Sample records for reporting system companies

  1. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENERGY POLICY AND SYSTEMS ANALYSIS QUADRENNIAL ENERGY REVIEW STAKEHOLDER...

  2. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    3 05-27-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW STAKEHOLDER MEETING 3 PETROLEUM TRANSMISSION, STORAGE AND DISTRIBUTION ISSUES...

  3. Capital Reporting Company Quadrennial ...

    Broader source: Energy.gov (indexed) [DOE]

    - DEPO www.CapitalReportingCompany.com 2014 1 UNITED STATE OF AMERICA DEPARTMENT OF ENERGY ---: : IN RE: : : QUADRENNIAL ENERGY REVIEW : : NEW...

  4. Capital Reporting Company Quadrennial ...

    Energy Savers [EERE]

    11-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 10: Infrastructure Constraints Monday, August 11, 2014 New Mexico State...

  5. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    07-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 QUADRENNIAL ENERGY REVIEW PUBLIC MEETING 6 MONDAY, JULY 21, 2014 HELD AT: RASHID AUDITORIUM-HILLMAN CENTER...

  6. Capital Reporting Company Quadrenntial ...

    Broader source: Energy.gov (indexed) [DOE]

    Quadrenntial Energy Review 04-21-2014 (866) 448 - DEPO www.CapitalReportingCompany.com 2014 1 NEW ENGLAND REGIONAL INFRASTRUCTURE CONSTRAINTS A Public Meeting on the Quadrennial...

  7. Heat-pump-centered Integrated Community Energy Systems: systems development, Consolidated Natural Gas Service Company. Final report

    SciTech Connect (OSTI)

    Baker, N.R.; Donakowski, T.D.; Foster, R.B.; Sala, D.L.; Tison, R.R.; Whaley, T.P.; Yudow, B.D.; Swenson, P.F.

    1980-01-01T23:59:59.000Z

    The Heat-Actuated Heat Pump Centered Integrated Community Energy System (HAHP-ICES) utilizes a gas-fired, engine-driven, heat pump and commercial buildings, and offers several advantages over the more conventional equipment it is intended to supplant. The general non-site-specific application assumes a hypothetical community of one 59,000 ft/sup 2/ office building and five 24-unit, low-rise apartment buildings located in a region with a climate similar to Chicago. This community serves as a starting point - the base case - upon which various sensitivity analyses are performed and through which the performance characteristics of the HAHP are explored. The results of these analyses provided the selection criteria for the site-specific application of the HAHP-ICES concept to a real-world community. The site-specific community consists of 42 townhouses; five 120-unit, low-rise apartment buildings; five 104-unit high-rise apartment buildings; one 124,000 ft/sup 2/ office building; and a single 135,000 ft/sup 2/ retail building located in Monroeville, Pa. The base-case analyses confirmed that the HAHP-ICES has significant potentials for reducing the primary energy consumption and pollutant emissions associated with space conditioning when compared with a conventional system. Primary energy consumption was reduced by 30%, while emission reductions ranged from 39 to 77%. The results of the site-specific analysis indicate that reductions in energy consumption of between 15 and 22% are possible when a HAHP-ICES is selected as opposed to conventional HVAC equipment.

  8. Intern experience at URS Company: an internship report

    E-Print Network [OSTI]

    Elkarmi, Fawwaz, 1950-

    2013-03-13T23:59:59.000Z

    This report describes the author's internship experience with URS Company - Dallas, Texas, from May 1980 to May 1981. The internship company is a consulting engineering firm engaged in providing professional services...

  9. Dow Chemical Company: Assessment Leads to Steam System Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dow Chemical Company: Assessment Leads to Steam System Energy Savings in a Petrochemical Plant Dow Chemical Company: Assessment Leads to Steam System Energy Savings in a...

  10. New Energy Dept., Berkeley Lab Report on Energy Service Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lawrence Berkeley National Laboratory today released a new report on the market size, trends and growth projections for America's energy service company (ESCO)...

  11. [Tampa Electric Company IGCC project]. Final public design report; Technical progress report

    SciTech Connect (OSTI)

    NONE

    1996-07-01T23:59:59.000Z

    This final Public Design Report (PDR) provides completed design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the operating parameters and benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. Pending development of technically and commercially viable sorbent for the Hot Gas Cleanup System, the HGCU also is demonstrated. The report is organized under the following sections: design basis description; plant descriptions; plant systems; project costs and schedule; heat and material balances; general arrangement drawings; equipment list; and miscellaneous drawings.

  12. North Wind Power Company 2-kilowatt high-reliability wind system. Phase I. Design and analysis. Technical report

    SciTech Connect (OSTI)

    Mayer, D J; Norton, Jr, J H

    1981-07-01T23:59:59.000Z

    Results are presented of Phase I of a program to design a 2kW high reliability wind turbine for use in remote locations and harsh environments. In phase I of the program, a predecessor of the proposed design was procured and tested in a wind tunnel and in the freestream to observe operational characteristics. An analytical procedure was developed for designing and modelling the proposed variable axis rotor control system (VARCS). This was then verified by extensive mobile testing of pre-prototype components. A low speed three phase alternator with a Lundel type rotor was designed. Prototypes were fabricated and tested to refine calculation procedures and develop an effective alternator with appropriate characteristics. A solid state field switching regulator was designed and tested successfully. All necessary support elements were designed and engineered. A complete analysis of system reliability was conducted including failure mode and effects analyses and reliability, maintenance and safety analyses. Cost estimates were performed for a mature product in production rates of 1000 per year. Analysis and testing conducted throughout the first phase is included.

  13. Interim activities report. [Westinghouse Savannah River Company

    SciTech Connect (OSTI)

    Majzlik, E.H. Jr.

    1992-01-01T23:59:59.000Z

    Several developments have occurred since the 32nd WANTO Meeting that effect the status of the Savannah River Site. A request to restart K-Reactor was issued after nearly three years of intensive engineering analysis, procedure revisions and enhanced operator training to upgrade all aspects of reactor operation. In early December 1991, the Westinghouse Savannah River Company requested permission from DOE to start the K-Reactor. In mid-December the DOE and the Defense Nuclear Facility Safety Board concurred with readiness to operate and a Federal Circuit Court of Appeals ruled against a lawsuit to delay restart until a cooling tower is completed. The K-Reactor was restarted and has been in an evaluation and testing mode. Full power operation at thirty percent of maximum capacity is projected for March 1992 after which actual tritium generation will begin. Operation will continue until October when the cooling tower will be tied into the reactor cooling system. In conjunction with the restart of K-Reactor, the P-Reactor has been placed in permanent shutdown status and the L-Reactor has been placed in warm stand-by. In another reactor related situation, the DOE will delay the decision on construction of the New Production Reactor (NPR) until 1993. The choice of reactor type and location of the NPR will be integrated into the overall programmatic decision on Reconfiguration of the Weapons Complex. Finally, construction of the Replacement Tritium Facility (RTF) was resumed in December 1991 after several months stoppage for evaluation and revision of project funding procedures.

  14. UoS Motor Accident Report Form COMPANY DETAILS

    E-Print Network [OSTI]

    Sussex, University of

    UNIV01FL02 UoS Motor Accident Report Form COMPANY DETAILS INSURED: University of Sussex ADDRESS: LOCATION: DESCRIPTION OF HOW ACCIDENT HAPPENED: PLEASE DRAW A SKETCH OF THE ACCIDENT: #12;DRIVER DETAILS: PREVIOUS ACCIDENTS: ADDRESS: VEHICLE DETAILS DATE VEHICLE PURCHASED: MAKE/MODEL: REGISTRATION: MILEAGE

  15. Internet Security Systems, an IBM Company Threat Insight Monthly

    E-Print Network [OSTI]

    Internet Security Systems, an IBM Company X-Force ® Threat Insight Monthly www . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Contents www.iss.netwww.iss.net Internet Security Systems, an IBM Company X-Force Threat Insight Monthly April 2007 #12;X-Force® Threat Insight Monthly > April 2007 www.iss.netwww.iss.net About

  16. An Analysis of the Effectiveness and Impact of Mandatory Company Greenhouse Gas Emission Reporting Under The Companies Act 2006 (Strategic Report and Directors’ Report) Regulations 2013 

    E-Print Network [OSTI]

    Plaza, Celina

    2014-11-22T23:59:59.000Z

    The intent of this research is to examine the effectiveness and impact of the UK’s mandatory reporting of company greenhouse gas emissions, otherwise known as carbon dioxide equivalent (CO2e) emissions, in accordance to ...

  17. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    SciTech Connect (OSTI)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23T23:59:59.000Z

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  18. Intern experience at the General Electric Company: an internship report

    E-Print Network [OSTI]

    Aucoin, Bruce Michael, 1954-

    2013-03-13T23:59:59.000Z

    OF ENGINEERING December 1982 Major Subject: E lec t r ica l Engineering INTERN EXPERIENCE AT THE GENERAL ELECTRIC COMPANY An Internship Report by Bruce Michael Aucoin Approved as to sty le and content by: ^ 'B. D. Russell Chairman, Advisory Committee... 'iQ. s t a W.B. Jones Head, E lec t r ica l Engineering ? Member N.R. Strader Member P.A. Schniej3 r^x fnternship Supervisor T.W. Comstock College of Engineering Representati ve i Q . R.H. Page Dean of Engineering December 1982...

  19. Joint Maintenance Status Report of Potomac Electric Power Company...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance...

  20. Tampa Electric Company Polk Power Station Unit Number 1. Annual report, January--December, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year`s activities associated with Tampa Electric Company`s 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.

  1. Solar heating, cooling, and domestic hot water system installed at Kaw Valley State Bank and Trust Company, Topeka, Kansas. Final report

    SciTech Connect (OSTI)

    None

    1980-11-01T23:59:59.000Z

    The building has approximately 5600 square feet of conditioned space. Solar energy is used for space heating, space cooling, and preheating domestic hot water (DHW). The solar energy system has an array of evacuated tube-type collectors with an area of 1068 square feet. A 50/50 solution of ethylene glycol and water is the transfer medium that delivers solar energy to a tube-in-shell heat exchanger that in turn delivers solar-heated water to a 1100 gallon pressurized hot water storage tank. When solar energy is insufficient to satisfy the space heating and/or cooling demand, a natural gas-fired boiler provides auxiliary energy to the fan coil loops and/or the absorption chillers. Extracts from the site files, specification references, drawings, and installation, operation and maintenance instructions are included.

  2. Getting along with reporters, environmentalists, and regulators: How to get your company`s message on the air

    SciTech Connect (OSTI)

    Pearson, A. [Mitchell Energy & Development Corp., Woodlands, TX (United States)

    1994-12-31T23:59:59.000Z

    Oil and gas companies continue to get clobbered with expensive and punishing environmental regulations and drilling bans because they have done a poor job of convincing the public, the press, and the government that their operating practices are environmentally safe. The oil industry also continues to be perceived of as arrogant and secretive, which only aggravates its problems. Smart operators must learn to balance profitable development with earth-friendliness. They also must learn to tell their story more effectively and openly, not just through big trade groups like the API and IPAA, but as individual small businessmen working to improve the economies and job bases of their local communities. That means being more forthcoming with next-door neighbors and environmental groups, befriending local and national reporters who cover their companies, and fine-tuning messages and communications skills. Companies also can improve their images and, ideally, lighten their regulatory burdens by thinking of creative, win-win solutions to environmental problems their projects create. One company, for example, solved the problem of where to dump offshore channel dredging waste by creating a new island off South Texas with a carefully planted habitat that last year attracted a pair of endangered whooping cranes. State regulators loved it, it cost very little, and the press coverage was extremely positive.

  3. Getting along with reporters, environmentalists, and regulators: how to get your company`s message on the air

    SciTech Connect (OSTI)

    Pearson, A. [Mitchell Energy & Development Corp., Woodlands, TX (United States)

    1994-09-01T23:59:59.000Z

    Oil and gas companies continue to get clobbered with expensive and punishing environmental regulations and drilling bans because they have done a poor job of convincing the public, the press, and the government that their operating practices are environmentally safe. The oil industry also continues to be perceived as arrogant and secretive, which only aggravates its problems. Smart operators must learn to balance profitable development with earth-friendliness. They also must learn to tell their story more effectively and openly, not just through big trade groups like the API and IPAA, but as individual small businessmen working to improve the economies and job bases of their local communities. That means being more forthcoming with next-door neighbors and environmental groups, befriending local and national reporters who cover their companies, and fine-tuning messages and communications skills. Companies also can improve their image and hopefully lighten their regulatory burden by thinking up creative, win-win solutions to environmental problems their projects create. One company solved the problem of where to dump offshore channel dredging waste, for example, by creating a new island off south Texas with a carefully planted habitat that last year attracted a pair of endangered whooping cranes. State regulators loved it, it cost very little, and the press coverage was extremely positive.

  4. Intern experience at Gulf States Utility Company: an internship report

    E-Print Network [OSTI]

    Laub, Thomas William, 1958-

    2013-03-13T23:59:59.000Z

    DON'T WANT TO BE AN ENGINEER; YOU WANT TO BE A DOCTOR, OR A DENTIST, OR A . . . 1 AND TO MY WIFE, JULIE, WHO ALWAYS SAYS: "ENGINEERS ARE WEIRD." ACKNOWLEDGEMENTS I would like to express my gratitude to my committee members Dr. R. S. Wick, Dr. G.............................................. ix LIST OF FIGURES......................................... x SECTION I. INTRODUCTION........... ....................... 1 General............. ................................ 1 Gulf States Utilities Company ........................ 2 In...

  5. Office of Inspector General audit report on Westinghouse Savannah River Company`s health benefit plan

    SciTech Connect (OSTI)

    NONE

    1999-01-01T23:59:59.000Z

    Westinghouse Savannah River Company (Westinghouse) manages and operates the Savannah River Site, located in Aiken, South Carolina, for the US Department of Energy (Department). Westinghouse was self-insured for health benefits and contracted with Aetna Insurance to administer the plan (service payments to providers) from Calendar Year (CY) 1989 through 1996. Westinghouse`s administrative service contract with Aetna Insurance expired on December 31, 1996. Westinghouse chose Blue Cross/Blue Shield of South Carolina (BC/BS) to administer its health plan, effective January 1, 1997. After the contract was awarded to BC/BS, 47 health care providers in the Aiken area submitted their resignations as preferred providers for BC/BS. The health care providers complained that the fees received from BC/BS were less than they were previously paid through Aetna Insurance. As a result, Westinghouse instructed BC/BS to negotiate a modified fee schedule for all the health care providers in the Aiken area. The audit objective was to determine whether the health benefit costs incurred by Westinghouse under the BC/BS contract were necessary and reasonable.

  6. Westinghouse Hanford Company health and safety performance report

    SciTech Connect (OSTI)

    Rogers, L.

    1996-05-15T23:59:59.000Z

    Topping the list of WHC Safety recognition during this reporting period is a commendation received from the National Safety Council (NSC). The NSC bestowed their Award of Honor upon WHC for significant reduction of incidence rates during CY 1995. The award is based upon a reduction of 48 % or greater in cases involving days away from work, a 30 % or greater reduction in the number of days away, and a 15% or greater reduction in the total number of occupational injuries and illnesses. (page 2-1). A DOE-HQ review team representing the Office of Envirorunent, Safety and Health (EH), visited the Hanford Site during several weeks of the quarter. Ile 40-member Safety Management Evaluation Team (SMET) assessed WHC in the areas of management responsibility, comprehensive requirements, and competence commensurate with responsibility. As part of their new approach to oversight, they focused on the existence of management systems and programs (comparable approach to VPP). Plant/project areas selected for review within WHC were PFP, B Plant/WESF, Tank Farms, and K-Basins (page 2-2). Effective safety meetings, prejob safety meetings, etc., are a cornerstone of any successful safety program. In an effort to improve the reporting of safety meetings, the Safety/Security Meeting Report form was revised. It now provides a mechanism for recording and tracking safety issues (page 2-4). WHC has experienced an increase in the occupational injury and illness incidence rates during the first quarter of CY 1996. Trends show this increase can be partially attributed to inattention to workplace activities due 0999to the uncertainty Hanford employees currently face with recent reduction of force, reorganization, and reengineering efforts (page 2-7). The cumulative CY 1995 lost/restricted workday case incidence rate for the first quarter of CY 1996 (1.28) is 25% below the DOE CY 1991-93 average (1.70). However, the incidence rate increased 24% from the CY 1995 rate of 1.03 (page 2-8). The reengineering of the Radiological Control organization has resulted in an increase in the availability of personnel to help facilities with the procurement and use of practical ALARA measures. In addition, there seems to be more awareness of the need to use ALARA, resulting in a significant increase in the number of calls received by the ALARA Program Office for help in solving radiological problems (page 1-3). The Figure 3-2-1 chart data includes WHC, BCSR, and ICF KH employee exposure. The first quarter CY 1996 results represent the exposure of 1,913 quarterly-badged employees and an average of 846 monthly-badged employees. There were three instances of potential loss of contamination control during the calendar quarter involving three workers where internal dosimetry follow-up was performed. No intakes of contamination were detected (page 3-6). There were five skin contaminations and 18 clothing contaminations reported during this quarter in all WHC-managed facilities/areas. This represents an improvement in performance compared to the first quarter of CY 1995 (page 3-9). A monthly average of 76 Radiological Problem Reports (RPR) was issued during the first quarter of CY 1996 for a total issuance of 227 RPRS. The monthly average for the same quarter in CY 1995 was 76; a total of 228 for the quarter (Figure 3-5-1). At the end of March, WHC Dosimetry was monitoring the following employees/sub- contractors: 631 monthly standard dosimeters, 251 monthly combination dosimeters, 1,386 quarterly standard dosimeters, 472 quarterly combination dosimeters, and 3,716 annual dosimeters. During this period, Dosimetry had 987 requests for changes to the frequency, and terminated 731 dosimetry records.

  7. Health-hazard evaluation report HETA-86-053-1933, Gray Pprinting Company, Fostoria, Ohio

    SciTech Connect (OSTI)

    Crandall, M.S.; Boiano, J.M.; Fidler, A.T.; Cantor, F.

    1988-10-01T23:59:59.000Z

    The Gray Printing Company, located in Fostoria, Ohio was studied for potential employee exposures to solvents used in the offset-printing process at that site. The company produced 30 monthly magazines plus various commercial catalogs and brochures. The employment at the site was 185 persons. Equipment used in the production of printed material included photographic-typesetting and sheet-fed and roll fed offset lithographic printing processes. Over two workdays the sheet fed press operator's isopropanol exposures ranged from 247 to 501 mg/m/sup 3/ with personal breathing zone naphtha concentrations of 0.03 to 8.9 mg/m/sup 3/. The web press operator's naphtha exposures ranged from 0.03 to 7.7 mg/m/sup 3/. These workers were also exposed to low concentrations of isopropanol. The highest short term isopropanol exposure was 726 mg/m/sup 3/. Short term exposures to blanket and roller cleaning solvent were low, less than 10 mg/m/sup 3/. A higher than expected reporting of symptoms related to central nervous system depression, difficulty in concentrating, dizziness, cough, chest pain, and dry skin were noted among workers. The authors conclude that there was an increased prevalence of neurotoxic, respiratory, and skin problems among workers using organic solvents. Due to the prevalence of these symptoms, the authors recommend measures for reducing employee exposure to solvents.

  8. Westinghouse Hanford Company operational environmental monitoring annual report, CY 1992

    SciTech Connect (OSTI)

    Schmidt, J.W.; Johnson, A.R.; McKinney, S.M.; Perkins, C.J.

    1993-07-01T23:59:59.000Z

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1992 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State in 1992. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and to control the impacts of nuclear facilities and waste sites on the workers and the local environment. Additionally, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although impacts from nuclear facilities are still seen on the Hanford Site and are slightly elevated when compared to offsite, these impacts are less than in previous years.

  9. Assembly of radioisotope power systems at Westinghouse Hanford Company

    SciTech Connect (OSTI)

    Alderman, C.J.

    1990-04-01T23:59:59.000Z

    Long-term space flight requires reliable long-term power sources. For the purpose of supplying a constant supply of power in deep space, the radioisotope thermoelectric generator has proven to be a successful power source. Westinghouse Hanford Company is installing the Radioisotope Power Systems Facility which is located in the Fuels and Material Examination Facility on the Hanford Site near Richland, Washington, for assembling the generators. The radioisotope thermoelectric generator assembly process is base upon one developed at Mound Laboratory in Miamisburg, Ohio (presently operated by EG G Mound Applied Technologies). Westinghouse Hanford Company is modernizing the process to ensure the heat source assemblies are produced in a manner that maximizes operator safety and is consistent with today's environmental and operational safety standards. The facility is being prepared to assemble the generators required by the National Aeronautics and Space Administration missions for CRAF (Comet Rendezvous Asteroid Flyby) in 1995 and Cassini, an investigation of Saturn and its moons, in 1996. The facility will also have the capability to assemble larger radioisotope power generators designed for dynamic power generation. 4 refs., 11 figs.

  10. Abstract: With power market deregulation, member companies cooperate to share one whole grid system and try to achieve their

    E-Print Network [OSTI]

    1 Abstract: With power market deregulation, member companies cooperate to share one whole grid, in a deregulated environment, no single company owns the whole system. There are multiple member companies who must

  11. Westinghouse Hanford Company Operational Groundwater status report, 1990--1992

    SciTech Connect (OSTI)

    Johnson, V.G.

    1993-03-01T23:59:59.000Z

    This report presents information related to the water quality of ground water at the Hanford Reservation. Included are plume maps, geology, hydrology, and information on various effluent sources.

  12. Intern experience at the General Electric Company: an internship report 

    E-Print Network [OSTI]

    Aucoin, Bruce Michael, 1954-

    2013-03-13T23:59:59.000Z

    'iQ. s t a W.B. Jones Head, E lec t r ica l Engineering ? Member N.R. Strader Member P.A. Schniej3 r^x fnternship Supervisor T.W. Comstock College of Engineering Representati ve i Q . R.H. Page Dean of Engineering December 1982... ......................................................... ..... 67 Final Reports......................................................................... ..... 67 Time Overcurrent Algorithm Evaluation.............................. 68 Event Recorder Preliminary Product D e sc r ip t io n . . . . 69 viii...

  13. Company Name: Allegro MicroSystems, Inc. Web Site: www.allegromicro.com

    E-Print Network [OSTI]

    New Hampshire, University of

    Company Name: Allegro MicroSystems, Inc. Web Site: www.allegromicro.com Industry: Semiconductor Brief Company Overview: Allegro MicroSystems, Inc. is a leader in developing, manufacturing and marketing high- performance power and Hall-effect sensor integrated circuits. Allegro's innovative solutions

  14. Report on energy trends in the 90`s -- Implications for company strategies

    SciTech Connect (OSTI)

    NONE

    1992-12-31T23:59:59.000Z

    This report summarizes the content of the conference held on May 6--8, 1992, in Dallas, Texas. Three panel discussions were held on international issues and outlook: Emerging trends in Latin America; Update on the former Soviet Union; and Balancing world energy markets. The sessions on company strategies and perspectives included presentations by Enserch Corp., Union Pacific Resources, Union Texas Petroleum Holdings, Inc., and Triton Energy Corp. These sessions included the current position of the company, problems with development of specific fields, sharing the risks of exploratory drilling, commitment to domestic exploration, and international ventures in exploration.

  15. Natural gas annual 1993 supplement: Company profiles

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The Natural Gas Annual provides information on the supply and disposition of natural gas to a wide audience including industry, consumers, Federal and State agencies, and educational institutions. This report, the Natural Gas Annual 1993 Supplement: Company Profiles, presents a detailed profile of 45 selected companies in the natural gas industry. The purpose of this report is to show the movement of natural gas through the various States served by the companies profiled. The companies in this report are interstate pipeline companies or local distribution companies (LDC`s). Interstate pipeline companies acquire gas supplies from company owned production, purchases from producers, and receipts for transportation for account of others. Pipeline systems, service area maps, company supply and disposition data are presented.

  16. Evaluation of Gas Reburning & Low NOx Burners on a Wall Fired Boiler Performance and Economics Report Gas Reburning-Low NOx Burner System Cherokee Station Unit 3 Public Service Company of Colorado

    SciTech Connect (OSTI)

    None

    1998-07-01T23:59:59.000Z

    Under the U.S. Department of Energy's Clean Coal Technology Program (Round 3), a project was completed to demonstrate control of boiler NOX emissions and to a lesser degree, due to coal replacement, SO2 emissions. The project involved combining Gas Reburning with Low NOX Burners (GR-LNB) on a coal-fired electric utility boiler to determine if high levels of NOX reduction (70%) could be achieved. Sponsors of the project included the U.S. Department of Energy, the Gas Research Institute, Public Service Company of Colorado, Colorado Interstate Gas, Electric Power Research Institute, and the Energy and Environmental Research Corporation. The GR-LNB demonstration was performed on Public Service Company of Colorado's (PSCO) Cherokee Unit #3, located in Denver, Colorado. This unit is a 172 MW~ wall-fired boiler that uses Colorado Bituminous, low-sulfur coal. It had a baseline NOX emission level of 0.73 lb/106 Btu using conventional burners. Low NOX burners are designed to yield lower NOX emissions than conventional burners. However, the NOX control achieved with this technique is limited to 30-50%. Also, with LNBs, CO emissions can increase to above acceptable standards. Gas Reburning (GR) is designed to reduce NOX in the flue gas by staged fuel combustion. This technology involves the introduction of natural gas into the hot furnace flue gas stream. When combined, GR and LNBs minimize NOX emissions and maintain acceptable levels of CO emissions. A comprehensive test program was completed, operating over a wide range of boiler conditions. Over 4,000 hours of operation were achieved, providing substantial data. Measurements were taken to quantify reductions in NOX emissions, the impact on boiler equipment and operability and factors influencing costs. The GR-LNB technology achieved good NOX emission reductions and the goals of the project were achieved. Although the performance of the low NOX burners (supplied by others) was less than expected, a NOX reduction of 65% was achieved at an average gas heat input of 18Y0. The performance goal of 70% reduction was met on many test runs, but at a higher reburn gas heat input. S02 emissions, based on coal replacement, were reduced by 18Y0. The performance goal of 70% reduction was met on many test runs, but at a higher reburn gas heat input. S02 emissions, based on coal replacement, were reduced by 18Y0. Toward the end of the program, a Second Generation gas injection system was installed. Higher injector gas pressures were used that eliminated the need for flue gas recirculation as used in the first generation design. The Second Generation GR resulted in similar NOX reduction performance as that for the First Generation. With an improvement in the LNB performance in combination with the new gas injection system , the reburn gas could be reduced to 12.5% of the total boiler heat input to achieve al 64?40 reduction in NO, emissions. In addition, the OFA injectors were modified to provide for better mixing to lower CO emissions.

  17. Westinghouse Hanford Company effluent report for 300, 400, and 1100 Area operations for calendar year 1989

    SciTech Connect (OSTI)

    McCarthy, M.J.

    1990-09-01T23:59:59.000Z

    The report tabulates both radioactive and nonradioactive liquid and airborne effluent data for 300, 400, and 1100 Area operations at the Hanford Site. The 300 Area is primarily a research and development area. The 400 Area houses the Fast Flux Test Facility. The 1100 Area contains central stores and vehicle maintenance facilities. Releases to the environment from Westinghouse Hanford Company operations within these areas during calendar year 1989 were both consistent with previous years and within regulatory limits. 2 refs., 10 tabs.

  18. Interim operations report for atmospheric fluidized-bed combustion conversion at Northern States Power Company

    SciTech Connect (OSTI)

    Thimsen, D. (Hamilton Maurer International, Inc., Falcon Heights, MN (USA))

    1991-03-01T23:59:59.000Z

    Northern States Power Company converted its Black Dog Station Unit No. 2 boiler from a front wall fired pulverized coal boiler to a bubbling atmospheric fluidized bed combustor (AFBC) boiler. The resulting unit was uprated from 85 MWe to 130 MWe burning western subbituminous coal. This report describes the AFBC operating and maintenance experience in the startup period from initial operation in June 1986 through March 1989 when a turbine oil fire caused a forced outage of 8 months. A brief review of the construction history is given in Section 1. Section 2 chronicles the AFBC operation. Section 3 describes how the boiler is restarted under several conditions. The performance history of the systems in the AFBC that are peculiar to the AFBC process or directly impacted by the AFBC process are described in detail in Section 4. The AFBC conversion at the Black Dog station has met nearly all of the original design objectives: (1) The unit can operate at rated output of 130 MWe burning western subbituminous coal, (2) The design life of the unit has been extended 25 years, (3) It has been shown that the EPA New Source Performance Standards for NO{sub x} and SO{sub 2} can be met with no flue gas treatment, (4) Operators have conducted over 200 routine daily unit restarts confirming the ability of the unit to serve in daily cycling mode, and (5) A variety of fuels have been successfully burned in the AFBC. The only objective that remains partially achieved is routine operation at full load. The boiler/turbine/generator have been shown to be fully capable of operation at full load, but the electrostatic precipitators (which were largely unchanged during the retrofit) have been inadequate to allow full load operation while remaining within permitted opacity and particulate emissions. The unit is currently dispatched in daily cycling service and is limited to operation below 106 MWe by its emissions control permit. 12 refs., 34 figs., 6 tabs.

  19. Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne

    SciTech Connect (OSTI)

    None

    2000-09-01T23:59:59.000Z

    OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

  20. Independent Activity Report, CH2M Hill Plateau Remediation Company- January 2011

    Broader source: Energy.gov [DOE]

    Review of the CH2M Hill Plateau Remediation Company Unreviewed Safety Question Procedure [ARPT-RL-2011-003

  1. Automated Energy Distribution and Reliability System (AEDR): Final Report

    SciTech Connect (OSTI)

    Buche, D. L.

    2008-07-01T23:59:59.000Z

    This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects.

  2. Report on a Fatal Accident and Fire at the West London Terminal of Esso Petroleum Company Limited on 1st April, 1967 

    E-Print Network [OSTI]

    Black, H. K.

    1968-01-01T23:59:59.000Z

    A12.P46 Report on a Fatal Accident and Fire at the West London Terminal of Esso Petroleum Company Limited on 1st April, 1967...

  3. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    SciTech Connect (OSTI)

    NONE

    1997-12-31T23:59:59.000Z

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  4. Integrated system checkout report

    SciTech Connect (OSTI)

    Not Available

    1991-08-14T23:59:59.000Z

    The planning and preparation phase of the Integrated Systems Checkout Program (ISCP) was conducted from October 1989 to July 1991. A copy of the ISCP, DOE-WIPP 90--002, is included in this report as an appendix. The final phase of the Checkout was conducted from July 10, 1991, to July 23, 1991. This phase exercised all the procedures and equipment required to receive, emplace, and retrieve contact handled transuranium (CH TRU) waste filled dry bins. In addition, abnormal events were introduced to simulate various equipment failures, loose surface radioactive contamination events, and personnel injury. This report provides a detailed summary of each days activities during this period. Qualification of personnel to safely conduct the tasks identified in the procedures and the abnormal events were verified by observers familiar with the Bin-Scale CH TRU Waste Test requirements. These observers were members of the staffs of Westinghouse WID Engineering, QA, Training, Health Physics, Safety, and SNL. Observers representing a number of DOE departments, the state of new Mexico, and the Defense Nuclear Facilities Safety Board observed those Checkout activities conducted during the period from July 17, 1991, to July 23, 1991. Observer comments described in this report are those obtained from the staff member observers. 1 figs., 1 tab.

  5. International Journal of Uncertainty, Fuzziness and KnowledgeBased Systems c World Scientific Publishing Company

    E-Print Network [OSTI]

    Kreinovich, Vladik

    Publishing Company INTERVAL­VALUED DEGREES OF BELIEF: APPLICATIONS OF INTERVAL COMPUTATIONS TO EXPERT SYSTEMS doctors successfully cure diseases; expert geologists find oil; expert astronauts know how to dock the experts in the field, there are a few top experts whose deci­ sions turn out to be the most efficient

  6. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems fc World Scientific Publishing Company

    E-Print Network [OSTI]

    Kreinovich, Vladik

    Publishing Company INTERVAL-VALUED DEGREES OF BELIEF: APPLICATIONS OF INTERVAL COMPUTATIONS TO EXPERT SYSTEMS successfully cure diseases; expert geologists find oil; expert astronauts know how to dock and land the Space in the field, there are a few top experts whose deci- sions turn out to be the most efficient. Since

  7. Review your system access with your company's Information Security Officer. Access that is not

    E-Print Network [OSTI]

    Shepp, Larry

    Review your system access with your company's Information Security Officer. Access and downloading of information from laptop computers. Beware that your conversations may not be private or secure to be someone you trust in order to obtain personal or sensitive information. Additional travel security tips

  8. Health-hazard evaluation report HETA 88-391-2156, Morton Salt Company, Weeks Island, Louisiana

    SciTech Connect (OSTI)

    Ferguson, R.P.; Knutti, E.B.

    1991-11-01T23:59:59.000Z

    In response to a request from the International Chemical Workers Union, project director, an evaluation was undertaken of possible hazardous working conditions at the Morton Salt Company (SIC-1479), Weeks Island, Louisiana. At Weeks Island the salt was mined from large domes, circular in shape and from a few hundred yards to a mile across. The only detectable overexposures in the mining operation were to coal-tar pitch volatiles. None of the 20 personal breathing zone and area air samples collected in the mill were above detectable limits for asbestos (1332214). The prevalences of chronic cough and chronic phlegm reported were statistically different, exceeding those reported by a group of nonexposed blue collar workers. Chronic symptoms were reported by underground workers in all smoking categories, but only by those surface workers who also smoked. There were more complaints about eye irritation and tearing of the eyes in the underground workers, consistent with diesel byproduct exposure. Four workers were identified through pulmonary function test results with mild obstructive lung disease and one with moderate obstructive lung disease. Three workers with mild restriction of lung volume were noted. None of the 61 chest films taken read positively for pneumoconiosis. The authors conclude that overexposures to coal-tar pitch volatiles existed at the time of the survey. The authors recommend measures for reducing occupational exposures to workplace contaminants. A follow up medical questionnaire survey should be conducted.

  9. NERSC System Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reports Usage Reports Batch Job Statistics See queue wait times, hours used, top users and other summary statistics for jobs run at NERSC (login required). Read More Parallel...

  10. Summary Report for Contract 330088-A-T9: Procurement of Zircaloy-4 Products from Superior Tube Company

    SciTech Connect (OSTI)

    Graves, Roger E.

    2007-06-27T23:59:59.000Z

    This report documents the initial procurement activities from the Superior Tube Company associated with production quantities of Zircaloy 4 components (Contract 330088-A-T9) and the demonstration of their capability to produce full-length getter components (Contract 406957-A-T5).

  11. 2010 U.S. Smart Grid Vendor Ecosystem Report on the companies...

    Energy Savers [EERE]

    smart grid landscape The Smart Grid vendor ecosystem is an increasingly interdependent web of companies. Vendors of Advanced Metering Infrastructure (AMI) products (meters,...

  12. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 4. Leakage

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Bruni, J.; Crebs, S.; Law, E.

    1993-04-01T23:59:59.000Z

    As part of a study of unaccounted-for gas (UAF) at the Southern California Gas Company (SoCalGas), volume IV of the six-volume set reports on the UAF leakage volumes associated with the transmission and distribution piping systems, each analyzed separately. Unplanned gas releases in SoCalGas distribution and transmission operations contributed approximately 871,900 thousand cubic feet to the 1991 UAF volume. The study indicated that SoCalGas' current leak detection program has been successful in reducing the number of leaks throughout the distribution system, with the sensitive detection equipment finding leaks earlier in their development and reducing the average leakage rate.

  13. Distributed Energy Systems in California's Future: A Preliminary Report Volume 2

    E-Print Network [OSTI]

    Balderston, F.

    2010-01-01T23:59:59.000Z

    4 utility companies hardware store solar equipment companiesequipment? utility company hardware store solar equipmentsecure if a utility company installed a solar heating system

  14. Exploring the Forecasting Potential of Company Annual Reports Xin Ying Qiu

    E-Print Network [OSTI]

    Street, Nick

    features can be further studied to understand their roles as indicators of company's future performance that is as useful as the financial ratios to financial analysts while predicting the company's future prospects changes, reasons for revenue and cost changes, planned expenditures, known trends, and future liquidity

  15. Site Environmental Report for Calendar Year 2003 DOE Operations at The Boeing Company, Rocketdyne Propulsion & Power

    SciTech Connect (OSTI)

    Liu, Ning; Rutherford, Phil; Samuels, Sandy; Lee, Majelle

    2004-09-30T23:59:59.000Z

    This Annual Site Environmental Report (ASER) for 2003 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing Rocketdyne’s Santa Susana Field Laboratory (SSFL). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2003 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling.

  16. Westinghouse Hanford Company Health and Safety Performance Report. First quarter calendar year 1995

    SciTech Connect (OSTI)

    Lansing, K.A.

    1995-05-01T23:59:59.000Z

    During the first quarter of CY 1995, four of the WHC sitewide ALARA performance goals were completed on or ahead of schedule. One of the completed goals related to reduction of radiological areas at WHC-managed facilities. Due to anticipated resource reductions and increased scope of work, several facilities escalated their reduction schedule. This allowed the ALARA goal to be completed and exceeded ahead of schedule. Industrial Safety and Health initiatives are being pursued in areas such as workplace ergonomics, safety training, and standards development. Positive efforts are ongoing in the areas of management commitment and employee involvement through the WHC Voluntary Protection Program. Successful implementation continues through the President`s Accident Prevention Council (PAPC) and division employee Accident Prevention Councils. The Company now has established CY 1995 PAPC goals. Major programmatic accomplishments completed during this reporting period include the Department of Energy-Headquarters (DOE-HQ) formally endorsing the Radiological Control organization`s approach toward development of the Radiation Protection Program (RPP) document. The DOE-HQ has recognized the significant contributions and leadership that Radiological Control has provided in planning and implementation of this ``model example of an RPP`` across the DOE complex and is encouraging other sites to contact WHC for assistance in developing their RPPs.

  17. Westinghouse Hanford Company safety analysis reports and technical safety requirements upgrade program

    SciTech Connect (OSTI)

    Busche, D.M.

    1995-09-01T23:59:59.000Z

    During Fiscal Year 1992, the US Department of Energy, Richland Operations Office (RL) separately transmitted the following US Department of Energy (DOE) Orders to Westinghouse Hanford Company (WHC) for compliance: DOE 5480.21, ``Unreviewed Safety Questions,`` DOE 5480.22, ``Technical Safety Requirements,`` and DOE 5480.23, ``Nuclear Safety Analysis Reports.`` WHC has proceeded with its impact assessment and implementation process for the Orders. The Orders are closely-related and contain some requirements that are either identical, similar, or logically-related. Consequently, WHC has developed a strategy calling for an integrated implementation of the three Orders. The strategy is comprised of three primary objectives, namely: Obtain DOE approval of a single list of DOE-owned and WHC-managed Nuclear Facilities, Establish and/or upgrade the ``Safety Basis`` for each Nuclear Facility, and Establish a functional Unreviewed Safety Question (USQ) process to govern the management and preservation of the Safety Basis for each Nuclear Facility. WHC has developed policy-revision and facility-specific implementation plans to accomplish near-term tasks associated with the above strategic objectives. This plan, which as originally submitted in August 1993 and approved, provided an interpretation of the new DOE Nuclear Facility definition and an initial list of WHC-managed Nuclear Facilities. For each current existing Nuclear Facility, existing Safety Basis documents are identified and the plan/status is provided for the ISB. Plans for upgrading SARs and developing TSRs will be provided after issuance of the corresponding Rules.

  18. Health-hazard evaluation report MHETA 89-009-1990, Consolidation Coal Company, Humphrey No. 7 Mine, Pentress, West Virginia

    SciTech Connect (OSTI)

    Kullman, G.J.

    1989-09-01T23:59:59.000Z

    An evaluation was made of worker exposure to hydraulic fluid used on the longwall-mining operations at Consolidated Coal Company's Humphrey Number 7 Mine, Pentress, West Virginia. Employees were complaining of headache, eye and throat irritation, congestion, and cough. A particular emulsion oil, Solcenic-3A, was used with water in the mine's hydraulic roof-support system. An analysis of the oil indicated the presence of methyl-isobutyl-carbinol (MIBC), dipropylene glycol, and paraffin hydrocarbons. Personal breathing-zone samples for MIBC were collected from all workers on the longwall mining operation during the two days of the visit. All the analysis indicated concentrations of MIBC below the limit of quantification, which was 0.6 parts per million for an 8 hour sample. These levels were well below the exposure recommendations of the Mine Safety and Health Administration. Exposure to MIBC may be occurring through skin contact with oil through hydraulic line leaks, accidents, and maintenance activity on the hydraulic machines. The report concludes that Solcenic-3A oil constituents in air did not pose a health hazard at the time of the survey.

  19. Improving inventory and production control in an electronic company : capacity planning, base stock policy, and Kanban system

    E-Print Network [OSTI]

    Dong, Youqun, M. Eng. Massachusetts Institute of Technology.

