Powered by Deep Web Technologies
Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Conceptual Design Plan SM-43 Replacement Project  

SciTech Connect

The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

University of California, Los Alamos National Laboratory, SCC Project Office

2000-11-01T23:59:59.000Z

2

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

3

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

4

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

5

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

6

Downhole replaceable drill bit: progress report and program plan  

DOE Green Energy (OSTI)

The significant progress in the development of the downhole replaceable drill bit which had been completed by the end of January 1976 is reviewed. A long-range program plan is included to indicate the level of effort required to bring this system to commercial production.

Newsom, M.M.; St. Clair, J.A.; Ashmore, R.F.; Dodd, H.M. Jr.

1976-06-01T23:59:59.000Z

7

Fossil-Fuel CO2 Emissions from Centrally Planned Asia  

NLE Websites -- All DOE Office Websites (Extended Search)

Centrally Planned Asia map Trends Centrally Planned Asia (CPA) includes Vietnam, North Korea (officially Democratic People's Republic of Korea), and Mongolia, but regional...

8

Waste analysis plan for central waste complex  

SciTech Connect

This waste analysis plan (WAP) has been prepared for the Central Waste Complex which is located in the 200 West Area of the Hanford Facility, Richland, Washington. This WAP documents the methods used to characterize, and obtain and analyze representative samples of waste managed at this unit.

Weston, N.L.

1996-09-20T23:59:59.000Z

9

Project Plan: Central and Eastern United States Seismic Source Characterization for Nuclear Facilities  

Science Conference Proceedings (OSTI)

This project plan outlines the Central and Eastern United States Seismic Source Characterization for Nuclear Facilities (CEUS SSC) Project, which will replace the Seismic Hazard Methodology for the Central and Eastern United States, EPRI report NP-4726, July 1986. The objective of the CEUS SSC project is to develop an up-to-date assessment of probabilistic seismic hazard analysis (PSHA) SSC for CEUS. Input to a PSHA consists of both seismic source and ground motion characterization. These two components ...

2008-06-16T23:59:59.000Z

10

Work plan, AP-102 mixer pump removal and pump replacement  

DOE Green Energy (OSTI)

The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ``green house`` will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken.

Jimenez, R.F.

1994-09-01T23:59:59.000Z

11

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects  

Science Conference Proceedings (OSTI)

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

Richman, Eric E.

2009-11-04T23:59:59.000Z

12

COMPREHENSIVE CLOSURE PLAN FOR THE HANFORD CENTRAL PLATEAU  

Science Conference Proceedings (OSTI)

This paper describes a comprehensive and strategic plan that has been recently developed for the environmental closure of the Central Plateau area of the Hanford Site, a former weapons-production complex managed by the U.S. Department of Energy (DOE). This approach was submitted to the DOE Richland Operations Office by Fluor Hanford to provide a framework and roadmap to integrate ongoing operations with closure of facilities that are no longer actively used--all with a view to closing the Central Plateau by 2035. The plan is currently under consideration by the DOE.

LACKEY, M.B.

2005-05-31T23:59:59.000Z

13

COMPREHENSIVE EVERGLADES RESTORATION PLAN CENTRAL AND SOUTHERN FLORIDA PROJECT  

E-Print Network (OSTI)

with project goals and objectives, is estimated to have a total project first cost of $168,023,000 (amount does not include sunk Project Implementation Report costs), and annual costs associated with vegetation managementCOMPREHENSIVE EVERGLADES RESTORATION PLAN CENTRAL AND SOUTHERN FLORIDA PROJECT BISCAYNE BAY COASTAL

US Army Corps of Engineers

14

Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(03-94) Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN OMB Control No. 1910-0400 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project (1910-0400), Washington, DC 20503.

15

EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010  

Energy.gov (U.S. Department of Energy (DOE))

Project plan for the development of a centralized quality assurance training platform to develop a consistent approach and methodology to training personnel.

16

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

17

Plant Support Engineering: Guidance for Planned Replacement of Large Power Transformers at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Utilities continue to pursue license renewal applications and power uprates, and these initiatives are being undertaken on an aging fleet of nuclear plants. Many plants are facing the necessity of replacing large power transformers to support these initiatives. However, industry expertise to support such activities has diminished since the days of plant construction8212there are fewer qualified vendors and equipment manufacturers, materials and standards might have changed, and licensees are typically no...

2007-11-02T23:59:59.000Z

18

north central texas water quality Through the Water Quality Education and Planning for  

E-Print Network (OSTI)

north central texas water quality Through the Water Quality Education and Planning for North Central Texas project, the Texas Water Resources Institute and Texas AgriLife Extension Service are collabo- rating with Tarrant Regional Water District (TRWD), Texas A&M Spatial Sciences Laboratory

Wilkins, Neal

19

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

20

What gets better results? Markets or central planning? The case of Ontario  

SciTech Connect

Ontario has evolved into a hybrid state with new regulatory oversight, a central planning agency, and a wholesale market operator; politically, there is no appetite for markets since the province abandoned competition and privatization in 2002. The structure is briefly described and charted. The current plan calls for the province's reliance on renewable resources to increase by 90 percent over the next 20 years. This mandate is not costless and carries some risks.

NONE

2008-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project Plan 7930 Cell G PaR Remote Handling System Replacement  

Science Conference Proceedings (OSTI)

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

Kinney, Kathryn A [ORNL

2009-10-01T23:59:59.000Z

22

Impact evaluation of an induction furnace replacement under the Energy $avings Plan at Mackenzie Specialty Castings, Incorporated  

SciTech Connect

This impact evaluation of an induction furnace replacement that was recently installed at Mackenzie Specialty Castings, Incorporated (Mackenzie Castings) was conducted for the Bonneville Power Administration (Bonneville) as part of an evaluation of its Energy Savings Plan (ESP) Program. The project consists of replacing old power supplies and induction furnace with new, more efficient supplies and equipment. The objective of this impact evaluation was to assess how much electrical energy is being saved at Mackenzie Castings as a result of the ESP and to determine how much the savings cost Bonneville and the region. The impact of the project was evaluated with a combination of engineering analysis, financial analysis, interviews, and submittal reviews (Mackenzie Castings`s proposal and completion report). Based on this impact evaluation, energy savings from this project are expected to be 425,257 kWh/yr at minimum annual production, 647,037 kWh/yr at typical annual production, and 1,294,074 kWh/yr at maximum annual production, or 0.05, 0.07, and 0.15 average megawatts, respectively. On a per-ton basis, this project will save 608 kWh/ton or 31% at minimum production and 431 kWh/ton or 39% at typical and maximum production. The project cost $277,110 to install, and Mackenzie Castings received payment of $102,551 (in 1993 dollars) from Bonneville for acquisition of the energy savings. The real levelized cost of these energy savings to Bonneville is 22.9 mills/kWh at minimum production, 15.1 mills/kWh typical production, and 7.5 mills/kWh at maximum production (in 1993 dollars) over the project`s assumed 15-year life. The real levelized cost to the region is 59.1 mills/kWh at minimum production, 38.8 mills/kWh at typical production, and 19.4 mills/kWh at maximum production in 1993 dollars, not including transmission and distribution effects.

Oens, M.A.; Spanner, G.E.

1994-04-01T23:59:59.000Z

23

Solar Central Receiver Prototype Heliostat. Volume II. Phase II planning (preliminary)  

DOE Green Energy (OSTI)

A currently planned DOE program will develop and construct a 10 MW/sub e/ Pilot Plant to demonstrate the feasibility and operational characteristics of Solar Central Receiver Power Generation. The field of heliostats is a major element of the Solar Central Receiver Power Generation system. The primary objective of the program described is to establish and verify the manufacturability, performance, durability, and maintenance requirements of the commercial plant heliostat design. End products of the 16 month effort include: (1) design, fabrication, and test of heliostats; (2) preliminary designs of manufacturing, assembly, installation, and maintenance processes for quantity production; (3) detailed design of critical tooling or other special equipment for such processes; (4) refined cost estimates for heliostats and maintenance; and (5) an updated commercial plant heliostat preliminary design. The program management and control system is discussed. (WHK)

None

1978-06-01T23:59:59.000Z

24

EM Quality Assurance Centralized Training Platform Project Plan for 2009-2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT QUALITY ASSURANCE IMPROVEMENT INITIATIVE EM CENTRALIZED TRAINING PLATFORM PROJECT PLAN Prepared by: Date: Approved by: Date: Revision 0 Page 3 of 30 05/11/09 1.0 INTRODUCTION The Department of Energy (DOE) expertise in quality assurance (QA) has degraded significantly over the last 10 years due to workforce attrition and the lack of emphasis on QA principles. Since the 2007 establishment and subsequent implementation of the Office of Environmental Management (EM) Quality Assurance Improvement Initiative, the need for trained QA specialists and personnel familiar with the role of QA in integrated safety management and project management is becoming critical. As EM Field Offices struggle to identify sufficient resources to properly implement the EM Quality

25

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

26

High School Principals' Perceptions of Central Office Administrator Support For Planning, Coordinating, and Evaluating Teaching and the Curriculum  

E-Print Network (OSTI)

This dissertation was designed to gain insight in the area of central office instructional leadership support from the perception of the high school principal. With increasing standards and high student performance expectations coupled with strict federal and state accountability measures, it is impossible for the high school principal to bear the sole responsibility of meeting the needs of their students, staff, and community without further support. Central office is a critical factor in school improvement. The primary aim of this study was to provide insight and a deep understanding how successful high school principals feel supported as the instructional leader specifically in the area of planning, coordinating, and evaluating teaching and the curriculum. The research was guided by a single overarching question: What are high school principal perceptions of support given to them by district central office administrators in the areas of planning, coordinating, and evaluating teaching and the curriculum? Qualitative research was selected for this study to allow for deep and thorough investigation of a small group of high school principals' beliefs regarding the central office administrator instructional leadership support. Interviews were conducted with six successful high school principals from three large school districts. The findings that emerged from the interviews were categorized into eight themes including: the school district focus; instructional leader toolbox; effective use of data; deployment of curriculum and instruction; quality professional development; collaboration; connections; and communication. A synthesis of participants' responses and prior research lead to three overall conclusions: setting high learning expectations; focusing on curriculum and instruction; and establishing district-campus partnerships. Campus principals need assistance in meeting the high standards and challenges they face today. District central office administrators can assist principals become the instructional leader all schools need. This study begins to fill the gap in the literature on how high school principals can be supported by district central office administrators in the areas of planning, coordinating, and evaluating of teaching and the curriculum.

Lawson, Kimberly Kelleher

2011-08-01T23:59:59.000Z

27

Energy Conservation and Development Plan. Southern Tier Central Region, New York  

DOE Green Energy (OSTI)

A summary is presented of the work of 40 volunteers working with regional planners to imagine, assess, and prescribe for the development of local energy resources (wind, solar, biomass, and water) and for conservation of all forms of energy. The plan contains a brief summary of the process the citizens followed in formulating the plan, the plans themselves, and appendices which contain more detailed comments by citizens on the possible consequences of the development of each resource. The areas (Chemung, Steuben, and Schuyler counties) experienced severe natural gas curtailments during the winter of 1976-1977. The formulation of an emergency energy conservation plan is also presented.

Not Available

1979-07-01T23:59:59.000Z

28

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

DOE Green Energy (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

29

Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Hydrate Multi-Year R&D Program Plan NATIONAL METHANE HYDRATE MULTI-YEAR R&D PROGRAM PLAN U.S. Department of Energy Office of Fossil Energy Federal Energy Technology Center...

30

Conceptual design and analysis of a 100-MWe line focus solar central power plant. Test plan  

DOE Green Energy (OSTI)

Plans for a test program are presented whose objectives are: to verify the overall efficiency of a linear parabolic trough solar collector with varied receiver tube subsystem configurations; to compare surface temperatures, and efficiency values to derived values from an analytical model; and to identify the optimal receivr tube and annulus combination as determined by economical, optical, and thermal efficiency. The test facility to be used is described with the aid ofnumerous photographs. The range in conditions under which testing is to be done is briefly described. The instrumentation and measurement plans for the tests are described, and include thermal, flow, and meteorological data. Th data acquisition and processing system is outlined. Means are discussed for calculating efficiency and thermal loss, and requirements for statistical data are given. The test schedule is diagrammed and discussed. (LEW)

Semmens, M.G.; Fong, A.; Collaros, G.J.; Dascher, R.E.; Grassberger, R.E.; Griego, D.B.; Suteber, T.F.

31

10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning  

DOE Green Energy (OSTI)

The various considerations related to the Phase II schedules, material control and personnel training required to effectively implement the program are presented. The flow charts and schedules required to accomplish fabrication, installation, checkout, and personnel training to support the Pilot Plant schedule are identified. The planning addresses receiving, storage and shipment of raw materials, subassemblies, component, subsystems, and complete assemblies. The vendor activities and the major Martin Marietta facilities are included. These are the Mirror Assembly activities at Pueblo, Colorado and the heliostat assembly and installation activities at the Barstow-Daggett Airport and the solar plant. (LEW)

Not Available

1979-08-01T23:59:59.000Z

32

Huge natural gas reserves central to capacity work, construction plans in Iran  

SciTech Connect

Questions about oil production capacity in Iran tend to mask the country's huge potential as a producer of natural gas. Iran is second only to Russia in gas reserves, which National Iranian Gas Co. estimates at 20.7 trillion cu m. Among hurdles to Iran's making greater use of its rich endowment of natural gas are where and how to sell gas not used inside the country. The marketing logistics problem is common to other Middle East holders of gas reserves and a reason behind the recent proliferation of proposals for pipeline and liquefied natural gas schemes targeting Europe and India. But Iran's challenges are greater than most in the region. Political uncertainties and Islamic rules complicate long-term financing of transportation projects and raise questions about security of supply. As a result, Iran has remained mostly in the background of discussions about international trade of Middle Eastern gas. The country's huge gas reserves, strategic location, and existing transport infrastructure nevertheless give it the potential to be a major gas trader if the other issues can be resolved. The paper discusses oil capacity plans, gas development, gas injection for enhanced oil recovery, proposals for exports of gas, and gas pipeline plans.

Not Available

1994-07-11T23:59:59.000Z

33

Geothermal power plants of Mexico and Central America: a technical survey of existing and planned installations  

DOE Green Energy (OSTI)

In this report, the fifth in a series describing the geothermal power plants of the world, the countries of Mexico and of Central America are studied. The geothermal plants are located in areas of recent and active volcanism; the resources are of the liquid-dominated type. Details are given about the plants located at Cerro Prieto in Mexico and at Ahuachapan in El Salvador. In both cases, attention is paid to the geologic nature of the fields, the well programs, geofluid characteristics, energy conversion systems, materials of construction, effluent handling systems, economic factors and plant operating experience. Exploration and development activities are described for other promising geothermal areas in Mexico and El Salvador, along with those in the countries of Costa Rica, Nicaragua, Guatemala, Honduras, and Panama.

DiPippo. R.

1978-07-01T23:59:59.000Z

34

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

35

A study of replacement rules for a parallel fleet replacement problem based on user preference utilization pattern and alternative fuel considerations  

Science Conference Proceedings (OSTI)

Parallel fleet replacement problems deal with determining an optimal replacement schedule that results in a minimal total cost of owning and operating a fleet within a finite planning horizon. In this paper, the fleet consists of service vehicles, varying ... Keywords: Alternative fuels, Parallel fleet replacement, Replacement rules, User preference utilization

Parthana Parthanadee; Jirachai Buddhakulsomsiri; Peerayuth Charnsethikul

2012-08-01T23:59:59.000Z

36

Waste Minimization Plan Prepared by  

E-Print Network (OSTI)

Waste Minimization Plan Prepared by: Environmental Health and Safety Department Revised February 2012 #12;Waste Minimization Plan Table of Contents Policy Statement........................................................... 3 Centralized Waste Management Program

37

Radiation Source Replacement Workshop  

Science Conference Proceedings (OSTI)

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

38

Video face replacement  

E-Print Network (OSTI)

We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

Dale, Kevin

39

NREL: Energy Sciences - Marine Corps Taps NREL to Help Replace...  

NLE Websites -- All DOE Office Websites (Extended Search)

Science News Events Printable Version Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013

The 1940s central steam...

40

A replaceable reflective film for solar concentrators  

DOE Green Energy (OSTI)

The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

Not Available

1991-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Do You Have Windows That Need Replacing? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Do You Have Windows That Need Replacing? Do You Have Windows That Need Replacing? Do You Have Windows That Need Replacing? August 3, 2012 - 2:11pm Addthis This week, Andrea shared the first part of her two-part story about how she replaced her more than 20-year-old windows with new, energy-efficient ones. Replacing old windows can be a great way to reduce the amount of warm and cool air (depending on the season) is leaking right out of your home. This week, we're wondering: Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows? You have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. E-mail your responses to the Energy Saver team at consumer.webmaster@nrel.gov. Addthis Related Articles

42

First SNS Target Replacement  

E-Print Network (OSTI)

· Replacement of the target module was accomplished using only remote handling tooling and procedures (hands operations. Remote Handling Control Room Manipulator Gallery #12;10 Managed by UT-Battelle for the U ­ Interim process fitting leak testing ­ Limitations on remote handling equipment reliability ­ Limitations

McDonald, Kirk

43

ARRANGEMENT FOR REPLACING FILTERS  

DOE Patents (OSTI)

An improved filtered air exhaust system which may be continually operated during the replacement of the filters without the escape of unfiltered air is described. This is accomplished by hermetically sealing the box like filter containers in a rectangular tunnel with neoprene covered sponge rubber sealing rings coated with a silicone impregnated pneumatic grease. The tunnel through which the filters are pushed is normal to the exhaust air duct. A number of unused filters are in line behind the filters in use, and are moved by a hydraulic ram so that a fresh filter is positioned in the air duct. The used filter is pushed into a waiting receptacle and is suitably disposed. This device permits a rapid and safe replacement of a radiation contaminated filter without interruption to the normal flow of exhaust air.

Blomgren, R.A.; Bohlin, N.J.C.

1957-08-27T23:59:59.000Z

44

Steam generator replacement overview  

Science Conference Proceedings (OSTI)

Since nuclear power began to be widely used for commercial purposes in the 1960s, unit operators have experienced a variety of problems with major components. Although many of the problems have diminished considerably, those associated with pressurized water reactor (PWR) steam generators persist. Steam generator problems rank second, behind refueling outages, as the most significant contributor to lost electricity generation. As of December 31, 1995, 38 steam generators had been replaced in 13 of the 72 operating PWRs, and three units had been shut down prematurely, due primarily (or partially) to degradation of their steam generators: Portland General Electric`s Trojan unit, located in Prescott, OR, in 1992; Southern California Edison`s San Onofre 1, located in San Clemente, CA, in 1992; and Sacramento Municipal Utility District`s Rancho Seco unit in 1989. In the coming years, operators of PWRs in the US with degraded steam generators will have to decide whether to make annual repairs (with eventual derating likely), replace the generators or shut the plants down prematurely. To understand the issues and decisions utility managers face, this article examines problems encountered at steam generators over the past few decades and identifies some of the remedies that utility operators and the nuclear community have employed, including operational changes, maintenance, repairs and steam generator replacement.

Chernoff, H. [Science Applications International Corp., McLean, VA (United States); Wade, K.C. [USDOE Energy Information Administration, Washington, DC (United States)

1996-01-01T23:59:59.000Z

45

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

46

EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78: 300 Area Steam Plant Replacement, Hanford Site, Richland, 78: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for a proposed energy conservation measure for a number of buildings in the 300 Area of the U.S. Department of Energy Hanford Site. The proposed action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a source for many of these units and constructing a central control building to operate and maintain the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 12, 1997 EA-1178: Finding of No Significant Impact

47

TRU waste inventory collection and work-off plans for the centralization of TRU waste characterization at INL - on your mark - get set - 9410  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage ofTransuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization ofthis TRU waste will avoid the cost ofbuilding treatment, characterization, certification, and shipping capabilities at each ofthe small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all ofthe small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number ofwaste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTP at the INL will reduce the volume ofmuch of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

Mctaggert, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila [Los Alamos National Laboratory; Gadbury, Casey [CBFO

2009-01-01T23:59:59.000Z

48

TRU waste inventory collection and work off plans for the centralization of TRU waste characterization/certification at INL - on your mark - get set - 9410  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) amended the Record of Decision (ROD) for the Waste Management Program: Treatment and Storage of Transuranic Waste to centralize transuranic (TRU) waste characterization/certification from fourteen TRU waste sites. This centralization will allow for treatment, characterization and certification ofTRU waste from the fourteen sites, thirteen of which are sites with small quantities ofTRU waste, at the Idaho National Laboratory (INL) prior to shipping the waste to the Waste Isolation Pilot Plant (WIPP) for disposal. Centralization of this TRU waste will avoid the cost of building treatment, characterization, certification, and shipping capabilities at each of the small quantity sites that currently do not have existing facilities. Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Nuclear Technology and Engineering Center (INTEC) will provide centralized shipping facilities, to WIPP, for all of the small quantity sites. Hanford, the one large quantity site identified in the ROD, has a large number of waste in containers that are overpacked into larger containers which are inefficient for shipment to and disposal at WIPP. The AMWTF at the INL will reduce the volume of much of the CH waste and make it much more efficient to ship and dispose of at WIPP. In addition, the INTEC has a certified remote handled (RH) TRU waste characterization/certification program at INL to disposition TRU waste from the sites identified in the ROD.

Mctaggert, Jerri Lynne [Los Alamos National Laboratory; Lott, Sheila A [Los Alamos National Laboratory; Gadbury, Casey [CBFO

2008-01-01T23:59:59.000Z

49

Gulf of Mexico Sales 147 and 150: Central and western planning areas. Volume 2, Sections 4.D. through 9: Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Volume II contains: environmental consequences, part D which includes environmental impacts of the proposed actions and alternatives for the proposed Central Gulf sale 147 and for the proposed Western Gulf sale 150; consultation and coordination; bibliography and special references; preparers; glossary; and appendices.

Not Available

1993-11-01T23:59:59.000Z

50

Guidelines for Intelligent Asset Replacement  

Science Conference Proceedings (OSTI)

EPRI8217s asset management research focuses on developing a rational basis for selecting repair or replacement options for specific classes of equipment by balancing the risks of equipment failure against the costs of continued maintenance or capital replacement. This report, the fourth report on guidelines for asset replacement, discusses methods for making decisions about wood poles. It significantly enhances a prior report on this subject by explicitly modeling pole degradation, inspection and test ef...

2006-12-18T23:59:59.000Z

51

Learning for informative path planning  

E-Print Network (OSTI)

Through the combined use of regression techniques, we will learn models of the uncertainty propagation efficiently and accurately to replace computationally intensive Monte- Carlo simulations in informative path planning. ...

Park, Sooho, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

52

HALON REPLACEMENT RESEARCH - A HISTORICAL ...  

Science Conference Proceedings (OSTI)

... Tapscott, RE, Progress Report on Alternatives and Replacements for Halons, E&P Forum Halon Phase-Out Workshop, London, United Kingdom ...

2011-10-11T23:59:59.000Z

53

Energy efficiency and appliance replacement  

E-Print Network (OSTI)

1004 ENERGY EFFICIENCY AND APPLIANCE REPLACEMENT Jeffrey T.adopt energy efficient appliances, even though the financialmix of energyusing appliances predicts that under plausible

LaFrance, Jeffrey T.

