development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1995 Annual Program Review held August 1-2, 1995. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems.

Hawsey, R.A. [comp.; Turner, J.W. [ed.

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Design, Fabrication, and Certification of Advanced Modular PV Power Systems Final Technical Progress Report  

SciTech Connect

This report describes the overall accomplishments and benefits of Solar Electric Specialties Co. (SES) under this Photovoltaic Manufacturing Technology (PVMaT) subcontract. SES addressed design issues related to their modular autonomous PV power supply (MAPPS) and a mobile photogenset. MAPPS investigations included gel-cell batteries mounted horizontally; redesign of the SES power supply; modified battery enclosure for increased safety and reduced cost; programmable, interactive battery charge controllers; and UL and FM listings. The photogenset systems incorporate generators, battery storage, and PV panels for a mobile power supply. The unit includes automatic oil-change systems for the propane generators, collapsible array mounts for the PV enclosure, and internal stowage of the arrays. Standardizing the products resulted in product lines of MAPPS and Photogensets that can be produced more economically and with shorter lead times, while increasing product quality and reliability. Product assembly and quality control have also been improved and streamlined with the development of standardized assembly processes and QC testing procedures. SES offers the UL-listed MAPPS at about the same price as its previous non-standardized, unlisted products.

Lambarski, T.; Minyard, G. (Solar Electric Specialties Co., Willits, California)

1998-10-06T23:59:59.000Z

442

COMMUNITY REPORT September 2014  

E-Print Network (OSTI)

COMMUNITY REPORT September 2014 BIAS REPORT AND SUPPORT SYSTEM #12;8 Bias Report and Support System Charge: The Bias Report at Washington University. Through the BRSS, students will be able to report incidents of bias. The working group

Larson-Prior, Linda

443

Le jugement des candidats par les entreprises lors des recrutements  

E-Print Network (OSTI)

l'explication du chômage par les modèles de recherche d'emploi ou job search. Or, comme le concèdent l'employer search. Cet article prolonge cette intuition en se donnant pour objectif de mettre en'hypothèse travaillée est celle d'un lien entre la façon dont s'opèrent les mises en relation sur le marché du travail

Paris-Sud XI, Université de

444

DISPOSITIF DE COMPTAGE SOUSTRACTIF A TUBES DKATRONS Par A. COCHE, .  

E-Print Network (OSTI)

circonférence et une anode centrale P. Lorsqu'une différence de potentiel suffisante est appli- quée entre une des cathodes et l'anode, une décharge s'amorce, rendue visible par la gaine lumineuse qui entoure la formant deux groupes Gi et G2, appelés guides. La décharge étant établie entre l'anode et une des cathodes

Boyer, Edmond

445

Draft report on melt point as a function of composition for urania-based systems  

SciTech Connect

This report documents the testing of a urania (UO{sub 2.00}) sample as a baseline and the attempt to determine the melt point associated with 4 compositions of urania-ceria and urania-neodymia pseudo binaries provided by ORNL, with compositions of 95/5, and 80/20 and of (U/Ce)O{sub 2.00} and (U/Nd)O{sub 2.00} in the newly developed ceramic melt point determination system. A redesign of the system using parts fabricated from tungsten was undertaken in order to help prevent contamination and tungsten carbide formation in the crucibles. The previously developed system employed mostly graphite parts that were shown to react with the sample containment black-body crucible leading to unstable temperature readings and crucible failure, thus the redesign. Measured melt point values of UO{sub 2.00} and U{sub 0.95}Ce{sub 0.05}O{sub 2.00}, U{sub 0.80}Ce{sub 0.20}O{sub 2.00}, U{sub 0.95}Nd{sub 0.05}O{sub 2.00} and U{sub 0.80}Nd{sub 0.20}O{sub 2.00} were measured using a 2-color pyrometer. The value measured for UO{sub 2.00} was consistent with the published accepted value 2845 C {+-} 25 C, although a wide range of values has been published by researchers and will be discussed later in the text. For comparison, values obtained from a published binary phase diagram of UO{sub 2}-Nd{sub 2}O{sub 3} were used for comparison with our measure values. No literature melt point values for comparison with the measurements performed in this study were found for (U/Ce)O{sub 2.00} in our stoichiometry range.