    2009-01-01T23:59:59.000Z

    This research developed improved methods of inventory and production control in an electronic manufacturing company, which faces fluctuating seasonal demands and is categorized as a multiple part type production system ...

  20. (Data in kilograms of gallium content unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 2005. One company in Utah

    E-Print Network [OSTI]

    66 GALLIUM (Data in kilograms of gallium content unless otherwise noted) Domestic Production, [(703) 648-7719, dkramer@usgs.gov, fax: (703) 648-7975] #12;67 GALLIUM Consolidation of companies and Use: No domestic primary gallium recovery was reported in 2005. One company in Utah recovered

  1. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1997. Two companies in

    E-Print Network [OSTI]

    and Use: No domestic primary gallium recovery was reported in 1997. Two companies in Oklahoma and Utah in optoelectronic devices, which include light-emitting diodes (LED's), laser diodes, photodetectors, and solar-than-expected increase in demand. The company planned to operate its refineries in France and Germany using stockpiled

  2. (Data in kilograms of gallium content, unless noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1995. Two companies in

    E-Print Network [OSTI]

    : No domestic primary gallium recovery was reported in 1995. Two companies in Oklahoma and Utah recovered devices, which include light-emitting diodes (LED's), laser diodes, photodetectors, and solar cells contract to a consortium of private companies to develop gallium nitride technology. Blue LED's are useful

  3. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1999. Two companies in

    E-Print Network [OSTI]

    and Use: No domestic primary gallium recovery was reported in 1999. Two companies in Oklahoma and Utah in optoelectronic devices, which include light-emitting diodes (LED's), laser diodes, photodetectors, and solar in July. The additional facility was expected to double the company's refinery capacity to 100

  4. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 2002. Two companies in

    E-Print Network [OSTI]

    and Use: No domestic primary gallium recovery was reported in 2002. Two companies in Oklahoma and Utah diodes, photodetectors, and solar cells. Integrated circuits represented 65% of gallium demand forecasts of market growth, several companies were consolidating, reducing, or eliminating their Ga

  5. NERSC System Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |IsLove Your1AllocationsNOVAPlayed Key Role inReports Usage Reports

  6. Westinghouse Hanford Company effluent discharges and solid waste management report for calendar year 1989: 200/600 Areas

    SciTech Connect (OSTI)

    Brown, M.J.; P'Pool, R.K.; Thomas, S.P.

    1990-05-01T23:59:59.000Z

    This report presents calendar year 1989 radiological and nonradiological effluent discharge data from facilities in the 200 Areas and the 600 Area of the Hanford Site. Both summary and detailed effluent data are presented. In addition, radioactive and nonradioactive solid waste storage and disposal data for calendar year 1989 are furnished. Where appropriate, comparisons to previous years are made. The intent of the report is to demonstrate compliance of Westinghouse Hanford Company-operated facilities with administrative control values for radioactive constituents and applicable guidelines and standards (including Federal permit limits) for nonradioactive constituents. 11 refs., 20 tabs.

  7. SPECTR System Operational Test Report

    SciTech Connect (OSTI)

    W.H. Landman Jr.

    2011-08-01T23:59:59.000Z

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  8. adr reporting systems: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Renewable Energy Websites Summary: to endorse or advertise a commercial product or company. 12;Gentle Logging System Evaluation (ParticipantsGentle Logging System...

  9. accident reporting system: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Renewable Energy Websites Summary: to endorse or advertise a commercial product or company. 12;Gentle Logging System Evaluation (ParticipantsGentle Logging System...

  10. Walk-through survey report: Control technology for metal reclamation industries at East Penn Manufacturing Company Inc. , Lyon Station, Pennsylvania

    SciTech Connect (OSTI)

    Hall, R.M.

    1994-08-12T23:59:59.000Z

    A walk through survey was conducted at the East Penn Manufacturing Company (SIC-3341), Lyon Station, Pennsylvania to identify and evaluate potentially effective controls and work practices in the lead (7439921) reclamation industry. The facility was a secondary lead smelter which operated 7 days a week, and recycled about 20,000 batteries a day, primarily automobile batteries. The company employed automation, local exhaust ventilation, partial enclosures, and enclosed ventilation systems in the reverberatory furnace operations, blast furnace operations, and casting and refinery area to reduce employee exposure to lead. The arsenic (7440382) personal exposure time weighted averages ranged from 0.10 to 1.14 microg/cubic m in the industrial battery breaking area and ranged from nondetected to 6.16 microg/cubic m in the alloying/pots area.

  11. Cooperative Research and Development Agreement between the California Air Resources Board and Lockheed Martin Idaho Technologies Company. Final report

    SciTech Connect (OSTI)

    Cole, G.H.

    1998-04-01T23:59:59.000Z

    This report summarizes the activities under a Cooperative Research and Development Agreement (CRADA) between Lockheed-Martin Idaho Technologies Company (LMITCO) and the California Air Resources Board (CARB). The activities were performed at the Idaho National Engineering and Environmental Laboratory (INEEL) between June 1995 and December 1997. Work under this agreement was concentrated in two task areas as defined in the California Air Resources Board`s contract number 94-908 having an approval date of June 9, 1995: Task 1--EV and HEV Vehicle Testing and Assessment and Task 4--Advanced Battery Testing.

  12. Pollution Prevention Tracking and Reporting System | Department...

    Energy Savers [EERE]

    Pollution Prevention Tracking and Reporting System Pollution Prevention Tracking and Reporting System Welcome to the Department of Energy's Pollution Prevention Tracking and...

  13. MACHINE AND FOUNDRY COMPANY

    Office of Legacy Management (LM)

    MACHINE AND FOUNDRY COMPANY kt '- : :' ENGINEERING DIVISIOJ ---. Cl FIELD iRIP ,REP@?T ,' i;:z;zy MEETING REPORT : .I.-.-' Y ::,:I :. &, .I7 ENGINEERING REPORT- : T, ...

  14. Modular Interpreted Systems: A Preliminary Report

    E-Print Network [OSTI]

    Zachmann, Gabriel

    Zachmann (Computer Graphics) #12;Modular Interpreted Systems: A Preliminary Report Wojciech Jamroga1

  15. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    SciTech Connect (OSTI)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01T23:59:59.000Z

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  16. Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995

    SciTech Connect (OSTI)

    Schmidt, J.W., Westinghouse Hanford

    1996-07-30T23:59:59.000Z

    This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  17. 2007 NET SYSTEM POWER REPORT STAFFREPORT

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION 2007 NET SYSTEM POWER REPORT STAFFREPORT April 2008 CEC-200 .................................................................................................................. 1 Net System Power Findings.............................................................................................. 4 Net System Power and Sources of California Electric Generation

  18. Health hazard evaluation report HETA 88-391-2156, Morton Salt Company, Weeks Island, Louisiana. (Revised April 1993)

    SciTech Connect (OSTI)

    Ferguson, R.P.; Knutti, E.B.

    1993-04-01T23:59:59.000Z

    In response to a request from the International Chemical Workers Union, an investigation was made of exposures to asbestos and diesel emissions at the Morton Salt Company, Weeks Island, Louisiana. The most significant source of particulates was diesel exhaust. None of the 20 personal breathing zone or area air samples collected in the mill exceeded limits for asbestos. An increased prevalence of chronic cough and phlegm was reported by workers. More complaints of eye irritation and tearing of the eyes were noted in underground workers, consistent with diesel byproduct exposure. Pulmonary function studies indicated that four workers had mild obstructive lung disease and one had moderate obstructive lung disease. Three workers with mild restriction of lung volume were also noted. None of the 61 chest films taken was positive for pneumoconiosis. The authors conclude that a potential hazard existed from exposure to diesel exhaust.

  19. Southern company energy storage study : a study for the DOE energy storage systems program.

    SciTech Connect (OSTI)

    Ellison, James; Bhatnagar, Dhruv; Black, Clifton [Southern Company Services, Inc., Birmingham, AL; Jenkins, Kip [Southern Company Services, Inc., Birmingham, AL

    2013-03-01T23:59:59.000Z

    This study evaluates the business case for additional bulk electric energy storage in the Southern Company service territory for the year 2020. The model was used to examine how system operations are likely to change as additional storage is added. The storage resources were allowed to provide energy time shift, regulation reserve, and spinning reserve services. Several storage facilities, including pumped hydroelectric systems, flywheels, and bulk-scale batteries, were considered. These scenarios were tested against a range of sensitivities: three different natural gas price assumptions, a 15% decrease in coal-fired generation capacity, and a high renewable penetration (10% of total generation from wind energy). Only in the elevated natural gas price sensitivities did some of the additional bulk-scale storage projects appear justifiable on the basis of projected production cost savings. Enabling existing peak shaving hydroelectric plants to provide regulation and spinning reserve, however, is likely to provide savings that justify the project cost even at anticipated natural gas price levels. Transmission and distribution applications of storage were not examined in this study. Allowing new storage facilities to serve both bulk grid and transmission/distribution-level needs may provide for increased benefit streams, and thus make a stronger business case for additional storage.

  20. Health-hazard evaluation report HETA 84-449-1778, Agrico Chemical Company, Pierce, Florida

    SciTech Connect (OSTI)

    Singal, M.

    1987-02-01T23:59:59.000Z

    In response to a request from the International Chemical Workers Union an evaluation was made of respiratory problems among workers at the Agrico Chemical Company, Pierce, Florida, which closed in 1979. Specific concern had been expressed regarding exposures to silica, coke, and asbestos. Of 108 persons participating in the study, 91 had worked at the elemental phosphorus facility (EP). Of 88 participants who had ten or more years in the phosphate industry, the 36 workers with ten or more years in the EP facility were no more likely to have chronic cough, shortness of breath, abnormal lung sounds on physical examination, pulmonary function impairment, or x-ray signs of fibrogenic dust exposure than those with less than 10 years exposure. Those working longer than 10 years in the EP facility had numerically higher prevalence of chronic bronchitis and chronic wheeze, but the differences were not statistically significant. The author concludes that no association between health and time at the EP facility could be discerned from the available data, although it is possible that the study participants were not representative of all former facility workers.

  1. In-depth survey report: Control technology for metal reclamation industries at East Penn Manufacturing Company Inc., Lyon Station, Pennsylvania

    SciTech Connect (OSTI)

    Hall, R.M.; Earnest, G.S.; Jensen, P.A.; Zimmer, A.T.

    1996-06-03T23:59:59.000Z

    In an effort to identify effective hazard control methods and work practices, an in depth evaluation was conducted at the East Penn Manufacturing Company Inc. (SIC-3341), Lyon Station, Pennsylvania, which had previously been identified as having the lowest air lead (7439921) concentrations in lead smelter areas during a previous survey. This facility was primarily involved in lead reclamation from recycled automobile and industrial batteries. Control methods employed included automation, local exhaust ventilation, partial enclosures, and enclosed ventilation systems in the reverberatory and blast furnaces, and in casting and refinery areas. Employees in production areas also wore filtered half mask respirators, adhered to strict company policies on personal hygiene, and participated in incentive programs designed to reduce blood lead levels and encourage good personal hygiene and work practices. The authors noted that there was a potential for significant lead exposure in the blast furnace area, reverberatory furnace area, refinery area, and front end load operations. The authors recommend that efforts be made to improve controls in these areas.

  2. A comparative analysis of technological learning systems in emerging rotorcraft companies

    E-Print Network [OSTI]

    Gan, Thiam Soon

    2011-01-01T23:59:59.000Z

    The aim of this research is to understand how emerging rotorcraft companies in various countries accomplished technological learning over the last sixty years. Owing to its unique products and growing market demand, ...

  3. Assembly cell layout and Kanban system design for an oilfield services company

    E-Print Network [OSTI]

    Liu, Junying, M. Eng. Massachusetts Institute of Technology

    2010-01-01T23:59:59.000Z

    The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts ...

  4. A system dynamics view of project management firefighting at a startup company

    E-Print Network [OSTI]

    Chiang, Melvin H. (Melvin Hsiang)

    2008-01-01T23:59:59.000Z

    Fire fighting in project management is the unplanned allocation of resources to either fix problems or speed completion of a project. In a startup company environment, fire fighting oftentimes becomes the norm rather than ...

  5. Performance Assessment Report Domain CHP System

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    Performance Assessment Report for the Domain CHP System November 2005 By Burns & McDonnell Engineering #12;Domain CHP System Performance Assessment Report for the Packaged Cooling, Heating and Power

  6. 2006 NET SYSTEM POWER REPORT COMMISSIONREPORT

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION 2006 NET SYSTEM POWER REPORT COMMISSIONREPORT April 2007 CEC-300 This report provides the California Energy Commission's annual calculation of net system power as required by state law (Public Utilities Code, § 398.1 - 398.5). The report also defines net system power

  7. (Data in kilograms of gallium content unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 2009. One company in Utah

    E-Print Network [OSTI]

    58 GALLIUM (Data in kilograms of gallium content unless otherwise noted) Domestic Production 98% of domestic gallium consumption. About 67% of the gallium consumed was used in integrated and Use: No domestic primary gallium recovery was reported in 2009. One company in Utah recovered

  8. (Data in kilograms of gallium content, unless otherwise noted) Domestic Production and Use: No domestic primary gallium recovery was reported in 1998. Two companies in

    E-Print Network [OSTI]

    66 GALLIUM (Data in kilograms of gallium content, unless otherwise noted) Domestic Production A. Kramer [(703) 648-7719, dkramer@usgs.gov, fax: (703) 648-7722] #12;67 GALLIUM Events, Trends and Use: No domestic primary gallium recovery was reported in 1998. Two companies in Oklahoma and Utah

  9. (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2009, clay and shale production was reported in 41 States. About 190 companies

    E-Print Network [OSTI]

    44 CLAYS (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2009, clay and shale production was reported in 41 States. About 190 companies operated approximately 830% drilling mud, 17% foundry sand bond, 14% iron ore pelletizing, and 20% other uses; common clay--57% brick

  10. (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2008, clay and shale production was reported in 41 States. About 190 companies

    E-Print Network [OSTI]

    46 CLAYS (Data in thousand metric tons unless otherwise noted) Domestic Production and Use: In 2008, clay and shale production was reported in 41 States. About 190 companies operated approximately 830% drilling mud, 17% foundry sand bond, 14% iron ore pelletizing, and 20% other uses; common clay--57% brick

  11. Site environmental report for the RMI Titanium Company Extrusion Plant, Ashtabula, Ohio. Annual report, 1 January--31 December 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31T23:59:59.000Z

    This report presents information describing the environmental protection program of the RMI Decommissioning Project (RMIDP), and the data obtained from the implementation of the program in 1993. The program involves ongoing environmental surveillance and monitoring campaigns. The program is conducted based upon guidance from the EPA, NRC, and the DOE. The data obtained from the program are compared with environmental standards and requirements, and highlight significant efforts that have been made to achieve compliance with these standards. This report follows the guidance described in DOE order 5400.1, and presents data on radionuclide and chemical constituents in environmental media at and near the site which include air, surface water, groundwater, soil, and stream sediments. It also describes the potential effects of facility operations on the public. Additionally, this report contains an Environmental Compliance Summary outlining specific environmental compliance activities conducted by RMI.

  12. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment ofLetter Report: I11IG002RTC3 | ofproposalof

  13. Westinghouse Hanford Company health and safety performance report. Fourth quarter calendar year 1994

    SciTech Connect (OSTI)

    Lansing, K.A.

    1995-03-01T23:59:59.000Z

    Detailed information pertaining to As Low As Reasonably Achievable/Contamination Control Improvement Project (ALARA/CCIP) activities are outlined. Improved commitment to the WHC ALARA/CCIP Program was experienced throughout FY 1994. During CY 1994, 17 of 19 sitewide ALARA performance goals were completed on or ahead of schedule. Estimated total exposure by facility for CY 1994 is listed in tables by organization code for each dosimeter frequency. Facilities/areas continue to utilize the capabilities of the RPR tracking system in conjunction with the present site management action-tracking system to manage deficiencies, trend performance, and develop improved preventive efforts. Detailed information pertaining to occupational injuries/illnesses are provided. The Industrial Safety and Hygiene programs are described which have generated several key initiatives that are believed responsible for improved safety performance. A breakdown of CY 1994 occupational injuries/illnesses by type, affected body group, cause, job type, age/gender, and facility is provided. The contributing experience of each WHC division/department in attaining this significant improvement is described along with tables charting specific trends. The Radiological Control Program is on schedule to meet all RL Site Management System milestones and program commitments.

  14. Final Report of a CRADA Between Pacific Northwest National Laboratory and the General Motors Company (CRADA No. PNNL/271): “Degradation Mechanisms of Urea Selective Catalytic Reduction Technology”

    SciTech Connect (OSTI)

    Kim, Do Heui; Lee, Jong H.; Peden, Charles HF; Howden, Ken; Kim, Chang H.; Oh, Se H.; Schmieg, Steven J.; Wiebenga, Michelle H.

    2011-12-13T23:59:59.000Z

    Diesel engines can offer substantially higher fuel efficiency, good driving performance characteristics, and reduced carbon dioxide (CO2) emission compared to stoichiometric gasoline engines. Despite the increasing public demand for higher fuel economy and reduced dependency on imported oil, however, meeting the stringent emission standards with affordable methods has been a major challenge for the wide application of these fuel-efficient engines in the US market. The selective catalytic reduction of NOx by urea (urea-SCR) is one of the most promising technologies for NOx emission control for diesel engine exhausts. To ensure successful NOx emission control in the urea-SCR technology, both a diesel oxidation catalyst (DOC) and a urea-SCR catalyst with high activity and durability are critical for the emission control system. Because the use of this technology for light-duty diesel vehicle applications is new, the relative lack of experience makes it especially challenging to satisfy the durability requirements. Of particular concern is being able to realistically simulate actual field aging of the catalyst systems under laboratory conditions, which is necessary both as a rapid assessment tool for verifying improved performance and certifiability of new catalyst formulations. In addition, it is imperative to develop a good understanding of deactivation mechanisms to help develop improved catalyst materials. In this CRADA program, General Motors Company and PNNL have investigated fresh, laboratory- and vehicle-aged DOC and SCR catalysts. The studies have led to a better understanding of various aging factors that impact the long-term performance of catalysts used in the urea-SCR technology, and have improved the correlation between laboratory and vehicle aging for reduced development time and cost. This Final Report briefly highlights many of the technical accomplishments and documents the productivity of the program in terms of peer-reviewed scientific publications (2 total), reports (3 total including this Final Report), and presentations (5 total).

  15. Westinghouse Hanford Company health and safety performance report. Third quarter calendar year 1995

    SciTech Connect (OSTI)

    Lansing, K.A.

    1995-11-01T23:59:59.000Z

    The lost/restricted workday severity rate posted in CY 1994 of 45.50 was a significant improvement over the prior years and, remarkably, this rate has been reduced to 16.40 thus far in CY 1995 (Table 2--2). The indications from this sustained reduction are that employee, management, HEHF, and accident investigator efforts to manage injuries are becoming stronger (page 2--8). Congratulations to the Human Resources Department for working over 835,000 hours without a lost workday away injury/illness! The last lost workday away case occurred on 12/17/92. The Workers Compensation Report shows significant reduction in the amount of money expended for medical treatments and time loss due to industrial injuries. The cost of insurance continues to decrease. Continued savings can be attributed to aggressive claims and safety case management, an enhanced attitude by management creating a positive and proactive safety awareness culture, and a more aggressive return-to-work philosophy.

  16. Health hazard evaluation report HETA 96-0137-2607, Yankee Atomic Electric Company, Rowe, Massachusetts

    SciTech Connect (OSTI)

    Sylvain, D.C.

    1996-10-01T23:59:59.000Z

    In response to a request from the Health and Safety Supervisor at the Yankee Nuclear Power Station (SIC-4911), Rowe, Massachusetts, an investigation was begun into ozone (10028156) exposure during plasma arc cutting and welding. Welders had reported chest tightness, dry cough, and throat and bronchial irritation. The nuclear power station was in the process of being decommissioned, and workers were dismantling components using welding and cutting methods. Of the operations observed during the site visit, the highest ozone concentrations were generated during plasma arc cutting, followed by metal inert gas (MIG) welding and arc welding. During plasma arc cutting the average and peak concentrations exceeded the NIOSH ceiling recommended exposure limit of 0.1 part per million. The author concludes that ozone exposure during plasma arc cutting and MIG welding presented a health hazard to welders. The author recommends that improvements be made in the local exhaust ventilation, that nitrogen-dioxide levels be monitored during hot work, and that many exposed workers wear protective clothing, use ultraviolet blocking lotion, and continue the use appropriate shade of eye protection.

  17. Westinghouse Hanford Company health and safety performance report, First quarter calendar year 1994

    SciTech Connect (OSTI)

    Lansing, K.A.

    1994-05-01T23:59:59.000Z

    Safety training programs for the employee, manager, and safety observer are undergoing refinements in response to employee suggestions as well as to promote the interactions necessary to the success of the Voluntary Protection Program. Adjustments to these programs are described on pages 2-1 and 2-2. Significant events, which carry lessons we must learn in order to reduce injury potential, are summarized on pages 2-2 and 2-3. The events highlighted this quarter involve indoor air quality and unexpected weather changes which can impact outdoor work activities. Our analysis of injuries occurring this reporting period continues to feature the simple-task injuries which reflect on awareness levels and culture strength. In addition to injuries arising from simple, everyday tasks, a significant number of injuries were caused by objects in ``blind spots``. These are items placed out of view where an employee can contact them by reaching in to a drawer (staples, exacto blades, etc.), or by bumping/brushing against (wall hangings, sharp furniture edges).

  18. Site environmental report for calendar year 2002. DOE operations at the Boeing Company, Rocketdyne Propulsion and Power

    SciTech Connect (OSTI)

    none,

    2003-09-30T23:59:59.000Z

    This Annual Site Environmental Report (ASER) for 2002 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing' s Santa Susana Field Laboratory (SSFL)). In the past, the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations at ETEC included development , fabrication , and disassembly of nuclear reactors , reactor fuel, and other radioactive materials . Other activities at ETEC involved the operation of large-scale liquid metal facilities that were used for testing liquid metal fast breeder components. All nuclear work was terminated in 1988, and, subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites . Closure of the liquid metal test facilities began in 1996. Results of the radiological monitoring program for the calendar year 2002 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL . All potential exposure pathways are sampled and/or monitored , including air , soil, surface water, groundwater , direct radiation , transfer of property ( land, structures, waste), and recycling. All radioactive w astes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste disposal . No liquid radioactive wastes are released into the environment, and no structural debris from buildings w as transferred to municipal landfills or recycled in 2002.

  19. Site Environmental Report for Calendar Year 2007. DOE Operations at The Boeing Company, Santa Susana Field Laboratory, Area IV

    SciTech Connect (OSTI)

    none,

    2008-09-30T23:59:59.000Z

    This Annual Site Environmental Report (ASER) for 2007 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of Boeing’s Santa Susana Field Laboratory (SSFL). The Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility, was located in Area IV. The operations in Area IV included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials. Other activities in the area involved the operation of large-scale liquid metal facilities that were used for testing non-nuclear liquid metal fast breeder components. All nuclear work was terminated in 1988; all subsequent radiological work has been directed toward decontamination and decommissioning (D&D) of the former nuclear facilities and their associated sites. In May 2007, the D&D operations in Area IV were suspended until DOE completes the SSFL Area IV Environmental Impact Statement (EIS). The environmental monitoring programs were continued throughout the year. Results of the radiological monitoring program for the calendar year 2007 continue to indicate that there are no significant releases of radioactive material from Area IV of SSFL. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, direct radiation, transfer of property (land, structures, waste), and recycling. All radioactive wastes are processed for disposal at DOE disposal sites and/or other licensed sites approved by DOE for radioactive waste disposal. No liquid radioactive wastes were released into the environment in 2007.

  20. Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company. Final report

    SciTech Connect (OSTI)

    Paller, M. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1992-03-26T23:59:59.000Z

    Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor`s heat exchangers where temperatures may reach 70{degrees}C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams & Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

  1. Tampa Electric Company, Polk Power Station Unit No. 1. Annual report, January--December 1992

    SciTech Connect (OSTI)

    none,

    1993-10-01T23:59:59.000Z

    As part of the Tampa Electric Polk Power Unit No. 1, a Texaco pressurized, oxygen-blown entrained-flow coal gasifier will convert approximately 2300 tons per day of coal (dry basis) into a medium-BTU fuel gas with a heat content of about 250 BTU/scf (LHV). Syngas produced in the gasifier flows through a high-temperature heat recovery unit which cools the gases prior to entering two parallel clean-up areas. A portion (up to 50%) of the hot syngas is cooled to 1000{degrees}F and passed through a moving bed of zinc titanate sorbent which removed sulfur containing components of the fuel gas. The project will be the first in the world to demonstrate this advanced metal oxide hot gas desulfurization technology at a commercial scale. The remaining portion of the syngas is cooled to 400{degrees}F for conventional acid gas removal. This portion of the plant is capable of processing between 50% and 100% of the dirty syngas. The cleaned low-BTU syngas is then routed to the combined cycle power generation system where it is mixed with air and burned in the gas turbine combustor. Heat is extracted from the expanded exhaust gases by a heat recovery steam generator to produce high pressure steam. This steam, along with the steam generated in the gasification process, drives a steam turbine to generate an additional 132MW of power. Internal process power consumption is approximately 62MW, and includes power for coal grinding, air separation, and feed pumps. Net output from the IGCC demonstration plant will be 260MW.

  2. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 2. Accounting

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Law, E.; Rudshagen, C.; Yevchak, S.

    1993-04-01T23:59:59.000Z

    As part of a study of unaccounted-for gas (UAF), performed by the Southern California Gas Company (SoCalGas), volume II of the six-volume set presents the results of the accounting portion, including sections on accounting adjustments and company-use gas. It identifies enhancements to accounting practices that make records more accurately reflect the physical activity occurring in the system. The result is an accounting record of gas volumes received and delivered which have been adjusted for the enhancements, and exclude accounting estimates and prior period adjustments.

  3. Technical Report Value of Systems Engineering

    E-Print Network [OSTI]

    Honour, Eric C.

    This report is a follow-on from the June 2004 Air Force/Lean Aerospace Initiative Workshop on Systems Engineering for Robustness.

  4. Capital Reporting Company Quadrennial ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Congressional District. Representative Waxman has 6 been a leader in the Congress on health care and 7 environmental issues. He is a primary author of 8 the Clean Air Act...

  5. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    QUADRENNIAL ENERGY REVIEW Infrastructure Constraints Friday, August 8, 2014 Bismarck, North Dakota Bismarck State College National Energy Center of Excellence Bavendick Stateroom...

  6. Capital Reporting Company Quadrennial ...

    Office of Environmental Management (EM)

    UNITED STATES DEPARTMENT OF ENERGY ***** QUADRENNIAL ENERGY REVIEW ***** PUBLIC STAKEHOLDER MEETING Friday, August 8, 2014 University of Illinois-Chicago Student Center...

  7. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    U.S. Department of Commerce Matthew Shruhan, U.S.-India Business Council 21 Brooke Smith, Nuclear Regulatory Commission Gretchen Smith, DOENNSA 22 Carlton Stoiber, Talisman...

  8. Final report - Sundyne Company

    SciTech Connect (OSTI)

    Long, J.B.

    1994-09-27T23:59:59.000Z

    Solar cookers offer a viable alternative to conventional cooking methods in many areas, and can be an effective tool in the fight against the deforestation and desertification that plague many developing countries. However, there have been numerous obstacles to the successful dissemination of solar cookers in the past. The purpose of this paper is to identify opportunities, review constraints and develop a marketing strategy to disseminate the Sundyne Solar Cooker (SSC) in developing countries.

  9. Capital Reporting Company

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom: UtilizingDepartment62-LNG -First Reportof5

  10. Capital Reporting Company

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom: UtilizingDepartment62-LNG -First Reportof511

  11. Capital Reporting Company

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJuneWaste To Wisdom: UtilizingDepartment62-LNG -First

  12. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer | National011-03-2010EIS News | 9B.1. ForCTBT

  13. Capital Reporting Company

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer | National011-03-2010EIS News | 9B.1. ForCTBT

  14. Hydrogen Storage Systems Analysis Meeting: Summary Report, March...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting: Summary Report, March 29, 2005 Hydrogen Storage Systems Analysis Meeting: Summary Report, March 29, 2005 This report highlights DOE's systems analysis work related to...

  15. Natural gas annual 1992: Supplement: Company profiles

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The data for the Natural Gas Annual 1991 Supplement : Company Profiles are taken from Form EIA-176, (open quotes) Annual Report of Natural and Supplemental Gas Supply and Disposition (close quotes). Other sources include industry literature and corporate annual reports to shareholders. The companies appearing in this report are major interstate natural gas pipeline companies, large distribution companies, or combination companies with both pipeline and distribution operations. The report contains profiles of 45 corporate families. The profiles describe briefly each company, where it operates, and any important issues that the company faces. The purpose of this report is to show the movement of natural gas through the various States served by the 45 large companies profiled.

  16. Energy Systems Group Annual Report

    E-Print Network [OSTI]

    Anand, N. K.; Caton, J.; Heffington, W. M.; O'Neal, D. L.; Somasundaram, S.; Turner, W. D.

    1986-01-01T23:59:59.000Z

    in this project. Annual expenditures for energy use in Texas State Agencies in 1984 was over two hundred million dollars. This study has four major tasks. First, the Energy Systems Laboratory is the data collection center for monthly energy data from each... by the Energy Systems Group is improving the efficiency of energy use. Currently, the research focuses on improving energy efficiency in heating and air conditioning equipment, improving thermal efficiency of buildings, implementation of Cogeneration systems...

  17. Intelligent wind power prediction systems final report

    E-Print Network [OSTI]

    Intelligent wind power prediction systems ­ final report ­ Henrik Aalborg Nielsen (han (FU 4101) Ens. journal number: 79029-0001 Project title: Intelligent wind power prediction systems #12;#12;Intelligent wind power prediction systems 1/36 Contents 1 Introduction 6 2 The Wind Power Prediction Tool 7 3

  18. Industrial-hygiene walk-through survey report of Firestone Synthetic Rubber and Latex Company, Lake Charles, Louisiana

    SciTech Connect (OSTI)

    Fajen, J.M.; Ungers, L.J.

    1986-03-01T23:59:59.000Z

    A walk-through survey was conducted at the Firestone Synthetic Rubber and Latex Company, Lake Charles, Louisiana in July, 1985. The purpose of the survey was to obtain information on the 1,3-butadiene polymer manufacturing process and evaluate exposure potential. Bulk samples of vinylpyridine latex, styrene/butadiene rubber, and polybutadiene rubber were analyzed for residual 1,3-butadiene.

  19. Army Energy and Water Reporting System Assessment

    SciTech Connect (OSTI)

    Deprez, Peggy C.; Giardinelli, Michael J.; Burke, John S.; Connell, Linda M.

    2011-09-01T23:59:59.000Z

    There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

  20. Clinical Research Informatics Systems Project Final Report

    E-Print Network [OSTI]

    Provancher, William

    Clinical Research Informatics Systems Project Final Report March 29, 2010 Rev. 8.30.2010 Report.N. Clinical Research Nurse Division of Endocrinology, Diabetes and Metabolism Donald McClain's Lab Rachel Tennyson Sponsored Projects Officer, Clinical Trials Office of Sponsored Projects Kristie Thompson Grants

  1. Impacts of the extended-weight coal haul road system (interim report). Research report

    SciTech Connect (OSTI)

    Crabtree, J.D.; Pigman, J.G.; Deacon, J.A.; Agent, K.R.

    1993-10-01T23:59:59.000Z

    The Extended-Weight Coal Haul Road System, created by Kentucky`s Legislature in 1986, consists of all roads which carry over 50,000 tons of coal in a calendar year. Trucks hauling coal on this system are authorized to exceed normal weight limits through the payment of an annual decal fee. A research study was initiated in July of 1992 to analyze the impacts of the extended-weight system. This interim report prepared after one year of a three-year study, describes the analyses performed thus far and presents preliminary findings, recommendations, and a discussion of future work. Analyses in this report are based on: historical data on coal production and transportation; data from coal decal applications; interviews of legislators, transportation officials, coal company representatives, and coal trucking representatives: newspaper articles; vehicle classification data; a pavement cost analysis; and accident data. Preliminary conclusions include: (1) The extended-weight system has apparently been somewhat successful in accomplishing the primary objectives: to enhance the competitiveness and economic viability of Kentucky`s coal industry and to eliminate the perceived need for cal haulers to violate the law in order to be competitive; (2) Overall accident rates are no higher on the extended-weight system than on other comparable routes, but the fatal accident rate is significantly higher on the extended-weight system; (3) The coal-decal fee structure results in a net annual loss in Road Fund revenue of approximately $2 million; (4) Forty percent of the revenue from decal sales is allocated to the counties, although less than ten percent of the extended-weight system in county-maintained; (5) The heavier weights of coal-decal trucks add approximately $9 million annually to pavement overlay costs and increase other highway costs. (6) Road users throughout the state are subsidizing the movement of Kentucky coal by underwriting the increased costs.

  2. Research results from the Ashland Exploration, Inc., Ford Motor Company 80 (COOP 2) well, Pike County, KY. Topical report, October 1991-November 1992

    SciTech Connect (OSTI)

    Frantz, J.H.; Lancaster, D.E.

    1993-04-01T23:59:59.000Z

    The report summarizes the work performed on the Ashland Exploration, Inc. (AEI) Ford Motor Company 80 (COOP 2) well in Pike County, KY. The COOP 2 was the second well in a three-well research project being conducted by GRI in eastern Kentucky targeting both the Devonian Shales and the Berea Sand; the FMC 80 focused on the Berea. The primary objective of the research was to use and transfer technologies developed in GRI`s Tight Gas Sands and Gas Shales programs to evaluate the Berea in Pike Co., KY.

  3. 1998 FFTF annual system assessment reports

    SciTech Connect (OSTI)

    Guttenberg, S.

    1998-03-19T23:59:59.000Z

    The health of FFTF systems was assessed assuming a continued facility standby condition. The review was accomplished in accordance with the guidelines of FFTF-EI-083, Plant Evaluation Program. The attached document includes an executive summary of the significant conclusions and assessment reports for each system evaluated.

  4. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 1. Project summary

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Law, E.; Ozenne, D.

    1993-01-01T23:59:59.000Z

    A study of unaccounted-for gas (UAF), performed by the Southern California Gas Company (SoCalGas) to determine the UAF gas volume in the SoCalGas system, to identify the factors contributing to UAF, and to estimate the gas volume associated with each factor, is described. It was found that measurement-related effects contributed more than 80% of SoCalGas' 1991 UAF volume. Less than 3% is associated with adjustments to SoCalGas' accounting system, and approximately 6% is associated with losses due to theft. Testing showed that the leakage element contributed only 8% of the UAF volume.

  5. El Paso Electric Company- Small and Medium System Renewable Energy Certificate Purchase Program

    Broader source: Energy.gov [DOE]

    Effective January 1, 2010, El Paso Electric is purchasing renewable energy certificates (RECs) from its New Mexico customers who install small photovoltaic (PV) systems and wind systems up to 10...

  6. 2013 Annual Merit Review Results Report - Hybrid Vehicle Systems...

    Broader source: Energy.gov (indexed) [DOE]

    2013 Annual Merit Review Results Report 2012 Annual Merit Review Results Report - Hybrid Vehicle Systems Technologies 2012 Annual Merit Review Results Report - Introduction...

  7. Class 3 Tracking and Monitoring System Report

    SciTech Connect (OSTI)

    Safely, Eugene; Salamy, S. Phillip

    1999-11-29T23:59:59.000Z

    The objective of Class 3 tracking system are to assist DOE in tracking and performance and progress of these projects and to capture the technical and financial information collected during the projects' monitoring phase. The captured information was used by DOE project managers and BDM-Oklahoma staff for project monitoring and evaluation, and technology transfer activities. The proposed tracking system used the Class Evaluation Executive Report (CLEVER), a relation database for storing and disseminating class project data; GeoGraphix, a geological and technical analysis and mapping software system; the Tertiary Oil Recovery Information System (TORIS) database; and MS-Project, a project management software system.

  8. New Business Opportunity Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    report and analysis Company Description: A billion dollar, middle market private equity firm. We just trading and transaction comps from relevant databases. Assist in valuing new deals and marking to market organization of radiant heating

  9. Brawley 10 MW Geothermal Plant Plant Manual for Southern Californa Edison Company and Union Oil Company of California. Volume I. Systems Descriptions

    SciTech Connect (OSTI)

    None

    1980-11-28T23:59:59.000Z

    This volume covers Systems Descriptions. It presents each system of the facility and discusses basic features. Brief discussion of each piece of major equipment in system and design conditions.

  10. The 2011 Cessna Aircraft Company/Raytheon Missile Systems Design/Build/Fly Competition Flyoff was held at TIMPA Field in Tucson, AZ on the weekend of April 15-17, 2011. This was the 15th

    E-Print Network [OSTI]

    Southern California, University of

    The 2011 Cessna Aircraft Company/Raytheon Missile Systems Design/Build/Fly Competition Flyoff Cessna Aircraft, Raytheon Missile Systems, and the AIAA sponsoring technical committees: Applied also go to the corporate Sponsors: Raytheon Missile Systems and Cessna Aircraft Company, and also

  11. The Wildlife Accident Reporting System (WARS) in British Columbia

    E-Print Network [OSTI]

    Sielecki, Leonard E.

    2003-01-01T23:59:59.000Z

    2001, WARS 2000 Wildlife Accident Reporting System (2000related motor vehicle accident claim data and funding toTHE WILDLIFE ACCIDENT REPORTING SYSTEM (WARS) IN BRITISH

  12. Investment companies

    E-Print Network [OSTI]

    Sauer, Edward F

    1961-01-01T23:59:59.000Z

    stockholder challenged the management fee paid to F. Eberstadt & Co. , Inc. , manager and distributor of Chemical Fund. The court dismissed the case on the grounds that excessive fees had not been proved. This case, however, could hardly be considered a... Tax-Exempt Bond Funds. . . . . . . . Daily Pricing of Mutual Investment Company Shares. 56 57 59 59 60 iv Management Fees. . . . . Tax-Free Exchange Funds . 61 62 V. CONCLUSIONS 63 BIBLIOGRAPHY GLOSSARY OF TERMS Balanced fund...

  13. MANAGEMENT INFORMATION SYSTEMS (MIS) In a technology bound society, companies rely on

    E-Print Network [OSTI]

    to the $44,000 Clay Barton Scholarship. Admission When you choose to major in Management Information Systems business, management, marketing, operations management, and personal selling. The W. Frank Barton School

  14. Advances in Complex Systems, Vol. 4, No. 4 (2001) 407417 c World Scientific Publishing Company

    E-Print Network [OSTI]

    Ottino, Julio M.

    2001-01-01T23:59:59.000Z

    flows of granular materials, that is flows confined to a surface layer on a static granular bed and storage of materials in systems such as rotary kilns, tumbling mixers, and feeding and discharge of silos

  15. Industry-wide studies report of an in-depth survey at Firestone Synthetic Rubber and Latex Company, Lake Charles, Louisiana

    SciTech Connect (OSTI)

    Krishnan, E.R.; Ungers, L.J.; Fajen, J.M.

    1987-02-02T23:59:59.000Z

    In order to assess worker exposure to 1,3-butadiene at a polymer production facility, an in-depth industrial-hygiene survey was conducted at Firestone Synthetic Rubber and Latex Company, Lake Charles, Louisiana. This facility incorporated a number of controls designed to prevent the release of chemical intermediates and products into the air. Personal protective equipment included rubber, cotton, or vinyl gloves depending on the job performed. Respirators were required for field lab samplers and maintenance personnel performing specific tasks. Half-face organic vapor respirators were used. The authors recommend that consideration be given to converting to a closed-loop sampling system for obtaining quality control samples.

  16. Analysis of Hybrid Hydrogen Systems: Final Report

    SciTech Connect (OSTI)

    Dean, J.; Braun, R.; Munoz, D.; Penev, M.; Kinchin, C.

    2010-01-01T23:59:59.000Z

    Report on biomass pathways for hydrogen production and how they can be hybridized to support renewable electricity generation. Two hybrid systems were studied in detail for process feasibility and economic performance. The best-performing system was estimated to produce hydrogen at costs ($1.67/kg) within Department of Energy targets ($2.10/kg) for central biomass-derived hydrogen production while also providing value-added energy services to the electric grid.