2005-01-01T23:59:59.000Z

54

Replace Kilogram Standard? NIST Weighs Options  

Science Conference Proceedings (OSTI)

... Replace Kilogram Standard? ... For some time, scientists have considered replacing the kilogram mass standard with a natural constant. ...

55

Gulf of Mexico Sales 147 and 150: Central and Western planning areas. Final environmental impact statement, Volume 1: Sections 1 through 4.C  

SciTech Connect

This Final Environmental Impact Statement (EIS) covers the proposed 1994 Gulf of Mexico OCS oil and gas lease sales [Central Gulf of Mexico Sale 147 (March 1994) and Western Gulf of Mexico Sale 150 (August 1994)]. This document includes the purpose and background of the proposed actions, the alternatives, the descriptions of the affected environment, and the potential environmental impacts of the proposed actions and alternatives. Proposed mitigating measures and their effects are analyzed, in addition to potential cumulative impacts resulting from proposed activities.

Not Available

1993-11-01T23:59:59.000Z

56

Plant Process Computer Upgrade Guidelines, Volume 1: Replacement Guidelines  

Science Conference Proceedings (OSTI)

The gradual obsolescence of the original plant process computers at nuclear power plants decreases their effectiveness in supporting plant operation and maintenance. This project, based on the practical experience of utility personnel, presents guidelines on plant process computer replacement planning and implementation.

1993-01-01T23:59:59.000Z

57

Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Strategic Plan Print ALS Strategic Plan Update: March 2013 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

58

Southeast Washington Subbasin Planning Ecoregion  

E-Print Network (OSTI)

. Historic (potential) central arid steppe vegetation zone in the Southeast Washington Subbasin Planning miles of central Washington and occurs in the northwest corner of the Ecoregion is the regularly spacedSoutheast Washington Subbasin Planning Ecoregion Wildlife Assessment Paul R. Ashley and Stacey H

59

10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: system integration laboratory test plan (RADL item 6-4)  

DOE Green Energy (OSTI)

A general demonstration test plan is provided for the activities to be accomplished at the Systems Integration Laboratory. The Master Control System, Subsystem Distributed Process Control, Representative Signal Conditioning Units, and Redline Units from the Receiver Subsystem and the Thermal Storage Subsystem and other external interface operational functions will be integrated and functionally demonstrated. The Beckman Multivariable Control Unit will be tested for frequency response, static checks, configuration changes, switching transients, and input-output interfaces. Maximum System Integration Laboratory testing will demonstrate the operational readiness of Pilot Plant controls and external interfaces that are available. Minimum System Integration Laboratory testing will be accomplished with reduced set of hardware, which will provide capability for continued development and demonstration of Operational Control System plant control application software. Beam Control System Integration Laboratory testing will demonstrate the operational readiness of the Beam Control System equipment and software. (LEW)

Not Available

1980-10-01T23:59:59.000Z

60

Wafer Replacement Cluster Tool (Presentation);  

DOE Green Energy (OSTI)

This presentation on wafer replacement cluster tool discusses: (1) Platform for advanced R and D toward SAI 2015 cost goal--crystal silicon PV at area costs closer to amorphous Si PV, it's 15% efficiency, inexpensive substrate, and moderate temperature processing (<800 C); (2) Why silicon?--industrial and knowledge base, abundant and environmentally benign, market acceptance, and good efficiency; and (3) Why replace wafers?--expensive, high embedded energy content, and uses 50-100 times more silicon than needed.

Branz, H. M.

2008-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0422: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

62

An Economical Decision Model for Water Pipe Replacement Using the Bayesian Theory  

Science Conference Proceedings (OSTI)

According to the limited annual budget for pipeline replacement, the most effective and economical plan is needed to available fund. A variety of factors contribute to pipe breaks, including pipe material, diameter, outer coating, operation pressure, ... Keywords: Bayesian theory, Pipe replacement, Water supply system, Economic, Break factor

Wang Chenwan, Tianqing, Li Ridong, Wei Hongyu

2013-01-01T23:59:59.000Z

63

Replaces EIA-459E OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 (04-94) Replaces EIA-459E OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MANAGEMENT SUMMARY REPORT Page of Public reporting burden for this collection of information is estimated to average 3.38 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork Reduction Project

64

central | OpenEI  

Open Energy Info (EERE)

central central Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 87, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO central EIA Electric power projections Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - SERC Reliability Corporation / Central- Reference Case (xls, 259.1 KiB)

65

Testing of Replacement Bag Material  

Science Conference Proceedings (OSTI)

Recently, the FB-Line bagout material was changed to simplify the processing of sand, slag, and crucible.The results of the strength tests and the outgassing measurements and calculations demonstrate that the proposed replacement nylon bag materials (HRMP and orange anti-static material) are acceptable substitutes for LDPE and the original nylon with respect to mechanical properties.

Laurinat, J.E.

1998-11-03T23:59:59.000Z

66

Sampling streaming data with replacement  

Science Conference Proceedings (OSTI)

Simple random sampling is a widely accepted basis for estimation from a population. When data come as a stream, the total population size continuously grows and only one pass through the data is possible. Reservoir sampling is a method of maintaining ... Keywords: Data stream mining, Random sampling with replacement, Reservoir sampling

Byung-Hoon Park; George Ostrouchov; Nagiza F. Samatova

2007-10-01T23:59:59.000Z

67

Waste Minimization Plan Colorado School of Mines  

E-Print Network (OSTI)

Waste Minimization Plan Colorado School of Mines Prepared by: Environmental Health and Safety Department Revised February 2008 #12;Waste Minimization Plan Table of Contents Policy Statement Based Chemical Inventory and Database................................................4 Centralized Waste

68

Replacement element for automobile thermostat  

Science Conference Proceedings (OSTI)

This patent describes a thermostat replacement element for use in a cooling system in which a continuous stream of coolant normally flows from a radiator through a thermostat to an engine. The thermostat is mounted within a mounting cavity and permits maximum flow of coolant through the cooling system when in an open position. The replacement element comprises a disc-shaped member having a diameter substantially corresponding to the diameter of the mounting cavity. The member is provided with apertures of a predetermined size to permit flow of coolant therethrough at a rate generally corresponding to the rate of flow of coolant through the thermostat when the thermostat is in an open position.

Ferrari, W.

1988-06-07T23:59:59.000Z

69

Catalyst Management Planning  

Science Conference Proceedings (OSTI)

Catalyst used in selective catalytic reduction (SCR) systems for NOx control in coal-fired power plants is susceptible to deactivation over time due to exposure to trace elements contained in the coal. In order to sustain the levels of NOx reduction needed to comply with regulatory requirements, periodic replacement of the catalyst modules with new or regenerated catalyst is an essential element in operating an SCR system. Catalyst management planning is a process whereby decisions are made about when ca...

2010-12-21T23:59:59.000Z

70

Public affairs plan  

SciTech Connect

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the Fiscal Year 1995 UMTRA public affairs program and identify specific activities to be conducted during the year. It also describes the roles of various agencies involved in the conduct of the public affairs program and defines the functions of the Technical Assistance Contractor (TAC) Public Affairs Department. It integrates and replaces the Public Participation Plan (DOE/AL/62350-47D) and Public Information Plan (DOE/AL/623590-71). The plan describes the US Department of Energy`s (DOE) plans to keep stakeholders and other members of the public informed about project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in project decision-making processes. The plan applies to the UMTRA Project Office; the DOE Albuquerque Operations Office, Office of Intergovernmental and External Affairs (OIEA); the UMTRA TAC; the UMTRA Remedial Action Contractor (RAC); and other cooperating agencies.

Not Available

1994-09-01T23:59:59.000Z

71

Strategic Petroleum Reserve Plan. Distribution Plan for the Strategic Petroleum Reserve. Amendment No. 3. Energy Action DOE No. 5  

SciTech Connect

Purpose of this Strategic Petroleum Reserve (SPR) Plan Amendment is to provide a Distribution Plan, setting forth the method of drawdown and distribution of the Reserve. Chapter VII of the SPR Plan contained a Distribution Plan which identified and discussed the major objectives, criteria and other factors that will be considered in developing the detailed plan. This Amendment replaces Chapter VII of the SPR Plan in its entirety.

1979-10-01T23:59:59.000Z

72

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

73

CENTRAL PLATEAU REMEDIATION  

Science Conference Proceedings (OSTI)

A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.

ROMINE, L.D.

2006-02-01T23:59:59.000Z

74

B Plant process piping replacement feasibility study  

SciTech Connect

Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

Howden, G.F.

1996-02-07T23:59:59.000Z

75

Alternatives to proposed replacement production reactors  

SciTech Connect

To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP.

Cullingford, H.S.

1981-06-01T23:59:59.000Z

76

Lesson Plans!  

NLE Websites -- All DOE Office Websites (Extended Search)

you from other teachers, educators, and professionals. These lesson plans are provided free of charge, to help you planning a challenging curriculum that will instill a love of...

77

Medical Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Medical Plans Retiree Medical Insurance Blue Cross Blue Shield of New Mexico (BCBSNM) is the provider of medical benefits. Contact Retiree Insurance Providers Medical plan options...

78

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

79

Central Nevada Seismic Zone Geothermal Region | Open Energy Informatio...  

Open Energy Info (EERE)

mW 0.385 GW 3.85e-4 TW Plants Included in Planned Estimate 4 Plants with Unknown Planned Capacity 9 Geothermal Areas within the Central Nevada Seismic Zone Geothermal Region...

80

Planning Workshop  

Science Conference Proceedings (OSTI)

Planning Workshop on Renewable Energy and Climate Science for the Americas: Metrology and Technology Challenges. ...

2013-12-05T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Categorical Exclusion 4567, MPLE Test Stand Replacement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.Forn1 .Forn1 Project Title: MPLE Test Stand Replacement Project (4567) Oak Ridge Tennessee This work scope is upgrade and replace equipment with a new high-pressure leak testing capability. General AdministrationlManagement DA 1 - Routine business actions DA2 - Administrative contract amendments DA4 Interpretations/rulings for existing regulations DA5 - Regulatory interpretations without environmental effect DA6 Procedural rulemakings upgrade DA7 - Transfer of property, use unchanged DA8 - Award of technical supportlM&O/personal service contracts DA9 - Info gathering, analysis, documentation, dissemination, and training DA I 0 - Reports on non-DOE legislation DAII Technical advice and planning assistance construction/operation/decommissioning DA 12 -

82

Replacing Fluorescent Lightbulbs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs Replacing Fluorescent Lightbulbs July 29, 2012 - 6:37pm Addthis Although fluorescent lightbulbs are generally energy efficient, you can replace them with new, even more efficient bulbs that use better electrodes and coatings than older ones. | Photo courtesy of ©iStockphoto.com/JoLin. Although fluorescent lightbulbs are generally energy efficient, you can replace them with new, even more efficient bulbs that use better electrodes and coatings than older ones. | Photo courtesy of ©iStockphoto.com/JoLin. What does this mean for me? Today's fluorescent light fixtures and bulbs are far more efficient than older ones. You can replace fluorescent bulbs and ballasts with more efficient ones to save money and energy. All fluorescent bulbs contain a very small amount of mercury:

83

Chemistry and Metallurgy Research Replacement - Nuclear Facility...  

National Nuclear Security Administration (NNSA)

Chemistry and Metallurgy Research Replacement - Nuclear Facility (CMRR-NF SEIS) | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing...

84

EA-1636: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

85

Security Plans  

Science Conference Proceedings (OSTI)

... Appendix A Glossary - A glossary of security terms used within the security planning document. ... F, Glossary. None applicable.

2013-09-30T23:59:59.000Z

86

Microsoft Word - Appendix L_ContingencyPlan.doc  

Office of Legacy Management (LM)

Well Field Contingency Plan U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page L-3 L1.0 Planning and Preparation Under this contingency plan, which supersedes the Well Field Contingency Plan (DOE 1992b), any production capacity lost to the existing well field due to confirmed contaminant migration from the Weldon Spring Quarry (Quarry) will be replaced. While it is highly unlikely that such measures will be implemented, this plan defines the minimum planning and preparation required to facilitate a rapid and effective response. Planning and preparation measures include the following: * Selection of a reliable alternate source of water to replace or supplement the existing well field. * Preparation of a plan for data collection to facilitate development of the selected alternate

87

DRAFT Bear Safety Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Bear Safety Plan June 2010 Bear Safety Plan June 2010 NSA_bsp_Rev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Bear Safety Plan Background As a major part of DOE's participation in the US Global Change Research Program (USGCRP), the North Slope of Alaska (NSA) and Adjacent Arctic Ocean (AAO) Climate Research Facility (ACRF) exists on the North Slope of Alaska with its Central Facility near the town of Barrow. A secondary facility exists at Atqasuk, a town 100km inland from Barrow. Other instrumentation locations in more remote areas on the North Slope may be established in later stages of the project. Polar bears, and to a lesser extent, brown bears (barren ground grizzly) are significant hazards within the ACRF/NSA/AAO

88

Comprehensive facilities plan  

Science Conference Proceedings (OSTI)

The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

NONE

1997-09-01T23:59:59.000Z

89

Mitigation Action Plans (MAP) and Related Documents | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Delaware Lewes Campus Onsite Wind Energy Project March 1, 2011 EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission...

90

Community Energy Planning A Guide for Communities Volume 2 -...  

Open Energy Info (EERE)

Volume 2 - The Community Energy Plan AgencyCompany Organization Natural Resources Canada Sector Energy, Land Focus Area Energy Efficiency - Central Plant, Energy Efficiency,...

91

Hoisting & Rigging Lift Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Hoisting & Rigging Lift Plan Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 1 of 3 General Information Lift Plan Document # Plan prepared by: Describe the load or items to be lifted: Could the load, if dropped, release hazardous materials or radioactivity? No Yes (describe) Is the load irreplaceable or would it be very costly to replace if damaged? No Yes (describe) Brief description of lift activities (specify if rolling or flipping involved) Equipment Information Equipment ID: Equipment custodian: Rated capacity: Operator capacity : Personnel Protective Equipment (PPE) Steel-toed shoes Required for all personnel involved with lift activity to protect from crushing of feet/toes

92

Replacement solvents for use in chemical synthesis  

DOE Patents (OSTI)

Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

2001-05-15T23:59:59.000Z

93

Task Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

94

Decommissioning Planning  

Science Conference Proceedings (OSTI)

The purpose of this EPRI Technical Report is to provide a series of pre-planning guidance documents for the decommissioning of a nuclear power plant. This guidance is based in part upon Nuclear Decommissioning Plans (NDPs) developed by Commonwealth Edison (now Exelon) following the premature closure of Zion Station in 1998 as well as from other industry references and experience. These NDPs focus on the planning activities over the period from prior to final shutdown through the transition period into de...

2006-11-15T23:59:59.000Z

95

Acquisition Plan Strategy and Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 01 ACQUISITION PLAN STRATEGY AND GUIDANCE NOTE: The process provided below is not intended to replace an agency's acquisition planning requirements. INSTRUCTIONS 1. Work with your DOE Federal Finance Specialist to determine whether a "pay from savings" project is feasible. a. Determine if appropriated dollars are available to offset some of the costs. b. Consider alternative finance options: Energy Savings Performance Contract (ESPC), Utility Energy Service Contract (UESC), Power Purchase Agreement (PPA), or Enhanced Use Lease (EUL) Scott Wolf 6848 Cooper Point Road NW Olympia, WA 98502 Phone: 360-866-9163 Fax: 360-866-9683 scott.wolf@ee.doe.gov Serving Montana, Wyoming, Utah, Colorado, Nebraska, New Mexico,

96

Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Plan (SSMP) to be submitted to Congress after the April 2010 release of the Nuclear Posture Review Report. It is aligned with the President's National Security Strategy...

97

Emergency Plans  

Science Conference Proceedings (OSTI)

... Early Dismissal (Early Closing) Due to Inclement Weather - Snow/Ice or Emergency Situation. ... Emergency Situation - "Shelter-in-Place" Plan. ...

2013-02-18T23:59:59.000Z

98

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

99

Information Resources: LED Replacement Lamps: Current Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral replacement lamps - currently in its second draft. Robert Lingard of Pacific...

100

Marin County- Wood Stove Replacement Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CENTRAL FILES  

Office of Legacy Management (LM)

/ .- / .- ~ _. ,- *-.* . . CENTRAL FILES +, a/ o(-t.z2-5 AlLO 1 Pab-FJr 3. 19% TYtxP REPaT To A&7bA cM.m rlmc)HA~ ON JANtJm 23, 1956 f. A. W~~~+Y, M.D. c. 1. 08huRann 8nd J. A. Hlaeririg ob3e8tilw of Trlpr in @ ttd~, (;rulw 2?), 1956, a ttip na nda to UM Crrrit &abw8tury, cword, Ohio. The purpow o? this trip u&a to aondwt the WMnd ti 8 #etia8 of indUrtF%al mgiene run~yr uhiah hre been Thwr8port ia 8 66mpondzLusofthe Amu4ll;rmtr forth&, rtsnyu@raaaderith~.~~M Alb8ugh, emamrud~~roft&~b8 Cnft UbOP&tOraJ'. Duaar&ptian of Trtpr The m88h&nlng oper8t1oM 8t the Alba ah6p lmm UlrrWarf tho# sf&&8mBthrrbrsrtbiefint~~#rru&. r%vo tUX!'lWt %&t&88, m (1) M8hb8 UthM, iOUr 4 th 5) urbthPW(3)dF%ll pSW888SUW8 ba-8

102

East Central Electric Cooperative - Residential Rebate Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

East Central Electric Cooperative - Residential Rebate Program East Central Electric Cooperative - Residential Rebate Program East Central Electric Cooperative - Residential Rebate Program < Back Eligibility Residential Savings Category Appliances & Electronics Heating & Cooling Commercial Heating & Cooling Cooling Program Info State Oklahoma Program Type Utility Rebate Program Rebate Amount Replacement ground source heat pump - $150 per ton Complete system (unit and ground loop) - $750 per ton Electric water heater - $150 Energy Star Room AC - $50 Energy Star clothes washer - varies depending on cost Energy Star dishwasher - varies depending on cost Provider East Central Electric Cooperative East Central Electric Cooperative offers rebates to residential customers to install energy-efficient ground source heat pumps, electric water

103

GRIPS Plan  

DOE Green Energy (OSTI)

The GRIPS (Geothermal Resources Impact Projection Study) Commission was established by a Joint Powers Agreement between the California Counties of Lake, Mendocino, Napa, and Sonoma. The objectives of GRIPS are primarily to develop and use a cooperative environmental data collection and use system including natural, social, and economic considerations to facilitate their independent decisions and those of State and Federal agencies related to the environmental effects of geothermal development. This GRIPS Plan was prepared from a wide range of studies, workshops, and staff analyses. The plan is presented in four parts: summary and introduction; environmental data status report; planned programs; and budget. (MHR)

Not Available

1978-07-31T23:59:59.000Z

104

Steam Plant Replaces Outdated Coal-Fired System | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steam Plant Replaces Outdated Coal-Fired System Steam Plant Replaces Outdated Coal-Fired System September 1, 2012 - 12:00pm Addthis A new natural gas-fired steam plant will replace...

105

Optics Supply Planning System  

Science Conference Proceedings (OSTI)

The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

Gaylord, J

2009-04-30T23:59:59.000Z

106

Test plan  

U.S. Energy Information Administration (EIA)

3.0 TEST PLAN METHODOLOGY 8. 3.1 Assumptions 8. 3.2 Methodology 8. 4.0 COMMENTS ON INITIAL VIEW OF THE DATA 16 1.0 INTRODUCTION. EIA tasked Allied ...

107

Waste minimization plan, T plant facilities  

SciTech Connect

This document contains the waste minimization plan for the T Plant facilities, located in the 200 West Area of the Hanford Site in south central Washington State. A waste minimization plan is one part of a multi-faceted waste management program; this waste minimization plan documents the goals and techniques of the waste minimization program, identifies methods for evaluating the program and ensuring quality assurance, and establishes the current baseline waste generation volume estimates.

Kover, K.K.

1997-01-01T23:59:59.000Z

108

Replacement of charcoal sorbent in the VOST  

SciTech Connect

EPA Method 0030, the Volatile Organic Sampling Train (VOST), for sampling volatile organics from stationary sources, specifies the use of petroleum-base charcoal in the second sorbent tube. Charcoal has proven to be a marginal performer as a sampling sorbent, partly due to inconsistency in analyte recovery. In addition, commercial availability of petroleum charcoal for VOST tubes has been variable. Lack of data on comparability and variability of charcoals for VOST application has created uncertainty when other charcoals are substituted. Five potential sorbent replacements for charcoal in Method 0030 were evaluated along with a reference charcoal. Two of the sorbents tested, Ambersorb XE-340 and Tenax GR, did not perform well enough to qualify as replacements. Three candidates, Anasorb 747, Carbosieve S-III and Kureha Beaded Activated Charcoal, performed adequately, and produced statistically equivalent results. Anasorb 747 appears to be an acceptable replacement for petroleum charcoal, based on a combination of performance, availability, and cost.

Johnson, L.D.; Fuerst, R.G.; Foster, A.L.; Bursey, J.T.

1993-01-01T23:59:59.000Z

109

Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle Replacement Grants to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle Replacement Grants on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle Replacement Grants

110

Heart Valve Lesson Plan Biomedical Engineering  

E-Print Network (OSTI)

Heart Valve Lesson Plan Biomedical Engineering Objective · Introduce students to biomedical Learning Outcomes · Students will understand the role and function of heart valves. · Students will learn does a heart valve work? · Why do we need to replace heart valves? Time Required (Itemized) · Lecture

Provancher, William

111

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

112

Measure Guideline: Window Repair, Rehabilitation, and Replacement  

SciTech Connect

This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

Baker, P.

2012-12-01T23:59:59.000Z

113

Energy Efficient Buffer Cache Replacement Jianhui Yue  

E-Print Network (OSTI)

back to the active state. The transition from a lower power state to a higher one re- quires some significantly increases the en- ergy saving opportunities through DAM overlapping and power state transition replacement algorithms only aim to optimize cache hit rates and do not consider the power status of memory

Zhu, Yifeng

114

Alaska Strategic Energy Plan and Planning Handbook | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the...

115

Solid Waste Management Program Plan  

SciTech Connect

The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

Duncan, D.R.

