National Library of Energy BETA

Sample records for reporting requirements title

  1. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 2001

    SciTech Connect (OSTI)

    Margorie Stockton

    2003-04-01

    Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2001, the Technical Area 3 steam plant was the primary source of criteria air pollutants from the Laboratory, while research and development activities were the primary source of volatile organic compounds. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions from chemical use for research and development activities were also reported.

  2. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 1997

    SciTech Connect (OSTI)

    1999-01-01

    Los Alamos National Laboratory (the Laboratory) is subject to emissions reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73, (20 NMAC 2.73), Notice of Intent and Emissions Inventory Requirements. The Laboratory has the potential to emit 100 tons per year of suspended particulate matter (PM), nitrogen oxides (NO{sub x}), carbon monoxide (CO), and volatile organic compounds (VOCs). For 1997, combustion products from the industrial sources contributed the greatest amount of regulated air emissions from the Laboratory. Research and development activities contributed the greatest amount of VOCs. Emissions of beryllium and aluminum were reported for activities permitted under 20 NMAC 2.72, Construction Permits.

  3. Emissions Inventory Report Summary Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20 NMAC 2.73) for Calendar Year 1998

    SciTech Connect (OSTI)

    Air Quality Group, ESH-17

    1999-09-01

    Los Alamos National Laboratory (the Laboratory) is subject to emissions reporting requirements for regulated air contaminants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20 NMAC 2.73), Notice of Intent and Emissions Inventory Requirements. The Laboratory has the potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, and volatile organic compounds. For 1998, combustion products from the industrial sources contributed the greatest amount of criteria air pollutants from the Laboratory. Research and development activities contributed the greatest amount of volatile organic compounds. Emissions of beryllium and aluminum were reported for activities permitted under 20 NMAC 2.72 Construction Permits.

  4. Emissions Inventory Report Summary: Reporting Requirements for the New Mexico Administrative Code, Title 20, Chapter 2, Part 73 (20.2.73 NMAC) for Calendar Year 2003

    SciTech Connect (OSTI)

    M. Stockton

    2005-01-01

    Los Alamos National Laboratory is subject to annual emissions-reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. For calendar year 2003, the Technical Area 3 steam plant and the air curtain destructors were the primary sources of criteria air pollutants from the Laboratory, while the air curtain destructors and chemical use associated with research and development activities were the primary sources of volatile organic compounds and hazardous air pollutants. Emissions of beryllium and aluminum were reported for activities permitted under 20.2.72 NMAC. Hazardous air pollutant emissions were reported from chemical use as well as from all combustion sources. In addition, estimates of particulate matter with diameter less than 2.5 micrometers and ammonia were provided as requested by the New Mexico Environment Department, Air Quality Bureau.

  5. Contract to coordinate on-going documentation requirements associated with Title X legislation for DOE active-solar activities. Final project technical report

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    The objectives of this work were to ensure that Title X Active Solar Program reports complied with all guidance regarding length, format, coverage, tone, tables and schedules; provide necessary Conservation and Renewable Energy Office background and back-up material; follow this activity through to its completion in January 1982; assess information requirements associated with on-going documentation of Federal Buildings Program and its predecessors; establish a method for collecting, maintaining and utilizing appropriate program data specifically related to the preparation of report due in June 1982. Work on this project has generally remained on schedule and within budget. DOE-SAN has been instrumental in keeping us on track, by providing timely guidance as needed. Attached are recommendations and methods for documenting solar heat technologies research and the Title X sunset policy, planning, and evaluation long report for Active Solar Heating and Cooling Program.

  6. Should Title 24 Ventilation Requirements Be Amended to include...

    Office of Scientific and Technical Information (OSTI)

    include an Indoor Air Quality Procedure? Citation Details In-Document Search Title: Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure? ...

  7. Catalytic oxidizers and Title V requirements

    SciTech Connect (OSTI)

    Uberoi, M.; Rach, S.E.

    1999-07-01

    Catalytic oxidizers have been used to reduce VOC emissions from various industries including printing, chemical, paint, coatings, etc. A catalytic oxidizer uses a catalyst to reduce the operating temperature for combustion to approximately 600 F, which is substantially lower than thermal oxidation unit. Title V requirements have renewed the debate on the best methods to assure compliance of catalytic oxidizers, with some suggesting the need for continuous emission monitoring equipment. This paper will discuss the various aspects of catalytic oxidation and consider options such as monitoring inlet/outlet temperatures, delta T across the catalyst, periodic laboratory testing of catalyst samples, and preventive maintenance procedures as means of assuring continuous compliance.

  8. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  9. Memorandum, Clarification of Requirements for Certification in Title 10

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Code of Federal Regulations Part 712, Human Reliability Program | Department of Energy Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human Reliability Program Memorandum, Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human Reliability Program August 20, 2013 Clarification of Requirements for Certification in Title 10 Code of Federal Regulations Part 712, Human Reliability Program

  10. TYPE REPORT DOCUMENT TITLE HERE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NETL's ARRA Site Characterization Initiative: Accomplishments DOE/NETL-000/000000 ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

  11. Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the U.S. Code of Federal Regulations as codified on December 31, 1993; Revision 1

    SciTech Connect (OSTI)

    Collins, M.; Shelton, B.

    1994-07-01

    This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the code of Federal Regulations, Chapter 1, on December 31, 1993. It also includes, in a separate section, any of those requirements that were superseded or discontinued between January 1992 and December 1993. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation. The Office of Information Resources Management staff compiled this listing of reporting and recordkeeping requirements to briefly describe each in a single document primarily to help licensees readily identify the requirements. The compilation is not a substitute for the regulations, and is not intended to impose any new requirements or technical positions. It is part of NRC`s continuing efforts to comply with the Paperwork Reduction Act of 1980 and the Office of Management and Budget regulations that mandate effective and efficient Federal information resources management programs.

  12. DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled

    Energy Savers [EERE]

    "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" | Department of Energy RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband

  13. Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  14. Title I Disposal Sites Annual Report | Department of Energy

    Energy Savers [EERE]

    I Disposal Sites Annual Report Title I Disposal Sites Annual Report 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites (March 2015) PDF icon 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites (March 2015) More Documents & Publications Title II

  15. Title II Disposal Sites Annual Report | Department of Energy

    Energy Savers [EERE]

    II Disposal Sites Annual Report Title II Disposal Sites Annual Report 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites (November 2014) PDF icon 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites (November 2014) More Documents & Publications Title I

  16. Final scientific report for DOE award title: Improving the Representat...

    Office of Scientific and Technical Information (OSTI)

    scientific report for DOE award title: Improving the Representation of Ice Sedimentation Rates in Global Climate Models Citation Details In-Document Search Title: Final scientific ...

  17. Title

    Broader source: Energy.gov (indexed) [DOE]

    Grant and Loan Recipients 1 Outline of Presentation * Basic Background on Recovery Act * ... 4 OMB Reporting Requirements * All Prime Grant and Loan Recipients whose award was signed ...

  18. Title 43 CFR 3264 Reports - Drilling Operations | Open Energy...

    Open Energy Info (EERE)

    Title 43 CFR 3264 Reports - Drilling Operations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  19. National Energy Policy Plan; A Report to Congress Required by Title VIII of the Department of Energy Organization Act (Public Law 95-91)

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    This plan report is divided into the following chapters: the course ahead, currently predominant fuels (oil, gas), America's energy triad, sources of diversity and long-term supply, sources of uncertainty, summary of current projections, and public comments on the nation's policy toward energy. (DLC)

  20. BER Science Network Requirements (Technical Report) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: BER Science Network Requirements Citation Details In-Document Search Title: BER Science Network Requirements The Energy Sciences Network (ESnet) is the primary ...

  1. Title:

    National Nuclear Security Administration (NNSA)

    Title: 2008 Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan U.S. Department of Energy Date: December 2008 Los Alamos National Laboratory, an affirmative action/equal opportunity employer, is operated by the Los Alamos National Security, LLC for the National Nuclear Security Administration of the U.S. Department of Energy under contract DE-AC52-06NA25396. By acceptance of this article, the publisher

  2. Title

    U.S. Energy Information Administration (EIA) Indexed Site

    Name Title Date Cap and Trade: the Lieberman-Warner Climate Security Act of 2007 John Steelman April 2011 The Future of Onshore Oil & Gas Production 1 Largest New Source: Existing Oil Fields 2 How we produce oil matters NETL 2008 3 How we produce oil matters NETL 2008 CO 2 -EOR in Permian Basin w/ natural CO 2 NETL 2010 71 4 How we produce oil matters NETL 2008 CO 2 -EOR in Permian Basin w/ natural CO 2 NETL 2010 -157 CO 2 -EOR in Permian Basin w/ CCS 71 5 Where we produce gas matters 6

  3. TITLE

    Office of Legacy Management (LM)

    WE/OR/20722-275 102-HSP-01 Rev. 1 HEALTH AND SAFETY PLAN FOR THE ALBANY RESEARCH CENTER SITE SEFTEMBER 1990 Prepared for United S t a t e s Department of Energy Oak Ridge Operations Office Under Contract N o . DE-AC05-810R20722 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job N o . 14501 TITLE : HEALTH AND SAFETY PLAN FOR THE U Y RESEARCH CENTER SITE DDCUMENT NUMBER: 102-HSP-01 REVISION NUMBER: 1 PROJECT: PUSPAP JOB NO. : 1 4 5 0 1 REVIEW: ~a fetf Services REVIEWED: REVIEWED : APPROVED:

  4. TITLE

    Office of Legacy Management (LM)

    ... state environmental and land-use requirements t o the ... is assumed to have complied with contractual requirements. ... from the machining of natural uranium (neither depleted ...

  5. Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report

    Broader source: Energy.gov [DOE]

    Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report.

  6. Title

    National Nuclear Security Administration (NNSA)

    (USGS Open file Report 92-xxxx) Author Laczniak, R. J., Cole, J. C, Sawyer D.A. and Trudeau, D. A. Document Date 5792 Document Type Report Recipients DOENV 100960 ...

  7. Title

    National Nuclear Security Administration (NNSA)

    ... The population of Lathrop Wells in 1984 was reported as 45 (Smith and Coogan, 1984), ... Series Report 54, 25p. Smith, D.D. and J.S. Coogan, 1984. Population ...

  8. TITLE

    Office of Legacy Management (LM)

    ... In accordance with these requirements, plans ... to stimulate natural gas production. The 65-hectare (160-acre) Gasbuggy Gas Stimulation ... The principal land use is grazing, although a ...

  9. TITLE

    Office of Legacy Management (LM)

    ... stimulating the flow of natural gas by fracturing rock ... FlocdplainWetlands Environmental Review Requirements". ... WETLAND DERMINATIOH DATA FORM ROUTINE Wl3lAND DEERMINATION ...

  10. TITLE

    Office of Legacy Management (LM)

    ... (Carson National Forest) land that is withdrawn by the ... rock formations and stimulate the flow of natural gas. ... If scientific or technical requirements do not permit ...

  11. Microsoft Word - DOE Final Report Title Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CO 2 Foam Concepts and Injection Schemes for Improving CO 2 Sweep Efficiency in Sandstone and Carbonate Hydrocarbon Formations Final Technical Report Period Covered: October 1, 2010 - December 31, 2014 Report Date: February 5, 2015 DE-FE0005902 Principal Investigator: Quoc P. Nguyen Department of Petroleum & Geosystems Engineering The University of Texas at Austin Co-Investigators: George J. Hirasaki Department of Chemical Engineering Rice University Keith P. Johnston Department of Chemical

  12. TITLE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approval Prior DOE written approval is required for the following actions: 1. Contractor award of any subcontract having a value of 500,000.00 or greater, or any subcontract...

  13. TITLE

    Office of Legacy Management (LM)

    CHAPTER lV 1. PURPOSE. This chapter presents radiological protection requirements and guidelines for cleanup of residual radioactive material and management of the resulting wastes and residues and release of property. These requirements and guidelines are applicable at the time the property is released. Property subject to these criteria indudes, but is not limited to sacs identied by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program

  14. Title

    National Nuclear Security Administration (NNSA)

    ... MAP 12 CONTAMINATED AREAS REPORT DATED 10-10-92 PAGE 13 of 22 GRAVEL GERTIE U.S. ATOMIC ENERGY COMMISSION NEVADA TEST SITE WITH REFERENCE STAKES REYNOLDS ELECT. AND ENGR. CO., INC. ...

  15. Title

    National Nuclear Security Administration (NNSA)

    ... The terminology for the pyroclastic rocks described in this report is that of Ross and Smith (1961) and Poole, Elston, and Carr (1965). I Several general characteristics of the ...

  16. TITLE

    Office of Legacy Management (LM)

    CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada

  17. TITLE

    Office of Legacy Management (LM)

    Post-Remedial Action Report for the Alba Craft Site and Vicinity Properties Oxford , Ohio August 1995 POST-REMEDIAL ACTION REPORT FOR THE A D A CRAFT SITE AND VICINITY PROPERTIES OXFORD, OHIO AUGUST 1995 Prepared f o ~ United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACO5-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  18. TITLE

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAJT SITE Fairfield, Ohio Bechtel National, Inc. POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAFT SITE FAIRFIELD. OHIO JULY 1996 Prepared for United States Depariment o f Energy Oak Ridge Operations Off= Under Contract No. DE-AC05-910R2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . .

  19. TITLE

    Office of Legacy Management (LM)

    J a s 1. Besl President Force Control Industries 3664 Dixla H i 9 h p ~ Falrfleld, Ohio 45014 Dear Hr. Besl: With your consent,. the U.S. Dcpartwnt o f Energy (WE) conducted a r a d i o l q l l c a l survey a t the Former Associate A i r c r a f t Tool and Manufrcturlng Conpany s l t e i n Fairfield, Ohio. OOE has received the-auwey report frm i t s survey. contractor, Oak Rldge national Laboratory (OWL). Two copies o f the report are enclosed f o r your information and use. 71.5 report C 0 n ~

  20. TITLE

    Office of Legacy Management (LM)

    Formerly Utilized Sites Remedial Action Program (FUSRAP) - Contract No. DE-ACOS-9 1 OR21 949 Post-Remedial Action Report for the 8. & T Metals Site Columbus, Ohio October 1996 POST-REMEDIAL ACTION REPORT f OR THE . . B&T METALS SITE COLUMBUS. OHIO OCTOBER 1 W6 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACOS-91 OR2 1949 I Bechtel National, Inc. Oak Ridge, Tcnncssoe I Bcchtel lob No. 14501 CONTENTS Page FIGURES

  1. TITLE

    Office of Legacy Management (LM)

    TO File rn w. 1 1311 300 s ~ b p ~ t B&T Metals Site Scoping Trip Report mh November 22, 1995 hwr J.G. Braun 01 FUSRAP - Geotech ~ l t 4D12 f i t 241-5296 C ~ M S T O Distribution This trip report summarizes the information obtained by b t h the New York and MissourifOhio Teams during visits to the B&T Metals site. The scoping trips were - . - . performed to provide information to aid in the detailed ptanning, design, and preparation for site characterization and remedial action. The

  2. Determining enforceability of air quality requirements for the Title V permit

    SciTech Connect (OSTI)

    Raasch, C.W.; Trinkle, J.A.; Radocha, D.

    1997-12-31

    The focus of this paper is two-fold: (1) Outline the importance, from the perspective of the regulated source, of the identification of state-only enforceable requirements versus federally enforceable requirements in a Title V permit; (2) Describe how to determine the enforceability of requirements as part of a Title V permitting study, including available tools. Contained also in this paper is a case study of enforceability determinations of requirements included in the Title V permit for an integrated pulp and paper mill. The case study is presented to provide an impetus for sources to thoroughly review their draft Title V permits to ensure correct determinations of enforceability.

  3. Title

    Energy Savers [EERE]

    Comments on DOE's Upcoming 2012 Congestion Study Keith White California Public Utilities Commission December 15, 2011 2 General Comments ◊ California has been fully participating in west-wide "economic" transmission studies (TEPPC since 2006, recently with much-appreciated ARRA funding) ◊ The 2005 Energy Policy Act gives DOE unclear scope regarding "congestion," and a requirement to consult with states. The following are essential: * Clearly address the specific rationale

  4. TITLE

    Office of Legacy Management (LM)

    SURVEY OF PHASE I r REMEDIAL ACnONS ALBANYRESFARcEcmTEu AzBANy,OaEGON E A. Powell R B. S l a m JUNE W l This report is based on work performed under contract number DE-AC05-760R00033 with the US. Department o f Enew. This draft report bas not been given full review and patent clearance, and the dissemination o f its information is only f o r official use. No release to the pubIic shall be made without the approval o f tbe Office of Communication Resources, Oak Ridge Assodated U n i v d t k 0 7 8

  5. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3-5 Planting Trees http://education.arm.gov Planting Trees: Grades 3-5 2 Planting Trees Approximate Time 1 to 3 hours, depending upon amount of teacher modeling and depth required in written portion of worksheets. Can be a one-day or several- day investigation. Objective The objective is to estimate the number of trees to be planted per year as a carbon sink to compensate for one year's use of four types of cars. Key Points to Understand Human activities, such as driving a car, using a hot tub,

  6. TITLE

    Office of Legacy Management (LM)

    10 G . Drexel/ M. Poligone F i l e no. 7315/124 s b j e c t Determination of Additional D o t e Contaminated Areas at AAS March 17, 1994 Copies to J. Allison G. Palau K. Thompson A. John At Oak Ridge Ext. 6-5173 The purpose of this memorandum is t o provide results from characterization activities at the Former Associated Aircraft Site (AAS) in Fairfield, Ohio. Additional areas of contamination requiring remediation were identified during these activities. Areas that are currently known to

  7. TITLE

    Office of Legacy Management (LM)

    FUSRAP-031 Page 3 of 5 CATEGORICAL EXCLUSION (CX) FOR REMOVAL ACTION AT THE ASSOCIATE AIRCRAFT SITE ( c o d ) CX TO BE APPLIED: From the DOE NEPA Implementing Procedures, 10 CFR 1021, Subpart D, Appendix 0 , under actions that "Normatly Do Not Require EAs or EISs," "B6.1 Removal actions under CERCLA (induding those taken as final response actions and those taken before remedial action) and removal-type actions similar in scope under RCRA and other authorities (induding those taken

  8. Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Disclaimer: "This report was prepared by Savannah River Nuclear Solutions, LLC (SRNS) for the United States Department of Energy under Contract No. DE-AC09-08SR22470 and is an account of work performed under that contract. Neither the Unites States Government nor any agency thereof, nor any of their employees, not any of their contractors, subcontractors or their employees assume any legal liability or responsibility for any third party's use of the results of such use of any information,

  9. Title:

    Office of Scientific and Technical Information (OSTI)

    A uttwr(s): submined to: NUCLEAR DATA FOR RADIOTHERAPY: PRESENTATION OF A NEW ICRU REPORT AND IAEA INITIATIVES M. B. Chadwick, T-2, MS-B283, Los Alamos National Laboratory, P.O. Box D.T.L. Jones, National Accelerator Centre, Faure, South Africa H . H . Barschall, University of Wisconsin, Madison, WI, USA R.S. Caswell, National Jnstitute of Standards and Technology, P.M. DeLuca Jr., University of Wisconsin, Madison, WI, USA J-P Meulders, Universite Catholique de Louvain, lowain-la-Neuve, Belgium

  10. TITLE

    Office of Legacy Management (LM)

    lnc: POST-REMEDIAL ACTION REPORT FOR THE ALBANY RESEARCH CENTER ALBANY, OREGQN APRIL 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 H . E. Kaye, J. H . Wright, and C . M. Sekula Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job NO. 14501 TABLE OF CONTENTS 1.0 Introduction and Background 2.0 Remedial Action Guidelines 3.0 Remedial Action 3.1 Remedial Action Activities 3.1.1 Outside Areas 3.1.2 Buildings 3.2 Contamination

  11. TITLE

    Office of Legacy Management (LM)

    1 992 Bechtel National, Inc. POST-REMEDIAL ACTION REPORT FOR PHASE I1 WORK CONDUCTED DURING 1990-1991 AT THE ALBANY RESEARCH C E W R ALBANY, OREGON Prepared for United States Department of Energy Oak Ridge Field Office Under Contract No. DE-AC05-9 1OR2 19 4 9 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 Page F i g u r e s . . . . . . . . . . . . . . . . . . . . . . . . . . . i v T a b l e s . . . . . . . . . . . . . . . . . . . . . . . . . . . v i Acronyms . . . . . . . . .

  12. TITLE

    Office of Legacy Management (LM)

    Inc. RADIOLOGICAL CHARACTERIZATION REPORT FOR THE ALBANY RESEARCH CENTER ALBANY, OREGON APRIL 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-BlOR20722 BY J. H . Wright. M. E. Kaye, and C. M. Sekula Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 TABLE OF CONTENTS 1.0 Introduction and Summary I . 1 Introduction 1.2 Purpose and Objectives 1.3 Remedial Action Guidelines 1.4 Summary 2.0 Site Description and History 2.2.2

  13. TITLE

    Office of Legacy Management (LM)

    Verification Survey at B&T Metals, 425 West Town Street, Columbus, Ohio M. E. Murray V. P. Patania C. A. Johnson This report h s ken rcpmduccd directly from the t f s i avail3ble copy. Avaihble to DOE and DOE c o n m u x s from the Olficc of Scienlific and Technical inlormaliar. P.O. Boa 6 1 . W Ridsee. l X 378331: priccsav&lable from (6t5) 576-8101, TTS 6268401. A v ~ i t b I e t o h e public lmm the Naliorul Technical Inlormalion Service. U.S. Dcpvtmenl 01 Commcrcc. 5285 Pon Royal Rd..

  14. TITLE

    Office of Legacy Management (LM)

    M January 28. 1991 EHVIROKHE?ITAL DOCLRIEHTATIOH AND C O M I T Y RELATION REQUIRED FOR THE ALMNY RESEARCH CENTER n , F i l e The purpose o f t h i s memorandm i s t o document the selected approach t o s a t i s f y i n g environmental docmentat ion and comnuni ty re1 a t i o n s n q u l rements f o r t h e Albany Research Center Phase II cleanup e f f o r t . A f t e r review o f t h e NEPA and C E K L A regulations applicable t o t h i s issue, I have concluded t h a t - the NEPA documentation

  15. TITLE

    Office of Legacy Management (LM)

    M A U h G E D 0 1 M M l N Y A R I E I ENERGY SYSTEMS. IYC. FOR THE U.S. O E P A R I M E I I T OF ENEnOY June 14, 1994 POST OFFICE BOX 2006 OAK RIDGE. TENNESSEE 37831 Dr. W. A. Williams EM-421 Trevion II Building Department of Energy Washington, D. C. 20585 Dear Dr. Williams: T r i p Report: Radiological Survey of Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio (FOHOOl), M a y 31 and June 1,1994 On May 31 and June I, a radiological survey was conducted in the area

  16. Inclusion of cool roofs in nonresidential Title 24 prescriptive requirements

    SciTech Connect (OSTI)

    Levinson, Ronnen; Akbari, Hashem; Konopacki, Steve; Bretz, Sarah

    2002-12-15

    Roofs that have high solar reflectance (high ability to reflect sunlight) and high thermal emittance (high ability to radiate heat) tend to stay cool in the sun. The same is true of low-emittance roofs with exceptionally high solar reflectance. Substituting a cool roof for a noncool roof tends to decrease cooling electricity use, cooling power demand, and cooling-equipment capacity requirements, while slightly increasing heating energy consumption. Cool roofs can also lower the ambient air temperature in summer, slowing ozone formation and increasing human comfort. DOE-2.1E building energy simulations indicate that use of a cool roofing material on a prototypical California nonresidential building with a low-sloped roof yields average annual cooling energy savings of approximately 300 kWh/1000 ft2 [3.2 kWh/m2], average annual natural gas deficits of 4.9 therm/1000 ft2 [5.6 MJ/m2], average source energy savings of 2.6 MBTU/1000 ft2 [30 MJ/m2], and average peak power demand savings of 0. 19 kW/1000 ft2 [2.1 W/m2]. The 15-year net present value (NPV) of energy savings averages $450/1000 ft2 [$4.90/m2] with time dependent valuation (TDV), and $370/1000 ft2 [$4.00/m2] without TDV. When cost savings from downsizing cooling equipment are included, the average total savings (15-year NPV + equipment savings) rises to $550/1000 ft2 [$5.90/m2] with TDV, and to $470/1000 ft2 [$5.00/m2] without TDV. Total savings range from 0.18 to 0.77 $/ft2 [1.90 to 8.30 $/m2] with TDV, and from 0.16 to 0.66 $/ft2 [1.70 to 7.10 $/m2] without TDV, across California's 16 climate zones. The typical cost premium for a cool roof is 0.00 to 0.20 $/ft2 [0.00 to 2.20 $/m2]. Cool roofs with premiums up to $0.20/ft2 [$2.20/m2] are expected to be cost effective in climate zones 2 through 16; those with premiums not exceeding $0.18/ft2 [$1.90/m2] are expected to be also cost effective in climate zone 1. Hence, this study recommends that the year-2005 California building energy efficiency code (Title 24, Pa rt 6 of the California Code of Regulations) for nonresidential buildings with low-sloped roofs include a cool-roof prescriptive requirement in all California climate zones. Buildings with roofs that do not meet prescriptive requirements may comply with the code via an ''overall-envelope'' approach (non-metal roofs only), or via a performance approach (all roof types).