  17. Company number 5857955 Wellcome Trust Finance plc

    E-Print Network [OSTI]

    Rambaut, Andrew

    Company number 5857955 Wellcome Trust Finance plc Annual Report and Financial Statements Year ended 30 September 2012 #12;Company number 5857955 Wellcome Trust Finance plc Contents Page Directors Trust Finance plc Directors' Report for the year ended 30 September 2012 Report of the Directors

  18. Company number 5857955 Wellcome Trust Finance plc

    E-Print Network [OSTI]

    Rambaut, Andrew

    Company number 5857955 Wellcome Trust Finance plc Annual Report and Financial Statements Year ended 30 September 2013 #12;Company number 5857955 Wellcome Trust Finance plc Contents Page Directors Trust Finance plc Directors' Report For the year ended 30 September 2013 Report of the Directors

  19. Public health assessment for Reynolds Metals Company, Troutdale, Multnomah County, Oregon, Region 10. Cerclis No. ORD009412677. Final report

    SciTech Connect (OSTI)

    NONE

    1997-01-14T23:59:59.000Z

    The Reynolds Metals Company in Troutdale, Oregon, is a primary aluminum plant. When operating, the plant produced wastes that were contaminated with aluminum, mercury, fluoride, polynuclear aromatic hydrocarbons (PAHs), polychlorinated biphenyls (PCBs), and cyanide. Studies are currently underway to determine the extent of environmental contamination and subsequent clean-up efforts which will be required. People may be exposed to contaminated soils and sediments in the area bordering the Columbia and Sandy rivers. Contamination at the site may have contributed to contamination of fish in the Columbia River, although it is difficult to determine what effect the site may have. Workers at the Reynolds site may also be exposed to contaminated soils and sediments, particularly those workers who are involved in outdoor activities.

  20. 1998 interim 242-A Evaporator tank system integrity assessment report

    SciTech Connect (OSTI)

    Jensen, C.E.

    1998-07-02T23:59:59.000Z

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  1. Model for a web based communication system between clinical engineers and medical device companies

    E-Print Network [OSTI]

    Misri, Sandeep

    1999-01-01T23:59:59.000Z

    is designed for maximum interoperability ? that is, the ability of a single application to access different Data Base Management Systems (DBMS) with the same source code. Database applications call functions in the ODBC interface, which are implemented..., a user only has to add a new driver to access a new DBMS; it is not necessary to recompile or relink the application. The ODBC software sits on a client machine and is called from an application. The request from the client application is passed...

  2. Outages of electric power supply resulting from cable failures Boston Edison Company system

    SciTech Connect (OSTI)

    None

    1980-07-01T23:59:59.000Z

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  3. Preoperational test report, recirculation condenser cooling systems

    SciTech Connect (OSTI)

    Clifton, F.T.

    1997-11-04T23:59:59.000Z

    This represents a preoperational test report for Recirculation Condenser Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The four system provide condenser cooling water for vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102. Each system consists of a valved piping loop, a pair of redundant recirculation pumps, a closed-loop evaporative cooling tower, and supporting instrumentation; equipment is located outside the farm on concrete slabs. Piping is routed to the each ventilation condenser inside the farm via below-grade concrete trenches. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  4. 1995 PVUSA progress report. Final report

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    Photovoltaics for Utility Scale Applications (PVUSA) is a national public-private partnership that is assessing and demonstrating the viability of utility-scale (US) photovoltaic (PV) electric generation systems and recent developments in PV module technology. This report updates the project`s progress, reviews the status and performance of the various PV installations during 1995, summarizes key accomplishments and conclusions, and serves as the final report under Pacific Gas and Electric Company`s project management.

  5. Research results from the Ashland Exploration, Inc. Ford Motor Company 78 (ed) well, Pike County, Kentucky. Topical report, April 1992-December 1993

    SciTech Connect (OSTI)

    Hopkins, C.W.; Frantz, J.H.; Lancaster, D.E.

    1995-06-01T23:59:59.000Z

    This report summarizes the work performed on the Ashland Exploration, Inc. Ford Motor Company 78 (Experimental Development (ED)) Well, in Pike County, KY. The ED well was the third well drilled in a research project conducted by GRI in eastern Kentucky targeting both the Devonian Shales and Berea Sandstone. Both the Shales and Berea were completed and tested in the ED well. The primary objective of the ED well was to apply what was learned from studying the Shalers in COOP 1 (first well drilled) and the Berea in COOP 2 (second well drilled) to both the Shales and the Berea in the ED well. Additionally, the ED well was used to evaluate the impact of different stimulation treatments on Shales production. Research in the ED well brings to a close GRI`s extensive field-based research program in the Appalachian Basin over the last ten years.

  6. Final evaluation report for Westinghouse Hanford Company, WRAP-1,208 liter waste drum, docket 94-35-7A, type A packaging

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-06-12T23:59:59.000Z

    This report documents the U.S. Department of Transportation Specification 7A Type A (DOT-7A) compliance test results of the Westinghouse Hanford Company, Waste Receiving and Processing Facility, Module 1 (WRAP-1) Drum. The WRAP-1 Drum was tested for DOE-HQ in August 1994, by Los Alamos National Laboratory, under docket number 94-35-7A. Additionally, comparison and evaluation of the approved, as-tested packaging configuration was performed by WHC in September 1995. The WRAP-1 Drum was evaluated against the performance of the DOT-17C, 208 1 (55-gal) steel drums tested and evaluated under dockets 89-13-7A/90-18-7A and 94-37-7A.

  7. Vitrification Facility integrated system performance testing report

    SciTech Connect (OSTI)

    Elliott, D.

    1997-05-01T23:59:59.000Z

    This report provides a summary of component and system performance testing associated with the Vitrification Facility (VF) following construction turnover. The VF at the West Valley Demonstration Project (WVDP) was designed to convert stored radioactive waste into a stable glass form for eventual disposal in a federal repository. Following an initial Functional and Checkout Testing of Systems (FACTS) Program and subsequent conversion of test stand equipment into the final VF, a testing program was executed to demonstrate successful performance of the components, subsystems, and systems that make up the vitrification process. Systems were started up and brought on line as construction was completed, until integrated system operation could be demonstrated to produce borosilicate glass using nonradioactive waste simulant. Integrated system testing and operation culminated with a successful Operational Readiness Review (ORR) and Department of Energy (DOE) approval to initiate vitrification of high-level waste (HLW) on June 19, 1996. Performance and integrated operational test runs conducted during the test program provided a means for critical examination, observation, and evaluation of the vitrification system. Test data taken for each Test Instruction Procedure (TIP) was used to evaluate component performance against system design and acceptance criteria, while test observations were used to correct, modify, or improve system operation. This process was critical in establishing operating conditions for the entire vitrification process.

  8. Test report : Princeton power systems prototype energy storage system.

    SciTech Connect (OSTI)

    Rose, David Martin; Schenkman, Benjamin L.; Borneo, Daniel R.

    2013-08-01T23:59:59.000Z

    The Department of Energy Office of Electricity (DOE/OE), Sandia National Laboratory (SNL) and the Base Camp Integration Lab (BCIL) partnered together to incorporate an energy storage system into a microgrid configured Forward Operating Base to reduce the fossil fuel consumption and to ultimately save lives. Energy storage vendors will be sending their systems to SNL Energy Storage Test Pad (ESTP) for functional testing and then to the BCIL for performance evaluation. The technologies that will be tested are electro-chemical energy storage systems comprised of lead acid, lithium-ion or zinc-bromide. Princeton Power Systems has developed an energy storage system that utilizes lithium ion phosphate batteries to save fuel on a military microgrid. This report contains the testing results and some limited analysis of performance of the Princeton Power Systems Prototype Energy Storage System.

  9. Westinghouse Hanford Company ALARA year-end report, Calendar Year 1994: Revision 3A, Radiological engineering and ALARA

    SciTech Connect (OSTI)

    Berglund, O.D.

    1995-06-01T23:59:59.000Z

    It has long been the US Department of Energy`s (DOE`s) Policy that radiation doses should be maintained as far below the dose limits as is reasonably achievable. This policy, known as the ``ALARA Principle of radiation protection,`` maintains that radiation exposures should be maintained as low as reasonably achievable, taking into account social, technical, economic, practical, and public policy considerations. The ALARA Principle is based on the hypothesis that even very low radiation doses carry some risk. As a result, it is not enough to maintain doses at/or slightly below limits; the lower the doses, the lower the risks. Because it is not possible to reduce all doses at DOE facilities to zero, economic and social factors must be considered to determine the optimal level of radiation doses. According to the ALARA Principle, if doses are too high, resources should be well spent to reduce them. At some point, the resources being spent to maintain low doses are exactly balanced by the risks avoided. Reducing doses below this point results in a misallocation of resources; the resources could be spent elsewhere and have a greater positive impact on health and safety. The objective of the Westinghouse Hanford Company (WHC) ALARA/Contamination Control Improvement Project (CCIP) Program is to manage and control exposures (both individual and collective) to the work force, the general public, and the environment to levels as low as is reasonable using the aforementioned ALARA Principle.

  10. Enhancing the use of coals by gas reburning-sorbent injection: Volume 3 -- Gas reburning-sorbent injection at Edwards Unit 1, Central Illinois Light Company. Final report

    SciTech Connect (OSTI)

    NONE

    1996-03-01T23:59:59.000Z

    Design work has been completed for a Gas Reburning-Sorbent Injection (GR-SI) system to reduce emissions of NO{sub x} and SO{sub 2} from a wall fired unit at Central Illinois Light Company`s Edwards Station Unit 1, located in Bartonville, Illinois. The goal of the project was to reduce emissions of NO{sub x} by 60%, from the as found baseline of 0.98 lb/MBtu and to reduce emissions of SO{sub 2} by 50%. Since the unit currently fires a blend of high sulfur Illinois coal and low sulfur Kentucky coal to meet an SO{sub 2} limit of 1.8 lb/MBtu, the goal at this site was amended to meeting this limit while increasing the fraction of high sulfur coal to 57% from the current 15% level. GR-SI requires injection of natural gas into the furnace at the level of the top burner row, creating a fuel-rich zone in which NO{sub x} formed in the coal zone is reduced to N{sub 2}. Recycled flue gas is used to increase the reburning fuel jet momentum, resulting in enhanced mixing. Recycled flue gas is also used to cool the top row of burners which would not be in service during GR operation. Dry hydrated lime sorbent is injected into the upper furnace to react with SO{sub 2}, forming solid CaSO{sub 4} and CaSO{sub 3}, which are collected by the ESP. The system was designed to inject sorbent at a rate corresponding to a calcium (sorbent) to sulfur (coal) molar ratio of 2.0. The SI system design was optimized with respect to gas temperature, injection air flow rate, and sorbent dispersion. Sorbent injection air flow is equal to 3% of the combustion air. The design includes modifications of the ESP, sootblowing, and ash handling systems.

  11. Tehachapi solar thermal system first annual report

    SciTech Connect (OSTI)

    Rosenthal, A. [Southwest Technology Development Inst., Las Cruces, NM (US)

    1993-05-01T23:59:59.000Z

    The staff of the Southwest Technology Development Institute (SWTDI), in conjunction with the staff of Industrial Solar Technology (IST), have analyzed the performance, operation, and maintenance of a large solar process heat system in use at the 5,000 inmate California Correctional Institution (CCI) in Tehachapi, CA. This report summarizes the key design features of the solar plant, its construction and maintenance histories through the end of 1991, and the performance data collected at the plant by a dedicated on-site data acquisition system (DAS).

  12. Facilities management system (FMS). Final report

    SciTech Connect (OSTI)

    NONE

    1992-04-01T23:59:59.000Z

    The remainder of this report provides a detailed, final status of Andersen Consulting`s participation in the FMS systems implementation project and offers suggestions for continued FMS improvements. The report presents the following topics of discussion: (1) Summary and Status of Work (2) Recommendations for Continued Success (3) Contract Deliverables and Client Satisfaction The Summary and Status of Work section presents a detailed, final status of the FMS project at the termination of Andersen`s full-time participation. This section discusses the status of each FMS sub-system and of the Andersen major project deliverables. The Recommendations section offers suggestions for continued FMS success. The topics discussed include recommendations for each of the following areas: (1) End User and Business Operations (2) AISD; Development and Computer Operations (3) Software (4) Technical Platform (5) Control Procedures The Contract Deliverables and Client Satisfaction section discusses feedback received from Johnson Controls management and FMS system users. The report also addresses Andersen`s observations from the feedback.

  13. Description of the system planning process at Florida Power Corporation. Task I. Report No. FC-5237-1

    SciTech Connect (OSTI)

    None

    1980-01-01T23:59:59.000Z

    One of the means of evaluating a new technology is to have it considered by a utility company, run through the system planning, and thus scrutinized by a potential user of the new technology in a manner directly drawn from the user's methods of decision making on new capacity additions. By having Florida Power Corporation (FPC), a company with real potential for the future use of ocean thermal energy conversion (OTEC), exercise its system planning methods to consider this possible source of future generating capacity, a number of highly useful results will be obtained. The overall study of the application of system planning to OTEC is being carried out in four tasks. This report covers task-1 which provides a description of the existing system and the planning process of Florida Power Corporation. (WHK)

  14. Hydrogen energy systems studies. Final technical report

    SciTech Connect (OSTI)

    Ogden, J.M.; Kreutz, T.; Kartha, S.; Iwan, L.

    1996-08-13T23:59:59.000Z

    The results of previous studies suggest that the use of hydrogen from natural gas might be an important first step toward a hydrogen economy based on renewables. Because of infrastructure considerations (the difficulty and cost of storing, transmitting and distributing hydrogen), hydrogen produced from natural gas at the end-user`s site could be a key feature in the early development of hydrogen energy systems. In the first chapter of this report, the authors assess the technical and economic prospects for small scale technologies for producing hydrogen from natural gas (steam reformers, autothermal reformers and partial oxidation systems), addressing the following questions: (1) What are the performance, cost and emissions of small scale steam reformer technology now on the market? How does this compare to partial oxidation and autothermal systems? (2) How do the performance and cost of reformer technologies depend on scale? What critical technologies limit cost and performance of small scale hydrogen production systems? What are the prospects for potential cost reductions and performance improvements as these technologies advance? (3) How would reductions in the reformer capital cost impact the delivered cost of hydrogen transportation fuel? In the second chapter of this report the authors estimate the potential demand for hydrogen transportation fuel in Southern California.

  15. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 3. Measurement

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Aquin, D.; Beloat, B.; Epps, B.

    1993-04-01T23:59:59.000Z

    As part of a study of unaccounted-for gas (UAF) at the Southern California Gas Company, volume III of the six-volume set contains the results of measurement factors analysis, including both estimates of UAF due to fixed-factor assumptions and meter accuracy. Accurate measurement of gas volume is a function of the meter and the factors used to adjust the meter read. If the meter registers slow or fast, the actual gas volume passing through the meter will not be measured true. The estimated UAF volume from all measurement elements resulted in an overall net under-measurement of the 1991 gas volume in the SoCalGas system of 8,048,800 thousand cubic feet. Appendices include tabular numerical and graphic information on measurement parameters and other supplemental data.

  16. Environmental Systems Research, FY-99 Annual Report

    SciTech Connect (OSTI)

    Miller, David Lynn

    2000-01-01T23:59:59.000Z

    The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the Idaho National Engineering and Environmental Laboratory (INEEL). The purpose for strengthening technical capabilities of the INEEL is to provide the technical base to serve effectively as the Environmental Management Laboratory for the Department of Energy's Office of Environmental Management (EM). The original portfolio of research activities was assembled after an analysis of the EM technology development and science needs as gathered by the Site Technology Coordination Groups (STCGs) complex-wide. Current EM investments in science and technology throughout the research community were also included in this analysis to avoid duplication of efforts. This is a progress report for the second year of the ESR Program (Fiscal Year 99). A report of activities is presented for the five ESR research investment areas: (a) Transport Aspects of Selective Mass Transport Agents, (b) Chemistry of Environmental Surfaces, (c) Materials Dynamics, (d) Characterization Science, and (e) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas, are described.

  17. Environmental Systems Research FY-99 Annual Report

    SciTech Connect (OSTI)

    Miller, D.L.

    2000-01-01T23:59:59.000Z

    The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the Idaho National Engineering and Environmental Laboratory (INEEL). The purpose for strengthening technical capabilities of the INEEL is to provide the technical base to serve effectively as the Environmental Management Laboratory for the Department of Energy's Office of Environmental Management (EM). The original portfolio of research activities was assembled after an analysis of the EM technology development and science needs as gathered by the Site Technology Coordination Groups (STCGs) complex-wide. Current EM investments in science and technology throughout the research community were also included in this analysis to avoid duplication of efforts. This is a progress report for the second year of the ESR Program (Fiscal Year 99). A report of activities is presented for the five ESR research investment areas: (a) Transport Aspects of Selective Mass Transport Agents, (b) Chemistry of Environmental Surfaces, (c) Materials Dynamics, (d) Characterization Science, and (e) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas, are described.

  18. Human factors engineering control-room-design review/audit report: Palo Verde Nuclear Generating Station, Arizona Public Service Company

    SciTech Connect (OSTI)

    Savage, J.W.; Lappa, D.A.

    1981-10-09T23:59:59.000Z

    A human factors engineering design review of the Palo Verde control room simulator was performed at the site on September 15 through September 17, 1981. Observed human factors design discrepancies were given priority ratings. This report summarizes the team's observations of the control room design and layout and of the control room operators' interface with the control room environment. A list of the human factors strengths observed in the Palo Verde control room simulator is given.

  19. Working Group Report on - Space Nuclear Power Systems and Nuclear...

    Energy Savers [EERE]

    Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D "Even...

  20. Building integrated photovoltaic systems analysis: Preliminary report

    SciTech Connect (OSTI)

    none,

    1993-08-01T23:59:59.000Z

    The National Renewable Energy Laboratory (NREL) has estimated that the deployment of photovoltaics (PV) in the commercial buildings sector has the potential to contribute as much as 40 gigawatts peak electrical generation capacity and displace up to 1.1 quads of primary fuel use. A significant portion of this potential exists for smaller buildings under 25,000 square feet (2,300 square meters) in size or two stories or less, providing a strong cross over potential for residential applications as well. To begin to achieve this potential, research is needed to define the appropriate match of PV systems to energy end-uses in the commercial building sector. This report presents preliminary findings for a technical assessment of several alternative paths to integrate PV with building energy systems.

  1. Washington Closure Hanford System Engineer Program FY2010 Annual Report

    SciTech Connect (OSTI)

    J.N. Winters

    2010-11-02T23:59:59.000Z

    This report is a summary of the assessments of the vital safety systems (VSS) that are administered under WCH’s system engineer program.

  2. WRAP operational test report drum non destructive examination system

    SciTech Connect (OSTI)

    HUMPHRYS, K.L.

    1999-07-01T23:59:59.000Z

    This operational test report was performed to verify the WRAP Facility Drum Non-Destructive Examination systems operate in accordance with the system designs and specifications.

  3. 2014 Annual Merit Review Results Report - Hybrid Vehicle Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Vehicle Systems Technologies 2014 Annual Merit Review Results Report - Hybrid Vehicle Systems Technologies Merit review of DOE Vehicle Technologies research activities...

  4. 2012 Annual Merit Review Results Report - Hybrid Vehicle Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Vehicle Systems Technologies 2012 Annual Merit Review Results Report - Hybrid Vehicle Systems Technologies Merit review of DOE Vehicle Technologies research activities...

  5. Integrated radwaste treatment system. Final report

    SciTech Connect (OSTI)

    Baker, M.N.; Houston, H.M.

    1997-10-01T23:59:59.000Z

    In May 1988, the West Valley Demonstration Project (WVDP) began pretreating liquid high-level radioactive waste (HLW). This HLW was produced during spent nuclear fuel reprocessing operations that took place at the Western New York Nuclear Service Center from 1966 to 1972. Original reprocessing operations used plutonium/uranium extraction (PUREX) and thorium extraction (THOREX) processes to recover usable isotopes from spent nuclear fuel. The PUREX process produced a nitric acid-based waste stream, which was neutralized by adding sodium hydroxide to it. About two million liters of alkaline liquid HLW produced from PUREX neutralization were stored in an underground carbon steel tank identified as Tank 8D-2. The THOREX process, which was used to reprocess one core of mixed uranium-thorium fuel, resulted in about 31,000 liters of acidic waste. This acidic HLW was stored in an underground stainless steel tank identified as Tank 8D-4. Pretreatment of the HLW was carried out using the Integrated Radwaste Treatment System (IRTS), from May 1988 until May 1995. This system was designed to decontaminate the liquid HLW, remove salts from it, and encapsulate the resulting waste into a cement waste form that achieved US Nuclear Regulatory Commission (NRC) criteria for low-level waste (LLW) storage and disposal. A thorough discussion of IRTS operations, including all systems, subsystems, and components, is presented in US Department of Energy (DOE) Topical Report (DOE/NE/44139-68), Integrated Radwaste Treatment System Lessons Learned from 2 1/2 Years of Operation. This document also presents a detailed discussion of lessons learned during the first 2 1/2 years of IRTS operation. This report provides a general discussion of all phases of IRTS operation, and presents additional lessons learned during seven years of IRTS operation.

  6. Utilization of geothermal energy for methane production for J. A. Albertson Land and Cattle Company. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-07-01T23:59:59.000Z

    The feasibility of an integrated system to utilize a geothermal resource for a bioconversion plant. This integrated facility would use the manure from approximately 30,000 head of feedlot cattle as a feedstock for an anaerobic digestion plant. The findings on engineering design, geological assessment, environmental, economic, and institutional requirements of the proposed project are summarized. (MHR)

  7. UBC Social Ecological Economic Development Studies (SEEDS) Student Report Elevator Drive Systems Energy Consumption Study Report

    E-Print Network [OSTI]

    Energy Consumption Study Report Benny ChunYin Chan University of British Columbia EECE 492 April 6th the current status of the subject matter of a project/report". #12;Elevator Drive Systems Energy Consumption Study Report April 2012 0 2012 Elevator Drive Systems Energy Consumption Study Report Benny CY Chan UBC

  8. Performance of the Southern California Edison Company Stirling dish

    SciTech Connect (OSTI)

    Lopez, C.W. [Southern California Edison Co., Rosemead, CA (United States); Stone, K.W. [Mako Enterprises, Huntington Beach, CA (United States)

    1993-10-01T23:59:59.000Z

    McDonnell Douglas Astronautics Company (MDAC) and United Stirling AB of Sweden (USAB) formed a joint venture in 1982 to develop and produce a Stirling dish solar generating system. In this report, the six year development and testing program continued by the Southern California Edison Company (SCE) is described. Each Stirling dish module consists of a sun tracking dish concentrator developed by the MDAC and a Stirling engine driven power conversion unit (PCU) developed by USAB. The Stirling dish system demonstrated twice the peak and daily solar-to-electric conversion efficiency of any other system then under development. This system continues to set the performance standard for solar to electric systems being developed in the early 1990`s. Test data are presented and used to estimate the performance of a commercial system.

  9. Potassium emission absorption system. Topical report 12

    SciTech Connect (OSTI)

    Bauman, L.E.

    1995-04-01T23:59:59.000Z

    The Potassium Emission Absorption System is one of the advanced optical diagnostics developed at Mississippi State University to provide support for the demonstration of prototype-scale coal-fired combustion magnetohydrodynamic (MHD) electrical power generation. Intended for application in the upstream of an MHD flow, the system directly measures gas temperature and neutral potassium atom number density through spectroscopic emission absorption techniques. From these measurements the electron density can be inferred from a statistical equilibrium calculation and the electron conductivity in the MHD channel found by use of an electron mobility model. The instrument has been utilized for field test measurements on MHD facilities for almost a decade and has been proven to provide useful measurements as designed for MHD nozzle, channel, and diffuser test sections. The theory of the measurements, a system description, its capabilities, and field test measurement results are reported here. During the development and application of the instrument several technical issues arose which when addressed advanced the state of the art in emission absorption measurement. Studies of these issues are also reported here and include: two-wavelength measurements for particle-laden flows, potassium D-line far wing absorption coefficient, bias in emission absorption measurements arising from dirty windows and misalignments, non-coincident multiwavelength emission absorption sampling errors, and lineshape fitting for boundary layer flow profile information. Although developed for NLHD application, the instrument could be applied to any high temperature flow with a resonance line in the 300 to 800 nm range, for instance other types of flames, rocket plumes or low temperature plasmas.

  10. Competitor Analysis Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    chemical company providing the household and industrial detergent, personal care, lubricant, oilfield

  11. Superfund Record of Decision (EPA Region 2): Marathon Battery Company site, Cold Spring, Putnam County, New York, September 1986. Final report

    SciTech Connect (OSTI)

    Not Available

    1986-09-30T23:59:59.000Z

    The Marathon Battery Company (MBC) site, located in the Village of Gold Spring, Putnam County, NY, has two components: the East Foundry Cove Marsh (EFCM), and Constitution Marsh. The site began as a battery-manufacturing plant in 1952, producing military and commercial batteries for a period of 27 years. Approximately 50,000 kg of cadmium were discharged into the EFCM as a result of MBC's wastewater-treatment system. In 1965 the New York State Department of Health ordered the plant to disconnect its industrial discharge from the Village's sanitary sewer upon concluding that the battery plant's process effluent could not be managed by a new proposed sewage-treatment system. The primary contaminants of concern include: cadmium, cobalt, and nickel. The remedial action for the EFCM component of the site includes hydraulic dredging of sediments; sediment chemical fixation; dredging, water treatment and disposal, marsh restoration, and long-term monitoring. The estimated capital cost for both remedial components is $16,640,000 with OandM costs of $3,530,000 for the first year; $180,000 for years 2-5; and $127,000 for years 6-30.

  12. Pentek metal coating removal system: Baseline report

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  13. Consumer Products Companies Company Website Headquarters

    E-Print Network [OSTI]

    McGaughey, Alan

    . www.coach.com New York, NY Coca-Cola Company www.thecoca-colacompany.com Atlanta, GA Cole & Ashcroft L

  14. Buried waste containment system materials. Final Report

    SciTech Connect (OSTI)

    Weidner, J.R.; Shaw, P.G.

    1997-10-01T23:59:59.000Z

    This report describes the results of a test program to validate the application of a latex-modified cement formulation for use with the Buried Waste Containment System (BWCS) process during a proof of principle (POP) demonstration. The test program included three objectives. One objective was to validate the barrier material mix formulation to be used with the BWCS equipment. A basic mix formula for initial trials was supplied by the cement and latex vendors. The suitability of the material for BWCS application was verified by laboratory testing at the Idaho National Engineering and Environmental Laboratory (INEEL). A second objective was to determine if the POP BWCS material emplacement process adversely affected the barrier material properties. This objective was met by measuring and comparing properties of material prepared in the INEEL Materials Testing Laboratory (MTL) with identical properties of material produced by the BWCS field tests. These measurements included hydraulic conductivity to determine if the material met the US Environmental Protection Agency (EPA) requirements for barriers used for hazardous waste sites, petrographic analysis to allow an assessment of barrier material separation and segregation during emplacement, and a set of mechanical property tests typical of concrete characterization. The third objective was to measure the hydraulic properties of barrier material containing a stop-start joint to determine if such a feature would meet the EPA requirements for hazardous waste site barriers.

  15. Opis: Reliable Distributed Systems in OCaml EPFL Technical Report NSL-REPORT-2008-001

    E-Print Network [OSTI]

    Kuncak, Viktor

    Opis: Reliable Distributed Systems in OCaml EPFL Technical Report NSL-REPORT-2008-001 Pierre provide an excellent vehicle for developing and debugging distributed systems. We present Opis, a functional-reactive approach for de- veloping distributed systems in Objective Caml. In Opis, a protocol

  16. Acceptance test report for the mobile color camera system

    SciTech Connect (OSTI)

    Castleberry, J.L., Fluor Daniel Hanford

    1997-02-27T23:59:59.000Z

    The purpose of this report is to present test data recorded during acceptance testing of the Mobile Color Camera System (MCCS).

  17. Occurrence Reporting and Processing System (ORPS) - Receipt of...

    Office of Environmental Management (EM)

    Receipt of Administrative Order Relative to the Management of Hazardous Nitrate Salt Bearing Waste Drums at LANL Occurrence Reporting and Processing System (ORPS) - Receipt of...

  18. Energy Department Expands Gas Gouging Reporting System to Include...

    Energy Savers [EERE]

    Washington, DC - Energy Secretary Samuel W. Bodman announced today that the Department of Energy has expanded its gas gouging reporting system to include a toll-free telephone...

  19. Gas Companies Program (Tennessee)

    Broader source: Energy.gov [DOE]

    The Gas Companies program is a set of rules that encourage the development of the natural gas industry in Tennessee. They empower gas companies to lay piped and extend conductors through the...

  20. The impact of electric vehicles on the Southern California Edison System. Final report

    SciTech Connect (OSTI)

    Ford, A.

    1992-07-01T23:59:59.000Z

    This report describes the results of the first phase of an investigation of the impacts of electric vehicles (EVs) in southern California. The investigation focuses on the Southern California Edison Company (SCE) which provides electric service for approximately 60% of southern California. The project is supported by the ``Air Quality Impacts of Energy Efficiency`` Program of the California Institute for Energy Efficiency (CIEE). The first phase of the research is organized around how EVs might be viewed by customers, vehicle manufacturers and electric utility companies. The vehicle manufacturers` view has been studied with special emphasis on the role of marketable permit systems. The utilities` view of EVs is the subject of this report. The review is particularly important as several case studies of EVs in southern California have been conducted in recent years. The dynamics of a growing population of EVs is explained. Chapter 5 explains a simple method of deriving the electricity demands which could result from the operation of EVs in southern California. The method is demonstrated for several simple examples and then used to find the demands associated with each of the eight EV scenarios. Chapter 6 reports the impacts on SCE operations from the new demands for electricity. Impacts are summarized in terms of system operating costs, reliability of service, and changes in the utility`s average electric rate. Chapter 7 turns to the emissions of air pollutants released by the operation of EVs, conventional vehicles (CVs) and power plants. Chapter 8 takes the air pollution analysis one step further by examining the possible reduction in ambient ozone concentration in southern California.

  1. Computerized Reporting of Energy Conservation Progress 

    E-Print Network [OSTI]

    Troyan, J. E.

    1979-01-01T23:59:59.000Z

    Reporting of energy conservation progress, particularly by companies with a multiplicity of Plants and products, can be facilitated by application of data processing systems. Experience with the development and use of a specific computer program...

  2. Pipeline safety. Information on gas distribution system operators reporting unaccounted for gas

    SciTech Connect (OSTI)

    Not Available

    1986-02-01T23:59:59.000Z

    According to Department of Transportation records, 92 of the 1491 gas distribution system operators reported high levels of unaccounted for gas (unaccounted for gas is the difference between the amount of gas purchased and sold) for 1984, the latest year for which data were available. Of the 92 gas system operators, 64 were municipals (gas systems owned by a governmental entity, such as a city or county) and 28 were nonmunicipals. Based on the data we reviewed, these 92 gas systems did not report any accidents during calendar year 1984. Part I provides more details on the unaccounted for gas of municipal gas systems. Federal and industry officials consider that unaccounted for gas in excess of 15% of gas purchases high and worthy of investigation. High levels of unaccounted for gas can occur for a number of reasons, including errors in metering and billing, not accounting for gas used by city or company facilities, and leaking gas pipelines. While it may, a leak does not always indicate a safety problem. For example, a slow leak in an open area may not be a safety hazard. The Secretary has the authority to regulate any liquid deemed hazardous when transported by pipeline, and therefore could regulate hazardous liquids not currently regulated including methanol and carbon dioxide. However, the Department of Transportation has no plans to regulate any additional liquids. Part II provides more details. 4 figs., 2 tabs.

  3. Contract Management Using Industrial Energy Management & Reporting Systems

    E-Print Network [OSTI]

    Robinson, J. E.

    2011-01-01T23:59:59.000Z

    Energy Management and Reporting Systems (EMRS) are rule-based control systems with a record of reducing energy usage and CO2e emissions while optimizing electrical generation in a real time environment. The rule set successfully optimizes energy...

  4. Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report

    SciTech Connect (OSTI)

    Petrecky, James; Ashley, Christopher

    2014-07-21T23:59:59.000Z

    Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuel cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.

  5. Market Research Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    development - Market research for enterprise and education adoption - Plan and execute a company-wide pingMarket Research Company Description: A company focused on developing web-based graphical and future products and then develop the necessary strategies and collateral to stay on the bleeding edge

  6. EMERGING RENEWABLES PROGRAM SYSTEMS VERIFICATION REPORT

    E-Print Network [OSTI]

    survey that measured customer experience in applying to the ERP, receiving utility interconnection, renewable energy, shading, solar, system performance, system verification, utility interconnection, wind #12

  7. Ris Energy Report 7 Future low carbon energy systems

    E-Print Network [OSTI]

    Risř Energy Report 7 Future low carbon energy systems Reprint of summary and recommendations Risř-R-1651(EN) October 2008 Edited by Hans Larsen and Leif Sřnderberg Petersen #12;Risř Energy Report 7 Preface This Risř Energy Report, the seventh of a series that began in 2002, takes as its point

  8. Radiation Exposure Monitoring Systems Data Reporting Guide

    Broader source: Energy.gov [DOE]

    Instructions for preparing occupational exposure data for submittal to the Radiation Exposure Monitoring System (REMS) repository.

  9. Geothermal: Sponsored by OSTI -- ESMERALDA ENERGY COMPANY FINAL...

    Office of Scientific and Technical Information (OSTI)

    ESMERALDA ENERGY COMPANY FINAL SCIENTIFIC TECHNICAL REPORT, January 2008, EMIGRANT SLIMHOLE DRILLING PROJECT, DOE GRED III (DE-FC36-04GO14339) Geothermal Technologies Legacy...

  10. Groundwater Remediation Systems Quarterly Operations Report

    E-Print Network [OSTI]

    .......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 30% NA 1062

  11. Groundwater Remediation Systems Quarterly Operations Report

    E-Print Network [OSTI]

    .......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 Standby NA

  12. Groundwater Remediation Systems Quarterly Operations Report

    E-Print Network [OSTI]

    .......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby-

  13. Groundwater Remediation Systems Quarterly Operations Report

    E-Print Network [OSTI]

    .......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System........................................ 6 = ethylene dibromide * System dismantlement for the Carbon Tetrachloride system was completed in 2010. ** EDB Standby NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC 7 Operate- 14 Standby- 1 100% 1 1063

  14. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    SciTech Connect (OSTI)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01T23:59:59.000Z

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  15. QER- Comment of Southern Company

    Broader source: Energy.gov [DOE]

    Southern Company Services, Inc., as agent for Alabama Power Company, Georgia Power Company, Gulf Power Company, and Mississippi Power Company, (collectively, “Southern Companies”), are pleased to hereby provide their comments to the Department of Energy as it prepares the Quadrennial Energy Review. If there is anything else that we can do in this regard, please feel free to contact us.

  16. ASRS: The Case for Confidential Incident Reporting Systems In April 2001, the world's largest confidential voluntary aviation reporting system, the

    E-Print Network [OSTI]

    the Federal Aviation Administration (FAA) and National Aeronautics and Space Administration (NASA the aviation community, both individually, and collectively, could place a high degree of trust. The FAA confidential voluntary aviation reporting system, the NASA Aviation Safety Reporting System (ASRS), celebrated

  17. The Business Case for Fuel Cells: Why Top Companies are Purchasing Fuel Cells Today

    E-Print Network [OSTI]

    by numerous organizations around the world. This report profiles several companies leasing fuel cell vehicles, but there are hundreds of fuel cell vehicles from all the major automakers on the road around the world, and numerous-To-Energy recovery system Top right: IKEA`s GM/Opel Hydrogen3 fuel cell vehicle deployed in Germany Bottom right

  18. Computerized Accident Incident Reporting System | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and other accidents that occur during DOE operations. CAIRS is a Government computer system and, as such, has security requirements that must be followed. Access to the...

  19. Advanced lubrication systems and materials. Final report

    SciTech Connect (OSTI)

    Hsu, S.

    1998-05-07T23:59:59.000Z

    This report described the work conducted at the National Institute of Standards and Technology under an interagency agreement signed in September 1992 between DOE and NIST for 5 years. The interagency agreement envisions continual funding from DOE to support the development of fuel efficient, low emission engine technologies in terms of lubrication, friction, and wear control encountered in the development of advanced transportation technologies. However, in 1994, the DOE office of transportation technologies was reorganized and the tribology program was dissolved. The work at NIST therefore continued at a low level without further funding from DOE. The work continued to support transportation technologies in the development of fuel efficient, low emission engine development. Under this program, significant progress has been made in advancing the state of the art of lubrication technology for advanced engine research and development. Some of the highlights are: (1) developed an advanced high temperature liquid lubricant capable of sustaining high temperatures in a prototype heat engine; (2) developed a novel liquid lubricant which potentially could lower the emission of heavy duty diesel engines; (3) developed lubricant chemistries for ceramics used in the heat engines; (4) developed application maps for ceramic lubricant chemistry combinations for design purpose; and (5) developed novel test methods to screen lubricant chemistries for automotive air-conditioning compressors lubricated by R-134a (Freon substitute). Most of these findings have been reported to the DOE program office through Argonne National Laboratory who manages the overall program. A list of those reports and a copy of the report submitted to the Argonne National Laboratory is attached in Appendix A. Additional reports have also been submitted separately to DOE program managers. These are attached in Appendix B.

  20. Groundwater Remediation Systems Quarterly Operations Report

    E-Print Network [OSTI]

    .......................................... 5-1 6. OU III Carbon Tetrachloride Pump and Treat System ........................................ 6 for the Carbon Tetrachloride system was completed in 2010. ** EDB has only been detected in the influent at trace and Recirculate Tritium 4 Operate- 9 Standby- 7 100% NA 180 Industrial Park Recirculation/ In-Well (AS/Carbon) VOC

  1. Report on the SLC control system

    SciTech Connect (OSTI)

    Phinney, N.

    1985-05-01T23:59:59.000Z

    The SLC control system is based on a VAX 11/780 Host computer with approximately 50 microprocessor clusters which provide distributed intelligence and control of all CAMAC interface modules. This paper will present an overview of the system including current status and a description of the software architecture and communication protocols. 8 refs.

  2. Wholebody radiation counting system. Final report

    SciTech Connect (OSTI)

    Fechter, G.M.

    1985-05-01T23:59:59.000Z

    The purpose of this research was to develop a system that would allow the Health Physics staff of the Nuclear Engineering Department of Rensselaer Polytechnic Institute to conduct wholebody radiation counting of all assigned personnel and to determine if a multiple-crystal arrangement had any benefits over the single-crystal system. The research had three main objectives: to design and construct the electronic hardware necessary to collect data from a series of three NaI(Tl) scintilation crystals; to develop the computer software necessary to interpret this data and calculate concentrations present within those individuals tested; and to interface the Helgeson Wholebody Counter with the Vax 11/750 Computer System. This system includes a Texas Instruments TM990-101M Microcomputer which acts as the main control unit for the operator and as the interface with the Vax computer. Additionally, the final system included a computer interface and data acquisition module and it uses a Digital Equipment Corporation VAX 11/750 Computer System for a majority of the data manipulation. This system, as all wholebody counting systems, is characterized by its ability to detect low levels of radionuclide concentration while maintaining adequate resolution to identify the exact isotopes present within the person being counted.

  3. TESLA Report 2003-08 Cavity control system

    E-Print Network [OSTI]

    with signal and power considerations is presented. Two alternative simulation models of cavity control systemTESLA Report 2003-08 Cavity control system essential modeling for TESLA linear accelerator Tomasz' interaction point and high beam luminosity. The complex control system for the relativistic beam has been

  4. Photovoltaic systems for export application. Informal report

    SciTech Connect (OSTI)

    Duffy, J.; Campbell, H.; Sajo, A.; Sanz, E. [Univ. of Lowell, MA (United States)

    1988-01-31T23:59:59.000Z

    One approach to improving the competitiveness of photovoltaic systems is the development of designs specifically for export applications. In other words, where is it appropriate in a system design to incorporate components manufactured and/or assembled in the receiving country in order to improve the photovoltaic exports from the US? What appears to be needed is a systematic method of evaluating the potential for export from the US of PV systems for various application in different countries. Development of such a method was the goal of this project.

  5. Power systems development facility. Quarterly report, October 1--December 31, 1996

    SciTech Connect (OSTI)

    NONE

    1997-05-01T23:59:59.000Z

    This quarterly technical progress report summarizes the work completed during the fourth ID quarter, October 1 through December 31, 1996, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled {open_quotes}Hot Gas Cleanup Test Facility for ID Gasification and Pressurized Combustion.{close_quotes} The objective of this project, herein referred to as the Power Systems Development Facility (PSDF), is to evaluate hot gas particle control technologies Using coal-derived gas streams. This project entails the design, construction, installation, and use of a flexible test facility which can operate under realistic Gasification and combustion conditions. The major particulate control device (PCD) issues to be addressed include the integration of the PCDs into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. During this quarter considerable effort was expended in finalizing drawings and technical information for bid packages in support of the Request for Quotation (RFQ) for the fixed-price construction of the Foster Wheeler train. The packages were finalized and released for bids from seven companies at the beginning of November. A prebid meeting as held in mid-November when representatives from the interested companies toured the site and sought clarification on certain issues. Six bids were received by the end of December. Discussions were also held with a number of labor brokers to provide construction Support. Their bids are being evaluated in conjunction with those for the RFQ.

  6. Energy Service Companies

    Broader source: Energy.gov [DOE]

    Energy service companies (ESCOs) develop, design, build, and fund projects that save energy, reduce energy costs, decrease operations and maintenance costs at their customers' facilities.