1990-08-01T23:59:59.000Z

116

NREL: Technology Transfer - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

117

NREL: Biomass Research - Marine Corps Taps NREL to Help Replace Aging Steam  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

118

NREL: Technology Deployment - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

119

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

120

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

122

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

123

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

124

Managing concurrency in temporal planning using planner-scheduler interaction  

Science Conference Proceedings (OSTI)

Metric temporal planning involves both selecting and organising actions to satisfy the goals and also assigning to each of these actions its start time and, where necessary, its duration. The assignment of start times to actions is a central concern ... Keywords: Planning and scheduling, Temporal planning, pddl 2.1

Andrew Coles; Maria Fox; Keith Halsey; Derek Long; Amanda Smith

2009-01-01T23:59:59.000Z

125

OLADE Sustainable Energy Planning Manual | Open Energy Information  

Open Energy Info (EERE)

OLADE Sustainable Energy Planning Manual OLADE Sustainable Energy Planning Manual Jump to: navigation, search Tool Summary Name: OLADE Sustainable Energy Planning Manual Agency/Company /Organization: Latin American Energy Organization Sector: Energy Focus Area: Energy Efficiency, Renewable Energy Topics: Implementation, Background analysis Website: www.olade.org/proyectoPlanificacionEnergetica.html Country: Costa Rica, El Salvador, Guatemala, Honduras, Nicaragua, Panama, Mexico, Argentina, Bolivia, Brazil, Chile, Colombia, Ecuador, Guyana, Paraguay, Peru, Suriname, Uruguay, Venezuela, Barbados, Cuba, Grenada, Haiti, Jamaica, Trinidad & Tobago, Dominican Republic Central America, Central America, Central America, Central America, Central America, Central America, Central America, South America, South America, South America, South America, South America, South America, South America, South America, South America, South America, South America, South America, Caribbean, Caribbean, Caribbean, Caribbean, Caribbean, Caribbean, Caribbean

126

HVAC equipment replacement for best size and efficiency  

DOE Green Energy (OSTI)

The purpose of this project was to explore the potential benefits of HVAC equipment replacement for buildings owned by the City of Phoenix. The specific research objectives were as follows: Establishment an understanding of the magnitude and sources of saving available through equipment replacement; Establish an economic model for understanding equipment replacement and deciding when equipment should be replaced; Establish technical methods for calculating savings from replacement of various types of equipment; Demonstrate the replacement of a major item of HVAC equipment and document the savings through actual experimentation and measurement; and Provide guidance material for other jurisdictions wishing to investigate equipment replacement. 11 figs., 9 tabs.

Teji, D.S.

1988-02-01T23:59:59.000Z

127

central | OpenEI Community  

Open Energy Info (EERE)

central Home OpenEI Community Central Description: The central OpenEI community for students, scientists, researchers, enthusiasts, analysts and developers. central OpenEI town...

128

Baseline vs. Replacement High Bay Lighting Evaluation  

Science Conference Proceedings (OSTI)

Energy efficient lighting has been a means to significant energy savings for many facilities around the world. New developments in fluorescent, induction, LED (light-emitting diode), and plasma lighting technologies have spurred various building managers to replace or retrofit existing lighting fixtures. These advances in lighting sources often allow conservation of electricity, better quality of light, and more flexibility in the control of light. However, these new lighting sources still have ...

2013-11-06T23:59:59.000Z

129

Future land use plan  

Science Conference Proceedings (OSTI)

The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

NONE

1995-08-31T23:59:59.000Z

130

Energy planning and management plan  

Science Conference Proceedings (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

131

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

132

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

133

Berkeley Lab Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Development (LDRD) BER Review Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links Strategic Planning Laboratory Directed Research and...

134

Plan Descriptions & Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Descriptions & Summaries Retiree Insurance Plans Retiree health and welfare benefits are managed by AonHewitt and Associates. Contact Retiree Insurance Providers Plan...

135

Microsoft Word - B-8.Replacement-3.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Rate Schedule Replacement-3 Availability: This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the Government and the customer from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, Cordell Hull, and Laurel Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") . Applicability: This rate schedule shall be applicable to the sale of wholesale energy purchased to

136

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence...

137

Central Station DHC Phase 1 feasibility  

SciTech Connect

This project assisted a private real estate developer in technically assessing the feasibility of integrating a central DHC system into a proposed 72 acre area mixed-use Planned Development (Central Station) just south of the Chicago Central Business District (Loop). The technical assessment concluded that a district heating and cooling system for Central Station will be feasible, provided that a major anchor load can be connected to the system. The system conceived for the site employs a modular approach that adjusts production capacity to actual load growth. The design concept includes gas-fired boilers for heating, gas turbine driven chillers for base loading, electric motor driven chillers for peaking, steam turbines for peak power and back pressure operation, and chilled water storage. Energy will be supplied to the users in the form of steam or low temperature hot water for heating, and low temperature chilled water for cooling.

Henderson, H.L.

1992-03-01T23:59:59.000Z

138

Lessons Learned: Creating the Chicago Climate Action Plan | Open Energy  

Open Energy Info (EERE)

Lessons Learned: Creating the Chicago Climate Action Plan Lessons Learned: Creating the Chicago Climate Action Plan Jump to: navigation, search Name Lessons Learned: Creating the Chicago Climate Action Plan Agency/Company /Organization City of Chicago Partner Global Philanthropy Partnership, ICLEI Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Topics Low emission development planning Resource Type Lessons learned/best practices Availability Free Publication Date 6/1/2008 Website http://www.chicagoclimateactio Locality Chicago, IL References Lessons Learned: Creating the Chicago Climate Action Plan[1] Overview

139

Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Vehicle Vehicle Replacement Vouchers to someone by E-mail Share Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Facebook Tweet about Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Twitter Bookmark Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Google Bookmark Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Delicious Rank Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on Digg Find More places to share Alternative Fuels Data Center: Clean Vehicle Replacement Vouchers on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Vehicle Replacement Vouchers The Texas Commission on Environmental Quality administers the AirCheckTexas

140

Solid-State Lighting: Text-Alternative Version: LED Replacements...  

NLE Websites -- All DOE Office Websites (Extended Search)

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps to someone by E-mail Share Solid-State Lighting: Text-Alternative Version: LED Replacements for Linear...

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Solid-State Lighting: LED Replacements for Linear Fluorescent...  

NLE Websites -- All DOE Office Websites (Extended Search)

LED Replacements for Linear Fluorescent Lamps Webcast to someone by E-mail Share Solid-State Lighting: LED Replacements for Linear Fluorescent Lamps Webcast on Facebook Tweet about...

142

Usable Science? The U.K. Climate Projections 2009 and Decision Support for Adaptation Planning  

Science Conference Proceedings (OSTI)

With future changes in climate being inevitable, adaptation planning has become a policy priority. A central element in adaptation planning is scientific expertise and knowledge of what the future climate may hold. The U.K. Climate Projections ...

Samuel Tang; Suraje Dessai

2012-10-01T23:59:59.000Z

143

Mitigation Action Plan  

Science Conference Proceedings (OSTI)

This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

Not Available

1994-02-01T23:59:59.000Z

144

Replacement solvents for use in chemical synthesis - Energy ...  

The replacement solvents may be readily recovered from the reaction train using conventional methods. Inventors: Molnar; Linda K. (Philadelphia, PA), ...

145

Flight Plan  

E-Print Network (OSTI)

Developing broader linguistic capability and cultural understanding iscritical to prevail in the long war and meet 21 st Century challenges. The Department must dramatically increase the number of personnel proficient in key languagesand make these languages available at all levels of action and decision from the strategic to the tactical. 2006 Quadrennial Defense Review, p. 78 Due to the nature of immediate and likely future challenges, our Joint forces require Airmen capable of influencing the outcomes of US, allied, and coalition operations anywhere in the world. While we, the Air Force, have made considerable initial progress toward building the necessary cross-cultural skills, we recognize the existing processes for obtaining this forceenhancing capability (appropriate culture, region, language and negotiation skills) are not currently mature or robust enough to optimally meet immediate expectations or near-future requirements. Therefore, it is imperative that we tailor our cultural, regional, and language competency development to maximize our efforts and meet Air Force and Joint requirements informed by National guidance. To this end, the Air Force Culture, Region, and Language (CRL) Flight Plan represents our framework for implementing relevant National Security and National Defense strategies via Air Force programs. The dynamic global environment has made Cross-Cultural Competence a critical and necessary capability for the Total Force. The Air Force CRL Flight Plan supports the

unknown authors

2009-01-01T23:59:59.000Z

146

Microsoft Word - qa_plan1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SJ-RT SJ-RT Smith Jones Rapid Transit Software Quality Assurance Plan February 1997 U. S. DEPARTMENT OF ENERGY Replace with appropriate organization name qa_plan1.doc ii 02/27/07 Change Control Page The following information is being used to control and track modifications made to this document. 1) Revision Date: mm/dd/yy Author: Section(s): Page Number(s): Summary of Change(s): 2) Revision Date: mm/dd/yy Author: Section(s): Page Number(s): Summary of Change(s): qa_plan1.doc iii 02/27/07 Title Page Document Name: Smith Jones Rapid Transit (SJ-RT) Software Quality Assurance Plan (SQAP) Publication Date: February 2007 Revision Date: Contract Number: Project Number: Prepared by: M. Polo Approval: __________________________

147

SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

148

ARM - SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

149

Environmental information management plan  

Science Conference Proceedings (OSTI)

The Environmental Information Management Plan provides an overview of the management of environmental information generation by Hanford Site programs. The long-term nature of environmental programs requires that electronic data, documents, and other materials be kept for extended periods in a secure, controlled, and retrievable manner. An important part of the program is the maintenance of administrative records under the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989). The Environmental Information Management Plan introduces Westinghouse Hanford records management and engineering document control systems and their relationship to environmental programs. Specific information is provided about the operation of the Environmental Data Management Center, a central facility that receives, processes, and maintains information related to environmental program activities. The Environmental Data Management Center maintains a reference file, coordinates administrative record activities, and distributes administrative record indexes and administrative record documents to the US Environmental Protection Agency, the US Department of Energy, the Washington State Department of Ecology, and four information repositories. 43 refs., 16 figs., 5 tabs.

Michael, L.E.; Main, G.C.; See, E.J.

1990-03-01T23:59:59.000Z

150

East North Central Pa  

Gasoline and Diesel Fuel Update (EIA)

East East North Central Pa cif ic Contiguous Mountain West North Central West South Central Pacific Noncontiguous East South Central Sout h At lant ic Middle Atlantic New England 35. Average Price of Natural Gas Delivered to Consumers by Census Division, 1995-1996 (Dollars per Thousand Cubic Feet) Table Census Division Residential Commercial 1995 1996 1995 1996 New England ........................................................... 9.06 9.03 6.78 6.96 Middle Atlantic ......................................................... 7.75 8.00 6.04 6.57 East North Central ................................................... 5.05 5.44 4.57 4.94 West North Central .................................................. 4.97 5.54 4.08 4.71 South Atlantic........................................................... 6.89 7.50 5.33 6.14 East South Central...................................................

151

Replaces DOE F 5120.2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

700.2 700.2 (09-93) Replaces DOE F 5120.2 (02-90) edition may be used 1. INITIATOR: NAME & SIGNATURE ORGANIZATION CODE TELEPHONE NO. 2. PROJECT TITLE: 3. RESPONSIBLE ASSISTANT SECRETARY: 4. RESPONSIBLE OPERATIONS OFFICE: 5. M&O CONTRACTOR NAME: 6. WORK AUTHORIZATION NO.: FUNDS HEREBY AUTHORIZED 7. REVISION: B&R No. $000 13. WORK AUTHORIZED: (Brief description, schedule, results or products and reporting requirements, and any shifting of funds permitted within the work authorization): U.S. DEPARTMENT OF ENERGY Management & Operating (M&O) Contract Work Authorization WORK AUTHORIZATION 14. WORK AUTHORIZATION OFFICIAL: 15. OPERATIONS OFFICE OFFICIAL: 16. M&O CONTRACTOR OFFICIAL: NAME & SIGNATURE DATE 9. PERFORMANCE PERIOD COVERED BY

152

Cogeneration Planning  

E-Print Network (OSTI)

Cogeneration, the sequential use of a fuel to generate electricity and thermal energy, has become a widely discussed concept in energy engineering. American-Standard, a world-wide diversified manufacturing corporation, has actively been pursuing cogeneration projects for its plants. Of concern to us are rapidly escalating electrical costs plus concern about the future of some utilities to maintain reserve capacity. Our review to date revolves around (1) obtaining low-cost reliable fuel supplies for the cogeneration system, (2) identifying high cost/low reserve utilities, and (3) developing systems which are base loaded, and thus cost-effective. This paper will be an up-to-date review of our cogeneration planning process.

Mozzo, M. A. Jr.

1985-05-01T23:59:59.000Z

153

Excess Uranium Inventory Management Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan Excess Uranium Inventory Management Plan The 2013 Excess Uranium Inventory Management Plan describes a framework for the effective management of the Energy Department's surplus uranium inventory in support of meeting its critical environmental cleanup and national security missions. The Plan is not a commitment to specific activities beyond those that have already been contracted nor is it a restriction on actions that the Department may undertake in the future as a result of changing conditions. It replaces an earlier plan issued in 2008 and reflects updated information on the Department of Energy's management and disposition of its excess uranium inventories. Excess Uranium Inventory Management Plan More Documents & Publications

154

Central and Eastern United States Seismic Source Characterization Project: Workshop 2 Proceedings  

Science Conference Proceedings (OSTI)

These proceedings document the second of three workshops held as part of the Central and Eastern United States Seismic Source Characterization (CEUS SSC) for Nuclear Facilities Project to replace the Seismic Hazard Methodology for the Central and Eastern United States (EPRI report NP-4726, July 1986).

2009-05-27T23:59:59.000Z

155

Central and Eastern United States Seismic Source Characterization Project: Workshop 3 Proceedings  

Science Conference Proceedings (OSTI)

These proceedings document the third and final workshop held as part of the Central and Eastern United States Seismic Source Characterization (CEUS SSC) for Nuclear Facilities Project to replace the Seismic Hazard Methodology for the Central and Eastern United States (EPRI report NP-4726, July 1986).

2009-11-04T23:59:59.000Z

156

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts July 29, 2012 - 5:16pm Addthis Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. What does this mean for me? For the greatest energy efficiency, use new fixtures with new lightbulbs. Replace A-type lightbulbs with more energy-efficient options such as CFLs, LEDs, and energy-saving (halogen) incandescents. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new

157

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

158

STRATEGIC PLANNING  

E-Print Network (OSTI)

The National Academy of Public Administration is an independent, nonprofit organization chartered by Congress to improve governance at all levelslocal, regional, state, national, and international. The Academys membership of more than 550 Fellows includes current and former members of Congress, cabinet-level appointees, senior federal executives, state and local practitioners, businesspeople, nonprofit leaders, and scholars with distinguished records in public management. Since its establishment in 1967, the Academy has assisted hundreds of federal agencies, congressional committees, state and local governments, civic organizations, and institutions overseas through problemsolving, research, analysis, information sharing, developing strategies for change, and connecting people and ideas. Most reports and papers issued by Academy panels respond to specific requests and needs of public agencies. Projects also address governmentwide and broader societal topics identified by the Academy. In addition to government institutions, the Academy is also supported by businesses, foundations, and nonprofit organizations. A Final Report by a Panel of the NATIONAL ACADEMY OF PUBLIC ADMINISTRATION for the Office of Strategic Planning

Hale Champion; Mary Jane England; Harry Hatry

2001-01-01T23:59:59.000Z

159

Hanford Site Development Plan  

SciTech Connect

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

160

Kinder Morgan Central Florida Pipeline Ethanol Project  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

KINDER MORGAN CENTRAL FLORIDA PIPELINE ETHANOL PROJECT  In December 2008, Kinder Morgan began transporting commercial batches of denatured ethanol along with gasoline shipments in its 16-inch Central Florida Pipeline (CFPL) from Tampa to Orlando, making CFPL the first transmarket gasoline pipeline in the United States to do so. The 16-inch pipeline previously only transported regular and premium gasoline.  Kinder Morgan invested approximately $10 million to modify the line for ethanol shipments which involved chemically cleaning the pipeline, replacing pipeline equipment that was incompatible with ethanol and expanding storage capacity at its Orlando terminal to handle ethanol shipments.  Kinder Morgan is responding to customer interest in ethanol blending. Our Florida

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Centrals.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ER-B-00-01 ER-B-00-01 AUDIT REPORT CENTRAL SHOPS AT BROOKHAVEN NATIONAL LABORATORY MAY 2000 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DEPARTMENT OF ENERGY Washington, DC 20585 May 11, 2000 MEMORANDUM FOR THE MANAGER, CHICAGO OPERATIONS OFFICE FROM: Terry L. Brendlinger, Manager (Signed) Eastern Regional Audit Office Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Central Shops at Brookhaven National Laboratory" BACKGROUND Brookhaven National Laboratory's (Brookhaven) Central Shops Division (Central Shops) provides support services for research and development programs and user facilities. The Department requires its management and operating contractors to evaluate, by performing a

162

Central Internet Database (CID)  

Office of Environmental Management (EM)

RADCM-13 Reports Central Internet Database CID Photo Banner RADCM-13 Archived Reports By State California Adobe PDF Document Colorado Adobe PDF Document Idaho Adobe PDF Document...

163

Corrective Action Investigation Plan for the Central Nevada Test...  

Office of Legacy Management (LM)

focus on the subset of the test related contaminants that are found to be critical in terms of health and safety (e.g., 3 H, 90 Sr, 137 Cs). The uncertainty of the composite (4...

164

ICD Complex Operations and Maintenance Plan  

SciTech Connect

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

165

Control console replacement at the WPI Reactor  

SciTech Connect

With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.

1992-01-01T23:59:59.000Z

166

Polymers replace glass in Nova fuel capsules  

SciTech Connect

The glass fuel-capsule designs used in previous laser-fusion research are not adaptable to the implosion-physics requirements of Nova and other more powerful laser facilities that may be available in the future. As one tries to learn more about the physics of high-density compression, it becomes increasingly important to replace the glass with lower-Z material. Accordingly, the authors have shut down the high-temperature drop-tower furnaces they used to make glass capsules, and they are focusing all their efforts on developing new techniques for making polymer capsules. These capsules are ten times larger in diameter than the glass capsules used in the early days of laser-fusion research, but they are still only one-tenth as large as a high-gain capsule must be. The polymer capsules will be used in classified indirect-drive targets. This article describes how the decisions were made on which polymers to use in the NOVA fuel capsules, the techniques explored, and the properties of the prototype capsules.

Burnham, A.K.

1986-01-01T23:59:59.000Z

167

Low-Carbon Energy for Central America: Building a Regional Model | Open  

Open Energy Info (EERE)

Low-Carbon Energy for Central America: Building a Regional Model Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country Belize, Costa Rica, El Salvador, Guatemala, Honduras, Nicaragua, Panama Central America, Central America, Central America, Central America, Central America, Central America, Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for

168

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

169

Lower Columbia Salmon Recovery Fish & Wildlife Subbasin Plan  

E-Print Network (OSTI)

in south central Washington. The basin encompasses approximately 136 square miles and enters the Columbia in a series of volumes that together comprise a Recovery and Subbasin Plan for Washington lower Columbia River Washington lower Columbia River subbasins consistent with the Regional Plan. These volumes describe

170

LANS DB PENSION PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

171

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600 Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared, safety, and welfare. #12;ACKNOWLEDGEMENTS The Energy Emergency Response Plan was prepared from

172

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Officer Biological (Accident Reports) 2204 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN (CHP) (4/2007) 1

Oliver, Douglas L.

173

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN

Kim, Duck O.

174

Bio-based ethylene able to replace petroleum as a ...  

Biomass and Biofuels Bio-based ethylene able to replace petroleum as a feedstock National Renewable Energy Laboratory. Contact NREL About This ...

175

Replace Kilogram Artifact Now With Definition Based on ...  

Science Conference Proceedings (OSTI)

Replace Kilogram Artifact Now With Definition Based on Nature, Experts Say. ... This started out as a study of the effects of redefining the kilogram. ...

2010-10-05T23:59:59.000Z

176

Solid Oxide Fuel Cells (SOFC) as Military APU Replacements  

NLE Websites -- All DOE Office Websites (Extended Search)

Division Propulsion Directorate Air Force Research Laboratory Solid Oxide Fuel Cells (SOFC) as Military APU Replacements Cleared For Public For Public Release: 88ABW-2010-0196 2...

177

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

DOESC Scientific Facilities Strategic Plan (20 years, major capital projects) * DOE Strategic Plan (7-10 years) * DOE (HEP)Fermilab Strategic Plan (10 years) * FRAFNAL Plan for...

178

NSLS Work Planning & Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Planning & Controls NSLS Work Planning and Control Procedure Lead Working Guidelines Information on Working in Areas Subject to Radiation from VUV Injection Procedure for...

179

NEHRP - Final Plan Development  

Science Conference Proceedings (OSTI)

... However, NEHRP funds do not support targeted ... FEMA does provide linkage of ongoing work in ... Plan discussion about Strategic Planning Principles ...

180

Environmental Implementation Plan - EIP introduction  

SciTech Connect

Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the {open_quotes}Reflections{close_quotes} process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a {open_quotes}Partnership in Environmental Excellence.{close_quotes}

Peterson, G.L.

1993-10-06T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

SMUD's HVAC Programs Ravi Patel-Program Planning  

E-Print Network (OSTI)

1 SMUD's HVAC Programs 5-7-13 Ravi Patel- Program Planning Bruce Baccei- R&D #12;SMUD's Residential contractors trained and BPI certified ­ Majority were pushing only HVAC; now driving the HPP · Program encourages more HVAC replacements to occur through HPP ­ Move away from stand alone programs ­ Start

California at Davis, University of

182

North Central Texas Council of Governments North Central Texas  

E-Print Network (OSTI)

North Central Texas Council of Governments North Central Texas Thinking Ahead Donna Coggeshall North Central Texas Council of Governments #12;North Central Texas Council of Governments Thinking Ahead are for the 12-county MPA #12;North Central Texas Council of Governments Thinking Ahead Development Form #12

Texas at Arlington, University of

183

An opposite view data replacement approach for reducing artifacts due to metallic dental objects  

SciTech Connect

Purpose: To present a conceptually new method for metal artifact reduction (MAR) that can be used on patients with multiple objects within the scan plane that are also of small sized along the longitudinal (scanning) direction, such as dental fillings. Methods: The proposed algorithm, named opposite view replacement, achieves MAR by first detecting the projection data affected by metal objects and then replacing the affected projections by the corresponding opposite view projections, which are not affected by metal objects. The authors also applied a fading process to avoid producing any discontinuities in the boundary of the affected projection areas in the sinogram. A skull phantom with and without a variety of dental metal inserts was made to extract the performance metric of the algorithm. A head and neck case, typical of IMRT planning, was also tested. Results: The reconstructed CT images based on this new replacement scheme show a significant improvement in image quality for patients with metallic dental objects compared to the MAR algorithms based on the interpolation scheme. For the phantom, the authors showed that the artifact reduction algorithm can efficiently recover the CT numbers in the area next to the metallic objects. Conclusions: The authors presented a new and efficient method for artifact reduction due to multiple small metallic objects. The obtained results from phantoms and clinical cases fully validate the proposed approach.

Yazdi, Mehran; Lari, Meghdad Asadi; Bernier, Gaston; Beaulieu, Luc [Department of Electrical Engineering, School of Engineering, Shiraz University, Shiraz 7134851154 (Iran, Islamic Republic of) and Departement de Radio-Oncologie, Ho circumflex tel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada); Department of Electrical Engineering, School of Engineering, Shiraz University, Shiraz 7134851154 (Iran, Islamic Republic of); Departement de Radio-Oncologie, Ho circumflex tel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada); Departement de Physique, de Genie Physique et D'optique, Universite Laval, Quebec, Quebec (Canada) and Departement de Radio-Oncologie, Hotel-Dieu de Quebec, Centre Hospitalier Universitaire de Quebec, 11 Cote du Palais, Quebec, Quebec G1R 2J6 (Canada)

2011-04-15T23:59:59.000Z

184

Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication  

SciTech Connect

A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

Megan Donahue

2009-02-24T23:59:59.000Z

185

Should a coal-fired power plant be replaced or retrofitted?  