  17. Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Requirements Review Reports Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1

  18. DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Silver Spring Networks comments on DOE NBP RFI: Comms Requirements

  19. Title I implementation: Status report on nonattainment areas

    SciTech Connect (OSTI)

    Kenkeremath, L.D.; Snyder, T.C.

    1993-01-01

    Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA's new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency's (EPA's) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO[sub x]) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO[sub x] to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO[sub x] control strategy. The NO[sub x] emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO[sub x] control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

  20. Title I implementation: Status report on nonattainment areas

    SciTech Connect (OSTI)

    Kenkeremath, L.D.; Snyder, T.C.

    1993-01-01

    Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA`s new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency`s (EPA`s) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO{sub x}) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO{sub x} to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO{sub x} control strategy. The NO{sub x} emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO{sub x} control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

  1. Title 40 CFR 30 Uniform Administrative Requirements for Grants...

    Open Energy Info (EERE)

    Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Jump to: navigation, search OpenEI...

  2. Title 40 CFR 1506 Other Requirements of NEPA | Open Energy Information

    Open Energy Info (EERE)

    Other Requirements of NEPA Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR 1506 Other...

  3. Title 40 CFR 123 State Program Requirements | Open Energy Information

    Open Energy Info (EERE)

    State Program RequirementsLegal Published NA Year Signed or Took Effect 2014 Legal Citation 40 CFR 123 DOI Not Provided Check for DOI availability: http:crossref.org Online...

  4. Title | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Title Title

  5. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 1: Title II design report

    SciTech Connect (OSTI)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 1 provides a comprehensive narrative description of the proposed facility and systems, the basis for each of the systems design, and the engineering assessments that were performed to support the technical basis of the Title II design. The intent of the system description presented is to provide WHC an understanding of the facilities and equipment provided and the A/E`s perspective on how these systems will operate.

  6. TITLE III EVALUATION REPORT FOR THE MATERIAL AND PERSONNEL HANDLING SYSTEM

    SciTech Connect (OSTI)

    T. A. Misiak

    1998-05-21

    This Title III Evaluation Report (TER) provides the results of an evaluation that was conducted on the Material and Personnel Handling System. This TER has been written in accordance with the ''Technical Document Preparation Plan for the Mined Geologic Disposal System Title III Evaluation Reports'' (BA0000000-01717-4600-00005 REV 03). The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Material and Personnel Handling System. Recommendations for resolving discrepancies between the as-constructed system, the technical baseline requirements, and the baseline design are included in this report. Cost and Schedule estimates are provided for all recommended modifications.

  7. ARM - Reporting Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    required to report to the DOE ARM Program Director, to the DOE's Office of Biological and Environmental Research, and to the White House Office of Management and Budget. A primary...

  8. Title 42 USC 4332 Cooperation of Agencies, Reports, Availability...

    Open Energy Info (EERE)

    Coordination of Efforts Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 42 USC 4332 Cooperation of Agencies,...

  9. TITLE III EVALUATION REPORT FOR THE SUBSURFACE LIGHTING SYSTEM

    SciTech Connect (OSTI)

    L.J. Fernandez

    1998-09-09

    The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Subsurface Lighting System. Recommendations for resolving discrepancies between the as-constructed system, and the technical baseline requirements are included in this report. Cost and Schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guide lines. These recommendations are intended to improve and enhance the operation and maintenance of the facility.

  10. Federal operating permits program under Title V of the Clean Air Act. Final report

    SciTech Connect (OSTI)

    1996-08-01

    ;Table of Contents: Introduction; Transition Between Parts 70 and 71; Title V Obligations and Applicability; Synthetic Minors, Potential to Emit, and Transition Policy; Permit Application Step and Content; Flexible Permit Approaches; Hazardous Air Pollution Program Requirements for Title V; Information Sources; Appendix A. EPA Memoranda; and Appendix B. Seminar Overhead Transparencies.

  11. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  12. TITLE III EVALUATION REPORT FOR THE SURFACE AND SUBSURFACE POWER SYSTEM

    SciTech Connect (OSTI)

    W.J. REED

    1999-08-16

    The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the alternate constructed power system. Recommendations for resolving discrepancies between the alternate constructed power system, the technical baseline requirements, and the baseline design are included in this report. Cost and schedule estimates are provided for all recommended modifications. This report does not address items which do not meet current safety or code requirements. These items are identified to the CMO and immediate action is taken to correct the situation. The report does identify safety and code items for which the A/E is recommending improvements. The recommended improvements will exceed the minimum requirements of applicable code and safety guidelines. These recommendations are intended to improve and enhance the operation and maintenance of the facility. This Title III Evaluation Report (TER) does not include evaluation of surface electrical construction support facilities used to provide temporary construction power where the intent to remove such facilities when construction is completed such as tent storage buildings, shop buildings, fuel storage area etc. Furthermore, this TER does not include the extension of the existing overhead power lines to the booster pump station that was designed, installed, and is maintained by Nevada Test Site (NTS).

  13. Final Scientific/Technical Report Grant title: Use of ARM Measurements...

    Office of Scientific and Technical Information (OSTI)

    Final ScientificTechnical Report Grant title: Use of ARM Measurements of Spectral Zenith Radiance for Better Understanding of 3D Cloud-Radiation Processes and Aerosol-Cloud ...

  14. U.S. Department of Energy 2014 UMTRCA Title I Annual Report

    Office of Legacy Management (LM)

    ...AL62350-60F, Rev. 1, U.S. Department of Energy DOE, September 1994) and in procedures ... Title I Annual Report U.S. Department of Energy Shiprock, New Mexico March 2015 Page 16-2 ...

  15. U.S. Department of Energy 2013 UMTRCA Title I Annual Report

    Office of Legacy Management (LM)

    ...AL62350-60F, Rev. 1, U.S. Department of Energy DOE, September 1994) and in procedures ... Title I Annual Report U.S. Department of Energy Shiprock, New Mexico March 2014 Page 16-2 ...

  16. Title Preactivity Survey Report for Five Tonopah Test Range Explosive...

    National Nuclear Security Administration (NNSA)

    Preactivity Survey Report for Five Tonopah Test Range Explosive Ordnance Disposal Sites ... PREACTIVITY AND RECLAMATION SURVEY REPORTS FOR FIVE TONOPAH TEST RANGE EXPLOSIVE ORDNANCE ...

  17. Updated Reporting Requirement Checklists and Research Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy ...

  18. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    SciTech Connect (OSTI)

    2014-03-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

  19. U.S. Department of Energy 2013 UMTRCA Title I Annual Report

    Office of Legacy Management (LM)

    UMTRCA Title I Annual Report March 2014 Gunnison, Colorado Page 8-1 8.0 Gunnison, Colorado, Disposal Site 8.1 Compliance Summary The Gunnison, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on June 3, 2013. The disposal cell and all associated surface water diversion and drainage structures were in excellent condition and functioning as designed. Six riprap test areas on the cell apron and diversion ditches were visually inspected; no rock

  20. Title: Clean Cities Alternative Fuel Price Report, April, 2014

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    4 Clean Cities Alternative Fuel Price Report April 2014 Page 2 WELCOME! Welcome to the April 2014 issue of the Clean Cities Alternative Fuel Price Report, a quarterly report designed to keep Clean Cities coalitions and other interested parties up to date on the prices of alternative and conventional fuels in the United States. This issue summarizes prices that were collected between April 1, 2014 and April 15, 2014 from Clean Cities coordinators, fuel providers, and other Clean Cities

  1. Title: Clean Cities Alternative Fuel Price Report, July, 2014

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    4 Clean Cities Alternative Fuel Price Report July 2014 Page 2 WELCOME! Welcome to the July 2014 issue of the Clean Cities Alternative Fuel Price Report, a quarterly report designed to keep Clean Cities coalitions and other interested parties up to date on the prices of alternative and conventional fuels in the United States. This issue summarizes prices that were collected between July 1, 2014 and July 15, 2014 from Clean Cities coordinators, fuel providers, and other Clean Cities stakeholders.

  2. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    SciTech Connect (OSTI)

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  3. Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling

    Energy Savers [EERE]

    Analysis of Downwash from Mirant's Potomac River Power Plant" | Department of Energy Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant" Docket No. EO-05-01. Sullivan Environmental Consulting, Inc. has prepared a review of the "Update 1 to: A Dispersion

  4. Report Title

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The inorganic materials in the coal would melt to form slag. The raw syngas and the slag would leave the gasifier (reactor) and flow into separate quench sections, where they would ...

  5. Report Title

    Energy Savers [EERE]

    ... There also is a National-level need for urea-based ... water-gas shift unit; low-temperature gas cooling ... from the Gulf Coast Waste Disposal Authority 1-4 TCEP ...

  6. Report Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... water-gas shift unit; low-temperature gas cooling ... In the EIS, DOE considers impacts to the natural and human ... from the Gulf Coast Waste Disposal Authority 1-4 ...

  7. Report Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Supplement Analysis for the Texas Clean Energy Project Final Environmental Impact Statement DOE/EIS-0444-SA-01 May 2015 TCEP Supplement Analysis Contents CONTENTS 1 INTRODUCTION .............................................................................................................................................. 1-1 1.1 Background .............................................................................................................................................. 1-1 1.2

  8. Occupational Radiation Protection Record-Keeping and Reporting Guide for use with Title 10, Code of Federal Regulations, Part 835, Occupational Radiation Protection

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-05-20

    This Guide provides an acceptable methodology for establishing and operating an occupational radiation protection record-keeping and reporting program that will comply with U.S. Department of Energy (DOE) requirements specified in Title 10 of the Code of Federal Regulations (CFR), Part 835, Occupational Radiation Protection. Canceled by DOE G 441.1-1B.

  9. FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology

    Office of Scientific and Technical Information (OSTI)

    FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology of Greater Prairie-Chickens DOE Award Number: DE-EE0000526 Project Period: 12/01/2009 to 6/22/2012 Principal Investigator: Brett K. Sandercock, Professor of Wildlife Biology, Division of Biology, 116 Ackert Hall, Kansas State University, Manhattan, Kansas 66506, bsanderc@k- state.edu, 785-532-0120 Recipient Organization: Kansas State University (92-977-3554) Administrative Contact of

  10. Should Title 24 Ventilation Requirements Be Amended to include an Indoor Air Quality Procedure?

    SciTech Connect (OSTI)

    Dutton, Spencer M.; Mendell, Mark J.; Chan, Wanyu R.

    2013-05-13

    Minimum outdoor air ventilation rates (VRs) for buildings are specified in standards, including California?s Title 24 standards. The ASHRAE ventilation standard includes two options for mechanically-ventilated buildings ? a prescriptive ventilation rate procedure (VRP) that specifies minimum VRs that vary among occupancy classes, and a performance-based indoor air quality procedure (IAQP) that may result in lower VRs than the VRP, with associated energy savings, if IAQ meeting specified criteria can be demonstrated. The California Energy Commission has been considering the addition of an IAQP to the Title 24 standards. This paper, based on a review of prior data and new analyses of the IAQP, evaluates four future options for Title 24: no IAQP; adding an alternate VRP, adding an equivalent indoor air quality procedure (EIAQP), and adding an improved ASHRAE-like IAQP. Criteria were established for selecting among options, and feedback was obtained in a workshop of stakeholders. Based on this review, the addition of an alternate VRP is recommended. This procedure would allow lower minimum VRs if a specified set of actions were taken to maintain acceptable IAQ. An alternate VRP could also be a valuable supplement to ASHRAE?s ventilation standard.

  11. Guide Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE G XXX.X-X xx-xx-20XX Guide Title [This Guide describes acceptable, but not mandatory means for complying with requirements. Guides are not requirements documents and are not to be construed as requirements in any audit or appraisal for compliance with associated rule or directives.] U.S. Department of Energy Office of Primary Interest FOREWORD (optional) THE FOREWORD SHOULD DESCRIBE THE DOE REQUIREMENTS, DIRECTIVES, OR RULES THAT MAY BE SATISFIED BY IMPLEMENTING THIS GUIDE. CONTENTS

  12. Continuing Appropriations Resolution, 2013-- Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report

    Broader source: Energy.gov [DOE]

    Section 101(a)(4) of the Continuing Appropriations Resolution, 2013, Pub. L No. 112-175, makes appropriations available through March 27, 2013 for continuing projects or activities that were conducted under Consolidated Appropriations Act, 2012, Pub. L. No.112-74, under the same authority and conditions. Section 104 provides that no appropriation under the continuing resolution shall be used to initiate or resume any project or activity for which appropriations, funds, or other authority were not available during fiscal year 2012. Therefore, the Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 providing implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report remains in effect until rescinded or superseded.

  13. Final Progress Report Project Title: Northeast Provider of Solar Instructor Training - North

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Progress Report Project Title: Northeast Provider of Solar Instructor Training - North Covering Period: July 1, 2012 - June 30, 2015 Date of Report: June 30, 2015 Recipient: Maine Community College System, dba Kennebec Valley Community College Award Number: DE-EE0005673 Working Partners: N/A Cost-Sharing Partners: N/A Contacts: Amy Hudnor Douglas Mitchell Phone: 207-453-5813 Phone: 207-453-5123 Fax: 207-453-5010 Fax: 207-453-5010 Email: ahudnor@kvcc.me.edu DOE Project Team: DOE Field

  14. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

    SciTech Connect (OSTI)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters.

  15. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate

    SciTech Connect (OSTI)

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.

  16. Title 18 CFR 4.38 Consultation Requirements | Open Energy Information

    Open Energy Info (EERE)

    Consultation RequirementsLegal Published NA Year Signed or Took Effect 2015 Legal Citation 18 CFR 4.38 DOI Not Provided Check for DOI availability: http:crossref.org Online...

  17. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    UMTRCA Title I Annual Report March 2016 Grand Junction, Colorado Page 6-1 6.0 Grand Junction, Colorado, Disposal Site 6.1 Compliance Summary The Grand Junction, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on December 8, 2015. A portion of the disposal cell remains open to receive low-level radioactive materials from various sources; the open cell and its supporting structures and facilities are not included in the annual inspection. Ongoing

  18. 1997 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Heather McBride

    1997-07-01

    The Emergency Planning and Community Right-to-Know Act of 1986 (EPCIL4), Title III, Section 313 [also known as the Superfund Amendment and Reauthorization Act (SARA)], as modified by Executive Order 12856, requires all federal facilities to submit an annual Toxic Chemical Release Inventory report every July for the preceding calendar year. Owners and operators of manufacturing, processing, or production facilities are required to report their toxic chemical releases to all environmental mediums (air, water, soil, etc.). At Los Alamos National Laboratory (LANL), nitric acid was the only toxic chemical used in 1997 that met the reportable threshold limit of 10,000 lb. Form R is the only documentation required by the Environmental Protection Agency, and it is included in the appendix of this report. This report, as requested by DOE, is provided for documentation purposes. In addition, a detailed description of the evaluation and reporting process for chemicals and processes at LANL has been included.

  19. NERSC HPC Program Requirements Review Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Published Reports NERSC HPC Program Requirements Review Reports These publications comprise the final reports from the HPC requirements reviews presented to the Department of Energy. Downloads ASCR2017Final.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research - Target 2017 NerscBES2017ReqRevFinal.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for Basic Energy Sciences - Target 2017

  20. Authorization basis requirements comparison report

    SciTech Connect (OSTI)

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  1. --No Title--

    Broader source: Energy.gov (indexed) [DOE]

    some the revisions for both chapters includes DOE's annual reporting performance targets, MAX site quarterly reporting by the DOE Agency Coordinator, the requirement for 100%...

  2. 1998 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III

    SciTech Connect (OSTI)

    Marjorie B. Stockton

    1999-11-01

    The Emergency Planning and Community Right-to-Know Act (EPCRA) of 1986 [also known as the Superfund Amendment and Reauthorization Act (SARA), Title III], as modified by Executive Order 12856, requires that all federal facilities evaluate the need to submit an annual Toxic Chemical Release Inventory report as prescribed in Title III, Section 313 of this Act. This annual report is due every July for the preceding calendar year. Owners and operators who manufacture, process, or otherwise use certain toxic chemicals above listed threshold quantities are required to report their toxic chemical releases to all environmental mediums (air, water, soil, etc.). At Los Alamos National Laboratory (LANL), no EPCRA Section 313 chemicals were used in 1998 above the reportable threshold limits of 10,000 lb or 25,000 lb. Therefore LANL was not required to submit any Toxic Chemical Release Inventory reports (Form Rs) for 1998. This document was prepared to provide a detailed description of the evaluation on chemical usage and EPCRA Section 313 threshold determinations for LANL for 1998.

  3. AL 2014-05FAL  2014-02 Congressional Notifications and Quarterly Reporting Approp. Act, 2014, Div D, Title III, Sec 301

    Broader source: Energy.gov [DOE]

    AL 2014-05/FAL 2014-02 (AL/FAL) implements statutory requirements for Congressional notifications or quarterly reporting to the Appropriations Committees for contract, financial assistance, or other transaction agreement actions in accordance with Energy and Water Development and Related Agencies Appropriations Act, 2014, Division D, Title III, Section 3011 to include related notices for prior fiscal years' Appropriations Acts. A summary of the 2 statutory pre-award/pre-selection notices and the 1 post award quarterly report follows. See the AL/FAL for details to include a decision chart to assist in determining which notice template to use.

  4. my title

    Office of Scientific and Technical Information (OSTI)

    Negative to positive magnetoresistance and magnetocaloric effect in Pr0.6Er0.4Al2 Arjun K. Pathak, 1, [1] K. A. Gschneidner, Jr., 1, 2 and V. K. Pecharsky1, 2 1The Ames Laboratory, U.S. Department of Energy, Iowa State University, Ames, Iowa 50011-3020, USA 2Department of Materials Science and Engineering, Iowa State University, Ames, Iowa 50011-2300, USA ABSTRACT We report on the magnetic, magnetocaloric and magnetotransport properties of Pr0.6Er0.4Al2. The title compound exhibits a large

  5. Individual Reporting Requirements | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Individual Reporting Requirements DOE Order 472.2, Personnel Security, sets forth reporting requirements for all DOE employees, contractors, and others involved in applying for or holding a DOE access authorization. Reporting must be done verbally within two business days of the event followed by a written confirmation within three additional business days to the Office of Personnel and Facility Clearances and Classification (OPFCC), to include: Legal action effected for a

  6. Title XVII

    Broader source: Energy.gov [DOE]

    Title XVII of EPAct05 provides the basis of the Energy Department’s program. This title provides broad authority for the Department to guarantee loans that support early commercial use of advanced...

  7. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    the system in support of Federal Personnel. 2. General Requirements 2.1 Capacity- The Web-Based Reporting System shall have the capacity to contain all documents, including task ...

  8. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Slick Rock, Colorado Page 17-1 17.0 Slick Rock, Colorado, Disposal Site 17.1 Compliance Summary The Slick Rock, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on May 12, 2015. The site was in good condition. Inspectors identified contact information that needed updating on the entrance sign; no other maintenance needs or cause for a follow-up inspection was required. 17.2 Compliance Requirements Requirements for the long-term surveillance and

  9. Microsoft Word - Attachment B - Reporting Requirements.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-SOL-0003339 J.1 ATTACHMENT B - REPORTING REQUIREMENTS REPORTING REQUIREMENTS CHECKLIST 1. AWARDEE: 2. IDENTIFICATION NUMBER: REPORT SUBMISSION: Reports shall be submitted to the...

  10. Smart gun technology requirements preliminary report

    SciTech Connect (OSTI)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  11. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Report March 2016 Canonsburg, Pennsylvania Page 3-1 3.0 Canonsburg, Pennsylvania, Disposal Site 3.1 Compliance Summary The Canonsburg, Pennsylvania, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on October 27, 2015. The site was in excellent condition. No evidence of erosion or slope instability was observed on the disposal cell. A trespass campsite was discovered hidden among the trees in the southwest corner of the property, outside the perimeter

  12. Compliance with the Clean Air Act Title VI Stratospheric Ozone Protection Program requirements at U.S. DOE Oak Ridge Reservation Facilities

    SciTech Connect (OSTI)

    Humphreys, M.P.; Atkins, E.M.

    1999-07-01

    The Title VI Stratospheric Ozone Protection Program of the Clean Air Act (CAA) requires promulgation of regulations to reduce and prevent damage to the earth's protective ozone layer. Regulations pursuant to Title VI of the CAA are promulgated in the Code of Federal Regulations (CFR) at Title 40 CFR, Part 822. The regulations include ambitious production phaseout schedules for ozone depleting substances (ODS) including chlorofluorocarbons (CFCs), hydrochlorofluorocarbons (HCFCs), halons, carbon tetrachloride, and methyl chloroform under 40 CFR 82, Subpart A. The regulations also include requirements for recycling and emissions reduction during the servicing of refrigeration equipment and technician certification requirements under Subpart F; provisions for servicing of motor vehicle air conditioners under Subpart B; a ban on nonessential products containing Class 1 ODS under Subpart C; restrictions on Federal procurement of ODS under Subpart D; labeling of products using ODS under Subpart E; and the Significant New Alternatives Policy Program under Subpart G. This paper will provide details of initiatives undertaken at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title VI Stratospheric Ozone Protection Program. The Stratospheric Ozone Protection Plans include internal DOE requirements for: (1) maintenance of ODS inventories; (2) ODS procurement practices; (3) servicing of refrigeration and air conditioning equipment; (4) required equipment modifications or replacement; (5) technician certification training; (6) labeling of products containing ODS; (7) substitution of chlorinated solvents; and (8) replacement of halon fire protection systems. The plans also require establishment of administrative control systems which assure that compliance is achieved and maintained as the regulations continue to develop and become effective.

  13. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Green River, Utah Page 7-1 7.0 Green River, Utah, Disposal Site 7.1 Compliance Summary The Green River, Utah, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on March 18, 2015. The disposal cell was in excellent condition. One missing perimeter sign was replaced during the inspection. Inspectors identified no other maintenance needs or cause for a follow-up or contingency inspection. 7.2 Compliance Requirements Requirements for the long-term surveillance

  14. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2012 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  15. U.S. Department of Energy 2014 UMTRCA Title I Annual Report

    Office of Legacy Management (LM)

    Gunnison, Colorado Page 8-1 8.0 Gunnison, Colorado, Disposal Site 8.1 Compliance Summary The Gunnison, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on June 11, 2014. The disposal cell and all associated surface water diversion and drainage structures were in excellent condition and functioning as designed. Six riprap test areas on the cell apron and diversion ditches were visually inspected; no rock degradation was noted when compared to 2012

  16. The preparation for and survival of an EPA Title IV and Title V facility audit

    SciTech Connect (OSTI)

    Facca, G.L.; Faler, M.

    1999-07-01

    As part of the 1990 Clean Air Act Amendments, major facilities are required to obtain federally enforceable operating permits (Title V). In a separate permitting action, the electric utilities with units generating more then 25 megawatts are required to obtain permits for NO{sub x} and SO{sub x}, the emissions which contribute to acid rain (Title IV). The Title IV permit is included as part of the Title V permit. This paper will use an actual audit experience at a coal fired generation facility as a case study for the preparation for and outcome of an EPA Title IV Level 3 audit. The paper will document the procedures for preparation, the audit process, and the outcome. The audit is part of the EPA's process for review of the record keeping and instrument calibration methods outlined in Title IV. Both types of permits have many different record keeping and monitoring requirements as well as separate reporting requirements which are submitted to both federal; state and local regulatory agencies for review and evaluation. Title IV units include very specific instrument calibration/audit requirements, and Title V has compliance testing and monitoring requirements. Alliant Power was notified in August 1998 of the intent of EPA Region VII to conduct a Level 3 audit at the Lansing Generation Station. The US EPA and the State of Iowa intended to review all Title IV record keeping (Level 1), continuous emission monitoring calibrations and linearity testing (Level 2) and observe the annual Relative Accuracy Testing Audit performed by an outside contractor. In addition, during this facility site visit, the compliance with Title V permit requirements was also audited.

  17. A review of Title V operating permit application requirements caused by the use of waste-derived fuel at cement plants

    SciTech Connect (OSTI)

    Yarmac, R.F.

    1994-12-31

    The Clean Air Act Amendments of 1990 required the USEPA to establish a comprehensive operating permit program which is being administered by the states. Most major air pollution sources will be required to submit operating permit applications by November 15, 1995 or earlier. Portland cement plants that burn waste-derived fuel face some special permitting problems that need to be addressed during the permit application process. This paper presents a brief summary of the Title V application with special emphasis on the permitting requirements incurred by the utilization of waste fuel at cement plants.

  18. Policy Flash 2013-49 Updating Reporting Requirement Checklist...

    Energy Savers [EERE]

    Policy Flash 2013-49 Updating Reporting Requirement Checklist including the research performance progress report Policy Flash 2013-49 Updating Reporting Requirement Checklist...

  19. TITLE XVII APPLICATION PROCESS

    Broader source: Energy.gov [DOE]

    The Title XVII application process is a two-part process.  Eligible applicants receive an invitation to submit Part II of their application after meeting basic eligibility requirements referred to...

  20. FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Savers [EERE]

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement PDF icon FY 2013 DARM Transmittal Letter and Attachment Final.pdf More Documents & Publications FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY_09_DM_RM_AM_Reporting_Memo_and_attachment_072009.pdf Real Property Maintenance Reporting Requirement

  1. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    reciprocity of tax-exempt status to other states. The only provision which will establish tax-exempt status under California ruling is that title of property purchased for use in...