  7. Advanced Turbine Systems Program. Topical report

    SciTech Connect (OSTI)

    NONE

    1993-03-01T23:59:59.000Z

    The Allison Gas Turbine Division (Allison) of General Motors Corporation conducted the Advanced Turbine Systems (ATS) program feasibility study (Phase I) in accordance with the Morgantown Energy Technology Center`s (METC`s) contract DE-AC21-86MC23165 A028. This feasibility study was to define and describe a natural gas-fired reference system which would meet the objective of {ge}60% overall efficiency, produce nitrogen oxides (NO{sub x}) emissions 10% less than the state-of-the-art without post combustion controls, and cost of electricity of the N{sup th} system to be approximately 10% below that of the current systems. In addition, the selected natural gas-fired reference system was expected to be adaptable to coal. The Allison proposed reference system feasibility study incorporated Allison`s long-term experience from advanced aerospace and military technology programs. This experience base is pertinent and crucial to the success of the ATS program. The existing aeroderivative technology base includes high temperature hot section design capability, single crystal technology, advanced cooling techniques, high temperature ceramics, ultrahigh turbomachinery components design, advanced cycles, and sophisticated computer codes.

  8. System for reducing heat losses from indoor swimming pools by use of automatic covers. Final report, October 1, 1993--September 30, 1995

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This final report is an account of the principal activities of Lof Energy Systems, Inc. in a two-year project funded by the Energy Related Inventions Program (ERIP) of the U.S. Department of Energy. The primary objective has been the development of a fully practical and economical system for saving energy in indoor swimming pools by use of motorized covers. The goal is wide-spread use of a fully developed product, in institutional swimming pools. Four major tasks, depicted in the accompanying Performance Schedule, have been completed, and one other has been initiated and its completion committed. Principal accomplishments have been the selection and improvement of cover materials and designs, lengthening and strengthening of reels and improvements in motorized components and their control, design and installation of pool covers in full scale demonstration and evaluation of fully developed commercial system, preparation and dissemination of manuals and reports, finalization of arrangements for Underwriters Laboratory certification of products, and final report preparation and submission. Of greatest significance has been the successful demonstration of the fully developed system and the verification and reporting by an energy consultant of the large savings resulting from pool cover use. Probably the best evidence of success of the DOE-ERIP project in advancing this invention to a commercial stage is its acceptance for sale by the Lincoln Equipment Company, a national distributor of swimming pool supplies and equipment. A copy of the relevant page in the Lincoln catalog is included in this report as Annex A. Representatives of that company now offer Tof motorized pool cover systems to their pool owner customers. In addition to the plans for securing UL certification the company expects to continue making design improvements that can increase system reliability, durability, and cost-effectiveness.

  9. Final Report Advanced Quasioptical Launcher System

    SciTech Connect (OSTI)

    Jeffrey Neilson

    2010-04-30T23:59:59.000Z

    This program developed an analytical design tool for designing antenna and mirror systems to convert whispering gallery RF modes to Gaussian or HE11 modes. Whispering gallery modes are generated by gyrotrons used for electron cyclotron heating of fusion plasmas in tokamaks. These modes cannot be easily transmitted and must be converted to free space or waveguide modes compatible with transmission line systems.This program improved the capability of SURF3D/LOT, which was initially developed in a previous SBIR program. This suite of codes revolutionized quasi-optical launcher design, and this code, or equivalent codes, are now used worldwide. This program added functionality to SURF3D/LOT to allow creating of more compact launcher and mirror systems and provide direct coupling to corrugated waveguide within the vacuum envelope of the gyrotron. Analysis was also extended to include full-wave analysis of mirror transmission line systems. The code includes a graphical user interface and is available for advanced design of launcher systems.

  10. The Financial Reporting System Public Data

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our InstagramStructureProposedPAGESafetyTed5,Audit ReportTheTheTheMarkets &

  11. Multi Megawatt Power System Analysis Report

    SciTech Connect (OSTI)

    Longhurst, Glen Reed; Harvego, Edwin Allan; Schnitzler, Bruce Gordon; Seifert, Gary Dean; Sharpe, John Phillip; Verrill, Donald Alan; Watts, Kenneth Donald; Parks, Benjamin Travis

    2001-11-01T23:59:59.000Z

    Missions to the outer planets or to near-by planets requiring short times and/or increased payload carrying capability will benefit from nuclear power. A concept study was undertaken to evaluate options for a multi-megawatt power source for nuclear electric propulsion. The nominal electric power requirement was set at 15 MWe with an assumed mission profile of 120 days at full power, 60 days in hot standby, and another 120 days of full power, repeated several times for 7 years of service. Of the numerous options considered, two that appeared to have the greatest promise were a gas-cooled reactor based on the NERVA Derivative design, operating a closed cycle Brayton power conversion system; and a molten lithium-cooled reactor based on SP-100 technology, driving a boiling potassium Rankine power conversion system. This study examined the relative merits of these two systems, seeking to optimize the specific mass. Conclusions were that either concept appeared capable of approaching the specific mass goal of 3-5 kg/kWe estimated to be needed for this class of mission, though neither could be realized without substantial development in reactor fuels technology, thermal radiator mass efficiency, and power conversion and distribution electronics and systems capable of operating at high temperatures. Though the gas-Brayton systems showed an apparent advantage in specific mass, differences in the degree of conservatism inherent in the models used suggests expectations for the two approaches may be similar. Brayton systems eliminate the need to deal with two-phase flows in the microgravity environment of space.

  12. Pentek concrete scabbling system: Baseline report; Summary

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek concrete scabbling system consists of the MOOSE{reg_sign} scabbler, the SQUIRREL{reg_sign}-I and SQUIRREL{reg_sign}-III scabblers, and VAC-PAC. The scabblers are designed to scarify concrete floors and slabs using cross section, tungsten carbide tipped bits. The bits are designed to remove concrete in 3/8 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation during the human factors assessment focused on two main areas: noise and dust.

  13. Harrison Radiator Division's Energy Management, Reporting and Accounting System

    E-Print Network [OSTI]

    Goubeaux, R. J.

    HARRISON RADIATOR DIVISION'S ENERGY MANAGEMENT, REPORTING and ACCOUNTING SYSTEM Ronald J. Goubeaux Harrison Radiator Division Lockport, New York ABSTRACT Energy management is essential for obtaining the lowest possible product..., farm equipment, small aircraft and other types of vehicles. The energy management, reporting and accounting system that is covered in this paper is operating in Harrison's West Complex of the New York Operations located in Lockport, Western...

  14. CESMCommunity Earth System Model CSL Accomplishments Report

    E-Print Network [OSTI]

    tropical cyclone structures and frequency statistics as well as propagating systems through the central cyclones, particularly its path and minimum low pressure, at several days lead time. High resolution paradigm beyond the artificial separation of the shallow and deep convection. This has lead to extensive

  15. KTeV beam systems design report

    SciTech Connect (OSTI)

    Bocean, V.; Childress, S.; Coleman, R. [and others

    1997-09-01T23:59:59.000Z

    The primary and secondary beams for the KTeV experiments E799-II and E832 are discussed. The specifications are presented and justified. The technical details of the implementation of the primary beam transport and stability are detailed. The target, beam dump, and radiation safety issues are discussed. The details of the collimation system for the pair of secondary beams are presented.

  16. Natural Resource System Report Back #1

    E-Print Network [OSTI]

    Discussed 1. Timber 2. Wastewater Treatment Systems 3. Wetlands, especially the wetland bank managed-Around: Currently working to increase resistance to rainwater infiltration · Wetland Bank, Drought ­ Impact: Unable to Manage Wetland Bank per Regulator (COE) Requirements #12;Existing Management Plans / Processes

  17. Foreign Energy Company Competitiveness: Background information

    SciTech Connect (OSTI)

    Weimar, M.R.; Freund, K.A.; Roop, J.M.

    1994-10-01T23:59:59.000Z

    This report provides background information to the report Energy Company Competitiveness: Little to Do With Subsidies (DOE 1994). The main body of this publication consists of data uncovered during the course of research on this DOE report. This data pertains to major government energy policies in each country studied. This report also provides a summary of the DOE report. In October 1993, the Office of Energy Intelligence, US Department of Energy (formerly the Office of Foreign Intelligence), requested that Pacific Northwest Laboratory prepare a report addressing policies and actions used by foreign governments to enhance the competitiveness of their energy firms. Pacific Northwest Laboratory prepared the report Energy Company Competitiveness Little to Do With Subsidies (DOE 1994), which provided the analysis requested by DOE. An appendix was also prepared, which provided extensive background documentation to the analysis. Because of the length of the appendix, Pacific Northwest Laboratory decided to publish this information separately, as contained in this report.

  18. Crusader Automated Docking System Phase 3 report

    SciTech Connect (OSTI)

    Jatko, W.B.; Goddard, J.S.; Ferrell, R.K.; Gleason, S.S.; Hicks, J.S.; Varma, V.K.

    1996-03-01T23:59:59.000Z

    The US Army is developing the next generation of battlefield artillery vehicles, including an advanced, self-propelled howitzer and a companion resupply vehicle. The resupply vehicle is intended to rendezvous with the howitzer near the battlefront and to upload ammunition to the howitzer. The Army has recommended that the vehicles incorporate robotics to increase safety, by allowing the crew to remain inside their vehicles during resupply operations. Oak Ridge National Laboratory has developed an autonomous docking system for a 6-D.F. robotic, ammunition transfer arm. The docking system augments the operator`s abilities by determining the position and orientation (pose) of a docking port. The pose is the location of the x, y, and z reference axes in 3-D space; and the orientation is the rotations--roll, pitch, and yaw--about those axes. Bye precisely determining the pose of the docking port, the robot can be instructed to move to the docking position without operator intervention. The system uses a video camera and frame grabber to digitize images of the special docking port. Custom algorithms were developed to recognize the port in the camera image, to determine the pose from its image features, and to distribute the results to the robot control computer. The system is loosely coupled to the robot and can be easily adapted to different mechanical configurations. The system has successfully demonstrated autonomous docking on a 24-in. tabletop robot and a 12-ft ammunition resupply robot. The update rate, measurement accuracy, continuous operation, and accuracy with obstructed view have been determined experimentally.

  19. Final Report of a CRADA Between Pacific Northwest National Laboratory and the Ford Motor Company (CRADA No. PNNL/265): “Deactivation Mechanisms of Base Metal/Zeolite Urea Selective Catalytic Reduction Materials, and Development of Zeolite-Based Hydrocarbon Adsorber Materials”

    SciTech Connect (OSTI)

    Gao, Feng; Kwak, Ja Hun; Lee, Jong H.; Tran, Diana N.; Peden, Charles HF; Howden, Ken; Cheng, Yisun; Lupescu, Jason; Cavattaio, Giovanni; Lambert, Christine; McCabe, Robert W.

    2013-02-14T23:59:59.000Z

    Reducing NOx emissions and particulate matter (PM) are primary concerns for diesel vehicles required to meet current LEV II and future LEV III emission standards which require 90+% NOx conversion. Currently, urea SCR as the NOx reductant and a Catalyzed Diesel Particulate Filter (CDPF) are being used for emission control system components by Ford Motor Company for 2010 and beyond diesel vehicles. Because the use of this technology for vehicle applications is new, the relative lack of experience makes it especially challenging to satisfy durability requirements. Of particular concern is being able to realistically simulate actual field aging of the catalyst systems under laboratory conditions. This is necessary both as a rapid assessment tool for verifying improved performance and certifiability of new catalyst formulations, and to develop a good understanding of deactivation mechanisms that can be used to develop improved catalyst materials. In addition to NOx and PM, the hydrocarbon (HC) emission standards are expected to become much more stringent during the next few years. Meanwhile, the engine-out HC emissions are expected to increase and/or be more difficult to remove. Since HC can be removed only when the catalyst becomes warm enough for its oxidation, three-way catalyst (TWC) and diesel oxidation catalyst (DOC) formulations often contain proprietary zeolite materials to hold the HC produced during the cold start period until the catalyst reaches its operating temperature (e.g., >200°C). Unfortunately, much of trapped HC tends to be released before the catalyst reaches the operating temperature. Among materials effective for trapping HC during the catalyst warm-up period, siliceous zeolites are commonly used because of their high surface area and high stability under typical operating conditions. However, there has been little research on the physical properties of these materials related to the adsorption and release of various hydrocarbon species found in the engine exhaust. For these reasons, automakers and engine manufacturers have difficulty improving their catalytic converters for meeting the stringent HC emission standards. In this collaborative program, scientists and engineers in the Institute for Integrated Catalysis at Pacific Northwest National Laboratory and at Ford Motor Company have investigated laboratory- and engine-aged SCR catalysts, containing mainly base metal zeolites. These studies are leading to a better understanding of various aging factors that impact the long-term performance of SCR catalysts and improve the correlation between laboratory and engine aging, saving experimental time and cost. We have also studied materials effective for the temporary storage of HC species during the cold-start period. In particular, we have examined the adsorption and desorption of various HC species produced during the combustion with different fuels (e.g., gasoline, E85, diesel) over potential HC adsorber materials, and measured the kinetic parameters to update Ford’s HC adsorption model. Since this CRADA has now been completed, in this final report we will provide brief summaries of most of the work carried out on this CRADA over the last several years.

  20. Marketing Plan Company Description

    E-Print Network [OSTI]

    Dahl, David B.

    productivity without the jitters/crash of normal energy drinks and shots. Short Project Name: Internet groups would generate the most profit? How can we cross-market/up-sell to our email database and 20K the model) Company Description: We are a rapidly growing, subscription-based, finance and technology company

  1. INL Control System Situational Awareness Technology Annual Report 2012

    SciTech Connect (OSTI)

    Gordon Rueff; Bryce Wheeler; Todd Vollmer; Tim McJunkin; Robert Erbes

    2012-10-01T23:59:59.000Z

    The overall goal of this project is to develop an interoperable set of tools to provide a comprehensive, consistent implementation of cyber security and overall situational awareness of control and sensor network implementations. The operation and interoperability of these tools will fill voids in current technological offerings and address issues that remain an impediment to the security of control systems. This report provides an FY 2012 update on the Sophia, Mesh Mapper, Intelligent Cyber Sensor, and Data Fusion projects with respect to the year-two tasks and annual reporting requirements of the INL Control System Situational Awareness Technology report (July 2010).

  2. Natural disasters and the gas pipeline system. Topical report, August 1994-June 1995

    SciTech Connect (OSTI)

    Atallah, S.; Saxena, S.; Martin, S.B.; Willowby, A.B.; Alger, R.

    1996-11-15T23:59:59.000Z

    Episodic descriptions are provided of the effect of the Loma Prieta earthquake (1989) on the gas pipeline systems of Pacific Gas & Electric Company and the City of Palo Alto and of the Northridge earthquake (1994) on Southern California Gas` pipeline system. The emergency response plans and activities of South Carolina Electric & Gas Company during hurricane Hugo (1989) and of City Gas Company of Florida and other small gas companies during hurricane Andrew (1992) are also reviewed. Descriptions of the great Flood of 1993 and its effects on the operations of Iowa-Illinois Gas & Electric Company and Laclede Gas Company and of the San Jacinto River Floods on the transmission lines of Valero Gas Co. are also provided. Local and federal regulatory requirements, and the current practices by the gas industry for dealing with natural disasters, such as through preventive measures (e.g., strapping of water heaters, excess flow valves), and the tracking of weather-related events are described. The important role that preplanning and coordination with the local emergency response bodies and other gas utilities plays during a natural disaster is examined.

  3. Fuel Retrieval System Design Verification Report

    SciTech Connect (OSTI)

    GROTH, B.D.

    2000-04-11T23:59:59.000Z

    The Fuel Retrieval Subproject was established as part of the Spent Nuclear Fuel Project (SNF Project) to retrieve and repackage the SNF located in the K Basins. The Fuel Retrieval System (FRS) construction work is complete in the KW Basin, and start-up testing is underway. Design modifications and construction planning are also underway for the KE Basin. An independent review of the design verification process as applied to the K Basin projects was initiated in support of preparation for the SNF Project operational readiness review (ORR). A Design Verification Status Questionnaire, Table 1, is included which addresses Corrective Action SNF-EG-MA-EG-20000060, Item No.9 (Miller 2000).

  4. W-026, acceptance test report manipulator system

    SciTech Connect (OSTI)

    Watson, T.L.

    1997-04-15T23:59:59.000Z

    The purpose of the WRAP Manipulator System Acceptance Test Plan (ATP) is to verify that the 4 glovebox sets of WRAP manipulator components, including rail/carriage, slave arm, master controller and auxiliary equipment, meets the requirements of the functional segments of 14590 specification. The demonstration of performance elements of the ATP are performed as a part of the Assembly specifications. Manipulator integration is integrated in the performance testing of the gloveboxes. Each requirement of the Assembly specification will be carried out in conjunction with glovebox performance tests.

  5. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1995-08-03T23:59:59.000Z

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  6. Illinois Company Implementing Solar Energy

    Office of Energy Efficiency and Renewable Energy (EERE)

    J.F. Family Limited Partnership has been awarded $191,000 through the Recovery Act toward the use of solar energy at its Lakefront Parkway property in Edwardsville, Ill., which is the company headquarters for J.F. Electric Inc. The funding will be used to install a 75-kW solar photovoltaic system on the building’s roof, creating electricity on-site and creating or saving a total of 14 jobs.

  7. Environmental assessment for the granting of US Navy easements near Pearl Harbor and Waikele Gulch Oahu, Hawaii to Hawaiian Electric Company, Inc. Final report

    SciTech Connect (OSTI)

    Luersen, P.; Wiley, M.; Hart, J.; Kanehiro, C.; Soloway, M.

    1994-09-23T23:59:59.000Z

    This document was prepared pursuant to the National Environmental Policy Act (NEPA: and Navy regulations (OPNAVINST 5090.1B)). The document addresses environmental impacts from the proposed granting of three easements to the Hawaiian Electric Company, Inc. (HECO) for the use of Navy property near Waikele Gulch, Pearl City and the Waiau Power Plant. HECO`s proposed Waiau-CIP, Part 2, Project requires installation, operation, and maintenance of steel transmission line poles and associated equipment on three Navy parcels crossed by the 7.8 mile project. Health risks from exposure to the electric and magnetic fields of 138-kV transmission lines are discussed.

  8. MCCAA (Mercer County Community Action Agency) residential ESCO (Energy Service Company) market study: (Technical progress report for the period January 1, 1986 through December 31, 1986)

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    The Mercer County Community Action Agency has become interested in the possibility of expanding the scope of their energy conservation activities to the larger population, those homeowners whose income disqualifies them for publicly-funded weatherization programs, but who may be willing to purchase similar energy reduction and comfort enhancing services from a private entity. This market study attempts to describe the potential market for residential energy management services in Mercer County and to offer relevant strategies for developing a for-profit, residential energy service company capable of responding to the specific market conditions uncovered.

  9. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 6. Databases

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Azma, M.

    1993-04-01T23:59:59.000Z

    As part of a study of unaccounted-for gas (UAF) at the Southern California Gas Company (SoCalGas), the last volume of the six-volume set contains the supporting data and discussions of the methods used to extract and organize data from SoCalGas billing records to support the analysis of study elements. An overview of the analytical approach is presented, and detailed information on the related computational logic, program design, and input data requirements is provided. An appendix contains input data file descriptions.

  10. Innovative technology summary report: Transportable vitrification system

    SciTech Connect (OSTI)

    NONE

    1998-09-01T23:59:59.000Z

    At the end of the cold war, many of the Department of Energy`s (DOE`s) major nuclear weapons facilities refocused their efforts on finding technically sound, economic, regulatory compliant, and stakeholder acceptable treatment solutions for the legacy of mixed wastes they had produced. In particular, an advanced stabilization process that could effectively treat the large volumes of settling pond and treatment sludges was needed. Based on this need, DOE and its contractors initiated in 1993 the EM-50 sponsored development effort required to produce a deployable mixed waste vitrification system. As a consequence, the Transportable Vitrification System (TVS) effort was undertaken with the primary requirement to develop and demonstrate the technology and associated facility to effectively vitrify, for compliant disposal, the applicable mixed waste sludges and solids across the various DOE complex sites. After 4 years of development testing with both crucible and pilot-scale melters, the TVS facility was constructed by Envitco, evaluated and demonstrated with surrogates, and then successfully transported to the ORNL ETTP site and demonstrated with actual mixed wastes in the fall of 1997. This paper describes the technology, its performance, the technology applicability and alternatives, cost, regulatory and policy issues, and lessons learned.

  11. Utility Battery Storage Systems Program report for FY93

    SciTech Connect (OSTI)

    Butler, P.C.

    1994-02-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Utility Battery Storage Systems Program, which is sponsored by the US Department of Energy`s Office of Energy Management. In this capacity, Sandia is responsible for the engineering analyses, contract development, and testing of rechargeable batteries and systems for utility-energy-storage applications. This report details the technical achievements realized during fiscal year 1993.

  12. Physics of Correlated Systems, Final Project Report

    SciTech Connect (OSTI)

    Greene, Chris H. [University of Colorado at Boulder] [University of Colorado at Boulder

    2014-06-25T23:59:59.000Z

    The funding of this DOE project has enabled the P.I. and his collaborators to tackle a number of problems involving nonperturbatively coupled atomic systems, including their interactions with each other and/or with an external electromagnetic field of the type provided by either a continuous-wave or a femtosecond short-pulse laser. The progress includes a new, deeper understanding of an old and famous theory of autoionization lineshapes, developed initially by Ugo Fano in 1935 and later extended in a highly cited 1961 article; the new result specifically is that in a collaboration with the Heidelberg group we have been able to demonstrate an unexpectedly simple behavior in the time domain that is relevant for modern short-pulse lasers. This study also demonstrates a way to modify and even control the lineshapes of unstable atomic and molecular energy levels.

  13. Impacts of the extended-weight coal haul road system. Final research report, December 1995

    SciTech Connect (OSTI)

    Pigman, J.; Crabtree, J.; Agent, K.; Graves, C.; Deacon, J.

    1995-12-01T23:59:59.000Z

    The Extended-Weight Coal Haul Road System, created by the Kentucky Legislature in 1986, consists of all roads which carry over 50,000 tons of coal in a calendar year. Trucks hauling coal on this system are authorized to exceed normal weight limits through the payment of an annual decal fee. A research study was initiated in July of 1992 to analyze the impacts of the extended-weight system. Analyses in this report are based on the following: historical data on coal production and transportation: data from coal decal applications; interviews of legislators, transportation officials, coal company representatives, and coal trucking representatives; newspaper articles; vehicle classification data; analyses of pavement costs; pavement rideability data; and accident data. Primary conclusions include; (1) The extended-weight system has apparently been somewhat successful in accomplishing the objective of enhancing the competitiveness and economic viability of the Kentucky coal industry; (2) Overall accident rates did not increase as a result of implementation of the extended-weight system, but the fatal accident injury rates were significantly higher on the extended-weight system and for trucks operating with the coal decal; (3) Advance-warning flashers have been evaluated and recommended as a means of reducing intersection accidents involving heavy/coal trucks; (4) The coal-decal fee structure results in a net annual loss in Road Fund revenue of approximately $2 million; (5) Forty percent of revenue from decal fees are allocated to counties even though county-maintained roads comprise only eight percent of the extended-weight system; (6) Heavier weights of coal-decal trucks add approximately $9 million annually to the pavement overlay costs; (7) Road users throughout the state are subsidizing the movement of Kentucky coal by participating in the cost of maintaining and improving the highway system; and (8) Possibly reflecting the increased funding of extended-weight roads.

  14. Public Service Companies, General Provisions (Virginia)

    Broader source: Energy.gov [DOE]

    Public Service Companies includes gas, pipeline, electric light, heat, power and water supply companies, sewer companies, telephone companies, and all persons authorized to transport passengers or...

  15. Energy Storage Systems Program Report for FY98

    SciTech Connect (OSTI)

    Butler, P.C.

    1999-04-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Energy Storage Systems Program, which is sponsored by the U.S. Department of Energy's Office of Power Technologies. The goal of this program is to collaborate with industry in developing cost-effective electric energy storage systems for many high-value stationary applications. Sandia National Laboratories is responsible for the engineering analyses, contracted development and testing of energy storage components and systems. This report details the technical achievements realized during fiscal year 1998.

  16. Utility battery storage systems program report for FY 94

    SciTech Connect (OSTI)

    Butler, P.C.

    1995-03-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Utility Battery Storage Systems Program, which is sponsored by the US Department of Energy`s Office of Energy Management. The goal of this program is to assist industry in developing cost-effective battery systems as a utility resource option by 2000. Sandia is responsible for the engineering analyses, contracted development, and testing of rechargeable batteries and systems for utility energy storage applications. This report details the technical achievements realized during fiscal year 1994.

  17. Energy Storage Systems Program Report for FY99

    SciTech Connect (OSTI)

    BOYES,JOHN D.

    2000-06-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Energy Storage Systems Program, which is sponsored by the US Department of Energy's Office of Power Technologies. The goal of this program is to develop cost-effective electric energy storage systems for many high-value stationary applications in collaboration with academia and industry. Sandia National Laboratories is responsible for the engineering analyses, contracted development, and testing of energy storage components and systems. This report details the technical achievements realized during fiscal year 1999.

  18. Energy storage systems program report for FY1996

    SciTech Connect (OSTI)

    Butler, P.C.

    1997-05-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Energy Storage Systems Program, which is sponsored by the US Department of Energy`s Office of Utility Technologies. The goal of this program is to assist industry in developing cost-effective energy storage systems as a resource option by 2000. Sandia is responsible for the engineering analyses, contracted development, and testing of energy storage systems for stationary applications. This report details the technical achievements realized during fiscal year 1996.

  19. EA-1616: National Carbon Research Center Project at Southern Company Services' Power Systems Development Facility near Wilsonville, Alabama

    Broader source: Energy.gov [DOE]

    This EA evaluates and updates the potential environmental impacts of DOE’s proposed continued operations of the NCCC Project at the PSDF plant. The NCCC is designed to test and evaluate carbon dioxide (CO2) control technologies for power generation facilities, including CO2 capture solvents and sorbents, mass-transfer devices, lower cost water-gas shift reactors, and scaled-up membrane technologies. Additionally, the NCCC evaluates methods to integrate CO2 capture technologies with other coal-based power plant systems by testing both pre-combustion and post-combustion technologies. The NCCC provides the capability to test these systems under a wide range of fuels, including bituminous and sub-bituminous coals, lignites and biomass/coal mixtures. The goal of the NCCC project is to accelerate the development, optimization, and commercialization of viable CO2 control technologies.

  20. Stability and control of singularly perturbed systems. Second annual report

    SciTech Connect (OSTI)

    Khalil, H.; El-Ansary, M.; Gajic, Z.; Litkouhi, B.; Saberi, A.

    1982-09-01T23:59:59.000Z

    This report surveys the results obtained during the second year of the three-year project entitled, Multimodel Strategies for Stochastic Models, and supported by the US Department of Energy, Electric Energy Systems Division. The report is divided into four parts. Part One presents a new method for studying stability of singularly perturbed systems using quadratic-type Lyapunov functions. The method is less conservative than the previous methods reported in the literature. Several examples are included to demonstrate that. Part Two is a continuation of our effort to study sampled-data control of singularly perturbed systems (see Part Three of the first annual report). Here we study singularly perturbed difference equations resulting from discretizing continious-time singularly perturbed systems. Part Three presents an important development in linear-quadratic Gaussian estimation and control of singularly perturbed systems. Near-optimum estimators and regulators are obtained using a special transformation to decouple slow and fast dynamics. Part Four considers a class of nonlinear singularly perturbed systems driven by wide-band noise and derives a reduced-order diffusion model that represents the behavior of the slow variables.

  1. Power plant system assessment. Final report. SP-100 Program

    SciTech Connect (OSTI)

    Anderson, R.V.; Atkins, D.F.; Bost, D.S.; Berman, B.; Clinger, D.A.; Determan, W.R.; Drucker, G.S.; Glasgow, L.E.; Hartung, J.A.; Harty, R.B.

    1983-10-31T23:59:59.000Z

    The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system.

  2. An analysis of the bank holding company

    E-Print Network [OSTI]

    Facka, David William

    1969-01-01T23:59:59.000Z

    company exercises more supervision over the investments of each affiliate bank than over any of the other affiliate bank's activities. This service improves the flow of information, thus increasing the productivity of investments . Many of the services...) the conven- ience, needs, and welfare of the communities and the area concerned; and (5) whether or not the effect of such acquisition or merger or consolidation would be to expand the size or extent of the bank holding company system involved beyond...

  3. ORNL Superconducting Technology Program for Electric Power Systems, Annual Report for FY 1999

    SciTech Connect (OSTI)

    Hawsey, R.A.; Murphy, A.W

    2000-04-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1999 Annual Program Review held July 26--28, 1999. Aspects of ORNL's work that were presented at the International Cryogenic Materials Conference and the Cryogenic Engineering Conference (July 1999) are included in this report, as well. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems.

  4. ORNL Superconducting Technology Program for Electric Power Systems: Annual Report for FY 1999

    SciTech Connect (OSTI)

    Hawsey, R.A.

    2000-06-13T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by U.S. industry for development of electric power applications of high-temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1999 Annual Program Review held July 26-28, 1999. Aspects of ORNL's work that were presented at the International Cryogenic Materials Conference and the Cryogenic Engineering Conference (July 1999) are included in this report, as well. This ORNL program is highly leveraged by the staff and other resources of U.S. industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with U.S. industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire-using systems.

  5. Study of the 1991 unaccounted-for gas volume at the Southern California Gas Company. Final report, January 1991-December 1992. Volume 5. Theft

    SciTech Connect (OSTI)

    Meshkati, S.; Groot, J.; Fiero, G.; Harris, G.; Ozenne, D.

    1993-04-01T23:59:59.000Z

    As part of a study of unaccounted-for gas (UAF) at the Southern California Gas Company (SoCalGas), volume V of the six-volume set examines losses due to theft. Residential and non-residential (commercial and industrial) theft are distinguished. Analysis involves estimating both frequencies of occurrence and the volumes associated with such occurrence. Approaches and techniques of detection and control are discussed. The problem in developing estimates is that theft is difficult to detect. The study finds that theft contributes approximately 644,529 thousand cubic feet to the 1991 UAF. Residential theft is estimated at 324,227 Mcf and non-residential theft at 320,302 Mcf.

  6. Public health assessment for St. Louis Airport, Hazelwood Interim Storage/Futura Coatings Company, St. Louis, St. Louis County, Missouri, Region 7. Cerclis No. MOD980633176. Preliminary report

    SciTech Connect (OSTI)

    Not Available

    1994-01-20T23:59:59.000Z

    The St. Louis Airport/Hazelwood Iterim Storage/Futura Coatings Company, a National Priorities List site, is in St. Louis County, Missouri. From 1946 to 1973, the site was used to store radioactive materials resulting from uranium processing. High levels of uranium, thorium, radium, and radon were detected in soil, groundwater, and air. The site is still being used to store radioactive materials. The Agency for Toxic Substances and Disease Registry considers the St. Louis Airport site to be an indeterminate public health hazard. Although there are emissions of radon and the presence of thorium in on-site air and off-site soils and the emission of radiation resulting from the presence of these materials is not currently considered a health hazard. At present conditions, the concentration of radon off-site is indistinguishable from background levels. However, in the past, these contaminants may have been present at levels of health concern.

  7. Benjamin Company | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2,AUDIT REPORT Americium/CuriumAguaBBBWind LtdFengliBenjamin Company Jump

  8. Glass melter system technologies for vitrification of high-sodium-content low-level, radioactive, liquid wastes: Phase 1, SBS demonstration with simulated low-level waste. Final test report

    SciTech Connect (OSTI)

    Holmes, M.J.; Scotto, M.V.; Shiao, S.Y. [Babcock & Wilcox, Alliance, OH (United States) Research Center

    1995-12-31T23:59:59.000Z

    The attached vendor report was prepared for Westinghouse Hanford Company by Babcock & Wilcox as documentation of the Phase I Final Test Report, Cyclone Combustion Melter Demonstration.

  9. Computerized management report system for monitoring manpower and cost

    SciTech Connect (OSTI)

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01T23:59:59.000Z

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

  10. Engineered Barrier System performance requirements systems study report. Revision 02

    SciTech Connect (OSTI)

    Balady, M.A.

    1997-01-14T23:59:59.000Z

    This study evaluates the current design concept for the Engineered Barrier System (EBS), in concert with the current understanding of the geologic setting to assess whether enhancements to the required performance of the EBS are necessary. The performance assessment calculations are performed by coupling the EBS with the geologic setting based on the models (some of which were updated for this study) and assumptions used for the 1995 Total System Performance Assessment (TSPA). The need for enhancements is determined by comparing the performance assessment results against the EBS related performance requirements. Subsystem quantitative performance requirements related to the EBS include the requirement to allow no more than 1% of the waste packages (WPs) to fail before 1,000 years after permanent closure of the repository, as well as a requirement to control the release rate of radionuclides from the EBS. The EBS performance enhancements considered included additional engineered components as well as evaluating additional performance available from existing design features but for which no performance credit is currently being taken.

  11. TITLE III EVALUATION REPORT FOR THE SUBSURFACE LIGHTING SYSTEM

    SciTech Connect (OSTI)

    L.J. Fernandez

    1998-09-09T23:59:59.000Z

    The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Subsurface Lighting System. Recommendations for resolving discrepancies between the as-constructed system, and the technical baseline requirements are included in this report. Cost and Schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guide lines. These recommendations are intended to improve and enhance the operation and maintenance of the facility.

  12. Simulated coal gas MCFC power plant system verification. Final report

    SciTech Connect (OSTI)

    NONE

    1998-07-30T23:59:59.000Z

    The objective of the main project is to identify the current developmental status of MCFC systems and address those technical issues that need to be resolved to move the technology from its current status to the demonstration stage in the shortest possible time. The specific objectives are separated into five major tasks as follows: Stack research; Power plant development; Test facilities development; Manufacturing facilities development; and Commercialization. This Final Report discusses the M-C power Corporation effort which is part of a general program for the development of commercial MCFC systems. This final report covers the entire subject of the Unocal 250-cell stack. Certain project activities have been funded by organizations other than DOE and are included in this report to provide a comprehensive overview of the work accomplished.

  13. Flight-systems-safety program. Progress report, May 1982

    SciTech Connect (OSTI)

    Bronisz, S.E. (comp.)

    1982-10-01T23:59:59.000Z

    This technical monthly report covers studies related to the use of /sup 238/PuO/sub 2/ in radioisotope power systems carried out for the Office of Space Nuclear Projects of the US Department of Energy by Los Alamos National Laboratory. Most of the studies discussed here are ongoing. Results and conclusions described may change as the work continues.

  14. Environmental Management System 2 2005 Site environmental report2-

    E-Print Network [OSTI]

    Environmental Management System 2 2005 Site environmental report2- One of Brookhaven National Laboratory's highest priorities is ensuring that its environmental performance measures up to its world of DOE, takes environmental stewardship very seriously. As part of BSA's commitment to environmentally

  15. Nuclear Materials Management and Safeguards System Reporting and Data Submission

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-02-10T23:59:59.000Z

    The manual provides clear and detailed instructions and procedures for documenting and reporting data submissions for nuclear materials transactions, inventories, and material balances to the Nuclear Materials Management and Safeguards System (NMMSS). Cancels DOE 5633.3B. Canceled by DOE M 474.1-2A.

  16. NASA ASRS (Pub. 63) Aviation Safety Reporting System

    E-Print Network [OSTI]

    User Access Terminal Service FAA Federal Aviation Administration FAR Federal Aviation Regulation FAS National Business Aviation Association NOAA National Oceanic and Atmospheric Administration NORCAL NorthernNASA ASRS (Pub. 63) #12;Aviation Safety Reporting System #12;General Aviation Weather Encounters i

  17. Ocean energy systems. Quarterly report, July-September 1982

    SciTech Connect (OSTI)

    Not Available

    1982-09-30T23:59:59.000Z

    This quarterly report summarizes work on the following tasks as of September 30, 1982: (1) OTEC pilot plant conceptual design review; (2) OTEC methanol; (3) financial and legal considerations in OTEC implementation; (4) GEOTEC resource exploration at Adak, Alaska, and Lualualei, Hawaii; (5) preliminary GEOTEC plant cost estimates; and (6) supervision of testing of pneumatic wave energy conversion system.

  18. The Business Case for Fuel Cells 2010: Why Top Companies are...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Why Top Companies are Purchasing Fuel Cells Today The Business Case for Fuel Cells 2010: Why Top Companies are Purchasing Fuel Cells Today This report was developed by Fuel...

  19. System Advisor Model: Flat Plate Photovoltaic Performance Modeling Validation Report

    SciTech Connect (OSTI)

    Freeman, J.; Whitmore, J.; Kaffine, L.; Blair, N.; Dobos, A. P.

    2013-12-01T23:59:59.000Z

    The System Advisor Model (SAM) is a free software tool that performs detailed analysis of both system performance and system financing for a variety of renewable energy technologies. This report provides detailed validation of the SAM flat plate photovoltaic performance model by comparing SAM-modeled PV system generation data to actual measured production data for nine PV systems ranging from 75 kW to greater than 25 MW in size. The results show strong agreement between SAM predictions and field data, with annualized prediction error below 3% for all fixed tilt cases and below 8% for all one axis tracked cases. The analysis concludes that snow cover and system outages are the primary sources of disagreement, and other deviations resulting from seasonal biases in the irradiation models and one axis tracking issues are discussed in detail.

  20. Hydrogen Deployment System Modeling Environment (HyDS ME) Documentation: Milestone Report FY 2006

    SciTech Connect (OSTI)

    Parks. K.

    2006-11-01T23:59:59.000Z

    This report introduces the Hydrogen Deployment System Modeling Environment model, assumptions, and basic operations.

  1. Utility battery storage systems. Program report for FY95

    SciTech Connect (OSTI)

    Butler, P.C.

    1996-03-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Utility Battery Storage Systems Program, which is sponsored by the U.S. Department of Energy`s Office of Utility Technologies. The goal of this program is to assist industry in developing cost-effective battery systems as a utility resource option by 2000. Sandia is responsible for the engineering analyses, contracted development, and testing of rechargeable batteries and systems for utility energy storage applications. This report details the technical achievements realized during fiscal year 1995.

  2. Energy storage systems program report for FY97

    SciTech Connect (OSTI)

    Butler, P.C.

    1998-08-01T23:59:59.000Z

    Sandia National Laboratories, New Mexico, conducts the Energy Storage Systems Program, which is sponsored by the US Department of Energy`s Office of Utility Technologies. The goal of this program is to collaborate with industry in developing cost-effective electric energy storage systems for many high-value stationary applications. Sandia National Laboratories is responsible for the engineering analyses, contracted development, and testing of energy storage components and systems. This report details the technical achievements realized during fiscal year 1997. 46 figs., 20 tabs.

  3. Radiological Control Technical Position, Regarding Use of Newer Dose Terms in the Occurrence Reporting and Processing System

    Broader source: Energy.gov [DOE]

    Technical Position Clarifying Dose Reporting in the Occurrence Reporting and Processing System - RCTP-09-03

  4. Design review report for the SY-101 RAPID mitigation system

    SciTech Connect (OSTI)

    SCHLOSSER, R.L.

    1999-05-24T23:59:59.000Z

    This report documents design reviews conducted of the SY-101 Respond And Pump In Days (RAPID) Mitigation System. As part of the SY-101 Surface-Level-Rise Remediation Project, the SY-101 WID Mitigation System will reduce the potential unacceptable consequences of crust growth in Tank 241-SY-101 (SY-101). Projections of the crust growth rate indicate that the waste level in the tank may reach the juncture of the primary and secondary confinement structures of the tank late in 1999. Because of this time constraint, many design activities are being conducted in parallel and design reviews were conducted for system adequacy as well as design implementation throughout the process. Design implementation, as used in this design review report, is the final component selection (e.g., which circuit breaker, valve, or thermocouple) that meets the approved design requirements, system design, and design and procurement specifications. Design implementation includes the necessary analysis, testing, verification, and qualification to demonstrate compliance with the system design and design requirements. Design implementation is outside the scope of this design review. The design activities performed prior to detailed design implementation (i.e., system mission requirements, functional design requirements, technical criteria, system conceptual design, and where design and build contracts were placed, the procurement specification) have been reviewed and are within the scope of this design review report. Detailed design implementation will be controlled, reviewed, and where appropriate, approved in accordance with Tank Waste Remediation System (TWRS) engineering procedures. Review of detailed design implementation will continue until all components necessary to perform the transfer function are installed and tested.