SciTech Connect

In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO{sub 2}, NOx, Hg, and CO{sub 2} using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO{sub 2} and NOx controls on the existing unit. An expectation that the CO{sub 2} price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power. 1 ref., 5 figs., 2 tabs.

Dalia Patino-Echeverri; Benoit Morel; Jay Apt; Chao Chen [Carnegie Mellon University, Pittsburgh, PA (USA)

2007-12-15T23:59:59.000Z

186

Replacing Incandescent Lightbulbs and Ballasts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Incandescent Lightbulbs and Ballasts Incandescent Lightbulbs and Ballasts Replacing Incandescent Lightbulbs and Ballasts July 29, 2012 - 5:16pm Addthis Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. Many incandescent lightbulbs can be replaced with more energy efficient options. | Photo courtesy of ©iStockphoto.com/ClarkandCompany. What does this mean for me? For the greatest energy efficiency, use new fixtures with new lightbulbs. Replace A-type lightbulbs with more energy-efficient options such as CFLs, LEDs, and energy-saving (halogen) incandescents. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new lightbulbs gives you the greatest energy savings, reliability, and

187

Energy Replacement Generation Tax Exemption | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement Generation Tax Exemption Replacement Generation Tax Exemption Energy Replacement Generation Tax Exemption < Back Eligibility Commercial Industrial Local Government Residential Savings Category Water Buying & Making Electricity Bioenergy Wind Maximum Rebate None Program Info Start Date 01/01/2008 (retroactively effective) State Iowa Program Type Corporate Exemption Rebate Amount 100% exemption for self-generators, landfill gas and wind Reduced rate for large hydro Provider Iowa Department of Revenue Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax on generation facilities. Under the Energy Replacement Generation Tax Exemption, the following

188

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network (OSTI)

Electrical equipment components are replaced every day because of failure, obsolescence, or upgrade. Because of technological gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage end users to select the most energy efficient equipment when replacing motors, motor drives, transformers, lamps, ballasts, etc., given costs associated with energy consumption when compared with installation. The selection of replacement parts that are compatible with existing system components and loads is critical. The purpose of this paper is to discuss fundamental electrical design principles often overlooked when replacing existing equipment with energy efficient models. NOTE: The views expressed in this paper are those of the author and do not necessarily reflect the views of the United States of America, the U. S. Department of Justice, or the Federal Bureau of Prisons.

Massey, G. W.

2005-01-01T23:59:59.000Z

189

CENTRAL NEVADA-16 January  

Office of Legacy Management (LM)

CENTRAL NEVADA-16 January 1970 UNITED STATES DEPARTMENT OF THE Dl"'TERIOR GEOLOGICAL SURVEY Federal Center. Denver. Colorado 80225 PRELIMINARY REPORT ON TliE GEOLOGIC EFFECTS OF...

190

Central ballast tanker design  

SciTech Connect

The purpose of this paper is to present the CENTRAL BALLAST TANKER Design. This design is intended to reduce the volume of oil spilled from tankers by giving the crew a tanker properly designed and equipped to allow large quantities of oil from ruptured tank(s) to flow safely to a fully-inerted central ballast tank. In addition to reducing the volume of oil spilled, the design also addresses many of the shortcomings of the DOUBLE HULL DESIGN which are increasingly becoming a concern. The following is a brief review of the development of the CENTRAL BALLAST TANKER. The simple operational features, stability, low cost and ease of maintenance of the single hull tanker were important and can be retained with the CENTRAL BALLAST DESIGN.

1997-01-01T23:59:59.000Z

191

North Central Texas Council of Governments North Central...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Central Texas Council of Governments&8217; North Central Texas Alternative Fuel and Advanced Technology Investments initiative is one of 25 Area of Interest 4 Selections...

192

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

193

Guidance for Planning Exercises  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

194

Planning lessens problems, gets benefits of underbalance  

Science Conference Proceedings (OSTI)

A horizontal well planned to be drilled underbalanced required special procedures and countermeasures to prevent formation damage from the mud and downhole tool failures from high temperature. Drilling the well underbalanced helped reduce problems from lost returns and from solids entering and plugging the natural fractures in the Austin chalk. The high bottom hole temperature in the deep Austin chalk in central Louisiana complicates drilling, the mud program, and well design. The first of this two-part series covers the planning, procedures, and well design to alleviate these problems. The next article, which will appear in a future issue, addresses complications during the operation and the equipment used.

Joseph, R.A. [OXY U.S.A. Inc., Houston, TX (United States)

1995-03-20T23:59:59.000Z

195

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Clinical Engineering 2964 #12;TABLE OF CONTENTS CHEMICAL HYGIENE

Oliver, Douglas L.

196

Microsoft Word - prjct planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Checklist Planning Checklist The following checklist is intended to provide system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and preparing project planning activities. The checklist reflects recognized project planning activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies, policies, programs, and procedures for achieving the objectives and goals of the project. The objectives of project planning for information systems projects are summarized as the following: C User's environment is analyzed. C Project objectives and scope are defined. C High-level functional requirements are estimated.

197

MN471018, Work Planning and Control Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

18, Work Planning and Control Manual 18, Work Planning and Control Manual Sponsor: Michael W. Hazen, 4000 Issue Date: January 3, 2007 Revision Date: June 1, 2009 This document is no longer a CPR. This document implements the requirements of Corporate procedure ESH100.1.WPC.1, Plan and Control Work. IMPORTANT NOTICE: A printed copy of this document may not be the document currently in effect. The official version is the online version located on the Sandia Restricted Network (SRN) MN471018 - WORK PLANNING AND CONTROL MANUAL Subject Matter Expert: Brad Elkin; CA Counterpart: Aden Jackson MN471018 Revision Date: June 1, 2009; Replaces Document: October 28, 2008 Implementation Notice: The requirements outlined in this document must be incorporated into approved comprehensive organizational procedures on or before June 30, 2009. New work planned and conducted after June 30, 2009 shall be performed in accordance with this document. Ongoing work, conducted under an existing, current, and approved PHS and TWD (if required), is authorized until the expiration of the applicable PHS, TWD, or June 30, 2010.

198

Centralized Procurement Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Centralized Procurement Program What's New Who to Contact Current Products BOAs MOC Integrated Team Program Elements Future Products Welcome to the Carlsbad Field Office’s (CBFO) Centralized Procurement Program (CPP) Web Page. The purpose of the Centralized Procurement Program is to provide a standardized, economical system of acquisition and distribution of common or critical transuranic (TRU) waste products. The program is available for use by DOE contractors. The program is designed to allow user sites to procure products manufactured to standardized quality, procurement, and engineering requirements. The WIPP Management & Operation Contractor (MOC), Washington TRU Solutions (WTS), administers the program. WTS is the design authority for all products currently offered in the program.

199

2002 WIPP Environmental Monitoring Plan  

SciTech Connect

DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington TRU Solutions LLC

2002-09-30T23:59:59.000Z

200

Central Solenoid Insert Technical Specification  

Science Conference Proceedings (OSTI)

The US ITER Project Office (USIPO) is responsible for the ITER central solenoid (CS) contribution to the ITER project. The Central Solenoid Insert (CSI) project will allow ITER validation the appropriate lengths of the conductors to be used in the full-scale CS coils under relevant conditions. The ITER Program plans to build and test a CSI to verify the performance of the CS conductor. The CSI is a one-layer solenoid with an inner diameter of 1.48 m and a height of 4.45 m between electric terminal ends. The coil weight with the terminals is approximately 820 kg without insulation. The major goal of the CSI is to measure the temperature margin of the CS under the ITER direct current (DC) operating conditions, including determining sensitivity to load cycles. Performance of the joints, ramp rate sensitivity, and stability against thermal or electromagnetic disturbances, electrical insulation, losses, and instrumentation are addressed separately and therefore are not major goals in this project. However, losses and joint performance will be tested during the CSI testing campaign. The USIPO will build the CSI that will be tested at the Central Solenoid Model Coil (CSMC) Test Facility at the Japan Atomic Energy Agency (JAEA), Naka, Japan. The industrial vendors (the Suppliers) will report to the USIPO (the Company). All approvals to proceed will be issued by the Company, which in some cases, as specified in this document, will also require the approval of the ITER Organization. Responsibilities and obligations will be covered by respective contracts between the USIPO, called Company interchangeably, and the industrial Prime Contractors, called Suppliers. Different stages of work may be performed by more than one Prime Contractor, as described in this specification. Technical requirements of the contract between the Company and the Prime Contractor will be covered by the Fabrication Specifications developed by the Prime Contractor based on this document and approved by the Company and ITER. The Fabrication Specifications may reflect some national requirements and regulations that are not fully provided here. This document presents the ITER CSI specifications.

Martovetsky, Nicolai N [ORNL; Smirnov, Alexandre [ORNL

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Mexico/Central America; Trans-Mexico gas line studied  

Science Conference Proceedings (OSTI)

This paper reports that current and future pipe line activity in Mexico and Central America is at a low level, with Pemex constructing a small amount of gas transmission and liquids lines. However, plans for a trans-Mexico gas transmission line for imports and exports advance.

Not Available

1991-11-01T23:59:59.000Z

202

Central Internet Database (CID) Data Dictionary  

Office of Environmental Management (EM)

Data Dictionary Data Dictionary Central Internet Database CID Photo Banner Data Dictionary A | B | C | D | E | F | G | H | I | J | K | L | M N | O | P | Q | R | S | T | U | V | W | X | Y | Z Data Element Name Definition A Annual Disposition WIMS - Planned disposition quantity (total volume of container, as disposed, in m3) reported for each year: FY08 through FY50. B C Chemical Name TRI - (Form R - Part II - Section 1.2) The name of the toxic chemical that has been released and/or transferred during the reporting year. Listed toxic chemicals are those chemicals on the list in Committee Print Number 99-169 of the Senate Committee on Environment and Public Works, titled "Toxic Chemicals Subject to Section 313 of the Emergency Planning and Community Right-To-Know Act of 1986" (42 U.S.C. 11023). Currently, there are over 600 toxic chemicals included on the list subject to reporting.

203

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

204

Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Capability Replacement Laboratory (CRL) Completion Ceremony at the Capability Replacement Laboratory (CRL) Completion Ceremony by Deputy Administrator Anne M. Harrington | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Speeches > Remarks at the Capability Replacement Laboratory (CRL) ... Speech Remarks at the Capability Replacement Laboratory (CRL) Completion Ceremony

205

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site October 22, 2013 - 11:01am Addthis What does this project do? Goal 1. Protect human health and the environment In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to replace an aging water monitoring flume and avoid future repairs that could interrupt data collection. The flume for Rocky Flats Legacy Management Agreement (RFLMA) Point of Evaluation (POE) monitoring location GS10 in South Walnut Creek was located at the bottom of fairly steep channel banks. The bank on the south side shows localized slumping and sliding toward the creek and GS10. Although

206

Mechanism of Concentric Eyewall Replacement Cycles and Associated Intensity Change  

Science Conference Proceedings (OSTI)

To understand the mechanisms responsible for the secondary eyewall replacement cycles and associated intensity changes in intense tropical cyclones (TCs), two numerical experiments are conducted in this study with the Weather Research and ...

Xiaqiong Zhou; Bin Wang

2011-05-01T23:59:59.000Z

207

Replace Pressure-Reducing Valves with Backpressure Turbogenerators  

SciTech Connect

This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

208

A cache-partitioning aware replacement policy for chip multiprocessors  

Science Conference Proceedings (OSTI)

Chip multiprocessors (CMPs) usually employ shared, last-level caches to use on-chip memory resources effectively. Unfortunately, conventional replacement policies applied to shared caches fail to partition memory resources among cores to achieve an optimal ...

Haakon Dybdahl; Per Stenstrm; Lasse Natvig

2006-12-01T23:59:59.000Z

209

Laboratory Evaluation of LED T8 Replacement Lamp Products  

Science Conference Proceedings (OSTI)

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

210

Drop-in replacement biofuels : meeting the challenge  

E-Print Network (OSTI)

This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

Bhargava, Alok (Alok Kishore)

2011-01-01T23:59:59.000Z

211

Marin County - Wood Stove Replacement Rebate Program (California...  

Open Energy Info (EERE)

DSIRE1 Summary The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and...

212

Developing a total replacement cost index for suburban office projects  

E-Print Network (OSTI)

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

213

Solid-State Lighting: Text-Alternative Version: LED Replacement...  

NLE Websites -- All DOE Office Websites (Extended Search)

I'd like to welcome everyone to this webcast on the very timely topic of light emitting diode replacement lamps and the latest on the ENERGY STAR programs efforts in this...

214

Intensity and Structure Changes during Hurricane Eyewall Replacement Cycles  

Science Conference Proceedings (OSTI)

A flight-level aircraft dataset consisting of 79 Atlantic basin hurricanes from 1977 to 2007 was used to develop an unprecedented climatology of inner-core intensity and structure changes associated with eyewall replacement cycles (ERCs). During ...

Matthew Sitkowski; James P. Kossin; Christopher M. Rozoff

2011-12-01T23:59:59.000Z

215

Central waste complex interim safety basis  

Science Conference Proceedings (OSTI)

This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste.

Cain, F.G.

1995-05-15T23:59:59.000Z

216

Guidelines for Replacement Materials for Service Water Systems  

Science Conference Proceedings (OSTI)

Many power plants have ordered replacement materials for service water system components such as piping and heat exchanger tubing, only to find that the replacement materials do not perform as expected. Plant personnel who believed they were procuring like-for-like materials are at a loss as to why more modern materials, and components fabricated from more modern materials, can often provide inferior service, compared to original equipment. This report from the Electric Power Research Institute (EPRI) lo...

2012-08-10T23:59:59.000Z

217

Wellness Planning Session Report  

E-Print Network (OSTI)

Wellness Planning Session Report September 12, 2008 #12;Wellness Planning Session Report Printed.............................................................................1 Explored what wellness program should look like at NMSU .......................2 Considered for the Wellness committee..................................2 Identified the next meeting date and meeting agenda

Castillo, Steven P.

218

Strategic Planning History  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategy for Global Change Research Related Federal Climate Efforts Strategic Planning History Print E-mail Below is a timeline of past strategic plans that have guided The U.S....

219

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

220

Business Continuity Planning  

Science Conference Proceedings (OSTI)

This article considers various strategies for protecting an organisation from both natural and man-made disasters. The differences between business continuity planning, and disaster recovery planning are recognised. 1997 John Wiley & Sons, ...

Martin Nemzow

1997-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Hydrogen Posture Plan  

Fuel Cell Technologies Publication and Product Library (EERE)

The Hydrogen Posture Plan, published in December 2006, outlines a coordinated plan for activities under the Hydrogen Fuel Initiative, both at the Department of Energy and the Department of Transportat

222

RM Capital Investment Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

223

Draft 2013 Annual Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft 2013 Annual Plan Draft 2013 Annual Plan Section 999: Draft 2013 Annual Plan Section 999 - Draft 2013 Annual Plan...

224

Institutional plan. FY 1998--2003  

SciTech Connect

This Institutional Plan for Argonne National Laboratory contains central elements of Argonne`s strategic plan. Chapter II of this document discusses the Laboratory`s mission and core competencies. Chapter III presents the Science and Technology Strategic Plan, which summarizes key features of the external environment, presents Argonne`s vision, and describes how the Laboratory`s strategic goals and objectives map onto and support DOE`s four business lines. The balance of the chapter comprises the science and technology area plans, organized by the four DOE business lines. Chapter IV describes the Laboratory`s ten major initiatives, which cover a broad spectrum of science and technology. Our proposal for an Exotic Beam Facility aims at, among other things, increased understanding of the processes of nuclear synthesis during and shortly after the Big Bang. Our Advanced Transportation Technology initiative involves working with US industry to develop cost-effective technologies to improve the fuel efficiency and reduce the emissions of transportation systems. The Laboratory`s plans for the future depend significantly on the success of its major initiatives. Chapter V presents our Operations and Infrastructure Strategic Plan. The main body of the chapter comprises strategic plans for human resources; environmental protection, safety, and health; site and facilities; and information management. The chapter concludes with a discussion of the business and management practices that Argonne is adopting to improve the quality and cost-effectiveness of its operations. The structure and content of this document depart from those of the Institutional Plan in previous years. Emphasis here is on directions for the future; coverage of ongoing activities is less detailed. We hope that this streamlined plan is more direct and accessible.

1997-07-01T23:59:59.000Z

225

HR Fundamentals Retirement Plans  

E-Print Network (OSTI)

FY 12-13 #12;Professional & Faculty Retirement · TIAA/CREF · Defined Contribution Retirement Plan 401 & State Taxes are deferred · Immediate Vesting · www.tiaa-cref.org (800) 842-2776 FY 12-13 #12;TIAA - Public Employee's Retirement System "Defined Contribution Plan" 3) TIAA/CREF ­ Defined Contribution Plan

Dyer, Bill

226

Sandia Strategic Plan 1997  

SciTech Connect

Sandia embarked on its first exercise in corporate strategic planning during the winter of 1989. The results of that effort were disseminated with the publication of Strategic Plan 1990. Four years later Sandia conducted their second major planning effort and published Strategic Plan 1994. Sandia`s 1994 planning effort linked very clearly to the Department of Energy`s first strategic plan, Fueling a Competitive Economy. It benefited as well from the leadership of Lockheed Martin Corporation, the management and operating contractor. Lockheed Martin`s corporate success is founded on visionary strategic planning and annual operational planning driven by customer requirements and technology opportunities. In 1996 Sandia conducted another major planning effort that resulted in the development of eight long-term Strategic Objectives. Strategic Plan 1997 differs from its predecessors in that the robust elements of previous efforts have been integrated into one comprehensive body. The changes implemented so far have helped establish a living strategic plan with a stronger business focus and with clear deployment throughout Sandia. The concept of a personal line of sight for all employees to this strategic plan and its objectives, goals, and annual milestones is becoming a reality.

1997-12-01T23:59:59.000Z

227

Conversion Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conversion Plan Conversion Plan This template is used to document the conversion plan that clearly defines the system or project's conversion procedures; outlines the installation...

228

Institutional Plan FY 2003 - 2007  

E-Print Network (OSTI)

III. LABORATORY STRATEGIC PLAN DOE Program Focus on ResultsInstitutional Plan addresses the strategic goals of DOE andbelow does not support those elements of the strategic plan

Chartock, Michael; Hansen, Todd

2002-01-01T23:59:59.000Z

229

Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home About Us Strategic Plan Strategic Plan Leadership Budget Our Organization Strategic Plan Careers Our...

230

Training Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

231

STRATEGIC PLAN BECKMAN INSTITUTE  

E-Print Network (OSTI)

............................................................................ 50 Initiative 6: Neural Systems: Repair, Replacement and Augmentation, the purchase of a state-of-the-art magnetic resonance imaging system for rapid data acquisition using high performance gradient systems and multiple receiver channels, upgrading of other imaging modalities

Braun, Paul

232

AEP (Central, North and SWEPCO) - SCORE Program for Schools | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Central, North and SWEPCO) - SCORE Program for Schools Central, North and SWEPCO) - SCORE Program for Schools AEP (Central, North and SWEPCO) - SCORE Program for Schools < Back Eligibility Commercial Industrial Institutional Local Government Schools Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Insulation Windows, Doors, & Skylights Program Info Funding Source AEP Texas (Central, North and SWEPCO) Companies State Texas Program Type Utility Rebate Program Rebate Amount $150/peak kW Provider AEP Texas Central The CitySmart Program is designed to help participants identify energy efficiency opportunities in existing and newly planned city facilities.

233

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

234

Central and Eastern United States Seismic Source Characterization for Nuclear Facilities  

Science Conference Proceedings (OSTI)

This report describes a new seismic source characterization (SSC) model for the Central and Eastern United States (CEUS). It will replace the Seismic Hazard Methodology for the Central and Eastern United States, EPRI Report NP-4726 (July 1986) and the Seismic Hazard Characterization of 69 Nuclear Plant Sites East of the Rocky Mountains, Lawrence Livermore National Laboratory Model, (Bernreuter et al., 1989). The objective of the CEUS SSC Project is to develop a new seismic source model for the CEUS using...

2012-01-31T23:59:59.000Z

235

Cambodia-Sub National Planning for Climate Change (cities, states,  

Open Energy Info (EERE)

Cambodia-Sub National Planning for Climate Change (cities, states, Cambodia-Sub National Planning for Climate Change (cities, states, districts) Jump to: navigation, search Name Cambodia-Sub National Planning for Climate Change (cities, states, districts) Agency/Company /Organization United Kingdom Department for International Development Sector Climate Focus Area Greenhouse Gas Topics Low emission development planning Country Cambodia South-Eastern Asia References Asia Regional [1] This programme will build capacity of central, state and local governments in the region to integrate low carbon, climate resilience objectives into policy, plans and programmes in various sectors. It will provide technical support in the preparation of plans, longer term institutional support to key govt agencies for implementation, and financing for pilot initiatives

236

Vietnam-Sub National Planning for Climate Change (cities, states,  

Open Energy Info (EERE)

Vietnam-Sub National Planning for Climate Change (cities, states, Vietnam-Sub National Planning for Climate Change (cities, states, districts) Jump to: navigation, search Name Vietnam-Sub National Planning for Climate Change (cities, states, districts) Agency/Company /Organization United Kingdom Department for International Development Sector Climate Focus Area Greenhouse Gas Topics Low emission development planning Country Vietnam South-Eastern Asia References Asia Regional [1] This programme will build capacity of central, state and local governments in the region to integrate low carbon, climate resilience objectives into policy, plans and programmes in various sectors. It will provide technical support in the preparation of plans, longer term institutional support to key govt agencies for implementation, and financing for pilot initiatives

237

Indonesia-Sub National Planning for Climate Change (cities, states,  

Open Energy Info (EERE)

Indonesia-Sub National Planning for Climate Change (cities, states, Indonesia-Sub National Planning for Climate Change (cities, states, districts) Jump to: navigation, search Name Indonesia-Sub National Planning for Climate Change (cities, states, districts) Agency/Company /Organization United Kingdom Department for International Development Sector Climate Focus Area Greenhouse Gas Topics Low emission development planning Country Indonesia South-Eastern Asia References Asia Regional [1] This programme will build capacity of central, state and local governments in the region to integrate low carbon, climate resilience objectives into policy, plans and programmes in various sectors. It will provide technical support in the preparation of plans, longer term institutional support to key govt agencies for implementation, and financing for pilot initiatives

238

Myanmar-Sub National Planning for Climate Change (cities, states,  

Open Energy Info (EERE)

Myanmar-Sub National Planning for Climate Change (cities, states, Myanmar-Sub National Planning for Climate Change (cities, states, districts) Jump to: navigation, search Name Myanmar-Sub National Planning for Climate Change (cities, states, districts) Agency/Company /Organization United Kingdom Department for International Development Sector Climate Focus Area Greenhouse Gas Topics Low emission development planning Country Myanmar South-Eastern Asia References Asia Regional [1] This programme will build capacity of central, state and local governments in the region to integrate low carbon, climate resilience objectives into policy, plans and programmes in various sectors. It will provide technical support in the preparation of plans, longer term institutional support to key govt agencies for implementation, and financing for pilot initiatives

239

Sub National Planning for Climate Change (cities, states, districts) | Open  

Open Energy Info (EERE)

Sub National Planning for Climate Change (cities, states, districts) Sub National Planning for Climate Change (cities, states, districts) Jump to: navigation, search Name Sub National Planning for Climate Change (cities, states, districts) Agency/Company /Organization United Kingdom Department for International Development Sector Climate Focus Area Greenhouse Gas Topics Low emission development planning Country Cambodia, China, Indonesia, Myanmar, Vietnam South-Eastern Asia, Eastern Asia, South-Eastern Asia, South-Eastern Asia, South-Eastern Asia References Asia Regional [1] This programme will build capacity of central, state and local governments in the region to integrate low carbon, climate resilience objectives into policy, plans and programmes in various sectors. It will provide technical support in the preparation of plans, longer term institutional support to

240

Report: EM Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

1997-10-01T23:59:59.000Z

242

Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g  

E-Print Network (OSTI)

EE552 Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g September 27, 2010 #12;Reliability Planning OverviewReliability Planning Overview · Midwest ISO Transmission Expansion Plan (MTEP)p ( ) · MTEP Reliability Study Process ­ Planning Criteriag ­ Reliability Analysis

McCalley, James D.

