National Library of Energy BETA

Sample records for reporting guidance draft

  1. Microsoft Word - DRAFT CRB Interview Guidance.doc | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT CRB Interview Guidance.doc Microsoft Word - DRAFT CRB Interview Guidance.doc More Documents & Publications Microsoft Word - ARRAAttachment12v1.doc Microsoft Word - ...

  2. CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Issues Revised Draft Guidance on Consideration of ...

  3. Revised Draft Guidance on Consideration of Greenhouse Gas Emissions...

    Energy Savers [EERE]

    Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate ...

  4. DRAFT NEPA Guidance on Consideration of the Effects of Climate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and ...

  5. Energy Department Seeks Feedback on Draft Guidance for the Hydroelectr...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program ...

  6. Energy Department Seeks Additional Feedback on Draft Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Additional Feedback on Draft Guidance for the Hydroelectric ...

  7. Probabilistic risk assessment (PRA): status report and guidance for regulatory application. Draft report for comment

    SciTech Connect (OSTI)

    none,

    1984-02-01

    This document describes the current status of the methodologies used in probabilistic risk assessment (PRA) and provides guidance for the application of the results of PRAs to the nuclear reactor regulatory process. The PRA studies that have been completed or are underway are reviewed. The levels of maturity of the methodologies used in a PRA are discussed. Insights derived from PRAs are listed. The potential uses of PRA results for regulatory purposes are discussed.

  8. CEQ Extends Comment Period on Revised Draft Guidance on Consideration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extends Comment Period on Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Extends Comment Period on ...

  9. Revised DRAFT NEPA Guidance on Consideration of the Effects of...

    Office of Environmental Management (EM)

    of the Effects of Climate Change and Greenhouse Gas Emissions (DOE, 2014) Revised DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas ...

  10. Energy Department Seeks Additional Feedback on Draft Guidance for the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Production Incentive Program | Department of Energy Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Additional Feedback on Draft Guidance for the Hydroelectric Production Incentive Program October 20, 2014 - 9:15am Addthis The Department of Energy (DOE) is currently inviting comments from the general public on revised guidance relating to the implementation of Section 242 of the Energy Policy Act of 2005, the

  11. Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Incentive Program | Department of Energy Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program July 1, 2014 - 11:25am Addthis The Department of Energy (DOE) is currently inviting comments from the general public on guidance relating to the implementation of Section 242 of the Energy Policy Act of 2005, the "Hydroelectric Production Incentive

  12. Guidance, Reports, and Documents

    Broader source: Energy.gov [DOE]

    The following are annual reports, guidance documents, and regulatory drivers for long-term surveillance and maintenance activities.

  13. Draft For-Profit Audit Guidance (FY 2011) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft For-Profit Audit Guidance (FY 2011) Draft For-Profit Audit Guidance (FY 2011) File For-ProfitAuditGuidance(Part I)Federal Register0.docx File For-ProfitAuditGeneralCo...

  14. Draft Guidance for Section 242 of the Energy Policy Act of 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Guidance for Section 242 of the Energy Policy Act of 2005 - Hydroelectric Production Incentive Program - July 2014 Draft Guidance for Section 242 of the Energy Policy Act of ...

  15. Draft Energy Sector Cybersecurity Framework Implementation Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    in the Federal Register, inviting the public to comment on DOE's Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October...

  16. Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews

    Broader source: Energy.gov [DOE]

    On December 18, 2014, CEQ released revised draft guidance for public comment that describes how Federal departments and agencies should consider the effects of greenhouse gas emissions and climate change in their National Environmental Policy Act reviews. The revised draft guidance supersedes the draft greenhouse gas and climate change guidance released by CEQ in February 2010.

  17. CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Revised Draft NEPA Guidance on GHG Emissions and Climate Change CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change March 3, 2015 - 10:37am Addthis CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change What are the key facts? CEQ issued revised draft guidance in December to "provide Federal agencies direction on when and how to consider the effects of greenhouse gas (GHG) emissions and climate change" in NEPA

  18. Draft Guidance for Section 242 of the Energy Policy Act of 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Act of 2005 - Hydroelectric Production Incentive Program - July 2014 Draft Guidance for Section 242 of the Energy Policy Act of 2005 - Hydroelectric Production Incentive ...

  19. Energy Sector Cybersecurity Framework Implementation Guidance- Draft for Public Comment & Comment Submission Form (September 2014)

    Broader source: Energy.gov [DOE]

    On September 12, 2014, the Department issued a Federal Register Notice announcing the availability of the Energy Sector Cybersecurity Framework Implementation Guidance for public comment. The draft Energy Sector Cybersecurity Framework Implementation Guidance and comment submission form are available.

  20. Draft Guidance for Section 242 of the Energy Policy Act of 2005- Hydroelectric Production Incentive Program- July 2014

    Broader source: Energy.gov [DOE]

    This document contains draft guidance for Section 242 of the Energy Policy Act of 2005, the "Hydroelectric Production Incentive Program"

  1. Policy, Guidance & Reports

    Broader source: Energy.gov [DOE]

    The Department of Energy’s (DOE) Office of Environment, Health, Safety and Security (EHSS) administers DOE-wide health, safety, security and environmental policy, programs and guidance, and related federal requirements that support DOE’s mission accomplishment in a safe, secure and environmentally responsible manner. Guidance documents are developed to support effective implementation of directives and standards and provide technical positions on Departmental worker safety and health directives and standards.

  2. Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance, a letter to grantees from the U.S. Department of Energy's Better Buildings Neighborhood Program. PDF icon Form Guidance More Documents & Publications SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Draft Sample Collection Instrument

  3. DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ) issued this draft guidance memorandum for public consideration and comment on the ways in which Federal agencies can improve their consideration of the...

  4. CEQ Extends Comment Period on Revised Draft Guidance on Consideration of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews | Department of Energy Extends Comment Period on Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews CEQ Extends Comment Period on Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews February 20, 2015 - 11:03am Addthis The Council on Environmental Quality (CEQ) has extended by 30 days the

  5. Draft Policy and Planning Guidance for Community Transition Activities

    Broader source: Energy.gov [DOE]

    Planning Guidance for Contractor Work Force RestructuringOffice of Worker and Community Transition 

  6. RCRA ground-water monitoring: Draft technical guidance

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    The manual was prepared to provide guidance for implementing the ground-water monitoring regulations for regulated units contained in 40 CFR Part 264 Subpart F and the permitting standards of 40 CFR Part 270. The manual also provides guidance to owners and operators of treatment, storage, and disposal facilities (TSDFs) that are required to comply with the requirements of 40 CFR Part 264 Subparts J (Tank Systems), K (Surface Impoundments), L (Waste Piles), N (Landfills), and X (Miscellaneous Units). This document updates technical information contained in other sources of U.S. EPA guidance, such as chapter eleven of SW-846 (Revision O, September 1986) and the Technical Enforcement Guidance Document (TEGD).

  7. Environmental impact report (draft)

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  8. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  9. CEQ Issues Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews

    Broader source: Energy.gov [DOE]

    The Council on Environmental Quality (CEQ) issued revised draft guidance on consideration of greenhouse gas (GHG) emissions and the effects of climate change in National Environmental Policy Act (NEPA) reviews on December 18, 2014

  10. Revised DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions (DOE, 2014)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Council on Environmental Quality (CEQ) issued this revised draft guidance memorandum for public consideration and comment on the ways in which Federal agencies can improve their consideration...

  11. 2012 Federal Real Property Council Reporting Guidance | Department...

    Broader source: Energy.gov (indexed) [DOE]

    2012 Data Dictionary FINAL.pdf More Documents & Publications 2015 Federal Real Property Council Reporting Guidance FRPC User Guidance -for FY2006 FRPC User Guidance -for FY2006...

  12. 2015 Federal Real Property Council Reporting Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Federal Real Property Council Reporting Guidance 2015 Federal Real Property Council Reporting Guidance Real Property Reporting: EO 13327 requires agencies to report annually ...

  13. SGIG Reporting Guidance Archive | Department of Energy

    Energy Savers [EERE]

    SGIG Reporting Guidance Archive SGIG Reporting Guidance Archive July 22, 2010-- Federal Register Notice on the DOE's invitation for public comment on request to the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial Assistance Grants, OMB Control No. 1910-5149 that DOE has submitted to OMB pursuant to the Paperwork Reduction Act of 1995. Comments due on or before August 21, 2010. More> Public comments

  14. 1 Advisory, Consultative, Deliberative, Draft SANDIA REPORT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advisory, Consultative, Deliberative, Draft SANDIA REPORT SAND 2014-3122 Unlimited Release Printed April 2014 Implementation of Voltage and Frequency Ride-Through Requirements in Distributed Energy Resources Interconnection Standards Reigh Walling, Walling Energy Systems Consulting, LLC Abraham Ellis, Sandia National Laboratories Sigifredo Gonzalez, Sandia National Laboratories Technical Report Sandia National Laboratories Albuquerque, New Mexico 87185 and Livermore, California 94550 Sandia

  15. 2011 Workforce Analysis and Staffing Plan Report Memo, Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2011 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy ...

  16. 2010 Workforce Analysis and Staffing Plan Report Memo, Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2010 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy ...

  17. 2014 Workforce Analysis and Staffing Plan Report Memo, Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2014 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy ...

  18. 2015 Workforce Analysis and Staffing Plan Report Memo, Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2015 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy ...

  19. 2013 Workforce Analysis and Staffing Plan Report Memo, Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2013 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy ...

  20. 2012 Workforce Analysis and Staffing Plan Report Memo, Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2012 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy ...

  1. SEP/EECBG Reporting Guidance FAQs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EECBG Reporting Guidance FAQs SEPEECBG Reporting Guidance FAQs PDF icon sepeecbgreportingguidancefaqs06242011.pdf More Documents & Publications Letter to EECBG Recipients on ...

  2. Nuclear Safety Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Safety Policy, Guidance & Reports Nuclear Safety Policy, Guidance & Reports The Office of Nuclear Safety establishes and maintains nuclear safety policy, requirements, and ...

  3. Reporting Guidance for Federal Agency Annual Report on Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance includes three attachments that were developed to assist agencies with their reporting requirements. Open the reporting requirements template to access: Attachment 1: ...

  4. Blackout 2003: Conference for public review draft report on implementation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the task force recommendations | Department of Energy Conference for public review draft report on implementation of the task force recommendations Blackout 2003: Conference for public review draft report on implementation of the task force recommendations On Thursday, June 22, in Washington, D.C., the U.S.-Canada Power System Outage Task Force will hold a conference for stakeholders and the public to comment on the draft of the final report of the Task Force. The draft report assesses

  5. Smart Grid Grant Program Recipient Reporting Guidance, Updated | Department

    Energy Savers [EERE]

    of Energy Grant Program Recipient Reporting Guidance, Updated Smart Grid Grant Program Recipient Reporting Guidance, Updated Reporting guidance for the Smart Grid Investment Grant project under the American Recovery and Reinvestment Act. Approved by the Office of Management and Budget (OMB). Includes guidance on DOE corporate reporting, Project Management Value System (PVMS) reporting, risk management reporting, milestone reporting, and DOE jobs reporting guidance. PDF icon Smart Grid Grant

  6. Acquisition Savings Reporting Template Guidance

    Broader source: Energy.gov [DOE]

    As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting acquisition savings/cost avoidance data effective as of October 1, 2012.

  7. OHA 2014 ANNUAL REPORT DRAFT....

    Energy Savers [EERE]

    DOE/HG-0026 Office of Hearings & Appeals Annual Report FY 2014 Message from the Director . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 I. Areas of JURISDICTION 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  8. OHA 2012 ANNUAL REPORT DRAFT....

    Energy Savers [EERE]

    Annual Report O H A ffice of earin s ppeals & g Doe/hg-0024 U.S. DEPARTMENT OF ENERGY Office of Hearings Appeals & FY 2012 Annual Report Message from the Director . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ntroduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I. Areas of JURISDICTION II. Working with

  9. 2013 guidance fo real Property Inventory Reporting | Department of Energy

    Energy Savers [EERE]

    guidance fo real Property Inventory Reporting 2013 guidance fo real Property Inventory Reporting PDF icon SIGNED_FY13_Rpt_Instructions REV - 2013.08.15.pdf More Documents & Publications FY 2012 Federal Real Property Reporting Requirement FY09_Federal_Real_Property_Reporting_Requirements.pdf Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations

  10. OHA 2014 ANNUAL REPORT DRAFT....

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hearings & Appeals Annual Report FY 2015 DOE/HG-0027 U.S. Department of Energy i 2015 Annual Report Office of Hearings and Appeals TABLE OF CONTENTS MESSAGE FROM THE DIRECTOR 1 INTRODUCTION 2 OVERVIEW OF FY 2015 CASE PROCESSING 3 AREAS OF JURISDICTION 4 A. PERSONNEL SECURITY 4 B. WHISTLEBLOWER 8 C. ALTERNATIVE DISPUTE RESOLUTION 9 D. FREEDOM OF INFORMATION AND PRIVACY ACTS 11 E. EXCEPTIONS AND SPECIAL REDRESS 13 F. OTHER AREAS OF OHA JURISDICTION 15 1. Subpart V Refund Proceeding 15 2.

  11. Blackout 2003: Conference for public review draft report on implementa...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on implementation of the task force recommendations Blackout 2003: Conference for public review draft report on implementation of the task force recommendations On Thursday, ...

  12. Mini-Guidance Articles from Lessons Learned Quarterly Reports...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005 Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005 The ...

  13. Long-Term Stewardship Baseline Report and Transition Guidance

    SciTech Connect (OSTI)

    Kristofferson, Keith

    2001-11-01

    Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after facility cleanup is complete. As the Department of Energys (DOE) lead laboratory for environmental management programs, the Idaho National Engineering and Environmental Laboratory (INEEL) administers DOEs long-term stewardship science and technology efforts. The INEEL provides DOE with technical, and scientific expertise needed to oversee its long-term environmental management obligations complexwide. Long-term stewardship is administered and overseen by the Environmental Management Office of Science and Technology. The INEEL Long-Term Stewardship Program is currently developing the management structures and plans to complete INEEL-specific, long-term stewardship obligations. This guidance document (1) assists in ensuring that the program leads transition planning for the INEEL with respect to facility and site areas and (2) describes the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete. Additionally, this document summarizes current information on INEEL facilities, structures, and release sites likely to enter long-term stewardship at the completion of DOEs cleanup mission. This document is not intended to function as a discrete checklist or local procedure to determine readiness to transition. It is an overarching document meant as guidance in implementing specific transition procedures. Several documents formed the foundation upon which this guidance was developed. Principal among these documents was the Long-Term Stewardship Draft Technical Baseline; A Report to Congress on Long-Term Stewardship, Volumes I and II; Infrastructure Long-Range Plan; Comprehensive Facility Land Use Plan; INEEL End-State Plan; and INEEL Institutional Plan.

  14. Draft 1992 Resource Program : Technical Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  15. Draft 1992 Resource Program : Technical Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  16. Draft Report to Congress: Energy Policy Act of 2005, Section...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land ...

  17. Guidance

    Broader source: Energy.gov [DOE]

    This site provides a centralized topical resource for enforceable DOE and federal health, safety and security requirements and related guidance documents. DOE’s guidance documents support understanding, ensure technical and management capabilities and collaborative improvement efforts.

  18. Work Group Telecom (Draft Charters) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telecom (Draft Charters) Work Group Telecom (Draft Charters) Meeting Date: September 8, ... Charter Template PDF icon Draft Work Group Matrix PDF icon Draft Work Group Guidance ...

  19. Classification Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Classification Policy, Guidance & Reports Classification Policy, Guidance & Reports Statutes, Regulations, Executive Orders, DOE Directives and Bulletins Atomic Energy Act of 1954 - Establishes Government-wide policies for classifying, safeguarding, and declassifying Restricted Data information. 10 CFR Part 1045 - establishes responsiblities and requirements for classifying and declassifying RD and FRD. Executive Order 13526, Classified National Security Information - Prescribes the

  20. Dampers for Natural Draft Heaters: Technical Report

    SciTech Connect (OSTI)

    Lutz, James D.; Biermayer, Peter; King, Derek

    2008-10-27

    Energy required for water heating accounts for approximately 40percent of national residential natural gas consumption in California. With water heating contributing such a substantial portion of natural gas consumption, it is important to pay attention to water heater efficiencies. This paper reports on an investigation of a patented, buoyancy-operated flue damper. It is an add-on design to a standard atmospherically vented natural-draft gas-fired storage water heater. The flue damper was expected to reduce off-cycle standby losses, which would lead to improvements in the efficiency of the water heater. The test results showed that the Energy Factor of the baseline water heater was 0.576. The recovery efficiency was 0.768. The standby heat loss coefficient was 10.619 (BTU/hr-oF). After the damper was installed, the test results show an Energy Factor for the baseline water heater of 0.605. The recovery efficiency was 0.786. The standby heat loss coefficient was 9.135 (BTU/hr-oF). The recovery efficiency increased 2.3percent and the standby heat loss coefficient decreased 14percent. When the burner was on, the baseline water heater caused 28.0 CFM of air to flow from the room. During standby, the flow was 12.4 CFM. The addition of the damper reduced the flow when the burner was on to 23.5 CFM. During standby, flow with the damper was reduced to 11.1 CFM. The flue damper reduced off-cycle standby losses, and improved the efficiency of the water heater. The flue damper also improved the recovery efficiency of the water heater by restricting on-cycle air flows through the flue.With or without the flue damper, off-cycle air flow upthe stack is nearly half the air flow rate as when the burner is firing.

  1. Department of Energy draft copy FOIA Report 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy draft copy FOIA Report 2010 Department of Energy draft copy FOIA Report 2010 Draft_of_2010_Chief_FOIA_Officers_Report-v3_Morman_edits5.pdf Department of Energy Chief Freedom of Information Act (FOIA) Officer Report for FY2010 PDF icon Department of Energy draft copy FOIA Report 2010 More Documents & Publications Chief Freedom of Information Act (FOIA) Officer Report for FY2009 DOE Chief FOIA Officer Reports Office of Information Resources (MA-90)

  2. Energy Department Releases New Greenhouse Gas Reporting Guidance, Seeks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Public Comment | Department of Energy Greenhouse Gas Reporting Guidance, Seeks Public Comment Energy Department Releases New Greenhouse Gas Reporting Guidance, Seeks Public Comment March 22, 2005 - 10:54am Addthis Program Will Ensure Greater Accuracy & Completeness WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today asked for further public comment on its revised guidelines for voluntary reporting of greenhouse gas emissions, sequestration and emission reductions. The program

  3. MHK LCOE Reporting Guidance Draft | OpenEI Community

    Open Energy Info (EERE)

    details on the Reference Models can be found here. The presentation was created in Microsoft Powerpoint, therefore it is recommended that Microsoft Powerpoint or Powerpoint...

  4. Toxic Chemical Release Inventory reporting ``Qs & As``. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This document offers guidance on toxic chemical release inventory reporting, pursuant to Section 313 of the Emergency Planning and Community Right-to-Know Act (EPCRA) at DOE sites.