  5. Integrated dry NO{sub x}/SO{sub 2} emissions control system: integrated system test report

    SciTech Connect (OSTI)

    Smith, R.A.; Muzio, L.J. [Fossil Energy Research Corp., Laguna Hills, CA (United States); Hunt, T. [Public Service Co. of Colorado, Denver, CO (United States)

    1997-04-01T23:59:59.000Z

    The DOE sponsored Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System Program, is a Clean Coal Technology III demonstration, being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, a 100 MWe, down-fired utility boiler burning a low-sulfur Western coal. The project goal is to demonstrate up to 70 percent reductions in NO{sub x} and SO{sub 2} emissions through the integration of: (1) down-fired low NO{sub x} burners with overfire air; (2) Selective Non-Catalytic Reduction (SNCR) for additional NO{sub x} removal; and (3) Dry Sorbent Injection (DSI) and duct humidification for SO{sub 2} removal. This report documents the final phase of the test program, in which the overall performance of the integrated system was evaluated. Previous testing has shown that the goal of 70 percent NO{sub x} removal was easily achieved with the combination of low-NO{sub x} burners, overfire air, and urea-based SNCR. Similarly, the ability of the sodium-based DSI system to achieve 70 percent SO{sub 2} removal was also demonstrated previously. The integrated tests demonstrated the synergistic benefit of operating the SNCR and sodium-based DSI systems concurrently. With the automatic control system set to limit the NH{sub 3} emissions to less than 8 ppm, the NO{sub 2} emissions from the sodium-based DSI system were reduced by nominally 50 percent compared to operation with the DSI system alone. Comparably, the combined operation reduced NH{sub 3} emissions, as reflected by a higher urea injection rate for a fixed NH{sub 3} emission limit. With combined DSI and SNCR operation, an ammonia odor problem was encountered around the Unit 4 ash silo (this did not occur with the SNCR system operated alone at comparable NH{sub 3} slip levels). This odor problem is attributed to the sodium changing the rate at which NH{sub 3} is released from the ash when it is wetted for truck transport to the disposal site.

  6. Test report : Raytheon / KTech RK30 energy storage system.

    SciTech Connect (OSTI)

    Rose, David Martin; Schenkman, Benjamin L.; Borneo, Daniel R.

    2013-10-01T23:59:59.000Z

    The Department of Energy Office of Electricity (DOE/OE), Sandia National Laboratories (SNL) and the Base Camp Integration Lab (BCIL) partnered together to incorporate an energy storage system into a microgrid configured Forward Operating Base to reduce the fossil fuel consumption and to ultimately save lives. Energy storage vendors will be sending their systems to SNL Energy Storage Test Pad (ESTP) for functional testing and then to the BCIL for performance evaluation. The technologies that will be tested are electro-chemical energy storage systems comprising of lead acid, lithium-ion or zinc-bromide. Raytheon/KTech has developed an energy storage system that utilizes zinc-bromide flow batteries to save fuel on a military microgrid. This report contains the testing results and some limited analysis of performance of the Raytheon/KTech Zinc-Bromide Energy Storage System.

  7. Evaluating the effectiveness of wildlife accident mitigation installations with the wildlife accident reporting system (WARS) in British Columbia

    E-Print Network [OSTI]

    Sielecki, Leonard E.

    2001-01-01T23:59:59.000Z

    EFFECTIVENESS OF WILDLIFE ACCIDENT MITIGATION INSTALLATIONSWITH THE WILDLIFE ACCIDENT REPORTING SYSTEM (WARS) INadministers the Wildlife Accident Reporting System (WARS), a

  8. Dynamic Systems Analysis Report for Nuclear Fuel Recycle

    SciTech Connect (OSTI)

    Brent Dixon; Sonny Kim; David Shropshire; Steven Piet; Gretchen Matthern; Bill Halsey

    2008-12-01T23:59:59.000Z

    This report examines the time-dependent dynamics of transitioning from the current United States (U.S.) nuclear fuel cycle where used nuclear fuel is disposed in a repository to a closed fuel cycle where the used fuel is recycled and only fission products and waste are disposed. The report is intended to help inform policy developers, decision makers, and program managers of system-level options and constraints as they guide the formulation and implementation of advanced fuel cycle development and demonstration efforts and move toward deployment of nuclear fuel recycling infrastructure.

  9. Building America Systems Integration Research Annual Report: FY 2012

    SciTech Connect (OSTI)

    Gestwick, M.

    2013-05-01T23:59:59.000Z

    This document is the Building America FY2012 Annual Report, which includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.

  10. Aeroseal, LLC a JMD, Inc Company

    E-Print Network [OSTI]

    Aeroseal, LLC a JMD, Inc Company 6838 Ellicott Drive East Syracuse, NY 13057 www.aeroseal.com Seal the Savings! May 26, 2011 Brady Peeks Northwest test procedure using an Aeroseal SmartSeal system. The total leakage of the duct system to the outside

  11. Company Level Imports Archives

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40Coal Stocks at CommercialDecadeReservesYear21Company Level Imports Company Level

  12. MINED GEOLOGIC DISPOSAL SYSTEM (MGDS) MONITORING & CONTROL SYSTEMS CENTRALIZATION TECHNICAL REPORT

    SciTech Connect (OSTI)

    M.J. McGrath

    1998-03-31T23:59:59.000Z

    The objective of this report is to identify and document Mined Geologic Disposal System (MGDS) requirements for centralized command and control. Additionally, to further develop the MGDS monitoring and control functions. This monitoring and control report provides the following information: (1) Determines the applicable requirements for a monitoring and control system for repository operations and construction (excluding Performance Confirmation). (2) Makes a determination as to whether or not centralized command and control is required.

  13. Communications and control for electric power systems: Final report

    SciTech Connect (OSTI)

    Kirkham, H.

    1998-04-01T23:59:59.000Z

    This report is a summary of some of the work done on the Communications and Control project, with particular emphasis on the achievements during the years 1986--1996. During those years, the project moved away from concern with dispersed storage and generation and its impact on power system operation (the team was responsible for studies in this area, and for making a power system simulator that included DSG), and became involved in more concrete work aimed at applying high-tech solutions to problems of power system communications and control. This report covers work done at JPL on the following topics: (1) the measurement of electric and magnetic fields, both ac and dc; (2) the use of optical power to supply low-power electronics; (3) the design of a fault-tolerant communication system designed for distribution automation; and (4) a digital phase locked loop that allows the use of low-power transmitting electronics to recreate a good-quality signal at the receiver. In a report of this kind, only the results and highlights of the work are described.

  14. Operational test report -- Project W-320 cathodic protection systems

    SciTech Connect (OSTI)

    Bowman, T.J.

    1998-06-16T23:59:59.000Z

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31). WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.

  15. UBC Social Ecological Economic Development Studies (SEEDS) Student Report CIRS Auditorium Ventilation System

    E-Print Network [OSTI]

    Ventilation System: Adequacy Assessment, Energy Consumption and Comfort of the Living Space Provided Prepared of a project/report". #12;CEEN 596 FINAL PROJECT REPORT CIRS Auditorium Ventilation System: Adequacy Assessment...........................................................................................13 a) The Ventilation System

  16. ORNL Superconducting Technology Program for electric power systems: Annual report for FY 1997

    SciTech Connect (OSTI)

    Koncinski, W.S.; O`Hara, L.M. [eds.; Hawsey, R.A.; Murphy, A.W. [comps.

    1998-03-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the science and technology base needed by US industry for commercial development of electric power applications of high temperature superconductivity. The two major elements of this program are wire development and applications development. This document describes the major research and developments activities for this program together with related accomplishments. The technical progress reported was summarized from recent open literature publications, presentations, and information prepared for the FY 1997 Annual Program Review held July 21--23, 1997. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to cooperative projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer with US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high temperature superconductor wire and wire-using systems.

  17. Health-hazard evaluation report HETA 87-392-2099, Loral Systems Group, Akron, Ohio

    SciTech Connect (OSTI)

    Not Available

    1991-02-01T23:59:59.000Z

    In response to a request from the International Union, United Automobile, Aerospace and Agricultural Implement Workers of America (UAW), an evaluation was undertaken of possible health hazards at the Loral Systems Group (SIC-3728) located in Akron, Ohio. Concern was voiced about possible asbestos (1332214) exposure. The company produces wheels and brakes for civilian and military aircraft and currently employs about 1560 persons at the Akron facility. At the time of the study there were about 2300 living retirees. The precise number who had worked in one of the four areas of particular interest was unkown. Of the 166 persons found eligible for inclusion in the health hazard evaluation (15 or more years of potential asbestos exposure in at least one of the four identified programs and still residing in Ohio), 129 participated in a medical evaluation consisting of a chest x-ray, pulmonary function test, and completion of a questionnaire to detail medical and prior work histories. Abnormal pulmonary function results were noted in 39 of these individuals of whom 30 demonstrated an obstructive pattern, three a restrictive pattern, and six both an obstructive and restrictive component. Nonsmoking participants were more likely to report chronic cough, chronic phlegm, and chronic bronchitis than comparisons.

  18. 2011 Guidelines to Defra / DECC's GHG Conversion Factors for Company Reporting Produced by AEA for the Department of Energy and Climate Change (DECC)

    E-Print Network [OSTI]

    that allows the global warming potential of different GHGs to be compared. Values for CH4 and N2O are presented as CO2 equivalents (CO2e) using Global Warming Potential (GWP) factors*, consistent with reporting resulting from electricity supplied to the consumer that are counted in both Scope 2 (electricity GENERATED

  19. Safety analysis report for packaging (onsite) doorstop samplecarrier system

    SciTech Connect (OSTI)

    Obrien, J.H.

    1997-02-24T23:59:59.000Z

    The Doorstop Sample Carrier System consists of a Type B certified N-55 overpack, U.S. Department of Transportation (DOT) specification or performance-oriented 208-L (55-gal) drum (DOT 208-L drum), and Doorstop containers. The purpose of the Doorstop Sample Carrier System is to transport samples onsite for characterization. This safety analysis report for packaging (SARP) provides the analyses and evaluation necessary to demonstrate that the Doorstop Sample Carrier System meets the requirements and acceptance criteria for both Hanford Site normal transport conditions and accident condition events for a Type B package. This SARP also establishes operational, acceptance, maintenance, and quality assurance (QA) guidelines to ensure that the method of transport for the Doorstop Sample Carrier System is performed safely in accordance with WHC-CM-2-14, Hazardous Material Packaging and Shipping.

  20. Environmental Systems Research Candidates FY-01 Annual Report

    SciTech Connect (OSTI)

    Miller, David Lynn; Piet, Steven James

    2001-03-01T23:59:59.000Z

    The Environmental Systems Research Candidates (ESRC) Program ran from April 2000 through September 2001 as part of the Environmental Systems Research and Analysis (ESRA) Program at the Idaho National Engineering and Environmental Laboratory (INEEL). ESRA provides key science and technology to meet the cleanup mission of the U.S. Department of Energy Office of Environmental Management (EM), and performs research and development that will help solve current legacy problems and enhance the INEEL’s scientific and technical capability for solving longer-term challenges. This report documents the accomplishments of the ESRC Program. The ESRC Program consisted of 25 tasks subdivided within four research areas.

  1. Safety analysis report for packaging (onsite) sample pig transport system

    SciTech Connect (OSTI)

    MCCOY, J.C.

    1999-03-16T23:59:59.000Z

    This Safety Analysis Report for Packaging (SARP) provides a technical evaluation of the Sample Pig Transport System as compared to the requirements of the U.S. Department of Energy, Richland Operations Office (RL) Order 5480.1, Change 1, Chapter III. The evaluation concludes that the package is acceptable for the onsite transport of Type B, fissile excepted radioactive materials when used in accordance with this document.

  2. Hiring Company: Chevron Oronite Technology Group, a Chevron Company

    E-Print Network [OSTI]

    Southern California, University of

    additives for fuels and lubricating oils. We are a Global company and a subsidiary of Chevron Corporation

  3. Strategy Guideline: Transitioning HVAC Companies to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, A.

    2012-05-01T23:59:59.000Z

    This report describes the findings from research IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies who have made the decision to transition to whole house performance contracting (WHPC).

  4. No Company Is An Island

    E-Print Network [OSTI]

    Maddox, A.

    No company is an island. Utilities and their industrial customers are discovering that collaboration can breed opportunity while isolation can lead to ruin. Inter company relationships have changed over recent years and HL&P and its customers...

  5. Benham Companies ESCO Qualification Sheet

    Broader source: Energy.gov [DOE]

    Document outlines the energy service company (ESCO) qualifications for Leidos Engineering (part of Benham Companies) in relation to the U.S. Department of Energy's (DOE) energy savings performance contracts (ESPC).

  6. Solar thermal power systems. Annual technical progress report, FY 1979

    SciTech Connect (OSTI)

    Braun, Gerald W.

    1980-06-01T23:59:59.000Z

    The Solar Thermal Power Systems Program is the key element in the national effort to establish solar thermal conversion technologies within the major sectors of the national energy market. It provides for the development of concentrating mirror/lens heat collection and conversion technologies for both central and dispersed receiver applications to produce electricity, provide heat at its point of use in industrial processes, provide heat and electricity in combination for industrial, commercial, and residential needs, and ultimately, drive processes for production of liquid and gaseous fuels. This report is the second Annual Technical Progress Report for the Solar Thermal Power Systems Program and is structured according to the organization of the Solar Thermal Power Systems Program on September 30, 1979. Emphasis is on the technical progress of the projects rather than on activities and individual contractor efforts. Each project description indicates its place in the Solar Thermal Power Systems Program, a brief history, the significant achievements and real progress during FY 1979, also future project activities as well as anticipated significant achievements are forecast. (WHK)

  7. Practical reliability and uncertainty quantification in complex systems : final report.

    SciTech Connect (OSTI)

    Grace, Matthew D.; Ringland, James T.; Marzouk, Youssef M. (Massachusetts Institute of Technology, Cambridge, MA); Boggs, Paul T.; Zurn, Rena M.; Diegert, Kathleen V. (Sandia National Laboratories, Albuquerque, NM); Pebay, Philippe Pierre; Red-Horse, John Robert (Sandia National Laboratories, Albuquerque, NM)

    2009-09-01T23:59:59.000Z

    The purpose of this project was to investigate the use of Bayesian methods for the estimation of the reliability of complex systems. The goals were to find methods for dealing with continuous data, rather than simple pass/fail data; to avoid assumptions of specific probability distributions, especially Gaussian, or normal, distributions; to compute not only an estimate of the reliability of the system, but also a measure of the confidence in that estimate; to develop procedures to address time-dependent or aging aspects in such systems, and to use these models and results to derive optimal testing strategies. The system is assumed to be a system of systems, i.e., a system with discrete components that are themselves systems. Furthermore, the system is 'engineered' in the sense that each node is designed to do something and that we have a mathematical description of that process. In the time-dependent case, the assumption is that we have a general, nonlinear, time-dependent function describing the process. The major results of the project are described in this report. In summary, we developed a sophisticated mathematical framework based on modern probability theory and Bayesian analysis. This framework encompasses all aspects of epistemic uncertainty and easily incorporates steady-state and time-dependent systems. Based on Markov chain, Monte Carlo methods, we devised a computational strategy for general probability density estimation in the steady-state case. This enabled us to compute a distribution of the reliability from which many questions, including confidence, could be addressed. We then extended this to the time domain and implemented procedures to estimate the reliability over time, including the use of the method to predict the reliability at a future time. Finally, we used certain aspects of Bayesian decision analysis to create a novel method for determining an optimal testing strategy, e.g., we can estimate the 'best' location to take the next test to minimize the risk of making a wrong decision about the fitness of a system. We conclude this report by proposing additional fruitful areas of research.

  8. A Document Navigation System for the Paperwork An electronic filing system won't make documentation any easier unless a company

    E-Print Network [OSTI]

    Loeb, Gerald E.

    , and Geoffrey D. V. Salter Managing and locating technical documents is a serious challenge for medical device and expensive online document management systems. However, most small organizations passed the responsibility into the scavenger hunt while management fumes at the lost productivity. When the document is found, it's time

  9. The Analytical Labortory sample tracking and reporting system

    SciTech Connect (OSTI)

    Colvin, W.J.

    1996-06-01T23:59:59.000Z

    Regulatory and project requirements stipulate that samples submitted for chemical/physical analysis be owed throughout the analytical process. The Analytical Laboratory (AL) began tracking sample request information electronically using a simple dBASE{trademark} database in 1992. In mid 1993, AL chemists formed a committee to determine the software requirements for a formal sample tracking system. The requirements were outlined for a multi-user FoxPro{trademark} application which tracked sample logins, login templates, worksheets, and sample results and also provided standardized reporting capabilities. The Analytical Laboratory Sample Tracking and Reporting System became available to AL chemists and management in February, 1994. Chemists now had quick, easy access to organized and readable sample data. Up to date, on-line access to sample status information also benefitted AL management. The ability to closely monitor samples decreased sample process time. AL customers also benefitted by receiving standardized Final reports for their samples. Eventually, system performance began to deteriorate as the database grew and network traffic increased. To improve performance, ANL-W Information Services recommended upgrading the system. Upgrading to a fully relational, client/server Oracle{trademark} database accessed from a front-end application developed using Visual Basio{trademark}, one of the many Graphical User Interface (GUI) design tools available today, would improve performance times by greater than 50%. The move to Oracle would improve throughput times of transactions and employ a more efficient use of resources. Visual Basic front-and application development began in May, 1995. In October 1995, the first prototype of the Visual Basic application was made available for testing. AL users were pleased with the added ease-of-use the GUI interface provided. The production version is scheduled for release mid May, 1996.

  10. Ocean energy systems. Quarterly report, October-December 1982

    SciTech Connect (OSTI)

    Not Available

    1982-12-01T23:59:59.000Z

    Research progress is reported on developing Ocean Thermal Energy Conversion (OTEC) systems that will provide synthetic fuels (e.g., methanol), energy-intensive products such as ammonia (for fertilizers and chemicals), and aluminum. The work also includes assessment and design concepts for hybrid plants, such as geothermal-OTEC (GEOTEC) plants. Another effort that began in the spring of 1982 is a technical advisory role to DOE with respect to their management of the conceptual design activity of the two industry teams that are designing offshore OTEC pilot plants that could deliver power to Oahu, Hawaii. In addition, a program is underway in which tests of a different kind of ocean-energy device, a turbine that is air-driven as a result of wave action in a chamber, are being planned. This Quarterly Report summarizes the work on the various tasks as of 31 December 1982.

  11. Test plan for the pilot cell test of inert anodes: Report on the June 1991 meeting at the Reynolds Metals Company facility

    SciTech Connect (OSTI)

    Windisch, C.F. Jr. (Pacific Northwest Lab., Richland, WA (United States)); Alcorn, T.R.; Tabereaux, A.T. (Reynolds Metals Co., Muscle Shoals, AL (United States). Mfg. Technology Lab.)

    1991-09-01T23:59:59.000Z

    The Inert Electrodes Program at the Pacific Northwest Laboratory (PNL) is supported by the Office of Industrial Processes (OIP) of the US Department of Energy (DOE) and is aimed at improving the energy efficiency of Hall-Heroult cells through the development of inert anodes. The inert anodes currently under study are composed of a cermet material of the general composition NiO-NiFe{sub 2}O{sub 4}-Cu. The program has three primary objectives: (1) evaluate the anode material in a pilot cell facility, (2) investigate the mechanisms of the electrochemical reactions at the anodes surface, and (3) develop sensors for monitoring various anode and/or electrolyte conditions. This report discusses a test plan that has been developed for the pilot cell test of the inert anodes. 6 refs., 7 figs., 4 tabs.

  12. Solar energy grid integration systems : final report of the Florida Solar Energy Center Team.

    SciTech Connect (OSTI)

    Ropp, Michael (Northern Plains Power Technologies, Brookings, SD); Gonzalez, Sigifredo; Schaffer, Alan (Lakeland Electric Utilities, Lakeland, FL); Katz, Stanley (Satcon Technology Corporation, Boston, MA); Perkinson, Jim (Satcon Technology Corporation, Boston, MA); Bower, Ward Isaac; Prestero, Mark (Satcon Technology Corporation, Boston, MA); Casey, Leo (Satcon Technology Corporation, Boston, MA); Moaveni, Houtan (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Click, David (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Davis, Kristopher (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Reedy, Robert (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Kuszmaul, Scott S.; Sena-Henderson, Lisa; David, Carolyn; Akhil, Abbas Ali

    2012-03-01T23:59:59.000Z

    Initiated in 2008, the Solar Energy Grid Integration Systems (SEGIS) program is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the program have focused on the complete-system development of solar technologies, with the dual goal of expanding utility-scale penetration and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. The Florida Solar Energy Center (FSEC), its partners, and Sandia National Laboratories have successfully collaborated to complete the work under the third and final stage of the SEGIS initiative. The SEGIS program was a three-year, three-stage project that include conceptual design and market analysis in Stage 1, prototype development and testing in Stage 2, and moving toward commercialization in Stage 3. Under this program, the FSEC SEGIS team developed a comprehensive vision that has guided technology development that sets one methodology for merging photovoltaic (PV) and smart-grid technologies. The FSEC team's objective in the SEGIS project is to remove barriers to large-scale general integration of PV and to enhance the value proposition of photovoltaic energy by enabling PV to act as much as possible as if it were at the very least equivalent to a conventional utility power plant. It was immediately apparent that the advanced power electronics of these advanced inverters will go far beyond conventional power plants, making high penetrations of PV not just acceptable, but desirable. This report summarizes a three-year effort to develop, validate and commercialize Grid-Smart Inverters for wider photovoltaic utilization, particularly in the utility sector.

  13. Heavy vehicle propulsion system materials program: Semiannual progress report, April 1996--September 1996

    SciTech Connect (OSTI)

    Johnson, D.R.

    1997-04-01T23:59:59.000Z

    The purpose of the Heavy Vehicle Propulsion System Materials Program is the development of materials: ceramics, intermetallics, metal alloys, and metal and ceramic coatings, to support the dieselization of class 1-3 trucks to realize a 35% fuel-economy improvement over current gasoline-fueled trucks and to support commercialization of fuel-flexible LE-55 low-emissions, high-efficiency diesel engines for class 7-8 trucks. The Office of Transportation Technologies, Office of Heavy Vehicle Technologies (OTT OHVT) has an active program to develop the technology for advanced LE-55 diesel engines with 55% efficiency and low emissions levels of 2.0 g/bhp-h NO{sub x} and 0.05 g/bhp-h particulates. The goal is also for the LE-55 engine to run on natural gas with efficiency approaching that of diesel fuel. The LE-55 program is being completed in FY 1997 and, after approximately 10 years of effort, has largely met the program goals of 55% efficiency and low emissions. However, the commercialization of the LE-55 technology requires more durable materials than those that have been used to demonstrate the goals. Heavy Vehicle Propulsion System Materials will, in concert with the heavy duty diesel engine companies, develop the durable materials required to commercialize the LE-55 technologies. OTT OHVT also recognizes a significant opportunity for reduction in petroleum consumption by dieselization of pickup trucks, vans, and sport utility vehicles. Application of the diesel engine to class 1, 2, and 3 trucks is expected to yield a 35% increase in fuel economy per vehicle. The foremost barrier to diesel use in this market is emission control. Once an engine is made certifiable, subsequent challenges will be in cost; noise, vibration, and harshness (NVH); and performance. Separate abstracts have been submitted to the database for contributions to this report.

  14. Forecasting and Capturing Emission Reductions Using Industrial Energy Management and Reporting Systems 

    E-Print Network [OSTI]

    Robinson, J.

    2010-01-01T23:59:59.000Z

    The Mandatory 2010 Green House Gas (GHG) Reporting Regulations and pending climate change legislation has increased interest in Energy Management and Reporting Systems (EMRS) as a means of both reducing and reporting GHG ...

  15. Forecasting and Capturing Emission Reductions Using Industrial Energy Management and Reporting Systems

    E-Print Network [OSTI]

    Robinson, J.

    2010-01-01T23:59:59.000Z

    The Mandatory 2010 Green House Gas (GHG) Reporting Regulations and pending climate change legislation has increased interest in Energy Management and Reporting Systems (EMRS) as a means of both reducing and reporting GHG emissions. This paper...

  16. A decision-support model for managing the fuel inventory of a Panamanian generating company

    E-Print Network [OSTI]

    Perez-Franco, Roberto, 1976-

    2004-01-01T23:59:59.000Z

    Bahia Las Minas Corp (BLM) is a fuelpowered generating company in the Panamanian power system. The purpose of this thesis is to design and evaluate a decision-support model for managing the fuel inventory of this company. ...

  17. Power systems development facility. Quarterly report, January 1995--March 1995

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs.

  18. Power Systems Development Facility. Quarterly report, January--March 1996

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particular control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the Foster Wheeler portion of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDs) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter.

  19. The livestock mandatory price reporting system: Lamb industry perceptions and impact

    E-Print Network [OSTI]

    Poghosyan, Artak Vahagn

    2002-01-01T23:59:59.000Z

    The livestock mandatory price reporting system was approved by Congress in July of 1999, signed into law on October 22, 1999, and launched on April 2, 2001. In announcing the implementation of the mandatory price reporting system, the USDA claimed...

  20. Plume measurement system (plumes) calibration experiment. Final technical report

    SciTech Connect (OSTI)

    Lohrmann, A.; Huhta, C.

    1994-08-01T23:59:59.000Z

    The Measurement of Entrainment and Transport work unit under the Dredging Research Program's Technical Area 1, entitled' Analysis of Dredged Material Placed in Open Water,' developed the PLUmes MEasurement System (PLUMES) to monitor the transport of suspended sediment from dredging and dredged material disposal operations. This acoustic system can monitor nearly synoptically, both horizontally and vertically. To determine the relationship between PLUMES acoustic measurements and suspended sediment concentrations, a laboratory sediment calibration experiment was conducted. The experiment studied acoustic backscattering from particles equivalent in size to those commonly found at dredging and dredged material disposal sites. These particles were suspended in a calibration chamber built for the study. The experiment showed that backscatterance could be predicted and concentrations calculated using Rayleigh scattering theory and an acoustic calibration of PLUMES. This report describes the experiment and the results of the experiment. Data from each calibration run are presented in the Appendices.

  1. Design, Operations, and Safety Report for the MERIT Target System

    SciTech Connect (OSTI)

    Graves, Van B [ORNL; Spampinato, Philip Thomas [ORNL

    2007-09-01T23:59:59.000Z

    The Mercury Intense Target Project (MERIT) is a proof-of-principal experiment to determine the feasibility of using a free-jet of Hg as a spallation target in a Neutrino Factory or a Muon Collider facility. The 1-cm-diameter, 20-m/sec jet will be generated inside a 15-Tesla magnetic field, and high-speed optical diagnostics will be used to photograph the interaction between the Hg jet and a 24-GeV proton beam.The experiment is scheduled to be conducted at CERN in 2007. ORNL is responsible for the design, fabrication, and testing of a system to deliver the Hg jet within the confines of the 15-cm magnet bore. This report documents the functional and safety requirements of the Hg system along with descriptions of its interfaces to the other experimental equipment.

  2. Standard review plan for dry cask storage systems. Final report

    SciTech Connect (OSTI)

    NONE

    1997-01-01T23:59:59.000Z

    The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

  3. Moltox™ Chemical Air Separation System-A Progress Report

    E-Print Network [OSTI]

    Erickson, D. C.; Brown, W. R.; Dunbobbin, B. R.; Massey, R. G.

    MOLTOX~* CHEMICAL AIR SEPARATION SYSTEM - A PROGRESS REPORT Donald C. Er1ckson Energy Concepts Co. Annapo11s, Maryland W111iam R. Brown and Br1an R. Dunbobb1n A1r Products and Chem1ca1s, Inc. Allentown, Pennsy1van1a Robert G. Massey U....S. Department of Energy Wash1ngton, D.C. ABSTRACT A new low energy route to tonnage oxygen product1on, the HOLTOX~ system, 1s now commenc1ng p110t plant test1ng. The process, 1ts h1story, and potent1a1 app11cat10ns will be descr1bed, 1n add1t1on...

  4. WRAP 1, operational test report 80X non-destructive examination system

    SciTech Connect (OSTI)

    Bottenus, R.J.

    1997-04-14T23:59:59.000Z

    This Operational Test Report was performed to verify the WRAP 1 Facility 80X Non-Destructive Examination systems operate in accordance with the system designs and specifications.

  5. Environmental Systems Research and Analysis FY 2000 Annual Report

    SciTech Connect (OSTI)

    David L. Miller; Castle, Peter Myer; Steven J. Piet

    2001-01-01T23:59:59.000Z

    The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the INEEL. Strengthening the Technical capabilities of the INEEL will provide the technical base to serve effectively as the Environmental Management Laboratory for the Office of Environmental Management (EM). This is a progress report for the third year of the ESR Program (FY 2000). A report of activities is presented for the five ESR research investment areas: (1) Transport Aspects of Selective Mass Transport Agents, (2) Chemistry of Environmental Surfaces, (3) Materials Dynamics, (4) Characterization Science, and (5) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, the report describes activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas. The five research areas are subdivided into 18 research projects. FY 2000 research in these 18 projects has resulted in more than 50 technical papers that are in print, in press, in review, or in preparation. Additionally, more than 100 presentations were made at professional society meetings nationally and internationally. Work supported by this program was in part responsible for one of our researchers, Dr. Mason Harrup, receiving the Department of Energy’s “Bright Light” and “Energy at 23” awards. Significant accomplishments were achieved. Non-Destructive Assay hardware and software was deployed at the INEEL, enhancing the quality and efficiency of TRU waste characterization for shipment. The advanced tensiometer has been employed at numerous sites around the complex to determine hydrologic gradients in variably saturated vadose zones. An ion trap, secondary ion mass spectrometer (IT-SIMS) was designed and fabricated to deploy at the INEEL site to measure the chemical speciation of radionuclides and toxic metals on the surfaces of environmentally significant minerals. The FY 2001 program will have a significantly different structure and research content. This report presents the final summary of projects coming to an end in FY 2000 and is a bridge to the FY 2001 program.

  6. Gresham/Multnomah County Phase 3 Traffic Signal System Optimization September 2008 Adaptive Traffic Signal Control System Benefits Report

    E-Print Network [OSTI]

    Bertini, Robert L.

    Gresham/Multnomah County Phase 3 Traffic Signal System Optimization September 2008 Adaptive Traffic Signal Control System Benefits Report Page i TTAABBLLEE OOFF CCOONNTTEENNTTSS 1 Executive Summary......................................................................................................................15 2.3.1 System Evaluation

  7. The Wisconsin Home Energy Rating System: Final report

    SciTech Connect (OSTI)

    Ebisch, L.

    1986-09-30T23:59:59.000Z

    The Wisconsin Home Energy Rating System (HERS) has been developed by the Department of Industry, Labor, and Human Relations under contract to the Department of Administration, Division of State Energy. The contract is funded by the US Department of Energy. The contract calls for development of a home energy rating system for 1- and 2-family dwellings, or adaptation of an already existing one, for one by the State of Wisconsin. The rating system was to be developed in the form of a simple rating tool which could be distributed for testing through municipal building inspectors. At the time it was distributed, results were to be returned and analyzed for accuracy and ease of use. Computer modeling was to be used to verify accuracy. An Ad Hoc Committee of people involved in the home market, in utilities, and in state government energy conservation agencies was established to advise DILHR and DSE staff on development of the rating system. (See Appendix G for a list of the Ad Hoc Committee members). The Ad Hoc Committee had a number of concerns about how the HERS might affect the real estate market, and whether it was worth doing. Their input helped set the direction the HERS was to aim at, and their advice, from several different angles of the home market, was very helpful to staff. This report will give some background on the process of development of the HERS and the Ad Hoc Committee, and then will give details of the technical development.

  8. Regional companies eye growth

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements Recently Approved JustificationBio-Inspired PowerRegional companies eye

  9. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration

    SciTech Connect (OSTI)

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01T23:59:59.000Z

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1 well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.

  10. Company Name Company Name Address Place Zip Sector Product Website

    Open Energy Info (EERE)

    Photovoltaics Spain S L REPS Renewable Energies and Photovoltaics Spain S L REPS Spain Solar Spanish solar project developer The firm is a subsidiary of Norwegian energy company...

  11. Company Name Company Name Address Place Zip Sector Product Website

    Open Energy Info (EERE)

    significantly better heating efficiency than conventional coiled wire elements A O Smith A O Smith Wisconsin Efficiency Solar Wisconsin based based company that makes both...

  12. Power Systems Development Facility. Quarterly report, July--September 1995

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a fimction of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and hot gas cleanup units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDS) into the structural and process designs. Substantial progress in construction activities was achieved during the quarter. Delivery and construction of the process structural steel is nearing completion. Nearly all equipment are set in its place and the FW equipment and the PCDs are being set in the structure.

  13. Company Company Code Fiscal Year Submission Date

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting theCommercialization and Innovation2010 2010 EIA-28 Financial Reporting

  14. CPP-603 Chloride Removal System Decontamination and Decommissioning. Final report

    SciTech Connect (OSTI)

    Moser, C.L.

    1993-02-01T23:59:59.000Z

    The CPP-603 (annex) Chloride Removal System (CRS) Decontamination and Decommissioning (D&D) Project is described in this report. The CRS was used for removing Chloride ions and other contaminants that were suspended in the waters of the underwater fuel storage basins in the CPP-603 Fuel Receiving and Storage Facility (FRSF) from 1975 to 1981. The Environmental Checklist and related documents, facility characterization, decision analysis`, and D&D plans` were prepared in 1991. Physical D&D activities were begun in mid summer of 1992 and were completed by the end of November 1992. All process equipment and electrical equipment were removed from the annex following accepted asbestos and radiological contamination removal practices. The D&D activities were performed in a manner such that no radiological health or safety hazard to the public or to personnel at the Idaho National Engineering Laboratory (INEL) occurred.

  15. Solar hydrogen energy system. Annual report, 1995--1996

    SciTech Connect (OSTI)

    Veziroglu, T.N.

    1996-12-31T23:59:59.000Z

    The paper reports progress on three tasks. Task A, System comparison of hydrogen with other alternative fuels in terms of EPACT requirements, investigates the feasibility of several alternative fuels, namely, natural gas, methanol, ethanol, hydrogen and electricity, to replace 10% of gasoline by the year 2000. The analysis was divided into two parts: analysis of vehicle technologies and analysis of fuel production, storage and distribution. Task B, Photovoltaic hydrogen production, involves this fuel production method for the future. The process uses hybrid solar collectors to generate dc electricity, as well as high temperature steam for input to the electrolyzer. During the first year, solar to hydrogen conversion efficiencies have been considered. The third task, Hydrogen safety studies, covers two topics: a review of codes, standards, regulations, recommendations, certifications, and pamphlets which address safety of gaseous fuels; and an experimental investigation of hydrogen flame impingement.

  16. Solar/gas systems impact analysis study. Final report, September 1982-July 1984

    SciTech Connect (OSTI)

    Hahn, E.F.; Preble, B.; Neill, C.P.; Loose, J.C.; Poe, T.E.

    1984-07-01T23:59:59.000Z

    The impacts of solar/gas technologies on gas consumers and on gas utilities was measured separately and compared against the impacts of competing gas and electric systems in four climatic regions of the U.S. A methodology was developed for measuring the benefits or penalties of solar/gas systems on a combined basis for consumers and distribution companies. The authors analysis shows that the combined benefits associated with solar/gas systems are generally greatest when the systems are purchased by customers who would have otherwise chosen high-efficiency electric systems (were solar/gas systems not available in the market place). The role of gas utilities in encouraging consumer acceptance of solar/gas systems was also examined in a qualitative fashion. The authors then developed a decision framework for analyzing the type and level of utility involvement in solar/gas technologies.

  17. Kansas Certified Development Companies (Kansas)

    Broader source: Energy.gov [DOE]

    Kansas Certified Development Companies (CDC) assist businesses by developing loan packages that meet the financial need of a project. These packages often contain multiple sources of project...

  18. Regulations For Gas Companies (Tennessee)

    Broader source: Energy.gov [DOE]

    The Regulations for Gas Companies, implemented by the Tennessee Regulatory Authority (Authority) outline the standards for metering, distribution and electricity generation for utilities using gas....

  19. Minnesota Company 3M Awarded $3 Million by Energy Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of 3 million to 3M Company in St. Paul, Minnesota, to lower the cost of advanced fuel cell systems by developing cost-effective, durable, and highly efficient fuel cell...

  20. Intermountain Gas Company (IGC)- Gas Heating Rebate Program

    Broader source: Energy.gov [DOE]

    The Intermountain Gas Company's (IGC) Gas Heating Rebate Program offers customers a $200 per unit rebate when they convert to a high efficiency natural gas furnace that replaces a heating system...

  1. AEP Texas Central Company- SMART Source Solar PV Rebate Program

    Broader source: Energy.gov [DOE]

    American Electric Power Texas Central Company (AEP-TCC) offers rebates to customers that install photovoltaic (PV) systems on homes or other buildings. Customers of all rate classes are eligible to...

  2. AEP Texas North Company- SMART Source Solar PV Rebate Program

    Broader source: Energy.gov [DOE]

    American Electric Power Texas North Company (AEP-TNC) offers rebates to customers that install photovoltaic (PV) systems on homes or other buildings. Customers of all rate classes (e.g.,...

  3. On the modeling of an instance of the electric power system -TECHNICAL REPORT RCL061201 -

    E-Print Network [OSTI]

    Firenze, Universitŕ degli Studi di

    confined to single infrastructures. Electrical Power Systems (EPSs) are prominent representativesOn the modeling of an instance of the electric power system - TECHNICAL REPORT RCL061201 through which vital services are provided. Electrical Power System (EPS) are prominent representatives

  4. Better Buildings Neighborhood Program Reporting and Information System

    Broader source: Energy.gov [DOE]

    This page includes the latest guidance, resources, and links to assist partners with reporting. Information includes:

  5. Developing validation strategies for the financial-reporting system. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-02-06T23:59:59.000Z

    This report is the result of an 8-month project performed for the Office of Energy Information Validation (OEIV) in the Department of Energy. Its primary purpose has been to develop alternative techniques for validating the Financial Reporting System (FRS). In order to accomplish this objective, several activities were performed. First, the data needs of prospective FRS users were related to the information available from the FRS to determine how well the FRS data meet users' needs. The two most common desired changes in the FRS among the users were: more segmented data and more geographic detail. Two additional desired changes were: clarification or alteration in definitions of such terms as domestic, operating income, and funds (as in sources and use of statement), and require ARAMCO to submit FRS data or require the participating members to make necessary reconciliations on their income statements. Next, several key validation issues pertinent to the meaningfulness and usefulness of FRS data were examined. This task dealt directly with the problem of using accounting data for economic analyses. Finally, specific guidelines for validating the flow of data from a respondent to the FRS data base were developed. Utilizing the framework within which OEIV must operate, and based on their legislative mandate, empirical techniques were outlined in detail for the accomplishment of verification auditing, consistency/reasonableness auditing, and field auditing.

  6. Pentek metal coating removal system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek coating removal technology was tested and is being evaluated at Florida International University (FIU) as a baseline technology. In conjunction with FIU`s evaluation of efficiency and cost, this report covers evaluation conducted for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek coating removal system consisted of the ROTO-PEEN Scaler, CORNER-CUTTER{reg_sign}, and VAC-PAC{reg_sign}. They are designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M Roto Peen tungsten carbide cutters while the CORNER-CUTTER{reg_sign} uses solid needles for descaling activities. These hand tools are used with the VAC-PAC{reg_sign} vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure minimal, but noise exposure was significant. Further testing for each exposure is recommended because of the environment where the testing demonstration took place. It is feasible that the dust and noise levels will be higher in an enclosed operating environment of different construction. In addition, other areas of concern found were arm-hand vibration, whole-body, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  7. Pentek concrete scabbling system: Baseline report; Greenbook (chapter)

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek scabbling technology was tested at Florida International University (FIU) and is being evaluated as a baseline technology. This report evaluates it for safety and health issues. It is a commercially available technology and has been used for various projects at locations throughout the country. The Pentek concrete scabbling system consisted of the MOOSE, SQUIRREL-I, and SQUIRREL-III scabblers. The scabblers are designed to scarify concrete floors and slabs using cross-section, tungsten carbide tipped bits. The bits are designed to remove concrete in 318 inch increments. The bits are either 9-tooth or demolition type. The scabblers are used with a vacuum system designed to collect and filter the concrete dust and contamination that is removed from the surface. The safety and health evaluation conducted during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each of these exposures is recommended. Because of the outdoor environment where the testing demonstration took place, results may be inaccurate. It is feasible that the dust and noise levels will be higher in an enclosed operating environment. Other areas of concern were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  8. Energy Research and Development Division FINAL PROJECT REPORT

    E-Print Network [OSTI]

    Energy Research and Development Division FINAL PROJECT REPORT Integrated CHP Company, California Air Resource Board, U.S. Department of Energy, Integrated CHP Systems Corporation Integrated CHP Using UltraLow NOx Supplemental Firing is the final report for the Integrated CHP Using Ultra

  9. Aditya A. Shah Deere & Company,

    E-Print Network [OSTI]

    Aditya A. Shah Deere & Company, Dubuque, IA 52001 e-mail: shahadityaa@johndeere.com Christiaan J. J 30332 e-mail: chris.paredis@me.gatech.edu Roger Burkhart Deere & Company, Moline, IL 61265 e it to an example of a hydraulic log splitter. Based on this initial example, we discuss two advantages

  10. FY 93 Thermal Loading Systems Study Final Report

    SciTech Connect (OSTI)

    S.F. Saterlie

    1994-08-29T23:59:59.000Z

    The objective of the Mined Geologic Disposal System (MGDS) Thermal Loading Systems Study being conducted by the is to identify a thermal strategy that will meet the performance requirements for waste isolation and will be safe and licensable. Specifically, both postclosure and preclosure performance standards must be met by the thermal loading strategy ultimately selected. In addition cost and schedule constraints must be considered. The Systems Engineering approach requires structured, detailed analyses that will ultimately provide the technical basis for the development, integration, and evaluation of the overall system, not just a subelement of that system. It is also necessary that the systems study construct options from within the range that are allowed within the current legislative and programmatic framework. For example the total amount of fuel that can legally be emplaced is no more than 70,000 metric tons of uranium (MTU) which is composed of 63,000 MTU spent fuel and 7,000 MTU of defense high level waste. It is the intent of this study to begin the structured development of the basis for a thermal loading decision. However, it is recognized that to be able to make a final decision on thermal loading will require underground data on the effects of heating as well as a suite of ''validated'' models. It will be some time before these data and models are available to the program. Developing a final, thermal loading decision will, therefore, be an iterative process. In the interim, the objective of the thermal loading systems study has been to utilize the information available to assess the impact of thermal loading. Where technical justification exists, recommendations to narrow the range of thermal loading options can be made. Additionally, recommendations as to the type of testing and accuracy of the testing needed to establish the requisite information will be made. A constraint on the ability of the study to select an option stems from the lack of primary hard data, uncertainties in derived data, unsubstantiated models, and the inability to fully consider simultaneously coupled processes. As such, the study must rely on idealized models and available data to compare the thermal loading options. This report presents the findings of the FY 1993 MGDS Thermal Loading Systems Study. The objectives of the study were to: (1) if justified, place bounds on the thermal loading which would establish the loading that is ''too hot''; (2) ''grade'' or evaluate the performance as a function of thermal loading of the potential repository to contain high level spent nuclear fuel against performance criteria; (3) evaluate the performance of the various options with respect to cost, safety, and operability; and (4) recommend the additional types of tests and/or analyses to be conducted to provide the necessary information for a thermal loading selection.