  2. --No Title--

    Broader source: Energy.gov (indexed) [DOE]

    Guard Corps, as contained in Titles II and III of the Iran Threat Reduction and Syria Human Rights Act of 2012. The effective date was December 10, 2012. This Flash will be...

  3. UC 9-8-307 - Antiquities Discovery Reporting Requirements | Open...

    Open Energy Info (EERE)

    UC 9-8-307 - Antiquities Discovery Reporting RequirementsLegal Abstract Sets forth reporting requirements for discovery of archaeological resources on nonfederal lands....

  4. FY 2014 Federal Real Property Reporting Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Real Property Reporting Requirement FY 2014 Federal Real Property Reporting Requirement PDF icon FIMS FRPP FY 2014 Reporting Instructions Signed Sep 18 2014 .pdf More Documents & Publications Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY09_Federal_Real_Property_Reporting_Requirements.pdf FY 2012 Federal Real Property Reporting Requirement

  5. Experience in automating the Title V permit application

    SciTech Connect (OSTI)

    Ashcraft, T.; O`Brien, J.

    1995-12-31

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  6. Title V Semi-Annual Emissions Report for Permit P100R1 July 1, 2011 - December 31, 2011

    SciTech Connect (OSTI)

    Whetham, Walter

    2012-03-15

    Reports of actual emissions from permitted sources in Section 2.0 shall be submitted on a 6 month basis. Reports shall not include emissions from insignificant activities. Emission estimates of criteria pollutants NOx, CO, SO2, PM and VOCs shall not include fugitive emissions. Emission estimates of HAPs shall include fugitive emissions. The reports shall include a comparison of actual emissions that occurred during the reporting period with the facility-wide allowable emission limits specified in Section 2.11 of this permit. The report required by Condition 4.1 shall be submitted within 90 days from the end of the reporting period. The semiannual report required by Condition 4.2 shall be submitted within 45 days from the end of the reporting period. The reporting periods are January 1st to June 30th and July 1st to December 31st. This condition is pursuant to 20.2.70.302.E.1 NMAC.

  7. Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report models only Unit 1 operating under two daytime only scenarios to reduce exposures and meet the National Ambient Air Quality Standards for PM10, SO2, and NOx that were ...

  8. FY 2012 Federal Real Property Reporting Requirement | Department of Energy

    Energy Savers [EERE]

    Federal Real Property Reporting Requirement FY 2012 Federal Real Property Reporting Requirement PDF icon FRPC Reporting Instructions 2012 final.pdf More Documents & Publications 2013 guidance fo real Property Inventory Reporting FY09_Federal_Real_Property_Reporting_Requirements.pdf Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations

  9. Federal Agency Facility Reporting Requirements and Performance Data |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reporting & Data » Federal Agency Facility Reporting Requirements and Performance Data Federal Agency Facility Reporting Requirements and Performance Data The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts for federal facilities. FEMP also collects and publishes agency performance data. Reporting Requirements Agencies are required to report progress

  10. TITLE XVII APPLICATION PORTAL

    Broader source: Energy.gov [DOE]

    The Title XVII online application portal guides users through the Title XVII loan guarantee application process.

  11. Updated Reporting Requirement Checklists and Research Performance Progress

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report (RPPR) | Department of Energy Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy Flash 2011-46, transmitted updated copies of the Reporting Requirements Checklist to add coverage for For-Profit audits. This Flash transmits additional updates to the checklists to clarify the submission instructions for the For-Profit audit reports and to make some additional

  12. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and ...

  13. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and ...

  14. Microsoft Word - Attachment B - Reporting Requirements.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-SOL-0003339 J.1 ATTACHMENT B - REPORTING REQUIREMENTS REPORTING REQUIREMENTS CHECKLIST 1. AWARDEE: 2. IDENTIFICATION NUMBER: REPORT SUBMISSION: Reports shall be submitted to the electronic addresses indicated in the NETL-identified distribution list provided in the post award debriefing. Electronic copies of each report must be submitted to the Contract Specialist (CS) and Contracting Officer's Representative (COR). 4. PLANNING AND REPORTING REQUIREMENTS FORM NO. FREQ. NO. OF COPIES FORM NO.

  15. Needs and Requirements for Future Research Reactors (ORNL Perspectives...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Needs and Requirements for Future Research Reactors (ORNL Perspectives) Citation Details In-Document Search Title: Needs and Requirements for Future Research ...

  16. Annual Progress Report Fish Research Project Oregon : Project title, Evaluation of Habitat Improvements -- John Day River.

    SciTech Connect (OSTI)

    Olsen, Erik A.

    1984-01-01

    This report summarizes data collected in 1983 to evaluate habitat improvements in Deer, Camp, and Clear creeks, tributaries of the John Day River. The studies are designed to evaluate changes in abundance of spring chinook and summer steelhead due to habitat improvement projects and to contrast fishery benefits with costs of construction and maintenance of each project. Structure types being evaluated are: (1) log weirs, rock weirs, log deflectors, and in stream boulders in Deer Creek; (2) log weirs in Camp Creek; and (3) log weir-boulder combinations and introduced spawning gravel in Clear Creek. Abundance of juvenile steelhead ranged from 16% to 119% higher in the improved (treatment) area than in the unimproved (control) area of Deer Creek. However, abundance of steelhead in Camp Creek was not significantly different between treatment and control areas. Chinook and steelhead abundance in Clear Creek was 50% and 25% lower, respectively in 1983, than the mean abundance estimated in three previous years. The age structure of steelhead was similar between treatment and control areas in Deer and Clear creeks. The treatment area in Camp Creek, however, had a higher percentage of age 2 and older steelhead than the control. Steelhead redd counts in Camp Creek were 36% lower in 1983 than the previous five year average. Steelhead redd counts in Deer Creek were not made in 1983 because of high streamflows. Chinook redds counted in Clear Creek were 64% lower than the five year average. Surface area, volume, cover, and spawning gravel were the same or higher than the corresponding control in each stream except in Deer Creek where there was less available cover and spawning gravel in sections with rock weirs and in those with log deflectors, respectively. Pool:riffle ratios ranged from 57:43 in sections in upper Clear Creek with log weirs to 9:91 in sections in Deer Creek with rock weirs. Smolt production following habitat improvements is estimated for each stream. Preliminary cost estimates are summarized for each habitat project and economic benefits are calculated for Deer Creek.

  17. Title Standards 2001

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice

  18. Federal Comprehensive Annual Energy Reporting Requirements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Reporting Requirements Federal Comprehensive Annual Energy Reporting Requirements The Federal Energy Management Program (FEMP) provides federal agencies with resources for reporting annual progress made toward efficiency mandates. Section 548(a) of National Energy Conservation Policy Act (NEPCA) (42 U.S.C. 8258(a)) requires federal agencies to submit to the U.S. Department of Energy an annual report that describes activities to meet the energy management requirements of Section 543 of

  19. Enter Report Title Here

    Energy Savers [EERE]

    ... The smaller pool of vendors will be more likely to have the ... and reactance); * Fuel specifications; * Reserve ... power flow and resource scheduling to simulate the security ...

  20. Implementation of Title V in California

    SciTech Connect (OSTI)

    Werner, B.; Cook, B.

    1996-12-31

    This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

  1. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  2. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  3. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  4. --No Title--

    U.S. Energy Information Administration (EIA) Indexed Site

    1978; Form ERA-51, "Transfer Pricing Report," January 1979 through September 1982; Form EP-51, "Monthly Foreign Crude Oil Transaction Report," October 1982 through June 1984; Form...

  5. HEP Science Network Requirements--Final Report

    SciTech Connect (OSTI)

    Bakken, Jon; Barczyk, Artur; Blatecky, Alan; Boehnlein, Amber; Carlson, Rich; Chekanov, Sergei; Cotter, Steve; Cottrell, Les; Crawford, Glen; Crawford, Matt; Dart, Eli; Dattoria, Vince; Ernst, Michael; Fisk, Ian; Gardner, Rob; Johnston, Bill; Kent, Steve; Lammel, Stephan; Loken, Stewart; Metzger, Joe; Mount, Richard; Ndousse-Fetter, Thomas; Newman, Harvey; Schopf, Jennifer; Sekine, Yukiko; Stone, Alan; Tierney, Brian; Tull, Craig; Zurawski, Jason

    2010-04-27

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity is more complex than network engineering for intra-US connectivity. This is because transoceanic circuits have lower reliability and longer repair times when compared with land-based circuits. Therefore, trans-Atlantic connectivity requires greater deployed bandwidth and diversity to ensure reliability and service continuity of the user-level required data transfer rates. (4) Trans-Atlantic traffic load and patterns must be monitored, and projections adjusted if necessary. There is currently a shutdown planned for the LHC in 2012 that may affect projections of trans-Atlantic bandwidth requirements. (5) There is a significant need for network tuning and troubleshooting during the establishment of new LHC Tier-2 and Tier-3 facilities. ESnet will work with the HEP community to help new sites effectively use the network. (6) SLAC is building the CCD camera for the LSST. This project will require significant bandwidth (up to 30Gbps) to NCSA over the next few years. (7) The accelerator modeling program at SLAC could require the movement of 1PB simulation data sets from the Leadership Computing Facilities at Argonne and Oak Ridge to SLAC. The data sets would need to be moved overnight, and moving 1PB in eight hours requires more than 300Gbps of throughput. This requirement is dependent on the deployment of analysis capabilities at SLAC, and is about five years away. (8) It is difficult to achieve high data transfer throughput to sites in China. Projects that need to transfer data in or out of China are encouraged to deploy test and measurement infrastructure (e.g. perfSONAR) and allow time for performance tuning.

  6. Implementation of the Clean Air Act, Title III, Section 112(r) Prevention of Accidental Release Rule requirements at U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.; Fellers, H.L. [Lockheed-Martin Energy Systems K-25 Site, Oak Ridge, TN (United States)

    1997-12-31

    Title III, Section 112(r) of the Clean Air Act (CAA) Amendments of 1990 requires the Environmental Protection Agency (EPA) to promulgate regulations to prevent accidental releases of regulated substances and to reduce the severity of those releases that do occur. The final EPA rule for Risk Management Programs under Section 112(r)(7) of the CAA, promulgated June 20, 1996, applies to all stationary sources with processes that contain more than a threshold quantity of any of 139 regulated substances listed under 40 CFR 68.130. All affected sources will be required to prepare a risk management plan which must be submitted to EPA and be made available to state and local governments and to the public. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of the Prevention of Accidental Release Rule. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the K-25 Site. The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the K-25 Site conducts a variety of research and development activities and is the home of a mixed waste incinerator. ORR activities underway and soon to be undertaken toward implementation of the Prevention of Accidental Release Rule include: compilation of inventories of regulated substances at all processes at each of the three ORR Facilities for determination of affected processes and facilities; plans for inventory reduction to levels below threshold quantities, where necessary and feasible; determination of the overlap of processes subject to the OSHA PSM Standard and determination of parallel requirements; preparation of Risk Management Plans and Programs for affected processes and facilities including detailed requirements for hazard assessment, prevention, and emergency response.

  7. Review Policy / Proposal Guidelines / Reporting Requirements| U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) Review Policy / Proposal Guidelines / Reporting Requirements High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management Acknowledgements of Federal

  8. --No Title--

    U.S. Energy Information Administration (EIA) Indexed Site

    Form FEA-F701-M-0, "Transfer Pricing Report," January 1978 through December 1978; Form ERA-51, "Transfer Pricing Report," January 1979 through September 1982; Form EP-51,...

  9. --No Title--

    Office of Legacy Management (LM)

    on Economic Development at MATC: * Comprehensive Reuse Plan (future document) * Marketing Plan (future document) * Brochures (future documents) * Annual Reports (future...

  10. Presentation Title

    Energy Savers [EERE]

    Prescriptive Path compliance form Prescriptive Path compliance form This Prescriptive Path compliance form shall be submitted to: doechallengehome@newportpartnersllc.com File challenge_home_prescriptive_compliance_5-12.docx More Documents & Publications Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) DOE Zero Energy Ready Home National Program Requirements (Rev. 04) Washington DOE ZERH Program Requirements

    4/20/2015 2:07 PM Budget Atomization

  11. --No Title--

    Broader source: Energy.gov (indexed) [DOE]

    Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Business Case Analysis Requirements for Certain Interagency and...

  12. --No Title--

    Energy Savers [EERE]

    All contractors responding to the notice are afforded a fair opportunity to make an offer and have that offer fairly considered. Contract award synopsis require publication...

  13. Document Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... AND REGULATORY REQUIREMENTS ... greenhouse gas and other emissions, minimizing impacts to natural and cultural ... nonconforming land-uses as described in ...

  14. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Related Links and Forms Financial Assistance Forms Funding Opportunity Application Forms ... Post Award Forms These forms are required after a financial assistance award for ...

  15. --No Title--

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    and diesel fuel sold. There are four interrelated requirements, for cellulosic biofuels, biomass-based diesel, advanced biofuels, and total renewable fuels. Compliance with...

  16. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy EISA Federal Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA 432) requires federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each federal agency must designate an energy manager to be responsible for

  17. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015...

    Broader source: Energy.gov (indexed) [DOE]

    Companies with authorizations to export LNG are required to file, on a semi-annual basis, written reports describing the progress of the planned liquefaction facility project that...

  18. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    noticeoog.jsp. * Electronic Filing Option: The PC Electronic Data Reporting Option (PEDRO) is a Windows-based application that will enable you to enter data interactively,...

  19. --No Title--

    U.S. Energy Information Administration (EIA) Indexed Site

    Notes section for additional detail. Sources: Energy Information Administration, Form FEA-F701-M-0, "Transfer Pricing Report," January 1978 through December 1978; Form ERA-51,...

  20. --No Title--

    Broader source: Energy.gov (indexed) [DOE]

    to the acquisition community. They should be considered another tool for your tool chest. Please report any apparent errors or inconsistencies. Our intent is to update them as...

  1. --No Title--

    U.S. Energy Information Administration (EIA) Indexed Site

    No data reported. W Withheld to avoid disclosure of individual company data. 1 Includes Bahrain, Iran, Iraq, Kuwait, Neutral Zone, Qatar, Saudi Arabia, and United Arab Emirates....

  2. Letter to SEP Recipients on Changes to Reporting Requirements | Department

    Energy Savers [EERE]

    of Energy Letter to SEP Recipients on Changes to Reporting Requirements Letter to SEP Recipients on Changes to Reporting Requirements PDF icon sep_ reporting_pre-guidance_announcement_06022011.pdf More Documents & Publications Reporting Pre-guidance Announcement 06-02-2011 Microsoft Word - T4_VEIC_TO2_ Sub3_Residential Retrofit Program Design Guide Play Book_TEAM 4 FINAL.docx Three Arrested and Charged in a Scheme to Defraud Federal Research Funding

  3. --No Title--

    U.S. Energy Information Administration (EIA) Indexed Site

    through 1980 reflect the month of reporting; values since then reflect the month of acquisition, which can be the month of loading, the month of landing, or sometime between those...

  4. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    paper Ref. 1 below and attached pdf reporting OPV cell results obtained by Prof. Yang Yang's (UCLA) research group. A remarkable power-conversion efficiency of 4.4% was...

  5. NIF Functional Requirements and Primary Criteria Rev. 1.8 September...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: NIF Functional Requirements and Primary Criteria Rev. 1.8 September 2006 Citation Details In-Document Search Title: NIF Functional Requirements and Primary ...

  6. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    Office of Legacy Management (LM)

    Sherwood, Washington Page 5-1 5.0 Sherwood, Washington, Disposal Site 5.1 Compliance Summary The Sherwood, Washington, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II Disposal Site was inspected on May 20, 2015. The tailings impoundment, dam, and diversion channel were in good condition. The dam inspection and associated piezometer water level measurements verified that the tailings dam is functioning as designed. A damaged perimeter sign was replaced in July 2015. Inspectors

  7. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Lakeview, Oregon Page 9-1 9.0 Lakeview, Oregon, Disposal Site 9.1 Compliance Summary The Lakeview, Oregon, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected September 16 and 17, 2015. Other than some ongoing concern with erosion-control rock riprap degradation, the disposal cell was in good condition. Some minor fence repairs and vegetation removal, and minor erosion repair work along the west site fence is planned. Inspectors identified no other

  8. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    Office of Legacy Management (LM)

    Bluewater, New Mexico Page 1-1 1.0 Bluewater, New Mexico, Disposal Site 1.1 Compliance Summary The Bluewater, New Mexico, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II Disposal Site was inspected on August 19 and 20, 2015. A significant pond was present on the top slope of the main tailings disposal cell cover in an area where shallow depressions are present; disposal cell performance is being evaluated to determine if additional monitoring or cover enhancement is necessary.

  9. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Gunnison, Colorado Page 8-1 8.0 Gunnison, Colorado, Disposal Site 8.1 Compliance Summary The Gunnison, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on July 1, 2015. The disposal cell and all associated surface water diversion and drainage structures were in excellent condition and functioning as designed. Six riprap test areas on the cell apron and diversion ditches were visually inspected; no rock degradation was noted when compared to 2012

  10. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Rifle, Colorado Page 14-1 14.0 Rifle, Colorado, Disposal Site 14.1 Compliance Summary The Rifle, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on June 30, 2015. The disposal cell and all associated surface-water diversion and drainage structures were in good condition and functioning as designed. Vegetation on the site was in excellent condition. Minor fence repairs and perimeter sign maintenance will be conducted prior to the next inspection.

  11. No Slide Title | Department of Energy

    Energy Savers [EERE]

    No Slide Title No Slide Title PDF icon No Slide Title More Documents & Publications Slide 1 EVMS and Project Analysis Standard Operating Procedure (EPASOP) Hanford ETR - Tank Waste Treatment and Immobilization Plant - Hanford Tank Waste Treatment and Immobilization Plant Technical Review - Estimate at Completion (Cost) Report

  12. Presentation Title

    U.S. Energy Information Administration (EIA) Indexed Site

    meeting 1: Industrial updates and some preliminary results Macro Industrial Working Group (MIWG) Industrial Team: Kelly Perl, Team Leader; Peter Gross, Susan Hicks, Paul Otis December 3, 2015 | Washington, DC Preliminary Results. Do not Disseminate. AEO2016 additions for industrial * Technology choice models complete; end of 5 year effort * Benchmarking improvements - Individual industry benchmarking complete - On-going effort to coordinate reporting and benchmarking with refinery model (LFMM) *

  13. PRESENTATION TITLE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    STRONG ® Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 9 June 2010 BUILDING STRONG ® 303(d) Listing of Broken Bow Tailwaters Impairment Impaired Use Cadmium Fish and Wildlife Propagation - Trout Fishery Lead Fish and Wildlife Propagation - Trout Fishery Water Temperature* Fish and Wildlife Propagation - Trout Fishery The 303(d) List reports on waters identified as impaired. These waters: Have elevated portions of one or more pollutants. Do not meet one or more water

  14. TITLE PAGE

    Office of Scientific and Technical Information (OSTI)

    October 1, 2004 Reporting Period End Date: March 31, 2005 Principal Authors: Douglas G. Patchen, Katharine Lee Avary, John M. Bocan, Michael Hohn, John B. Hickman, Paul D. Lake, James A. Drahovzal, Christopher D. Laughrey, Jaime Kostelnik, Taury Smith, Ron Riley and Mark Baranoski April 2005 DOE Award Number: DE-FC26-03NT41856 West Virginia University Research Corporation P.O. Box 6845, Morgantown, WV 26506-6845 University of Kentucky Research Foundation 109 Kinkead Hall, Lexington, KY

  15. Presentation Title

    Office of Environmental Management (EM)

    4/20/2015 2:07 PM Budget Atomization April 2015 National Nuclear Security Administration 2 4/20/2015 2:07 PM Overview of NNSA Budget Structure As of May 2014: * 4 Treasury Symbols o Weapons Activities (WA), Defense Nuclear Nonproliferation (DNN), Naval Reactors (NR), and Federal Salaries and Expenses (FSE) o Federal personnel accounts in FSE, WA, and NR have sub-accounts within 4 symbols o Congressional approval required to move funds between * 166 Congressional Controls o 123 (74%) < $50M o

  16. Updated Reporting Requirement Checklist including the Research Performance Progress Report (RPPR)

    Broader source: Energy.gov [DOE]

    Policy Flash 2011-63 transmitted the previous versions of the Reporting Requirements Checklists and the Research Performance Progress Report (RPPR) which was an attachment to the checklist.

  17. Specifications of the octupole magnets required for the ATF2...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Specifications of the octupole magnets required for the ATF2 ultra-low * lattice Citation Details In-Document Search Title: Specifications of the octupole...

  18. High Energy Physics and Nuclear Physics Network Requirements...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: High Energy Physics and Nuclear Physics Network Requirements Citation Details In-Document Search Title: High Energy Physics and Nuclear Physics Network ...

  19. TITLE XVII | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TITLE XVII TITLE XVII TITLE XVII INNOVATIVE CLEAN ENERGY LOAN GUARANTEE PROGRAM The Title ... advanced fossil energy, nuclear energy, renewable energy, and energy efficiency. ...

  20. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Durango, Colorado Page 4-1 4.0 Durango, Colorado, Disposal Site 4.1 Compliance Summary The Durango, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on June 2, 2015. The disposal cell was in good condition. Vegetation on top of the disposal cell was healthy, and several small shrubs growing on the side slopes will be controlled. A small depression observed in 2014 on the disposal cell side slope was no longer apparent. Inspectors identified no

  1. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Naturita, Colorado Page 13-1 13.0 Naturita, Colorado, Disposal Site 13.1 Compliance Summary The Naturita, Colorado, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on May 12, 2015. The site was in excellent condition. A section of the perimeter fence had been trampled down and several loose fence strands were identified. The fence sections were repaired 2 weeks after the inspection. Inspectors identified no other needs or cause for a follow-up or

  2. 2015 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Office of Legacy Management (LM)

    Salt Lake City, Utah Page 15-1 15.0 Salt Lake City, Utah, Disposal Site 15.1 Compliance Summary The Salt Lake City, Utah, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title I Disposal Site was inspected on June 22, 2015. The disposal cell was in good condition. Observations of rock quality monitoring plots indicated no obvious change from the previous year. Inspectors did note vegetation buildup along the access road that surrounds the cell. No waste debris or indication of windblown or

  3. DOE Recovery Act Reporting Requirements for the State Energy Program

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) State Energy Program (SEP) reporting requirements for states and U.S. territories receiving SEP grants under the 2009 Recovery Act.

  4. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  5. Technology Requirements for In-Situ Decommissioning Workshop Report |

    Energy Savers [EERE]

    Department of Energy Services » Site & Facility Restoration » Deactivation & Decommissioning (D&D) » D&D Workshops » Technology Requirements for In-Situ Decommissioning Workshop Report Technology Requirements for In-Situ Decommissioning Workshop Report In recognition of the increasing attention being focused on In Situ Decommissioning (ISD or entombment) as an acceptable and beneficial decommissioning end state, EM is developing guidance for the implementation of ISD of

  6. News Release: 2010 UMTRCA Title I and Title II Disposal Sites...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites and the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation ...

  7. Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2008-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is further supported by a No Further Investigation (NFI) determination made on land that adjoins ED-4 to the east (DOE 1997a) and to the south (DOE 1997b).

  8. Microsoft Word - Title X Reimbursements.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Office of Inspector General Office of Audit Operations Audit Report Management Controls Over Title X Claims Reimbursement at the West Chicago Thorium Processing Facility ...

  9. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  10. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T.

    1995-12-31

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  11. Capital budgeting for utilities: The revenue requirements method: Final report

    SciTech Connect (OSTI)

    Not Available

    1986-10-01

    This report is an exposition of the revenue requirements method for project evaluation in the electric utility industry. The results are developed from first principles of economics and finance. Application of the results is illustrated by a series of hypothetical calculations. Revenue requirements are a way of expressing the costs associated with an investment. The revenue requirements method can be used to choose among alternatives that provide an equivalent amount and quality of service. If alternatives do not provide equivalent service, then the appropriate economic comparison depends on the value of service as well as the cost. Market discount rates rather than so-called ''customer discount rates'' should be used to calculate the present value of revenue requirements. In general, however, the risk-adjusted discount rates that are appropriate for calculating the present value of revenue requirements differ from those used to calculate net present value.

  12. TITLE XVII GOVERNING DOCUMENTS

    Broader source: Energy.gov [DOE]

    The following lists documents that provide the statutory and legislative framework for the Title XVII loan guarantee program.

  13. Revenue Requirements Model (RRM) documentation. Final report (Revised)

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The Revenue Requirements Model (RRM) is designed to estimate the impact of various regulatory and economic policy variables on the total revenue requirements of electric utilities. The RRM is built to utilize financial data extracted from the Standard and Poor's (S and P) Compustat II Utility data base (a proprietary data base). The RRM uses a simplified regulatory accounting framework to estimate the cost of service of the electric operations of utilities. The RRM is written in SAS, a proprietary software system. The RRM produces a series of reports including a summary of key data utilized therein, an income statement, revenue requirements, and selected key financial measures. Each report includes estimates for a base case and a hypothetical case. 4 figures, 6 tables.