  5. Energy Policy Act of 2005, Section 1813, Draft Report to Congress...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Policy Act of 2005, Section 1813, Draft Report to Congress: Federal Register Notice ... Notice of publication of draft report to Congress: Section 1813 of the Energy Policy Act ...

  6. 2010 Workforce Analysis and Staffing Plan Report Memo, Guidance and

    Energy Savers [EERE]

    Template | Department of Energy Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2010 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy Federal Technical Capability Order, DOE 0 426.1, requires that managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce

  7. 2013 Workforce Analysis and Staffing Plan Report Memo, Guidance and

    Energy Savers [EERE]

    Template | Department of Energy Workforce Analysis and Staffing Plan Report Memo, Guidance and Template 2013 Workforce Analysis and Staffing Plan Report Memo, Guidance and Template The Department of Energy Federal Technical Capability Order, DOE 0 426.1, requires that managers perform an annual workforce analysis of their organization and develop staffing plans that identify technical capabilities and positions they need to ensure safe operation of defense nuclear facilities. This workforce

  8. Facility Safety Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Safety Policy, Guidance & Reports Facility Safety Policy, Guidance & Reports The Office of Nuclear Facility Safety Programs within the U.S. Department of Energy's (DOE) Environment, Health, Safety and Security organization, establishes nuclear safety requirements related to safety management programs that are essential to the safety of DOE nuclear facilities. In addition, establishes requirements for facility design and operation for facility-wide hazards that are not unique to

  9. Draft Energy Sector Cybersecurity Framework Implementation Guidance Available for Public Comment

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued a Notice of Public Comment in the Federal Register, inviting the public to comment on DOE's Energy Sector Cybersecurity Framework Implementation Guidance. The document is available for a 30 day comment period.

  10. Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table

  11. DRAFT

    National Nuclear Security Administration (NNSA)

    Environmental Assessment for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Molybdenum-99 (DOE/EA-1929) Prepared for U.S. Department of Energy National Nuclear Security Administration Defense Nuclear Nonproliferation/ Global Threat Reduction Initiative July 2012 EA for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Mo-99 DRAFT ii This Page Intentionally Left Blank EA for NorthStar Medical Technologies LLC

  12. Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports

    Broader source: Energy.gov [DOE]

    Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports (ASER); ASER Formats

  13. POLICY GUIDANCE MEMORANDUM #22 Inappropriate Use of Credit Reports |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2 Inappropriate Use of Credit Reports POLICY GUIDANCE MEMORANDUM #22 Inappropriate Use of Credit Reports As a result of recent Human Capital Management Accountability Program audit findings, we have discovered that some Servicing Human Resources Offices (SHROs) are obtaining credit reports on applicants that have been certified for referral on selection certificates, and/or using this information to eliminate candidates from being certified for consideration, or

  14. Reporting Guidance for Federal Agency Annual Report on Energy Management (Per 42 U.S.C. 8258)

    Broader source: Energy.gov [DOE]

    Guidance includes four attachments that were developed to assist agencies with their reporting requirements.

  15. Draft FY 2012 Agency Financial Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Foreword he Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports to provide performance, financial and related information in a more meaningful and useful format. For Fiscal Year (FY) 2015, the Department of Energy (Department or DOE), has produced an Agency Financial Report, and will provide an Annual Performance Report and a Summary of Performance and Financial Information, pursuant to OMB

  16. Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance Semi-Annual Davis-Bacon Act Enforcement Report Form...

  17. DRAFT DRAFT DRAFT DRAFT DRAFT 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Input 7/19/12 DRAFT DRAFT DRAFT DRAFT DRAFT 1 Hanford Advisory Board Values DRAFT, April 11, 2012  Protect the Columbia River * The Columbia River is a local, regional and national treasure. Cleanup actions must protect the river now and forever into the future. o The Board continues to support the strategy to prioritize cleanup along the Columbia River corridor. DOE should complete this work as expeditiously as possible and achieve a standard of unrestricted use throughout the River

  18. Geothermal Energy R&D Program Annual Progress Report for Fiscal Year 1989 Draft

    SciTech Connect (OSTI)

    1990-04-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE -2005)

  19. Energy Sector Cybersecurity Framework Implementation Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    invites public comment on a draft of the Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October 14, 2014. The draft document...

  20. Draft Guidance: Response, Remediation, and Recovery Checklist for Chemically Contaminated Facilities

    SciTech Connect (OSTI)

    Raber, E; Mancieri, S; Carlsen, T; Fish, C; Hirabayashi-Dethier, J; Intrepido, A; MacQueen, D; Michalik, R; Richards, J

    2007-09-04

    A key part of preparedness in the event of a chemical warfare agent (CWA) or toxic industrial chemical (TIC) release at a large facility, such as an airport or subway, is to develop a concept of operations that allows for an effective incident response and recovery. This document is intended as a component of the concept of operations and will be used in the Emergency Operations Center (EOC) as a decision tool for the Unified Command (UC). The Checklist for Facility Response, Remediation, and Recovery presented in this document is principally focused on the Consequence Management Phase (see Figure 1; LLNL 2007a and 2007b) of a chemical release. Information in this document conforms to the National Response Plan (NRP) (DHS 2004) and the National Incident Management System (NIMS 2004). Under these two guidance documents, personnel responsible for managing chemical response and recovery efforts--that is, the decision-makers--are members of an Incident Command (IC), which is likely to transition to a UC in the event of a CWA or TIC attack. A UC is created when more than one agency has incident jurisdiction or when incidents cross political jurisdictions. The location for primary, tactical-level command and management is referred to as the Incident Command Post (ICP), as described in the NRP. Thus, regardless of whether an IC or a UC is used, the responsible entities are located at an ICP. Agencies work together through designated members of the UC to establish their designated Incident Commanders at a single ICP and to establish a common set of objectives and strategies and a single Incident Action Plan. Initially during the Crisis Management Phase (see Figure 1), the Incident Commander is likely to be the Chief of the fire department that serves the affected facility. As life-safety issues are resolved and the Crisis Management Phase shifts to the Consequence Management Phase, the work of characterization, decontamination, and facility clearance begins. There will likely be a coincident transition in organizational structure as well, and new remediation-focused groups, units, and personnel will be added as remediation needs are anticipated. In most cases, a UC would be formed, if not formed already, to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The UC would likely include the Transportation Facility Manager or Emergency Operations Manager; representatives from state and local public health, environmental, and emergency management agencies; and Federal agencies, such as the U.S. Environmental Protection Agency.

  1. Tank waste decision analysis report. Draft

    SciTech Connect (OSTI)

    Johnson, M.E.; Grygiel, M.L.; Baynes, P.A.; Bekemeier, J.P.; Zimmerman, B.D.; Triplett, M.B.

    1993-03-31

    The Assistant Secretary for Environmental Restoration and Waste Management and the director of the Washington State Department of Ecology agreed to the need to re-evaluate treatment and disposal plans for Hanford Site tank waste. Re-evaluation of the tank waste treatment and disposal plans (referred to as rebaselining) was necessary to (1) provide an integrated system approach for achieving safe storage, (2) resolve tank safety issues, and (3) treat and dispose of all Hanford Site tank waste. Rebaselining evaluated new approaches to remediate Hanford Site tank waste and, thus, reaffirm existing plans or recommend a new technical strategy. To facilitate this integrated system approach for managing the program elements, the US Department of Energy formed the Tank Waste Remediation System (TWRS). While conducting this re-evaluation, the US Department of Energy agreed to continue supporting the existing plan for treatment and disposal of Hanford Site tank waste. The selection of a proposed new technical strategy for the TWRS Program is a complex task involving the evaluation of a large body of data. The data that is available to support the selection of a proposed new technical strategy is based on engineering estimates and preliminary technology development. To accommodate this complex, dynamic situation, a systems engineering approach is being applied to structure and analyze technical strategies and to manage the TWRS Program. Systems engineering is a generalized and systematic methodology for defining problems, evaluating solutions, and implementing the solutions. This report describes the development of the TWRS Program systems engineering analysis, the analytical methodologies that support it, and the results of the analyses that were used to define the proposed new technical strategy.

  2. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REPORT NUCLEAR WORKFORCE SUMMIT Sponsored by the Savannah River Site Community Reuse ... SRS or operators at a nuclear power plant, and eventually become a licensed operator. ...

  3. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REPORT NUCLEAR WORKFORCE SUMMIT Sponsored by the Savannah River Site Community Reuse Organization (SRSCRO) Prepared By: MAS Consultants, Inc. June 29, 2009 SRSCRO Nuclear Workforce Summit Summary Report MAS Consultants Inc. 1 June 29, 2009 BACKGROUND The Savannah River Site Community Reuse Organization (SRSCRO) is charged with developing and implementing a comprehensive strategy to diversify the economy of the five-county SRSCRO region in the CSRA. The SRSCRO recognized that existing industry

  4. Guidance for identifying, reporting and tracking nuclear safety noncompliances

    SciTech Connect (OSTI)

    1995-12-01

    This document provides Department of Energy (DOE) contractors, subcontractors and suppliers with guidance in the effective use of DOE`s Price-Anderson nuclear safety Noncompliance Tracking System (NTS). Prompt contractor identification, reporting to DOE, and correction of nuclear safety noncompliances provides DOE with a basis to exercise enforcement discretion to mitigate civil penalties, and suspend the issuance of Notices of Violation for certain violations. Use of this reporting methodology is elective by contractors; however, this methodology is intended to reflect DOE`s philosophy on effective identification and reporting of nuclear safety noncompliances. To the extent that these expectations are met for particular noncompliances, DOE intends to appropriately exercise its enforcement discretion in considering whether, and to what extent, to undertake enforcement action.

  5. Appendix A Scoping Summary Report and Response to Draft EIS Comments Report

    Energy Savers [EERE]

    Appendix A Scoping Summary Report and Response to Draft EIS Comments Report Final EIS Keystone Pipeline Project FINAL COMMENT RESPONSE REPORT December 27, 2007 Introduction The Role of Public Comment The National Environmental Policy Act (NEPA) is intended to facilitate improved government decisions relative to the environmental effects of proposed developments. NEPA does not dictate protection of the environment, but instead assumes that common sense and good judgment will result in the

  6. Worker Health & Safety Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Worker Health & Safety Policy, Guidance & Reports Worker Health & Safety Policy, Guidance & Reports The Office of Worker Safety and Health Policy establishes Departmental expectations for worker safety and health through the development of rules, directives and guidance. Worker safety and health policy will ensure that workers are adequately protected from hazards associated with DOE sites and operations and reflect national worker safety and health laws, regulations and

  7. Guidance manual for hazardous waste incinerator permits. Final report

    SciTech Connect (OSTI)

    Not Available

    1983-07-01

    The manual provides guidance to the permit writer for designating facility - specific operating conditions necessary to comply with the RCRA standards for hazardous waste incinerators. Each section of the incineration regulation is addressed, including: waste analysis, designation of principal organic hazardous constituents and requirements for operation, inspection and monitoring. Guidance is also provided for evaluating incinerator performance data and trial burn procedures.

  8. Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports

    Energy Savers [EERE]

    June 2015 Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports ii Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports TABLE OF CONTENTS 1.0 BACKGROUND ................................................................................................................ 1 1.1 Public Information Source ...............................................................................................2 1.2 Coordination and

  9. Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Land Rights-of-Way Study | Department of Energy Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study The U.S. Department of the Interior (DOI) and U.S. Department of Energy (DOE) (Departments) provide this report to Congress pursuant to Section 1813 of Public Law (Pub. L.) 109-58, the Energy Policy Act of 2005 (EPAct). PDF icon Draft Report to Congress:

  10. Guidance on the Consideration of Past Actions in Cumulative Effects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information, Final Rule DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions CEQ Guidance on the Application of NEPA to ...

  11. Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance Guidance NEPA Guidance by Agency Council on Environmental Quality Department of Energy Environmental Protection Agency Other NEPA Guidance and Reports NEPA Guidance by Topic Analysis of Environmental Impacts Categorical Exclusions Cooperating Agencies Cumulative Impacts Document Preparation DOE-Wide NEPA Contracting Emergencies and Emergency Actions Environmental Justice General Guidance on NEPA NEPA History NEPA Implementation NEPA and Other Laws NEPA Policy Public Participation

  12. Draft 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Nuclear Energy and report its findings, recommendations, comments, and guidance to NEAC and the Assistant Secretary for Nuclear Energy. Subcommittee Membership: The Chair ...

  13. Microsoft Word - SGIG DOE REPORTING GUIDANCE 09202011.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    status reports to assist DOE in its reporting requirements under the Recovery Act. Field Definition Metrics Field Type ACWP Actual Cost of Work Performed The cost actually...

  14. Energy Department Releases New Greenhouse Gas Reporting Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    further public comment on its revised guidelines for voluntary reporting of greenhouse ... "These revised guidelines represent another significant step in our broad national effort ...

  15. Microsoft Word - Final MELCOR Guidance Report Version May 3 2004...

    Office of Environmental Management (EM)

    ... Sandia National Laboratory MELCOR website: ... 1997. CRC, 1986, Handbook of Chemistry and Physics, 67th Edition, CRC Press, 1986. DOE ... Nuclear Facility Safety Reports, ...

  16. Draft Letter on the Final Report of the Commission to review the Effectiveness of the National Energy Laboratories

    Broader source: Energy.gov [DOE]

    This draft letter of the National Laboratory Task Force transmits the comments of its National Laboratories Task Force on thefinal report of the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL).

  17. Draft RSO Deeming Guidance Document 1 DRAFT RSO Deeming Guidance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA recognizes that there is volatility in loads and generally little flexibility in hydro operations during certain times of year (e.g., September and October). BPA will take...

  18. Microsoft Word - third draft letter report.doc

    Office of Legacy Management (LM)

    STAR Center south across Bryan Dairy Road onto private property. The results of a previous sampling event at 10980 Belcher Road in August 2010 were reported in the Data Report ...

  19. Draft Report of the Task Force on Methane Hydrates

    Broader source: Energy.gov [DOE]

    This report presents the findings and recommendations for the Secretary of Energy Advisory Board (SEAB) Task Force on Methane Hydrates.

  20. Lessons Learned Quarterly Report, Test Edition

    Broader source: Energy.gov [DOE]

    Welcome to the test edition of the Lessons Learned Quarterly Report. This edition features revised draft guidance on greenhouse gas emissions and climate change,  new flood risk management...

  1. DRAFT REMEDIAL DESIGN REPORT/REMEDIAL ACTION WORK PLAN

    Office of Legacy Management (LM)

    Annual Land-Use Covenant Inspection Report for DOE Areas at the Laboratory for Energy-Related Health Research/Old Campus Landfill Superfund Site University of California, Davis January 2016 LMS/LEH/S13715 This page intentionally left blank REPORT DISTRIBUTION John Bystra State of California Department of Toxic Substances Control 8800 Cal Center Drive Sacramento, CA 95826 Scott Surovchak U.S. Department of Energy Office of Legacy Management 11025 Dover Street, Suite 1000 Westminster, CO 80021 Sue

  2. Draft of final report for the aerocapacitor TRP

    SciTech Connect (OSTI)

    Hair, L.M. [Lawrence Livermore National Lab., CA (United States)

    1996-08-23

    This report summarizes work done at LLNL for the development of the aerocapacitor in a collaborative effort between LLNL, PowerOne and PolyStor. The overall goal was to demonstrate a cost competitive manufacturing process for the use of carbon aerogels in a capacitor component suitable for incorporation in power supplies. In this report the authors feature several categories of work, including progress specifically in the areas of collaboration with their industrial partners, in the construction and testing of the aerocapacitors, and in the development and characterization of the aerogel materials.

  3. Regulatory impact analysis for the petroleum refineries neshap. Draft report

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The report analyzes the regulatory impacts of the Petroleum Refinery National Emission Standard for Hazardous Air Pollutants (NESHAP), which is being promulgated under Section 112 of the Clean Air Act Amendments of 1990 (CCA). This emission standard would regulate the emissions of certain hazardous air pollutants (HAPs) from petroleum refineries. The petroleum refineries industry group includes any facility engaged in the production of motor gasoline, naphthas, kerosene, jet fuels, distillate fuel oils, residual fuel oils, lubricants, or other products made from crude oil or unfinished petroleum derivatives. The report analyzes the impact that regulatory action is likely to have on the petroleum refining industry.

  4. Development of a prototype lignin concentration sensor. Final report. Draft

    SciTech Connect (OSTI)

    Jeffers, L.A.

    1994-11-01

    The ultimate objective of the DOE-sponsored program discussed in this report is to commercialize an instrument for real-time, in-situ measurement of lignin in wood pulp at a variety of locations in the pulp process stream. The instrument will be used as a primary sensor for process control in the pulp and paper industry. Work done by B&W prior to the initiation of this program had shown: there is a functional relationship between the fluorescence intensity and the Kappa number as measured at the pulp mill laboratory. Kappa number is a standard wet chemical method for determination of the lignin concentration; the relationship is one of decreasing intensity with Kappa number, indicating operation in the quenched fluorescence regime; a great deal of scatter in the data. Because of the preliminary nature of the study, the origin of the scatter was not identified. This report documents the results of laboratory measurements made on a variety of well defined pulp samples to generate the data necessary to: determine the feasibility of an instrument for on-line lignin concentration measurement using laser fluorescence; identify the preferred measurement strategy; define the range of applicability of the instrument; and to provide background information to guide the design of a field-worthy prototype.

  5. Interagency Geothermal Coordinating Council fifth annual report. Final draft

    SciTech Connect (OSTI)

    Abel, Fred H.

    1981-07-07

    Geothermal energy is the natural heat of the earth, and can be tapped as a clean, safe, economical alternative source of energy. Much of the geothermal energy resource is recoverable with current or near-current technology and could make a significant contribution both to increasing domestic energy supplies and to reducing the US dependence on imported oil. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural process applications. This report describes the progress for fiscal year 1980 (FY80) of the Federal Geothermal Program. It also summarizes the goals, strategy, and plans which form the basis for the FY81 and FY82 program activities and reflects the recent change in national policy affecting Federal research, development and demonstration programs. The Interagency Geothermal Coordinating Council (IGCC) believes that substantial progress can and will be made in the development of geothermal energy. The IGCC goals are: (1) reduce the institutional barriers so that geothermal projects can be on-line in one-half the current time; (2) make moderate temperature resources an economically competitive source of electricity; (3) remove the backlog of noncompetitive lease applications; (4) competitive lease all KGRA lands; and (5) cut the cost of hydrothermal technology by 25%.