  11. Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs—Summary Report

    SciTech Connect (OSTI)

    O'Neil, Lori Ross; Assante, Michael; Tobey, D. H.; Conway, T. J.; Vanderhorst, Jr, T. J.; Januszewski, III, J.; Leo, R.; Perman, K.

    2013-07-01T23:59:59.000Z

    This document is a summarization of the report, Developing Secure Power Systems Professional Competence: Alignment and Gaps in Workforce Development Programs, the final report for phase 2 of the SPSP (DOE workforce study) project.

  12. Environmental Systems Research Candidates Program--FY2000 Annual report

    SciTech Connect (OSTI)

    Piet, Steven James

    2001-01-01T23:59:59.000Z

    The Environmental Systems Research Candidates (ESRC) Program, which is scheduled to end September 2001, was established in April 2000 as part of the Environmental Systems Research and Analysis Program at the Idaho National Engineering and Environmental Laboratory (INEEL) to provide key science and technology to meet the clean-up mission of the U.S. Department of Energy Office of Environmental Management, and perform research and development that will help solve current legacy problems and enhance the INEEL’s scientific and technical capability for solving longer-term challenges. This report documents the progress and accomplishments of the ESRC Program from April through September 2000. The ESRC Program consists of 24 tasks subdivided within four research areas: A. Environmental Characterization Science and Technology. This research explores new data acquisition, processing, and interpretation methods that support cleanup and long-term stewardship decisions. B. Subsurface Understanding. This research expands understanding of the biology, chemistry, physics, hydrology, and geology needed to improve models of contamination problems in the earth’s subsurface. C. Environmental Computational Modeling. This research develops INEEL computing capability for modeling subsurface contaminants and contaminated facilities. D. Environmental Systems Science and Technology. This research explores novel processes to treat waste and decontaminate facilities. Our accomplishments during FY 2000 include the following: • We determined, through analysis of samples taken in and around the INEEL site, that mercury emissions from the INEEL calciner have not raised regional off-INEEL mercury contamination levels above normal background. • We have initially demonstrated the use of x-ray fluorescence to image uranium and heavy metal concentrations in soil samples. • We increased our understanding of the subsurface environment; applying mathematical complexity theory to the problem of transport of subsurface contaminants. • We upgraded the INEEL’s high-speed computer link to offsite supercomputers from T1 (1.5 MB/s) to DS3 (45 MB/s). Procurements have initiated a further upgrade to OC3 (155 MB/s) with additional onsite computational power that should put the INEEL on the Top 500 Supercomputing Sites list. • We developed advanced decontamination, decommissioning, and dismantlement techniques, including the Decontamination, Decommissioning, and Remediation Optimal Planning System.

  13. National Geoscience Data Repository System, Phase II. Final report, January 30, 1995--January 28, 1997

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    The American Geological Institute (AGI) has completed Phase II of a project to establish a National Geoscience Data Repository System (NGDRS). The project`s primary objectives are to preserve geoscience data in jeopardy of being destroyed and to make that data available to those who have a need to use it in future investigations. These data are available for donation to the public as a result of the downsizing that has occurred in the major petroleum and mining companies in the United States for the past decade. In recent years, these companies have consolidated domestic operations, sold many of their domestic properties and relinquished many of their leases. The scientific data associated with those properties are no longer considered to be useful assets and are consequently in danger of being lost forever. The national repository project will make many of these data available to the geoscience community for the first time. To address this opportunity, AGI sought support from the Department of Energy (DOE) in 1994 to initiate the NGDRS Phase I feasibility study to determine the types and quantity of data that companies would be willing to donate. The petroleum and mining companies surveyed indicated that they were willing to donate approximately five million well logs, one hundred million miles of seismic reflection data, millions of linear feet of core and cuttings, and a variety of other types of scientific data. Based on the positive results of the Phase I study, AGI undertook Phase II of the program in 1995. Funded jointly by DOE and industry, Phase II encompasses the establishment of standards for indexing and cataloging of geoscience data and determination of the costs of transferring data from the private sector to public-sector data repositories. Pilot projects evaluated the feasibility of the project for transfer of different data types and creation of a Web-based metadata supercatalog and browser.

  14. Status of Tampa Electric Company IGCC Project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1992-01-01T23:59:59.000Z

    Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit [number sign]1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

  15. Status of Tampa Electric Company IGCC Project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1992-10-01T23:59:59.000Z

    Tampa Electric Company will utilize Integrated Gasification Combined Cycle technology for its new Polk Power Station Unit {number_sign}1. The project is partially funded under the Department of Energy Clean Coal Technology Program Round III. This paper describes the technology to be used, process details, demonstration of a new hot gas clean-up system, and the schedule, leading to commercial operation in July 1996.

  16. SYSTEMATIC EARLY PROGRESS REPORT AND ANY-TIME, ANY-STUDENT ACADEMIC WARNING SYSTEM

    E-Print Network [OSTI]

    Gering, Jon C.

    SB #0906 SYSTEMATIC EARLY PROGRESS REPORT AND ANY-TIME, ANY-STUDENT ACADEMIC WARNING SYSTEM WHEREAS]nstitute an early warning system that allows faculty to inform academic advisors when students are not attending Warning System as described in Appendix A. 2) Truman shall implement a Systematic Early Progress Report

  17. Real-Time Deep-Ocean Tsunami Measuring, Monitoring, and Reporting System

    E-Print Network [OSTI]

    identified the requirements of the tsunami measurement system through evolution in both technologyReal-Time Deep-Ocean Tsunami Measuring, Monitoring, and Reporting System: The NOAA DART II the system components that make up the second-generation Deep-Ocean Assessment and Reporting of Tsunamis

  18. NOAA FORMS CATALOG 12-PROJECT PLANNING AND REPORTING SYSTEMS

    E-Print Network [OSTI]

    , AND SCIENTIFIC AFFAIRS 17-4 Initial Report on Weather 4-81 R/PDC EA Modification Activities 17-4A Interim Activity Reports and 4-81 R/PDC EA Final Report 17-4B Daily Log During Weather 4-81 R/PDC EA Modification

  19. Nels Sveinsson REYST report 03-2011

    E-Print Network [OSTI]

    Karlsson, Brynjar

    Reykjavík Energy Graduate School of Sustainable Systems Profitability Assessment for a Tidal Power Plant,000,000 annual visits to all of the facilities of the company Reykjavík Energy. Keywords: Tidal Power PlantNíels Sveinsson REYST report 03-2011 Profitability Assessment for a Tidal Power Plant at the Mouth

  20. Traffic congestion forecasting model for the INFORM System. Final report

    SciTech Connect (OSTI)

    Azarm, A.; Mughabghab, S.; Stock, D.

    1995-05-01T23:59:59.000Z

    This report describes a computerized traffic forecasting model, developed by Brookhaven National Laboratory (BNL) for a portion of the Long Island INFORM Traffic Corridor. The model has gone through a testing phase, and currently is able to make accurate traffic predictions up to one hour forward in time. The model will eventually take on-line traffic data from the INFORM system roadway sensors and make projections as to future traffic patterns, thus allowing operators at the New York State Department of Transportation (D.O.T.) INFORM Traffic Management Center to more optimally manage traffic. It can also form the basis of a travel information system. The BNL computer model developed for this project is called ATOP for Advanced Traffic Occupancy Prediction. The various modules of the ATOP computer code are currently written in Fortran and run on PC computers (pentium machine) faster than real time for the section of the INFORM corridor under study. The following summarizes the various routines currently contained in the ATOP code: Statistical forecasting of traffic flow and occupancy using historical data for similar days and time (long term knowledge), and the recent information from the past hour (short term knowledge). Estimation of the empirical relationships between traffic flow and occupancy using long and short term information. Mechanistic interpolation using macroscopic traffic models and based on the traffic flow and occupancy forecasted (item-1), and the empirical relationships (item-2) for the specific highway configuration at the time of simulation (construction, lane closure, etc.). Statistical routine for detection and classification of anomalies and their impact on the highway capacity which are fed back to previous items.

  1. Hanford site tank waste remediation system programmatic environmental review report

    SciTech Connect (OSTI)

    Haass, C.C.

    1998-09-03T23:59:59.000Z

    The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmental Impact Statement (EIS) Record of Decision (ROD) to perform future National Environmental Policy Act (NEPA) analysis at key points in the Program. Each review will address the potential impacts that new information may have on the environmental impacts presented in the TWRS EIS and support an assessment of whether DOE`s plans for remediating the tank waste are still pursuing the appropriate plan for remediation or whether adjustments to the program are needed. In response to this commitment, DOE prepared a Supplement Analysis (SA) to support the first of these reevaluations. Subsequent to the completion of the SA, the Phase IB negotiations process with private contractors resulted in several changes to the planned approach. These changes along with other new information regarding the TWRS Program have potential implications for Phase 1 and Phase 2 of tank waste retrieval and waste storage and/or disposal that may influence the environmental impacts of the Phased Implementation alternative. This report focuses on identifying those potential environmental impacts that may require NEPA analysis prior to authorization to begin facility construction and operations.

  2. Economic development through biomass system integration: Summary report

    SciTech Connect (OSTI)

    DeLong, M.M. [Northern States Power Co., Minneapolis, MN (United States)

    1995-10-01T23:59:59.000Z

    Alfalfa is a well-known and widely-planted crop that offers environmental and soil conservation advantages when grown as a 4-year segment in a 7-year rotation with corn and soybeans. Alfalfa fixes nitrogen from the air, thereby enhancing soil nitrogen and decreasing the need for manufactured nitrogen fertilizer. With alfalfa yields of 4 dry tons per acre per year and the alfalfa leaf fraction sold as a high-value animal feed the remaining alfalfa stem fraction can be economically viable fuel feedstock for a gasifier combined cycle power plant. This report is a feasibility study for an integrated biomass power system, where an energy crop (alfalfa) is the feedstock for a processing plant and a power power plant (integrated gasification combined cycle) in a way that benefits the facility owners. The sale of an animal feed co-product and electricity both help cover the production cost of alfalfa and the feedstock processing cost, thereby requiring neither the electricity or leaf meal to carry the total cost. The power plant provides an important continous demand for the feedstock and results in continous supply of leaf product to provide a reliable supply needed for the leaf meal product.

  3. Engineered Barrier Systems Thermal-Hydraulic-Chemical Column Test Report

    SciTech Connect (OSTI)

    W.E. Lowry

    2001-12-13T23:59:59.000Z

    The Engineered Barrier System (EBS) Thermal-Hydraulic-Chemical (THC) Column Tests provide data needed for model validation. The EBS Degradation, Flow, and Transport Process Modeling Report (PMR) will be based on supporting models for in-drift THC coupled processes, and the in-drift physical and chemical environment. These models describe the complex chemical interaction of EBS materials, including granular materials, with the thermal and hydrologic conditions that will be present in the repository emplacement drifts. Of particular interest are the coupled processes that result in mineral and salt dissolution/precipitation in the EBS environment. Test data are needed for thermal, hydrologic, and geochemical model validation and to support selection of introduced materials (CRWMS M&O 1999c). These column tests evaluated granular crushed tuff as potential invert ballast or backfill material, under accelerated thermal and hydrologic environments. The objectives of the THC column testing are to: (1) Characterize THC coupled processes that could affect performance of EBS components, particularly the magnitude of permeability reduction (increases or decreases), the nature of minerals produced, and chemical fractionation (i.e., concentrative separation of salts and minerals due to boiling-point elevation). (2) Generate data for validating THC predictive models that will support the EBS Degradation, Flow, and Transport PMR, Rev. 01.

  4. The Business Case for Fuel Cells 2011: Energizing America's Top Companies

    Fuel Cell Technologies Publication and Product Library (EERE)

    This report was developed by Fuel Cells 2000 with support from the Fuel Cell Technologies program. The report profiles nationally recognizable companies and corporations that are deploying or demonstr

  5. Columbia River Hatchery Reform System-Wide Report.

    SciTech Connect (OSTI)

    Warren, Dan [Hatchery Scientific Review Group

    2009-04-16T23:59:59.000Z

    The US Congress funded the Puget Sound and Coastal Washington Hatchery Reform Project via annual appropriations to the US Fish and Wildlife Service (USFWS) beginning in fiscal year 2000. Congress established the project because it recognized that while hatcheries have a necessary role to play in meeting harvest and conservation goals for Pacific Northwest salmonids, the hatchery system was in need of comprehensive reform. Most hatcheries were producing fish for harvest primarily to mitigate for past habitat loss (rather than for conservation of at-risk populations) and were not taking into account the effects of their programs on naturally spawning populations. With numerous species listed as threatened or endangered under the Endangered Species Act (ESA), conservation of salmon in the Puget Sound area was a high priority. Genetic resources in the region were at risk and many hatchery programs as currently operated were contributing to those risks. Central to the project was the creation of a nine-member independent scientific review panel called the Hatchery Scientific Review Group (HSRG). The HSRG was charged by Congress with reviewing all state, tribal and federal hatchery programs in Puget Sound and Coastal Washington as part of a comprehensive hatchery reform effort to: conserve indigenous salmonid genetic resources; assist with the recovery of naturally spawning salmonid populations; provide sustainable fisheries; and improve the quality and cost-effectiveness of hatchery programs. The HSRG worked closely with the state, tribal and federal managers of the hatchery system, with facilitation provided by the non-profit organization Long Live the Kings and the law firm Gordon, Thomas, Honeywell, to successfully complete reviews of over 200 hatchery programs at more than 100 hatcheries across western Washington. That phase of the project culminated in 2004 with the publication of reports containing the HSRG's principles for hatchery reform and recommendations for Puget Sound/Coastal Washington hatchery programs, followed by the development in 2005 of a suite of analytical tools to support application of the principles (all reports and tools are available at www.hatcheryreform.us). In 2005, Congress directed the National Oceanic and Atmospheric Administration-Fisheries (NOAA Fisheries) to replicate the Puget Sound and Coastal Washington Hatchery Reform Project in the Columbia River Basin. The HSRG was expanded to 14 members to include individuals with specific knowledge about the Columbia River salmon and steelhead populations. This second phase was initially envisioned as a one-year review, with emphasis on the Lower Columbia River hatchery programs. It became clear however, that the Columbia River Basin needed to be viewed as an inter-connected ecosystem in order for the review to be useful. The project scope was subsequently expanded to include the entire Basin, with funding for a second year provided by the Bonneville Power Administration (BPA) under the auspices of the Northwest Power and Conservation Council's (NPCC) Fish and Wildlife Program. The objective of the HSRG's Columbia River Basin review was to change the focus of the Columbia River hatchery system. In the past, these hatchery programs have been aimed at supplying adequate numbers of fish for harvest as mitigation primarily for hydropower development in the Basin. A new, ecosystem-based approach is founded on the idea that harvest goals are sustainable only if they are compatible with conservation goals. The challenge before the HSRG was to determine whether or not conservation and harvest goals could be met by fishery managers and, if so, how. The HSRG determined that in order to address these twin goals, both hatchery and harvest reforms are necessary. The HSRG approach represents an important change of direction in managing hatcheries in the region. It provides a clear demonstration that current hatchery programs can indeed be redirected to better meet both conservation and harvest goals. For each Columbia River Basin Environmentally Significant Unit

  6. Waste treatment and metal recovery at the Robbins Company

    SciTech Connect (OSTI)

    Clark, P.

    1990-05-01T23:59:59.000Z

    The Robbins Company, of Attleboro, Massachusetts, a medium-sized jewelry manufacturing and plating company, installed a new wastewater treatment and metal recovery system, which forms a closed-loop, completed in February, 1988. The company now generates very small quantities of hazardous wastes non-contact cooling water from the annealing furnaces, and intends to complete it`s water conservation program by installing one or more chillers on the furnaces. Since 1986, chemical usage has dropped 81.8%, hazardous waste generation 89% and water usage by 47.7%, generating an annual savings of over $71,000.

  7. Solar energy system performance evaluation: seasonal report for IBM System IA, Huntsville, Alabama

    SciTech Connect (OSTI)

    Not Available

    1980-05-01T23:59:59.000Z

    The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is reported. The Solar Energy System, Sims Prototype System 1A, was designed by IBM to provide 50 to 60% of the space heating and domestic hot water (DHW) preheating load to a 2000 square foot floor space single faily residence in the Huntsville area. The load design temperature inside the building was to be maintained at 70 degrees fahrenheit with auxiliary energy for heating supplied by an electric heat pump assisted by an electric resistance strip heater. Auxiliary energy for domestic hot water is from a conventional 20-gallon DHW storage tank. The solar energy system, uses air as the heat transport medium, has a 720 square foot Solar Energy Products Collector Array, a 22-ton rock storage located within the office building, a pump, heat exchanger, air handler, pre-heat tank, fan and associated plumbing. The system has five different modes of operation.

  8. Parabolic Trough Solar System Piping Model: Final Report, 13 May 2002 ? 31 December 2004

    SciTech Connect (OSTI)

    Kelly, B.; Kearney, D.

    2006-07-01T23:59:59.000Z

    Subcontract report by Nexant, Inc., and Kearny and Associates regarding a study of a piping model for a solar parabolic trough system.

  9. U.S. - Canada Power System Outage Task Force: Final Report on...

    Broader source: Energy.gov (indexed) [DOE]

    Connecticut and New Jersey, and the Canadian province of Ontario. U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force...

  10. Technical Report Laboratory of Cryptography and System Security (CrySyS)

    E-Print Network [OSTI]

    Bencsáth, Boldizsár

    Technical Report by Laboratory of Cryptography and System Security (CrySyS) http ................................................................................................35 10. Comparison of cmi4432.sys and jminet7.sys

  11. Company Name Company Name Address Place Zip Sector Product Website

    Open Energy Info (EERE)

    HF ReEnergy has focused its most recent efforts on the desire to create grid quality electricity from landfill waste The company also plans to focus on making existing coal plants...

  12. A variety of opportunities exist for geology graduates in the private and public sectors and in education. Petroleum companies, petroleum service companies, mining companies,

    E-Print Network [OSTI]

    and in education. Petroleum companies, petroleum service companies, mining companies, power companies, computer software companies, and entrepreneurs hire geologists for exploration, development, mining, production, hydrologist, mining geologist, oceanographer, production geologist, researcher, resource evaluator

  13. A variety of opportunities exist for geology graduates in the private and public sectors and in education. Petroleum companies, petroleum service companies, mining companies,

    E-Print Network [OSTI]

    and in education. Petroleum companies, petroleum service companies, mining companies, power companies, computer software companies, and entrepreneurs hire geologists for exploration, development, mining, production geologist, geologist, geophysicist, hydrologist, mining geologist, oceanographer, production geologist

  14. Systems analysis for the development of small resource recovery systems: system performance data. Final report

    SciTech Connect (OSTI)

    Crnkovich, P G; Helmstetter, A J

    1980-10-01T23:59:59.000Z

    The technologies that should be developed to make small-scale solid waste processing facilities attractive and viable for small municipalities with solid waste between 50 and 250 tons per day are identified. The resource recovery systems investigated were divided into three categories: thermal processng, mechanical separation, and biological processing. Thermal processing systems investigated are: excess-air incineration; starved-air incineration/gasification; and pyrolysis (indirect heating). Mechanical processing systems investigated are: coarse refuse derived fuel; materials separation; dust refuse derived fuel; densified refuse derived fuel; and fine refuse derived fuel. Mechanical processing components investigated include: receiving module; primary size reduction module; combustible separation module; refuse derived fuel preparation module; fuel densification; fuel storage module; ferrous separation; and building and facilities. Pretreatment processes and principle methods of bioconversion of MSW dealing with biological processing are investigated. (MCW)

  15. The role of the trading arm of a major marketing company

    SciTech Connect (OSTI)

    Coorsh, B.

    1995-12-31T23:59:59.000Z

    This paper discusses trading from a marketing company and within the natural gas industry. The implications for information systems are described.

  16. Acceptance test report for the 241-SY-101 Flexible Receiver Gamma Detector System

    SciTech Connect (OSTI)

    Dowell, J.L.

    1995-02-17T23:59:59.000Z

    This Acceptance Test Report is for the 241-SY-101 Flexible Receiver Gamma Detector System. This test verified that the data logger and data converter for the gamma detector system functions as intended.

  17. The Role of Marketing at Duke Power Company

    E-Print Network [OSTI]

    Paules, W. R. Jr.

    POLICY Because their use of computerized and solid-state equipment is increasing, our industrial customers are sensitive not only to the quantity of electricity -- but also the quality. Last year, Duke Power implemented a power system disturbance...THE ROLE OF MARKETING AT DUKE POWER COMPANY W. ROGER PAULES, JR., P. E. Industrial Marketing Specialist Duke Power Company Charlotte, North Carolina ABSTRACT This paper examines the changes that have taken place in Duke Power's marketing...

  18. energy company opens American branch

    E-Print Network [OSTI]

    Lin, C.-Y. Cynthia

    in clean-energy investment and delivering unique projects and innovative products and servicesenergy company opens American branch in West Sacramento Substainible energy for sustainable energy supply. Ecostream markets such things as solar roof panel installations and other long

  19. How companies can leverage crowdsourcing

    E-Print Network [OSTI]

    Cheung, Sunny

    2012-01-01T23:59:59.000Z

    Crowdsourcing is an increasingly popular phenomenon where companies solicit the help of the public in helping accomplish some of the activities commonly performed by employees or contractors. These activities can range ...

  20. The valuation of construction companies

    E-Print Network [OSTI]

    Sassine, Edmond, 1980-

    2004-01-01T23:59:59.000Z

    The main objective of this thesis is to study the valuation of construction companies in mergers and acquisitions. The thesis is divided into three main parts; Mergers and Acquisitions, Valuation, and a Case Study. Mergers ...

  1. Deere & Company Energy Management Program 

    E-Print Network [OSTI]

    Darby, D. F.

    1981-01-01T23:59:59.000Z

    An overview of the Deere & Company Energy Management Program is discussed. A review is made of seven key elements which have contributed to the success of the program. Installed projects and established programs are identified and discussed...

  2. Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reports Reports Individual Permit reports are prepared annually to facilitate public review of activities for the previous year. Contact Environmental Communication & Public...

  3. System Integration of Distributed Power for Complete Building Systems: Phase 1 Report

    SciTech Connect (OSTI)

    Kramer, R.

    2003-12-01T23:59:59.000Z

    This report describes NiSource Energy Technologies Inc.'s base year of a planned 3-year effort to advance distributed power development, deployment, and integration. Its long-term goal is to design ways to extend distributed generation into the physical design and controls of buildings. NET worked to meet this goal through advances in the implementation and control of CHP systems in end-user environments and a further understanding of electric interconnection and siting issues. Important results from the first year were a survey of the state of the art of interconnection issues associated with distributed generation, a survey of the local zoning requirements for the NiSource service territory, and the acquisition of data about the operation, reliability, interconnection, and performance of CHP systems and components of two test sites.

  4. Pennsylvania company prepares year-end review

    SciTech Connect (OSTI)

    Not Available

    1990-04-12T23:59:59.000Z

    Equitable Resources, Inc., in Pittsburgh, Pennsylvania, reports that consolidated income for calendar year 1989 was $50.9 million, or $2.43 per share, up from 1988's $47.1 million, or $2.27 per share. The difference was primarily due to a general increase in retail rates which became effective in January 1989 for distribution customers in the state. A December 1989 settlement of a pipeline subsidiary's rate increase also added to the increase. The rate increase had been in effect since 1986, but the full effect had been reserved pending the outcome of regulatory proceedings, the company stated.

  5. K. M. Passino and P. J. Antsaklis, "A System and Control Theoretic Perspective on Artificial Intelligence Planning Systems," Control Systems Technical Report #63, Dept. of Electrical and Computer Engineering,

    E-Print Network [OSTI]

    Antsaklis, Panos

    K. M. Passino and P. J. Antsaklis, "A System and Control Theoretic Perspective on Artificial on Artificial Intelligence Planning Systems," Control Systems Technical Report #63, Dept. of Electrical Perspective on Artificial Intelligence Planning Systems," Control Systems Technical Report #63, Dept

  6. HVDC-AC system interaction from AC harmonics. Volume 1. Harmonic impedance calculations. Final report

    SciTech Connect (OSTI)

    Breuer, G D; Chow, J H; Lindh, C B; Miller, N W; Numrich, F H; Price, W W; Turner, A E; Whitney, R R

    1982-09-01T23:59:59.000Z

    Improved methods are needed to characterize ac system harmonic behavior for ac filter design for HVDC systems. The purpose of this General Electric Company RP1138 research is to evaluate the present filter design practice and to investigate methods for calculating system harmonic impedances. An overview of ac filter design for HVDC systems and a survey of literature related to filter design have been performed. Two methods for calculating system harmonic impedances have been investigated. In the measurement method, an instrumentation system for measuring system voltage and current has been assembled. Different schemes of using the measurements to calculate system harmonic impedances have been studied. In the analytical method, a procedure to include various operating conditions has been proposed. Computer programs for both methods have been prepared, and the results of the measurement and analytical methods analyzed. A conclusion of the project is that the measurement and analytical methods both provided reasonable results. There are correlations between the measured and analytical results for most harmonics, although there are discrepancies between the assumptions used in the two methods. A sensitivity approach has been proposed to further correlate the results. From the results of the analysis, it is recommended that both methods should be tested further. For the measurement method, more testing should be done to cover different system operating conditions. In the analytical method, more detailed models for representing system components should be studied. In addition, alternative statistical and sensitivity approaches should be attempted.

  7. Eastern Kodak Company

    SciTech Connect (OSTI)

    Y.S. Tyan

    2009-06-30T23:59:59.000Z

    Lighting consumes more than 20% of electricity generated in the United States. Solid state lighting relies upon either inorganic or organic light-emitting diodes (OLEDs). OLED devices because of their thinness, fast response, excellent color, and efficiency could become the technology of choice for future lighting applications, provided progress is made to increase power efficiency and device lifetime and to develop cost-effective manufacturing processes. As a first step in this process, Eastman Kodak Company has demonstrated an OLED device architecture having an efficacy over 50 lm/W that exceeds the specifications of DOE Energy Star Program Requirements for Solid State Lighting. The project included work designed to optimize an OLED device, based on a stacked-OLED structure, with performance parameters of: low voltage; improved light extraction efficiency; improved internal quantum efficiency; and acceptable lifetime. The stated goal for the end of the project was delivery of an OLED device architecture, suitable for development into successful commercial products, having over 50 lum/W power efficiency and 10,000 hours lifetime at 1000 cd/m{sup 2}. During the project, Kodak developed and tested a tandem hybrid IES device made with a fluorescent blue emitter, a phosphorescent yellow emitter, and a phosphorescent red emitter in a stacked structure. The challenge was to find low voltage materials that do not absorb excessive amounts of emitted light when the extraction enhancement structure is applied. Because an extraction enhancement structure forces the emitted light to travel several times through the OLED layers before it is emitted, it exacerbates the absorption loss. A variety of ETL and HTL materials was investigated for application in the low voltage SSL device structure. Several of the materials were found to successfully yield low operating device voltages without incurring excessive absorption loss when the extraction enhancement structure was applied. An internal extraction layer comprises two essential components: a light extraction element (LEE) that does the actual extraction of emitted light and a light coupling layer (LCL) that allows the emitted light to interact with the extraction element. Modeling results show that the optical index of the LCL needs to be high, preferably higher than that of the organic layers with an n value of {approx}1.8. In addition, since the OLED structure needs to be built on top of it the LCL needs to be physically and chemically benign. As the project concluded, our focus was on the tandem hybrid device, which proved to be the more efficient architecture. Cost-efficient device fabrication will provide the next challenges with this device architecture in order to allow this architecture to be commercialized.

  8. Annual Report: Advanced Energy Systems Fuel Cells (30 September 2013)

    SciTech Connect (OSTI)

    Gerdes, Kirk; Richards, George

    2014-04-16T23:59:59.000Z

    The comprehensive research plan for Fuel Cells focused on Solid State Energy Conversion Alliance (SECA) programmatic targets and included objectives in two primary and focused areas: (1) investigation of degradation modes exhibited by the anode/electrolyte/cathode (AEC), development of computational models describing the associated degradation rates, and generation of a modeling tool predicting long term AEC degradation response; and (2) generation of novel electrode materials and microstructures and implementation of the improved electrode technology to enhance performance. In these areas, the National Energy Technology Laboratory (NETL) Regional University Alliance (RUA) team has completed and reported research that is significant to the SECA program, and SECA continued to engage all SECA core and SECA industry teams. Examination of degradation in an operational solid oxide fuel cell (SOFC) requires a logical organization of research effort into activities such as fundamental data gathering, tool development, theoretical framework construction, computational modeling, and experimental data collection and validation. Discrete research activity in each of these categories was completed throughout the year and documented in quarterly reports, and researchers established a framework to assemble component research activities into a single operational modeling tool. The modeling framework describes a scheme for categorizing the component processes affecting the temporal evolution of cell performance, and provides a taxonomical structure of known degradation processes. The framework is an organizational tool that can be populated by existing studies, new research completed in conjunction with SECA, or independently obtained. The Fuel Cell Team also leveraged multiple tools to create cell performance and degradation predictions that illustrate the combined utility of the discrete modeling activity. Researchers first generated 800 continuous hours of SOFC experimental data capturing operational degradation. The data were matched by a 3D multi-physics simulation of SOFC operational performance assuming that the entire performance loss related to coarsening of the cathode triple phase boundary (3PB). The predicted 3PB coarsening was then used to tune the mobility parameters of a phase field model describing microstructural evolution of the lanthanum strontium manganate (LSM)/ yttria stabilized zirconia (YSZ) system. Once calibrated, the phase field model predicted continuous microstructural coarsening processes occurring over the operating period, which could be extrapolated to performance periods of longer duration and also used to produce 3D graphical representations. NETL researchers also completed significant electrode engineering research complimented by 3D multi-physics simulations. In one key activity researchers generated an illustration demonstrating that control of infiltrate deposition can provide cell manufacturers with significant additional operational and engineering control over the SOFC stack. Specifically, researchers demonstrated that by engineering the deposition of electrocatalyst inside the cathode, the distribution of overpotential across the cell could be controlled to either decrease the average cell overpotential value or minimize cross-cell overpotential gradient. Results imply that manufacturers can establish improved engineering control over stack operation by implementing infiltration technology in SOFC cathodes.

  9. Lower Flathead System Fisheries Study, 1984 Annual Report.

    SciTech Connect (OSTI)

    Darling, James E.; Pajak, Paul; Wunderlich, Mary P.

    1984-12-01T23:59:59.000Z

    This study was undertaken to assess the effects of Kerr Dam operations on the fisheries of the Lower Flathead System. Supported by Bonneville Power Administration funding, and conducted by the Confederated Salish and Kootenai Tribes, the study began in December of 1982 and is scheduled for completion in December of 1987. This report covers the 1983-84 field season and includes the status of target fish species populations in the Flathead River and tributaries, and initial work in South Bay of Flathead Lake. Additionally it addresses how Kerr operations may effect the reproduction of salmonids and northern pike. Combined trout population estimates for rainbow, brown, brook, and bull trout, averaged 13 fish/km of the lower Flathead River. The number of bull trout and cutthroat trout captured was so low that estimation of their individual populations was not possible. An interim closure to trout harvest on the lower Flathead River was recommended and approved by the Tribal Council until study results can be further analyzed and management options reviewed. Population estimates for northern pike ranged from six/kilometer in poorer habitat, to one hundred three/km in the best habitat in the main Flathead River. Seven pike were radio tagged and their movements monitored. Movements of over 89 km were recorded. One fish left the Flathead River and moved down the Clark Fork to the Plains area. Fish weirs were constructed on the Jocko River and Mission Creek to assess spawning runs of trout from the main river. Thirty-two adult rainbow passed the Jocko weir and twenty-eight passed the Mission weir during the spring spawning season. Twenty adult brown trout were captured at the Jocko weir and five at Mission weir in the fall. The Jocko weir suffered minor damage due to bed load movement during high flows of spring runoff. The structure of trout populations in the lower Flathead River points to spawning and recruitment problems caused by hydroelectric operations and sedimentation. Among the consequences of the present operational regime are constant, rapid changes in river discharge during spawning and Incubation seasons of trout species present in the lower river. Hamilton and Buell (1976) reported that similar fluctuation might exceed tolerance limits of adults and inhibit spawning behavior, dewater redds, strand fry, and displace juveniles to habitats less suitable for survival. Similar problems are felt to exist on the lower river. Constant fluctuations over backwater vegetation have been linked to major problems in successful northern pike spawning and recruitment by preventing access to spawning sites, and dewatering eggs and attached fry. Phase I of the South Bay investigation was completed this year resulting in a detailed study program for the next three years. Dominant habitat types were mapped, and physical habitat and biological monitoring methods were evaluated and selected. Permanent habitat transects, water quality stations, fish sampling, gillnetting, seining, and trapping sites were established.

  10. Passivity Index for Switched System Technical Report of the ISIS Group

    E-Print Network [OSTI]

    Antsaklis, Panos

    Passivity Index for Switched System Design Technical Report of the ISIS Group at the University of Notre Dame ISIS-09-002 May, 2009 Michael J. McCourt and Panos J. Antsaklis Department of Electrical.J. McCourt and P.J. Antsaklis, "Passivity Index for Switched System Design," ISIS Technical Report

  11. Wind Turbine Generator System Duration Test Report for the Gaia-Wind 11 kW Wind Turbine

    SciTech Connect (OSTI)

    Huskey, A.; Bowen, A.; Jager, D.

    2010-09-01T23:59:59.000Z

    This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Renewable Energy Laboratory's (NRELs) National Wind Technology Center (NWTC) as a part of this project. Duration testing is one of up to five tests that may be performed on the turbines, including power performance, safety and function, noise, and power quality tests. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification. The test equipment includes a Gaia-Wind 11 kW wind turbine mounted on an 18 m monopole tower. Gaia-Wind Ltd. manufactured the turbine in Denmark, although the company is based in Scotland. The system was installed by the NWTC Site Operations group with guidance and assistance from Gaia-Wind.

  12. Enhanced Geothermal Systems (EGS) well construction technology evaluation report.

    SciTech Connect (OSTI)

    Capuano, Louis, Jr. (Thermasource Inc.); Huh, Michael; Swanson, Robert (Thermasource Inc.); Raymond, David Wayne; Finger, John Travis; Mansure, Arthur James; Polsky, Yarom; Knudsen, Steven Dell

    2008-12-01T23:59:59.000Z

    Electricity production from geothermal resources is currently based on the exploitation of hydrothermal reservoirs. Hydrothermal reservoirs possess three ingredients critical to present day commercial extraction of subsurface heat: high temperature, in-situ fluid and high permeability. Relative to the total subsurface heat resource available, hydrothermal resources are geographically and quantitatively limited. A 2006 DOE sponsored study led by MIT entitled 'The Future of Geothermal Energy' estimates the thermal resource underlying the United States at depths between 3 km and 10 km to be on the order of 14 million EJ. For comparison purposes, total U.S. energy consumption in 2005 was 100 EJ. The overwhelming majority of this resource is present in geological formations which lack either in-situ fluid, permeability or both. Economical extraction of the heat in non-hydrothermal situations is termed Enhanced or Engineered Geothermal Systems (EGS). The technologies and processes required for EGS are currently in a developmental stage. Accessing the vast thermal resource between 3 km and 10 km in particular requires a significant extension of current hydrothermal practice, where wells rarely reach 3 km in depth. This report provides an assessment of well construction technology for EGS with two primary objectives: (1) Determining the ability of existing technologies to develop EGS wells. (2) Identifying critical well construction research lines and development technologies that are likely to enhance prospects for EGS viability and improve overall economics. Towards these ends, a methodology is followed in which a case study is developed to systematically and quantitatively evaluate EGS well construction technology needs. A baseline EGS well specification is first formulated. The steps, tasks and tools involved in the construction of this prospective baseline EGS well are then explicitly defined by a geothermal drilling contractor in terms of sequence, time and cost. A task and cost based analysis of the exercise is subsequently conducted to develop a deeper understanding of the key technical and economic drivers of the well construction process. Finally, future research & development recommendations are provided and ranked based on their economic and technical significance.

  13. Blade System Design Study. Part II, final project report (GEC).

    SciTech Connect (OSTI)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01T23:59:59.000Z

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its being used in innovative prototype blades of 9-m and 30-m length, as well as other non-wind related structures.

  14. New Report Shows Trend Toward Larger Offshore Wind Systems, with...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Department today released a new report showing progress for the U.S. offshore wind energy market in 2012, including the completion of two commercial lease auctions for...

  15. B61 System FY 2012 May Monthly Report

    SciTech Connect (OSTI)

    Neff, Warren E [Los Alamos National Laboratory

    2012-06-05T23:59:59.000Z

    These viewgraphs are to be provided to NNSA to update the status of the B61 legacy work and activities. The viewgraphs cover such issues as budget, schedule, scope, and the like. They are part of the monthly reporting process.

  16. B61 System FY 2012 June Monthly Report

    SciTech Connect (OSTI)

    Wentz, Kip G. [Los Alamos National Laboratory

    2012-07-09T23:59:59.000Z

    These viewgraphs are to be provided to NNSA to update the status of the B61 legacy work and activities. The viewgraphs cover such issues as budget, schedule, scope, and the like. They are part of the monthly reporting process.

  17. Survey Report: Improving Integration of Program Management and Systems Engineering

    E-Print Network [OSTI]

    Conforto, Edivandro

    For many years, a cultural barrier has existed between practitioners of systems engineering and of program management.  Some systems engineers and program managers have developed the mindset that their work activities ar ...

  18. Efficiency of compressed-air systems. Final report

    SciTech Connect (OSTI)

    Not Available

    1983-01-01T23:59:59.000Z

    The program undertaken by this contract is intended to quantify the current state of knowledge in American industry concerning the energy efficient design and operation of industrial compressed air systems and system components. Since there is no standard reference for designers and operators of compressed air systems which provides guidelines for maximizing the energy efficiency of these systems, a major product of this contract was the preparation of a guidebook for this purpose.

  19. Innovative technology summary report: advanced worker protection system

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    The Advanced Worker Protection System (AWPS) is a liquid-air-based, self-contained breathing and cooling system with a duration of 2 hrs. AWPS employs a patented system developed by Oceaneering Space Systems (OSS), which was supported by the Department of Energy's (DOE's) Morgantown Energy Technology Center through a cost sharing research and development contract. The heart of the system is the life-support backpack that uses liquid air to provide cooling as well as breathing gas to the worker. The backpack is combined with advanced protective garments, an advanced liquid cooling garment (LCG), a respirator, and communications and support equipment.