  14. TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements

    SciTech Connect (OSTI)

    Alan Bond

    2001-04-01

    This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

  15. Operations other than war: Requirements for analysis tools research report

    SciTech Connect (OSTI)

    Hartley, D.S. III

    1996-12-01

    This report documents the research effort to determine the requirements for new or improved analysis tools to support decisions at the strategic and operational levels for military Operations Other than War (OOTW). The work was performed for the Commander in Chief, U.S. Pacific Command (USCINCPAC). The data collection was based on workshops attended by experts in OOTWs: analysis personnel from each of the Combatant Commands, the Services, the Office of the Secretary of Defense (OSD), the Joint Staff, and other knowledgeable personnel. Further data were gathered from other workshops and conferences and from the literature. The results of this research begin with the creation of a taxonomy of OOTWs: categories of operations, attributes of operations, and tasks requiring analytical support. The tasks are connected to the Joint Staff`s Universal Joint Task List (UJTL). Historical OOTWs are analyzed to produce frequency distributions by category and responsible CINC. The analysis products are synthesized into a list of requirements for analytical tools and definitions of the requirements. The report concludes with a timeline or roadmap for satisfying the requirements.

  16. Moly99 Production Facility: Report on Beamline Components, Requirements, Costs

    SciTech Connect (OSTI)

    Bishofberger, Kip A.

    2015-12-23

    In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introduced briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.

  17. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings

    Office of Scientific and Technical Information (OSTI)

    Radiation Control Act Title I Disposal Sites (Technical Report) | SciTech Connect Technical Report: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites Citation Details In-Document Search Title: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites This report, in fulfillment of a license requirement, presents the results of long-term surveillance and

  18. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings

    Office of Scientific and Technical Information (OSTI)

    Radiation Control Act Title II Disposal Sites (Technical Report) | SciTech Connect Technical Report: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites Citation Details In-Document Search Title: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites This report, in fulfillment of a license requirement, presents the results of long-term surveillance and

  19. FY09_Federal_Real_Property_Reporting_Requirements.pdf | Department of

    Energy Savers [EERE]

    Energy _Federal_Real_Property_Reporting_Requirements.pdf FY09_Federal_Real_Property_Reporting_Requirements.pdf PDF icon FY09_Federal_Real_Property_Reporting_Requirements.pdf More Documents & Publications 2013 guidance fo real Property Inventory Reporting FY 2012 Federal Real Property Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations

  20. Environmental Baseline Survey Report for the Title Transfer of Parcel ED-9 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2010-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.

  1. Final scientific report for DOE award title: Improving the Representation of Ice Sedimentation Rates in Global Climate Models

    SciTech Connect (OSTI)

    Mitchell, David L.

    2013-09-05

    It is well known that cirrus clouds play a major role in regulating the earth’s climate, but the details of how this works are just beginning to be understood. This project targeted the main property of cirrus clouds that influence climate processes; the ice fall speed. That is, this project improves the representation of the mass-weighted ice particle fall velocity, Vm, in climate models, used to predict future climate on global and regional scales. Prior to 2007, the dominant sizes of ice particles in cirrus clouds were poorly understood, making it virtually impossible to predict how cirrus clouds interact with sunlight and thermal radiation. Due to several studies investigating the performance of optical probes used to measure the ice particle size distribution (PSD), as well as the remote sensing results from our last ARM project, it is now well established that the anomalously high concentrations of small ice crystals often reported prior to 2007 were measurement artifacts. Advances in the design and data processing of optical probes have greatly reduced these ice artifacts that resulted from the shattering of ice particles on the probe tips and/or inlet tube, and PSD measurements from one of these improved probes (the 2-dimensional Stereo or 2D-S probe) are utilized in this project to parameterize Vm for climate models. Our original plan in the proposal was to parameterize the ice PSD (in terms of temperature and ice water content) and ice particle mass and projected area (in terms of mass- and area-dimensional power laws or m-D/A-D expressions) since these are the microphysical properties that determine Vm, and then proceed to calculate Vm from these parameterized properties. But the 2D-S probe directly measures ice particle projected area and indirectly estimates ice particle mass for each size bin. It soon became apparent that the original plan would introduce more uncertainty in the Vm calculations than simply using the 2D-S measurements to directly calculate Vm. By calculating Vm directly from the measured PSD, ice particle projected area and estimated mass, more accurate estimates of Vm are obtained. These Vm values were then parameterized for climate models by relating them to (1) sampling temperature and ice water content (IWC) and (2) the effective diameter (De) of the ice PSD. Parameterization (1) is appropriate for climate models having single-moment microphysical schemes whereas (2) is appropriate for double-moment microphysical schemes and yields more accurate Vm estimates. These parameterizations were developed for tropical cirrus clouds, Arctic cirrus, mid-latitude synoptic cirrus and mid-latitude anvil cirrus clouds based on field campaigns in these regions. An important but unexpected result of this research was the discovery of microphysical evidence indicating the mechanisms by which ice crystals are produced in cirrus clouds. This evidence, derived from PSD measurements, indicates that homogeneous freezing ice nucleation dominates in mid-latitude synoptic cirrus clouds, whereas heterogeneous ice nucleation processes dominate in mid-latitude anvil cirrus. Based on these findings, De was parameterized in terms of temperature (T) for conditions dominated by (1) homo- and (2) heterogeneous ice nucleation. From this, an experiment was designed for global climate models (GCMs). The net radiative forcing from cirrus clouds may be affected by the means ice is produced (homo- or heterogeneously), and this net forcing contributes to climate sensitivity (i.e. the change in mean global surface temperature resulting from a doubling of CO2). The objective of this GCM experiment was to determine how a change in ice nucleation mode affects the predicted global radiation balance. In the first simulation (Run 1), the De-T relationship for homogeneous nucleation is used at all latitudes, while in the second simulation (Run 2), the De-T relationship for heterogeneous nucleation is used at all latitudes. For both runs, Vm is calculated from De. Two GCMs were used; the Community Atmosphere Model version 5 (CAM5) and a European GCM known as ECHAM5 (thanks to our European colleagues who collaborated with us). Similar results were obtained from both GCMs in the Northern Hemisphere mid-latitudes, with a net cooling of ~ 1.0 W m-2 due to heterogeneous nucleation, relative to Run 1. The mean global net cooling was 2.4 W m-2 for the ECHAM5 GCM while CAM5 produced a mean global net cooling of about 0.8 W m-2. This dependence of the radiation balance on nucleation mode is substantial when one considers the direct radiative forcing from a CO2 doubling is 4 W m-2. The differences between GCMs in mean global net cooling estimates may demonstrate a need for improving the representation of cirrus clouds in GCMs, including the coupling between microphysical and radiative properties. Unfortunately, after completing this GCM experiment, we learned from the company that provided the 2D-S microphysical data that the data was corrupted due to a computer program coding problem. Therefore the microphysical data had to be reprocessed and reanalyzed, and the GCM experiments were redone under our current ASR project but using an improved experimental design.

  2. 2009 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Environmental Stewardship Group

    2010-11-01

    For reporting year 2009, Los Alamos National Laboratory (LANL) submitted a Form R report for lead as required under the Emergency Planning and Community Right-to- Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2009 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2009, as well as to provide background information about data included on the Form R reports.

  3. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect (OSTI)

    Facca, G.; Faler, M.

    1998-12-31

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  4. TYPE REPORT DOCUMENT TITLE HERE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... for CO2 Storage from Coal-fired Power Facilities in the Black Warrior Basin of ... of Kansas Modeling CO2 Sequestration in a Saline Aquifer and Depleted Oil Reservoir to ...

  5. WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Energy Savers [EERE]

    Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy : ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements Under the American Recovery and Reinvestment Act of 2009 for the

  6. WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly

    Energy Savers [EERE]

    Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program | Department of Energy a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the Weatherization Assistance Program WPN 10-13a: ARRA Reporting Requirements: OMB Quarterly and DOE Monthly Reporting Requirements under the American Recovery and Reinvestment Act of 2009 for the

  7. 2002 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    M. Stockton

    2003-11-01

    For reporting year 2002, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead compounds and mercury as required under the Emergency Planning and Community Right-to-Know Act (EPCRA), Section 313. No other EPCRA Section 313 chemicals were used in 2002 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical usage and threshold determinations for LANL for calendar year 2002 as well as provide background information about the data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999 EPA promulgated a final rule on Persistent Bioaccumulative Toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable under EPCRA Section 313. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R.

  8. 2006 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Ecology and Air Quality Group (ENV-EAQ)

    2007-12-12

    For reporting year 2006, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead as required under the Emergency Planning and Community Right-to-Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2006 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2006, as well as to provide background information about data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999, EPA promulgated a final rule on persistent bioaccumulative toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R.

  9. 2004 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    M. Stockton

    2006-01-15

    Section 313 of Emergency Planning and Community Right-to-Know Act (EPCRA) specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. For reporting year 2004, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead compounds, nitric acid, and nitrate compounds as required under the EPCRA Section 313. No other EPCRA Section 313 chemicals were used in 2004 above the reportable thresholds. This document provides a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2004, as well as background information about data included on the Form R reports.

  10. Widget:SetTitle | Open Energy Information

    Open Energy Info (EERE)

    Parameters include: title - title text to display Usage: Widget:SetTitle |titleHello World Retrieved from "http:en.openei.orgwindex.php?titleWidget:SetTitle&oldid...

  11. Implementation of Division F, Title I, Title II, and Title III...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 Implementation of Division F, Title I, Title II, and Title III and Division G, ...

  12. Environmental Baseline Survey Report for the Title Transfer of the K-792 Switchyard Complex at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2009-12-01

    This environmental baseline survey (EBS) documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-792 Switchyard Complex, which includes the former K-792 Switchyard, the K-79 1-B building, the K-796-A building, and the K-792 Northern Expansion Area located in the northwestern portion of the East Tennessee Technology Park (ETTP). The total area of the property is approximately 19.91 acres. DOE is proposing to transfer the title of this land area and buildings to the Heritage Center, LLC (Heritage Center), a subsidiary corporation of the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the transfer of this government-owned facility at ETTP to a non-federal entity. The area proposed for title transfer includes the former K-792 Switchyard, the K-792 Northern Expansion Area, Bldg. K-791-B, Bldg. K-796-A, and the underlying property known as the underlying fee. Located within the K-792 Switchyard footprint but not included in the transfer are Bldg. K-131 0-MP and Bldg. K- 131 0-MQ, two buildings owned by a private company that leases space in the northern portion of the Switchyard. The transfer footprint is bounded by Perimeter Road to the north and west, the parking area for Portal 8 to the south, and primarily the former K-792 Powerhouse Complex and Avenue 'U' North to the east; however, the eastern boundary along the Northern Expansion area has no physical features associated with it. Zone 2 remedial action objectives were developed by the DVS to support the future use of ETTP as a mixed-use commercial and industrial park. Therefore, remediation criteria were designed for the protection of the future industrial worker under the assumption the worker normally would not have the potential for exposure to soils at depths below 10 ft below ground surface (bgs). Accordingly, land use controls (LUCs) have been established to restrict disturbance of soils below 10 ft deep and to limit future land use to industriallcornmercial activities. Where the need for LUCs below 10 ft bgs is not warranted, this is so stated and explained. Once all actions associated with the DVS for Zone 1 and Zone 2 are completed and the data support it, there will be a re-evaluation with EPA and TDEC for the restriction on excavation below 10 ft. The DVS process and the preparation of this report included visual and physical inspections of the property and adjacent properties, a detailed records search, sampling and analysis of soils, radiological walkover surveys, and a risk evaluation. Resources evaluated as part of the records search included Federal Government records, title documents, aerial photographs that may reflect prior uses, and interviews with current and former employees 1 involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes were stored for one year or more, known to have been released, or disposed of. In addition, radiological surveys of Bldgs. K-791-B and K-796-A were conducted to assess the buildings radiological condition. Soil vapor sampling and polychlorinated biphenyl (PCB) swipe sampling also were conducted within the buildings. Based on the U. S. Department of Energy's (DOE's) review of the existing information, including discussions and interviews referenced herein, and evaluation of the data gathered in preparation of the environmental baseline survey (EBS) for the K-792 Switchyard Complex, DOE recommends the following: Due to the uncertainty associated with the nature of the on-site groundwater and the need to evaluate and possibly address groundwater in the future, DOE recommends that the transfer of the K-792 Switchyard Complex be achieved by a covenant deferral per the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Sect. 120(h)(3)(c). Land use restrictions associated with the covenant deferral are described.

  13. ASC Computational Environment (ACE) requirements version 8.0 final report.

    SciTech Connect (OSTI)

    Larzelere, Alex R. (Exagrid Engineering, Alexandria, VA); Sturtevant, Judith E.

    2006-11-01

    A decision was made early in the Tri-Lab Usage Model process, that the collection of the user requirements be separated from the document describing capabilities of the user environment. The purpose in developing the requirements as a separate document was to allow the requirements to take on a higher-level view of user requirements for ASC platforms in general. In other words, a separate ASC user requirement document could capture requirements in a way that was not focused on ''how'' the requirements would be fulfilled. The intent of doing this was to create a set of user requirements that were not linked to any particular computational platform. The idea was that user requirements would endure from one ASC platform user environment to another. The hope was that capturing the requirements in this way would assist in creating stable user environments even though the particular platforms would be evolving and changing. In order to clearly make the separation, the Tri-lab S&CS program decided to create a new title for the requirements. The user requirements became known as the ASC Computational Environment (ACE) Requirements.

  14. State Energy Program Notice 10-006D, Reporting Requirements | Department of

    Energy Savers [EERE]

    Energy State Energy Program Notice 10-006D, Reporting Requirements State Energy Program Notice 10-006D, Reporting Requirements State Energy Program (SEP) Notice 10-006D provides guidance to SEP recipients on the requirements of reporting for SEP Recovery Act awards under the American Recovery and Reinvestment Act of 2009 and SEP formula awards under the Energy Policy and Conservation Act. PDF icon State Energy Program Notice 10-006D, Reporting Requirements More Documents & Publications

  15. Section 1512 Reporting Requirements under ARRA | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements under ARRA More Documents & Publications Appendix B Section 1605 Buy American Provision under ARRA Intelligence Reform and Terrorism Prevention Act - December 17, 2004

  16. IT Reporting Format and Requirements for the BY 2017 Budget Submission |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reporting Format and Requirements for the BY 2017 Budget Submission IT Reporting Format and Requirements for the BY 2017 Budget Submission IT Reporting Format and Requirements for the BY 2017 Budget Submission PDF icon DOE BY 2017 IT Reporting Instructions_IT Portfolio_Final.pdf More Documents & Publications DOE BY 2017 IT Reporting Instructions Major IT Business BY16 DOE IT CPIC Guide_Final DOE Guide to IT Capital Planning and Investment Control BY 2016

  17. G Subject: Implementation of Division D, Title III and Title V, and Division E, Title

    Energy Savers [EERE]

    G Subject: Implementation of Division D, Title III and Title V, and Division E, Title Title VII of the Consolidated and Further Continuing Appropriations Act, 2015, Pub. L. No.113-235 References: Consolidated and Further Continuing Division D, Title III, Sections Appropriations Act, 2015, Pub.L. No. 113-235 301(a), 304, 305, 307, and 310 and Title V, Section 501; Division E, Title VII, Sections 733, 735, 739, 743, 744, 745 and 747 When is this Acquisition Letter (AL) effective? The statutory

  18. G Subject: Implementation of Division F, Title I, Title II, and Title III, and

    Energy Savers [EERE]

    F, Title I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113- References: Consolidated and Further Continuing Division F, Titles I, II, and III Appropriations Act, 2013, Pub. L. No. 113-6 Division G, Section 3003 Consolidated Appropriations Act, 2012, Division B, Title III, Section Pub. L. No. 112-74 301(a), 301(b), 316, and Title V, Sections 501, 504, 505 Division C, Title VII, Section 725 When is this Financial Assistance

  19. Title Tags for Websites Outside of the Energy.gov Drupal Environment

    Broader source: Energy.gov [DOE]

    These standards are required when coding title tags on websites and applications outside the Energy.gov Drupal environment.

  20. Nuclear Physics Science Network Requirements Workshop, May 2008 - Final Report

    SciTech Connect (OSTI)

    Tierney, Ed., Brian L; Dart, Ed., Eli; Carlson, Rich; Dattoria, Vince; Ernest, Michael; Hitchcock, Daniel; Johnston, William; Kowalski, Andy; Lauret, Jerome; Maguire, Charles; Olson, Douglas; Purschke, Martin; Rai, Gulshan; Watson, Chip; Vale, Carla

    2008-11-10

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In May 2008, ESnet and the Nuclear Physics (NP) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the NP Program Office. Most of the key DOE sites for NP related work will require significant increases in network bandwidth in the 5 year time frame. This includes roughly 40 Gbps for BNL, and 20 Gbps for NERSC. Total transatlantic requirements are on the order of 40 Gbps, and transpacific requirements are on the order of 30 Gbps. Other key sites are Vanderbilt University and MIT, which will need on the order of 20 Gbps bandwidth to support data transfers for the CMS Heavy Ion program. In addition to bandwidth requirements, the workshop emphasized several points in regard to science process and collaboration. One key point is the heavy reliance on Grid tools and infrastructure (both PKI and tools such as GridFTP) by the NP community. The reliance on Grid software is expected to increase in the future. Therefore, continued development and support of Grid software is very important to the NP science community. Another key finding is that scientific productivity is greatly enhanced by easy researcher-local access to instrument data. This is driving the creation of distributed repositories for instrument data at collaborating institutions, along with a corresponding increase in demand for network-based data transfers and the tools to manage those transfers effectively. Network reliability is also becoming more important as there is often a narrow window between data collection and data archiving when transfer and analysis can be done. The instruments do not stop producing data, so extended network outages can result in data loss due to analysis pipeline stalls. Finally, as the scope of collaboration continues to increase, collaboration tools such as audio and video conferencing are becoming ever more critical to the productivity of scientific collaborations.

  1. Environmental management requirements/defensible costs project. Final report

    SciTech Connect (OSTI)

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  2. Class Deviation – Extending the Biobased Product Reporting Requirement

    Broader source: Energy.gov [DOE]

    The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2013-01 to encourage agencies to extend the reporting deadline contained in paragraph (c)(2) of the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, from October 31, 2012 to December 31, 2012. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency Acquisition Letter 2013-01.

  3. Title: Author(s):

    Office of Scientific and Technical Information (OSTI)

    LA:UR- $-3233 Title: Author(s): Submitted to: Los Alamos N A T I O N A L L A B O R A T O R Y STAINLESS STEEL WIRE MESH FLOW-FIELDS FOR POLYMER ELECTROLYTE FUEL CELLS C. Zawodzinski, M. S. Wilson, S. Gottesfeld Fuel Cell Seminar Kissimee, FL November 1996 A Los Alamos National Laboratory, an affirmative action/equal opportunity empldyer, is operated by the University of California for the US. Department of Energy under contract W-7405-ENG-36. By acceptance of this article, the publisher

  4. Title: A Novel Method

    Office of Scientific and Technical Information (OSTI)

    Title: A Novel Method for Accurate Operon Predictions in All Sequenced Prokaryotes Authors: Morgan N. Price, Katherine H. Huang, Eric J. Alm, and Adam P. Arkin Author affiliation: Lawrence Berkeley Lab, Berkeley CA, USA. A.P.A. is also affiliated with the Howard Hughes Medical Institute and the UC Berkeley Dept. of Bioengineering. Corresponding author: Eric J. Alm, ejalm@lbl.gov, phone 510-843-1794, fax 510-486-6059, ad- dress Lawrence Berkeley National Lab, 1 Cyclotron Road, Mailstop 939R704,

  5. Title | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Recipient Reporting on FederalReporting.gov Microsoft PowerPoint - FederalReporting Grants Apr 2010 Compatibility Mode

  6. Title | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Microsoft PowerPoint - FederalReporting Grants Apr 2010 [Compatibility Mode] Recovery Act Recipient Reporting on FederalReporting.gov

  7. Microsoft PowerPoint - IAEA Safeguards Reporting Requirements for U.S. Facilities_Peter Habighorst

    National Nuclear Security Administration (NNSA)

    IAEA Safeguards Reporting Requirements for U.S. Facilities Peter Habighorst, MC&A Branch Chief U.S. Nuclear Regulatory Commission IAEA Nuclear Material Reporting to the IAEA BACKGROUND - Overview of Governing Requirements Reporting Requirements  IAEA Information Circular (INFCIRC)/207, Notification to the Agency of Exports and Imports of Nuclear Material, July 1974  IAEA INFCIRC/288, Agreement between the United States of America and the Agency for Safeguards in the United States,

  8. Photovoltaic module electrical termination design requirement study. Final report

    SciTech Connect (OSTI)

    Mosna, F.J. Jr.; Donlinger, J.

    1980-07-01

    Motorola Inc., in conjunction with ITT Cannon, has conducted a study to develop information to facilitate the selection of existing, commercial, electrical termination hardware for photovoltaic modules and arrays. Details of the study are presented in this volume. Module and array design parameters were investigated and recommendations were developed for use in surveying, evaluating, and comparing electrical termination hardware. Electrical termination selection criteria factors were developed and applied to nine generic termination types in each of the four application sectors. Remote, residential, intermediate and industrial. Existing terminations best suited for photovoltaic modules and arrays were identified. Cost information was developed to identify cost drivers and/or requirements which might lead to cost reductions. The general conclusion is that there is no single generic termination that is best suited for photovoltaic application, but that the appropriate termination is strongly dependent upon the module construction and its support structure as well as the specific application sector.

  9. TECHNOLOGY REQUIREMENTS FOR IN SITU DECOMMISSIONING WORKSHOP REPORT

    SciTech Connect (OSTI)

    Jannik, T.; Lee, P.; Gladden, J.; Langton, C.; Serrato, M.; Urland, C.; Reynolds, E.

    2009-06-30

    In recognition of the increasing attention being focused on In Situ Decommissioning (ISD or entombment) as an acceptable and beneficial decommissioning end state, the Department of Energy's (DOE) Office of Environmental Management (EM) is developing guidance for the implementation of ISD of excess facilities within the DOE complex. Consistent with the overarching DOE goals for increased personnel and environmental safety, reduced technical uncertainties and risks, and overall gains in efficiencies and effectiveness, EM's Office of Deactivation and Decommissioning and Facility Engineering (EM-23) initiated efforts to identify the technical barriers and technology development needs for the optimal implementation of ISD. Savannah River National Laboratory (SRNL), as the EM Corporate Laboratory, conducted an ISD Technology Needs Workshop to identify the technology needs at DOE sites. The overall goal of the workshop was to gain a full understanding of the specific ISD technical challenges, the technologies available, and those needing development. The ISD Workshop was held December 9-10, 2008 in Aiken, SC. Experienced decommissioning operations personnel from Richland Operations Office (RL), Idaho National Laboratory (INL) and Savannah River Site (SRS) along with scientists and engineers specific expertise were assembled to identify incremental and 'game changing' solutions to ISD technology challenges. The workshop and follow-up activities yielded 14 technology needs statements and the recommendation that EM-23 prioritize and pursue the following specific technology development and deployment actions. For each action, the recommended technology acquisition mechanisms (competitive solicitation (CS) or direct funding (TCR)) are provided. Activities that are time critical for ISD projects, or require unique capabilities that reside in the DOE Laboratory system will be funded directly to those institutions. Activities that have longer lead times and where the private sector, universities or other agencies are expected to have greater expertise will be accomplished through an open, competitive solicitation process. Several areas will require joint efforts from the two classes of resources.

  10. Optimizing operational flexibility and enforcement liability in Title V permits

    SciTech Connect (OSTI)

    McCann, G.T.

    1997-12-31

    Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

  11. No Slide Title

    National Nuclear Security Administration (NNSA)

    NMMSS and upgrade * Changes are intended to simplify reporting for users (Debarah Smith) * Additional policy changes may result from DOENRC unified reporting effort (Garland...

  12. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lightweight and Propulsion Materials | Department of Energy Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials PDF icon wr_ldvehicles.pdf More Documents & Publications WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials Summary of the Output from the VTP Advanced

  13. No Slide Title

    National Nuclear Security Administration (NNSA)

    (if not losstheftdiversion of significant srd) - Enrichment plants, plutoniumuranium fuel fabricators and down blending plants (>10% enriched uranium) report all...

  14. Title III List of Lists: Consolidated list of chemicals subject to the Emergency Planning and Community Right-to-Know Act (EPCRA) and Section 112(r) of the Clean Air Act, as amended. Title III of the Superfund Amendments and Reauthorization Act of 1986, and Title III of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    1996-12-01

    This consolidated chemical list includes chemicals subject to reporting requirements under Title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA), also known as the Emergency Planning and Community Right-to-Know Act (EPCRA) and chemicals listed under Section 112(r) of Title III of the Clean Air Act (CAA) Amendments of 1990. This consolidated list has been prepared to help firms handling chemicals determine whether they need to submit reports under sections 302, 304, or 314 or SARA Title III (EPCRA) and, for a specific chemical, what reports may need to be submitted. It also will also help firms determine whether they will be subject to accident prevention regulations under CAA section 112(r).

  15. Activity report

    SciTech Connect (OSTI)

    Yu, S W

    2008-08-11

    This report is aimed to show the author's activities to support the LDRD. The title is 'Investigation of the Double-C Behavior in the Pu-Ga Time-Temperature-Transformation Diagram' The sections are: (1) Sample Holder Test; (2) Calculation of x-ray diffraction patterns; (3) Literature search and preparing publications; (4) Tasks Required for APS Experiments; and (5) Communications.

  16. Energy Efficiency Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Administration October 31, 2012 Research Into Action, Inc. B Final Report Energy Smart Industrial Program: Process Evaluation Funded By: Prepared By: Marjorie McRae,...