243

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

244

Replaces EIA-459C All Other Editions Are Obsolete OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4600.4 4600.4 (04-94) Replaces EIA-459C All Other Editions Are Obsolete OMB Control No. 1910-0400 U.S. Department of Energy Federal Assistance Budget Information Public reporting burden for this collection of information is estimated to average 1.87 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of Energy, 1000 Independence Avenue, S.W., Washington, DC 20585; and to the Office of Management and Budget (OMB), Paperwork

245

Replaces EIA-459F All Other Editions Are Obsolete OMB Control No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 (10-94) Replaces EIA-459F All Other Editions Are Obsolete OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE PROGRAM/PROJECT STATUS REPORT Public reporting burden for this collection of information is estimated to average 47.5 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Office of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HR-422 - GTN, Paperwork Reduction Project (1910-0400), U.S. Department of

246

Property:GreenButtonPlannedCompliant | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:GreenButtonPlannedCompliant Jump to: navigation, search Property Name GreenButtonPlannedCompliant Property Type Boolean Description Indicates if company is officially planning to be green button compliant. Pages using the property "GreenButtonPlannedCompliant" Showing 25 pages using this property. (previous 25) (next 25) A AEP Generating Company + true + Ameren Illinois Company (Illinois) + true + Appalachian Power Co + true + Atlantic City Electric Co + true + Austin Energy + true + B Baltimore Gas & Electric Co + true + Barton Village, Inc (Utility Company) + true + C Central Maine Power Co + true + Central Vermont Pub Serv Corp + true + City of Chattanooga, Georgia (Utility Company) + true +

247

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

DOE Green Energy (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

248

Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the Satsop-Aberdeen No. 2 230-kV Transmission Line PP&A Project No.: 1704 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective...are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: The Project is located in Gray's Harbor County, Washington between the towns of Aberdeen and Central Park, Washington. The Project is located in the following sections:

249

DOE Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Certifications and Professional Development Real Estate History DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration...

250

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt Discovery Replaces Precious Metals Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

251

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

252

Information Resources: LED Replacements for Linear Fluorescent Lamps  

NLE Websites -- All DOE Office Websites (Extended Search)

Replacements for Linear Fluorescent Lamps Webcast Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and fluorescent lamps were installed in a variety of recessed troffer luminaires for comparison in an office environment. The presentation concluded with a discussion of specifications listed in a newly updated technology fact sheet. View presentation slides View the text-alternative version View the webcast (WMV 16 MB) Download Windows Media Player

253

Milling Machine Replacement Project (4587), 5/11/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milling Machine Replacement Projects (4587) Milling Machine Replacement Projects (4587) Program or Field Office: Y-12 Site Office Location(s) (City/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: Submit by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital network communication (DNC) system. Categorical Exclusion(s) Applied: 81.31 -Installation or relocation of machinery and equipment For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation)

254

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt Discovery Replaces Precious Metals Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

255

Duct Chase Sprinkler Replacement Project (4594), 5/31/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duct Chase Sprinkler Replacement Project (4594) Duct Chase Sprinkler Replacement Project (4594) Program or Field Office: Y-12 Site Office Location(s) (Citv/County/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is provide replacement of corroded and aged sprinkler heads in the plenum duct chases. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of I 0 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D.

256

Public Invited to Comment on Draft Environmental Assessment for Replacement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Invited to Comment on Draft Environmental Assessment for Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site September 1, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

257

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

258

Sprinkler Head Replacement (4586), 4/24/2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sprinkler Head Replacement Projects (4586) Sprinkler Head Replacement Projects (4586) Program or Field Office: Y-12 Site Office Location(s) (Citv/Countv/State): Oak Ridge, Anderson County, Tennessee Proposed Action Description: The proposed action is to replace approximately 1 ,300 sprinkler heads upgrade fire protection systems. Categorical Exclusion(s) Applied: 81.3- Routine maintenance Submit by E-mail For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, including the full text of each categorical exclusion, see Subpart D of 10 CFR Part 1021. Regulatory Requirements in 10 CFR 1021.410(b): (See full text in regulation) [{Jrhe proposal fits within a class of actions that is listed in Appendix A orB to 10 CFR Part 1021, Subpart D. To fit within the classes of actions listed in 10 CFR Part 1021, Subpart D, Appendix B, a proposal must be one that would not: (1) threaten

259

Replacement of Data from IHS With Those from HPDI  

U.S. Energy Information Administration (EIA) Indexed Site

Replacement of Data from IHS With Those from HPDI Replacement of Data from IHS With Those from HPDI The EIA-914 estimation methodology published in September 2005 used data from IHS, Inc., as a source for calibration of historical monthly production data. As of August 2006, these data have been replaced with data from HPDI, LLC. EIA does not have access to both the full IHS and the HPDI data for an overlap period sufficiently long to allow comprehensive model estimation under both data sources and analysis of the effects on the model estimates of the change from IHS to HPDI. Comparisons of IHS and HPDI data series, however, reveal no evidence of any large or systematic differences between the raw IHS and HPDI estimates that serve as model inputs. Figure 1 illustrates the overall order of magnitude of the differences between

260

Cobalt discovery replaces precious metals as industrial catalyst  

NLE Websites -- All DOE Office Websites (Extended Search)

Cobalt discovery replaces precious metals Cobalt discovery replaces precious metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of industrial, synthetic, and

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

262

EIS-0350-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EIS-0350-S1: Mitigation Action Plan Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM This Mitigation Action Plan (MAP) describes mitigation and monitoring commitments for constructing and operating the Modified CMRR-NF. The commitments made in this MAP are designed to mitigate potentially adverse environmental consequences associated with the CMRR-NF Project as the CMRR-NF is constructed and operated, and as direct, indirect, and cumulative impacts from these actions occur over time. EIS-0350-S1-MAP-2011.pdf More Documents & Publications EIS-0350-S1: Final Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement

263

Quality assurance and standards plan for solar thermal technologies  

DOE Green Energy (OSTI)

The development of a Quality Assurance and Standards (QA and S) plan for the photovoltaic (PV) and domestic solar heating (SHAC) technologies preceded that for solar thermal technologies, permitting a review and lessons-learned approach to developing solar thermal QA and S plan. It is noted that the state of the art for solar thermal technology is not as complicated or novel as PV and is better suited to engineering dialogues for input and implementation than SHAC. It is important to recognize the differences in legislative directives that influence the US Department of Energy's approach to the process of developing a QA and S plan. Specific legislative directives to develop criteria for PV and SHAC are replaced for solar thermal with directives to develop standards using a commercial approach. Accordingly, a series of standards matrices are proposed as the keystone to the plan which will identify the functions of components, subsystems, and systems.

Cobb, H.R.W.

1981-07-01T23:59:59.000Z

264

Guide for Determining Motor Repair versus Motor Replacement  

Science Conference Proceedings (OSTI)

The Motor Replacement/Refurbishment Guide (MRRG) was written to aid with the determination on whether to repair an existing motor or to purchase a replacement motor. This guideline provides the basic tools necessary to make a determination based upon, but not limited to, the extent of the repair scope and the cost of the repair. This guideline presents a process to be utilized by the station or corporate motor specialist to assess the motor repair scope both initial and revised. The data gathering proces...

2005-12-23T23:59:59.000Z

265

Microsoft Word - CX-TroutdaleWindowReplacement_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Eric Weekley Project Manager - NWM-4 Proposed Action: Replace existing steel windows at the Troutdale Substation control house PP&A Project No.: PP&A-1699 Budget Information: Work Order No. 242796 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities and custodial services for buildings, structures, ... Location: Bonneville Power Administration's (BPA) Troutdale Substation located in Troutdale, Oregon Proposed by: BPA Description of the Proposed Action: BPA proposes to replace the deteriorating existing steel windows at the Troutdale Substation control house with new, in-kind steel windows.

266

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

267

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decommissioning Plan Review Module Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

268

New Planning Framework  

Science Conference Proceedings (OSTI)

This report describes an investigation into how various regulatory, economic, and technical changes are likely to affect the framework for transmission planning. It begins with an overview of the Existing Planning Framework, structured along the lines of five key aspects that encompass the purview, role, and responsibilities of transmission planning. The report then explores seven scenarios (future states) of transformative change in the electricity industryranging from the greater penetration of wind ge...

2010-12-22T23:59:59.000Z

269

JGI - Sequencing Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Sequencing Plans Sequencing Plans JGI engages users from the National Laboratory system, academic institutions, and private industry to perform sequencing projects that directly relate to the DOE Office of Biological and Environmental Research's missions in alternative energy, global carbon cycling, and bioremediation. JGI's sequencing portfolio is drawn from its user programs, including the Community Science Program and the new Bioenergy Research Centers, as well as targets chosen by DOE to meet programmatic objectives. Plans by Program and Year All projects GEBA Sequencing Plans Community Science Program FY2014 Community Sequencing Program FY2013 Community Sequencing Program FY2012 Community Sequencing Program FY2011 Community Sequencing Program FY2010 Community Sequencing Program FY2009

270

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

271

Cost Sensitive Conditional Planning  

E-Print Network (OSTI)

While POMDPs provide a general platform for conditional planning under a wide range of quality metrics they have limited scalability. On the other hand, uniform probability conditional planners scale very well, but many lack the ability to optimize plan quality metrics. We present an innovation to planning graph based heuristics that helps uniform probability conditional planners both scale and generate high quality plans when using actions with non uniform costs. We make empirical comparisons with two state of the art planners to show the benefit of our techniques.

Daniel Bryce; Subbarao Kambhampati

2005-01-01T23:59:59.000Z

272

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

273

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

274

Business Plan Competition Opportunities  

The Draper Fisher Jurvetson Venture Challenge is a West Coast business plan competition available to the colleges and universities across the West Coast that

275

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

276

Planning, Budget, and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

EERE Planning, Budget, and Analysis (Revised) Philip Patterson (Economist) and Jeff Dowd (Economist) DOE Hydrogen, Fuel Cells, and Infrastructure Technologies Program Systems...

277

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

278

Operations Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Strategic Plan Updated July 2009 Operations Organization Chief Operating Officer (COO) Deputy COO Environment, Health & Safety EH&S Facilities FAC Project Management...

279

Hoisting & Rigging Lift Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Authorized Personnel (attach more sheets if necessary) Printed name Signature Date SSRL Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005...

280

ORISE: Exercise Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the threat of a national security or...

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Reticulated centralizing apparatus  

Science Conference Proceedings (OSTI)

This patent describes a reticulated centralizing apparatus for a tubular to assist in centering the tubular in an annular space in a bore into which the tubular is inserted, comprising: two or more pairs of spaced apart and aligned collars adapted to encircle the tubular, spring bows extending between and secured to the collars each bow having two ends and an outwardly convex mid-portion, each pair of collars having emplaced therebetween only one collar of one of the other pair or pairs of collars.

Langer, F.H.

1989-01-03T23:59:59.000Z

282

Hanford Site Strategic Facilities Plan: Site planning  

SciTech Connect

This plan revises the Hanford Site Strategic Facilities Plan submitted by Westinghouse Hanford Company in 1988. It separates the Hanford Site facilities into two categories: ''strategically required'' facilities and ''marginal'' facilities. It provides a comparison of future facility requirements against existing capacities and proposed projects to eliminate or consolidate marginal facilities (i.e., those facilities that are not fully utilized or are no longer required to accomplish programmatic missions). The objective is to enhance the operating efficiency of the Hanford Site by maximizing facility use and minimizing unnecessary facility operating and maintenance costs. 11 refs.

1989-03-01T23:59:59.000Z

283

Economics of chlorofluorocarbon (CFC) machine replacement. Master's thesis  

Science Conference Proceedings (OSTI)

Continued use of chlorofluorocarbon (CFC) refrigerants may have a severe financial as well as operational impact on the users of air-conditioning and other refrigeration equipment as price increases continue and production is phased out. With production of CFC's coming to a halt on 31 December 1995, the two major refrigerants that have been used in commercial and industrial cooling applications will no longer be available. The phase out of production is a result of national and international agreement that these, as well as other CFC's, are a primary cause of the depletion of the stratospheric ozone layer. To help the user reduce this impact, an economic model based on the time value of money and utilizing replacement analysis was developed. The model is designed to require the user to supply information on his own equipment and on the projected costs of non-CFC replacement equipment. After running the model, the point in time when the existing equipment should be replaced is indicated. By way of example, the model is applied to a centrifugal chiller application. The results of this approach indicate that the increase in CFC costs is only a small factor in the cost of chiller operation. Rather than make a replacement to avoid the high price of refrigerant, the controlling factor is the overall cost of power consumption required to provide the cooling effect.

Rudderow, G.D.

1994-09-01T23:59:59.000Z

284

Single-molecule electron diffraction imaging with charge replacement  

E-Print Network (OSTI)

We investigate the possibility of non-destructive electron diffraction imaging of a single molecule to determine its structure. The molecular specimen will be held on a free-standing sheet of graphene. Due to the high conductivity of graphene, electrons lost by ionization would be rapidly replaced, enabling repeated nondestructive interrogation. Limits of resolution, maximum particle size and required electron flux are assessed.

Fill, E E; Raizen, M

2008-01-01T23:59:59.000Z

285

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

286

Selection and Implementation of a Replacement Cutting Tool Selection Application  

Science Conference Proceedings (OSTI)

A new commercial cutting tool software package replaced an internally created legacy system. This report describes the issues that surfaced during the migration and installation of the commercial package and the solutions employed. The primary issues discussed are restructuring the data between two drastically different database schemas and the creation of individual component graphics.

Rice, Gordon

2008-10-06T23:59:59.000Z

287

Transitions between town and metropolis : planning strategies for development and conservation of colonial Zacatecas  

E-Print Network (OSTI)

This thesis examines the planning strategies critical for the conservation and development of cities full of historic, traditional and cultural value. The colonial city of Zacatecas in central Mexico, was chosen for this ...

Lee Chibli, Jose Arturo

1996-01-01T23:59:59.000Z

288

Guidelines for strategic planning  

SciTech Connect

Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

1991-07-01T23:59:59.000Z

289

Long range Energy Alternatives Planning (LEAP) System | Open Energy  

Open Energy Info (EERE)

Long range Energy Alternatives Planning (LEAP) System Long range Energy Alternatives Planning (LEAP) System Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Long range Energy Alternatives Planning System Agency/Company /Organization: Stockholm Environment Institute Sector: Climate, Energy Focus Area: Non-renewable Energy, Agriculture, Biomass, - Anaerobic Digestion, - Biofuels, - Biomass Combustion, - Biomass Gasification, - Biomass Pyrolysis, - Landfill Gas, - Waste to Energy, Buildings, Economic Development, Energy Efficiency, - Central Plant, Food Supply, Forestry, Geothermal, Goods and Materials, - Embodied Energy, - Materials, Greenhouse Gas, Ground Source Heat Pumps, Hydrogen, Industry, - Industrial Processes, Offsets and Certificates, People and Policy, Solar, - Concentrating Solar Power, - Solar Hot Water, - Solar PV, - Solar Ventilation Preheat, Transportation, Water Conservation, Water Power, Wind

290

Long range Energy Alternatives Planning (LEAP) System | Open Energy  

Open Energy Info (EERE)

Long range Energy Alternatives Planning (LEAP) System Long range Energy Alternatives Planning (LEAP) System (Redirected from LEAP) Jump to: navigation, search Tool Summary Name: Long range Energy Alternatives Planning System Agency/Company /Organization: Stockholm Environment Institute Sector: Climate, Energy Focus Area: Non-renewable Energy, Agriculture, Biomass, - Anaerobic Digestion, - Biofuels, - Biomass Combustion, - Biomass Gasification, - Biomass Pyrolysis, - Landfill Gas, - Waste to Energy, Buildings, Economic Development, Energy Efficiency, - Central Plant, Food Supply, Forestry, Geothermal, Goods and Materials, - Embodied Energy, - Materials, Greenhouse Gas, Ground Source Heat Pumps, Hydrogen, Industry, - Industrial Processes, Offsets and Certificates, People and Policy, Solar, - Concentrating Solar Power, - Solar Hot Water, - Solar PV, - Solar Ventilation Preheat, Transportation, Water Conservation, Water Power, Wind

291

Environmental impacts during geothermal development: Some examples from Central America  

DOE Green Energy (OSTI)

The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development.

Goff, S.; Goff, F.

1997-04-01T23:59:59.000Z

292

A probabilistic plan recognition algorithm based on plan tree grammars  

Science Conference Proceedings (OSTI)

We present the PHATT algorithm for plan recognition. Unlike previous approaches to plan recognition, PHATT is based on a model of plan execution. We show that this clarifies several difficult issues in plan recognition including the execution of multiple ... Keywords: Action grammars, Bayesian methods, Goal recognition, Intent inference, Plan recognition, Probabilistic grammars, Task tracking

Christopher W. Geib; Robert P. Goldman

2009-07-01T23:59:59.000Z

293

Graphite technology development plan  

Science Conference Proceedings (OSTI)

This document presents the plan for the graphite technology development required to support the design of the 350 MW(t) Modular HTGR within the US National Gas-Cooled Reactor Program. Besides descriptions of the required technology development, cost estimates, and schedules, the plan also includes the associated design functions and design requirements.

NONE

1986-07-01T23:59:59.000Z

294

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

295

DISASTER PLAN Library Materials  

E-Print Network (OSTI)

New York: Neal-Schuman; 1992. Kahn, Miriam. Disaster Response and Prevention for Computer And DataDISASTER PLAN Library Materials For the University of Toronto Library System September 2013 disaster planning for archives, libraries and record centres. Second edition. Boston: Scarecrow Press, 2002

Sokolowski, Marla

296

Transportation Demand Management Plan  

E-Print Network (OSTI)

Transportation Demand Management Plan FALL 2009 #12;T r a n s p o r t a t i o n D e m a n d M a n the transportation impacts the expanded enrollment will have. Purpose and Goal The primary goal of the TDM plan is to ensure that adequate measures are undertaken and maintained to minimize the transportation impacts

297

Manufacturing research strategic plan  

SciTech Connect

This plan provides an overall strategic roadmap for the DOE-defense programs advanced manufacturing research program which supports the national science based stockpile stewardship program. This plan represents a vision required to develop the knowledge base needed to ensure an enduring national capability to rapidly and effectively manufacture nuclear weapons.

1995-11-01T23:59:59.000Z

298

Program Operations Plan  

SciTech Connect

The Department of Energy's Atmospheric Chemistry Program (ACP) was initiated in 1991 to coordinate DOE's university and federal-laboratory atmospheric-chemistry research, and to focus these efforts on national and international information requirements in the atmospheric-chemistry field. This Program Operations Plan describes the structure and vision of the effort designed to fulfill these needs, and is divided into two major components. The first of these is a Strategic Plan, which outlines the ACP's rationale, objectives, and vision, and describes its products that are anticipated over a future ten-year period. Although based on realistic appraisals of goals that are attainable given the financial, material, and intellectual resources of the ACP community, this Strategic Plan does not describe these resources themselves. The second component of the Program Operations Plan, the Implementation Plan, deals directly with these resource considerations. As such it focuses on practical implementation of Strategic-Plan elements at the individual research institutions, the anticipated scientific contributions of these groups, and their coordination within the ACP. In contrast to the Strategic Plan, this Implementation Plan extends only five years into the future.

1993-04-01T23:59:59.000Z

299

PROJECT PLANNING TEMPLATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

300

Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

302

Transportation Institutional Plan  

SciTech Connect

This Institutional Plan is divided into three chapters. Chapter 1 provides background information, discusses the purposes of the Plan and the policy guidance for establishing the transportation system, and describes the projected system and the plans for its integrated development. Chapter 2 discusses the major participants who must interact to build the system. Chapter 3 suggests mechanisms for interaction that will foster wide participation in program planning and implementation and provides a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. Also included in this Plan are four appendices. Of particular importance is Appendix A, which includes detailed discussion of specific transportation issues. Appendices B, C, and D provide supporting material to assist the reader in understanding the roles of the involved institutions.

1986-08-01T23:59:59.000Z

303

Planning & Campus Development  

E-Print Network (OSTI)

Campus Landscape History UNM Campus Heritage Survey Getty Campus Heritage Grant Project Landscape North Campus Map South Campus Map North & Central Oblique Aerial Photo North & Central Aerial South Campus Aerial Quick Picks Events & News Staff Directory Frequently Asked Questions (FAQs) Forms

Maccabe, Barney

304

Property:Plants with Unknown Planned Capacity | Open Energy Information  

Open Energy Info (EERE)

Plants with Unknown Planned Capacity Plants with Unknown Planned Capacity Jump to: navigation, search Property Name Plants with Unknown Planned Capacity Property Type String Description Number of plants with unknown planned capacity per GEA Pages using the property "Plants with Unknown Planned Capacity" Showing 21 pages using this property. A Alaska Geothermal Region + 1 + C Cascades Geothermal Region + 2 + Central Nevada Seismic Zone Geothermal Region + 9 + G Gulf of California Rift Zone Geothermal Region + 4 + H Hawaii Geothermal Region + 0 + Holocene Magmatic Geothermal Region + 0 + I Idaho Batholith Geothermal Region + 1 + N Northern Basin and Range Geothermal Region + 11 + Northern Rockies Geothermal Region + 0 + Northwest Basin and Range Geothermal Region + 9 + R Rio Grande Rift Geothermal Region + 1 +

305

Central solar energy receiver  

DOE Patents (OSTI)

An improved tower-mounted central solar energy receiver for heating air drawn through the receiver by an induced draft fan. A number of vertically oriented, energy absorbing, fin-shaped slats are radially arranged in a number of concentric cylindrical arrays on top of the tower coaxially surrounding a pipe having air holes through which the fan draws air which is heated by the slats which receive the solar radiation from a heliostat field. A number of vertically oriented and wedge-shaped columns are radially arranged in a number of concentric cylindrical clusters surrounding the slat arrays. The columns have two mirror-reflecting sides to reflect radiation into the slat arrays and one energy absorbing side to reduce reradiation and reflection from the slat arrays.