  20. The NOx system in nuclear waste. 1997 annual progress report

    SciTech Connect (OSTI)

    Meisel, D. [Argonne National Lab., IL (US). Chemistry Div.; Camaioni, D.; Orlando, T. [Pacific Northwest National Lab., Richland, WA (US)

    1997-01-01T23:59:59.000Z

    'The authors highlight their results from the title project. The project is a coordinated effort of the three Co-PIs to assist the Safety Programs at the Hanford and other DOE Environmental Management Sites. The authors present in the report their observations and interactively discuss their implications for safety concerns. They focus on three issues: (1) Reducing radicals in the NOx system The authors show that the only reducing radical that lasts longer than a few ns in typical waste solutions, and is capable of generating hydrogen, is NO{sub 3}{sup 2-}. The authors measured the lifetime of this species across the whole pH range (3 {le} pH {le} 14) and found it to be shorter than -15 \\265s, before it dissociates to give the strongly oxidizing NO, radicals. They found that it reacts with many proton donors (H{sup +}, phosphate, borate, NH{prime}, amines) in a reaction that is not merely an acid-base equilibrium reaction but is probably a dissociative proton transfer. They estimate the redox potential from theoretical considerations and obtain an experimental verification. They conclude that it is highly unlikely, although thermodynamically possible, that this radi-cal will generate hydrogen in waste solutions. (2) Aging of organic chelators and their degradation products by NO, Methodologies to study the degradation of organic substrates (including the important waste components, formate and oxalate) to CO;, or carbonate, by NO, were developed. This radical dimerizes and disproportionates to nitrate and nitrite. Therefore, mineraliza-tion of the organic substrates competes with the disproportionation of NO,. Among the organic substrates, formate and oxalate are also mineralized but because they are of low fuel value their mineralization is not very helpful, yet it consumes NO,. (3) Interfacial processes in aqueous suspensions Yields of charge transfer from solid silica particles to water and other liquids were meas-ured. If the particles are small enough, essentially all of the charge that is originally depos-ited in the solid escapes into the liquid. This implies that the solid/liquid interface does not provide a significant barrier to the transfer of charges into the solution when the particles are very small (I 20 nm). Electrons may reach the liquid and generate hydrogen, for example. On the other hand, the same mechanism may also provide a pathway for oxidative aging of organics by holes even when the organic is dissolved in the liquid or adsorbed on the solid surface. The authors have started to study reactions of NO,. Methodology and instrumentation to measure reactions of relevant organic radicals with NO, and with its parent NO, were developed. Because of low extinction coefficients, conductivity will be the method of choice.'

  1. Long-term system dynamics simulation methods. Final report

    SciTech Connect (OSTI)

    Manke, J.W.; Pauly, W.R.; Hemmaplardh, K.

    1985-02-01T23:59:59.000Z

    The focus of long-term dynamic simulations is to analyze the effects of wide excursions of voltage, frequency and power flows for extended periods of time on the bulk power system. The emphasis on modeling the sequence of system events over an extended period of time that follows a major disturbance distinguishes long-term dynamics from transient and midterm stability analysis where the effects of inter-machine oscillations on synchronous machines is the primary focus. The assumption of a uniform system frequency during quiscent system conditions makes it possible to use a numerical stepsize of one or more seconds for long-term studies, as opposed to a fraction of a cycle for transient/midterm stability, and to simulate the voltage and frequency effects of such system events as automatic load shedding and unit tripping for long periods of time. Both the time frame and the type of system events of interest in long-term dynamic studies establish the modeling and simulation requirements for a long-term program and the need for system data to validate the models and program. The sequence of system events that occur during the long-term time frame may introduce step changes in the system, i.e., load shedding, which cause transients that must be modeled on the transient stability time scale. This is the basis for the requirements that a long-term program have an adequate interface with a transient stability program.

  2. Commercial thermal distribution systems, Final report for CIEE/CEC

    E-Print Network [OSTI]

    Xu, T.

    2011-01-01T23:59:59.000Z

    another Building? Cooling Capacity SUPPLY-AIR SYSTEM CoolingMODE. During cooling operation, the supply temperature swingafter the cooling coil), the supply air temperature rise may

  3. INTERIM VALIDATION REPORT MIDDLE DISTILLATE PRICE MONITORING SYSTEM

    E-Print Network [OSTI]

    Hopelain, D.G.

    2011-01-01T23:59:59.000Z

    flow directly from the refinery to wholesaler, to retailer,of No. 2 heating oil for the refinery, wholesale and retailfirst system monitored refinery, wholesale and retail price

  4. Product Search Company Search

    E-Print Network [OSTI]

    Abolmaesumi, Purang

    visual connections and a pleasant, bright facility. (All photos: William McElligott) The "Wow Factor systems, as well as a reduction in the shaft/duct sizes. In addition, energy was conserved by operating/min. This long-term energy and fiscally sound approach to fume hoods was not attained at the expense

  5. NARSTO Quality Systems Science Center 2004-2005 Annual Report

    E-Print Network [OSTI]

    Laboratory (ORNL). ORNL is managed by UT-Battelle, LLC, for the U.S. Department of Energy under contract DE Project Records DM-19 Day-to-Day Operation of Data Management Systems DM-18 > Data Systems Management-12, 2005 ORNL research was sponsored by the U.S. Department of Energy and performed at Oak Ridge National

  6. Software Fault Reporting Processes in Business-Critical Systems

    E-Print Network [OSTI]

    Langseth, Helge

    and product quality. Some specific software methods will be adopted from safety-critical software engineering of Computer and Information Science Faculty of Information Technology, Mathematics and Electrical Engineering and software systems. To increase e.g. the reliability and performance of such systems we rely on a plethora

  7. Operability test report for K east basin canister cleaning system

    SciTech Connect (OSTI)

    Crystal, J.B.

    1997-01-09T23:59:59.000Z

    This document summarizes test data computed during the operability test procedure for the K East Basin Canister Cleaning System. Test Results show that the canister cleaning system successfully lowered the dose of each canister tested so that each canister could be disposed of as low level waste.

  8. Save Energy Now (SEN) Assessment Helps Expand Energy Management Program at Shaw Industries: Flooring Company Saves $872,000 Annually by Improving Steam System Efficiency

    SciTech Connect (OSTI)

    Not Available

    2008-07-01T23:59:59.000Z

    This case study describes how the Shaw Industries plant #20 in Dalton, Georgia, achieved annual savings of $872,000 and 93,000 MMBtu after receiving a DOE Save Energy Now energy assessment and implementing recommendations to improve the efficiency of its steam system.

  9. Colloquium and Report on Systems Microbiology: Beyond Microbial Genomics

    SciTech Connect (OSTI)

    Merry R. Buckley

    2004-12-13T23:59:59.000Z

    The American Academy of Microbiology convened a colloquium June 4-6, 2004 to confer about the scientific promise of systems microbiology. Participants discussed the power of applying a systems approach to the study of biology and to microbiology in particular, specifics about current research efforts, technical bottlenecks, requirements for data acquisition and maintenance, educational needs, and communication issues surrounding the field. A number of recommendations were made for removing barriers to progress in systems microbiology and for improving opportunities in education and collaboration. Systems biology, as a concept, is not new, but the recent explosion of genomic sequences and related data has revived interest in the field. Systems microbiology, a subset of systems biology, represents a different approach to investigating biological systems. It attempts to examine the emergent properties of microorganisms that arise from the interplay of genes, proteins, other macromolecules, small molecules, organelles, and the environment. It is these interactions, often nonlinear, that lead to the emergent properties of biological systems that are generally not tractable by traditional approaches. As a complement to the long-standing trend toward reductionism, systems microbiology seeks to treat the organism or community as a whole, integrating fundamental biological knowledge with genomics, metabolomics, and other data to create an integrated picture of how a microbial cell or community operates. Systems microbiology promises not only to shed light on the activities of microbes, but will also provide biology the tools and approaches necessary for achieving a better understanding of life and ecosystems. Microorganisms are ideal candidates for systems biology research because they are relatively easy to manipulate and because they play critical roles in health, environment, agriculture, and energy production. Potential applications of systems microbiology research range from improvements in the management of bacterial infections to the development of commercial-scale microbial hydrogen generation. A number of technical challenges must be met to realize the potential of systems microbiology. Development of a new, comprehensive systems microbiology database that would be available to the entire research community was identified as the single most critical need. Other challenges include difficulties in measuring single-cell parameters, limitations in identifying and measuring metabolites and other products, the inability to cultivate diverse microbes, limits on data accessibility, computational limitations associated with data integration, the lack of sufficient functional gene annotations, needs for quantitative proteomics, and the inapplicability of current high throughput methods to all areas of systems microbiology. Difficulties have also been encountered in acquiring the necessary data, assuring the quality of that data, and in making data available to the community in a useful format. Problems with data quality assurance and data availability could be partially offset by launching a dedicated systems microbiology database. To be of greatest value to the field, a database should include systems data from all levels of analysis, including sequences, microarray data, proteomics data, metabolite measurements, data on protein-protein or protein-nucleic interactions, carbohydrate and small RNA profiles, information on cell surface markers, and appropriate supporting data. Regular updates of these databases and adherence to agreed upon data format standards are critical to the success of these resources. It was recommended that educational requirements for undergraduate and graduate students in microbiology be amended to better prepare the next generation of researchers for the quantitative requirements of applying systems microbiology methods in their work. Systems microbiology research is too complex to be the sole property of any single academic discipline. The contributions of microbiologists, computer scientists, control th

  10. Company Profile Mobileye is the leading provider of automated driver assistance technologies to the automotive industry.

    E-Print Network [OSTI]

    Adler, Joan

    to the automotive industry. Founded in 1999, the company has established itself as the leader in vision systems for intelligent transportation systems (ITS), and has gained recognition from the leading automotive companies computers and at a fraction of the cost. EyeQ meets automotive cabin grade qualification requirements

  11. Environmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    System (ISMS) integrates environment, safety, and health management into all work planning and execution.4, Safety Management System Policy, are: § DEFINE THE SCOPE OF WORK: Missions are translated into workEnvironmental Management System 2 2013 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  12. Progress on Earthquake Rapid Reporting and Early Warning Systems Yih-Min Wu1

    E-Print Network [OSTI]

    Wu, Yih-Min

    Progress on Earthquake Rapid Reporting and Early Warning Systems in Taiwan Yih-Min Wu1 , Ta (RRS) and earthquake early warning (EWS) systems developed at the Central Weather Bureau (CWB), using a significant step towards a more realistic earthquake early warning capability. This early warning system has

  13. Chapter 9: Control Systems 9-1 NSLS-II Conceptual Design Report

    E-Print Network [OSTI]

    Ohta, Shigemi

    and Scope The control system for NSLS-II is designed to convey all monitor, control, model and provide data for all control aspects. It must support 1 Hz model-based control, 110 kHz power supplyChapter 9: Control Systems 9-1 NSLS-II Conceptual Design Report 9 CONTROL SYSTEM 9.1 Introduction

  14. Ris-R-Report Energy Systems Analysis of Waste to Energy

    E-Print Network [OSTI]

    Risř-R-Report Energy Systems Analysis of Waste to Energy Technologies by use of EnergyPLAN Marie Münster Risř-R-1667(EN) April 2009 #12;Author: Marie Münster Title: Energy Systems Analysis of Waste to Energy Technologies by use of EnergyPLAN Division: Systems Analysis Division Risř-R-1667(EN) April 2009

  15. STI: Flexible Wireless Systems for Rapid Network Evolution--Final Report

    E-Print Network [OSTI]

    Kansas, University of

    of Commerce, and the Federal Communications Commission (FCC). NTIA allocates spectrum to government Evolution Final Report 1 Introduction Ultra-wideband (UWB) systems portend to offer multiple communications-ranged communications system can be achieved. However, traditional UWB systems have only two degrees of freedom, pulse

  16. Integrated Nuclear-Renewable Energy Systems: Foundational Workshop Report

    SciTech Connect (OSTI)

    Shannon Bragg-Sitton; Richard Boardman; John Collins; Mark Ruth; Owen Zinaman; Charles Forsberg

    2014-08-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) recognizes the need to transform the energy infrastructure of the U.S. and elsewhere to systems that can drastically reduce environmental impacts in an efficient and economically viable manner while utilizing both hydrocarbon resources and clean energy generation sources. Thus, DOE is supporting research and development that could lead to more efficient utilization of clean energy generation sources, including renewable and nuclear options. A concept being advanced by the DOE Offices of Nuclear Energy (NE) and Energy Efficiency and Renewable Energy (EERE) is tighter coupling of nuclear and renewable energy sources in a manner that produces new energy currency for the combined electricity grid, industrial manufacturing, and the transportation energy sectors. This integration concept has been referred to as a “hybrid system” that is capable of providing the right type of energy, at the right time, in the right place. At the direction of DOE-NE and DOE-EERE leadership, project leads at Idaho National Laboratory (INL), National Renewable Energy Laboratory (NREL) and Massachusetts Institute of Technology (MIT) have identified and engaged stakeholders in discussing integrated energy systems that would optimize renewable and nuclear energy integration on a region-by-region basis. Subsequent work will entail conduct of technical, economic, environmental and socio-political evaluations of the leading integrated system options based on a set of criteria established with stakeholder input. The Foundational Workshop for Integrated Nuclear – Renewable Energy Systems was organized around the following objectives: 1. Identify and refine priority region-specific opportunities for integrated nuclear-renewable energy systems in the U.S.; 2. Select Figures of Merit (FOM) to rank and prioritize candidate systems; 3. Discuss enabling technology development needs; 4. Identify analysis requirements, capabilities and gaps to estimate FOM for integrated system options; 5. Identify experimental needs to develop and demonstrate nuclear-renewable energy systems.

  17. Intergovernmental Advanced Stationary PEM Fuel Cell System Demonstration Final Report

    SciTech Connect (OSTI)

    Rich Chartrand

    2011-08-31T23:59:59.000Z

    A program to complete the design, construction and demonstration of a PEMFC system fuelled by Ethanol, LPG or NG for telecom applications was initiated in October 2007. Early in the program the economics for Ethanol were shown to be unfeasible and permission was given by DOE to focus on LPG only. The design and construction of a prototype unit was completed in Jun 2009 using commercially available PEM FC stack from Ballard Power Systems. During the course of testing, the high pressure drop of the stack was shown to be problematic in terms of control and stability of the reformer. Also, due to the power requirements for air compression the overall efficiency of the system was shown to be lower than a similar system using internally developed low pressure drop FC stack. In Q3 2009, the decision was made to change to the Plug power stack and a second prototype was built and tested. Overall net efficiency was shown to be 31.5% at 3 kW output. Total output of the system is 6 kW. Using the new stack hardware, material cost reduction of 63% was achieved over the previous Alpha design. During a November 2009 review meeting Plug Power proposed and was granted permission, to demonstrate the new, commercial version of Plug Power's telecom system at CERL. As this product was also being tested as part of a DOE Topic 7A program, this part of the program was transferred to the Topic 7A program. In Q32008, the scope of work of this program was expanded to include a National Grid demonstration project of a micro-CHP system using hightemperature PEM technology. The Gensys Blue system was cleared for unattended operation, grid connection, and power generation in Aug 2009 at Union College in NY state. The system continues to operate providing power and heat to Beuth House. The system is being continually evaluated and improvements to hardware and controls will be implemented as more is learned about the system's operation. The program is instrumental in improving the efficiency and reducing costs of PEMFC based power systems using LPG fuel and continues to makes steps towards meeting DOE's targets. Plug Power would like to thank DOE for their support of this program.

  18. Power Systems Development Facility. First quarterly report, 1997

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    The objective of this project, herein referred to as the Power Systems Development Facility (PSDF), is to evaluate hot gas particle control technologies using coal derived gas streams. This project entails the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device (PCD) issues to be addressed include the integration of the PCDs into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  19. Autonomous intelligent assembly systems LDRD 105746 final report.

    SciTech Connect (OSTI)

    Anderson, Robert J.

    2013-04-01T23:59:59.000Z

    This report documents a three-year to develop technology that enables mobile robots to perform autonomous assembly tasks in unstructured outdoor environments. This is a multi-tier problem that requires an integration of a large number of different software technologies including: command and control, estimation and localization, distributed communications, object recognition, pose estimation, real-time scanning, and scene interpretation. Although ultimately unsuccessful in achieving a target brick stacking task autonomously, numerous important component technologies were nevertheless developed. Such technologies include: a patent-pending polygon snake algorithm for robust feature tracking, a color grid algorithm for uniquely identification and calibration, a command and control framework for abstracting robot commands, a scanning capability that utilizes a compact robot portable scanner, and more. This report describes this project and these developed technologies.

  20. The feasibility assessment of a U.S. natural gas production reporting system uniform production reporting model. Final report, July 1993--June 1994

    SciTech Connect (OSTI)

    NONE

    1994-06-01T23:59:59.000Z

    The Uniform Production Reporting Model (UPRM) project was charged with identifying the best practices and procedures of the natural gas producing states related to the gathering, management, and dissemination of production data. It is recommended that the producing states begin the process of upgrading state systems using the concepts embodied in the UPRM model.

  1. Demand Control Utilizing Energy Management Systems - Report of Field Tests

    E-Print Network [OSTI]

    Russell, B. D.; Heller, R. P.; Perry, L. W.

    1984-01-01T23:59:59.000Z

    Energy Management systems and particularly demand controllers are becoming more popular as commercial and light industrial operations attempt to reduce their electrical usage and demand. Numerous techniques are used to control energy use and demand...

  2. Harrison Radiator Division's Energy Management, Reporting and Accounting System 

    E-Print Network [OSTI]

    Goubeaux, R. J.

    1986-01-01T23:59:59.000Z

    Energy management is essential for obtaining the lowest possible product manufacturing cost. Many systems have been created over the years to manage the energy used in manufacturing. However, for a variety of reasons, most of them never reached...

  3. Why System Safety Professionals Should Read Accident Reports

    E-Print Network [OSTI]

    Holloway, C.M.; Johnson, C.W.

    Holloway,C.M. Johnson,C.W. T. Kelly (ed.), The First IET International Conference on System Safety, Institute of Engineering and Technology, Savoy Place, London, 6-8th June 2006 IEE

  4. [Reaction dynamics of high-temperature systems]. Final report

    SciTech Connect (OSTI)

    Graff, M.M.

    1992-03-08T23:59:59.000Z

    Objective was to study reactions at superthermal collision energies using a fast neutral beam produced by photodetachment. Systems under initial study included basic oxygen-hydrogen reactions. Although progress was made on each stage of the experiment, conflicting requirements (maximizing photodetachment efficiency and maximizing transmission through reaction zone) precluded ultimate success. Parameters described refer to the model system O+H{sub 2}{r_arrow}OH+H. 2 figs.

  5. Ris Energy Report 4 Supply technologies in the future energy system 10 Supply technologies in the future energy system

    E-Print Network [OSTI]

    Solar heaters Exist Y S Y Y L H Geothermal Exist Y M N N C L Wave energy 2015 Y M N Y C L Fuel cellsRisø Energy Report 4 Supply technologies in the future energy system 10 Supply technologies in the future energy system JøRGEN FENHANN, ALLAN SCHRøDER PEDERSEN, ERIK STEEN JENSEN, RISø NATIONAL LAb

  6. E791 DATA ACQUISITION SYSTEM Error reports received ; no new errors reported

    E-Print Network [OSTI]

    Fermi National Accelerator Laboratory

    of events written to tape. 18 #12; Error and Status Displays Mailbox For Histogram Requests Vax­online Event Display VAX 11 / 780 Event Reconstruction Event Display Detector Monitoring 3 VAX Workstations 42 EXABYTE of the entire E791 DA system. The VAX 11/780 was the user interface to the VME part of the system, via the DA

  7. Changes to Geothermal Reporting Code and Guidelines on Company Reporting |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, click here.Telluric Survey asWest,CEI JumpChandradeep Solar Pvt Ltd JumpOpen

  8. Direct-hydrogen-fueled proton-exchange-membrane (PEM) fuel cell system for transportation applications. Quarterly technical progress report No. 4, April 1, 1995--June 30, 1995

    SciTech Connect (OSTI)

    Oei, D.

    1995-08-03T23:59:59.000Z

    This is the fourth Technical Progress Report for DOE Contract No. DE-AC02-94CE50389 awarded to Ford Motor Company on July 1, 1994. The overall objective of this contract is to advance the Proton-Exchange-Membrane (PEM) fuel cell technology for automotive applications. Specifically, the objectives resulting from this contract are to: (1) Develop and demonstrate on a laboratory propulsion system within 2-1/2 years a fully functional PEM Fuel Cell Power System (including fuel cell peripherals, peak power augmentation and controls). This propulsion system will achieve, or will be shown to have the growth potential to achieve, the weights, volumes, and production costs which are competitive with those same attributes of equivalently performing internal combustion engine propulsion systems; (2) Select and demonstrate a baseline onboard hydrogen storage method with acceptable weight, volume, cost, and safety features and analyze future alternatives; and (3) Analyze the hydrogen infrastructure components to ensure that hydrogen can be safely supplied to vehicles at geographically widespread convenient sites and at prices which are less than current gasoline prices per vehicle-mile; (4) Identify any future R&D needs for a fully integrated vehicle and for achieving the system cost and performance goals.

  9. Final Report for the Virtual Reliability Realization System LDRD

    SciTech Connect (OSTI)

    DELLIN, THEODORE A.; HENDERSON, CHRISTOPHER L.; O'TOOLE, EDWARD J.

    2000-12-01T23:59:59.000Z

    Current approaches to reliability are not adequate to keep pace with the need for faster, better and cheaper products and systems. This is especially true in high consequence of failure applications. The original proposal for the LDRD was to look at this challenge and see if there was a new paradigm that could make reliability predictions, along with a quantitative estimate of the risk in that prediction, in a way that was faster, better and cheaper. Such an approach would be based on the underlying science models that are the backbone of reliability predictions. The new paradigm would be implemented in two software tools: the Virtual Reliability Realization System (VRRS) and the Reliability Expert System (REX). The three-year LDRD was funded at a reduced level for the first year ($120K vs. $250K) and not renewed. Because of the reduced funding, we concentrated on the initial development of the expertise system. We developed an interactive semiconductor calculation tool needed for reliability analyses. We also were able to generate a basic functional system using Microsoft Siteserver Commerce Edition and Microsoft Sequel Server. The base system has the capability to store Office documents from multiple authors, and has the ability to track and charge for usage. The full outline of the knowledge model has been incorporated as well as examples of various types of content.

  10. Smart Infrared Inspection System Field Operational Test Final Report

    SciTech Connect (OSTI)

    Siekmann, Adam [ORNL; Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL

    2011-06-01T23:59:59.000Z

    The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

  11. Development of an AC Module System: Final Technical Report

    SciTech Connect (OSTI)

    Suparna Kadam; Miles Russell

    2012-06-15T23:59:59.000Z

    The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more favorable as the product matures and is made in high volumes. GreenRay's early customers have been highly enthusiastic about the AC Module system benefits.

  12. Oil and Gas Company Oil and Gas Company Address Place Zip Website

    Open Energy Info (EERE)

    Dhahran Saudi Arabia http www saudiaramco com en home html Saudi Aramco Mobile Refinery Company SAMREF Saudi Aramco Mobile Refinery Company SAMREF P O Box Yanbu S audi...

  13. Automated Energy Distribution and Reliability System: Validation Integration - Results of Future Architecture Implementation

    SciTech Connect (OSTI)

    Buche, D. L.

    2008-06-01T23:59:59.000Z

    This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects. This report is second in a series of reports detailing this effort.

  14. Reed-Joseph International Company

    E-Print Network [OSTI]

    is offering field downloadable GPS/VHF logging collars and Solar Powered GPS/VHF backpack loggers for birds of battery powered and solar powered PTTs in a wide range of sizes, exclusively for birds. We will startReed-Joseph International Company 55 YEARS OF EXCELLENCE IN BIRD AND WILDLIFE CONTROL THE U

  15. IBM Software Lincoln Trust Company

    E-Print Network [OSTI]

    into account several "lessons learned" from the company's past pre-divestiture past. A process improve- ment team had existed several years prior, but was decommissioned due to lack of meaningful automation, there were also lessons from the past that needed to be integrated into the new program. Prior attempts

  16. Energy Management at Deere & Company 

    E-Print Network [OSTI]

    Boyd, M. P.

    1979-01-01T23:59:59.000Z

    Deere & Company appreciates the opportunity to discuss energy management and conservation with you. Energy is a topic that will occupy our thoughts for many years to come and certainly will be in the forefront in the near future. It is a subject...

  17. Confinement Vessel Assay System: Calibration and Certification Report

    SciTech Connect (OSTI)

    Frame, Katherine C. [Los Alamos National Laboratory; Bourne, Mark M. [Los Alamos National Laboratory; Crooks, William J. [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Gomez, Cipriano [Retired CMR-OPS: OPERATIONS; Mayo, Douglas R. [Los Alamos National Laboratory; Miko, David K. [Los Alamos National Laboratory; Salazar, William R. [Los Alamos National Laboratory; Stange, Sy [Los Alamos National Laboratory; Vigil, Georgiana M. [Los Alamos National Laboratory

    2012-07-17T23:59:59.000Z

    Los Alamos National Laboratory has a number of spherical confinement vessels (CVs) remaining from tests involving nuclear materials. These vessels have an inner diameter of 6 feet with 1 to 2 inch thick steel walls. The goal of the Confinement Vessel Disposition (CVD) project is to remove debris and reduce contamination inside the vessels. The Confinement Vessel Assay System (CVAS) was developed to measure the amount of SNM in CVs before and after cleanout. Prior to cleanout, the system will be used to perform a verification measurement of each vessel. After cleanout, the system will be used to perform safeguards-quality assays of {le} 100-g {sup 239}Pu equivalent in a vessel for safeguards termination. The system was calibrated in three different mass regions (low, medium, and high) to cover the entire plutonium mass range that will be assayed. The low mass calibration and medium mass calibration were verified for material positioned in the center of an empty vessel. The systematic uncertainty due to position bias was estimated using an MCNPX model to simulate the response of the system to material localized at various points along the inner surface of the vessel. The background component due to cosmic ray spallation was determined by performing measurements of an empty vessel and comparing to measurements in the same location with no vessel present. The CVAS has been tested and calibrated in preparation for verification and safeguards measurements of CVs before and after cleanout.

  18. Advanced turbine systems program conceptual design and product development. Quarterly report, February 1995--April 1995

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    Research continued on the design of advanced turbine systems. This report describes the design and test of critical components such as blades, materials, cooling, combustion, and optical diagnostics probes.

  19. Advanced turbine systems program--conceptual design and product development. Quarterly report, November 1994--January 1995

    SciTech Connect (OSTI)

    NONE

    1995-02-01T23:59:59.000Z

    Research continued in the design and development of advanced gas turbine systems. This report presents progress towards turbine blade development, diffuser development, combustion noise investigations,catalytic combustion development, and diagnostic probe development.

  20. High-end-Computer System Performance: Science and Engineering - Final Report

    SciTech Connect (OSTI)

    Hollingsworth, Jeffrey K.

    2012-01-27T23:59:59.000Z

    This report summarizes the research conducted as part of the UMD effort of the multi-site PERC project. This project developed and enhanced the Dyninst instrumentation system and the Active Harmony auto-tuning framework.

  1. Report of Survey of the Los Alamos Tritium Systems Test Assembly Facility

    Broader source: Energy.gov [DOE]

    The purpose of this document is to report the results of a survey conducted at the Los Alamos Tritium Systems Test Assembly (TSTA Facility). The survey was conducted during the week of 3/20/00.

  2. Intern experience at Honeywell, Inc., Large Information Systems Division: an internship report

    E-Print Network [OSTI]

    Ismail, Abdel-Wahab Tarek, 1956-

    2013-03-13T23:59:59.000Z

    This report describes the author's internship assignment at Honeywell Inc. - Large Information Systems Division from January, 1982 through August, 1982. The purpose of the assignment was to fulfill the internship requirements...

  3. 2009 Smart Grid System Report (July 2009) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of BadTHE U.S. DEPARTMENTTechnologies09 SPR Report to Congress 2009

  4. Decontamination systems information and research program. Quarterly report, January--March 1995

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    The projects reported during this period are categorized into the following three areas: 1.0 Site Remediation Technologies, 2.0 Advanced Product Applications Testing, and 3.0 Information Systems, Public Policy, Community Outreach, and Economics. Summaries of the significant accomplishments for the projects reported during this period, are presented.

  5. Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests, Final Report

    E-Print Network [OSTI]

    Reddy, T. A.; Elleson, J.; Haberl, J. S.

    2000-01-01T23:59:59.000Z

    This is the final report for ASHRAE Research Project 1004-RP: Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests. This report presents the results of the development and application of the methodology to Case Study #2...

  6. Decontamination systems information and research program. Quarterly report, July--September 1995

    SciTech Connect (OSTI)

    NONE

    1995-10-01T23:59:59.000Z

    The projects reported for the WVU Cooperative Agreement are categorized into the following three areas: (1) in situ remediation process development; (2) advanced product applications testing; and (3) information systems, public policy, community outreach, and economics. Summaries of the significant accomplishments for the projects reported during the period 1 July 1995 through 30 September 1995 are presented.

  7. CHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    , evaluates what impact, if any, current operations have on environmental media. Progress is reportedCHAPTER 2: ENVIRONMENTAL MANAGEMENT SYSTEM 1998 SITE ENVIRONMENTAL REPORT2-1 2 Environmental its environmental program. To further these ends, the Laboratory is developing and implementing

  8. Ris Energy Report 8 The intelligent energy system infrastructure for the future

    E-Print Network [OSTI]

    Risø Energy Report 8 The intelligent energy system infrastructure for the future Reprint Petersen #12;Risø Energy Report 5 Renewable energy for power and transport Global energy policy today is dominated by three concerns: security of supply, climate change, and energy for development and poverty

  9. Ris Energy Report 8 The intelligent energy system infrastructure for the future

    E-Print Network [OSTI]

    Risø Energy Report 8 The intelligent energy system infrastructure for the future Risø-R-1695(EN) September 2009 Edited by Hans Larsen and Leif Sønderberg Petersen #12;Risø Energy Report 8 Edited by Hans Larsen and Leif Sønderberg Petersen, Risø National Laboratory for Sustainable Energy Technical University

  10. Completion report harmonic analysis of electrical distribution systems

    SciTech Connect (OSTI)

    Tolbert, L.M.

    1996-03-01T23:59:59.000Z

    Harmonic currents have increased dramatically in electrical distribution systems in the last few years due to the growth in non-linear loads found in most electronic devices. Because electrical systems have been designed for linear voltage and current waveforms; (i.e. nearly sinusoidal), non-linear loads can cause serious problems such as overheating conductors or transformers, capacitor failures, inadvertent circuit breaker tripping, or malfunction of electronic equipment. The U.S. Army Center for Public Works has proposed a study to determine what devices are best for reducing or eliminating the effects of harmonics on power systems typical of those existing in their Command, Control, Communication and Intelligence (C3I) sites.

  11. Data attribute rating system. Report for May-September 1994

    SciTech Connect (OSTI)

    Beck, L.L.; Peer, R.L.; Bravo, L.A.; Yan, Y.

    1995-04-01T23:59:59.000Z

    Emission inventories are being developed by policy makers and scientists in an effort to study emission trends. Because of the great variety of data and range of techniques used, the inventories vary considerably in their reliability and accuracy. It is difficult to compare emission estimates for different sources where widely different methodologies have been employed in their development. An inventory rating system can help to compare and evaluate inventories. The paper outlines a new emission inventory rating concept--the Data Attribute Rating System (DARS)--that has been developed by the Air and Energy Engineering Research Laboratory (AEERL) of the U.S. Environmental Protection Agency (EPA). The system was developed to rank global inventories of emissions of greenhouse gases. However, the DARS can be applied to emission inventories of any component (gases, particulates, criteria pollutants, toxics, etc.) at any scale.

  12. UBC Social Ecological Economic Development Studies (SEEDS) Student Report The UBC Food System: Indicators in the Measurement of Sustainability The

    E-Print Network [OSTI]

    UBC Social Ecological Economic Development Studies (SEEDS) Student Report The UBC Food System: Indicators in the Measurement of Sustainability The Sustainability of UBC Food System Collaborative Project System: Indicators in the Measurement of Sustainability The Sustainability of UBC Food System

  13. ADVANCED TURBINE SYSTEM CONCEPTUAL DESIGN AND PRODUCT DEVELOPMENT - Final Report

    SciTech Connect (OSTI)

    Albrecht H. Mayer

    2000-07-15T23:59:59.000Z

    Asea Brown Boveri (ABB) has completed its technology based program. The results developed under Work Breakdown Structure (WBS) 8, concentrated on technology development and demonstration have been partially implemented in newer turbine designs. A significant improvement in heat rate and power output has been demonstrated. ABB will use the knowledge gained to further improve the efficiency of its Advanced Cycle System, which has been developed and introduced into the marked out side ABB's Advanced Turbine System (ATS) activities. The technology will lead to a power plant design that meets the ATS performance goals of over 60% plant efficiency, decreased electricity costs to consumers and lowest emissions.

  14. Deep Well #4 Backup Power Systems Project Closeout Report

    SciTech Connect (OSTI)

    Jeremy Westwood

    2010-04-01T23:59:59.000Z

    The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

  15. Fermilab Central Computing Facility: Energy conservation report and mechanical systems design optimization and cost analysis study

    SciTech Connect (OSTI)

    Krstulovich, S.F.

    1986-11-12T23:59:59.000Z

    This report is developed as part of the Fermilab Central Computing Facility Project Title II Design Documentation Update under the provisions of DOE Document 6430.1, Chapter XIII-21, Section 14, paragraph a. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis and should be considered as a supplement to the Title I Design Report date March 1986 wherein energy related issues are discussed pertaining to building envelope and orientation as well as electrical systems design.

  16. Environmental Management System 2 2006 Site environmental report2-

    E-Print Network [OSTI]

    was designed to meet the rigorous requirements of the globally recognized International Organization: environmental management SyStem DRAFT gain registration to the ISO 400 and OHSAS 800 standards, an organization for Standardization (ISO) 14001 Environmental Management Standard, with additional emphasis on compliance, pollution

  17. Current Size and Remaining Market Potential of the U.S. Energy Service Company Industry

    Broader source: Energy.gov [DOE]

    "This report contains information on Current Size and Remaining Market Potential of the U.S. Energy Service Company Industry, prepared for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy, Weatherization and Intergovernmental Program."

  18. Welcome trust finance plc annual report and financial statements

    E-Print Network [OSTI]

    Rambaut, Andrew

    Welcome trust finance plc annual report and financial statements 2007 company number 5857955 #12 of the Directors the Directors of Wellcome trust Finance plc (the "Company") present their report and the audited

  19. Designing for cost In an aerospace company

    E-Print Network [OSTI]

    Hammar, Elizabeth (Elizabeth Deming)

    2014-01-01T23:59:59.000Z

    Companies take different approaches, and achieve different degrees of implementation, in designing products for cost. This thesis discusses Target Costing and its application at The Boeing Company. Target Costing is a ...

  20. Energy implications of integrated solid waste management systems. Final report

    SciTech Connect (OSTI)

    Little, R.E.; McClain, G.; Becker, M.; Ligon, P.; Shapiro, K.

    1994-07-01T23:59:59.000Z

    This study develops estimates of energy use and recovery from managing municipal solid waste (MSW) under various collection, processing, and disposal scenarios. We estimate use and recovery -- or energy balance -- resulting from MSW management activities such as waste collection, transport, processing, and disposal, as well as indirect use and recovery linked to secondary materials manufacturing using recycled materials. In our analysis, secondary materials manufacturing displaces virgin materials manufacturing for 13 representative products. Energy implications are expressed as coefficients that measure the net energy saving (or use) of displacing products made from virgin versus recycled materials. Using data developed for the 1992 New York City Master Plan as a starting point, we apply our method to an analysis of various collection systems and 30 types of facilities to illustrate bow energy balances shift as management systems are modified. In sum, all four scenarios show a positive energy balance indicating the energy and advantage of integrated systems versus reliance on one or few technology options. That is, energy produced or saved exceeds the energy used to operate the solid waste system. The largest energy use impacts are attributable to processing, including materials separation and composting. Collection and transportation energy are relatively minor contributors. The largest two contributors to net energy savings are waste combustion and energy saved by processing recycled versus virgin materials. An accompanying spatial analysis methodology allocates energy use and recovery to New York City, New York State outside the city, the U.S., and outside the U.S. Our analytical approach is embodied in a spreadsheet model that can be used by energy and solid waste analysts to estimate impacts of management scenarios at the state and substate level.

  1. Final Technical Report "Multiscale Simulation Algorithms for Biochemical Systems"

    SciTech Connect (OSTI)

    Petzold, Linda R.

    2012-10-25T23:59:59.000Z

    Biochemical systems are inherently multiscale and stochastic. In microscopic systems formed by living cells, the small numbers of reactant molecules can result in dynamical behavior that is discrete and stochastic rather than continuous and deterministic. An analysis tool that respects these dynamical characteristics is the stochastic simulation algorithm (SSA, Gillespie, 1976), a numerical simulation procedure that is essentially exact for chemical systems that are spatially homogeneous or well stirred. Despite recent improvements, as a procedure that simulates every reaction event, the SSA is necessarily inefficient for most realistic problems. There are two main reasons for this, both arising from the multiscale nature of the underlying problem: (1) stiffness, i.e. the presence of multiple timescales, the fastest of which are stable; and (2) the need to include in the simulation both species that are present in relatively small quantities and should be modeled by a discrete stochastic process, and species that are present in larger quantities and are more efficiently modeled by a deterministic differential equation (or at some scale in between). This project has focused on the development of fast and adaptive algorithms, and the fun- damental theory upon which they must be based, for the multiscale simulation of biochemical systems. Areas addressed by this project include: (1) Theoretical and practical foundations for ac- celerated discrete stochastic simulation (tau-leaping); (2) Dealing with stiffness (fast reactions) in an efficient and well-justified manner in discrete stochastic simulation; (3) Development of adaptive multiscale algorithms for spatially homogeneous discrete stochastic simulation; (4) Development of high-performance SSA algorithms.

  2. Shale-oil-recovery systems incorporating ore beneficiation. Final report.

    SciTech Connect (OSTI)

    Weiss, M.A.; Klumpar, I.V.; Peterson, C.R.; Ring, T.A.

    1982-10-01T23:59:59.000Z

    This study analyzed the recovery of oil from oil shale by use of proposed systems which incorporate beneficiation of the shale ore (that is concentration of the kerogen before the oil-recovery step). The objective was to identify systems which could be more attractive than conventional surface retorting of ore. No experimental work was carried out. The systems analyzed consisted of beneficiation methods which could increase kerogen concentrations by at least four-fold. Potentially attractive low-enrichment methods such as density separation were not examined. The technical alternatives considered were bounded by the secondary crusher as input and raw shale oil as output. A sequence of ball milling, froth flotation, and retorting concentrate is not attractive for Western shales compared to conventional ore retorting; transporting the concentrate to another location for retorting reduces air emissions in the ore region but cost reduction is questionable. The high capital and energy cost s results largely from the ball milling step which is very inefficient. Major improvements in comminution seem achievable through research and such improvements, plus confirmation of other assumptions, could make high-enrichment beneficiation competitive with conventional processing. 27 figures, 23 tables.

  3. Gamma-ray imaging system. Innovative technology summary report

    SciTech Connect (OSTI)

    NONE

    1998-11-01T23:59:59.000Z

    The RadScan 600 gamma-ray imaging system is designed to survey large surface areas for radiological contamination with accuracy and efficiency. The resulting survey data are clear, concise, and precise in describing how much contamination is present at exact locations. Data can be permanently stored electronically and on video tape, making storage and retrieval economical and efficient. This technology can perform accurate measurements in high radiation contamination areas while minimizing worker exposure. The RadScan 600 system is a safe and effective alternative to hand-held radiation detection devices. Performance data of the demonstrated survey area of the RadScan 600 system versus the baseline, which is the hand-held radiation detection devices (RO-2 and RO-7) for a given survey, production rate is 72% of the baseline. It should be noted that the innovative technology provides 100% coverage at a unit cost of $8.64/m{sup 2} versus a static measurement of a unit cost of $1.61/m{sup 2} for the baseline.

  4. Pentek metal coating removal system: Baseline report; Summary

    SciTech Connect (OSTI)

    NONE

    1997-07-31T23:59:59.000Z

    The Pentek metal coating removal system consists of the ROTO-PEEN Scaler, CORNER-CUTTER(R), and VAC-PAC(R). The system is designed to remove coatings from steel, concrete, brick, and wood. The Scaler uses 3M ROTO-PEEN tungsten carbide cutters, while the CORNER-CUTTER(R) uses solid needles for descaling activities. These are used with the VAC-PAC(R) vacuum system to capture dust and debris as removal of the coating takes place. The safety and health evaluation during the testing demonstration focused on two main areas of exposure: dust and noise. Dust exposure was minimal, but noise exposure was significant. Further testing for each exposure is recommended, since the outdoor environment where the testing demonstration took place may skew the results. It is feasible that dust and noise levels will be higher in an enclosed operating environment. Other areas of concern found were arm-hand vibration, whole-body vibration, ergonomics, heat stress, tripping hazards, electrical hazards, machine guarding, and lockout/tagout.

  5. Navy Mobility Fuels Forecasting System. Phase I report

    SciTech Connect (OSTI)

    Davis, R.M.; Hadder, G.R.; Singh, S.P.N.; Whittle, C.