  17. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015 DOCKETS

    Broader source: Energy.gov [DOE]

    Companies with authorizations to export LNG are required to file, on a semi-annual basis, written reports describing the progress of the planned liquefaction facility project that is part of the...

  18. TITLE XVII PROJECT ELIGIBILITY

    Broader source: Energy.gov [DOE]

    Applicants must meet all applicable eligibility requirements, including those described below, as well as those set forth in the Energy Policy Act of 2005, the Final Rule (10 CFR 609, dated October...

  19. Title Slide Examples

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5,444 228 Suspended Reports Per Household Measured Savings 208.1 12.0 Per Household Joint Rebate Program Savings 0.5 1.0 Per Household Joint Upstream Savings 43.3 na Per Household...

  20. Main Title 32pt

    National Nuclear Security Administration (NNSA)

    Department of Energy Draft Notice N 234.X Reporting of Radioactive Sealed Sources Fritz Strydom NAC International NMMSS Users Annual Training Meeting Atlanta, Georgia-May 22-24,...

  1. No Slide Title

    National Nuclear Security Administration (NNSA)

    Meeting New Orleans, Louisiana-May 24-26, 2005 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission NMMS S NMMSS Obligation Reporting Process:...

  2. Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act (CEQ, 2004)

    Broader source: Energy.gov [DOE]

    The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA).

  3. NREL Report Firms Up Land-Use Requirements of Solar - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report Firms Up Land-Use Requirements of Solar Study shows solar for 1,000 homes would require 32 acres July 30, 2013 The Energy Department's National Renewable Energy Laboratory (NREL) has published a report on the land use requirements of solar power plants based on actual land-use practices from existing solar facilities. "Having real data from a majority of the solar plants in the United States will help people make proper comparisons and informed decisions," lead author Sean Ong

  4. National Energy Policy Plan; A Report to the Congress Required by Title VIII of the Department of Energy Organization Act (Public Law 95-91)

    SciTech Connect (OSTI)

    Not Available

    1983-10-01

    Since the third National Energy Plan in 1981 total energy efficiency has increased, domestic energy resources are being developed more effectively, oil prices have declined, US dependence on foreign energy sources has diminished, and the nation's vulnerability to energy supply disruptions has been reduced markedly. The policy goal is an adequate supply of energy at reasonable costs. Strategies include minimizing federal control and involvement in energy markets while maintaining public health and safety and environmental quality and promoting a balanced and mixed energy resource system. Federal programs and actions in energy are reviewed.

  5. WORKSHOP REPORT:Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VEHICLES TECHNOLOGIES OFFICE WORKSHOP REPORT: Light-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials February 2013 FINAL REPORT This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any

  6. Title IX | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to

  7. Title VI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of

  8. Major Design Changes Late in Title II or early in Title III Can...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design Changes Late in Title II or early in Title III Can Be Costly PMLL Identifier: ... design changes occur late in Title II or early in Title III Discussion: Numerous ...

  9. FINAL PROJECT REPORT DOE Early Career Principal Investigator Program Project Title: Developing New Mathematical Models for Multiphase Flows Based on a Fundamental Probability Density Function Approach

    SciTech Connect (OSTI)

    Shankar Subramaniam

    2009-04-01

    This final project report summarizes progress made towards the objectives described in the proposal entitled “Developing New Mathematical Models for Multiphase Flows Based on a Fundamental Probability Density Function Approach”. Substantial progress has been made in theory, modeling and numerical simulation of turbulent multiphase flows. The consistent mathematical framework based on probability density functions is described. New models are proposed for turbulent particle-laden flows and sprays.

  10. The Title Goes Here

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Multi-Physics Problems Youngsuk Bang and Hany S. Abdel-Khalik North Carolina State University, Raleigh, North Carolina, USA ybang@ncsu.edu, adbelkhalik@ncsu.edu INTRODUCTION Reduced order modeling (ROM) has been recognized as an indispensable approach when the engineering analysis requires many executions of high fidelity simulation codes. Examples of such engineering analyses in neutronics calculations, representing the main focus of our current work, include the functionalization of few-

  11. No Slide Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ogren 10/24/2008 Miniature Multi-filter Continuous Light Absorption Photometer John A. Ogren and Jim Wendell Earth System Research Laboratory National Oceanic and Atmospheric Administration Boulder, CO J. Ogren 10/24/2008 Motivation for new design * Aerosol light absorption is a crucial contributor to radiative climate forcing * Current instruments all have shortcomings - filter transmission * PSAP's single filter requires frequent changes * aethalometer is poorly characterized * MAAP has best

  12. FES Science Network Requirements - Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008

    SciTech Connect (OSTI)

    Tierney, Brian; Dart, Eli; Tierney, Brian

    2008-07-10

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In March 2008, ESnet and the Fusion Energy Sciences (FES) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the FES Program Office. Most sites that conduct data-intensive activities (the Tokamaks at GA and MIT, the supercomputer centers at NERSC and ORNL) show a need for on the order of 10 Gbps of network bandwidth for FES-related work within 5 years. PPPL reported a need for 8 times that (80 Gbps) in that time frame. Estimates for the 5-10 year time period are up to 160 Mbps for large simulations. Bandwidth requirements for ITER range from 10 to 80 Gbps. In terms of science process and collaboration structure, it is clear that the proposed Fusion Simulation Project (FSP) has the potential to significantly impact the data movement patterns and therefore the network requirements for U.S. fusion science. As the FSP is defined over the next two years, these changes will become clearer. Also, there is a clear and present unmet need for better network connectivity between U.S. FES sites and two Asian fusion experiments--the EAST Tokamak in China and the KSTAR Tokamak in South Korea. In addition to achieving its goal of collecting and characterizing the network requirements of the science endeavors funded by the FES Program Office, the workshop emphasized that there is a need for research into better ways of conducting remote collaboration with the control room of a Tokamak running an experiment. This is especially important since the current plans for ITER assume that this problem will be solved.

  13. Interaction between Titles 2 and 3 of the Clean Air Act as amended, 1990

    SciTech Connect (OSTI)

    Szpunar, C.B.

    1996-02-01

    This report examines Some issues that would I affect the refining industry if the requirements for hazardous air pollutants set out in Title III of the Clean Air Act Amendments were to impede the market entrance of oxygenated fuels, as me; required by Title II. It describes the mandate for reformulated gasoline; considers gasoline characteristics in light of component shifts in refining; examines the supply of, demand for, and cost of various feedstocks and blendstocks; and identifies the emissions and atmospheric impacts that might result from the production and use of reformulated gasoline. Attention is focused on methanol and MTBE, two potential blendstocks that are also hazardous air pollutants, and on maximum achievable control technology standards, which might be applied to the stationary sources that produce them.

  14. No Slide Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agenda RACORO Breakout Session RACORO Breakout Session Routine AVP CLOWD Radiative Observations Routine AVP CLOWD Radiative Observations Thursday, 13 March; 1:00 pm Thursday, 13 March; 1:00 pm - - 3:00 pm 3:00 pm 1:00 1:00 - - 1:20 1:20 INTRODUCTION & AVP OVERVIEW INTRODUCTION & AVP OVERVIEW Opening Comments, Rick Petty, DOE AVP Program Manager Opening Comments, Rick Petty, DOE AVP Program Manager AVP Goals & Instrument Requirements, Greg McFarquhar AVP Goals & Instrument

  15. Architectural requirements for the Red Storm computing system. (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Technical Report: Architectural requirements for the Red Storm computing system. Citation Details In-Document Search Title: Architectural requirements for the Red Storm computing system. This report is based on the Statement of Work (SOW) describing the various requirements for delivering 3 new supercomputer system to Sandia National Laboratories (Sandia) as part of the Department of Energy's (DOE) Accelerated Strategic Computing Initiative (ASCI) program. This

  16. TITLE XVII OPEN SOLICITATIONS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OPEN SOLICITATIONS TITLE XVII OPEN SOLICITATIONS TITLE XVII OPEN SOLICITATIONS LPO has more than 24 billion in remaining loan authority to help finance innovative clean energy ...

  17. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials

    Broader source: Energy.gov [DOE]

    WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials

  18. National Ignition Facility Title II Design Plan

    SciTech Connect (OSTI)

    Kumpan, S

    1997-03-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

  19. Hydrogen and Fuel Cell Activities, Progress, and Plans: Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    that fulfills the provisions of Title VIII of the Energy Policy Act of 2005 (EPACT). ... This is the first in a series of reports required by section 811(a) of the Energy Policy ...

  20. Title III hazardous air pollutants

    SciTech Connect (OSTI)

    Todd, R.

    1995-12-31

    The author presents an overview of the key provisions of Title III of the Clean Air Act Amendments of 1990. The key provisions include the following: 112(b) -- 189 Hazardous Air Pollutants (HAP); 112(a) -- Major Source: 10 TPY/25 TPY; 112(d) -- Application of MACT; 112(g) -- Modifications; 112(I) -- State Program; 112(j) -- The Hammer; and 112(r) -- Accidental Release Provisions.

  1. Microsoft Word - DOE Final Report Title Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... across the C-W interface, R 0 is the radius of curvature at the apex of the drop, H 0 and H 1 are the principle radii of curvature and z is the vertical distance from the apex. ...

  2. Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tips For Getting Hired Tips For Getting Hired Successful candidates know it takes a little extra effort to get to the top. This one hour workshop introduces you to the Department of Energy, in addition to guiding you in creating a competitive Federal resume, it also covers veteran hiring options, and offers important tips to help prepare for the interview. So, If you are new to the Federal government hiring process or just want to improve your odds of getting that critical interview, this

  3. Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Study of Scintillation, Fluorescence and Scattering in Mineral Oil for the MiniBooNE Neutrino Detector Bruce C. Brown, Senior-Member, IEEE,Stephen Brice, Eric Hawker, Shannon Maza, Hans-Otto Meyer, Anna Pla-Dalmau, Rex Tayloe, Hirohisa A. Tanaka and Dmitri Toptygin Abstract- The MiniBooNE neutrino detector at Fermilab (FNAL) is filled with 250,000 gallons of pure mineral oil. The principal signal for MiniBooNE is light observed in a prompt Cherenkov cone. Scattering and fluorescence modify our

  4. Title

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    under Contract No. DE-AC02-05CH11231. RESULTS AND ACCOMPLISHMENTS Intermediate-Scale Hydraulic Fracture and Stimulation Field Laboratory in a Deep Mine for the Investigation of...

  5. Title

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oil & Natural Gas R&D National Energy Technology Laboratory Office of Fossil Energy 2008 ... John R. Duda, Deputy Director Strategic Center for Natural Gas & Oil January 30, 2008 ...

  6. Title

    U.S. Energy Information Administration (EIA) Indexed Site

    Unlocking Energy Efficiency in the U.S. Economy 2010 Energy Conference EIA, SAIS April 7, 2010 McKinsey & Company | 1 Carbon emissions Gigatons CO 2 e * End-use consumption Quadrillion BTUs * Includes carbon emission abatement potential from CHP Source: EIA AEO 2008, McKinsey analysis Significant energy efficiency potential exists in the U.S. economy Industrial Residential Commercial -9.1 Baseline 2020 Baseline case, 2008 30.8 36.9 39.9 NPV- positive case, 2020 3.2 NPV- positive case, 2020

  7. Title

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    DESTABILIZINGACTIVITY Traders may distort efficient pricing in the futures markets only ... condition should hold if markets are efficient and arbitrage opportunities are ...

  8. Title

    National Nuclear Security Administration (NNSA)

    These regions included the ground zeros of above-ground nuclear tests, underground tests that vented, and some safety ... including an amplifier and power supply, a pulse-height ...

  9. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Education and Outreach Lesson Plan Visit our online activities collection http://education.arm.gov/ Grade levels 9-12 Monsoon Convection Cells http://education.arm.gov Monsoon Convection Cell: Grades 9-12 1 Monsoon Convection Cells Approximate Time 1 hour Objective The student will investigate how high- and low-pressure differences caused by temperature create monsoons as evidenced by the completion of the experiment. Background Information If you live near a large lake, then you may have heard

  10. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3-5 Rainfall and the Water Table: The Salinity of Soil http://education.arm.gov Rainfall and the Water Table: The Salinity of Soil: Grades 3-5 1 Rainfall and the Water Table: The Salinity of Soil Approximate Time Setup and initial experiment: 45 minutes, followed by several short time segments to observe, record, and add water to soil. Objective The student will be able to explain how an increase of rainfall influenced by climate change can affect the water table and soil salinity underground as

  11. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Education and Outreach Lesson Plan Visit our online activities collection http://education.arm.gov/ Grade levels 9-12 Thermal Expansion of Water Educational resources that have been selected by the Climate Literacy and Energy Awareness Network (CLEAN) have passed an extensive peer- review process to verify the accuracy and relevance of the science. http://education.arm.gov Thermal Expansion of Water: Grades 9-12 1 Thermal Expansion of Water Approximate Time 1 hour Objective The student will

  12. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    K-2 When Floating Ice Melts in the Sea http://education.arm.gov When Floating Ice Melts in the Sea: Grades K-2 1 When Floating Ice Melts in the Sea Approximate Time Two 30-minute periods for experiment; additional time for teacher-directed completion of Student Record Sheet. Objective The student will investigate the effect of melting ice on sea level due to global warming as evidenced by analyzing the data from the class experiment. Key Points to Understand * Global warming is the rise in

  13. Title

    National Nuclear Security Administration (NNSA)

    ... persons with extreme positions that have an emotional or economic rather than an ecological base. * Work performed under the auspices of the United States Atomic Energy Commission. ...

  14. TITLE

    Office of Legacy Management (LM)

    ... t o s a i d g r a n t o r ' s h e i r , Lee Hapard, extending the term o f s a i d grant through February 23, 1979; and WHEREAS, the Government has now completed the project f ...

  15. Title

    National Nuclear Security Administration (NNSA)

    ... Extract- .f?" 6 Strontium 90 Alpha , ,,. (Net) (PC1 > 1 0 i | j"l O ' * Oil * i * ... indicate that the discharge varies widely and is greatest shortly after heavy rains. ...

  16. TITLE

    Office of Legacy Management (LM)

    DC 20460 Annual Water Sampling and Analysis, Calendar Year 2001: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site ...

  17. Title

    Broader source: Energy.gov (indexed) [DOE]

    ... be addressed in future planning processes) - Focus on minimizing the exploration footprint (All projects will be evaluated based on minimizing environmental footprint) Strategic ...

  18. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    stand) * Black construction paper (one sheet per group of students) * Several books to prop thermometers * Metric ruler * Scissors * Stapler * Pencil * Student Record Sheets *...

  19. Title:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    about 2 centimeters of water in the bottom of the jar. Hold the black paper upright or prop it up against some books behind the jar. 3. Turn the lid of the jar upside down and...

  20. TITLE

    Office of Scientific and Technical Information (OSTI)

    Analysis of Memory Transfers and GEMM Subroutines on NVIDIA Tesla GPU Cluster Veerendra Allada, Troy Benjegerdes Electrical and Computer Engineering, Ames Laboratory Iowa State University Ames, IA, USA allada@iastate.edu, troy@scl.ameslab.gov Brett Bode National Center for Supercomputing Applications Urbana-Champaign, IL, USA bbode@ncsa.uiuc.edu Abstract-Commodity clusters augmented with application accelerators are evolving as competitive high performance com- puting systems. The Graphical

  1. TITLE

    Office of Legacy Management (LM)

    Pages 12 and 13 are unavailable Appendix B is unavailable

  2. <Title>

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and data locality Luigi Iapichino Leibniz-Rechenzentrum (LRZ), Garching b. Mnchen, Germany Collaborators: V. Karakasis, N. Hammer, A. Karmakar (LRZ) in the framework of the...

  3. TITLE

    Office of Legacy Management (LM)

    ... U.S. Department of Energy U.S. Department of Energy, ... National Environmental Policy Act New Mexico Department ... nuclear explosions to stimulate natural gas production. ...

  4. TITLE

    Office of Legacy Management (LM)

    ... National Environmental Policy Act Remedial ... Department of Energy (DOE) studied the economic feasibility of stimulating the flow of natural gas by fracturing ...

  5. Title

    National Nuclear Security Administration (NNSA)

    ... three new programs. Section 3.1.4 provides further details on these new programs. * Green Energy Futures Park * Kistler Launch Facility (KLF) Work-for-others programs NNSANV ...

  6. Title

    National Nuclear Security Administration (NNSA)

    During tlic course of ecological studies con- ducted tit the Atomic Energy Commission test ... The Sal-'.- Thrasher (Orcoacuptea montannx). Green- tailed Towhce (Chlonirti chloruru), ...

  7. Title

    National Nuclear Security Administration (NNSA)

    This work was performed by EG&GEM for the United States Departments of Energy under ... individuals: David C. Anderson, Ron A. Green, Danny L. Rakestraw, and Cathy A. Wills. ...

  8. Title

    National Nuclear Security Administration (NNSA)

    ... PHOTOGRAPHS TAKEN AUGUST, 1991 BY E G 8 G ENERGY MEASUREMENTS, INC. TION ALLUVIAL FAN ... AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW ...

  9. Title

    National Nuclear Security Administration (NNSA)

    ... These include such species as: Mallard, Pintail, Green-winged Teal, Bufflehead, Ruddy ... RESUME The U. S. Energy Research and Development Administration's Nevada Test Site (NTS) ...

  10. Title

    National Nuclear Security Administration (NNSA)

    ... L , : L - C ' , . ; k ' v k Giles to the public (Smith, et al., 1980). The ... The Georgia Veterinarian, Vol. 24, No. 3. Smith, D. D., K. R. Giles and D. E. Bernhardt. ...

  11. Title

    National Nuclear Security Administration (NNSA)

    ... ZONE VALLEY, REESE RIVEB, AND SMITH: CREEK VALLET lone and Reese River Valleys were more ... The Paradise Range which bounds lone Valley and the Desatoya Mountains which bound Smith ...

  12. Title

    National Nuclear Security Administration (NNSA)

    ... Photo 28 (Photo YM-196) Etfie Smith (Las Vegas Indian Center) at Stte 15 . 89 Photo 29 ... .91 Photo 33 (Photo YM-8) Edward THo" Smith (Chemehuevi) Holds Examples of the Lrthic ...

  13. Title

    National Nuclear Security Administration (NNSA)

    ... Observations of regional strain variations (Smith and Kind, 1972) from strain meters in ... The apparent lack of correlation of stress relaxation with seismic activity led Smith and ...

  14. Title

    National Nuclear Security Administration (NNSA)

    ... SYSTEM (17) 106 Antelope Valley 107 Smith Valley 108 Mason Valley 109 East Walker ... Valley 133 EDWARDS CREEK VALLEY (19) 134 SMITH CREEK VALLEY (20) 123 RAWHIDE FLATS (21) ...

  15. Title

    National Nuclear Security Administration (NNSA)

    ... Cattle As discussed by Gilbert et al. (1988) and in greater detail by Smith (1979), a ... These data are given by Smith (1979) and were used by Gilbert et al. (1988) to estimate ...

  16. Title

    National Nuclear Security Administration (NNSA)

    ... Especially does it reflect the efforts of James L. Reveal, University of Maryland and the Smith- sonian Institution, whose contributions began with the first intensive plant ...

  17. Title

    National Nuclear Security Administration (NNSA)

    ... Hamilton, R. M., B. E. Smith, F. G. Fischer, and P. J. Papanek, 1971. Seismicity of the ... Hamilton, R. M., B. E. Smith, J. C. H a l l , and J. H. HeaIy, 1969. Summary of Seismic ...

  18. Title

    National Nuclear Security Administration (NNSA)

    ... Additional evaluations include Bradshaw and Smith (1994), Connor and Hill (1994), Ho et al (1991), Smith et al (1990 and 1991), and Wells et al (1990). For facilities with siting ...

  19. Title

    National Nuclear Security Administration (NNSA)

    ... C. Eadie. 1976. "Parameters for Estimating the Uptake of Transuranic Elements. by Terrestrial Plants." USEPA Technical Note. ORPI.V 76-2. Brctthaucr, E. W. , P. B. Smith, A. .). ...

  20. Title

    National Nuclear Security Administration (NNSA)

    ... culminated in the environmental assessment studies recommending three candidate sites for further consideration: Hanford, Washington; Deaf Smith, Texas; and Yucca Mountain, Nevada. ...

  1. Title

    National Nuclear Security Administration (NNSA)

    ... from the soil and not through a food-web intermediary. 404 TRANSURANIC, ELEMENTS IN ... plutonium directly from the soil and to a lesser extent through a food-web intermediary. ...

  2. Title

    National Nuclear Security Administration (NNSA)

    20km i i i i t Fig. 14, Approximate location of boundary between Ash Meadows ground-water basin and Pahute Mesa ground.-water system, Nevada Test Site. -46- point out, however,...

  3. Title

    National Nuclear Security Administration (NNSA)

    ... MAXHID cm 10514 6911 525 25 20 5827 7721 21 71 9i2 16fi 271 262 PERU ID ... PERU ID cm 1 63 61 6026 3917 40 51 2113 196 41 20 61 51 40 30 ...

  4. TITLE

    Office of Legacy Management (LM)

    ... 19 4.1 Predictive Reliability and Postaudit ......that will affect the groundwater system reduces the reliability of future predictions. ...

  5. TITLE

    Office of Legacy Management (LM)

    ... this method show a high degree of reliability when compared with the hand-drawn version. ... a test of the reliability of the computer program in mapping irregularly rpaced data. ...

  6. TITLE

    Office of Legacy Management (LM)

    AMCHITKA BIOLOGICAL IWODlATION S J M U I i Y Prspard for tho U. S. Atoric Enrny C d a a i o n undmr Contract No. A T (26-11-171 MTTkUE Colrubua LaboratoriRa 505 Kirq A V R ...

  7. Title

    National Nuclear Security Administration (NNSA)

    ... measurements are lacking, the general climatic data and obser- vations on the climate and botany of NTS indicate that evapotranspiration equals or exceeds annual ...

  8. TITLE

    Office of Legacy Management (LM)

  9. TITLE

    Office of Legacy Management (LM)

  10. TITLE

    Office of Legacy Management (LM)

  11. TITLE

    Office of Legacy Management (LM)

    Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix.

  12. TITLE

    Office of Legacy Management (LM)

    Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix

  13. TITLE

    Office of Legacy Management (LM)

    , , - :. , L L b ' pi1 2 25. STATE OF MISSISSIPPI a . a . , i l l ; .. - . a ,-. , I , SALMON SITE , , , . . . C I A . - - 1 COUNTY OF LAMAR - T - TRACT NO. 101-E KNOW ALL MEN BY THESE PRESENTS, that, we, MARTHA T. BRIDGES alkla MARTHA TATUM BRIDGES LOPEZ, ROBERT TODD BRIDGES, MARTHA TATUM BRIDGES LOPEZ as Guardian of Nlchoias Carl Bridges, a minor, DIANA W. TATUM, NANCY 0. TATUM, and ADDISON T. TATUM, JR., alkla A. T. Tatum, Jr., whose addreas I s clo Mr. John Burnam, Post Office Box 1828,

  14. Title

    Energy Savers [EERE]

    ... Potential * Impacts - Better informed oceanclimate policy - Potential new domestic ... The Program Up to Now Setting the stage for current field activities * Initiated ...

  15. TITLE

    Office of Legacy Management (LM)

    ... Act BLM U.S. Bureau of Land Management CERCLA ... Test Site, Colorado Rulison Gas Stimulation Test Site, ... wet meadows, river overflows. mudflats. and natural ponds. ...

  16. TITLE

    Office of Legacy Management (LM)

    ... oil and gas development, and tourism comprise the present day economic resources of the area. The project land is ... stimulating the flow of natural gas by fracturing rock ...

  17. Title:

    Office of Scientific and Technical Information (OSTI)

    ... Phys Med Biol 1984; 29: 1537-1554. 8 . ' 21. Mijnheer BJ, Wootton P, Williams JR, Eenma J, Pamell, CJ. Uniformity in dosimetry protocols for therapeutic applications of fast ...

  18. Title

    National Nuclear Security Administration (NNSA)

    EASTERN PART OF JACKASS FLATS, NEVADA TEST SITE, SOUTHERN NEVADA By Rulon C. Christensen ... eastern Jackass Flats, Nevada Test Site, southern Nevada -:--* * In pocket Figure 1.'.' ...

  19. Title

    National Nuclear Security Administration (NNSA)

    Baseline vegetation contamination at safety test sites on the NTS and Tonopah Test Range. Describes concentrations of transuranics onin native vegetation sampled on NTS and TTR in ...

  20. Title

    National Nuclear Security Administration (NNSA)

    Noteworthy Mammal Distribution Records for the Nevada Test Site (RE: "Great Basin ... NOTEWORTHY M A M M A L DISTRIBUTION RECORDS FOR THE NEVADA TEST SITE Philip A. M.'clic-u' ...

  1. Title

    National Nuclear Security Administration (NNSA)

    Ecological studies of vertebrates in plutonium-contaminated areas of the Nevada Test Site ... of four Nevada Applied Ecology Group (NAEG) study areas of the Tonopah Test Range (TTR). ...

  2. Title

    National Nuclear Security Administration (NNSA)

    Geologic map of the Nevada Test Site, Southern Nevada. Geographic Features of NTS and upland Areas. Author Frizzell, Jr. V.A. and J. Shulters 101056 Document Date 1190 Document ...