  6. Engineered alternatives cost/benefit study. Draft report

    SciTech Connect (OSTI)

    1995-09-01

    The Waste Isolation Pilot Plant (WIPP) is a United States Department of Energy (DOE) project designed to demonstrate the safe disposal of Transuranic (TRU) waste in deep, geologic, bedded salt. The WIPP site is located in southeastern New Mexico. By law the WIPP site has been withdrawn from public use and has been set aside for use in the safe disposal of TRU waste. Also by law, disposal of TRU waste must comply with rules and regulations promulgated by the U.S. Environmental Protection Agency (EPA). The disposal system design consists of multiple barriers, both natural and man-made, located in a geologic salt deposit, 2,150 feet (655.3 meters) below ground. These barriers were selected because of their ability to permanently isolate the waste from the accessible environment as required to comply with subparts B and C of Title 40 Code of Federal Regulations Part 191 (40 CFR 191). As a part of the assurance requirements, 40 CFR {section}191.14 requires that barriers of different types shall be used to isolate the waste. The WIPP design uses both a geologic (natural) and engineered barriers for waste isolation as specified by these regulations. However, to provide additional confidence in containment prediction calculations used to demonstrate compliance with the containment requirements, Engineered Alternatives (EA) could be used as additional assurance measures beyond those used to meet the containment requirements. This report uses the term EA to represent engineered barriers that are technically feasible processes, technologies, methods, repository designs, or waste from modifications which make a significant positive impact on the disposal system in terms of reducing uncertainty in performance calculations or improving long-term performance. These EAs, if used, function as barriers to the release of radioactive material.

  7. Draft Sample Collection Instrument | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Sample Collection Instrument Draft Sample Collection Instrument Davis-Bacon Semi-annual Labor Compliance Report OMB Control Number 1910-New PDF icon dbacollectioninstrument...

  8. CEQ Issues Guidance on Improving NEPA Process Efficiency | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by reference; expediting responses to comments; and clear timelines for NEPA reviews. ... Efficiency CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate Change

  9. Guidance on the Consideration of Past Actions in Cumulative Effects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Actions in the United States with Transboundary Effects Revised DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions (DOE, 2014)

  10. Federal Register - Document Drafting Handbook | Open Energy Informatio...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Federal Register - Document Drafting HandbookPermittingRegulatory...

  11. DRAFT FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES

    Broader source: Energy.gov [DOE]

    The Commission has reviewed comments received during the public comment period and revised its draft Final Report Volumes 1 and 2 for final consideration and approval. The revised version of the draft Final Report is available for download below. A public conference call has been set for 1:00 pm, Oct 23rd to discuss the comments received, to receive additional public comment, and to approve the final report. Further details regarding the conference call can be found here and in the Federal Register. Section 319 of the Consolidated Appropriations Act, 2014 (Public Law No. 113-76) directed the Secretary of Energy to establish the Commission to Review the Effectiveness of the National Energy Laboratories. The Commission was charged with reviewing the 17 Department of Energy (DOE) National Laboratories. It was established in May 2014 and held monthly meetings from July 2014 to July 2015. Congress directed the Commission to evaluate the laboratories in terms of their alignment with the Departments strategic priorities, duplication, ability to meet current and future energy and national security challenges, size, and support of other Federal agencies. The Commission was also to review the efficiency and effectiveness of the laboratories, including assessing overhead costs and the impact of DOEs oversight and management approach. Lastly, Congress had several specific questions related to the use of laboratory directed research and development (LDRD) such as the effectiveness of the Departments oversight approach and the extent to which LDRD funding supports recruiting and retention of qualified staff. The Commission separated its charge into two phases. Phase 1 focused on the mission and strategic planning of the laboratories and Phase 2 targets the operation and oversight of the laboratory system. LDRD as it relates to the issues outlined above was considered in both phases of the Commissions task. The Commission issued an Interim Report in February 2015 with its preliminary observations and recommendations.

  12. Energy Policy Act of 2005, Section 1813, Draft Report to Congress: Federal Register Notice Volume 71, No. 153- Aug. 9, 2006

    Broader source: Energy.gov [DOE]

    Notice of publication of draft report to Congress: Section 1813 of the Energy Policy Act of 2005 (Pub. L. 109–58) requires the Department of the Interior and the Department of Energy (Departments)...

  13. NEAC Facilities Subcommittee DRAFT Report 6/8/2015 Subcommittee members: John Ahearne, Dana Christensen, Tom Cochran, Mike Corradini, Dave

    Energy Savers [EERE]

    DRAFT Report 6/8/2015 Subcommittee members: John Ahearne, Dana Christensen, Tom Cochran, Mike Corradini, Dave Hill, Hussein Khalil, Andy Klein, Paul Murray, John Sackett (chair) Teams from the NEAC Facilities Subcommittee visited Argonne National Laboratory, Idaho National Laboratory and Oak Ridge National Laboratory to assess the state and availability of nuclear facilities appropriate to further development of nuclear technology. In addition, a survey was conducted of nuclear facility

  14. DRAFT SEAB LETTER ON THE COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES REPORT

    Broader source: Energy.gov [DOE]

    The SEAB National Laboratory Task Force has been charged to review studies of the DOE National Laboratories as they appear and to give you advice about what your response should be to their findings and recommendations. This Draft SEAB letter transmits the comments of its National Laboratories Task Force on the recently released report of the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL), entitled Securing Americas Future: Realizing the Potential of the DOEs National Laboratories. That committee, co-chaired by TJ Glauthier and Jared Cohen, was formed pursuant to Section 319 of the Consolidated Appropriations Act, 2014 (Public Law No. 113-76), and was charged to evaluate the laboratories alignment with the Departments strategic priorities, duplication, ability to meet current and future energy and national security challenges, size, and support of other Federal agencies,the efficiency and effectiveness of the laboratories, including assessing overhead costs and the impact of DOEs oversight and management approach,the effectiveness of the Departments oversight approach and the extent to which LDRD funding supports recruiting and retention of qualified staff.

  15. Draft Specifications for Application of UNFC-2009 to Renewable...

    Open Energy Info (EERE)

    Draft Specifications for Application of UNFC-2009 to Renewable Energy Resources Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Draft Specifications for...

  16. Recommendations: Draft 2013 Annual Plan | Department of Energy

    Energy Savers [EERE]

    URTAC - Recommendations on Draft 2013 Section 999 Annual Plan PDF icon URTAC - Recommendations on Draft 2013 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 Recommendations: Draft Annual Plan Committee Report for December 18, 2013 Meeting

  17. Enforcement Guidance Supplement 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGS), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors.

  18. Enterprise Assessments Operational Awareness Record for the Review of the Hanford Site Waste Treatment and Immobilization Plant Low-Activity Facility Wide Draft Hazard Analysis Report – June 2015

    Broader source: Energy.gov [DOE]

    Operational Awareness Record for the Review of the Waste Treatment and Immobilization Plant Low-Activity Facility-Wide Draft Hazard Analysis Report

  19. Site Transition Plan Guidance | Department of Energy

    Energy Savers [EERE]

    Plan Guidance Site Transition Plan Guidance Site Transition Plan Guidance PDF icon Site Transition Plan Guidance More Documents & Publications Development of Site Transition Plan, Use of the Site Transition Framework, and Terms and Conditions for Site Transition Reporting Pre-guidance Announcement 06-02-2011 Letter to SEP Recipients on Changes to Reporting Requirements

  20. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect (OSTI)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  1. Technical Guidance

    Broader source: Energy.gov [DOE]

    The Office of Technical Guidance, within the Office of Health, Safety and Security develops and issues Government-wide and Department-wide technical guidance to ensure that classified nuclear...

  2. Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005

    Broader source: Energy.gov [DOE]

    The articles in this collection, organized by topic, contain procedural interpretations and recommendations developed by the DOE Office of NEPA Policy and Compliance in consultation with the Office of General Counsel, the DOE NEPA Community, and others. The mini-guidance articles were developed to address problems identified in the course of preparing, reviewing, and issuing NEPA documents.

  3. Recommendations: Draft Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan Recommendations: Draft Annual Plan Section 999 Annual Plan PDF icon Recommendations on Draft 2014 Section 999 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 Committee Report for December 18, 2013 Meeting Recommendations: Draft 2013 Annual Plan

  4. DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee Report Energy storage ... Groups Manual Review Key Documents Battery Pack Requirements and Targets ...

  5. DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report: Revision 2 DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee Report: ... More Documents & Publications Battery Pack Requirements and Targets Validation FY 2009 ...

  6. Draft ITER USIPO INTERIM Export Control Guidance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Date of Message 10192007 Reference Number ITR1007 Content COMMODITY CLASSIFICATION UNITED STATES DEPARTMENT OF COMMERCE BUREAU OF INDUSTRY AND SECURITY WASHINGTON, D.C. 20230 ...

  7. Energy Sector Cybersecurity Framework Implementation Guidance- Notice of Public Comment: Federal Register Notice, Volume 79, No. 177, September 12, 2014

    Broader source: Energy.gov [DOE]

    The Department of Energy invites public comment on a draft of the Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October 14, 2014.

  8. Vermont Public Service Board Draft Guide to Filing a Petition...

    Open Energy Info (EERE)

    Board Draft Guide to Filing a Petition under Section 248 Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont...

  9. SEP Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GUIDANCE Eligibility of revolving loan funds A revolving loan fund is an eligible use ... installation of energy efficiency and renewable energy measures" and comply with all ...

  10. Hazardous Substance Release Reporting Under CERCLA, EPCR {section}304 and DOE Emergency Management System (EMS) and DOE Occurrence Reporting Requirements. Environmental Guidance

    SciTech Connect (OSTI)

    Traceski, T.T.

    1994-06-01

    Releases of various substances from DOE facilities may be subject to reporting requirements under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Emergency Planning and Community Right-to-Know Act (EPCRA), as well as DOE`s internal ``Occurrence Reporting and Processing of Operations Information`` and the ``Emergency Management System`` (EMS). CERCLA and EPCPA are Federal laws that require immediate reporting of a release of a Hazardous Substance (HS) and an Extremely Hazardous Substance (EHS), respectively, in a Reportable Quantity (RQ) or more within a 24-hour period. This guidance uses a flowchart, supplemental information, and tables to provide an overview of the process to be followed, and more detailed explanations of the actions that must be performed, when chemical releases of HSs, EHSs, pollutants, or contaminants occur at DOE facilities. This guidance should be used in conjunction with, rather than in lieu of, applicable laws, regulations, and DOE Orders. Relevant laws, regulations, and DOE Orders are referenced throughout this guidance.

  11. Geothermal energy planning and communication for native Americans. Final report. Draft

    SciTech Connect (OSTI)

    Robertson, T.A.

    1982-03-30

    The purpose was to explore and develop geothermal energy resources on Indian lands. Activities included the following: (1) continued review of Indian communities and their potential for geothermal energy development; (2) introduced tribes to the availability of geothermal energy and removed the barriers to the implementation of this energy source; (3) provided information by telephone and by mailing packages of information; (4) published articles on geothermal energy development in the UIPA newsletter and supplied articles to other Indian publication; (5) conducted two seminars specific to geothermal energy development on Indian lands in western states; (6) carried out survey of Indian attitudes and opinions toward energy in general and geothermal energy in specific; (7) incorporated geothermal energy development information in Economic Development Administration sponsored tribal government management programs, and (8) developed draft written material addressing Indian planning problems and supporting their ability to affect a more productive working relationship with government agencies and reduced dependency.

  12. Audit Report: ER-B-96-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Audit Report: ER-B-96-01 April 23, 1996 Force Restructuring at the Fernald Environmental Management Project PDF icon Audit Report: ER-B-96-01 More Documents & Publications Audit Report: ER-B-98-06 Semiannual Report to Congress: April 1, 1996 - September 30, 1996 Draft Policy and Planning Guidance for Community Transition Activities

  13. Draft Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2, 2016 DRAFT MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE February 2, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 HAB Report Summary

  14. Microsoft Word - Draft Comprehensive Evaluation News Release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    208-378-5101 Draft report from Federal agencies shows gains for Columbia River Basin fish Portland, Ore. - Federal agencies and their partners outlined today five years of...

  15. QA in Design Guidance | Department of Energy

    Energy Savers [EERE]

    in Design Guidance QA in Design Guidance This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM. PDF icon QA in Design Guidance More Documents & Publications Audit Report: IG-0863 Line Management Understanding of QA and Oversight Requirements Flowdown and Graded Approach to QA

  16. Lessons Learned Quarterly Report, March 2015

    Broader source: Energy.gov [DOE]

    Welcome to the 82nd quarterly report on lessons learned in the NEPA process. This issue features recently issued Council on Environmental Quality (CEQ) revised draft guidance on considering greenhouse gas emissions and climate change in NEPA reviews, and a new Executive Order that establishes a federal flood risk management standard to respond to climate change.

  17. Audit Report: ER-B-95-06 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Audit Report: ER-B-95-06 August 3, 1995 Audit of Work Force Restructuring at the Oak Ridge Operations Office PDF icon Audit Report: ER-B-95-06 More Documents & Publications Audit Report: ER-B-96-01 Draft Policy and Planning Guidance for Community Transition Activities Authorize_Changes_Contractor_Work_Force_Restructuring_Policy.pdf

  18. State Energy Program Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance State Energy Program Guidance The State Energy Program (SEP) has released the following guidance documents, listed chronologically below, that explain how states must report and manage SEP program funding. More program guidance documents are available on the Recovery Act Guidance by Topic page. Congress authorized the U.S. Department of Energy (DOE) to allow for formula and competitive grants and cooperative agreements under the Energy Policy and Conservation Act of 1975, section 365(f)

  19. Reporting Pre-guidance Announcement 06-02-2011 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Letter to SEP Recipients on Changes to Reporting Requirements Microsoft Word - T4VEICTO2 Sub3Residential Retrofit Program Design Guide Play BookTEAM 4 FINAL.docx Proceedings ...

  20. Guidance on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program

    Broader source: Energy.gov [DOE]

    This document provides guidance and clarifies the required period for obligation of funds as established in the Energy Efficiency Conservation Block Grant (EECBG) Program Funding Opportunity Announcements (FOAs) Number DE-FOA-0000013 and DE-FOA-0000148, and to clarify the procedures for the reporting of funds obligated by the grantees.

  1. POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Guidance on Transition to Eliminate FCIP (Expired) POLICY GUIDANCE MEMORANDUM 19 Guidance on Transition to Eliminate FCIP (Expired) THIS GUIDANCE HAS EXPIRED Guidance on the...

  2. Microsoft Word - Edited A-08-03 draft final report.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at (575) 234- 7423, should you have any questions concerning this audit report. Enclosure CBFO:QA:DSM:KBS:08-0337:UFC 2300.00 Sincerely, David C. Moody Manager Original Signature...

  3. Microsoft Word - Edited A-08-03 draft final report.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 16, 2008 Mr. Steve Zappe, Project Leader Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bldg. 1 Santa Fe, New Mexico 87505-6303 Subject: Transmittal of the Certification Audit Report for Argonne National Laboratory Audit A-08-03 Dear Mr. Zappe: This letter transmits the Argonne National Laboratory Audit Report for the processes performed to characterize and certify waste as required by Section II.C.2.c of the WIPP Hazardous Waste Facility Pennit. The

  4. Memorandum Guidance for the Preparation of Department of Energy...

    Energy Savers [EERE]

    Guidance for the Preparation of Department of Energy (DOE) Annual Site Environmental reports (ASERs) for Calendar Year 2014 Memorandum Guidance for the Preparation of Department of ...

  5. Guidance for Preparation of the 2014 Department of Energy Annual...

    Office of Environmental Management (EM)

    Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental ...

  6. Antarctica X-band MiniSAR Crevasse Detection Radar : draft final report.

    SciTech Connect (OSTI)

    Sander, Grant J.; Bickel, Douglas Lloyd

    2010-08-01

    This document is the final report for the 2009 Antarctica Crevasse Detection Radar (CDR) Project. This portion of the project is referred to internally as Phase 2. This is a follow on to the work done in Phase 1 reported on in [1]. Phase 2 involved the modification of a Sandia National Laboratories MiniSAR system used in Phase 1 to work with an LC-130 aircraft that operated in Antarctica in October through November of 2009. Experiments from the 2006 flights were repeated, as well as a couple new flight tests to examine the effect of colder snow and ice on the radar signatures of 'deep field' sites. This document includes discussion of the hardware development, system capabilities, and results from data collections in Antarctica during the fall of 2009.

  7. Dallas area-wide intelligent transportation system plan. Draft research report, August 1992-August 1996

    SciTech Connect (OSTI)

    Carvell, J.D.; Seymour, E.J.; Walters, C.H.; Starr, T.R.; Balke, K.

    1996-07-01

    This report documents the development of a comprehensive plan for implementation of Intelligent Transportation Systems (ITS) in the Dallas Urban Area. The contract defined objectives: Develop a Broadly Based Steering Committee; Assess Existing Transportation Management Systems and Potential ITS Technology; Identify Institutional Issues and Legal Barriers; Develop an Implementable, Area-Wide Multi-Jurisdictional ITS Plan; and Develop Cost, Benefits, and an Implementation Plan.

  8. SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Semi-Annual Davis-Bacon Enforcement Report. Please submit the Semi-Annual Davis-Bacon Enforcement Report in the Performance and Accountability for Grants in Energy (PAGE) system. PDF icon Enforcement Report More Documents & Publications SEMI-ANNUAL DAVIS-BACON ENFORCEMENT REPORT Draft Sample Collection Instrument Semi-Annual Davis-Bacon Act Enforcement Report Form Guidance

  9. Hot dry rock geothermal energy for U.S. electric utilities. Draft final report

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    In order to bring an electric utility component into the study of hot dry rock geothermal energy called for in the Energy Policy Act of 1992 (EPAct), EPRI organized a one-day conference in Philadelphia on January 14,1993. The conference was planned as the first day of a two-day sequence, by coordinating with the U.S. Geological Survey (USGS) and the U.S. Department of Energy (DOE). These two federal agencies were charged under EPAct with the development of a report on the potential for hot dry rock geothermal energy production in the US, especially the eastern US. The USGS was given lead responsibility for a report to be done in association with DOE. The EPRI conference emphasized first the status of technology development and testing in the U.S. and abroad, i.e., in western Europe, Russia and Japan. The conference went on to address the extent of knowledge regarding the resource base in the US, especially in the eastern half of the country, and then to address some practical business aspects of organizing projects or industries that could bring these resources into use, either for thermal applications or for electric power generation.

  10. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    SciTech Connect (OSTI)

    Gasper, John R.; Veselka, Thomas D.; Mahalik, Matthew R.; Hayse, John W.; Saha, Samrat; Wigmosta, Mark S.; Voisin, Nathalie; Rakowski, Cynthia; Coleman, Andre; Lowry, Thomas S.

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  11. Regulatory analysis for the resolution of Unresolved Safety Issue A-44, Station Blackout. Draft report

    SciTech Connect (OSTI)

    Rubin, A.M.

    1986-01-01

    ''Station Blackout'' is the complete loss of alternating current (ac) electric power to the essential and nonessential buses in a nuclear power plant; it results when both offsite power and the onsite emergency ac power systems are unavailable. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on ac power, the consequences of a station blackout could be severe. Because of the concern about the frequency of loss of offsite power, the number of failures of emergency diesel generators, and the potentially severe consequences of a loss of all ac power, ''Station Blackout'' was designated as Unresolved Safety Issue (USI) A-44. This report presents the regulatory analysis for USI A-44. It includes: (1) a summary of the issue, (2) the proposed technical resolution, (3) alternative resolutions considered by the Nuclear Regulatory Commission (NRC) staff, (4) an assessment of the benefits and costs of the recommended resolution, (5) the decision rationale, and (6) the relationship between USI A-44 and other NRC programs and requirements.