    1985-07-01T23:59:59.000Z

    The Department of the Navy (DON) requires an improved capability to forecast mobility fuel availability and quality. The changing patterns in fuel availability and quality are important in planning the Navy's Mobility Fuels R and D Program. These changes come about primarily because of the decline in the quality of crude oil entering world markets as well as the shifts in refinery capabilities domestically and worldwide. The DON requested ORNL's assistance in assembling and testing a methodology for forecasting mobility fuel trends. ORNL reviewed and analyzed domestic and world oil reserve estimates, production and price trends, and recent refinery trends. Three publicly available models developed by the Department of Energy were selected as the basis of the Navy Mobility Fuels Forecasting System. The system was used to analyze the availability and quality of jet fuel (JP-5) that could be produced on the West Coast of the United States under an illustrative business-as-usual and a world oil disruption scenario in 1990. Various strategies were investigated for replacing the lost JP-5 production. This exercise, which was strictly a test case for the forecasting system, suggested that full recovery of lost fuel production could be achieved by relaxing the smoke point specifications or by increasing the refiners' gate price for the jet fuel. A more complete analysis of military mobility fuel trends is currently under way.

  6. Evaluation of integrated wall systems incorporating electrochromic windows [Final report

    SciTech Connect (OSTI)

    Sbar, Neil L.

    2001-03-30T23:59:59.000Z

    Billions of dollars are spent annually in the U.S. on energy lost through the use of inefficient windows. Even wall systems with advanced static glazings and moveable shading devices are not optimal because they can't effectively respond to changing solar conditions. Electrochromic (EC) smart windows can dynamically control the amount of solar light and heat entering a building. The energy saving performance of fully dynamic wall systems containing EC windows was compared with that of static systems using the DOE 2.1E building simulation program. Total costs for different scenarios were computed. SAGE demonstrated the capability to produce double pane EC windows in which the transmittance repeatedly varied between 2-58%. Relative impact of EC glazings in buildings compared to static is 10-20% energy savings across all climatic regions investigated. Significant life cycle cost savings are predicted for SAGE's EC windows when compared to conventional solar control windows over an estimated product lifetime of 20 years.

  7. Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical...

    Broader source: Energy.gov (indexed) [DOE]

    Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company:...

  8. LETTER TO SUCCESSFUL COMPANY OR ESCO | Department of Energy

    Office of Environmental Management (EM)

    SUCCESSFUL COMPANY OR ESCO LETTER TO SUCCESSFUL COMPANY OR ESCO Document features a letter template and sample to help Federal agencies inform an energy services company (ESCO)...

  9. LETTER TO UNSUCCESSFUL COMPANY OR ESCO | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UNSUCCESSFUL COMPANY OR ESCO LETTER TO UNSUCCESSFUL COMPANY OR ESCO Document features a letter template and sample to help Federal agencies inform energy service companies (ESCOs)...

  10. Nevada Geothermal Power Company, Inc. (Blue Mountain) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal Power Company, Inc. (Blue Mountain) Nevada Geothermal...

  11. Energy Audit Helps Small Company Stay Competitive

    Broader source: Energy.gov [DOE]

    The recommended improvements are saving the West Linn Paper Company in Oregon an annual cost of about $380,000.

  12. Plate-Based Fuel Processing System Final Report

    SciTech Connect (OSTI)

    Carlos Faz; Helen Liu; Jacques Nicole; David Yee

    2005-12-22T23:59:59.000Z

    On-board reforming of liquid fuels into hydrogen is an enabling technology that could accelerate consumer usage of fuel cell powered vehicles. The technology would leverage the convenience of the existing gasoline fueling infrastructure while taking advantage of the fuel cell efficiency and low emissions. Commercial acceptance of on-board reforming faces several obstacles that include: (1) startup time, (2) transient response, and (3) system complexity (size, weight and cost). These obstacles are being addressed in a variety of projects through development, integration and optimization of existing fuel processing system designs. In this project, CESI investigated steam reforming (SR), water-gas-shift (WGS) and preferential oxidation (PrOx) catalysts while developing plate reactor designs and hardware where the catalytic function is integrated into a primary surface heat exchanger. The plate reactor approach has several advantages. The separation of the reforming and combustion streams permits the reforming reaction to be conducted at a higher pressure than the combustion reaction, thereby avoiding costly gas compression for combustion. The separation of the two streams also prevents the dilution of the reformate stream by the combustion air. The advantages of the plate reactor are not limited to steam reforming applications. In a WGS or PrOx reaction, the non-catalytic side of the plate would act as a heat exchanger to remove the heat generated by the exothermic WGS or PrOx reactions. This would maintain the catalyst under nearly isothermal conditions whereby the catalyst would operate at its optimal temperature. Furthermore, the plate design approach results in a low pressure drop, rapid transient capable and attrition-resistant reactor. These qualities are valued in any application, be it on-board or stationary fuel processing, since they reduce parasitic losses, increase over-all system efficiency and help perpetuate catalyst durability. In this program, CESI took the initial steam reforming plate-reactor concept and advanced it towards an integrated fuel processing system. A substantial amount of modeling was performed to guide the catalyst development and prototype hardware design and fabrication efforts. The plate-reactor mechanical design was studied in detail to establish design guidelines which would help the plate reactor survive the stresses of repeated thermal cycles (from start-ups and shut-downs). Integrated system performance modeling was performed to predict system efficiencies and determine the parameters with the most significant impact on efficiency. In conjunction with the modeling effort, a significant effort was directed towards catalyst development. CESI developed a highly active, sulfur tolerant, coke resistant, precious metal based reforming catalyst. CESI also developed its own non-precious metal based water-gas shift catalyst and demonstrated the catalysts durability over several thousands of hours of testing. CESI also developed a unique preferential oxidation catalyst capable of reducing 1% CO to < 10 ppm CO over a 35 C operating window through a single pass plate-based reactor. Finally, CESI combined the modeling results and steam reforming catalyst development efforts into prototype hardware. The first generation 3kW(e) prototype was fabricated from existing heat-exchanger plates to expedite the fabrication process. This prototype demonstrated steady state operation ranging from 5 to 100% load conditions. The prototype also demonstrated a 20:1 turndown ratio, 10:1 load transient operation and rapid start-up capability.

  13. Once-through integral system (OTIS): Final report

    SciTech Connect (OSTI)

    Gloudemans, J R

    1986-09-01T23:59:59.000Z

    A scaled experimental facility, designated the once-through integral system (OTIS), was used to acquire post-small break loss-of-coolant accident (SBLOCA) data for benchmarking system codes. OTIS was also used to investigate the application of the Abnormal Transient Operating Guidelines (ATOG) used in the Babcock and Wilcox (B and W) designed nuclear steam supply system (NSSS) during the course of an SBLOCA. OTIS was a single-loop facility with a plant to model power scale factor of 1686. OTIS maintained the key elevations, approximate component volumes, and loop flow resistances, and simulated the major component phenomena of a B and W raised-loop nuclear plant. A test matrix consisting of 15 tests divided into four categories was performed. The largest group contained 10 tests and was defined to parametrically obtain an extensive set of plant-typical experimental data for code benchmarking. Parameters such as leak size, leak location, and high-pressure injection (HPI) shut-off head were individually varied. The remaining categories were specified to study the impact of the ATOGs (2 tests), to note the effect of guard heater operation on observed phenomena (2 tests), and to provide a data set for comparison with previous test experience (1 test). A summary of the test results and a detailed discussion of Test 220100 is presented. Test 220100 was the nominal or reference test for the parametric studies. This test was performed with a scaled 10-cm/sup 2/ leak located in the cold leg suction piping.

  14. Sulfur gas geochemical detection of hydrothermal systems. Final report

    SciTech Connect (OSTI)

    Rouse, G.E.

    1984-01-01T23:59:59.000Z

    The purpose of this investigation was to determine whether a system of exploration using sulfur gases was capable of detecting convecting hydrothermal systems. Three surveying techniques were used at the Roosevelt Hot Springs KGRA in Utah. These were (a) a sniffing technique, capable of instantaneous determinations of sulfur gas concentration, (b) an accumulator technique, capable of integrating the sulfur gas emanations over a 30 day interval, and (c) a method of analyzing the soils for vaporous sulfur compounds. Because of limitations in the sniffer technique, only a limited amount of surveying was done with this method. The accumulator and soil sampling techniques were conducted on a 1000 foot grid at Roosevelt Hot Springs, and each sample site was visited three times during the spring of 1980. Thus, three soil samples and two accumulator samples were collected at each site. The results are shown as averages of three soil and two accumulator determinations of sulfur gas concentrations at each site. Soil surveys and accumulator surveys were conducted at two additional KGRA's which were chosen based on the state of knowledge of these hydrothermal systems and upon their differences from Roosevelt Hot Springs in an effort to show that the exploration methods would be effective in detecting geothermal reservoirs in general. The results at Roosevelt Hot Springs, Utah show that each of the three surveying methods was capable of detecting sulfur gas anomalies which can be interpreted to be related to the source at depth, based on resistivity mapping of that source, and also correlatable with major structural features of the area which are thought to be controlling the geometry of the geothermal reservoir. The results of the surveys at Roosevelt did not indicate that either the soil sampling technique or the accumulator technique was superior to the other.

  15. Coal-fired high performance power generating system. Final report

    SciTech Connect (OSTI)

    NONE

    1995-08-31T23:59:59.000Z

    As a result of the investigations carried out during Phase 1 of the Engineering Development of Coal-Fired High-Performance Power Generation Systems (Combustion 2000), the UTRC-led Combustion 2000 Team is recommending the development of an advanced high performance power generation system (HIPPS) whose high efficiency and minimal pollutant emissions will enable the US to use its abundant coal resources to satisfy current and future demand for electric power. The high efficiency of the power plant, which is the key to minimizing the environmental impact of coal, can only be achieved using a modern gas turbine system. Minimization of emissions can be achieved by combustor design, and advanced air pollution control devices. The commercial plant design described herein is a combined cycle using either a frame-type gas turbine or an intercooled aeroderivative with clean air as the working fluid. The air is heated by a coal-fired high temperature advanced furnace (HITAF). The best performance from the cycle is achieved by using a modern aeroderivative gas turbine, such as the intercooled FT4000. A simplified schematic is shown. In the UTRC HIPPS, the conversion efficiency for the heavy frame gas turbine version will be 47.4% (HHV) compared to the approximately 35% that is achieved in conventional coal-fired plants. This cycle is based on a gas turbine operating at turbine inlet temperatures approaching 2,500 F. Using an aeroderivative type gas turbine, efficiencies of over 49% could be realized in advanced cycle configuration (Humid Air Turbine, or HAT). Performance of these power plants is given in a table.

  16. Plant Wide Energy Management and Reporting Systems Provide Sustainable Results

    E-Print Network [OSTI]

    Robinson, J. E.

    2007-01-01T23:59:59.000Z

    different steam production rates and operating conditions. Figure 3 - FFE Performance Calculation Basis TARGET PROFILE - PB#4 and PB#5 REMOVED Previous Advanced Control System - 1/1 to 12/31/2004 - 7,382 Hours 2004 Power Boiler PB#1, PB#2, and PB#3... of O p er at i o n Best 75th Ptile Poor Hours of Operation TARGET PROFILE - PB4 and PB5 Removed Previous Advanced Control Operational 1/1 to 12/31/2004-7,382 Hours Power Boiler PB#1, PB#2, and PB#3 - Excluding PB#4 and PB#5 Fossil Fuel Effectiveness...

  17. Optimization of storage in passive solar heating systems. Final report

    SciTech Connect (OSTI)

    Bahm, R.J.

    1980-05-01T23:59:59.000Z

    The search for a simple method of estimating the optimum amount of storage for passive solar space heating system designs and the results of that search are described. The project goals, and why the project is important are described. The major project results are presented in the order of their importance with respect to meeting the project goal. A narrative description of the project is given. Here the various approaches attempted are described, giving the reasons for failure in those areas that were not successful. The Appendices contain the bulk of data generated by this project. Most of the data is presented in graphical form. (MHR)

  18. PC Electronic Data Reporting Option (PEDRO) System - Patch Archive

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14 Dec-14 Jan-15LiquidBGOperable GeneratingWestSystem -

  19. Fuel Cell Systems Annual Progress Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdf Flash2006-52.pdf0.pdfDepartment of Energy's2ofFuel Cell FinancingSystems Annual

  20. UNDERSTANDING OUR COMPANY AN IBM PROSPECTUS

    E-Print Network [OSTI]

    a company or planned venture so that individuals can make informed decisions. Fully understanding the future lay in consolidation, and chose to bulk up. And then some companies just concluded that their core confidence in IBM's future. We have done much in recent years to transform our company. In a number

  1. ENERGY SERVICES COMPANIES SUMMARY OF RESPONSES

    E-Print Network [OSTI]

    a survey of the Energy Services Companies doing business in California. An Energy Services Company (ESCO. In addition, an ESCO frequently guarantees that the project's energy cost savings will be adequate to payCALIFORNIA ENERGY COMMISSION SUMMARY OF ENERGY SERVICES COMPANIES SUMMARY OF RESPONSES STAFFREPORT

  2. Ferrous scrap preheating system: Phase 3, Final report

    SciTech Connect (OSTI)

    NONE

    1996-05-13T23:59:59.000Z

    Utilizing electric arc smelters for making steel has allowed many smaller manufacturers to compete with large integrated mills. The electric arc furnace melts scrap to produce steel. The subject of this report is a Scrap Preheater that heats and cleans the arc furnace scrap using its own low cost natural gas energy supply. Scrap preheating can increase the capacity of a given arc furnace and reduce the operating costs. In addition it reduces the air emissions and allows utilization of lower cost scrap. The program was divided into three phases and was to culminate with an operating prototype at a demonstration host site steel mill. A host site agreement was executed and critical components were tested. The prototype scrap preheater was completely designed. It was sized to preheat 30 tons of scrap in a scrap bucket in 30 minutes. Energy is supplied by a rich fume reactor that completely oxidizes organics from the scrap and auxiliary natural gas. There were several delays and changes in the project that resulted in the host site requesting to withdraw from the program. Extensive efforts were made to secure a replacement host site. However, when another host could not be found, the project was terminated.

  3. Advanced worker protection system. Topical report, Phase I

    SciTech Connect (OSTI)

    Myers, J.

    1995-07-01T23:59:59.000Z

    The Department of Energy (DOE) is in the process of defining the magnitude and diversity of Decontamination and Decommissioning (D&D) obligations at its numerous sites. The DOE believes that existing technologies are inadequate to solve many challenging problems such as how to decontaminate structures and equipment cost effectively, what to do with materials and wastes generated, and how to adequately protect workers and the environment. Preliminary estimates show a tremendous need for effective use of resources over a relatively long period (over 30 years). Several technologies are being investigated which can potentially reduce D&D costs while providing appropriate protection to DOE workers. The DOE recognizes that traditional methods used by the EPA in hazardous waste site clean up activities are insufficient to provide the needed protection and worker productivity demanded by DOE D&D programs. As a consequence, new clothing and equipment which can adequately protect workers while providing increases in worker productivity are being sought for implementation at DOE sites. This project will result in the development of an Advanced Worker Protection System (AWPS). The AWPS will be built around a life support backpack that uses liquid air to provide cooling as well as breathing gas to the worker. The backpack will be combined with advanced protective garments, advanced liquid cooling garment, respirator, communications, and support equipment to provide improved worker protection, simplified system, maintenance, and dramatically improve worker productivity through longer duration work cycles.

  4. Navy Mobility Fuels Forecasting System Phase 4 report

    SciTech Connect (OSTI)

    Das, S.; Hadder, G.R.; Leiby, P.N.; Lee, R.; Davis, R.M.

    1988-09-01T23:59:59.000Z

    The Department of Navy's Maritime Strategy is designed to maintain military readiness and the ability to operate in all major theaters of the world. Mobility fuels required for sea, air, and land operations are vital components of the Navy's peacetime and wartime strategies. The purpose of the Navy's Mobility Fuels Technology Program is to understand fuel supply and fuel property impacts on Navy equipment performance and fleet readiness and operations. Oak Ridge National Laboratory (ORNL) has assisted the Department of Navy in developing and testing a methodology for forecasting mobility fuel availability, quality, and relative price, as well as evaluating options to increase fuel supplies during world oil supply disruptions. Publicly available models developed by the Energy Information Administration of the Department of Energy were selected as the foundation of the Navy Mobility Fuels Forecasting System (NMFFS). The NMFFS was enhanced as ORNL reviewed data on world oil reserves, production and prices, trends in crude oil and refined product quality, and changes in refinery process technology. The system was used to analyze the availability, quality, and relative price of military fuels that could be produced in several domestic and foreign refining regions under Business-As-Usual (BAU) and two hypothetical world crude oil disruption scenarios in the year 1995. 25 refs., 11 figs., 29 tabs.

  5. Canister Cleaning System Final Design Report Project A-2A

    SciTech Connect (OSTI)

    FARWICK, C.C.

    2000-06-15T23:59:59.000Z

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit.

  6. Environmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    , and health management into all work planning and execution. The purpose of BNL's ISMS is to ensure MANAGEMENT SYSTEM IDENTIFY AND ANALYZE HAZARDS ASSOCI- ATED WITH THE WORK: Hazards associated with the workEnvironmental Management System 2 2011 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  7. Environmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1

    E-Print Network [OSTI]

    management into all work planning and execution. The purpose of BNL's ISMS is to ensure that the way we do MANAGEMENT SYSTEM IDENTIFY AND ANALYZE HAZARDS ASSOCI- ATED WITH THE WORK: Hazards associated with the workEnvironmental Management System 2 2012 SITE ENVIRONMENTAL REPORT2-1 One of Brookhaven National

  8. TESLA Report No. 2000-26 September 2000 Fiber Optic Radiation Sensing Systems

    E-Print Network [OSTI]

    TESLA Report No. 2000-26 September 2000 Fiber Optic Radiation Sensing Systems for TESLA by H, Germany F. Wulf Hahn-Meitner-Institut HMI, Germany #12;Fiber Optic Radiation Sensing Systems for TESLA of refractive index at high radiation doses 4 3. Fiber optic dosimeter types for different TESLA sections 4 3

  9. Control of a Hydraulically-Powered Positioning System Project Report, Part 2

    E-Print Network [OSTI]

    Control of a Hydraulically-Powered Positioning System Project Report, Part 2 Written by Thomas Johnson ME6401: Linear Controls Submitted to Dr. Wayne Book 10/25/06 #12;SYSTEM MODEL AND PARAMETERS cylinder in order to control the position of an attached mass (m=200 kg). The circuit is controlled

  10. INSTRUMENT MENTOR MONTHLY SUMMARY REPORTING SYSTEM Doty, K. and Wagener, R.

    E-Print Network [OSTI]

    INSTRUMENT MENTOR MONTHLY SUMMARY REPORTING SYSTEM Doty, K. and Wagener, R. Brookhaven National in a particular instrument system, the ARM instrument mentor plays a key role in maintaining the quality of the data produced by the instruments. The mentor, although not directly responsible for daily monitoring

  11. A Preliminary Report on Static Analysis of C Code for Nuclear Reactor Protection System

    E-Print Network [OSTI]

    &C system in nuclear power plants consists of various safety and non-safety components. This paper triesA Preliminary Report on Static Analysis of C Code for Nuclear Reactor Protection System Jong-gu Republic of Korea (e-mail: {kirdess, atang34, jbyoo}@konkuk.ac.kr) **Korea Atomic Energy Research Institute

  12. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina. Final report

    SciTech Connect (OSTI)

    None

    1981-05-01T23:59:59.000Z

    Included in this report is detailed information regarding the design and installation of a heating and hot water system in a commercial application. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  13. ESPC ENABLE Energy Service Companies

    Broader source: Energy.gov [DOE]

    Energy Savings Performance Contract (ESPC) ENABLE projects use General Services Administration (GSA) Federal Supply Schedule 84, SIN 246-53 to select a qualified energy service company (ESCO). The ESCO is required to go through a two-step qualification process to become an eligible ESPC ENABLE or Schedule 84 service provider. The two-step process includes first, becoming Department of Energy (DOE)- qualified and second, being awarded a contract under the GSA Schedule.

  14. Technical analysis of US Army Weapons Systems and related advanced technologies of military interest. Final report

    SciTech Connect (OSTI)

    NONE

    1991-06-14T23:59:59.000Z

    This report summarizes the activities and accomplishments of an US Army technology security project designed to identify and develop effective policy guidelines for militarily critical technologies in specific Army systems and in broad generic technology areas of military interest, Individual systems analyses are documented in separate Weapons Systems Technical Assessments (WSTAs) and the general generic technology areas are evaluated in the Advanced Technology Assessment Reports (ATARs), However, specific details of these assessments are not addressed here, only recommendations regarding aspects of the defined approach, methodology, and format are provided and discussed.

  15. Energy Sources and Systems Analysis: 40 South Lincoln Redevelopment District (Short Report)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01T23:59:59.000Z

    This report presents the a brief overview of the results of a case study to analyze district energy systems for their potential use in a project that involves redeveloping 270 units of existing public housing, along with other nearby sites. When complete, the redevelopment project will encompass more than 900 mixed-income residential units, commercial and retail properties, and open space. The analysis estimated the hourly heating, cooling, domestic hot water, and electric loads required by the community; investigated potential district system technologies to meet those needs; and researched available fuel sources to power such systems. A full report of this case study is also available.

  16. PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PIA - Firehouse Staff Activity and Training System, Bechtel Jacobs Company LLC PIA - Firehouse Staff...

  17. Navy mobility fuels forecasting system. Phase II, report

    SciTech Connect (OSTI)

    Hadder, G.R.; Vineyard, T.A.; Das, S.; Lee, R.

    1986-06-01T23:59:59.000Z

    The Department of the Navy (DON) requires an improved capability to forecast mobility fuel availability and quality. The changing patterns in fuel availability and quality are important in planning the Navy's fuel use strategy and the Mobility Fuels Technology Program. Until recently, there has been a long-term decline in the quality of crude oil entering world markets and a shift in refinery capacities domestically and worldwide. Three publicly available models developed by the Energy Information Administration of the Department of Energy were selected as the basis of the Navy Mobility Fuels Forecasting System (NMFFS). The system was used to analyze the availability and quality of jet fuel (JP-5) and diesel fuel (F-76) that could be produced in several domestic and foreign refinery regions under business-as-usual and four hypothetical world crude oil disruption scenarios in 1990. The results from the study indicate that jet fuel availability could be reduced in some refinery regions under the disruptions studied. Various strategies were investigated for increasing JP-5 production during the disruptions. In general, the availability of JP-5 was more limited than F-76 under the disruption cases studied; however, in all cases one or more strategies were identified to increase refinery output of JP-5 in all study regions. Based on the four hypothetical disruption scenarios studied, the analysis suggested tat JP-5 production could be increased by relaxing the smoke point, freezing point, flash point, and by increasing the refiners' gate price for the jet fuel in the study regions. A more complete analysis of navy mobility fuel trends, as well as several changes in the models to make them easier to use in fuel planning and forecastig studies, are planned as part of the third phase of this program.

  18. TITLE III EVALUATION REPORT FOR THE MATERIAL AND PERSONNEL HANDLING SYSTEM

    SciTech Connect (OSTI)

    T. A. Misiak

    1998-05-21T23:59:59.000Z

    This Title III Evaluation Report (TER) provides the results of an evaluation that was conducted on the Material and Personnel Handling System. This TER has been written in accordance with the ''Technical Document Preparation Plan for the Mined Geologic Disposal System Title III Evaluation Reports'' (BA0000000-01717-4600-00005 REV 03). The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Material and Personnel Handling System. Recommendations for resolving discrepancies between the as-constructed system, the technical baseline requirements, and the baseline design are included in this report. Cost and Schedule estimates are provided for all recommended modifications.

  19. Audit report: the US Department of Energy's procurement and assistance data system

    SciTech Connect (OSTI)

    Friedman, Gregory H.

    1999-01-01T23:59:59.000Z

    The Procurement and Assistance Data System (PADS) is the Department's official computerized system maintained to collect, track, and report Department of Energy procurement and financial assistance actions. The system stores information used to (1) monitor procurement and financial assistance processes, awards, and administration; (2) provide required recurring reports to the Office of Management and Budget, General Services Administration, Department of Commerce, and Small Business Administration; and (3) satisfy Freedom of Information Act and congressional requests and other public inquiries. The objectives of this audit were to determine whether the system (1) contained accurate, complete, and current data, (2) met user needs and regulatory requirements and (3) met generally accepted system practices for development and operation. The review was part of the Office of Inspector General's continuing work with respect to the agency's information systems and compliance with the Government and Performance Results Act of 1993.

  20. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

  1. Blast Furnace Granulated Coal Injection System Demonstration Project public design report. Topical report

    SciTech Connect (OSTI)

    NONE

    1995-03-01T23:59:59.000Z

    The public design report describes the Blast Furnace Granulated Coal Injection (BFGCI) project under construction at Bethlehem Steel Corporation`s (BSC) Burns Harbor, Indiana, plant. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. The project is the first installation in the United States for the British Steel technology using granular coal in blast furnaces. The objective is to demonstrate that granular coal is an economic and reliable fuel which can successfully be applied to large North American blast furnaces. These include: coal grind size, coal injection rate, coal source (type) and blast furnace conversion method. To achieve the program objectives, the demonstration project is divided into the following three Phases: Phase I-Design; Phase II-Procurement & Construction; and Phase III-Operation. Preliminary design (Phase I) began in 1991 with detailed design commencing in April 1993. Construction at Burns Harbor (Phase II) began August 1993. Construction is expected to be complete in the first quarter of 1995 which will be followed by a demonstration test program (Phase III).

  2. General Electric Company Evaluation of Sustainable Energy Options

    E-Print Network [OSTI]

    and performance of each electricity infrastructure scenario in various timescales of power system operation. In addition, three different 2018 electricity infrastructure scenarios were developed. The impact of eachGeneral Electric Company Evaluation of Sustainable Energy Options for the Big Island of Hawaii

  3. Companies Hiring by Majors Booth # Organization Name Majors Recruited

    E-Print Network [OSTI]

    Azevedo, Ricardo

    Pont Electrical,Mechanical,Chemical 83 Eaton Corporation Electrical,Mechanical #12;Companies Hiring by Majors),Computer & Systems,Industrial,Aerospace 106 BASF Corporation Electrical,Mechanical,Civil,Chemical 86 Bayer Technology Engineering Corporation Engineering 108 Conestoga-Rovers & Associates Engineering 3/4 Conoco

  4. Information Visualization Evaluation in Large Companies: Challenges, Experiences and Recommendations

    E-Print Network [OSTI]

    Isenberg, Petra

    environments, whereas field experiments are a compromise strategy where features of the system are ma visualization and visual analyt- ics tools within a large automotive company (BMW Group). From our own visualization in general. Within such an environment a wide range of real data analy- sis problems, tasks

  5. Design analysis report for the TN-WHC cask and transportation system

    SciTech Connect (OSTI)

    Brisbin, S.A., Fluor Daniel Hanford

    1997-02-13T23:59:59.000Z

    This document presents the evaluation of the Spent Nuclear Fuel Cask and Transportation System. The system design was developed by Transnuclear, Inc. and its team members NAC International, Nelson Manufacturing, Precision Components Corporation, and Numatec, Inc. The cask is designated the TN-WHC cask. This report describes the design features and presents preliminary analyses performed to size critical dimensions of the system while meeting the requirements of the performance specification.

  6. Energy Management of Steam Distribution Systems Through Energy Audits and Computerized Reporting Programs

    E-Print Network [OSTI]

    Rivers, N.; Mandzuk, N.

    ENERGY KANAGEKBNT OF STEAM DISTRIBUTION SYSTEMS THROUGH BNKRGY AUDITS AND COItPlTl'ERIZED REPORTING PROGRAtIS NORMAN J. RIVERS and HARTIN MANDZUK Armstrong Machine Works, Inc. Three Rivers, Michigan ABSTRACT This presentation will highlight... the economic losses associated with steam distribution systems and how to establish good energy management programs to reduce energy cost by 15 to 25 percent. Recognizing energy losses in steam systems involves I 1. Steam lost through defective valves...

  7. Power Systems of the Future: A 21st Century Power Partnership Thought Leadership Report (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01T23:59:59.000Z

    Powerful trends in technology, policy environments, financing, and business models are driving change in power sectors globally. In light of these trends, the question is no longer whether power systems will be transformed, but rather how these transformations will occur. Power Systems of the Future, a thought leadership report from the 21st Century Power Partnership, explores these pathways explores actions that policymakers and regulators can take to encourage desired power system outcomes.

  8. WABCO Automotive UK Ltd is part of American Standard Companies Inc. As

    E-Print Network [OSTI]

    Berzins, M.

    WABCO Automotive UK Ltd is part of American Standard Companies Inc. As one of the world's premier automotive products companies, it supplies braking and other control systems to the commercial vehicle and de-sorb moisture. They also discovered that contamination from the vehicle WABCO AUTOMOTIVE UK LTD

  9. Cooperative field test program for wind systems. Final report

    SciTech Connect (OSTI)

    Bollmeier, W.S. II; Dodge, D.M.

    1992-03-01T23:59:59.000Z

    The objectives of the Federal Wind Energy Program, managed by the US Department of Energy (DOE), are (1) to assist industry and utilities in achieving a multi-regional US market penetration of wind systems, and (2) to establish the United States as the world leader in the development of advanced wind turbine technology. In 1984, the program conducted a series of planning workshops with representatives from the wind energy industry to obtain input on the Five-Year Research Plan then being prepared by DOE. One specific suggestion that came out of these meetings was that the federal program should conduct cooperative research tests with industry to enhance the technology transfer process. It was also felt that the active involvement of industry in DOE-funded research would improve the state of the art of wind turbine technology. DOE established the Cooperative Field Test Program (CFTP) in response to that suggestion. This program was one of the first in DOE to feature joint industry-government research test teams working toward common objectives.

  10. Rooftop PV system. Final technical progress report, Phase II

    SciTech Connect (OSTI)

    NONE

    1995-08-01T23:59:59.000Z

    Under this four-year PV:BONUS Program, ECD and United Solar are developing and demonstrating two new lightweight flexible building integrated Photovoltaic (BIPV) modules specifically designed as exact replacements for conventional asphalt shingles and standing seam metal roofing. These modules can be economically and aesthetically integrated into new residential and commercial buildings, and address the even larger roofing replacement market. The modules are designed to be installed by roofing contractors without special training which minimizes the installation and balance of system costs. The modules will be fabricated from high-efficiency, multiple-junction a-Si alloy solar cells developed by ECD and United Solar. Under the Phase I Program, which ended in March 1994, we developed two different concept designs for rooftop PV modules: (1) the United Solar overlapping (asphalt shingle replacement) shingle-type modules and (2) the ECD metal roof-type modules. We also developed a plan for fabricating, testing and demonstrating these modules. Candidate demonstration sites for our rooftop PV modules were identified and preliminary engineering designs for these demonstrations were developed; a marketing study plan was also developed. The major objectives of the Phase II Program, which started in June 1994 was (1) to develop, test, and qualify these new rooftop modules; (2) to develop mechanical and electrical engineering specifications for the demonstration projects; and (3) to develop a marketing/commercialization plan.

  11. Dalhousie University Investment Committee Report to the Board of Governors

    E-Print Network [OSTI]

    Dellaire, Graham

    oil and gas companies that are reported to have the largest carbon reserves. · The Board of Governors companies with the largest carbon reserves, as provided by Divest Dal. It was observed that a number of steel companies were included in the list of 100 companies with large coal reserves. Dalhousie

  12. Waste systems. Progress report, January 1982-February 1983

    SciTech Connect (OSTI)

    Hickle, G.L.

    1983-10-24T23:59:59.000Z

    A laboratory-scale beryllium electrorefining cell has been placed in operation and metallic beryllium with a purity greater than 99.95% has been produced. Methods of uranium chip disposal have been evaluated by performing bench- and pilot-scale testing and by surveying present chip disposal methods. A design criteria has been completed for a new production uranium chip disposal facility. Two types of cementation immobilization processes are being developed to treat several Rocky Flats wastes which do not currently meet repository acceptance criteria. The nitrate salts, as now shipped, are an extremely fine powder, composed chiefly of sodium and potassium nitrate. Nitrates are an oxidizer, and their behavior in a possible fire would be of concern. Accident caused fires involving a cargo of boxed nitrate salts were modeled and the burning characteristics noted. In addition, gypsum cement was tested as an immobilization matrix to reduce dispersibility. A program is in process to construct a facility to remotely size reduce gloveboxes and miscellaneous equipment contaminated with plutonium and other radioactive nuclides. The Title II engineering package is completed and the construction of the facility has been initiated. Modification and additions to the 82 kg/h Fluidized Bed Incinerator were made in preparation for turning the unit over to Production. A program was initiated to identify, characterize, and evaluate for recycle all the spent oil and solvent streams which are immobilized and disposed as Transuranic (TRU) waste. Three technologies were evaluted for denitrification method was studied at Rocky Flats while a thermal decomposition process and a molten salt chemical conversion technique were investigated on a subcontract basis with Thagard Research Corporation and Rockwell International, Energy Systems Group, respectively.

  13. Marine Tactical Command and Control System (MTACCS) Field Development System-1 (FDS-1) assessment: Final report

    SciTech Connect (OSTI)

    Avery, L.W.; Hunt, S.T.; Savage, S.F. (Pacific Northwest Lab., Richland, WA (United States)); McLaughlin, P.D.; Shepdard, A.P.; Worl, J.C. (Battelle Seattle Research Center, WA (United States))

    1992-04-01T23:59:59.000Z

    The United State Marine Corps (USMC) is continuing the development and fielding of the Marine Corps Tactical Command and Control System (MTACCS), a system which exists in varying states of development, fielding, or modernization. MTACCS is currently composed of the following components: Tactical Combat Operations System (TCO) for ground command and control (C2), Intelligence Analysis System (IAS) with a Genser terminal connected to a TCO workstation for intelligence C2, Marine Integrated Personnel System (MIPS) and a TCO workstation using the Marine Combat Personnel System (MCPERS) software for personnel C2, Marine Integrated Logistics System (MILOGS) which is composed of the Landing Force Asset Distribution System (LFADS), the Marine Air-Ground Task Force (MAGTF) II, and a TCO terminal using the Marine Combat Logistics System (MCLOG) for logistics C2, Marine Corps Fire Support System (MCFSS) for fire support C2, and Advanced Tactical Air Command Central (ATACC) and the Improved Direct Air Support Central for aviation C2.

  14. Overview Report: Normal and Emergency Operation Visualization

    SciTech Connect (OSTI)

    Greitzer, Frank L.

    2011-05-01T23:59:59.000Z

    This is an overview report to document and illustrate methods used in a project entitled “Normal and Emergency Operations Visualization” for a utility company, conducted in 2009-2010 timeframe with funding from the utility company and the U.S. Department of Energy. The original final report (about 180 pages) for the project is not available for distribution because it alludes to findings that assessed the design of an operational system that contained proprietary information; this abridged version contains descriptions of methods and some findings to illustrate the approach used, while avoiding discussion of sensitive or proprietary information. The client has approved this abridged version of the report for unlimited distribution to give researchers and collaborators the benefit of reviewing the research concepts and methods that were applied in this study.

  15. An accounting system for small bus companies

    E-Print Network [OSTI]

    Gates, Howard Marion

    1944-01-01T23:59:59.000Z

    &ed in ths oost. Baterial snd Supplies inalude tools, repair parts, fuel ~ tires and tubes, and tioksts, Dsbitc This aoaount is ohargad with the oast of all supplies purahased~ ltaterials reaovored in aonstruatian and saleage operations, whish are to bo...

  16. An accounting system for motor taxicab companies

    E-Print Network [OSTI]

    Morris, Joe Milton

    1950-01-01T23:59:59.000Z

    tel . ie checl sd m the Gntxt nnnner ~ "it tho end of vhe Shift~ =-N G oets Ii~~!I hc conhi!Icd cnd 002/~" OIlc totc1 hc Qntened on thc . ". hstor Sheet, Porn nlxfoor 2? fcr each driver, Othox' ccetl col1ectione Qrc h~ed in 8 GL~~QF Rennes'a JA..., . ':Wa, 92, ? e~d Lab x'" c'EAa i '. ya "z"a ma';, a3ia n" -c " ' cna' of' iabca an: 3'. ed M qnx~shecl WK~a "'~d X '&". ': a'a:o'. aiz " 8, ~ac=ncila 7 " " t' a aaaux'aj acca'. Qlt ~ ;~a". "'. aaq ~i&i xya a tKN-'1 anal. o Gx' ". wK1 a:ding Qxlc1 p...

  17. 2-D linear motion system. Innovative technology summary report

    SciTech Connect (OSTI)

    NONE

    1998-11-01T23:59:59.000Z

    The US Department of Energy's (DOE's) nuclear facility decontamination and decommissioning (D and D) program requires buildings to be decontaminated, decommissioned, and surveyed for radiological contamination in an expeditious and cost-effective manner. Simultaneously, the health and safety of personnel involved in the D and D activities is of primary concern. D and D workers must perform duties high off the ground, requiring the use of manlifts or scaffolding, often, in radiologically or chemically contaminated areas or in areas with limited access. Survey and decontamination instruments that are used are sometimes heavy or awkward to use, particularly when the worker is operating from a manlift or scaffolding. Finding alternative methods of performing such work on manlifts or scaffolding is important. The 2-D Linear Motion System (2-D LMS), also known as the Wall Walker{trademark}, is designed to remotely position tools and instruments on walls for use in such activities as radiation surveys, decontamination, and painting. Traditional (baseline) methods for operating equipment for these tasks require workers to perform duties on elevated platforms, sometimes several meters above the ground surface and near potential sources of contamination. The Wall Walker 2-D LMS significantly improves health and safety conditions by facilitating remote operation of equipment. The Wall Walker 2-D LMS performed well in a demonstration of its precision, accuracy, maneuverability, payload capacity, and ease of use. Thus, this innovative technology is demonstrated to be a viable alternative to standard methods of performing work on large, high walls, especially those that have potential contamination concerns. The Wall Walker was used to perform a final release radiological survey on over 167 m{sup 2} of walls. In this application, surveying using a traditional (baseline) method that employs an aerial lift for manual access was 64% of the total cost of the improved technology. However, for areas over approximately 600 m{sup 2}, the Wall Walker would cost less than the baseline. Using the Wall Walker 2-D LMS, ALARA exposure and worker safety is improved, and there is potential for increased productivity. This innovative technology performed better than the baseline by providing real-time monitoring of the tool or instrument position. Also, the Wall Walker 2-D LMS can traverse any two-dimensional path at constant speeds of up to 18.3 linear meters per minute (60 linear feet per minute). The survey production rate for the innovative technology was about 0.6 m{sup 2}/min (6 ft{sup 2}/min); the baseline production rate was approximately 0.3 m{sup 2}/min (3 ft{sup 2}/min), using the same surveying instrument and maximum scanning rate.

  18. Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report

    SciTech Connect (OSTI)

    NONE

    1997-03-01T23:59:59.000Z

    The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts contained in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.

  19. Model documentation report: Commercial Sector Demand Module of the National Energy Modeling System

    SciTech Connect (OSTI)

    NONE

    1995-02-01T23:59:59.000Z

    This report documents the objectives, analytical approach and development of the National Energy Modeling System (NEMS) Commercial Sector Demand Module. The report catalogues and describes the model assumptions, computational methodology, parameter estimation techniques, model source code, and forecast results generated through the synthesis and scenario development based on these components. This report serves three purposes. First, it is a reference document providing a detailed description for model analysts, users, and the public. Second, this report meets the legal requirement of the Energy Information Administration (EIA) to provide adequate documentation in support of its statistical and forecast reports (Public Law 93-275, section 57(b)(1)). Third, it facilitates continuity in model development by providing documentation from which energy analysts can undertake model enhancements, data updates, and parameter refinements as future projects.

  20. ORNL superconducting technology program for electric power systems. Annual report for FY 1993

    SciTech Connect (OSTI)

    Hawsey, R.A. [comp.

    1994-04-01T23:59:59.000Z

    The Oak Ridge National Laboratory (ORNL) Superconducting Technology Program is conducted as part of a national effort by the US Department of Energy`s Office of Energy Efficiency and Renewable Energy to develop the technology base needed by US industry for commercial development of electric power applications of high-temperature superconductivity. The two major elements of this program are conductor development and applications development. This document describes the major research and development activities for this program together with related accomplishments. The technical progress reported was summarized from information prepared for the FY 1993 Annual Program Review held July 28--29, 1993. This ORNL program is highly leveraged by the staff and other resources of US industry and universities. In fact, nearly three-fourths of the ORNL effort is devoted to industrial competitiveness projects with private companies. Interlaboratory teams are also in place on a number of industry-driven projects. Patent disclosures, working group meetings, staff exchanges, and joint publications and presentations ensure that there is technology transfer to US industry. Working together, the collaborative teams are making rapid progress in solving the scientific and technical issues necessary for the commercialization of long lengths of practical high-temperature superconductor wire and wire products.