  3. Title

    Broader source: Energy.gov (indexed) [DOE]

    ... that should be linked. * In the search results, click on the previous ... box will be blank. * Check the "Terms and Conditions" box and enter your FRPIN. * Click "Update Link." ...

  4. Title

    National Nuclear Security Administration (NNSA)

    of the water resources of the State and represents the water supply presently available to Nevada. Respectfully Poland D. Westergard State Engineer WATER FOR NEVADA yield. ...

  5. Title

    National Nuclear Security Administration (NNSA)

    Averages (1981-1967), October 56 I i i i i i i 12 15 18 21 24 Hour of Day MST Graph HI-24. Daily March of Wind Speed, 7-Year Averages (1961-1967), November 57 w -*-> o Ti O "S...

  6. Title

    National Nuclear Security Administration (NNSA)

    D bo a 10 12 15 18 21 24 Hour of Day MST Graph HI-20. Daily March of Wind Speed, 7-Year Averages (1 961-1967), July 53 Hour of Day MST. Graph ni-21. Daily March of Wind Speed,...

  7. TITLE

    Office of Legacy Management (LM)

  8. TITLE

    Office of Legacy Management (LM)

    III IIIIIIIIIIII~IIIIIIIIIIIIII 0001 05 CONTAMINATION ASSESSMENT RE PORT AMCHITKA ISUND ALEUTIAN ISUNDS. A U S K A Contract No. DACWBl-D-0003 Delivery Ordar No. 007 Prepared for: Mr. Dale Betry, Project Manager Engineering Project Management United States Army Corps of Engineers Alaska District Pouch 898 Anchorage, Alaska 99506-0898 ecology . and environment. ine. 1057 WEST FIREWEED LANE. ANCHORAGE. ALASKA 99603. TEL. 1 9 0 1 1 ZS7-5m(l hmmm& S p a d k r s n the Enmonmsm 7 " C W -I

  9. TITLE

    Office of Legacy Management (LM)

  10. TITLE

    Office of Legacy Management (LM)

  11. TITLE

    Office of Legacy Management (LM)

  12. TITLE

    Office of Legacy Management (LM)

  13. TITLE

    Office of Legacy Management (LM)

    Mi w u United S taies Office of Radiation a ~ d EPA 8 Environmental Protection Indoor Air Dcccmbcr 1999 Q Agency Washington, DC 304hC) EPA-402-R-93-0 12 Q w 0 4 : 0 0 0 4 &€PA Annual Water Samp and Analysis Ca endar Year 1999: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 1999 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site

  14. TITLE

    Office of Legacy Management (LM)

    902 GEN-BKS - - - . I 111 111 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l l Ill SHL 000024 United States Office of Radiation and EPA-402-R-94-001 Environmental Protection Indoor Air January 2004 Agency Washington, DC 20460 Annual Water Sampling and Analysis, Calendar Year 2003: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RI0 BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2003 SHOAL Test Site Area

  15. TITLE

    Office of Legacy Management (LM)

    OEce of Radiation and 12nvirorunentai Protection Indoor Ailr Washington., DC 20460 Annual Water Sampling and Analysis, Calendar Year 2000: R'ULISON Tes,t Site Area RLO BLANCO Test Site Area FAULTLESS Tes it Site Area SHOAL Test Site Area GASBUGGY Test Site, Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2000 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis

  16. TITLE

    Office of Legacy Management (LM)

    - . ' R U L 000003 United States Office of Radiation and ~ ~ ~ - 4 0 2 7 ~ - 0 2 - 0 0 7 Environmental Protection 1ndoor Air November 2002 Agency Washington, DC 20460 &EPA Annual Water Sampling and Analysis, Calendar Year 2002: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2002 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO

  17. TITLE

    Office of Legacy Management (LM)

    SHOAL AREA TRACER TEST EXPERlIMENT prepared by Rosemary Carrolt, Todd Mihevc, Greg Pohll, Brad Lyles, Sean Kosinski and Rich Niswonger submitted to Nevada Operations Office U.S. Department of Energy Las Vegas, Nevada NOVEMBER 2000 Publication No. 45177 Reference herein to any specific commercial pmduct, process, or service by trade name, trademark, mufacturer, or otherw~se, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or

  18. TITLE

    Office of Legacy Management (LM)

    ... available to man through the food web from areas likely to be contaminated if ... - Species should be part of the food web or indicators for a part of the food web ...

  19. TITLE

    Office of Legacy Management (LM)

    ... Although other radionuclides were identified by Smith (1997). they were not included in ... Although other radionuclides were identified by Smith (1997), they were not includcd in ...

  20. TITLE

    Office of Legacy Management (LM)

    ... David Prudic, a n d Sirous Djafari, David Smith, of Lawrence Livermore National Laboratory ... Three distinct zones are found in a complete cooIing unit after cooling (Smith. 1960; Ross ...

  1. TITLE

    Office of Legacy Management (LM)

    ... and A t m o s p h e r i c Administration, Air Reaourcea L a b o r a t o r i e s , L a s V ... i o n Agency Regional D i r e c t o r , Pollution C o n t r o l A d m i n i s t r a t i o ...

  2. Title

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... on thickeners * develop CO2-soluable surfactants to decrease mobility and increase viscosity of CO2. - Microwave conversion for EOR study * literature review of current state of ...

  3. Title

    National Nuclear Security Administration (NNSA)

    ... caldera complex are intercalated with the major ash flow sheet, from the complex, and analyses of the lavas fit well on compositional trends determined by the ash flow sheets. ...

  4. TITLE

    Office of Legacy Management (LM)

    TAKE- s - United States Department of' h e Interior - - FISH AND WII.,DLIFE SEKWC:E am I ... Thin lilt fulfills the Sequiroment of the Fish and wildlife service (Service) to provide a ...

  5. Title

    Gasoline and Diesel Fuel Update (EIA)

    Unlocking Energy Efficiency in the U.S. Economy 2010 Energy Conference EIA, SAIS April 7, 2010 McKinsey & Company | 1 Carbon emissions Gigatons CO 2 e * End-use consumption Quadrillion BTUs * Includes carbon emission abatement potential from CHP Source: EIA AEO 2008, McKinsey analysis Significant energy efficiency potential exists in the U.S. economy Industrial Residential Commercial -9.1 Baseline 2020 Baseline case, 2008 30.8 36.9 39.9 NPV- positive case, 2020 3.2 NPV- positive case, 2020

  6. Title

    National Nuclear Security Administration (NNSA)

    dating, and nomenclature of Mississippian rocks along these transects of the outer carbon- ate platform and Antler foreland basin are shown in five time-rock correlation charts...

  7. Title

    National Nuclear Security Administration (NNSA)

    ... A blank was processed in a similar manner and proved to be quite clean. The TEM samples ... substrate during .two long, unplanned storage periods at NTS. It was not possible to 1 ...

  8. TITLE

    Office of Legacy Management (LM)

    ... t a l a t o r a g e sheda, f o u r l i g h t standards, t h r e e e l e c t r i c a l panel boarda, one p i p e atanchion s e t i n a c o n c r e t e b a r e , two abandoned a e p ...

  9. TITLE

    Office of Legacy Management (LM)

    to install a second ground water treatment cell at the permeable reactive ... temperatu.re.---'---- High Temperature -.,.,----- Low Temperature Curre:gt barometric ...

  10. TITLE

    Office of Legacy Management (LM)

    * A second ground water treatment cell at the permeable ... 00" w TEMPERATURE (OF)' RAIN (in), WIND SPEED (mph) HEAT COOL AVG MEAN DEG DEG WIND DOM DAY TEMP HIGH TTME LOW TIME DAYS ...

  11. Title

    National Nuclear Security Administration (NNSA)

    ... The mobile system is mounted in a small van with a portable power supply and transported ... Vegetation appeared to be the most important influence fn decreasing wind-borne ...

  12. TITLE

    Office of Legacy Management (LM)

    Description of the Formerly Utilized Sites Remedial Action Program United States Department o f Energy "This book w l r prepartd u a n account 01 wo* lporuond by m uency o f the Unhd Sutes Govrrnmrnt. N a l h r t the United StalrsGovrrnment nos i n y m y lhumf, rm any 01 lheh employees, makes any .nrrmly, u p m r or impkd, or arrunrr my I@ LirbHty or rcsponiibiiily for ihe rccutrcy. wmplaenm. 01 u ~ l u l n e ~ i of any intotnulion, mppmtur, p f d u c t , 01 p r o m s d i ~ l o w d , or

  13. TITLE

    Office of Legacy Management (LM)

    VERIFICATIOH AND CERTIFICIITIOH PROTOCOL FOR ME OFFICE O f WIROHnMlAL RESTORATION FORMERLY UTILIZED SITES REHEDIAL ACTION PROSRAN IW DECOHTMIHATI OH AND DE?OWISSIONING P R O G M (Revision 3, Nowember, 1930) I L - I This p r o t o c o l o u t l i n e s the procedures f o r t h e v c r f f i c a t f o n and c e r t t f i c a t f o n o f remedi a1 a c t i o n projects p e r f ~ m e d under t h e Formerly Ut4lIzed S l t e s Remedial A c t i o n Program (FUSRRP) and p r o j e c t s performed under

  14. TITLE

    Office of Legacy Management (LM)

    , ,-- - < , - ' a 7. *: POST OFFICE BOX 2038 1; : . - - , . MANAGED BY M h M l N M A R I E l T A E N E l G Y S I S l E H S . INC. - .-- OAK RIDGE. TENNESSEE 37831 FOR THE U.S. DEPARTMEIIT OF EWEROI April 22, 1994 Dr. W. k Williams EM-421 Trwion n: Building Department of Energy Washington, D. C 20585-0002 Dear Dr. Williams: In a letter to you dated August 18, 1993, a summary of the initial radiological survey was provided with only limited inionnation regarding mncentratiom in soil samples and

  15. TITLE

    Office of Legacy Management (LM)

    Survey Results for Neigh boring Properties of the Alba Craft Site Oxford, Ohio U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Index / / { i s / . . ....................................................... s. Main s t r a e t f i o w e s 3 . . (~1-008,012-014,016) : : , . W . Rose Avenue Properties ............................... .:. ........... I . . .97 (017) Linden Street Properties .................................................... 103 (010-011) Municipd Landfill h

  16. TITLE

    Office of Legacy Management (LM)

    amv. I.. - - DESlON CRITERIA FOR f ORMERLV UTILIZISU 81TEb REMEDIAL ACTIUN PROORAM [FUmRAP) AND BURPLUS FACILITIES MANAOEMENT D E S I G N C R I T E R I A POR FORMERLY U T I L I Z E D S I T E S REHEDIAL ACTION PROGRAM (?USRAP). AlPD SURPLUS FACILITIES MUINAGEHEIT P R O C R U (SFHP) ( I S S U E D FOR C L I E N T APPROVAL) FEBRUARY 1 9 8 6 ~pproved by: a . CI, Director 2- 24-86 Date T e c h n i c a l Services Division Oak RiPge Operations Office Approved by: 2-24-86 Date Construction and E n g i n

  17. TITLE

    Office of Legacy Management (LM)

    LABORATORY 9700 South Cass Avenue, A q o m e , Illinob 60159 ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THE ALBANY RESEARCH CENTER, ALBANY, OREGON June 1987 U.S. DEPARTMENT OF ENERGY Oak Rice Operatlorn Technical Services Division Oak Ridge, Tennessee 1 SUMMARYOFPROPOSEDACTION ........................................ 1 2 f I l S M R Y AND NEED FOR ACTION ....................................... 2 1 GeneralSttti np ...................................................... 2 2.3 History

  18. TITLE

    Office of Legacy Management (LM)

    Distribution Category: Remedial Action nnd Ikco~issioning Progrnm (UC- 70A) A R - HhTIOaAL lABORlrTORY 9700 South Cnss Avenue Arsoune, Illinois 60439 Prepared bp R. A. Uynveen Associate Division Director, OHS W. H. Smith Senior Health Physicist C. . Sholeen Health Physicist A. L. Just- liealth Physicist K. F. Flynn Eealth Phymicist hdiologicnl Sumey Group Health Physics Section O c c u p n t i o ~ l Bealth and Safety Division June 1983 Work Performed under Budget Activity WE m-03-60-40 and AUL

  19. TITLE

    Office of Legacy Management (LM)

    7 9 3 2 0 ?. . .. ~ - 1 -<. $ 2 . DOVOW21 949-279 ~ : & . ' r; . ( i i . :.a . - l i Formerly Utilized Sites Remedial Action Program (FUSRAP) : ! Contract No. DE-AC05-91 OR21 949 $ * i -> Community Relations Plan . .!. I - for a Removal Action , - 1 . i at the Albany Research Center Site . 1 - July 1991 U.S. Department of Energy DOE Field Office, Oak Ridge Formerly Utilized Sites Remedial Action Program COMMUNITY RELATIONS PLAN FOR THE ALBANY RESEARCH CENTER SITE ALBANY, OREGON JULY 1

  20. TITLE

    Office of Legacy Management (LM)

    ENGINEERING EVALUATION O F SELECTED REMEDIAL ACTION ALTERNATIVES FOR THE ALBANY RESEARCH CENTER, ALBANY, OREGON J U N E 1 9 8 5 Prepared for UNITED STATES DEPARTMENT O F ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 Bechtel National, InC. Advanced Technology Division Oak Ridge, Tennessee Bechtel J o b No. 14501 SPECIAL NOTE This Preliminary Engineering Evaluation of Selected Remedial Action Alternatives (EEA) was originally prepared in early 1984. In the EEA, three

  1. TITLE

    Office of Legacy Management (LM)

    REMEDIAL A C T I O N WORK P L A N FOR THE ALBANY RESEARCH CENTER FEBRUARY 1 9 8 7 U N I T E D STATES DEPARTMENT OF ENERGY OAK R I D G E O P E R A T I O N S T h i s document p r o v i d e s g e n e r a l i n f o r m a t i o n about t h e Department of Energy's remedial a c t i o n program a t t h e Albany Research Center, Albany, Oregon. A d d i t i o n a l i n f o r m a t i o n i s a v a i l a b l e from t h e Department of Energy, T e c h n i c a l S e r v i c e s D i v i s i o n , P o s t O f

  2. TITLE

    Office of Legacy Management (LM)

    September 1989 Sechtel National, Inc. HAZARD ASSESSMENT FOR RADIOACTIVE CONTAMINATION IN AND BENEATH CERTAIN BUILDINGS AT THE ALBANY RESEARCH CENTER ALBANY. OREGON SEPTEMBER 1989 Prepared for UNITED STATES DEPRRTHENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 BY H . E. Kaye, J. H . Wright, D. G. Adler, and W. F. Stanley Bechtel National. Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 TABLE OF CONTENTS List of Figures ..............................................

  3. TITLE

    Office of Legacy Management (LM)

    ADDENDUM TO THE HAZARD ASSESSMEHT FOR RADIOACTIVE CONTAnINATION IN AND BENHATB CERTAIN BUILDINGS AT TBE ALBANY RESBARCH CKNTER ALBANY, OREGON MARCH 1992 Prepared for United States Department of Energy Oak Ridge Field Office Under Contract No. DE-AC05-910R2 19 49 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 Page F i g u r e s . . . . . . . . . . . . . . . . . . . . . . . . . . i v T a b l e s . . . . . . . . . . . . . . . . . . . . . . . . . . i v Acronyms . . . . . . . . . .

  4. TITLE

    Office of Legacy Management (LM)

    Bechtel Inferoffice Memorandum TO G. L. Palau Subject Scoping Notice:' Former Associate Aircraft Tool and Manufacturing., Inc . Site, Fairf ield, Ohio copies to T. E. Morris G. R. Gale W & J. S. Allison File No. 7440/124 Date November 1, 1994 Frcm D. D. Sexton MS of ES &H ~t Oak Ridge ~ x t . 4-3643 SCOPING NOTICE INTRODUCTION The purpose of this scoping notice is to formalize the identification and application of federal and state rules and regulations that may apply to the cleanup of

  5. TITLE

    Office of Legacy Management (LM)

    Departmentaof ~ n e r ~ ~ Washington, DC 20585 IdkY O 3 1993 Mr. James Besl President Force Control Industries 3660 D i x i e Hrghway F a i r f i e l d , Ohio 45014 Dear M r . Besl : This i s t o n o t i f y you t h a t the U.S. Oepartlaent o f Energy (WE) has designated the former Associate A i r c r a f t Tool and Manufacturing Company s i t e i n F a i r f i e l d , Ohio, f o r remedial a c t i o n as a p a r t o f the Formerly U t i l i z e d Sttes Remedial Action Program. Remedial a c t i v

  6. TITLE

    Office of Legacy Management (LM)

    Distribution Subject EIN: Ohio Hazardous Waste Regulations Copier t o G. R. Galen G. L. Palau F i l e No. 7440/124, 135 ate January 10, 1995 Frm D. D. Sexton TDS of ES&H ~t Oak Ridge ~ x t . 4-3643 BACKGROUND This Environmental Information Notice (EIN) provides detailed regulatory guidance concerning compliance with the Ohio Hazardous Waste Code. This EIN is based on research of the Ohio Administrative Code (OACI and conversations of a generic nature with the federal Environmental Protection

  7. TITLE

    Office of Legacy Management (LM)

    ~overnment Department of Energy Oak Ridge Operations Office memorandum DATE: January 19. 1995 SUBIECT: USE OF EXEHPTIOW FROW DEPhRTnEKl OF ENERGY ORDER 5820.2A F O R RADIOhCTIVE WASTE FROn FUSlUl To: James A. Turi , Director, O f f i c e o f Program Support, O f f i c e o f the Deputy Assistant Secretary Waste Clanagelent, M-33, TREY I I This m r a n d u n serves t o n o t i f y 01-33 o f the F o m r l y U t i l i z e d Sites Remedial Action Program's (FUSRAP] i n t e n t t s dispose o f

  8. TITLE

    Office of Legacy Management (LM)

    FORCE CONTROL INDUSTRIES,'INC. 1 2 3 0 7 2 CONTROL %60 Dixie Hwy.. Zip 45014 P.O. Box l a . Z p 45018 11W b l e . Sule F Failfield. Ohio T w M i g a n a8083 Phone: (513) 868-0900 Phone: !B10) 52441= FAX. (513) 868-2105 F . U i81C.l 52d-1208 C,ir Shear Clutch & Brake Systems November 10.1994 U. S. Deparbnent of Energy Oak Ridge Operations office Ann: AD-424, Katy Kates P.O. Box 2001 Oak Ridge, TN 37831 Dear Ms. Kates, In furtherance of the August 24,1994 letter from Doug Shook, his subsequent

  9. TITLE

    Office of Legacy Management (LM)

    R i i e . Tennessee 37831 -8723 J u l y 18, 1995 Mr. Graham H i t c h e l l , Environmental Manager Ohio Envi r o n e n t a l Protection llgency Southwest O I s t r i c t O f f l c e 40 South H r i n Street Dayton, Ohio 45402 Dear Hr. M i t c h e l l : MUMD hSSESSHEKT FOR RESIDUAL COHTMINATION AT THE FORMER CISSOClATE AIRCRAFT SITE ( M S ) Enclosed i s a copy of the Hazard Assessment t h a t was performed f o r the Former Associate A i r c r a f t S i t e (MS) fn F a i r f i e l d , Ohio. In

  10. TITLE

    Office of Legacy Management (LM)

    State of ohlo Env~ronmental Protectton Agency PROVISIONAL ID NUMBER O H P

  11. TITLE

    Office of Legacy Management (LM)

    / m - 1 2 0 6 7 4 Department of Energy Oak Ridge *rations P.O. Box 2001 Oak Ridge, Tennessee 37831-8723 September 19, 1994 Hr. Saul Gleiser Ohio H i s t o r i c a l Society H i s t o r i c Preservation D i v i s i o n 1982 Yelma Avenue Columbus, Ohio 43211-2497 Dear Mr. Gleiser: ASSOCIATE AIRCRAFT SITE - NHPA (SECTION 106) DETERHINATION I n accordance w i t h Section 106 o f the National H i s t o r i c Preservation Act (NHPA), the Department o f Energy (WE) has determined t h a t the proposed

  12. TITLE

    Office of Legacy Management (LM)

    O Distribution pile 10. 7 4 4 0 / 1 2 4 , 135 s & ; ~ t EIN: Ohio ~azardous D ~ I C February 6 . 1995 Waste Regulat ions; Empty Container Rule ~ r - D . D. Sexton C-ics lo T. E. Morris& G. R. Galen G . L. Palau This Environmental Informat ion Notice ( E I N ) provides regulatory guidance concerning compliance with the Ohio Hazardous Waste regulations for residues of hazardous waste in empty containers or inner liners Ie.g.. the Empty Container Rule). This EIN is based on research and

  13. TITLE

    Office of Legacy Management (LM)

    Nationd Laboratory 9700 South Cass Avenue, Argonne, IUinois 60439 DERIVATION OF GUIDELINES FOR UaANIUbi RESIDUAL &ADIOACTIVE MATERIAL M 801L AT THE FORMER - U T E AIRCRAFT TOOL AND m A C l ' U I U N C COMPANY SlTE, FAIRFIELD, OHIO E.R. Faillace, M . Nimmagadda, and C . Yu Environmental Assessment Division January 1995 work sponsonxl by U.S. Department of Energy OMice of Environmental Restoration Washington, D.C. CONTENTS NOTATION ......................................................... v

  14. TITLE

    Office of Legacy Management (LM)

    -. i . , . United States Government L-u+-tw / S / V ~ f Department of nersy memorandum D i T E June 0 5 , 1995 FEP-Y ATTK OF: EM-421 (U. A. Williams, 301-903-8149) SUGJECT Hazard Assessmnt f o r Radioactive Contamination a t the Associate. A i r c r a f t Site, F a i r f i e l d , Ohio To L. Price, OR This memorandum i s t o ' provide comments and approval o f the Associate i r ft i t n f o r e n ' i A r c a S eHazardAssessmet I d t i f e d S o i l C ~ m i n a t i o n . The hazard assessment was

  15. TITLE

    Office of Legacy Management (LM)

    Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler:

  16. TITLE

    Office of Legacy Management (LM)

    RIDOH NArnONAL LABORATORY c- Results of the Independent Radiological Verification Survey I.* K . . . . 1 A . T I r n * at the Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio - (FOH001) D . E . Rice M . E . Murray K. S . Brown EEALTH SCIENCES RESEARCH DMSION E ' * I ~ m d w a s k M ~ t ~ ~ ~ ( ~ N o . E X Z D 2 0 0 1 O; AB131DM) Aircraft ~ o o l and Manrlaet~ring Company Site, Fiirfleld, Oh10 (FOH001) D. E. Rice, M. E. Mumy, K:S. Brown . . . . lmza@am Tam R D.

  17. TITLE

    Office of Legacy Management (LM)

    .-, EFZ. lor-%., United States Governmerit memorandum DATE: FEB 2 1 1991 MEPLY TO EM- 421 ATTN OF: SUBJECT: A u t h o r i t y Determination--8&T Metals i n Columbus, Ohio TO: The F i l e The attached review documents the basis f o r determining whether DOE has a u t h o r i t y f o r t a k i n g remedial a c t i o n a t the BaT Metals f a c i l i t y i n Columbus, Ohio, under the Formerly U t i 1 ized Sites Remedi a1 Action Program (FUSRAP). The B&T Hetals f a c i l i t y was used by the

  18. TITLE

    Office of Legacy Management (LM)

    p a * T A olistii. ..ow ... Unlted States awernment 00))#~Tmsnt of Energy - - memorandum D*=APR 0 2 1987 muym NE-23 A m OR W C I : Revised Guidelines f o r Resldual R a d ~ o a c t i v e M a t e r i a l a t N S R A P and R e m t e SRIP S l t e s Ahrends, OR Kluk, OP-124 Nelson, WSSPd Schrelber , SSDPD Welty, EH-23 G I l b e r t , MIL Berven, ORHL Berger, ORAL! Young, Aerospace Attached I s a revjsed copy o f thc Department's Guidelines f o r n s l d u a l r a d l o a c t f v e material. This

  19. TITLE

    Office of Legacy Management (LM)

    ~ ~erivation of ~uidelines for Uranium Residual Radioactive Material in soil at the B&T Metals Company Site, Columbus,. Ohio Environmental Assessment Division f i Argonne National Laborgory Operated by The Unlvenlty of ChCago. under Contract w-31-109-Eng-38, lor tne United States Department of Energy Derivation of Guidelines for Uranium Residual Radioactive Material in Soil at the B&T Metals Company Site, Columbus, Ohio by S. Kamboj. M. Nimmagadda, and C. Yu Env~ronmental Assessment

  20. TITLE

    Office of Legacy Management (LM)

    T O G. L. Palau Subject Scoping Notice: The B&T Metals Site, Columbus, Ohio F i l s No. 744011 13 ~ a t t February 26, 1996 F P m l D. D. Sexton b of Environmental Compliance EX^. Oak Ridge ~t 4-3643 BACKGROUND The purpose of this Scoping Notice is to formalize the identification and evaluate the application of federal and state rulcs and regulations that apply to the cleanup of the B&T Metals site, located in Columbus, Ohio. This environmental compliance evaluation is based on

  1. TITLE

    Office of Legacy Management (LM)

    e ~ a r t m e n t of Energy Oak Ridge Operations P.O. Box 2001 Oak Ridge. Tennessee 37831- November 7, 1995 Dave To1 b e r t B&T Metals Company & B&T F l o o r Company P. 0 . Box 163520 Columbus, Ohio 43216-3520 Dear M r . To1 b e r t : REAL ESTATE LICENSE REORDOER-7-96-0103, B&T METALS COHPANY, COLUMBUS, OH Enclosed f o r your records i s a copy o f the f u l l y executed 1 icense between B&T Metals Company and the Department o f Energy. Is t h e separate l i c e n s e f o

  2. TITLE

    Office of Legacy Management (LM)

    2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information

  3. TITLE

    Office of Legacy Management (LM)

    Date: 11/21/35 10:12:16 AM 136930 From: HARTMANGSOoro.doe.gov Subject: Re: CX Determination - B&T Metals Removal Action (FUSRAP-036 HOW about this! This is the first CX determination that we have done electronically - - - same-day turnaround!!! Gary Forwarding routing: Les Price, PSRD Bill Seay, FSRD Dave Adler, PSRD Loren Marz, PSRD Gerry Palau. BNI Dave Sexton, BNI Teresa Noe, BNI (PDCC) Forward Header :~Liject: Re: CX Determination - B&T Metals Removal Action (PUSPAP-036 i~thor:

  4. Title

    National Nuclear Security Administration (NNSA)

    Anita G. Harris Branch of Paleontology and Stratigraphy U. S. Geological Survey National ... km of Yucca Mountain in 1991. Cqnodont samples from two of these hew wells and 190 ...