  12. The cost of wetland creation and restoration. Final report, [February 12, 1992--April 30, 1994]- Draft

    SciTech Connect (OSTI)

    King, D.; Costanza, R.

    1994-07-11

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  13. Draft report on melt point as a function of composition for urania-based systems

    SciTech Connect (OSTI)

    Valdez, James A; Byler, Darrin D

    2012-06-08

    This report documents the testing of a urania (UO{sub 2.00}) sample as a baseline and the attempt to determine the melt point associated with 4 compositions of urania-ceria and urania-neodymia pseudo binaries provided by ORNL, with compositions of 95/5, and 80/20 and of (U/Ce)O{sub 2.00} and (U/Nd)O{sub 2.00} in the newly developed ceramic melt point determination system. A redesign of the system using parts fabricated from tungsten was undertaken in order to help prevent contamination and tungsten carbide formation in the crucibles. The previously developed system employed mostly graphite parts that were shown to react with the sample containment black-body crucible leading to unstable temperature readings and crucible failure, thus the redesign. Measured melt point values of UO{sub 2.00} and U{sub 0.95}Ce{sub 0.05}O{sub 2.00}, U{sub 0.80}Ce{sub 0.20}O{sub 2.00}, U{sub 0.95}Nd{sub 0.05}O{sub 2.00} and U{sub 0.80}Nd{sub 0.20}O{sub 2.00} were measured using a 2-color pyrometer. The value measured for UO{sub 2.00} was consistent with the published accepted value 2845 C {+-} 25 C, although a wide range of values has been published by researchers and will be discussed later in the text. For comparison, values obtained from a published binary phase diagram of UO{sub 2}-Nd{sub 2}O{sub 3} were used for comparison with our measure values. No literature melt point values for comparison with the measurements performed in this study were found for (U/Ce)O{sub 2.00} in our stoichiometry range.

  14. Revised Draft Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Import Statement, Richland, Washington - Summary

    Office of Environmental Management (EM)

    Energy Revised Draft Guidance for EPAct 2005 Section 242 Program Revised Draft Guidance for EPAct 2005 Section 242 Program In the Energy Policy Act of 2005 (EPAct 2005; Public Law 109-58) Congress established a new program to support the expansion of hydropower energy development at existing dams and impoundments through an incentive payment procedure. Under section 242 of EPAct 2005, the Secretary of Energy is directed to provide incentive payments to the owner or operator of qualified

  15. Procedural guidance for reviewing exposure information under RCRA (Resource Conservation and Recovery Act) section 3019. Final report

    SciTech Connect (OSTI)

    Grogan, T.; Kayser, R.

    1986-09-26

    This guidance manual describes the procedures for permit writers in evaluating exposure information submitted under Resource Conservation and Recovery Act (RCRA) Section 3019. The integration of the review with existing RCRA permitting activities is also discussed. The document outlines procedures to follow in referring sites to the Agency for Toxic Substances and Disease Registry (ATSDR) for health evaluations.

  16. Permit applicants' guidance manual for exposure information requirements under RCRA (Resource Conservation and Recovery Act) Section 3019. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-07-03

    The purpose of this document is to provide owners and operators of hazardous-waste landfills and surface impoundments that are subject to permitting under the Resource Conservation and Recovery Act (RCRA) with guidance for submitting information on the potential for public exposure to hazardous wastes, as required by Section 3019 of RCRA.

  17. DRAFT AUDIT REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Incurred and Claimed, to safeguard assets in its care, and to claim only allowable costs. ... resources while ensuring that the Department's contractors claim only allowable costs. ...

  18. Draft TUG Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as opposed to scheduling all their capacity. A generalized logistic function applied to the regression fit, the orange curve in Figure 5.11, results in a correlation...

  19. DRAFT INSPECTION REPORT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The pre-employment screening process includes identity verification, employment 3 and education validation, and drug testing, as well as reference, credit, and local law ...

  20. SUPPLEMENTAL GUIDANCE

    Office of Environmental Management (EM)

    SUMMIT_REPORT.pdf SUMMIT_REPORT.pdf PDF icon SUMMIT_REPORT.pdf More Documents & Publications Contract and Project Management Improvement (CPMI) Closure Report -- April 2012 Microsoft PowerPoint - 15.1200_Ferraro Audit Report: IG-0614

    812 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy

  1. Draft-O-Meter

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students will learn an easy technique to measure the presence of drafts in their homes and classrooms.

  2. Communications and Guidance

    Broader source: Energy.gov [DOE]

    Issued Guidance: Throughout the life of the Recovery Act, it has at times been necessary to issue guidance around certain policies or procedures.

  3. Audit Report: WR-B-97-05 | Department of Energy

    Energy Savers [EERE]

    7-05 Audit Report: WR-B-97-05 May 6, 1997 Audit of Work Force Restructuring Under Section 3161 of the National Defense Authorization Act PDF icon Audit Report: WR-B-97-05 More Documents & Publications Audit Report: WR-B-96-07 Draft Policy and Planning Guidance for Community Transition Activities Semiannual Report to Congress: April 1 - September 30, 1997

  4. Lessons Learned Quarterly Report, September 2014 | Department of Energy

    Energy Savers [EERE]

    4 Lessons Learned Quarterly Report, September 2014 Carousel Pictures - LANL Mitigation - Proposed Final .jpg Welcome to the 80th quarterly report on lessons learned in the NEPA process. This issue features the Los Alamos Field Office's use of a comprehensive mitigation action plan to monitor and manage commitments to mitigation measures. Articles in this issue include: Making the Most of Mitigation CEQ Draft Programmatic NEPA Review Guidance 2014 Stakeholders Directory CEQ Affirms Need To

  5. Draft 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Reactor Technologies, within the Office of Nuclear Energy and report their ... Subcommittee Membership: The Chair of the subcommittee shall be a member of the full ...

  6. Draft 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Fuel Cycle Technologies, within the Office of Nuclear Energy and report their ... Subcommittee Membership: The Chair of the subcommittee shall be a member of the full ...

  7. Microsoft Word - 2014 Annual Plan DRAFT 9-5-13

    Energy Savers [EERE]

    4 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress Draft September 2013 United States Department of Energy Washington, DC 20585 Department of Energy |Draft September 2013 Department of Energy |Draft September 2013 Executive Summary This 2014 Annual Plan is the eighth research plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research Program since the launch of the

  8. Preliminary Draft EIS

    Energy Savers [EERE]

    In cooperation with the Bureau of Land Management Lane-Wendson No. 1 Transmission Line Rebuild Project Draft Environmental Assessment November 2015 DOE/EA-1952 Lane-Wendson No. 1 Transmission Line Rebuild Project Draft Environmental Assessment Bonneville Power Administration In cooperation with the Bureau of Land Management November 2015 Table of Contents Lane-Wendson No. 1 Transmission Line Rebuild Project Draft Environmental Assessment i Table of Contents Chapter 1. Purpose of and Need for

  9. draft2

    Office of Scientific and Technical Information (OSTI)

    Final Report Department of Energy 1. Grant number: DE-FG02-05ER46247 Recipient: University of Florida 2. Project title: Collective behaviors of the Casimir force in microelectromechanical systems Principle Investigator: John Yelton Department of Physics P. O. Box 118440 Gainesville, FL 32611 Phone: 352-392-8475 Fax: 352-392-8863 yelton@phys.ufl.edu 3. Date of report: 1-3-13 Period covered: 9-1-2008 to 8-31-2012 4. Summary of accomplishments This report describes our progress in the past four

  10. Draft Tiered Rate Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Regional Dialogue Discussion Purposes Only Pre-Decisional Draft Tiered Rates Methodology March 7, 2008 Pre-decisional, Deliberative, For Discussion Purposes Only March 7,...

  11. DOE Issues 82nd Lessons Learned Quarterly Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2nd Lessons Learned Quarterly Report DOE Issues 82nd Lessons Learned Quarterly Report March 3, 2015 - 10:08am Addthis The 82nd Lessons Learned Quarterly Report (LLQR) features recently issued Council on Environmental Quality (CEQ) revised draft guidance on considering greenhouse gas emissions and climate change in NEPA reviews, and a new Executive Order that establishes a federal flood risk management standard to respond to climate change. For more LLQR, click here. Addthis Related Articles 75th

  12. Rulemaking Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rulemaking Guidance Rulemaking Guidance The following rulemaking policies are available: Rulemaking Guidance on DOE Involvement in Consensus Negotiations for energy Conservation...

  13. Geologic setting, petrophysical characteristics, and regional heterogeneity patterns of the Smackover in southwest Alabama. Draft topical report on Subtasks 2 and 3

    SciTech Connect (OSTI)

    Kopaska-Merkel, D.C.; Mann, S.D.; Tew, B.H.

    1992-06-01

    This is the draft topical report on Subtasks 2 and 3 of DOE contract number DE-FG22-89BC14425, entitled ``Establishment of an oil and gas database for increased recovery and characterization of oil and gas carbonate reservoir heterogeneity.`` This volume constitutes the final report on Subtask 3, which had as its primary goal the geological modeling of reservoir heterogeneity in Smackover reservoirs of southwest Alabama. This goal was interpreted to include a thorough analysis of Smackover reservoirs, which was required for an understanding of Smackover reservoir heterogeneity. This report is divided into six sections (including this brief introduction). Section two, entitled ``Geologic setting,`` presents a concise summary of Jurassic paleogeography, structural setting, and stratigraphy in southwest Alabama. This section also includes a brief review of sedimentologic characteristics and stratigraphic framework of the Smackover, and a summary of the diagenetic processes that strongly affected Smackover reservoirs in Alabama. Section three, entitled ``Analytical methods,`` summarizes all nonroutine aspects of the analytical procedures used in this project. The major topics are thin-section description, analysis of commercial porosity and permeability data, capillary-pressure analysis, and field characterization. ``Smackover reservoir characteristics`` are described in section four, which begins with a general summary of the petrographic characteristics of porous and permeable Smackover strata. This is followed by a more-detailed petrophysical description of Smackover reservoirs.

  14. September 8, 2011, HSS/Union Focus Group Work Group Telecom - Work Group Guidance

    Energy Savers [EERE]

    -29-11 Draft Collaboration provides an opportunity to serve as an entity that is greater than the sum of its parts. HSS FOCUS GROUP DRAFT PROPOSED WORK GROUP GUIDANCE BACKGROUND: The HSS Focus Group provides a forum for communication and collaboration related to worker health, safety and security among HSS management and staff, labor unions, DOE Programs and stakeholders. Based on the foundation that labor union representatives are an essential source of frontline perspective in identifying,

  15. Draft Project Execution Plan for the Ion Beam Laboratory at Sandia National

    Energy Savers [EERE]

    Laboratories | Department of Energy Draft Project Execution Plan for the Ion Beam Laboratory at Sandia National Laboratories Draft Project Execution Plan for the Ion Beam Laboratory at Sandia National Laboratories Draft of September 27, 2006 PDF icon IBL.pdf More Documents & Publications DOE Work Breakdown Structure Handbook Sample Project Execution Plan CONCEPTUAL DESIGN REPORT

  16. Recommendations: Draft 2013 Annual Plan | Department of Energy

    Energy Savers [EERE]

    UDAC - Recommendations on Draft 2013 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2013 Section 999 Annual Plan More Documents & Publications UDAC R&D Program Subcommittee Findings and Recommendations Minutes from December 16, 2013 UDAC Meeting UDAC 2014 Report

  17. Lessons Learned Quarterly Report, March 2012 | Department of Energy

    Energy Savers [EERE]

    2 Lessons Learned Quarterly Report, March 2012 This issue features successful practices from recent NEPA reviews and current Council on Environmental Quality initiatives promoting efficient NEPA compliance. Articles in this issue include: Keys to Managing an Expanded NEPA Workload Recent NEPA Reviews Ilustrate Lessons Learned NEPA Order Revision Incorporates Public Review of EAs Bureau of Reclamation Updates NEPA Handbook CEQ Expands NEPA Modernization Activities CEQ Draft Guidance Promotes

  18. Microsoft Word - DRAFT CRB Interview Guidance.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Board may not be familiar with your project(s) and lengthy responses are often confusing. ... Having precise and succinct responses demonstrates expert communication skills, a ...

  19. Revised Draft Guidance for EPAct 2005 Section 242 Program

    Broader source: Energy.gov [DOE]

    In the Energy Policy Act of 2005 (EPAct 2005; Public Law 109-58) Congress established a new program to support the expansion of hydropower energy development at existing dams and impoundments...

  20. POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate FCIP

    Energy Savers [EERE]

    (Expired) | Department of Energy 9 Guidance on Transition to Eliminate FCIP (Expired) POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate FCIP (Expired) THIS GUIDANCE HAS EXPIRED Guidance on the elimination of the Federal Career Intern Program (FCIP) PDF icon POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate FCIP (Expired) Responsible Contacts Ahtora Brooks Human Resource Specialists E-mail Ahtora.Brooks@Hq.Doe.Gov Phone 202-586-1239 More Documents &

  1. Guidance for performing preliminary assessments under CERCLA

    SciTech Connect (OSTI)

    1991-09-01

    EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

  2. THE GUIDANCE I. INTRODUCTION

    Energy Savers [EERE]

    published for public review and comment Dec 2014 1 THE GUIDANCE I. INTRODUCTION The Council on Environmental Quality (CEQ) issues this guidance to provide Federal agencies direction on when and how to consider the effects of greenhouse gas (GHG) emissions 1 and climate change in their evaluation of all proposed Federal actions 2 in accordance with the National Environmental Policy Act (NEPA) and the CEQ Regulations Implementing the Procedural Provisions of NEPA (CEQ Regulations). 3 The guidance

  3. Site Transition Guidance

    Office of Environmental Management (EM)

    Site Transition Guidance March 2010 Office of Environmental Management U.S. Department of Energy Washington D. C. 20585 Standard Review Plan (SRP) Technical Framework for EM...

  4. wind_guidance

    Broader source: Energy.gov [DOE]

    Guidance to Accompany Non-Availability Waiver of the Recovery Act Buy American Provisions for 5kW and 50kW Wind Turbines

  5. LCC Guidance Rates

    Broader source: Energy.gov [DOE]

    Notepad text file provides the LCC guidance rates in a numbered format for the various regions throughout the U.S.

  6. MinorConstructionThresholdGuidance.PDF | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MinorConstructionThresholdGuidance.PDF MinorConstructionThresholdGuidance.PDF PDF icon MinorConstructionThresholdGuidance.PDF More Documents & Publications Audit Report: OAS-M-15-02 CX-008733: Categorical Exclusion Determination Microsoft PowerPoint - 04 Melendez Rimando Restructuring of EM Portfolio Briefing 3 March 2010 rev 2 rcvd 8 Mar 1100 [Compatibi

  7. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan PDF icon Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  8. Biomass 2014 Draft Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biomass 2014 Draft Agenda All topics and times are tentative and subject to change. Page | 1 BIOMASS 2014: Growing the Future Bioeconomy July 29-30, 2014, Washington Convention ...

  9. Draft Environmental Assessment

    Broader source: Energy.gov (indexed) [DOE]

    for the Cliffrose Solar Interconnection Project DOEEA-1989 PrePared By dePartment of energy Western area PoWer administration desert southWest region May 2015 DRAFT ENVIRONMENTAL...

  10. Energy Efficiency and Conservation Block Grant Program Guidance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Energy Efficiency & Conservation Block Grant Program » Energy Efficiency and Conservation Block Grant Program Guidance Energy Efficiency and Conservation Block Grant Program Guidance The Energy Efficiency and Conservation Block Grant (EECBG) Program released guidance documents that explain how the recipients of EECBG funds need to report and manage those funds. These documents are listed below by the year they were released. More program guidance documents are

  11. GC Guidance on Conducting and Participating in Conferences | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy GC Guidance on Conducting and Participating in Conferences GC Guidance on Conducting and Participating in Conferences Guidance and FAQs on DOE Employees Participating in and/or Hosting Conferences PDF icon GC Conference Guidance.pdf PDF icon Conference Co-sponsorship Template.pdf More Documents & Publications Acquisition Letter No. AL 2015-09 POLICY FLASH 2015-36 - AL 2015-09 Inspection Report: IG-0433

  12. EIS-0481: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement EIS-0481: Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic...

  13. Office of Technical Guidance

    Broader source: Energy.gov [DOE]

    The Office of Technical Guidance develops, promulgates, and interprets national level policies, procedures, and guidance to identify (1) information that must be classified or controlled under statute or Executive order to protect the national security, to ensure the effective operation of the Government, or to protect the privacy interests of individuals and (2) classified or controlled information that may be declassified or decontrolled.

  14. Evaluation of enhanced recovery operations in Smackover fields of southwest Alabama. Draft topical report on Subtasks 5 and 6

    SciTech Connect (OSTI)

    Hall, D.R.

    1992-06-01

    This report contains detailed geologic and engineering information on enhanced-recovery techniques used in unitized Smackover fields in Alabama. The report also makes recommendations on the applicability of these enhanced-recovery techniques to fields that are not now undergoing enhanced recovery. Eleven Smackover fields in Alabama have been unitized. Three fields were unitized specifically to allow the drilling of a strategically placed well to recover uncontacted oil. Two fields in Alabama are undergoing waterflood projects. Five fields are undergoing gas-injection programs to increase the ultimate recovery of hydrocarbons. Silas and Choctaw Ridge fields were unitized but no enhanced-recovery operations have been implemented.

  15. URTAC Reports and Recommendations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports and Recommendations URTAC Reports and Recommendations December 18, 2013 Recommendations: Draft Annual Plan Section 999 Annual Plan September 10, 2013 Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan July 8, 2013 2013 Annual Plan Section 999: 2013 Annual Plan November 1, 2012 Recommendations: Draft 2013 Annual Plan URTAC - Recommendations on Draft 2013 Section 999 Annual Plan August 3, 2012 2012 Annual Plan Section 999: 2012 Annual Plan March 8, 2012 Recommendations: Draft 2012

  16. Information and Records Management Transition Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004)...

  17. RH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2006-11-07

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) 71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

  18. RH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2008-01-12

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

  19. Memorandum Guidance for the Preparation of Department of Energy (DOE)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Site Environmental reports (ASERs) for Calendar Year 2014 | Department of Energy Guidance for the Preparation of Department of Energy (DOE) Annual Site Environmental reports (ASERs) for Calendar Year 2014 Memorandum Guidance for the Preparation of Department of Energy (DOE) Annual Site Environmental reports (ASERs) for Calendar Year 2014 This memorandum transmits guidance for the preparation of Department of Energy ASERs for Calendar year 2014 required under DOE O 231.1B,

  20. EA-1906: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  1. Guidance & Opinions | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    DOE Facilities and by DOE Contractors Opinion on Contractor Participation in the Federal Hiring Process Guidance on Inherently Governmental Functions Guidance on Electric Vehicle...

  2. Draft Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda Draft Agenda Draft agenda for the September 20-21, 2007 National Laboratory Fuel Cell Deployment Meeting. PDF icon Draft Agenda More Documents & Publications Fuel Cell Meeting Agenda: Matching Federal Government Needs with Energy Efficient Fuel Cells Water Power Program Peer Review Meeting Agenda Hydrogen, Hydrocarbons, and Bioproduct Precursors from Wastewaters Workshop: Agenda and Objectives

  3. Building America Guidance for Identifying and Overcoming Code, Standard, and Rating Method Barriers

    SciTech Connect (OSTI)

    Cole, P. C.; Halverson, M. A.