Valdez, James A [Los Alamos National Laboratory; Byler, Darrin D [Los Alamos National Laboratory

2012-06-08T23:59:59.000Z

446

BOA: Asbestos pipe-insulation removal robot system. Phase I. Topical report, November 1993--December 1994  

SciTech Connect

Based on several key design criteria and site visits, we developed a Robot design and built a system which automatically strips the lagging and insulation from the pipes, and encapsulates them under complete vacuum operation. The system can operate on straight runs of piping in horizontal or vertical orientations. Currently we are limited to four-inch diameter piping without obstacles as well as a somewhat laborious emplacement and removal procedure. Experimental results indicated that the current robotic abatement process is sound yet needs to be further expanded and modified. One of the main discoveries was that a longitudinal cut to fully allow the paddles to dig in and compress the insulation off the pipe is essential. Furthermore, a different cutting method might be explored to alleviate the need for a deeper cut and to enable a combination of certain functions such as compression and cutting. Unfortunately due to a damaged mechanism caused by extensive testing, we were unable to perform vertical piping abatement experiments, but foresee no trouble in implementing them in the next proposed Phase. Other encouraging results have BOA removing asbestos at a rate of 4-5 ft./h compared to 3 ft./h for manual removal of asbestos with a 3-person crew. However, we feel confident that we can double the asbestos removal rate by improving cutting speed, and increasing the length of the BOA robot. The containment and vacuum system on BOA is able to achieve the regulatory requirement for airborne fiber emissions of 0.01 fibers/ccm/8-hr. shift. Currently, BOA weighs about 117 pounds which is more than a human is permitted to lift overhead under OSHA requirements (i.e., 25 pounds). We are considering designing the robot into two components (i.e., locomotor section and cutter/removal section) to aid human installation as well as incorporating composite materials. A more detailed list of all the technical modifications is given in this topical report.

Schempf, H.; Bares, J.E.

1995-01-01T23:59:59.000Z

447

Power systems development facility. Quarterly report, October 1--December 31, 1996  

SciTech Connect

This quarterly technical progress report summarizes the work completed during the fourth ID quarter, October 1 through December 31, 1996, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled {open_quotes}Hot Gas Cleanup Test Facility for ID Gasification and Pressurized Combustion.{close_quotes} The objective of this project, herein referred to as the Power Systems Development Facility (PSDF), is to evaluate hot gas particle control technologies Using coal-derived gas streams. This project entails the design, construction, installation, and use of a flexible test facility which can operate under realistic Gasification and combustion conditions. The major particulate control device (PCD) issues to be addressed include the integration of the PCDs into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. During this quarter considerable effort was expended in finalizing drawings and technical information for bid packages in support of the Request for Quotation (RFQ) for the fixed-price construction of the Foster Wheeler train. The packages were finalized and released for bids from seven companies at the beginning of November. A prebid meeting as held in mid-November when representatives from the interested companies toured the site and sought clarification on certain issues. Six bids were received by the end of December. Discussions were also held with a number of labor brokers to provide construction Support. Their bids are being evaluated in conjunction with those for the RFQ.

NONE

1997-05-01T23:59:59.000Z

448

Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points  

SciTech Connect

Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.

NSTec Environmental Restoration

2007-02-01T23:59:59.000Z

449

Advanced Turbine Systems (ATS) program conceptual design and product development. Quarterly progress report, December 1, 1995--February 29, 1996  

SciTech Connect

This report describes the overall program status of the General Electric Advanced Gas Turbine Development program, and reports progress on three main task areas. The program is focused on two specific products: (1) a 70-MW class industrial gas turbine based on the GE90 core technology, utilizing a new air cooling methodology; and (2) a 200-MW class utility gas turbine based on an advanced GE heavy-duty machine, utilizing advanced cooling and enhancement in component efficiency. The emphasis for the industrial system is placed on cycle design and low emission combustion. For the utility system, the focus is on developing a technology base for advanced turbine cooling while achieving low emission combustion. The three tasks included in this progress report are on: conversion to a coal-fueled advanced turbine system, integrated program plan, and design and test of critical components. 13 figs., 1 tab.

NONE

1997-06-01T23:59:59.000Z

450

SOLERAS - Solar Energy Water Desalination Project: Chicago Bridge and Iron Company. Final report: system design extension. Volume 1. Technical report  

SciTech Connect

The design of a solar energy powered, sea water desalination pilot plant for installation at Yanbu, Saudi Arabia, on the shore of the Red Sea is presented. Earlier work is introduced and a description of the system is presented. Important design analyses and cost reduction considerations are reviewed. The pilot plant design is described in detail. Construction plans for and projected operation of the plant are discussed.