  5. TITLE

    Office of Legacy Management (LM)

    H Heat distribution in the Cannikin cnwry I 1 Water quality of the Cennikin.perturbed ... If a @ven amount of heat is transfer. chimney was still 23 ft (7.0 m) below the potential ...

  6. Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utah, Nevada, and California BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several other...

  7. Impending impacts of Title III and Title V of the Clean Air Act Amendments of 1990 on the coal industry

    SciTech Connect (OSTI)

    Kerch, R.L.

    1994-12-31

    The coal industry has already begun to feel the affects of the acid deposition title, particularly in Illinois. Two challenges to the producers and sellers of coal; i.e., (1) Title III, Hazardous Air Pollutants and what is in store for customers, and (2) Title V, Operating Permits, which may affect production facilities are discussed. The utilities are temporarily exempted from Title III. The Great Waters report suggests that mercury will be regulated, and it looks like risk assessments will be based on coal analysis rather than on actual emission measurements. Stack sampling is difficult, expensive and slow. Coal cleaning is important in reducing trace elements. Electrostatic precipitators also remove trace elements. ESPs are less effective for mercury and selenium because they are emitted in the gas phase. FGD can remove hazardous air pollutants, but it is not well documented.

  8. G Subject: Implementation of Division B, Title III, Title V and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    G Subject: Implementation of Division B, Title III, Title V and Division C Title VII, ... incremental funding and funding terms of grant and cooperative agreement awards (e.g. ...

  9. Sandia National Laboratories: Page Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facebook Twitter YouTube Flickr RSS Pulsed Power Publications *only first authors listed 2015 Author Title Journal Volume Apruzese, JP Radiation Transport in Z-Pinches IEEE Transactions on Plasma Science 93 Awe, TJ Experimental Studies of Instability Development in Magnetically Driven Systems NNSA Stockpile Stewardship Quarterly 5 Bailey, JE A higher-than-predicted measurement of iron opacity at solar interior temperatures Nature International Weekly Journal of Science 517 Bennett, N The impact

  10. Improving CSE Software through Reproducibility Requirements. (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Improving CSE Software through Reproducibility Requirements. Citation Details In-Document Search Title: Improving CSE Software through Reproducibility Requirements. Abstract not provided. Authors: Heroux, Michael Allen Publication Date: 2011-02-01 OSTI Identifier: 1109282 Report Number(s): SAND2011-1158C 471476 DOE Contract Number: AC04-94AL85000 Resource Type: Conference Resource Relation: Conference: 4th International Workshop on Software Engineering for Computational

  11. Title XVII Final Rule | Department of Energy

    Energy Savers [EERE]

    Final Rule Title XVII Final Rule PDF icon Title XVII Final Rule More Documents & Publications Final Rule (December 4, 2009) Notice of Proposed Rulemaking (August 6, 2009) Final Rule (October 23, 2007)

  12. Title 23 CCR Waters | Open Energy Information

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 23 CCR WatersLegal Abstract California Code of Regulations, Title 23 Waters, sections...

  13. Browse Designations - DOE Directives, Delegations, and Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SciTech Connect Brown Grease to Biodiesel Demonstration Project Report Citation Details In-Document Search Title: Brown Grease to Biodiesel Demonstration Project Report Municipal wastewater treatment facilities have typically been limited to the role of accepting wastewater, treating it to required levels, and disposing of its treatment residuals. However, a new view is emerging which includes wastewater treatment facilities as regional resource recovery centers. This view is a direct result

  14. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    SciTech Connect (OSTI)

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  15. International shock-wave database project : report of the requirements workshop.

    SciTech Connect (OSTI)

    Aidun, John Bahram; Lomonosov, Igor V.; Levashov, Pavel R.

    2012-03-01

    We report on the requirements workshop for a new project, the International Shock-Wave database (ISWdb), which was held October 31 - November 2, 2011, at GSI, Darmstadt, Germany. Participants considered the idea of this database, its structure, technical requirements, content, and principles of operation. This report presents the consensus conclusions from the workshop, key discussion points, and the goals and plan for near-term and intermediate-term development of the ISWdb. The main points of consensus from the workshop were: (1) This international database is of interest and of practical use for the shock-wave and high pressure physics communities; (2) Intermediate state information and off-Hugoniot information is important and should be included in ISWdb; (3) Other relevant high pressure and auxiliary data should be included to the database, in the future; (4) Information on the ISWdb needs to be communicated, broadly, to the research community; and (5) Operating structure will consist of an Advisory Board, subject-matter expert Moderators to vet submitted data, and the database Project Team. This brief report is intended to inform the shock-wave research community and interested funding agencies about the project, as its success, ultimately, depends on both of these groups finding sufficient value in the database to use it, contribute to it, and support it.

  16. ARM Operations Quarterly Report October 1-December 31, 2013 (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Technical Report: ARM Operations Quarterly Report October 1-December 31, 2013 Citation Details In-Document Search Title: ARM Operations Quarterly Report October 1-December 31, 2013 The U.S. Department of Energy requires national user facilities to report time-based operating data. This quarterly report is written to comply with this requirement. This reports on the first quarter facility statistics. Authors: Voyles, Jimmy W. [1] + Show Author Affiliations Pacific

  17. Technology and Research Requirements for Combating Human Trafficking: Enhancing Communication, Analysis, Reporting, and Information Sharing

    SciTech Connect (OSTI)

    Kreyling, Sean J.; West, Curtis L.; Olson, Jarrod

    2011-03-17

    DHS Science & Technology Directorate directed PNNL to conduct an exploratory study on the domain of human trafficking in the Pacific Northwest in order to examine and identify technology and research requirements for enhancing communication, analysis, reporting, and information sharing activities that directly support efforts to track, identify, deter, and prosecute human trafficking including identification of potential national threats from smuggling and trafficking networks. This effort was conducted under the Knowledge Management Technologies Portfolio as part of the Integrated Federal, State, and Local/Regional Information Sharing (RISC) and Collaboration Program.

  18. Research Highlights Sorted by Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J. A Bulk Parameterization of Giant

  19. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

  20. Title XVII-Innovative Technology Loan Guarantee Program under ARRA |

    Energy Savers [EERE]

    Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice

  1. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    SciTech Connect (OSTI)

    2000-08-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

  2. The United States Code - Printing, Title 44 Excerpts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The United States Code - Printing, Title 44 Excerpts The United States Code - Printing, Title 44 Excerpts The United States Code - Printing, Title 44 Excerpts PDF icon The United ...

  3. High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment report

    SciTech Connect (OSTI)

    Biebesheimer, E., Westinghouse Hanford Co.

    1996-09-30

    This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Report for the subject facility, represents the results of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. It contains; compliance status, remedial actions, and an implementing manuals report linking S/RID elements to requirement source to implementing manual and section.

  4. TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OF ELECTRICITY GRID | Department of Energy TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID Energy Independence and Security Act of 2007 - SEC. 1301 - 1308 PDF icon TITLE XIII- SMART GRID SEC. 1301- 1308 STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID More Documents & Publications 2009 Smart Grid System Report (July 2009) Energy Policy

  5. Needs and Requirements for Future Research Reactors (ORNL Perspectives)

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Technical Report: Needs and Requirements for Future Research Reactors (ORNL Perspectives) Citation Details In-Document Search Title: Needs and Requirements for Future Research Reactors (ORNL Perspectives) The High Flux Isotope Reactor (HFIR) is a vital national and international resource for neutron science research, production of radioisotopes, and materials irradiation. While HFIR is expected to continue operation for the foreseeable future, interest is

  6. Requirements for a Dynamic Solvent Extraction Module to Support Development

    Office of Scientific and Technical Information (OSTI)

    of Advanced Technologies for the Recycle of Used Nuclear Fuel (Technical Report) | SciTech Connect Technical Report: Requirements for a Dynamic Solvent Extraction Module to Support Development of Advanced Technologies for the Recycle of Used Nuclear Fuel Citation Details In-Document Search Title: Requirements for a Dynamic Solvent Extraction Module to Support Development of Advanced Technologies for the Recycle of Used Nuclear Fuel The Department of Energy's Nuclear Energy Advanced Modeling

  7. Implementation of Division D, Titles III and V, and Division...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and guidance for Division D, Titles III and V, and Division E, Title VII of the ... Implementation of Division D, Titles III and V, and Division E, Title VII of the ...

  8. Report on the Depth Requirements for a Massive Detector at Homestake

    SciTech Connect (OSTI)

    Bernstein,A.; Blucher, E.; Cline, D. B.; Diwan, M. V.; Fleming, b.; Kadel, R.; Kearns, E.; Klein, J.; Lande, K.; Lanni, F.; Lissauer, D.; McKeown, R.; Morse, W.; Radeika, R.; Scholberg, K.; Smy, M.; Sobel, H.; Sullivan, G.; Svoboda, R.; Vagins, M.; Walter, C.; Zwaska, R.

    2008-12-22

    This report provides the technical justification for locating a large detector underground in a US based Deep Underground Science and Engineering Laboratory. A large detector with a fiducial mass greater than 100 kTon will most likely be a multipurpose facility. The main physics justification for such a device is detection of accelerator generated neutrinos, nucleon decay, and natural sources of neutrinos such as solar, atmospheric and supernova neutrinos. The requirement on the depth of this detector will be guided by the rate of signals from these sources and the rate of backgrounds from cosmic rays over a very wide range of energies (from solar neutrino energies of 5 MeV to high energies in the range of tens of GeV). For the present report, we have examined the depth requirement for a large water Cherenkov detector and a liquid argon time projection chamber. There has been extensive previous experience with underground water Cherenkov detectors such as IMB, Kamioka, and most recently, Super-Kamiokande which has a fiducial mass of 22 kTon and a total mass of 50 kTon at a depth of 2700 meters-water-equivalent. Projections for signal and background capability for a larger and deeper (or shallower) detectors of this type can be scaled from these previous detectors. The liquid argon time projection chamber has the advantage of being a very fine-grained tracking detector, which provides enhanced capability for background rejection. In the current work we have taken the approach that the depth should be sufficient to suppress the cosmogenic background below predicted signal rates for either of the above two technologies. Nevertheless, it is also clear that the underground facility that we are examining must have a long life and will most likely be used either for future novel uses of the currently planned detectors or new technologies. Therefore the depth requirement also needs to be made on the basis of sound judgment regarding possible future use. In particular, the depth should be sufficient for any possible future use of these cavities or the level which will be developed for these large structures. Along with these physics justifications there are practical issues regarding the existing infrastructure at Homestake and also the stress characteristics of the Homestake rock formations. In this report we will examine the various depth choices at Homestake from the point of view of the particle and nuclear physics signatures of interest. We also have sufficient information about the existing infrastructure and the rock characteristics to narrow the choice of levels for the development of large cavities with long lifetimes. We make general remarks on desirable ground conditions for such large cavities and then make recommendations on how to start examining these levels to make a final choice. In the appendix we have outlined the initial requirements for the detectors. These requirements will undergo refinement during the course of the design. Finally, we strongly recommend that the geotechnical studies be commenced at the 4850 ft level, which we find to be the most suitable, in a timely manner.

  9. Report on the Depth Requirements for a Massive Detector at Homestake

    SciTech Connect (OSTI)

    Kadel, Richard W.; Bernstein, Adam; Blucher, Edward; Cline, David B.; Diwan, Milind V.; Fleming, Bonnie; Kearns, Edward; Klein, Joshua; Lande, Kenneth; Lanni, Francesco; Lissauer, David; McKeown, Robert; Morse, William; Rameika, Regina; Scholberg, Kate; Smy, Michael; Sobel, Henry; Sullivan, Gregory; Svoboda, Robert; Vagins, Mark; Walter, Christopher; Zwaska, Robert

    2008-12-23

    This report provides the technical justification for locating a large detector underground in a US based Deep Underground Science and Engineering Laboratory. A large detector with a fiducial mass greater than 100 kTon will most likely be a multipurpose facility. The main physics justification for such a device is detection of accelerator generated neutrinos, nucleon decay, and natural sources of neutrinos such as solar, atmospheric and supernova neutrinos. The requirement on the depth of this detector will be guided by the rate of signals from these sources and the rate of backgrounds from cosmic rays over a very wide range of energies (from solar neutrino energies of 5 MeV to high energies in the range of hundreds of GeV). For the present report, we have examined the depth requirement for a large water Cherenkov detector and a liquid argon time projection chamber. There has been extensive previous experience with underground water Cherenkov detectors such as IMB, Kamioka, and most recently, Super-Kamiokande which has a fiducial mass of 22 kTon and a total mass of 50 kTon at a depth of 2700 meters-water-equivalent in a mountain. Projections for signal and background capability for a larger and deeper(or shallower) detectors of this type can be scaled from these previous detectors. The liquid argon time projection chamber has the advantage of being a very fine-grained tracking detector, which should provide enhanced capability for background rejection. We have based background rejection on reasonable estimates of track and energy resolution, and in some cases scaled background rates from measurements in water. In the current work we have taken the approach that the depth should be sufficient to suppress the cosmogenic background below predicted signal rates for either of the above two technologies. Nevertheless, it is also clear that the underground facility that we are examining must have a long life and will most likely be used either for future novel uses of the currently planned detectors or new technologies. Therefore the depth requirement also needs to be made on the basis of sound judgment regarding possible future use. In particular, the depth should be sufficient for any possible future use of these cavities or the level which will be developed for these large structures.Along with these physics justifications there are practical issues regarding the existing infrastructure at Homestake and also the stress characteristics of the Homestake rock formations. In this report we will examine the various depth choices at Homestake from the point of view of the particle and nuclear physics signatures of interest. We also have sufficient information about the existing infrastructure and the rock characteristics to narrow the choice of levels for the development of large cavities with long lifetimes. We make general remarks on desirable ground conditions for such large cavities and then make recommendations on how to start examining these levels to make a final choice. In the appendix we have outlined the initial requirements for the detectors. These requirements will undergo refinement during the course of the design. Finally, we strongly recommend that the geotechnical studies be commenced at the 4850 ft level, which we find to be the most suitable, in a timely manner.

  10. Changes to the Reporting Requirements for Contracts Funded by the American Recovery and Investment Act of 2009 (Recovery Act)

    Broader source: Energy.gov [DOE]

    The reporting requirements for contracts funded by the Recovery Act at Federal Acquisition Regulation (FAR) 52.204-1 1 have been changed. The reporting requirements now require first tier subcontractors to provide jobs information to the prime contractor for reporting into www.FederalReporting.gov. While the clause applicability is for all new solicitations and contracts issued on or after July 2,201 0, reporting of subcontractor job information is beneficial to the transparency of Recovery Act programs and Contracting Officers are asked to incorporate the revised clause into contracts funded by the Recovery Act as soon as practicable. In addition, contractors should be informed of the change and asked to submit this information for the reports due this month, if possible.

  11. Implementation plan for Title 40 Code of Federal Regulations Parts 280 and 281; Final rules for underground storage tanks

    SciTech Connect (OSTI)

    Stupka, R.C.

    1989-04-01

    This report presents the schedules and methods required to comply with the newly promulgated Underground Storage Tank (UST) Regulations Title 40 Code of Federal Regulations (CFR) 280 and 281. These rules were promulgated by the US Environmental Protection Agency (EPA) on September 23, 1988, and became effective December 22, 1988. These regulations are required by Subtitle I of the Resource Conservation and Recovery Act of 1976. Their purpose is to protect the groundwater supplies of the United States in the following ways: Closing old tanks; detecting and remediating tank leaks and spills; establishing stringent standards for new tanks; and upgrade of existing tanks to new-tank standards. 3 refs., 5 tabs.

  12. Title III list of lists: Consolidated list of chemicals subject to the Emergency Planning and Community Right-to-Know Act (EPCRA) and section 112(r) of the Clean Air Act, as amended. Title III of the Superfund Amendments and Reauthorization Act of 1986, and Title III of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The consolidated chemical list includes chemicals subject to reporting requirements under Title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA), also known as the Emergency Planning and Community Right-to-Know Act (EPCRA), and chemicals listed under section 112(r) of Title III the Clean Air Act (CAA) Amendments of 1990. This consolidated list has been prepared to help firms handling chemicals determine whether they need to submit reports under sections 302, 304, or 313 of SARA Title III (EPCRA) and, for a specific chemical, what reports may need to be submitted. Separate lists are also provided of Resource Conservation and Recovery Act (RCRA) waste streams and unlisted hazardous wastes, and of radionuclides reportable under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). These lists should be used as reference tool, not as a definitive source of compliance information. The chemicals on the consolidated list are ordered by Chemical Abstract Service (CAS) registry number. Categories of chemicals, which do not have CAS registry numbers, but which are cited under CERCLA, EPCRA section 313, and the CAA, are placed at the end of the list. More than one chemical name may be listed for one CAS number, because the same chemical may appear on different lists under different names.

  13. Flyer, Title VI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flyer, Title VI Flyer, Title VI Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance. This flyer explains this probition, and can be downloaded and displayed at your place of work. PDF icon discrimination flyer July 2011.pdf More Documents & Publications NO FEAR Act Notice DOE F 1600.5 DOE F 1600.1

  14. No Slide Title | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Title More Documents & Publications Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation Documentation: Pre-negotiation Plan & the Price Negotiation Memorandum Chapter 71 -...

  15. Categorical Exclusion Determination Form Proposed Action Title...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Action Title: (0473-1597) Smart Wire Grid, Inc. - Distributed Power Flow Contro l Using Smart Wires for Energy Routing Program or Field Office: Advanced Research Projects ...

  16. Title IX: More than Just Sports

    Office of Energy Efficiency and Renewable Energy (EERE)

    Title IX isn't just about sports or the law. It's about securing a clean energy future by closing the gender gap in math and science.

  17. TYPES OF COMPLIANCE REQUIREMENTS: CFDA Number Program Title

    Office of Environmental Management (EM)

    National Industrial Competitiveness Through Energy, Environment, and Economics Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.112 Stewardship Science Grant Program Yes ...

  18. SECURITY AND CYBER REPORTS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SECURITY AND CYBER REPORTS SECURITY AND CYBER REPORTS Office of Security Assessments Office of Security Assessments - Report Titles

  19. Title 20 Alaska Administrative Code Section 25.112 Oil & Gas...

    Open Energy Info (EERE)

    12 Oil & Gas Well Plugging Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 20 Alaska Administrative Code...

  20. G Subject: Implementation of Division D, Title III and Title...

    Office of Environmental Management (EM)

    after the end of an FY. Who is the point of contact? ... Policy Division, Office of Policy at (202) ... L. No. 113-235 (2015 Act). The Congressional notification requirements of ...

  1. Brown Grease to Biodiesel Demonstration Project Report (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect SciTech Connect Search Results Technical Report: Brown Grease to Biodiesel Demonstration Project Report Citation Details In-Document Search Title: Brown Grease to Biodiesel Demonstration Project Report Municipal wastewater treatment facilities have typically been limited to the role of accepting wastewater, treating it to required levels, and disposing of its treatment residuals. However, a new view is emerging which includes wastewater treatment facilities as regional

  2. Compliance with Section 15 12 Reporting Requirements of the American Recovery and Reinvestment Act of 2009 (ARRA)

    Broader source: Energy.gov [DOE]

    Compliance with the reporting requirements of Section 15 12 is a main focus of post-award activities for awards funded by ARRA. The Recovery Operations Group of the Office of Performance Analysis and Evaluation in the Office of the Chief Financial Officer has been tracking compliance with the reporting requirement for DOE. They developed the attached list of contractors and recipients that have failed to report. Most of those not reporting are recipients receiving money from the Office of Energy Efficiency and Renewable Energy. Contracting Officers are asked to review the attached list for Contractors/Recipients under their cognizance and to send a letter to the requesting their attention, explanation and compliance. Draft templates of letters for a single or double non-compliance are attached. As the next reporting period is from April 1 to April 10,2010, Contracting Officers are requested to send the letter before April 1.

  3. crd title p1.ai

    Broader source: Energy.gov (indexed) [DOE]

    ... 4,404,941 3,276,281 2016 273 9 1,262,376 3,446,060 ... In the Electric Power Research Institute (EPRI) report ... Neutral weather conditions are typified by moderate wind ...

  4. Overview of the effect of Title III of the 1990 Clean Air Act Amendments on the natural gas industry

    SciTech Connect (OSTI)

    Child, C.J.

    1995-12-31

    The regulation of hazardous air pollutants by Title III of the Clean Air Act Amendments of 1990 has a potential wide-ranging impact for the natural gas industry. Title III includes a list of 189 hazardous air pollutants (HAPs) which are targeted for reduction. Under Title III, HAP emissions from major sources will be reduced by the implementation of maximum achievable control technology (MACT) standards. If the source is defined as a major source, it must also comply with Title V (operating permit) and Title VII (enhanced monitoring) requirements. This presentation will review Title III`s effect on the natural gas industry by discussing the regulatory requirements and schedules associated with MACT as well as the control technology options available for affected sources.

  5. Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300

    SciTech Connect (OSTI)

    MacDonnell, B.A.; Obenauf, K.S.

    1996-08-01

    The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline.

  6. Title 46 Alaska Statutes | Open Energy Information

    Open Energy Info (EERE)

    Title 46 Alaska StatutesLegal Published NA Year Signed or Took Effect 1971 Legal Citation Alaska Stat. tit. 46 (1971) DOI Not Provided Check for DOI availability: http:...

  7. Alaska Statutes: Title 38 | Open Energy Information

    Open Energy Info (EERE)

    Alaska Statutes: Title 38Legal Published NA Year Signed or Took Effect 2014 Legal Citation Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online...

  8. Title 30 Chapter 5 | Open Energy Information

    Open Energy Info (EERE)

    Chapter 5 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 30 Chapter 5Legal Published NA Year Signed or Took Effect 1969...

  9. Clean Air Act Title V: Knocking on your door

    SciTech Connect (OSTI)

    Hosford, R.B. )

    1993-01-15

    The Clean Air Act Amendments of 1990 made several significant changes in the clean air program. One of the key elements of the Amendments was the inclusion of an operating permit program in Title V. The purpose of the program is to establish a central point for tracking all applicable air quality requirements for every source required to obtain a permit. This article provides a brief description of the most significant provisions. In addition, the subject of permit modification is discussed in some detail.

  10. Engineering scale mixing system tests for MWTF title II design

    SciTech Connect (OSTI)

    Chang, S.C.

    1994-10-10

    Mixing tests for the Multifunction Waste Tank Facility (MWTF) were conducted in 1/25 and 1/10 scale test tanks with different slurry levels, solids concentrations, different jet mixers and with simulated in-tank structures. The same test procedure was used as in the Title I program, documented in WHC-SD-W236A-ER-005. The test results support the scaling correlation derived previously in the Title I program. The tests also concluded that a partially filled tank requires less mixing power, and horizontal and angled jets in combination (H/A mixer) are significantly more effective than the two horizontal jet mixers (H/H mixer) when used for mixing slurry with a high solids concentrations.

  11. DOJ Title Standards for Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOJ Title Standards for Acquisition DOJ Title Standards for Acquisition PDF icon Title Standards 2001 More Documents & Publications Acquisition Guide for Federal Agencies REAL ESTATE PROPERTY GUIDE 2014 REAL ESTATE PROPERTY GUIDE 2013

  12. Implications of Export/Import Reporting Requirements in the United States - International Atomic Energy Agency Safeguards Additional Protocol

    SciTech Connect (OSTI)

    Killinger, Mark H.; Benjamin, Eugene L.; McNair, Gary W.

    2001-02-20

    The United States has signed but not ratified the US/IAEA Safeguards Additional Protocol. If ratified, the Additional Protocol will require the US to report to the IAEA certain nuclear-related exports and imports to the IAEA. This document identifies and assesses the issues associated with the US making those reports. For example, some regulatory changes appear to be necessary. The document also attempts to predict the impact on the DOE Complex by assessing the historical flow of exports and imports that would be reportable if the Additional Protocol were in force.