Drost, M. Kevin (Richland, WA)

1983-01-01T23:59:59.000Z

306

Central Internet Database (CID)  

Office of Environmental Management (EM)

CID Reports > Archived CID Reports > Archived Reports Central Internet Database CID Photo Banner Archived Reports The reports in the Archived Reports section of the CID are based on the FY 2001 EM Corporate Database (except the Buried TRU Report). The EM Corporate database stores information on radioactive waste, contaminated media, and spent nuclear fuel by identifying "streams" of material. A "stream" is defined as a group of materials, media, or waste having similar origins or management requirements. Radioactive waste, contaminated media, or spent nuclear fuel may be part of more than one "stream" from the time it is generated to the time it is permanently disposed, depending on the physical location or the management activity it is undergoing. The CID retains the "stream" concept as part of its data structure.

307

Strong planning under partial observability  

Science Conference Proceedings (OSTI)

Rarely planning domains are fully observable. For this reason, the ability to deal with partial observability is one of the most important challenges in planning. In this paper, we tackle the problem of strong planning under partial observability in ... Keywords: Binary decision diagrams, Heuristic search in belief space, Planning in nondeterministic domains, Planning under partial observability, Symbolic model checking

Piergiorgio Bertoli; Alessandro Cimatti; Marco Roveri; Paolo Traverso

2006-04-01T23:59:59.000Z

308

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

309

Reading Through a Plan: A Visual Theory of Plan Interpretation  

E-Print Network (OSTI)

Problem: Planners may read plans often, but the profession continues to view the interpretation of plan content as something that is either too obvious or too unimportant to require explicit discussion. Plans are seldom ...

Ryan, Brent D.

310

Timurid central Asia and Mughal India : some correlations regarding urban design concepts and the typology of the Muslim house  

E-Print Network (OSTI)

This thesis commences with the basic premise that Timurid Central Asia (which included the regions of Khorasan and Transoxania), with its monumental achievements in Urban Planning and Civic Architecture, beginning with the ...

Sobti, Manu P

1995-01-01T23:59:59.000Z

311

Dallas-Fort Worth, TX Clean Taxi Replacement Incentive  

Energy.gov (U.S. Department of Energy (DOE))

The North Central Texas Council of Governments has partnered with the U.S. Environmental Protection Agency and the City of Dallas to develop the North Texas Green & Go Clean Taxi Partnership as...

312

Experiment of Fundamental ECRH in the GAMMA 10 Central Cell  

Science Conference Proceedings (OSTI)

As an improvement of the central-cell ECRH (C-ECRH) system in GAMMA 10, an ellipsoidal mirror was installed instead of a cylindrical mirror. With this replacement, the microwave beam for ECRH is converged to the GAMMA 10 axis on the resonance surface and Poynting flux reaching the plasma core region becomes about five times larger than the previous one. Effectiveness of this system has been shown in the initial stage of experiment. Finite increment of soft X-ray signal during ECRH operation indicates an increase of the electron temperature. As more improvement, designing a new antenna is now under way.

Tatematsu, Y. [Plasma Research Center, University of Tsukuba (Japan); Saito, T. [Plasma Research Center, University of Tsukuba (Japan); Ikegami, H. [Plasma Research Center, University of Tsukuba (Japan); Sekine, T. [Plasma Research Center, University of Tsukuba (Japan); Nagai, D. [Plasma Research Center, University of Tsukuba (Japan); Nozaki, K. [Plasma Research Center, University of Tsukuba (Japan); Ishii, K. [Plasma Research Center, University of Tsukuba (Japan); Kohagura, J. [Plasma Research Center, University of Tsukuba (Japan); Nakashima, Y. [Plasma Research Center, University of Tsukuba (Japan); Kubo, S. [National Institute for Fusion Science (Japan); Shimozuma, T. [National Institute for Fusion Science (Japan); Cho, T. [Plasma Research Center, University of Tsukuba (Japan)

2005-01-15T23:59:59.000Z

313

EMSL Strategic Plan 2008  

SciTech Connect

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

314

EMSL Contribution Plan  

Science Conference Proceedings (OSTI)

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

315

Microsoft Word - Roza_Transformer_Replacement_CX_Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clearance Memorandum Clearance Memorandum Patricia Smith Project Manager KEWU-4 Proposed Action: Replace two broken transformers near the Roza Dam adult trap facility Budget Information: Work Order #188534, Task #1 Fish and Wildlife Project No.: 1997-013-25 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: Roza Diversion Dam Adult Trap Facility , Township 15 North, Range 19 East,

316

Microsoft Word - CX-Coulee_Westside_Relay_Replacement_130205.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Roy Slocum Project Manager - TEP-CSB-2 Proposed Action: Coulee-Westside Transfer Trip Replacement Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment Locations: Grand Coulee, WA and Spokane, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The BPA has entered into a three-party agreement with Bureau of Reclamation (Bureau) and Avista Corporation (Avista) to coordinate the replacement of relays and removal of transfer trip equipment at Avista's Westside Substation and the Bureau's Grand Coulee Switchyard on the Grand Coulee-Westside 230-kilovolt (kV) Transmission Line. Under this agreement, BPA proposes to:

317

L Prize Competition Winner 60W Incandesent Replacement Lamp Update  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Deployment Technology Deployment Working Group L Prize ® Competition Winner 60W Incandescent Replacement Lamp Update James E. Rannels, Senior Advisor L Prize Competition D&R International May 23, 2012 Philips Wins First L Prize 2 * August 3, 2011: Philips announced as winner of 60W replacement bulb category * Product distributed thru commercial and retail channels Image courtesy of Philips -...[O]nce an award is made the authorizing Act directs General Services Administration to develop federal purchasing schedules for solid-state lamps that meet or exceed the specifications laid out in the prize category-so long as it is cost effective. I hope the GSA begins this process soon.‖

318

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

319

Repair and Replacement Applications Center Joint Welding Procedure Qualification Program  

Science Conference Proceedings (OSTI)

At the request of the EPRI Repair and Replacement Applications Center subscribers, a Joint Welding Procedure Qualification Program was developed to provide a medium whereby multiple utilities can share in the qualification of specific welding procedures. The program was developed in such a manner that it will supplement existing utility welding qualification programs. Specifically the program incorporates the more stringent attributes of each utility's internal welding program while meeting the individua...

1997-11-12T23:59:59.000Z

320

Polypeptide having an amino acid replaced with N-benzylglycine  

DOE Patents (OSTI)

The present invention relates to one or more polypeptides having useful biological activity in a mammal, which comprise: a polypeptide related to bradykinin of four to ten amino acid residues wherein one or more specific amino acids in the polypeptide chain are replaced with achiral N-benzylglycine. These polypeptide analogues have useful potent agonist or antagonist pharmacological properties depending upon the structure. A preferred polypeptide is (N-benzylglycine.sup.7)-bradykinin.

Mitchell, Alexander R. (Livermore, CA); Young, Janis D. (Los Angeles, CA)

1996-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement  

SciTech Connect

This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

Springer, D.; Dakin, B.

2013-03-01T23:59:59.000Z

322

Remote telerobotic replacement for master-slave manipulator  

SciTech Connect

A remotely replaceable telerobotic manipulator (TRM) has been developed and deployed at the Defense Waste Processing Facility (DWPF) in support of its radioactive operation. The TRM replaces a Master-Slave Manipulator (MSM). The TRM is in use for both routine and recovery operations for the radioactive waste vitrification melter, the primary production device within the DWPF. The arm was designed for deployment and operation using an existing MSM penetration. This replacement of an existing MSM with a high power robotic device demonstrates the capability to perform similar replacement in other operating facilities. The MSM`s were originally deployed in the DWPF to perform routine light capacity tasks. During the testing phase of the DWPF, prior to its radioactive startup in 5/96, the need to remove glass deposits that can form at the melter discharge during filling of glass containment canisters was identified. The combination of high radiation and contamination in the DWPF melter cell during radioactive operation eliminated personnel entry as a recovery option. Therefore remote cleaning methods had to be devised. The MSM`s had neither the reach nor the strength required for this task. It became apparent that a robust manipulator arm would be required for recovery from these potential melter discharge pluggage events. The existing wall penetrations, used for the MSM`s, could not be altered for seismic and radiological reasons. The new manipulator was required to be of considerable reach, due to existing physical layout, and strength, due to the glass removal requirement. Additionally, the device would have to compatible with high radiation and remote crane installation. The physical size of the manipulator and the weight of components must be consistent with the existing facilities. It was recognized early-on that a manipulator of sufficient strength to recover from a pluggage event would require robotic functions to constrain undesirable motions.

Heckendorn, F.M.; Iverson, D.C. [Westinghouse Savannah River Company, Aiken, SC (United States); LaValle, D.R. [PaR Systems Inc., Shorview, MN (United States)

1997-05-01T23:59:59.000Z

323

Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994  

SciTech Connect

This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

Fisk, E.L.

1994-06-01T23:59:59.000Z

324

SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools  

E-Print Network (OSTI)

to a maximum of about 2,000 ft (610 m) in much of northern Washington and 3,500 ft (1,067 m) in central OregonSOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools #12;SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT A-1 Interactive

325

DRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools  

E-Print Network (OSTI)

Washington and 3,500 ft (1,067 m) in central Oregon. Soils and geology are very diverse. Topography rangesDRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT 208 Appendix A: Assessment Tools #12;DRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT A-1

326

A fuzzy mixed integer goal programming approach for cooking and heating energy planning in rural India  

Science Conference Proceedings (OSTI)

In this study, a fuzzy mixed integer goal programming model (FMIGP) has been developed for rural cooking and heating energy planning in the Chikhli taluka of Buldhana district, Maharashtra, Central India. The model considers various scenarios such as ... Keywords: Energy planning, Fuzzy goal programming, Fuzzy sets

A. M. Jinturkar; S. S. Deshmukh

2011-09-01T23:59:59.000Z

327

Central and Eastern United States (CEUS) Seismic Source Characterization (SSC) for Nuclear Facilities Project  

SciTech Connect

This report describes a new seismic source characterization (SSC) model for the Central and Eastern United States (CEUS). It will replace the Seismic Hazard Methodology for the Central and Eastern United States, EPRI Report NP-4726 (July 1986) and the Seismic Hazard Characterization of 69 Nuclear Plant Sites East of the Rocky Mountains, Lawrence Livermore National Laboratory Model, (Bernreuter et al., 1989). The objective of the CEUS SSC Project is to develop a new seismic source model for the CEUS using a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 assessment process. The goal of the SSHAC process is to represent the center, body, and range of technically defensible interpretations of the available data, models, and methods. Input to a probabilistic seismic hazard analysis (PSHA) consists of both seismic source characterization and ground motion characterization. These two components are used to calculate probabilistic hazard results (or seismic hazard curves) at a particular site. This report provides a new seismic source model. Results and Findings The product of this report is a regional CEUS SSC model. This model includes consideration of an updated database, full assessment and incorporation of uncertainties, and the range of diverse technical interpretations from the larger technical community. The SSC model will be widely applicable to the entire CEUS, so this project uses a ground motion model that includes generic variations to allow for a range of representative site conditions (deep soil, shallow soil, hard rock). Hazard and sensitivity calculations were conducted at seven test sites representative of different CEUS hazard environments. Challenges and Objectives The regional CEUS SSC model will be of value to readers who are involved in PSHA work, and who wish to use an updated SSC model. This model is based on a comprehensive and traceable process, in accordance with SSHAC guidelines in NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts. The model will be used to assess the present-day composite distribution for seismic sources along with their characterization in the CEUS and uncertainty. In addition, this model is in a form suitable for use in PSHA evaluations for regulatory activities, such as Early Site Permit (ESPs) and Combined Operating License Applications (COLAs). Applications, Values, and Use Development of a regional CEUS seismic source model will provide value to those who (1) have submitted an ESP or COLA for Nuclear Regulatory Commission (NRC) review before 2011; (2) will submit an ESP or COLA for NRC review after 2011; (3) must respond to safety issues resulting from NRC Generic Issue 199 (GI-199) for existing plants and (4) will prepare PSHAs to meet design and periodic review requirements for current and future nuclear facilities. This work replaces a previous study performed approximately 25 years ago. Since that study was completed, substantial work has been done to improve the understanding of seismic sources and their characterization in the CEUS. Thus, a new regional SSC model provides a consistent, stable basis for computing PSHA for a future time span. Use of a new SSC model reduces the risk of delays in new plant licensing due to more conservative interpretations in the existing and future literature. Perspective The purpose of this study, jointly sponsored by EPRI, the U.S. Department of Energy (DOE), and the NRC was to develop a new CEUS SSC model. The team assembled to accomplish this purpose was composed of distinguished subject matter experts from industry, government, and academia. The resulting model is unique, and because this project has solicited input from the present-day larger technical community, it is not likely that there will be a need for significant revision for a number of years. See also Sponsors Perspective for more details. The goal of this project was to implement the CEUS SSC work plan for developing a regional CEUS SSC model. The work plan, formulated by the project manager and a

Kevin J. Coppersmith; Lawrence A. Salomone; Chris W. Fuller; Laura L. Glaser; Kathryn L. Hanson; Ross D. Hartleb; William R. Lettis; Scott C. Lindvall; Stephen M. McDuffie; Robin K. McGuire; Gerry L. Stirewalt; Gabriel R. Toro; Robert R. Youngs; David L. Slayter; Serkan B. Bozkurt; Randolph J. Cumbest; Valentina Montaldo Falero; Roseanne C. Perman' Allison M. Shumway; Frank H. Syms; Martitia (Tish) P. Tuttle

2012-01-31T23:59:59.000Z

328

Central and Eastern United States (CEUS) Seismic Source Characterization (SSC) for Nuclear Facilities Project  

Science Conference Proceedings (OSTI)

This report describes a new seismic source characterization (SSC) model for the Central and Eastern United States (CEUS). It will replace the Seismic Hazard Methodology for the Central and Eastern United States, EPRI Report NP-4726 (July 1986) and the Seismic Hazard Characterization of 69 Nuclear Plant Sites East of the Rocky Mountains, Lawrence Livermore National Laboratory Model, (Bernreuter et al., 1989). The objective of the CEUS SSC Project is to develop a new seismic source model for the CEUS using a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 assessment process. The goal of the SSHAC process is to represent the center, body, and range of technically defensible interpretations of the available data, models, and methods. Input to a probabilistic seismic hazard analysis (PSHA) consists of both seismic source characterization and ground motion characterization. These two components are used to calculate probabilistic hazard results (or seismic hazard curves) at a particular site. This report provides a new seismic source model. Results and Findings The product of this report is a regional CEUS SSC model. This model includes consideration of an updated database, full assessment and incorporation of uncertainties, and the range of diverse technical interpretations from the larger technical community. The SSC model will be widely applicable to the entire CEUS, so this project uses a ground motion model that includes generic variations to allow for a range of representative site conditions (deep soil, shallow soil, hard rock). Hazard and sensitivity calculations were conducted at seven test sites representative of different CEUS hazard environments. Challenges and Objectives The regional CEUS SSC model will be of value to readers who are involved in PSHA work, and who wish to use an updated SSC model. This model is based on a comprehensive and traceable process, in accordance with SSHAC guidelines in NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts. The model will be used to assess the present-day composite distribution for seismic sources along with their characterization in the CEUS and uncertainty. In addition, this model is in a form suitable for use in PSHA evaluations for regulatory activities, such as Early Site Permit (ESPs) and Combined Operating License Applications (COLAs). Applications, Values, and Use Development of a regional CEUS seismic source model will provide value to those who (1) have submitted an ESP or COLA for Nuclear Regulatory Commission (NRC) review before 2011; (2) will submit an ESP or COLA for NRC review after 2011; (3) must respond to safety issues resulting from NRC Generic Issue 199 (GI-199) for existing plants and (4) will prepare PSHAs to meet design and periodic review requirements for current and future nuclear facilities. This work replaces a previous study performed approximately 25 years ago. Since that study was completed, substantial work has been done to improve the understanding of seismic sources and their characterization in the CEUS. Thus, a new regional SSC model provides a consistent, stable basis for computing PSHA for a future time span. Use of a new SSC model reduces the risk of delays in new plant licensing due to more conservative interpretations in the existing and future literature. Perspective The purpose of this study, jointly sponsored by EPRI, the U.S. Department of Energy (DOE), and the NRC was to develop a new CEUS SSC model. The team assembled to accomplish this purpose was composed of distinguished subject matter experts from industry, government, and academia. The resulting model is unique, and because this project has solicited input from the present-day larger technical community, it is not likely that there will be a need for significant revision for a number of years. See also Sponsors Perspective for more details. The goal of this project was to implement the CEUS SSC work plan for developing a regional CEUS SSC model. The work plan, formulated by the project manager and a

Kevin J. Coppersmith; Lawrence A. Salomone; Chris W. Fuller; Laura L. Glaser; Kathryn L. Hanson; Ross D. Hartleb; William R. Lettis; Scott C. Lindvall; Stephen M. McDuffie; Robin K. McGuire; Gerry L. Stirewalt; Gabriel R. Toro; Robert R. Youngs; David L. Slayter; Serkan B. Bozkurt; Randolph J. Cumbest; Valentina Montaldo Falero; Roseanne C. Perman' Allison M. Shumway; Frank H. Syms; Martitia (Tish) P. Tuttle

2012-01-31T23:59:59.000Z

329

Plan recognition in exploratory domains  

Science Conference Proceedings (OSTI)

This paper describes a challenging plan recognition problem that arises in environments in which agents engage widely in exploratory behavior, and presents new algorithms for effective plan recognition in such settings. In exploratory domains, agents@? ... Keywords: Plan recognition, User modeling

Yaakov Gal; Swapna Reddy; Stuart M. Shieber; Andee Rubin; Barbara J. Grosz

2012-01-01T23:59:59.000Z

330

Document Central | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

of Operations Manual APS QA Plan (obsolescence memo) APS Publications: APS Database APS Technical Publications Light Source Notes Technical Bulletins Safety Committee...

331

DRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT F-39 Sage Thrasher  

E-Print Network (OSTI)

.5 - 4.0 ac) in south central Idaho (Reynolds and Rich 1978). #12;DRAFT SOUTHEAST WASHINGTON SUBBASIN Oregon. The reported territory size in central Washington is much lower, 0.1 ha (0.2 ac) (Rotenberry etDRAFT SOUTHEAST WASHINGTON SUBBASIN PLANNING ECOREGION WILDLIFE ASSESSMENT F-39 Sage Thrasher

332

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

333

Central Internet Database (CID) Home  

Office of Environmental Management (EM)

Banner Welcome to the updated Central Internet Database (CID) The CID is a gateway to waste management and facility information from current and archived Department of Energy...

334

Central Appalachian Coal Futures Overview  

U.S. Energy Information Administration (EIA)

Central Appalachian Coal Futures Overview In 1996, the New York Mercantile Exchange (NYMEX) began providing companies in the electric power industry with secure and ...

335

Central Alabama Electric Cooperative - Residential Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Central Alabama Electric Cooperative - Residential Energy Efficiency Rebate Program Central Alabama Electric Cooperative - Residential Energy Efficiency Rebate Program Eligibility...

336

DOE Retro Analysis Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro Analysis Plan Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for Retrospective Analysis of Existing Rules. We are encouraged by DOE's efforts to implement Executive Order 13563. We appreciate the actions already taken by DOE to address our concerns regarding the Final Rule on Certification, Compliance, and Enforcement Regulations for Consumer Products and Commercial and

337

Plan Your School Visit  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Your School Visit Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit Chaperones To ensure that your students have the best possible experience at the Museum, we ask that you provide one chaperone for every 6 children. The chaperones should stay with their assigned group of students throughout the entire visit and model positive behavior. General Before arriving at the Museum, please remind your students about the following guidelines: If possible, leave food and drinks on the bus. Respect other visitors in the Museum by using inside voices, walking, etc. Please be gentle with the exhibits. Cameras are welcome at the Bradbury Science Museum. Have fun! Upon your arrival

338

Milestone Plan Process Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues...

339

Policy & Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

340

Climate Action Plan (Maine)  

Energy.gov (U.S. Department of Energy (DOE))

In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan with the goal of reducing greenhouse gas (GHG)...

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

LFRG Program Management Plan  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes,...

342

Environmental Monitoring Plan  

Science Conference Proceedings (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

343

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States...

344

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the...

345

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

346

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

347

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

348

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

349

Climate Action Plan (Delaware)  

Energy.gov (U.S. Department of Energy (DOE))

The Delaware Climate Change Action Plan (DCCAP) was prepared with funding from the Delaware State Energy Office and the U.S. Environmental Protection Agencys State and Local Climate Change Program...

350

Climate Action Plan (Maryland)  

Energy.gov (U.S. Department of Energy (DOE))

On April 20, 2007, Governor Martin OMalley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to...

351

EMSL 2006 Strategic Plan  

SciTech Connect

The 2006 EMSL Strategic Plan describes the elements of EMSLs 5-year strategy to provide outstanding value to its user community and to meet evolving goals of the DOE Office of Biological Research.

Campbell, Allison A.

2005-12-21T23:59:59.000Z

352

Environmental Management System Plan  

E-Print Network (OSTI)

3) environmental management programs, (4) training, (5)Management Programs3-5 Structure and Responsibility.3-6 Training,Management System Plan Program Elements Additional information regarding EMS training

Fox, Robert

2009-01-01T23:59:59.000Z

353

Milestone Plan Process Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

354

Regional hydrothermal commercialization plan  

SciTech Connect

This plan for the Rocky Mountain Basin and Range Region articulates the complete range of initiatives (federal, state, local, and industrial) required for the early commercialization of the regions geothermal resources. (MHR)

1978-07-14T23:59:59.000Z

355

Hiring Reform Memoranda and Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0585 0585 October 7, 2010 MEMORANDUM FOR HEADS OF ALL DEPARTMENTAL ELEMEI\lTS HUMAI\l RESOURCES DIRECTORS FROM: MICHAELC. KANE~~~ CHIEF HUMAN CAPITAL ~ c· SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a follow-up to the Deputy Secretary's Memorandum dated October 6, 2010 where he communicated the need to implement the Action Plan developed to improve the recruitment and hiring processes throughout the Department. One of the central tenets of the President's reform efforts and the Department's Action Plan is management's commitment and attention to an efficient and effective hiring process that yields quality employees. This was clearly articulated in the President's Memorandum dated May 11, 2010 where he directed that management be held accountable through the performance evaluation system for their role

356

Tonopah Test Range closure sites revegetation plan  

SciTech Connect

This document is a revegetation plan for long-term stabilization (revegetation) of land disturbed by activities associated with the closure of a Bomblet Pit and the Five Points Landfill. Both sites are on the Tonopah Test Range (TTR) located in south-central Nevada. This document contains general reclamation practices and procedures that will be followed during the revegetation of these sites. The revegetation procedures proposed have been developed over several years of research and include the results of reclamation trials at Area 11 and Area 19 on the Nevada Test Site (NTS), and more recently at the Double Tracks (Nellis Air Force Range) reclamation demonstration plots. In addition, the results of reclamation efforts and concurrent research efforts at the Yucca Mountain Project have been considered in the preparation of this revegetation plan.

Anderson, D.C.; Hall, D.B.