Not Available

1985-01-01T23:59:59.000Z

451

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor coolant system and systems decontamination. Summary status report. Volume 1  

SciTech Connect

This document summarizes information relating to the decontamination and restoration of the Three Mile Island Unit 2 reactor coolant system and other plant systems. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data system which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced by the Three Mile Island Unit 2 on March 28, 1979. This report contains a summary of radiation exposures, manpower, and time spent in radiation areas during the referenced period. Support activities conducted outside of radiation areas are not included. Computer reports included are: A chronological listing of all activities related to decomtamination and restoration of the reactor coolant system and other plant systems for the period of April 5, 1979, through December 19, 1984; a summary of labor and exposures by department for the same time period; and summary reports for each major task undertaken in connection with this specific work scope during the referenced time period.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

452

Operational Readiness Review Final Report for K Basin Fuel Transfer System  

SciTech Connect

An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR Team did not have the opportunity to observe a shift turnover from one crew to another. The ORR Team has evaluated the risk of not observing this activity and considers the risk to be minimal based on the fact that operating staff are very familiar with the FTS equipment and its procedures, and because existing Conduct of Operations processes and procedures are adequate and implemented. Because the ORR Team has not observed two-shift FTS operations, we recommend that additional RL oversight be provided at the start of two-shift FTS operations to evaluate the adequacy of crew turnovers.

DAVIES, T.H.

2002-10-01T23:59:59.000Z

453

SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 2. Battelle Columbus Laboratories system requirements definition and system analysis  

SciTech Connect

System specifications, design criteria, and representative weather data necessary for the system evolution and preliminary design are generated. A detailed analysis and evaluation of the commercial-sized controlled environment agriculture system coupled with a solar energy system was conducted. A simulation model to test the performance of the greenhouse is presented. (BCS)

Not Available

1981-01-01T23:59:59.000Z

454

Industrial advanced turbine systems: Development and demonstration. Annual report, October 1, 1996--September 30, 1997  

SciTech Connect

The US DOE has initiated a program for advanced turbine systems (ATS) that will serve industrial power generation markets. The ATS will provide ultra-high efficiency, environmental superiority, and cost competitiveness. The ATS will foster (1) early market penetration that enhances the global competitiveness of US industry, (2) public health benefits resulting from reduced exhaust gas emissions of target pollutants, (3) reduced cost of power used in the energy-intensive industrial marketplace and (4) the retention and expansion of the skilled US technology base required for the design, development and maintenance of state-of-the-art advanced turbine products. The Industrial ATS Development and Demonstration program is a multi-phased effort. Solar Turbines Incorporated (Solar) has participated in Phases 1 and 2 of the program. On September 14, 1995 Solar was awarded a Cooperative Agreement for Phases 3 and 4 of the program. Phase 3 of the work is separated into two subphases: Phase 3A entails Component Design and Development Phase 3B will involve Integrated Subsystem Testing. Phase 4 will cover Host Site Testing. Forecasts call for completion of the program within budget as originally estimated. Scheduled completion is forecasted to be approximately 3 years late to original plan. This delay has been intentionally planned in order to better match program tasks to the anticipated availability of DOE funds. To ensure the timely realization of DOE/Solar program goals, the development schedule for the smaller system (Mercury 50) and enabling technologies has been maintained, and commissioning of the field test unit is scheduled for May of 2000. As of the end of the reporting period work on the program is 22.80% complete based upon milestones completed. This measurement is considered quite conservative as numerous drawings on the Mercury 50 are near release. Variance information is provided in Section 4.0-Program Management.