    2013-09-01

    This guidance document was prepared using the input from the meeting summarized in the draft CSI Roadmap to provide Building America research teams and partners with specific information and approaches to identifying and overcoming potential barriers to Building America innovations arising in and/or stemming from codes, standards, and rating methods.

  4. Measuring the maturity of a technology : guidance on assigning...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Measuring the maturity of a technology : guidance on assigning a TRL. ... for supplier-customer interactions at a very early stage in technology development. ...

  5. 2006 Draft Rulemaking Activities Data Sheets | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06 Draft Rulemaking Activities Data Sheets 2006 Draft Rulemaking Activities Data Sheets 2006 Appliance Standards Activities Data Sheets - Appliance Standards, Building Technologies Program, U.S. DOE PDF icon 2006_activities_data_sheets.pdf More Documents & Publications Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed - Appendix C Appliance Standard

  6. Guidance for Developing Principal Design Criteria for Advanced (Non-Light Water) Reactors

    SciTech Connect (OSTI)

    Holbrook, Mark; Kinsey, Jim

    2015-03-01

    In July 2013, the US Department of Energy (DOE) and US Nuclear Regulatory Commission (NRC) established a joint initiative to address a key portion of the licensing framework essential to advanced (non-light water) reactor technologies. The initiative addressed the “General Design Criteria for Nuclear Power Plants,” Appendix A to10 Code of Federal Regulations (CFR) 50, which were developed primarily for light water reactors (LWRs), specific to the needs of advanced reactor design and licensing. The need for General Design Criteria (GDC) clarifications in non-LWR applications has been consistently identified as a concern by the industry and varied stakeholders and was acknowledged by the NRC staff in their 2012 Report to Congress1 as an area for enhancement. The initiative to adapt GDC requirements for non-light water advanced reactor applications is being accomplished in two phases. Phase 1, managed by DOE, consisted of reviews, analyses and evaluations resulting in recommendations and deliverables to NRC as input for NRC staff development of regulatory guidance. Idaho National Laboratory (INL) developed this technical report using technical and reactor technology stakeholder inputs coupled with analysis and evaluations provided by a team of knowledgeable DOE national laboratory personnel with input from individual industry licensing consultants. The DOE national laboratory team reviewed six different classes of emerging commercial reactor technologies against 10 CFR 50 Appendix A GDC requirements and proposed guidance for their adapted use in non-LWR applications. The results of the Phase 1 analysis are contained in this report. A set of draft Advanced Reactor Design Criteria (ARDC) has been proposed for consideration by the NRC in the establishment of guidance for use by non-LWR designers and NRC staff. The proposed criteria were developed to preserve the underlying safety bases expressed by the original GDC, and recognizing that advanced reactors may take advantage of various new passive and inherent safety features different from those associated with LWRs.

  7. Selected Guidance & Requirements

    Broader source: Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  8. Federal Guidance Report No. 13

    National Nuclear Security Administration (NNSA)

    QLWHG 6WDWHV LU DQG 5DGLDWLRQ (3 &23;&19;&21;&16;5&16;&28;&28;&16;&19;&19;&20; (QYLURQPHQWDO 3URWHFWLRQ &25;&25;&19;&20;- 6HSWHPEHU&20;&28;&28;&28; JHQF &DQFHU&3;5LVN&3;&RHIILFLHQWV&3;IRU (QYLURQPHQWDO&3;(SRVXUH&3;WR 5DGLRQXFOLGHV ...

  9. Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance Guidance internet-security.jpg Cybersecurity Documents in italics are currently under revision: Cybersecurity Strategy Cybersecurity Architecture OMB Requirements Records Management Employee Separation: Completing HQ F 3293.1, Sec. 7c Centers of Excellence (pdf) DOD 5015.02-STD, Records Management Applications Design Criteria Standards NARA Bulletins Procedures and Instructions Records Management Handbook Web DigitalGov Required Web Content and Links

  10. QA in Design Guidance

    Office of Environmental Management (EM)

    9 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT Guidance Document for Integrating Quality Assurance During the Design and Construction Life Cycle September 2011 Page 2 of 29 FOREWORD This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM. A project's Quality Assurance Program assigns responsibilities and authorities, defines policies and requirements, and provides

  11. NEPA Contracting Reform Guidance

    Energy Savers [EERE]

    CONTRACTING REFORM GUIDANCE U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Assistance December 1996 printed on recycled paper NEPA CONTRACTING REFORM GUIDANCE Overview To reduce the cost and time of the NEPA process, it is critical to do it right the first time. An effective NEPA Contracting Strategy includes: < defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by *

  12. The Status of NRC Decommissioning Guidance on Intentional Soil Mixing

    SciTech Connect (OSTI)

    Watson, B.A.

    2007-07-01

    In 1997, the U.S. Nuclear Regulatory Commission (NRC) published the License Termination Rule (LTR) as Subpart E of 10 CFR Part 20, which established the license termination criteria for unrestricted use and the controls for restricted use. By 2003, the NRC staff's experience with the LTR revealed some important implementation issues impacting the decommissioning of sites, and these were addressed to the Commission (SECY-03-0069). In 2004, the staff provided the Commission with its analysis of a ninth issue, intentional soil mixing (SECY-04-0035). The Commission approved the staff's recommendations, with comments. In the draft revision of Supplement 1 to NUREG-1757, 'Consolidated Decommissioning Guidance', the staff endorsed the current practice of allowing intentional soil mixing to meet the waste acceptance criteria of offsite disposal facilities and the limited use of this practice to demonstrate compliance with the LTR criteria. The staff recommended including a provision that the staff would consider intentional mixing on a case-by-case basis, provided that the resulting contaminated area footprint is not increased and clean soil from outside the footprint is not mixed with contaminated soil to lower the concentrations. In addition, the staff would consider only those rare cases in which the mixing of clean soil is the only viable option for achieving the dose levels of the LTR. In 2005, the staff issued draft Supplement 1 to NUREG-1757 for public comment. The staff evaluated the public comments, including those from a number of States, and revised the guidance. The staff subsequently summarized the public comments on the draft guidance for the Commission (SECY-06-0143) in early 2006. This paper will discuss the public comments related to intentional mixing, the Commission's comments in its staff requirements memorandum, and the revision to the guidance in NUREG-1757 incorporating the current NRC decommissioning policy for intentional soil mixing. (authors)

  13. Characterize and explore potential sites and prepare research and development plan (site investigation study). Final draft. Task 2. Milestone report

    SciTech Connect (OSTI)

    1980-12-01

    A specific research and development plan to investigate the behavior and suitability of aquifers as compressed air energy storage (CAES) sites is presented. The proposed effort will evaluate present uncertainties in the performance of the underground energy storage subsystem and its impact on above ground plant design and cost. The project is planned to provide the utility industry with a quantitative basis for confidence that financial commitment to a demonstration plant and subsequent expansion is justified and poses acceptable risks. Activities in Phase II of a 5-phase overall CAES development program are reported. Information is included on the development of field testing specifications and schedules; selection of specific site for the conceptual design; development plan and schedule for the media site; development of analytical models of aquifer airflow; and well drilling requirements. As a result of these studies 14 sites in Illinois and Indiana were evaluated, 7 were ranked for suitability for CAES, and 4 were selected for possible use in the field testing program. Test procedures, the mathematical models and drilling requirments were developed. (LCL)

  14. Draft of M2 Report on Integration of the Hybrid Hydride Model into INL's MBM Framework for Review

    SciTech Connect (OSTI)

    Tikare, Veena; Weck, Philippe F.; Schultz, Peter A.; Clark, Blythe; Glazoff, Michael; Homer, Eric

    2014-07-01

    This report documents the development, demonstration and validation of a mesoscale, microstructural evolution model for simulation of zirconium hydride {delta}-ZrH{sub 1.5} precipitation in the cladding of used nuclear fuels that may occur during long-term dry storage. While the Zr-based claddings are manufactured free of any hydrogen, they absorb hydrogen during service, in the reactor by a process commonly termed ‘hydrogen pick-up’. The precipitation and growth of zirconium hydrides during dry storage is one of the most likely fuel rod integrity failure mechanisms either by embrittlement or delayed hydride cracking of the cladding. While the phenomenon is well documented and identified as a potential key failure mechanism during long-term dry storage (NUREG/CR-7116), the ability to actually predict the formation of hydrides is poor. The model being documented in this work is a computational capability for the prediction of hydride formation in different claddings of used nuclear fuels. This work supports the Used Fuel Disposition Research and Development Campaign in assessing the structural engineering performance of the cladding during and after long-term dry storage. This document demonstrates a basic hydride precipitation model that is built on a recently developed hybrid Potts-phase field model that combines elements of Potts-Monte Carlo and the phase-field models. The model capabilities are demonstrated along with the incorporation of the starting microstructure, thermodynamics of the Zr-H system and the hydride formation mechanism.

  15. Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.

    SciTech Connect (OSTI)

    Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

    2006-11-01

    The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines for cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off-channel release sites. The BPA, who had been providing funds to the Project since 1982, greatly increased their financial participation for the experimental expansion of the net pen operations in 1993. Instead of just being a funding partner in CEDC operations, the BPA became a major financing source for other hatchery production operations. The BPA has viewed the 10 plus years of funding since then as an explorative project with two phases: a 'research' phase ending in 1993, and a 'development' phase ending in 2006. The next phase is referred to in proposals to BPA for continued funding as an 'establishment' phase to be started in 2007. There are three components of SAFE: (1) The CEDC owns and operates the net pens in the Columbia River estuary on the Oregon side. The CEDC also owns and operates a hatchery on the South Fork Klaskanine River. (2) There are many other hatcheries contributing smolts to the net pen operations. The present suite of hatcheries are operated by the Washington Department of Fish and Wildlife (WDFW) and Oregon Department of Fish and Wildlife (ODFW). The WDFW owns and operates the net pens at Deep River on the Washington side of the Columbia River. (3) The monitoring and evaluation (M&E) responsibilities are performed by employees of WDFW and ODFW. BPA provides funding for all three components as part of NPCC Project No. 199306000. The CEDC and other contributing hatcheries have other sources of funds that also support the SAFE. BPA's minor share (less than 10 percent) of CEDC funding in 1982 grew to about 55 percent in 1993 with the beginning of the development phase of the Project. The balance of the CEDC budget over the years has been from other federal, state, and local government programs. It has also included a 10 percent fee assessment (five percent of ex-vessel value received by harvesters plus five percent of purchase value made by processors) on harvests that take place in off-channel locations near the release sites. The CEDC total annual budget in the last several years has been in the $600 to $700 thousand range. The Project over the years also has relied on heavy volunteer participation and other agency in-kind support. The CEDC budget is exclusive of WDFW and ODFW M&E costs, and all non-CEDC hatchery smolt production costs. The annual estimated operation and management costs for SAFE except for the value of volunteer time and donated materials is in the $2.4 million range. Of this amount, BPA annual funding has been in the $1.6 million or two thirds range in recent years. Depreciation on capital assets (or an equivalent amount for annual contributions to a capital improvement fund) would be in addition to these operation and management costs. North et al. (2006) documented results through the second of three phases and described potential capacities. Full capacity as defined in early planning for the project (TRG 1996) was not reached by the time the second phase ended.

  16. Scientific Guidance, Research, and Educational Outreach for the ARM Climate

    Office of Scientific and Technical Information (OSTI)

    Research Facility (ACRF) in the Southern Great Plains (Technical Report) | SciTech Connect Technical Report: Scientific Guidance, Research, and Educational Outreach for the ARM Climate Research Facility (ACRF) in the Southern Great Plains Citation Details In-Document Search Title: Scientific Guidance, Research, and Educational Outreach for the ARM Climate Research Facility (ACRF) in the Southern Great Plains Scientific Guidance, Research, and Educational Outreach for the ARM Climate Research

  17. UDAC Reports and Recommendations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports and Recommendations UDAC Reports and Recommendations January 27, 2014 UDAC 2014 Report UDAC 2014 Report September 10, 2013 Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan July 8, 2013 2013 Annual Plan Section 999: 2013 Annual Plan November 2, 2012 Recommendations: Draft 2013 Annual Plan UDAC - Recommendations on Draft 2013 Section 999 Annual Plan August 3, 2012 2012 Annual Plan Section 999: 2012 Annual Plan March 8, 2012 Recommendations: Draft 2012 Annual Plan UDAC -

  18. OHA 2013 ANNUAL REPORT DRAFT....

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... four sessions of the pilot class "Difficult Conversations" were held for the Chief Financial Officer managers in February and March 2013. P "Interagency Dispute Resolution Skills ...

  19. Director's Discretionary Research and Development Program, Annual Report FY 2007

    Broader source: Energy.gov [DOE]

    Director's Discretionary Research and Development Program, Annual Report FY 2007 May 2007 Final Draft.

  20. Draft Environmental Assessment for NorthStar | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Draft Environmental Assessment for NorthStar ENVIRONMENTAL ASSESSMENT FOR NORTHSTAR MEDICAL TECHNOLOGIES LLC COMMERCIAL DOMESTIC PRODUCTION OF THE MEDICAL ISOTOPE MOLYBDENUM-99 Proposed Action: The Department of Energy (DOE) National Nuclear Security Administration (NNSA) proposes to provide funding to NorthStar to accelerate the establishment of the commercial production of the medical isotope molybdenum-99 using accelerator technology. Report Designation: Draft Environmental

  1. ARM - Social Media Guidance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CenterSocial Media Guidance Media Contact Hanna Goss hanna-dot-goss-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes110 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 6 ARM Mobile Facility 2 47 ARM Mobile Facility 3 1 BAECC 1 BBOP 4 ENA 1 GOAMAZON 7 HI-SCALE 3 MAGIC 15 MC3E 17 PECAN 3 SGP 7 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features and Releases Facility News Field Notes

  2. Section 106 Archaeology Guidance

    Broader source: Energy.gov [DOE]

    The Advisory Council on Historic Preservation's Section 106 guidance is designed to assist federal agencies in making effective management decisions about archaeological resources in completing the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). This guidance highlights the decision-making role of the federal agency in the Section 106 process. It is also designed for use by State and Tribal Historic Preservation Officers, Indian tribes, Native Hawaiian organizations, and cultural resource management professionals when assisting federal agencies to meet their responsibilities under Section 106.

  3. Property:Draft(m) | Open Energy Information

    Open Energy Info (EERE)

    Draft(m) Jump to: navigation, search Property Name Draft(m) Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:Draft(m)&oldid623735" Feedback...

  4. Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2009 Guidance on Energy Efficiency Enforcement Regulations Notice of 2009 Guidance on Energy Efficiency Enforcement Regulations Notice - DOE Guidance on Energy Efficiency Enforcement Regulations, Federal Register Vol. 74, No. 197 October 14, 2009. This notice sets forth the Department of Energy's (DOE's) interpretation of its energy efficiency enforcement regulations. These regulations provide for manufacturer submission of compliance statements and certification reports

  5. EIS-0386: Draft Programmatic Environmental Impact Statement ...

    Office of Environmental Management (EM)

    Draft Programmatic Environmental Impact Statement EIS-0386: Draft Programmatic Environmental Impact ... would continue under current agency procedures for granting rights-of-way. ...

  6. EIS-0403: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM...

  7. Draft HAB Advice on Integrated Safety Management ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Committee Draft Advice -Integrated Safety Management v.3 - Korenko, Smith Page 13 Draft ... Safety Management v.3 - Korenko, Smith Page 23 employees, and actively listening ...

  8. EIS-0310: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, ...

  9. EIS-0396: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear ...

  10. EIS-0515: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Supplemental Draft Environmental Impact Statement EIS-0515: Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, ...

  11. EIS-0472: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0472: Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, ...

  12. Attachment 2: Draft Settlement Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    made by the Parties in all prior discussions, negotiations and agreements, whether oral or written, relating to the subject matter of this Agreement. 11. DRAFTING OF THE...

  13. General Privacy Act Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act Guidance General Privacy Act Guidance This document provides information on Privacy Act Requests and responses to general FAQs PDF icon General Privacy Act Guidance ...

  14. Guidance for Radiation Accident Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies

  15. Environmental guidance regulatory bulletin

    SciTech Connect (OSTI)

    1997-01-31

    This document describes the background on expanding public participation in the Resource Conservation and Recovery Act and DOE`s response. The bulletin also describes the changes made by the final rule to existing regulations, guidance provided by EPA in the preamble and in the revised RCRA Public Participation Manual, the relationship between public participation and environmental justice, and DOE`s recent public participation and environmental justice initiatives.

  16. ESPC ENABLE Draft Task Order

    Broader source: Energy.gov [DOE]

    Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project.

  17. Draft Request for Proposal Documents | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Draft Request for Proposal Documents Instructions for DRAFT SNL Solicitation DE-SOL-0008470 Documents DRAFT Section B DE-SOL-0008470 DRAFT Section L DE-SOL-0008470 Instructions DRAFT Section M DE-SOL-0008470 Evaluation Factors DRAFT DE-SOL-0008470 Appendix A SNL Statement of Work DRAFT Section L Attachment E - Past Performance Information Form DRAFT Section L Attachment F - Past Performance Questionnaire DRAFT Section L Attachment G - Management Team Cost Sheet

  18. EIS-0288: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor

  19. Draft Innovative Exploration Technologies Needs Assessment

    Broader source: Energy.gov [DOE]

    A draft needs assessment for the Geothermal Technologies Programs Innovative Exploration Technologies Subprogram.

  20. EIS-0222: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

  1. Biomass 2014 Draft Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Draft Agenda Biomass 2014 Draft Agenda The following document is a draft agenda for the Biomass 2014: Growing the Future Bioeconomy conference. PDF icon Biomass 2014 Draft Agenda More Documents & Publications Bioproducts to Enable Biofuels Workshop Agenda Bioenergy 2015 Agenda 2015 Project Peer Review Program Booklet

  2. Technical Standards, CFAST-Code Guidance - July 23, 2004 | Department of

    Energy Savers [EERE]

    Energy CFAST-Code Guidance - July 23, 2004 Technical Standards, CFAST-Code Guidance - July 23, 2004 July 23, 2004 EPIcode Computer Code Application Guidance for Documented Safety Analysis The contents of this report are applicable in the interim period until measures are completed to bring EPIcode into compliance with defined SQA standards. The primary objective of the guidance report is to provide information on the use of EPIcode for supporting DOE safety basis accident analysis. PDF icon

  3. Appliance Standards Guidance and Frequently Asked Questions

    Office of Environmental Management (EM)

    Implementation, Certification, & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR Building Energy Codes Appliance Standards Guidance and Frequently Asked...

  4. Energy Sector Cybersecurity Framework Implementation Guidance

    Broader source: Energy.gov (indexed) [DOE]

    FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of Contents...

  5. EA-1904: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the ...

  6. EA-1902: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Assessment EA-1902: Draft Environmental Assessment Northern Wind Project, Roberts County, South Dakota DOE's Western Area Power Administration issued a draft ...