1997-05-01T23:59:59.000Z

357

WIPP - Passive Institutional Controls (PICs) Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans Files below are in PDF format and can be viewed with Adobe Acrobat Reader. PICs Implementation Plan Permanent Markers Implementation Plan Permanent Markers Testing Plan...

358

Annual Training Plan Template | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Template Annual Training Plan Template The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan. The...

359

Building Technologies Office: Strategic Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans to Strategic Plans to someone by E-mail Share Building Technologies Office: Strategic Plans on Facebook Tweet about Building Technologies Office: Strategic Plans on Twitter Bookmark Building Technologies Office: Strategic Plans on Google Bookmark Building Technologies Office: Strategic Plans on Delicious Rank Building Technologies Office: Strategic Plans on Digg Find More places to share Building Technologies Office: Strategic Plans on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home

360

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Management (IPPM) Head Program Administrator Planning Coordination Performance Analysis Chief Operating Officer Risk Analysis Lab PlanningGoal Setting Process ...

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Geothermal Technologies Program Strategic Plan  

SciTech Connect

This DOE/EERE program strategic plan builds upon previous program plans and R&D direction reviews with industry representatives and other stakeholders.

2004-08-01T23:59:59.000Z

362

2011-2020 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE))

LM has completed its 2011-2020 Strategic Plan. The new plan provides our organization with clear directions for the future.

363

Emergency Action Plan (EAP) Template  

NLE Websites -- All DOE Office Websites (Extended Search)

00q09e011.doc i (042013) Local Emergency Plan BUILDING: COMPLEX: ZONE: PLAN APPROVAL DATE: Approved by Name Signature Date Local Emergency Coordinator John Cintorino Facility...

364

Community Greening: How To Develop A Strategic Energy Plan, Energy Efficiency & Renewable Energy (EERE) (Brochure)  

NLE Websites -- All DOE Office Websites (Extended Search)

COMMUNITY GREENING: COMMUNITY GREENING: HOW TO DEVELOP A STRATEGIC ENERGY PLAN When should strategic energy planning begin? Planning usually begins as a reaction to increasing prices, the potential for large investments in infrastructure development, or a political change. Therefore, it can begin at any time. Sometimes, planning is a reaction to a natural disaster that allows for extensive redevelopment. This topic is specifically covered in an associated publication, "From Tragedy to Triumph-Rebuilding Green Homes after Disaster." Ideally, the community would have a plan in place before disaster strikes, but that is rarely the case. Because a strategic energy plan can help inform decisions on infrastructure repair and replacement, and lead to the development

365

Site Sustainability Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

366

WESTERN UNIVERSITY Disaster Plan  

E-Print Network (OSTI)

.7 Assumptions 1.7.1 Emergency 1.7.2 Disaster 1.8 Concept of Operations 1.8.1 Background 1.8.2 Emergency Response/Administrative Unit Responsibilities 1.8.8 Situation Reports 2. UTILIZING THE DISASTER PLAN 2.1 Emergency Process Members ­ Individual Responsibilities #12;WESTERN UNIVERSITY Disaster Plan January, 2013 2.7.1 VP

Sinnamon, Gordon J.

367

Environmental protection Implementation Plan  

SciTech Connect

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

368

Energy Efficiency Planning Guidebook  

Science Conference Proceedings (OSTI)

Demand planning is an essential undertaking for utilities looking to understand and quantify the dispatchable resources associated with energy efficiency and demand response programs. Further, demand planning enables a utility to select the most appropriate, cost-effective suite of energy efficiency technologies, demand response technologies, and program delivery mechanisms for its unique market and operating conditions as well as the optimal level of investment. This guidebook reviews and explains a com...

2008-07-07T23:59:59.000Z

369

Institutional Plan, FY 1995--2000  

SciTech Connect

Sandia recently completed an updated strategic plan, the essence of which is presented in chapter 4. Sandia`s Strategic Plan 1994 takes its direction from DOE`s Fueling a Competitive Economy: Strategic Plan and provides tangible guidance for Sandia`s programs and operations. Although it is impossible to foresee precisely what activities Sandia will pursue many years from now, the strategic plan makes one point clear: the application of our scientific and engineering skills to the stewardship of the nation`s nuclear deterrent will be central to our service to the nation. We will provide the necessary institutional memory and continuity, experience base, and technical expertise to ensure the continued safety, security, and reliability of the nuclear weapons stockpile. As a multiprogram laboratory, Sandia will also continue to focus maximum effort on a broad spectrum of other topics consistent with DOE`s enduring core mission responsibilities: Defense (related to nuclear weapons), Energy, Environment (related to waste management and environmental remediation), and Basic Science.

1994-10-01T23:59:59.000Z

370

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

371

International Photovoltaic Program Plan  

SciTech Connect

The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

372

International Photovoltaic Program Plan  

DOE Green Energy (OSTI)

The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

373

Replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory  

Science Conference Proceedings (OSTI)

The DOE-Idaho Operations Office (DOE-ID) has prepared an environmental assessment (EA) on the replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory at the Idaho National Engineering Laboratory (INEL). The purpose of this project is to replace the existing Health Physics Instrumentation Laboratory (HPIL) with a new facility to provide a safe environment for maintaining and calibrating radiation detection instruments used at the Idaho National Engineering Laboratory. The existing HPIL facility provides portable health physics monitoring instrumentation and direct reading dosimetry procurement, maintenance and calibration of radiation detection instruments, and research and development support-services to the INEL and others. However, the existing facility was not originally designed for laboratory activities and does not provide an adequate, safe environment for calibration activities. The EA examined the potential environmental impacts of the proposed action and evaluated reasonable alternatives, including the no action alternative in accordance with the Council on Environmental Quality (CEQ) Regulations (40 CFR Parts 1500-1508). Based on the environmental analysis in the attached EA, the proposed action will not have a significant effect on the human environment within the meaning of the National Environmental Policy Act (NEPA) and 40 CFR Parts 1508.18 and 1508.27. The selected action (the proposed alternative) is composed of the following elements, each described or evaluated in the attached EA on the pages referenced. The proposed action is expected to begin in 1997 and will be completed within three years: design and construction of a new facility at the Central Facility Area of the INEL; operation of the facility, including instrument receipt, inspections and repairs, precision testing and calibration, and storage and issuance. The selected action will result in no significant environmental impacts.

NONE

1995-05-01T23:59:59.000Z

374

IT Capital Planning Corporate Management Improvement Program (CMIP) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the end of their life cycles. An investment to replace and modernize severely outdated information technology (IT) systems would prove a much more efficient expenditure of scarce IT dollars than the continued enhancement, maintenance, and operation of legacy systems. CMIP is an initiative to modernize and improve software applications, hardware, and infrastructure which support a wide range of Department-wide IT based business systems. CMIP permits the

375

Long-term Energy Plan (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-term Energy Plan (Ontario, Canada) Long-term Energy Plan (Ontario, Canada) Long-term Energy Plan (Ontario, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 2007 State Ontario Program Type Climate Policies Industry Recruitment/Support Renewables Portfolio Standards and Goals Provider Ontario Ministry of Energy Currently, Ontario's electricity system has a capacity of approximately 35,000 MW of power. The Ontario Power Authority forecasts that more than 15,000 MW will need to be renewed, replaced or added by 2030.

376

First Nations Community Planning Model [EDRA / Places Awards, 2003 -- Planning  

E-Print Network (OSTI)

EDRA/Places planning awards should principally recognizeoutcomes. But others felt the awards should also recognize

Moffat, David

2004-01-01T23:59:59.000Z

377

Evaluation of In Situ Grouting as a Potential Remediation Method for the Hanford Central Plateau Deep Vadose Zone  

SciTech Connect

The Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau report identifies in situ grouting as a potential remediation technology for the deep vadose zone and includes a planned effort to evaluate in situ grouting to provide information for future feasibility studies. This report represents the first step in this evaluation effort.

Truex, Michael J.; Pierce, Eric M.; Nimmons, Michael J.; Mattigod, Shas V.

2011-01-11T23:59:59.000Z

378

Survey of Western U.S. Electric Utility Resource Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Survey of Western U.S. Electric Utility Resource Plans Survey of Western U.S. Electric Utility Resource Plans Title Survey of Western U.S. Electric Utility Resource Plans Publication Type Journal Article Year of Publication 2014 Authors Wilkerson, Jordan, Peter H. Larsen, and Galen L. Barbose Journal Energy Policy Date Published 2014 Abstract We review long-term electric utility plans representing "' 90% of generation within the Western U.S. and Canadian provinces. We address what utility planners assume about future growth of electricity demand and supply; what types of risk they consider in their long-term resource planning; and the consistency in which they report resource planning-related data. The region is anticipated to grow by 2% annually by 2020 before Demand Side Management. About two-thirds of the utilities that provided an annual energy forecast also reported energy efficiency savings projections; in aggregate, they anticipate an average 6.4% reduction in energy and 8.6% reduction in peak demand by 2020. New natural gas-fired and renewable generation will replace retiring coal plants. Although some utilities anticipate new coal-fired plants, most are planning for steady growth in renewable generation over the next two decades. Most planned solar capacity will come online before 2020, with most wind expansion after 2020. Fuel mix is expected to remain "' 55% of total generation. Planners consider a wide range of risks but focus on future demand, fuel prices, and the possibility of GHG regulations. Data collection and reporting inconsistencies within and across electric utility resource plans lead to recommendations on policies to address this issue.

379

Central America | OpenEI  

Open Energy Info (EERE)

Central America Central America Dataset Summary Description (Abstract): 50 m wind power density (W/m2) maps of Central America. (Purpose): To provide information on the wind resource potential within the following countries in Central America: Belize, El Salvador, Guatemala, Honduras, and Nicaragua. Source NREL Date Released June 30th, 2004 (10 years ago) Date Updated October 30th, 2007 (7 years ago) Keywords Central America GIS maps NREL SWERA UNEP wind Data application/zip icon Download Maps (zip, 2.2 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period 2004 License License Open Data Commons Public Domain Dedication and Licence (PDDL) Comment Rate this dataset Usefulness of the metadata Average vote Your vote Usefulness of the dataset

380

Generalizing GraphPlan by Formulating Planning as a CSP  

E-Print Network (OSTI)

We examine the approach of encoding planning problems as CSPs more closely. First we present a simple CSP encoding for planning problems and then a set of transformations that can be used to eliminate variables and add new constraints to the encoding. We show that our transformations uncover additional structure in the planning problem, structure that subsumes the structure uncovered by GRAPHPLAN planning graphs. We solve the CSP encoded planning problem by using standard CSP algorithms. Empirical evidence is presented to validate the effectiveness of this approach to solving planning problems, and to show that even a prototype implementation is more effective than standard GRAPHPLAN. Our prototype is even competitive with far more optimized planning graph based implementations. We also demonstrate that this approach can be more easily lifted to more complex types of planning than can planning graphs. In particular, we show that the approach can be easily extended to planning with resources.

Adriana Lopez; Fahiem Bacchus

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental Planning and Resource Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

FinalReport Glen Canyon Dam ROD & Operating Constraints Glen Canyon Operations White Paper Grand Canyon Protection Act of 1992 Replacement Resources & Methods Report...

382

El Salvador-Low-Carbon Energy for Central America: Building a Regional  

Open Energy Info (EERE)

El Salvador-Low-Carbon Energy for Central America: Building a Regional El Salvador-Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name El Salvador-Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country El Salvador Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for Central America through the use of renewable energy and energy efficiency maps, followed by technical, economic, and social feasibility studies for

383

Nicaragua-Low-Carbon Energy for Central America: Building a Regional Model  

Open Energy Info (EERE)

Nicaragua-Low-Carbon Energy for Central America: Building a Regional Model Nicaragua-Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name Nicaragua-Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country Nicaragua Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for Central America through the use of renewable energy and energy efficiency maps, followed by technical, economic, and social feasibility studies for

384

Honduras-Low-Carbon Energy for Central America: Building a Regional Model |  

Open Energy Info (EERE)

Honduras-Low-Carbon Energy for Central America: Building a Regional Model Honduras-Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name Honduras-Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country Honduras Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for Central America through the use of renewable energy and energy efficiency maps, followed by technical, economic, and social feasibility studies for

385

Belize-Low-Carbon Energy for Central America: Building a Regional Model |  

Open Energy Info (EERE)

Belize-Low-Carbon Energy for Central America: Building a Regional Model Belize-Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name Belize-Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country Belize Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for Central America through the use of renewable energy and energy efficiency maps, followed by technical, economic, and social feasibility studies for

386

Costa Rica-Low-Carbon Energy for Central America: Building a Regional Model  

Open Energy Info (EERE)

Costa Rica-Low-Carbon Energy for Central America: Building a Regional Model Costa Rica-Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name Costa-Rica-Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country Costa Rica Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for Central America through the use of renewable energy and energy efficiency maps, followed by technical, economic, and social feasibility studies for

387

Guatemala-Low-Carbon Energy for Central America: Building a Regional Model  

Open Energy Info (EERE)

Guatemala-Low-Carbon Energy for Central America: Building a Regional Model Guatemala-Low-Carbon Energy for Central America: Building a Regional Model Jump to: navigation, search Name Guatemala-Low-Carbon Energy for Central America: Building a Regional Model Agency/Company /Organization World Watch Institute Sector Energy Focus Area Renewable Energy Topics Background analysis, Implementation, Low emission development planning, Policies/deployment programs Website http://www.worldwatch.org/node Country Guatemala Central America References Low-Carbon Energy for Central America: Building a Regional Model[1] Overview "This project will design a unified low-carbon development strategy for Central America through the use of renewable energy and energy efficiency maps, followed by technical, economic, and social feasibility studies for

388

Overview of CFC replacement issues for household refrigeration  

Science Conference Proceedings (OSTI)

In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth's temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

Vineyard, E.A. (Oak Ridge National Lab., TN (United States)); Roke, L. (Fisher and Paykel, Auckland (New Zealand)); Hallett, F. (Frigidaire, Washington, DC (United States))

1991-01-01T23:59:59.000Z

389

A Centrifugal Contactor Design to Facilitate Remote Replacement  

SciTech Connect

Advanced designs of nuclear fuel recycling and radioactive waste treatment plants are expected to include more ambitious goals for solvent extraction based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. This work continues the development of remote designs for ACCs that can process the large throughputs needed for future nuclear fuel recycling and radioactive waste treatment plants. A three stage, 12.5 cm diameter rotor module has been constructed and is being evaluated for use in highly radioactive environments. This prototype assembly employs three standard CINC V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance. Removal and replacement of the center position V-05R contactor in the three stage assembly was demonstrated using an overhead rail mounted PaR manipulator. Initial evaluation indicates a viable new design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment. Replacement of a single stage via remote manipulators and tools is estimated to take about 30 minutes, perhaps fast enough to support a contactor change without loss of process equilibrium. The design presented in this work is scalable to commercial ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute.

David H. Meikrantz; Jack. D. Law; Troy G. Garn; Lawrence L. Macaluso

2011-03-01T23:59:59.000Z

390

Overview of CFC replacement issues for household refrigeration  

Science Conference Proceedings (OSTI)

In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth`s temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

Vineyard, E.A. [Oak Ridge National Lab., TN (United States); Roke, L. [Fisher and Paykel, Auckland (New Zealand); Hallett, F. [Frigidaire, Washington, DC (United States)

1991-12-31T23:59:59.000Z

391

Replacing Hazelwood Power Station Critique of Environment Victoria report  

E-Print Network (OSTI)

Hazelwood Power Station is Australias most CO2 emission intensive power station. Replacing it with cleaner technology could reduce Australias CO2 emissions by 12 to 16 Mt/a. Energy Victoria recently commissioned a report by Green Energy Markets Pty Ltd to consider options. But the report has a pro-renewables bias, avoids the best option (gas only), and contains many inconsistencies. Comparing the renewables and gas option against the gas only option shows Emissions saved per year: 12.2 Mt/a versus 11.8 Mt/a; Capital cost: $6-$7 billion versus $2 billion;

Peter Lang

2010-01-01T23:59:59.000Z

392

Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project  

Science Conference Proceedings (OSTI)

CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-04T23:59:59.000Z

393

CMS System Security Plan Template  

Science Conference Proceedings (OSTI)

System Security Plan (SSP) Template Instructions. This template contains boiler plate language. Each template must be ...

2009-06-30T23:59:59.000Z

394

Environmental Implementation Plan  

SciTech Connect

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

1994-02-01T23:59:59.000Z

395

Draft Transportation Institutional Plan  

SciTech Connect

The Department of Energy recognizes that the success of its program to develop and implement a national system for nuclear waste management and disposal depends on broad-based public understanding and acceptance. While each program element has its particular sensitivity, the transportation of the waste may potentially affect the greatest number of people, and accordingly is highly visible and potentially issue-laden. Therefore, the Office of Civilian Radioactive Waste Management has developed this Transportation Institutional Plan to lay the foundation for interaction among all interested parties for the purpose of identifying and resolving issues of concern. The Plan is divided into four chapters. Chapter 1 provides bachground information and discusses the purpose of the Plan and the policy guidance for establishing the transportation system. Chapter 2 introduces the major participants who must interact to build both the system itself and the consensus philosophy that is essential for effective operations. Chapter 3 suggests mechanisms for interaction that will ensure wide participation in program planning and implementation. And, finally, Chapter 4 suggests a framework for managing and resolving the issues related to development and operation of the transportation system. A list of acronyms and a glossary are included for the reader's convenience. The Plan's appendices provide supporting material to assist the reader in understanding the roles of the involved institutions. 4 figs., 1 tab.

1985-09-01T23:59:59.000Z

396

Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites  

SciTech Connect

This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

Richman, Eric E.

2012-10-31T23:59:59.000Z

397

Environmental Restoration Quality Program Plan  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

398

Mexico-IAEA Energy Planning | Open Energy Information  

Open Energy Info (EERE)

IAEA Energy Planning IAEA Energy Planning Jump to: navigation, search Name IAEA-Mexico Cooperation Agency/Company /Organization International Atomic Energy Agency Sector Energy Topics Background analysis Website http://www-tc.iaea.org/tcweb/p Program Start 2009 Country Mexico Central America References IAEA Project database - Mexico[1] IAEA is working with Mexico to Support Medium and Long Term Planning for the Expansion of Electricity Generation Capacity. References ↑ "IAEA Project database - Mexico" Retrieved from "http://en.openei.org/w/index.php?title=Mexico-IAEA_Energy_Planning&oldid=328964" Category: Programs What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

399

High Risk Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Risk Plan Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are an Issue * With respect to reductions in high risk contracting strategies, the M&O contracts was also a challenge since the opportunity to further influence competition and contract type was highly constrained. The Department had already competed approximately 85 percent of its M&O

400

Standard Review Plan Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Framework for EM Projects Critical Decision (CD) Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission-critical projects/facilities. Coupled with this ongoing mission is the added responsibility for EM to diligently leverage and apply American Recovery and Reinvestment Act (ARRA) funds to accelerate the completion of its

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

IT Capital Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Carol Blackston, Director (Acting) IM Organization Structure (as of 1/13/2014) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) Russell Pereira (Acting) Associate CIO for Technology Evaluation and Chief Technology Officer (IM-50) Peter Tseronis Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services Steve Cox (Acting)

402

Human Capital Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Plan Bea Dukes Melissa Rider AHCP Issues  Decentralization of Contracting Process within DOE  In spite of MA and CFO guidance, the actual (FTE) growth of Acquisition Workforce depends on Program Office and/or site level management Recap of this year's planning process  Thanks for your efforts on the development and consolidation of this year's AHCP  Collaborative effort with most HCA level activities  A few glitches ◦ OMB Template very confusing and required much clarification ◦ Many changes throughout the process  Thanks for your patience ◦ Lesson Learned: SPE, CFO, HC and Program Offices must be in synchronization Fallout  Additional funding called out in FY11 -

403

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

404

Report: Strategic Planning Impacts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Planning Impacts Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM complex will also help to lower overall lifecycle costs, create jobs, and allow the program to capitalize on its past successes. Implementation of ARRA is a high-visibility endeavor that has the potential to impact the EM base program's day-to-day operations and processes.

405

IT Capital Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Peter Lenentine, Director IM Organization Structure (as of 12/19/2013) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) TheAnne Gordon Technology Evaluation Office (IM-50) Peter Tseronis, Director (Acting) Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services John Berthiaume (Acting) Human Capital and Administrative

406

Customer Service Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

407

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

408

INL Executable Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

ID-11383 ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 (This Page Intentionally Left Blank) DOE/ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 Prepared for the U.S. Department of Energy DOE Idaho Operations Office (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report DOE/ID-11383 Revision 2 December 2010 Approved By: ~~~/ Jeffrey~USseau Fa~ 7 Dlte President and General Manager , - Bechtel BWXT Idaho, LLC Advanced Mixed Waste Treatment Project (This Page Intentionally Left Blank)

409

DOE CONTRACTOR PENSION PLANS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

410

Energy Organizational Planning  

SciTech Connect

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

411

Solid-State Lighting: LED Replacement Lamps: Current Performance and the  

NLE Websites -- All DOE Office Websites (Extended Search)

LED Replacement Lamps: Current LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® to someone by E-mail Share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Facebook Tweet about Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Twitter Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Google Bookmark Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Delicious Rank Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on Digg Find More places to share Solid-State Lighting: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® on

412

DOE-HDBK-1129-2007: Tritium Handling and Safe Storage; Replaced...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HDBK-1129-2007: Tritium Handling and Safe Storage; Replaced by DOE-HDBK-1129-2008 DOE-HDBK-1129-2007: Tritium Handling and Safe Storage; Replaced by DOE-HDBK-1129-2008 Tritium...

413

Lipid Analysis and Lipidomics: New Techniques & ApplicationChapter 17 Fat Replacers: An Overview  

Science Conference Proceedings (OSTI)

Lipid Analysis and Lipidomics: New Techniques & Application Chapter 17 Fat Replacers: An Overview Methods and Analyses eChapters Methods - Analyses Books Downloadable pdf of Chapter 17 Fat Replacers: An Overview from

414

Income Replacement and Reemployment Programs in Michigan and Neighboring States  

E-Print Network (OSTI)

Governments in every developed industrial economy administer programs that partially replace the earnings of workers who suffer job loss or on-the-job injury. In addition, governments administer programs to help job losers gain reemployment, either through direct job placement (for those who are job-ready) or through retraining (for those who are not). This chapter describes and discusses current policy issues surrounding the main social insurance and reemployment programs in Michigan: Unemployment Insurance (UI), which partially replaces lost earnings following loss of a job; Workers ' Compensation (WC), which pays for medical treatment, vocational rehabilitation, and lost earnings following a work-related injury or illness; and the cluster of reemployment and training programs that, since 1998, has come under the Workforce Investment Act (WIA). In addition to describing these programs, a main goal of the chapter is to offer a critical view of Michigan's programs by comparing them with corresponding programs in neighboring states. Discussion of these three programs could hardly be more timely. UI has come under attack for a range of alleged failings, and the Michigan legislature passed a bill in April 2002 that increased weekly benefits, lengthened benefit durations, and tightened the eligibility requirements

Stephen A. Woodbury; Stephen A. Woodbury

2002-01-01T23:59:59.000Z

415

Fuel gas main replacement at Acme Steel's coke plant  

SciTech Connect

ACME Steel's Chicago coke plant consists of two 4-meter, 50-oven Wilputte underjet coke-oven batteries. These batteries were constructed in 1956--1957. The use of blast furnace gas was discontinued in the late 1960's. In 1977--1978, the oven walls in both batteries were reconstructed. Reconstruction of the underfire system was limited to rebuilding the coke-oven gas reversing cocks and meter in orifices. By the early 1980's, the 24-in. diameter underfire fuel gas mains of both batteries developed leaks at the Dresser expansion joints. These leaks were a result of pipe loss due to corrosion. Leaks also developed along the bottoms and sides of both mains. A method is described that permitted pushing temperatures to be maintained during replacement of underfire fuel gas mains. Each of Acme's two, 50-oven, 4-metric Wilputte coke-oven, gas-fired batteries were heated by converting 10-in. diameter decarbonizing air mains into temporary fuel gas mains. Replacement was made one battery at a time, with the temporary 10-in. mains in service for five to eight weeks.