NONE

1997-12-31T23:59:59.000Z

455

FY 93 thermal loading systems study final report: Volume 1. Revision 1  

SciTech Connect

The ability to meet the overall performance requirements for the proposed Mined Geology Disposal System at Yucca Mountain, Nevada requires the two major subsystem (natural barriers and engineered barriers) to positively contribute to containment and radionuclide isolation. In addition to the postclosure performance the proposed repository must meet preclosure requirements of safety, retrievability, and operability. Cost and schedule were also considered. The thermal loading strategy chosen may significantly affect both the postclosure and preclosure performance of the proposed repository. Although the current Site Characterization Plan reference case is 57 kilowatts (kW)/acre, other thermal loading strategies (different areal mass loadings) have been proposed which possess both advantages and disadvantages. The objectives of the FY 1993 Thermal Loading Study were to (1) place bounds on the thermal loading which would establish the loading regime that is ``too hot`` and the loading regime that is ``too cold``, to (2) ``grade`` or evaluate the performance, as a function of thermal loading, of the repository to contain high level wastes against performance criteria and to (3) evaluate the performance of the various options with respect to cost, safety, and operability. Additionally, the effort was to (4) identify important uncertainties that need to be resolved by tests and/or analyses in order to complete a performance assessment on the effects of thermal loading. The FY 1993 Thermal Loading Study was conducted from December 1, 1992 to December 30, 1993 and this final report provides the findings of the study. Volume 1 contains the Introduction; Performance requirements; Input and assumptions; Near-field thermal analysis; Far-field thermal analysis; Cost analysis; Other considerations; System analysis; Additional thermal analysis; and Conclusions and recommendations. 71 refs., 54 figs.

Saterlie, S.F.; Thomson, B.H.

1994-08-29T23:59:59.000Z

456

Assessment of atmospheric fluidized-bed combustion recycle systems. Final report  

SciTech Connect

This report presents a technical and economic evaluation of AFBC power plants with recycle systems, and a comparison of these plants with AFBC power plants with carbon burnup beds (CBB) and with pulverized coal-fired (PCF) power plants with flue gas desulfurization (FGD) systems. The analysis considers 1000 MWe plants burning both eastern and western coals. The capital and operating cost estimates are based on boiler designs developed by Babcock and Wilcox, Inc., and on sorbent requirements estimated by Burns and Roe, Inc. The economic analyses are based on a plant located in the East Central region of the United States with a 30-year life and a 70 percent capacity factor. The eastern coal-fired plants are designed to burn Illinois bituminous coal with a higher heating value of 10,100 Btu/lb and a sulfur content of 4%. The required calcium to sulfur mole ratios for the eastern plants are 3.8:1 and 2.5:1 for the AFBC/CBB and AFBC/recycle plants, respectively. The western coal-fired plants are designed to burn Wyoming subbituminous coal with a higher heating value of 8,020 Btu/lb and a sulfur content of 0.48%. The required calcium to sulfur mole ratios for the western plants are 0.7:1 and 0.4:1 for the AFBC/CBB and AFBC/recycle plants, respectively. These Ca/S mole ratios allow for 30 percent utilization of the alkaline coal ash to reduce sorbent requirements to the fluidized bed combustor. The analyses indicate that the AFBC/recycle plants have an economic advantage over the AFBC/CBB plants and over the PCF/FGD plants for both eastern and western coal.

Rogali, R.; Wysocki, J.; Kursman, S.

1981-10-01T23:59:59.000Z

457

ORNL Superconducting Technology Program for electric power systems: Annual report for FY 1997  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by US industry for commercial development of electric power applications of high temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and developments activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1997 Annual Program Review held July 21--23, 1997. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high temperature superconductor wire and wire-using systems.

Koncinski, W.S.; O`Hara, L.M. [eds.; Hawsey, R.A.; Murphy, A.W. [comps.

1998-03-01T23:59:59.000Z

458

ORNL Superconducting Technology Program for electric power systems. Annual report for FY 1996  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by US industry for commercial development of electric power applications of high temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1996 Annual Program Review held July 31 and August 1, 1996. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high temperature superconductor wire and wire-using systems.

Koncinski, W.S. [ed.; Hawsey, R.A. [comp.

1997-05-01T23:59:59.000Z

459

ORNL Superconducting Technology Program for Electric Energy Systems. Annual report for FY 1992  

SciTech Connect

The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s (DOE`s) Office of Conservation and Renewable Energy to develop the technology base needed by US industry for commercial development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and systems development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1992 Peer Review of Projects, conducted by DOE`s Office of Program Analysis, Office of Energy Research. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer to US industry. Working together, the collaborative teams are making tremendous progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire products.

Hawsey, R.A. [comp.