  7. EA-1979: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1979: Draft Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a draft EA that ...

  8. EA-1891: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft EA to ...

  9. EA-1984: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1984: Draft Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory, Idaho DOE has prepared a draft EA to...

  10. EA-1966: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1966: Draft Environmental Assessment Sunflower Wind Project, Hebron, North Dakota Western Area Power Administration issued a Draft EA that...

  11. EIS-0370: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental ...

  12. EIS-0325: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft...

  13. Microsoft Word - GJPPGPracticesDraft.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GJPPGPracticesDraft.doc Microsoft Word - GJPPGPracticesDraft.doc PDF icon Microsoft Word - GJPPGPracticesDraft.doc More Documents & Publications 1 DOE Purchase Card Policy Natural ...

  14. EIS-0387: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft ... More Documents & Publications EIS-0391: EPA Notice of Availability of the Draft ...

  15. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  16. EIS-0499: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0499: Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Draft EIS to evaluate the ...

  17. EIS-0463: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0463: Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire DOE issued a Draft EIS that evaluates the ...

  18. EIS-0333: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    333: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental Impact ...

  19. EIS-0503: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0503: Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE prepared this Draft EIS to evaluate the ...

  20. Guidance Systems Division ,

    Office of Legacy Management (LM)

    Oockec No. 10-0772 22 OCT 1981 Bcndlx CorporaLion ' Guidance Systems Division , ATTN: Mr. Wf 11 la,,, Hnrr,,or Manngar, PlanL Englne0rtny Teterboro, New Jersey 07608 uwm STATES NUCLEAll I-IEOULATOIJY COMMISSION REGION i 631 PARK A"LH"I KIN0 OF PR"ISIA. PCNNIVLVANIA ID40' Gentlemen: Subject: Inspectfon 81-15 _ "-- .,; .z .;; Thts refers to the closeout safety \nspectlon conducted by Ms. M. Campbell of this office on August 27, 1961, of activities formerly authorized by NRC

  1. Environmental Justice: Guidance Under NEPA

    Broader source: Energy.gov [DOE]

    Guidance from the Council on Environmental Quality to assist Federal agencies with their NEPA procedures so that environmental justice concerns are effectively identified and addressed.

  2. EECBG Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency And Conservation Block Grant Grantees On Financing Programs EECBG Program Notice 09-002B - Guidance for Energy Efficiency and Conservation Block Grant Grantees on ...

  3. Final Draft *** Final Draft *** Final Draft Hanford Advisory Board 2013 Program of Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft *** Final Draft *** Final Draft Hanford Advisory Board 2013 Program of Work 9/6/12 Page 1 of 15 Topic Relevant Document or Decision Policy Level Issue Action 1 Committee Assignment Timing Comments Cross Cutting Site wide permit Permit TBD Tracking RAP, TWC, PIC, HSEP Post-release of the permit. Review agency response to advice and respond accordingly; Review response to public comment; Want to see follow up on issues HAB raised in advice. LTS - Closure plans and transition of segments to

  4. NNSA Supplemental Guidance: NA-1 SD G 1027

    Broader source: Energy.gov [DOE]

    Guidance on using Release Fraction and Modern Dosimetric information consistently with DOE STD 1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, Change Notice No. 1.

  5. Hanford Advisory Board Draft Letter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Letter Topic: Worker safety and communication restrictions Authors: Bob Suyama, Shelley Cimon, Susan Leckband, Jerry Peltier Originating Committee: Executive Issues Committee Version #1 10.14.15 Draft letter: worker safety and communication restrictions v.1 Since the inception of the Hanford Advisory Board (Board), one of the Board's primary values is the protection of worker health and safety at the Hanford Site. The Board continues to be concerned about the consequences of worker

  6. EA-1974: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1974: Draft Environmental Assessment Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Bonneville Power Administration ...

  7. EIS-0491: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0491: Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  8. Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...

    Office of Environmental Management (EM)

    Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation PDF icon Draft Advanced Nuclear Solicitation...

  9. Prototype Programmatic Agreement Guidance

    Broader source: Energy.gov [DOE]

    Prototype programmatic agreements are a type of program alternative that the Advisory Council on Historic Preservation (ACHP) can designate to assist federal agencies in their efforts to comply with the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). Prototype agreements may be used for the same type of program or undertaking in more than one case or area, and typically establish efficiencies and protocols for implementing these undertakings. This ACHP guidance describes the process for developing prototype agreements, the involvement of interested parties, and other important components to be considered when exploring the use of a prototype agreement as a program alternative.

  10. Draft Environmental Assessment Sleeping Giant Hydropower Project

    Energy Savers [EERE]

    Draft Environmental Assessment Sleeping Giant Hydropower Project Montana Area Office Great Plains Region October 2015 Draft Environmental Assessment Sleeping Giant Hydropower Project Table of Contents (Page 1 of 3) CHAPTER 1 - INTRODUCTION .................................................................................................................... 1 PROPOSED ACTION

  11. EIS-0523: Draft Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States

  12. National Environmenal Policy Act Contracting Reform Guidance: Phase 1

    SciTech Connect (OSTI)

    1995-08-01

    The NEPA Contracting Quality Improvement Team identified several contracting improvements to reduce the cost and time for the NEPA process. The team`s February 1995 report recommended a series of steps to achieve the improvements, including issuance of contracting guidance. The guidance will be issued in three phases. This Phase I guidance implements the team`s short-term recommendations. It provides model statements of work and a sample schedule of contractor deliverables, establishes a pilot program for evaluating performance of NEPA support contractors, and describes information resources available on the DOE NEPA Web.

  13. All NEPA Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance » All NEPA Guidance All NEPA Guidance Council on Environmental Quality Guidance Final Guidance on Improving the Process for Preparing Efficient and Timely Environmental Reviews Under the National Environmental Policy Act (2012) Appropriate Use of Mitigation and Monitoring and Clarifying the Appropriate Use of Mitigated Findings of No Significant Impact (2011) Guidance for Federal Departments and Agencies on Establishing, Applying, and Revising Categorical Exclusions under NEPA (2010)

  14. Energy Intensity Baselining and Tracking Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance Better Plants Energy Intensity Baselining and Tracking Guidance Energy Intensity Baselining and Tracking Guidance The Energy Intensity Baselining and ...

  15. Interim Guidance Regarding Limitations on CERCLA Liability |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Inner-Office Memorandum: Interim Guidance Regarding Limitations on CERCLA LiabilityPermitting...

  16. Security and Cyber Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security and Cyber Guidance Security and Cyber Guidance Appraisal Process Guides Security Evaluations Appraisal Process Guide - April 2008 Cyber Security Evaluations Appraisal ...

  17. High Performance and Sustainable Buildings Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Additional Federal guidance on the sustainability aspects of Executive Order 13423 can ... Technical Guidance on requirements and strategies for meeting the Guiding Principles is ...

  18. High Performance and Sustainable Buildings Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance PDF icon High Performance and Sustainable Buildings Guidance More Documents & ... EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance

  19. Guidance on Incorporating EPA's Pollution Prevention Strategy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Review Process (EPA, 1993) Guidance on Incorporating EPA's Pollution Prevention Strategy into the Environmental Review Process (EPA, 1993) The guidance discusses ...

  20. Amended Environmental Impact Statement Filing System Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact ...

  1. Utah Antidegradation Review Implementation Guidance | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Utah Antidegradation Review Implementation GuidancePermittingRegulatory...

  2. Additional Guidance Regarding Application of Current Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

  3. Renewable Energy Financial Instruments Guidance Tool (REFINe...

    Open Energy Info (EERE)

    Guidance Tool (REFINe) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Financial Instruments Guidance Tool (REFINe) Focus Area: Renewable Energy...

  4. Departmental Personnel Security - Implementation Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation Guidance Overview of Security ClearanceAccess Authorization Process for Applicants Drug Testing Implementation Guidance December 3, 2007 Template for Contractor ...

  5. Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers

    Broader source: Energy.gov [DOE]

    This report is a guidance document prepared for the benefit of commercial nuclear power plants’ (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile...

  6. Office of Personnel Management (OPM) Guidance on Diversity and Inclusion |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Personnel Management (OPM) Guidance on Diversity and Inclusion Office of Personnel Management (OPM) Guidance on Diversity and Inclusion The following documents are from the Office of Personnel Management (OMP)'s Office of Diversity and Inclusion, which is responsible for reviewing and evaluating plans, reports, and programs for conformance with various laws, regulations, and directives relating to diversity and inclusion. Governement-Wide Diversity and

  7. Energy Efficiency and Conservation Block Grant Financing Program Guidance |

    Energy Savers [EERE]

    Grantee Letter | Department of Energy Guidance Grantee Letter Energy Efficiency and Conservation Block Grant Financing Program Guidance Grantee Letter This document clarifies the U.S. Department of Energy's ongoing role in the monitoring, reporting, and oversight of Energy Efficiency and Conservation Block Grant-funded financing programs, including Revolving Loan Funds, Loan Loss Reserves, and Interest Rate Buydowns. PDF icon July 2014 Letter to EECGB Financing Program Managers More

  8. Project Management Policy & Guidance Documents

    Broader source: Energy.gov [DOE]

    Project Management Policy & Guidance documents from Department of Energy, other Government organization and adopted industry best practices fro managing design and construction of capital assets from Initiation through Closeout.

  9. Implemenation Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Earned Value Management » Implemenation Guidance Implemenation Guidance Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical (scope) accomplishments on a project or task. Following established implementation guidelines and conducting periodic surveillance of implemented EVM System (EVMS) will ensure that both the government and contractors have the ability to examine detailed schedule information, critical program

  10. Technical Standards, Guidance on MACCS2 Computer Code - June 30, 2004 |

    Office of Environmental Management (EM)

    Energy EPIcode Computer Code Application Guidance for Documented Safety Analysis The contents of this report are applicable in the interim period until measures are completed to bring EPIcode into compliance with defined SQA standards. The primary objective of the guidance report is to provide information on the use of EPIcode for supporting DOE safety basis accident analysis. PDF icon Technical Standards, CFAST-Code Guidance More Documents & Publications Technical Standards,

  11. Water Power Forum - Q & A | OpenEI Community

    Open Energy Info (EERE)

    Breakdown Structure Draft MHK LCOE Reporting Guidance Draft Worldwide 'Power exchanges' Hi Vanessa-I connected wit... 2013 projects and funding more Group members (24) Managers:...

  12. Water Power Forum | OpenEI Community

    Open Energy Info (EERE)

    Breakdown Structure Draft MHK LCOE Reporting Guidance Draft Worldwide 'Power exchanges' Hi Vanessa-I connected wit... 2013 projects and funding more Group members (24) Managers:...

  13. Worldwide 'Power exchanges' | OpenEI Community

    Open Energy Info (EERE)

    Breakdown Structure Draft MHK LCOE Reporting Guidance Draft Worldwide 'Power exchanges' Hi Vanessa-I connected wit... 2013 projects and funding more Group members (24) Managers:...

  14. CMI Guidance Documents | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CMI Guidance Documents This page has links to pdf versions of CMI Guidance Documents for CMI staff: Publication process flow chart Acknowledgement text Foreign travel Press releases IP protection The Microsoft Word versions of these, and additional guidance documents, are available in the data storage server. Tags: guidance document

  15. Recommendations: Draft 2007 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    Draft 2007 Section 999 Annual Plan Recommendations: Draft 2007 Section 999 Annual Plan PDF icon UDAC - Recommendations on Draft 2007 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2012 Annual Plan UDAC Meeting - July 2007 Recommendations: Draft 2008 Section 999

  16. Recommendations: Draft 2010 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    10 Section 999 Annual Plan Recommendations: Draft 2010 Section 999 Annual Plan PDF icon UDAC - Recommendations on Draft 2010 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2009 Section 999 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: Draft 2013

  17. Stable a-Si:H Based Multijunction Solar Cells with Guidance from Real Time Optics: Annual Report, Phase I: 17 July 1998-16 October 1999

    SciTech Connect (OSTI)

    Wronski, C.R.; Collins, R.W.; Jiao, L.; Ferlauto, A.; Rovira, P.I.; Koval, R.J.; Lu, Z.; Niu, X.

    2000-08-29

    This summary describes tasks of novel improved intrinsic materials for multijunction solar cells, insights into improved stability in materials and solar cells, optimization of solar cell performance with improved intrinsic layers, and optimization of multijunction solar cells. The report characterizes a protocrystalline a-Si:H film growth regime where thin samples retain their amorphous state when their growth time or thickness is limited to small values, even when films are deposited with high hydrogen dilution that results in microcrystalline thick films. The Staebler-Wronski degradation kinetics of films and devices are systematically studied as a function of hydrogen dilution.

  18. Draft Sample Collection Instrument

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    reporting processes for recipients of DOE financial assistance and prime contractors use. ... to enter the Davis-Bacon data at the same time and into the same reporting interface as ...

  19. Stable a-Si:H-Based Multijunction Solar Cells with Guidance from Real-Time Optics: Final Report, 17 July 1998--16 November 2001

    SciTech Connect (OSTI)

    Wronski, C. R.; Collins, R. W.; Pearce, J. M.; Koval, R. J.; Ferlauto, A. S.; Ferreira, G. M.; Chen C.

    2002-08-01

    This report describes the new insights obtained into the growth of hydrogenated silicon (Si:H) films via real-time spectroscopic ellipsometry (RTSE) measurements. Evolutionary phase diagrams were expanded to include the effects of different deposition conditions, including rf power, pressure, and temperature. Detailed studies of degradation kinetics in thin films and corresponding solar cells have been carried out. Both p-i-n and n-i-p solar cells that incorporate Si:H i-layers deposited with and without H2-dilution have been studied. For the first time, direct and reliable correlations have been obtained between the light-induced changes in thin-film materials and the degradation of the corresponding solar cells.

  20. Information architecture. Volume 3: Guidance

    SciTech Connect (OSTI)

    1997-04-01

    The purpose of this document, as presented in Volume 1, The Foundations, is to assist the Department of Energy (DOE) in developing and promulgating information architecture guidance. This guidance is aimed at increasing the development of information architecture as a Departmentwide management best practice. This document describes departmental information architecture principles and minimum design characteristics for systems and infrastructures within the DOE Information Architecture Conceptual Model, and establishes a Departmentwide standards-based architecture program. The publication of this document fulfills the commitment to address guiding principles, promote standard architectural practices, and provide technical guidance. This document guides the transition from the baseline or defacto Departmental architecture through approved information management program plans and budgets to the future vision architecture. This document also represents another major step toward establishing a well-organized, logical foundation for the DOE information architecture.

  1. Guidance on GENII computer code - July 6, 2004 | Department of Energy

    Office of Environmental Management (EM)

    June 2015 Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports ii Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports TABLE OF CONTENTS 1.0 BACKGROUND ................................................................................................................ 1 1.1 Public Information Source ...............................................................................................2 1.2 Coordination and

  2. Recommendations: Draft 2011 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    1 Section 999 Annual Plan Recommendations: Draft 2011 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2011 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2012 Annual Plan UDAC Next Steps UDAC Meeting - February 2011

  3. OFFICIAL USE ONLY Pre-Decisional Draft OFFICIAL USE ONLY Pre-Decisional Draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OFFICIAL USE ONLY Pre-Decisional Draft OFFICIAL USE ONLY Pre-Decisional Draft SAFEGUARDS & SECURITY STRATEGY Safeguards & Security requirements are derived from the quantity and attractiveness of the material, as shown in Figures1 and 2. Figure 1 Nuclear Material Safeguards Categories OFFICIAL USE ONLY Pre-Decisional Draft OFFICIAL USE ONLY Pre-Decisional Draft Description/Form MaximumSNM concentration* (wt%) for MC&A and physical protection termination MaximumSNM concentration(wt%)

  4. WAP Memorandum 014: Feedback on Draft Multifamily and Rental WPNs |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy WAP Memorandum 014: Feedback on Draft Multifamily and Rental WPNs WAP Memorandum 014: Feedback on Draft Multifamily and Rental WPNs Effective: Nov. 23, 2015 This memo serves as an opportunity for WAP Grantees to review and provide comment on two draft Weatherization Program Notices (WPNs) developed by the U.S. Department of Energy (DOE). PDF icon WAP Memorandum 014: Feedback on Draft Multifamily and Rental WPNs PDF icon Draft Multifamily WPN PDF icon Draft Rental Unit

  5. EA-1880: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1880: Draft Environmental Assessment Big Bend to Witten Transmission Line Project, South Dakota The USDA Rural Utilities Service, initially the ...

  6. EA-1993: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas The proposed action ...

  7. EA-1972: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  8. EA-1934: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1934: Draft Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA will evaluate the potential ...

  9. EA-1976D: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6D: Draft Environmental Assessment EA-1976D: Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida DOE's National Energy Technology Laboratory ...

  10. EA-1901: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA ...

  11. EA-1973: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1973: Draft Environmental Assessment Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Bonneville Power Administration issued ...

  12. EA-1995: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1995: Draft Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  13. EA-1931: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power ...

  14. National Electric Transmission Congestion Study - Draft for Public...

    Office of Environmental Management (EM)

    - Draft for Public Comment August 2014 National Electric Transmission Congestion Study - Draft for Public Comment August 2014 On August 19, 2014, the Department issued a Federal...

  15. EA-1941: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1941: Draft Environmental Assessment Boyer-Tillamook Access Road Improvement Project, Tillamook and Yamhill Counties, Oregon BPA has prepared a ...

  16. EIS-0395: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio...

  17. EA-1855: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission...

  18. EIS-0317-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Supplemental Environmental Impact Statement EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  19. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County, Colorado...

  20. EA-1932: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

  1. EIS-0312: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

  2. EIS-0414: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC ...

  3. EA-1989: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Draft Environmental Assessment EA-1989: Draft Environmental Assessment Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona Western Area Power Administration...

  4. New Draft of Cybersecurity Risk Management Process (RMP) Guideline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now ...

  5. The Department of Energy Releases Draft of Cybersecurity Risk...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) The Department of Energy Releases Draft of ...

  6. EA-1860: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 92...

  7. EA-1728: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington For more information, contact: Mr....

  8. EA-1960: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  9. EA-1889: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the...

  10. EA-1829: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA...

  11. EIS-0143: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & ...

  12. EIS-0450: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being ...

  13. EA-1809: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN This EA evaluates the potential...

  14. Department of Energy Issues Draft Renewable Energy and Efficient...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy ...

  15. EA-1952: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1952: Draft Environmental Assessment Lane-Wendson No. 1 ... EA-1952: Final Environmental Assessment EA-1952: Finding of No Significant Impact

  16. EA-1922: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a ... EA-1922: Draft Environmental Assessment EA-1922: Finding of No Significant Impact

  17. EA-1903: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1903: Draft Environmental Assessment Kansas State ... EA-1903: Final Environmental Assessment EA-1903: Finding of No Significant Impact

  18. EIS-0377: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental...

  19. EIS-0404: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0404: EPA Notice of Availability of the Draft Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California...

  20. EIS-0492: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0492: EPA Notice of Availability of Draft Environmental Impact Statement Oregon LNG Export Project ...