Trevino, O. (Acme Steel Co., Chicago, IL (United States). Chicago Coke Plant)

1994-09-01T23:59:59.000Z

416

Water Management Planning: A Case Study at Blue Grass Army Depot  

Science Conference Proceedings (OSTI)

Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guidance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Management Practices (BMPs). The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky. In accordance with this plan, BGAD must: Incorporate the plan as a component of the Installation energy conservation plan Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs Put into practice all applicable O&M options Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.

Solana, Amy E.; McMordie-Stoughton, Katherine L.

2006-04-03T23:59:59.000Z

417

EMSL Strategic Plan 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

7753 7753 EMSL Strategic Plan 2008 AA Campbell August 2008 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Environmental Molecular Sciences Laboratory Strategic Plan Our Mission EMSL, a U.S. Department of Energy national scientific user facility located at Pacific Northwest National Laboratory, provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular

418

PICs Implementation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

419

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

420

Permanent Markers Implementation Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental protection implementation plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

422

Guam Strategic Energy Plan  

SciTech Connect

Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

Conrad, M. D.

2013-07-01T23:59:59.000Z

423

Thermal Stabilization Blend Plan  

SciTech Connect

The Blend Plan was written to identify items stored outside of the 213 MBA that will be moved into the MBA for thermal stabilization processing. Product quality oxide items stored in our vaults are found in Appendix A. A table is included in Appendix A which details the isotopic values for the oxide items and calculates the amount of material of any specific run that can be placed in a product can and maintain the 15 watt limit to meet storage vault specifications. This Revision of the Blend Plan adds items of lesser dose rate to lower the exposure of the workers until additional shielding can be added to the gloveboxes.

RISENMAY, H.R.

2000-04-20T23:59:59.000Z

424

Performance Management Plan  

SciTech Connect

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

425

Plutonium Vulnerability Management Plan  

Science Conference Proceedings (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

426

Alaska Strategic Energy Plan and Planning Handbook | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a step-by-step process that Alaska Native villages and communities may wish to use as a roadmap for discussion and decisions related to strategic energy planning and energy project prioritization Includes blank text boxes for communities to input their own

427

Demonstration Assessment of Light-Emitting Diode (LED) Post-Top Lighting at Central Park in New York City  

SciTech Connect

A review of five post-top light-emitting diode (LED) pedestrian luminaires installed in New York City's Central Park for possible replacement to the existing metal halide post-top luminaire. This report reviews the energy savings potential and lighting delivered by the LED post-top luminaires.

Myer, Michael; Goettel, Russell T.; Kinzey, Bruce R.

2012-09-30T23:59:59.000Z

428

Functions and Requirements and Specifications for Replacement of the Computer Automated Surveillance System (CASS)  

SciTech Connect

Functional requirements and specifications document for system to replace tank farm computer automated waste tank surveillance system.

DOUKA, K.C.

2000-05-05T23:59:59.000Z

429

Guideline for the Seismic Technical Evaluation of Replacement Items for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This guideline provides practical, cost-effective techniques for reasonably assuring that replacement items will meet seismic performance requirements. Meeting such requirements is necessary to maintain the seismic design basis of commercial nuclear power plants. The guideline also offers a method for determining when a seismic technical evaluation of replacement items is required as part of the procurement process for spare and replacement items.

1993-06-01T23:59:59.000Z

430

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA  

E-Print Network (OSTI)

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

431

CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY  

SciTech Connect

THE CENTRAL PLATEAU REMEDIATION OPTIMIZATION STUDY WAS CONDUCTED TO DEVELOP AN OPTIMAL SEQUENCE OF REMEDIATION ACTIVITIES IMPLEMENTING THE CERCLA DECISION ON THE CENTRAL PLATEAU. THE STUDY DEFINES A SEQUENCE OF ACTIVITIES THAT RESULT IN AN EFFECTIVE USE OF RESOURCES FROM A STRATEGIC PERSPECTIVE WHEN CONSIDERING EQUIPMENT PROCUREMENT AND STAGING, WORKFORCE MOBILIZATION/DEMOBILIZATION, WORKFORCE LEVELING, WORKFORCE SKILL-MIX, AND OTHER REMEDIATION/DISPOSITION PROJECT EXECUTION PARAMETERS.

BERGMAN TB; STEFANSKI LD; SEELEY PN; ZINSLI LC; CUSACK LJ

2012-09-19T23:59:59.000Z

432

Intermountain Province Subbasin Plan  

E-Print Network (OSTI)

Intermountain Province Subbasin Plan EXECUTIVE SUMMARY Spokane, Washington GEI Consultants, Inc. The Intermountain Province (IMP) is located in the northeast corner of Washington State and the northern Idaho Oreille and Spokane subbasins are in Washington and Idaho. The remaining subbasins are within Washington

433

Multispecies Conservation Planning  

E-Print Network (OSTI)

CHAPTER 3 Multispecies Conservation Planning on U.S. Federal Lands Barry R. Noon, Kevin S. McKelvey, and Brett G. Dickson Numerous laws directly, or indirectly, mandate the conservation of all species that govern the use of these same lands that are in conflict with a goal of maximizing the conservation

434

Aerocapacitor commercialization plan  

DOE Green Energy (OSTI)

The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

NONE

1995-09-12T23:59:59.000Z

435

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

436

Introduction to Transportation Planning  

E-Print Network (OSTI)

Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 on a Saturday night, transportation is not an objective in and of itself, but a means to carry out the functions of daily living (i.e., it's a "derived good"). As a consequence, the transportation systems we build

Tipple, Brett

437

ACNW - 1998 strategic plan  

SciTech Connect

This plan provides strategic direction to The Advisory Committee on Nuclear Waste (ACNW) in 1998 and beyond for focusing on issues most important to the NRC in carrying out its mission of protecting public health and safety, promoting the common defense and security, and protecting the environment.

1998-04-01T23:59:59.000Z

438

PNNL Campus Master Plan  

SciTech Connect

The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

Mosey, Whitney LC

2012-09-07T23:59:59.000Z

439

Hoechst plans Mexican unit  

SciTech Connect

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

440

Strategic Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Performance Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance Plans Performance Plans Performance Plans December 13, 2013 Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FY 2014-15 Annual Performance Plan December 18, 2012 Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013 and 2014 planned activities. November 28, 2011 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities.

442

Workforce Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy and Guidance » Human Capital Management » Workforce Plans Policy and Guidance » Human Capital Management » Workforce Plans Workforce Plans Workforce Planning is an integral part of the human capital planning process. The intent of every workforce planning effort is to ensure that organizations have the resources necessary to meet mission requirements and program priorities. To achieve this intent, organizations must first identify and understand those mission requirements and program priorities; typically through Strategic Planning. These goals and objectives not only provide the basis for determining necessary financial resources, but they also provide the basis for determining workforce needs. For assistance with creating or modifying your workforce plans please see our Guide to Workforce Planning Documents Available for Download

443

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF  

SciTech Connect

The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

Krementz, D.; Coughlin, Jeffrey

2009-05-05T23:59:59.000Z

444

EPRI Case History Study: High Pressure Feedwater Heater Replacement  

Science Conference Proceedings (OSTI)

U.S. utilities are faced with the need for continuous change in the way plants are operated and maintained. A focus on generation costs sets the stage for innovation in the way fossil plant outages are planned and managed. While nuclear plants have been pioneers in this area, fossil plant managers and support staff are now recognizing ways to extend runs between outages and minimize outage duration. This is being accomplished with aggressive application of condition-based maintenance, and improved outage...

2005-12-16T23:59:59.000Z

445

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

446

Natural Resource Management Plan for Brookhaven National Laboratory  

SciTech Connect

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).

green, T.

2011-08-15T23:59:59.000Z

447

Deterministic planning in the fifth international planning competition: PDDL3 and experimental evaluation of the planners  

Science Conference Proceedings (OSTI)

The international planning competition (IPC) is an important driver for planning research. The general goals of the IPC include pushing the state of the art in planning technology by posing new scientific challenges, encouraging direct comparison of ... Keywords: Automated planning, Benchmarks for planning, Experimental evaluation of planning systems, International planning competition, Knowledge representation in planning, PDDL, Plan constraints, Planning languages, Planning systems, Preferences in planning

Alfonso E. Gerevini; Patrik Haslum; Derek Long; Alessandro Saetti; Yannis Dimopoulos

2009-04-01T23:59:59.000Z

448

Strategic Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Plans Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more by reading strategic planning reports for specific research areas. Standing Technical Committees The Building America program actively engages all relevant industry stakeholders in the research planning process, primarily through Standing Technical Committees (STCs). STCs focus on identifying and resolving key

449

COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements  

NLE Websites -- All DOE Office Websites (Extended Search)

March 20, 2013, 4:15pm to 6:30pm March 20, 2013, 4:15pm to 6:30pm Colloquia MBG Auditorium COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements with Fungi Mr. Gavin McIntyre Ecovative Design LLC Colloquium Committee: The Princeton Plasma Physics Laboratory 2013-2014 Colloquium Committee is comprised of the following people. Please feel free to contact them by e-mail regarding any possible speakers or topics for future colloquia. Carol Ann Austin caustin@pppl.gov John Greenwald, Chair jgreenwa@pppl.gov Charles H. Skinner cskinner@pppl.gov Daren Stotler dstotler@pppl.gov Carol Ann Austin 609-243-2484 Contact Information Coordinator(s): Ms. Carol Ann Austin caustin@pppl.gov Host(s): Ms. Kelsey Tresemer ktreseme@pppl.gov PPPL Entrance Procedures Visitor Information, Directions, Security at PPPL

450

Fermilab Master Plan Fermilab Master Plan Overview Presentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Master Plan Master Plan Fermilab Master Plan Overview Presentation Mission Support Organization Planning Winter Workshop Feb 20, 2013 Thursday, February 21, 13 Fermilab Master Plan Integrating the new vision for the Intensity Frontier facilities and other Science with a sound strategy for infrastructure and support facility development Thursday, February 21, 13 Fermilab Master Plan In order to help define and best use all laboratory resources to most effec5vely and efficiently meet Fermilab's Plan for Discovery, the laboratory is developing a Fermilab Campus Master Plan (FCMP) for the next 20 years. The document will guide the development of modern, produc5ve, and efficient laboratory facili5es that will enable the laboratory to fulfill its mission of advancing

451

Planning support systems for spatial planning through social learning  

E-Print Network (OSTI)

This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

Goodspeed, Robert (Robert Charles)

2013-01-01T23:59:59.000Z

452

Proper centralizers can improve horizontal well cementing  

SciTech Connect

The selection and spacing of appropriate centralizers can improve the cementation of high-angle and horizontal wells. Mud removal is one of the most important factors in obtaining a good cement job. Effective centralization assists in mud removal and helps ensure an even cement coat around the casing. Centralizers for horizontal wells have to fulfill two requirements: They should have a high restoring capability and a low moving force, and they should allow pipe rotation and reciprocation. Conventional bow-type centralizers have been used successfully in some horizontal wells. But as the horizontal section length increases, special centralizers, such as low-moving-force, bow-type centralizers and rigid centralizers, may be necessary. The paper describes the following: cementing liners, centralization, torque and drag, centralizer placement, the bow-type centralizer, the rigid centralizer, and the downhole activated centralizer.

Kinzel, H. (Weatherford Oil Tool, Langenhagen (Germany))

1993-09-20T23:59:59.000Z

453

Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace  

NLE Websites -- All DOE Office Websites (Extended Search)

4: October 17, 4: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel to someone by E-mail Share Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Facebook Tweet about Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Twitter Bookmark Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Google Bookmark Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Delicious Rank Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on Digg Find More places to share Vehicle Technologies Office: Fact #394: October 17, 2005 Fuel to Replace Gasoline and Diesel Fuel on AddThis.com...

454

Central Hudson Gas & Electric (Electric) - Commercial Lighting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Savings Central Hudson Gas & Electric (Electric) - Commercial Lighting Rebate Program Central Hudson Gas & Electric (Electric) - Commercial Lighting Rebate...

455

Central LF Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

| Sign Up Search Page Edit with form History Facebook icon Twitter icon Central LF Biomass Facility Jump to: navigation, search Name Central LF Biomass Facility Facility...

456

Central Eolica Rosada Ltda | Open Energy Information  

Open Energy Info (EERE)

navigation, search Name Central Eolica Rosada Ltda Place Mossoro, Rio Grande do Norte, Brazil Sector Wind energy Product Brazil based wind project developer. References Central...

457

Central Indiana Ethanol LLC | Open Energy Information  

Open Energy Info (EERE)

Central Indiana Ethanol LLC Jump to: navigation, search Name Central Indiana Ethanol LLC Place Marion, Indiana Zip 46952 Product Ethanol producer developina a 151 mlpa plant in...

458

Central Air conditioners | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Central Air conditioners Jump to: navigation, search TODO: Add description List of Central Air conditioners Incentives Retrieved...

459

2011-2020 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a quick idea of how this plan has evolved, we'll start by observing that the job of a strategic plan is not to suggest that we keep on doing the same thing as before; it is,...

460

LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK April 2004 PUBLICATION.....................................................................................................................2 SECTION II: HOW TO PREPARE THE PLAN Step 1: Designate an Energy Emergency Coordinator.......................................................................................................12 SECTION III: EXAMPLES OF OPERATING GUIDELINES Energy Emergency Coordinator

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Rail Planning Timeline  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Timeline: By Responsible Party Planning Timeline: By Responsible Party Rev. 4.0, November 2006 Timeframe Offeror/Agent FRA Railroad(s) Other Post Shipment * DOE conducts Lessons Learned Review. During Shipment(s) * The offeror (shipper) will ensure that the appropriate FRA point of contact is notified of any changes 1 in the transportation schedule upon confirmation of the change (modification of SCOP OI-4). * DOE will notify the state Governors or designees and designated tribal points of contact by telephone in the event of schedule changes greater than six hours (DOE Manual 8.2.1). * In the event of a substantial unanticipated delay en route (e.g., greater than 2 hours), the affected states and tribes will be notified of the event by TRANSCOM. 2 TRANSCOM will notify the affected states and tribes

462

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

463

ESnet Planning, Status,  

NLE Websites -- All DOE Office Websites (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

464

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

465

Individual Development Plan (IDP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Individual Development Plan (IDP) Individual Development Plan (IDP) SAMPLE 10/01/2012 to 09/30/2013 Training Reason Developmental Activity Description Training Cost Travel Cost Total Cost Hours Start Date/ Completion Date Short Range Goal 1: Enhance Leadership Skills Development Mentoring Receive mentoring from a higher grade employee (s) and provide mentoring to lower grade employee(s). 0 0 0 TBD 1/1/2013 Development Instructor led EM Leadership Excellence Program - Interpersonal Communication Skills 0 0 0 8 6/15/2013 Development Instructor led Federal Executive Institute (OPM): Leadership for a Democratic Society $18,300 0 0 30 day residential TBD Development Shadowing Shadow one or more SES employees for one or two day period to learn leadership techniques. 0 0 0 TBD TBD

466

Plan Your Arrival  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Your Arrival Plan Your Arrival Special arrangements and training are required for your first visit. When you complete your APS orientation, you will be issued an APS badge. With this badge you may enter the site at any time. Notify User Office When you know which beamline you'll be using and the date of your beam time, contact the User Office. We will check the status of your request for access and schedule any required orientation and training (630-252-9090, apsuser@aps.anl.gov). If you will arrive outside of normal business hours, you must notify the User Office in advance so we can arrange for gate access. Make Travel Arrangements When the User Office has notified you that you have been approved for access and your training has been scheduled, you may make your travel

467

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

468

Proj. Plan Example SEM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Plan Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart to include known resources. b. Section(s): 3.6 & 3.7 Page Number(s): 3-8 through 3-10 Summary of Change(s): Modified Resource Loading Chart to reflect current estimates. Modified Project/Deliverable Schedule to reflect current status of project. c. Section(s): Page Number(s): Summary of Change(s):

469

Community Relations Plan Update  

Office of Legacy Management (LM)

8-TAR 8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this document, please call (800) 269-7145 (Utah only) or Monticello Repository Office Complex (435) 587-4000 DOE Grand Junction Office Community Relations Plan Update FY 2001 Page v Table of Contents Terms and Abbreviations........................................................................................................... vii

470

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

471

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

472

RHIC STATUS AND PLANS.  

Science Conference Proceedings (OSTI)

RHIC ended successfully its second year of operation in January 2002 after a six month run with gold ions and two months of polarized proton collisions. I will review the machine performance and accomplishments, that include reaching design energy (100 GeV/u) and design luminosity during the gold run, and the first high energy (100 GeV) polarized proton collisions. I will also discuss the machine development strategy and the main performance milestones. The goals and plans for the shutdown and the nest run, scheduled to start in November 2002 have been the focus of a RHIC Retreat in March 2002. I will summarize findings and plans for the upcoming run and outline a vision for the nest few years of RHIC operation and upgrades.

PILAT,R.

2002-06-02T23:59:59.000Z

473

CIPS Validation Data Plan  

SciTech Connect

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

Nam Dinh

2012-03-01T23:59:59.000Z

474

Computers aid drilling planning  

Science Conference Proceedings (OSTI)

This article reports that computers are rapidly becoming an indispensable tool for the drilling engineer both in town and at the wellsite. Two factors have contributed to the sudden increase in their use. The first is the need to cut drilling costs. Engineers have been forced to take a more critical look at plans and past experience. The second is the falling price (and increased portability) of hardware and software. Several major operators have demonstrated that careful planning of drilling operations based on local knowledge and data from offset wells can reduce the drilling learning curve substantially. Computers make it possible to retrieve and process offset well data rapidly and efficiently. They also offer powerful mathematical models which describe complicated aspects of drilling.

Burgess, T.

1986-11-01T23:59:59.000Z

475

Hanford Emergency Response Plan  

SciTech Connect

The Hanford Emergency Response Plan for the US Department of Energy (DOE), Richland Operations Office (RL), incorporates into one document an overview of the emergency management program for the Hanford Site. The program has been developed in accordance with DOE orders, and state and federal regulations to protect worker and public health and safety and the environment in the event of an emergency at or affecting the Hanford Site. This plan provides a description of how the Hanford Site will implement the provisions of DOE 5500 series and other applicable Orders in terms of overall policies and concept of operations. It should be used as the basis, along with DOE Orders, for the development of specific contractor and RL implementing procedures.

Wagoner, J.D.

1994-04-01T23:59:59.000Z

476

CIPS Validation Data Plan  

SciTech Connect

This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

Nam Dinh

2012-03-01T23:59:59.000Z

477

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

478

SunShot Initiative: Advanced Nitrate Salt Central Receiver Power Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Nitrate Salt Central Receiver Power Plant Advanced Nitrate Salt Central Receiver Power Plant Abengoa logo Photo of two lit towers surrounded by much smaller blue flat plates that are mounted on the ground. Commercial central receiver plant designs Abengoa, under the Baseload CSP FOA, will demonstrate a 100-megawatt electrical (MWe) central receiver plant using nitrate salt as the receiver coolant, thermal storage medium, and heat transport fluid in the steam generator. Approach The plan is to operate the plant at full load for 6,400 hours each year using only solar energy. Abengoa is working to create a team of suppliers capable of deploying a commercially ready nitrate salt central receiver technology that can be competitive in the current power marketplace. Innovation Abengoa is developing a new molten-salt power tower technology with a surround heliostat field. Key components include:

479

National Infrastructure Protection Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrastructure Infrastructure Protection Plan 2006 Preface Preface i The ability to protect the critical infrastructure and key resources (CI/KR) of the United States is vital to our national security, public health and safety, economic vitality, and way of life. U.S. policy focuses on the importance of enhancing CI/KR protection to ensure that essential governmental missions, public services, and economic functions are maintained in the event of a

480

Pretreatment Technology Plan  

SciTech Connect

This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "replaces centrally planned" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Chemical Hygiene and Safety Plan  

E-Print Network (OSTI)

Safety Plan m Chemical$torase Guidelines Chemical Is Incompatible llll i With ii Hydrocarbons (such as butane, propane,

Ricks Editor, R.

2009-01-01T23:59:59.000Z

482

The NABIR Strategic Plan 2001  

E-Print Network (OSTI)

Strategic Plan has greatly benefited from input from many individuals including the staff of BER and the DOE

Various

2001-01-01T23:59:59.000Z

483

Sheraton Seattle Hotel Floor Plans  

Science Conference Proceedings (OSTI)

139th Annual Meeting & Exhibition. Sheraton Seattle Hotel Floor Plans. MEETING ROOMS. RESTROOMS. LEVEL 1. LEVEL. MEETING INFORMATION.

484

Waste Management Quality Assurance Plan  

E-Print Network (OSTI)

PROGRAM .4 Organizational Structure ..4 Management Quality Assurance Functions 5 Planning 5 2.0 PERSONNEL TRAINING AND

Waste Management Group

2006-01-01T23:59:59.000Z

485

Climate Action Plan (Manitoba, Canada)  

Energy.gov (U.S. Department of Energy (DOE))

Manitoba's Climate Action Plan centers around energy efficiency, although it includes mandates and initiatives for renewable sources of energy.

486

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

487

Project Management Plan  

SciTech Connect

The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

Not Available

1988-01-01T23:59:59.000Z

488

Mobile systems capability plan  

Science Conference Proceedings (OSTI)

This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

NONE

1996-09-01T23:59:59.000Z

489

Energy Management and Conservation Plan  

E-Print Network (OSTI)

Energy Management and Conservation Plan December 2005 #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan Page 2 of 24 Table of Contents Section One: Executive: Reporting Progress #12;Texas Transportation Institute December 2005 Energy Management and Conservation Plan

490

Fuzzy model in urban planning  

Science Conference Proceedings (OSTI)

This paper presents application of a fuzzy logic in urban planning. Urban environment quality evaluation is an important part of environmental planning and management. Traditional theory does not give as good evaluation as the fuzzy set theory, which ... Keywords: GIS, fuzzy logic, urban evaluation, urban planning

Jasna Pleho; Zikrija Avdagic

2008-05-01T23:59:59.000Z

491

Libraries and Cultural Business Plan  

E-Print Network (OSTI)

Results Adequacy Gap 2007CARL Aggregate AdequacyGap 2010Target Adequacy Gap 2013Target Adequacy Gap and graduate students with financial support to cover Open Access author fees. #12;Business Plan 2009-2013Libraries and Cultural Resources 2009-2013 Business Plan #12;Business Plan 2009-2013 ­ Libraries

Habib, Ayman

492