1993-02-01T23:59:59.000Z

460

Advanced Gas Turbine Systems Research, Technical Quarterly Progress Report. October 1, 1998--December 31, 1998  

SciTech Connect

Major accomplishments during this reporting period by the Advanced Gas Turbine Systems Research (AGTSR) are: AGTSR submitted FY99 program continuation request to DOE-FETC for $4M; AGTSR submitted program and workshop Formation to the Collaborative Advanced Gas Turbine (CAGT) initiative; AGTSR distributed research accomplishment summaries to DOE-FETC in the areas of combustion, aero-heat transfer, and materials; AGTSR reviewed and cleared research papers with the IRB from Arizona State, Cornell, Wisconsin, Minnesota, Pittsburgh, Clemson, Texas and Georgia Tech; AGTSR prepared background material for DOE-FETC on three technology workshops for distribution at the DOE-ATS conference in Washington, DC; AGTSR coordinated two recommendations for reputable firms to conduct an economic impact analysis in support of new DOE gas turbine initiatives; AGTSR released letters announcing the short-list winners/non-winners from the 98RFP solicitation AGTSR updated fact sheet for 1999 and announced four upcoming workshops via the SCIES web page AGTSR distributed formation to EPRI on research successes, active university projects, and workshop offerings in 1999 AGTSR continued to conduct telephone debriefings to non-winning PI's born the 98RFP solicitation AGTSR distributed completed quarterly progress report assessments to the IRB experts in the various technology areas AGTSR provided Formation to GE-Evandale on the active combustion control research at Georgia Tech AGTSR provided information to AlliedSignal and Wright-Pat Air Force Base on Connecticut's latest short-listed proposal pertaining to NDE of thermal barrier coatings AGTSR submitted final technical reports from Georgia Tech - one on coatings and the other on active combustion control - to the HU3 for review and evaluation AGTSR coordinated the format, presentation and review of 28 university research posters for the ATS Annual Review Meeting in November, 1998 AGTSR published a research summary paper at the ATS Annual Review pertaining to the university consortium's activities AGTSR published and presented a paper on the status of ATS catalytic combustion R&D at the RTA/NATO Gas Turbine Combustion Symposium, October 12-16,1998 in Lisbon, Portugal IRE approved a 12-month add-on request from Penn State University to conduct an added research task in their multistage unsteady aerodynamics project AGTSR reviewed a research extension white paper from Clemson University with the IRB to conduct an added task pertaining to their mist/steam cooling research project AGTSR coordinated new research topics with the IR.Band select universities to facilitate R&D roadmapping needs at the Aero-Heat Transfer III workshop in Austin, TX AGTSR distributed FY97 research progress reports to DOE and the XRB; and AGTSR solicited new R&D topics from the IRB experts for the 1999 RFP.

NONE

1999-01-19T23:59:59.000Z

Note: This page contains sample records for the topic "reporting system pars" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

PROCD RAPIDE POUR LA PHOTOMTRIE DES BECS A INCANDESCENCE PAR LE GAZ (1) ;  

E-Print Network (OSTI)

469 PROC�D� RAPIDE POUR LA PHOTOM�TRIE DES BECS A INCANDESCENCE PAR LE GAZ (1) ; Par P. LAURIOL. Les essais des becs à incandescence par le gaz destinés à l'éclai- rage public comportent un très pendant une série de mesures. On emploie une lampe à incandescence électrique dont on #12;471 maintint la

Paris-Sud XI, Université de

462

Analyse Statistique de la Pollution par les PM10 en Haute-Normandie  

E-Print Network (OSTI)

Analyse Statistique de la Pollution par les PM10 en Haute-Normandie Fran¸cois-Xavier Jolloisa travail porte sur l'analyse de la pollution par les particules PM10 en r´egion Haute- Normandie entre 2004´eaires et les m´elanges de mod`eles lin´eaires, on mod´elise les effets des vari- ables sur la pollution par

Boyer, Edmond

463

Fort Bliss Water Distribution System, Fort Bliss, El Paso, Texas, Energy Engineering Analysis Program (EEAP). Final report  

SciTech Connect

The purpose of this study is to analyze the existing system and an alternate method of peak electrical demand shaving for the water distribution system at Fort Bliss, Texas. The existing system will be referred to as Alternative Number 1 throughout the report. Alternative Number 2 includes the addition of water storage capacity in order to allow the well and booster pumps to operate only during non-peak electrical periods. This report is prepared in accordance with the scope of work for Contract No. DACA63-93-M-1259, Purchase Request No. FED-MO-0093-0101 (Refer to Appendix M for complete scope of work) and is a continuation of a report conducted in February, 1993 by Carter Burgess. All pertinent data from the previous report is represented in this report. With the addition of the detailed KY Pipe Analysis. The blast Life Cycle Cost In Design (LCCID) program with the ECIP o