  1. Panel 2, Renewable Energy & Energy Efficiency Projects: Draft...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30 years: Vogtle LPO Has Financed Deployment of Groundbreaking Projects 4 Draft Renewable Energy & Efficient Energy Projects Solicitation 5 Draft Solicitation Can Provide ...

  2. EA-1917: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for the...

  3. EA-1862: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9...

  4. HAWAI'I CLEAN ENERGY DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT...

    Broader source: Energy.gov (indexed) [DOE]

    HAWAI'I CLEAN ENERGY DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT SUMMARY (DOEEIS-0459) APRIL 2014 COVER SHEET TITLE: Hawai'i Clean Energy Draft Programmatic Environmental...

  5. ASHRAE draft regarding Smart Grid RFI: Addressing Policy and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ASHRAE draft regarding Smart Grid RFI: Addressing Policy and Logistical Challenges ASHRAE draft regarding Smart Grid RFI: Addressing Policy and Logistical Challenges The American ...

  6. Progress Energy draft regarding Smart Grid RFI: Addressing Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Energy draft regarding Smart Grid RFI: Addressing Policy and Logistical Challenges Progress Energy draft regarding Smart Grid RFI: Addressing Policy and Logistical ...

  7. EIS-0413: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the...

  8. EIS-0483: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0483: Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  9. EIS-0499: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: EPA Notice of Availability of Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Draft ...

  10. EA-1923: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  11. Department of Energy Issues Draft Loan Guarantee Solicitation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects September ...

  12. Draft Chapter 4: Transmission Adequacy | Department of Energy

    Energy Savers [EERE]

    Draft Chapter 4: Transmission Adequacy Draft Chapter 4: Transmission Adequacy A robust interstate electric transmission network must be developed to enable our electricity future....

  13. EIS-0440: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy ...

  14. EIS-0408: EPA Notice of Availability of a Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Upper ...

  15. EIS-0442: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, ...

  16. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line ...

  17. EIS-0284: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System ...

  18. EIS-0431: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's ...

  19. EIS-0472: EPA Notice of Availability of a Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement ...

  20. EIS-0463: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line ...

  1. EIS-0515: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0515: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement Bay Delta ...

  2. EIS-0469: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement Wilton IV Wind Energy Center; ...

  3. EIS-0503: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0503: EPA Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link ...

  4. EIS-0481: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered ...

  5. EIS-0445: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia Notice of Availability of Draft...

  6. EA-1945: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1945: Draft Environmental Assessment Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft...

  7. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77: Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County,...

  8. EIS-0319: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts...

  9. EIS-0503: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0503: DOE Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link ...

  10. Public Invited to Comment on Draft Environmental Assessment for...

    Energy Savers [EERE]

    Public Invited to Comment on Draft Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental ...

  11. UNEP Handbook for Drafting Laws on Energy Efficiency and Renewable...

    Open Energy Info (EERE)

    Handbook for Drafting Laws on Energy Efficiency and Renewable Energy Resources Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNEP Handbook for Drafting Laws on Energy...

  12. EA-1790: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc, MS The U.S. Department of Energy (DOE) has prepared a draft Environmental...

  13. EIS-0439: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

  14. EIS-0343: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0343: Draft Environmental Impact Statement COB Energy Facility COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation...

  15. EIS-0438: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY This EIS ...

  16. EA-1955: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1955: Draft Environmental Assessment Campbell County Wind Farm, Campbell County, South Dakota DOE's Western Area Power Administration (Western) ...

  17. EIS-0323: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Draft Environmental Impact Statement Sacramento Area Voltage Support This Draft EIS evaluates the potential environmental effects of physical...

  18. Federal Register Notice for Draft Addendum to Environmental Review...

    Energy Savers [EERE]

    Notice for Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States Federal Register Notice for Draft Addendum to...

  19. EA-1947: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1947: Draft Environmental Assessment Transfer of the Kansas City Plant, Kansas City, Missouri The National Nuclear Security Administration (NNSA)...

  20. EIS-0441: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    a Draft Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona EPA announces the availability of BLM's Draft Environmental Impact Statement for the...

  1. EA-1870: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    70: Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this...

  2. EIS-0485: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0485: Draft Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  3. EIS-0505: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement ...

  4. EIS-0501: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0501: EPA Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; ...

  5. EIS-0498: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0498: Draft Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy ...

  6. EIS-0493: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0493: Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a ...

  7. EIS-0501: Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of Draft Environmental Impact Statement EIS-0501: Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and ...

  8. EIS-0496: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San Luis Transmission Project; Alameda, Merced, San Joaquin, and Stanislaus Counties, California ...

  9. Draft Environmental Impact Statement Available for Public Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, ...

  10. DOE Extends Public Comment Period for the Draft Uranium Leasing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Draft Uranium Leasing Program Programmatic Environmental Impact Statement DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental ...

  11. EIS-0279: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  12. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revision to EPA Notice Of Availability Draft Environmental Impact Statement EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact Statement Northern Pass ...

  13. EIS-0501: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0501: Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission ...

  14. EIS-0376: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  15. EIS-0525: Department of Commerce Notice of Availability of Draft...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0525: Department of Commerce Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0525: Department of Commerce Notice of Availability of Draft ...

  16. EIS-0523: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0523: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Nationwide ...

  17. EIS-0306: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0493: Notice of Availability of the Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of the Draft Environmental Impact Statement EIS-0493: Notice of Availability of the Draft Environmental Impact Statement The Federal Energy Regulatory Commission ...

  19. EIS-0284: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Draft Environmental Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits ...

  20. EIS-0082-S2: Draft Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    82-S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  1. EIS-0480: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0480: Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam The Bureau of ...

  2. EIS-0271: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  3. EIS-0525: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0525: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Nationwide ...

  4. EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  5. Draft Needs Assessment for Innovative Exploration Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    advances for the subprogram to pursue. Input received will be used to guide the strategy for leveraging resources to advance geothermal exploration tools. The Draft...

  6. Buildings Interoperability Landscape - Draft | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE is therefore sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems. As part of that effort, this draft ...

  7. EIS-0377: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power...

  8. EIS-0250: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  9. Draft Advanced Fossil Solicitation | Department of Energy

    Office of Environmental Management (EM)

    Draft.1 More Documents & Publications Federal Loan Guarantees for Projects that Manufacture Commercial Technology Renewable Energy Systems and Components: August 10, 2010...

  10. FY 2014 Real Property Data Related to Operations and Maintenance Guidance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance PDF icon FY_2014_Data_Related_to_Operations_and_Maintenance_Memorandum.pdf More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY 2012 Real Property Deferred, Actual, and

  11. Interim report of the interagency coal export task force: draft for public comment. [Trade by country 1960-1979; general forecasting to 1985, 1990 and 2000

    SciTech Connect (OSTI)

    1981-01-01

    The Interagency Coal Export Task Force was formed in the Spring of 1980 at the direction of the President, in support of the international efforts of the United States, encouraging the use of coal. Its purpose was to report on possible courses of action to increase United States steam coal exports in a manner consistent with other national policies, including our commitment to environmental protection. The Task Force assembled existing data, developed significant new information regarding the international coal market and undertook analyses of apparent problems underlying coal exports. The Task Force contributed to a public awareness of the fact that increased coal exports will serve both the domestic and international interests of the United States. Based upon extensive, independent field studies in Europe and the Far East, the Task Force concludes that there will be significant growth in world demand for steam coal. Such growth has already begun, has contributed to the almost seven-fold increase in United States overseas steam coal exports for 1990 over 1979, and is expected to continue beyond the end of this century. The growth in world steam coal trade projected in the report does not guarantee United States coal exporters a large or expanding share of the market. The United States' role depends on the buying strategies of the consuming countries, the policies and prices of competing exporters, and the actions taken by the United States to maintain reasonable prices, prompt delivery and dependable quality. Projections of United States steam coal exports, therefore, rest upon a number of highly uncertain factors which are discussed in some detail.

  12. An in-cylinder study of the particulate/NO{sub x} trade-off in a DI Diesel Engine. Draft of final report

    SciTech Connect (OSTI)

    Litzinger, T.A.; Santavicca, D.A.; Santoro, R.J.

    1994-07-01

    The goal of the work performed during the contract period was to establish the ability to study soot and NO within the combustion chamber of a DI Diesel engine and to couple these measurements with actual exhaust emissions. This work was motivated by the need to obtain a more complete understanding of the particulate/NO{sub X} trade-off, observed in Diesel engines, to aid engine designers in meeting emissions limits. In order to achieve the desired goal, an optically accessible DI Diesel engine was designed and constructed. Also, planar imaging methods for imaging soot and NO were developed in laboratory flames and were then applied to the engine. For the study of soot, planar Mie scattering was used and a polarization ratio method was investigated to distinguish soot from fuel droplets. The Mie scattering technique proved to be well suited for the engine, and extensive results were obtained. In order to observe NO, planar laser induced fluorescence was used and it was successfully applied in the engine. In addition to these techniques, high speed combustion photography and shadowgraph photography were applied to obtain general characteristics of the combustion process. As a final diagnostic, actual engine emissions were measured. This report begins with a brief discussion of the problem under investigation and a summary of other studies of the NO{sub x}/particulate trade-off. Following these sections is a summary of the accomplishments and results from the present study. Finally, detailed results are presented through the six technical papers which were written during the contract period; these papers are appended to the report.

  13. [Draft minutes of IAPG Mechanical Working Group meeting

    SciTech Connect (OSTI)

    Skinner, D.M.

    1993-12-15

    This report provides the draft minutes of the Interagency Advanced Power Group meeting held November 3--4, 1993. Topics addressed are: Materials for thermal management; photovoltaic programs in the Airforce; ground based radar advanced power system development program; battery research; generator prognostics & diagnostics equipment; a thermal flight experiment test program; power systems assessment; Overview: Phillip`s space thermal technologies branch; and development of actuator thermal management.

  14. Contractor report to the Department of Energy on opportunities for integration of environmental management activities across the complex (predecisional draft). Revision 1

    SciTech Connect (OSTI)

    1997-03-01

    The US Department of Energy (DOE) Environmental Management (EM) program faces significant technical and financial challenges in cleaning up the environmental legacy of nuclear weapons production and research and development, while facing an uncertain future in obtaining the needed funding to perform this work. Many of these requirements, including State and Federal regulations and negotiated agreements, continue to be a significant contributor to EM program costs and schedules. Historically, the sites have managed their programs focusing on their individual site`s needs. While this approach maximized successes at individual sites, it has resulted in a more costly program than if more integration across the DOE system occurred. In July 1996, the DOE Assistant Secretary for EM, Al Alm, chartered a contractor led effort to perform complex-wide integration in support of the ten-year plan process to develop a suite of technically defensible, integrated alternatives to meet the EM mission. This report documents opportunities for waste and nuclear materials management integration activities in six areas: transuranic (TRU) waste, mixed low-level waste (MLLW), low-level waste (LLW), environmental restoration (ER), high-level waste (HLW), and spent nuclear fuel (SNF). The opportunities represent technically defensible solutions which reduce cost, accelerate schedules, and result in no significant increase in risk.

  15. SGIG Reporting Guidance Archive | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    public comment on request to the Office of Management and Budget (OMB) to extend for three years the emergency Information Collection Request Title: OE Recovery Act Financial ...

  16. Security Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters facilities in the National Capital Area under normal and abnormal (i.e., ... Headquarters facilities in the National Capital Area under normal and abnormal (i.e., ...

  17. Environment Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    improvement and shape behavior in environmental protection before incidents occur. ... line organizations in the resolution of environmental issues and management concerns. ...

  18. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-02-28

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.

  19. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2003-04-30

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the WIPP management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  20. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-04

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT Shipping Package, and directly related components. This document complies with the minimum requirements as specified in TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event there is a conflict between this document and the SARP or C of C, the SARP and/or C of C shall govern. C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SAR P charges the WIPP Management and Operation (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize these operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  1. Privacy Impact Assessment Template and Guidance

    Broader source: Energy.gov [DOE]

    Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting an...

  2. Multiyear Program Plan Template - Phase II Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multiyear Program Plan Template - Phase II Guidance Multiyear Program Plan Template - Phase II Guidance EERE template and guidance for program managers to develop multiyear plans, ...

  3. DOE Indian Energy Purchase Preference Policy Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Indian Energy Purchase Preference Policy Guidance DOE Indian Energy Purchase Preference Policy Guidance PDF icon PDFFINAL DOE Indian Energy purchase preference policy guidance.pdf ...

  4. February2GuidanceMemorandum.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February2GuidanceMemorandum.pdf February2GuidanceMemorandum.pdf PDF icon February2GuidanceMemorandum.pdf More Documents & Publications Memorandum of Understanding (MOU) POLICY...

  5. OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf PDF icon OfficeGovernmentEthicsGuidanceEthicsandProc...

  6. Privacy Impact Assessment (PIA) Template and Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Impact Assessment (PIA) Template and Guidance Privacy Impact Assessment (PIA) Template and Guidance File PrivacyImpactAssessmentTemplateMay2009wGuidance.docx More ...

  7. Renewable Energy Requirement Guidance for EPAct 2005 and Executive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Requirement Guidance for EPAct 2005 and Executive Order 13423 Renewable Energy Requirement Guidance for EPAct 2005 and Executive Order 13423 Guidance specifies ...

  8. Federal Building Energy Use Benchmarking Guidance, August 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Use Benchmarking Guidance, August 2014 Update Federal Building Energy Use Benchmarking Guidance, August 2014 Update Guidance describes the Energy Independence and Security ...

  9. Technical Standards, Guidance on MELCOR computer code - May 3...

    Office of Environmental Management (EM)

    Standards, Guidance on MELCOR computer code - May 3, 2004 Technical Standards, Guidance on MELCOR computer code - May 3, 2004 May 3, 2004 MELCOR Computer Code Application Guidance...

  10. Idaho Section 401 Certification Guidance | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Idaho Section 401 Certification GuidancePermittingRegulatory GuidanceGuide...

  11. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2006-04-25

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package TransporterModel II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant| (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations(CFR) 71.8. Any time a user suspects or has indications that the conditions ofapproval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted.

  12. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2009-06-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  13. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2008-09-11

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  14. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2007-12-13

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted.

  15. Tech Rpt draft

    Office of Scientific and Technical Information (OSTI)

    Narrative Report Project summary abstract Applicant: Western Michigan University Project Principal Investigators: The principal investigator is Dr. David A. Barnes, and Dr. William B. Harrison is Co-Principal Investigator. Both are researchers at the Michigan Geological Repository for Research and Education (MGRRE), part of the Department of Geosciences, Western Michigan University, Kalamazoo, Michigan. Project Title: Establishing MICHCARB, a geological carbon sequestration research and

  16. Buy American Program Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buy American Program Guidance Buy American Program Guidance Provides information on the December 17, 2009, Buy American Guidance PDF icon eere_program_guidance_buy_american_121709.pdf More Documents & Publications Projects Funded by the American Recovery and Reinvestment Act of 2009 and Administered by the Office of Energy Efficiency and Renewable Energy (EERE) Notice (Expired) Nationwide Limited Public Interest Waiver for LED Lighting and HVAC Units: February 11, 2010 Questions and Answers

  17. Guidance Regarding NEPA Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document provides Council on Environmental Quality guidance on several topics: scoping, categorical exclusions, adoption procedures, contracting provisions, selection of ...

  18. Guidance & Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements Guidance & Requirements The Office of NEPA Policy and Compliance provides guidance and requirement documents to the NEPA community to ensure that the Department's proposed actions comply with the letter and spirit of the National Environmental Policy Act, and to assist the interested public in reviewing NEPA documents. Guidance Guidance documents from the Council on Environmental Quality, Department of Energy, Environmental Protection Agency, and other federal agencies

  19. Guidance for Developing and Implementing Institutional Controls |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Guidance for Developing and Implementing Institutional Controls Guidance for Developing and Implementing Institutional Controls This guidance document is to help U.S. Department of Energy (DOE) Office of Legacy Management (LM) personnel understand what is necessary and acceptable for implementing the provisions of DOE Policy 454.1, Use of Institutional Controls, for long-term surveillance and maintenance (LTS&M) at LM sites. PDF icon Guidance for Developing and

  20. Internal Controls Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Internal Controls Guidance Internal Controls Guidance Guidance required to be implemented by Departmental elements to meet the requirements of the Federal Managers' Financial Integrity Act (FMFIA), as described in Office of Management and Budget (OMB) Circular A-123, Management's Responsibility for Internal Control. This guidance provides instructions for conducting internal controls evaluations and help ensure the Secretary's annual Statement of Assurance is accurate and adequately supported.

  1. WPN 06-1: 2006 Grant Guidance

    Office of Energy Efficiency and Renewable Energy (EERE)

    To issue grant guidance and management information for the Low-Income Weatherization Assistance Program (Weatherization) for Program Year 2006.

  2. NEPA Contracting Reform Guidance | Department of Energy

    Energy Savers [EERE]

    Contracting Reform Guidance NEPA Contracting Reform Guidance This documents provides guidance on NEPA contracting strategy, including: defining the work of the contractor; establishing contracts ahead of time; minimizing cost while maintaining quality. Guidance also provides: model statements of work, direction on NEPA contract management by NEPA Document Manager; a system for measuring NEPA costs and for evaluating contractor procedures; details on the DOE NEPA website. PDF icon NEPA

  3. State Energy Program 2015 Formula Grant Guidance

    Broader source: Energy.gov [DOE]

    The document below is effective February 27, 2015 and offers State Energy Program Formula Grant Guidance for Program Year 2015.

  4. State Energy Program 2016 Formula Grant Guidance

    Broader source: Energy.gov [DOE]

    The document below is effective Feb. 26, 2016, and offers State Energy Program Formula Grant Guidance for Program Year 2016.

  5. Remedial design/remedial action strategy report

    SciTech Connect (OSTI)

    Dieffenbacher, R.G.

    1994-06-30

    This draft Regulatory Compliance Strategy (RCS) report will aid the ER program in developing and implementing Remedial Design/Remedial Action (RD/RA) projects. The intent of the RCS is to provide guidance for the implementation of project management requirements and to allow the implementation of a flexible, graded approach to design requirements depending on the complexity, magnitude, schedule, risk, and cost for any project. The RCS provides a functional management-level guidance document for the identification, classification, and implementation of the managerial and regulatory aspects of an ER project. The RCS has been written from the perspective of the ER Design Manager and provides guidance for the overall management of design processes and elements. The RCS does not address the project engineering or specification level of detail. Topics such as project initiation, funding, or construction are presented only in the context in which these items are important as sources of information or necessary process elements that relate to the design project phases.