  13. Title 33 CFR 327 Public Hearings | Open Energy Information

    Open Energy Info (EERE)

    Hearings (2014). Retrieved from "http:en.openei.orgwindex.php?titleTitle33CFR327PublicHearings&oldid890311" Feedback Contact needs updating Image needs updating...

  14. Title 16 USC 818 Public Lands Included in Project - Reservation...

    Open Energy Info (EERE)

    Entry (1996). Retrieved from "http:en.openei.orgwindex.php?titleTitle16USC818PublicLandsIncludedinProject-ReservationofLandsFromEntry&oldid722800" ...

  15. Transcript of March 28, 2013, TAP webinar titled Internal Benchmarking...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TAP webinar titled Internal Benchmarking Outreach and Data Collection Techniques Transcript of March 28, 2013, TAP webinar titled Internal Benchmarking Outreach and Data ...

  16. Title 22 California Code of Regulations | Open Energy Information

    Open Energy Info (EERE)

    Abstract Title 22 California Code of Regulations, current through August 7, 2014. Published NA Year Signed or Took Effect 2014 Legal Citation Title 22 California Code...

  17. File:AlaskaTitleVApplicationSubmittalInstructions.pdf | Open...

    Open Energy Info (EERE)

    AlaskaTitleVApplicationSubmittalInstructions.pdf Jump to: navigation, search File File history File usage File:AlaskaTitleVApplicationSubmittalInstructions.pdf Size of this...

  18. Title 40 CFR 1502 - Environmental Impact Statement | Open Energy...

    Open Energy Info (EERE)

    Regulation: Title 40 CFR 1502 - Environmental Impact StatementLegal Abstract Subpart 1502 Environmental Impact Statement under Title 40: Protection of Environment of the U.S. Code...

  19. Response to Request for Information titled "Addressing Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Request for Information titled "Addressing Policy and Logistical Challenges to Smart Grid Implementation" Response to Request for Information titled "Addressing Policy and ...

  20. Clarifying Technology Eligibility for Title XVII Loan Guarantee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations July 22, 2015 - 10:50am ...

  1. DRAFT - Design of Radiological Survey and Sampling to Support Title Transfer or Lease of Property on the Department of Energy Oak Ridge Reservation

    SciTech Connect (OSTI)

    Cusick L.T.

    2002-09-25

    The U.S. Department of Energy (DOE) owns, operates, and manages the buildings and land areas on the Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. As land and buildings are declared excess or underutilized, it is the intent of DOE to either transfer the title of or lease suitable property to the Community Reuse Organization of East Tennessee (CROET) or other entities for public use. It is DOE's responsibility, in coordination with the U.S. Environmental Protection Agency (EPA), Region 4, and the Tennessee Department of Environment and Conservation (TDEC), to ensure that the land, facilities, and personal property that are to have the title transferred or are to be leased are suitable for public use. Release of personal property must also meet site requirements and be approved by the DOE contractor responsible for site radiological control. The terms title transfer and lease in this document have unique meanings. Title transfer will result in release of ownership without any restriction or further control by DOE. Under lease conditions, the government retains ownership of the property along with the responsibility to oversee property utilization. This includes involvement in the lessee's health, safety, and radiological control plans and conduct of site inspections. It may also entail lease restrictions, such as limiting access to certain areas or prohibiting digging, drilling, or disturbing material under surface coatings. Survey and sampling requirements are generally more rigorous for title transfer than for lease. Because of the accelerated clean up process, there is an increasing emphasis on title transfers of facilities and land. The purpose of this document is to describe the radiological survey and sampling protocols that are being used for assessing the radiological conditions and characteristics of building and land areas on the Oak Ridge Reservation that contain space potentially available for title transfer or lease. After necessary surveys and sampling and laboratory analyses are completed, the data are analyzed and included in an Environmental Baseline Summary (EBS) report for title transfer or in a Baseline Environmental Analysis Report (BEAR) for lease. The data from the BEAR is then used in a Screening-Level Human Health Risk Assessment (SHHRA) or a risk calculation (RC) to assess the potential risks to future owners/occupants. If title is to be transferred, release criteria in the form of specific activity concentrations called Derived Concentration Guideline Levels (DCGLs) will be developed for the each property. The DCGLs are based on the risk model and are used with the data in the EBS to determine, with statistical confidence, that the release criteria for the property have been met. The goal of the survey and sampling efforts is to (1) document the baseline conditions of the property (real or personal) prior to title transfer or lease, (2) obtain enough information that an evaluation of radiological risks can be made, and (3) collect sufftcient data so that areas that contain minimal residual levels of radioactivity can be identified and, following radiological control procedures, be released from radiological control. (It should be noted that release from radiological control does not necessarily mean free release because DOE may maintain institutional control of the site after it is released from radiological control). To meet the goals of this document, a Data Quality Objective (DQO) process will be used to enhance data collection efficiency and assist with decision-making. The steps of the DQO process involve stating the problem, identifying the decision, identifying inputs to the decision, developing study boundaries, developing the decision rule, and optimizing the design. This document describes the DQOs chosen for surveys and sampling efforts performed for the purposes listed above. The previous version to this document focused on the requirements for radiological survey and sampling protocols that are be used for leasing. Because the primary focus at this time is on title transfer, this revision applies to both situations.

  2. Final Report: "Collaborative Project. Understanding the Chemical...

    Office of Scientific and Technical Information (OSTI)

    Report: "Collaborative Project. Understanding the Chemical Processes That Affect Growth ... Title: Final Report: "Collaborative Project. Understanding the Chemical Processes That ...

  3. Damaged Surface Hydrodynamics (DSH) Flash Report (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Damaged Surface Hydrodynamics (DSH) Flash Report Citation Details In-Document Search Title: Damaged Surface Hydrodynamics (DSH) Flash Report You are accessing ...

  4. FY09 Engineering Research & Technology Report (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: FY09 Engineering Research & Technology Report Citation Details In-Document Search Title: FY09 Engineering Research & Technology Report Authors: Sharpe, R ; Pannu, ...

  5. Evaluation of technology modifications required to apply clean coal technologies in Russian utilities. Final report

    SciTech Connect (OSTI)

    1995-12-01

    The report describes the following: overview of the Russian power industry; electric power equipment of Russia; power industry development forecast for Russia; clean coal technology demonstration program of the US Department of Energy; reduction of coal TPS (thermal power station) environmental impacts in Russia; and base options of advanced coal thermal power plants. Terms of the application of clean coal technology at Russian TPS are discussed in the Conclusions.

  6. 2013 Annual Site Inspection and Monitoring Report for Uranium...

    Office of Scientific and Technical Information (OSTI)

    Control Act Title II Disposal Sites Citation Details In-Document Search Title: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act ...

  7. 2013 Annual Site Inspection and Monitoring Report for Uranium...

    Office of Scientific and Technical Information (OSTI)

    Control Act Title I Disposal Sites Citation Details In-Document Search Title: 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act ...

  8. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    SciTech Connect (OSTI)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview of the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.

  9. Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6

    Broader source: Energy.gov [DOE]

    Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6.

  10. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE REporting requirements_presentations_4-29-14.ppt [Compatibility M

    National Nuclear Security Administration (NNSA)

    Overview of DOE and NRC Reporting to NMMSS Similarities, Differences, and Challenges John Ballard, DOE Reconciliation Mary McConnell, NRC Reconciliation LINK Technologies Reporting to NMMSS Regulatory Compliance DOE Reporting Requirements NRC Reporting Requirements Resources 2 Regulatory Compliance DOE regulatory questions? - Contact Pete Dessaules DOE NMMSS Program Manager 301-903-4525 pete.dessaules@nnsa.doe.gov NRC regulatory questions? - Contact Brian Horn NRC NMMSS Program Manager

  11. Trials and tribulations implementing the Clean Air Act Title V in fourteen air districts

    SciTech Connect (OSTI)

    Moore, C.

    1998-12-31

    Santa Fe pacific Pipeline Partners, L.P. (SFPP) is a refined petroleum pipeline operating in six states in the western United States. Sixteen terminals are subject to the Title V permit to operate requirements. There are many obstacles to overcome, not only when preparing applications for Title V operating permits, but in the implementation phase of the project as well. Each Air District has its own set of rules and regulations that must be adhered to in preparing the application. For example, some districts required the insignificant sources to be documented and included in compliance plans and some do not. The format required for the application varies from stringent forms that must be completed to no forms at all. In preparing the Title V application for SFPP, the author quickly realized if this confusion was transferred to the implementation phase, compliance would be a failure. Therefore, early on the environmental manager instituted a training program. Beginning with a pilot program in one district the author began training managers and supervisors. This program quickly was expanded to include senior vice presidents and technicians. This training session was a one hour of general overview to visually describe how the Title V process would affect the facilities. As a result of this training, virtually every employee became familiar with how the Title V program was affecting the facilities. Engineering and Customer Service is instructed to notify the manager of any and every new project so it could undergo a review to determine if it affected a Title V facility. The field acts as a check of the system. Any change or modification at any facility is immediately under scrutiny for Title V implications. Another obstacle to overcome is to help the facility deal with something that is new and basically a different way of operating.

  12. G Subject: Implementation of Division D, Titles III and V, and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section Pub.L. No. 113-76 301(a) and Title V, Sections 501, 502, 503 Division E, Title ... of Division D, Title III and Title V, and Division E, Title VII of the ...

  13. Emissions inventory report summary for Los Alamos National Laboratory for calendar year 2008

    SciTech Connect (OSTI)

    Ecology and Air Quality Group

    2009-10-01

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory’s potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2008. LANL’s 2008 emissions are well below the emission limits in the Title V Operating Permit.

  14. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2006

    SciTech Connect (OSTI)

    Ecology and Air Quality Group

    2007-09-28

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. Modification Number 1 to this Title V Operating Permit was issued on June 15, 2006 (Permit No P-100M1) and includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2006. LANL's 2006 emissions are well below the emission limits in the Title V Operating Permit.

  15. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2004

    SciTech Connect (OSTI)

    M. Stockton

    2005-10-01

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), ''Notice of Intent and Emissions Inventory Requirements''. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department, Air Quality Bureau, under 20.2.70 NMAC. This Title V Operating Permit (Permit No. P-100) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semi-annual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semi-annual emissions reporting for LANL for calendar year 2004. LANL's 2004 emissions are well below the emission limits in the Title V Operating Permit.

  16. Emissions Inventory Report Summary for Los Alamos National Laboratory for Calendar Year 2009

    SciTech Connect (OSTI)

    Environmental Stewardship Group

    2010-10-01

    Los Alamos National Laboratory (LANL) is subject to annual emissions reporting requirements for regulated air pollutants under Title 20 of the New Mexico Administrative Code, Chapter 2, Part 73 (20.2.73 NMAC), Notice of Intent and Emissions Inventory Requirements. The applicability of the requirements is based on the Laboratory's potential to emit 100 tons per year of suspended particulate matter, nitrogen oxides, carbon monoxide, sulfur oxides, or volatile organic compounds. Additionally, on April 30, 2004, LANL was issued a Title V Operating Permit from the New Mexico Environment Department/Air Quality Bureau, under 20.2.70 NMAC. This permit was modified and reissued on July 16, 2007. This Title V Operating Permit (Permit No. P-100M2) includes emission limits and operating limits for all regulated sources of air pollution at LANL. The Title V Operating Permit also requires semiannual emissions reporting for all sources included in the permit. This report summarizes both the annual emissions inventory reporting and the semiannual emissions reporting for LANL for calendar year 2009. LANL's 2009 emissions are well below the emission limits in the Title V Operating Permit.

  17. Title FREEDOM OF INFORMATION ACT REQUEST (FOT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    [ Section 3 Document Inf ormation Document # FOIA-2009-0054TPRevision Title FREEDOM OF INFORMATION ACT REQUEST (FOT 2009-0054) bate 09/02/2009 Originator RIEHLE bC Originator Co. OOE-RL Recipient JAR VIS R Recipient Co. HEART OF __________AMERICA NW References Keywords OCE, FOIA, SENSITIVE, PRIVATE CITIZEN Projects Other Inf ormation___________________________ JAN NH JTA TRANSMITTAL AETlOs. 2. To: (Receiving Organization) 3. From: (Originating organization) J4. Related EDT No.: G. C. Evans RCRA

  18. Title XVII Supplements on Distributed Energy Projects

    Energy Savers [EERE]

    Title XVII Supplements on Distributed Energy Projects Distributed Energy Projects are currently driving innovation and transforming U.S. energy markets. Technologies such as rooftop solar, energy storage, smart grid technology, and methane capture for oil and gas wells can modernize our energy infrastructure, enhance energy reliability, create economic opportunity, and reduce greenhouse gas emissions. However, many of these distributed technologies currently face market barriers since commercial

  19. Contractor Legal Management Requirements

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  20. {open_quotes}Methods for the determination of the Clean Air Act Title III metallic HAPS in coal

    SciTech Connect (OSTI)

    Snider, J.

    1995-08-01

    The Clean Air Act was amended in 1990 and additional requirements were added to Title III {open_quotes}Air Toxics.{close_quotes} Title III identified one hundred eighty-nine hazardous air pollutants (HAPS) and Congress directed the EPA to study the effects of emissions of these HAPS on public health and the environment. EPA is to report to Congress in the fall of 1995 concerning their findings and make recommendations regarding fossil fuel fired combustion units. The outcome of the EPA recommendations will be of great interest to coal producers and users. Of the one hundred eighty-nine listed HAPS, eleven are trace metals found in coal. The producers and users may be required to analyze coal for these HAPS, to determine if selective mining and/or beneficiation can lower their occurrence, to determine their fate in the combustion process, etc. Indeed many coal companies have begun to study their reserves to aid the EPA investigation. Currently there are no EPA promulgated test methodologies for these elements in coal. Moreover, the American Society for Testing Materials (ASTM) does not provide standards for the analyses of all of the eleven HAPS either. In view of this lack of standardized analytical protocols the commercial laboratory is left with finding the best methods for meeting these analytical needs. This paper describes how Standard Laboratories, Inc. as a whole and particularly its Environmental Laboratory Division has met this need.

  1. Title 24 Chapter 117 Municipal and Regional Planning and Development...

    Open Energy Info (EERE)

    Title 24 Chapter 117 Municipal and Regional Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24...

  2. Title 24 Chapter 117 Municipal Planning and Development | Open...

    Open Energy Info (EERE)

    Title 24 Chapter 117 Municipal Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24 Chapter 117...

  3. Title 43 CFR 1601 Planning | Open Energy Information

    Open Energy Info (EERE)

    Title 43 CFR 1601 Planning Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR 1601 PlanningLegal...

  4. Title 40 CFR 355 Emergency Planning and Notification | Open Energy...

    Open Energy Info (EERE)

    Title 40 CFR 355 Emergency Planning and Notification Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title...

  5. Learning About the Equal Employment Opportunity- Title VII- Complaint Process

    Broader source: Energy.gov [DOE]

    Learn about what is unlawful under Title VII, the legislation behind it, the steps before filing a complaint (mediation), how an individual files an official Title VII complaint, the acceptance or...

  6. Interested Parties - Memo on Halting Title XVII Nuclear Loan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in MD, SC, GA, and TX Interested Parties - Memo on Halting Title XVII Nuclear Loan Guarantees in MD, SC, GA, ...

  7. Title 16 USC Chapter 35 - Endangered Species | Open Energy Information

    Open Energy Info (EERE)

    Title 16 USC Chapter 35 - Endangered Species Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC Chapter 35 - Endangered...

  8. Title 18 CFR 131 Forms | Open Energy Information

    Open Energy Info (EERE)

    Regulation: Title 18 CFR 131 FormsLegal Abstract Part 131, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  9. Title 18 CFR 381 Fees | Open Energy Information

    Open Energy Info (EERE)

    Regulation: Title 18 CFR 381 FeesLegal Abstract Part 381 Fees, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  10. MCA Title 85 - Water Use | Open Energy Information

    Open Energy Info (EERE)

    MCA Title 85 - Water Use Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: MCA Title 85 - Water UseLegal Abstract Statutory...

  11. Title 43 CFR 4120: Grazing Management | Open Energy Information

    Open Energy Info (EERE)

    Title 43 CFR 4120: Grazing Management Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 43 CFR 4120: Grazing...

  12. Title 23 CFR 645 Utilities | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 23 CFR 645 UtilitiesLegal Abstract Part 645 - Utilities under Title 23: Highways of the...

  13. Title 23 USC 109 Standards | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 23 USC 109 StandardsLegal Abstract Section 109 - Standards under Title 23: Highways of the...

  14. Title 16 Alaska Statutes Chapter 20 Fish and Game Conservation...

    Open Energy Info (EERE)

    Title 16 Alaska Statutes Chapter 20 Fish and Game Conservation Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 Alaska...

  15. File:Title V Checklist.pdf | Open Energy Information

    Open Energy Info (EERE)

    Title V Checklist.pdf Jump to: navigation, search File File history File usage File:Title V Checklist.pdf Size of this preview: 463 599 pixels. Other resolution: 464 600...

  16. Title 36 CFR 228 Minerals | Open Energy Information

    Open Energy Info (EERE)

    Regulation: Title 36 CFR 228 MineralsLegal Abstract Part 228 Minerals under Title 36: Parks, Forests, and Public Property of the U.S. Code of Federal Regulations, current as of...

  17. NIF Functional Requirements and Primary Criteria Rev. 1.8 September 2006

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Technical Report: NIF Functional Requirements and Primary Criteria Rev. 1.8 September 2006 Citation Details In-Document Search Title: NIF Functional Requirements and Primary Criteria Rev. 1.8 September 2006 Authors: Patterson, R ; Samuelson, S Publication Date: 2014-09-29 OSTI Identifier: 1165807 Report Number(s): LLNL-TR-661755 DOE Contract Number: DE-AC52-07NA27344 Resource Type: Technical Report Research Org: Lawrence Livermore National Laboratory

  18. ALCC Allocation Final Report: HPC Colony II (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    ALCC Allocation Final Report: HPC Colony II Citation Details In-Document Search Title: ALCC Allocation Final Report: HPC Colony II You are accessing a document from the ...

  19. Anonymous Referee Report (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Anonymous Referee Report Citation Details In-Document Search Title: ... This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and ...

  20. An Anonymous Referee Report (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Technical Report: An Anonymous Referee Report Citation Details In-Document Search Title: ... This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and ...

  1. DNDO Report (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    DNDO Report Citation Details In-Document Search Title: DNDO Report My internship program ... Save Share this Record Citation Formats MLA APA Chicago Bibtex Export Metadata Endnote ...

  2. Long Range Neutron Detection: A Progress Report (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Long Range Neutron Detection: A Progress Report Citation Details In-Document Search Title: Long Range Neutron Detection: A Progress Report You are accessing a document from the ...

  3. Long Range Neutron Detection: A Progress Report (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Long Range Neutron Detection: A Progress Report Citation Details In-Document Search Title: Long Range Neutron Detection: A Progress Report The detection of neutron sources horn a ...

  4. HUD Title 1 PowerSaver Lenders | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HUD Title 1 PowerSaver Lenders HUD Title 1 PowerSaver Lenders PDF icon HUD Title 1 PowerSaver Lenders More Documents & Publications PowerSaver Approved Lenders List HUD 203(k) PowerSaver Lenders Introducing the New PowerSaver Loan Program from HUD/FHA

  5. TPO's Acceptance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TECHNICAL PROJECT OFFICER'S ACCEPTANCE REPORT DATE OF REQUEST: AWARD NUMBER: DE- AWARD PERIOD FROM: TO: NAME OF AWARDEE: PROJECT TITLE: OVERALL RATING OF AWARDEE'S PERFORMANCE ...

  6. Enabling graphene nanoelectronics. (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Enabling graphene nanoelectronics. Citation Details In-Document Search Title: Enabling graphene nanoelectronics. Recent work has shown that graphene, a 2D electronic material amenable to the planar semiconductor fabrication processing, possesses tunable electronic material properties potentially far superior to metals and other standard semiconductors. Despite its phenomenal electronic properties, focused research is still required to develop techniques for depositing and

  7. Microsoft Word - Final Report.doc

    Office of Scientific and Technical Information (OSTI)

    Report Title and Type: FINAL PROJECT TECHNICAL NARRATIVE REPORT Report Period: SEPTEMBER ... Within a tight crude oil supply market, this project demonstrates the ability to maintain ...

  8. Using the NEPA Requirements and Guidance - Search Index

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    your computer or USB drive. 2. Locate and Open the extracted folder "NEPA Requirements and Guidance - Search Index". 3. Locate and Open the .PDX file titled "Search - NEPA ...

  9. Origins of weak lensing systematics, and requirements on future...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Origins of weak lensing systematics, and requirements on future instrumentation (or knowledge of instrumentation) Citation Details In-Document Search Title:...

  10. Draft Title 40 CFR 191 compliance certification application for the Waste Isolation Pilot Plant. Volume 1

    SciTech Connect (OSTI)

    1995-03-31

    The Waste Isolation Pilot Plant (WIPP) is a research and development facility for the demonstration of the permanent isolation of transuranic radioactive wastes in a geologic formation. The facility was constructed in southeastern New Mexico in a manner intended to meet criteria established by the scientific and regulatory community for the safe, long-term disposal of transuranic wastes. The US Department of Energy (DOE) is preparing an application to demonstrate compliance with the requirements outlined in Title 40, Part 191 of the Code of Federal Regulations (CFR) for the permanent disposal of transuranic wastes. As mandated by the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act of 1992, the US Environmental Protection Agency (EPA) must evaluate this compliance application and provide a determination regarding compliance with the requirements within one year of receiving a complete application. Because the WIPP is a very complex program, the DOE has planned to submit the application as a draft in two parts. This strategy will allow for the DOE and the EPA to begin technical discussions on critical WIPP issues before the one-year compliance determination period begins. This report is the first of these two draft submittals.

  11. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    SciTech Connect (OSTI)

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclear Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.

  12. Office of Security Assessments - Report Titles | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Enterprise Assessments Security Assessment of the Y-12 National Security Complex ... Safeguards and Security Inspection at the Y-12 National Security Complex, January 9, 2015 ...

  13. "Title","Speaker","Publication Date","OSTI Identifier","Report...

    Office of Scientific and Technical Information (OSTI)

    Org.","Sponsoring Org.","Subject","Related Subject","DescriptionAbstract","Publisher","Country of Publication","Language","Format","Availability","Rights","System Entry Date"

  14. Title Trip Report: Hydrologic Field Reconnaissance Led by Robert...

    National Nuclear Security Administration (NNSA)

    ... Water Basin was designated to give greater administrative control to the state engineer. ... with the Office of the Nevada State Engineer, and NTS. water withdrawal records ...

  15. Final Progress Report Project Title: Northeast Provider of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... KVCC which evaluated each instructor's ability to: incorporate solar technologies into ... The keynote speaker, national SITN manager Joe Sarubbi, shared the many successes the ...

  16. Report Title: PILOT TESTING: PRETREATMENT OPTIONS TO ALLOW RE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will probably drive drillers toward discovery and use of non-toxic alternatives for fracking chemicals whenever possible. Fear of liability will impel this shift probably as much...

  17. Policy Flash 2014-27 Implementation of Division D, Titles III...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Division D, Titles III and V, and Division E, Title VII of the ... Policy Flash 2014-27 Implementation of Division D, Titles III and V, and Division E, Title ...

  18. Clarifying Technology Eligibility for Title XVII Loan Guarantee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solicitations | Department of Energy Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations July 22, 2015 - 10:50am Addthis Clarifying Technology Eligibility for Title XVII Loan Guarantee Solicitations Douglas Schultz Douglas Schultz Director of Loan Guarantee Origination During the latest three solicitations issued by the Department's Loan Programs Office (LPO) for approximately $24 billion

  19. Title III of the Defense Production Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Title III of the Defense Production Act Title III of the Defense Production Act Matthew Seaford presentation on Title III of the Defense Production Act at the Industry Roundtable. PDF icon 2_seaford_roundtable.pdf More Documents & Publications A National Strategic Plan For Advanced Manufacturing Market Drivers for Biofuels Networking and Information Technology Research and Development Supplement to the President's Budget (February 2010)

  20. Examination of utility Phase 1 compliance choices and state reactions to Title IV of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Bailey, K.A.; Elliott, T.J.; Carlson, L.J.; South, D.W.

    1993-11-01

    Title IV (acid rain) of the Clean Air Act Amendments of 1990 is imposing new limitations on the emission of sulfur dioxide (SO{sub 2}) and nitrogen oxides (N{sub x}) from electric power plants. The act requires utilities to develop compliance plans to reduce these emissions, and indications are that these plans will dramatically alter traditional operating procedures. A key provision of the SO{sub 2} control program deaned in Title IV is the creation of a system of emission allowances, with utilities having the option of complying by adjusting system emissions and allowance holdings. A compilation of SO{sub 2} compliance activities by the 110 utility plants affected by Phase I is summarized in this report. These compliance plans are presented in a tabular form, correlated with age, capacity, and power pool data. A large number of the Phase I units (46%) have chosen to blend or switch to lower sulfur coals. This choice primarily is in response to (1) prices of low-sulfur coal and (2) the need to maintain SO{sub 2} control flexibility because of uncertain future environmental regulations (e.g., air toxics, carbon dioxide) and compliance prices. The report also discusses the responses of state legislatures and public utility commissions to the compliance requirements in Title IV. Most states have taken negligible action regarding the regulatory treatment of allowances and compliance activities. To protect mine employment, states producing high-sulfur coal have enacted regulations encouraging continued use of that coal, but for the most part, this response has had little effect on utility compliance choices.