  6. POLICY GUIDANCE MEMORANDUM #03 Addressing Missclassified Positions |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3 Addressing Missclassified Positions POLICY GUIDANCE MEMORANDUM #03 Addressing Missclassified Positions This memorandum provides policy guidance on how to consistently address misclassified positions within the Department and is effective immediately. There are several different circumstances that affect how a misclassified position will be addressed. PDF icon POLICY GUIDANCE MEMORANDUM #3A Addressing Missclassified Positions Responsible Contacts Jennifer Ackerman

  7. DRAFT 20 August 2008

    Office of Environmental Management (EM)

    09 Approved on September 24, 2008 NORTHERN NEW MEXICO CITIZENS' ADVISORY BOARD (NNMCAB) Recommendation to the Department of Energy No. 2008-09 Regarding DOE/LANL Funding Priorities Environmental Monitoring, Remediation and Surveillance Committee Background The Northern New Mexico Citizen's Advisory Board (NNMCAB) has consistently recommended as one of its "Top Three Issues" reported to Environmental Management (EM) Headquarters 1 the full funding of Los Alamos National Laboratory's

  8. DRAFT July 21 , 2008

    Office of Environmental Management (EM)

    Security Clearance Vetting at the Portsmouth Site OAI-L-16-07 February 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 February 19, 2016 MEMORANDUM FOR THE MANAGER OF PORTSMOUTH/PADUCAH PROJECT OFFICE FROM: April G. Stephenson Assistant Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Inspection Report on "Security Clearance Vetting at the Portsmouth Site"

  9. Draft Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energys Building Technologies Office (BTO) has released its draft Multi-Year Program Plan (MYPP) for public comment. The draft MYPP provides a broad overview of buildings energy use and efficiency opportunities, and the strategies and goals of BTO to substantially accelerate the rate of efficiency improvements in both new and existing residential and commercial buildings.

  10. FTCP Assessment Guidance and Criteria

    Broader source: Energy.gov [DOE]

    This document establishes the guidance and criteria for conducting internal and independent Federal Technical Capability Assessments within the Department. The requirements of this document are applicable to those organizations having safety responsibilities for defense nuclear facilities. This includes both headquarters and field organizations. Regardless of the type of assessment conducted, the objectives and criteria within this document are used as a basis for the assessment. Use of consistent objectives and criteria is necessary to establish baselines and to track and trend performance.

  11. HFE Process Guidance and Standards for potential application to updating NRC guidance

    SciTech Connect (OSTI)

    Jacques Hugo; J. J. Persensky

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

  12. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management High Energy Physics (HEP) HEP Home About Research Facilities Science Highlights Benefits of HEP Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts HEP Early Career Opportunities Review Policy / Proposal Guidelines / Reporting Requirements Additional Requirements and Guidance for Digital Data Management

  13. Microsoft Word - Cadmus_BBEE_Pilot_Evaluation_Final_Report_08APR2013...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... 16 Behavior Based Energy Efficiency Pilot Evaluation Draft Report April 8, 2013 vi Review of Measurement and...

  14. EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  15. Recommendations: Draft 2009 Section 999 Annual Plan | Department of Energy

    Energy Savers [EERE]

    09 Section 999 Annual Plan Recommendations: Draft 2009 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2009 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2010 Section 999 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: 2009

  16. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Energy Savers [EERE]

    2 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: Draft Section 999 2012 Annual Plan PDF icon Section 999 - Recommendations: Draft 2012 Annual Plan More Documents & Publications URTAC Meeting - December 18, 2013 Recommendations: 2010 Annual Plan Recommendations: Draft Annual Plan

  17. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 Annual Plan Recommendations: Draft 2012 Annual Plan UDAC - Recommendations on Draft 2012 Section 999 Annual Plan PDF icon UDAC Recommendations on Draft 2012 Section 999 Annual Plan More Documents & Publications Recommendations: Draft 2011 Section 999 Annual Plan Minutes from December 16, 2013 UDAC Meeting UDAC Next Steps

  18. Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation |

    Energy Savers [EERE]

    Draft Advanced Fossil Solicitation Draft Advanced Fossil Solicitation Federal loan guarantee solicitation announcement -- Advanced Fossil Energy Projects. PDF icon Microsoft Word - Draft Advanced Fossil Solicitation Final Draft.1 More Documents & Publications Federal Loan Guarantees for Projects that Manufacture Commercial Technology Renewable Energy Systems and Components: August 10, 2010 Advanced-Fossil-Energy-Projects-Loan-Guarantee-Solicitation_COMPLETE_22-Apr-2015 Nuclear Power

  19. Comment Listing Response to Draft REEE Solicitation FINAL | Department of

    Energy Savers [EERE]

    Energy Comment Listing Response to Draft REEE Solicitation FINAL Comment Listing Response to Draft REEE Solicitation FINAL PDF icon Comment ListingResponse_REEE Solicitation_final.pdf More Documents & Publications Draft Advanced Fossil Energy Projects Solicitation Public Comments Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation DOE-LPO_Email-Update_001_Through_11

  20. EA-2006: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Columbia Estuary Ecosystem Restoration Program Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, issued a draft programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence through breaching dikes and levees; partial reconnection of tidal influence through culverts, bridges, and tidegates; enhancement of the quantity and quality of tidal channels; removal of invasive species; and restoration of riparian habitat conditions, such as planting native vegetation.

  1. DRAFT/PRELIMINARY MEETING AGENDA

    Office of Environmental Management (EM)

    DRAFT AGENDA U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP NEW ORLEANS, LOUISIANA JANUARY 29-30, 2002 Judith Holm, TEC Co-Chair, DOE-NTP Monday, January 28, 2002 4:00 - 6:00 p.m. Consolidated Grant Topic Group Meeting Judith Holm, DOE-National Transportation Program Tuesday, January 29, 2002 8:00 - 8:30 a.m. Continental Breakfast and General Registration Sue Martindale, Mary McConnell, SAIC 8:30 -12:00 p.m. Topic Group Meetings - Training and Medical Issues - Ella

  2. Draft FY 2012 Agency Financial Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... performance goals, assessment methodologies, metrics, ... corn stalk harvested by local farmers located within a ... DOE plays a central role in sustaining a safe, ...

  3. Draft FY 2012 Agency Financial Report

    Energy Savers [EERE]

    ... Based on internal evaluations, I can provide reasonable ... by droughts and extreme heat waves, more wildfires than ... abundant in agricultural waste, including grasses, farm ...

  4. Acid rain information book. Draft final report

    SciTech Connect (OSTI)

    1980-12-01

    Acid rain is one of the most widely publicized environmental issues of the day. The potential consequences of increasingly widespread acid rain demand that this phenomenon be carefully evaluated. Reveiw of the literature shows a rapidly growing body of knowledge, but also reveals major gaps in understanding that need to be narrowed. This document discusses major aspects of the acid rain phenomenon, points out areas of uncertainty, and summarizes current and projected research by responsible government agencies and other concerned organizations.

  5. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Office of Environmental Management (EM)

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  6. EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...

    Energy Savers [EERE]

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  7. POLICY GUIDANCE MEMORANDUM #01 Documenting Hires Funded by ARRA (Expired)

    Broader source: Energy.gov [DOE]

    THIS GUIDANCE HAS EXPIRED Guidance on Documenting Hires funded by American Recovery and Reinvestment Act of 2009

  8. BTO Seeks Comments on Draft Building Energy Modeling Roadmap | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy BTO Seeks Comments on Draft Building Energy Modeling Roadmap BTO Seeks Comments on Draft Building Energy Modeling Roadmap The Department of Energy's Building Technologies Office (BTO) seeks input from stakeholders on a draft Building Energy Modeling Roadmap. The draft Roadmap provides background and context, then outlines steps that BTO's contractor recommends to help increase the use of BEM tools for the design and operation of energy-efficient buildings. The draft Roadmap is

  9. EIS-0396: DOE Notice of Availability of the Draft Programmatic

    Energy Savers [EERE]

    Environmental Impact Statement | Department of Energy DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0396: DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The Department of Energy (DOE) announces the availability of the Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (Draft GNEP PEIS, DOE/EIS-0396). PDF icon Notice of Availability of Draft Global

  10. EIS-0463: EPA Notice of Availability of Draft Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire EPA announced the availability of the Draft Environmental Impact Statement (Draft EIS) for the Northern Pass Transmission Line Project. The Draft EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Northern Pass

  11. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  12. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect (OSTI)

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  13. Draft Guidance for the Implementation and Follow-up of Identified...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... OMB will assess agency progress on their SustainabilityEnergy Scorecard during the ... Elements ComplianceProgressPerformance Metrics Benchmark Metered Buildings that are, or ...

  14. CEQ Issues Revised Draft NEPA Guidance on GHG Emissions and Climate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... significance remains subject to agency practice for the consideration of context and ... and mitigations, and ensure the professional and scientific integrity of the ...

  15. Draft Site-Wide Environmental Impact Statement Nevada Summary Draft |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Summary Draft Attachment Size BLM 2010.pdf 47.6 KB BN 1999.pdf 15.21 MB DOE 1997Summary.pdf 14.44 MB DOE 1997 Volume 1.pdf 14.59 MB DOE 1997 Volume 2.pdf 29 MB DOE 1997 Volume 3.pdf 30.37 MB DOE 1997 Volume 4.pdf 23.71 MB DOE 1997 Volume 5.pdf 9.62 MB DOE 2002.pdf 11.31 MB DOE 2008a.zip 137.99 MB DOE 2008b.pdf 4.73 MB DOE 2010a.pdf 30.7 KB DOE 2010b.zip 75.86 MB DOE NV 1998a.pdf 11.64 MB DOE NV 1998b.pdf 6.9 MB DOE NV 2009.pdf 40.88 MB DOL 2010a.pdf

  16. Better Buildings Neighborhood Program Reporting and Information System

    Broader source: Energy.gov [DOE]

    This page includes the latest guidance, resources, and links to assist partners with reporting. Information includes:

  17. O:\IM-20\E-Government Program Office\FDMS\FDMS database\DOE\2012\Document List 03-02-2012 10-10-11-600\Document List 03-02-2012 10-10-11-600_docs\Robin Hindel_ Comment -DRAFT-0003.html

    Energy Savers [EERE]

    Robin%20Hindel_%20Comment%20-DRAFT-0003.html[2/3/2012 12:39:35 PM] PUBLIC SUBMISSION As of: February 03, 2012 Received: January 11, 2012 Status: Pending_Post Tracking No. 80f93029 Comments Due: January 20, 2012 Submission Type: Web Docket: DOE-HQ-2012-0004 U.S. Department of Energy Audit Guidance: For-Profit Recipients Comment On: DOE-HQ-2012-0004-0001 Audit Guidance: For-Profit Recipients Document: DOE-HQ-2012-0004-DRAFT-0003 Comment on FR Doc # 2011-32622 Submitter Information Name: Robin

  18. Reporting Resources for SEP and EECBG Grant Recipients | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy State Energy Program » Program Guidance » Reporting Resources for SEP and EECBG Grant Recipients Reporting Resources for SEP and EECBG Grant Recipients On June 23, 2011, the SEP and EECBG programs released new reporting guidance. The new guidance, letters summarizing the reporting changes, as well as FAQs are available below. Please contact your DOE Project Officer with any questions. EECBG Reporting Guidance: Program Notice 10-07C effective June 23, 2011 SEP Reporting Guidance:

  19. DOE O XXX.X DRAFT XX-XX-XX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE O XXX.X DRAFT XX-XX-XX 4 DOE O XXX.X DRAFT XX-XX-XX DOE O XXX.X 3 DRAFT XX-XX-XX DOE O XXX.X Appendix A DRAFT XX-XX-XX A- 1 (and A-2) DOE O XXX.X Attachment 1 DRAFT XX-XX-XX Page 1 (and Page 2) Appendix E DOE O 251.1C E- 6 1-15-09 DOE O XXX.X Attachment 2 DRAFT XX-XX-XX Page 1 (and Page 2) draftDOE O XXX.XdraftDOE O XXX.Xu.s. Department of EnergyORDER draft DOE O XXX.X draft DOE O XXX.X Washington, DC Approved: XX-XX-XXXX SUBJECT: title PURPOSE. (Define the program or subject matter and its

  20. Bureau of Land Management - Examples of Scoping Reports | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Supplemental Material: Bureau of Land Management - Examples of Scoping ReportsPermittingRegulatory GuidanceSupplemental Material...

  1. Commissioning Guidance for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. PDF icon Download the Commissioning Guidance. More Documents & Publications FEMP Comprehensive ESPC Workshop Presentations Investment-Grade Audit Kickoff Meeting Sample

  2. SORN Template and Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SORN Template and Guidance SORN Template and Guidance Privacy Act System of Records Notice (PDF) System of Record Notice template with guidance in a Microsoft Word format. Microsoft Office document icon SORN-Template_June_2009(1).doc More Documents & Publications Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - FOIAXpress

  3. POLICY GUIDANCE MEMORANDUM #26 Official Worksite Determinations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6 Official Worksite Determinations POLICY GUIDANCE MEMORANDUM #26 Official Worksite Determinations The following information is provided to assist in determinations of official worksites for remote workers. This guidance applies to Federal employees and employees hired under the Intergovernmental Personnel Act (IPA). PDF icon POLICY GUIDANCE MEMORANDUM #26 Official Worksite Determinations Responsible Contacts Ahtora Brooks Human Resource Specialists E-mail

  4. Site Transition Guidance | Department of Energy

    Energy Savers [EERE]

    Guidance Site Transition Guidance On June 16, 2004, Michael W. Owen, Director, Office of Legacy Management (LM) and Jessie H. Roberson, Assistant Secretary, Office of Environmental Management (EM) co-signed a memorandum titled "Transition of Sites from Environmental Management." The memorandum described EM's and LM's expectations on site transition process and requirements. PDF icon Site Transition Guidance More Documents & Publications EM Recovery Act Lessons Learned (Johnson)

  5. Adverse Diversity Analysis Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adverse Diversity Analysis Guidance Adverse Diversity Analysis Guidance PDF icon Attachment 8 - Adverse Diversity Analysis Guidance PDF icon Attachment 8(a) - WFR disparate impact chart example completed PDF icon Attachment 8(b) - WFR disparate impact chart clean More Documents & Publications Fact #922: April 25, 2016 Share of Older Population Holding Driver's Licenses is Up and Share of Younger Population Holding Driver's Licenses is Down - Dataset FAIR Act Inventory - FY13 Fayette Country,

  6. Enforcement Guidance Supplements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplements Enforcement Guidance Supplements To better support and describe implementation of the Department of Energy's nuclear safety enforcement program, over the years the Office of Enforcement has developed guidance (in the form of Enforcement Guidance Supplements (EGSs)) to address emerging situations or specific questions relating to enforcement of DOE's nuclear safety requirements. Where appropriate, information contained in the EGSs has been incorporated into the body of the Office of

  7. Energy Sector Cybersecurity Framework Implementation Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Cybersecurity Framework Implementation Guidance Energy Sector Cybersecurity Framework Implementation Guidance On January 8, 2015, the Energy Department released guidance to help the energy sector establish or align existing cybersecurity risk management programs to meet the objectives of the Cybersecurity Framework released by the National Institutes of Standards and Technology (NIST) in February 2014. The voluntary Cybersecurity Framework consists of standards, guidelines, and

  8. Draft LM 2016–2025 Strategic Plan

    Broader source: Energy.gov [DOE]

    We invite you to read the Draft Office of Legacy Management (LM) 2016-2025 Strategic Plan, now posted for public comment. This will be our fourth strategic plan since the office was established in...

  9. EIS-0451: Supplemental Draft Environmental Impact Statement ...

    Broader source: Energy.gov (indexed) [DOE]

    option (3A) that BPA identified when considering comments on the March 2013 Hooper Springs Transmission Project Draft EIS. EIS-0451-SDEIS-Vol1-2014.pdf EIS-0451-SDEIS-Vol2-2014...

  10. Microsoft Word - CLWR Draft SEIS Comment

    National Nuclear Security Administration (NNSA)

    Draft Suppl emen tal Envi ron mental I mpa ct Statemen t for the Production of Tritium in a Commercial Light Water Reactor U.S. Department of Energy National Nuclear Security ...

  11. DRAFT

    Office of Environmental Management (EM)

    5 Approved May 14, 2009 1 2 3 4 5 6 7 8 9 10 NORTHERN NEW MEXICO CITIZENS' ADVISORY BOARD Recommendation to the Department of Energy 2009-05 Recommendation for 2011 Priorities for...

  12. DRAFT

    Office of Environmental Management (EM)

    4 Approved May 14, 2009 1 2 3 4 5 6 7 8 9 10 11 12 NORTHERN NEW MEXICO CITIZEN'S ADVISORY BOARD Recommendation to the Department of Energy No. 2009-04 Priorities for ARRA Stimulus...

  13. Draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to be major and with significant impacts, an environmental impact statement will be prepared. ... Department of Energy Implementing Procedures for the National Environmental ...

  14. Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... stand to benefit from a systematic, institutional approach ... Jim Thomas of the Hanford Education Action League commented ... years of inattention to changing standards and demands ...

  15. draft

    Energy Savers [EERE]

    3 (08-93) U.S. Department of Energy ORDER FOR SUPPLIES OR SERVICES ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES IMPORTANT: Mark all packages and papers with contract and/or order numbers. 1. DATE OF ORDER 2. CONTRACT NO. (if any) 3. ORDER NO. 4. REQUISITION/REFERENCE NO. 5. ISSUING OFFICE (Address correspondence to) BUYER NO. CODE 6. SHIP TO: (Consignee and address, ZIP Code) SHIP VIA: 7. TO CONTRACTOR (Name, address and ZIP Code) 8. TYPE OF ORDER 9 9 A. PURCHASE - Reference

  16. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commitment and Partnership Essential for Future Nuclear Workforce By Susan Winsor, Ph.D. After a very long period of inactivity, our region and nation are experiencing a welcome resurgence in nuclear power as utilities make plans to meet future electricity needs. In the next several years, construction will be complete on four new nuclear generating units not far from us in South Carolina and Georgia. The Department of Energy's Savannah River Site, our region's largest employer, also plans to

  17. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SRS Will Continue to Lead in Nuclear Technology By David Moody, Ph.D. As we celebrate National Nuclear Science Week, it is timely to reflect on the contributions the Savannah River Site has made to the region and the Nation over more than a half century and to look to its future as a continued leader in nuclear technology. SRS was created at a critical time in our Nation's history. The Cold War had chilled relations between the world's Superpowers. Détente was fragile. Tensions were high. The

  18. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Opportunities Abound in Nuclear Technology By Anne Rice From technologists to engineers, radiologists to doctors of nuclear medicine, there are many exciting and challenging fields associated with careers in nuclear science. As we observe National Nuclear Science Week, local educators - working with the SRS Community Reuse Organization (SRSCRO) - are underscoring to their students the multitude of nuclear-related job opportunities that loom on the horizon in our region over the next decade. From

  19. DRAFT

    National Nuclear Security Administration (NNSA)

    ... of a linear accelerator (linac) and chemical processing facility (the NorthStar ... Using the funding provided by NNSA, NorthStar proposes to construct a linac and chemical ...

  20. DRAFT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    .3 (January 2012) 1 Compliance with U.S. Export Control Laws, Regulations and Policies References a. Federal Acquisition Regulations (FAR) 17.6, Management and Operating Contracts b. Department of Energy Acquisition Regulations (DEAR) 917.6, Management and Operating Contracts c. Atomic Energy Act of 1954 (AEA), as amended, http://www.nrc.gov/reading-rm/doc- collections/nuregs/staff/sr0980/v1/sr0980v1.pdf#page=13 (accessed 9/27/11) d. "Contractor Compliance with Deemed Export Controls,"